1 00:00:08,110 --> 00:00:31,590 Seven o'clock, I am going to go ahead and call the meeting to order. Let's do roll call, please. Commissioner Brown. Here. Commissioner Crescenson. Here. Commissioner Bonsocka. Here. Commissioner Jordan. Commissioner Lawrence. Commissioner Swin. Commissioner Thompson. Here. Commissioner Wolk. Okay, let's stand for the pledge of allegiance. 2 00:00:46,410 --> 00:00:46,890 All 3 00:00:48,970 --> 00:00:56,390 right. The first item is to approve the agenda for tonight. I don't believe there's any modifications. So can I get a motion to approve the agenda? 4 00:00:56,390 --> 00:01:02,310 I have one modification on page 5, my mistake. 5 00:01:02,870 --> 00:01:04,770 The motion to approve the agenda. 6 00:01:05,110 --> 00:01:06,570 We'll move to approve the agenda. 7 00:01:07,590 --> 00:01:12,090 All right, motion by Wolf, second by Lorenz, all those in favor say aye. 8 00:01:13,190 --> 00:01:13,670 Opposed? 9 00:01:14,070 --> 00:01:14,950 That motion carries. 10 00:01:15,610 --> 00:01:16,550 Next on the minutes. 11 00:01:17,050 --> 00:01:19,270 Are there any changes to the minutes this week? 12 00:01:19,870 --> 00:01:21,430 One modification, Madam Chair. 13 00:01:22,110 --> 00:01:22,390 Go ahead. 14 00:01:22,390 --> 00:01:28,610 Okay. Page 5, the third full paragraph down where it says Wolf asked when construction is planned to begin. 15 00:01:28,610 --> 00:01:34,690 I believe that should be Jordan asked when construction is planned to begin, and then with that change, I'll move to approve the minutes. 16 00:01:36,470 --> 00:01:37,650 Any other changes? 17 00:01:40,300 --> 00:01:41,660 Okay, we have a motion by Wolf. 18 00:01:44,120 --> 00:01:44,340 Second. 19 00:01:44,540 --> 00:01:45,500 Second by Brown. 20 00:01:45,820 --> 00:01:46,960 All those in favor say aye. 21 00:01:47,280 --> 00:01:47,540 Aye. 22 00:01:48,420 --> 00:01:48,820 Opposed? 23 00:01:49,320 --> 00:01:50,440 That motion carries. 24 00:01:51,800 --> 00:01:54,320 There are no public hearings on the agenda tonight. 25 00:01:54,320 --> 00:02:02,380 There is a one application in request, a review for Final Platt for Big Sky Third Edition, 26 00:02:03,260 --> 00:02:12,540 which is a single, or a 35-lot single-family development to be located at 1.57th Street in Aquila Avenue Project 21-62. 27 00:02:14,200 --> 00:02:17,000 Thank you, Chair Craigs and good evening members of the commission. 28 00:02:17,500 --> 00:02:23,380 As stated, the item before you is a Final Platt request for Big Sky State's third edition. 29 00:02:26,360 --> 00:02:30,180 The property is approximately 74.8 acres in size. 30 00:02:30,840 --> 00:02:33,700 It is surrounded by low density residential to the north. 31 00:02:34,420 --> 00:02:36,920 Previous phases of the big sky development 32 00:02:36,920 --> 00:02:38,220 to the east and southeast, 33 00:02:38,400 --> 00:02:39,760 in addition to an elementary school, 34 00:02:39,900 --> 00:02:40,660 a little further east, 35 00:02:41,160 --> 00:02:43,900 and remaining mining area to the west. 36 00:02:44,620 --> 00:02:47,980 And that mine is run by or owned by prior Lake Agregates Inc, 37 00:02:48,160 --> 00:02:50,920 who is the property owner at this time 38 00:02:50,920 --> 00:02:52,560 and subject to the application as well. 39 00:02:53,460 --> 00:02:55,000 And on the other side of County Road 44, 40 00:02:55,000 --> 00:02:57,240 before we have City of Credit River property. 41 00:02:58,200 --> 00:03:01,140 The property is zoned to plan residential development today, 42 00:03:01,240 --> 00:03:02,560 and they are not proposing any changes 43 00:03:02,560 --> 00:03:04,360 to the zoning district with this request. 44 00:03:07,190 --> 00:03:09,550 So as stated, this is a final plat request. 45 00:03:10,350 --> 00:03:14,010 It is from an applicant, but they have a Keyland Development LLC, 46 00:03:14,290 --> 00:03:16,690 and we do have representatives in the audience this evening 47 00:03:16,690 --> 00:03:18,330 if you have questions for them later on. 48 00:03:18,990 --> 00:03:23,770 They are proposing to plat 35 single family lots and two outlots. 49 00:03:24,110 --> 00:03:26,470 And again, the zoning is planned residential development 50 00:03:26,470 --> 00:03:33,910 with no changes. And this group saw the preliminary PUD amendment back in January and it went 51 00:03:33,910 --> 00:03:39,090 to the Council in February. So now they're asking to go through the final process for, again, 52 00:03:39,290 --> 00:03:40,630 the same 35 lots. 53 00:03:44,760 --> 00:03:49,160 So lots in this third edition are consistent with the previously approved phases, 54 00:03:49,420 --> 00:03:57,020 1 and 2 related to size and setbacks. The setbacks for this development again would include 25 feet 55 00:03:57,020 --> 00:04:02,720 in the front and rear and side corner lots and seven and a half feet on each side yard. 56 00:04:03,440 --> 00:04:09,560 So on your screen right now is one of the two proposed grading plan pages and the box 57 00:04:09,560 --> 00:04:15,700 that you can kind of see within the lot area there is considered the building pad which 58 00:04:15,700 --> 00:04:19,320 would comply with those setbacks that we just discussed for each of those lots. 59 00:04:20,140 --> 00:04:23,960 It does not indicate that the house needs to be that large, however that would be the 60 00:04:23,960 --> 00:04:29,020 the building pad if someone wanted to pursue those minimum setback requirements. 61 00:04:31,480 --> 00:04:37,820 As shown on the grading plan, this particular addition will include an extension of the 62 00:04:37,820 --> 00:04:44,040 existing 157th Street right along here going northwest, as well as a temporary cul-de-sac 63 00:04:45,160 --> 00:04:47,340 to accommodate again the third addition. 64 00:04:47,800 --> 00:04:52,140 It is not known at this time if this will be extended in the future for another phase. 65 00:04:52,140 --> 00:04:57,200 So, at this time, staff is asking for, again, temporary construction of that cul-de-sac 66 00:04:57,200 --> 00:05:01,660 and at such time that that is extended, the easements and things would be vacated, 67 00:05:01,740 --> 00:05:03,180 and the road would be continued on. 68 00:05:04,560 --> 00:05:09,240 On the second page of the grading plan, which is addressing the kind of 69 00:05:09,240 --> 00:05:14,260 southeast portion of this project, it shows an extension of existing Aquila Avenue here, 70 00:05:14,760 --> 00:05:18,340 all the way down to the south with, again, another temporary cul-de-sac, 71 00:05:19,480 --> 00:05:24,740 which will be held within an easement document until further development of the property occurs. 72 00:05:28,850 --> 00:05:36,630 The existing 156th street that's kind of cut off here between the two plans that currently runs 73 00:05:36,630 --> 00:05:42,610 like so, kind of on the north side of the second edition currently stops right about here. 74 00:05:42,830 --> 00:05:47,110 So it will be extended just a little bit further and it will be considered a T kind 75 00:05:47,110 --> 00:05:51,810 of intersection for the time being, until such time for the development occurs to the west. 76 00:05:52,410 --> 00:05:56,990 So I do have a signage and lighting plan that we can look at in a few slides, but again, 77 00:05:57,130 --> 00:05:59,270 there will be a T intersection here temporarily. 78 00:06:00,110 --> 00:06:05,250 This road has been identified as a collector street moving forward, so we typically would 79 00:06:05,250 --> 00:06:09,510 not have driveway accesses and things of that nature off of a collector street. 80 00:06:10,010 --> 00:06:14,430 So again, this particular addition continues that concept, meaning the lots that are adjacent 81 00:06:14,430 --> 00:06:17,410 into it would be serviced by 157th Street. 82 00:06:20,620 --> 00:06:27,800 Also, on this page you can see that there is an extension right here on the north side of 157th Street 83 00:06:27,800 --> 00:06:32,300 to extend the existing Batuminous Trail that currently stops right about. 84 00:06:32,560 --> 00:06:39,200 So where my cursor is in the first edition, that is proposed to be extended up until 156th Street intersection 85 00:06:39,200 --> 00:06:43,880 and engineering is comfortable with that trail stopping at that point. 86 00:06:44,380 --> 00:06:50,720 but we would also still have sidewalk connections that continue on the entire length up to that temporary cul-de-sac. 87 00:06:57,490 --> 00:07:03,130 As you can see on this plan, there is no park identified and there was not a park identified during the preliminary phases. 88 00:07:03,710 --> 00:07:11,330 And as we discussed that length at the preliminary PUD amendment phase, the applicant as well as the property owner is aware, 89 00:07:11,810 --> 00:07:17,310 that prior to the submittal of a fourth edition request, they need to submit a revised sketch plan 90 00:07:17,310 --> 00:07:31,870 to show us an updated concept for where they anticipate the future phases as well as future road conditions or to be road connections, trail connections as well as an approximate 8 to 10 acre park as identified in our parks plan. 91 00:07:32,450 --> 00:07:44,150 So again, we're accepting park fees in lieu of actual land dedication with this particular item and we will have more information as future phases come in regarding the placement of those sorts of amenities. 92 00:07:44,150 --> 00:07:45,370 Again, 93 00:07:47,620 --> 00:07:50,900 here was the second page of the grading plan showing the kind of the southeast side 94 00:07:50,900 --> 00:07:52,420 in the extension of Aquila Avenue. 95 00:07:54,400 --> 00:07:59,440 The next slide shows a landscape plan that was required to be submitted by the applicant, 96 00:08:00,120 --> 00:08:06,040 particularly due to not only the required minimum two landscape trees for each lot, which 97 00:08:06,040 --> 00:08:13,980 they are showing here, but also to help identify and calculate the SS-9 trees, which we did talk 98 00:08:13,980 --> 00:08:20,240 again at the preliminary stage. So there were significant trees of a mesic oak species 99 00:08:20,240 --> 00:08:25,360 that were removed a number of years ago with the original, excuse me, initial development 100 00:08:25,360 --> 00:08:29,580 of this property. Therefore, the property owner and subsequent developers have agreed 101 00:08:29,580 --> 00:08:35,700 to replace mitigation trees as they do their phases. So the landscape plan before you, 102 00:08:35,780 --> 00:08:42,360 and again, due to the configuration, it is over two pages here, does show both the required 103 00:08:42,360 --> 00:08:45,740 land scape trees, two per lot, and the mitigation trees. 104 00:08:46,160 --> 00:08:51,300 So they are meeting the staff's mitigation requirements for this phase, and staff 105 00:08:51,300 --> 00:08:55,520 anticipates additional mitigation trees would be necessary in future phases until 106 00:08:55,520 --> 00:08:57,080 they satisfy the required amount. 107 00:08:59,530 --> 00:09:01,110 And so here's page two. 108 00:09:01,670 --> 00:09:06,610 So essentially what they're proposing to do with this particular landscape plan, they 109 00:09:06,610 --> 00:09:12,650 have proposed a total of 80 mitigation trees and 70 landscape trees, which again 110 00:09:12,650 --> 00:09:17,510 the landscape requirement is two trees per lot. The landscape requirement does not satisfy 111 00:09:17,510 --> 00:09:22,250 the mitigation requirement, which is why they have a total of 150 trees going in this third 112 00:09:22,850 --> 00:09:23,430 third edition. 113 00:09:29,010 --> 00:09:32,530 The plan on the screen right now also shows the signage and lighting plan, 114 00:09:32,530 --> 00:09:37,610 which we did discuss when it was last before this group. I'll be the colors are a little bit hard 115 00:09:37,610 --> 00:09:45,090 to see. They are proposing multiple stop signs here at the T intersection, which, again, is temporary 116 00:09:45,090 --> 00:09:46,890 until that road punches through. 117 00:09:47,270 --> 00:09:53,790 They've got three stop signs shown in kind of the red octagon, and then they have three stop, excuse me, 118 00:09:54,050 --> 00:10:00,330 three street lights, one kind of in the middle of block four, one on the corner here of the street intersection, 119 00:10:00,470 --> 00:10:04,850 and then another one down here, near the end of the Aquila Avenue street extension, 120 00:10:05,010 --> 00:10:08,330 which I believe was at the request of the commission back in January. 121 00:10:09,170 --> 00:10:11,770 So their plan does meet those items that were discussed. 122 00:10:16,040 --> 00:10:21,220 This last slide, albeit a little blurry, my apologies, actually shows what the big sky 123 00:10:21,220 --> 00:10:24,160 estate's third edition final flat document would look like. 124 00:10:24,740 --> 00:10:29,040 This would be the document that I actually would create those 35 lots and would be 125 00:10:29,040 --> 00:10:32,940 recorded at the county along with the development agreement and any other necessary 126 00:10:32,940 --> 00:10:36,400 easements that would be required as part of this project. 127 00:10:41,360 --> 00:10:45,480 At this time, the development review committee is recommending approval, subject to the 128 00:10:45,480 --> 00:10:47,300 conditions that were included in your packet. 129 00:10:47,300 --> 00:10:53,080 The list on the screen is not list everything, but just wanted to summarize some of the larger 130 00:10:53,080 --> 00:10:58,320 items. Staff is requiring compliance with our review comment letters, which is a standard 131 00:10:58,320 --> 00:11:05,740 requirement. Staff is confident that the applicant will be able to meet the items within the letters 132 00:11:06,060 --> 00:11:11,940 from both the city staff as well as the prior Lake Spring Lake Watershed District. A couple 133 00:11:11,940 --> 00:11:17,680 All of the larger items that are in that comment letter relate to conservation easements that 134 00:11:17,680 --> 00:11:20,980 are being required to cover the steep slopes. 135 00:11:21,140 --> 00:11:27,000 I'm just going to go back here to the grading plan to accommodate and protect the steep slopes 136 00:11:27,000 --> 00:11:29,360 that are behind these lots here in block four. 137 00:11:30,040 --> 00:11:34,860 So city staff is requiring a conservation easement and the applicant is agreeable to executing 138 00:11:34,860 --> 00:11:40,980 that agreement to preserve those slopes, as well as a separate agreement for maintenance 139 00:11:40,980 --> 00:11:55,380 maintenance by the homeowners for the proposed retaining wall that covers lots 2 through 5 here in the back, as well as conservation easements with the prior lake spring lake watershed district to protect the wetland and wetland buffer areas here. 140 00:11:56,460 --> 00:12:09,340 This wetland is actually part of big sky second addition, but the buffer requirement may encroach slightly on a couple of the lots, particularly lot 8 and 9 and the applicant is aware of this and is comfortable 141 00:12:09,340 --> 00:12:13,900 affordable with executing those easements to protect those areas as staff is requiring. 142 00:12:14,200 --> 00:12:16,020 So I'm confident we'll be able to meet those conditions. 143 00:12:20,540 --> 00:12:28,820 The other recommendations, again, is a pretty standard needing to execute all the required easements like we just talked about related to conservation easements. 144 00:12:29,200 --> 00:12:33,600 The temporary turnarounds for 157th and Aquila Avenue. 145 00:12:34,340 --> 00:12:40,360 The nice part about those particular easements is they're being drafted in a fashion so that when future development occurs, 146 00:12:40,360 --> 00:12:45,960 They will go away, if you will, so we don't necessarily have to come back and vacate them. 147 00:12:46,240 --> 00:12:51,120 So we've used that tool in the past and it seems to work well, as well as any easement 148 00:12:51,120 --> 00:12:54,560 for the prior lake spring lake watershed district is requiring for those wetlands. 149 00:12:55,220 --> 00:12:57,960 We touched on setbacks already and those were included in the report. 150 00:12:58,760 --> 00:13:03,820 The impervious surface is also a requirement for staff and staff in the applicant have discussed 151 00:13:03,820 --> 00:13:09,480 Plus that, and are comfortable with a 38% maximum for each lot in the third edition. 152 00:13:10,360 --> 00:13:15,700 And we also are keeping the same architectural standards that were required as part of phase one and phase two. 153 00:13:15,960 --> 00:13:18,200 So that would be consistent here again in phase three. 154 00:13:18,820 --> 00:13:23,500 And lastly, that we touched on was the requirement for a revised sketch plan. 155 00:13:23,620 --> 00:13:28,420 Be submitted prior to any future additions within the big sky development. 156 00:13:32,840 --> 00:13:43,040 The last slide is just, again, an overview of what the title sheet, if you will, kind of showing the proposed 35 lots as well as the building paths and anticipated driveway locations. 157 00:13:43,780 --> 00:13:46,640 We do have a rod just here representing Keyland. 158 00:13:46,780 --> 00:13:50,880 If you have any questions for the applicant, otherwise I'm happy to take any questions you might have. 159 00:13:52,100 --> 00:13:56,200 Okay, thank you, commissioners, go ahead. 160 00:13:56,200 --> 00:14:19,740 Madam Chair, Amanda, the tree mitigation plan will this follow what occurred in the first edition where the trees went in right afterwards before any houses were constructed and most of them either died or were destroyed during housing construction or will these go in after the houses are built? 161 00:14:20,480 --> 00:14:25,200 Commissioner Thompson, planning commission members, that's certainly something that we can work with the applicant on. 162 00:14:25,820 --> 00:14:30,700 Part of that might depend on the time of year in which they are actually doing the home building. 163 00:14:30,980 --> 00:14:37,920 It's my understanding that they're looking to continue to move forward and work on that as soon as possible once approvals are given so that would be yet in this year. 164 00:14:38,660 --> 00:14:45,580 But certainly I can let the applicant speak to maybe if something happened in a previous phase so that we don't repeat that moving forward. 165 00:14:49,130 --> 00:14:54,110 And if you'd like the applicant to come up, now we certainly can, other ways we can take other questions. 166 00:14:55,090 --> 00:14:59,970 I mean, in the first phase there was a mixed build of multiple builders, but when everything was 167 00:15:00,000 --> 00:15:28,780 All the trees were flooded and the streets were finished. All the trees went in. So the trees were all in before any houses went out. And of course, and trees died and trees were removed in order to put houses in or they were destroyed or they died in the interim. So the mitigation plan didn't actually go to plan. Commissioner Thompson just in hearing you explain a little bit more. I do not know exactly what the requirements were for the first edition as far as placement of those trees. 168 00:15:28,780 --> 00:15:44,640 But the applicant and staff have had conversations regarding those trees that are required for the two trees per lot landscape trees need to actually be planted on the lot, not within the right of way, if you will, or the boulevard area. 169 00:15:44,860 --> 00:15:52,720 So that may alleviate some of the issues that may have happened in previous phases where the trees were actually planted in the boulevard. 170 00:15:52,720 --> 00:16:19,340 But prior to building permits being issued, and then you had an issue where potentially they were in the way or the placement of those trees was not accommodating to construction equipment, actually trying to access those sites on that same note, those two landscape trees then typically are not put in until after the sod and at that phase of the home building, and we do require an escrow to make sure that those trees do get installed and they are warranted for a period of one year. 171 00:16:19,340 --> 00:16:28,940 So, I'm hoping that with those trees being placed on the individual properties as the homes are built, that will alleviate maybe some of the challenges that happened in the earlier phase. 172 00:16:29,220 --> 00:16:35,160 I'm actually referring to the mitigation trees that were placed ahead of time. The landscape trees weren't the issue. 173 00:16:35,160 --> 00:16:40,280 It was the mitigation trees that were placed. Also, those have either been destroyed or died off. 174 00:16:41,800 --> 00:16:47,720 Sure, so noted, as if you look at the plan, a lot of the green circles, or the shapes 175 00:16:47,720 --> 00:16:52,420 you can see, those are the proposed locations for those mitigation trees, and a lot of them 176 00:16:52,420 --> 00:16:55,400 are in the rear yards or beyond. 177 00:16:56,040 --> 00:16:59,580 So hopefully that won't be the case, but certainly something that we can make sure that the applicant 178 00:17:00,200 --> 00:17:05,760 is aware of, so that those mitigation trees do, in fact, survive those build periods, if 179 00:17:05,760 --> 00:17:05,960 you will. 180 00:17:06,660 --> 00:17:07,100 Okay. 181 00:17:07,680 --> 00:17:08,020 Thank you. 182 00:17:08,840 --> 00:17:23,320 Maybe to expand on that, and this might be a question for the applicant, but as far as those mitigation trees go, typically with a normal landscape plan, the homeowner would be watering their tree every day. 183 00:17:23,640 --> 00:17:34,500 So with these mitigation trees that look like they're put out away from the typical lots potentially or away from where the homes would be, how does that get handled? 184 00:17:34,500 --> 00:17:38,040 And how do you make sure that they try to stay alive once they are planted? 185 00:17:39,970 --> 00:17:41,970 I will defer to the applicant for that question. 186 00:17:42,270 --> 00:17:42,510 Okay. 187 00:17:43,690 --> 00:17:44,290 Would you like to do that? 188 00:17:44,290 --> 00:17:45,990 Let's have the applicant come up now, sure. 189 00:17:52,260 --> 00:17:55,020 I'm not just, I'm with key land, homes, key land development. 190 00:17:57,300 --> 00:18:01,040 In the first phase, we encountered some of the same problems that you're talking about. 191 00:18:01,120 --> 00:18:04,220 Trees were put in early, they weren't necessarily put in at the right elevations. 192 00:18:04,780 --> 00:18:07,200 Not putting the greatest of locations. 193 00:18:08,440 --> 00:18:10,920 And then we just all kind of had to deal with it. 194 00:18:11,040 --> 00:18:14,200 We're planning on putting these in as the houses are going in and after. 195 00:18:14,920 --> 00:18:17,460 So then we will have a homeowner there to water those trees. 196 00:18:18,380 --> 00:18:23,580 Once they're in, you put them in beforehand, you know, you've got to kind of keep your fingers crossed. 197 00:18:23,660 --> 00:18:27,000 You can water them occasionally, but it's just easier if you have somebody there. 198 00:18:27,680 --> 00:18:31,460 So they will be warranted for the first year, which is what you get from most three people. 199 00:18:31,460 --> 00:18:37,720 So we did locate them away from the houses, towards the rear yards. 200 00:18:38,220 --> 00:18:41,360 We were required to keep them out of the drainage and utility easements. 201 00:18:41,860 --> 00:18:46,340 So we think we have them laid out pretty well where they shouldn't be a problem for anybody. 202 00:18:46,520 --> 00:18:48,280 And we'll be a nice amenity in the neighborhood. 203 00:18:49,920 --> 00:18:50,460 Okay. 204 00:18:50,740 --> 00:18:51,120 Thank you. 205 00:18:51,540 --> 00:18:51,620 Yep. 206 00:18:54,180 --> 00:18:55,340 Commissioner's other questions? 207 00:18:59,180 --> 00:18:59,660 Madam Chair. 208 00:19:00,140 --> 00:19:00,420 Go ahead. 209 00:19:01,740 --> 00:19:06,060 Amanda, did the applicant meet all the conditions from the preliminary approval? 210 00:19:07,220 --> 00:19:09,180 Yes, Commissioner Wolfe, thank you for mentioning that. 211 00:19:09,280 --> 00:19:11,680 I should have included that in part of my presentation. 212 00:19:12,020 --> 00:19:15,400 Yes, they have met all of the requirements of the preliminary approval. 213 00:19:16,020 --> 00:19:20,320 There are still some comments as shown in the review comment letter that still need to be 214 00:19:20,320 --> 00:19:24,500 addressed, but they were all for the best of my knowledge incorporated and the applicant 215 00:19:24,500 --> 00:19:27,860 is aware and against that is confident that they'll be able to meet those requirements. 216 00:19:28,780 --> 00:19:32,800 And all other applicable regulations, if they may all those as well. 217 00:19:33,320 --> 00:19:34,180 The best of my knowledge, yes. 218 00:19:34,180 --> 00:19:34,300 Yes. 219 00:19:34,500 --> 00:19:34,720 Okay. 220 00:19:34,860 --> 00:19:35,120 Thank you. 221 00:19:39,660 --> 00:19:40,800 Any other questions? 222 00:19:45,560 --> 00:19:46,300 Seeing none. 223 00:19:46,640 --> 00:19:47,580 I'd entertain a motion. 224 00:19:47,920 --> 00:19:49,200 If somebody would like to make one. 225 00:19:49,980 --> 00:19:50,500 Madam Chair. 226 00:19:50,820 --> 00:19:51,100 Go ahead. 227 00:19:51,600 --> 00:20:01,840 I would move to recommend approval of the final plat for Big Sky State's third edition contingent on the development view committee conditions, as noted in the staff report. 228 00:20:02,380 --> 00:20:02,600 Second. 229 00:20:03,220 --> 00:20:03,660 All right. 230 00:20:03,920 --> 00:20:06,420 We have a motion by Wolf and a second by Christensen. 231 00:20:06,840 --> 00:20:08,400 All those in favor say aye. 232 00:20:08,720 --> 00:20:09,040 Aye. 233 00:20:09,720 --> 00:20:10,260 Opposed? 234 00:20:10,760 --> 00:20:17,060 That motion carries. And I believe that will go to the City Council meeting then on April 4th. 235 00:20:18,060 --> 00:20:18,980 Correct, Chair Craigs. 236 00:20:19,240 --> 00:20:19,580 All right. 237 00:20:22,240 --> 00:20:26,540 The next, I am staff reports. Are there any staff reports tonight? 238 00:20:27,400 --> 00:20:34,080 I was just going to give an update. So the Minnesota MASH application that you had seen at your last meeting, that actually it got delayed. 239 00:20:34,100 --> 00:20:41,660 The developer asked that to be put on hold just he wanted some additional time to review the developer's agreement so that also will go to the City Council meeting on April 4th. 240 00:20:41,660 --> 00:20:48,760 And then the way it's looking right now, I don't believe we'll have any agenda items for the April 7th. 241 00:20:48,760 --> 00:20:50,300 All right. 242 00:20:52,750 --> 00:20:56,390 Any old business? How about new business? 243 00:20:59,220 --> 00:21:00,140 Meetings adjourned.