1 00:00:42,930 --> 00:00:48,790 May everyone here tonight to the special meeting for August 10th for the Plan of Commission. 2 00:00:50,490 --> 00:00:53,930 And at this time, I'm going to ask Ms. Kirby if she will please to call the roll. 3 00:00:55,170 --> 00:01:03,310 Ms. Iverson, Mr. McGee, Mr. Abbott, Mr. Haydra, Mr. Ledbetter, Mr. Whitaker, Chairman Bailey. 4 00:01:08,390 --> 00:01:13,970 If you did not get a copy of tonight's agenda, there should be some at the back of the auditorium. 5 00:01:13,970 --> 00:01:22,590 If you want to pick those up to follow along, at this time on my ask everyone to stay in it and I'll ask Mr. Abbott, if he will, the leaders in the pledge of allegiance. 6 00:01:50,300 --> 00:01:56,500 Before we get into our schedule hearings for tonight, 7 00:01:57,060 --> 00:02:04,600 We do all our citizens in opportunity to speak to the Commission on any item that is not 8 00:02:04,600 --> 00:02:09,900 on tonight's agenda, if you want to make comments on anything that is on tonight's agenda. 9 00:02:10,420 --> 00:02:14,600 We do ask that you wait until we're discussing that case before you make those comments. 10 00:02:15,780 --> 00:02:19,300 So at this time, I'm going to open up citizens' time. 11 00:02:19,980 --> 00:02:24,200 Anyone who wants to speak and come forward, I've got one card here from Mr. Terry. 12 00:02:24,980 --> 00:02:27,580 If he wants to come forward, see 13 00:02:30,840 --> 00:02:31,840 in the auditorium, 14 00:02:35,400 --> 00:02:37,040 you can pardon me. 15 00:02:40,960 --> 00:02:43,120 You can come fly, I'm so I couldn't understand. 16 00:02:44,560 --> 00:02:47,100 Oh, if it's only a gender, no, just wait, I'm sorry. 17 00:02:47,720 --> 00:02:48,060 I'm sorry. 18 00:02:48,540 --> 00:02:51,920 Anyone who wants to speak or want anything that's not only a gender for tonight? 19 00:02:53,620 --> 00:02:58,720 If not, I'm going to close Susan's time, and we're going to move on into our cases for tonight. 20 00:02:59,680 --> 00:03:08,820 We have one case tonight that the Commission will be taking action on, and then we have 21 00:03:08,820 --> 00:03:12,980 two other cases that we're going to have for informational purposes. 22 00:03:13,780 --> 00:03:17,400 One would be the conference to plan up date and the other is the solar policy. 23 00:03:18,420 --> 00:03:23,460 We will allow some citizens to come in on that, but the official vote on that will not 24 00:03:23,460 --> 00:03:27,380 be until our regular meeting, which would be next Thursday, to 17. 25 00:03:28,040 --> 00:03:33,860 So, having said that the one case that we do have, that we're going to have action on tonight. 26 00:03:34,580 --> 00:03:37,640 I'll turn it over to Mr. Pompeii if you would please for the presentation. 27 00:03:38,060 --> 00:03:38,960 Thank you, Mr. Bailey. 28 00:03:39,760 --> 00:03:47,520 So, the first public hearing for tonight is a specific case related to an amendment to the current 2018 Comprehensive Plan. 29 00:03:48,540 --> 00:03:53,520 The Hanover County Board of Supervisors has submitted a request to amend the Comprehensive Plan 30 00:03:53,520 --> 00:03:59,320 at a new school complex in eastern Hanover along the U.S. Route 360 corridor. This particular 31 00:03:59,320 --> 00:04:04,980 proposal would locate the schools within the Henry district. Here is a map of the properties 32 00:04:04,980 --> 00:04:09,000 that the county's under contract to purchase where the proposed schools will be located, 33 00:04:09,100 --> 00:04:13,600 a proposed middle school, and a proposed high school to replace Bel Creek middle school in 34 00:04:13,600 --> 00:04:19,540 mechanicsville High. The properties stretch from U.S. Route 360 mechanics will turnpike north 35 00:04:19,540 --> 00:04:23,200 to pole green road at its intersection with Williamsville Road. 36 00:04:23,600 --> 00:04:27,180 This is just east, almost a mile east of Walnut Grove Road 37 00:04:27,180 --> 00:04:29,120 and the Route 360 intersection. 38 00:04:32,640 --> 00:04:34,160 The particular map was a zoning map 39 00:04:34,160 --> 00:04:35,460 and if this amendment is approved, 40 00:04:35,520 --> 00:04:37,540 this is what the conference of plan would look like. 41 00:04:37,940 --> 00:04:38,960 The community facilities plan 42 00:04:38,960 --> 00:04:40,800 in particular, the schools and libraries plan 43 00:04:40,800 --> 00:04:43,160 shows existing libraries and existing school. 44 00:04:43,760 --> 00:04:46,340 That map would be amended to show two proposed schools, 45 00:04:46,340 --> 00:04:48,980 again, between Route 360 and pole green road, 46 00:04:49,240 --> 00:04:50,960 near its intersection with Williamsville Road. 47 00:04:52,690 --> 00:05:01,090 So, for a little background, the school board and the Board of Supervisors are working together to locate a site for a replacement for Bel Creek middle school, 48 00:05:01,170 --> 00:05:06,570 and mechanics full high school, those schools are aging and are slated to be replaced in the coming decades. 49 00:05:07,330 --> 00:05:13,090 After some consideration, they chose the site, which is several parcels again, between Route 360 and Pol Green Road. 50 00:05:13,510 --> 00:05:19,490 This would be the first step in all of the necessary land use approvals that the county would need to obtain before those schools are constructed, 51 00:05:19,490 --> 00:05:22,630 even the county and the school board need to go through these different processes. 52 00:05:23,430 --> 00:05:26,990 So the first step is to show on the companies of plan where generally where these facilities 53 00:05:26,990 --> 00:05:31,930 would be located, all public facilities need to be located on the comprehensive plan maps. 54 00:05:32,970 --> 00:05:37,190 In eight to ten years, the school board is a anticipated to pursue a conditional use permit, 55 00:05:37,330 --> 00:05:41,170 the properties are a zone day one, so they would need to go through that conditional use permit. 56 00:05:41,450 --> 00:05:46,150 At that time, there would be detailed plans and studies and actual engineering drawing 57 00:05:46,150 --> 00:05:49,050 for the planning commission and the Board of Supervisors to review. 58 00:05:49,050 --> 00:05:50,730 But this time it's just a high level concept. 59 00:05:51,030 --> 00:05:53,310 Hey, is this the right location for these schools? 60 00:05:53,910 --> 00:05:55,510 Once the conditional use permits approved, 61 00:05:55,650 --> 00:05:58,450 if it is, the project would go through the site plan 62 00:05:58,450 --> 00:05:59,270 approval process. 63 00:05:59,790 --> 00:06:03,790 Again, this is just to help the county do its due diligence. 64 00:06:04,050 --> 00:06:05,750 Has it resues purchasing this land? 65 00:06:06,010 --> 00:06:07,690 The conditional use permit process would not 66 00:06:07,690 --> 00:06:09,290 have them for eight to ten years in the school 67 00:06:09,290 --> 00:06:10,670 constructed after that. 68 00:06:12,290 --> 00:06:13,970 This is a potential site layout. 69 00:06:14,050 --> 00:06:15,310 Again, this is a concept. 70 00:06:15,630 --> 00:06:17,230 Once the conditional use permit is applied, 71 00:06:17,330 --> 00:06:18,410 they'll be detailed drawings. 72 00:06:18,410 --> 00:06:22,750 In the shows, how two schools could fill in the property with associated athletic fields 73 00:06:22,750 --> 00:06:28,750 and then an access road, stretching from pole green road, where it intersects with Williamsville Road, down to U.S. Route 360. 74 00:06:31,920 --> 00:06:36,660 There are a couple key issues that the county is investigating as it pursues purchase of this property. 75 00:06:37,080 --> 00:06:43,480 Transportation is a major issue. Again, these schools would not have direct access onto the Route 360 or pole green road. 76 00:06:43,600 --> 00:06:47,920 There would be an access road with the school entrances off that internal access road. 77 00:06:47,920 --> 00:06:55,680 To better understand the impacts, these schools could have on the surrounding area, a traffic impact analysis is completed at this time. 78 00:06:55,960 --> 00:06:59,740 Once the condition leaves permits applied for there also have to update that traffic study. 79 00:07:00,180 --> 00:07:05,920 But at this time, based on traffic volumes currently and with projected, there are some recommended improvements at each of the site entrances, 80 00:07:06,820 --> 00:07:11,300 as well some improvements recommended at the intersection of U.S. Route 3, 16, 1 at Grove Road. 81 00:07:11,300 --> 00:07:16,980 The county is already planning for those intersection improvements at Walnut Grove Road in US Route 360. 82 00:07:17,560 --> 00:07:21,720 They're included in the 10-year funding plant, the Board of Supervisors adopted in July. 83 00:07:22,900 --> 00:07:28,660 Another important piece of this is that these schools will be located just east of the boundary of the suburban service area where 84 00:07:28,660 --> 00:07:30,840 growth is anticipated and utilities are provided. 85 00:07:31,420 --> 00:07:36,240 Public water and sewer would be extended to these schools from the SSA. 86 00:07:36,260 --> 00:07:38,400 They likely be extended down US Route 360. 87 00:07:38,400 --> 00:07:47,340 But since these properties are outside of the SSA, no other properties be allowed to connect to these water and sewer extensions that would only be designed to serve the school. 88 00:07:48,280 --> 00:07:51,580 Historic resources, a phase one field survey was conducted. 89 00:07:51,880 --> 00:07:57,600 There are a couple of battlefield features located on the property and a cemetery that's associated with one of the historic homes. 90 00:07:57,680 --> 00:07:59,660 That's located on the parcels as well. 91 00:08:00,240 --> 00:08:04,580 The historical commission did review this case and there will be potential impacts as part of this construction. 92 00:08:04,580 --> 00:08:12,240 They want to be involved as the conditional use permit and school design continues and as a phase two study is conducted since these 93 00:08:12,240 --> 00:08:22,200 Features were found in the phase one study a more detailed study will be conducted to help design the site and determine how to mitigate negative impacts to any historic resources on the site 94 00:08:23,940 --> 00:08:31,620 Environment there are some streams and upon they're located within a adjacent to the site along with adjacent RPA areas the site 95 00:08:31,620 --> 00:08:35,980 the ideal or conceptual layout does acknowledge those different features. 96 00:08:36,480 --> 00:08:39,140 And the most surrounding area is rural residential uses. 97 00:08:39,260 --> 00:08:41,180 Again, it's outside the suburban service area, 98 00:08:41,300 --> 00:08:44,440 where there is more of our higher intensity development. 99 00:08:45,140 --> 00:08:47,440 A church is adjacent to the property along Pol Green Road. 100 00:08:47,540 --> 00:08:50,700 There are a few limited commercial uses along US Route 360, 101 00:08:50,820 --> 00:08:53,960 but again, most of the area includes residential uses. 102 00:08:55,960 --> 00:08:58,100 Community meeting was held on June 21. 103 00:08:58,300 --> 00:09:01,220 Some of the issues and concerns that participants 104 00:09:01,220 --> 00:09:07,860 shared was concerned with traffic, noise, light pollution, environmental impacts, perimeter buffers, 105 00:09:08,020 --> 00:09:12,520 and impacts to historic resources. Again, some of these more detailed questions, concerns, 106 00:09:12,840 --> 00:09:17,360 will be fleshed out in further details, part of the conditional use permit as a site is designed. 107 00:09:17,820 --> 00:09:22,480 Right now, we're just to determine, hey, is this generally inappropriate site for the schools? 108 00:09:25,790 --> 00:09:30,190 Based on that feedback staff recommends approval this request, and we do have a public hearing 109 00:09:30,190 --> 00:09:32,610 I'd be happy to answer any questions the Commission hasn't. 110 00:09:33,590 --> 00:09:34,930 All right, thank you. 111 00:09:37,760 --> 00:09:42,660 Since the county is the actual applicant, I'm sure you don't have anything else to add 112 00:09:42,660 --> 00:09:43,700 other than your presentation. 113 00:09:44,300 --> 00:09:46,820 So I'm going to open the public hearing at this point. 114 00:09:47,160 --> 00:09:52,160 Is anyone here who would like to speak in favor of this case, would you please raise your hand? 115 00:09:54,330 --> 00:09:57,410 Anyone here who is in opposition to the case, raise your hand? 116 00:10:00,540 --> 00:10:00,800 Okay. 117 00:10:01,020 --> 00:10:03,040 Seeing none of them will close the public hearing. 118 00:10:05,220 --> 00:10:06,640 Was it one? 119 00:10:06,660 --> 00:10:08,360 Well, I'm sorry, thank you, pardon. 120 00:10:09,000 --> 00:10:09,740 I missed it. 121 00:10:09,860 --> 00:10:10,080 Yes, sir. 122 00:10:10,240 --> 00:10:10,880 You're an opposition? 123 00:10:12,980 --> 00:10:15,640 You're an opposition to the case or in favor of the case? 124 00:10:16,080 --> 00:10:16,320 Neither. 125 00:10:17,420 --> 00:10:19,540 I'm kind of like a middle ground, so to speak. 126 00:10:19,940 --> 00:10:19,980 All right. 127 00:10:19,980 --> 00:10:21,460 I just got some rough guy. 128 00:10:21,660 --> 00:10:22,200 Let's say it away. 129 00:10:22,620 --> 00:10:23,500 You get five minutes, sir. 130 00:10:23,820 --> 00:10:24,680 Yeah, no problem. 131 00:10:25,340 --> 00:10:26,300 My name's Doug Terry. 132 00:10:26,420 --> 00:10:31,980 I own land west of your school side, about 75 feet west of there. 133 00:10:31,980 --> 00:10:34,900 My concern is, you know, 134 00:10:34,900 --> 00:10:36,660 Roof in development, I understand all that, 135 00:10:36,880 --> 00:10:39,380 and traffic's going to be y'all's main biggest concern 136 00:10:39,380 --> 00:10:42,100 on this thing I believe, from the general public. 137 00:10:42,560 --> 00:10:45,080 But my whole thing is on his own, 138 00:10:47,060 --> 00:10:51,720 it's doing it the service area, expand in that, 139 00:10:51,820 --> 00:10:54,060 and lead frog and over the top of the existing properties 140 00:10:55,900 --> 00:10:58,980 between the school and the current service area. 141 00:10:59,800 --> 00:11:02,980 You're going to put a water and sewer down through there, 142 00:11:02,980 --> 00:11:09,020 nobody can hook to. And to me that's, you know, you're doing it for the community and for the 143 00:11:09,020 --> 00:11:15,220 area, for the whole, uh, bottom of the whole county, but you're limiting who can actually use 144 00:11:15,220 --> 00:11:21,300 that sewer and water in that area. Um, you know, your whole sponsor hands at playing talks 145 00:11:21,300 --> 00:11:28,640 about, you know, uh, harmonious, uh, expansion, and continuous expansion. And then when you leave 146 00:11:28,640 --> 00:11:36,900 like that, that's not continuous. It talks about, you know, allows for the expansion for schools 147 00:11:36,900 --> 00:11:42,940 and stuff like that, but it talks about expanding the service area, not jumping over much 148 00:11:42,940 --> 00:11:47,860 properties. So my whole thing is, make it continuous, make it something that people in the community 149 00:11:47,860 --> 00:11:53,940 can use on your warden sewer and, you know, beware of that approach. But like I said, you know, 150 00:11:53,940 --> 00:11:57,580 I'm not in favor, I'm not in favor of against this thing. 151 00:11:57,740 --> 00:11:59,480 I'm in favor of it, I guess, as I were to speak, 152 00:11:59,960 --> 00:12:01,600 but I was just like to see it done, 153 00:12:01,760 --> 00:12:04,640 you know, really smart planning. 154 00:12:05,400 --> 00:12:08,420 You know, smart planning, you get good results out of it. 155 00:12:08,620 --> 00:12:11,860 You know, just like to see that happen, you know, 156 00:12:11,920 --> 00:12:14,400 you guys can talk about it and go your way, 157 00:12:15,060 --> 00:12:17,180 but in the end, that's kind of like, 158 00:12:17,460 --> 00:12:19,260 yes, thank you very much. 159 00:12:19,440 --> 00:12:20,620 Thank you, Mr. Terry. 160 00:12:22,000 --> 00:12:23,040 Anyone else 161 00:12:26,300 --> 00:12:31,060 want to make any comments in opposition to the case or in favor of the case? 162 00:12:32,620 --> 00:12:33,440 I don't want to miss anyone. 163 00:12:36,700 --> 00:12:39,000 Okay, I'm going to go ahead and close the public hearing. 164 00:12:41,970 --> 00:12:45,430 Mr. Pompeo, you might want to address some of his concerns on the SSA. 165 00:12:46,130 --> 00:12:52,530 The only thing I can comment on is that, how do the Haskell is outside of the SSA as well? 166 00:12:53,470 --> 00:12:53,950 Am I correct? 167 00:12:53,950 --> 00:13:13,450 Hand of High School is actually just inside the SSA, the opposite side of the SSA, but Paul Green Elementary School is outside of the SSA, Patrick Henry High School is outside the SSA, and while both of those schools are outside of the SSA, they do have public utilities providing service to them. 168 00:13:13,450 --> 00:13:17,730 the same as this would. And I don't think there are any plans right now to include 169 00:13:18,410 --> 00:13:25,730 to expand the SSA, but I mean, the school, if the cup is going to be in eight to ten years, 170 00:13:25,850 --> 00:13:31,530 it could be 10 or 15 years before the school is built. And by then, I mean, I'm not saying that it 171 00:13:31,530 --> 00:13:36,770 would be, but it could be that the board at that time wants to include more into the SSA. It's 172 00:13:36,770 --> 00:13:42,390 just that they don't want to expand the SSA. Am I correcting that? That's correct, if it was 15 173 00:13:42,390 --> 00:13:47,130 years out say there'd be three updates to our Congress of Plampton and now. 174 00:13:47,770 --> 00:13:48,330 Okay. 175 00:13:50,390 --> 00:13:55,690 So, any other comments concerning the SSA that Mr. Terry is referring to? 176 00:13:55,730 --> 00:14:00,170 No other comments, but again, the board is indicated that it won't allow connections between 177 00:14:00,170 --> 00:14:04,050 the school and other properties that are outside the SSA. 178 00:14:04,490 --> 00:14:10,990 Okay, thank you. All right, the public hearing is closed. I'll just make a couple of comments. 179 00:14:12,970 --> 00:14:13,450 One, 180 00:14:16,760 --> 00:14:20,960 the mechanical high school right now is about 82% capacity. 181 00:14:21,540 --> 00:14:28,480 Real often, I think all of us will hear comments on the schools that are at 100%. 182 00:14:28,480 --> 00:14:31,920 I don't think there are any schools that handle the county at 100%. 183 00:14:32,600 --> 00:14:38,140 The high school is about 82% and middle school right now is at 81%. 184 00:14:38,140 --> 00:14:47,240 But the driving factor, I think, in the kind of being interested in the life of a new school is those schools are so old. 185 00:14:47,320 --> 00:14:56,480 Mechanical high schools built in 1959, and Battlefield, I'm sorry, Bill Creek, middle schools built in 1969. 186 00:14:57,520 --> 00:14:59,520 So you're talking about old structures. 187 00:15:00,270 --> 00:15:08,230 It's a lot of money to try to, you know, for maintenance and upkeep. And it's still 10 years out before this school would come into fruition. 188 00:15:09,090 --> 00:15:15,370 So the main driving factor, I think it's going to be, you know, the age of the schools that they have right now. 189 00:15:18,330 --> 00:15:28,810 This is just one step as Mr. Pompey indicated that the county has to get approval on when they sign the contract with the Bolshef family. 190 00:15:28,810 --> 00:15:34,770 And there are certain steps that the county has to meet in order to honor the contract. 191 00:15:34,950 --> 00:15:40,710 And one of those is they've got to know that that way and can be included in the comprehensive 192 00:15:40,710 --> 00:15:45,610 plan that we can include in a amendment to accommodate that. 193 00:15:47,190 --> 00:15:51,070 And there are many other factors that come into play in a lot of other hurdles, I guess, that 194 00:15:51,070 --> 00:15:56,650 the county is going to have to contend with over the next 10 or 15 years. 195 00:15:56,650 --> 00:16:02,070 So having said that this is in my district, I would 196 00:16:02,070 --> 00:16:05,810 like to recommend approval of the comprehensive amendment 197 00:16:05,810 --> 00:16:12,130 on CBA-2023-00002. 198 00:16:12,130 --> 00:16:15,370 I would recommend approval and be afforded onto the board of Sympathias. 199 00:16:16,710 --> 00:16:17,470 Do I have a second? 200 00:16:18,170 --> 00:16:18,690 Second. 201 00:16:18,890 --> 00:16:20,530 Second from Mr. Hager, any other discussion? 202 00:16:21,910 --> 00:16:23,070 All in favor say aye. 203 00:16:23,630 --> 00:16:26,710 All opposed nay. Okay, motion carries. 204 00:16:30,710 --> 00:16:34,090 Okay, we're going to move on to the 205 00:16:35,270 --> 00:16:37,130 Comprehensive plan update 206 00:16:38,630 --> 00:16:45,170 and take citizen comments at the end that as well as I think Mr. Pompey is going to do this. I think 207 00:16:46,310 --> 00:16:53,430 Miss Hunter's going to do the solar and energy policy. So Mr. Pompey is all yours on the comp update. 208 00:16:53,430 --> 00:17:03,870 Yes, sir, so I'll give an overview of what the conference of plan update process has been as well as some of the proposed planning concepts and changes, so I'll start with that presentation before we have the public hearing. 209 00:17:05,690 --> 00:17:12,190 So the comprehensive plan is the long range guide for growth development and the investment of public infrastructure here in Hanover County. 210 00:17:12,630 --> 00:17:20,530 Every county and locality in Virginia is required to have a comprehensive plan and the code of Virginia requires that that plan be reviewed and updated every five years. 211 00:17:20,530 --> 00:17:26,330 Our current plan was adopted in February of 2018, so we're reaching that five-year mark. 212 00:17:26,590 --> 00:17:30,090 We started the planning process two years ago, and for those of you that are curious, 213 00:17:30,230 --> 00:17:34,510 our first comprehensive plan was in 1972, and we've been pretty diligent about updating 214 00:17:34,510 --> 00:17:36,730 that all of those five-year increments. 215 00:17:37,310 --> 00:17:40,830 The plan is called comprehensive because it addressed a wide variety of topics, 216 00:17:41,110 --> 00:17:45,530 land use, economic development, history and culture, a variety of different issues that are 217 00:17:45,530 --> 00:17:49,490 all unrelated to how we grow, develop, and invest in public infrastructure in the county. 218 00:17:51,180 --> 00:17:54,720 We started this project in October of 2021. 219 00:17:55,460 --> 00:17:59,500 Public outreach started in January of 2022 as we launched the website 220 00:17:59,500 --> 00:18:01,560 and began holding public events. 221 00:18:02,120 --> 00:18:05,760 Motor's 2022 was oriented towards general visioning, 222 00:18:05,920 --> 00:18:07,620 working with the community to identify strengths, 223 00:18:08,080 --> 00:18:11,340 weaknesses, and what their long-term vision for growth and development is 224 00:18:11,340 --> 00:18:14,740 here in Handover County that also included in-person meetings, 225 00:18:15,080 --> 00:18:18,180 virtual meetings, as well as a combination of surveys. 226 00:18:18,880 --> 00:18:24,320 As we moved into 2023, we began taking a deeper dive into those topic areas I showed in the 227 00:18:24,320 --> 00:18:28,480 difference screen. We spent January and February looking at land use, economic development, 228 00:18:28,480 --> 00:18:33,700 history and culture. And then we moved on to the other topic areas through July. Based on the 229 00:18:33,700 --> 00:18:38,160 feedback that we heard, we've developed a draft document which you all received as part of your packet. 230 00:18:40,720 --> 00:18:46,260 One thing that was a major focus of this planning effort was to try to get the word out as much 231 00:18:46,260 --> 00:18:51,080 possible about what this planning process is and try to get as much feedback as we could from 232 00:18:51,080 --> 00:18:51,640 the community. 233 00:18:51,880 --> 00:18:57,640 There have been 20 in-person meetings, which many of y'all have attended, over 4,000 comments 234 00:18:57,640 --> 00:19:04,000 were received, about 700 people attended one of the webinars or in-person meetings. 235 00:19:04,340 --> 00:19:08,900 We had three to 400 people respond to the online surveys that we had, we had two of those. 236 00:19:09,200 --> 00:19:13,500 We tried to reach out to the community through different social media platforms as well as 237 00:19:13,500 --> 00:19:14,120 the website. 238 00:19:14,120 --> 00:19:20,260 We also sent letters to property owners that are impacted by proposed changes that are significant to the general land use plan. 239 00:19:20,440 --> 00:19:26,460 We place signs out. We got about 100 calls based on those signs. We posted a different location where changes were proposed. 240 00:19:27,120 --> 00:19:32,680 The Planning Commission, the Board of Supervisors, have been actively involved in this project through different workshops and quarterly updates. 241 00:19:33,320 --> 00:19:43,880 And one thing that was new that I don't think we've done in previous planning efforts is we went out to different festivals and fair strawberry festival to made a festival train day to try to get more people involved in the effort we might not be involved. 242 00:19:43,880 --> 00:19:45,680 in different Plainy processes otherwise. 243 00:19:48,760 --> 00:19:54,060 Again, here are some of the different stakeholders and groups that we held with those different 244 00:19:54,060 --> 00:19:54,680 topic areas. 245 00:19:54,680 --> 00:19:58,560 We really relied on the expertise of some of our existing commissions, so the historical commission 246 00:19:58,560 --> 00:20:02,300 met a few times required, feedback, the economic development authority met a few times 247 00:20:02,300 --> 00:20:03,160 required feedback. 248 00:20:03,540 --> 00:20:07,300 And this process was guided by the community participation team, which you all were a part of 249 00:20:07,300 --> 00:20:09,100 as long as well as with citizen members. 250 00:20:09,660 --> 00:20:12,760 So again, we try to get feedback in different ways and through different platforms. 251 00:20:14,700 --> 00:20:20,340 Based on this 4,000 comments, plus comments that we received over that 2 year period, we identified 252 00:20:20,340 --> 00:20:21,400 some key themes. 253 00:20:21,500 --> 00:20:24,720 As you can imagine, with 4,000 comments, you get 4,000 different ideas. 254 00:20:25,360 --> 00:20:27,960 But again, some key themes emerge along the way. 255 00:20:28,180 --> 00:20:31,460 One of the top things that we heard through this process is many people want to preserve 256 00:20:31,460 --> 00:20:35,360 the real character along with that managed growth to make sure it occurs in appropriate 257 00:20:35,360 --> 00:20:36,060 locations. 258 00:20:36,520 --> 00:20:40,060 And there's also interesting providing different housing options, whether that be people 259 00:20:40,060 --> 00:20:43,640 I'm interested in making sure their kids could come home to an affordable and quality housing 260 00:20:43,640 --> 00:20:47,160 product, or some people said as a age they want to be able to move to a low maintenance 261 00:20:47,160 --> 00:20:48,440 option in their community. 262 00:20:49,520 --> 00:20:53,160 Community infrastructure, maintaining and enhancing the transportation network, and that wasn't 263 00:20:53,160 --> 00:20:57,320 just comments about improving roads, but providing more infrastructure for pedestrian bicycle 264 00:20:57,320 --> 00:21:02,200 mobility, maintaining the quality of our schools, providing more parks, particularly in the 265 00:21:02,200 --> 00:21:05,140 server and service area, and expanding broadband access. 266 00:21:05,840 --> 00:21:09,360 And then many comments really delay in use in the quality of development and where different 267 00:21:09,360 --> 00:21:13,900 types of uses should occur, one of the key themes that came through this concept and through 268 00:21:13,900 --> 00:21:18,580 recent zoning cases that you all reviewed is providing transitions, not only transitions 269 00:21:18,580 --> 00:21:22,980 between different use types, how do you address that interface between say residential and 270 00:21:22,980 --> 00:21:27,260 industrial uses, how do you transition from the suburban service area, which are designated 271 00:21:27,260 --> 00:21:29,640 growth area to the rural parts of the county. 272 00:21:33,340 --> 00:21:35,420 Again, with 4,000 comments, you get 4,000 273 00:21:35,420 --> 00:21:40,540 different ideas and it's a really tough job for you all. The Board of Supervisors and staff 274 00:21:40,540 --> 00:21:44,740 to try to balance all those different ideas and all that feedback we're receiving. 275 00:21:45,200 --> 00:21:49,220 The goals to have a compromise that reflects the overall vision of the community and all 276 00:21:49,220 --> 00:21:53,260 those different feedback and interest groups that we hear from. 277 00:21:56,100 --> 00:22:00,700 In terms of major planning concepts, one overall concept that helped guide decision-making 278 00:22:00,700 --> 00:22:03,440 through this process was updating our population forecast. 279 00:22:04,040 --> 00:22:07,760 In previous plans, we used annual growth rate of 1.5%. 280 00:22:07,760 --> 00:22:13,940 As far as this planning effort, we anticipate or a potential outcome could be 1% growth annually. 281 00:22:14,220 --> 00:22:17,040 That's how fast we grew between 2010 and 2020. 282 00:22:17,920 --> 00:22:22,580 So looking forward, as you looked at land use needs and facilities needs, we assume that 1% 283 00:22:22,580 --> 00:22:27,280 growth rate, which is slower than we have anticipated as part of previous planning efforts. 284 00:22:28,740 --> 00:22:35,340 Land use and growth management, one of the key concepts that Hanover County is used to control growth since 1982, 285 00:22:35,340 --> 00:22:40,860 has been the suburban service area where utilities are provided and growth is directed. As far 286 00:22:40,860 --> 00:22:45,200 this planning effort, the Board of Supervisors indicate they want to maintain the boundaries 287 00:22:45,200 --> 00:22:49,720 of the suburban service area as is. That makes up 22 percent of the county, those boundaries 288 00:22:49,720 --> 00:22:54,000 will not change with remaining 78 percent of the county designated as rural and agricultural. 289 00:22:54,980 --> 00:22:59,420 One major concept that's new is part of this planning effort of actually some previous plans, 290 00:22:59,500 --> 00:23:04,060 but not the most current one was providing a suburban transitional residential designation 291 00:23:04,060 --> 00:23:09,000 Along the edge of the suburban service area where possible, that's up to one and a half units per acre, 292 00:23:09,260 --> 00:23:12,440 whereas much of the suburban service area is one and a half to three units an acre. 293 00:23:12,820 --> 00:23:17,080 Again, providing a transition from the suburban parts to the county to the areas that are intended to remain rural. 294 00:23:18,180 --> 00:23:23,400 Continue the target distribution of residential growth, 70% in the SSA, 30% in the rural areas. 295 00:23:23,940 --> 00:23:31,320 We updated some of the names and descriptions of land use designations, and we've read a little bit more detailed guidance on the design of different uses. 296 00:23:31,320 --> 00:23:36,520 So with a different land use designation, there is a recommended mix of uses, how we address 297 00:23:36,520 --> 00:23:41,960 transportation access, landscaping, and buffering, building quality, and then transitions 298 00:23:41,960 --> 00:23:43,120 between different use types. 299 00:23:45,720 --> 00:23:49,400 One major component of the conference of plan that relates to land use is the general land 300 00:23:49,400 --> 00:23:53,980 use plan that indicates where different types of uses may be appropriate and what areas of 301 00:23:53,980 --> 00:23:56,360 the county may be appropriate for growth moving forward. 302 00:23:56,800 --> 00:24:02,100 That plan was updated based on land use vision workshops we held in July and August of 303 00:24:02,100 --> 00:24:07,400 2022 feedback from different staff experts and different departments regarding infrastructure, 304 00:24:07,800 --> 00:24:09,360 capacity, and economic development. 305 00:24:09,780 --> 00:24:13,740 Lessons we heard from recent zoning cases in the public feedback we received through those 306 00:24:13,740 --> 00:24:18,440 cases and I'm mapping exercise that looked at what existing conditions are in the county. 307 00:24:19,580 --> 00:24:23,960 We're possible we try to make the links as nations follow a clear boundary so they weren't 308 00:24:23,960 --> 00:24:24,720 so ambiguous. 309 00:24:25,780 --> 00:24:27,840 That's not the case in all places but we could do that. 310 00:24:27,960 --> 00:24:29,100 We try to make those changes. 311 00:24:29,100 --> 00:24:37,560 And then all the detailed changes that were significant are detailed in the staff report as well as the public notice that was in the case of local. 312 00:24:40,620 --> 00:24:48,040 Some new designations are on the map. Again, that suburban transitional designation along the edges of the suburban service area inside the suburban service area. 313 00:24:48,680 --> 00:24:58,040 In the 2018 plan commercial is commercial. It doesn't matter what the type is to help address neighborhood compatibility and compatibility with adjacent areas. 314 00:24:58,040 --> 00:25:02,380 we divided that commercial classification up to the three different categories, highway commercial 315 00:25:02,380 --> 00:25:07,820 which would be something you might see on Route 3, 16 year, at 295, the more intense commercial. 316 00:25:08,500 --> 00:25:12,000 And then other areas we have that neighborhood commercial designation which is lower intensity 317 00:25:12,000 --> 00:25:16,740 commercial that might be adjacent to residential uses. And then rural crossroads, these are historic 318 00:25:16,740 --> 00:25:20,900 communities where there might have been a store or something like that. Those are found in our rural areas, 319 00:25:21,140 --> 00:25:26,040 provide services to those living in the more rural parts of the county. A new designation, 320 00:25:26,040 --> 00:25:28,300 And I was also at his parks and conserved lands. 321 00:25:28,660 --> 00:25:32,740 That shows county owned parks, nationally owned battlefield parks, 322 00:25:33,080 --> 00:25:34,780 properties on our own conservation easement. 323 00:25:35,100 --> 00:25:37,580 It shows properties where there's already some sort of voluntary 324 00:25:38,500 --> 00:25:41,740 or ownership situation where those properties 325 00:25:41,740 --> 00:25:42,740 will never be developed. 326 00:25:45,410 --> 00:25:49,130 History and culture, the main change in addition 327 00:25:49,130 --> 00:25:51,690 in this particular chapter was adding specific guidance 328 00:25:51,690 --> 00:25:54,090 on how we address development when it occurs 329 00:25:54,090 --> 00:25:55,610 in our national register districts. 330 00:25:55,610 --> 00:25:57,710 we have three of those, Brown Grove, rural historic, 331 00:25:58,030 --> 00:25:59,910 district, Canaver County Courthouse, and Montpelier. 332 00:26:00,490 --> 00:26:05,510 There's also more guidance on how different historic features could be addressed 333 00:26:05,510 --> 00:26:06,330 as development occur. 334 00:26:06,570 --> 00:26:09,330 So, for example, there's a development site that has battlefield features. 335 00:26:09,590 --> 00:26:12,450 There's certain guidance on how development can occur on that property, 336 00:26:12,590 --> 00:26:15,090 while respecting those different features and preserving them for the future. 337 00:26:17,500 --> 00:26:19,780 Economic development, the main change we had here, 338 00:26:20,360 --> 00:26:23,060 was categorizing our different types of economic development zones. 339 00:26:23,480 --> 00:26:26,200 Since 2010, we've identified economic development zones, 340 00:26:26,200 --> 00:26:29,200 which is where we want to target those economic development efforts 341 00:26:29,200 --> 00:26:30,360 of the county pursues. 342 00:26:31,360 --> 00:26:34,840 In the previous plans, they're all treated the same no matter where they are. 343 00:26:35,280 --> 00:26:37,220 As part of this effort, we categorize them 344 00:26:37,220 --> 00:26:39,160 to different types based on existing conditions 345 00:26:39,160 --> 00:26:40,220 and what their needs are. 346 00:26:40,340 --> 00:26:43,420 So emerging employment hubs, those are green field sites 347 00:26:43,420 --> 00:26:46,320 that have the potential to really accommodate larger scale 348 00:26:46,320 --> 00:26:47,700 economic development projects. 349 00:26:47,960 --> 00:26:51,220 There is one new emerging employment hub that's located north of the town 350 00:26:51,220 --> 00:26:51,900 of Ashland. 351 00:26:52,560 --> 00:26:55,280 Establish employment hubs, these are areas where there's already existing 352 00:26:55,280 --> 00:26:59,220 businesses and there's not a lot of green field development potential but we want to support 353 00:26:59,220 --> 00:27:03,000 those existing businesses there to make sure that they remain viable. 354 00:27:03,280 --> 00:27:08,640 One example of that is the industrial airpark and then one new concept is having a renewal 355 00:27:08,640 --> 00:27:09,100 areas. 356 00:27:09,200 --> 00:27:12,840 These are areas where we can invest in streetscape improvements or other types of improvements 357 00:27:12,840 --> 00:27:16,520 to continue to make them attractive for businesses such as mechanics full village. 358 00:27:19,270 --> 00:27:24,730 Rule and agriculture, this is a new chapter as part of this draft update process and this 359 00:27:24,730 --> 00:27:29,070 This is on the 78% of the county that is intended to remain rural, 360 00:27:29,490 --> 00:27:34,090 strategy related to land preservation, residential development outside the suburban service area, 361 00:27:34,270 --> 00:27:38,310 how that development can occur and still be sensitive to those rural surrounding uses, 362 00:27:38,730 --> 00:27:40,690 and then fostering the local agricultural economy. 363 00:27:41,390 --> 00:27:45,250 One thing we hear through the outreach process is even people that live in the suburban area wanted 364 00:27:45,250 --> 00:27:47,950 to have that rural feel in their neighborhoods and their communities. 365 00:27:48,190 --> 00:27:53,370 So there's some strategies on how to incorporate rural elements into more intensity 366 00:27:53,370 --> 00:27:56,570 in residential developments within the suburban service area. 367 00:27:58,600 --> 00:27:59,480 Housing is a new chapter 368 00:27:59,480 --> 00:28:03,880 that's not in the 2018 plan based on feedback we receive from experts in the 369 00:28:03,880 --> 00:28:07,140 community participation team as well as the Board of Supervisors. They're 370 00:28:07,140 --> 00:28:11,040 stradged that really focus on how we invest in our existing housing stocks since we 371 00:28:11,040 --> 00:28:15,500 do have ageing housing stock here in the county, exploring density bonuses for workforce 372 00:28:15,500 --> 00:28:20,200 housing, perhaps using surplus county only and for affordable workforce housing 373 00:28:20,200 --> 00:28:23,980 that comes available, raising awareness affordability challenges that again 374 00:28:23,980 --> 00:28:28,300 continuing to invest or spurring investment within our established neighborhoods. 375 00:28:30,810 --> 00:28:35,710 Active living was a new chapter in 2018 based on the lessons learned since that chapter 376 00:28:35,710 --> 00:28:36,410 was introduced. 377 00:28:36,850 --> 00:28:40,910 We've made some changes to enhance it and make it a more usable part of our plan. 378 00:28:41,290 --> 00:28:45,730 There's more design guidance on how sidewalks and bikeways can be incorporated into residential 379 00:28:45,730 --> 00:28:46,830 and commercial development. 380 00:28:47,370 --> 00:28:50,990 Most of these recommendations relate to development within the suburban service area. 381 00:28:51,410 --> 00:28:55,190 Regional trail networks, the fall line trails coming online, how do we capitalize on 382 00:28:55,190 --> 00:28:56,950 that particular investment in our community. 383 00:28:57,690 --> 00:29:00,230 And then with the limited dollars we have for sidewalks, 384 00:29:00,350 --> 00:29:02,950 bikeways, the plan identifies priority areas 385 00:29:02,950 --> 00:29:04,250 where we want to invest those dollars 386 00:29:04,250 --> 00:29:06,930 so they have the biggest impact for the buck. 387 00:29:10,260 --> 00:29:12,580 Transportation, we looked at our functional classifications 388 00:29:12,580 --> 00:29:14,480 what different road types are classified as 389 00:29:14,480 --> 00:29:16,240 and there were a few changes related to that. 390 00:29:16,700 --> 00:29:18,560 One new concept was focus corridors. 391 00:29:18,840 --> 00:29:20,760 We have limited transportation dollars. 392 00:29:20,940 --> 00:29:24,360 So based on the analysis we conducted looking at, 393 00:29:24,360 --> 00:29:26,240 existing capacity and congestion issues, 394 00:29:26,240 --> 00:29:31,440 potential future capacity issues, as well as some different connections in the network. 395 00:29:31,860 --> 00:29:36,580 These focus corridors are ones that we want to monitor during the planning horizon and 396 00:29:36,580 --> 00:29:40,600 where we might want to prioritize transportation dollars as they become available. 397 00:29:40,940 --> 00:29:45,580 There's 27 road segments, designated focus corridors, most of those are in the suburban 398 00:29:45,580 --> 00:29:49,660 service area, but there are some rural segments that are designated as part of that focus 399 00:29:49,660 --> 00:29:51,000 corridor network as well. 400 00:29:51,000 --> 00:29:59,820 Concept roads have always been part of the plan since 1972 these are future roads that could be built as development occurs most of these roads 401 00:30:00,000 --> 00:30:07,240 Have any funding or plans associated with them to realize construction in the near term? So, for example, 402 00:30:07,400 --> 00:30:13,020 creating parkways on that particular map. It's been on the map since the 1990s and is still not 403 00:30:13,020 --> 00:30:16,840 been completely realized. But these are roads we want to think about as development occurs in certain 404 00:30:16,840 --> 00:30:23,620 areas and how we can make key connections to accommodate anticipated land uses. Updated typical sections 405 00:30:23,620 --> 00:30:29,980 on what the roads could look like but we want to plan for where it's growth occurs. And we also 406 00:30:29,980 --> 00:30:34,780 transportation, promoting interconnectivity, conducting more studies of those 407 00:30:34,780 --> 00:30:38,140 concepts, we better understand where they go and how they impact the 408 00:30:38,140 --> 00:30:41,920 transportation network, and then studying the possible interstate 95 409 00:30:41,920 --> 00:30:44,600 interchange north of the town of Ashland, that's something that's been in 410 00:30:44,600 --> 00:30:49,680 the plans since 1972, and this strategy helps move that forward in 411 00:30:49,680 --> 00:30:54,280 term and whether or not that's an appropriate infrastructure improvement. 412 00:30:56,980 --> 00:31:01,980 Environment, there are some gradually protecting and improving water quality, protecting titles, 413 00:31:02,160 --> 00:31:05,740 rivers and streams, working collaborative with the public and private entities for 414 00:31:05,740 --> 00:31:11,040 technological habitats, and minimizing light pollution, DEQ is looking at this draft plan 415 00:31:11,040 --> 00:31:14,940 right now and we anticipate some guidance from them and feedback from them. 416 00:31:15,320 --> 00:31:19,340 Resiliency is a new part of the environment chapter that focuses on hazard mitigation, how 417 00:31:19,340 --> 00:31:24,340 do prepare for potential hazards, how do we efficiently use resources, renewable energy, 418 00:31:24,340 --> 00:31:30,880 provide some guidance on how we address solar facilities and those types of things. 419 00:31:31,140 --> 00:31:34,400 And then historic and culturally sensitive communities, how do we consider the impacts 420 00:31:34,400 --> 00:31:39,500 to communities that might not have been involved in the public decision-making process as 421 00:31:39,500 --> 00:31:40,920 other communities have in the past. 422 00:31:42,700 --> 00:31:46,880 Community facilities, this chapter deals with all of the public infrastructure we have in the 423 00:31:46,880 --> 00:31:51,480 county and the major facilities that are intended to serve the existing and future population. 424 00:31:51,480 --> 00:31:57,960 So, based on the population forecast through 2045 that 1% anticipated growth rate, it 425 00:31:57,960 --> 00:32:00,900 implies needs as well as any potential facilities. 426 00:32:02,620 --> 00:32:06,500 One component of this chapter is to update our economic developments, strategic plan, 427 00:32:06,720 --> 00:32:10,700 parks and recreation, master plan, as well as the water and wastewater facilities plan. 428 00:32:10,960 --> 00:32:14,840 So, we take a deeper dive in each topic area and really understand and can move forward 429 00:32:14,840 --> 00:32:18,700 on how to provide the best infrastructure most efficiently to our community. 430 00:32:20,340 --> 00:32:25,840 One new chapter is implementation, so throughout the chapter we have all these different objectives 431 00:32:25,840 --> 00:32:30,800 and strategies that we want to pursue over the planning horizon, this implementation chapter 432 00:32:30,800 --> 00:32:35,480 identifies programs and different initiatives that could implement one or more of those strategies. 433 00:32:35,780 --> 00:32:40,160 So conducting small area plans, relaunching the citizens' planning academy, reviewing our 434 00:32:40,160 --> 00:32:44,340 subdivisions and zoning ordinances and seeing how they align with the plan, evaluating 435 00:32:44,340 --> 00:32:48,740 our proper policy and updating the parks and wreck master plan and other topical plans that 436 00:32:48,740 --> 00:32:55,420 These are all different examples of what's the implementation chapter that can help move all those different strategies forward. 437 00:32:59,060 --> 00:33:04,280 So the Board of Supervisors has held several workshops throughout the planning process and you all 438 00:33:04,280 --> 00:33:08,320 as the Planning Commission held a joint workshop with the Board of Supervisors on July 26. 439 00:33:08,940 --> 00:33:13,380 Based on discussion at that workshop, there are a couple of different outstanding issues 440 00:33:13,380 --> 00:33:17,940 that I just wanted to introduce in my presentation and we can discuss after the public hearing. 441 00:33:18,040 --> 00:33:20,400 There might be additional issues that come up during the public hearing. 442 00:33:20,400 --> 00:33:32,540 Again, these are three or sorry, five outstanding issues I'd want to introduce, they're also described in the staff report that warn some future discussion or further discussion and recommendations from the Planning Commission. 443 00:33:34,360 --> 00:33:44,400 Some of the feedback at the meeting talked about introductory language really clarifying what the role of the comprehensive plan is in terms of land use planning and capital improvement planning. 444 00:33:45,300 --> 00:33:49,040 There's some language and a staff report that could be added to the 445 00:33:49,040 --> 00:33:53,480 Interruptory chapter if the planning commission deems that appropriate to really clarify again 446 00:33:53,480 --> 00:33:57,340 What is the role of the conference of plan as a planning commission in the Board of 447 00:33:57,340 --> 00:33:59,080 Society for people residents make decisions? 448 00:34:00,680 --> 00:34:05,780 There are fair buffers. There was a lot of discussion about thoroughfair buffers throughout the planning process 449 00:34:05,780 --> 00:34:10,780 Many residents indicated that they'd like to have a more robust thoroughfair buffers 450 00:34:10,780 --> 00:34:14,400 So they can screen development from view and help maintain that rural character 451 00:34:14,400 --> 00:34:20,220 There are some specific recommendations regarding the width of buffers and there were some concerns 452 00:34:20,220 --> 00:34:23,880 expressed by some members of the Planning Commission aboard regarding those recommended 453 00:34:24,440 --> 00:34:24,920 widths. 454 00:34:25,220 --> 00:34:29,060 There are some sample language that could be a consideration for the Planning Commission in 455 00:34:29,060 --> 00:34:29,780 the staff report. 456 00:34:30,280 --> 00:34:34,380 So some options we wanted to discuss and get feedback on are, do you want to keep the recommended 457 00:34:34,380 --> 00:34:37,500 width says is, do you want to change the recommended widths? 458 00:34:37,560 --> 00:34:41,440 Do you want to take them out and have a more qualitative description of what the third 459 00:34:41,440 --> 00:34:45,720 We have buffers are intended to do screen development with different types of design features 460 00:34:45,720 --> 00:34:46,700 that could be used. 461 00:34:47,040 --> 00:34:51,300 Again, that's something that we want to guide and saw because there wasn't a lot of consistency 462 00:34:51,940 --> 00:34:54,600 on what was discussed at that joint workshop. 463 00:34:57,040 --> 00:35:01,220 Transition between uses, as I mentioned, really major thing we heard throughout the planning 464 00:35:01,220 --> 00:35:05,560 process is how do you provide transition between different use types in between the rural 465 00:35:05,560 --> 00:35:07,320 areas in suburban service areas. 466 00:35:07,320 --> 00:35:13,880 There is some specific guidance in the draft plan on how transitions could occur where a residential 467 00:35:13,880 --> 00:35:18,220 use or a lower intensity use about a higher intensity use in vice versa. 468 00:35:18,440 --> 00:35:25,240 There were concerns in that particular document amongst the members present that maybe we 469 00:35:25,240 --> 00:35:27,640 don't need to have a specific width in there. 470 00:35:27,740 --> 00:35:32,520 We can just describe different features that could be part of effort to provide transition 471 00:35:32,520 --> 00:35:33,580 for different use types. 472 00:35:33,760 --> 00:35:35,800 So that's something we'd like some kind of so on as well. 473 00:35:36,880 --> 00:35:43,020 Building materials and design, there's concern about the recommendations in the plan about building materials and design, 474 00:35:43,120 --> 00:35:50,540 the relatively high level recommendations they don't provide requirements regarding particular styles, 475 00:35:50,740 --> 00:35:54,960 or anything like that, but there are some recommendations on building materials and different design features 476 00:35:54,960 --> 00:35:57,740 that could be incorporated into different development types. 477 00:35:58,000 --> 00:36:03,260 A lot of this comes from what was offered as part of previous rezoning cases and what other localities are doing in the region. 478 00:36:04,640 --> 00:36:12,100 And then there are six areas in the general land use plan that have kind of stuck around in terms of differing feedback and opinions. 479 00:36:12,380 --> 00:36:16,580 The Board of Supervisors has discussed these twice and these were discussed with the joint workshop as well. 480 00:36:17,180 --> 00:36:24,680 Some of these areas include how what uses our appropriate intersection of Route 301 rule point road in Uashk Road. 481 00:36:26,360 --> 00:36:32,140 Another area of discussion has been Metabirds Road, Shady Grove Road at Interstate 295. 482 00:36:32,140 --> 00:36:39,180 In the staff report, there's some a suggestion that maybe that southeast corner could be changed in the 2018 plan. 483 00:36:39,580 --> 00:36:41,600 It's recommended for multi-family development. 484 00:36:42,120 --> 00:36:46,320 In the current draft of the Invision Hanover plan, it's recommended to suburban high. 485 00:36:46,560 --> 00:36:53,380 Since that joint workshop, you all held there was a neighborhood meeting where the residents really seem to support neighbor who commercial at that southeast corner. 486 00:36:53,720 --> 00:36:56,860 So that's a potential change we can consider that's in the Chicago Harmony District. 487 00:36:56,860 --> 00:37:02,600 Poll Green Road, there was a quest to have more highway commercial between 1995 and Bell Creek Road. 488 00:37:03,300 --> 00:37:06,460 That's in on the boundary of the Henry and the Kanksville district. 489 00:37:06,720 --> 00:37:11,580 That issue was resolved based on the suggestion from a board member that we modify the description 490 00:37:11,580 --> 00:37:17,640 of the Employment Center designation to recognize that retail uses can be part of a master plan project. 491 00:37:18,140 --> 00:37:23,000 If it all is compatible with the surrounding uses in the Employment Center designation, 492 00:37:23,000 --> 00:37:28,320 so that one has been addressed. U.S. Route 33 at Winschurch Road, State Route 54 at the Eastern 493 00:37:28,320 --> 00:37:31,480 Town Limits, that's a transition area where there's been a discussion on what uses 494 00:37:31,480 --> 00:37:36,280 maybe appropriate, and then new ash cake road at sliding hill road. There's an area between 495 00:37:36,280 --> 00:37:40,980 the adjacent to the airport where there's been different opinions of what uses maybe appropriate 496 00:37:40,980 --> 00:37:41,700 there. 497 00:37:44,360 --> 00:37:48,360 So again, those are just some of the issues that we heard of the joint workshop. We 498 00:37:48,360 --> 00:37:52,760 wanted to get direction on as a move forward. In terms of next steps, the Planning Commission 499 00:37:52,760 --> 00:37:56,820 public hearing will be held tonight. After the public hearing and discussion, you all may 500 00:37:56,820 --> 00:38:02,240 recommend approval of the draft plan is presented. You may recommend approval with revisions 501 00:38:02,240 --> 00:38:06,880 and listening revisions you'd like staff to make, or you can defer a decision to the regular 502 00:38:06,880 --> 00:38:11,860 meeting, which will be next week, August 17th. Once the Planning Commission makes a recommendation 503 00:38:11,860 --> 00:38:16,300 on the draft plan, it's forwarded to the Board of Supervisors who will also hold a public hearing, 504 00:38:16,820 --> 00:38:21,800 and their final decision would be the final plan that will be used over the next several years 505 00:38:21,800 --> 00:38:25,280 into the next update, which would be in 2028. 506 00:38:28,020 --> 00:38:30,360 One thing I really want to mention, we talked about the public engagement. 507 00:38:30,500 --> 00:38:34,860 This has really been a team effort and collaboration amongst the citizens that have come 508 00:38:34,860 --> 00:38:35,580 to these meetings. 509 00:38:35,820 --> 00:38:37,040 The community participation team. 510 00:38:37,160 --> 00:38:38,500 We want to thank them for all their efforts. 511 00:38:38,740 --> 00:38:42,000 You all were on the community participation team as well as six citizens. 512 00:38:42,600 --> 00:38:45,920 The planning commission, the Board of Supervisors, multiple different departments have been 513 00:38:45,920 --> 00:38:47,380 involved and really had some great ideas. 514 00:38:47,900 --> 00:38:52,060 So getting to this point has really been a team effort and has been really great to work with 515 00:38:52,060 --> 00:38:55,520 everyone in the solicitate discussion to get these different ideas, not everyone might agree 516 00:38:55,520 --> 00:38:59,000 with the ideas or concepts in the draft plan, there's been a lot of great discussion 517 00:38:59,000 --> 00:39:03,160 over the past two years. So I really appreciate y'all's help as well as the other citizen 518 00:39:03,160 --> 00:39:05,740 members of the community participation team. 519 00:39:07,060 --> 00:39:11,020 So that's all from my presentation. I'd be happy to answer any questions right now or wait 520 00:39:11,020 --> 00:39:12,060 until after the public hearing. 521 00:39:14,340 --> 00:39:18,700 I think we'll wait till after the public hearing because some things may come up that 522 00:39:18,700 --> 00:39:22,300 commissioners have questions on as well at that time, but if everyone is okay with that. 523 00:39:23,840 --> 00:39:29,060 Okay. Okay. How many people here tonight would like to speak on the comprehensive 524 00:39:29,060 --> 00:39:32,760 plan would you raise your hand? I don't have one. 525 00:39:44,680 --> 00:39:45,140 All right. 526 00:39:50,020 --> 00:39:56,760 I see about 14 hands because of time constraints. We normally allow 15 minutes 527 00:39:56,760 --> 00:40:02,660 or comments. If we do three minutes, we're going to go from 15 to 42 assume that there's 528 00:40:04,340 --> 00:40:12,840 So what we want to do is to allow each person up to three minutes, stage a name, the district 529 00:40:12,840 --> 00:40:21,380 that you're in, try to limit your time to the three minutes, Mr. Hazel will keep track 530 00:40:21,380 --> 00:40:28,360 of time and when you have 30 seconds left to go in your presentation, he'll let you know 531 00:40:28,360 --> 00:40:32,640 so you can try to wrap things up, is everyone okay with that? 532 00:40:33,120 --> 00:40:36,220 That's almost tripling their mentality and normal haio. 533 00:40:36,720 --> 00:40:40,260 So having said that, first speaker can come up, Mr. Nelson, 534 00:40:40,320 --> 00:40:44,000 you want to come up first, stage a name, district, 535 00:40:45,400 --> 00:40:46,560 and see what you come up with, sir. 536 00:40:48,440 --> 00:40:49,400 Good evening, Chairman Bailey. 537 00:40:49,460 --> 00:40:51,300 Members of the Planning Commission, Mr. Hunter. 538 00:40:52,320 --> 00:40:53,660 My comment, my name is Bob Nelson. 539 00:40:53,660 --> 00:40:55,160 I reside in the National District. 540 00:40:55,160 --> 00:40:58,900 My comments tonight concern the parks and recreation section. 541 00:40:59,820 --> 00:41:02,240 I sent you a four-page critical review on Monday. 542 00:41:03,160 --> 00:41:06,460 First, in that review, I stated that there were no strategies in the 543 00:41:06,460 --> 00:41:07,800 advantage and had an overdraft. 544 00:41:08,820 --> 00:41:09,800 I was dead wrong. 545 00:41:10,580 --> 00:41:12,120 There are strategies in the draft. 546 00:41:12,660 --> 00:41:16,420 I failed to properly check for them and apologize for that failure. 547 00:41:16,420 --> 00:41:26,860 Second, 2007 and 2018 Virginia Outdoor plans, and the 2010 Parks and Recreation Master Plan, 548 00:41:27,300 --> 00:41:34,380 all recommended a minimum of 10 acres per 1000 population for neighborhood, community, 549 00:41:34,780 --> 00:41:41,020 and district parks, three acres for neighborhood parks, three acres for community parks, 550 00:41:41,020 --> 00:41:43,420 and four acres for district parks. 551 00:41:44,280 --> 00:41:47,780 The Envision Hanover Draft claims three acres is sufficient 552 00:41:48,220 --> 00:41:51,000 for neighborhood and community parks. 553 00:41:51,880 --> 00:41:52,500 It's not. 554 00:41:53,480 --> 00:41:55,580 Six acres is the recommended minimum. 555 00:41:56,820 --> 00:42:00,160 Using six acres for neighborhood and community parks, 556 00:42:00,200 --> 00:42:07,860 doubles the recommended acreage in the draft from 345 to 690 in 2025. 557 00:42:08,680 --> 00:42:12,960 Hanover is deficient in that category by over 650 acres. 558 00:42:14,560 --> 00:42:21,700 Third, both the 2007 and 2018 Virginia Outdoor Plans contain a playground designation 559 00:42:21,700 --> 00:42:23,340 with no minimum acreage. 560 00:42:24,420 --> 00:42:28,700 This classification can be oriented to children or adults 561 00:42:28,700 --> 00:42:31,160 and may include passive recreation. 562 00:42:32,180 --> 00:42:33,420 Call it what you want. 563 00:42:33,420 --> 00:42:41,720 pocket, small or playground. This state designate state recognized park classification should 564 00:42:41,720 --> 00:42:47,400 be included in the Invision Handover Draft. Developing small public parks is vital to 565 00:42:47,400 --> 00:42:52,640 preserving affordable housing and revitalizing handover's older established subdivisions. 566 00:42:53,800 --> 00:43:00,140 Fourth, the 2010 master plan recommends new neighborhood community, neighborhood community 567 00:43:00,140 --> 00:43:08,360 district parks. In 13 years, Hanover hasn't added any new parks or developed the two undeveloped 568 00:43:08,360 --> 00:43:16,520 parks, winding Brook and Little River. The park plan hasn't been implemented. Park needs 569 00:43:16,520 --> 00:43:23,600 haven't been addressed in the SSA, where 69% of Hanover's population is, thank you. 570 00:43:23,600 --> 00:43:30,320 A basic comprehensive planning issue is infrastructure 571 00:43:30,320 --> 00:43:37,340 advocacy and over needs an honest assessment of county parks and open space in my view 572 00:43:37,340 --> 00:43:44,740 it's lacking. The park and recreation section needs to be reviewed, revised, and rewritten. 573 00:43:45,740 --> 00:43:46,300 Thank you. 574 00:43:46,340 --> 00:43:47,940 Thank you, Mr. Nielsen. 575 00:43:48,620 --> 00:43:49,760 Okay, next speaker, please. 576 00:43:57,760 --> 00:43:59,900 Good evening members of the Commission. 577 00:44:00,060 --> 00:44:03,300 My name is Patty Blan, and I reside in the beaver dam district. 578 00:44:04,340 --> 00:44:09,660 First I'd like to say that the draft plan has many aspects that have improved and are 579 00:44:09,660 --> 00:44:12,900 going in the right direction, and I'm thankful for that. 580 00:44:13,420 --> 00:44:18,280 But I'd like to address two items needing some change in the draft comprehensive plan. 581 00:44:19,240 --> 00:44:25,800 A favor keeping the pre-red lined text for buffers and open space in the site design standards 582 00:44:25,800 --> 00:44:32,200 with each zoning type. I think we need to keep a reasonably high bar that could be negotiated 583 00:44:32,200 --> 00:44:38,940 due to challenging site conditions, but only during an application process. For instance, 584 00:44:39,100 --> 00:44:45,320 why not keep 20% open space in the suburban transitional residential instead of knocking it down 585 00:44:45,320 --> 00:44:53,360 to 15? Or why not a 75 foot buffer instead of 50 feet in a transition area from multifamily residential 586 00:44:53,360 --> 00:44:58,460 to lower density uses. We need unapologetic standards for site 587 00:44:58,460 --> 00:44:59,980 design or else our end. 588 00:45:00,000 --> 00:45:07,440 Restoration for stronger aesthetic and environmental protections, just vaporizes under development pressure. 589 00:45:08,920 --> 00:45:18,700 I will also speak to strategy R4J in the rural AG section, a strategy speaking to the possibility of establishing a rural support program position. 590 00:45:18,700 --> 00:45:25,560 Instead of the introductory phrasing, investigate the feasibility of creating a rural support 591 00:45:25,560 --> 00:45:32,960 program position, which sounds very timid and tentative, I suggest perform a feasibility 592 00:45:32,960 --> 00:45:35,500 study for a rural support position. 593 00:45:36,860 --> 00:45:41,220 We say we want Hanover County to be a great place to live, work, and play. 594 00:45:42,140 --> 00:45:46,400 We have to back it up with firm resolve and crystal clear language. 595 00:45:46,940 --> 00:45:47,600 Thank you. 596 00:45:47,600 --> 00:45:50,120 Thank you, Ms. Boyam. 597 00:45:50,660 --> 00:45:51,480 Next speaker, please. 598 00:45:57,560 --> 00:46:01,900 Hi, my name is Elizabeth Raffordy, and I am the Chikahomni district representative 599 00:46:02,740 --> 00:46:07,460 on the economic development authority here for the county, and I'm here to speak in 600 00:46:07,460 --> 00:46:11,580 support of the comprehensive plan update, and particularly the designations of the 601 00:46:11,580 --> 00:46:13,820 economic development zones that he outlined. 602 00:46:14,260 --> 00:46:19,700 We understand and respect the desire of the county to designate over 75% of the land 603 00:46:19,700 --> 00:46:24,500 area as rural and outside of the suburban service area, but we feel this gives stronger reason 604 00:46:24,500 --> 00:46:28,980 to better utilize the small portion of the county that is designated as economic development 605 00:46:28,980 --> 00:46:34,160 areas and hubs. This means more strategic and intentional focus on quality development 606 00:46:34,160 --> 00:46:39,800 and projects, which bring higher wages, greater tax revenue, and decreased truck traffic. 607 00:46:40,280 --> 00:46:44,940 And they're recently completed target industry analysis conducted by Virginia Tech sectors, 608 00:46:44,940 --> 00:46:51,300 such as biotech, data centers, and advanced manufacturers, advanced manufacturing, where identified 609 00:46:51,300 --> 00:46:53,420 as targets for which the county can attract. 610 00:46:53,880 --> 00:46:57,740 These sectors would easily be able to establish and successfully operate in the economic 611 00:46:57,740 --> 00:47:00,180 development zones that the plan has identified. 612 00:47:00,840 --> 00:47:05,040 In addition to identifying areas for future strategic development, we support language in the 613 00:47:05,040 --> 00:47:09,360 plan that emphasizes the improved setbacks, buffers, and transitions, which will make 614 00:47:09,360 --> 00:47:12,820 these types of strategic developments better fit within our community. 615 00:47:12,820 --> 00:47:20,900 We face significant expenses in the future from maintaining existing infrastructure as well as proposed capital investments in schools, parks and utilities. 616 00:47:21,400 --> 00:47:30,740 By focusing on quality development in these specialized zones, the county can encourage the types of projects which will generate strong revenue to help address funding needs well into the future. 617 00:47:31,280 --> 00:47:38,140 We're appreciative of county staff and all the work that you've done and we hope that you will support approval of the plan. 618 00:47:38,740 --> 00:47:39,160 Thank you. 619 00:47:39,160 --> 00:47:40,060 Thank you. 620 00:47:45,470 --> 00:47:45,970 Next speaker. 621 00:47:47,370 --> 00:47:48,090 Yes, sir? 622 00:47:49,350 --> 00:47:49,710 Good evening. 623 00:47:49,830 --> 00:47:53,890 My name is Tim Merrell, I'm in the National District, and I am also a fellow planning 624 00:47:53,890 --> 00:47:54,350 commissioner. 625 00:47:55,090 --> 00:47:58,490 So I want to thank you all for your service and I understand the commitment required to 626 00:47:58,490 --> 00:48:01,910 see a comprehensive plan update through, and I've been impressed with what I've seen on the 627 00:48:01,910 --> 00:48:03,430 website and the meetings that I've attended. 628 00:48:03,670 --> 00:48:04,750 So thank you for your service. 629 00:48:04,950 --> 00:48:06,430 I appreciate your time on this project. 630 00:48:07,030 --> 00:48:10,390 I would like to draw your attention to one section of the plan, however, that the town would 631 00:48:10,390 --> 00:48:13,110 like you to reconsider, and I have four points to address. 632 00:48:13,110 --> 00:48:17,330 it's particularly relation to the Woodside Parallel Road proposal. 633 00:48:19,330 --> 00:48:23,630 The four points I'd like to make are one to reference the history of this area of Ashland. 634 00:48:24,110 --> 00:48:32,490 In 2007, the Hanover County thoroughfare plan did designate Woodside Lane as a major collector with a hundred foot setback 635 00:48:32,490 --> 00:48:37,330 right of way to access the plan development of the county further to the north of the town. 636 00:48:37,330 --> 00:48:45,450 Back down Woodside Lane was within the town boundaries and through a discussion with the town and the county and the state 637 00:48:45,450 --> 00:48:51,530 the border of the town was shifted inside to the east to the west side excuse me of Woodside Lane 638 00:48:52,670 --> 00:49:00,450 and understanding that the intention for that road was to be a major collector back in 2018. 639 00:49:00,450 --> 00:49:08,390 The change that came suddenly for my second point was while the town and the staff are 640 00:49:08,390 --> 00:49:12,610 only recently engaging in the preliminary discussions about the county's plan to add 641 00:49:12,610 --> 00:49:18,970 this parallel road, it was surprising to see it appear as a major collector located just 642 00:49:18,970 --> 00:49:23,410 800 feet west of Woodside putting it within the town limits. 643 00:49:24,030 --> 00:49:28,510 Without really town awareness or participation or opportunity to discuss this change to the 644 00:49:28,510 --> 00:49:38,530 So it's understandable that perhaps this was done due to citizen input from the members of the communities that are adjacent to Woodside Lane. 645 00:49:39,090 --> 00:49:48,370 But the town would like an opportunity again to engage and have more of a longstanding discussion about this change and this proposed addition to this major collector. 646 00:49:48,370 --> 00:50:12,070 My third point is obviously related to traffic, and the proposed parallel road to Woodside Lane would obviously create another intersection on to Route 54 east of town, which is already encouraging some concerns from residents that I've heard as a planning commissioner about the potential for additional traffic and additional congestion, additional lights going up at Mount Herman Road, perhaps in this adding another one. 647 00:50:12,070 --> 00:50:18,950 to that section, you also may know about the diverging diamond approach that is going to occur on 54 over 648 00:50:18,950 --> 00:50:24,610 on 95, which is going to add additional traffic changes to the area, and we just thought this was 649 00:50:24,610 --> 00:50:32,110 another added perhaps burden to the citizens with this collector parallel major road. The fourth point I want to 650 00:50:32,110 --> 00:50:38,690 make is about the proposal of this road to split Washington, Lacey Park. It's one of my favorite parks in the 651 00:50:38,690 --> 00:50:47,890 I ride my bike through that park regularly and this road would create a four lane major or two a road through that park and again 652 00:50:47,890 --> 00:50:53,290 I would like the commissioners to reconsider that so in conclusion, thank you again for your work 653 00:50:53,290 --> 00:51:01,130 I appreciate the delicacy and the sensitivity of producing a significant plan like this and my ask is 654 00:51:01,130 --> 00:51:07,170 of myself as a citizen and of my fellow planning commissioners for you to reconsider that part of the plan 655 00:51:07,170 --> 00:51:07,910 Now, thank you, much. 656 00:51:08,350 --> 00:51:08,910 Thank you, sir. 657 00:51:09,810 --> 00:51:11,050 I'll acknowledge to it. 658 00:51:11,150 --> 00:51:19,390 We've also got an email today, I think, from Amy, hey, I don't know if you know her or not, 659 00:51:21,430 --> 00:51:25,590 who is on the Ashland Planning Commission who really sort of voiced the same concerns 660 00:51:25,590 --> 00:51:26,430 that you did. 661 00:51:26,810 --> 00:51:30,610 So I'll acknowledge, you know, we have gotten an email from her about that as well, but thank 662 00:51:30,610 --> 00:51:31,330 you for your comments. 663 00:51:31,850 --> 00:51:32,710 Next speaker, please. 664 00:51:33,970 --> 00:51:34,350 Yes, ma'am. 665 00:51:40,530 --> 00:51:40,890 Hi. 666 00:51:40,890 --> 00:51:43,270 Good evening, Chairman Bailey, members of the Commission. 667 00:51:43,490 --> 00:51:44,910 My name is Elizabeth Greenfield. 668 00:51:45,210 --> 00:51:47,390 I represent the Home Building Association of Richmond. 669 00:51:48,090 --> 00:51:52,750 We represent builders, developers, and a variety of industries 670 00:51:52,750 --> 00:51:55,210 that support home building and land development. 671 00:51:55,710 --> 00:51:57,690 I'd like to start by thanking you and the staff 672 00:51:57,690 --> 00:52:00,070 for all your hard work that's gone into this plan. 673 00:52:00,610 --> 00:52:03,270 And also thank you for the introduction of the housing chapter. 674 00:52:03,990 --> 00:52:06,430 I'm not here to oppose support, but I'm here 675 00:52:06,430 --> 00:52:10,170 just to offer a couple of comments about some of the language 676 00:52:10,170 --> 00:52:16,330 the chapter and items to think forward or excuse me, think of as you continue discussion on buffers 677 00:52:16,330 --> 00:52:21,670 and move into the implementation phase. The housing chapter notes that housing costs have 678 00:52:21,670 --> 00:52:25,910 continued to rise and that makes it difficult for some segments of the workforce to find housing 679 00:52:25,910 --> 00:52:31,990 to meet their needs. The chapter also notes that there's been a 32% increase in the median home 680 00:52:31,990 --> 00:52:39,130 value between 2020 and 2022. A lot of that is not in your control. We know that housing is expensive, 681 00:52:39,130 --> 00:52:45,770 interest rates are rising but land as at a premium and it's also at a minimum. This plan also 682 00:52:45,770 --> 00:52:51,930 notes that you are consuming more lots than you're putting back on the ground. We need to see 683 00:52:51,930 --> 00:52:56,890 more inventory on the ground to keep up with housing population and if we're going to be able to 684 00:52:56,890 --> 00:53:01,970 provide any affordable workforce housing, we're going to need to do that at densities that aren't at 685 00:53:01,970 --> 00:53:06,370 one and a half to three units per acre. That's how you're going to get a variety of housing at 686 00:53:06,370 --> 00:53:11,850 from price points, so we're concerned that we won't be able to deliver the housing that 687 00:53:11,850 --> 00:53:16,530 we've heard some of your residents come in on in the public engagement process about 688 00:53:16,530 --> 00:53:22,130 needing more affordable workforce housing with the wide buffers, with taking some of the 689 00:53:22,130 --> 00:53:27,230 suburban service area down from one and one-half units to three units down to just the one 690 00:53:27,230 --> 00:53:32,530 and a half units with all severe requiring mandatory water and sewer connections, and while we 691 00:53:32,530 --> 00:53:35,990 want to see quality design and quality built housing. 692 00:53:36,190 --> 00:53:39,470 Some of the design standards will also just increase that cost. 693 00:53:40,390 --> 00:53:42,930 So again, I appreciate all the hard work that went into this. 694 00:53:43,090 --> 00:53:47,810 It cannot be easy balancing the thousands of comments that staff noted that were received. 695 00:53:48,430 --> 00:53:52,450 But as you move forward into the implementation phase, I would just ask that you keep in mind 696 00:53:52,450 --> 00:53:56,590 that we need to get more units on the ground and we need to do that in a way that there's 697 00:53:56,590 --> 00:53:59,890 a variety of price points that we're able to deliver. 698 00:54:00,390 --> 00:54:01,210 So thank you. 699 00:54:01,210 --> 00:54:02,610 Thank you, 700 00:54:04,970 --> 00:54:05,870 next speaker, 701 00:54:10,400 --> 00:54:11,240 let's try it. 702 00:54:14,720 --> 00:54:18,440 Good evening, Mr. Chair, members of the Planning Commission, my name's Larry Shire. 703 00:54:19,360 --> 00:54:24,320 I've lived in Hanover County for over 30 years. I've developed in Hanover County for over 30 years. 704 00:54:27,010 --> 00:54:33,550 Mr. Pompeii in his opening statement said that the compound is a long range plan. 705 00:54:34,310 --> 00:54:41,970 It is not a policy, it is not an ordinance. I feel like the compound in some respects is over reaching 706 00:54:42,250 --> 00:54:48,870 It's confusing and it's contradictory to the ordinance, which is the rule. 707 00:54:51,140 --> 00:54:55,180 He also spoke of the rule character of Hanover County. 708 00:54:56,000 --> 00:55:02,240 Well, 78% of Hanover County is rural, 78% check done. 709 00:55:02,340 --> 00:55:05,300 I don't know how much more you want for all to be. 710 00:55:05,300 --> 00:55:13,940 The implementation strategies on page five mentioned an implementation strategy is a policy. 711 00:55:15,120 --> 00:55:24,640 I do not think that the complaint should be rated as a policy because on page 14 it says the land use plan is advisory. 712 00:55:25,200 --> 00:55:30,440 There's contradiction right there in those two items right there. 713 00:55:30,440 --> 00:55:34,540 You have tons of contradiction when it comes to buffers. 714 00:55:34,800 --> 00:55:37,300 I don't know why buffers are in the comp plan. 715 00:55:37,760 --> 00:55:45,640 You did have 100 foot buffers, now you have 50 foot buffers, and then you're taking buffers all the way around property that have a different use. 716 00:55:46,320 --> 00:55:53,000 So, if you have an industrial use, there's a buffer on your property because you want to develop maybe townholds. 717 00:55:53,460 --> 00:55:57,920 Then there's agricultural behind you, then you have another buffer, then you have a thorough fair buffer. 718 00:55:57,920 --> 00:56:03,960 The ordinance doesn't have those buffers, so again, confusing, contradictory to the ordinance. 719 00:56:04,780 --> 00:56:08,520 I don't think the buffer should be in the compound at all. 720 00:56:10,020 --> 00:56:17,760 When you speak to the building standards, I just want to make note that there's one or two things in there. 721 00:56:18,380 --> 00:56:22,960 One of them speaks to what you want high end. 722 00:56:22,960 --> 00:56:30,760 I build high ed, you all know what I build, and I agree with that. That's great. That's what I build, 723 00:56:30,840 --> 00:56:35,220 so it doesn't matter to me. I'm going to build brick. I'm going to build high ed properties. 724 00:56:36,420 --> 00:56:43,660 But on the other hand, it says, mix affordable and workhouse housing with market rate units 725 00:56:43,660 --> 00:56:49,640 and design exterior so that affordable housing and workforce are indistinguishable from other housing 726 00:56:49,640 --> 00:56:58,040 types. It's impossible. It's impossible to do that unless there's some sort of subsidy from 727 00:56:58,040 --> 00:57:03,180 the county and I have not seen any type of subsidy from the county. So again, I just 728 00:57:03,180 --> 00:57:11,220 wouldn't want to say that Hanover County is rural. You don't need orchards in communities 729 00:57:11,220 --> 00:57:15,960 where after a while they're not going to take care of it. I know you have one or two communities 730 00:57:15,960 --> 00:57:21,440 that try to have that, and the buffer shouldn't be in there, and there's a lot of contradiction 731 00:57:21,440 --> 00:57:22,000 within it. 732 00:57:22,120 --> 00:57:22,940 Thank you so much. 733 00:57:23,060 --> 00:57:23,960 I appreciate your time. 734 00:57:24,520 --> 00:57:25,060 Thank you, sir. 735 00:57:35,450 --> 00:57:37,310 Good evening, members of the Commission. 736 00:57:37,590 --> 00:57:40,530 I'm Carolyn Cook, and I live in Beaverdam, District. 737 00:57:41,650 --> 00:57:49,870 At your pleasure, I'm going to read an email that you all received from President of 738 00:57:49,870 --> 00:57:53,290 as well, Ms. Hunter, the Mr. Pompeo, you probably 739 00:57:53,290 --> 00:57:55,650 did not receive it, so for your benefit, 740 00:57:56,770 --> 00:57:58,810 and with your permission, I will read it. 741 00:57:59,050 --> 00:58:00,210 Planning Commission members, 742 00:58:00,770 --> 00:58:02,790 as a resident of the beaver dam of district, 743 00:58:03,030 --> 00:58:05,430 I'm contacting you to voice opposition 744 00:58:05,430 --> 00:58:09,370 to any expansion of industrial or commercial land 745 00:58:09,370 --> 00:58:12,990 in the county as a function of the new comprehensive plan. 746 00:58:13,470 --> 00:58:16,770 Certainly the explosion in housing, mixed use, 747 00:58:17,090 --> 00:58:19,590 and certainly overwhelming warehouse construction 748 00:58:19,590 --> 00:58:22,290 needs to be curved, not further encouraged. 749 00:58:23,030 --> 00:58:26,110 The concept of an economic development zone between 750 00:58:26,110 --> 00:58:29,170 Ashland and Daweswell is unfathomable. 751 00:58:29,810 --> 00:58:32,210 Those of us who live here do so for a reason 752 00:58:32,210 --> 00:58:35,030 and don't want the part of the county north of Ashland 753 00:58:35,030 --> 00:58:38,210 looking sadly like what is happening around 754 00:58:38,210 --> 00:58:39,590 and south of Ashland. 755 00:58:39,990 --> 00:58:42,530 There is no infrastructure for anything like that 756 00:58:42,530 --> 00:58:43,790 in this part of the county. 757 00:58:44,310 --> 00:58:46,490 We need to be focusing on land preservation 758 00:58:46,490 --> 00:58:51,230 and lifestyle for the residents, not further rampant development. 759 00:58:52,130 --> 00:58:53,710 Thank you for your consideration. 760 00:58:54,110 --> 00:58:56,710 Please feel free to contact me at your convenience, 761 00:58:56,930 --> 00:58:57,770 and it is signed. 762 00:58:58,410 --> 00:59:01,550 Doug Boardman, Old Ridge Road, does well, Virginia. 763 00:59:02,450 --> 00:59:03,070 Thank you. 764 00:59:18,240 --> 00:59:19,240 Good evening, Chairman. 765 00:59:19,640 --> 00:59:21,500 And members of the Board, I'm Martha Wingfield, 766 00:59:21,500 --> 00:59:23,200 and I live in the Beaver Dam District. 767 00:59:24,580 --> 00:59:26,320 And I appreciate the many opportunities 768 00:59:26,320 --> 00:59:29,320 that this process has given us citizens 769 00:59:29,320 --> 00:59:35,240 to participate and give lots of feedback, you know, the varieties of venues, times, and events. 770 00:59:35,420 --> 00:59:39,940 It's been a really open and receptive process for citizens, 771 00:59:42,220 --> 00:59:42,960 you know, that I think this 772 00:59:42,960 --> 00:59:50,780 is about my sixth complaint update and I only mentioned that because I've been pretty consistent 773 00:59:50,780 --> 00:59:56,380 almost all of over all those complaint updates about the message and I think that is reflected 774 00:59:56,380 --> 00:59:59,520 in this update, we want to maintain the role character. 775 01:00:00,000 --> 01:00:09,560 That's what we, those of us that live in the rural area want to maintain the rural area. And I think our neighbors in the suburban service area want to do the same. 776 01:00:11,340 --> 01:00:19,800 And to achieve that, I support the design standards that are part of this complaint update. I think that will help make an insure that that happens. 777 01:00:19,800 --> 01:00:31,740 They were determined when there is development what standards they should meet from buffers to all the other areas that are addressed in the design standards. 778 01:00:31,980 --> 01:00:45,680 So I think that's a good move. I also support the new land use designation suburban transitional residential, which will allow single family dwellings of up to 1.5 at the edge of the SSA next to the rural area. 779 01:00:45,680 --> 01:00:50,860 because this will keep us having a hard edge of pretty dense development right up against 780 01:00:50,860 --> 01:00:51,760 foreign land. 781 01:00:53,580 --> 01:00:58,860 I also want to say that adding the rule ag chapter is a big step. 782 01:00:59,060 --> 01:01:01,800 We've gone from a paragraph to a chapter, so I think that's progress. 783 01:01:01,840 --> 01:01:02,800 I appreciate that. 784 01:01:03,240 --> 01:01:09,280 I want to certainly second what Mrs. Blan said about the need for a rule support program 785 01:01:09,280 --> 01:01:09,800 position. 786 01:01:10,380 --> 01:01:11,880 I'd say you don't need to study it. 787 01:01:12,060 --> 01:01:12,540 We need it. 788 01:01:12,580 --> 01:01:13,880 I think most of us know that. 789 01:01:13,880 --> 01:01:16,000 So I hope we will move in that direction. 790 01:01:17,180 --> 01:01:21,500 The last part that I want to bring up and that gives me the most concern is the chapter 791 01:01:21,500 --> 01:01:27,120 on transportation and all the roads that are in that chapter and all the focus areas and 792 01:01:27,120 --> 01:01:28,660 all the changes that might bring. 793 01:01:29,520 --> 01:01:35,040 I believe our transportation plans major goals should not be how do we get semi-tracked or 794 01:01:35,040 --> 01:01:39,860 trailers off in 95 when it's backed up or how do we get interstate traffic off in 95. 795 01:01:40,600 --> 01:01:43,320 You know, through back roads past the obstruction. 796 01:01:43,320 --> 01:01:48,580 And I think it should be, how do we protect and preserve and enhance the communities in 797 01:01:48,580 --> 01:01:49,800 neighborhoods that exist? 798 01:01:50,320 --> 01:01:55,180 And that's what I would ask that the transportation plan focus most on. 799 01:01:55,360 --> 01:02:01,700 As those of us that live here, how can it enhance our communities, how roads designed and 800 01:02:01,700 --> 01:02:08,760 improved or not, and how do we control traffic so it doesn't disrupt the rural neighborhoods? 801 01:02:09,360 --> 01:02:13,300 I appreciate the opportunity to have comments, and again, I really appreciate the opportunities 802 01:02:13,300 --> 01:02:18,580 We've had to participate, I think you've set a standard for our neighbors and other communities 803 01:02:18,580 --> 01:02:20,960 to follow in terms of how to get citizen input. 804 01:02:21,180 --> 01:02:22,420 So thank you. 805 01:02:22,500 --> 01:02:23,940 Thank you, Mr. Wilson, we can feel. 806 01:02:24,460 --> 01:02:24,940 Next speaker. 807 01:02:36,410 --> 01:02:38,750 I'd even ladies and gentlemen of the Planning Commission. 808 01:02:39,110 --> 01:02:40,230 My name is Jesse Lenin. 809 01:02:40,230 --> 01:02:41,930 I live in the Chicago State District. 810 01:02:43,130 --> 01:02:47,070 And I would just really would like to thank you all for the time and attention you've given 811 01:02:47,070 --> 01:02:47,870 to this. 812 01:02:47,870 --> 01:02:52,350 This is a pretty lengthy process to say the least with a lot of them moving parts. 813 01:02:53,490 --> 01:03:01,030 Just as a quick aside, something I've told my children, I heard it from someone else, is that we should all be very careful who we let in our head. 814 01:03:01,390 --> 01:03:04,970 No growth leads to stagnation, which ultimately leads to decline. 815 01:03:05,190 --> 01:03:07,430 It doesn't happen overnight, but it does happen. 816 01:03:09,050 --> 01:03:15,770 One thing that I did want to mention, which I was glad to hear someone from the Economic Development Commission, 817 01:03:15,770 --> 01:03:24,010 And our dimension was in page four under community character, I think it is community engagement. 818 01:03:24,370 --> 01:03:27,270 It mentions a comedy, high quality commercial. 819 01:03:27,950 --> 01:03:31,930 Seems like to me that word might be better used as in a courage. 820 01:03:33,030 --> 01:03:36,490 We do want to encourage commercial growth, I believe, in the county. 821 01:03:38,250 --> 01:03:44,550 I think the concern that I have is I think we're still kind of mixing up the advisory 822 01:03:44,550 --> 01:03:51,190 are aspirational components of the compound with the ordinance and to echo previous Mr. 823 01:03:51,350 --> 01:03:51,650 Shia. 824 01:03:52,290 --> 01:03:57,830 You know, when I look at things like community garden orchards and things to the sort, 825 01:03:57,930 --> 01:04:03,250 the buffers being in their shorter buildings versus really no mention of them at all, 826 01:04:03,870 --> 01:04:08,670 they do sort of belong more in the zoning ordinance, not so much in an aspirational or an 827 01:04:08,670 --> 01:04:09,770 advisory document. 828 01:04:10,710 --> 01:04:12,730 I have no problems with the being in the ordinance. 829 01:04:12,730 --> 01:04:24,110 It just seems like it's confusing to have them in both places, and confusion is obviously not a good thing for any locality to try and contend with. 830 01:04:26,480 --> 01:04:40,340 I found it interesting that on page 17 the county referenced with strategy, lu.1d, financial responsibility to its citizens as a property owner of rental properties as well as a developer. 831 01:04:41,020 --> 01:04:47,120 I have to be financially responsible to my residents and in order to do that I have to make sure 832 01:04:47,120 --> 01:04:53,220 that I have spent the money wisely to bring a quality product to the county by having 833 01:04:53,220 --> 01:04:58,340 these buffers in there, especially the very large ones, it's essentially a taking of the property. 834 01:04:58,780 --> 01:05:06,560 It devalues the land and it thereby decreases tax revenue and if I'm not mistaken, I think 835 01:05:06,560 --> 01:05:10,060 the tax revenue of something that the county can certainly use. 836 01:05:10,520 --> 01:05:13,100 I appreciate you taking a few moments to listen to my comments this evening. 837 01:05:13,640 --> 01:05:14,460 Thank you. 838 01:05:14,540 --> 01:05:15,700 Thank you, Mr. Lowe. 839 01:05:16,640 --> 01:05:17,400 Next week, please. 840 01:05:19,080 --> 01:05:19,580 Yes, ma'am. 841 01:05:22,230 --> 01:05:22,710 Good evening. 842 01:05:22,950 --> 01:05:24,310 My name is Nancy Young. 843 01:05:24,350 --> 01:05:28,230 I live on Old Telegraph Road in the South Anadistric. 844 01:05:29,110 --> 01:05:35,650 And what I'm going to say may seem trifling, considering all of the all encompassing things that 845 01:05:35,650 --> 01:05:51,730 people have addressed tonight. But what I would like to point out is there's some very specific words that are listed in this plan. And while we all may have an understanding of what it means. 846 01:05:52,550 --> 01:06:02,830 Ten years from now there may be all new planning commissioners and all new supervisors and they'll look back at this and they'll go, oh let's do this. 847 01:06:02,830 --> 01:06:04,510 here's what I'm addressing. 848 01:06:05,030 --> 01:06:08,490 And I also would like to thank everybody for all of the input 849 01:06:08,490 --> 01:06:12,290 that we've been able to give you all for your hard work. 850 01:06:12,630 --> 01:06:13,850 I've been to a lot of meetings. 851 01:06:14,410 --> 01:06:17,290 I'm sure you're very familiar with my face and sick 852 01:06:17,290 --> 01:06:19,870 and tired of looking at it because you've seen me a lot 853 01:06:19,870 --> 01:06:21,750 in the past 12 years. 854 01:06:22,250 --> 01:06:25,290 But anyway, I'd like to address the active living section 855 01:06:25,290 --> 01:06:28,810 of the plan specifically concerning the pedestrian 856 01:06:28,810 --> 01:06:31,930 and cyclist alternatives along Route 1. 857 01:06:31,930 --> 01:06:39,830 On page 8 of the draft plan, it states, due to high traffic volumes along U.S. route 858 01:06:39,830 --> 01:06:46,870 one itself, it may be appropriate to provide alternative routes for pedestrians and cyclists 859 01:06:46,870 --> 01:06:55,630 along parallel routes with lower traffic volumes such as telegraph road and old telegraph road. 860 01:06:55,630 --> 01:07:05,330 On page 4 of the Envision Hanover Topical Area Outreach Part 2 feedback summary in April and May, 861 01:07:05,850 --> 01:07:13,770 it states, there seems to be general support for providing pedestrian bicycle mobility within the suburban service area. 862 01:07:14,630 --> 01:07:21,150 Support for pedestrian bicycle mobility was not unanimous as a few participants expressed concerns 863 01:07:21,150 --> 01:07:26,770 with more people walking or biking by their homes or on roadways near their homes. 864 01:07:27,730 --> 01:07:31,250 I was one of those that expressed concern about Old Telegraph Road, 865 01:07:31,630 --> 01:07:38,210 because the north end of the road that connects that did connect to Route 1 is now closed. 866 01:07:38,930 --> 01:07:46,690 The map shows the walking path should be developed touching on Old Telegraph Road, 867 01:07:46,750 --> 01:07:50,430 which I'm not really sure what that means, but at any rate. 868 01:07:50,430 --> 01:07:53,850 There are no destinations on old telegraph road. 869 01:07:55,090 --> 01:07:58,690 The road, there's nothing for anybody to see or do. 870 01:07:59,830 --> 01:08:03,550 There's a steep hill, it floods, every time it rains. 871 01:08:05,430 --> 01:08:12,910 I just would like to suggest that old telegraph road be removed from the language in that. 872 01:08:13,290 --> 01:08:19,690 And to backtrack a little bit on a side note, I built in 2004. 873 01:08:20,490 --> 01:08:29,190 I think we have been coming to planning commission meetings since 2007. I don't know, but I know, 874 01:08:29,590 --> 01:08:31,070 since 2011, 875 01:08:34,270 --> 01:08:38,870 this is the community of Old Telegraph Road starting in 2011. 876 01:08:40,430 --> 01:08:42,110 I'm sorry. That's okay. Go ahead. 877 01:08:42,630 --> 01:08:42,950 30 seconds. 878 01:08:43,510 --> 01:08:44,130 Oh, I'm sorry. 879 01:08:44,210 --> 01:08:44,330 Okay. 880 01:08:44,650 --> 01:08:50,070 We have addressed Lake Ridge Common Suppartments, the closing of Old Telegraph Road, 881 01:08:50,070 --> 01:08:53,830 the rezoning of Old Telegraph Road, the North End. 882 01:08:54,210 --> 01:08:56,990 Lake Ridge Sports Complex, the wigwam strip mall, 883 01:08:57,170 --> 01:08:59,370 and venues, stony run condominiums, 884 01:09:00,010 --> 01:09:02,650 wisteria park development, the Powell property 885 01:09:02,650 --> 01:09:06,210 developments of style craft homes, the strip mall 886 01:09:06,210 --> 01:09:08,510 on route one of the Hopkins property 887 01:09:08,510 --> 01:09:12,170 that corner sliding hill, the warehouse behind Marvin Lane 888 01:09:12,170 --> 01:09:16,570 and Witch and Capital Warehouse in its because of language 889 01:09:17,490 --> 01:09:21,910 that is in compliance or whatever. 890 01:09:22,810 --> 01:09:26,470 So thank you very much and thanks for hearing me out. 891 01:09:26,770 --> 01:09:30,150 Hopefully it sparks the thought. 892 01:09:30,650 --> 01:09:31,110 Thank you. 893 01:09:31,110 --> 01:09:32,730 Thank you, Ms. Young. 894 01:09:32,930 --> 01:09:33,470 Next speaker. 895 01:09:36,430 --> 01:09:36,990 Yes, sir. 896 01:09:42,150 --> 01:09:43,030 Jasper Lewis. 897 01:09:43,450 --> 01:09:44,990 And I live on called Road. 898 01:09:46,170 --> 01:09:50,810 And my concern is that just to give you a little history. 899 01:09:51,670 --> 01:09:58,670 Some years ago, there was a blanket of rezoning and that land on that road was his own commercial. 900 01:09:59,770 --> 01:10:03,190 And it destroyed a almost entire community. 901 01:10:04,130 --> 01:10:07,990 And it made it impossible for people to keep homes there. 902 01:10:09,050 --> 01:10:11,230 And businesses moved in. 903 01:10:11,230 --> 01:10:16,690 And it was easy for them to do because if they bought somebody's house, it was already his own. 904 01:10:17,690 --> 01:10:19,370 It was a blanket of rezoning. 905 01:10:19,370 --> 01:10:27,150 Nobody knew about it, the community, the people weren't told, and it just broke the community up just about. 906 01:10:28,570 --> 01:10:34,530 But there are some homes still there, and it's a provision I understand in this, that 907 01:10:35,130 --> 01:10:42,410 would like to leave the commercial profit, not commercial, but the agricultural property in that 908 01:10:42,410 --> 01:10:49,830 section agricultural. And if that happens, then it would make it easier for the people 909 01:10:49,830 --> 01:10:57,190 who live that now to be able to have a community, which has been there for years. And when I 910 01:10:57,190 --> 01:11:07,410 say years, it goes back to the 1800s or longer. So I'm for the grand thing. 911 01:11:07,410 --> 01:11:09,050 What road is that you're talking about, sir? 912 01:11:09,190 --> 01:11:10,290 Cops, road. 913 01:11:11,250 --> 01:11:12,550 Cops, Cops, road. 914 01:11:13,110 --> 01:11:14,350 Right, well, we're waiting. 915 01:11:14,990 --> 01:11:15,570 Right, yeah. 916 01:11:16,050 --> 01:11:19,170 Yeah, like I said, that was done back in the 70s. 917 01:11:20,450 --> 01:11:20,670 And it, you know, 918 01:11:23,110 --> 01:11:23,730 all right, thank you, sir. 919 01:11:23,990 --> 01:11:24,290 Thank you. 920 01:11:24,410 --> 01:11:27,110 And you say, you're a favor of the plan, sir? 921 01:11:45,670 --> 01:11:45,930 You're welcome. 922 01:11:47,350 --> 01:11:48,450 Yeah, I'll see you. 923 01:11:56,940 --> 01:11:57,720 Yes, ma'am. 924 01:11:58,360 --> 01:11:59,120 You want to go next? 925 01:12:06,780 --> 01:12:08,940 I'm Hatsie, I'll say South Island District. 926 01:12:09,640 --> 01:12:16,740 First of all, I want to address the old telegraph bike path against it. 927 01:12:16,740 --> 01:12:25,660 I drove through there today, there are banks with driveways that drop anywhere from 10 to 15 feet on the south end of telegraph. 928 01:12:26,340 --> 01:12:32,980 There is a flood flooding around the bridge which you'd have to go over to connect to your path. 929 01:12:32,980 --> 01:12:48,820 And there's also a horrible wet land right at the O'Keeaton and Telegraph area that water comes flooding down into the backyard of the ground the other side of it and it goes into my yard. 930 01:12:49,160 --> 01:12:55,340 But anyway, I think it would be a big mistake to have an old telegraph of the part of the bike path. 931 01:12:55,340 --> 01:13:02,460 But tonight I have another subject, I want to address the traffic in the corridor between 932 01:13:02,460 --> 01:13:05,300 Ashland and Henrico County. 933 01:13:05,940 --> 01:13:13,520 I'm shocked at the fact of this list of focused corridors on the list of one accent here, 934 01:13:13,940 --> 01:13:21,380 and they don't consider it even near capacity or that it's entrance to key areas. 935 01:13:22,160 --> 01:13:23,920 That is a horrible area. 936 01:13:23,920 --> 01:13:30,000 And to make matters worse, every time somebody leaves my house, we tell them to be careful, 937 01:13:30,300 --> 01:13:30,580 pull it out. 938 01:13:30,660 --> 01:13:31,140 Be careful. 939 01:13:31,320 --> 01:13:32,800 It's very dangerous, very dangerous. 940 01:13:33,660 --> 01:13:41,060 And things are keeping an ad, and the Rex, on 95, are continually causing the traffic 941 01:13:41,060 --> 01:13:48,200 to be stopped on Route 1, either direction it can happen and you can't get out and the guy 942 01:13:48,860 --> 01:13:50,580 can't drive on Route 1. 943 01:13:50,580 --> 01:13:56,600 I would like to mention, if you go to Ashton Residence, here's some of the comments. 944 01:13:57,080 --> 01:14:02,440 95 backed up from Ashton, the Richmond again, lots of fire trucks and ambulances. 945 01:14:02,800 --> 01:14:05,300 That's why Route 1 was a congested nightmail. 946 01:14:05,840 --> 01:14:10,520 Route 1 is getting as bad as our 95, backed up through Ashton from Atley. 947 01:14:10,840 --> 01:14:14,900 January 6, does anyone know what is going on on our 95 and Route 1? 948 01:14:15,180 --> 01:14:19,780 Took 45 minutes to get from Atley, Elmont, to Louis Town, so sad. 949 01:14:19,780 --> 01:14:27,120 These are comments and we live it every day and there's nothing in this plan to address this issue and tell 950 01:14:27,120 --> 01:14:36,160 2000 and 45 and not only that we're going to be bombarded with, I'm sorry, I'm getting out of breath, I have heart 951 01:14:36,160 --> 01:14:36,960 problem. 952 01:14:37,940 --> 01:14:41,580 We've been bombarded with performance food, had any problems. 953 01:14:41,580 --> 01:14:49,600 Okay, and and wagments had had it is a fact in us Virginia Center athletic event opens this month. 954 01:14:50,160 --> 01:14:59,860 The hospital will be built a hundred and ninety apartments up on King Charlotte and you want employment center says it will be heavy truck and heavy traffic. 955 01:15:00,020 --> 01:15:07,340 And it just goes on and on, and there's nothing to address it. And that's my biggest complaint. Thank you. 956 01:15:11,850 --> 01:15:12,350 Next speaker. 957 01:15:23,460 --> 01:15:37,180 I good evening. My name is Harry Messina. I am an Ashland district and I didn't plan to speak, but I'm one of just to share some thoughts as a person who grew up here. 958 01:15:38,080 --> 01:15:44,400 And it was raised here in Hanover in the study area and brought her family back here 959 01:15:44,400 --> 01:15:49,700 nine years ago and is about to leave again because of all of this that we're talking about. 960 01:15:51,060 --> 01:15:57,360 So it's just really sad to me just to see that 700 people participated in this 961 01:15:57,360 --> 01:16:01,480 and vision hand over plan, but we have a hundred and nine thousand people in our county. 962 01:16:01,800 --> 01:16:08,860 So only 700 people were able to somehow get the news or attend or be able to leave their families 963 01:16:08,860 --> 01:16:17,140 in the evenings to go to the library to speak. I went to Atley High School with the brain storming 964 01:16:17,140 --> 01:16:21,780 session that was there originally. I did the survey online. I went to the Atley Library and spoke. 965 01:16:22,540 --> 01:16:26,060 I've shared multiple times about the need for a slow growth plan. 966 01:16:27,080 --> 01:16:30,700 I do not feel like this plan is ready to be approved, 967 01:16:31,320 --> 01:16:34,980 but yet I know that formality is going to happen, 968 01:16:35,660 --> 01:16:41,180 and so I'm just here to share that I think the pieces that are missing 969 01:16:41,180 --> 01:16:44,060 are having meetings per district. 970 01:16:44,300 --> 01:16:47,920 I would love to just have a focus on Ashland district. 971 01:16:48,300 --> 01:16:51,660 I'm sure the people of Cold Harbor would like to know exactly what they're 972 01:16:52,320 --> 01:16:59,660 changes are going to be, and visualizations are very powerful, so having overlays as to what the 973 01:17:00,900 --> 01:17:06,720 area geographic area looks like now and what it will look like in five years, ten years. 974 01:17:07,300 --> 01:17:11,700 What does it look like? Because there's a lot of wordage, and for me, I'm not a planner, 975 01:17:12,700 --> 01:17:20,720 but I would love to be able to see visually what all of these things happening simultaneously are going to look like. 976 01:17:21,520 --> 01:17:28,420 Also, just the Parks and Rec, as was spoken to, we have a lot of different groups that 977 01:17:28,420 --> 01:17:33,620 have tried to come and use our parks, use our school playgrounds, give our children alternatives, 978 01:17:34,020 --> 01:17:36,040 to screen time, and they've been denied. 979 01:17:36,180 --> 01:17:39,640 I've tried to get my son into I-9 sports at rule point at one point. 980 01:17:39,860 --> 01:17:40,720 They got denied. 981 01:17:41,460 --> 01:17:46,380 There's been, I know, an Ashland soccer group that's been trying to use poor form, park for 982 01:17:46,380 --> 01:17:48,560 their services, they get denied. 983 01:17:48,560 --> 01:18:01,920 We're sending all these people to Henrico for strikers and kickers and there's money there because people are eating in Henrico when they're taking their children to parks and wreck and athletics and other counties. 984 01:18:02,220 --> 01:18:15,520 So we really need to focus on our parks and wreck. I think there's a lot to be gained there. And also with the design and implementation, I don't think it just needs to be necessarily in the historically registered areas. 985 01:18:15,520 --> 01:18:21,340 it needs to be around in the suburban transition areas as well. 986 01:18:22,420 --> 01:18:24,380 So local color is very important to Hanover. 987 01:18:24,740 --> 01:18:25,880 Thank you. 988 01:18:25,960 --> 01:18:26,660 Thank you, man. 989 01:18:28,360 --> 01:18:29,760 I think we have one more speaker. 990 01:18:41,940 --> 01:18:43,040 Good evening, Chairman Bailey. 991 01:18:43,260 --> 01:18:44,380 The planning commissioners. 992 01:18:44,900 --> 01:18:47,760 Ms. Hunter and Ms. Randolph. 993 01:18:48,160 --> 01:18:50,000 I'd like first of all to thank you for your service. 994 01:18:50,400 --> 01:18:55,040 And I appreciate the willingness of the staff and the planning commission to listen to 995 01:18:55,040 --> 01:19:00,140 constituent input throughout this process. I think very important. There were a lot of meetings 996 01:19:00,920 --> 01:19:06,200 and I think people who did attend did get the opportunity to give their input. Nice 997 01:19:06,200 --> 01:19:12,240 certainly did. And I certainly understand that it's a balancing act where you're trying to 998 01:19:12,240 --> 01:19:18,540 balance the competing needs of various constituencies, developers, commercial businesses, residents, 999 01:19:19,200 --> 01:19:24,980 agricultural and sustainable bits. So it takes a lot and there's no such thing as perfect 1000 01:19:25,660 --> 01:19:35,600 And I support the plan, and I would encourage my friends and neighbors that do not, to not let the perfect be the enemy of the good. 1001 01:19:35,860 --> 01:19:38,260 I think good, this comes around every five years. 1002 01:19:39,480 --> 01:19:44,020 Five years from now, they'll be another opportunity to fix some of the things that maybe weren't perfect in this plan. 1003 01:19:44,540 --> 01:19:51,060 But I have some specific comments about some specific things that I've heard that I wanted to get across, 1004 01:19:51,060 --> 01:19:57,920 And some of these came from Mr. Pompays to do list from the Joint Planning Commission, 1005 01:19:58,520 --> 01:20:04,020 Kenny Board of Supervisors and Meeting. First of all, language clarifying the comp plan. 1006 01:20:06,000 --> 01:20:10,820 I would encourage you guys to speak with Ms. Randolph, perhaps you could expand upon this, 1007 01:20:10,960 --> 01:20:16,580 but it's my understanding that state law defines the purpose and the interplay of the comp plan and the zoning ordinance. 1008 01:20:16,580 --> 01:20:24,900 And I think any language to clarify the compound, which is further confused the issue because it would be just an additional overlay. 1009 01:20:26,100 --> 01:20:30,340 I support buffers and I support the width. 1010 01:20:31,860 --> 01:20:35,540 And there should be aspirational. I support the idea of leaving the space. 1011 01:20:35,740 --> 01:20:45,680 Even if the buffer is something down the road, when there's a use, we all know of areas where a buffer is impossible because there's no, there's just not any space. 1012 01:20:45,680 --> 01:20:52,120 So even if the buffer is a staged buffer, and we just leave the space for it, then a use comes in. 1013 01:20:52,820 --> 01:21:04,120 And we add that later, that's great. We need transitions between uses, transitions between offensive uses and residential uses are absolutely key. 1014 01:21:05,640 --> 01:21:11,260 And we need high standards. This should be aspirational. We should let this set atone. 1015 01:21:11,260 --> 01:21:13,160 It doesn't have to be perfect. 1016 01:21:13,320 --> 01:21:21,900 I mean, developers can seek relief from the comprehensive plan if they need to, for a project, otherwise good. 1017 01:21:23,080 --> 01:21:26,080 And I would ask you, leave Washington, Lacey Park alone. 1018 01:21:27,020 --> 01:21:30,580 We have two few parks as Mr. Nelson has pointed out any number of times. 1019 01:21:31,140 --> 01:21:32,380 Let's keep that one intact. 1020 01:21:32,700 --> 01:21:33,780 And thank you. 1021 01:21:34,620 --> 01:21:35,240 Thank you. 1022 01:21:35,540 --> 01:21:37,580 Anybody else, the wants to speak? 1023 01:21:37,920 --> 01:21:39,160 I think that's the 14. 1024 01:21:39,900 --> 01:21:42,220 Okay, that's all right, come on, ma'am. 1025 01:21:42,680 --> 01:21:43,540 We'll have one more speaker. 1026 01:21:47,600 --> 01:21:48,440 Thank you so much. 1027 01:21:48,660 --> 01:21:51,840 My name's Dorate Tae Henry, and I live in the mechanicsville district. 1028 01:21:52,040 --> 01:21:57,200 And I actually wasn't planning on speaking, but I don't think I heard anybody speak from the mechanicsville district. 1029 01:21:57,760 --> 01:22:00,560 So I've just wrote a few notes down, so bear with me. 1030 01:22:01,320 --> 01:22:02,420 And I'm also new to this process. 1031 01:22:02,420 --> 01:22:04,180 So thank you so much for all that you've done. 1032 01:22:04,740 --> 01:22:05,380 I'm learning as I go. 1033 01:22:05,540 --> 01:22:09,340 I have gone to some of the meetings, and I'm really appreciative of all the work that's been going into this. 1034 01:22:09,340 --> 01:22:10,880 But I do have some thoughts and some concerns. 1035 01:22:10,880 --> 01:22:15,040 I don't know if this is the right link to use, but I would ask, as somebody in the mechanics 1036 01:22:15,040 --> 01:22:20,080 will district, we've been living there for over 20 years, and we've absolutely loved living 1037 01:22:20,080 --> 01:22:20,660 in this county. 1038 01:22:20,740 --> 01:22:22,420 My husband was a Hanover deputy. 1039 01:22:22,740 --> 01:22:26,240 We've just really invested ourselves in this community, and for the first time, and probably 1040 01:22:26,240 --> 01:22:30,980 the last 20 years, over the past two, we're trying to build out our exit strategy. 1041 01:22:31,840 --> 01:22:39,880 The growth has been so fast, the lack of parks, the lack of walkability, the building, 1042 01:22:39,880 --> 01:22:46,900 lack of design and architectural standards has really harmed our quality life. 1043 01:22:47,920 --> 01:22:50,000 Anyhow, it's really harmed our quality of life. 1044 01:22:50,300 --> 01:22:54,880 And so I don't know if this is the right link we're going to use, but I would say I would support or ask to solidify 1045 01:22:54,880 --> 01:23:00,580 in any place whether it's in the conference of plan or in the ordinances, anything that increases our parks, 1046 01:23:01,100 --> 01:23:05,500 whether there are small pocket parks, but specifically in the old mechanicsful area for my children to go play 1047 01:23:05,500 --> 01:23:11,060 a part week to drive 30 minutes in traffic. Also increase anything that adds to walkability. 1048 01:23:11,540 --> 01:23:17,380 Sidewalks to shops, greenways, expanding bike paths on the side of roads, anything that increases 1049 01:23:17,380 --> 01:23:23,260 the walkability or the bike ability in the community. I also support the increase of buffers. 1050 01:23:23,600 --> 01:23:27,840 I think I've seen a hundred feet and then 50 feet, but anything that will absolutely just increase 1051 01:23:27,840 --> 01:23:31,980 that feeling of roll culture in downtown mechanics for the mechanics will district, 1052 01:23:31,980 --> 01:23:36,880 which is just growing so fast in every inch of space that's the size of a postage stamp 1053 01:23:36,880 --> 01:23:41,340 has a new development on it, so anything that increases those buffers and robust buffers, 1054 01:23:42,060 --> 01:23:48,560 trees, bushes, anything that can support that sort of visual aid to give that role feel. 1055 01:23:49,700 --> 01:23:54,360 Again, architectural standards, there's a specific property that's been recently built that does 1056 01:23:54,360 --> 01:24:00,020 not match the architectural standard that's really an eye sore, if you will, and so I would 1057 01:24:00,020 --> 01:24:01,960 to support anything that adds to that role feel. 1058 01:24:02,940 --> 01:24:07,860 If we're going to develop something that gives it a colonial or brick, or whatever 1059 01:24:07,860 --> 01:24:11,200 facade is agreed upon, that gives it that role architectural feel. 1060 01:24:11,240 --> 01:24:13,660 I would really support that and ask for that. 1061 01:24:13,700 --> 01:24:19,280 An example I would use is something that misses that mark is the blaze, cooling and heating 1062 01:24:19,280 --> 01:24:25,000 building that's on, goodness, it's on the lead Davis and Paul Green Road. 1063 01:24:26,120 --> 01:24:27,820 So that's something that I would say is a miss. 1064 01:24:28,980 --> 01:24:37,760 And then also downtown mechanics law. I saw that it's under a renew. I don't know if it's possible to look that up as maybe a historic district as well because I know there's some historic buildings there. 1065 01:24:38,060 --> 01:24:47,460 And I don't know all the designations and what that would imply, but I can tell you old mechanics will really have some beautiful things and some beautiful people living there and be great to put some investment into that space. 1066 01:24:48,720 --> 01:24:50,360 And that's it, thank you. 1067 01:24:50,440 --> 01:24:51,080 Thank you, ma 1068 01:24:54,120 --> 01:24:54,500 'am. 1069 01:24:54,720 --> 01:24:55,420 Okay, I'm all. 1070 01:24:55,580 --> 01:24:57,320 Did you want to speak, ma'am? 1071 01:24:58,080 --> 01:24:59,480 Okay, please make it real quick. 1072 01:24:59,740 --> 01:24:59,860 We're good. 1073 01:24:59,920 --> 01:25:02,140 We're at number 16 and we're on the 14 raise a hand. 1074 01:25:06,440 --> 01:25:07,100 Good evening. 1075 01:25:08,520 --> 01:25:10,480 My name is the LV and I'm the Ashland District. 1076 01:25:11,260 --> 01:25:11,620 Thank you. 1077 01:25:11,700 --> 01:25:14,680 Everyone for your hard work and all the staff and everyone. 1078 01:25:15,620 --> 01:25:17,760 I'm not speaking favor or against the plan to plan 1079 01:25:17,760 --> 01:25:19,140 to have a very positive improvements 1080 01:25:19,940 --> 01:25:21,340 and some things that are of concern. 1081 01:25:21,860 --> 01:25:26,220 The number one issue I see is that we all need to learn more about growth and development. 1082 01:25:27,340 --> 01:25:32,980 And it should be a combined effort of this commission staff, residents, and yes, even developers. 1083 01:25:34,340 --> 01:25:37,920 I moved here from in RICO because everything got out of control there. 1084 01:25:38,220 --> 01:25:40,780 And Hanover offered a better way of life in every aspect. 1085 01:25:41,300 --> 01:25:45,860 I don't want Hanover to become in RICO, but I also don't want the county to die out. 1086 01:25:46,820 --> 01:25:51,500 We have the suburban service area and that is designed to keep the county from becoming 1087 01:25:51,500 --> 01:25:57,180 in RICO, but that does come at a price of more density inside the suburban service area. 1088 01:25:58,080 --> 01:26:01,040 Another aspect that I cannot ignore is private property rights. 1089 01:26:01,460 --> 01:26:05,740 I can't stand here and consider myself a believer in our constitution and dismiss private 1090 01:26:05,740 --> 01:26:06,480 property rights. 1091 01:26:07,720 --> 01:26:11,720 I also don't want to see our economic development zones become warehouse distribution centers, 1092 01:26:12,320 --> 01:26:13,180 the likes of Wegmans. 1093 01:26:13,180 --> 01:26:18,920 We want to attract businesses, but we want to be clear about what kind of businesses. 1094 01:26:19,680 --> 01:26:24,780 And while I bring up Wegman's, I might point out the irony of the plans goal of reducing 1095 01:26:24,780 --> 01:26:27,700 light pollution, because there's plenty of that with Wegmans. 1096 01:26:29,100 --> 01:26:33,420 And I'll save you to the time, speaking about the solar policy later if you let me. 1097 01:26:34,360 --> 01:26:41,960 The solar policy, if the plan, the goal of this company has in plan is to reduce, to protect 1098 01:26:41,960 --> 01:26:47,140 the streams and the rivers and the natural habitat, allowing large-scale solar facilities 1099 01:26:47,140 --> 01:26:52,380 will destroy our farmland, our water sources and our natural habitat, and all we need to 1100 01:26:52,380 --> 01:26:56,960 do is look at Lisa and Spotsalvania to see the damage that's been done there. 1101 01:26:57,320 --> 01:27:03,420 Lastly, Sheets is not an appropriate, sheets is not appropriate to put across from someone's 1102 01:27:03,420 --> 01:27:05,860 backyard and right around the corner from school. 1103 01:27:06,040 --> 01:27:06,900 Thank you and God bless. 1104 01:27:07,440 --> 01:27:07,920 Thank you. 1105 01:27:08,740 --> 01:27:12,080 Okay, I'm going to close the public hearing at this time. 1106 01:27:15,980 --> 01:27:23,840 Mr. Pompeii, do you want to come up to the podium and I'll see what questions any of the 1107 01:27:23,840 --> 01:27:31,200 commissioners might have a comment first and then if you want, if nothing is, if everything 1108 01:27:31,200 --> 01:27:36,240 is not covered, if you want to address some of these others on this, is that okay with you? 1109 01:27:36,260 --> 01:27:37,100 Yes sir. 1110 01:27:37,980 --> 01:27:40,240 I'm going to sort of lead this off myself, 1111 01:27:42,920 --> 01:27:44,200 in your presentation, 1112 01:27:46,580 --> 01:27:48,320 you mentioned something about 1113 01:27:48,320 --> 01:27:54,300 a density bonus for workforce housing, can you expand on that a little bit? 1114 01:27:54,520 --> 01:27:55,560 Exactly, what does that mean? 1115 01:27:56,620 --> 01:28:03,200 So some localities offer greater density if there is a profit condition or some sort of guarantee 1116 01:28:03,200 --> 01:28:06,840 that workforce affordable housing is in the greater end to the project. 1117 01:28:06,840 --> 01:28:15,840 So for example, if the maximum density is 10 units an acre, they might allow our project to go up to 11 units an acre if there's some sort of guarantee that 1118 01:28:16,720 --> 01:28:19,300 workforce affordable housing is integrated into the projects. 1119 01:28:25,160 --> 01:28:29,120 One thing too, and I know we've talked about this before. 1120 01:28:30,100 --> 01:28:32,040 I had talked the Mr. Rogers today. 1121 01:28:32,600 --> 01:28:35,600 We've had numerous conversations over the last year or so. 1122 01:28:35,600 --> 01:28:41,840 We've got an email from him, and it's maybe some people here tonight that want us specifically 1123 01:28:41,840 --> 01:28:44,900 talking about the property there, three or one at a real point. 1124 01:28:45,680 --> 01:28:50,880 And I know his concern was making a change in that designation. 1125 01:28:53,040 --> 01:28:59,740 And I think this 100 had mentioned in the past something about the amount of land that's involved 1126 01:29:00,500 --> 01:29:04,740 there, well, and not that is really in complaint, even with the existing complaint. 1127 01:29:04,740 --> 01:29:09,600 But we already have mixed use coming on. I call it the self-west corner, the three or 1128 01:29:09,600 --> 01:29:15,580 one. This lady mentioned the sheets on the northwest corner, which we've got numerous 1129 01:29:15,580 --> 01:29:21,500 emails on that. And I think the issue they are specific to with the sheets is the number 1130 01:29:21,500 --> 01:29:28,220 pumps because the way it's so right now, by right sheets, can go there. It's mild sanding. So I mean, 1131 01:29:28,540 --> 01:29:32,780 the reason we're hearing anything on it is because the number of filling stations they want 1132 01:29:32,780 --> 01:29:34,000 of the fueling stations. 1133 01:29:35,020 --> 01:29:40,660 But can you talk a little bit about the area they had 301 and rule point in why we were making 1134 01:29:40,660 --> 01:29:41,220 that change? 1135 01:29:41,340 --> 01:29:46,680 Because I think there were six areas that you listed in the comp plan that was just one 1136 01:29:46,680 --> 01:29:47,300 of the six. 1137 01:29:47,800 --> 01:29:51,700 So we're not trying to pick on that piece of property because there are other properties 1138 01:29:51,700 --> 01:29:53,560 that we're changing as well. 1139 01:29:53,720 --> 01:29:58,040 But can you talk about that since that happens to be in my district and I've got numerous 1140 01:29:58,040 --> 01:29:59,600 comments on it. 1141 01:29:59,600 --> 01:29:59,900 Yeah. 1142 01:30:00,000 --> 01:30:06,020 And like I said, we did get an email and a phone call Mr. Rogers and I have a couple of conversations on that today. 1143 01:30:06,700 --> 01:30:14,640 Yes, sir. So there were six areas shown on the general land use plan, where there was not really this agreement or there was not agreement on the comments we received. 1144 01:30:15,120 --> 01:30:20,520 That intersection, U.S. Route 1, New Ashcake Road and Rule Point Road is one of those areas where there's different feedback. 1145 01:30:21,160 --> 01:30:27,440 Some people want more intensity, some want less intensity, and there is a recommendation on the table. 1146 01:30:27,440 --> 01:30:30,700 That's actually three districts that come together right there. 1147 01:30:30,800 --> 01:30:34,760 Check a homony, beaver dam in Henry, so there's different ideas and feedback. 1148 01:30:35,500 --> 01:30:41,740 Right now, in the comprehensive plan, the 2018 plan, three of the four corners, the northwest, 1149 01:30:41,920 --> 01:30:47,680 the southwest and the southeast are designated multi-use, and then that northeast corner 1150 01:30:47,680 --> 01:30:51,940 where that house sits close to the road that's designated commercial, and that's the edge 1151 01:30:51,940 --> 01:30:53,820 of the suburban service area. 1152 01:30:54,800 --> 01:31:00,860 The draft plan shows the Southwest corner as multi-use that remains the same because that 1153 01:31:00,860 --> 01:31:04,020 properties already zone under development for multi-use type development. 1154 01:31:05,880 --> 01:31:12,620 The Northwest corner where the sheets is proposed, and the current plan that's recommended 1155 01:31:12,620 --> 01:31:18,280 multi-use in the proposed change would designate it neighborhood commercial, which is the lowest 1156 01:31:18,280 --> 01:31:20,080 intensity of commercial use. 1157 01:31:20,080 --> 01:31:43,160 One challenge on that particular corner with that recommendation is neighborhood commercial the proposed land use designation is less intense than what the actual zoning is that property has been zone B2 since 1969 I believe in the neighborhood commercial recommends B1 type uses and does not recommend drive throughs or 24 hour businesses more small scale type uses. 1158 01:31:43,160 --> 01:31:48,860 So, again, that northwest corner is proposed to go from multi-use to neighbor who commercial in the land use designation. 1159 01:31:50,860 --> 01:31:59,220 The northeast corner where that house sits close to the road, that's commercial in the current plan, and that's proposed to go to neighborhood commercial again, that lower intensity use. 1160 01:32:00,840 --> 01:32:04,700 The southeast corner adjacent to Stag's leap in the church. 1161 01:32:05,260 --> 01:32:11,760 There's a strip in there that's on either side of the church and includes the church, and the current plan is designated multi-use. 1162 01:32:11,760 --> 01:32:17,260 multi-use recommends a project that's at least 20 acres, that's a master plan type project. 1163 01:32:18,020 --> 01:32:23,940 That area that's doesn't even multi-use in the current plan is not 20 acres and it's multiple small parcels. 1164 01:32:24,460 --> 01:32:28,460 So the recommendation that's been introduced since January is to have neighborhood commercial 1165 01:32:28,460 --> 01:32:35,800 at the corner and then where the church is and moving towards the creek is suburban neighborhood residential 1166 01:32:35,800 --> 01:32:37,640 one and a half to three units in acre. 1167 01:32:38,420 --> 01:32:41,820 the challenging feedback that we've received on that particular 1168 01:32:41,820 --> 01:32:47,120 south east corner where the church is some the property owners want to maintain 1169 01:32:47,120 --> 01:32:51,040 that multi-use designation some of the comments we received from different groups 1170 01:32:51,040 --> 01:32:54,800 they want the whole the whole side of that corridor to be residential so the 1171 01:32:54,800 --> 01:32:59,080 neighborhood commercial and residential designations kind of in the middle of all 1172 01:32:59,080 --> 01:33:02,420 the feedback we were receiving so that was introduced in January and that's been 1173 01:33:02,420 --> 01:33:06,200 remained remained the same but as you mentioned one one challenge with keeping 1174 01:33:06,200 --> 01:33:10,800 And that side of the road multi use is there's not 20 acres, it's multiple parcels, it's hard to create. 1175 01:33:11,200 --> 01:33:16,460 What's described in employment generating mixed use project with what exists there. 1176 01:33:18,060 --> 01:33:20,680 I'm just giving some bullet points here, okay. 1177 01:33:25,860 --> 01:33:29,940 I want to say that ladies name was Greenfield, the spoke. 1178 01:33:31,020 --> 01:33:32,200 There's a Greenfield in my correct. 1179 01:33:32,200 --> 01:33:40,240 Okay. She had mentioned something about the inventory that it appeared that we were consuming 1180 01:33:40,240 --> 01:33:46,300 more than I guess is getting approved. Do you know what the current inventory is in 1181 01:33:46,300 --> 01:33:52,400 the county as far as residential? Yeah. Lots that could be developed at this point. 1182 01:33:52,540 --> 01:33:56,100 So I don't know the exact number of the top of my head, but each year we track that as part 1183 01:33:56,100 --> 01:34:01,580 of our community development report. And right now it's just over 2,000 lots that are available 1184 01:34:01,580 --> 01:34:04,720 for residential construction countywide. 1185 01:34:04,960 --> 01:34:07,920 As Ms. Greenfield said, as we track that over the past 10 years, 1186 01:34:08,080 --> 01:34:10,620 we are consuming more lots than our, 1187 01:34:11,420 --> 01:34:13,960 so more building permits are being issued 1188 01:34:13,960 --> 01:34:15,700 than lots are being created. 1189 01:34:16,800 --> 01:34:19,360 So roughly, how many, I guess how many, 1190 01:34:19,440 --> 01:34:21,140 lots of being consumed each year? 1191 01:34:21,620 --> 01:34:22,300 I want to say that. 1192 01:34:22,300 --> 01:34:25,200 Assuming it's 2,000 will be the point 1193 01:34:25,200 --> 01:34:27,380 where it would be a zero, assuming, you know, 1194 01:34:28,120 --> 01:34:29,260 it varies from year to year, 1195 01:34:29,340 --> 01:34:30,680 and the building permits issued 1196 01:34:30,680 --> 01:34:35,540 has been going down this year, but last year, I believe we had about 600 building permits for 1197 01:34:35,540 --> 01:34:43,500 new residential units. So if we create no more lots and continue at 600 homes per year, 1198 01:34:43,740 --> 01:34:44,780 you know, that's four years. 1199 01:34:44,800 --> 01:34:52,780 But if you consume, if we had 600 requests and we got 2,000 an inventory, what about how many 1200 01:34:52,780 --> 01:35:02,100 requests, do we have more requests than the 2000, or do we start with 2000, had 3,000 requests 1201 01:35:02,100 --> 01:35:08,980 and we're issues 600, which mathematically dropped to them to 1700. 1202 01:35:09,040 --> 01:35:16,820 Yes, so the inventory each year, so say last year we started with 2500, we add the lots 1203 01:35:16,820 --> 01:35:21,940 that are plotted in the subdivision by-right, and then we, in the past year, and then we add 1204 01:35:21,940 --> 01:35:24,580 the lots that were re-zone in the past year, 1205 01:35:24,640 --> 01:35:26,000 and then we subtract out the building. 1206 01:35:27,260 --> 01:35:27,760 All right. 1207 01:35:28,120 --> 01:35:28,440 Carmen Bailey? 1208 01:35:29,060 --> 01:35:29,860 And I say something, please? 1209 01:35:30,000 --> 01:35:30,440 Yes, sir. 1210 01:35:30,620 --> 01:35:34,060 11 years ago, we had over 4,000 lots of inventory again. 1211 01:35:34,920 --> 01:35:35,080 Okay. 1212 01:35:39,000 --> 01:35:40,760 There were just a bullet points I wanted to head on. 1213 01:35:41,540 --> 01:35:43,540 And just for clarification purposes, 1214 01:35:44,700 --> 01:35:46,660 we'll go back with the comments from citizens. 1215 01:35:47,640 --> 01:35:48,940 Take a look at those comments. 1216 01:35:49,660 --> 01:35:52,340 I'm sure there will be some meeting with yourself. 1217 01:35:52,340 --> 01:36:03,380 I'm just honoured or something over the course of the next week and it may become back with some recommendations on any changes that we could do or send us an email on that. 1218 01:36:03,580 --> 01:36:04,900 Is that the process you'll go through? 1219 01:36:05,140 --> 01:36:10,140 Well, I think one thing we were hoping from you all is some of these outstanding issues to get some direction on. 1220 01:36:10,240 --> 01:36:14,560 So if you'll have collectively some consensus on some of these issues, you direct us to make changes. 1221 01:36:14,740 --> 01:36:22,320 And if there's something you want us to research, we can also research that and bring it back to ideas on some other issues that were brought tonight that we had an identified. 1222 01:36:24,440 --> 01:36:26,260 I'll be quiet for a while. 1223 01:36:26,760 --> 01:36:28,480 Let all the commissioners bring up their come. 1224 01:36:28,660 --> 01:36:29,340 It's a question. 1225 01:36:31,140 --> 01:36:32,980 I'm going to recognize Mr. Led by the first. 1226 01:36:33,340 --> 01:36:34,080 Thank you, Mr. Taylor. 1227 01:36:34,940 --> 01:36:40,880 Mr. Pompey on page 1415. 1228 01:36:41,700 --> 01:36:47,320 You captured in some wording and italics in the introduction section that 1229 01:36:47,320 --> 01:36:54,000 our buffers and the transition between uses. You kept it a lot of what we talked about, 1230 01:36:54,200 --> 01:37:00,580 but did you want to meet? And I think the wording is done very well. Especially on the buffers, 1231 01:37:00,680 --> 01:37:07,900 you give a little bit of flexibility to some wording that actually was a one-size-fits-all. 1232 01:37:08,220 --> 01:37:14,360 So I think that's a good thing. I'm in favor of that. I would like for you to add, if you would, 1233 01:37:14,360 --> 01:37:20,580 If everybody is in agreement to it, under the introduction section, the wording in the paragraph 1234 01:37:20,580 --> 01:37:29,180 in the talix, I expect to third line down this technical analysis and include the word 1235 01:37:29,180 --> 01:37:35,560 compatibility in there, because we talk about compatibility in pretty much every zone in case 1236 01:37:35,560 --> 01:37:36,160 we have. 1237 01:37:36,540 --> 01:37:42,620 I think that wording should be included in as well, and I also wanted to touch on the bicycle 1238 01:37:48,380 --> 01:37:53,700 I don't think telegraph road is a road that you should route a bicycle down. 1239 01:37:54,240 --> 01:38:00,620 I don't know, is that something we put in that was not already in the connecting between? 1240 01:38:02,360 --> 01:38:07,220 The 2018 plan doesn't show interconnection, so that is a new concept. 1241 01:38:07,220 --> 01:38:12,140 And one thing I want to note is those, those routes, they aren't saying that it's safe or 1242 01:38:12,140 --> 01:38:17,400 recommended to walk or bike today, what it's saying, or what's suggesting is, as development 1243 01:38:17,400 --> 01:38:21,460 occurs, we read your brief zoning requests, as funny comes available, as make road improvements. 1244 01:38:22,100 --> 01:38:26,440 Those are places where we could consider pedestrian bicycle infrastructure. 1245 01:38:27,260 --> 01:38:31,880 What I think telegraph erosion, but you're just taking off the map, if you entered it from 1246 01:38:31,880 --> 01:38:36,000 the North entrance, which is the only place it would be, you have no way to go. 1247 01:38:36,000 --> 01:38:39,980 you'd have to turn around and come back, there's nobody's going out in the right hand and 1248 01:38:39,980 --> 01:38:46,540 exit on right line. So I think that one should just be taken off the map. Do we have 1249 01:38:46,540 --> 01:38:52,420 any control over the major thoroughfair roles like Asyl Road? I mean, I know there's a 1250 01:38:52,420 --> 01:38:57,480 bicycle route, but that is one road that everybody puts their life in danger of riding a 1251 01:38:57,480 --> 01:38:58,280 bicycle down. 1252 01:38:59,360 --> 01:39:05,980 It's like the National Bike Routes, we have two National Bike Routes, you have a 1253 01:39:05,980 --> 01:39:12,940 We don't have any control over those. I guess we could talk to Vietot and see if there's an alternative route that could work 1254 01:39:13,840 --> 01:39:20,740 But yeah, those are I think this should be some consideration in what other we could do to address some of those roads 1255 01:39:27,690 --> 01:39:29,990 That's all I have terrible bailer right 1256 01:39:32,390 --> 01:39:32,710 now. 1257 01:39:35,230 --> 01:39:37,870 I'm going to reserve the right to come back again 1258 01:39:42,550 --> 01:39:53,570 Just going to piggybacking on Mr. Ledbetter on the page 14 for the suburban high-residential 1259 01:39:53,570 --> 01:40:02,730 370 disbreaker. Where is it going to be appropriate for us to make sure that if it 1260 01:40:02,730 --> 01:40:15,050 in MX development that businesses have to be built along with housing, where would that be appropriate, 1261 01:40:15,210 --> 01:40:17,610 maybe not here, but probably where. 1262 01:40:18,230 --> 01:40:22,910 In the land use designation, the description for the different land use 1263 01:40:22,910 --> 01:40:28,070 as nations that have MX or mixed use development recommended, there's some language in there that's 1264 01:40:28,070 --> 01:40:35,350 a phasing plan should be developed that ensures that residential or, sorry, commercial development 1265 01:40:35,350 --> 01:40:38,010 is built before or as residential development occurs. 1266 01:40:38,270 --> 01:40:42,310 So that's in those land use recommendations that the designation themselves. 1267 01:40:42,490 --> 01:40:51,830 I just want that to have a little bit of teeth because the couple MX uses we've seen, the business 1268 01:40:51,830 --> 01:40:55,010 side of it was always pushed out and I didn't like that. 1269 01:40:55,010 --> 01:41:05,770 The next thing I want to draw attention to is on page 15, and I think we've come up with some pretty good ideas about buffers, and I'm just going to weigh in on what I think about the buffers. 1270 01:41:07,090 --> 01:41:14,850 I think there's probably a way that we can get maybe with the density bonus. 1271 01:41:17,230 --> 01:41:20,170 You know, we give them a density bonus for they make bigger buffers. 1272 01:41:21,690 --> 01:41:29,730 If they put in berms, that could, that could shorten the buffer with. 1273 01:41:31,750 --> 01:41:34,030 I'm kind of with where Mr. Shia was. 1274 01:41:34,090 --> 01:41:39,010 I don't know. This is where we need it is in year. 1275 01:41:39,310 --> 01:41:40,890 But what do you think? What are your thoughts on that? 1276 01:41:40,950 --> 01:41:42,390 And I think one thing I wanted to clarify. 1277 01:41:42,470 --> 01:41:45,510 I think Mr. Ledbetter was referring to page 14 in the staff report, 1278 01:41:45,510 --> 01:41:51,590 where we have the draft language, we came up based on the concerns we heard with potential 1279 01:41:51,590 --> 01:41:56,590 language all could consider. So on page 14 the staff report, it has some potential 1280 01:41:56,590 --> 01:42:00,070 language that could be incorporated into different land use designations that doesn't necessarily 1281 01:42:00,070 --> 01:42:06,690 have widths, but has guidance on how buffers should look, be designed, and that kind of thing. 1282 01:42:06,830 --> 01:42:10,550 So, you know, it talks about having a mixture of dissiduous and evergreen trees, 1283 01:42:10,550 --> 01:42:17,030 these underserved trees and shrubs, maintaining existing vegetation where possible, in open 1284 01:42:17,030 --> 01:42:21,970 areas where their style of vegetation consider using berms, decorative fencing, those types 1285 01:42:21,970 --> 01:42:27,570 of things, narrow buffers might be appropriate if certain design features are incorporated. 1286 01:42:29,110 --> 01:42:35,860 So if you all collectively don't think it's appropriate to include widths, then there's 1287 01:42:35,860 --> 01:42:40,960 some language that it gets more to the quality of the buffer than the actual width of it. 1288 01:42:41,060 --> 01:42:42,400 What's your opinion on that? 1289 01:42:43,260 --> 01:42:45,720 Should we address the buffers in the ordinance? 1290 01:42:46,500 --> 01:42:54,800 Yeah, so the comprehensive plan is the policy advisory document that we use and usually what localities do is once we update the comprehensive plan, 1291 01:42:54,880 --> 01:42:58,460 we go look at our ordinances and see how they align or don't align and make updates. 1292 01:42:58,980 --> 01:43:03,860 So if buffers are an important concept, which I think based on public engagement they are, 1293 01:43:03,860 --> 01:43:07,840 We do need to include them in the comprehensive plan, the level of detail, you know, maybe 1294 01:43:07,840 --> 01:43:11,600 up for debate, but I think we want some good guidance on how these buffers should function 1295 01:43:11,600 --> 01:43:12,700 and look like. 1296 01:43:12,700 --> 01:43:15,860 So as we evaluate zoning cases, we know what to look for. 1297 01:43:15,920 --> 01:43:18,680 And as we look at our zoning ordinance and subdivision ordinance, we know what to look for. 1298 01:43:18,840 --> 01:43:23,200 So I think having some guidance on what buffers look like and what their purpose is is an 1299 01:43:23,200 --> 01:43:25,300 important part of the plan based on public feedback. 1300 01:43:25,520 --> 01:43:26,860 I agree with that. 1301 01:43:28,720 --> 01:43:33,480 Speaking of buffers again, I don't think that's, and we've got this, if the joint meeting, 1302 01:43:33,480 --> 01:43:35,800 And I think it's one size fits all. 1303 01:43:36,040 --> 01:43:38,800 I mean, if you've got a 100 acre development, 1304 01:43:40,120 --> 01:43:41,360 the buffers could be bigger. 1305 01:43:43,220 --> 01:43:47,920 If it's more industrial use and things like that, 1306 01:43:48,020 --> 01:43:49,760 and it depends on where it is, too, right? 1307 01:43:50,120 --> 01:43:58,020 We don't want to transition area going from urban to suburban to rural. 1308 01:43:58,360 --> 01:44:00,340 We want that transition to phase. 1309 01:44:00,340 --> 01:44:06,280 And I think that's where the buffers in my mind are really impactful, because you want 1310 01:44:06,280 --> 01:44:09,720 to keep that rural character going out. 1311 01:44:10,180 --> 01:44:17,120 And if there are some things, so I think I've given you more questions and I am answers 1312 01:44:17,120 --> 01:44:24,020 that I'm sorry about that, but in my mind, it should be, you know, with the transitional, 1313 01:44:24,020 --> 01:44:29,820 Well, they should be bigger buffers or more 1314 01:44:32,480 --> 01:44:35,620 dense buffers, so that could be burners. 1315 01:44:36,120 --> 01:44:38,580 And I think there's negotiation there. 1316 01:44:38,900 --> 01:44:42,100 If you put in this type of buffer, we could do this many feet. 1317 01:44:42,380 --> 01:44:45,880 If you know, I think there's room to improve on that. 1318 01:44:45,880 --> 01:44:50,880 And I don't know if it's in the comp plan that we do that or if it's in, but I think there's 1319 01:44:50,880 --> 01:44:57,180 way we can get to, and not perfect, 1320 01:44:59,240 --> 01:44:59,980 but Mr. Morgan said. 1321 01:45:00,000 --> 01:45:04,040 I'm not perfect, but good enough for now. But I don't think we're there with the buffer yet. 1322 01:45:07,420 --> 01:45:09,360 You stop. I'm not done yet. 1323 01:45:11,500 --> 01:45:12,200 Go ahead. 1324 01:45:16,160 --> 01:45:23,000 The other thing I want to address, too, when I forgot what page it's on, I'm getting a lot of feedback from 1325 01:45:23,000 --> 01:45:34,320 as soon as it ends about the wood side road and not of its good is there are we put the 1326 01:45:34,320 --> 01:45:42,280 car before the horse by putting that particular road in the comp plan I don't know that we 1327 01:45:42,280 --> 01:45:47,100 have a plan for it yet and if we put it in the comp plan that means we're going to develop something 1328 01:45:48,300 --> 01:46:08,440 The original idea behind that particular road and one of the reasons for having discussion about it is we do have the economic development zone, north of Woodside Lane, north of Washington, Lacey Park, that area has been designated for economic type development plan business since 2007. 1329 01:46:08,440 --> 01:46:15,660 So that route could be a potential route, that would allow traffic to get up to that economic 1330 01:46:15,660 --> 01:46:20,860 development zone without going by the existing residential subdivisions on wood side lane. 1331 01:46:21,540 --> 01:46:26,760 It's entirely, it would be entirely located on county property, because that is something 1332 01:46:26,760 --> 01:46:27,800 that county owns. 1333 01:46:28,820 --> 01:46:32,620 That means that we'd have to build it, generally those concept roads are built by developers 1334 01:46:32,620 --> 01:46:34,640 as they propose a development along the way. 1335 01:46:34,640 --> 01:46:40,260 they dedicate right away or they build and so that would be a project that the county 1336 01:46:40,260 --> 01:46:45,420 would have to build and it was an idea to try to get access again up to that economic 1337 01:46:45,420 --> 01:46:52,080 development area without impacting the residents. It may never be needed, it may never be 1338 01:46:52,080 --> 01:46:57,860 built but the proposal would be to have that as a potential option. 1339 01:46:57,860 --> 01:47:04,080 Well, isn't in our former plans, wasn't that the reason for what's I made? 1340 01:47:04,580 --> 01:47:07,660 This was to eventually extend to that economic development zone. 1341 01:47:07,720 --> 01:47:11,180 Yeah, from what I understand from the town and what the one planning 1342 01:47:11,180 --> 01:47:15,680 commissioner mentioned, that was the route to get up there when that economic 1343 01:47:15,680 --> 01:47:19,700 development area, plan business area was proposed in 2007. 1344 01:47:20,600 --> 01:47:26,960 And if that was to extend and I can't picture it in my mind right now with that, 1345 01:47:27,640 --> 01:47:34,840 from adjacent to the park, or would it run right through it, or it would run on the western 1346 01:47:34,840 --> 01:47:38,760 edge kind of where the parking area is, it would just, what's I would just go straight, 1347 01:47:39,320 --> 01:47:44,880 it kind of parallel the, there's like power lines, and that kind of, but it wouldn't necessarily 1348 01:47:44,880 --> 01:47:49,320 go straight down in the middle of the, what's I, what's I like sitting would go through the edge. 1349 01:47:49,360 --> 01:47:54,100 Now there's, there's another kind of road that goes to the right, and how that's designed 1350 01:47:54,100 --> 01:48:00,020 It's impacts would depend on how, it's, it's, in fact, the park would depend on how that road is designed, but 1351 01:48:00,020 --> 01:48:04,440 Woodside Lange on straight would just kind of be on the very western edge of the park. 1352 01:48:05,900 --> 01:48:10,980 So what impact do we have by leaving this Woodside Lange parallel road in the complaint? 1353 01:48:11,980 --> 01:48:13,940 What's the impact of what's not the impact? 1354 01:48:14,120 --> 01:48:19,840 So since that's on county property, it would just mean that if we had funding available, 1355 01:48:21,800 --> 01:48:26,100 the conference of playing with support, building that road, or if there was a project in that 1356 01:48:26,100 --> 01:48:34,720 area, we could ask for proffers to build that road. Right now there's no transportation funding, 1357 01:48:34,720 --> 01:48:40,480 we have committed for other projects and that kind of thing. So the impact is if funding comes available, 1358 01:48:40,640 --> 01:48:45,500 if there's a big zoning case in that area, that could proffer conditions, we could ask for that. 1359 01:48:45,500 --> 01:49:12,240 I am concerned about the route being taking here because, you know, we've got on the drawing board, we've got iron, we've got Mr. Rogers's development coming up, we've got more impact coming down that could really impact that little section of 54. 1360 01:49:12,240 --> 01:49:18,580 And if we put another road in there, are we just compounding our problems? 1361 01:49:19,940 --> 01:49:21,000 That's my big concern. 1362 01:49:21,360 --> 01:49:26,480 How do we get people out of the residential area, how do we get the stuff back there? 1363 01:49:26,820 --> 01:49:31,480 And I don't know that this road is the answer, but again, I'm getting you more questions 1364 01:49:31,480 --> 01:49:33,680 than I'm answering, I'm sorry about that. 1365 01:49:33,820 --> 01:49:39,580 But I don't know that this road is the answer, and I know we're not going to make everyone 1366 01:49:39,580 --> 01:49:40,040 happy. 1367 01:49:40,040 --> 01:49:47,760 But I am very concerned about all this development in that little area, it is not very big. 1368 01:49:48,880 --> 01:49:51,180 What that's going to do with the impact traffic. 1369 01:49:53,060 --> 01:49:56,280 Mr. Abbott, if I could clarify some of the comments about that road. 1370 01:49:58,120 --> 01:50:06,380 The road that would be proposed is the would line up if the Iron Horse project were to be developed. 1371 01:50:06,380 --> 01:50:28,320 That is a signalized intersection that's being proposed that the town has several proposals for if that iron horse project is to be developed to have numerous entrances along Route 54 and also they have recently changed their comprehensive plan to have residential development 1372 01:50:28,880 --> 01:50:32,040 which is proposing to use that road as well. 1373 01:50:33,360 --> 01:50:36,660 So there's a number of different things that are in play. 1374 01:50:37,280 --> 01:50:39,020 I just want to make sure you have the full picture. 1375 01:50:40,260 --> 01:50:44,800 Just mentioning that there was another somebody that 1376 01:50:44,800 --> 01:50:45,820 bring up to me. 1377 01:50:46,080 --> 01:50:48,440 If we did signalize my home and road, 1378 01:50:49,720 --> 01:50:55,440 what is the V dot standard where you can only have a light 1379 01:50:55,440 --> 01:51:01,680 That certain intervals on one road could go, could we put another light in here if we need it to? 1380 01:51:02,300 --> 01:51:04,900 So it's not at Mount Herman Road. 1381 01:51:06,120 --> 01:51:10,960 The traffic study for the iron horse development proposes that to be a signalized intersection. 1382 01:51:11,540 --> 01:51:18,460 If that intersection were to be approved, then it would prohibit any signalized intersection 1383 01:51:18,460 --> 01:51:21,360 at Woodside, which would be the major thoroughfare. 1384 01:51:22,020 --> 01:51:26,620 If that could, and I'm just talking off top of my head, 1385 01:51:27,280 --> 01:51:28,440 and I know there's probably not the time, 1386 01:51:28,580 --> 01:51:29,620 and I'll let you guys talk in a second. 1387 01:51:33,000 --> 01:51:35,940 If this parallel road could we put in something 1388 01:51:35,940 --> 01:51:37,400 like a roundabout there? 1389 01:51:38,460 --> 01:51:39,700 I mean, there's other options, 1390 01:51:40,540 --> 01:51:42,460 than just saying we can't do anything, right? 1391 01:51:44,370 --> 01:51:47,410 The spacing is very close between wood side 1392 01:51:47,410 --> 01:51:53,670 and the proposed location for the other road. 1393 01:51:54,610 --> 01:51:57,970 I don't think there would be spacing even for around about. 1394 01:51:58,390 --> 01:52:01,430 It could be looked at through engineering mechanisms, 1395 01:52:01,430 --> 01:52:03,490 but it is very close. 1396 01:52:05,950 --> 01:52:08,970 I guess I'm just not comfortable putting that road in there, 1397 01:52:09,250 --> 01:52:10,250 but that's just mine. 1398 01:52:10,430 --> 01:52:12,170 And I'll turn it back over to you. 1399 01:52:12,310 --> 01:52:13,750 Thank you, Mr. Trump. Thank you. 1400 01:52:16,710 --> 01:52:19,550 So I don't forget what I was wanting to say. 1401 01:52:20,650 --> 01:52:23,550 I got three things I wanted to mention right off the bat. 1402 01:52:23,870 --> 01:52:26,410 I wouldn't piggyback Mr. Abbott on the phasing aspect. 1403 01:52:26,490 --> 01:52:30,070 I know that DMX is referenced several times in the draft 1404 01:52:30,070 --> 01:52:34,010 comp plan in the various land use areas. 1405 01:52:35,750 --> 01:52:39,190 And it does say phasing there is a phasing, 1406 01:52:39,270 --> 01:52:41,590 but it doesn't go into any detail and I don't know if it's a 1407 01:52:41,590 --> 01:52:45,910 complain is the place for that. However, I also would like to see that beef 1408 01:52:45,910 --> 01:52:53,390 tough a little bit in that we have seen that push back and in fact I was 1409 01:52:53,390 --> 01:52:58,170 kind of surprised I didn't surprise that the 20 acres. I thought we had increased 1410 01:52:58,170 --> 01:53:04,450 the sizing of that a little bit but it may be maybe not. I still think that's a 1411 01:53:04,450 --> 01:53:10,170 little small for an MX situation and the thing is as I look around and look 1412 01:53:10,170 --> 01:53:19,330 up and down 301, I'm looking at subdivisions that are exist that had, they were not faced. 1413 01:53:19,790 --> 01:53:25,210 They have going to have office buildings or some type of buildings in the front of the subdivisions. 1414 01:53:25,490 --> 01:53:26,990 And nothing has been built yet. 1415 01:53:27,770 --> 01:53:34,710 And I want, I'm curious, what constitutes satisfying a phasing process, is it just putting 1416 01:53:34,710 --> 01:53:35,670 in a concrete pad? 1417 01:53:36,010 --> 01:53:37,830 Okay, now we can build more houses. 1418 01:53:37,830 --> 01:53:43,650 In other words, usually the phasing that I've seen is X number of homes are building permits 1419 01:53:43,650 --> 01:53:48,530 whatever the terms are used, allowed, and then it stops. 1420 01:53:49,850 --> 01:53:56,490 Then the commercial aspect has to have certain amount done, and then more building permits or 1421 01:53:56,490 --> 01:53:56,870 whatever. 1422 01:53:58,450 --> 01:54:04,090 I'd like to see, I don't know if the complaint is the place for that, but more than just 1423 01:54:04,090 --> 01:54:05,510 we're going to have a phasing process. 1424 01:54:06,390 --> 01:54:10,150 I'd like to see let's put some teeth into the facing aspect, 1425 01:54:12,160 --> 01:54:13,700 because I think we want I think 1426 01:54:13,700 --> 01:54:20,060 that that's what we're wanting to do and make sure of a commitment by the developer on 1427 01:54:20,060 --> 01:54:24,700 the commercial aspect of things and that because that's what was always the intent. 1428 01:54:24,980 --> 01:54:29,560 I mean let's face it, that's where some of the tax dollars comes to goes towards the county primarily 1429 01:54:29,560 --> 01:54:31,780 from commercial end-of-things. 1430 01:54:32,600 --> 01:54:38,380 So I think what you're imagining is having some sort of guidance, which might not be appropriate 1431 01:54:38,380 --> 01:54:42,880 in the conference of plan, but somewhere that says, if there's a mixed use project, 1432 01:54:43,240 --> 01:54:50,120 the appropriate ratio is X number of homes per Y square footage of commercial or industrial 1433 01:54:50,120 --> 01:54:50,600 spaces. 1434 01:54:50,600 --> 01:54:52,040 That can know what you're looking for. 1435 01:54:52,840 --> 01:54:57,020 I don't know if the conference of plan and maybe I don't want it in the conference 1436 01:54:57,020 --> 01:54:57,380 of plan. 1437 01:54:57,380 --> 01:55:03,360 I understand that. I mean, that's a three thousand foot level thing, but I think it's something 1438 01:55:03,360 --> 01:55:06,000 that needs to be up to support that complaint. 1439 01:55:09,180 --> 01:55:13,200 Well, that is something that has come up, you know, in zoning before zoning applications 1440 01:55:13,200 --> 01:55:21,320 where we've had phasing on on property side. Again, I'm not sure if the complaint is right 1441 01:55:21,320 --> 01:55:26,840 or but I do know we've had that come up in zoning requests before. 1442 01:55:26,840 --> 01:55:35,120 Yeah, a cold wall park that's under development has certain thresholds where a certain number of units can't be built until some business uses come online. 1443 01:55:35,280 --> 01:55:44,320 So we have it in previous cases and having this language in the conference of plans as we want a phasing plan, give us the tool to ask a developer, hey, this is something that's important to the county. 1444 01:55:45,580 --> 01:55:52,360 We need to work through this phasing plan that come up with something that's realistic and insurers that there's business uses coming online with the residential. 1445 01:55:53,660 --> 01:55:53,960 Okay. 1446 01:55:54,480 --> 01:55:55,720 That was my thought on that. 1447 01:55:55,720 --> 01:56:02,500 Also, I don't know if Ms. Hunter, you got a phone number, you do not have a phone number. 1448 01:56:02,600 --> 01:56:10,880 Ms. Raffordy is with the economic development section, and I tried to write as fast 1449 01:56:10,880 --> 01:56:14,480 I couldn't, I got to more focus, and then I couldn't follow any more. 1450 01:56:14,920 --> 01:56:20,220 So I would love to see what she had said, and I wouldn't mind getting a contact number. 1451 01:56:20,400 --> 01:56:24,720 I would like to contact her and find out if I can get a copy of what she was obviously 1452 01:56:24,720 --> 01:56:31,080 reading something and I think she has some ideas. I know the economic development is a very 1453 01:56:31,080 --> 01:56:35,760 important aspect and no Mr. Ledbetter and I've talked about that in a number of times for 1454 01:56:35,760 --> 01:56:39,940 this complaint. So I'd love to see what she has to say. That's just more of a comment. 1455 01:56:40,420 --> 01:56:45,540 But it's important because the last subject that ties in the Kennedy Economic Development 1456 01:56:45,540 --> 01:56:50,920 produces the tax dollars for us. That's the hopes so that the thing that has been mentioned 1457 01:56:50,920 --> 01:56:58,720 numerous times or parks. And I'm supportive of that. And I'm happy that to hear that we're 1458 01:56:58,720 --> 01:57:05,560 getting, they may be baby steps and getting the parks done, but or or addressed or at least 1459 01:57:05,560 --> 01:57:11,900 talked about. And one of the things, I don't know, this is more of a statement than anything else, 1460 01:57:11,960 --> 01:57:16,940 I've raised it twice, I know at least once. We need a mechanism where I know it's been raised 1461 01:57:16,940 --> 01:57:25,960 where citizens have voluntarily and have offered to donate property to the county. 1462 01:57:27,200 --> 01:57:30,460 I know it's been brought up over on the 54 area. 1463 01:57:31,020 --> 01:57:37,980 I know that it's been brought up in the Chikahomni district and what would have been because 1464 01:57:37,980 --> 01:57:42,980 it's in the suburban service area in a very small area, I would be considering it a pocket 1465 01:57:42,980 --> 01:57:43,400 park. 1466 01:57:43,740 --> 01:57:44,800 It was mentioned here tonight. 1467 01:57:44,800 --> 01:57:51,400 I mean we have to think I think in some areas that's the concept we've got to try to start getting a handle on. 1468 01:57:52,160 --> 01:57:58,880 It's not going to be a big huge park necessarily, but some small areas where particularly when somebody wants to donate property, 1469 01:57:59,580 --> 01:58:03,080 we have that mechanism and what needs to be done to pursue that. 1470 01:58:03,660 --> 01:58:06,820 So, because that has happened and that that individual said it to me personally. 1471 01:58:07,420 --> 01:58:11,800 And that's a couple of years ago and there was not a desire on the county to pursue it. 1472 01:58:22,240 --> 01:58:28,880 I wanted to, when we had the joint meeting, I brought up the complement and how we, if somebody 1473 01:58:28,880 --> 01:58:35,940 comes up for a complement amendment, how we broadcast that, is this in the complement? 1474 01:58:36,900 --> 01:58:45,260 I think that we should not give a nod like there's going to be enhanced, notifying if you 1475 01:58:45,260 --> 01:58:47,660 if you want to see P.A. 1476 01:58:49,100 --> 01:58:56,500 We could possibly add something on page six, the last paragraph of the introduction chapter talks about the many in the comprehensive plan. 1477 01:58:57,020 --> 01:59:02,760 We could add some general language in here that talks about how we do public outreach. 1478 01:59:03,000 --> 01:59:06,420 That would ultimately be something we would incorporate to our ordinance or outreach policies, 1479 01:59:07,020 --> 01:59:10,000 but there could be something in there that talks about. 1480 01:59:11,570 --> 01:59:21,470 I just feel like, like, a compound amendment impacts more people than just the people who live around that particular property. 1481 01:59:21,630 --> 01:59:27,110 I think it needs to be wider, a wider net to be cast. 1482 01:59:28,370 --> 01:59:30,190 So, all right, I'm done now. 1483 01:59:30,190 --> 01:59:37,170 But you're not referring specifically to the verbiage where it says that amendments are 1484 01:59:37,570 --> 01:59:38,650 can be submitted. 1485 01:59:38,810 --> 01:59:45,690 You're saying more people being notified of the request or you can't compliment them. 1486 01:59:46,150 --> 01:59:59,970 If you're asking for a complaint amendment, you have to tell more people, other than the 1487 02:00:00,000 --> 02:00:08,680 Okay. All right. Other comments? Mr. Vortico. Thank you Chairman Davis. Mr. Abbott. 1488 02:00:11,320 --> 02:00:28,660 One thing I want to echo with Mr. Hager said here, I've worked with a couple several years ago, and they wanted to donate a third echo in old mechanics field for a pocket part. In the time, we couldn't get a feet on a ground with it. 1489 02:00:28,660 --> 02:00:34,140 But if we could get something worked out I'd be more happy to go back to these people they still might be wanting to do it 1490 02:00:34,140 --> 02:00:37,080 And some perfect place for it. They keep it manicured 1491 02:00:37,080 --> 02:00:42,140 If you had a couple of wings that said to answer some sand boxes, it'd be a good place to have right in old 1492 02:00:42,580 --> 02:00:45,180 Cancels. So that next thing I want to talk about 1493 02:00:46,000 --> 02:00:51,220 Has everybody knows I'm not in favor of the 100 foot buffer in the suburban service, all right? 1494 02:00:51,740 --> 02:00:53,620 And I'm gonna tell you y'all have done a wonderful job 1495 02:00:54,620 --> 02:00:56,840 writing this up you have 1496 02:00:58,660 --> 02:01:06,100 But I still see where, you know, it's not really in concrete that you, you know, 1497 02:01:06,260 --> 02:01:08,580 that you still could have a hundred foot buffer there. 1498 02:01:09,300 --> 02:01:16,040 I like all these stuff about the trees, the bushes, and everything to, you know, 1499 02:01:16,140 --> 02:01:17,940 you can do that with a 50 foot buffer. 1500 02:01:18,120 --> 02:01:25,740 Owners of urban service are you side only, not to, on the side, but I could see maybe 1501 02:01:25,740 --> 02:01:30,660 a wider buff in that if you give them the developer some credit with some 1502 02:01:31,500 --> 02:01:36,380 audacity to help offset that cost because it's cost to him a lot more money 1503 02:01:36,960 --> 02:01:43,210 to do that and that's my two cents and I know we'll talk about it again later 1504 02:01:43,210 --> 02:01:47,270 but you know I like everything I'll do and I see what you put a lot of time 1505 02:01:47,270 --> 02:01:53,870 and if you did you listen to what we had to say and that's what all I got to say 1506 02:01:53,870 --> 02:01:59,670 So are you suggesting that they change the buffer from 100 or to a lot more guns? 1507 02:02:00,530 --> 02:02:04,190 Because I mean, I think what he's looking for is some specific language that they're going 1508 02:02:04,190 --> 02:02:06,030 to put into the final drive. 1509 02:02:06,950 --> 02:02:10,250 Well, the old says 50 feet, you know, we're talking about 100. 1510 02:02:10,350 --> 02:02:18,270 I'm not in favor of 100, and Mr. Peterson is not in favor of 100, but the wording now talks 1511 02:02:18,270 --> 02:02:26,750 about all the berms, the trees, you know, everything else that goes with it is really nice. 1512 02:02:26,850 --> 02:02:31,050 Landscape and coffers, berms like Mr. Abbott keeps bringing up. 1513 02:02:31,150 --> 02:02:32,110 I think things are a great idea. 1514 02:02:32,470 --> 02:02:35,430 If you do that, I think 50 foot would be okay. 1515 02:02:35,570 --> 02:02:39,790 In the suburban service area only, but I'm not a favor of 100 foot. 1516 02:02:40,110 --> 02:02:45,530 Because right back to what I say, when we talk about workforce housing, we keep getting 1517 02:02:45,530 --> 02:02:51,510 away from it, not closer to it, and when you go another 50 foot, you just raise that bar up 1518 02:02:51,510 --> 02:02:58,290 here, and you can get to it now, so you keep raising your never get to it. And I'm just 1519 02:02:58,290 --> 02:03:07,470 not in favor of anything over 50 foot, I'm not cornering. I just wear a state. Sorry. Mr. Lebo. Yeah, 1520 02:03:07,930 --> 02:03:13,650 going back to Mr. Wood, because I think a lot of that was captured on page 14 when the revised 1521 02:03:13,650 --> 02:03:19,570 wording. So I think some of that's there. And I want echo what Mr. Hadris said too. I had 1522 02:03:19,570 --> 02:03:27,370 some people come up to me doing some of the comp-lam meetings that had properties that 1523 02:03:27,370 --> 02:03:32,190 they wanted to donate. And some of them were pretty sizable tracks. So I think that 1524 02:03:32,190 --> 02:03:37,670 really should be pursued. That may be some leeway there to give something to them. 1525 02:03:40,000 --> 02:03:47,560 When you're referencing page 14, we've got two, four things in this staff analysis, only the actual 1526 02:03:47,560 --> 02:03:50,500 contract in the staff report. 1527 02:03:51,480 --> 02:03:56,940 And I really think talking to a couple of people, there's a very good tax advantage to that. 1528 02:03:57,220 --> 02:04:04,380 But people donating property to a county in federal and state taxes, it's a very good tax advantage 1529 02:04:04,380 --> 02:04:05,180 from the do it. 1530 02:04:05,220 --> 02:04:07,080 Hopefully we can get it going. 1531 02:04:07,080 --> 02:04:11,960 I think Mr. Ledbear and I were together when one of those conversations took place. 1532 02:04:12,340 --> 02:04:16,080 But I was just like to make one more statement too. 1533 02:04:17,200 --> 02:04:23,600 Our transportation situation is a problem on every project just about it. 1534 02:04:24,180 --> 02:04:27,800 And I just want everybody to realize our rows of control by V dot. 1535 02:04:27,960 --> 02:04:30,440 We have to go through V dot to make any kind of improvements. 1536 02:04:31,700 --> 02:04:34,220 And we're still driving down rows of a creative process. 1537 02:04:34,860 --> 02:04:41,120 So we've got a long ways to go and it's going to be our appeal battle, but I think we're 1538 02:04:41,120 --> 02:04:46,440 doing the best we can, we have to be careful with traffic on all these rezoning cases 1539 02:04:46,440 --> 02:04:52,340 and I think we've done that in the recent future, I just wanted to make that statement. 1540 02:04:53,580 --> 02:04:54,440 Can I say one thing? 1541 02:04:55,240 --> 02:04:55,720 Public comments, please. 1542 02:04:55,720 --> 02:04:57,340 Yes, ma'am. 1543 02:04:57,440 --> 02:04:59,460 Public public comments, please. 1544 02:05:00,220 --> 02:05:03,860 Mr. Woodaker, did you want to make some suggestion or something less than 100? 1545 02:05:04,640 --> 02:05:11,220 I would like 50 feet with all the berms, trees and all that that. 1546 02:05:11,580 --> 02:05:15,580 What I'd like to say, we're talking about the road systems, I'll just bring this up. 1547 02:05:15,840 --> 02:05:17,880 We get a lot of calls from a lot of people. 1548 02:05:19,320 --> 02:05:24,380 They were surface-treaten erodes around the Caxfield a few years ago. 1549 02:05:24,860 --> 02:05:30,180 I don't know how many people I'd have called me, ringing my ear off, surface-treaten. 1550 02:05:30,740 --> 02:05:36,200 This year we're getting their granted and payment them all, they don't like that either. 1551 02:05:37,320 --> 02:05:42,020 They just don't like it, you know, we can't get out of a driveway, and you're getting 1552 02:05:42,020 --> 02:05:42,780 nice roads. 1553 02:05:43,040 --> 02:05:46,520 I mean, they're coming through doing a lot of work on that roads, which I appreciate. 1554 02:05:48,400 --> 02:05:50,480 But that's, you know, you hear things like that. 1555 02:05:51,260 --> 02:05:58,400 If we change at his suggestion to buffering the SSA to 50 feet, does that impact 1556 02:05:59,620 --> 02:06:05,780 All the buffers, those are just, just with an SSI. 1557 02:06:05,880 --> 02:06:10,540 It would just be in the SSI. The way the leaners and nations are divided up, we could just 1558 02:06:10,540 --> 02:06:18,780 do that in the SSI. So just for my clarity, do you want us to change the width of 50, incorporate 1559 02:06:18,780 --> 02:06:24,060 the language and the draft report or do a combination? Is there a consensus on that? 1560 02:06:25,930 --> 02:06:27,290 I'd like to see a change of 50. 1561 02:06:29,210 --> 02:06:33,330 It's the love out of you ever in the comments on the 50 or you don't play well. 1562 02:06:33,750 --> 02:06:39,980 I like some of the flexibility because I don't know that every project is the same. 1563 02:06:41,940 --> 02:06:46,540 If there's any way we could word it so that we could capture that, I think that would be good. 1564 02:06:46,600 --> 02:06:51,340 And I could go off that too because we know not one size fits all. 1565 02:06:51,880 --> 02:06:54,560 And if you could come up with something mandatory, it'd be nice. 1566 02:06:54,560 --> 02:06:57,280 So blend the 50 with the language. 1567 02:06:57,300 --> 02:06:58,960 I think that would be the best way to do it. 1568 02:07:00,300 --> 02:07:06,400 Mr. Chairman, isn't that that garbage on that's attached in our report? 1569 02:07:07,060 --> 02:07:08,900 That is, does it allow that flexibility? 1570 02:07:09,260 --> 02:07:15,080 Yeah, that does not have a recommended width, so we could just have that or we could say 1571 02:07:15,080 --> 02:07:19,900 something like, thoroughfare buffers should generally be, 1572 02:07:28,940 --> 02:07:28,940 within the Suburban Service 1573 02:07:28,940 --> 02:07:30,780 or something to do with magic. 1574 02:07:32,900 --> 02:07:32,980 Yes. 1575 02:07:32,980 --> 02:07:33,460 Mr. Chairman? 1576 02:07:34,520 --> 02:07:34,640 I did. 1577 02:07:35,160 --> 02:07:35,600 Since the public. 1578 02:07:35,920 --> 02:07:36,040 Yes. 1579 02:07:36,160 --> 02:07:36,660 Thank you, sir. 1580 02:07:36,760 --> 02:07:37,820 Since the office of topic, 1581 02:07:38,440 --> 02:07:40,980 if the object of the exercise is visibility, 1582 02:07:42,000 --> 02:07:44,740 then if we have to put a footage on there, 1583 02:07:44,940 --> 02:07:46,980 I think 50 is reasonable, 1584 02:07:47,580 --> 02:07:49,400 but if that could be reviewed, 1585 02:07:49,720 --> 02:07:51,400 and say, you know, maybe 50 is not needed 1586 02:07:51,400 --> 02:07:55,120 because of the existing trees or whatever is there, 1587 02:07:55,960 --> 02:07:56,640 I think flexibility. 1588 02:07:56,640 --> 02:07:58,860 I would very much like that in the wording. 1589 02:08:00,060 --> 02:08:03,680 All we're going to have to give these developing my opinion is we've got to give these 1590 02:08:03,680 --> 02:08:08,360 developers higher density to putting those areas if we're taking land away from them. 1591 02:08:08,520 --> 02:08:10,800 So that's I just want to chime in on that. 1592 02:08:11,220 --> 02:08:17,140 I think you've given it pretty good flexibility to capture most of what the concerns were in my opinion. 1593 02:08:18,140 --> 02:08:25,420 You know we want to leave the natural buffers as much as possible too and that allows that to happen as well. 1594 02:08:25,420 --> 02:08:32,600 we don't want to, we don't want to cut down with two or three is and then plant six foot tall trees in some situations. 1595 02:08:34,950 --> 02:08:35,730 Mr. Abbott. 1596 02:08:35,990 --> 02:08:37,570 Yeah, I want to weigh in as a buffer thing. 1597 02:08:39,970 --> 02:08:45,630 I think the flexibility is that I'm not an agreement with the 50 foot buffer. 1598 02:08:46,530 --> 02:08:47,890 I just straight across the board. 1599 02:08:48,130 --> 02:08:50,930 I think there needs to be a lot of discussion between that. 1600 02:08:51,510 --> 02:08:53,810 There's some 50 foot buffers that work. 1601 02:08:54,290 --> 02:08:56,190 It depends on the scale of the development, right? 1602 02:08:56,190 --> 02:09:05,930 If you get, if you got a 50-foot building, a 25-foot or a 55-foot buffer doesn't do anything. 1603 02:09:08,430 --> 02:09:15,710 So, it has to be with that eye shadow, so I'm not in favor of putting a 50-foot just a number on it, 1604 02:09:15,950 --> 02:09:22,210 because I think it's going to have to be flexible depending on the development. 1605 02:09:26,760 --> 02:09:35,800 Right there they're saying 100 what if it's you give them a leeway fifty to a hundred that's the term in I guess at 1606 02:09:37,020 --> 02:09:39,080 Time of slight plan or 1607 02:09:39,080 --> 02:09:45,920 You we could have I can take all your feedback and try to come up with something but we could say generally buffers are fifty to 1608 02:09:46,700 --> 02:09:50,760 X number of feet based on site specific conditions the proposed use 1609 02:09:52,000 --> 02:09:55,080 Fifty to a hundred feet something that is that more variable to you 1610 02:09:56,700 --> 02:10:02,420 I think if we're going to do that, if we're going to do that, then it's going to have 1611 02:10:02,420 --> 02:10:06,160 to be the scale of development too. We're going to have some coverage in there as well. 1612 02:10:06,440 --> 02:10:10,760 I mean, if you're talking about, you know, two story townhouses, 50 feet might be fine. 1613 02:10:11,220 --> 02:10:15,100 But if you're talking about an industrial complex, 50 foot is not going to work. 1614 02:10:15,740 --> 02:10:20,340 But some flexibility, though, that, like Mr. Ward at this thing, that some flexibility 1615 02:10:20,340 --> 02:10:22,280 that permits something to less than 100. 1616 02:10:22,820 --> 02:10:23,100 Yes. 1617 02:10:23,740 --> 02:10:24,980 I'm agreeing with that. 1618 02:10:25,440 --> 02:10:26,380 Depending on the scale. 1619 02:10:26,620 --> 02:10:27,220 Other comments? 1620 02:10:28,320 --> 02:10:30,280 I'd like to see it. 1621 02:10:30,540 --> 02:10:31,500 Some questions today. 1622 02:10:31,840 --> 02:10:35,020 They're saying real cross the board. 1623 02:10:35,280 --> 02:10:37,860 100 feet or 50 feet. 1624 02:10:38,100 --> 02:10:38,980 Some sort of flexibility. 1625 02:10:40,000 --> 02:10:41,420 So I think we're all in a grim attire. 1626 02:10:45,740 --> 02:10:48,260 I guess we need to give some direction on this. 1627 02:10:48,480 --> 02:10:50,720 It's a wood side parallel road. 1628 02:10:51,020 --> 02:10:52,220 Then we'll just call. 1629 02:10:53,280 --> 02:10:55,900 in any other thoughts of the Mr. Abbott? 1630 02:10:56,420 --> 02:10:57,000 What's that? 1631 02:10:57,660 --> 02:10:57,820 No. 1632 02:10:59,860 --> 02:11:00,780 You haven't thoughts on that? 1633 02:11:04,430 --> 02:11:04,810 No one? 1634 02:11:07,010 --> 02:11:07,730 Leave it as this? 1635 02:11:09,430 --> 02:11:12,230 I mean, we need, that is just a concept road anyway, correct? 1636 02:11:12,550 --> 02:11:14,890 I mean, it's sort of like you and I had talked about. 1637 02:11:16,130 --> 02:11:16,490 Yes. 1638 02:11:16,530 --> 02:11:16,630 Yes. 1639 02:11:16,630 --> 02:11:19,310 She's like I don't want to go out for the Crayon Road Parkway extension. 1640 02:11:19,490 --> 02:11:22,430 I mean, that's been in the company since 1996. 1641 02:11:22,930 --> 02:11:29,450 And who knows, if it would not be developed, because you've got environmental studies, 1642 02:11:29,810 --> 02:11:34,610 community input, you've got wetlands, you go across, you've got a funding, and we're 1643 02:11:34,610 --> 02:11:39,630 talking probably decades down the road before that, but even a number of fruition, even 1644 02:11:39,630 --> 02:11:41,670 there's been a comprehensive in 1996. 1645 02:11:42,370 --> 02:11:42,930 That's correct. 1646 02:11:43,030 --> 02:11:45,530 And that's just one of several other roads in the county. 1647 02:11:45,990 --> 02:11:49,870 So that doesn't mean that that road is definitely going to be there. 1648 02:11:50,470 --> 02:11:51,030 That's correct. 1649 02:11:52,910 --> 02:11:57,510 It could be there, there's some language for that particular roadway since it's an unusual 1650 02:11:57,510 --> 02:12:02,290 situation in that it's county owned property within the town limits, there's language 1651 02:12:02,290 --> 02:12:08,570 about coordinating with the town, should that road undergo design or engineering or progress 1652 02:12:08,570 --> 02:12:10,810 farther than a line on the map. 1653 02:12:15,160 --> 02:12:21,340 So, anybody else having to comment on that particular road, I mean I understand where you're 1654 02:12:21,340 --> 02:12:26,520 I'm sort of okay with it knowing that it's not something that we're going to do to 1655 02:12:26,520 --> 02:12:27,540 immediately anyway. 1656 02:12:29,940 --> 02:12:36,440 I guess we only comment to that would be if there is somebody that wants to develop that 1657 02:12:36,440 --> 02:12:41,320 economic area then it could be going to happen really quick and we've got a lot of development 1658 02:12:41,320 --> 02:12:48,660 going on around there and I don't know that we have a plan to accommodate all of the 1659 02:12:48,660 --> 02:12:50,300 what's going on in an area. 1660 02:12:52,930 --> 02:12:59,610 Well, I think once we vote on this thing next week, if we have it in there, or out of there, 1661 02:12:59,610 --> 02:13:02,970 I mean, it's still going to be up to the more supervisors, that's the law, and I think 1662 02:13:02,970 --> 02:13:05,950 we want to put it down and take it out, something we could take it out and they could put 1663 02:13:05,950 --> 02:13:08,070 it back in, or we could leave it in and they could take it out. 1664 02:13:09,210 --> 02:13:09,370 That's correct. 1665 02:13:10,950 --> 02:13:11,510 All right. 1666 02:13:11,790 --> 02:13:13,210 Commissal, anything else? 1667 02:13:14,210 --> 02:13:14,250 Yes. 1668 02:13:14,290 --> 02:13:17,950 The one thing I want, I think the gentleman has loved. 1669 02:13:18,870 --> 02:13:20,670 I didn't get this last name, I know, was Jasper. 1670 02:13:21,230 --> 02:13:24,030 But, you know, he mentioned something about where he lived. 1671 02:13:24,850 --> 02:13:25,990 It was agriculture for Martin. 1672 02:13:26,170 --> 02:13:31,350 I want to check that, because I mean, I'm not familiar with the company in his specific area, 1673 02:13:31,970 --> 02:13:36,670 because he's of the opinion that where he is, is agriculture and is going to stay that way. 1674 02:13:36,990 --> 02:13:37,450 I'll give you familiar with that. 1675 02:13:37,450 --> 02:13:39,510 Yeah, I can speak to that situation. 1676 02:13:40,290 --> 02:13:46,170 So, where he is, he's on a Cobb's road, just east of Stoning Run. 1677 02:13:46,170 --> 02:13:55,070 And that portion of Cobb's road was resumed to industrial in the 1970s without community involvement as he suggested. 1678 02:13:55,570 --> 02:13:58,350 There is a proposed change to the map in that area. 1679 02:13:59,190 --> 02:14:04,130 So there are some houses that remain along Cobb's road including his home. 1680 02:14:04,490 --> 02:14:11,370 We're changing the map from mixed use and business industrial to suburban neighborhood residential where those houses are. 1681 02:14:11,470 --> 02:14:15,470 So the land use designation is changing from a business designation to a residential designation. 1682 02:14:15,470 --> 02:14:23,390 And then there's a strategy in the implementation section about working with that community to 1683 02:14:23,390 --> 02:14:30,350 downzone the remaining residential properties to a residential district to address that issue since 1684 02:14:30,350 --> 02:14:33,910 base to live there and they weren't involved in that process 50 years ago. 1685 02:14:34,510 --> 02:14:39,430 So, his particular issue is specifically mentioned in the comprehensive plan and changes made. 1686 02:14:39,430 --> 02:14:44,750 So, it's not, well, the properties, it's, it's not agricultural, but the lean 1687 02:14:44,750 --> 02:14:46,810 United States nation is recommending residential. 1688 02:14:47,330 --> 02:14:50,770 But the commercial part is, is what you're saying is coming out. 1689 02:14:51,230 --> 02:14:58,770 Yeah, so the, yeah, where there are existing houses along that corridor, where the 1690 02:14:58,770 --> 02:14:59,970 lean United States nation will change to residential. 1691 02:15:04,960 --> 02:15:26,880 That was a good move because we had a lot of controversy on that. We actually had a homeowner that owned a home, but because it was own commercial, they couldn't get loan for it. That helped that took care of that situation. And there's several, there's right many residential homes down through that area. 1692 02:15:26,880 --> 02:15:29,140 Yeah, I want to make sure we covered that. 1693 02:15:30,280 --> 02:15:33,760 The last of coming, and I have, I'm sorry. 1694 02:15:33,940 --> 02:15:37,810 I'm going to tell you what that is. 1695 02:15:37,810 --> 02:15:38,290 Yes, ma'am. 1696 02:15:42,600 --> 02:15:45,220 OK, OK, I've worked with the proposal. 1697 02:15:46,080 --> 02:15:46,740 Yeah, OK. 1698 02:15:48,300 --> 02:15:52,320 Mr. Shia wrote up a comment, and I just want to sort of 1699 02:15:52,320 --> 02:15:55,640 further this food for thought, do we need to go back? 1700 02:15:55,980 --> 02:15:58,180 You know, several of us have been on the commission here 1701 02:15:58,180 --> 02:15:59,680 for a number of years, and we've always 1702 02:15:59,680 --> 02:16:03,860 that the comp plan was really just like sort of a guiding document. 1703 02:16:04,120 --> 02:16:09,960 So it's really sort of like an advisory thing, the number of other mitigating factors 1704 02:16:09,960 --> 02:16:15,820 that can come into play, that's the following not a zoning request that's approved by us, 1705 02:16:15,840 --> 02:16:20,040 all the board of supervise, just because it's, I'm just going to say, purple on the map. 1706 02:16:20,360 --> 02:16:24,540 Then that sort of means that they're going to get everything that they want within a purple dot. 1707 02:16:26,020 --> 02:16:31,220 Do we need to make sure that throughout the document is says advisory versus policy? 1708 02:16:32,940 --> 02:16:37,520 I don't know if Ms. Hunter has thoughts on this, but it is a policy guide. 1709 02:16:38,680 --> 02:16:43,160 There is some specific policy in there like we're not going to expand utilities outside the suburban 1710 02:16:43,160 --> 02:16:43,740 service area. 1711 02:16:43,920 --> 02:16:45,960 That is a policy that's in the comfort to plan. 1712 02:16:46,040 --> 02:16:47,880 I don't think that exists anywhere else. 1713 02:16:49,680 --> 02:16:51,040 A policy is not law. 1714 02:16:51,040 --> 02:16:55,780 that's just so i think policy advisory i don't think there's much difference i don't know 1715 02:16:55,780 --> 02:17:00,220 i mean i'm just going to notice yeah for conversation i mean if you all think it's okay the way it is 1716 02:17:00,900 --> 02:17:06,680 but uh yeah i apologize he's not law that's just how we conduct business in the 1717 02:17:06,680 --> 02:17:13,240 Congress of plan is an advisory okay i don't know if it's right off has anything to add on that or 1718 02:17:16,180 --> 02:17:23,620 regardless of what the complaint says uh the Virginia code uh says that a comprehensive plan 1719 02:17:23,620 --> 02:17:31,600 is an advisory document, you know, for the purpose of guiding and accomplishing development, 1720 02:17:32,020 --> 02:17:37,580 it's general in nature. So nothing we can say in the in the comp plan is going to change 1721 02:17:37,580 --> 02:17:41,220 what the Virginia code says the comp plan does. Okay, 1722 02:17:44,560 --> 02:17:51,300 anything else in the body wants to 1723 02:17:51,300 --> 02:17:54,960 question, and then I'd like to ask Mr. Pompey and possibly Ms. Hunter. 1724 02:17:55,880 --> 02:18:01,580 You mentioned in our report, we talked about there were some things outstanding issues 1725 02:18:01,580 --> 02:18:02,640 in one of the items. 1726 02:18:03,240 --> 02:18:07,300 It was General Land, he was planned, happens to be the neighborhood commercial. 1727 02:18:08,080 --> 02:18:12,440 Do we need to take an action on that or just basically go along with that and I'm talking 1728 02:18:12,440 --> 02:18:15,040 over at the Metabridge Road Shady Grove area? 1729 02:18:16,360 --> 02:18:18,860 And there are plans for over there. 1730 02:18:18,860 --> 02:18:25,120 There's been a neighborhood community meeting they are definitely I attended that and they're in favor of that. 1731 02:18:25,400 --> 02:18:33,540 So because it's listed in here as a outstanding issue, is that something we still need to at least acknowledge that we want to do that? 1732 02:18:35,120 --> 02:18:42,620 Yes, I think as you make the motion when you decide to take your vote on the comprehensive plan, that should be one of the items at that time. 1733 02:18:42,940 --> 02:18:43,200 Yes, sir. 1734 02:18:43,200 --> 02:18:43,900 Okay. 1735 02:18:45,720 --> 02:18:47,880 Anything else on the comp update? 1736 02:18:48,280 --> 02:18:49,560 If not, thank you very much, sir. 1737 02:18:50,060 --> 02:18:52,040 Thank you. 1738 02:18:52,820 --> 02:18:56,420 Make those few changes, and then we will, as a commission, 1739 02:18:56,560 --> 02:18:58,400 pick air vote on the next week. 1740 02:18:58,940 --> 02:19:01,820 So we're going to move it here to the service manager policy. 1741 02:19:02,340 --> 02:19:04,360 Can I repeat back what you would like to say? 1742 02:19:04,360 --> 02:19:04,840 Yes, sir. 1743 02:19:06,080 --> 02:19:09,140 For the buffers, come up with something that kind of blends 1744 02:19:09,140 --> 02:19:16,880 the width flexibility with the language we included in the staff report, and then modify the 1745 02:19:16,880 --> 02:19:20,720 map to add that neighborhood commercial in the southeast corner of Medabridge Road and 1746 02:19:20,720 --> 02:19:25,900 Shady Grove to the business, and that's what we'll work on and make those changes for next 1747 02:19:25,900 --> 02:19:26,800 time. 1748 02:19:28,280 --> 02:19:28,840 Okay. 1749 02:19:29,260 --> 02:19:36,920 And I think we're also going to add language regarding the comp plan advertisement guidance. 1750 02:19:50,410 --> 02:19:58,050 If there's consensus to take old-tail graph road off, y'all can tell me that. 1751 02:20:01,070 --> 02:20:02,250 I'm okay with that. 1752 02:20:05,830 --> 02:20:05,950 All right. 1753 02:20:06,170 --> 02:20:07,830 We'll make the work on this for change. 1754 02:20:07,930 --> 02:20:10,670 I'll close off in a certain hurry anyway. 1755 02:20:10,670 --> 02:20:12,210 That's great because I'm in it. 1756 02:20:12,370 --> 02:20:14,370 Yeah, but you can get out on old key, right? 1757 02:20:14,550 --> 02:20:16,230 Which has a dangerous road too. 1758 02:20:17,070 --> 02:20:18,630 One other change is that we will look 1759 02:20:18,630 --> 02:20:21,650 at the suburban center, mixed use section, 1760 02:20:22,050 --> 02:20:25,490 and look at this language for phasing as well. 1761 02:20:25,690 --> 02:20:26,230 Thank you. 1762 02:20:26,610 --> 02:20:27,250 Yes, thank you. 1763 02:20:27,510 --> 02:20:27,850 Thank you. 1764 02:20:28,210 --> 02:20:31,430 All right, let's move ahead to the soul and energy policy. 1765 02:20:33,750 --> 02:20:35,490 And I think this honor is going to be. 1766 02:20:35,510 --> 02:20:40,090 If you do want to say that you're deferring your decision, 1767 02:20:40,090 --> 02:20:41,750 And you're closing this next week. 1768 02:20:42,150 --> 02:20:46,810 Yeah, if you're going to close the public hearing, I think we should have a vote from the commission 1769 02:20:46,810 --> 02:20:53,090 that they would be deferring the decision until August 17th. 1770 02:20:54,250 --> 02:20:55,470 All right. 1771 02:20:55,470 --> 02:20:56,650 So if I want to make that motion. 1772 02:20:57,770 --> 02:20:58,390 Mr. Abbott. 1773 02:20:59,490 --> 02:20:59,970 Second. 1774 02:21:00,590 --> 02:21:00,970 Second. 1775 02:21:01,830 --> 02:21:02,550 I'll second. 1776 02:21:02,890 --> 02:21:04,770 We're going to defer action on it until the 17th. 1777 02:21:04,830 --> 02:21:05,890 All my favor say aye. 1778 02:21:06,690 --> 02:21:06,970 Aye. 1779 02:21:06,970 --> 02:21:13,370 I would defer to the 1st of the 17th that I would recommend meeting. 1780 02:21:13,750 --> 02:21:13,930 Okay. 1781 02:21:14,490 --> 02:21:19,150 Then we're ready for the solar presentation. 1782 02:21:31,670 --> 02:21:33,190 Good evening members of the Planning Commission. 1783 02:21:33,310 --> 02:21:36,090 Joanne Hunter, Director of Community Development and Planning. 1784 02:21:36,930 --> 02:21:41,110 We presented the solar energy policy to the Planning Commission 1785 02:21:41,650 --> 02:21:46,410 at our last meeting and there were some changes in different items 1786 02:21:46,410 --> 02:21:49,810 that the Planning Commission asked us to take a look at. 1787 02:21:49,950 --> 02:21:51,890 I'm going to try to do the presentation. 1788 02:21:52,250 --> 02:21:55,930 It's much more scale-down version of what you saw last time. 1789 02:21:56,490 --> 02:22:01,170 However, all the changes that we have made or any of the questions that have come up 1790 02:22:01,170 --> 02:22:03,830 since the last meeting are going to be shown in red. 1791 02:22:04,590 --> 02:22:09,290 So this solar policy, the purpose is to provide guiding document 1792 02:22:09,290 --> 02:22:13,290 for the location of solar and energy facilities. 1793 02:22:13,290 --> 02:22:19,310 There are four different types of these facilities, the accessory, which is primarily what 1794 02:22:19,310 --> 02:22:22,070 you see at local homes and businesses. 1795 02:22:22,810 --> 02:22:28,710 We did add some clarifying language of how much kilowattage or megawatts are allowed with 1796 02:22:28,710 --> 02:22:30,010 each of these types of uses. 1797 02:22:30,570 --> 02:22:32,730 That would be limited to 25 kilowatts. 1798 02:22:33,170 --> 02:22:35,270 We had the solar energy supplementary. 1799 02:22:35,890 --> 02:22:39,050 That would be limited to two kilowatts of energy. 1800 02:22:39,050 --> 02:22:47,230 And then the solar energy facility, the wholesale one, would be by those of the larger ones, 1801 02:22:48,130 --> 02:22:52,550 generally the small scale, less than five megawatts, and larger scale utility scale, 1802 02:22:52,990 --> 02:22:54,730 and then their battery energy and storage. 1803 02:22:55,290 --> 02:23:00,050 So again, the first one is what you would typically think of as what you see on people's 1804 02:23:00,750 --> 02:23:04,370 residential businesses, roofs, or ground mounted. 1805 02:23:04,370 --> 02:23:08,690 And the state code does require these to be by use by right use. 1806 02:23:09,370 --> 02:23:16,770 We did add that the clarify that the roof mount was 12 inches at maximum tilt, and these 1807 02:23:16,770 --> 02:23:19,870 would be allowed in all zoning districts by right. 1808 02:23:21,090 --> 02:23:27,830 The supplemental one, this would be up to two megawatts and canonic seed, 10% of property 1809 02:23:27,830 --> 02:23:28,910 or more than 10 acres. 1810 02:23:28,910 --> 02:23:34,550 These are allowed in commercial industrial districts and also on farms. 1811 02:23:35,610 --> 02:23:41,330 These are, you see in some locations, like if you've seen the Sauer Center in downtown Richmond, 1812 02:23:41,810 --> 02:23:46,210 they have the solar panels in the parking lot that actually provide shade for the cars. 1813 02:23:46,730 --> 02:23:51,350 These would be these types of uses or if you see a lot of farms. 1814 02:23:51,710 --> 02:23:57,190 And now we were in one that Charlottesville that it was a winery and it was completely solar operated 1815 02:23:57,190 --> 02:24:01,010 through the solar panels that just served their property. 1816 02:24:01,570 --> 02:24:04,130 And it does allow some to go back to the grid as well. 1817 02:24:04,750 --> 02:24:06,670 We did add some language in there, 1818 02:24:06,670 --> 02:24:08,690 which came up from the Planning Commission 1819 02:24:08,690 --> 02:24:13,790 that this would be if they wanted to have it either higher than 12 feet. 1820 02:24:13,810 --> 02:24:16,950 If it's ground mounted or 12 inches on the roof mounted, 1821 02:24:17,070 --> 02:24:19,330 that they could apply for a special exception. 1822 02:24:19,470 --> 02:24:22,510 And I think that was a concern raised by one of the Planning Commissioners. 1823 02:24:23,290 --> 02:24:26,510 The next area is what people consider solar farms. 1824 02:24:26,510 --> 02:24:33,070 Those are where the principle use of the property is to generate solar electricity. 1825 02:24:33,910 --> 02:24:41,730 There were three different categories before utility scale, community scale and small scale. 1826 02:24:42,590 --> 02:24:50,250 Taking a look at it, there was concerns raised by people from the state that we shouldn't use the term community scale, 1827 02:24:50,250 --> 02:24:55,490 because that could be confused with some other language that is used in the solar 1828 02:24:55,490 --> 02:24:56,050 industry. 1829 02:24:56,630 --> 02:25:00,530 And then that taking a look at it, we saw that the standards were the same for the 1830 02:25:00,530 --> 02:25:02,850 community scale and the utility scale. 1831 02:25:03,190 --> 02:25:08,090 So we've just narrowed it down to two categories, utility scale, which would be five 1832 02:25:08,090 --> 02:25:09,210 megawatts or greater. 1833 02:25:10,210 --> 02:25:13,710 And then the small scale, which is five megawatts or less. 1834 02:25:16,330 --> 02:25:18,290 Could you go back to that screen? 1835 02:25:19,110 --> 02:25:22,890 I thought it should be greater than 20 meter watts. 1836 02:25:23,710 --> 02:25:28,910 So it used to be the community scale, which was between 5 and 20. 1837 02:25:29,830 --> 02:25:32,690 And we've combined it now just to two categories. 1838 02:25:33,090 --> 02:25:37,630 We could consider keeping that community scale and changing the name of it if the commission 1839 02:25:37,630 --> 02:25:44,150 like that, but the standards were the same for both the community scale and the UTLD scale. 1840 02:25:49,130 --> 02:25:54,470 Based on some of the comments that we had received from our citizens, under the citing 1841 02:25:54,470 --> 02:26:03,370 locations, we did add that the areas could be considered throughout the county except for 1842 02:26:03,370 --> 02:26:11,390 which previously had been in their areas designated for commercial and industrial uses in the 1843 02:26:11,390 --> 02:26:17,390 and natural conservation areas, and also agricultural and forestal districts, and those 1844 02:26:17,390 --> 02:26:20,110 were made to the small scale as well. 1845 02:26:21,850 --> 02:26:27,750 We did add these additional evaluation considerations based on the citizen comments that we 1846 02:26:27,750 --> 02:26:34,350 got, that when you're evaluating these facilities, that facilities that are currently 1847 02:26:34,350 --> 02:26:41,330 forced it are discouraged for soul facilities and an adjacency to scenic roads, federal and 1848 02:26:41,330 --> 02:26:46,450 county parks, national registered historic districts are discouraged without additional mitigation 1849 02:26:46,450 --> 02:26:52,430 measures to address impacts. So those were added to our evaluation criteria as we were 1850 02:26:52,430 --> 02:26:58,870 reviewing locations through the conditionally used permit process. There was a standard in there 1851 02:26:58,870 --> 02:27:06,630 that it was a 100-foot setback from a property line and a 150-feet if there was an occupied 1852 02:27:06,630 --> 02:27:07,510 home. 1853 02:27:07,510 --> 02:27:15,730 I think we received concerns that it shouldn't be whether a home is not or not, so it was 1854 02:27:15,730 --> 02:27:21,910 changed to 150 from property line, regardless of whether it's next to an existing home or 1855 02:27:21,910 --> 02:27:22,610 not. 1856 02:27:22,610 --> 02:27:29,630 Um, clarified that it's 100 foot set back from RPA wetlands and streams and 50 feet for all other wetlands. 1857 02:27:30,070 --> 02:27:33,210 Um, there is a 100 foot landscape buffer requirement. 1858 02:27:34,010 --> 02:27:36,150 The height is limited to 20 feet. 1859 02:27:36,730 --> 02:27:39,570 Um, and then underground utilities was talked about. 1860 02:27:39,650 --> 02:27:40,950 This is any new lines. 1861 02:27:41,710 --> 02:27:47,310 Um, added that financial considerations should not be the sole reason for not placing the lines underground, 1862 02:27:47,570 --> 02:27:49,950 which was a recommendation by the planning commission. 1863 02:27:49,950 --> 02:27:58,110 These also have design standards for utility and small scale facilities, which would require security 1864 02:27:58,110 --> 02:28:01,850 fencing, lighting, which would be full cut off. 1865 02:28:02,250 --> 02:28:07,550 The land disturbance would be limited to 100 acres at a time with requirement of a supervision 1866 02:28:07,550 --> 02:28:10,450 of a third party at all times. 1867 02:28:11,190 --> 02:28:17,250 Facing plan would be required if the property was going to be developed in fasing, and then 1868 02:28:17,250 --> 02:28:23,570 some detailed information on decommissioning and removal of these projects after their natural 1869 02:28:24,250 --> 02:28:29,530 life, which would include bonding for all the costs to do that. 1870 02:28:29,590 --> 02:28:35,730 We developed some environmental considerations for the solar facilities to avoid disturbance 1871 02:28:35,730 --> 02:28:41,570 of resource protection areas, wetlands and floodplains, protect the repairing buffers, 1872 02:28:41,570 --> 02:28:46,930 to prepare a threatened and endangered species screen from the Department of Wildlife 1873 02:28:46,930 --> 02:28:52,470 Service and then special consideration to be given when adjacent to cultural and 1874 02:28:52,470 --> 02:28:53,770 historic resources. 1875 02:28:55,690 --> 02:28:58,750 This is for battery energy storage. 1876 02:28:59,130 --> 02:29:04,330 We do already allow these in the county that was an ordinance that was approved in late 1877 02:29:04,330 --> 02:29:10,550 2022 and they may be considered only in the agricultural and industrial districts. 1878 02:29:10,550 --> 02:29:17,530 the policy requires they avoid residentially-zoned areas to minimize the disturbance on 1879 02:29:17,530 --> 02:29:22,830 prime agricultural soils and cultural resources, and then there's information on 1880 02:29:22,830 --> 02:29:30,430 setbacks, buffers, public safety and training for our fire and MS officers, and then 1881 02:29:30,430 --> 02:29:35,910 also decommissioning as well. There are some financial considerations related to these 1882 02:29:35,910 --> 02:29:43,390 types of uses. We have determined that we would be using the machinery and tools tax to tax 1883 02:29:43,390 --> 02:29:49,410 these uses. There are two different options that a locality could use that would be a revenue 1884 02:29:49,410 --> 02:29:57,770 share which would allow you to charge up to $1,400 per megawatt. However, we took a look at 1885 02:29:57,770 --> 02:29:59,730 an existing project within the county. 1886 02:30:00,000 --> 02:30:05,500 And determined that the machinery and tools tax was financially favorable to the county. 1887 02:30:06,780 --> 02:30:18,160 The larger utility scale projects, which are greater than five megawatts, can also provide a one time financial payment to the county. 1888 02:30:18,640 --> 02:30:27,260 The reasoning for the payment is identified in the state code and it's pretty broad language that anything within our budget. 1889 02:30:27,260 --> 02:30:31,160 It could be used for broadband various different things. 1890 02:30:31,480 --> 02:30:38,460 We did a pretty detailed analysis and formula to determine what that per megawatt cost should 1891 02:30:38,460 --> 02:30:44,540 be and with the focus on broadband and public safety. 1892 02:30:45,320 --> 02:30:55,240 So we have determined the fee would be $23,430 per megawatt, so if we came in with a 10 megawatt 1893 02:30:55,240 --> 02:31:01,720 facility we would work with the developer of this facility to prepare a 1894 02:31:01,720 --> 02:31:11,120 sighting agreement and that would be $230,000 that would go as a one-time 1895 02:31:11,120 --> 02:31:16,560 payment. They would be required sighting agreements are required for all these 1896 02:31:16,560 --> 02:31:20,860 facilities that are greater than five megawatts. We would want them to meet with 1897 02:31:20,860 --> 02:31:28,120 the county and at least have a drafting agreement in place prior to the public hearing that these 1898 02:31:28,120 --> 02:31:33,320 uses would require conditional use permit and then they would be ultimately approved by the 1899 02:31:33,320 --> 02:31:38,660 Board of Supervisors at the same time as the conditionally used permit. The funding with the 1900 02:31:38,660 --> 02:31:47,600 for the permit megawatt fee would be a starting point. We also also put in the policy that if there 1901 02:31:47,600 --> 02:31:54,480 other capital projects that are nearby the facility where the facility is be located that 1902 02:31:54,480 --> 02:32:02,620 they should also be considered as potential additional payment for locating near those facilities. 1903 02:32:03,480 --> 02:32:10,160 The megawatt fee would be analyzed every three years and would be subject to a yearly increase. 1904 02:32:11,340 --> 02:32:16,580 The outstanding issues that I think they were down to about four of them that we would 1905 02:32:16,580 --> 02:32:26,160 I'd like to get clarification on, and these were all one that the Planning Commission has shared their comments with us since the last one, which was the purpose of the deferral. 1906 02:32:27,200 --> 02:32:44,300 So I think the major question is right now, all of the utility facilities, which is the small, which is up to five megawatts, and the five megawatts are greater, 1907 02:32:44,300 --> 02:32:52,260 are allowed anywhere in the county, does the planning commission feel that only the small ones, 1908 02:32:52,360 --> 02:32:58,200 five megawatts, or less, should be allowed in the SSA, or is it appropriate to have the 1909 02:32:58,200 --> 02:33:04,220 larger facilities, which could be several hundred acres be allowed in this urban service area. 1910 02:33:04,220 --> 02:33:09,360 So that's a key decision point that we'd like to get direction from the planning commission. 1911 02:33:09,360 --> 02:33:16,940 And the second decision point was there was concern raised that right now the policy says 1912 02:33:16,940 --> 02:33:20,500 that the no facility can be larger than 1,000 acres. 1913 02:33:21,640 --> 02:33:26,620 Some planning commission members have felt that that was too large so we would like some 1914 02:33:26,620 --> 02:33:29,500 clarification and decision points on that. 1915 02:33:31,280 --> 02:33:39,340 Previous policy that had gone to the community development committee and to the Board of 1916 02:33:39,340 --> 02:33:43,520 have specific language in there stating that you couldn't 1917 02:33:43,520 --> 02:33:46,000 cluster the facilities and there had to be a distant 1918 02:33:46,000 --> 02:33:49,140 separation of three miles between those facilities. 1919 02:33:50,140 --> 02:33:52,480 When the community development committee, which is 1920 02:33:52,480 --> 02:33:55,820 subcommittee of the Board of Supervisors, reviewed the 1921 02:33:55,820 --> 02:34:00,620 policy, they felt like that there was the three miles 1922 02:34:00,620 --> 02:34:04,500 was arbitrary that there's no basis on where we came up 1923 02:34:04,500 --> 02:34:08,220 with that three miles and that they felt that there 1924 02:34:08,220 --> 02:34:13,880 should be some flexibility on a case by case basis to allow to review it. 1925 02:34:13,880 --> 02:34:19,320 It is a conditionally-use permit, so if there's too many in the area, the planning commission 1926 02:34:19,320 --> 02:34:25,160 in board would have that opportunity to not approve that conditionally-use permit, but they 1927 02:34:25,160 --> 02:34:27,800 wanted to have that flexibility in the policy. 1928 02:34:28,500 --> 02:34:34,980 And the last one is the land disturbance being limited to no more than 100 acres at a time 1929 02:34:34,980 --> 02:34:38,300 with full stabilization prior to a new section. 1930 02:34:39,060 --> 02:34:42,300 There has been in-ask concerns with these facilities 1931 02:34:42,940 --> 02:34:43,960 in the past. 1932 02:34:44,260 --> 02:34:47,320 The county does require through this policy 1933 02:34:48,040 --> 02:34:50,120 and which would include it in the ordinance 1934 02:34:50,120 --> 02:34:52,700 that a third party inspection and monitoring 1935 02:34:52,700 --> 02:34:55,000 for E&M Resonance sediment control 1936 02:34:55,000 --> 02:34:56,500 would also need to occur. 1937 02:34:56,660 --> 02:34:58,780 And I do want to point out that the Department 1938 02:34:58,780 --> 02:35:02,380 of Environmental Quality has recently changed its standards 1939 02:35:02,380 --> 02:35:09,800 back in 2022 to require the solar projects to meet more stringent requirements due to the 1940 02:35:09,800 --> 02:35:18,340 ENS concerns that have occurred statewide and throughout the country, honestly. And so previously 1941 02:35:18,340 --> 02:35:24,300 solar facilities were not considered impervious. They are now considered impervious through 1942 02:35:24,300 --> 02:35:30,280 DQ so they do have to meet stringent more stringent erosion and sentiment control measures. 1943 02:35:30,280 --> 02:35:36,970 We are asking that the Planning Commission to provide those feedback on those areas. 1944 02:35:37,410 --> 02:35:41,090 We would like to provide the recommendation to the Board of Supervisors. 1945 02:35:41,250 --> 02:35:47,170 Once the Board of Supervisors is here this, we will incorporate this policy language into 1946 02:35:47,170 --> 02:35:48,730 the comprehensive plan. 1947 02:35:49,530 --> 02:35:55,930 And then also there would be ordinance amendments moving forward related to the policy to allow 1948 02:35:55,930 --> 02:35:57,970 these uses within the zoning code. 1949 02:35:57,970 --> 02:36:02,990 I'll be happy to answer any questions, and I'm going to leave the slide up with a decision 1950 02:36:02,990 --> 02:36:06,330 point and look forward to hearing your feedback. 1951 02:36:07,010 --> 02:36:07,650 Thank you. 1952 02:36:21,510 --> 02:36:23,090 Public comment period. 1953 02:36:23,430 --> 02:36:25,710 There's no requirement for public hearing. 1954 02:36:27,450 --> 02:36:29,150 It's one commission's discretion. 1955 02:36:29,390 --> 02:36:35,350 Yeah, one quick question, and this concerns the email I forwarded to you today from Mr. 1956 02:36:35,350 --> 02:36:42,290 to act in some, and he talked about trying to get about a definition for clustering. 1957 02:36:45,780 --> 02:36:49,510 What exactly is this clustering or adequate spacing mean? 1958 02:36:52,710 --> 02:37:00,850 And like I had pointed out, we had in the original policy, it specifically said three miles. 1959 02:37:02,170 --> 02:37:04,390 The board asked us to remove that. 1960 02:37:04,390 --> 02:37:15,430 So the planning commission can recommend to the board that they put it back in, there is no correct number is three miles to close is at 3.5 miles. 1961 02:37:15,570 --> 02:37:17,050 There is no exact number. 1962 02:37:18,030 --> 02:37:32,190 But I think it's bringing this up in the policy is something that a tool that you can use as your evaluating a conditional use permit application if it's one that's next door to another one, 1963 02:37:32,190 --> 02:37:36,850 our mile may only be a mile and a half way and you might feel like that's much for that 1964 02:37:36,850 --> 02:37:41,970 particular road. And I think that was what the concern was is using that artificial 1965 02:37:41,970 --> 02:37:47,350 three-mile standard, what was the right setback, our distance. 1966 02:37:49,270 --> 02:38:02,170 And one thing I won't clarify is that the $23,000 fee per megawatt is that one time fee 1967 02:38:02,170 --> 02:38:04,410 a one-time payment to the Council. 1968 02:38:05,490 --> 02:38:12,690 So the end-exing to the CPI, the 23 and change that's recommended in now, that's what 1969 02:38:12,690 --> 02:38:18,670 would be the county policy, once the compound is assuming it's approved by the Board of 1970 02:38:18,670 --> 02:38:25,970 Supervisors and its implemented, that would be the 23,000 for 12 months and then that 23,000 1971 02:38:25,970 --> 02:38:32,850 would then go up based on what the CPI is for anyone who had applications subsequent to that 1972 02:38:32,850 --> 02:38:34,470 12 month period for the next 12 months. 1973 02:38:34,830 --> 02:38:35,010 Correct. 1974 02:38:35,110 --> 02:38:41,370 And we have been there that we would evaluate and relook at the formula every member of 1975 02:38:41,370 --> 02:38:48,050 his three years or five years, every three years, so that as the capital projects in the 1976 02:38:48,050 --> 02:38:49,110 model would change. 1977 02:38:49,230 --> 02:38:49,470 Okay. 1978 02:38:49,690 --> 02:38:52,410 I just want to make sure we're clear on that. 1979 02:38:53,350 --> 02:38:55,650 Comments questions from commissioners. 1980 02:38:58,450 --> 02:39:00,910 I just, Mr. McGee, go ahead. 1981 02:39:01,350 --> 02:39:01,990 Appreciate that. 1982 02:39:02,310 --> 02:39:07,270 This is not a big deal, but I know my friend Commissioner Whitaker had commented a few 1983 02:39:07,270 --> 02:39:12,630 times about maintenance and upkeep of the large fields like the grass getting tall. 1984 02:39:12,770 --> 02:39:18,570 I mean, is anything we can do to make sure they look nice or the grass is called or 1985 02:39:18,570 --> 02:39:21,870 maintained or is that nothing we can really do? 1986 02:39:22,770 --> 02:39:37,350 We can add some language in there and we can work look at work with the county attorney's office to see if we can add some language when we actually do the ordinance about maintenance or something like that. 1987 02:39:37,690 --> 02:39:41,370 I think we can certainly add that type of language to the ordinance. 1988 02:39:43,550 --> 02:39:45,630 Thank you, Mr. Abbott. 1989 02:39:48,670 --> 02:39:55,950 On the one-time fee, if they were to come into the retrofit, the whole farm again, does that 1990 02:39:55,950 --> 02:39:56,890 fee apply again? 1991 02:39:58,670 --> 02:40:00,650 If they were just replacing panels? 1992 02:40:01,310 --> 02:40:09,730 My concern is the technology I've brought this up before, if the panels are 50 watt, just throw 1993 02:40:09,730 --> 02:40:10,690 a number out there. 1994 02:40:10,690 --> 02:40:14,670 And then they have a panel now that can do 100 watts 1995 02:40:14,670 --> 02:40:17,750 in the same footprint, and they come in and replace all the things. 1996 02:40:19,110 --> 02:40:21,630 Do we charge them, or do we care about that? 1997 02:40:21,670 --> 02:40:22,850 Do we charge them for it? 1998 02:40:23,170 --> 02:40:25,070 So when they do the conditional use permit, 1999 02:40:25,290 --> 02:40:26,690 they'll have a concept plan. 2000 02:40:26,690 --> 02:40:29,330 And if their concept plan remains the same, 2001 02:40:30,190 --> 02:40:32,690 then we would not go back and recharge them. 2002 02:40:32,910 --> 02:40:39,430 However, the tax would change because, and that's one of the things 2003 02:40:39,430 --> 02:40:45,790 is that the, the tax, the machinery and tools tax, one of the reasons why it was more viable 2004 02:40:45,790 --> 02:40:52,010 option is because there could be potential for changes over time. But if there was something 2005 02:40:52,010 --> 02:40:58,770 that they were increasing the wattage, then they would have to amend their conditional use 2006 02:40:58,770 --> 02:41:01,590 permit and we could look at a fee at that point. 2007 02:41:01,590 --> 02:41:05,850 Okay, I'll just comment on these so we can get good. 2008 02:41:06,330 --> 02:41:11,270 And I guess one other thing that I did not put on the slide, 2009 02:41:11,450 --> 02:41:13,350 but Mr. Glid Better did bring it up. 2010 02:41:13,690 --> 02:41:16,390 We did have that median medium scale one, 2011 02:41:16,590 --> 02:41:18,270 which was five to 20 acres. 2012 02:41:19,110 --> 02:41:21,770 So I'd like to feedback if you prefer those three. 2013 02:41:21,910 --> 02:41:22,750 I'm 20 megawatts. 2014 02:41:23,110 --> 02:41:24,490 Five to, yeah, what did I say? 2015 02:41:24,530 --> 02:41:25,210 Thank you. 2016 02:41:26,210 --> 02:41:27,070 Been a long night. 2017 02:41:28,110 --> 02:41:29,890 Whether you like that small medium large, 2018 02:41:29,890 --> 02:41:31,730 for if you just like small and large. 2019 02:41:34,790 --> 02:41:36,430 On the things that we have to decide, 2020 02:41:36,770 --> 02:41:38,850 I think. 2021 02:41:39,090 --> 02:41:41,110 There's a thousand acres too big. 2022 02:41:42,790 --> 02:41:44,290 And, you know, what's the difference. 2023 02:41:45,350 --> 02:41:47,530 The, the, the, this is between the other one. 2024 02:41:48,330 --> 02:41:50,730 If we, if we say, yes, a thousand acres too big 2025 02:41:50,730 --> 02:41:54,270 and they're, and they're coming with 500 acres 2026 02:41:54,270 --> 02:41:56,350 and then coming right next to us, 2027 02:41:56,450 --> 02:41:59,390 but another 500 acre, so I don't know how we can have 2028 02:42:00,770 --> 02:42:04,430 one without the other is my point. 2029 02:42:04,870 --> 02:42:08,310 I don't think there's got to be a minimum distance 2030 02:42:08,310 --> 02:42:11,790 or a minimum consecutive, I don't know. 2031 02:42:13,210 --> 02:42:15,250 But is it a thousand acres too big? 2032 02:42:15,810 --> 02:42:17,330 That sounds like a lot to me. 2033 02:42:18,670 --> 02:42:19,910 I think it's too big for the SS. 2034 02:42:25,470 --> 02:42:25,590 Yeah. 2035 02:42:25,910 --> 02:42:28,970 If you don't mind, maybe we should kind of go in order 2036 02:42:28,970 --> 02:42:30,090 or do we want to? 2037 02:42:30,470 --> 02:42:34,130 So first of all, do you like the small meeting in large 2038 02:42:34,130 --> 02:42:42,690 the small march. Do you like having that medium scale? You're saying though that the guidelines 2039 02:42:42,690 --> 02:42:49,410 are the same for the medium and the large. Yes. So other than the name, there's no duplicions. 2040 02:42:50,890 --> 02:42:57,130 Less for average? I think that's okay. Anybody else have a comment on that part? They're 2041 02:42:57,130 --> 02:42:57,370 Okay. 2042 02:42:59,190 --> 02:42:59,490 Yep. 2043 02:43:00,170 --> 02:43:00,410 For now. 2044 02:43:01,370 --> 02:43:01,550 Okay. 2045 02:43:02,550 --> 02:43:10,430 And then, right now, you can do the large or small within the suburban service area. 2046 02:43:11,990 --> 02:43:16,310 There are concerns that, you know, if you have a large one within the suburban service 2047 02:43:16,310 --> 02:43:24,190 area that you are taking up land that is designated for a growth area, it would make the next 2048 02:43:24,190 --> 02:43:27,470 person have to extend utility lines much longer. 2049 02:43:27,970 --> 02:43:33,250 On the flip side of that, some of the positive is that we less growth in the suburban 2050 02:43:33,250 --> 02:43:40,930 service area, which could have be good or bad, depending on if that balancing of all 2051 02:43:40,930 --> 02:43:41,370 the interest. 2052 02:43:41,450 --> 02:43:46,690 Which, theoretically, could potentially, as some point in time down the road, consider 2053 02:43:46,690 --> 02:43:49,690 have to push the suburban service area out. 2054 02:43:50,450 --> 02:43:50,910 That is right. 2055 02:43:50,910 --> 02:43:52,050 Which is not popular. 2056 02:43:53,430 --> 02:43:54,250 I'm in agreement with that. 2057 02:43:54,250 --> 02:43:58,070 I don't think anything over five should be in the suburban service area. 2058 02:43:59,170 --> 02:43:59,750 I agree with that. 2059 02:44:00,150 --> 02:44:02,690 Can I ask a quick question on that? 2060 02:44:03,530 --> 02:44:04,810 We talk about five megawatts. 2061 02:44:04,950 --> 02:44:06,750 What's the size of something like that? 2062 02:44:07,530 --> 02:44:09,090 How many acres would that? 2063 02:44:10,590 --> 02:44:13,150 That's about, usually about 50 acres. 2064 02:44:13,150 --> 02:44:20,270 have it in the very beginning here or maybe I took it out of that slide. So five megawatts would 2065 02:44:20,270 --> 02:44:33,750 be about 50-50-75 acres. Some of the ones that are the larger ones are, you know, 6-800 acres 2066 02:44:33,750 --> 02:44:40,010 and he really large. So if you took 800 acres in the Spurven Service area that would be pretty 2067 02:44:40,810 --> 02:44:50,490 50 acres in the SSA is pretty big too. I'm not sure, I like anything in there, but that's just my opinion. 2068 02:44:51,690 --> 02:44:55,070 I don't, I don't, I don't want to see solar in the SSA at all. 2069 02:44:56,840 --> 02:44:59,960 We'll have a, you know, protecting the SSA. 2070 02:45:00,000 --> 02:45:10,060 Let's say if you, whatever you let them put in now, as soon as you're going to be at, we're back asking people to expand the SSA, and we all though that's not popular at all. 2071 02:45:10,980 --> 02:45:17,160 So anything you give up in there, it just makes it that much closer to being able to do that. 2072 02:45:20,980 --> 02:45:24,740 Do we have any requests on the board right now within the SSA? 2073 02:45:25,240 --> 02:45:26,180 Yes, we do. 2074 02:45:26,180 --> 02:45:34,040 We do. We have a proposal for if believe it's 800 acres within the SSA. 2075 02:45:37,990 --> 02:45:41,930 In my opinion, those projects can get met with a lot of opposition. 2076 02:45:42,510 --> 02:45:45,530 And I think it's going to be a waste of time on everybody's part. 2077 02:45:46,950 --> 02:45:53,550 I, Chairman, I agree now. I think about with, must Mr. Abbott saying, 2078 02:45:53,550 --> 02:46:01,850 I, I think to be a real problem there, 50 acre, you just don't have 50 acres to be able to do that. 2079 02:46:02,170 --> 02:46:05,130 And it's going to definitely be a domino effect. 2080 02:46:06,750 --> 02:46:12,810 So I'm hearing definitely know utility scale, SSA, which are the greater than 5 megawatts. 2081 02:46:13,050 --> 02:46:21,930 And then I've heard two, it's no, not even the small scale, 5 megawatts or less in SSA. 2082 02:46:23,270 --> 02:46:25,750 I don't know that I have a problem with that. 2083 02:46:25,970 --> 02:46:28,530 You may have some lands not conducive to build on, 2084 02:46:28,970 --> 02:46:31,150 so it may be appropriate on something like that, 2085 02:46:31,430 --> 02:46:35,560 but I don't, it doesn't make a whole lot of difference to me. 2086 02:46:35,880 --> 02:46:38,880 I just don't want to see the large acreage 2087 02:46:38,880 --> 02:46:41,940 to get taken up, and then the suburban service area 2088 02:46:41,940 --> 02:46:43,580 have to be expanded into the rule, 2089 02:46:43,660 --> 02:46:45,940 because we know everybody does not want that. 2090 02:46:46,480 --> 02:46:51,560 So, are you saying that you'd like to see nothing 2091 02:46:51,560 --> 02:46:57,780 within the SSA. I mean let's get some princesses for one on this. 2092 02:46:58,520 --> 02:47:02,800 How many acres would they five on the five if it was five if it was five 2093 02:47:02,800 --> 02:47:08,480 like a watch? I'm going to say 50 or 75 but I'm going to look at my my industry 2094 02:47:08,480 --> 02:47:15,580 well it's a we have about 50 to 75 acres for less of five acres per 2095 02:47:15,580 --> 02:47:23,040 megawap so could be 25 acres in that could vary and that would depend 2096 02:47:23,040 --> 02:47:25,520 on the currently and being perfectly flat. 2097 02:47:25,660 --> 02:47:27,460 I don't want to worry because things like that. 2098 02:47:27,580 --> 02:47:29,920 I mean, I personally wouldn't have problem with 25 acres. 2099 02:47:30,960 --> 02:47:31,740 I would probably worry. 2100 02:47:31,960 --> 02:47:33,260 But I wouldn't have 25. 2101 02:47:34,180 --> 02:47:37,600 I'd like 25 be fine, but an applicant bring it. 2102 02:47:37,880 --> 02:47:41,140 If it's a major opposition, you know, it's not. 2103 02:47:41,320 --> 02:47:42,120 I get done there. 2104 02:47:42,280 --> 02:47:44,840 Well, you have to remember some veneer of substation, anyway. 2105 02:47:45,580 --> 02:47:47,500 Because they came forward to run the lands. 2106 02:47:48,040 --> 02:47:48,280 Right. 2107 02:47:48,440 --> 02:47:50,440 Both are small, look like that. 2108 02:47:51,640 --> 02:47:51,760 Okay. 2109 02:47:51,760 --> 02:47:57,340 the other thing is on the five megawatt within the SSA. 2110 02:47:57,880 --> 02:48:00,320 I just want to make sure that we're at the end of the day. 2111 02:48:00,340 --> 02:48:06,760 The five megawatt, you said we would take about 50 acres, 25, 25, 25, 25 acres, okay. 2112 02:48:07,800 --> 02:48:11,620 That would be permitted in the SSA, nothing bigger than that, but then the SSA is what we're saying. 2113 02:48:12,680 --> 02:48:18,000 Okay, the only common I think I could be okay with 25 acres on the common I would have 2114 02:48:18,000 --> 02:48:22,120 is I don't want to, I don't want things running together, I don't want somebody coming 2115 02:48:22,120 --> 02:48:28,560 the next day and say, I want this 25 acres to do the same dang thing, so I think we've got to figure that out too. 2116 02:48:30,220 --> 02:48:35,300 So do you want to put a distance between them with an SSA and not outside of that SSA? 2117 02:48:37,380 --> 02:48:39,400 With a classroom comment, take care of that. 2118 02:48:40,040 --> 02:48:42,600 I think this kind of wants to stay in order. 2119 02:48:42,720 --> 02:48:44,600 Yeah, we're fine with that. 2120 02:48:45,480 --> 02:48:52,460 Can we put in there a number of the 25 acres? 2121 02:48:54,880 --> 02:49:01,240 I think it's a matter of visualizing what does that look like, you know, five megawatts. 2122 02:49:01,720 --> 02:49:07,740 I feel much better if it's, we say, no greater than 25 acres or something like that. 2123 02:49:07,960 --> 02:49:08,700 Do you think that says that? 2124 02:49:08,820 --> 02:49:09,580 Yes, I say. 2125 02:49:13,810 --> 02:49:21,710 And that would mean that you have the absolute perfect shape property and perfect typo and things like that. 2126 02:49:22,270 --> 02:49:26,950 And then that's another question I'll ask, because, well, I'm sorry, you had no idea. 2127 02:49:27,030 --> 02:49:27,630 I'd run on. 2128 02:49:28,090 --> 02:49:34,630 But to Mr. Ledbetter's point, if the property was undevelopable for buildings and things like that, 2129 02:49:34,850 --> 02:49:37,590 probably wouldn't be used for solar as well too, right? 2130 02:49:38,490 --> 02:49:39,550 Is that a fair assumption? 2131 02:49:43,240 --> 02:49:47,940 Well, if it was right beside a substation, you wouldn't want to build a home near that. 2132 02:49:48,900 --> 02:49:53,960 No, but what I'm saying is if you, what kind of conditions do we need to build this solar 2133 02:49:53,960 --> 02:50:01,160 form, does it have to be flat, does it have to be, and if it has to be flat, then why couldn't 2134 02:50:01,160 --> 02:50:07,000 we, just because it's next to a subsation? But now, I think we heard that they don't need 2135 02:50:07,000 --> 02:50:11,820 to be next to a subsation anymore. So that's also a concern. 2136 02:50:19,500 --> 02:50:20,360 Anybody else? 2137 02:50:26,840 --> 02:50:29,060 I'm not sure you 2138 02:50:31,140 --> 02:50:33,420 can, I'm not sure you can put the 2139 02:50:35,850 --> 02:50:37,250 25 acres, you know, if you 2140 02:50:37,250 --> 02:50:41,610 talk with an undevelopable way. I think the 25 acres is fine. And then I think it's going 2141 02:50:41,610 --> 02:50:45,790 up to a developer to the table and not even put it there or not. 2142 02:50:46,590 --> 02:50:49,890 I mean, if it's under developer way and he says I can do it, I mean, that's his 2143 02:50:49,890 --> 02:50:50,710 net goal. 2144 02:50:55,490 --> 02:51:00,550 So I'm able to cave with it up to 25 watts, that's just, again, you mean, 25 acres? 2145 02:51:00,650 --> 02:51:01,490 I mean, 25 acres? 2146 02:51:01,650 --> 02:51:02,130 I'm sorry, yeah. 2147 02:51:02,310 --> 02:51:03,390 Yeah, what does that rate for? 2148 02:51:03,850 --> 02:51:04,230 It's catching. 2149 02:51:04,530 --> 02:51:04,870 It's catching. 2150 02:51:04,870 --> 02:51:05,230 It's catching. 2151 02:51:05,330 --> 02:51:05,430 It's catching. 2152 02:51:05,430 --> 02:51:06,570 You can do it like that. 2153 02:51:09,600 --> 02:51:10,260 Any other comment? 2154 02:51:11,480 --> 02:51:12,080 Only other thing? 2155 02:51:12,080 --> 02:51:18,540 Well, I think we need to, I'll take it and discuss the, let's hear it. 2156 02:51:18,840 --> 02:51:20,860 Yeah, I just don't think we need to discuss the thousand acres. 2157 02:51:21,680 --> 02:51:22,300 Yeah, okay. 2158 02:51:24,140 --> 02:51:28,200 What, um, any suggestions on what that number should be? 2159 02:51:30,770 --> 02:51:31,850 Not a thousand. 2160 02:51:34,190 --> 02:51:35,030 Not a thousand. 2161 02:51:36,650 --> 02:51:37,550 Max, I would say. 2162 02:51:37,550 --> 02:51:40,530 Do you know what other, um, candies, other jurisdictions? 2163 02:51:40,530 --> 02:51:44,130 How do you know what restrictions they might have? 2164 02:51:46,070 --> 02:51:47,870 You know, it's wildly different. 2165 02:51:48,570 --> 02:51:52,950 Some localities have a maximum acreage for their entire county. 2166 02:51:53,730 --> 02:51:55,930 Some have different ones. 2167 02:51:56,370 --> 02:51:58,190 There is not a clear clear. 2168 02:51:58,210 --> 02:52:02,890 You know, a total maximum acreage or maximum per flight. 2169 02:52:03,730 --> 02:52:06,050 Total maximum for the entire county. 2170 02:52:06,230 --> 02:52:08,470 Some have total maximum for the site. 2171 02:52:08,470 --> 02:52:12,870 but it's there is, is this a such a new technology every local 2172 02:52:12,870 --> 02:52:17,110 these doing, dealing with it, but I don't think there's a correct number. 2173 02:52:20,070 --> 02:52:23,450 I think it's best to be conservative on this. 2174 02:52:23,470 --> 02:52:26,450 I think a thousand seems like a lot. 2175 02:52:26,570 --> 02:52:31,210 And if we need to adjust, this isn't, this isn't etched and stone. 2176 02:52:31,370 --> 02:52:35,690 We can revisit it, but it's a what number do you think? 2177 02:52:36,530 --> 02:52:39,450 I think this will happen, I said, five hundred vagus. 2178 02:52:40,130 --> 02:52:40,690 I got a question. 2179 02:52:40,990 --> 02:52:42,410 How big was broadcasts? 2180 02:52:42,710 --> 02:52:43,250 Two hundred. 2181 02:52:43,250 --> 02:52:43,670 Two hundred. 2182 02:52:44,090 --> 02:52:44,610 Two hundred. 2183 02:52:44,610 --> 02:52:44,890 Two hundred. 2184 02:52:45,310 --> 02:52:47,410 Two hundred. 2185 02:52:48,170 --> 02:52:49,750 And that's plenty big for me. 2186 02:52:53,080 --> 02:52:55,360 I would be in agreement with that for this plan. 2187 02:52:56,320 --> 02:52:57,060 Two hundred. 2188 02:52:57,800 --> 02:52:58,360 Two hundred. 2189 02:52:58,360 --> 02:52:58,580 Two hundred. 2190 02:52:59,500 --> 02:53:01,640 Two hundred. 2191 02:53:02,180 --> 02:53:02,780 Two hundred. 2192 02:53:02,980 --> 02:53:03,080 Two hundred. 2193 02:53:04,600 --> 02:53:05,800 Two hundred. 2194 02:53:05,800 --> 02:53:07,880 Yeah, that's what I'm thinking about. 2195 02:53:09,100 --> 02:53:12,960 It was bigger, they got a cup bigger, 2196 02:53:13,640 --> 02:53:15,220 thinking they were trying to hand over town. 2197 02:53:15,400 --> 02:53:16,840 They never found hand over town, 2198 02:53:17,000 --> 02:53:18,660 so they reduced the cup down to like, 2199 02:53:18,760 --> 02:53:20,400 two, 16, or something. 2200 02:53:22,280 --> 02:53:23,440 What do you know about the megawatts post? 2201 02:53:23,580 --> 02:53:25,460 So the owner put in something like 250. 2202 02:53:26,320 --> 02:53:27,340 I'm gonna just give her a number. 2203 02:53:29,430 --> 02:53:31,270 That's five hundred to two, I have about 250. 2204 02:53:31,490 --> 02:53:32,370 I said 250. 2205 02:53:33,350 --> 02:53:34,230 I'm okay with that. 2206 02:53:34,570 --> 02:53:35,270 Okay, it's 250. 2207 02:53:35,910 --> 02:53:36,110 Okay. 2208 02:53:36,730 --> 02:53:38,350 It's the last bottle you'll get with that. 2209 02:53:39,350 --> 02:53:39,450 Yes. 2210 02:53:39,450 --> 02:53:40,830 Look, it's the water come. 2211 02:53:41,830 --> 02:53:42,030 Yes. 2212 02:53:44,140 --> 02:53:45,300 And then what about the clustering? 2213 02:53:45,720 --> 02:53:49,600 Because they talk about putting them in across the street on 360. 2214 02:53:49,900 --> 02:53:51,920 So what are we, yes, they are. 2215 02:53:52,120 --> 02:53:53,420 What are we going to address that in broad? 2216 02:53:53,480 --> 02:53:54,920 That's outstanding issue out there. 2217 02:53:55,040 --> 02:53:55,740 They already have the project. 2218 02:53:55,740 --> 02:53:57,720 Well, they have the project that turned down. 2219 02:53:57,820 --> 02:53:58,980 You have the number two. 2220 02:54:02,460 --> 02:54:06,780 So would we prohibit one from going on the other side of 360? 2221 02:54:07,860 --> 02:54:10,000 Well, I don't like the idea of it being 2222 02:54:10,000 --> 02:54:13,740 I think within the, as I say, that, that I don't like. 2223 02:54:14,100 --> 02:54:16,640 That's out of the, as I say, I'm a little more, 2224 02:54:16,860 --> 02:54:19,120 you know, come on, twist it a little bit. 2225 02:54:19,460 --> 02:54:21,880 But I'm not going to tell you if you're going to take up 25 acres. 2226 02:54:22,460 --> 02:54:24,920 I don't think, I think we should have some sort of a 2227 02:54:24,920 --> 02:54:27,080 distance between facilities there. 2228 02:54:27,880 --> 02:54:29,960 We're all in having another one coming with another request 2229 02:54:29,960 --> 02:54:31,920 way beside it. 2230 02:54:34,500 --> 02:54:41,300 Now, my issue with that is, you just agreed on 250 acres, right? 2231 02:54:41,980 --> 02:54:42,040 Yeah. 2232 02:54:42,200 --> 02:54:43,200 Outside the SSA. 2233 02:54:44,080 --> 02:54:48,020 There's nothing saying that somebody can't come in and put three more right next to it. 2234 02:54:48,040 --> 02:54:53,140 And then right back up to a thousand and less something to the effect that you can't do that. 2235 02:54:53,580 --> 02:54:55,100 And I don't know what that will. 2236 02:54:55,100 --> 02:54:58,240 Burbage is, but you know what's going to happen? 2237 02:54:59,960 --> 02:55:01,280 How about property rights? 2238 02:55:01,280 --> 02:55:03,860 Well, that doesn't mean that we have to approve it if it brings a vibe. 2239 02:55:04,940 --> 02:55:10,460 No, but I think we should, you know, we should set the standard here, too. 2240 02:55:10,900 --> 02:55:13,140 We've got also got property rights, you can set it. 2241 02:55:16,880 --> 02:55:18,160 You don't know for the property home. 2242 02:55:21,570 --> 02:55:24,450 Two people have 250 acres and they're right beside each other. 2243 02:55:24,670 --> 02:55:26,090 How do you do now the other guy? 2244 02:55:27,090 --> 02:55:28,250 It's outside the SSA. 2245 02:55:28,370 --> 02:55:29,250 We can look at it. 2246 02:55:29,350 --> 02:55:30,790 I would be fine with that. 2247 02:55:31,570 --> 02:55:33,630 Yeah, that's sort of what I'm playing in. 2248 02:55:33,630 --> 02:55:36,670 But with any SSA, what kind of a distance? 2249 02:55:37,870 --> 02:55:40,290 I mean, this is something sort of new to us. 2250 02:55:40,830 --> 02:55:44,390 We could consider that three acre standard, 2251 02:55:44,750 --> 02:55:47,810 which has been used in other local, these three months. 2252 02:55:47,810 --> 02:55:48,190 I'm sorry. 2253 02:55:48,790 --> 02:55:49,970 Listen up, everything tonight. 2254 02:55:50,310 --> 02:55:53,210 Three miles, which was in the original policy, 2255 02:55:53,810 --> 02:55:56,750 three mile distance separation within the SSA. 2256 02:55:58,510 --> 02:55:59,230 In the SSA? 2257 02:55:59,590 --> 02:56:00,030 Yeah, 2258 02:56:04,500 --> 02:56:07,180 and then we can decide if we're outside of the other side of the other side. 2259 02:56:08,260 --> 02:56:10,420 Is everybody okay with that? 2260 02:56:10,920 --> 02:56:12,000 Just go with that. 2261 02:56:14,580 --> 02:56:16,760 Anything else that we need to address? 2262 02:56:19,270 --> 02:56:20,370 I think that's all of it. 2263 02:56:20,550 --> 02:56:30,250 So I think what was decided was that the changes in red that were shown would be incorporated in policy. 2264 02:56:31,990 --> 02:56:41,610 The recommendation would be to not allow no utility scale solar within the SSA, but could 2265 02:56:41,610 --> 02:56:50,130 do a small scale solar within the SSA, but no greater than 25 acres was their consistent 2266 02:56:50,130 --> 02:56:52,890 recommendation of that. 2267 02:56:53,030 --> 02:56:59,870 The maximum facility would be 25 acres, and then clustering within the SSA would be a three 2268 02:57:04,230 --> 02:57:17,670 on that on that 25. We came up with the 25 acre just based upon the five megawatt. We didn't just pull 25 acre. So if there is discussion with the board or whatever, there is a reason for that. 2269 02:57:18,910 --> 02:57:26,650 Would like the you know planning commission take a motion to forward this to the Board of Supervisors with those changes that I've had. 2270 02:57:26,650 --> 02:57:29,170 with what's in rear along with the changes tonight? 2271 02:57:30,390 --> 02:57:30,550 Okay. 2272 02:57:31,210 --> 02:57:32,190 I'll entertain that motion. 2273 02:57:32,470 --> 02:57:34,690 Someone want to make that motion the week. 2274 02:57:35,010 --> 02:57:42,930 Go ahead and send the solar energy storage policy onto the board with the changes 2275 02:57:42,930 --> 02:57:44,910 that we have noted tonight. 2276 02:57:45,850 --> 02:57:51,030 Want to have a draft along with the changes that have been mentioned tonight for the 2277 02:57:52,910 --> 02:57:55,870 So, we'll, can I ask Ms. Hunter a question, Joe? 2278 02:57:58,270 --> 02:58:02,150 We've got what we're doing here, do we have battery storage? 2279 02:58:03,290 --> 02:58:04,810 How does that come into play with this? 2280 02:58:04,990 --> 02:58:09,610 So, battery storage already has an ordinance in place. 2281 02:58:09,670 --> 02:58:13,850 This just provides some of the guidelines within the policy for the comprehensive plan. 2282 02:58:14,050 --> 02:58:22,090 Once the board approves the policy, we will follow up with ordinance amendments that address all the things in the policy 2283 02:58:22,090 --> 02:58:27,030 and codifying what could be codified as part of his own ordinance amendment. 2284 02:58:27,730 --> 02:58:31,170 So you'll see that back before you in the next few months or so. 2285 02:58:32,510 --> 02:58:32,650 Okay. 2286 02:58:32,790 --> 02:58:33,230 Thank you. 2287 02:58:33,370 --> 02:58:34,610 I have a motion from Mr. Abbott. 2288 02:58:34,750 --> 02:58:37,370 I have a second from Mr. McGee. Any other discussion? 2289 02:58:38,230 --> 02:58:38,850 I call for the question. 2290 02:58:39,050 --> 02:58:46,330 All in favor of sending the solar energy policy on with those changes to the board. 2291 02:58:46,510 --> 02:58:47,910 It's taking a five by saying aye. 2292 02:58:48,010 --> 02:58:48,450 Aye. 2293 02:58:48,530 --> 02:58:48,990 All opposed. 2294 02:58:49,550 --> 02:58:50,310 Motion carries. 2295 02:58:51,190 --> 02:58:53,670 Okay, anything on the miscellaneous? 2296 02:58:56,540 --> 02:58:56,920 No. 2297 02:58:57,740 --> 02:59:01,680 All right, not will be adjourned until our regular schedule meeting next week.