[0:00] I'll officially call to order the [0:02] regular meeting of Coachella Valley [0:04] Water District Board of Directors uh [0:06] January 13, 2026 here in Palm Desert. [0:09] And uh would you please stand and join [0:11] me in the pledge of allegiance? [0:14] >> Good morning. [0:19] » I pledge algiance to the flag of America [0:22] and to the republic for which it stands, [0:24] one nation, indivisibley [0:28] and justice for all. All [0:29] right. [0:33] And uh so prior to roll call, I would [0:36] like to make clear for the record of [0:37] this meeting and it should be reflected [0:39] in the minutes that at least a portion [0:41] of this meeting is being conducted [0:43] pursuant to California government code [0:44] section 54953 [0:46] in that director Aguilar is in Orlando, [0:49] Florida, and will be participating by [0:51] speakerphone. In accordance with the [0:54] Ralph M. Brown Act. The teleconference [0:56] location has been identified on the [0:58] agenda for this meeting. [snorts] Kirk [1:00] Bermudas, will you please call the role? [1:02] >> Yes. Good morning. And just a [1:03] » Yes. Good morning. And just a [1:03] clarification, he does have video. I [1:05] should have put teleconference, but he [1:07] does have video options on that. Uh, [1:09] President Pal [1:10] >> here. [1:10] » here. [1:10] >> Vice President Estrada [1:12] » Vice President Estrada [1:12] >> here. [1:12] » here. [1:12] >> Director Biano [1:13] » Director Biano [1:13] >> here. [1:14] » here. [1:14] >> Director Aguilar [1:15] » Director Aguilar [1:15] >> here. [1:16] » here. [1:16] >> And director Nelson [1:17] » And director Nelson [1:17] >> here. [1:18] » here. [1:18] >> Thank you. [1:19] » Thank you. [1:19] >> I would now like to request that [1:21] » I would now like to request that [1:21] Director Aguilar respond to the [1:22] following questions. one. Uh, Director [1:24] Agular, can you hear me well? [1:27] >> Yes, I can, John. [1:28] » Yes, I can, John. [1:28] >> Great. Yeah, I hear you, too. Um, were [1:31] » Great. Yeah, I hear you, too. Um, were [1:31] you able to hear our proceedings on this [1:33] end up until now? [1:35] >> Yes. [1:36] » Yes. [1:36] >> Do you have a copy of the agenda for [1:38] » Do you have a copy of the agenda for [1:38] this meeting? [1:39] >> I do. [1:40] » I do. [1:40] >> Have you posted the agenda at your [1:42] » Have you posted the agenda at your [1:42] location? [1:43] >> I have. [1:45] » I have. [1:45] Is your um location reasonably [1:48] accessible to the public that such such [1:50] that any member of the public could [1:51] participate in this teleconference from [1:53] your location if he or she wished to do [1:55] so? [1:56] >> Uh yes it is. [1:58] » Uh yes it is. [1:58] >> Is there any member of the public there [1:59] » Is there any member of the public there [2:00] with you who would like to participate? [2:02] >> Uh not at the moment. [2:04] » Uh not at the moment. [2:04] >> Okay. Well, just let us know. [2:07] » Okay. Well, just let us know. [2:07] >> Um [2:09] » Um [2:09] >> great. As a reminder, all votes for this [2:11] » great. As a reminder, all votes for this [2:11] meeting must be taken by roll call. [2:20] I got two pages at the same time. [2:24] >> What if I read the next one? It would [2:25] » What if I read the next one? It would [2:25] have been funny. Okay. So, uh, do we [2:28] have any additions, deletions, or [2:30] adjustments to the agenda? [2:32] >> No, sir, we do not. [2:34] » No, sir, we do not. [2:34] >> No, I don't think so. [2:37] » No, I don't think so. [2:37] Uh, is there anybody from the public [2:39] wishing to comment at this time? [2:43] non-aggenda items. [2:46] >> We we do have a couple just I'll just [2:47] » We we do have a couple just I'll just [2:47] note it for the record, not for uh [2:49] general public, but we do we will have [2:51] speakers for item 8A just so that the [2:53] board is aware. [2:55] >> Yes. All right. So, we will get those [2:56] » Yes. All right. So, we will get those [2:56] speakers at that time. And then um so [3:00] nobody with the public comment at this [3:03] time. We do have special presentations [3:06] and recognitions. [3:08] Uh and I will read for those who are [3:11] present. [3:13] Um, first of all, [3:17] with an anniversary, [3:19] John Van Winkle with 20 years. John [3:23] Vaninkl was hired as a distribution [3:25] operator trainee and has worked his way [3:27] up to a domestic equipment operator all [3:30] while serving on the West Shores crew. [3:32] Despite working under several crew [3:34] chiefs over the years, he has [3:36] consistently remained a valued and [3:37] reliable operator for the Sultan Sea [3:39] area. [3:41] Sultan City presents unique challenges [3:43] as water manes are located behind homes [3:46] and roads and roads wind in multiple [3:48] directions unlike other areas where they [3:50] typically run north, south, or east, [3:52] west. John's extensive knowledge of this [3:54] area makes him a major asset to the [3:57] team. From identifying problematic [3:58] locations to locating hard to find [4:01] isolation valves in alleyways and [4:03] backyards, [4:04] he knows to proactively check those [4:07] areas when reservoir levels start to [4:08] drop, often before customers report an [4:10] issue. John is a hard worker who [4:13] maintains a positive attitude and is [4:14] especially well suited to responding to [4:17] leaks around the salt and sea. [4:19] Congratulations on 20 years of service. [4:22] And we'll come up after and do that. and [4:25] then retirement. Olivia Bennett, [4:28] non-potable water program manager with [4:30] 23 years. When Olivia Bennett joined [4:34] CBWD in 2002 as a water quality lab [4:36] technician, she never imagined her [4:38] career would take her from running [4:40] atomic absorption machines to helping [4:42] transform some of Coachella Valley's [4:44] largest landscapes. [4:46] Born in Jacksonville, Illinois, Olivia [4:49] was a prevet major and received her [4:52] bachelor of science in biology from [4:53] McMurray College before moving to the [4:55] desert in 1997. [4:57] Her early love of animals and science [4:59] guided her path, including time at [5:01] veterinary clinics in the Living Desert. [5:04] Her science background earned her a [5:05] position in the district's lab as a [5:07] technician, then as a lab analyst, then [5:10] an engineering technician in water [5:12] resources. Eventually, she stepped into [5:15] her longtime management position [5:16] overseeing recycled and non-potable [5:18] water operations. [5:20] Tom West, assistant director for [5:22] operations for sanitation, stated that [5:24] Olivia's always been ahead of the game, [5:27] taking the non-potable program from an [5:30] idea to the strong, successful program [5:32] that it is today. She's not just [5:34] professional and organized. She's the [5:35] kind of person who makes the world, the [5:38] whole team better with her energy and [5:40] kindness. We're really going to miss [5:41] her. [5:46] It goes on. [5:48] [laughter] [5:51] I will miss you a little later. Um, [5:53] they've always been changing my [5:56] responsibilities around, giving me [5:57] something new to focus on, which I [5:59] appreciate because it has been it has [6:01] kept my brain going, says Olivia. For [6:04] the last 15 years, Olivia has shouldered [6:06] CVW's non-potable water program, which [6:09] transitions golf courses, large [6:11] landscape properties and agricultural [6:13] irrigation from groundwater to [6:15] non-potable water. Under her leadership, [6:18] non-potable water use rose dramatically [6:20] with some sites achieving 100% recycled [6:23] water usage. Olivia now looks forward to [6:26] hiking, painting, quilting, and picking [6:28] up new skills like beekeeping, chicken [6:31] raising. guessing you're going to raise [6:34] eggs [laughter] [6:35] and gardening. She plans to enjoy more [6:39] time with her husband Rick, also a CBWD [6:41] retiree, and their pack of shorty bulls, [6:44] Lugnut, Lauraai, Groucho, and Chicky [6:47] Blue, [laughter] [6:49] who rule the house. From nurturing [6:52] animals to nurturing landscapes, [6:53] Olivia's career has come full circle as [6:56] she prepares to trade fairways and [6:58] pumping stations for something closer to [7:00] her roots, acres of open land. [7:03] That was actually really well written. [7:05] And I would say um when we list the [7:07] dogs, the pets names, they have to be [7:09] cute like that otherwise we're not going [7:11] to read. [laughter] [7:12] Those are wonderful names. Okay. So, and [7:15] then we also who are not here um Alberto [7:17] Rodriguez, building maintenance [7:19] technician with 20 years. Alejandra, [7:22] these are retirements, right? Alejandro [7:25] Silva, fleet and equipment technician [7:28] two with 20 years. and Steuart Taylor [7:30] fleet and equipment manager with eight [7:32] years. So, congratulations to everybody [7:34] and we'll have the two present come on [7:36] up one at a time, right? [applause] [7:56] » Thank you. I really want to ask you a [7:58] bunch of questions. [8:01] >> All right. [clears throat] [8:19] It's up to you. [8:20] >> You meant a few words. [8:24] » You don't have to. [8:25] >> No, I'd rather not. [8:27] » No, I'd rather not. [8:27] >> All right. [8:28] » All right. [8:28] >> Put my foot in my mouth. [8:30] » Put my foot in my mouth. [8:30] [laughter] [8:32] >> Thank you. [8:34] » Thank you. [8:34] >> Great. [8:35] » Great. [8:35] >> Thank you. [8:35] » Thank you. [8:35] >> What about the questions? You had a [8:36] » What about the questions? You had a [8:36] whole bunch of questions. [8:37] >> Well, I mean, do you get to know people? [8:39] » Well, I mean, do you get to know people? [8:39] >> Yeah. Well, I've lived out there since I [8:41] » Yeah. Well, I've lived out there since I [8:41] was 13, so yeah, like I've met a lot of [8:44] people and they usually come up and [8:46] start asking me before if they see if [8:48] they see me in the middle of the street [8:49] or something, they'll start asking [8:51] questions like what what we're doing and [8:53] all that. But, you know, or if they if [8:55] we got the water off and somebody's [8:57] upset, if they see me there, they'll [8:58] come talk to me. I'm usually able to [9:00] smooth it over. [9:02] >> But it's been it's been a long it's been [9:04] » But it's been it's been a long it's been [9:04] a long ride, but it's been a fun ride. [9:06] >> I feel like I'm working for K. [9:08] » I feel like I'm working for K. [9:08] [laughter] [9:09] >> Thank you. [9:09] » Thank you. [9:09] >> If you were working for KSQ, you'd be [9:11] » If you were working for KSQ, you'd be [9:11] holding the camera, too. [9:12] >> That's right. [9:14] » That's right. [9:14] >> Thank you. [9:14] » Thank you. [9:14] >> Thank you. [9:15] » Thank you. [9:15] >> Thank you. Stay out. [9:16] » Thank you. Stay out. [9:16] >> I will [applause] [9:24] for you. [9:46] » [cough] [9:48] >> They forgot to say you have a great [9:49] » They forgot to say you have a great [9:49] sense of you. [laughter] [9:51] >> I just wanted to say thank you to the [9:54] » I just wanted to say thank you to the [9:54] board for supporting the non-putable [9:57] program. [9:59] Um, and to my supervisors for trusting [10:03] me and giving me the freedom to do [10:05] whatever I needed to do. and to my crews [10:09] and my crew chief. I think you're [10:11] awesome and you can do anything. Um, [10:14] thank you to the customers for um [10:17] realizing the benefit to the community [10:20] and for using 80% non-potable water. Um, [10:24] thank you to my husband who I met here. [10:28] He retired five years ago, which we [10:30] still can't believe. [laughter] [10:32] Um, and ever since I started working [10:35] anywhere, I've wanted to retire. And um, [10:38] finally I'm eligible to do it. And I [10:42] cannot believe it's here. And it's [10:43] overwhelmingly joyful and um, scary all [10:48] at once. So, thank you so much. [10:51] >> Thank you. Appreciate it. [10:54] » Thank you. Appreciate it. [10:54] [applause] [10:59] » Stay healthy. Enjoy. Is this here? [11:20] Very nice. [11:23] >> Yeah, the non-potable program is kind of [11:25] » Yeah, the non-potable program is kind of [11:26] fundamental to what we do. It's [11:28] >> so amazing when people retire so early. [11:31] » so amazing when people retire so early. [11:31] >> [laughter] [11:32] » [laughter] [11:32] >> kidding, right? [11:33] » kidding, right? [11:33] >> Well, some do. [11:34] » Well, some do. [11:34] >> It's hard to believe. [11:35] » It's hard to believe. [11:35] >> Then they go out and get another job [11:36] » Then they go out and get another job [11:36] somewhere else. [11:39] >> So young. That's what I meant to say. [11:42] » So young. That's what I meant to say. [11:42] >> So again, [11:43] » So again, [11:43] >> yeah. Great. [11:46] » yeah. Great. [11:46] Our consent calendar consists of items 6 [11:49] A through L. [11:54] Is there a motion to approve the consent [11:56] calendar? [11:58] >> Yes. So move. [12:03] » [clears throat] [12:04] >> I'll second your uh motion there. And uh [12:09] » I'll second your uh motion there. And uh [12:09] all in favor or we are doing a roll. [12:12] >> Roll call vote, please. [12:13] » Roll call vote, please. [12:13] >> Yes. Uh President Pal, [12:14] » Yes. Uh President Pal, [12:14] >> I. [12:15] » I. [12:15] >> Vice President Estrada, [12:17] » Vice President Estrada, [12:17] >> yes. [12:17] » yes. [12:17] >> Director Biano, [12:18] » Director Biano, [12:18] >> yes. [12:19] » yes. [12:19] >> Director Aguilar, [12:21] » Director Aguilar, [12:21] >> yes. [12:21] » yes. [12:21] >> And director Nelson, [12:22] » And director Nelson, [12:22] >> I. [12:23] » I. [12:23] >> Thank you. 5. [12:25] » Thank you. 5. [12:25] >> Passed. 5. [12:27] » Passed. 5. [12:27] under the action calendar 8A. [12:31] Sabrina is gonna Yes. Good morning. [12:35] >> The floor is yours. [12:43] » Is it green? Green is [12:44] >> green. Green is on. [12:46] » green. Green is on. [12:46] >> Green means go. [12:47] » Green means go. [12:47] >> Good morning. Um for the record, my name [12:49] » Good morning. Um for the record, my name [12:49] is Sabrina, Sanji manager for domestic [12:53] water. Um that before you today is um [12:57] our recommendation to reject the bid [12:59] from TBU Incorporated as non-responsive [13:01] deemed de Domin I'm sorry uh deemed [13:04] Dominguez General Engineering [13:06] Incorporated bid protest moot and [13:08] authorize the general manager to execute [13:10] a construction contract with Dominguez [13:11] General Engineering as the lowest [13:13] responsive and responsible bidder in the [13:15] amount of $10,312,530 [13:18] for the Sun City domestic water Sun City [13:20] Palm Desert water main replacement phase [13:23] 2B project specification 2025-7 [13:26] and approve additional expenditures in [13:28] the for a total request of 11,930,000. [13:33] Um the item before you today uh we did [13:36] receive a bid protest um which alleged [13:40] that um TBU Incorporated failed to [13:44] attach a notary acknowledgement to the [13:45] non-colision declaration. It failed to [13:48] provide authority for Jesus Nunees as an [13:50] estimator to bind TBU Incorporated to [13:52] the bid and it failed to provide the [13:54] required fleet compliance certificates. [13:56] Um we did review this with legal counsel [13:59] um independently CBWD review the bids [14:01] and also recommended um that the bid be [14:04] deemed non-responsive and I'd be happy [14:06] to answer any additional questions that [14:08] you may have regarding this item. [14:16] Is this the item where we have [14:18] >> Yes, we have public comments. [14:19] » Yes, we have public comments. [14:20] >> We do have I just wanted to [14:21] » We do have I just wanted to [14:21] >> for consideration [14:23] » for consideration [14:23] >> just want to make sure we get through [14:24] » just want to make sure we get through [14:24] the presentation and then allow them. [14:26] >> All right. Are you do you have more [14:29] » All right. Are you do you have more [14:29] presentation? [14:30] >> Um no, unless there's any additional [14:31] » Um no, unless there's any additional [14:31] questions. [14:32] >> Okay. [14:35] Well, my my [14:38] questions and comments were going to be [14:40] more along the lines of the letter that [14:41] was submitted by the contractor that [14:44] submitted the protest and then there was [14:46] a response to that. [14:48] >> Correct. [14:49] » Correct. [14:49] >> So, I wanted to kind of hear more about [14:51] » So, I wanted to kind of hear more about [14:51] that, but I don't know if it's more [14:52] appropriate to wait after the comments. [14:57] >> I would. [14:58] » I would. [14:58] >> Yes. Is it is it normal that [15:02] » Yes. Is it is it normal that [15:02] um when a company leaves a few of these [15:06] things out um uh to reject it? Or [15:11] >> is there a chance for the district to go [15:13] » is there a chance for the district to go [15:13] back to them and say, "Hey, your your [15:14] bid looks good, but you've missed a few [15:16] things." Do you have this do you have [15:18] this paperwork that needs to be [15:20] submitted along with your bid, or it's a [15:24] >> we can't do that under the law? There [15:26] » we can't do that under the law? There [15:26] are times um and and Jeff can um chime [15:30] in on this, but there are times when [15:31] there's administrative errors. Um in [15:33] this case, there were multiple um issues [15:36] with this bid. It's not one particular [15:38] item. It were several items. [15:40] >> It would it be against the law to allow [15:44] » It would it be against the law to allow [15:44] them to [15:47] show you the information that was [15:48] missing? [15:50] >> And I can answer that question. Um the [15:52] » And I can answer that question. Um the [15:52] yes uh the bids have to be submitted and [15:55] all material aspects have to be correct. [15:58] If we were to go back to them and say [15:59] have just please give us give it to them [16:01] us now then there would be protest. In [16:04] fact there was a protest originally [16:06] submitted by the second lowest bidder to [16:08] outline these items. What the law says [16:10] is that you can't provide a the [16:13] opportunity for the lowest bid to go [16:15] back and change something or to clarify [16:17] something as that would be considered [16:19] under the law to give them an unfair [16:22] advantage over the other biders who [16:23] didn't make those requirements or met [16:25] those requirements. [16:28] What's the um what's the guidance that [16:31] we use or the standard um that [16:38] pushes us to rebid a project if [16:42] the next bid is substantially higher? Is [16:45] is there a guidance for that or are we [16:47] bound to accept the next [16:49] >> doesn't mount [16:50] » doesn't mount [16:50] >> are we bound to accept the next bid if [16:52] » are we bound to accept the next bid if [16:52] it's substantially higher? Yeah, I [16:55] believe that um the [16:56] >> unless there's a change in scope, [16:59] » unless there's a change in scope, [16:59] >> unless we decide to change the plans or [17:02] » unless we decide to change the plans or [17:02] the specifications from the original [17:04] design, we can't just go out and ask [17:05] people to take a second shot at the same [17:08] thing. [17:08] >> Even if it's a million dollars more or [17:10] » Even if it's a million dollars more or [17:10] 500,000, the amount doesn't matter. [17:12] >> Yes, sir. No, that's that's the rules. [17:14] » Yes, sir. No, that's that's the rules. [17:14] >> So, we represent to the bidding world [17:17] » So, we represent to the bidding world [17:17] that this is the bid we would want to [17:20] receive bids and these things had to be [17:22] met. If we were to because of the price [17:25] difference just rebid the entire project [17:28] that would go against what our contract [17:30] documents say and that we're going out [17:31] to bid to get this project done as long [17:34] as the lowest bidder meets all of these [17:36] requirements. So it would be based on if [17:39] there was some misunderstanding of what [17:41] the project was or that we [17:45] underestimated the cost of the entire [17:47] project or something like that. But [17:49] other than that, going out to rebid a [17:52] project based on a price differential [17:54] would go against what we've represented [17:55] to the public in our bid documents. [17:59] >> We could still decide not to do the [18:00] » We could still decide not to do the [18:00] project though altogether. [18:03] >> Yes, you can. [18:03] » Yes, you can. [18:03] >> Yeah, [18:04] » Yeah, [18:04] >> but that's exercising the contractor [18:06] » but that's exercising the contractor [18:06] community. [18:08] >> Yeah. I mean, that's why we [18:09] » Yeah. I mean, that's why we [18:09] >> that's why we ask you if we can go out [18:11] » that's why we ask you if we can go out [18:11] for a bid first. [18:12] >> Yeah. We we actually have the board take [18:14] » Yeah. We we actually have the board take [18:14] action to go out and put it out to bid [18:15] [clears throat] [18:16] with the idea that we're not going to be [18:18] exercising the bidding community. [18:20] >> Yeah. And I guess I I get all that. I [18:23] » Yeah. And I guess I I get all that. I [18:23] don't know how much time we have to get [18:24] into the details of this protest and the [18:27] response to that protest to then make a [18:29] determination on [18:32] just the different things that are being [18:33] claimed because there's seems like [18:35] there's two sides to a story here. [18:37] >> The protest Yeah, the protest is moot [18:39] » The protest Yeah, the protest is moot [18:39] though, right? So [18:41] >> I think protest. Well, that's the [18:43] » I think protest. Well, that's the [18:43] recommendation. [18:44] >> There was a protest from the second [18:45] » There was a protest from the second [18:45] lowest bidder to that outlined the [18:47] things that we as a staff had already [18:49] identified as making the lowest bidder [18:51] not responsive. [18:53] >> So, there were two bid two protests. One [18:55] » So, there were two bid two protests. One [18:55] was from the second lowest who is [18:57] recommended to get the contract because [18:59] they had identified things that made the [19:01] lowest bid nonresponsible. But we had [19:03] already done that as a staff and legal [19:06] counsel. So that's why we're here today [19:08] receiving a letter from the lowest [19:11] bidder the uh to protest not getting the [19:16] contract. So I mean [19:17] >> so so what you're saying is that it it [19:20] » so so what you're saying is that it it [19:20] the protest letter was not what [19:23] initiated us to [19:25] deem the bid non-responsive. We we we [19:28] were already kind of doing that. [19:30] >> We had already made that determination [19:31] » We had already made that determination [19:32] if if I'm correct. [19:33] >> That's correct. But but my point in [19:35] » That's correct. But but my point in [19:35] bringing up that issue is that [19:38] there would be a protest there was a [19:40] protest of the second lowest bidder [19:41] identifying the very things that we have [19:44] already identified. So you had a protest [19:46] from the lowest bidder who's here to to [19:49] speak but also from the second lowest [19:51] bidder identifying things that if we [19:53] didn't comply with the contract would be [19:55] things that they would have raised or we [19:57] raised them initially. [19:59] >> So I it might be good to get [20:01] » So I it might be good to get [20:01] >> the comments. All right. [20:03] » the comments. All right. [20:04] Right. Why don't we do that and then [20:05] maybe that'll lead to Yeah. some more [20:07] clarification or [20:09] >> Thank you. [20:10] » Thank you. [20:10] >> Sure. Uh first speaker I have is Brian [20:12] » Sure. Uh first speaker I have is Brian [20:12] Anders, please. [20:25] » Okay. [20:26] [laughter] [20:27] >> Yes, ma'am. [20:29] » Yes, ma'am. [20:29] Good morning all. Thank you very much. [20:31] My name is Brian Anders. legal counsel [20:32] for TBU, the lowest bidder. Um, I'd like [20:36] to thank you for the opportunity to [20:38] address the issues here. Uh, there's [20:39] already been quite a bit of discussion, [20:41] touched on some key points here. Um, [20:44] ultimately the timeline on this, the bid [20:46] was timely submitted. Uh, admittedly, [20:50] certain aspects of it were omitted. It [20:52] doesn't mean that they weren't prepared, [20:55] created. They were simply omitted from [20:58] the scan that was sent. Um [21:03] the board here does have the power to [21:05] wave any minor or inconsequential [21:07] irregularities. Uh I would like to point [21:10] out that the the bid the scope of uh the [21:14] scope of work remained the same. There [21:16] were no material changes uh made at the [21:19] at the time of any corrective efforts on [21:22] December 3rd which I think the the there [21:25] was a reference to the TVU letter that [21:26] came in with the documentation and an [21:28] explanation there too. I also have the [21:31] principal Ted and uh Jesus with me today [21:34] who also will be speaking and kind of [21:36] sharing their series of events and [21:38] explaining the background on all of [21:40] this. Um ultimately the facts are the [21:43] facts. [snorts] The the scope of work [21:45] proposed was there were no issues with [21:47] the scope sorry scope of work proposed. [21:50] Um and the bid up from TBU came in at [21:54] $560,000 [21:56] less than the next lowest bidder. um [22:03] taking the action taking the proposed [22:05] action of rejecting the lowest bid based [22:07] on what we perceive to be [22:09] inconsequential and immaterial grounds [22:11] to the extent that nothing substantive [22:13] about the bid itself was changed uh [22:17] would carry an unnecessarily punitive [22:20] tone. um per the recommend and per the [22:22] recommendation will result in a net [22:24] increase of not just 560,000 [22:27] but a total of over $1.6 million [22:32] um [clears throat] [22:34] for the same scope of work and award the [22:36] contract to a company located over 90 [22:38] miles from the job site. Uh in contrast, [22:41] TBU has offices in India. uh every they [22:45] they've got an office location and all [22:47] staff that would be servicing this [22:49] contract located within 10 mile radius [22:52] of the actual job site. Um [snorts] [22:56] not only that, TBU has an extensive [22:58] amount of experience not only in the [23:00] region but with the city of Coachella [23:02] itself. [23:04] That's my time. Thank you. You [23:09] » Thank you. Uh next we have Jesus Nunes. [23:22] Hello everybody. [23:23] >> Morning. [23:23] » Morning. [23:23] >> Good morning. [23:25] » Good morning. [23:25] Um, [23:27] pretty much uh just going to go piggy [23:30] backing off of s Andrew's over here and [23:33] pretty much just saying same things uh [23:36] just not so technical in his certain [23:40] vocabulary. Um [23:43] given my newly appointed position, I you [23:45] know I've been I just now got uh [23:48] promoted to an estimator back in May, [23:51] early May. Um [23:54] with the guidance of our vice president, [23:56] Charlie Wallen, and and my [23:57] superintendent supervisor, uh David [23:59] Eera, uh you know, we [24:03] you know, they've been working me. [24:05] They've been showing me the ropes of [24:07] everything of what it comes down to [24:08] bidding and you know bidding for [24:12] government funded projects. That's a [24:14] pretty big uh [24:16] it's a pretty big task at hand. You know [24:19] uh [24:20] and you know I double check, triple [24:23] check everything, make sure everything's [24:25] all right. Uh these were errors that of [24:28] course were not intentional. I didn't, [24:30] you know, they were not meant to deceive [24:32] or to uh malinterpret anything on behalf [24:36] of TBU. Uh, [24:39] you know, they're [snorts] clerical [24:41] errors. Uh, [24:44] yeah, they uh [24:47] know they no man said nothing. You know, [24:51] I I like to do things uh right. I like [24:54] to do things fair. you know, ultimately [24:58] you guys are sitting where you guys are. [25:00] You guys have the ultimate uh decision, [25:02] you know. Uh but I just wanted to give [25:05] you guys my opinion, my side of the [25:08] story and everything. Uh [25:11] hopefully that helps me, my case, and [25:14] our company's case because we like he [25:16] mentioned, we're all local here. our [25:18] company, you know, I've been working [25:19] with the company for uh close to six [25:22] years [25:23] for my whole duration with the company. [25:25] You know, we've always been working [25:26] here, you know, of course, the valley is [25:30] a slowly but surely growing community. [25:32] Uh but we've always tried to stay busy [25:34] here and like uh like we mentioned [25:37] earlier, we've had opportunities to work [25:39] with numerous uh [25:42] agencies here and and and whatnot. So, [25:45] you know, we like to keep our people [25:47] local. what we always like to say, we [25:49] like to make sure we stay at home, not [25:51] driving hours and end in the morning and [25:53] then driving hours afterwards. So, it'd [25:56] be a it'd be a pretty good project to [25:59] work on, you know, help out not just our [26:01] employees, but also our community with [26:04] replacing uh [26:07] possibly leaking, possibly uh damaged [26:10] lines. So, [26:11] >> yeah. [26:12] » yeah. [26:12] >> All right. Thank you. [26:16] » All right. Thank you. [26:16] >> Thank you. And then next we have Ted [26:19] » Thank you. And then next we have Ted [26:19] Burton. [26:26] » Good morning. Uh my name is Ted Burton. [26:28] I'm the owner of TBU Inc. Um I've been [26:31] doing this kind of work for 37 years and [26:34] we have grown enough that we have [26:36] branched out and now we're in uh India [26:39] and we have a locally based office 10 [26:41] miles from here. U my job is to keep [26:43] employees working and uh putting food on [26:47] the family's tables. Us being locally [26:49] based I think is a a huge advantage for [26:52] the the district to take in realization [26:54] that there are going to be emergencies [26:57] on this job and this job is going to run [27:00] in well over a year. Um we always finish [27:03] our projects on time, usually early. Um, [27:08] I appreciate the board taking the time [27:09] to listen to our protest on everything [27:13] we did was legit. I mean, we made a few [27:16] clerical errors. We're all human. We all [27:18] make mistakes, right? I had to hire this [27:21] kid because we got busy out here to [27:22] start estimating. He's only been doing [27:24] it for four months. Grabbed the wrong [27:26] paper, scanned it the wrong way, you [27:29] know, and that's the bottom line, you [27:31] know. I mean, we're a legit company. [27:33] We've been doing this a long time. I put [27:34] in miles and miles of pipe. Um, we have [27:38] 25 based employees out here. I hired [27:40] Dave Herrera behind me. He runs our [27:43] India office. Um, he's been with me over [27:46] 10 years. The longevity of the people [27:48] that work for me shows the character of [27:50] how we run our company. And, um, I just [27:53] think that [27:55] it's going to be very advantageous [27:58] for the district to use a local [28:01] contractor. This isn't a two month, one [28:04] month job. We know emergencies are going [28:06] to come up. You know, we're working in [28:08] the streets. It's not like we're working [28:09] in fields. We're going to have ponds [28:11] with traffic control. People are going [28:13] to run over the traffic control. There's [28:14] going to be calls at night because [28:16] somebody ran into a ditch or somebody [28:18] did something, you know, [28:21] on characteristic. So, if you look at [28:25] that, you know, we're a 10 15 minute [28:27] response compared to depending on [28:29] traffic, two, three hour response. Um, [28:33] so just appreciate you taking the time [28:35] to listen to us and consider that, you [28:37] know, we use a local based sub on a on a [28:40] bid that was submitted correctly but [28:44] incorrectly because of a few [28:47] unexperienced [28:49] um errors that he made trying to submit [28:52] the bid. So, thank you for your time. [28:55] >> Thank you. [28:59] And that was the last speaker card that [29:01] I had. [29:02] >> Okay. Um, [29:05] » Okay. Um, [29:05] we don't have anybody from the um [29:09] other side. Domingus. [29:14] » I guess I have a question that was [29:16] raised. I still feel like our hands are [29:19] tied up. [29:22] >> Oh, you're right. God, it goes on and [29:25] » Oh, you're right. God, it goes on and [29:25] off by itself. [29:27] It went back on without touching it. [29:29] Good for that. [29:30] >> But we did hear um from the first [29:34] » But we did hear um from the first [29:34] presenter, Mr. Anderson, [29:36] that even though the bid differential is [29:39] about half a million dollars, the actual [29:41] cost differential is more like $1.6 [29:43] million. I don't understand how that's [29:45] possible. [29:46] >> Um perhaps he's referring to the [29:48] » Um perhaps he's referring to the [29:48] engineers estimate. Um for this project, [29:50] we budgeted 11,930,000. [29:54] So, a majority of the bids did come in [29:56] significantly lower than what we [29:58] originally estimated. Um, and yes, it is [30:00] correct. TB's bid is certainly the [30:03] lowest. Um, but I think from [snorts] [30:05] the staff perspective, the bidding [30:07] documents are the first representation [30:09] of the contractor and if there's this [30:10] many inconsistencies, it does raise [30:12] concerns for the project moving forward. [30:15] Um, because this is we have to hold [30:17] everyone accountable to the same level. [30:19] Um, and since we did have a bid protest [30:21] that identified the same discrepancies, [30:23] in fact, missed a few that even we had [30:26] caught, um, I think it does raise some [30:28] questions moving forward on the setting [30:30] of precedents [30:31] >> just because they're the lowest, [30:33] » just because they're the lowest, [30:33] >> right? No, I understand. [30:35] » right? No, I understand. [30:35] >> But our our hands are not tied, John. [30:37] » But our our hands are not tied, John. [30:37] They're not tied. I mean, it someone has [30:41] >> brought this to our attention, which we [30:43] » brought this to our attention, which we [30:43] already knew about. [30:44] >> It's our prerogative to to um disregard [30:48] » It's our prerogative to to um disregard [30:48] that. Now, we are risking that Dominguez [30:51] would come back and sue us, but that [30:54] would be the power of this board. Uh, [30:56] the risk that we take. [30:58] >> And if I may, um, [clears throat] [31:01] » And if I may, um, [clears throat] [31:01] the reason that the other protest wasn't [31:03] being heard is because we had [31:05] recommended that it be mute because we [31:07] had already made the same conclusions. [31:09] If it's the board wishes to not award [31:11] the contract uh today or to award it to [31:14] the lowest bidder, we would have my [31:16] recommendation would be we be that we [31:17] come back because the recommendation was [31:20] not to go with TBU. So we'd have to [31:22] reassess what that recommendation would [31:24] be and number two there there would be a [31:26] need to provide uh Dominguez the right [31:28] to to uh speak on their protest because [31:32] then at that point it wouldn't be moot. [31:34] So uh it' be a number of steps before I [31:39] would recommend that we just go with the [31:41] lowest or do something else completely. [31:44] >> I guess I would like to know what um of [31:48] » I guess I would like to know what um of [31:48] all the inconsist inconsistencies with [31:52] the bid is Jeff for you to opine uh how [31:57] they fall into the category of material [32:01] deviations from the bid. In other words, [32:04] u you know, if they're nonmaterial, then [32:07] we could accept the bid, but how are [32:09] these issues uh material in terms of u [32:13] moving forward with this bid? [32:16] >> These errors deal with being held to [32:19] » These errors deal with being held to [32:19] their bid. And even though it might not [32:21] be considered a large part of it by not [32:24] uh having these documents uh submitted [32:27] appropriately, the lowest bidder could [32:29] say that they're not legally bound to [32:31] their bid because they didn't provide [32:32] the appropriate acknowledgement, didn't [32:34] provide the appropriate certificates. So [32:37] what the law says is that if the lowest [32:39] bidder didn't make these these [32:41] representations or submit these written [32:44] certifications and they could have [32:46] gotten out of their bid because they [32:47] didn't because they're not bound to it. [32:49] I'm not saying they would do that [32:50] obviously, but that's what the law has [32:52] concluded that it may be missing an an [32:55] acknowledgement, but it's something [32:57] that's deemed their bid that they're not [32:59] legally held to it and they could have [33:01] gotten out of it. And because of that [33:05] issue of being held to their bid, even [33:07] though it might be a document or two, [33:09] it's an acknowledgement that they're [33:10] bound to their bid. And the law says [33:13] because they're not legally bound to [33:14] their bid, that would have given them an [33:16] advantage. I realize that may not be the [33:18] case here or that it doesn't make a [33:20] whole lot of sense, but from a legal [33:22] point of view, being bound to your bid, [33:24] if you're not bound to your bid, you can [33:26] get out of it. And that would have [33:27] provided an advantage if the lowest [33:29] bidder had decided not to move forward. [33:31] So, it's being held to the bid legally, [33:35] which is the issue. [33:37] >> And yet here they are arguing that [33:40] » And yet here they are arguing that [33:40] they're they want to be held to the bid, [33:42] right? [33:43] >> Yeah. you know I think material [33:45] » Yeah. you know I think material [33:45] >> I think what um you know just to provide [33:48] » I think what um you know just to provide [33:48] an example because I mean we all look at [33:50] the bid you know the bids that come in [33:53] right and [33:55] overall there the next lowest bidder [33:58] wasn't that much higher compared to some [34:00] of the other biders and I would say if [34:03] you know let's say that the lowest [34:04] bidder who may have had some some [34:07] problems with with their bid being [34:09] accepted let's say they come in at 10 [34:11] million and all the other bids come in [34:13] over 20. [34:15] >> I mean, that would give them an [34:16] » I mean, that would give them an [34:16] opportunity to look at and go, "Wow, did [34:18] we miss something?" Right? I mean, is [34:20] there is there maybe this is not good [34:23] for us and we wouldn't be able to hold [34:25] them to that $10 million, which in that [34:28] example would be too low uh because uh [34:32] because they would have these material [34:35] or, you know, clerical errors that give [34:37] them legally the ability to back out of [34:40] it. I mean, it gives them a second look [34:42] or a second bite at the apple that I [34:43] think that Jeff's trying to [34:45] >> Yes, exactly. [34:45] » Yes, exactly. [34:45] >> trying to The fact that these other bids [34:48] » trying to The fact that these other bids [34:48] were not that much higher, you know, 5% [34:50] or or whatever, [34:52] >> um, makes that makes this example seem [34:56] » um, makes that makes this example seem [34:56] maybe a little less clear-cut. [35:00] >> Um, [35:03] » Um, [35:03] I just feel that it's not very material. [35:06] >> I feel the same. It's not it's it's it's [35:08] » I feel the same. It's not it's it's it's [35:08] a minor thing and and we're and I [35:10] understand but I do think that [35:15] we we have some some uh we can we can we [35:19] can pivot. I think we can under under [35:22] our authorization. [35:24] I don't think it's as clearcut. This is [35:26] a very m immaterial thing. [35:29] >> Hey John, can I ask a question? [35:30] » Hey John, can I ask a question? [35:30] >> Yeah. Yeah. Go ahead John. [35:32] » Yeah. Yeah. Go ahead John. [35:32] >> Can you hear me? Okay. [35:33] » Can you hear me? Okay. [35:33] >> Yes. [35:34] » Yes. [35:34] >> Hey, I'm just curious just as a matter [35:35] » Hey, I'm just curious just as a matter [35:35] of information. I know it's not going to [35:37] be a decisive uh matter, but I'm just [35:40] curious about the the differences [35:43] between the two firms [35:46] and um whether or not they have any um [35:50] disadvantaged business enterprises. I [35:53] noticed that in I think in the staff [35:55] report I read that Dominguez does not, [35:58] but I'm curious about TBU. Can staff [36:01] answer that? [36:03] >> Um I believe that both Dominguez and TBU [36:05] » Um I believe that both Dominguez and TBU [36:05] did. I don't know if TBU Yeah, we [36:08] attached the the form um for Dominguez [36:12] in the bid package. It did identify that [36:14] they they are DB and they attached their [36:16] certificates as well. [36:18] [snorts] [36:19] >> I'm sorry, that was for Dominguez. [36:21] » I'm sorry, that was for Dominguez. [36:21] >> Yeah, Dominguez specifically and and TBU [36:24] » Yeah, Dominguez specifically and and TBU [36:24] and the audience confirmed that they [36:26] have it as well. [36:27] >> So, they both do, [36:28] » So, they both do, [36:28] >> correct? [36:30] » correct? [36:30] >> Okay, great. Thank you. Then I have just [36:31] » Okay, great. Thank you. Then I have just [36:32] one one other minor question, John. If [36:35] if the board decides to go forward with [36:37] the with um with Dominguez, [36:42] um it seems awkward that we would [36:46] u award a contract or somebody and then [36:50] um and then deal with their their [36:52] protest. Wouldn't it be easier for them [36:54] just to withdraw their protest if [36:57] they're awarded the bid? [37:00] That's what the recommendation is is [37:01] that the bid protest would be moot if we [37:04] award it to Domingus, [37:06] >> right? [37:07] » right? [37:07] But if we're going [37:08] >> in any event, I agree if if if we're not [37:11] » in any event, I agree if if if we're not [37:11] going to award this to Domingus today [37:15] that especially based on the public [37:17] comment that was critical of Domingus [37:22] and the fact that we've already [37:24] published that their bid protest was [37:26] moot. We need to give them a chance to [37:28] come in and talk to us. [37:29] >> Correct. [37:30] » Correct. [37:30] >> Yeah. I mean, we can't do this today. [37:33] » Yeah. I mean, we can't do this today. [37:33] Mhm. [37:35] >> Um, so, [37:36] » Um, so, [37:36] >> you know, I'd like to hear, you know, [37:38] » you know, I'd like to hear, you know, [37:38] how how bad they are because we heard [37:41] today that they're pretty bad and I [37:43] don't think that they may not be true, [37:45] you know. [37:46] >> So, the recommendation could be to table [37:48] » So, the recommendation could be to table [37:48] this item to the next board [snorts] [37:51] meeting or to a to the next board [37:54] meeting that is practical [37:56] uh to hear the protests of the second [37:58] lowest bidder. [38:01] I didn't I didn't hear that they were [38:02] bad. [38:03] >> Well, that they would their response [38:04] » Well, that they would their response [38:04] time would be um significantly longer. [38:08] >> I think that that was just a [38:10] » I think that that was just a [38:10] >> I think that's a projection. They they [38:12] » I think that's a projection. They they [38:12] do not um they're not based out of here. [38:14] Um they're I believe that they're based [38:16] out of Orange County. Um and so TBDU was [38:19] projecting that they wouldn't be as [38:21] responsive because they're not based out [38:22] of [38:22] >> Well, I understand that, but I think [38:23] » Well, I understand that, but I think [38:24] they would have they should have an [38:25] opportunity to tell us what their [38:26] strengths are, too. So by having [38:29] >> it's not a fair fight if one's here and [38:31] » it's not a fair fight if one's here and [38:31] the other one's not. [38:32] >> So by having this item table to the next [38:35] » So by having this item table to the next [38:35] meeting or the next available meeting [38:36] then we're not you're not considering [38:39] the protest of the second lowest better [38:41] moot. In fact you want to hear that [38:43] protest before you make a decision. [38:46] >> So let me interject here for a moment. [38:48] » So let me interject here for a moment. [38:48] Um this was an IFB an invitation for [38:51] bids. It's not a request for proposals. [38:56] So technically we're not able to engage [39:00] in conversations [39:03] um with the biders to allow them the [39:06] opportunity to expand upon um what it is [39:10] they submitted. An IFB an invitation for [39:13] bids is based solely on the submittal [39:15] process. So if we allow Dominguez to [39:18] come in and explain their position, [39:20] you're kind of opening the door for [39:22] everybody that participated in [39:23] responding to do the same thing. And [39:26] that's not what the process is intended [39:28] to provide. Different for an RFP where [39:32] you basically are soliciting uh a [39:36] proposal and then there are [39:37] circumstances where you can engage with [39:39] the proposers to clarify their bids. [39:42] That's not true with the process that we [39:45] used here. So, I'm I'm just providing [39:48] some cautionary advice that, you know, [39:51] we're saying we're going to allow [39:53] Dominguez to come in and explain [39:54] themselves when [39:57] >> that's not necessarily. So in in in [40:00] » that's not necessarily. So in in in [40:00] response to that, Jim, I I would say if [40:03] the uh if we do this and Dominguez comes [40:07] in that they should stick strictly to [40:10] the issues of whether the [40:13] >> um uh deviations are material or not [40:16] » um uh deviations are material or not [40:16] material and [40:19] yeah so so a couple things. One is there [40:21] was a deadline for any bidder to submit [40:24] a bid protest and that's expired. So [40:26] this wouldn't be reopening to all the [40:27] other vendors to come in. Number two, uh [40:30] and this happens a lot is there's a bid [40:33] protest or two, the people who represent [40:36] those contractors can come and speak to [40:38] the protest to Director Nelson's point, [40:41] not to the response times or the quality [40:44] of work or anything like that. So it's [40:47] up to this board to award the contract. [40:50] If there are protests, you have the [40:52] right to consider those protests based [40:54] on what those protests are in terms of [40:56] the materiality or whatever they want to [40:59] state say in their protest when they [41:02] come to present. It's it's not reopening [41:04] the bid or talking about response times [41:07] or history of the contractors. It's [41:09] speaking to the protest. [41:13] » I just think we owe it to the rateayers [41:15] to save the $600,000 and to use a local [41:18] company. I just I think it that it's not [41:20] material. So if this was a material [41:22] thing, we've seen this before where [41:25] we've had to go lower, but there were [41:27] some big problems with the bid. Okay, [41:30] big problems. This is a scanning issue. [41:33] This is a few little some paperwork. So [41:36] >> if I can clarify, it's not simply a [41:38] » if I can clarify, it's not simply a [41:38] scanning issue. There were multiple [41:40] discrepancies with the bid, including [41:42] the bid information forms not being [41:43] completed. The nonclusion affidavit was [41:46] signed by um the estimator, but the not [41:50] notorized form was for a different [41:52] person on two completely different [41:54] dates. So, as we delve into it, and we [41:56] didn't list every single thing that was [41:58] wrong with the bid, but this isn't one [42:00] administrative issue. It's a bid that [42:03] wasn't completed correctly, and I think [42:05] TBU acknowledged that today in that, [42:08] yeah, it it it's not clean, it's not [42:10] tight, and we had a bid protest. And so [42:13] to look past this and say, "Well, we're [42:15] just going to award it based on the [42:16] lowest fee," I really do think that's [42:19] going to set a bad precedence for us [42:20] moving forward when there's other biders [42:22] that are going to have the same [42:23] situation presumably moving forward. [42:25] This is not normal for us. We do not see [42:28] this on our bids, particularly the [42:30] lowest bid, and that's where our [42:32] recommendation comes from. Um, and [42:34] that's why we consulted with BBK even [42:36] before we received the bid protest. [42:40] >> Okay. Thanks for that. and and I you [42:42] » Okay. Thanks for that. and and I you [42:42] know [42:44] Dominguez is going to have a pretty [42:46] strong case I think [42:49] because because we have a process that [42:51] we've identified and and they followed [42:53] it and the other ones didn't [42:56] you know [42:57] >> have we used Domingus before? [42:59] » have we used Domingus before? [42:59] >> We have not um other agencies um [43:03] » We have not um other agencies um [43:03] Eastern's worked with them but not [43:06] >> and we haven't used TBU before either. [43:07] » and we haven't used TBU before either. [43:07] Um I don't believe directly but I [43:09] believe they do developer work if I'm [43:11] not mistaken. [43:13] >> I think they're doing all the patina. [43:17] » Yeah. [43:20] >> Well, all right. Is there's I guess two [43:22] » Well, all right. Is there's I guess two [43:22] different directions we can go here. One [43:25] is we can take action [43:27] and two is we can table it for a next [43:32] for a future meeting. [43:33] >> From a from my point of view as as legal [43:35] » From a from my point of view as as legal [43:35] counsel I think you have two options. [43:37] One is to award the contract to [43:39] Dominguez or two to table the matter to [43:43] bring it back for Dominguez to speak to [43:46] their bid protest which is also in your [43:48] packet [43:52] » making a table. [43:56] » So if Dominguez comes in they really [43:59] can't say more than what they've said in [44:01] their letter and you've already got the [44:03] letter right. I think they can address [44:06] the items that were brought up today. [44:09] Couldn't they do that? [44:11] >> That those are not that deals with No, [44:15] » That those are not that deals with No, [44:15] because the the protest is whether or [44:17] not the bid was submitted under the law [44:20] correctly. So they they can get up and [44:23] speak about response times, but that's [44:24] not something from a legal point of view [44:26] that the board can take into [44:27] consideration. It's whether or not [44:29] there's a valid bid protest. And if you [44:31] want to hear from the protester who was [44:33] the second lowest bid, then you have a [44:35] right to do that obviously. [44:37] >> Could could we hear more from you like [44:38] » Could could we hear more from you like [44:38] in close session from other from um your [44:41] other colleagues regarding this protest [44:43] letter to the fact of the material [44:46] deviation and getting more into that [44:48] conversation? [44:49] >> That was going to be my recommendation [44:51] » That was going to be my recommendation [44:51] at some point as well. [44:53] >> Jeeoff, doesn't this get into [44:54] » Jeeoff, doesn't this get into [44:54] responsiveness versus responsibility? [44:57] >> Exactly. If you start going to [44:59] » Exactly. If you start going to [44:59] responsibility, which are the issues [45:01] that you're now asking Dominguez to come [45:03] in and address, that's a whole process [45:06] in itself, a whole different legal [45:08] process. And that requires a public [45:10] hearing and that requires um it's a very [45:14] len it can be a very lengthy process. [45:16] >> Well, and so there's two things. [45:19] » Well, and so there's two things. [45:19] Responsiveness. [45:21] Did you submit a bid that is responsive [45:24] to all the requirements? [45:25] what we're considering here that all the [45:28] items were not submitted in complete [45:31] responsiveness to the bid, [45:32] >> right? [45:33] » right? [45:33] >> And responsible is if we think the [45:35] » And responsible is if we think the [45:35] lowest bidder can't do the job, right? [45:37] >> We're kind of in the middle here. It's [45:38] » We're kind of in the middle here. It's [45:38] not that we're saying that they can't [45:40] ultimately do the job, but we're saying [45:42] it's not responsive, but they have [45:44] spoken to issues of how they would be a [45:47] better contractor, which they certainly [45:48] have a right to speak to, but it's not [45:50] something you can legally decide on. [45:52] >> Right. Right. So, that's why We are [45:55] » Right. Right. So, that's why We are [45:55] addressing responsiveness. [45:58] I [45:58] >> I get it. And so the staff and the [46:01] » I get it. And so the staff and the [46:01] protests both identified the [46:02] nonresponsive [46:05] >> bid of TBU and I don't think that that [46:07] » bid of TBU and I don't think that that [46:07] has been um argued today, [46:10] >> right? And [46:11] » right? And [46:11] >> I think everyone agrees it was [46:12] » I think everyone agrees it was [46:12] non-responsive. So what so [46:14] >> so what are we doing here? [46:16] » so what are we doing here? [46:16] >> Well, exactly. Why? Then we need to go [46:19] » Well, exactly. Why? Then we need to go [46:19] with staff recommendation because staff [46:22] is saying the bid was nonresponsive [46:25] and we are saying that we are [46:28] recommending to go with the second low [46:30] bid. [46:31] >> Right. [46:36] » Again I want to remind everybody this is [46:38] Sun City Palm Desert. This is an [46:40] extremely important project. We are so [46:43] fortunate that we got bids at the at the [46:46] price that we got, right? [46:48] >> Because we were expecting bids to come [46:50] » Because we were expecting bids to come [46:50] in around 14 or 15 million. We're at 10 [46:53] million. [46:54] >> Yeah. Yeah. So So, and some did come in [46:57] » Yeah. Yeah. So So, and some did come in [46:57] higher, [46:58] >> right? [46:58] » right? [46:58] >> Yeah. So, uh, we have a motion to table. [47:03] » Yeah. So, uh, we have a motion to table. [47:03] We do not have a second on that motion [47:05] yet that I've heard. [47:10] I I still wanted to hear more about I [47:13] get your staff's recommendation. You've [47:15] made a determination that um it's [47:17] nonresponsive, [47:20] but I'm I'm I'm still trying to figure [47:22] out more the material versus immaterial. [47:24] like what would be a an example of uh [47:28] something that as staff you would be [47:29] able to say, you know, we can kind of um [47:33] >> an immaterial deviation. [47:36] » an immaterial deviation. [47:36] >> Um [47:38] » Um [47:38] >> putting something on the wrong line, but [47:39] » putting something on the wrong line, but [47:39] the information is still there. [47:41] Something like that. Right [47:42] >> here, the information wasn't there. [47:44] » here, the information wasn't there. [47:44] That's the difference. [47:44] >> And signatures were different. [47:47] » And signatures were different. [47:47] signatures on a notary versus the page [47:49] that they were notorizing. [47:52] >> Is immaterial immaterial [47:56] go beyond the bid amounts that are that [47:59] are on the bid form or is it or is it [48:03] more so does it put attention on the [48:05] actual bid items so that you [48:07] >> material? [48:08] » material? [48:08] >> Yeah. Like what [48:10] » Yeah. Like what [48:10] >> it's the items that we've that we've [48:12] » it's the items that we've that we've [48:12] explained here. I mean it doesn't have [48:14] anything to do with the numbers or the [48:16] bid because those those um [48:21] uh we didn't have an issue. So for [48:23] example, the certificates for the fleet [48:25] that the letter seems to have then kind [48:27] of provided instead of well here's the [48:29] searchs, [48:30] >> right? [48:31] » right? [48:31] >> You're you're considering that to be [48:32] » You're you're considering that to be [48:32] material, [48:33] >> right? Because that is a specification [48:35] » right? Because that is a specification [48:35] requirement. That is a bid requirement. [48:37] You submit these forms [48:39] with the bid. [48:41] >> I think too if we start allowing people [48:43] » I think too if we start allowing people [48:43] to submit these documents post bid, at [48:46] what point does that stop? Because what [48:48] now to your point what's material versus [48:50] immaterial? The bid was not complete. [48:53] TBU acknowledges that. We have a bid [48:55] protest that outlines everything that [48:57] was incomplete. We have our own [48:58] independent review that was reviewed by [49:00] BBK that also acknowledges how [49:03] incomplete it was. It's not one item [49:05] that's a material immaterial deviation [49:07] to your question, right? What is an [49:10] often it's one item. We've seen that [49:12] where it's been [49:13] >> maybe a date. I think there was one [49:15] » maybe a date. I think there was one [49:15] where it was supposed to be the 29th. It [49:16] was the 27th. That was an administrative [49:18] error. [49:20] This is not. [49:21] >> And to Jim's point, when you have a [49:25] » And to Jim's point, when you have a [49:25] request for bid like this, a public bid, [49:29] we don't have discretion. [49:32] You either meet the contract [49:34] requirements or you don't. Versus with [49:36] an RFP, that's where you have the [49:39] ability to have some discretion and to [49:40] negotiate. But if you start saying, "Oh, [49:44] well, we'll let those certificates slide [49:46] on this one." Well, that's being [49:48] discreet. That's having discretion. [49:51] And and then to Sabrina's point, what do [49:55] we do the next time? We have to, you [49:57] know, it's it's this moving target all [49:59] the time. With bids, there's no moving [50:02] target. It is what it is. It's per the [50:05] specifications. It's a public bid. [50:07] [laughter] Either they submit the [50:08] documents properly or they don't. [50:13] Well, [50:14] >> I think it's fair to say it's not just a [50:15] » I think it's fair to say it's not just a [50:15] scanning issue. Correct. [50:19] >> So, u we have a motion. At what point [50:21] » So, u we have a motion. At what point [50:22] does the motion die for lack of a [50:23] second? [50:24] >> I'll second. We've never had this happen [50:26] » I'll second. We've never had this happen [50:26] before. All right. We have a second. So, [50:29] the motion is to table this item. One [50:31] one other question I have timing wise. [50:35] If let's say it sounds like we may have [50:39] um potential litigation here. Maybe this [50:42] is something that we can help we can get [50:45] more explanation for in close session. [50:47] >> Yeah, exactly. [50:48] » Yeah, exactly. [50:48] >> I mean, if we do that, that would be at [50:50] » I mean, if we do that, that would be at [50:50] the next meeting, which would be take us [50:52] to the first meeting in February for for [50:55] further action. [50:56] >> We open bids October 2nd, I believe. [51:00] » We open bids October 2nd, I believe. [51:00] >> So, at what point do these bids expire? [51:02] » So, at what point do these bids expire? [51:02] >> Uh, November 20th, [51:04] » Uh, November 20th, [51:04] >> 60 days next week. [51:06] » 60 days next week. [51:06] >> So, these bids will expire. Mhm. [51:08] » So, these bids will expire. Mhm. [51:08] >> So either we take action today or or the [51:10] » So either we take action today or or the [51:10] whole thing just [51:12] >> goes. [51:12] » goes. [51:12] >> Well, we can go back and ask the [51:13] » Well, we can go back and ask the [51:14] contractors to extend their bids, but [51:15] that's a market risk. [51:18] >> We don't know how we don't know what [51:19] » We don't know how we don't know what [51:19] their subcontractors are facing as far [51:21] as material prices or [51:23] >> if if we vote if we vote and the and the [51:26] » if if we vote if we vote and the and the [51:26] vote fails to table, can we take further [51:28] action and approve the stack [51:30] recommendation today? [51:31] >> Yes. Yes, of course. [51:32] » Yes. Yes, of course. [51:32] >> All right. [51:34] » All right. [51:34] and a close session uh to explain [51:39] in graphic detail what the legal [51:42] implications would be in this [51:45] recommendation of not going with the [51:47] with the with the recommended [51:49] contractor. We could certainly do that [51:51] before any action taken by the board. [51:53] But I mean it's as I said before that I [51:56] think it's been well explained what the [51:58] legal exposure would be. [51:59] >> Right. I think it's significant. [52:04] So, you've got a motion and a second to [52:05] table. [52:06] >> All right. So, are we ready for a roll [52:07] » All right. So, are we ready for a roll [52:08] call vote? [52:09] >> The action would be to mot the item in [52:12] » The action would be to mot the item in [52:12] order to then consider the second lowest [52:14] biders protest at the better future [52:16] meeting. [52:16] >> Are you okay to vote, John? On on the [52:18] » Are you okay to vote, John? On on the [52:18] line. [52:20] >> Yes. [52:20] » Yes. [52:20] >> All right. All right. Let's go to the [52:22] » All right. All right. Let's go to the [52:22] roll call vote then, please. [52:23] >> President Pal, [52:24] » President Pal, [52:24] >> no. [52:25] » no. [52:25] >> Vice President Estrada? [52:26] » Vice President Estrada? [52:26] >> Yes. [52:27] » Yes. [52:27] >> Director Biano? [52:29] » Director Biano? [52:29] >> Yes. [52:30] » Yes. [52:30] >> Director Aguilar? [52:32] » Director Aguilar? [52:32] No [52:33] >> director Nelson. [52:34] » director Nelson. [52:34] >> No. [52:35] » No. [52:35] >> Okay. Motion failed. [52:36] » Okay. Motion failed. [52:36] >> Okay. So, the motion failed [52:38] » Okay. So, the motion failed [52:38] and I'm going to move that we accept [52:42] staff recommendation on this item. [52:46] >> I would second that. [52:48] » I would second that. [52:48] >> Okay. [52:49] » Okay. [52:49] Any other discussion? [52:54] Uh, roll call, please. [52:55] >> President Pal. [52:56] » President Pal. [52:56] >> I. [52:57] » I. [52:57] >> Vice President Estrada. [52:58] » Vice President Estrada. [52:58] >> No. [52:59] » No. [52:59] >> Director Biano. [52:59] » Director Biano. [53:00] >> No. Director Aguular. [53:02] » No. Director Aguular. [53:02] >> Yes. [53:02] » Yes. [53:02] >> And Director Nelson. [53:03] » And Director Nelson. [53:03] >> Hi. [53:04] » Hi. [53:04] >> Thank you. 32. [53:05] » Thank you. 32. [53:05] >> Pass. 32. [53:06] » Pass. 32. [53:06] >> The rare split vote. [53:09] » The rare split vote. [53:09] >> I I I don't like that, but it is what it [53:11] » I I I don't like that, but it is what it [53:11] is. [53:12] >> Well, that's uh I appreciate the [53:15] » Well, that's uh I appreciate the [53:15] contractors being here locally. [53:17] >> So, thank you for your interest, and I [53:19] » So, thank you for your interest, and I [53:19] hope that you continue to [snorts] [53:22] >> submit bids. [53:23] » submit bids. [53:23] >> Yeah. [53:23] » Yeah. [53:23] >> Thank you. [53:23] » Thank you. [53:24] >> Thanks for coming in. [53:27] » Thanks for coming in. [53:27] All [53:30] right. Where are we? The [53:36] » This is the uh Kora Constructors, [53:39] Armando 8. Good morning. [53:42] >> Good morning, President Pow, members of [53:43] » Good morning, President Pow, members of [53:43] the board, audience, and fellow staff. [53:46] Uh my name for the record is Armando [53:48] Rodriguez with the engineering [53:49] department. Uh the purpose of this borch [53:51] action item is to award a construction [53:53] contract to core constructors as the [53:56] lowest responsible and responsive bid. I [53:59] got nervous saying that right now. [54:01] >> Yeah, those words matter. [54:02] » Yeah, those words matter. [54:02] >> Yes. Amount of 1,949,949 [54:07] by authorizing general manager to secure [54:09] a contract for the construction of the [54:11] station 5512 [54:13] um and lift station 8107 [54:16] upgrade project specifications 2024-12. [54:19] We're also seeking soft cost um needed [54:22] during the construction um and for CD [54:26] project management 30 about 30,000 [54:29] engineering support services during [54:31] construction about 127,000 and then so [54:34] compaction testing with RMA group of [54:36] about 20,000 and then we also had to pay [54:39] for our ongoing inspection of the [54:41] project of about 115,000. So the total [54:43] request or in a contingency of about [54:45] 98,000. Uh so the total request today is [54:48] $2,33644. [54:53] Um what are we doing here? What what is [54:56] it that we're trying to do with lift [54:57] station 5512 which is right next to the [54:59] Home Depot at Jefferson Highway 111. And [55:02] also what are we doing here with lift [55:03] station 8107 which is above Avenue 402nd [55:06] just south of Shadow Hills uh Golf Club. [55:09] Well, we we need reinvestment uh of [55:12] these two lift stations. Uh some of the [55:14] order control and the liner are [55:17] dilapitated. They're not actually [55:19] functioning. And so we have to reinvest. [55:21] These are infrastructure. These two [55:23] infrastructure are more than 16 years [55:25] old. And so we just need to be able to [55:27] reestablish uh the resilency and [55:30] reliability of both the um chemical [55:34] order treatment and the wet well. The [55:38] great thing as we do this uh we have an [55:40] opportunity here to move away from [55:42] chemical odor control. Um there is a [55:45] better process more efficient process [55:47] and that is to do biological treatment [55:48] control and I think this is a great [55:51] opportunity now that it has dilapitated [55:53] and it's aged out it's time to improve [55:55] it. Um the project was duly advertised [55:59] on November 18th uh through planet bids. [56:02] The junior's estimate was 2.1 million. [56:06] And on December 18th [56:09] uh we received a total of four bids [56:11] ranging of 1.9 million to about 2.9 [56:14] million. There's about a million dollar [56:16] spread on those four bids. Uh stuff has [56:19] staff has reviewed uh the lowest bidder [56:23] core constructions. We have looked at [56:25] their bid amount. Uh we found no [56:27] material mistakes. Um or and uh so we're [56:31] therefore recommending the construction [56:33] to contract to core construction in that [56:36] amount of $1,949. [56:40] Um the project um it is budgeted within [56:43] sanitation fiscal year budget of $2.1 [56:46] million using PGO funding. We estimate [56:50] that about 1.2 2 million will be spent [56:51] this year and then the rest the other [56:54] 1.2 million will be spent uh for next [56:56] fiscal year budget for next fiscal year. [56:59] I'll pause here to see if there's any [57:01] questions associated with this project [57:02] that I might might answer. [57:04] >> Thank you. [57:10] » Make a motion to approve u another local [57:14] contractor. [57:15] >> Local contractor. Yes. [57:16] » Local contractor. Yes. [57:16] >> Yeah. So, uh, happy one made it through. [57:19] » Yeah. So, uh, happy one made it through. [57:19] But, uh, yeah, they're they're great to [57:21] work with. Um, [57:23] good good presentation. [57:25] >> Thank you. [57:28] » Yes, [57:29] >> that was a motion to approve. Is there a [57:31] » that was a motion to approve. Is there a [57:31] second? [57:32] >> I'll second. [57:33] » I'll second. [57:33] >> Second. Any discussion? [57:37] » Second. Any discussion? [57:37] All of Oh, roll call, please. [57:39] >> President Pal. [57:41] » President Pal. [57:41] >> I. [57:41] » I. [57:41] >> Vice President Estrada. [57:43] » Vice President Estrada. [57:43] >> Yes. [57:43] » Yes. [57:43] >> Director Biano. [57:44] » Director Biano. [57:44] >> Hi. [57:44] » Hi. [57:44] >> Director Ailar. [57:46] » Director Ailar. [57:46] >> Yes. [snorts] and director Nelson. [57:47] » Yes. [snorts] and director Nelson. [57:47] >> Hi. [57:48] » Hi. [57:48] >> Thank you. 50. [57:49] » Thank you. 50. [57:49] >> That's 50. Thanks, Armando. On 8C, I [57:52] » That's 50. Thanks, Armando. On 8C, I [57:52] have a a financial interest in this item [57:55] and we'll be recusing and leaving the [57:57] room. So, Vice President Estrada, it's [58:00] all yours. [58:01] >> All right. Interesting project. [58:03] » All right. Interesting project. [58:04] >> Yes. Good morning, um, President Pal, [58:07] » Yes. Good morning, um, President Pal, [58:07] members of the board. Um, this morning, [58:09] I'm requesting the board's approval of [58:11] the water supply assessment for the [58:13] ranch at Madison project. [58:18] Here's a map of do uh project location. [58:21] It is located [58:23] um on Monroe Street and Jackson from [58:26] west to east and between avenues 52nd [58:29] and 54th north to south. Um the project [58:33] comprises [58:35] actually let me see here's the project [58:36] plan and this is a very conceptual plan [58:39] here that's proposing 85 uh residential [58:44] units of low density and medium density. [58:47] Uh a private short golf course and a [58:50] clubhouse that will feature dining [58:52] facilities and spaces for events and [58:54] various sports and leisure amenities. Um [58:58] and the breakdown are shown here. Um [59:02] residential building areas comprised of [59:04] 44,73 [59:07] uh square feet [59:09] >> acres [59:11] » acres [59:11] 173.8 8 acres, not square feet. [59:15] >> Oh, um, yeah, I was mentioning the [59:17] » Oh, um, yeah, I was mentioning the [59:17] non-residential building area, the 44,00 [59:20] >> Okay. [59:20] » Okay. [59:20] >> Uh, 73 square ft and land areas of [59:24] » Uh, 73 square ft and land areas of [59:24] course is about 174 acres. [59:29] Uh, projected total demand of this [59:32] project is 66 about 669 acre feet per [59:36] year. That's equivalent to 3.84 acre [59:40] feet per acre. Um indoor residential [59:43] demand is 10.47 acre feet per year in [59:47] the indoor commercial and industrial [59:49] demand is 18.42 [59:52] acre feet per year and the outdoor [59:53] irrigation demand is 31.93 [59:56] acre feet per year. The outdoor [59:59] recreation demand is 607.85 [1:00:04] acre feet per year and that's the bulk [1:00:05] of the uh projected water demand of the [1:00:08] project. [1:00:11] Um with that I would stop here for any [1:00:13] questions or comments. [1:00:15] >> Is the water use on the golf course how [1:00:17] » Is the water use on the golf course how [1:00:17] does that compare to golf courses that [1:00:19] we have currently? So this is the factor [1:00:22] that we use for project and as you know [1:00:24] we have certain uh target towards um the [1:00:29] incoming year on regulation of outdoor [1:00:32] usage and um this is the factor that we [1:00:36] use that's comparable to if not stricter [1:00:40] than the current uh out uses. So, we [1:00:43] look at the aggregate use of the [1:00:45] project, not the specific parts of the [1:00:47] project. And I think that's kind of [1:00:48] where Director Biano was going is, do we [1:00:51] have a way to compare the use on the [1:00:53] golf course to other golf courses? If [1:00:56] Olivia was here, she'd probably be able [1:00:58] to do that off the top of her head. [1:00:59] >> Yeah. [1:01:00] » Yeah. [1:01:00] >> Yeah. We'll take [laughter] a look at [1:01:01] » Yeah. We'll take [laughter] a look at [1:01:01] that and we'll get back to you. You [1:01:04] >> Yeah, I I have a question in kind of [1:01:05] » Yeah, I I have a question in kind of [1:01:05] related to that. I I think the 3.84 is a [1:01:09] is a metric that is a is a better [1:01:11] metric. uh from a project by project uh [1:01:17] uh analysis rather than the 660 [1:01:22] 69 acre feet on the project. I mean I'm [1:01:24] looking through all the other WSAs and [1:01:27] um you know there's some at you know [1:01:28] 5,000 uh acre feet. Um but to me it's [1:01:34] kind assessment should be u you know the [1:01:38] aggregate of the project and and so I [1:01:41] look at the 3.8 84. And to me, that [1:01:44] rings rather high in terms of what some [1:01:47] of the others that we've seen uh come [1:01:50] through. And although your list doesn't [1:01:52] have the um per foot, which I I would [1:01:56] like to get at some point, um but it [1:01:59] just seems high to me and and I, you [1:02:01] know, so that begs the question, is the [1:02:03] golf course, you know, significantly [1:02:06] impacting this whole project uh in [1:02:08] there? And you know, I I'm struggling [1:02:10] with that that amount. I thought our [1:02:12] ordinances would bring the member in in [1:02:16] the in the twos rather than the threes. [1:02:19] So, [1:02:21] I guess I'm, you know, I look at this [1:02:23] project and I'm thinking, wow, it's [1:02:25] pretty high water use. [1:02:28] >> You um sometimes report the [1:02:32] » You um sometimes report the [1:02:32] demand uh as a percentage of the [1:02:35] >> the plan increases. Yeah, you [1:02:38] » the plan increases. Yeah, you [1:02:38] >> that's the project is accounts for about [1:02:41] » that's the project is accounts for about [1:02:41] 1.34 of the total plan increases. And [1:02:44] you look at the attachment three, we [1:02:46] have all the projects listed. And what [1:02:48] is the p the percentage so far um of our [1:02:53] total uh projected water use by 2045. [1:02:57] And if this project is approved, we're [1:02:59] at 39% of the projected uh water use. [1:03:03] >> Okay, that's a that's a very nice um [1:03:05] » Okay, that's a that's a very nice um [1:03:06] >> Yes. Nice table. [1:03:07] » Yes. Nice table. [1:03:07] >> You all were curious. Oh, we keep [1:03:09] » You all were curious. Oh, we keep [1:03:09] approving this WSA, but where where are [1:03:11] we on the percentage? Have we exceeded [1:03:14] that amount? [1:03:15] >> So, we have a projection that takes us [1:03:17] » So, we have a projection that takes us [1:03:17] to 2045. [1:03:18] >> Yes. And right now, with all the [1:03:21] » Yes. And right now, with all the [1:03:21] projects approved, we're at 39%. [1:03:24] >> Is that projected demand? [1:03:26] » Is that projected demand? [1:03:26] >> So, that Thank you for this um table [1:03:29] » So, that Thank you for this um table [1:03:29] here. [1:03:30] >> Of course, staff will continue to update [1:03:32] » Of course, staff will continue to update [1:03:32] this table as we bring new WSAs for us [1:03:35] for your approval. You can see what it [1:03:37] is. [1:03:38] >> That's what that is. Yeah, [1:03:40] » That's what that is. Yeah, [1:03:40] that's currently [1:03:43] I I was just a little concerned because [1:03:44] that, you know, sitting on the golf and [1:03:47] water task force, there's a lot of golf [1:03:48] courses that are spending a lot of money [1:03:50] uh ripping out turf to try and at least [1:03:53] have some kind of desert landscape um [1:03:57] incorporated into their golf course. And [1:04:00] I didn't know how this compares to other [1:04:03] golf courses. Is it green grass from one [1:04:06] side or the other? Although that's not [1:04:07] our I mean that's not where this board [1:04:10] is elected to do is is decide that we [1:04:15] all we decide is do you meet our [1:04:17] criteria and [1:04:18] >> obviously this meets our criteria or you [1:04:20] » obviously this meets our criteria or you [1:04:20] wouldn't be here. [1:04:21] >> Right. And they also in included a plant [1:04:23] » Right. And they also in included a plant [1:04:24] pallet that's um desert friendly as well [1:04:27] in the WSA. [1:04:29] >> Yeah. So just from the chart you have up [1:04:31] » Yeah. So just from the chart you have up [1:04:31] here, it's 5.32 [1:04:33] acre feet per acre on the golf on the [1:04:36] golf course. [1:04:38] >> And I don't know how that compares [1:04:39] » And I don't know how that compares [1:04:39] >> Yeah. [1:04:40] » Yeah. [1:04:40] >> Yeah. [1:04:40] » Yeah. [1:04:40] >> Yeah. [1:04:40] » Yeah. [1:04:40] >> to others like [1:04:41] » to others like [1:04:41] >> to others. Yeah. [1:04:42] » to others. Yeah. [1:04:42] >> Yeah. I don't know if that's high or [1:04:44] » Yeah. I don't know if that's high or [1:04:44] >> low or [1:04:45] » low or [1:04:45] >> remember we had we had that chart they [1:04:47] » remember we had we had that chart they [1:04:47] gave us also at the [1:04:49] >> Yeah. They broke down the the um acre [1:04:53] » Yeah. They broke down the the um acre [1:04:53] feet per acre of each golf course. I [1:04:55] think is that what they're working on [1:04:56] too? Yeah, they're mapping [1:04:58] >> Jim. [1:04:59] » Jim. [1:05:00] >> Yes, I'm trying to pull up uh the last [1:05:03] » Yes, I'm trying to pull up uh the last [1:05:03] >> sub that um [1:05:06] » sub that um [1:05:06] >> yeah, on this project I mean the the [1:05:08] » yeah, on this project I mean the the [1:05:08] Gulf area um is 43% of the total project [1:05:13] which so that 5.3 has a greater impact [1:05:15] on on the total project. [1:05:20] » [snorts] [1:05:21] >> She doesn't have this was uh [1:05:25] » She doesn't have this was uh [1:05:26] Olivia's last for 2025. [1:05:29] So I don't have the one for 20, but this [1:05:31] is the acre foot per course and this is [1:05:32] the acre foot per hole. So it doesn't [1:05:36] >> So So Jim, you might want to mention [1:05:38] » So So Jim, you might want to mention [1:05:38] whatever numbers you're looking at. [1:05:40] Well, it's a table and it's got the ETO [1:05:43] um the evapo transpiration and golf [1:05:46] course water use for various months of [1:05:50] 2025. [1:05:51] Um this is just the one I pulled up. It [1:05:53] doesn't have November, December [1:05:55] >> acre feet per you don't know the acres. [1:05:59] » acre feet per you don't know the acres. [1:05:59] >> Yeah, [1:06:00] » Yeah, [1:06:00] >> but how big is a course typically like? [1:06:02] » but how big is a course typically like? [1:06:02] >> So this would be 2024 because this year [1:06:04] » So this would be 2024 because this year [1:06:04] is not finished, right? Total. So [1:06:07] >> the total acre foot for course, she [1:06:09] » the total acre foot for course, she [1:06:09] doesn't have a a total there or it is [1:06:12] acre foot [1:06:13] >> peru. [1:06:16] » Yeah. She doesn't have the acreage of [1:06:18] the course. [1:06:19] >> Yeah. [1:06:21] » Yeah. [1:06:21] >> Yeah. To compare course. [1:06:23] » Yeah. To compare course. [1:06:23] >> So not helpful at all. [1:06:25] » So not helpful at all. [1:06:25] >> No. [1:06:26] » No. [1:06:26] >> No. [laughter] [1:06:27] » No. [laughter] [1:06:28] >> But it was a good try though. [1:06:30] » But it was a good try though. [1:06:30] >> If she was here, she would [1:06:32] » If she was here, she would [1:06:32] >> she would not. [1:06:32] » she would not. [1:06:32] >> Yeah. Well, doc staff can definitely put [1:06:34] » Yeah. Well, doc staff can definitely put [1:06:34] something like this together for the [1:06:36] future WSA approval so that you could [1:06:39] see um how the project compares. [1:06:43] >> All right. Uh there not any further [1:06:45] » All right. Uh there not any further [1:06:45] comments, questions. Is there a motion [1:06:47] to approve? [1:06:57] Asking for a motion. [1:07:00] I think there might still be some [1:07:04] reviews and thoughts. [1:07:10] » I'm just concerned about the overall [1:07:12] water use on it. Um I mean I know we [1:07:14] don't we don't have I I think we have [1:07:17] discretion on projects uh in terms of [1:07:20] overall water use. Um I think this one's [1:07:23] high. [1:07:26] » Yeah, we have folks from the project [1:07:29] that are here to answer questions you [1:07:30] may have as well. [1:07:34] I got something. I don't know why it's [1:07:36] backwards. Golf course water use in acre [1:07:40] feet, but it's again not per acre. So, I [1:07:43] guess that doesn't help either. [1:07:48] I [1:07:48] >> think we're getting somebody on the line [1:07:49] » think we're getting somebody on the line [1:07:49] from the project team. [1:07:53] >> We do have Frank on the line. Frank, if [1:07:55] » We do have Frank on the line. Frank, if [1:07:55] you'd like to unmute yourself, if you [1:07:57] have any information you'd like to add [1:07:58] or make yourself available for any [1:07:59] questions to the board, you can do so at [1:08:01] this time. [1:08:03] >> Hi. Yes. Can you guys hear me? Okay. [1:08:05] » Hi. Yes. Can you guys hear me? Okay. [1:08:05] This is Frank Cahill with RTL. [1:08:08] >> Yes, we can hear you. [1:08:10] » Yes, we can hear you. [1:08:10] >> Yeah. Uh, I'm afraid I I I probably [1:08:13] » Yeah. Uh, I'm afraid I I I probably [1:08:13] can't answer as it were uh the [1:08:16] comparison to other golf courses, but I [1:08:18] I've um I could just reiterate that the [1:08:21] the amount of the increase here is about [1:08:24] 1% and and having um in the WSA it does [1:08:29] uh clearly go through um the the the [1:08:33] potential for future dry years, a single [1:08:36] dry year and then five dry years over [1:08:38] the next 20 year period up to 2045. [1:08:41] And it kind of uh it goes through and it [1:08:43] explains how if any of those uh dry [1:08:46] years were to happen uh how CVWD can [1:08:49] still produce the water um uh for this [1:08:52] golf course irrigation. And you you guys [1:08:55] are probably very familiar with this [1:08:56] from from previous WSAs, but um [1:08:59] basically I think the bottom line on the [1:09:01] WSA was that um CVWD has the the the [1:09:06] ability to to pump from the groundwater [1:09:08] basin. um if any of those um dry years [1:09:13] do happen and the overall impact of this [1:09:16] particular project is about 1% of the [1:09:18] increase. I think it's uh one and a [1:09:20] half% of the increase between now and [1:09:22] then. So that's all I could comment on. [1:09:25] I I I don't know the the actual um acre [1:09:28] feet per acre of other projects in the [1:09:30] locality to compare to. Do do do do do [1:09:33] do do do do do do do do do do do do do [1:09:33] do do do do do we know um it is this [1:09:36] actively farmed and do we know the [1:09:37] comparison of the current water demand [1:09:41] if this is being irrigated um in [1:09:44] comparison to the projected water demand [1:09:45] on this project [1:09:47] >> it's going to be lower no matter what [1:09:49] » it's going to be lower no matter what [1:09:49] >> it's going to be lower no matter what. [1:09:51] » it's going to be lower no matter what. [1:09:51] >> Yeah. [1:09:53] » Yeah. [1:09:53] >> So I that's a good thing right? [1:09:55] » So I that's a good thing right? [1:09:55] >> Yeah. [1:09:59] » I just don't know if we should [1:10:02] just the we should look at [1:10:04] >> what if if we table this does it have [1:10:07] » what if if we table this does it have [1:10:07] any sort of impact on your um on any of [1:10:10] your other approvals with with the [1:10:11] county or or does it have any sort of [1:10:13] impact on that? [1:10:16] >> Uh I think John is in the audience [1:10:18] » Uh I think John is in the audience [1:10:18] there. He could probably uh comment on [1:10:20] that better but but yes I think we were [1:10:22] uh hoping to get this done quickly so [1:10:24] that we can move forward with the other [1:10:27] approvals. But uh maybe John could [1:10:29] comment on that. [1:10:31] Hi John, would you please come up if you [1:10:33] could answer that question? This is this [1:10:35] completely independent of the county [1:10:37] process or do you need this checked off [1:10:39] or [1:10:40] >> Yeah, this is [1:10:41] » Yeah, this is [1:10:41] >> part of [1:10:41] » part of [1:10:41] >> if we can have you come up to the podium [1:10:43] » if we can have you come up to the podium [1:10:43] please. You can come up to this podium [1:10:44] as well. [1:10:44] >> The water supply assessment is part of [1:10:46] » The water supply assessment is part of [1:10:46] their squa their environmental document. [1:10:49] >> Um good morning John Gamlin with [1:10:51] » Um good morning John Gamlin with [1:10:51] Discovery Land Company. Um I do have if [1:10:54] you I'm sorry I do have the blue card if [1:10:57] you need it. [1:10:57] >> I'll take that after. [1:10:58] » I'll take that after. [1:10:58] >> Okay. Um I I am a senior vice president [1:11:02] » Okay. Um I I am a senior vice president [1:11:02] of development for Discovery and so yes [1:11:06] this is part of our environmental [1:11:09] process. We're in the midst of uh it's [1:11:11] imminent actually. We're submitting our [1:11:13] administrative draft EIR to the county [1:11:16] this week. Um so that will be in public [1:11:19] circulation probably within we hope [1:11:22] within six weeks. and the WSA is a uh [1:11:26] requirement of the EIR. So, the [1:11:29] information is in the EIR. [1:11:31] Um [1:11:33] I, you know, I'm sure we can probably [1:11:36] resolve some of the the questions um [1:11:39] with the engineer if you know if the if [1:11:41] the board isn't able to approve this [1:11:43] today. I I think that my long experience [1:11:46] in the valley, I think this golf course [1:11:47] is is no different than any other golf [1:11:50] course uh approved in the current um [1:11:53] setting in terms of the regulation and [1:11:56] it's water demand. I know there are [1:11:57] limitations on turf. I think it adheres [1:12:00] to all the the ordinance 1302 [1:12:02] requirements. [1:12:03] Um and then you know it is an aid plant [1:12:06] pallet. So, um, and it does intend to [1:12:10] use non-politable water sources that's [1:12:12] on the property today. A question was [1:12:14] asked about farming. Historically, [1:12:17] uh, of the 174 acres of the project [1:12:20] site, all but uh, 19 acres has been [1:12:24] farmed in recent times. And in fact, 100 [1:12:26] acres have been in crops as recently as [1:12:29] a year ago. So there is still active [1:12:32] farming under leaseolds that um we have [1:12:35] in place on the property. There's a 19 [1:12:38] acre date grove and about 100 acres [1:12:40] that's in [1:12:42] um vegetable production. There is 40 [1:12:44] acres that was followed that was in [1:12:46] vegetable production a year or two ago. [1:12:50] But um I you know I mean our my intent [1:12:53] and our our intent is always to design a [1:12:54] very water efficient project [1:12:57] um to the extent of you know how we're [1:13:00] using water the type of water we're [1:13:01] using whether it's you know portable or [1:13:03] non-potable water sources and I think to [1:13:05] the greatest extent possible our intent [1:13:07] is to use uh non-potable water sources [1:13:10] including canal water which is available [1:13:12] to the site today. [1:13:16] >> Thank you for that. I I have to the [1:13:18] » Thank you for that. I I have to the [1:13:18] point to the point that you made about [1:13:20] the project meets all the regulations [1:13:23] related to water efficiency and [1:13:27] >> I guess that's a question for staff. Um [1:13:31] » I guess that's a question for staff. Um [1:13:31] when we talk about water efficiency does [1:13:34] it does it incorporate all water use [1:13:36] including non-potable um and domestic or [1:13:40] is it only uh a domestic [1:13:43] >> Say that again. I'm sorry. [1:13:45] » Say that again. I'm sorry. [1:13:46] So our regulations for water efficiency [1:13:49] >> are they only for domestic or are they [1:13:50] » are they only for domestic or are they [1:13:50] all for all water use [1:13:52] >> for all water use and we look at indoors [1:13:55] » for all water use and we look at indoors [1:13:55] and out as well as outdoors. [1:13:58] >> So although this is using the acre acre [1:14:02] » So although this is using the acre acre [1:14:02] feet per acre it met all those [1:14:05] regulations otherwise it would have been [1:14:07] denied. [1:14:07] >> Correct. Correct. And to get back to [1:14:09] » Correct. Correct. And to get back to [1:14:09] your question about how does this golf [1:14:12] course proposed golf course compares to [1:14:14] the curtain golf courses and we tracked [1:14:16] down Olivia's um presentation to the [1:14:19] water count uh water counts academy um [1:14:22] and her average of uh 955 acre feet per [1:14:26] year um on a golf course on larger cores [1:14:29] it's about 1,400 acre feet per year. [1:14:33] So to compare to this project, the [1:14:36] demand here is 67 below the average. [1:14:40] >> Yeah, it's hard because I think this is [1:14:41] » Yeah, it's hard because I think this is [1:14:41] a shorter this is not a full 18, right? [1:14:45] >> Short course. [1:14:48] » Short course. [1:14:48] I just I just um you know this I've been [1:14:52] kind of opposed to kind of restrictions [1:14:54] on any of these things but times are [1:14:56] changing a little bit and um I just want [1:14:58] to make sure that we're not we're not [1:15:00] approving something that's going to come [1:15:02] back and [1:15:02] >> I don't think it is [1:15:05] » I don't think it is [1:15:05] I don't think it is. It's met all it's [1:15:06] met all our regulations. [1:15:08] >> Yeah. If I may just real briefly just to [1:15:10] » Yeah. If I may just real briefly just to [1:15:10] to remind the board this is a WSA to [1:15:13] determine whether there are uh [1:15:15] sufficient water supplies during normal [1:15:17] single dry and multi dry multiple dry [1:15:19] years over a 20-year projection to meet [1:15:22] the projected demands. This is not a [1:15:24] commitment to water service. This is [1:15:27] part of a squa uh process being done by [1:15:30] the land use agency and the applicant [1:15:32] much like a traffic report or air [1:15:34] quality or things of that nature. It's [1:15:36] not a commitment to service. It is not [1:15:39] it does not overrule the use [1:15:42] requirements that this board and this [1:15:44] district has now or implements prior to [1:15:47] this actually being developed. So it [1:15:50] doesn't limit or overrule [1:15:53] the use limitations that apply at CBWD, [1:15:56] nor is it even a commitment to serve [1:15:58] water. It's part of the secret process [1:16:00] at the applicants level. It's not [1:16:02] binding on this board, nor does it [1:16:05] change today or at any time what the [1:16:08] water used to restrictions and [1:16:09] conservation measures are in effect [1:16:11] today or may be in effect at the time [1:16:14] they develop the property. [1:16:16] >> I I I get what you're saying, Jeff, but [1:16:18] » I I I get what you're saying, Jeff, but [1:16:18] listen, [clears throat] that that is [1:16:19] that that wouldn't be a nice thing to [1:16:20] do. I mean, once we approve this, we're [1:16:22] basically telling the project, you're [1:16:24] good to go. I mean, for us to come back [1:16:26] and say, you know what, things have [1:16:28] changed. We're going to take that away. [1:16:30] I wouldn't want to do that. We're we're [1:16:32] so far away from our projected water [1:16:34] demand that this looks into like 20 20 [1:16:37] years ahead. We're at we're at 39%. [1:16:40] >> We I mean I think I' I'd be more in [1:16:42] » We I mean I think I' I'd be more in [1:16:42] agreement with trying to be more careful [1:16:44] if we were like at 90% and we were [1:16:48] reaching our kind of our our threshold, [1:16:51] but we're we're we're so far we're so [1:16:53] far away from from it. And I mean this [1:16:55] represents 1 point something% [1:16:57] of our projected demand. [1:16:59] I was just more worried about the look. [1:17:02] >> Jeff, when does when does u the right to [1:17:06] » Jeff, when does when does u the right to [1:17:06] serve become verifiable and a promise? I [1:17:09] mean, it's not during this process. It's [1:17:11] a process. Is it the verification [1:17:14] process that we have? [1:17:15] >> No, it's it's whatever the application [1:17:17] » No, it's it's whatever the application [1:17:17] process is to large developments to seek [1:17:20] service. I that [1:17:21] >> service application [1:17:22] » service application [1:17:22] >> be a water service application process [1:17:24] » be a water service application process [1:17:24] >> agreement. [1:17:25] » agreement. [1:17:25] >> Yeah. So when they come forward with [1:17:27] » Yeah. So when they come forward with [1:17:27] plans and say we're going to build this [1:17:28] and this is where we're going to put in [1:17:30] then the you know staff says well this [1:17:33] is how we need to have it built. This is [1:17:35] how much water you can use. This is [1:17:37] where the water goes. This is the water [1:17:39] source. [1:17:40] >> So that's when the uh the developers [1:17:42] » So that's when the uh the developers [1:17:42] plans meet the district's ordinance at [1:17:46] that point. [1:17:46] >> Correct. [1:17:47] » Correct. [1:17:47] >> Right. [1:17:47] » Right. [1:17:47] >> Which we're not even to the point of [1:17:49] » Which we're not even to the point of [1:17:49] them applying for service. [1:17:50] >> Right. Right. [1:17:53] » Right. Right. [1:17:53] And um Joanne, is our uh [1:17:58] under our ordinance, do we have an [1:18:00] overall acre feet per acre on that or is [1:18:03] it just depending on the type of [1:18:05] development? [1:18:07] >> It's the type of development [1:18:09] » It's the type of development [1:18:09] >> and of course like Jeff pointed out is [1:18:12] » and of course like Jeff pointed out is [1:18:12] that as our ordinance um get amended [1:18:16] then of course we would be more [1:18:18] conservative based on that ordinance. [1:18:22] Okay. Well, I mean, I I'll make a motion [1:18:25] to approve the water supply assessment [1:18:28] under the under the thoughts that, you [1:18:31] know, times are changing and um uh I u [1:18:35] and we are getting drier and this [1:18:37] nonpotable water use to me means a fair [1:18:41] amount of Colorado River water which is [1:18:43] at risk and um and recycled water which [1:18:47] is developing. So um and we are [1:18:51] underneath our overall u water supply uh [1:18:55] outlooks but um I would say you know I'm [1:18:59] making the motion uh with great concerns [1:19:01] about the overall acre feet per acre in [1:19:05] this project and that as we go forward [1:19:08] and and approve these or or deny them [1:19:12] that uh acre feet per acre is a a metric [1:19:15] that is pretty important when we look at [1:19:18] overall supply. So, I'll make the motion [1:19:20] to [1:19:20] >> I'll second. [1:19:21] » I'll second. [1:19:21] >> So, we got a motion, a second, and I and [1:19:23] » So, we got a motion, a second, and I and [1:19:23] I'll say if you could somebody from [1:19:25] staff could or share the that table, [1:19:27] Jim, so that we can gauge on how this [1:19:30] compares to other uh golf courses. [1:19:33] >> Hi, sir. [1:19:33] » Hi, sir. [1:19:34] >> That that'd be helpful. And uh [1:19:35] » That that'd be helpful. And uh [1:19:35] >> we'll do [1:19:36] » we'll do [1:19:36] >> uh so there's a a motion, a second u we [1:19:39] » uh so there's a a motion, a second u we [1:19:39] have roll call, please. Uh Director [1:19:41] Agar, you have any comments? [1:19:43] >> I I do not. Thank you. [1:19:45] » I I do not. Thank you. [1:19:45] >> Okay, we we can have a roll call. [1:19:47] » Okay, we we can have a roll call. [1:19:47] >> Okay. Vice President Estrada. [1:19:49] » Okay. Vice President Estrada. [1:19:50] >> Yes. [1:19:51] » Yes. [1:19:51] >> Director Aguular. [1:19:52] » Director Aguular. [1:19:52] >> Yes. [1:19:53] » Yes. [1:19:53] >> Director Biano. [1:19:54] » Director Biano. [1:19:54] >> Yes. [1:19:55] » Yes. [1:19:55] >> Director Nelson. [1:19:55] » Director Nelson. [1:19:56] >> Hi. [1:19:56] » Hi. [1:19:56] >> Motion pass. [1:19:57] » Motion pass. [1:19:57] >> Thank you. [1:19:59] » Thank you. [1:19:59] >> And um [1:20:00] » And um [1:20:00] >> I think we could get John. [1:20:04] » I think we could get John. [1:20:04] >> You want to grab John? [1:20:06] » You want to grab John? [1:20:06] >> Okay. [1:20:07] » Okay. [1:20:07] >> Standing there waiting. [1:20:16] » Made it. Should put a surf [1:20:22] less water. [1:20:23] >> I know. [clears throat] [1:20:28] Okay. [1:20:32] On to 9A. [1:20:35] We did have the Was it just the one that [1:20:38] came in [1:20:40] >> for this on C? [1:20:41] » for this on C? [1:20:41] >> I can't get my mic. Yes, that came in uh [1:20:43] » I can't get my mic. Yes, that came in uh [1:20:43] yesterday evening. So, I went ahead and [1:20:46] added that on. It was distributed to the [1:20:48] board and added to the blog. [1:20:50] >> All right. Thank you. [1:20:52] » All right. Thank you. [1:20:52] Board comments and request for future [1:20:54] agenda items. General board comments. [1:20:58] Director Nelson. [1:21:00] >> Um, no, not too much. Just um, you know, [1:21:03] » Um, no, not too much. Just um, you know, [1:21:03] California has been declared drought [1:21:05] free. How about that? Drought free. Um [1:21:08] uh and we're and I guess Orville is [1:21:11] releasing flood supplies uh with uh no [1:21:15] opportunity to collect those as exports [1:21:17] out of the Delta. So um I guess all is [1:21:21] good in the world. Um [1:21:24] um although Colorado River systems at uh [1:21:28] 80 no 66% of their snow pack and as you [1:21:32] recall we had 100% uh snowpack with [1:21:36] about a 75% runoff. So uh this is off to [1:21:40] our driest year on the Colorado River [1:21:44] basin in quite a number of years if not [1:21:47] in all history. So, um, should be [1:21:50] interesting, uh, how it affects the [1:21:52] negotiations going forward. Right now, [1:21:55] that's all I have. [1:21:58] >> Um, Director Aguilar, [1:22:02] » Um, Director Aguilar, [1:22:02] >> no, John, no comments. [1:22:03] » no, John, no comments. [1:22:03] >> Okay, thanks. Vice President Estrada, [1:22:08] no, no comments. [1:22:13] I think I'm going to pass also. [1:22:16] Do we have any requests for future [1:22:18] agenda items? [1:22:23] » Hearing none. [1:22:25] >> On to reports for meetings. We had um [1:22:28] » On to reports for meetings. We had um [1:22:28] let's see the December 23rd special [1:22:30] meeting. Those present were listed here. [1:22:33] Um January 8th conservation commission. [1:22:37] Director Biano. [1:22:39] So this meeting was basically all about [1:22:43] the burrowing owl. In October 2024, the [1:22:47] state uh has put a petition out to uh [1:22:51] designate the western buring owl as [1:22:53] threatened endangered. [1:22:56] And uh through our multiecies habitat [1:23:00] plan uh it was thought that uh in the [1:23:05] Coachella Valley uh we had zero [1:23:07] burrowing owls and we needed 15 uh [1:23:12] groups. [1:23:13] I'm not sure they kind of explained it [1:23:15] but I don't know if I could fully [1:23:17] explain it to you. It's it's a grouping [1:23:18] of al so 15 groupings. Um, IID [1:23:22] thankfully uh went out and uh spent $4 [1:23:26] million on a survey uh for the Imperial [1:23:30] Valley and the Coachella Valley. Uh and [1:23:34] uh luckily we have 500 [1:23:38] uh of these uh pairs here in the [1:23:42] Coachella Valley and the Imperial Valley [1:23:45] has over 7,800. [1:23:49] So there is some caution and the caution [1:23:52] is is that sometimes uh the data doesn't [1:23:55] drive decisions in Sacramento and that [1:23:59] the word was to get it out to our [1:24:02] elected to pass the word to uh everyone [1:24:06] else that this you know this should not [1:24:10] be a problem here in the Coachella [1:24:11] Valley and that the Coachella Valley [1:24:14] from here all the way to the Imperial [1:24:15] Valley should be carved out of uh this [1:24:19] uh threatened endangered species. So we [1:24:22] will see how things go. But I want to [1:24:25] say thank you to IID for for this. This [1:24:28] was this was a huge huge undertaking. [1:24:31] They had you know 80 to 100 people uh in [1:24:35] the Coachella Valley that uh it took to [1:24:38] actually go out and and walk uh these [1:24:40] areas. Uh most of the areas are not in [1:24:43] the agricultural areas. They're they're [1:24:46] more uh in the foothills below Desert [1:24:48] Hot Springs and Thousand Palms and then [1:24:52] in Palm Springs. So, it was not not an [1:24:54] easy task. There wasn't a lot of roads [1:24:57] like they have in Imperial Valley where [1:25:00] uh you could drive to and find these [1:25:02] owls. So, which probably a good thing [1:25:05] that there's not people next to them. [1:25:08] Anyways, that's my update. [1:25:11] >> Thank you. [1:25:13] » Thank you. [1:25:13] Yeah. Know I need to learn more about [1:25:14] that buring owl. I have a a lot of owls [1:25:19] around my house, but not those kinds. [1:25:22] >> Weren't we going to Didn't we ask for [1:25:24] » Weren't we going to Didn't we ask for [1:25:24] like an item to to come to us in close [1:25:26] session maybe? Um I think at the last [1:25:29] meeting there was a comment on that. Is [1:25:31] that being scheduled? [1:25:35] » Current currently there are a lot of [1:25:37] moving parts at the state level. our [1:25:39] representatives working with way crawl [1:25:41] food office to address this issue. So, [1:25:44] um we'll bring this back to the board in [1:25:47] February in close session. [1:25:49] >> Thank you. [1:25:49] » Thank you. [1:25:49] >> Thank you. Thank you. [1:25:50] » Thank you. Thank you. [1:25:50] >> Yeah, of course. [1:25:51] » Yeah, of course. [1:25:51] >> Okay. The the next meeting was January [1:25:53] » Okay. The the next meeting was January [1:25:53] 9th, Colorado River Board, Director [1:25:56] Nelson. And actually, I made an [1:25:57] appearance there as well. [1:26:00] >> Since they're were local, I couldn't [1:26:02] » Since they're were local, I couldn't [1:26:02] resist. [1:26:03] >> No, thanks for coming, John. Appreciate [1:26:05] » No, thanks for coming, John. Appreciate [1:26:05] that. Um [1:26:07] obviously we got our updates on on dry [1:26:10] hydrarology in the basin and then as uh [1:26:13] we were meeting the Bureau of [1:26:15] Reclamation uh released uh the draft [1:26:19] environmental impact station uh [1:26:21] statement um EIS for the post2026 [1:26:25] operational guidelines strategies for [1:26:28] Lake Pal and Lake me. Uh in this [1:26:30] document there are five alternatives. Uh [1:26:33] and we discussed those alternatives at [1:26:35] some length but not in um the degree uh [1:26:39] that we could because obviously this was [1:26:42] released during our meeting our CRB [1:26:44] meeting. Um [1:26:46] but uh there are five different [1:26:49] alternatives. Some go by the priority [1:26:51] system and uh there are other [1:26:53] alternatives in here that go to 4 [1:26:57] million acre feet of reductions in the [1:27:00] lower basin. Um as you know the number [1:27:03] out there is 1.5 million acre feet of [1:27:06] the entire lower basin offer with Mexico [1:27:10] included. So 4 million is you know over [1:27:14] double. So, uh there are some problems [1:27:17] uh with that obviously and uh uh this [1:27:20] week uh we learned at the meeting that [1:27:22] this week uh uh the bureau has [1:27:25] sequestered the principles in um in Utah [1:27:31] uh the frigid air of Utah to uh try and [1:27:34] hammer out some greater details on what [1:27:37] a consensus u solution might be. Steve [1:27:40] Abbott is um attending that for on our [1:27:43] behalf. Uh [1:27:46] and so we'll see what they come up with. [1:27:49] Uh the one of the alternatives is a [1:27:52] hybrid of the upper basin, lower basin [1:27:55] potential consensus. Uh and there are [1:27:58] some uh problems with it. Uh but it does [1:28:01] offer some uh storage opportunities as [1:28:04] well as dealing with uh current ICS that [1:28:07] would be beneficial to Metropolitan. Um [1:28:12] it seems to me like that that [1:28:14] alternative if uh negotiated between the [1:28:17] upper and lower basin would be uh [1:28:20] reasonable if we could get some [1:28:22] accommodations in that and some [1:28:24] commitment from the upper basin to [1:28:26] contribute. it it looks at um [1:28:30] curtailments of between 1.5 which is on [1:28:33] the table of the lower basin and 2.1 [1:28:35] million acre feet. Um so another 600,000 [1:28:40] and uh I think the lower basin's [1:28:42] negotiation strategy has been we'll [1:28:45] contribute 1.5 and then split something [1:28:49] addition to that to the upper basin. So [1:28:50] it seems to me like there are now some [1:28:52] parameters out there that can be [1:28:54] discussed and u hopefully agreed upon [1:28:57] with that group. [1:28:59] >> Can I ask you a question? So [1:29:01] » Can I ask you a question? So [1:29:01] >> is reclamation just putting they're just [1:29:04] » is reclamation just putting they're just [1:29:04] worried about lower and upper but they [1:29:06] they don't have any recommendations on [1:29:09] how the lower basin would accomplish [1:29:11] that. [1:29:12] >> No, it's just the the the big number, [1:29:14] » No, it's just the the the big number, [1:29:14] right? So, so, uh, [1:29:16] >> so there's still, so there's, [1:29:17] » so there's still, so there's, [1:29:17] >> so there's still there's still lower [1:29:19] » so there's still there's still lower [1:29:19] bas. [1:29:20] >> So, there's a there's that negotiation [1:29:21] » So, there's a there's that negotiation [1:29:22] and then there's another negotiation [1:29:23] that will come later. [1:29:24] >> Exactly. [1:29:25] » Exactly. [1:29:25] >> Okay. [1:29:25] » Okay. [1:29:25] >> Exactly. [1:29:29] » Thank you. Um, other reports, actually, [1:29:32] I have [clears throat] two. [1:29:34] Uh, January 7th, we had the Coachella [1:29:38] Irrigated Lands Coalition meeting. [1:29:41] >> Were you on that one? [1:29:42] » Were you on that one? [1:29:42] >> I was on that. Peter, Director Nelson [1:29:44] » I was on that. Peter, Director Nelson [1:29:44] also [1:29:46] um [1:29:48] are really looking for some help from [1:29:51] Rachel Johnson with the Farm Bureau and [1:29:53] she's getting up to speed [1:29:55] >> and I think she's going to be a [1:29:56] » and I think she's going to be a [1:29:56] tremendous help for us um to try to get [1:30:01] things done at a more reasonable cost [1:30:04] um otherwise there's consultants out [1:30:06] there that'll do it for a lot more money [1:30:08] and uh it's turning into a a bit of a [1:30:11] burden. [1:30:12] for the uh irrigators. [1:30:16] Don't know if you had anything else, but [1:30:18] [clears throat] [1:30:19] >> that's how I view it. That's how I view [1:30:20] » that's how I view it. That's how I view [1:30:20] it. All right. And then actually [1:30:22] yesterday I had a Desert Valley Builders [1:30:24] Association [1:30:26] meeting with our new executive director. [1:30:28] There was a board meeting and um [1:30:34] there was talk I think it was true from [1:30:37] our representative down in Imperial [1:30:39] Valley that there's a plan for a 10 [1:30:42] billion dollar investment in a data [1:30:44] center. I'd like to learn more about [1:30:47] that. 10 billion in Imperial [1:30:50] >> in Imperial. [1:30:51] » in Imperial. [1:30:51] >> Yes. [1:30:52] » Yes. [1:30:52] >> There's a lot of protest. [1:30:53] » There's a lot of protest. [1:30:53] >> I know there's a lot going on down [1:30:54] » I know there's a lot going on down [1:30:54] there. I know. I [1:30:56] do. Do we get news clips from the [1:30:58] Imperial Valley Press? [1:31:00] >> We do. [1:31:00] » We do. [1:31:00] >> We do. Huh? I don't know if I [1:31:02] » We do. Huh? I don't know if I [1:31:02] >> have time to read all those, but those [1:31:04] » have time to read all those, but those [1:31:04] are the ones I'd like to start reading. [1:31:06] >> I think the developer just sued some of [1:31:08] » I think the developer just sued some of [1:31:08] the cities. [1:31:11] [clears throat and cough] [1:31:12] >> Anyways, that's [1:31:15] » Anyways, that's [1:31:15] apparently they have the power. [1:31:17] Put it right on one of the transmission [1:31:19] lines. [1:31:21] That's all I had. Any other meetings? [1:31:24] I uh yeah, on January 9th um we uh [1:31:29] hosted um [1:31:31] uh the water education for Latino [1:31:33] leaders group that makes its way down [1:31:35] here probably for the last [1:31:38] 10 plus years now. Um [1:31:41] they spend uh Friday, Saturday and [1:31:43] Sunday here speaking with um various [1:31:46] folks. Uh I talked to them on Friday. [1:31:50] Um Patrick from the SNC Authority talked [1:31:52] to them Saturday and Monica Deas who [1:31:54] used to be with Riverside County and [1:31:56] then USDA and I think now she kind of [1:31:58] runs her own um [1:32:01] firm uh spoke to them also on Saturday [1:32:05] and Director Nelson, you spoke to them [1:32:06] on Sunday. [1:32:07] >> Sunday. [1:32:08] » Sunday. [1:32:08] >> Uh so uh I'll I'm I'm reporting on the [1:32:12] » Uh so uh I'll I'm I'm reporting on the [1:32:12] 9th and the 10th. I was with them on [1:32:15] Friday. [1:32:17] um talked about a lot of the things that [1:32:18] we're doing with um the disadvantaged [1:32:20] communities and the expansion of water [1:32:22] and sewer infrastructure into the east [1:32:24] valley and uh a little bit about the [1:32:27] salt and sea and then I uh went with [1:32:30] them uh to the salt and sea in the [1:32:31] morning uh and spend uh the morning and [1:32:34] the afternoon with them. [1:32:37] uh smaller group this year maybe they [1:32:40] have a total of 13 but only six of them [1:32:43] I think came down to the region [1:32:46] >> and then they um they also have another [1:32:48] » and then they um they also have another [1:32:48] visit they make to San Diego and then I [1:32:51] think one to like is it how you [1:32:53] pronounce it to [1:32:56] >> Hatchip yeah so they go they go there [1:32:58] » Hatchip yeah so they go they go there [1:32:58] too I I've never been to the other [1:33:01] locations but I'm I'm thinking I might [1:33:03] go to the San Diego visit it sounds like [1:33:06] they actually get to see some of the [1:33:09] Tijuana River. Um I've never seen that [1:33:12] in person. I hear it's a quite a sight [1:33:15] to look at that. So, um I think that's [1:33:17] happening next month, but uh yeah, [1:33:21] that's two days I spent with them, a [1:33:23] great group. Uh we do have someone's [1:33:26] kind of semi-local uh that joined the [1:33:29] group this this time and that's Martha [1:33:31] uh Sai. How do you pronounce your last [1:33:35] name? [1:33:35] >> Sing. S [1:33:36] » Sing. S [1:33:36] >> same [1:33:37] » same [1:33:37] >> yes supervisor of Imperial County. So [1:33:39] » yes supervisor of Imperial County. So [1:33:39] she she was she was with us this this [1:33:41] weekend. [1:33:42] >> Um was [clears throat] able to speak to [1:33:44] » Um was [clears throat] able to speak to [1:33:44] her. So [1:33:46] uh yeah that's that's it for me. [1:33:49] >> Great. Any any [1:33:50] » Great. Any any [1:33:50] >> Yeah, I was I was there on the 11th with [1:33:52] » Yeah, I was I was there on the 11th with [1:33:52] well and um uh they have a great format. [1:33:56] Um they they get all your bio and u all [1:33:59] your introductory amount uh information [1:34:02] and they don't want to see a PowerPoint. [1:34:04] they just want to have interviews. So [1:34:06] they they're tasked with, you know, [1:34:09] developing questions and they had some [1:34:11] very good questions about Colorado [1:34:13] River. And so I I they wanted to hear [1:34:16] about that process and uh how the [1:34:19] governance works within the state on [1:34:21] Colorado River issues and how the [1:34:23] contractors like CBWD fit in. So, it was [1:34:26] a it was a good interview and um I think [1:34:29] that able to um get the uh information [1:34:34] across to them u about Colorado River in [1:34:37] a in a good manner there. So, good good [1:34:40] program [1:34:41] >> and uh just want to say thank you to BBK [1:34:43] » and uh just want to say thank you to BBK [1:34:43] also for always helping us with the some [1:34:46] of the arrangements there. It's always [1:34:48] uh good to to count on you. [1:34:54] » Any others? Director Aguilar. [1:34:56] >> No, John. I'm good. [1:34:58] » No, John. I'm good. [1:34:58] >> All right, we're good. Do is there a [1:35:00] » All right, we're good. Do is there a [1:35:00] motion to approve PDM for the meetings [1:35:03] reported on? [1:35:05] >> I'll make a motion. I'll second. [1:35:07] » I'll make a motion. I'll second. [1:35:07] >> Roll call vote. [1:35:10] » Roll call vote. [1:35:10] >> President Pal, [1:35:11] » President Pal, [1:35:11] >> I. [1:35:11] » I. [1:35:11] >> Vice President Estrada, [1:35:13] » Vice President Estrada, [1:35:13] >> yes. [1:35:13] » yes. [1:35:13] >> Director Biano, [1:35:14] » Director Biano, [1:35:14] >> I. [1:35:14] » I. [1:35:14] >> Director Aguilar, [1:35:16] » Director Aguilar, [1:35:16] >> yes. [1:35:16] » yes. [1:35:16] >> And director Nelson, [1:35:17] » And director Nelson, [1:35:18] >> I pass 50. [1:35:19] » I pass 50. [1:35:19] >> General manager report. Yes, there are [1:35:21] » General manager report. Yes, there are [1:35:21] just a couple things um on the ID8 uh [1:35:24] Mission Springs Water District has asked [1:35:26] that we go out and do some outreach with [1:35:28] the uh community council meetings. So, [1:35:30] we've coordinated with the supervisor's [1:35:32] office and I'll be doing two of those [1:35:34] today. Desert Edge and Sky Valley and [1:35:36] then India Hills will be tentatively on [1:35:40] the 27th. Um so, I think uh that we [1:35:45] just go out and say a couple of things [1:35:46] and answer some questions and see where [1:35:48] that goes. That's all I've got. Thank [1:35:50] you. Council report. [1:35:52] >> Yes. Uh SB827 went into effect the first [1:35:56] » Yes. Uh SB827 went into effect the first [1:35:56] of the year. It has two components. The [1:35:58] first component is as you know all board [1:36:00] members are required to do AB 1234 [1:36:02] training uh within one year of taking [1:36:05] office and then every two years [1:36:07] thereafter. [1:36:08] This bill changed that so that new [1:36:10] members of the board have to meet that [1:36:12] requirement in the first six months. But [1:36:15] the other uh main part of AB 1234 is [1:36:17] that it now applies to department heads [1:36:20] and administrative officers of the of [1:36:22] the district, not just the the elected [1:36:24] board of directors. [1:36:26] Uh the other part of SP827 deals with a [1:36:29] new requirement for some additional [1:36:31] training on financial training [1:36:33] requirements and that will be the [1:36:34] subject of your finance committee [1:36:36] meeting and a future board meeting. Uh [1:36:38] so more to come on that. Thank you. [1:36:40] >> Thank you. [1:36:42] » Thank you. [1:36:42] Any department reports? [1:36:43] >> Yes, sir. We have one uh two. Okay, we [1:36:46] » Yes, sir. We have one uh two. Okay, we [1:36:46] have two. [1:36:47] >> Wow. [1:36:47] » Wow. [1:36:48] >> Well, Joanne has asked first to [1:36:49] » Well, Joanne has asked first to [1:36:49] introduce a new employee. [1:36:51] >> Oh, great. [1:36:54] » Oh, great. [1:36:54] >> Yes, we're very excited to have Kristen [1:36:56] » Yes, we're very excited to have Kristen [1:36:56] Thomas. She's our new environmental [1:36:58] services administrator, water quality [1:37:01] and compliance, who should lead our [1:37:02] water quality um monitoring and the [1:37:06] laboratory team. [1:37:08] >> Welcome. Great. Welcome. [1:37:09] » Welcome. Great. Welcome. [1:37:09] >> Welcome. [1:37:12] » Welcome. [1:37:12] >> Yeah. Thank you. have no words. Dan [1:37:15] » Yeah. Thank you. have no words. Dan [1:37:15] >> and then Dan, [1:37:17] » and then Dan, [1:37:17] >> apologize to Jim. I didn't announce that [1:37:19] » apologize to Jim. I didn't announce that [1:37:19] I was going to speak, but um [1:37:21] >> it's okay. I saw your hand. [1:37:23] » it's okay. I saw your hand. [1:37:23] >> Uh so we have a little situation on the [1:37:25] » Uh so we have a little situation on the [1:37:25] canal we're dealing with. I just wanted [1:37:26] to let you guys know. Um as you know, we [1:37:30] built a mid canal to get rid of half the [1:37:32] clay area whereby we have cracking. We [1:37:35] have another five, six miles of [1:37:37] cracking, four upstream, one downstream. [1:37:40] So I'm on the CCLP with San Diego. Uh we [1:37:43] agreed to do an inspection. We did the [1:37:45] inspection on Thursday after the rains. [1:37:47] As we drew the water down, there was a [1:37:49] there was a lot of water in the clay [1:37:52] behind some of the canal. So it did a [1:37:54] rotational slip like two or three [1:37:56] hundred feet on one side and couple [1:37:58] sections a couple hundred feet in the [1:37:59] other side. So we've been working uh to [1:38:02] get the water down two feet deep. We've [1:38:04] been pouring uh shot over rip wrap for [1:38:06] the 14 hours a day, Friday, Saturday, [1:38:08] and yesterday. So, we're just struggling [1:38:11] to um we're still pouring concrete at [1:38:14] 6:00 p.m. and we put water on it at uh [1:38:17] at about 9:30. So, we're struggling to [1:38:20] get our orders for the next few days. [1:38:21] So, I just want to give you a heads up. [1:38:23] We're trying to ask the users to prorate [1:38:26] wherever possible or if it dates just [1:38:28] postpone a couple days to get our [1:38:30] delivery down, float off the lake [1:38:32] wherever possible downstream, stack the [1:38:34] canal. But, it's going to be a struggle. [1:38:36] Uh we hope to have this done by Friday, [1:38:38] but the next couple days might be a [1:38:39] little light on orders. So don't yell. [1:38:42] It's all good. We got it under control. [1:38:44] And in the end, um the inspection is [1:38:46] going to be great because um once we [1:38:49] have the GPS locations of where the [1:38:51] cracking is actually taking place, uh [1:38:54] we'll do a contract document. San Diego [1:38:56] and the San Louis Ray will pay for it. [1:38:58] it'll likely uh be out to bid and in [1:39:02] like October of 26 uh hopefully awarding [1:39:06] u by December. Just wanted to give you a [1:39:09] heads up that we're going to be a little [1:39:10] light the next few days that summer. [1:39:14] >> We planned the inspection so that it was [1:39:16] » We planned the inspection so that it was [1:39:16] in this this time frame to be cool, but [1:39:18] we did not anticipate to have this [1:39:20] situation. [1:39:22] >> Thanks, Dan. [1:39:23] » Thanks, Dan. [1:39:23] >> Thanks. [1:39:23] » Thanks. [1:39:24] >> Thanks. [1:39:25] » Thanks. [1:39:25] Any any L? Yeah, we got two. Might as [1:39:28] well do three. [laughter] [1:39:29] >> No, [1:39:30] » No, [1:39:30] >> we should have all of the department [1:39:31] » we should have all of the department [1:39:31] head. No, that's okay. [1:39:33] >> Well, thank you then. So, we do not have [1:39:35] » Well, thank you then. So, we do not have [1:39:35] a close session for today's meeting. And [1:39:38] so, with no further business, we are [1:39:40] adjourned.