[22:10]
Good evening. We do have a member of the
[22:12]
Minister Alliance with us this evening.
[22:13]
You are correct.
[22:15]
>> Ray,
[22:15]
>> you're Ray Gurnie.
[22:16]
>> Yeah, Ray Gurnie. You're here to pray
[22:18]
for us, right?
[22:19]
>> I am.
[22:20]
>> Okay. Ray, would you please come forward
[22:21]
to the microphone? Thank you.
[22:27]
Heavenly Father, as we come before your
[22:28]
holy throne of grace tonight, we ask for
[22:31]
your watch care over the city of Oak
[22:34]
Grove. I bet there's a lot of decisions
[22:36]
need to be made tonight. I pray they'll
[22:37]
come out the best. And also want to
[22:40]
mention our day of voting tomorrow. I
[22:43]
pray that people will get out and vote
[22:46]
their heart. And I I pray it'll be for
[22:49]
the good of of everywhere we go in this
[22:53]
country. We ask for your protection over
[22:56]
us and all those who uh serve us in so
[22:58]
many ways.
[23:01]
Be with everyone here tonight. We thank
[23:02]
you for them coming and and dedicate
[23:05]
their time to whatever it is they're
[23:06]
going to do tonight. In Jesus name I
[23:08]
pray. Amen.
[23:10]
>> Amen. Amen.
[23:11]
>> Please join me for the pledge of
[23:12]
allegiance. I pledge allegiance to the
[23:15]
flag of the United States of America and
[23:18]
to the republic for which it stands. One
[23:21]
nation under God,
[23:23]
>> indivisible, with liberty and justice for
[23:26]
all.
[23:35]
» I call the August 3rd, 2026 board of
[23:38]
aldermen meeting to order. City clerk,
[23:40]
would you please call the role?
[23:44]
>> Tracy Newcomer,
[23:45]
>> here.
[23:46]
>> Kelly Neto.
[23:48]
>> Rachel Kilmer,
[23:49]
>> here. Shane Shawaker,
[23:52]
>> Pam Pope
[23:52]
>> here,
[23:53]
>> Bart Easter
[23:54]
>> here,
[23:54]
>> and Mayor Dana Webb
[23:56]
>> here. Thank you. The next item on the
[23:58]
agenda is new business deletions or
[24:00]
continuences.
[24:02]
And the first item we have is public
[24:04]
comments. City clerk, do we have any
[24:07]
public comments?
[24:08]
>> There are none.
[24:08]
>> Thank you. The next item on the agenda
[24:11]
is a consent agenda. These items are
[24:13]
considered on the consent agenda so that
[24:16]
members of the board of aldermen by
[24:17]
unanimous consent can designate routine
[24:20]
items to be approved by one motion.
[24:23]
Tonight we have approval of the July
[24:25]
20th, 2026 board of alderman meeting
[24:28]
minutes and expenditures through July
[24:31]
29th, 2026.
[24:34]
>> I make a motion we approve the consent
[24:36]
agenda.
[24:37]
>> I'll second.
[24:38]
>> We have a motion and a second to approve
[24:40]
the consent agenda. Any discussion?
[24:45]
If not, all in favor say I.
[24:47]
>> I.
[24:48]
>> Opposed. Motion passes.
[24:51]
The next item on the agenda is
[24:53]
unfinished business. Tonight, we do not
[24:55]
have any unfinished business. So, we
[24:57]
will move on to the next item, which is
[24:59]
new business. Under new business, the
[25:02]
first item is discussion, consideration,
[25:04]
and possible action of bill number 26-16
[25:08]
regarding an ordinance amending the
[25:10]
annual budget. Matt,
[25:12]
>> yes, [snorts] thank you, mayor. This
[25:14]
budge amendment is requested to increase
[25:16]
the pump and motor maintenance budget
[25:17]
within the wastewater fund. Uh this year
[25:19]
the utility has experienced higher than
[25:21]
typical number of pump rebuilds and
[25:24]
replacements due to several contributing
[25:26]
factors that included a wet spring uh
[25:29]
which caused the system to increase in
[25:31]
flow requiring pumps to operate more
[25:32]
frequently and for longer durations than
[25:35]
may be normal. Additionally, several
[25:37]
pumps um had reached the end of their
[25:39]
expected service life requiring repair
[25:41]
and replacement. This included several
[25:43]
older pumps at the main lift station
[25:45]
which were originally installed in 2012.
[25:48]
They experienced failures this year
[25:49]
requiring immediate repairs and
[25:50]
replacements to maintain a reliable
[25:53]
wastewater surface to the main plant.
[25:55]
Those pumps that were repaired u move
[25:58]
the waste from the main lift to the
[26:00]
plant. The next agenda item tonight is
[26:02]
items addressed to replace two high flow
[26:05]
or peak capacity pumps at the main lift
[26:06]
station that uh pushes flow from the
[26:08]
main lift to the equalization basin for
[26:11]
high flow events. Those pumps were
[26:13]
originally installed in 2017
[26:16]
and reached the point where they had
[26:17]
failed either needing rebuild or
[26:18]
replacement. And at this point, um it's
[26:21]
a better value to purchase new than it
[26:23]
is to rebuild those motors. In total,
[26:27]
this budget line item um pump and motor
[26:30]
maintenance supports the wastewater
[26:32]
system, which includes eight total lift
[26:34]
stations and 21 various pumps of
[26:37]
different makes and models. Uh, so with
[26:39]
that, I'd be happy to answer any
[26:40]
questions the board may have. Uh, the
[26:42]
requested budget amendment is to
[26:43]
increase the budget from 45,000 to
[26:46]
135,000. Thank you.
[26:48]
>> Thank you, Matt. Does the board have any
[26:50]
questions for Matt?
[26:54]
» How does this affect our overall budget?
[26:56]
I mean, we've got the money or how tight
[26:59]
are we?
[27:00]
>> Yeah, we we'll be fine. We have healthy
[27:02]
fund balances. Last year, we added to
[27:04]
fund balance in the wastewater fund. Um,
[27:06]
so as these pumps go, um, you know, some
[27:08]
years are better than others. Just
[27:10]
depends on when they were put in
[27:12]
service, when the lift station was added
[27:13]
with growth. Um, you know, over the last
[27:16]
few years, we've averaged about 40,000
[27:18]
in repairs. Uh, back in 2022, we we had
[27:21]
95,000 in repairs. So, this does kind of
[27:24]
eb and flow with time,
[27:25]
>> but we will be fine with our budget um
[27:28]
in reserves.
[27:32]
» So, they're two separate
[27:35]
uh ordinances or or discussions and it's
[27:38]
hard to answer one without having
[27:40]
questions on the second. Is that fair?
[27:42]
>> That's fair. Yeah, sure.
[27:44]
>> So, can I ask questions on the on the second? Um
[27:49]
>> you mean can you ask questions now
[27:50]
regarding to the second agenda item
[27:53]
>> because we're you're asking us to
[27:54]
approve the the fund transfer?
[27:56]
>> I'm asking you to we're the ordinance is
[27:59]
asking you to amend the budget. Yes.
[28:02]
But
[28:05]
>> you can ask questions regarding the the pump the pumps.
[28:09]
>> Okay. Yes,
[28:10]
>> that's that's point is because Okay, so
[28:15]
there's a pretty big difference in the bids. Um and
[28:21]
you chose the lowest obviously or or we
[28:25]
need to go with the lowest bid. Um, and
[28:29]
I was just curious because I didn't see
[28:30]
in here. I see that that the the one the
[28:33]
horsepower, the RPMs, everything that
[28:35]
we're going with or or if we vote to go
[28:38]
with it. Um, but I didn't see what the
[28:40]
other pumps were as far as their
[28:43]
capacity. Were there any difference in
[28:45]
that?
[28:47]
>> Uh, no. Two of the quotes, the low bid
[28:50]
was 33,000, the mid bid was 45,000. Uh,
[28:53]
both of those included uh pump
[28:55]
specifications. So the low bid is is
[28:58]
going to is a sulcer pump. The mid bid
[29:00]
was a homoma pump. And those pumps uh
[29:02]
meet the requirements uh that we put out
[29:04]
with our bid. So
[29:05]
>> and they're both 20 horsepower.
[29:07]
>> They Yeah. So they'll they'll they meet
[29:09]
the the
[29:11]
>> Okay.
[29:11]
>> Total gallons, the the head head flow,
[29:14]
everything else. Uh I will say that
[29:16]
fluid and FTC have bid uh on our stuff
[29:19]
before. We've purchased pumps from both
[29:20]
those companies before. Uh Rand
[29:22]
Construction, which was the high bid of
[29:24]
111,000 was new. Uh, and they also did
[29:27]
not include specifications of their
[29:29]
pumps.
[29:29]
>> Okay. So, we don't even know what they
[29:31]
were thinking. Okay. All right. Thank
[29:32]
you. That I I was having a hard time
[29:34]
voting on one without
[29:36]
>> asking about the other.
[29:38]
>> Thank you.
[29:38]
Any other questions for Matt?
[29:45]
» This is an ordinance.
[29:47]
>> I move for first and second reading by
[29:48]
title only of bill number 26-16.
[29:53]
» Second. We have a motion and a second
[29:55]
for the first and second reading of the
[29:57]
proposed ordinance by title only. Any
[30:00]
discussion?
[30:02]
If not, all in favor say I.
[30:05]
>> I.
[30:05]
>> Opposed.
[30:07]
City clerk, would you please read the
[30:08]
full title of the bill two times?
[30:11]
>> An ordinance amending the annual budget
[30:13]
for the fiscal year beginning on January
[30:15]
1, 2026 and ending on December 31, 2026.
[30:21]
an ordinance amending the annual budget
[30:23]
for the fiscal year beginning January 1,
[30:25]
2026 and ending on December 31, 2026.
[30:31]
>> I move for adoption of bill number
[30:33]
26-16.
[30:36]
>> Second.
[30:37]
>> We have a motion and a second for the
[30:39]
adoption of bill number 26-16
[30:42]
to ordinance.
[30:43]
Any discussion?
[30:47]
If not, city clerk, would you please
[30:48]
call the role? Tracy Newcomer,
[30:50]
>> yes.
[30:51]
>> Rachel Kilmer,
[30:52]
>> yes.
[30:53]
>> Pam Pope,
[30:54]
>> yes.
[30:54]
>> And Bart Easter,
[30:55]
>> yes.
[30:56]
>> The motion is approved and ordinance
[30:58]
number 2169
[31:00]
is adopted.
[31:04]
» The next item on the agenda is
[31:06]
discussion, consideration, and possible
[31:07]
action regarding and installing two peak
[31:10]
flow pumps for the main lift station.
[31:13]
Matt?
[31:14]
>> Yes. Thank you, mayor. Um these bids
[31:16]
were advertised on July 13th for the
[31:18]
replacement of two peak flow pumps at
[31:20]
the main lift station. Bids were opened
[31:22]
on July 28th. We did receive three bids
[31:25]
u which are shown on the attached bid
[31:27]
tab. Um we had fluid equipment ran
[31:30]
construction and FTC equipment. Those
[31:32]
bids ranged from 33,275
[31:35]
to 111
[31:37]
uh777.
[31:39]
The two lower bids were much closer in
[31:42]
um numbers. 33,000 and 45,000. Rand
[31:45]
construction was the high bid at 111.
[31:48]
The low bid was submitted by FTC. Their
[31:50]
proposal includes two new sulcer peak
[31:53]
flow pumps and installation. We already
[31:56]
have one sulcer peak pump uh in
[31:58]
operation at the main lift station. So
[31:59]
using the same manufacturer and pump uh
[32:02]
will make maintenance easier as well as
[32:04]
for interoperability.
[32:06]
These pumps come with a three-year
[32:08]
warranty that covers uh both parts and
[32:10]
labor followed by additional two years.
[32:12]
Uh the fourth year would be 75% parts
[32:15]
and labor and the fifth year is 50%
[32:16]
parts and labor. The current lead time
[32:18]
is about 10 weeks once we um once the
[32:20]
pumps are delivered. Installation would
[32:22]
then be scheduled. Staff does recommend
[32:25]
approving the bid from FTC in the amount
[32:26]
of 33,275.
[32:30]
With that, be happy to answer any
[32:31]
questions the board may have.
[32:33]
>> Thank you, Matt. Does the board have any
[32:35]
questions about the peak flow pumps?
[32:38]
>> What's the anticipated lifespan of a
[32:39]
pump?
[32:41]
>> Yeah.
[32:41]
>> Is it hard to say just depending on the
[32:43]
usage?
[32:44]
>> It it it really is. Um
[32:46]
we have some that are pushing 15 years.
[32:49]
>> Um others are are newer than that. It
[32:53]
you know it really depends on it's such
[32:55]
a costic environment that they operate
[32:56]
in and you may be surprised the types of
[32:59]
things that can make it through the
[33:01]
system. Um, so you know, it might be
[33:03]
operating fine. All a sudden a beach
[33:04]
towel hits an impeller and wraps around
[33:07]
and breaks it. Um,
[33:09]
>> 8 years to 15 years is probably a
[33:12]
reasonable range
[33:14]
>> on the pumps.
[33:19]
» Any other questions for Matt?
[33:26]
I make a motion to approve the purchase
[33:29]
and installation of two peak flow pumps
[33:31]
for the main lift station from FTC
[33:33]
Equipment in the amount of $33,275.
[33:37]
» I'll second.
[33:38]
>> We have a motion and a second to
[33:41]
purchase two peak flow pumps for the
[33:44]
main lift station. Any discussion?
[33:48]
If not, all in favor say I. I.
[33:51]
>> I. opposed.
[33:53]
Motion passes. The next item on the
[33:56]
agenda is discussion, consideration, and
[33:58]
possible action regarding a resolution
[34:00]
for the board of the city of Oak Grove
[34:03]
establishing a one-year administrative
[34:05]
delay for data centers. Matt,
[34:09]
>> yes, thank you, mayor. So, at a previous
[34:11]
board meeting, uh the board requested
[34:12]
that staff bring back uh the topic of
[34:14]
data centers for further discussion
[34:16]
regarding potential updates to the
[34:17]
unified development code to the UDC. Uh
[34:20]
and while the city has not received any
[34:21]
development inquiries regarding u AI or
[34:25]
data centers um staff is recommending
[34:27]
that we do a proactive approach to
[34:28]
address this emerging land use um and
[34:31]
allow adequate time to evaluate and
[34:33]
amend the UDC as may be necessary. So
[34:36]
under our code the the board may
[34:37]
establish an administrative delay on
[34:39]
certain applications for a period of up
[34:41]
to one year. Uh the proposed resolution
[34:43]
would establish one-year administrative
[34:45]
delay on uh data center data center
[34:48]
development including um you know the things associated with
[34:53]
data centers including um utilities um
[34:56]
site plans
[34:58]
environmental reviews, generators, those
[35:00]
types of things.
[35:02]
So that would allow the time for staff
[35:04]
to um develop proposed amendments to the
[35:07]
UDC and then bring it through the
[35:09]
process which would be public hearings,
[35:10]
planning commission and then back to
[35:12]
this board. Um our current UDC does not
[35:14]
address data centers. So the resolution
[35:17]
would allow us to put that delay in
[35:19]
effect for 12 12 months which would be
[35:22]
August 3rd of 2027. So with that I'd be
[35:25]
happy to answer any questions the board
[35:26]
may have.
[35:27]
>> Thank you Matt. I do [snorts] think this
[35:29]
is a good plan. it gives time to put
[35:32]
something in place with lots of
[35:33]
discussion. Um will will you be bringing
[35:36]
something back slowly or you have a
[35:38]
presentation at some point?
[35:41]
>> Yeah, so probably the initial would be a
[35:44]
presentation back to this board. Um and
[35:46]
then for you guys then to make
[35:47]
recommendations and have staff then make
[35:49]
a report on those recommendations. You
[35:51]
would like to see further evaluation
[35:53]
discussion to the planning commission
[35:55]
that would then start a public hearing
[35:57]
process. Then the planning commission
[35:58]
would discuss those, make
[36:00]
recommendations back to this board, and
[36:01]
then you guys would have another public
[36:02]
hearing where you would make the final
[36:04]
determination on what those amendments
[36:06]
might be.
[36:07]
>> Thank you.
[36:08]
>> Does the board have any questions?
[36:10]
>> Thank you for bringing this. I didn't
[36:11]
even know this was an option. So, it
[36:12]
makes me feel a lot better that we can
[36:13]
really give our time and due diligence
[36:14]
because it's completely new frontier
[36:16]
obviously. Yes. So is it the one year
[36:19]
means no one can even file an
[36:20]
application for one year or if they file
[36:23]
an application that year term they are
[36:24]
not to receive an answer until the one
[36:26]
year is up. Kind of splitting hairs
[36:28]
there but just curious.
[36:33]
» Oops. The way it works is the um not
[36:36]
sure what's going on with that.
[36:38]
[laughter]
[36:38]
The way it works is it delays it it
[36:41]
directs staff to delay the acceptance or
[36:44]
process processes of an application
[36:47]
involving a data center. And the the
[36:50]
concept and I went back and looked
[36:51]
because it's been a while since we did
[36:53]
this here, but we have done an
[36:56]
administrative delay resolution seven
[36:58]
times since I've been here. Okay. The
[37:00]
last one was in 2013 had to do with
[37:04]
solar panels while we were looking at
[37:06]
regulations for solar panels. But
[37:09]
>> um what the the concept is that
[37:11]
[clears throat] we're going to adopt
[37:12]
regulations
[37:14]
and we want people that are going to be
[37:17]
able to that want to do this type of use
[37:19]
to do it in accordance with our
[37:21]
regulations. So you don't want people
[37:23]
running in the door trying to get ahead
[37:25]
of our regulations. Now, arguably with a
[37:28]
data center, um, we don't believe that
[37:30]
that's an allowed use currently under
[37:32]
the code anyway, but someone could
[37:35]
attempt to argue otherwise. You know,
[37:37]
how creative some people can get.
[37:39]
>> Yes.
[37:39]
>> So, I think um Matt's approach is is the
[37:42]
right way to handle this. It does give
[37:44]
us time to study it and for you all to
[37:47]
study the options and and adopt
[37:50]
regulations that fit the community. Mhm.
[37:53]
>> And then if we adopt regulations before
[37:55]
the one-year mark, does this still stay
[37:57]
in place for the full year or does it
[37:59]
expire upon adopting regulations?
[38:02]
>> It typically expires once you've adopted
[38:04]
resolution or um regulations. I think it
[38:07]
says that at the end it stays in place
[38:11]
until you've adopted regulations because
[38:13]
at that point you don't need to delay it
[38:15]
anymore.
[38:16]
>> Sure. Right.
[38:16]
>> I see that. Okay. [clears throat] Thank
[38:18]
you.
[38:18]
>> Thank you. So one year is the maximum
[38:20]
time we could do this, right? Yes,
[38:23]
>> typical
[38:24]
>> although I think it does provide and we
[38:27]
actually have this whole administrative
[38:28]
delay processes in our code and I think
[38:31]
it does allow for an extension of time
[38:34]
if necessary. I don't think we
[38:37]
anticipate that would be necessary but
[38:40]
it does allow the board to extend for
[38:42]
good reason.
[38:45]
>> I believe the county has a moratorum
[38:47]
right now too. Um I'm not sure how that
[38:50]
works. If there's a mortorium
[38:54]
that would also not have us be able to
[38:57]
put it in a data station too, right? It
[38:59]
protects us from that. Of course, I know
[39:01]
they can always drop that. I'm just
[39:02]
trying to understand the how that works.
[39:04]
>> The county's regulations have no impact
[39:06]
within the city.
[39:08]
>> Okay. Okay. Thank I'm not I've lost
[39:11]
track of what they're doing, but I know
[39:12]
they had a moratorum or something, but
[39:15]
>> they they don't have any authority
[39:17]
jurisdiction over our land use
[39:19]
regulations within the city,
[39:21]
>> but they would on the land just outside
[39:23]
of city limits.
[39:24]
>> Yes.
[39:24]
>> So, the uninorporated areas
[39:26]
>> as we make our decisions, that's good a
[39:28]
good thing to watch.
[39:29]
>> Right. Thank you for the clarification
[39:30]
because I assumed when they said they
[39:32]
had a mortorium that included the whole
[39:33]
county, but it's only for unincorporated
[39:35]
areas. Right.
[39:36]
>> Okay. Thank you.
[39:39]
That's good. Thank you. I didn't know.
[39:41]
>> Good discussion. Any other questions?
[39:49]
» I need a motion. Nope.
[39:52]
>> I make a motion to approve the
[39:54]
resolution establishing a one-year
[39:56]
administrative delay on the acceptance
[39:58]
and processing of applications related
[40:00]
to the establishment, construction,
[40:02]
expansion, or development of data center
[40:04]
facilities within the city of Oakrove.
[40:06]
>> I'll second it. We have a motion and a
[40:08]
second for a one-year administrative
[40:10]
delay on the acceptance and processing
[40:13]
of applications for data centers for the
[40:15]
city of Oakrove. Any discussion?
[40:19]
If not, all in favor say I.
[40:21]
>> I. Opposed. Motion passes. The next item
[40:25]
on the agenda is information reports.
[40:28]
Matt, do you have one?
[40:29]
>> No. Thank you, mayor.
[40:30]
>> Thank you. Chris or Jackson, do you have
[40:32]
one?
[40:33]
>> No report from me, mayor.
[40:34]
>> Thank you. Same. Yeah. Thank you, Chief.
[40:37]
Do you have one?
[40:37]
>> Yes, if I may take just a minute of your
[40:39]
time.
[40:39]
>> Yes.
[40:40]
>> Um, we hear so much about the negatives
[40:43]
regarding uh technology and the use of
[40:46]
law enforcement, big brother,
[40:47]
government, and such, but we miss the positives that come from that as
[40:52]
well because we get ran over by the
[40:54]
negatives. November [clears throat] of
[40:56]
24,
[40:58]
Oakrove officers stopped a vehicle
[41:00]
because it pinged on our automated
[41:02]
license plate readers. and in that
[41:04]
vehicle and the reason for the stop was
[41:06]
for a missing uh female from the state
[41:09]
of Utah.
[41:10]
>> She was recovered from that vehicle. She
[41:12]
had been carried across several state
[41:14]
lines and had been abused by her
[41:17]
abductor who was a 32-year-old Mexican
[41:19]
national. This past Thursday, July 30th,
[41:23]
Eric Santana Garcia, or also known as
[41:25]
Eric Katiano, was sentenced to 20 years
[41:28]
in federal prison without parole and
[41:30]
lifetime supervision for his
[41:32]
transporting a minor across state lines
[41:34]
with intent to engage in illegal sexual
[41:36]
activity, plus three other charges. I
[41:39]
think that's a that is a win-win. Um,
[41:42]
the young lady was actually present at
[41:45]
sentencing with her mother. And I think
[41:47]
that speaks volumes for why this is
[41:49]
important that we use technology to save
[41:52]
those who are are being abused, being
[41:54]
hurt, or those that are just running
[41:56]
from the system um that need to be
[41:58]
stopped. And when I got this notice that
[42:01]
he had been convicted, uh, I just think
[42:03]
that was a positive that needed to be
[42:05]
passed on in in open form because there
[42:08]
are positive uses for this this
[42:10]
technology. So, just want to pass that
[42:12]
on.
[42:13]
>> Thank you for sharing, Chief. Really
[42:14]
appreciate it.
[42:16]
>> Kim,
[42:18]
>> Scott,
[42:19]
>> just want to remind everybody that next
[42:21]
week will be the last full week for pool
[42:23]
operations and we'll go to weekends
[42:24]
only. So, it's all
[42:26]
>> ready.
[42:26]
>> Yeah.
[42:28]
>> Rachel,
[42:28]
>> no report. Bart,
[42:31]
>> um, I just like to thank the chief for
[42:32]
his report. I know I've heard lots of
[42:35]
different things on the radio and
[42:36]
everything else about you know lock
[42:39]
cameras and everything else and I think
[42:41]
to me most people are concerned when
[42:43]
this third party doing it as long as we
[42:46]
have good regulations of how things are
[42:49]
used like the cameras and such. Um I
[42:52]
think they're a positive thing and of
[42:54]
course we just need regulations to make
[42:56]
sure that they're done and carried out
[42:57]
in the right way. So, um, I think I will
[43:01]
say I think that the license plate
[43:03]
readers on the vehicles are a good
[43:04]
thing. So,
[43:06]
>> that's it.
[43:07]
>> Thank you, Bart. Tracy,
[43:08]
>> no report.
[43:09]
>> Thank you, Pam.
[43:10]
>> Yeah, I just want to say thank you to
[43:12]
the chief for giving us that update
[43:14]
because that um was heartbreaking when
[43:16]
it happened and it's wonderful to hear
[43:19]
that there's been some sort of
[43:21]
resolution. Thank you.
[43:22]
>> I agree. Yes. Thanks again, Chief. Uh,
[43:25]
the only report I have is tomorrow is
[43:26]
voter day. So, please get out and vote.
[43:30]
I'm looking for a motion to adjurnn.
[43:32]
>> I make a motion we adjourn.
[43:34]
>> Second.
[43:35]
>> We have a motion and a second to
[43:37]
adjurnn. Any discussion?
[43:39]
>> If not, all in favor say I.
[43:42]
>> I.
[43:42]
>> Opposed? We are adjourned.