1 00:00:45,840 --> 00:00:48,880 Billy, you're ready now. 2 00:00:50,520 --> 00:00:55,120 » Rock and roll. >> All right. 3 00:00:52,680 --> 00:01:00,560 » Call this meeting of the Grand County Airport Board 4 00:00:56,640 --> 00:01:00,560 in session. It's 4:00. 5 00:01:00,920 --> 00:01:08,760 And first order of business 6 00:01:04,800 --> 00:01:11,800 Oh, one bit bit of information. Van Horn says we have to leave early. 7 00:01:10,680 --> 00:01:15,920 » Okay. >> What I've heard. 8 00:01:13,080 --> 00:01:18,160 » Yeah, we have a hard out at 5:00. So >> Yeah. 9 00:01:17,160 --> 00:01:22,040 So So you know, we'll we'll try to I I 10 00:01:19,720 --> 00:01:28,040 don't see a reason why we can't do that. So first of all, citizens to be heard? 11 00:01:25,560 --> 00:01:32,680 » We have any have any citizens online or otherwise if you want to say 12 00:01:30,200 --> 00:01:32,680 something? 13 00:01:33,440 --> 00:01:39,960 » I guess not. All right. First order of business, approve the 14 00:01:37,200 --> 00:01:42,280 minutes from July 6th. Here a motion to 15 00:01:41,400 --> 00:01:44,720 approve? >> On the calendar. 16 00:01:43,040 --> 00:01:47,680 » To approve minutes from July 6th. >> I second. 17 00:01:45,560 --> 00:01:49,880 » Seconded by Dan. All in favor? 18 00:01:49,360 --> 00:01:53,760 » I I >> I 19 00:01:51,040 --> 00:01:53,760 » Unanimous. 20 00:01:54,080 --> 00:01:58,800 All right. On to the director's report. >> [clears throat] 21 00:01:57,360 --> 00:02:03,320 » I'm looking at the numbers on house and pets okay and go through that so I just 22 00:02:01,240 --> 00:02:07,800 talk a little bit first about a couple of incidents we had. 23 00:02:04,920 --> 00:02:11,720 We did have a disabled aircraft on the runway. 24 00:02:09,440 --> 00:02:14,440 Red tail moved quickly and we were able to get that off the runway without too 25 00:02:13,200 --> 00:02:18,360 much trouble. Although sky dive moment did have to 26 00:02:16,560 --> 00:02:23,520 land on the crosswind cuz they were in the air when it happened so um 27 00:02:21,360 --> 00:02:31,400 just that way I but it was resolved without incident. And it all went well. 28 00:02:28,000 --> 00:02:36,520 We also purchased a new um pod razor. I don't know if any of you 29 00:02:33,560 --> 00:02:40,840 have seen us dragging those around but it's thing we drag behind the truck and 30 00:02:37,880 --> 00:02:44,520 it just picks up all the gravel and fog. The one we had was starting to get 31 00:02:42,120 --> 00:02:48,480 pretty worn out so we thought we'd better buy a new one now 32 00:02:46,600 --> 00:02:50,600 while we had a little bit of revenue there. They're more expensive than I 33 00:02:49,760 --> 00:02:55,760 thought they were going to be. They were a couple of grand. So we bought another 34 00:02:53,640 --> 00:03:01,080 one but our plan is to use the one we currently have until it is just 35 00:02:58,440 --> 00:03:05,000 no longer functioning at all. And of course we've been using it quite 36 00:03:03,440 --> 00:03:08,000 a bit lately because all the construction there's been additional fog 37 00:03:06,880 --> 00:03:13,040 that we've had to go out and make sure we remove. And just remind all of you 38 00:03:10,480 --> 00:03:16,400 that if you get fog reports always please give us a call let us know so 39 00:03:14,880 --> 00:03:19,600 that we can get out and get after it as quickly as we can. 40 00:03:20,040 --> 00:03:26,800 We'll get into the uh construction. 41 00:03:27,640 --> 00:03:32,040 Let's go through the numbers please and then we'll start talking about the 42 00:03:30,000 --> 00:03:34,080 construction work so feel free to jump in. 43 00:03:34,440 --> 00:03:39,560 So again you can just check our takeoffs 44 00:03:37,720 --> 00:03:44,800 and landings versus 25 and 26 45 00:03:41,600 --> 00:03:49,239 and see that we've had a few more operations um 46 00:03:47,400 --> 00:03:54,200 Our operations have increased over last year. Not 47 00:03:51,280 --> 00:03:57,520 massively but a little bit. Days of the week, again, no surprises 48 00:03:56,400 --> 00:04:01,560 there. Um 49 00:03:58,960 --> 00:04:05,880 where our slow days are. Uh visiting versus based, and we are 50 00:04:04,280 --> 00:04:08,959 we're visiting out of Fort Lauderdale International Airport. It used to be 51 00:04:07,520 --> 00:04:11,840 that way. Although we did have a few more based 52 00:04:10,160 --> 00:04:17,120 out of that film this in this month's report than we 53 00:04:13,160 --> 00:04:22,840 we've had in the past, in comparison. They also have one way, surprises there. 54 00:04:20,000 --> 00:04:25,440 Tell which way the wind's blowing. Uh 55 00:04:23,400 --> 00:04:28,760 landing same thing, it's just whichever you're going and which one's all going 56 00:04:26,960 --> 00:04:33,320 around it. So, in plane minutes 57 00:04:31,160 --> 00:04:38,840 Um as you can see again, we continue to be uh below last year. 58 00:04:35,880 --> 00:04:43,600 Uh not altogether surprising as as a changeover has been 59 00:04:41,440 --> 00:04:45,680 made, and and people are changing their plans. 60 00:04:44,880 --> 00:04:50,040 Uh so, not shocked by it, but also I think 61 00:04:47,760 --> 00:04:54,080 it it held a little steadier this this month than than I thought it would as 62 00:04:51,600 --> 00:04:58,160 compared to the previous month. Um you know, this is the time of year 63 00:04:56,080 --> 00:05:01,200 when it starts to get hot as we've been talking about, so it doesn't quite get 64 00:04:59,840 --> 00:05:05,480 as many travelers coming in. 65 00:05:03,360 --> 00:05:11,760 Um red tails in plane minutes obviously up over last year, so they're doing more 66 00:05:07,800 --> 00:05:11,760 of their flights. Um 67 00:05:11,800 --> 00:05:16,919 Palm Tour in plane minutes down pretty significantly. 68 00:05:15,520 --> 00:05:20,040 Uh we've had I mean, 69 00:05:17,720 --> 00:05:23,160 Rachel could speak to this better, but there have been some cancellations and 70 00:05:21,280 --> 00:05:25,919 some different issues with with some of the flights. 71 00:05:24,600 --> 00:05:29,600 Although one of the cancellations did result in 72 00:05:27,720 --> 00:05:34,400 everybody getting to fly in pretty much a private jet. I was talking to a buddy. 73 00:05:32,200 --> 00:05:37,600 They they probably enjoyed that flight uh as much as any flight they're ever 74 00:05:35,840 --> 00:05:41,680 going to have. So, you can see that those are are going 75 00:05:39,760 --> 00:05:45,520 down. We would expect all of those to start picking up again as the 76 00:05:43,480 --> 00:05:50,680 temperature changes. Allegiant fuel sales well. They're 77 00:05:48,680 --> 00:05:54,120 they're doing pretty well with the lead. But if you look at the numbers on the 78 00:05:52,080 --> 00:05:57,040 front page, you'll see the difference between what we turn we make off of low 79 00:05:56,080 --> 00:06:01,960 lead versus 80 00:05:58,720 --> 00:06:06,600 the revenue that we get from jet and it's 81 00:06:03,880 --> 00:06:10,040 it's pretty massive. 10 times possibly. The jet fuel that we get 10 times the 82 00:06:08,760 --> 00:06:13,880 amount that we get from low lead. So our low lead 83 00:06:11,120 --> 00:06:17,640 fuels are strong despite the fact that we've had 84 00:06:15,280 --> 00:06:21,520 the uh construction project that we'll get to in a second just drag on and on 85 00:06:19,520 --> 00:06:25,280 and that has the policy problems with itself 86 00:06:23,760 --> 00:06:29,000 served um but 87 00:06:26,600 --> 00:06:33,120 we'll probably see most of that decline in next month's numbers if we see it at 88 00:06:31,520 --> 00:06:37,880 all. Uh and then jet A 89 00:06:35,400 --> 00:06:41,680 again, not a huge drop off over last year but still still down over time and 90 00:06:40,440 --> 00:06:46,960 again 10 times more jet A than by 100 low 91 00:06:44,919 --> 00:06:50,200 lead. So jet A is the lead. Really kind of where the money is for the airport. 92 00:06:49,640 --> 00:06:56,120 Uh and you can see that on the front. So 93 00:06:54,400 --> 00:07:00,080 if you just look at the actual raw numbers of fuel flow as you can see, you 94 00:06:58,280 --> 00:07:05,200 know 5,000 95 00:07:02,040 --> 00:07:12,320 bucks, 5,600 bucks off of uh low lead versus 18,000 off of jet A. 96 00:07:08,960 --> 00:07:16,280 It's clear that that jet fuel is they're both important but the jet fuel 97 00:07:14,160 --> 00:07:19,800 is where we generate the most revenue. So it's important that we keep that in 98 00:07:18,160 --> 00:07:24,360 mind. Uh with that, let's let's go into the 99 00:07:22,200 --> 00:07:28,600 pavement and the issues we've been having with um 100 00:07:26,120 --> 00:07:33,000 with current construction projects. How many of you have not been out there 101 00:07:29,919 --> 00:07:33,000 to see the projects? 102 00:07:33,040 --> 00:07:36,120 You have not been out? >> I'm not. 103 00:07:35,160 --> 00:07:38,760 » Okay. Um 104 00:07:37,240 --> 00:07:41,320 I'll let Jed speak to this but it should have been done. I don't And been ready 105 00:07:40,880 --> 00:07:44,280 for On >> 23rd. 106 00:07:42,880 --> 00:07:49,560 » We've been ready for it. We've been paid for a very long time. And 107 00:07:46,760 --> 00:07:53,480 uh for some reason LeGrand cannot get payment out to us. Supposed to be 108 00:07:52,160 --> 00:07:57,920 here today. But I'll believe it when I see it. 109 00:07:55,880 --> 00:08:02,160 Didn't make it today. So, we're going to start charging liquidated damages and uh 110 00:08:00,080 --> 00:08:05,800 judge will address that a little bit. >> So, yeah. The contracts are written for 111 00:08:03,760 --> 00:08:08,600 liquidated damages when they extend beyond 112 00:08:07,520 --> 00:08:13,160 uh the scheduled construction time. 113 00:08:11,640 --> 00:08:17,240 Um [clears throat] and it's not to say that any project should 114 00:08:14,800 --> 00:08:21,919 take longer or shorter. Here's the time allotted for a project, and then the 115 00:08:19,400 --> 00:08:26,480 bids go corresponding to that. So, a project could be 60 days, 116 00:08:24,360 --> 00:08:31,200 but it just as well could be scheduled for 30 days. Just expect to pay 50% more 117 00:08:29,919 --> 00:08:34,960 for that project because they're going to be working crews all the time. 118 00:08:33,240 --> 00:08:39,200 So, in this case, liquidated damages are put in the contracts 119 00:08:36,719 --> 00:08:46,240 such that um in this case of this project, it was a 45-day contract, 120 00:08:43,680 --> 00:08:50,240 and they were completely on schedule for that 121 00:08:47,400 --> 00:08:53,800 until being delayed for paving phase two. 122 00:08:51,120 --> 00:08:58,640 » And And we were we were being as kind about it as we possibly could 123 00:08:56,560 --> 00:09:04,080 because this contractor has done such a good job. They They really have. 124 00:09:01,280 --> 00:09:07,760 Um TS Casey's been great. They They had everything right to it right up 125 00:09:05,640 --> 00:09:11,760 until they subcontract to get the paving done, and that's when we have run into 126 00:09:09,320 --> 00:09:15,960 problems. Yeah. Could you elaborate on what happened out there today? 127 00:09:13,960 --> 00:09:19,440 » Uh today So, when 128 00:09:17,560 --> 00:09:24,560 before paving happens, they deliver what's called a mix design. So, there's 129 00:09:21,640 --> 00:09:29,520 certain specs that say, "Here's how many sand versus small gravel versus slightly 130 00:09:26,800 --> 00:09:32,080 bigger gravel with percentages of oil." And it has to meet certain 131 00:09:30,480 --> 00:09:36,720 specification. And they did that, and what they submitted was going to be a 132 00:09:35,000 --> 00:09:41,040 good pavement section. Uh 133 00:09:38,760 --> 00:09:47,480 what showed up in the trucks today was So, trucks did come out today. 134 00:09:44,320 --> 00:09:53,120 And uh what showed up was not what it was designed, and it was very can't be 135 00:09:51,120 --> 00:09:56,640 accepted. It was actually And it was to a point where we didn't even have to 136 00:09:54,240 --> 00:10:01,600 push hard because we were not going to accept it. Uh but they also recognized, 137 00:09:59,880 --> 00:10:05,160 "Yeah, this isn't good asphalt. We don't want to put it 138 00:10:03,120 --> 00:10:08,280 down." Because they know if they had put it down, 139 00:10:06,520 --> 00:10:10,880 we'd be talking about a rework. >> Yeah, do you know will they be back 140 00:10:10,200 --> 00:10:16,360 tomorrow? >> The plan is to be on site first thing in 141 00:10:14,480 --> 00:10:21,440 the morning paving. As it was today, as it was last week 142 00:10:19,560 --> 00:10:25,200 twice, as it was the week before. >> Okay. Well, this has been very 143 00:10:23,360 --> 00:10:29,160 disruptive to our operations. >> Well, we have the hangar blocked yet and 144 00:10:28,200 --> 00:10:32,320 self-serve. >> I still would like them to do it in two 145 00:10:30,760 --> 00:10:37,040 lifts, though. I can't try and do it >> No, the the plan is still for two lifts. 146 00:10:34,880 --> 00:10:40,400 So, for you know, obviously you always want to 147 00:10:38,280 --> 00:10:43,200 work well with a contractor, um but you also have certain 148 00:10:41,680 --> 00:10:46,320 stipulations. Uh 149 00:10:44,360 --> 00:10:50,680 the original plan on phase one So, they're working on phase two now. Phase 150 00:10:48,320 --> 00:10:54,320 one is to do a lift and then come back the next day and do a 151 00:10:52,520 --> 00:10:57,960 second lift. Um 152 00:10:55,640 --> 00:11:03,360 they had, they being the subcontractor, had difficulties with their plant and 153 00:11:00,040 --> 00:11:10,000 were unable to work on the first day, do the first day of paving, uh which 154 00:11:05,760 --> 00:11:14,200 corresponded to July 2nd. Um 155 00:11:11,480 --> 00:11:16,360 and or maybe the finishing >> Was it decided that they 156 00:11:15,920 --> 00:11:22,080 » But they did >> decided then to do instead of two lifts, 157 00:11:18,520 --> 00:11:26,520 lift at I did it all in one day. >> And so, the first lift was great. 158 00:11:24,440 --> 00:11:31,160 The second lift was not because they did it all in one day. 159 00:11:28,600 --> 00:11:37,360 It counted as one day of one production lot instead of having two separate days, 160 00:11:33,560 --> 00:11:42,840 two separate lots. And the asphalt, it has a range where you want to make it 161 00:11:40,040 --> 00:11:46,080 you have, you know, here's bad, here's perfect, and you can be a little bit 162 00:11:44,760 --> 00:11:48,880 more than perfect, but it has to fall within this range. 163 00:11:47,880 --> 00:11:51,720 Now, and 164 00:11:49,960 --> 00:11:56,600 it can fall right to the bottom of that range, but if it's below that, 165 00:11:54,120 --> 00:12:03,440 everything is perfect. If it's below that, you can get um 166 00:11:59,680 --> 00:12:07,760 deductions in what gets paid out. Um when you do multiple lifts, multiple 167 00:12:05,800 --> 00:12:12,320 days, what that enables them to do is today they only get paid 90%, but 168 00:12:10,760 --> 00:12:16,640 tomorrow they went above and beyond, so they get 106%. They'll never pay get 169 00:12:14,360 --> 00:12:17,760 paid more than 100%. But 170 00:12:17,280 --> 00:12:21,520 » For the total. >> For the total. 171 00:12:19,120 --> 00:12:25,720 But in this case, that first lift, they got paid 50%. 172 00:12:23,200 --> 00:12:29,240 So, we're deducting $133,000 173 00:12:28,160 --> 00:12:33,720 of payment to TSJ, which would then be 174 00:12:32,480 --> 00:12:37,800 passed down to the government. >> Just so you're aware, the the the 175 00:12:35,360 --> 00:12:41,360 payment did not fail. It was just at the lower end of passing. 176 00:12:39,920 --> 00:12:44,640 So, had it failed, we would have just had them tear it out. The problem is 177 00:12:43,200 --> 00:12:48,600 because they did it all in one day, we couldn't have just had them tear off the 178 00:12:46,160 --> 00:12:52,480 4 in that that didn't work out very good. It had now all mixed together. 179 00:12:50,480 --> 00:12:56,600 They would have had to take out all 8 in. 180 00:12:53,640 --> 00:13:00,760 Um and because the 4 in on the bottom was so good, 181 00:12:58,440 --> 00:13:03,560 um we feel like it's it's it's okay to have it at the low end of 182 00:13:02,640 --> 00:13:05,720 good. So, 183 00:13:04,680 --> 00:13:10,640 we wouldn't have passed it if it had failed. But it is going to save us uh 184 00:13:08,520 --> 00:13:14,040 quite a bit of money over the course of the project, which is good because we've 185 00:13:12,520 --> 00:13:19,839 had a couple of change orders that we've had to uh put in on the previous 186 00:13:16,720 --> 00:13:22,920 project, such as the manhole covers. Um you know, there's just been some 187 00:13:21,120 --> 00:13:27,400 little things, pipes, the additional piping. So, as it turns out, even with 188 00:13:25,600 --> 00:13:31,480 the change order showing that we're paying more at the end of the day 189 00:13:29,800 --> 00:13:35,960 actually the county share is going to be less than was projected. We will have 190 00:13:33,440 --> 00:13:40,000 saved money over the whole course of the project. 191 00:13:37,560 --> 00:13:45,760 » Um in terms of what is scheduled, tomorrow morning start paving and do the 192 00:13:42,760 --> 00:13:49,120 first lift. Okay. It will be compacted, it'll be tested, and it'll be a 193 00:13:47,760 --> 00:13:53,280 standalone lot even though it's technically 194 00:13:50,200 --> 00:13:57,360 really really small for one lot. Uh the lot being the tons of pavement 195 00:13:56,200 --> 00:14:03,280 going in. Uh and then the intent is Wednesday do 196 00:14:00,680 --> 00:14:09,600 day number two of paving where they will pave that top 197 00:14:04,800 --> 00:14:14,080 lot and then uh ideally get things open as quick as possible after that. In term 198 00:14:11,840 --> 00:14:17,320 quick as possible would be looking at Thursday or Friday. 199 00:14:16,720 --> 00:14:22,080 » So this appears >> And so how far behind schedule are they? 200 00:14:19,360 --> 00:14:26,600 » Right now they're 11 days over schedule. >> The big difference was 201 00:14:24,160 --> 00:14:29,560 weeks. >> It was not as impactful there because it 202 00:14:28,080 --> 00:14:34,480 was all in it was out in the middle of nowhere. So it wasn't in the middle 203 00:14:32,480 --> 00:14:37,400 blocking businesses, blocking the access of the ARFF truck to the 204 00:14:36,520 --> 00:14:40,360 runway. >> It wasn't any place where you could I 205 00:14:38,720 --> 00:14:45,200 mean you can assign liquidated dam- damages just tentatively, 206 00:14:42,600 --> 00:14:48,520 but there were no actual damages because it was all brand new stuff that we 207 00:14:46,440 --> 00:14:53,880 hadn't had before. Whereas this there are actual damages being incurred. 208 00:14:51,480 --> 00:14:58,839 Um so yeah, we told them today when it didn't show up that 209 00:14:55,600 --> 00:15:02,240 liquidated damages would be assessed. So >> And 210 00:15:00,040 --> 00:15:09,760 it does will go to the prime contractor. Uh 211 00:15:06,120 --> 00:15:13,440 the that is their purview or not to pass it on to their pavement contractor same 212 00:15:11,960 --> 00:15:18,120 as with the uh reduction in pay for the asphalt. We 213 00:15:16,640 --> 00:15:24,200 don't get a You don't get a bill that we process 214 00:15:20,560 --> 00:15:29,960 uh from LaGrande for doing the paving. They give it to TSJ, TSJ gives it to 215 00:15:27,240 --> 00:15:32,240 you, we process it with that payment to that payment. 216 00:15:31,640 --> 00:15:36,120 Uh, >> And for that reason, we we tried to be 217 00:15:34,000 --> 00:15:41,360 as nice about this possible cuz TSJ has been so good to to work with, but um, 218 00:15:39,680 --> 00:15:45,760 the LeGrand's portion of it has not worked out very well. 219 00:15:43,360 --> 00:15:51,720 For the second project in a row. >> And ancillary to that, uh, TSJ actually 220 00:15:49,120 --> 00:15:56,800 is entering by next season they're also entering 221 00:15:54,160 --> 00:15:59,800 into the, uh, pavement manufacturer and production and layout. 222 00:15:59,120 --> 00:16:01,040 So, they're going to have their own pavers. 223 00:16:00,280 --> 00:16:04,080 » That's good. >> Or 224 00:16:01,840 --> 00:16:07,520 uh, as we talked to Adam, so um, 225 00:16:05,280 --> 00:16:13,280 it just makes another player in this region of the state which benefits 226 00:16:10,040 --> 00:16:18,640 everything from city streets to um, there always. 227 00:16:15,680 --> 00:16:21,600 » Any questions on the on the project? Before I go back and talk about 228 00:16:20,200 --> 00:16:25,960 something I forgot to talk about, but I just I was down here. We did have a weed 229 00:16:23,360 --> 00:16:28,760 spraying incident as well. Um, 230 00:16:26,800 --> 00:16:33,760 apparently the the handle of the weed sprayer that we used popped off, the 231 00:16:30,960 --> 00:16:38,120 hose got loose inside one of our trucks. Hosed down the truck, sprayed JP 232 00:16:36,120 --> 00:16:40,480 completely with, um, with herbicide. 233 00:16:39,760 --> 00:16:44,960 Uh, Mark got on the phone with everybody 234 00:16:42,280 --> 00:16:47,720 that we could possibly think of to find out if there was any risk or danger to 235 00:16:46,480 --> 00:16:51,200 anybody. Um, and then we contacted the county 236 00:16:49,680 --> 00:16:54,400 weed uh, department, and they were supposed to 237 00:16:52,839 --> 00:16:57,800 come do training, but they haven't done it yet. They're going to come out, look 238 00:16:55,800 --> 00:17:00,880 over our equipment, see if there's maybe a better quick connect we can have, 239 00:16:59,400 --> 00:17:04,280 something to make sure that that doesn't happen again while we're spraying weeds. 240 00:17:03,240 --> 00:17:07,480 Um, just to make sure that we're doing all 241 00:17:05,640 --> 00:17:13,079 the training that we can cuz it could have been bad. Luckily JP was wearing 242 00:17:10,240 --> 00:17:17,400 PPE, so he didn't get hit right in the face with it, but he would have, um, had 243 00:17:15,360 --> 00:17:21,800 he not had the goggles on and and been doing what he was supposed to do. So, 244 00:17:19,680 --> 00:17:25,000 um, yeah, so I I wanted to make you aware of 245 00:17:23,280 --> 00:17:28,439 that that that what we're doing just I think that we did in the incident. We 246 00:17:26,520 --> 00:17:32,320 got the truck cleaned out. We're still waiting to find out, um, 247 00:17:30,720 --> 00:17:36,400 whether the fumes cuz it's soaked into the cloth seats 248 00:17:34,000 --> 00:17:39,440 whether we need to replace those seats or whether it's okay for us to continue 249 00:17:37,880 --> 00:17:45,160 using that vehicle. Um, and if any of you have 250 00:17:42,520 --> 00:17:49,000 any contact, we've called Embry-Riddle. We put the guy that can't get a 251 00:17:46,960 --> 00:17:52,880 completely straight answer, but we get if we just put vinyl covers over those 252 00:17:50,760 --> 00:17:57,960 seats, they'll probably be okay. Um, but that's why you won't see the one 253 00:17:55,640 --> 00:18:01,280 vehicle out doing weed spray much. And you might see it parked out in the sun 254 00:17:59,760 --> 00:18:06,640 with the doors open while we just kind of let things kind of bake and see if we 255 00:18:04,080 --> 00:18:11,440 can't clear it out a little bit. Um, as far as land side goes, it's just 256 00:18:08,280 --> 00:18:16,240 been regular maintenance. Um, mostly just, uh, 257 00:18:13,160 --> 00:18:19,560 weeds and also terminal cleaning. Um, 258 00:18:17,320 --> 00:18:24,800 we haven't had the Sky Harbor Moab people in our bathrooms anymore, so 259 00:18:22,520 --> 00:18:28,000 they took care of that issue for us. So, our people haven't had to go in and 260 00:18:25,920 --> 00:18:31,840 clean up behind them. And, uh, still working on those minimum 261 00:18:29,800 --> 00:18:35,280 standards and release agreements with our county attorney. Uh, 262 00:18:33,760 --> 00:18:39,880 again, I think as we talked about before, leases are pretty much kind of 263 00:18:38,080 --> 00:18:42,720 not much we can do with them, uh, the way that we can adjust the way 264 00:18:41,280 --> 00:18:46,520 those leases work is through minimum standards and rules and regs. So, we're 265 00:18:44,600 --> 00:18:51,720 still trying to piece together each section that needs to be rewritten and 266 00:18:48,720 --> 00:18:54,880 we definitely don't want to like, uh, reinvent the wheel. There are there are 267 00:18:53,360 --> 00:18:58,560 airports that have good minimum standards in place. So, we're kind of 268 00:18:57,080 --> 00:19:01,720 looking at other minimum standards of similar airports. 269 00:19:00,080 --> 00:19:05,640 Uh, and when I have something to show you, I will and then we'll start doing 270 00:19:03,480 --> 00:19:10,240 some some public meetings about everybody contributing something to to 271 00:19:08,320 --> 00:19:13,000 what they feel about it as well. I think that's important. 272 00:19:14,240 --> 00:19:20,240 That's where we are. >> Can I ask you a question? 273 00:19:17,520 --> 00:19:23,200 The lights on the new around the outside, 274 00:19:21,520 --> 00:19:26,000 when will they when will they be used and what are they for? 275 00:19:25,200 --> 00:19:29,600 » The ramp lights? >> Yeah. 276 00:19:26,360 --> 00:19:34,160 » Okay, well we just barely got the uh 277 00:19:31,520 --> 00:19:37,600 meter in, so they're usable now. Just ramp lighting. 278 00:19:35,560 --> 00:19:41,000 Uh we we do have two of them that are in a place that makes it kind of difficult 279 00:19:39,160 --> 00:19:46,080 for the helicopters. Some helicopter pilots are for landing on the helicopter 280 00:19:43,160 --> 00:19:49,240 pads, some are not. But yeah, it's just ramp lighting if anybody is out there at 281 00:19:47,720 --> 00:19:52,680 night bringing their aircraft in. >> How do you turn them on? 282 00:19:51,440 --> 00:19:56,400 » They go on automatically. >> Oh, so they're on all night. So I 283 00:19:54,600 --> 00:19:59,640 thought I I drove by the airport at midnight last night and they were on. 284 00:19:58,120 --> 00:20:02,800 They were lit up like a Christmas tree. >> Now that was one thing I was going to I 285 00:20:01,000 --> 00:20:06,080 kind of mention is there's like two different color lights. Like the 286 00:20:05,080 --> 00:20:08,280 » Of the new ones? >> Yeah. Like 287 00:20:07,200 --> 00:20:10,640 » Are you sure it's not just the angle you're looking at? 288 00:20:09,160 --> 00:20:15,800 » Well, no the other ones are kind of orangish, you know, kind of um 289 00:20:13,520 --> 00:20:19,520 orange color and then the new ones are bright white, you know, like you can 290 00:20:17,960 --> 00:20:21,600 definitely see um 291 00:20:20,160 --> 00:20:23,640 » All the new ones should be the same though. 292 00:20:22,240 --> 00:20:27,160 » Yeah, the new ones are all the same, but they just don't match. They just don't 293 00:20:24,880 --> 00:20:30,880 match the other light giant or the other um 294 00:20:27,800 --> 00:20:34,560 » The lenses are lenses. >> Which isn't a big deal, but it was 295 00:20:33,200 --> 00:20:37,000 it was definitely um >> They're different kinds of bulbs. 296 00:20:35,680 --> 00:20:40,000 » Yeah, different kinds of bulbs cuz they had to meet local lighting standards cuz 297 00:20:39,120 --> 00:20:44,720 of the dark sky light requirements for lumens 298 00:20:42,640 --> 00:20:46,600 and stuff like that. That's within the codes now. 299 00:20:45,520 --> 00:20:50,760 » So the new lights definitely >> The old lights don't perform dark sky 300 00:20:48,960 --> 00:20:55,680 best I can tell. >> And the ones with the helicopter, we are 301 00:20:52,840 --> 00:20:59,520 aware so they weren't designed and there's 302 00:20:56,800 --> 00:21:02,880 the leap legally laid out which is what they are not being 303 00:21:01,280 --> 00:21:07,800 too close to the runway to impede on runway airspace, but it is designed for 304 00:21:05,400 --> 00:21:10,680 a hover taxi. The way a helicopter There's The way helicopters should fly 305 00:21:09,760 --> 00:21:13,960 and there were It was the way helicopters do fly. 306 00:21:12,840 --> 00:21:19,200 So, those are laid out for how a helicopter should fly. As a helicopter 307 00:21:16,360 --> 00:21:23,760 comes into the airport, it should land on the runway. So, come down, approach 308 00:21:21,640 --> 00:21:27,040 the runway, doesn't have to touch down, but then hover taxi. 309 00:21:25,640 --> 00:21:31,520 And that's why there are those lead-in lines with the numbers that are painted 310 00:21:29,120 --> 00:21:35,240 on them are described for to specifically lead-in line and the size 311 00:21:33,160 --> 00:21:37,920 of helicopters that can fit into that location. 312 00:21:36,360 --> 00:21:41,120 Now, if someone wants to fly direct to them, yeah, there's going to be some big 313 00:21:39,480 --> 00:21:43,440 holes in the middle of it. >> I didn't mean to suggest that they 314 00:21:42,200 --> 00:21:47,960 weren't put in the right place. >> No, but it But, it does look like 315 00:21:45,960 --> 00:21:52,040 It absolutely looks like, "Why are they there?" Because someone can't fly 316 00:21:49,920 --> 00:21:55,840 directly to it. Well, part of that deals with 317 00:21:53,120 --> 00:22:00,960 um you know, addressing fog. Helicopter that is not paved to the 318 00:21:58,840 --> 00:22:04,040 north and to the west of those uh 319 00:22:01,560 --> 00:22:07,640 helicopter parking spots, so if they came in direction of that, it 320 00:22:05,840 --> 00:22:11,640 would be blowing a lot of fog onto the taxiway and onto the helicopter parking 321 00:22:10,040 --> 00:22:15,120 spots. And then once they land, it's going to push out and hit every plane 322 00:22:12,960 --> 00:22:19,480 around. But, if they land on the runway, hover taxi over the taxiway, and use the 323 00:22:17,720 --> 00:22:24,000 lead-in lines, then they can rotate around. 324 00:22:21,480 --> 00:22:25,760 » a decent fog removal tool when they >> Exactly. 325 00:22:25,120 --> 00:22:27,640 » Yeah, they >> And so, 326 00:22:26,280 --> 00:22:31,520 » Unfortunately, about the only people that follow that are the military 327 00:22:29,840 --> 00:22:36,160 because of how much air they blow around. But, the the thing I worry about 328 00:22:33,760 --> 00:22:40,920 if somebody does come in from the west with the hoods on those lights, they 329 00:22:37,920 --> 00:22:45,240 block the night sky. Uh they may not see them. Uh there are red lights on the 330 00:22:43,080 --> 00:22:48,800 other side of the lines on the other side of the runway. I do worry about 331 00:22:47,200 --> 00:22:54,320 somebody coming in there at night. >> Like I said, I'm 332 00:22:50,520 --> 00:22:58,000 It It It meets every FAA specification. Whether or not we want to keep those 333 00:22:55,800 --> 00:23:01,640 there long-term, we can discuss. >> I think 334 00:22:58,560 --> 00:23:05,240 » One possibility maybe is uh if they're not 335 00:23:03,160 --> 00:23:08,640 legally tall enough to need striping, but 336 00:23:06,400 --> 00:23:12,720 you know, the red and white Christmas, you know, candy cane 337 00:23:10,920 --> 00:23:14,440 candy cane those poles >> And for some reason they're reflective. 338 00:23:13,840 --> 00:23:16,560 » They're reflective. >> They're reflective. 339 00:23:15,000 --> 00:23:19,640 » I mean, if you're coming from the east, they're pretty visible because of the 340 00:23:18,320 --> 00:23:23,200 way the lights are, but when you're coming from the west, they're 341 00:23:20,960 --> 00:23:26,880 » And the downside and the reason military will fly appropriately when they have 342 00:23:26,400 --> 00:23:28,960 to. >> Yeah. 343 00:23:27,200 --> 00:23:33,400 » Uh but also uh a lot of times they'll be flying 344 00:23:30,120 --> 00:23:35,920 under night vision. And those lights, you're not going to pick 345 00:23:34,960 --> 00:23:37,280 them up in thermal. >> Oh. 346 00:23:36,440 --> 00:23:38,760 » Because they're >> LED. 347 00:23:37,760 --> 00:23:42,960 » They're LED. They're not going to put off the heat to pick up thermal. We're 348 00:23:40,640 --> 00:23:46,320 actually seeing that across the board with all of uh approach lights like 349 00:23:45,040 --> 00:23:49,800 copies. They used to be highly visible in 350 00:23:47,880 --> 00:23:52,840 thermal, but now they're not. Because 351 00:23:51,000 --> 00:23:55,120 they're not putting off any heat. >> So, they don't 352 00:23:53,240 --> 00:23:57,160 » So, definitely aware and 353 00:23:55,400 --> 00:23:59,720 » They'll get heaters inside of it because they don't know the size. 354 00:24:00,560 --> 00:24:04,200 » Then I have one one lease question also. >> Yeah. 355 00:24:03,600 --> 00:24:08,120 » Uh all of the leased buildings went out 356 00:24:06,840 --> 00:24:11,960 this month. Uh do you get to review all those before 357 00:24:10,120 --> 00:24:14,760 they go out? >> No. 358 00:24:13,280 --> 00:24:17,320 At least I haven't. I probably could request that I get them before they go 359 00:24:16,920 --> 00:24:21,320 out. >> Yeah, I think we probably should. 360 00:24:19,000 --> 00:24:25,480 » You know, there are budgets. What we get and we're trying to correct this with 361 00:24:23,040 --> 00:24:29,160 the way finance reports to us is we get [clears throat] 362 00:24:26,440 --> 00:24:34,080 a lump billing. This is what we bill and then Sarah's had to actually go in and 363 00:24:31,280 --> 00:24:37,800 ask for a breakdown. Who was billed and when? Otherwise, it just kind of goes 364 00:24:35,560 --> 00:24:40,200 out. So, we're trying to correct that problem right now. 365 00:24:38,560 --> 00:24:46,880 » Yeah, but I'm not sure what I what I'm seeing is maybe not unclear on um the 366 00:24:44,480 --> 00:24:50,320 number of cents per square foot. Okay. Uh and I'm just wondering who 367 00:24:48,640 --> 00:24:53,640 figures that out and how they figure that out. 368 00:24:52,520 --> 00:24:57,480 » Well, most of the leases that are already signed were were 369 00:24:55,720 --> 00:25:00,120 were signed based on the square footage at the time. 370 00:24:58,160 --> 00:25:06,240 » yeah, yeah, they are. But the question is is who does that work? 371 00:25:02,040 --> 00:25:11,400 » Well, for all new leases it'll be me. >> Okay, so so you tell them 372 00:25:08,800 --> 00:25:14,360 it's 23 cents a square foot on And this is how many square footage it 373 00:25:12,880 --> 00:25:17,880 is. It's this much and >> That's the one that's the same on all 374 00:25:16,800 --> 00:25:20,760 That's one of the things we want to adjust with our fee schedule is to make 375 00:25:20,200 --> 00:25:23,680 sure that >> I'm not sure that's true. 376 00:25:21,960 --> 00:25:27,560 » the leases Well, they're it's not true right now. 377 00:25:24,880 --> 00:25:30,280 » I I understand. Okay, so I don't What are you trying to get? 378 00:25:28,760 --> 00:25:33,680 » Okay, I'm just trying to figure out our our process of understanding whether the 379 00:25:32,320 --> 00:25:36,440 right amount's being charged. Okay, when somebody comes in for a new lease, we 380 00:25:35,000 --> 00:25:40,760 take what's on our fee schedule, the last time that it was updated, then we 381 00:25:38,560 --> 00:25:46,560 add the CPI increases based on the government CPI. And so what that comes 382 00:25:43,880 --> 00:25:50,520 out to is what we charge per square foot. Then we look at what then we look 383 00:25:48,960 --> 00:25:53,520 at what the size of the footprint of the building is and we charge them for the 384 00:25:52,560 --> 00:25:57,680 footprint of the building. >> Okay, and you so you you do that 385 00:25:55,480 --> 00:25:59,080 calculation and send it to the county. 386 00:25:58,240 --> 00:26:00,960 » Yes. >> To be That was my question. How does 387 00:26:00,440 --> 00:26:04,680 that work? >> Oh, yeah. Yeah, as we do new leases, 388 00:26:03,160 --> 00:26:07,400 that's the way that they will be done. >> Yeah. Are they Are they done that way 389 00:26:06,480 --> 00:26:11,760 now? >> Yeah. I don't want to talk about how how 390 00:26:10,160 --> 00:26:14,240 they were done before I got here. We haven't We haven't 391 00:26:13,120 --> 00:26:18,800 » The two that >> The two that I've had since I got here 392 00:26:16,520 --> 00:26:23,200 were already written and agreed upon before I got here. But the ones that we 393 00:26:20,880 --> 00:26:25,000 do from here on out will be done exactly the way I just told you. 394 00:26:24,200 --> 00:26:28,680 » Great, thank you. >> The because one of the problems that we 395 00:26:26,600 --> 00:26:32,080 discovered was no two people in the airport pay the same. 396 00:26:30,320 --> 00:26:36,400 It doesn't feel like anybody's paying the same amount and I 397 00:26:33,720 --> 00:26:39,840 want to standardize that through our fee schedule and our middle seat. 398 00:26:37,800 --> 00:26:40,760 » So that begins probably next year then. >> Yeah. 399 00:26:40,440 --> 00:26:43,040 » Okay. >> Or as soon as we can get it. As soon as 400 00:26:42,240 --> 00:26:45,760 we can get it done. >> Because this this year's already 401 00:26:44,320 --> 00:26:47,680 happened, I think. So. >> Yeah. 402 00:26:46,200 --> 00:26:49,960 » Okay, got it. Thank you. 403 00:26:48,280 --> 00:26:56,400 » You're welcome. >> Uh okay. 404 00:26:52,520 --> 00:27:01,000 You That's That's a Okay. You know? >> Yeah, there's not a ton going on at the 405 00:26:58,760 --> 00:27:04,560 county right now. I might as well say that we're getting ready to start our 406 00:27:02,360 --> 00:27:09,520 internal audit. And that will be on restricted funds, so 407 00:27:07,120 --> 00:27:12,480 that will affect and that will dig into the funds at the airport. 408 00:27:11,080 --> 00:27:13,840 » They contacted me about it. >> They did already? 409 00:27:13,360 --> 00:27:16,840 » They were ready. >> Great. 410 00:27:14,320 --> 00:27:21,400 » Julie or somebody from this firm. >> Perfect. So, that'll be ongoing and 411 00:27:18,760 --> 00:27:25,800 that's not just the airport, but the internal audit will look at all of the 412 00:27:23,520 --> 00:27:28,640 restricted funds, but the one that really affects us at the 413 00:27:27,280 --> 00:27:30,840 airport here, so >> Yeah, no, we're happy to have them do 414 00:27:29,920 --> 00:27:33,440 it. It'll It'll help us with 415 00:27:31,680 --> 00:27:37,960 » Make sure the funds stay at the airport that are generated at the airport. 416 00:27:36,000 --> 00:27:43,120 » Yeah. >> Yeah, not much going on. It's hot. 417 00:27:39,960 --> 00:27:43,120 Everything's slow. 418 00:27:44,360 --> 00:27:48,920 All I got. >> Is that it? 419 00:27:47,040 --> 00:27:52,280 » Uh, a few things in the city. Um, the city is still working on on our water 420 00:27:50,720 --> 00:27:56,240 tank project. Because I had to come back to the county um, for some public 421 00:27:55,320 --> 00:27:57,560 hearings that um >> Tomorrow? 422 00:27:57,040 --> 00:27:59,880 » Tomorrow. >> Yeah. 423 00:27:57,800 --> 00:28:04,160 » Okay. For some public hearings that needed to be addressed, so that's going 424 00:28:02,040 --> 00:28:07,800 to happen tomorrow. Then hopefully the commission will make a They'll make a 425 00:28:05,720 --> 00:28:13,880 decision at that time on the water tank. Um, the city did implement um, an 426 00:28:11,520 --> 00:28:16,840 ordinance um, for watering times, you know, um 427 00:28:15,280 --> 00:28:21,840 that's going to be citywide. That only involves um, the 428 00:28:19,880 --> 00:28:26,160 Moab city culinary water that's used for watering lawns, you know, or outside 429 00:28:23,480 --> 00:28:32,880 irrigation. That you can't water from 10:00 a.m. um, to 6:00 p.m. And then 430 00:28:29,680 --> 00:28:36,600 that You can water after 6:00 p.m. and um, 10:00 a.m. each day. So, and that 431 00:28:35,360 --> 00:28:40,440 only involves culinary water. So, it doesn't involve lawn irrigation or 432 00:28:38,360 --> 00:28:44,520 wells, you know, or anything like that. So, 433 00:28:41,120 --> 00:28:47,280 um and then um and [clears throat] then we also 434 00:28:45,000 --> 00:28:53,720 approved a a $1.2 million dollar contract um to do a bunch of upgrades on 435 00:28:51,320 --> 00:28:57,960 the M-track on the pool um and on the city building which you 436 00:28:56,200 --> 00:29:00,640 know um is 437 00:28:59,200 --> 00:29:03,400 you know the pool's um 438 00:29:01,640 --> 00:29:07,720 starting to get a little bit age and then things are starting to kind of fall 439 00:29:05,120 --> 00:29:12,920 apart there so a lot of things like recoding pipes, putting in new pipes, um 440 00:29:10,360 --> 00:29:19,720 putting in new boilers, you know, um putting in um new lights, putting in um 441 00:29:16,960 --> 00:29:22,800 um the bathrooms never had ventilation systems, you know, so especially like 442 00:29:21,440 --> 00:29:27,120 the showers and stuff were never ventilated so it was just growing black 443 00:29:25,040 --> 00:29:31,960 mold, you know, and stuff so this will go in and they're going to put in um 444 00:29:29,520 --> 00:29:37,280 bands and vents to to kind of protect that and make it so that it's 445 00:29:34,840 --> 00:29:42,040 better smell smell better smell better, yeah, smell better and not worry about 446 00:29:39,280 --> 00:29:44,680 getting the black mold. Um so um 447 00:29:43,720 --> 00:29:48,000 so it's that's also to be done. 448 00:29:46,840 --> 00:29:52,400 I think basically that will be done by December stuff so a lot of big stuff 449 00:29:50,560 --> 00:29:55,840 there. There's a lot of a lot of stuff that needs to be put into the pool you 450 00:29:54,320 --> 00:30:01,080 know kind of our 451 00:29:56,800 --> 00:30:01,080 and yeah, that's about it. 452 00:30:01,120 --> 00:30:06,680 » Pardon? >> We didn't have a meeting last month so I 453 00:30:03,680 --> 00:30:06,680 have no report. 454 00:30:08,120 --> 00:30:11,080 » Judge Did we proceed anything but it covered 455 00:30:10,480 --> 00:30:13,680 that all >> I covered it. The only other thing 456 00:30:12,720 --> 00:30:17,640 that's with ongoing projects 457 00:30:15,920 --> 00:30:23,200 are working with the FA to push the entrance road uh to next year 458 00:30:19,920 --> 00:30:28,840 construction uh and bidding and whatnot um and then the fire truck it's being 459 00:30:26,600 --> 00:30:33,520 the truck itself is being built and there's been a lot of traffic over the 460 00:30:30,720 --> 00:30:40,480 last week uh got everything of the Buy American clauses cleaned up for the 461 00:30:36,800 --> 00:30:45,280 equipment. So there were technically two projects bid for the fire truck, number 462 00:30:42,680 --> 00:30:50,920 one, fire truck number two, everything that goes into a fire truck, tanks, 463 00:30:48,000 --> 00:30:55,400 um hoses, axes, uh special fire extinguisher stuff like 464 00:30:52,680 --> 00:31:00,480 that. Uh Oshkosh is building the truck, Rosenbauer is doing the equipment. 465 00:30:58,280 --> 00:31:04,520 We got everything all worked out now. And uh 466 00:31:01,720 --> 00:31:09,720 they will be looking to get a payment 467 00:31:06,600 --> 00:31:11,920 or an invoice from the county. >> I'll get that. 468 00:31:11,560 --> 00:31:15,040 So >> That's the one. 469 00:31:13,080 --> 00:31:18,480 » And Mark will go back there during the construction, also. 470 00:31:17,000 --> 00:31:22,960 During the final phase of construction, we'll send Mark back to Oshkosh to look 471 00:31:21,120 --> 00:31:27,600 over the final product. That's just how it's always done. 472 00:31:25,160 --> 00:31:31,640 » They'll they'll get an invoice from the county. I don't understand. I 473 00:31:30,040 --> 00:31:33,400 would think that the county would get an invoice. 474 00:31:32,240 --> 00:31:37,400 » County getting that payment. >> Oh, now it's it's getting that process. 475 00:31:36,240 --> 00:31:41,280 » They'll bill the county. >> Yeah, and then it can be up to the 476 00:31:39,600 --> 00:31:45,200 limit. They won't You can't 477 00:31:42,840 --> 00:31:49,680 bill until stuff is delivered with a caveat on stuff like this where 478 00:31:47,920 --> 00:31:54,440 they can get some of the money up front before stuff gets delivered. 479 00:31:51,560 --> 00:31:54,440 » Do we have a date, yet? 480 00:31:54,800 --> 00:31:58,840 » I don't have a final date on when it'll be done. At least not the one that I 481 00:31:58,200 --> 00:32:01,360 know of. >> I I do 482 00:32:00,160 --> 00:32:04,600 We do not yet have a date on it. >> They've just given us kind of 483 00:32:03,560 --> 00:32:06,200 » Come on. >> Roughly? 484 00:32:05,240 --> 00:32:09,880 » Yeah. Well, yeah, it'd be roughly the first of 485 00:32:07,520 --> 00:32:09,880 next year. 486 00:32:10,200 --> 00:32:14,240 » Any on the drainage study? 487 00:32:14,280 --> 00:32:17,800 » You're talking about the >> utility 488 00:32:16,120 --> 00:32:20,880 » utility study? >> Well, we're we were looking at a study 489 00:32:19,360 --> 00:32:22,800 that looked at drainage >> Well, it's all yeah, yeah, all 490 00:32:22,520 --> 00:32:26,240 utilities. >> infrastructure stuff. 491 00:32:24,120 --> 00:32:30,760 » Yeah. Um I don't have an update on it. We do have a proposal from Lockmiller 492 00:32:28,720 --> 00:32:33,520 and it's just a matter of getting the money 493 00:32:31,800 --> 00:32:35,600 and going through CIB process, which I've talked to Mark about. 494 00:32:34,280 --> 00:32:37,840 » Is that something we that 495 00:32:37,080 --> 00:32:39,920 that that where where would money for that 496 00:32:39,200 --> 00:32:43,840 come from? >> Well, we're hoping we can get some of 497 00:32:41,120 --> 00:32:49,400 them from the CIB fund. Uh it's going to It would be about $100,000 just to have 498 00:32:46,000 --> 00:32:53,880 the the utility master plan done. So, if we go to the CIB fund, that's a 499 00:32:51,200 --> 00:32:56,200 50% match. So, we could get 50,000 of it there. 500 00:32:54,960 --> 00:32:59,640 Uh and then we would just have to go find the other 50. 501 00:32:58,120 --> 00:33:03,120 » So, we have to do something for the budget cycle this year? 502 00:33:02,000 --> 00:33:05,640 » Yes. We're going to have to try and add 503 00:33:04,200 --> 00:33:08,200 something into the budget. >> For 504 00:33:06,160 --> 00:33:11,240 » That's right away, right? >> Well, we wouldn't add it for this year. 505 00:33:09,240 --> 00:33:13,040 We'd add it for the first of next >> 2017. 506 00:33:12,000 --> 00:33:15,720 » Unless we can have it still on >> We've already been working working on 507 00:33:14,520 --> 00:33:18,520 next year's budget. >> No, yeah. No, yeah. No, yeah. That I get 508 00:33:18,000 --> 00:33:21,280 that. It's >> I'm not sure when the airport's 509 00:33:20,040 --> 00:33:23,000 » Putting it in for the next one. >> Yeah. 510 00:33:21,920 --> 00:33:26,560 » We're working on budget. >> We'll try to get that 511 00:33:25,280 --> 00:33:29,560 » Okay. So, you think it's about it? That's all the proposals about 100 512 00:33:28,400 --> 00:33:33,120 » About a little bit less, yeah. 513 00:33:30,520 --> 00:33:36,920 » Can Can you kind of put a circle around that? Describe what that is. 514 00:33:35,120 --> 00:33:38,520 » I think it's sending you the scope. >> And cuz they've already given me the 515 00:33:38,040 --> 00:33:44,440 scope. >> And in essence, here's your airport. You 516 00:33:41,400 --> 00:33:46,280 have a whole lot of pipes, wires, water, sewage. 517 00:33:45,680 --> 00:33:49,680 » Good. >> Where is it? Just Just right now, no one 518 00:33:48,160 --> 00:33:53,560 knows where it's at. >> So, this is a 519 00:33:50,880 --> 00:33:56,560 Is this at a level where we where you know all of where all the pipes are? 520 00:33:54,880 --> 00:34:00,000 Here's a proposal or is this just a proposal to find the pipes? 521 00:33:57,920 --> 00:34:02,760 » Well, it's a combination of both. >> You got to do both. You got to find 522 00:34:01,200 --> 00:34:08,200 where the pipes are now so that you can plan ahead for what future growth. 523 00:34:04,680 --> 00:34:12,639 » Do your pipes Do your pipes meet Do they even meet your current demands? 524 00:34:10,280 --> 00:34:15,760 What about future demands? Um 525 00:34:13,919 --> 00:34:20,720 does your uh waste water meet current and future 526 00:34:18,720 --> 00:34:23,080 Can we look at those sizing? I think so. 527 00:34:21,360 --> 00:34:27,120 » Why don't we do this? Why don't we uh make it a future item 528 00:34:24,760 --> 00:34:30,320 uh for next month and you can maybe present that. Scope. 529 00:34:28,679 --> 00:34:32,840 » Yeah, we can present the scope. >> But 530 00:34:30,679 --> 00:34:36,679 » So, so all on the board for what what we're doing. 531 00:34:33,440 --> 00:34:36,679 » Right. Okay. Thank you. 532 00:34:39,000 --> 00:34:44,760 » Uh let's see. 533 00:34:41,720 --> 00:34:44,760 Any other reports? 534 00:34:45,240 --> 00:34:51,560 » I have one minor one. Um I'm wearing a shirt that says Loc 535 00:34:50,040 --> 00:34:55,520 Air, but for the last year we've been Loc Air and Aegis Company. Just so 536 00:34:53,800 --> 00:35:00,320 everyone's aware that if you get an email from me after today, it will come 537 00:34:57,760 --> 00:35:04,600 from jud.hill@aegisgroup.com. So, we're doing our brand transition 538 00:35:02,640 --> 00:35:09,040 over this month. So, when you see stuff coming from 539 00:35:06,560 --> 00:35:14,680 Aegis, it's still us, same exact people doing the same stuff, just all have a 540 00:35:11,320 --> 00:35:14,680 different color shirt. 541 00:35:14,880 --> 00:35:22,800 » Every other year it's like a shirt. Engineers change names and get bought 542 00:35:19,080 --> 00:35:27,640 out more than any other group I know of. >> So, this should be the last one ever cuz 543 00:35:25,640 --> 00:35:29,960 there's no one left that's big enough to buy us. 544 00:35:30,400 --> 00:35:36,600 All right. But, you will see some change. So, if you're on emails or if 545 00:35:33,800 --> 00:35:39,720 you have you're on a list for a meeting, you'll probably get a new invite for 546 00:35:38,120 --> 00:35:44,040 those meetings because the system will change from Loc Air to Aegis. 547 00:35:42,600 --> 00:35:46,760 So, that'll definitely affect our schedule meetings and stuff like that. 548 00:35:45,240 --> 00:35:49,720 » Do we all get shirts now? >> I still want Aegis. 549 00:35:49,880 --> 00:35:53,719 » I will get you a shirt. >> [laughter] 550 00:35:54,200 --> 00:35:58,760 » Okay, uh Steve or or whoever on 551 00:35:57,560 --> 00:36:03,240 » Well, we're doing the SkyWest SkyWest transition. Um 552 00:36:01,120 --> 00:36:08,920 As they start trying to ramp up, there's been some issues with current um Contour 553 00:36:07,240 --> 00:36:13,280 employees that might want to work with SkyWest, but the the training times 554 00:36:10,960 --> 00:36:18,160 aren't matching up. So, it's making it hard for current Contour employees to go 555 00:36:16,520 --> 00:36:22,600 to work for SkyWest. So, I'm trying to work with Cody to see if we can resolve 556 00:36:20,000 --> 00:36:29,320 some of that, but they've started hiring and um are starting the training. So, 557 00:36:25,760 --> 00:36:32,720 that's it's moving forward come come October 1st ready or not that's 558 00:36:31,640 --> 00:36:35,760 what we're It looks like the earliest you can 559 00:36:34,040 --> 00:36:39,880 schedule when I looked at it today was about the 7th. 560 00:36:37,400 --> 00:36:44,920 Well, the 7th would be when Denver when United would start. 561 00:36:42,720 --> 00:36:48,760 United has a longer training period so they just couldn't condense it anymore. 562 00:36:46,640 --> 00:36:52,960 If Salt Lake starts on the 1st Seattle start Salt Lake starts on the 563 00:36:50,160 --> 00:36:59,960 1st Denver starts on the 7th and their IT people have been out there 564 00:36:56,440 --> 00:37:04,440 trying to work out cabinet space and trying to get the [snorts] IT side 565 00:37:01,840 --> 00:37:08,120 of it set up what screens and monitors will be needed for branding. 566 00:37:06,680 --> 00:37:10,880 I still don't know for sure how they're going to handle the branding of the two 567 00:37:09,680 --> 00:37:13,920 separate entities 568 00:37:12,480 --> 00:37:17,200 but they're still trying to work through some of those issues as well. 569 00:37:21,320 --> 00:37:24,920 That's all I've got for you on that one right 570 00:37:23,840 --> 00:37:28,280 now. All right, 571 00:37:26,440 --> 00:37:33,480 I wanted to keep the sign on the the airport we'll call it the we're calling 572 00:37:30,440 --> 00:37:38,080 it the airport monument sign. And the idea here 573 00:37:36,400 --> 00:37:41,320 is just to remind you 574 00:37:39,560 --> 00:37:46,080 we had talked about having a digital sign that doesn't appear to be 575 00:37:44,360 --> 00:37:49,560 a again it's against county ordinances to 576 00:37:48,200 --> 00:37:54,080 do that but 577 00:37:51,480 --> 00:37:57,000 the other the other possibility is what I'll I'll call the