[0:06] you have before you the 2026 mill rate. Um we have a short presentation for [0:12] that. Um just to go over the millage and the calculation of that. [0:20] Just a reminder um the millage rate is a tax levy um for county purposes. It is [0:25] the tax rate per thousand dollar of assessed property value. And you [0:29] determine that by dividing your budgeted tax revenues by your total digest, which [0:34] is the value of the of the county, and subtracting any roll backs. Um the [0:39] taxpayers's bill of rights comes into play there. Um that requires a roll back [0:44] of the millage if there's significant net value from reassessment. [0:49] You have to calculate the value of that reassessment and subtract it from your [0:53] prior year's millage rate. And that applies to all existing real property. [0:58] Um, if you do not roll back to that computed mill rate, you do have to [1:02] advertise a tax increase as a percentage and hold three public hearings. [1:08] Um, just as an example, if you had $100 million um, added from reassessment and [1:15] your digest was $2 billion and your prior year milit rate was 5.283, [1:22] the millet equivalent of that $100 million is.264. [1:27] And so your roll back millage rate would be 5.019. [1:32] If you left your millage rate at 5.283, you would have to advertise a 5.26% tax [1:38] increase. Um, for the actual calculation, um, [1:43] there is $102.6 million added from reassessment [1:48] and your digest is 5.7 billion. Last year's millage rate was 5.051. [1:55] So the millage equivalent of that 102.6 million is 091 mills. Um so your roll [2:03] back millillage for 2026 is 4.96. Um if you had left it at 5.051 you would [2:10] have had to advertise a 1.83% tax increase. [2:16] Um there are several formulas that you use to calculate millage. The gross [2:20] millage is going to be all of your budgeted property tax and your local [2:24] option sales tax divided by that digest and then you have a roll back for the [2:29] local option sales tax which is that local option sales tax amount divided by [2:34] the total digest. The difference in those two is your net millage rate. [2:40] Um just a reminder on local option sales tax you know we have 8 cent here in [2:46] Louns County. of that four cents goes to the state of Georgia. One cent is for [2:52] transportation splast which is for regional um transportation improvement [2:57] projects. You have your splast which is split between the county and the [3:01] municipalities and that's for capital improvements. [3:05] Your education splast which is split between the school systems and that's [3:09] for capital improvements. and then local option sales tax which is split between [3:14] the county and the cities and that is for property tax relief and it has to [3:19] roll back your property tax. So this is a calculation of the M which [3:26] is your maintenance and operation millage um the countywide millage we're [3:30] discussing. Um again the total digest is $5.7 billion. Um your county taxes and [3:38] your local option sales tax. Um your total taxes there are 48.9 or just just [3:44] under $49 million. So that gives you a gross millage of 8.581. [3:51] And then when you calculate that local option sales tax roll back that is 3.621 [3:56] mills which gives you the 4.960 which is the roll back millage. Um at the 96% [4:03] collection rate which is what we typically see in the first year of [4:06] collection. That's about $27.2 2 million. [4:12] Your special district millages, um you have your industrial authority, which is [4:17] a countywide, um that is recommended to remain at 1.1 mil. Your rec recreation [4:23] authority, again, that's countywide at 1.25. [4:28] And fire services, which is in the unincorporated area, that is recommended [4:32] to remain at 2.5. [4:37] as an example for a property tax owner who lived in the unincorporated area. [4:42] This is comparing 2025 with 2026. Um if you had a property valued at [4:49] $200,000, the assessed value of that is 40% which [4:53] is $80,000. You subtract your homestead exemption [4:57] that gives you a net taxable base of $74,000. [5:02] Um, your county tax would go from $373.77 [5:07] to $3674, which is a reduction of $6.73. [5:14] There's no change in the recreation or the industrial. Um, the county school [5:19] system is PL rolling back their millillage, so there's a reduction there [5:24] of about $172 and no change with the unincorporated [5:29] fire. So, your estimated tax on that same property overall is estimated to go [5:35] down about $24 for that same property that's located [5:41] inside the city of Valdasta. You would still see that same decrease of the [5:46] county tax. No change in the recreation or the industrial. Um, the city of [5:51] Valdasta is proposing an increase. Um, so that would go up about $129. [5:58] Um the city schools are rolling back. So that goes down about $19. So overall [6:04] that tax bill would change by about $104. [6:10] If you look at the breakdown, um again, this goes back to the unincorporated. [6:15] For every dollar of taxes that you pay, about 22 cents of that actually comes to [6:21] Louns County. Five cents goes to the parks and recreation authority, five [6:26] cent to the industrial authority, 57 cents to the county school system, and [6:32] 11 cents to the fire department. Um, for every dollar for someone inside [6:38] the city limits of Valdasta, about 17 cents comes to Loun County, 4 cents to [6:44] the recreation authority, 4 cent to the industrial authority, 28 cent to the [6:50] city of Aldasta, and 46 cent to the city school system. [6:56] If you look at the history of the millage rate, the bar that you see is [7:01] the county's millage rate, the countywide millage rate. And you'll see [7:05] at the 4.9 um that is about just about half of what [7:10] it was um back in 2005. It has significantly come down and it has come [7:16] down um every year since 2016. [7:21] Um looking at the property tax and budget history, this puts it in more of [7:26] a chart form. You can see that um from 2018 to 2026, the increase in the digest [7:34] value um of just over $3 billion to 5.7 billion. But you can see that the [7:41] county's um military has gone from 8.814 to 4.960. [7:48] Um and while the budget has increased um over that time period um that next to [7:55] last column there estimated taxes that is the tax revenue that that millillage [8:01] has brought in that has remained almost um the same through that time period. So [8:07] even though the the digest has increased and the budget has increased the amount [8:11] of tax revenue that the county actually takes in has remained relatively the [8:16] same. And this just puts that in a graphical form. Um this is on two [8:22] different scales. So the two lines go with the left hand side that's in [8:26] millions of dollars. Um that is your budget and your property tax. Um the [8:32] area goes to the right side which is in billions of dollars. That shows the [8:36] increase in the digest. And while you see that that dark line at the top, [8:40] which is the budget increasing, the actual property tax revenue line has [8:46] remained relatively flat. And then finally, where does your money [8:52] go? Um, this is just a breakdown of every dollar you spend and how that um [8:57] comes to the county. Nine cent of that goes to the board of commissioners and [9:01] administration. One cent goes to the board of elections. [9:05] two cents to the tax commissioner, three cent to the board of assessors, two [9:10] cents for engineering, 1 cent for contingency, [9:14] um, which are unexpected things that happen. 11 cents goes to all of your [9:18] court services, 36 cents to the sheriff's department, 2 cents for animal [9:23] services, 2 cents for emergency medical services, which is ambulance service. Um [9:29] all other public safety gets four cents, public works 12 cents, industrial 5 [9:35] cents, recreation 7 cent, and all other which is um includes your outside [9:40] agencies gets about 3 cents. Um so with that, if there are no [9:46] questions, again, the countywide millage is before you and that's recommended to [9:50] roll back to 4.96 mills. >> Any questions for Miss Black? [9:56] » Stephanie, thank you for that presentation. Will that be posted on our [9:59] website? Yes, sir. >> Thank you. [10:01] » I I just wanted to say for clarity, uh I guess this reflects no tax increase for [10:05] the county, unincorporated parts of the county. Correct. [10:08] » Correct. >> I want to thank you and staff for [10:10] helping us save dollars in these trying times. [10:14] » Okay. Any other questions? All right. Commissioners, I'll entertain a motion. [10:19] » Motion to approve. >> Motion to approve the 4.960 mill. [10:25] » Yes, sir. >> Okay, we have a motion. Second. [10:28] » We have a second. Any discussion? Hearing none, I'll call the vote. All in [10:32] favor signify by I. >> I. [10:34] » Any opposed like sign? >> Hearing none, the motion carries. Agenda [10:39] item 5B is the adoption of the special district millage for the industrial [10:43] authority. Miss Black, you've already kind of made some uh recognition to [10:47] that, so go ahead. >> Um, yes, sir. Um, prior to 2025, the [10:52] Georgia Department of Revenue required the millillage assigned to authorities [10:55] to be included in that countywide mill, but with the adoption of House Bill 581 [11:01] and um, related legislation, the mill assessed for authority funding is now [11:07] considered a special district and is adopted separately. Um, the proposed [11:12] mill for 2026 for the industrial authority is 1.1 mills, which is no [11:16] change from 2026. Any questions for Mrs. Black? Hearing? [11:22] None. I'll entertain a motion. >> I make the motion to adopt the [11:26] Industrial Authority Mill at 1.1. >> Okay. We have a motion to adopt the [11:31] Industrial Authorities uh special district millage at 1.10. [11:36] Do I have a second? >> Second. [11:37] » I have a second by Miss Evans. Any discussion? [11:41] Hearing none, I'll call the vote. All in favor signify by I. I. [11:44] » Any oppose? Like sign? Hearing? None. Motion carries. [11:49] Agenda item 5C is the adoption of the special district millillage for the [11:53] parks and recreation authority. Miss Black. [11:55] » Um yes sir. Um as the same as the prior one, um this is now a special district [12:00] mill and has to be adopted separately. Um parks and recreation has been set at [12:06] 1.25 mills since it was first implemented and there's no propose [12:09] proposed change in that. >> Any questions for Miss Black? Hearing [12:14] none, I'll entertain a motion. Motion to approve. Okay, [12:18] » we have a motion to approve the special district millage for parks and wreck at [12:21] 1.25. Do I have a second? >> Second. [12:24] » I have a second. Any discussion? Hearing none, I'll call the vote. All in [12:29] favor signify by I. >> Any oppose? Like sign? Hearing? None. [12:33] The motion carries. Agenda item 5D is the adoption of the [12:38] special district millage for fire services. Miss Black. [12:41] » Um yes, sir. Thank you. Um following the board's approval to expand fire services [12:45] in fiscal year 2022, a special district was in um created that includes the [12:51] unincorporated area and that fire um millillage has been set at 2.5 mills um [12:57] since its inception and there's no recommended changes. [13:01] » Okay, any questions for Miss Black? Hearing none, I'll entertain a motion. [13:06] » Mr. Chairman, I move we adopt the special district millage for fire [13:09] services at 2.5. Okay, we have a motion to adopt the special district millage [13:14] for fire services at 2.50. Do I have a second? [13:17] » Second. >> Have a second by Miss Evans. Any [13:19] discussion? >> Hearing none, we'll call the vote. All [13:22] in favor signify by I. >> Any oppose? Like sign? [13:28] Hearing? None. A motion carries. Agenda item 5E is batch one of [13:34] resurfacing group for the transportation improvement act known as TIA. And this [13:38] is the project agreement for that resurfacing. Mr. Mloud. [13:42] » Uh yes, sir. Thank you. The board approved the TIA local delivery [13:46] application for batch one resurfacing project on July 28th, 2026. [13:53] G DOT has approved that application and sent staff the project agreement to be [13:58] approved by the board. Uh staff cannot begin any part of the process to [14:04] construct the project without this agreement. Uh the agreement is eligible [14:10] for the project cost up to 13,134,000. [14:16] Uh this is T2 project and resurfacing 36 county roads. [14:24] » Any questions for Mr. Mloud? >> We have a total of the mileage of all [14:28] these roads. It is fif just a little over 52 miles. [14:32] » Thank you, Chad. >> A lot of new roads, [14:35] » huh? A lot of resurfacing on roads. >> All right. Any other questions? Hearing [14:41] none. I'll entertain a motion. I >> move we approve and authorize you to [14:44] sign those documents. >> Okay. We have a motion to approve and [14:48] occupi occupi authorize the chairman to sign the documents. Yes, sir. [14:52] » Second. >> Any discussion? [14:56] Hearing none, we'll call the vote. All in favor signify by I. [14:59] » I. >> Any oppose? Like sign? Hearing? None. [15:02] The motion carries. Agenda item 5F is the Twin Lakes Road [15:07] Paving and drainage improvements. Again, this is a TIA Transportation Investment [15:13] Act uh project and this is supplemental agreement number one. Mr. Mloud. [15:17] » Uh yes, sir. The original agreement dated 1228 of 2022 with G DOT has a not [15:24] to exceed amount of 2.1 million for Twin Lakes Road. Uh staff has requested the [15:31] TIA office for an additional funding request [15:35] of 1.389 million1,389,400 [15:43] uh to cover the remainder of the project for a total of 3,489,400 [15:54] » and Tia has agreed. >> Tia has agreed. Uh they've sent the [15:59] supplement agreement number one for you to approve. [16:03] » Gotcha. Okay. >> Any questions for Mr. Mloud? [16:06] » That's really just the difference between bidding something and estimating [16:11] something in 2022 versus >> Oh, absolutely. [16:15] » So, it's not that it was >> this is this is the difference in [16:18] estimating 2018 versus 2026. [16:22] » So, there's no scope change or That's correct. Or no. Okay. [16:26] » This has already been started. >> That's correct. [16:29] » When will that road be completed in a rough estimate? [16:32] » 15 months. >> Also in the keep in mind in the in the [16:36] TIA operation, they build in a certain amount of revenue out of that 1 cent for [16:43] inflation issues. Tia one that we've just finished with. Um they they [16:49] basically really was underestimating every or actually overestimating [16:54] everything, underestimating the the revenue. That's the reason why it ended [16:58] a little earlier because the revenue came in. Um, and so really the inflation [17:03] factor wasn't really touched much on Tia one until right at the end. Uh, so [17:08] there's still revenue there for inflation, but yet TIA 2 also they build [17:13] in an inflation factor in there just for this purpose. [17:16] » Makes sense. >> Okay, there's no other questions. I'll [17:21] entertain a motion. Motion to approve the supplemental agreement number one [17:25] and authorize the chairman to sign. >> Okay, we have a motion to approve [17:29] supplemental agreement number one for the Twin Lakes road paving and drainage [17:33] improvements and authorize the chairman to sign the documents. Do I have a [17:37] second? >> Second. [17:39] » Have a second. Any discussion? Hearing none, I'll call the vote. All in [17:43] favor signify by I. I. >> Any oppose? Like sign? Hearing? None. [17:48] The motion carries. Agenda item 5G is the 2026 community development block [17:54] grant disaster recovery funding application and this is in regards to [17:59] any conflict of interest. Mr. Mloud. >> Uh yes sir. Loun County intends to apply [18:04] for the 2026 CDBGDR for improvements to Riverside Road. As [18:10] part of the application, Loun County must comply with federal conflict of [18:15] interest regulations. If an employee, agent, consultant, [18:19] officer or elected official of the state or of a unit of general local [18:24] government, or if any designated public agencies or subreients [18:30] could be affected in any way by CDBGDR funding, a full disclosure must be [18:36] submitted to DCA as part of the application. [18:41] Additionally, the person or persons affected must not participate in project [18:46] discussion, planning, or voting. Uh staff has done some due diligence. We're [18:52] not aware of any conflict of interest related to the proposed application [18:58] target area uh based off of our research. And what we would ask is the [19:04] commission to discuss this as you already have to determine that there is [19:08] no conflict of interest. >> Okay. Any questions for Mr. Mloud? [19:13] Commissioners, uh, unless there is a conflict of interest someone would like [19:17] to bring to everybody's attention at this point, then I would entertain a [19:20] motion. >> Motion to approve. [19:21] » Do we have a motion to approve? Do I have a second? Second. [19:25] » Have a second by Miss Evans. Any discussion? [19:28] Hearing none, I'll call the vote. All in favor signify by I. [19:32] » Any oppose? Like, sign? Hearing? None. The motion carries. Agenda item 5H is [19:39] the 2026 community development block grant disaster recovery. Again, the [19:43] CDBGDR funding application and this is the engineering selection. Mr. Mloud. [19:49] » Uh yes, sir. As part of the same project and the same grant application, Loun [19:54] County has to select a civil engineer through an R RFP process. Staff prepared [20:00] and advertised the RFP. staff received 11 submissions, 10 that met the [20:06] requirements. Uh these scores we provided to you yesterday morning. [20:12] Uh the top three were Level Engineering and Associates, Innovate Engineering, [20:17] and Axis Engineering. All three of those are local firms. Uh they scored in that [20:24] order. And then the cost level was at 12% of construction. Innovate was at 9% [20:31] and Axis provided a lump sum price of $255,000. [20:38] » Okay. Any questions for Mr. Mloud? All right. Hearing none, I'll entertain [20:44] a motion. >> Mr. Chairman, that seeing that the [20:47] estimated construction cost was uh according to Mr. Mloud was around $4 [20:52] million. I see that as being the difference between 9% and 12% being [20:57] roughly $120,000. So my motion would be that we approve [21:02] innovate engineering as the engineer of record for this. [21:06] » Okay. So we have a motion then to approve innovate engineering as the [21:10] engineer. >> Second project. [21:11] » Do I have a second? >> Mr. Marshall, was that a second? [21:15] » Yes. >> Yeah. Okay. So we have a second. [21:17] » All right. Any discussion on the motion? Hearing none. I'll call the vote. All in [21:21] favor signify by I. >> I. [21:23] » Any oppose? Like sign? Hearing? None. The motion carries. [21:29] All right. Agenda item five. I is the 2026 community development block grant [21:34] disaster recovery. Again, the CDBGDR funding application. And this is the [21:39] submittal resolution. Mr. Mloud. >> Uh yes, sir. Again, as part of the same [21:44] uh project and application for Riverside Road, the attached resolution is [21:49] required to be approved by the board before staff can submit the application [21:54] for the grant. The resolution simply states the facts related to the [21:59] application and allows the Southern Georgia Regional Commission to complete [22:03] and submit the final application. >> Okay. Any questions for Mr. Mloud? [22:09] » No, Mr. Chairman, I'd just like to uh personally thank Chad um Paige, [22:14] yourself, and the remainder of the commission, Pastor Morgan, and the [22:17] residents of that area for helping us make this happen uh for them. [22:21] » Yep. >> Thanks. [22:22] » Well, again, we're we're we're praying that it is going to happen because we've [22:25] got to be awarded the the grant, but yes, the process of going through the [22:30] applications, working with the South Georgia Regional Commission to help [22:34] guide us through the the grant process. Again, everybody has really uh done a [22:38] great job and pulled together because this turns out to be a very significant, [22:42] very important road. Uh really didn't really show itself until we had all the [22:47] storms uh in place and because there is a an African-American cemetery on that [22:52] road. As I've said, we we've actually had some incidences where funerals would [22:57] have to be postponed because they just could not get down the road. It was that [23:01] bad. So hopefully this will this is going to eliminate all that and and [23:05] we'll have a good area over there. So >> when when would we we know if we're [23:10] awarded? >> So the grant application if I'm not [23:14] mistaken is due October the 5th. It was September 5th and they moved it to [23:19] October and then typically by the end of the year first of the year we would get [23:24] notice >> of award or not no award. [23:29] » Okay. Any other questions? Hearing none, I'll entertain a motion. [23:32] » Motion to approve. The chairman to sign the resolution. [23:35] » All right, we have a motion to approve and authorize the chairman to sign the [23:39] resolution. Do I have a second? >> Second. [23:40] » Have a second. Any discussion? >> Hearing none, we'll call the vote. All [23:44] in favor signify by I. >> I. [23:47] » Any oppose? Like sign? Hearing? None. The motion carries. Agenda item 5J is a [23:53] data center moratorum on accepting applications for permits. uh yesterday [23:58] morning at the work session you heard from M Miss Dukes. I know she regrets [24:02] she's unable to be here this evening uh because she's just a little under the [24:06] weather. So um commissioners if unless you have any questions in regards to [24:12] that over what we discussed at work session then I will entertain a motion. [24:16] » Mr. Chairman I move that we approve resolution as presented. [24:19] » Okay. We have a motion to approve the resolution as presented and that does [24:23] include a 60-day moratorum on the application uh for permits. [24:29] » So, do we have a second? >> Second. [24:30] » We have a second. Any discussion? >> Hearing none. I'll call the vote. All in [24:35] favor signify by I. I. >> Any oppose like sign? [24:39] » Hearing none. The motion carries. Thank you, commissioners. [24:44] Please. Thank you very much. All right. We'll now move on to agenda item 6A and [24:49] this is the one bid item that we have and this is for the land application [24:54] system known as LA. This is the holding pond sludge removal. Mr. Stalin. [25:00] » Yes, sir. Due to buildup of sludge over several years, the 25 acre holding pond [25:04] at the L needs to have sludge removed. Staff in conjunction with Carter and [25:09] Sloop Engineering advertised for bids to have the sludge removed. Five companies [25:14] submitted bids ranging from $914,240 [25:18] to $6,681,594. [25:23] Tenderwater LLC doing business as Southeastern Environmental Service [25:27] submitted the low bid of $914,240. [25:32] However, after reviewing its exper its experience, [25:37] staff and Carter and Sloop Engineering have determined that it does not have [25:41] the capac the capability in all respects to perform fully and reliably the [25:46] contract requirements. BAM 2 Incorporated submitted the next bid of [25:50] $2,978,848 [25:54] and met the contract requirements of the bid documents. Staff recommends the [25:58] board reject the bid of Tindlewater LLC doing business of Southeastern [26:02] Environmental Services and accept the bid of BAM 2 Incorporated for 2,978,848 [26:11] and authorize the chairman to sign the agreement. [26:14] » Okay. Any questions for Mr. Staly? >> All right. Hearing none, commissioners, [26:19] I'll entertain a motion. [26:24] » Mr. Chairman, I move that we approve BAM 2 incorporated [26:28] uh as the bid um for this project. >> BAM two. [26:32] » BAM two. >> Okay. We have a motion to approve BAM 2 [26:36] uh for the bid on the project. Do we have a second? [26:39] » Second. >> We have a second. Any discussion? [26:42] » Hearing none. I'll call the vote. All in favor signify by I. I. [26:47] » Whoops. Let's show your hands. There we go. Unanimous. Thank you very [26:52] much. All right, we'll now move on. Well, we [26:56] won't move on to the county manager report because Miss Dukes is not with us [26:59] tonight. Uh, but we will move right on into our citizens wishing to be heard at [27:04] this time. Um, let's see. We will start with Miss Teddiana Babcock. [27:12] If you would please come forward and state your name and address for the [27:15] record, please. [27:26] All right. My name is Tatiana Babcock. >> Please. [27:30] And I live at 3561 Ski Range Road. And I wanted to point out we do have a large [27:35] nonpartisan group here tonight. And I want to welcome them as well. So, good [27:38] evening chairman, commissioners, and neighbors. Our county manager, Miss [27:42] Paige Dukes, has spoke about rising cost, housing, rent, and everyday [27:46] pressures on families. That concern is real. A lot of us feel it every month [27:51] when the bills come due. So I ask a simple question. If we are truly worried [27:55] that people cannot afford rent and the cost of living, why would we welcome an [28:00] industry whose entire purpose is to replace the human work with machines. [28:06] These are not ordinary warehouses. These are AI data centers. They exist so [28:10] companies can run artificial intelligence at massive scale. The same [28:15] AI already taking jobs in customer service, bookkeeping, dispatch, legal [28:22] research, insuranceances, logistics, and parts of the healthcare and [28:28] our education. Reports show AI is eliminating thousands of jobs every [28:32] month across the United States and those numbers are accelerating. That is the [28:37] business model. A hyperscale facility does not hire hundreds of local families [28:42] for the long term. Construction jobs, they do come and go, and even those are [28:47] not guaranteed to the locals. After the concrete is poured, you're left with a [28:52] small crew, security, a few technicians, and remote operators who may not even [28:57] live here. The computers inside work 24 hours a day doing work that used to [29:03] require people. Here's the contradiction. We hear concern that [29:07] families cannot keep up with rent and groceries. Yet we are asked to accept a [29:11] project that shrinks the future job market our children will be walking [29:15] into. You cannot say you care about affordability and then help build the [29:20] infrastructure that makes good local jobs disappear. [29:23] And this is where the disconnect becomes impossible to ignore. Leadership in this [29:28] county has grown disconnected from the people who actually live here. When [29:32] residents show up meeting after meeting with real concerns about noise, water, [29:37] power, sink holes, property values, and their children's futures, their [29:42] responses, and often a carefully worded presentation, vague assurances, and the [29:48] message that we just don't understand. Hard questions are treated as uninformed [29:53] or emotional instead of as citizens who know their own land and know their own [29:58] lives. That is not leadership. That is distance. If officials lived the same [30:03] daily pressures, the same rent, the same power bills, the same worry about [30:08] whether their kids have real careers here, they would not treat a hyperscale [30:12] AI data center as just another economic developmental site. They would feel the [30:16] same fear we feel when something this large is pushed towards residential [30:21] neighborhoods with so little transparency and so few permanent local [30:25] jobs. If fewer people have stable work, rent gets harder. Young families leave. [30:31] Kids grow up watching opportunity move somewhere else. Our children will [30:35] inherit three things from the decisions that are made in this room. First, their [30:40] jobs. If we train them for careers that AI is designed to replace. We are [30:44] setting them up to compete with a machine that never sleeps and it never [30:48] asks for a raise. Second, their cost of living. Data centers demand enormous [30:53] power. Residents across the state have already learned that the new loads [30:57] change the whole system. Generation, transmission, long-term rates. Our kids [31:03] will live with those costs for decades, not for one election cycle. And third, [31:07] their home, a hyperscale site next to neighborhoods. It changes the noise, the [31:12] light, traffic, water demand, and the character of the land. In a county with [31:17] sinkholes and carsted, this is not a small risk. Tax money cannot replace a [31:22] job that no longer exists. Tax money cannot buy back quiet neighborhoods. Tax [31:27] money cannot give a teenager a future if the work that built this county has been [31:32] automated away. If the county is serious about people being able to afford rent, [31:36] protect the things that let these people earn a living, such as local jobs, [31:43] stable utilities, safe land, and a community that's worth staying in. Do [31:48] not tell us you're worried about the cost of living while paving the way for [31:52] an industry that treats human labor as the problem that needs to be solved. And [31:58] do not stay so disconnected from the people of Loun County that you can no [32:01] longer hear them when they say clearly and repeatedly, "We do not want this [32:06] next to our homes." Put a real moratorum in place. Finish a strong ordinance [32:12] before any permits. Put our children's future ahead of a speculative AI campus. [32:17] Our kids should not have to pay the price for decisions made without them [32:22] and without us. Thank you. >> Thank you. [32:28] » All right. Our next speaker, Mr. George Fiser. Please come forward and state [32:32] your name and address for the record, please. [32:38] » Good evening. My name is George Fiser. I live at 5278 Hall Road in Hehyra, [32:45] Georgia. Uh, I've been working, as you know, on [32:50] what lies beneath our limestone. We all agree is a carsted limestone. It's got a [32:56] lot of tunnels and caves in it. What I've been doing for the last two or [33:00] three months, I've looked at 22 different images, satellite images [33:07] over our county. I've looked at uh from 1993 [33:14] to December 26th, 2025. We have satellite images. These images are taken [33:22] right above the site. Uh they sort out. We don't have clouds. We don't have [33:28] rain. We can see what is there uh very well. What I've been looking for are [33:35] trying to identify any carsted features on the surface. What can you see on the [33:41] surface? Are they indications of anything below the surface that should [33:46] be a concern? I've also looked closely at existing places that have been [33:52] studied including Shadri Sinkhole, Shiloh Road, Riverchase, Ocean Pond, [33:57] Twin Lake, Snake Nation Road, and Camelot Crossing. I've looked at all of [34:01] those in detail. I can actually make it like a movie. I can get an image up [34:05] there and I can flip back and forth, flip back and forth, change the seasons, [34:09] change the the angles. I can rotate the angles. Um, a lot of the terminology [34:15] that we use is a little confusing because a lot of this work came from uh [34:20] Slovakia and Croatia. So there it's in a Slavic language. So there's kind of hard [34:25] to pronounce. So I'm just going to use simple terms ones here. Um, [34:32] all of my ideas, everything technically that I speak here, I have vetted. I send [34:40] my notes to recognized professors of hydrarology, of geology. I've got a uh [34:46] former fellow I worked with that lives in Perth, that's Australia, is one of [34:50] the premier hydraologists in Southeast Asia. And I get it vetted. I said, "Do [34:56] you see anything in what I'm saying that's incorrect or is not right?" [35:00] Occasionally I get feedback and usually my illustrations are exaggerated. You're [35:05] you've compressed it too much. It's indicating this. So I I change my [35:09] illustrations that I don't show. What I have found is where the data center is [35:15] going to be located off of Coleman Road. I've identified potentially two large [35:21] dissolution features. I've named them Mut and Jeff for the lack of a better [35:26] word. Uh mut is about 500 feet in diameter. Jeff is about 400 feet. They [35:31] are indicated on the 1998 Georgia soils report as wetlands, as a circle, as a [35:39] depression. They're on the crest of the feature, which means they're not bogs. [35:44] The crest of the feature, the water would drain off. A recent aerial view of [35:50] that reveals water in both of these things. A lot of wa water. So my concern [35:56] is that they are in communication from the surface down to the aquifer. The [36:02] overlying rock, the Hawthorne group is very shallow there. In fact, the whole [36:09] the whole county dips down to the east as far as our aquafer and the [36:14] overburden. So it's very very very shallow there. very near the surface. [36:18] These depressions are aligned in a line that's probably due to a compressional [36:24] fra fracture that uh compress pressed this um [36:30] and they are designated wetlands. So, we have to be very careful with the [36:34] wetlands. I've also looked at other features that I mentioned last time here [36:38] to the east of the railroad tracks going down to the river. What I'm looking for [36:43] there are depressions, slope failure, dissolution creasses, [36:49] fluial washouts, and changing string patterns, and even some trees that are [36:53] knocked over there. Um, so that's what I've been doing. And I do [37:02] want to correct a previous statement I made when I'm talking about the aquifer. [37:06] I really want to change that when I speak about the groundwater [37:10] there. I've been talking about the aqua aquafer aquafer but in researching some [37:14] of the hydrarology it's really the groundwater that is my concern you know [37:20] uh we don't want to contaminate the groundwater so [37:25] what I want to ask you to do is to consider in the ordinance putting in a [37:31] very strong geohysical study I talked to a geohysicist yesterday on my road this [37:37] is what we do this is they're out of Tallahassee and out Tampa, this is what [37:41] they do. They they do electrical testing to measure what the ground is like. [37:46] Let's build our house on solid rock and not on shifting sand. [37:52] Thanks, sir. All right. Our next speaker is uh Jen [37:58] Frell. Please come forward and state your name and address for the record, [38:02] please. [38:18] Uh, Jen Frell, 480 Murray Road. I am here to address the conduct of the [38:24] commissioners. Um, thank you for allowing me to speak and let me [38:28] apologize in advance to the people behind me. Public speaking is not my [38:32] thing. On August 11th, in this room, Dr. Retrieva Gear made a comment to the [38:38] commissioners that they in the process of being elected were married to the [38:42] people. Marriage as we all know is only truly successful when built upon a [38:47] foundation of mutual trust. Yet meeting after meeting while we sit in this room. [38:53] Thank you. We are expected to follow and demanded [38:58] to follow rules of decorum while we watch all of you on your phones [39:02] answering calls, sending text messages, whatever it is that you're doing. As [39:08] plainly as I can possibly say it, it's disrespectful. It's giving rules for [39:12] thee, but not for me. Uh there are currently matters of public [39:17] interest that have large portions of the public involved in attending these [39:20] meetings regularly and some that are here for the first time. These matters [39:25] of public interest are discussed even more frequently on social media where [39:29] there are no rules of decorum. Everyone is free to weigh in as they see fit in [39:34] these conversations oftent time become extremely spirited. I am the admin of [39:40] one local Facebook group with over 31,000 members. The vast majority of [39:44] whom are Lowdens County residents, business owners, and taxpayers. Several [39:49] of you seated before me are members of that group. [39:53] I'm here today to place on the public record comments left by Mark Weisenbaker [39:58] in that group. >> We're not going to mention any of the [40:00] commissioner's names. Now, you can you can admonish [40:04] say what you want to say, but we're not going to call out anything. [40:07] » I'll take his name out. That's fine. >> Okay. [40:09] » On the evening of July 28th, someone came into Miss Rachel's internet to tell [40:15] me, and I quote, "There will be another meeting like this one. Get off the [40:20] couch, show up, and see for yourself. Then maybe, just maybe, others will [40:24] notice you probably have a brain or part of one. It puts in question the validity [40:30] of our marriage. These comments have now been spread far [40:34] and wide throughout the community. I brought 50 printout copies that have [40:39] already been given out. You may each have one. We've also turned all of those [40:43] comments into vinyl stickers for anyone in the audience that may want [40:48] them. suggesting people should not be asking [40:51] questions about these meetings unless they are also willing to attend [40:56] ignores your disabled constituents who may not be able to physically attend. It [41:01] ignores your economically challenged constituents who may not have [41:04] transportation to and from these meetings. It ignores your constituents [41:08] who work second shift or long hours. It ignores our local farmers and farm [41:13] workers and a large number of Lowdens County residents who may otherwise want [41:18] to attend these meetings but can't. Which then brings forth the question, [41:22] what happened to the high-priced equipment that was purchased to live [41:25] stream these meetings. This is unacceptable conduct by someone [41:31] uh who we, your constituents, expect a higher level of professionalism and [41:36] integrity from. In closing, I would like to remind the entirety of you that we [41:41] elected you to sit up there. We can remove each and every one of you by [41:47] recall. >> We expect more and we deserve more. [41:53] » Thank you. >> Thank you. [41:56] » All right. Our next speaker is Brida Mink. [42:00] Please come forward and state your name and address for the record, please. [42:18] My name is Britta Mink, 807 Blackwood Road, Valdasta. [42:25] I am disappointed. [42:29] I'm terribly disappointed. Um, I'm glad I followed Jen because [42:37] what she said is um, a lot of what I feel and that is unheard [42:45] completely unheard. Uh, I think a lot of us in this room [42:50] feel unheard. U, we do not want this center. We do not want this data center. [42:58] We want a complete moratorum. We 60 days. That's great. Thank you. I think [43:04] that's wonderful and we appreciate it. We do appreciate the 60 days. [43:10] But we want we do not want it at all. If if for some reason you guys cannot [43:18] understand this, um please hear it now. [43:24] We do not want this. [43:32] Um, there are a lot of reasons it's not going to be in my backyard, [43:41] but I've lived here since I was three. I love this area. I don't want to move [43:48] out. And all of the things that are going to [43:52] happen, they may happen after I die. I'm old. I don't have children. [43:58] My nieces and nephews don't live here. My great nieces and nephews don't live [44:03] here. They never will. So, you could say I don't have a dog in this fight. [44:09] But the people that I love are still here and they're going to be here. [44:16] And the fact that you guys are even considering this, [44:21] that means that you don't love this place. [44:24] And that's upsetting to me. If you can't tell them I'm upset, [44:29] then then you have less of a heart than I thought you did. [44:36] This is going to ruin a lot of people's lives. This is going to take down [44:44] the value of their houses. This is going to ruin [44:51] the land. [44:55] This is going to destroy the a lot of the animals. [45:02] Like I said, I'm an old woman, so I bird watch. Do you know how many birds are [45:08] going to go away and never come back if this place is built? [45:15] We have beautiful birds here, and this is going to make those birds go [45:21] away. Please don't do this. [45:28] Please. This isn't right. This This is This is [45:32] not for us. It's not my backyard, but it's my home. [45:41] It's your home, and you should care more about it. You really should. [45:49] All right. Our next speaker is Charlotte Noel Lundy. [45:54] Rick, please come forward and state your name and address for the record, please. [46:02] » Hi everyone. Uh, my name is Noel Lundy and I am a resident and student at [46:08] Valdasta State University. Um, that's 1500 North Patterson Street. Go Blazers. [46:13] Um, I am here to talk about the proposition to build an AI data center [46:17] in the Foxboro subdivision. Aside from the fact that we as a [46:21] community are saying we do not want a data center here and that the voice and [46:25] opinions of the people should be enough, a data center would damage our community [46:29] in several ways. The sound levels of the methane gas turbines used to power AI [46:35] data centers have been compared to that of jet engines, making it impossible for [46:39] residents and children nearby to sleep at night, which increases rates of [46:43] insomnia. And according to uncalthcare.org, [46:47] lack of sleep increases risks of dementia, depression, and weight gain. [46:51] It's especially damaging to newborn babies and young children as it can have [46:55] lasting effects of damage to their brain development, putting them at increased [47:00] risk for developing issues related to mood regulation and intellectual [47:04] disabilities. A data center would also cause community [47:08] electric bills and water bills to skyrocket, a precedent set by residents [47:12] in other parts of the country who have been so unfortunate to have a data [47:16] center built in their neighborhood. This would affect all kinds of people in our [47:20] town. Everyone like elderly on fixed income, both single and dual inome [47:25] households. And it would only add to the many factors that affect rent [47:29] affordability already. It also has huge impacts on our environment like [47:35] contaminating groundwater, taking away crucial amounts of clean water from [47:39] residents, and the decimation of local bird populations. [47:43] Data centers are not only an attack on lowincome people. The increased use of [47:48] reliance on generative AI is an attack on our humanity and our right to [47:53] sustainable living conditions. We cannot separate ourselves from this land. We [47:58] cannot live without clean air or consistent affordable access to clean [48:02] water. Our future is at stake and a future where the world is a desolate [48:07] wasteland of data centers is no future at all. Please choose the people of [48:11] Valdasta. Thank you. >> Thank you. [48:15] All right. Our next speaker is Mr. Jimmy Lefiles. Please come forward. State your [48:19] name and address for the record, please. [48:26] Jimmy Lefiles, 3561 Riverchase Drive. First of all, thank y'all for giving me [48:33] a chance to talk. I appreciate it. Um, as y'all know, my family are longtime [48:39] Loun County residents and intend to stay that way. I'm an industrial chemist, as [48:44] I've reported already. My research on the chemical side of data centers [48:48] indicates that the proposed 480 megawatt data center will have over 7 million [48:53] pounds of either ethylene glycol or propyline glycol on site and could have [48:59] tens of thousands of pounds of highly toxic PAS chemicals aka forever [49:05] chemicals because they never degrade into safer chemistry. [49:10] These are highly toxic water-soluble chemicals that if released in the [49:14] environment will migrate into the groundwater and into our drinking water [49:18] and we have no way to fix that problem. 50 pounds of PAS pollutes the entire [49:23] Georgia Florida aquifer above the EPA safe drinking water standards of four [49:29] parts per trillion. But I've reported all this already. So [49:34] tonight I want to talk about something else. Every one of these meetings starts [49:37] with an invocation. We ask God to be present in this room and to bless us and [49:42] guide the people that here making these decisions. And I take some solless in [49:46] that because I know the job you guys have is really hard trying to balance [49:50] economic growth to the county and at the same time maintain a high standard of [49:54] living for the people there. On the one hand, the data center could provide a [49:59] lot of tax revenue revenue for the county that could be used for many good [50:03] purposes and some jobs. On the other hand, the data center could generate a [50:07] lot of serious problems. Nearby neighborhoods may be faced with nuisance [50:11] noise, lower property values, flooding from increased storm water runoff, and [50:16] possibly more frequent sink holes. If there are chemical spills, all Loun [50:22] County citizens will be faced with drinking water polluted with even higher [50:26] level of forever chemicals that we have now, which will be there for generations [50:31] to come. And these chemicals are known to cause several kinds of cancer and [50:35] autoimmune dysfunction. All of the problems I just mentioned are [50:40] specific to the proposed Coleman Road site. [50:46] A data center built on a site that didn't have all the all the [50:49] characteristics of the Coleman Road site wouldn't present all these problems. [50:55] The day the Coleman road site is close to nearby neighborhoods in the width of [51:00] Coochie River and combined with that it's on a highly unstable porous car [51:06] geology. I am sure DC blocks the company that [51:11] will build the data center, sell it and then leave town with their money will [51:15] claim to have answers to all these issues. Do I believe that DC blocks can [51:20] design and build a 480 megawatt data center on car limestone within 2500 feet [51:26] of the width of Cuchi River that will run safely for years? No. [51:31] I've got 40 years of experience with with heavy industrial chemical plants, [51:37] designing them, building them, managing them, and I can tell you it's just not [51:41] going to happen. The margin for error is too small. Remember 50 pounds of PAS [51:47] pollutes the whole aquaer. Over time, equipment fails, pipes crack, [51:53] inspections fail, people fail to follow procedures, extreme weather happens, [51:58] budgets get cut. Given the fragile car substrate, the buildings may fail [52:03] structurally as we've already seen with Camelot Crossing. But the difference is [52:08] that data center is going to have millions of pounds of chemicals in it [52:12] when it goes. When is that going to happen? Is that [52:16] going to happen in year three or is it going to happen in year 10? Do you want [52:20] to have to constantly worry about that? Do you want that to be your legacy as a [52:24] commissioner? So, I go back to the invocation. God [52:29] calls on us to love our neighbors as we love ourselves. We can't make the world [52:33] perfect for our neighbors, but we're called to help them whenever we can. [52:37] People in Foxboro and other nearby neighborhoods need a safe, decent place [52:41] to live, and some cannot afford to move. The citizens of Loun County depend on [52:46] the Georgia Florida aqua for water that is safe for drinking and agriculture and [52:50] recreational uses. No amount of tax revenue is worth compromising the basic [52:55] needs of the citizens you're serving. I understand that the path forward is to [52:59] write an ordinance that protects the citizens. To really protect the [53:03] citizens, the ordinance must eliminate the possibility of chemical spills, not [53:07] just to establish what happens after a spill because removing these chemicals [53:12] from our aquifer can't be done. With all due respect, I don't think it's possible [53:17] to write such an ordinance. I'm asking you to please conscientiously [53:22] consider the implications of the current path forward. If you do that, I think [53:27] you'll follow your heart and agree that the Coleman Road site is just too risky [53:31] for the cit citizens of Loun County and maybe start focusing your energies [53:37] on a more appropriate site. Thank you for your service. [53:41] » Thank you. Thank you. [53:45] All right, our next speaker, and I'm sorry I can't read the first name, but [53:50] it looks like Dixon. Sarah Dixon, please come forward and state your name [53:57] and address for the record, please. [54:05] » Hi, my name is Laura Hannah Dixon. I live on 3978 [54:10] Apple Cross Road. Um >> Laura, if you'll stay about 6 to 8 in [54:15] from the microphone, I'll amplify it. It will sound much better. [54:19] » Okay. Can is that good? >> Yeah, that's fine. Okay, thank you. [54:28] Um, a lot of what I have written here has already been stated. Um, but I'm [54:34] going to reiterate it anyway. And if I need to move around for the microphone, [54:38] please let me know. Um, as taxpayers, [54:45] our voices need to be heard. Um, and so many of us have said so many [54:53] times that we don't want a data center here in Valdasta or in any of the [54:59] surrounding areas. There are livestock and animals dying and being still born [55:05] because of data centers and we can see that in in other towns in other places [55:11] where the data centers have been implemented. So we should learn from [55:15] example rather than uh try to make the same mistakes that are causing real [55:22] problems like the livestock dying um like the polluted water. And I know that [55:28] a few weeks ago um we saw a presentation of what might happen to the water uh if [55:39] an ordinance is created uh to take the water somewhere else. And [55:44] I would like to echo what Dr. Tva Gear uh said two weeks ago when she stated um [55:51] even if the water is taken away, where is it going to be taken? uh is it going [55:57] to be dumped somewhere uh else? And you know, someone on this planet is going to [56:03] have to deal with the consequences of the forever chemicals that we can never [56:07] remove out of the water. Um and there are cancer clusters popping up where [56:13] these data centers are. And um it is not wise for us to see these mistakes to see [56:21] the damage from the data centers in area other areas of Georgia and all over the [56:27] United States and to not pause and say we don't want that here [56:33] because we don't want this damage to happen here. Um [56:40] at the very least uh consider the moratorum to be more than two months. Uh [56:48] that is not enough time to really think about making the ordinance stronger. [56:54] It's not enough time to get input from the community. Um [56:59] which we really hope that you will allow input from the community. Um, I spoke [57:06] with a commissioner a couple of months ago and I asked for community [57:11] representation uh to help develop the ordinance and I [57:16] was immediately told no, we are not going to allow uh a citizen to be part [57:21] of the drafting the ordinance because I the commissioner said uh of course we [57:27] wouldn't want a citizen on the committee because y'all are opposed to it. Um, I I [57:34] think that that's ludicrous and uh it's really just of course we would want to [57:39] be on the committee. This is our town. We are the taxpayers and we elected the [57:45] commissioners. So um please uh consider working with us on an [57:51] ordinance and one example and we don't want the data center at all but for [57:55] example something that might be included in a strong robust ordinance that would [58:01] really protect the citizens would be um to not have the data center run on [58:08] fossil fuels because what that would do is create a heat island and make the [58:14] temperature of our area even higher uh than it is. And we're about to we're [58:21] approaching hurricane season. So um we are having hurricanes and weather that [58:27] is not normal for our area. And part of that is because of global warming. So we [58:32] really need strong protections uh environmentally [58:37] um for the water for example uh to protect us from sink holes as others [58:42] have already stated and because of rising temperatures um [58:51] I don't want to believe that we are living in a different Loun County than [58:57] we were in 2010 and 2011 whenever we fought the biomass. Well, actually, I [59:05] was I didn't know that was going on. I was living in Alabama at the time, but I [59:10] was born in Loun County and I've lived here all my life except for a couple of [59:14] years. And um during that time, the community was able to stop the biomass [59:21] uh from happening. And I hope that we still live in All County where the [59:26] commissioners will hear what we have to say with a conscience. [59:30] All [59:34] right, that's the end of our citizens wishing to be heard. Commissioners, any [59:38] questions, comments? I'll entertain a motion to adjurnn. So moved.