[0:32] I will now call to order the July 27th, [0:35] 2026 city of Abling, Kansas City [0:36] Commission meeting. Shayla, may we [0:38] please have a roll call. [0:38] >> Mayor Rin, [0:39] >> here. [0:39] >> Commissioner Taylor here. [0:41] >> Commissioner Kolhoff, present. [0:42] >> Commissioner Lidle, [0:43] >> yes. [0:43] >> Mr. Meisenberg, [0:44] >> here. Roll call's complete. Okay, if we [0:46] please stand for the pledge. [0:50] I pledge algiance to the flag of the [0:52] United States of America and to the [0:55] republic for which it stands nation [0:59] indivisible with liberty and all. [1:08] [clears throat] [1:09] >> All right. And our first item is the [1:11] approval of today's agenda. [1:16] I make a motion we approve as written. [1:19] >> A second. [1:20] >> Motion has been moved and seconded. Do [1:22] we have any commission discussion? [1:26] » Seeing none, we'll roll call vote. Vice [1:27] Mayor Taylor? [1:28] >> Yes. [1:28] >> Commissioner Koloff? [1:30] >> I. [1:30] >> Commissioner Lidle? [1:31] >> Yes. [1:32] >> Commissioner Meisenberg? [1:33] >> Yes. [1:33] >> Myself? Yes. Motion carries. Our next [1:35] item is the consent agenda which [1:38] consists of those multiple items in [1:41] there. [1:43] I'll make a motion we approve as [1:46] written. [1:48] >> I'll second. [1:49] >> Motion has been moved and seconded. Do [1:51] we have any commission discussion? [1:55] » Seeing none with a roll call vote. [1:57] Commissioner Koloff. [2:00] >> I. [2:00] >> Commissioner Lidle? [2:01] >> Yes. [2:02] >> Commissioner Meisenberg? [2:03] >> Yes. [2:03] >> Vice Mayor Taylor? [2:04] >> Yes. [2:04] >> Myself? Yes. Motion carries. Our next [2:07] item under heading six, public comments [2:09] communications is a public forum. If [2:10] there's anyone that would like to [2:11] address the commission on an item not on [2:13] our current agenda, they may do so at [2:14] this time. [2:16] If you could just state your name, [2:18] address, and there is a threeminute time [2:19] limit. [2:23] » Okay. My name is Cindy Peterson. Address [2:25] is 709 Northwest 11th Abene, Kansas. Um [2:30] we are going to put a map for you on the [2:33] property I am looking at. It says, "Good [2:35] afternoon, mayor and commissioners. [2:37] Thank you for the opportunity to speak [2:38] with you. I am requesting consideration [2:40] for the purchase of the cityowned lot at [2:42] 800 North Vine. We currently own the [2:44] property immediately in the front of [2:45] that lot and acquire this parture would [2:49] allow us to improve and maintain the [2:50] property while creating opportunities [2:52] further development. Our plan is to [2:54] clean up the lot by removing the dead [2:56] trees and eliminating the poison ivy [2:57] that continues spread throughout the [2:59] property. We have opport obtained [3:02] estimates and expect these improvements [3:04] to cost approximately 15,000. We are [3:07] prepared to make the investment [3:08] ourselves because we believe property [3:10] has potential and would be an asset to [3:13] the neighborhood and properly [3:14] maintained. Looking ahead, we own the [3:16] property on the north and have discussed [3:18] the possibility of constructing a duplex [3:20] on the combined properties. The current [3:22] lot does not have significant frontage [3:24] in the development in the particular [3:26] manner on its own. By combining the two [3:29] partials, we would have adequate [3:30] frontage and a more functional building [3:33] site. We're still maintaining [3:34] appropriate space around the function [3:36] structure. I would ask the commissioners [3:38] to consider the economics of the [3:40] project. An estimated value of frontage [3:42] was that we own is about $6,200 and we [3:46] anticipate spreading about 15 just to [3:48] clean up the dead trees and the poison [3:49] ivy. That means an investment in the [3:51] property would be about 21,000 before [3:53] any future development takes place. In [3:55] addition, comparable usage lots areas [3:58] have land value on the south side of [4:01] 19,900 [4:02] on the north side and 910 north fine is [4:06] 195. The cleanup cost and loan con [4:08] combined with the current estimate value [4:10] of the property would exceed those [4:11] values before any construction or [4:13] additional improvements are made. Giving [4:15] that significant upfront expense, we [4:17] would re respectfully request [4:19] consideration of a reduced purchase [4:20] price that recognize the current [4:23] condition of the property and [4:24] substantial investment requirements to [4:26] be made it usable. We believe this [4:28] purchase would benefit everyone [4:30] involved. The property would be cleaned [4:31] up, maintained by a private owner rather [4:33] than maintained an unutilized cityowned [4:36] lot. It has also returned the property [4:39] to a tax roles generate property tax [4:41] revenue for the city and other tax taxes [4:44] entitlements. In the future, any [4:46] residential federal in the property [4:48] would further increase its taxable value [4:49] and property additional long-term [4:51] revenue to the community. I thank you [4:53] for your time and consideration and I'd [4:55] be happy to answer any questions. [4:57] >> Thank you, Cindy. And I think uh inter [4:59] city manager, you said you guys have [5:01] already discussed this a little bit. [5:04] >> Yes, sir. City staff discussed the uh [5:06] potential future use by the city of that [5:08] parcel. Uh and we do not anticipate any [5:11] future use. It's landlocked. Uh so [5:14] there's nothing we can do with it. Um, [5:17] what we're looking for is I invited Miss [5:19] Peterson here to make their desire known [5:22] and if it's the uh consensus of the [5:24] commission, then staff will start to uh [5:27] work with her on a possible [5:30] um [clears throat] [5:31] offer and the whole process to sell the [5:34] lot. [5:35] >> Okay. What is the current policy on [5:37] selling city land? Uh [5:39] >> it's any real property transactions [5:41] require commission approval. That's it. [5:46] I'm all for it. [5:47] >> I'm too [5:51] good. [5:51] >> Thank you, Cindy. [5:55] [clears throat] [5:59] » Do we have anyone else uh in the [6:01] audience that would like to address the [6:02] commission on an item not on our current [6:04] agenda? [6:07] Okay, seeing none, we will move to item [6:09] 6B, Abling Public Library 2027 budget [6:12] presentation. Dr. Molton. [6:21] » Hey. Um, I think I'm gonna pull up my [6:23] PowerPoint here. I just have a little I [6:25] didn't know how much information you all [6:27] wanted this year. It's been kind of [6:28] sporadic and different over the years. [6:30] So, um, I'm happy to listen to feedback, [6:32] too, of what all information you want [6:34] for future years from the library. [6:37] Um but I think um the manager Quinday [6:41] included the copy um we sent to him for [6:43] the library budget for 2027. [6:47] And a lot has been involved with the [6:49] library board and the finance committee [6:51] of the library board developing this [6:54] budget. Um but I'm just going to give [6:56] you a brief overview for that. Our [6:59] little mission statement here. Oh, I can change it myself. [7:10] Okay, just for a little mission [7:12] statement there. [7:43] we go. It said on but it wasn't. [7:47] Um there's a little overview about um [7:49] library tax um funds and li other [7:52] library funding. Um and you can see our [7:56] other sources of revenue there listed um [7:58] besides the tax levy. But uh for next [8:01] year our percentage is 89.8% [8:05] will be from tax revenue and 10.2 from [8:08] other funds like our endowment grants [8:10] and um any fees we charge here like for [8:13] copies and printing and faxing and [8:16] things like that. [8:19] A second [8:30] Um, and just uh some brief overviews of [8:32] what it went into putting together this [8:34] budget and changes from last year. Um, [8:37] like we used the same employee benefits [8:39] plan as the city. So the same increase [8:42] applies for our budget. Um, and this [8:45] year to kind of offset that, we decided [8:49] to cut benefits for our part-time [8:51] employees um that we will hire in the [8:53] future. So, we don't have to have that [8:55] budget cushion. Um, and the total for [8:58] the employee benefits is 2.45633 [9:02] of the mills that the 8.22 mills that we [9:04] have. That much is just to cover the [9:06] employee benefits. Um, [9:09] and the budget has a 2% increase for [9:13] staff salaries. And as um, you know, we [9:16] did zero last year with you all. And [9:20] that total amount of money to get the 2% [9:22] is $8,674. [9:26] Um [9:28] the other line items, any increases are [9:31] for maintenance, [9:33] utilities, and then we're really trying [9:36] to u make sure we have all those [9:39] reoccurring expenses calculated [9:41] correctly for software, the phone, [9:43] internet, insurance, and we just got a [9:46] new copier. So, we're still trying to [9:48] figure out what the actual costs of [9:49] that's going to end up being. So, it [9:51] might go up or down. We're not sure yet. [9:52] We've only had it for we've only had one [9:54] bill so far. So, it's hard to calculate [9:56] what we should know more in a few [9:57] months, but just to make sure those are [9:59] all in there. And um pretty much every [10:02] line item is budgeted as like our actual [10:05] expenses that we anticipate. Um [10:09] and besides reducing the employee [10:11] benefits, we um supplemented with $8,000 [10:17] from our endowment fund to keep the mill [10:20] levy at 8.22. and that required [10:23] eliminating um our Hoopla app that [10:25] patrons use for ebooks, audiobooks, [10:28] videos, music, and magazines. Um we'll [10:31] have to cancel that for 2027 um to get [10:34] to the 8.22 ms. [10:45] Wonder if the battery is dying. [10:53] And just a little bit more about the [10:54] budget. In 2025, we our cash balance in [10:58] our general fund was $24,458. [11:01] So that's what we have to carry over [11:03] into 2026. [11:05] Um and we didn't budget any in 2026 to [11:09] increase that at all. So, [11:12] um, and just a little overview of, um, [11:16] some of the budget issues that we're all [11:19] facing. The city faces the same thing [11:21] where if people don't pay pay their [11:23] property taxes, we don't collect that [11:25] money. So, we're anticipating to collect [11:27] that amount, but we don't. Um, and with [11:30] like limited other sources of income, [11:32] it's hard for us to make up that [11:33] difference. So these are the amounts of [11:37] um money we had anticipated for those [11:40] years that we didn't receive um because [11:42] people um didn't were delinquent in [11:44] their taxes. And then um the so it's [11:48] about 4.95% [11:50] just for property tax and if you offset [11:52] it with people who paid their past [11:54] delinquencies brings it down to 3.55%. [11:58] So for 2027, our projected shortfall [12:01] will be between those two numbers. And [12:03] so incorporated into the budget, we got [12:05] it to 17,800, which probably won't be [12:08] quite enough, but that's um what we were [12:10] able to get that number to. So we're [12:13] anticipating um not having that revenue. [12:15] So we budgeted that in this year. [12:23] And just some fun things I uh was [12:26] looking at some stats and for from [12:29] January to June of this year I compared [12:32] to last year and we have library visits [12:35] are up 15.5%. [12:37] So 15.5% more people are coming in here [12:40] than last year. Um circulation of [12:42] physical items is up 6.6% and the [12:46] digital circulation is up 16% over last [12:48] year. And so far this year, we've gotten [12:51] $55,000 in grants. Um, which of course [12:54] we can't spend for like operating [12:55] expenses or utilities, but for other [12:58] special projects that we're able to do [13:00] um since we got that grant money. So, [13:06] and that includes children's literacy. [13:08] Um this year adult literacy projects [13:10] will probably my training will start [13:13] this year but the projects will probably [13:14] start next year for adult um literacy [13:17] and computer literacy for adults. Um we [13:21] I think we all know like the age of AI [13:22] is kind of scary for especially our [13:25] older citizens uh even younger ones to [13:27] determine you know what's real and [13:28] what's not anymore. So, we're hoping to [13:30] focus on some digital digital literacy [13:32] skills next year and um also some [13:38] building projects. [13:40] Um some door automatic door openers for [13:43] our restrooms um because they're not the [13:47] doors are the the bathrooms are really [13:49] nice for um any person in a wheelchair, [13:51] but getting into them is hard cuz the [13:53] doors aren't don't have openers and [13:55] they're really heavy. So, we're hoping [13:57] to add those um with one of our grant [13:58] projects as well. [14:01] And I love my quote from uh President [14:04] Eisenhower. Don't be afraid to go to [14:06] your library and read every book. So, [14:08] take you a long time. [14:11] Um [14:13] and this is just um myself and my [14:16] assistant director, Cara. And those are [14:18] all our library board members currently. [14:20] if you all have any other questions um [14:22] for any of them at any time. [14:25] Like I said, I'm happy to answer [14:26] questions. If I don't know right now, [14:27] I'm happy to find the answer for you. [14:29] And um if you want specific things for [14:32] this kind of presentation in the future [14:34] years, just let me know. I'm happy to [14:36] put whatever information you're looking [14:37] for in there. So, do you have any [14:39] questions? Now, [14:41] >> you did have a reference to an attorney [14:42] general's opinion 2006-4. [14:46] Um that wasn't in our packet. Um, I just [14:49] kind of glanced at it and um, just [14:51] wanted maybe to make everyone else aware [14:53] of that attorney general's opinion, [14:55] specifically our city attorney. If we [14:57] are going to have a discussion later, [14:58] that might be um, that specific attorney [15:01] general opinion was a county um, [15:05] requesting funding, not a city. And, um, [15:07] there are some relevant differences [15:09] between the two. So, I just want to make [15:10] sure that we're aware. And you know, [15:12] frankly, from my perspective, as long as [15:14] you're within the mil levy budget that [15:15] the city has set, you can do whatever [15:17] you want. And so, um, I think if you are [15:20] needing funding beyond that, that's [15:21] where I think you really need to maybe [15:23] communicate early and often, [15:25] >> um, because that would require changing [15:26] that, I believe. I'm not sure about what [15:29] the attorney general thinks, but I think [15:30] we'll have to change that um, ordinance [15:32] if you're going to need funding beyond [15:34] that. [15:34] >> Yeah, like I said, the board got it down [15:37] to the 8.2 by cutting those few things [15:39] for next year. Um, but we'll have to [15:41] look at what that future holds next year [15:43] about what we can do then. So, and if I [15:46] think they're comfortable either way, if [15:49] they really feel like because we've [15:50] considered next steps would be cutting [15:52] hours um and cutting other services and [15:56] programs. So, [15:58] but we made it work for next year. [16:07] » Any further questions for Director Mold? [16:10] No, I appreciate your PowerPoint and [16:13] I've only heard good things about the [16:14] library. So, I say that every time, but [16:16] it's true. So, [16:18] >> well, we left our tables here. We have [16:20] Rodeo Queens coming to read to the kids [16:22] in the morning. So, we were trying to [16:24] get set up a little early. Uh last [16:26] Tuesday, Cinderella, we had about 108 [16:29] people, I think. So, we're expecting a [16:31] We always have a big crowd for the rodeo [16:33] queens. So, um that's what these tables [16:36] are are here for. So [16:39] >> very excited about that. [16:40] >> Yeah, [16:46] » thank you. [16:50] » Might actually work now. [17:04] » Okay, moving on to heading seven, [17:06] unfinished business. First up is 7A, [17:08] consider approval of a Kansas Department [17:09] of Transportation airport grant [17:11] agreement. Interim city manager Quind [17:13] Day. [17:14] >> Thank you. Tonight, uh staff is asking [17:16] the commission to consider approving the [17:19] KOT airport grant agreement so that the [17:22] city can accept the state funding and [17:24] move forward with the T- hanger [17:26] replacement project. As you uh remember, [17:29] the commission has discussed this [17:30] project, the funding strategy, and the [17:32] replacement of the tornado damaged [17:35] hangers for more than a year. Tonight's [17:37] action is simply to approve the grant [17:38] agreement so those funds can become part [17:41] of the overall project financing. Uh [17:44] this grant, as you know, is just one [17:46] piece of the overall funding package. Uh [17:48] the project is funded through three [17:50] primary sources. the uh Federal Aviation [17:53] Administration, the KOT grant that's [17:56] before you, and then the city's required [17:58] local contribution. [17:59] Um the agreement establishes K DOT's [18:03] participation in the project. Under the [18:05] agreement, KOT will reimburse 50% of the [18:07] participating costs up to a maximum of [18:10] $333,700. [18:12] You'll see in your packet that the [18:14] estimate that we're going with is around [18:16] 292,000. [18:17] Um but if those prices increase, we can [18:20] get up to 333. [18:23] The city's responsible for the remaining [18:25] participating cost once KOT's maximum uh [18:27] participation is reached. And we're also [18:30] responsible for any non-participating [18:32] cost. Um there's standard grant [18:34] provisions. They're outlined in article [18:36] two of the agreement. Uh that's on page [18:38] 42 of your packet. [18:41] Uh, and also in your packet is an [18:43] updated funding plan which provides for [18:45] the overall financial picture of the [18:47] project. Current estimated project cost [18:49] is $1.65 million and combines federal, [18:52] state, and local funding over multiple [18:54] funding years. The FAA uh remains the [18:57] largest funding source, approximately [18:59] 940,000. [19:01] ADOT providing funding uh we're [19:04] estimating 292,500 [19:07] but up to 333,000. [19:09] and then the city's local share would be [19:11] uh the $292,000. [19:14] Um [clears throat] the agreement allows [19:17] the city to leverage significant federal [19:18] and state funding to replace that [19:20] infrastructure that was lost in the [19:22] tornado. [19:23] One question that's come up uh in the [19:25] year that I've been here is whether the [19:27] airport will construct six or eight [19:29] hangers. Commission has had a lot of [19:31] discussion the grant application and [19:34] then the agreement addresses that [19:35] directly. The project will be bid with a [19:39] sixth place T-hanger as the base bid, [19:41] eight place T- hanger as the alternate [19:43] bid, but the grant application uh was [19:46] written at the cost for the uh eight [19:48] hangers. So that way um if the engineers [19:53] are close on that cost, then we can do [19:54] the eight hangers if they come in [19:56] significant. [20:00] It is for uh replacing eight of those [20:02] hangers. So, our intent is to construct [20:05] the largest project completed with the [20:07] available funding. Um, that's on the [20:10] application on pages 56 and 63. [20:14] Um, the application also explains that [20:17] replacing the hangers helps the airport [20:19] maintain its minimum number of based [20:21] aircraft needed to preserve future FAA [20:24] entitlement funding. Um, it further [20:26] notes that there's currently 11 aircraft [20:28] on the hanger waiting list, [20:30] demonstrating that demand already exists [20:32] for additional hanger space. Replacing [20:35] the hangers not only restores the [20:36] infrastructure with loss, but also helps [20:38] protect the airport's long-term [20:40] eligibility uh for federal investment in [20:43] the future. So, we recommend that the [20:46] commission approve the grant agreement [20:47] and authorize the mayor and staff to [20:49] execute the related documents so that we [20:52] can accept the grant funding and [20:54] continue moving the project forward. [21:01] Any questions for staff on this one? [21:04] Um, your page numbers aren't lining up [21:06] with the online one here, so I'm having [21:08] trouble finding that, but you said that [21:10] there is no obligation to build an eight [21:13] place hanger with either this or the [21:16] federal grant. [21:18] >> Correct. Uh, the project is being bid [21:21] for six hangers uh and eight place or [21:24] eight hangers as an alternate bid. The [21:26] grant application was written at the uh [21:29] estimated cost for eight hangers. [21:33] And I guess that's exactly what you said [21:34] I think previously that I wanted to [21:36] clarify. So if the estimated cost was [21:38] for eight, that's there's not an [21:39] obligation to build eight. It's just we [21:41] might get less grant funds if we build [21:44] six. [21:44] >> Correct. [21:45] >> Thank you. [21:45] >> Yes. And this um approving this grant [21:49] agreement tonight does not obligate you [21:50] to six or eight. Uh that'll be when the [21:52] bids come in and uh you authorize the [21:55] construction contract. [21:59] » Yeah. Yeah. And that was the only thing [22:00] I had on there to note was I think our [22:02] stated preference is aid if we can make [22:04] it work. [22:06] >> That's how the funding was written in. [22:12] » Any further questions? [22:25] I'll make a motion to consider the [22:28] approval of a Kansas Department of [22:30] Transportation Airport Grant Agreement. [22:33] >> I'll second. [22:34] >> Motion has been moved and seconded. Do [22:35] we have any commission discussion? [22:40] Seeing none, I'm a roll call vote. [22:41] Commissioner Lidle, [22:42] >> yes. [22:42] >> Commissioner Meisenberg, [22:43] >> yes. [22:43] >> Vice Mayor Taylor, [22:44] >> yes. [22:45] >> Commissioner Kolhoff, [22:45] >> hi. [22:46] >> Myself, yes. Motion carries. Our next [22:48] item is 7B. Consider ground lease [22:50] agreement for fairgrounds concessions [22:52] concession buildings. Interim city [22:54] manager Gwendai. [22:55] >> Yeah, this has to do with the U [22:57] concession buildings that are on city [22:59] owned property at the fairgrounds. The [23:01] item tonight was originally uh prepared [23:03] to ask the commission to approve the [23:06] lease agreement that's in your packet as [23:07] to form and set an annual rental amount [23:10] for the buildings. Uh but since that [23:13] agenda was prepared, the owner of the [23:15] two concession buildings that we often [23:16] refer to as the Gaywith buildings, uh [23:18] they're the red ones and in the poor [23:21] shape. Um those have since been sold by [23:24] Mr. Gaywith to uh a family out of [23:27] Chapman and the u the owner of those [23:31] buildings has looked over the lease and [23:33] is acceptable to it depending on what [23:35] the um the annual rental amount is for [23:39] the city. So, if the commission were to [23:42] approve the lease as to form tonight, uh [23:44] we would intend to use this agreement as [23:46] a standard ground lease for the [23:47] remaining concession building owners [23:49] with the exception of the central Kansas [23:52] free that's already covered by them. Uh [23:55] tailoring it only as necessary to [23:56] reflect the applicable building uh [23:58] ownership information [24:01] um which is consistent with the [24:03] recommendation your packet. But what we [24:06] will do is uh if you're comfortable with [24:08] it is ask you to set a lease amount for [24:12] um the two buildings since that owner is [24:14] agreeable to the um lease as as it's [24:17] presented to you and then authorize the [24:20] mayor to uh execute that lease. [24:24] I don't think it has to be done tonight [24:26] if you want to take a look at it. um [24:29] actually might be better if you wait uh [24:31] till the August 10th meeting because [24:33] depending on what you said is the annual [24:35] rent that may change the uh building [24:38] owner's [24:39] um decision. Also, [24:43] uh there is a section in there, section [24:46] 9.4 four in there that requires the [24:49] tenant at their expense to make sure the [24:51] concession buildings are brought into [24:54] compliance with the applicical city [24:55] building codes and to obtain [24:57] certificates of occupancy by June 30th [25:00] of 2027. That gives them a year to bring [25:03] specifically those two buildings uh that [25:05] Mr. Gaywith used to own up to code um [25:09] and that get a certificate of occupancy. [25:12] If by [25:14] uh they don't say they accept the the [25:17] lease as written and uh they don't get [25:20] it done by that date, the lease [25:21] automatically terminates. [25:24] I would personally like to see this on a [25:26] study session. I think there's I'm not [25:28] sure what time frame the free fair's [25:31] range is that it covers the lease of [25:32] that building or whatever it is they're [25:34] paying back to the the free fair, but I [25:36] don't feel like there's any urgency to [25:39] ramrod this through. And I think [25:40] especially without any money, I think a [25:42] lot of those other questions are up in [25:44] the air. So I'd like to do a study [25:45] session and maybe chat with. Seems like [25:47] we have a new owner than we were even [25:49] contemplating 3 months ago or the last [25:51] time this came in front of us. So I'd [25:52] like to get some input from them and [25:54] potentially I don't know if there's [25:56] other building owners. I know the fair [25:58] owns one of those buildings. I think [25:59] maybe there's another private owner as [26:01] well. Is that accurate? Yeah, there's a [26:04] private owner that uh I've asked the [26:06] city attorney to send a letter to [26:07] because she's not responding to our uh [26:09] request to review the lease. Um this [26:14] basically what we're asking for and [26:16] Aaron can weigh in on this is when Mr. [26:18] Gaywith came to the city and said he [26:20] wanted to sell those and wanted our [26:22] permission. We can't find a lease. [26:24] There's not a lease on record at the [26:26] courthouse and none of the people who [26:28] say they own those buildings to provide [26:30] a lease with the city. Um so and Erin [26:34] maybe you can explain if absent a lease [26:36] how that those structures are treated. [26:41] >> Sure. As uh Mr. Quundai mentioned [26:43] there's no evidence that we were able to [26:45] find that the occupancy has been [26:48] formalized or that the structure has [26:51] been severed in terms of ownership from [26:54] the underlying real estate which is [26:56] clearly owned by the city as the record [26:59] owner of the whole fairgrounds. So in [27:01] Kansas, the default rule if if we do [27:04] wish to recognize any form of lease is [27:07] that the law will supply and imply the [27:11] terms of it in the absence of a written [27:13] agreement. And again, that assumes it's [27:15] actually a lease uh in the first place. [27:18] But if if there is a lease and we don't [27:20] have all the material terms, then it's [27:23] deemed a tenency at will and terminable [27:25] at any time by the landlord, which is [27:28] the city upon 30 days advanced written [27:30] notice. So uh the correspondence will [27:33] advise that we wish to formalize in the [27:36] same manner as this lease or whatever it [27:38] is that you all approve and if an agre [27:41] agreement is not reached then we have no [27:43] choice but to treat it as a tenency at [27:45] will and possibly terminate it that [27:48] would be a decision to make as well but [27:50] that is the those are the implied terms [27:53] uh in the absence of a written agreement [27:55] that spells those out [27:58] and I guess for the purposes of a study [28:00] session Uh the lease [28:03] um [28:05] describes the property being lease, the [28:07] permitted uses, the maintenance [28:08] responsibility, utilities, insurance, [28:10] alterations, inspections, default [28:13] provisions, and termination procedures. [28:15] Um I guess for a study session, I don't [28:19] what additional information the [28:20] commission would like us to bring. Uh [28:25] I guess characterizing this as a [28:27] standard lease except for provision 9.4. [28:29] for [28:30] >> I think more than anything I think it [28:32] would be how much can the place support [28:35] lease-wise, moneywise? Um, have they [28:37] been have these properties any of them [28:40] been paying anything over the past prior [28:43] years? [28:44] >> Uh, no. We've had no lease had no leases [28:46] with them. Uh, it's my understanding [28:48] that they pay the fair board $300 to [28:51] operate during the fair. [28:52] >> Okay. But as far as uh a lease amount to [28:56] be on our property, no, there's no [28:58] record of it. And our recommendation [29:01] would be [29:03] something is uh $100 and that would take [29:06] care of, you know, any paperwork that we [29:07] have to do or inspections, things like [29:09] that. [29:10] >> And $100 a month or per year? [29:12] >> Per year. [29:12] >> Okay. [29:13] >> Because I was looking at the insurance [29:14] requirements, too. Do you know if they [29:16] currently have to have that level of [29:18] insurance on it for to operate out of [29:21] the fair board? [29:22] >> No, not what the fair board requirements [29:24] are, I'm not aware of. Okay. And that's [29:26] why we think it's important to have an [29:28] actual lease since it's on the real [29:30] property owned by the city to have those [29:33] things spelled out [29:34] >> within the lease. [29:35] >> I just didn't know what that um a policy [29:38] like that would would cost, you know, [29:40] somebody to operate that over the year. [29:43] Um, so that would be my question is [29:45] whether it'd be financially feasible for [29:48] an operator to pay that level of [29:50] insurance to justify it throughout the [29:53] year. [29:54] >> I thought our previous discussion was [29:56] that they couldn't use it outside of the [29:57] fair anyway. [29:58] >> I mean that's what I meant through the [29:59] fair. I mean to justify it. [30:00] >> I think the discussions we've had [30:02] previously when we've discussed those [30:03] buildings that may have been before your [30:04] time [30:05] >> probably. So [30:05] >> but was that they weren't allowed to use [30:07] those those buildings for [30:08] >> right just three weeks renting them [30:10] something that they can't use. [30:11] >> Yeah. [30:14] I I'm [30:15] >> They do use them uh during the fair [30:17] time. Now, uh Mr. Gaywith, I believe, [30:21] used them. I'm not sure if he did at the [30:23] last fair. And the um what's the last [30:26] name, not Martinez? Lucero [30:29] >> Sora. [30:30] family out of Chapman plans on [30:33] using them during this fair. [30:34] >> Okay. [30:35] >> But that they already have an agreement [30:37] with the fair for those for that period [30:39] of time. I I think it's the same thing [30:41] that any food vendor whether you're [30:43] mobile or in a building would pay [30:47] the two different um items. One, the [30:51] fair charges v food vendors to operate [30:54] uh as part of the fair's revenue. [30:56] Vendors pay that because they think [30:57] they'll make a you know profit [30:58] operating. This is they have buildings [31:02] on city- [snorts] owned property. We [31:04] have nothing that governs, you know, [31:08] those types of things as far as their [31:09] responsibilities, our responsibilities, [31:11] what they can use them for. It's all up [31:13] in the air. So, [31:15] >> my only concern would be is I don't want [31:17] to put anything in place monetarily wise [31:20] that would hinder them from wanting to [31:23] continue operating would be my only [31:25] >> right. Uh the one building and I [31:27] couldn't tell you it's the one closest [31:29] to the carnival is the one they plan on [31:31] using. they do not plan on using the one [31:33] on the other side because they realize [31:35] it needs to be fixed up. So, uh getting [31:38] these this lease in place, uh [31:43] this family will they say they're going [31:45] to fix it up. They've already started [31:46] working on the one and we give them a [31:48] year to bring it up to code. [31:51] I guess my biggest question when I was [31:52] looking through that lease was, you [31:53] know, are there any comparable lease [31:56] amounts from other I know it's kind of a [31:58] unique situation, but [31:59] >> yeah, I mean, we're fine if it's a [32:01] dollar. It's our goal is to get uh the [32:05] basic terms outlined. So the uh building [32:10] owners if if you will know what's [32:12] expected of them for being on city [32:14] property and then city knows what the building tenants or owners are [32:21] responsible for. Right now there's [32:22] nothing. [32:24] Well, knowing that the yearly rate can [32:27] be next to nothing, the only thing that [32:28] I would be concerned about is how much [32:30] they'd have to pay for that insurance [32:32] requirement and whether that would be a [32:35] um hindrance to them or not. If we could [32:37] find that out, then I would be [32:39] definitely just pull the trigger and [32:40] have them sign that lease written as it [32:42] is. [32:43] >> I'm not sure on that amount. Uh but Mrs. [32:47] Goria brought the lease back signed. [32:49] >> Okay. And I told her that [32:52] we need to bring this before you first, [32:54] make sure you're okay with it, and then [32:55] we would ask her to sign it. [32:59] >> I'm okay with Miss Gwith or Mrs. Sora, [33:02] did you say, has signed it already? [33:04] >> Yes, there's actually they put two [33:06] people's name on there, but we require [33:07] that they provide us with a bill of [33:09] sale. Uh, and there's only one name on [33:11] the bill of sale. [33:12] >> Okay. I'd be okay with moving forward [33:14] with the lease if if they're okay with [33:16] the with the terms. Sounds like they are [33:19] based on the fact that they've already [33:21] >> signed it. I don't want to charge them [33:23] any more than we need to then to cover [33:24] the cost of processing the paperwork to [33:28] do the lease. [33:29] >> So, whatever that is on a yearly basis [33:31] for the admin fee, $100 a year. [33:34] >> Yeah. I mean, that just the number we [33:35] picked. It could be anything that you [33:37] want, but like you mentioned, we don't [33:39] want to charge them something for a [33:40] building that they're able to use a [33:42] couple weeks ahead of year. [33:44] >> Same. Yeah. I don't want to stop the use [33:46] of it at all. [33:47] >> Right. And that was my concern. [33:48] >> This would be great to get it [33:50] formalized. Here's your expectations. [33:52] Here's what you can expect from us. And [33:53] oh, by the way, you have to bring it up [33:55] to code or the it goes away. [33:57] >> Okay. Do we have to agree on the amount [33:59] today on the lease or is that something [34:01] that you can negotiate? [34:03] >> Uh that's completely up to you. Uh but I preferable if you would set that [34:07] because then when we get a hold of the [34:10] third building owner, we already have [34:12] that number set. [34:13] >> Okay. [34:14] >> Does that make sense? [34:15] >> Yeah. I don't want to charge the uh [34:17] >> somebody different [34:17] >> story is something different. [34:21] >> Would there be a benefit to waiting [34:22] until after this fair is over? [34:26] >> A benefit uh unless you there's [34:29] something that uh the commission [34:31] analysis study something you want us to [34:34] bring back for you to consider chew on [34:38] whatnot. [clears throat] [34:38] Commissioner Kof, I think he said that [34:41] he would like the potential um [34:45] at lease [34:47] the suras to come to a work study and [34:49] walk through this with you. Um not [34:51] necessarily them, but anybody else. It [34:53] sounds like we're maybe not reaching out [34:55] or we're not finding any of the other [34:57] owners, but if we're going to have [34:58] things that apply universally, I don't [34:59] think one person's signature should [35:01] dictate their neighbor's rent or terms [35:03] for a lease. Well, we've uh reached out [35:07] several times, even twice by uh letter. [35:11] One of them, I believe, was certified, [35:12] but I'll have to confirm that to the [35:14] other property owner, other building [35:17] person who has similar buildings at [35:20] other fairgrounds, and uh she's just [35:25] won't respond. [35:25] >> Not responsive. [35:26] >> Yeah, [35:28] I we've been trying now for several [35:31] months. The last phone call I had with [35:32] her was probably at the beginning of the [35:34] year, maybe at uh it probably at the [35:36] beginning of the year, and her comment, [35:38] if I remember correctly, was, [35:41] "I had a lease. I turned it into the [35:43] city. [35:44] I don't need another one." Well, we [35:47] don't have it. You don't have it. The [35:49] courthouse doesn't have it. We need a [35:51] new one. Just basic, simple, and we [35:54] can't get a response. That's why I asked [35:56] the city attorney to write a letter [35:58] saying, "We'd like you to get a hold of [36:00] us so we can discuss this before we move [36:02] to the next step and ask the [36:03] commission," what do you want us to do? [36:06] >> Well, all four of those buildings serve [36:07] the same purpose and aren't going to [36:09] serve any separate purpose outside of [36:11] their purpose that they're serving now. [36:13] Is that correct? [36:14] >> As I understand it, yes. [36:15] >> Yeah. Then I'd say make it a standard [36:17] dollar a lot lease. [36:19] >> Annual. [36:20] Annual. Would it help to have [36:23] this in place before the fair actually [36:25] gets here so you can hand deliver it to [36:27] that lady that's not getting back with [36:28] us? [36:30] >> I don't know that she's going to have [36:31] one there. Uh [36:33] >> but you know that's a good idea. If the [36:35] commission were to approve the lease as [36:37] a form if she's open we can have [36:40] somebody drop it off to her and say hey [36:42] and have another conversation with her. [36:45] >> I would imagine she'll I would imagine [36:47] she'll be there. [36:48] >> Yeah. I mean I've spoken to her on the [36:49] phone a couple times. long conversations [36:52] that Yeah. reaching out another time [36:54] does hurt. [36:56] >> That's a good idea. When she's there [36:57] working. [36:58] >> Yeah. [36:59] >> You know, if she's not responding, maybe [37:01] that would be one way to get into her. [37:02] So, [37:02] >> yeah. [37:03] >> And as a landlord, you have a standard [37:05] lease regardless of who's [37:08] occupying. [37:09] >> Correct. [37:10] >> So, that's I'm okay with a dollar a year [37:12] standard lease. I'd approve it. [37:15] >> You say one [37:16] >> a dollar a year. Yeah. [37:17] >> Does that cover your paperwork and [37:18] everything that you probably [37:20] >> $1? No, but that's that's okay. [37:21] >> Just errands. [37:22] >> Okay. [laughter] [37:24] >> It covers an hour of errands time. [37:27] >> Pretty cheap lawyer. [37:39] » Or if there's a definite amount, I'm [37:40] open to it. But just keep it cheap. [37:43] >> I would think $100 a year would cover [37:46] anything we have to amend. [37:51] I'll make a motion to consider the [37:52] approval of the ground lease of the [37:54] fairgrounds concession buildings [37:57] at an annual rate of $100 a year. [38:00] >> I'll second. [38:02] >> That would include the uh authorizing [38:04] the mayor to execute those. [38:07] >> Correct. [38:11] » I I'll second again. [38:14] >> Motion has been moved and seconded. Do [38:15] we have any commission discussion? [38:19] Seeing none of the roll call vote. [38:21] Commissioner Meisenberg, [38:22] >> yes. [38:22] >> Vice Mayor Taylor, [38:23] >> yes. [38:24] >> Commissioner Kolhoff, [38:24] >> nay. [38:25] >> Commissioner Lidle, [38:26] >> yes. [38:26] >> Myself, yes. Motion carries. Our next [38:29] item is 7 C. Continue discussion [38:31] regarding the storm water financial [38:32] review and recommendations. Interum city [38:34] manager Quinday. [38:35] >> Yeah. To purpose of tonight's discussion [38:38] is uh not to revisit the KMU storm water [38:40] rate study. Uh the discussion is [38:42] intended to be much narrower. We're [38:44] asking for the commission for direction [38:47] on how you would like to implement the [38:48] revenue requirements uh already [38:50] identified by the KMU study. The report [38:54] uh in your packet evaluates three [38:56] implementation schedules that all reach [38:58] essentially the same long-term rate but [39:00] differ in when the customers experience [39:02] those uh rate increases and when the [39:05] utility receives the resulting revenue. [39:07] What has not changed in the report and [39:10] our presentation is the underlying [39:12] financial analysis. uh KMU with staff's [39:15] assistance evaluated operating cost, [39:17] maintenance, capital improvements, [39:19] reserve requirements, future [39:21] infrastructure replacement, and [39:23] anticipated debt service. Based on that [39:26] analysis, CMU identified the revenue [39:28] needed to keep the storm water utility [39:30] financially stable over the long term. [39:34] The report does not revisit those [39:35] conclusions. Um [39:38] what we're visiting tonight is at a [39:40] previous work study or study session the [39:43] commission asked staff to evaluate [39:45] different ways to implement those rates. [39:47] Uh [39:49] the three that they asked us to uh [39:51] evaluate were the KMU recommendation [39:55] um that minimizes customer impacts [39:57] during the first two years which would [39:59] be a 75 cent increase per drainage unit [40:02] in the first year 8 cents in the second [40:04] year and then it has a significant jump [40:06] in year three when we anticipated [40:09] potential debt service. Uh and we used [40:11] $1 million as that number. Um that [40:16] approach aligns with the increase when [40:19] if the commission were to say go fix [40:21] this drainage issue here, the timing it [40:24] would take for us to uh get it [40:26] engineered, go out for bids and get the [40:29] uh debt service to you would be in three [40:32] years. The other alternative uh spreads [40:35] the increases more evenly over the first [40:37] three years. It'd be uh 76 cents a year. [40:41] we had talked about at study session 75, [40:44] but the math is about 76 cents. So [40:47] instead of one significant adjustment, [40:49] uh customers experience a more gradual [40:51] progression while still uh reaching the [40:54] same long-term rate in year three. And [40:57] the other alternative uh put forth by [40:59] Commissioner Kolhoff was to implement [41:01] the increases immediately. Uh it [41:04] generates additional revenue sooner but [41:06] also results in the largest customer [41:08] increase in the first year. that would [41:10] be taking uh going from our rate now to [41:14] the 354 I believe is what that number [41:17] is. [41:18] So the residential impacts for [41:20] residential customers uh the analysis is [41:23] straightforward. Nearly 99% of our [41:26] customers are assigned one drainage [41:28] unit. That means almost every homeowner [41:30] experiences essentially the same monthly [41:32] increase regardless of where they live. [41:35] Uh the only difference is when that [41:36] accre occurs under each implementation [41:40] schedule. [41:42] Commercial customers are different [41:43] because the businesses with larger [41:46] parking lots and roofs generate more [41:48] runoff and therefore are assigned more [41:50] drainage units. Again, the rate itself [41:53] does not change among the alternatives. [41:55] Only the timing changes. Likewise, all [41:58] three alternatives ultimately generate [42:00] essentially the same annual revenue at [42:01] the end of three years. The difference [42:04] is when the utility receives that. [42:06] Alternate uh two that would be [42:10] um doing it all at once provides the [42:12] strongest early cash flow. Alternate one [42:15] falls in the middle. That's doing it [42:16] over three years. And then the KMU [42:19] recommendation delays the largest [42:21] increase until the projected debt [42:23] service begins. [42:25] Ultimately, this is a policy decision [42:27] rather than a financial one. Uh the [42:29] report concludes that all three [42:30] alternatives achieve essentially the [42:32] same long-term objective. All three [42:34] produce essentially the same revenue and [42:37] the commission's decision is really a [42:39] choice between customer impact and the [42:41] timing of revenue. Staff is not [42:43] recommending one implementation schedule [42:45] over another. What we're asking from the [42:48] commission is to review the analysis, [42:50] discuss the alternatives, and provide [42:51] direction regarding which schedule you [42:54] would like staff to prepare for for [42:56] adoption or for your consideration. [42:59] Should the commission elect to revise [43:01] the schedule uh or choose AMUs, [43:05] alternate one, alternate three, uh we [43:09] would recommend an effective date of [43:10] those rates of January 1, 2027 to [43:13] provide customers adequate notice and [43:15] allow sufficient time for public [43:17] communication and implementation and [43:20] also for those entities that uh budget [43:22] annually to prepare for it. [43:26] Are there any question? [43:39] » Have any thoughts on those three [43:40] options? [43:42] >> A little bit of discussion. [43:43] >> I think we get before we get to the [43:44] money raise option. I've had obviously [43:46] quite a bit of time to think about this [43:48] since our last meeting. I really want a [43:50] concrete plan for fixing the issues that [43:52] we know about, preparing for the ones [43:54] that we don't know about before we raise [43:55] a single penny in taxes or revenue from [43:58] our customers. It's all fine and good. [44:00] We've got 5 years of runway if we don't [44:02] do anything. So, I don't think we need [44:04] to approve this today or next week or [44:05] next month. We need to get a plan for [44:07] fixing the issues that we know about. [44:09] They were brought to a head here. [44:10] There's what, a half a dozen areas that [44:13] get water in their front yards, [44:15] backyards, driveways, basement, [44:18] including our own city building. Um, and [44:21] it's an issue that's been going on as [44:23] long as I've been in town. I've been [44:24] here 17 years, and it's been exactly the [44:26] same. Fourth Street floods, [44:29] uh, summit or whatever it is up [44:31] northwest, there's something northeast, [44:33] there's something in the south. The [44:34] people, uh, actually I had the privilege [44:36] of talking with a gentleman over the [44:37] weekend. They don't even, you're [44:38] correct. They don't actually tell us [44:39] anymore when the southside floods. They [44:41] just expect it. Um, so that's those people aren't coming to meetings. [44:45] They just know that we don't care. And [44:47] so before we come up with a plan to [44:49] raise the money, I think we need to come [44:50] up with a plan to fix it. Then we'll [44:52] know how much money we need and then we [44:53] can raise it appropriately. [44:59] Well, [45:03] I can't speak for the commission, but [45:04] speaking for city staff, I'm not sure I [45:07] would characterize it as we don't care. [45:09] Um, we also do have a plan that was [45:12] approved by the city commission [45:14] identifying the top, I believe, five. [45:17] There's a few more um drainage priority [45:20] areas that you want us to address. [45:23] The first one, of course, is the uh [45:25] South Park, which is anywhere between 16 [45:28] and more than $20 million. Unlikely [45:30] we'll be able to do that without some [45:32] significant federal uh funding grants, [45:35] but there are also others that were [45:37] identified on there. We brought those [45:40] costs to the commission, those [45:42] estimates, and they range between$1 and [45:44] $2 million. And then the young man, I [45:46] always keep on thinking Gary, but uh [45:49] that came and spoke to one of the [45:51] commission meetings and his neighbors. [45:53] We asked uh the engineers to come on [45:55] site when they were already here for [45:56] something else to get twice the bang for [45:59] our buck. Uh they walked that area with [46:03] um public works and came up with a plan [46:07] and a opinion of that construction cost [46:10] which is close to $2 million. [46:12] >> That was the void and the [46:13] >> Hess. Yeah. Okay. Yeah. Uh now that is [46:17] just a okay here's what we can see from [46:20] available information. Um I told the uh [46:26] Olsson folks and the people in that [46:28] neighborhood that we will bring that [46:29] back to the city commission and say okay [46:31] here's what they have. Here's what they [46:33] think it's going to be. But to move [46:35] forward and get a high dollar cost or a [46:37] high cost, they'd actually have to [46:39] engineer it. So we'd, you know, enter [46:41] into an engineering agreement uh with [46:43] them if that's the priority that you [46:45] want. So, I bring that up because we do [46:48] have projects um [46:51] that were identified as being priorities [46:53] by the commission. And even without [46:57] those projects being identified, yes, we [46:59] have $600,000 in there, but um the [47:04] photograph I sent you of the hole over [47:06] here by city hall, uh the estimate for [47:09] that is anywhere between 13 and $28,000 [47:13] to uh repair. Now, that $13,000 is [47:17] repairing what's in the hole. the uh [47:20] 28,000 or $23,000 is to go about almost [47:24] a half a block farther. If that pipe, [47:27] which is that bitrius clay, which is [47:29] cracked, is cracked even further, that [47:31] price will continue to grow and at some [47:34] point it will exceed our capabilities. [47:37] So, [47:38] realistically, um staff would be able to [47:41] use that $600,000 to start fixing those [47:44] issues that we have now. Um, you know, [47:47] in the past, and I'm not an engineer, [47:49] and I'm not speaking to anybody's [47:51] decisions that they made before, but in [47:53] the past to save money, they would wrap [47:56] it in tin uh and pour concrete over and [48:00] hope that it didn't break again. I can't [48:02] find anybody in the uh that part of the [48:07] profession, engineers or other cities [48:10] that say cut out the bad pipe, slide in [48:14] new pipe, put in some couplings, and fix [48:16] the problem. Don't pour concrete over [48:18] it, and hope that it it works. So, u we [48:21] either have to start fixing the drainage [48:23] issues or just pick them down the can [48:26] again. Now, that may sound [48:29] counterintuitive because our [48:30] recommendation is if you implement any [48:33] of these schedules, not to do it [48:34] effective till January 1 of 2027. [48:37] However, whatever implementation [48:40] schedule you choose, if you pick one, uh [48:42] as opposed to doing nothing, then that [48:45] gives us time to plan. Okay, based on [48:47] this implementation schedule, the number [48:49] of meters we have, here's the revenue we [48:52] can anticipate that we can start [48:54] planning on. Can we do these bigger [48:57] projects and we can show granting [48:59] agencies that we have the funding [49:01] mechanism in place uh to apply for [49:04] grants? That makes sense. [49:09] » And that's where I was at too just from [49:11] I mean this uh spring and summer has [49:14] been a good indication or indicator and [49:16] a reminder of how bad it actually is. [49:17] And that's got it in the front of [49:20] everybody's mind. So now is the time to [49:22] invest in this cuz it needs reveal. We [49:25] need action. We need John, I agree with [49:27] you 100%. We need momentum on this. And [49:30] I understand that without a plan or [49:33] purpose set forth before the money is [49:36] in, it's kind of like the snake eating [49:38] its own tail in my opinion on how that [49:41] works. Um, [49:44] I was I I came in today looking for [49:48] alternative two, just like what [49:50] Commissioner Khof mentioned last time on [49:53] let's get the ball rolling on the [49:55] funding and let's get the money in the [49:57] bank faster so we can fix Gary and [49:59] Andy's problem and whatever else we have [50:02] on the list that we prioritized as far [50:05] as the one and $2 million projects. And [50:07] that way, you know, like you said, the bonding and the grant writing, I [50:12] mean, we'll have a idea of now we've got [50:14] this much money to work with as opposed [50:16] to [50:18] um, you know, having that hang in the [50:20] balance as we try to figure out what we [50:22] need and priorities and, you know, we [50:25] got engineering to pay for all up front [50:27] to get an idea of actual hard cost money [50:30] on what these projects are going to [50:32] spend as opposed to just best guess. So, [50:34] we're going to have to start spending [50:35] money for design, engineering, and and [50:38] you know, long before construction. So, [50:41] >> well, so to your point, we already have [50:42] design and engineering from uh prop the [50:45] project up at 15th Street that [50:47] >> Sure. [50:47] >> I don't even know what the the tag was, [50:49] but we decided the price tag was for [50:50] that, but we decided that wasn't [50:51] important. And so, I I want a plan. I'm [50:55] willing to carry out a plan, but I want [50:56] a plan before we come up with the money. [50:58] I mean, it's the same way we did the [50:59] baseball field. Get the plan for the [51:00] baseball field, raise the money. Let's [51:02] get a plan for the water department, [51:04] storm, uh, water, sewer, storm. Let's [51:07] get the plan and then let's go fix it. [51:09] We can raise the money after we have the [51:10] plan. I think we're putting the cart [51:12] before the horse by just saying, "Hey, [51:14] we're taking more and more money." I [51:15] don't know. Uh, I hope that you have. I [51:17] think, um, I'm not the only one who's [51:19] gotten threatening emails from people [51:21] about water and sewer rates. Um, [51:23] ironically, not even in the city. Um, [51:25] but nevertheless, I think that we need [51:28] to be judicious about how we are [51:31] spending other people's money. [51:33] >> 100% are, but we're so far in the hole [51:35] that even this increase isn't going to [51:38] >> well [51:38] >> be effective to cover all that's out [51:40] there that we have now. I mean, this is [51:42] just a small portion of what needs done. [51:45] We know we need to spend it. [51:48] I don't have it right in front of me, [51:49] but I think the five-year projection [51:50] without any of the capital expenditures [51:52] was that we would still have $600,000 [51:55] after five years. So, I I don't disagree [51:57] with you. I I agree we need to do [51:59] something and we need to do a lot of [52:00] things, but I don't think that we need [52:02] to do so much that we don't need to come [52:05] up with a plan for how we do it. And I [52:06] think we're going to rather than playing [52:08] whack-a-ole, which is what it feels like [52:10] we're doing right now. Um whether it's [52:12] southeast, oh that's too expensive, [52:14] we're not going to do that. Northeast, [52:15] oh, we're not going to do that. Who [52:16] knows now? Now, maybe the the west side [52:18] is what's more important. Um, and I I [52:21] don't I don't feel that we've got a good [52:23] plan number one for assessing it or [52:25] fixing it. I don't even feel that we [52:26] know really what the problem is. I can [52:28] tell you I looked over at Gary Boyd's [52:30] place um when it was raining and there's [52:34] three unique water levels if you drive [52:36] up um that's Malberry Street, right? [52:40] There's one in the river by the by the [52:42] park, right? And that's lower than the [52:43] one that's on the right side, which is [52:45] where there's some type of drainage [52:46] structure that arguably the city the [52:48] city is maintaining or owns. And then [52:50] there's Gary Boyd's property, which is [52:52] like 5 ft higher. And so I don't think [52:55] that the problem is I don't think it's a [52:58] million- dollar problem. I don't think [52:59] it's a half a million dollar problem. [53:00] I'm afraid that we're going to spend a [53:02] million dollars fixing something that's [53:03] probably a a5 or $10,000 problem. And I [53:06] don't know if it's I don't know if it's [53:07] tree roots. I don't know what I don't [53:09] know what the situation is. But I can [53:10] tell you that just looking at that [53:12] situation right there tells me that [53:13] there is a there is an issue that [53:16] frankly shouldn't cost $2 million to [53:18] fix. [53:20] >> Oh, may I ask a question? [53:22] >> Yeah. [53:22] >> Uh [53:24] if [53:27] staff says we think this is the issue [53:29] and engineers say we think this is the [53:31] issue and you don't believe it, what are [53:34] you going to believe? I mean how do we I [53:36] guess what's the definition of a plan? [53:39] Um, your current storm water management [53:42] policy requires Brad to come to you with [53:44] a list of drainage area issues. He did [53:48] that. You didn't accept verbatim what he [53:52] suggested. You moved those around and [53:54] said, "These are more priorities." So, [53:56] for me, that's a plan. Uh, [53:59] >> well, I think there's a difference [54:00] between saying $2 million we'll fix this [54:02] and here's what's wrong with what you [54:04] have now. I don't I haven't seen [54:05] anything from those folks other than [54:06] this is the first I've heard about it is [54:08] you telling us about it. So I don't know [54:09] if that's real or not, but I think we [54:12] we've brought it up a dozen times here [54:13] that we think that there's probably [54:15] things in the storm drains and we need [54:17] to go look and we need to see that. [54:19] >> So can I ask another question then? [54:21] You're saying that I'm telling you that [54:22] but you don't know if it's real. Does [54:24] that mean that I'm making it up? [54:26] >> No, I don't think you're making it up. I [54:27] think absolutely if we spend $2 million [54:29] up there, we can fix the problem. [54:31] >> I I 100% believe that. But if the [54:33] engineering firm says this is what we [54:35] think it's going to be, [54:37] then who else do we believe? If they say [54:39] we think it's going to cost this, you [54:41] know, for example, the um CCIP project, [54:45] you know, at one point they thought it [54:46] was going to be $1.8 million, 1.6, but [54:49] they're in the ballpark. Um [54:52] you've got to start somewhere. And right [54:55] now what we have is opinion of probable [54:57] construction costs from an engineering [54:59] firm that's looked at these and there's [55:01] work for the city looking at your [55:02] drainage areas and all of that. So to me [55:05] you have a priority list. The plan is, [55:08] okay, now we've got to be able to pay [55:10] for these. Once you have that mechanism [55:12] in place and you know, okay, based on [55:15] the 3,000 [clears throat] properties, [55:18] whatever that number is, we know we're [55:20] going to go from $60,000 a year revenue [55:22] to $21,000. [55:24] So then we can plan, okay, how much of [55:27] that needs to go towards debt service. [55:29] And if the commission says we can't [55:31] afford south, that's $20 million. We [55:34] want you to do this one. Focus on that [55:37] first. Well, now we know when we go to [55:39] the granting agencies, the state and [55:41] that that okay, we're not bringing in [55:44] 60,000. We're bringing in $200,000. [55:47] We're able to service that as opposed to [55:50] saying, you know, uh, well, we got [55:53] $60,000 and in five years we're going to [55:55] have $600,000 like we do today. It's not [55:58] going to fix anything. [56:00] I haven't [56:02] come across a project yet in the year [56:04] I've been here for uh drainage that has [56:07] been under $600,000. [56:09] I just haven't. Um [56:16] yeah I you know it's you had mentioned [56:19] and maybe I misunderstood the process [56:21] for the uh sports complex but it was my [56:25] understanding that the uh public voted [56:28] for that quality of life sales tax and [56:32] the idea was to put some ball fields out [56:34] there and the city I believe bonded that [56:37] amount. Well, you did because it [56:39] happened right when I got here. $4 [56:41] million for it. But it took several [56:44] months before [56:46] the design was brought to the commission [56:48] to say yes, move forward. [56:50] >> I'd encourage you to look at the history [56:52] of that. I think there's some people [56:54] sitting up here can tell you the amount [56:55] of planning that went into it before [56:57] that ever went up for a vote. [57:00] >> I can just read what the uh the ballot [57:03] question was. quality of life and that [57:05] uh [57:06] >> yeah, there's been a lot of meetings [57:07] that happened before that though and [57:08] many of them in this room that happened [57:09] before we ever got to that point. I [57:11] think Kelly can speak to that as well. [57:12] There were there was a ton of work and [57:15] frankly if that same amount of work was [57:16] done on the storm water study, I would I [57:18] would pass it today. If we had all the [57:20] work that they had done before that had [57:21] gone to a ballot question, I would [57:23] absolutely sign off on this today. [57:25] >> And what kind of work was that? [57:27] >> Kelly, do you want to you want to share? [57:28] I mean, no. I mean, you're telling me [57:30] that the amount of work that they uh [57:32] did. [57:33] >> Yeah. They had a plan for [57:34] >> explain to me what that work is that you [57:36] need me to do for storm water. [57:37] >> I I would you I mean, you're coming up [57:39] here and you're giving us what your [57:41] perspective is. I'm telling you, I was I [57:42] was in the room when we had plans and [57:44] drawings for I think at one point there [57:46] was like eight or 10 ball fields. I [57:48] mean, so there was a lot of work that [57:49] went in before we went to raise money [57:52] from the public before we asked them to [57:53] spend their money on public [57:55] improvements. [57:55] >> Was that who gave you the the drawings? [57:57] I'm just curious now. At this point, I [57:59] don't remember. We've had six different [58:01] people who had their hands in it. Um I [58:03] think it was Mammoth if I was guessing. [58:06] Um I think they were the ones who's kind [58:07] of started the process. [58:08] >> I think they were the first ones. Yeah. [58:10] >> Yeah. So [58:12] I I think it's fine to raise rates. I [58:15] think there's things that need to be [58:16] fixed. I think I would like to see the [58:17] plan first. [58:18] >> And I still don't understand what your [58:20] definition of plan is. [58:21] >> Okay. So was that you said you have an [58:23] opinion of probable cost from [58:26] >> the engineering firm on that project [58:28] >> for the folks that came in last time, [58:30] >> right? [58:31] >> Yes. [58:31] >> And I think we did have that discussion [58:33] at that time. [clears throat] I don't [58:35] believe I can't remember if that was on [58:37] our approved priority list or not. At [58:40] that time [58:41] >> it was not, [58:41] >> but that was one that you're actually [58:43] facing risk of loss [58:46] for the those two homes right there. So, [58:48] it kind of I guess got elevated on that [58:51] list. Is that something you can you can [58:55] send that to us? I don't know how [58:57] detailed it is. [58:58] >> It's a a one sheet based on, you know, [59:01] what they think they're going to need, [59:02] whether it's um 48 inch pipe, RGB. It's [59:06] a little bit technical on the details, [59:08] but it'll tell you what the cost is. Uh [59:10] they also have a I believe a map showing [59:13] where they would build that. Um, and I, [59:17] it's not Gary, but the gentleman that [59:18] came in and started it, uh, the [59:21] engineers agree with him that when a lot [59:23] of that work was done up by Pizza Hut [59:25] and stuff, where that water was going to [59:28] go was not accounted for [59:30] in there. And I've seen um, [59:34] where our guys have tried to secure the [59:36] manhole cover, but it won't hold. It [59:39] blows up in the air because of that. But [59:40] yeah, it's a it's an issue. [59:44] So I guess if you could send us details [59:46] on that specific one. Um because I mean [59:49] even if none of these are really going [59:50] to go into effect until next year [59:51] anyway. So we could review that and [59:54] [clears throat] see if that's something [59:54] that we want to prioritize first since [59:56] there is risk of loss to homes. Um which [59:59] I think warrants [1:00:01] rising rising that prior or rising up [1:00:04] that priority list. Right. [1:00:06] >> Um and [1:00:07] >> we can bring that and the currently [1:00:09] approved priority list to you. Uh, and [1:00:11] if you want to readjust that, we're [1:00:14] supposed to do it annually, but you're [1:00:16] can do it anytime you want. [1:00:18] >> But if we have that opinion of probable [1:00:19] cost and then the mapping on it too to [1:00:21] kind of show what exactly would be [1:00:23] happening and [1:00:25] >> put on the I think that would be put on [1:00:27] the agenda. [1:00:28] >> I think that would be helpful. Yeah, [1:00:29] that would be good to have that list up [1:00:31] in front [1:00:32] >> front and center. That way we can just [1:00:35] look at the amounts y [1:00:36] >> and what we're talking about. That way [1:00:38] we can get an idea about a plan and [1:00:42] what's actually been engineered and what [1:00:44] has a plan behind it and funded on it. [1:00:47] >> None of those on your list have been [1:00:49] engineered, [1:00:50] >> right? And we need money to do that. So, [1:00:51] we got to get started sooner rather than [1:00:54] later on this [1:00:55] >> because we have to have it uh but to get [1:00:59] a uh a grant, you'll have to have a [1:01:02] professional engineering report. Most [1:01:04] granting agencies now require that. It's [1:01:07] not a full design, but they've got to [1:01:09] come out and say, "Okay, we're not just [1:01:12] looking at aerials and and whatnot. [1:01:14] We've been on the ground and here's what [1:01:15] we think it's going to cost." [1:01:17] >> An actual survey and they open actually [1:01:19] open the hood and look at it. Yeah. [1:01:21] >> Once you identify a project before we go [1:01:23] look at granting agencies, we've got to [1:01:24] get them going on that cuz they're [1:01:26] required for most of them, [1:01:27] >> right? [1:01:32] I think that'd be helpful just because [1:01:33] it felt like that one kind of jumped up [1:01:35] the priority list a little bit. [1:01:37] >> And it's not even on the list, too. [1:01:38] >> It's not on the list. It wasn't on It [1:01:40] wasn't on Well, was it? [1:01:42] >> No. [1:01:44] >> I will say if I can real quick, there's been a little bit of property [1:01:48] loss on the fourth of my street area [1:01:50] with flooded cars and stuff like that. [1:01:53] That's been ongoing. So, my opinion that [1:01:55] area, it's all part of the Southeast [1:01:57] drainage project, but I think we need to [1:02:00] look at the new drainage [1:02:03] uh possibilities of more structures and [1:02:06] stuff put in between downtown and Brady [1:02:10] specifically before it had gone out into [1:02:12] that area because that that could be one [1:02:14] whole project by itself. [1:02:16] >> What is the public interest in this [1:02:18] project? I think uh one of the things I [1:02:20] was told with the Northeast 15th Street [1:02:23] project was that that was a private [1:02:24] concern. How does this one on uh Summit [1:02:28] differ from that? [1:02:33] » Yeah, because I don't know where Summit [1:02:35] >> Yeah. So that [1:02:38] was that [1:02:39] >> that's the boy. [1:02:41] >> Yeah. So that was that was more of a [1:02:43] private there was a little bit of a [1:02:44] situation that that was done years ago [1:02:46] before any drainage study requirements [1:02:48] were actually needed or implanted by the [1:02:51] city at that time. So we had a a [1:02:54] facility they got that built and so all [1:02:57] the water water runoff went directly to [1:03:00] neighboring properties without any type [1:03:03] of a drainage control. And so there was [1:03:05] a I'll just say it a little bit of a um [1:03:09] situation between the two adjacent [1:03:11] property owners that really did had [1:03:13] nothing to do with what the city [1:03:15] developed or put in um for the [1:03:18] structures of drainage that were needed [1:03:20] from our side of things at that time. Of [1:03:22] course, this is way before my time, but [1:03:25] um that's the history of the situation [1:03:27] there. That's kind of why we did look [1:03:30] into how we could improve some drainage [1:03:33] up in that air area, but it also um [1:03:37] basically started with um two adjacent [1:03:39] property owners. [1:03:41] That's why that situation kind of got [1:03:43] pushed to the side because I I know um [1:03:46] city attorney Martin got involved in a [1:03:48] little bit of that and and and [1:03:51] why we were making some discussions and [1:03:54] ultimately we kind of decided that the [1:03:57] main complaint wasn't necessarily a city [1:04:00] situation. [1:04:03] >> How many homeowners are affected in this [1:04:05] area? [1:04:07] >> Which which area again? Sorry, the [1:04:09] summit northwest area there. [1:04:13] >> Um, specifically right in the corner [1:04:17] that I know that it cuts through. I [1:04:18] mean, you're probably at least three for [1:04:20] sure. Could be up to five. And I know [1:04:22] part of the plan that you guys haven't [1:04:24] seen yet was some drainage um upsizing. [1:04:26] Generally, uh, they look at 20 to 30% [1:04:30] upsizing of of drainage structures and [1:04:33] tubes um, for replacement to increase [1:04:36] the flow rate. [1:04:39] Uh Mr. Boyd did come to my office here [1:04:41] the other day when the between the two [1:04:43] days we got Abling got the combined [1:04:45] about five inches um about a week ago [1:04:48] and last Thursday and Friday and um said [1:04:51] that the manhole lid did stay on after [1:04:53] we kind of um [clears throat] u [1:04:56] rubberized it down and it stayed in [1:04:58] place and he said that it did flow [1:05:00] through there pretty good on that one. [1:05:01] So maybe it just wasn't the volume on [1:05:03] that particular rain. So, [1:05:07] but I would recommend that if we're if [1:05:09] we're going to look into this more, you [1:05:11] giving Mr. Quinay and myself the [1:05:13] authority to get another probable cost [1:05:15] of um improving fourth and fifth because [1:05:18] that was one originally on part of the [1:05:20] plan. And I personally do believe that [1:05:23] we need more structures to carry that, [1:05:25] but it's going to be a major project. [1:05:28] >> Do we have any kind of ballpark on that [1:05:30] one? [1:05:30] >> No. I think there's an overall cost of [1:05:32] the complete southeast drainage project [1:05:34] structure and I think that's maybe [1:05:37] entailed into that a little bit but to [1:05:40] see the breakdown of what it takes to [1:05:42] get everything over to Brady would be [1:05:44] one thing. Just as a reminder from [1:05:46] everything about 13th Street, I'm [1:05:48] talking east, so east of Buckeye. From [1:05:51] 13th Street um to about the fifth, [1:05:54] fourth and fifth street area, there are [1:05:55] no very limited drainage structures. [1:05:58] Basically, when the town was designed, [1:06:01] it was designed for gravity flow [1:06:03] downhill until it reached the plateau of [1:06:06] flat area of the fourth and fifth street [1:06:08] and then it makes its way on its own. [1:06:09] Um, so helping guide it into structures [1:06:13] um would probably help take away some of [1:06:15] the downflow that all ends up down in [1:06:18] the areas of fourth and fifth. And I was [1:06:20] told that those areas um flooded the [1:06:23] other night again. I don't know if it [1:06:24] was Thursday night um [1:06:27] >> be Friday. Friday night. So, but I know [1:06:29] that there was high water. I'm sitting [1:06:31] down there again because I heard from a [1:06:33] resident um that uh [1:06:35] >> was on Fourth and Fifth Street. [1:06:37] >> Yeah. Around 1:00 a.m. uh couldn't get [1:06:40] to their residence for a little bit. And [1:06:42] it does reach car doors and everything [1:06:44] down in there very easily. And I know it [1:06:46] gets up into yards. Have we had any into [1:06:49] um foundations yet? That that I don't [1:06:51] know. But um I know um it's been awful [1:06:55] close. on that one. Uh the fourth and [1:06:57] fifth street, if we do uh put in more [1:07:00] structures, will that um southeast [1:07:02] drainage project, that tube that's [1:07:05] perhaps undersized and collap [1:07:08] >> it's all going to head to that area. So, [1:07:10] I mean, you you pick your poison on how [1:07:12] much you want to do at a time. [1:07:14] my and maybe I'm wrong, but my initial [1:07:16] thought is start at the river and work [1:07:17] your way backwards because if it's if it [1:07:20] uh you know and of course unfortunately [1:07:22] that's the largest price project, but if [1:07:24] you if you can't get it to flow out at [1:07:26] the highest limits, all you're going to [1:07:27] do is continue to condense it. Can you [1:07:29] carry it away a little bit better with [1:07:32] local drainage? Probably. Yeah. But [1:07:34] ultimately, it's still all got to flow. [1:07:37] >> What's the timing on getting those [1:07:39] opinions of probable cost? [1:07:40] >> I don't know. Jared got that last one to [1:07:42] us within the two week time period or [1:07:44] so. [1:07:47] >> Yeah. [1:07:48] >> Okay. So, I think it'd be helpful. Yeah. [1:07:49] I think it'd be helpful to have both of [1:07:51] those uh just to kind of see and if it's [1:07:54] something that we want I mean you kind [1:07:56] of mentioned just a little bit ago that [1:07:57] you'd like to see some costs on several [1:08:00] of the different projects on what it [1:08:02] would take. Um, I mean, if we're willing [1:08:05] to spend a little bit of money for [1:08:07] investigation purposes without doing a a [1:08:10] full lot of engineering, [1:08:11] >> I think we have to [1:08:12] >> we we can gladly just have them start [1:08:14] working on all of them in my opinion. [1:08:16] So, [1:08:17] >> I think you got to open the hood and [1:08:19] that's where it starts. I think you have [1:08:21] to use a part of what we got in the fund [1:08:24] now, part of the 600,000 and open it up [1:08:26] to engineering to figure out to hatch a [1:08:29] plan. Yeah. We've got to start somewhere [1:08:31] and we've got to open the hood and we're [1:08:33] not qualified to do so. So, an engineer [1:08:36] would have to be the one to do that, [1:08:37] >> right? [1:08:38] >> That'd be the uh the list that's been [1:08:41] identified in addition to [1:08:43] >> with the summit. Yeah. Yeah. And uh like [1:08:47] I said, if you guys are good with that, [1:08:48] um however you want to handle it, but [1:08:50] and giving us permission to go ahead and get all those [1:08:57] uh five slash six areas kind of an area [1:09:00] of probable cost, I guess, at this [1:09:02] point. And [1:09:03] >> timing wise, I mean, we're at the end of [1:09:05] July, so it's not like we're in October, [1:09:07] November already where this would go [1:09:09] into effect in, you know, a month or [1:09:10] two. We've got time still to get those [1:09:14] >> guys. I just think $2 million is [1:09:16] ridiculous. I don't I mean, there's five [1:09:17] homes there. I'm not sure those five [1:09:18] homes are worth $2 million. [1:09:21] >> But you got to open the hood up to see [1:09:23] what it is. And if we get an engineer to [1:09:25] actually do a legitimate study on it and [1:09:28] if it's $2 million after he does it and [1:09:31] looks deeper into it, then that's [1:09:33] something that gets de prioritized. But [1:09:35] we got to have a number on everything [1:09:36] else though. At least a an estimate, [1:09:39] whether it's a $500,000 to $2 million [1:09:42] estimate. At least we have an idea of [1:09:45] how can we start knocking these things [1:09:46] off the list. That's where we start [1:09:48] making the plan is we open the hood, we [1:09:51] have an engineer look at these, get a [1:09:54] cost associated with them, and then [1:09:56] that's how we can prioritize our list. [1:09:58] >> Yeah. My opinion. [1:09:59] >> And I and I just I can see some of the [1:10:01] things that kind of can take place up [1:10:03] there in that area. You know, you got a [1:10:04] lot of backyards, you got a lot of [1:10:06] landscaping, you got a lot of fencing. [1:10:08] If you're if you're excavating and [1:10:10] placing in new, you're going to have [1:10:12] easement costs. You're going to just all [1:10:14] the little things are going to add up. [1:10:15] And and I think I I'd like to keep [1:10:19] reminding that just because we've got a [1:10:20] water line or a sewer line or a storm [1:10:22] water drain that needs replaced, when [1:10:24] they fall within the street area, you're [1:10:26] talking street basically brand new [1:10:28] street replacement costs. And those [1:10:30] costs are extremely expensive right now [1:10:34] um with asphalt prices and everything [1:10:35] else. So you're you're talking about the [1:10:37] whole um part of the plan just to get [1:10:41] something replaced underground that you [1:10:43] don't visibly see. You have to refix the [1:10:45] surface. So I mean some of those costs [1:10:47] can add up there. That's just a reminder [1:10:49] for you. [1:10:51] >> We'll bring back those opinion follow [1:10:52] construction costs [1:10:55] the ones that are identified as [1:10:56] priorities by the commission plus the [1:10:58] summit one uh to you. We have the one on [1:11:03] um the south drainage area. They've [1:11:05] already studied that in depth. So, I [1:11:07] don't think we should ask them to to [1:11:09] redo that. Just the other ones. We can [1:11:11] bring that back to you probably in a [1:11:12] month. Um, we'll ask Jared with Olsson [1:11:16] what he thinks is doable based on their [1:11:18] schedule and timing and then we can [1:11:21] bring that back. There's, like I said, [1:11:23] we're not recommending that whatever you [1:11:25] implement, whether that be KMU's uh [1:11:28] schedule, um the over three years or the [1:11:32] more aggressive all at once, we don't [1:11:34] recommend that take effect till January [1:11:36] so people can plan for it and budget for [1:11:38] it. So, you have some time. Um what we [1:11:42] need to know really for planning [1:11:44] purposes is which one you're looking at. [1:11:48] uh because yeah, they all get there at [1:11:50] the same over a different period of [1:11:52] time. But if you if the commission says, [1:11:54] you know, we're going to do the [1:11:56] alternate two, the one up front, well [1:11:58] then we know starting in 2027, we can [1:12:01] pretty much count on this much rep and [1:12:03] we can start planning with those [1:12:05] numbers. Uh as opposed to over three [1:12:07] years, then we're limited. We have to [1:12:09] start building them. That's what we're [1:12:10] asking for. It's just uh which route you [1:12:14] think you're going to go, which [1:12:15] implementation schedule it's most about. [1:12:18] >> And when you uh talk with Olsson, you [1:12:20] might have them um not completely [1:12:24] revisit the southwest or southeast [1:12:26] drainage project, but see how it affects [1:12:29] the others. Like I know the fourth and [1:12:31] fifth street one, [1:12:31] >> right, [1:12:32] >> is upstream from that. So how they [1:12:35] affect each other and and what their [1:12:37] opinion is on that. [1:12:39] >> We can do that. Is it going to cause [1:12:40] more problems down there if we open it [1:12:42] up? [1:12:42] >> Right. [1:12:43] >> Yeah. [1:12:45] >> Or is it at least get it underground to [1:12:47] where it's not you're [clears throat] [1:12:48] not having as as bad as surface [1:12:50] flooding? I don't know. A little more [1:12:53] capacity if you can at least get it [1:12:55] underground. [1:12:56] >> Do we have a an idea of which [1:12:59] implementation schedule you're looking [1:13:01] at or do you want to wait until you see [1:13:04] all those costs? [1:13:06] >> I think I would wait to see all the [1:13:08] costs. I would I'd like to see have an [1:13:10] idea of what it's going to cost and then [1:13:12] we can have the engineer say this one's [1:13:14] going to be the most effective and then [1:13:16] go from there. [1:13:17] >> Most effective to what though? I mean [1:13:20] for [1:13:20] >> valuewise. [1:13:21] >> Okay. [1:13:22] Impacting the most correct [1:13:24] >> residents. [1:13:25] >> Yeah. [1:13:25] >> Okay. Most impactful to [1:13:27] >> citizens. Absolutely. To the Yeah. To [1:13:30] alleviate [1:13:31] >> Okay. [1:13:31] >> The most amount of potential property [1:13:33] damage. [1:13:34] >> He may be able to get it done sooner, [1:13:35] but we'll probably plan on a month. It [1:13:36] probably be at the end of August, [1:13:38] beginning of September. [1:13:39] >> But we've got plenty of time. [1:13:41] >> Okay. [1:13:41] Thank you very much. [1:13:49] » Okay. Our next item is 7D, discussion [1:13:51] and direction regarding the city manager [1:13:53] search request for proposals. Inter city [1:13:55] manager Quinn Day. [1:13:56] >> Yeah. The purpose of tonight's item is [1:13:58] for the commission to review the [1:13:59] responses received for the RFP for [1:14:02] recruiting a city manager. Um before you [1:14:05] begin your discussion, I did want to [1:14:07] briefly walk through the evaluation [1:14:09] report that was included in your packet. [1:14:11] Uh it was intended to summarize the [1:14:13] evaluation process, explain how the [1:14:15] proposals were reviewed, and provide [1:14:17] information to assist you in determining [1:14:19] how it how you would like to proceed [1:14:21] with the recruitment. Um page one is [1:14:24] just the executive summary provides an [1:14:26] overview of the process, who responded [1:14:28] and the overall evaluation results. Then [1:14:32] we have a background um explains why we [1:14:35] did it and [1:14:37] what was from staff's understanding from [1:14:40] the commission important uh the emphasis [1:14:42] on qualifications recruitment [1:14:44] methodology due diligence and [1:14:46] stakeholder engagement. Then we go into [1:14:48] the responses received. It identifies [1:14:51] the re the firms that submitted [1:14:53] proposals. We did receive eight seven we [1:14:56] considered respon [1:15:01] the league was the non-responsive one [1:15:03] and they did advise they could not [1:15:04] provide the comprehensive recruitment [1:15:06] services requested and instead submitted [1:15:08] a limited recruitment assistance [1:15:10] proposal um because they did not respond [1:15:13] to the requested scope of work. It was [1:15:15] not included in the evaluation. [1:15:17] The report also notes that Austin Peters [1:15:20] Group declined to submit a proposal. [1:15:22] Um, if you turn to page three of the [1:15:27] RFP, you'll find the evaluation criteria [1:15:30] and that was municipal executive [1:15:32] recruitment experience, city manager [1:15:34] recruitment experience, due diligence [1:15:37] methodology, recruitment methodology, [1:15:39] public engagement approach, project team [1:15:42] qualifications and cost. [1:15:44] Then you have the evaluation summary. Uh [1:15:48] from those based on those criteria um [1:15:51] GMP consultants received a score of 96, [1:15:55] Colon Basinger and Associates 94, MGT [1:15:58] 88, Cleur Professionals 87, GPS 85, WBCP [1:16:04] 83, and then Bob Marine Associates 78. [1:16:08] What was not included in the packet was [1:16:10] the cost uh for each proposal that was [1:16:13] put on your desk along with the uh [1:16:15] composite scores. Uh and then the [1:16:18] proposed timing. Uh the schedule [1:16:21] anticipates the commission discussion [1:16:23] that this evening hopefully um [1:16:27] you direct interviews with a short list [1:16:29] of firms uh [1:16:32] by the August 10th meeting or if you [1:16:34] choose just one, we can move forward as [1:16:36] far as [1:16:38] getting a professional service [1:16:39] agreement. So what we're asking the [1:16:41] commission to do is to have a discussion [1:16:44] and u eventually select a recruitment [1:16:47] firm and authorize preparation of the [1:16:49] professional service agreement. One [1:16:51] thing that I did note in what I sent to [1:16:53] the commission um earlier in the week so [1:16:56] you had time to review all of those 498 [1:16:59] pages that came was that uh another [1:17:01] option would be for uh the recruitment [1:17:04] to be handled in house using uh staff [1:17:07] and [1:17:10] got pretty qualified. Yeah. [1:17:14] » Okay. [1:17:16] >> So, that first one, the GMP, [1:17:19] I one of the things that kind of stuck [1:17:21] out to me when looking through theirs [1:17:22] was they're extremely heavy in the [1:17:24] Pacific Northwest and they don't I mean, [1:17:26] I think the furthest east they ventured [1:17:28] is maybe one or two searches in [1:17:31] Colorado. [1:17:33] >> I guess what [1:17:35] do you have any insight into? Does that [1:17:37] really limit us on, [1:17:39] you know, I guess this area or [1:17:42] >> No, because I I believe that most of [1:17:44] them do their um advertising and their [1:17:47] recruitment from the same fishing holes. [1:17:49] Uh whether they're they focus in uh the [1:17:54] Pacific Northwest or the East Coast, a [1:17:56] lot of them will do recruitments in [1:17:58] other areas. Largely, they'll focus in [1:18:01] those areas because they're familiar [1:18:03] with those people in that area. that's [1:18:05] where they're they're housed out of. [1:18:08] But, uh, ideally, if you have somebody [1:18:10] that's from the Midwest, that's [1:18:11] preferable because they're more familiar [1:18:13] with the people that they're going to be [1:18:15] [clears throat] trying to get here. I do [1:18:18] know that, uh, John Deirof did spend [1:18:20] quite a bit of time on the phone calling [1:18:23] people, uh, saying, "Hey, there's an [1:18:25] opportunity for you." [1:18:28] So, he just didn't put ads out in the [1:18:30] paper. He was doing some calling and [1:18:32] trying to get people out. [1:18:34] But no thank [1:18:37] » was that when they were doing the search [1:18:39] or was that here recently? [1:18:41] >> What's that [1:18:41] >> for? When did he make those phone calls? [1:18:44] >> Uh that was during the last search. [1:18:45] >> During the last search. Gotcha. [1:18:48] >> Yeah. I think uh what might have been [1:18:50] missing and what we added to this one [1:18:53] was the uh the vetting and the public [1:18:55] engagement portion. [1:19:01] As far as my ranking, I went through and [1:19:04] read a majority of the 437 page [1:19:08] RFP [1:19:10] responses. Um, Colin Bainger, uh, I had [1:19:14] them as my had that firm as my number [1:19:17] one. They had a great warranty. They [1:19:20] really had a good price guarantee, too. [1:19:23] Uh, good search process. They all had [1:19:25] good search processes and they were all [1:19:27] very good. But what stuck out to me with [1:19:30] them is the fact that they were so [1:19:34] staunch on their reputation and um said [1:19:37] they get it done at at that price [1:19:40] regardless of what it cost them. Um my [1:19:43] second choice would be Clear uh Career [1:19:46] Professionals. Um they're localish [1:19:50] Midwest Oklahoma got a podcast. I think [1:19:53] that's a unique avenue to recruit and [1:19:57] find uh city managers. Um I liked GPS [1:20:01] also. Uh they have a former Kansas guy [1:20:03] on their staff. They placed um Salina [1:20:07] Junction and have done a lot in in [1:20:10] Kansas. Um I steered away from GMP [1:20:15] because they were all Pacific Northwest [1:20:17] for the most part. Same thing with MGT. [1:20:21] um they didn't travel much further east [1:20:24] than Montana. Um and I didn't really see [1:20:27] much in in WBCP or Bob Marie as far as [1:20:32] compatibility with regionality or um [1:20:35] experience in our areas. [1:20:38] So that was my list. [1:20:53] » Yeah. My my I guess when I was going [1:20:55] through them too, my top was that Ben [1:20:58] Colin Benzinger, however you want to [1:20:59] pronounce that. [1:21:00] >> Yeah, that's my one. [1:21:01] >> And then um I think we just had our [1:21:04] second and thirds flipped. I think I had [1:21:05] GPS and then clear career if I remember [1:21:08] correctly. I didn't. I should have [1:21:10] numbered them on here. [1:21:12] [snorts] [1:21:25] » Did you say in-house is a possibility? [1:21:27] Is that what you said? And what would [1:21:30] that look like? like we just have our [1:21:32] staff find us a city manager. [1:21:38] » Okay. Yeah. I mean I kind of like that [1:21:40] idea that [1:21:43] >> you still have cost associated with that [1:21:47] checks. [1:21:48] >> Okay. [1:21:50] on [1:21:52] city negotiations, [1:21:55] which I believe you did the last. [1:22:00] What do you think a timeline on that [1:22:02] would be? Would that be something that [1:22:03] we can give that a shot internally and [1:22:06] um save $30,000 [1:22:08] and put a timeline on it? And if that [1:22:11] doesn't turn up any good candidates then [1:22:15] we can revisit with interviewing um you [1:22:20] know using this existing [1:22:22] results [1:22:24] and interviewing the three companies. I [1:22:26] don't know the job. [1:22:33] » I don't know that we'd be able to give [1:22:34] you, hey, we're doing great on [1:22:36] recruiting folks because we'd have to [1:22:38] come up with the same thing that the um [1:22:40] these firms would be. What are your [1:22:41] priorities uh as a manager? Maybe they [1:22:44] haven't changed a lot. What do you [1:22:46] what's the salary going to be? What are [1:22:48] the educational requirements? Is there a [1:22:50] residency requirement? Package that up, [1:22:52] send it out, and then how long do we [1:22:54] give them? Then we give them 30 days to [1:22:56] respond. Uh, and then we said, "Hey, [1:22:59] we're not getting anything. I'm not sure [1:23:01] these bids would still be good." [1:23:02] >> Yeah. [1:23:04] That's what I was asking. That's [1:23:05] what I was curious on. [1:23:09] >> Yeah. And I kind of I kind of like [1:23:11] having a third party involved just to I [1:23:14] mean, [clears throat] you had mentioned [1:23:15] there's a warranty aspect to it as well. [1:23:18] Um, and I think they have the I mean [1:23:20] they have the real world experience of vetting these candidates and really [1:23:24] digging into them. [1:23:25] >> Yeah. [1:23:26] >> Not saying staff couldn't do that, but [1:23:28] they I mean they do this dayto day [1:23:30] >> and the network to find them, [1:23:32] >> right? [1:23:32] >> That's huge. [1:23:33] >> I think it would open up our pool a [1:23:36] little bit, but it's kind of like [1:23:38] publishing things in the or putting [1:23:39] notifications in the newspaper. It's a [1:23:41] third party record. And kind of the same [1:23:43] thing here. you get a third party to [1:23:44] kind of I guess weed through a lot of [1:23:46] that for you. [1:23:47] >> Well, and they probably keep track of, [1:23:49] you know, who's getting close to or [1:23:51] getting ready to move [1:23:53] [snorts and clears throat] on or [1:23:54] >> things like that. So, [1:23:55] >> yeah, [1:23:56] >> who to go after, [1:23:57] >> right? Yeah, they have a lot of inner knowledge as far as the that [1:24:04] world, especially u you know, uh GPS. I [1:24:08] mean, they deal almost strictly with [1:24:10] city officials. So, [1:24:12] >> yeah. I think you mentioned that that [1:24:14] one of them was former city manager [1:24:15] camp, [1:24:16] >> right? Yep. Yep. [1:24:17] >> And I believe they're both attorneys [1:24:19] now, [1:24:20] >> Commissioner Taylor. Um I think I had [1:24:23] WBCP a little bit higher. Were they on [1:24:25] Did they make your list? [1:24:26] >> They did not. [1:24:27] >> Okay. [1:24:27] >> I did not have ABCP on on mine. I had um [1:24:31] Banezinger one and you could probably [1:24:35] put clear career and GPS type for two. [1:24:38] That was kind of where I was sitting. I [1:24:40] think WB CP was my fourth. [1:24:51] And I think honestly I think the only [1:24:53] reason they were my fourth was just [1:24:54] because it was a lot of add-ons. [1:24:57] Um which could be beneficial if we're [1:24:58] not needing all of them. It could lower [1:25:00] their cost a little bit [1:25:02] >> unless we end up needing them all. [1:25:04] >> It's kind of like 50/50 on additional [1:25:06] expenses and they were [1:25:08] >> kind of the low [1:25:09] >> Yeah. low cost out of the gate and it [1:25:11] seems like they're very qualified. I [1:25:13] don't think there's any question about [1:25:15] competency. I was just kind of curious [1:25:16] if you had a [1:25:17] >> right [1:25:18] >> reason why they didn't rank higher. [1:25:23] » I think no, nothing really stuck out. I [1:25:27] was I was looking for a lot of regional [1:25:30] um experience just because I want them [1:25:32] to know [1:25:34] um I don't know, I guess who we are, I [1:25:37] guess. So, I was looking for that. [1:25:38] That's why I eliminated a couple of [1:25:40] those West Coast firms [1:25:43] and that's why I bumped up um [1:25:47] Clear and GPS so high because I know GMP [1:25:50] looked fantastic too, but them just [1:25:52] being on the West Coast, I mean that's [1:25:54] just my internal rankings. [1:25:57] >> Yeah, [1:25:58] it's no fault of them and it knocked [1:26:00] them down a few pigs for me too. [1:26:02] >> Yeah. [1:26:02] No, it's a great firm. just [1:26:06] I feel like having local knowledge is [1:26:08] important. [1:26:09] >> You think I mean I guess doing a Zoom [1:26:12] interview with four of them is that [1:26:15] excessive. [1:26:17] >> I think three would be like I don't [1:26:20] know. I'd like to do fewer if possible. [1:26:24] >> Going to say this. I'd have to agree [1:26:25] with Commissioner Kohhoff. Three would [1:26:26] be the fewer the possible. [1:26:28] >> Mhm. [1:26:33] » [clears throat] [1:26:37] » I did just pull up their list. They've [1:26:38] got a bunch of states. WBCP has a bunch [1:26:40] of states, but it's six people outside [1:26:43] of the state of California. [laughter] [1:26:45] There's like one person in Idaho, one [1:26:47] person. [1:26:48] >> That's Yeah, that's probably why they [1:26:50] didn't make mine. [1:26:56] It seemed like Benzinger was definitely [1:26:59] one that we'd want to consider. [1:27:01] >> Yeah, for sure. [1:27:04] >> Would you want to do the interviews [1:27:05] during the August 10th meeting or [1:27:07] schedule a special meeting so that focus [1:27:09] just on that and they're not back to [1:27:11] back. For example, if you're [1:27:13] interviewing all say three, you schedule [1:27:16] 30 minutes for each same regular [1:27:18] meeting. It's a regular meeting. Well, I [1:27:21] guess any meeting, but uh they could [1:27:23] listen into your interviews. [1:27:26] >> You can't interview them in executive [1:27:27] session. [1:27:30] >> Uh no, because they would not be [1:27:32] employee personnel that we're hiring. [1:27:34] They're independent contractors. So, it [1:27:35] would need to occur in an open public [1:27:37] setting. And the rule is if any portion [1:27:40] of our meeting is televised, the [1:27:42] entirety of that meeting needs to be [1:27:44] televised. If you wish to have a special [1:27:47] meeting for this purpose so as to [1:27:49] preclude interviewed candidates from [1:27:51] seeing the responses from those who go [1:27:54] before them, you could do that with the [1:27:55] plan of not televising any portion of [1:27:57] that meeting. [1:27:58] >> We could do a study session also. [1:28:01] >> Yeah. [1:28:02] >> Yes. If it it would be a separate [1:28:04] meeting uh apart from any other [1:28:08] regular meeting that's televised. Yes, [1:28:11] you could call it a study session. Mhm. [1:28:12] Well, I guess I'm saying our study [1:28:14] sessions aren't televised if I I guess I [1:28:15] don't know why we wouldn't necessarily [1:28:16] want this to be televised unless there's [1:28:18] something that they don't want to be [1:28:19] televised. I guess um I'm not sure if [1:28:22] that's the case. [1:28:23] >> I don't think they'd have a problem with [1:28:24] it. Just if the other people were [1:28:26] watching, so if I'm WCBP and I'm third [1:28:30] to be interviewed, I might want to watch [1:28:31] the other two. And [1:28:33] >> I think that's all fair. [1:28:35] >> Yeah, [1:28:38] I'd go Bayinger for sure. Um, and then I [1:28:43] don't Deb Amy, what are your thoughts on [1:28:46] two and three? I, like I said, I'm clear [1:28:49] career and GPS. Those are my [1:28:51] >> That's where I was at. [1:28:52] >> I'm good with those, too. [1:28:53] >> Okay. Do you want to set up interviews [1:28:55] for those three? [1:29:00] » I'd be fine with that. [1:29:02] >> Yes, please. [1:29:02] >> Sounds good. [1:29:03] >> Special special meeting or during the [1:29:05] August 10th meeting? Let's do [1:29:08] I I don't [1:29:09] >> I'm no preference [1:29:11] >> was kind of having trouble. It just hit [1:29:13] me that they're going to go like one [1:29:14] bang bang bang, right? So having that [1:29:15] televised like [1:29:16] >> arguably the third one might have some [1:29:18] benefit. [1:29:20] >> So I think from that perspective I think [1:29:22] >> study sessions the way to go [1:29:24] >> off camera. [1:29:24] >> Yeah. Or you just have it under August [1:29:26] 10th study session. [1:29:27] >> That's what we were alluding to and that [1:29:29] not to say that's right or wrong but [1:29:30] that's a consideration uh for you if [1:29:33] you're going consecutive interviews. [1:29:35] they noticed we were favoring this [1:29:37] aspect over a different one, they could [1:29:38] kind of tailor theirs real quick to [1:29:41] >> Yeah, I think that is going to give us [1:29:43] better information too. [1:29:44] >> Study session then [1:29:46] >> August 10th. [1:29:47] >> Yeah, let's do it. [1:29:48] >> Um, [1:29:50] do you want to just be a free interview, [1:29:52] have them introduce themselves and their [1:29:54] philosophy and then you can ask [1:29:55] questions based on that or do you want [1:29:57] to have set questions? [1:30:00] >> We'd want to have it to be interactive. [1:30:02] >> Yeah. Are we assuming they're all going [1:30:04] to be on Zoom or are we planning for in [1:30:06] person or Zoom? [1:30:08] >> I would guess Zoom. [1:30:09] too. Yeah, [1:30:11] >> I think we would just I think we should [1:30:12] just set it up as Zoom and not give them [1:30:13] the option that way. [1:30:14] >> Yeah, they'll be in the room. [1:30:16] >> The travel costs aren't associated with [1:30:17] it. [1:30:18] >> Yeah. [1:30:19] >> And then just have just tell them that [1:30:20] uh you'd like to interview them and they [1:30:23] can start by introducing themselves and [1:30:24] >> Yeah. [1:30:25] >> Uh then you guys can ask questions. How [1:30:28] long [1:30:29] >> would they anticipate? [1:30:31] Uh, I would think I mean 30 minutes [1:30:33] >> 30 minutes [1:30:34] >> piece we could leave [1:30:34] >> that would be good [1:30:36] >> 20 minute interview with a 10-minute gap [1:30:40] >> between [1:30:42] definitely want to leave a little gap [1:30:43] just to [1:30:44] >> Yeah, I would think that' be fine. [1:30:46] >> Do you want to see what they I mean is [1:30:47] there a [1:30:48] >> Yeah. Do they have to remember what we [1:30:50] did on there [1:30:51] >> industry standard pitch time? I guess [1:30:53] they have [1:30:54] >> sure. I don't last time with you guys uh [1:30:58] the last recruitment you just selected [1:31:00] uh [1:31:00] >> yeah we didn't interview [1:31:02] >> I just didn't know if there was a [1:31:08] » hey 30 minutes apart [1:31:09] >> we 30 minutes with 10 minutes in between [1:31:12] so that way if you guys want to discuss [1:31:13] something if you're done discussing it [1:31:15] we can pick up the phone and say are you [1:31:16] ready and dial them in [1:31:18] >> yeah I think so [1:31:19] >> just ask them to be ready in this window [1:31:22] right Okay. [1:31:24] >> And just to be clear, uh, Basinger, [1:31:27] Clear, Clear, and GPN, [1:31:29] >> correct? [1:31:30] >> Thank you. [1:31:38] » Is this going to be at the study session [1:31:40] after the regular meeting on August? [1:31:42] >> Yes. Make that agenda light. [1:31:44] >> Okay. Because we'll have to we won't [1:31:46] have a definite start time depending on [1:31:48] how long the agenda is either to give [1:31:49] them either if it's after a meeting. [1:31:51] >> Yeah. [1:31:53] I mean technically if they if we had to [1:31:56] if something came up they could adjourn [1:31:59] uh or recess the uh regular meeting and [1:32:02] then come back if they had to. [1:32:04] >> Okay, [1:32:06] >> that was a good thought too, Shannon. [1:32:08] Hadn't thought of that. So [1:32:11] >> um next item under heading eight new [1:32:14] business is 8A. Consider scheduling a [1:32:16] joint meeting with the Abene Public [1:32:17] Library Board. Yeah, this is just to [1:32:19] gauge whether or not the city commission [1:32:21] would like to schedule a joint meeting [1:32:23] with the libraries board to discuss [1:32:25] issues that have been discussed recently [1:32:27] between city staff uh library staff and [1:32:31] the library board. The uh beginning on [1:32:34] pages 98.99 of your packet, we summarize [1:32:37] the recent correspondence between city [1:32:39] staff and the library board regarding [1:32:41] the interpretation of the 2011 lease [1:32:44] agreement, the statutory budget process [1:32:46] for the library, uh the ordinance which [1:32:48] establishes the maximum levy and the [1:32:51] respective responsibilities of city [1:32:53] commission. Um [1:32:56] you may ask well why a joint meeting? [1:32:58] Well, the lease agreement specifically [1:33:00] recognizes that issues concerning the [1:33:03] application of the agreement uh may [1:33:05] arise and provides that unresolved [1:33:07] issues may be addressed through a joint [1:33:09] meeting of both boards. Uh the intent of [1:33:12] the meeting would to bring everybody [1:33:14] together at the same table so both [1:33:16] governing bodies uh have the same [1:33:18] information, can ask each other [1:33:20] questions and develop a common [1:33:21] understanding moving forward. Um, the [1:33:24] recommendation for a joint meeting [1:33:27] between the two governing bodies should [1:33:29] not be viewed as suggesting that either [1:33:31] party is right or wrong. Rather, it [1:33:34] flect city staff's belief that matters [1:33:36] involving shared governance are best [1:33:38] resolved through open discussion among [1:33:39] all parties rather than continued [1:33:41] written correspondence back and forth. [1:33:44] Um, proposed topics which they can be [1:33:46] anything that you and the library board [1:33:48] uh choose, but staff would recommend [1:33:51] reviewing the lease agreement. [1:33:53] clarifying the respective [1:33:54] responsibilities of the city and the [1:33:56] library under the lease. Reviewing the [1:33:59] statutory budget process applicable to [1:34:01] the library fund. Uh reviewing the [1:34:04] ordinance establishing the maximum levy [1:34:06] and then develop a shared understanding [1:34:08] of these matters moving forward. for the [1:34:10] governing body's supposed to understand [1:34:12] and then uh Wendy and I and other staff [1:34:16] Cara and Carrie I mean case we all have [1:34:19] a shared understanding [1:34:22] and since that's 15year-old agreement [1:34:24] it's I think it's good that it's [1:34:26] revisited and the boards get together [1:34:28] and decide how you want that to look. [1:34:30] Um, [1:34:32] so our recommendation is if the uh [1:34:35] library board, I believe they're still [1:34:36] all here, uh, would like to is for us to [1:34:39] schedule a joint meeting, uh, at a [1:34:42] mutually agreeable date, time, and [1:34:44] agenda and then, um, we'll develop an [1:34:48] agenda focus on those topics. [1:34:51] Any that's something you'd be interested [1:34:53] in doing? [1:34:55] Yeah, that would be would you like to be [1:34:57] a regular study session or a special uh [1:35:00] meeting focus just on that? [1:35:03] >> What uh I'm curious what the library [1:35:05] board might have in mind. Would you want [1:35:07] to do that as part of a regular meeting, [1:35:10] regular study session? I'm open to [1:35:13] whatever works for you guys. Yeah, if we [1:35:14] do a regular study session, we'd have [1:35:18] to wait until the 24th of August [1:35:22] because this that next the 10th would be [1:35:25] pretty much eaten up with the [1:35:26] >> the interviews [1:35:27] >> interviews. Is there I mean is there a [1:35:30] time? [1:35:31] >> No, there's no hurry that [1:35:32] >> I was going to say there's nothing to [1:35:34] [clears throat] [1:35:36] I would say a study session on the 24th [1:35:39] if you guys are [1:35:42] open. Does that work? [1:35:45] works for me. My schedule study session [1:35:47] on the 24th. [1:35:49] >> Does that work for you guys? [1:35:51] >> Yep. [1:35:52] >> Yeah. [1:35:53] >> Uh does the agenda topics [1:35:57] are they okay with everybody? Something [1:35:59] we need to add? [1:36:03] I envision that I would ask the city [1:36:05] attorney to review the lease agreement. [1:36:09] Then we would discuss the statutory [1:36:11] budget process. [1:36:14] Then uh discuss the uh maximum levy. [1:36:17] Then we open it up to just a discussion [1:36:21] between the two boards. [1:36:23] >> Staff will sit back and [1:36:25] >> does that cover everything that the [1:36:26] library wanted to discuss. [1:36:31] » Thank you. Can always amend our agenda [1:36:33] on the day of if something pops up. [1:36:34] >> That works for me. In a study session, [1:36:37] it'll be a lot of back and forth and [1:36:40] might bring up new topics anyways. Yeah. [1:36:44] >> 11. So there's [1:36:49] » Yeah. [1:37:00] » Sounds like a plan. [1:37:01] >> Yeah. Yeah. Thanks. [1:37:02] >> And we're going to interview people or [1:37:04] you will and then on the uh 24th meet [1:37:07] with the library board. Yeah. [1:37:08] >> Yep. And then in September, we'll bring [1:37:10] you some opinions of problem [1:37:11] construction costs for I believe it's [1:37:14] seven identified plus [1:37:18] >> summit. [1:37:18] Thank you. [1:37:19] >> Yeah, 17th. [1:37:21] >> Northwest 17th. [1:37:22] >> 17th and [1:37:24] >> yeah, thank you. [1:37:25] >> I can only think of Gary. That's [1:37:28] >> it is Gary Void. [1:37:29] >> Yep. [1:37:34] Okay. Do we have anything to add with [1:37:36] the department reports that were [1:37:37] included in the backup? [1:37:39] >> I did. I forgot. So, no. [1:37:40] >> Okay. [1:37:42] We have nothing further. I'd [1:37:43] consider a motion to adjurnn. [1:37:46] >> Motion to adjurnn. [1:37:48] >> Second. [1:37:49] >> Motion has been moved and seconded. Do [1:37:51] we have any commission discussion? [1:37:54] >> Seeing none, we'll do a roll call vote. [1:37:55] Vice Mayor Taylor. [1:37:56] >> Yes. [1:37:56] >> Commissioner Koloff. [1:37:57] >> Hi. [1:37:58] >> Commissioner Lidle. [1:37:59] >> Yes. [1:37:59] >> Commissioner Meisenberg? [1:38:00] >> Yes. myself.