[0:07] Evening and thank you for coming out on [0:10] a really miserable evening. My name is Dean [0:14] Charter I'm vice chair of the select board [0:16] and I'm chairman of the public works building [0:19] committee. This will actually be a this is [0:24] a posted meeting of the public works building [0:26] committee. We have a quorum of our members [0:30] here present at the table. I'll have them [0:33] introduce themselves in a moment. And we'll do [0:38] the presentation, question and answers. And then certainly [0:42] everybody's welcome to stay around as long as [0:44] you want with lots of questions we hope [0:46] there are and at the end of that [0:50] we'll just be having a brief committee meeting [0:52] just to set up future agendas and to [0:56] accept some minutes from our last meeting which [0:59] was way back in March. So let me [1:05] just do a brief self introduction as you [1:09] know who I am and other committee members. [1:14] We will start with Tom if you just [1:15] want to introduce yourself. Hi everybody I'm Tom [1:19] Beach and I'm the assistant town manager. Mike [1:22] Harris public member. Adam Noldy a member of [1:26] the Finance Committee and Land Stewardship Committee for [1:29] the town of Acton. Corey York the DPW [1:32] Director. Okay thank you. Let me before I [1:42] introduce the town manager, let me just give [1:45] you a little brief background of my own [1:49] interest in this project which might clarify my [1:54] passion for getting this thing done. I spent [2:01] time in the present building from 1972 until [2:05] 2015. Neither all or part of my day [2:09] was spent in that building, and I pretty [2:11] much know every inch of it inside and [2:14] out. There were a couple of issues which [2:17] we'll be discussing in more detail but I'll [2:22] give you my own personal experiences that I've [2:24] had with it in the years that I [2:25] was there. Air quality issues were terrible in [2:30] the building. Constant infiltration of diesel fumes and [2:35] everything else coming from the work areas and [2:38] into the office areas. And frankly, the ventilation [2:42] for the folks in the workshop was awful [2:44] as well. One amusing thing happened years ago [2:48] was that the highway department pick up the [2:50] occasional roadkill, and they throw in the back [2:53] of the dump truck and bring it back, [2:54] and eventually it would be disposed of. Well, [2:56] one time they picked up a dead skunk [2:59] and parked it outside the building and went [3:02] in for lunch. Of course, that was right [3:04] by the air intake for the entire office [3:05] area. So they cleaned the office area out [3:09] pretty well. So air quality is was a [3:13] constant problem. There's been discussion about the wisdom [3:18] behind keeping equipment inside as opposed to outside [3:21] and we'll get into that in more detail [3:23] but I'll give you one example of why [3:26] it's worthwhile keeping in equipment in a secure [3:31] climate resistant enclosure. In my watch in 1990 [3:38] we purchased a brush band at 100 brush [3:40] chipper. Expected life on those in normal operations [3:44] about fifteen years. It was finally sold two [3:49] years ago traded in still in operating condition [3:53] thirty years of service. That's how much longer [3:57] a piece of equipment will last if it's [3:59] properly properly maintained and properly secured from the [4:03] elements. I don't know we still have them [4:06] down there but for a number of years [4:09] we had a bunch of nineteen eighty seven [4:11] Mac dump trucks which are still operation. So [4:13] that's one of the rationales that I have [4:18] for wanting to keep equipment properly safe and [4:21] secure. Employee recruitment and retention. In my career, [4:31] we had a number of opportunities to hire [4:33] female groundskeepers and tree climbers. And we were [4:37] able to get some very good ones. But [4:39] frankly, it's really tough, hiring female workforce which [4:43] is an increasing portion of the workforce in [4:47] the green industry if there are absolutely no [4:50] facilities whatsoever for women and no room for [4:52] them. No lockers no showers. So that's a [4:57] tough situation. And finally there's been discussion about [5:02] does engineering really need to be in that [5:04] building? You know can't you just rent some [5:06] space somewhere else and have them work remotely? [5:12] Engineering was in that building from 1969 when [5:15] it opened until 1987 when we moved them [5:17] up here when we renovated Town Hall. I [5:20] worked alongside them for those years. They stayed [5:25] either in Town Hall or over the Red [5:27] House for a number of years and a [5:28] couple of years back 2020 they moved back [5:32] down to to public works and the increase [5:37] in efficiency and command and control was breathtaking. [5:42] The difference, having the opportunity for an interface [5:47] between engineering and the folks that are actually [5:50] doing the work really increased the efficiency. When [5:54] you look at the very modest amount of [5:57] space we're talking about from the engineering department, [5:59] I think it's will pay many benefits. So [6:04] those are just a couple of my war [6:06] stories. I've got plenty of them if you've [6:08] lots of time. I will kick it over [6:11] to the town manager. Thank you, Dean. I'm [6:20] John Mangioradi. I'm the town manager. I've I've [6:23] worked here for six years, more than six [6:26] years, actually, and, this is a subject that [6:28] was discussed early on, when I arrived here. [6:32] Thank you to Dean's leadership of this effort. [6:35] Thank you to members of the billing committee. [6:38] It's it's been a lot of work to [6:40] get to where we are now. I'm also [6:41] gonna introduce members of the project team. I [6:44] wanna thank members of the audience that are [6:46] here. There's about, 20 maybe people here. There's [6:49] eight or nine people watching from home, and [6:52] hopefully, people will also watch this, later when [6:55] it's recorded. Just a programming note, if you [6:57] are at home, there'll be a point later [7:00] in the session where you can raise your [7:01] hand, and we'll we'll connect with you, to [7:04] ask a question or or or have a [7:06] comment, but not not till, the presentation is [7:09] concluded. So in addition to the, project, committee [7:13] that already introduced themselves, we have some staff [7:16] members that are involved with it. We also [7:20] have a the architecture and design team is [7:22] Weston Sampson, who you'll hear from in a [7:25] little bit. PMA consultants is our project manager. [7:28] They every every public construction project needs to [7:31] have three parties. The owner, which is the [7:34] town, the designer, which is Weston and Sampson, [7:37] and then the owner's project manager, which is [7:39] PMA. And their job is to help us [7:42] work with the architect to make sure that [7:46] the project is done efficiently and cost effectively [7:49] and appropriately. So we have a really good [7:52] team and we have a presentation to talk [7:56] about what we've done so far. I wanted [7:58] to also mention that this website has been [8:04] created actinma.gov/dpwfacility all one word. And so that [8:11] information about the project including this presentation will [8:15] be published there in addition to the materials [8:18] that are already on that web page. So [8:21] I think before we bring up Weston and [8:23] Sampson, think actually Dean, we had you programmed [8:26] to take on the next slide, which gives [8:29] us some more background, which I think many [8:32] of you have been following along this project. [8:34] But many of you this is your first [8:35] night hearing about it. And so before we [8:38] dive into the details of design, we wanted [8:41] to take a few minutes and just talk [8:42] about how we got to this point. So [8:44] thank you. Thank you. So you I've explained [8:57] to you my interest in the building and, [8:59] you know, why I've been pushing toward towards [9:02] getting this done. And I think it's important [9:05] to understand that this is a group effort. [9:08] It's something that's been embraced by the select [9:10] board. The, going back as far as 2020, [9:15] we've always had something to do with this [9:17] Public Works Building on our short term and [9:20] long term goal list. And, those are published. [9:26] They're a guidance document not only for the [9:29] select board but also for town staff to [9:31] know what we're moving towards. So starting very [9:37] early just with a feasibility study then the [9:41] getting moving ahead on the design of new [9:45] public works silly prioritizing existing fuel station in [9:50] twenty twenty two twenty three construction department public [9:53] works building and then most recently bring the [9:56] DPW facility project to town meeting in May [9:59] of twenty twenty five and that's what we're [10:01] moving ahead with now. The next slide. Yep. [10:07] So this is what we've done since then [10:10] in an attempt to secure those goals. We [10:15] did have a feasibility study, that is all [10:18] available online. We had a facilities feasibility study [10:23] committee that reviewed that study and they made [10:28] their presentation back in October of twenty two [10:32] basically embracing the conclusions of the feasibility study. [10:37] And we did some tours of the building [10:40] we did have subsequent to the feasibility study [10:45] committee going through and making their recommendation we [10:48] did go back to town meeting in May [10:50] of twenty three and '1 point '2 '2 [10:53] million dollars was allocated for the design of [10:56] the building. Subsequent to that we formed a [11:00] new committee that you see here which had [11:03] many of the same members but slightly different [11:05] focus. We did secure funding to build a [11:12] new public works fuel depot on the site. [11:17] The existing fuel depot is basically right in [11:19] the middle of the site and would create [11:22] some problems building the new facility, plus which [11:26] the tanks that were in the ground are [11:28] close to the end of the service life. [11:29] So it was going to have to be [11:30] replaced anyway. So first step is get that [11:34] piece of infrastructure out of the way and [11:37] then in July we did embrace this as [11:40] a short term goal to bring this to [11:42] town meeting and at this point I will [11:47] back off and let the experts talk. Thank [11:49] you. Thank you Mr. Charter. Thank you members [11:57] of the building committee and the town administration [12:00] DPW and the public. This is the agenda [12:04] for what we're going to present tonight. We're [12:07] going to delve a little bit further into [12:10] why a new facility is required or needed [12:12] for the town. Some of the project challenges [12:15] that we'll face. What are these benefits and [12:19] opportunities that a new facility will allow? Where [12:24] we are in terms of what we've completed [12:26] to date, and that is from the July [12:28] when we started the schematic design process through [12:31] tonight. What's left to do in schematic design? [12:36] And what's the proposed future schedule for the [12:39] project? Next slide please. So why a new [12:44] facility? Hopefully everyone's had a chance take a [12:48] look or visit the facility. I know Corey [12:52] has offered tours, I'm sure that he would [12:55] be happy to walk people through to take [12:57] a look at the facility as it is [12:59] today. Next slide please. The DPW is the [13:04] backbone of the community. They are first responders. [13:09] They are out on the roadways before other [13:13] first responders can get out on the roadways. [13:15] So they're out clearing the roads so that [13:18] the fire trucks, the police department, ambulances can [13:23] all assist the town. The departments are in [13:28] the DPWR, the administration and engineering, and these [13:31] are departments that will be housed at the [13:34] new facility. The highway department, trees and grounds, [13:40] fleet maintenance, they repair all the town trucks. [13:44] The facility would also support other department operations [13:48] such as cemeteries, recreations, operations, conservation and emergency [13:54] response. A larger facility could also assist with [13:58] some town functions such as they do now [14:03] with hazardous waste drop off day. Hopefully we [14:06] don't have to have a pop up health [14:08] clinic like we did during COVID again, but [14:11] a new facility would assist with that as [14:14] well. Next slide, please. This slide showing how [14:19] to dissuade day twenty twenty four. Next slide, [14:22] please. Again, first responders, some of the functions [14:26] that are provided by the DPW snow and [14:29] ice removal, hurricane, windstorm cleanup, removal of road [14:32] hazards, road repairs, support of other emergency departments. [14:38] Something to notice that, you know, if there's [14:40] a blizzard on Christmas Eve, they're out there [14:43] twenty four hours taking care of the roads. [14:47] Thank you. Next slide. The history of the [14:51] facility was, you know, this facility has been [14:53] on the site since 1970. Know, fifty years [14:58] ago, or over fifty years ago, another group [15:00] was sitting here talking about that facility, the [15:03] size it needed to be. Ultimately, was constructed [15:07] at 19,000 square feet, although the original recommendation [15:10] was 36,000 square feet. Total cost $10.62 a [15:15] square foot. Kind of wish we could get [15:18] that today. Next slide, please. Why do we [15:22] need a new facility again? The town, even [15:25] during the 60s, by the time that 1970 [15:27] facility had opened, the town population had exploded. [15:31] Number of roadways, miles had increased. It's increased, [15:34] the population has increased 10,000 since then. The [15:38] size of the trucks has increased. If you [15:40] look at a truck from 1970, you look [15:42] at a truck 2024, they're vastly larger today. [15:46] They have a larger plow attachment. The building [15:50] is too small. The number of, and types [15:55] of equipment has increased as well. So, you [15:59] know, the small facility has negative impacts in [16:02] terms of response time, employee safety and training, [16:06] health and safety of the employees, vehicle and [16:10] equipment, longevity, and increased maintenance requirements. Requirements. Next [16:14] slide please. The Dean mentioned indoor air quality. [16:21] There weren't a lot of codes back then [16:23] that dealt with stuff that we deal with [16:26] today. Concerns about health, employee health, indoor air [16:31] quality is a huge factor. Know, today in [16:36] this facility, they open the doors, turn on [16:39] a fan. There's no gas detection there's no [16:43] automatic ventilation to evacuate poisonous gas from the [16:47] space there is no HVAC system that keeps [16:52] and segregates fumes into one area and doesn't [16:56] allow them to migrate into office areas impacting [17:00] employee health. It's uninsulated, it's difficult to heat, [17:07] it's inefficient, structurally it's deficient, it is failing. [17:13] Next slide please. A of, so you know, [17:20] a lot of people will say, well, why [17:21] don't we rehab this building? Why don't we [17:23] try to work with it? It must be [17:26] cheaper to renovate this building rather than build [17:28] something new. Not necessarily. A public works facility [17:34] is considered by the building code to be [17:36] a category four structure, meaning it needs to [17:40] withstand the heaviest and most severe lateral forces. [17:45] It can't fall down during an earthquake or [17:49] heavy winds or hurricane. It has to stand [17:51] because of its vital importance to serve the [17:53] community as a, you know, for their role [17:57] as a first responder, similar to a police [17:59] department, similar to a fire department. In order [18:03] to get this building to perform in that [18:06] level category four, the structural improvements that would [18:10] be required would be cost prohibitive. And at [18:14] the end of the day, the volume of [18:16] the building is too small, it's still uninsulated, [18:19] it would still, it would be a costly [18:22] renovation that would end up with a building [18:25] that is inadequate for the money. Next slide, [18:30] please. Here are some examples of the structural [18:33] deficiencies. This is unreinforced concrete masonry block, meaning [18:38] that there's no rebar running vertically through the [18:42] cells of the block, tying it to the [18:44] roof structure, tying it to the foundation. So [18:48] when there's settling, when there's lateral movement, building [18:52] can fall down. Next slide please. Interior conditions [18:58] are substandard for the employees. There's inadequate space [19:03] for training. Top left photo is of their [19:07] meeting room, muster room, kitchen, conference room. Serves [19:12] all those purposes, but it's undersized for the [19:13] number of staff that they have. So they [19:15] can't train everyone in that room or even [19:18] half of their staff in that room. They [19:20] need to do training in the garage area. [19:22] It was mentioned there aren't any facilities or [19:24] locker rooms for women. This is a picture [19:26] of the men's locker room. One shower in [19:30] the entire building and it's pretty gross and [19:33] not used any longer. And this is not [19:36] a reflection on the efforts of the DPW [19:40] staff to upkeep the building. They have worked [19:43] incredibly hard to maintain what they have. It's [19:48] just getting more and more difficult to keep [19:51] up with it. The carpentry shop again, there's [19:54] dust, there's noise directly adjacent to admin staff. [19:59] And we have recycle bins in the lobby [20:02] of the admin office because there's really no [20:04] other place for them. Next slide please. This [20:08] is some pictures of mezzanine storage. Storage is [20:12] at a premium. These mezzanines were built at [20:16] some point in time. They certainly don't meet [20:19] OSHA safety requirements. It's not clear what they're [20:25] of they're rated for in terms of loading [20:27] and there's little headroom because they weren't, you [20:29] know, it's not a true two story space. [20:33] So you have electrical wiring, lighting and sprinkler [20:37] piping running at eyesight level on the mezzanine [20:40] which is dangerous. The stairs are open treads, [20:44] open risers and they don't meet current code. [20:47] Next slide please. This is an, you know, [20:52] again, spaces at a premium. You find room [20:56] where you can. Clearances are impacted. Ability to [21:02] circulate through the space is impacted, which is [21:04] dangerous. There's tripping hazards. There's no room for [21:11] workshop space, which is kind of jammed against [21:13] walls, but then directly adjacent to the vehicle [21:17] maintenance areas. It's very chaotic and they do [21:21] make do. Space isn't tall enough to fully [21:25] lift a large vehicle. A large vehicle can [21:28] be 13 feet from the floor to the [21:30] dump, top of the dump, and you really [21:34] need about 20 clear feet of space without [21:37] interference to get that vehicle up five, six [21:40] feet in the air, and they can't do [21:42] that. Next slide please. Storage outdoors is accommodated [21:49] in temporary shipping containers in a kind of [21:54] makeshift storage canopy area, which is starting to [21:58] rip and will need to be replaced shortly. [22:00] But that's where a lot of the lawn [22:01] equipment is stored right now. And then other [22:04] storage is kind of scattered on the periphery [22:07] of the site where space can be found. [22:10] Next slide please. This is the interior storage [22:16] garage. Dean mentioned the longevity of some of [22:20] these pieces of equipment. The reason that they've [22:23] lasted this long is because the DPW staff [22:26] makes a monumental effort to get these vehicles, [22:30] these very expensive town assets, indoors and out [22:33] of the elements. They can't get everything inside. [22:36] This is only 9,000 square feet. So there [22:39] is kind of like a game of Jenga [22:42] that takes place every day to stack the [22:47] equipment, make sure that the equipment that's prioritized [22:51] for work the next day is in the [22:53] right spot to get out. But if there's [22:55] a need to get a piece of equipment [22:57] that's buried, you may have to move seven [22:59] or eight vehicles to get that to that [23:02] piece of equipment to get it out, into [23:05] the yard. The plows that you see on [23:07] the top right corner, they they can't be, [23:10] typically, the best thing to do is, especially [23:12] during winter snow fighting operations, is to keep [23:15] the plow on your truck, bring it into [23:17] a a semi heated space, and you're ready [23:20] to go. At the end of a storm [23:23] event, to get the vehicles back inside, they [23:26] have to drop the plows outside. So keeping [23:29] that outside, they rust, the hydraulics become sluggish, [23:33] the hydraulic hoses become cracked, there's increased maintenance, [23:37] increased replacement cycle and cost. Next slide please. [23:46] Project challenges. Yes, I want to introduce Stella [23:51] Donahue, who's a sustainability specialist with Weston and [23:54] Sampson, and she'll continue the presentation. Hello, So [24:02] this project involves a handful of challenges. You [24:06] saw the existing conditions, I'll go over a [24:10] few main challenges for this project. Next slide, [24:13] please. So this, the approach for the design [24:16] is phased so we can maintain the DPW [24:19] operations during construction. So if you can imagine [24:22] building a new facility while trucks are maneuvering [24:26] the existing site, it's quite a challenge. So [24:29] there's the existing DPW building, there's the salt [24:32] shed, various outbuildings, and then all that truck [24:37] circulation from the DPW, but also the transfer [24:41] station at the south of the site. So, [24:44] also some large roll off trucks dropping off [24:48] the the waste coming up that drive, backing [24:53] into the ramp to dump the waste. So [24:56] all the while, building a new facility in [24:59] a phased approach while avoiding having to find [25:04] a site where temporary facilities can get can [25:09] maintain the operations during during construction. This allows [25:12] both to to go simultaneously. So, we've identified [25:16] this sort of purple hatch at the top. [25:20] That's where phase one can begin while the [25:24] DPW can remain operable during the process. Next [25:28] slide. Another aspect of challenges relates to the [25:33] energy goals. This town is beautiful and forward [25:36] thinking, so it is a stretch energy code [25:39] town. And and moreover, it's a higher tier [25:43] called the opt in specialized energy code, so [25:46] it's a stricter set of energy code requirements. [25:51] They also adopted a bylaw where any new [25:56] municipal building needs to be fossil fuel free. [26:00] And this project also anticipates the future fleet [26:04] electrification. So taking into consider into consideration space [26:09] needs and the infrastructure required to build that [26:13] in now so that down the road when [26:15] fleet turns over to electric, it can be [26:18] a more seamless process instead of having to [26:20] totally retrofit that space at that time. So [26:24] trying to be flexible and forward thinking. Next [26:27] slide. Another challenge, if you can imagine a [26:32] conductor for a symphony, we have a bunch [26:35] of underground systems that need to be coordinated. [26:37] So your stormwater drainage, managing the stormwater as [26:42] well as septic on-site, your electric utilities, and [26:47] this project is also pursuing geothermal wells. I [26:51] think upwards about 40 wells that have to [26:54] be 30 feet spaced out in diameter. So [26:58] there's a whole bunch of different systems being [27:01] coordinated under underground to make sure everything runs [27:04] smoothly. Next slide. So a handful of challenges, [27:10] but that also means there's a whole bunch [27:12] of opportunity and benefits that can come with [27:14] the modern new facility. Next slide. Primarily, a [27:21] new facility would allow for a great improvement [27:25] to operations in terms of efficiencies, safety, health, [27:31] occupant health, user comfort. So with the indoor [27:36] storage, we discussed that can increase the lifespan, [27:39] greatly reduce the maintenance needs versus being stored [27:43] outdoors in in New England's weather. Also, the [27:48] introduction of a wash bay which I'll get [27:50] into that can help to maintain the equipment [27:53] to wash off any salt corrosive conditions and [27:57] also prolong the lifespan of of these very [28:00] expensive trucks. A new facility would comply with [28:03] codes and regulations like the bylaw I mentioned [28:07] and building energy codes and OSHA. There could [28:13] also be a handful of, spaces in the [28:17] new building that other agencies in town can [28:20] use. So meeting space for, board committee meetings [28:24] like this. John touched on it, but and [28:29] Dean that this could greatly increase the employee [28:32] morale, training opportunities, and and pride for, working [28:37] for the town with the DPW. And then [28:42] just the simple fact that a new facility [28:44] could meet the demands of today, but also [28:46] for the next fifty to seventy five years. [28:48] Next slide. These are a handful of photos [28:53] of some example projects that show a more [28:57] modern today's standard facility. Top top left image [29:02] there is the training room. So that type [29:04] of space could be used during storms for [29:06] storm operations center. There's there's some consideration for [29:14] renewable energy that we're exploring, like the geothermal, [29:17] and this facility also will have roof solar. [29:21] And then the bottom left image, that's an [29:23] example of indoor fleet storage garage. And running [29:27] along the right side is mezzanine space. So [29:30] ample storage, which could be used by other [29:35] departments in town as well. I believe the [29:38] DPW currently stores some overflow material for other [29:43] departments like cemetery and conservation. So, those mezzanine [29:48] spaces are are, very beneficial for DPW and [29:52] the town as a whole. Next slide. Here [29:57] are a few other images of a a [29:59] modern facility. That center photo on the top, [30:03] the wash bay. Like I said, this can [30:05] help to wash off, corrosive salt buildup and, [30:11] again, prolong the life of these trucks, but [30:13] it's also a really great benefit for the [30:16] environment. The runoff gets filtered down and held [30:20] into a sump and disposed of properly versus [30:25] it running off into the environment, the landscape [30:29] around the site, which is maybe what's happening [30:33] now. And then the bottom right image that's [30:38] fluid containment. So if there's any spill, it's [30:41] contained with some curbing. Also minimizing the risk [30:45] for contamination and spills. Next slide, please. And [30:52] here's an example at site scale. It's worth [30:55] noting this is not a flashy building. It's [30:59] it's designed and built for its use. It's [31:02] it's rooted in functionality, so it's there's no [31:07] really frills beyond what it's serving, its purpose. [31:11] It has high volume spaces for the maintenance [31:14] to allow those large trucks to be lifted [31:17] and maintained with ease and efficiency. There's site [31:22] security and separate visitor and staff circulation. So [31:28] there's a safety and site circulation and improvements [31:34] as a whole to the site, to the [31:36] environment, stormwater management, and really just allowing for [31:43] a more smooth operational process. Next slide. And [31:49] another area of opportunity is for Acton DPW [31:53] to lead by example and really steward this [31:56] sustainable thinking, complying with the bylaw for one, [32:01] and improving stormwater, which correlates to the water [32:05] quality in town. There's also an opportunity to [32:11] work with Mass Saves rebate program. So by [32:15] pursuing these geothermal wells and, really maximizing on [32:20] energy efficiency, there's upwards of $2,300,000 in incentives [32:26] by running through this program, and that's just [32:29] for geothermal wells. There's there's other opportunities beyond [32:32] that. So there's some cost benefits in terms [32:36] of sustainability, and a facility like this can [32:40] can also lend to community resilience as a [32:43] whole. Next slide, please. This next section, I'll [32:49] give an update on, the work completed to [32:52] till today, really. So starting in mid July, [32:56] we conducted a review and confirmation process. This [33:00] is to confirm the program if there have [33:04] been any changes since this study a few [33:07] years prior to make sure we're capturing all [33:10] the facts and figures. So I I really [33:14] identify the key drivers for the program as [33:17] the users, the staff, the visitors, the public [33:20] interaction, as well as the fleet inventory, so [33:23] all the the trucks and equipment, trailers. So [33:28] you we take account of all the administrative [33:31] staff, the, workforce, any future considerations for vacancies [33:36] or future growth, and then how that translates [33:40] to locker room count, parking needs, etcetera. Next [33:44] slide, please. This is an overview. We confirmed [33:50] our understanding of the existing site. Just a [33:52] quick run through here. We have the DPW [33:55] Building in the salt shed and a few [33:59] storage buildings and containers surrounding the site in [34:02] the blue. There's a bit of storage creeping [34:07] beyond that that's left uncovered in the red. [34:11] So, all the plows we had mentioned. In [34:14] the orange is material bins. So, your gravel [34:17] and loam And then the green kind of [34:21] running the perimeter of the site and of [34:24] the building is your parking provisions, which is [34:29] also interfacing with that that purple dash line [34:31] which is representing the site circulation. So if [34:35] you're a visitor coming on to site, you [34:37] may be fighting with the truck circulation which [34:42] tends to be quite unsafe and and not [34:46] ideal. So, it's a bit chaotic. You have [34:50] few areas of building access in the purple [34:53] arrows. So those are overhead garage doors. Ultimately, [34:59] it's doing the best they're doing the best [35:01] they can but it is a bit choppy [35:05] site currently. Next slide, please. The review and [35:10] confirmation, we looked at the existing program, which [35:16] covers the building but also those areas of [35:18] storage efforts on-site. So the the building, the [35:25] storage building, the containers, and all those areas [35:28] without coverage. In comparison to the proposed program, [35:33] of course, it is an increase and a [35:35] bulk of that is the fleet storage garage [35:38] and a little rationale behind that is it [35:41] is about three times the size of what [35:44] you have what they have currently. But the [35:48] rationale is that there's these two rows on [35:50] either side of the garage with angled parking [35:53] and a center drive aisle. So that really [35:56] helps to improve your response time, the organization, [36:01] safety, and all the while, minimally conditioned. It's [36:06] it's not set to this room. It's it's [36:09] about 50 degrees. And it's it's also the [36:12] cheapest per square foot space to build in [36:14] these types of facilities. So it's it's, a [36:18] major benefit for for not the most costly [36:23] in terms of a new VPW facility. Next [36:26] slide, please. So once we confirmed our program, [36:31] we rolled into a conceptual design shred, which [36:34] looked at various approaches to a phased building [36:39] plan. So ultimately, we discussed the benefits of [36:45] the first phase, including both the fleet maintenance [36:49] and the fleet storage. So about two thirds [36:51] of the building can be constructed in phase [36:55] one. This also allows benefits like using that [36:59] fleet storage space for temporary shop facilities and [37:04] then coming back in to complete the building [37:06] with the phase three. Ultimately, the DPW decided [37:12] on a preferred alternative. Next slide, please. And [37:16] I'll just walk us through the process of [37:18] how this could look. So the image on [37:20] the left, the maintenance in the wash bay [37:24] and the fleet storage portion of the facility [37:28] as well as a canopy off the backside [37:30] of the salt shed could be built during [37:33] this time. Also at this time, we would [37:37] put together a privacy screen along the abutters [37:42] to help with noise and and headlights. Once [37:46] the building is demoed during phase two, we'll [37:50] introduce temporary facilities, so some trailers. And at [37:54] that point, the little orange box in the [37:56] fleet storage garage is a represents the the [38:00] temporary fit out for shop functions. Next slide, [38:04] please. So with the existing DPW building removed, [38:10] then the construction can shift to complete the [38:15] project with the shops, the employee facilities, and [38:18] the offices and so, the image on the [38:20] right there represents what a completed facility could [38:23] look like with with its parking and landscape [38:26] design as well. Next slide. So during this [38:31] time, we've also engaged with our engineers, the [38:35] the site civil group, our environmental group, and [38:38] industrial group. They've done their wetland delineation, some [38:42] geotech borings, and test pits. The industrial equipment [38:46] group has met with the mechanics to inventory [38:49] their equipment and tools, and they're working on [38:51] a equipment layout in the schematic floor plan. [38:56] We also met with, our rep from Eversource, [38:59] Trevor, and our green consultants, the green engineer, [39:04] as well as Acton Sustainability Group, our OPM, [39:09] and the DPW, and we discussed those mass [39:12] save rebates to better understand what that could [39:15] look like for this project as well as [39:17] potential pursuits for elite certification and just overall [39:21] sustainability goals for the project. Next slide please. [39:26] And a quick run through of where the [39:28] building plans are. So again, phase one is, [39:32] your fleet storage garage in the gray at [39:34] the top. Purple represents your maintenance base with [39:38] the wash bay off the end, as well [39:40] as an office for the mechanics and a [39:42] restroom facility. This phase is also critical to [39:46] include our utility spaces. So just to run [39:49] the building, but also provisions for the geothermal [39:54] mechanical space. And then just for reference, phase [40:00] three is outlined where it would go during [40:02] that time as well as the existing building [40:04] just to represent how we are we're maintaining [40:10] a setback from that building so that trucks [40:12] can still maneuver the existing site while this [40:15] portion of the facility is being built. Next [40:17] slide, please. And then phase three includes building [40:23] out the workshop spaces adjacent to the maintenance [40:27] and our employee facilities and offices represented with [40:32] the orange and the yellow. Next slide, please. [40:37] So here are a couple three d graphics [40:39] to help kind of understand those those spaces [40:42] a bit better. The high volume maintenance space [40:46] is, is dictated by a roof eave minimum [40:50] height to allow for our overhead doors, but [40:52] also all the lifts to be able to [40:55] function all the while, staying clear of any [40:58] overhead infrastructure like, fire protection, electrical. And because [41:04] of this high volume space, we also get [41:06] the advantage of building some mezzanine space over [41:09] those support rooms on that the far right [41:12] side. And similarly with the fleet storage garage [41:17] with that center drive aisle, the image on [41:19] the right, you can take advantage of that [41:23] height with the mezzanine that kinda runs, you [41:25] know, the length of that that back wall [41:28] And the large room on top of the [41:30] mezzanine, that is where we're currently locating that [41:33] geothermal mechanical space. Next slide, please. And these [41:40] last two images here, the the image on [41:42] the left shows a typical workshop fit out. [41:45] It's large enough to pull the truck inside [41:48] mezzanine space again due to its high volume. [41:51] It's premium space for without taking up any [41:55] more footprint. And here, this is this has [41:59] connection over to the the mezzanine on the [42:02] fleet storage side. So plenty of storage space, [42:06] which, again, can be maximized by the DPW [42:09] as well as some other departments in town. [42:12] And then I'll walk you through briefly the [42:15] administration block there on the right. So at [42:19] the bottom there signifies a public lobby where, [42:23] admin can interface with visitors through a service [42:25] window running around the perimeters of the building [42:29] are private offices and conference rooms. Within the [42:34] core of the building are the office support [42:37] areas like file storage, a layout space to [42:40] look at plans, And then kind of work [42:44] going toward the workshops in the rear are [42:47] the employee facilities. So spaces like the training [42:49] room, the locker rooms. And this this design [42:53] includes a a dedicated woman female locker room. [42:58] So, definitely can help improve the appeal for [43:00] female applicants and then, along the rear with [43:06] that does not need window access for daylighting [43:09] are your utility spaces. Next slide please. And [43:14] John will be closing up the presentation. Thanks, [43:20] Stella. Next slide please. So what's remaining for [43:24] the schematic design? We are submitting our plans [43:29] to our cost estimator and to the OPM [43:34] on October 4. Each, we expect about two [43:39] week turn, two to three week turnaround to [43:42] get the estimate back at which time we'll [43:44] reconcile the two estimates with each other. The [43:50] schematic design package will then be submitted to [43:53] the town which will include schematic level architectural [43:57] plans, elevations, sections, details, site civil plans, industrial [44:02] equipment plans. We'll have mechanical fire protection, structural [44:06] engineering, design narratives, geotechnical report, the schematic design [44:12] cost estimate, and the sustainable design narrative. Next [44:16] slide please. What's proposed for the schedule moving [44:21] forward? Next slide, please. So the goal is [44:25] to have the design development permitting and public [44:27] outreach occur next. So that's November of this [44:31] year through April of next year. We want [44:35] to have again at the end of DD [44:37] we'll have another cost estimate done by the [44:41] OPM and done by our independent cost estimator [44:45] which time we'll we'll bring the project to [44:48] town meeting for consideration if the project passes [44:53] the plan is to have construction occur starting [44:56] in the summer of of twenty twenty five [45:00] I'm sorry, pardon me. A backup. We'll finish [45:03] our construction documents, bid the project in the [45:06] fall of twenty twenty five, and then anticipated [45:11] two year construction schedule. A little longer than [45:14] a typical DPW because of the phasing aspect. [45:16] So we'll have to have a little bit [45:19] of time to move between phase one and [45:22] phase two, bring in temporary facilities, demo the [45:26] building, and then come back and complete the [45:28] building in the site. Next slide. And thank [45:33] you. That's our presentation and we welcome any [45:37] questions that you might have. All right. Can [45:53] you hear me? First, I had one thing [45:56] to say but after seeing the presentation, I [46:00] have one more thing to say. I had [46:03] a house renovation a few years back and [46:07] I thought I had it estimated properly. I [46:09] didn't. I have a garage that's starting in [46:13] the fall, houses my little John Deere tractor. [46:17] It's the smallest diesel tractor. Problem was they [46:20] needed my garage to do their cutting and [46:25] staining and everything else. So my tractor was [46:28] outside. Well, I went out there one day, [46:32] started up, and I heard a big bang. [46:35] I have some big black walnut trees. The [46:38] squirrels decided to store them all under the [46:40] hood. They took the fan, broke it, which [46:44] went into my radiator. Got that in to [46:47] do some work, and they came back and [46:49] they said, Oh, the nest is in there, [46:51] and the urine has destroyed your wiring. So, [46:57] I mean, I can see why you want [46:59] to put things inside. Not only that, but [47:01] later in the year, when I finally got [47:03] it back, and I'm out there snow blowing [47:05] my driveway, or I should say I wanted [47:09] to, it was really hard to get it [47:12] started compared to the old days where I [47:16] knew I had to get to the train [47:17] station at 06:20, I'd figure out how much [47:19] snow we had. I get out there, get [47:20] into my garage, turned it, started right up, [47:25] and I'm out there doing the work and [47:26] getting the work on time. So there's a [47:29] lot to say about having equipment inside instead [47:32] of outside. But the one point I wanted [47:35] to say initially, when I was thinking about [47:38] this tonight, is I do a lot at [47:41] our senior center. And I talk to the [47:43] people there. And back when we were looking [47:46] at the operational override. I had a lot [47:50] of people as I'm talking to them said, [47:53] you know, aren't we redoing the DPW? So [47:58] we really don't need this operational override? You [48:01] know, I'd rather spend the money on the [48:02] DPW site. Now, override passed and now we're [48:08] looking at where do we find the money. [48:10] So I'm hoping that the finance committee, the [48:13] select board, and others list to this and [48:16] really work really hard to get that school [48:19] budget down, not up, so that we have [48:23] the money for the DPW which is necessary. [48:26] Thank you. I'm sorry. Leo Fodgman, Wright Terrace. [48:32] Anyone else? Hi, I'm Corinne Hogseth. I live [48:38] in Indian Village. I had a question about [48:40] the geothermal and the solar stuff. I'm wondering, [48:45] I know you don't have a cost estimate [48:46] yet, but when it comes in, I hope [48:48] that we can see what kind of a [48:50] premium we're paying for the green part of [48:53] it. Thank Yes. And and there is a [48:57] premium. And there's that's the reason why there [48:59] are the rebates to incentivize spending extra for [49:03] that. But there are also paybacks. So that [49:07] will be included as well. We're proposing closed [49:11] well for the geothermal. There's two types, guess, [49:15] closed and open. The close is a bit [49:17] more expensive, but it's also more environmentally conscientious [49:20] and I know there's a concern in town [49:22] for contamination of soils and high conductivity of [49:28] waterways so that's the reason for that. I [49:33] wrote down my remarks so I wouldn't forget [49:36] them or go off script. Hello, Acton friends. [49:40] My name is Eric Heals. I am 58 [49:42] years old, an Air Force veteran, small business [49:46] owner, Clock Tower Law, and a long time [49:49] Acton visitor and resident. In 1975, I first [49:54] visited Acton when helping family friends move from [49:57] Andover to Acton's Indian village. In 1983, those [50:01] same friends moved to Acton's Robbins Park. In [50:04] 1995, shortly after graduating from law school, I [50:08] first moved my family to Acton. But we [50:11] could not afford to buy, so we rented [50:13] a ranch in West Acton. In 1996, we [50:18] moved to Marlborough again because we could not [50:20] afford to buy in Acton, but also because [50:22] Marlborough High School students at the time could [50:26] attend the newly expanded Acton Boxborough Regional High [50:29] School to offset cost of expansion. In 1998, [50:34] my work resulted in a two year stint [50:36] in Denver, Colorado, but we returned home to [50:38] Acton's Minuteman Ridge in February, just before my [50:42] oldest child entered first grade. Divorce and remarriage [50:46] resulted in two more moves. And since 2013, [50:50] Rebecca and I have called 17 Forest Road [50:53] home. Now I'm going off script. You've seen, [50:56] three houses to the north of Forest Road [50:59] on all those overhead slides. Mine is the [51:03] northernmost one of those three. 17 Forest Road. [51:08] It's the yellow house with the chainsaw bear [51:11] out front and the fenced backyard. Together, Rebecca [51:15] and I have put five children through the [51:17] AB school system, and our youngest, Freddie, is [51:20] a senior at ABRHS. I have been a [51:23] good steward of 17 Forest, and I have [51:26] been a good neighbor to the DPW and [51:29] to others. For example, I store a snow [51:31] a snow plow on my property for a [51:34] Venezuelan friend who plows for the town of [51:36] Acton because he is not allowed to store [51:39] the plow at his condo. Over the years, [51:42] many vehicles have pulled into my driveway or [51:45] rung my doorbell looking for directions to the [51:47] DPW. And while I live across the street [51:50] from the dump, otherwise known as the transfer [51:52] station, I have never been to the dump. [51:55] I much prefer a Marlborough centralized recycling and [51:58] trash system, which, like school buses, is much [52:01] more efficient than having thousands of cars do [52:04] the same task. And in fact, the only [52:07] time I had been to the DPW is [52:08] to deliver mail and packages dropped off at [52:11] my house by mistake. The DPW, on the [52:14] other hand, has not been a good neighbor. [52:17] Robins Park families in general and residents of [52:21] Hosmer Street and Forest Road in particular already [52:25] bear a disproportionate amount of traffic, especially on [52:29] Saturday afternoons going to the dump, often speeding [52:32] at close to twice the posted speed limit. [52:35] And some of the worst offenders are those [52:38] who work at or fuel up at the [52:40] DPW. The majority of residents on Forest Road [52:44] own dogs, and the lack of sidewalks in [52:47] the neighborhood combined with the amount and speed [52:50] of traffic makes walking with or without dogs [52:53] treacherous. I was a cat person for forty [52:56] seven years, but our family decided to rescue [52:59] a stray dog last year. Her name is [53:01] Piper. We walk Piper twice daily and multiple [53:04] times per week. We have close calls with [53:07] Acton bus, DPW, fire, police, and rescue vehicles. [53:13] When driving on the highway, we were all [53:14] taught to move over a full lane for [53:16] cars on the shoulder. We should all do [53:19] the same thing on neighborhood roads. Recently, a [53:22] dog was struck by a speeding vehicle on [53:24] Minot Avenue, and the dog had to have [53:26] one of its legs amputated. Yet when sidewalks [53:29] were added to Minot Avenue and Taylor Road [53:31] A Few Years ago, the entrance to Forest [53:34] Road from Minot Avenue was inexplicably widened, allowing [53:39] speeding cars to take that corner even faster. [53:44] It's also where the sidewalk ends. The proposed [53:47] DPW construction project will add additional noise, traffic, [53:51] and danger for already overburdened Robins Park families. [53:56] So I believe that much more needs to [53:58] be done for the residents of Robins Park [54:00] before this construction project starts. The vegetative buffer [54:04] referred to on the project website has decreased [54:07] in density and effectiveness every year that I [54:09] have lived here, most notably due to the [54:12] twenty eleven October snowstorm and the September 2023 [54:16] microbursts, both of which took out many mature, [54:20] mostly oak trees. If you lived here, what [54:23] would you ask for? Sidewalks, narrowing the forest [54:27] Binaught intersection, planting evergreens such as hemlocks, rhododendrons, [54:31] or the like on the perimeter of the [54:33] vegetative buffer, replacing the always on DPW spotlights [54:37] with motion lights, being a better neighbor. I [54:41] understand that this project has been in planning [54:43] for quite some time, but the first direct [54:46] communication that I received about it was Acton's [54:49] September eighteenth letter announcing this public meeting. That [54:53] was eight days ago. I have been a [54:56] good steward of every property that I've ever [54:58] owned, and I have been a good neighbor [54:59] everywhere I have lived. The town of Acton [55:02] can and should do better. Sincerely, Eric Heals, [55:07] Actonian since 1995. Thank you. Anyone else? Miss [55:15] mister Heal, if you could either email a [55:20] copy of your remarks or or hand them [55:23] over to us. That's exactly the kind of [55:26] input that we wanted and I appreciate the [55:32] fact that obviously we're an industrial operation. We [55:35] do have impacts on the neighborhood. And these [55:40] are the same sort of issues that were [55:42] raised with the North Acton Fire Station. So [55:45] we worked closely with the neighbors there to [55:47] try to do whatever we could to mitigate [55:50] the impact of that facility. And certainly, I [55:53] hope to do the same with the Public [55:54] Works Building. Thank you for your comments. Three [56:02] case sorry. I was hit almost twice on [56:07] hazardous waste day. Hundreds of cars queued up [56:11] outside of my house. I was three you're [56:14] shaking your head no that I wasn't hit? [56:18] I know what you're Yeah. That's you're saying. [56:21] Yeah. Today, walking the dog, in the rain, [56:26] three case bus drivers drove by the case [56:28] bus drivers, by the way, are the least [56:30] bad of the offenders. But two of them [56:32] almost hit me today. And so it's a [56:35] it's a daily occurrence. I I don't know [56:37] if this committee is is coordinating with the [56:39] sidewalk committee. Don't know how you prioritize where [56:42] the sidewalks go, but if you ever wanna [56:45] try to take a a left turn walk, [56:47] walking down Forest to Hosmer or to Whittier [56:49] or to Forest, man, you take your life [56:51] into your hands doing that every day. Hosmer [56:54] is even worse. People drive 50 or more [56:56] in Hosmer, especially on Saturdays. It's nuts. So [56:59] I'd invite you to come over to my [57:01] house on Saturday and watch what it's like, [57:04] especially around 03:00, four o'clock. And not once [57:07] since 1995 have I seen the police pull [57:10] anybody over in any residential neighborhood in Acton. [57:13] Not once. Come on a Wednesday to see [57:15] what it's like with the the noise and [57:17] the construction and the and the speeding. And [57:19] now you're gonna take half of the trees [57:22] away. That's what the plan looked like to [57:24] me, about half of the trees. And it's [57:26] half of the trees have already come down [57:28] in that same area since I've lived there. [57:30] I can see the buildings clear as day [57:32] from my front yard just as you can [57:34] see in my house on all those photos. [57:36] And I first found out about this project [57:38] eight days ago. Thank you. I just have [57:56] kind of one general question. Look at Scott [58:00] Sullivan, a Patriot's room. Understanding the presentation with [58:06] the gist of it being that the urgency [58:08] and need to to have this done and [58:12] seeing all the support for that. What I [58:15] am confused with is the phased program of [58:21] doing this over multiple years, which in my [58:24] mind would increase the cost, probably prevent an [58:29] urgent response and cause delays on having the [58:34] facility operate the way it needs to operate. [58:37] And after going to Planet Fitness every morning [58:39] and watching a building go up in literally [58:41] one month over the summertime. I'm not understanding [58:45] why or or maybe you already have an [58:48] analysis on if this was built during the [58:53] warmer months so that there's no snow or [58:55] ice and things could just be done faster [58:59] so this could be resolved quicker. I'm hoping [59:03] in your final analysis that that is a [59:05] scenario that's presented. Maybe just to respond quickly [59:14] to that. Mean, we all want the construction [59:16] to occur as quickly as possible. The purpose [59:20] of the phase plan is to maintain those [59:23] operations as best we can. There isn't anywhere [59:26] in town to move to on a temporary [59:29] basis and that building is in the middle [59:31] of the site where we need to build [59:33] a new facility, a new site, a new [59:35] parking. So unfortunately, we initially thought we could [59:40] maybe find an industrial spot where we could [59:43] relocate the DPW, but there really isn't any [59:46] place in Acton or in Concord or any [59:50] in Stowe or any nearby community where that [59:53] type of facility would could be found. And [59:57] it would be expensive because of the unique [1:00:00] needs of the fleet maintenance department. They need [1:00:03] to fit out a new space completely. So [1:00:05] the purpose of the phasing itself is to, [1:00:09] it mainly based around those needs because we [1:00:11] need to get fleet maintenance up and running [1:00:14] in a new facility and kind of seamlessly [1:00:16] transition them and that will maintain those operations [1:00:20] as best as possible. The building type that [1:00:24] is most economical for a DPW that provides [1:00:27] these very long spans, it's called a pre [1:00:29] engineered metal building. There's always a lag time, [1:00:34] unfortunately, between the time you can get one [1:00:37] of those buildings into production. There's a lot [1:00:40] of review back and forth of shop drawings, [1:00:43] coordination of utilities, and so forth. So from [1:00:47] the time that the building is ordered until [1:00:49] delivered and constructed, there's a pretty significant lag [1:00:53] in time. We still think it goes up [1:00:56] faster than a lot of traditional buildings and [1:00:58] is the most cost effective type of building [1:01:00] to use for the DPW facility. So I [1:01:04] do appreciate your concerns and we do try [1:01:07] to you know reduce the timeline as much [1:01:10] as possible and phasing does add to the [1:01:12] timeline I agree. Greg Jarboe, five Cherokee Road. [1:01:24] To follow-up on the the timing issue. How [1:01:27] many filed sub bids will this kind of [1:01:30] construction require? Quite a number. Yeah. Fortunately not [1:01:35] roofing because that's part of the building package [1:01:38] itself, but it could be 11. It could [1:01:41] be yeah. Yeah. The quantities of ceiling tile, [1:01:44] floor tile, miscellaneous metals, painting, masonry, electrical, HVAC, [1:01:52] plumbing, fire protection. Yeah. There's a lot. Yeah. [1:01:54] And that's that's very typical for, this type [1:01:57] of building. That that I'm aware. I haven't [1:02:00] lived in town as long as Dean, but [1:02:03] I've been in Acton since 1978. And from [1:02:08] '79 to '81, I was a legislative aide [1:02:11] to a state senator who chaired the state [1:02:14] administration committee when we got the ward commission [1:02:18] report about public construction in Massachusetts. And one [1:02:24] of the things that drives up the cost [1:02:26] of public construction in this state versus private [1:02:29] construction is the filed sub bid law. And [1:02:34] every time you have 11 or more different [1:02:39] sub bidders waiting for the other guy to [1:02:44] turn up to do their part, money money, [1:02:52] you know, goes out the window. So, again, [1:02:55] if facing this over two years seems prudent [1:03:01] and we don't have a cost estimate yet, [1:03:04] but, I gotta believe that one of the [1:03:06] ginormous cost drivers is gonna be time. It [1:03:16] it it is and filed sub bids are [1:03:18] just unfortunately part of the chapter 149 reality [1:03:21] that municipal projects have to deal with. Yeah, [1:03:32] I wonder if you could speak a little [1:03:33] bit to environmental studies soil sampling. You did [1:03:37] mention core drilling. I assume that's probably for [1:03:39] the geothermal, but is it also to explore [1:03:41] whether there's anything on-site that could be ledge [1:03:44] surprises in other ways? So the geotechnical investigation [1:03:49] was for the for the kind of the [1:03:52] structural evaluation of the soil capacity. Not yet [1:03:56] for the geothermal. We need to bring on [1:03:58] a well, a test well to evaluate the [1:04:02] ground capacity for geothermal. For environmental, you know, [1:04:07] this is a historical fifty year, more than [1:04:11] fifty year DPW site. It has had past [1:04:13] remediation. There was a dry well that was [1:04:17] abated 2,004, two thousand and eight, something like [1:04:20] that. So we, you know, and we also [1:04:23] work on a lot of different DPW sites, [1:04:25] but we are going to perform an environmental [1:04:30] evaluation. And at least for the initial cost [1:04:34] estimate, we're going to assume the site is [1:04:37] gonna be an export site largely. We're gonna [1:04:40] be removing soil from the site. So we [1:04:43] have to assume a percentage of that is [1:04:45] going to be contaminated soil. And we're going [1:04:48] to do our internal review. We don't have [1:04:51] to do a full phase one yet. We [1:04:52] don't have to do a full phase one [1:04:53] because the town owns the site. But we [1:04:55] do have to do an environmental assessment. And [1:04:58] we're gonna, once we complete that, we'll get [1:05:02] more data and revise our estimate as more [1:05:05] information becomes available. And so then my follow-up [1:05:09] question to that would be, what's the timeline [1:05:10] for that? I didn't see it on the [1:05:12] recent timeline that was given in terms of [1:05:15] where it We're performing the environmental now and [1:05:19] design development will be when we kind of [1:05:21] investigate further the next phase of design. So [1:05:25] that's taking place starting November. You're welcome. Well, [1:05:40] thank you unless there's any other questions, that [1:05:43] pretty much brings the public presentation to an [1:05:49] end. Thank you, John. Thank you, Della, for [1:05:52] a great presentation. Assistant town manager did note [1:05:59] a website. It's available. And we'll be posting [1:06:03] all of these documents. This presentation will be [1:06:06] available online as well. I encourage everyone to [1:06:12] reach out to all members of the committee. [1:06:15] I have a stack of my business cards [1:06:20] where I'd be happy to have people contact [1:06:22] me directly if you have any particular questions. [1:06:25] And I know that the town manager and [1:06:27] the assistant town manager and everyone in the [1:06:29] design team is eager to hear whatever input [1:06:32] you've got. The committee has not met since [1:06:39] March because we had so much prep work [1:06:42] to do with procuring the project manager and [1:06:46] the architect. But we will, later on tonight, [1:06:50] be determining a projected meeting schedule for the [1:06:54] next few months. And certainly if you would [1:06:58] like to get any more information, reach out [1:07:01] to us. Thank you. David? The committee's email [1:07:07] address is not on the website. I bet [1:07:11] that's going to get fixed. Thank you. Alright. [1:07:22] To, committee business for members of the committee. [1:07:30] Pull up the agenda. First item business we [1:07:39] do have a set of minutes, which I [1:07:42] think I've sent out a couple of times. [1:07:46] The, some of the members were not here, [1:07:50] for the particular meeting, but we'd like to, [1:07:54] get these meetings, these minutes reviewed and approved [1:07:58] so that we can get them posted. Town [1:08:01] Clerk's office. Mr. Chair, I move to approve [1:08:04] the minutes of, I believe it's 03/01/2024. Thank [1:08:09] you. You got a second? I'll second. Okay. [1:08:14] Moved and seconded. Any comments, questions? Just a [1:08:19] question. I wasn't present for the meeting, but [1:08:22] I have read the minutes. Should I vote [1:08:23] or abstain? I believe. I believe you can [1:08:30] vote for him. Okay. All in favor of [1:08:35] accepting the minutes of the March 1 meeting [1:08:37] please say aye. Aye. Opposed? Abstentions? Thank you. [1:08:47] We are going to be making a further [1:08:52] presentation to the select board. I've been pretty [1:08:55] much updating the select board for every one [1:08:57] of our meetings. So I will be working [1:09:03] with the select board chair as far as [1:09:05] setting aside a time so that we can [1:09:07] do a more timely update. Again, we talk [1:09:15] about process receiving input from residents. I know [1:09:17] some people have reached out already and I [1:09:21] hope to meet with, I believe it's Alice. [1:09:25] Thank you. So we can discuss the questions [1:09:30] that you've raised. I can't hear much either. [1:09:42] So Nothing came out of the drain that [1:10:14] I'm talking about. And nine chuckle fulls would [1:10:17] have a machine with two little, like, fork. [1:10:20] They took nine bucket loads out of that. [1:10:22] I thought, now it's that train. Why they're [1:10:25] so close together? I don't know. What has [1:10:27] really happened is that years ago, like, the [1:10:36] driveway, the road got higher and higher and [1:10:38] higher. And I said to one gentleman, I [1:10:41] I have to teach my car how to [1:10:43] jump if we replace this program one more [1:10:45] time and which really is a fight. So [1:10:48] now there's a there's a plunge because the [1:10:52] drain is too high or I'm too low. [1:10:56] Whatever. I'm in the low spot, obviously. It [1:10:58] didn't start that way, but it ended that [1:10:58] didn't start that way, but it ended that [1:11:00] way. Whatever. I'm the low spot, obviously. It [1:11:00] way. So they I'm asking if you could [1:11:03] build it takes probably an hour and a [1:11:05] half to build my driveway up up or [1:11:08] take that drain out so we have you [1:11:12] you know what I'm saying? I I know [1:11:14] what you're saying. I'll because everybody now with [1:11:17] the DPW knows the virgin drain. And the [1:11:21] engineer, I won't say any more than that. [1:11:25] I've had many conversations with her. I'm on [1:11:27] the list, and I said, I guess my [1:11:30] fear is I'm not gonna live long enough [1:11:32] to see if oh, you're on the list. [1:11:34] I said, may I see the list? No. [1:11:35] Of course not. So my question is my [1:11:38] first or my hundred and fortieth. So, there's [1:11:41] no answer. We'll try to get you that [1:11:43] answer. Yeah. And. I don't have my card [1:11:47] with me. Apologize. But reach out to me. [1:11:53] At any time. I'll discuss that. How is [1:11:58] it be? Can I ask one question? Sure. [1:12:01] Because I'm literally next door. Yes, you are. [1:12:04] And that's not a problem for me. I [1:12:07] mean, the noise sometimes is, you know, puts [1:12:09] a when the salt when they're using the [1:12:12] salt thing and that thing backs up. I [1:12:14] mean, it's it's it and I know they [1:12:16] have to do that, but I don't really [1:12:19] have to stand by because I'm on a [1:12:20] farm and we have to do the same [1:12:22] thing. It's that big, loud, big, big noise. [1:12:25] So you get used to it. You get [1:12:28] used to it. And plus, I'm grateful because [1:12:30] I wanna be the first person plowed out. [1:12:32] So that works for me. I'm glad. Yeah. [1:12:36] No. They I think the people there are [1:12:37] very, very nice. I think I think part [1:12:40] of the the site plan that we hope [1:12:44] will help things for the neighbors is that [1:12:48] although the building is going to be closer [1:12:49] to Forest Road than the existing building. We [1:12:52] hope that it's going to create a a [1:12:55] a shield for noise and for headlights. I [1:13:01] know when you wrote to me earlier, you [1:13:03] wrote to the committee earlier today, today. I'm [1:13:06] certainly, you know, sound fencing and that sort [1:13:08] of stuff. Those are the kind of amenities [1:13:10] that we wanna consider. Well, you know, like [1:13:13] on the highways, they have fences as high [1:13:16] as this room. Yeah. Is that to block [1:13:19] noise or is that Noise. It is really. [1:13:23] Well, I guess when I see that, when [1:13:24] I drive on the highways, I'm like, oh, [1:13:27] fencing. Wow. Well, that's the flip side of [1:13:31] it. You wanna look at that in your [1:13:32] backyard? I'm fine with that. Okay. Okay. Yeah. [1:13:39] I'd rather see that than cars and trucks. [1:13:41] Great. And plus, I want my deer to [1:13:44] have a my deer have a track through [1:13:46] the back. They used to come around through [1:13:48] my house, and I bought I bought some [1:13:51] of those solar creepy things. Yep. So now [1:13:54] they go all the way around the back [1:13:55] of my house and in between the two [1:13:58] houses and across the street. I'm like, perfect. [1:14:01] Perfect. And they mow down across the street. [1:14:05] Yeah. So then I'll come they don't come [1:14:07] at all of my property. Alright. But I'm [1:14:09] not seeing them come through because they're beautiful. [1:14:12] Yeah. I will I'll follow-up appreciate that. See [1:14:17] if we can do it. If you, you [1:14:18] know, at any time, give me a call. [1:14:20] Give me a call. I sent you pictures. [1:14:23] I I remember we had the discussion. Yeah. [1:14:26] Couple of years ago. Videos of them cleaning [1:14:28] out like, do you mind gonna call it [1:14:30] a virgin drain? It's never been used. It [1:14:32] doesn't hurt my feelings. No. I mean, it's [1:14:36] useless. I'll follow-up. Engineer, how come there's two [1:14:43] drains here and one is so high that [1:14:44] no water can go in it? Who who [1:14:46] designed that? Did you look at it? If [1:14:48] you did, don't answer the question. Good night. [1:14:52] Thank you. Thank you very much. Next question [1:15:13] for the committee is figuring out a schedule [1:15:18] of upcoming meetings. I don't believe the, the [1:15:27] estimate is going come back around the October [1:15:29] 18. And I'm certainly happy to meet as [1:15:34] often as folks want, but I don't know [1:15:37] as we'll have a whole lot of new [1:15:38] information to talk about before then. So I'm [1:15:42] kind of looking towards the October for our [1:15:46] next meeting. And I guess the other question [1:15:54] is, is there any particular meeting night that's [1:15:59] better or worse for folks? Well, the first [1:16:02] question I would have is do we know [1:16:03] that the eighteenth is the date that the [1:16:05] estimates come back or is that just an [1:16:07] approximation? It's an approximation that he had commented [1:16:10] two to three weeks. So that's a two [1:16:12] week projection. Have to come back. Yeah yeah [1:16:20] it could be an early November yeah early [1:16:23] November ish. The third Thursdays tend to be [1:16:31] open for me. Would the would folks be [1:16:37] interested for a meeting on November 7. Yes. [1:16:49] Why don't we tentatively aim for November 7 [1:16:53] for our next meeting and then I'll work [1:17:00] out a let's see why don't we schedule [1:17:03] one more after that and Dean just to [1:17:06] confirm these would be evening meetings 7PM evening [1:17:08] meetings same setup we can do yeah okay [1:17:11] and I think you know we could probably [1:17:16] if Room 9 is available, that would be [1:17:21] good. Well, this room, I mean Yeah. We [1:17:24] we may my my recommendation would be to [1:17:27] stay in here so we can continue holding [1:17:29] Zoom in a bigger public audience because if [1:17:31] we do receive any financial estimates back we're [1:17:35] gonna have a little bit of a crack. [1:17:36] I think people will be here. Yeah. Which [1:17:38] is a great thing. Yep. And hopefully more [1:17:40] people show up every meeting. We'll we'll plan [1:17:44] on November 7 here in this room and [1:17:47] then we wanna put another one in at [1:17:55] the November in case we in case we [1:18:01] get in let's see I was gonna say [1:18:04] the twenty eighth but I think that's Thanksgiving. [1:18:05] Thanksgiving. It's an interesting way to celebrate but. [1:18:09] Yeah. Not the way I want to celebrate. [1:18:12] How about the fifth? The fifth, I know, [1:18:15] I'm not going to be available but I [1:18:17] could certainly. What are the things from the [1:18:22] timeline after. I'd be happy to let someone [1:18:31] else. We can also wait until the October [1:18:34] meeting and make a. Yeah. Meeting at that [1:18:36] point. Yeah, let me do that and see [1:18:37] what. Yeah, I'm just bringing back up that [1:18:39] time on that to discuss. Okay. So, November [1:18:43] 7, we'll meet here. And thank you very [1:18:48] much and we need one more motion. I'll [1:18:52] move to adjourn. I'll second. Okay, move in [1:18:56] second to adjourn. All in favor, say aye. [1:18:58] Aye. Opposed? Substentions? Thank you.