[1:50] All [2:02] right, good morning everybody. It's 11:30. We'll get started with the [2:05] pre-commission agenda. Um, no president's report uh from me today [2:10] except other than to say happy birthday to Commissioner Gold Thorp. It's [2:15] officially his birthday. [2:21] Bill officially the oldest employee at ACD. [2:25] » Madame President, >> it is true. [2:28] » Commissioner McKini. >> Uh, yes. Given that Commissioner Goldorp [2:30] has set the precedent for singing to people experiencing a birthday. [2:36] » I believe that um, turnabout is fair play. So this week we all need to sing [2:40] for Commissioner. >> We have a big audience here today. [2:43] » So at an appropriate time in the meeting. I don't know if now is the [2:46] appropriate time. >> I think now is a good time. do it now. [2:50] » All right, everybody. Are we ready? >> Happy birthday to you. [2:57] » Happy birthday to you. Happy birthday. [3:07] Happy birthday to you. [3:16] I don't know what to say. [laughter] [gasps] [3:20] » All right. Are there any uh general housekeeping items or discussion of the [3:23] agenda from the commission? >> Madam President, [3:25] » Commissioner Nielson, >> I just want to share some happy news. Um [3:30] I just want to thank and I'm full of gratitude to the entire team, [3:34] particularly director Head and Stacy for taking good care of me as I've I've [3:40] tried to manage an illness since January. And I'd like to report that so [3:44] far today I'm cancer free. So and uh [3:52] I know there's there's several members of the the staff here have had their own [3:56] journey and uh all the power to you and I would expect everybody would get the [4:01] same level of support that I've had. So thank you very much full of gratitude. [4:10] » That's wonderful news. Any other um housekeeping or agenda [4:16] discussion? All right, seeing none, we'll hand it [4:19] right over to Director Head for the director's report. [4:26] » Wonderful. Madame President, commissioners, and congratulations, [4:29] Commissioner Nelson. Um and congratulations, Commissioner Goldthorp. [4:33] We uh [laughter] um in true commission fashion, you're [4:38] always one step ahead of me. So, uh, um, we do have some some cake to share [4:44] during the break. Uh, commissioners, just a couple, um, [4:49] updates for you today. Uh, in the news this week, we had EJ who who shared an [4:56] update on the Eustic 10 mile to lender project. That project is um, making good [5:01] progress. It is open one lane in each direction at this point in time, and [5:05] we're shooting for the end of October uh, to have that project fully open. So, [5:09] good progress is being made there. Uh, we also had Aaron uh Williams on to [5:15] speak with the statesman about the Swan Falls project. Uh, project, this is the [5:20] bridge crossing. Um, project was accelerated thanks to the federal [5:24] funding that we got for the design of that. Um, it's now in the 5-year plan, [5:29] uh, with the design to be finished by 2029. So, uh, this is the project that [5:34] spans the the railroad tracks and the and Indian Creek. um uh pretty big deal [5:40] for CUNA for quite some time and we're excited to see that project moving [5:43] forward. So, thanks to both EJ and Aaron for their uh coordination and [5:48] communication with um our local press. Uh commissioners, just a couple um [5:55] updates on some projects that are um in the works just to make sure that you're [5:59] fully um on board with the uh what's going on. These are some larger projects [6:04] here. Uh many of you are are well aware of the Dry Creek development that's [6:10] happening off of Highway 55 at Dry Creek Road. Um as they move into the next [6:14] phase, one of the things that's um they're ready to begin work on is the uh [6:21] crossing of Quail Valley or Brookside that extends into Quail Valley over to [6:25] Dry Creek Roads or there'll be another um way out of the neighborhood. Um, in [6:31] order to do that, um, and and prepare for that, they are in the process of [6:36] there's going to be a closure, a six-week closure. Now, speaking to the [6:40] good of our team, I think the original request was for 10 to 11 months, and the [6:45] team got it down to 6 weeks. So, um that during this time they're going to be [6:50] making uh the the realignment there right below B um of Dry Creek Road and [6:57] as well as replacing um the section between that new [clears throat] [7:02] connection and Seaman's Gulch. Uh they're also going to be building a a [7:06] new temp road there where the yellow is during the six week closure. So, um a [7:11] lot of good realignment that's will be happening out there. Um, as a resident [7:15] that lives off in that general area, I've been visiting a lot with my [7:19] neighbors, so hearing a lot about this. But, um, the team has done a great job [7:23] of already coordinating with the school district. Uh, luckily the students here [7:28] um, [clears throat] mostly are part of the West School District, so they're not [7:32] needing to go into the elementary school that's in Hidden Springs. Um, there are [7:37] a couple, but they're they don't have any a couple houses that would [7:40] correspond to that, but they don't have any kids in Hidden Springs. So, um, so [7:45] really positive thing, uh, good progress here, but just wanted to report on on [7:50] this work. And all of this is part of that extraordinary impact fee, um, and [7:54] will be paid for as part of that process. [7:59] Uh, we also have a closure that's coming up um on Fairview Bridge. It's actually [8:04] happening today and part of tomorrow. It's it's really just a six-hour closure [8:08] in the middle of the day and possibly part of in tomorrow. Um, this is a [8:12] bridge inspection that that has to happen um and is scheduled about a year [8:18] in advance and so we were not able to to move it. Um, but it's only going to [8:23] close it down to two lanes going uh eastbound there. Uh, it doesn't close [8:29] the the bridge completely. We probably would have been a little bit more [8:32] concerned recognizing we already have uh with the sewer work that's happening for [8:38] the um College of Western Idaho construction that's happening at at [8:42] Whitewater and Fair or Maine. um that intersections closed at Whitewater and [8:48] Maine. And so uh probably would have been a bigger deal had um it been a full [8:54] closure of the bridge, but we do have to get that inspection done in order to [8:58] stay in full compliance with with federal rules. Um and in order to do [9:02] that, they have to put something on the bridge. So um but this is this is up and [9:07] coming um today as well as tomorrow but should hopefully we won't have see any [9:12] impacts but because it is impacting one of the route ingress routes into [9:16] downtown wanted to make sure that you are all aware of that. [9:27] Hi CJ Hancock. I'm a lead worker here at the paint striping and pavement [music] [9:32] marking crew at ACD. I've been here for 10 years. So, the way that I ended up [9:38] here on the paint crew was I actually had [music] some prior experience in [9:43] Southern California. I was in the union there and when I moved here to Idaho [9:49] [music] in 2016, I ended up applying for the job and got hired [music] full-time. [9:55] When I first started here at ACD, I was a GEO, a general equipment operator, [9:59] [music] and over the years, I worked my way up to a senior equipment operator, [10:03] and then later becoming a lead worker. As a lead worker here, I help manage and [10:10] supervise a group of [music] about 20 people in our busy season. The average [10:15] day that we have consists of a lot of [music] striping. We stripe the entire [10:19] county every year. We repaint and restripe pretty much everything with [10:24] either the stencil trucks or the paint trucks. And then all the new install [10:28] goes in with thermal plastic after the chip seal or whenever [music] we have [10:32] work orders or changes. So during the chip seal season, um it's it's the [10:37] busiest time of the year. We have to start at 3:00 in the morning to [10:41] basically get all of the mains done before all the early morning commutes [10:46] start. It kind of just keeps us out of the way of the public so that we're not [10:50] causing more congestion. We try our best to stay out of traffic's way and to keep [10:55] a mobile operation that keeps traffic flowing with as minimal disruptions as [11:00] possible. I think that my favorite part of the job is seeing the completed work. [11:06] Nothing really feels better than when you have pretty much a black canvas and [11:10] you get to just be an artist and [music] make everything look new again. And we [11:14] have a great team. I love the people I've worked [music] with. I've been [11:17] working with them for a long time. I think the hardest part of the job is [11:20] probably training. We [music] have a lot of seasonal employees, a lot of new [11:25] traffic rovers that come and go, and just having safety [music] being our top [11:29] priority, just having everybody stay on the same page and in the way that we do [11:34] things. So, outside of work, I like to play a lot of sports. I play actively [11:39] basketball, volleyball, flag football, cornhole leagues, kickball leagues. [11:45] Pretty much [music] anything that you could think of, I'm out there doing it. [11:49] Keep my kids involved. Go paddle boarding, hit the water, staying busy, [11:54] staying active. Those are probably some of my favorite things to do outside of [11:58] work. [12:01] Commissioner CJ is really a great example of ACD and has always impressed [12:06] me. From my very first meeting with him, he was talking about ways we could make [12:10] things more efficient and more effective. It's truly a good example. [12:15] Um, and it's apppropo. Last night I had the opportunity, not last night, the [12:19] night. Well, I've kind of lost track because I got up at 2 in the morning [12:23] yesterday uh to go out with our paint crew. Uh truly a wonderful team. We were [12:29] able to um uh prepare and and get it set up as well as then mark out um the [12:35] intersection of Locust Grove and Pine. It was one of the last ones um they had [12:41] from Chip Seal to of the larger intersections and the whole crew was out [12:45] there uh making those changes. I'll tell you it definitely impressed me um as you [12:52] have cars whizzing by at 30 40 mph. I watched a dump truck go by or or a [12:58] garbage truck go by. I'm sitting here going, "Did you not see the 50,000 cones [13:02] we have out here?" Um, so truly they they they are focused on safety and [13:06] making sure because they are in the middle of traffic in some of the busiest [13:09] intersections. We even identified maybe some ways to make that even safer while [13:13] we were out there. So, it was a really great um opportunity. But, uh, as I went [13:18] to bed the night before at at 6:00 at night, I realized the sacrifices, um, [13:24] these guys make as I'm saying good night to my family and I'm going to bed while [13:28] they're going to still be up for many hours and and the sacrifices they make [13:32] during the summer in order to do the job and to make sure that, um, they're safe [13:37] as well as the public continues to to move. So, uh, great experience there. [13:42] Uh, just a couple statistics on our our paint crew. uh just in July and August [13:47] alone they striped over 1,100 miles um and installed in in August alone 1,800 [13:55] pavement markings which is a 55% increase over last year um just just [14:01] tremendous amounts of work the team is doing very well um and continuing to [14:06] make it you know for me I told them it's a sense of pride when I drive around and [14:10] I see the brand new paint on the road I'm like look at what they did look at [14:14] what our guys are doing and it just shows up somehow in the middle of the [14:17] night. You never you never actually see it happening. They're just doing it. So, [14:21] um kudos to to them for that great um for the great work they're doing. [14:27] A couple of agenda items that are up and coming. Um uh we will have next week for [14:33] you. Today you'll hear about the 5-year plan. Next week we'll have the bid award [14:37] for the Eert Bridges and Roundabout. Um, as you may have seen from the the report [14:42] that we sent out, um, it came in well under, um, our initial estimates. So, [14:48] uh, really pleased with that. Um, as that's moving forward, we'll also have a [14:52] a work session on micro trenching, um, with the 5-year plan adoption later this [14:57] month. Uh in October, we'll be bringing back to the second phase of our slow [15:02] zone pilot program um with where we're looking at the central bench for a slow [15:07] zone. Um and and our team will introduce that and what we're looking at doing [15:12] there um in and around some of the schools up on the bench. Um as well as [15:16] we'll be bringing back the next iteration of our our development policy [15:20] um for consideration and conversation. Uh commissioners, you can see obviously [15:26] a lot of things are up and coming. Uh next week we will have our all staff on [15:31] Tuesday at the Adams broom shed. Um this will likely be one of our last at the at [15:36] Adams. So um as we get ready um next year to move into the new location [15:44] um as well as we will have the chipsil celebration. You'll also see a number of [15:48] open houses and open streets events and other public events that are up and [15:52] coming. And with that, commissioners, I'm happy to stand for any questions. [15:58] » Commissioner Gold. >> Yes. Uh, so I I watched CJ [16:04] sprinkling all the uh beads down so that everyone would be able to see those uh [16:10] stripings while we while it rains or any chance that that he was the guy on [16:18] with the little canister of beads on a skateboard being dragged behind one of [16:24] the paint trucks that did the regular striping. I'm just kidding here. [16:28] [laughter] I think our trucks actually do that. [16:31] » The trucks do that. >> Yeah, they right right behind the paint [16:34] there's there's beads that are falling. Um and so yeah, the our our our paint [16:39] our striper trucks do lay the the glass. >> Take a little video of that to show [16:44] people that, you know, email us and call in and complain that we don't do any of [16:48] that. [laughter] >> I I'm sure we have some good video of it [16:52] already, but uh um it's a good point. >> Madam President, [16:57] » Mr. McKenny. >> Uh, director, just one quick question [16:59] then on on the striping issue. I've had a number of residents who have uh asked [17:05] questions or expressed concerns about places where they believe after chip [17:09] seal that crosswalks weren't put back in. Who do they need to contact to uh if [17:14] they have that concern? >> Yeah, they absolutely can just reach out [17:18] through ACD Connect and that will get it to the right people um and we'll be able [17:23] to confirm that for them. Madam President, Commissioner, [17:28] » and there may be Sorry, Madame President. Um there will be uh they're [17:34] still working on the markings, so they're not fully done for wi with all [17:38] of those and so some of those may still be in the works. [17:42] » Sure. >> Pickering. [17:44] Um, director Head, I don't mean to ask a question you're not may maybe not [17:50] prepared to answer um because it's kind of ITD2, but there's been a lot of uh [17:56] challenges with congestion at peak hour leaving downtown on Front. Um, obviously [18:04] there's we've got the closure on Fair View, a few other pieces. Front Street [18:09] is not our jurisdiction, but it's pretty challenging. I was just curious, do we [18:16] have an assessment of what exactly is going wrong there? Are we working to fix [18:21] that flow a little bit better? Kind of what's your what's the team's assessment [18:25] of that? >> Madame President, Commissioner [18:27] Pickering, I think your your analysis is probably um appropriate in terms of the [18:33] impact of having that closure. um it is pushing traffic onto whether it be State [18:39] Street or or front um for people trying to exit downtown. So um I will [18:44] definitely ask to the team to to look at that to make sure that there's um [18:49] nothing that's that's um wrong with the equipment um and making sure that the [18:56] signal timing is appropriate, but it may not be. We are already um pretty maxed [19:01] out. We have double cycles on on Front Street to for for the through traffic. [19:06] Um and so I think any additional traffic's probably being noticed um with [19:12] the people being pushed off of Fairview. >> Well, I noticed Oh, sorry. I I also [19:16] noticed that it, you know, got considerable considerably worse, you [19:21] know, around start of school time because I think if I think it closed a [19:25] few weeks before, right around so it really hasn't gotten as bad up until [19:30] recently. And so I'm just wondering if >> what's changed [19:35] » um you know is it truly Yeah. And it's also backing up on 13th. So there's I [19:40] mean even the corridors to get to front are taking you know 10 15 minutes to get [19:46] to through one light cycle. >> Yeah. Madame President, Commissioner [19:49] Pickering, one of the things that changed in the last few weeks is they [19:52] the closure moved from between 27th and and Whitewater to in the intersection. [19:59] So those who would have used white water to to get onto the connector um [20:04] previously are now being forced onto roads like like 13th Street um to be [20:11] able to get on the connector sooner. So um that's I think a big part of what you [20:16] might be seeing there. They're either there or on onto Curtis. Those are the [20:19] two options to get there. Um and I think that that's pro probably what you're [20:23] seeing. But we'll uh we'll take a look. It might be worth I mean I know [20:27] Shandandy you have enough on your plate but from a communication standpoint and [20:30] also working with the city to make sure that folks kind of understand because [20:34] I'm seeing a lot of you know frustration and people care right and it's coming [20:38] out in I think very loud ways um but I think just kind of being clear about [20:44] this is a system we don't have control over we only have control over certain [20:47] parts of that right and we need to work together to figure that out. Thank you [20:54] Nelson. Yeah, I uh took me about a half hour to get through downtown last week [20:59] and uh I was wondering if we could um maybe have Compass at the appropriate [21:05] time give us an update on the congestion management system report that they do [21:10] every year >> to see where we're seeing recurrent [21:13] congestion and then what what's the trends? I've been really kind of curious [21:17] about that. So, there's a good time that someone there could come at a maybe a [21:21] work session at some point and give us an update. Um I'm very patient person I [21:27] guess but [laughter] uh I was really curious on with the [21:31] growth particularly in downtown and other parts of the county are there um [21:36] what can we expect in terms of recurrent congestion would be good to share. [21:42] » Yeah. >> Yeah. [21:45] » Any other questions or comments for the director? [21:48] All right. Thanks for a great report and we will be at ease until noon. [21:56] 11. [32:10] » [laughter] >> What the hell [32:16] radiation or chemo. >> Yeah. [32:18] » All right. Good afternoon everybody. It's now 12:00 and I will call the [32:22] commission meeting to order. Thanks to everybody joining us in person and [32:26] online and please join us in the pledge of allegiance. [32:33] » I aliance of the United States of America to the [32:39] stands and under God, indivisible, with liberty [32:44] and [32:49] » All right, the first item is to adopt the agenda. Is there a motion? [32:52] » So moved. >> Second. [32:55] » All right, we have a motion. >> He wasn't. So, [32:57] » is there any discussion? >> Seeing none, all in favor? [33:01] » I Okay, motion carries. Next up is the consent agenda. Items on the consent [33:05] agenda are considered to be to be routine and will be enacted by one [33:09] motion. There will be no separate discussion on these items unless a [33:13] commissioner citizens so requests in which case the item will be removed from [33:16] the consent agenda and placed on the regular agenda. All consent agenda items [33:20] are commission action items unless noted. I don't believe we have any [33:23] requests on the consent consent agenda today. Do we have a motion? Madam [33:28] President, >> Commissioner McKenna, [33:29] » let me first note that this is a long consent agenda, longer than typical, but [33:34] I believe most of it has to do with the fact that we recently passed a new [33:37] budget and so a whole bunch of things are happening right now because of that. [33:41] So, I've looked through all of these and it all looks in good order. I move that [33:46] we approve the consent agenda as published. [33:49] » I'll second. >> We've got a motion and a second. Is [33:51] there any discussion? Seeing none, all in favor? I [33:56] » any opposed? Motion carries. All right, that moves us to the regular agenda. Uh, [34:01] first up is a presentation of ACD team for National Equipment Rodeo [34:05] presentation by Lloyd Carnegie. Right. Oh, and Tom. [34:14] » Good afternoon, Madam President, commissioners. I am very proud to tell [34:17] you the winners of our local truck rodeo that we will be sending to the National [34:21] Rodeo in Colorado this year. We'll start out with our truck horse winners. We've [34:25] got Cody Shields and Dylan Roberts. Please come on down. [34:38] Our loader course winner was Cody Jensen. [34:47] Greater course winner was Justin Cedic. [34:54] And although he is not here, our skid steer course winner was Pete Ramp. [35:02] » And accompanying them on this wonderful trip to Colorado is Justin Starky, our [35:06] supervisor extraordinaire. [35:19] Commissioner Goldarp. >> Yes. I I I just noticed I I was hoping [35:24] that you weren't going to be announcing that they won something already besides [35:28] at our rodeo, but I will donate to the cause my sash [35:35] and we will put rodeo. Forget the other word, but what queen? [35:42] Okay. Anyway, if you don't come back with at least one first place, someone's [35:46] going to have to wear this thing. [35:54] » Yeah. Shall we do a shall we do a picture? [35:58] » Okay, we're gonna run down there real quick and do a picture with y'all. [36:02] » Hey, I'm not wearing this for that. [laughter] [36:11] The light's a little [36:36] » congregation. [36:45] Little bit of frozen. [38:06] Well, congratulations to that group. I know they'll do a great job at competing [38:10] and representing ACD in Colorado. Um that moves us to item number two on the [38:15] regular agenda which is authorization order of condemnation um 2026 arterial [38:20] and collector capital maintenance popular street coal road to Curtis Road [38:24] project number 52419.007 [38:30] parcel and property owner 7250 popular street owner LLC [38:36] and welcome Dave Sar. Thank you, Madame President. [38:39] Commissioners, for the record, David Sdar, rightway super. Oh, sorry. [38:44] » Sorry. This is a public hearing which I will go ahead and open. [38:47] Back to you. >> Sorry, I jumped the gun there. Thank [38:52] you, Madame President, commissioners, for the record, David Sdar, rightway [38:56] supervisor for the Ada County Highway District. [39:00] This is a condemnation dis uh public hearing and decision briefing uh for a [39:07] property on a residential capital maintenance project. Uh it's actually on [39:11] the Popular Street portion of that. Uh the owners of the property are 7250 [39:17] Popular Street owners. They named it after their address. Um, this project is [39:23] part of ACD's adopted 2026 to 2030 5-year plan. Construction is scheduled [39:30] to begin in fiscal year 27. This side, this vicinity map shows the [39:38] location of the acquisition. You can see Cole Road over there on the west side of [39:45] the acquisition. Uh, our acquisition is just on the north side of Popular [39:50] Street, about one or two properties in from Cole Road. [39:57] Here is a a closer zoom in of the property. Uh, in this case, the [40:04] acquisition is a temporary construction easement. [40:10] The property size before the acquisition is 2.470 acres. That property size [40:16] remains the same because this is only a temporary acquisition. The temporary [40:22] construction easement is 2,121 square ft. The property is zoned as [40:29] residential urban or a multifamily residential. [40:35] The offer package was sent in July of 2025. [40:40] Um we have had ongoing negotiations with the property owner and if the and in [40:46] August of this year staff ACD staff both legal and rightway has been in contact [40:53] constant contact with the uh property owners legal council. We are close to a [40:59] resolution. However, due to the project timelines we need to move forward with [41:04] the condemnation. It is staff recommendation that the [41:09] commission declare that the acquisition area as necessary for the project as [41:14] rightway and public use. Authorize staff to proceed with the condemnation action. [41:20] Execute an order of condemnation for the acquisition area. As always, ACD staff [41:26] will continue to negotiate to a resolution before a court case is filed. [41:31] I will remain standing for any questions. I think Commissioner Goldard. [41:36] » Yes. Now, we're not taking anything fee simple on [41:41] this. How is the use of the property going to be changed with um this [41:46] project? [41:50] Madame uh Madame President, Commissioner Goldthorp, [41:54] uh the use of the property is going to remain mostly the same. Um, this is [42:01] actually this acquisition is just temporary to get the driveways correct. [42:07] Uh, so they are uh ADA compliant. >> Well, I I'm kind of amazed. [42:14] This is just me personally speaking for me myself and I I'm just amazed that [42:20] we're having to go to this extreme just to get permission to to do something [42:26] this temporary to spend this kind of time and money and goodness knows what [42:32] else just to do a little thing like this. I [42:37] I hope they know that uh that they're really wasting the public's [42:44] resources and dragging their heels like this. [42:49] Madame President, Commissioner Gothorp, I I understand uh all I can say is that [42:55] we're definitely working with their parties and we we we anticipate a [43:00] resolution soon. So, I don't think it's going to go to the bigger cost. But [43:04] thanks. You never know. >> Any other questions for staff on this? [43:11] Okay, seeing none, are there any members of the public present or online who wish [43:16] to uh testify on this item? [43:23] All right. Seeing none, I will close the public hearing. And this is before the [43:27] commission. and President >> Commissioner McKini. [43:30] » I move that we approve the authorization order of condemnation for the 2026 [43:36] arterial and collector capital of maintenance popular street co to Curtis [43:39] Road project number 524019004 parcel 6 property owner 7250 Popular [43:46] Street Owner LLC. >> I'll second that. [43:49] » Okay, there's a motion and a second. Is there any discussion? [43:52] Seeing none, all in favor. >> Any opposed? Motion carries. [43:58] All right, moves us to discussion items in public communications. Is there [44:02] anyone in person or online who wish to address the commission? [44:07] Okay, seeing none, the meeting is adjourned. We do have a work session. [44:11] We're going to move next door to the commission boardroom for this work [44:13] session. So, we will be back up over there in a minute. [46:18] Um for today's presentation, uh staff would like to go over uh the updated [46:24] schedule as well as the public outreach done so far, including the results of [46:28] the second public outreach. Um we will uh we will present uh on what has been [46:36] uh updated to the partner agencies as part of their this second partner agency [46:40] outreach uh and the recommended changes following that initial draft release and [46:46] finally next steps. Um just as a reminder commission we like [46:52] to present the updated schedule for this uh development of the plan. Um we [46:57] highlighted in red the this month where where we are in with the review of the [47:03] public and partner agency common review work session and this will all lead into [47:09] the September 23rd uh 5-year plan adoption hearing. [47:17] So on August uh following the commission meeting uh the August 5th commission [47:22] work session staff released the initial draft to the public on August 6 and to [47:28] the partner agencies. uh for the public the comment period was [47:32] open from uh August 6 to August 20th for a two-week period where we receive a [47:38] total of 431 public comments between all platforms [47:44] um and a total of six 6,600 views in in the project engage page. Of those 431 [47:52] public comments, 378 were received through the interactive comment map, [47:58] 33 through the engage page survey, and 20 comments via email and ACDC connect. [48:05] Um, in as part of this slide, we wanted to highlight some of the most commented [48:08] projects as as listed there. The most commented project was the Warm Springs [48:13] and Milbrook project with 28 responses. Uh in this slide we also included the uh [48:19] uh the degree of support that the project received uh and as well for the [48:26] other five projects in there. Um under the most commented projects, we [48:32] highlighted the top themes from the public from all interactions. Uh with [48:38] the top theme being concerned over keeping up with growth and the [48:42] development areas as well as the request to accelerate many of the projects that [48:46] are already in the plant and plans that yet to be identified as well that are [48:52] identified but are lives in the Byon 2031 tab. then uh uh continue to be uh [49:00] receiving support for safe route to school projects and pedestrian bicycle [49:04] safety project all across the board uh throughout the county. [49:09] Um with that commission of uh in total from the 378 commented project 80% of [49:16] the comments were supportive of the projects listed in the plan 5% uh [49:21] received neutral comments uh and 15% received no support. [49:30] Moving forward to the partner agency outreach. Uh as mentioned in our uh last [49:35] work session commission, we reach out to all our partners presenting uh providing [49:40] them an update on their project prioritization list. Following our uh [49:45] the updated or the draft initial draft of the five-year with those updated [49:50] statuses as well staff invited uh partner agencies if there were uh [49:56] interesting of meetings or any had any questions regarding any any of their [49:59] list. Uh we were more than happy to to meet with them. Um one uh the city of [50:06] Maria invited staff to attend one council meeting and city of voice [50:10] invited at a staff level uh meeting to discuss some of the projects listed in [50:14] the p participation list. Uh this slide we highlighted what uh some of the we [50:21] highlight we summarized the project program in relations to their top three [50:25] uh projects listed in the prioritization list with 37 of those projects having a [50:30] construction year associated with them and 15 of those projects having at least [50:35] one of the phases whether it's design or right or rightway acquisition phase [50:38] listed in one in in in there in the prior decision list. [50:45] And sorry, just to note, and I didn't know if you were going to mention this, [50:48] the we did receive a letter of support um from Ada County and in response to [50:54] the draft plan just indicating their gratitude for the work of the [50:58] recognition of the work that's happening >> and the projects that we are doing for [51:02] them. >> Yes, absolutely. [51:09] Now move forward to the recommended changes following the initial draft [51:13] commission. After uh the review of all the feedback received um in uh further [51:20] review of the initial draft uh staff recommends that uh identified that the [51:25] Boisey Hill Drive 7th Street Mesa Grande Lane be added to the initial draft and [51:30] add construction to 2029. uh this is a project that uh in the past [51:36] it uh it was identified as an RPI project but was deemed that it needed to [51:40] be more uh from the capital side. So we move it into the plan due to uh that [51:47] evaluation consideration. Um then uh another addition or modification to the [51:53] plan which was already part of the priority quarter list is the addition of [51:57] a design year to the lake hesil uh extension. Considering that city of [52:04] Boyise uh received a bill grant for that work, we ACDA is supporting those those [52:09] efforts uh and considered that uh it was necessary to start uh showing those [52:16] dates or those years in deadline. >> Um let's go back to that for a second. I [52:22] I believe we've talked about in the past this build grant that the city of Boise [52:26] received, but I don't recall the details. Could you review that for me? [52:30] What did what did Boyisey receive? Is it just for design? [52:33] Madam, give me the rundown on that. >> Madam President, Commissioner McKini. [52:37] Absolutely. Uh the bill grant um that the city received was focused on the [52:42] design work for the Lake Heso extension from Orchard Street to Heisenment. Uh [52:47] this focuses solely on the on the on the on the 100% design needed for that [52:55] border. Um I think as part of that brand AC committed to a certain match that was [53:01] discussed earlier this year but those are the details that were present [53:07] » sorry I thought it was more of like a concept like theoretic was design [53:12] » they can add some elaboration to that madam president commissioners so they [53:17] will need to go through the initial concept um alignment um because it's a [53:22] federal grant there'll also be NEPA and other other components connected to that [53:26] um the intent is to take it to um as far in the design process as possible within [53:32] the 7 million that they receive 7 million with the match combined. Um and [53:38] so with that they plan to take it as far as possible in the design process. Um it [53:43] should be at that point in time um fairly far along that we could begin the [53:47] rideway phase um and move further with the project. [53:52] » Members, go ahead. And since is did we receive any other recommended [53:56] recommended changes from other city partners? [54:00] » Uh the from conversation with staff most of the uh [54:06] short answer is no. There was no specific additions to the initial draft. [54:10] Most of uh of the conversation was related to their uh prioritization list [54:15] request. For example, city boy requested the addition of uh LA and Alpine [54:21] intersection in terms of prioritization of this. We're [54:24] » um considering the work that they have done in that area, but beyond that [54:28] project, there hasn't been any other specific that would be recommended to be [54:34] added the initial draft >> that would include Garden City or [54:37] Meridian. Commission. Well, [54:41] » Alex has pretty much covered what I was going to ask. [54:46] » [clears throat] [54:50] » Now entering to the key dates and milestone commission. Uh we still uh [54:55] have a comment per partner agency all the way to the adoption hearing. Welcome [55:00] any feedback letter of recommendation from them. uh and uh [55:07] we will share it with the commission as soon as we have received any uh line of [55:12] communication from the from any of the partner agencies. Um following today's [55:17] meeting, we'll be releasing the draft 27 2031 5-year plan for public review uh in [55:24] preparation in leading towards the adoption hearing on September 23rd when [55:28] the commission will be able to uh take it under consideration. So, uh, with [55:34] that, I will I present for any questions. [55:38] » Thank you, Edmonson. Are there any other questions? Commissioner Nielson? [55:41] » Yeah. Um, Ed and I have lots of paper on the five-year plan, lots of project [55:47] list, but what I don't have, and you summarized it, so it must exist of which [55:51] projects are in design versus construction or what phase. I have [55:56] title, I have a description, I have a year, I have all but I don't have a [56:00] phase. So if there's some summary of that that can be posted. I I know it [56:05] exists but that's where I'm trying to ascertain the and some of them I just [56:09] know because I I designed but I I don't I can't see that [56:15] in what I have. So that summary could be provided and then the second question um [56:20] I don't recall the exact number it's very large but uh in approving the [56:24] budget we didn't approve specific projects but there was an amount. So, [56:27] are we with this change dialing in with the budget amount that was approved [56:35] » for the capital projects? Does that make sense? I mean, [56:38] » Madame [clears throat] President, Commissioner, um, with the cap with the [56:43] budget, you did adopt a capital budget. >> Yeah. [56:45] » Um, and that capital budget include included a list of projects that were [56:49] Okay. Um, that are currently scheduled for the first two years. The five-year [56:54] plan includes those first two years and then three more years after that. Um so [57:00] we we reflect exactly what was adopted in the in the budget in the five-year [57:05] plan um in those first two years. >> Just a followup, Madam President. So [57:11] with the savings on eert, for example, is that going to be a future [57:14] recommendation or are we just going to wait and see? Um [57:18] » yeah, Madame President, Commissioner, um we we typically will look uh account for [57:24] those during um budget adjustments. >> Yeah. [57:27] » And the the good news and the bad news on on Eert is with those savings, a lot [57:33] of those are grant funds that are going to be saved. So, um those those right [57:38] those funds don't necessarily come back to us. They're but so there'll be a [57:42] reduction in revenue as well as an expense. [57:45] » Thanks for that reminder. Yeah, opportunist [57:50] » just more of a comment and I think it's really [57:54] great to see how one obviously like a letter from the county. We've never [58:00] since I've been here haven't received something like that in support for the [58:05] five-year plan. And then also to have such small change. I mean, these are [58:11] obviously very impactful changes, but they're kind of no-brainers, right? [58:15] that's very like oh we just learned more this is going to be more capital we had [58:19] factored in this grant so I think that I just I feel like I feel compelled to [58:23] share like I think that that's obviously a reflection of the team's work and the [58:28] you know intention around centering priorities [58:32] working closely with our municipal and county partners um obviously no one's [58:37] ever it's never perfect or no process is perfect no one's 100% satisfied but some [58:42] of those projects folks were very happy with the fact that they were on her. So, [58:46] I just wanted to make sure that I acknowledge like the process and the [58:52] outputs and the outcomes seem to be working and great job. [58:57] Any other comments or questions? All right. Thank you so much, Robinson. [59:02] Appreciate it. Uh, next we will have executive session. So, [59:10] anybody else again next week?