[0:01] Um, second place, Jennifer. Is she not here? I guess not. Good job, Jennifer. [0:08] » Um, third place, um, was Equity Bank, Shelby Bannon. [0:14] » Y, congratulations. [0:20] » Thank you. [0:24] Congratulations to all of our winners and a huge thank you to everyone who [0:29] participated this year. Each arrangement I think added something special to our [0:34] downtown and we appreciate the time, creativity, and the care that went into [0:38] making our downtown beautiful. So, thank you very much. [0:41] » Thank you. I'll >> give this to Jennifer. [0:43] » Thank you, >> Connie. Thank you for all you do in your [0:45] position as go Augusta director doing a fantastic job and thank you for [0:50] participating every year most of you >> and I I just want to thank everybody [0:56] that had something to do with planting the pots because I couldn't have picked [1:01] a first or second place. They were all good this year. Really appreciate it. [1:09] Now, are there any visitors here that aren't here about something that's [1:13] already on the agenda? [1:18] Okay, we will move to our first item of [1:22] business, which is to conduct public hearings to [1:26] take public input and comments on the revenue neutral rate and the 2027 [1:31] proposed budget. And I'm going to uh I've got a little thing I want to read [1:40] first. [1:46] I I was thinking about this over the weekend and I just I wrote down some [1:50] things. I want to express that uh I hope you all [1:55] actually took time to read the budget as the narratives that are included in this [2:01] budget explain the why and hows for the proposed expenditures [2:07] and our staff and council members have spent several hours and the staff has [2:14] spent days and days going over this budget looking for the best outcomes to [2:19] keep the services that our public expects and to not be wasteful of our [2:25] tax dollars. And when I say our tax dollars, [2:29] we all live here in town and we all pay taxes, too. So, just remember, [2:36] we're thinking of everybody, including ourselves. [2:41] We have the we the council have reserved the option that after this public [2:45] hearing tonight that we might have another workshop next week to see if we [2:50] can adjust anything downward before say signing off on this budget. Uh we've [2:58] wrestled with this a couple times already, but maybe somebody tonight has [3:03] a better idea. And if you're going to speak tonight, [3:09] remember to be called on and then when you come up, state your name and your [3:15] address and then you'll be asked to keep your comments to five minutes or less. [3:21] So with that, I'm uh turning it over to staff for a presentation first. [3:28] Mayor and Council, as part of the presentation, uh what I'd like to walk [3:32] through first is just the process that is shown on the agenda. Um you had a a [3:38] new statute that went into place in the last couple of years. And so it's always [3:43] good to get a reminder because we don't do it very often, but explaining how the [3:47] uh new statute on the revenue neutral rate works. And so the process tonight [3:52] is um after we do our staff report presentation, we'll open the public [3:56] hearing to take public comment. and that is the public hearing on the revenue [4:00] neutral rate. Uh once we've taken all the public comments on that then we can [4:04] close the public hearing and there is a vote on the resolution. The resolution [4:09] is simply to exceed the revenue neutral rate which is what was published. You're [4:15] not specifying what budget you're adopting. You're not specifying what the [4:20] final amount is. you're specifying that you're planning to exceed, which was the [4:24] notice that went out to the county previously. Now, you still have the [4:28] ability uh once we get to the actual budget hearings to reduce the budget [4:34] from there, but you cannot exceed what was published. Uh but you do actually [4:39] have to take action on the resolution just saying that you plan to exceed the [4:43] revenue neutral rate. Um once that vote is taken, then you'll open the public [4:48] hearing on the budget itself and then take public comment, close that public [4:54] hearing and then you have the option to proceed with the budget tonight or as [4:59] you did last year and what was discussed during the budget work sessions was uh [5:03] potentially scheduling a follow-up session where you take the feedback uh [5:08] go back have a work session and discuss and then uh come back at the next [5:12] meeting and make your final vote. So that's the process that you followed [5:16] last year. Uh you don't necessarily have to follow that. You're able to proceed [5:20] with it tonight if you wish. But my recollection from the work sessions was [5:24] that the plan was to have one more session after this meeting, take the [5:29] public comments, and then have a final vote at the subsequent meeting. So uh if [5:35] there's no questions about process, then I'll go ahead and do staff's [5:39] presentation. Are you good with us moving to the presentation? [5:42] » Yeah. Okay, I will give the uh the presentation, provide everybody a [5:47] background of what's going on with the budget process, how the RNR stuff works, [5:51] and then once I'm done with the presentation, you can open the public [5:54] hearing and take public comment. [6:01] Okay. So, mayor and council, one of the the first things that we uh talk about [6:05] in the budget every year is assess valuation. And um I'm going to do this [6:10] uh this is for the benefit of anybody typically working or watching at home if [6:15] we can get the YouTube uh fixed. We will try to get this recorded. If not, all of [6:20] this is in the packet anyway and we'll be able to to showcase it um online if [6:25] we get the recording fixed and then also uh at a subsequent meeting if you choose [6:30] to have an additional work session. So the first thing is our assessed [6:34] valuation. Assessed valuation is essentially your tax base. how much of [6:38] the property in town is taxable. And this chart just shows you the amount [6:43] over time. So you can see back in the 2018 time period, we were about 57 [6:48] million. 57 million and some change. And in our most recent uh numbers from the [6:54] county, we're looking at a cess valuation of 90,530,000. [7:00] Um, compared to 2026, that number was 87,8 [7:07] sorry, 87,82,000. So, we had a valuation increase of about [7:13] 2.7 million, which overall was a valuation change of about 3.11%. [7:20] Now overall that's tracking at at least on what they're forecasting [7:25] right now that's tracking a little bit lower than what inflation was but 3.1% [7:31] is the current valuation change number. [7:38] Now the mill levy is the actual tax rate. So the previous slide was showing [7:44] you how much property is taxable in the city of Augusta. This slide tells you [7:48] what is the rate that is being taxed. Uh what was published for this hearing was [7:55] a proposed mill levy of 59209. Last year's mill levy was 58398. [8:04] And so the published mill levy is slightly higher about 081 [8:10] uh mills higher than last year's number. The revenue neutral rate is 56.298 [8:18] compared to the published rate for this budget of 59209. [8:25] Now in the subsequent slides we'll talk about what the difference is between [8:29] those two rates. [8:34] So this slide shows you the uh the property tax dollars. You have five [8:40] property tax supported funds. So those are the ones that mill levy that taxes [8:45] uh property taxes are assessed to. Um you can see the difference between 2026 [8:51] budget and the 2027 budget. And uh I believe that there's I think [8:58] there's a typo on that 2026 one. I apologize. Um the the change was [9:03] 248,000. I believe uh this was the 2026 budget [9:07] number until you made your changes at the hearing. It actually went down to [9:11] like 5.1 million. And I apologize. I thought I had that number updated in [9:16] this chart. The change was 248,848. [9:21] So you have an additional $248,000 of property taxes in the 2027 budget [9:28] that were not in the 2026 budget. And that is an overall increase of about [9:33] 4.87%. [9:38] and that includes um the new library position that was added. So this is [9:44] inclusive of that in terms of what was published for the hearing. [9:51] All right. So now we'll talk about the revenue neutral rate. So, this was [9:56] established by the legislature a few years back. And essentially what the [9:59] revenue neutral rate is, um, I'm going to read this definition and then maybe [10:04] try to give you a layman version of it. But the revenue neutral rate is the [10:09] property tax rate in mills that would generate the same property tax revenue [10:14] in dollars as levied during the previous tax year using the current tax year's [10:19] total assessed valuation. That sounds really complicated. Essentially, it's [10:24] just saying if you were generating last year's property taxes with this year's [10:30] assessed valuation, what would your mill levy be? That's what the revenue neutral [10:35] rate says. Um, it doesn't speak to inflation. It doesn't speak to cost. It [10:41] just speaks to if you were generating the same amount of property tax dollars [10:46] as last year with this year's tax base, what would the revenue neutral rate be? [10:58] Okay. So, the uh the 2026 levy versus the 2027 levy. And again, I am so sorry. [11:07] I may have a different version of this presentation elsewhere. I apologize. Um [11:14] the revenue neutral rate is 56.298. The uh the published levy [11:39] We'll use this one. The published levy was 59.209. [11:49] So this was the notice for the hearing. Here was the published levy. Here was [11:53] last year's levy. And then here is the revenue neutral rate 56.298. [12:17] So every year when we go through the budget process, you put together what's [12:22] called a budget adjustment list and everything that's included in the budget [12:27] that has a mill levy impact. So we include staffing, we include wages, if [12:33] you buy equipment, um anything that that has a [12:37] consequential uh mill levy impact, we put on the adjustment list. We had nine [12:42] potential adjustments that were included in the adjustment list this year. Uh for [12:47] the sake of the publication of the hearing, none of those were selected for [12:52] publication. Uh you still have the ability to consider them. You still have [12:56] the ability to reduce what was published. You just cannot legally [13:00] exceed what was published at this point. [13:06] Um, last year, as you recall, there was uh several positions that were added to [13:13] the public safety budget. This year's budget, the only position changes were a [13:19] library position that was requested and that was for the adult services desk [13:24] clerk position. Um, and then there was an explanation that was provided by the [13:30] library board and the executive director uh about the position request and that [13:36] was discussed at your work session and it was included in the budget and has [13:42] not been removed um as of the uh the work sessions or the publishing of the [13:47] public notice. Uh we do have library staff here if you have any questions or [13:52] want to speak to them. Again, again, a reminder, uh there's an explanation [13:56] that's provided up here on the screen. This was provided in the libraries [13:59] budget uh about the uh the staffing changes. Um so that was the only [14:06] position that was added last year. We had quite a few in the public safety. [14:10] This is the only position change in the 2027 budget. [14:21] Now on the uh the projects and initiatives, there was a lot of the [14:25] projects that are still carrying over that were stuff that we had started in [14:30] 2026. Some of it was in a design phase. Now you're moving into construction [14:35] phases. Uh some of them are just projects that spanned over multiple [14:39] years, but these are still the the top projects, initiatives, and priorities [14:43] are identified in the 2027 uh budget. The first one is the electric [14:49] volt electric low voltage system conversion project. Our staff is [14:54] currently working with the engineer to uh get all of the uh the design [14:58] engineering done so we can essentially bid that project out to move forward. Um [15:03] that is a a a massive electric uh grid project that is geared towards [15:12] reliability uh and sustainability of our system. [15:16] It's replacing a lot of outdated technology and a lot of um outdated [15:20] structures which is poles, transformers, uh substation that'll be replaced that [15:27] they're on a completely separate voltage system that does not match the rest of [15:31] our modern grid. Council approved a project previously [15:36] um for us to move forward with the electric voltage system conversion. So, [15:41] we're in that process and uh we're just in that design phase right now and the [15:46] construction is going to be going on through 2027 and and ultimately we'll [15:51] see when uh the project winds down, but uh for now it's going to be a pretty [15:56] long-term project for us to get done over the next year or two. The second [16:00] project is public works complex construction. You had essentially [16:04] authorized the uh the bonds for that a while back. We had done the first [16:10] building already this year which was the salt sand storage. You approved the the [16:16] bonds and the financing for us to move forward with that project. And actually [16:19] on the agenda tonight is uh one of the business items that approves the uh the [16:26] the essentially the the maximum guaranteed amount on that contract for [16:30] us to move forward with that project. Once that's done, then we can actually [16:35] begin the mobilization for construction. The red bud phase two uh you're [16:41] currently in a design uh process design engineering and this is for the bridge [16:47] over the river and then the uh the plan construction would happen later [16:53] potentially 2027 but I think stretching into the 2028 calendar year uh before [17:00] we're able to complete that that project. We're in the design phase right [17:04] now. Um, but you shouldn't expect that we'll be doing any sort of construction [17:09] before the end of this year if at best it's going to be happening in late 2027 [17:14] and then spilling potentially into 2028 depending on our conversations with Kate [17:19] Odd goes uh Santa Fe Lake OG wear and also the dam. So this is a project has [17:27] been hanging out there for about 10 years. You saw the pictures during our [17:31] budget work sessions where uh the current weir structure that holds the [17:38] water in the lake is falling apart. um it has crumbled the the concrete has [17:43] crumbled in the last you know 40 50 years that that uh new weir has been in [17:50] place and uh beyond that there are new standards that the division of water [17:57] resources requires us to upgrade both the spillway and the dam in order to [18:03] comply with modern dam standards. And so we are having to uh the the essentially [18:10] the scope of that project includes the addition of a stem wall and also uh um [18:17] earth work that will occur on the north side of the spillway and then [18:23] replacement in kind of the existing OG wear spillway. And then when that's [18:29] done, we will have resolved a a 10-year project that has been hanging out with [18:33] the Division of Water Resources and the and the um the Santa Fe Lake OG wear [18:40] will be able to move forward in construction in 2027. [18:45] The water tower rehabilitations, um I don't know that we're going to get [18:50] those done this year. I think we have our our KDH. [18:55] Um there is an inspection that's coming up this this fall and I don't think [19:01] we're going to have it ready to actually construct that this year. If we can, we [19:04] will proceed with it. And if we're not able to proceed this year, then that [19:08] will carry into 2027, but that'll uh update the Arnold Tower and then also uh [19:14] rehabilitation and work on uh golf that has issues as of the last inspection. [19:20] the CDBG sidewalk project. Uh that is not a guarantee right now, but the [19:25] council has gone through all of the process for us to apply for uh [19:30] essentially grant funding to help us rehabilitate sidewalks throughout the [19:35] community that fall in that that map area that we had done the surveys on and [19:39] show to the community. So, if we're able to secure that grant, then uh we could [19:44] potentially secure $1.5 million in funding to work on rehabilitation [19:49] sidewalks in our community. As you recall, the the community voted on a new [19:55] sales tax that included modified language to allow the sales tax to be [20:01] utilized for sidewalks and for streets. And so this will be the first time we've [20:05] had funding that's dedicated for that purpose for us to do rehabilitation on [20:10] existing sidewalks. And then the final uh substantive project is the CCIP. And [20:16] this is Highway 54400. Uh we secured a grant from KOT. I [20:22] believe it was a $400,000 grant for Ccl. And that is for the uh highway 400. And [20:29] I think it's from the overpass stretching west to the west city limits. [20:34] Um maybe just on the asphalt part. I I have [20:38] to check with the engineer to see where the full scope was, but it did it did [20:42] not include the bridge. The bridge is a separate issue that we're working with [20:46] KOD on. Um it is just the uh it is just the uh the asphalt I believe on 54400. [20:54] So those are the uh the major projects, the initiatives. Again, most of these [20:58] are just carryovers from last year, but they are large substantive projects [21:02] we've been working on for a very long time. And uh so we don't have a ton of [21:06] new things that we have added for the the 2027 [21:11] budget. So with that, mayor and council, I'm [21:14] just going to pull this up one more time. So this was the resolution that [21:19] was published last year's mil levy 58.398. [21:24] the proposed that was published for this meeting 59209 [21:30] and revenue neutral 56298. So, uh, from here on out, um, you open [21:38] the meeting. You, or sorry, you will open the the RNR hearing for public [21:43] comment and then once you're done with public comment, you can move on to a [21:49] vote to exceed the revenue neutral rate and then you will move into the public [21:56] hearing for the budget itself. So, with that, I'll turn it over to council if [22:01] you have any questions that I can answer before the the hearing takes place. If [22:05] not, you can move into the RNR hearing. >> Josh, I have a quick question. It's [22:09] about our technical difficulty. Are we able to go live yet? [22:14] » Okay. Thank you. Just for transparency. [22:21] » Okay. >> Let's open the public hearing. [22:28] So, if anybody here has something they want to say about the revenue neutral [22:31] rate, now is the time. [22:41] Okay, I don't see anybody stepping forward, so we'll close the public [22:45] hearing and I'll entertain a motion to uh get this revenue neutral rate vote [22:53] started. [22:57] Josh, uh, a yes vote means >> just that you plan to exceed the revenue [23:03] neutral. It doesn't it doesn't specify what the amount is, just that you plan [23:08] to exceed, which is also what you publish to the county already. [23:13] » I got that. >> And then it'll be finalized once you [23:15] actually vote on the budget. [23:20] » And so what you're exceeding is that 56.298, 298 which is just under just [23:27] under three ms higher than what was published [23:34] » or 3 ms sorry what was published is about 3 ms higher than the revenue [23:39] neutral [23:50] I hear a motion so If we vote to exceed it, [23:58] we don't have to pass it. We can go back and rework it to a lower rate, right? [24:02] » You're Yeah. So, the way And again, this this is one of the things that's kind of [24:06] goofy in the legislation, but you have to pass a resolution if [24:12] you're going to exceed the revenue neutral rate. And it says you have to [24:16] pass it essentially on the date of the hearing. And so you're not committing to [24:22] what the final mill levy is until you pass the budget. You're just saying that [24:27] you're planning to exceed the 56.298. >> Doesn't mean you have to either. [24:32] » So we can still come in. >> So if we [24:35] » if we could find a way to do it, >> you can still be lower, but you could [24:40] not be higher if you do not pass it. >> A vote yes does not indicate a plan to [24:45] exceed revenue neutral. It simply authorizes you [24:48] » to do that. Should your budget final decisions do that? [24:53] » It means you're going to >> The way it's worded is you intend to [24:55] exceed. >> That's what it means. [24:57] » But it doesn't mean you have to. >> What' you say, Mike? [25:00] » That's not what it means, Mike. >> Means you're going to exceed revenue [25:03] neutral rate if you vote yes for it. That's what it means. [25:06] » That's not correct. >> It means you plan on it, but that [25:10] doesn't mean you're necessarily going to do it. [25:13] » So, you're not required. >> You're not required to. [25:14] » We could hit revenue neutral still even though we say yes right now. [25:18] » Correct. or under. [25:24] » It's pretty confusing. >> It is. [25:27] » It is. >> It is. What? [25:29] » Confusing. >> They're saying it's confusing. It is. [25:32] » Yes. A yes vote does not bind you to exceeding your revenue neutral rate. Y [25:37] » correct. >> I think the journal [25:39] » allows you to say the general publicly assumes. [25:42] » I'm sorry. What was the answer? I I I [25:47] believe that it does. Um now it doesn't specify [25:54] what number that you're arriving at. Um if it's 59 58 57 56.3 [26:03] but I believe if you pass that motion then you are um saying you plan to [26:09] exceed the revenue neutral rate. It authorizes you to plan to, but it [26:14] doesn't bind you to >> Now, if you adopt 562981, [26:18] technically you exceeded it. >> You're still you're still pretty flat at [26:24] that point. But, >> but we hit 55. [26:27] » Huh? >> Can we hit 55? I mean, if we were able [26:29] to, are we allowed to do that even if we voted to exceed it? [26:36] » I don't know the answer to that. The way it's reading, it says that you still [26:39] find it after taking public testimony, you still find it necessary to exceed [26:44] the RNR rate. >> So, it indicates that you have every [26:47] intention of exceeding it, but >> I agree. [26:51] » It doesn't specify if you're bound to it. [26:56] » I I can't imagine >> if you don't adopt this, then you cannot [26:58] exact. That's the point. [27:00] » That is that is clear. >> That's the point. If we go into a public [27:05] comment on the budget and we are profoundly enlightened on other options [27:11] and we find ways to reduce the budget even below what revenue neutral maybe I [27:16] can't see that at the peak a statute would require us to pass something [27:20] higher >> spend more than we need to [27:26] » I want you to be right >> it's it's poss and again we've never had [27:30] that scenario before so it's I'm trying to think through it. Erica, can you help [27:36] me? Is it Is it possible then that if they did go below [27:41] revenue neutral that they would just pass another [27:45] resolution? >> If they if they publish it now [27:52] saying they plan to exceed, they can still they can still go below what was [27:57] published for the hearing, but not right revenue neutral. if they want to pass a [28:01] different resolution, >> you could either you could resend the [28:04] resolution. You could I mean you you wouldn't even have to do that because it [28:09] all it it's not binding you to a number. It's only saying you have the intent to [28:14] » um I can clarify that before the next meeting if if there's another work [28:17] session, but um that's never this it requires a ro roll call vote. [28:25] Um, so I mean again it's indicating that you have the in that you still feel it [28:29] is necessary to exceed it but it doesn't bind you to a number. So [28:35] » thank you. [28:39] » And I'm sorry that that that's confusing. What what Erica is reading [28:43] was essentially the the bullet point recommendations [28:47] that that are laid out for that statute and and what you were reading to me [28:51] earlier. It just says that >> it just says that um so the governing [28:56] body passes a resolution to exceed the RNR prior to adopting the budget, [29:01] records the roll call for the governing body vote, and then can formally adopt a [29:05] budget any time after the resolution is passed anytime within the time frame [29:08] they've set. Um but the resolution must be passed at the RNR hearing and before [29:13] the budget is adopted. >> Yeah. [29:14] » So it has to happen before the conversation about the proposed budget [29:18] itself. So that's why [29:25] » the city attorney have any opinion on that conversation? [29:32] » So I think I think you can if even if you pass this resolution you can pass a [29:37] budget lower or at the revenue neutral rate. [29:42] » Perfect. >> Thank you. What I need to know [30:04] that Kip just found something on the internet [30:09] and it says going lower, collecting less property tax revenue or [30:15] setting a lower mail levy than the calculated RNR is fully allowed. [30:21] Lowering the property tax collection does not trigger any special penalty or [30:27] extra hearing requirements. >> I think that's what that's what Andrew [30:33] just said. >> Yeah. [30:36] » Thank you, K. [30:41] I move for resolution number 2026-18 to exceed revenue neutral rate. [30:49] » A second. >> Okay, I've got a motion and a second. [30:53] Erica, will you call the role? >> Martin, [30:56] » no. >> Lick lighter. [30:58] » No. >> Bailey, [31:00] » yes. >> Scott, [31:02] » no. >> Richardson, [31:04] » yes. >> Davis, [31:06] » yes. >> Whitey, [31:07] » no. Martin, I'm sorry. Mar, >> yes. [31:17] » That's a tie. What it is >> doesn't have. It doesn't say. [31:46] I agree. Thanks a lot. [31:58] » We're We're trying to check the statute to see what the requirement is. So, [32:04] typically the mayor would have a tiebreaking vote. We're trying to verify [32:08] if that's actually what happens for a budget. We've never seen that before. [32:12] So, we have to check >> cuz the rules change on this stuff all [32:16] the time. [32:25] So, who are you going to fire? [32:36] That's all I need to know. [32:42] Okay, it does say majority vote. Um [32:50] 29 [33:17] All [33:29] right, mayor and council. So, it looks like the relative statutory reference is [33:34] KSA79-2988. [33:42] I'm going to read this. It says, [33:49] "A majority vote of the governing body by the adoption of a resolution or [33:52] ordinance to approve exceeding the revenue neutral rate shall be required [33:57] prior to adoption of a proposed budget that will result in a tax rate in excess [34:01] of the revenue neutral rate. Such vote of the governing body shall be conducted [34:06] at the public hearing and on the same day as the commencement of the public [34:10] hearing. After the governing body has heard from interested taxpayers and [34:14] shall be a roll call vote. If the governing body approves exceeding the [34:17] revenue neutral rate, the governing body shall not adopt a budget that results in [34:22] a tax rate in excess of its proposed tax rate as stated in the notice provided. [34:30] So I read that as a simple majority vote. Do does that give the mayor [34:37] Okay. So mayor, you have the ability to break is that what that says that the [34:41] mayor has the ability to break the tie. [34:51] » Okay. So in this uh mayor votes and breaks the [34:57] tie and you need a majority in order to pass. We'll [35:01] » call a Rawlings for your vote. >> Yes. [35:06] The motion carries >> again. So what that vote is is that it [35:11] exceeds or that you plan to exceed that uh revenue neutral rate of the 56. [35:17] Again, you have not adopted a budget yet, [35:21] » right? and you still have the ability to adjust it. [35:29] Okay. So, with that, we will open the public hearing for the [35:35] 2027 budget. And if you're here to speak about that, [35:41] you come up to the podium, state your name and address, [35:46] and give us your comments in five minutes or less. [36:07] Hey. Um, >> you'll have to speak loud. [36:11] » Okay. Um, Kobe Johnson. I live on 1426 Dearborn Street. Uh, I have a wife at [36:18] home and one daughter. Okay. >> Little baby under one year old. Uh, my [36:23] question, it's my first time, so excuse my ignorance here and you might have to [36:28] clarify some stuff. you already have. But just reviewing the budget, I saw the [36:33] rear loading trash trucks and you guys were originally planning to pay with [36:37] cash and saving up for that and then it got diverted into I think something [36:42] utility related, a solid waste facility. How do you guys plan to save for trash [36:48] trucks? And also, how do you source alternatives? I saw these listed 360 to [36:53] 400K. I did some quick searches and found two other cities had spent 260k on [37:01] standard kind of rear load trash trucks and I searched online and found on RDK [37:06] two 20 yard 25 yard trash trucks for about 260. So how do you source and make [37:12] sure that I don't want to use the word gouging but someone's giving you [37:15] competitive pricing on your your vendors? [37:19] » Fair question. [37:24] I I can answer that normally we do ask for competitive bids [37:30] unless we use there's a source that's a government approved source where the [37:36] federal or state government have already done the bidding [37:40] » and they list the people that are low bidders and that way you can just order [37:46] it right that way. Our staff [37:51] goes around and recommends the best truck that they see to fit our needs. [37:57] » Yeah. >> Um 20 years ago, we had rear loaders [38:01] that were single axle and uh we had two, if I remember right, we had two wrecks [38:07] with those on the landfill road because they weren't stable. So, we opted for [38:14] dual axle uh trucks to to maintain more stability. [38:19] Yeah, >> that that's just some knowledge that I [38:22] have. But >> did that answer any of your question? [38:25] » Answer a little bit. How do you plan to save for those trucks? And are you guys [38:29] planning to end up I know you said by 28, 2030, but you got to start saving [38:33] today. Do you guys start keeping reserves for that? And do you go into [38:37] like CDs? I know Kansas does allow you guys to invest and save money that way. [38:44] » Josh. >> All right. Um, so several things going [38:48] on there. So one, the utility is separate from the property taxes. So the [38:54] utility is the closest thing that we have to a business. It's considered an [38:57] enterprise fund. So with each of those essentially means that we have customers [39:02] that we charge a utility rate for and then the rates pay for the operations. [39:07] Now in solid waste you have another project that is kind of unrelated to the [39:14] fleet which is the public works complex. And the public works complex is a [39:19] combination of buildings. Some of it is for the utility, some of it is for taxup [39:23] supported operations like the street crews and the parks team. um the utility [39:29] for solid waste is going to be contributing some of the money for the [39:33] project and then the rest of it was bond finance meaning that it has a property [39:38] tax impact. The way that we handled that in the budget over the last couple years [39:43] was to make it a neutral property tax impact by reducing something else by the [39:48] equivalent amount. So that's how we handled the building infrastructure. [39:53] Now that still leaves the trucks which are funded by the utility. Uh we have [40:00] replaced two of the um we have two different types of trucks. We have [40:06] automated which are uh sidearm loaders. And then we have the standard rear [40:12] loaders which are the the commercial boxers. You see the 2 yard, the four [40:16] yard, the sixyard. And they serve different purposes and they handle [40:19] different types of equipment. We have replaced the two um automated side [40:27] loaders already with cash and we were able to save that up over the last 10 [40:32] years to pay cash for that which is one of the goals that the council [40:35] established. Um in recent years though the truck costs have gone up [40:41] considerably. We also got hit with tariff pricing. That was one of the [40:45] things our vendor told us uh that those trucks were going up based on that sort [40:50] of pricing as well. And so the cost of the rear loaders is what's left. Um the [40:56] conversation we had with council at the work sessions was if the goal is to [41:01] still pay cash and buy those outright without issuing debt. We think you have [41:08] to do a a rate increase of some kind if that remains the goal. You don't have to [41:14] buy cash. That was just one of the goals. If we're willing to finance it [41:18] and spread the costs out, we could potentially manage that differently. But [41:22] if we're trying to get enough cash to buy it outright, uh we're likely going [41:26] to be looking at a rate increase towards the end of this year going into next [41:31] year. As the mayor indicated, there are different truck types. Um there's [41:36] different axles, there's different engine setups. Some of them have an [41:39] engine in front, some of them it's a cab over where they're and those are [41:43] differently priced. And um I don't know that I can answer all all the questions [41:49] about which types of trucks uh we're all looking at, but um we have evaluated the [41:55] fleet. We did test runs with a variety of different equipment and price is not [42:01] the exclusive thing that we look at. It's an important thing that we look at, [42:05] but we also have done demos and things to make sure that it's the best piece of [42:10] equipment for our purpose. So sometimes we're looking at the long-term [42:14] maintenance cost. Sometimes we're looking at uh you know in the example of [42:18] the cabover chassis versus the one where the engine is in front, the ability to [42:23] navigate in some of our alleys, the ability to make turns and culde-sacs, [42:27] one of them is better than the other. So some of that goes into the choice as [42:31] well. And then what the mayor was speaking to is some of the equipment we [42:35] buy, not all the time, but some of it we buy through something called a n a [42:40] national purchasing contract. So there's a solicitation that is done on a [42:45] national level with vendors across the country where they look at pricing and [42:49] then they look at all of the other um criteria that they may establish for [42:55] engines for maintenance and otherwise. And we're able to piggyback on those [43:00] contracts. So that's an option. Uh you don't always end up with the cheaper [43:05] equipment. Sometimes you do, sometimes you don't. It depends on which contract [43:08] we participate in. Um, so we'll ultimately we'll have to choose what [43:15] trucks we get. I don't think we've chosen at this point, but that's that's [43:20] some of the logic that goes into it and what the plan is right now. So, we've [43:23] replaced half the fleet with cash right now, but we have two more and we've got [43:28] to figure out how to pay for them. And if the goal is pay cash, then we we're [43:33] looking at a a rate increase. >> So, when you save, do you put into CDs? [43:38] Do you do any kind of accumulation or investing on our reserves? Do we have [43:42] any? >> Yeah. So, uh there's something called [43:45] the the municipal investment pool and we participate in that and uh that is [43:51] invested in in different ways. Um so, yeah, we we have a couple of things like [43:56] that where money goes into it and you're able to generate a little off of it. [44:00] That's been better the last couple of years. In prior years, it generated very [44:04] little for us. Um, but recently we were able to get a little bit more out of it. [44:10] » All right. Thank you. >> Thank you. [44:13] » Thank you, >> Cody. I just like to say thanks for [44:17] coming to our meeting and asking questions and things. We appreciate [44:21] that. >> Yeah, [44:22] » I echo that. >> Come back anytime. [44:29] » Is there anybody else? [44:34] Okay, let's close the public hearing and consider approval of the proposed 2027 [44:40] budget. Or we have an option that we could just table it because we're going [44:45] to go to a workshop possibly. So that's your choice, council. Mr. [44:50] Mayor, I make a motion to to uh table the approval of the 2027 budget, [44:54] schedule work session review, discuss potential reductions or changes to the [44:58] proposed 2027 budget. >> Second. [45:00] » Second. Got a motion and a second. Are there any other questions? [45:10] » Okay. >> Now, can we schedule [45:14] » the official work session then? And >> well, can I vote on the motion and then [45:19] schedule the work session? >> Do both in one? [45:23] » Yes. If we haven't done that. Yes. >> Yes. [45:28] » Okay. All those in favor say I. I. >> Any opposed? [45:32] » Motion carries. Do you plan on is it next Monday night [45:38] you want to do the work session? >> The off Mondays are typically when [45:41] you've had them. Uh 21st you have to adopt the budget before our deadline. So [45:46] I think sometime next week is your only opportunity. The off Monday makes the [45:50] most sense based on your previous schedules. [45:53] » Okay. 5:30. Josh, >> it works for me. [45:58] 21st >> 14th. [46:01] So may >> I make a motion to schedule the uh [46:04] hearing I'm sorry the the meeting to discuss the potential reductions changes [46:10] on Monday September 14th at 5:30 p.m. here at council chambers. [46:16] » Second. >> Got a motion and a second. [46:19] » All those in favor say I. >> I. [46:22] » Any opposed? Motion carries. Thank you. [46:27] » 14th to 14. >> Okay. [46:31] » Don't be late, Mike. >> Say what? [46:34] » Told him not to be late. >> Okay, other Mike. [46:39] » That moves us to item two. Finally, ordinance establishing the maximum [46:45] property tax dollar amount for the library fund and library [46:50] employee benefit fund. And we only need half of that, right? [46:55] » We don't we don't table or we table that tonight, right? [46:58] » That this is tied to your budget adoption. So you would not take action [47:01] on this item tonight. You would table it. [47:03] » Yeah. >> Till the hearing date. [47:07] » So make a motion to table that somebody. [47:14] Uh, >> I make a motion to table the proposed [47:18] ordinance number 2270 establishing the maximum property tax dollar amount for [47:22] the library fund and library employee benefit fund for the Augusta Public [47:25] Library until after the >> until the 21st. [47:30] » Yeah, until September 21st. >> Second. [47:34] » Got a motion and a second. Erica, do you want to call a roll call vote? No. All [47:40] right. All those in favor of tableabling this say I. I. [47:44] » Any opposed? Motion carries. [47:50] Okay. [47:53] Item number three, annual request for ex to exchange federal funds staff. [48:01] » Yes. Uh mayor and council, the federal fund exchange is KOT. Federal fund [48:05] exchange is a program that KOT launched many years ago and you get an annual [48:11] allocation from the federal government an annual amount of funding that you're [48:14] able to use on transportation related projects. But if you use that money [48:18] there's a whole lot of red tape that goes along with that and it can make [48:23] your project quite a bit more expensive because you have to follow all of the [48:26] federal requirements anytime you do a project. Uh so what KOT launched I want [48:32] to say back in like 2008 2009 time frame is something called the federal fund [48:37] exchange where what they do is they are willing to give you 90 cents on the [48:42] dollar. They assume all of the federal requirements and they take the federal [48:47] money and then they give you 90 cents and then they free you of that burden of [48:51] having to comply with all of the federal requirements. [48:55] And so um the uh the amount that is appropriated to us this year is [49:01] $133,653.13. [49:05] So the fund exchange would be 90 cents on the dollar which is $120,288.13. [49:16] Um attached are the forms and the description of the program. What we're [49:22] recommending is that you go ahead and utilize uh the form to get reimbursed [49:27] for the uh the PPP, the pavement preservation projects that we recently [49:32] did throughout the city. And then that money can go back in to our uh our [49:38] transportation funds and uh be used on other projects or just be used to um put [49:45] our put our cash balances back in place. Um, I'm going to go ahead and speak a [49:51] little bit to the subsequent item. They are separate items, but uh, in the PPP [49:57] program, we had two roadways that are technically park roads. They're not the [50:02] same thing as residential streets. That was Garvin uh, Park Road and Augusta [50:07] Avenue. And our plan on on those was to utilize funding out of capital [50:12] improvement fund 16 instead of street sales tax fund because the street sales [50:18] tax fund exists for you to do maintenance essentially on platted city [50:22] roadways. Those are unplatted roadways. So those two we were paying for capital [50:26] improve out of the capital improvement fund. Uh, one of our recommendations, [50:31] and you'll see this in the subsequent item, is that when you reimburse uh, [50:36] your project for the streets that you reimburse the capital improvement fund [50:41] as well, and then that helps you pay for the uh, the next item that's on the [50:45] list. Again, they're they're unrelated for your action right now, but I wanted [50:48] to explain that relationship briefly before we get to that item. So, the [50:53] action item tonight is for council to consider the federal fund exchange for [50:59] the 90 cents on the dollar in the amount of $120,288. [51:04] And it was for the pavement preservation projects [51:10] that uh we recently completed throughout town. With that, I'll turn it over to [51:14] council for consideration. >> Council [51:26] Make a motion to approve the request to exchange federal funds for 2026 under [51:31] the fund federal aid fund exchange master agreement. Authorizing the mayor [51:35] to sign the request form and authorizing staff to reimburse the capital [51:38] improvement fund for the portion of the 2026 pavement preservation project that [51:43] was initially paid from that fund. >> Second. [51:48] » Should I get a second? Okay. [51:52] Got a motion or second. Questions? Mike is the amount of money we're talking [51:56] about that 133,000 >> 120,288 is what we would be reimbursed. [52:03] » What we would receive from >> Okay. And it's to go against the [52:08] $334,000 amount that we paid advance. >> Yeah. So ba basically you just have to [52:13] submit enough of an invoice to cover that amount. So that our project invoice [52:18] was that $334,000. So we're just verifying that we had [52:22] enough expenditures to justify the the reimbursement. [52:26] » Thank you. >> Yes, sir. [52:28] » Any other questions? All those in favor say I. [52:33] » I. Any opposed? >> Motion carries. [52:38] Thank you. Item four, agreement with JEO for [52:42] engineering services for the Red Bud Trail levy crossing staff [52:49] » and Brad. >> Yes, mayor and counselor, city engineer, [52:52] uh Brad Schwarz is here tonight. Um as a matter of introduction, [52:57] uh will provide background. So the uh council previously se re received grants [53:03] and completed construction on the uh the phase 1 red bud bridge over highway [53:08] 54400. You've subsequently received uh grant to [53:13] do the uh the bridge over the whitewater river which is currently in the design [53:18] phase and ultimately moving to construction once design is satisfied. [53:24] Uh you also signed a memorandum of understanding with a local nonprofit [53:29] group called Arty. That's the Andover Augusta Rail Trail Initiative. And uh [53:35] they are committed and working towards the fundraising to complete the trail [53:40] segments between the bridges and the trail portion extending all the way to [53:46] the levy which is our west city limits. So all of that is in place right now. Uh [53:53] once those projects are done, you are still left with a small segment in order [53:59] to complete the connection that currently exists. So right now, our [54:04] existing Redbud trail stops at Lulu Street. It does not extend past that. So [54:10] you have the levey crossing itself. And when I say levy crossing, the levey has [54:15] a designated footprint according to the core of engineers. So, we're talking [54:19] about within that footprint, the core has permitting requirements if you're [54:24] going to have any sort of construction that goes on there. Outside of that, it [54:28] would essentially just be building a similar sort of paved um trail as what [54:34] we built east of Lulu to make that connection. But the project that we're [54:39] doing with this agreement tonight is simply on the on the levy crossing [54:45] itself. So the reason we're proposing this now is you are working kind of on [54:51] multiple timelines at the same time. So you have the transportation alternative [54:57] grant and the calendar that uh JO is working on where uh the project is [55:04] likely to start construction in maybe late 2027 and then finish in 2028. [55:10] Ideally, my thought is if you've completed those bridges, you don't want [55:14] to have a big gap where you're still not connected. You want people to be able to [55:18] finish that connection and get into the city limits. And so, we started talking [55:23] with JEO uh to brainstorm what do you have to do to get on the other side of [55:28] the levy. Uh so they've been working uh to prepare some information regarding [55:34] the flood plane, regarding the work with the core and it's uh it's a lot of [55:39] engineering. I I don't know that the project construction wise is necessarily [55:43] all that complicated. It's just that the permitting is and you have to go through [55:47] that permitting process with the core and on the flood plane stuff to navigate [55:51] it. So JEO has put together an engineering agreement for scope of [55:55] services and that totals $62,500 and that moves the levy crossing portion [56:03] through all of those permitting requirements and then I believe also [56:06] included the bidding and the uh yeah the bidding for construction to actually [56:13] build. Um, I'll let Brad speak to any of the [56:18] other details that are in the scope. And Brad, if you can highlight just some of [56:21] the things that are in there, you know, why why is there so much to it? It is a [56:25] short section, but what are all the different types of permits and things [56:28] that you have to to go after? Um, the previous item that you just voted on, [56:34] what I said is through your federal fund exchange, you can reimburse pedestrian [56:40] or sorry, transportation related projects. This pedestrian trail is a [56:44] transportation project. It's an eligible expenditure. With all of the other [56:48] grants and things that you've pursued, the goal has been to try to finance that [56:52] whole project without having to use local tax dollars. So, with the previous [56:58] action by reimbursing the uh some of that federal fund [57:02] exchange money to the capital improvement fund, you were then able to [57:05] use those federal fund exchange dollars or essentially what got reimbursed to us [57:10] to pay for this engineering. That is an eligible expense. [57:15] That's the 2026 federal fund exchange. That still [57:20] preserves the 2027 federal fund exchange. That still preserves the 2028. [57:25] And if you're averaging about $120,000 a year, those are the sources of funding [57:30] that will help you do the construction when time actually comes for you to [57:34] build the crossing and also to get your connection down to Lulu. Again, the [57:40] whole point of that plan is to fund it with outside dollars without having to [57:44] use your your local money. So, Brad, I'll turn it over to you if you could [57:49] speak to the permitting. Why why is why is there so much involved in that little [57:54] crossing and then we'll turn it over to council for any questions that they they [57:58] might have. >> Yeah. So, I guess the first thing I'd [58:02] say is uh for any road engineer, the worst [58:08] scope of fee to put together is for a sidewalk project because the [58:11] construction cost is relatively small, but all the engineering they do behind a [58:15] road project is being done on that sidewalk. So, our fee looks very high in [58:20] comparison to the construction cost. Uh we are doing um what's called a 408 [58:26] permit, a levy permit, which could be pretty challenging in on here. And then [58:31] there's everything else that we're normally doing um when we're in an area [58:36] where there's water. So um DWR, KDA, Shipo, all of those as well. In addition [58:43] to uh we're wanting to be ADA compliant, we're considering a couple different [58:48] scenarios. We also have to maintain access for the homeowner. Josh has a [58:53] very good picture on the top there. So, there are some some ADA requirements and [58:59] also some access and some coordination we're going to have to do there. So, it [59:04] looks it is a relatively straightforward project, but there are a lot of things [59:08] we need to think through to make sure we're doing it right. [59:16] And I'll stand for any questions. I do have an update on the Ccliff as [59:21] well that Josh mentioned earlier, but maybe hit this one first. [59:29] » Council, any questions for him on the red bed trail crossing? [59:37] » Is the uh levy going to be cut or is this going to go over the top of the [59:43] levy? >> No. And please do not ever use those [59:45] words again. We'll get in big trouble. It's a good question. We uh we will be [59:50] adding fill to the side. So, we kind of have two options here. And I think we're [59:55] coming around to seeing this the way city staff was saying. I was trying to [59:59] keep us kind of on alignment for the sidewalk. Um there's some safety in [1:00:04] keeping the pedestrians away from the road, but particularly that homeowners [1:00:10] access on the northwest corner there makes that kind of challenging. [1:00:13] » Farm, it's farm field. It's not a home, but [1:00:16] » Sorry. Thank you. land land owner. Um anyway, we're not committed. We're going [1:00:20] to explore our options, but the other solution would be to bring up the [1:00:24] sidewalk and kind of come up closer to the road. Uh that would allow that [1:00:31] access road there to um we're not having to push the trail out further, but we're [1:00:38] going to work through some options. >> Doesn't the trail have to stay where the [1:00:41] rail road used to be, where the rail was before? No. [1:00:46] Well, I think Well, I'm not aware. >> Short answer is no. [1:00:49] » Huh? >> Short answer is no. [1:00:51] » No. >> And and it's a very short distance that [1:00:54] we're talking about bringing it up to the road and then bringing it back. [1:00:58] » So, for most of it, it will be on the the old rail alignment [1:01:02] » to make it stay within the rail for trail, you know, whatever they call it, [1:01:07] you know. >> Yeah. [1:01:10] Uh >> I had thought about that. Um, we'll we [1:01:14] can make sure, but I'm not aware of any crank. [1:01:16] » Your rightway is not simply where the bed is. Your w your rightway, I think, [1:01:20] is 100 ft. >> 50 ft on each side. I got that. I [1:01:23] understand that >> there's quite a bit too, [1:01:25] » but I thought right on the [1:01:28] » That's a good point. We'll we'll double check. I mean, certainly an option is to [1:01:32] keep it on alignment. So, if that if that's a requirement, I think we can [1:01:35] make that work. >> And this is basically the 62,000 is from [1:01:40] the levy back to Lulu Street. Is this we're talking about [1:01:44] » and a connection to the west? So both sides of the levy. [1:01:49] » So is it from Lulu to the levey and pass the levey to the west? [1:01:54] » Yes. >> So how far west are you going? [1:01:56] » As far as we need to to touch down and meet ADA. So we can't just go straight [1:02:01] down. We've got to, you know, meet ADA requirements. As soon as we touch down, [1:02:04] we're done. RD takes over and then the K.A. project is going to pick back up. [1:02:11] Okay, there's not been much discussion about any of this in planning, you know, [1:02:16] what's how it's going to be or the layout and going on further west over by [1:02:21] the river and and the bridge itself. You know, it's going to be an interesting [1:02:29] time to figure that out. I guess what you know, tie to it. [1:02:34] » Yeah. So, these two projects will not touch. RD will be in between if that [1:02:38] makes sense. Um, and we are in the middle of design on the the river bridge [1:02:44] and that has been very interesting. >> Thank you, [1:02:53] » Brad. I would be aiss if I didn't ask the same question I always ask. [1:02:58] » Okay. >> On your expedience of how quickly you [1:03:00] think you're going to uh >> be able to get this. I don't want to [1:03:04] buckle you down on a time frame, but >> I just wanted to know. [1:03:09] » That's a really good question. Hopefully in the contract it gives a time frame. I [1:03:13] mean, our intent is to sync it up with the bid of the other project. So, we'll [1:03:18] have this design um bidding with the K.A. project, which [1:03:24] is the the river bridge. >> Thank you. [1:03:33] What I would say, Shane, is that the hard part in any of those times is just [1:03:37] however long it takes the permitting agency to complete it. Um, so I [1:03:45] » Yeah, I'm assuming I'm assuming the permitting is much harder on the bridge [1:03:49] itself and they're in the middle of that right now. And so my my whole point in [1:03:54] working on it now was again so you don't end up fully connected except for that [1:03:58] last thousand feet. it would make sense for it to all open at once if you're [1:04:02] going to do that. So, you're trying to coordinate to accomplish that goal. [1:04:14] » I move for the approval of the engineering services agreement with JEO [1:04:18] for the engineering services in a lump sum of $62,500. [1:04:22] » Second. >> Got a motion and a second. Any other [1:04:25] questions? >> All those in favor say I. I. [1:04:29] » Any opposed? >> Motion carries. [1:04:34] » Would you like a quick update on the CC clip limits? [1:04:39] » Sure. >> Uh, so I asked Riley, um, so from the [1:04:43] western city limits to Walnut, we are designing Milan overlay and [1:04:49] patching. Uh, so some significant street maintenance. And then from Walnut East [1:04:55] to the bridge which is currently concrete pavement today is my [1:04:59] understanding. Uh that is going to be part of this project was [1:05:03] nonparticipating. That means you guys are paying for it and that's just [1:05:06] pavement marking from Walnut to the bridge. So [1:05:09] » this pavement marking >> from Walnut to the bridge. [1:05:12] » Yeah. Okay. >> No significant street maintenance. [1:05:16] » Thank you. >> Thank you so much. [1:05:23] Okay. Item number five, Osage pipeline access [1:05:28] agreement staff. [1:05:34] All right. Thank you, council. Um, so just to kind of give everybody some [1:05:39] information, that handout that I gave you at the beginning of the meeting, [1:05:41] that will be for this item here. Uh so on May 14th of this year, staff received [1:05:47] an access agreement uh request from Osage pipeline. The agreement would be [1:05:53] to bore into areas on or near the levy system to perform soil and groundwater [1:05:58] monitoring wells. Osage is planning to put in about seven wells. Um you can see [1:06:05] the locations on that map that I handed out. Um, I received that today from them [1:06:11] as an update to what was originally sent and was included in in the packet. Uh, [1:06:16] Osage is planning on beginning work on September 14th with approximately [1:06:22] 18-month time frame which would have work concluding in March of 2028 or [1:06:29] thereabouts. Um, when staff first received the access agreement, we raised [1:06:35] significant concerns and questions about whether or not the levy uh or whether [1:06:38] the work would be permitted by the core uh concerning that it was near the levy. [1:06:42] Um, we requested that Osage provide any kind of documentation that they have [1:06:46] communicated with the core um and have received any kind of relevant permits [1:06:51] that they uh required. Um after little bit of time, a couple of months, [1:06:57] we got word back from Osage uh with email documentation from the core saying [1:07:01] that there was no 408 uh permit required or any kind of NWP. Um and that is why [1:07:08] we are bringing this um to your attention today. [1:07:14] And I believe that's that's more or less it. So, just kind of as an update for um [1:07:21] what the site plan was in the original packet versus what I handed out today. [1:07:26] Um I can read out the site numbers for you [1:07:30] if you'd like. Um the far northern location PISB21 has been relocated from [1:07:37] the west side of Dyke Road there over to the east side. um PISB26 has been [1:07:45] removed and then there may have been slight discrepancy on the location of [1:07:50] PISB23 but that would be a difference of maybe a few feet which could just be [1:07:54] attributed to somebody clicking on a different pixel on their mapping system. [1:08:02] So, what we are requesting tonight is that council authorize staff to sign the [1:08:07] agreement uh forward that signed agreement over to Osage Pipeline and [1:08:11] permit them to begin their work um as early as September 14th. [1:08:23] » Any questions? >> I do. Um [1:08:26] » not sure what to ask. Rob, you said you got this map today. [1:08:33] » Different Cooper. >> Oh, yeah. Sam, sorry. Yeah, there we go. [1:08:37] Sam, yes, you got this map today, >> correct? [1:08:40] » Yes. So, the concern I think I've got is just as I'm looking at the [1:08:44] correspondence between TRC and the core. Um, this email is July 7th and it says, [1:08:52] "Our team has reviewed your items for the subject request and does not believe [1:08:56] a 408 review will be needed for the project as shared. Please note, should [1:09:00] the scope of the project change, I ask that you share that with our team to [1:09:03] re-evaluate to see if a review is needed." So, is what you got today [1:09:07] different than what they looked at before July 7th? [1:09:11] To that end, I'm not sure, but I don't believe that the difference between what [1:09:15] we originally received and this would be a difference in scope. [1:09:19] » That would be the only concern I have based on the levy and the core's [1:09:23] restrictions on touching that. >> Great. The the main the main difference [1:09:28] that I see between the two maps is that northern the PSIB21 [1:09:33] » um moving that from the west side of Dyke Road over to the east side. But [1:09:37] functionally, it's going to have the same concern to the core one way or the [1:09:40] other. So, if they didn't have an issue with it being over on the west side, [1:09:43] they wouldn't have any issue with it being over on the east side. [1:09:47] Thanks. [1:09:52] I suppose I should um clarify that as part of uh the negotiate, I'll call it [1:09:58] negotiations with Osage, we did have them add language into the agreement um [1:10:03] that strongly suggest or um strongly reinforce the requirement that they were [1:10:08] going to be responsible for uh repair and maintenance of of the work site [1:10:12] areas and that it would not be the responsibility uh for the city to to [1:10:16] clean up any work. [1:10:30] You look like you have a question or comment. [1:10:41] » Any other questions? >> Do you have any idea how deep these [1:10:46] lines are? The pipes are in the ground. I can't hardly hear you over here [1:10:51] anyway. >> Sorry. Off the top of my head. I I don't [1:10:53] have that information available. >> You don't know how deep they are. I [1:10:56] mean, >> not off the top of my head. No, [1:11:08] » maybe this is just like me missing background because I'm new on council. [1:11:16] I just feel like um I need a little bit background of like how [1:11:23] like the pipeline wants to use this land right to to do some kind of groundwater [1:11:29] monitoring monitoring for their company. Is that correct? Correct. [1:11:34] » Is that much? Okay. So then [1:11:39] they tear up our ground. They fix our ground [1:11:44] but to no benefit of the city other than just [1:11:49] allowing them to use it for their research. Is that right? Is that what [1:11:52] I'm getting? >> They have they have pipeline in the area [1:11:55] already. So a lot of this is just making sure that the lines that are there are [1:11:59] not leaking or negatively impacting the area. [1:12:03] » So there there is a benefit for the community to be able to to know that [1:12:06] information. >> So there there there's monitoring wells [1:12:10] spread all over. this area because of the old refinery. [1:12:15] » Yeah. >> Um and some of that I think they're [1:12:18] required to do by KDH and other types of of sources. I I don't know their [1:12:23] particular circumstance, but a lot of times [1:12:26] » it's it's a requirement that's attached to that old refinery. [1:12:30] » Um >> and yes, to to your point, we've never [1:12:34] had an agreement like that other than the restoration where there's like [1:12:38] compensation that is tied to that. It's just the restoration. [1:12:43] » And is it like because it's so close to the levy that it it needs approval of [1:12:47] it's because it's on the city property that [1:12:50] » our concern was it because it's so close in proximity to the levy that we wanted [1:12:53] the court to be able to weigh in to say whether or not there was permitting [1:12:56] requirement. Our goal was to make sure that the city didn't just say go ahead [1:13:00] and drill do what you need to and then the court come in and say [1:13:04] » you've ruined the levey we have to descertify it and create a whole bunch [1:13:07] of issues there. >> I know the levy is a big deal. [1:13:09] » Yeah. And similar to the last item that we just discussed, if it fits within the [1:13:13] the levy footprint, so you have the levey itself, which is the structure, [1:13:18] and then there's something called the toe where essentially all of those [1:13:21] slopes stop. So within that footprint, uh the core of engineer has permitting [1:13:26] abilities. And anything that goes on in that footprint, they want to know about [1:13:30] it and make determinations what sort of permitting applies. And so in this case, [1:13:36] I think some of it was in the footprint, some of it's adjacent. So, we wanted to [1:13:39] make sure that the core was involved and weighed in before we did anything [1:13:44] accepting the agreement. So, that that was the background on [1:13:47] » it. Okay, that makes sense. Thank you. And when staff received it, they had [1:13:51] indicated that they'd received approval from KDH and we said, "Great, we're [1:13:55] going to send it to the core." >> Yeah. Okay. [1:13:57] » Um they're not the final approver on this item. So, [1:14:01] » yeah. Yeah. I just know we've talked a lot about how picky they are about the [1:14:05] levy and how expensive it can be to fix that. And tell me if I'm wrong. What I'm [1:14:08] hearing is they're required to do this maintenance to make sure nothing's [1:14:12] leaking and ruining our ground. Is that correct? [1:14:15] » That's my understanding. >> They're not doing it because they're [1:14:20] such a good citizen. They're doing it because the EPA and the Kir [1:14:26] them to do it or some other government agency. [1:14:30] » I'm not trying to bash them, but >> no, [1:14:34] » they're a business. They wouldn't do this if they didn't have to. [1:14:38] » I just think it's in our town's best interest also to make sure it's not [1:14:41] leaking. >> Yeah. Containing command [1:14:46] » turn our land up. >> Contaminating. [1:14:50] » I move for the approval of a requested access agreement with Osage Pipeline [1:14:54] Company LLC to access city property to perform soil boring and groundwater [1:14:58] monitoring activities on or near the city's levy. [1:15:01] » Second. >> Got a motion and a second. [1:15:05] All those in favor say I. >> I. [1:15:07] » Any opposed. >> Motion carries. Thank you, Sam. [1:15:13] » Are you here for the next item? >> Yes, I am. [1:15:17] Item six, 2026-03 reszone from R2 [1:15:24] small lot line and R1 single family residential to [1:15:30] an I1 industrial with a planned development overlay [1:15:35] staff. >> One second, Sam. Um, so mayor and [1:15:38] council, just for clarification, since you took no action on the library [1:15:43] ordinance, I believe that number was going to be ordinance number 2270. So I [1:15:49] think that that is the number that you would be considering here where it shows [1:15:52] as blank. So uh, that plugs in the blank that's currently shown. [1:16:00] All right. And I'm sorry, the train was going. Are you ready for me? [1:16:04] » The train was going and I couldn't hear. Are you ready for me? Yes. [1:16:07] » Okay. All right. >> But if the train starts, stop. [1:16:10] » Okay. All right. Uh again, thank you, council. [1:16:14] So, the um item that we have before us today is [1:16:20] little bit of a convoluted um item. It's a reasonzoning request for five [1:16:25] properties with a plan development overlay. Um the project location is [1:16:30] going to be roughly at the North Ohio and High Street intersection. [1:16:36] Um the uh developer and their agent are [1:16:41] here tonight, so if you have questions for them, um you can ask them here in a [1:16:47] minute. Um so 11:06 North Ohio and 1124 North Ohio are two properties that are [1:16:55] part of this. they were acquired at uh um auction. [1:17:00] Um the developers plan to expand their current existing commercial self- [1:17:06] storage and recreational storage uh facility um by introducing I believe [1:17:12] three new or upwards of three new uh commercial storage facilities. On August [1:17:18] 12th, uh, planning commission heard the request for the reszone and plan [1:17:22] development overlay and recommended approval. [1:17:26] Um, since we don't see PDO requests in all that often, I did want to give kind [1:17:31] of a background on what a PDIO is and kind of the purpose. Um, so PDIO is a [1:17:37] plan development overlay. Uh really what the goal of a PDIO is is to provide site [1:17:42] design flexibility um and development standards um for different kinds of [1:17:46] projects that may not necessarily cleanly fit into what zoning regulations [1:17:50] would ordinarily require. Um in addition to that, if if a developer comes in [1:17:56] request says, "Hey, I'd like to do this PDO." Um the city then has the option or [1:18:01] opportunity to say we can do that but we're going to also put in some sightsp [1:18:06] specific uh restrictions and requirements um that are going to be [1:18:09] specific to this particular development. U some of those restrictions can be um [1:18:14] restricting uh land uses um requiring buffering requiring lighting [1:18:20] requirements u fencing standards and operational standards. PDO will run with [1:18:25] the land and any kind of major deviations from the approved site plan [1:18:31] um the applicant would have to seek or the property owner in future years would [1:18:35] have to seek an amendment to the approved PDL. [1:18:42] All right, so we've got the site plan up here. Um couple of things to note. Uh [1:18:46] the green does not necessarily show up real well on the overhead there, so I [1:18:49] apologize for that. Um but what we're looking at here overall is um the red is [1:18:57] the uh site plan for the uh proposed resoning and plan development overlay. [1:19:04] The two green areas there are also going to be part of their property, but it [1:19:09] will be outside of the plan development overlay. Um the developers are intending [1:19:14] to leave those areas as as uh there are one designated zones uh for potential [1:19:20] redevelopment uh into um single family homes. Um but with the focus being on [1:19:26] that red area. Um you can see that there are uh several existing buildings. Uh in [1:19:33] the north there's going to be two new proposed buildings and then down to the [1:19:37] southwest is going to be a proposed building. um planning commission did [1:19:43] request that the applicants um add in a 30-foot [1:19:49] um landscape buffering and then a 20 or excuse me 40 foot um building set back [1:19:55] to that front yard area. Oh, excuse me. Um that was to kind of help protect the [1:20:00] aesthetic along the north Ohio corridor. [1:20:13] Ohio Street's right here. [1:20:17] » I want to see the other map. >> Next slide. Yeah. [1:20:23] All right. Then as part of the recommended approval of the PDO, our [1:20:28] sites uh requirements um those will be dictated in the ordinance that's before [1:20:33] you. Um it's going to articulate permitted uses. Um basically it's going [1:20:38] to say that the only permitted land uses that are going to be within that uh PDO [1:20:42] area is going to be commercial self storage and the ancillary um office [1:20:47] space uses. Um it's going to specific or excuse me it's going to prohibit uh [1:20:53] specific industrial uses. Um it's going to set different operational [1:20:56] restrictions uh set free street frontage restriction or standards. uh require [1:21:02] screening and buffering uh set lighting standards and set traffic circulation [1:21:07] standards. Uh so the goal with with all those restrictions is to really make [1:21:11] sure that whatever development is going to be there um is going to be restricted [1:21:15] specifically to essentially the already existing um commercial self storage. Um, [1:21:21] so wi if it ultimately ends up being reszoned to that I1 with the PDIO [1:21:26] overlay, um, no other highintensity industrial use could come in and say, [1:21:32] "Hey, yep, I want to build whatever facility here. It would have to adhere [1:21:36] to the standards that are in that PDO requirement." [1:21:41] » Hey Josh, can I see that Google map again? [1:21:44] » Yeah. And I can provide a little bit more background. So currently there's [1:21:49] the commercial self storage facility that is there existing that existing [1:21:56] property had three different zonings on it. So it was residential up front and [1:22:02] I'm sorry please correct me if I'm wrong from memory. I'm going off of memory [1:22:05] right now. I believe the front lot there were three lots. The front lot was [1:22:09] residential. This um second lot where the office building is where that green [1:22:13] roof is. Wait, that's residential. >> Yep. Then there was commercial and then [1:22:18] a portion of it is zoned is currently zoned industrial. [1:22:22] » Um so when the developer came in they were looking at acquiring additional [1:22:27] property to expand the business which those three houses off of Ohio. So those [1:22:32] are zoned residential and those properties go like all the way back. So [1:22:37] they're really long properties. Um, and they were [1:22:44] looking to acquire a lot of that green space to expand the business. Um, they [1:22:49] were able to acquire two of those homes at auction. Um, and so we're what we're [1:22:55] doing is we're separating those residential lots. The front portion will [1:22:58] remain residential zoning and the rear portion will be absorbed by the business [1:23:04] and the whole property that's going to be used for the business. We're [1:23:08] requesting a reszone to industrial with that plan development overlay to protect [1:23:14] the use intensity into the future. So the PDO allows just the commercial self [1:23:20] storage to be on that property. Um and if it was ever to become any other [1:23:26] business or sold, it would need to have an amendment done to that PO PDO. It [1:23:31] couldn't just be any industrial use. So >> So Cammy, [1:23:36] » there's a lot of moving parts, but But on on Ohio, we're keeping the [1:23:40] residential homes, though. Okay. >> I I would say we're not necessarily [1:23:44] keeping the homes. It's keeping a residential zoning. [1:23:47] » Okay. This is the second option that we had. We had the first one that kind of [1:23:52] put those out on the island, but we've corrected that. [1:23:54] » All right. >> I will say the developers had taken all [1:23:57] of our feedback and made adjustments to their PDO along the process. So all of [1:24:02] the recommendations and feedback that staff has they've incorporated the [1:24:05] feedback we heard from the public and the planning commission they [1:24:09] incorporated and this is the final submission that was approved by the [1:24:13] planning commission. >> Thank you guys for working with us on [1:24:15] that. I was at that meeting and uh because that's W two and I had citizens [1:24:19] concern but we haven't changed it what you presented to the planning zoning [1:24:25] that hasn't changed on the since we've correct since they approved that. Right. [1:24:29] Okay. Good. Thank you. [1:24:38] Council [1:24:47] » looks good to me. Yeah, I mean this was our way of supporting, you know, an [1:24:53] existing business um and really trying to take [1:24:58] advantage of some underutilized land um within the city still. [1:25:04] it will. So we, you know, we also hear through [1:25:09] all when we work with developers and different business owners, you know, [1:25:12] having to invest a lot of money into these engineering plans and site [1:25:18] concepts. Um, so we did work with the developer to get them through the [1:25:22] reszoning and PDO process first and then as long that way they get the support [1:25:28] from you guys to move forward and then they are also actively in the platting [1:25:33] and drainage process. So this will also come before you again as a plat with the [1:25:38] drainage plan as well. My next question is we had the residential upfront, [1:25:45] right? And so our house is our our town is in need of housing as we all know. [1:25:50] We're in a housing crisis. Will you be able to allow any builders [1:25:55] to develop those two up front that are residents? You will and you'll work with [1:25:59] them. Okay. >> Yeah. I will make a note that that does [1:26:05] not have an impact on your vote for the reasoner PDIO. So we are [1:26:10] » an impact on mine. >> I'm sorry [1:26:14] on mine. >> Well the reasonzoning [1:26:18] that is more of a business transaction a private business dealing and it cannot [1:26:22] be used in your decision making process for the reszone. You're looking at it's [1:26:28] whether you want those front lots to stay residential and whether you want to [1:26:32] look at industrial I could look at the big picture in our future 5 years down [1:26:36] the road. >> But who they enter into a development [1:26:40] contract with is not for the city council to decide. [1:26:44] » Yeah. Not really. >> That's what I'm getting at is [1:26:46] » Yeah. I think you and I are not on the same page. I think you think I'm trying [1:26:49] to uh do something I'm not trying to do. I'm just I'm just asking [1:26:53] » I'm just trying to give you the appropriate legal advice for the things [1:26:56] that you're considering when you're making your decision. [1:26:58] » Thank you. >> You said moving parts. [1:27:02] » There are a lot of moving parts. Yes. [1:27:06] » My name is Jimmy. Um I'm the developer. Thank you for having me here. Thank you [1:27:10] for seeing this project. Um letting it be presented. Our our intention as [1:27:16] storage developers is to not take away viable residential housing. um because [1:27:21] it is a crisis all over the nation. With that said, those two houses, I [1:27:27] walked inside of them, they are unlivable. They are in an unlivable [1:27:31] state. Um so our intention is to scrape them and then put two blank residential [1:27:38] lots back on the market. >> Thank you. [1:27:40] » That that's our intention. >> Thank you, J. So, uh, when you build the [1:27:44] the next couple pieces back here, is is it going to be like a [1:27:49] a lot of concrete or is it going to be rock, some kind of pvious? [1:27:52] » It'll be asphalt as Yeah, that's what's on the PDIO overlay is is asphalt [1:27:56] paving. An imperous pavement, [1:28:01] » any kind of ponds for runoff or >> because I mean, we we all know how the [1:28:08] the water travels through town. that that will be at a later date once we get [1:28:11] through the platting process. [1:28:16] » And we had those preliminary conversations with them when they first [1:28:19] came into our office before we even went down the PDO route is that there would [1:28:25] be some drainage that needed to be addressed, some significant drainage. [1:28:30] Um, so they they've been aware of that as they're building out these plans. [1:28:35] » Thank you. So, um, Matthew Tucker, agent for the applicant. Um, what the next [1:28:41] thing that you guys are going to see, as Cammy had mentioned, is the platting [1:28:46] process. And inside that platting process, we have to do a drainage report [1:28:50] that will be based on the site plan that also has to go through permitting. And [1:28:54] um, a big part of this was actually the discussions and we've had meetings. [1:28:59] we've got to satisfy some drainage needs in the area because of the capacity of [1:29:02] that channel back there because of some city requirements and things. So, um [1:29:07] those documents are all in the process of getting submitted. They'll have to go [1:29:11] through their reviews and a final site plan review to make sure that we don't [1:29:14] negatively impact the drainage. I can tell you that this PDO doesn't show any [1:29:18] final design for drainage, but it is absolutely something that we have to [1:29:22] consider on the site. >> Okay. Thank you. Y [1:29:24] » thank you. [1:29:30] Any other questions, >> Cammy? For that Southwest building [1:29:34] that's proposed where it has that 30foot landscape buffer, what does that [1:29:39] actually >> look like? [1:29:41] » Um, would you like to speak to it, Matt? >> Thank you. [1:29:46] » So, uh, the landscape buffer is kind of a unique thing to this site and we had [1:29:50] to kind of jump through some hoops to define what that really was. Uh the [1:29:53] intent of that or or um the reason that that's there is it was one of the [1:29:58] outcomes of the back and forth with the planning commission and and city staff. [1:30:03] There's a an old Yes, that tree right there. That tree right there is what's [1:30:08] driving the landscape buffer. We wanted to make sure that we stayed outside of [1:30:10] the root system for that tree. Um there's a desire that was expressed at [1:30:15] the planning commission meeting that we don't ruin the feel of the neighborhood. [1:30:19] And so we wanted to ensure that there would be street tree space and green [1:30:23] space out front um beyond just what you govern with a building setback. So the [1:30:30] landscape buffer is going to prevent any paving out front there in that space. So [1:30:36] it's going to make sure that our our screening fence and any paving or orisle [1:30:41] is back behind that 30foot. And that's why we put that in there. um that is in [1:30:46] line with what would be the building setback for those residential lots to [1:30:51] the north. So, we're actually going to ensure not only are we not upstaging [1:30:55] those residential lots, but we're ensuring a a nice green space out in [1:31:00] front and then our building set back is even further back yet. [1:31:05] » Thank you. And I saw in the PDO requirements that some type of [1:31:09] architectural element was for the street facing side [1:31:13] of it as well. So there's intended to be some of that on that that faces Ohio. [1:31:17] » Correct. >> And then on that Google map photo where [1:31:20] the stone fence to the south of that proposed building ends and it turns to [1:31:25] rot iron. Is there an intent to screen that more so that that new building is [1:31:30] not visible from the cemetery right there or what is that plan? [1:31:34] » So there is a screening requirement that requires that 8 foot solid screening. I [1:31:39] believe I'd have to go back to the survey. I'm not sure if you can tell on [1:31:42] the PDO where the end of that uh masonry >> wall is versus the the landscaping [1:31:48] buffer, but the landscaping buffer, that 30 foot landscaping buffer, that's going [1:31:52] to be about where that screening wall is. And so that screening wall would [1:31:55] would be required to be continuous at least to to connect to that if that [1:31:59] doesn't come as far forward as that 30-foot buffer. I think that may [1:32:02] actually be pretty close to where your 30- foot buffer is. [1:32:05] » Yeah, it kind of looks like that. And I just noticed that on that PDIO, the 8 [1:32:09] foot buffer is delineated on the north side of it, but it's not on the south [1:32:14] side. So that's why I was asking >> the 8ft buffer. [1:32:18] » Yeah, the 8 foot buffer. >> We've focused more on the north side [1:32:23] around the residential properties, >> right? [1:32:26] » Yeah. The 8ft screening fence. Yeah. Yeah. Yeah. Yeah. So it's got to come [1:32:30] there's if you zoom in on that, I don't know if you can, but there's kind of a [1:32:33] squared fence line. That fence has got to come all the way down along those [1:32:38] residential lots on the back, too. Right. Um it's it's a general screening [1:32:42] requirement. And it actually should stop um at the landscaping buffer there where [1:32:49] it hits Ohio. >> Yeah, [1:32:50] » it looks like it does not. It should. Uh and then that that buffer fence would [1:32:56] then come down along the landscape buffer line. [1:33:01] » And did we have public comment for the planning? [1:33:04] » We did. And what was the public comment? >> Um, well, we received some written [1:33:08] communication. We had some conversations over the phone. We did have some comment [1:33:14] at the public hearing, but do you want to speak to it? [1:33:18] » Yes, I would kind of preface >> summaries. Um yeah, I would kind of [1:33:22] preface the the public comments um with the idea that we had originally sent out [1:33:27] public notifications for an original version of the PDIO site plan um that [1:33:33] ultimately was not presented to planning commission. So some of them the public [1:33:37] comments that received are in relation to that first plan that weren't [1:33:40] necessarily applicable to the current plan. Um but in general a lot of the [1:33:46] concerns were related to uh traffic um impact to just kind of neighborhood [1:33:53] character and then kind of what the ultimate vision for the city is long [1:33:58] term. there there was some feedback about [1:34:02] maintaining those three front properties as residential [1:34:06] um and keeping those as residential and then also some feedback of they're [1:34:12] supportive of this PDO and the expansion um but they don't want to see a lot more [1:34:18] industrial and probably even some commercial in this specific corridor. [1:34:26] » That's my questions. I would just say I applaud you guys for working with them [1:34:30] and building the feedback into your plan. So, appreciate that. [1:34:34] » Agreed. [1:34:48] Council, [1:34:52] I move for the approval of ordinance number 2270 [1:34:56] reszoning certain property within the city of Augusta, Kansas to an A1 [1:35:00] industrial zoning district with a plan development overlay PDIO approving a PDO [1:35:05] site development plan and amending the official zoning map of the city of [1:35:09] Augusta, Kansas. >> Second. And then that's I1. [1:35:13] » Oh, sorry. What did I say? >> A1, [1:35:16] » guys. It's almost 9:00. I'm real tired. You want me to resend [1:35:23] it to I1. >> You still second. [1:35:28] » She amended her movement motion. I said second. Second, third, fourth, and [1:35:32] fifth. >> All those in favor say I. [1:35:36] » I. Oh, it's a roll. >> It doesn't say that. [1:35:42] Well, I said Martin. >> Hey, I'm sorry. [1:35:46] » It's a roll call vote since it's an ordinance. [1:35:48] » Oh, it is. >> Martin, it doesn't say that on the [1:35:51] » Yes. >> Lick Lighter, [1:35:52] » yes. >> Bailey, [1:35:54] » yes. >> Scott, [1:35:55] » yes. >> Richardson, [1:35:56] » yes. >> Davis, [1:35:58] » yes. >> Whitey, [1:35:59] » yes. >> Mah, [1:36:00] » yes. >> Motion carries. [1:36:03] » Thank you. Thank you. >> Okay. Thank you, gentlemen. Thanks for [1:36:08] investing in our town. [1:36:14] » Wow. >> Item seven, guaranteed maximum price [1:36:17] amendment with Don Winger and Sons Construction for the August public works [1:36:21] complex staff. [1:36:26] » Yes. Uh, mayor and council, this item is uh related to past actions that you've [1:36:32] taken on the public works complex as you recall uh in [1:36:37] » Hang on. Josh, I >> I can't hear you. Something's wrong. [1:36:41] » Yeah, I've been >> Okay. [1:36:50] In uh May of 2026, the council entered into a contract, a construction manager [1:36:56] at risk semar contract with Don Linger and Sun's construction. As you remember, [1:37:03] as you might recall, under that model, we are working in partnership where the [1:37:08] contractor, our engineer, and the city are a team that are actively working on [1:37:14] the design on value engineering from the beginning as a team. And up to this [1:37:20] point, the council has authorized the um the maximum amounts for certain line [1:37:27] items but not for the overall project. And uh those it those line items were [1:37:33] updated on August 3rd, 2026. It shows that list that was included tonight. [1:37:40] What you have before you is the uh the guaranteed maximum limit essentially for [1:37:46] all of the other line items in the project. So this is setting the maximum [1:37:50] for the overall project. Uh that number was negotiated between staff, between [1:37:56] the engineer and with Don Linger. And the guaranteed maximum price came out at [1:38:01] 7,520,913. [1:38:06] That is also inclusive of uh over $300,000 in contingency. So we've left [1:38:12] us some some room in case anything comes up. uh if it doesn't come up then that [1:38:18] that is money that we don't necessarily have to spend. Um this also gives this [1:38:23] the ability to to be under as well. But if you're going to exceed any of the [1:38:29] align items, that can only be done by a change order approved [1:38:34] uh by council. Um [1:38:39] what I'm going to show you as you have this contract. I'm going to skip down to [1:38:45] where the line item proposal is because this shows you [1:38:50] um essentially the whole scope of the project. If you all can see it, you may [1:38:55] not be able to read every single line from what I'm showing up here unless I [1:38:59] zoom in really close, but do you see the green color that's in the notes section [1:39:02] off to the right? That bullet point list. Uh this green color is showing [1:39:08] what you had previously approved and what you had locked in. The amendment [1:39:13] before you tonight, everything that is not shown as green is getting locked in [1:39:17] as a maximum price. So that's the overall contract, but that's also on a [1:39:22] line item basis as well. And so uh this sets the overall uh maximum number of [1:39:30] 7,520,913. [1:39:34] You can see down here. [1:39:45] So there is your maximum number. This number includes 375,000 of contingency. [1:39:51] So there is protection in case we uh we run into something as part of the [1:39:56] project. Uh but otherwise I think staff was happy with the discussions with Don [1:40:02] Linger. we've already come up with a couple of small things or there may be [1:40:05] more along the way. The point of having the team is to do value engineering and [1:40:09] work throughout uh the process to to try to save money where we can and where it [1:40:14] makes sense. And so we already have a couple of small ideas, but there may be [1:40:17] some other things that come up as we're building where we can potentially try to [1:40:21] lower that even more. Uh but this is within the budget that we had [1:40:25] established for the project and so we uh feel comfortable with this pricing and [1:40:32] uh the recommendation tonight is for us to go ahead and move forward and lock [1:40:37] this in our guaranteed maximum price. In uh in doing so, we will officially begin [1:40:45] the uh the mobilization process. So all the way up to this point, all the [1:40:50] decades and years that we've been working uh towards this moment, we're [1:40:54] still not technically in a construction phase, but once you authorize that [1:40:57] amendment and have set the guaranteed max on the project, then Don Linger uh [1:41:01] can start planning their construction. And I believe that their mobilization [1:41:05] plan is to be on site in November starting. Um and then it's going to be a [1:41:10] pretty lengthy construction. There's a lot of buildings and things that go [1:41:13] along with it, a lot of utility upgrades, but they will be mobilizing [1:41:18] in November according to the latest project schedule that's conceived in [1:41:21] this amendment. So, with that, I'll turn it over to you if you have any [1:41:25] questions. Uh Brad is also uh up to speed and in speaking with the other JO [1:41:31] folks that have been working with us on this. So, we'll we'll try to answer [1:41:34] everything that that you have for us tonight. [1:41:39] If if I could, Josh always does a really good job of summarizing just one [1:41:43] insertion. So, between now and groundbreaking in November, [1:41:49] uh we're going to advertise uh hopefully within a week. So, if you [1:41:53] guys approve tonight, we advertise within a week. So, what you have in [1:41:57] front of you is like this is my understanding is this is what Doner says [1:42:03] they'll bid it for. And that's why it's a guaranteed max price. But every item, [1:42:08] every line item we can get a competitive bid on, we're going to get at least [1:42:12] three competitive bid on bids on so the price can come under that GMP. So that's [1:42:19] going to happen a week from now. We'll have three weeks of bidding. Uh so [1:42:23] that's kind of open book. It's very transparent. It's very regulated how it [1:42:27] has to happen in this in the Semar process. Um where we're getting these [1:42:31] competitive bids. Doninger has to submit theirs kind of in a sealed envelope. [1:42:36] um you know they can't get the other biders bids and say I'm going to be at [1:42:41] $1 under that. So they have to submit first and then you get these other bids [1:42:45] from the other vendors. So hopefully we come in even below and then everything [1:42:51] everything before and after that what Josh said is correct. So we're hoping to [1:42:55] break ground. They told me this calendar year they told me November but they said [1:42:58] don't promise council November. So this calendar year for breaking ground [1:43:03] hopefully November. I think we should ribbon cutting in November no matter [1:43:07] what. >> I heard it. Yeah. [1:43:10] » Or a groundbreaking. Maybe get the golden shovels out there or something. [1:43:16] » Josh, not related to the guaranteed maximum, but just the project in general [1:43:20] when they do break ground. Um, will the compost pile be still available and [1:43:24] relocated or what will that look like? >> We've already relocated the compost pile [1:43:28] to its location >> for it was moved for this project. Yeah. [1:43:33] So it won't be moved again. >> It No, it should be perfect. [1:43:44] » This might be a stupid question, but uh we got this maximum bid of 7 million [1:43:49] five. What happens if it goes above that? If something happens and we got to [1:43:54] go above that. >> The point of the guaranteed max is for [1:43:57] that to be your guaranteed max. Now, if it's going to exceed any of those [1:44:02] individual line items, that cannot be done without your approval. [1:44:06] » It cannot be what? >> It cannot be done without your approval. [1:44:12] » So, if they go over and they come back and say, "We can't finish this project [1:44:17] because we don't have your approval." [1:44:20] Are we stuck with a halfbuilt situation? >> I I wouldn't believe so. I mean the [1:44:26] point of having a guaranteed max is you are setting the limits on the project. [1:44:30] So Don Langanger has bid it accordingly to deliver the project. [1:44:34] » Okay. >> I'm just playing the devil's ad going [1:44:37] through this process where you have the individual line item and the individual [1:44:40] elements. It'll have competitive bids as well. The goal is to try to get it even [1:44:44] lower. It doesn't it would not behoove them at all to not deliver on that [1:44:49] contract. And and part of the reason for doing the selection process you did when [1:44:54] Don Linger was selected was to work with a vendor that you felt comfortable [1:45:00] forming a partnership with of that nature to deliver the project. Don [1:45:04] Linger has is an experienced developer, an experienced builder. They have built [1:45:08] many projects for us quite substantial scale and uh we went through a selection [1:45:15] process to choose them as opposed to other potential vendors. part of that [1:45:19] consideration being the likelihood that they deliver the project. So [1:45:26] that that was background before this. Now you can have issues with any single [1:45:30] contract that you ever execute, but we went through a process to end up with a [1:45:35] good vendor that we trusted and and that's where we're at at this moment. [1:45:39] » I've been snake bit before. I need more money. I need more money. So that's what [1:45:42] I'm coming from. >> Josh said that very well. Um, staff has [1:45:47] talked about I think we have a very good contractor. [1:45:53] I think they have a good reputation. I think they're local. I think they [1:45:56] understand that their reputation rides with these. Uh, but there is never no [1:46:02] risk. This is a this is a site that has had what's underground. We don't know [1:46:08] exhaustively. When they start breaking ground, we might find unsuitable soils. [1:46:12] We might find un unanticipated utilities. [1:46:16] So, like I think the key risk that we've talked about internally and with staff [1:46:21] is uh when we're digging foundations, what are we going to find there? Like [1:46:25] it's if if we come back to you, hopefully we don't come back to you at [1:46:30] all because we're doing this under the sub the GMP, but if we do, it's probably [1:46:34] because we're finding something underground that we just we don't know [1:46:37] till we start digging. >> Good point. [1:46:49] Make a motion to approve the guaranteed maximum price amendment [1:46:56] pursuant to section 3.2.6 of the agreement with Doninger and Suns [1:47:00] Construction Company for the Augusta Public Works campus project to approve [1:47:03] and establish a guaranteed maximum price. [1:47:07] » Second. >> It keeps going. [1:47:09] » Got a motion and a second. All those in favor say I. [1:47:13] » I. >> Any opposed? [1:47:16] Motion carries. [1:47:20] » Thank you. Thank you. [1:47:26] » Okay. Item number eight. We want to appoint somebody to the League of Kansas [1:47:32] Mun Municipalities voting delegate appointment. [1:47:39] Kip, you want to do that? [1:47:43] » I'm the only one going to it. Already said I get to it. [1:47:47] » Make a motion to >> point Kip Richardson as the city's [1:47:51] voting delegate at the League of Kansas Municipalities annual business meeting [1:47:54] and convention of voting delegates. >> Second. [1:47:57] » Got a motion and a second. All those in favor say I. [1:48:00] » I. >> Any opposed? [1:48:03] Motion carries. Item H, [1:48:08] matters from and for council. So, we need to consider selection of the [1:48:14] city council members to serve on the safe streets for all steering committee. [1:48:19] What >> Cammy? Is that your committee? [1:48:24] » You do or don't? >> Um, sure. [1:48:27] » Yes. >> Yes. We [1:48:29] » Yes. >> We need one or two. [1:48:31] » You told me it was your >> Yes. We need one or two council members. [1:48:35] Um, it's not a fixed number how many you want to appoint. I think any more than [1:48:39] two is probably too many. Uh, if you only want one, that's fine. But if we [1:48:43] can find one or two that would participate, that would be great. [1:48:46] » I volunteer. >> I volunteer. [1:48:49] » Yep. >> Kip volunteer. [1:48:51] » Did I hear Jake? >> Jake. [1:48:53] » Yeah. [1:48:59] » Do we need to vote on them? if he could motion and vote to appoint. [1:49:04] » Okay. Make a motion. [1:49:07] » I make a motion to appoint Kip Richardson and Jake Maher uh to let me [1:49:14] find it to the city's voting delegation at the League of Nove to serve on the [1:49:22] state streets. I'm sorry. All staring committee. I apologize. [1:49:26] » Second. >> These glasses don't work. [1:49:28] » Got a motion in a second. All those in favor say I. I. [1:49:31] » Any opposed? Motion carries. Okay. Mr. Martin, do you have anything [1:49:38] tonight? Yes. I have one item um [1:49:44] in the block of um Clark Street, the 200 East [1:49:51] block, eastern 200 block of Clark Street. [1:49:56] um had a citizen [1:50:01] very upset about the bricks that are in the road. [1:50:06] And uh when it does rain, we haven't had any rain for a while, but when it does [1:50:09] rain, it holds water where he parks his car, his truck, and it uh very slippery, [1:50:18] but some of the bricks are coming clear up out of the road. I drove through it [1:50:23] today and uh it is a site that needs to be taken [1:50:29] care of, but a lot of the people that live on the south side of that street in [1:50:34] there, it's really, really, really rough. And um [1:50:40] that's all I have, Mr. Mayor. >> Okay. [1:50:45] Matt, have you got anything? >> Nothing, Mr. Mayor. [1:50:47] » Bob, >> nothing. Mr. [1:50:51] I all I got is to echo what Mike said. I had people reach out to me this past [1:50:57] couple weeks about the same thing, same spot, same place, and they're getting [1:51:01] highly frustrated over there. And that's all I got. [1:51:07] Kim. >> Yeah. I just wanted to um I guess [1:51:11] reiterate that we got this meeting coming up on the 14th [1:51:15] and you know public participation you know would be great in input and things [1:51:22] on this so we know kind of have an idea what you want. I know we've heard from [1:51:27] and listened to and seen on Facebook and things several things that have been [1:51:32] mentioned and things, but uh I'd like to like I said rather I'd rather somebody [1:51:37] come down and talk to us rather than see it on Facebook [1:51:43] can just Monday the 14th at 5:30 here. [1:51:48] » Sean, >> nothing for me. [1:51:52] » Nothing, Mr. Mayor. >> Okay. [1:51:54] » Nothing, sir. Mr. Richardson. All right. Mr. Mayor, [1:51:59] make a motion to go move into recess and executive session from 9:07 p.m. to for [1:52:08] 15 minutes um for preliminary discussion of the acquisition of real property [1:52:12] pursuant to the preliminary discussion of the acquisition of real property [1:52:16] exception KSA754319 [1:52:19] uh B6. I asked the city manager Shaw, assistant city manager Cammy Schro, and [1:52:24] the city attorney join the council executive session. The open meeting of [1:52:27] the governing body will reconvene at uh 7:15 20 [1:52:35] » 22 >> 9:22 p.m. [1:52:38] » Second. >> Motion a second. All those in favor say [1:52:42] I. >> Any opposed? Motion carries. [1:52:47] Let's go to the little room over there. Thanks, Major. [1:52:55] » Do you remember Major [2:06:34] You're >> okay. [2:06:36] » Mr. Mayor, I make a motion to exit executive session where no action was [2:06:40] taken. >> Second. [2:06:42] » Got a motion and a second. All those in favor say I. [2:06:45] » I. >> Any oppose? Motion carries. Mr. Mr. [2:06:48] Mayor, I make a motion to recession executive session [2:06:52] from 9:23 to 9:38 p.m. for preliminary discussion of the acquisition of real [2:06:56] property property pursuant to the preliminary discussion acquisition of [2:07:00] real property exception KSA 754319B6 as the city manager Josh Shaw assistant [2:07:07] city manager Cammy Shro and city man attorney join the council in executive [2:07:11] session the open meeting of the governing bar reconvening the council [2:07:14] chambers at 9:38 p.m. >> Second. Got a motion and a second. All [2:07:19] those in favor say I. >> Any opposed? Motion carries. We'll be [2:07:24] back in 15 minutes. [2:22:54] May I make a motion to executive sess exit executive session where no action [2:22:59] was taken? >> Second. [2:23:00] » Got a motion and a second. All those in favor say I. [2:23:03] » I. >> Any opposed? Motion carries. [2:23:07] » Mr. May I make a motion to go in executive session for 20 minutes um from [2:23:12] 9:38 p.m. to 9:58 p.m. to discuss a developers agreement pursuant to the [2:23:17] consultation with an attorney for the public body or agency which will be [2:23:21] deemed privileged in the attorney client relationship justification of executive [2:23:25] sessions under the Kansas Open Meetings Act KSA 75 4319B2 and to invite city [2:23:31] manager Josh Shaw assistant city manager Cammy Schae and assistant city attorney [2:23:36] Andrew Marino. The open meeting will resume the city council chambers at 9:59 [2:23:41] p.m. >> Second. Got a motion and a second. All [2:23:45] those in favor say I. >> I. [2:23:47] » Any opposed? Motion carries. We'll be back in 20 minutes. Just about 10:00, [2:23:53] folks. [2:42:20] He can make it there before they close. >> May I make a motion to exit executive [2:42:26] session where no action was taken? >> Second. [2:42:28] » Second. >> Got a motion and a second to exit [2:42:32] executive session where no action was taken. All those in favor say I. [2:42:37] » I. >> Any opposed? Motion carries. [2:42:40] » Mr. Mayor, make a motion to journ this meeting. Second. [2:42:44] » Got a motion and a couple seconds to uh end the meeting for the evening. All [2:42:48] those in favor say I. >> I. [2:42:50] » Any opposed? Motion carries. Remember, next Monday night, 5:30 here, budget [2:42:56] meeting. [2:43:05] » Yeah. >> Good night.