[2:45] [Background noises] [3:44] Reinaldo Borges, Chair: We call the meeting [3:46] to order, the Pledge of Allegiance. [3:54] I pledge allegiance to the flag of the United States of America [3:56] and to the Republic for which it stands, one nation under God, [3:56] indivisible, with liberty and justice for all. [4:05] You have had a chance to go over the minutes, any comments ? [4:16] We also want to welcome our new member here [4:21] to the city replacing Dwight, Dwight [4:25] went on to a more relaxed life. [4:30] Welcome. [4:41] All those in favor I aye? [4:47] Minutes approved. [4:53] Speaker: Please be advised the following items on the agenda [4:56] are quasi judicial in nature, please be ready to comment when [5:02] the chairman asks for public input for the item . [5:10] All testimony including public testimony and evidence [5:13] will be made under oath or affirmation. [5:16] Additionally, each person who gives testimony [5:18] may be subject to cross-examination. [5:20] If you refuse either to be cross-examined or to be sworn, [5:24] your testimony will be given its due weight. [5:27] The general public will not be permitted [5:30] to cross-examine witnesses, but the public [5:32] may request the Architectural Review [5:34] Board to ask questions of staff or witnesses on their behalf. [5:37] Persons representing organizations [5:39] must present evidence of their authority [5:42] to speak for their organization. [5:44] Further details of the quasi judicial procedures [5:47] may be obtained from the clerk. [5:50] Do we have any disclosures of communications concerning either [5:56] of the items on today's agenda? [6:01] seeing none, please swear in anyone who wishes to be heard [6:06] today.. [6:11] Village Clerk Juan D. Garcia: All those providing testimony [6:14] please raise your right hand, do you swear to tell the truth, [6:18] the whole truth and nothing but the truth? [6:22] thank you. [6:50] Speaker: We received the written confirmation [6:53] they are in Agreeance with the conditions. [6:56] It follows the village code and planning ordinance. [7:24] Brett Loman: This project was originally approved back in 2023 [7:28] and awaiting construction for several years. [7:32] The owner and design team have seen opportunities [7:35] for design improvements to the overall site plan as well as [7:39] architectural features. [7:41] What's been presented today is the overall site plan, [7:45] which I can present just briefly in a series of renderings. [7:51] Initially we had a series of external renderings going around [7:55] the perimeter of the property, I supplied those and also provided [8:00] updated renderings so we can see those previously approved versus [8:03] what's being proposed right now . [8:08] On the overall site plan, just a few things [8:10] that are being updated. [8:12] Starting in the Northwest corner, [8:16] originally that was more of a site circulation space and what [8:21] we've done here is to provide a flat grass area . [8:28] As we work around the perimeter of the property, [8:31] we've been identifying corridors for trees, larger specimen trees [8:38] and renderings, we've got the before and after shots [8:42] for the landscaping scheme. [8:46] as we work our way around the site, [8:49] there's an outdoor barbecue area which originally [8:52] was part of the garden before. [8:54] We are presenting an outdoor patio which you will [8:56] see in the exterior renderings. [8:59] The site circulation towards the Northeast corner [9:03] of the property, which is the lower plan right [9:06] is being reconfigured to be more efficient [9:09] as well as for staff parking, exterior work services, [9:14] it's all going to be sheltered by hedging and landscaping [9:19] from the street. [9:23] this area highlights the overall main floor level plan [9:26] and there's three features I want [9:27] to identify that are being updated from the previously [9:30] approved project. [9:33] The first one starting at the upper right originally [9:36] we had an exterior stair tower. [9:40] Since this project has gone underway, [9:43] we realized the better function for this massing which [9:47] remains consistent from the previously approved blueprint [9:50] was a storage condition as opposed [9:53] to an exterior stairway which is not needed. [9:56] The next is the entry vestibule, originally [10:00] the glass ran all the way across but we decided [10:03] to create more of an experiential quality [10:06] vestibule itself which you will see in some of the renderings. [10:50] Reinaldo Borges, Chair: There is no visual aid [10:54] to understand what is really being changed, which puts us [10:58] in a difficult position. [10:59] Are you attorney, architect? [11:05] You understand now how we approve this thing [11:10] three years ago. [11:15] Brett Loman: When this was first submitted, [11:17] it was asked to remove the clouds. [11:50] The last on this plan is this footprint here, [11:56] originally it was proposed as covered parking [11:59] and now we are enclosing this space as an enclosed garage. [12:31] Directly above is this two bedrooms and a common living [12:35] space. [12:35] One of the changes that we made as a bump out here, [12:40] I could have shown what it looked like before versus what [12:44] it looks like now, but the living room and bedroom [12:46] to the right of it had gone straight across [12:49] and now it's being bumped out to increase that area. [13:20] on the upper level the only other changes [13:23] is directly what I explained to the ground floor plan. [13:29] Entry on the ground floor remains [13:32] under the previously approved roof canopy, [13:34] but it is a proper bump out to create that entry vestibule. [13:39] The last change on this plan is the storage tower, [13:43] which originally was the upper portion so it's been converted [13:49] into a storage within the existing footprint that [13:53] was previously approved, it's just [13:56] a change of function within this footprint. [14:28] Brett Schlacter, Board Member: Nothing to disclose. [14:33] Brett Loman: What's been shown on these next slides [14:36] is the originally approved rendering versus the proposed [14:41] rendering which is directly below, and what we need to do [14:44] is take nearly the exact same shot [14:46] so you can understand what was previously [14:48] approved versus what is being proposed at this point. [14:52] Some of my comprehensive comments [14:56] on what was being proposed, what this is showing [14:59] is that the elevation from the cul de sac [15:03] remains nearly identical to the original proposed, so there were [15:09] some functions occurring on the left hand side with the staff [15:12] parking site circulation, but those remain behind landscaping. [15:18] The architectural landscaping itself in this view [15:22] remains consistent. [15:23] Some of the areas I described are further on down the slides. [15:30] Just to reiterate what was previously approved, [15:34] we had the overall landscape hedging on the left hand [15:38] side coming towards the main entry [15:40] to the house which remains consistent with the original, [15:43] and on the right hand side we have this water feature element [15:47] that wraps around toward the right hand side [15:49] and I will get into that on a later slide [15:54] but this elevation remains consistent with what [16:00] was approved. [16:08] This rendering is meant to show the program change [16:13] within the footprint, here the original proposed rendering [16:17] which was approved was consistent [16:20] with the adjacent glass elevations [16:22] and in the proposed rendering we are bumping out the entry [16:25] vestibule to provide a proper entry and more [16:29] of an experiential quality to this project. [17:02] This view up top the original rendering was approved [17:09] with some adjustments to the landscape, [17:13] but the overall massing remains consistent. [17:18] You will see it's very subtle, but the bump out to that portion [17:21] directly above the garage . [17:35] Right here was a covered carport, and on this side [17:40] you will see the garage door so it's a pass through garage [17:44] with a door on both sides. [17:48] The main entry on the garage is on the other side of that . [17:58] This view here, again these are renderings wrapping around [18:02] the house from originally proposed so we took the same [18:06] shots in our attempting to show the adjustment within this [18:10] rendering, this is where the proposed barbecue area was . [18:18] As we wrap around the house, this view [18:20] is meant to showcase the adjustment to the trees. [18:23] On the originally approved rendering [18:26] there's a series on the west or intercoastal [18:29] face of the sea wall. [18:31] As this project has come into realization, [18:34] this views towards the water are better without the palms [18:39] and the landscape architect has adjusted the overall landscaping [18:42] plan as well as provided a bit more privacy and shade [18:47] to the southern elevation of the project. [18:55] This view is showing the change from the approved rendering [18:59] which was a garden space to a flat grass relaxation and play [19:04] area. [19:06] Again, the architecture here remains [19:08] consistent with the original and is [19:10] more of landscaping adjustments as you [19:14] go from the north down to the south and around to the Marina. [19:18] There was a question about the change to the elevation. [19:22] The original stair tower here that was open [19:26] screened, since this is being closed, [19:29] it is now stone that comes down and very [19:33] close to the window that breaks down the side elevation of that. [19:38] I would also like to point out the scale from the street, [19:46] you see originally it extended closer to the side yard property [19:51] line and since then we have extended it a little bit less, [19:56] provided landscaping to work to the advantage of masking that [20:01] stair tower . [20:06] Lastly, when this was being reviewed [20:08] with part of these changes, we added this additional rendering [20:13] to showcase the overall elevation [20:15] from the cul de sac a little bit closer, [20:17] so you could see that mass on the right hand side [20:20] and how it's working to be screened through landscaping. [20:29] Thank you. [20:48] Board comments and questions? [20:55] Speaker: My questions are focused on the stair tower [20:58] in the guest parking area or staff parking area, [21:02] we don't have the before to understand what is happening [21:05] in the staff parking area . [21:14] In that Northeast corner, can you describe the changes, [21:19] and help me understand how you are blocking the views [21:23] from the Marina Basin? [21:27] I see you have a four foot fence called out in minimal [21:30] landscaping there . [21:37] Brett Loman: In the previously approved plan, [21:40] the entrance was at this location so it was not changed, [21:44] and the hedging on the street side remains consistent [21:47] so there's going to be a hedge that runs around on the Marina [21:52] side, we are using a fence which the code can only [21:57] be four feet tall but we are using the fence to impose [22:02] that staff parking area there. [22:04] As you work your way to the left or to plan south, [22:08] that's where the landscaping starts [22:10] to pick up and start to screen those site service areas. [22:15] Before, the area was more of a garden, [22:17] and as the project is coming to realization [22:19] we realized we needed a bit more room for enclosures and things [22:23] like that. [22:24] Everything is enclosed with a fence, and where we can [22:28] we are putting an additional layer [22:30] of landscaping per the guidelines [22:33] to shelter this area from public view. [22:43] Speaker: I think that's going to be an area of concern [22:46] because that is visible from the public basin. [22:52] South, you have a lot more landscape but I think that area [22:57] it looks like you would lose two of these parking spaces . [23:08] I just think more hedging, you can't get more than four feet [23:13] with the structure but I think it's [23:14] going to look nicer because that's [23:16] where they're going to be sitting [23:18] entertaining with their boats, I think [23:23] it would be a nicer experience for the community as well. [23:36] Speaker: The tower, it is very large and I'm pretty sure it was [23:43] me that brought up the concern with the mass . [23:48] I'm probably going to recommend you lose one of these date palms [23:53] and add a larger tree in the right of way there to create [23:58] a larger landscape visual barrier, [24:02] because it's a massive structure, [24:04] 35ft tall blank concrete facade. [24:09] It's obscured by a tree that doesn't exist in the plan . [24:24] This is the view here, if you look here you have a 35 foot [24:29] tall concrete wall from the cul de sac . [24:39] If you lose the northernmost one on that, [24:42] I think you'd be able to screen it better with without losing [24:46] the formality of that large colonnade of palm trees . [24:54] That would be my request and recommendation . [25:10] Speaker: I think the trees as shown now really [25:13] start to soften it, I guess it's not a bad idea. [25:19] these are simple things. [25:27] Brett Loman: You're suggesting for more of a specimen tree? [25:43] I think the attempt with this landscaping [25:47] was to try to hide some of this massing, [25:51] because that was a concern when we originally presented. [25:54] I agree with your comments to provide something [25:58] different to try to take away that massing from the street. [26:20] Speaker: Overall, the before and after is represented [26:24] a very harmonious transformation we liked and we approved, it's [26:31] a beautiful house. [26:33] I personally don't see any significant issues, [26:37] there's some layering of landscape [26:39] that architects sometimes push back on but architects love it [26:44] because it does soften a very sort of monumental architecture, [26:49] in this case. [26:53] Those are simple things, I don't know [26:56] if you want to make that a condition [26:57] or a friendly suggestion, the landscape layering. [27:11] I want to point out I'm busy in the neighborhood [27:17] and I'm doing a house across from this one, [27:19] there's a lot of parking already that's Marina parking. [27:23] I'm not saying it's beautiful or attractive, [27:27] there are parking lots you see from around the boat [27:32] but I think layering landscape in front of that would really [27:36] help get the cars to appear more from the perspective [27:42] of the Marina. [27:44] The four foot fence kind of meaningless, [27:50] it would have been nice to see a design for that fence [27:53] but I assume it's similar to fencing [27:55] that we see in the renderings. [27:58] They are probably like 50% or more opacity, [28:03] so there's already an intent to create [28:06] privacy and visual separation. [28:15] so we will put that into our condition. [28:22] We do have public comments. [28:30] these comments come from a neighbor, [28:36] She states you could compare or see [28:40] an overlay of what was approved and what was proposed. [28:44] I think she agreed with me. [28:50] Building taller from the entrance to the East, [28:55] the north feels like we are getting [28:57] blocked in by another wall restricting air movement. [29:02] The color scheme seems to have darkened a bit, [29:05] is there an intention of changing the color scheme [29:08] or is this a rendering effect? [29:13] Brett Loman: I think this is renderings [29:15] and how they've changed over the last few years, [29:18] especially with AI. [29:21] The tree is obviously show a little bit darker [29:25] in this update, the color scheme remains consistent, [29:29] it's just a rendering. [29:47] Speaker: The house seems to be getting even bigger than it [29:50] was, it's enormous. [29:52] My perception is there really no major volumetric change turning [29:58] a carport into a garage , but it doesn't change the massing. [30:06] I like the addition of more green space . [30:13] Those are six comments from a neighbor, [30:16] you could receive these forms from the city I suppose . [30:25] Should we have a motion on this? [30:35] Reinaldo Borges, Chair: Any other public comments [30:37] at this point? [30:39] we are good for moving this forward. [30:46] Speaker: I motion to approve with the condition [30:48] we amend the Northwestern storage tower [30:55] and increase the landscape screening on that side. [31:00] Those are conditions, not recommendations. [31:07] Reinaldo Borges, Chair: Everybody [31:09] agree with those conditions? [31:10] So we move it Forward. [31:16] All those in favor of moving the project forward [31:22] with those conditions say aye? [31:28] Four votes out of four members today, thank you. [31:32] How much more time for completion? [31:38] another year? [31:41] very well. [31:54] Is the next group ready to go? [32:00] identify yourself for the record. [32:12] Speaker: We are here to represent my client, [32:19] as well as his, for a new two story home that is about [32:25] 13,000ft². [32:26] I'm sure you guys have looked at the plans that we submitted, [32:31] and there's a lot of renderings that depict different types [32:34] of materials . [32:39] The outside finishes and the overall design, [32:42] it's a beautiful concept. [32:44] We are trying to get everything that the board has requested [32:48] implementing it, we request if possible for your approval. [32:56] That being said, I have my lead designer who is very familiar [33:02] with the project and I want to bring him to the podium [33:06] and explain more about the concept for the design . [33:21] Speaker: For the record before I start, [33:26] full disclosure I am friends with the foxes [33:30] and have seen the plans in the past. [33:43] Speaker: Thank you for having us. [34:01] Martin Litman: I guess I'll start with some of the exterior [34:04] images so that we can explain what the design process and how [34:09] the creative process started , this is the perfect page [34:16] to start with. [34:18] The top renderings are street views [34:22] and the bottom two renderings are courtyard views. [34:25] The whole concept behind how we started the massing [34:28] of the design really stemmed from the existing house that is [34:32] there today . [34:39] I have a picture that I brought here just [34:41] to give a little reference, this is the existing home [34:44] that's here today. [34:46] The owner really liked that layout, [34:49] and that idea about having two one story structures towards [34:53] the street view , so they wanted to maintain that idea even [34:59] though this is esthetically completely different. [35:02] Really that is what started the design [35:05] to try to adhere with the client's request of having [35:09] these structures be the screening towards the street [35:12] to create privacy, and as you continue to the courtyard, [35:17] these one story structures create a connection [35:21] to the two story structure of the residence [35:24] as it continues towards the west through these architectural [35:30] elements here, which are two beams that connect the one story [35:35] structures to later the rest of the home towards the west. [35:38] The idea is to have a very private courtyard, [35:43] and not only are these two one story structures very important [35:47] functional part of the program, but like I was saying, [35:51] it really creates that beautiful private area in front. [35:55] As we continue moving towards the next page, [36:01] we really don't discuss on the interior but we decided [36:05] to include some images so you can see in general and explain [36:10] the cohesion between the interior and exterior [36:13] of materials can really be seen throughout the project . [36:21] we designed the interiors, but we have an interior designer [36:25] that's going to be sourcing and taking care of all the shop [36:29] drawings, et-cetera. [36:30] We have designed the house entirely, [36:33] even though the exterior is here we wanted to really show [36:37] the interior to have a sense of the overall project [36:43] because the materials on the exterior, [36:47] really there's three main materials being used. [36:51] On the board below, you can see all of the wood accents , [37:00] there's various features. [37:02] You have vertical slats that can be seen here [37:07] which would be on the board. [37:10] Then we have more solid paneling around other areas of the home, [37:14] later we have stone cladding throughout these beams [37:20] and throughout these bands, the roof and the vertical walls, [37:26] and in the center here we have a different stone [37:29] which is more of a marble. [37:34] Those are technically the three materials [37:35] we will be using throughout the project front, rear, interior [37:41] and exterior. [37:42] You can see here how we would tie together the accent [37:47] and at the same time, the wood cladding happens [37:51] to be on the exterior of the portico, [37:54] but then on the interior we bring the marble [37:57] from the front one story structure [37:59] and it becomes a design accent feature, [38:05] everywhere else you have the wood cladding here [38:07] in its different forms. [38:10] Here it's solid, here are the slat versions . [38:17] We also use the slats as a design feature for the entry [38:22] fence and vehicular gate . [38:29] Here on the interior we are using all the same materials, [38:32] the wood and marble and stone. [38:35] As we continue going to the rear, [38:38] we are very consistent with the material selection as well. [38:43] One of the most important features as I mentioned that [38:46] the client really designed, I mentioned one of them was [38:52] in the front which is the one story structures and then [38:55] the other main program desires that they really wanted to have [39:04] their bedroom as far west as possible, [39:07] that's why the entire master suite on the second floor here [39:12] creates the covered terrace below , [39:18] and you can see on the side here to be able to achieve that [39:23] proximity to the water, we brought all of the master suite [39:29] as close as possible, and then we have a side balcony so it [39:36] wouldn't push the bedroom toward the rear or towards the east, [39:40] so that was really the conception [39:43] behind the rear design. [39:44] The entire master bedroom towards the water creating [39:48] the covered terrace is extremely important, [39:53] and they wanted to have the view towards the Northwest, [39:59] and that's what this balcony is there for. [40:03] When you're in the bedroom, this is the balcony area which is [40:07] an additional seating exterior area . [40:14] In many areas of this house the interior exterior connection, [40:17] nowadays you hear so much about in these modern homes, [40:22] we really wanted to help create that interior exterior flow. [40:26] Even though the bedroom has a lounge area where the study is, [40:31] it continues out towards this balcony and you have that [40:36] Northwest view . [40:44] I guess that concludes the presentation, [40:48] maybe it's good to mention that in the pool [40:52] we have a sunken fire pit as well. [40:57] in a way, the shape of the pool looks [41:04] like it's a straight rectangle, but actually [41:08] the pool of water line is more of a U shape [41:13] and the center we carved out a space for the sunken fire pit. [41:20] thank you so much. [41:33] Reinaldo Borges, Chair: Let me ask you a few things. [41:38] A few practical things, just coming [41:43] from the kind of experience that time gives us. [41:47] You have the condensing units on the rooftop [41:50] which is convenient because you bring that noise up to the roof [41:53] and hopefully it doesn't affect anybody. [41:57] But I believe the building code requires [42:00] you have access to a rooftop and access for servicing. [42:15] so that's just a friendly comment, [42:17] because what we typically try to do because a lot of these end [42:21] up having roof terraces as well, since we are going up [42:27] to the roof tariff with some kind of stair, [42:31] you just don't want it to become an afterthought. [42:35] This would create imperfection, so think about that the ship [42:41] ladder thing becomes a last minute thing . [42:48] That's something I think you need to look [42:50] at in refining the design. [42:51] The other question is about your gates, [42:54] we all have this sort of request sometimes [42:56] from clients that want privacy to bring their front gate as [43:00] high up as possible and it looks like the gate [43:08] that you designed seems to be like a ten foot gate. [43:18] Is that permitted by zoning? [43:25] The note says five feet, but the rendering [43:29] is whatever it wants to be. [43:38] Martin Litman: At one point the owner [43:41] wanted to pursue some sort of variance request, [43:44] but they understood we are going to keep it at five feet. [44:09] We thought there was some sort of precedent [44:13] about it, seeing that it wasn't, maybe [44:17] the owner later wants to pursue that in the future. [44:21] I don't think so, but. [44:29] Reinaldo Borges, Chair: Its nice, but also the front door , [44:41] is that in half? [44:46] Martin Litman: When it's closed it's supposed to look like 125 [44:50] foot panel . [45:00] Reinaldo Borges, Chair: But the actual function [45:02] is the lower half. [45:09] Martin Litman: Where this beam is is the 12 foot height, [45:16] coinciding with the window with the glass. [45:26] There's two different types of stones, [45:30] there's the actual marble , which is here [45:36] and on the interior of the portico which I can point out [45:41] in the example. [45:46] the idea is for it to be an opposite of Carrara marble, [45:53] instead of gray with full white, it's actually [45:57] white veins with full gray. [46:08] And then we have another stone, which [46:12] is more to depict something similar to limestone [46:16] but it is still stone. [46:39] This idea of warmth which is what we most wanted to achieve. [46:51] Reinaldo Borges, Chair: The way that the roof is draining, [46:53] you try to avoid any dripping, it seems like there's a smooth [46:58] parapet all throughout . [47:13] Martin Litman: Normal drain on the emergency drain, [47:18] but since you pointed that out, to be able to achieve the thin [47:25] slab esthetic, we actually have above the windows that's where [47:32] we have a drop made out of the same aluminum as the window [47:37] frames . [47:40] You can really see it here how all of the air conditioning [47:45] ducts and the dropped ceiling when you were on the interior , [47:53] the height is to the top of the window but on the exterior to be [47:56] able to achieve the thin slab, we are actually dropping [48:01] or raising above the windows enhancing the actual aluminum [48:05] of the window frames, so that's how specifically here you can [48:12] really see how that horizontal line and in the section you can [48:19] also see how we achieved in this render . [48:36] It's a concrete tie beam, then it will be cladded in the same [48:41] aluminum as the window Correct , the glass goes up to the bottom [48:49] of the tie beam and then the tie beam will be cladded [48:52] in the aluminum. [49:09] Martin Litman: It's a detail we thought a lot about, [49:13] but the window ends prior. [49:23] It was the intention to make it look like the thin roof [49:30] line could be more visible, that's why [49:36] even the stone in the windows are not [49:41] flush with the front of that band, we set it back. [50:02] That section is on the portico . [50:11] About 60% of the length of this eyebrow [50:13] is resting on the portico. [50:15] You can see it here, they touch each other. [50:35] Reinaldo Borges, Chair: It's not about the structure, [50:38] is it supposed to read as a band that's just floating [50:40] or is it part of the architecture of the two story [50:46] element? [50:47] I'm not getting that band. [50:52] It looks like just a floating piece, [50:56] but is it a floating piece or is it part of the whole element? [51:02] Martin Litman: That's why this wood cladding does not [51:05] go all the way to the top of the roof, the band of what [51:08] would be the thickness of the roof is around and has [51:12] the continuation and becomes that eyebrow. [51:14] Basically it starts in this image where I'm pointing right [51:19] now, this would be the balcony. [51:21] Gets towards the front and then it turns the corner, [51:24] goes all the way around and then it connects back to this balcony [51:30] as well. [51:32] Reinaldo Borges, Chair: I think this is still in schematic mode, [51:35] when you slice through a few sections of the house, [51:38] sort of the challenge or the calibration here [51:43] that is going to be key to success [51:44] to maintain the slenderness of those edges [51:46] is how you step it down into sort of that lower roof that [51:51] then is the one that's draining, and you have that parapet. [51:56] I'm trying to imagine how that parapet works, [51:59] and you have to feel these are slender canopies. [52:04] The challenge always with these canopies is how they deal with [52:07] the water and more and more try to sort of push the water off [52:10] the edge so it doesn't drip, because when you get that [52:14] moisture constantly it starts to grow bacteria and it starts [52:18] to get dirty , so these are the things in the tropics that we [52:26] need to work out. [52:28] You have a lot of edges that appear to be very slender, [52:34] I don't know how much water we are capturing and draining. [52:42] Martin Litman: The reason for the parapet [52:45] is so we can have the height to create the pitch. [52:51] Reinaldo Borges, Chair: I see you are sloping them quarter [52:54] inch back to the preferred roof, I [52:58] think that's a good strategy for sure. [53:06] Speaker: I like the front of the house, however [53:08] I'm looking through the drawings and trying [53:10] to understand what you are doing at this level here. [53:14] Is this supposed to be the entire house? [53:19] is the front portion a one story? [53:25] Martin Litman: This is just the main structure, [53:27] let me show you the site plan here. [53:31] There you can see on the second floor [53:33] plan what would be the roofs of the one story structures. [53:38] This is the second floor floor plan [53:41] that shows the roofs of the one story structures [53:43] and then the roof plan shows just the two story structure. [53:50] but we will resolve the drainage for the one story [53:54] structures the same. [53:59] Reinaldo Borges, Chair: If you overlay the roof, [54:01] you have these two openings for palm trees on the other side [54:04] of the entrance but when I go to the roof plan I'm not seeing [54:08] that so I'm trying to understand it. [54:14] Martin Litman: Because you have that eyebrow that you were [54:17] asking me about before that goes across . [54:37] The roof comes to here, so basically this area here [54:42] would be the eyebrow and this would be the portico. [55:02] Reinaldo Borges, Chair: A public comment, [55:04] and then we will continue. [55:27] Heather Brecker: First I will say [55:29] that's a beautiful rendering. [55:31] We have been residents for six plus years now. [55:38] I will read this to you... [55:42] For six consecutive years we have [55:46] dealt with construction next to or across from our home. [55:49] At that time we had a son who was not even yet one years old, [55:53] and with no meaningful regard for the fact that we [55:56] were residents, our family's home, and the place where [55:59] we are entitled to live, reasonably [56:02] has been impacted by this construction for our safety, [56:06] health, and quality of life. [56:08] This has not been a short term inconvenience, [56:11] six years is a long time living with ongoing noise, dust, [56:17] vibration, distraction, loss of privacy [56:20] and the constant intrusion that comes with construction [56:23] of not just a single family residence [56:25] but as you know some really massive, significant [56:28] construction projects in the vicinity five houses down [56:34] or across where our home is located. [56:38] While we all live in a beautiful community, [56:40] we also live in a community, and I [56:42] do want you to understand that our living has been impacted [56:49] substantially by all these significant construction [56:53] projects that are now beautiful homes, [56:55] and we have dealt with living through all of this [56:58] like I said for six consecutive years. [57:01] The burden of that development have [57:03] been placed almost entirely on the families who [57:06] live in its path. [57:09] I don't want to go on longer than this, [57:11] but our address should not become a permanent construction [57:13] zone simply because development is permitted, [57:16] there has to be a point at which the impact to the people [57:19] and the lives who live here have matter [57:22] and therefore ask you to understand [57:24] timely the consideration not only [57:26] of just where we are at, but our health [57:28] and well-being and the safety. [57:31] I will let my husband continue. [57:38] John Brecker: It is a beautiful house, unfortunately [57:41] we're not going to live there when we have [57:43] the burden of construction. [57:46] The house across from us is currently building Of 500 zero [57:52] square foot house and next to it it's [57:54] been five years of that construction. [57:57] I brought a picture today of when [57:59] we walked in here the cars that are lined up on the street. [58:02] Some days it's impossible for us to get out of our driveway, [58:05] we've gotten a flat tire, we've had to change multiple, [58:10] we've had to change our air conditioning [58:12] system because of all the dust. [58:13] There's been vibration constantly [58:16] that has affected our foundation of our house, [58:19] and that's not just our house, that's [58:21] people along the corridor. [58:23] We've had construction behind us, next to us, and diagonally [58:28] for the last six years. [58:30] We have a seven year old who can't go out and play [58:36] because there are trucks and construction workers constantly [58:42] coming by. [58:44] I think this needs to be put into consideration, [58:48] 1300 zero square foot house in a number of years in construction. [58:52] We've lived here for six years under these conditions, [58:54] and I don't think anyone in this room [58:56] would buy a house that you've had construction [58:58] of this magnitude for so long, and with the disruptions [59:03] that we've had. [59:04] There's noise disruptions. [59:05] I work from home, there's noise disruptions. [59:08] I think that this really needs to be thought of. [59:12] As specifics to the house, the two main buildings [59:16] they want to build right onto the street, I really object to. [59:21] It's going to be a massive project for them to build those, [59:24] it's going to be all trucks and noise and dust, [59:27] we live right across the street. [59:30] Is not taking into account the neighbors that live there. [59:34] It's beautiful, but it's a huge inconvenience [59:36] to us and to our neighbors, so I think the sign needs [59:40] to go back and be changed. [59:42] It would be one thing if you kept it all the way back [59:45] and had a courtyard, but to build those two pieces, [59:48] it's going to be a huge disruption to us. [59:51] Not to your clients, but to us, so I [59:55] think it needs to be a really thought about design [59:58] of this property so it's fair for the people who already live [1:00:01] here, along with the timeline. [1:00:05] I think there's needs to be a discussion . [1:00:12] There's no room to park . [1:00:20] Heather Brecker: I have to call the gates sometimes to get out, [1:00:24] God forbid there was an emergency. [1:00:30] We have two points that have been many times [1:00:33] literally blocked and people get in the way and they go fast. [1:00:37] If my son is coming home and he just wants to go outside, [1:00:40] I'm worried someone's skirting by at 60mph because they want [1:00:45] to just get through the area because it's such mayhem. [1:00:51] John Brecker: There have been many times [1:00:53] you go through the street and can't get through. [1:00:56] You either have to wait or go around. [1:00:58] This plan of a 1300 zero square foot of this house at this time [1:01:04] is not realistic, we cannot handle the amount [1:01:06] of construction or vibration. [1:01:22] Reinaldo Borges, Chair: Thank you [1:01:23] for your honest presentation. [1:01:25] I'm trying to share and lead this board. [1:01:32] My thoughts are that we are trying [1:01:34] to look at design, esthetics, consistency, contacts, [1:01:39] and there's a criteria we have to follow. [1:01:44] What is outside our realm here is really [1:01:46] all the issues created by this excess [1:01:52] in buying homes, tearing them down, and building [1:01:57] larger homes, that's kind of the constant trend. [1:02:01] Your city commissioner and the mayor [1:02:04] would be the people to really understand your concern, [1:02:08] they understand the limitations of what they can do [1:02:12] to sort of create legislation. [1:02:15] From a design point of view, the city has a zoning consultant [1:02:21] that looks at does the house comply with zoning criteria [1:02:25] and then the official reports to us as a board , [1:02:34] does the project meet the zoning criteria of the village. [1:02:38] Does, otherwise it wouldn't have gotten to us. [1:02:45] Then, does it meet the building code [1:02:47] and all kinds of other technical aspects of the code [1:02:53] officially read into the record and creates a series [1:02:57] of conditions to move forward. [1:03:00] That's the typical process, I see what you are saying every [1:03:04] day, I see it in Palm Island and Hibiscus Island and Palm Beach [1:03:09] and Delray and all the beautiful luxury communities we have [1:03:13] in Florida that are now gaining a lot of attraction people want [1:03:17] to come and live in the same environment that you live, [1:03:21] it's a big challenge to all of these communities , [1:03:27] everybody is having to deal with construction traffic . [1:03:33] You have an effective gate in trying to manage things, [1:03:36] but it is kind of pure chaos because a lot of people [1:03:41] are allowed in because they are contractors working [1:03:43] different projects, and what they do once they get in, [1:03:47] who's going to be policing how they park and drive. [1:03:52] All these concerns about safety for yourselves [1:03:56] are legitimate comments, but I don't [1:04:00] know what to do about it because we have to judge is it [1:04:04] contextual, is it going to perform well, [1:04:07] does it have adequate landscaping. [1:04:09] The two frontal garages are in the zone they are allowed, [1:04:14] they are not doing anything that is not allowed [1:04:16] but what we see is when people are building these larger [1:04:19] homes a lot of times they come to us [1:04:21] and they have one parking garage and we [1:04:24] say how is that going to work? [1:04:27] We do see a future hopefully where a lot of us are not going [1:04:30] to be using too many cars , they still have to go somewhere so we [1:04:37] do have concerns. [1:04:38] This house appears to have two garages for two cars, plenty [1:04:42] of car capacity, but your concern is understood by me, [1:04:47] and I will just allow the other board [1:04:50] members to state the concern and comments about this. [1:04:53] We have a resident actually sitting with us , [1:05:00] that's all I have to say. [1:05:08] Speaker: The street is very complicated, [1:05:10] I can't get out that exit any day, it's always blocked . [1:05:18] It's complicated, but I can also say the team have really stepped [1:05:25] it up . [1:05:29] Trying to impose the requirements to make it better [1:05:32] for the residents, but it's not our jurisdiction . [1:05:58] Reinaldo Borges, Chair: As a public official how do you deal [1:06:00] with that, we live in the United States when you buy a property [1:06:04] you have certain rights , and then it affects others that live [1:06:09] in the neighborhood like you being affected. [1:06:13] So how do you legislate to avoid that, you basically [1:06:16] have to put some kind of building moratorium, [1:06:19] and I don't think that's going to happen. [1:06:22] People buy properties, people make investments, [1:06:25] and people have rights you can try to challenge them and go [1:06:30] through the legal process . [1:06:45] if you talk to everyone managing these construction sites, [1:06:49] the superintendents and project managers, [1:06:52] most of their day is spent talking to the front gate [1:06:56] because someone's trying to get in then they have to manage that [1:06:59] and then they've got a big piece of equipment being delivered , [1:07:05] it's like that's what you're living every day in about 30 [1:07:10] active construction sites. [1:07:12] It's stressful, puts the stress on the community. [1:07:16] As you know, there's a lot of Jewish holidays where nothing [1:07:19] happens but it's not enough . [1:07:35] It's a real issue, I don't have any solutions unfortunately . [1:07:51] I would go to the commission . [1:08:11] Speaker: Everything behind the gate [1:08:13] is private streets, the civic Association manages the gate [1:08:16] access, and that's another avenue for you [1:08:19] to communicate about how that is being handled as well. [1:08:27] What other communities are doing is [1:08:30] they require the contractor to present the construction plan, [1:08:35] like on site I'm going to provide parking for 15 cars. [1:08:42] Does that really happen , do contractors really buy a minibus [1:08:50] to transport their crew to the site, that's not very practical. [1:08:54] I don't know what else to say here . [1:09:11] Usually these are 2 to 3 year constructions. [1:09:16] These have changed architects and designers, [1:09:20] owners make changes and they have to get revisions. [1:09:25] We can't control that, it's just the way these things evolve [1:09:33] because people are creative and they have expectations [1:09:36] so it's difficult for us to have any impact [1:09:39] on the schedule or the building official, per se. [1:09:56] Speaker: The mayor would be the avenue through, and then [1:10:00] your community association or even [1:10:03] bring it to the community input whether conditions [1:10:07] are agreed upon. [1:10:27] Reinaldo Borges, Chair: That's happening too [1:10:29] at the state level, they are superseding our authority [1:10:33] to have moratoriums until October 2027. [1:10:45] Speaker: If you go to the first page on the plans, [1:10:47] there's a note of an ordinance you could look at which protects [1:10:50] you . [1:11:18] Speaker: We've made sure every construction site has [1:11:21] a pre-construction meeting for demolition that's part of that [1:11:24] ordinance, we will have that meeting and code enforcement [1:11:28] will be part of it, police department and public works all [1:11:32] part of that meeting to be able to control the access [1:11:40] the vehicles inside the site . [1:11:51] That house has been in construction before I got here, [1:11:53] and I've been here five and a half years. [1:11:57] Keep in mind we can't control that, but just [1:12:01] for peace of mind based on the last communication [1:12:04] we had with that site, supposedly [1:12:08] before the end of September they are going to finish, [1:12:13] that's what they've been telling us. [1:12:17] This could be any time after now this process, [1:12:21] then they have to go through the process of permitting which [1:12:24] could take another month and a half to three months [1:12:27] and then after that they can start construction. [1:12:29] But then, you also have another house across with the other [1:12:36] owner similar to this that got approved 4 or 5 months ago that [1:12:40] is under construction already , that one should be done probably [1:12:49] within 6 to 8 months . [1:12:56] But the other one, it will probably be 2 to 3 years [1:13:02] so unfortunately I cannot control the construction speed [1:13:08] or how they acquire the materials . [1:13:18] We have another one inside the dry lot [1:13:19] has been in construction for more than four years, [1:13:23] but the materials that they picked out [1:13:26] and the lead time they've taken that time, [1:13:29] unfortunately we can't control that. [1:13:32] But I completely understand, if you want we can give you contact [1:13:39] information for the construction and you can see the construction [1:13:46] contractor at the construction meeting and have a point [1:13:50] of contact and hear what we say to them . [1:14:02] To be neighbors you cannot start on the wrong foot, [1:14:04] you have to be pleasant and passionate and not allow [1:14:08] the destruction for the residents of the other [1:14:12] neighborhoods . [1:14:18] Reinaldo Borges, Chair: We get the idea, [1:14:19] we feel your frustration and your pain [1:14:22] and we wish we could do something about it. [1:15:00] Thank you guys. [1:15:11] We have some additional public comments [1:15:15] which I will read into the record, [1:15:17] they are available for the architects to read. [1:15:21] They are very sensible comments , [1:15:27] and then we have public comments from this couple . [1:15:32] We can wrap up the feedback, any more questions? [1:15:40] Speaker: On the north side you have a single access gate access [1:15:44] and no access until you get to the rear yard, [1:15:49] so the courtyard I would imagine there will be kids at some [1:15:52] point, there's kind of a visual barrier pure . [1:16:03] the whole northern 75 by ten feet accessible [1:16:08] except from the right of way or the backyard, [1:16:12] I would just recommend a gate. [1:16:19] Martin Litman: There's a side exit through the gym that is [1:16:23] additional . [1:16:39] The other one, with that garage facing the street and the cars [1:16:45] having to do a 180, can we screen the lights coming back [1:16:51] to the neighbors who just left because normally the headlights [1:16:58] as you are leaving your driveway point down at the street . [1:17:17] Normally on a structured garage they're [1:17:20] going to require some sort of visual barrier [1:17:22] to keep that from happening. [1:17:40] Speaker: Do you have a fresh air intake system for this house? [1:17:49] Martin Litman: We didn't do the mechanical problems yet, [1:17:53] but we always do . [1:18:21] Jose L. Gomez, Board Member: I've been looking at the plans, [1:18:23] and there's a little coordination to be done . [1:18:34] The eyebrow is pretty impressive over already in arch . [1:18:50] Speaker: We have to trust, there isn't a process where you come [1:18:53] back after full design and see things, [1:18:56] it's not going to happen and I think the beauty is that we have [1:19:01] different brains here and we are all kind of giving you our best [1:19:05] thoughts to make sure you find great success . [1:19:11] I think the sign is nicely done and I [1:19:14] think your clients are happy and you've got consistency [1:19:17] in the vocabulary, the material, palette is fantastic. [1:19:21] It's sort of in the execution because we [1:19:25] want to make sure contractors don't [1:19:28] cut corners and things like that, [1:19:30] we wish you good luck on that. [1:19:38] Excellent job, the feedback you're [1:19:40] getting from the neighbors is more [1:19:42] because there's a lot going on, it's a beautiful community [1:19:46] and people get concerned. [1:19:52] Speaker: I feel sympathetic . [1:20:06] Reinaldo Borges, Chair: Let's go forward on this, [1:20:09] anybody wants to make a motion to approve. [1:20:15] That was a, I saw it . [1:20:23] All those in favor say aye. [1:20:27] you've got four yeses and no official written conditions, [1:20:33] we are submitting the comments of the neighbors [1:20:35] for your consideration and wish you the best. [1:20:55] It depends on the quality of the drawings . [1:21:03] I think no other official business, so we are done, [1:21:06] we closed the meeting, no more public comments . [1:21:12] The world is safe, everything's happy, everything's beautiful. [1:21:16] The meeting comes to a close, thank you so much!