1 00:00:00,000 --> 00:00:03,000 That's it. 2 00:00:01,320 --> 00:00:04,880 Great. 3 00:00:03,000 --> 00:00:07,120 All right. Okay, well, maybe I I guess 4 00:00:04,880 --> 00:00:08,920 I'll I'll call to order and start the 5 00:00:07,120 --> 00:00:12,040 meeting. Um 6 00:00:08,920 --> 00:00:14,080 first order is roll call and I'll start 7 00:00:12,040 --> 00:00:15,480 and then we can go around. John Tantum, 8 00:00:14,080 --> 00:00:18,600 I volunteered to be chair of this 9 00:00:15,480 --> 00:00:20,560 committee, a Cove Road resident. 10 00:00:18,600 --> 00:00:22,480 Go ahead, Mr. Isaacson. Sitting in for 11 00:00:20,560 --> 00:00:24,080 Larry Store. 12 00:00:22,480 --> 00:00:26,600 Keith Fagan, a 13 00:00:24,080 --> 00:00:28,000 town resident. Uh Peter Mark, city 14 00:00:26,600 --> 00:00:29,400 council member. I'm going to excuse 15 00:00:28,000 --> 00:00:30,880 myself and get a pen. This one doesn't 16 00:00:29,400 --> 00:00:33,200 work good. 17 00:00:30,880 --> 00:00:33,200 Okay. 18 00:00:34,000 --> 00:00:37,800 Julian Poolweiler with Stetson 19 00:00:35,400 --> 00:00:39,720 Engineers, uh design team for the Beach 20 00:00:37,800 --> 00:00:41,960 Road stabilization project. 21 00:00:39,720 --> 00:00:43,600 Adrian Formaini, both with the city 22 00:00:41,960 --> 00:00:44,480 project management team. 23 00:00:43,600 --> 00:00:46,760 Great. 24 00:00:44,480 --> 00:00:48,120 Tony Boyd, public works director. 25 00:00:46,760 --> 00:00:50,640 Um 26 00:00:48,120 --> 00:00:52,080 and uh the others I I can chime in that 27 00:00:50,640 --> 00:00:54,120 Robert's uh 28 00:00:52,080 --> 00:00:55,480 excused himself from from being here. He 29 00:00:54,120 --> 00:00:58,360 wasn't able to make it, but he is 30 00:00:55,480 --> 00:01:00,720 joining us on Zoom. So, yeah, that's 31 00:00:58,360 --> 00:01:03,200 city manager Robert Zadnik. 32 00:01:00,720 --> 00:01:05,239 Robert, Robert, can you hear us? Are you 33 00:01:03,200 --> 00:01:07,840 on audio? 34 00:01:05,239 --> 00:01:08,880 Uh yeah, hi everyone. Can you hear me? 35 00:01:07,840 --> 00:01:10,320 Yes. 36 00:01:08,880 --> 00:01:11,920 Yeah, can you can you hear us okay, 37 00:01:10,320 --> 00:01:13,400 Robert? 38 00:01:11,920 --> 00:01:14,720 Yes. Yeah, you're coming through loud 39 00:01:13,400 --> 00:01:17,120 and clear. Thanks. 40 00:01:14,720 --> 00:01:17,120 Great. 41 00:01:17,240 --> 00:01:20,280 And I'm Chris Berry, assistant engineer 42 00:01:18,960 --> 00:01:22,800 with the city of Belvedere in the public 43 00:01:20,280 --> 00:01:22,800 works department. 44 00:01:22,840 --> 00:01:25,840 Peter, were you out when 45 00:01:24,440 --> 00:01:27,480 when the 46 00:01:25,840 --> 00:01:27,640 when the call came around to your your 47 00:01:27,480 --> 00:01:30,240 seat? 48 00:01:27,640 --> 00:01:32,440 » You know I said it, Peter. Okay, thanks. 49 00:01:30,240 --> 00:01:34,120 Yeah, um 50 00:01:32,440 --> 00:01:36,160 All right. Okay, well, the next item is 51 00:01:34,120 --> 00:01:39,320 the approval of the minutes from our 52 00:01:36,160 --> 00:01:42,240 prior meeting on February 26th, 53 00:01:39,320 --> 00:01:43,960 uh which are in the packet here and were 54 00:01:42,240 --> 00:01:46,040 distributed earlier. Are there any 55 00:01:43,960 --> 00:01:47,160 comments? 56 00:01:46,040 --> 00:01:50,200 on those? 57 00:01:47,160 --> 00:01:51,520 Happy to make a motion to approve it. 58 00:01:50,200 --> 00:01:54,320 I'll second that. 59 00:01:51,520 --> 00:01:56,520 In favor? I. 60 00:01:54,320 --> 00:01:59,760 Uh the minutes were approved from the 61 00:01:56,520 --> 00:02:02,000 February 26th meeting. 62 00:01:59,760 --> 00:02:04,680 Um 63 00:02:02,000 --> 00:02:06,800 next is the the the matter at hand to 64 00:02:04,680 --> 00:02:09,039 talk about the Beach Road stabilization 65 00:02:06,800 --> 00:02:10,640 project and the bids and reviewing the 66 00:02:09,039 --> 00:02:11,320 bids and 67 00:02:10,640 --> 00:02:13,840 uh 68 00:02:11,320 --> 00:02:15,080 discussing those and hopefully come out 69 00:02:13,840 --> 00:02:16,640 come up with a recommendation for the 70 00:02:15,080 --> 00:02:18,560 city council. 71 00:02:16,640 --> 00:02:21,120 Great. So, maybe Tony, I'll let you take 72 00:02:18,560 --> 00:02:23,000 it take over. Yep, thank you. Yeah, and 73 00:02:21,120 --> 00:02:24,840 um thank you everybody for for being 74 00:02:23,000 --> 00:02:26,320 here once again um 75 00:02:24,840 --> 00:02:28,680 in your time. 76 00:02:26,320 --> 00:02:32,360 And um 77 00:02:28,680 --> 00:02:33,880 this uh this meeting is a follow-up from 78 00:02:32,360 --> 00:02:35,400 our last meeting which really introduced 79 00:02:33,880 --> 00:02:39,320 you all to the to the plans for the 80 00:02:35,400 --> 00:02:42,440 project and uh the context for it. Um 81 00:02:39,320 --> 00:02:44,040 this meeting is to uh present the 82 00:02:42,440 --> 00:02:44,840 selection process 83 00:02:44,040 --> 00:02:49,400 um 84 00:02:44,840 --> 00:02:53,000 uh to you all and uh basically um 85 00:02:49,400 --> 00:02:56,400 uh request a recommendation uh that the 86 00:02:53,000 --> 00:02:57,840 city council approve uh the the contract 87 00:02:56,400 --> 00:03:01,640 uh for the for the project and award the 88 00:02:57,840 --> 00:03:03,640 contract uh to a contractor. Um 89 00:03:01,640 --> 00:03:06,400 and so, what I'll be doing is I'll walk 90 00:03:03,640 --> 00:03:09,200 you through the selection process um 91 00:03:06,400 --> 00:03:11,120 and we are uh I think it's fairly 92 00:03:09,200 --> 00:03:14,600 informal. We can, you know, discuss and 93 00:03:11,120 --> 00:03:17,440 ask questions as we go. And um yeah, 94 00:03:14,600 --> 00:03:20,120 happy to fill you in on on any of the of 95 00:03:17,440 --> 00:03:20,120 the details. 96 00:03:20,680 --> 00:03:25,640 All right. So, um 97 00:03:23,200 --> 00:03:28,292 so, to start with I'd like to clarify in 98 00:03:25,640 --> 00:03:28,520 my memo um 99 00:03:28,292 --> 00:03:31,480 » [clears throat] 100 00:03:28,520 --> 00:03:34,080 » Uh that because I didn't point this out 101 00:03:31,480 --> 00:03:36,120 in the memo. Um this contract is for the 102 00:03:34,080 --> 00:03:38,680 sheet pile installation portion of the 103 00:03:36,120 --> 00:03:40,760 project, which is the main uh the sort 104 00:03:38,680 --> 00:03:42,240 of the meat of the project. Uh there is 105 00:03:40,760 --> 00:03:44,000 another um 106 00:03:42,240 --> 00:03:45,520 segment which it which has to do with 107 00:03:44,000 --> 00:03:48,360 the the private properties on Beach 108 00:03:45,520 --> 00:03:52,000 Road, number 16 uh to number 28 Beach 109 00:03:48,360 --> 00:03:54,400 Road, um where there are gangways and 110 00:03:52,000 --> 00:03:55,880 utilities on on the properties there 111 00:03:54,400 --> 00:03:57,800 that will need to be removed for the 112 00:03:55,880 --> 00:03:59,080 installation of the pre of the of the 113 00:03:57,800 --> 00:04:01,280 sheet piles. 114 00:03:59,080 --> 00:04:03,520 And that's a project in itself. Um and 115 00:04:01,280 --> 00:04:05,720 so, that will be a a separate contract. 116 00:04:03,520 --> 00:04:07,400 Um 117 00:04:05,720 --> 00:04:09,760 And there there's a little bit of 118 00:04:07,400 --> 00:04:11,600 possible confusion with with uh with the 119 00:04:09,760 --> 00:04:13,680 numbers that that amount was included in 120 00:04:11,600 --> 00:04:14,240 the engineer's estimates um 121 00:04:13,680 --> 00:04:15,680 uh 122 00:04:14,240 --> 00:04:18,120 you know, and and that's not really I I 123 00:04:15,680 --> 00:04:19,959 didn't really um clarify that or point 124 00:04:18,120 --> 00:04:21,320 that out in the memo. 125 00:04:19,959 --> 00:04:24,200 Um 126 00:04:21,320 --> 00:04:26,760 and yeah, we we can we can look at it 127 00:04:24,200 --> 00:04:29,280 more closely uh but uh exhibit C, the 128 00:04:26,760 --> 00:04:30,080 engineer's estimate will will show 129 00:04:29,280 --> 00:04:32,560 uh 130 00:04:30,080 --> 00:04:34,720 that uh where that that line was 131 00:04:32,560 --> 00:04:37,400 included in the total cost of of the 132 00:04:34,720 --> 00:04:38,600 estimate versus the cost of this 133 00:04:37,400 --> 00:04:40,160 proposal. 134 00:04:38,600 --> 00:04:42,240 Um 135 00:04:40,160 --> 00:04:46,040 and 136 00:04:42,240 --> 00:04:47,720 yeah, if need be um I could also 137 00:04:46,040 --> 00:04:49,040 it'll take me a few minutes, but at some 138 00:04:47,720 --> 00:04:51,360 point I did 139 00:04:49,040 --> 00:04:53,920 uh pull up uh some of these documents 140 00:04:51,360 --> 00:04:55,440 onto the screen if it's helpful. 141 00:04:53,920 --> 00:04:56,840 And Robert might find that 142 00:04:55,440 --> 00:05:00,560 that useful. 143 00:04:56,840 --> 00:05:02,760 Um okay. Um so, the RFP was posted on 144 00:05:00,560 --> 00:05:04,960 February 20th. 145 00:05:02,760 --> 00:05:08,120 There was a lot of interest um it seemed 146 00:05:04,960 --> 00:05:11,040 to us with uh 58 downloads of uh of the 147 00:05:08,120 --> 00:05:13,160 RFP materials. Um 148 00:05:11,040 --> 00:05:15,120 uh it gives some indication, I guess, of 149 00:05:13,160 --> 00:05:16,840 of uh all the contractors out there and 150 00:05:15,120 --> 00:05:17,920 and who are kind of perusing the sites 151 00:05:16,840 --> 00:05:18,640 and 152 00:05:17,920 --> 00:05:20,280 uh 153 00:05:18,640 --> 00:05:21,560 interested to see what what projects are 154 00:05:20,280 --> 00:05:22,440 going on. 155 00:05:21,560 --> 00:05:24,240 Um 156 00:05:22,440 --> 00:05:26,480 that was followed by a mandatory site 157 00:05:24,240 --> 00:05:27,800 meeting uh with with prospective 158 00:05:26,480 --> 00:05:30,200 contractors. 159 00:05:27,800 --> 00:05:32,080 Um so, any contractor who wanted to 160 00:05:30,200 --> 00:05:33,400 submit a bid would have to be at the at 161 00:05:32,080 --> 00:05:35,480 the site meeting. 162 00:05:33,400 --> 00:05:36,520 Uh there were 14 companies represented 163 00:05:35,480 --> 00:05:40,160 there. 164 00:05:36,520 --> 00:05:42,640 Um and the deadline for questions 165 00:05:40,160 --> 00:05:45,800 following that was March 9th. Um we 166 00:05:42,640 --> 00:05:49,480 received four questions in writing 167 00:05:45,800 --> 00:05:52,080 and responded to in in in an addendum. 168 00:05:49,480 --> 00:05:55,200 Um there were two adden- addenda issued. 169 00:05:52,080 --> 00:05:56,920 Uh the first addendum was um 170 00:05:55,200 --> 00:05:58,480 a change to the insurance requirements 171 00:05:56,920 --> 00:06:01,280 in the contract. 172 00:05:58,480 --> 00:06:03,760 Um so, that uh yeah, basically uh 173 00:06:01,280 --> 00:06:06,240 provided uh the details of that. 174 00:06:03,760 --> 00:06:08,560 Um and then addendum two um 175 00:06:06,240 --> 00:06:10,800 uh provided details on the on the uh 176 00:06:08,560 --> 00:06:13,080 pre-bid meeting, um 177 00:06:10,800 --> 00:06:14,880 the questions received, um the responses 178 00:06:13,080 --> 00:06:16,840 to those questions, and also a 179 00:06:14,880 --> 00:06:19,320 clarification of of some of the uh 180 00:06:16,840 --> 00:06:21,280 contractor's responsibilities uh during 181 00:06:19,320 --> 00:06:23,800 during the project um 182 00:06:21,280 --> 00:06:26,200 related to workflow, their workflow, and 183 00:06:23,800 --> 00:06:29,640 coordination. 184 00:06:26,200 --> 00:06:32,040 The deadline was March the 19th um 185 00:06:29,640 --> 00:06:34,320 and that was uh attended by four 186 00:06:32,040 --> 00:06:36,320 different contractors' representatives 187 00:06:34,320 --> 00:06:39,880 uh as well as a union representative 188 00:06:36,320 --> 00:06:42,520 representative. Um A union from 189 00:06:39,880 --> 00:06:44,640 local three. Operators. It's not 190 00:06:42,520 --> 00:06:48,320 uncommon that they show up knowing about 191 00:06:44,640 --> 00:06:50,360 this type of projects. Yeah, thank you. 192 00:06:48,320 --> 00:06:51,880 Thanks, I wouldn't have known that. 193 00:06:50,360 --> 00:06:53,240 Um 194 00:06:51,880 --> 00:06:55,680 and then 195 00:06:53,240 --> 00:06:58,320 uh yeah, so and it was fairly 196 00:06:55,680 --> 00:07:01,120 straightforward. Each uh each envelope 197 00:06:58,320 --> 00:07:03,280 each sealed envelope was opened and the 198 00:07:01,120 --> 00:07:05,440 bids uh bid amount was was read out 199 00:07:03,280 --> 00:07:07,760 loud. Um 200 00:07:05,440 --> 00:07:11,040 uh people people, you know, took notes 201 00:07:07,760 --> 00:07:12,480 and uh and then asked some questions. Um 202 00:07:11,040 --> 00:07:13,320 most of the questions, I think all the 203 00:07:12,480 --> 00:07:15,520 questions were 204 00:07:13,320 --> 00:07:17,400 » So, they they they opened up their bids 205 00:07:15,520 --> 00:07:20,120 amongst all the other competitors? 206 00:07:17,400 --> 00:07:21,560 Yeah, so basically we received the bids 207 00:07:20,120 --> 00:07:22,920 um at a table we had a little table 208 00:07:21,560 --> 00:07:25,400 stationed next to the door there. As 209 00:07:22,920 --> 00:07:26,480 they came in, uh they they uh handed in 210 00:07:25,400 --> 00:07:29,760 their bid 211 00:07:26,480 --> 00:07:31,880 um and then um at the designated time 212 00:07:29,760 --> 00:07:35,560 which was 11:30 on that day, 213 00:07:31,880 --> 00:07:37,920 um we declared that uh bids were now uh 214 00:07:35,560 --> 00:07:39,760 closed and then uh and then we stood up 215 00:07:37,920 --> 00:07:41,600 at a at a table and opened each bid 216 00:07:39,760 --> 00:07:43,960 individually, pulled out the the 217 00:07:41,600 --> 00:07:46,920 documents, and read out the number to 218 00:07:43,960 --> 00:07:48,520 the to the uh the contractors. Is that 219 00:07:46,920 --> 00:07:50,200 is that a requirement? So, is that a 220 00:07:48,520 --> 00:07:51,040 requirement? It is the It's a law. I'm 221 00:07:50,200 --> 00:07:52,080 sorry, I didn't mean to speak over you. 222 00:07:51,040 --> 00:07:53,760 Yeah, that's right. Yeah, that was that 223 00:07:52,080 --> 00:07:55,400 is the procedure for 224 00:07:53,760 --> 00:07:56,600 uh public opening. And it sort of takes 225 00:07:55,400 --> 00:07:58,000 away your ability to negotiate with 226 00:07:56,600 --> 00:08:03,040 anybody. 227 00:07:58,000 --> 00:08:05,680 It does and the law it's it's it's uh 228 00:08:03,040 --> 00:08:07,360 it's a legal requirement for for public 229 00:08:05,680 --> 00:08:08,800 agencies. Um 230 00:08:07,360 --> 00:08:12,080 and and 231 00:08:08,800 --> 00:08:13,800 the the possibility to negotiate um 232 00:08:12,080 --> 00:08:17,600 is actually extremely limited. I mean, 233 00:08:13,800 --> 00:08:19,520 the the the amount on the bid uh if the 234 00:08:17,600 --> 00:08:20,400 city is to accept a bid, 235 00:08:19,520 --> 00:08:22,440 um 236 00:08:20,400 --> 00:08:25,080 it has to justify not accepting the 237 00:08:22,440 --> 00:08:27,320 lowest bid, basically. Um if it's not 238 00:08:25,080 --> 00:08:30,440 going to accept the the lowest bid, um 239 00:08:27,320 --> 00:08:31,840 there there needs to be a reason in, you 240 00:08:30,440 --> 00:08:34,200 know, um 241 00:08:31,840 --> 00:08:36,320 uh that the city would would do that. I 242 00:08:34,200 --> 00:08:37,719 mean, it's very seldom that that a city 243 00:08:36,320 --> 00:08:39,360 would want to not [clears throat] accept 244 00:08:37,719 --> 00:08:41,080 the lowest bid. But but is there is 245 00:08:39,360 --> 00:08:41,800 there I'm sorry to meet you. 246 00:08:41,080 --> 00:08:43,760 » No, no. 247 00:08:41,800 --> 00:08:46,320 Just just 248 00:08:43,760 --> 00:08:48,760 couple questions. So, you went from 58 249 00:08:46,320 --> 00:08:50,480 downloads, I guess, I know it's a it's a 250 00:08:48,760 --> 00:08:52,800 gross number um 251 00:08:50,480 --> 00:08:54,520 to 14 visits and four 252 00:08:52,800 --> 00:08:56,720 made meeting the deadline. Did anybody 253 00:08:54,520 --> 00:08:58,360 come in after the deadline? Um which I 254 00:08:56,720 --> 00:09:00,360 know you you need to exclude, but I'm 255 00:08:58,360 --> 00:09:01,040 saying anybody come in just for 256 00:09:00,360 --> 00:09:02,760 information. 257 00:09:01,040 --> 00:09:03,120 » No, no, nobody came in after the 258 00:09:02,760 --> 00:09:04,680 deadline. 259 00:09:03,120 --> 00:09:06,800 » Normal or why would you think you'd go 260 00:09:04,680 --> 00:09:09,000 from 58 to 14? I I understand a 58 to 261 00:09:06,800 --> 00:09:10,600 14, but 14 to four seems a larger jump 262 00:09:09,000 --> 00:09:12,240 than I would expect. I'll go over the 263 00:09:10,600 --> 00:09:14,240 bats and then I'll and then I'll let 264 00:09:12,240 --> 00:09:16,200 I'll let you Adrian chime in. He's 265 00:09:14,240 --> 00:09:17,360 definitely um 266 00:09:16,200 --> 00:09:19,640 kind of written a few more of these 267 00:09:17,360 --> 00:09:22,480 rodeos than I have. Um but 268 00:09:19,640 --> 00:09:24,920 um I think uh one of the main reasons 269 00:09:22,480 --> 00:09:27,920 was there was this a specific piece of 270 00:09:24,920 --> 00:09:30,920 equipment that was um specified in the 271 00:09:27,920 --> 00:09:34,000 RFP and and uh and that was this uh 272 00:09:30,920 --> 00:09:36,520 silent piler, this guy can machine. And 273 00:09:34,000 --> 00:09:38,800 there are very few uh if 274 00:09:36,520 --> 00:09:39,800 if any, I think, in Northern California 275 00:09:38,800 --> 00:09:42,720 um 276 00:09:39,800 --> 00:09:43,920 uh companies that that provide that. Um 277 00:09:42,720 --> 00:09:45,480 so, 278 00:09:43,920 --> 00:09:47,880 you know, that was another thing is that 279 00:09:45,480 --> 00:09:49,800 all of them had the same subcontractor 280 00:09:47,880 --> 00:09:50,360 uh to drive these piles in. 281 00:09:49,800 --> 00:09:52,280 Um 282 00:09:50,360 --> 00:09:54,720 and I think yeah, some of the comments 283 00:09:52,280 --> 00:09:56,320 at the pre-bid meeting um 284 00:09:54,720 --> 00:09:57,920 related to that. They they sort of said, 285 00:09:56,320 --> 00:09:59,240 well, I mean, if we're all going to have 286 00:09:57,920 --> 00:10:00,760 the same prime I mean, if we're all 287 00:09:59,240 --> 00:10:01,640 going to have the same sub, 288 00:10:00,760 --> 00:10:02,840 um 289 00:10:01,640 --> 00:10:04,840 what difference does it make to you 290 00:10:02,840 --> 00:10:06,200 guys? And so, I think a lot of people 291 00:10:04,840 --> 00:10:08,520 felt that they wouldn't have a 292 00:10:06,200 --> 00:10:10,880 competitive chance. So, you know, so 293 00:10:08,520 --> 00:10:14,280 didn't didn't want to waste their time. 294 00:10:10,880 --> 00:10:17,000 Um but yeah, Adrian Yeah. So, uh you 295 00:10:14,280 --> 00:10:19,280 know, it was certainly a great turnout 296 00:10:17,000 --> 00:10:21,920 at the pre-bid versus who pulled plans. 297 00:10:19,280 --> 00:10:23,880 And who pulled plans could be a host of 298 00:10:21,920 --> 00:10:25,360 individuals that may actually not even 299 00:10:23,880 --> 00:10:27,200 have any 300 00:10:25,360 --> 00:10:28,720 ultimate goal of bidding on the project. 301 00:10:27,200 --> 00:10:31,280 However, they are very interested 302 00:10:28,720 --> 00:10:32,720 whether it be a vendor. Uh there are 303 00:10:31,280 --> 00:10:35,120 several 304 00:10:32,720 --> 00:10:37,280 uh communication 305 00:10:35,120 --> 00:10:40,400 uh companies that will track projects 306 00:10:37,280 --> 00:10:42,840 and then, you know, post items. Um so, 307 00:10:40,400 --> 00:10:45,000 you usually have a very broad spectrum 308 00:10:42,840 --> 00:10:46,880 of individuals that will pull plans and 309 00:10:45,000 --> 00:10:48,880 and anyone's allowed to do it. So, then 310 00:10:46,880 --> 00:10:51,680 you get down to the pre-bid meeting, 311 00:10:48,880 --> 00:10:53,720 which is certainly a more uh fine-tuned 312 00:10:51,680 --> 00:10:57,480 group of individuals 313 00:10:53,720 --> 00:10:59,360 that still may consist of additional 314 00:10:57,480 --> 00:11:02,360 individuals outside of who will be 315 00:10:59,360 --> 00:11:04,120 bidding on the project. Myself signed in 316 00:11:02,360 --> 00:11:05,360 on the pre-bid sheet because I was an 317 00:11:04,120 --> 00:11:07,200 attendee. 318 00:11:05,360 --> 00:11:09,040 Um my project manager Kyle, you know, 319 00:11:07,200 --> 00:11:11,480 Tony. So, there were 320 00:11:09,040 --> 00:11:12,760 others at the pre-bid that necessarily 321 00:11:11,480 --> 00:11:15,240 weren't going to be bidding on the 322 00:11:12,760 --> 00:11:17,720 project including subcontractors 323 00:11:15,240 --> 00:11:20,160 to potential primes. 324 00:11:17,720 --> 00:11:22,320 So, one of the critical uh 325 00:11:20,160 --> 00:11:25,000 subcontractors and at that point we 326 00:11:22,320 --> 00:11:28,080 weren't sure if there was a 327 00:11:25,000 --> 00:11:30,400 uh a prime or a subcontracting component 328 00:11:28,080 --> 00:11:33,160 to the uh company that does retain 329 00:11:30,400 --> 00:11:34,640 several of these Dyken silent pilers. 330 00:11:33,160 --> 00:11:36,240 And they were, you know, there with 331 00:11:34,640 --> 00:11:37,600 three individuals, you know, that are 332 00:11:36,240 --> 00:11:41,280 all from Blue Iron. So, that's how your 333 00:11:37,600 --> 00:11:41,280 list kind of kind of kind of 334 00:11:42,560 --> 00:11:45,760 that we ended up with? Is that a 335 00:11:43,680 --> 00:11:47,640 successful process or would we wish we'd 336 00:11:45,760 --> 00:11:49,880 had more or what what how do we how do 337 00:11:47,640 --> 00:11:52,480 you evaluate that? Exactly. Yes. So, 338 00:11:49,880 --> 00:11:55,560 good question. So, because of the uh 339 00:11:52,480 --> 00:11:58,120 selective equipment for installation, 340 00:11:55,560 --> 00:12:00,360 these contractors all knew that Blue 341 00:11:58,120 --> 00:12:02,760 Iron was going to be 342 00:12:00,360 --> 00:12:04,640 involved with this contract. You can 343 00:12:02,760 --> 00:12:06,040 only make the case Blue Iron's you know, 344 00:12:04,640 --> 00:12:08,720 selected who they who they want to work 345 00:12:06,040 --> 00:12:10,360 with. Correct. So, we do know based on 346 00:12:08,720 --> 00:12:12,600 the bid results that Blue Iron so 347 00:12:10,360 --> 00:12:14,880 provided numbers to several contractors 348 00:12:12,600 --> 00:12:16,760 and that's great. And all of them were 349 00:12:14,880 --> 00:12:18,880 very close on that one particular bid 350 00:12:16,760 --> 00:12:20,080 item when we analyzed the results. 351 00:12:18,880 --> 00:12:21,600 » But they're not though. But they're not 352 00:12:20,080 --> 00:12:22,600 though. I mean, unless it's embedded in 353 00:12:21,600 --> 00:12:24,720 these lines. I mean, there's there's 354 00:12:22,600 --> 00:12:26,680 there's quite a big of variance in the, 355 00:12:24,720 --> 00:12:27,760 you know, uh line five, six, seven, and 356 00:12:26,680 --> 00:12:28,800 eight. 357 00:12:27,760 --> 00:12:30,720 You would think you would think if it's 358 00:12:28,800 --> 00:12:32,360 the same contractor between the same The 359 00:12:30,720 --> 00:12:33,080 contractor is this the opinion of cost 360 00:12:32,360 --> 00:12:34,280 for the 361 00:12:33,080 --> 00:12:36,080 project? I'm just looking at the 362 00:12:34,280 --> 00:12:36,960 line-by-line breakdown. Must be in the 363 00:12:36,080 --> 00:12:38,600 bid 364 00:12:36,960 --> 00:12:39,839 Okay. Yeah, so that's a computer too. 365 00:12:38,600 --> 00:12:42,120 I'm sure it's in a more detailed 366 00:12:39,839 --> 00:12:44,120 tabulation. But but you know, where you 367 00:12:42,120 --> 00:12:45,520 would where you would expect to see 368 00:12:44,120 --> 00:12:47,520 So, I'm I'm my bad. I'm sorry. I didn't 369 00:12:45,520 --> 00:12:49,560 have a thought that was on the one Where 370 00:12:47,520 --> 00:12:51,040 you would expect to see some consistency 371 00:12:49,560 --> 00:12:52,720 among them all 372 00:12:51,040 --> 00:12:54,160 would be alignment A, alignment A, 373 00:12:52,720 --> 00:12:55,520 alignment B, alignment C, you know, 374 00:12:54,160 --> 00:12:57,960 where this where where the the 375 00:12:55,520 --> 00:12:59,080 structural steel um sheet piles are 376 00:12:57,960 --> 00:13:00,760 being driven. You know, basically line 377 00:12:59,080 --> 00:13:01,839 five, six, and seven. 378 00:13:00,760 --> 00:13:05,080 Um 379 00:13:01,839 --> 00:13:05,080 and part of I guess 380 00:13:05,480 --> 00:13:07,800 Yeah. I don't know what I'm seeing right 381 00:13:06,560 --> 00:13:10,040 now, but 382 00:13:07,800 --> 00:13:11,800 To jump in, I'm I I I 100% see what 383 00:13:10,040 --> 00:13:14,360 you're saying and it is a bit of a head 384 00:13:11,800 --> 00:13:15,839 head scratcher about why Valentine 385 00:13:14,360 --> 00:13:18,480 uh uh 386 00:13:15,839 --> 00:13:20,760 have 2.3 million whereas the other 387 00:13:18,480 --> 00:13:24,320 contractors I think are more 388 00:13:20,760 --> 00:13:27,280 closely um converged at, you know, 389 00:13:24,320 --> 00:13:30,360 between 1.6 390 00:13:27,280 --> 00:13:31,040 and and 1.8 million. Quick question. Are 391 00:13:30,360 --> 00:13:32,320 uh are 392 00:13:31,040 --> 00:13:34,560 are we we're in at this point we're not 393 00:13:32,320 --> 00:13:37,280 even discussing Valentine's numbers or 394 00:13:34,560 --> 00:13:39,280 do you want to discuss their I mean, 395 00:13:37,280 --> 00:13:40,760 they're they're they're way high. No, 396 00:13:39,280 --> 00:13:42,280 no, no, I know. I know. I know. I'm I'm 397 00:13:40,760 --> 00:13:44,240 I mean, well, just just with four on the 398 00:13:42,280 --> 00:13:46,400 page and I you may want to just mention 399 00:13:44,240 --> 00:13:48,200 why you knocked out Corcus. 400 00:13:46,400 --> 00:13:50,040 Yes. Yeah. Yeah, definitely. I was 401 00:13:48,200 --> 00:13:50,880 coming to that. Yeah. 402 00:13:50,040 --> 00:13:52,000 Yeah, so 403 00:13:50,880 --> 00:13:53,280 they knocked out Corcus. They didn't 404 00:13:52,000 --> 00:13:54,200 they didn't really follow the process. 405 00:13:53,280 --> 00:13:56,080 Yeah, we can we can look at the 406 00:13:54,200 --> 00:13:57,240 administrative oversight by Corcus and 407 00:13:56,080 --> 00:13:59,320 they just forgot to sign something or 408 00:13:57,240 --> 00:14:00,640 was it like a substantial 409 00:13:59,320 --> 00:14:02,640 they didn't 410 00:14:00,640 --> 00:14:04,960 complete something important? Uh it was 411 00:14:02,640 --> 00:14:07,440 an it was I think 412 00:14:04,960 --> 00:14:10,880 I if it was me, if it was my company, 413 00:14:07,440 --> 00:14:13,440 I'd be very frustrated uh because um 414 00:14:10,880 --> 00:14:15,280 it is it's it's a very minor 415 00:14:13,440 --> 00:14:16,360 detail when you're filling out a form, 416 00:14:15,280 --> 00:14:20,760 but 417 00:14:16,360 --> 00:14:22,600 in in an RFP um it's it's significant 418 00:14:20,760 --> 00:14:25,680 um and 419 00:14:22,600 --> 00:14:26,800 uh it basically 420 00:14:25,680 --> 00:14:29,120 um 421 00:14:26,800 --> 00:14:31,720 The frustration for us too is that um we 422 00:14:29,120 --> 00:14:33,560 we were aware that Corcus had downloaded 423 00:14:31,720 --> 00:14:35,320 those those addenda 424 00:14:33,560 --> 00:14:37,000 um and 425 00:14:35,320 --> 00:14:39,240 so when they when they filled in their 426 00:14:37,000 --> 00:14:41,200 form um saying that they had not they 427 00:14:39,240 --> 00:14:43,560 they did not acknowledge uh the the 428 00:14:41,200 --> 00:14:45,320 addenda basically. I mean, but but but 429 00:14:43,560 --> 00:14:47,240 in the city's defense and our in our 430 00:14:45,320 --> 00:14:49,160 broader legal defense of this is also 431 00:14:47,240 --> 00:14:50,520 that when and if 432 00:14:49,160 --> 00:14:52,320 they're they're not acknowledging those 433 00:14:50,520 --> 00:14:53,600 two addenda which we we we can't verify 434 00:14:52,320 --> 00:14:54,920 that it's in their their their budget 435 00:14:53,600 --> 00:14:56,079 data and and they'll perform the work 436 00:14:54,920 --> 00:14:58,160 according to the specs that you laid 437 00:14:56,079 --> 00:14:59,520 out. Exactly. What's your real change? 438 00:14:58,160 --> 00:15:00,880 Which is why you have to sort of 439 00:14:59,520 --> 00:15:03,360 eliminate that. 440 00:15:00,880 --> 00:15:06,160 There's no way to have them acknowledge 441 00:15:03,360 --> 00:15:08,320 the addenda after the fact. It was too 442 00:15:06,160 --> 00:15:10,560 late at that point after the envelopes 443 00:15:08,320 --> 00:15:13,079 have been opened. Is that right? It you 444 00:15:10,560 --> 00:15:14,560 know, it's 445 00:15:13,079 --> 00:15:16,200 It would have been basically, yeah. I 446 00:15:14,560 --> 00:15:19,079 think that would have resulted in 447 00:15:16,200 --> 00:15:20,360 protest from from the other bidders um 448 00:15:19,079 --> 00:15:22,959 basically that they didn't follow 449 00:15:20,360 --> 00:15:24,520 procedures and then were being given an 450 00:15:22,959 --> 00:15:26,400 allowance for 451 00:15:24,520 --> 00:15:27,720 you know, to to correct items in their 452 00:15:26,400 --> 00:15:28,720 in their bid. 453 00:15:27,720 --> 00:15:31,600 Um 454 00:15:28,720 --> 00:15:33,200 Yeah. And you know, I mean, I think 455 00:15:31,600 --> 00:15:34,440 ultimately um 456 00:15:33,200 --> 00:15:36,079 you know, the city attorney weighed in 457 00:15:34,440 --> 00:15:38,839 on it and and uh 458 00:15:36,079 --> 00:15:40,600 yeah, it it was quite clear that uh this 459 00:15:38,839 --> 00:15:43,120 was the only option. 460 00:15:40,600 --> 00:15:45,120 Yeah. Um 461 00:15:43,120 --> 00:15:47,280 Luckily for us the the next the next 462 00:15:45,120 --> 00:15:49,720 bidder was was a very close in price and 463 00:15:47,280 --> 00:15:52,000 they, you know, for the total. 464 00:15:49,720 --> 00:15:54,640 I mean, but on those my question was a 465 00:15:52,000 --> 00:15:56,240 lot of those install sheet pile. Yeah, 466 00:15:54,640 --> 00:15:57,920 you go from 467 00:15:56,240 --> 00:15:59,920 even if you take out Valentine, you 468 00:15:57,920 --> 00:16:03,040 know, there's a six there's a $300,000 469 00:15:59,920 --> 00:16:07,000 swing on line five. 470 00:16:03,040 --> 00:16:09,240 Between between between Thompson and and 471 00:16:07,000 --> 00:16:10,480 Gordon Gordon Mhm. And and Thompson 472 00:16:09,240 --> 00:16:12,200 being the third. That's why they were in 473 00:16:10,480 --> 00:16:14,240 third place. No, no, no, but I'm saying 474 00:16:12,200 --> 00:16:15,400 but if if if the same subcontractor is 475 00:16:14,240 --> 00:16:16,640 providing the service, maybe there's 476 00:16:15,400 --> 00:16:18,800 more detail that that there that I'm not 477 00:16:16,640 --> 00:16:22,360 seeing. Because they are carrying costs 478 00:16:18,800 --> 00:16:24,560 of unforeseen to for covering a sub. So, 479 00:16:22,360 --> 00:16:27,160 guaranteed Thompson is a more local 480 00:16:24,560 --> 00:16:30,520 contractor from Nevada and they may or 481 00:16:27,160 --> 00:16:32,880 may not have worked with um um Blue Iron 482 00:16:30,520 --> 00:16:35,360 as much, but I do know that both Corcus 483 00:16:32,880 --> 00:16:37,520 and Gordon Ball both 484 00:16:35,360 --> 00:16:39,040 work with them quite often and that is 485 00:16:37,520 --> 00:16:42,440 probably that is a reflection in Gordon 486 00:16:39,040 --> 00:16:44,680 Ball's number is that they have a very 487 00:16:42,440 --> 00:16:47,480 good understanding and operation for 488 00:16:44,680 --> 00:16:50,760 their subcontractor which is carrying, 489 00:16:47,480 --> 00:16:51,959 you know, 75% of this this project 490 00:16:50,760 --> 00:16:54,280 weight here. 491 00:16:51,959 --> 00:16:57,040 Um that is the way I see it. 492 00:16:54,280 --> 00:16:59,160 What a really good question. Um what is 493 00:16:57,040 --> 00:17:00,880 the ultimate nature of our agreement 494 00:16:59,160 --> 00:17:03,800 with this contractor? Is it a guaranteed 495 00:17:00,880 --> 00:17:07,040 max? What factors you you mentioned that 496 00:17:03,800 --> 00:17:08,120 in your review of um 497 00:17:07,040 --> 00:17:10,439 uh 498 00:17:08,120 --> 00:17:11,800 references that one of the one of the 499 00:17:10,439 --> 00:17:13,240 things you got back about Gordon Ball in 500 00:17:11,800 --> 00:17:14,520 particular was that they were able to 501 00:17:13,240 --> 00:17:17,120 finish the project on time and on 502 00:17:14,520 --> 00:17:17,120 budget. 503 00:17:17,640 --> 00:17:19,640 What 504 00:17:18,560 --> 00:17:21,640 what are the opportunities or what are 505 00:17:19,640 --> 00:17:23,079 the negative opportunities to be off 506 00:17:21,640 --> 00:17:24,679 budget for us? I mean, 507 00:17:23,079 --> 00:17:27,160 if is this a guaranteed max? Is this a 508 00:17:24,679 --> 00:17:28,760 fixed price? What happens 509 00:17:27,160 --> 00:17:30,480 um certainly I understand client driven 510 00:17:28,760 --> 00:17:32,400 change orders or or or material driven 511 00:17:30,480 --> 00:17:33,720 change orders, but is that what can can 512 00:17:32,400 --> 00:17:36,560 can can drive this into an overage 513 00:17:33,720 --> 00:17:38,720 situation? Yes. And and it's really and 514 00:17:36,560 --> 00:17:39,960 and Adrian definitely please do chime in 515 00:17:38,720 --> 00:17:40,880 here, but 516 00:17:39,960 --> 00:17:42,760 um 517 00:17:40,880 --> 00:17:44,400 my understanding is that 518 00:17:42,760 --> 00:17:46,800 uh they based their 519 00:17:44,400 --> 00:17:49,960 their their estimates of of costs or 520 00:17:46,800 --> 00:17:49,960 their their price 521 00:17:50,880 --> 00:17:54,160 on the If if other 522 00:17:52,960 --> 00:17:57,040 you know, if they get out to the sites 523 00:17:54,160 --> 00:17:59,040 and and um you know, they start digging 524 00:17:57,040 --> 00:18:00,920 and there's something something else 525 00:17:59,040 --> 00:18:03,280 down there than other than loose sand 526 00:18:00,920 --> 00:18:05,760 and rock, for example, um that causes 527 00:18:03,280 --> 00:18:08,480 delays and 528 00:18:05,760 --> 00:18:11,400 you know, changes um then then costs can 529 00:18:08,480 --> 00:18:11,400 change. Yeah. 530 00:18:12,000 --> 00:18:16,360 Yeah. Most of them Yeah, and then some 531 00:18:13,920 --> 00:18:18,440 of the units are are are stated you have 532 00:18:16,360 --> 00:18:21,040 you do a square foot for the sheet pile, 533 00:18:18,440 --> 00:18:23,760 but primarily they are either single 534 00:18:21,040 --> 00:18:26,560 units or total and or, you know, lump 535 00:18:23,760 --> 00:18:28,520 sum. So, each the only the square 536 00:18:26,560 --> 00:18:29,760 footage is on the the sheet pile, which 537 00:18:28,520 --> 00:18:31,240 is total. 538 00:18:29,760 --> 00:18:34,080 And then it's a furnish and install, so 539 00:18:31,240 --> 00:18:35,320 it's a completed system. I mean, Jason 540 00:18:34,080 --> 00:18:36,960 repair that was completed a few years 541 00:18:35,320 --> 00:18:40,400 ago. Were there many change orders 542 00:18:36,960 --> 00:18:43,640 associated with that project? Not one. 543 00:18:40,400 --> 00:18:45,880 And did it come in on budget? Uh well, 544 00:18:43,640 --> 00:18:48,400 that one was a little There was there it 545 00:18:45,880 --> 00:18:50,800 was not the same development of that 546 00:18:48,400 --> 00:18:53,200 project based on the situation because 547 00:18:50,800 --> 00:18:55,720 it was more of a observation that was 548 00:18:53,200 --> 00:18:58,560 made with both and Miller Pacific during 549 00:18:55,720 --> 00:19:01,440 and Stetson during the H and H study in 550 00:18:58,560 --> 00:19:03,080 2019 for the shoreline resiliency for 551 00:19:01,440 --> 00:19:04,720 both shoreline and 552 00:19:03,080 --> 00:19:07,280 Santa Paula and Beach. 553 00:19:04,720 --> 00:19:09,720 Uh so, that was when it was prompted and 554 00:19:07,280 --> 00:19:11,560 the wall was showing uh significant 555 00:19:09,720 --> 00:19:13,880 signs of failure. So, that was what 556 00:19:11,560 --> 00:19:16,640 prompted that project. So, it certainly 557 00:19:13,880 --> 00:19:19,000 was in line with pricing 558 00:19:16,640 --> 00:19:20,679 um and there was no additional inflated 559 00:19:19,000 --> 00:19:22,960 costs due to a 560 00:19:20,679 --> 00:19:24,640 you know, expedited, you know, time 561 00:19:22,960 --> 00:19:26,960 frame. Blue Iron came in well under 562 00:19:24,640 --> 00:19:29,679 because they had a unique perspective on 563 00:19:26,960 --> 00:19:32,679 the installation of sheet with uh 564 00:19:29,679 --> 00:19:32,679 um just cutting edge tech 565 00:19:32,720 --> 00:19:36,159 you know, so 566 00:19:34,120 --> 00:19:38,840 they were we were able to complete the 567 00:19:36,159 --> 00:19:41,240 project faster than other companies. 568 00:19:38,840 --> 00:19:43,440 So And can you confirm my understanding 569 00:19:41,240 --> 00:19:45,600 as well that it's it it would go both 570 00:19:43,440 --> 00:19:48,120 ways as well. So, if less materials are 571 00:19:45,600 --> 00:19:50,679 used, for example, um 572 00:19:48,120 --> 00:19:53,520 than than anticipated calculated the 573 00:19:50,679 --> 00:19:56,240 square footage, um then 574 00:19:53,520 --> 00:19:57,760 then uh that's what's that is what it's 575 00:19:56,240 --> 00:20:00,880 built to the city as well as well 576 00:19:57,760 --> 00:20:01,880 invoiced. Yeah, I mean they're they're 577 00:20:00,880 --> 00:20:03,200 you know, this is what they were 578 00:20:01,880 --> 00:20:05,360 expecting and they're going to they're 579 00:20:03,200 --> 00:20:07,200 going to procure sheets like this is the 580 00:20:05,360 --> 00:20:09,760 first thing that has to happen. So 581 00:20:07,200 --> 00:20:11,880 » Right. So as far as the sheets go those 582 00:20:09,760 --> 00:20:12,480 that would be a single kind of bulk 583 00:20:11,880 --> 00:20:13,720 order I guess. 584 00:20:12,480 --> 00:20:15,360 » Oh yeah, and they're going to jump on 585 00:20:13,720 --> 00:20:17,840 that as soon as possible just because of 586 00:20:15,360 --> 00:20:19,960 the lead time and getting into a roll 587 00:20:17,840 --> 00:20:22,600 because these sheets very well may not 588 00:20:19,960 --> 00:20:25,480 be on the brand yet. Okay. So it's yes 589 00:20:22,600 --> 00:20:27,600 specific to sheets yeah. Okay. 590 00:20:25,480 --> 00:20:29,920 I just know that I mean you know with 591 00:20:27,600 --> 00:20:31,560 paving for example if um 592 00:20:29,920 --> 00:20:33,800 you know for whatever reason it turns 593 00:20:31,560 --> 00:20:37,120 out that it's a few tons less than than 594 00:20:33,800 --> 00:20:38,240 expected. Absolutely 595 00:20:37,120 --> 00:20:40,480 and that's what's important just for 596 00:20:38,240 --> 00:20:42,080 keeping on track with you know that all 597 00:20:40,480 --> 00:20:43,320 those all those things. But yeah we'll 598 00:20:42,080 --> 00:20:45,080 certainly do that. And the good thing 599 00:20:43,320 --> 00:20:47,040 that we have going for us is 600 00:20:45,080 --> 00:20:48,320 the knowledge base of both Gordon and 601 00:20:47,040 --> 00:20:51,320 Blue Iron is that they're 602 00:20:48,320 --> 00:20:53,160 straightforward contracting that very 603 00:20:51,320 --> 00:20:56,000 they work well together. So the mere 604 00:20:53,160 --> 00:20:58,560 fact that they are a well-oiled machine 605 00:20:56,000 --> 00:21:00,600 is going to have you know it's going to 606 00:20:58,560 --> 00:21:03,240 just you know 607 00:21:00,600 --> 00:21:05,960 assist tremendously versus you know 608 00:21:03,240 --> 00:21:08,520 other subs that may or may not have that 609 00:21:05,960 --> 00:21:11,480 well of a communication yeah you know 610 00:21:08,520 --> 00:21:13,320 so. And then also yeah just to just to 611 00:21:11,480 --> 00:21:15,680 add 612 00:21:13,320 --> 00:21:18,040 if there is if there are complications 613 00:21:15,680 --> 00:21:20,840 you know it's it's uh 614 00:21:18,040 --> 00:21:23,040 the city you know through its through 615 00:21:20,840 --> 00:21:24,000 its engineer engineering team would have 616 00:21:23,040 --> 00:21:24,640 to 617 00:21:24,000 --> 00:21:25,960 um 618 00:21:24,640 --> 00:21:26,720 um 619 00:21:25,960 --> 00:21:28,640 uh 620 00:21:26,720 --> 00:21:32,240 basically approve any any changes like 621 00:21:28,640 --> 00:21:34,080 that any changes to the to the scope. 622 00:21:32,240 --> 00:21:36,240 So cost would be a part of that 623 00:21:34,080 --> 00:21:38,440 decision. So if you know if there's a if 624 00:21:36,240 --> 00:21:41,760 there's a huge change 625 00:21:38,440 --> 00:21:44,160 it because of you know some 626 00:21:41,760 --> 00:21:45,880 some unforeseen circumstance that that 627 00:21:44,160 --> 00:21:47,120 results in a big change in cost 628 00:21:45,880 --> 00:21:48,320 somewhere 629 00:21:47,120 --> 00:21:49,600 that would be a decision that the city 630 00:21:48,320 --> 00:21:52,200 would weigh 631 00:21:49,600 --> 00:21:54,320 for in terms of the project as a whole. 632 00:21:52,200 --> 00:21:56,640 What we do know is that we had very 633 00:21:54,320 --> 00:21:58,320 little issues whatsoever with a 634 00:21:56,640 --> 00:22:01,400 significant section of Beach Road 635 00:21:58,320 --> 00:22:04,880 several years ago. We saw very 636 00:22:01,400 --> 00:22:07,679 very bland questions from contractors. 637 00:22:04,880 --> 00:22:09,720 The bids came in without carrying costs 638 00:22:07,679 --> 00:22:11,080 of which we had no idea how this is 639 00:22:09,720 --> 00:22:12,440 going to go down. 640 00:22:11,080 --> 00:22:15,280 So that was those were all really good 641 00:22:12,440 --> 00:22:17,560 signs of a well-designed bid package 642 00:22:15,280 --> 00:22:20,000 from both the technical side as well as 643 00:22:17,560 --> 00:22:22,800 the opinion of cost. It was it was very 644 00:22:20,000 --> 00:22:24,880 it was right in line with what we you 645 00:22:22,800 --> 00:22:26,360 know we were hoping to see. We're just 646 00:22:24,880 --> 00:22:28,840 very excited we didn't see this as a 647 00:22:26,360 --> 00:22:31,040 huge The lowest the lowest bid it's 648 00:22:28,840 --> 00:22:33,760 Gordon Ball not Norman Ball right. I 649 00:22:31,040 --> 00:22:36,320 think in your memo you Yeah right sorry 650 00:22:33,760 --> 00:22:37,720 I for some reason I kept So I think a 651 00:22:36,320 --> 00:22:39,760 little bit of Herman Ball I don't know 652 00:22:37,720 --> 00:22:41,240 why it is wrong. See you the experience 653 00:22:39,760 --> 00:22:44,200 they have but we have not worked with 654 00:22:41,240 --> 00:22:46,600 Gordon Ball before as a city. They are a 655 00:22:44,200 --> 00:22:48,640 large contractor so there's a very good 656 00:22:46,600 --> 00:22:50,920 chance that they wouldn't have probably 657 00:22:48,640 --> 00:22:54,000 been worked on any They are typically a 658 00:22:50,920 --> 00:22:56,000 huge large scale commercial contractor 659 00:22:54,000 --> 00:22:58,720 doing anything else than that. 660 00:22:56,000 --> 00:23:00,240 But I I do know of that nature cuz they 661 00:22:58,720 --> 00:23:01,800 they do a lot of municipal work. 662 00:23:00,240 --> 00:23:03,400 » Okay. I don't know but I don't know the 663 00:23:01,800 --> 00:23:05,320 company is that are public company or a 664 00:23:03,400 --> 00:23:07,400 privately held company we have I'm not 665 00:23:05,320 --> 00:23:09,320 sure and or if it's a member owned we 666 00:23:07,400 --> 00:23:10,880 have to you know have to look into look 667 00:23:09,320 --> 00:23:14,800 into that. One of them There was there 668 00:23:10,880 --> 00:23:16,320 was a level of analysis required for 669 00:23:14,800 --> 00:23:18,400 for this 670 00:23:16,320 --> 00:23:19,800 review. But this is this is They they 671 00:23:18,400 --> 00:23:22,240 are a large company that does many 672 00:23:19,800 --> 00:23:23,960 projects that's not name I've never 673 00:23:22,240 --> 00:23:27,760 heard of. No yeah. 674 00:23:23,960 --> 00:23:28,679 um Yeah it's I have noted them either. 675 00:23:27,760 --> 00:23:30,000 um 676 00:23:28,679 --> 00:23:31,080 I don't know if they're nationwide I 677 00:23:30,000 --> 00:23:32,679 don't know if they're that 678 00:23:31,080 --> 00:23:35,040 » No they're not. I do know that they do a 679 00:23:32,679 --> 00:23:38,200 lot of work with PG&E. They do a lot of 680 00:23:35,040 --> 00:23:41,600 public utility work so they are they 681 00:23:38,200 --> 00:23:43,840 understand the public process. And I do 682 00:23:41,600 --> 00:23:45,480 know again that they work with Blue Iron 683 00:23:43,840 --> 00:23:47,360 quite a bit with projects. And a lot of 684 00:23:45,480 --> 00:23:50,360 times Gordon Ball is in prime for PG&E 685 00:23:47,360 --> 00:23:53,600 projects where Blue Iron is their sub. 686 00:23:50,360 --> 00:23:56,679 Yeah their their references were um 687 00:23:53,600 --> 00:23:58,600 uh were I thought I thought very good 688 00:23:56,679 --> 00:23:59,920 that the projects that they that they 689 00:23:58,600 --> 00:24:01,679 highlighted 690 00:23:59,920 --> 00:24:05,040 were very similar to this. 691 00:24:01,679 --> 00:24:07,960 They all involved installing sheet pile 692 00:24:05,040 --> 00:24:10,080 in in locations a lot of locations with 693 00:24:07,960 --> 00:24:12,200 with water river banks and and boat 694 00:24:10,080 --> 00:24:14,720 launches and and these kind of 695 00:24:12,200 --> 00:24:16,440 situations and and one of the 696 00:24:14,720 --> 00:24:18,240 one of the project managers that I spoke 697 00:24:16,440 --> 00:24:19,800 to from I think it was the Santa Clara 698 00:24:18,240 --> 00:24:21,760 Santa Clara 699 00:24:19,800 --> 00:24:23,320 water district 700 00:24:21,760 --> 00:24:24,120 said that they 701 00:24:23,320 --> 00:24:25,480 um 702 00:24:24,120 --> 00:24:28,320 that they were also in very close 703 00:24:25,480 --> 00:24:30,480 proximity to homes and that they 704 00:24:28,320 --> 00:24:31,960 uh you know they performed everything 705 00:24:30,480 --> 00:24:33,800 that they needed to with you know 706 00:24:31,960 --> 00:24:35,760 vibration monitoring and and that kind 707 00:24:33,800 --> 00:24:38,000 of equipment so they they're definitely 708 00:24:35,760 --> 00:24:40,400 familiar with with this this type of 709 00:24:38,000 --> 00:24:42,280 work. They were they were nearby 710 00:24:40,400 --> 00:24:42,800 projects here in the area in Northern 711 00:24:42,280 --> 00:24:45,480 California. 712 00:24:42,800 --> 00:24:45,480 » Yes yes yeah. 713 00:24:49,400 --> 00:24:56,040 Yeah. 714 00:24:51,920 --> 00:24:59,967 Right well so okay 715 00:24:56,040 --> 00:25:00,400 where did I where was I? um 716 00:24:59,967 --> 00:25:05,120 » [clears throat] 717 00:25:00,400 --> 00:25:05,120 » Addenda yeah okay. So 718 00:25:05,200 --> 00:25:09,640 The addenda were were required to be 719 00:25:07,520 --> 00:25:11,440 acknowledged and and one contractor 720 00:25:09,640 --> 00:25:13,240 didn't as we know 721 00:25:11,440 --> 00:25:14,400 um 722 00:25:13,240 --> 00:25:16,240 Is there 723 00:25:14,400 --> 00:25:17,240 and I understand that the strict nature 724 00:25:16,240 --> 00:25:18,800 of the 725 00:25:17,240 --> 00:25:21,320 bid process 726 00:25:18,800 --> 00:25:21,320 uh 727 00:25:22,080 --> 00:25:25,560 We're not obligated to take anything 728 00:25:23,880 --> 00:25:26,840 just just thing you guys have to get 729 00:25:25,560 --> 00:25:28,760 right? Correct. 730 00:25:26,840 --> 00:25:29,880 » Right we can say cuz you're 731 00:25:28,760 --> 00:25:31,400 you're above what our expected cost will 732 00:25:29,880 --> 00:25:31,520 be we're not obligated to take anything 733 00:25:31,400 --> 00:25:34,160 on 734 00:25:31,520 --> 00:25:35,760 » Yes. Yeah. Um it's still subject to city 735 00:25:34,160 --> 00:25:37,760 approval 736 00:25:35,760 --> 00:25:40,480 but you I mean there's there's there's a 737 00:25:37,760 --> 00:25:43,040 number of line items you know 738 00:25:40,480 --> 00:25:46,480 you know 10 12 and 15 for example where 739 00:25:43,040 --> 00:25:48,760 they are higher than everybody else. 740 00:25:46,480 --> 00:25:50,320 Uh and I know that just the it's the 741 00:25:48,760 --> 00:25:51,360 discrepancies that you guys have the 742 00:25:50,320 --> 00:25:53,679 uniqueness of that individual 743 00:25:51,360 --> 00:25:55,280 contracting approach and their their 744 00:25:53,679 --> 00:25:57,400 sensitivity to that particular line item 745 00:25:55,280 --> 00:25:58,800 I can imagine. But you can't go back to 746 00:25:57,400 --> 00:26:00,080 them and say you know we'd like to we'd 747 00:25:58,800 --> 00:26:02,080 like these three items to be 748 00:26:00,080 --> 00:26:03,720 reconsidered or looked at is does does 749 00:26:02,080 --> 00:26:05,000 this municipal process allow for that or 750 00:26:03,720 --> 00:26:06,840 not? 751 00:26:05,000 --> 00:26:09,720 No um 752 00:26:06,840 --> 00:26:12,640 yeah unfortunately not because of the 753 00:26:09,720 --> 00:26:14,480 because of the RFP process um 754 00:26:12,640 --> 00:26:16,640 you know everybody 755 00:26:14,480 --> 00:26:19,679 uh everybody provide you know has the 756 00:26:16,640 --> 00:26:22,200 same uses the same parameters for their 757 00:26:19,679 --> 00:26:23,320 for their costing and and the the final 758 00:26:22,200 --> 00:26:24,560 price 759 00:26:23,320 --> 00:26:26,400 um 760 00:26:24,560 --> 00:26:28,760 can't be changed before the before the 761 00:26:26,400 --> 00:26:30,320 contract is awarded. After the contract 762 00:26:28,760 --> 00:26:33,000 is awarded 763 00:26:30,320 --> 00:26:35,000 then there can be some negotiation with 764 00:26:33,000 --> 00:26:37,360 with the contractor. The contractor is 765 00:26:35,000 --> 00:26:39,560 awarded at that price but change orders 766 00:26:37,360 --> 00:26:41,120 can 767 00:26:39,560 --> 00:26:43,960 be 768 00:26:41,120 --> 00:26:46,240 generated by the city that change the 769 00:26:43,960 --> 00:26:47,040 scope of work. So that's often in 770 00:26:46,240 --> 00:26:49,160 negotiation. 771 00:26:47,040 --> 00:26:51,120 » Be I mean I'm just saying cuz we have to 772 00:26:49,160 --> 00:26:53,120 separate decision by the city as to 773 00:26:51,120 --> 00:26:56,240 appropriate more money for this 774 00:26:53,120 --> 00:26:59,679 right. So that's not insignificant. um 775 00:26:56,240 --> 00:27:02,280 uh ask so it would be against this 776 00:26:59,679 --> 00:27:03,480 process and perhaps municipal law I 777 00:27:02,280 --> 00:27:06,120 don't know 778 00:27:03,480 --> 00:27:07,640 that you can't go to them and say you 779 00:27:06,120 --> 00:27:10,000 were the low bidder 780 00:27:07,640 --> 00:27:12,080 after we excluded one you know full 781 00:27:10,000 --> 00:27:13,480 transparency you're the low bidder 782 00:27:12,080 --> 00:27:15,400 but you're still above our budget we 783 00:27:13,480 --> 00:27:16,880 can't award the contract unless you were 784 00:27:15,400 --> 00:27:18,720 to reconsider these three line items 785 00:27:16,880 --> 00:27:20,520 which you're you're you're 10% above the 786 00:27:18,720 --> 00:27:23,679 competitors. Would you consider to do 787 00:27:20,520 --> 00:27:26,720 so? That's not you can't do that? 788 00:27:23,679 --> 00:27:28,240 We do you Yes so 789 00:27:26,720 --> 00:27:29,679 and and just so you know that we have 790 00:27:28,240 --> 00:27:30,679 discussed 791 00:27:29,679 --> 00:27:32,320 that 792 00:27:30,679 --> 00:27:34,480 angle because in a public contract 793 00:27:32,320 --> 00:27:37,120 that's kind of where you go next. You 794 00:27:34,480 --> 00:27:38,640 look to VE or value engineer some of 795 00:27:37,120 --> 00:27:42,720 your items 796 00:27:38,640 --> 00:27:45,080 and where you do not take away or 797 00:27:42,720 --> 00:27:49,000 we don't want to adjust and or go back 798 00:27:45,080 --> 00:27:52,200 to the design team to say we need to 799 00:27:49,000 --> 00:27:55,040 change the how we go about getting you 800 00:27:52,200 --> 00:27:57,600 know this design completed. It is maybe 801 00:27:55,040 --> 00:28:00,400 a reduction of overall footage and we 802 00:27:57,600 --> 00:28:01,520 can't you know there's a very good 803 00:28:00,400 --> 00:28:03,160 chance that the contractor is going to 804 00:28:01,520 --> 00:28:04,920 be willing to negotiate cuz they want 805 00:28:03,160 --> 00:28:05,800 this project that's for certain. But if 806 00:28:04,920 --> 00:28:07,280 you 807 00:28:05,800 --> 00:28:09,000 by your process you award the contract 808 00:28:07,280 --> 00:28:12,400 at this price what reason do they have 809 00:28:09,000 --> 00:28:14,400 to negotiate It's not as easy as looking 810 00:28:12,400 --> 00:28:16,360 why are you well you're $80,000 more 811 00:28:14,400 --> 00:28:17,960 than the competitor so why can't you do 812 00:28:16,360 --> 00:28:20,000 it for their cost? Because there are so 813 00:28:17,960 --> 00:28:22,040 many different moving mechanics we don't 814 00:28:20,000 --> 00:28:23,720 know what the other contractor may or 815 00:28:22,040 --> 00:28:24,679 may not have had or if they underbid 816 00:28:23,720 --> 00:28:25,480 that. 817 00:28:24,679 --> 00:28:27,040 But 818 00:28:25,480 --> 00:28:28,400 at this point with them we don't care. 819 00:28:27,040 --> 00:28:30,080 Realistically we don't care. I mean if 820 00:28:28,400 --> 00:28:31,400 if if if we're if we're now one to one 821 00:28:30,080 --> 00:28:33,040 with these folks 822 00:28:31,400 --> 00:28:34,320 and we want to award it then we don't do 823 00:28:33,040 --> 00:28:35,040 it. I I get where you're going with 824 00:28:34,320 --> 00:28:37,159 this. I 825 00:28:35,040 --> 00:28:39,200 I'm just I'm just saying that. 826 00:28:37,159 --> 00:28:40,520 We haven't added obstacle here that 827 00:28:39,200 --> 00:28:41,919 we've got to get this money from this 828 00:28:40,520 --> 00:28:44,679 from the city and ultimately from our 829 00:28:41,919 --> 00:28:46,520 residents. And 830 00:28:44,679 --> 00:28:47,880 that's not a 831 00:28:46,520 --> 00:28:48,760 you know 832 00:28:47,880 --> 00:28:50,440 something the city council is going to 833 00:28:48,760 --> 00:28:52,720 love to be vote on and be comfortable 834 00:28:50,440 --> 00:28:54,440 with and the the way you propose to do 835 00:28:52,720 --> 00:28:56,000 it is to put up other projects. 836 00:28:54,440 --> 00:28:57,080 You know other lanes other maintenance 837 00:28:56,000 --> 00:28:58,280 projects other other capital 838 00:28:57,080 --> 00:29:00,080 improvements 839 00:28:58,280 --> 00:29:01,960 or finding it in the this this this 840 00:29:00,080 --> 00:29:03,560 broader budget whether it's contingency 841 00:29:01,960 --> 00:29:05,400 or things like this which probably 842 00:29:03,560 --> 00:29:07,120 possible but 843 00:29:05,400 --> 00:29:08,040 depending on what you find out there. 844 00:29:07,120 --> 00:29:10,040 Yeah 845 00:29:08,040 --> 00:29:11,840 yeah no for sure. 300,000 for 846 00:29:10,040 --> 00:29:13,000 Belvedere's is is a big 847 00:29:11,840 --> 00:29:14,720 » Well let's let's let's shelve that 848 00:29:13,000 --> 00:29:15,919 aspect over for now cuz if and when we 849 00:29:14,720 --> 00:29:17,880 go there there's other things to talk 850 00:29:15,919 --> 00:29:19,400 about certainly. Um 851 00:29:17,880 --> 00:29:22,240 I would just say that it's a it's a 852 00:29:19,400 --> 00:29:24,560 competitive public bidding process and 853 00:29:22,240 --> 00:29:25,919 so you've provided all the parameters in 854 00:29:24,560 --> 00:29:27,760 the contract documents and these 855 00:29:25,919 --> 00:29:29,840 contractors have put their best foot 856 00:29:27,760 --> 00:29:32,320 forward so to speak. This is this is 857 00:29:29,840 --> 00:29:33,960 what they're proposing to do and I would 858 00:29:32,320 --> 00:29:36,800 say you're not really one to one with 859 00:29:33,960 --> 00:29:38,120 anybody until the contract is awarded. 860 00:29:36,800 --> 00:29:39,320 But they also know your estimate going 861 00:29:38,120 --> 00:29:41,000 in. 862 00:29:39,320 --> 00:29:43,480 I mean it's it's it's not it's not a 863 00:29:41,000 --> 00:29:45,400 it's a coming from the private you know 864 00:29:43,480 --> 00:29:46,720 construction world that's just lunacy 865 00:29:45,400 --> 00:29:47,760 lunacy to me. 866 00:29:46,720 --> 00:29:49,680 But 867 00:29:47,760 --> 00:29:51,000 Well I get it. If you if you if you're 868 00:29:49,680 --> 00:29:53,120 attempting to negotiate with one 869 00:29:51,000 --> 00:29:54,880 contractor before awarding a contract, 870 00:29:53,120 --> 00:29:56,880 all the other ones say, "Well, how come 871 00:29:54,880 --> 00:29:58,440 you didn't come to us? We We could We 872 00:29:56,880 --> 00:29:59,960 could do it, too." And it just, you 873 00:29:58,440 --> 00:30:02,560 know, it could sort of unravel the whole 874 00:29:59,960 --> 00:30:04,440 process. I get it. I get it. 875 00:30:02,560 --> 00:30:06,400 Yeah, and I I mean, to your point, you 876 00:30:04,440 --> 00:30:08,760 lose all your leverage if if you've 877 00:30:06,400 --> 00:30:10,400 already signed a contract with them. Um 878 00:30:08,760 --> 00:30:12,320 but I think I mean, in my in my 879 00:30:10,400 --> 00:30:15,480 experience, and and maybe you you guys 880 00:30:12,320 --> 00:30:18,920 can chime in on this, um 881 00:30:15,480 --> 00:30:21,640 you know, contractors are generally uh 882 00:30:18,920 --> 00:30:22,280 willing to talk. You know, they they're 883 00:30:21,640 --> 00:30:23,080 um 884 00:30:22,280 --> 00:30:25,040 that 885 00:30:23,080 --> 00:30:26,520 if you say, you know, "By the way, you 886 00:30:25,040 --> 00:30:27,520 know, we We've got everything signed, 887 00:30:26,520 --> 00:30:28,480 but 888 00:30:27,520 --> 00:30:30,880 um 889 00:30:28,480 --> 00:30:32,640 this is this uh you know, finances are 890 00:30:30,880 --> 00:30:35,480 very tight for us, and we would like to 891 00:30:32,640 --> 00:30:37,000 find ways to to reduce the costs. Um we 892 00:30:35,480 --> 00:30:38,960 we may want to reduce the scope 893 00:30:37,000 --> 00:30:41,640 somewhere. Um 894 00:30:38,960 --> 00:30:43,280 but we did notice in your in your uh bid 895 00:30:41,640 --> 00:30:45,600 that you know, these were much higher 896 00:30:43,280 --> 00:30:47,960 than than other people's, and Okay. are 897 00:30:45,600 --> 00:30:49,440 you able to, you know, you know, share 898 00:30:47,960 --> 00:30:50,640 with us what the you Cuz we can always 899 00:30:49,440 --> 00:30:52,400 say to them, "So, we're not going to 900 00:30:50,640 --> 00:30:55,560 either uh 901 00:30:52,400 --> 00:30:56,920 Ball, you reduce by this amount. And and 902 00:30:55,560 --> 00:30:58,920 we'll award it to you, otherwise we will 903 00:30:56,920 --> 00:31:00,360 award it to nobody, and we will we will 904 00:30:58,920 --> 00:31:02,120 we won't go forward, and we'll do 905 00:31:00,360 --> 00:31:03,680 another RFP, and we'll just 906 00:31:02,120 --> 00:31:06,360 we'll rebid the whole thing, and let let 907 00:31:03,680 --> 00:31:08,200 them it's a little bit of a 908 00:31:06,360 --> 00:31:09,880 Put that on the table then. If they say 909 00:31:08,200 --> 00:31:11,880 they won't, then we just put the RFP out 910 00:31:09,880 --> 00:31:13,400 again, and start the process again. I 911 00:31:11,880 --> 00:31:14,720 don't think you can Well, well, I don't 912 00:31:13,400 --> 00:31:16,400 think you can do that. Well, why not? 913 00:31:14,720 --> 00:31:17,920 Why Why What What Well, look, it's 914 00:31:16,400 --> 00:31:19,320 public I mean, I'm not a I'm not a I'm 915 00:31:17,920 --> 00:31:20,720 not a contractor. It changes the scope. 916 00:31:19,320 --> 00:31:22,200 It changes the scope. I mean, obviously, 917 00:31:20,720 --> 00:31:24,040 or the timing. No, no, because because 918 00:31:22,200 --> 00:31:26,200 basically, if if if if if we choose not 919 00:31:24,040 --> 00:31:27,640 to do this now, realistically at this 920 00:31:26,200 --> 00:31:29,080 point in time, even with the same scope 921 00:31:27,640 --> 00:31:31,600 in a rebid process, or modify this 922 00:31:29,080 --> 00:31:33,160 slightly, we missed the '26 window. 923 00:31:31,600 --> 00:31:35,400 Right. If you miss the '26 window, it's 924 00:31:33,160 --> 00:31:36,720 not going to get any less expensive 925 00:31:35,400 --> 00:31:38,720 knowing, you know, that 926 00:31:36,720 --> 00:31:40,680 » That, for sure. And the re so the the 927 00:31:38,720 --> 00:31:43,320 re-solicitation process, what we've done 928 00:31:40,680 --> 00:31:45,120 is certainly has a a cost that isn't 929 00:31:43,320 --> 00:31:47,640 going to necessarily, you know, be able 930 00:31:45,120 --> 00:31:49,320 to be recouped as well in a lot of the 931 00:31:47,640 --> 00:31:51,520 public, you know, process has, you know, 932 00:31:49,320 --> 00:31:52,640 there's has to be, you know, completed 933 00:31:51,520 --> 00:31:54,480 again. But but if we don't have the 934 00:31:52,640 --> 00:31:56,240 money Yeah, no, I I they might say, 935 00:31:54,480 --> 00:31:58,040 "Okay, well, we'll we'll help you with 936 00:31:56,240 --> 00:32:00,600 that." So, I mean 937 00:31:58,040 --> 00:32:01,760 they might say, "Okay." 938 00:32:00,600 --> 00:32:03,960 And that's why I know that, you know, 939 00:32:01,760 --> 00:32:05,280 again, internally within you know, with 940 00:32:03,960 --> 00:32:07,040 James, I'll try to remember who else was 941 00:32:05,280 --> 00:32:10,160 on that call, but Stetson, we talked 942 00:32:07,040 --> 00:32:12,800 about at least areas identified that we 943 00:32:10,160 --> 00:32:14,440 can discuss, um and it was confident We 944 00:32:12,800 --> 00:32:16,480 don't have specifics, you know, but 945 00:32:14,440 --> 00:32:18,679 there were certainly some areas uh to 946 00:32:16,480 --> 00:32:19,480 look at that we started to discuss. You 947 00:32:18,679 --> 00:32:21,400 know, 948 00:32:19,480 --> 00:32:23,120 one of them would be, you know, just uh 949 00:32:21,400 --> 00:32:25,520 essentially 950 00:32:23,120 --> 00:32:27,360 I I think again, though in accordance 951 00:32:25,520 --> 00:32:29,200 with the public contracting, you you 952 00:32:27,360 --> 00:32:31,640 can't begin these negotiations until 953 00:32:29,200 --> 00:32:34,120 after a contract is awarded to to one of 954 00:32:31,640 --> 00:32:35,760 these. And so, I think that's probably 955 00:32:34,120 --> 00:32:36,920 what the city is looking at. You You 956 00:32:35,760 --> 00:32:39,160 either have to make the decision to 957 00:32:36,920 --> 00:32:40,760 award a contract Could we go to all of 958 00:32:39,160 --> 00:32:42,840 them and say, "This is This is our 959 00:32:40,760 --> 00:32:44,720 budget. Would you like to Uh I think 960 00:32:42,840 --> 00:32:46,400 that that that sort of involves 961 00:32:44,720 --> 00:32:48,160 reopening up the bidding process. I 962 00:32:46,400 --> 00:32:49,480 don't I can't I think once it's closed, 963 00:32:48,160 --> 00:32:51,520 you can't reopen it. You would be 964 00:32:49,480 --> 00:32:53,160 looking at a rebid. 965 00:32:51,520 --> 00:32:55,280 The issue with the timing is that 966 00:32:53,160 --> 00:32:56,880 there's an in-water work window, June 967 00:32:55,280 --> 00:32:59,960 through October. 968 00:32:56,880 --> 00:33:01,520 And so, to start the process over means 969 00:32:59,960 --> 00:33:04,040 we wouldn't have enough time to issue a 970 00:33:01,520 --> 00:33:05,880 rebid, open it all up, and receive bids 971 00:33:04,040 --> 00:33:08,200 in order to construct this year. So, 972 00:33:05,880 --> 00:33:09,480 re-bidding the project does mean you're 973 00:33:08,200 --> 00:33:12,440 you're you're looking at next year, 974 00:33:09,480 --> 00:33:12,440 2027. 975 00:33:14,160 --> 00:33:17,360 Let's be realistic. 976 00:33:15,679 --> 00:33:19,080 Um 977 00:33:17,360 --> 00:33:21,360 how confident are we that 978 00:33:19,080 --> 00:33:23,840 with the ability to start this project? 979 00:33:21,360 --> 00:33:26,240 First question. Second question is 980 00:33:23,840 --> 00:33:27,640 um what I would be afraid would happen 981 00:33:26,240 --> 00:33:29,400 is that there would be a delay, there 982 00:33:27,640 --> 00:33:30,920 would be a uh uh 983 00:33:29,400 --> 00:33:31,760 a backlog of this particular equipment 984 00:33:30,920 --> 00:33:33,040 or something like that, and the 985 00:33:31,760 --> 00:33:34,400 contractor gets started under this 986 00:33:33,040 --> 00:33:35,760 price, and says we have to finish it 987 00:33:34,400 --> 00:33:38,240 next year, and here's the here's the 988 00:33:35,760 --> 00:33:39,440 cost to do so. 989 00:33:38,240 --> 00:33:41,679 Well, I think they would be under 990 00:33:39,440 --> 00:33:43,520 contract to um 991 00:33:41,679 --> 00:33:45,679 uh you know, to to complete it by 992 00:33:43,520 --> 00:33:47,040 October uh 15th, I think is what the 993 00:33:45,679 --> 00:33:49,880 contract says. But just like but just 994 00:33:47,040 --> 00:33:51,320 like finding a a a you know, Right. 995 00:33:49,880 --> 00:33:52,720 immovable boulder under the ground, 996 00:33:51,320 --> 00:33:55,000 there's a there's a there's a delay with 997 00:33:52,720 --> 00:33:56,960 Blue Hill Stetson. I apologize. Blue 998 00:33:55,000 --> 00:33:58,040 Iron. Blue Iron. That That can't deliver 999 00:33:56,960 --> 00:33:59,679 it. It's out of their control, and 1000 00:33:58,040 --> 00:34:01,440 they're they're they're delayed a month, 1001 00:33:59,679 --> 00:34:03,400 and they and they That's I don't for I 1002 00:34:01,440 --> 00:34:06,560 mean, anything's possible, but I'm um 1003 00:34:03,400 --> 00:34:08,960 they're they're they have agreed to 1004 00:34:06,560 --> 00:34:10,919 perform this project by a certain date, 1005 00:34:08,960 --> 00:34:13,080 and if not, there are liquidated damages 1006 00:34:10,919 --> 00:34:16,480 daily that occur if they are not 1007 00:34:13,080 --> 00:34:17,600 complete by that time frame. 1008 00:34:16,480 --> 00:34:19,440 Do we Do we think we'll get this done in 1009 00:34:17,600 --> 00:34:20,760 this time frame? 1010 00:34:19,440 --> 00:34:22,320 I mean, can it be They need to go, yeah. 1011 00:34:20,760 --> 00:34:25,679 Permit I mean, we're you know, there's 1012 00:34:22,320 --> 00:34:28,240 Um there are there are a few factors um 1013 00:34:25,679 --> 00:34:31,000 that that are outstanding. Um 1014 00:34:28,240 --> 00:34:32,840 Yeah. What Like what? So, first of all, 1015 00:34:31,000 --> 00:34:35,280 uh permitting. Uh we're waiting for a 1016 00:34:32,840 --> 00:34:39,679 BCDC permit. Um 1017 00:34:35,280 --> 00:34:41,760 and they are in a review sort of stage. 1018 00:34:39,679 --> 00:34:45,000 Um they have a commission meeting where 1019 00:34:41,760 --> 00:34:48,120 it needs to be approved. Um and which I 1020 00:34:45,000 --> 00:34:51,200 believe it is April 29th, I think, 19th 1021 00:34:48,120 --> 00:34:52,520 or 29th, so it can only be after that. 1022 00:34:51,200 --> 00:34:56,760 Um 1023 00:34:52,520 --> 00:35:00,800 uh PG&E need to complete some uh some 1024 00:34:56,760 --> 00:35:02,720 work in on Beach Road to modify their uh 1025 00:35:00,800 --> 00:35:04,640 their lines, their um 1026 00:35:02,720 --> 00:35:05,920 utility lines, main lines through there. 1027 00:35:04,640 --> 00:35:07,840 » Before we get going. 1028 00:35:05,920 --> 00:35:10,000 Yes. Yeah. Given what we've heard from 1029 00:35:07,840 --> 00:35:13,040 PG&E, is that is that likely? 1030 00:35:10,000 --> 00:35:15,600 Uh they uh we we ask them We We meet 1031 00:35:13,040 --> 00:35:17,840 with them about every 2 weeks uh 1032 00:35:15,600 --> 00:35:19,680 to get progress and and update uh 1033 00:35:17,840 --> 00:35:21,200 updates from them. Um 1034 00:35:19,680 --> 00:35:24,040 they 1035 00:35:21,200 --> 00:35:25,120 assure us that um that that it's that 1036 00:35:24,040 --> 00:35:28,960 it's 1037 00:35:25,120 --> 00:35:31,080 doable to do before before June. Um 1038 00:35:28,960 --> 00:35:33,160 but we have no control over that or or 1039 00:35:31,080 --> 00:35:36,240 over their their work. So, if these 1040 00:35:33,160 --> 00:35:39,240 dependencies um if if Gordon and 1041 00:35:36,240 --> 00:35:41,359 Company, Gordon Ball, can't get started 1042 00:35:39,240 --> 00:35:42,480 to comfortably make the window 1043 00:35:41,359 --> 00:35:44,200 this contract's void then, right? We're 1044 00:35:42,480 --> 00:35:45,320 not, you know, cuz obviously, the prices 1045 00:35:44,200 --> 00:35:47,600 probably wouldn't be held for the next 1046 00:35:45,320 --> 00:35:49,880 year. 1047 00:35:47,600 --> 00:35:51,960 Well, I think there's probably room to 1048 00:35:49,880 --> 00:35:54,920 negotiate, and and if they would like to 1049 00:35:51,960 --> 00:35:57,880 keep the contract for next year um you 1050 00:35:54,920 --> 00:35:59,680 know, they may they may be some uh some 1051 00:35:57,880 --> 00:36:00,840 way to um 1052 00:35:59,680 --> 00:36:03,000 you know, to 1053 00:36:00,840 --> 00:36:04,160 to keep them on board um with some kind 1054 00:36:03,000 --> 00:36:06,960 of uh 1055 00:36:04,160 --> 00:36:09,120 you know, adjustment in price, you know, 1056 00:36:06,960 --> 00:36:11,040 related to inflation or something. There 1057 00:36:09,120 --> 00:36:12,680 There is some flexibility built into the 1058 00:36:11,040 --> 00:36:14,240 way this is structured. There's a 1059 00:36:12,680 --> 00:36:16,400 There's a The in-water work window is a 1060 00:36:14,240 --> 00:36:18,600 5-month period, June through October, 1061 00:36:16,400 --> 00:36:21,160 but the actual construction period is 1062 00:36:18,600 --> 00:36:23,000 only 65 days. And so, even if they don't 1063 00:36:21,160 --> 00:36:25,200 necessarily have to start on June 1st, I 1064 00:36:23,000 --> 00:36:26,359 mean, that can slide backwards, and 1065 00:36:25,200 --> 00:36:28,320 there would there would still be room 1066 00:36:26,359 --> 00:36:30,040 for them to complete this project. And 1067 00:36:28,320 --> 00:36:31,400 in theory, the the out-of-water work can 1068 00:36:30,040 --> 00:36:33,960 continue outside that window. That's 1069 00:36:31,400 --> 00:36:35,080 correct. It is. Yeah. Yeah. 1070 00:36:33,960 --> 00:36:36,920 Um 1071 00:36:35,080 --> 00:36:38,960 And so, you know, that's 1072 00:36:36,920 --> 00:36:40,920 that's the reason we did try to put this 1073 00:36:38,960 --> 00:36:42,920 out to bid early, to get the bids early, 1074 00:36:40,920 --> 00:36:46,520 to have a contractor under contract 1075 00:36:42,920 --> 00:36:47,480 early so that these these scheduling and 1076 00:36:46,520 --> 00:36:50,120 um 1077 00:36:47,480 --> 00:36:52,480 the the coordination between the city, 1078 00:36:50,120 --> 00:36:54,080 Hadley, PG&E, this can all kind of be 1079 00:36:52,480 --> 00:36:55,760 worked out over the next several months 1080 00:36:54,080 --> 00:36:58,510 until June, and when when the 1081 00:36:55,760 --> 00:37:00,440 construction would actually occur. Mhm. 1082 00:36:58,510 --> 00:37:02,240 » [clears throat] 1083 00:37:00,440 --> 00:37:04,520 » Yeah. Um 1084 00:37:02,240 --> 00:37:06,920 The other The other factor is uh 1085 00:37:04,520 --> 00:37:08,920 easements with uh temporary construction 1086 00:37:06,920 --> 00:37:10,960 easements with the property owners on on 1087 00:37:08,920 --> 00:37:12,320 Beach Road, because uh 1088 00:37:10,960 --> 00:37:15,240 the work that would need to take place 1089 00:37:12,320 --> 00:37:16,320 on their property um for this project to 1090 00:37:15,240 --> 00:37:17,400 to go ahead. I mean, the seawall 1091 00:37:16,320 --> 00:37:20,320 actually 1092 00:37:17,400 --> 00:37:22,840 enters their property at uh you know, 1093 00:37:20,320 --> 00:37:24,200 at at their property lines. Um 1094 00:37:22,840 --> 00:37:25,800 so, it's a couple of feet in from the 1095 00:37:24,200 --> 00:37:27,520 property line, so the the work and the 1096 00:37:25,800 --> 00:37:29,080 structures would would all be on their 1097 00:37:27,520 --> 00:37:30,080 on their land. 1098 00:37:29,080 --> 00:37:32,880 Um 1099 00:37:30,080 --> 00:37:35,440 and we've met we've met with them um 1100 00:37:32,880 --> 00:37:38,040 a few times, uh described the project, 1101 00:37:35,440 --> 00:37:40,000 and we've sent over the uh the easement 1102 00:37:38,040 --> 00:37:41,440 agreements. Um 1103 00:37:40,000 --> 00:37:42,680 So, at this point, we're waiting for 1104 00:37:41,440 --> 00:37:46,520 them to 1105 00:37:42,680 --> 00:37:46,520 um review those. Uh 1106 00:37:46,920 --> 00:37:51,160 And we're we're ready to go for the for 1107 00:37:48,760 --> 00:37:53,320 the April meeting for them uh to to have 1108 00:37:51,160 --> 00:37:55,520 those easements um 1109 00:37:53,320 --> 00:37:57,240 approved by City Council. Um 1110 00:37:55,520 --> 00:37:58,840 And yeah, but but we do have to wait for 1111 00:37:57,240 --> 00:38:00,200 their their signatures, basically, on 1112 00:37:58,840 --> 00:38:01,440 their side. 1113 00:38:00,200 --> 00:38:03,560 How many property owners are we talking 1114 00:38:01,440 --> 00:38:05,640 about again? Uh three property owners. 1115 00:38:03,560 --> 00:38:09,440 Um Yeah. Um 1116 00:38:05,640 --> 00:38:12,640 And one of them has indicated that um 1117 00:38:09,440 --> 00:38:14,880 he's is absolutely willing. Um he's just 1118 00:38:12,640 --> 00:38:18,240 out of the country right now. Um so, 1119 00:38:14,880 --> 00:38:20,240 he's uh seems seems like he's ready to 1120 00:38:18,240 --> 00:38:21,720 sign as soon as he gets back. Uh the 1121 00:38:20,240 --> 00:38:24,800 other two 1122 00:38:21,720 --> 00:38:26,840 uh are new uh new owners of of the 1123 00:38:24,800 --> 00:38:28,359 property. And um 1124 00:38:26,840 --> 00:38:30,800 I think it seems like they're wanting to 1125 00:38:28,359 --> 00:38:32,840 review the the language more carefully, 1126 00:38:30,800 --> 00:38:34,880 and um Was it a 1127 00:38:32,840 --> 00:38:36,800 It's three properties, but two owners, 1128 00:38:34,880 --> 00:38:37,240 right? Cuz there's Yeah. 1129 00:38:36,800 --> 00:38:39,160 Yes. 1130 00:38:37,240 --> 00:38:41,280 » Hadley owns one building, and the Spruce 1131 00:38:39,160 --> 00:38:43,200 Group owns the other two. Yes, yeah. And 1132 00:38:41,280 --> 00:38:45,600 those other two are are owned, I think, 1133 00:38:43,200 --> 00:38:47,760 on paper by two different LLCs, but it's 1134 00:38:45,600 --> 00:38:49,440 the same people. Okay, so that's okay. 1135 00:38:47,760 --> 00:38:51,640 Yeah. 1136 00:38:49,440 --> 00:38:53,080 Yeah. 1137 00:38:51,640 --> 00:38:54,320 So, from a financial perspective, I'm 1138 00:38:53,080 --> 00:38:56,440 looking at 1139 00:38:54,320 --> 00:38:59,840 this overall project budget relative to 1140 00:38:56,440 --> 00:39:02,600 appropriations funding at the top. Um 1141 00:38:59,840 --> 00:39:04,080 we're looking at that 3.475 1142 00:39:02,600 --> 00:39:08,480 line 1143 00:39:04,080 --> 00:39:11,480 of which includes two $280,000 or so, 1144 00:39:08,480 --> 00:39:13,560 that's going to a separate contractor to 1145 00:39:11,480 --> 00:39:15,160 do the utility work. 1146 00:39:13,560 --> 00:39:17,200 Right? So, that's where we get the 300 1147 00:39:15,160 --> 00:39:19,720 So, that the the we have a $315,000 1148 00:39:17,200 --> 00:39:21,640 variance on that line if we take this 1149 00:39:19,720 --> 00:39:23,960 this this bid from Gordon and Ball, 1150 00:39:21,640 --> 00:39:26,240 right? 1151 00:39:23,960 --> 00:39:27,920 Uh yeah, it's it's 1152 00:39:26,240 --> 00:39:30,400 uh without knowing it, we don't have the 1153 00:39:27,920 --> 00:39:33,120 exact number for the contracts uh of the 1154 00:39:30,400 --> 00:39:34,760 other amounts. I would assume the 279 1155 00:39:33,120 --> 00:39:36,320 that the way you got your 315 was the 1156 00:39:34,760 --> 00:39:39,320 279 1157 00:39:36,320 --> 00:39:41,120 um plus the 35 over 1158 00:39:39,320 --> 00:39:43,240 this number. Correct, yeah. With a with 1159 00:39:41,120 --> 00:39:45,440 a little bit of Yeah, yeah. flexibility 1160 00:39:43,240 --> 00:39:47,880 to in case that 279 is over. 1161 00:39:45,440 --> 00:39:50,880 » So, I'm just writing 315 in parentheses 1162 00:39:47,880 --> 00:39:53,240 next to the 3475, which means Right. on 1163 00:39:50,880 --> 00:39:56,520 this page we're 315 over budget on that 1164 00:39:53,240 --> 00:39:58,960 particular line. And you've 1165 00:39:56,520 --> 00:40:00,920 discussed this with Helga and her and 1166 00:39:58,960 --> 00:40:04,320 your recommendations with Robert as well 1167 00:40:00,920 --> 00:40:06,040 is to handle this either within this 1168 00:40:04,320 --> 00:40:08,760 $4.6 million 1169 00:40:06,040 --> 00:40:10,720 total project expenditures 1170 00:40:08,760 --> 00:40:13,120 budget, finding it somewhere, whether 1171 00:40:10,720 --> 00:40:14,120 it's coming out of your hide 1172 00:40:13,120 --> 00:40:15,640 I mean from a project manager 1173 00:40:14,120 --> 00:40:17,360 perspective or somewhere along this line 1174 00:40:15,640 --> 00:40:19,080 of our mass remediation, somewhere 1175 00:40:17,360 --> 00:40:21,080 somewhere through here you think you 1176 00:40:19,080 --> 00:40:23,000 might be able to find some 1177 00:40:21,080 --> 00:40:24,480 money. That that's option one, right? 1178 00:40:23,000 --> 00:40:27,080 Just confirming that's what that means. 1179 00:40:24,480 --> 00:40:28,800 » Yeah. And option two is in the broader 1180 00:40:27,080 --> 00:40:30,720 public works budget. 1181 00:40:28,800 --> 00:40:32,560 Um capital improvement projects, whether 1182 00:40:30,720 --> 00:40:34,000 it's paving or whether it's a retaining 1183 00:40:32,560 --> 00:40:35,760 wall or whether it's a lane improvement 1184 00:40:34,000 --> 00:40:37,160 or something like that, finding that 1185 00:40:35,760 --> 00:40:38,960 money in that over the next couple 1186 00:40:37,160 --> 00:40:40,600 years. Yeah, and and 1187 00:40:38,960 --> 00:40:43,960 and there are two components to that, 1188 00:40:40,600 --> 00:40:45,360 too. So, there are existing CIP funds 1189 00:40:43,960 --> 00:40:46,760 that 1190 00:40:45,360 --> 00:40:48,360 that that 1191 00:40:46,760 --> 00:40:50,000 overlap with 1192 00:40:48,360 --> 00:40:52,000 with with some of the work in this 1193 00:40:50,000 --> 00:40:53,880 project. So, paving for example, there's 1194 00:40:52,000 --> 00:40:55,880 a we have a we have a CIP fund for 1195 00:40:53,880 --> 00:40:58,440 paving. 1196 00:40:55,880 --> 00:41:00,840 And that that could cover the cost of 1197 00:40:58,440 --> 00:41:02,920 the the paving restoration 1198 00:41:00,840 --> 00:41:04,880 in instead of using this 1199 00:41:02,920 --> 00:41:05,320 this account for that for for those 1200 00:41:04,880 --> 00:41:06,040 costs. 1201 00:41:05,320 --> 00:41:10,320 » Use that account. 1202 00:41:06,040 --> 00:41:10,320 » Yeah, exactly. I get it. Um 1203 00:41:12,120 --> 00:41:14,920 Yeah, exactly. And the sidewalk, yeah, 1204 00:41:13,800 --> 00:41:16,760 exactly. 1205 00:41:14,920 --> 00:41:20,120 And and we have it in we have not 1206 00:41:16,760 --> 00:41:22,120 embedded the contingency on this budget. 1207 00:41:20,120 --> 00:41:24,480 Um 1208 00:41:22,120 --> 00:41:25,680 Well, with that 1209 00:41:24,480 --> 00:41:28,960 so 1210 00:41:25,680 --> 00:41:28,960 so with that over 1211 00:41:29,120 --> 00:41:32,760 I'm just saying on paper on paper right 1212 00:41:31,000 --> 00:41:34,320 now we're talking about that one line 1213 00:41:32,760 --> 00:41:35,840 item having a 1214 00:41:34,320 --> 00:41:40,000 a negative variance. 1215 00:41:35,840 --> 00:41:43,280 But that 383 arguably still exists if we 1216 00:41:40,000 --> 00:41:44,160 if we know we have 4.6 in our in our in 1217 00:41:43,280 --> 00:41:46,920 our fund at this point. 1218 00:41:44,160 --> 00:41:48,480 » Yes, right. Yes. So, so yeah, 1219 00:41:46,920 --> 00:41:49,520 sorry I I I 1220 00:41:48,480 --> 00:41:51,960 took me a minute there, but yeah, 1221 00:41:49,520 --> 00:41:52,800 basically that would restore that that 1222 00:41:51,960 --> 00:41:53,840 contingency amount. 1223 00:41:52,800 --> 00:41:55,240 » Yeah, yeah, absolutely. 1224 00:41:53,840 --> 00:41:57,080 So, 1225 00:41:55,240 --> 00:41:58,320 however we decide, 1226 00:41:57,080 --> 00:42:00,520 you may want to work with Helga. I would 1227 00:41:58,320 --> 00:42:02,440 suggest if this is to be recommended to 1228 00:42:00,520 --> 00:42:05,520 the city council, I wouldn't go in with 1229 00:42:02,440 --> 00:42:07,720 this to $315,000 over tier. 1230 00:42:05,520 --> 00:42:09,040 I would I would I would front it by 1231 00:42:07,720 --> 00:42:10,720 saying exactly what you've talked about 1232 00:42:09,040 --> 00:42:14,600 before, that we're going to approach 1233 00:42:10,720 --> 00:42:16,800 this if we award this contract with 1234 00:42:14,600 --> 00:42:18,800 diligent approach to value engineer to 1235 00:42:16,800 --> 00:42:20,360 to line item look at things to to 1236 00:42:18,800 --> 00:42:21,920 recognize this is over budget and see 1237 00:42:20,360 --> 00:42:24,240 where we can get some some some 1238 00:42:21,920 --> 00:42:25,520 potential savings out of this contract. 1239 00:42:24,240 --> 00:42:26,720 May yield nothing, but but that's an 1240 00:42:25,520 --> 00:42:28,720 approach and we certainly should do 1241 00:42:26,720 --> 00:42:30,480 that. I would also try to identify 1242 00:42:28,720 --> 00:42:33,400 specifically where you think this money 1243 00:42:30,480 --> 00:42:35,480 can come from. Meaning if you if you if 1244 00:42:33,400 --> 00:42:36,640 you have known expenditures that you 1245 00:42:35,480 --> 00:42:38,520 think are going to be less than what you 1246 00:42:36,640 --> 00:42:40,880 have up here anyway, 1247 00:42:38,520 --> 00:42:42,080 for example, if you know that 1248 00:42:40,880 --> 00:42:43,440 you know, the 1249 00:42:42,080 --> 00:42:45,400 the 1250 00:42:43,440 --> 00:42:46,520 environmental mitigation costs are not 1251 00:42:45,400 --> 00:42:48,800 $100,000, but they're going to be 1252 00:42:46,520 --> 00:42:50,960 $80,000 much like we had with the repair 1253 00:42:48,800 --> 00:42:52,200 over there on Beach Road. You know, 1254 00:42:50,960 --> 00:42:53,640 you that came in less than we thought we 1255 00:42:52,200 --> 00:42:55,160 were going to commit. So, I'm not saying 1256 00:42:53,640 --> 00:42:57,640 we take that money, but I'm saying if 1257 00:42:55,160 --> 00:42:59,120 you know already where we are, I 1258 00:42:57,640 --> 00:43:03,480 identify it. You could you could 1259 00:42:59,120 --> 00:43:05,720 probably say of that we know we've got 1260 00:43:03,480 --> 00:43:08,600 $35,000 in 1261 00:43:05,720 --> 00:43:12,560 city planning paving sorry, sidewalks 1262 00:43:08,600 --> 00:43:16,480 for the next 2026 2027 we have 1263 00:43:12,560 --> 00:43:18,520 $45,000 in in road paving for the 2026 1264 00:43:16,480 --> 00:43:20,120 and 2027 budget that we can apply to 1265 00:43:18,520 --> 00:43:21,680 this. 1266 00:43:20,120 --> 00:43:24,680 And our assessment is that that won't 1267 00:43:21,680 --> 00:43:26,000 damage our overall 1268 00:43:24,680 --> 00:43:27,720 value of our infrastructure around the 1269 00:43:26,000 --> 00:43:29,240 city. So, we can apply that those small 1270 00:43:27,720 --> 00:43:31,000 amounts of those larger budgets. We can 1271 00:43:29,240 --> 00:43:33,760 also apply 1272 00:43:31,000 --> 00:43:34,840 $200,000 of contingency to that and 1273 00:43:33,760 --> 00:43:36,320 that's where we think we can make up 1274 00:43:34,840 --> 00:43:37,960 this money and still and still retain 1275 00:43:36,320 --> 00:43:38,480 the 4.630. 1276 00:43:37,960 --> 00:43:40,120 Right. 1277 00:43:38,480 --> 00:43:41,720 » Yeah, exactly. You need to present it in 1278 00:43:40,120 --> 00:43:43,800 a fashion like that. Right. Yeah, and 1279 00:43:41,720 --> 00:43:46,160 that's that's that is definitely what's 1280 00:43:43,800 --> 00:43:48,640 what we had planned was you know, be 1281 00:43:46,160 --> 00:43:50,800 able to be specific about you know, 1282 00:43:48,640 --> 00:43:52,400 about how you know, how this is 1283 00:43:50,800 --> 00:43:55,080 possible. 1284 00:43:52,400 --> 00:43:57,600 And and there would be council approval 1285 00:43:55,080 --> 00:43:58,840 for for some of those changes as well. 1286 00:43:57,600 --> 00:43:59,880 Well, they'll have 1287 00:43:58,840 --> 00:44:01,640 comments and they'll and they'll 1288 00:43:59,880 --> 00:44:03,880 probably stress you know, we really want 1289 00:44:01,640 --> 00:44:05,520 you to push the value engineering and 1290 00:44:03,880 --> 00:44:06,760 and really you know, sharpen your pencil 1291 00:44:05,520 --> 00:44:08,400 on the scope, you know, once you have 1292 00:44:06,760 --> 00:44:10,480 the contract selected to keep within the 1293 00:44:08,400 --> 00:44:12,280 the appropriate public bidding process 1294 00:44:10,480 --> 00:44:14,920 so that we can make sure we we make this 1295 00:44:12,280 --> 00:44:17,240 project as as tight and and not only 1296 00:44:14,920 --> 00:44:18,800 timely, but also it does our our our 1297 00:44:17,240 --> 00:44:20,200 base minimum needs for the for the for 1298 00:44:18,800 --> 00:44:21,760 the for the money we're spending so we 1299 00:44:20,200 --> 00:44:23,840 get as much value as we possibly can. 1300 00:44:21,760 --> 00:44:27,080 Right. Yeah. Yeah. 1301 00:44:23,840 --> 00:44:28,200 Yeah, I yeah, I I hear you and I think 1302 00:44:27,080 --> 00:44:30,680 um 1303 00:44:28,200 --> 00:44:32,320 I we all feel that way. We definitely I 1304 00:44:30,680 --> 00:44:33,880 know I I you know, and and and I 1305 00:44:32,320 --> 00:44:36,120 definitely know Robert does and 1306 00:44:33,880 --> 00:44:39,480 everybody does. 1307 00:44:36,120 --> 00:44:41,720 Yeah, I mean it's it's um it's 1308 00:44:39,480 --> 00:44:44,480 we we all want a want a project that's 1309 00:44:41,720 --> 00:44:47,120 delivered on time and under budget. 1310 00:44:44,480 --> 00:44:49,040 You know, some of this this 1311 00:44:47,120 --> 00:44:50,840 law that we have to 1312 00:44:49,040 --> 00:44:52,840 comply with 1313 00:44:50,840 --> 00:44:54,560 is is a little cumbersome and 1314 00:44:52,840 --> 00:44:56,800 frustrating, 1315 00:44:54,560 --> 00:44:59,120 but you know, from from the time that we 1316 00:44:56,800 --> 00:45:00,600 start meeting with the with the 1317 00:44:59,120 --> 00:45:02,840 contractor, 1318 00:45:00,600 --> 00:45:05,840 there will definitely be you know, a lot 1319 00:45:02,840 --> 00:45:08,440 of emphasis on on um 1320 00:45:05,840 --> 00:45:11,760 keeping costs you know, within budget. 1321 00:45:08,440 --> 00:45:13,040 Um and if I mean you know, I I 1322 00:45:11,760 --> 00:45:14,720 to be fair, I think I think the 1323 00:45:13,040 --> 00:45:16,280 contractors probably get that from from 1324 00:45:14,720 --> 00:45:20,080 everybody that they all the cities that 1325 00:45:16,280 --> 00:45:21,440 they work with. Um But yeah, and I mean 1326 00:45:20,080 --> 00:45:23,440 you know, some of the costs, you know, 1327 00:45:21,440 --> 00:45:24,720 and I can I can point to some in on here 1328 00:45:23,440 --> 00:45:26,720 that's um 1329 00:45:24,720 --> 00:45:29,480 we anticipate 1330 00:45:26,720 --> 00:45:32,120 not not having to pay for example, 1331 00:45:29,480 --> 00:45:33,800 environmental mitigation costs. 1332 00:45:32,120 --> 00:45:34,359 BCDC 1333 00:45:33,800 --> 00:45:37,080 uh 1334 00:45:34,359 --> 00:45:40,480 may ask us to you know, mitigate for 1335 00:45:37,080 --> 00:45:43,120 much more than than we are already. Um 1336 00:45:40,480 --> 00:45:44,280 but it seems like they're not 1337 00:45:43,120 --> 00:45:45,880 um 1338 00:45:44,280 --> 00:45:47,200 in in our discussions with them so far, 1339 00:45:45,880 --> 00:45:49,400 they haven't said that they that they 1340 00:45:47,200 --> 00:45:50,440 will that they will and they've accepted 1341 00:45:49,400 --> 00:45:52,240 our 1342 00:45:50,440 --> 00:45:55,680 submission with with the mitigation that 1343 00:45:52,240 --> 00:45:56,960 we've proposed. Um So, 1344 00:45:55,680 --> 00:45:59,000 uh you know, for example there, there's 1345 00:45:56,960 --> 00:46:01,560 potential for that full 100,000 to be 1346 00:45:59,000 --> 00:46:04,480 available to be to be moved into another 1347 00:46:01,560 --> 00:46:06,240 sort of road. Um 1348 00:46:04,480 --> 00:46:08,040 Yeah. Um 1349 00:46:06,240 --> 00:46:09,720 Yeah, and then 1350 00:46:08,040 --> 00:46:11,960 you know, land surveying and mapping for 1351 00:46:09,720 --> 00:46:14,960 example, that's another item that's we 1352 00:46:11,960 --> 00:46:17,720 haven't we haven't had to Yeah, I you 1353 00:46:14,960 --> 00:46:19,800 know, I I I Yeah. You understand me. 1354 00:46:17,720 --> 00:46:22,200 Just as you prepare it, sharpen your 1355 00:46:19,800 --> 00:46:23,800 pencil in because you you know, come in 1356 00:46:22,200 --> 00:46:26,880 solution oriented to the council. 1357 00:46:23,800 --> 00:46:30,120 » Right. Right. Yeah. Yeah, okay. 1358 00:46:26,880 --> 00:46:30,120 Yeah, appreciate that. 1359 00:46:31,840 --> 00:46:35,320 Are you guys probably I mean 1360 00:46:33,840 --> 00:46:37,640 you've sat down with them. You've you've 1361 00:46:35,320 --> 00:46:39,320 you've you've met with them. Are you 1362 00:46:37,640 --> 00:46:41,280 comfortable with them being a partner in 1363 00:46:39,320 --> 00:46:42,400 in if not that it it doesn't sound like 1364 00:46:41,280 --> 00:46:43,200 it's a big job for them, but it's a big 1365 00:46:42,400 --> 00:46:44,560 job for us. 1366 00:46:43,200 --> 00:46:45,440 » Yeah, no, we haven't actually met with 1367 00:46:44,560 --> 00:46:47,600 them. 1368 00:46:45,440 --> 00:46:51,000 Yeah, we we wanted to but you know, I 1369 00:46:47,600 --> 00:46:54,600 actually I I spoke to 1370 00:46:51,000 --> 00:46:56,200 Gordon Ball yesterday on the phone. Um 1371 00:46:54,600 --> 00:46:59,000 And 1372 00:46:56,200 --> 00:47:01,520 um but we had wanted to have this 1373 00:46:59,000 --> 00:47:03,640 meeting before we you know, 1374 00:47:01,520 --> 00:47:06,120 provided any kind of official 1375 00:47:03,640 --> 00:47:08,720 communication to especially well, to the 1376 00:47:06,120 --> 00:47:10,840 other contractors. Um and it's obviously 1377 00:47:08,720 --> 00:47:12,680 not going to be an easy phone call with 1378 00:47:10,840 --> 00:47:15,760 Marcus, but um 1379 00:47:12,680 --> 00:47:17,040 yeah, that's So, Peter, I mean so 1380 00:47:15,760 --> 00:47:18,760 if we make a recommendation, we're 1381 00:47:17,040 --> 00:47:20,240 making a recommendation knowing it's 1382 00:47:18,760 --> 00:47:22,000 higher than the budget, although with 1383 00:47:20,240 --> 00:47:24,280 your mitigating 1384 00:47:22,000 --> 00:47:25,840 recommendations, it may be lower, but it 1385 00:47:24,280 --> 00:47:27,280 sounds like it's it's worth discussing 1386 00:47:25,840 --> 00:47:28,720 among the city council anyway. I mean 1387 00:47:27,280 --> 00:47:30,359 it's it's not so far out there. 1388 00:47:28,720 --> 00:47:32,040 » Absolutely. It's 1389 00:47:30,359 --> 00:47:33,000 it's achievable potentially. Well, I 1390 00:47:32,040 --> 00:47:34,840 mean 1391 00:47:33,000 --> 00:47:36,120 I mean I'm sure maybe Glenn you less so 1392 00:47:34,840 --> 00:47:38,080 than us, but we're 1393 00:47:36,120 --> 00:47:40,840 we're just all reacting to that like 1394 00:47:38,080 --> 00:47:42,200 public process is you know, I wouldn't 1395 00:47:40,840 --> 00:47:42,760 bid my house with that process. You 1396 00:47:42,200 --> 00:47:44,880 know, 1397 00:47:42,760 --> 00:47:47,160 and it's just a it's just a just a it's 1398 00:47:44,880 --> 00:47:48,960 sort of frustrating, but um 1399 00:47:47,160 --> 00:47:51,400 I think you need to present it that you 1400 00:47:48,960 --> 00:47:52,920 know, this is the process and and it's 1401 00:47:51,400 --> 00:47:54,960 not it's not unusual to have our 1402 00:47:52,920 --> 00:47:57,760 estimate be be a little bit short of the 1403 00:47:54,960 --> 00:48:00,200 of of the in fact, the dynamic of the of 1404 00:47:57,760 --> 00:48:02,280 the process to to to almost have that be 1405 00:48:00,200 --> 00:48:04,640 the the norm. 1406 00:48:02,280 --> 00:48:06,120 But there is an opportunity 1407 00:48:04,640 --> 00:48:07,760 and I and I do believe it's worth the 1408 00:48:06,120 --> 00:48:11,560 time because because we have a lot to do 1409 00:48:07,760 --> 00:48:12,600 between BCDC, PG&E and the easements um 1410 00:48:11,560 --> 00:48:14,560 which would at the end of the day if 1411 00:48:12,600 --> 00:48:15,600 those if those don't come through, 1412 00:48:14,560 --> 00:48:18,640 you know, this project's not going to go 1413 00:48:15,600 --> 00:48:21,120 ahead anyway. So, work aggressively with 1414 00:48:18,640 --> 00:48:22,200 with the selected contractor to and it's 1415 00:48:21,120 --> 00:48:23,680 not like we have much of a choice. We 1416 00:48:22,200 --> 00:48:26,240 have to choose 1417 00:48:23,680 --> 00:48:29,240 the non-eliminated low low bid, right? 1418 00:48:26,240 --> 00:48:30,840 Right. Yeah, and and I think 1419 00:48:29,240 --> 00:48:31,760 if if we're choosing if we're choosing 1420 00:48:30,840 --> 00:48:33,520 any, yeah. 1421 00:48:31,760 --> 00:48:35,880 Right, yeah, exactly. And and I I think 1422 00:48:33,520 --> 00:48:38,200 that you know, if if if there was 1423 00:48:35,880 --> 00:48:39,920 another close bid for example, and and 1424 00:48:38,200 --> 00:48:43,120 you know, there was a way to parse 1425 00:48:39,920 --> 00:48:44,000 through the qualifications, um then then 1426 00:48:43,120 --> 00:48:46,040 we might be having a different 1427 00:48:44,000 --> 00:48:48,160 conversation, but I think you know, we 1428 00:48:46,040 --> 00:48:49,680 have one apparently bidder. The the next 1429 00:48:48,160 --> 00:48:52,240 one is you know, 1430 00:48:49,680 --> 00:48:53,480 500,000. I mean you know, higher. I 1431 00:48:52,240 --> 00:48:54,600 touched on this last meeting, too, and I 1432 00:48:53,480 --> 00:48:57,640 know this will come up in the city 1433 00:48:54,600 --> 00:48:59,440 council is 1434 00:48:57,640 --> 00:49:03,280 and it's hard it's hard to weigh this 1435 00:48:59,440 --> 00:49:04,920 against known risk failure there, but is 1436 00:49:03,280 --> 00:49:06,280 this is this something that you know, in 1437 00:49:04,920 --> 00:49:07,600 a year or two might be might be better 1438 00:49:06,280 --> 00:49:09,480 pricing? 1439 00:49:07,600 --> 00:49:11,359 I'm not saying non-inflationary pricing, 1440 00:49:09,480 --> 00:49:13,120 but just better pricing relative to the 1441 00:49:11,359 --> 00:49:15,880 war, the supply chain issues, steel 1442 00:49:13,120 --> 00:49:17,880 prices, gas petroleum prices. Good good 1443 00:49:15,880 --> 00:49:19,440 question. And currently so far, we 1444 00:49:17,880 --> 00:49:21,720 actually 1445 00:49:19,440 --> 00:49:23,800 do a lot of supply chain analysis for 1446 00:49:21,720 --> 00:49:27,359 our projects nationwide. 1447 00:49:23,800 --> 00:49:31,640 So, right now I do know that most of the 1448 00:49:27,359 --> 00:49:34,400 sheet pile is coming from US. So, no 1449 00:49:31,640 --> 00:49:37,480 tariffs. So, that has not been impacted. 1450 00:49:34,400 --> 00:49:40,440 Currently, the price of oil has not 1451 00:49:37,480 --> 00:49:42,160 impacted the sheet pile pricing. And 1452 00:49:40,440 --> 00:49:44,000 that was something that, you know, once 1453 00:49:42,160 --> 00:49:45,840 we started to see what was happening in 1454 00:49:44,000 --> 00:49:47,960 around and that's typically one of the 1455 00:49:45,840 --> 00:49:49,680 first triggers is the price of oil will 1456 00:49:47,960 --> 00:49:51,080 just start to impact everything for 1457 00:49:49,680 --> 00:49:54,520 production and 1458 00:49:51,080 --> 00:49:56,360 specifically sheet pile. So, at this 1459 00:49:54,520 --> 00:49:59,680 point we don't foresee 1460 00:49:56,360 --> 00:50:02,280 any changes and we're that close that it 1461 00:49:59,680 --> 00:50:04,680 would be not a major escalation. We may 1462 00:50:02,280 --> 00:50:05,600 have more impacts if we push the project 1463 00:50:04,680 --> 00:50:07,440 and 1464 00:50:05,600 --> 00:50:10,000 you know, without 1465 00:50:07,440 --> 00:50:12,200 you know, we're talking, you know, two 1466 00:50:10,000 --> 00:50:14,240 years down the road we're probably Even 1467 00:50:12,200 --> 00:50:16,000 these folks these folks gave these bids, 1468 00:50:14,240 --> 00:50:17,160 you know, these orders are good. The 1469 00:50:16,000 --> 00:50:18,400 price associations have been two or 1470 00:50:17,160 --> 00:50:19,320 three weeks, right? Two three and a half 1471 00:50:18,400 --> 00:50:20,520 weeks. 1472 00:50:19,320 --> 00:50:21,800 Um 1473 00:50:20,520 --> 00:50:24,080 would it could or would they come back 1474 00:50:21,800 --> 00:50:26,120 and say there's a 10% premium based on 1475 00:50:24,080 --> 00:50:28,200 recent events? 1476 00:50:26,120 --> 00:50:31,040 They I do know that there there is a 1477 00:50:28,200 --> 00:50:32,160 level of like they are entitled to that, 1478 00:50:31,040 --> 00:50:33,440 but I don't know the specifics 1479 00:50:32,160 --> 00:50:34,680 personally to what that is. 1480 00:50:33,440 --> 00:50:36,480 » They could do that. They could come back 1481 00:50:34,680 --> 00:50:38,840 with a I'm not sure to the specifics. 1482 00:50:36,480 --> 00:50:40,520 So, it all depends on I think on the 1483 00:50:38,840 --> 00:50:43,160 specifics of the contract. I'm just not 1484 00:50:40,520 --> 00:50:44,474 fully aware they are, you know, entitled 1485 00:50:43,160 --> 00:50:45,480 to that. 1486 00:50:44,474 --> 00:50:47,520 » [clears throat] 1487 00:50:45,480 --> 00:50:49,200 » All the good scenario I mean as far as 1488 00:50:47,520 --> 00:50:51,360 whether the contract 1489 00:50:49,200 --> 00:50:52,800 Yeah, yeah, two or three two or three 1490 00:50:51,360 --> 00:50:55,080 as as as they go lower their price they 1491 00:50:52,800 --> 00:50:57,600 can ask us to raise the price. No, this 1492 00:50:55,080 --> 00:50:58,880 is what the contract would be. Yeah. 1493 00:50:57,600 --> 00:51:00,760 And that's yeah, they're they're hanging 1494 00:50:58,880 --> 00:51:02,640 their hat on that and knowing that okay, 1495 00:51:00,760 --> 00:51:04,720 well, you know, we have to 1496 00:51:02,640 --> 00:51:06,560 we get a word once, you know, supposed 1497 00:51:04,720 --> 00:51:07,800 to that we you know, move specifically 1498 00:51:06,560 --> 00:51:09,840 on the sheets that would be the big 1499 00:51:07,800 --> 00:51:11,520 thing. So, I mean if it's if it's if 1500 00:51:09,840 --> 00:51:13,520 it's 1501 00:51:11,520 --> 00:51:14,400 legitimately now a cost of theirs big 1502 00:51:13,520 --> 00:51:16,600 it's 1503 00:51:14,400 --> 00:51:17,840 choose not to take the contract, right? 1504 00:51:16,600 --> 00:51:19,080 Or the or are they obligated to take 1505 00:51:17,840 --> 00:51:21,280 this contract? 1506 00:51:19,080 --> 00:51:22,760 Well, they're I think yeah, they have 1507 00:51:21,280 --> 00:51:23,960 you Julian can speak to this as well. 1508 00:51:22,760 --> 00:51:25,360 Again, are they obligated or that's 1509 00:51:23,960 --> 00:51:29,440 where they're yeah, that's where we have 1510 00:51:25,360 --> 00:51:29,440 a bond. Mhm. A bid bond. 1511 00:51:29,760 --> 00:51:32,240 Yeah. 1512 00:51:31,635 --> 00:51:34,320 » [clears throat] 1513 00:51:32,240 --> 00:51:36,640 » Well, so this committee we were going to 1514 00:51:34,320 --> 00:51:38,840 make a recommendation. It sounds like 1515 00:51:36,640 --> 00:51:41,240 the staff's recommendation is to to 1516 00:51:38,840 --> 00:51:42,680 recommend city council to accept the bid 1517 00:51:41,240 --> 00:51:43,800 of Gordon 1518 00:51:42,680 --> 00:51:46,720 Ball. 1519 00:51:43,800 --> 00:51:48,680 Um are we ready to decide on that with 1520 00:51:46,720 --> 00:51:51,520 the committee? I don't know how we what 1521 00:51:48,680 --> 00:51:54,120 do we further questions or discussion? 1522 00:51:51,520 --> 00:51:57,400 I would I would 1523 00:51:54,120 --> 00:51:59,080 edit that a bit in the sense that 1524 00:51:57,400 --> 00:52:00,760 it's not this committee's decision to go 1525 00:51:59,080 --> 00:52:02,480 ahead with the project. 1526 00:52:00,760 --> 00:52:04,440 Right? From a from a broader risk 1527 00:52:02,480 --> 00:52:06,080 perspective from a broader financing 1528 00:52:04,440 --> 00:52:08,040 perspective and from a broader um 1529 00:52:06,080 --> 00:52:09,760 operations perspective. But in in the 1530 00:52:08,040 --> 00:52:11,440 event the council is clearly said to us 1531 00:52:09,760 --> 00:52:14,800 at a retreat hence the formation of this 1532 00:52:11,440 --> 00:52:16,120 committee is um 1533 00:52:14,800 --> 00:52:18,160 we want this project to go forward. It 1534 00:52:16,120 --> 00:52:19,840 should it go forward we want you to do 1535 00:52:18,160 --> 00:52:21,320 the proper due diligence and proper 1536 00:52:19,840 --> 00:52:23,000 transparency to make sure that it's done 1537 00:52:21,320 --> 00:52:24,080 in a fair equitable manner and that 1538 00:52:23,000 --> 00:52:25,680 you're getting as much value for the 1539 00:52:24,080 --> 00:52:26,640 process as possible. 1540 00:52:25,680 --> 00:52:28,920 I think we should that's what we should 1541 00:52:26,640 --> 00:52:29,920 say is that given the process and given 1542 00:52:28,920 --> 00:52:31,200 the understanding of the project and the 1543 00:52:29,920 --> 00:52:32,600 scope, 1544 00:52:31,200 --> 00:52:33,840 this is the best contract for the job 1545 00:52:32,600 --> 00:52:35,520 and given the conditions that we talked 1546 00:52:33,840 --> 00:52:36,920 about a second ago that you're going to 1547 00:52:35,520 --> 00:52:39,280 post awarding of the contract value 1548 00:52:36,920 --> 00:52:42,240 engineer and look for look look for 1549 00:52:39,280 --> 00:52:42,880 potential values in the scope itself and 1550 00:52:42,240 --> 00:52:43,960 um 1551 00:52:42,880 --> 00:52:45,560 here are ways we can potentially 1552 00:52:43,960 --> 00:52:48,120 mitigate the cost in the existing 1553 00:52:45,560 --> 00:52:51,600 budgets or other budgets. Um that's the 1554 00:52:48,120 --> 00:52:52,040 recommendation to choose Gordon Ball. 1555 00:52:51,600 --> 00:52:53,120 What is it the 1556 00:52:52,040 --> 00:52:54,440 » Yeah, I think it should be yeah. We're 1557 00:52:53,120 --> 00:52:56,040 not saying the project should go ahead 1558 00:52:54,440 --> 00:52:57,760 with this. Ultimately, 1559 00:52:56,040 --> 00:52:59,200 you know, five people up there with 1560 00:52:57,760 --> 00:53:01,360 public comment are going to decide 1561 00:52:59,200 --> 00:53:03,760 whether this is this this, you know, 1562 00:53:01,360 --> 00:53:05,320 $4.6 million is something the city sees 1563 00:53:03,760 --> 00:53:06,600 a priority for the next, you know, year 1564 00:53:05,320 --> 00:53:09,720 and a half to 1565 00:53:06,600 --> 00:53:13,080 to mitigate this risk. Yeah. Yeah. 1566 00:53:09,720 --> 00:53:15,760 Um so it sounds like it it's um 1567 00:53:13,080 --> 00:53:18,760 on the understanding that there will be 1568 00:53:15,760 --> 00:53:21,000 you know, aggressive um 1569 00:53:18,760 --> 00:53:22,640 uh 1570 00:53:21,000 --> 00:53:25,800 what 1571 00:53:22,640 --> 00:53:27,760 I don't want to say reduction in cost 1572 00:53:25,800 --> 00:53:30,120 I mean, you know, you know the people up 1573 00:53:27,760 --> 00:53:31,360 there myself and and what I mean 1574 00:53:30,120 --> 00:53:33,480 they're going to say, you know, find a 1575 00:53:31,360 --> 00:53:34,680 place, you know, figure out the 315, 1576 00:53:33,480 --> 00:53:36,520 right? You know, we'd rather not have 1577 00:53:34,680 --> 00:53:38,280 that. We'd rather we'd rather you, you 1578 00:53:36,520 --> 00:53:39,560 know, get it out of the get it out of 1579 00:53:38,280 --> 00:53:40,760 the project one way or the other, you 1580 00:53:39,560 --> 00:53:42,840 know, either sharpen your pencil from a 1581 00:53:40,760 --> 00:53:45,360 scope perspective, value engineer it or 1582 00:53:42,840 --> 00:53:47,440 if you have to do exactly what what what 1583 00:53:45,360 --> 00:53:49,800 you guys talked about is is, you know, 1584 00:53:47,440 --> 00:53:51,600 take a portion that that's responsible 1585 00:53:49,800 --> 00:53:53,080 of a paving and a sidewalk budget or 1586 00:53:51,600 --> 00:53:55,520 other public works budgets and apply it 1587 00:53:53,080 --> 00:53:56,960 to this recognizing that you're you're 1588 00:53:55,520 --> 00:53:59,440 you're you're stealing from Peter to pay 1589 00:53:56,960 --> 00:54:01,640 Paul, but but be confident that you're 1590 00:53:59,440 --> 00:54:03,120 you're doing that in a in a in a in a 1591 00:54:01,640 --> 00:54:05,480 balanced way that you're not 1592 00:54:03,120 --> 00:54:06,440 jeopardizing Paul in that scenario. 1593 00:54:05,480 --> 00:54:09,720 They're going to want to see that 1594 00:54:06,440 --> 00:54:10,880 information. Right. Yeah. Yeah. 1595 00:54:09,720 --> 00:54:12,240 And and just just be confident that you 1596 00:54:10,880 --> 00:54:14,000 thought about it so that if you're not 1597 00:54:12,240 --> 00:54:15,400 able to lower the price 1598 00:54:14,000 --> 00:54:17,960 that we're not we don't have a, you 1599 00:54:15,400 --> 00:54:19,359 know, day one $315,000 1600 00:54:17,960 --> 00:54:20,720 hit to this budget. You don't want to go 1601 00:54:19,359 --> 00:54:23,359 through a project day one with that kind 1602 00:54:20,720 --> 00:54:24,560 of, you know, budget deficit. 1603 00:54:23,359 --> 00:54:25,680 » For sure. 1604 00:54:24,560 --> 00:54:27,280 Um 1605 00:54:25,680 --> 00:54:28,640 Yeah, absolutely. I mean, I I 1606 00:54:27,280 --> 00:54:30,280 » Help you with the staff report too. I 1607 00:54:28,640 --> 00:54:31,680 mean, like I'm don't stress about that. 1608 00:54:30,280 --> 00:54:33,720 Between Robert, you and me and Helga we 1609 00:54:31,680 --> 00:54:35,800 can figure out how to Yeah. write that 1610 00:54:33,720 --> 00:54:38,760 up. Yeah, that that 1611 00:54:35,800 --> 00:54:40,240 I really appreciate that. Um 1612 00:54:38,760 --> 00:54:41,280 Yeah, and and I think I think part of 1613 00:54:40,240 --> 00:54:42,359 the 1614 00:54:41,280 --> 00:54:43,800 um 1615 00:54:42,359 --> 00:54:45,800 you know, one of the questions that that 1616 00:54:43,800 --> 00:54:48,400 we'd have for you is is uh whether you 1617 00:54:45,800 --> 00:54:51,359 think, you know, where would be a more 1618 00:54:48,400 --> 00:54:54,400 appropriate um place to to look for um 1619 00:54:51,359 --> 00:54:56,400 savings uh and yeah, so 1620 00:54:54,400 --> 00:54:58,880 you know, see our existing CIP funds 1621 00:54:56,400 --> 00:55:00,520 versus scope of the projects and um 1622 00:54:58,880 --> 00:55:03,040 yeah, these kind of Well, that's kind of 1623 00:55:00,520 --> 00:55:06,280 a contract. I mean, I mean, yes 1624 00:55:03,040 --> 00:55:08,680 the the city can start with, you know, 1625 00:55:06,280 --> 00:55:10,400 what what what what um 1626 00:55:08,680 --> 00:55:11,720 parks and lanes what what what broader 1627 00:55:10,400 --> 00:55:13,760 public works infrastructure are you 1628 00:55:11,720 --> 00:55:15,120 doing that one you don't think you're 1629 00:55:13,760 --> 00:55:16,680 going to get to. Every year we don't get 1630 00:55:15,120 --> 00:55:19,359 to projects, right? That happens all the 1631 00:55:16,680 --> 00:55:20,520 time. So so so so 1632 00:55:19,359 --> 00:55:21,960 figure out which are the ones we don't 1633 00:55:20,520 --> 00:55:25,600 think we're going to get to 1634 00:55:21,960 --> 00:55:28,960 and roll that into '27 '28 or '26 '27 or 1635 00:55:25,600 --> 00:55:30,120 even '26 '27 '27 '28 and that's that's a 1636 00:55:28,960 --> 00:55:33,440 that's appropriate that potentially 1637 00:55:30,120 --> 00:55:34,760 could be used um for this recognizing 1638 00:55:33,440 --> 00:55:36,560 you're just kicking a can down the road. 1639 00:55:34,760 --> 00:55:38,560 It's not a savings, but 1640 00:55:36,560 --> 00:55:41,359 but it's a new public works budget next 1641 00:55:38,560 --> 00:55:43,280 year. Right. Yeah, exactly. And and if 1642 00:55:41,359 --> 00:55:44,600 through your personal or a professional 1643 00:55:43,280 --> 00:55:45,680 assessment 1644 00:55:44,600 --> 00:55:47,640 that 1645 00:55:45,680 --> 00:55:49,480 project can be deferred for that amount 1646 00:55:47,640 --> 00:55:50,760 of time. I mean, that's got to be part 1647 00:55:49,480 --> 00:55:52,280 of it as well. 1648 00:55:50,760 --> 00:55:54,200 Yes, exactly. And I think I actually 1649 00:55:52,280 --> 00:55:55,760 didn't get to that part of when I was 1650 00:55:54,200 --> 00:55:58,160 talking about the CIPs and the and the 1651 00:55:55,760 --> 00:55:59,720 paving um yeah, the It's got to be based 1652 00:55:58,160 --> 00:56:01,200 on some assessment 1653 00:55:59,720 --> 00:56:02,640 Well, exactly. Yeah, 1654 00:56:01,200 --> 00:56:04,720 I mean, because there are as you say 1655 00:56:02,640 --> 00:56:07,000 projects that roll over every year and 1656 00:56:04,720 --> 00:56:09,720 there are also, you know, sort of 1657 00:56:07,000 --> 00:56:12,359 forecast funds for 1658 00:56:09,720 --> 00:56:13,880 for for different projects that you 1659 00:56:12,359 --> 00:56:16,200 know, won't be used for one reason or 1660 00:56:13,880 --> 00:56:18,520 another and and can be pushed off to the 1661 00:56:16,200 --> 00:56:19,400 following year. Yeah. 1662 00:56:18,520 --> 00:56:21,120 And we'll just see if there are any I 1663 00:56:19,400 --> 00:56:22,680 see Patrick has joined. If there are 1664 00:56:21,120 --> 00:56:23,960 comments from Patrick or any I don't 1665 00:56:22,680 --> 00:56:26,440 know if there are any other Robert or 1666 00:56:23,960 --> 00:56:27,880 Rob or Glenn or anyone else who might 1667 00:56:26,440 --> 00:56:30,160 not have a chance to speak about this 1668 00:56:27,880 --> 00:56:30,160 and 1669 00:56:30,640 --> 00:56:34,720 Robert, Patrick, Glenn, any 1670 00:56:35,960 --> 00:56:36,880 Hey, 1671 00:56:36,869 --> 00:56:38,720 » [clears throat] 1672 00:56:36,880 --> 00:56:40,080 » I can go ahead and comment. I've just 1673 00:56:38,720 --> 00:56:41,560 been listening to this 1674 00:56:40,080 --> 00:56:44,240 well, to the whole conversation, but on 1675 00:56:41,560 --> 00:56:46,280 this last part we we did actually meet 1676 00:56:44,240 --> 00:56:49,240 Tony, myself and Helga and take a look 1677 00:56:46,280 --> 00:56:51,200 at our 20 our current budget in terms of 1678 00:56:49,240 --> 00:56:53,920 rollover and then what we're looking at 1679 00:56:51,200 --> 00:56:55,720 for next year in terms of projects that 1680 00:56:53,920 --> 00:56:58,560 have funds assigned, but not necessarily 1681 00:56:55,720 --> 00:57:00,920 a project earmarked for those funds. So, 1682 00:56:58,560 --> 00:57:02,440 I think there um you know, to Peter and 1683 00:57:00,920 --> 00:57:04,320 and Tony to your point there is enough 1684 00:57:02,440 --> 00:57:06,120 flexibility in the next, you know, this 1685 00:57:04,320 --> 00:57:07,920 current year and next year 1686 00:57:06,120 --> 00:57:10,600 we need to we we can find a way to pay 1687 00:57:07,920 --> 00:57:12,680 for this 315. Um but but the broader 1688 00:57:10,600 --> 00:57:14,080 point is let's let's work really hard 1689 00:57:12,680 --> 00:57:15,600 and try and bring the cost down, which 1690 00:57:14,080 --> 00:57:18,120 is of course what we'll present to city 1691 00:57:15,600 --> 00:57:18,120 council. 1692 00:57:21,800 --> 00:57:25,480 Yeah, 1693 00:57:22,800 --> 00:57:27,359 and so and this is just Robbie, you've 1694 00:57:25,480 --> 00:57:28,200 just reminded me of another thing that's 1695 00:57:27,359 --> 00:57:30,640 um 1696 00:57:28,200 --> 00:57:34,000 we would like to emphasize is that we 1697 00:57:30,640 --> 00:57:35,480 have no plans to request more funds from 1698 00:57:34,000 --> 00:57:37,200 from reserves 1699 00:57:35,480 --> 00:57:38,800 uh from general fund or critical 1700 00:57:37,200 --> 00:57:41,160 infrastructure reserves. 1701 00:57:38,800 --> 00:57:43,320 Um the you know, all the all the cost 1702 00:57:41,160 --> 00:57:46,480 savings would come from existing and 1703 00:57:43,320 --> 00:57:47,640 forecast funds and from the projects 1704 00:57:46,480 --> 00:57:49,040 itself. 1705 00:57:47,640 --> 00:57:50,720 Yeah. 1706 00:57:49,040 --> 00:57:53,200 That's a bit that's that's 1707 00:57:50,720 --> 00:57:54,240 sort of splitting hairs because it's 1708 00:57:53,200 --> 00:57:55,440 Well, 1709 00:57:54,240 --> 00:57:56,080 it's just going to be it really comes 1710 00:57:55,440 --> 00:57:57,720 from the city 1711 00:57:56,080 --> 00:57:59,080 » All all the same funds. So, it's a 1712 00:57:57,720 --> 00:58:00,120 matter of Right. 1713 00:57:59,080 --> 00:58:02,680 » Whether it's 1714 00:58:00,120 --> 00:58:05,359 in an existing appropriation or not. 1715 00:58:02,680 --> 00:58:07,240 Right. Yeah, yeah, no, absolutely. We 1716 00:58:05,359 --> 00:58:08,080 can't print money. So, it's it's at the 1717 00:58:07,240 --> 00:58:11,160 end of the day it's coming from 1718 00:58:08,080 --> 00:58:12,359 something or we're not doing something. 1719 00:58:11,160 --> 00:58:14,800 Oh, yeah, exactly. We're putting 1720 00:58:12,359 --> 00:58:17,080 deferring something or yeah. But I I I 1721 00:58:14,800 --> 00:58:19,240 think Robert said it exactly right and 1722 00:58:17,080 --> 00:58:20,359 Yeah. we can we can endeavor to to make 1723 00:58:19,240 --> 00:58:21,520 that presentation and I'll and I'll 1724 00:58:20,359 --> 00:58:23,200 certainly 1725 00:58:21,520 --> 00:58:25,359 be part of that and help explain it to 1726 00:58:23,200 --> 00:58:27,920 the council as we go forward. 1727 00:58:25,359 --> 00:58:29,359 Yeah, well, thank you. Yeah. 1728 00:58:27,920 --> 00:58:31,320 Okay, well, there's no further 1729 00:58:29,359 --> 00:58:33,080 discussion. It seems like we should try 1730 00:58:31,320 --> 00:58:35,800 and bring our our committee's 1731 00:58:33,080 --> 00:58:38,200 recommendation to our to a vote and 1732 00:58:35,800 --> 00:58:39,400 I think the movement is that the sub 1733 00:58:38,200 --> 00:58:41,440 committee 1734 00:58:39,400 --> 00:58:42,680 will vote to 1735 00:58:41,440 --> 00:58:44,080 um 1736 00:58:42,680 --> 00:58:46,480 I guess 1737 00:58:44,080 --> 00:58:49,040 that the vote along with the the staff 1738 00:58:46,480 --> 00:58:51,320 has made the proper recommendation to 1739 00:58:49,040 --> 00:58:53,600 the city council subject to the 1740 00:58:51,320 --> 00:58:57,040 adjustments and sort of 1741 00:58:53,600 --> 00:58:58,359 financing and payment. Um 1742 00:58:57,040 --> 00:59:00,120 and I I I guess we're not quite 1743 00:58:58,359 --> 00:59:01,720 endorsing that the the committee should 1744 00:59:00,120 --> 00:59:03,120 do this, but the committee supports the 1745 00:59:01,720 --> 00:59:05,200 staff's recommendation. I think you said 1746 00:59:03,120 --> 00:59:07,680 it exactly right that that that we we 1747 00:59:05,200 --> 00:59:09,440 support the recommendation of the of the 1748 00:59:07,680 --> 00:59:11,600 city staff that 1749 00:59:09,440 --> 00:59:13,400 Gordon Ball is the is is the contractor 1750 00:59:11,600 --> 00:59:14,240 to select and that 1751 00:59:13,400 --> 00:59:16,359 um 1752 00:59:14,240 --> 00:59:18,640 uh we encourage the the staff in the 1753 00:59:16,359 --> 00:59:19,640 presentation to city council to to focus 1754 00:59:18,640 --> 00:59:21,800 on 1755 00:59:19,640 --> 00:59:24,320 you know, value engineering and and and 1756 00:59:21,800 --> 00:59:25,480 scope considerations and then identify 1757 00:59:24,320 --> 00:59:27,880 where the 1758 00:59:25,480 --> 00:59:30,320 surplus $315,000 can come from within 1759 00:59:27,880 --> 00:59:32,160 existing budgets. 1760 00:59:30,320 --> 00:59:34,160 I was um [clears throat] may I move into 1761 00:59:32,160 --> 00:59:35,880 the vote on that? 1762 00:59:34,160 --> 00:59:38,840 Uh second that. 1763 00:59:35,880 --> 00:59:40,800 I can second that. And all all in favor, 1764 00:59:38,840 --> 00:59:42,800 I 1765 00:59:40,800 --> 00:59:44,520 I think it's just the three of us 1766 00:59:42,800 --> 00:59:46,640 Well, thank you. Yeah, and hopefully the 1767 00:59:44,520 --> 00:59:48,360 the speaker caught all of the 1768 00:59:46,640 --> 00:59:49,680 caught all of the language in there. 1769 00:59:48,360 --> 00:59:50,920 It's much better than the last one, I 1770 00:59:49,680 --> 00:59:52,560 know that. 1771 00:59:50,920 --> 00:59:53,560 Um so, the microphone of the speaker, 1772 00:59:52,560 --> 00:59:55,440 yeah. 1773 00:59:53,560 --> 00:59:57,240 And so, this may be the final time we'll 1774 00:59:55,440 --> 00:59:59,160 have to meet, I guess maybe subject to 1775 00:59:57,240 --> 01:00:01,760 Yeah, I don't know. 1776 00:59:59,160 --> 01:00:05,600 Robert, remind me, do we think it makes 1777 01:00:01,760 --> 01:00:07,560 sense to because because there's still 1778 01:00:05,600 --> 01:00:08,720 as you mentioned between BCDC, Genie, 1779 01:00:07,560 --> 01:00:11,840 and the 1780 01:00:08,720 --> 01:00:14,400 easements and the ultimate, you know, 1781 01:00:11,840 --> 01:00:16,960 issues of permits and getting going. Uh 1782 01:00:14,400 --> 01:00:19,480 and and after all, this committee 1783 01:00:16,960 --> 01:00:21,160 is designed to be the eyes and ears of 1784 01:00:19,480 --> 01:00:22,400 the community just just just just to 1785 01:00:21,160 --> 01:00:23,960 understand and, you know, either 1786 01:00:22,400 --> 01:00:25,560 anecdotally or or publicly make a 1787 01:00:23,960 --> 01:00:27,720 comment that, you know, we've been aware 1788 01:00:25,560 --> 01:00:29,080 of what's going on. I'd suggest another 1789 01:00:27,720 --> 01:00:31,000 in, you know, 1790 01:00:29,080 --> 01:00:32,400 if not one or two month at monthly 1791 01:00:31,000 --> 01:00:34,000 intervals, just to check in where you 1792 01:00:32,400 --> 01:00:36,200 are in this process 1793 01:00:34,000 --> 01:00:37,280 um so that the next month you presumably 1794 01:00:36,200 --> 01:00:39,440 would have received city council 1795 01:00:37,280 --> 01:00:41,880 approval, you presumably would have 1796 01:00:39,440 --> 01:00:43,480 engaged in a contract with Gordon Ball, 1797 01:00:41,880 --> 01:00:45,280 and have those initial discussions, and 1798 01:00:43,480 --> 01:00:47,000 have a tentative timeline for the 1799 01:00:45,280 --> 01:00:48,480 project. That would be So, in about a 1800 01:00:47,000 --> 01:00:50,160 month's time from now That's what I 1801 01:00:48,480 --> 01:00:51,320 think unless you think that's that's too 1802 01:00:50,160 --> 01:00:52,800 soon. 1803 01:00:51,320 --> 01:00:56,080 Um 1804 01:00:52,800 --> 01:00:58,560 No, I think I think there would be uh 1805 01:00:56,080 --> 01:01:01,360 quite a few there'd be a few updates in 1806 01:00:58,560 --> 01:01:03,560 a month's time. Um and we can 1807 01:01:01,360 --> 01:01:04,880 possibly, you know, change the date if 1808 01:01:03,560 --> 01:01:06,720 if we need to if we're waiting on for 1809 01:01:04,880 --> 01:01:08,560 some, you know, some 1810 01:01:06,720 --> 01:01:12,480 um decision or something. Robert, that's 1811 01:01:08,560 --> 01:01:16,400 not surpassing the the the um 1812 01:01:12,480 --> 01:01:18,480 charter or design of this subcommittee? 1813 01:01:16,400 --> 01:01:20,800 No, the the subcommittee is ad hoc. We 1814 01:01:18,480 --> 01:01:23,600 can't exist forever. Um but if we have a 1815 01:01:20,800 --> 01:01:24,960 clear ending point which may align 1816 01:01:23,600 --> 01:01:27,680 you know, with the duration of the 1817 01:01:24,960 --> 01:01:29,400 project and maybe at the close out uh 1818 01:01:27,680 --> 01:01:31,080 we'll have a final report that goes back 1819 01:01:29,400 --> 01:01:33,040 to council. I think that's still the 1820 01:01:31,080 --> 01:01:35,480 scope. Yeah, I would agree. I think it'd 1821 01:01:33,040 --> 01:01:36,880 be good to meet in another month. 1822 01:01:35,480 --> 01:01:38,400 And actually maybe throughout the until 1823 01:01:36,880 --> 01:01:39,800 the project is completed I absolutely We 1824 01:01:38,400 --> 01:01:42,080 discussed even having maybe one 1825 01:01:39,800 --> 01:01:44,600 committee member available for whether 1826 01:01:42,080 --> 01:01:47,320 it be every construction meeting, but at 1827 01:01:44,600 --> 01:01:49,680 least it's certainly up to speed whether 1828 01:01:47,320 --> 01:01:51,120 it's even also a follow-up after our 1829 01:01:49,680 --> 01:01:52,640 construction meeting with the 1830 01:01:51,120 --> 01:01:54,560 contractor. I'm under the impression 1831 01:01:52,640 --> 01:01:56,520 we'll be doing those weekly. Could be a 1832 01:01:54,560 --> 01:01:58,080 bi-weekly check-in or something of that 1833 01:01:56,520 --> 01:02:00,440 nature, but I think that it's very 1834 01:01:58,080 --> 01:02:02,160 important to keep you guys in the loop 1835 01:02:00,440 --> 01:02:04,080 throughout the process, too. You know, 1836 01:02:02,160 --> 01:02:05,280 we'll also have the have the contract 1837 01:02:04,080 --> 01:02:07,040 happening, 1838 01:02:05,280 --> 01:02:08,880 it sounds like. So, you'll you'll bring 1839 01:02:07,040 --> 01:02:13,200 this to council in April? 1840 01:02:08,880 --> 01:02:14,600 Yes. Yeah, that is the plan. Okay. Yeah. 1841 01:02:13,200 --> 01:02:16,920 Um 1842 01:02:14,600 --> 01:02:18,360 Yeah, so April 13th 1843 01:02:16,920 --> 01:02:20,120 um and 1844 01:02:18,360 --> 01:02:21,800 yeah, unfortunately, I'm going to be out 1845 01:02:20,120 --> 01:02:26,200 of town for a couple of weeks here, but 1846 01:02:21,800 --> 01:02:29,080 I have the the draft staff report and um 1847 01:02:26,200 --> 01:02:31,440 you know, uh I think the finance the 1848 01:02:29,080 --> 01:02:33,160 fiscal impact section is is the part we 1849 01:02:31,440 --> 01:02:35,480 need to um 1850 01:02:33,160 --> 01:02:37,400 drill down into. Yeah. 1851 01:02:35,480 --> 01:02:39,000 But uh 1852 01:02:37,400 --> 01:02:40,680 yeah, that and hopefully the 1853 01:02:39,000 --> 01:02:43,480 construction easements 1854 01:02:40,680 --> 01:02:44,680 and maybe even a contract for the other 1855 01:02:43,480 --> 01:02:46,680 portion of the work if that can all 1856 01:02:44,680 --> 01:02:49,120 happen in in in April, 1857 01:02:46,680 --> 01:02:51,440 uh that would be There's no bid 1858 01:02:49,120 --> 01:02:52,240 requirement for that? Is that the bid 1859 01:02:51,440 --> 01:02:54,240 threshold or something? They would 1860 01:02:52,240 --> 01:02:57,040 typically be, yes, 1861 01:02:54,240 --> 01:02:58,400 but there is in this case 1862 01:02:57,040 --> 01:03:00,320 what's called a sole source 1863 01:02:58,400 --> 01:03:03,720 justification 1864 01:03:00,320 --> 01:03:06,000 for for this for this contract 1865 01:03:03,720 --> 01:03:07,040 because they have specialized 1866 01:03:06,000 --> 01:03:08,360 knowledge of that company. 1867 01:03:07,040 --> 01:03:12,720 » Installed it. 1868 01:03:08,360 --> 01:03:12,720 Yes, exactly. Yeah. Yeah. 1869 01:03:12,840 --> 01:03:15,840 Yeah, and 1870 01:03:14,720 --> 01:03:17,480 but that's, you know, these are all 1871 01:03:15,840 --> 01:03:19,360 updates that can can come at the next 1872 01:03:17,480 --> 01:03:21,040 meeting for sure. Yeah. Okay, so we'll 1873 01:03:19,360 --> 01:03:23,000 plan on having a meeting probably late 1874 01:03:21,040 --> 01:03:25,680 April after the city council meeting and 1875 01:03:23,000 --> 01:03:26,960 after progress has been made. Um 1876 01:03:25,680 --> 01:03:29,040 and then we'll see 1877 01:03:26,960 --> 01:03:30,960 periodically after after that. Um would 1878 01:03:29,040 --> 01:03:32,040 you like to pencil in a date now that we 1879 01:03:30,960 --> 01:03:32,720 can 1880 01:03:32,040 --> 01:03:35,360 uh 1881 01:03:32,720 --> 01:03:38,480 or or uh 1882 01:03:35,360 --> 01:03:40,600 Would you Yeah. prefer to to wait and 1883 01:03:38,480 --> 01:03:42,840 have a a poll maybe further down the 1884 01:03:40,600 --> 01:03:44,800 line? If we if we sort of have a a 1885 01:03:42,840 --> 01:03:46,840 target date that we are, you know, can 1886 01:03:44,800 --> 01:03:48,120 then confirm, I think um 1887 01:03:46,840 --> 01:03:50,560 All right, for me that always seems to 1888 01:03:48,120 --> 01:03:53,760 work work better. 1889 01:03:50,560 --> 01:03:55,880 So, maybe the week of the 27th? 1890 01:03:53,760 --> 01:03:57,680 Okay. 1891 01:03:55,880 --> 01:03:59,000 I'm gone that whole week. 1892 01:03:57,680 --> 01:04:02,040 Are you there the week of the 20th? I'm 1893 01:03:59,000 --> 01:04:02,040 there the 20th. 1894 01:04:02,359 --> 01:04:08,160 I I'm here the week of the 20th. 1895 01:04:05,880 --> 01:04:09,120 When does city council act? Uh you said 1896 01:04:08,160 --> 01:04:12,040 it was the 1897 01:04:09,120 --> 01:04:13,720 13th. 13th, yeah. So, that's great. 1898 01:04:12,040 --> 01:04:15,440 So, that's a week after the city council 1899 01:04:13,720 --> 01:04:17,400 meeting. But you might not have made 1900 01:04:15,440 --> 01:04:18,600 much progress with the contract. Yeah, 1901 01:04:17,400 --> 01:04:20,160 it might be a little soon. Might shoot 1902 01:04:18,600 --> 01:04:21,680 for beginning of May, like the week of 1903 01:04:20,160 --> 01:04:23,520 the 4th. Early May might be better. I'm 1904 01:04:21,680 --> 01:04:26,040 away the week of the 4th, so I can do 1905 01:04:23,520 --> 01:04:26,040 the Monday or Tuesday. 1906 01:04:26,720 --> 01:04:29,880 And there's always, you know, we can 1907 01:04:28,359 --> 01:04:31,440 there's no reason this for emailing 1908 01:04:29,880 --> 01:04:32,480 communication Personally, I could I 1909 01:04:31,440 --> 01:04:34,200 could join a Zoom call. 1910 01:04:32,480 --> 01:04:35,840 » Or even a remote call if that's Yeah. 1911 01:04:34,200 --> 01:04:37,400 Yeah, I know it works for you. I guess 1912 01:04:35,840 --> 01:04:39,280 it would do we if we're not voting on 1913 01:04:37,400 --> 01:04:41,160 things necessarily, we don't have to all 1914 01:04:39,280 --> 01:04:42,440 be present, correct? And 1915 01:04:41,160 --> 01:04:43,880 I don't know what the or can we not have 1916 01:04:42,440 --> 01:04:46,960 a meeting? It's not a Brown Act, I don't 1917 01:04:43,880 --> 01:04:46,960 believe. Right, Robert? 1918 01:04:47,720 --> 01:04:50,880 That is correct. I don't believe this is 1919 01:04:49,440 --> 01:04:53,800 a Brown Act. I don't believe 1920 01:04:50,880 --> 01:04:55,440 So, I mean If this same group is meeting 1921 01:04:53,800 --> 01:04:57,320 Sorry, sorry. If this same group is 1922 01:04:55,440 --> 01:04:58,600 meeting meeting the 1923 01:04:57,320 --> 01:05:00,480 you know, the the core group that we 1924 01:04:58,600 --> 01:05:02,440 have here today, then it is a Brown Act 1925 01:05:00,480 --> 01:05:04,080 meeting. If it's just one person 1926 01:05:02,440 --> 01:05:06,560 assigned to meet with staff and what's 1927 01:05:04,080 --> 01:05:06,560 not 1928 01:05:06,800 --> 01:05:09,720 Well, I I guess our question, Robert, is 1929 01:05:08,520 --> 01:05:11,320 if 1930 01:05:09,720 --> 01:05:13,760 we couldn't do this as a complete remote 1931 01:05:11,320 --> 01:05:13,760 meeting. 1932 01:05:15,240 --> 01:05:18,560 Right, we need to have a quorum. Then 1933 01:05:16,800 --> 01:05:20,760 then the majority a majority of the 1934 01:05:18,560 --> 01:05:22,320 members have to be in person. 1935 01:05:20,760 --> 01:05:23,400 It worked out today because only one 1936 01:05:22,320 --> 01:05:25,320 person 1937 01:05:23,400 --> 01:05:28,840 member of that sub of the subcommittee 1938 01:05:25,320 --> 01:05:30,960 was was connected remotely. 1939 01:05:28,840 --> 01:05:32,840 Do we want to shoot for say Wednesday 1940 01:05:30,960 --> 01:05:34,680 the 6th and 1941 01:05:32,840 --> 01:05:36,640 if John can't I did do it remotely, but 1942 01:05:34,680 --> 01:05:39,240 I'm happy to do that remotely. Yeah, 1943 01:05:36,640 --> 01:05:41,760 sure. Let's do that. Okay. Let's May the 1944 01:05:39,240 --> 01:05:41,760 6th. 1945 01:05:43,680 --> 01:05:51,320 2 2 p.m. Or sorry, 1 p.m. 1946 01:05:47,520 --> 01:05:54,600 Yeah, if that time works for everyone. 1947 01:05:51,320 --> 01:05:54,600 Keep it consistent, I guess. 1948 01:05:55,720 --> 01:05:59,280 Okay. 1949 01:05:57,680 --> 01:06:01,000 All right, I just need to raise one 1950 01:05:59,280 --> 01:06:03,640 point. 1951 01:06:01,000 --> 01:06:05,120 Yes, a design point. Yeah, uh go ahead. 1952 01:06:03,640 --> 01:06:07,960 Yeah, that's okay. 1953 01:06:05,120 --> 01:06:09,680 So, this is addressed to Stetson. 1954 01:06:07,960 --> 01:06:11,680 Uh has to do with the height of the 1955 01:06:09,680 --> 01:06:13,760 sheet piling. 1956 01:06:11,680 --> 01:06:15,560 Larry's question to you apparently was 1957 01:06:13,760 --> 01:06:18,200 misunderstood. 1958 01:06:15,560 --> 01:06:20,480 He's asking why not 1959 01:06:18,200 --> 01:06:20,880 maintain the level the 1960 01:06:20,480 --> 01:06:25,000 » [clears throat] 1961 01:06:20,880 --> 01:06:25,000 » Same as the existing sheet piling. 1962 01:06:25,120 --> 01:06:28,600 Oh, the 2019 sheet piling, the top of 1963 01:06:27,600 --> 01:06:29,080 it. 1964 01:06:28,600 --> 01:06:32,359 Um 1965 01:06:29,080 --> 01:06:35,000 » Maintaining that height. It was It was 1966 01:06:32,359 --> 01:06:38,440 primarily to save cost to to not have a 1967 01:06:35,000 --> 01:06:41,760 higher sheets and more concrete backfill 1968 01:06:38,440 --> 01:06:45,680 and any any fill you put along the wall 1969 01:06:41,760 --> 01:06:47,520 um requires a mitigation from the 1970 01:06:45,680 --> 01:06:49,920 jurisdiction. So, the wall where 1971 01:06:47,520 --> 01:06:52,960 existing sheet piling 1972 01:06:49,920 --> 01:06:55,560 is the new sheet piling. It's It's 1973 01:06:52,960 --> 01:06:57,600 approximately a foot lower. 1974 01:06:55,560 --> 01:07:00,480 You're cutting it off. 1975 01:06:57,600 --> 01:07:02,680 You're cutting off longer pieces anyway. 1976 01:07:00,480 --> 01:07:04,960 Maybe. I mean, it depends where they 1977 01:07:02,680 --> 01:07:06,600 where they drive it to. Well, 1978 01:07:04,960 --> 01:07:09,040 I could drive it in and drive it in 1979 01:07:06,600 --> 01:07:10,520 those. These aren't being driven. 1980 01:07:09,040 --> 01:07:13,080 These aren't being driven. Yeah, they're 1981 01:07:10,520 --> 01:07:15,240 being pressed. There's no driving. 1982 01:07:13,080 --> 01:07:17,800 There there will be a It's that We did 1983 01:07:15,240 --> 01:07:19,400 We did We did design it so there's a 1984 01:07:17,800 --> 01:07:21,160 It's a It's a It'll be a gradual 1985 01:07:19,400 --> 01:07:22,840 transition, so it's not going to be a an 1986 01:07:21,160 --> 01:07:25,240 abrupt, you know, 1987 01:07:22,840 --> 01:07:27,000 90° change. It's There is going to be a 1988 01:07:25,240 --> 01:07:28,840 transition 1989 01:07:27,000 --> 01:07:29,680 over over a period of a horizontal 1990 01:07:28,840 --> 01:07:31,440 distance, so 1991 01:07:29,680 --> 01:07:33,359 » And and the 2019 1992 01:07:31,440 --> 01:07:35,720 repair has one as well. There's a a 1993 01:07:33,359 --> 01:07:37,120 little slope down to two different 1994 01:07:35,720 --> 01:07:38,920 elevations. 1995 01:07:37,120 --> 01:07:41,920 Um but to add 1996 01:07:38,920 --> 01:07:43,800 Julian to the reason for keep reasons to 1997 01:07:41,920 --> 01:07:45,000 keep it keep it down, one is the 1998 01:07:43,800 --> 01:07:47,880 permitting 1999 01:07:45,000 --> 01:07:49,520 because permitting agencies um 2000 01:07:47,880 --> 01:07:52,120 were 2001 01:07:49,520 --> 01:07:54,359 happy to see that if that's the the all 2002 01:07:52,120 --> 01:07:55,720 the pile would be kept below the the 2003 01:07:54,359 --> 01:07:58,600 height of 2004 01:07:55,720 --> 01:08:00,760 where the sea sea lettuce reaches 2005 01:07:58,600 --> 01:08:02,080 because that would be colonized much 2006 01:08:00,760 --> 01:08:03,760 more quickly by sea lettuce and 2007 01:08:02,080 --> 01:08:05,359 barnacles and so on. So, the lower the 2008 01:08:03,760 --> 01:08:07,120 better for them 2009 01:08:05,359 --> 01:08:10,840 as far as habitat goes. 2010 01:08:07,120 --> 01:08:13,080 Um then also aesthetics. Um right now 2011 01:08:10,840 --> 01:08:15,040 from from the the homes along there or 2012 01:08:13,080 --> 01:08:16,000 from from the water 2013 01:08:15,040 --> 01:08:17,880 um 2014 01:08:16,000 --> 01:08:19,600 it's it's less visible 2015 01:08:17,880 --> 01:08:21,000 the the lower down it is. 2016 01:08:19,600 --> 01:08:23,880 Um so, 2017 01:08:21,000 --> 01:08:25,600 that along with the embedding the 2018 01:08:23,880 --> 01:08:27,839 uh the gravel into the top of the 2019 01:08:25,600 --> 01:08:29,680 concrete along there um 2020 01:08:27,839 --> 01:08:31,680 you know, sort of the the permitting and 2021 01:08:29,680 --> 01:08:33,719 and somewhat for aesthetics. So, we're 2022 01:08:31,680 --> 01:08:36,600 talking about a foot. 2023 01:08:33,719 --> 01:08:38,200 About a foot, yes. Yeah. Yeah. 2024 01:08:36,600 --> 01:08:40,520 Yeah, so I mean, and if you look at the 2025 01:08:38,200 --> 01:08:42,880 the 2019 piles, there's a point on the 2026 01:08:40,520 --> 01:08:45,000 piles where the barnacles stop. And then 2027 01:08:42,880 --> 01:08:47,359 above that is just the the metal, you 2028 01:08:45,000 --> 01:08:49,480 know. So, the idea here was that 2029 01:08:47,359 --> 01:08:51,000 the this would be completely below that 2030 01:08:49,480 --> 01:08:54,160 that level of 2031 01:08:51,000 --> 01:08:55,839 you know, habitat. Is Is there Is there 2032 01:08:54,160 --> 01:08:57,560 inherently a 2033 01:08:55,839 --> 01:08:59,680 you know, for the people viewing it from 2034 01:08:57,560 --> 01:09:01,280 the water side or from the 2035 01:08:59,680 --> 01:09:01,920 homes out there? Obviously, 2036 01:09:01,280 --> 01:09:03,160 um 2037 01:09:01,920 --> 01:09:05,359 I mean, there is every every aesthetic 2038 01:09:03,160 --> 01:09:07,880 appeal to having it consistent as as 2039 01:09:05,359 --> 01:09:09,640 much as consistent as as possible. Um 2040 01:09:07,880 --> 01:09:11,719 but you're saying there's there's 2041 01:09:09,640 --> 01:09:14,040 there's no structural need for it cuz 2042 01:09:11,719 --> 01:09:16,200 that the note we got today clearly said 2043 01:09:14,040 --> 01:09:17,560 that the the the structural requirements 2044 01:09:16,200 --> 01:09:19,560 are really down below as opposed to 2045 01:09:17,560 --> 01:09:21,719 above. No structural need for it. My my 2046 01:09:19,560 --> 01:09:23,000 biggest concern is is it would add 2047 01:09:21,719 --> 01:09:25,000 additional mitigation measures and 2048 01:09:23,000 --> 01:09:27,640 potentially hold up the BCDC permitting 2049 01:09:25,000 --> 01:09:29,040 process. Um you guys need to sort of 2050 01:09:27,640 --> 01:09:30,759 give us a thumbs up and thumbs down 2051 01:09:29,040 --> 01:09:33,040 this. I mean I see Larry's point that it 2052 01:09:30,759 --> 01:09:35,759 might look better if it was less It was 2053 01:09:33,040 --> 01:09:38,160 all the same. jig jaggy. 2054 01:09:35,759 --> 01:09:40,000 But not enough to delay or or the 2055 01:09:38,160 --> 01:09:42,319 project or to have a cost consideration 2056 01:09:40,000 --> 01:09:43,640 or have 2057 01:09:42,319 --> 01:09:45,640 you know, permitting issues with you 2058 01:09:43,640 --> 01:09:47,480 know, the lead agency there. Right. 2059 01:09:45,640 --> 01:09:48,920 Yeah. Or even if we can do it from an 2060 01:09:47,480 --> 01:09:51,240 environmental perspective whether 2061 01:09:48,920 --> 01:09:53,319 whether ours are are 2062 01:09:51,240 --> 01:09:55,320 review covered that scope. But then 2063 01:09:53,319 --> 01:09:56,760 again, we did we're we're we're we're 2064 01:09:55,320 --> 01:09:58,680 we're we're 2065 01:09:56,760 --> 01:10:00,360 we're we're I'm leaning on the broader 2066 01:09:58,680 --> 01:10:01,520 review, right? So that matter that 2067 01:10:00,360 --> 01:10:03,080 should matter. The environmental review 2068 01:10:01,520 --> 01:10:05,880 should matter, right? 2069 01:10:03,080 --> 01:10:09,200 No, so that it wouldn't I don't think 2070 01:10:05,880 --> 01:10:11,560 impact the EIR if it was you know, if if 2071 01:10:09,200 --> 01:10:14,320 what you're talking about is is the 2019 2072 01:10:11,560 --> 01:10:17,120 sheet piles cuz I think that's 2073 01:10:14,320 --> 01:10:20,160 probably what was kind of envisioned as 2074 01:10:17,120 --> 01:10:21,880 the sort of a comparable Yeah, exactly. 2075 01:10:20,160 --> 01:10:24,560 Yeah, I don't know if Julian if you have 2076 01:10:21,880 --> 01:10:26,160 any thoughts on that. Well, it would 2077 01:10:24,560 --> 01:10:28,320 require going back to all the agencies. 2078 01:10:26,160 --> 01:10:29,840 It would be it would be more fill in the 2079 01:10:28,320 --> 01:10:32,440 jurisdictional waters. So we'd have to 2080 01:10:29,840 --> 01:10:34,200 restart or you know, renegotiate with 2081 01:10:32,440 --> 01:10:36,000 all the agencies and there would be a 2082 01:10:34,200 --> 01:10:38,200 cost increase. 2083 01:10:36,000 --> 01:10:38,200 Yeah. 2084 01:10:38,640 --> 01:10:41,480 Any answer? 2085 01:10:39,320 --> 01:10:44,520 » If I could chime in here too, from from 2086 01:10:41,480 --> 01:10:45,960 what we've talked about on this project 2087 01:10:44,520 --> 01:10:47,520 from the beginning we we always 2088 01:10:45,960 --> 01:10:49,440 envisioned I think this aesthetic 2089 01:10:47,520 --> 01:10:51,400 improvement that we're talking about 2090 01:10:49,440 --> 01:10:53,880 whether that be a cap or riprap or some 2091 01:10:51,400 --> 01:10:55,560 other kind of concealment method 2092 01:10:53,880 --> 01:10:57,640 for hiding that you know, the steel 2093 01:10:55,560 --> 01:11:00,240 sheet piles and the concrete. That would 2094 01:10:57,640 --> 01:11:01,960 always be coming as kind of a phase two. 2095 01:11:00,240 --> 01:11:03,600 And it's just a matter of when we can 2096 01:11:01,960 --> 01:11:05,640 get that done in terms of you know, 2097 01:11:03,600 --> 01:11:08,000 perhaps the larger project or when funds 2098 01:11:05,640 --> 01:11:09,040 are available. But you know, the 2099 01:11:08,000 --> 01:11:11,880 structural [clears throat] component 2100 01:11:09,040 --> 01:11:13,600 holding up the wall and you know, 2101 01:11:11,880 --> 01:11:15,600 keeping the cost down low was always our 2102 01:11:13,600 --> 01:11:17,920 primary target at least in the short 2103 01:11:15,600 --> 01:11:17,920 term. 2104 01:11:17,960 --> 01:11:22,480 Okay, I'll tell Larry. Thank you. 2105 01:11:21,080 --> 01:11:23,600 Yeah, he raised it last month also. And 2106 01:11:22,480 --> 01:11:25,200 I think 2107 01:11:23,600 --> 01:11:27,800 Yeah. You should I don't know if Larry 2108 01:11:25,200 --> 01:11:30,200 got that note you sent around today. Um 2109 01:11:27,800 --> 01:11:31,960 Um I I think he uh 2110 01:11:30,200 --> 01:11:33,520 with with the response from the state 2111 01:11:31,960 --> 01:11:35,840 and I think he must have because I think 2112 01:11:33,520 --> 01:11:37,920 that's what what you might be referring 2113 01:11:35,840 --> 01:11:40,040 to then for the 2114 01:11:37,920 --> 01:11:41,760 as far as the the misunderstanding. I 2115 01:11:40,040 --> 01:11:42,720 think that's maybe what what he was 2116 01:11:41,760 --> 01:11:45,280 referring He brought it up last week too 2117 01:11:42,720 --> 01:11:48,400 last month too. So he he may or may not 2118 01:11:45,280 --> 01:11:49,800 have it well. 2119 01:11:48,400 --> 01:11:51,360 » Right. Yeah, and I I mean I I 2120 01:11:49,800 --> 01:11:53,120 misunderstood it too actually cuz I 2121 01:11:51,360 --> 01:11:54,640 thought he was talking about having a 2122 01:11:53,120 --> 01:11:55,760 higher up 2123 01:11:54,640 --> 01:11:57,520 you know, 2124 01:11:55,760 --> 01:11:59,320 to support the wall. I think he just 2125 01:11:57,520 --> 01:12:01,080 wanted it to match what was there. Yeah, 2126 01:11:59,320 --> 01:12:03,120 I understand. And yes. 2127 01:12:01,080 --> 01:12:04,800 And so 2128 01:12:03,120 --> 01:12:06,640 Okay, I think we can adjourn unless 2129 01:12:04,800 --> 01:12:09,040 there's any further comments. Thank you 2130 01:12:06,640 --> 01:12:11,240 so much. So many thanks. Thanks. Yeah, 2131 01:12:09,040 --> 01:12:11,800 thank you all. Thank you all so much. 2132 01:12:11,240 --> 01:12:14,080 Thanks Robert. 2133 01:12:11,800 --> 01:12:14,080 » Thanks Robert. 2134 01:12:16,440 --> 01:12:18,640 What