1 00:02:33,040 --> 00:02:38,960 All right, we'll go ahead and start the Board of Commissioners meeting for Tuesday, March 3, 2 00:02:39,200 --> 00:02:45,420 2026. Start with the introductions. I'm Pat Malone, Commissioner. 3 00:02:46,280 --> 00:02:48,480 Nancy Wise, Commissioner. Gabe Shepherd, Commissioner. 4 00:02:48,860 --> 00:02:51,780 Vance Crony, County Council. Rick Krueger, Assistant County Administrator. 5 00:02:53,340 --> 00:02:58,900 And join us online. Ryan Jocelyn, District Attorney. 6 00:02:58,900 --> 00:02:59,620 Well, 7 00:03:04,420 --> 00:03:14,160 the sheriff was at our meeting this morning and probably just getting back to the office. So, I assume we'll see him shortly. 8 00:03:15,360 --> 00:03:18,980 Next up review and approve the agenda. 9 00:03:21,060 --> 00:03:31,300 There will be a change in the order 9.1 and 9.2 will 10 00:03:38,020 --> 00:03:42,480 be heard right after the consent calendar. 11 00:03:43,160 --> 00:03:53,520 And the idea is to get all the board meeting business finished before our public hearing at 11. 12 00:03:53,520 --> 00:03:58,900 And then, Rick, you had something to add under other. 13 00:03:59,940 --> 00:04:00,660 Yeah, thank you, Chair. 14 00:04:01,600 --> 00:04:10,980 I would like to add a request for letter of support for our congressional delegations into spending. 15 00:04:10,980 --> 00:04:19,000 It's a duplicate of the one that you are approving today, but it's going to be for representative Hoyle. 16 00:04:19,000 --> 00:04:24,100 So just wanted to make sure Congresswoman Hoyle, excuse me, that's it. 17 00:04:24,420 --> 00:04:24,940 Okay. 18 00:04:25,100 --> 00:04:33,620 And we will take care of that under other, all right, any other changes to the agenda? 19 00:04:36,040 --> 00:04:39,720 If not, I will consider the agenda approved. 20 00:04:40,180 --> 00:04:42,500 Are there any announcements this morning? 21 00:04:45,280 --> 00:04:56,760 Hearing none, we will start off with our proclamation, proclaiming March 2026 as Women's History Month 22 00:04:56,760 --> 00:05:01,920 in Benton County, Lacy Mollell, Director of our Hill Centers. 23 00:05:02,800 --> 00:05:03,500 Good morning. 24 00:05:03,980 --> 00:05:04,560 Good morning. 25 00:05:05,060 --> 00:05:10,720 I'm really happy to be here on behalf of women leaders at Benton County and all of 26 00:05:10,720 --> 00:05:17,480 our staff who are either in in management or leadership roles just simply by being public 27 00:05:17,480 --> 00:05:24,320 servants so whereas throughout history women have played an integral role in shaping societies 28 00:05:24,320 --> 00:05:31,040 fostering innovation and advocating for progress across all sectors including education science 29 00:05:31,040 --> 00:05:37,240 the arts government and business women history women's history month is a time to honor 30 00:05:37,240 --> 00:05:43,700 remarkable achievements of women past and present who have overcome obstacles, broken barriers, 31 00:05:44,300 --> 00:05:49,880 and paved the way for future generations, and provides an opportunity to honor the countless 32 00:05:49,880 --> 00:05:56,440 contributions women have made to the social, economic, cultural, and political fabric of our 33 00:05:56,440 --> 00:06:03,340 community and our nation. Throughout history, women have demonstrated resilience, leadership, 34 00:06:03,340 --> 00:06:10,340 innovation, and courage while advocating for equality, expanding opportunities, and strengthening 35 00:06:10,340 --> 00:06:11,720 families and communities. 36 00:06:12,400 --> 00:06:20,500 The National Women's History Alliance has designated the 2026 theme as leading the change, Women 37 00:06:20,500 --> 00:06:22,280 Shaping a Sustainable Future. 38 00:06:22,900 --> 00:06:27,840 This theme celebrates the pivotal role that women play in addressing today's urgent 39 00:06:27,840 --> 00:06:35,700 challenges including environmental, economic, educational, and societal while forging equitable 40 00:06:35,700 --> 00:06:41,700 resilience and justice-driven communities for tomorrow. From climate change innovators to 41 00:06:41,700 --> 00:06:47,880 economic justice reformers, from education equity advocates to civil engagement pioneers, 42 00:06:48,640 --> 00:06:54,240 women are reimagining systems and creating sustainable blueprints that prioritize both 43 00:06:54,240 --> 00:07:00,400 people and the planet. These inspiring leaders, particularly those from marginalized communities, 44 00:07:00,800 --> 00:07:06,360 demonstrate that sustainable progress is achieved through intersectional efforts that 45 00:07:06,360 --> 00:07:11,860 span environmental stewardship, financial inclusion, social justice, mentorship, 46 00:07:12,320 --> 00:07:17,960 and intergenerational collaboration. And recognizing Women's History Month 47 00:07:17,960 --> 00:07:25,020 month encourages reflection on past progress, awareness of ongoing challenges, and commitment 48 00:07:25,020 --> 00:07:26,960 to advancing equity for all. 49 00:07:27,520 --> 00:07:35,280 Bitten County government is dedicated to fostering an inclusive community where the accomplishments 50 00:07:35,280 --> 00:07:39,140 and potential of women and girls are celebrated and supported. 51 00:07:40,160 --> 00:07:45,340 Now therefore, the Bitten County Board of Commissioners does hereby proclaim March 52 00:07:45,340 --> 00:07:52,080 March 2026 as Women's History Month in Benton County, Oregon, and encourages all community 53 00:07:52,080 --> 00:07:58,260 members to celebrate, support, and uplift the women in our community by fostering opportunities 54 00:07:58,260 --> 00:08:01,280 for education, empowerment, and collaboration. 55 00:08:04,730 --> 00:08:08,430 Are there any comments or ... 56 00:08:09,770 --> 00:08:11,250 Well, I think we should clap more. 57 00:08:12,570 --> 00:08:13,090 Okay. 58 00:08:14,330 --> 00:08:24,010 Well, I will move to proclaim March 2026 as women's history month in Benton County proclamation P2026-003. 59 00:08:24,190 --> 00:08:24,430 Second. 60 00:08:25,410 --> 00:08:27,050 All in favor of the motion say aye. 61 00:08:27,270 --> 00:08:27,450 Aye. 62 00:08:27,810 --> 00:08:27,950 Aye. 63 00:08:29,170 --> 00:08:37,650 Just a comment I think it's very appropriate to have Lacey Mollell or clinic director 64 00:08:37,650 --> 00:08:43,450 director as reading the proclamation. So thank you. 65 00:08:49,340 --> 00:08:51,300 All right, next up are there 66 00:08:51,300 --> 00:08:53,400 any comments from the public? 67 00:08:57,720 --> 00:09:00,980 Okay, none in the room. Are there any signed up 68 00:09:00,980 --> 00:09:03,200 online? Okay, 69 00:09:21,700 --> 00:09:31,280 and are the comments other than dealing with the landfill? Okay, 70 00:09:35,280 --> 00:09:36,580 go 71 00:09:36,580 --> 00:09:43,440 ahead online and identify yourself please. Yes, Andy Bennett. 72 00:09:46,130 --> 00:09:47,890 Okay, go ahead. Do you 73 00:09:47,890 --> 00:09:55,030 have up to three minutes for a public comment? Okay, thank you. So I'm wanting 74 00:09:55,030 --> 00:10:02,030 to comment and revisit the speed issues out here in North Albany on Scenic Drive, 75 00:10:02,530 --> 00:10:07,210 which have been addressed for at least the last four or five years, I'm 76 00:10:07,210 --> 00:10:13,370 sure. And this last summer, we had a fatality out here in an accident and then shortly thereafter 77 00:10:13,370 --> 00:10:19,510 we had another accident on the corner of Valley View and Scenic. And with the number of new 78 00:10:19,510 --> 00:10:23,990 homes going to be built out here, we really need to get the speed limit down to 35. 79 00:10:24,490 --> 00:10:31,190 I've mentioned many, many times that the methodology and process that ODOT has been 80 00:10:31,190 --> 00:10:37,650 using in Benton County to determine speed limits is not reality. I have not 81 00:10:37,650 --> 00:10:43,350 found one person who's been involved in this speed assessment process who has 82 00:10:43,350 --> 00:10:52,150 actually driven our road and starting at 30 miles an hour going to 35, 40, 45, 50, 83 00:10:52,290 --> 00:11:00,110 55, 60 and so on because that would really let a person know that the in 84 00:11:00,110 --> 00:11:05,790 In the state of Oregon, the basic rule is the rule, and the basic rule for scenic drive 85 00:11:05,790 --> 00:11:07,490 is not 45 miles an hour. 86 00:11:07,870 --> 00:11:09,350 At the most, it would be 35. 87 00:11:10,470 --> 00:11:16,910 And so until the people who are determining these speed limits through the testing and 88 00:11:16,910 --> 00:11:21,370 methodology they use start using the basic rule by getting out there and actually driving 89 00:11:21,370 --> 00:11:25,510 these roads at those speeds, we're going to keep having more accidents and deaths. 90 00:11:27,150 --> 00:11:29,830 And yeah, here again, I'm going to say 35. 91 00:11:30,110 --> 00:11:35,470 We need to get it set there, especially with the new building going to go on out on Powers Road out here, 92 00:11:35,490 --> 00:11:37,730 which would accommodate up to 500 people. 93 00:11:38,670 --> 00:11:42,690 We should probably be putting a stop sign at the corner of Scenic Drive and Powers. 94 00:11:42,990 --> 00:11:45,990 That would really slow people down with all the extra traffic, 95 00:11:46,350 --> 00:11:49,750 which includes the thousands of new homes being built out here. 96 00:11:50,550 --> 00:11:58,310 So, I'm probably put a stop sign on the corner of Oak Grove and powers as well so people can 97 00:11:58,310 --> 00:12:05,610 just not go speeding however they want out in this North Albany area and that's my and 98 00:12:05,610 --> 00:12:10,750 I do also want to say I did not appreciate Pat when you called me up and harassed and 99 00:12:10,750 --> 00:12:17,270 bullied me on the phone back about a year and a half ago and so that has been reported. 100 00:12:17,270 --> 00:12:18,830 it. I just wanted to let you know. 101 00:12:21,630 --> 00:12:28,730 All right, thank you. We have the sheriff with 102 00:12:28,730 --> 00:12:37,270 us. Do you have any comments on that North Albany and Scenic? Yeah, I want to 103 00:12:37,270 --> 00:12:40,230 thank Andy first of all. Thank you for bringing this to light. I might drive 104 00:12:40,230 --> 00:12:46,010 that stretch road a few times every day and that 25th and Scenic when you come 105 00:12:46,010 --> 00:12:51,710 down off the scenic there towards 25th. That can be pretty hairy as well. And so I would 106 00:12:51,710 --> 00:12:55,290 agree with Andy if we could somehow take a look at this. That would be awesome. Thank 107 00:12:55,290 --> 00:12:55,450 you. 108 00:12:56,030 --> 00:12:59,930 Sheriff, do you think you might be willing to reach out to Senator Gelser, Bluwin and 109 00:12:59,930 --> 00:13:05,610 Representative Bosshart Davis and bring this to their attention since they can talk 110 00:13:05,610 --> 00:13:06,050 to ODOT? 111 00:13:06,710 --> 00:13:09,590 Certainly. If that's what you would need me to do, I have no problems doing that. 112 00:13:09,590 --> 00:13:17,450 And it might help if Andy did the same just from a grassroots level, not just the law enforcement side. 113 00:13:18,230 --> 00:13:25,150 Yeah, I have reached out to Representative Davis. So, yeah. 114 00:13:25,370 --> 00:13:30,990 Thank you, Andy. I think it could be, you know, additionally meaningful if our sheriff were to do so as well. 115 00:13:31,430 --> 00:13:33,870 Yeah, I would appreciate it. Thank you so much. 116 00:13:34,450 --> 00:13:36,330 We're only going to make it safer out here. 117 00:13:38,270 --> 00:13:41,690 Andy, this is Commissioner Shepard. I wanted to also add that I've been speaking with a 118 00:13:41,690 --> 00:13:48,930 few folks in that little development on 25th, 26th, you know, that little pocket, specifically 119 00:13:48,930 --> 00:13:53,890 about that intersection that the sheriff just mentioned on 25th and Scenic. And we have 120 00:13:53,890 --> 00:14:01,870 scheduled that intersection and the curve before it for a speed study. We don't have 121 00:14:01,870 --> 00:14:06,910 a date yet, but it is now in the list for a Benton County Sponsored Speed Study so 122 00:14:06,910 --> 00:14:14,190 that we can have some hard data to talk about and to show that there might be, that there's 123 00:14:14,190 --> 00:14:14,610 a need there. 124 00:14:14,990 --> 00:14:16,550 So I just wanted to let you know. 125 00:14:16,990 --> 00:14:21,870 Well, thank you, and I would like to say, when you get to the top of the hill before 126 00:14:21,870 --> 00:14:25,450 you start going down, you don't even need to put your foot on the gas, and you're 127 00:14:25,450 --> 00:14:28,990 going over 45 miles an hour when you get to the bottom when you're coming 128 00:14:28,990 --> 00:14:35,910 40 to 25th so it's that's just one of the areas and with all the new building 129 00:14:35,910 --> 00:14:40,850 and the proposed building on Andy I'm sorry you your three minutes are up I'm 130 00:14:40,850 --> 00:14:48,780 sorry thank you noted your concern though thank you thank you all right 131 00:14:48,780 --> 00:14:57,080 next up we'll start our work session 6.1 Corvall spent county economic 132 00:14:57,080 --> 00:14:59,640 Development Office Quarterly update. 133 00:15:00,000 --> 00:15:06,840 Christopher Jacobs, economic development manager, and Lily Bender. 134 00:15:10,380 --> 00:15:10,840 Good morning. 135 00:15:12,520 --> 00:15:13,180 Good morning. 136 00:15:17,460 --> 00:15:23,900 Great to be with you all again. How do I get this started? 137 00:15:29,500 --> 00:15:35,440 Yeah, I'm just going to start sliding. All right, awesome. We're going to mix things up a little 138 00:15:35,440 --> 00:15:49,600 Today, usually I go through the strategic plan updates. Those are in your packet. So if you want to read more in depth about our progress, you can take a look at that, but we're going to kind of walk through a PowerPoint. 139 00:15:49,960 --> 00:15:55,100 And I think it might be quicker and allow for more questions and just touch on really the pertinent stuff. 140 00:15:56,500 --> 00:15:56,760 Right. 141 00:15:58,660 --> 00:16:07,760 This is always kind of a fun time of year to look back at the last progress that you've made over the last calendar year, kind of set a roadmap for the current calendar year. 142 00:16:09,060 --> 00:16:19,300 So we're going to touch on downtown Corvallis. We're going to touch on industrial lands and kind of paint a broad picture of what we've done and what we're going to do moving forward. 143 00:16:19,900 --> 00:16:23,980 Starting out with downtown Corvallis, there's a lot of momentum right now around the downtown 144 00:16:23,980 --> 00:16:28,660 strategic vitality task force and the recommendations that have come out of that. 145 00:16:28,860 --> 00:16:32,940 And so if you haven't taken the survey, I would encourage you to go ahead and do so. 146 00:16:34,560 --> 00:16:39,440 There's some interesting action items, and I think that that planning effort could 147 00:16:39,440 --> 00:16:43,160 lay the foundation for kind of a downtown master plan for Corvallis. 148 00:16:43,160 --> 00:16:53,400 And it also, along with several other things, has kind of initiated council to begin a TIF feasibility study. 149 00:16:54,180 --> 00:17:04,160 So that is underway. We see property ownership changes driving a lot of activity in downtown Corvallis, property consolidation, 150 00:17:04,920 --> 00:17:07,760 new reinvestment folks retiring and selling properties. 151 00:17:08,700 --> 00:17:14,840 We see parking challenges and policy changes on the horizon as we've got white papers that are completed. 152 00:17:15,440 --> 00:17:18,940 They recommend certain policy changes and new technology upgrades. 153 00:17:20,160 --> 00:17:23,260 We see code changes really reshaping development patterns. 154 00:17:23,720 --> 00:17:34,220 So, allowing for greater density, greater height, and removing parking requirements has created the conditions for investment and scale in our downtown like we've never seen before. 155 00:17:35,480 --> 00:17:47,480 market rate and mixed use development patterns are also emerging as we have new incentives like the multi-unit property tax exemption program, which have allowed the Gordon hotel and residences to go under construction. 156 00:17:47,480 --> 00:17:56,700 And we have a second Mukti application for a 13-story, 263-unit mixed-use project at 4th and Western. 157 00:17:57,140 --> 00:18:01,760 So just under two weeks, City Council will hear that second Mukti request. 158 00:18:02,200 --> 00:18:04,320 It's $132 million project. 159 00:18:04,540 --> 00:18:05,180 Did that get delayed? 160 00:18:06,100 --> 00:18:08,020 It was supposed to be heard last night, wasn't it? 161 00:18:08,140 --> 00:18:09,380 It did get delayed. 162 00:18:10,080 --> 00:18:16,240 There was a little hiccup in the public hearing process back in February 2023. 163 00:18:16,240 --> 00:18:22,860 Oh, before either of us were here. When the MAPTI ordinance was adopted by City Council, 164 00:18:23,200 --> 00:18:28,040 it never included a public hearing process. So we held that public hearing last night 165 00:18:28,040 --> 00:18:34,980 and we re-adopted the ordinance. Okay. We're going to be hearing the second MAPTI application. 166 00:18:35,320 --> 00:18:42,480 So that was the cause of the delay. We do see emergent leadership from our Main Street organization 167 00:18:42,480 --> 00:18:46,760 as they've recently received new designation from the Oregon Main Street Association. 168 00:18:48,260 --> 00:18:56,380 And they're doing really great things, beginning the holiday parade again, and the tree lighting, 169 00:18:56,720 --> 00:19:00,940 taking that over, holding wine walk events and other really interesting stuff. 170 00:19:01,300 --> 00:19:06,480 Friday lights, if you haven't been, this great event helped organize by the DCO. 171 00:19:08,620 --> 00:19:12,640 We do see, unfortunately, elevated vacancy rates relative to the rest of the community 172 00:19:12,640 --> 00:19:16,240 in downtown Corvallis, about 11% compared to 3.5%. 173 00:19:17,220 --> 00:19:20,000 I think a lot of this is due to the property consolidation 174 00:19:20,000 --> 00:19:23,360 that's underway, however, as some properties remain vacant 175 00:19:23,650 --> 00:19:26,640 that are under contract and there are plans to redevelop, 176 00:19:27,160 --> 00:19:29,960 but those haven't quite unfolded yet. 177 00:19:31,140 --> 00:19:33,780 We see power constraints from deferred maintenance 178 00:19:33,780 --> 00:19:35,380 and the high cost of public infrastructure 179 00:19:35,380 --> 00:19:39,000 being a major barrier, and that potentially being 180 00:19:39,670 --> 00:19:41,460 one use of tax increment financing 181 00:19:41,460 --> 00:19:43,580 to address some of those public utility challenges. 182 00:19:44,760 --> 00:19:46,520 And then a tourism economy and transition. 183 00:19:47,100 --> 00:19:48,840 So with the dissolution of the PAC-12, 184 00:19:49,240 --> 00:19:51,300 the VisitCorp Alice organization is going 185 00:19:51,300 --> 00:19:53,660 through an experience development plan 186 00:19:53,660 --> 00:19:57,820 to help reimagine what drives tourism in our community, 187 00:19:58,480 --> 00:20:00,920 given that some of the traffic that we could have expected 188 00:20:00,920 --> 00:20:03,420 from the former PAC-12 alignment, 189 00:20:04,880 --> 00:20:07,360 we can't really count on that long-term the way 190 00:20:07,360 --> 00:20:08,100 that we have in the past. 191 00:20:11,030 --> 00:20:13,310 So you mentioned MAPTI is a transformational tool 192 00:20:13,310 --> 00:20:19,170 for downtown Corvallis, mentioned tax increment financing. There's the Main Street Revitalization 193 00:20:19,170 --> 00:20:26,410 Grant Project for the plaza. It's 425 Southwest Madison Ave. That's the $325,000 grant that 194 00:20:26,410 --> 00:20:30,970 was awarded. And that project we just submitted for the final reimbursement. So if you haven't 195 00:20:30,970 --> 00:20:37,610 checked that out, it's where coffee culture is and ever bull. And so there are a couple 196 00:20:37,610 --> 00:20:40,190 new restaurants in there as well. It's a very neat space. 197 00:20:43,190 --> 00:20:46,050 So, industrial development. We have 198 00:20:46,050 --> 00:20:53,170 37 vacant industrial sites total in Benton County, five industrial buildings, 32 vacant industrial, 199 00:20:53,690 --> 00:21:00,550 mostly greenfield spaces, 960 acres of vacant industrial lands available for sale or lease. 200 00:21:01,550 --> 00:21:06,570 Majority of those lands are in South Corvallis, 65 percent of them, while 25 percent are in 201 00:21:07,310 --> 00:21:11,490 And so when we talk about industrial development, this is where we're really spending the bulk 202 00:21:11,490 --> 00:21:14,710 of our time because these are where industrial lands are located. 203 00:21:16,570 --> 00:21:22,570 Four major barriers to developing, our capacity, and deferred maintenance. 204 00:21:23,110 --> 00:21:28,610 Right now, anything over one megawatt requires a load study that can take anywhere from six 205 00:21:28,610 --> 00:21:31,890 weeks to six months, add a lot of cost to the project. 206 00:21:32,870 --> 00:21:35,870 transportation and system plan amendments in South Corvallis. 207 00:21:36,030 --> 00:21:37,550 So there's a bunch of collector roads. 208 00:21:38,290 --> 00:21:40,730 Every 625 feet of a collector road is $2 million. 209 00:21:41,850 --> 00:21:47,750 And so this adds dramatic costs when you have really lines on a map 210 00:21:47,750 --> 00:21:52,350 that we're imagining a certain development pattern that may no longer be accurate. 211 00:21:53,090 --> 00:21:57,290 So we've got to look at that transportation system plan and see if some of these collector roads, 212 00:21:57,290 --> 00:22:02,850 roads, especially the north-south ones are really what we intended them to be. I understand 213 00:22:02,850 --> 00:22:07,770 trying to pull traffic off of Highway 99, however the north-south collector roads don't 214 00:22:07,770 --> 00:22:16,610 really do that effectively. As far as access to Highway 99 east-west roads makes a lot 215 00:22:16,610 --> 00:22:17,410 more sense to me. 216 00:22:18,550 --> 00:22:24,430 Wetland delineation studies and permitting, so state wetland inventory map is, I would 217 00:22:24,430 --> 00:22:31,470 pretty out of date. It was based on records collected decades ago. And newer wetland delineation 218 00:22:31,470 --> 00:22:38,870 studies reveal vastly smaller wetland areas than are imagined on the map or that were 219 00:22:38,870 --> 00:22:46,610 measured at one point long ago. And there's been changes with regard to how the federal 220 00:22:46,610 --> 00:22:51,150 government regulates wetlands. The U.S. Army Corps of Engineers following the Sackett 221 00:22:51,150 --> 00:22:57,250 case really doesn't regulate the types of wetlands that we see in South Corvallis, 222 00:22:57,430 --> 00:23:01,190 ones with no clear connection to a body of water above ground. 223 00:23:02,010 --> 00:23:08,310 So right now, we're just working through state DEQ and state DSL on the wetland permitting. 224 00:23:09,230 --> 00:23:14,350 And so there are some encouraging things coming out of the governor's office. 225 00:23:14,350 --> 00:23:22,050 4084 is a fast track bill that includes potentially expedited wetland permitting, so that could 226 00:23:22,050 --> 00:23:22,590 help a lot. 227 00:23:23,270 --> 00:23:24,630 And then industrial code amendments. 228 00:23:25,190 --> 00:23:30,250 So this has been a long time goal of our office is to update the industrial zoning code 229 00:23:30,250 --> 00:23:32,330 in South Corvallis based on best practices. 230 00:23:33,050 --> 00:23:38,670 Following the annexation of South Corvallis Airport Industrial Park, this is something 231 00:23:38,670 --> 00:23:39,550 we're going to be undertaking. 232 00:23:39,550 --> 00:23:44,370 So that annexation application was submitted a couple weeks ago. 233 00:23:45,130 --> 00:23:53,590 There's also the regionally significant industrial sites application that has been submitted as of last week. 234 00:23:54,170 --> 00:23:57,690 So that allows for reimbursement of public infrastructure costs. 235 00:23:57,990 --> 00:24:03,490 Say if the city wanted to participate in putting in one of these roads that may be necessary to serve a development site. 236 00:24:03,490 --> 00:24:13,870 We could be reimbursed the cost of that road over a period of time from state income taxes paid by the development project if they meet the performance requirements of the program. 237 00:24:18,660 --> 00:24:28,060 We continue to respond to a lot of site selection inquiries from the state, and we've delineated 60 acres of the airport industrial park. 238 00:24:28,060 --> 00:24:35,380 So we've got some target sites in our airport industrial park, in particular that we're heavily marketing. 239 00:24:37,970 --> 00:24:41,430 So what have we done over the last 18 months? It's kind of fun to look back on. 240 00:24:42,290 --> 00:24:48,350 I like to call this kind of the foundational stuff. None of it is really going to blow you away, 241 00:24:48,450 --> 00:24:55,270 but it's stuff that's really, really important to kind of build on in order to accomplish the goals that we've set out. 242 00:24:55,270 --> 00:25:07,070 So modernizing a business retention and expansion program that assists more than 200 businesses annually, creating a business registry, adopting new tools like commercial property-assessed clean energy. 243 00:25:07,470 --> 00:25:08,950 Thank you, Board of Commissioners. 244 00:25:10,150 --> 00:25:16,630 Starting our downtown revolving loan fund program again and participating in the Main Street program again have been big wins. 245 00:25:18,070 --> 00:25:22,570 Documenting site conditions and updating prospector records to help with site selection inquiries. 246 00:25:23,690 --> 00:25:26,210 This is one that may not excite a lot of people. 247 00:25:26,730 --> 00:25:27,850 It's really exciting to us. 248 00:25:28,070 --> 00:25:32,750 It's really difficult to compete for these types of investments if you don't know what you have, 249 00:25:33,210 --> 00:25:40,650 and you are not accurately describing the sewer, the water, the electrical capacity, 250 00:25:40,930 --> 00:25:43,870 the gas capacity on these sites. 251 00:25:44,210 --> 00:25:45,250 And we arrived. 252 00:25:46,350 --> 00:25:49,110 We didn't have a great handle of what our industrial lands were. 253 00:25:49,530 --> 00:25:51,550 We hadn't documented the site conditions. 254 00:25:51,550 --> 00:25:57,850 And so now we're able to really respond competitively with the sites that we do have available. 255 00:25:59,910 --> 00:26:01,870 We've updated mobile food unit regulations. 256 00:26:02,350 --> 00:26:09,810 And so touching a little bit on Southcore Vallis Food Hub grant program, we have just 257 00:26:09,810 --> 00:26:17,310 under $100,000 left to distribute, four out of five of the projects are complete. 258 00:26:17,310 --> 00:26:21,670 And the only one left that's not complete is the food cart pod. 259 00:26:22,370 --> 00:26:30,190 And so there's been a lot of discussion about citing food truck pods in South Corvallis. 260 00:26:30,650 --> 00:26:32,670 First, we kind of started at the New Holland Building. 261 00:26:33,890 --> 00:26:39,730 They have longer term goals there in terms of commercial footprint of that space, 262 00:26:39,730 --> 00:26:45,650 a budding Highway 99, and then they've since moved to another location that 263 00:26:45,650 --> 00:26:51,430 they're considering, and then two more have actually emerged. So it's been this 264 00:26:51,430 --> 00:26:56,790 sort of enough knocking on doors. You've got a lot of folks in South 265 00:26:56,790 --> 00:27:02,510 Courthouse now talking about starting a food truck pod and looking into what 266 00:27:02,510 --> 00:27:07,610 available resources there are through the Urban Renewal Agency. And so, you 267 00:27:07,610 --> 00:27:12,070 you know, we're trying to really spread our eggs 268 00:27:12,070 --> 00:27:15,090 in lots of different baskets because you don't know 269 00:27:15,090 --> 00:27:16,850 which one of these is going to come to fruition 270 00:27:16,850 --> 00:27:20,190 and there's a great potential for one or more 271 00:27:20,190 --> 00:27:21,790 in Southcore ballots to take root. 272 00:27:24,920 --> 00:27:27,540 We have the airport annexation, 273 00:27:28,040 --> 00:27:30,040 this has been underway like I mentioned 274 00:27:30,040 --> 00:27:32,180 and then the EV gaps analysis. 275 00:27:32,720 --> 00:27:35,880 So I shared that with the BOC at one point as well. 276 00:27:35,880 --> 00:27:45,980 So, what's our roadmap for 2026. What we've completed the regionally significant industrial sites application we're going to hear back and see if we're accepted to that program. 277 00:27:46,420 --> 00:27:49,080 Got to go through the public hearing process for annexation. 278 00:27:50,780 --> 00:27:56,760 We are no longer participating in the EDA grant for industrial site readiness that we're working with a partner that is. 279 00:27:58,460 --> 00:28:03,000 We're working through the downtown TIF district implementation schedule, like I mentioned, 280 00:28:03,200 --> 00:28:09,240 the industrial code changes, the second Mufti application, closing out the food hubs, and 281 00:28:09,240 --> 00:28:12,900 then dealing with some contamination from the Willamette Valley Sportsman Association 282 00:28:14,700 --> 00:28:16,120 in our airport industrial park. 283 00:28:16,400 --> 00:28:21,180 So this has been a long time problem that we're going to deal with finally this year. 284 00:28:22,560 --> 00:28:23,200 All right. 285 00:28:24,880 --> 00:28:25,880 That wraps it up. 286 00:28:25,880 --> 00:28:27,120 Any questions? 287 00:28:30,320 --> 00:28:35,280 I want to go back to the, what was it? 288 00:28:35,580 --> 00:28:37,000 The constraints. 289 00:28:37,640 --> 00:28:38,360 Potential barriers. 290 00:28:39,540 --> 00:28:41,520 Power capacity is one of them. 291 00:28:41,920 --> 00:28:44,180 So OSU is building a new supercomputer. 292 00:28:46,220 --> 00:28:49,620 And I don't know how much of a load that's going to put on our system. 293 00:28:50,180 --> 00:28:52,640 And you're talking here about power capacity. 294 00:28:52,820 --> 00:28:57,260 Are we thinking about downtown and how old the wiring is for all that kind of stuff? 295 00:28:57,260 --> 00:29:01,140 How far are we talking about literal load capacity coming into the city of Corvallis? 296 00:29:02,720 --> 00:29:07,480 Certain areas, depending on the proximity of substations and service lines, are better 297 00:29:07,480 --> 00:29:08,160 equipped than others. 298 00:29:09,240 --> 00:29:12,740 Downtown is one of those where there's this process of looping. 299 00:29:14,960 --> 00:29:20,420 And so the OB project added millions of dollars of cost, added a lot of time to 300 00:29:20,420 --> 00:29:26,280 the project, stuff that they didn't anticipate when they started the project, and stuff 301 00:29:26,280 --> 00:29:28,880 But that's not common in every community, right? 302 00:29:29,660 --> 00:29:36,180 Certain service areas, in particular consumers, power service areas, just are better equipped. 303 00:29:36,520 --> 00:29:41,500 They don't have so much deferred maintenance, such a long timeline for adding capacity. 304 00:29:42,700 --> 00:29:46,680 South Corvallis in particular doesn't have an adequate substation, they've been trying 305 00:29:46,680 --> 00:29:52,660 to site one now for a while, we've just had a meeting with them and we're encouraging 306 00:29:52,660 --> 00:29:58,320 them to site it in the airport industrial park, meaning with who? Pacific power. Pacific power. Okay. 307 00:30:00,530 --> 00:30:06,630 So, as far as those view, I don't know what the conditions are for them to scale for the capacity that's needed. 308 00:30:07,010 --> 00:30:12,650 I imagine the folks that are working on that project have engaged specific power, but I don't know the details of that. 309 00:30:12,850 --> 00:30:20,970 So it's not, it's likely not the same struggles that you're facing right now for the economic development in downtown and south town. 310 00:30:21,150 --> 00:30:21,790 It's likely not. 311 00:30:22,050 --> 00:30:23,010 Okay, thank you. 312 00:30:25,890 --> 00:30:36,930 You mentioned the industrial code amendments. Is that city or county or oath? 313 00:30:37,690 --> 00:30:46,870 Yeah, it's going to be city. So we've got a following annexation. You've got this nifty airport overlay and we don't have such a thing. 314 00:30:46,870 --> 00:30:55,970 So we've got to fix our code to accommodate the FAA regulations in our general industrial 315 00:30:55,970 --> 00:30:56,450 area. 316 00:30:57,130 --> 00:31:02,830 And then there's just some things that don't make a lot of sense about our industrial code, 317 00:31:02,910 --> 00:31:03,730 the way that it is. 318 00:31:04,370 --> 00:31:09,710 One of the use types is limited manufacturing that kind of imagines like an artisanal 319 00:31:10,190 --> 00:31:15,310 sort of 20 employees or less using hand tools to make different things. 320 00:31:15,310 --> 00:31:21,950 And it doesn't really hit on the sort of target industries that we talk about that are innovation 321 00:31:21,950 --> 00:31:26,630 or traded sector companies are looking to flourish in our community. 322 00:31:28,150 --> 00:31:30,530 And so there's some work that needs to happen there. 323 00:31:30,810 --> 00:31:35,990 Luckily, the industrial code changes haven't prevented necessarily folks from developing 324 00:31:35,990 --> 00:31:36,990 in our community. 325 00:31:37,610 --> 00:31:42,770 We've got other barriers that have prevented folks, primarily the high cost of public 326 00:31:42,770 --> 00:31:48,930 infrastructure or wetlands. So we don't even get to the industrial code part that 327 00:31:48,930 --> 00:31:54,730 really shuts the door. There are barriers ahead of that we've we're trying to 328 00:31:54,730 --> 00:31:58,110 address before we worry about the industrial code. 329 00:32:00,740 --> 00:32:02,640 All right you mentioned 330 00:32:02,640 --> 00:32:11,400 the airport and I think I ask this every time what kind of progress has been 331 00:32:11,400 --> 00:32:19,420 been made getting the county out of the picture as far as the airport industrial area. 332 00:32:20,180 --> 00:32:25,840 So as far as the airport industrial area, citing the substation from Pacific would 333 00:32:25,840 --> 00:32:32,460 be a huge win. It would get transmission lines down there that might otherwise add a lot 334 00:32:32,460 --> 00:32:37,720 of cost to a development project. We've got land available so we could really be 335 00:32:37,720 --> 00:32:42,000 competitive in terms of limiting the site acquisition costs for a substation. 336 00:32:43,640 --> 00:32:50,240 The annexation of the airport industrial park is a huge, huge lift now that we've got that 337 00:32:50,240 --> 00:32:54,520 application in, and we're going to go through a public hearing process over the next 60 338 00:32:54,520 --> 00:32:54,880 days. 339 00:32:56,060 --> 00:33:03,820 And then I would highlight the RISIS program as being another huge milestone without having 340 00:33:03,820 --> 00:33:11,280 a way to participate in the development project from a financial perspective, we're kind of 341 00:33:11,280 --> 00:33:17,260 at a competitive disadvantage. With the limited financial resources of Corvallis, you know, 342 00:33:17,320 --> 00:33:22,560 folks don't want to put millions of dollars into public infrastructure prospectively 343 00:33:22,560 --> 00:33:29,840 for a development project, but folks might be willing to do something if they were 344 00:33:29,840 --> 00:33:33,140 going to be reimbursed for the cost of the public infrastructure. 345 00:33:33,940 --> 00:33:39,060 So that's another tool that we've never had that could really be attractive when we're 346 00:33:39,060 --> 00:33:45,320 recording potential development projects or two that I know could have made the difference 347 00:33:45,320 --> 00:33:46,840 on my time here. 348 00:33:48,300 --> 00:33:48,980 Okay. 349 00:33:49,620 --> 00:33:57,060 And you mentioned, I think it was specifically the electrical power infrastructure for the 350 00:33:57,060 --> 00:34:11,420 Gordon Hotel and is it downtown's old and has gotten by with what power was 351 00:34:12,320 --> 00:34:18,460 available and now we have I mean the hotel was the maybe the tipping point 352 00:34:18,460 --> 00:34:25,420 and because I noticed a lot of large holes in the ground for look like 353 00:34:25,420 --> 00:34:35,320 electrical vaults in the surrounding area so the developer did not know ahead 354 00:34:35,320 --> 00:34:41,960 of time that this was gonna be part of part of the building. I don't think they 355 00:34:41,960 --> 00:34:46,500 anticipated just how much added cost would come from the Pacific Power side 356 00:34:46,500 --> 00:34:51,580 of things based on their experience in other communities. I would say that 357 00:34:51,580 --> 00:34:55,020 that there was more of a burden on the developer 358 00:34:55,500 --> 00:34:58,340 undertaking that project from a utility perspective, 359 00:35:00,300 --> 00:35:02,080 specifically Pacific Power. 360 00:35:03,540 --> 00:35:04,720 I can give you another anecdote. 361 00:35:05,260 --> 00:35:07,740 We have the Plaza 425 Southwest Madison, 362 00:35:08,040 --> 00:35:10,800 originally anticipated doing solar on the roof, 363 00:35:11,460 --> 00:35:13,780 couldn't because of issues with Pacific Power. 364 00:35:17,380 --> 00:35:20,380 We're kind of in an odd place. 365 00:35:21,580 --> 00:35:24,860 in terms of our service area requirements for transformers. 366 00:35:26,380 --> 00:35:31,700 OBE had to identify like a 10 by 10 square foot space 367 00:35:32,340 --> 00:35:33,380 on their property. 368 00:35:34,420 --> 00:35:37,360 Actually, they had to contract with another adjacent property 369 00:35:37,360 --> 00:35:38,460 to get this space 370 00:35:38,460 --> 00:35:39,840 because they had already designed their footprint 371 00:35:39,840 --> 00:35:42,460 of their building to have clear sky view 372 00:35:42,880 --> 00:35:43,700 for the transformer. 373 00:35:44,680 --> 00:35:46,660 Now in other parts of the state, 374 00:35:46,900 --> 00:35:49,520 you can wheel these transformers 375 00:35:49,520 --> 00:35:58,720 in and out of the building. And so this is just like one of the added difficulties with 376 00:35:58,720 --> 00:36:05,480 policy that they've encountered on the Pacific Power side. So there's lots of different anecdotes 377 00:36:05,480 --> 00:36:07,380 like this that we've heard about. 378 00:36:07,580 --> 00:36:13,760 And the Gordon Hotel folks are paying most or all of these upgrades? 379 00:36:14,840 --> 00:36:19,980 oh yeah yeah I mean the city hasn't hasn't put forth money to upgrade the 380 00:36:19,980 --> 00:36:26,980 utilities to accommodate that development project or Pacific power or it's all on 381 00:36:26,980 --> 00:36:32,620 the hotel yeah yes when a development project comes through this costs are 382 00:36:32,620 --> 00:36:38,090 passed on to the developer right any other questions 383 00:36:43,400 --> 00:36:45,500 well I was just gonna 384 00:36:45,500 --> 00:36:56,560 say this is timely, the Governor's Prosperity Council, as I think you may have mentioned. 385 00:37:00,680 --> 00:37:09,120 It's nice that the governor recognizes that economic development, we can't just sit back and 386 00:37:11,460 --> 00:37:17,320 it will come to us. We've got to be more active and you folks have 387 00:37:18,760 --> 00:37:29,820 important role in that, but it's nice to get the recognition from the governor's level that this is an issue that needs some attention. 388 00:37:30,460 --> 00:37:43,180 So hopefully we can get some help from the state level or at least guidance or something will come out of the governor's effort. 389 00:37:43,180 --> 00:37:50,500 So thank you for your report and for your efforts. 390 00:37:53,280 --> 00:37:53,980 Thank you. 391 00:37:58,580 --> 00:37:59,160 All right. 392 00:37:59,620 --> 00:38:08,420 Next up, 25-27 financial status update through February 15, 2026. 393 00:38:09,120 --> 00:38:12,360 And for for Santa Anais, our CFO. 394 00:38:13,580 --> 00:38:14,400 Good morning. 395 00:38:21,860 --> 00:38:22,240 Thank you. 396 00:38:22,240 --> 00:38:34,630 Good morning, chair, board of commissioners and members of staff for county financial policy, a semi annual financial update is to be presented to the board. 397 00:38:34,850 --> 00:38:44,110 So I am here before you this morning to present the financial status update on the 2025 27 biennial budget. 398 00:38:44,110 --> 00:38:49,110 it as of February 15th, 2026. 399 00:38:50,410 --> 00:38:55,570 So at this point in time, we are over halfway through our first year in the biennium. 400 00:38:56,190 --> 00:39:02,890 And I just wanted to share that the county is stable and expenditures are tracking below 401 00:39:02,890 --> 00:39:03,450 benchmarks. 402 00:39:04,950 --> 00:39:09,330 So the format of the report should be very familiar to you. 403 00:39:10,250 --> 00:39:12,850 It should be what you're used to in the past. 404 00:39:12,850 --> 00:39:18,850 We'll first review a counterwide overview of expenditures by categories. 405 00:39:19,750 --> 00:39:25,550 We will dig a little bit deeper by department and look at revenues and expenditures. 406 00:39:26,330 --> 00:39:31,470 And then we'll take a look at the status of capital improvement projects and then give 407 00:39:31,470 --> 00:39:35,310 you some insight in terms of what's to come next time we meet. 408 00:39:38,490 --> 00:39:43,230 Here is the countywide expenditure budget by category. 409 00:39:44,170 --> 00:39:53,890 And you can see here the breakdown of the 540,274,492 that the Board has approved. 410 00:39:54,790 --> 00:39:59,970 The largest category is in the area of personal services, 411 00:40:00,370 --> 00:40:06,470 and you can see that in all of the areas, everything is below the threshold of 30% 412 00:40:06,470 --> 00:40:08,510 where we ought to be at this period of time. 413 00:40:08,510 --> 00:40:15,270 We have quite a bit of vacancies in various areas of the organization, so that's helping 414 00:40:15,270 --> 00:40:18,770 to contribute below the benchmark levels. 415 00:40:19,590 --> 00:40:28,210 Also for capital outlay, it's a little less than projected levels because we have some 416 00:40:29,710 --> 00:40:35,150 capital improvement projects with little to no expenditures to report to date. 417 00:40:36,270 --> 00:40:40,190 That service and transfers are where they ought to be at this time. 418 00:40:41,750 --> 00:40:50,790 So overall, with 23% of expenditures organization-wide, this is really good news because every major 419 00:40:50,790 --> 00:40:53,350 expenditure is below the threshold of 30%. 420 00:40:53,350 --> 00:40:59,710 And this puts us at a really good position to finish out the four and a half months 421 00:40:59,710 --> 00:41:07,910 that we have for our first biennium or first year of our biennium. This is just a graphical 422 00:41:07,910 --> 00:41:15,050 view of what we just covered. Some folks prefer to look at a chart versus data set, so it's 423 00:41:15,050 --> 00:41:19,170 just here for those that prefer visuals instead. 424 00:41:22,360 --> 00:41:24,420 Okay, we're digging a little bit deeper now 425 00:41:24,420 --> 00:41:30,800 into a more granular view of both the county's revenues and expenditures. This is presented to 426 00:41:30,800 --> 00:41:36,920 by department. So here you'll see what the resources and expenditures, approved 427 00:41:36,920 --> 00:41:42,200 expenditures that each department is working with and where they stand today 428 00:41:42,200 --> 00:41:48,600 against benchmarks for revenue collections and expended amounts year to 429 00:41:48,600 --> 00:41:54,460 date. So because the largest expenditure in most of our departments is by way of 430 00:41:54,460 --> 00:42:02,320 salaries and benefits. I am using the benchmark of 30% as a guide. And so you'll see here 431 00:42:02,320 --> 00:42:06,820 there are some areas on the expenditure side of this table that are highlighted in yellow. 432 00:42:07,840 --> 00:42:15,980 What this means is that, you know, the expenditure levels are slightly higher than our threshold 433 00:42:15,980 --> 00:42:23,360 of 30 percent. So these are being put on the watch list. And essentially financial departments, 434 00:42:24,040 --> 00:42:30,380 sorry, financial services is working with each of the departments and just making sure that 435 00:42:30,380 --> 00:42:36,480 they are aware of what's causing these anomalies. And then we are working closely with them for 436 00:42:36,480 --> 00:42:45,260 a corrective action should that be necessary. So, for ease of visualization on the revenue 437 00:42:45,980 --> 00:42:53,080 side of things, we are slightly using a different benchmark. We're taking into consideration 438 00:42:53,900 --> 00:43:00,320 historical trends of the revenues as they come. A large portion of our revenues is 439 00:43:00,320 --> 00:43:06,160 from property tax, and that is primarily collected in November of each year. 440 00:43:06,380 --> 00:43:08,140 So we do take that into consideration. 441 00:43:08,680 --> 00:43:12,900 You do see some yellow highlights here on the revenue side of things. 442 00:43:13,840 --> 00:43:18,300 And this is because, let's see here, 443 00:43:20,670 --> 00:43:24,710 in the area of fleets specifically for public 444 00:43:24,710 --> 00:43:31,270 works, the revenue from feeable sales are below projected levels and also capital outlay 445 00:43:31,270 --> 00:43:34,390 for vehicle replacement to date is already at 90%. 446 00:43:34,390 --> 00:43:36,410 So nothing to be concerned about. 447 00:43:36,630 --> 00:43:40,610 They are working with a large restricted balance 448 00:43:40,610 --> 00:43:42,590 for these capital outlay replacement. 449 00:43:43,390 --> 00:43:45,590 And so I just have it here as a watch 450 00:43:45,590 --> 00:43:48,250 because their expenditures are pretty high today. 451 00:43:49,370 --> 00:43:53,550 Another area on this watch list is the IT department 452 00:43:53,550 --> 00:43:56,410 with the professional services related 453 00:43:56,410 --> 00:43:59,870 to network related cost being higher than normal. 454 00:44:01,270 --> 00:44:08,350 And then the non-departmental area, we are working closely with the state for the cost 455 00:44:08,350 --> 00:44:10,370 share for the new courthouse project. 456 00:44:13,620 --> 00:44:19,040 And this is an area that I do want to have a conversation about because the county collects 457 00:44:19,040 --> 00:44:25,420 revenue that doesn't necessarily belong to any one particular area in the organization 458 00:44:25,420 --> 00:44:30,760 but serves multiple functions or areas within the county. 459 00:44:30,760 --> 00:44:39,460 So, we account for these revenues in a bucket called non-departmental and so here you can 460 00:44:39,460 --> 00:44:44,620 see a little bit of the revenues that flow through this division or cost centers. 461 00:44:45,620 --> 00:44:54,160 The major portion of the discretionary revenue for the general fund is property taxes and 462 00:44:54,160 --> 00:44:59,960 and about 78% is part of the 64 million that we are. 463 00:45:01,300 --> 00:45:11,080 And coupled with other revenue sources the county has, like the local option levy, which 464 00:45:11,080 --> 00:45:18,980 funds our mental health programs, law enforcement services and emergency services. These are 465 00:45:18,980 --> 00:45:27,060 all accounted for in the non-departmental revenue bucket. So this section just seeks 466 00:45:27,060 --> 00:45:34,060 to provide transparency into the shared revenue streams that the county receives as a whole. 467 00:45:37,400 --> 00:45:43,740 This is a graphical view of our capital improvement projects. The board has approved 468 00:45:44,260 --> 00:45:49,540 a million dollars in this biennium for funding capital improvement projects. 469 00:45:50,920 --> 00:45:57,200 And this is a listing of all of the funded projects for the biennium. You can see here 470 00:45:57,200 --> 00:46:05,360 at the bottom total that it's a lot more than a million dollars. I do have a footnote here 471 00:46:05,360 --> 00:46:13,580 that's that about 596,000 of those are carry forward projects from the last biennium. And 472 00:46:14,300 --> 00:46:20,480 you'll see those identified with an asterisk. So one of them being the courthouse roof paint for 473 00:46:20,480 --> 00:46:32,720 $200,000, the Chiller for about $385,000, and then the online platform tool which I think 474 00:46:32,720 --> 00:46:40,860 was presented to you last meeting for the Permits Applications Licenses Navigation Tool. 475 00:46:41,600 --> 00:46:48,240 So you can see here the remainder of the projects have been approved for the biennium. 476 00:46:48,240 --> 00:46:54,180 Some have already started with incurred costs that you see and many of them 477 00:46:54,180 --> 00:46:56,480 have yet to be scheduled for work. 478 00:47:01,920 --> 00:47:04,280 And a major project and investment for the 479 00:47:04,280 --> 00:47:09,540 county of course is the district attorney office and the courthouse. The 480 00:47:09,540 --> 00:47:16,800 total project amounts to just over 86 million dollars including reserves and so 481 00:47:16,800 --> 00:47:27,420 you can see here we've spent about 40.9 million and so the focus last month has been exterior 482 00:47:27,420 --> 00:47:35,640 weatherproofing, window insulation and applying the roofing systems. So this is the most recent 483 00:47:36,510 --> 00:47:44,080 photo image of the project today and I too am looking very forward to getting a tour 484 00:47:46,120 --> 00:47:50,380 on this later this month or early in April. 485 00:47:55,120 --> 00:47:59,280 So as you know, the county works closely with a number of service districts. 486 00:47:59,800 --> 00:48:02,860 And here's the status of each of the service districts today. 487 00:48:03,920 --> 00:48:12,280 Public works provides oversight on the operations of the service districts, primarily those 488 00:48:12,280 --> 00:48:17,300 that provide water and sewer to the community members. 489 00:48:17,300 --> 00:48:24,700 And they include Alpine, Cascade View, Hidden Valley, South Third, and LC. 490 00:48:26,500 --> 00:48:34,120 You will see that there's a couple of service districts with no expenditures next to them. 491 00:48:34,860 --> 00:48:40,780 The 9-1-1 Emergency Communications and the Library Service District have very little 492 00:48:40,780 --> 00:48:41,960 expenditures to date. 493 00:48:42,160 --> 00:48:45,260 I forgot to put a footnote down at the bottom of this slide. 494 00:48:45,260 --> 00:48:52,900 it's merely a timing issue. Last week we did provide disbursements of property tax collected 495 00:48:53,530 --> 00:49:02,560 for these districts 4.3 million went to emergency services and 3.7 million went to the library 496 00:49:02,560 --> 00:49:10,080 district so making the expenditures to date equivalent to the 49% collected in revenues. 497 00:49:10,080 --> 00:49:11,260 And 498 00:49:13,660 --> 00:49:21,820 then, some budget considerations to think about as we move forward into our biennial 499 00:49:21,820 --> 00:49:22,180 budget. 500 00:49:22,520 --> 00:49:27,780 There is a market study in the works as we speak for AFSCME. 501 00:49:28,780 --> 00:49:36,140 Staff will be conducting a full RFP process, and it is the hope that we will be able 502 00:49:36,140 --> 00:49:43,520 to bring forward the analysis and the updates of the study to the board sometime in May 503 00:49:43,520 --> 00:49:49,780 or June and with a possibility of a July 1 implementation date. 504 00:49:52,060 --> 00:49:58,720 So in the area of recruitment and retention, some of our higher level and tech roles have 505 00:49:58,720 --> 00:50:06,480 proven to be difficult to fill. We've had to go back out for repeated 506 00:50:06,480 --> 00:50:14,360 recruitment and so that's just been a challenge and I know our partners at HR 507 00:50:14,360 --> 00:50:23,320 are working very hard with departments to get those vacancies filled. My 508 00:50:23,320 --> 00:50:27,480 department along with the analyst team are working diligently with their 509 00:50:27,480 --> 00:50:32,720 assigned departments to ensure that staff are understanding their spending authority 510 00:50:32,720 --> 00:50:40,060 levels and are working towards their vacancy factor requirements for the biennium. 511 00:50:41,820 --> 00:50:50,400 And then of course with the expiring PERS bond, the finance and core leadership have 512 00:50:50,400 --> 00:50:55,140 been working very closely and keeping an eye out on the overall cost that this might 513 00:50:55,140 --> 00:51:07,260 have in our next biennial budget period as 44% of the paid benefit cost is related to 514 00:51:07,260 --> 00:51:08,080 hers. 515 00:51:10,720 --> 00:51:15,740 So this is pretty much all that I have for you today. Next time we meet, I am hopeful 516 00:51:15,740 --> 00:51:24,040 that the fiscal year 24-25 audit will be completed so that we can talk more about 517 00:51:24,040 --> 00:51:32,120 where we're at with our fund balances. Staff is also working on a supplemental budget to bring 518 00:51:32,120 --> 00:51:39,460 forward to you next month, likely for your consideration and approval, and it will likely be 519 00:51:39,460 --> 00:51:48,500 more than 10%. So in summary, the county expenditures overall are tracking appropriately. 520 00:51:49,280 --> 00:51:55,760 Revenue collections are aligned, the capital projects you see are progressing, and there 521 00:51:55,760 --> 00:51:59,820 are only a few areas that are on the watch list today. 522 00:52:00,520 --> 00:52:06,760 So at this point, the county does remain stable and operating within its means. 523 00:52:07,780 --> 00:52:11,600 So happy to answer questions that you might have. 524 00:52:13,020 --> 00:52:16,200 I wanted to start by thanking you for your presentation today. 525 00:52:16,200 --> 00:52:23,000 but also, you know, we're talking about the state of our finances, and I wanted to kind 526 00:52:23,000 --> 00:52:27,880 of update my colleagues here about work that I've been doing with Jennifer related to CSC. 527 00:52:28,440 --> 00:52:32,820 So as you are aware, at our last Community Services Consortium meeting, Jennifer was 528 00:52:32,820 --> 00:52:40,500 able to make it and listen to the financial concerns of that organization, and she and 529 00:52:40,500 --> 00:52:46,240 I had a conversation afterwards. And she's going to reach out to the CFOs from Lincoln 530 00:52:46,240 --> 00:52:54,380 and Lynn to have a conversation a little bit outside the CSC realm about between the three 531 00:52:54,380 --> 00:53:00,940 counties from a financial side. What is CSC really need right now? What do we see as 532 00:53:00,940 --> 00:53:07,100 counties that we can do to help? Or where are the real issues? Where are the issues 533 00:53:07,100 --> 00:53:11,920 right now. So I just wanted to highlight that and say thank you and also offer this because 534 00:53:11,920 --> 00:53:17,600 you're sitting here as an opportunity for folks to ask questions about that specific 535 00:53:19,120 --> 00:53:21,160 potential impact on our budget as well. 536 00:53:26,250 --> 00:53:34,210 Yeah, I was at that meeting and I think probably the 537 00:53:35,470 --> 00:53:43,010 My takeaway was we need two or three options of how to proceed. 538 00:53:45,420 --> 00:53:59,930 It's taken a while to delve into the CSE budget and turning over a lot of rocks to find mostly 539 00:53:59,930 --> 00:54:12,310 the negative things about their budget, and they've been identified, and as far as the 540 00:54:12,310 --> 00:54:24,410 day-to-day operations have gone from a negative to a modest positive, but there's years worth 541 00:54:24,410 --> 00:54:34,670 of basically deficit spending that needs to be, now that it's been recognized, needs to 542 00:54:34,670 --> 00:54:35,190 be addressed. 543 00:54:37,430 --> 00:54:43,850 I can't quite say I look forward to the discussion, but it's a needed, 544 00:54:46,130 --> 00:54:49,130 hopefully at least the 545 00:54:49,130 --> 00:54:57,030 the big pieces have been identified, and now we actually know what the actual situation is 546 00:54:57,030 --> 00:55:10,360 and time to do something about it. And I think it's, that was a good discussion at the last meeting, 547 00:55:10,360 --> 00:55:15,080 and it keeps getting clearer what the actual situation is. So, 548 00:55:17,000 --> 00:55:28,610 And basically, the counties are ultimately responsible to be continued. 549 00:55:28,970 --> 00:55:39,290 But back to our CFO's report this morning, you started out saying we are below benchmarks. 550 00:55:39,790 --> 00:55:43,770 And in financial terms, that's a good thing, is that correct? 551 00:55:44,370 --> 00:55:45,270 That's a good thing. 552 00:55:47,350 --> 00:55:54,730 either revenues are a little higher than rejected or it sounds like from the report 553 00:55:54,730 --> 00:56:06,670 the expenses are slightly under what we had budgeted to this point yes so through 554 00:56:06,670 --> 00:56:11,690 this point we should be at or below that 30% so overall county spending is at 555 00:56:11,690 --> 00:56:18,270 23. So that's a really good position. Just means that the county overall is operating 556 00:56:18,270 --> 00:56:23,890 within its appropriations. The departments are managing their spending responsibly, 557 00:56:25,190 --> 00:56:26,990 which has taken us to this point. 558 00:56:27,570 --> 00:56:31,090 Okay. What was the figure that we're actually at? 559 00:56:31,350 --> 00:56:32,070 23%. 560 00:56:32,070 --> 00:56:33,390 23. Okay. 561 00:56:35,870 --> 00:56:43,630 And I'm on the CIP committee, so I've been involved in some of these projects. 562 00:56:43,830 --> 00:56:52,750 You mentioned a couple of projects that had up to over 500,000 that were carried over 563 00:56:52,750 --> 00:57:04,510 from the last budget cycle, did the dollars also transfer into this budget? 564 00:57:04,990 --> 00:57:11,530 That will be part of the supplemental that will be coming forward to you in April. 565 00:57:12,050 --> 00:57:19,730 And that explains the difference between the million dollars allocated for CIP and the 566 00:57:19,730 --> 00:57:30,130 almost 5.6 million that's on the on the budget side. I 567 00:57:33,010 --> 00:57:38,930 saw reserves I'm not sure 568 00:57:38,930 --> 00:57:49,790 what paid in the $10 million range and I know to make the budget work that was 569 00:57:49,790 --> 00:58:03,410 trim from our 12 million that we would like to be at and make the overall budget 570 00:58:03,410 --> 00:58:07,870 work that was trimmed down to approximately 10 million. Yes that was 571 00:58:07,870 --> 00:58:13,110 part of balancing the current biennium budget that we have along with other 572 00:58:13,110 --> 00:58:17,230 measures such as the vacancy factor savings. 573 00:58:18,390 --> 00:58:27,850 Okay, so we are modestly under-reserved compared to previous years. 574 00:58:27,870 --> 00:58:28,190 Yes, yes. 575 00:58:29,170 --> 00:58:39,450 And that might be an area where we want to beef things up depending on how the budget performs. 576 00:58:40,790 --> 00:58:44,750 Definitely another conversation that we should have in the future as well. 577 00:58:49,910 --> 00:58:52,510 Jennifer, thank you for coming today and presenting to us. 578 00:58:52,590 --> 00:58:56,830 And thank you for presenting the information in such a clear and easy way to understand. 579 00:58:57,670 --> 00:58:59,910 I appreciate that. So thank you, you and your team. 580 00:59:00,850 --> 00:59:07,270 I wonder if it would be possible to get a more in-depth report on the PERS once. 581 00:59:07,470 --> 00:59:09,330 So I'm glad to hear that we have a team working on that. 582 00:59:09,330 --> 00:59:15,270 And once you all know more information, I would love to hear about it more in depth. 583 00:59:22,930 --> 00:59:26,170 Thank you, Commissioner Weiss, for bringing that up. 584 00:59:26,290 --> 00:59:28,710 And I was going to just make a quick comment. 585 00:59:28,930 --> 00:59:31,090 One, just a point of clarification. 586 00:59:31,770 --> 00:59:34,930 Jennifer talked about the CIP projects and the carryover. 587 00:59:35,090 --> 00:59:37,730 One of them was the online platform. 588 00:59:37,990 --> 00:59:39,150 I know it was a small amount. 589 00:59:39,770 --> 00:59:43,450 She mentioned relating to the permitting just so that we don't confuse the project. 590 00:59:43,450 --> 00:59:49,990 this one is actually related to the comprehensive plan update and I think what we can assure you is 591 00:59:49,990 --> 00:59:55,710 all that money has all been spent. I think it's just a matter of a coding. So I just wanted to 592 00:59:55,710 --> 00:59:59,170 make sure we clarified the projects. 593 01:00:00,000 --> 01:00:05,120 But in terms of what Commissioner Wise and I want to emphasize what Jennifer said, 594 01:00:05,880 --> 01:00:11,960 purse costs are something we really need to take seriously. I think you all know and heard from 595 01:00:11,960 --> 01:00:18,740 the last budget period how much we were seeing in terms of an increase. And that was before 596 01:00:19,760 --> 01:00:24,920 the site accounts, as we call them, which Jennifer mentioned, the purse bonds. So kind of the good 597 01:00:24,920 --> 01:00:25,760 Good news, bad news. 598 01:00:26,300 --> 01:00:30,580 Good news is next binding will start to see the payoff of those PERS bonds. 599 01:00:30,940 --> 01:00:34,080 So that's not a cost that we will continue to incur. 600 01:00:34,500 --> 01:00:40,660 Bad news is the payment of those bonds or those bonds keep our cost down on PERS. 601 01:00:40,980 --> 01:00:41,720 It's complicated. 602 01:00:42,240 --> 01:00:47,340 I mean, I will not kid you, it is a complicated matter in terms of how do you manage that. 603 01:00:47,500 --> 01:00:53,520 But it's a real issue for all of local government right now in terms of dealing 604 01:00:53,520 --> 01:01:02,520 with a growth in property tax but a modest small growth when you have excess of some 605 01:01:02,520 --> 01:01:04,140 of these increases in PERS, it's big. 606 01:01:04,320 --> 01:01:07,500 So thank you, Commissioner Wise, for bringing it up, and I do think this is something we 607 01:01:07,500 --> 01:01:08,980 all are going to have to get our heads around. 608 01:01:14,440 --> 01:01:25,390 On the PERS, the site account is another funding stream to the question. 609 01:01:25,390 --> 01:01:37,230 Is it accurate that that site account that we bought a number of years ago is another way we are funding our PERS obligation? 610 01:01:39,180 --> 01:01:41,540 It's helping us keep the rates down. 611 01:01:43,740 --> 01:01:52,620 But basically another, instead of just general fund, it's another funding stream. 612 01:01:53,260 --> 01:01:58,400 It's a funding source that the county is also paying for, so it's kind of a wash. 613 01:01:59,520 --> 01:02:07,300 Commissioner, you have kind of two sources aside to count. The first one is back in 2002 and 2004, we issued what is called Per's Bonds. 614 01:02:07,520 --> 01:02:12,800 And as Jennifer alluded to, we issued that to invest and pay down that rate. 615 01:02:13,360 --> 01:02:19,200 We've been paying that ever since in terms of the form of bonds and a debt service so that again is expense like 616 01:02:19,200 --> 01:02:25,700 Jennifer said that we're paying the other source of side account and I'm gonna get my date wrong. I believe I'm gonna just say 617 01:02:27,200 --> 01:02:33,020 Around 2018-2019 is we made a five million dollar from our reserves 618 01:02:33,580 --> 01:02:38,140 Investment to a side account to in to again same principle in this case 619 01:02:38,140 --> 01:02:44,620 It was actually just paying that end to purge and what it does is it buys down the rate that we pay 620 01:02:44,620 --> 01:02:50,940 So it kept those costs down now that one will continue to last I and Jennifer can correct me if I have this wrong 621 01:02:50,940 --> 01:02:54,940 But I think it's around 2035 that site again will expire 622 01:02:54,940 --> 01:03:00,520 But the purge bonds will again expire as Jennifer alluded to in 2029. I believe 623 01:03:01,780 --> 01:03:05,280 Thank you. Well, I appreciate the 624 01:03:05,280 --> 01:03:15,260 the update. And I think we can try to schedule these on a regular basis, maybe quarterly, 625 01:03:17,360 --> 01:03:24,700 because as you've pointed out, a lot of moving parts, and we want to make sure that the parts 626 01:03:24,700 --> 01:03:31,520 are, most of the parts are moving in the right direction, or if they're not trying to 627 01:03:31,520 --> 01:03:45,840 things relatively early and see what we can do to mitigate any negative consequences. Appreciate 628 01:03:45,840 --> 01:03:50,600 your efforts and your report this morning. Thank you. 629 01:03:56,420 --> 01:04:00,560 All right. Next up is our consent 630 01:04:00,560 --> 01:04:06,500 calendar. Do I hear a motion? Move to approve the consent calendar. 631 01:04:06,500 --> 01:04:15,800 Second. All in favor of the motion say aye. Aye. Motion carries and we will now move on to 632 01:04:16,600 --> 01:04:24,260 new business. Let's see if we have the right people here. 633 01:04:28,660 --> 01:04:36,440 Acceptance 9.1. Acceptance of a right away from Ryan and Stacy Cheek for public road and 634 01:04:36,440 --> 01:04:40,760 Utility Purposes and Dave Malone. 635 01:04:41,260 --> 01:04:41,820 Good morning. 636 01:04:42,480 --> 01:04:42,740 Good morning. 637 01:04:46,920 --> 01:04:47,320 All right. 638 01:04:47,580 --> 01:04:48,280 Try that again. 639 01:04:48,520 --> 01:04:48,880 Good morning. 640 01:04:49,660 --> 01:04:55,340 David Malone with Benton County Surveyor with Public Works and we are here for accepting 641 01:04:55,340 --> 01:04:57,280 a right-of-way dedication on Airport Avenue. 642 01:04:59,280 --> 01:05:06,620 The Cheek property has applied for a, I believe it's an accessory farm dwelling which created 643 01:05:06,620 --> 01:05:13,780 a nexus for road improvements, and engineering staff looked at this road and evaluated its 644 01:05:13,780 --> 01:05:17,000 current standard, its substandard according to transportation plan. 645 01:05:17,980 --> 01:05:24,040 It has a narrow right-of-way, they have a lot of frontage on this road, but it was 646 01:05:24,040 --> 01:05:30,140 decided that the best, the improvements that we could get instead of having them pay 647 01:05:30,140 --> 01:05:35,180 for a very small portion of improvements would be to get extra right-of-way along 648 01:05:35,180 --> 01:05:40,300 their entire frontage so that in the future we would have a better opportunity to create 649 01:05:40,300 --> 01:05:47,060 better safe improvements on that road. And so they agreed to that and I have the original 650 01:05:47,060 --> 01:05:53,180 sign notarized right-of-way dedication deed here and we just need the commission to evaluate 651 01:05:53,180 --> 01:05:54,720 that and decide if they want to accept that. 652 01:05:57,540 --> 01:05:59,900 All right. Are there any questions? 653 01:06:02,160 --> 01:06:04,320 If not, I will entertain a motion. 654 01:06:04,320 --> 01:06:09,140 All right. I move to accept the right-of-way dedication from Ryan Pier, Thomas Cheek and 655 01:06:09,140 --> 01:06:14,220 Stacey Marie Cheek for Public Road and Utility Purposes for Airport Avenue, County Road No. 656 01:06:15,400 --> 01:06:15,800 25280. 657 01:06:16,600 --> 01:06:16,920 Second. 658 01:06:17,800 --> 01:06:19,640 All in favor of the motion, say aye. 659 01:06:19,820 --> 01:06:20,060 Aye. 660 01:06:20,180 --> 01:06:20,360 Aye. 661 01:06:20,820 --> 01:06:21,600 Motion carries. 662 01:06:23,740 --> 01:06:26,920 And you need some signatures, is that right? 663 01:06:27,580 --> 01:06:30,840 And I can just leave this up at the desk so you can get to it this afternoon at 664 01:06:30,840 --> 01:06:31,300 your convenience. 665 01:06:31,300 --> 01:06:38,680 Here's the original document and once it's signed and the council has signed it we can I can pick it up for recording 666 01:06:39,220 --> 01:06:44,320 And all three commissioners need to sign that just the chair. Okay. Thank you 667 01:07:02,220 --> 01:07:02,860 All 668 01:07:05,710 --> 01:07:10,210 right, Jennifer we need to have you come back up. I 669 01:07:10,750 --> 01:07:13,110 Was trying to be so efficient here. I 670 01:07:13,870 --> 01:07:15,130 skipped over the 671 01:07:16,410 --> 01:07:18,310 Motion to accept your report 672 01:07:18,310 --> 01:07:19,170 I 673 01:07:22,600 --> 01:07:27,580 move to accept receipt of the semi-annual finance report for the period ending February 15, 674 01:07:27,760 --> 01:07:29,640 2026. Second. 675 01:07:30,300 --> 01:07:32,800 All in favor of the motion say aye. Aye. 676 01:07:33,420 --> 01:07:35,820 Motion carries. Thank you again. 677 01:07:42,350 --> 01:07:50,270 Item 9.2, approval of a letter in opposition to clear-cutting at Maryspeak and Alcy Falls. 678 01:07:50,970 --> 01:07:53,310 Is that you Commissioner Shepard? 679 01:07:53,310 --> 01:07:59,350 So I want to start by thanking staff, especially Sean McGuire and Jesse Ott, for putting this 680 01:07:59,350 --> 01:07:59,650 together. 681 01:08:00,910 --> 01:08:05,910 I approached staff last week after the federal government announced plans to clear-cut areas 682 01:08:05,910 --> 01:08:12,290 outside on near Elsie Falls and on Mary Speak, and I asked for a letter of opposition. 683 01:08:12,950 --> 01:08:14,810 And they did a lot of good research. 684 01:08:14,910 --> 01:08:18,930 They put something together for us, and I really appreciate it, and I read it, and 685 01:08:18,930 --> 01:08:24,510 reads really well and I think it is very soundly based on facts and science and I'm really 686 01:08:25,090 --> 01:08:32,410 personally frustrated that this we're talking about again the idea of clear cutting an important 687 01:08:32,410 --> 01:08:43,250 community and cultural resources in Benton County. There are some things that money can't buy 688 01:08:44,070 --> 01:08:46,330 and Old Growth Forest is one of them. 689 01:08:47,230 --> 01:08:51,270 So I just wanted to bring this before the board 690 01:08:51,270 --> 01:08:55,310 to see if we could all potentially join together 691 01:08:55,310 --> 01:08:56,790 in putting a letter of opposition 692 01:08:56,790 --> 01:08:59,110 and there's the public comment period is still open on it. 693 01:08:59,610 --> 01:09:02,550 I don't know how successful public comment will be 694 01:09:02,550 --> 01:09:04,570 with this administration and at this time, 695 01:09:04,870 --> 01:09:08,170 but I wanted to see if we could go on the record 696 01:09:09,630 --> 01:09:10,510 opposing this. 697 01:09:10,670 --> 01:09:12,790 So I just wanted to bring this forward 698 01:09:12,790 --> 01:09:14,710 and as timely a manner as I could. 699 01:09:18,300 --> 01:09:20,160 Well, I just wanted to thank Commissioner Shepard 700 01:09:20,160 --> 01:09:22,020 for heading this up. 701 01:09:22,180 --> 01:09:25,420 And I was in DC at the NACO conference 702 01:09:25,420 --> 01:09:26,580 when this all kind of blew up 703 01:09:26,580 --> 01:09:28,940 and definitely received lots of input 704 01:09:28,940 --> 01:09:31,540 and concern from constituents. 705 01:09:32,340 --> 01:09:36,980 So I very much appreciate and support this. 706 01:09:37,360 --> 01:09:39,060 And I'd be happy to make a motion, 707 01:09:39,220 --> 01:09:41,060 but if Commissioner Shepard would like to make it, okay. 708 01:09:41,540 --> 01:09:43,100 I moved to approve the letter of opposition 709 01:09:43,100 --> 01:09:44,700 to clear cutting at Mary's Peak 710 01:09:44,700 --> 01:09:48,600 and ALSI Falls and to direct staff to submit the letter to the Bureau of Land Management 711 01:09:48,600 --> 01:09:54,760 for the instructions for comment published in the Federal Register. Second. All in favor of the 712 01:09:54,760 --> 01:10:05,160 motion say aye. Aye. Motion carries. Question is there any follow-up that we should be 713 01:10:05,740 --> 01:10:13,020 trying to do besides the letter or after the letter goes in? I think it would be great to 714 01:10:13,020 --> 01:10:18,120 forward this letter also to our federal delegation. I don't think we need a motion to do that. 715 01:10:18,400 --> 01:10:26,320 But beyond that for follow-up, I'm not sure I would defer to Jesse on what he thinks would 716 01:10:26,320 --> 01:10:32,100 be effective at this point. I'm not – it's sad. I don't feel like it's going to be 717 01:10:32,100 --> 01:10:38,100 super effective. I would love to put more energy behind this, but I want to make 718 01:10:38,100 --> 01:10:43,220 sure that, and I appreciate your votes, that we took a stand on this. So I think forwarding 719 01:10:43,220 --> 01:10:44,940 it to our federal delegation would be a great start. 720 01:10:46,500 --> 01:10:50,600 And I think trying whatever we can is always worth it, even if, you know, at least we 721 01:10:50,600 --> 01:10:51,100 can say we tried. 722 01:10:53,220 --> 01:11:03,780 Well, and I assume this affects other areas in Oregon and maybe monitor who else is 723 01:11:03,780 --> 01:11:12,800 involved in this effort to see what kind of coalition we can put together and 724 01:11:13,680 --> 01:11:22,100 especially with our looping in our congressional delegation. Yeah I'm not as 725 01:11:22,100 --> 01:11:25,380 familiar with how this will affect other counties but I think that's 726 01:11:25,380 --> 01:11:29,160 something we can look into and we can call our colleagues and see how they're 727 01:11:29,160 --> 01:11:39,280 reacting to it? We have several AOC meetings coming up and that might be a 728 01:11:39,800 --> 01:11:48,060 opportunity to find out what else is, what other areas are affected. 729 01:11:50,860 --> 01:11:55,520 Commissioner, just to be responsive to the request, number one we will make sure 730 01:11:55,520 --> 01:12:06,000 that the letters get to our federal delegation who will work in coordination and then secondly we will do some follow-up with some of our county colleagues in relation to this to see what information we can get for you. 731 01:12:06,220 --> 01:12:07,020 So thanks for bringing that. 732 01:12:07,300 --> 01:12:07,540 Thank you. 733 01:12:07,940 --> 01:12:08,120 Great. 734 01:12:09,260 --> 01:12:10,020 All right. 735 01:12:11,600 --> 01:12:19,640 We will now move on to item number 10 other and we've got Rick Prager speaking of the letters. 736 01:12:22,350 --> 01:12:25,890 Thank you, Chair, for having this added. 737 01:12:26,610 --> 01:12:40,190 So commissioners, as you just approved, item 7.4, I'm sorry, item 7.3, you did a ratification of a letter requesting support regarding our community initiative project. 738 01:12:40,510 --> 01:12:49,370 Again, as you're all familiar, each and every year the federal, our commission delegation holds a process in which we can apply for grants. 739 01:12:49,370 --> 01:12:55,690 We have this year applied for two, which is the Jackson Frasier Project, which was letter 740 01:12:55,690 --> 01:13:01,870 use approved, as well as the Monroe Health Center. Each, the Senate and the House, have 741 01:13:01,870 --> 01:13:08,210 their own processes. The Senate opened up their process early, which is the ratification 742 01:13:08,210 --> 01:13:17,170 that you approved in my desire to be quick on this. I only did the letter to senators 743 01:13:17,170 --> 01:13:22,990 on this for their process and then soon after I had this done representative 744 01:13:22,990 --> 01:13:28,090 Hoyle opened a per process so we want to just ask for your approval and support 745 01:13:28,090 --> 01:13:33,550 of the same exact letter except it would be from representative Hoyle and that 746 01:13:33,550 --> 01:13:38,210 process just so you know close it was very quick it's only one week it closes 747 01:13:38,210 --> 01:13:38,830 on Thursday. 748 01:13:43,050 --> 01:13:43,610 All right. 749 01:13:45,970 --> 01:13:51,190 And part of the problem, the Senate and the House have 750 01:13:51,190 --> 01:13:57,390 different schedules and so when we did this last week, 751 01:13:59,450 --> 01:14:04,420 the House's portal wasn't 752 01:14:05,280 --> 01:14:09,480 open. That's correct and I just wasn't efficient looking ahead and I should 753 01:14:09,480 --> 01:14:12,500 have just had done one letter and I could have taken care of it once, but 754 01:14:12,500 --> 01:14:15,440 I'm sorry for that, but yes, the answer. 755 01:14:16,100 --> 01:14:26,480 So we need a motion to approve the letter going to Congresswoman Hoyle. 756 01:14:26,840 --> 01:14:33,340 I move to approve a letter requesting support from Congresswoman Val Hoyle regarding CIP funding for the Jackson Fraser Wetland Boardwalk Project. 757 01:14:33,840 --> 01:14:34,260 Second. 758 01:14:35,100 --> 01:14:37,220 All in favor of the motion say aye. 759 01:14:37,400 --> 01:14:37,740 Aye. 760 01:14:37,940 --> 01:14:38,140 Aye. 761 01:14:38,140 --> 01:14:49,910 Carries is there any other other business hearing none I will recess our board 762 01:14:49,910 --> 01:14:59,970 meeting and we will reconvene here at 11 o'clock for the public hearing on 763 01:15:00,000 --> 01:15:09,400 And the matter of Board of Commissioners reconsidering of an appeal decision in the matter of land 764 01:15:09,400 --> 01:15:18,620 use application number LU-24-027. So, see you all back here at 11. 765 02:03:15,730 --> 02:03:16,450 Good morning. 766 02:03:19,300 --> 02:03:19,940 Good morning. 767 02:03:29,600 --> 02:03:39,020 We will now reconvene our board meeting for March 3, 2026. 768 02:03:40,180 --> 02:03:45,320 This is the time set for the continued hearing in the matter of the board's reconsideration 769 02:03:45,320 --> 02:03:58,000 under the authority in ORS 197.83013B of its November 17, 2025 decision approving an application 770 02:03:58,000 --> 02:04:03,880 for a conditional use permit to expand in an existing landfill. 771 02:04:05,180 --> 02:04:10,080 The Board of Commissioners' decision was appealed to the Oregon Land Use Board of Appeals in 772 02:04:10,080 --> 02:04:13,620 Luba number 2025-082. 773 02:04:14,200 --> 02:04:19,800 The Benton County case number is LU-24-027. 774 02:04:20,860 --> 02:04:26,520 To all present today, please be respectful and courteous of all who are present 775 02:04:26,520 --> 02:04:31,020 comment during the hearing and deliberations is not respectful or 776 02:04:31,020 --> 02:04:36,700 courteous. I reserve the right to remove anyone who does not abide by this 777 02:04:36,700 --> 02:04:42,240 direction or who engages in disrespectful, discourteous or disruptive behavior. 778 02:04:43,440 --> 02:04:48,780 The Board of Commissioners previously opened the hearing on reconsideration on 779 02:04:48,780 --> 02:04:55,360 January 20, 2026 and voted to reopen the written record to accept additional 780 02:04:55,360 --> 02:05:02,240 evidence, testimony, and argument regarding a limited issue. At the conclusion of that hearing, 781 02:05:02,480 --> 02:05:10,520 the Board continued the hearing to today, March 3, 2026, at 11 a.m. for deliberations. 782 02:05:11,620 --> 02:05:18,200 No additional public testimony will be taken. The purpose of this continued hearing 783 02:05:18,200 --> 02:05:23,400 is for the Board to deliberate and reach a decision on reconsideration of its previous 784 02:05:23,400 --> 02:05:35,640 decision. Under the statute at ORS 197.83013B, we must affirm, modify, or 785 02:05:35,640 --> 02:05:41,440 reverse our previous decision. In doing so, we must determine whether the 786 02:05:41,440 --> 02:05:46,960 applicant has satisfied its burden of proof to establish that the criteria in 787 02:05:46,960 --> 02:05:55,240 the BCC are met. The February 24, 2026 staff report lifts and sets out each of the applicable 788 02:05:55,240 --> 02:06:02,280 criteria which are found in the Benton County Code. We must determine whether a preponderance 789 02:06:02,280 --> 02:06:08,660 of the evidence supports or does not support our original decision that the application 790 02:06:08,660 --> 02:06:15,940 criteria are met. The preponderance of the evidence means evidence which is 791 02:06:15,940 --> 02:06:21,400 greater of greater weight or more convincing than the evidence which is 792 02:06:21,400 --> 02:06:27,940 offered in the opposition to it. In reaching our decision we may only 793 02:06:27,940 --> 02:06:33,340 consider evidence argument or testimony that is already in the record. We may 794 02:06:33,340 --> 02:06:38,000 not consider evidence argument or testimony that is not in the record. In 795 02:06:38,000 --> 02:06:44,300 In addition, evidence that is completely unrelated to the approval criteria is not relevant 796 02:06:44,300 --> 02:06:44,960 evidence. 797 02:06:45,620 --> 02:06:51,340 It is our job to evaluate the credibility and reliability of the evidence and how much 798 02:06:51,340 --> 02:06:54,340 weight to assign to the evidence. 799 02:06:55,760 --> 02:06:59,360 It is important that our decision-making is free of bias. 800 02:07:00,020 --> 02:07:05,920 Each commissioner must put aside any preconceived perspectives and make a decision based solely 801 02:07:05,920 --> 02:07:12,000 on the evidence included in the record as it applies to the standards and criteria in 802 02:07:12,000 --> 02:07:13,000 the Benton County Code. 803 02:07:14,680 --> 02:07:22,340 As provided in the Benton County Code, 51.835, the Board will consider the entire record 804 02:07:22,340 --> 02:07:29,280 of the proceeding that led to our November 17, 2025 decision, as well as evidence and 805 02:07:29,280 --> 02:07:34,660 testimony submitted during the reconsider the reconsideration proceeding 806 02:07:34,660 --> 02:07:39,300 that is within the parameters we previously set for the written open 807 02:07:39,300 --> 02:07:46,480 record period. I will now ask the board if any commissioner needs to declare any 808 02:07:46,480 --> 02:07:52,780 bias conflict of interest or additional ex parte communication not 809 02:07:52,780 --> 02:07:54,680 previously declared. 810 02:07:57,020 --> 02:08:01,900 Commissioner Shepard. Thank you. I wish to I do not have 811 02:08:01,900 --> 02:08:06,860 anything for any of the others but I will speak to my ex parte contacts I have a 812 02:08:06,860 --> 02:08:10,900 written document as I did in the first hearing and I will make sure that that 813 02:08:10,900 --> 02:08:17,580 gets submitted and posted online at the end of this hearing but I wanted to 814 02:08:17,580 --> 02:08:20,800 state that due to the importance of the issue the topic of the landfill 815 02:08:20,800 --> 02:08:23,460 often comes up with conversations with constituents 816 02:08:23,460 --> 02:08:24,420 and in local news. 817 02:08:24,840 --> 02:08:27,180 Because of the saturation of this issue locally, 818 02:08:27,360 --> 02:08:29,480 while I believe this to be a comprehensive list 819 02:08:29,480 --> 02:08:30,640 of the comments I received, 820 02:08:31,020 --> 02:08:32,700 some comments that I have since forgotten 821 02:08:32,700 --> 02:08:35,260 or that did not register to me as ex parte contacts 822 02:08:35,260 --> 02:08:37,220 may be unintentionally omitted, 823 02:08:37,660 --> 02:08:39,460 none are intentionally omitted. 824 02:08:40,780 --> 02:08:44,560 On February 6th, I received an email from Alex Ryan 825 02:08:44,560 --> 02:08:47,020 stating that if issues like the landfill aren't addressed, 826 02:08:47,480 --> 02:08:48,660 his family may move away. 827 02:08:48,660 --> 02:08:53,700 On February 22nd, I received an email on another topic from George Hutchinson that 828 02:08:53,700 --> 02:08:56,640 briefly stated approving the landfill expansion was a bad idea. 829 02:08:57,060 --> 02:09:01,760 On February 25th, I received an email from Bruce Calger criticizing staff's change of 830 02:09:01,760 --> 02:09:02,820 recommendation to denial. 831 02:09:03,180 --> 02:09:06,800 Mr. Calger offered that the same information was available before the November hearings 832 02:09:06,800 --> 02:09:08,000 and should have been considered then. 833 02:09:08,400 --> 02:09:11,940 On February 28th, I received an email from Patrick O'Dell opposed to the landfill. 834 02:09:12,240 --> 02:09:14,420 I did not read beyond the first sentence of the email. 835 02:09:14,420 --> 02:09:17,420 On March 2nd, I received an email from Helen Weingartner 836 02:09:17,420 --> 02:09:18,860 opposed to the expansion. 837 02:09:19,260 --> 02:09:20,880 I did not read beyond the first sentence. 838 02:09:21,180 --> 02:09:23,480 I'm still the chair of the Benton County Democrats 839 02:09:23,480 --> 02:09:24,780 and since becoming commissioner, 840 02:09:24,980 --> 02:09:26,600 I've recused myself from any conversations 841 02:09:26,600 --> 02:09:28,480 during any Benton County Democrats meetings 842 02:09:28,480 --> 02:09:29,500 regarding the landfill 843 02:09:29,980 --> 02:09:31,620 and handed over the meeting, 844 02:09:31,840 --> 02:09:33,660 controlled to my next in charge. 845 02:09:34,260 --> 02:09:36,720 There have been no, to the best of my knowledge, 846 02:09:36,780 --> 02:09:38,280 no meetings or discussions of that group 847 02:09:38,280 --> 02:09:41,980 since our last meeting relating to Coffin Beach, Lanfa. 848 02:09:42,620 --> 02:09:46,760 media articles. I have read, seen the title of, or someone has relayed the content of, 849 02:09:46,860 --> 02:09:50,680 the vast majority of articles and letters to the editor or editorials related to the 850 02:09:50,680 --> 02:09:54,620 reconsideration of the expansion of Coffin Beach landfill. These include articles in 851 02:09:54,620 --> 02:09:59,180 the Corvalskas at times, Albany Democrat Harold, Filomet News and other outlets. I understand 852 02:09:59,180 --> 02:10:02,760 that these articles are not a part of the record and cannot be considered when coming 853 02:10:02,760 --> 02:10:08,140 to a decision. My position on the original appeal was clear via my statement on the 854 02:10:08,140 --> 02:10:12,600 November 3, 2025 board of commissioners meeting and the subsequent vote of the board. However, 855 02:10:12,700 --> 02:10:16,540 I approached the reconsideration with an open mind to consider how new evidence could sway 856 02:10:16,540 --> 02:10:21,200 my view on the application. I can and will make a fair and impartial decision on this 857 02:10:21,200 --> 02:10:27,060 land use decision based on the record, the applicable criteria, and free from personal 858 02:10:27,060 --> 02:10:27,320 bias. 859 02:10:30,940 --> 02:10:37,400 I as well only have ex parte contacts. As Commissioner Shepard has said, there's 860 02:10:37,400 --> 02:10:46,060 many news articles. I've seen titles, headlines, read some of them. I also have received text 861 02:10:46,060 --> 02:10:51,840 messages from a community member, Kurt Wright, mostly just letting me know, hey, the GT put 862 02:10:51,840 --> 02:10:58,120 this out or a screenshot of this text, but again, it's all public information that public news 863 02:10:58,120 --> 02:11:04,320 articles. I did also receive an email to a personal email address from the Gazette Times 864 02:11:04,320 --> 02:11:09,260 reporter Cody Mann that said, my boss asked me to try connecting on an 865 02:11:09,260 --> 02:11:13,340 unofficial channel for a question about coffin butte to which I did not respond 866 02:11:13,340 --> 02:11:21,560 but I did forward to our County Council and there have also been several 867 02:11:21,560 --> 02:11:27,440 emails that have been sent to my email box with headlines that I recognized 868 02:11:27,440 --> 02:11:31,220 were most likely about the landfill and such I did not open them or read 869 02:11:31,220 --> 02:11:34,060 them, and I can still make an impartial decision. 870 02:11:36,680 --> 02:11:37,280 All right. 871 02:11:40,940 --> 02:11:47,180 This is concerning ex parte communication. At a January 30th meeting, Representative 872 02:11:47,180 --> 02:11:52,680 Finger McDonald started talking to me about Coffin Butte. I notified her that if this 873 02:11:52,680 --> 02:11:58,360 conversation continued, I would need to leave the room due to ex parte concerns. 874 02:11:58,360 --> 02:12:03,220 The conversation then got back on track. 875 02:12:05,020 --> 02:12:15,920 I want to state that I may have unintentionally omitted contact emails. 876 02:12:16,760 --> 02:12:21,550 Most of the landfill emails go directly to a folder, 877 02:12:21,550 --> 02:12:32,730 folder and I have not looked at that folder and I believe that I can make an unbiased 878 02:12:33,630 --> 02:12:34,130 decision. 879 02:12:36,580 --> 02:12:44,120 So now I will ask, does anyone present wish to rebut the substance of the 880 02:12:44,120 --> 02:12:51,200 justice-closed ex parte communications? Rebut means dispute or oppose the substance 881 02:12:51,200 --> 02:13:02,420 of the communications. If you wish to rebut the substance of the justice follows to ex parte communications, please raise your hand, and county staff will assist you. 882 02:13:09,410 --> 02:13:10,230 No hands, okay? 883 02:13:11,250 --> 02:13:16,130 All right. Now, I will ask for the staff report presentation. 884 02:13:16,130 --> 02:13:16,450 Testation. 885 02:13:20,910 --> 02:13:21,350 Testing. 886 02:13:21,670 --> 02:13:22,010 Okay. 887 02:13:22,490 --> 02:13:22,650 All 888 02:13:29,050 --> 02:13:29,170 right. 889 02:13:29,390 --> 02:13:31,670 So I'm Jesse Winterode with Winterbrook Planning. 890 02:13:31,970 --> 02:13:33,810 Thank you, Chairman Malone and commissioners. 891 02:13:34,610 --> 02:13:39,170 Acting as a contract staff planner for Benton County on this project. 892 02:13:41,410 --> 02:13:49,110 I don't want to repeat everything Chairman Malone just said, so I will not and we'll 893 02:13:49,110 --> 02:13:51,950 get right into the content of the staff report. 894 02:13:53,050 --> 02:14:00,910 We had, on November 6th, after the November 4th deliberations, the entering of or the 895 02:14:00,910 --> 02:14:03,450 pen from DEQ letter came out. 896 02:14:04,010 --> 02:14:09,530 And that had seven Class 1 violations related to monitoring, gas control, and site operations. 897 02:14:10,410 --> 02:14:15,810 After that, the – we can move on to the next page. 898 02:14:16,730 --> 02:14:18,590 There was a timely appeal to Luba. 899 02:14:18,590 --> 02:14:26,290 up the board through the decision for reconsideration, reopen the record allowing the submission 900 02:14:26,290 --> 02:14:35,830 of the DEQ PEN, and then we looked at that PEN and carried on to the next page, very carefully 901 02:14:35,830 --> 02:14:41,830 and said, how does this PEN relate to our previous findings, our previous information 902 02:14:41,830 --> 02:14:49,930 that we used. We talked to MFA, the contract engineering firm for this project, and asked 903 02:14:49,930 --> 02:14:54,890 them what is the technical information in this pen, how does that relate to anything 904 02:14:54,890 --> 02:14:59,670 we've looked at so far. We also had a lot of testimony, I think over 150. 905 02:15:00,000 --> 02:15:07,100 Submissions of test money on that subject. So what the staff report did was we focused 906 02:15:07,100 --> 02:15:16,540 on what we could see made a difference based on the pen. And it's overwhelmingly very similar, 907 02:15:16,540 --> 02:15:24,420 but the odor findings changed significantly and our overall recommendation changed from 908 02:15:24,420 --> 02:15:32,860 approval to denial. As such, we removed conditions throughout the staff report as we couldn't 909 02:15:32,860 --> 02:15:39,960 find appropriate conditions to address the lack of information that we have on odor that 910 02:15:39,960 --> 02:15:41,760 led to our recommendation for denial. 911 02:15:43,870 --> 02:15:51,550 So what we saw from MFA was that some of the 912 02:15:52,250 --> 02:15:58,510 the fundamental application components there, their argument on odor, those assumptions that 913 02:15:58,510 --> 02:16:01,930 went into the model might not be supported by evidence. 914 02:16:03,170 --> 02:16:11,270 And that's because one of the most important pieces was an even distribution of gas coming 915 02:16:11,270 --> 02:16:16,650 out of the landfill, but there was an evidence that that was the case, and there was evidence 916 02:16:16,650 --> 02:16:25,290 of 3DQ violations regarding operations and measuring of the landfill gases. 917 02:16:26,150 --> 02:16:33,930 So that's what changed our mind, and we show that in the staff report and have the MFA 918 02:16:33,930 --> 02:16:34,810 letter to support that. 919 02:16:39,180 --> 02:16:45,700 So the fundamental pieces, the applicant's service mission of monitoring figures are 920 02:16:45,700 --> 02:16:48,560 showing that large portions of the landfill were not surveyed. 921 02:16:48,560 --> 02:16:52,760 And this is something that, you know, the applicant submitted to DEQ. 922 02:16:53,180 --> 02:16:54,880 DEQ also noticed. 923 02:16:56,120 --> 02:17:07,540 And as we can see by those two maps, we have a lot of the air of the landfill that wasn't surveyed by the applicant and their submissions to DEQ. 924 02:17:09,280 --> 02:17:15,500 And as I said, the distribution of surface gas submissions was not. 925 02:17:16,940 --> 02:17:25,120 There wasn't evidence that it was evenly distributed currently, and that was the fundamental basis 926 02:17:25,120 --> 02:17:31,620 for the odor impacts on surrounding adjacent land uses. 927 02:17:32,640 --> 02:17:41,360 So the other piece of that is if you have a landfill that's not operating consistent 928 02:17:41,360 --> 02:17:50,200 with how it should, we can't really use that as the base case for the character of the area in terms of odor. 929 02:17:50,960 --> 02:18:02,160 So we don't want to say this landfill inconsistently operating is the norm that one should assume for the area. 930 02:18:02,300 --> 02:18:09,080 And so absent that we didn't have good evidence for character of the area either. 931 02:18:12,180 --> 02:18:25,460 The applicant's final argument talked about 90% collection of greenhouse gases over four 932 02:18:25,460 --> 02:18:31,920 years period, but it didn't really impact the one they provided a link and didn't really 933 02:18:31,920 --> 02:18:37,060 have evidence for that, how that relates to their odor study, how that relates to much 934 02:18:37,060 --> 02:18:43,800 of anything that we're looking at, but it also didn't address the problem of the even 935 02:18:43,800 --> 02:18:45,380 distribution over the landfill. 936 02:18:45,500 --> 02:18:49,160 That was the core issue that MFA identified. 937 02:18:50,320 --> 02:18:57,540 So if you have landfill gases that are moving in specific areas at greater concentrations, 938 02:18:57,620 --> 02:19:02,300 that could lead to greater odor impacts related to those areas where it's coming 939 02:19:02,300 --> 02:19:02,560 out. 940 02:19:03,480 --> 02:19:21,040 And so that sort of also supported previous adjacent property under testimony, said this odor model doesn't really reflect our lived experiences, which we have seen many times over the past year. 941 02:19:21,700 --> 02:19:27,340 And then we have a technical reason why that would be the case in the pen. 942 02:19:27,340 --> 02:19:28,360 So 943 02:19:32,480 --> 02:19:37,940 overall, our conclusion was they haven't met their burden of proof in relation to odor 944 02:19:37,940 --> 02:19:42,240 impacts, on adjacent land uses or a character of the area. 945 02:19:43,680 --> 02:19:49,160 So we can't – and as I said before, we can't recommend conditions that address those 946 02:19:49,160 --> 02:19:57,820 problems that, you know, why – what is the appropriate assumption for the odor model? 947 02:19:57,820 --> 02:20:05,320 or what is the appropriate character of the area to compare when we're looking at the 948 02:20:05,320 --> 02:20:08,120 change from existing to the future. 949 02:20:08,540 --> 02:20:15,020 And lacking that information, we don't have enough to recommend conditions, and that led 950 02:20:15,020 --> 02:20:17,960 us to a recommendation for denial. 951 02:20:19,360 --> 02:20:23,980 And so based on the findings of the staff report, information in the record, staff 952 02:20:23,980 --> 02:20:27,760 concludes that odor analysis and evidence provided by the applicant do not sufficiently 953 02:20:27,760 --> 02:20:32,660 demonstrate that the proposal will not seriously interfere with uses on adjacent properties, 954 02:20:33,300 --> 02:20:39,000 the character of the area, or the purpose of the forest conservation zone, which in a roundabout way 955 02:20:39,000 --> 02:20:46,700 refers back to that same issue. As the forest conservation zone, they included the findings 956 02:20:46,700 --> 02:20:52,140 for that in the general conditional use findings. And so if those conditional use findings 957 02:20:52,140 --> 02:20:56,720 findings don't work, then the purpose of the forest zone findings also don't work. 958 02:20:57,440 --> 02:20:58,660 And so that's in here as well. 959 02:20:59,180 --> 02:21:04,860 And therefore, staff recommends that on reconsideration, the board denied the application. 960 02:21:09,540 --> 02:21:11,440 Any questions of staff? 961 02:21:12,540 --> 02:21:16,740 I have questions, but I think I'll save them for during deliberations. 962 02:21:17,160 --> 02:21:18,380 Would you prefer? 963 02:21:20,020 --> 02:21:22,480 Commissioner, the questions need to get out now. 964 02:21:22,800 --> 02:21:24,840 No time during deliberations for questions. 965 02:21:24,840 --> 02:21:32,140 Okay, so I have two questions that I want to ask staff to make sure the answers are easily accessible on the record 966 02:21:32,880 --> 02:21:34,580 First to confirm 967 02:21:34,580 --> 02:21:42,680 The applicant has not submitted evidence into the record that they have met the response times required by DEQ in the pen, correct? 968 02:21:44,000 --> 02:21:48,940 That they have met the the time the the dates that DEQ said they needed to meet 969 02:21:49,620 --> 02:21:54,460 Certain criteria by they have not submitted evidence into the record that they have done so is that correct? 970 02:21:54,460 --> 02:22:00,480 That's correct. Okay. And then the second question relates to page 9 of the staff report. 971 02:22:01,220 --> 02:22:09,420 Page 9 has a section called context of existing use versus proposed expansion. I want to read 972 02:22:09,420 --> 02:22:13,380 through it just for a second because I have a question about a very specific word, so 973 02:22:13,380 --> 02:22:17,960 I just want to read through both paragraphs. Some commenters and planning commissions 974 02:22:17,960 --> 02:22:22,560 argued that the proposed landfill expansion application should be reviewed as a new use 975 02:22:22,560 --> 02:22:25,040 without considering the existing landfill impacts 976 02:22:25,040 --> 02:22:25,620 as a baseline. 977 02:22:26,220 --> 02:22:28,880 However, evaluating an expansion of an existing use 978 02:22:28,880 --> 02:22:31,000 as an entirely new use would not be consistent 979 02:22:31,000 --> 02:22:31,940 with county practice. 980 02:22:32,560 --> 02:22:34,360 Staff reviewed this conditional use application 981 02:22:34,360 --> 02:22:36,660 as an expansion of the existing landfill. 982 02:22:37,140 --> 02:22:38,820 Thus, the existing landfill operations, 983 02:22:39,100 --> 02:22:41,220 as they had been previously approved by Benton County, 984 02:22:41,400 --> 02:22:43,520 are important context and they form the base case 985 02:22:43,520 --> 02:22:45,660 from which potential impacts may be measured. 986 02:22:46,020 --> 02:22:47,900 Now that's been in our staff reports before, 987 02:22:47,980 --> 02:22:50,560 but I wanted to specifically talk about paragraph two, 988 02:22:50,560 --> 02:23:01,860 which says, however, as indicated by the November DEQ PEN, DEQ and EPA take the position that the existing landfill is not operating consistently with DEQ requirements. 989 02:23:02,300 --> 02:23:09,160 This means that for impacts related to violations identified in the November DEQ PEN, the county may, that's an important word here, 990 02:23:09,400 --> 02:23:16,740 the county may not be able to consider existing conditions as a reliable base case for purposes of conditional use review. 991 02:23:16,740 --> 02:23:19,900 So the word may has a couple different uses. 992 02:23:20,540 --> 02:23:23,620 It can mean both must or might. 993 02:23:24,180 --> 02:23:29,520 And so I wanted to clarify that in this case it's more appropriate to consider that as might. 994 02:23:29,960 --> 02:23:36,760 And that it is up to the discretion of the board on whether or not to consider the existing conditions. 995 02:23:36,880 --> 02:23:37,240 Is that correct? 996 02:23:37,500 --> 02:23:37,860 That's correct. 997 02:23:38,140 --> 02:23:38,820 Okay, thank you. 998 02:23:43,400 --> 02:23:45,480 Any other questions of staff? 999 02:23:46,340 --> 02:23:49,880 If not, thank you for your efforts. 1000 02:23:51,100 --> 02:23:55,980 And I will now open the hearing for deliberations. 1001 02:23:57,180 --> 02:23:58,320 Is there a discussion? 1002 02:24:01,160 --> 02:24:04,540 Did we have a motion on the table before we deliberate? 1003 02:24:05,860 --> 02:24:07,380 That is fine. 1004 02:24:09,120 --> 02:24:13,080 Commissioner, if someone wants to make a motion and then you can deliberate on it, 1005 02:24:13,080 --> 02:24:18,000 Other groups have a discussion and get consensus on a motion. 1006 02:24:20,330 --> 02:24:21,130 It's up to the chair. 1007 02:24:21,610 --> 02:24:24,230 I have a motion if you're ready, Chair. 1008 02:24:25,470 --> 02:24:26,530 All right. 1009 02:24:27,610 --> 02:24:43,490 I move to adopt an order reversing our November 17, 2025 decision and that the conditional use permit be denied based on evidence in the record and findings in the February 24, 2026 staff report and conclusions developed by the Board of 1010 02:24:43,490 --> 02:24:46,650 commissioners during these deliberations and that these findings and 1011 02:24:46,650 --> 02:24:49,710 conclusions be adopted as the final decision of the board. 1012 02:24:53,290 --> 02:24:56,030 Second. It's been 1013 02:24:56,030 --> 02:25:01,810 moved and seconded. All in favor of the discussion of 1014 02:25:06,450 --> 02:25:07,830 the 1015 02:25:07,830 --> 02:25:14,550 motion. Commissioner Wise. Thank you. It's in moments like these that I like to 1016 02:25:14,550 --> 02:25:18,090 remind myself what Maggie Kuhn said which is speak your mind even if your 1017 02:25:18,090 --> 02:25:18,870 voice shakes. 1018 02:25:20,880 --> 02:25:26,800 I have expressed on the record in the past my disappointment in the tactics 1019 02:25:26,800 --> 02:25:33,120 that some of the opponents, some not all, of the landfill expansion have used in targeting 1020 02:25:33,120 --> 02:25:39,360 county staff and myself. And I have also expressed on the record my disappointment in some of 1021 02:25:39,360 --> 02:25:45,040 Republic Service's business practices. There have been rumors from both sides about 1022 02:25:45,040 --> 02:25:50,100 conspiracies and some intimidation tactics attempted by both sides. 1023 02:25:50,920 --> 02:25:55,480 However, my job is to set aside the drama and consider the merits of the application 1024 02:25:56,060 --> 02:25:58,720 based on the facts as applied to the criteria. 1025 02:25:59,880 --> 02:26:04,980 Like every other quasi-judicial land use decision I've made in my eight years as an 1026 02:26:04,980 --> 02:26:11,200 elected official, I am able to set aside whatever feelings I have and consider whether 1027 02:26:11,200 --> 02:26:15,580 to approve the application by looking at evidence in the record as it relates to the 1028 02:26:15,580 --> 02:26:22,600 applicable criteria. My decision is not based on any personal feelings about any participants 1029 02:26:22,600 --> 02:26:31,300 in this proceeding. I will never let personal feelings or intimidation or bullying impact 1030 02:26:31,300 --> 02:26:37,300 my professional decisions. I would rather be recalled or run over by a garbage truck 1031 02:26:37,300 --> 02:26:42,920 then compromise my ethics. Again, I reached my decision today based on the 1032 02:26:42,920 --> 02:26:48,580 facts as applied to the criteria. I would also like to speak briefly about the 1033 02:26:48,580 --> 02:26:54,480 DEQ letter. I view the evidence in the DEQ letter and the evaluation of that 1034 02:26:54,480 --> 02:26:58,960 letter by the county's experts as more credible than republic's expert 1035 02:26:58,960 --> 02:27:04,300 evidence. The county's experts evaluated the DEQ letter and concluded 1036 02:27:04,300 --> 02:27:10,420 that the DEQ letter includes evidence that raises serious and legitimate questions about the methodology 1037 02:27:11,160 --> 02:27:17,400 and assumptions in Republic's odor study, which Republic has not provided adequate rebuttal to. 1038 02:27:18,300 --> 02:27:23,440 Therefore, I place greater weight on the DEQ letter and the county's experts than I do on 1039 02:27:23,440 --> 02:27:24,480 Republic's odor study. 1040 02:27:34,050 --> 02:27:36,530 Is it your turn? All right. 1041 02:27:39,920 --> 02:27:43,420 As the planning staff, the 1042 02:27:43,420 --> 02:27:48,360 Bent County planning staff report pointed out, seven areas where Republic was in 1043 02:27:48,360 --> 02:27:57,960 serious, meaning class one violations of DEQ rules. And this is the basis for my 1044 02:27:57,960 --> 02:27:58,360 decision. 1045 02:28:01,480 --> 02:28:02,860 Any other discussion? 1046 02:28:03,400 --> 02:28:09,840 Yeah. After careful consideration and review of the original record and information added 1047 02:28:09,840 --> 02:28:15,800 to the record during the reconsideration process, I will once again be voting to deny LU24-027 1048 02:28:15,800 --> 02:28:17,800 for the expansion of Coffinview landfill. 1049 02:28:20,220 --> 02:28:23,160 None of the new information in the record 1050 02:28:23,160 --> 02:28:27,600 alleviated my concerns from the original application regarding impacts on adjacent 1051 02:28:27,600 --> 02:28:32,560 properties or undue burdens on public improvements, facilities, utilities or services. 1052 02:28:33,500 --> 02:28:36,100 For the details of those concerns, please review the original record. 1053 02:28:36,940 --> 02:28:42,260 I also agree with the staff report for this public hearing that the pre-enforcement notice or 1054 02:28:42,260 --> 02:28:47,080 the PEN calls into question the accuracy of the applicant's odor study. The ample evidence 1055 02:28:47,080 --> 02:28:51,820 in the record from residents living adjacent to the site and beyond relate significant odor 1056 02:28:51,820 --> 02:28:57,720 concerns. I am inclined to give weight to the lived experiences of the residents living 1057 02:28:57,720 --> 02:29:03,400 adjacent to and beyond the landfill. And I am also placing greater weight on the DEQ letter 1058 02:29:03,400 --> 02:29:09,940 as evaluated by MFA as opposed to the odor study provided by the applicant. And then 1059 02:29:09,940 --> 02:29:12,400 I had my two questions, which were already answered. So thank you. 1060 02:29:13,600 --> 02:29:18,120 Commissioner, can I clarify? So in your motion, and I might ask you to repeat 1061 02:29:18,120 --> 02:29:27,920 But was your motion to reverse your decision and deny the application and adopt the staff report as the findings in conclusion? 1062 02:29:28,640 --> 02:29:30,160 Correct. I can read it again if you'd like. 1063 02:29:30,340 --> 02:29:30,900 That would be great. 1064 02:29:30,900 --> 02:29:36,720 So the motion is to adopt an order reversing our November 17, 2025 decision and that the conditional 1065 02:29:36,720 --> 02:29:40,980 use permit be denied based on evidence in the record and findings in the February 24, 1066 02:29:41,140 --> 02:29:46,020 2026 staff report and conclusions developed by the board of commissioners during these 1067 02:29:46,020 --> 02:29:50,880 deliberations and that the findings and conclusions be adopted as the final decision of the 1068 02:29:50,880 --> 02:29:55,920 board. The intention behind this motion is that the staff report, which I believe to be 1069 02:29:55,920 --> 02:29:59,960 comprehensive would serve as the findings of facts. 1070 02:30:09,160 --> 02:30:09,700 Okay. 1071 02:30:10,400 --> 02:30:13,840 And we had a second on that. And so we still have a second on that. Okay. 1072 02:30:15,360 --> 02:30:16,000 Go ahead. 1073 02:30:16,500 --> 02:30:17,040 Okay. 1074 02:30:18,140 --> 02:30:20,560 It's been moved in second ed. 1075 02:30:21,240 --> 02:30:23,320 All in favor of the motion. Say aye. 1076 02:30:23,740 --> 02:30:23,900 Aye. 1077 02:30:24,180 --> 02:30:24,300 Aye. 1078 02:30:26,260 --> 02:30:27,160 Any opposed? 1079 02:30:28,680 --> 02:30:29,620 Motion carries. 1080 02:30:30,560 --> 02:30:34,600 And this may help with your concerns. 1081 02:30:35,560 --> 02:30:39,680 The findings of fact and conclusions of the law are adopted. 1082 02:30:40,300 --> 02:30:50,260 A decision of the Board of Commissioners becomes final on the date of the Board of Commissioners adopts written findings of fact and conclusions of law. 1083 02:30:51,160 --> 02:30:59,120 The just adopted written decision is the final written decision of the Board of Commissioners adopted this date March 3, 2026. 1084 02:30:59,840 --> 02:31:05,520 The final written decision of the Board of Commissioners may be appealed to the Land 1085 02:31:05,520 --> 02:31:06,600 Use Board of Appeals. 1086 02:31:07,380 --> 02:31:09,380 This hearing is adjourned. 1087 02:31:26,690 --> 02:31:28,770 Okay, we get it. 1088 02:31:29,210 --> 02:31:30,410 Just to manage. 1089 02:31:30,930 --> 02:31:31,070 You? 1090 02:31:32,590 --> 02:31:36,130 No, but I've got to recess the meeting. 1091 02:31:36,610 --> 02:31:39,390 The hearing was adjourned. 1092 02:31:42,050 --> 02:31:42,770 Yeah. 1093 02:31:42,770 --> 02:31:52,530 All right. Could you quiet down, please? Could you quiet down, please, so we can finish our 1094 02:31:52,530 --> 02:31:53,150 board meeting? 1095 02:32:01,350 --> 02:32:07,190 That's what I was going to ask. Nothing else for me. All right. Our board meeting 1096 02:32:07,190 --> 02:32:08,110 as adjourned.