[0:00] Very good work. [0:03] » All right, welcome everybody. Let's call [0:05] our library building committee meeting [0:07] to order. It is 6 o'clock exactly. [0:12] Go right to uh hold business which uh [0:15] are minutes from August 19th. [0:20] » So move have a motion by Mr. Ike. [0:24] » Second. We have a second by Mr. Bur. [0:26] Anybody want to add any comments or [0:28] corrections? close. [0:30] » I think Peter Casti's name is [0:32] misspelled. [0:32] » Yeah, he didn't want to spell it on my [0:35] part. [0:36] » Good catch. Thanks. Any other comments? [0:40] » Sure. I want [0:41] » Can somebody tell me how to spell it? [0:45] » It's on the website. [0:46] » Uh, so Joe, there's one page. Uh, can I [0:49] just see your [0:51] » I'm not sure I asked this question. I [0:54] thought it was actually Clark. [0:57] Um, I asked if the resequencing would be [1:00] tested. I'm on page two under the [1:04] construction manager report. [1:06] We're talking about HVAC. It's like the [1:08] fourth or fifth bullet. [1:10] » Okay. [1:10] » The first one is Okay. I asked about [1:12] EDI. And then the second one asking [1:15] about the resequencing. I think that [1:18] might have been Clark. Does anybody [1:20] remember? Or was it you, Matt? [1:22] » It must have been Clark, I think. [1:24] » Oh, here he comes, actually. [1:26] Take this off the tape though, right? [1:29] » Uh, yeah. [1:30] » Thought it was him. But [1:33] » Well, here Clark is here, so we could [1:35] actually ask him. Um, I mean, I just [1:38] didn't remember asking that. [1:40] » I might have. [1:42] » Let's ask what. We got a question for [1:44] you on the minutes right now. It says [1:46] Patrick Dorenzo asked if the [1:48] resequencing would be tested. [1:51] Do you remember you asked that? effort [1:54] doesn't last. [1:57] » All right. [1:57] » Okay. Then maybe [2:01] he uses he uses the recording. [2:03] » Just wanted to confirm. [2:04] » Any other corrections? [2:08] All right. All in favor of approving the [2:10] minutes as corrected. Please say I. [2:14] » I. [2:15] » Any nays? [2:17] Stains. [2:21] All right. you. Let's go to um new [2:26] business and we have Anthony is here to [2:29] talk about crosser. All righty. [2:34] My screen [2:36] is so short and sweet tonight compared [2:38] to past meetings. All right. [2:40] » Uh item A here we have just a quick [2:42] update what's going on. EDI is going to [2:44] be mobilizing here in the next couple [2:46] weeks for the warranty replacement [2:47] plantings as as well as receding the [2:50] bare areas uh sometime within the like I [2:52] said the next few weeks. The plaza [2:54] concrete cing uh testing should and [2:57] analyticals should be here probably [2:59] within the next week or two. Uh so once [3:01] we get that reporting and that [3:02] information we will distribute to the [3:04] team accordingly. Proposal 34 um [3:07] proposal request number 34, the air [3:09] handler resequencing has been scheduled [3:12] for this Thursday and uh this f next [3:14] Thursday and Friday. Uh we have carrier [3:17] MJ Daily Balancing. Uh we have a whole [3:20] crew coming in to finish that that task. [3:23] Proposal request number 35, which is the [3:25] pressure relief and the heat relief at [3:27] the community room in the AV closet. [3:29] That's also scheduled for next week. [3:31] We're waiting for a confirmation of a [3:33] one-day installation time frame from MJ [3:35] Dailyaly and their second tier [3:37] subcontractor who'll be working on that. [3:39] Um, and this will be provided that daily [3:42] update will be provided to the library [3:43] staff and DBW to to allow that work to [3:46] happen and commence. All right, that's [3:49] kind of where we are, where we stand. I [3:51] do have Carrier coming in on Friday to [3:53] finish the the uh compressor work. Uh, [3:56] again, they came out here last week to [3:58] do that work. they were uh had some more [4:00] damaged components that have come in. Uh [4:03] so they got those replaced and they are [4:05] coming back in to complete that work [4:07] this Friday. I don't know what time yet, [4:10] but we will coordinate with uh Ken [4:12] Sharon over at Carrier [4:14] when happens. [4:16] » Questions for Anthony on schedule? [4:19] » I have a bunch of questions starting [4:21] with EDI to start working on warranty [4:23] replacement planting. So, I saw in the [4:25] minutes that it said that that had [4:26] already commenced last meeting. [4:29] » Um, the provisions and getting the the [4:31] plants ready and inventory did. [4:34] » Is there a list of what's being [4:35] replaced? [4:36] » I could get you a list. I've been [4:37] requesting actually a list from them too [4:39] and a list of surviving plants from the [4:41] last two years for the embankment at the [4:43] Washbrook as well. [4:45] » Okay. Um, is what is the window to get [4:48] the fall planting done? I think you have [4:50] until October at some point until I [4:53] don't know what that exact date is. [4:56] Google it or ask EDI directly what that [4:58] that time frame is but basically [5:01] September and October I believe. [5:03] » Um [5:06] also I noticed that the ground coverings [5:10] um I don't know what type of plant that [5:11] was but it seems that they did not [5:13] really take hold. So, one of the ground [5:16] covering by the [5:19] trash receptacles and recycling that [5:22] seems to have taken, but the one that's [5:25] right on the concrete where people stand [5:26] by that tree, it's all just mulch. So, [5:30] is are the ground coverings were also is [5:33] that also [5:34] » If RTOR Sean flagged it and the uh EDI [5:38] have flagged it, it's going to get [5:40] replaced. But if not, I'll go take a [5:41] look before I leave. Take a picture of [5:43] it and I'll send it to [5:44] » Perfect. Um, can we also see the RTOR [5:47] and Sean report of what was flagged? I [5:50] just want to compare it to what [5:52] » Yeah, I could get that. I think that's [5:53] been distributed to the team a while [5:54] back. Uh, we were [5:55] » Is that the Excel document? [5:56] » That was the Excel document. That was a [5:58] while back. [5:59] » Make sense of that. There's no visual [6:02] » Any photos along to tag along with that [6:04] that list, but I will I will provide [6:06] that that director Segan list again. [6:08] » Okay. Um, I know it's been a while since [6:11] that list was derived because we weren't [6:13] in the planting season um at that point [6:15] in time. So, we had to wait for this [6:16] this time frame to get it done. [6:19] » When is the warranty up on the plants? [6:22] » That's a one year one-year warranty. So, [6:24] I would think [6:25] » October 28th. [6:26] » Yeah. [6:26] » Okay. So, the other question I have has [6:29] to do with the dog woods because I know [6:31] that [6:31] » Those were on the list. [6:33] » Oh. Oh, so the dog woods are going to be [6:35] replaced. [6:35] » Yes. [6:36] » Oh, that's great. [6:38] » A lot of not let us know. But again, [6:40] once DDI mobilizes here, we want to I [6:42] want to be here or somebody should be [6:43] here to take a look at what they're what [6:45] they're swapping out. [6:47] » Yep. [6:47] » And then my last question is to do with [6:50] the weeding. [6:52] » Is is EDI supposed to be cleaned up? [6:55] » When they're coming back to do the [6:56] plantings, they're going to clean up of [6:57] the beds and everything. And then at [6:59] that point, I think Matt, I think that's [7:01] when they're they're finished up. [7:02] » Okay. [7:03] and the bare areas that are mentioned, [7:05] that's the grass, [7:07] » The grass back in. [7:08] » They're going to they're going to rece [7:09] that and we're going to have them do the [7:11] the sidewalk up to the sidewalk that [7:13] » That's awesome. Thank you so much for [7:14] that. [7:14] » We're best to get them to do that. [7:16] » Okay. And I also noticed um right in [7:18] front of the glass facade between the [7:20] pinnoke. It also looks like there's some [7:22] bare spots in there. [7:23] » Well, we'll have to have that. [7:25] » Okay. [7:26] » Um [7:29] one more question about [7:31] and [7:42] » Too if anybody sees them out here too, [7:44] don't be don't be afraid to go out and [7:46] and you know chat with them and talk [7:47] with them as well. [7:48] » Okay. Sometimes I haven't seen them in a [7:50] while, but it just might be the timing [7:52] of when they come. [7:54] » We can come back to you. [7:55] » Okay. [7:56] » That was just about the EDI. [7:58] » Okay. [7:58] » You got other things? [7:59] » I got other things, too. um [8:04] for the AV room closet. So, this [8:07] proposal to fix it, what what does that [8:10] mean? Pressure relief and heat relief. [8:12] » Well, they're putting uh based on the [8:14] proposal request provided by the [8:15] engineer record and the design team. [8:17] We're putting in a larger vent and [8:19] another piece of duct work to vent the [8:22] pressure to alleviate that noise, the [8:24] pressure noise that we hear when we open [8:26] that that vestibial door up, [8:28] » As well as provide enough cooling and [8:30] ambient air temperature to allow it to [8:32] pass through to to cool off that AV [8:34] closet. [8:35] » Okay. So, because we know it's still so [8:38] warm in there and we're in the cooling [8:40] time frame, have we ever talked about [8:42] putting in a split unit? [8:44] » In the RFI that we asked a couple months [8:47] ago, actually, when we were dealing with [8:49] this issue, first and foremost, we put [8:50] the suggested solution of a split uh [8:53] system in there and it was struck down [8:56] and we've installed. [8:58] Currently, what we have now was was a [9:00] proposal request and now we're basically [9:03] proposal request. Let's call it number [9:04] two. contingent is making the openings a [9:07] little bit bigger with another another [9:08] piece of duck work. [9:09] » Okay. So, when that is done and we're in [9:12] heating season, can we test out what the [9:14] temperature is in that room? And if it's [9:17] still over 80° regularly, can we revisit [9:21] this solution? [9:22] » Yeah, it would have to be revisited [9:23] through RZ. [9:26] » Okay. [9:27] » We just build to it. [9:28] » We just build to it. Okay. um because [9:30] we're really concerned about that and it [9:32] impacting the the length of [9:36] » Of of course understood. That's a that's [9:38] a design team question. [9:40] » So okay, got it. Um [9:46] the the HVAC concerns. [9:50] So, [9:52] I see how short and sweet that is, but I [9:55] just want to for the record talk about [9:58] how we've had we're we've been having [10:00] HVAC meetings and just how complicated [10:04] this is this issue is. And I know we [10:08] keep saying there's just a few things [10:10] left, but those few things left require [10:12] many brains, [10:13] » Many people, [10:14] » And [10:16] things that we hope will work to get to [10:18] the next step. [10:20] So [10:26] I'm curious about this resequencing [10:29] one. So I know that we had the radiant [10:31] heating is still going on in our offices [10:34] even though it's not supposed to. [10:35] » It's part of the temporary systems right [10:38] now to control humidity within the [10:40] space. [10:41] » Okay, I see. So the new resequencing [10:44] » Will alleviate that issue. those those [10:46] radiant panels won't come on until that [10:48] set point is is set to where it's at [10:50] provide the adequate heat correct during [10:53] the during the heating season. [10:55] » Um and I'm I'm also curious about um [11:01] paying for resequencing. [11:04] You know I how many times have we paid [11:06] for resequencing at this point? [11:08] » We got a change order proof last last [11:10] committee meeting. [11:11] » So just once. [11:12] » Just once. Okay. Um, [11:17] and [11:20] when this work is done next week, [11:24] is that the end of the to-do list or is [11:26] there more things after next Thursday? [11:28] » That should be the end of the to-do [11:30] list, but after that work gets installed [11:32] and everything is in place, programming, [11:35] etc., we will have our commissioning [11:38] agent Vanzel coming in and doing some [11:40] final checks and balances of the [11:41] systems. [11:42] » Okay. All right. Uh they're going to be [11:44] reviewing the radiant heat. We're going [11:45] to be balancing the systems to those new [11:47] parameters, let's call it, based on the [11:49] resequencing. [11:51] » Then that should be [11:54] should be it. [11:54] » Okay. Okay. Good. I'm hoping that that [11:57] is [11:57] » I'm hoping say rosary say a couple [12:00] prayers [12:01] » With the exception RTU number two. [12:04] » Those parts have not been promised. [12:06] » Right. So those so those parts that [12:08] remember those wire harness issue that [12:10] they were replacement under warranty. [12:11] They are still they can't seem to find a [12:14] part or piece for that. That would be [12:15] the only thing that's left. But again, [12:17] air number two is functioning. Well, [12:20] they my understanding is they repaired. [12:23] They're promised to replace. Correct. [12:26] That's well said. We have everything we [12:28] need, but it's a repaired item and we're [12:32] going to get a new item. Wiring [12:35] at some point. One carrier who gets [12:37] their head out of the sand. [12:40] Um, [12:42] » And [12:43] I I know that we were still finding [12:46] things, the compressors not being [12:48] online, whatever that issue was. [12:51] » Um, [12:54] I'm just worried that since we didn't [12:56] take that into account and we were doing [12:58] all of these things, how that impacts [13:02] all the things that we did. That makes [13:04] sense. It should. It should. [13:07] Um, [13:10] I think I think that that is it. Then [13:13] » I I just want to amend [13:16] how you open that whole sequence, [13:19] Elizabeth. [13:19] » Okay. [13:20] » You're correct. Complicated. A lot of [13:22] people involved, but that's behind us [13:26] and we're looking at the solutions as a [13:29] result of everybody getting involved and [13:32] figuring it out. And now it's probably [13:36] going to get done and you we're there. [13:38] So, you know, I don't want people to [13:41] feel alarmed that oh my god, there's [13:43] still things that aren't working and it [13:45] doesn't and this and you know, we're in [13:47] a really good place with this. It's [13:48] taken a very long time. Um, but uh [13:53] unfortunately that's kind of the nature [13:54] of this. [13:56] Anytime you try and do anything in [13:58] construction, it takes longer than you [13:59] think. [14:00] » Yes. said, "If it was as simple as going [14:02] to my grandmother's house and turning on [14:04] the window unit and setting the [14:05] temperature and call it a day, we're [14:06] good." [14:07] » So, um, no, I I I feel good about where [14:10] we're at with with all this. Um, so [14:16] » We're saying the same thing at our next [14:17] meeting. [14:18] » We're saying the same. Okay. And I found [14:20] what I did not ask about in regards to [14:22] EDI, and that was the native grasses [14:27] » They're growing in. [14:28] » Okay. So, [14:29] » We're not going to mow them down. [14:30] Nobody's going to touch them. We're [14:32] gonna let them grow. [14:32] » Okay. And that was what was originally [14:35] designed for the native. [14:37] » Correct. [14:38] » Good. So, what we are seeing is what's [14:40] going to remain. [14:41] » Yes. [14:41] » Okay. [14:41] » As long as it doesn't get mowed down or [14:43] some sort of maintenance on there. So, [14:45] we were told we can only mow it once a [14:47] year, [14:48] » Right? [14:49] » And that's to allow the water to come up [14:51] and down as needed. If anything, [14:53] » Everything the vegetation to grow. I [14:56] don't know if it's like a wildflower mix [14:57] type of thing, but [15:00] » In the days. [15:00] » Sorry to inter interrupt, but Scott's in [15:03] the waiting room. He's texting me. I'm [15:05] sorry to interrupt. [15:12] » Thank you. Sorry to interrupt. [15:14] » Please let Scott in. [15:16] » Okay. [15:17] » Thank you. [15:18] » Okay. Don't be late. [15:21] » And I guess I have one more question [15:22] that's related to the budget. Are we [15:25] still holding money for the HVAC [15:27] repairs? [15:29] » That segway right into that. [15:31] » Perfect. [15:32] » Yes, that's new business. [15:36] » Okay, you're good, Elizabeth? [15:37] » Yes. Thank you. [15:38] » Other questions for Anthony at this [15:40] point? Matt, [15:40] » Just have one. The EDI where it mentions [15:43] about the bank planning of those plants. [15:45] Where where did we [15:48] not exactly sure where we left off [15:50] » Right now? There's a there's some things [15:52] happening. I got to get the list of [15:53] plants that hopefully have survived the [15:56] two years that they have been, you know, [15:58] being held. Um, and the other question [16:01] is is the potential cost associated with [16:04] those plantings at the embankment right [16:07] now that we have this wildflower mix or [16:09] not the wildflower, the conservation mix [16:10] that's growing that was originally [16:12] planted that seems to be taken off fine. [16:15] EDI was, you know, instead of filling [16:18] that off and redoing it again and [16:20] everything's growing back fine, you [16:22] know, they they think there's going to [16:23] be some additional cost through them for [16:26] those embankment plantings. So, that's [16:28] kind of where there's a two-step process [16:30] here. What plants have survived, if any [16:32] at all, at this point in time, and then [16:35] what the potential cost would be for the [16:37] labor installation for [16:39] what? [16:43] » It's all part of that. It was all part [16:44] of the original the original original [16:46] contract. So what what survived for the [16:48] original contract at those would be [16:50] installed if they survived or if they [16:54] didn't survive we would have to [16:55] repurchase them. Same kind. This is a [16:59] design. [17:03] Excuse me. [17:06] Anything else? Any questions for Anthony [17:08] at this point? [17:10] Okay. Next, Anthony. [17:11] » All righty. Let's go down to item V [17:13] here. Requisitions and potential change [17:15] orders, [17:16] » Which I have to speak that go ahead. [17:19] Okay. Um, this requisition was not uh [17:23] shared with the committee in advance [17:25] because it came in late [17:27] » And therefore [17:29] being an item uh pay item [17:33] um and it's special meeting, [17:36] we need a motion here to allow the [17:40] submittal of this invoice uh for review [17:43] and possible approval. [17:46] » So moved by Mr. Burman, second by [17:50] Patrick. [17:51] » Discussion. [17:53] Uh, all in favor of approving the [17:56] motion, please say I. [17:57] » I. [18:00] » And any nays? [18:03] Chair votes I. And that did require [18:05] two/3 which we have. So that motion [18:08] passes. And now you may proceed. [18:11] » Right. I don't [18:13] » Let me go into [18:14] » We're going to do the same thing with [18:15] the McMahon anyway. [18:16] » Right. I don't know nothing about [18:17] McMahon just prove [18:21] » All righty. June 2026 requisition has [18:24] been revised. Uh the last meeting that [18:26] we had it got tabled the MJ daily costs [18:30] in their final final billing as well as [18:32] their retainage. We have since then [18:34] pulled out the the MJ daily billing. We [18:37] have pulled out their retainage billing [18:39] request. So this June requisition in [18:42] summary here um is going to be for the [18:46] contractors that I'll talk about in a [18:48] second. But Maniffort right we have the [18:50] plaza issue with the course and that [18:53] issue being taken care of right now with [18:55] the analyticals and the data on that. [18:58] But we did process Maniffort retainage a [19:01] while back before the concrete plaza [19:03] became an issue back in January of 2026. [19:06] Um of 117,7332.37 [19:12] has been paid that we are holding the [19:15] money um on on Maniffort until we get [19:18] and figure out what's going happen at [19:20] this plaza. Okay. So that money is the [19:23] remaining payment to our subcontractor. [19:25] » What was that figure again? $17,732.37. [19:32] » Yep. Current remaining retainage to be [19:35] build. The only subcontractor left that [19:37] we have current billings to do and [19:39] retainage that has to be built still is [19:41] MJ Daily of $157,766.93. [19:48] This is pending the carrier issues. So, [19:50] no processing of the retainage is going [19:53] to be on this June 2026 requisition. [19:57] Once approved, if approved, the June [20:00] 2026 requisition has repa retainage [20:03] billings and release of payment to AEG, [20:06] who is a Tyler flooring contractor, and [20:08] AEG, who is our resilient flooring [20:12] contractor. Uh we have two two retainage [20:15] release uh amounts there. Uh once this [20:17] requisition does get approved by the [20:19] committee tonight, those will be [20:20] released to AEG as there are no no punch [20:23] list or no warranty issues with them [20:25] currently. [20:27] So tonight we are looking for this [20:30] requisition in amount of $55,866.72 [20:35] cents to [20:37] » So moved [20:39] » By Mr. Ike. [20:40] » We have a second [20:42] by Mr. Berman. Um, I'd also like to note [20:45] that um in addition to theund [20:49] approximately 158,000 being retained uh [20:53] on MJ Daly's contract, there is another [20:57] $24,916 [21:00] plus a $9,000 change order on top of [21:02] that of money being held [21:03] » Which is which is not being which is [21:06] still yet to be paid. [21:07] » Correct. So in essence, you have about [21:09] $185 $190,000 [21:13] till they finish. [21:14] » I just have a question. How you get to [21:15] the $55,000 total for that? [21:18] » The $55,000 is the billings on this [21:21] period, right? [21:22] » Uhhuh. [21:25] » All the way here at the bottom plus the [21:27] retainage release that was on the A2 [21:29] contract. So it only shows up on the [21:31] cover page because the retainage [21:33] deduction goes down and it goes into the [21:35] current payment, too. See? Yep. [21:40] Other questions, [21:42] comments? [21:46] All right. All in favor of a motion to [21:47] approve uh application and ser [21:50] certificate for payment number 35 in the [21:53] amount of $55,866.7. [21:58] Please say I. [21:59] » I. [22:00] » I. [22:01] » I. [22:03] M. [22:06] passes. Thank you, Anthony, for that. [22:10] What else you got? [22:11] » Let's keep swimming here. Budget and [22:12] pending PCOS. We currently have none. I [22:16] just want to go quicker only uh synopsis [22:20] here of of the budget where we came in [22:23] with our GMP all the approved change [22:25] orders 1 through 29 to date with our GMP [22:28] costs here. You'll see that there are no [22:30] penny budget changes currently [22:33] in the block. And the total amount is [22:35] 28,271,584.25. [22:40] And then you get into your CM uh CM [22:43] contingency of what we have. We have our [22:45] expenditures approved PCOS uh with a [22:48] remaining contingency balance of $93,359 [22:54] uh with the projected balance coming [22:55] back of $93,359. [22:58] And that that is checks and balances. If [23:01] you want to look back at the [23:02] requisition, right, with all the [23:04] expenditures to date, we don't have any [23:06] pending ones. You see here, $93,35 [23:10] $359 [23:13] and that was all previous PCOS change [23:16] orders. A big chunk of that was when we [23:17] had the whole soils issue on the Riley [23:19] lot that we had removed. Um, but again, [23:22] here we are and uh this is what coming [23:25] back. [23:26] » Okay, question is for Anthony. You sent [23:28] me that or did you already? I can send [23:30] you to this. No problem. [23:33] And the last one here, official PCOS and [23:35] looking for committee approval tonight [23:36] is nothing. [23:40] » Good item. [23:41] » The first. [23:42] » That's a first. Maybe from the first [23:44] meeting we originally had 100 meetings [23:47] ago. [23:48] » That's the light at the end of the [23:49] tunnel right there. [23:50] » Right there. [23:53] questions for [23:54] » Concrete update about the plaza where we [23:57] » Yeah, right here we have a proposal uh [23:59] the concrete plaza coring has been [24:01] submitted. There was a 6 to8 week lead [24:03] time on that. So, we're waiting to get [24:04] those analyticals back sometime in [24:06] midepptember. [24:07] » We mid September. [24:08] » Another middle week. We are [24:12] » Not the middle [24:14] midsepptember would be anything middle [24:16] of next week on [24:18] » Yep. We're close. We're pushing pushing. [24:23] » All right. [24:25] We have anything else for Anthony on [24:26] pro? [24:31] » No. Uh there any chance there might be [24:34] any more age orders for proer? [24:38] » I don't see it at this point in time. If [24:40] there's a few handled back charges, you [24:42] get it doesn't wouldn't matter. Uh it [24:44] would be zero cost. Um but other than [24:46] that, there's there's no pending ones at [24:48] this point in time. [24:50] » Unless the AV solution doesn't work. [24:52] » Unless the AV solution does not work. [24:55] We're holding out $40,000 for that [24:58] potential [25:00] or round three of that. Hopefully not. [25:04] » Rely on our our design team for that and [25:06] the engineering involved with that. Um I [25:08] know RZ had the cut sheets, all the EV [25:10] equipment in that space. Um what kind of [25:13] heat it produces. So hopefully this this [25:16] this solution goes goes through [25:18] correctly. [25:20] » Okay. So that present on and that [25:23] $93,000 [25:25] gets released from construction [25:28] contingency over owner's contingency [25:33] » Right now. That means our owners [25:34] contingency is in a minus category. [25:40] » All I know is that the $93,000 [25:43] has been taken into consideration in our [25:46] overall pick. [25:47] » Right. I understand. [25:48] » Right. [25:50] Because theoretically [25:52] we have $84,000 [25:56] available to us. It's not committed [25:59] » Theoretic [26:00] » Inclusive of that [26:02] » Right 93. Yes. Yes. [26:04] » Which means that we have we're sitting [26:06] on a minus 9,000 under contingency [26:10] because 93 is over there [26:12] » If you carve out procer. [26:15] » Right. [26:15] » Correct. Correct. But but we're looking [26:18] at both Understand? [26:19] » Yes. Yes. [26:20] » My point is just to clarify not only [26:24] just for myself but for anybody what [26:27] that 93,000 really means. Isn't extra [26:31] money sitting there. [26:34] It's already basically accounted for. [26:36] » Some of it. [26:37] » Yeah. [26:37] » Some of it is [26:38] » Some of it's basically accounted for. [26:39] » Well, I just want to make sure that's [26:42] clear to everybody [26:43] » In the completion of of McMahon [26:45] Winenberry. Yes. [26:47] because everything's in basically one [26:49] piece in [26:50] » Correct in that sense [26:54] else proper. [26:58] Okay, thank you Anthony [27:03] disappointed. All right, let's go [27:05] to your buddies. Uh we got Johnny DS is [27:08] here. Scott's here. [27:11] » Good evening everyone. How are you? [27:14] » Screen. [27:17] » All righty. I apologize. I'm not there [27:19] in person. I'm actually covering a [27:21] second shift at the school in Norwich [27:23] for some punch list work. So, [27:27] um I'll go down our project update. Um [27:30] sidewalk activities made some progress [27:32] throughout the month of August with [27:33] subtle significant exterior construction [27:35] milestones achieved. Um the biggest [27:38] being the parking lot um has been [27:40] completed. [27:42] Um they have completed my other has [27:45] completed 100% of the project's planned [27:47] concrete work which includes the pergola [27:49] which has been which was approved last [27:51] building committee meeting. Um further [27:53] on the agenda we have that um price on [27:57] the change order tied up based on some [27:59] tickets TNM tickets. [28:02] Current site work activities focus on [28:04] the preparation of the of the remaining [28:07] landscape and specialty paving [28:08] improvements. um most noticeably the [28:11] porest pavement uh at the children's [28:14] garden area. Work is underway in uh [28:17] preparation for that subgrade and as [28:19] they subgrade in the stone base for that [28:21] area. Um proper prep preparation for [28:25] underlying subgrade and stone base is [28:27] necessary is necessary to support that [28:29] porest pavement and its drainage [28:31] performance. So that is what's going on [28:33] at the moment. Um with they're also [28:36] working on the grading at the rain chain [28:38] system. the bowl um that's going to be [28:42] off the roof uh the way the the storm [28:46] drainage collects the water through a [28:48] special rain chain system. [28:51] Uh site work activities continue um [28:54] throughout September and include that [28:55] porous pavement, the completion of the [28:57] landscaping and the final pavement line [29:01] striping. [29:03] Um I want to note that RTOR and Sean has [29:05] been to the site and they provided a [29:07] field report. Um, one of those uh field [29:11] reports, the biggest one had a [29:12] deficiency with the curbing um is [29:15] currently being reviewed with Mather on [29:16] a uh to provide an acceptable fix. The [29:20] timeline of that it is to be uh is to be [29:24] determined in beginning of next week uh [29:27] given it's acceptable. [29:30] Um any questions on anything regarding [29:34] the update? That's the same one that you [29:37] sent me via email, right? [29:39] » Yes. Yes, sir. [29:41] » Question is for Johnny. Have one [29:44] Patrick. [29:44] » Thank you, Mr. Chair. I just Johnny, [29:46] this may be actually a question for [29:48] Jeff. I think we had talked about uh [29:51] painting [29:52] along the roof line on the outside of [29:55] the building to make it more [29:57] um he was going to investigate. [30:00] » Oh, okay. So, so there's no update [30:02] really on that. [30:03] » No, I got to pick the color. So, I'm [30:05] going to I'll drive over there and and [30:07] take some good photos when the light's [30:09] good and just figure out uh which color [30:12] would be nice to do. Um, also, one quick [30:16] thing is that I've calculated with rock [30:18] the uh amount of water that's coming off [30:20] those folder roofs, which is how we size [30:22] the scupper. And I'm looking at a [30:25] funnel-shaped rain chain um that will [30:29] have an opening, a little wide opening [30:31] so we don't have water splashing around [30:33] just a normal chain and then that'll run [30:35] the heat trace in it too. So I'm getting [30:37] close to picking one. Um and then [30:40] sharing it with everybody. Uh we'll get [30:42] Matt's input on it and Glenn's input. [30:45] So, the idea, the goal here is to do [30:46] something that looks beautiful [30:47] aesthetically that's going to tie into [30:49] the children's garden, but also, you [30:51] know, which will be a sculptural kind of [30:53] element, but also uh be uh have a have a [30:57] top cone that's wide enough to capture [31:00] any heavy rain that might be coming down [31:02] there. I know that my opening is about [31:04] three three and a half inches at the end [31:06] of this cuper. So, I'm working on [31:07] getting something that's four four and a [31:09] half at the top so that we can contain [31:12] the water as a sculpture element and not [31:14] have it splash all over the place. So, [31:15] I'm working on that as well. So, those [31:17] are two things that I got to I got to [31:19] do. I'm working on [31:21] » And I think I think with that color up [31:22] there, I think it will just completely [31:24] transform the the library. I mean, we're [31:26] already close with the canopies and the [31:28] children garden, everything, all the new [31:29] work that we're going, but once we do [31:31] that, I think that it'll really pump it [31:33] really look good for the community. So, [31:37] Thank you John also that rain chain has [31:40] not been accounted for in any type of a [31:44] uh public works is providing the plane [31:48] » They're paying for it as far as I know [31:51] by others we'll we'll discuss has a [31:54] funny look on his [31:56] let's see what let's see what Jeff picks [31:58] for us and then we'll [32:00] » Yeah I'll I'll work with Matt and Glenn [32:02] on that too because I know they have [32:04] options of stainless and aluminum Um, [32:05] and LUIM is non-corrosive and it's [32:07] probably less expensive. So, um, and it [32:10] might even pull nicer into the the color [32:12] of the canopy. So, I'm I'm looking at [32:15] all options. So, don't be alarmed. I'm [32:17] not going to pick a million dollar rain [32:18] chain. So, [32:21] » There may be one [32:22] » Donated by TSKP. [32:25] » Actually, actually, it' be nice to just [32:27] have somebody fabricate that thing if [32:29] they can work in stainless. It' be TIG [32:30] welding. So, it' be nice to do some have [32:32] an artist do something really cool. [32:34] Anyway, [32:36] » Right. Other questions for Johnny. Uh, [32:38] Mr. Burman, and then we'll go to Matt. [32:39] » Thank you, Chair. Uh, Johnny, what's the [32:42] problem with the curbing? [32:44] » So, the issue with the curbing is at the [32:46] end of the transition where the curbing [32:50] dies down and transitions into the [32:53] adjacent material. In this case, it's a [32:55] sidewalk. In this case, it's the [32:56] remaining of a different type of system. [32:59] Um, the issue was that [33:02] Mather didn't provide a 3-FFT transition [33:05] piece. As you see here, it's not sloped, [33:08] and they they caught it a little too [33:09] late where the concrete curving had um [33:13] had gotten too cool, so it couldn't be [33:15] as easily uh maneuverable. So, um that's [33:20] that's the issue at the moment. It's [33:21] it's not um uh it's not acceptable at [33:26] the moment. [33:27] » Okay. Thank you. [33:29] an error on the contractor's part. [33:32] » Yes. [33:33] » Should be no cost to us. [33:35] » Correct. Matt, [33:36] » I just was wondering, Johnny, do you [33:38] have any updates on the boulders? I know [33:40] I've been working with Jason this week [33:42] on the boulders. And [33:44] » Um I know that Jason said that he was in [33:48] uh possession of a couple boulders, more [33:51] specifically the smaller types. I think [33:53] it was type one through three. Um and [33:55] he's in contact with Gary um with RTOR [33:58] and Segan to see if those are [33:59] acceptable. [34:00] » Okay. [34:00] » Um that's where we're at the moment. [34:02] There was correspondence back and forth [34:04] today between the two of them to try to [34:06] come to a resolution of the boulders [34:07] that they had are acceptable. [34:09] » Um and I think where we left it is that [34:12] Gary wants to see the boulders um in [34:14] person rather than a photo. [34:16] » Okay. Thank you. [34:19] » Uh Glenn, you still have your hand up? [34:21] » Uh no. I had the same question as Matt [34:23] did about the boulders. [34:25] » I'll I'll have um I'll have Jason reach [34:28] out to you, Matt, tomorrow. I I [34:31] » Yeah, he'll reach out to you guys [34:32] tomorrow. I know that he's kind of [34:34] spearheading an alternate, smaller, more [34:38] maneuverable boulder. [34:41] » Anything else, Elizabeth? I just wanted [34:43] to second the need to have those [34:46] boulders be more symmetric and smaller [34:49] in line with the original design of the [34:52] children's reading garden. So, I'm I'm [34:54] glad to hear that we're looking at that [34:57] and I hope that the committee can follow [34:59] that conversation and if needed um help [35:04] make that happen immediately. [35:08] » Okay. [35:10] So, does that mean the Phil the boulders [35:12] that were at Philly Park are not [35:14] acceptable? They're too big. Oh, okay. [35:16] So, I missed that part in between them. [35:19] I [35:19] » Really didn't know till this week. We we [35:21] relocated them all over there. Yeah. [35:23] » But then when the architect, I guess, [35:26] saw them, [35:27] » Suddenly decided they're not going to [35:28] fit. [35:29] » Okay. Okay. So, I thought he had [35:31] » They reached their final destination. [35:33] Now, they can find a home somewhere on [35:34] the property at this point. [35:36] » He measured them. He went there and [35:37] actually grown on the way over. [35:40] » Yeah. [35:42] » Older farm somewhere. He would not have [35:44] » Like Glenn said, we're not moving them [35:46] again. We moved them there. So [35:49] » Okay. Well, thank you. I [35:51] » Have a tag sale. That's right. [35:54] » You move it. [35:55] » Okay. [35:56] » Uh other questions for Johnny. [36:00] » Right. Johnny, you [36:02] » Thank you. Uh we'll continue into the [36:04] requisition in the PCO section. Um first [36:08] up is the requisition. Uh I apologize [36:11] for not getting it to the committee [36:13] earlier, but we do have a printed copy I [36:15] believe on the table. Um Mark, we're [36:19] looking to approve I believe [36:21] $287,897.50. [36:28] Joe, [36:28] » We're okay on this one. [36:29] » Well, my question is is [36:33] We're not paying downs to 287, right? [36:36] We're paying to [36:38] Mather. We have the town has a contract, [36:41] correct, [36:42] » With Mather, [36:43] » Right, [36:43] » For this. So, [36:46] Mather's submitting an invoic. I don't [36:47] want things getting paid twice. [36:50] » Joe, uh, Downs didn't submit an invoice [36:53] for this committee meeting. We did that [36:55] last meeting. Um, this is strictly for [36:56] Mather Corporation, who has yet to [36:59] submit an invoice for this entire [37:00] project yet. [37:02] um they had some scheduled value issues [37:04] that had to be worked through and it [37:06] took some time on their part. So they [37:08] finally got through it and through the [37:10] review of their billing and this is [37:12] their very first billing. [37:14] » Okay. So this is being paid to Nather, [37:18] not to Downs. [37:19] » Correct. We're just facilitating the [37:21] invoice to you. Um the payment does not [37:23] go to Downs for us to pay them. We don't [37:26] have a contract with them. We're just [37:28] simply uh facilitating as we've been [37:30] asked to. [37:35] » Yeah. So, this is permitted and uh we [37:38] don't need any special motion on this [37:40] submitted. Submit. Okay. We're good. [37:43] » All right. Uh do we have a motion to [37:45] approve this uh application number one? [37:48] » Move. [37:50] » Moved Mr. Burman. [37:52] » Moved by Mr. Burman. Second by [37:56] » Second [37:56] » Patrick. Thank you. All right. Uh [37:59] discussion and questions. [38:07] Hearing none. Uh all in favor of [38:09] approving application and certificate [38:11] for claim for uh Mic corporation [38:15] application number one in the amount of [38:16] $287,89750. [38:21] Please say I. I [38:24] » Naining [38:27] motion passes [38:29] right. Thank you for that. What else? [38:32] » Thank you. [38:34] » Um we do have some budgeted PCOS I'd [38:37] like to go through first. Um first is [38:39] PCO number six which has to do with [38:42] flattening the front lawn soil. Um we [38:45] did receive a TNN ticket from Mather. Um [38:47] that we are just awaiting a PCO from [38:49] them with a cost associated to the work [38:52] applied. [38:53] Um PCO number eight and next one is a [38:56] test pit of yard drain number five. The [38:59] amount of $300 was requested and uh [39:03] that's the budget for that. [39:06] And we had PCO number nine irrigation [39:09] sleeves installed for future use. Um, [39:12] this was a request from the DPW, I [39:14] believe, to install irrigation sleeves [39:16] underneath the parking lot for uh for [39:19] the intended use of in the future. Um, [39:22] that's showing a budgeted amount, excuse [39:25] me, of $1,000. So, we have PCO 6, 8, and [39:29] 9 shown as in front of you. [39:34] » We'll hear again from from from you on [39:36] those when we get firm uh [39:38] » Firm numbers. We aren't going to pay for [39:42] flattening the front lawn [39:44] before we do an irrigation system, are [39:48] we? Or how's that going to work? [39:49] » Well, they they had to flatten it, so we [39:52] can't move. [39:52] » Okay. That was I just didn't want it be [39:54] torn up twice. [39:55] » I know. [39:57] » Correct. Okay. I'll move on to official [40:00] PCOS if that's okay. [40:02] » Yep. [40:02] » Okay. Official PCO. Um last um committee [40:07] meeting we approved a not to exceed [40:09] number of uh $12,000. Um since then [40:15] Mather has provided a [40:18] uh cost based on their labor and they [40:20] have added a TNM ticket. Um the cost [40:23] that we are looking to approve um and to [40:26] amend PCO number seven from before the [40:29] final hard price is $11,4346 [40:38] and we have a motion to approve that. [40:40] » I move approve the number seven amount [40:43] of 11,4346 [40:47] » By Mr. Burman seconded by [40:52] second Patrick. [40:53] » Thank you very much. [40:55] » Questions, comments? Lois [40:57] » Taxes removed. [40:59] » Tax is removed. Deb. Yes, please. [41:02] » And the description of the project. [41:05] Last time we talked about needing to do [41:07] this now before the perky pave was laid [41:12] so that we didn't have to dig it up and [41:14] do it later. There is a statement in the [41:17] uh description of this on the on the for [41:21] the CPO that says this work will require [41:25] excavation through the completed perky [41:28] pave markup errors that have already [41:31] been installed. [41:33] So now I'm confused. [41:36] It's not I don't believe that's the [41:38] actual perky pave. I believe that's the [41:40] m mark area that they were laying base [41:43] for. No, I I believe that they're going [41:45] to pour, correct me if I'm wrong, [41:46] everybody, but I believe they were going [41:48] to pour I think a 2 inch or less just [41:50] over the top of those [41:52] » Foundations, but I think they ended up [41:54] pouring them a little bit tall according [41:55] to Gary, which is fine. So that would [41:57] just mean um the anchoring of the [42:00] pergola would uh go through the perk [42:03] down to the foundations. So whether [42:06] that's a circle that's cut out for them [42:08] to do the attachments and um expose the [42:12] uh circle of the foundations um or [42:15] replace it with that perky pave section. [42:17] Um but there is a whole procedure to do [42:19] that. So I mean that's my understanding. [42:21] I mean that's pretty much sequence wise [42:23] that's the only way we can really do it. [42:25] So we wanted to get that perky pave over [42:27] everything um so that when the future [42:29] pergola comes then we can actually just [42:32] attach it to uh the footings and [42:35] foundations. [42:37] » So so that statement Lois is what's [42:39] coming in the future. [42:40] » Yeah. [42:41] » When installed [42:44] » Uh a circle have to be cut out above [42:47] each one of these. [42:48] » Yeah. So the confusing thing here is and [42:49] I agree with Lois the word excavation. [42:52] There's not going to be any excavation. [42:54] So it's basically localized uh [42:56] connection to the pergola. [42:59] » Thank you. [43:01] » Other questions? [43:06] » Right. All in favor of the uh Mather [43:10] Corp uh cost for the [43:15] Corta Foundations and the amount of we [43:17] have that amount again 11,446 [43:21] or 346 cents. Please say I. [43:24] » I. [43:25] » I. [43:26] » I. [43:26] » Any nays? [43:29] Anybody abstaining? [43:32] Passes. [43:33] » Thank you. [43:34] » Thank you. Um All right. I got some [43:36] photos here at the end of my agenda. I'd [43:38] like to share. Um the maintenance strip [43:41] here shown around the uh this is the [43:44] south um elevation. [43:47] Um, we got the concrete uh, excuse me, [43:51] the uh, parking lot pavement here. See [43:55] the uh, the buminous curb as well. [44:00] Another photo of the maintenance strip. [44:04] Here's a nice photo of the pavement. [44:08] Another photo of the pavement. This is [44:10] for the future dumpster pad location. [44:13] Dumpster location. [44:16] And that was it. 77. [44:20] Thank you everyone. [44:23] » Any last questions for John? [44:25] » It's such an extreme difference for [44:27] anybody who drives by what and what is [44:30] now. Like looks so much cleaner. [44:34] » Great. [44:36] Okay. Thank you, Johnny. Thank you, [44:38] Scott. [44:40] » Let's go to uh our architect, Jeff. Got [44:44] anything for us tonight? Uh, other than [44:47] reviewing RFIs and submitts as they come [44:49] in, I know I got to pick the color for [44:52] the upper part of McMahon Library. Um, [44:56] and the rain chain. So, that's basically [45:02] on my hot list to do like everything [45:04] else. Gary's been out there to do his [45:06] field reports, so he's catching things [45:09] as I go. So, so far I think um between [45:13] DS and Gary checking things over and [45:15] making sure they're doing things right, [45:16] I think we're in good shape. [45:19] » Great questions for Jeff. [45:23] » All right. Thanks, Jeff. [45:26] » All right. Uh purchasing [45:29] Joe, you got something else before we do [45:30] that. I think you had a couple of [45:34] proposals. [45:35] » I did. I had the uh proposal for the [45:38] irrigation. Ah, [45:40] » I can hear that. That's coming. [45:42] » Yes, that was uh sent out. [46:04] There's the first one. [46:09] » So, this is for the irrigation work. Uh, [46:12] I did receive three quotes. They were [46:14] obviously the cheapest. $12,111. [46:19] It includes nine zones. uh be 67 heads I [46:23] believe total. [46:25] Um [46:28] so looking for [46:32] we have a motion to approve. [46:33] » So moved [46:34] » By Mr. I second [46:37] » By Mr. Burman. Questions? [46:41] » There's tax in here. [46:47] 723 [46:49] » Uh tax. [46:51] » No problem. [46:53] » I'll be sure they've [46:57] » 112 [47:01] » 23 [47:03] » $11,388. [47:07] » Thank you. Thank you, Clark. Is that [47:12] Patrick? [47:13] » So, where do we have this in our budget? [47:16] Was this part of it? [47:18] » Uh, no sir. We were going to gather that [47:20] during the project. We we left it out. [47:22] We planned for it. You know, we put the [47:24] sleeves in and did everything. We we [47:27] said we would, you know, reach out. [47:29] Mathers didn't want it. They didn't have [47:31] anybody. We tried to go through them, [47:33] but they didn't have anybody that would [47:34] do it. [47:35] » So then we reached out on our own to get [47:38] three quotes. And [47:39] » So is this coming out of our [47:40] contingency? [47:41] » This would come out of our contingency. [47:42] Okay. I mean I I have asked Joe um to as [47:47] he's been doing to you know keep us on [47:50] track with our remaining. So [47:55] » This is the first thing as far as I know [47:56] though that's come out kind of [47:58] » Oh no the um the foundation [48:00] » The foundation and uh and then those we [48:03] have three PCOS that [48:06] » That are coming yeah but right now [48:09] » Ones that as far as approval it's so [48:11] we're looking at like maybe 24,000 [48:15] » Out of our right [48:18] » Okay my question thank you [48:22] » All All right. All in favor of approving [48:24] the Fornier irrigation [48:27] uh proposal in the amount the revised [48:29] amount 11,38 [48:33] say I [48:34] » I [48:35] » I [48:36] » I. [48:38] » Anybody abstaining? Motion passes. [48:44] What else? Got [48:46] » One more [48:48] electrical. Yes, sir. [48:52] This next one you see is for the book [48:55] locker that was purchased for Winbury. [48:59] We have to have an additional outlet put [49:01] outside along with an Ethernet drop or [49:05] drop to obviously work to function. So [49:08] again this was not in the scope of work [49:11] for matters. So we reached out to get an [49:14] electrician to do it. [49:18] I [49:18] » I move approval of [49:21] Uh, who is it? [49:23] » Online. [49:24] » Online about $1,75. [49:30] » 1,875. [49:32] » 875. Hard to read from that. [49:34] » Yeah. [49:35] » 96 cents. [49:36] » Same. [49:37] » All right. Moved by Mr. Burman. A [49:39] second. [49:40] » Second. [49:41] » Second by Patrick. Thank you. [49:43] » Questions or comments? [49:45] » No one knows what that's for based on [49:48] this. So it would be nice if the motion [49:51] could include what it was for [49:54] » Outlet and internet connection. [49:56] » The book drop [49:57] » For the book drop [50:00] with that Mr. Secer. [50:02] » Yes, I am good with the amendment. Thank [50:03] you. [50:04] » Thank you. [50:05] » Other questions? [50:06] » No tax on here. I don't see any [50:08] » No tax. [50:11] Uh all in favor of uh the proposal from [50:15] an LAN electric uh for the amount of [50:17] $1875.96, [50:20] please say I. [50:21] » I. [50:22] » I. [50:23] Naz. Anybody abstaining? [50:27] Motion passes. Thank you. [50:31] » And Matt and Joe, now you got bills, [50:36] right? You got [50:38] invoice. [50:47] Okay, [50:52] our first one is for ESKP [50:58] or services rendered on BRSER [51:03] through July 31st [51:07] and that's in the amount of 2,00 [51:10] 574. [51:13] » So moved. [51:14] » Moved by Mr. Taylor I second. [51:16] » Second by Mr. Burman. This is the uh [51:19] change that we approved for the um [51:23] landscape ar civil engineer to complete [51:26] the additional um tobo and drainage [51:29] calculations that the town had asked [51:30] for. [51:32] That's what this is. Um [51:36] questions. [51:38] All right. All in favor motion to [51:40] approve TSKP studio invoice [51:43] » In the amount of $2574. [51:47] » Please say [51:48] » I [51:53] obstaining motion passes. Thank you. [51:57] » Last one. [52:02] » Next one is also TSKP. [52:06] Um, this is for services for McMahon [52:12] for [52:14] the month through July 31st [52:18] in the amount of $4,1264. [52:23] » So moved [52:24] » By Mr. Ike [52:26] » By Mr. Burman. [52:28] Questions? [52:32] All right. All in favor of TSKP Studio [52:35] invoice in the amount of $4,1264, [52:39] please say I. [52:40] » I [52:45] abstaining motion passes. Thank you. [52:49] » Got one. [52:50] » And the last one that I have also from [52:54] DSKP [52:59] is for professional services through [53:01] August. [53:02] 31st [53:05] board of man in the amount of $4,085. [53:11] » So moved [53:13] » By Mr. Ike second by Mr. Burman [53:17] questions. [53:21] All right. All in favor of TSK pay [53:23] invoice in the amount of $4,085, [53:26] please say I. I [53:30] named [53:32] We stand [53:34] pass. All right. [53:37] Thank you for that. That is all that is [53:41] all I have. [53:43] » Thanks. [53:43] » Uh other items from the committee, Mr. [53:45] Bur. [53:46] » I have two questions that I don't know [53:48] if anybody answers to. Number one, where [53:51] do we stand on the lead certification? [53:54] Number two, where do we stand on the [53:56] solar [53:57] power? [53:59] » Okay, lead. Uh, Anthony, can you help [54:01] me? [54:02] » Now, I know Cynthia's uploaded it to [54:04] lead online and it's going through the [54:05] the review process there. I'll find [54:08] » I know she was waiting on some [54:10] information from the engineers um the [54:13] electric engineers, but I that was a [54:15] while ago. So, I don't know if there's [54:16] any [54:17] » Morphed into uh working with SLR on the [54:20] rain uh the rainwater. Um I think we're [54:24] past that. So, I think it's submitted [54:26] fully to lead online, but I'll double [54:28] check with Cynthia, and we'll get the [54:30] facts straight and making sure we get [54:32] the team updated here on what's [54:34] » Okay. Yeah, I think you're right, [54:35] Anthony. [54:36] » Okay, good. [54:38] » And Joe, you have anything further [54:40] around our solar panels? [54:42] » Yeah. Uh Glenn can correct me if I'm [54:44] wrong too, but I believe there we have a [54:46] kickoff meeting I think in a couple [54:48] weeks or next week maybe for the solar [54:51] at Proser, but I don't think [54:53] construction will start till next year. [54:55] That's correct. [54:57] » Next year when? [54:58] » Yeah. And Proser, while we're talking [55:00] about the solar, I wanted to make sure [55:02] that the initial roof inspection, all [55:05] the deficiency items that were found by [55:07] the solar installer were in fact [55:09] prepared by Silk Town and were ready to [55:11] go. Yeah, I'll follow up with that. Uh, [55:14] Glenn, I'll see where they are. [55:16] » Okay, I appreciate that. [55:19] » Now, correct me if I'm wrong, Anthony. [55:20] Is this a ballasted system? [55:23] » It is. [55:23] » It is. Okay. So I think that yeah I [55:26] think agree with what Glenn's saying [55:28] because there's anything penetrating the [55:29] roof typically what we'll do to not void [55:31] the warranty is we'll have to get a [55:32] letter from the roofing manufacturer to [55:33] make sure that any boot or any patch or [55:36] anything that we do for that system if [55:38] it's dunage that is anchored directly to [55:40] the structure needs to be you know [55:43] signed off on. But as long as it's all [55:44] ballasted, which is basically the the [55:46] weights on the roof with the pads, I [55:48] think I think you'll be good. But I [55:49] agree with Glenn and make sure that [55:52] » Let me double check, Glenn, because that [55:53] was sent to wild to Silk Town a while [55:55] back. [55:56] » All right. I appreciate it. [55:57] » No problem. [56:00] » Next year. [56:02] » Do we know next year when? [56:04] » No. [56:05] » Yeah, I should know more when we have [56:06] that kickoff meeting to describe it. [56:09] Initially, I I believe the completion [56:11] date was going to be September 27. [56:14] » Yes, I believe [56:14] » Of 2027 [56:17] » Originally. [56:18] » Originally, [56:20] in other words, Elizabeth, plan for a [56:23] minimum of half a year before you have [56:25] any solar. [56:29] » All right. Other items from the [56:31] committee? [56:32] » Mr. Chair, [56:33] » Patrick Lis, did you have yours first? [56:36] Sure. [56:36] » I just wondered what's happening about [56:37] the garage. Seems to me it's been closed [56:40] for quite a long time now. [56:42] » Yes, ma'am. Currently, we're just [56:44] waiting on the sprinkler heads, the [56:46] drops. They had to order them. The [56:48] ceiling's all done. That's the only [56:50] thing left is installed. There's 12 [56:52] drops that have to be installed, the [56:54] sprinkler heads. So, they had to order [56:56] special lengths [56:58] » And we can't use it in the meantime. [57:00] » I've reached out to the fire marshall [57:02] and the building official. They won't [57:04] let us use it with it shut down. [57:06] » Thank you. Did they catch the guy? [57:09] » They did. [57:10] » They actually have an arrest warrant for [57:12] him as we speak. [57:13] » Wow. [57:15] » Is he going to pay for it? [57:16] » He is. Or his insurance company is. [57:20] » Good. [57:24] » All right. [57:25] » Oh, thank you, Mr. Chair. So, last night [57:28] I was wearing my board of trustees hat [57:32] um and we had some discussion, you know, [57:34] as the project is nearing its end. There [57:36] was some discussion about the acceptance [57:38] of the building by the board of [57:39] trustees. [57:41] And so I was hoping that we could get [57:44] some clarification on exactly what this [57:46] means. Like what are the roles and [57:48] responsibilities of the board of [57:49] trustees in acceptance of this building [57:52] when it's complete as it relates to the [57:55] charge that was given to the LBC by the [57:58] then mayor? [58:00] Um I have yes I have been carrying [58:03] around our charge because it's and I was [58:06] hoping to present this uh soon to the to [58:10] the committee so we're all aware of what [58:11] needs to happen at the end because like [58:13] I said we can see that [58:14] » See the light at the end. So, um I'm [58:17] going to read from our charge um [58:20] uh that says after construction has been [58:23] completed to the satisfaction of the [58:26] building committee and the proer public [58:29] library board of directors has been [58:32] asked for its comments, the building [58:35] committee shall refer the facility to [58:37] the town council for acceptance with a [58:41] report on the status of the facility [58:44] including the comments of the crosser [58:46] public library board of directors [58:49] together with warranties and blah blah [58:51] blah all that stuff which has actually [58:53] already been submitted to public works [58:55] and town officials. But uh so that [58:57] describes the relationship. Um, so when [59:00] the building committee believes we're [59:03] ready to accept the building, then uh my [59:07] plan is to attend a board of trustees [59:10] meeting and view that and elicit [59:13] comments to go with our presentation [59:17] through town council. [59:19] » That's how all that would happen. That [59:21] helps clarify because I for one was not [59:24] really understanding what our role was [59:27] as a board of trustees in accepting the [59:30] building. So really the only role that [59:33] the board of trustees would have is to [59:36] provide comment back to the LCB which [59:40] would then be taken in cons taken into [59:44] consideration go to town council. [59:47] » Right. And it's up to council to accept, [59:50] right? Or say, "Oh, we're not ready to [59:52] accept." [59:53] » Right? So, it's not up to the board of [59:55] trustees to accept or not accept the [59:58] building upon turnover. We provide [1:00:01] comment, [1:00:02] » Right? And you're you're free the board [1:00:04] of trustees is free to comment however [1:00:06] the board would like. [1:00:07] » Would like to, right? Okay. That [1:00:09] definitely helps because there was, you [1:00:10] know, we were discussing some of this [1:00:12] last night. [1:00:14] I wasn't clear myself on what the charge [1:00:17] really said. So, so thank you. [1:00:20] » Well, thank you for that. Thank you for [1:00:21] that clearing around that charge. [1:00:25] » I know. I should look up my copy of it. [1:00:27] » Lois, [1:00:28] » I would think that since the board of [1:00:30] trustees has been heavily involved in [1:00:33] all of the meetings that their comments, [1:00:36] we wouldn't expect their comments to be [1:00:39] surprising. [1:00:42] That's a nice thought. Thank you. [1:00:49] » They are free to make comments. They're [1:00:51] » We do communicate effectively all of the [1:00:54] things that [1:00:55] » Is going on that we are concerned about [1:00:57] that we are watching that we hope to be [1:01:00] completed. All of those the the library [1:01:02] board of trustees is involved in all of [1:01:03] that. [1:01:04] » Absolutely. I concur. And many of the [1:01:07] items we discussed tonight were all [1:01:09] discussed last night. [1:01:13] Um, I had a comment and that was uh [1:01:17] maybe it's up to Scott. Scott, are you [1:01:20] going to present um [1:01:22] the uh proposal for an extended warranty [1:01:25] at Proser? [1:01:29] » Yeah. Not tonight though. [1:01:32] » Not tonight. [1:01:32] » Nope. [1:01:33] » All right. I know DS has been working [1:01:36] with MJ Daily on um [1:01:39] uh an extended warranty [1:01:42] on uh all of their work and I my [1:01:45] understanding is the the talks have been [1:01:47] extremely successful. Um I guess there's [1:01:50] still something to wrap up that true. [1:01:53] » Yes, that's correct. [1:01:56] » Next meeting. [1:01:58] » All right. Other items for the calendar, [1:02:01] » Mr. Bur. Thank you. For our next [1:02:03] meeting, would it be at all possible to [1:02:05] have financial reports and where we [1:02:09] stand in terms of [1:02:11] unencumbered funds at this point in time [1:02:14] at that point in time? So, we know [1:02:16] exactly what we have left. [1:02:19] » Does that sound doable? [1:02:21] » No. [1:02:22] » Is that possible? [1:02:23] » Yeah. [1:02:25] » Yes. Thank you. Because right right now [1:02:28] we're kind of working in the dark a [1:02:31] little bit. I mean, I have an idea in my [1:02:33] head, but I suspect I'm way off. [1:02:39] » All right, other comments. [1:02:43] Um, this was asked of me to bring up by [1:02:47] the insurance and risk manager of the [1:02:50] town. And the question was, why [1:02:54] wasn'tification [1:02:56] made to her when there was an accident [1:03:01] that damaged equipment or damaged a [1:03:05] table out in the front of McMahon [1:03:09] Whittenbury Library [1:03:11] last year. [1:03:16] I'm I'm not aware of what uh [1:03:19] » Uh car came off the road by avoiding [1:03:22] another vehicle, came across the [1:03:26] um [1:03:28] concrete. There were tire marks across [1:03:30] the concrete, black tire marks from [1:03:32] skidding and hit one of the tables which [1:03:36] was and needs to be replaced. [1:03:40] Not sure that's a library building [1:03:41] committee discussion to be had. [1:03:43] » Thank you. That took the words out of my [1:03:45] mouth. I don't think the building [1:03:47] committee is simply an operational [1:03:50] issue. So, okay. [1:03:51] » I think there might have been some [1:03:53] confusion. Um she she may have thought [1:03:54] it was related somehow to the project or [1:03:57] happened during the project, but um it [1:04:00] was like last November or something [1:04:02] totally unrelated. Um if she's asking [1:04:04] about that, Joe. [1:04:06] » Okay. I'll I'll advise her. That's all. [1:04:09] All right. Any other items from the [1:04:11] committee? [1:04:12] » I I had a totally random question. Um I [1:04:15] was just scrolling through some pictures [1:04:17] I had taken of the job site in my phone [1:04:20] and I just want to verify uh the cross [1:04:22] slope on the driveway apron. Um the [1:04:25] sidewalk that goes through is that cross [1:04:28] slope intended to be uh less than 2% [1:04:32] to match the sidewalk. [1:04:36] » I suppose that's Jeff. uh in your your [1:04:39] ballpark. [1:04:41] » I just noted it was rather steep walking [1:04:44] across it and I just want to make sure [1:04:45] if it was intended to be [1:04:47] » Can you send me that picture and uh your [1:04:50] question and I'll I'll get an answer for [1:04:52] you. [1:04:53] » All right. Thank you. [1:04:53] » Is that just at the which which end of [1:04:56] the drive is that the [1:04:57] » Um towards the the east closer to the [1:05:01] fire department? [1:05:02] » Okay. Yeah. send me a picture and then [1:05:04] yeah, [1:05:06] we'll we'll double check it with the [1:05:08] drawings and make sure. [1:05:09] » All right. Thank you. [1:05:13] » Okay, other items from the committee. [1:05:19] » All right, let's move on to future [1:05:21] meetings we've got. And thank you [1:05:23] everybody for accommodating us one week [1:05:26] earlier than planned tonight. Next [1:05:28] meeting uh special meeting is October [1:05:32] 21st [1:05:33] and then uh November 18th [1:05:37] and uh with that uh any members of the [1:05:41] public with their hand up. [1:05:45] Okay, thank you for joining us with that [1:05:49] motion. [1:05:51] » Moved by Mr. Berman, second by [1:05:54] » Patrick. [1:05:56] All right. All in favor of journeying, [1:05:58] please say I. [1:05:59] » I. [1:05:59] » Nay. [1:06:01] » Anybody abstaining? [1:06:02] » Nay. [1:06:04] » It passes in spite of Patrick. [1:06:07] Thank you all. [1:06:11] » You don't want it to end.