Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:36]
How about now?
[0:40]
>> Okay. I'd like to call this regular
[0:41]
council meeting of Monday, July 27th,
[0:44]
2026 to order. I'm the acting mayor for
[0:47]
the month of July. Um, Mayor Leonard may
[0:49]
or may not be able to join us depending
[0:51]
on where where he is on his vacation.
[0:56]
And um
[0:59]
so the as we open the meeting, I'd like
[1:02]
to acknowledge with gratitude that we
[1:03]
live and work on the traditional
[1:05]
unseated territory of the Squamish
[1:07]
nation whose people have been stewards
[1:09]
of these lands and waters surrounding
[1:11]
Nqualikum Bone Island. Um and be do you
[1:16]
want to make a few comments before we
[1:18]
approve the agenda?
[1:20]
>> Um I did if you wouldn't mind the
[1:23]
opportunity.
[1:24]
>> Yeah.
[1:24]
>> Thank you. I just um I'm Kristen Watson.
[1:27]
I'm the acting CEO for Bowen Island
[1:29]
Municipality. I just wanted to take this
[1:31]
opportunity to thank staff, thank
[1:33]
council. We had a very um significant
[1:36]
interruption in our last council
[1:37]
meeting. It arose from a situation where
[1:41]
um some nefarious players entered our
[1:44]
online council meeting and chose to um
[1:48]
expose themselves on live uh YouTube
[1:51]
which uh resulted in the fact that our
[1:54]
council meeting uh was taken down
[1:56]
immediately by YouTube. They canled our
[1:58]
account for a short time until we were
[2:00]
able to successfully get it back. Uh I
[2:04]
just wanted to thank the public for the
[2:06]
opport for the um understanding of our
[2:09]
new uh meeting registration procedures
[2:12]
which are requiring that people register
[2:14]
in advance in order to keep our future
[2:16]
meetings secure and not have a
[2:18]
reoccurrence of that event. So, I just
[2:20]
wanted to dispel any rumors or about
[2:22]
what happened there, but certainly it
[2:24]
was uh beyond the control of staff,
[2:26]
beyond the control of uh uh council, and
[2:30]
I just wanted to thank everybody for
[2:31]
their understanding going forward with
[2:33]
our new meeting registration procedure.
[2:35]
So, thank you very much.
[2:36]
>> So, you mean that you need to be
[2:38]
registered online in order to speak
[2:41]
online? Is that what you're trying to
[2:42]
say?
[2:43]
>> Yes, that's correct. If you want to
[2:44]
participate online and you want to
[2:46]
speak, you'll have to re uh register in
[2:48]
advance for the new meeting.
[2:50]
>> So, I think the new instructions are up
[2:53]
with the um council agenda when it gets
[2:56]
posted.
[2:58]
>> That's correct. Okay. All right. So, if
[3:01]
anybody is online and wanting to um
[3:05]
register to speak, they're going to have
[3:07]
to follow through the new processes for
[3:08]
this particular meeting. Thank you.
[3:11]
Okay. All right.
[3:14]
So I forgot to introduce the council
[3:16]
members that are sitting here at the
[3:18]
table. So we have councelor Su Ellen
[3:19]
Fast, councelor Judy Getty, our uh
[3:23]
acting CEO and CFO
[3:26]
Chris Watson, uh Sophia Inda, our
[3:29]
corporate officer, Tim Wake, counselor
[3:31]
Tim Wakeake, and counselor John
[3:33]
Saunders. Thank you. Okay, approval of
[3:37]
the agenda. Is there any late items,
[3:39]
Sophie?
[3:40]
Uh there are several on table items uh
[3:43]
this afternoon. First is 7.1A
[3:46]
correspondence from neighbors of 1639
[3:49]
and 1658 Mount Gardner Road. Uh in
[3:52]
relation to item 7.2 there is a replaced
[3:56]
attachment to the staff report and that
[3:59]
is the amended islands trust policy
[4:01]
checklist. Item 7.2E
[4:04]
new correspondence from Heather Miller.
[4:07]
7.2F 2F new correspondence from an
[4:09]
Frankfare Shalot.
[4:14]
Can I have a motion for approval of the
[4:16]
agenda, please? As amended.
[4:20]
Thank you. And a seconder, Judy. Um, all
[4:24]
in favor?
[4:25]
>> Oh, sorry.
[4:26]
>> I just We just heard from Alex. He's
[4:28]
wait he's in the waiting room.
[4:32]
Uh,
[4:37]
sorry I don't.
[4:40]
Steph, do you have um councelor
[4:41]
Jurgensson in the waiting room?
[4:46]
» He sent a text indicator and that's
[4:48]
where he is.
[4:48]
>> Oh, I wonder if he went through the
[4:49]
registration process.
[4:58]
» Uh, so just to note, our deputy
[5:00]
corporate officer is here. uh assisting
[5:04]
>> our our deputy corporate officer is here
[5:07]
assisting with the um with the Zoom
[5:09]
meeting.
[5:11]
>> Unfortunately, we don't have councelor
[5:13]
Jurgensson in the waiting room. So, I'm
[5:15]
not sure.
[5:19]
» Uh so, we'll just let um staff work on
[5:22]
that with councelor Jurgensson.
[5:25]
So, are we okay to go ahead with public
[5:28]
comments then?
[5:34]
Okay, let's uh do we have any public
[5:36]
comment? I think we might have one. We
[5:39]
do.
[5:41]
Uh we actually have three this
[5:44]
afternoon.
[5:46]
And the first one is uh Rob Perie, but I
[5:48]
don't see him online either.
[5:52]
Um so maybe we can skip to the people
[5:55]
who are here. Uh so that's an Frank
[5:58]
defer.
[6:07]
So I'm going to read the letter that I
[6:08]
sent and is part of your you know
[6:11]
whatever it was on table package. Your
[6:15]
worship and counselors first I would
[6:17]
like to apologize for being so late at
[6:20]
giving you my fe feedback about item 272
[6:24]
on today's agenda.
[6:28]
On May 26, I provided you with a report
[6:32]
titled The Future of the Riley's
[6:34]
Heritage Apple Orchard. It gives a
[6:37]
detailed description of the orchard, its
[6:40]
creation, history,
[6:43]
maintenance notes, ulticultural notes,
[6:46]
and the conclusion is as follow. I
[6:49]
quote, "It is evident that the Ry's
[6:51]
heritage apple orchard needs to be
[6:54]
preserved. Any potential solution has to
[6:58]
take into account the legacy that led to
[7:01]
the creation of this unique and
[7:03]
extraordinary treasure. And so a proper
[7:06]
perpetual conservation covenant is
[7:09]
needed. Such a perpetual conservation
[7:12]
covenant has to fulfill two
[7:15]
requirements.
[7:17]
The Riley's Heritage Apple Orchard has
[7:20]
to be integrated into a land trust that
[7:24]
will monitor the orchard twice or three
[7:27]
times annually and provide BIM with
[7:32]
assessments of the health and
[7:33]
maintenance of the orchard.
[7:36]
Two, the horicultural maintenance has to
[7:39]
be tailored to this particular heritage
[7:42]
orchard as practiced by the Whan
[7:45]
community orchard. The Whan community
[7:48]
orchard h have the expertise to give
[7:51]
guidance for the preservation of the
[7:53]
Riley's Heritage Apple Orchard. The
[7:56]
purpose is to allow for the production
[7:58]
of apples at a rate where the health of
[8:01]
the trees is preserved for a long time.
[8:05]
Espalade apple trees are known for
[8:07]
exceptionally long longe longevity
[8:12]
sometimes even exceeding
[8:15]
50 years. This is in complete
[8:18]
contradiction to Mr. Pertie's assession
[8:21]
of apple trees living only 30 years. The
[8:25]
challenge appears to be the write up of
[8:28]
such a perpetual conservation covenant
[8:31]
that will assure that the orchard will
[8:33]
be constantly maintained to prevent the
[8:36]
decline [clears throat]
[8:38]
to prevent the decline and well into the
[8:41]
future in order to preserve this unique
[8:44]
and extra generate born island treasure.
[8:47]
Thank you.
[8:53]
» Uh thank you. Next on the list, we have
[8:54]
Margaret Underh Hill.
[9:01]
» Thank you. This is about 620 Laura Road,
[9:03]
of course. Um and as we reported to
[9:06]
council in May when the neighbors
[9:08]
discussed with Rob Perie in May about
[9:12]
the concept of um the resoning proposal,
[9:15]
we were reluctantly agreed with with the
[9:18]
resoning proposal with restrictions on
[9:21]
the retail and picnic area size and a
[9:23]
conservation covenant to protect the
[9:25]
orchard. The relationship of the cery to
[9:28]
the heritage orchard has been emphasized
[9:29]
by applicants and councils for five and
[9:31]
a half years. The latest wrinkle, the
[9:34]
proposal to change the cidery definition
[9:36]
again after five and a half years of the
[9:38]
existing definition would not require
[9:41]
any on-site apple input. What effect
[9:44]
will this have on a conservation
[9:46]
covenant and the future of the heritage
[9:49]
orchard? If this proposal was in a
[9:51]
letter dated July 21st, as indicated in
[9:54]
Mr. Martin's report the same date as the
[9:56]
applicant's submission to the APC. Why
[9:58]
wasn't this proposal re revealed to the
[10:01]
APC? A lot of their discussion was about
[10:04]
the percentage of apples required from
[10:05]
the 620 property. The planner's
[10:08]
presentation at the APC meeting still
[10:10]
showed the original cery definition made
[10:12]
no mention of a new proposal. This is
[10:15]
disturbing at this advanced stage of the
[10:17]
process. Thank you very much.
[10:24]
Thank you. That it [clears throat]
[10:26]
>> uh unfortunately I don't see uh Rob
[10:28]
Pretty online either. So um I guess we
[10:32]
move on.
[10:32]
>> Okay, we'll move on to delegations.
[10:38]
And our first delegation is an electric
[10:41]
vehicle charger upgrade project for the
[10:44]
library in the community center. We have
[10:46]
representatives from BC Hydro. Is this
[10:48]
Phil Garber? Thank you.
[10:50]
>> Thank you.
[10:52]
>> Uh first off, thanks so much for having
[10:55]
us. Um my name is Philip Garber. I'm
[10:57]
with BC Hydro's EV charging program and
[10:59]
joined by Sabrina Lux Cisero, our
[11:01]
community relations manager for Bone
[11:04]
Island. Um, so we
[11:08]
approached um,
[11:12]
Kirsten Watson and staff u a few I guess
[11:15]
a couple months ago to pick up uh, a
[11:19]
development that we had well a couple of
[11:22]
years ago where we first explored um,
[11:24]
installing some charging infrastructure.
[11:27]
So I wonder I I did provide some pres
[11:29]
the presentation um if if that is
[11:31]
available.
[11:34]
>> Just um hang on a minute while we
[11:36]
>> Can you get that up Sophie?
[11:39]
>> So I can while while we pull that up um
[11:43]
I can speak to our program first um the
[11:47]
EV PC hydro public charging program.
[11:51]
it's its mandate, it's its mission, its
[11:52]
goal, and it's kind of the
[11:54]
>> the phase that in the development of the
[11:56]
program we're at right now. And then
[11:58]
come to to Bowen Island as well. Um what
[12:00]
we are essentially are offered to to the
[12:03]
community of Bowen Island. So BC Hydro's
[12:07]
been in the public EV charging space for
[12:11]
over a decade now. One one of the first
[12:13]
networks and longest standing networks
[12:14]
in North America. Uh it started with a
[12:17]
site in Animo and Cam Loops and a few
[12:19]
others. And over the last few years,
[12:22]
it's really grown and evolved to become
[12:24]
a real uh a backbone really to to EV
[12:29]
electric vehicle travelers in in the
[12:32]
province. So we in 2024
[12:35]
uh concluded construction of the
[12:38]
electric highway, BC's electric highway,
[12:40]
which essentially connected
[12:42]
folks in the entire province. You you
[12:44]
could feasibly travel from Victoria to
[12:47]
the Yukon border or to Alberta. um
[12:51]
with a charger every 150 kilometers or
[12:53]
so and and BC Hydro contributed to that.
[12:56]
We can move along a couple of slides
[12:58]
here um and to the next slide here. This
[13:01]
is just kind of an overview of where the
[13:03]
charger the sites are. So to date we
[13:07]
operate 190 sites almost a little over
[13:10]
900 charging ports across the province
[13:12]
and the electric highway the mandate was
[13:15]
make sure that it's doable driving
[13:18]
across the province. So uh a
[13:21]
geographically geographically connected
[13:24]
corridor that meant that communities
[13:27]
like Bowen Island were close enough to
[13:30]
feasibly to to let's say a charger on
[13:33]
the Northshore to not necessarily be
[13:36]
prescribed that we build a charge site
[13:37]
here. We didn't have that opportunity
[13:39]
under that buildout. Uh now just last
[13:42]
week the province announced a an
[13:44]
expanded mandate for BC Hydra's charging
[13:46]
program to grow this network from 900
[13:48]
ports to 3,500 ports. Uh a quadruple
[13:52]
almost quadrupling at least a tripling
[13:54]
um a major major investment
[13:57]
provincewide. And that allowed us to
[14:00]
revisit communities like Bowen Island
[14:03]
where that we had on our kind of on our
[14:06]
higher priority list where we say, "Hey,
[14:09]
it is it is a community that has
[14:12]
electric vehicles. It is an a sign
[14:15]
sizable stock. It is a community that
[14:17]
has a sizable um visitor traffic too.
[14:20]
Even even today, I was surprised how
[14:22]
busy that ferry was on Monday morning."
[14:24]
Um turns out I shouldn't be. Um, so
[14:29]
that's that's kind of where we're coming
[14:30]
to in the next evolution of our program.
[14:33]
So if we click click to the next slide,
[14:37]
um, it it should speak to or illustrate
[14:40]
what some of our sites look like. Our
[14:42]
classic branding, uh, equipment gets
[14:44]
better every year. If we go to the next
[14:47]
slide, it should tell us kind of what we
[14:49]
look for in a site. So we have
[14:52]
requirements put on us by the regulator
[14:55]
BC utilities commission requirements put
[14:57]
on us by our funding partners that's the
[14:59]
federal NRCAN program and the provincial
[15:02]
clean BC program those include 247 365
[15:06]
unrestricted access uh they include a
[15:10]
minimum number of chargers which is now
[15:13]
a minimum number of two chargers in our
[15:15]
case that's four charging stalls four
[15:17]
charging ports they include um
[15:21]
requirements for accessibility. So you
[15:23]
see in that picture, this is a site in
[15:25]
at a at a the Suriri Art Center at Berry
[15:28]
Creek Park. You can see an accessibility
[15:30]
lane and wheelchair accessible. We've
[15:32]
actually worked with manufacturers to
[15:33]
make sure the the screen is a at an
[15:36]
appropriate level as as a major
[15:38]
purchaser of this kind of equipment.
[15:40]
We've been able to to work with
[15:41]
manufacturers on that. So it is uh those
[15:44]
are some of the requirements. A 10-year
[15:46]
location commitment is also a
[15:48]
requirement that we have from our
[15:49]
funding partners and we do um all that
[15:53]
in mind we we come to communities saying
[15:57]
this is what we need to make an
[16:00]
investment. Um we understand the context
[16:03]
here that land is scars especially in
[16:07]
hightra areas where the amenities are.
[16:09]
So this is an offer we'd like to make.
[16:11]
Right. So we if we go to the next slide
[16:15]
um we
[16:19]
one of the benefits of working with us
[16:20]
is that PC hydro carries the entirety of
[16:24]
the capital and operational costs
[16:25]
related to the site to to the chargers.
[16:28]
So it is a sizable investment to install
[16:30]
the service connection, the transformer
[16:32]
infrastructure, the chargers themselves,
[16:34]
and maintain the chargers so that if
[16:36]
there's one of the two chargers goes
[16:38]
down, which happens not that often, but
[16:41]
it does happen, you have to plan for it.
[16:43]
Um, we bring crews out to to to repair
[16:46]
those. Now the typically the site host
[16:50]
partner will maintain the stalls the way
[16:52]
they already maintain the stalls today.
[16:54]
So,
[16:56]
it's nothing above and beyond on the
[16:58]
site host partner. That would be what
[17:00]
we're offering here is the the
[17:01]
municipality and we could provide some
[17:03]
information, some data on how many users
[17:05]
there's been per per month or per year
[17:07]
for your own reporting, your own goals.
[17:09]
Um, so
[17:12]
all that said, I think I have some
[17:14]
slides on the locations we looked at.
[17:16]
So, this is what the charges look like.
[17:18]
40 cents a kilowatt hour, 180 kilow. So
[17:21]
what that means a full like a a car will
[17:24]
now be able to charge in 20 30 minutes
[17:26]
or average charge is 30 minutes. A top
[17:29]
up can be 15 minutes sometimes 45
[17:31]
minutes depending on this how empty the
[17:33]
tank is and essentially and how big the
[17:36]
battery is the tank is. Um so that's a
[17:39]
significant upgrade from the flow
[17:41]
chargers that are currently in place at
[17:43]
your sites.
[17:45]
And if we click along do we have is it
[17:48]
in the same presentation? Yes. So
[17:51]
we looked at a few sites
[17:54]
um working with the municipality and
[17:56]
again
[17:58]
we absolutely know that parking is
[18:00]
scarce. We we understand that. So what
[18:04]
we came to is are looking to offer is
[18:07]
building the site at at the library site
[18:11]
property. So you currently have two
[18:14]
level two chargers, two stalls dedicated
[18:16]
to EVs. With the accessible stall, that
[18:19]
would unfortunately turn into five from
[18:23]
two to five. Um my understanding that's
[18:26]
probably the biggest hurdle is to to
[18:29]
overcome that. Um
[18:33]
we looked at a few other sites and I can
[18:35]
speak to those too. But in terms of the
[18:38]
our requirements to as mentioned before
[18:41]
with the accessibility with with the
[18:43]
safety with um keeping the construction
[18:46]
costs feasible as well is is is critical
[18:49]
because we we do have to stretch these
[18:51]
investment dollars that we have across
[18:52]
the entire province. So we have metrics
[18:54]
to hit and on a small site those are
[18:56]
kind of tough to hit. So, uh, this is
[19:00]
where we're offering and and if council
[19:03]
and community are supportive, we can
[19:05]
look to build that this winter um before
[19:08]
next summer.
[19:10]
If council and community would like to
[19:13]
deliberate further or say maybe let's uh come back another time, we can
[19:18]
come back another time, but I can't
[19:20]
speak to how quickly we can slot that
[19:22]
into the construction schedule because
[19:25]
again, come summer, we we can build in
[19:27]
the whole province. We need to build
[19:29]
sites elsewhere in the province when
[19:31]
there's no snow on the ground.
[19:33]
So that's
[19:35]
I I'll leave it with this and and
[19:37]
welcome uh questions and feedback and
[19:40]
comments.
[19:42]
>> Councelor Saunders,
[19:44]
>> thank you. Thanks for showing us. I um
[19:46]
you said you looked at sites or
[19:49]
>> what other sites did you look at? Yeah.
[19:51]
So, we we when we first started
[19:53]
screening two years ago, um we uh worked
[19:57]
with with the CEO at the time um to
[20:00]
explore different areas in the in the on
[20:03]
the island and quickly narrow aligned
[20:05]
that Snug Cove would be the place to
[20:07]
make sense because this is where traffic
[20:09]
everyone comes through here, right?
[20:11]
Also, when there's a power outage is
[20:14]
Snug Cove is usually
[20:16]
less affected than the rest of the
[20:18]
island, right? as you would know better
[20:20]
than I do. Um,
[20:22]
so sites that we looked at were
[20:24]
municipally owned. So this is one.
[20:26]
Another one is right out front of here.
[20:29]
Um, that at the municipal hall, we we
[20:32]
costed that out. Uh, significant
[20:35]
additional cost related to to this site
[20:37]
here. And my understanding and speaking
[20:39]
with council gate gate Getty
[20:44]
>> is that these stalls here are even more
[20:48]
um constrained or more popular than down
[20:50]
by the library.
[20:51]
>> Uh so in terms of I we also explored an
[20:55]
early stage two years ago the artisan
[20:58]
square. Um,
[21:00]
however,
[21:02]
I mean, it's it's
[21:06]
technically probably most sites are
[21:07]
doable. It's the way the layout is
[21:10]
there, you understand, is is less
[21:12]
efficient here. Here's five stalls for
[21:14]
four ports. There it might be seven or
[21:16]
eight stalls for four ports because we
[21:18]
have to place all the equipment and in
[21:20]
the parking stalls here, we have some
[21:21]
green space to place the equipment. Um,
[21:24]
>> this is this is the best option. This is the the the least
[21:30]
>> difficult option. Yeah. [laughter]
[21:34]
» Municipally owned option.
[21:36]
>> Anybody else got any questions?
[21:38]
Councelor Fast,
[21:39]
>> thank you. I'm um I'm wondering if we
[21:42]
have um data from the flow stalls and I
[21:46]
don't know if this is a question for mo
[21:49]
municipal staff or whether you know but
[21:51]
the um uh I'm wondering if those
[21:56]
existing stalls which I gather are
[21:59]
slower charging uh how what's the use
[22:04]
pattern there? Are they being used or
[22:06]
are people sort of squatting in them and
[22:08]
pretending to charge? I wonder
[22:15]
um through the marriage and counselor
[22:17]
fast. Uh certainly we can um pull the
[22:20]
data that's available from flow um from
[22:23]
the corporation themselves that's
[22:24]
accessible to us. can see what kind of
[22:26]
statistics we can get from that. And uh
[22:29]
we can also have a chat with bylaw to
[22:31]
see what kinds of tickets may have been
[22:33]
issued for violations of parking and not
[22:37]
being um an EV parking in the EV stall.
[22:40]
So um I can certainly request that data
[22:43]
from staff and get back to you at a
[22:44]
later council meeting in September.
[22:46]
>> Thank you. because I'm I'm wondering
[22:48]
about the need and uh what data we might
[22:51]
have uh about those and uh I think you
[22:55]
know [clears throat]
[22:56]
I'm just do we want to attract more
[23:00]
cars? I saw in your uh slide deck the words more sustainable future and um
[23:06]
Bowen has been heading towards that
[23:08]
direction as well obviously uh
[23:13]
partly by not trying to attract more
[23:16]
vehicles here. However, I'm uh I think
[23:20]
this is a great offer to explore. Do you
[23:22]
do bike charging? because we have two um
[23:26]
bike sheds down at the uh at the public
[23:30]
warf that are set up to perhaps at some
[23:34]
point charge bicycles.
[23:37]
>> At at the current point, our program
[23:39]
focuses on cars and larger vehicles than
[23:42]
that. Um
[23:43]
>> Okay. Thank you,
[23:46]
>> Councelor Saunders.
[23:47]
>> Thank you to the chair. Just one more
[23:48]
thing. when you uh in your presentation
[23:51]
you indicated you know there's budget
[23:54]
and a plan to move ahead with a bunch
[23:57]
you know another 2500 or whatever it was
[24:00]
and we'd certainly be considered and
[24:02]
then you said um to be done next you
[24:05]
know next spring or during the winter
[24:08]
ready for next summer
[24:10]
which implies to me there's a deadline
[24:12]
here and you didn't indicate what that
[24:13]
meant what do you need if we were to say
[24:16]
yeah this is a great plan we want to do
[24:18]
it What's our time frame?
[24:21]
>> Yeah, it's tighter than I'd like. Um,
[24:23]
especially considering just how involved
[24:26]
the community seems to be here. Um, I
[24:28]
would need to we would need to move this
[24:31]
into detail design by the end of this
[24:33]
month. So,
[24:35]
>> next week
[24:36]
>> I would need to come out from this
[24:37]
presentation and from this conversation
[24:39]
with you and and have strong confidence
[24:42]
that that there will be support to move
[24:44]
forward. If not, we we look our
[24:47]
program's going to be around. We don't
[24:48]
want to say this is it's this or never
[24:50]
going to happen, right? Our programs
[24:52]
around. PC Hydro is around. We don't go
[24:54]
anywhere. Um
[24:56]
we I mean the hydro just bought invested
[24:59]
in the community here. So it's it's
[25:02]
we can come back, we can have another
[25:05]
conversation. Um
[25:07]
we'll slot it in at a later time. So
[25:10]
strong confidence means a motion from
[25:13]
council or like an a past motion from
[25:15]
council or just listening to our
[25:18]
response here. You go, "No, I think
[25:19]
they're going to do it."
[25:20]
>> No, I a motion would be great. Yeah.
[25:23]
>> Yeah. And if that's not realistic,
[25:24]
that's fair. That's totally fair.
[25:26]
Usually timelines aren't this tight by
[25:29]
any means.
[25:30]
>> Thank you.
[25:30]
>> I understand that. Councelor
[25:32]
>> We thank you through the chair. Um,
[25:37]
following up on council fast question.
[25:39]
So, currently we have just uh level two
[25:42]
chargers and they take hours. Um, and a
[25:48]
lot of people who have EVs on Bowen have
[25:50]
their own level two chargers at home.
[25:52]
I'm just wondering if it would make it
[25:54]
more sense and safe some parking stalls
[25:56]
if we just had fast chargers there and maybe the numbers that we're going
[26:01]
to get will show us how much those have
[26:03]
actually been utilized.
[26:04]
>> Yeah. So the the the proposal here would
[26:06]
actually free up those level two
[26:08]
chargers, municipally owned level two
[26:10]
chargers to be deployed elsewhere. There
[26:12]
will be only two fast charges down
[26:13]
there. Four that could charge four
[26:15]
vehicles at once.
[26:16]
>> Oh, I see. Okay. Thank you,
[26:20]
>> Council Getty.
[26:21]
>> So, um council was given an invitation
[26:24]
to meet up with Mr. Gerber and um
[26:26]
earlier this morning. So, um I took
[26:29]
advantage of that with the um the li the
[26:32]
chief librarian and um we talked about
[26:36]
uh how basically the the from BC Hydro's
[26:40]
point of view the the space by the and
[26:42]
correct me if I'm wrong on this. Okay,
[26:44]
summarizing but I remember um that it's
[26:48]
almost shovel ready so that uh we don't
[26:50]
have the detailed plans but we can get
[26:52]
into that process if if we agree on um
[26:55]
the library and we talked about um the
[26:58]
real estate being at uh and parking
[27:01]
spaces being so difficult in the cove
[27:04]
and that that's not getting any better
[27:06]
and we haven't been able to figure out
[27:08]
other spaces that we might be able to um
[27:10]
use as uh some sort of municipal
[27:14]
government leverage to get more space.
[27:16]
Um, and the um
[27:20]
I'm sorry, I'm forgetting the
[27:22]
librarian's name.
[27:24]
>> Thank you. Um, she suggested u
[27:28]
possibility of the lot that's below the
[27:30]
general store, which means a whole lot
[27:32]
of negotiating and contacts with other
[27:35]
people, but I didn't think it would be
[27:36]
that difficult to um have have those
[27:40]
conversations. that that was an area
[27:42]
that um we were we had a lot of good
[27:46]
reception from the the owners of that
[27:48]
property. So that's one possibility um
[27:51]
that is only just come onto the radar so
[27:54]
that there's no even preliminary um
[27:57]
discussions but we did a walkound and
[27:59]
there's potential for getting power into
[28:02]
it and potential space and um you know
[28:04]
it might it might be feasible. Um
[28:07]
there's the problems with the artisan
[28:09]
square is that the areas that are
[28:11]
parallel parking there's a cliff behind
[28:13]
it. So it's very very difficult in terms
[28:15]
of providing all the um requirements in
[28:19]
terms of what VC Hydro wants. Um,
[28:22]
there's the fire hall, but that's too
[28:24]
far away and it's not around the
[28:26]
amenities and it's quite isolated. And
[28:29]
there's other parts on the the west side
[28:31]
that were looked at earlier two years
[28:33]
ago that uh basically are are don't fit
[28:37]
the requirements in terms of being on
[28:38]
the other side of the world and not
[28:41]
having any of the amenities that uh we
[28:43]
might get in 10 years. And the other
[28:45]
thing is that if this if we I think the
[28:48]
decision today from my perspective is
[28:50]
are we gung-ho and we want to um push
[28:54]
this um amenity at the library or do we
[28:59]
think about things and come up with some
[29:00]
other plans because the the program
[29:02]
isn't going away. the funding is like to
[29:05]
stay the same or increase and um you
[29:08]
know
[29:10]
do we want more options um and not that
[29:13]
they're necessarily going to be
[29:14]
available but do we want to look at them
[29:17]
so um it you know it might be a
[29:19]
disappointment but I don't think we're
[29:21]
losing the opportunity so
[29:25]
thought I'd put all that on the table
[29:27]
fair enough
[29:28]
>> so I just had a couple for first round
[29:30]
and then um I I was wondering if you had
[29:33]
looked at the area up by um on Dorman
[29:36]
Road by Village Square. There's par
[29:40]
angle parking there and that's where the
[29:43]
main line comes in. Um cuz I'm the
[29:48]
library is already well used and
[29:51]
overused and not able to get into most
[29:54]
days, especially when the library is
[29:56]
open. So, um I'd be concerned about
[29:59]
taking away another two spots.
[30:02]
Um,
[30:04]
and do you have to have the two together
[30:06]
or could you do two in one one charger
[30:08]
in one place and one charger in another
[30:11]
place? And then my last question I guess
[30:12]
is this isn't on the agenda for
[30:14]
discussion today and we don't normally
[30:17]
pass motions with delegations. So it
[30:20]
would be and we're not going to meet
[30:21]
again until September. So if we were to
[30:24]
discuss it in a meeting in September, is
[30:26]
that too late for your time frame?
[30:30]
>> Yeah. So the September question is if we
[30:33]
want to build it this winter. September
[30:34]
is too late. Uh however if you don't if
[30:39]
I'm sure you can reach me by email too
[30:41]
or we can set up a call later this week
[30:43]
either with some folks or or or you can
[30:45]
debrief with the CEO with staff and and
[30:48]
get back to us that way too. I mean I
[30:50]
get that having the sprung on to you is
[30:54]
Yeah. No, I I get it. You want a ton to
[30:57]
deliberate. So that's one two. Uh the
[31:00]
question is one and one split them up.
[31:02]
Unfortunately that's not an option
[31:04]
because it [snorts] doubles the
[31:05]
construction cost which is most of the
[31:07]
cost of this
[31:08]
>> construction and design and three
[31:11]
village square to me is would be
[31:15]
something new to look at. Uh angle
[31:18]
parking
[31:20]
is from experience from an organization
[31:23]
that's run 190 sites. angled parking is
[31:25]
not great because uh EVs have their
[31:28]
ports, their charging ports or their fuel tanks on various sides and
[31:33]
they might back in an angled area which
[31:38]
don't back in an angle stall is there
[31:40]
signs exist for a reason. Um it it just
[31:44]
causes traffic headaches. We've done it.
[31:46]
We have those sites. They're not great.
[31:47]
They exist. You can do it, but they're
[31:49]
not good.
[31:50]
>> Okay. And um if we didn't go ahead now,
[31:55]
we're not saying goodbye forever to the
[31:58]
opportunity.
[31:58]
>> Absolutely.
[31:59]
>> Um Councelor Jurgensson, I believe, has
[32:01]
um some questions.
[32:07]
» Low audio unmuted.
[32:09]
>> Yes. Thank you, uh Council Morris. Um
[32:13]
through the chair.
[32:15]
Um, so if I understand correctly, the
[32:17]
accessibility features that you uh
[32:19]
mentioned on this are uh wheelchair
[32:21]
height. Is that correct?
[32:23]
>> That's right.
[32:24]
>> Is there any other accessibility
[32:25]
features that have been included uh on
[32:27]
these modules?
[32:30]
>> It's more it's more around the site
[32:32]
design, right? Making [clears throat]
[32:34]
sure every that our sites that are paved
[32:37]
is a big one, right? Gravel and
[32:41]
wheelchairs is can be challenging. Um
[32:43]
that's one. two is how we space the
[32:45]
ballards to make sure that they're a
[32:47]
little wider apart.
[32:48]
>> Name is changed to counselor Alex
[32:49]
Jurgensson.
[32:51]
the the the the charger.
[32:55]
>> I'd have to go back to to and look at
[32:59]
exactly what other specs we incorporated
[33:01]
or or already are incorporated, but
[33:03]
essentially we've worked with the
[33:05]
manufacturers, the the access the adv
[33:08]
advocacy groups and and to make sure
[33:10]
everything's aligned and and we meet certain features
[33:15]
or requirements.
[33:16]
>> Thank you. Um and also my second
[33:18]
question is
[33:20]
do you have um an idea of when if we
[33:24]
don't go forward this winter when we
[33:26]
might be able to uh have another
[33:29]
opportunity or is it just kind of
[33:30]
rolling opportunity?
[33:32]
>> It's a rolling opportunity. It's I'll
[33:35]
say when this pro announcement was made
[33:38]
last week right for the the program to
[33:41]
be scaled up internally we've been
[33:43]
working towards that for the last few
[33:45]
months. So we looked at various looked
[33:48]
at our pipeline and said which sites
[33:50]
could we build this winter right because
[33:52]
to to to make them happen and Bone
[33:55]
Island was on that list um going forward
[33:57]
it's a rolling intake. So if we align on
[34:00]
something in November then we look at
[34:03]
when probably the following winter would
[34:05]
be my guess. If if and if following if
[34:08]
all construction slots are taken then it
[34:10]
might be the next winter. So, it's it's
[34:11]
not like it's never we're here until
[34:15]
mandates change again, but [laughter]
[34:18]
we're here. BC Hydro is here.
[34:20]
>> Okay. Councelor Fast, you had a second
[34:22]
question. Yeah, thank you. Um, and this
[34:24]
sort of follows on uh Councelor
[34:25]
Jurgensson's question, but I I'm looking
[34:28]
at the um drawing for the hydro
[34:32]
proposal, and it looks like it would be
[34:34]
adding another pole to the multi-use
[34:36]
pathway.
[34:37]
>> That's right. in in line with the other
[34:39]
polls
[34:39]
>> with in line with the other polls. But
[34:41]
okay, it's another poll in the multi-use
[34:43]
pathway. All right. And I'm glad to hear
[34:45]
about um uh the program not going away
[34:48]
and uh hope so
[34:49]
>> because I think it is one of the roots
[34:51]
towards a sustainable future. Um I will
[34:53]
note that Bowen rarely has snow in the
[34:56]
winter. So if you have any cancellations
[34:58]
maybe you could um fit but I would love
[35:01]
to see the data and I I wouldn't uh I
[35:04]
think it's very complex you know the the
[35:07]
cove and how many multiple uses
[35:10]
including ferry marshalling and the uh p
[35:14]
passenger drop off and the um buses and
[35:17]
everything that's concentrated in that
[35:20]
uh small area. would there I'd like to
[35:23]
think about whether the buses could be
[35:26]
included in electrification, you know,
[35:29]
um looking further down the uh um down
[35:33]
the way and uh so I'm
[35:38]
thank you for coming with your ideas.
[35:41]
I'm I'm excited about the possibilities.
[35:43]
I'd like to think about it a bit more
[35:44]
and have some more information and hear
[35:46]
from the library board and or the
[35:48]
library too. Thank you.
[35:49]
>> Absolutely.
[35:51]
Any more questions? So, thank you very
[35:54]
much for your presentation and we'll be
[35:56]
adding it to an agenda item for
[35:58]
discussion at a council future council
[36:00]
meeting when we read come back to again
[36:03]
after our August break.
[36:05]
>> Okay. Thanks so much. Thanks for the
[36:07]
opportunity.
[36:07]
>> Thank you.
[36:12]
» Okay. Who's next?
[36:18]
» And we've got the Hearth delegation
[36:19]
next.
[36:39]
ready.
[36:41]
>> Okay. Uh, good afternoon to Mayor and
[36:43]
Council and thank you for welcoming us
[36:45]
to present today. I'm Samantha Brett.
[36:47]
I'm the programming and production
[36:49]
manager for the hearth arts and I'm
[36:51]
joined by Gail Lutenberg who is what are
[36:53]
your are your full
[36:54]
>> chair of the performing arts committee
[36:59]
um the hearth arts on Bowen through the
[37:01]
efforts of our performing arts committee
[37:02]
which we refer to as the pack is
[37:04]
celebrating the first full year of the
[37:06]
hearth arts on Bowen present series at
[37:07]
the Bowen theater. This work has been
[37:10]
done with the support of the Bone Island
[37:11]
Municipality and a very large group of
[37:13]
volunteers who have contributed their
[37:15]
time and resources to this inaugural
[37:17]
program. Our goal is to build on the
[37:19]
success of this first year both
[37:20]
programmatically and financially as we
[37:22]
look towards the 2627 season. We intend
[37:25]
to increase both earned revenue and
[37:27]
fundraising revenue over the next 12
[37:29]
months to largely offset the expense of
[37:31]
the programming and production manager
[37:32]
position while we maintain a strong
[37:34]
community focus and accessible
[37:36]
programming. Uh in accordance with the
[37:39]
conditional grant agreement, the hearth
[37:40]
arts is providing our third and final
[37:42]
report today. The purpose of this report
[37:44]
is to fulfill the reporting requirements
[37:46]
um in person as we are. Uh we want to
[37:49]
talk to you a little bit about
[37:50]
programming and community impact. Uh we
[37:52]
uh specifically the arts survey summary.
[37:55]
We have a brief financial overview for
[37:57]
you today for our 2526 fiscal year.
[37:59]
We've got a grant update for you today
[38:01]
and we have some miscellaneous updates
[38:03]
on technical committee and concession
[38:05]
plans. And of course, finally, we are
[38:07]
requesting continued funding for the
[38:08]
programming and production manager
[38:10]
position.
[38:12]
>> So, I'll take over from there and start
[38:14]
by talking a little bit about
[38:16]
programming and community impact.
[38:18]
Starting with the 20 2526 season um
[38:22]
which ended in June, the Hearth Arts on
[38:26]
Bowen proudly showcased a wide variety
[38:28]
of music and dance as the presenter and
[38:32]
also as a co-production partner. Over
[38:35]
1,200 guests attended performances and
[38:38]
represented a wide range of the island
[38:41]
community. And as an independent artist,
[38:43]
I created a community work entitled Come
[38:46]
Dance with Me in conjunction with the
[38:48]
first year anniversary of this center.
[38:50]
And it was with a pleasure to create a
[38:53]
collaboration between BIM and the
[38:55]
Heartharts and myself to bring the piece
[38:58]
to the community. Plus, we were the
[39:01]
first beneficiaries of the community
[39:03]
discounted rental rate for the
[39:04]
presentation of indigenous dancer Alex
[39:07]
Wells. And together, these two events
[39:10]
offered meaningful and joyful free
[39:12]
experiences for the Bowen Island
[39:14]
community.
[39:16]
Upcoming programming for the 2026 27th
[39:20]
season. It's always hard to decide
[39:22]
whether we start in July or we start in
[39:24]
September. So, I'll just start this one
[39:26]
in July from a granting perspective. We
[39:29]
had a show this past weekend which was a
[39:31]
sellout show of Asanav
[39:33]
um a indigenous artist but very
[39:36]
contemporary indigenous artist from
[39:38]
Ontario. It was a soldout show and it's
[39:42]
a new concept um part of something
[39:44]
called our headliner series that
[39:46]
Samantha with um some members of the
[39:49]
performing arts committee have really
[39:51]
are are are bringing to bear. And the
[39:54]
idea is to bring big name acts at a
[39:57]
slightly higher ticket price so that we
[40:00]
might be able to provide surplus
[40:01]
revenues to support an annual local
[40:04]
showcase plus partial funding for the
[40:07]
programming and production manager
[40:08]
position. Up next in September will be
[40:11]
Dan Mangan, also part of that headliner
[40:14]
series, a very big name that we can
[40:16]
charge a higher um higher ticket price
[40:19]
and the tickets sold out in three hours
[40:21]
to give you an idea of the scale of this
[40:23]
person's recognition.
[40:25]
In October, we'll be having a show which
[40:27]
is a second co-production with Comedy
[40:30]
Underground, a local comedy space in
[40:34]
Vancouver. And this is that
[40:35]
co-production model, co-pro model where
[40:37]
we take almost no financial risk and we
[40:40]
create a partnership to bring uh work
[40:43]
from Vancouver to Bowen's uh theater. We
[40:47]
then have Marcus Mosley, a local R&B
[40:50]
sensation from Vancouver. He'll be on
[40:52]
stage in November and that that project
[40:55]
has funding already secured from
[40:57]
Creative BC. And then we go into our
[41:00]
2027 year, still part of the same
[41:02]
season, and we're going to launch our
[41:04]
first January show as a family show.
[41:07]
Last year, we didn't find the best date
[41:10]
in the fall in the spring. So, we're
[41:11]
going to try a a third weekend in
[41:13]
January, which on the docks around the
[41:17]
national programming can be a very good
[41:19]
weekend for family programming. So,
[41:21]
we're going to give it a try with a um
[41:24]
cause and effect circus act for families
[41:28]
called Luminarium. And then we have in
[41:30]
March a Canadian jazz pianist of huge
[41:33]
renown. His name is Michael Caseammer to
[41:36]
play and feature our grand piano.
[41:39]
In April, um Company 605, a contemporary
[41:42]
dance company out of Vancouver, but with
[41:44]
roots in urban dance. And the idea here
[41:47]
is to try and keep growing um an
[41:50]
audience development strategy for youth
[41:53]
to attend contemporary dance. We seem to
[41:55]
be doing really well with youth and so
[41:57]
we thought this might be a way of kind
[41:58]
of leveraging that interest and growing
[42:01]
it. Um we have the Aurora Piano Trio in
[42:05]
May and it's just an aside for those of
[42:08]
you who remember Victor Chan who lived
[42:10]
on Bowen for many many years. It's his
[42:12]
daughter who is the featured pianist of
[42:14]
that trio and one of the reasons why we
[42:17]
selected that company. And finally in
[42:20]
June, we'll end the season with in a
[42:23]
collaboration with Bowen Pride Society
[42:25]
to present That's Gay Comedy. So comedy,
[42:29]
but um with a a the pride theme.
[42:34]
We're currently in conversation with
[42:37]
larger Canadian artists um to round out
[42:40]
that season to fill out the headliner
[42:43]
season and some of them hopefully will
[42:45]
be from a national um this sort of
[42:48]
national scene and I'll talk more about
[42:49]
why that's relevant in a in a later in
[42:52]
the presentation.
[42:54]
Um so now together we're going to move
[42:56]
on to discuss the Bowen Island Art
[42:58]
Survey. It was the first attempt our
[43:00]
organization has ever undertaken to get
[43:02]
a read on our community's preferences
[43:06]
and um there were 30 I'm sorry 46 unique
[43:09]
respondents and we felt it was a
[43:12]
positive experience. Um the survey's
[43:15]
goal was to measure the success of our
[43:17]
year 1 theater programming our ongoing
[43:21]
visual arts work and our general
[43:22]
promotion and marketing of all arts
[43:25]
efforts on Bowen. We also saw were
[43:28]
seeking to identify barriers for
[43:30]
residents to participate in the arts and
[43:33]
encourage programming suggestions moving
[43:35]
forward.
[43:37]
Response to the survey was
[43:38]
overwhelmingly positive. Nearly all
[43:40]
respondents report having attended a
[43:43]
performance at the Bowen Theater and
[43:45]
intend to return. Music and theater are
[43:49]
the most frequently cited favorites,
[43:51]
followed closely by visual arts, dance,
[43:54]
festivals, and workshops. Many
[43:56]
respondents took the opportunity to
[43:58]
praise the current programming, while
[44:01]
others raised specific actionable
[44:03]
concerns around cost, timing,
[44:06]
transportation, and child care. So, I'll
[44:09]
jump in here as well. Um, council can
[44:12]
read u the feedback and the detailed
[44:14]
feedback um at your leisure. will say
[44:17]
that, you know, mostly support for what
[44:19]
we're doing is is what we got. Um, in
[44:21]
terms of I'd like to talk to barriers to
[44:23]
attendance. So, we're always mindful of
[44:25]
the cost. You know, as we look at a
[44:27]
headliner series where we will have a
[44:29]
more expensive ticket to bring larger
[44:31]
names, a series like that, uh, to Gail's
[44:33]
point, will support us to do things that
[44:35]
are more accessible, a more accessible
[44:36]
price tag so that we can offset our
[44:38]
costs to holding things here. Timing.
[44:41]
We've got um uh quite a few um uh mats
[44:45]
happening. So that helps to address that
[44:47]
as well as the transportation. Um child
[44:49]
care, we hear that, which is why we're
[44:51]
doing some family programming and
[44:52]
accessibility. I will point out that um
[44:56]
uh hearing and mobility was mentioned,
[44:57]
but one respondent specifically pray uh
[44:59]
praised the improved accessible parking,
[45:02]
which in conjunction with Lee from the
[45:03]
municipality, we took care of earlier
[45:05]
this season. So that was great. Um we
[45:08]
had notable concerns and suggestions.
[45:10]
Two respondents independently raised
[45:12]
privacy concerns about the survey um at
[45:14]
the last council presentation uh
[45:16]
requiring saying that requiring name and
[45:18]
email uh they were concerned that this
[45:20]
would discourage um honest or anonymous
[45:22]
participation and in response we were
[45:24]
able to immediately create an anonymous
[45:26]
survey option for the last week of the
[45:28]
survey. So we were glad we could address
[45:29]
that. Um we've also um received a couple
[45:32]
of requests for more diverse artistic
[45:33]
perspectives beyond Bowen or BCbased
[45:36]
artists. So, we're looking at that and
[45:38]
we did have a call for more emotionally
[45:40]
challenging or risk-taking programming
[45:42]
rather than safe content. So, what I can
[45:44]
tell you is that the hearth and the
[45:46]
performing arts committee are working
[45:47]
with all of these suggestions and
[45:48]
concerns um to improve access and
[45:51]
programming for everybody. So, um
[45:53]
overall for a first foray into a survey,
[45:55]
we're pretty pleased at the response
[45:56]
that we got and of course it's something
[45:58]
that we will do again at the appropriate
[46:00]
time. Um I'll move on here to give you a
[46:03]
little bit of a financial snapshot now
[46:04]
of the year. Um, Hearthart's fiscal year
[46:07]
runs July 1 through June 30th. We're
[46:09]
still in the process of reconciling this
[46:11]
fiscal year. Um, so the the figures that
[46:13]
you're seeing here were provided by our
[46:14]
finance person to me at the time that I
[46:17]
submitted this proposal two weeks ago to
[46:19]
council. As far as I know, they haven't
[46:20]
changed. Um, right now, this is about as
[46:24]
granular as the accounting gets. I will
[46:26]
tell you that we are working with our
[46:27]
accounting folks and um finance on our
[46:30]
board to uh change up our chart of
[46:32]
accounts so it's a little bit more
[46:33]
granular and we can actually really take
[46:35]
a look at sort of in and out of expenses
[46:38]
uh to do with the theater. So we're
[46:39]
making those changes now. They have been
[46:41]
approved by the finance folks on our
[46:43]
board. But for right now, you basically
[46:44]
can see that, you know, we broke even.
[46:47]
Uh we put a couple of thousand dollars
[46:48]
in the bank, which is great. Uh so we're
[46:51]
very pleased that the first year um
[46:53]
ended in uh ended in a little bit of a
[46:55]
surplus. Um I will point out
[46:57]
specifically two figures I've pulled for
[46:59]
you. Um total rental and custodial fees
[47:02]
paid to the Bowen Island municipality
[47:04]
were just over $6,000. This is from a
[47:06]
report that um uh Sienna Valley kindly
[47:09]
provided to me um from it's a receipt
[47:13]
audit report she provided on July 3rd.
[47:15]
So I'm taking the municipalities numbers
[47:17]
when it comes to that reporting. And I
[47:19]
will just also pull out the contract
[47:21]
marketing expenses. So, our marketing
[47:23]
manager not only works with Hearth
[47:25]
Productions, but as you all know,
[47:26]
because I'm sure you all get the
[47:27]
newsletters and see the posters and
[47:29]
whatnot, um we support and promote all
[47:32]
arts organizations on the island that
[47:34]
provide us with the content to do so.
[47:35]
our expenditure uh to support all of
[47:38]
those efforts was $9,000 um over the
[47:40]
course of the year.
[47:44]
um to add uh financial um revenue to our
[47:51]
season, we are involved in lots of grant
[47:55]
writing and um we have been successful
[47:59]
in three out of the four grants to which
[48:01]
we are um we've applied and are
[48:03]
eligible.
[48:05]
uh June 15th, we apply every year before
[48:08]
we even opened the Bowen the new
[48:10]
community center. We applied for our
[48:12]
first year of funding from BC Live and
[48:15]
we were successful which is why we were
[48:17]
able to put um shows on the stage in the
[48:20]
first season starting in April 20 24.
[48:24]
Did I get that 2025? Okay. Um and then
[48:27]
we received it again in um the the
[48:30]
following year and we've put in an
[48:31]
application what we'll hear in the fall.
[48:34]
But I think we're well um entrenched in
[48:36]
that program. I think we can um likely
[48:39]
will see success on an annual basis.
[48:42]
October 1st is the deadline for Creative
[48:45]
BC. We were successful in our first year
[48:47]
of application to that which was a
[48:49]
surprise to all of us. Not many grant,
[48:51]
not many arts organizations in British
[48:53]
Columbia have thought to apply to that
[48:55]
small little program with create
[48:57]
creative BC. And somehow we managed to
[49:00]
figure that one out and we're in. And
[49:03]
let's hope, fingers crossed, we'll be um
[49:05]
it will be an annual. And on October
[49:08]
15th, we applied to Canadian Heritage
[49:10]
for the first time. It took many um it
[49:13]
took a lot of steps to get to
[49:15]
eligibility for that. We did put in a
[49:17]
strong application, but it was denied.
[49:20]
And we spoke with the program officer
[49:22]
who told us that it is very rare for a
[49:25]
firsttime applicant to be accepted. They
[49:28]
were happy with the application except
[49:29]
that their only caveat was that they
[49:31]
felt we didn't have very much national
[49:34]
um um representation of artists. And so
[49:39]
that's something that's going to have to
[49:40]
go back to the performing arts committee
[49:41]
and to see how far we want to stray in
[49:43]
our programming. Not just not from
[49:46]
Bowen, but not from British Columbia. Do
[49:48]
we want to get into more national recog
[49:51]
um um more nationally recognized
[49:54]
artists, but it is a grant that could
[49:57]
bring a considerable revenue stream of
[49:59]
18,000 is what we applied for in our
[50:01]
first year. Um
[50:04]
we uh did receive our first um we
[50:08]
received just in this year alone in the
[50:10]
2526 season we received $19,000 as well
[50:15]
from the BC Arts Council and that was an
[50:18]
infrastructure grant the exact same
[50:20]
grant that bought the retractable
[50:22]
seating for the theater and it is a
[50:27]
grant um it was it was um infrastructure
[50:31]
purchased through a grant but became an
[50:33]
asset of the municipality. So that was
[50:36]
the um retractable seating and in this
[50:39]
year it was 19,000 for theater lighting
[50:42]
inventory that again is now um a
[50:45]
municipally owned asset.
[50:47]
Um I think that's all I need to present.
[50:52]
>> Yeah. Um I'll jump into miscellaneous
[50:55]
updates. So, uh, a couple of the other
[50:57]
things that we've worked on over the
[50:58]
course of the last year is we have a
[51:00]
technical committee and this is a group
[51:02]
of volunteers once again made up of some
[51:05]
BIM representatives. We have, um, Lee
[51:07]
Vincent and Doug Woods from the
[51:09]
municipality and then community members
[51:11]
who have technical expertise and
[51:13]
background. Um, they've formed uh they
[51:16]
formed a technical committee and so they
[51:18]
work on purchasing together, organizing
[51:20]
equipment, maintaining equipment, um,
[51:23]
running the equipment for the shows.
[51:25]
That is a paid thing, just so you're
[51:26]
aware. When we bring in the technicians,
[51:28]
they get paid for their time to work the
[51:30]
shows, which is great because they're
[51:31]
all Bowen based. So, um that's a revenue
[51:33]
generating thing for those folks. Um
[51:36]
they they've been working sort of
[51:37]
steadily as volunteers on um various um user manuals for the different
[51:44]
equipment that's in the theater. It's
[51:45]
quite complicated. I mean, the theater's
[51:47]
technical. There's a full lighting
[51:48]
system. There's a full sound system. So,
[51:50]
slowly but surely, they've been putting
[51:52]
it together. Um we have I have a
[51:54]
commitment from the committee that we're
[51:55]
going to meet as a group in late
[51:57]
September to complete that work on the
[51:59]
various so we've got a lighting manual
[52:01]
started we have sound manuals started
[52:03]
and we just have basic sort of user
[52:05]
manuals so someone coming into the
[52:06]
theater for the first time for example
[52:08]
we're developing the manuals that they
[52:10]
would use to be able to do basic
[52:11]
operations. Um so this is a resource
[52:14]
we're creating um alongside BIM but for
[52:16]
BIM and for the community that uses the
[52:18]
theater. So, I'm pleased to report that
[52:20]
we've got a date to get that work done.
[52:22]
Um, theater concession planning, this
[52:24]
has been the toughest nut to crack over
[52:26]
the last year. So, there's quite a bit
[52:28]
of challenges when it comes to
[52:30]
concession, but just to sum it up for
[52:32]
you, there just not a lot of money in
[52:33]
the concessions. Um, you know, by the
[52:35]
time you get if you're serving alcohol,
[52:37]
by the time you get a legal liquor
[52:38]
license, you get the insurance, etc., we've only made over the course of
[52:42]
the whole year about $500 in revenue,
[52:45]
and that's from multiple concessions.
[52:48]
So, um, staffing is a challenge.
[52:50]
Technology with, uh, because people
[52:52]
don't always bring cash, of course, they
[52:54]
want an e payment option. Um, lack of
[52:56]
ample storage to be able to to do stuff.
[52:59]
So, all of that said, that sounds very
[53:01]
negative, but it's a nut I'm still
[53:02]
working to crack. Um, and I do think
[53:04]
that there's some things that we can do
[53:06]
from maybe, you know, securing some more
[53:08]
permanent storage to coming up with some
[53:10]
things with local folks, but at very
[53:12]
least to break even because I think a
[53:13]
concession really adds to all the things
[53:16]
that happen in the theater, regardless
[53:17]
of who the organization is that's using
[53:19]
the theater, we'd like to be able to
[53:21]
come up with something so that at very
[53:23]
least uh they can break even and provide
[53:25]
a better experience, guest experience
[53:26]
for their guests. So, that's sort of a
[53:28]
stand stand by and know that we're still
[53:30]
working on all of that.
[53:32]
Um conclusions uh theater programming
[53:36]
has demonstrated strong attendance,
[53:37]
community support and financial
[53:39]
performance. Um the hearth uh is very
[53:42]
happy to contribute to municipal revenue
[53:45]
through rentals fees and external grant
[53:47]
funding. Uh my role, the programming and
[53:49]
production manager role has really been
[53:51]
essential in achieving operational and
[53:53]
programming goals to date. and we're
[53:55]
really hoping for continued investment
[53:57]
to support the further growth and
[53:59]
long-term financial um sustainability. I
[54:02]
would just like to add some personal
[54:04]
thoughts. Um I've been with you guys
[54:06]
over the last year and I've really
[54:08]
enjoyed my time with the hearth. Um
[54:10]
thanks to our amazing volunteers. It's
[54:12]
been a great year of learning and growth
[54:13]
and ultimately success. I think everyone
[54:15]
can sort of give themselves a pat on the
[54:17]
back. Uh I believe we're now in an
[54:19]
excellent position to significantly grow
[54:21]
programming and revenue into the future.
[54:23]
And I want to just finally thank
[54:25]
everyone who supported me with all my
[54:26]
work. I mean, I've run around the
[54:28]
island. I've met with dozens of people.
[54:29]
I've uh yeah, it's it's been quite a an
[54:33]
immersive experience, but it's been a
[54:34]
good one, and I feel like um yeah, I
[54:37]
feel like our efforts have really
[54:38]
benefited the community here. So, thank
[54:39]
you so much for all your support and uh
[54:42]
recommendations. Uh hoping you'll
[54:44]
approve the funding for this position.
[54:46]
We would also like to um have mayor and
[54:49]
council direct the appropriate uh
[54:51]
municipal staff to work with us to
[54:53]
refine uh this role and the
[54:54]
responsibilities and performance
[54:56]
measures for the position. I think
[54:57]
that's important as we go into year two.
[55:00]
And finally, um thank you for receiving
[55:02]
this report for information.
[55:04]
>> Thank you. Does anybody have any
[55:06]
questions for the presentation? And
[55:08]
thank you for an excellent presentation,
[55:11]
Council Getty.
[55:13]
>> Okay. Um, thank you and uh through the
[55:17]
mayor or the delegate. Um,
[55:21]
so I think that it's uh I'm a little bit
[55:24]
worried in terms of the sustainability
[55:26]
of the position. Okay. So that it's
[55:28]
grantheavy in terms of this budget. I'd
[55:30]
be very very interested in all of the
[55:32]
granular details in terms of you know
[55:34]
where we can uh try and help sort things
[55:38]
out so that it uh without raising ticket
[55:40]
prices beyond um what our audience is
[55:44]
used to and what they are you know
[55:47]
willing to pay um and if they you know
[55:49]
this whole thing in terms of wanting
[55:51]
something that's a little edgier whether
[55:53]
or not we can afford it to have it in
[55:55]
this theater. Um yeah, it was our
[55:57]
problem with you know the open house um
[56:00]
>> theater production that we that was
[56:02]
touchandgo in terms of whether or not we
[56:04]
were going to break even in terms of
[56:05]
it's a big space for um a I think that
[56:09]
was an edgy production that uh you know
[56:11]
some people were um it wasn't the
[56:13]
typical audience comedy light you know
[56:17]
costumeheavy kind of thing that our um
[56:20]
our audience seems to enjoy the most.
[56:23]
So, um, in terms of, uh, figuring out,
[56:27]
um, first of all, my question is the
[56:29]
theater expenses, does that in that's
[56:31]
about 38,000. Does that include the
[56:34]
payments to the performers?
[56:36]
>> Yes, that's the majority of that is
[56:38]
artist fees.
[56:38]
>> Yeah. Okay. And then the um the payroll
[56:41]
would be whatever you're paid and the um
[56:45]
the 9,000 for the um
[56:47]
>> Correct. Yeah. Because that is just the
[56:49]
portion of work she does related to the
[56:51]
theater.
[56:52]
>> Yeah. and not to the the gallery.
[56:54]
>> Okay. So then the um in terms of
[56:57]
figuring out without it uh the theater
[57:01]
revenue that would be mostly ticket
[57:03]
sales, a little bit of concession, any
[57:05]
merchandise that's sold and um things
[57:08]
like that. So uh in terms of increasing
[57:11]
that so that that would cover
[57:14]
>> um your position.
[57:15]
>> Yes. Yeah. Exactly.
[57:16]
>> That would be the ideal.
[57:17]
>> Correct. And so if I could just speak a
[57:19]
little bit further to that and give you
[57:20]
some granular information. So, you know,
[57:22]
it's really important to us uh to as the
[57:24]
pack to ensure that there's programming
[57:26]
for everybody and that there's ticket
[57:28]
prices that are accessible. So, that was
[57:30]
sort of this one year that we've just
[57:31]
done. We are programming the same level
[57:33]
into next year. However, the the concept
[57:36]
of this headliner, these headliner
[57:38]
shows, just to give you an idea, if we
[57:40]
could hold four or five Dan Mangan level
[57:42]
shows a year, that will offset almost
[57:44]
the full cost of the grant for the
[57:46]
position. So
[57:49]
Boweners will always have full. So for
[57:51]
example, when Dan Mangan tickets were
[57:53]
released, they were released on Bowen
[57:55]
Island first. They sold out on Bowen
[57:57]
Island. We did not release them to the
[57:58]
mainland. We release them to Boweners
[58:00]
first. So the idea with this headlining
[58:03]
group, these headlining acts, is we do
[58:05]
that first. It's a benefit to the
[58:06]
community. If the community, if the
[58:08]
ticket price is something the community
[58:09]
won't bear, a 6070 $80 ticket for for
[58:13]
quite a well-known name performer, these
[58:16]
performers will be able to draw from the
[58:17]
mainland. There's no question in our
[58:19]
mind that this programming will sell
[58:20]
out. And as long as it sells out, we
[58:23]
know we're in a revenue position.
[58:24]
Thankfully, I've had a year to track
[58:26]
finances. I didn't have anything to go
[58:27]
on because we didn't have programming.
[58:29]
So, I've granularly tracked every
[58:31]
expense related to every show. And we
[58:33]
feel really confident with this approach
[58:35]
moving forward. We hope that it will
[58:37]
offset at least the majority of the
[58:39]
position. Um, you know, we would like to
[58:41]
ensure that we can we're self-
[58:42]
sustaining. So, you know, we just need
[58:44]
another year to to be able to work
[58:46]
towards that. So, so yeah, to your
[58:48]
point, we are focused exactly where you
[58:50]
are, Judy, in making sure that this
[58:51]
position can pay for itself.
[58:52]
>> Great. And with respect to the grants,
[58:55]
the other grants. So if if BIM is
[58:58]
included in your grant revenue line, the
[59:01]
whatever 4040 I think it was, then um
[59:04]
the other grants from BC Arts and and um
[59:08]
I can't remember the you had two or
[59:09]
three that you were
[59:10]
>> those are regular and you've been the
[59:12]
hearth has been getting those maybe not
[59:15]
for performing arts, but the I mean
[59:17]
that's fairly secure right now as far as
[59:20]
grants go.
[59:21]
>> I didn't mention the BC Arts Council. Um
[59:24]
that one is secure. That's an operating
[59:26]
grant. That's correct. I didn't mention
[59:28]
it because it's an operating grant. So
[59:30]
BC Live, Creative BC, and Canadian Arts
[59:33]
Presentation Fund are not operational
[59:36]
grants and so they are performing arts
[59:38]
specific and only began with the
[59:40]
initiation of the Bowen Theater.
[59:42]
>> Right. But in terms of their
[59:44]
availability and our um ability to to
[59:49]
get those, that's fairly steady and
[59:52]
secure.
[59:54]
[laughter]
[59:55]
Is that possible to say with grants
[59:59]
>> to the two that we um I think BC live I
[1:00:03]
feel I mean I I don't want to give us a
[1:00:05]
you know a negative um omen thing but um
[1:00:08]
I think BC Live we have a secure
[1:00:10]
position and we keep delivering what we
[1:00:12]
say we will creative BC it's our first
[1:00:14]
year and we've offered them free tickets
[1:00:16]
to the Dan Mangan show to help uh
[1:00:19]
nourish nurture that relationship and
[1:00:22]
the Canadian Arts Presentation Fund with
[1:00:24]
Canadian Heritage. We have not cracked
[1:00:26]
it yet. We had a positive response. It's
[1:00:29]
the one that they want to see more
[1:00:31]
national representation to think that
[1:00:33]
we're part of the national conversation.
[1:00:36]
That's because it's a Canadian heritage
[1:00:38]
federal organization.
[1:00:39]
>> And just to be clear, none of these
[1:00:41]
grants pay for the programming and
[1:00:43]
production manager position, right?
[1:00:44]
>> They're all related to artists artist
[1:00:46]
fees.
[1:00:47]
>> Um Yeah.
[1:00:49]
>> Which is the big theater expense. Okay.
[1:00:52]
So in terms of sustainability of the
[1:00:54]
position which has been fabulous and
[1:00:57]
it's you know very very essential in
[1:01:00]
terms of getting this kind of program um
[1:01:02]
both with respect to all of the work
[1:01:04]
that the performing arts committee is
[1:01:06]
doing to support that but all of the
[1:01:08]
work that you've been doing in in terms
[1:01:11]
of making that sustainable it seems to
[1:01:13]
me that we can't necessarily rely on the
[1:01:16]
grants although they help pay for
[1:01:18]
farmers but we do have to figure out how
[1:01:20]
to get the revenues is up.
[1:01:23]
>> Yeah. And it's and it's the head it's
[1:01:25]
this headlining approach that we're
[1:01:27]
taking. And we're in conversations right
[1:01:28]
now because of the fact that none of
[1:01:30]
them are contracted. I can't share the
[1:01:32]
names with you, but they were all Dan
[1:01:33]
Bangan level. And for those that
[1:01:35]
attended the show on Saturday night, you
[1:01:37]
know, Asabi is a four-time Juno Award
[1:01:39]
winner who headlined the Folk Fest in
[1:01:41]
Vancouver and here he is performing for
[1:01:44]
179 people on Bowen Island a week later.
[1:01:47]
So, you know, we feel the other thing
[1:01:49]
that we're we're really doing is um you
[1:01:51]
know, we care about artists a great
[1:01:53]
deal. Uh most of our organizations
[1:01:55]
volunteers are artists themselves in
[1:01:57]
their own right. And I think that the um
[1:01:59]
artistic community in Canada is getting
[1:02:01]
to know us. We're dealing with agents,
[1:02:03]
major agents across the country. And I
[1:02:06]
think people are really starting to twig
[1:02:07]
that this is a very cool place to to
[1:02:09]
come and perform and that the support is
[1:02:10]
really here. So I feel like the momentum
[1:02:12]
is on our side, Judy, when it comes to
[1:02:15]
programming in a way that will be
[1:02:17]
financially remunerative.
[1:02:18]
>> Yeah, we're going to have to start maybe
[1:02:20]
not this council, but we're going to
[1:02:21]
have to start talking about budget. So,
[1:02:24]
you know, if there's if it's not
[1:02:26]
sustainable and keep in terms of keeping
[1:02:28]
$35,000 in our budget for that position,
[1:02:32]
then the $2,000 profit has to increase
[1:02:35]
considerably and that's absolutely
[1:02:37]
that's going to be ticket sales.
[1:02:38]
>> Absolutely.
[1:02:39]
a realistic discussion in terms of, you
[1:02:42]
know, whether or not this is going to be
[1:02:44]
limited to a two two-year term or
[1:02:47]
whether or not council, the future
[1:02:49]
council is going to have to consider,
[1:02:51]
you know, do we want to support this
[1:02:53]
program and if so, why?
[1:02:54]
>> Yeah. And I will tell you that our hope
[1:02:56]
is that we greatly offset it. Yeah.
[1:02:58]
>> That if we come back to council for year
[1:02:59]
three, it would be for a significantly
[1:03:02]
lower amount
[1:03:04]
>> um just to support the the growth of the
[1:03:06]
program. So that is where our focus is
[1:03:08]
and uh again after a year of finance we
[1:03:11]
now have we now have data financial data
[1:03:13]
which really really helps us when it
[1:03:14]
comes to to programming and planning.
[1:03:16]
>> And councelor Jurgensson has his hand
[1:03:19]
up.
[1:03:20]
>> Press the Andy.
[1:03:22]
>> Hi. Uh this is not a question councelor
[1:03:24]
Morris but uh I just wanted to let you
[1:03:26]
know uh I've been here since the
[1:03:29]
beginning of the meeting but not been uh
[1:03:32]
doing well and I'm going to have to step
[1:03:33]
away from the meeting. [gasps and sighs]
[1:03:36]
>> [clears throat]
[1:03:36]
>> Thank you.
[1:03:37]
>> And lower.
[1:03:41]
» Any more questions? Well, thank you for
[1:03:43]
your presentation. That was very, very
[1:03:45]
interesting. And the agenda item on uh
[1:03:48]
renewing the contract is uh coming up
[1:03:51]
under the consent agenda.
[1:03:52]
>> Wonderful. Thank you so much for your
[1:03:54]
time.
[1:03:54]
>> Thank you all.
[1:03:57]
» Okay.
[1:04:01]
» Given that we're now on to the consent
[1:04:03]
agenda. Is there anything anybody wants
[1:04:05]
to pull? Councelor Getty.
[1:04:08]
>> Um 12.3 and 12.5, please.
[1:04:14]
Anybody else?
[1:04:20]
Give you a minute to shuffle the pages.
[1:04:23]
All right, that's it.
[1:04:26]
Okay.
[1:04:31]
» I didn't pull anything. Um okay so um we
[1:04:36]
will deal with 12.3 then
[1:04:39]
>> 12.3 is a letter from the islands trust
[1:04:42]
to the minister of uh jobs and economic
[1:04:45]
growth rather kalan and uh it's
[1:04:48]
supporting an upgrade of the um
[1:04:53]
oh what is it the islands trust no
[1:04:56]
island's coastal economic trust IC tea
[1:05:00]
and um I we're part of the islands
[1:05:02]
trust. So, we're signitories to this
[1:05:05]
underneath the chairman or the chair and
[1:05:09]
but I would I was wondering whether or
[1:05:11]
not because the map for ICE tea
[1:05:13]
specifically goes around Bowen and we're
[1:05:17]
part of the trust but we're not um we're
[1:05:20]
carved out of this ic tea whether or not
[1:05:22]
we want to renew and emphasize that it
[1:05:26]
would be extremely wonderful for us if
[1:05:28]
we could be part of this um economic
[1:05:30]
trust. um they do have excellent funding
[1:05:33]
and um they do have excellent programs
[1:05:36]
that we could um quite happily
[1:05:39]
participate in. So I'm wondering if we
[1:05:42]
want to supplement and augment this in
[1:05:44]
terms of asking the minister again to
[1:05:47]
consider um a slight amendment to their
[1:05:51]
map to include Bowen Island.
[1:05:54]
Um we have had grants from ICT
[1:05:58]
>> and we have had we've had to get
[1:06:01]
permission to apply but we've not had a
[1:06:03]
problem but um it's an ongoing thing.
[1:06:06]
So, I guess if you want to make a motion
[1:06:08]
that we
[1:06:09]
>> All right. Then I would move that um
[1:06:13]
staff draft a letter to Minister Kalan
[1:06:17]
uh or the Minister of Jobs and Economic
[1:06:19]
Growth um to uh
[1:06:23]
supplement the letter from Islands Trust
[1:06:25]
dated July the 9th, 2026 to um request
[1:06:31]
that the uh map of the Island Coastal
[1:06:35]
Economic Trust be
[1:06:38]
amended to include Bowen island. So, we
[1:06:41]
have many of the same needs and features
[1:06:44]
and uh interests as all of the other
[1:06:46]
islands in the west. And
[1:06:47]
>> are you wanting all of that last bit in
[1:06:49]
the motion?
[1:06:50]
>> Sorry. Okay.
[1:06:51]
>> Okay.
[1:06:53]
Um seconder.
[1:06:55]
Is there any further discussion?
[1:06:59]
All in favor?
[1:07:01]
>> I
[1:07:04]
» And Alex Councelor Jurgensson left the
[1:07:07]
meeting, right? So, yeah.
[1:07:08]
>> Okay. Thank you. Okay. 12.4.
[1:07:12]
>> 12.5.
[1:07:13]
>> 12.
[1:07:14]
>> Oh, I'm sorry. I thought you said 12.
[1:07:16]
Oh, sorry. 12.
[1:07:17]
>> This is a letter from um
[1:07:20]
Sue Rickett uh to um mayor and council
[1:07:24]
asking for reconsideration of the uh
[1:07:28]
fires smart bin that was uh out of the
[1:07:31]
um
[1:07:32]
>> fire hall number two. hall and um how
[1:07:35]
useful it was to uh lots of members of
[1:07:38]
the community. Um, and I think what's
[1:07:41]
happened is that it may be more
[1:07:42]
complicated than just having people put
[1:07:45]
um
[1:07:47]
un well there was garbage that was put
[1:07:50]
in with the green waste and u the I
[1:07:53]
think the excuse that was made public
[1:07:55]
was that that had contaminated it so
[1:07:57]
that um it was not accepted by the um
[1:08:01]
recycling. But I think it might be a
[1:08:04]
little bit more complicated in terms of
[1:08:06]
funding sources and um the amount of
[1:08:09]
time and energy that it took. So, I
[1:08:12]
would like staff to investigate um and I
[1:08:16]
um I meant to mention this, ask Carla
[1:08:19]
whether or not this was possible in
[1:08:20]
terms of our um environmental um
[1:08:24]
planning to see what the barriers would
[1:08:27]
be and then the feasibility of us um
[1:08:29]
somehow working with funding sources and
[1:08:33]
um other people in the community to
[1:08:35]
reinstate this because it is a really
[1:08:37]
good service. So, um, I've being living
[1:08:40]
out in that side of the island, I
[1:08:42]
actually did inquire and the problem was
[1:08:46]
people were contaminating the container.
[1:08:49]
And I know from our strata, having
[1:08:52]
gotten a container once, they will not
[1:08:54]
accept it at the recycling at the um,
[1:08:57]
transfer station if it's got anything
[1:09:00]
other than green waste in it.
[1:09:01]
>> Y,
[1:09:02]
>> so that was the problem that it was
[1:09:05]
being contaminated. So,
[1:09:06]
>> well, I had a very brief conversation on
[1:09:10]
the street with um Steven and he sort of
[1:09:13]
said that there were other problems as
[1:09:14]
well, but I didn't get into what those
[1:09:16]
were.
[1:09:17]
>> So, um it would be interesting to follow
[1:09:20]
up and see whether or not we
[1:09:21]
>> what the barriers would be to reinstate
[1:09:24]
this.
[1:09:26]
>> Okay. So,
[1:09:28]
can you
[1:09:29]
>> um I'd also just like to add to that the
[1:09:31]
funding source for this is of limited
[1:09:33]
time. It's coming from the fires smart
[1:09:35]
grant which should provide funding
[1:09:36]
through till about the month of March
[1:09:38]
next year. So um the fact that it was
[1:09:41]
pulled back was um yeah dumping of a lot
[1:09:44]
of construction waste drywall and things
[1:09:46]
which is absolutely uh rejected by the
[1:09:50]
land transfer station not from only the
[1:09:52]
green waste but from the garbage itself.
[1:09:54]
So, unfortunately, it's an unmonitored
[1:09:56]
bin and um it was uh not respected by
[1:10:01]
certain people in the community and
[1:10:02]
we're just not able to put a bin out
[1:10:05]
there that's not monitored and and we've
[1:10:07]
had to pull it back. Um, additionally,
[1:10:10]
as I said, the funding for this service
[1:10:11]
would have run out by the end of March.
[1:10:16]
» So, do you want to move receipt of the
[1:10:18]
letter?
[1:10:19]
>> No. I'd like staff to to investigate
[1:10:22]
whether or not there's another place for
[1:10:23]
it or there's some way of you know to
[1:10:25]
get it monitored or to uh figure out if
[1:10:28]
there's other funding sources so that uh
[1:10:31]
and if it's not a huge uh
[1:10:34]
amount that whether or not we include it
[1:10:36]
in the tax base
[1:10:39]
it's you know instead of our recycling
[1:10:41]
or the green waste recycling we've got a
[1:10:43]
bin so drop in the
[1:10:46]
>> a motion along the lines of um council
[1:10:49]
request staff to look into providing a
[1:10:53]
green bin in a more secure location.
[1:10:56]
>> Okay, thank you. I'll move that
[1:11:00]
sec. Anybody want to second that?
[1:11:06]
All in favor?
[1:11:08]
Okay.
[1:11:12]
Um,
[1:11:13]
so back to the motion to approve the
[1:11:16]
consent agenda. Council
[1:11:26]
fast.
[1:11:28]
>> Uh, I thought Judy had her hand up
[1:11:30]
first. I was going to second.
[1:11:31]
>> Oh, okay.
[1:11:32]
>> Others.
[1:11:35]
>> Okay. So, the motion is that council
[1:11:37]
approve the items as outlined in the
[1:11:38]
July 27th, 276 regular council meeting
[1:11:42]
agenda.
[1:11:43]
>> Consent agenda. Yes.
[1:11:44]
>> Consent agenda. Yeah. Okay. So if Judy
[1:11:47]
moves it. Okay. Moved by councelor
[1:11:49]
Getty, seconded by councelor Fast. All
[1:11:51]
in favor? I.
[1:11:54]
>> Okay. So that skips us right through to
[1:12:00]
Is the hearth still here? Because their
[1:12:01]
programming funding just got approved.
[1:12:05]
Okay, we are down to new bits. Where are
[1:12:08]
we? Too many pages.
[1:12:11]
Bylaws 7.1
[1:12:16]
» 1639 Mount Gardener Road.
[1:12:24]
» Thank you, council. Um, sorry, a quick
[1:12:26]
technical issue. Uh, didn't realize what
[1:12:28]
presenting in person that be affected by
[1:12:30]
the new Zoom rules. So, if I can be led
[1:12:31]
into the meeting, I'll be able to screen
[1:12:33]
share. If not, I got the presentation
[1:12:34]
saved in uh council for if you could
[1:12:37]
open that up.
[1:12:38]
>> Oh, you've got a PowerPoint you want to
[1:12:39]
present? Yeah. Yeah. Okay. I can run the
[1:12:41]
presentation.
[1:12:42]
>> Okay. Thanks so much. Doesn't matter
[1:12:43]
what uh speed up until you get to
[1:12:45]
propose conservation areas. Then just
[1:12:46]
sit there and I'll let you know.
[1:12:55]
» I'm just getting it up here.
[1:12:56]
>> Sorry about that.
[1:12:58]
>> You just have to remember to remind for
[1:13:00]
[clears throat] prompting turning pages.
[1:13:02]
>> Yeah. Yeah, for sure.
[1:13:06]
Perfect.
[1:13:17]
So, like I said, it doesn't matter how
[1:13:18]
fast it go till the proposed
[1:13:19]
conservation area.
[1:13:22]
So, thank you. Uh, so this report is to
[1:13:24]
present the amending bylaw for first
[1:13:26]
reading to amend the zoning of 1658
[1:13:28]
Mount Gardner Road for the purpose of
[1:13:30]
establishing a smaller lot size and
[1:13:31]
allowing this land to be subdivided from
[1:13:34]
1639 Mount Gardner Road. So the bylaw is
[1:13:36]
attached as by number 723 20226 and it
[1:13:39]
will reszone the property to a new zone
[1:13:41]
variation called SR2F.
[1:13:44]
So a new item that's committed to
[1:13:45]
support this application u is a plan of
[1:13:47]
proposed conservation areas prepared by
[1:13:50]
Michael Florendo uh to satisfy the
[1:13:52]
nature needs half requirement of the
[1:13:54]
conservation development policy. So
[1:13:56]
there are two conservation areas that
[1:13:57]
are proposed u that are they're the most
[1:14:00]
densest and most undisturbed areas of
[1:14:01]
forest in the property. Um there's
[1:14:03]
they're only separated by an access
[1:14:05]
easement that also prohibits
[1:14:06]
development. So essentially it is one
[1:14:08]
big no development area. Uh the largest
[1:14:10]
pond on the property as well as multiple
[1:14:12]
water courses will be captured uh within
[1:14:14]
that conservation area.
[1:14:16]
Um the total area proposed for
[1:14:18]
conservation is 25,400 m. That's
[1:14:22]
equivalent to 47% of the property. Uh
[1:14:24]
but combined with the that access
[1:14:26]
easement I mentioned uh which already
[1:14:28]
prohibits development. So the amount of
[1:14:30]
the property under protection from
[1:14:31]
further development will be 50%. So
[1:14:34]
meeting the nature needs half.
[1:14:36]
Um of note the conservation area will
[1:14:40]
include a rock cliff/outcrop in the
[1:14:43]
southwest area of the the lot. Um
[1:14:46]
uh sorry if you can flip forward uh one
[1:14:49]
or two. One more. Perfect. Thanks much.
[1:14:52]
Um, so those areas are considered
[1:14:55]
important as nesting sites for bats as
[1:14:57]
well as snakes and lizards to shelter
[1:14:58]
over winter. And then combined with the
[1:15:00]
nearby pond, uh, that which attracts
[1:15:02]
insects that bats and birds then feed
[1:15:04]
on. This means that the conservation
[1:15:05]
area will provide habitat, feeding
[1:15:07]
grounds, and more for a variety of
[1:15:08]
species. Um, next slide.
[1:15:12]
And there's one more finding since
[1:15:14]
writing this report that I need to share
[1:15:15]
with council, which is to confirm the
[1:15:17]
status of the roadway, which bisects
[1:15:18]
lease Kummenuk's property. Uh so what's
[1:15:20]
shown on bow maps is not correct and the
[1:15:22]
legal plan is not saved with the land
[1:15:23]
titles authority but now that I've
[1:15:25]
managed to find that plan and it
[1:15:26]
confirms that this roadway is in fact
[1:15:28]
private property. It belongs to the
[1:15:30]
adjacent property to the west. Uh if you
[1:15:32]
want to go to the next slide uh you can
[1:15:34]
there you can see the the large property
[1:15:36]
on the west. So that's what it belongs
[1:15:37]
to. Um
[1:15:41]
so then yeah then there are municipal
[1:15:42]
eastments that provide access to lease's
[1:15:44]
property as well as to the adjacent
[1:15:45]
neighbors. Um so my apologies to bring
[1:15:47]
us up now. uh this but this will not
[1:15:49]
affect the main staff recommendation.
[1:15:51]
Instead, it does affect the first of the
[1:15:52]
alternative recommendations. Um go go to
[1:15:55]
the next slide there. Uh so the um in
[1:16:00]
the report that that alternative stated
[1:16:03]
the council will seek a public beach
[1:16:04]
access as well as a public trail right
[1:16:06]
away for access to the crownlands as
[1:16:08]
well as a rightaway for the water line
[1:16:10]
crossing Mount Carter Road. So instead
[1:16:12]
with that that strip being private
[1:16:13]
property, that last item about the water
[1:16:15]
line is no longer necessary. However,
[1:16:16]
there would be an additional easement
[1:16:18]
needed for the public beach access. Uh
[1:16:20]
so that's alternative number one would
[1:16:23]
now read um that council directs staff
[1:16:26]
to seek a public beach access as well as
[1:16:28]
a public right of way leading to it. Uh
[1:16:30]
in addition to a public trail right
[1:16:32]
ofway for access south to the crown
[1:16:34]
lands and a new right ofway access to
[1:16:36]
1658 mountainer road the proposed lot as
[1:16:39]
a condition of approval.
[1:16:41]
Um and go to the next slide. So
[1:16:43]
ultimately staff feel that this resoning
[1:16:45]
request is low impact but that the
[1:16:47]
municipality stands to gain valuable
[1:16:48]
environmental protections and a possible
[1:16:50]
trail connection. Uh staff recommend
[1:16:52]
that bylaw number 723 20226 is read a
[1:16:55]
first time and that the bylaw and policy
[1:16:56]
checklist are referred to the islands
[1:16:58]
trust. Thank you.
[1:17:01]
>> Do we have any questions for the planner
[1:17:04]
councelor Fast and Councelor Getty?
[1:17:07]
>> Um thank you. That's really interesting
[1:17:09]
to know about the that it's a private
[1:17:11]
road uh there. So if uh public beach
[1:17:15]
access was to be proposed
[1:17:18]
uh would it
[1:17:20]
would the municipality need to arrange
[1:17:23]
that through another property owner?
[1:17:28]
>> It looks that way. That's that's
[1:17:29]
correct. Yeah.
[1:17:30]
>> Okay. Uh thank you. And then um uh just
[1:17:35]
confirming that that's all
[1:17:38]
uh shoreline is public below the high
[1:17:40]
tide line.
[1:17:41]
>> That's correct.
[1:17:42]
>> Okay. There's no crown strips or
[1:17:44]
anything around there?
[1:17:44]
>> No.
[1:17:45]
>> Okay. Thank you,
[1:17:48]
Council Getty.
[1:17:49]
>> So the public access um or sorry the
[1:17:52]
trail that is marked in the in between
[1:17:55]
the two um proposed
[1:17:58]
um ecological
[1:18:00]
protected areas. Is there any way that
[1:18:03]
the municipality can put a covenant on
[1:18:06]
that trail so that it is not I mean it
[1:18:09]
may become part of the public trail
[1:18:10]
system but can we do anything in terms
[1:18:14]
of motorized vehicles at this point so
[1:18:17]
that it if it's between two protected
[1:18:19]
areas that it not have that kind of
[1:18:22]
traffic through it. Is there any way we
[1:18:25]
can
[1:18:26]
>> Good question. Um I would want to reread
[1:18:28]
that easement. Uh I can't recall off the
[1:18:30]
top of my head if it was if if so so
[1:18:32]
basically what that easement uh allows
[1:18:34]
access to is some further further lots
[1:18:36]
down to the southwest and I can't recall
[1:18:38]
off the top of my head if it was
[1:18:39]
motorized access or by foot probably
[1:18:41]
motorized because that's a long ways to
[1:18:42]
go. Um so yeah I would have to review
[1:18:45]
that the the implications of that if if
[1:18:47]
we can stack something on top of that would kind of supersede that in
[1:18:50]
terms of it preventing motorized
[1:18:51]
vehicles. Yeah, I'll have to look into
[1:18:53]
that further. So that's an access
[1:18:55]
easement between
[1:18:58]
the property owner on and another
[1:19:01]
property to the other side.
[1:19:02]
>> That's correct.
[1:19:03]
>> Okay. So it's a different access
[1:19:06]
counselor fast.
[1:19:08]
>> Uh is that the [clears throat] same
[1:19:10]
property beyond that also owns the road?
[1:19:14]
>> No. Uh though the one the one that this
[1:19:17]
roadway is part of is directly to the
[1:19:18]
west whereas this trail leads to the one
[1:19:21]
to the southwest.
[1:19:22]
>> Yes.
[1:19:23]
Thank you. I have um um I have comments
[1:19:27]
about alternative number one which I
[1:19:30]
would like to move. So, thank you for
[1:19:32]
adjusting the wording, but when you get
[1:19:34]
when you're ready
[1:19:35]
>> when you're ready.
[1:19:36]
>> Um did were you able to put up the um to
[1:19:40]
get the um map the b the bow map ortho
[1:19:46]
map up?
[1:19:47]
>> I have it up on my computer and then
[1:19:49]
sorry I didn't put it on the slide. I
[1:19:51]
didn't didn't uh foresee this issue with
[1:19:53]
me not connecting. Um
[1:19:57]
is there any way we can go and bow map
[1:19:58]
and zoom in there? Sorry about that,
[1:19:59]
guys.
[1:20:02]
>> So, you'd like me to pull up the bow
[1:20:03]
map? Um
[1:20:05]
>> yeah, maybe if if um corporate officer
[1:20:08]
could pull up bow map and type in the uh
[1:20:12]
address. It's 1639, right?
[1:20:15]
>> 1658.
[1:20:17]
Okay.
[1:20:19]
>> Working on it.
[1:20:22]
We'll give the
[1:20:24]
members of the public a demonstration of
[1:20:26]
bow map that for those that haven't used
[1:20:28]
it. Okay. And then when you go on the
[1:20:30]
layers, click on or
[1:20:34]
now. Click on oro
[1:20:40]
» and then if you just turn on the Oh, you
[1:20:42]
got it.
[1:20:42]
>> There we go. So, um I'm asked to have
[1:20:47]
this put up because there is already a
[1:20:49]
public beach access on the um I guess
[1:20:53]
it's on everybody's left um beside the
[1:20:56]
public dock that we already can use at
[1:20:59]
Mount Gardener. And you can see that
[1:21:02]
there is a fair amount of sand and nice
[1:21:04]
little access on that beach. So, um, and
[1:21:08]
given the planner's comments about the,
[1:21:10]
um, if we turned on the contours layer,
[1:21:13]
you would see how steep and difficult
[1:21:16]
any sort of beach access would be there
[1:21:19]
and very expensive to build. And the
[1:21:22]
other is because there is no um, parking
[1:21:26]
or anything around there, that's an
[1:21:27]
impossibility as well. It's not
[1:21:29]
something that would be a destination
[1:21:31]
beach and all the local neighbors can
[1:21:33]
walk to and get to a beach right now.
[1:21:37]
So, I'm certainly not in favor of the
[1:21:40]
option number one.
[1:21:44]
Councor Fast, thank you. Um, if I can
[1:21:48]
speak to option number one. Um, and if
[1:21:52]
maybe if you could u bring that up on
[1:21:54]
the screen. um Sophie from the planner's
[1:21:58]
presentation,
[1:22:00]
he had revised wording for alternative
[1:22:03]
number one. And [clears throat] uh so
[1:22:05]
I'm going to speak to why I still think
[1:22:08]
it's worth uh creating a safer uh public
[1:22:12]
access to the beach. Um, right now, as
[1:22:15]
uh, councelor Morris has pointed out,
[1:22:17]
there is public access. If you go down
[1:22:21]
beside the Mount Gardener dock, uh,
[1:22:23]
where the boats are stored and, um, uh,
[1:22:26]
and across the rocks, you can get out to
[1:22:29]
the, um, beach. Um, and, uh, it's
[1:22:33]
slippery rocks. It's not the safest. I
[1:22:36]
have to confess I haven't swam there so
[1:22:38]
I can't remember uh exactly but I'm
[1:22:41]
pointing I'm looking at um the islands
[1:22:44]
trust uh directives checklist and number
[1:22:47]
5.5
[1:22:49]
which I see on I I believe in your uh
[1:22:53]
checklist doesn't have a check mark
[1:22:55]
there it says um local trust committees
[1:22:57]
and island municipalities shall in their
[1:22:59]
official committed plans and regulatory
[1:23:00]
bylaws which this would be as a resoning
[1:23:03]
it's changing in our land use bylaw.
[1:23:07]
Right. Okay. Um address the uh
[1:23:11]
identification of sites providing safe
[1:23:13]
public access to beaches, the
[1:23:15]
identification and designation of areas
[1:23:17]
of regional significance da and um
[1:23:20]
locations for community and public boat
[1:23:22]
launches, docks and anchorages as well.
[1:23:25]
So mostly I think the Mount Gardner dock
[1:23:28]
public access is used for uh boats and
[1:23:31]
people to go out on the docks and um I'm
[1:23:34]
not sure and and to store their private
[1:23:38]
uh little boats under the docks and uh
[1:23:41]
access the water that people do, but I'm
[1:23:44]
not sure that I've ever seen swimmers
[1:23:45]
there. And uh I'm not sure how much it's
[1:23:47]
used and I'd like to uh investigate
[1:23:50]
that. I note in the parks plan uh which
[1:23:54]
is also not referred to in the planners
[1:23:56]
uh comments. Maybe it was in your
[1:23:58]
earlier uh report. I don't know. Um but
[1:24:00]
it speaks to the official community plan
[1:24:03]
includes recommendations to guide the
[1:24:05]
development of municipal parks, trails,
[1:24:06]
and beach areas on Bowen. Parks plan
[1:24:09]
expands on this. And I won't go into
[1:24:12]
huge detail, but just to um mention that
[1:24:15]
some of the goals on the park's plan are
[1:24:19]
uh promote walking, hiking, cycling,
[1:24:21]
horseback riding, and trail. We're
[1:24:23]
talking about trails. Um and this is a
[1:24:26]
publicly maintained, taxpayermaintained
[1:24:28]
road up until this lot. I thought it was
[1:24:32]
all the way along, but apparently not.
[1:24:35]
Uh up to the edge of uh this resoning.
[1:24:39]
Correct. Yeah. Okay. And um so uh across
[1:24:44]
the island to facilitate commuting uh
[1:24:46]
access and um uh recreation. Uh number
[1:24:51]
three goal is beaches and uh so there's
[1:24:54]
three goals there about all ages and
[1:24:56]
opportunities to experience the islands
[1:24:58]
beaches protect shoreline da da da da um
[1:25:01]
support non-motorized water-based
[1:25:03]
recreational opportunities. And then um
[1:25:06]
goal f four is to acquire beach
[1:25:09]
accesses. And uh this one I wanted to uh
[1:25:12]
point out doesn't come often this
[1:25:15]
opportunity to acquire a beach access.
[1:25:18]
And um [clears throat] I think that um
[1:25:21]
some homeowners in this uh area,
[1:25:25]
including the prospective uh private lot
[1:25:29]
uphill,
[1:25:30]
um might like to walk down to the beach
[1:25:33]
and uh swim at some point in the future.
[1:25:36]
Um people on Bowen enjoy swimming. I
[1:25:39]
think it's worth exploring um these
[1:25:42]
ideas that are in our uh major guiding
[1:25:45]
documents and um uh and the idea of
[1:25:49]
safer public access to beaches. I think
[1:25:52]
people swim from the Mount Gardener
[1:25:54]
dock, which I don't know how safe that
[1:25:56]
is, and those slippery um rocks going
[1:26:00]
down to the water um below the Mount
[1:26:03]
Gardener dock. Um,
[1:26:05]
having watched my uh some family members
[1:26:08]
sort of teetering on the top of them,
[1:26:11]
um,
[1:26:13]
I'm I think a safer uh public beach
[1:26:16]
access um at a lower uh that's easier to
[1:26:21]
get down to the water uh might be
[1:26:23]
worthwhile. And uh so I just wanted to
[1:26:26]
um suggest that it might add uh be
[1:26:30]
something that other property owners
[1:26:32]
around in the neighborhood might enjoy,
[1:26:34]
particularly if they've got um dock
[1:26:37]
that's going to take several years to
[1:26:39]
replace or something like that. They
[1:26:41]
want to get down to the water. Uh of
[1:26:42]
course there's the Mount Gardner dock um
[1:26:46]
beach access, but it's my
[1:26:48]
feeling that that's getting busier with
[1:26:50]
smaller boats and people coming and
[1:26:52]
going. So, I um I just uh would like to
[1:26:55]
move the motion that's on um
[1:26:59]
the screen as the alternate one. I move
[1:27:03]
that council direct staff to seek seek a
[1:27:06]
public beach access as well as public
[1:27:08]
right ofway leading to it from Mount
[1:27:10]
Gardner Road in addition to a public
[1:27:13]
trail right ofway for access south to
[1:27:16]
the crownlands and a new right ofway
[1:27:18]
access to 1658 Mount Gardner Road as a
[1:27:22]
condition of approval.
[1:27:25]
>> Have a question.
[1:27:28]
Council Getty
[1:27:30]
>> um before this gets um seconded and we
[1:27:32]
have a discussion on that motion. The
[1:27:35]
recommendation that was in the agenda
[1:27:37]
was to have first reading and refer that
[1:27:41]
to the trust with the checklist. So does
[1:27:44]
this motion to have staff explore
[1:27:49]
um some other beach access and rights
[1:27:52]
away delay that process? It it would um
[1:27:56]
it could uh it could be worded that like
[1:27:59]
that could be stuck in at the end of all
[1:28:00]
those other processes so we can move
[1:28:01]
ahead with um referring the bylaw and
[1:28:05]
checklist to the island trust but also
[1:28:07]
continue working on setting up these
[1:28:08]
rightways.
[1:28:13]
[clears throat]
[1:28:14]
>> Question two,
[1:28:16]
>> um just because I'm first it's my first
[1:28:18]
time seeing this alternative text. Uh we
[1:28:21]
didn't have it before. Um,
[1:28:27]
regarding the island's trust checklist,
[1:28:30]
uh, you've got a not applicable beside
[1:28:34]
5.5 and that's because the beach access
[1:28:37]
wasn't included in the proposal that's
[1:28:39]
recommended.
[1:28:40]
>> Exactly. So, council motions on that,
[1:28:42]
then I can check because it'll now be
[1:28:44]
part of the application.
[1:28:45]
>> Thank you. Yeah. So, just so people
[1:28:46]
understand, this is just so that this
[1:28:48]
step could take place before. I just um
[1:28:51]
I had a clarifi clarification question
[1:28:53]
on the motion um and then we'll look to
[1:28:56]
see if anybody wants to second it. Um it
[1:28:58]
says in addition to a public trail right
[1:29:00]
away for access. That's already in the
[1:29:03]
proposal, isn't it?
[1:29:05]
>> Correct.
[1:29:05]
>> Okay. So basically what this motion
[1:29:08]
wants to do is is just the first um two
[1:29:11]
lines up to the comma
[1:29:14]
because the other is already covered off
[1:29:16]
in your package.
[1:29:18]
>> True.
[1:29:18]
>> Yeah. Thank you.
[1:29:19]
So, is there a second for the motion?
[1:29:21]
>> There's three. There's beach access.
[1:29:24]
There's um rightway access to 1658 Mount
[1:29:28]
Garner, and there's access south to
[1:29:30]
Crown Labs, right?
[1:29:31]
>> But those, from what I'm understanding
[1:29:33]
from the planner, are already covered
[1:29:36]
off in in the in the
[1:29:40]
>> package. Sorry, I guess only the middle
[1:29:42]
one.
[1:29:42]
>> Only only the middle one,
[1:29:43]
>> the public trail right away for access
[1:29:45]
south to crown lands. that that's
[1:29:46]
included in the applicants amenity
[1:29:48]
package. But I guess so sorry. So So
[1:29:49]
yeah, the first and third of the
[1:29:52]
uh lines there would be the ones to add.
[1:29:57]
>> Okay. So there's no access to 1658 Mount
[1:30:02]
Gardner Road in the package.
[1:30:04]
>> Uh no.
[1:30:08]
» Sorry. And but is that needed because of
[1:30:12]
the fact that the road isn't a public
[1:30:14]
road all the way along?
[1:30:15]
>> Exactly. Yeah. So they already do have
[1:30:18]
easement to uh can't remember the six
[1:30:21]
sorry can't remember the name of the
[1:30:22]
address the large portion of the south.
[1:30:24]
So at the moment this is one one legal
[1:30:26]
parcel. So they they had their legal
[1:30:28]
access but now now they'll be se severed
[1:30:30]
um and that that will be a private
[1:30:31]
roadway separating them. Yeah. Will need
[1:30:33]
public access to sorry um to get to that new northern portion 1658. So you
[1:30:39]
really have three things. So in which
[1:30:41]
case I might want to ask to have it
[1:30:43]
severed into three separate motions.
[1:30:49]
So is there a seconder for the motion?
[1:30:55]
Okay. Then I'm going to ask to have it
[1:30:57]
separate into three separate motions.
[1:31:03]
You
[1:31:03]
>> do that after it's seconded or is that
[1:31:05]
before?
[1:31:06]
>> No, you do it after.
[1:31:15]
So, we've got a motion that's moved and
[1:31:17]
seconded and separate into three parts,
[1:31:20]
which corporate officer might have a
[1:31:22]
little fun trying to do.
[1:31:47]
Okay. So, on the first clause, the
[1:31:49]
council directs staff to seek a public
[1:31:51]
beach access as well as a public right
[1:31:53]
ofway leading to it from Mount Gardner
[1:31:55]
Road.
[1:31:57]
All in favor?
[1:32:01]
Opposed?
[1:32:05]
Councelor Getty, you
[1:32:07]
>> um I'm not keeping up. So, um I've
[1:32:10]
abstained which counts as a positive.
[1:32:12]
>> You can't. Yeah. Okay.
[1:32:16]
» Okay. Um in the second one, in addition
[1:32:20]
to a public trail right away for access
[1:32:23]
south to Crown Lands,
[1:32:26]
and is that already covered in the
[1:32:28]
package now? No. Okay. So, um maybe that
[1:32:32]
so
[1:32:34]
um a public do we leave the word
[1:32:37]
addition in there if we severed it or
[1:32:40]
does it matter?
[1:32:43]
>> Um
[1:32:47]
you severed it. Okay. You're going to
[1:32:49]
put council direct staff in front of
[1:32:51]
each one. Okay.
[1:32:58]
All right. So, the council directs staff
[1:32:59]
to seek a public trail right of way for
[1:33:02]
access south to the crown lands.
[1:33:07]
All in favor?
[1:33:11]
Opposed? Nobody's here. And a new right
[1:33:16]
of way across access.
[1:33:20]
And that one you've got in your report,
[1:33:22]
right? This last one.
[1:33:24]
>> No, sorry, this is this is new. um
[1:33:27]
because we just found that uh that's a private roadway. So a need that
[1:33:31]
was identified.
[1:33:32]
>> So you need this one. The council direct
[1:33:34]
staff to seek a new rightway access to
[1:33:36]
1658 Mount Gardner Road as a condition
[1:33:38]
of approval.
[1:33:41]
>> All in favor?
[1:33:42]
>> Favor
[1:33:44]
opposed. Nobody's else is here. Okay.
[1:33:50]
All right.
[1:33:52]
So
[1:33:54]
now your main one is first reading.
[1:33:58]
>> Okay.
[1:34:00]
So would somebody like to move that
[1:34:02]
bylaw number 723 cited as mun bone
[1:34:06]
municipality land use bylaw number 57
[1:34:08]
2002 amendment bylaw number 723 2026 be
[1:34:12]
read a first time.
[1:34:15]
Second. Thank you. All in favor?
[1:34:22]
okay
[1:34:26]
» okay or carried you
[1:34:28]
>> if the staff investigate the other
[1:34:30]
rights away and it's attached to this
[1:34:33]
then does this come back with those
[1:34:36]
amendments those if they are organized
[1:34:40]
then come back as an amendment or
[1:34:41]
something
[1:34:42]
>> they go back to trust after that
[1:34:44]
>> so we'd be referring these bylaws and
[1:34:46]
checklisted on as trust and then
[1:34:48]
ultimately those those would be those
[1:34:49]
ements rightways would be a condition of
[1:34:51]
approval. So, we'd have have them set up
[1:34:52]
before this bile is ultimately adopted.
[1:34:54]
That it' only be this bio at the end of
[1:34:56]
the process would only be adopted if
[1:34:57]
those things have been secured.
[1:35:00]
>> Would that have to go back to trust?
[1:35:02]
>> No.
[1:35:02]
>> At the end of the process, um yeah,
[1:35:04]
after after uh final reading, but before
[1:35:07]
adoption, this goes back to that trust.
[1:35:09]
Yeah.
[1:35:12]
» Okay. We on to seven. We're on to 7.2
[1:35:15]
now.
[1:35:17]
>> Oh, sorry. I believe uh the the second
[1:35:20]
and third part of the motion on the
[1:35:22]
agenda uh needs to be voted on.
[1:35:26]
>> Oh,
[1:35:26]
>> so it's that that council refer by
[1:35:28]
number 7.
[1:35:29]
>> I'm sorry I didn't flip the page and
[1:35:30]
read that.
[1:35:31]
>> Did we vote on the first one?
[1:35:33]
>> Yeah, we did. And I didn't flip the page
[1:35:35]
to add um
[1:35:37]
>> the it be referred. Um, so we need to
[1:35:40]
move that council refer bylaw number 723
[1:35:42]
20226 and the attached islands trust
[1:35:44]
policy statement checklist to the
[1:35:47]
islands trust and the council direct
[1:35:48]
staff to return with the results of that
[1:35:50]
referral.
[1:35:51]
>> Can I ask a question?
[1:35:52]
>> Yeah. Um, since we've
[1:35:57]
passed this uh motion about the public
[1:35:59]
beach access be explored um number 5.5
[1:36:05]
on the trust uh directives checklist.
[1:36:08]
Would you put that in a note on there or
[1:36:10]
how does will that be included in the
[1:36:12]
referral to the islands trust?
[1:36:14]
>> I'll include it and I'll tweak the like
[1:36:15]
specifically the 5.55.5 section. I'll confirm that one when I send it to
[1:36:19]
>> Thank you.
[1:36:22]
All in favor
[1:36:24]
or do we have a mover in a second or
[1:36:28]
we it was moved and seconded.
[1:36:29]
>> It was moved and seconded. Okay. All in
[1:36:31]
favor?
[1:36:32]
>> I
[1:36:36]
thank you.
[1:36:37]
>> Okay. Now we're on to 7.2.
[1:37:20]
Eat this thing.
[1:37:36]
Are you ready?
[1:37:37]
>> Yes. Thank you, Council Mor. So, I'm
[1:37:39]
here today um to bring you um a resoning
[1:37:42]
application at 620 Laura Road and a
[1:37:44]
bylaw for consideration of first
[1:37:46]
reading. Um so, by way of background,
[1:37:49]
this is an application at 620 Laura
[1:37:51]
Road. It's at the intersection of
[1:37:52]
Westside Road and Laura Road on the west
[1:37:55]
side of Bowen Island. And the
[1:37:57]
application that is before you is to
[1:37:59]
seek the cider use at 620 Laura Road.
[1:38:03]
By way of background, this was last
[1:38:05]
before you May 25th. Um, and at that
[1:38:07]
point, we brought a revised application
[1:38:09]
to you that council referred to two
[1:38:11]
advisory committees. Um, and directed
[1:38:13]
staff to prepare bylaws to amend the
[1:38:15]
land use bylaw to allow the development
[1:38:17]
proposal and directed staff to provide
[1:38:20]
notice of first reading of the land use
[1:38:22]
um bylaw amendment bylaw as required
[1:38:24]
under section 467 of the local
[1:38:26]
government act. And that's the section
[1:38:28]
that is to provide notice in lie of to
[1:38:30]
provide notice of first reading when a
[1:38:32]
public hearing is not being held.
[1:38:35]
Um just some background on the property.
[1:38:37]
is zoned rural residential
[1:38:39]
2. Um and that allows the uses that are
[1:38:43]
allowed in all of our rural residential
[1:38:44]
zones. So that includes dwelling,
[1:38:46]
agriculture, stable, kennel. It allows a
[1:38:48]
list of accessory uses. It includes
[1:38:50]
residential guest accommodation and home
[1:38:52]
occupation.
[1:38:54]
Um and then agriculture definition is
[1:38:56]
here. It means the use of land buildings
[1:38:58]
or structures for the growing, rearing,
[1:38:59]
producing, harvesting of crops, plants,
[1:39:01]
livestock and other animals. It includes
[1:39:04]
the processing and sale of products
[1:39:05]
harvested, reared or produced on that
[1:39:07]
lot as well. Um and then in our current
[1:39:11]
OCP, this property is designated R1
[1:39:14]
rural is the designation. So this is um
[1:39:18]
this this designation is described as
[1:39:21]
including large lots that provide rural
[1:39:23]
resource value such as agriculture and
[1:39:25]
forestry and properties that have been
[1:39:27]
maintained for purposes of a rural
[1:39:28]
lifestyle.
[1:39:30]
Um and then on this page I just have a
[1:39:32]
number of objectives that are identified
[1:39:34]
in our current OCP regarding
[1:39:36]
agriculture.
[1:39:38]
Um so supporting commercial and domestic
[1:39:40]
agriculture in suitable locations and to
[1:39:42]
encourage local food production to
[1:39:44]
preserve lands that are used or or are
[1:39:47]
suitable for agriculture activity and
[1:39:50]
there's a number here. So 88 to provide
[1:39:52]
for supporting infrastructure necessary
[1:39:53]
to maintain and strengthen the
[1:39:55]
agriculture economy or encourage land
[1:39:57]
uses that are compatible with farming to
[1:39:59]
be established in conjunction with
[1:40:00]
agriculture activity. Um and so the
[1:40:03]
report um that you have goes over the
[1:40:06]
OCP our current OCP designations
[1:40:08]
concludes that this application is
[1:40:09]
consistent with the official community
[1:40:11]
plan. Um, just for context, I've
[1:40:13]
included a couple slides just on our
[1:40:14]
draft 2026 OCP, knowing we're at the
[1:40:17]
sort of in between stage where we have a
[1:40:18]
circulated draft of an updated OCP, but
[1:40:21]
not a obviously a bylaw to enact that
[1:40:23]
OCP yet. Um, but for context, that draft
[1:40:27]
um that draft would place this land
[1:40:30]
designation in the rural residential
[1:40:32]
transition designation,
[1:40:35]
um, which has roughly the same the same
[1:40:37]
densities. Um and our 2026 OCP has um
[1:40:41]
some additional policies around
[1:40:42]
agriculture. So 2.6.67
[1:40:45]
is to protect and expand existing farms
[1:40:48]
and orchards, especially heritage fruit
[1:40:50]
trees to enhance historical as historic
[1:40:52]
aspects of the island's food production.
[1:40:56]
Um okay, final one on context for this
[1:40:58]
site. Um there is a temporary use permit
[1:41:00]
on this site that was issued initially
[1:41:02]
in 2021 and then renewed in 2023. and
[1:41:05]
that is to permit cider use on the
[1:41:07]
property um with some restrictions.
[1:41:11]
[gasps]
[1:41:11]
Where we are in the overall process,
[1:41:13]
this was this application was introduced
[1:41:15]
to council in May. It was referred to
[1:41:17]
committees and I'll I'll talk about them
[1:41:18]
later and then we are here at the
[1:41:20]
presentation for first reading. Um as
[1:41:23]
currently um slated, this would get
[1:41:26]
referred to the islands trust and come
[1:41:28]
back for presentation for second and
[1:41:30]
third reading and then considered for
[1:41:31]
adoption.
[1:41:34]
All right. The parks environment climate
[1:41:35]
action committee met to do it meant to
[1:41:38]
consider this application. So they
[1:41:41]
recommended that the proponent meet
[1:41:43]
BIM's conservation development policy.
[1:41:46]
So protecting 50% or greater of the
[1:41:48]
property for conservation purposes
[1:41:50]
including using conservation covenants
[1:41:52]
to include the heritage orchard Murray
[1:41:55]
Creek riparian areas
[1:41:57]
um indicating on the map where it is.
[1:41:59]
They were seeking an assessment from a
[1:42:01]
professional hydrogeeologist
[1:42:03]
um and a registered on-site wastewater
[1:42:05]
practitioner and looking for
[1:42:07]
clarification on quantity and
[1:42:09]
composition of solid and liquid waste.
[1:42:12]
Uh and consider restriction on or a
[1:42:14]
limit on cery output
[1:42:17]
if um if dilitterious effects are
[1:42:20]
anticipated with a significant increase
[1:42:21]
in cery production. Um and then the
[1:42:24]
advisory planning commission met last
[1:42:26]
week to discuss and they provided
[1:42:27]
recommendations regarding envir
[1:42:30]
environmental waste management
[1:42:32]
assessment be required. Um they
[1:42:35]
recommended consideration of the
[1:42:36]
reasoning be deferred pending completion
[1:42:38]
of the graft and lake watershed
[1:42:39]
management plan. They wanted
[1:42:42]
consideration to
[1:42:44]
um through the conservation development
[1:42:46]
policy preserve the diversity of the
[1:42:48]
existing heritage orchard and they
[1:42:50]
recommended council should still
[1:42:51]
consider having a public hearing for
[1:42:53]
this application.
[1:42:56]
Um so then as directed by council staff
[1:42:58]
have prepared a bylaw to amend the land
[1:43:00]
use bylaw to enable this development
[1:43:03]
proposal. So it would reszone 620 Laura
[1:43:05]
Road to be in a zone variation. So R R2A
[1:43:09]
um so zone variation works by
[1:43:12]
um varying the zone in certain ways but
[1:43:14]
leaving the rest of the zoning the same.
[1:43:16]
So um this zone variation would allow
[1:43:18]
cidery as a permitted use. It would say
[1:43:20]
the cidery may not have a lounge
[1:43:22]
endorsement which is a um a thing that's
[1:43:25]
open for ceries in BC. Essentially it
[1:43:26]
functions like a restaurant would be a
[1:43:28]
lounge endorsement. M you would set
[1:43:31]
maximum floor area of the retail space
[1:43:33]
at 25 square meters which is about the
[1:43:35]
actual size of the retail area and the
[1:43:37]
maximum area of the exterior patio space
[1:43:39]
at 80 square meters which again matches
[1:43:41]
what's there on site and it would set
[1:43:43]
the same hours as as in the temporary
[1:43:44]
use permit 11:00 a.m. to 7:00 p.m.
[1:43:46]
daily.
[1:43:48]
Um and then the the bylaw itself would
[1:43:51]
include these two definitions. So the
[1:43:52]
cidery is the same definition that's in
[1:43:54]
the temporary use permit. um with the
[1:43:56]
difference being I think the temporary
[1:43:57]
use permit just says lounge area and
[1:44:00]
then we felt like if we were calling it
[1:44:01]
out as something that's not allowed we
[1:44:03]
wanted a definition so we've included a
[1:44:05]
definition of lounge endorsement as well
[1:44:07]
that matches what's from the um I think
[1:44:09]
the LCB
[1:44:14]
says um this notice was given at first
[1:44:16]
reading so within properties of 300
[1:44:18]
meters of the property it was included
[1:44:21]
in the undercurrent and on our municipal
[1:44:23]
website and so you've heard from two of
[1:44:25]
the neighbors today and we have letters
[1:44:27]
in the the package from those neighbors.
[1:44:28]
We also have letters from um people
[1:44:31]
outside of the the notice area as well
[1:44:33]
or from any person outside of the notice
[1:44:35]
area.
[1:44:38]
Um some additional staff discussions. So
[1:44:40]
water. So you'll see in your package the
[1:44:41]
Riley Cider provided a hydrogeeologist
[1:44:44]
report that was completed in 2021 as
[1:44:46]
part of the application for a permit
[1:44:48]
from Vancouver Coastal Health. And this
[1:44:50]
report um gives details on water supply
[1:44:52]
for the property. Um noting um water
[1:44:56]
coming from a surface water license for
[1:44:58]
irrigation of the orchard and an
[1:44:59]
existing well for wash water in its
[1:45:01]
commercial operations. And just noting
[1:45:04]
water is not used in the production of
[1:45:05]
the cider itself.
[1:45:08]
Um and secondly for septic. So in my
[1:45:11]
initial staff report in April, I brought
[1:45:13]
comment from Vancouver Coastal Health
[1:45:15]
and at that point the application was
[1:45:16]
for cery and guest house use and
[1:45:18]
Vancouver Coastal Health were
[1:45:20]
recommending that we seek a registered
[1:45:22]
on-site wastewater practitioner letter
[1:45:24]
of assurance for that application. So
[1:45:27]
when the applicant revised their
[1:45:29]
application, I re-referred it to Coastal
[1:45:30]
Health and asked specifically about the
[1:45:32]
recommendation and said um if this is
[1:45:34]
just for the side is that does that
[1:45:36]
recommendation still hold? So this was
[1:45:38]
the reply from Vancouver Coastal Health
[1:45:40]
saying no, they don't think a letter of
[1:45:42]
assurance from a registered on-site
[1:45:44]
wastewater practitioner is required for
[1:45:45]
this revised application and partly
[1:45:47]
noting the original um the sewage system
[1:45:51]
filing for the septic system for the
[1:45:52]
cery and that's included in your
[1:45:54]
application as well.
[1:45:57]
Uh and then finally discussion on the
[1:45:59]
conservation development policy. So
[1:46:01]
council's familiar with this policy. The
[1:46:03]
goal of the policy is a minimum of 50%
[1:46:05]
of the total land subject to the
[1:46:06]
resoning application is protected from
[1:46:08]
further development priority to be given
[1:46:10]
to protection of any identified
[1:46:11]
environmentally sensitive areas and
[1:46:13]
green space. So staff note areas of the
[1:46:16]
property suitable for protection include
[1:46:18]
riparian areas of Murray Creek and
[1:46:20]
existing farmland.
[1:46:22]
Um
[1:46:24]
yeah and I'll just say I think through
[1:46:26]
discussion with the applicant the
[1:46:27]
applicant is hesitant to encumber the
[1:46:30]
property with with covenants that would
[1:46:33]
place further restrictions on their
[1:46:35]
operations. And so one of the things
[1:46:37]
staff is looking for is direction from
[1:46:39]
council in terms of um council's desire
[1:46:41]
to seek protective covenants of riparian
[1:46:43]
area and um and the orchards.
[1:46:49]
Uh and the staff report itself lists
[1:46:51]
alternatives. So one you would see a um
[1:46:54]
a cery definition that was provided by
[1:46:57]
the applicant to better align with the
[1:46:59]
liquor distribution branch. And so that
[1:47:02]
definition um ties the cery definition
[1:47:06]
to a minimum size of orchard but not to
[1:47:08]
production from the lot. Um, so part of
[1:47:12]
the discussion from the applicant is
[1:47:14]
that this would is that the current
[1:47:16]
definition may provide incentives for a
[1:47:19]
future owner to, you know, maximize
[1:47:21]
apple production in the orchard rather
[1:47:22]
than the diversity of of apple species
[1:47:25]
in the orchard. Um,
[1:47:29]
but the flip is that the current
[1:47:31]
definition limits production to that
[1:47:33]
produced on the lot. So that may, you
[1:47:35]
know, seem like that's the goal, the
[1:47:37]
goal of it is you're you're tying it to
[1:47:39]
specific production on the lot.
[1:47:42]
Um, second alternative is, um, so
[1:47:46]
council in May directed staff to bring
[1:47:48]
this for first reading and not to a
[1:47:50]
future public hearing. So just noting as
[1:47:51]
an alternative, council can still, as we
[1:47:53]
discussed at that meeting, council could
[1:47:55]
still at this point say we want to refer
[1:47:57]
to a future public hearing following a
[1:47:58]
second reading. Um, the third
[1:48:00]
alternative is the one brought forward
[1:48:02]
by the APC. So, council could direct
[1:48:05]
staff to not pursue the proposal any
[1:48:07]
further until the Grafton Lake watershed
[1:48:08]
management plan is complete. Um, so I
[1:48:11]
think I have another report on this
[1:48:12]
agenda that notes that that's likely to
[1:48:14]
be the end of this year. And so that
[1:48:17]
just with that alternative just noting
[1:48:18]
for council um that that would mean that
[1:48:21]
TUP has expired before the graft and
[1:48:23]
lake management plan is ant anticipated
[1:48:25]
to be complete.
[1:48:28]
Um, so with all that in mind, the
[1:48:29]
recommendation from staff is to grant
[1:48:32]
first reading to the amendment bylaw to
[1:48:33]
refer the bylaw and the islands trust
[1:48:36]
policy statement checklist to the
[1:48:37]
islands trust and direct staff to return
[1:48:39]
with the results of that referral. Thank
[1:48:41]
you.
[1:48:44]
>> Any questions? Council fast, counselor
[1:48:47]
wait um just uh to confirm that the
[1:48:52]
referral to the islands trust is the one
[1:48:54]
that's in our ontable that's correct
[1:48:56]
>> package. Okay.
[1:48:58]
Thank you. Because I was going to ask
[1:49:00]
about the um agricultural uh directive
[1:49:05]
policies and uh so they're in this other one. Thank you.
[1:49:11]
>> And uh so would the wording for that be
[1:49:14]
instead of the attached
[1:49:16]
islands trust policy statement would
[1:49:18]
just say [clears throat] the island's
[1:49:19]
trust policy statement checklist in the
[1:49:21]
on table agenda or something like that.
[1:49:24]
Anyway, I'll let Sophie think about that. She's probably the one to do
[1:49:28]
that. Okay, never mind. Thank you.
[1:49:30]
>> Okay, now you've confused me. Do you
[1:49:32]
have a revised island stress checklist
[1:49:34]
in our package?
[1:49:36]
>> It's in the on table. Um,
[1:49:38]
>> okay. Cuz that that wasn't clear, I
[1:49:40]
guess.
[1:49:41]
>> The one Yeah, the one in the published
[1:49:42]
agenda was the duplicate of Mount
[1:49:44]
Gardner Road.
[1:49:47]
Sorry.
[1:49:48]
>> Um
[1:49:50]
and the other I guess is
[1:49:53]
the um definition that the applicant
[1:49:57]
wants
[1:49:59]
versus the definition you've got in the
[1:50:01]
bylaw.
[1:50:03]
Is there a comparison of those?
[1:50:06]
What's the difference? Just going back
[1:50:08]
again.
[1:50:08]
>> Yeah, I believe it's in my report. I
[1:50:11]
didn't bring here.
[1:50:14]
I'm having trouble flipping between
[1:50:16]
documents.
[1:50:21]
» Okay.
[1:50:33]
I guess I'm thinking that the liquor
[1:50:35]
distribution branch might be a better
[1:50:38]
definition just so we don't they don't
[1:50:41]
end up running a follow of them.
[1:50:46]
» This is legible. Okay. So with the
[1:50:49]
liquor distribution branch for landbased
[1:50:51]
winery requirements say 100% of the
[1:50:54]
product must be made from fruit grown or
[1:50:55]
produced in British Columbia which is in
[1:50:57]
our definition. They talk about at least
[1:50:59]
25% of the fruit used in production must
[1:51:02]
come from acreage owned or leased by the
[1:51:04]
license whereas we seek it to be on the
[1:51:07]
lot.
[1:51:08]
>> Okay.
[1:51:08]
>> And at least 2 acres of fruit orchard
[1:51:10]
must be maintained. So the difference
[1:51:12]
being that currently we would say 25% of
[1:51:15]
the fruit is produced on the lot. Um
[1:51:18]
they would not have that requirement.
[1:51:20]
Instead they would have a requirement
[1:51:21]
that they maintain 2 acres of orchard.
[1:51:27]
» Okay. Councelor Wake, I think you had
[1:51:30]
>> uh Yes. Thank you. Um so both the parks
[1:51:35]
environment and climate action advisory
[1:51:37]
committee and advisory planning
[1:51:39]
commission have uh stipulated that there
[1:51:43]
should be protective covenants on the
[1:51:47]
orchard
[1:51:49]
uh portion and they there's a I'm not
[1:51:52]
sure if it if it's a heritage covenant
[1:51:55]
or just a protective covenant but um
[1:52:00]
are are that was part of your
[1:52:02]
recommendation. I don't I don't see
[1:52:05]
>> um I I think I would seek council
[1:52:08]
direction if that's desired to be
[1:52:10]
included. I think in terms of you know
[1:52:12]
the riparian area covenant is is fairly
[1:52:15]
straightforward. It's a small portion of
[1:52:17]
the lot that's outside the agriculture
[1:52:19]
area that is riparian. Um and then in
[1:52:22]
terms of agriculture covenant
[1:52:26]
um I guess there's different ways
[1:52:28]
council could want to go. So one is to
[1:52:29]
say that we protect this area as
[1:52:31]
agricultural land is fairly
[1:52:34]
straightforward, right? You you draw it
[1:52:35]
on a map, you say this is agriculture.
[1:52:37]
It has to be agriculture can't be used
[1:52:39]
for residential purposes or whatever
[1:52:41]
else it could be. Um
[1:52:44]
and that would protect it as you know
[1:52:46]
orchard or other farmland something. And
[1:52:49]
then if you want to go the step of you
[1:52:51]
know protecting the heritage orchard
[1:52:54]
that's a more involved process. I think
[1:52:56]
you heard from the public comment, you
[1:52:58]
know, somebody proposing it it being a a
[1:53:00]
land trust, you would need some way to
[1:53:02]
regulate it. If the covenant is supposed
[1:53:04]
to say we want to protect the heritage
[1:53:06]
trees that they are maintained, that the
[1:53:08]
biodiversity is maintained, then you
[1:53:10]
then you're looking at okay, who's who's
[1:53:12]
monitoring that on a regular basis and
[1:53:14]
ensuring follow-up and that's a much
[1:53:16]
more comp complicated covenant
[1:53:20]
um and more involved.
[1:53:22]
Well, it may be much more complicated,
[1:53:23]
but I think
[1:53:26]
what I'm understanding is that's what we
[1:53:27]
should be doing. We should be protecting
[1:53:29]
the diversity and um the the specific uh
[1:53:35]
heritage of that orchard. Um then the
[1:53:40]
question came up, well so if we if we
[1:53:43]
don't do that, what's to pre prevent a a
[1:53:46]
future owner from basically just keeping
[1:53:50]
his agriculture land but letting the
[1:53:51]
orchard fail?
[1:53:54]
And so I mean my thought would be we
[1:53:56]
should be protect
[1:54:05]
» through the chair. Thanks.
[1:54:06]
[clears throat]
[1:54:07]
I I understand the arguments about
[1:54:09]
protecting the orchard and the heritage
[1:54:12]
of the orchard, but it's also private
[1:54:15]
property and telling people what to do
[1:54:18]
with private property. I I realize
[1:54:21]
there's there certain things we must
[1:54:23]
tell them what to do, but telling the
[1:54:27]
owner or a potential future owner, you
[1:54:29]
must grow apples. You must maintain this
[1:54:32]
orchard here.
[1:54:34]
We're basically,
[1:54:37]
well, not basically, we are telling them
[1:54:39]
this is the use of your property, like
[1:54:41]
it or not. And and I'm I'm troubled by
[1:54:44]
that approach to private property.
[1:54:48]
That's my comment.
[1:54:50]
>> Councelor Fast. Um, thank you and I
[1:54:54]
appreciate the comments. I too um like
[1:54:58]
uh councelor wake am interested in a
[1:55:00]
conservation covenant for the heritage
[1:55:04]
orchard apple trees and uh that's
[1:55:07]
because I see them their value more as a
[1:55:09]
gene bank and uh as a uh heritage
[1:55:15]
um value uh to Canada and beyond. Some
[1:55:18]
of that um uh genetic material was
[1:55:22]
collected from down in the United
[1:55:25]
States. As I understand it, this is a
[1:55:27]
international kind of uh gene bank uh
[1:55:30]
for our changing climate uh future. Um
[1:55:34]
and I would look at in terms of the
[1:55:35]
private property part, um I would look
[1:55:38]
at it as a uh like a heritage building.
[1:55:42]
Um this is a heritage uh property or an
[1:55:46]
heritage part of the property that's
[1:55:48]
been uh developed and uh by planting
[1:55:52]
these her collecting and planting these
[1:55:54]
heritage trees and maintaining them uh
[1:55:56]
so that they can share the um cutings uh
[1:56:01]
the the the twigs with other um people
[1:56:04]
because you can't reproduce these
[1:56:07]
heritage varieties from seeds. Um and um
[1:56:11]
I appreciate the um uh
[1:56:17]
conversations that have happened with
[1:56:19]
the neighborhood and with the uh ideas
[1:56:22]
coming forward from uh people including
[1:56:25]
the uh Wellland Community Orchard and
[1:56:28]
any others that uh people come up with
[1:56:30]
as examples for how such a covenant uh
[1:56:33]
or uh arrangement could happen.
[1:56:37]
As I recall earlier in the process,
[1:56:39]
there was uh interest from prospective
[1:56:43]
land owners at the time to working with
[1:56:45]
the community to find way um to uh
[1:56:49]
involve the community to to care for the
[1:56:52]
trees, that kind of thing. And uh so I'm
[1:56:54]
in favor of a conservation covenant on
[1:56:57]
the heritage apple tree um varieties
[1:57:01]
that orchard. Yeah. Thank you
[1:57:06]
» councelor Sonnage here.
[1:57:08]
>> Um I I want to make sure that my
[1:57:11]
positions on this is clear is I I fully
[1:57:14]
understand the concept of heritage and I
[1:57:18]
and um
[1:57:20]
councelor F comments about the genetic
[1:57:23]
seedlings. I I get that and and I agree
[1:57:25]
with you on that. I I think there's real
[1:57:28]
value in that. Um, my concern about it,
[1:57:32]
I'm if we're particularly that
[1:57:34]
interested in maintaining this, maybe we
[1:57:37]
should own it if we're going to have to
[1:57:39]
if we're going to tell other people what
[1:57:41]
to do with that specific area of the
[1:57:42]
property. It just sounds like it sounds
[1:57:46]
like an imposition from government that
[1:57:49]
isn't warranted um without what without us supporting it in
[1:57:57]
uh in some way. Um I I just I struggle
[1:58:02]
with the private property part of it
[1:58:03]
understanding the uh the comments that
[1:58:06]
have been raised already and and
[1:58:08]
appreciating them and agreeing with many
[1:58:10]
of them. But I I think at its core I
[1:58:12]
struggle with the telling people
[1:58:15]
more about what to do with their
[1:58:17]
property than we already do in many
[1:58:18]
cases. I I know I understand the need
[1:58:21]
for it. You can't um you know like in a
[1:58:24]
lot of cases don't be building your
[1:58:26]
building right up against the sea coast
[1:58:28]
and things. I understand that. I think
[1:58:31]
this one is possibly going beyond that.
[1:58:34]
Just my thoughts. Thank you,
[1:58:35]
>> Cathery.
[1:58:38]
Um, okay. Two or three points. Um, I
[1:58:41]
think that the, um, if what we're doing
[1:58:44]
is trying to send this off to trust and
[1:58:47]
to get through their checklist, then
[1:58:49]
that's that's one part of the process.
[1:58:52]
And I understand that the um in terms of
[1:58:56]
um the timeline and that the um that
[1:58:59]
this is being rushed to a certain extent
[1:59:02]
um to accommodate the um the owners in
[1:59:05]
terms of the continuation of the side
[1:59:08]
can't renew the temporary use program.
[1:59:11]
They have to have had it uh reszoned. um
[1:59:16]
and that they've left that application
[1:59:18]
late in the process so that they were
[1:59:20]
now trying to push up against that
[1:59:23]
timeline. Um so what um the material
[1:59:28]
that I've been reading um that was
[1:59:30]
attached to this item in the agenda uh
[1:59:33]
from Heather Miller in particular but
[1:59:35]
also um Margaret Underh Hill and she
[1:59:38]
spoke uh Margaret spoke earlier in the
[1:59:41]
public thing um uh public statements um
[1:59:47]
raise issues and I'm not sure that the
[1:59:50]
referral to the island's trust and
[1:59:52]
getting it through first reading
[1:59:54]
is um
[1:59:56]
uh
[1:59:58]
necessarily going to interfere with the
[2:00:01]
questions that are raised. But I would
[2:00:02]
like to put it on record that having
[2:00:04]
read this material, I think that it's
[2:00:06]
rational and reasonable and sounds fair
[2:00:09]
and it's something that I need more time
[2:00:12]
on. Um so I'm not prepared to go um I'll
[2:00:16]
put the proponents on notice. I'm
[2:00:18]
certainly nowhere close to prepared to
[2:00:20]
go to second or third reading uh unless
[2:00:22]
a whole lot of those questions are
[2:00:24]
answered. Um and the question that was
[2:00:27]
raised at the APC in terms of and in
[2:00:29]
this correspondence with respect to the
[2:00:31]
definition of cery and the amount of
[2:00:34]
juice that can be brought in. Whether
[2:00:37]
that protects the heritage orchard or
[2:00:39]
whether that um you know turns it into
[2:00:42]
manufacturing instead of agriculture is
[2:00:45]
a question that I think needs much
[2:00:47]
deeper um conversation. And I think that
[2:00:51]
actually that for me opens up the whole
[2:00:53]
issue of there being an open house on
[2:00:55]
this um and whether or not we should
[2:00:57]
resend that decision that we made in May
[2:01:00]
before we had a lot of this other
[2:01:02]
information on the table. So I think
[2:01:04]
that's up in the air as well.
[2:01:07]
um the the business of the heritage and
[2:01:10]
protecting a heritage asset. Um that's
[2:01:12]
the what uh councelor Saunders is
[2:01:15]
talking about. That's the struggle that
[2:01:16]
goes on with every heritage property.
[2:01:18]
It's an interference by the community in
[2:01:21]
the private property interests of
[2:01:23]
somebody that wants to change things. So
[2:01:25]
that's the whole point of heritage
[2:01:28]
protection. And um you know, yes, it the
[2:01:32]
legislation clearly allows for that kind
[2:01:35]
of interference. And it is unusual and
[2:01:37]
it's unique and it's a special section
[2:01:39]
of the local government act, but it's it
[2:01:42]
is allowed and it's a a public community
[2:01:45]
definition or decision in terms of yes,
[2:01:48]
that's an asset that we think needs to
[2:01:50]
be without having to buy it. Um that you
[2:01:53]
can put certain conditions on it in
[2:01:55]
terms of you know it's something that a
[2:01:57]
whole lot of effort was put into
[2:01:58]
creating it in the beginning or however
[2:02:00]
long ago that was. So um I would say
[2:02:04]
that if we move to u a referral to
[2:02:07]
islands trust that's one thing in terms
[2:02:10]
of this checklist but it's quite an a a
[2:02:13]
much more difficult process I think once
[2:02:16]
it comes back from trust and we have to
[2:02:19]
deal with second and third reading I'm
[2:02:20]
nowhere close to being and I'm changing
[2:02:23]
my position from when was this last year
[2:02:27]
May
[2:02:28]
>> May
[2:02:29]
>> um so you know I at that point. I
[2:02:32]
thought that the problem was that the um
[2:02:35]
the neighbors had reconciled to the
[2:02:38]
operation of a commercial cery and
[2:02:40]
without the bed and breakfast and that major issue had been resolved. And
[2:02:47]
now at the you know the 11 11 and a half
[2:02:51]
hours there's a whole bunch of other
[2:02:53]
material that comes in with respect to
[2:02:54]
water in particular and um uh septic and
[2:03:00]
um green waste and uh whether or not all
[2:03:03]
of that has been put to um Vancouver
[2:03:08]
Coastal Health. if I had them here
[2:03:09]
today, I'd be asking them some questions
[2:03:11]
in terms of whether or not they had
[2:03:14]
taken some of these other things into
[2:03:15]
consideration and I would certainly hope
[2:03:17]
that um staff would take the
[2:03:20]
correspondence seriously and maybe ask
[2:03:22]
those questions on our behalf of
[2:03:23]
Vancouver Coastal Health, but um we
[2:03:26]
don't have that material in front of us
[2:03:27]
today. So, um
[2:03:30]
I'm I don't think that our decision
[2:03:34]
today to refer it to trust would
[2:03:36]
necessarily change in terms of it having
[2:03:38]
going back to trust. So, you know, if we
[2:03:41]
can have some of our concerns
[2:03:43]
alleviated, that's fine. But, um I agree
[2:03:47]
with the very detailed uh conservation
[2:03:51]
covenant and protection of a heritage
[2:03:53]
value asset in the community. And I'm
[2:03:56]
very concerned about the definition of
[2:03:58]
the cidery and
[2:04:01]
um yeah some of these other water
[2:04:04]
concerns that are raised in the the
[2:04:07]
correspondence.
[2:04:08]
I don't appreciate getting 14 pages of
[2:04:11]
detailed um argument on the day of a
[2:04:15]
meeting. It's really hard to digest it.
[2:04:17]
But that's beside the point.
[2:04:21]
So, um, myself and the speakers list,
[2:04:24]
too. Um, as a point of information, um,
[2:04:28]
all of those detailed letters have come
[2:04:30]
from somebody who no longer, as far as
[2:04:33]
we can tell, resides on Bowen Island or
[2:04:36]
owns property on Bowen Island. Um, and
[2:04:40]
those were all sent to us
[2:04:43]
directly earlier.
[2:04:45]
I mean, my my inbox has been inundated
[2:04:48]
with them, so I'm assuming yours has,
[2:04:50]
but the other is um is there a way to
[2:04:54]
with the definition of apples on the
[2:04:57]
lot? Um
[2:05:00]
I mean, I'm everybody wants to protect
[2:05:02]
the existing trees, but if we had a huge
[2:05:05]
awful winter storm and they all died,
[2:05:06]
well, they all died and then what do you
[2:05:08]
do? Um you can't build something else.
[2:05:11]
But could could we put in the word um
[2:05:14]
something along the lines in the
[2:05:16]
definition of cery that the production
[2:05:17]
comes from uh the existing trees from
[2:05:21]
fruit grown on the existing trees on the
[2:05:23]
lot unless those trees die.
[2:05:27]
Um you know so that they could be
[2:05:30]
replaced with I mean what happens if
[2:05:32]
those trees did get wiped out?
[2:05:35]
I mean
[2:05:36]
>> they had to replant if there was a
[2:05:37]
covenant saying you had to keep those
[2:05:39]
trees.
[2:05:41]
>> Yeah. To the chair. I mean I think
[2:05:43]
that's a question more for the the
[2:05:44]
covenant than the cidery definition
[2:05:47]
which is more supposed to be like an an
[2:05:49]
islandwide definition for the the cidery
[2:05:52]
land use.
[2:05:53]
>> Okay. So my other question is if we gave
[2:05:55]
it first reading today
[2:05:58]
and referred it to the trust,
[2:06:01]
could the covenant be explored
[2:06:05]
um after and be a condition of going you
[2:06:09]
know ask staff to explore the covenant
[2:06:12]
and then
[2:06:14]
at second reading we make it a condition
[2:06:16]
of second or third or final reading.
[2:06:20]
>> Um I mean yes it can be. So I me and the
[2:06:23]
corporate officer had drafted some
[2:06:25]
wording of of council wanting to move
[2:06:26]
that forward. Um I think the one piece I
[2:06:29]
guess would be if if the island trust
[2:06:31]
comes back and says well our approval
[2:06:33]
would be you know conditional on there
[2:06:35]
being a covenant which they've done for
[2:06:36]
some reasoning applications then we
[2:06:38]
would be saying okay well then clearly
[2:06:40]
you know the trust's expectations this
[2:06:42]
is this is included as well. Um, but
[2:06:45]
definitely, you know, council can amend
[2:06:48]
the application at second reading.
[2:06:52]
>> Council passed. Thank you. I'd be
[2:06:54]
interested in seeing the draft wording
[2:06:57]
that uh you and the corporate officer
[2:06:59]
have uh talked about.
[2:07:07]
Okay. So you've just called it ongoing
[2:07:09]
protection of
[2:07:12]
>> yeah we written yeah in terms of ongoing
[2:07:14]
protection of the biodiversity of the
[2:07:16]
heritage orchard. So it's not about
[2:07:17]
protection of the agriculture land but
[2:07:19]
about but the the idea of ongoing
[2:07:21]
protection is saying it's beyond just
[2:07:23]
saying you know you can't you can't
[2:07:24]
build a house here but there needs some
[2:07:26]
provision for ongoing protection.
[2:07:29]
>> Well I like that because it doesn't mean
[2:07:31]
that it has to be a conservation
[2:07:33]
covenant. There could there's other
[2:07:34]
tools
[2:07:35]
>> uh potentially. Um
[2:07:38]
but if that's the wording from staff, if
[2:07:41]
I move that now, can we still move on to
[2:07:43]
the um uh giving it first reading and um
[2:07:48]
>> I I would see those two as sort of
[2:07:50]
happening and then and then the
[2:07:52]
recommendation if council wishes. So
[2:07:55]
yes.
[2:07:56]
>> Okay. Then I move that council direct
[2:07:59]
staff to seek protection of the riparian
[2:08:01]
areas as a condition of reasonzoning
[2:08:03]
approval and that council direct staff
[2:08:06]
to seek ongoing protection of the
[2:08:07]
biodiversity of the heritage orchard as
[2:08:10]
a condition of reasonzoning approval.
[2:08:16]
» Second.
[2:08:21]
» All in favor?
[2:08:23]
All right.
[2:08:25]
>> Okay.
[2:08:27]
>> Um and then
[2:08:29]
are you going to move the second part of
[2:08:31]
the motion?
[2:08:32]
>> I would be delighted to. Um
[2:08:36]
this is the same as it's in our package,
[2:08:38]
I think. Okay. um that bylaw number 726
[2:08:41]
cited as Bowen Island Municipality Land
[2:08:43]
Use bylaw number 57, 2002, amendment
[2:08:47]
bump number 726,2026
[2:08:50]
be read a first time and that council
[2:08:53]
refer uh bylaw number 726206
[2:08:58]
and the wording from Sophie about the on
[2:09:02]
the um islands trust policy statement
[2:09:06]
checklist. list.
[2:09:09]
Uh,
[2:09:09]
>> sorry, just go. It's on the It's on the
[2:09:12]
screen.
[2:09:12]
>> Oh, thank you. Uh, checklist included in
[2:09:15]
the on table items package of the July
[2:09:18]
27 regular council meeting to the
[2:09:20]
island's trust and that council uh
[2:09:23]
direct staff to return with the results
[2:09:25]
of the referral.
[2:09:26]
>> Do we have a seconder? Council Saunders.
[2:09:29]
All in favor?
[2:09:31]
I [clears throat]
[2:09:33]
Good. I have a quick question.
[2:09:38]
Do you have a question?
[2:09:39]
>> Yeah. Okay. Um Daniel, don't disappear.
[2:09:42]
>> U just a quick question for the planner.
[2:09:44]
Um and do any of these um resolutions
[2:09:49]
preclude council from moving to public
[2:09:50]
hearing at a later date um as this
[2:09:54]
application proceeds.
[2:09:55]
>> Thank you. That's a great great
[2:09:56]
question. I was going to raising it for
[2:09:58]
council Getty. Um so typically when when
[2:10:01]
there's no public hearing required and
[2:10:04]
where council's given the notice, we
[2:10:05]
would come back as staff um for the
[2:10:07]
bylaw for consideration of second and
[2:10:09]
third reading. We would bring an
[2:10:11]
alternative which would be council would
[2:10:12]
give second reading and refer to a
[2:10:14]
public hearing at that time.
[2:10:17]
>> Okay,
[2:10:18]
>> if that's clear.
[2:10:19]
>> So if we want to proceed to public
[2:10:20]
hearing, we do it after second.
[2:10:22]
>> Correct.
[2:10:23]
>> Okay.
[2:10:25]
>> Thank you.
[2:10:29]
Okay.
[2:10:31]
Oops. Have we lost everybody here? Uh,
[2:10:34]
staff report solid waste service
[2:10:36]
agreement. Christina Cali.
[2:10:46]
Thank you, council. I haven't prepared a
[2:10:48]
presentation, but I can walk you through
[2:10:49]
the staff report.
[2:10:51]
Okay. So staff are seeking council
[2:10:54]
direction to issue a notice of intent
[2:10:55]
for a proposed 2-year solid waste
[2:10:57]
services agreement with Bowen Waste
[2:10:59]
Solutions. This is for the period of
[2:11:01]
January 1st, 2027 to December 31st,
[2:11:04]
2028.
[2:11:06]
Bowen Waste Solutions is is the
[2:11:08]
municipality's current contractor and
[2:11:10]
has provided continuous solid waste
[2:11:12]
services on Bowen Island since 1994.
[2:11:15]
Their proposed agreement would maintain
[2:11:16]
existing service levels for garbage,
[2:11:18]
organics, recycling, collection, as well
[2:11:21]
as operation of the bird facility,
[2:11:23]
ensuring uninterrupted service while the
[2:11:25]
municipality completes a comprehensive
[2:11:27]
review of its long-term solid waste
[2:11:29]
system.
[2:11:31]
In addition to maintaining current
[2:11:32]
services, the negotiated agreement
[2:11:34]
includes a commitment from Bow and Waste
[2:11:36]
Solutions to work collaboratively with
[2:11:38]
the municipality, Recycle BC, and
[2:11:41]
potentially other extended uh producer
[2:11:43]
responsibility recycling programs in
[2:11:45]
order to inform the development of an
[2:11:47]
updated solid waste strategy for Bowen
[2:11:49]
Island. This work will support
[2:11:52]
evaluation of future opportunities which
[2:11:54]
could include potential participation in
[2:11:56]
recycle BC assessment of depot versus
[2:11:59]
curbside recycling models analysis of
[2:12:02]
recycling revenues and costs possible on
[2:12:05]
island solid waste or composting
[2:12:06]
solutions as well as the identification
[2:12:09]
of long-term service delivery options
[2:12:10]
that maximize both environmental and
[2:12:13]
financial benefits.
[2:12:16]
The negotiated contract value is 1.434
[2:12:18]
434 million annually. This is
[2:12:21]
representing a 14.5% increase over the
[2:12:24]
current agreement. This increase
[2:12:26]
reflects higher labor, fuel,
[2:12:28]
transportation, equipment, maintenance,
[2:12:30]
and regulatory costs experienced by
[2:12:32]
Bowen Waste over the term of the
[2:12:34]
existing contract.
[2:12:36]
The two-year term was intentionally
[2:12:38]
selected to provide a short-term cost
[2:12:40]
certainty while preserving flexibility
[2:12:42]
to implement recommendations from the
[2:12:44]
forthcoming solid waste strategy.
[2:12:47]
Uh preliminary analysis indicates that
[2:12:49]
participation in recycle BC could
[2:12:50]
provide significant financial benefits
[2:12:53]
as well as enhance recycling performance
[2:12:55]
which would make it important that the
[2:12:56]
municipality retain flexibility while
[2:12:58]
these opportunities are fully evaluated
[2:13:00]
over the next two years.
[2:13:02]
Issuing a notice of intent would support
[2:13:05]
the transparency and compliance with
[2:13:06]
procurement uh requirements by providing
[2:13:09]
an opportunity for other qualified
[2:13:11]
suppliers to demonstrate their ability
[2:13:13]
to deliver comparable services. If no
[2:13:16]
valid changes or challenge is received,
[2:13:18]
staff will proceed with finalizing the
[2:13:20]
agreement and return to council for
[2:13:22]
approval. If a valid challenge is
[2:13:25]
received, staff will undertake
[2:13:26]
competitive procurement process.
[2:13:28]
>> Thank you.
[2:13:30]
>> Would somebody like to move the motion
[2:13:32]
or has questions?
[2:13:35]
>> I'll move the motion.
[2:13:40]
» Want me to read it?
[2:13:41]
>> Yeah. [laughter]
[2:13:42]
Uh the council directs staff to post a
[2:13:46]
notice of intent to proceed with a
[2:13:48]
direct award to Bowen Waste Solutions,
[2:13:50]
Inc. for a solid waste services
[2:13:53]
agreement and that upon expiry of the
[2:13:56]
notice period without receipt of a valid
[2:13:58]
challenge that staff will be authorized
[2:14:00]
to enter a 2-year contract beginning
[2:14:03]
January 1st, 2027 with Bowen Waste
[2:14:06]
Solutions, Inc. for1,443
[2:14:11]
434,112
[2:14:13]
per year and further that should the
[2:14:15]
notice be successfully challenged staff
[2:14:18]
will be directed to undertake a
[2:14:20]
competitive procurement process
[2:14:22]
including a request for proposals in
[2:14:25]
accordance with the applicable
[2:14:27]
procurement policies and legal
[2:14:29]
requirements. Seconder council Getty.
[2:14:33]
Any questions, discussion? All those in
[2:14:35]
favor?
[2:14:40]
» Thank you.
[2:14:40]
>> Can I take a two-minut break or I'm
[2:14:43]
going to disappear for
[2:14:44]
>> couple minutes?
[2:14:52]
» Have we still got?
[2:14:53]
>> Yeah, we've got four. Well, I don't
[2:14:54]
know. We've lost two two members right
[2:14:56]
now. I think just roll everybody.
[2:14:59]
>> I think we're taking a twominut break.
[2:18:50]
Everyone, my name is Mer Bornia. I'm the
[2:18:53]
new manager of infrastructure with Roy
[2:18:56]
Municipality.
[2:18:57]
Today I will provide an update on the
[2:19:00]
emergency repairs at the Snove North and
[2:19:03]
South WS. This is an information update
[2:19:06]
only and I'm not asking council for any
[2:19:09]
direction or approval. I will just
[2:19:11]
explain what we have found, what we have
[2:19:14]
done so far and what happens next.
[2:19:18]
This is the agenda [clears throat] of my
[2:19:20]
today's presentation. I will begin with
[2:19:22]
some background on why why these warves
[2:19:25]
are important. I will then explain what
[2:19:27]
the structural assessment have found the
[2:19:29]
immediate the immediate safety measures
[2:19:32]
that you have taken the periscope
[2:19:35]
how the work will be completed approval
[2:19:38]
costs schedule and risk and last but not
[2:19:42]
least the long-term plan for these
[2:19:43]
warfs.
[2:19:46]
Um the area photo that you see on this
[2:19:49]
slide u has been taken by my drone. It
[2:19:53]
shows north and south bars um are next
[2:19:56]
to BC Ferris terminal. These barves
[2:20:00]
support public access, vessel morage,
[2:20:02]
municipal operations and the ambulance
[2:20:05]
and emergency vehicle access.
[2:20:08]
The warves are supported on timber piles
[2:20:12]
in salt water and are exposed to tides
[2:20:15]
and marine borers which damage the
[2:20:17]
timber from the inside.
[2:20:20]
When the concerns were identified, we
[2:20:23]
have acted quickly and emergency
[2:20:25]
inspection was completed on June 12th
[2:20:28]
followed by a detailed assessment on
[2:20:30]
June 16.
[2:20:32]
So what did the assessment found in
[2:20:35]
summary? Widespread marine border damage
[2:20:38]
and localized advanced deterioration.
[2:20:42]
The photos on this slide show the main
[2:20:45]
concern better than I can explain. Some
[2:20:48]
piles might appear reasonably solid from
[2:20:51]
the outside but contain large internal
[2:20:54]
cavities. The assessment also found
[2:20:57]
timber decay, splitting, the
[2:21:01]
deterioration of the pile caps and the
[2:21:04]
stringers. In total, 12 structure
[2:21:08]
components were identified for immediate
[2:21:10]
repair or replacement.
[2:21:13]
Other components identified will need
[2:21:16]
require will require near-term
[2:21:18]
rehabilitation and ongoing monitoring
[2:21:23]
immediate safety measures. So we did not
[2:21:27]
wait for the perimeter repair design
[2:21:29]
before taking action.
[2:21:31]
Temporary full height timber support
[2:21:34]
post were installed beside the two most
[2:21:36]
deteriorated part. This is what you see
[2:21:38]
in this photo here. We also introduced
[2:21:42]
operating restrictions.
[2:21:45]
Only essential municipal emergency
[2:21:48]
vehicles are permitted with a maximum
[2:21:51]
speed of 5 kilometer per hour and only
[2:21:53]
one vehicle at a time. We train access
[2:21:56]
remains available and emergency and
[2:21:58]
ambulance access is maintained.
[2:22:04]
So in this slide I have briefly shown
[2:22:08]
the the repaircope.
[2:22:11]
The repair scope includes replacement of
[2:22:14]
severely deteriorated timber piles,
[2:22:17]
replacement of deteriorated timber uh
[2:22:21]
timber pile caps, localized stringer and structural connection repairs, rehab
[2:22:28]
rehabilitation of piles with large
[2:22:30]
cavities with grafted steel jacket to
[2:22:32]
restore part capacity in locations where
[2:22:35]
pile placement is not feasible. So if
[2:22:38]
contractor cannot get access to fully
[2:22:41]
replace a pile, what they do is that
[2:22:43]
they're going to fill the cavity with
[2:22:44]
grout and then protect it with steel
[2:22:47]
jacket. This is what this detail is
[2:22:49]
showing here. Um removal of deteriorated
[2:22:53]
or marine infested timber from site and
[2:22:56]
reinstatement of decking and other
[2:22:58]
temporary removed components.
[2:23:03]
A common question that might be asked is
[2:23:07]
how the construction will be done.
[2:23:10]
Um most of the answer to that question
[2:23:12]
is that the most of the work will be
[2:23:15]
completed from the water side. The dark
[2:23:18]
areas on these slide show the
[2:23:21]
approximate barge positioning.
[2:23:24]
Um the red area is pile driving
[2:23:27]
equipment on top of the barge. We have
[2:23:30]
retained a specialized marine contractor
[2:23:33]
who is equipped with a specialized wars.
[2:23:36]
that uh have pile driving equipment
[2:23:39]
and they also have boats that can go in
[2:23:42]
between the piles that are underneath
[2:23:44]
the the the pier structure.
[2:23:52]
What one thing that is um important to
[2:23:55]
note on this slide is that during the
[2:23:57]
active construction we plan to install
[2:24:00]
operable gates. The operable gates will
[2:24:04]
keep public out of the active
[2:24:06]
construction zone but it will let the
[2:24:09]
emergency vehicle and ambulance to go
[2:24:12]
through the gate. Um that also includes
[2:24:15]
the owners of these um boats that are
[2:24:17]
parked here. So it's going to be closed
[2:24:19]
to public but it will allow the
[2:24:22]
necessary people to pass through. The
[2:24:24]
other thing that's important to mention
[2:24:27]
is that and this is going to be a phased
[2:24:29]
operation. Phase one would be the
[2:24:32]
southwarf and that's where the
[2:24:34]
contractor is is planning to position
[2:24:36]
their barge to do the repair from the
[2:24:38]
water side. Phase two is going to be the
[2:24:41]
north pier and that's where the
[2:24:44]
contractor is planning to position their
[2:24:46]
barge to do the repairs. So these gates
[2:24:48]
will be installed when there's going to
[2:24:50]
be active construction on each of these
[2:24:52]
wars
[2:24:54]
where we stand with approvals and a
[2:24:56]
stakeholder coordination. We have
[2:24:58]
submitted an application to DFO because
[2:25:01]
we are doing work over over and inside
[2:25:04]
the water. The application is currently
[2:25:06]
in review pending approval. We have
[2:25:09]
submitted the documentation to our own
[2:25:11]
building department. We have coordinated
[2:25:14]
with transport Canada. They have
[2:25:17]
confirmed that this work doesn't require
[2:25:20]
navigation program approval mainly
[2:25:22]
because it meets the requirement
[2:25:25]
uh mainly because it meets the
[2:25:27]
definition of repair as opposed to
[2:25:29]
rebuild. We have also had a meeting with
[2:25:32]
BC fairies on last Friday. They have
[2:25:34]
raised some concern about the size and
[2:25:38]
dimension of the barge. Therefore, they
[2:25:40]
has asked the contractor to submit a
[2:25:42]
drawing that shows exactly where they're
[2:25:45]
going to um position their equipment in in respect to BC Fair's operational
[2:25:52]
envelope.
[2:25:56]
Uh the total cost of the project at this
[2:25:59]
point is estimated at $260,000.
[2:26:03]
The cost includes the the contractor's
[2:26:07]
fee as well as consulting cost which
[2:26:09]
includes a structural and environmental.
[2:26:12]
We have used emergency procurement to
[2:26:15]
procure the contractor and consultant
[2:26:17]
mainly because when the concerns were
[2:26:20]
identified the the time of failure could
[2:26:23]
not be reliably predicted. So that's why
[2:26:25]
we went ahead and um and hired both the
[2:26:30]
consultant and contractor.
[2:26:32]
In terms of project timeline, uh as you
[2:26:35]
can see on this slide, things have moved
[2:26:37]
pretty quickly since we since the
[2:26:40]
concerns were identified. Uh we are
[2:26:42]
currently here. We had our meeting with
[2:26:45]
BC Fairies. We will submit the
[2:26:47]
documentation that they have um asked us
[2:26:50]
to provide. The construction is
[2:26:52]
anticipated to begin mid August pending
[2:26:57]
receiving approvals from DFO and
[2:26:59]
approval of BC fairies to move forward
[2:27:01]
with the work. The target completion
[2:27:04]
date is September 15. However, if we can
[2:27:08]
start earlier in August, uh we are
[2:27:10]
aiming to complete everything before the
[2:27:12]
month of September.
[2:27:16]
Risks and mitigation. So like every
[2:27:19]
construction project, this project has
[2:27:21]
its own risks. It's important to
[2:27:24]
identify them and have appropriate
[2:27:27]
response for each identified risk. I'm
[2:27:30]
not going to go over all the risk that
[2:27:32]
we have identified. But to give you just
[2:27:35]
one example, an example of the risk that
[2:27:37]
was identified was a risk of internal
[2:27:41]
damage not visible from surface. And the
[2:27:44]
proper risk respond for that was
[2:27:46]
resistorraph testing by the structural
[2:27:50]
consultant before the construction
[2:27:51]
begins. And then field verification and
[2:27:54]
engineering review during construction.
[2:27:56]
So if contractor comes across piles that
[2:28:00]
he seems suspicious of needing to be
[2:28:03]
replaced, you're going to bring us bring
[2:28:05]
us to our attention and we will move
[2:28:07]
forward with replacing those as well.
[2:28:11]
Long-term wolf management. I want to be
[2:28:13]
very clear about what these repels will
[2:28:16]
and will not achieve. The project
[2:28:19]
addresses the highest priority
[2:28:21]
deficiencies.
[2:28:22]
However, marine border activity is
[2:28:25]
present at several location across both
[2:28:28]
WS and will continue.
[2:28:31]
Because of this, we need a long-term
[2:28:34]
asset management program. Their
[2:28:36]
recommended future measures are regular
[2:28:39]
tide structural inspection, targeted
[2:28:42]
resistorraph testing for piles that are
[2:28:45]
suspicious of having cavities inside
[2:28:47]
them, monitoring of the repaired and
[2:28:50]
previously identified piles, removal of
[2:28:53]
infested timber debris from site, pile
[2:28:56]
encapsulation or jacket system at
[2:28:58]
priority locations. a phase
[2:29:01]
rehabilitation and renewal strategy and
[2:29:04]
future capital planning um for these
[2:29:07]
bars to make sure every year there's
[2:29:09]
budget to do the proper measures for for
[2:29:13]
these barbs.
[2:29:16]
With this I conclude uh my presentation
[2:29:19]
and I am open to questions from council
[2:29:22]
and the public. Thank you.
[2:29:24]
>> Any questions councelor Getty? Um so
[2:29:29]
somewhere in your report you talk about
[2:29:31]
uh trying to find measures to prevent
[2:29:33]
the marine borers.
[2:29:34]
>> That's correct. Um, and my
[2:29:38]
vague knowledge is that they used to use
[2:29:40]
creassote on the pilings, but that was
[2:29:43]
um considered to um put unnecessary
[2:29:47]
chemicals into the water, which um was
[2:29:50]
part of the cleanup of house sound in
[2:29:52]
terms of wrapping the piles with I think
[2:29:54]
it was something as simple as netting to
[2:29:56]
keep the maybe it was the muscles, not
[2:29:59]
the bores. But um in in terms of
[2:30:04]
whatever preventative measures um are
[2:30:06]
going to be considered um then I think
[2:30:09]
we have to talk about the environmental
[2:30:11]
protection at the same time. Um, so I'd
[2:30:14]
like you to keep that in mind. And I'm
[2:30:16]
wondering if there's any alternatives in
[2:30:17]
terms of the materials that are can be
[2:30:20]
used for ponds like possibly cement or
[2:30:25]
um some metal although it's salt water
[2:30:28]
but
[2:30:30]
through the chair. Um in terms of
[2:30:32]
protection um the protection methodology
[2:30:35]
that BCeries has also lose on their
[2:30:39]
piles is the use of I think HTTP
[2:30:42]
membrane to cover this piles to protect
[2:30:45]
them against marine activity. However,
[2:30:47]
we need to compare the cost of that with
[2:30:51]
full replacement of the pile because it
[2:30:53]
could be that the cost associated with
[2:30:55]
that repair is higher than the full
[2:30:58]
replacement of the P. We have the cost
[2:31:00]
associated with full replacement as a
[2:31:03]
result of the work that we are doing
[2:31:04]
now. But that's a good um subject to
[2:31:07]
discuss with the structural engineer and
[2:31:09]
contractor to find out what's the best
[2:31:12]
solution for our situation.
[2:31:15]
>> And um I've got two other questions. Is
[2:31:18]
there going to be a fairly complete
[2:31:20]
assessment done before construction
[2:31:22]
starts so that we have while we've got
[2:31:24]
the equipment on site um if we if it's
[2:31:26]
within budget that we can do as much
[2:31:29]
protection as possible.
[2:31:31]
>> So a full assessment was completed
[2:31:34]
>> but the scope of assessment was to
[2:31:36]
identify the immediate concerns which
[2:31:39]
were safety issue. the ones the what
[2:31:42]
cons um consultant has recommended
[2:31:46]
they are basically safety issues and we
[2:31:48]
need to take care of them immediately.
[2:31:50]
However, we can I I will discuss with
[2:31:54]
the consultant whether um there are
[2:31:56]
protection measures that we can take
[2:31:59]
during the construction if that is if
[2:32:02]
that is considered feasible.
[2:32:04]
And lastly on the um south dock um the
[2:32:10]
float that's attached to it that's
[2:32:13]
heavily used by visitors.
[2:32:15]
>> Yes,
[2:32:15]
>> boat visitors. So how do we keep them
[2:32:17]
off?
[2:32:18]
>> And second part of that is that that's
[2:32:21]
notifying the public. How do we notify
[2:32:24]
and and is there a plan to notify the
[2:32:26]
bed and breakfast operators that are in
[2:32:28]
the area that are going to be disturbed
[2:32:31]
by the pile driving?
[2:32:34]
My understanding is that um
[2:32:37]
the communication will be done through staff to public and they will be
[2:32:43]
informed of these upcoming operations.
[2:32:46]
In terms of visitors going over the um
[2:32:49]
dock, we are going to put operable gates
[2:32:53]
there and we're going to put signage
[2:32:55]
there that the public are not allowed
[2:32:58]
and people who are allowed are basically
[2:33:00]
the ambulance and the owners of the
[2:33:03]
boats who are park on that dock. It's a
[2:33:07]
risk measurement. It's a riskmanagement
[2:33:10]
um effort to limit public access to make
[2:33:13]
sure during active construction we don't
[2:33:16]
have public wandering around those
[2:33:18]
ducks. So that's why we're going to put
[2:33:21]
a upper gate with proper signage that
[2:33:24]
can be accessed by um by um authorized
[2:33:28]
personnel.
[2:33:30]
>> So we don't really have any we're not
[2:33:32]
closing down the float for tourists
[2:33:34]
coming in.
[2:33:36]
I would say for tourists we have to
[2:33:39]
close it down. Only the people who have
[2:33:42]
u boats parked there
[2:33:44]
>> should go through because if you think
[2:33:47]
about it this is going to be an active
[2:33:49]
construction zone. The contractor knows
[2:33:51]
that once they leave the site they have
[2:33:53]
to um put the condition of the site in a in a condition that the ambulance
[2:34:00]
can go through. But I would not
[2:34:03]
recommend giving general public access
[2:34:06]
to these docks during the construction
[2:34:08]
especially that the construction
[2:34:10]
duration is not that long.
[2:34:13]
>> I think the one to two weeks
[2:34:15]
>> CAO had a comment.
[2:34:16]
>> Uh thank you through the mayor to
[2:34:18]
counselor Getty I can add to that too.
[2:34:20]
We have had a coordinating meeting with
[2:34:22]
um a large number of staff to try and
[2:34:24]
identify all of the different um
[2:34:26]
interest holders who would need to be
[2:34:28]
notified ahead of time. um talking about
[2:34:31]
notification of the the those residents
[2:34:33]
right in Snug Cove was part of that
[2:34:35]
conversation. Um the manager of
[2:34:39]
infrastructure did indicate that it was
[2:34:41]
his understanding that all of the
[2:34:43]
construction activity would be taking
[2:34:44]
place during daylight hours. However, he
[2:34:46]
is going to follow up with that because
[2:34:49]
of course it's working in the water with
[2:34:51]
tides and if there is to be nighttime
[2:34:54]
construction then absolutely members of
[2:34:56]
the community need advanced and
[2:34:58]
significant knowledge about that
[2:35:00]
potential. We are planning on closing
[2:35:02]
the float to um to tourists. So, we are
[2:35:07]
going to be contacting two of the
[2:35:09]
marinas in Horseshoe Bay and in West
[2:35:12]
Vancouver that often send their tourists
[2:35:14]
to say, "Hey, it's a great trip to come
[2:35:16]
on over to Bowen for the day." We are
[2:35:18]
going to do a very big advanced
[2:35:21]
communication plan ahead of time to make
[2:35:23]
sure that all of the relevant parties
[2:35:26]
that we can identify ahead of time have
[2:35:28]
advanced knowledge of this um activity
[2:35:30]
going on.
[2:35:31]
>> Okay. Councelor Saunders.
[2:35:32]
>> Thank you to the chair. Um, you may have
[2:35:34]
addressed this in your presentation and
[2:35:36]
I missed it. Is there any reason to
[2:35:39]
expect that ferry schedules might be
[2:35:41]
impacted during operations or should be
[2:35:44]
non-issue
[2:35:46]
>> to the chair? Um, no. No impact on ferry
[2:35:50]
schedule is expected unless something
[2:35:52]
unforeseen happens that is beyond
[2:35:54]
everybody's control. [laughter] But the
[2:35:56]
contractor has confirmed that they can
[2:35:58]
work from the water side and they will
[2:36:00]
stay out of F's operational envelope and
[2:36:05]
we had a coordination meeting on Friday
[2:36:06]
with them and uh also BC fairies did not
[2:36:09]
mention anything about any disruptions
[2:36:12]
in their operation as a result of our
[2:36:14]
voters.
[2:36:15]
>> Thank you.
[2:36:17]
>> Anybody else? Councelor Wake
[2:36:20]
>> through the chair. Uh thank you for a a
[2:36:23]
very thorough report. This this gives me
[2:36:26]
confidence. Um just following up on the
[2:36:28]
question about materials. Um where were
[2:36:31]
replacing piles? Is there any option for
[2:36:34]
steel or something that uh wouldn't rot?
[2:36:40]
>> To the chair. Um the plan is like for
[2:36:43]
leg replacement, but that's a good
[2:36:46]
question. I can uh ask that question
[2:36:48]
from the structural engineer and provide
[2:36:51]
reasoning about why we can move forward
[2:36:54]
with the steel.
[2:36:56]
>> Thank you.
[2:36:57]
>> And I had a question sort of along the
[2:37:00]
same lines I guess. um if all of the
[2:37:03]
piles are in say one side or one corner
[2:37:05]
or something like that. I mean has
[2:37:07]
anybody thought about just making the
[2:37:09]
war smaller on the north dock, not uh
[2:37:13]
you know not replacing the whole thing
[2:37:15]
if the piles are all in one particular
[2:37:17]
area. And I I know the dock dance for
[2:37:19]
the fire chief would be
[2:37:22]
impacted, but other than that, you know,
[2:37:24]
I mean, do we need that big a north dock
[2:37:28]
>> through the chair? um on the north or
[2:37:31]
even south dock. We don't plan to
[2:37:33]
replace all piles. It's only 12 members
[2:37:35]
that are identified for emergency
[2:37:37]
replacement
[2:37:38]
>> and they're interspersed throughout the
[2:37:40]
they're not all along the one side or
[2:37:42]
something like that.
[2:37:43]
>> They're they're scattered to some
[2:37:45]
extent, but on the south dock luckily
[2:37:48]
most of them are on one end of the pier
[2:37:52]
which allows the contractor to to do
[2:37:54]
their repair work from the water side.
[2:37:56]
they're not in kind of in the middle
[2:37:59]
that requires basically taking out the
[2:38:01]
deck and do the work. There one or two
[2:38:03]
piles that are in the middle and for
[2:38:06]
those
[2:38:07]
what the contractor will do is that
[2:38:09]
they're going to temporarily support
[2:38:11]
everything from the bottom and they do
[2:38:13]
the replacement from the steel from
[2:38:15]
below.
[2:38:16]
>> Yeah. No, I was more thinking of you
[2:38:18]
know the north dock cert.
[2:38:22]
So I was just thinking if all the piles
[2:38:25]
were the one end of the north dock then
[2:38:27]
make it smaller
[2:38:28]
>> through through the mayor to your
[2:38:30]
question. Uh there's actually not a
[2:38:32]
significant amount of work that has to
[2:38:34]
take place on the north dock. There's I
[2:38:36]
think two piles is
[2:38:38]
>> there's much limited the extent of
[2:38:40]
damage to the north pier is much smaller
[2:38:44]
than the
[2:38:45]
>> than the south than the south beer.
[2:38:47]
>> Okay. So, it's only a pile cap and I
[2:38:51]
think maybe one or two columns that need
[2:38:53]
to be replaced.
[2:38:54]
>> Yeah. Okay, great. Any more questions?
[2:38:59]
» Um, sure. Since you're looking at me, I
[2:39:02]
just uh thank you. I'm really happy to
[2:39:04]
see the safety of that uh do of the
[2:39:07]
docks addressed and uh I always wondered
[2:39:11]
about the dock dance and all the people
[2:39:13]
jumping up and down at the same time and
[2:39:15]
uh would like to be sure that we've been
[2:39:18]
as careful as possible. So, thank you
[2:39:20]
very much.
[2:39:21]
>> Okay, thank you for your presentation.
[2:39:23]
It was great.
[2:39:26]
» Okay, who's up next? Oh, Daniel's back.
[2:39:48]
Thank you. Yes, I'm back again. I don't
[2:39:50]
have a presentation with this. This is
[2:39:51]
an update on the septic um septic
[2:39:54]
maintenance bylaw implementation plan.
[2:39:56]
And so what is in the report is just um
[2:40:00]
essentially status update on where we
[2:40:01]
are in providing more information that
[2:40:03]
would form the basis of that
[2:40:04]
implementation plan. Um specifically the
[2:40:06]
Grafton Lake management plan and our
[2:40:08]
work with Vancouver Coastal Health to
[2:40:10]
get data on existing septic fields on
[2:40:12]
Bowen Island. Um so the recommendation
[2:40:15]
is that council receive this report for
[2:40:17]
information and then I'm open for any
[2:40:19]
questions you might have.
[2:40:21]
>> Does anybody have any questions on the
[2:40:23]
report?
[2:40:27]
Can we have a motion to receive?
[2:40:32]
» Okay, you're going to make the motion to
[2:40:34]
receive. Motion
[2:40:35]
>> to receive.
[2:40:36]
>> Thank you. A seconder. Thank you. Um,
[2:40:39]
all in favor?
[2:40:41]
>> I.
[2:40:43]
>> Well done. [laughter]
[2:40:45]
>> Sophie, can you bring up the key?
[2:40:48]
>> Okay. Um, the next one is uh 8.4, 4
[2:40:51]
which is our quarterly um municipal
[2:40:54]
report and then 8.5 and 8.6
[2:40:58]
our acting CEO and CFO have those three.
[2:41:02]
>> Uh thank you mayor through the mayor to
[2:41:04]
the rest of council. I just wanted to
[2:41:06]
take the opportunity to thank staff for
[2:41:08]
putting together the Q2 spring update to
[2:41:11]
council. Um this report it covers a very
[2:41:14]
uh busy time for staff. These are
[2:41:16]
activities reported from the month of
[2:41:18]
April through the month of June. It's
[2:41:20]
typically a busy time for all of our
[2:41:22]
staff. Uh in the corporate services
[2:41:24]
department, uh the ongoing work to
[2:41:27]
review and update bylaws, policies, and
[2:41:29]
procedures is ongoing. The big project
[2:41:32]
for this reporting period of course
[2:41:34]
includes managing the procurement and
[2:41:35]
installation of the new audiovisisual
[2:41:37]
equipment in this the conference room.
[2:41:40]
Uh this was also supported um with an
[2:41:43]
accessibility component that was funded
[2:41:45]
with a $25,000 uh spark grant. Ongoing
[2:41:49]
support is provided by the corporate
[2:41:51]
services department to municipal
[2:41:53]
projects such as the OCP review um and
[2:41:56]
all of that work that is undertaken by
[2:41:58]
the communications and the deputy
[2:42:00]
corporate officers work following up
[2:42:03]
with our finance department. Uh work on
[2:42:05]
the 2025 audit was wrapped up during
[2:42:08]
this period. Um, we had acceptance of
[2:42:11]
council's acceptance of the 2025 audited
[2:42:13]
financial statements as well as
[2:42:15]
submission of all required government
[2:42:18]
reports to the province which were
[2:42:20]
submitted and approved. Uh, this period
[2:42:22]
also marked the approval of the 2026
[2:42:26]
5-year financial plan and setting of the
[2:42:29]
annual tax rates and sending out of all
[2:42:31]
the tax notices and collection of the
[2:42:33]
annual property taxes. So Q2 marks a
[2:42:36]
very busy period in the financial
[2:42:38]
services department. The engineering and
[2:42:41]
public works department has been busy
[2:42:43]
with a new project that's begun. As you
[2:42:45]
just learned, the um the docks located
[2:42:48]
in Snug Cove as well. A large culvert
[2:42:51]
replacement on Dorman Road has been
[2:42:53]
started at Davies Creek and that will
[2:42:55]
move um forward as well as work that was
[2:42:59]
undertaken um up on Taylor Road at
[2:43:01]
Dallas at Dallas Drive was completed
[2:43:05]
which resulted in improved drainage and
[2:43:07]
road structure there. Um work on the
[2:43:10]
wastewater treatment plant. So within
[2:43:12]
the sewer system uh currently there has
[2:43:14]
been a technical review of the sewer
[2:43:16]
inflow and infiltration project. So
[2:43:18]
council can expect an update uh results
[2:43:21]
from that project next quarter as that
[2:43:24]
review is taking place over the summer.
[2:43:26]
Um a lot of uh work was undertaken in
[2:43:30]
quarter 2 on a new bylaw to update the
[2:43:32]
sewer regulations addressing the fog,
[2:43:35]
the fats, oil and grease going into the
[2:43:37]
wastewater treatment plant. And work on
[2:43:39]
the sewer outfall um I'm happy to report
[2:43:43]
is still progressing albeit at a snail's
[2:43:45]
pace. A lot of the um the hold up in
[2:43:49]
that project moving that forward has to
[2:43:50]
do um beyond factors of our control.
[2:43:53]
It's around permitting approvals and
[2:43:54]
things that are done at the provincial
[2:43:56]
level. Uh staff have completed
[2:43:58]
significant program of ongoing flushing
[2:44:01]
and PRV pressure reducing valve uh
[2:44:04]
maintenance throughout all seven of our
[2:44:06]
water systems. And um as we move into
[2:44:09]
the summer and implementation of our uh
[2:44:11]
water conservation and restriction uh
[2:44:14]
requirements though we are monitoring
[2:44:16]
those and making sure that uh that
[2:44:19]
people are abiding by those uh water
[2:44:21]
conservation regulations.
[2:44:23]
Routine maintenance is going on at the
[2:44:25]
wells and pump stations and um lots of
[2:44:29]
work going on around installation of
[2:44:31]
backflow prevention devices in several
[2:44:34]
of the systems. Parks and trail work is
[2:44:36]
going on underway during this period,
[2:44:38]
especially when the spring when we have
[2:44:40]
the combination of sun and warm
[2:44:42]
temperatures and rain. Um, a lot of
[2:44:45]
really kickstarted vegetation growth.
[2:44:47]
So, you see a lot of activity around the
[2:44:50]
island on brushing maintenance programs.
[2:44:52]
Significant progress made as well in the
[2:44:55]
public works department on the
[2:44:56]
implementation of their software, new
[2:44:58]
asset management systems software which
[2:45:00]
was acquired and is being implemented.
[2:45:03]
And I hopefully you've all seen the new
[2:45:05]
citizen request portal that's up and
[2:45:07]
operational. And that's an opportunity
[2:45:09]
for citizens to um directly enter their
[2:45:12]
own service requests. You know, if they
[2:45:13]
see a pothole, they can notify the
[2:45:15]
public works department. And we'll get
[2:45:17]
that into our worklist and a work order
[2:45:19]
created for that. Um this report, it
[2:45:22]
also contains some nice looking graphs
[2:45:24]
there that report publicly on the
[2:45:26]
numbers and the types of uh service
[2:45:29]
requests that have been logged during
[2:45:30]
the period. and the team has been busy
[2:45:33]
managing and prioritizing those
[2:45:35]
requests. Uh moving on to fire and
[2:45:37]
emergency department. They've been busy
[2:45:39]
with ongoing firefighter training
[2:45:41]
opportunities uh including a lot of
[2:45:43]
wildland firefighting rural water
[2:45:45]
supply. You may have noticed a recent um
[2:45:48]
notification that the department has
[2:45:51]
achieved water shuttle accreditation uh
[2:45:53]
through the fire underwriters surve uh
[2:45:56]
fire underwriters survey recently. So,
[2:45:59]
this is great news for our residents as
[2:46:01]
it provides the opportunity to
[2:46:02]
potentially review their home insurance
[2:46:04]
policies and perhaps uh receive some
[2:46:07]
discounts to their premiums as the new
[2:46:10]
um underwriter survey accredititation uh
[2:46:12]
the benefits of achieving that kick in.
[2:46:15]
Um I should note too that firefighter
[2:46:17]
volunteers responded to 54 callouts and
[2:46:19]
attended a whopping 555 hours of
[2:46:22]
training during the second quarter of
[2:46:24]
2026. Our emergency program has hosted a
[2:46:27]
successful um emergency preparedness
[2:46:30]
week speaker event. Um they've
[2:46:32]
undertaken a do-it-yourself fresh air
[2:46:34]
filter construction project and this is
[2:46:36]
particularly meaningful at this time of
[2:46:38]
the year where residents can learn how
[2:46:40]
to improve their own indoor air quality
[2:46:42]
through a a cheap and fun project. Um
[2:46:46]
it's a necessary way to make
[2:46:47]
improvements to our air quality and we
[2:46:49]
should all be mindful and cognizant of
[2:46:52]
the wildfire risk um at this time
[2:46:54]
especially in um many of areas of our
[2:46:56]
province at the at this time. Uh the
[2:46:59]
recreation department has reported
[2:47:01]
hosting over 6,000 v uh visitors to the
[2:47:04]
community center this quarter. Um our
[2:47:06]
fitness center visits are up 31%. They
[2:47:09]
have an average of about 18 to 20 users
[2:47:12]
per day in the weight room. We had 915
[2:47:15]
program registrants along with 321
[2:47:18]
drop-in participants and 1659
[2:47:22]
fitness center visits this quarter
[2:47:24]
alone. So the usage by the community of
[2:47:26]
this facility is strong and it speaks to
[2:47:29]
the support that the community has um of
[2:47:32]
this facility. Events that were held
[2:47:34]
included the moonflower screening of the
[2:47:37]
Bowen Island filmmaker in support of
[2:47:39]
World Oceans Day. Skate days are
[2:47:41]
continuing for the youth programming um
[2:47:43]
in partnership with IPS down at the
[2:47:45]
fieldhouse and um completion has uh the sorry the bike barn mural has been
[2:47:54]
completed down um at the cove with the
[2:47:56]
work going on at the dock. We're going
[2:47:58]
to hold off on any kind of unveiling of
[2:48:00]
that mural until the fall when the
[2:48:01]
work's completed down there in the
[2:48:04]
theater. Uh the report you'll see in
[2:48:06]
there that it sets out the events that
[2:48:07]
have taken place. It's also um been
[2:48:11]
noted that staff have arranged for
[2:48:13]
installation of the handrails in the
[2:48:15]
theater which have been which have
[2:48:16]
proven to be a real important and
[2:48:18]
necessary safety upgrade. Uh
[2:48:20]
installation of a new donated orac
[2:48:23]
broadcast system um from Sky. This is a
[2:48:27]
system that was donated from Sky and it
[2:48:29]
will um assist in a new hearing um uh
[2:48:34]
system that's more robust and easier to
[2:48:36]
use. Lastly, uh I'm proud to announce
[2:48:39]
that BIM received a KMA award for
[2:48:41]
innovation for design of this facility
[2:48:44]
and uh this award took place in May and
[2:48:48]
we won it in the category for small
[2:48:50]
municipalities under 20,000 for this
[2:48:52]
building. In the parks department,
[2:48:55]
there's been new signage for indigenous
[2:48:57]
names um that have been gifted to the
[2:49:00]
beaches on the west side of the island.
[2:49:01]
It's been ordered and the province has
[2:49:03]
recently approved those proposed name
[2:49:06]
changes. Swimmer safety upgrades uh were
[2:49:09]
undertaken by the installation of a life
[2:49:11]
boy that was uh installed at Sandy Beach
[2:49:14]
and new uh handles to assist swimmers
[2:49:17]
from getting out of the water have been
[2:49:19]
installed on the Mount Gardener dock.
[2:49:21]
We've been um exploring options of
[2:49:23]
community forest models to expand
[2:49:26]
stewardship over crown lands. And the
[2:49:28]
big event in June, of course, um if you
[2:49:31]
missed it, you can still uh go online
[2:49:33]
and and view it. It was a wildlife
[2:49:35]
safety education event with wildlife
[2:49:38]
experts and the Metro Vancouver parks,
[2:49:40]
the RCMP conservation officers all
[2:49:42]
taking part. And I recommend everybody
[2:49:44]
go online and and watch that event. Um
[2:49:47]
it was a a busy time for our planning
[2:49:50]
department. Of course, they're still
[2:49:51]
working on several initiatives. Most
[2:49:53]
importantly, of course, is the OCP
[2:49:54]
review. just that has just recently
[2:49:57]
closed the round two engagement process
[2:50:00]
and those results will be delivered to
[2:50:02]
council in the fall. The ongoing
[2:50:05]
initiative to reszone municipal lands as
[2:50:07]
parks um is wrapping up and that will
[2:50:10]
help to ensure that public lands are
[2:50:11]
held and protected for recreational,
[2:50:14]
environmental and community purposes in
[2:50:16]
perpetuity. the work of the septic
[2:50:19]
maintenance program review as um planner
[2:50:21]
Martin [clears throat] has just
[2:50:22]
indicated it is uh just kind of on hold
[2:50:26]
while we uh work through this OCP
[2:50:29]
process but uh we're going to pick this
[2:50:31]
one up again um in the new year once the
[2:50:33]
OCP review has concluded um bylaw has
[2:50:36]
been very busy supervising and
[2:50:38]
overseeing the fairy marshalling program
[2:50:40]
um we're halfway through the summer the
[2:50:42]
program has proven to be very successful
[2:50:44]
uh adding to the safe and orderly
[2:50:47]
marshalling of vehicles and pedestrians
[2:50:49]
in Snugo. The work um again I'd like to
[2:50:53]
commend their work publicly. It's very
[2:50:56]
important to assist keeping that ferry
[2:50:58]
loading on time, hassle-free, and
[2:51:00]
contributing to on-time operations of
[2:51:02]
the ferry. Um other work within the
[2:51:05]
bylaw department has been to support the
[2:51:08]
uh development of the new um fog, fat,
[2:51:10]
oil, and grease regulation in the sewer.
[2:51:12]
So, uh, Doug has been out taking many,
[2:51:16]
um, samples of, uh, water from grease
[2:51:20]
traps throughout all of the food service
[2:51:22]
establishments, and we'll be working
[2:51:23]
with those businesses quite closely in
[2:51:25]
order to implement those recommendations
[2:51:28]
beginning um, you know, beginning this
[2:51:30]
month. there there's going to be ongoing
[2:51:32]
checking and compliance and requirements
[2:51:34]
for making sure that that um that the
[2:51:37]
fog going into our wastewater treatment
[2:51:39]
system is kept to a minimum which we
[2:51:42]
anticipate is going to help to address
[2:51:44]
the smell.
[2:51:46]
Uh lastly in bylaw they've got a new
[2:51:48]
violation ticket maintenance module that
[2:51:50]
has been implemented. So that software
[2:51:53]
has been acquired. It's going to
[2:51:54]
streamline the violation ticket tracking
[2:51:56]
and monitoring process going forward. HR
[2:52:00]
is busy uh new hires for the manager of
[2:52:02]
infrastructure role. So uh we welcome
[2:52:05]
our new manager of infrastructure. Of
[2:52:07]
course there's ongoing recruitment
[2:52:08]
opportunities for ferry marshallers um
[2:52:11]
ongoing opportunities for auxiliary
[2:52:13]
custodial staff as well as um new meter
[2:52:16]
readers in the public works department.
[2:52:18]
We're supplementing their staff capacity
[2:52:21]
by hiring casual meter readers. And
[2:52:25]
there's always ongoing uh recruitment,
[2:52:27]
interviewing and and posting and filling
[2:52:30]
work going on there. Um
[2:52:33]
should be noted uh when we look at the
[2:52:37]
section of the report on the library, uh
[2:52:39]
the library bid a bond farewell to our
[2:52:42]
30 plus year chief librarian, Tina
[2:52:44]
Nielsen. Staff and council wish Tina a
[2:52:46]
happy and fulfilling retirement after
[2:52:48]
years of dedicated service in that role.
[2:52:50]
And I would like to take the opportunity
[2:52:53]
to welcome Jennifer Strechman to the
[2:52:55]
role as Bowen's new chief librarian.
[2:52:57]
She's working hard to develop new
[2:52:59]
programming and services to fill those
[2:53:01]
big shoes left behind by Tina and
[2:53:04]
Jennifer's here in attendance today. So,
[2:53:06]
thank you. Um, lastly, the work of the
[2:53:09]
strategic initiatives officer is
[2:53:11]
ongoing. Projects worked on and advanced
[2:53:13]
this quarter include the drafting of the
[2:53:15]
new purchasing policy, uh development of
[2:53:18]
a systemic ferry traffic data collection
[2:53:20]
process which is being used to gather
[2:53:23]
information uh about uh numbers of cars,
[2:53:27]
numbers of overloads that are left
[2:53:28]
behind. All pieces of data that we um we
[2:53:32]
can only really collect from this side
[2:53:34]
and that BC fairies I'm sure will be
[2:53:36]
keen to share um as we move forward.
[2:53:40]
There's initiation of a new solid waste
[2:53:42]
contract that will be kicking off the
[2:53:44]
two-year period where the municipality
[2:53:46]
will investigate the potential to join
[2:53:48]
with recycle BC in managing our
[2:53:50]
recycling streams. Discussions have been
[2:53:53]
taking place and are ongoing with Circle
[2:53:55]
Fairies to explore the feasibility of
[2:53:58]
new passenger onlyly ferry service in
[2:54:00]
the Cove. very high level discussions at
[2:54:02]
this point, but um they certainly have
[2:54:05]
indicated a keen interest to include
[2:54:07]
Bowen um as a stop off for their new
[2:54:09]
service.
[2:54:11]
Um and lastly, the library included a
[2:54:15]
summary of the programming and events
[2:54:17]
that have been taking place um at the
[2:54:19]
library, including very successful
[2:54:21]
summer reading club, implementation of
[2:54:24]
accessibility improvements to assisted
[2:54:26]
technology, including some new
[2:54:28]
computers, uh dedication of new spaces
[2:54:30]
for large print books, and it was
[2:54:33]
interesting, they provided comparative
[2:54:35]
statistics on business um on sorry, on
[2:54:37]
visits on the lending of books and the
[2:54:40]
man material. sales and electronic
[2:54:41]
lending, as well as the new items added
[2:54:44]
to the collection, which showed an
[2:54:46]
impressive year-over-year increase. So,
[2:54:49]
this report is included in the agenda.
[2:54:51]
It's comprehensive, it's easy, it's fun
[2:54:53]
to read, and I recommend taking a look
[2:54:54]
at it to learn about what is happening
[2:54:56]
and the work taking place by both
[2:54:58]
municipal staff, uh, department
[2:55:01]
managers, and our communications staff.
[2:55:03]
I thank them all for their work in
[2:55:05]
putting the report together and I would
[2:55:07]
like to give council the opportunity to
[2:55:09]
ask any questions of the senior managers
[2:55:11]
here today should you seek clarity or in
[2:55:14]
addition to the information on any of
[2:55:16]
the items included in that report.
[2:55:19]
>> Anybody got questions? Council for
[2:55:21]
Getty.
[2:55:22]
>> Um sorry with respect to the report on
[2:55:25]
recreation and in particular the bike
[2:55:27]
barn mural. Um, I want to give a shout
[2:55:30]
out to uh Jamie Schffer because this
[2:55:32]
young artist um Simeon Deutsch
[2:55:36]
Deutschinov
[2:55:37]
um came to the hearth and uh wanted to
[2:55:41]
replace a wall full of graffiti with uh
[2:55:43]
some of his art and um you may not it's
[2:55:47]
on page 12 of this report and the what
[2:55:49]
the mural it actually says the word
[2:55:51]
Bowen so it's it's contemporary art that
[2:55:56]
you might need a little help with but
[2:55:58]
it's one of our little symbols, the
[2:56:00]
deer, right in the middle of it. So, um,
[2:56:02]
both Jamie and Simeon figured out how to
[2:56:05]
go through the process. Um, this was
[2:56:07]
when the public art advisory committee
[2:56:09]
was was up and running. And, uh, it's it
[2:56:11]
was almost exciting to see it in the
[2:56:14]
report. It had been finished. So, shout
[2:56:17]
out to the artist and to, um, Jamie in
[2:56:20]
terms of getting this one completed.
[2:56:25]
» Whoops. Counselor F. Um, thank you. I
[2:56:28]
um, this is a question for the CEO. I
[2:56:31]
think did I hear you mention that the
[2:56:34]
electric circle ferry exploring circle
[2:56:38]
ferry in the cove or did you mean?
[2:56:43]
>> Uh, no. I I meant the cove. They
[2:56:45]
initially had a plan to head out to
[2:56:48]
Seymour Bay. I think with um the timing
[2:56:52]
of that development probably doesn't
[2:56:54]
align with their wish to um get some
[2:56:58]
kind of service going. So in the
[2:56:59]
interimm they're keen to look at Snug
[2:57:02]
Cove as a drop off point for foot
[2:57:04]
passenger air um service only. Thank
[2:57:07]
you.
[2:57:09]
>> Anybody else?
[2:57:11]
So, I can't resist
[2:57:14]
um asking the manager of environment,
[2:57:16]
[laughter]
[2:57:17]
has she had any confirmation on the
[2:57:19]
cougar?
[2:57:21]
[laughter]
[2:57:27]
» Thank you, chair, for the question. No,
[2:57:29]
we have not received any confirmation
[2:57:31]
about the um cougar's presence on the
[2:57:34]
island. Um currently, the last update we
[2:57:38]
gave was on July 8th. there is a um news
[2:57:42]
release that everyone can read to uh
[2:57:45]
that's that's the last update we've
[2:57:47]
received from conservation and um
[2:57:50]
nothing further on that.
[2:57:51]
>> Thank you.
[2:57:54]
>> Anybody else? So um we need um a motion
[2:57:58]
that uh council I I'll move that council
[2:58:01]
receive the 2026 quarter 2 quarterly
[2:58:03]
report as presented at its July 27th
[2:58:06]
2026 meeting for information.
[2:58:08]
>> Second.
[2:58:09]
>> Thank you. All in favor?
[2:58:10]
>> I.
[2:58:14]
» Okay.
[2:58:15]
>> Budget update.
[2:58:16]
>> Uh, thank you. Item 8.5 is a quarter 2
[2:58:19]
budget update. Um, I will like to start
[2:58:23]
this presentation off just with a quick
[2:58:25]
review of property tax collection
[2:58:27]
statistics. Um, in 2026, the total taxes
[2:58:32]
levied were just over $18.2 million. And
[2:58:35]
as of uh July 2nd, the due date, we had
[2:58:38]
collected um about 17.1 million. So
[2:58:42]
that's a collection rate of about 94%
[2:58:46]
which is um in line with previous years.
[2:58:48]
We range about 93% um of our taxes
[2:58:52]
collected by the due date. So that's
[2:58:53]
really good news. It shows that people
[2:58:55]
are um not not paying their taxes in
[2:58:59]
favor of paying other bills. they are
[2:59:01]
maintaining their um priority on paying
[2:59:04]
those property taxes of course because
[2:59:06]
it is a significant penalty for late
[2:59:08]
payments. So um I'm happy to see that is uh staying high. Um kind of
[2:59:14]
handinhand in that is the property tax
[2:59:16]
deferment statistics. Um it was very
[2:59:18]
interesting this year with the changes
[2:59:20]
to the provincial government's interest
[2:59:21]
rate on the deferment program. Um, last
[2:59:24]
year we had 293
[2:59:27]
uh applicants for the property tax
[2:59:29]
deferment program. This year it was
[2:59:31]
dropped way down by 43%. We had only 168
[2:59:36]
um applicants for the program this year.
[2:59:39]
Uh last year the amount deferred was
[2:59:41]
just over almost $1.9 million in
[2:59:44]
property taxes and this year it's with
[2:59:46]
the fewer number of applicants it's
[2:59:48]
dropped down to 1.1 million. So that's a
[2:59:50]
decline of as I said 43%.
[2:59:53]
um residents participating in the
[2:59:56]
program. And you can only chalk that up
[2:59:59]
to the change in the um very favorable
[3:00:02]
interest rate that until now the
[3:00:04]
provincial government had um had applied
[3:00:06]
to that program. Uh average deferral is
[3:00:09]
about $6,987.
[3:00:13]
Um so looking at our uh financial
[3:00:18]
results up till second quarter um we
[3:00:22]
have our taxation revenue taxation
[3:00:24]
revenue is very much in line with
[3:00:26]
budget. Um there was a change in the
[3:00:29]
number of folios between the preliminary
[3:00:31]
budget and the final budget. So there
[3:00:33]
was an overestimation of a few folios.
[3:00:36]
So, our our solid waste parcel tax
[3:00:38]
revenue is down by about $7,700
[3:00:41]
than what we had budgeted for. Um, there
[3:00:44]
are no other um property tax appeals
[3:00:47]
that are underway at the moment that um
[3:00:50]
that would indicate that we should be
[3:00:52]
concerned in any way about the property
[3:00:54]
tax revenue figure that we will um that
[3:00:57]
we will uh receive for this year. Other
[3:01:00]
fees and charges of course are
[3:01:02]
categories such as development fees and
[3:01:04]
business licenses, recreation revenue
[3:01:06]
and warf fees. Um I do believe that that
[3:01:10]
possibly could be a little bit lower
[3:01:12]
than budget. A couple of things um that
[3:01:15]
are driving that of course with this big
[3:01:17]
warf project that's going on and the
[3:01:19]
closure of the dock. I'm assuming that
[3:01:21]
we're going to have reduced um warf
[3:01:24]
revenue this year. So I put a provision
[3:01:25]
in for that as well as um we do have we
[3:01:29]
are noticing again a slowdown in b in
[3:01:33]
building activities. So I do believe
[3:01:35]
there's a possibility that we will not
[3:01:37]
meet our um our building permit revenue
[3:01:41]
target for this year but uh I do believe
[3:01:43]
that we should be close maybe about
[3:01:45]
$10,000 under. So uh all in all we'll be
[3:01:48]
very close on that line item. Our
[3:01:50]
federal grant revenue is typically tied
[3:01:53]
to specific projects. Um I do believe
[3:01:56]
that the OCP review process, we may need
[3:01:59]
to access some potential uh housing
[3:02:03]
potentially if we can access the housing
[3:02:05]
accelerator funds to fund any overages.
[3:02:08]
Um I do believe that we could uh require
[3:02:12]
use of almost up to $20,000 of that
[3:02:15]
funds in order to complete the OCP
[3:02:17]
review project. Other um uses of the
[3:02:20]
housing accelerator funds this year will
[3:02:22]
be 120,000 to complete the wastewater
[3:02:26]
treatment plant inflow and infiltration
[3:02:28]
program. We are um committed to
[3:02:30]
providing birch with $150,000 of funding
[3:02:34]
and as well uh they we do have set aside
[3:02:37]
$20,000 to complete the sewer DCC bylaw
[3:02:40]
project. Um fed provincial grants that
[3:02:44]
we'll be receiving this year. There's
[3:02:46]
about $132,000 left of Fires Smart
[3:02:49]
funding to support the coordinator
[3:02:50]
position as well as the assessments and
[3:02:52]
the rebates and the community events
[3:02:54]
that take place under that program.
[3:02:56]
$230,000 of funding approximately is
[3:02:59]
remaining towards the Eagle Cliff water
[3:03:01]
main portion of the project. Uh there's
[3:03:04]
about $50,000 funds remaining in the OCP
[3:03:08]
development approvals grant project.
[3:03:10]
About 25,000 of Spark grant funding was
[3:03:13]
received and used to finance the
[3:03:14]
accessibility component of this room and
[3:03:17]
$150,000 of Translink funding has been
[3:03:20]
included in the budget in order to
[3:03:22]
undertake the upcoming project to
[3:03:24]
improve trunk road.
[3:03:27]
Um I'll talk a little bit about our
[3:03:29]
other revenues. They include things like
[3:03:32]
late pay late payment penalties or
[3:03:34]
interest on unpaid taxes. Uh we do
[3:03:37]
believe that that should come in at
[3:03:39]
approximately 144,000 this year. Last
[3:03:42]
year it came in at 153,000. So not a
[3:03:46]
significant amount of variance
[3:03:47]
year-over-year.
[3:03:49]
And as well we do have um a couple of
[3:03:53]
other items in this revenue category
[3:03:55]
where there we we anticipate that we'll
[3:03:57]
have variances. One of them of course is
[3:03:59]
the fact that we are collecting money
[3:04:00]
and setting aside for the Knickknack
[3:04:02]
Nook building project. We've received
[3:04:04]
approximately $31,000 there, which we
[3:04:07]
are holding aside for the new building
[3:04:09]
replacement at the Knickknack Nook. And
[3:04:12]
we have approximately 16,000 of new
[3:04:15]
revenue that came through the public
[3:04:16]
works department as we are um
[3:04:19]
undertaking agreements with homeowners
[3:04:20]
who are encroaching on public property
[3:04:23]
to um um collect annual fees for the for
[3:04:26]
the right to continue that encroachment.
[3:04:29]
So that's um unbudgeted revenue and it's
[3:04:32]
a new program started this year. Our
[3:04:34]
investment revenue uh potentially could
[3:04:37]
be down. Um interest rates have stayed
[3:04:40]
lower than maybe um anybody anticipated
[3:04:43]
this year given the fact that there is
[3:04:45]
ongoing turmoil uh with tariffs with war
[3:04:49]
in Iran. um interest rates are likely to
[3:04:53]
increase for the second half of the
[3:04:55]
year, but so far they have managed to
[3:04:57]
stay quite low um for the first half of
[3:04:59]
the year. So I am putting a provision in
[3:05:02]
there that it is possible that we could
[3:05:04]
um not reach our investment income
[3:05:06]
target of 250 this year for the general
[3:05:08]
fund and and I've uh projected that to
[3:05:10]
perhaps be as low as 200. So um putting
[3:05:14]
those um you know those conservative
[3:05:17]
estimates in there means that we are
[3:05:21]
probably going to come in quite close on
[3:05:23]
our revenue targets
[3:05:25]
and nothing certainly that is going to
[3:05:27]
put us in any kind of financial um cons
[3:05:31]
concern if we um if we
[3:05:35]
nothing that's expected to put us in any
[3:05:37]
kind of financial concern. Our
[3:05:39]
operations expenses are um uh quite
[3:05:42]
close to budget uh for the most part our
[3:05:44]
fire and emergency which has a
[3:05:46]
significant potential budget variance
[3:05:48]
there. It's mostly related to the fact
[3:05:50]
that we have not received the grant
[3:05:53]
funding for the EOC program this year
[3:05:56]
nor the grant funding for the ESS
[3:05:57]
program this year. So um we're planning
[3:06:01]
uh to be under budget because we're not
[3:06:03]
going to be incurring the expenses
[3:06:05]
related to those grant-f funded programs
[3:06:07]
as well. So, we are taking a hit on the
[3:06:09]
revenue side, but we're taking an
[3:06:10]
offsetting hit on the um expense side as
[3:06:13]
well. Um public works has uh a little
[3:06:16]
bit of a delay in hiring. It's got some
[3:06:18]
other savings that we've um managed to
[3:06:21]
achieve from um like for example the ice
[3:06:24]
and snow purchases. Our we had a very
[3:06:26]
mild winter where we didn't do very much
[3:06:29]
plowing or sanding and we managed to
[3:06:31]
save some money there. there's potential
[3:06:33]
that we are not going to be spending all
[3:06:35]
of our arborous budget these years. I've
[3:06:37]
just estimated some some savings in some
[3:06:40]
of those line items and and all in all
[3:06:43]
adding all of those up, we could
[3:06:44]
possibly come in at about $100,000
[3:06:47]
savings in that budget line item this
[3:06:49]
year. Um
[3:06:52]
what else is a significant variance
[3:06:54]
there?
[3:06:55]
uh strategic planning is under that of
[3:06:58]
course has our contingency of
[3:07:00]
approximately $80,000
[3:07:02]
um included within that budget line item
[3:07:04]
and we have not um currently identified
[3:07:08]
a need for that contingency. So um if
[3:07:11]
all goes well to the end of the year, we would expect to be under budget in
[3:07:14]
that line item. Um as well in our
[3:07:19]
community and facility management
[3:07:21]
program uh we do budget for uh provision
[3:07:25]
for backfilling of the community center
[3:07:27]
manager. We um estimate that that all
[3:07:32]
sickness or vacation leaves will be will
[3:07:35]
be backfilled and um we've just managed
[3:07:37]
to kind of um do a minimum amount of
[3:07:40]
backfilling for those. So, we we do
[3:07:42]
potentially uh will see some savings in
[3:07:45]
that line item as well. Contributions to
[3:07:47]
reserves, they've all been posted as
[3:07:49]
budgeted. Um at the end of the year, any
[3:07:52]
unspent um any unspent operations will
[3:07:55]
also get posted to uh contribution to
[3:07:58]
accumulated surplus. I'll talk a little
[3:08:00]
bit about our capital expenditures. You
[3:08:02]
know, we spend the first three months
[3:08:03]
kind of developing our budget still. We
[3:08:05]
spend the next three months approving
[3:08:07]
the budget and we really get into the
[3:08:09]
bulk of the capital work in this period
[3:08:11]
right now. So, um I will have a much
[3:08:15]
more comprehensive expenditure report to
[3:08:18]
provide you at the end of Q3 when the
[3:08:20]
summer work um starts taking out.
[3:08:22]
There's a lot of RFPs that have recently
[3:08:24]
gone out are right in the process of
[3:08:26]
being awarded and we're going to be
[3:08:28]
undertaking significant portion of our
[3:08:31]
capital spending um at that time. So
[3:08:33]
next quarterly variance you will see um
[3:08:35]
the roll out of our capital program. Um
[3:08:38]
so I don't have anything else. I'm happy
[3:08:41]
to take questions about the report or um
[3:08:44]
provide any other information.
[3:08:51]
you commented on one thing in there that
[3:08:53]
we hadn't received the grants both for
[3:08:57]
um emergency ESS and
[3:09:01]
>> but they were both related to the
[3:09:02]
emergency program.
[3:09:03]
>> That's right. [clears throat] So every
[3:09:05]
year we apply for um an EOC an emergency
[3:09:08]
operations center grant of about between
[3:09:10]
30 and $40,000.
[3:09:12]
that was not um approved this year and
[3:09:16]
nor was the $30,000 grant that we
[3:09:18]
applied for to support our emergency
[3:09:21]
social support uh volunteer.
[3:09:23]
>> But none of that has any impact on um
[3:09:26]
>> bottom line
[3:09:27]
>> on on the um staffing or positions that
[3:09:31]
are in that emergency operations
[3:09:34]
section. No, we fund all of the staffing
[3:09:37]
um out of the municipal taxation budget
[3:09:39]
and the grants are extra events,
[3:09:42]
workshops, tabletop exercises, those
[3:09:44]
sorts of things that we would normally
[3:09:45]
undertake.
[3:09:46]
>> Anybody else got any questions?
[3:09:49]
So, I will move that um council receive
[3:09:52]
the 2026 quarter 2 quarterly report. Am
[3:09:57]
I getting the right one? At its as
[3:09:59]
presented at its July 27 No, just a
[3:10:02]
minute. Am I in the right one? No, I'm
[3:10:04]
not. Um, I would move that council
[3:10:06]
receive the 2026 quarterly 2 budget
[3:10:09]
update as provided at its July 27, 2026
[3:10:13]
meeting for information.
[3:10:14]
>> Yeah, second.
[3:10:15]
>> Second. Okay, we'll give councelor wake
[3:10:17]
that one. All in favor?
[3:10:20]
>> I
[3:10:23]
so 8.6. Lastly, uh the last update
[3:10:26]
report for council. Uh I just wanted to
[3:10:29]
give you uh a bit of an oversight of
[3:10:32]
where you're at with your strategic plan
[3:10:34]
objectives uh for this point in your
[3:10:36]
council term. Um
[3:10:39]
looking at the first uh area of
[3:10:43]
priority, those objectives related to
[3:10:46]
diverse and resilient community. Um
[3:10:48]
several of the objectives are going to
[3:10:52]
be complete are complete now or will
[3:10:54]
reasonably be complete um by the end of
[3:10:57]
the council term in the fall. Um for
[3:10:59]
example, the MRDT bylaw, you'll be
[3:11:02]
looking at a recommendation from the
[3:11:04]
planner coming forth at your first
[3:11:05]
meeting back in September as to whether
[3:11:08]
or not to move forward with that uh
[3:11:11]
municipal regional district taxation
[3:11:14]
bylaw.
[3:11:15]
um the wastewater DCC bylaw will be uh
[3:11:19]
we'll be looking at getting that done by
[3:11:21]
the fall. There is a developer meeting
[3:11:24]
uh a meeting with the development
[3:11:25]
community scheduled for September 21st
[3:11:28]
and that of course is um a bylaw that is
[3:11:31]
set to collect uh funds from new people
[3:11:35]
joining the wastewater system. So that's
[3:11:37]
been in the works for quite a long time
[3:11:39]
and that developer meeting is a key part
[3:11:42]
of that bylaw. Um ongoing and updating
[3:11:46]
things. Um we will be looking uh
[3:11:50]
probably in the new council term to
[3:11:52]
update uh the agreement with the hearth.
[3:11:55]
Um do a new agreement with family place
[3:11:58]
and as well as tourism bowen. That of
[3:12:00]
course is um dependent on the results of
[3:12:03]
the MRDT bylaw process. [clears throat]
[3:12:06]
So at the same time we are hoping to um
[3:12:09]
continue to work with BC fairies uh
[3:12:12]
moving towards um uh we do have of
[3:12:16]
course we do have a bylaw that has been
[3:12:18]
uh moved by council to three readings.
[3:12:21]
Um that is uh just on the on the council
[3:12:25]
agenda be looking at uh what council
[3:12:28]
wants to do with that bylaw in the fall.
[3:12:30]
But again, we are hoping to work with BC
[3:12:33]
fairies as our partner to improve safe
[3:12:35]
and orderly ferry marshalling in the
[3:12:37]
cove. Um, moving to the next area
[3:12:39]
priorities are the strong and
[3:12:41]
infrastructure asset management. A lot
[3:12:43]
of policy work um is going on there.
[3:12:47]
I have uh quite a few policies that are
[3:12:51]
um on my work plan. Most importantly,
[3:12:53]
redoing the planning and budgeting
[3:12:55]
decision-making policy. Um I expect that work will begin over the summer. Um
[3:13:01]
may not likely be uh complete by um
[3:13:05]
September. Um but that will be a new one
[3:13:08]
for council consideration in the new
[3:13:09]
term. Um work to roll out those asset
[3:13:13]
report cards. Um a significant amount of
[3:13:15]
work has been included um in that
[3:13:18]
project and we do believe that the uh
[3:13:21]
the road condition assessment will be
[3:13:24]
complete by the end of October 2026. So
[3:13:26]
having that report um will be um
[3:13:29]
instrumental in informing the director
[3:13:31]
of engineering's uh road plan for 2027.
[3:13:35]
Uh water master plan, the RFP is being
[3:13:38]
finalized. that will be going out um and
[3:13:41]
posted uh looking for submissions on
[3:13:43]
that um in the fall. and as will the um the report for
[3:13:51]
uh the
[3:13:54]
asset management plan. The overall asset
[3:13:56]
management plan RFP is also currently in
[3:13:59]
review and that will be posted very soon
[3:14:01]
in the next couple of weeks and um we'll
[3:14:03]
be looking to award that um in the fall
[3:14:06]
and work be um be underway on that
[3:14:09]
initiative.
[3:14:10]
Um
[3:14:13]
I think the new term can look forward to
[3:14:16]
development of the new solid waste
[3:14:18]
management strategy. The sewer outfall
[3:14:20]
project as I mentioned is underway
[3:14:22]
waiting for a permitting process but
[3:14:24]
that is probably one that that capital
[3:14:27]
project will be undertaken and and well
[3:14:29]
underway into the new council term in
[3:14:32]
the fall. And as well uh something that
[3:14:35]
is really um great to for me to be
[3:14:39]
reporting on is the work that's been
[3:14:41]
done on Cove Bay. So everything that we
[3:14:44]
can do internally given the plant as its
[3:14:47]
existing um capacity is working as
[3:14:51]
optimally as we can get it to get it to
[3:14:54]
operate. Um the work on the intake flush
[3:14:57]
has been completed which is creating a
[3:15:00]
much cleaner source of water going in
[3:15:01]
which produces a cleaner source of water
[3:15:03]
going out. Um work that needs to be
[3:15:06]
undertaken now is to develop some uh
[3:15:09]
potential technology for pre-treatment
[3:15:11]
and that um amount of work is what will
[3:15:14]
be going on and starting with the next
[3:15:17]
council in the new term. So, um looking
[3:15:20]
at improvements and upgrades to um to
[3:15:24]
address the quality of the water that
[3:15:26]
goes into the plant will, um we'll be
[3:15:31]
looking at ways to fund that, ways to uh
[3:15:35]
come up with options and will be part of
[3:15:38]
the budget process for the director of
[3:15:40]
engineering um come the fall. And
[3:15:43]
lastly, engaged community and infect and
[3:15:46]
effective government. Um these are items
[3:15:49]
that are really ongoing things. Um we
[3:15:53]
can always uh undertake programs and
[3:15:56]
practices that continuously uh you know
[3:15:59]
for continuous improvement to ensure
[3:16:01]
that the um community is engaged in our
[3:16:04]
government are more effective. So, one
[3:16:06]
of the things that has recently been um
[3:16:09]
adopted just today by council was
[3:16:11]
adoption of the new procurement
[3:16:13]
purchasing policy um as well as the
[3:16:17]
projects to install the interpretive
[3:16:19]
signage um on the westside beaches.
[3:16:21]
These are things that are complete tick
[3:16:24]
we can mark those off and then the
[3:16:26]
ongoing work of course cons um continues
[3:16:29]
to do the relationship building with
[3:16:31]
Squamish Nation. Uh we're looking at
[3:16:34]
moving the project forward to um
[3:16:36]
construct the welcome figure outside the
[3:16:38]
front of the um community center and as
[3:16:42]
well um implementation of accessibility
[3:16:45]
um uh implementation of the
[3:16:47]
accessibility plan is always going to be
[3:16:49]
an ongoing um project. Building
[3:16:52]
accessibility features into every new
[3:16:54]
project that we that we take on is just
[3:16:56]
going to be a new filter, a new lens
[3:16:58]
through which every project is is looked
[3:17:00]
at. Um
[3:17:02]
and for the last point, your responsible
[3:17:05]
ecosystem protection objectives. Um if
[3:17:08]
you want to mark off in the complete
[3:17:10]
box, we've got the um the MRDT tax which
[3:17:14]
will drive that tourism sector um to
[3:17:18]
develop new modes of of um
[3:17:25]
sorry uh finalizing the municipal land
[3:17:28]
zoning designation is the second point
[3:17:30]
that um council could put a check mark
[3:17:33]
box in complete and as well as
[3:17:35]
completion of the builder's workshop.
[3:17:37]
Then the ongoing things that will
[3:17:39]
probably carry forward into the new
[3:17:41]
council includes as I said ongoing
[3:17:44]
engagement with Squamish Nation
[3:17:46]
regarding the OCP um the septic the new
[3:17:49]
septic management bylaw and as well
[3:17:52]
looking at options to manage graywater
[3:17:54]
reuse. All of those uh little projects,
[3:17:59]
not little, but um all of those projects
[3:18:01]
will uh be ongoing things that the new
[3:18:04]
council will uh continue to work on in
[3:18:08]
the new term starting in 2026.
[3:18:12]
>> Any questions?
[3:18:14]
Councelor Gettys
[3:18:15]
>> on the last page under forest landscape
[3:18:18]
management um this is uh there's a word
[3:18:21]
at the very last under status of July 26
[3:18:24]
it says complete um but staff will
[3:18:27]
continue to explore alternative options
[3:18:30]
for stewardship of crownlands. I was at
[3:18:32]
one meeting and it was very interesting
[3:18:34]
and productive and um but there was a
[3:18:37]
lot of uh followup and homework. So I
[3:18:40]
would ask that you remove the word
[3:18:42]
complete
[3:18:44]
in that
[3:18:47]
>> one point.
[3:18:47]
>> I think it said complete because the
[3:18:49]
staff report had come back to council um
[3:18:52]
to uh provide the information about the
[3:18:54]
community for us. Um that's not to say
[3:18:57]
that that there aren't more.
[3:18:58]
>> I thought that was the start. [laughter]
[3:19:02]
>> Does the manager of parks and
[3:19:03]
environment have anything to add to that
[3:19:05]
one?
[3:19:07]
Um, thanks for asking. I think we just
[3:19:11]
put complete because we thought that uh
[3:19:15]
in terms of the council direction to
[3:19:17]
look into forest landscape plans that portion of the research was done
[3:19:23]
and that council had decided not to move
[3:19:25]
forward with the forest landscape plan
[3:19:27]
or a community forest and that the um
[3:19:30]
direction from council was then to kind
[3:19:32]
of shift into looking at different uh
[3:19:35]
methods for community uh stewardship of
[3:19:39]
properties.
[3:19:40]
Um I [clears throat]
[3:19:42]
though that the other that um the
[3:19:45]
meeting that we did have moved back a
[3:19:47]
little bit into community forest but I
[3:19:49]
think uh in terms of the council
[3:19:51]
direction that's not um what I have
[3:19:55]
currently
[3:19:56]
um so I would I would say for this
[3:19:58]
strategic plan that that item is
[3:20:04]
>> that's my recollection.
[3:20:06]
Anybody [clears throat]
[3:20:07]
else? Okay. So, I will move that council
[3:20:12]
receive the strategic plan status update
[3:20:15]
as presented at its July 27th, 2026
[3:20:17]
regular council meeting for information.
[3:20:20]
Second. All in favor? I.
[3:20:24]
>> Okay. All right. We're on new business.
[3:20:28]
Um Mayor Leonard isn't here on the Metro
[3:20:31]
Vancouver board meeting. Um but
[3:20:34]
interestingly there was a press release
[3:20:36]
that came out right after that and they
[3:20:38]
are going forward to the province for
[3:20:40]
the reduction of the size of the board
[3:20:43]
not the number of votes each
[3:20:45]
municipality has and I very quickly
[3:20:47]
looked at it. The board size will go
[3:20:50]
from 41 to 34 which means the city of
[3:20:53]
Vancouver is losing four representatives
[3:20:55]
but no no loss of votes and Siri is
[3:20:58]
losing three. So it it we and I think we
[3:21:02]
all saw the mayor of Suriri was on the
[3:21:04]
news I think not happy with that. Um so
[3:21:08]
that's all I know about that and anybody
[3:21:11]
know anything about Translink meeting?
[3:21:13]
No. Okay. Um islands trust update.
[3:21:19]
>> Nothing new for me. and the um the link
[3:21:21]
that was in the agenda of all of the
[3:21:23]
different little meetings of the um
[3:21:25]
local trust committees and um there
[3:21:28]
really isn't a whole lot of activity
[3:21:30]
going on with um with the trust um
[3:21:35]
for July and and parts of August.
[3:21:37]
There's some meetings coming up in terms
[3:21:39]
of planning things, but um it's a
[3:21:42]
summer. So,
[3:21:44]
>> I have a couple of things I can add.
[3:21:46]
[clears throat]
[3:21:47]
um uh trust council tried to hold a
[3:21:50]
committee the whole uh meeting last week
[3:21:53]
uh but we were short one of a quorum. So
[3:21:56]
that uh it was sort of um reviewing the
[3:22:01]
input received from agencies from the
[3:22:04]
formal referrals about the um update of
[3:22:08]
the trust policy statement. So that
[3:22:10]
meeting didn't happen. Uh we did have a
[3:22:12]
trust programs committee that um meeting
[3:22:14]
that I was in on um the Thursday and of
[3:22:18]
interest might be that uh islands trust
[3:22:21]
put together a webinar for realtors
[3:22:24]
about what is the island's trust so that
[3:22:28]
they can communicate that with people
[3:22:29]
wishing to purchase property and uh so
[3:22:32]
to reduce surprises and um uh and then
[3:22:37]
um I haven't looked at it yet. I've just
[3:22:40]
found out about it and uh financial
[3:22:42]
planning committee um is having a
[3:22:45]
meeting in mid August and uh I'll be
[3:22:47]
chairing that but I don't have any
[3:22:48]
information yet.
[3:22:52]
» Nobody else. All right.
[3:22:56]
>> I could just add to update council that
[3:22:58]
the work between the islands trust CFO
[3:23:01]
and myself is ongoing. We meet um
[3:23:03]
usually every Friday for an hour or two
[3:23:06]
and we're going over the Islands Trust
[3:23:08]
requisition allocation formula. So that
[3:23:10]
is um a very detailed process. It's a
[3:23:13]
good learning opportunity for the
[3:23:14]
Islands Trust CFO because they are new
[3:23:16]
in their role this year. So really
[3:23:18]
taking uh an opportunity to review all
[3:23:22]
of those budget line items and really
[3:23:23]
understand what's in them and help to
[3:23:26]
decide if that is something that should
[3:23:28]
appropriately be allocated to the
[3:23:30]
municipal pool or not. And um I just I
[3:23:32]
think that's very positive work that's
[3:23:34]
going on there.
[3:23:35]
>> Thank you. All right, I think we're down
[3:23:38]
to question period. I don't think
[3:23:41]
there's anybody in the audience. Nobody
[3:23:43]
online.
[3:23:44]
>> No.
[3:23:45]
>> Um motion to adjourn. John, Councelor
[3:23:48]
Saunders, Councelor Wake. Okay, the
[3:23:52]
meeting is adjourned. We've got a closed
[3:23:54]
meeting. Um, so 4:30