[0:01] You're watching BCTV. We're all about [0:05] Branford. [0:11] You're watching BCTV, Branford Government Television, a [0:15] service of Branford Community Television. [0:18] This program is brought to you in part through the support of the Town of [0:22] Branford. [0:26] I'm going to call this meeting to order. [0:27] Selectmen meeting, July 1st, 2026, at [0:31] 4:30 PM, at the Community Center on 46 Church Street. [0:36] Item number one, to consider, and if appropriate, approve the [0:40] Board of Selectmen minutes [0:42] from June 17th, 2026. [0:45] I'll move it. [0:46] Second. All those in favor? [0:48] Aye. [0:48] Aye. Item number two is executive session for tax [0:52] appeals, and item number three is to consider if appropriate, [0:56] approve proposed settlements of pending tax appeals. [0:59] We have none, so we're going to [1:01] just move past those [1:05] items. [1:06] Item number four, to consider and act upon the [1:10] recommendation of the tax collector and tax assessor [1:14] to approve a refund of motor vehicle late fees paid pursuant to [1:17] Connecticut General Statute [1:20] 12-129, based on an administrative [1:24] address record error affecting [1:27] issuance of a tax bill. [1:29] Motion to approve. [1:30] I second. [1:32] All those in favor? [1:33] Aye. [1:33] Aye. Motion carries. To consider, and if appropriate, [1:37] approve a request from Jennifer Aquino, assistant town [1:41] engineer, to waive the bid for permanent pavement patches [1:45] on call service pavement [1:49] parches, [1:50] the name of the company, I assume, Pavement Parches, on-call services, [1:54] and award the contract to William M. [1:57] Leyden Construction at the following prices: [2:00] asphalt patch per square foot at $7.46, [2:05] asphalt curb at [2:07] $13.47, asphalt [2:10] sidewalks [2:12] at $6.44, [2:15] and asphalt aprons at $6.44. [2:19] All of those are square foot prices. [2:25] Good afternoon. [2:27] Hello, Jen. [2:27] Jennifer Aquino, assistant town engineer, before you today for a [2:31] request for a bid waiver. [2:35] I'm sure you're aware William Leyden Construction has been our on-call paving [2:38] contractor since I've been in this role. [2:42] The last bid we did was a fiscal year '20 bid. [2:45] They were the low bidder for that. [2:47] For four years following that, as allowed by contract, they extended their [2:51] bid with no cost increase. [2:54] In fiscal '25 and fiscal '26, [2:58] they extended their bid with a requested 3% [3:01] escalation, which was awarded by the Board of Selectmen during those two fiscal [3:05] years. The company has once again requested to extend their [3:09] contract, and have asked for a 3% escalation, [3:13] which results in the pricing that First Selectman Brooks just went over. [3:18] When reviewing their request, we take a look at a lot of factors, and [3:22] one of those is [3:24] DOT's weekly asphalt monitor, which I gave you a [3:28] copy of with the package. That lists the [3:31] average cost of asphalt for [3:35] every year [3:37] for these contract years. I broke it down with just per year. [3:39] So the average cost, there's the high and the low is there, but the average is what [3:43] I was looking at when determining whether or not this was advantageous for [3:47] the town to continue this contract. [3:50] As you can see, [3:52] from the time that our bid was put out and they won their original [3:56] award, there's been [3:58] over a 34% increase in asphalt prices. [4:01] So I thought it was prudent of us to entertain the [4:05] request with this minimal increase of 3% [4:10] in order to keep this contract going. [4:12] I called around a couple of different towns. [4:14] They're seeing significant price increases with their recent bids. [4:19] And we're like, "Wow, you're getting a really good price for what you're [4:23] getting." [4:25] So I'm here before you today for this request. [4:27] And I think one of the key points with this particular [4:32] type of work that we do, this is asphalt patches that we do, [4:35] curbing, driveways, sidewalks, different items that we use [4:39] from the town's perspective for our work, but this also [4:43] includes work when a homeowner has work done and has a [4:47] water connection done or sewer connection done. [4:49] This pricing is what the homeowner is directly charged for the repairs [4:53] that the town does. [4:55] From our contractor, they put a bond up when they get the excavation permits. [4:59] Our contractor does the repair work to ensure that that's done to our standards, [5:03] and then we pass that cost directly on to the homeowner. [5:05] So this isn't just the town's project. This is also direct cost to homeowners. [5:09] So it's kind of prudent for us to try and keep those costs as low as we [5:13] can. And I definitely feel that if we were to go out to bid this year, the cost [5:17] would significantly increase. [5:19] We were seeing costs in the $10 per square foot at the [5:23] time this bid was done in fiscal '20 by the other contractors that [5:27] didn't win. So I can only assume that that would be [5:30] significantly more than the pricing that they've offered us for this [5:34] contract again. [5:38] Any questions? Any other questions? [5:39] Jen, thanks for your due diligence on this. [5:41] I think it's [5:43] excellent, and I would agree to move forward. [5:46] I'm good. [5:48] They do good work. Can I get a motion? [5:49] I'll make a motion to approve. [5:50] Second. All those in favor? [5:52] Aye. [5:52] Thank you. Motion carries. Thank you. [5:54] Thanks, Jen. [5:59] Okay, item number six, to consider, and if appropriate, approve [6:04] A request from Blaise Levitan, Board of Ed Chief Operating [6:08] Officer, and Brendan Letty, Board of Ed Facilities Director, to waive the [6:12] bid for fiscal year '26, '27 electrical [6:16] projects at Branford High School, and authorize the work to be [6:19] performed by McMillan Electric using the pricing and terms [6:23] as identified in contract 7214 between [6:27] McMillan J. Orris LLC and the town of [6:31] Greenwich, dated February 8th, 2028. [6:37] Hey, everybody. How's it going? [6:38] 2020, sorry. [6:38] Yeah. [6:39] 2020. [6:40] '22. [6:41] '22. [6:41] '22. Yep. I know there was an addendum in there. [6:44] Yeah, so good afternoon, everybody. Good to see you. [6:47] Never great following Jen, [6:51] but [6:52] we will try our best. [6:54] So we're back before you with a fairly similar request. [6:57] And just for the public's background that's watching, we came [7:01] here in February for a bid waiver under the same [7:05] contract for a very specific project at the high school to do the [7:09] switchgear. [7:10] At the same time, we were working with the [7:14] town administration on the solar project at the [7:18] high school, and we ended up shifting gears from in [7:22] front of the meter to a behind-the-meter approach that's now well [7:26] underway, and that drives a lot of other decisions. [7:30] So that project that we came before you to upgrade all of the switchgear [7:34] this summer was put on hold and will now be part of a [7:38] larger [7:39] project that will be looped in with the cogen, [7:43] and HVAC system replacement, as well as the [7:46] solar. [7:48] And so that way we can do some more engineering, building committee project. [7:52] What we're doing instead, [7:54] hopefully this summer, would be all of the ancillary [7:58] electrical components in the building instead, so that we can still stay on [8:02] schedule for electrical upgrades overall. [8:04] They'll still be done in tandem. And so [8:08] we're looking to really basically similarly issue an [8:11] award under the town of Greenwich contract pricing, [8:15] for the high school for the year, with the bulk of those [8:19] projects being specifically completed [8:22] this summer. Brendan is going to mention a [8:26] few of those high-level projects. I also put them in the memo. [8:30] For checking on pricing, so McMillan is based [8:34] out of Stratford, Connecticut, and they have [8:37] had a very competitive contract we attached. [8:41] We have the approval from both [8:43] the town of Greenwich, [8:45] and McMillan to use this [8:48] town contract. They still comply with all of our own [8:52] insurance and our terms as well, but they've honored the pricing. [8:56] We included in here the alternative, too, [9:01] with the state contract that they have. [9:03] That's the piggyback for electrical pricing for all [9:07] towns to piggyback on, and we are obviously [9:10] substantially lower per hour than the [9:14] state contract. [9:16] The Greenwich project, it's not like it didn't go through a competitive bid process [9:19] as well. So it went through a competitive bid [9:22] in Greenwich and this price is very [9:27] strong. Brendan's looked around with other [9:31] opportunities, similar to what Jen was just mentioning about [9:35] people who are honoring prices from basically that are built on a [9:39] base of 2022, [9:41] instead of this escalation that you've really seen in the last few years. [9:44] So we're able to take advantage of that. [9:47] And so that's the logic behind the request in a [9:51] summary. For additional context, that [9:56] switchgear project [9:58] that we were going to do this summer, the nice thing is, is by pivoting it and [10:02] tying it to the HVAC and [10:06] the [10:08] power system of the building, we're able-- Typically, just [10:12] replacing switchgear on its own because it's [10:16] old and no longer at its useful life is not an [10:19] eligible reimbursable expense in the school construction grant project, [10:23] but HVAC and core mechanical systems are. [10:26] And what we've been doing is working with our professional team to really [10:30] line up [10:32] including it so that it can be justified as part of that bigger renovation on [10:36] the HVAC. So that portion of the project we [10:39] anticipate to be now, since we're going to do it connected [10:43] to and make the case that it's part of the power system, specifically of the [10:47] building, and it powers the core HVAC components that we'll be [10:50] replacing. We'll be able to get the state reimbursement on the [10:53] non-priority grant back on top of doing it. [10:57] So there's actually a two-step benefit, so it really connects [11:00] the behind-the-meter approach that First Selectman Brooks [11:04] has led, which is working out. [11:07] Overall, the timing and everything hopefully will sync up well, and [11:10] then we're able to lump that into that bigger project for the [11:14] 37% reimbursement rate back on that, too. [11:17] So [11:18] I don't know if you want to give any additional context about this specific project [11:22] and what they're doing at the high school. [11:23] No, as Billy said, we're working on a lot of projects this summer. [11:26] A lot of these projects that the electrical team is focusing on are [11:30] improving safety, security, [11:34] and then core [11:37] teaching elements, in our kitchen, in our CNA program. [11:40] We're addressing some of these much-needed electrical upgrades in those areas. [11:46] We've looked around. It's hard to beat a $68 an hour [11:51] electrician these days. [11:53] So he just partially answered the question. [11:57] You did look around already, so everyone knows four different pricing. [12:01] This was still the best pricing. [12:03] Well, state contracts just says it's $80 an hour according to the presentation. [12:07] Right. I often found, unfortunately, using state contracts in the past, [12:11] that they're higher than- [12:12] Right [12:12] ... we can get otherwise. So it [12:15] seems to be convenience [12:17] For us to look at state bids sometimes, but they are not- [12:20] Right [12:20] ... the best prices. [12:20] I agree. That's a good comparison. Is that $80 based on a prevailing wage? [12:24] Do you know, Brandon? [12:25] It is. [12:25] It is. [12:26] Yeah. [12:27] Yeah. [12:27] But we have had [12:30] other electricians in the building. [12:31] We've had other costs even on smaller projects where we may [12:35] have a general contractor working. [12:38] They're going to hire their own electrician. They're not being $68 an hour. [12:41] Right. [12:41] So oftentimes we're bringing in even McMellen. [12:43] We may have a general contractor to frame out an area, build something, and then [12:47] we're bringing in our own electrician just to save that money as well. [12:50] Yeah. [12:50] Now, right now, [12:53] because obviously [12:55] you're trying to get this done this summer, [12:57] are they already in the building doing other work where they can just transfer [13:00] over? [13:02] We only got a two-month window here, and this is kind of late for [13:06] us [13:07] to be approving a bid waiver. But I'm assuming you had to wait for funding [13:11] anyway. [13:12] But this is going to be able to get done in this time period, the project you [13:16] want- [13:16] Yes [13:16] ... by us doing this tonight? [13:18] Yes. [13:18] Okay. [13:19] It's not necessarily late. It was a little bit of back and forth between the state [13:23] contract and how we were finding the funding. [13:27] So we've gone through, both with myself, our technology [13:31] director, our director of security, which is where a lot of these projects are [13:34] coming from. We walked the building with McMellen. They took a list. [13:37] They provided several quotes for us. [13:40] And now their main foreman is on vacation this [13:44] week for the 4th of July holiday, and then they are dedicating, essentially [13:47] starting next week through the end of the summer, they will have electricians on [13:51] site nearly every day. [13:52] That's what I was looking for. They're ready to go. [13:53] Ready to go. On site, they have material all ready to go. [13:56] They have a material list. They've run through everything. Yep. [13:58] Thanks. [13:59] Yeah. [13:59] I like the way you piggybacked on Brandon's spot. I would like to move this. [14:02] Second. [14:04] All right. All those in favor? [14:06] Aye. [14:07] Thanks, guys. [14:08] Aye. [14:08] Thanks. Appreciate it. [14:08] Thank you very much. Appreciate it. [14:09] Much obliged. [14:12] Good to see everybody. [14:13] Take care, boys. Have a good holiday. [14:14] See you. You too, man. [14:17] Peace. Not much space for my computer. [14:21] Okay, item number seven, to consider, and if appropriate, approve a request [14:25] from Gino Carano, acting superintendent [14:28] WPCF, to waive the bid for the purchase of two [14:32] replacement 45-horsepower flight [14:35] submersible dry pit pumps for the Damascus Road pump [14:39] station and award the contract to Fleet Pump and Service Group, [14:43] Inc., in the amount of $128,390. [14:48] Just to give you guys background, this is similar to last month or [14:52] two weeks ago, we did the same thing. [14:54] This is the rest of those pumps in that pump station. [14:59] It's replacing [15:01] pump to pump. So getting multiple pricing makes no [15:05] sense because you want the same pump doing the same job. [15:09] I'm good with it. You did- [15:10] I am, too [15:10] ... due diligence last month. [15:12] Yep. I'll move it. [15:13] I think we should just move it. [15:14] Okay. All those in favor? [15:15] Aye. [15:16] Aye. [15:16] All right. Motion carries. [15:18] Thank you very much. [15:18] Thanks. [15:19] Item number eight, green use, to consider, and if appropriate, approve a [15:23] request from the Society of Nepalese in America for [15:27] the use of the town green on July 18th, [15:30] 2026, to hold the Nepal Festival, [15:33] Nepal Day Parade from 10:00 a.m. to 4:00 p.m. [15:38] This- [15:40] I'll move it. [15:40] I'll second. [15:41] Any discussion? [15:43] All those in favor? [15:44] Aye. [15:45] Aye. [15:45] Motion carries. [15:47] Item number nine, correspondence. We have none. [15:50] Item number 10, other. Is there anything else [15:54] to come before us? [15:56] Okay. Item number 11, adjournment. [15:58] I'll move it. [15:58] Can I get a motion? [15:59] Second. [16:01] All those in favor? [16:02] Aye. [16:03] Aye. [16:03] We're adjourned. [16:05] This program was brought to you in part through the support of the town of [16:09] Branford. [16:11] Watch town meetings and other videos on demand at [16:14] branfordtd.org.