1 00:00:02,100 --> 00:00:10,780 A great deal with the logistics of these meetings, and we certainly want to thank them for all being so helpful. We appreciate that very much. 2 00:00:11,640 --> 00:00:18,700 These facilities do have Wi-Fi available for those who have cell phones, laptops and tablets. 3 00:00:19,820 --> 00:00:27,780 If you wouldn't mind, we would ask you to please turn them off to the silent mode and deference to your proceedings. 4 00:00:27,780 --> 00:00:35,800 For those of you who wish to speak to the Board, we have speaker slips, the forms are in the lobby, 5 00:00:36,500 --> 00:00:43,100 prior to the entrance to the chambers, please fill out the form and give it to one of our staff members, 6 00:00:44,500 --> 00:00:46,800 and they'll get it to us so that we can hear. 7 00:00:46,980 --> 00:00:55,300 Please read the mark, the number of the item you want to address, so that we can call on you 8 00:00:55,300 --> 00:01:03,420 the meeting for when the item comes up and we can call on you on that item. 9 00:01:03,840 --> 00:01:09,340 If you are anticipating speaking to the Board, I'd suggest that you would read the notes 10 00:01:09,340 --> 00:01:15,400 on the agenda so that you're properly prepared, prior to making your presentation. 11 00:01:17,840 --> 00:01:24,020 Members, I do believe that depending on circumstances this morning, we may have a rather light 12 00:01:24,020 --> 00:01:30,120 agenda. Therefore, I'm anticipating a journey in this meeting around one o'clock or so. 13 00:01:30,620 --> 00:01:39,180 We don't have according to our council. We don't have a closed session today. However, I am mindful 14 00:01:39,180 --> 00:01:44,200 that we have several board members that have been important flood board related meetings 15 00:01:44,200 --> 00:01:49,900 in the afternoon, and I want to accommodate their needs. Also, for your information, 16 00:01:49,900 --> 00:01:56,580 And Leslie has a 11 o'clock budget subcommittee meeting at the Capitol and she'll be leaving 17 00:01:56,580 --> 00:02:03,940 and I'm assuming Michael will take her place as the staff here. 18 00:02:05,040 --> 00:02:12,460 Regarding the agenda items themselves, Vice President and Secretary Jane Dolan under 19 00:02:12,460 --> 00:02:19,900 item three will be presenting the minutes of the November 22nd regular board meeting for your 20 00:02:19,900 --> 00:02:25,320 approval. The approval of the minutes obviously is an action item that will be taken this morning. 21 00:02:25,900 --> 00:02:33,680 Next we have our consent calendar which is item five and has two items on it. To my knowledge 22 00:02:33,680 --> 00:02:39,280 these two items are in order and therefore unless someone decides to remove one of the items 23 00:02:39,280 --> 00:02:46,940 5A or 5B from the agenda, or the public decides that the an item should be removed. 24 00:02:46,980 --> 00:02:53,740 These will be approved in one motion from the board. 25 00:02:55,140 --> 00:03:00,340 Obviously, this will be an action item for the board that's the consent calendar. 26 00:03:00,420 --> 00:03:07,600 Next item, 7, Nancy Vogel has graciously agreed to present the recently released 27 00:03:07,600 --> 00:03:15,060 Governor's water resiliency portfolio to the board, more pleased about that and having 28 00:03:15,060 --> 00:03:22,160 her at the board meeting and this meeting streamed is very helpful and we appreciate 29 00:03:22,160 --> 00:03:23,740 her doing that. 30 00:03:24,020 --> 00:03:30,320 Next under item eight, Darren Sue and we'll brief us on the proposed legislation that's 31 00:03:30,320 --> 00:03:38,180 now addressing the damaged actions to our public infrastructure, particularly our levees, 32 00:03:38,800 --> 00:03:44,800 that we've been made aware of and has been the subject of some media attention. Under 33 00:03:44,800 --> 00:03:51,200 that same item, Durham is also going to brief us on the governor's recent executive order, 34 00:03:51,360 --> 00:03:59,640 which relates to the use of surplus property, which Sacramento San Joaquin District has property, 35 00:03:59,640 --> 00:04:05,300 and we are affected by that executive order, so he will brief the board on that. 36 00:04:05,780 --> 00:04:12,780 Next under item nine, John Passes, sub-situting for Jeremy, he's going to be at the same meeting 37 00:04:12,780 --> 00:04:21,400 that Leslie is subcommittee on the budget this morning, so John has is going to be sitting in 38 00:04:21,400 --> 00:04:26,400 and John Pash and Michael Wright will be filling in 39 00:04:26,400 --> 00:04:32,600 when assuming do a great job while the first team 40 00:04:32,600 --> 00:04:34,880 for stringer over at the capital. 41 00:04:36,380 --> 00:04:38,940 Under item 9A, John is going to present 42 00:04:38,940 --> 00:04:41,240 the Division's Normal Monthly Report, 43 00:04:41,240 --> 00:04:46,680 regarding ongoing activities that have the Division 44 00:04:46,680 --> 00:04:49,720 Project Updates reach an events that have occurred 45 00:04:49,720 --> 00:04:57,460 since last month, then under Item 9B, President Schoppwell from our staff at Wade Wiley and 46 00:04:57,460 --> 00:05:06,140 Sikastah Donovan from DWR will provide the annual inspection briefing from 2019 inspection 47 00:05:06,140 --> 00:05:19,700 and LMA local meeting agency reports, and we're always interested in that trying to see how 48 00:05:19,700 --> 00:05:23,380 and maintenance of our levees system, 49 00:05:23,640 --> 00:05:26,300 which we've placed a high priority on. 50 00:05:27,020 --> 00:05:30,060 Also, under this item, John's items, 51 00:05:30,560 --> 00:05:33,300 9C, Dave Wilden, will provide an update 52 00:05:35,160 --> 00:05:38,120 on the state and federal rehabilitation work 53 00:05:38,120 --> 00:05:43,040 resulting in the result of the storms of 2017 and 19. 54 00:05:43,320 --> 00:05:44,980 A lot of work to be done there, 55 00:05:45,120 --> 00:05:47,900 and John's done a good job of getting those 56 00:05:47,900 --> 00:05:53,160 working with the core and getting those jobs to bid and underway. 57 00:05:54,380 --> 00:06:02,380 And finally, under item 90, Kyle Bickler from DWR, who's working with in Christian 58 00:06:02,380 --> 00:06:08,740 L's area of responsibility in the department, will provide an informational briefing on 59 00:06:08,740 --> 00:06:14,500 the proposed 7-mile levies setback, project along the north bank of the Sacramento 60 00:06:14,500 --> 00:06:17,540 bypass and the East Bank of the Yellow bypass. 61 00:06:18,420 --> 00:06:24,840 This levy setback will require an encroachment permit from this board that will be on our 62 00:06:24,840 --> 00:06:26,300 agenda next month. 63 00:06:27,000 --> 00:06:31,820 In under item 10, which are the board ions, we have three items to the board's consideration 64 00:06:31,820 --> 00:06:32,960 this morning. 65 00:06:34,640 --> 00:06:39,120 If item 10A looks familiar, it is. 66 00:06:39,740 --> 00:06:42,700 This is an item that we looked at before. 67 00:06:43,860 --> 00:06:49,280 The property owner has asked that he appeared before the board and talked to the board 68 00:06:49,960 --> 00:07:00,040 about this item and the issue before the board is whether this application in its redesigned 69 00:07:01,120 --> 00:07:15,120 Configuration will make sense to proceed with staff review and new application, or the old existing application as it applies to this new application. 70 00:07:16,640 --> 00:07:28,220 Next under item 10B, we have another resolution of necessity that Joe Bartlett and Matt Degroot of the Department's Division of Engineering will present. 71 00:07:28,220 --> 00:07:37,660 And then under Item 10C, Connie Perkins of our staff, and Paul Bruner of three Rivers 72 00:07:38,520 --> 00:07:43,900 Improvement Authority will provide us with an informational briefing on the proposed 200 year 73 00:07:43,900 --> 00:07:48,280 goal fields, Levy Project, by the authority they're proceeding. 74 00:07:48,820 --> 00:07:55,800 Then under Item 11, 12, 13, we have our usual Executive Officers reports, including informational 75 00:07:55,800 --> 00:07:56,760 staff reports. 76 00:07:56,760 --> 00:08:03,380 We also will have the normal board comments, committee updates, and calendar for everyone's 77 00:08:03,380 --> 00:08:03,900 certification. 78 00:08:04,960 --> 00:08:11,120 Finally, again, we do not have a close session this morning, but notwithstanding that this 79 00:08:11,120 --> 00:08:12,480 is going to be an interesting meeting. 80 00:08:12,580 --> 00:08:14,780 A lot of interesting subjects on it. 81 00:08:15,040 --> 00:08:21,680 As I say, we should be journeying around one o'clock, so I think we'll try to go straight 82 00:08:21,680 --> 00:08:24,080 through, rather than having a recess for lunch. 83 00:08:24,960 --> 00:08:33,180 Okay, under item one, introductions and announcement, Leslie, I understand we have a new board member. 84 00:08:34,000 --> 00:08:39,140 If you wouldn't mind, please tell us about it in the background of the background. 85 00:08:39,740 --> 00:08:41,840 Yes, good morning, Mr. President. 86 00:08:42,160 --> 00:08:47,620 Good morning, everyone, for those of you who have not yet heard the governor did announced yesterday that our attorney 87 00:08:47,620 --> 00:08:50,580 Board member vacancy has been filled. 88 00:08:50,580 --> 00:08:56,600 Brian Johnson from San Francisco has been appointed to the board to fill the attorney slot. 89 00:08:57,340 --> 00:09:01,080 He has been the California Director at Trout Unlimited since 2011. 90 00:09:02,020 --> 00:09:06,700 He was the Director of the California Water Program there from 2005 to 2011. 91 00:09:07,700 --> 00:09:13,800 He was an Associate at Shoot, Mahaley, and Wineberger from 2002 to 2005, an Associate 92 00:09:13,800 --> 00:09:19,840 Director for Communications at CEQ, which is the Council on Environmental Quality with the 93 00:09:19,840 --> 00:09:27,320 in his office and that was from 93 to 97. He was the manager of energy star computers for the 94 00:09:27,320 --> 00:09:34,200 U.S. environmental protection agency and in the office of Air and Radiation from 91 to 93. 95 00:09:34,660 --> 00:09:40,800 He does hold a J.D. nurse doctorate from Stanford Law School and he will be joining our board 96 00:09:40,800 --> 00:09:47,060 probably for next month's meeting. So welcome to Brian and we'll look forward to having a full 97 00:09:47,060 --> 00:09:51,900 to board members. I also have a couple of staff announcements, Mr. President. 98 00:09:52,880 --> 00:09:57,840 We have two new staff members with us today. First of all, in our inspection section, 99 00:09:58,000 --> 00:10:03,820 we have Priscilla De LaMère. I see her out in the audience waving. She joined us. She comes to 100 00:10:03,820 --> 00:10:11,060 us from the state water project at DWR. She performed modeling analysis and has a lot of experience 101 00:10:11,060 --> 00:10:16,240 with reservoir releases, how they affect river stages, elevations. She's graduated from 102 00:10:16,240 --> 00:10:21,660 UC Berkeley has a BS in chemical engineering and does have her engineering in training certificate 103 00:10:21,660 --> 00:10:29,340 currently working to take the PE exam. So welcome to Priscilla. We also joining us in our 104 00:10:29,340 --> 00:10:35,580 enforcement section, David Ismailion. He has five years experiences he and the audience with us. 105 00:10:35,680 --> 00:10:39,700 There he is next to John. He has five years of experience as a regulator with the California 106 00:10:39,700 --> 00:10:46,760 energy commission and there he was responsible for enforcing compliance of energy efficiency regulations, 107 00:10:47,660 --> 00:10:52,900 investigating leads for potential violations and research and review of technical test reports. 108 00:10:53,080 --> 00:10:59,380 He was a project manager over saw key contracts so we are happy to have him. 109 00:11:00,960 --> 00:11:07,140 He has a bachelor's degree in civil engineering from sex state and also has his EIT or engineering 110 00:11:07,140 --> 00:11:13,280 in training certificate and is working to get his P.E. so welcome to David as well. 111 00:11:16,360 --> 00:11:17,280 Those are all the announcements. 112 00:11:17,500 --> 00:11:22,980 Okay, thanks Leslie and welcome to the two new staff members. We're happy to have you aboard 113 00:11:22,980 --> 00:11:27,580 and thanks for coming to the meeting to watch this wonderful proceeding. 114 00:11:29,680 --> 00:11:32,160 Okay, we're on item number two, 115 00:11:32,540 --> 00:11:38,280 which is the roll call and establishment of a quorum. Ryan, would you read the roll and 116 00:11:38,280 --> 00:11:40,440 and determine whether or not we have more 117 00:11:40,440 --> 00:11:41,640 and if we conduct our business. 118 00:11:42,120 --> 00:11:45,080 Board Member Ramirez, Board Member Velines, 119 00:11:45,980 --> 00:11:48,640 Board Member Countryman, Board Member McDonald, 120 00:11:49,660 --> 00:11:52,480 Vice President Dolan, President Edgar. 121 00:11:53,260 --> 00:11:55,320 I'm here also, we have a full board this morning. 122 00:11:55,420 --> 00:11:56,200 Thank you, Members. 123 00:11:57,040 --> 00:11:57,880 That's great. 124 00:11:58,400 --> 00:12:03,000 We're on item three, the minutes of our November 22nd, 125 00:12:03,020 --> 00:12:05,900 regular board meeting for everyone's information. 126 00:12:05,920 --> 00:12:07,400 This is an action item. 127 00:12:07,400 --> 00:12:12,100 Mr. Dolan, our board vice president and secretary has this item. 128 00:12:13,020 --> 00:12:14,140 Mr. Dolan, the floor is yours. 129 00:12:16,240 --> 00:12:17,380 Thank you, and good morning. 130 00:12:19,020 --> 00:12:24,300 I don't know about the rest of you, but for me this year of 2020 started at 90 miles an hour. 131 00:12:25,060 --> 00:12:27,660 And I really can't believe it's nearly the end of the month. 132 00:12:28,880 --> 00:12:33,440 So that means that you all received the minutes a few days later. 133 00:12:33,760 --> 00:12:36,420 It was on the 22nd for the November. 134 00:12:36,420 --> 00:12:40,700 I know you all read them. I appreciate that. Catching anything I might have missed. 135 00:12:41,780 --> 00:12:46,260 I think they're in order, but let me just pause to see if any of you have inputs or questions. 136 00:12:47,540 --> 00:12:49,420 Or anyone else? It's been a time reading the minutes. 137 00:12:52,000 --> 00:12:57,100 I see none. So I will move approval of the meeting minutes for November 22nd, 2019. 138 00:12:58,080 --> 00:13:07,740 Okay, so you know, objections to the minutes, moved by Ms. Dolan seconded by McDonald's, 139 00:13:07,740 --> 00:13:08,320 all in favor? 140 00:13:08,740 --> 00:13:09,320 Right. 141 00:13:09,320 --> 00:13:09,820 Opposed? 142 00:13:10,240 --> 00:13:11,280 Okay, the minutes are past. 143 00:13:11,420 --> 00:13:14,400 Thank you, Jane, for doing that work so quickly. 144 00:13:16,460 --> 00:13:22,760 We're on item number four, review of the agenda, and Leslie, I've asked you to, we've 145 00:13:22,760 --> 00:13:26,520 the agenda for us and indicate any items that I may have missed. 146 00:13:26,840 --> 00:13:27,640 Thank you, Mr. President. 147 00:13:28,160 --> 00:13:30,620 We do have one request from the department. 148 00:13:31,120 --> 00:13:37,240 We received a message from Dave Wilden on item nine. 149 00:13:41,540 --> 00:13:51,580 We are putting a summary report on the board and DWR website that relates to this presentation and wanted to have it posted when the presentation is given. 150 00:13:51,580 --> 00:13:57,100 Additionally, more internal reviews have been requested that will not happen before the January meeting. 151 00:13:57,720 --> 00:14:00,620 So they are requesting that the site and be removed from the agenda. 152 00:14:01,580 --> 00:14:14,480 That item will be item 9C, the drainage report from Dave Wilson will be postponed to, I guess, next month is what he's saying. 153 00:14:15,520 --> 00:14:16,460 It's unclear. 154 00:14:17,280 --> 00:14:27,660 All right, okay, we're on to item 5, which is our consent calendar. 155 00:14:28,480 --> 00:14:35,860 As I said earlier, unless someone on the board or the public want to remove any item from 156 00:14:35,860 --> 00:14:43,160 the consent calendar, these are items 5A and 5B, we will be approving both those items in 157 00:14:43,160 --> 00:14:53,520 single vote. Does anyone on the board want to remove 5A or 5B? Okay. Michael, the staff's 158 00:14:53,520 --> 00:14:58,760 okay on both those items at this point. Yeah, both of those items are okay. Anybody from 159 00:14:58,760 --> 00:14:59,840 of the public when I remove. 160 00:15:00,000 --> 00:15:09,200 5A or 5B for further discussion. Okay, back to the board. Mayor, please have a motion and second on the two items on the 161 00:15:09,200 --> 00:15:10,040 consent calendar. 162 00:15:12,140 --> 00:15:21,720 Okay, moved by countrymen, second by Dolan that the items 5A and 5BB approved as submitted. This is an action item, all in favor. 163 00:15:24,600 --> 00:15:27,260 Okay, the two items pass, thank you, members. 164 00:15:28,360 --> 00:15:34,660 Members were on item six, public comments, is there anyone in the audience regarding that 165 00:15:34,660 --> 00:15:38,040 wants to speak to the board of items not on the agenda? 166 00:15:38,560 --> 00:15:48,740 Not on the agenda and we have one that looks like Melinda, I think you're the only one 167 00:15:48,740 --> 00:15:52,800 wants to speak on so far on this right? 168 00:15:53,180 --> 00:15:53,660 Good morning. 169 00:15:54,280 --> 00:15:55,520 Wow, I feel so short. 170 00:15:58,320 --> 00:15:59,980 I feel like I'm an elementary school student. 171 00:16:00,440 --> 00:16:02,220 Sorry, Melinda Terry, executive director 172 00:16:02,220 --> 00:16:05,740 of the California Center Valley Flag Control Association. 173 00:16:08,420 --> 00:16:10,820 And I'm going to try and come monthly 174 00:16:10,820 --> 00:16:14,180 and just on this agenda item, just share with you, 175 00:16:14,200 --> 00:16:16,420 maybe some of the things that we're discussing in our meetings 176 00:16:16,420 --> 00:16:22,820 to kind of give you a heads up about things that we're talking about, and so that maybe in the future agendas, 177 00:16:22,980 --> 00:16:25,000 you know, they can shut up. 178 00:16:25,040 --> 00:16:29,900 One, I just wanted to make you aware, not that anyone ever has shown up to our office from here, 179 00:16:30,260 --> 00:16:34,060 but we were located downtown, we just moved our office at the end of December. 180 00:16:34,560 --> 00:16:42,180 So we're now in West Sacramento at 3050 beacon boulevard, sweet 203. 181 00:16:43,060 --> 00:16:49,040 ZIP code is 9.5, 6.9.1, but so if you want to stop by, we are there now. 182 00:16:49,200 --> 00:16:53,760 We do have the same phone number, the same email, so none of that changed, but did 183 00:16:53,760 --> 00:16:56,020 want to make you aware of our location change. 184 00:16:57,740 --> 00:17:05,900 One of the issues is, I think, you're wearing your word commented on the ISM&D negative deck 185 00:17:05,900 --> 00:17:14,180 for the Delta Drilling that is proposed, and I've talked to your staff, but one of the things 186 00:17:14,180 --> 00:17:18,360 that we really noticed, we submitted a comment letter on the negative deck as well. 187 00:17:18,720 --> 00:17:23,240 But when you looked at the map, there's hundreds of sites that they are planning on doing 188 00:17:23,240 --> 00:17:28,680 exploratory drilling for both the tunnel, as well as, I guess, other projects they have in mind. 189 00:17:29,640 --> 00:17:33,300 When you looked at it, it looked like a lot of them were going to be on levies, but the 190 00:17:33,300 --> 00:17:41,680 Failed to talk about levees, drilling in levees, encroachments on project levees or anything like that. 191 00:17:42,480 --> 00:17:47,040 So I guess one of the things we would like to see is even before they're coming to you for a far away. 192 00:17:47,280 --> 00:17:53,340 It is maybe if you could ask DWR if they'd be willing to come make a presentation and talk about, you know, 193 00:17:53,440 --> 00:17:59,320 particularly the drilling that relates to either in, you know, the pathway, you know, adjacent to both. 194 00:17:59,320 --> 00:18:00,940 because they plan on doing on the water side, 195 00:18:00,940 --> 00:18:02,960 the land side through the levees. 196 00:18:03,680 --> 00:18:07,320 So it'd be helpful so that when you are in your for a process, 197 00:18:07,840 --> 00:18:10,720 we're able to discuss that with you from an LMA perspective. 198 00:18:12,000 --> 00:18:12,880 I see the light blinking. 199 00:18:13,280 --> 00:18:14,400 Delta's prevention funding. 200 00:18:15,620 --> 00:18:16,820 We are a little bit concerned about. 201 00:18:16,920 --> 00:18:19,820 I know you guys approved for next year, 202 00:18:20,220 --> 00:18:22,920 but it's hard to say, with bond money, 203 00:18:23,100 --> 00:18:24,660 we may have to go to general fund. 204 00:18:24,920 --> 00:18:26,920 And so I hope that your board will really, 205 00:18:26,920 --> 00:18:32,500 along with us, they on top of that and really work with the administration and the legislature to make sure. 206 00:18:33,020 --> 00:18:39,280 We do get that funding for what you approve this year, because it's not as certain, I would say, as it has been in past years. 207 00:18:40,360 --> 00:18:52,500 And then finally a topic that our Delta members are going to be reaching out to you and your staff is on lookout slew project and some issues that we have there, and I will leave it at that. 208 00:18:52,520 --> 00:18:53,080 Thank you. 209 00:18:53,080 --> 00:18:54,540 Thank you, Melinda. 210 00:18:55,400 --> 00:18:59,420 I think that's a good policy to have you come before the board. 211 00:18:59,460 --> 00:19:07,400 Yeah, we just thought, you know, we just kind of let, you know, a few items and give you heads up, like I said, an opportunity to, you know, think about agenda items for the future. 212 00:19:07,720 --> 00:19:13,240 Or just talk with us, you know, outside of the meeting on some of these topics. Thank you. 213 00:19:16,780 --> 00:19:19,300 Okay, anybody else on that item? 214 00:19:19,300 --> 00:19:25,980 Okay, that's the only written slip, is there anybody else that wants to speak on matters off the agenda? 215 00:19:28,360 --> 00:19:31,740 Okay, I'll bring that back to the board and then move to 216 00:19:33,080 --> 00:19:37,160 item number seven. This is 217 00:19:37,160 --> 00:19:41,600 the water resiliency portfolio and 218 00:19:42,640 --> 00:19:44,840 or no, I'm sorry. Yes. 219 00:19:44,840 --> 00:19:45,660 Thank you. 220 00:19:45,840 --> 00:19:46,340 Thank you. 221 00:19:50,630 --> 00:19:51,870 Is Nancy Bolgo here? 222 00:19:52,290 --> 00:19:52,910 She is. 223 00:19:53,450 --> 00:19:54,150 You're going to be introduced. 224 00:19:55,550 --> 00:19:56,330 Thank you. 225 00:19:57,210 --> 00:19:57,770 Thank you. 226 00:19:58,170 --> 00:19:58,690 Good morning. 227 00:19:58,830 --> 00:19:59,010 Good morning. 228 00:19:59,250 --> 00:20:00,810 Vice President Dole and members of the board. 229 00:20:01,250 --> 00:20:03,570 Darren Seen Policy Advisor for the Board. 230 00:20:04,850 --> 00:20:12,190 Back in April, you'll recall that the Governor's Executive Order, Natural Resources Agency, 231 00:20:12,590 --> 00:20:16,790 Kelly P.A. and California Department of Food and Agriculture to conduct listening sessions. 232 00:20:16,790 --> 00:20:23,690 that would culminate in a water results in resiliency portfolio, and this morning, as you mentioned earlier, 233 00:20:23,990 --> 00:20:31,350 we have Nancy Vogel, who is the director of the Governor's water portfolio program, here to talk about the portfolio this morning. 234 00:20:31,730 --> 00:20:36,230 We're very pleased to have her with us, and Nancy, Dr. Frother, do. 235 00:20:36,230 --> 00:20:36,710 Thank you. 236 00:20:36,710 --> 00:20:36,930 Thank you. 237 00:20:37,470 --> 00:20:37,850 Thank you. 238 00:20:38,370 --> 00:20:39,070 You have to. 239 00:20:39,290 --> 00:20:40,310 Is it just this one? 240 00:20:40,310 --> 00:20:40,490 Yeah. 241 00:20:41,850 --> 00:20:42,090 Good morning. 242 00:20:42,810 --> 00:20:43,970 Good morning, Chairman. 243 00:20:43,970 --> 00:20:49,830 And it's great to see so many trusted experts from earlier phases of my career here. 244 00:20:50,790 --> 00:20:53,930 And I congratulate you on the addition of Brian Johnson. 245 00:20:54,130 --> 00:20:57,710 He and I worked briefly together on the Clemth River Renew Corporation Board. 246 00:20:57,710 --> 00:21:01,110 I think you'll find him the kind of board member that goes above and beyond. 247 00:21:01,890 --> 00:21:08,230 And he understands the importance, the transformational importance of multi-benefit floodplain projects. 248 00:21:08,450 --> 00:21:09,630 And I think he'll be a great addition. 249 00:21:09,630 --> 00:21:14,510 So I will give a little background on the portfolio. 250 00:21:14,830 --> 00:21:25,270 I want to thank the board for being one of the bodies that held a public listening session for us and gathered up input from the public and provided your own input as well. 251 00:21:25,450 --> 00:21:29,490 And helped us in the iterative process of pulling together the suite of actions. 252 00:21:30,010 --> 00:21:35,630 We released a draft on January 3rd and we're asking for public comment until February 7th. 253 00:21:35,630 --> 00:21:39,790 So, as I tick through these slides, please bear in mind, this is a draft document. 254 00:21:40,070 --> 00:21:44,930 We want to improve it, refine it, so we want to hear from you and the public and stakeholders 255 00:21:44,930 --> 00:21:47,750 on how we can go about doing that. 256 00:21:48,170 --> 00:21:51,230 Excuse me, Ms. Vogel, would you please mind stating your name for the record? 257 00:21:51,510 --> 00:21:52,190 Oh, I'm sorry. 258 00:21:52,750 --> 00:21:54,010 My name is Nancy Vogel. 259 00:21:55,270 --> 00:21:56,110 Thank you. 260 00:21:56,570 --> 00:22:02,090 In September, your board offered several points for our consideration based on the public listening 261 00:22:02,090 --> 00:22:08,430 sessions and your own expertise and your guidance to us broadly was this, strengthen collaborative 262 00:22:08,430 --> 00:22:15,070 federal state, local tribal and public private partnerships, prioritize multi-benefit projects 263 00:22:15,070 --> 00:22:20,490 that utilize natural infrastructure, improve permitting and monitoring and mitigation and 264 00:22:20,490 --> 00:22:26,190 funding processes to facilitate implementation of both traditional and multi-benefit projects, 265 00:22:26,750 --> 00:22:31,110 integrate investments, policies and programs including the floodplain, the Sustainable 266 00:22:31,110 --> 00:22:36,230 ground water management act and potentially voluntary agreements to improve conditions for 267 00:22:36,230 --> 00:22:37,150 efficient wildlife. 268 00:22:37,730 --> 00:22:42,870 Encourage regional watershed approaches and identify sustainable funding for operations 269 00:22:42,870 --> 00:22:45,770 maintenance and repair of floodplain infrastructure. 270 00:22:46,710 --> 00:22:52,670 So I hope you'll see much of that reflected in the draft document and to some degree at least. 271 00:22:52,870 --> 00:22:56,610 And if you think we're missing something important or could do a better job of articulating 272 00:22:56,610 --> 00:22:59,050 something that's a priority for you, let us know. 273 00:22:59,230 --> 00:22:59,390 Please. 274 00:23:00,230 --> 00:23:10,710 So, some background, as Darren said in April, the governor issued about a 2.5 page executive order that was jam packed with to do's. 275 00:23:11,250 --> 00:23:27,450 And the natural resources agency, Cal EPA and the California Department of Food and Agriculture were asked to, together prepare a suite of actions that would prepare California's communities, environment and economy for the conditions of the future. 276 00:23:28,430 --> 00:23:34,450 Now, many factors, there are many factors, many good reasons to step back and take a look at 277 00:23:34,450 --> 00:23:41,850 California water policy right now, a couple of the most pressing are one we demographers 278 00:23:41,850 --> 00:23:47,730 tell us we can expect another 10 million Californians in the state by 2050 going from 40 million 279 00:23:47,730 --> 00:23:52,730 people to 50 million people. And as I'm sure you are all aware, the average warmer temperatures 280 00:23:52,730 --> 00:23:57,770 that we're seeing can wreak havoc with our precipitation patterns, we're seeing, you know, 281 00:23:57,790 --> 00:24:02,430 we are expecting, shrinking snowpack intensified drought and flood. 282 00:24:04,950 --> 00:24:12,810 So we think of this document as an integrated set of actions designed to help communities be ready 283 00:24:12,810 --> 00:24:17,830 for flood and drought on a scale and intensity that we haven't seen before. 284 00:24:17,830 --> 00:24:28,810 and to if not withstand those stressors to at least recover quickly from them and then to adapt and grow from these experiences. 285 00:24:30,710 --> 00:24:46,770 The governor asked us to as we were preparing the suite of actions to emphasize projects that would offer multiple benefits, and of course you're quite familiar with that concept of finding ways to both improve habitat. 286 00:24:46,770 --> 00:24:50,210 that retards groundwater, better protect communities, et cetera. 287 00:24:51,590 --> 00:24:58,370 It's hard to quantify, but we do get incredible benefits from natural infrastructure such as wetlands and forests and floodplains. 288 00:24:58,970 --> 00:25:00,910 He asks that we emphasize that. 289 00:25:01,190 --> 00:25:03,470 He wants regional approaches, and he wants partnerships. 290 00:25:04,210 --> 00:25:10,490 He asks us to innovate and pay mind to new technology where possible. 291 00:25:11,290 --> 00:25:15,130 And to work on a watershed and regional scale with these actions. 292 00:25:15,130 --> 00:25:21,690 We, after hearing a great deal of input from the public through the public listening sessions 293 00:25:21,690 --> 00:25:30,650 through more than 61-on-one meetings with stakeholders and incredibly comprehensive and substantial 294 00:25:30,650 --> 00:25:37,030 and impressive input from more than 100 different organizations and individuals, we came up 295 00:25:37,030 --> 00:25:44,650 with 133 draft actions and all of them fit under these four major rubrics, maintain and diversify 296 00:25:44,650 --> 00:25:50,210 water supplies, protecting enhanced natural systems, build connections, whether that's human, 297 00:25:50,590 --> 00:25:55,150 physical, digital, data oriented, et cetera, and be prepared. 298 00:25:58,170 --> 00:26:05,770 So some of the themes that you'll see in the portfolio proposed actions, there are quite 299 00:26:05,770 --> 00:26:11,770 a few options that direct the administration simply to implement laws that were enacted 300 00:26:11,770 --> 00:26:13,210 than in recent years. 301 00:26:13,650 --> 00:26:16,710 Through the 2012-2016 drought complex, 302 00:26:16,810 --> 00:26:20,290 but incredibly important legislation was enacted, 303 00:26:20,610 --> 00:26:21,830 including SIGMA, 304 00:26:23,870 --> 00:26:26,490 SB 606 and AB 1668, 305 00:26:27,610 --> 00:26:31,030 which will essentially give us a new framework 306 00:26:31,030 --> 00:26:34,450 for what are use of efficiency in our cities, 307 00:26:34,630 --> 00:26:35,610 and on our forms. 308 00:26:36,270 --> 00:26:38,130 And then in July 2019, 309 00:26:38,370 --> 00:26:40,010 the Governor enacted the Safe and Affordable 310 00:26:40,010 --> 00:26:47,890 drinking water act to try to deal with the problem of more than one million California 311 00:26:47,890 --> 00:26:54,110 to lack access to safe drinking water. And then not all the efforts that are ongoing 312 00:26:54,110 --> 00:26:59,350 that we highlight in the portfolio were legislative. We are also working, obviously, 313 00:26:59,470 --> 00:27:04,710 and it's important to do so to eradicate the nutrient. The rodents introduced from South America 314 00:27:04,710 --> 00:27:08,470 have that can cause lots of levy problems as you all know. 315 00:27:09,610 --> 00:27:15,130 Some of the actions in the portfolio, many of them actually called for much greater state 316 00:27:15,130 --> 00:27:17,390 coordination among agencies. 317 00:27:17,630 --> 00:27:22,610 This governor does not want to see folks working in silos when that's counterproductive. 318 00:27:23,670 --> 00:27:30,010 We have proposed actions to coordinate grant and loan programs and permitting to try to integrate 319 00:27:30,010 --> 00:27:37,370 our models and to be essentially a help and not a hindrance when local and regional entities come to us 320 00:27:37,370 --> 00:27:42,710 with complex multiple partner, multiple benefit projects that they want to carry out. 321 00:27:44,490 --> 00:27:49,290 Some of the actions highlight the role of science and the need for better data, we learned a lot 322 00:27:49,290 --> 00:27:55,510 in the 2012 to 2016 drought that we could use a lot better real-time information about who's 323 00:27:55,510 --> 00:27:59,130 using water, where, and how, so some of the actions 324 00:27:59,130 --> 00:28:02,870 are related to that, we heard from stakeholders 325 00:28:04,030 --> 00:28:07,290 that watershed scale, climate, vulnerability, 326 00:28:07,690 --> 00:28:10,790 and adaptation analyses that use the best science 327 00:28:10,790 --> 00:28:13,350 and that are conducted by the state in a consistent way 328 00:28:13,350 --> 00:28:16,010 would be incredibly valuable for their planning efforts. 329 00:28:16,250 --> 00:28:17,930 And so that's one of our proposed actions. 330 00:28:19,890 --> 00:28:24,030 So the themes, I think, some of the broad themes 331 00:28:24,030 --> 00:28:30,510 the portfolio taken together are that water management in California is by and large a local 332 00:28:30,510 --> 00:28:35,650 effort, local and regional, the public policy institute of California tells us that of the 333 00:28:35,650 --> 00:28:42,610 estimated $33 billion a year that are spent on water management in California 85% of that 334 00:28:42,610 --> 00:28:48,230 is raised and spent at the local level. But the state does have an important role as a policy maker, 335 00:28:48,230 --> 00:28:55,290 regulator, a funder, a collector, and a disseminator of information, an incentivizer, et cetera. 336 00:28:56,730 --> 00:29:03,850 There was great progress made in the 2012 to 2016 drought with legislation that if fully implemented 337 00:29:03,850 --> 00:29:08,070 will go a long way towards helping to build regional water resilience, and we should not 338 00:29:08,070 --> 00:29:14,170 squander that momentum. And again, state agencies need to do a better job of integrating their efforts 339 00:29:14,170 --> 00:29:17,450 to support local water resilience efforts. 340 00:29:21,130 --> 00:29:23,050 All right, so I've given your interest. 341 00:29:23,570 --> 00:29:25,890 I pulled out here the actions that are in the draft 342 00:29:25,890 --> 00:29:27,490 portfolio related to flood. 343 00:29:27,670 --> 00:29:29,850 And there are quite a few actually relative 344 00:29:30,390 --> 00:29:32,670 to other aspects of water management. 345 00:29:32,910 --> 00:29:34,570 In fact, I think there's more proposed actions 346 00:29:34,570 --> 00:29:36,050 in this document related to flood 347 00:29:36,050 --> 00:29:37,310 than anything except groundwater. 348 00:29:41,290 --> 00:29:45,110 So we agreed that we've got to find more efficient ways 349 00:29:45,110 --> 00:29:50,390 to permit the operation and maintenance of flooding for structure, and his board member Tim Ramirez 350 00:29:50,390 --> 00:29:55,950 is so articulately expressed as we've got to pay attention to the San Joaquin where the peak 351 00:29:55,950 --> 00:29:59,970 flows are scary when you look at what's projected into the... 352 00:30:00,000 --> 00:30:10,180 Future. So here are some of the proposed actions. And here are more. It's worth noting that the governor's proposed budget, 353 00:30:10,360 --> 00:30:20,220 which was released earlier. This month includes a proposed $4.75 billion climate resilience bond that would go before voters in November 2020. 354 00:30:20,420 --> 00:30:29,020 Of course, that needs to be negotiated with the legislature. But that bond proposed would include $340 million for the state match on various 355 00:30:29,020 --> 00:30:35,120 US Army Corps of Engineer projects through 2024-25, and another $270 million dollars from 356 00:30:35,120 --> 00:30:36,640 all type benefit flood projects. 357 00:30:37,720 --> 00:30:44,900 In addition, the proposed budget includes $54.6 million in Prop 68 funding to enhance 358 00:30:44,900 --> 00:30:49,760 the state's flood control and prevention system through the floodplain management, Yolo Bipass, 359 00:30:49,980 --> 00:30:54,300 multi-benefit, and floodwater groundwater, or floodwater groundwater recharge programs. 360 00:30:55,820 --> 00:31:11,280 So, as you can see, the draft portfolio calls for a lot of interagency work to find ways to make permitting a flood projects and operations and maintenance easier to get and to get some synergy with environmental benefits as well. 361 00:31:11,540 --> 00:31:19,920 And the draft portfolio would commit the state to try to pursue federal funds for flood risk reduction before and after any disaster. 362 00:31:20,500 --> 00:31:22,140 So where do we go from here? 363 00:31:22,380 --> 00:31:27,200 Hopefully you'll take the time to review the draft documents and get us written feedback. 364 00:31:27,680 --> 00:31:29,260 I really appreciate written feedback. 365 00:31:29,700 --> 00:31:32,720 There's not enough time in the day to collect it all face-to-face. 366 00:31:33,440 --> 00:31:36,040 And we'll revise the document as quickly as we can. 367 00:31:36,560 --> 00:31:38,120 And get a final version to the governor. 368 00:31:38,340 --> 00:31:41,060 I can't give you an exact date as to when that would happen. 369 00:31:42,120 --> 00:31:43,520 But ideally we'll not take months. 370 00:31:44,420 --> 00:31:47,520 And I appreciate the opportunity to give you this quick overview. 371 00:31:47,520 --> 00:31:49,980 And I'm happy to try to answer any questions. 372 00:31:51,300 --> 00:31:51,980 Thank you. 373 00:31:52,220 --> 00:31:52,600 Nancy. 374 00:31:53,240 --> 00:31:55,780 I really appreciate that. 375 00:31:56,720 --> 00:32:09,180 We had a meeting or started discussion on the on the resiliency of Portfolio at the coordinating committee on Wednesday. 376 00:32:09,180 --> 00:32:17,080 the gene and Clyde kind of coordinated that for the stakeholders that and we've gotten 377 00:32:17,080 --> 00:32:20,380 some feedback and probably we'll have some feedback today. 378 00:32:21,260 --> 00:32:29,440 But I think I just like to share a couple of thoughts and then maybe gene and Clyde can jump 379 00:32:29,440 --> 00:32:36,060 in and then we have a number of speakers that we can have also come in. 380 00:32:36,060 --> 00:32:42,800 I think the bottom line is, is we think this is a great vehicle. 381 00:32:43,360 --> 00:32:50,320 This will be our really our key tool for integrating all the silos that are operating 382 00:32:50,320 --> 00:32:50,840 now. 383 00:32:50,880 --> 00:32:52,900 And that's the key here. 384 00:32:53,700 --> 00:33:01,400 We hear that from all the stakeholders that the state is actually coming at them with 385 00:33:01,400 --> 00:33:11,020 a whole bunch of restrictions, regulations, and so on that they feel and some areas are competing 386 00:33:11,820 --> 00:33:13,100 and are conflicting. 387 00:33:13,980 --> 00:33:19,900 And it's going to take something like this resiliency portfolio to pull that together. 388 00:33:20,760 --> 00:33:25,240 And we have a little bit of experience with that in the Yolo bypass, which I think we can 389 00:33:25,240 --> 00:33:38,600 look at, in order to get that group of suite of projects underway, he had to have a little 390 00:33:38,600 --> 00:33:46,700 team that he put together and it took an awful lot of work, meetings all the time to 391 00:33:46,700 --> 00:33:52,980 try to get those projects underway and some of them, you know, we still aren't started 392 00:33:52,980 --> 00:33:58,320 yet, but many of them are started and many of them, a couple of them they have been completed. 393 00:33:59,300 --> 00:34:02,360 So it's a success, but it takes a lot of work. 394 00:34:02,980 --> 00:34:09,860 There needs to be a team of people, there needs to be technical work groups that report back. 395 00:34:10,140 --> 00:34:16,600 There just everybody is, has got to get the message and at least that's what I'm thinking. 396 00:34:16,600 --> 00:34:36,020 I think in the way of background, I think, we can all agree that we're really at a really critical point in our state's history where both from a regulatory policy standpoint and also from a program implementation standpoint. 397 00:34:36,020 --> 00:34:38,540 So we've got to start getting some things done. 398 00:34:40,140 --> 00:34:46,020 We have a, you know, just looking at it from a stakeholder standpoint or a landowner's 399 00:34:46,020 --> 00:34:46,240 standpoint. 400 00:34:46,720 --> 00:34:53,240 We do have a very stringent regulatory environment, which all the landowners, all the local 401 00:34:53,240 --> 00:34:54,840 governments are facing. 402 00:34:55,600 --> 00:35:03,840 And I think the stakes have never been higher to try to have this water resiliency portfolio 403 00:35:03,840 --> 00:35:10,900 So actually pull all of these programs, these siloed programs, these siloed projects together 404 00:35:11,480 --> 00:35:14,980 and develop priorities. 405 00:35:15,640 --> 00:35:19,880 Now I think your portfolio, in my view, presents a vision. 406 00:35:20,700 --> 00:35:27,740 It's really a vision for how we integrate programs and establish priorities for funding 407 00:35:27,740 --> 00:35:39,180 In our case, $30 billion over 30 years and, you know, you had in water and all of these other things that are going on and it's a big, big number. 408 00:35:40,000 --> 00:35:47,140 And it's bigger than what is being considered as a bond issue for everything. 409 00:35:47,140 --> 00:35:53,600 The bond issue includes streets and there are, I mean, highways and all the 410 00:35:53,600 --> 00:36:00,600 Cal Transmoney and bridges and in addition to flood and flood itself as huge. 411 00:36:01,180 --> 00:36:04,320 And I imagine these others are even even bigger. 412 00:36:05,560 --> 00:36:11,460 But I'm just hoping that this tool can all mentally be the tool that brings our programs 413 00:36:11,460 --> 00:36:12,020 together. 414 00:36:12,020 --> 00:36:22,300 But I just based on our experience and you talked to Chris, I'm sure about what he's faced with just in the Yolo. 415 00:36:22,700 --> 00:36:31,300 I was going to take a lot of work and it's going to take a lot of people working hard to bring this together. 416 00:36:33,240 --> 00:36:42,140 I guess, frankly, when I read the document, I didn't see much in there on flood, to be honest, 417 00:36:42,900 --> 00:36:54,740 maybe I'm not, I'll read it again, and so on, but we all know, I think, that flood has always been kind of an afterthought, 418 00:36:54,740 --> 00:37:11,940 You know, as we're thinking about it, most people DWR and in the policy arena are thinking of water supply, water, dams, that's kind of the main focus and oh, yeah, by the way, we have flood, but it's always kind of been an afterthought. 419 00:37:12,360 --> 00:37:24,720 I believe, and maybe that's overstated, but I think, but I was hoping for a little more on the flood area in the portfolio. 420 00:37:24,720 --> 00:37:31,920 you. Well, please tell us exactly what you would add. Yeah, okay. Well, well, since you asked. 421 00:37:32,660 --> 00:37:42,720 Well, I don't mean it this moment. No, but just a couple of things. And I thank you for your invitation. 422 00:37:44,100 --> 00:37:50,300 I will probably be sorry for this invitation to give you comments and so on and it is a draft. 423 00:37:50,300 --> 00:37:56,040 But I think it is going to be dynamic document because as we go along it's going to have 424 00:37:56,040 --> 00:38:00,160 to change and so on and that's good, I think it's good. 425 00:38:01,820 --> 00:38:11,780 Well, we need to say somewhere that without the levees and channels there is no water 426 00:38:11,780 --> 00:38:20,380 advance. And the Central Valley flood protection plan, I think, is in order to both flood 427 00:38:20,380 --> 00:38:30,200 and water supply resiliency. And I should, I think it needs to be viewed more as complementary 428 00:38:30,200 --> 00:38:37,100 to water supply, and not as competitors, which it has been in the past. I think it has 429 00:38:37,100 --> 00:38:44,880 that there needs to be a greater emphasis on reducing or investing in reducing flood risk. 430 00:38:45,400 --> 00:38:51,320 And the maintenance and operations of our flood system, we have to take care of what we have. 431 00:38:51,960 --> 00:38:53,980 And the be honest, we haven't. 432 00:38:54,500 --> 00:39:02,860 If you look at the inspection reports on the levies, which we get annually, it shows the same 433 00:39:02,860 --> 00:39:09,320 folks at local maintaining agencies have not been maintaining their lobbies the way they should. 434 00:39:10,000 --> 00:39:11,680 So what have we done about it? 435 00:39:12,160 --> 00:39:20,460 Well, not much for trying, we're increasing our programs out there, here again, it's 436 00:39:20,460 --> 00:39:26,060 putting more pressure on the local governments who don't have a lot of money out there. 437 00:39:26,060 --> 00:39:34,260 We're depending upon our BCP that Leslie's going to have been not that one, but the BCP 438 00:39:34,260 --> 00:39:42,940 was already been approved to look into funding through the SSJD for kind of, we view that 439 00:39:42,940 --> 00:39:49,240 is it might be the glue that puts all these programs and projects together that the locals can't 440 00:39:49,240 --> 00:39:53,920 these rural districts, these rural areas where these 441 00:39:53,920 --> 00:39:58,100 levees are important to property and people safety. 442 00:39:58,340 --> 00:40:03,600 Public safety, these rural areas simply can't afford what 443 00:40:03,600 --> 00:40:08,600 we're asking in our area, in our area of flood protection, 444 00:40:09,840 --> 00:40:13,840 certain criteria that the core requires for operation 445 00:40:13,840 --> 00:40:14,600 maintenance. 446 00:40:14,600 --> 00:40:25,620 We spent a year on the year on the year on 447 00:40:32,720 --> 00:40:45,680 the issue of what is the criteria and we went back and forth with the Delta Stewardship Council and trying to define what we really mean. 448 00:40:45,680 --> 00:40:53,420 And I think we now have what the core means and what it's accepted, what's the correct 449 00:40:53,420 --> 00:40:56,120 area for the main, that's an operation, these levies. 450 00:40:56,920 --> 00:41:02,340 And I think there needs to be something in there about that. 451 00:41:02,340 --> 00:41:07,640 I also think there needs to be, you know, and some people are going to go crazy about this, 452 00:41:07,920 --> 00:41:13,920 but it seems to me we need the least recognized that there's going to be some continued 453 00:41:13,920 --> 00:41:22,560 investment in the Delta in the maintenance area because it's going to take 10 years to get a 454 00:41:22,560 --> 00:41:35,600 new paradigm and a you know beneficial water system there so it's going to take a decade before the 455 00:41:35,600 --> 00:41:41,240 new conveyance system is operational and I think that's you know what are we doing the mean time 456 00:41:41,240 --> 00:41:44,980 So there's going to have to be some work we need to do there. 457 00:41:47,820 --> 00:41:56,900 Obviously, the portfolio recognizes the importance of multi-benefit initiatives. 458 00:41:59,380 --> 00:42:01,180 But I think 459 00:42:05,380 --> 00:42:13,420 we can't really protect as the flood plan says through everything. 460 00:42:13,420 --> 00:42:18,600 It has to be a suite of things that we're doing, multi-benefit projects, flood maintenance 461 00:42:18,600 --> 00:42:24,400 projects, water supply projects, they all have to, they are going to have to do different 462 00:42:24,400 --> 00:42:24,820 things. 463 00:42:25,040 --> 00:42:32,240 That's what multi-benefit means, and I think flood protection is a key to some of these 464 00:42:32,240 --> 00:42:36,000 rural areas, especially where they can't afford it. 465 00:42:36,060 --> 00:42:38,560 I think the state's going to have to help out with those. 466 00:42:38,560 --> 00:42:41,280 Anyway, those are 467 00:42:43,450 --> 00:42:52,890 the one thing that we're faced with now, and I know the governor's interest in homelessness. 468 00:42:54,650 --> 00:43:00,010 There needs to be something in the portfolio. We have a lot of state surplus property. 469 00:43:00,210 --> 00:43:05,490 We have a lot of it. We're going to have to deal with public safety issue. 470 00:43:05,490 --> 00:43:13,390 But we're going to have to recognize that we're also going to have to deal with that problem and, frankly, we're just in the middle of dealing with that. 471 00:43:13,750 --> 00:43:30,210 So I'm not sure how the portfolio is going to reconcile what he wants in his executive order versus this water resiliency portfolio, whether it's going to be totally to separate things or not, but as you know we've been asked to kind of look at that. 472 00:43:30,210 --> 00:43:41,190 I was looking for, I guess, more specificity in the portfolio, more timelines, more specific outcomes, 473 00:43:42,170 --> 00:43:48,130 so that the people, so that our stakeholders would get a sense of where the state's going. 474 00:43:49,290 --> 00:43:55,270 What I feedback on getting from them is that they're getting all of these requirements. 475 00:43:55,270 --> 00:44:05,190 We're requiring more maintenance and operational attention on the levees taking care of what we have. 476 00:44:05,630 --> 00:44:15,410 Other people are requiring that other things that they're doing which are important restoring ecosystems and so on, 477 00:44:16,010 --> 00:44:22,970 but they're not getting a sense of what the state overall direction is. 478 00:44:22,970 --> 00:44:34,550 And I think that's what your portfolio is going to ultimately do, and we want to work very closely with you on that. 479 00:44:39,340 --> 00:44:55,380 Anyway, those are just some comments that for what it's worth, I think the only thing that's going to bring these together is what you're trying to do, but I really think it's going to be a lot of work, a lot of people and a lot of teams. 480 00:44:55,380 --> 00:44:59,940 So, those are just some comments that I... 481 00:45:00,460 --> 00:45:05,740 May appreciate any other questions for Nancy from the board. 482 00:45:07,480 --> 00:45:08,600 Go ahead. 483 00:45:08,640 --> 00:45:09,080 Go ahead. 484 00:45:09,080 --> 00:45:09,340 Go ahead. 485 00:45:09,940 --> 00:45:10,400 Go ahead. 486 00:45:12,320 --> 00:45:14,360 I'll be brief on this. 487 00:45:14,820 --> 00:45:18,380 As you know, I spent my career working on water policy, mostly in the legislature. 488 00:45:20,280 --> 00:45:27,440 I think one of the things that, as I kind of look back on that period for me, it was really difficult to get anything done. 489 00:45:28,360 --> 00:45:32,820 There were lots of projects proposed, but a lot of things just could not get done. 490 00:45:33,640 --> 00:45:39,460 And I really like what this, what the project that you're working on Nancy is doing and 491 00:45:39,460 --> 00:45:47,540 what it's proposing, and I think it's a very much of a shift in a direction that is really 492 00:45:47,540 --> 00:45:47,940 good. 493 00:45:47,940 --> 00:45:49,260 It's more holistic. 494 00:45:49,780 --> 00:45:51,820 It's more participatory. 495 00:45:53,120 --> 00:46:01,460 It's moving us in a better direction where we are better connected at the state level, at the local level, at the federal level. 496 00:46:02,540 --> 00:46:06,040 And I think it has lots and lots of opportunities there. 497 00:46:07,700 --> 00:46:12,420 And I hope this is successful, but I really like the direction you're going. 498 00:46:12,980 --> 00:46:16,980 I just like to make another comment on things like funding. 499 00:46:16,980 --> 00:46:19,520 We have to pay attention to the funding issue. 500 00:46:19,620 --> 00:46:27,560 I mean, we've talked in this board about wanting to do uplift of habitat values, fishery 501 00:46:27,560 --> 00:46:31,640 values, birds, things like that, but there's not funding for it. 502 00:46:32,480 --> 00:46:38,960 And if we're going to do, a lot of work gets done as mitigation, but mitigation is just mitigation. 503 00:46:39,240 --> 00:46:44,860 And we really don't have an uplift component, and we need things like that. 504 00:46:44,860 --> 00:46:54,720 We need to have, and also if we're going to build multi-benefit projects, we under 505 00:46:54,720 --> 00:47:02,080 prop to 18, districts can't go to their voters and say, hey, we want to fund birds and 506 00:47:02,080 --> 00:47:07,740 things like that, and so we need a mechanism that we, that's somehow we fund those things. 507 00:47:08,060 --> 00:47:11,720 And so I think we need to pay attention to fun, and I'm not saying you're not, but it's kind 508 00:47:11,720 --> 00:47:16,820 of the things that I see is it's really important on what we've been trying to do and also 509 00:47:16,820 --> 00:47:21,100 what your document is trying to do. So I thank you for what you're doing. Thank you, Clay. 510 00:47:25,080 --> 00:47:33,740 Hi, Nancy. We go back a little ways that I remember being interviewed by you as 511 00:47:33,740 --> 00:47:39,480 when you were a reporter. And I remember your story is about 86 and it's awesome. 512 00:47:46,080 --> 00:48:02,280 I agree with what Bill and Clyde have to say, so I'm going to get off the boat a little bit here and go into the area of actual water supply and delivery, which not necessarily, you know, directly related to flood control. 513 00:48:02,280 --> 00:48:08,760 I think the emphasis on improved efficiency 514 00:48:10,120 --> 00:48:12,900 has the greatest potential. 515 00:48:13,760 --> 00:48:16,780 In California, we have what I call a dam dream. 516 00:48:17,820 --> 00:48:21,920 Everybody feels, oh, I spilled a dam, all the problems go away. 517 00:48:23,320 --> 00:48:29,260 And if you actually look at the water supply runoff, 518 00:48:29,860 --> 00:48:31,620 you just can't get there from here. 519 00:48:31,620 --> 00:48:34,280 You can't get there from here. 520 00:48:35,100 --> 00:48:45,660 And the dams that we have provide something like three to five year water supply, something in that order. 521 00:48:47,220 --> 00:48:52,260 And we know from tree rings that we could easily have seven to ten year. 522 00:48:53,760 --> 00:48:59,380 So you can build all the surface storage you want, and if you have a seven to ten year drought, 523 00:48:59,380 --> 00:49:05,100 You're going to run out of water if that's your main emphasis on solving this problem. 524 00:49:06,380 --> 00:49:11,980 So really, we can't, we've got a really emphasized, improved efficiency. 525 00:49:13,200 --> 00:49:15,180 I don't see the other way out for California. 526 00:49:16,180 --> 00:49:23,920 I mean, we could have a huge dislocation of the population if we had experienced the 527 00:49:23,920 --> 00:49:30,840 to 10-year drought. And it would be beyond anything that's been experienced previously, an enormous 528 00:49:30,840 --> 00:49:40,560 disaster. So I encourage what you're doing the way you're thinking about this. And we all have 529 00:49:40,560 --> 00:49:50,580 to pull together because I think this in flood and this drought are the two biggest emergencies or 530 00:49:50,580 --> 00:49:54,020 We, you know, threats to our way of life in California. 531 00:49:54,660 --> 00:49:57,220 So I'm glad that we're taking some action here. 532 00:49:58,680 --> 00:50:00,560 Yeah, the only thing that I would add, 533 00:50:01,020 --> 00:50:03,540 I remember I emphasized that Nancy, 534 00:50:03,560 --> 00:50:05,280 you're gonna have to have a team of people 535 00:50:05,280 --> 00:50:09,300 that helps get this done and not just two or three. 536 00:50:09,740 --> 00:50:12,620 It's got to be a full effort out there. 537 00:50:13,060 --> 00:50:17,060 But the bottom line is we have got to bring the locals 538 00:50:17,060 --> 00:50:26,740 along with the priorities and the timelines and what they're perceiving as the restrictions 539 00:50:27,620 --> 00:50:29,680 and the edicts by the state. 540 00:50:30,080 --> 00:50:34,700 We've got to be with us on this or it's going nowhere. 541 00:50:35,080 --> 00:50:40,240 That's what we've learned or it's going to court and we don't want that either. 542 00:50:41,040 --> 00:50:43,020 But that's what we learned in the flood plan. 543 00:50:43,020 --> 00:50:52,260 we've got to start with them and hear them and understand them and work to get this resiliency 544 00:50:52,260 --> 00:51:00,120 portfolio to a point where we all are on the same page and that's that's really a key 545 00:51:00,120 --> 00:51:07,520 to do. I think they're wanting to do that. So maybe the outreach we can help with the outreach 546 00:51:07,520 --> 00:51:15,440 it automatically meetings or whatever you want were available for that, because it did work 547 00:51:17,560 --> 00:51:23,120 with the flood plan anyway. Tim or Maris? 548 00:51:28,200 --> 00:51:29,920 Yeah, thank you. 549 00:51:30,280 --> 00:51:31,060 Oh, you got it. 550 00:51:31,560 --> 00:51:35,700 That's okay. There's an order here and it's sort of mixed down a little bit. First, thank 551 00:51:35,700 --> 00:51:39,760 you for coming today and for doing this. I want to echo up Clyde said, 552 00:51:39,760 --> 00:51:49,240 I watched the last several plans from a governor get developed and this is, I think, by far, the most comprehensive thorough and open to participation. 553 00:51:50,660 --> 00:51:58,320 The process by itself is a challenge and to put it all in one place, I'm sure, as you know, is a big accomplishment and just to have a draft. 554 00:51:58,980 --> 00:52:03,620 So, thank you for doing that. It's really nice to have a place to focus our comments and we'll do that. 555 00:52:04,600 --> 00:52:12,160 And I want also, like what Bill said about whatever we can do to help, I'm sure we would do that, so please lean on us and whatever way you think we can be useful. 556 00:52:13,520 --> 00:52:16,840 Just two quick comments as well about the details. 557 00:52:18,420 --> 00:52:24,800 I think the story you gave at the beginning looks just like our Central Valley Floor Protection Plan, the DWR help prepare. 558 00:52:25,200 --> 00:52:31,860 All of those themes, regional and integrated in multi-benefit, which is great because it's very totally in sync, which is going to be, 559 00:52:31,860 --> 00:52:35,860 I think it really important because, right after this gets done, we're going to launch into our five 560 00:52:35,860 --> 00:52:39,520 replicators, you know, so I think it's going to dovetail really well. It's going to be a great opportunity. 561 00:52:40,580 --> 00:52:46,040 And I love that the SoundMaking part is in build connections because I can't think of a better way to 562 00:52:46,040 --> 00:52:51,780 describe that story. All the things that are in the document, you could put under build connections 563 00:52:51,780 --> 00:52:55,720 in the SoundMaking, you know, quality water for people to drink, 564 00:52:58,560 --> 00:53:02,880 precreation, fish, protecting communities that are behind levees, and there's good stories 565 00:53:02,880 --> 00:53:08,140 in pieces in the valley, but I think what we're really lacking is the stage role to knit 566 00:53:08,140 --> 00:53:14,340 that together. And the board, I think, has a really great opportunity to do that because the footprint 567 00:53:14,340 --> 00:53:18,440 of our responsibilities, structures throughout the land and higher system, all the way from 568 00:53:18,440 --> 00:53:21,880 Brian down, and GDPR was just here with the Bureau of Aspons, 569 00:53:21,880 --> 00:53:24,640 as you probably know talking about the San Joaquin Restoration Program. 570 00:53:25,860 --> 00:53:27,560 So that's where I'm going to try to focus our comments. 571 00:53:27,780 --> 00:53:31,540 Just to try to think about how we can really try to help connect those dots. 572 00:53:31,980 --> 00:53:36,320 And then maybe through the plan and through the words of the 30 help bring 573 00:53:36,320 --> 00:53:37,260 life to those things. 574 00:53:37,480 --> 00:53:41,000 I think it's been a long time coming and hopefully we can help 575 00:53:41,000 --> 00:53:42,020 provide some of that insight. 576 00:53:42,820 --> 00:53:43,740 So I appreciate that. 577 00:53:43,740 --> 00:53:44,300 Thank you. 578 00:53:45,060 --> 00:53:45,160 Thank you. 579 00:53:45,460 --> 00:53:46,860 Yeah, that's a good point. 580 00:53:48,780 --> 00:53:55,900 We are successful, we have been successful with putting a plan together that's been accepted 581 00:53:56,920 --> 00:54:04,920 by our local stakeholders and all the players and we need to build on that. 582 00:54:05,320 --> 00:54:11,180 We don't need to start over, we need to build on something that's successful and move that 583 00:54:11,180 --> 00:54:15,420 forward and that needs to be part of our thinking too. 584 00:54:15,420 --> 00:54:18,840 We have some people in the audience that'd like to... 585 00:54:18,840 --> 00:54:19,920 You also have a group. 586 00:54:22,100 --> 00:54:23,700 You can do that. 587 00:54:24,000 --> 00:54:24,260 I'm sorry. 588 00:54:26,460 --> 00:54:26,960 I know. 589 00:54:28,180 --> 00:54:30,920 I think that the draft is excellent. 590 00:54:32,060 --> 00:54:38,480 And that it came together in government timelines so quickly and comprehensively. 591 00:54:39,020 --> 00:54:40,520 Not as quickly as I'd have liked. 592 00:54:40,520 --> 00:54:41,480 Thank you. 593 00:54:41,780 --> 00:54:47,980 So how the team took what I thought was probably was extensive input into something that's 594 00:54:47,980 --> 00:54:50,360 so cogent, like, graduations to that. 595 00:54:50,780 --> 00:54:54,800 I think that our job, and I think you've heard this here, so I'm going to associate myself 596 00:54:54,800 --> 00:54:59,600 with my board members, what they said is clear what we all tried to work on. 597 00:54:59,960 --> 00:55:01,400 The needs are pretty well known. 598 00:55:01,500 --> 00:55:05,840 We've talked about them for a long time, even way back in my days is county supervisor. 599 00:55:06,020 --> 00:55:07,000 We've talked about that. 600 00:55:07,000 --> 00:55:14,400 We have systems, all kinds of systems built for a population that is much less than what we 601 00:55:14,400 --> 00:55:16,760 have right now, let alone what is coming forward. 602 00:55:17,240 --> 00:55:22,360 And our work in creating first, the first, the first, the center of the Lifeblood Protection 603 00:55:22,360 --> 00:55:31,260 Plan and the update in 2017, clearly identifies that multi-benefit is what the plan and 604 00:55:31,260 --> 00:55:32,820 our systems have fled due. 605 00:55:32,820 --> 00:55:35,560 we just don't understand that or take advantage of it 606 00:55:35,560 --> 00:55:37,120 or know how to make that better. 607 00:55:37,680 --> 00:55:40,200 So I identified many ways in the plan to work forward. 608 00:55:40,900 --> 00:55:42,640 And I don't think it's you. 609 00:55:42,740 --> 00:55:43,820 I think it's a we. 610 00:55:44,280 --> 00:55:47,700 And I really believe that the blood board and its staff 611 00:55:47,700 --> 00:55:51,440 are ready to actively work on collaboration, 612 00:55:51,700 --> 00:55:52,840 not to say we support it. 613 00:55:52,840 --> 00:55:55,240 Because it takes effort and it takes time. 614 00:55:55,480 --> 00:55:58,040 It takes initiative, not to say, oh yeah, I'm on board, 615 00:55:58,200 --> 00:55:59,300 but to be present. 616 00:55:59,720 --> 00:56:01,820 And so we're there to do that. 617 00:56:01,820 --> 00:56:07,440 And it just inputs we get from our stakeholders and we have lots of stakeholder meetings because 618 00:56:07,440 --> 00:56:13,500 we think that's important to get folks knowledgeable and on board is how to look at 619 00:56:13,500 --> 00:56:18,920 recrafting all the systems we have and we're fled, but there's contains and all the others 620 00:56:20,880 --> 00:56:28,320 to build ways that they can be recrafted to meet future needs because future is upon us. 621 00:56:28,320 --> 00:56:33,120 And we talk about things like, oh, I'll use excess flood waters to recharge ground water. 622 00:56:33,620 --> 00:56:39,560 Well, that's an excellent concept, very difficult to achieve, and we'll be at the table to help 623 00:56:39,560 --> 00:56:40,580 help work that out. 624 00:56:40,880 --> 00:56:42,040 So thank you for being here today. 625 00:56:42,060 --> 00:56:42,720 Thank you. 626 00:56:42,840 --> 00:56:43,760 Thank you very much. 627 00:56:44,380 --> 00:56:45,520 Any other board members? 628 00:56:47,360 --> 00:56:47,660 Okay. 629 00:56:49,160 --> 00:56:49,900 Thank you, Nancy. 630 00:56:51,580 --> 00:56:51,640 Thank you. 631 00:56:51,640 --> 00:56:51,740 Okay. 632 00:56:51,840 --> 00:56:53,660 We have a work where I know it. 633 00:57:03,830 --> 00:57:04,850 Thank you, President Eger. 634 00:57:05,130 --> 00:57:07,230 Members of the Board, Executive Officer Gallagher. 635 00:57:07,230 --> 00:57:10,010 Rick Reinhardt, I'm here on behalf of the Central Valley 636 00:57:10,010 --> 00:57:11,510 Flood Control Association today. 637 00:57:12,710 --> 00:57:14,870 We greatly appreciate the New Smith Administration's 638 00:57:14,870 --> 00:57:18,790 leadership and Nancy in particular for leading authoring 639 00:57:18,790 --> 00:57:19,970 this document. 640 00:57:21,010 --> 00:57:25,350 It lays out a plan for how we do what we're doing on the 641 00:57:25,350 --> 00:57:27,910 Central Valley protection plan in the Central Valley 642 00:57:27,910 --> 00:57:31,070 really to statewide scale and emphasizing the importance 643 00:57:31,070 --> 00:57:34,410 of how these programs that so far have been implemented 644 00:57:34,410 --> 00:57:43,310 silos can be more effective if done as in an integrated fashion. I want to touch on a 645 00:57:43,310 --> 00:57:47,210 a couple of things that the board members have said and was really pleased to hear that 646 00:57:47,210 --> 00:57:53,430 and building on our discussion at the coordinating committee meeting on Wednesday. We were 647 00:57:53,430 --> 00:57:57,810 pleasantly surprised to see there are quite a few things and flood management listed in the 648 00:57:57,810 --> 00:58:02,210 water resiliency portfolio. But there's a few areas that we want to see highlighted. 649 00:58:02,210 --> 00:58:12,730 I'm not going to go into detail today, but we are going to provide some comments and some suggestions for some very small edits that we think will make a meaningful impact in emphasizing flood management. 650 00:58:14,270 --> 00:58:24,230 In particular, is the need for structural investment. The plan lays out and identifies and stresses multi-benefit opportunities, floodplain restoration. 651 00:58:24,230 --> 00:58:30,690 And the Flood Control Association has absolutely supported that and supported as it played out in the Central Valley Flood Protection Plan. 652 00:58:31,050 --> 00:58:34,770 But as the water resiliency portfolio points out, we need many tools in our toolbox. 653 00:58:35,410 --> 00:58:36,310 Those are two tools. 654 00:58:36,950 --> 00:58:43,690 You're not going to do a multi-benefit project or a Flood Plan restoration project in the middle of downtown Stockton or in the middle of downtown Stockton. 655 00:58:44,550 --> 00:58:47,530 We're still going to need to make traditional structural investments. 656 00:58:48,870 --> 00:58:54,630 And that is highlighted in the Governor's budget as Ms. Vogel identified with funding the Army 657 00:58:54,630 --> 00:58:55,690 Corps of Engineers programs. 658 00:58:56,210 --> 00:59:01,150 But the problem we're seeing is the problem that's identified in the Governor's budget 659 00:59:01,150 --> 00:59:01,670 proposal. 660 00:59:02,010 --> 00:59:02,750 We have two programs. 661 00:59:03,330 --> 00:59:06,590 If you're an urban area and have an Army Corps of Engineers project, states going to step up 662 00:59:06,590 --> 00:59:07,570 and make that cost share. 663 00:59:08,050 --> 00:59:11,570 If you do a multi-benefit project, the state's going to step up and make that cost share. 664 00:59:12,390 --> 00:59:17,050 But if you're a small community, if you're a disadvantaged community, if you're a rural 665 00:59:17,050 --> 00:59:18,630 area, there's no money in this budget. 666 00:59:18,890 --> 00:59:23,590 And the Central via flood protection plan has identified significant need and deficiencies in 667 00:59:23,590 --> 00:59:28,150 these rural areas, these small communities, and we need to have that as a priority in the 668 00:59:28,150 --> 00:59:32,530 water resiliency portfolio as well to make sure that we're getting investment in those. 669 00:59:35,610 --> 00:59:41,790 On Wednesday, coincidentally, I was on a conference call with Bay Area flood interest and 670 00:59:41,790 --> 00:59:45,970 California flood interest, and we're looking for areas where we can find alignment 671 00:59:47,090 --> 00:59:51,090 throughout local agencies and California on flood issues. And two issues in particular 672 00:59:51,090 --> 00:59:53,490 were highlighted in that call. The first is homelessness. 673 00:59:55,870 --> 00:59:59,030 In the water quality section of the 674 00:59:59,030 --> 00:59:59,990 Water Resonancy Portfolio. 675 01:00:00,000 --> 01:00:27,560 So, homelessness in the rivers in floodways needs to be highlighted. I can't think of a greater environmental disaster that's happening right now than the solid waste, untreated waste and hazardous waste. It's in our rivers and streams. And while it acts absolutely is a public crisis and the governor's made it quite dealing with homelessness, we don't have five or ten years of that continued environmental degradation in our streams and rivers while we're trying to do these restoration projects. 676 01:00:27,560 --> 01:00:30,480 We've got to get people out of our rivers and streams. 677 01:00:32,460 --> 01:00:36,620 What was interesting to hear from the Bay Area flood interest and a southern California flood interest is, 678 01:00:37,280 --> 01:00:40,740 in many cases, it's the land use agency that has the flood control responsibility, 679 01:00:41,280 --> 01:00:46,280 and so they're also having the deal with the cleanup aspect of that, 680 01:00:46,280 --> 01:00:47,820 and it's affecting their maintenance budgets. 681 01:00:49,000 --> 01:00:53,360 Here in the central valley, our local maintaining agencies generally don't have their responsibility 682 01:00:53,360 --> 01:00:58,000 for dealing with homelessness except as they're affecting the flood control infrastructure. 683 01:00:58,680 --> 01:01:03,600 And the board has provided a leadership role with that, which was previously AB 137 and now AB 684 01:01:03,600 --> 01:01:10,020 1958. We hope that moves forward and helps us, but clearly there's a greater need across the state 685 01:01:10,020 --> 01:01:15,800 for dealing with the homelessness as part of our flood management strategies. The other item that came 686 01:01:15,800 --> 01:01:20,880 up in that call that is identified in the Water Residency portfolio, but we want to see the 687 01:01:20,880 --> 01:01:28,920 leaders detail on is operation maintenance and the ongoing challenges we have, especially with 688 01:01:28,920 --> 01:01:34,740 these resource agencies requiring compensatory mitigation for ongoing operation maintenance. 689 01:01:36,320 --> 01:01:43,180 As we see at the state level with the maintenance responsibilities that the board has under water 690 01:01:45,480 --> 01:01:51,560 The administration and the legislature's budget isn't always a reflection of what the department says needs to be done. 691 01:01:51,740 --> 01:01:53,360 What their maintenance need is. 692 01:01:53,660 --> 01:01:58,020 We've done really good over the past couple of years in getting funding for deferred maintenance. 693 01:01:58,660 --> 01:02:03,040 Getting our maintenance budget better matching what the demand is. 694 01:02:03,340 --> 01:02:08,040 But what we've seen in the passes when we have an economic downturn that budget for own insurance. 695 01:02:08,040 --> 01:02:23,220 a deferred maintenance backlog builds and now there's compensatory mitigation required for that deferred backlog and the additional budget is not proposed to deal with both those things that deferred maintenance and the mitigation goes with it. 696 01:02:23,740 --> 01:02:30,080 So we appreciate the board providing leadership in the stakeholder outreach to provide input to the plan. 697 01:02:30,380 --> 01:02:33,680 We are going to come back to you with some very specific edits in fact for meeting this afternoon. 698 01:02:33,680 --> 01:02:46,180 And we look forward to working with the administration to finalize this plan and have it be something that has the same broad support, but the center of our flood protection has from the flood control community, environmental community and the farming community. Thank you. 699 01:02:46,260 --> 01:02:46,560 Thank you. 700 01:02:47,260 --> 01:02:47,680 Thank you. 701 01:02:51,260 --> 01:02:51,700 Guilcasio. 702 01:02:56,160 --> 01:02:56,720 Good morning, Guil. 703 01:02:56,720 --> 01:02:57,880 Good morning, Mr. President. 704 01:02:58,780 --> 01:02:59,420 What's that? 705 01:02:59,420 --> 01:03:00,500 I thought you were retiring. 706 01:03:01,000 --> 01:03:02,960 You know, I'm never going to retire. 707 01:03:03,160 --> 01:03:05,700 I'm going to be like a countryman to call back. 708 01:03:05,700 --> 01:03:09,180 I'm working full-time now, but next year could be a different story. 709 01:03:09,940 --> 01:03:13,600 I thought, you know, 36 years ago when I started, I'd have this problem resolved. 710 01:03:14,040 --> 01:03:17,120 You know, we had bulletin one, 92, we're going to get money from a levy program. 711 01:03:17,600 --> 01:03:21,560 I could put in 30 years retire and the Delta would be fixed while we're not there. 712 01:03:22,300 --> 01:03:24,500 And we won't be there for a while. 713 01:03:26,260 --> 01:03:26,300 Yeah. 714 01:03:26,300 --> 01:03:29,460 I could still dream, but it's getting a short time here. 715 01:03:30,420 --> 01:03:37,080 I echo Mr. Reinhardt's comments and also appreciate the fact that the board is understanding 716 01:03:37,080 --> 01:03:41,720 what the plan shows, which is a comprehensive, but then what it doesn't show also, 717 01:03:42,120 --> 01:03:43,460 which does affect us directly. 718 01:03:44,120 --> 01:03:49,560 I want to focus my comments on specifically in the Delta, because I think we've got some 719 01:03:49,560 --> 01:03:54,220 momentum going in the Delta, and it doesn't recognize that, and it doesn't recognize that 720 01:03:54,220 --> 01:03:59,320 need to keep things going in order to keep the water plan in place. 721 01:04:00,120 --> 01:04:02,640 First of all, we state your name for the record. 722 01:04:02,920 --> 01:04:05,020 I'm Sergeant Gilbert Kosio and B.K. Engineers. 723 01:04:08,080 --> 01:04:12,420 So one of the things in the water priorities section it talks about the 724 01:04:12,420 --> 01:04:16,360 levy conveyances to right now is a single conveyance system utilizing the 725 01:04:17,240 --> 01:04:22,040 levy's and that possible earthquake has a probability of 66% 726 01:04:22,040 --> 01:04:29,340 happening in the next 30 years that could disable the levy system. What it fails to acknowledge 727 01:04:29,340 --> 01:04:33,600 that even after a tunnel is built, it's going to be a dual conveyance system, so you still 728 01:04:33,600 --> 01:04:39,800 have to rely on the levees. That single tunnel is not going to resolve the problems. And then 729 01:04:39,800 --> 01:04:44,700 also like President Eger mentioned, until we get to that tunnel, it's got to rely on levees. Now, 730 01:04:44,700 --> 01:04:50,860 you said 10 years, I think, based on some of the design and permitting that has to go on 731 01:04:50,860 --> 01:04:52,840 you're on a couple of lots of these poor construction. 732 01:04:53,280 --> 01:04:56,520 You're talking probably 20 years before you see a tunnel. 733 01:04:56,700 --> 01:04:59,480 So these loveies have to stay up another 20 years, 734 01:05:00,320 --> 01:05:03,040 which is essentially those 30 years 735 01:05:03,040 --> 01:05:04,600 that that probability was thrown out 736 01:05:04,600 --> 01:05:06,320 because that probability came out in the dreams 737 01:05:06,320 --> 01:05:07,480 to study in 2008. 738 01:05:07,580 --> 01:05:10,360 So we're going to be at 30 years before any tunnels in place. 739 01:05:10,740 --> 01:05:12,580 So I hope these loveies stay up to all then. 740 01:05:12,840 --> 01:05:14,400 But I'll be retired, so maybe I won't care. 741 01:05:17,460 --> 01:05:19,700 So what I'm concerned about is that the verbiage 742 01:05:19,700 --> 01:05:25,000 they're using is 2008 based on 2005 levy data. 743 01:05:25,560 --> 01:05:28,300 Since 2005, the Delta Levy program, 744 01:05:28,520 --> 01:05:29,980 which includes your Seventions program, 745 01:05:30,220 --> 01:05:33,280 is spent a tremendous amount of energy and money 746 01:05:33,280 --> 01:05:35,860 on making these levy better. 747 01:05:36,440 --> 01:05:39,900 I estimated that there's about $650 million invested 748 01:05:39,900 --> 01:05:44,600 since 2005 by 200 millions come from the Seventions program 749 01:05:44,600 --> 01:05:47,680 and about 450 from a special projects program. 750 01:05:49,700 --> 01:05:56,280 And also since that time, one of the concerns we had about dreams when it discussed the 751 01:05:56,280 --> 01:06:02,000 susceptibility to seismic action in the Delta was that they overwhelmingly conservative 752 01:06:02,000 --> 01:06:03,580 in some of the parameters they used. 753 01:06:03,980 --> 01:06:08,520 In 2016, the independent science board of the stewardship council held a workshop on seismicity 754 01:06:08,520 --> 01:06:09,100 in the Delta. 755 01:06:09,800 --> 01:06:14,280 And the USGS presented some interesting data because they've set up some motion sensors in 756 01:06:14,280 --> 01:06:17,720 the Delta and happened to have them in place when the NAPA earthquake hit. 757 01:06:17,720 --> 01:06:24,960 And what they found is that instead of amplifying the motion that the delta levees and their 758 01:06:24,960 --> 01:06:30,980 foundation actually attenuated the motion, and they estimated that the dream's overestimated 759 01:06:30,980 --> 01:06:36,740 the force of seismicity and the delta by four times, and then was ever gone back to check 760 01:06:36,740 --> 01:06:43,300 what that would mean to the statement about the levees crumbling during earthquake. 761 01:06:44,720 --> 01:06:52,040 And also, it's been known for a long time by DWR and others, at least 40 years, that when you construct 762 01:06:52,040 --> 01:06:59,660 toberms and widen the base of the levy, you don't totally make them earthquake resistant, 763 01:07:00,220 --> 01:07:04,660 but you do make a more stable after a seismic event, and so you have more material to work 764 01:07:04,660 --> 01:07:05,700 on to rebuild levy. 765 01:07:06,500 --> 01:07:10,240 And a lot of our work we've been doing in the last 15 years has been building toberms. 766 01:07:10,240 --> 01:07:14,260 Our first priority was to get the elevations raised, 767 01:07:14,420 --> 01:07:15,420 which we did in the 90s, 768 01:07:15,540 --> 01:07:18,220 and then now we're doing more stability type work. 769 01:07:19,000 --> 01:07:20,020 So that should be recognized, 770 01:07:20,660 --> 01:07:22,380 and the fact that we've got this momentum 771 01:07:22,380 --> 01:07:24,920 going with the Loveys program should be recognized. 772 01:07:25,180 --> 01:07:26,940 It's something that's that's been beneficial 773 01:07:26,940 --> 01:07:30,460 and can continue if it's explicitly 774 01:07:30,460 --> 01:07:33,620 outlined as one of the priorities for the plan. 775 01:07:34,480 --> 01:07:36,240 And then the next comment on 776 01:07:37,200 --> 01:07:43,920 Delta levies and how they do or aren't included in the plan is the section that talks about regional networks and state support. 777 01:07:44,080 --> 01:08:04,580 These multi-benefit projects, getting stakeholders and partners together, and the Delta levies program is kind of the poster child for that if you don't realize that back in 1988 when it really got kickstarted with SB 34, the plan was we needed to have a program that not only provided the flood benefit, 778 01:08:04,580 --> 01:08:10,820 It focused money on levies that protected water quality and water supply, and it also improved 779 01:08:10,820 --> 01:08:11,320 the habitat. 780 01:08:11,660 --> 01:08:16,060 So for many years, we've had an enhancement requirement, and to this day, we're on the 781 01:08:16,060 --> 01:08:18,120 positive, we've enhanced the environment. 782 01:08:18,720 --> 01:08:25,100 Now, it isn't multi-benefit project by project, but it's multi-benefit on a program, and I 783 01:08:25,100 --> 01:08:29,420 know Rick mentioned earlier that it's hard to get these multi-benefit projects, but if you 784 01:08:29,420 --> 01:08:32,900 look at it programmatically, I think we can work things out a little easier. 785 01:08:34,140 --> 01:08:37,920 And if you look at the beneficiaries, like I said, there's a habitat enhancement, we've 786 01:08:37,920 --> 01:08:42,940 got the water supply, we've got flood control in egg and small communities in the Delta, 787 01:08:43,760 --> 01:08:46,220 but we're at the bottom of the barrel for the state plant and flood control. 788 01:08:46,480 --> 01:08:54,360 So we're also providing the last conveyance of flood waters out of the reaches of the valley. 789 01:08:55,040 --> 01:08:59,560 So the beneficiaries of working on Delta Lovies, you know, stretch the entire valley. 790 01:08:59,560 --> 01:09:03,260 And so it's not just a few farmers that are benefiting its entire state. 791 01:09:03,900 --> 01:09:10,240 So the portfolio should recognize that the Dutleti program was important, can be important, 792 01:09:10,820 --> 01:09:12,540 and should be continued to get funded. 793 01:09:13,560 --> 01:09:14,680 Thank you. 794 01:09:14,940 --> 01:09:15,780 Thank you, Bill. 795 01:09:16,800 --> 01:09:17,080 Joe? 796 01:09:18,100 --> 01:09:18,420 Joe? 797 01:09:21,140 --> 01:09:22,380 Thank you for that. 798 01:09:22,400 --> 01:09:30,000 I wasn't aware of the information about that map earthquake seems like that's very critical information. 799 01:09:30,000 --> 01:09:37,100 information, do you know of any attempt to integrate or absorb that data and make another 800 01:09:37,100 --> 01:09:37,800 evaluation? 801 01:09:38,200 --> 01:09:42,740 Not that I know what I've been on my list of things to do is to try to contact the authors 802 01:09:42,740 --> 01:09:46,500 to see if they've done any more work and improved on it, but certainly the independent 803 01:09:46,500 --> 01:09:51,900 science board hasn't taken on responsibility of expanding the science to figure out what 804 01:09:51,900 --> 01:09:52,480 that means. 805 01:09:52,840 --> 01:09:56,980 Yeah, I could have a big impact on the whole way we look at things in the dull time, so 806 01:09:56,980 --> 01:09:57,760 thank you. 807 01:09:58,980 --> 01:10:00,360 Thank you, go. 808 01:10:02,570 --> 01:10:03,030 I'm a Linda. 809 01:10:10,000 --> 01:10:12,660 I'm a Linda Terry, Central Valley Flood Control Association. 810 01:10:12,840 --> 01:10:14,200 Obviously, Rick did a good job. 811 01:10:15,020 --> 01:10:17,800 Just wanted to add in a couple of things. 812 01:10:18,460 --> 01:10:20,120 Obviously, we're very appreciative. 813 01:10:20,640 --> 01:10:23,820 The administration didn't get just early on and they're providing an opportunity 814 01:10:23,820 --> 01:10:24,960 to come in on a draft. 815 01:10:25,620 --> 01:10:26,840 So that is very nice. 816 01:10:27,600 --> 01:10:30,820 But just high, you know, big picture looking at it too. 817 01:10:30,960 --> 01:10:34,760 We were just really worse surprised to not see a little bit more 818 01:10:34,760 --> 01:10:38,520 focus on your board specifically in light of the 819 01:10:38,520 --> 01:10:40,020 Sunshine Valley Fled Protection Plan. 820 01:10:40,260 --> 01:10:43,840 So for instance, on page 42, prior to that, they've 821 01:10:43,840 --> 01:10:47,860 listed different departments and agencies and actions 822 01:10:47,860 --> 01:10:49,420 that fall underneath them. 823 01:10:49,600 --> 01:10:52,640 And so what we'd like to see is an added in there, if you 824 01:10:52,640 --> 01:10:53,900 will, for a Fled Board. 825 01:10:54,240 --> 01:10:57,080 It may be pull out some of those actions from the Fled Plan 826 01:10:57,080 --> 01:11:00,160 that works so well with what they've already put together. 827 01:11:00,300 --> 01:11:02,840 And I think with the direction that they're headed, 828 01:11:02,840 --> 01:11:07,300 that would really be complimentary, but at this point it's kind of a missed opportunity 829 01:11:07,300 --> 01:11:13,660 unless that gets added in, you know, the definition of resiliency is acknowledging 830 01:11:13,660 --> 01:11:18,660 that bad things are going to happen and being prepared and then being able to recover quickly 831 01:11:19,500 --> 01:11:26,100 and so as was said earlier as the key to both being prepared and recovering quickly is maintenance. 832 01:11:26,100 --> 01:11:35,420 And for the recovery side, having federal funding come in is really important, and it doesn't 833 01:11:35,420 --> 01:11:39,540 matter if you're a project levy that you're responsible for, the Army Corps is going 834 01:11:39,540 --> 01:11:44,640 to require maintenance, but also for those non-project levy's 700 miles in the Delta 835 01:11:44,640 --> 01:11:47,540 non-project FEMA requires maintenance. 836 01:11:48,140 --> 01:11:49,180 So that's it. 837 01:11:49,400 --> 01:11:54,340 I'll just end with, I would really agree with President Edgar, it'd be nice. 838 01:11:54,340 --> 01:11:58,800 I was maybe just a little disappointed that the plan wasn't providing more of the vision of 839 01:11:58,800 --> 01:11:59,640 the outcomes. 840 01:12:00,360 --> 01:12:01,180 Like, where were we headed? 841 01:12:01,260 --> 01:12:02,780 What do we want to try to achieve? 842 01:12:02,880 --> 01:12:08,200 And, of course, the flood plan has some ideas that could help build upon that. 843 01:12:08,220 --> 01:12:12,880 And then just on a personal note, I would say I really agree with Mr. Countryman's comment 844 01:12:12,880 --> 01:12:15,060 about the efficiency after having read it. 845 01:12:15,140 --> 01:12:18,240 And then he said, I'm like, wow, that was something I really saw missing. 846 01:12:18,580 --> 01:12:23,620 And as he said, it's 70-year, 10-year drought, you know, from my personal experience and 847 01:12:23,620 --> 01:12:26,560 working back on the records, there's a drop happens every 10 years. 848 01:12:26,760 --> 01:12:30,520 The question is, you know, how frequently and it's not a matter of, you know, 849 01:12:30,620 --> 01:12:31,760 if it's just when and so. 850 01:12:32,060 --> 01:12:32,560 Thank you. 851 01:12:33,640 --> 01:12:34,500 Thank you, Melinda. 852 01:12:35,660 --> 01:12:38,800 Any other comments from the public on the resiliency portfolio? 853 01:12:42,260 --> 01:12:42,440 Okay. 854 01:12:42,540 --> 01:12:43,600 Thank you. 855 01:12:43,680 --> 01:12:44,340 For Darren. 856 01:12:45,320 --> 01:12:45,500 Okay. 857 01:12:45,920 --> 01:12:48,460 Nancy, thanks very much for being here today. 858 01:12:48,760 --> 01:12:49,740 Appreciate it. 859 01:12:52,250 --> 01:12:57,470 Members were on item eight public safety information item. 860 01:12:57,470 --> 01:13:16,470 And we have, as I indicated before, two items before the board under item 8A, an update on the proposed legislation, and under 8B or overview of the governor's recent executive order, Darren's going to handle both of them. 861 01:13:16,790 --> 01:13:20,250 But one overarching question, Darren. 862 01:13:21,920 --> 01:13:34,300 So with regard to the damage that's being happening on the lovis itself, American River 863 01:13:34,300 --> 01:13:43,960 Flood Control District told me that there's, I believe, 38 miles of lovis in which there 864 01:13:43,960 --> 01:13:49,300 are 148 encampments, is that about right, is that what you are? 865 01:13:50,640 --> 01:13:54,480 I haven't spoken with Mr. Kerr as of late. 866 01:13:54,960 --> 01:13:56,580 I trust what he told you. 867 01:13:57,080 --> 01:13:59,860 Okay, that that was really a surprise. 868 01:14:00,780 --> 01:14:02,300 148 key encampments. 869 01:14:03,300 --> 01:14:03,880 I don't like that. 870 01:14:04,500 --> 01:14:05,360 Do you remember that, Leslie? 871 01:14:06,120 --> 01:14:10,160 Or is that you were at the same meeting as I was? 872 01:14:10,320 --> 01:14:10,580 Yeah. 873 01:14:11,180 --> 01:14:11,800 Is that a bad way? 874 01:14:12,560 --> 01:14:13,560 It was a lot. 875 01:14:13,700 --> 01:14:14,960 I don't recall the exact number. 876 01:14:14,960 --> 01:14:23,820 Yeah, but that was just unbelievable the amount of issued encampments that he has. 877 01:14:24,260 --> 01:14:30,680 The question is for me is, I know you have the legislation going and the governor's 878 01:14:30,680 --> 01:14:36,440 executive orders pretty clear, he wants an inventory of all the surplus state property 879 01:14:36,440 --> 01:14:47,960 with an eye that may be using some parts of it as a way to place shelters for these 880 01:14:47,960 --> 01:14:55,540 folks. And we're obviously going to comply with supplying, I guess, GSA with that 881 01:14:55,540 --> 01:14:59,940 information because they're the ones who are responsible for putting it together. 882 01:15:00,000 --> 01:15:14,200 But is there something else that we can do now to assist these local areas, giving them more assistance 883 01:15:14,200 --> 01:15:24,300 or working with the locals to attempt to solve this problem? Now, for example, I know in city parks, 884 01:15:24,300 --> 01:15:35,840 and you're on the electricity council, you know, we have hours on, you know, the parks are closed after 885 01:15:35,840 --> 01:15:42,700 nine o'clock and if you're in the park you gotta get out. Is there something we could do with hours on the 886 01:15:42,700 --> 01:15:48,940 levies, daylight hours? After seven o'clock at night these levies are closed, can't be on a period. 887 01:15:49,940 --> 01:15:58,260 Can't we do something like that as an immediate issue or, or so, I think, you know, 888 01:15:58,380 --> 01:16:02,100 legislation is going to take a while and we need that and we want to do that. 889 01:16:02,420 --> 01:16:10,480 But it seems to me that there's some things that we could do now to help if the police 890 01:16:11,080 --> 01:16:15,920 and the local officials need that assistance or where they could do it themselves. 891 01:16:15,920 --> 01:16:23,020 I mean, we don't establish the hours on part, but maybe we have to unleave these, I don't know. 892 01:16:23,820 --> 01:16:35,000 But it seems to me, as part of your efforts to resolve this problem, we need a little analysis of what can be done now. 893 01:16:35,220 --> 01:16:43,380 And if we can assist in any way, or whether this is simply a local government city or county issue, that's fine. 894 01:16:43,380 --> 01:16:54,540 But if we have to do something, we need to deal with this right now, not 30 days from now on, and so on, but right now it has to be dealt with. 895 01:16:55,620 --> 01:16:56,480 Thank you, President Egra. 896 01:16:56,480 --> 01:17:00,500 I appreciate your sense of urgency and your question. 897 01:17:01,280 --> 01:17:09,080 I think we'll talk more about that in the next item in terms of urgency and your point about park hours. 898 01:17:09,080 --> 01:17:16,160 We have a stakeholder group that meets in discussion regarding this proposed legislation. 899 01:17:17,140 --> 01:17:25,040 The last meeting we brought up park hours, the response was that it didn't seem helpful 900 01:17:25,040 --> 01:17:37,340 to them because the perception was that this could imply it would be okay to be on the 901 01:17:37,340 --> 01:17:45,580 So it's that was initial reactions, but we continue to meet regularly and I can bring that back and then 902 01:17:45,580 --> 01:17:51,080 pose a more general question about what they think could be done now. 903 01:17:51,080 --> 01:17:51,920 That would be great. 904 01:17:52,620 --> 01:17:53,820 I'll report that back. 905 01:17:53,920 --> 01:17:58,200 And if we can assist in any way, I'm sure the board wants to do that. 906 01:17:59,000 --> 01:18:01,400 This is one of our main priorities. 907 01:18:02,180 --> 01:18:08,640 taking care of what you have, and obviously we're not, so we need to do something. 908 01:18:10,440 --> 01:18:11,320 All right. 909 01:18:11,540 --> 01:18:16,840 So under 8A, which is the update on the proposed legislation? 910 01:18:17,320 --> 01:18:17,640 Yes. 911 01:18:18,200 --> 01:18:18,720 Thank you. 912 01:18:18,840 --> 01:18:21,300 Again, I'd warm down soon with the Flood Board. 913 01:18:21,760 --> 01:18:23,860 So it's a principal civil engineering policy advisor. 914 01:18:25,280 --> 01:18:27,720 With the lead in President Eger, you gave, you know, 915 01:18:27,720 --> 01:18:36,320 last year, we noticed through the media and brought to our attention by the local, some of the 916 01:18:36,320 --> 01:18:43,740 local maintain agencies around here, the illegal actions that were occurring on our 917 01:18:43,740 --> 01:18:48,680 levee system and damaging the significant damaging levee that was happening. 918 01:18:49,900 --> 01:18:57,520 With that, we proceeded to take action, some remember Jim Cooper at that time, also saw the 919 01:18:57,520 --> 01:19:03,920 media and wanted to assist, put forth a, it got in the men bill, and known as AB 137. 920 01:19:04,340 --> 01:19:09,380 That bill failed in committee, but as they say, try, if you don't see it first, see, 921 01:19:09,520 --> 01:19:10,420 try, try again. 922 01:19:11,200 --> 01:19:12,760 So here we are in the next session. 923 01:19:13,820 --> 01:19:22,320 And before I, you move in, I just want to remind folks that there was the need for this, 924 01:19:22,320 --> 01:19:29,860 still remains, as President Agar articulated, the concealing, defacing and destroying of our 925 01:19:29,860 --> 01:19:38,540 levees continue to occur from the last piece of legislation, these entities issued letters 926 01:19:38,540 --> 01:19:44,800 of support to these other members' office. This was a very quick timeline. 927 01:19:49,460 --> 01:19:50,260 The government 928 01:19:50,260 --> 01:19:57,620 to the policy committee very quickly, but did not get out of the appropriations committee 929 01:19:57,620 --> 01:19:58,660 of fiscal committee. 930 01:20:00,460 --> 01:20:07,360 There are some folks that were opposed to the legislation as well as it was written. 931 01:20:08,680 --> 01:20:10,980 And these folks are listed here. 932 01:20:11,580 --> 01:20:19,460 So fast forward and on January 17th, we need focus, we had a little more time to coordinate 933 01:20:19,460 --> 01:20:26,440 our efforts, proud to say that others joined in to introduce, so this is a piece of legislation 934 01:20:26,440 --> 01:20:37,780 now known as AB 1958, and it is a joint authored by some of the members Cooper and Kevin McCarty, 935 01:20:40,660 --> 01:20:48,860 and I apologize I had one to read the, oh there it is of there. Levy maintenance inspection 936 01:20:48,860 --> 01:20:52,280 and protection bill AB-1958. 937 01:20:53,220 --> 01:20:56,320 So we introduced that in the Assembly of the Office to 938 01:20:56,320 --> 01:20:58,520 do that on January 17th. 939 01:20:58,740 --> 01:21:03,080 A couple of minor edits that were done, the words used in 940 01:21:03,080 --> 01:21:07,700 occupy were removed from the language that did cause some 941 01:21:07,700 --> 01:21:12,200 angst, but I wanted to clarify that as a state, we gave 942 01:21:12,200 --> 01:21:16,460 assurances to the federal government to maintain the 943 01:21:16,460 --> 01:21:23,100 state plant flood control system within the federal code, these terms were used in there. 944 01:21:23,620 --> 01:21:31,460 The intent was to only mirror the federal language, but understandingly that it costs some 945 01:21:31,460 --> 01:21:31,840 concerns. 946 01:21:32,700 --> 01:21:37,840 So, when I had to just remove that up front with this new introduction, also added an urgency 947 01:21:37,840 --> 01:21:42,820 statute, which means it'll go on an effect right away if the governor were to sign it, 948 01:21:46,440 --> 01:21:46,440 if it 949 01:21:46,440 --> 01:21:55,400 greater threshold for approval, two-thirds threshold, some additional co-authors were added 950 01:21:55,400 --> 01:22:02,160 on or joined on in this initial introduction, including other some members Gallagher and 951 01:22:02,160 --> 01:22:11,900 Flora and Senators Richard Pan and Dodd. So I think it's a great start. We've got both houses. 952 01:22:11,900 --> 01:22:25,060 We've got by partisan and we've got a representation in the north and the southern parts of the system in the San Joaquin system and the Sacramento area. 953 01:22:25,740 --> 01:22:33,240 I think we'll have more legislators to join on as we continue our outreach process. 954 01:22:33,240 --> 01:22:40,440 Local agency support, so we're continuing to ask local agencies and we appreciate they help 955 01:22:40,440 --> 01:22:45,400 and assistance from the SITRI flight control association on their outreach efforts, and 956 01:22:45,400 --> 01:22:54,100 we're going to continue to seek more support to come in and send letters in support, 957 01:22:54,280 --> 01:22:57,980 and encourage their legislators to join on as well. 958 01:22:57,980 --> 01:23:04,920 that will continue on. We'll wait for it. It's in the 30-day process so we'll wait for it 959 01:23:04,920 --> 01:23:14,380 to go to Rose Committee and then within the 30 days and be assigned to A or multiple committees 960 01:23:14,380 --> 01:23:22,680 as a possibility. We hope and anticipate that it will be assigned to one committee but we'll see 961 01:23:22,680 --> 01:23:30,900 that process goes. And then the flood caucus members as well, I wanted to say that the ad hoc 962 01:23:30,900 --> 01:23:38,720 flood caucus we were out reaching doing outreach to them as well. And continuing our dialogue 963 01:23:38,720 --> 01:23:44,180 with the housing advocates that had concerns in the first place. So we'll be holding meetings 964 01:23:44,180 --> 01:23:51,420 with them and continuing that dialogue seeing that we can find some common ground. And that's it. 965 01:23:51,420 --> 01:23:57,480 So I have for a right now, there's, we'll wait and see how things progress. 966 01:23:58,180 --> 01:24:01,220 Before any questions, if there are any. 967 01:24:03,540 --> 01:24:04,320 Let's see. 968 01:24:07,890 --> 01:24:07,990 Gather. 969 01:24:09,710 --> 01:24:10,850 And that says, what are Garcia? 970 01:24:11,510 --> 01:24:13,290 Yeah, I was wondering where the truth is. 971 01:24:14,510 --> 01:24:20,450 So I would, one, we will be receiving the bill in Assembly Water Park some while I've 972 01:24:20,450 --> 01:24:27,550 review it as a committee. I do think that it may end up in two committees, at least in one 973 01:24:27,550 --> 01:24:32,630 house or another. The thing that I would suggest is continue with what you're doing, but 974 01:24:32,630 --> 01:24:38,870 maybe use your outreach group as an opportunity to think of what those current actions are that 975 01:24:38,870 --> 01:24:45,110 the board can do with its existing authority. This is something that has to be addressed. It is going 976 01:24:45,110 --> 01:24:50,950 be very sensitive. It's going to be very difficult. And since we have that the governor 977 01:24:50,950 --> 01:24:57,190 as the homelessness are, we probably should have this moving with the governor's proposals 978 01:24:57,190 --> 01:25:04,210 as they go forward. This is something that is going to be challenging in the folks that 979 01:25:04,210 --> 01:25:10,110 are working so hard on that front need to know about this as well. It's not that different 980 01:25:10,110 --> 01:25:14,230 than what local, any local agency is dealing with, 981 01:25:14,230 --> 01:25:17,990 except that it's protecting our assets in the state. 982 01:25:19,130 --> 01:25:22,370 I would strongly suggest looking at your current authorities 983 01:25:22,370 --> 01:25:24,850 and seeing how much you can do. 984 01:25:24,870 --> 01:25:26,910 The legislation is always fraught with peril, 985 01:25:27,070 --> 01:25:28,010 as I like to say. 986 01:25:28,410 --> 01:25:29,890 There are a lot of committees to get through. 987 01:25:30,070 --> 01:25:32,750 There's a lot of, even though the two-thirds vote, 988 01:25:32,890 --> 01:25:35,050 it's a very difficult, still difficult threshold. 989 01:25:35,990 --> 01:25:39,870 So I would just suggest sort of all in figure 990 01:25:39,870 --> 01:25:42,990 about everything you can do and move forward. 991 01:25:43,750 --> 01:25:47,730 And we're, our staff are always willing to sit down 992 01:25:47,730 --> 01:25:50,430 in any of the groups to help rainstorm 993 01:25:50,430 --> 01:25:52,190 or try to figure out other ways to work. 994 01:25:53,170 --> 01:25:53,990 Thank you, Kevin. 995 01:25:54,230 --> 01:25:54,770 Appreciate that. 996 01:25:55,010 --> 01:25:55,410 Clyde? 997 01:26:03,430 --> 01:26:04,970 Do you remember the fire bill? 998 01:26:06,450 --> 01:26:10,230 I really didn't like the prior bill at all. 999 01:26:10,550 --> 01:26:13,230 I spoke against it when we discussed it. 1000 01:26:14,090 --> 01:26:16,750 I think so that point, just point number one, 1001 01:26:16,750 --> 01:26:26,070 point number two, I think this is much better, and I think if this board wants to move 1002 01:26:26,070 --> 01:26:30,910 this long, it is already an urgency statute, kind of going to bills comment, we want to 1003 01:26:30,910 --> 01:26:36,470 get something going. This is an urgency statute, so it goes into effect when it's passed 1004 01:26:36,470 --> 01:26:42,390 by the legislature signed by the governor. If this board wants to move this along on the 1005 01:26:42,390 --> 01:26:48,270 The board could become the sponsor of the legislation and put the weight of the board behind 1006 01:26:48,270 --> 01:26:54,750 the bill and we'd have to go through agency, we'd have to go through the governor's office 1007 01:26:54,750 --> 01:27:02,650 if that's to do that process, but that would allow us to push harder on the bill. 1008 01:27:04,090 --> 01:27:10,970 Next point, I'm not really convinced this, the language of the way it's written now in 1009 01:27:10,970 --> 01:27:15,290 AB-1958, really accomplishes what it needs to be accomplished. 1010 01:27:16,190 --> 01:27:19,890 Current law makes it illegal to cut and alter the levy. 1011 01:27:22,230 --> 01:27:27,950 The bill adds a number of additional things that you can't do to the levy, one of which 1012 01:27:27,950 --> 01:27:35,090 is de-face the levy, and all these and that the same is alter, it's de-face, current law, 1013 01:27:35,410 --> 01:27:37,890 can't alter it, now you can't de-face it. 1014 01:27:37,890 --> 01:27:41,710 Okay, so that word, in my opinion, an add-in-e-thing. 1015 01:27:44,110 --> 01:27:47,570 Next word, new word that's added, is destroy. 1016 01:27:49,050 --> 01:27:51,250 Well, you can't, cut it, you can't alter it. 1017 01:27:51,310 --> 01:27:54,930 Under existing law, so what does destroy out, 1018 01:27:54,930 --> 01:27:56,390 I don't think destroy out is anything. 1019 01:27:58,210 --> 01:28:00,330 And then the next one is, can't modify it. 1020 01:28:00,430 --> 01:28:02,750 Well, once again, that's the same as cutting alter, 1021 01:28:03,290 --> 01:28:06,470 which is existing law, so it doesn't add anything. 1022 01:28:06,470 --> 01:28:10,470 The words that are added are, you can't conceal it. 1023 01:28:11,510 --> 01:28:13,770 Now let's see, let's say, how do you conceal a levee? 1024 01:28:14,350 --> 01:28:16,790 Do you bring a blimp in or what do you do? 1025 01:28:17,790 --> 01:28:20,750 I think it's pretty vague there. 1026 01:28:21,250 --> 01:28:25,690 The other thing you're not allowed to do is physically obstruct the levee. 1027 01:28:26,310 --> 01:28:29,810 And then the next one is you cannot visually obstruct the levee. 1028 01:28:30,990 --> 01:28:33,730 And I don't not sure exactly what that means. 1029 01:28:33,730 --> 01:28:42,890 And I think when we talked about this legislation and at least in my concept of what the problem is, 1030 01:28:43,330 --> 01:28:52,430 is that the water level comes up and people move out of the floodplain because it's wet, 1031 01:28:52,970 --> 01:28:56,890 and they excavate, they make cuts in the levees so they can have sleeping pads. 1032 01:28:57,650 --> 01:29:01,130 That is illegal under current law. 1033 01:29:01,350 --> 01:29:02,270 Can't cut and alter. 1034 01:29:02,550 --> 01:29:03,350 Existing law. 1035 01:29:03,390 --> 01:29:04,090 Can't cut. 1036 01:29:04,410 --> 01:29:05,230 You can't alter. 1037 01:29:06,090 --> 01:29:08,530 Making that cut is already illegal. 1038 01:29:09,710 --> 01:29:15,150 The problem is that we don't find people cutting and altering the levy. 1039 01:29:15,290 --> 01:29:16,930 You don't find the guy with the shovel. 1040 01:29:16,930 --> 01:29:18,110 You find the guy with the shovel. 1041 01:29:18,310 --> 01:29:19,070 You got him. 1042 01:29:19,610 --> 01:29:25,110 The problem is that it's been cut and there's somebody sleeping there. 1043 01:29:25,110 --> 01:29:30,290 Now, did that, that's when we find it because we don't have people there all the time. 1044 01:29:30,810 --> 01:29:32,990 So, you don't have people right there. 1045 01:29:33,990 --> 01:29:37,430 So, you've got somebody sleeping, what can you do with it? 1046 01:29:37,770 --> 01:29:41,090 Is that person he's got a sleeping bag out there or maybe a little tent? 1047 01:29:42,330 --> 01:29:44,490 Is that, can we, you know, do we get it? 1048 01:29:44,870 --> 01:29:47,050 You're visually obstructing a levy? 1049 01:29:47,210 --> 01:29:47,870 Is that what he's doing? 1050 01:29:48,410 --> 01:29:50,530 Or physically obstructing or concealing? 1051 01:29:51,750 --> 01:29:52,950 I think those are. 1052 01:29:52,950 --> 01:29:57,010 I mean, I think the issue here is you can't camp on the levee. 1053 01:29:57,190 --> 01:29:59,890 You can't camp and you can't build structures on the levee. 1054 01:30:00,000 --> 01:30:25,280 Unless you have permission, that's what we really need to do. Then we've got, then you've got some teeth. You can, then we can go out and put up signs that say, you can't camp on the levy. If you use this law, you could go in there and you could put a big sign up on the American Reparkway out there that says, you cannot, it is against a lot of physically obstruct the levy. People are going to walk by that sign and go, huh? 1055 01:30:28,130 --> 01:30:31,830 So I think, you know, my suggestion is take, you know, 1056 01:30:31,830 --> 01:30:36,830 that we ought to take a look at what the words mean to people. 1057 01:30:37,110 --> 01:30:39,190 What does it mean to the judicial system? 1058 01:30:39,330 --> 01:30:41,910 What does it mean to the policemen who's out there 1059 01:30:41,910 --> 01:30:43,190 or the park ranger or something? 1060 01:30:44,310 --> 01:30:46,030 All right, thank you. 1061 01:30:46,790 --> 01:30:51,430 I think the salt gets back to the point that Catherine made, Darren. 1062 01:30:54,130 --> 01:30:56,530 We'll stick with the legislation, see how it goes. 1063 01:30:57,930 --> 01:30:59,870 But if you're interested in doing something right away, 1064 01:30:59,870 --> 01:31:02,390 we need to really look at the existing authority. 1065 01:31:03,390 --> 01:31:09,510 That's where we need to focus, because we can't wait any longer for this, especially in the winter. 1066 01:31:10,330 --> 01:31:11,470 Right, we'll keep doing that. 1067 01:31:11,830 --> 01:31:21,250 You know, just as a reminder, so this stakeholder group consisting of representatives from the Central 1068 01:31:21,250 --> 01:31:24,870 flood control association, R-D-1,000, 1069 01:31:24,870 --> 01:31:26,510 a micro-reflect control district, 1070 01:31:27,330 --> 01:31:28,810 Sacramento City, 1071 01:31:30,370 --> 01:31:32,330 and the attorneys were involved as well, 1072 01:31:32,650 --> 01:31:36,010 and so that these words to, 1073 01:31:36,010 --> 01:31:39,410 whatever McDonald's point were, 1074 01:31:39,410 --> 01:31:43,650 the group proposed this for to the assembly member. 1075 01:31:44,130 --> 01:31:47,810 I'm happy to take this back to that group 1076 01:31:47,810 --> 01:31:50,590 and the assembly member and see if they'd be willing to, 1077 01:31:50,590 --> 01:31:56,930 If they want to alter it, if that's the sports desire, or, so I'm guessing I'm seeking direction 1078 01:31:56,930 --> 01:32:03,170 from this board, if to keep going with the current, because there will be opportunity to change 1079 01:32:03,170 --> 01:32:08,130 or I'm sure things, you know, I do the process, things will change anyway, but I wanted 1080 01:32:08,130 --> 01:32:16,070 to make sure I understand this board's direction clearly about the language, about reaffirming 1081 01:32:16,070 --> 01:32:24,030 Our last time we spoke, there was the board's desire to submit a letter of support because 1082 01:32:24,030 --> 01:32:25,150 it felt in committee. 1083 01:32:25,570 --> 01:32:29,130 We did not proceed with that letter, but I want to reaffirm that the board's desire to 1084 01:32:29,130 --> 01:32:29,610 submit that. 1085 01:32:29,870 --> 01:32:36,810 I think the board wants you to proceed with the changes that have been accepted, but I think 1086 01:32:38,010 --> 01:32:40,270 we're based on what Katherine said. 1087 01:32:40,270 --> 01:32:49,390 This is going to be a long, hard effort and, you know, it's not going to be any time soon. 1088 01:32:49,870 --> 01:32:55,790 But this other fork, this other avenue, is where I think she's recommending, 1089 01:32:56,950 --> 01:33:01,750 and I am too, that we focus on what we can do under our existing authorities. 1090 01:33:03,090 --> 01:33:07,550 And, you know, I think we can do something. We ought to be able to do something. 1091 01:33:11,410 --> 01:33:12,290 I 1092 01:33:15,780 --> 01:33:23,420 think board member Rick Donald has raised my consciousness considerably with his comments 1093 01:33:23,420 --> 01:33:28,320 today and I sincerely appreciate what you had to say. 1094 01:33:29,640 --> 01:33:36,980 It's true that mutilating or damaging the levees is already against the law. 1095 01:33:37,600 --> 01:33:45,000 It's the campaign that's a problem because you can find the people that are there 1096 01:33:45,000 --> 01:33:52,580 camping and you can do something about it and maybe you know in the legislation we 1097 01:33:52,580 --> 01:34:01,180 just need to say already it's against a lot to do this and this and to assure 1098 01:34:01,180 --> 01:34:10,760 that that can be managed or whatever that right legal words are. We need to make it clear that 1099 01:34:10,760 --> 01:34:17,900 camping is prohibited on the levees are within 10 feet of the base of the levee and that would 1100 01:34:17,900 --> 01:34:24,960 give us something that could actually be enforced and I appreciate what he had to say about that. 1101 01:34:25,080 --> 01:34:30,200 I hadn't thought about it like that before and I support what he had to say there. 1102 01:34:31,180 --> 01:34:46,170 Thank you, Jewel. Okay, Darren. Okay. Now under item four. Yeah, eight be that fourth. Okay, so item eight beats and on the top leg of of homelessness. 1103 01:34:48,030 --> 01:34:58,750 The governor issued an executive order and desk 23 dash 20 back in January and thank 1104 01:35:25,860 --> 01:35:26,180 you, Wendy. 1105 01:35:27,490 --> 01:35:39,350 Okay, executive index 23-20, it noted that the new point in time count, from HUD, that the 1106 01:35:39,350 --> 01:35:47,430 approximate number of homelessness have gone up to over 151,000 from 130,000 back in 2017, 1107 01:35:48,030 --> 01:35:51,710 and over 108 of those are unsheltered. 1108 01:35:51,710 --> 01:36:13,270 200 counties the cities have declared a shelter crisis, and there's been already 2.7 billion dollars in new funding these last couple years that the government has issued for safety net services and limiting barriers to get navigation centers and temporary housing bill. 1109 01:36:13,270 --> 01:36:18,670 And they acknowledge that requires innovation, solutions require innovation, cooperation, and 1110 01:36:18,670 --> 01:36:23,070 the sense of urgency as President Eger articulated, and that this is a matter of state-wide 1111 01:36:23,070 --> 01:36:23,770 importance. 1112 01:36:25,030 --> 01:36:31,590 I just want to note, you know, back in October of last year, P.P.I.C. as Paul noted that homelessness 1113 01:36:31,590 --> 01:36:40,410 is one of the top issues facing the state in addition to the economy. 1114 01:36:40,410 --> 01:36:50,990 it. So to respond to that as executive order, I think it's very innovative in and of 1115 01:36:50,990 --> 01:36:57,790 the self and employees, current state resources, getting back to the comments we heard earlier 1116 01:36:57,790 --> 01:37:04,810 about what existing authorities this board has and what can we do now. I think I want to 1117 01:37:04,810 --> 01:37:09,030 commend the governor's office, I think that's exactly what they're doing here with this executive 1118 01:37:09,030 --> 01:37:15,810 order. They're requiring all state agencies to develop accountability metrics by the end of 1119 01:37:15,810 --> 01:37:21,490 next month, February 28th, by 2020, that include Department of Finance, Department of General 1120 01:37:21,490 --> 01:37:26,430 Services, Department of Transportation, Office of State White Health Planning and Development, 1121 01:37:27,350 --> 01:37:36,530 and California Department of Food and Agriculture. They are ordering a establishment of 1122 01:37:36,530 --> 01:37:40,730 access and housing and services fund within the Department of Social Services. 1123 01:37:42,030 --> 01:37:47,430 This fund will be able to receive state appropriations and donations from nonprofits 1124 01:37:47,430 --> 01:37:51,330 and private entities, some encouraging public private partnerships. 1125 01:37:52,690 --> 01:37:57,050 They want to rapidly increase housing options by the end of this month. 1126 01:37:57,710 --> 01:38:00,570 So to that end, President Eger, you referred to this earlier too. 1127 01:38:00,830 --> 01:38:04,570 The Department of Journal Services, DGS, they've been tasked to identify excess state 1128 01:38:04,570 --> 01:38:11,930 and the state facilities that can be used by our local partners today, for housing which includes 1129 01:38:11,930 --> 01:38:18,950 our own land management authorities, they're looking at our inventory as well that they'll 1130 01:38:18,950 --> 01:38:24,210 then provide back to us so we can assess whether they would be feasible to provide shelter. 1131 01:38:25,750 --> 01:38:30,550 They're ordering the Department of Transportation to develop a model lease template to allow 1132 01:38:30,550 --> 01:38:35,110 cities and counties to use cow trans property for shelter. 1133 01:38:36,390 --> 01:38:42,510 And they're also asking an ospada of the state-wide health planning development to look 1134 01:38:42,510 --> 01:38:50,450 at any decommissioned hospitals as an opportunity for shelter to be utilized as shelters 1135 01:38:50,450 --> 01:38:51,650 as well. 1136 01:38:51,870 --> 01:38:55,310 And then finally, let me ask a question there. 1137 01:38:55,310 --> 01:39:04,350 Disage pod have authority over decommissioned hospitals like a county hospital, or would that be the county board? 1138 01:39:06,530 --> 01:39:15,430 I don't know the exact answer that I could tell you theage pod though, as their charge is to oversee permitting for hospitals. 1139 01:39:15,430 --> 01:39:26,210 You know, a lot of the county hospitals are decommissioned or operating on their own now, 1140 01:39:26,390 --> 01:39:28,750 because they can't comply with Auspots. 1141 01:39:29,290 --> 01:39:30,470 What about those? 1142 01:39:31,030 --> 01:39:31,790 That's a good question. 1143 01:39:32,090 --> 01:39:33,610 I can we can do that. 1144 01:39:33,850 --> 01:39:35,810 Jane, you probably know more about that than I do. 1145 01:39:39,500 --> 01:39:41,840 I wish that I did. 1146 01:39:42,560 --> 01:39:48,600 Beard County closed decommission and provides no county hospital services since 1972. 1147 01:39:49,800 --> 01:39:50,680 Oh, wow. 1148 01:39:50,720 --> 01:39:52,820 So, there you are. 1149 01:39:53,000 --> 01:39:53,640 Yeah, there you are. 1150 01:39:53,740 --> 01:39:55,000 Stake money to place in. 1151 01:39:55,000 --> 01:39:56,780 But what happened to the building? 1152 01:39:57,220 --> 01:39:58,240 Did they tear it on the building? 1153 01:39:59,560 --> 01:40:00,780 Um, part of it. 1154 01:40:00,840 --> 01:40:02,460 Um, it's always been county owned. 1155 01:40:03,260 --> 01:40:05,220 That I know because my mother was born there. 1156 01:40:05,300 --> 01:40:05,440 Yeah. 1157 01:40:05,600 --> 01:40:07,860 In the 20s, I, I wasn't there. 1158 01:40:10,320 --> 01:40:15,040 And over decades converted to other offices, completely altered. 1159 01:40:17,500 --> 01:40:17,700 Good. 1160 01:40:18,620 --> 01:40:19,780 The orts for incarceration. 1161 01:40:20,980 --> 01:40:21,820 I don't go. 1162 01:40:23,040 --> 01:40:23,940 I certainly can do that, President. 1163 01:40:24,120 --> 01:40:24,360 I can do that. 1164 01:40:24,360 --> 01:40:25,980 Not every county has a county hospital. 1165 01:40:29,310 --> 01:40:34,530 There's also orders for many agencies, food and agriculture, general services, housing 1166 01:40:34,530 --> 01:40:38,970 community development, department social services, office and emergency services 1167 01:40:38,970 --> 01:40:50,190 to look at fairgrounds where shelter crisis has been, in effect, and see if those would be opportunities to house or shelter people. 1168 01:40:52,130 --> 01:40:59,910 So, a lot of inventorying going on, what have we got, and what can we use to, as shelters for folks. 1169 01:41:00,890 --> 01:41:09,910 Also, by the immediately, it's kind of a triage response until at least until September 30th. 1170 01:41:10,850 --> 01:41:15,010 DGS is to supply 100 travel trailers from the state fleet. 1171 01:41:15,650 --> 01:41:26,910 They're the emergency medical services authorities to supply complimentary modular tank structures and temporary emergency housing and deliver health and social services to communities throughout the state. 1172 01:41:26,910 --> 01:41:30,050 There's some qualifications for that. 1173 01:41:30,330 --> 01:41:36,150 You had to have declared a shelter crisis under government code and local partners have 1174 01:41:36,150 --> 01:41:40,610 to have to pass these deploy and operate and maintain those facilities. 1175 01:41:41,530 --> 01:41:46,750 They also need to make support services available and they need to report back their data 1176 01:41:46,750 --> 01:41:52,230 that they've obtained based on metrics that need to be determined as stated earlier. 1177 01:41:54,120 --> 01:42:04,560 And then finally, a multi-agency state strike team is being ordered from the agencies listed 1178 01:42:04,560 --> 01:42:05,560 above here. 1179 01:42:06,400 --> 01:42:11,800 They would be coordinated by the homeless and coordinating financing council and they provide 1180 01:42:11,800 --> 01:42:17,060 technical assistance and targeted direct support to county cities and public transit agencies. 1181 01:42:18,100 --> 01:42:24,040 Lastly, the water also asks local governments, transit agencies, non-profits, school districts, 1182 01:42:24,380 --> 01:42:29,360 faith-based organizations to assess their own resources and abilities to provide shelter. 1183 01:42:31,240 --> 01:42:34,980 So, this is all hands on deck. 1184 01:42:35,740 --> 01:42:40,260 What if you got from state all the way down to the local level? 1185 01:42:40,260 --> 01:42:47,240 So, how do we employ private help from donations to the fund I mentioned earlier? 1186 01:42:49,500 --> 01:42:57,040 So it's really trying to, I feel, make, have the state lead the way in utilizing its 1187 01:42:57,040 --> 01:43:05,750 current resources and also demanding, asking, pleading, local agencies to do everything that 1188 01:43:05,750 --> 01:43:11,730 they can as well, to really address this issue, this crisis that we have right now. 1189 01:43:13,050 --> 01:43:14,690 With that, I'll take any. 1190 01:43:15,050 --> 01:43:23,770 Are you going to follow up with the Andrea and provide a list of properties to the general services? 1191 01:43:24,710 --> 01:43:31,130 Yes, Andrea, if you have any direct questions for her, but she and I spoke, so DGS is looking 1192 01:43:31,130 --> 01:43:32,090 at our inventory as well. 1193 01:43:32,130 --> 01:43:38,650 They will provide us a list of our inventory properties, and then we'll assess it whether 1194 01:43:38,650 --> 01:43:41,690 it's feasible, for instance, I think you have a call 1195 01:43:41,690 --> 01:43:42,950 of one that we saw. 1196 01:43:43,250 --> 01:43:46,870 They will provide us with the list of our properties, 1197 01:43:47,090 --> 01:43:48,510 because they have a list? 1198 01:43:49,930 --> 01:43:53,870 It's their inventory, it's in their database. 1199 01:43:54,450 --> 01:43:54,590 OK. 1200 01:43:55,830 --> 01:43:56,270 And that's it. 1201 01:43:56,270 --> 01:43:57,570 Well, in ours is better. 1202 01:43:58,030 --> 01:44:01,030 You can look at a map and you can see 30 acres. 1203 01:44:01,950 --> 01:44:03,330 And those structures on there, and you 1204 01:44:03,330 --> 01:44:04,190 say this will that. 1205 01:44:04,330 --> 01:44:05,830 And you go see it, and it's underwater. 1206 01:44:06,410 --> 01:44:06,610 Yeah. 1207 01:44:07,330 --> 01:44:07,930 That's right. 1208 01:44:07,930 --> 01:44:11,010 So it means some refinement. 1209 01:44:13,290 --> 01:44:16,010 So when they give us, they're going to provide us 1210 01:44:16,010 --> 01:44:17,870 with the list and we're going to correct it. 1211 01:44:18,110 --> 01:44:19,610 We're going to use your knowledge. 1212 01:44:19,930 --> 01:44:21,630 We're going to evaluate whether, OK. 1213 01:44:22,010 --> 01:44:23,570 So you'll remember there was one. 1214 01:44:24,150 --> 01:44:25,390 We, and I want to end the location. 1215 01:44:26,270 --> 01:44:28,890 But when we went out there, it looked great on a map. 1216 01:44:28,950 --> 01:44:31,410 But when you went out there, it was in a detention basin. 1217 01:44:32,530 --> 01:44:34,650 So that needs to be followed up by the way. 1218 01:44:34,650 --> 01:44:39,710 Well, we, uh, and it needs to be a contract. I mean, we, we on the property, right? 1219 01:44:40,610 --> 01:44:45,210 Yes. Well, whoever is doing what they're doing on that property, it looks like a detention 1220 01:44:45,210 --> 01:44:50,970 basin, which is fine. We got to find out whether we have a contract with them. 1221 01:44:53,020 --> 01:44:53,760 We'll definitely take 1222 01:44:53,760 --> 01:44:59,940 it. Yeah. Yeah. So when we, we see that, we'll, we'll evaluate this property, and then we'll provide 1223 01:45:00,000 --> 01:45:04,280 I'd feed back to DGS, which ones are feasible. 1224 01:45:04,920 --> 01:45:10,940 Okay, could we run that by the board just as an informational item? 1225 01:45:11,020 --> 01:45:11,580 Absolutely. 1226 01:45:12,060 --> 01:45:15,820 Some of us have been through the NIMB wars a little bit. 1227 01:45:16,000 --> 01:45:18,140 And I think we could provide some input here. 1228 01:45:26,520 --> 01:45:28,480 Oh, Jane. Okay, sure. 1229 01:45:31,140 --> 01:45:36,540 A lot of this that you're talking about in executive order is not directly related to our responsibilities, 1230 01:45:36,540 --> 01:45:38,960 but we're on board. 1231 01:45:39,160 --> 01:45:43,520 We are citizens in live in this state. 1232 01:45:43,700 --> 01:45:45,160 So we know what the issue is. 1233 01:45:46,100 --> 01:45:48,460 I don't, I'm not an A and A in these task forces, 1234 01:45:48,600 --> 01:45:50,880 and I don't know if people from Buc County are part of them, 1235 01:45:50,940 --> 01:45:54,660 but they ought to be in our county, 50,000 people 1236 01:45:54,660 --> 01:45:59,040 became homeless on November 8th, 2018, 1237 01:45:59,580 --> 01:46:02,180 with the campfire that destroyed a town. 1238 01:46:02,740 --> 01:46:05,580 So we've been living with that in our communities, 1239 01:46:05,580 --> 01:46:08,820 our backyards, our parks, and everything since then. 1240 01:46:08,920 --> 01:46:11,140 So there's a cute need for shelter. 1241 01:46:13,320 --> 01:46:17,880 And it's just compounded at, so I can, the fact that the point in time went up, 1242 01:46:18,180 --> 01:46:22,220 the lot of that was attributed to the fires that occurred in people's homes were destroyed. 1243 01:46:23,680 --> 01:46:25,220 And so there's a lot that needs to be done. 1244 01:46:25,300 --> 01:46:28,140 I think this executive order is exactly what needed to be done. 1245 01:46:28,220 --> 01:46:29,980 The governor said, this is a crisis. 1246 01:46:30,540 --> 01:46:32,380 Start acting, quit saying what the problem is. 1247 01:46:32,380 --> 01:46:41,560 We all know, and speaking with people, where we don't want homelessness to be, we gotta change that conversation to, where can we place them? 1248 01:46:41,820 --> 01:46:48,660 This is not like housing is available. It's not, so we've got to figure it out, and so we'll do what we can. 1249 01:46:48,960 --> 01:46:53,260 But people in a dangerous situation, a floodpour in land, it's not the answer. 1250 01:46:54,500 --> 01:46:59,020 We're only once that, so we'll step forward and do what we can. 1251 01:46:59,020 --> 01:47:04,550 So it's it's a big deal. Yeah, it is. You haven't already said quit talking about do something 1252 01:47:05,360 --> 01:47:11,400 You may have seen the article today in the paper where several mayors in the state are meeting with the the 1253 01:47:11,400 --> 01:47:17,320 Present administration. I believe today as well to talk about this this issue 1254 01:47:17,900 --> 01:47:21,960 So we all talk it's time to do something people are in need. 1255 01:47:24,670 --> 01:47:25,710 Okay, they 1256 01:47:29,410 --> 01:47:39,930 The action item, then, Andrea, if you could, is when we get that list of properties boarded 1257 01:47:39,930 --> 01:47:43,570 like to look at it, just as an information item before that submitted. 1258 01:47:45,490 --> 01:47:52,490 But I guess what the Department of General Services is, they have a list, they want our analysis 1259 01:47:52,490 --> 01:47:53,970 of it. 1260 01:47:53,970 --> 01:47:59,390 And then we cement it back, but before we cement it back, we'd like to see that. 1261 01:48:06,320 --> 01:48:08,420 Any questions, other questions from the ward? 1262 01:48:08,680 --> 01:48:10,500 Anything from the audience on this issue? 1263 01:48:14,070 --> 01:48:14,190 Okay. 1264 01:48:14,810 --> 01:48:15,190 Thank you. 1265 01:48:15,290 --> 01:48:15,990 Thank you, Darren. 1266 01:48:17,130 --> 01:48:20,350 Okay, at this time, we're going to take a little break, John, 1267 01:48:20,710 --> 01:48:26,790 apologize for this, but we need a break for our court reporter. 1268 01:48:27,470 --> 01:48:31,330 We'll be back at, what is it, 10th? 1269 01:48:43,100 --> 01:48:43,540 Thank 1270 01:49:29,940 --> 01:49:35,080 you very much, President Neger, Vice President Dolan, and Chief Engineer, right. 1271 01:49:36,960 --> 01:49:41,120 My name is John Passch. I'm Chief of Hydrology and Flood Operations with the Department of Water Resources, 1272 01:49:41,240 --> 01:49:45,220 and I appreciate the opportunity to deliver the departments update on our activities. 1273 01:49:46,500 --> 01:49:54,480 First thing I want to do is just, you know, call out the written report of activities that we provide to the board every month, 1274 01:49:54,480 --> 01:49:58,560 and just comment on the substantial body of work 1275 01:49:58,560 --> 01:50:02,340 that's identified in there as the Department Finist 1276 01:50:02,340 --> 01:50:05,220 that the Department Finist off in 2019. 1277 01:50:09,640 --> 01:50:11,160 But moving forward, what you have to look forward 1278 01:50:11,160 --> 01:50:14,560 to in February is the beginning of our issuance 1279 01:50:14,560 --> 01:50:15,960 of bullets in 120. 1280 01:50:17,000 --> 01:50:19,520 Bulletin 120 is the publication issued four times a year 1281 01:50:19,520 --> 01:50:22,300 in the second week of February, March, April and May 1282 01:50:22,300 --> 01:50:24,540 by the Department of Water Resources, 1283 01:50:25,440 --> 01:50:31,580 initially dating back to February 1st, 1930. Our California cooperative snow survey program 1284 01:50:31,580 --> 01:50:36,440 forecast seasonal in water year runoff for the major snow bearing watersheds in California. 1285 01:50:37,200 --> 01:50:42,320 It's bulletin 120 provides seasonal in water year forecast or runoff volume for each of the major 1286 01:50:43,140 --> 01:50:51,320 watersheds. It is qualitative. I want to contrast this with one of the items on page 6 of our written report. 1287 01:50:52,560 --> 01:50:59,260 You'll see that the staff issued a water supply index forecast for conditions is of December 1, 2019. 1288 01:51:00,200 --> 01:51:07,280 The Sacramento Valley Index was forecast at 7.3, based on the 50% exceedants, and is classified as below normal. 1289 01:51:08,120 --> 01:51:14,620 The Samuel King Valley Index was forecast at 2.2, based on the 75% exceedant level, and is classified as dry. 1290 01:51:14,620 --> 01:51:22,660 That water supply index is qualitative, falling into 105 categories, what above normal, below normal and dry and critical. 1291 01:51:24,870 --> 01:51:27,910 So you'll look forward to that bullet at 120, starting next month. 1292 01:51:30,900 --> 01:51:34,540 You're going to receive some project updates that are already identified later in your agenda. 1293 01:51:34,820 --> 01:51:37,520 Did you want to mention that item number two there. 1294 01:51:38,300 --> 01:51:41,240 The storm damage, emergency rehabilitation program summary. 1295 01:51:41,840 --> 01:51:44,860 We anticipate that showing up on your February agenda. 1296 01:51:45,240 --> 01:51:48,240 But immediately after me, you'll hear from the date, John. 1297 01:51:48,820 --> 01:51:50,300 That's what we're targeting is to be worried. 1298 01:51:50,660 --> 01:51:52,680 I know there were some questions about when that'll show up. 1299 01:51:52,680 --> 01:51:53,840 I don't think you'll have to wait long. 1300 01:51:54,240 --> 01:51:54,840 Okay, great. 1301 01:51:58,990 --> 01:52:02,510 But you will hear from, from Wade Wiley and his team on our, 1302 01:52:02,630 --> 01:52:04,830 we deliver our 2019 Lib in Spectre Report, 1303 01:52:04,830 --> 01:52:07,490 and you'll hear also from Kyle Bickler and his team 1304 01:52:07,490 --> 01:52:09,750 on the lower L-Corn Basin Libby setback project. 1305 01:52:14,490 --> 01:52:16,290 I had a chance to speak with our state climatologist, 1306 01:52:16,610 --> 01:52:18,710 Dr. Anderson, who could not be here today, 1307 01:52:19,030 --> 01:52:21,130 yet had some information that he wanted to share regarding 1308 01:52:21,130 --> 01:52:26,570 the weather outlook, December 3, February is historically our wetest period with half of the 1309 01:52:26,570 --> 01:52:32,290 annual average precipitation expected in these three months. This has also historically been 1310 01:52:32,290 --> 01:52:37,490 when our major flood events have occurred. December through the Climate Prediction Center still 1311 01:52:37,490 --> 01:52:41,970 favors the drier than average winter for California. This will likely manifest itself in 1312 01:52:41,970 --> 01:52:47,150 extended dried periods between an active week or two, iterably, through the winter. And please note 1313 01:52:47,150 --> 01:52:52,730 that in an active pattern, any unusually large atmospheric river can bring flooding conditions 1314 01:52:52,730 --> 01:52:54,030 to the Central Valley. 1315 01:52:56,180 --> 01:53:04,440 John, just on Mike's prior presentations with the board, he indicated 1316 01:53:04,440 --> 01:53:15,180 that he and his team are working on a new methodology for predicting the extent of flooding 1317 01:53:15,180 --> 01:53:21,280 essentially the most probable flood in particularly the San Joaquin and light of climate 1318 01:53:21,280 --> 01:53:28,900 change. He's working on another methodology to include in the plan. The next update of 1319 01:53:28,900 --> 01:53:34,080 the flood plan. And at some point when he's ready to come before the board, I think some 1320 01:53:34,080 --> 01:53:42,960 of us would like to hear what that new method ought to let you probably don't understand what 1321 01:53:42,960 --> 01:53:44,060 talking about half the time, 1322 01:53:46,140 --> 01:53:52,140 but maybe Joe does, but he said that he's working on that would 1323 01:53:52,140 --> 01:53:56,140 be interested in an update when he gets a chance and has a time. 1324 01:53:56,700 --> 01:53:56,880 Sure. 1325 01:53:57,060 --> 01:53:59,640 I'm sure that could be scheduled and worked out either, either. 1326 01:54:00,000 --> 01:54:03,840 Well, when he's meeting or one of the coordinating meetings that you have, and we can work 1327 01:54:03,840 --> 01:54:09,160 that out with Mary Jimenez, Eric Sy and the Eric who's involved in the planning team. 1328 01:54:09,160 --> 01:54:37,140 Yeah, there's some language in the flood plan, and it came in right at the end where we were finalizing the recent update about that issue, climate change, the effects on the sandwalking, and so on, but that needs to be really fleshed out a little bit in the new update, and part of the work we're going to be doing depends on his analysis and his projection, so. 1329 01:54:37,960 --> 01:54:56,800 Just let you know that I asked to meet with Mike, and we've spent about an hour going over different ways of analyzing the climate change impacts from north to south through the basin and ways to describe it better. 1330 01:54:56,800 --> 01:55:01,960 And so I think we found some things that will look good 1331 01:55:01,960 --> 01:55:06,760 and I'm pretty sure he'll be coming in with some more information on that. 1332 01:55:06,800 --> 01:55:09,840 But I wanted you to know that I did meet with them and we did discuss this. 1333 01:55:10,020 --> 01:55:17,800 Okay, that'd be great if he's at a point where he's ready to kind of lay out 1334 01:55:19,160 --> 01:55:20,680 based off on your input. 1335 01:55:20,880 --> 01:55:24,020 What he wants to do, that would be a good time to brief the board. 1336 01:55:24,020 --> 01:55:27,140 Okay. Thanks. That's great, Joe. 1337 01:55:30,550 --> 01:55:37,530 Sure. I'll continue then with a while we're at so far, water year 2020, precipitation is below average. 1338 01:55:39,070 --> 01:55:47,670 For most of the state with 64% of average in the Sacramento, 58% in the San Joaquin, and 63% for the Telerian decks. 1339 01:55:48,910 --> 01:55:55,910 Our statewide snow pack is also below average, 81% in northern Sierra, 73% for the central 1340 01:55:55,910 --> 01:56:00,530 Sierra, and 75% for the southern Sierra, and those numbers were pulled off of C-deck 1341 01:56:00,530 --> 01:56:00,990 yesterday. 1342 01:56:02,890 --> 01:56:04,650 Temperatures have generally been above average. 1343 01:56:05,710 --> 01:56:10,010 However, our statewide reservoir storage is above average, with most flood control reservoirs 1344 01:56:10,010 --> 01:56:11,110 near their top of conservation. 1345 01:56:15,520 --> 01:56:19,740 Looking ahead, multiple sources suggest a dryer than average outcome for the winter and 1346 01:56:19,740 --> 01:56:25,260 year of 2020. The figure on the left is a product by Noah's 1347 01:56:25,260 --> 01:56:28,560 Climate Prediction Center. They're a national multi-model and 1348 01:56:28,560 --> 01:56:31,480 ensemble global forecast model generates 90-day precipitation 1349 01:56:31,480 --> 01:56:37,720 outlooks with January 2020 initializations. This forecast is for the 1350 01:56:37,720 --> 01:56:41,900 period of February, March, and April. Red indicates that a significant 1351 01:56:41,900 --> 01:56:47,960 dry anomaly is forecast. The figure on the right is a product by a center 1352 01:56:47,960 --> 01:56:49,760 for Western weather and water extremes, 1353 01:56:50,340 --> 01:56:52,400 so affiliated with scripts at UCC and Diego, 1354 01:56:52,860 --> 01:56:55,380 with data courtesy of the Plurprism Climate Group 1355 01:56:55,380 --> 01:56:56,600 in Oregon State University, 1356 01:56:57,020 --> 01:56:59,020 and that this figure on the right is not a forecast, 1357 01:56:59,460 --> 01:57:01,980 it's just an overlay of historical outcomes 1358 01:57:01,980 --> 01:57:04,080 and current year's initial conditions. 1359 01:57:05,240 --> 01:57:08,520 CW-3E took prisons monthly observed precipitation grid 1360 01:57:08,520 --> 01:57:09,920 as it is initial condition, 1361 01:57:10,540 --> 01:57:12,040 and then applied historical outcomes 1362 01:57:12,040 --> 01:57:13,840 for the remainder of the water year 1363 01:57:13,840 --> 01:57:16,920 to determine a likelihood of reaching average conditions. 1364 01:57:17,960 --> 01:57:24,680 Red indicates less than a 30% chance of historical outcomes will reach or exceed that average condition. 1365 01:57:25,120 --> 01:57:29,940 Green means that 50% of historical outcomes will reach that average condition. 1366 01:57:30,720 --> 01:57:33,740 And dark blue means either that average has already been reached, 1367 01:57:34,280 --> 01:57:38,260 or that all historical outcomes would result in average conditions. 1368 01:57:39,820 --> 01:57:44,880 That's what we have in store for us for the remainder of the winter. 1369 01:57:47,480 --> 01:57:49,640 Looking ahead in next month, as I mentioned before, 1370 01:57:49,640 --> 01:57:56,280 will look forward to hearing from Dave Wilden and his group on the Storm Damage emergency rehab program, 1371 01:57:56,760 --> 01:58:04,160 some raising that work, and I'm happy to entertain any questions before I introduce the next speaker. 1372 01:58:10,660 --> 01:58:13,780 You mentioned the reservoir storage. 1373 01:58:15,420 --> 01:58:20,340 I thought the oreville was quite a bit below its conservation storage. 1374 01:58:20,740 --> 01:58:21,860 Am I wrong about that? 1375 01:58:21,900 --> 01:58:22,060 Nope. 1376 01:58:22,220 --> 01:58:23,100 You are right, Joe. 1377 01:58:23,660 --> 01:58:24,420 What's up? 1378 01:58:24,420 --> 01:58:24,640 What's up? 1379 01:58:24,640 --> 01:58:24,800 What's up? 1380 01:58:25,880 --> 01:58:26,480 What's up? 1381 01:58:28,800 --> 01:58:30,040 What's up? 1382 01:58:30,040 --> 01:58:32,740 within enhanced flood control pool this winter. 1383 01:58:33,220 --> 01:58:35,620 And so, as expected, 1384 01:58:38,470 --> 01:58:41,430 they're gonna be running, probably be a little lower 1385 01:58:41,430 --> 01:58:44,690 during the beginning of the winter than they historically would. 1386 01:58:44,970 --> 01:58:46,830 Is there safety concerns still, 1387 01:58:47,070 --> 01:58:48,770 or what's causing that? 1388 01:58:49,010 --> 01:58:50,890 Nothing, nothing new this year. 1389 01:58:51,290 --> 01:58:54,650 They ran with an enhanced flood control pool last year as well. 1390 01:58:55,090 --> 01:58:57,590 Well, you say enhanced flood control pool, 1391 01:58:57,590 --> 01:59:01,610 That means reduced conservation storage. 1392 01:59:02,750 --> 01:59:06,690 So I'm just, you know, is this going to be a permanent thing 1393 01:59:06,690 --> 01:59:08,370 or what's going on here? 1394 01:59:09,350 --> 01:59:13,290 I'm really hesitant to speak on behalf of how 1395 01:59:13,290 --> 01:59:16,210 the operating or a reservoir, but Mr. Conchman, 1396 01:59:16,430 --> 01:59:21,950 but for a week and a, okay, it seems to me, 1397 01:59:22,530 --> 01:59:26,470 it's been a billion dollars fixing or a bill, 1398 01:59:26,470 --> 01:59:35,630 And it's hard to understand why we would be operating it below its capacity, but in the information you have on that, I'd appreciate. 1399 01:59:38,860 --> 01:59:39,920 Okay, anything else? 1400 01:59:40,480 --> 01:59:42,300 Okay, John, let's proceed. 1401 01:59:42,940 --> 01:59:43,920 All right, thank you very much. 1402 01:59:44,220 --> 01:59:45,660 That concludes my remarks. 1403 01:59:46,820 --> 01:59:47,120 Okay. 1404 01:59:47,200 --> 01:59:47,840 I think for the opportunity. 1405 01:59:48,820 --> 01:59:59,900 At this point, we're on item members, we're on item 9B and Wade Wiley and Preston Shopfell has this report. 1406 02:00:00,910 --> 02:00:02,910 For the board, 1407 02:00:16,880 --> 02:00:21,760 Mr. Donovan, I forgot to recognize you, you are also here, part of the team. 1408 02:00:33,440 --> 02:00:36,560 Good morning, President Edgar. Members of the board, I'm President Schoppel. 1409 02:00:37,020 --> 02:00:39,560 Chief of the inspection sector, section at the board. 1410 02:00:42,080 --> 02:00:45,960 Before Wade and Saskia give their results of the annual report, 1411 02:00:46,280 --> 02:00:54,080 wanted to give a high-level, very basic overview of inspections that are completed on the state plan of buck control. 1412 02:00:55,100 --> 02:01:00,880 The question we get asked from time to time is why are there so many different inspections 1413 02:01:00,880 --> 02:01:02,020 than on my levy? 1414 02:01:02,540 --> 02:01:07,480 This question is asked to us by a lot of landowners, maintaining agencies, and sometimes 1415 02:01:07,480 --> 02:01:08,020 our regulators. 1416 02:01:10,440 --> 02:01:15,860 So this is a big overview that's just kind of breakdown in the basics of what's out there, 1417 02:01:15,920 --> 02:01:18,020 who looks at what and why they do it. 1418 02:01:21,940 --> 02:01:23,100 So let's start with what gets inspected. 1419 02:01:24,640 --> 02:01:30,480 And in no particular order, we have levy improvement projects, or levy repair projects. 1420 02:01:31,840 --> 02:01:37,120 Projects such as West Safe and Southport projects, Trilia, ones you all know very well. 1421 02:01:40,080 --> 02:01:43,780 There's those system features that are subject to those operations and maintenance activities, 1422 02:01:44,460 --> 02:01:50,880 mowing things that are the day-to-day activities of the LMAs, includes levy structures, 1423 02:01:50,880 --> 02:01:53,920 which is pump stations and wears and channels. 1424 02:01:55,500 --> 02:01:59,060 This efforts the focus of DABR's annual inspection report. 1425 02:02:01,850 --> 02:02:03,110 And of course encroachments. 1426 02:02:03,510 --> 02:02:04,730 That's permitted or otherwise. 1427 02:02:05,850 --> 02:02:07,890 Anything that's not there for the functioning of the system, 1428 02:02:08,470 --> 02:02:10,330 but have been allowed to remain there by permit. 1429 02:02:13,170 --> 02:02:14,350 And also designated floodways. 1430 02:02:14,790 --> 02:02:16,810 Typically non-levy areas within our jurisdiction. 1431 02:02:17,570 --> 02:02:18,370 They're subject to flooding. 1432 02:02:20,160 --> 02:02:29,740 Okay, person on those various breakdowns, the lovey repairs, for example, who does that? 1433 02:02:29,820 --> 02:02:33,420 Is that the core, and DWR, or just the core? 1434 02:02:33,840 --> 02:02:39,160 For inspections, there can be inspectors for the core with the contractor, 1435 02:02:40,460 --> 02:02:46,400 but on the state side, there's a inspector from DWR's division of engineering. 1436 02:02:46,400 --> 02:02:50,420 Okay. And we'll get to the who's coming up. 1437 02:02:54,460 --> 02:02:55,500 All right. 1438 02:02:55,500 --> 02:03:00,180 So why? Let's take a second and think about why we're doing this. 1439 02:03:00,480 --> 02:03:04,040 I mean, I think we'd all agree it's probably a good idea. 1440 02:03:04,260 --> 02:03:07,960 We have 1,600 miles of levees that California has given insurance 1441 02:03:07,960 --> 02:03:11,380 assurances to the federal government that will maintain in accordance with 1442 02:03:11,380 --> 02:03:13,040 those operations and maintenance manuals. 1443 02:03:14,000 --> 02:03:16,020 You add in designated floodways and regulate streams. 1444 02:03:16,020 --> 02:03:18,700 that means there's a lot to keep track about there. 1445 02:03:20,890 --> 02:03:23,230 And I'm not too distant second, it's also the flaw. 1446 02:03:24,490 --> 02:03:28,510 The code of federal regulations title 33, Section 20810, 1447 02:03:28,570 --> 02:03:30,010 that's promulgated through those operations 1448 02:03:30,010 --> 02:03:33,370 and maintenance manuals, that's one of the main 1449 02:03:33,370 --> 02:03:36,770 matters of how we have agreed to maintain 1450 02:03:37,650 --> 02:03:39,370 these levees and SPFC. 1451 02:03:40,930 --> 02:03:42,690 And then state law, of course, there's 1452 02:03:42,690 --> 02:03:44,490 various sections of water code and the California 1453 02:03:44,490 --> 02:03:45,370 and the code of regulations, 1454 02:03:46,030 --> 02:03:49,150 out of 23 to 21 that were all so familiar with. 1455 02:03:51,610 --> 02:03:54,010 Also it provides a presence that can be a deterrence 1456 02:03:54,010 --> 02:03:55,910 to potentially damaging our legal activities 1457 02:03:55,910 --> 02:03:59,490 as was talked about earlier in the previous presentations. 1458 02:04:01,090 --> 02:04:03,430 And then finally, and most basically, 1459 02:04:03,530 --> 02:04:05,550 it helps identify those possible issues 1460 02:04:05,550 --> 02:04:08,190 unless it's take action before they become emergencies. 1461 02:04:12,600 --> 02:04:15,400 It's all under who inspects, who does this work? 1462 02:04:16,720 --> 02:04:18,040 At the federal level, 1463 02:04:18,680 --> 02:04:26,960 U.S. Army Corps, conducts PL-84-99, continuing eligibility inspections, as well as periodic and routine inspections. 1464 02:04:27,680 --> 02:04:29,140 They do their inspections annually. 1465 02:04:29,680 --> 02:04:35,640 They choose different systems in which to take a look at, and then are reported those, their findings to the state. 1466 02:04:36,920 --> 02:04:41,820 At the local level, those local agencies are constantly monitoring their system while doing maintenance, 1467 02:04:41,820 --> 02:04:46,380 and then reporting the results as required by WaterCode 9141. 1468 02:04:46,940 --> 02:04:49,520 And Sasuke will talk to you more about that coming up. 1469 02:04:54,180 --> 02:04:59,920 And at the state level, we have many inspection programs and efforts to meet our obligations 1470 02:04:59,920 --> 02:05:03,640 to the federal government and to comply with those state laws and regulations. 1471 02:05:04,860 --> 02:05:07,720 Some of these responsibilities are shared between DWR and the board. 1472 02:05:08,860 --> 02:05:15,020 They include encroachment construction inspections handled by our inspection section at the board. 1473 02:05:15,600 --> 02:05:20,420 with the support of DWR, system alteration and project inspections. 1474 02:05:21,220 --> 02:05:25,820 I interchange those with lovely repair projects, the large ones that we all know about. 1475 02:05:26,200 --> 02:05:28,340 That's taken care of by DWR as Division of Engineering. 1476 02:05:30,160 --> 02:05:35,360 Routine encroachments, inspections, permitting, and enforcement are all handled by Board staff. 1477 02:05:40,680 --> 02:05:42,260 And here are the types of inspections that are handling. 1478 02:05:42,260 --> 02:05:51,940 on these inspections that have more than one agency, do they attempt to do it together or 1479 02:05:51,940 --> 02:05:53,500 are they inspecting different things? 1480 02:05:53,960 --> 02:05:59,140 It's usually, it's usually coverage, so maybe not both agencies there at the same time, 1481 02:05:59,780 --> 02:06:02,620 but ensuring that someone is covering that that needed inspection. 1482 02:06:03,220 --> 02:06:08,040 So for instance, I have three inspectors that can't get to every encroachment all the time. 1483 02:06:08,720 --> 02:06:14,040 We partner with Wade's group to make sure there's coverage for construction of an encroachment. 1484 02:06:15,400 --> 02:06:15,420 Right? 1485 02:06:16,040 --> 02:06:16,180 Okay. 1486 02:06:21,120 --> 02:06:21,300 So. 1487 02:06:23,040 --> 02:06:28,420 But it is in the situation where we go out one day and Wade's group goes out another day. 1488 02:06:28,820 --> 02:06:31,240 No, typically if that's the case. 1489 02:06:31,340 --> 02:06:35,620 Wade might be going out for a completely different reason for his annual inspections. 1490 02:06:35,860 --> 02:06:39,740 But we may be looking at a specific pipe that they may seem that's a problem. 1491 02:06:39,740 --> 02:06:50,740 But it's up to us to follow through and with the owner or whoever that is, and they may inform us of what that is if we didn't already see it. 1492 02:06:53,440 --> 02:07:01,320 So I left this table as itself because you can see how much is really performed by the flood projects project inspection and assessment branch. 1493 02:07:01,320 --> 02:07:07,040 These are going to be detailed in the report that Wade and Sasuke are going to provide, but I just 1494 02:07:07,040 --> 02:07:12,160 want to list that to kind of emphasize how much work it is just to observe and report and 1495 02:07:12,160 --> 02:07:18,100 produce that every year so that we can make informed decisions about what to do next. 1496 02:07:20,060 --> 02:07:24,400 Just quickly, there are work includes spring and fall heavy maintenance inspections, channel 1497 02:07:24,400 --> 02:07:29,800 instruction maintenance inspections, the San Joaquin River erosion survey, the utility 1498 02:07:29,800 --> 02:07:32,960 crossing inspection program and levy log updates. 1499 02:07:34,600 --> 02:07:37,940 These efforts are ones that are going on every year, and in this list doesn't include 1500 02:07:37,940 --> 02:07:44,660 those singular efforts like the Uly newly programs that deep dive into one specific 1501 02:07:44,660 --> 02:07:49,260 subject matter, or for instance the levy tree assessment program that kind of have a beginning 1502 02:07:49,260 --> 02:07:53,120 and end and go with the funding that they came with. 1503 02:07:53,140 --> 02:07:55,400 These are ongoing works every year. 1504 02:07:58,410 --> 02:08:09,110 So, seeing that graphically, let's look at an example of a stretch of levee, in just one area we can find a lot of elements that deserve attention and monitoring. 1505 02:08:09,690 --> 02:08:27,110 Up at the top, you've got a potential channel maintenance issue, encroachments like that boat dock, levy operations and maintenance, mowing, vegetation management, tree surveys, the periodic inspections and PLA-499 inspections and by the core. 1506 02:08:27,970 --> 02:08:30,690 This could be an area where there's a living improvement project. 1507 02:08:30,930 --> 02:08:32,590 Maybe there's a cut-off wall that's installed, 1508 02:08:32,870 --> 02:08:36,350 such as in the Sacramento River area. 1509 02:08:39,160 --> 02:08:41,240 And then also there could be enforcement cases, 1510 02:08:41,460 --> 02:08:43,940 not saying that is one, but just as an example. 1511 02:08:50,580 --> 02:08:52,980 So our group are relatively new in humble inspection 1512 02:08:52,980 --> 02:08:56,320 section focuses on our efforts on the following areas. 1513 02:08:57,400 --> 02:09:00,320 The construction of new encroachments and encroachments that 1514 02:09:00,320 --> 02:09:08,700 repair that are beyond their useful design life, we look for continued compliance of existing 1515 02:09:09,620 --> 02:09:14,300 encroachments through our routine inspections and we're constantly updating our records 1516 02:09:14,300 --> 02:09:18,220 and our databases to be smart about what areas need more attention. 1517 02:09:20,080 --> 02:09:25,940 Like I said before, we coordinate these inspection efforts with DWR and the Army Corps, and 1518 02:09:25,940 --> 02:09:37,750 assist with the enforcement cases and, as you know, is to comply to folks in the field and we provide support as requested by our management, real estate branch and environmental branch. 1519 02:09:44,800 --> 02:09:52,280 As you all know, very well, coordination is plays a huge role in maintaining the awareness and efficient of our inspection oversight. 1520 02:09:52,900 --> 02:09:59,820 We're in constant communication with board staff and DWR inspectors to ensure construction activities are adequately monitored. 1521 02:10:01,060 --> 02:10:06,180 And I wanted to talk specifically about this inspection compliance work group. 1522 02:10:06,260 --> 02:10:11,840 President Edgar, you would ask us at the end of the year in the December workshop about how our inspection 1523 02:10:11,840 --> 02:10:16,180 section relates to the efforts of that inspection compliance work group. 1524 02:10:17,280 --> 02:10:19,580 So as I mentioned previously in the presentation, 1525 02:10:20,420 --> 02:10:27,120 we focus on those construction of new encroachments, repair, existing encroachments to make sure things get built. 1526 02:10:27,120 --> 02:10:31,280 according to the 23 standards, the permit conditions, that kind of thing. 1527 02:10:31,600 --> 02:10:33,640 That's a piece of the larger puzzle. 1528 02:10:34,380 --> 02:10:37,340 Just like O&M inspections is a piece of the puzzle, 1529 02:10:37,580 --> 02:10:40,520 just like the system improvement projects are a large piece, 1530 02:10:41,300 --> 02:10:42,560 and those channel maintenance inspections. 1531 02:10:43,200 --> 02:10:44,520 That's all pieces of that. 1532 02:10:46,820 --> 02:10:52,460 A subgroup of that, I see WG as we call it, 1533 02:10:52,460 --> 02:10:54,460 is a data management team. 1534 02:10:54,460 --> 02:11:05,340 And we're currently discussing how to manage all the data that comes from all those inspections at different levels, local reporting, state reporting, federal reporting, 1535 02:11:05,840 --> 02:11:12,740 with the ultimate goal of helping LMAs streamline their reporting to the state and onward to the Army Corps. 1536 02:11:14,640 --> 02:11:21,820 That's for PLD-489, continuing eligibility, the annual SWIFT reports, and state reporting 1537 02:11:21,820 --> 02:11:24,980 requirements, which must dawn of an old detail later. 1538 02:11:27,820 --> 02:11:30,860 As much as much of this type of work, the devil's sort of in the details. 1539 02:11:31,880 --> 02:11:35,340 And so the data is a challenge. 1540 02:11:35,580 --> 02:11:42,620 We need to streamline and efficiently communicate what those bits of data are, so that the 1541 02:11:42,620 --> 02:11:47,800 are going to be receiving from the state. We know receiving from the locals and back and forth. 1542 02:11:51,100 --> 02:11:57,900 So this data management team is currently meeting. We just met yesterday or two days ago. 1543 02:11:58,360 --> 02:12:03,680 We're in the office to, we met this Tuesday, 1544 02:12:06,680 --> 02:12:09,600 and this upcoming money will meeting, 1545 02:12:09,600 --> 02:12:14,680 be meeting in the field to go over some of the tools that Army Corps has, one of their 1546 02:12:14,680 --> 02:12:19,660 new mobile inspection apps, in order to get ideas of how the state and local partners 1547 02:12:19,660 --> 02:12:22,500 can better transmit back into the reporting system. 1548 02:12:23,300 --> 02:12:28,400 So the Corps has been fantastic in letting us know the new system that they're moving to, 1549 02:12:28,600 --> 02:12:35,140 giving us an opportunity to present our challenges with the old way of reporting and having 1550 02:12:35,140 --> 02:12:40,280 going to inspect around the field, it has a book that's three inches wide with reports and 1551 02:12:40,280 --> 02:12:45,380 how to really communicate back correctly the most efficient way. 1552 02:12:48,480 --> 02:12:52,660 So with that, I'll take your questions, but before I do, I just wanted to congratulate Wade 1553 02:12:52,660 --> 02:12:57,840 Wiley on his recent promotion to Chief of DBR's flag project inspection and assessment 1554 02:12:57,840 --> 02:12:58,720 branch. 1555 02:12:59,040 --> 02:12:59,540 There he is. 1556 02:13:00,540 --> 02:13:03,840 It's well deserved and we're looking forward to working with you in your role. 1557 02:13:05,260 --> 02:13:14,220 Question on the work that I've sat in on that inspection, or yeah, inspection compliance 1558 02:13:14,220 --> 02:13:23,960 work group, we looked at ways to try to reduce the time for permitting, because that's 1559 02:13:25,420 --> 02:13:31,460 a concern of the governor right, and it's part of his resiliency plan that he wants 1560 02:13:31,460 --> 02:13:43,320 the promote and it seems to me just for listening to what Ryan Larson was saying and the 1561 02:13:43,320 --> 02:13:49,600 folks from DWR and you were saying that the best we can do on those permits. 1562 02:13:51,500 --> 02:13:58,240 If everything was perfect and you know went through and there weren't any big problems which 1563 02:13:59,140 --> 02:14:08,420 unbelievable, but assuming the best three months is the best the core could do. And then it 1564 02:14:08,420 --> 02:14:13,420 comes over to us and there's another three months. So it looks like to me that if 1565 02:14:13,420 --> 02:14:21,040 you had just a perfect permit that was going through and nothing was it still take you 1566 02:14:21,040 --> 02:14:26,280 because of the statutory requirements and all of this it still take you about six months 1567 02:14:26,280 --> 02:14:28,900 to get a permit. Is that right? 1568 02:14:29,660 --> 02:14:33,500 I defer to Gary Lemon on some of that, but I believe that sounds about right. 1569 02:14:34,140 --> 02:14:42,080 Yeah, okay. So I think the feedback we're getting, I just want to make sure that the 1570 02:14:42,080 --> 02:14:47,800 message is clear to the locals, because the feedback we get is, you know, if I have to 1571 02:14:47,800 --> 02:14:54,060 get a permit from a city or a county, it's the most it'll be 30 days. I have to get one 1572 02:14:54,060 --> 02:14:59,520 from the state, and it's partners, the core, and... 1573 02:15:20,020 --> 02:15:29,980 I don't know how we look into that system, and I know everybody is doing this, but I don't 1574 02:15:29,980 --> 02:15:38,020 best to kind of re-engineer that system, but that still seems like a long time to me. 1575 02:15:38,520 --> 02:15:45,920 But it is what it is, so we will move from there, but at least we have an answer. 1576 02:15:48,420 --> 02:15:54,680 I think that group has got good participation from the core of the core of doing a great 1577 02:15:54,680 --> 02:15:57,160 job and sharing data with us now. 1578 02:15:57,160 --> 02:16:04,440 haven't done that in the past and it's really very helpful and of course DWR is doing a great 1579 02:16:04,440 --> 02:16:05,520 job in helping us. 1580 02:16:07,540 --> 02:16:15,280 That seems to be working well and the database if you can get that new database 1581 02:16:15,280 --> 02:16:21,180 that the core talked about the other last meeting that would be fantastic. 1582 02:16:21,640 --> 02:16:27,840 Right, it looked pretty good, we're still looking at what options there are, and what works 1583 02:16:27,840 --> 02:16:33,300 best for state and locals, you know, but it's a good idea of what the endpoint of where 1584 02:16:33,300 --> 02:16:38,780 that data might end up, so that we can get an efficient way to report it without bogging 1585 02:16:38,780 --> 02:16:41,780 people down with a lot of paperwork. 1586 02:16:41,960 --> 02:16:46,480 A lot of paperwork and thou shalt only use this thing, we want to provide that flexibility 1587 02:16:46,480 --> 02:16:47,000 as well. 1588 02:16:47,000 --> 02:16:57,820 And people like Chris Newdack and Gil-Kazio, they're helping with that group still. 1589 02:16:58,480 --> 02:16:59,780 Chris Newdack for sure. 1590 02:17:01,080 --> 02:17:01,140 Yeah. 1591 02:17:01,140 --> 02:17:01,860 Some of them. 1592 02:17:02,220 --> 02:17:02,640 I mean partners. 1593 02:17:03,980 --> 02:17:05,380 And Barry is there. 1594 02:17:05,580 --> 02:17:06,120 Very, very good. 1595 02:17:08,120 --> 02:17:08,480 All right. 1596 02:17:09,220 --> 02:17:10,020 Thank you. 1597 02:17:10,600 --> 02:17:12,100 Thank you. 1598 02:17:12,140 --> 02:17:12,880 Give it over to Wade. 1599 02:17:15,280 --> 02:17:15,820 Thanks, Preston. 1600 02:17:21,740 --> 02:17:22,220 Good morning. 1601 02:17:22,740 --> 02:17:23,540 President Edgar, ladies. 1602 02:17:23,540 --> 02:17:28,260 and gentlemen of the board. My name, as president, is Wade Wiley and I'm the chief of the 1603 02:17:28,260 --> 02:17:33,300 flood project inspection and assessment branch. Today with the help of Saskia Donovan, 1604 02:17:34,360 --> 02:17:40,180 an engineer with the local maintaining agency reporting section. We will be presenting the 2019 1605 02:17:40,180 --> 02:17:43,080 inspection and local maintaining agency report. 1606 02:17:52,120 --> 02:17:54,500 Today I will be given a brief overview of the contents 1607 02:17:54,500 --> 02:18:00,300 of the report. Then I will highlight some of the differences between this year's summary profiles 1608 02:18:00,300 --> 02:18:06,660 and previous summary profiles, then I'll talk about the 2019 inspection results. 1609 02:18:07,680 --> 02:18:12,840 At that point I'll hand it off to Saskia who will talk about the LMA reporting results. 1610 02:18:14,680 --> 02:18:18,560 And when Saskia is finished with that, I'll provide an update on our programs, 1611 02:18:19,560 --> 02:18:21,220 tools, activities, and achievements. 1612 02:18:22,800 --> 02:18:28,400 Then I'll finish with a discussion of the inspection and assessment branches goals looking forward. 1613 02:18:31,860 --> 02:18:38,620 This year, this year's report combines the results of programs from both DWR and the Army Corps of Engineers. 1614 02:18:39,820 --> 02:18:45,480 Some of the programs included in this report are the utility crossing inspection program, 1615 02:18:46,500 --> 02:18:52,240 the Sacramento River Bank Erosion Survey, DWR's flood system repair project, 1616 02:18:53,040 --> 02:18:55,760 and the Army Corps PL-8499 eligibility. 1617 02:18:57,000 --> 02:19:04,220 together with our inspections, our maintenance inspections, the information provided by these programs, 1618 02:19:04,540 --> 02:19:09,140 helps the inspection determine, inspection section, determine the quality of maintenance, 1619 02:19:09,480 --> 02:19:11,300 the levy maintaining agencies are providing. 1620 02:19:13,470 --> 02:19:15,410 In the report are the maintenance inspection 1621 02:19:15,410 --> 02:19:22,430 results for the levy's, channels, structures, the results of the DWR Samwakeen River erosion 1622 02:19:22,430 --> 02:19:26,110 survey and the LMA annual reporting results. 1623 02:19:27,850 --> 02:19:29,990 New this year are the results from the designated 1624 02:19:29,990 --> 02:19:31,110 floodway inspections. 1625 02:19:32,770 --> 02:19:35,970 And as an previous reports, the flood project inspection 1626 02:19:35,970 --> 02:19:38,150 and assessment branch activities and accomplishments 1627 02:19:38,150 --> 02:19:43,250 are listed as are the LMA summary profiles in Appinix's AVNC. 1628 02:19:47,580 --> 02:19:51,880 The LMA summary profiles in Appinix AVNC provide one location 1629 02:19:51,880 --> 02:19:55,260 for each LMA to review all the data gathered 1630 02:19:55,260 --> 02:20:00,280 from the many programs that contribute to the results of this inspection report. 1631 02:20:01,580 --> 02:20:07,720 This includes data and results from the inspection branch, the flood projects office and the Army Corps of Engineers. 1632 02:20:09,500 --> 02:20:14,580 There are some differences in this year's summary reports when compared to last year's. 1633 02:20:14,720 --> 02:20:20,860 This year there was an update to the erosion inspection from the Army Corps Sacramento River Bank Protection Program. 1634 02:20:20,860 --> 02:20:27,460 The core provided vinyl inspection results from their 2017 inspection, which we were previously 1635 02:20:27,460 --> 02:20:28,440 showing is draft. 1636 02:20:30,140 --> 02:20:35,680 Another item to note is the DWR flood system repair projects points of interest. 1637 02:20:37,020 --> 02:20:41,960 Because of the 2017 storm damage repair efforts that are ongoing, the flood system repair 1638 02:20:41,960 --> 02:20:48,340 project points of interest data was not updated in 2019, so in these reports you'll see 1639 02:20:48,340 --> 02:20:50,540 the 2018 FSRP data shown. 1640 02:20:53,140 --> 02:20:56,900 And when viewing these points on the summary profile maps, 1641 02:20:57,320 --> 02:20:59,580 that there's overlap between the FSRP points 1642 02:20:59,580 --> 02:21:05,700 and the 2017 storm damage, the 2017 storm damage sites 1643 02:21:05,700 --> 02:21:06,260 are shown. 1644 02:21:10,350 --> 02:21:12,490 It's important to note that only storm damage sites 1645 02:21:12,490 --> 02:21:14,830 identified as critical or serious were shown 1646 02:21:14,830 --> 02:21:16,470 in our LMA summary maps. 1647 02:21:17,130 --> 02:21:20,190 Sites rated as area of concern were not shown. 1648 02:21:20,830 --> 02:21:27,190 I would also like to point out that this is the last inspection where the 2017 storm damage 1649 02:21:27,190 --> 02:21:31,950 sites will not be included in the calculation of the LMAs overall rating. 1650 02:21:33,650 --> 02:21:38,150 As the three year grace period that we were providing for repairs has come to an end. 1651 02:21:40,020 --> 02:21:44,740 Starting in spring of 2020 sites that are not repaired and do not have a plan and place 1652 02:21:44,740 --> 02:21:48,640 for repair will again be counted in that overall calculation. 1653 02:21:48,640 --> 02:21:49,560 So 1654 02:21:54,320 --> 02:22:01,000 here we have the overall ratings for the different elements of the flood protection system for 2019. 1655 02:22:01,420 --> 02:22:08,740 The table shows results for the levees, channels, structures, and pumping plants within the state plan of flood control. 1656 02:22:16,340 --> 02:22:22,440 On the, when we look at that previous chart, when we 1657 02:22:26,380 --> 02:22:29,300 say acceptable and linearly acceptable, 1658 02:22:30,560 --> 02:22:35,100 Do we, are those the ones that qualify for PL-84-99? 1659 02:22:35,880 --> 02:22:37,420 These are our state ratings. 1660 02:22:38,240 --> 02:22:38,640 Not the state. 1661 02:22:39,140 --> 02:22:40,920 This is not PL-84-99. 1662 02:22:48,980 --> 02:22:51,580 Looking at just the levian inspection results, 1663 02:22:51,900 --> 02:22:55,140 you can see this year's ratings declined somewhat from last year, 1664 02:22:55,720 --> 02:22:58,360 but they're pretty similar to what we had in 2017. 1665 02:23:00,380 --> 02:23:03,800 We think that this year's decline may have been related to a late spring rainfall 1666 02:23:03,800 --> 02:23:08,840 that contributed to vegetation growth after herbicides were applied by some of the 1667 02:23:08,840 --> 02:23:09,920 LMAs. 1668 02:23:10,820 --> 02:23:18,920 Of the 48 LMAs receiving unacceptable ratings, 29 of them, or 60% have received the same 1669 02:23:18,920 --> 02:23:22,020 unacceptable rating for five years or more. 1670 02:23:23,990 --> 02:23:31,430 Of the 23 LMAs receiving minimally acceptable ratings, 16 of them were rated minimally 1671 02:23:31,430 --> 02:23:35,050 acceptable or better for each of the last five years. 1672 02:23:36,150 --> 02:23:38,850 And many of those same 16 would have received an acceptable rating. 1673 02:23:39,450 --> 02:23:44,250 This year had the inspection not noted one or more unacceptable item in those areas. 1674 02:23:46,660 --> 02:23:52,520 Of the 35 LMAs receiving an acceptable rating, only nine have received the same acceptable 1675 02:23:52,520 --> 02:23:54,520 rating for each of the last five years. 1676 02:23:58,770 --> 02:24:05,190 As of previous years, the most common, maintenance deficiency identified by inspectors 1677 02:24:05,190 --> 02:24:06,870 has to do with vegetation management. 1678 02:24:08,350 --> 02:24:12,710 This year's results show that 19 of the LMAs receiving unacceptable ratings 1679 02:24:13,250 --> 02:24:19,390 could improve to an acceptable rating if their LMAs just performed thorough vegetation management. 1680 02:24:21,760 --> 02:24:24,860 An additional eight of the LMAs receiving unacceptable ratings 1681 02:24:24,860 --> 02:24:30,560 could also improve their current ratings if their LMAs performed a combination of vegetation management 1682 02:24:30,560 --> 02:24:36,320 with efforts in either animal control, erosion maintenance, or crown surface maintenance. 1683 02:24:42,410 --> 02:24:48,950 The 2019 channel inspection results are very similar to last years with only one channel being rated as unacceptable. 1684 02:24:50,630 --> 02:24:56,790 These channels, these 26 channels that we report on, are non-lebbied project channels, 1685 02:24:57,450 --> 02:25:01,890 specifically called out in the water code and the Army Corps O&M manuals. 1686 02:25:01,890 --> 02:25:05,390 our inspectors evaluate the channels at specific locations 1687 02:25:05,890 --> 02:25:09,370 where there are restrictions to the channel like bridges or road crossings. 1688 02:25:11,270 --> 02:25:12,130 Excessive vegetation, 1689 02:25:13,170 --> 02:25:17,250 Sholing, erosion, or other factors that may impact the capacity of the channel, 1690 02:25:17,830 --> 02:25:20,990 are noted and used in the rating analysis for each channel. 1691 02:25:22,530 --> 02:25:26,630 And the main issue driving the channel ratings this year, like the levees, is the vegetation. 1692 02:25:32,730 --> 02:25:36,570 Structure maintenance appears to be pretty consistent for the last five years 1693 02:25:36,570 --> 02:25:39,750 with some fluctuation between minimally acceptable and acceptable. 1694 02:25:41,790 --> 02:25:50,890 And the slight increase you can see between 2016 and 2018 is a result of splitting up various structures that we previously treated as one, 1695 02:25:51,070 --> 02:25:54,010 so it's not like we added any new structures to this report. 1696 02:25:57,970 --> 02:26:07,050 Moving on to pumping plant inspections, the results are pretty similar over the last several years, with 11 rated as acceptable and 2 is minimally acceptable. 1697 02:26:10,820 --> 02:26:14,940 So, new to the report this year are the results of the designated floodway inspection. 1698 02:26:16,280 --> 02:26:24,260 We began a new inspection process in 2018 and we created a baseline inspection for 31 floodways within the central valley. 1699 02:26:25,320 --> 02:26:31,260 Inspectors use readily available aerial imagery to perform floodway inspections from the office. 1700 02:26:32,240 --> 02:26:38,480 They identify encroachments within the floodways that might impact the capacity of the floodway or require a board permit. 1701 02:26:39,780 --> 02:26:45,040 Identified encroachments are delineated and geo-referenced and then documented in the database. 1702 02:26:46,720 --> 02:26:51,480 The 2018 baseline assessment identified nearly 6,700 encroachments. 1703 02:26:52,860 --> 02:26:57,420 And an additional 860 encroachments were identified during our 2019 inspection. 1704 02:26:58,380 --> 02:27:02,900 But we think that those are mostly items that were probably existed before 2019. 1705 02:27:03,100 --> 02:27:05,040 We just had better imagery in 2019. 1706 02:27:05,040 --> 02:27:06,100 So 1707 02:27:09,530 --> 02:27:15,990 the results of the designated floodway inspection indicate that much is being done in the floodways without proper board permits. 1708 02:27:17,290 --> 02:27:20,050 Of the 7,500 encroachments that we identified, 1709 02:27:20,750 --> 02:27:26,730 7,200 of those require permits, but only 13% had permits. 1710 02:27:28,270 --> 02:27:33,450 So nearly 50% of all the encroachments that we identified were a structure of some sort. 1711 02:27:33,450 --> 02:27:40,830 The rest in order of magnitude were crops, utilities, and other items like fences, equipment, and debris piles. 1712 02:27:45,040 --> 02:27:49,380 Bridges were the most, were the encroachment that were the most likely to have a board permit, 1713 02:27:50,360 --> 02:27:52,180 with about a 50% compliance rate. 1714 02:27:53,200 --> 02:27:57,200 All other categories of encroachments had a much lower compliance rate. 1715 02:27:58,380 --> 02:28:03,200 Of the 31 floodways inspected, all had unauthorized encroachments. 1716 02:28:03,940 --> 02:28:11,560 And as a result of our findings and seeing the scale of this issue, we're eager to help find approaches to dealing with it. 1717 02:28:11,820 --> 02:28:15,740 We've shared our findings with Board staff and are ready to assist however we can. 1718 02:28:17,400 --> 02:28:21,960 Are there any questions for me before I turn it over to Saskia, who will be talking about the LMA reporting program? 1719 02:28:21,960 --> 02:28:23,860 Okay, what, 1720 02:28:26,580 --> 02:28:30,920 what has to be done here in terms of compliance? 1721 02:28:32,300 --> 02:28:47,000 Let's assume, for example, of the 80% of the non-compliance structure in the designated floodways. 1722 02:28:48,440 --> 02:28:58,160 Are we at a point where we go out and talk to these people or do we set up some sort of another 1723 02:28:58,160 --> 02:29:00,420 system or how does that work? 1724 02:29:02,100 --> 02:29:08,400 Well, I think what we need to do is have some sort of outreach to public agencies that 1725 02:29:08,400 --> 02:29:13,720 are controlling development in their areas and make sure that they understand the requirements 1726 02:29:13,720 --> 02:29:19,320 to apply for board permits and do more of an educational outreach? 1727 02:29:22,520 --> 02:29:28,500 Well, a lot of these are structures in agricultural zone areas, right? 1728 02:29:32,780 --> 02:29:34,540 I wouldn't be able to speak to that. 1729 02:29:34,660 --> 02:29:38,680 I mean, they're in the floodway that the board is delineated. 1730 02:29:38,960 --> 02:29:39,120 Right. 1731 02:29:39,480 --> 02:29:46,400 I'm thinking whether or not the county would require a permit on a agricultural 1732 02:29:46,400 --> 02:29:53,980 your cultural how building do they do that Jane yes they do all 1733 02:29:53,980 --> 02:29:55,580 That's all structures. 1734 02:29:56,020 --> 02:29:57,400 With some... 1735 02:30:00,240 --> 02:30:14,060 Yes, with some exemption for small structures. So that, and small, pretty small. I was just wondering, you 1736 02:30:14,060 --> 02:30:22,440 don't go the inspections, folks don't go on to see if there was a county building permit or a county requirement. 1737 02:30:22,440 --> 02:30:24,180 Not at this point. 1738 02:30:25,800 --> 02:30:31,260 No, if there's in a local bill's taking care of it. 1739 02:30:31,560 --> 02:30:36,180 So you don't know if there's been a local approval, but not a flood board permit. 1740 02:30:36,540 --> 02:30:37,840 That's something to be investigated. 1741 02:30:38,100 --> 02:30:38,400 Correct. 1742 02:30:38,620 --> 02:30:42,900 We do not know if the local floodplain manager has authorized that development. 1743 02:30:43,240 --> 02:30:52,120 And does this report indicate some more examples than a bridge as to what is identified in 1744 02:30:53,140 --> 02:30:55,280 Are you talking about buildings? 1745 02:30:55,920 --> 02:31:03,120 We're talking about buildings, pole barns, garages, out structures, houses, lots of 1746 02:31:03,120 --> 02:31:03,900 lots of structures. 1747 02:31:04,540 --> 02:31:08,260 But you wouldn't know the date the house was built? 1748 02:31:08,980 --> 02:31:09,020 No. 1749 02:31:10,140 --> 02:31:13,000 And that's why we did the baseline survey. 1750 02:31:13,520 --> 02:31:19,400 And our focus is really trying to capture new, recent activity. 1751 02:31:19,400 --> 02:31:25,880 And I think, you know, working with the board staff and enforcement, if necessary, we would 1752 02:31:25,880 --> 02:31:30,520 be able to identify that sort of activity and highlight that for the board. 1753 02:31:32,260 --> 02:31:33,760 Okay, because I think that matters. 1754 02:31:34,040 --> 02:31:38,080 I don't know about all counties, but in the North there was building permits for not required 1755 02:31:38,080 --> 02:31:40,060 for homes until about World War II. 1756 02:31:40,660 --> 02:31:46,560 So you would have, there's a lot of them understood the train by looking at and built their 1757 02:31:46,560 --> 02:31:54,540 on a null and not a hundred feet before the water level or the river. But it'd be hard to get a 1758 02:31:54,540 --> 02:31:58,920 permit for something that was built without requiring that. But yeah, there are things there's 1759 02:31:58,920 --> 02:32:00,300 some work to do with local government. 1760 02:32:04,720 --> 02:32:07,140 We had, you 1761 02:32:09,190 --> 02:32:13,110 know, in terms of our local committee that's 1762 02:32:13,110 --> 02:32:22,270 looking into local compliance to inspections, we had actually the focus of that group was to 1763 02:32:22,290 --> 02:32:25,290 try and eliminate this, 1764 02:32:27,860 --> 02:32:31,940 try and get everybody into the PL-84-99 program. So it didn't 1765 02:32:31,940 --> 02:32:39,640 focus on all these, you know, the nature of your particular inspection program and all 1766 02:32:39,640 --> 02:32:45,060 the deficiencies. But I'm kind of wondering if we're going out and talking to these 1767 02:32:45,060 --> 02:32:53,500 landowners, they've got a number of deficiencies probably on their property one that they 1768 02:32:53,500 --> 02:33:00,300 don't have a swift, the other is, is the compliance problems of all these different kinds 1769 02:33:00,300 --> 02:33:06,140 of inspections. It seems to me there ought to be a way to talk to the property on a one-time. 1770 02:33:07,840 --> 02:33:12,940 And, you know, and, you know, by the way, we want to fix these things. We want to fix the 1771 02:33:12,940 --> 02:33:20,040 deficiencies in DWR. That's pointing out. We want to, we want to make sure you've got a swift going 1772 02:33:20,040 --> 02:33:24,100 on here, so that we don't lose money at the state level. 1773 02:33:24,680 --> 02:33:27,400 And there may be other things that we're talking about. 1774 02:33:28,180 --> 02:33:33,600 But I think maybe as we get into refining this enforcement 1775 02:33:33,600 --> 02:33:38,760 program, now that we have beginning to really bubble up 1776 02:33:38,760 --> 02:33:43,780 this specific data, we're going to need some sort of a way 1777 02:33:43,780 --> 02:33:47,160 to talk to the owners about all the problems, 1778 02:33:47,160 --> 02:33:50,760 rather than have different meetings on different things. 1779 02:33:51,200 --> 02:33:53,500 I don't know if that's possible or not. 1780 02:33:53,620 --> 02:33:54,680 But how you do that? 1781 02:33:54,920 --> 02:33:55,840 I don't know. 1782 02:33:58,410 --> 02:33:58,610 Joe. 1783 02:34:08,730 --> 02:34:12,830 I'm concerned about the designated floodway issue. 1784 02:34:14,090 --> 02:34:19,870 Do you have some sort of breakdown between San Joaquin Valley 1785 02:34:19,870 --> 02:34:24,310 and Sacramento Valley as far as a designated floodway 1786 02:34:24,310 --> 02:34:25,350 and encroachments? 1787 02:34:26,730 --> 02:34:42,070 We could certainly look at the data and mine it for, you know, as separation of the reason that I bring this up is I'm aware in the San Joaquin, especially in the Tolerary Basin. 1788 02:34:42,670 --> 02:34:48,630 There's like entire county practically in the designated floodway. 1789 02:34:49,830 --> 02:34:53,590 I mean, literally, you know, it's a foot deep in its forever. 1790 02:34:55,930 --> 02:35:08,250 And it seems to me that our board should somehow hand that responsibility off to the county to administer. 1791 02:35:08,530 --> 02:35:16,870 I mean, the designated floodway maps weren't published until the 70s, I believe. 1792 02:35:17,230 --> 02:35:19,290 You know, that's my recollection at least. 1793 02:35:19,990 --> 02:35:27,370 So, there had to be a lot of structures in the 70s that already were in the designated floodways. 1794 02:35:27,410 --> 02:35:35,050 How do we know what's new and what's all certainly the designated floodway program didn't require removal of existing structures? 1795 02:35:38,910 --> 02:35:45,710 So, it's impossible, and might, well, nothing's impossible, I guess, but it's extremely difficult 1796 02:35:45,710 --> 02:35:52,630 to administer a program of that breadth and width that covers like entire counties and 1797 02:35:52,630 --> 02:35:53,990 goes for miles. 1798 02:35:56,590 --> 02:36:01,670 I don't know what your thoughts about that, how would you even start to enforce? 1799 02:36:03,210 --> 02:36:09,670 Well, I think the process and the tool that we developed with the help of Oleg Yakima in 1800 02:36:09,670 --> 02:36:18,010 our branch has really provided us a way to do inspections from the office where previously 1801 02:36:18,430 --> 02:36:22,550 it would have been very difficult to get out there and do that kind of leg work to do inspections 1802 02:36:22,550 --> 02:36:25,090 on all the floodways that we have. 1803 02:36:25,090 --> 02:36:40,050 So the process basically we delineate these items on a map and then we come back and re-inspect them when new imagery is available and it helps us identify new encroachments. 1804 02:36:40,130 --> 02:36:47,030 And I think that's where our focus would be, would be, new new encroachments that we identify active stuff that's happening. 1805 02:36:47,030 --> 02:36:56,050 I think you have to accept that these floodways have been developed in places to some extent. 1806 02:36:57,090 --> 02:37:06,130 And I don't have an answer for what you would want to do with all the encroachments that 70, 200 or so that we've identified, 1807 02:37:07,490 --> 02:37:16,810 but certainly moving forward, I think education where we can would be helpful in making sure that our development 1808 02:37:16,810 --> 02:37:23,870 practices aren't impacting the capacity of those floodways, and that somebody at a state 1809 02:37:23,870 --> 02:37:27,590 level is monitoring how locals are managing their floodways. 1810 02:37:28,690 --> 02:37:36,130 I know at one time we were looking into could the FEMA flood map program replace they both 1811 02:37:36,130 --> 02:37:44,730 had the hundred-year floodplain criteria if we could just say, 1812 02:37:44,810 --> 02:37:49,290 let's adopt FEMA's flood maps and let the counties administer it. 1813 02:37:49,590 --> 02:37:56,730 I just don't see how this is such a wide breadth how we should be trying 1814 02:37:56,730 --> 02:38:00,330 to administer this land use in these huge areas. 1815 02:38:00,330 --> 02:38:09,230 I mean, that's a, you know, personal opinion, but to the extent that we could rely more on the counties, 1816 02:38:09,930 --> 02:38:13,570 we should definitely try to go in that direction, I think. 1817 02:38:14,610 --> 02:38:21,550 Just give that responsibility to the floodplain manager of the county of the city and let him deal with it. 1818 02:38:21,550 --> 02:38:24,290 They deal with it anyway. I would think. 1819 02:38:27,650 --> 02:38:28,870 Okay. Tim. 1820 02:38:33,040 --> 02:38:39,200 Thanks. As a reminder, let me ask the first question, which appendix is the designated floodway 1821 02:38:39,200 --> 02:38:42,660 in the report, because I can't find it. Do you know, I'll top your head? 1822 02:38:42,700 --> 02:38:44,520 Only included a high level. 1823 02:38:45,720 --> 02:38:51,180 Okay. Summary of the data behind what's in the body of the report. 1824 02:38:51,360 --> 02:38:54,720 Okay, so that helps. So it's not there. So that can't find. It's just not in the report. 1825 02:38:55,480 --> 02:38:59,480 Okay. Well, I think that I feel a little better about my ability to find information in the report. 1826 02:38:59,480 --> 02:39:00,600 So thanks for that. 1827 02:39:02,320 --> 02:39:05,700 As a reminder for us, we asked for this. 1828 02:39:06,340 --> 02:39:08,780 So this is not something that should be surprised to anybody. 1829 02:39:09,660 --> 02:39:11,180 And this surprised me at all, the numbers don't. 1830 02:39:12,600 --> 02:39:14,040 And I'm glad you guys did it. 1831 02:39:14,180 --> 02:39:18,640 And I know it was done efficiently, not from the field. 1832 02:39:19,980 --> 02:39:21,960 And I recall from the flowway program. 1833 02:39:23,020 --> 02:39:24,380 I think this is probably pretty obvious. 1834 02:39:24,500 --> 02:39:26,240 But the lines are based on topography. 1835 02:39:26,240 --> 02:39:35,640 they were drawn 50 years ago, and it's, but in the end, it's right now our responsibility. 1836 02:39:36,920 --> 02:39:42,940 So now we have even more information about what a colossal volume of work it might be to try to jump into it. 1837 02:39:44,220 --> 02:39:45,500 So we're not going to solve that problem today. 1838 02:39:45,660 --> 02:39:52,240 I think it's worth a discussion offline somehow for us to peel this back a little bit and figure out what to do now. 1839 02:39:53,720 --> 02:40:00,300 I know from a couple of specific examples and I'm aware of like these are they're not old and they're not piles. 1840 02:40:00,680 --> 02:40:06,280 Some of these are homes. Some of them are new and some of them are right next to the river. 1841 02:40:08,120 --> 02:40:11,520 And I think in some cases the city and counties know full well that they're there. 1842 02:40:13,400 --> 02:40:18,320 So this is not obviously something that's going to be worked out in the near future, but I think it's important to start. 1843 02:40:18,320 --> 02:40:20,220 you guys gave us a starting point, which is great. 1844 02:40:20,380 --> 02:40:21,780 So I appreciate that, thank you. 1845 02:40:21,820 --> 02:40:23,580 But I think we need to sit down and figure out 1846 02:40:23,580 --> 02:40:26,300 what we do with it and how we move forward. 1847 02:40:27,060 --> 02:40:30,060 And prioritize whatever it is, our actions are, 1848 02:40:30,120 --> 02:40:32,340 whether we're taking some kind of action to follow up, 1849 02:40:32,460 --> 02:40:34,680 or we're going to follow up with local governments 1850 02:40:34,680 --> 02:40:37,160 and ask them to help do that, or both. 1851 02:40:38,080 --> 02:40:41,500 So let's do that, and probably not do it today. 1852 02:40:42,200 --> 02:40:44,260 But I'm really grateful that you guys were able to pull this 1853 02:40:44,260 --> 02:40:47,100 together, because I think it's been a long time coming. 1854 02:40:47,100 --> 02:40:50,700 Whether we know or not, it's our responsibility right now. 1855 02:40:51,580 --> 02:40:53,820 So, I did want to point out also just as a reminder 1856 02:40:53,820 --> 02:40:57,340 because Bill asked about the POV 499 program. 1857 02:40:57,900 --> 02:40:59,740 And I know this is related to the information 1858 02:40:59,740 --> 02:41:01,040 you've got to present in the report. 1859 02:41:01,800 --> 02:41:04,560 But in our staff report, you'll see our little chart 1860 02:41:04,560 --> 02:41:05,360 in there again. 1861 02:41:05,900 --> 02:41:09,020 And just so folks know that there's always more to be done. 1862 02:41:10,540 --> 02:41:12,640 Over half of the systems and half of the miles 1863 02:41:13,200 --> 02:41:15,160 that are in that program are still not, 1864 02:41:15,200 --> 02:41:16,140 they're inactive. 1865 02:41:17,100 --> 02:41:20,940 You know, and a good 100,000 people plus are also in areas that are inactive. 1866 02:41:22,160 --> 02:41:30,400 So we have the swifts and they've provided a buffer of safety in some cases, not safety, but a buffer for help from the federal government if things go crazy. 1867 02:41:31,280 --> 02:41:36,280 But we're exposing a lot of areas besides the ones that are flagged here in the floodways already. 1868 02:41:37,040 --> 02:41:39,960 And we need to think about how we track that as well. 1869 02:41:40,120 --> 02:41:44,560 Our staff are tracking it, but we need to figure out what we're going to do about it based on the coercive inspections. 1870 02:41:45,680 --> 02:41:50,680 So, because that's still a big, and they're in red, so jumps out of me every month, but it's 1871 02:41:50,680 --> 02:41:52,760 not a report every month, just as a reminder. 1872 02:41:53,880 --> 02:41:55,120 Thank you guys for pulling this together. 1873 02:41:55,620 --> 02:41:57,640 Appreciate it. 1874 02:41:58,060 --> 02:41:58,420 Clyde. 1875 02:41:59,720 --> 02:42:00,340 Thank you. 1876 02:42:03,060 --> 02:42:09,200 Well, here we are again, looking at things, you know, we've all been together here for eight 1877 02:42:09,200 --> 02:42:18,660 And according to my numbers looking at this, it's, we've got 28, I think, 1878 02:42:18,740 --> 02:42:26,620 weights at 29, LMAs have been deemed unacceptable in their maintenance for five years. 1879 02:42:27,320 --> 02:42:30,000 And it's 15 for 13 years. Straight. 1880 02:42:32,360 --> 02:42:34,780 It's not exactly a great record. 1881 02:42:35,840 --> 02:42:38,240 We've done some things to try to deal with this. 1882 02:42:38,580 --> 02:42:40,920 We had established a committee, a deal in Jane, 1883 02:42:41,000 --> 02:42:44,300 to go out and talk to some of these deficient LMAs. 1884 02:42:44,960 --> 02:42:47,740 The Department has established the F map program 1885 02:42:47,740 --> 02:42:53,120 to give the LMAs some funding to try to get into swifts 1886 02:42:53,800 --> 02:42:58,120 and to start looking at prop to 18 revisions, 1887 02:42:58,600 --> 02:43:00,420 and then also some additional funding. 1888 02:43:00,940 --> 02:43:04,580 We've got the SSJDD assessment study going along. 1889 02:43:05,760 --> 02:43:10,040 I mentioned two years before we have RD-1602, which is down by Patterson, 1890 02:43:10,680 --> 02:43:13,320 they came before the board in 2014. 1891 02:43:14,780 --> 02:43:18,340 And basically, we're asking, is there a way we can get out of this system? 1892 02:43:19,700 --> 02:43:23,560 RD-1602 does not have a board of directors, they do not collect an assessment, 1893 02:43:23,720 --> 02:43:25,980 and they do no work. 1894 02:43:26,620 --> 02:43:30,100 the local landowners do whatever work is going to be done. 1895 02:43:30,720 --> 02:43:37,380 And then we had the horseshoe levy problem that we got the letter for last week. 1896 02:43:38,240 --> 02:43:41,860 And at the Coordinating Committee, we have Madera County come into a presentation 1897 02:43:42,780 --> 02:43:50,980 of their conflicts really between looking at the groundwater law and looking at what we are asking them 1898 02:43:50,980 --> 02:43:55,480 and giving us information on what their landowners think they did some surveys. 1899 02:43:55,480 --> 02:44:01,680 They were going to try to go out with a prop to 18 and just kind of went, it didn't 1900 02:44:01,680 --> 02:44:04,380 got a pass, so let's just not go do that. 1901 02:44:06,180 --> 02:44:12,860 I think, you know, we've been here for eight years, and I also did one other thing. 1902 02:44:13,240 --> 02:44:16,180 I looked, I looked to see if I can find this. 1903 02:44:16,180 --> 02:44:28,790 I look to see from Wade's information about how have agencies improved or not improved across 1904 02:44:28,790 --> 02:44:31,970 the time in his chart, which is a five-year chart. 1905 02:44:32,910 --> 02:44:35,690 And I thought it would have been improved some. 1906 02:44:35,870 --> 02:44:45,150 It has 14 of those agencies have improved from that one-in five years later, but 18 of them have gone down. 1907 02:44:46,410 --> 02:44:55,430 And I kind of think it's time we kind of stepped into this, figured out what we're going to do and go do it. 1908 02:44:56,530 --> 02:44:59,950 PG&E had this problem, and we have this problem. 1909 02:45:00,000 --> 02:45:03,040 Problem. And I think, you know, it's time. 1910 02:45:04,740 --> 02:45:10,500 Yeah, I agree with that. And I think there's some things that will, I guess, lead to all, after 1911 02:45:10,500 --> 02:45:14,300 Wades finish, but Jane, you want to comment? 1912 02:45:15,380 --> 02:45:20,900 I would. These annual reports and presentations are obviously very, so 1913 02:45:21,980 --> 02:45:28,340 and troubling and present to us an ongoing challenge to figure out what to do. 1914 02:45:28,700 --> 02:45:33,040 But to suggest that we just hear this report once a year and don't do anything, 1915 02:45:34,040 --> 02:45:35,940 is it's one of our reminds of all we are. 1916 02:45:36,820 --> 02:45:41,900 We have many of these elements that have presented the letters of intent 1917 02:45:41,900 --> 02:45:44,000 that are moving toward a swift. 1918 02:45:45,840 --> 02:45:56,480 I would say the ones that are unacceptable are ones that up until there was active and intensive inspections were just left alone. 1919 02:45:57,060 --> 02:46:03,260 So if you have 20, 30 years of backlog, it's going to take you more than 12 months to correct. 1920 02:46:03,260 --> 02:46:13,980 And the rural entities, and Madera was certainly an example yesterday at Cordon, or Wednesday at Cordonating Committee, that they are working on what to do. 1921 02:46:14,320 --> 02:46:21,640 And they have identified that the number one issue is funding for any number of years. 1922 02:46:22,200 --> 02:46:28,140 Let's pick 1978 when Prop 13 limited local government funding. 1923 02:46:28,140 --> 02:46:30,560 and then whatever year to 18 came along and said, 1924 02:46:30,800 --> 02:46:32,640 you can't do it until you go to the election, 1925 02:46:34,040 --> 02:46:37,880 and can't take away the authority to leave assessments. 1926 02:46:38,920 --> 02:46:40,960 It's made it even even more challenging. 1927 02:46:41,900 --> 02:46:43,720 But they are moving toward that. 1928 02:46:43,740 --> 02:46:45,920 So it's not like we've got to decide to do something. 1929 02:46:46,280 --> 02:46:49,140 We have decided, and Bill and I are the ad hoc community 1930 02:46:49,140 --> 02:46:50,500 to meet with these local groups. 1931 02:46:50,860 --> 02:46:51,520 And some are urban. 1932 02:46:51,980 --> 02:46:53,500 Most are rural. 1933 02:46:54,240 --> 02:46:57,060 Some have functioning boards, some do not. 1934 02:46:57,060 --> 02:47:04,360 Someone out, someone money from the state, they all have a sort of ideas, but they're moving forward. 1935 02:47:04,500 --> 02:47:11,880 They're not stuck in doing nothing, and I appreciate the data that we have now, and you've got 1936 02:47:11,880 --> 02:47:18,500 identified encroachments. Some are bridges, and we know some are structures, but we don't know exactly where. 1937 02:47:18,500 --> 02:47:48,480 So, now we have that data from inspection, but I think that we then move to classifying them by location, risk, history, what's got a local permit, but doesn't have our permit, you know, a sort of review, analyze, maybe the designated floodway maps need to be adjusted, wider, not so wide. 1938 02:47:48,480 --> 02:47:50,580 we wouldn't be in a designated bloodway. 1939 02:47:51,000 --> 02:47:52,540 We're just in a high risk area. 1940 02:47:53,440 --> 02:47:55,660 That's got a whole different kind of classification. 1941 02:47:55,960 --> 02:47:58,540 And then begin to meet with the land use authority, 1942 02:47:59,220 --> 02:48:01,600 which is not the state government or any state entity. 1943 02:48:02,660 --> 02:48:05,200 Even though there's a lot of people that would like that to be done, 1944 02:48:05,640 --> 02:48:07,920 if you pretty complicated to take that away, 1945 02:48:08,060 --> 02:48:09,400 it wouldn't be quick. 1946 02:48:09,720 --> 02:48:10,720 But we have some tools. 1947 02:48:11,460 --> 02:48:14,980 The flood board, and it's we delegate it to our staff, 1948 02:48:15,240 --> 02:48:17,660 review counties general plans, particularly 1949 02:48:17,660 --> 02:48:24,540 their safety element and if they don't have requirements of keeping encroachments that block 1950 02:48:24,540 --> 02:48:30,860 or affect the function of a floodway in their general plan, they would tell them to do that. 1951 02:48:31,580 --> 02:48:37,540 And there are ways that we can encourage them, but you know, my first year is on the board. 1952 02:48:37,860 --> 02:48:39,160 All of our first year is on the board. 1953 02:48:39,460 --> 02:48:47,640 We struggled a lot and put some public money into removing a swimming pool that was in a 1954 02:48:47,640 --> 02:48:50,020 And it was in a place that shouldn't be. 1955 02:48:51,180 --> 02:48:54,020 So it's, you can, you got done. 1956 02:48:54,200 --> 02:48:55,440 And what do you come in after us for? 1957 02:48:55,560 --> 02:48:56,560 We got our building permit. 1958 02:48:56,740 --> 02:48:58,040 We've been all the rest of that. 1959 02:48:58,280 --> 02:49:01,040 So it's, we are making some effort. 1960 02:49:01,420 --> 02:49:06,980 But to think that we can turn this around in even eight years, 1961 02:49:07,040 --> 02:49:10,300 I think, is a good challenge. 1962 02:49:10,680 --> 02:49:12,640 But we continue to work on it. 1963 02:49:13,240 --> 02:49:15,080 And these conversations with the local agencies 1964 02:49:15,080 --> 02:49:21,700 are incredibly enlightening and it does come down to knowing what they need to do and that's 1965 02:49:21,700 --> 02:49:28,360 what the inspection tells them, knowing what they're capable of doing and finding a way to 1966 02:49:28,360 --> 02:49:34,760 fund it. You can't just ride the letter and I'll get it done. But the letter starts and this 1967 02:49:34,760 --> 02:49:45,870 information begins so I think it's good. It helps us to continue to do the work that we've 1968 02:49:45,870 --> 02:49:53,790 following up on these. But what I'm the feedback I'm getting from the people that are out in 1969 02:49:53,790 --> 02:50:02,190 the field, the consulting engineers, who basically are supporting us in terms of the PL-8499 1970 02:50:02,190 --> 02:50:15,850 issue when that comes up. They're supporting, they're trying to get the swifts, trying to get 1971 02:50:15,850 --> 02:50:22,570 faced with and they've told, they've told all their clients that the floodboards coming 1972 02:50:22,570 --> 02:50:27,370 say you better be ready for this and you better sign the swift letter and they'll give you 1973 02:50:27,370 --> 02:50:33,870 some money for it and you need to have a plan and we call it a swift, you can call it a monkey 1974 02:50:33,870 --> 02:50:40,310 renter or whatever but the fact of the matter is you need a plan. Now the chorus said that it 1975 02:50:40,310 --> 02:50:46,870 I was with reasonable, you know, we can't get it done in 10 years or 15 years, they don't care. 1976 02:50:47,110 --> 02:50:52,590 As long as you have a plant to get some of these things done, and that's what they've been selling it. 1977 02:50:52,830 --> 02:50:53,510 But lately, 1978 02:50:56,370 --> 02:51:08,810 what these folks are, at least what the engineers are telling us, in light of these other things that we talked about this morning, all of these rules and regulations. 1979 02:51:08,810 --> 02:51:14,970 and dip from different programs that the state has, whether it's sigma, whether it's 1980 02:51:16,330 --> 02:51:23,850 fish and wildlife, or whatever, they have to choose because they don't have a lot of 1981 02:51:23,850 --> 02:51:38,750 money. So what they're saying is that the flood board never enforces anything that don't 1982 02:51:38,750 --> 02:51:47,670 The sigma regulations that are groundwater regulations that are now coming up and are facing, they're facing. 1983 02:51:48,810 --> 02:51:59,290 So I think at this point we've got two things that I think we need a recommendations from the staff on. 1984 02:51:59,290 --> 02:52:12,750 The way the enforcement works on the repeat offenders, so to speak, is that DWR has to do a report. 1985 02:52:13,430 --> 02:52:19,010 And it's not a little report, but it's according to Mike Mizorah. 1986 02:52:19,790 --> 02:52:27,130 It's a lengthy report, a lot of documentation, a lot of analysis and so on as to go into this report. 1987 02:52:27,130 --> 02:52:39,810 And the Department has to give us a recommendation that this particular LMA has not completed. 1988 02:52:40,150 --> 02:52:43,570 There has not passed an inspection in 20 years. 1989 02:52:44,850 --> 02:52:53,790 And we proposed that the Ford start a maintenance area in that area in order to get the job done. 1990 02:52:53,790 --> 02:53:02,910 There has to be one or two of those so that we can, so the engineers have a little data 1991 02:53:02,910 --> 02:53:09,410 that they can tell their clients and you got to do this swift, you got to have a plan, blah, blah, blah, 1992 02:53:09,970 --> 02:53:11,880 and the state's willing to help out a little bit. 1993 02:53:12,990 --> 02:53:14,230 But we got to perform. 1994 02:53:15,390 --> 02:53:21,430 So I think, as far as the repeat offenders, I think we ought to get with 1995 02:53:25,620 --> 02:53:27,260 who's the fellow 1996 02:53:27,260 --> 02:53:30,840 that the heads up the maintenance are clasped. 1997 02:53:31,160 --> 02:53:31,680 Yeah, more clasped. 1998 02:53:31,800 --> 02:53:35,560 We've got to get with Mark and we've got to look at this data 1999 02:53:35,560 --> 02:53:41,720 and we've got to recommend one or two areas in which 2000 02:53:41,720 --> 02:53:47,460 have not been complied with for 20 years, 15 years, 2001 02:53:48,040 --> 02:53:54,640 and that would be good examples, you know, not one of these examples 2002 02:53:54,640 --> 02:54:02,360 where they don't have a board. It never meets or whatever. We need a good example of 2003 02:54:03,040 --> 02:54:10,220 LMA that is not complied in 15 or 20 years and we need to do a state being necessary. One 2004 02:54:10,220 --> 02:54:18,220 or two examples for the staff based on that and we've got to be some of that in order to support 2005 02:54:18,220 --> 02:54:23,400 what the engineers are telling their clients. We need to do that or they're just going to blow 2006 02:54:23,400 --> 02:54:30,800 off, and like they have been. Now, and in the meantime, Jane and I will continue to meet with 2007 02:54:30,800 --> 02:54:36,180 people that are willing to work with us and see if we can help and gain compliance, and that's 2008 02:54:36,180 --> 02:54:42,560 the idea is to gain compliance in these areas. In the second area that we talked about, or the 2009 02:54:45,680 --> 02:55:06,480 We've got to take what Joe talked about today and Tim and come back with a recommendation on what we ought to be doing, whether we ought to have our committee meet with the land use agency, people, the floodplain managers and the cities and the counties. 2010 02:55:06,480 --> 02:55:10,140 And we say, you know, this is, this is crazy. 2011 02:55:10,440 --> 02:55:13,960 We can't do this kind of, we can't do compliance. 2012 02:55:14,300 --> 02:55:16,360 And this designated from it was, they're making a sense. 2013 02:55:16,360 --> 02:55:18,280 And we want to delegate that responsibility 2014 02:55:19,080 --> 02:55:21,240 to the, to the cities or the, the floodplain 2015 02:55:21,240 --> 02:55:25,060 managers in the city or the county, or something, 2016 02:55:25,500 --> 02:55:26,680 whatever recommendation. 2017 02:55:26,980 --> 02:55:31,280 But those are the two areas that I hear coming out of here 2018 02:55:31,280 --> 02:55:33,840 that we need to recommendations on. 2019 02:55:33,840 --> 02:55:41,120 one or two repeat offenders and what we're going to do on this designated floodway program and 2020 02:55:41,120 --> 02:55:46,380 please don't come back and say we're going to hire 100 people to go out and enforce the 2021 02:55:46,380 --> 02:55:53,890 designated floodway program. I ain't going to work either. So yeah, that'll just blow everything up. 2022 02:55:56,080 --> 02:56:02,660 So anyway, we've got to, I think we've got to start doing our job here. Our job is to enforce 2023 02:56:02,660 --> 02:56:09,700 compliance. The two things is issue permits and enforce compliance. That's our core responsibility. 2024 02:56:10,480 --> 02:56:13,300 Or not doing it. So we gotta do it. Clients right. 2025 02:56:14,560 --> 02:56:22,160 Well, so it's so's Jane. I don't think it's start doing our job. I think it's to continue and to enhance our job. 2026 02:56:22,340 --> 02:56:25,440 Well, yeah, but we gotta we gotta mean what we say. 2027 02:56:25,440 --> 02:56:29,500 Yeah, it's easy to be hard on nobody's doing anything. 2028 02:56:29,680 --> 02:56:38,780 The semi-local agencies are doing nothing because they functionally don't exist, but many of them are struggling with the same things that we're struggling with. 2029 02:56:38,900 --> 02:56:40,700 But yeah, some of them are not doing anything. 2030 02:56:40,740 --> 02:56:41,760 I said that. 2031 02:56:41,780 --> 02:56:42,940 Some of them are doing nothing. 2032 02:56:42,940 --> 02:56:44,720 But we've got to demonstrate that. 2033 02:56:45,000 --> 02:56:46,200 There's a price to pay for that. 2034 02:56:46,540 --> 02:56:47,840 So we need to enhance that. 2035 02:56:48,200 --> 02:56:50,640 So it's kind of like the first enforcement we did. 2036 02:56:51,060 --> 02:56:52,020 And never going in force. 2037 02:56:52,220 --> 02:56:52,920 And so we did something. 2038 02:56:53,100 --> 02:56:54,660 It was like, oh, wow, they're serious. 2039 02:56:54,660 --> 02:56:58,240 Yes, that's right. That's right. Yeah, that's all. So where do we start? 2040 02:56:58,560 --> 02:57:01,980 And we don't start with the pole barn. That protects a goat. 2041 02:57:03,740 --> 02:57:09,000 Well, I don't know. We start with the subdivision. Where we start with home buildings. 2042 02:57:09,400 --> 02:57:14,020 I don't think they're done with the presentation yet. No, I know. I know the art. Okay. 2043 02:57:14,180 --> 02:57:20,180 We're like to test those ourselves. Okay. Okay. Thank you for handling that. 2044 02:57:21,060 --> 02:57:23,860 The rest of your presentation, let's go ahead with it. All right. 2045 02:57:25,700 --> 02:57:26,380 Thank 2046 02:57:33,330 --> 02:57:34,370 you, Wade. 2047 02:57:38,860 --> 02:57:42,860 Good afternoon, President Edgar, and esteemed members of the board. 2048 02:57:43,500 --> 02:57:49,100 My name is Saskia Donovan. I manage the local maintaining agency reporting program, 2049 02:57:49,700 --> 02:57:55,460 and today I will be giving you a brief update on last year's activities and the results of the program. 2050 02:57:56,300 --> 02:58:00,180 As a reminder, this program is separate from the inspection program. 2051 02:58:00,180 --> 02:58:08,540 Now for quick background, the LMA reporting program was established by Assembly Bill 156 2052 02:58:08,540 --> 02:58:15,680 in 2007 and is codified in World Record sections 9140 and 9141. 2053 02:58:16,700 --> 02:58:22,340 It requires annual reporting on operation and maintenance activity for project 2054 02:58:22,340 --> 02:58:25,700 as well as for certain non-project levees. 2055 02:58:27,320 --> 02:58:31,460 What a code 9140 requires that the LMAs report 2056 02:58:31,460 --> 02:58:35,000 annually to DWR, and 9141, 2057 02:58:35,640 --> 02:58:39,880 requires that we in turn report that information to the board. 2058 02:58:41,300 --> 02:58:45,000 The intent is to obtain information beyond what is observed 2059 02:58:45,000 --> 02:58:46,340 by DWR inspectors. 2060 02:58:47,500 --> 02:58:50,360 We are looking for the local operators perspective 2061 02:58:50,360 --> 02:58:56,940 of their problems with the levees and their priorities for levee maintenance in addition to 2062 02:58:56,940 --> 02:58:58,340 information on costs. 2063 02:59:02,660 --> 02:59:06,860 There are five parts to the information we request from the LMAs. 2064 02:59:07,780 --> 02:59:13,480 In part one, we ask for information that is relevant to the levees condition or performance, 2065 02:59:14,220 --> 02:59:20,400 such as vegetation issues, encroachments, sediment accumulation and borne erosion. 2066 02:59:21,500 --> 02:59:42,000 In part two, we ask for information relevant to Levy Integrity and known conditions that might impair or compromise the level of blood protection provided by the Levy, such as C-Pitch, Boils, Burrowholes, Levy Erosion, Levy Instability, Cracks and Penetration deficiencies. 2067 02:59:44,410 --> 02:59:50,170 In part three, we ask for a summary of maintenance performed during the previous fiscal year. 2068 02:59:51,150 --> 02:59:59,950 This is also the part where in which LMAs have the opportunity to provide responses to DWR instance. 2069 03:00:00,000 --> 03:00:19,920 Section items, which the DWR inspectors see during the next inspection cycle. In Part 4, we ask for a list of maintenance activities planned for the current fiscal year, as well as the estimated cost for operation and maintenance of the levy in the current fiscal year. 2070 03:00:21,140 --> 03:00:33,440 In Part 5, we ask for supporting information and any other readily available information that is in the records of the LMA relevant to the condition or maintenance of the levy. 2071 03:00:33,440 --> 03:00:37,600 Examples are updates to emergency action plans, 2072 03:00:37,900 --> 03:00:42,360 as builds, permits, memoranda of understanding and studies. 2073 03:00:47,900 --> 03:00:51,900 There are 106 geographical levied areas 2074 03:00:51,900 --> 03:00:54,760 that have been identified as required to report. 2075 03:00:55,820 --> 03:01:00,360 And those 106 levied areas are represented by 84 elements. 2076 03:01:01,640 --> 03:01:10,380 of those 106 areas, 94% reported in 2019, or met the minimum requirements. 2077 03:01:11,820 --> 03:01:16,540 We have been defining that as responding to at least one of the five parts. 2078 03:01:17,500 --> 03:01:25,040 However, the bar is going to be raised this year requiring a response to all five parts to be considered compliant. 2079 03:01:26,640 --> 03:01:35,020 Last year's reporting compliance trends in line with the four previous years, when it was between 93 and 95 percent. 2080 03:01:35,400 --> 03:01:42,580 We will strive to keep up this high level of compliance and to improve the quality of reporting over the next several years. 2081 03:01:44,680 --> 03:01:52,700 Last year, we implemented a new online reporting system and a percentage of reports that were received electronically, 2082 03:01:52,700 --> 03:01:58,840 when from 69% in 2018 to 83% last year. 2083 03:01:59,600 --> 03:02:06,640 The remaining 17% of reports were submitted as hard copy, which we then entered into the database ourselves. 2084 03:02:11,260 --> 03:02:22,160 For part 3, 92% of the reports that we received provided a summary of maintenance activities performed during the previous fiscal year. 2085 03:02:22,160 --> 03:02:29,040 The graph shows the major maintenance categories which were similar to the ones reported in 2018. 2086 03:02:30,300 --> 03:02:42,120 As an example, for vegetation in 2019, 82% of the reporting levied areas stated that they performed vegetation control during the previous fiscal year. 2087 03:02:42,720 --> 03:02:48,540 Whereas in 2018, 86% of the areas stated that they performed vegetation control. 2088 03:02:49,620 --> 03:02:57,240 As in previous years, vegetation management was the dominant activity, followed by road and control, 2089 03:02:57,720 --> 03:03:01,680 levee repair, levee crown maintenance and encroachment control. 2090 03:03:06,260 --> 03:03:15,400 For part 4, 91% of the reports that we received provided a list of maintenance activities planned for the current fiscal year. 2091 03:03:15,400 --> 03:03:21,740 Again, as reported in previous years, and as shown in the graph, the major categories 2092 03:03:21,740 --> 03:03:27,440 are vegetation control, road and control, levee crown maintenance and levee repairs. 2093 03:03:29,760 --> 03:03:36,960 As part of our efforts to benefit current repair and flood planning programs, we began providing 2094 03:03:36,960 --> 03:03:42,040 the individual LMA cost for operational maintenance per levee mile. 2095 03:03:42,040 --> 03:03:51,740 In the 2019 part four summaries in appendices A and B, our goal for this year is to also provide 2096 03:03:51,740 --> 03:03:58,000 system-wide budget information in the annual report, such as a cost breakdown by maintenance 2097 03:03:58,000 --> 03:04:02,540 category, basin, and urban versus non-urban areas. 2098 03:04:07,800 --> 03:04:16,340 On August 8th, 2019, we held a workshop at the Flatubration Center and Viscipe to provide training 2099 03:04:16,340 --> 03:04:20,460 on the reporting program and the new LMA reporting system. 2100 03:04:21,380 --> 03:04:27,740 A total of 25 participants representing 50 LMAs or 57 areas 2101 03:04:27,740 --> 03:04:29,040 attended the workshop. 2102 03:04:30,180 --> 03:04:35,320 We held additional workshops with DWR Sutter and Sacramento maintenance yard staff. 2103 03:04:36,640 --> 03:04:42,220 The new reporting system was developed with the collaboration of the California Data Exchange 2104 03:04:42,220 --> 03:04:50,280 center or CDEC and the major improvements include easier access, less time consuming data entry, 2105 03:04:51,100 --> 03:04:56,440 improved user interface and overview of data entries and easier generation of summary 2106 03:04:56,440 --> 03:05:03,420 reports of current and previous data. In addition, the LMAs have the opportunity to submit 2107 03:05:03,420 --> 03:05:11,480 their budgets as an attachment in part 4. We developed a user guide for the new reporting system, 2108 03:05:11,480 --> 03:05:17,320 which is available on CDEC, and also provided in the virtual assistance via phone. 2109 03:05:18,920 --> 03:05:24,180 Like every year, we mail the annual reporting reminder to all LMAs, including instructions 2110 03:05:24,180 --> 03:05:25,720 and hard copy forms. 2111 03:05:26,920 --> 03:05:32,300 We also contacted the LMAs that missed the reporting deadline and reduced the number of 2112 03:05:32,300 --> 03:05:34,740 non-reporters from 18 to 6. 2113 03:05:39,680 --> 03:05:45,400 The annual inspection and local maintaining agency report, as well as in the virtual 2114 03:05:45,400 --> 03:05:52,380 inspection reports are accessible on CDEC. Also, CDs and or hard copies of the 2115 03:05:52,380 --> 03:05:57,380 annual report will be distributed to each LMA and to counties and libraries within 2116 03:05:57,380 --> 03:06:03,980 the LMAs jurisdiction. The raw data from the LMA reporting can be accessed by the 2117 03:06:03,980 --> 03:06:06,260 LMAs through the LMA reporting system. 2118 03:06:12,040 --> 03:06:14,180 The information provided through our program 2119 03:06:14,180 --> 03:06:15,720 has several benefits. 2120 03:06:17,220 --> 03:06:20,460 It provides a local perspective of system performance, 2121 03:06:20,960 --> 03:06:22,680 a knowledge of maintenance challenges 2122 03:06:22,680 --> 03:06:27,060 and management practices that we otherwise would not have. 2123 03:06:28,120 --> 03:06:31,500 Also, the data provide information for flood emergency 2124 03:06:31,500 --> 03:06:34,940 preparedness and system-wide financial information 2125 03:06:34,940 --> 03:06:36,200 for flood planning. 2126 03:06:37,560 --> 03:06:41,520 The issues raised can be informative to allocating future 2127 03:06:41,520 --> 03:06:46,280 level improvement funding, like the flood maintenance assistance program and the flood 2128 03:06:46,280 --> 03:06:53,180 system repair project, and my result in cost share enhancement for certain DWR grants and 2129 03:06:53,180 --> 03:06:54,320 repair programs. 2130 03:06:56,430 --> 03:07:01,030 To fully realize these benefits, we depend on receiving quality information 2131 03:07:01,030 --> 03:07:08,850 from the LMAs. In general, about 85% of the levied areas provide sufficient information 2132 03:07:08,850 --> 03:07:16,070 for all five parts. As mentioned before, we are striving to improve the reporting quality 2133 03:07:16,070 --> 03:07:22,790 of the remaining 15% of reports by providing more feedback and performing more outreach. 2134 03:07:24,750 --> 03:07:31,590 Finally, the LMA reporting system provides LMAs a pathway to water code 9140 compliance 2135 03:07:32,330 --> 03:07:36,590 and provides LMAs with secure management of their inspection data. 2136 03:07:38,090 --> 03:07:40,450 And now I've all turned it back to wait. 2137 03:07:46,290 --> 03:07:50,210 Yeah, that looks, that looks like a good program. 2138 03:07:50,470 --> 03:07:55,910 I'm interested in the interface between your reporting system and 2139 03:07:55,910 --> 03:07:57,550 Wades inspection program. 2140 03:07:58,710 --> 03:08:01,730 When you sit down with these LMAs, is there a 2141 03:08:01,730 --> 03:08:02,790 Discard World Wait a minute? 2142 03:08:02,970 --> 03:08:07,250 You said you did these seven things and the 2143 03:08:07,250 --> 03:08:14,390 inspection found that you're deficient in the same areas of, you know, that are identified 2144 03:08:14,390 --> 03:08:22,070 in your, yeah, right. Do you have those discussions? Is that what happens? Or how does, 2145 03:08:22,070 --> 03:08:28,330 how does the reporting system relate to the inspection system as far as the LMA is concerned? 2146 03:08:29,850 --> 03:08:35,750 Well, as I mentioned before, they have the LMAs, the local maintaining agencies have the 2147 03:08:35,750 --> 03:08:44,250 opportunity to look at their inspection items from the spring inspections, and they can provide 2148 03:08:44,250 --> 03:08:47,690 these boxes to those items. 2149 03:08:48,570 --> 03:08:55,070 For example, they can work in progress or pending or complete corrected. 2150 03:08:56,750 --> 03:09:03,630 So that's the connection and the inspectors see these responses during their next inspection, 2151 03:09:03,630 --> 03:09:12,690 during the fall inspection, so it gives them a heads up and it provides an opportunity for 2152 03:09:12,690 --> 03:09:22,390 the LMAs to check these items off, but the inspectors will still, it gives them a heads 2153 03:09:22,390 --> 03:09:22,510 up. 2154 03:09:22,650 --> 03:09:30,950 They will still go through each of these items and check to see how these items were addressed. 2155 03:09:32,270 --> 03:09:39,530 So, it's just a matter of, it's a form of communication where the LMAs let us know what they have done. 2156 03:09:47,400 --> 03:09:48,120 Thank you, Saskia. 2157 03:09:49,900 --> 03:09:54,260 So, at this time, I'd like to provide an update on our programs, tools, and branch activities. 2158 03:09:55,760 --> 03:09:58,560 The first tool I'd like to talk about is our inspection tool. 2159 03:09:59,580 --> 03:10:02,940 This tool is the workhorse of the inspection sections. 2160 03:10:02,940 --> 03:10:13,680 We use it continually, or we are continually updating its content and functionality, and it is used to collect all inspections performed within the inspection sections. 2161 03:10:14,940 --> 03:10:25,120 This year improvements were made that will allow supervisors and inspectors a way to highlight incidents needing special attention when they're out in the field. 2162 03:10:25,120 --> 03:10:26,080 The 2163 03:10:31,270 --> 03:10:40,830 levee log tool is what we are using to update the long outdated paper copies of the levee logs used to document features along the state plan of flood control levees. 2164 03:10:42,150 --> 03:10:53,050 To accomplish this, the branch created the levee log tool which utilizes the same platform as the inspection tool, but modified it specifically for using collecting features for the levee log update. 2165 03:10:53,970 --> 03:11:07,130 The tool was used successfully to perform the field inspections needed for the update, but the work that we have to do to finalize the levy logs is ongoing because of the very complex nature of the QA review that needs to be done. 2166 03:11:09,340 --> 03:11:17,040 Branch staff work to finalize the field inspections data and have completed what we are now calling phase one of the QA review. 2167 03:11:18,180 --> 03:11:22,920 Based two, which will result in the final version of the levy log, has started. 2168 03:11:23,940 --> 03:11:32,240 The final QA review involves purging of duplicate entries and addition of known permit information to associated encroachments. 2169 03:11:33,640 --> 03:11:42,180 To date, staff have completed approximately 250 miles of levy log updates, and as those levy logs are finalized, we will update them on our website. 2170 03:11:43,400 --> 03:11:48,980 We are prioritizing this effort and are anticipating making significant progress toward completing 2171 03:11:48,980 --> 03:11:50,160 this work here in 2020. 2172 03:11:53,720 --> 03:11:57,440 The LMA reporting tool that Soski was referring to has been redesigned. 2173 03:11:58,340 --> 03:12:04,980 The old version of the tool has been available since 2008 and allowed LMAs access to information 2174 03:12:04,980 --> 03:12:12,120 about their LMAs as well as provided a tool for them to submit their LMA reporting requirements. 2175 03:12:12,980 --> 03:12:15,840 based on feedback over the last few years from users, 2176 03:12:16,560 --> 03:12:17,940 the tool has been redesigned. 2177 03:12:19,700 --> 03:12:22,720 The new tool called the LMA reporting system is now faster 2178 03:12:22,720 --> 03:12:24,960 and more user-friendly than its predecessor. 2179 03:12:26,040 --> 03:12:28,840 The user can update their contact information, 2180 03:12:29,420 --> 03:12:32,580 provide feedback to the inspectors on inspection items, 2181 03:12:33,080 --> 03:12:35,400 and submit their five-part reporting requirements. 2182 03:12:37,600 --> 03:12:40,300 Though not all portions of the previous version are included 2183 03:12:40,300 --> 03:12:45,940 in this redesign, the new system is getting pretty good feedback or positive feedback from 2184 03:12:45,940 --> 03:12:46,760 LMAs. 2185 03:12:47,780 --> 03:12:50,640 And we saw that with the increase in reporting results. 2186 03:12:51,200 --> 03:12:59,050 Are you on your inspection tool is the reporting information also there on our inspection 2187 03:12:59,050 --> 03:12:59,450 tool? 2188 03:12:59,770 --> 03:13:02,930 Like when we go out in the field, the inspection tool is the reporting information there. 2189 03:13:03,610 --> 03:13:03,690 No. 2190 03:13:04,750 --> 03:13:11,690 Well, in part, yes, where they indicate that they have corrected or done something, 2191 03:13:11,690 --> 03:13:18,750 It highlights that item for us when we're out in the field doing the inspection to let us know to 2192 03:13:19,850 --> 03:13:25,510 Look at it, basically, to verify that it was complete. Okay, that's that's where the verification comes in. 2193 03:13:27,590 --> 03:13:34,190 The portions of the previous version that were not in this update are still available for users 2194 03:13:34,850 --> 03:13:40,070 and they will eventually be migrated over to the new LMA reporting tool or reporting system. 2195 03:13:40,070 --> 03:13:46,350 system. So utilizing the previous versions, users can still access the utility crossing inspection 2196 03:13:46,350 --> 03:13:52,670 reports, obtain copies of maps and own immanials, and update board staff with corrections 2197 03:13:52,670 --> 03:13:55,650 they have made to their Army Corps periodic inspections. 2198 03:13:59,330 --> 03:14:00,870 Our efforts to develop street view 2199 03:14:00,870 --> 03:14:06,370 imagery of the state plan of flight control levees continues. Currently, we're collecting 2200 03:14:06,370 --> 03:14:12,370 imagery for state maintained areas, and we'll continue to expand our imagery database 2201 03:14:12,370 --> 03:14:13,910 over the next several years. 2202 03:14:15,330 --> 03:14:19,190 To date, we've collected about 280 miles of street view imagery. 2203 03:14:21,130 --> 03:14:25,690 Unfortunately, at this time, it's only available to the inspection section. 2204 03:14:26,590 --> 03:14:32,890 However, we are looking to make this imagery available to DWR, board, and LMA personnel in the future, 2205 03:14:33,610 --> 03:14:35,530 as funding becomes available for that. 2206 03:14:36,330 --> 03:14:40,210 We are also looking into the use of drone imagery by some 2207 03:14:40,210 --> 03:14:42,510 LMAs to accomplish a similar function. 2208 03:14:43,650 --> 03:14:46,490 How that might be used in conjunction with or instead of 2209 03:14:46,490 --> 03:14:49,410 street view imagery to provide valuable information for 2210 03:14:49,410 --> 03:14:52,130 emergency response, operation and maintenance, 2211 03:14:52,990 --> 03:14:55,230 environmental studies, permitting, and enforcement. 2212 03:15:00,000 --> 03:15:05,780 The utility crossing inventory project continues to evolve, making advancements and how data is shared 2213 03:15:05,780 --> 03:15:10,200 with our partners through upgrades to ferrets and how they operate. 2214 03:15:11,580 --> 03:15:16,180 Starting in 2019, the utility crossing inventory project was renamed the utility crossing 2215 03:15:16,180 --> 03:15:21,860 inspection program. And use of staff has started programmatically inspecting all pipes 2216 03:15:21,860 --> 03:15:27,960 within the system on a five year rotation. Ensuring each year, 20% of the pipes will be visited 2217 03:15:27,960 --> 03:15:30,060 expected and reported on. 2218 03:15:33,500 --> 03:15:39,080 Some additional branch activities I'd like to highlight, we continue to participate in coordination 2219 03:15:39,080 --> 03:15:43,920 meetings with the core, the board, and the LMAs, helping to ensure good communication 2220 03:15:43,920 --> 03:15:45,100 between all agencies. 2221 03:15:47,020 --> 03:15:51,580 Supporting the Flood Operations Center to improve flood response capabilities, branch personnel 2222 03:15:51,580 --> 03:15:55,340 taught flood-fight training courses throughout the state. 2223 03:15:55,340 --> 03:16:01,600 Over the last year, our inspectors helped to teach 19 flood-fight classes, providing training 2224 03:16:01,600 --> 03:16:08,040 to about 750 flood-fighters from LMAs, municipalities, and communities in hazard areas. 2225 03:16:10,160 --> 03:16:14,840 Branch flood-fight specialists were deployed to provide technical assistance to multiple 2226 03:16:14,840 --> 03:16:21,860 events throughout the year, including deployments to Hamilton City, Cash Creek, Kings River, 2227 03:16:22,160 --> 03:16:24,080 and most recently the Stanislaus River. 2228 03:16:25,490 --> 03:16:30,070 Inspectors continue to make great progress on updating permits. 2229 03:16:30,890 --> 03:16:35,510 This year inspectors reviewed and updated or closed over 1,000 permits. 2230 03:16:36,550 --> 03:16:40,150 Their work is ensuring active construction projects are meeting board conditions 2231 03:16:40,150 --> 03:16:46,110 and board databases are updated with accurate locations and information for existing encroachments. 2232 03:16:49,430 --> 03:16:57,010 Looking forward into 2020, we will continue to coordinate and communicate with the many agencies involved with maintaining the levees 2233 03:16:57,010 --> 03:17:01,730 in order to share knowledge between board, core and LMAs 2234 03:17:01,730 --> 03:17:04,870 to help meet the operational and regulatory challenges. 2235 03:17:06,110 --> 03:17:09,770 We will continue to improve the LMA reporting program 2236 03:17:09,770 --> 03:17:11,750 and the quality of the reports. 2237 03:17:13,390 --> 03:17:16,390 We will work to obtain more detailed budget information 2238 03:17:16,390 --> 03:17:20,250 to provide better planning programs or better planning 2239 03:17:23,530 --> 03:17:25,830 to provide better data for planning programs. 2240 03:17:26,530 --> 03:17:29,950 We will advance the update of the web-based 2241 03:17:29,950 --> 03:17:33,010 LMA reporting system and we will continue to 2242 03:17:33,010 --> 03:17:34,910 finalize levy log updates throughout the 2243 03:17:34,910 --> 03:17:35,550 system. 2244 03:17:37,150 --> 03:17:39,650 We plan to continue our efforts to start assessing 2245 03:17:39,650 --> 03:17:43,330 LMA responsible drainage pipes as part of the LMAs 2246 03:17:43,330 --> 03:17:44,050 overall rating. 2247 03:17:46,030 --> 03:17:48,770 As always, we will respond to flood and other 2248 03:17:48,770 --> 03:17:53,400 emergencies as they arise and are requested. 2249 03:17:54,860 --> 03:18:01,240 This concludes our presentation of the 2019 LMAE Agency report, and I want to thank the board 2250 03:18:01,240 --> 03:18:05,920 for this opportunity to share our inspection results and showcase some of our accomplishments. 2251 03:18:06,960 --> 03:18:11,900 I would also like to thank the FBIB Branch staff who worked throughout the year to accomplish 2252 03:18:11,900 --> 03:18:12,700 this good work. 2253 03:18:14,320 --> 03:18:14,920 Thank you. 2254 03:18:17,480 --> 03:18:38,760 Yeah, that's thanks very much Wade that you and Sasuke did a good job and and pressed into there's an awful lot of coordination here, and that's why the database program that you're working on is so important and I hope the LMAs tremendously, I'm sure we've 2255 03:18:38,760 --> 03:18:42,980 So anyway, thanks very much. 2256 03:18:43,120 --> 03:18:45,100 Any board members have any other questions? 2257 03:18:46,980 --> 03:18:48,200 Okay, we have one speaker. 2258 03:18:49,140 --> 03:18:49,780 We're going hard. 2259 03:18:51,200 --> 03:18:51,360 Thank you. 2260 03:18:51,360 --> 03:18:51,800 Thank you, Wade. 2261 03:18:58,310 --> 03:19:00,030 Thank you, President Edgar, members of the board. 2262 03:19:00,030 --> 03:19:02,090 We're going hard on behalf of the Floor Control Association. 2263 03:19:02,410 --> 03:19:03,530 I have two comments I want to make. 2264 03:19:03,870 --> 03:19:07,010 First, I want to thank the Department for generating this information and 2265 03:19:07,010 --> 03:19:10,950 continuing to improve our understanding of the deficiencies with the system and 2266 03:19:10,950 --> 03:19:11,930 the status of the system. 2267 03:19:11,930 --> 03:19:20,710 The first comment is on the decision to list the remaining 2018 unrepaired sites on the districts 2268 03:19:20,710 --> 03:19:22,070 of the LMA reports. 2269 03:19:22,690 --> 03:19:24,050 We don't think that's a reasonable approach. 2270 03:19:24,850 --> 03:19:33,210 As we went through the process of defining what is OMR and our understandings, we reached agreement 2271 03:19:33,210 --> 03:19:38,130 that the type of large capital improvement projects that happen after a flood event is not 2272 03:19:38,130 --> 03:19:39,310 the LMA's responsibility. 2273 03:19:39,950 --> 03:19:47,470 The department has a list of 2017 and 2019 storm damage recites that they intend on repairing. 2274 03:19:48,270 --> 03:19:51,790 The sites haven't been repaired for one or two reasons as I understand it. 2275 03:19:51,970 --> 03:19:54,790 First is the lack of resources and the second is the lack of funding. 2276 03:19:57,070 --> 03:20:01,410 Those two reasons should not be why it gets put on to the LMAs responsibility. 2277 03:20:01,590 --> 03:20:04,330 And our concern is if it starts getting listed on the periodic inspections, 2278 03:20:04,570 --> 03:20:08,530 the perception is going to be, this is the deficiency that the LMA needs to take responsibility for. 2279 03:20:08,530 --> 03:20:09,950 and we don't think that's reasonable. 2280 03:20:10,550 --> 03:20:12,810 And so we do want to revisit that issue of what happens 2281 03:20:12,810 --> 03:20:15,450 to these sites that haven't been repaired 2282 03:20:15,450 --> 03:20:17,110 either because of a lack of resources. 2283 03:20:17,210 --> 03:20:19,430 And if we need more funding, then the administration 2284 03:20:19,430 --> 03:20:22,470 should be putting that in there proposed budget for 2020. 2285 03:20:22,710 --> 03:20:24,350 And that funding is not in there. 2286 03:20:25,690 --> 03:20:28,150 The second item is something that I brought it 2287 03:20:28,150 --> 03:20:29,110 before your board before. 2288 03:20:29,290 --> 03:20:32,150 We have had a periodic inspection, a levian inspection program 2289 03:20:32,150 --> 03:20:33,830 that gives us all of the deficiencies 2290 03:20:33,830 --> 03:20:36,530 with existing levies, but we don't have that for the floodways. 2291 03:20:36,530 --> 03:20:41,450 And so I'm looking forward to reviewing this report and seeing and hoping that it identifies 2292 03:20:42,110 --> 03:20:46,950 where through maintenance, a lack of maintenance for vegetation or sediment or subsidence, 2293 03:20:47,610 --> 03:20:51,770 we don't have sufficient capacity in our levy systems. To bring that home, I want to cite two 2294 03:20:51,770 --> 03:20:58,590 examples that I know are problems. On February 27th of 2019, we had a flood event on Cash Creek 2295 03:20:58,590 --> 03:21:05,770 and a levy overtopped in two locations at a flow of 26,400 CFS. The advertised capacity for that 2296 03:21:05,770 --> 03:21:10,590 system is 30,000 CFS, and that's what the core, the locals, the state, believed what it was, 2297 03:21:10,730 --> 03:21:13,330 but yet we overtop the levees system to flow well below that. 2298 03:21:13,850 --> 03:21:17,070 We still don't know why that's the case, and we don't know what the plan is to do anything 2299 03:21:17,070 --> 03:21:18,290 about it. 2300 03:21:18,890 --> 03:21:21,330 The other area is that the Fremont Weir. 2301 03:21:22,110 --> 03:21:26,810 There's a riparian forest that's been growing for some time on the east side of the Fremont 2302 03:21:26,810 --> 03:21:27,230 Weir. 2303 03:21:27,530 --> 03:21:31,890 That's not in compliance with the maintenance program that are the maintenance requirements 2304 03:21:32,950 --> 03:21:35,070 for the advertised channel capacity. 2305 03:21:35,070 --> 03:21:39,910 I know there are other locations like that, and knowing where these are so that we can prioritize funding. 2306 03:21:40,430 --> 03:21:42,830 I'm hoping are identified in this report. 2307 03:21:43,550 --> 03:21:48,410 The association will make comments on it, and hopefully we can work with you to address both of those issues going forward. 2308 03:21:48,590 --> 03:21:49,160 So thank you. 2309 03:21:50,330 --> 03:21:52,290 Any questions from Rick? 2310 03:21:53,750 --> 03:22:00,330 Okay, you're working with both President and Wade on trying to develop these. 2311 03:22:00,330 --> 03:22:06,310 Number one, reporting systems and identification systems, 2312 03:22:06,850 --> 03:22:10,350 the more information we get on these, the better, I think, 2313 03:22:10,570 --> 03:22:13,990 and then we can deal with the data as we can. 2314 03:22:14,430 --> 03:22:16,510 So I would hope that would continue. 2315 03:22:18,350 --> 03:22:22,590 We just like to see some urgency brought to completing the storm damage repairs. 2316 03:22:23,230 --> 03:22:25,010 I think that's an equal issue. 2317 03:22:25,630 --> 03:22:27,890 If the resources don't exist within an apartment, 2318 03:22:27,890 --> 03:22:32,570 then what other resources are available? Can we contract with local LMA to do the 2319 03:22:32,570 --> 03:22:36,670 live your repairs, or can additional resources be brought to bear with us that you 2320 03:22:36,670 --> 03:22:38,090 consider that as well? 2321 03:22:40,560 --> 03:22:41,240 Yeah, Joe. 2322 03:22:46,540 --> 03:22:53,760 On cash-create, I understand there's been subsidence and cash-create areas. 2323 03:22:53,960 --> 03:22:54,680 Is that correct? 2324 03:22:54,940 --> 03:22:55,200 Yes. 2325 03:22:55,680 --> 03:23:01,100 So is that the most likely reason that the levees are being overtoped, 2326 03:23:01,260 --> 03:23:02,920 that we're losing gradient through there? 2327 03:23:02,920 --> 03:23:06,100 I want to be careful about forming an opinion 2328 03:23:06,100 --> 03:23:06,980 without seeing the data. 2329 03:23:07,160 --> 03:23:08,720 The Department did survey it. 2330 03:23:08,860 --> 03:23:10,200 And so we're going to have that data. 2331 03:23:10,520 --> 03:23:12,760 I understand that a department has been doing hydraulic modeling, 2332 03:23:13,140 --> 03:23:15,160 using that survey data to prepare report. 2333 03:23:15,620 --> 03:23:16,860 Oh, that's to document it. 2334 03:23:17,000 --> 03:23:19,020 And I think we ought to hold out judgment. 2335 03:23:19,800 --> 03:23:22,680 But it is correct to say that there has been subsidence 2336 03:23:22,680 --> 03:23:24,220 in that general area. 2337 03:23:24,540 --> 03:23:26,020 That was my next question. 2338 03:23:26,240 --> 03:23:28,020 It seems that it should be a very high priority 2339 03:23:28,020 --> 03:23:29,980 to get new hydraulic modeling. 2340 03:23:29,980 --> 03:23:33,600 I believe it only has a 10-year design. 2341 03:23:34,380 --> 03:23:34,760 Yeah. 2342 03:23:34,920 --> 03:23:35,800 It's something like that. 2343 03:23:36,060 --> 03:23:38,140 And this year's foot event was smaller than that. 2344 03:23:38,240 --> 03:23:38,880 And it overtopped. 2345 03:23:39,400 --> 03:23:39,660 Yeah. 2346 03:23:40,300 --> 03:23:42,840 So this is like, we're asking for a failure. 2347 03:23:43,020 --> 03:23:45,980 Did it overtop on the south side or the north side? 2348 03:23:46,640 --> 03:23:47,920 It overtopped on two locations. 2349 03:23:48,360 --> 03:23:52,160 It overtopped on the north side just downstream of the community to YOLO 2350 03:23:52,160 --> 03:23:55,980 and the department did a wonderful job. 2351 03:23:55,980 --> 03:23:58,880 Flood fighting, sandbagging to make sure that we didn't have a failure there. 2352 03:23:58,880 --> 03:24:03,760 And then there was also a overtopping on the south side 2353 03:24:03,760 --> 03:24:04,480 farther downstream. 2354 03:24:05,980 --> 03:24:07,660 OK, yeah, this is something we really need 2355 03:24:07,660 --> 03:24:10,300 to stay on top of because of potential flooding 2356 03:24:10,300 --> 03:24:12,160 of woodlands of all there. 2357 03:24:14,420 --> 03:24:14,440 Thank you. 2358 03:24:14,780 --> 03:24:15,080 Thank you. 2359 03:24:15,540 --> 03:24:16,500 Any other questions? 2360 03:24:17,380 --> 03:24:17,720 The board. 2361 03:24:22,900 --> 03:24:27,720 OK, Preston, I think you've heard the boards concern. 2362 03:24:30,000 --> 03:24:32,860 We need you to sit down with the team 2363 03:24:32,860 --> 03:24:38,360 And develop some reports back on what to do about these issues. 2364 03:24:39,200 --> 03:24:40,680 One is the repeater fenders. 2365 03:24:41,960 --> 03:24:44,120 One is the designated floodway. 2366 03:24:44,280 --> 03:24:46,820 What's our way forward here, program. 2367 03:24:48,140 --> 03:25:03,500 And then I guess this last issue is the storm damage repairs we need to somehow develop some 2368 03:25:03,500 --> 03:25:07,200 funding, and I'm not sure whether or not to include that. 2369 03:25:07,400 --> 03:25:10,260 I've done seems to me Rick is right. 2370 03:25:10,460 --> 03:25:13,200 I mean, if this has been areas been designated 2371 03:25:13,200 --> 03:25:15,120 as a storm damage repair, 2372 03:25:15,160 --> 03:25:18,360 the state is going to come in with funding and do, 2373 03:25:18,980 --> 03:25:22,260 then we shouldn't have it on inspection report 2374 03:25:22,260 --> 03:25:24,880 that's the efficiency of the LMA, 2375 03:25:25,560 --> 03:25:27,500 but I don't know how you want to deal with that. 2376 03:25:27,600 --> 03:25:29,300 Well, after discussing those, 2377 03:25:29,560 --> 03:25:30,220 you still tell us. 2378 03:25:30,220 --> 03:25:43,300 And then the final issue is this issue of subsidence and over-topping in these two areas that we probably should look at, and I guess is being looked at at the present time. 2379 03:25:43,700 --> 03:25:45,100 We can follow up. 2380 03:25:45,280 --> 03:25:47,240 Any other concerns to the board? 2381 03:25:50,960 --> 03:25:51,140 Okay. 2382 03:25:51,520 --> 03:25:52,600 Thanks very much, Percy. 2383 03:25:58,110 --> 03:25:58,490 Okay. 2384 03:25:58,810 --> 03:26:02,410 Item C-9C has been removed from the agenda. 2385 03:26:03,390 --> 03:26:07,270 At this point, Kyle Bickler, Senior Engineer, 2386 03:26:07,630 --> 03:26:15,190 he works for the Christianel team in the Department of Water Resource. 2387 03:26:15,590 --> 03:26:21,800 He's going to give us an informational briefing on the 7-mile 2388 03:26:21,800 --> 03:26:25,120 setback project along the north bank of the Sacramento Viper. 2389 03:26:26,660 --> 03:26:27,340 Good afternoon. 2390 03:26:27,900 --> 03:26:29,420 President Agar and members of the board. 2391 03:26:30,020 --> 03:26:30,740 My name is Kyle Bickler. 2392 03:26:30,880 --> 03:26:32,460 I'm with Department of Water Resources. 2393 03:26:33,120 --> 03:26:39,300 I'm here today to provide a briefing on the lower L-Core and Basin Libby setback project. 2394 03:26:40,140 --> 03:26:42,740 It's a kind of an exciting day for us. 2395 03:26:43,180 --> 03:26:45,440 I've personally been working on this project for four years. 2396 03:26:45,760 --> 03:26:52,180 I'm the lead to a technical engineer recently taken over as the project manager for Corey 2397 03:26:52,180 --> 03:26:52,800 Lasso. 2398 03:26:53,540 --> 03:26:57,460 We've the board has seen several briefings on this project over the years. 2399 03:26:58,320 --> 03:27:04,800 I want to thank the Board's participation in bringing this project to where it is today. 2400 03:27:05,720 --> 03:27:11,260 And I want to thank our project partners at the Army Corps of Engineers and SafeCA. 2401 03:27:11,260 --> 03:27:25,800 The Reclamation District's 537-785-827 Yellow County and the Landowners as well as Wickland 2402 03:27:25,800 --> 03:27:28,120 breakdown this summer. 2403 03:27:30,680 --> 03:27:35,500 The purpose of this briefing is to provide a status update for the lower L-Permbation 2404 03:27:35,500 --> 03:27:38,520 Libby setback project, which I'll refer to as levels. 2405 03:27:40,300 --> 03:27:44,200 And to inform the Board of our intention to request an approval of the encroachment permit 2406 03:27:44,200 --> 03:27:46,880 at the board meeting on February 28, next month. 2407 03:27:49,670 --> 03:27:55,310 Many of you have seen this in the past, but I'll go through it briefly to orient yourself 2408 03:27:55,310 --> 03:28:00,810 if the mouse works, I'd like to be able to point up here at the screen, but it doesn't 2409 03:28:00,810 --> 03:28:11,410 appear to be working, so I'll read off the red line there, is the existing yellow bypass 2410 03:28:12,170 --> 03:28:17,890 east levee, and that line will shift over to the yellow line, that will become the setback 2411 03:28:20,650 --> 03:28:29,470 It's about a 1,500 to 1,800 foot set back, the brown area in between will be the future expanded 2412 03:28:30,190 --> 03:28:34,150 floodway and will borrow the material for the new levy out of this area. 2413 03:28:35,910 --> 03:28:40,170 If you're not familiar, many of us are, this is the Sacramento National Airport up here, north 2414 03:28:40,170 --> 03:28:47,870 of I-5, Sacramento River, flows down, if you've got an atoneness over here, Woodland is 2415 03:28:47,870 --> 03:28:52,690 across the bypass, and the Sacramento bypass comes to you right here. 2416 03:28:53,150 --> 03:28:56,870 The Army Corps of Engineers is currently working on widening the 2417 03:28:56,870 --> 03:28:57,630 wear. 2418 03:28:57,930 --> 03:29:00,850 It'll widen right here, and then the levy will come straight across. 2419 03:29:01,210 --> 03:29:04,550 So this levy segment that we have here is meant to be temporary. 2420 03:29:06,110 --> 03:29:08,350 We didn't expect that the Corps was going to move as quickly as they did, 2421 03:29:08,450 --> 03:29:09,330 but they're right on our tails. 2422 03:29:09,690 --> 03:29:14,170 And so it looks like they'll be wanting to go to construction in 2021. 2423 03:29:14,870 --> 03:29:19,430 and they're very eager to have us move forward with this project quickly. 2424 03:29:21,750 --> 03:29:25,370 The seven miles, the new levee will be seven miles long. 2425 03:29:25,890 --> 03:29:30,110 The main benefits are flood risk reduction, ecosystem, agricultural preservation, 2426 03:29:31,970 --> 03:29:35,370 sequela notice that determination was filed March 19, 2019, 2427 03:29:35,870 --> 03:29:37,970 and we're expecting to go to construction this summer. 2428 03:29:39,470 --> 03:29:42,090 As you know, the genesis of the lower-alcrum basin, 2429 03:29:42,090 --> 03:29:46,650 So let me set back Project, started with the Center of Life of a Protection Plan and the update, 2430 03:29:47,610 --> 03:29:54,750 based on white feasibility studies, regional studies, and federal and local partners, 2431 03:29:55,450 --> 03:29:59,730 stakeholders were involved as well as the conservation strategy. 2432 03:30:00,000 --> 03:30:04,420 Informed a lot of our mitigation requirements for the project. 2433 03:30:06,460 --> 03:30:11,700 Levels is a multi-ventific project. It's a state-led project. We started about five years ago. 2434 03:30:12,320 --> 03:30:18,760 However, it is required a lot of resources, both within the department and within our consulting partners 2435 03:30:18,760 --> 03:30:26,560 and partnering agencies and permitting agencies. We've worked extremely hard over the last five years to get to where we are today. 2436 03:30:26,560 --> 03:30:32,720 The primary benefits that I'll go over in the next few slides are flood risk reduction, ecosystem, and agriculture. 2437 03:30:34,600 --> 03:30:40,040 Flood benefits include flood risk reduction for over 700,000 people, and more than 50 billion dollars in assets. 2438 03:30:40,700 --> 03:30:45,740 We're going to construct seven miles of new setback levees replacing existing deficient levees. 2439 03:30:45,960 --> 03:30:53,660 The setback levees are designed to withstand the 100-year water source elevation plus one foot for resiliency and climate change adaptation, 2440 03:30:53,660 --> 03:30:56,460 as well as the levees will have six feet of free board. 2441 03:30:57,320 --> 03:31:01,680 The project lowers flood stages on both the Sacramento River and the Illinois pass. 2442 03:31:02,380 --> 03:31:08,000 levees will have a 28-foot wide crown width for resiliency and do come a future raise if needed 2443 03:31:08,000 --> 03:31:11,000 to still also have a 20-foot crown width. 2444 03:31:11,160 --> 03:31:16,600 So we could raise it one foot, further if the future demanded that. 2445 03:31:17,220 --> 03:31:21,800 Both sides of the levee of the water side and the landslide slopes will have four to one slopes 2446 03:31:21,800 --> 03:31:27,740 to allow use of on-site clay, but if you can imagine existing levees out there today have roughly 2447 03:31:27,740 --> 03:31:32,500 two and a half to one slope, so they barely have 20 foot crowned with, they're comparatively 2448 03:31:32,500 --> 03:31:37,500 this levees are going to be much larger, much more resilient or robust and redundant. 2449 03:31:38,820 --> 03:31:45,360 We'll be constructing three miles of seeped berms, in areas where the blanket is not sufficient 2450 03:31:45,360 --> 03:31:46,860 to deal with seepage. 2451 03:31:46,860 --> 03:31:52,520 For the most part, the lower L-Corm basin has a very thick clay blanket, and then in the 2452 03:31:52,520 --> 03:31:55,540 few areas where the clay blanket is thinner, we'll construct secret verms. 2453 03:31:58,340 --> 03:32:05,220 I was hoping that this wasn't as small as it is on the screen, but if I could just give you 2454 03:32:05,220 --> 03:32:08,240 a quick overview, I'll try to remember what the numbers are. 2455 03:32:09,120 --> 03:32:11,320 There are five points here. 2456 03:32:12,480 --> 03:32:18,140 These are hydraulic modeling points, or I'm sorry there's actually six points, we've got the 2457 03:32:18,140 --> 03:32:21,520 My sheet bridge is probably the biggest one that we want to talk about. 2458 03:32:22,260 --> 03:32:24,200 This box should be blue. 2459 03:32:24,860 --> 03:32:29,360 When we converted this to a slide yesterday, it actually would thank you very much. 2460 03:32:30,220 --> 03:32:32,380 Jeremy Hill is our H&H modeler. 2461 03:32:33,000 --> 03:32:33,840 He's with us. 2462 03:32:34,060 --> 03:32:39,500 If you have any questions, basically, at the I-Street Bridge location or the 100 year flood event, 2463 03:32:39,660 --> 03:32:49,940 the flood stays will lower by 0.8 feet and up here at the top of I-5, the very 2464 03:32:49,940 --> 03:32:55,600 northernmost dot, if the cursor will turn on, is will lower the water 2465 03:32:55,600 --> 03:33:02,800 serve salvation in the L of bypass by 0.71 feet. And just south of that east of 2466 03:33:02,800 --> 03:33:10,860 Woodland, the water serve salvation will lower by about 0.7 feet. And the third 2467 03:33:10,860 --> 03:33:18,840 dot down in the L of bypass, will lower by about 0.2 feet. There's one anomalous 2468 03:33:18,840 --> 03:33:24,840 point here that has seen a small increase of about an inch, about a tenth of a foot. 2469 03:33:25,080 --> 03:33:28,740 And the reason for that is we're allowing more water in a little bypass. 2470 03:33:29,180 --> 03:33:34,960 And so as we implement the Center for Firefly Protection Plan and Stages, there will be 2471 03:33:34,960 --> 03:33:38,840 slight impacts that are have to be offset by future projects and future widenings. 2472 03:33:38,880 --> 03:33:41,460 And that's the plan where we can't do everything it wants. 2473 03:33:42,140 --> 03:33:48,800 But this project goes a long way to expand the olivipass to about more flood water to come off the main stem. 2474 03:33:49,880 --> 03:33:55,460 river get it away from the urban areas of Sacramento into the olvipass, which is what 2475 03:33:55,460 --> 03:34:03,100 it's designed for. The olvipass carries 80% of the footfills. And so the main goal is to 2476 03:34:03,620 --> 03:34:08,860 get the water into the olvipass. The Army Corps of Engineers recognizes this. They have 2477 03:34:08,860 --> 03:34:17,440 the third-way authorized project to widen the weir. And so we're moving right along in that 2478 03:34:17,440 --> 03:34:17,920 effort. 2479 03:34:19,580 --> 03:34:23,460 Acosis and benefits produce 1,000,000 acres of additional 2480 03:34:23,460 --> 03:34:26,920 innovative floodplain, 18 acres of riparian wood and 2481 03:34:26,920 --> 03:34:31,980 forest, 320 acres of native perennial grassland, 169 2482 03:34:31,980 --> 03:34:36,580 acres of giant goddess snake habitat, and 156 acres of 2483 03:34:36,580 --> 03:34:38,180 swanes and hawk, foraging habitat. 2484 03:34:39,460 --> 03:34:47,420 Agriculture benefits improve flood protection for the 2485 03:34:47,420 --> 03:34:54,820 County. 282 acres of Agaland protected under easement as a result of this project. Interior 2486 03:34:54,820 --> 03:35:01,360 drainage system for the lower Alcorm basin is being upgraded to discharge the 100 year storm 2487 03:35:01,360 --> 03:35:06,780 event. Currently their discharge capabilities around the 10 year event and they have local flooding. 2488 03:35:07,720 --> 03:35:14,000 So there's a big modernization effort. Safeica has been helping us out quite a bit on this working 2489 03:35:14,000 --> 03:35:20,140 directly with the Reclamation Districts in the landowners to improve drainage in the basin. 2490 03:35:22,240 --> 03:35:25,640 The three Reclamation Districts are in the process of merging. 2491 03:35:26,460 --> 03:35:30,580 RD537 will take over as the single Reclamation District in a lower L-Carm basin. 2492 03:35:31,400 --> 03:35:35,820 And their future corporation yard will be constructed of above the 100-year floodplain, 2493 03:35:36,700 --> 03:35:41,720 which is a great benefit for them for their operations and emergency response throughout the basin. 2494 03:35:42,920 --> 03:35:50,160 Project funding, $151 million comes from Proposition 2035 million from Prop 68, 2495 03:35:50,780 --> 03:35:55,440 $5 million from Prop 1, give us a total of $291 million. 2496 03:35:55,800 --> 03:35:59,500 That's covered planning, design, permitting real estate, and that will take us through construction. 2497 03:36:01,870 --> 03:36:05,170 Our construction contract procurement schedule that we're targeting, 2498 03:36:05,230 --> 03:36:09,410 we're targeting to go out to construction and advertise for construction on March 27. 2499 03:36:09,410 --> 03:36:16,230 We'll job walk with the bidders approximately three weeks later on April 14, and then three weeks later. 2500 03:36:16,490 --> 03:36:19,970 So a total of six weeks this package will be on the street. 2501 03:36:20,770 --> 03:36:26,550 We'll open bids and award and commit funds approximately eight to ten days later. 2502 03:36:27,450 --> 03:36:32,230 The Department Division of Engineering will issue notice of being in work on June 1. 2503 03:36:32,610 --> 03:36:38,030 We expect three years of construction, depending on the water years, 2504 03:36:38,030 --> 03:36:42,310 If we have high water in the Sacramento River, the little bypass ground water could be high for 2505 03:36:42,310 --> 03:36:48,810 extended periods of time, which kick us into a fourth year of construction, it's a contingency 2506 03:36:48,810 --> 03:36:49,310 idea. 2507 03:36:50,170 --> 03:36:55,030 We're on the hook for five years of monitoring, mitigation, establishment. 2508 03:36:55,970 --> 03:37:02,190 That takes us into at least 20-27, are there any questions on this? 2509 03:37:02,310 --> 03:37:02,970 Are we going fast? 2510 03:37:03,070 --> 03:37:07,470 I know the day is long, I'm trying to help you guys out here, but I'll stop if you have 2511 03:37:07,470 --> 03:37:16,970 questions and in closing we request for approval of the encroachment permit for levels will be a consent item at next month's board meeting. 2512 03:37:17,610 --> 03:37:18,490 That's all I have. 2513 03:37:19,290 --> 03:37:19,350 Okay. 2514 03:37:20,150 --> 03:37:22,570 Any questions for Kyle? 2515 03:37:27,220 --> 03:37:27,240 Okay. 2516 03:37:27,520 --> 03:37:27,580 Jane. 2517 03:37:31,070 --> 03:37:38,370 Is the increased flood protection for agriculture agricultural uses within the bypass or outside? 2518 03:37:40,330 --> 03:37:47,470 Primarily, it's in the protected, how do I go back, previous, you want to go back for me, please. 2519 03:37:49,750 --> 03:38:00,630 It's in the protected area of the lower, okay, so currently the existing seven miles 2520 03:38:00,630 --> 03:38:05,450 here experiences a slope failure about once every three or four years from the bypass as high. 2521 03:38:05,450 --> 03:38:07,790 They're actually battling a failure right now. 2522 03:38:09,170 --> 03:38:11,990 And the department fixed a couple of failures in 2017 2523 03:38:11,990 --> 03:38:14,590 on the North Levy the Sac bypass. 2524 03:38:15,430 --> 03:38:16,810 Do the nature of the clay soil. 2525 03:38:17,310 --> 03:38:19,350 In fact, all the levies in the vicinity 2526 03:38:19,350 --> 03:38:22,690 of this project area have clay soils that generally 2527 03:38:22,690 --> 03:38:24,570 misbehaved when they get wet. 2528 03:38:24,890 --> 03:38:25,930 They lose strength. 2529 03:38:27,430 --> 03:38:28,790 And that's one of the reasons why we're going 2530 03:38:28,790 --> 03:38:29,650 to 41 slopes. 2531 03:38:30,230 --> 03:38:31,370 Yeah, clay soils. 2532 03:38:31,550 --> 03:38:32,650 A clay soils, yes. 2533 03:38:33,310 --> 03:38:38,850 You could look at it as since flood stages are being lowered in the olivipass. 2534 03:38:39,010 --> 03:38:44,950 They'll see less frequent inundation during the larger events or the inundation won't be as high. 2535 03:38:46,450 --> 03:38:54,930 So you could argue that the city of Woodland across the way is receiving some increased flood protection 2536 03:38:54,930 --> 03:38:59,610 because during 100 years from event, they're seeing lower water levels on their levees. 2537 03:39:01,070 --> 03:39:07,430 by approximately 0.6 feet and just above 0.71 feet. 2538 03:39:07,670 --> 03:39:13,110 So almost a foot, we'd argue that even after the weir is widened, they'll see further. 2539 03:39:14,050 --> 03:39:16,070 And the CPG berms would help as well. 2540 03:39:16,730 --> 03:39:20,830 The CPG berms are mainly to control exigredients for the new levee. 2541 03:39:21,790 --> 03:39:22,930 Cut-off walls are used. 2542 03:39:23,510 --> 03:39:28,210 This particular basin is interesting because cut-off walls may 2543 03:39:29,490 --> 03:39:34,190 creates some issues during certain hydraulic events because primary 2544 03:39:34,190 --> 03:39:37,570 seepage in the lower L-Cormbasin comes from the Sacramento River. 2545 03:39:38,090 --> 03:39:41,150 Seepage is generally the Sacramento River is higher by about three 2546 03:39:41,150 --> 03:39:42,750 feet in the Yola bypass. 2547 03:39:43,810 --> 03:39:48,210 And the non-Raven Lever evaluation program actually rated the entire 2548 03:39:49,430 --> 03:39:54,690 Sacramento River east-levy of the lower L-Cormbasin as highly 2549 03:39:54,690 --> 03:39:56,510 susceptible to under seepage. 2550 03:39:57,230 --> 03:40:05,930 And so if we had a cutoff wall to mitigate high-exit gradients on our setback levy, there's 2551 03:40:05,930 --> 03:40:10,590 a scenario where groundwater would come in from the Sacramento River and actually hit 2552 03:40:10,590 --> 03:40:14,450 that as a seafood block and raise groundwater levels in the lower-alpern basin. 2553 03:40:14,690 --> 03:40:21,330 And so to make sure that the farmers can can farm and they generally have to deal with high 2554 03:40:21,330 --> 03:40:27,070 water out there on a regular basis. They actually can predict very quickly, depending on where 2555 03:40:27,070 --> 03:40:30,450 the rivers that, which fields they can actually get into and which fields they can't. 2556 03:40:33,180 --> 03:40:34,220 All right. Thank you. 2557 03:40:35,440 --> 03:40:37,160 You said the, 2558 03:40:39,370 --> 03:40:44,890 the stage of the river at the ice street bridge is going to be reduced by 2559 03:40:44,890 --> 03:40:50,430 two and a half feet or something. No. With just the lower all-cran basin, let me set back 2560 03:40:50,430 --> 03:40:57,190 project. This stage reduction is 0.8 feet. After the weird widening, it reduces another 2561 03:40:57,190 --> 03:41:03,170 foot of about and so it's about 1.8 feet total. So we have an opportunity about five 2562 03:41:03,170 --> 03:41:08,130 years from now if we can implement this project and the weird completes that we'll have stage 2563 03:41:08,130 --> 03:41:13,950 reductions at I-Story of almost two feet. That's pretty know. Do you happen to know 2564 03:41:13,950 --> 03:41:20,630 whether there's the, in the emergency operations, manuals or procedures, 2565 03:41:23,510 --> 03:41:24,410 the stage of the 2566 03:41:24,410 --> 03:41:31,930 ice street is, I think, 27 feet and then they start emergency operations. I'm assuming that's 2567 03:41:31,930 --> 03:41:35,150 going to be adjusted based up on this work that's being done. 2568 03:41:36,110 --> 03:41:40,210 I would guess the core might update the water control manual as part of the weird widening. 2569 03:41:40,210 --> 03:41:44,470 I don't know, that I could be a question we could follow upon for you. 2570 03:41:44,470 --> 03:41:45,530 Oh, do you know that? 2571 03:41:47,000 --> 03:41:48,780 No, patient, you need to open a gate. 2572 03:41:48,960 --> 03:41:50,940 She wouldn't change that rule. 2573 03:41:50,980 --> 03:41:51,340 Right. 2574 03:41:51,700 --> 03:41:53,900 Oh, I mean, oh, okay. 2575 03:41:54,420 --> 03:41:54,540 Okay. 2576 03:41:54,720 --> 03:41:57,400 So you'd open the gate the same as you did before. 2577 03:41:57,860 --> 03:41:58,140 All right. 2578 03:41:58,140 --> 03:41:59,060 Just be less free. 2579 03:41:59,340 --> 03:42:00,120 Less free. 2580 03:42:00,420 --> 03:42:00,640 Okay. 2581 03:42:01,120 --> 03:42:01,540 All right. 2582 03:42:02,700 --> 03:42:03,880 Any other questions? 2583 03:42:05,180 --> 03:42:06,000 Okay. Thank you. 2584 03:42:06,340 --> 03:42:07,100 Thank you. 2585 03:42:13,000 --> 03:42:13,300 Okay. 2586 03:42:13,500 --> 03:42:13,600 Where? 2587 03:42:14,220 --> 03:42:14,480 President? 2588 03:42:16,720 --> 03:42:24,120 It's an item of this importance and magnitude and intention of appropriate on the consent. 2589 03:42:29,140 --> 03:42:30,700 Well, further the couple times. 2590 03:42:30,740 --> 03:42:32,000 We're more than a couple times. 2591 03:42:32,100 --> 03:42:33,680 Do you want it? 2592 03:42:33,680 --> 03:42:34,340 What's the actual? 2593 03:42:35,060 --> 03:42:36,880 It just seems because it's so important. 2594 03:42:38,000 --> 03:42:38,140 Okay. 2595 03:42:39,040 --> 03:42:40,180 We can do that. 2596 03:42:40,380 --> 03:42:40,560 Sure. 2597 03:42:40,640 --> 03:42:42,780 We can agenda as in any way you'd like. 2598 03:42:43,140 --> 03:42:44,060 You want it as a hearing? 2599 03:42:47,210 --> 03:42:47,730 Okay. 2600 03:42:50,410 --> 03:42:51,990 We're on items 10. 2601 03:42:53,210 --> 03:42:57,530 My understanding is that item 10A has been removed. 2602 03:42:58,630 --> 03:43:00,390 Jake, can you? 2603 03:43:00,410 --> 03:43:01,730 Yes, that's correct. 2604 03:43:02,710 --> 03:43:04,670 Jake, can you give us a report, please? 2605 03:43:05,410 --> 03:43:05,650 Yes. 2606 03:43:06,710 --> 03:43:11,930 Mr. Harmats, who initially requested to appear before the board, had another commitment. 2607 03:43:12,210 --> 03:43:14,770 One could not wait until his item was being called. 2608 03:43:14,950 --> 03:43:18,250 And two, we also worked out he has a new designs, 2609 03:43:21,940 --> 03:43:22,080 which 2610 03:43:22,080 --> 03:43:30,460 We're going to need to talk to the board, so we have a path forward, so he's going to submit a new application with the redesign for the board's consideration at a future date. 2611 03:43:31,920 --> 03:43:35,380 Okay, so this will be next week, next month. 2612 03:43:38,180 --> 03:43:38,640 All right. 2613 03:43:40,040 --> 03:43:52,810 We're on item 10B, which is the Resolution and Accessory Conway Preservation Group and presentation from 2614 03:43:54,090 --> 03:43:56,430 Mr. Bartwood and Matt DeGrew. 2615 03:44:00,790 --> 03:44:03,650 I guess I need glasses for part of this. 2616 03:44:04,090 --> 03:44:04,410 Good afternoon. 2617 03:44:04,870 --> 03:44:06,370 President Eggher, members of board. 2618 03:44:06,510 --> 03:44:07,330 My name is Joe Bartlett. 2619 03:44:07,530 --> 03:44:10,370 I work with DWR in the Division of Multi-Manifet initiatives. 2620 03:44:10,690 --> 03:44:14,330 I think it's been quite a while since I've had the opportunity to give a 2621 03:44:14,330 --> 03:44:15,130 presentation to you also. 2622 03:44:15,150 --> 03:44:16,890 I appreciate you having me here today. 2623 03:44:17,950 --> 03:44:21,350 We're going to talk a little bit about the resolution and necessity for 2624 03:44:23,770 --> 03:44:25,810 property needed for the lower L-Corn based and 2625 03:44:25,810 --> 03:44:35,090 be set back on project and go through the presentation overview, start with some introductions. 2626 03:44:35,830 --> 03:44:38,370 I do have a co-presenter that I'll be interested in here in a moment. 2627 03:44:39,350 --> 03:44:45,210 I'll talk about the purpose of this presentation, a project overview, the resolution of necessity requirements, 2628 03:44:46,910 --> 03:44:51,770 the authorities of the board, the resolution of necessity findings, the project conception, 2629 03:44:51,770 --> 03:44:57,630 project need and of course the details of the subject property. 2630 03:45:00,620 --> 03:45:13,560 So, I've arranged this myself as to a partlet. Matt DeGrew, senior right away, agent for the vision of adjourning with end department, will speak a little bit later on the specifics of the subject property. 2631 03:45:17,090 --> 03:45:32,790 So, the purpose of this presentation is to, and we have a request from the Board, obviously, to consider the adoption of the attached resolution, number 2020-01, authorizing eminent domain to acquire and fee-simple interest, a part of the following property. 2632 03:45:32,790 --> 03:45:38,770 identified by Yola County assessor-prosal number sorry I always want to say 2633 03:45:38,770 --> 03:45:46,010 8 p.m., but if you end 0, 4, 2, dash 1, 9, 0, dash 0, 4, and 0, 5, 7, 2634 03:45:46,350 --> 03:45:49,790 dash 2, 0, 0, dash 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 0, 6. 2635 03:45:50,110 --> 03:45:52,730 And we'll refer to that furthermore as the property. 2636 03:45:52,730 --> 03:45:57,910 for the lower lorahode core base and leveeset back or commonly in a levels project. 2637 03:46:00,840 --> 03:46:05,480 I'm the brief project of VD, and this probably looks pretty familiar to you since we just saw the 2638 03:46:05,480 --> 03:46:08,520 same slide only moments ago in Kyle's presentation. 2639 03:46:10,760 --> 03:46:14,260 The project is located just south of i5, 2640 03:46:14,380 --> 03:46:19,720 and is bound on the west by the yellow bypass on the east by the Sacramento River and 2641 03:46:19,720 --> 03:46:25,840 at the Southwest Sacramento Bypass to kind of see at the bottom right corner, it says West Sacramento, 2642 03:46:25,960 --> 03:46:31,420 that's the location of the CHP Academy, and below that, you would see offscreen that would 2643 03:46:31,420 --> 03:46:38,100 where we would be where our highway AD causeway crosses the Yellow Bypass. So that's basically where 2644 03:46:38,100 --> 03:46:44,860 we're located. We talked a little bit about the, you know, what this project does, 2645 03:46:44,860 --> 03:46:49,680 covered it pretty extensively, but for the most part, we're setting back this 2646 03:46:49,680 --> 03:46:56,240 levies, 7 miles long, 1,500 foot setback. There's approximately 2,000 2647 03:46:56,240 --> 03:47:02,440 acres within that footprint, over 1100 acres of inadated floodplain, or reconnected 2648 03:47:02,440 --> 03:47:09,260 floodplain, which will provide benefits to both salamonids and regulatory birds 2649 03:47:09,260 --> 03:47:16,760 when it is inundated, there's support for agriculture which, you know, we want to 2650 03:47:16,760 --> 03:47:22,320 great that there's great detail provided by cows this month's ago, but obviously 2651 03:47:22,320 --> 03:47:28,580 flood protection and also where we're converting, you know, land permanently, we're 2652 03:47:28,580 --> 03:47:37,020 putting other lands into easements so that they can no longer be converted. Just to go over a 2653 03:47:37,020 --> 03:47:39,020 couple dates here. 2654 03:47:39,340 --> 03:47:43,460 They were back in July of 2016 as when the project was initiated. 2655 03:47:44,440 --> 03:47:47,960 We had the four-way request to alter levees in September of 2017. 2656 03:47:49,200 --> 03:47:54,460 The draft, EIR, EIS was put out in May 2018. 2657 03:47:55,960 --> 03:48:01,160 The in March 2019 is when the determination, the notice of 2658 03:48:01,160 --> 03:48:08,900 was filed for our secret documents, and then currently our final four-weight package is with 2659 03:48:08,900 --> 03:48:15,460 division, U-says division, and it's under review, and we anticipate it's approval in the next 2660 03:48:15,460 --> 03:48:21,700 coming weeks, and then, you know, as Kyle just went through, we're anticipating going to 2661 03:48:21,700 --> 03:48:26,740 construction in the summer of 2020 this year, so just a few months from now. 2662 03:48:30,810 --> 03:48:41,330 Just to go over the resolution and necessity requirements, I noticed I'm intent to adopt a resolution and necessity was milled on January 6th, 2020 to the owner's record. 2663 03:48:42,830 --> 03:48:45,810 There's a hearing required, which we're in the middle of right now. 2664 03:48:46,530 --> 03:48:58,710 There's a finding and determination, a public use of property, the property description, resolution and necessity findings, and then ultimately adoption of resolution and necessity go over a few of those details here. 2665 03:49:02,580 --> 03:49:05,680 Start up the thirties of the board first. 2666 03:49:06,460 --> 03:49:08,600 The board has authority for resolution necessity and 2667 03:49:08,600 --> 03:49:13,000 eminent domain to California water code section 8590 and 2668 03:49:13,000 --> 03:49:16,980 California water code section 8593 and additional authority and 2669 03:49:16,980 --> 03:49:19,620 California code of civil procedure section 1245. 2670 03:49:21,680 --> 03:49:22,300 .210B 2671 03:49:24,700 --> 03:49:26,280 and they talk a little bit about those 2672 03:49:26,280 --> 03:49:29,480 resolution necessity findings that I mentioned earlier slide. 2673 03:49:29,500 --> 03:49:33,040 Board is being asked to find and determine that the public 2674 03:49:33,040 --> 03:49:43,720 interest in necessity or required by the proposed project, the project is planned or located in a manner that will be most compatible with the greatest public aid and the least private injury. 2675 03:49:44,460 --> 03:49:48,680 The property described in a resolution necessity is necessary for the proposed project. 2676 03:49:49,380 --> 03:49:54,940 And the offer required by government code section 7267.2 has been made to the owner of record. 2677 03:49:54,940 --> 03:49:55,680 So, 2678 03:49:59,810 --> 03:50:26,250 again, I think it's a pretty familiar slide, and Kyle did go through this, I might have a slightly different discussion around it, but, you know, project, how this project really came about, and really started quite a long time ago, with the passing of the SB5-2008 Flip Protection Act, at that time DWR began its planning with the CBAPP and ultimately the board adopted that in 2012. 2679 03:50:27,070 --> 03:50:34,610 for the revisions, and the update to 27 CBP update were informed by more refined and detailed 2680 03:50:34,610 --> 03:50:38,630 studies at local levels, including the Sacramento River Basin White Peacefully Study, performed 2681 03:50:38,630 --> 03:50:44,870 by DWR and also the, I think it's the, I'm going to get this wrong, but the regional flood 2682 03:50:44,870 --> 03:50:51,110 management study and it's the lower Sacramento River Delta North group. 2683 03:50:51,230 --> 03:50:55,350 I think I have that right, it's, but they're the ones who put together the regional flood 2684 03:50:56,270 --> 03:51:08,230 So in the highlights of all of those studies and previous studies are basically, you know, one of the big things that we know is that about 80% of large fled conveyance goes through the bypass system. 2685 03:51:09,150 --> 03:51:15,210 So when you start to talk about adding resiliency and capacity, it makes a lot sense to look in the bypasses. 2686 03:51:15,490 --> 03:51:22,590 So when you start looking at the bypasses and you look at those, you know, more detail studies on the landscape of yellow bypass. 2687 03:51:23,530 --> 03:51:29,810 But the Basin-wide and Regional Studies recognize that there's pretty good opportunities in the lower 2688 03:51:29,810 --> 03:51:39,330 Alcorn Basin, specifically it opens up the SAC bypass and allows the future expansion of the 2689 03:51:39,330 --> 03:51:44,030 wear, but even in itself at lower stages, just by doing that, because it will increase the efficiencies. 2690 03:51:45,030 --> 03:51:51,110 There's also a lot of alignment between the two plans, and with a lot of work with the locals, 2691 03:51:51,110 --> 03:51:57,230 the RDs, landowners, and others, we were able to adjust the linements and come up with something 2692 03:51:57,230 --> 03:52:02,190 that really worked for everyone. So, through all this planning purposes, I think we came up with a, 2693 03:52:02,190 --> 03:52:09,470 you know, a really good project that's able to achieve multi-benefits, you know, flood risk, agricultural 2694 03:52:10,570 --> 03:52:18,210 and ecosystem benefits. So, it really is kind of, I think a model for the future on how we can 2695 03:52:18,210 --> 03:52:23,090 multi-benefit projects, and it really is, I think, a well-planned and thought-out project. 2696 03:52:25,130 --> 03:52:28,210 I should, I know I'd start with something like that, so I'm going to read because I 2697 03:52:28,210 --> 03:52:31,990 want to forget this one. So, this project will be most compatible with the Grace Public 2698 03:52:31,990 --> 03:52:36,830 Good and at least private entry because it will provide maximum flood protection while simultaneously 2699 03:52:36,830 --> 03:52:40,930 minimizing the amount and private land that will be acquired. The project design incorporates 2700 03:52:40,930 --> 03:52:46,330 communicate community input and advice, technical, and safety considerations, and multiple agency 2701 03:52:46,330 --> 03:52:52,130 review is. So, I talked a lot about the stakeholder participation, but we've also been 2702 03:52:52,130 --> 03:52:56,750 working closely with the different agencies, including California Department, 2703 03:52:56,870 --> 03:53:02,270 Official Wildlife, U.S. Fish and Wildlife Services, and then with the court self from 2704 03:53:02,270 --> 03:53:08,770 a technical standpoint. We've also employed, as part of our quality assurance program, several 2705 03:53:08,770 --> 03:53:16,250 experts outside experts of the department to review our work in terms of safety of design 2706 03:53:16,250 --> 03:53:19,790 from hydrology and hydrology standpoint and geotechnical standpoint. 2707 03:53:22,880 --> 03:53:29,400 The project need, this is also some repetitive information, but I'll go through it quickly, 2708 03:53:30,460 --> 03:53:34,320 flooding threatens life and public safety property, critical infrastructure, and the environment. 2709 03:53:35,720 --> 03:53:41,220 This project will improve public safety for over 700,000 people, it will increase protection 2710 03:53:41,220 --> 03:53:46,640 of more than $50 billion in assets, it provides increased system resiliency, it replaces 2711 03:53:46,640 --> 03:53:52,660 efficient existing levees. Kyle talked a little bit about some of the recent issues we've 2712 03:53:52,660 --> 03:53:56,880 had out there. We haven't had a brittle failure or we lost the levee, but we've had stability 2713 03:53:56,880 --> 03:54:03,820 issues and slething and slope failures over the years and even in 2017 we had fairly extensive 2714 03:54:03,820 --> 03:54:15,600 damage that had to be repaired. As the system ages and we see higher flows and the back 2715 03:54:15,600 --> 03:54:19,040 isn't, you know, in addition to doing all the great things it does, it also gets an opportunity 2716 03:54:19,560 --> 03:54:21,880 to improve a structure and bring it up to modern standards. 2717 03:54:25,100 --> 03:54:28,940 And then, you know, I mentioned earlier, we're going to provide increased in a data flood 2718 03:54:28,940 --> 03:54:33,880 plants for diversity of native aquatic and traditional species in the ULVIPAS. 2719 03:54:36,950 --> 03:54:41,630 And with that, I would like to introduce that degree to come up and talk a little bit 2720 03:54:41,630 --> 03:54:45,410 more about the specifics of the subject property. 2721 03:54:51,650 --> 03:54:54,910 Good afternoon, or President Eger, 2722 03:54:55,710 --> 03:54:56,470 bill of board members. 2723 03:54:57,410 --> 03:54:59,390 Matt are good, seeing a right-of-way agent 2724 03:54:59,390 --> 03:55:00,510 Department of Water Resources. 2725 03:55:02,070 --> 03:55:04,850 Before I get started, I'd just like to acknowledge that 2726 03:55:04,850 --> 03:55:06,050 on Tuesday afternoon. 2727 03:55:06,490 --> 03:55:09,430 We did receive a letter from the property owner, 2728 03:55:09,850 --> 03:55:11,550 contesting the four different findings 2729 03:55:11,550 --> 03:55:13,130 that we're here today to discuss. 2730 03:55:14,270 --> 03:55:17,410 So we do intend to address those. 2731 03:55:17,870 --> 03:55:21,170 But first, I'd like to describe 2732 03:55:21,170 --> 03:55:25,650 subject property a little bit to you. So, the subject property is owned by a common 2733 03:55:25,650 --> 03:55:39,390 represervation group LLC. It is 2APN, APN, 042, 190, 0404, 057, 200, 0006. We have a proposed 2734 03:55:39,390 --> 03:55:45,850 acquisition in fee of roughly 21 acres out of a total larger parcel of about 97 acres. 2735 03:55:48,270 --> 03:55:57,050 The property is currently located, you can see on the slide, it is the highlighted yellow 2736 03:55:57,050 --> 03:56:02,430 area that is underneath the existing levee on the northern portion of the project. 2737 03:56:03,650 --> 03:56:07,410 So the highlighted strip is the 21 acres that we are proposing to purchase. 2738 03:56:08,630 --> 03:56:13,470 The yellow hashed area is what would be remaining of the larger parcels. 2739 03:56:13,470 --> 03:56:18,050 So roughly 76 acre acres would be remaining. 2740 03:56:20,330 --> 03:56:22,670 So the property is needed for this project. 2741 03:56:23,630 --> 03:56:29,310 It's going to be degraded in order to increase the flood capacity of the yellow bypass to produce. 2742 03:56:30,110 --> 03:56:36,390 And also, it will be providing upland habitat for special species, namely giant goddess snake. 2743 03:56:37,310 --> 03:56:40,490 There are some utility relocation activities that are going to take place. 2744 03:56:40,490 --> 03:56:45,490 and portions of the degraded borough will be used 2745 03:56:46,270 --> 03:56:48,850 from Chale for the new setback levee. 2746 03:56:51,210 --> 03:56:53,210 So two offers were provided to the property owner. 2747 03:56:54,010 --> 03:56:57,330 The first one was on July 23rd, 2019 2748 03:56:58,290 --> 03:57:01,690 and the second offer was on November 13th, 2019 2749 03:57:02,670 --> 03:57:04,850 and I'll get into a little bit more specifics 2750 03:57:04,850 --> 03:57:07,330 about why there were two offers when we address 2751 03:57:07,950 --> 03:57:09,510 the property owner's concerns. 2752 03:57:10,530 --> 03:57:19,490 So, with that, we're going to get into the letter that was submitted for objections that the 2753 03:57:19,490 --> 03:57:24,510 profineer has and Joe's going to come up using address the first two of them, namely that 2754 03:57:24,510 --> 03:57:30,070 the public interest in necessity do not require the proposed project and also that the proposed 2755 03:57:30,070 --> 03:57:34,430 project was not planned in a manner that will be most compatible with the greatest public 2756 03:57:34,430 --> 03:57:38,490 good and least private injury. So just going to come and speak to them. 2757 03:57:48,500 --> 03:57:50,380 So I'm still 2758 03:57:50,380 --> 03:57:52,700 Joe Bartlin. I still work for DWR for the record. 2759 03:57:55,000 --> 03:57:57,540 So the first comment and I'm not going 2760 03:57:57,540 --> 03:58:01,360 to read the entire thing. I know the board does have the letter in the pocket, but speaking 2761 03:58:01,360 --> 03:58:08,500 to the public interest and necessity do not require the project comment. I think there's no 2762 03:58:08,500 --> 03:58:14,060 doubt that, you know, the increased capacity of the, of the alibi-pass, the second 2763 03:58:14,060 --> 03:58:20,320 and bypassed you, you know, from just a flood risk reduction point alone, do serve the 2764 03:58:20,320 --> 03:58:26,060 public interest, but it's also the multi-manifit nature is very much in line with the public 2765 03:58:26,060 --> 03:58:26,620 interest also. 2766 03:58:27,020 --> 03:58:32,540 But from a technical standpoint, there were some mentions of free war concerns on the 2767 03:58:32,540 --> 03:58:40,040 side of the bypass, and while we do recognize that there are free board deficiencies in other 2768 03:58:40,040 --> 03:58:45,440 deficiencies throughout the bypass, we do not believe that this project impacts that in 2769 03:58:45,440 --> 03:58:51,580 any way, and in fact, as Kyle mentioned earlier, we do see state reductions throughout the 2770 03:58:51,580 --> 03:58:51,980 system. 2771 03:58:52,260 --> 03:58:58,880 In fact, we see state reductions from just above the ridge cut all the way down to essentially 2772 03:58:58,880 --> 03:59:11,800 The causeway, or it starts to see a very slight increase, where essentially we have a contraction of the fledway and we see a little bump because we have a part of vision and that's kind of a nerdy engineering thing. 2773 03:59:12,320 --> 03:59:24,300 But what we are seeing is 0.71 feet in the 100 year at essentially at the i5 crossing, which is adjacent or it's roughly the same latitude as woodland. 2774 03:59:24,300 --> 03:59:30,880 And just south of that, 0.6, so as we go downstream and get close to that construction, 2775 03:59:31,120 --> 03:59:36,480 we see less of less benefit, but directly across from the bypass, we are seeing still 2776 03:59:36,480 --> 03:59:40,420 a quarter-foot of drop in stage for the 100-year. 2777 03:59:42,100 --> 03:59:44,280 What does that mean in terms of flood detection? 2778 03:59:45,840 --> 03:59:49,600 I wrote down, I just pulled one of the numbers off of that previous slide, 2779 03:59:52,120 --> 03:59:52,720 and it's actually 2780 03:59:52,720 --> 03:59:59,320 out of the flood frequency curve, but when we look at the 57 plus 6 which is kind of the prescribed freeboard in this area. 2781 04:00:00,000 --> 04:00:07,660 The existing annual seedless probability, and this is pretty nerdy, but I'm going to try to clear it up as I go through. 2782 04:00:08,480 --> 04:00:18,980 It goes from 0.003 to 0.001. So there are already pretty small numbers when we talk about actual overtopion exceedants. 2783 04:00:19,880 --> 04:00:21,980 And then kind of more common terms, 2784 04:00:22,120 --> 04:00:23,840 we usually take the inverse of that number 2785 04:00:23,840 --> 04:00:27,160 and then we change that to a year. 2786 04:00:27,440 --> 04:00:30,040 And it's basically the exceedance 2787 04:00:30,040 --> 04:00:31,440 that we would annual exceedance. 2788 04:00:31,880 --> 04:00:34,860 So how often do we think that's possible in a year? 2789 04:00:35,300 --> 04:00:38,460 So we refer to level of protection usually like the 100 year 2790 04:00:38,460 --> 04:00:39,460 or the 200 year. 2791 04:00:40,180 --> 04:00:43,320 So if you were looking at these events in that terminology, 2792 04:00:43,940 --> 04:00:45,880 we're talking about changing an over-topping event 2793 04:00:45,880 --> 04:00:51,340 from the 333-year event to the 5,000-year event. 2794 04:00:51,920 --> 04:00:57,220 So overtopping is not a very likely scenario 2795 04:00:57,220 --> 04:00:59,000 in the bypass to start off with. 2796 04:00:59,980 --> 04:01:01,360 So why does that matter? 2797 04:01:01,740 --> 04:01:06,980 Well, I think the point about freeboard is the excessive amount 2798 04:01:06,980 --> 04:01:08,860 of freeboard or some people's mind 2799 04:01:08,860 --> 04:01:13,500 that the large numbers in terms of freeboard are really 2800 04:01:13,500 --> 04:01:19,500 more for wind wave run up so we have waves that drive up this really long fetches because 2801 04:01:19,500 --> 04:01:25,580 the bypass is so wide and we can see waves up for feet is what we see in some of these larger 2802 04:01:25,580 --> 04:01:33,900 events. So by us reducing stages even though it doesn't really change probability that much especially 2803 04:01:33,900 --> 04:01:41,300 when you're talking about 3,000 year events to 5,000, those probabilities that are really not 2804 04:01:41,300 --> 04:01:45,420 meaningful. But when we start talking about reducing stages of seven 2805 04:01:45,420 --> 04:01:49,220 tenths and you have a four foot wave, we're actually talking about increasing 2806 04:01:49,220 --> 04:01:53,600 flow protection. If we were to do a lot of analysis and really look at 2807 04:01:53,600 --> 04:01:58,060 how head is affecting seed vision, other things, we would similarly see 2808 04:01:58,060 --> 04:02:03,960 reductions in, you know, in the frequency of exceeding the 2809 04:02:03,960 --> 04:02:06,780 design allowances. So we would actually see improvements in 2810 04:02:06,780 --> 04:02:13,180 protection but we definitely don't see any impacts. So, secondly, moving to the 2811 04:02:13,180 --> 04:02:16,960 comment regarding the proposed project was not planned in a manner. It will be 2812 04:02:16,960 --> 04:02:21,580 most compatible with the greatest public good in least private injury. I just want 2813 04:02:21,580 --> 04:02:26,380 to reiterate some of the points I made on the earlier slide that we have, I'm 2814 04:02:26,380 --> 04:02:33,220 spent a lot of time working with stakeholders and with agencies, with the board 2815 04:02:33,220 --> 04:02:39,820 staff and just generally all around the property owners on the ground to really plan out 2816 04:02:39,820 --> 04:02:44,660 a multi-benefit project that serves the public interest in the best way possible. 2817 04:02:45,040 --> 04:02:51,780 We've made adjustments to the project all along the way to try to reduce impacts to 2818 04:02:51,780 --> 04:02:57,180 folks on the ground's operations and we continue to work with the property owners, including 2819 04:02:57,180 --> 04:02:59,980 in the Conway Preservation Group to find ways 2820 04:02:59,980 --> 04:03:02,160 where we can minimize those impacts, 2821 04:03:02,780 --> 04:03:04,880 but the project without sacrificing 2822 04:03:04,880 --> 04:03:06,940 the project's purpose, which is in the public interest. 2823 04:03:07,660 --> 04:03:09,220 So with that, I'd like to, and let's first question, 2824 04:03:09,540 --> 04:03:10,980 and there may be, because some of that stuff 2825 04:03:10,980 --> 04:03:13,020 was a pretty number centric. 2826 04:03:14,020 --> 04:03:15,800 I'll take questions and I'll give it back to. 2827 04:03:16,820 --> 04:03:21,570 OK, any questions for DWR? 2828 04:03:31,100 --> 04:03:35,060 There's no agriculture activity going on on that level. 2829 04:03:35,060 --> 04:03:43,800 is there? No sir, so currently the levy does have SJDD 2830 04:03:43,800 --> 04:03:49,320 easements on it for levy purposes and for flood control purposes or I believe there's 2831 04:03:49,320 --> 04:03:57,380 two easements already on the subject property. So it is used as a levy right now and as we 2832 04:03:57,380 --> 04:04:04,240 are moving the levy obviously we need to degrade the levy to allow water into the new flood 2833 04:04:04,240 --> 04:04:12,260 plane. So yeah, it's not easy. It's our cultural currently. Thank you. Okay. Thanks, Joe. 2834 04:04:18,810 --> 04:04:19,630 Also, still mat. 2835 04:04:22,000 --> 04:04:30,520 So to address a point number three, the objection to the finding that the property proposed to take in is on this sort for the project. 2836 04:04:31,720 --> 04:04:36,140 The location of the property is right for the project is as Joe mentioned. 2837 04:04:36,140 --> 04:04:40,340 And it is the underneath the levy and the levy will be degraded for the project. 2838 04:04:41,620 --> 04:04:47,880 But more pointed, the letter states that the property doesn't believe that fee take 2839 04:04:47,880 --> 04:04:49,360 is necessary for the project. 2840 04:04:52,600 --> 04:04:58,180 So the levy is, or the property is underneath the de-existing levy. 2841 04:04:58,280 --> 04:05:00,740 It is heavily encumbered already as it is. 2842 04:05:02,020 --> 04:05:04,720 We are going to further encumber that. 2843 04:05:04,860 --> 04:05:09,240 We're going to be removing the grading portions of the levee. 2844 04:05:09,380 --> 04:05:17,100 There will be permanent portions that were remain that will be used for special species habitat for the giant coder snake. 2845 04:05:19,380 --> 04:05:21,780 The currently there's an already road on there. 2846 04:05:21,780 --> 04:05:24,780 That will no longer be available to the property owner. 2847 04:05:25,120 --> 04:05:26,920 There will be no utility left on this area. 2848 04:05:26,920 --> 04:05:30,380 will be completely encountered when the project is done. 2849 04:05:31,740 --> 04:05:36,400 So that alone, an RBVVVVV is a reasonable for a FETAic fiat 2850 04:05:36,400 --> 04:05:36,940 position. 2851 04:05:38,940 --> 04:05:42,680 So currently, they do have limit utility 2852 04:05:42,680 --> 04:05:46,480 to that level, to patrol their property in the yield 2853 04:05:46,480 --> 04:05:48,700 bypass from an elevated vantage point. 2854 04:05:48,720 --> 04:05:51,160 So that's how they currently use it. 2855 04:05:51,520 --> 04:05:54,880 The department has committed to working with the new RG 2856 04:05:54,880 --> 04:05:58,660 and the property owner to coordinate access to the new setback 2857 04:05:58,660 --> 04:06:02,780 level so they will have access to that as well to use that as a similar 2858 04:06:02,780 --> 04:06:05,100 vantage point to viewing the property in the bypass. 2859 04:06:10,730 --> 04:06:15,890 So just the actual construction features of the project are going to take 2860 04:06:15,890 --> 04:06:17,770 away all utility of the property. 2861 04:06:19,150 --> 04:06:24,410 We in addition have to place perpetual mitigation easements over that for 2862 04:06:24,410 --> 04:06:29,610 the Triangars Naked Habitat that the department is responsible for and will be in perpetuity. 2863 04:06:31,210 --> 04:06:40,930 So in order to live up to that obligation, a fee acquisition is also the most appropriate 2864 04:06:41,930 --> 04:06:47,650 property right to have and it should also be noted that it is the department's standard 2865 04:06:47,650 --> 04:06:52,930 process that whenever we acquire property for mitigation purposes we do acquire it in 2866 04:06:52,930 --> 04:07:00,590 So, for all those reasons, we do believe that fee acquisition of this 21 acres is reasonable and appropriate. 2867 04:07:01,730 --> 04:07:08,330 What would you say would be the differential and price between an easement and a fee title? 2868 04:07:11,630 --> 04:07:18,550 Well, for typically for a levy is usually 5% for how heavily we encumber. 2869 04:07:18,550 --> 04:07:20,550 But it would be 5% less. 2870 04:07:21,750 --> 04:07:21,950 Yes. 2871 04:07:22,530 --> 04:07:22,650 Yes. 2872 04:07:22,910 --> 04:07:24,490 That's typically how. 2873 04:07:24,650 --> 04:07:25,870 How heavy. 2874 04:07:26,050 --> 04:07:27,190 And come to survive. 2875 04:07:27,670 --> 04:07:29,590 They're 95%. 2876 04:07:29,590 --> 04:07:32,550 So it kind of leads into the. 2877 04:07:33,290 --> 04:07:36,070 The next point to property on this object to that. 2878 04:07:36,350 --> 04:07:39,050 We have failed to comply with the government code. 2879 04:07:39,550 --> 04:07:42,830 Um, 72, 67.2 or more. 2880 04:07:42,830 --> 04:07:45,950 Namely, that our offer has that did include all the required elements. 2881 04:07:46,790 --> 04:07:53,310 So, the required elements are that it is written, that it contained a summary or a basis for 2882 04:07:53,310 --> 04:07:59,030 how the property was evaluated, and that the just compensation is included, and also 2883 04:07:59,030 --> 04:08:04,310 included, but not limited to, or the data evaluation, the highest and best use, the property 2884 04:08:04,310 --> 04:08:11,090 zoning, many comparable fails, if that's how the property was valued, and if appropriate 2885 04:08:11,090 --> 04:08:12,710 get severed damages. 2886 04:08:14,410 --> 04:08:16,130 So all of our standard offer packages, 2887 04:08:16,250 --> 04:08:18,530 that is included in all of our offer packages, 2888 04:08:19,170 --> 04:08:20,910 and it was included in the offer packages 2889 04:08:20,910 --> 04:08:22,750 so this property owner as well. 2890 04:08:23,550 --> 04:08:25,610 Now, what's the objection to the property owner? 2891 04:08:26,970 --> 04:08:29,770 That we didn't meet all the requirements 2892 04:08:29,770 --> 04:08:31,110 and all those elements. 2893 04:08:31,530 --> 04:08:33,150 Yeah, what requirements did we meet? 2894 04:08:34,110 --> 04:08:38,770 I believe they think they're asserting that 2895 04:08:38,770 --> 04:08:44,990 Not enough information was included in the offer, namely that the full appraisal wasn't included, 2896 04:08:46,170 --> 04:08:51,390 but we were only required to produce a summary in the offer and not the full appraisal. 2897 04:08:52,390 --> 04:08:59,730 So we have since had meetings with the property owner and they've expressed desire to see the full appraisal so they can have more information. 2898 04:09:00,610 --> 04:09:05,490 We're not opposed to that. 2899 04:09:05,490 --> 04:09:10,950 to them. So we are going to be working with them to provide them the more information so they can better understand 2900 04:09:10,950 --> 04:09:14,550 how we came to the just conversation in our offer. 2901 04:09:15,130 --> 04:09:20,850 We can understand that even the adoption of the resolution doesn't prevent them from continuing to 2902 04:09:20,850 --> 04:09:24,430 negotiate. Yes. We understand that. Yes. 2903 04:09:24,690 --> 04:09:31,350 We understand that. Yes. This is only because of the time constraints that we face with this project. 2904 04:09:31,350 --> 04:09:39,950 we have to move this project along and we're establishing a valuation date by adopting this 2905 04:09:39,950 --> 04:09:40,330 resolution. 2906 04:09:41,010 --> 04:09:44,150 That's the only thing we're doing, they can negotiate and deliver blue in the face. 2907 04:09:44,410 --> 04:09:44,570 Is that right? 2908 04:09:48,070 --> 04:09:54,550 So there were actually two objections in the into under this and funding number four. 2909 04:09:54,650 --> 04:09:58,690 So that was the first that everything that we didn't provide sufficient information in the 2910 04:09:58,690 --> 04:10:03,690 second, is that, namely that the seven damages were not addressed in our offer. 2911 04:10:05,670 --> 04:10:11,070 So, the seven damages, any seven damages that they may be entitled to? 2912 04:10:11,070 --> 04:10:12,370 Oh, seven damages. 2913 04:10:14,270 --> 04:10:18,610 So, this is why there are actually two offers we provided them. 2914 04:10:18,850 --> 04:10:24,690 So, initially, we provided an offer, an initial offer on July 23rd. 2915 04:10:24,690 --> 04:10:29,250 we received a letter back from the landowner with some concerns. 2916 04:10:29,870 --> 04:10:33,090 And one of those concerns was that they didn't believe 2917 04:10:33,090 --> 04:10:36,430 seven damages were appropriately analyzed. 2918 04:10:38,110 --> 04:10:39,470 So we take those concerns seriously. 2919 04:10:40,850 --> 04:10:44,790 We decided to do another appraisal of the property. 2920 04:10:45,930 --> 04:10:50,170 We provided that appraisal with the letter that they provided us. 2921 04:10:50,270 --> 04:10:52,610 So the appraisal had in hand their concerns 2922 04:10:52,610 --> 04:10:59,190 about the seven damages and the president went out and repraises the property and he found 2923 04:10:59,190 --> 04:11:02,410 that seven damages were not appropriate in this instance. 2924 04:11:04,150 --> 04:11:10,910 So our second offer on November 13th, there were no seven damages in there, however, the second 2925 04:11:10,910 --> 04:11:14,610 appraisal did establish a new just compensation. 2926 04:11:16,150 --> 04:11:21,470 So it is that offer that we are using to establish the value of the property moving forward. 2927 04:11:21,470 --> 04:11:25,490 And that does not include severance damages. 2928 04:11:26,930 --> 04:11:31,050 That's based upon two views by the appraiser. 2929 04:11:31,330 --> 04:11:31,890 That is correct. 2930 04:11:33,490 --> 04:11:40,770 And willing to share all the back information full appraisal with the property of. 2931 04:11:40,810 --> 04:11:42,650 Yeah, we don't have a problem with that. 2932 04:11:42,770 --> 04:11:42,930 Okay. 2933 04:11:44,270 --> 04:11:48,550 And then I just, I'll just finish by saying that, you know, we're moving down this process 2934 04:11:48,550 --> 04:11:56,710 because we feel we need to, for the success of the project and this very, you know, procedural 2935 04:11:56,710 --> 04:12:02,730 process and that by submitting this statement to you on the property owner by making 2936 04:12:02,730 --> 04:12:09,130 the objections, they are also following what they need to do, procedurally, so should this be 2937 04:12:09,130 --> 04:12:15,630 adopted this resolution by submitting this, the property owner has preserved their right to contest 2938 04:12:15,630 --> 04:12:17,910 this action moving forward a trial. 2939 04:12:18,410 --> 04:12:20,530 So they've done that. 2940 04:12:22,510 --> 04:12:25,930 When do we have to actually post the money with the court? 2941 04:12:27,310 --> 04:12:31,350 We have to do that before we file any proceedings with the court. 2942 04:12:31,570 --> 04:12:34,750 OK, so when would that be after the board's action? 2943 04:12:37,250 --> 04:12:39,310 We're working to streamline that process. 2944 04:12:40,870 --> 04:12:44,630 This one will probably move along faster than the other ones since we now 2945 04:12:44,630 --> 04:12:48,430 have the procedure down, so I imagine I'll probably take a few weeks. 2946 04:12:49,210 --> 04:12:56,530 Okay, all right, so there's only a couple of weeks, a few weeks with the filing in the court. 2947 04:12:57,110 --> 04:12:58,250 You've given them money also. 2948 04:12:58,810 --> 04:13:00,570 Yeah, they've been titled to withdrawing that money. 2949 04:13:00,690 --> 04:13:01,630 Yeah, that's interesting. 2950 04:13:01,930 --> 04:13:02,270 All right. 2951 04:13:03,770 --> 04:13:04,390 Thank you. 2952 04:13:04,670 --> 04:13:06,550 Any questions for Matt? 2953 04:13:07,610 --> 04:13:08,990 And I believe the property owner is here. 2954 04:13:09,270 --> 04:13:09,490 Yes. 2955 04:13:10,350 --> 04:13:11,010 Excuse me. 2956 04:13:15,440 --> 04:13:17,480 So that's all I have. 2957 04:13:17,480 --> 04:13:18,560 I'll wait for the proper. 2958 04:13:19,440 --> 04:13:20,820 Oh, Tim, do you want a question? 2959 04:13:21,540 --> 04:13:22,400 We just have to confirm. 2960 04:13:22,440 --> 04:13:24,380 I think the answer to my question is part of the presentation. 2961 04:13:26,040 --> 04:13:28,000 The roads on the levy. 2962 04:13:28,240 --> 04:13:29,600 Levy's going to be gone. 2963 04:13:29,820 --> 04:13:31,380 But I have access to the new road and the new levy. 2964 04:13:33,060 --> 04:13:35,520 We are committing to helping coordinate that. 2965 04:13:35,900 --> 04:13:35,940 Okay. 2966 04:13:36,220 --> 04:13:37,120 And then the new R.D. 2967 04:13:37,260 --> 04:13:39,880 And you also said there's going to be an ease in place on that. 2968 04:13:39,900 --> 04:13:43,340 Same property for the mitigation, which is presumably in perpetuity. 2969 04:13:43,340 --> 04:13:54,700 Yes, on the same 20 plus papers. Yes, a little bit of that easement. Well, it would be the department. Well 2970 04:13:54,700 --> 04:14:02,140 It would be purchasing fee under the board at that so the board would own it in fee right and then the easement 2971 04:14:02,140 --> 04:14:07,460 We're still working through those details, but it is the department who has the obligation to 2972 04:14:08,580 --> 04:14:13,320 Right for the terms of the permit for mitigation to have the easement. Yeah, okay. Thank you 2973 04:14:15,220 --> 04:14:18,900 Any other questions before we, okay? Thank you, Madam. 2974 04:14:18,920 --> 04:14:20,340 I would like to. 2975 04:14:25,530 --> 04:14:29,470 As I understand that this, please correct me if I don't have a correct right. 2976 04:14:30,310 --> 04:14:33,930 The acquisition is not of the entire assessor parcels. 2977 04:14:34,190 --> 04:14:36,190 It's of a portion of each of them. 2978 04:14:36,190 --> 04:14:36,790 That's correct. 2979 04:14:37,210 --> 04:14:42,750 Then I would suggest our resolution say that rather than say we are acquiring assessor parcel. 2980 04:14:42,750 --> 04:14:45,550 Oh number and it's a personal number. 2981 04:14:45,550 --> 04:14:45,750 Okay. 2982 04:14:45,870 --> 04:14:45,930 Okay. 2983 04:14:45,930 --> 04:14:47,450 portion of that we're leaving it. 2984 04:14:47,490 --> 04:14:54,230 You stated that it's 20 something acres of 90 something acre total of two assessor parcels. 2985 04:14:54,930 --> 04:14:59,670 And we all notice that the parcels are not a legal definition of land. 2986 04:14:59,670 --> 04:14:59,930 So 2987 04:15:00,000 --> 04:15:09,000 I hope perhaps saying legal description is attached. It is, but resolution needs to say it's attached, because that's really what it is being acquired. 2988 04:15:09,760 --> 04:15:12,060 Okay, understood. Thank you. 2989 04:15:12,860 --> 04:15:14,000 Thank you. 2990 04:15:16,000 --> 04:15:18,120 Mr. Garry, little Vosit. 2991 04:15:20,500 --> 04:15:21,680 Something like that. 2992 04:15:26,290 --> 04:15:29,730 Thank you. Garry Leviager, presenting kind of a preservation group. 2993 04:15:30,870 --> 04:15:36,550 First, I would like to emphasize that we are working with staff and have been working with staff 2994 04:15:36,550 --> 04:15:42,370 and will continue to work with staff both the right away and the engineering to try 2995 04:15:42,370 --> 04:15:47,470 and resolve the problems that we have or that will be created by your project. 2996 04:15:48,650 --> 04:15:54,850 We have worked tirelessly on the design of the decommissioned levy because commonly 2997 04:15:54,850 --> 04:16:01,030 The President-President group is currently actively participating in a salmon restoration project 2998 04:16:01,030 --> 04:16:08,810 with another part of DWR that goes hand-to-hand with the recommissioning of the Fremont 2999 04:16:08,810 --> 04:16:16,890 Weir and the Natch, that are built being built north of this, but as Matt indicated today 3000 04:16:16,890 --> 04:16:22,630 is the day where you're considering adopting a resolution necessity and representing landowners 3001 04:16:22,630 --> 04:16:28,810 I have to make sure that our administrative record is established and all defenses that we have 3002 04:16:28,810 --> 04:16:35,730 available to us are preserved for the eminent domain suit that will follow if you do adopt 3003 04:16:35,730 --> 04:16:37,490 the resolution today. 3004 04:16:39,590 --> 04:16:46,750 We do believe that the greatest public good and least private injury has not been sustained 3005 04:16:47,650 --> 04:16:54,730 to date, fee versus easement. That's the big issue. It's a big issue not only with this 3006 04:16:54,730 --> 04:17:02,550 property but with the property further to the north, the Wilson Ranch, the buzz oats, 3007 04:17:03,310 --> 04:17:04,530 Dan Ramos property, 3008 04:17:06,790 --> 04:17:11,930 that the least private harm would be accomplished if an easement was 3009 04:17:11,930 --> 04:17:20,950 and not fee. I've heard from the presentation of staff that this is a 90 sum acre parcel 3010 04:17:20,950 --> 04:17:29,990 of property, 21 acres below the levy and that's the take. Well, the larger parcel from our 3011 04:17:29,990 --> 04:17:41,450 perspective is not just 97 acres. Conway Ranch is approximately 17,243 acres with 8,000 acres 3012 04:17:41,450 --> 04:17:49,190 is so of it located in the bypass, and although that this 21 acres that is proposed to be taken 3013 04:17:49,190 --> 04:17:54,610 is currently under the levy, it is owned in fee by Conway, and it is an integral part 3014 04:17:54,610 --> 04:17:59,830 of the farming operation and other business enterprises that are conducted on Conway Ranch. 3015 04:18:00,510 --> 04:18:07,150 It is an effective portion of the east boundary of Conway Ranch, and Conway Ranch owners 3016 04:18:07,150 --> 04:18:13,990 do have access, and they patrol it, and they police it because there are a lot of things 3017 04:18:13,990 --> 04:18:20,370 that go on out there, including farming, hunting, et cetera, and there are folks that 3018 04:18:20,370 --> 04:18:21,890 come in that aren't invited. 3019 04:18:23,590 --> 04:18:29,190 And we have heard earlier comments today as we were shooting through with homeless and whatnot. 3020 04:18:29,770 --> 04:18:33,910 Those aren't the concerns, but there are hunters, there are fishermen, there are folks 3021 04:18:33,910 --> 04:18:37,250 that want to do vandalism and or acquire farm property, 3022 04:18:37,610 --> 04:18:40,350 the farm equipment that they don't want to buy. 3023 04:18:41,230 --> 04:18:43,810 And these do create significant problems. 3024 04:18:44,810 --> 04:18:51,070 So what this 21 acre take in feed does is punch a hole 3025 04:18:51,950 --> 04:18:58,330 in portion of Conway Ranch, that does, in fact, affect our security. 3026 04:18:59,050 --> 04:19:01,130 And when you look at that larger parcel, 3027 04:19:01,130 --> 04:19:08,150 instead of a larger parcel of 97 acres, you can get an idea that there may be significant 3028 04:19:08,150 --> 04:19:17,190 severance damages that are created by this take. And that's what we wanted you to consider. 3029 04:19:17,990 --> 04:19:21,850 If an easement is taken, that goes away. This, 3030 04:19:24,050 --> 04:19:27,670 I will remind some people that have been around 3031 04:19:27,670 --> 04:19:32,490 have institutional knowledge that I think the project, the flight control project was 3032 04:19:32,490 --> 04:19:36,830 formally called the Sacramento River Flight Control Project and I believe it was adopted 3033 04:19:36,830 --> 04:19:41,630 in 1913 officially when your predecessor board was created by special session. 3034 04:19:43,170 --> 04:19:48,130 And that project has been built over this hundred plus years on easements. 3035 04:19:49,290 --> 04:19:53,670 The greatest majority of this project is built on easements. 3036 04:19:54,390 --> 04:19:58,430 Levy Footprints are on easements held by SSJDD. 3037 04:19:59,230 --> 04:20:03,030 The bypass is controlled by flood easements. 3038 04:20:03,730 --> 04:20:09,710 In fact, there's very few components of this project that are owned in fee by the state. 3039 04:20:10,370 --> 04:20:21,770 And I think that the fact that the state has been required to provide necessary lands easements in rights away for its federal partner for this project for over 100 years. 3040 04:20:21,770 --> 04:20:28,450 and has consistently found that the necessary lands are easement interests and not fee 3041 04:20:28,450 --> 04:20:34,710 go a long way and that's part of what I wanted to say to help you understand what 3042 04:20:34,710 --> 04:20:41,170 the breadth of our objection is and what may be the basis of a right take objection as we 3043 04:20:41,170 --> 04:20:41,970 move forward. 3044 04:20:45,580 --> 04:20:52,360 There has was some comment somewhere that without the fee there would not be 3045 04:20:52,360 --> 04:20:56,300 control. Well, I don't think that's true. 3046 04:20:56,640 --> 04:21:05,160 easements be it they be flood control easements, wildlife habitat and mitigation easements, 3047 04:21:05,460 --> 04:21:11,100 enhancement easements over the years have proven that the easement holder does have the 3048 04:21:11,100 --> 04:21:17,840 control. And the right to use the property for those specific uses. And the landowner 3049 04:21:17,840 --> 04:21:21,780 can do nothing to interfere with those uses, nothing. 3050 04:21:22,920 --> 04:21:24,680 So what we're talking about is something 3051 04:21:24,680 --> 04:21:28,400 where this can go hand in hand, the uses of the property, 3052 04:21:28,500 --> 04:21:32,860 owner, the uses of the public without feetaking. 3053 04:21:37,560 --> 04:21:41,520 We do submit that the offer did not comply with government code 3054 04:21:41,520 --> 04:21:43,780 section 7267.2. 3055 04:21:44,380 --> 04:21:47,820 There were two offers that were submitted, both times 3056 04:21:47,820 --> 04:21:50,600 the land owner objected, asking for more information. 3057 04:21:50,600 --> 04:21:53,940 and we did not get it. 3058 04:21:54,540 --> 04:21:59,620 There was some comment that the second appraisal did have some information concerning 3059 04:21:59,620 --> 04:22:02,960 severance damages, but that's not how we read the government code. 3060 04:22:03,380 --> 04:22:07,140 We read it to say that there has to be a discussion regarding severance damages. 3061 04:22:07,500 --> 04:22:08,480 There has to be a narrative. 3062 04:22:08,480 --> 04:22:09,820 There has to be some analysis. 3063 04:22:10,300 --> 04:22:17,320 And here what we have is a summary chart, summary base of appraisal, and where it says severance 3064 04:22:17,320 --> 04:22:26,060 is just as zero. Now that doesn't give us enough information to adequately assess, and that's 3065 04:22:26,060 --> 04:22:33,720 where we think that has been deficient. We do want to resolve this matter, but before I get 3066 04:22:33,720 --> 04:22:41,500 there again to perfect my administrative record, I've got a great report earlier on the update 3067 04:22:41,500 --> 04:22:43,340 of the levy setback project. 3068 04:22:43,960 --> 04:22:47,240 We know that almost all the resolutions in necessity 3069 04:22:47,240 --> 04:22:50,660 have here to four been adopted. 3070 04:22:52,160 --> 04:22:59,380 So a very aggressive timeline that is in place for this project. 3071 04:23:00,160 --> 04:23:03,840 And I do want to make sure that my records clear 3072 04:23:03,840 --> 04:23:08,440 that it seems as though this hearing has a predetermined outcome. 3073 04:23:08,440 --> 04:23:15,060 And I just want to state that for the record, again, preserving a legal defense that we may 3074 04:23:15,060 --> 04:23:16,920 have if this case is not resolved. 3075 04:23:17,420 --> 04:23:20,400 But back to it, we know you have a tight timeline. 3076 04:23:20,780 --> 04:23:22,840 We do want to resolve this matter. 3077 04:23:23,460 --> 04:23:28,980 We're working hard with staff on the decommissioned levy, what that's going to look like. 3078 04:23:29,100 --> 04:23:38,420 We're working hard with staff and the reclamation board, the new, our excuse me, reclamation 3079 04:23:38,420 --> 04:23:43,080 So we're doing these things in trying to resolve it. 3080 04:23:43,260 --> 04:23:47,680 I want to also represent to the board that we're working with adjacent landowners. 3081 04:23:48,260 --> 04:23:51,160 We're working with Wilson Farms. 3082 04:23:51,960 --> 04:23:55,660 We're in contact with and working with Lexington. 3083 04:23:56,860 --> 04:24:03,240 We are hopeful to try and put something together for a global resolution that would help 3084 04:24:03,240 --> 04:24:04,520 you meet your timelines. 3085 04:24:05,200 --> 04:24:08,500 I want to make sure that the board understands that. 3086 04:24:08,860 --> 04:24:22,820 I want to further make sure that the board understands that if that isn't done, the resolutions adopted, the amount of domain lawsuit is filed, which sets the date of value. 3087 04:24:23,100 --> 04:24:30,220 The filing of the amount of domain case, and the or the deposit of probably just compensation, not the adoption of the resolution necessity. 3088 04:24:31,640 --> 04:24:40,580 But if that happens, the case is filed, motion for possession is filed, we're now in litigation. 3089 04:24:42,860 --> 04:24:47,320 And sometimes things go a lot slower in litigation that we want them to. 3090 04:24:48,360 --> 04:24:54,040 There's oppositions for motion for possession, which creates a whole different timeline. 3091 04:24:55,000 --> 04:24:57,880 there's right to take trials, which are illegal, 3092 04:24:58,840 --> 04:25:00,360 excuse me, decided by the court, 3093 04:25:00,820 --> 04:25:03,460 but those take time to get scheduled and whatnot. 3094 04:25:07,960 --> 04:25:10,060 It makes your timeline much more difficult. 3095 04:25:11,640 --> 04:25:14,180 So again, I want to emphasize to you. 3096 04:25:14,400 --> 04:25:16,480 We're trying to resolve this. 3097 04:25:16,940 --> 04:25:20,700 We think we're making progress resolving it, 3098 04:25:20,880 --> 04:25:24,480 but of the three issues that we have significantly 3099 04:25:24,480 --> 04:25:31,360 before us as landowners, the decommission, engineering, criteria of the 3100 04:25:31,360 --> 04:25:35,780 levy, the decommission levy, we think we're real close there. The access 3101 04:25:35,780 --> 04:25:40,040 issues, we think we're real close there. The biggest one, the biggest hurdle is 3102 04:25:40,040 --> 04:25:46,600 going to be fever's assessment and we're talking to staff and I don't think we've 3103 04:25:46,600 --> 04:25:51,180 been foreclosed on that. If that could be resolved, we could have something done 3104 04:25:52,520 --> 04:25:55,560 And with that, if you have any questions, I'm happy to answer them. 3105 04:25:55,580 --> 04:26:02,080 If not, it's been a long day, I've been 3106 04:26:04,480 --> 04:26:06,740 waiting years to get Gary where I could 3107 04:26:06,740 --> 04:26:07,900 question him. 3108 04:26:09,220 --> 04:26:10,340 The tables are turned. 3109 04:26:12,200 --> 04:26:12,820 The tables are turned. 3110 04:26:12,820 --> 04:26:18,880 Gary was a attorney in the Mary'sville, Levy, the paternal case, or paternal case. 3111 04:26:20,660 --> 04:26:25,280 Is it possible that you could take a easement? 3112 04:26:26,560 --> 04:26:30,180 In other words, we take it in fee and give you an easement for access. 3113 04:26:31,180 --> 04:26:41,660 Well, not over the decommissioned levy because access would not be really possible there. 3114 04:26:41,940 --> 04:26:48,860 But what we're talking about is the setback area that is not being taken from us at this point. 3115 04:26:48,860 --> 04:26:52,340 but we're working with other landowners to determine 3116 04:26:52,340 --> 04:26:55,500 how that's going to look in relationship 3117 04:26:55,500 --> 04:26:59,140 to private ownership in the after condition 3118 04:26:59,140 --> 04:27:02,860 so that the agricultural uses can be preserved. 3119 04:27:03,820 --> 04:27:05,980 But if you're asking about that area, 3120 04:27:06,440 --> 04:27:07,740 it might happen. 3121 04:27:09,100 --> 04:27:14,400 Well, I know that you're a warrior for protection of people. 3122 04:27:15,060 --> 04:27:17,680 And I hope that we're able to resolve this 3123 04:27:17,680 --> 04:27:21,900 have this project move forward because there is a lot of stake, so there is. 3124 04:27:22,240 --> 04:27:22,920 Thank you. 3125 04:27:35,560 --> 04:27:36,320 Any other questions? 3126 04:27:41,870 --> 04:27:42,550 Okay, thank you. 3127 04:27:45,620 --> 04:27:46,880 Any other comments? 3128 04:27:48,220 --> 04:27:53,940 I still matter to grow. Yes, I did not formally request you got the board take the action 3129 04:27:53,940 --> 04:28:02,900 yet, so at this point to circle back and close the loop, we request that the board adopt 3130 04:28:02,900 --> 04:28:06,600 This resolution, with the edits requested by 3131 04:28:06,600 --> 04:28:12,700 for Memondol and for resolution number, 2020, 0-1. 3132 04:28:13,500 --> 04:28:14,500 Thank you, Matt. 3133 04:28:15,240 --> 04:28:21,300 We're not prepared to do that until we make sure that everybody in the audience 3134 04:28:21,300 --> 04:28:22,640 has had a chance to speak. 3135 04:28:22,880 --> 04:28:25,220 Is there anybody else that wants to speak on this item? 3136 04:28:29,210 --> 04:28:34,170 Okay, seeing none, I'm going to bring this back to the board for discussion and action. 3137 04:28:35,540 --> 04:28:39,060 So, be it. What's the pleasure of the board? 3138 04:28:52,650 --> 04:28:53,390 The resolution? 3139 04:28:56,530 --> 04:28:56,910 Okay. 3140 04:28:57,570 --> 04:28:59,690 Move by country men's second up by 3141 04:28:59,690 --> 04:29:01,710 Romeras, I think, going first, quiet. 3142 04:29:04,850 --> 04:29:07,490 That the staff report be approved. 3143 04:29:09,890 --> 04:29:10,570 Any discussion? 3144 04:29:13,210 --> 04:29:16,710 Mr. President, I would just like to make a minor amendment to that request. 3145 04:29:16,710 --> 04:29:28,630 that I suggest is as Mr. DeGrew mentioned that the adoption of the resolution with the amendments proposed by Vice President Dolan, 3146 04:29:31,050 --> 04:29:32,530 regarding the APN numbers. 3147 04:29:32,810 --> 04:29:33,910 That okay, Tim. 3148 04:29:34,250 --> 04:29:34,910 That up to second. 3149 04:29:36,550 --> 04:29:45,530 Well, the amendments over what's actually being acquired. So we're adopting the resolution, not the staff report. 3150 04:29:55,020 --> 04:29:56,240 Okay, any other questions? 3151 04:29:57,380 --> 04:29:59,380 Okay, we'll call the raw on this. 3152 04:30:04,050 --> 04:30:13,110 Board Member Ramirez, Board Member Velines, Board Member Countryman, Board Member McDonald, Vice President 3153 04:30:13,110 --> 04:30:15,350 Dolan, President Edgar. 3154 04:30:17,290 --> 04:30:19,490 Motion passes unanimously. 3155 04:30:20,750 --> 04:30:24,990 Gary, thank you. We'll continue to try to work on this. 3156 04:30:27,480 --> 04:30:35,320 All right, we're on to item C, 10, C, and this is the last item for this afternoon. 3157 04:30:37,440 --> 04:30:43,580 And Connie Perkins has this item, it's an informational briefing on the Goldfield Slevy Project. 3158 04:30:44,360 --> 04:30:46,100 Is Paul here today? 3159 04:30:46,120 --> 04:30:46,940 Yes, he's right here. 3160 04:30:46,940 --> 04:30:47,680 Oh, there he is. 3161 04:30:48,720 --> 04:30:51,020 Okay, Connie and Paul have this report. 3162 04:30:51,480 --> 04:30:56,080 Okay, President Eger, and members of the board, I'm Connie Perkins, board staff. 3163 04:30:56,080 --> 04:31:01,040 Today, I'm going to introduce Paul Brunner, the Executive Director for three Rivers, 3164 04:31:01,120 --> 04:31:03,620 Levy Improvement Authority, or Trilia. 3165 04:31:04,220 --> 04:31:08,940 He'll be giving an overview of the post-200-Year Goldfield's Levy Project in New 3166 04:31:08,940 --> 04:31:09,440 Accounting. 3167 04:31:10,460 --> 04:31:17,120 This project was federally authorized by Section 1305 of the Water Resources Development Act of 2018 3168 04:31:17,730 --> 04:31:22,680 for non-federal interests to construct a new levy to connect to the existing levy with 3169 04:31:22,680 --> 04:31:23,260 high ground. 3170 04:31:23,760 --> 04:31:29,560 We will be requesting approval of an encroachment permit for this project at the February board meeting. 3171 04:31:30,900 --> 04:31:34,700 Eventually, the goal is to make the proposed new levy part of the State Plan of Floor Control, 3172 04:31:35,300 --> 04:31:37,440 in the Sacramento River Floor Control project. 3173 04:31:38,220 --> 04:31:42,660 The 1953 MOU between the core and the board will need to be amended. 3174 04:31:43,020 --> 04:31:44,080 So now we'll turn it to Paul. 3175 04:31:52,660 --> 04:31:57,340 Well, hello, President Eger and members of the board, 3176 04:31:57,440 --> 04:31:58,120 good afternoon. 3177 04:31:58,940 --> 04:32:02,340 It's been an interesting day going through the discussions. 3178 04:32:03,860 --> 04:32:05,160 The last one was fascinating. 3179 04:32:06,080 --> 04:32:07,580 I mean, I personally, at three rivers, 3180 04:32:08,160 --> 04:32:10,420 had the experience of going through, like probably 3181 04:32:10,420 --> 04:32:14,680 in excess of 50 runs, and that, in the various cases 3182 04:32:14,680 --> 04:32:15,680 that we've gone through. 3183 04:32:17,920 --> 04:32:19,920 So, it's interesting perspective. 3184 04:32:19,920 --> 04:32:27,720 In the goalfield's presentation, if there's, I do have a land section that of what we're doing, 3185 04:32:28,260 --> 04:32:30,240 so I'm going to make a couple of comments there. 3186 04:32:31,420 --> 04:32:36,700 This is not the first time that I've come before the board to talk about the goalfields. 3187 04:32:37,160 --> 04:32:41,620 So in this particular case, what I'm going to do is I really try to consolidate my briefing 3188 04:32:41,620 --> 04:32:43,780 down to 12 flights. 3189 04:32:46,770 --> 04:32:50,850 Yeah, you've seen a lot before, yeah, I think that's right, Joe. 3190 04:32:51,710 --> 04:32:56,750 But the last time I was here was May 19th, 2017 on the goalfills. 3191 04:32:57,350 --> 04:33:00,030 We talked about the two-end year project somewhat there. 3192 04:33:01,330 --> 04:33:07,310 April 24th, I was here on 2015 and really talking about the 100 year project that we did 3193 04:33:07,310 --> 04:33:09,350 and even many times before that. 3194 04:33:09,350 --> 04:33:16,070 So, you've heard a lot, and I chose not to try to repeat all the slides, and I presume 3195 04:33:16,070 --> 04:33:19,110 you understand why we're out there. 3196 04:33:19,270 --> 04:33:20,470 Which button do I push? 3197 04:33:23,460 --> 04:33:23,720 Okay. 3198 04:33:25,300 --> 04:33:25,380 Good. 3199 04:33:25,640 --> 04:33:32,300 On this one here, I am going to talk about each one of these slides, some very briefly. 3200 04:33:33,200 --> 04:33:39,000 I really just chose to pull off the slides in your presentation for this presentation to 3201 04:33:39,000 --> 04:33:40,220 talk to key issues. 3202 04:33:40,220 --> 04:33:48,320 But I think the board wants to know about things like OMR and R, things about land, as to what we're doing. 3203 04:33:49,460 --> 04:33:56,240 And in our case here, some of the fascinating slides, I think, will be on the state plan of flight control. 3204 04:33:57,060 --> 04:34:04,000 And in the Sacramento River of flight control project and how do we actually attach what we're doing to those plans to those projects? 3205 04:34:04,860 --> 04:34:08,480 We do have a solution that I can share with you. 3206 04:34:10,500 --> 04:34:17,760 Okay, and this one briefly, the location, the red line that you see on there, well first 3207 04:34:17,760 --> 04:34:26,260 this is in Ube County, the black outline, a little hard to see, but it's the city of 3208 04:34:26,260 --> 04:34:30,000 Mary'sville, and that's the Ringlevy around the city of Mary'sville. 3209 04:34:30,500 --> 04:34:35,140 The Ube River is coming from the top of the screen down to the feather, and then the feather 3210 04:34:35,140 --> 04:34:39,140 heads on down towards Sacramento on it as such. 3211 04:34:39,820 --> 04:34:43,580 The end of the state plan of flight control in this area 3212 04:34:43,580 --> 04:34:48,700 is where the yellow line essentially hits the red line. 3213 04:34:49,440 --> 04:34:52,620 Endot right there is the state plan of flight control 3214 04:34:52,620 --> 04:34:54,460 that becomes critical for our project 3215 04:34:54,460 --> 04:34:58,460 where we struggled with in how we move forward on the project. 3216 04:35:00,280 --> 04:35:07,600 The on the little black dash lines that you see just at the end of the red line is the 3217 04:35:07,600 --> 04:35:08,520 goldfield area. 3218 04:35:09,420 --> 04:35:15,560 As I related to before, it's a 10,000 acre approximately, it's a mining area that was from the 3219 04:35:15,560 --> 04:35:22,160 dredged trailing that came before the U.V. river got moved to the north on it and as such. 3220 04:35:22,160 --> 04:35:39,600 That orange line isn't somewhat important in that I'll reference it in the future and one of the next slides, it's the 100 year interim solution that we put in to retain our FEMA accreditation and that's the location of that. 3221 04:35:39,740 --> 04:35:43,860 We built that within the goldfield area itself, per se. 3222 04:35:47,450 --> 04:35:49,370 Okay, just very briefly on background. 3223 04:35:49,870 --> 04:35:55,970 going to cover a lot of years on this. In 2010, not in this building, but in your other 3224 04:35:55,970 --> 04:36:02,130 building, resource building, I came. I listened to a core briefing on their GRR finding at 3225 04:36:02,130 --> 04:36:07,770 that time there was a lot of residents that were really kind of, now positive about what 3226 04:36:07,770 --> 04:36:12,730 we were trying to do for a flight control. And they really talked about the goalfields area 3227 04:36:12,730 --> 04:36:19,350 and having some issues with that. On it, the core did do some studies originally in the 3228 04:36:21,070 --> 04:36:28,430 GRR that went through, they ended up coming forward to the request, your previous board to 3229 04:36:28,430 --> 04:36:29,610 the court to give a briefing. 3230 04:36:30,570 --> 04:36:34,470 I mean, we're sitting in the audience listening to the briefing and hearing really for 3231 04:36:34,470 --> 04:36:40,630 the first time that our project was broken, that we had spent a whole bunch of money on to 3232 04:36:40,630 --> 04:36:46,590 put in the setback levies and everything else that we've done on it and at that point we ended 3233 04:36:46,590 --> 04:36:50,450 that starting this long saga of going forward. 3234 04:36:50,990 --> 04:36:57,510 So from 2010 to 2016 about we worked on feasibility studies. 3235 04:36:57,570 --> 04:37:03,770 I show you the various models and how we got there on the training walls he wrote 3236 04:37:03,770 --> 04:37:06,350 and breaking before in previous briefings. 3237 04:37:06,890 --> 04:37:14,110 We built a hundred year project to preserve the hundred year FEMA accreditation that we have. 3238 04:37:14,110 --> 04:37:24,250 And then we moved on to the 200-year project to put that project in, and that was that yellow line that you saw on it, that we have. 3239 04:37:25,110 --> 04:37:32,410 So the key for the 200-year project became not about trying to build levees or going forward with that. 3240 04:37:32,410 --> 04:37:40,810 I mean, we've done that a lot on it, and it re-prepared in Levy's two, and that it was really 3241 04:37:41,370 --> 04:37:47,990 that the location where we were was not within the state plan of flight control. 3242 04:37:49,190 --> 04:37:55,090 And that really presented a problem in that prop one of the funds that we were doing the project 3243 04:37:55,090 --> 04:38:01,130 under, and it's nice how funds, but we needed the way that legislation was written required 3244 04:38:01,130 --> 04:38:06,730 to step a path to put the project into the state plan of light control. 3245 04:38:07,870 --> 04:38:14,210 And that became really the nexus we had to overcome and work through how we're going to 3246 04:38:14,210 --> 04:38:14,930 do that. 3247 04:38:15,250 --> 04:38:18,830 And that really led down many different paths that we went through. 3248 04:38:19,590 --> 04:38:25,050 But we actually came to a solution and we're here now moving forward. 3249 04:38:25,870 --> 04:38:38,370 This slide shows you the project itself, that we have, up in the top left corner of the slide is where that red and yellow line hit before. 3250 04:38:38,830 --> 04:38:40,470 That's the end of the state plan of flight control. 3251 04:38:41,410 --> 04:38:44,030 We pivot from the end of the state right there. 3252 04:38:44,530 --> 04:38:50,630 The goalfield's project itself, just on the upper screen, going up, was always considered high ground. 3253 04:38:51,880 --> 04:39:04,420 And when the core did their hydraulic briefing in 2010, they established that it wasn't high ground that we had breakage and we're going to be flanked by flood flows. 3254 04:39:05,320 --> 04:39:07,880 So we've been working on to solve the problem. 3255 04:39:09,420 --> 04:39:14,880 So from that top left-hand corner you'll see the green line coming down. 3256 04:39:14,880 --> 04:39:26,500 It runs across property lines and then pivots on Hamilton Sparsville Road and goes up to a couple of miles to the end of the purple. 3257 04:39:26,880 --> 04:39:32,040 There is 2.6 miles of new levee that we're adding. 3258 04:39:32,580 --> 04:39:37,480 We have 2.2 miles of cutoff wall, 1.7 acres of seepage burns. 3259 04:39:37,480 --> 04:39:44,580 A thousand, we're going to degrade up in the top left-hand corner a little bit of the existing 3260 04:39:45,320 --> 04:39:52,320 levee that was built before for hydraulic reasons, we do that. 3261 04:39:52,980 --> 04:39:56,860 We have an interior drainage system that was built. 3262 04:39:57,600 --> 04:40:03,060 The low spot is in the lower corner and the screen where the two green lines come down 3263 04:40:03,060 --> 04:40:05,940 together and meet at the bottom of the screen. 3264 04:40:07,180 --> 04:40:13,540 That's a low spot where we need to have the new setback area be able to drain out. 3265 04:40:13,780 --> 04:40:20,500 So this blue area that you see behind, a series of 2D tension basins that were established 3266 04:40:20,500 --> 04:40:25,800 of which we will connect, we call it a causeway, a little small causeway. 3267 04:40:26,440 --> 04:40:32,400 Between the two, to allow the water to drain out, there will be an exit pipe that will come 3268 04:40:32,400 --> 04:40:37,240 I need the levy that's gated flat and controlled to allow the excess to come out. 3269 04:40:37,380 --> 04:40:42,260 I already 74 will maintain that and maintain the detention basis. 3270 04:40:43,940 --> 04:40:47,500 The levy is about 16 feet high, maximum height. 3271 04:40:48,020 --> 04:40:50,660 It has 20 foot crowns. 3272 04:40:51,360 --> 04:40:55,660 It's designed to ULDC criteria for 10200-year criteria. 3273 04:40:56,660 --> 04:41:01,780 It has the setback areas or the water side and landslide. 3274 04:41:01,780 --> 04:41:09,920 access quarters. And really importantly on the design that comes up is that we have this review 3275 04:41:09,920 --> 04:41:16,320 of the project goes to the state review. We have our independent review panel reviewing the project 3276 04:41:17,280 --> 04:41:30,100 and it's approved from their area access on it. I'll reference that point in the next slide coming 3277 04:41:30,100 --> 04:41:35,140 when I talk about how do we get to the state plan of flight control and what's happening 3278 04:41:35,140 --> 04:41:36,160 on that? 3279 04:41:39,940 --> 04:41:46,420 Let's go to land rights, the land that we're acquiring and then rights away. 3280 04:41:48,440 --> 04:41:58,760 This project acquires approximately 111 acres of property. We're acquiring all that property 3281 04:41:58,760 --> 04:42:09,080 in feet. Our funding agreement that we have with the state under Uber requires us to really acquire 3282 04:42:09,080 --> 04:42:16,480 in feet. And from our purpose, in all the time, I've gone through resolutions and working with people, 3283 04:42:18,220 --> 04:42:26,460 we've acquired our property with the prop one E funds in feet. The I have personally engaged in every 3284 04:42:26,460 --> 04:42:32,840 negotiation that we have, the tool of boarding delegates to me, the authority, the board has 3285 04:42:32,840 --> 04:42:38,300 a final authority, but I do engage with that with the people directly to try to work 3286 04:42:38,300 --> 04:42:44,780 through that and try to meet their needs and work through that on the property, but we have 3287 04:42:44,780 --> 04:42:47,560 acquired in feet on it. 3288 04:42:47,580 --> 04:42:53,500 So you won't be the first time, and not a surprise, you adopted the resolution, but we do 3289 04:42:53,500 --> 04:43:04,740 choir in fee. One of the prime reasons why we acquire in fee is that the property owners 3290 04:43:04,740 --> 04:43:10,920 have changed for us over time. They haven't always been the nice neighbors that you got 3291 04:43:10,920 --> 04:43:16,840 that you're working with on it. And in the future, the levees are going to be a little long time. 3292 04:43:17,820 --> 04:43:22,900 And as they go forward, there's an issue that's there that came up and we have dealt with those 3293 04:43:22,900 --> 04:43:28,000 before, where we couldn't get back on the wedding, even though we had an easement. 3294 04:43:28,920 --> 04:43:32,540 There was issues, and you don't really want that in that case. 3295 04:43:33,580 --> 04:43:36,960 So there are examples that would support that. 3296 04:43:37,320 --> 04:43:43,220 And we have built already an access easement for security reasons, allowing people to go back 3297 04:43:43,220 --> 04:43:49,460 to the properties that DWR did approve for us, where we had people that, along the western 3298 04:43:49,460 --> 04:43:56,000 of the Interceptor Canal had various similar issues about looking down and where the water was flowing 3299 04:43:56,000 --> 04:44:02,040 and having hundreds come in, where they can secure and monitor and patrol the road that they 3300 04:44:02,040 --> 04:44:10,480 want under that easement on it. And so I think there's a way to solve the problem as you work 3301 04:44:10,480 --> 04:44:14,360 through this. Now that the next bullet, 3302 04:44:16,400 --> 04:44:20,860 I think is important because this is something 3303 04:44:20,860 --> 04:44:28,980 that we, we looked at really hard, we're, it says, truly is not acquiring the flowage 3304 04:44:28,980 --> 04:44:36,940 easements for water side lands. We are acquiring the water side access quarter easements 3305 04:44:36,940 --> 04:44:41,320 and easements for that caused way in the detention basins. 3306 04:44:42,760 --> 04:44:47,160 But the land beyond that, behind the new levy that we're building, 3307 04:44:48,620 --> 04:44:53,520 up through the area behind on that previous map that you saw all the way to the river, 3308 04:44:54,920 --> 04:44:56,680 we're not putting a flowage he's went on. 3309 04:44:58,440 --> 04:44:59,980 And our ration... 3310 04:45:00,000 --> 04:45:21,140 Now for that, it's really kind of summarizing these five bullets that you see here is one of which is that there's already this huge mass of land between the levy that we've got the high ground that is currently being mined. It does breach, but it has to breach to do that. 3311 04:45:21,140 --> 04:45:26,260 Not a mile away, that's a lot of land-to-puted flowages, but I'm 3312 04:45:26,260 --> 04:45:28,740 plus you're putting it on paying for a flowage 3313 04:45:28,740 --> 04:45:31,680 management for all that land that's there. 3314 04:45:32,720 --> 04:45:36,860 The ground is already highly saturated during what weather. 3315 04:45:37,260 --> 04:45:40,300 There's studies out there that the crops that are growing, the roots 3316 04:45:40,300 --> 04:45:44,240 already are damaged from crops and orchards that are out there. 3317 04:45:45,160 --> 04:45:49,020 The other area that's being used behind the levy is a mining area. 3318 04:45:49,020 --> 04:45:51,420 and they basically stopped their operations 3319 04:45:51,420 --> 04:45:53,080 and then was high water conditions. 3320 04:45:54,600 --> 04:45:55,840 So we elected that. 3321 04:45:56,000 --> 04:45:58,980 Licked at the cost is there really need 3322 04:45:58,980 --> 04:46:01,020 to put a flowage he's went back there. 3323 04:46:01,680 --> 04:46:02,860 We prepared a tech memo. 3324 04:46:03,120 --> 04:46:07,000 We had legal, a pracer, and technical input 3325 04:46:07,000 --> 04:46:08,280 into the tech memo. 3326 04:46:08,420 --> 04:46:09,340 We have submitted it. 3327 04:46:09,340 --> 04:46:12,220 We provided it to the various reviewers. 3328 04:46:13,020 --> 04:46:16,620 DWR has responded back to us. 3329 04:46:16,620 --> 04:46:22,560 And they concurred with our conclusion, recognizing that you guys have control with your permits in that. 3330 04:46:22,600 --> 04:46:30,160 But that we have concurred by DWR because of funding requirements as to where they are on our project. 3331 04:46:30,900 --> 04:46:33,060 They thought our logic was pretty good. 3332 04:46:33,600 --> 04:46:41,040 When you issue us our permit, our recommendation is you don't require a flow of Gs1. 3333 04:46:41,700 --> 04:46:51,520 And this is an informational briefing that we have, you have the check memo, I think it's kind of not a well spent money. 3334 04:46:52,100 --> 04:47:08,360 Plus I do not know how to define that area that a flowage management would go on other than the entire area out there and that's literally thousands of acres that I don't know what the benefit would be to put a flowage management. 3335 04:47:08,360 --> 04:47:12,020 How do you define it as we go forward? 3336 04:47:15,360 --> 04:47:15,900 Okay, funding. 3337 04:47:17,620 --> 04:47:18,960 We are fully funded. 3338 04:47:20,220 --> 04:47:23,080 The funds from the state are prop 1E. 3339 04:47:23,920 --> 04:47:27,220 Right now our estimate is around 53 million, 3340 04:47:27,860 --> 04:47:28,760 million dollars. 3341 04:47:29,080 --> 04:47:33,700 And we have from state funding somewhere around 42 million 3342 04:47:33,700 --> 04:47:35,760 the less is the rest is local. 3343 04:47:36,360 --> 04:47:40,320 We'll do our best to try to make that a smaller number 3344 04:47:40,320 --> 04:47:42,600 as we go forward and we can serve money. 3345 04:47:44,400 --> 04:47:47,020 The funding is that it comes from the 3346 04:47:47,020 --> 04:47:49,220 Oofur funding agreement that we have, 3347 04:47:49,240 --> 04:47:51,980 and there's two key things in that Oofur funding agreement. 3348 04:47:52,700 --> 04:47:58,660 One is that we identify a path for the project to be added to the state plan of 3349 04:47:58,660 --> 04:48:01,060 flight control, and we've done that and I'll explain that. 3350 04:48:01,380 --> 04:48:04,120 It also requires an OMR and R agreement, 3351 04:48:04,560 --> 04:48:08,680 and we're in the process of going through those steps too. 3352 04:48:10,960 --> 04:48:12,960 On OMR and R, 3353 04:48:16,760 --> 04:48:26,120 the Rd704 is the main LOMA in the area that does the service for this area that we've been maintaining and proving. 3354 04:48:27,440 --> 04:48:31,120 The district recently has expanded their district. 3355 04:48:31,940 --> 04:48:39,660 They went through a benefit assessment election and they've expanded. 3356 04:48:39,660 --> 04:48:44,200 So they now included the goals area into their district. 3357 04:48:45,400 --> 04:48:49,060 They also, same time, expanded their district to match the 3358 04:48:49,060 --> 04:48:54,920 trilla zone that we've had, of area that we've protected and how we've 3359 04:48:54,920 --> 04:48:56,940 collected resources in the past. 3360 04:48:57,520 --> 04:49:02,420 We've actually put our trilla assessment in a bans, because the 3361 04:49:02,420 --> 04:49:07,680 RD-74 assessment is now in place, that covers the same area that we have on 3362 04:49:07,680 --> 04:49:31,680 And now, a large part of the 74 system, I mentioned this, because this is kind of the connection to our project and what we're talking about here is last meeting, you all talked about our own M system and the core did approve or delegate to 3363 04:49:31,680 --> 04:49:37,740 to RD-7-84, or back to the federal system on the O&M. 3364 04:49:38,660 --> 04:49:40,900 And Rick Ryan Hart was here and he gave you a talk, 3365 04:49:41,640 --> 04:49:43,400 and that was good. 3366 04:49:43,720 --> 04:49:46,260 And that was a significant thing that happened. 3367 04:49:47,560 --> 04:49:50,760 So really, most of our system is already in the system. 3368 04:49:51,860 --> 04:49:53,900 Now it's actually in the federal system. 3369 04:49:54,740 --> 04:49:59,100 I mentioned to the board on a third bullet, which is really key, 3370 04:49:59,100 --> 04:50:03,300 is that Trilla and Artis 74 and the Board of Art 3371 04:50:03,300 --> 04:50:06,580 entered into at least a couple OMR and Artigreements. 3372 04:50:07,980 --> 04:50:10,120 There's one because the first one got combined 3373 04:50:10,120 --> 04:50:14,380 in the second one in 2011, that entire red area 3374 04:50:14,380 --> 04:50:18,340 that you saw last meeting and went through the 29 miles 3375 04:50:18,340 --> 04:50:21,020 except for the goals field, it already has an agreement 3376 04:50:22,160 --> 04:50:25,640 that we said that we do OMR and Art on. 3377 04:50:25,640 --> 04:50:35,440 So we're there, we submitted a draft for this next area to go forward and we plan to 3378 04:50:35,440 --> 04:50:41,440 finalize and execute that agreement when the construction is done. 3379 04:50:41,660 --> 04:50:46,720 That's when we actually know what the project is and what we'll put into the agreement. 3380 04:50:47,540 --> 04:50:48,840 And that's our timing for that. 3381 04:50:48,840 --> 04:50:53,120 But I think our commitment to doing the OMR and our 3382 04:50:53,120 --> 04:50:57,280 and agreeing to it is well-established and in place. 3383 04:51:02,170 --> 04:51:02,170 OK, 3384 04:51:04,430 --> 04:51:06,910 state plan, flood control, and the Sacramento River 3385 04:51:06,910 --> 04:51:08,490 flood control project. 3386 04:51:10,870 --> 04:51:15,110 I mentioned earlier, we liked that a whole bunch of different options. 3387 04:51:16,430 --> 04:51:19,330 Along the way of looking at all those options, 3388 04:51:19,330 --> 04:51:26,970 Three rivers did take the step to go and work on what we call it the time plan B. 3389 04:51:28,330 --> 04:51:36,670 We acquired a lobbyist and we went to work with the folks and we're able to get 3390 04:51:36,670 --> 04:51:44,510 within Word of 2018 words that say that the work that we're doing on this new 3391 04:51:47,030 --> 04:51:48,110 is authorized. 3392 04:51:49,570 --> 04:51:59,710 And so it's section 1305 and Word allows us to go and build the project and be authorized. 3393 04:52:00,190 --> 04:52:01,570 Now that's really good. 3394 04:52:01,690 --> 04:52:05,810 I mean, it allowed us to go to high ground to fix the problem. 3395 04:52:05,930 --> 04:52:07,190 That's what we wanted to do. 3396 04:52:07,390 --> 04:52:11,010 We didn't ask for any money at all. 3397 04:52:11,010 --> 04:52:16,330 on it, we just needed to be able to go and fix it. 3398 04:52:16,790 --> 04:52:20,550 And that's all it says, really, essentially on it. 3399 04:52:20,790 --> 04:52:27,430 But I did present some really odd things, 3400 04:52:28,470 --> 04:52:32,590 because having the endpoint kind of already established, 3401 04:52:33,090 --> 04:52:36,610 being okay, how do we get there? 3402 04:52:37,310 --> 04:52:40,070 On it, it became really the difficulty, 3403 04:52:40,070 --> 04:52:41,870 and we work through that. 3404 04:52:42,690 --> 04:52:44,870 It was a difficulty from a board. 3405 04:52:45,350 --> 04:52:47,310 How do you add it to the state plan? 3406 04:52:47,490 --> 04:52:48,890 What happens to the SRCP? 3407 04:52:50,610 --> 04:52:55,250 Since there was no 408, we're already authorized. 3408 04:52:57,750 --> 04:53:03,210 Then what happens to that process in this as we move forward? 3409 04:53:04,370 --> 04:53:06,850 And there was no typical partnering agreement 3410 04:53:06,850 --> 04:53:15,990 between us and the core, that presented a problem for us because we couldn't actually transfer 3411 04:53:17,070 --> 04:53:21,270 money on it to engage with them on the project. 3412 04:53:21,870 --> 04:53:25,170 Meanwhile, we're moving on, building trying to get the project built. 3413 04:53:27,410 --> 04:53:31,670 So the core involvement has been limited, not that we haven't talked to them, but it's 3414 04:53:31,670 --> 04:53:33,490 been limited on the project. 3415 04:53:33,490 --> 04:53:39,510 And that's why I really gave an emphasis before about the design review of what we had on our project today. 3416 04:53:40,950 --> 04:53:48,950 With our independent review team, our various engineers and what we're doing in the state and the state engineers looking at it. 3417 04:53:48,950 --> 04:53:50,510 I think we're ready to go. 3418 04:53:53,090 --> 04:53:54,110 This is a solution. 3419 04:54:03,310 --> 04:54:05,430 We have word of 2018 in place. 3420 04:54:06,530 --> 04:54:09,450 It's an already establishes that we're authorized. 3421 04:54:09,450 --> 04:54:18,970 We have met with the core, we have met with DWR in your board staff and talk through this as to how do we go through. 3422 04:54:19,610 --> 04:54:25,130 So these five steps in very simplistic terms is how we get to the end. 3423 04:54:26,130 --> 04:54:30,150 First, you guys issue the permit to us to construct. 3424 04:54:31,030 --> 04:54:35,030 When you're issuing the permit, we think that you'll send your letter to the core. 3425 04:54:35,030 --> 04:54:40,020 The court's already Ryan is here, and he can talk to it from the court too, is that 3426 04:54:41,150 --> 04:54:46,930 undoubtedly, you'll send you a 408 or some letter to the court, they'll respond saying 408's 3427 04:54:46,930 --> 04:54:54,630 not needed on it to go forward. But you issue your permit, I think you need to do that because of the 3428 04:54:54,630 --> 04:55:01,690 state requirements, and we really want to be able to follow the plan and the rules and have you 3429 04:55:01,690 --> 04:55:06,770 engage with that same construction and over to see the project with us. As we go forward. 3430 04:55:07,970 --> 04:55:16,250 We'll construct the project and start to build it. Later on I have a schedule for you to go forward. 3431 04:55:18,210 --> 04:55:24,170 Concernantly, Trilla enters into a cost sharing agreement and we're doing that right now. We got 3432 04:55:24,170 --> 04:55:31,070 a template. The core did respond to say use 1305, some template, so we created the template with them. 3433 04:55:31,690 --> 04:55:39,310 and how that is. And we have several drafts, and we'll be providing them some money to be able to participate with us. 3434 04:55:40,190 --> 04:55:46,530 But concurrently, we'll enter into a cost sharing agreement with the core for review of the project 3435 04:55:46,530 --> 04:55:57,550 and processing of the amendment to the 1953 MOU. That's important on it. Now, that is going to happen. 3436 04:55:57,550 --> 04:56:04,910 We'll sign the agreement, hopefully, in coming months on it, but it's not critical to building the project. 3437 04:56:05,370 --> 04:56:12,010 It's not a critical for you to go forward and not issue the permit, but do issue that our encroachment permit. 3438 04:56:14,320 --> 04:56:15,440 Following construction, 3439 04:56:18,240 --> 04:56:23,720 we will complete a construction report and a draft federal O&M manual. 3440 04:56:23,720 --> 04:56:31,000 revisions will be sent out just like before when the core got their manuals before and then they 3441 04:56:31,000 --> 04:56:35,400 sent it back and and said that the Rd704 will take over on the system. 3442 04:56:37,740 --> 04:56:39,220 The final bullet is where 3443 04:56:39,220 --> 04:56:47,120 you give your assurances and is added to the state plan. Is the levies built, the core will have done 3444 04:56:47,120 --> 04:56:52,680 their review when they see RCCR. If we get the documents done sooner with the funding agreement, 3445 04:56:52,680 --> 04:56:55,800 and they can participate, that's great on it. 3446 04:56:56,000 --> 04:56:58,800 But we will build the levee, we'll go through, 3447 04:56:59,020 --> 04:57:03,200 we'll give them the manuals, the core or review, 3448 04:57:03,360 --> 04:57:04,900 the post-construction information, 3449 04:57:05,520 --> 04:57:07,220 and works for the Central Life Flood Board 3450 04:57:07,220 --> 04:57:10,200 to execute an amendment to the 1953 MOU. 3451 04:57:12,380 --> 04:57:14,900 1305, that section says that's one of the things 3452 04:57:14,900 --> 04:57:18,620 that we need to do in that legislation 3453 04:57:18,620 --> 04:57:22,360 was to amend the 1953 MLU. 3454 04:57:24,440 --> 04:57:29,180 And that's where the board provides your assurances in that amendment. 3455 04:57:30,760 --> 04:57:35,280 And issues revised unit 145 O&M manual. 3456 04:57:35,600 --> 04:57:37,340 That's what you dealt with last meeting. 3457 04:57:37,620 --> 04:57:41,800 The O&M manual supplement officially accepting 3458 04:57:41,800 --> 04:57:44,540 the work into the state plan of flight control 3459 04:57:44,540 --> 04:57:47,860 and the Sacramento River flood control project. 3460 04:57:50,820 --> 04:57:56,860 So it's unusual, but I think it works on it. 3461 04:57:57,720 --> 04:58:00,060 And that's what we're proceeding with. 3462 04:58:00,580 --> 04:58:02,000 And on our project. 3463 04:58:02,720 --> 04:58:04,700 I have one question. Sorry. 3464 04:58:04,920 --> 04:58:05,280 Can I have a present? 3465 04:58:05,780 --> 04:58:05,860 Yeah. 3466 04:58:07,200 --> 04:58:08,100 The first bullet? 3467 04:58:09,160 --> 04:58:11,280 Where you encroaching upon? 3468 04:58:13,730 --> 04:58:14,970 There's no state plan of flood control. 3469 04:58:20,770 --> 04:58:27,470 I hope you're asking someone else to. 3470 04:58:28,030 --> 04:58:30,390 Anybody who would like to answer would be welcome. 3471 04:58:31,990 --> 04:58:36,210 There was a discussion internally as we went through 3472 04:58:36,210 --> 04:58:42,390 as does the board need to issue a permit on it. 3473 04:58:42,390 --> 04:58:50,970 And I think as we go forward, and the mechanism moving forward in establishing your criteria, 3474 04:58:53,410 --> 04:58:58,250 your encroachment permit is the vehicle that you use for levee construction. 3475 04:58:59,130 --> 04:59:00,550 You call it encroachment permit. 3476 04:59:00,890 --> 04:59:07,350 So in this aspect, maybe the tie in the connection, you have to connect to the levee is probably 3477 04:59:07,350 --> 04:59:08,190 the closest thing. 3478 04:59:08,390 --> 04:59:08,590 That? 3479 04:59:08,910 --> 04:59:09,270 I get that. 3480 04:59:09,470 --> 04:59:09,670 Okay. 3481 04:59:09,670 --> 04:59:14,650 Thank you. Thank you, Joe. Sure. That's Joe. I think you answer my second question, which is the 3482 04:59:14,650 --> 04:59:19,410 kosher agreement. I wasn't sure how that link was. Maybe you said that language is in the 3483 04:59:19,410 --> 04:59:28,230 federal authorization. It says the link to the 1953 agreement. You said that's in the federal 3484 04:59:28,230 --> 04:59:33,470 authorization. It says that we need to modify the 1953 which is my second question which is 3485 04:59:33,470 --> 04:59:38,310 the other bullet about how you guys are doing the kosher agreement. So that explains there is no kosher 3486 04:59:38,310 --> 04:59:47,390 Right, but in that federal authorization language, the core has a connection and you're paying them to review it for the legislation. 3487 04:59:49,530 --> 04:59:50,130 Essentially. 3488 04:59:50,570 --> 04:59:51,630 Okay, that's good enough. 3489 04:59:52,070 --> 04:59:52,370 Thank you. 3490 04:59:53,150 --> 04:59:53,450 Thank you. 3491 04:59:53,450 --> 04:59:59,110 Follow us that payment to have the core do work on it as part of the local share. 3492 05:00:01,420 --> 05:00:08,400 Or is that an addition just money to get them started and has nothing to do with the cost share? 3493 05:00:08,800 --> 05:00:18,420 You know, I, you know, I haven't actually thought about that so much. As to as a part of the local share, I don't think it will be huge. I was just cutting a check and sending it. 3494 05:00:19,020 --> 05:00:27,460 You know, when the agreement was done and I'll sit down and talk to the DWR folks about where it is. I'm, I'm just really happy that we have a path. 3495 05:00:27,460 --> 05:00:35,220 No, no, that's is that I was just wondering whether you know what that total local cost is going to be 3496 05:00:36,620 --> 05:00:47,480 And if that's part of it because you're going to have to put up some money for the court or even start work on it, right? 3497 05:00:47,820 --> 05:00:55,720 Well, yeah, I would imagine when we finally work through this agreement 3498 05:00:56,500 --> 05:01:02,880 for the court to be involved, it'll be a cost share, or a cost that we'll put into that. 3499 05:01:02,900 --> 05:01:07,840 Not as that cost share start off and I know it's different depending on land season. 3500 05:01:08,020 --> 05:01:08,640 It's a very choice. 3501 05:01:09,080 --> 05:01:12,340 But does that start off the usual 65? 3502 05:01:13,840 --> 05:01:14,080 No. 3503 05:01:14,460 --> 05:01:14,680 No. 3504 05:01:15,380 --> 05:01:16,160 That's right. 3505 05:01:16,200 --> 05:01:16,840 That's okay. 3506 05:01:17,160 --> 05:01:17,380 No. 3507 05:01:17,500 --> 05:01:19,440 I think this is a direct cost. 3508 05:01:19,920 --> 05:01:21,120 Not a cost sharing. 3509 05:01:21,120 --> 05:01:28,360 It's really word-grying that we want the core to be involved and they'll provide a number. 3510 05:01:29,480 --> 05:01:34,260 And we'll look at that and agree with it, Ryan, what do you want to talk about? 3511 05:01:34,440 --> 05:01:39,260 This is, no, I was just going to say, this is what we did on the Stockton Project. 3512 05:01:39,760 --> 05:01:46,780 Back in the day, when the San Joaquin County flood district went ahead with improving 3513 05:01:46,780 --> 05:01:50,520 and the Mormons flew and Bear Creek and all of that. 3514 05:01:51,260 --> 05:01:54,260 They went ahead without any federal money 3515 05:01:55,020 --> 05:01:58,700 and paid the core to review the plans and specs 3516 05:01:58,700 --> 05:02:01,260 to the extent their federal requirements. 3517 05:02:01,740 --> 05:02:03,060 And that was just local money 3518 05:02:03,060 --> 05:02:04,820 had nothing to do with the cost share. 3519 05:02:05,220 --> 05:02:07,180 Because I think eventually later, 3520 05:02:07,380 --> 05:02:10,400 they went and got authorization to try to get some reimbursement. 3521 05:02:10,620 --> 05:02:12,220 But initially for the construction, 3522 05:02:12,920 --> 05:02:15,540 they went ahead with local and state money. 3523 05:02:15,540 --> 05:02:20,160 Okay. So then is there a cost share between the state and the local? 3524 05:02:21,180 --> 05:02:26,820 Yeah, it's like an EIP. Yeah, we have the U for funding agreement. Yeah, okay. So the 3525 05:02:27,380 --> 05:02:33,860 I would imagine that the whatever we have the cost that we provide for that review for 3526 05:02:33,860 --> 05:02:38,940 participation would probably be cost shared. But I haven't had that direct discussion with them. 3527 05:02:38,940 --> 05:02:42,900 Okay, that would be with DWR. Yes. Okay. So the 3528 05:02:43,480 --> 05:02:54,260 So, the cost share agreement, then the normal thing that we look at is between you, it'd be like an EIP agreement, right? 3529 05:02:54,660 --> 05:02:55,600 Because there isn't any. 3530 05:02:56,520 --> 05:02:56,640 Yeah. 3531 05:02:57,200 --> 05:02:57,440 Yeah. 3532 05:02:57,600 --> 05:02:57,780 Yeah. 3533 05:02:57,780 --> 05:02:58,120 Yeah. 3534 05:02:58,400 --> 05:02:58,480 Yeah. 3535 05:02:58,480 --> 05:02:58,520 Yeah. 3536 05:02:59,040 --> 05:02:59,160 Yeah. 3537 05:02:59,160 --> 05:03:06,740 In us in DWR, our previous work, up to this project, was done under those early implementation 3538 05:03:06,740 --> 05:03:07,340 projects. 3539 05:03:08,460 --> 05:03:16,420 The goal-fills project is one of these UFER urban funding agreements that transcended EIP. 3540 05:03:17,120 --> 05:03:27,780 That was a different, so is that a different, original number then, is that a new 3541 05:03:27,780 --> 05:03:33,120 for project is separate and completely apart from the OBIP. 3542 05:03:33,740 --> 05:03:35,500 Yeah, it's a stand alone. 3543 05:03:35,520 --> 05:03:36,320 Stand alone. 3544 05:03:36,860 --> 05:03:42,440 Yeah, it's my earlier slide when I gave the funding, 3545 05:03:43,340 --> 05:03:49,060 DWR, participate with us, a card dot, and dedicated X amount of money. 3546 05:03:49,180 --> 05:03:53,600 I think it's the 42 million that I showed on the slide for the project, 3547 05:03:54,260 --> 05:03:59,480 based upon our project costs, and it's all prop one E, but it's under that funding agreement 3548 05:03:59,480 --> 05:04:04,600 has nothing to do with the EIP projects that we have. 3549 05:04:04,940 --> 05:04:06,840 Okay, any other questions for Paul? 3550 05:04:07,220 --> 05:04:08,500 Well, I got two more slides. 3551 05:04:09,680 --> 05:04:10,400 This is our schedule. 3552 05:04:13,900 --> 05:04:14,760 On it. 3553 05:04:15,780 --> 05:04:22,100 And we plan to, I mean, we're moving. 3554 05:04:22,100 --> 05:04:45,440 I mean, a lot of this is based upon property funds on it and the to do and I mean the shelf life of property funds are running out on it and the so we've been pressing really hard to to move forward on the real estate acquisitions we were moving. 3555 05:04:45,440 --> 05:04:52,620 We have like 12 properties, we're relocating nine of the people that have lived there long 3556 05:04:52,620 --> 05:05:00,420 long time, probably over 40 years on it, and that's difficult to do, but we're working 3557 05:05:00,420 --> 05:05:01,320 with them. 3558 05:05:01,540 --> 05:05:10,660 One more to do, and to finalize for the deal, and that'll happen, and we'll consummate 3559 05:05:10,660 --> 05:05:14,340 all those escrow deals, get the people relocated out. 3560 05:05:14,980 --> 05:05:18,160 We anticipate the bulldozers hit the ground in May. 3561 05:05:18,400 --> 05:05:18,780 Oh, wait. 3562 05:05:20,800 --> 05:05:24,360 And one of the things we need to do is the encroachment permit. 3563 05:05:24,460 --> 05:05:28,520 And I think we worked out the details to do that. 3564 05:05:30,080 --> 05:05:32,060 And we're ready to go. 3565 05:05:32,360 --> 05:05:33,500 Seek was done. 3566 05:05:34,280 --> 05:05:36,260 We went through one lawsuit before. 3567 05:05:36,420 --> 05:05:38,100 We had that long thing going through 3568 05:05:38,100 --> 05:05:44,660 about going straight through a mining area and then we had to re-kink the levee or redo the levee. 3569 05:05:44,700 --> 05:05:47,420 That's one of the briefings to show that I talked about before. 3570 05:05:48,760 --> 05:05:50,480 But we've done all that. 3571 05:05:50,560 --> 05:05:55,160 We have 100% design drawings out for finalization for review. 3572 05:05:56,780 --> 05:06:03,260 And we plan to go out, go to my full board on February 18th, 3573 05:06:03,300 --> 05:06:04,920 ask for authorization to go to bed. 3574 05:06:04,920 --> 05:06:10,580 But we'll plan to send them out the next day and open it in early April. 3575 05:06:11,540 --> 05:06:17,120 Depending upon what the bid say, hopefully we have good bids on it, we'll let you notice 3576 05:06:17,120 --> 05:06:18,660 the proceed and press. 3577 05:06:19,500 --> 05:06:25,480 We expected to be a one-year construction zone, a time period, on it, I might slide somewhat 3578 05:06:26,180 --> 05:06:27,140 hopefully not. 3579 05:06:28,060 --> 05:06:33,640 And then that'll mark a really major milestones for at least Trilla and Rd-7A4. 3580 05:06:34,920 --> 05:06:48,460 This project is the final project for the RD704 improvements that we needed to do to get to 200 year and 100 year improvements for the entire system. 3581 05:06:50,200 --> 05:06:53,380 That doesn't mean that Trilla goes away or wherever you are. 3582 05:06:53,640 --> 05:06:57,500 I probably will be back talking to you about other things that we're doing. 3583 05:06:57,500 --> 05:07:10,720 You would county and others have asked us to go work in other parts of you, but county on different types of efforts for flight control, so we'll most likely be back in other projects to talk to you about them. 3584 05:07:11,140 --> 05:07:14,860 But with that, that's the end. 3585 05:07:16,100 --> 05:07:20,500 Thank you, Paul. That's creative, Clyde. 3586 05:07:25,880 --> 05:07:38,040 I have one concern and I think it's in its its the liability issue kind of of, you know, does the state take additional liability in. 3587 05:07:39,120 --> 05:07:41,160 And that's always been a worry of mine. 3588 05:07:42,560 --> 05:08:08,160 Anyway, but specifically for this, for your project, so you're going to build, you've got the gold fields kind of out there, and you're going to build this wall like this, and you're acknowledging that if a big flood comes, you could be flooding a very large area, and you're not buying flood easements for. 3589 05:08:09,560 --> 05:08:15,820 So those people then could come back and say, well, you, you know, you flooded me. 3590 05:08:15,980 --> 05:08:17,360 I didn't flood before. 3591 05:08:17,480 --> 05:08:26,040 Now you flooded me and somebody has to, somebody has to pick up that, that lawsuit and 3592 05:08:26,040 --> 05:08:33,160 the state under your proposal will have given assurances to the core. 3593 05:08:33,960 --> 05:08:34,340 Is that right? 3594 05:08:34,880 --> 05:08:36,500 We're giving assurances to the core. 3595 05:08:36,500 --> 05:08:43,860 You're giving a sure, I mean just standard thing, you give assurances to us, we give assurances to the core, or are there no assurances? 3596 05:08:45,640 --> 05:08:55,080 Well, you're giving assurances to the core on the lobby system that is typical, I mean that's, I mean nothing's changed. 3597 05:08:55,080 --> 05:09:07,360 The point, I put this map back up on the screen here, is the on the flowagesman on the land or water side of the levee. 3598 05:09:07,460 --> 05:09:17,120 The area that's behind that yellow line looking to the top of the screen to the north is really uninhabited. 3599 05:09:17,120 --> 05:09:21,220 There aren't homes in that there's mining companies that are mining. 3600 05:09:22,560 --> 05:09:27,620 There's a large area in that dashed area that you see that is actively, 3601 05:09:28,380 --> 05:09:32,760 you would goal fields that are people are dredging. 3602 05:09:33,220 --> 05:09:34,240 They still can dredge. 3603 05:09:34,380 --> 05:09:35,740 They can do various things. 3604 05:09:36,300 --> 05:09:37,740 They're like temporary facilities. 3605 05:09:39,000 --> 05:09:42,760 The couple homes, there's nine locations. 3606 05:09:42,760 --> 05:09:55,960 most of them are clustered along Hamilton Smart's full road that we're relocating out from that and on the map that we had, I'm going to turn to the project map here real quick. 3607 05:09:57,480 --> 05:10:09,200 The one detention, it's a triangle to the right of the screen, that blue area. That's where about eight of the homes are that we're relocating. 3608 05:10:09,200 --> 05:10:15,340 That becomes a detention basin that we dig out and we're going to use the dirt for the 3609 05:10:15,340 --> 05:10:16,180 levee. 3610 05:10:16,880 --> 05:10:18,780 So we're relocating them. 3611 05:10:18,980 --> 05:10:20,700 No one's going to live behind the levee. 3612 05:10:20,820 --> 05:10:26,900 There's another resident that lives on Brophy Road by the other detention basin that we're 3613 05:10:26,900 --> 05:10:28,560 relocating out of the area too. 3614 05:10:28,840 --> 05:10:30,580 So no one will live there. 3615 05:10:31,820 --> 05:10:37,740 The threat to the people behind the levee is really a mining operation. 3616 05:10:38,720 --> 05:10:53,800 And some orchards that are there in the orchards that are behind the levy today already are impacted, even without the levy being built by high groundwater. 3617 05:10:55,040 --> 05:11:01,320 When the Uba River comes up, the top soil up to ground level is saturated. 3618 05:11:02,140 --> 05:11:08,100 It's, and sometimes in historical studies comes out of the ground and causes like a foot 3619 05:11:08,100 --> 05:11:13,660 ponds that are sitting out there, just from high groundwater for the U.V. river influencing 3620 05:11:13,660 --> 05:11:15,560 this very porous soil. 3621 05:11:16,420 --> 05:11:21,000 So it already impacts, and there's been lots, lots, it's about impacts of orchards and 3622 05:11:21,000 --> 05:11:27,700 damages to them already and on it, and so we looked at that and concluded, why would we 3623 05:11:27,700 --> 05:11:36,200 give a flow of achievement over this area and pay the additional money for the Kizia and a 3624 05:11:36,200 --> 05:11:43,380 flow of achievement in this case. The discussion that you had last discussion, it most likely 3625 05:11:43,380 --> 05:11:50,640 will rain somewhere around maybe 80 to 95 percent of the property. If the person's already damaged 3626 05:11:50,640 --> 05:11:57,200 on an orchard and you're going to pay them 95% of that property value to keep on farming 3627 05:11:58,300 --> 05:12:03,880 additional and he's already damaged anymore. Why would you do that? That was our conclusion. 3628 05:12:05,280 --> 05:12:08,560 So we put together the memo and it's turning it in. I don't think you have additional 3629 05:12:08,560 --> 05:12:17,100 liability on it and as such and so within your staff review and you look at our permit 3630 05:12:17,100 --> 05:12:21,540 to issue, that's your question, you know, one of the questions that comes that we raise. 3631 05:12:21,700 --> 05:12:22,740 We don't think you need it. 3632 05:12:22,740 --> 05:12:29,340 And I pointed out here is that as you put together our permit, then you should consider 3633 05:12:29,340 --> 05:12:29,900 that. 3634 05:12:30,260 --> 05:12:31,720 We don't think you need it. 3635 05:12:38,730 --> 05:12:42,010 The liability issues and talk with DWR. 3636 05:12:42,470 --> 05:12:43,330 Yeah, absolutely. 3637 05:12:43,850 --> 05:12:51,110 But I think they have our check memo already on it and our explanation where we had and we sat down 3638 05:12:51,110 --> 05:12:59,030 through it with them. But it's just a night in that you need to consider. And if you do 3639 05:12:59,030 --> 05:13:03,970 end up putting it there, then that does have a cost consequence. And where do we put 3640 05:13:03,970 --> 05:13:09,610 it consequence? Because I don't know where to put it. One could lay it out over thousands of 3641 05:13:09,610 --> 05:13:15,130 it. I don't know where to get the money to do that. And then it drives the conclusion if you 3642 05:13:15,130 --> 05:13:25,290 need it. Be really need it. As we go forward. Additional questions? Anything else from board? 3643 05:13:25,830 --> 05:13:31,910 Okay, thanks Paul. How come the levees are 16 feet high? 3644 05:13:34,580 --> 05:13:36,940 Well, I'll try to make it really. 3645 05:13:36,940 --> 05:13:44,060 Well, when we connect to the existing levy, it's almost 16 feet there on the upper 3646 05:13:44,060 --> 05:13:44,900 U.B. 3647 05:13:45,100 --> 05:13:57,020 There's also, as we look to the water levels and that we, with the un, there's a lot of uncertainty 3648 05:13:57,020 --> 05:13:58,520 with the goal fields. 3649 05:13:59,480 --> 05:14:03,940 As to where we are, so as we went through our hydraulic modeling and all that, 3650 05:14:03,940 --> 05:14:09,880 M. B. K. did do a conservative analysis as to what that water surface level should be. 3651 05:14:10,280 --> 05:14:15,800 And they came up with a 200 year level and then placed a conservative nature into that. 3652 05:14:16,240 --> 05:14:21,500 That gave us an additional buffer in case something happens within the goal pills that we can adjust. 3653 05:14:22,200 --> 05:14:25,440 Which then added up to the 16 feet with the free board. 3654 05:14:28,640 --> 05:14:29,820 It seems very high. 3655 05:14:31,440 --> 05:14:32,380 All right. Thank you. 3656 05:14:32,560 --> 05:14:33,260 Thank you, Paul. 3657 05:14:34,760 --> 05:14:38,660 Okay, let's move on and finish this up. 3658 05:14:40,410 --> 05:14:42,190 Executive officers report. 3659 05:14:42,510 --> 05:14:46,230 We have the usual update reports on administration, 3660 05:14:46,870 --> 05:14:51,650 so on Leslie's executive officers report you want to. 3661 05:14:51,730 --> 05:14:55,190 I just have one thing to add that came into late to make it to the report, 3662 05:14:55,370 --> 05:14:59,990 and I want to give Kudos to Greg, who's sitting in the audience for making it. 3663 05:15:00,000 --> 05:15:09,440 I think this happened. Michael, do you want to do the honors? I can just tell you. We had our 3664 05:15:09,440 --> 05:15:15,300 damn emergency action plan approved. I think it might be the first one in the nation or whatever, 3665 05:15:15,380 --> 05:15:21,720 at least in California, but is it? Yes. So, through diligence and returning it multiple times, 3666 05:15:21,920 --> 05:15:28,260 through multiple people making thousands of comments, he was able to get it through, and we just 3667 05:15:28,260 --> 05:15:30,480 and have an opportunity to put it in the end. 3668 05:15:30,640 --> 05:15:30,960 Report. 3669 05:15:31,360 --> 05:15:32,360 Nice job, great. 3670 05:15:34,060 --> 05:15:34,320 OK. 3671 05:15:36,100 --> 05:15:40,040 OK, thanks to the staff for those reports. 3672 05:15:40,640 --> 05:15:41,840 They're very helpful. 3673 05:15:42,260 --> 05:15:43,960 Any comments from the board? 3674 05:15:44,580 --> 05:15:44,760 Tim? 3675 05:15:45,700 --> 05:15:46,220 Go. 3676 05:15:47,920 --> 05:15:49,120 The Clyde? 3677 05:15:49,520 --> 05:15:49,560 Jay? 3678 05:15:51,200 --> 05:15:51,680 Yes. 3679 05:15:52,380 --> 05:15:54,280 Board member McDonald and I. 3680 05:15:54,520 --> 05:15:57,420 That was a big sigh, because it's a real big sigh. 3681 05:15:58,280 --> 05:16:05,720 We're working with our board staff and others who have a lot of opinions about how the advisory committee should move forward, too. 3682 05:16:06,220 --> 05:16:06,920 Just a minute. 3683 05:16:07,240 --> 05:16:17,020 As sure that number one, it goes forward because it will be helpful and it was very helpful with both the original plan and the second. 3684 05:16:17,980 --> 05:16:20,940 But to do it in a way that has a bit more focus. 3685 05:16:22,980 --> 05:16:25,940 So we're going to need to take a little bit of time on that. 3686 05:16:25,940 --> 05:16:35,500 The only other thing, I would say is, lastly, we need to gear up our LMA visits again. 3687 05:16:36,220 --> 05:16:41,160 Accordinate those with Andrew and Preston or whoever. 3688 05:16:42,260 --> 05:16:44,380 I guess we've been doing those mostly with Ruth. 3689 05:16:44,880 --> 05:16:47,440 Ruth and yeah, we'll continue with that. 3690 05:16:47,520 --> 05:16:53,040 I just want to mention, I also am on top already of the designated floodway request that you had made. 3691 05:16:53,040 --> 05:16:58,740 That was one of the priorities I turned into the Secretary's office last year, so we're working 3692 05:16:58,740 --> 05:17:06,420 on making sure that in all of the requisite needs for all of the agencies so that we'll 3693 05:17:06,420 --> 05:17:12,340 be eligible for funding for that program to improve and expand it. 3694 05:17:12,720 --> 05:17:14,100 So we're on top of that. 3695 05:17:14,820 --> 05:17:20,240 Okay, anything on upcoming meetings and topics other than what's on the agenda? 3696 05:17:20,240 --> 05:17:24,980 We have a topic in February, which we'll talk about. 3697 05:17:25,220 --> 05:17:25,880 We do. 3698 05:17:26,100 --> 05:17:30,880 It's going to be a scoping for the plan for the San Joaquin specifically and some of the 3699 05:17:30,880 --> 05:17:31,440 climate change. 3700 05:17:32,280 --> 05:17:38,180 I think Mary is in the audience now waiting to do a little pre-brief on that, so we'll have 3701 05:17:38,180 --> 05:17:42,260 some more info after that, but it should be a good workshop. 3702 05:17:42,940 --> 05:17:43,100 Okay. 3703 05:17:43,660 --> 05:17:44,080 Great. 3704 05:17:45,020 --> 05:17:51,660 We have no closed session and therefore no closed session report, and so at the 3705 05:17:55,020 --> 05:17:59,140 we'll, without objection, say it this meeting's adjourned. Thank you.