1 00:00:04,270 --> 00:00:21,990 We appreciate it very much. These facilities do have a Wi-Fi available for those who have electronic devices in the room would appreciate it if you would put your cell phones, laptops and tablets into solid mode in difference to the proceedings. 2 00:00:22,930 --> 00:00:32,430 For those of you who wish to speak to the board, please fill out the speaker slips, which can be found in the lobby prior to entering the council chambers. 3 00:00:32,430 --> 00:00:46,070 And if you find that, please fill it out, mark the number of the agenda item that you want to address so that when we get to that, we can call upon you to come to the podium. 4 00:00:47,070 --> 00:00:57,750 If you're anticipating speaking to the board, I would suggest that you read the notes on the printed agenda for the meeting so that you may be properly prepared. 5 00:00:59,210 --> 00:01:05,990 Members, we have one time item today at one o'clock, which is a public hearing for the 6 00:01:05,990 --> 00:01:11,730 Myers enforcement order, which the board, I think, is familiar with by this time. 7 00:01:12,090 --> 00:01:18,790 I would propose trying to complete all the items on the agenda with the closed session 8 00:01:18,790 --> 00:01:20,470 at the end of the morning. 9 00:01:21,250 --> 00:01:28,010 Then we would conduct the closed session during the lunch period, and then finally we would 10 00:01:28,010 --> 00:01:35,090 conduct the timed enforcement hearing as the last item for the day at one or one 11 00:01:35,090 --> 00:01:39,090 thirty close to one o'clock that we can get back from our closed session. 12 00:01:40,190 --> 00:01:47,930 If that is acceptable to the board, I think we'll establish that as a goal for today. 13 00:01:49,210 --> 00:01:54,910 I do believe we have a very interesting agenda this morning so let's proceed it's always an 14 00:01:54,910 --> 00:02:01,130 interesting day when you have an enforcement hearing regarding the items themselves vice 15 00:02:01,130 --> 00:02:08,070 president and secretary Jane Dolan under item three will be presenting the minutes of December 16 00:02:08,830 --> 00:02:15,410 20th regular board meeting I believe those items all four items are in order and are ready 17 00:02:15,410 --> 00:02:23,890 adoption, they will be adopted with one single vote unless someone wants to, from the public 18 00:02:23,890 --> 00:02:28,470 or on the board, remove it from consent calendar for discussion. 19 00:02:31,330 --> 00:02:32,950 The consent calendar, I 20 00:02:32,950 --> 00:02:39,390 say, has four items in and we'll proceed with one vote. Next under item seven, 21 00:02:43,170 --> 00:02:43,810 Ryan Larson, 22 00:02:43,810 --> 00:02:49,430 the chief of the flood protection and navigation section of the core will be discussing the new 23 00:02:49,430 --> 00:02:56,750 levee safety draft guidance that was just released for public review this week and kicks off 24 00:02:56,750 --> 00:03:03,090 a 60-day public review period hopefully Ryan will be able to give us some insight about this new 25 00:03:03,090 --> 00:03:11,650 guidance and how it compares to or doesn't compare to our OMRR resolution that the board adopted a 26 00:03:11,650 --> 00:03:18,090 months ago. That'll be an interesting presentation. Then under Item 8, Jeremy Erich, Chief 27 00:03:18,090 --> 00:03:22,790 of the Division of Flood Management, has his monthly report for the Department of Water 28 00:03:22,790 --> 00:03:30,590 Reef Forces. He will make the first presentation under Item 8A. Then under Item 8B, Mary 29 00:03:30,590 --> 00:03:38,850 Hemman is from DWR, will provide an update on the Board's workshop regarding climate, change 30 00:03:38,850 --> 00:03:46,810 the challenges and solutions analyzed in the 2017 update of the flood plan and what we're looking 31 00:03:46,810 --> 00:03:54,570 forward to and their approach to that subject, how they're one or approach it for the 2022 32 00:03:54,570 --> 00:04:01,610 flood plan update. And that's been a subject that the board has been invested in for some time. 33 00:04:01,610 --> 00:04:26,590 Also under item 8C, Darren Sue and of the Board staff and others from DWR will be giving us an update on the public scoping process for the Delta convenience project as well as the rundown on the initial study and the negative proposed mitigated negative declaration for soils and investigations for the data collection in the Delta. 34 00:04:26,590 --> 00:04:33,210 And finally, under I'm a D. Dave Wilden from DWR, we'll give us an update on the state 35 00:04:33,210 --> 00:04:40,450 federal rehabilitation work from the 2017 and 2019 storm events. 36 00:04:40,630 --> 00:04:46,910 This item was postponed from last month, and Dave will be presenting that this morning. 37 00:04:48,070 --> 00:04:55,330 Then after item eight, I'd like to proceed to item 11 board items, and we have three 38 00:04:55,330 --> 00:04:59,990 for consideration, one is 11A is the timed item which will be discussed. 39 00:05:02,580 --> 00:05:15,860 We're going to talk about this as in the past board meetings on, we've had briefings on that, but we're asking 40 00:05:15,860 --> 00:05:25,400 being asked today to consider the approval of the permit to construct that seven mile levy setback project along the north bank of the Sacramento 41 00:05:25,400 --> 00:05:28,860 bypass in the east bank of the yellow bypass. 42 00:05:29,940 --> 00:05:34,820 Greg Harvey and Kyle Bickler from LIDWR will report for the board. 43 00:05:35,340 --> 00:05:39,700 Finally, under 11 C. Greg Harvey of our staff and Paul Brunner of three 44 00:05:39,700 --> 00:05:46,860 rumors, we'll be asking for our approval of permit number 1943 to construct approximately 45 00:05:46,860 --> 00:05:55,380 a 2.6 mile levy extension starting at the upstream terminus of the 46 00:05:55,380 --> 00:06:03,160 U.B. River, South Levy. This project was discussed by the board, informally at our meeting 47 00:06:03,160 --> 00:06:09,680 last month. Then under items 12, 13, and 14, we have our usual executive officers 48 00:06:09,680 --> 00:06:15,360 report, including the informational staff reports for the Board's review, and then we also have 49 00:06:15,360 --> 00:06:21,820 their normal board comments, committee updates, and calendar. Then after these items, I'd 50 00:06:21,820 --> 00:06:28,160 to go back to item nine, which is our closed session conducted during the lunch hour, and then 51 00:06:28,160 --> 00:06:33,980 as close to one o'clock after lunch, we'll proceed to the time hearing as the last item 52 00:06:34,480 --> 00:06:35,480 for the day. 53 00:06:36,500 --> 00:06:38,340 So this should be an interesting meeting. 54 00:06:39,940 --> 00:06:43,860 So under item one, let's leave you of any announcements you'd like to make. 55 00:06:44,200 --> 00:06:45,040 Thank you, Mr. President. 56 00:06:45,040 --> 00:06:45,820 Good morning, everyone. 57 00:06:46,040 --> 00:06:46,960 Just a couple of things. 58 00:06:46,960 --> 00:06:51,360 First of all, I wanted to note our new board member on the 59 00:06:51,360 --> 00:06:54,860 dias, Brian Johnson is joining us for our first regular board 60 00:06:54,860 --> 00:06:56,580 meeting. So welcome. 61 00:07:01,130 --> 00:07:02,630 Also just to note and give 62 00:07:02,630 --> 00:07:06,090 regrets from Catherine Freeman, who normally joins us on behalf 63 00:07:06,090 --> 00:07:09,710 of Eduardo Garcia and the Assembly. She is on a speaking 64 00:07:09,710 --> 00:07:12,330 engagement in Southern California on behalf of 65 00:07:12,330 --> 00:07:15,310 Mr. Garcia and is unable to join us today. So she sends her 66 00:07:15,310 --> 00:07:23,670 threats for that. I would just also note both with happiness and with a little bit of unhappiness 67 00:07:23,670 --> 00:07:29,050 that we have promoted Wendy Valdez to a SSA, which is a staff service as Analyst. She's 68 00:07:29,050 --> 00:07:32,990 going to be working in the new safe construction. So we are going to be losing her excellent 69 00:07:32,990 --> 00:07:37,430 help here at the board meetings and I'm not sure what we're going to do without her, but we're 70 00:07:37,430 --> 00:07:43,310 very happy she's still with us. She's this is a great promotional opportunity for her, so congratulations 71 00:07:43,310 --> 00:07:44,330 to Wendy. 72 00:07:47,940 --> 00:07:52,520 And just he didn't want me to note this, but I would just note that it also was Gito's birthday 73 00:07:52,520 --> 00:07:57,300 yesterday, so happy birthday. Thank you for spending your day with us here. Those are all my 74 00:07:57,300 --> 00:07:57,680 announcements. 75 00:07:58,420 --> 00:08:04,040 Okay, thank you. Members, let's see, 76 00:08:06,420 --> 00:08:10,900 we're on the roll call. This is item two. Ryan, would you 77 00:08:10,900 --> 00:08:17,040 Please call the roll to turn we have a quorum and we can talk to others board member Johnson 78 00:08:18,320 --> 00:08:19,940 Board member Ramirez 79 00:08:20,460 --> 00:08:22,000 Board member Valines 80 00:08:22,000 --> 00:08:28,000 Board member country men for a member McDonald vice president. Oh, I'm 81 00:08:28,800 --> 00:08:33,340 President Edgar we're all here full board today, so we're obviously can 82 00:08:34,120 --> 00:08:40,040 Conduct our business members were on item three the minutes of our December 20th meeting 83 00:08:40,900 --> 00:08:45,120 regular business meeting for everyone's information. This is an action item. 84 00:08:45,240 --> 00:08:49,680 Mr. Dolan, our board vice president, Secretary has this item. 85 00:08:50,060 --> 00:08:52,000 Jane, please pause your question. 86 00:08:54,960 --> 00:08:56,220 Thank you. 87 00:08:57,240 --> 00:09:04,760 I got my schedule all sorted out so now it went out with the agenda packet instead of two days after that. 88 00:09:05,240 --> 00:09:08,380 So for our new board member, I've been to remind the rest of you. 89 00:09:08,940 --> 00:09:11,500 I've reviewed these and I believe they are in order, 90 00:09:11,500 --> 00:09:16,200 But I pause to see if anyone has a question or a correction or comment. 91 00:09:19,030 --> 00:09:23,950 I see none. So I move a approval of the minutes of December 20th, 2019. 92 00:09:24,950 --> 00:09:25,930 Do I have the second to this question? 93 00:09:26,730 --> 00:09:33,950 Okay, moved by Dolan seconded by McDonald's, the minutes of our December 20th meeting, be approved. 94 00:09:34,450 --> 00:09:36,910 Any members of the public want to comment on the minutes? 95 00:09:37,810 --> 00:09:39,950 Thank you. Bring it back to the board. All in favor? 96 00:09:41,570 --> 00:09:44,510 minutes for December 20th. 97 00:09:47,330 --> 00:09:53,430 Oh, thank you. When they're right, be hard to approve the minutes. 98 00:09:54,530 --> 00:09:59,930 Okay, minutes were approved with Mr. Johnson abstaining because he had 99 00:10:00,940 --> 00:10:01,420 Okay, 100 00:10:03,500 --> 00:10:11,440 there may be you were appointed, but you didn't, yeah, I think that's right, yeah, whatever. Okay, we're on item 4, 101 00:10:12,060 --> 00:10:16,720 Leslie, you want to review the agenda and clear up any items that I may have missed? 102 00:10:16,920 --> 00:10:24,140 Yes, thank you, Mr. President. I just have one item of note on item 5D, or consent item, your staff report, 103 00:10:24,140 --> 00:10:28,140 acknowledge that there was no core letter received, but we do have the core letter and 104 00:10:29,200 --> 00:10:34,380 Gary Lemon has copies of that for anybody who would like to see it. There were it's your 105 00:10:34,380 --> 00:10:41,740 typical core letter with no additional conditions. Okay thank you. Okay members we are on item five 106 00:10:41,740 --> 00:10:49,480 are consent calendar for today, today's meeting and as I said earlier, unless someone on the board 107 00:10:49,480 --> 00:10:57,080 or in the public wants to remove one of these items, we will approve items 5A through 5D with 108 00:10:57,080 --> 00:11:05,280 a single motion and a second followed by a single vote. And obviously this will be an action item. 109 00:11:07,280 --> 00:11:13,740 Are there, I won't read the items, you have the agenda items, we're talking about 5A through 110 00:11:14,460 --> 00:11:20,260 5D, is there any, what's the pleasure of the board? 111 00:11:23,060 --> 00:11:25,980 Okay, move by, countrymen second by, 112 00:11:28,360 --> 00:11:33,560 is there any member of the public, want to talk about 113 00:11:33,560 --> 00:11:39,460 any items on the consent calendar, this is items 5A through 5D. 114 00:11:39,580 --> 00:11:41,500 Okay, bring it back to the board, all in favor? 115 00:11:43,800 --> 00:11:48,340 Okay, unanimous vote for items 5, 8, 2, 5, b. 116 00:11:49,260 --> 00:11:55,400 Our on item 6, which is the item for public comments, not on the agenda. 117 00:11:55,980 --> 00:11:59,520 Is there anyone in the audience who wants to address the board? 118 00:12:00,560 --> 00:12:01,180 No, there's Melinda. 119 00:12:01,360 --> 00:12:01,820 Good morning. 120 00:12:02,160 --> 00:12:04,080 I'll leave it here because I'm going to talk another minute. 121 00:12:04,240 --> 00:12:04,840 Okay, great. 122 00:12:05,360 --> 00:12:06,240 We'll take care of that. 123 00:12:06,280 --> 00:12:07,540 Thank you, Melinda. 124 00:12:08,540 --> 00:12:09,920 Melinda Terry, who's the- 125 00:12:09,920 --> 00:12:14,340 Since we have a new board member, I'll formally introduce myself, my name is Melinda Terry. 126 00:12:14,780 --> 00:12:18,420 I'm the executive director of the California Central Valley Flood Control Association. 127 00:12:19,640 --> 00:12:24,100 And I'm going to try and attend mentally and bring something up at each meeting. 128 00:12:24,400 --> 00:12:30,120 So I just have one item today for you to consider for hopefully a future agenda item, 129 00:12:30,360 --> 00:12:35,080 and maybe an informal discussion before there's a permit before you. 130 00:12:35,080 --> 00:12:41,820 But as you know, there was the EIR for the notching of the Fremont weird. 131 00:12:41,960 --> 00:12:43,280 I have an operable gate. 132 00:12:43,540 --> 00:12:49,380 It has to do with the compliant with biological opinions, creating a salmon habitat for the 133 00:12:49,380 --> 00:12:56,140 Tracy pumps that are part of the state water project and the Central Valley project. 134 00:12:57,080 --> 00:13:00,920 And one of the things we'd like you to consider talking about in the future is one thing that 135 00:13:00,920 --> 00:13:09,160 very unclear in the EAR is whose facility is this going to be? Currently, the weir is officially 136 00:13:09,160 --> 00:13:15,380 part of the state plan of flood control. It's the facilities that the courts part of the 137 00:13:15,380 --> 00:13:21,680 bypass system that goes with the levees to help the efficient evacuation of flood waters. 138 00:13:23,160 --> 00:13:30,800 But once the notch is in, it does have an operable gate. I'm assuming DWR will operate that. 139 00:13:30,920 --> 00:13:34,820 I'm also assuming the operator does part of the state water project. 140 00:13:35,000 --> 00:13:38,060 But again, the EIR really was I'm clear about that. 141 00:13:38,520 --> 00:13:43,800 So it really would be nice since this really is the major workhorse for our system to understand 142 00:13:43,800 --> 00:13:49,320 a little bit more of who's who as that project moves forward. 143 00:13:49,680 --> 00:13:51,360 And I will leave it at that. 144 00:13:51,420 --> 00:13:52,360 Thank you. 145 00:13:54,820 --> 00:13:57,100 Yeah, I didn't know there was a question on that. 146 00:13:57,540 --> 00:14:00,900 Do you have been following that I have? 147 00:14:00,900 --> 00:14:10,060 Well, I hadn't thought through this idea, who's going to pay for the maintenance and operation of the gate I guess I guess Melinda's right then. Okay 148 00:14:10,060 --> 00:14:12,280 We'll do that. Thank you, Melinda 149 00:14:13,280 --> 00:14:20,540 Any other items or public any other items you received brand or Ryan you 150 00:14:20,540 --> 00:14:24,160 See if any other slips. Okay 151 00:14:25,060 --> 00:14:30,380 Okay, we're on item 7. This is the 152 00:14:30,900 --> 00:14:38,580 Court's release of the draft Levy guidance document for the public review and comment, and we heard 153 00:14:38,580 --> 00:14:43,980 an introduction of this item at the Courtney and Community on Wednesday, but Ryan indicated 154 00:14:43,980 --> 00:14:50,580 to the group there that he would be presenting at least what he knows about this new guidance 155 00:14:50,580 --> 00:14:58,580 at our board meeting today. He's kind of reading along and learning about it as we are because 156 00:14:58,580 --> 00:14:59,980 he wasn't real. 157 00:15:01,280 --> 00:15:06,760 Involved in the preparation of the document itself. So I'll just let Ryan speak. Good morning, sir. 158 00:15:07,400 --> 00:15:10,880 Good morning, President Anchor. And members of the Board, my name is Ryan Larson, the Army Corps of Engineers, 159 00:15:11,080 --> 00:15:16,360 I'm the Chief of the Levies in Channel's Branch, in our operations division, and also one of the levies he took program managers. 160 00:15:17,040 --> 00:15:26,180 So I'm coming to you with information about a draft, levies safety, engineer circular, which is a document that's been published by the agency, 161 00:15:26,180 --> 00:15:39,000 We're not in the federal register earlier this week, and we want to make sure that our sponsors are aware of this document and get adequate chance to take a look at it and review it and provide comments. 162 00:15:40,660 --> 00:15:49,000 So with that, I'll jump into the intent of the levee safety program. Just read this here and make sure that everyone's clear what we're doing. 163 00:15:49,000 --> 00:15:54,860 We understand monitor and manage flood risk associated with levees over time and to adapt 164 00:15:54,860 --> 00:15:58,540 activities and actions based on the dynamic nature of flood risk. 165 00:15:59,880 --> 00:16:03,720 And so that's a state of intensive of the levees safety program and then this document 166 00:16:03,720 --> 00:16:08,500 gets into how we're going to do that or the approaches for that. 167 00:16:08,820 --> 00:16:15,320 This document lays out risk-informed decision-making as one of those approaches. 168 00:16:15,900 --> 00:16:23,120 So, we're looking at the water, the hazard, the performance of the levy systems, and then also 169 00:16:23,120 --> 00:16:25,520 the consequences, land, or of those levy. 170 00:16:27,100 --> 00:16:35,340 And all those things, a couple together, a great risk, and then so we're looking at all 171 00:16:35,340 --> 00:16:37,520 those factors in risk informed decision making. 172 00:16:37,860 --> 00:16:41,940 We want to make sure that we've got transparent engagement with the public and with our 173 00:16:42,720 --> 00:16:46,100 We understand the key role that sponsors play and operating maintaining those 174 00:16:46,100 --> 00:16:46,860 levees. 175 00:16:47,900 --> 00:16:52,260 And then there's also showing a connection between the core of engineers and 176 00:16:52,260 --> 00:16:54,780 FEMA on information related to levees. 177 00:16:56,620 --> 00:17:01,440 So I'm going to break down the document itself when you sit down and 178 00:17:01,440 --> 00:17:02,600 crack this open for the first time. 179 00:17:02,620 --> 00:17:04,940 You understand a little bit of what you're looking at. 180 00:17:06,360 --> 00:17:10,520 Okay, so this is one document and we're really talking to two 181 00:17:10,520 --> 00:17:12,940 of an audience with this circular. 182 00:17:14,240 --> 00:17:18,580 One being sponsors, local maintaining agencies, 183 00:17:19,080 --> 00:17:20,460 people doing the workout in the field. 184 00:17:21,040 --> 00:17:23,860 And then it's also a policy document 185 00:17:23,860 --> 00:17:26,640 to speak to core engineers employees 186 00:17:26,640 --> 00:17:28,380 and how we do our business. 187 00:17:29,920 --> 00:17:32,540 And it's broken down into four volumes. 188 00:17:33,580 --> 00:17:37,240 So when you think of volumes, I think of an encyclopedia 189 00:17:37,240 --> 00:17:45,900 on the shelf that's 30 volumes long, but this document's only 125 pages in total, so it's 190 00:17:45,900 --> 00:17:50,600 not going to break you back or keep you up late hours reading all of this. 191 00:17:51,080 --> 00:17:57,140 On the 25 pages with those four different volumes, the upfront matter is definitions key 192 00:17:57,140 --> 00:18:08,880 terms, volume two is speaking to sponsors, sponsors roles and responsibilities in the 193 00:18:08,880 --> 00:18:16,180 The core policy, speaking to core employees, and then the fourth one is speaking to everybody about who else uses this information. 194 00:18:16,360 --> 00:18:19,620 So I'm going to break down each one of these different volumes a little bit closer. 195 00:18:20,660 --> 00:18:26,700 First one being those purposes of levy safety purposes of this document and some of those key terms and definitions. 196 00:18:29,900 --> 00:18:31,860 Second one, speaking to sponsors. 197 00:18:33,140 --> 00:18:39,820 So if you want to focus your efforts on what this document is trying to do and speaking to sponsors, look at volume two. 198 00:18:41,320 --> 00:18:44,780 But these are what we think the sponsors responsibilities are in the 199 00:18:44,780 --> 00:18:45,500 levy safety program. 200 00:18:45,780 --> 00:18:53,660 It's organized around the concept of prepare, respond, recover and mitigate. 201 00:18:54,700 --> 00:19:01,580 Typically use those terms in a disaster response or the disaster response model. 202 00:19:03,440 --> 00:19:04,720 But you respond to a disaster. 203 00:19:04,960 --> 00:19:05,920 You cover from the disaster. 204 00:19:06,640 --> 00:19:09,540 And afterwards you look at it and say, what sort of things can we do to mitigate? 205 00:19:11,200 --> 00:19:17,080 for the next, next thing Mother Nature throws in us, but that's how this chapter of 206 00:19:17,080 --> 00:19:18,420 excuse me, volume is organized. 207 00:19:21,040 --> 00:19:23,300 Okay, very busy slide. This is the one that speaks to 208 00:19:23,300 --> 00:19:29,740 the core of engineers staff, but I'm, I'm, I'm, I'm, I'm all this to say, there's, 209 00:19:29,740 --> 00:19:34,240 there's different chapters within this volume. The ones highlighted in dark blue or 210 00:19:34,240 --> 00:19:41,020 the ones I'm going to talk to on the next slide, that I think have, have, the boards 211 00:19:41,020 --> 00:19:43,020 interest, or should have the board's interest. 212 00:19:44,100 --> 00:19:45,820 So those areas are program oversight, 213 00:19:46,620 --> 00:19:49,300 levee inspections and site visits, risk assessments, 214 00:19:50,000 --> 00:19:51,100 and then tracking levee risk. 215 00:19:54,960 --> 00:19:58,080 So in that first category of program management. 216 00:20:00,940 --> 00:20:07,060 The policy requires the district to come up with a 10-year outlook, a program management plan of the 10-year outlook. 217 00:20:07,760 --> 00:20:11,600 So what levees are we going to be looking at within the next 10 years? What's our schedule? 218 00:20:12,440 --> 00:20:16,520 So that, so that you as the sponsor could know at any given time, you know, which ones are next? 219 00:20:16,820 --> 00:20:19,020 Which ones are coming next year and the year after that? 220 00:20:22,040 --> 00:20:28,200 Next, the type of any inspections area, you know, one thing, one thing of difference here is that, 221 00:20:28,200 --> 00:20:31,920 There's no longer routine and periodic inspections. 222 00:20:32,220 --> 00:20:41,950 There's just inspections, formal inspections with a requirement to do those inspections once 223 00:20:41,950 --> 00:20:43,330 every five years. 224 00:20:46,020 --> 00:20:51,020 In the previous policy is in documents, there were routine inspections that the court district 225 00:20:51,020 --> 00:20:58,640 was to do every year, that in this district is challenging with our resources and our amount 226 00:20:58,640 --> 00:21:03,800 funding that we get, and we lean heavily upon, upon Department of Water Resources and the 227 00:21:03,800 --> 00:21:05,800 work that they do, I mean, there's in their inspections. 228 00:21:07,040 --> 00:21:13,640 But in this document, there's, there are formal inspections conducted once every five years 229 00:21:13,640 --> 00:21:14,640 and then special inspections. 230 00:21:14,860 --> 00:21:19,420 And those are, as needed, if something happens, and you call us, and you say, hey, there's 231 00:21:19,420 --> 00:21:22,780 a problem out there, we can go out and take a look at that, and that would be called a special 232 00:21:22,780 --> 00:21:27,900 inspection, and we would document what we saw, or if there was, you know, some sort of flood 233 00:21:27,900 --> 00:21:33,760 or another event that cost a change, we could go out and take a look at that and we would be calling that a special inspection. 234 00:21:35,320 --> 00:21:41,420 Another item of interest is that there would be no system and segment ratings associated with a levy inspection. 235 00:21:42,520 --> 00:21:53,100 So we would not come out and say levy system x is unacceptable or levy system y is unacceptable or minimally acceptable or acceptable. 236 00:21:56,880 --> 00:22:02,520 We're still going to be doing inspections, and rating those individual categories of maybe 237 00:22:02,520 --> 00:22:08,340 encroachments or erosion or sea victims stability, and we'll be rating those individual 238 00:22:08,340 --> 00:22:14,360 items, but we won't have an overall rating for the levy system. 239 00:22:15,440 --> 00:22:23,690 And so that ties a little bit to the last bullet there, the last item, so I'm going to 240 00:22:23,690 --> 00:22:26,550 see if I can address the questions before you ask them. 241 00:22:29,630 --> 00:22:33,630 And then, so back to inspections here for staying with inspections for a second, there's a 242 00:22:33,630 --> 00:22:36,550 10 day requirement for a 10 day notification of an upcoming inspection. 243 00:22:37,150 --> 00:22:44,710 I would say we do that already with board staff, notifying you at least 10 to 10 business 244 00:22:44,710 --> 00:22:46,070 days before an upcoming inspection. 245 00:22:47,410 --> 00:22:51,710 Assessments, risk assessments will be conducted once every 10 years, and there's a requirement 246 00:22:51,710 --> 00:22:55,410 to notify sponsors at least 30 days in advance 247 00:22:55,410 --> 00:22:56,510 of an upcoming risk assessment. 248 00:22:58,350 --> 00:23:00,670 And then, this last item on the screen here, 249 00:23:00,670 --> 00:23:04,030 this ties to the chapter of tracking levy risk 250 00:23:05,230 --> 00:23:08,470 is this concept of a levy risk management summary. 251 00:23:10,210 --> 00:23:12,810 So as we do levy inspections, we learn more 252 00:23:12,810 --> 00:23:13,630 about the levy system. 253 00:23:14,090 --> 00:23:18,470 As we do a risk assessment, we learn even more about the levy system. 254 00:23:18,470 --> 00:23:21,690 And we learned what are the, what are the, 255 00:23:21,690 --> 00:23:23,990 what are called the risk drivers for a levee system? 256 00:23:24,770 --> 00:23:26,410 Is it, you know, what are the, 257 00:23:26,790 --> 00:23:29,190 what are the things driving the risk for a particular levee system? 258 00:23:30,710 --> 00:23:33,490 And so ideally, the next time we've got to do a levee inspection, 259 00:23:33,870 --> 00:23:35,690 we're focused on the risk drivers 260 00:23:37,070 --> 00:23:40,030 when we've got inspect and say, you know, 261 00:23:40,510 --> 00:23:44,490 hey, the risk drivers for this levee system are 262 00:23:44,490 --> 00:23:45,250 sea-bitch and piping. 263 00:23:46,210 --> 00:23:51,550 And as we go out and do our next inspection, we're going to be looking at, primarily, 264 00:23:52,810 --> 00:23:58,350 seepage in piping and sponsor, what have you done in your maintenance actions to improve 265 00:23:58,350 --> 00:24:00,830 the conditions of seepage in piping through this lovey system? 266 00:24:01,930 --> 00:24:08,510 And so this lovey risk management summary is trying to document the issue, 267 00:24:11,180 --> 00:24:11,800 and then promote 268 00:24:11,800 --> 00:24:16,400 a dialogue between us, the core of engineers and the sponsors and the look of maintaining 269 00:24:16,400 --> 00:24:20,540 agencies to say, you know, what are these drivers for this 270 00:24:20,540 --> 00:24:23,680 level of the system? What are the actions that you're taking to improve the conditions of those drivers? 271 00:24:24,340 --> 00:24:30,920 And then we capture that in that level of risk management summary. So what I think this policy is trying to get at is that 272 00:24:30,920 --> 00:24:34,060 rather than saying the level of the system is unacceptable or minimally acceptable, 273 00:24:35,160 --> 00:24:39,400 the sponsor is aware of the risk drivers and they are taking actions to reduce risk 274 00:24:39,960 --> 00:24:43,460 associated with those risk drivers in this level of the system that will pause there. 275 00:24:44,930 --> 00:24:51,990 I've partially reviewed this document, so I don't want to claim I know all about it. 276 00:24:52,350 --> 00:24:59,930 There's a big emphasis on the definition of risk, which is consequences and probability of... 277 00:25:00,000 --> 00:25:08,740 Failure, probability of a problem. I didn't hear that in what you just said. In other words, if we got a rural area, 278 00:25:09,600 --> 00:25:15,580 you may have a very low risk. But you seem to be emphasizing what have you done about 279 00:25:15,580 --> 00:25:22,980 sea beach, or what have you done about a whatever. How are you reconciling those two ideas here? 280 00:25:22,980 --> 00:25:32,000 Every levy system has risk, every levy system is going to have risk drivers for that area, 281 00:25:32,160 --> 00:25:34,080 for that levy system, what is driving the risk. 282 00:25:35,260 --> 00:25:41,120 And so what is being done, and then what is, so then the conversation turns to what is being done about that risk for that levy system. 283 00:25:42,120 --> 00:25:49,160 For that rural area, for that rural area, they should still be concerned about the risk drivers, 284 00:25:49,160 --> 00:25:53,520 whether they're high risk or low risk they should still be a rural area should still be 285 00:25:53,520 --> 00:25:56,160 concerned about the risk drivers and should still be thinking about the risk 286 00:25:56,160 --> 00:25:59,680 drivers and taking actions to reduce the risks associated with their love 287 00:25:59,680 --> 00:25:59,980 system. 288 00:26:00,240 --> 00:26:06,760 But you're not ranking in other words, in any kind of ranking, you're going to find it was 289 00:26:06,760 --> 00:26:10,100 based on risk and the need to take actions. 290 00:26:10,840 --> 00:26:15,600 Say, you're going to find the rural areas have a very low risk because the 291 00:26:15,600 --> 00:26:19,120 consequences are so low compared to an urban area, for instance. 292 00:26:19,640 --> 00:26:25,540 So there's not an idea here of ranking risk and saying we got to take the most risky 293 00:26:25,540 --> 00:26:27,940 actions first or water. 294 00:26:29,560 --> 00:26:35,440 Not big large-scale programmatically, you know, for, for, for, for levy sponsors and local 295 00:26:35,440 --> 00:26:36,140 maintaining agencies. 296 00:26:36,240 --> 00:26:39,760 We want local maintaining agencies to look at their, at their levy system in their 297 00:26:39,760 --> 00:26:44,620 world and, and take actions to reduce the risks in their, in their, in their system, 298 00:26:44,620 --> 00:26:47,520 So I'm not comparing system Y. 299 00:26:48,800 --> 00:26:51,900 There are, I would say, the risk assessments 300 00:26:51,900 --> 00:26:55,960 allow the core of engineers to look nationwide 301 00:26:56,980 --> 00:27:01,340 and spread their money where there are the greatest risks 302 00:27:02,720 --> 00:27:04,080 and so the conversation. 303 00:27:04,300 --> 00:27:06,420 I'm doing on, I'm sorry. 304 00:27:07,060 --> 00:27:09,680 You're now you've lost me a little bit here. 305 00:27:09,860 --> 00:27:13,220 Okay, the core, this is about operation and maintenance, isn't it? 306 00:27:13,220 --> 00:27:16,440 This is about the levy safety program, the whole program. 307 00:27:16,440 --> 00:27:18,000 This is about the levy safety program. 308 00:27:19,620 --> 00:27:21,860 So that levy safety, the operations, 309 00:27:22,060 --> 00:27:25,660 maintenance is a piece of that, of that, 310 00:27:26,640 --> 00:27:29,360 looking at risks associated with performance of a levy system. 311 00:27:29,500 --> 00:27:32,340 Those are operations, maintenance is a piece of that risk. 312 00:27:32,900 --> 00:27:35,620 But the right effect of recovery, you're saying, 313 00:27:36,120 --> 00:27:41,580 that if there's damage in it, I say, well, because there's low risk here, 314 00:27:41,580 --> 00:27:45,200 that wouldn't get the allocation, the allocation would go to the high risk. 315 00:27:45,400 --> 00:27:47,520 That could happen. That could happen. 316 00:27:48,680 --> 00:27:53,720 If I went back, I'm just going to go back a couple of slides here to show you. 317 00:28:01,470 --> 00:28:03,930 Sorry, it's not, I thought it was on here, it's not on here. 318 00:28:05,250 --> 00:28:09,330 But risk could be a tool for the Corps of Engineers to prioritize limited resources 319 00:28:10,650 --> 00:28:14,230 and spend the money where the risks are the greatest. 320 00:28:15,530 --> 00:28:21,130 That is possible, and this document does lay that out or set that up. 321 00:28:22,190 --> 00:28:24,250 That's a big one for us. 322 00:28:28,060 --> 00:28:33,540 So just stopping here on a love U.S. management summaries are that's something new. 323 00:28:34,640 --> 00:28:41,200 But it's something, hopefully, to guide core of engineers and inspectors on what to look for. 324 00:28:41,200 --> 00:28:48,160 during the next levy inspection, but it also would guide sponsor actions on the ground with 325 00:28:48,160 --> 00:28:51,960 associated with their levy system. What are the things that they can do to reduce the risks 326 00:28:51,960 --> 00:28:53,920 associated with their particular levy system? 327 00:28:54,680 --> 00:29:04,000 Okay. Ryan, we spent a lot of time on the resolution, kind of trying to get an understanding 328 00:29:04,000 --> 00:29:10,300 of what the criteria is for OMRRR. Is there anything in this guidance that is 329 00:29:11,200 --> 00:29:15,120 would affect the criteria or definitions that we worked on for. 330 00:29:15,620 --> 00:29:20,560 I do not believe so, and I'll cite my basis for my comment. 331 00:29:21,460 --> 00:29:25,120 It's on its volume two, levy sponsor activities. 332 00:29:25,700 --> 00:29:28,880 At the bottom of page one, there's a sentence that says, 333 00:29:29,120 --> 00:29:33,020 nothing in this document modifies or takes the place of the responsibilities 334 00:29:33,020 --> 00:29:36,340 of levy sponsors identified in 33 CFR, 335 00:29:36,340 --> 00:29:40,200 to wait 10 or project partnership agreements. 336 00:29:41,780 --> 00:29:48,340 Okay. Okay. 33 code of federal regulations to wait 10 is the document that is the basis for our operations and maintenance manuals. 337 00:29:49,260 --> 00:29:51,440 Right. And then there's also project partnership agreements. 338 00:29:52,100 --> 00:29:59,780 But there's calling out, you know, that statement basically saying nothing in this, in this levy safety policy document changes. 339 00:30:00,300 --> 00:30:04,320 Anything in our operations, maintenance manuals, or a project-pernish micromancer. 340 00:30:05,020 --> 00:30:12,940 For what you're saying, it sounds to me like we're talking more of a change in process and review and oversight, 341 00:30:13,160 --> 00:30:20,140 rather than basic definitions and criteria used out in the field. 342 00:30:21,360 --> 00:30:25,780 I feel like we're taking things to the next step. 343 00:30:25,780 --> 00:30:32,000 We might have been just focused on, you know, with our blinders on looking at the levy and doing it levy inspections, right? 344 00:30:32,580 --> 00:30:37,990 But here we're now we're broadening our view and looking more more at everything that's going on out there. 345 00:30:39,360 --> 00:30:41,780 And, and then, 346 00:30:42,520 --> 00:30:48,010 you know, acknowledging that there are actions that that sponsors and maintaining agencies can take to. 347 00:30:50,000 --> 00:30:54,260 There are, there are actions that they can take and get more bang for their buck. 348 00:30:55,580 --> 00:31:00,820 You know, if you looked at the inspection checklist, you could say, well, gosh, there's 15 items on here. 349 00:31:00,960 --> 00:31:03,160 I got to go do all 15 of these things. 350 00:31:04,920 --> 00:31:07,480 So, a better start at number one and just work my way down the list. 351 00:31:09,040 --> 00:31:15,000 We're trying to get to, you know, okay, what are the best things to go look at today? 352 00:31:15,180 --> 00:31:16,900 And work on with my levy system today. 353 00:31:17,000 --> 00:31:19,760 What's going to give me the most bank for my buck? What's going to drive my risk down? 354 00:31:21,320 --> 00:31:23,200 And, you know, I've got limited resources. 355 00:31:23,660 --> 00:31:28,540 What are the best, what are the best four things I could go do today, and what's my justification 356 00:31:28,540 --> 00:31:39,820 for going and doing those, those, those things yeah yeah yeah I think Tim was on the cube 357 00:31:39,820 --> 00:31:45,660 where I get to, that's okay I was waiting patiently I was waiting until you finished but now 358 00:31:45,660 --> 00:31:50,640 I can't myself sorry you guys do we're gonna ask questions right I'm probably have several 359 00:31:50,640 --> 00:31:52,260 but I'm gonna try to ask an overarching one 360 00:31:52,260 --> 00:31:53,640 and you can fill in the blanks. 361 00:31:54,860 --> 00:31:57,380 How does this devtail with the inspections 362 00:31:57,380 --> 00:31:59,260 and the assessments and the ratings 363 00:31:59,260 --> 00:32:00,800 for the PLA-49 program? 364 00:32:02,950 --> 00:32:05,670 The inspections that we do are the basis 365 00:32:05,670 --> 00:32:08,590 for making our PLA-499 determinations. 366 00:32:10,630 --> 00:32:12,050 But now we're doing them less frequently. 367 00:32:15,870 --> 00:32:19,450 We would be, this policy would get us closer 368 00:32:19,450 --> 00:32:22,810 to what we currently do here in this district. 369 00:32:22,810 --> 00:32:30,170 Okay. On almost once in 10 years cycle. 370 00:32:32,230 --> 00:32:39,490 And that just works out with the amount of funding and resources that our district gets to inspect the levies that we have. 371 00:32:40,510 --> 00:32:46,770 So fundamentally, I think we said is nothing really changes. All that stays. It's the same. 372 00:32:46,770 --> 00:32:54,150 would try to just figure out how would be codified, I guess, and what you guys have in writing 373 00:32:54,150 --> 00:32:55,130 as guidance that's provided. 374 00:32:55,310 --> 00:32:59,430 That program is intact and it carries forward. 375 00:33:00,570 --> 00:33:06,950 The Dismarination Strupulity 49 will continue to be made, and there's the right now. 376 00:33:07,070 --> 00:33:13,130 There's an interim guidance on making PULI-499 decisions and determinations, and that policy 377 00:33:13,130 --> 00:33:20,390 still stands, and we would, this would just be the policy that we would use for how frequently 378 00:33:20,390 --> 00:33:24,690 we would go out and do inspections, the determinations that are made with those inspections 379 00:33:24,690 --> 00:33:27,630 would be back to that interim guidance for the billy for any of that. 380 00:33:27,770 --> 00:33:31,330 And those inspections are done the same way, where there are same inspections. 381 00:33:32,370 --> 00:33:33,290 Same as what you just mentioned. 382 00:33:33,430 --> 00:33:37,210 Because I thought you said that there was something else about them, you weren't going 383 00:33:37,210 --> 00:33:39,210 to be checking the boxes like you had before. 384 00:33:39,210 --> 00:33:41,130 We weren't going to be a sign. 385 00:33:41,390 --> 00:33:42,470 We're still going to do the inspection. 386 00:33:42,810 --> 00:33:46,350 We're still going to look at the same things, right? 387 00:33:47,910 --> 00:33:50,330 We just will not come to the end and say, 388 00:33:50,990 --> 00:33:52,790 this levy system is unacceptable. 389 00:33:55,890 --> 00:33:58,810 We will come to the end of the inspection, and we will say, 390 00:33:59,370 --> 00:34:01,630 look at looking at the levy risk management summary. 391 00:34:02,010 --> 00:34:05,390 We'll say, this levy system has deficiencies in the areas 392 00:34:05,390 --> 00:34:10,810 of erosion, encroachments, and running. 393 00:34:13,550 --> 00:34:17,530 And the levees sponsor needs to work on those items, needs to work on those deficiencies. 394 00:34:18,350 --> 00:34:21,630 I can see here from the levee risk management summary in the conversation with the sponsor. 395 00:34:22,050 --> 00:34:25,290 They've been working on encroachment issues and erosion. 396 00:34:25,510 --> 00:34:28,150 They really haven't had time and resources to work on the running. 397 00:34:29,430 --> 00:34:32,510 But the risk drivers indicate that they're on the right track. 398 00:34:32,510 --> 00:34:36,590 They were working on, they were working on the right things. 399 00:34:38,470 --> 00:34:40,710 Okay, so let me test that for a second. 400 00:34:40,810 --> 00:34:47,530 If there's a system that last year was inspected and determined to be up to SNAP, 401 00:34:47,670 --> 00:34:48,490 I think it was fine. 402 00:34:49,330 --> 00:34:49,650 I'm sorry. 403 00:34:49,930 --> 00:34:52,310 If a system was inspected two years ago, 404 00:34:53,310 --> 00:34:53,950 I think it was fine. 405 00:34:54,830 --> 00:34:58,790 And now you out inspect again in with this new guidance. 406 00:34:58,790 --> 00:34:59,990 Um, it sounds... 407 00:35:00,000 --> 00:35:10,830 It's like there's not going to be a determination made that it's insufficient ever again, potentially. 408 00:35:11,510 --> 00:35:16,490 You're just giving us advice, but you're not going to take it instead of the category of your deficient. 409 00:35:16,830 --> 00:35:21,390 We're still going to make inspections. We're still going to do inspections, right? We're still going to inspect those individual items. 410 00:35:21,910 --> 00:35:26,830 So the item that I think this levee system, the problem that this levee system had was erosion. 411 00:35:28,490 --> 00:35:31,510 And in the last two years there are a erosion problem has developed. 412 00:35:32,670 --> 00:35:35,290 We would document that there is an erosion problem with this levee system. 413 00:35:37,860 --> 00:35:39,360 That will conclude the levee inspection. 414 00:35:40,420 --> 00:35:44,900 We would look at our guidance for determining peolety-formin and analogieability for levee systems. 415 00:35:45,100 --> 00:35:49,860 We would look and is erosion an item that has a bearing on peolety-formin and analogieability. 416 00:35:50,740 --> 00:35:51,440 Yes or no? 417 00:35:51,440 --> 00:35:57,340 in this case yes yes it does right and so we will say okay sponsor here are the 418 00:35:57,340 --> 00:36:01,980 results of your levee system levee inspection there were issues in the category 419 00:36:01,980 --> 00:36:02,780 of erosion. 420 00:36:05,780 --> 00:36:08,980 Now you're able to get the determination guidance for for 421 00:36:08,980 --> 00:36:14,860 purely for name and when there when there is problems with erosion that levee 422 00:36:14,860 --> 00:36:21,100 system will be inactive in the rehabilitation problem. So we just won't get that like 423 00:36:21,100 --> 00:36:23,660 an overall statement that says this levee system is 424 00:36:23,660 --> 00:36:24,400 acceptable or minimum. 425 00:36:24,660 --> 00:36:30,180 We'll still be looking at the individual pieces of the inspection checklist and still 426 00:36:30,180 --> 00:36:32,420 be making PLD-499 determination. 427 00:36:35,920 --> 00:36:38,620 This sounds like it could be beneficial. 428 00:36:39,600 --> 00:36:41,780 Let me just test it here for a second. 429 00:36:43,280 --> 00:36:44,380 Let's take your example. 430 00:36:44,580 --> 00:36:51,460 You found that there's a erosion problem and we have an event and there's a failure due to 431 00:36:51,460 --> 00:36:58,000 Undersea Beach, some place where erosion has not been identified as a problem. 432 00:36:58,940 --> 00:37:07,680 Are you saying, okay, you could get PL-84.99 assistance with that location, because it 433 00:37:07,680 --> 00:37:10,840 wasn't found to be deficit. 434 00:37:11,320 --> 00:37:17,420 Even though the system has a hole, it may have been unacceptable under the old criteria. 435 00:37:17,420 --> 00:37:21,400 where that failure occurred, there was nothing identified, 436 00:37:21,920 --> 00:37:24,560 so therefore you could get PL-84.99. 437 00:37:27,120 --> 00:37:29,840 In this particular scenario that we're describing, 438 00:37:30,320 --> 00:37:32,280 if the levy system had erosion issues, 439 00:37:32,520 --> 00:37:35,520 and was determined to be inactive in the rehabilitation program 440 00:37:35,520 --> 00:37:37,040 because of those erosion issues, 441 00:37:37,620 --> 00:37:39,760 that seatbed site would not be eligible 442 00:37:39,760 --> 00:37:41,120 for PL-84.99 in rehabilitation. 443 00:37:41,940 --> 00:37:41,980 Why? 444 00:37:41,980 --> 00:37:43,620 This policy is not speaking. 445 00:37:43,820 --> 00:37:46,160 It's not changing the district determinations 446 00:37:46,160 --> 00:37:48,080 of PL-84.99 determinations at all. 447 00:37:48,080 --> 00:37:54,880 It's all it is saying is that at the end of an inspection, we will not come out with one single rating for a 448 00:37:54,880 --> 00:37:58,620 Lovey system or a Lovey segment of acceptable minimum acceptable or unacceptable 449 00:37:58,620 --> 00:38:08,760 We will still be making Pility 499 determinations like we are say that and because that doesn't seem to be consistent with with everything else that you're saying 450 00:38:08,760 --> 00:38:14,620 In other words, if the failure is due to something not related to the inspection findings 451 00:38:14,620 --> 00:38:23,100 why then it's not it's not acceptable to get PLA for 99 assistance. We can pull up I can 452 00:38:23,100 --> 00:38:29,920 propose to do a briefing at some other time about about how we make PLA for 99 determinations. 453 00:38:30,600 --> 00:38:35,840 That's not changed by- That's not changing by this policy. So what is this policy changing? 454 00:38:36,260 --> 00:38:41,840 That we are not going to give system or segment ratings for a levies system. So why? 455 00:38:46,360 --> 00:38:48,000 It doesn't change anything. 456 00:38:48,300 --> 00:38:49,920 You're just not going to state it publicly. 457 00:38:50,300 --> 00:38:51,400 We're not going to say that. 458 00:38:51,900 --> 00:38:55,860 Overall, this lovey system has a rating of X. 459 00:38:56,300 --> 00:38:57,720 But you're going to treat it that way. 460 00:38:57,880 --> 00:38:59,160 But we're still going to do inspections. 461 00:38:59,380 --> 00:39:02,800 And we're still going to look at all of the pieces of the inspection checklist. 462 00:39:03,440 --> 00:39:09,040 I'm just telling you that as I am reviewing this policy right now to, 463 00:39:09,820 --> 00:39:16,380 This is what the language is saying is that we will not come out with overall system and segment ratings, 464 00:39:17,140 --> 00:39:20,640 but we will still be doing inspections and looking at individual items. 465 00:39:22,320 --> 00:39:28,480 So, you know, for a long time we've had problems between the state and the core on concerning vegetation. 466 00:39:29,800 --> 00:39:38,100 Does this in any, and part of our, the state view is that the vegetation is a low-risk 467 00:39:38,100 --> 00:39:44,560 item compared to other things, you know, rodent action or whatever. 468 00:39:45,300 --> 00:39:51,500 Does this in any way acknowledge that the state's doing the right thing and doing the taking 469 00:39:51,500 --> 00:39:57,780 care of the riskiest things first and doing the less risky things, you know, later? 470 00:39:57,780 --> 00:39:59,780 This document sets up the conversation. 471 00:40:00,000 --> 00:40:16,580 For looking at risk and doing things in a worse first manner, this document does not speak to the actions of the State of California and it doesn't get into the changes to the inspection checklist or new inspection checklist. 472 00:40:19,620 --> 00:40:30,340 Well, still the bottom line is that these LMAs have to be. There are all of them at target has got to be their operating manuals. 473 00:40:30,340 --> 00:40:37,660 Absolutely, you know, basically is still what they're doing, so nothing is changing here in terms of that. 474 00:40:38,380 --> 00:40:43,900 That's, and that's, that goes along with the statement I read, and I'd like to you that we're not changing the operations of maintenance manuals here. 475 00:40:44,100 --> 00:40:47,440 We're just talking about the level of the safety policy and procedures. 476 00:40:47,900 --> 00:40:48,100 Okay. 477 00:40:49,440 --> 00:40:49,480 Okay. 478 00:40:49,480 --> 00:40:49,980 Please proceed. 479 00:40:50,700 --> 00:40:51,120 All right. 480 00:40:51,620 --> 00:40:59,620 The last volume talks about the shared information and the other groups that can use the information on the level of safety program. 481 00:40:59,620 --> 00:41:08,700 All right, so, you know, what are the next steps and how can you engage, how can be part of this, you know, this public review period? 482 00:41:09,680 --> 00:41:19,620 There is going to be a sponsor engagement session here in Sacramento, one of five throughout the country on March 26th. 483 00:41:20,240 --> 00:41:30,340 from one to four PM, the double tree by Hilton, on 2001 Point Westway, that's fairly close to the El Camino Office for Department of Law and Resources. 484 00:41:30,880 --> 00:41:36,740 Sessions are open to the public, with a target audience of 100 people. 485 00:41:37,520 --> 00:41:41,120 And those 100 people are sponsors, local maintain agencies, 486 00:41:43,160 --> 00:41:48,140 central and local control association, whoever, whoever is interested in this. 487 00:41:48,140 --> 00:41:52,460 This is being publicized across all of our core districts. 488 00:41:52,720 --> 00:42:00,540 So I imagine that it could be some sponsors from the Bay Area that make the track up to try to take part in this session. 489 00:42:03,920 --> 00:42:11,540 There are tickets that you have to get like RCP and sign up who you are to get a ticket to come to the session. 490 00:42:12,100 --> 00:42:17,260 As of this morning there were 89 seats left, 89 tickets left. 491 00:42:17,940 --> 00:42:22,640 I'll get you to the link at the end of the presentation for where you can go to sign up. 492 00:42:23,040 --> 00:42:30,020 I encourage folks to think about their organizations and who are the best folks to be there to engage in this conversation. 493 00:42:32,960 --> 00:42:38,800 So the objectives of the session are to provide the background probably similar to what I provided here during this presentation, 494 00:42:39,400 --> 00:42:45,960 but they will go into greater detail and probably have better answers for you on those things since they wrote the policy. 495 00:42:45,960 --> 00:43:01,420 It will cover the open comment period and how you can submit comments and then just have a chance to engage in to a conversation about about this document and about relationships with the Corps of Engineers and the Legislature Program. 496 00:43:02,700 --> 00:43:06,920 So you can see a basic agenda for what they've got. 497 00:43:07,360 --> 00:43:14,620 What the plan is, you can see some small group discussions on topics of interest over an hour with Q&A at the end. 498 00:43:15,540 --> 00:43:24,400 So I think your question about inspections and the bottom line, you know, be an issue when to bring up to that group. 499 00:43:25,620 --> 00:43:30,260 The outcome or the output of this public comment period is going to be an engineer's circular. 500 00:43:30,720 --> 00:43:35,080 Very similar to how the guidance document that we have for this section for weight program. 501 00:43:35,380 --> 00:43:37,980 It's been an engineering circular since 2014. 502 00:43:37,980 --> 00:43:40,240 Those have a two-year time frame, 503 00:43:42,280 --> 00:43:47,140 so those have an expiration date and they get updated over time based on feedback based on comments. 504 00:43:47,600 --> 00:43:54,040 So at the end, there is a target date for publishing this guidance. 505 00:43:54,240 --> 00:43:55,700 It's a July of this year. 506 00:43:56,520 --> 00:44:03,200 And then with the understanding that it will become an engineer circular, there will be a time to try it on. 507 00:44:03,340 --> 00:44:07,020 See how it works and provide comments while we are implementing that EC. 508 00:44:08,720 --> 00:44:10,060 So with that, 509 00:44:12,520 --> 00:44:17,320 here is the website where you can find information about that public engagement 510 00:44:17,320 --> 00:44:21,240 session, where you can go to sign up and get your ticket. 511 00:44:22,920 --> 00:44:26,160 And then if you're interested in just getting the document, that's probably the easiest 512 00:44:26,160 --> 00:44:26,840 place to go. 513 00:44:27,520 --> 00:44:33,160 If you just Google headquarters, or you say, let me say, this will be the link that comes 514 00:44:33,160 --> 00:44:33,820 up. 515 00:44:33,820 --> 00:44:39,580 If you're interested in actually putting comments in our public submitting comments, that's done 516 00:44:39,580 --> 00:44:43,300 through the federal register and the federal register docket numbers there on the screen. 517 00:44:43,860 --> 00:44:49,980 And then if you just have any general questions about the document, there is a email address 518 00:44:49,980 --> 00:44:54,280 staff at headquarters to answer questions about the policy. 519 00:44:57,320 --> 00:44:57,600 Okay. 520 00:45:02,160 --> 00:45:24,940 Well, thank you. I think you know, Mr. Larson coming to our board meetings that every single one of us in entire staff is interested in this as the state's sponsor of the system. We need to know that. So we wouldn't want to overwhelm your session with just floodboard folks. Is any of is there only one this one session? 521 00:45:25,540 --> 00:45:27,340 There are five sessions nationwide. 522 00:45:27,340 --> 00:45:35,720 nation-wide nation-wide five New Orleans Sacramento Portland Kansas City and Albany New York 523 00:45:35,720 --> 00:45:41,840 Okay, so this is one in California is any part of it like the opening presentation or anything going to be available as broadcast 524 00:45:41,840 --> 00:45:44,040 We could go on with all those 525 00:45:44,900 --> 00:45:49,060 Skype-y kind of things. It is not it's not it's a gonna be present 526 00:45:51,940 --> 00:45:53,320 Too bad go 527 00:45:56,930 --> 00:45:57,490 general 528 00:45:58,750 --> 00:46:01,390 after here and what you've had to say here 529 00:46:01,390 --> 00:46:09,490 I'm just, what do you feel that core headquarters hopes to achieve with what's their goal 530 00:46:09,490 --> 00:46:15,930 as far as this regulation, what are these things that they're going to change, is it just 531 00:46:15,930 --> 00:46:22,910 not as many inspections or what do you think, what are they trying to accomplish with this 532 00:46:22,910 --> 00:46:23,490 regulation? 533 00:46:23,490 --> 00:46:24,310 It's 534 00:46:31,760 --> 00:46:37,520 a layout, the policy and procedures associated with with how the core of engineers and 535 00:46:37,520 --> 00:46:45,280 our levee sponsors can meet the intent of the levee safety program, broadly, acknowledgment 536 00:46:45,280 --> 00:46:52,560 that it's not just operations and maintenance manual and looking at the levee system and documenting 537 00:46:52,560 --> 00:46:59,140 the performance issues with that levee system, but it's looking at at levee risk. 538 00:47:01,080 --> 00:47:08,720 And taking actions, the right actions, the most appropriate actions, to reduce risk of 539 00:47:08,720 --> 00:47:09,620 social development systems. 540 00:47:10,280 --> 00:47:12,480 They feel that's not happening now. 541 00:47:15,480 --> 00:47:19,800 Maybe I don't, I wouldn't say that, I would not say that they don't believe it's happening 542 00:47:19,800 --> 00:47:27,100 now, I would say that there is no policy document that would show how that gets done. 543 00:47:31,100 --> 00:47:41,260 Ryan, is there any reference to a preference for multi-benefit projects or things like in here? 544 00:47:43,580 --> 00:47:46,040 I don't believe so. I'm not sure. 545 00:47:46,760 --> 00:47:47,740 I don't know. 546 00:47:48,220 --> 00:47:52,300 Because that's obviously a priority of the administration. 547 00:47:53,620 --> 00:47:59,780 I think the state and we're all geared toward that. 548 00:47:59,780 --> 00:48:02,940 That would be important. 549 00:48:03,880 --> 00:48:09,680 Lastly, I would ask you to maybe brief the board a little bit on what the staff is doing 550 00:48:09,680 --> 00:48:16,040 to try to meet this 45 day period, or what is it, the public review period? 551 00:48:16,360 --> 00:48:24,640 60 day review period that concludes on April 27th, I believe, based on the published 552 00:48:24,640 --> 00:48:27,400 the document post on the register earlier this week. 553 00:48:28,660 --> 00:48:31,000 And, remember, Dolan, I would, 554 00:48:33,060 --> 00:48:38,860 there was one thing I did not mention that might meet your needs. 555 00:48:39,300 --> 00:48:43,640 There is a, there is a nationwide, there are two, 556 00:48:43,640 --> 00:48:49,960 nationwide webinars on Mark IV to give anybody the public, 557 00:48:51,060 --> 00:48:59,280 The chance to hear from Headquarters on the document, if you couldn't make it to the public session, 558 00:49:00,220 --> 00:49:11,700 those are on March 4th at 8 a.m. local and noon local and the instructions for how to sign into that webinar are also on that Headquarters, 559 00:49:11,700 --> 00:49:12,640 I'd love you safety website. 560 00:49:17,100 --> 00:49:17,580 Hey, Leslie. 561 00:49:18,700 --> 00:49:19,580 Thank you, Mr. President. 562 00:49:19,700 --> 00:49:22,300 Yes, we do have several staff members reviewing this. 563 00:49:22,480 --> 00:49:23,420 We are aware of the deadline. 564 00:49:23,760 --> 00:49:25,400 We've been coordinating with board member, 565 00:49:25,400 --> 00:49:28,560 a countryman, who I believe also has some independent comments 566 00:49:28,560 --> 00:49:31,400 and will be collecting those and submitting them. 567 00:49:31,900 --> 00:49:33,600 I would also ask any board members 568 00:49:33,600 --> 00:49:35,000 who are interested in attending. 569 00:49:35,540 --> 00:49:39,100 Would you please let me know so we can get tickets for you? 570 00:49:39,180 --> 00:49:39,480 OK. 571 00:49:39,660 --> 00:49:40,360 Thank you. 572 00:49:41,100 --> 00:49:57,560 All right, any board member who wants to attend this meeting, let Leslie know, Leslie are the comments on this document going to go through the board before they're submitted, or do you have the time to do that or not? 573 00:49:58,260 --> 00:49:59,360 For information purposes. 574 00:50:00,980 --> 00:50:09,880 Good line. No, that line is April 27. We could bring those to your March meeting if you would like. 575 00:50:10,120 --> 00:50:12,680 Just for your eye information, that might be helpful. 576 00:50:13,320 --> 00:50:15,720 Okay. Ryan, can we make sure we get that on the agenda? 577 00:50:18,340 --> 00:50:20,480 Okay. Any other questions for Ryan? 578 00:50:23,270 --> 00:50:23,470 Joe. 579 00:50:24,990 --> 00:50:25,210 Okay. 580 00:50:26,610 --> 00:50:29,030 Thank you, Ryan. Very much. 581 00:50:33,750 --> 00:50:35,170 Members were on item eight. 582 00:50:38,480 --> 00:50:40,480 Department of Water Resources under. 583 00:50:42,300 --> 00:50:49,000 Item 8A, we have our normal monthly report from the Department, Jeremy Erich, the Chief of 584 00:50:49,000 --> 00:50:53,840 the Division, Flood Management is here, and we'll present the report to the Board. 585 00:50:54,220 --> 00:50:54,640 Good morning, Jeremy. 586 00:50:55,300 --> 00:50:59,640 Good morning, President Edgar, members of the Board, Jeremy Erich, Chief of the Division 587 00:50:59,640 --> 00:51:01,640 of Flood Management for the Department of Water Resources. 588 00:51:03,700 --> 00:51:08,680 First I wanted to welcome Board Member Johnson on behalf of DWR, it was good talking to you 589 00:51:08,680 --> 00:51:12,140 board workshop a couple of weeks ago and we look forward to working with you so let us know 590 00:51:12,140 --> 00:51:19,580 how we can help. A couple of announcements I don't have slides for and I'll go into 591 00:51:19,580 --> 00:51:27,860 just a brief update today. As you may know the fiscal year federal fiscal year 2020 work plan 592 00:51:27,860 --> 00:51:33,640 came out a couple of weeks ago and I just wanted to congratulate the the Samwalking Area 593 00:51:33,640 --> 00:51:38,820 flood control agency on their recent, recent success, the Lower San Joaquin River, California 594 00:51:38,820 --> 00:51:46,680 Project, received one of two nationwide new starts to implement the authorized Lower San Joaquin 595 00:51:46,680 --> 00:51:51,080 River Feasibility Study Project that was worked on for a long period of time. 596 00:51:51,940 --> 00:51:57,420 So congratulations to Sajafka on that, good news, the core through the work plan appropriated 597 00:51:57,420 --> 00:52:00,880 $22.8 million for them to begin that construction. 598 00:52:00,880 --> 00:52:06,660 And so we'll hear more about that in upcoming months. 599 00:52:08,880 --> 00:52:15,300 The second announcement, DWR, board staff, and Sacramento area, Floor Control Agency have 600 00:52:15,300 --> 00:52:19,540 been coordinating on a federal advocacy trip that we're going to next week. 601 00:52:20,680 --> 00:52:27,380 So we'll be traveling Darren soon and myself, Gary Lippner, Laura Hollander, from DWR and 602 00:52:27,380 --> 00:52:30,060 and a couple of folks from Sacramento area 603 00:52:30,060 --> 00:52:35,000 for a control agency will be going to talk about three main issues. 604 00:52:36,420 --> 00:52:41,300 The YOLA bypass partnership program as you're familiar with, 605 00:52:41,740 --> 00:52:45,440 we're going to be talking about the idea of new federal legislation 606 00:52:47,160 --> 00:52:51,160 to bolster the core as ability to work with us 607 00:52:51,160 --> 00:52:55,120 on the YOLA bypass partnership and look at new ways for them 608 00:52:55,120 --> 00:52:58,860 to consider different kinds of benefits in their valuations 609 00:52:58,860 --> 00:53:00,520 as the core as a critical partner, 610 00:53:00,960 --> 00:53:03,840 in all of our projects, the old bypass notwithstanding. 611 00:53:04,240 --> 00:53:09,620 So we want to get them in there at the table with a, 612 00:53:09,620 --> 00:53:12,080 you know, and provide a meaningful role 613 00:53:12,080 --> 00:53:15,760 and help them be successful as we all work toward that effort. 614 00:53:16,740 --> 00:53:20,880 The second item is the federal fiscal year 2021, 615 00:53:21,000 --> 00:53:22,540 federal appropriations requests. 616 00:53:22,540 --> 00:53:31,600 So the President's proposed budget came out, also a couple weeks back, and so there's some requests in there to supplement some of that through the work plan process. 617 00:53:32,760 --> 00:53:38,140 And then finally, a request extension of the 2024 deadline for the use of excess credits. 618 00:53:39,980 --> 00:53:52,260 So more to come, maybe we can report back after that trip, but we look forward to that, to get opportunity for us as a collective state and local partnership to go and advocate together. 619 00:53:59,140 --> 00:54:04,180 So for my other updates today, I'm going to give a quick update on small communities. 620 00:54:05,160 --> 00:54:11,720 I didn't realize when I prepared the presentation that the second item here, the storm damage emergency rehab program update, 621 00:54:12,000 --> 00:54:14,420 is actually a separate agenda item I thought it was part of my update. 622 00:54:14,960 --> 00:54:19,660 So I have one slide on that just to steal a little bit of thunder from Dave Wildin and give you a preview, 623 00:54:20,380 --> 00:54:22,220 but I won't spend too much time on that. 624 00:54:22,260 --> 00:54:24,180 And then Dr. Mike Anderson is here. 625 00:54:24,180 --> 00:54:29,400 these are state climatologists, and so he'll give you our monthly winter time word from our 626 00:54:29,400 --> 00:54:33,280 state climatologist, although it doesn't seem like it's winter right now. 627 00:54:35,320 --> 00:54:40,100 So a quick update on the small communities program, and I think for the benefit of more 628 00:54:40,100 --> 00:54:44,600 member Johnson, if you don't mind, I'll just give like a really quick overview. 629 00:54:44,760 --> 00:54:50,560 We've done a number of updates on this grant program over the past several months, but 630 00:54:50,560 --> 00:54:56,080 In the 2012 and 2017 CentroFiveFive Protection Plan, we identified urban improvement needs, 631 00:54:56,080 --> 00:54:58,540 rural improvement needs, and system light improvement needs. 632 00:54:59,000 --> 00:55:00,000 This program is a... 633 00:55:00,000 --> 00:55:05,820 The result of some of the rural improvements that we want to do in some of the small communities that 634 00:55:05,820 --> 00:55:12,720 aren't urbanizing areas at this point. So we went out with a phase one process where we 635 00:55:12,720 --> 00:55:21,500 need to be our funded 35 local communities to develop feasibility studies for what they identify 636 00:55:21,500 --> 00:55:25,680 their problems and opportunities and come up with some solutions that they want to look at moving 637 00:55:25,680 --> 00:55:31,280 forward. So it's really, the focus has been on the urban areas in the past, you know, 638 00:55:31,440 --> 00:55:35,960 few decades and we haven't had the time or resources to address the small communities. 639 00:55:36,020 --> 00:55:44,460 So this was a program to move that ball forward. The phase one process is wrapping up. Some 640 00:55:44,460 --> 00:55:51,080 of the communities needed more time so they've extended their agreements with us. I think 15 or 20 641 00:55:51,080 --> 00:55:57,680 are wrapping up, have wrapped up already of the 35 in the phase one, feasibility study process. 642 00:55:58,560 --> 00:56:02,840 And then we've already started implementing phase two, which is the implementation of some 643 00:56:02,840 --> 00:56:03,600 of those projects. 644 00:56:05,840 --> 00:56:11,920 So the phase two solicitation period for our proposal solicitation package we put out was 645 00:56:11,920 --> 00:56:13,820 December 5th through February 3rd. 646 00:56:13,820 --> 00:56:18,300 So February 3, the application period closed for Phase 2. 647 00:56:20,380 --> 00:56:27,460 The table here shows the five communities that applied for Phase 2 funding, Grimes, 648 00:56:27,540 --> 00:56:30,960 Knights Landing, Tudor, Wheatland, and Franklin Beachwood in Merced County. 649 00:56:33,040 --> 00:56:37,920 Part of our guidelines allowed them flexibility to pick from a menu of options as they 650 00:56:37,920 --> 00:56:38,920 put together their applications. 651 00:56:38,920 --> 00:56:44,120 As I've mentioned before, we only have about 28 million dollars available for implementation, 652 00:56:45,140 --> 00:56:50,420 and there's probably at least a $2 billion need out there in the system based on our 653 00:56:50,420 --> 00:56:52,000 certified foot protection plan estimates. 654 00:56:53,520 --> 00:56:55,180 That's a B billion. 655 00:56:57,440 --> 00:57:03,320 So with 28 million available, these five projects came in, and if you were to implement these 656 00:57:03,320 --> 00:57:06,960 five projects in their entirety, it's over $300 million worth of work. 657 00:57:06,960 --> 00:57:09,140 So obviously, we're not going to be able to fund that. 658 00:57:09,380 --> 00:57:13,940 So what we're looking at is, and the local communities that the communities that applied 659 00:57:13,940 --> 00:57:18,340 for the phase two funding, they did leverage that flexibility in the guidelines and they 660 00:57:18,340 --> 00:57:20,740 proposed different options for the department to consider. 661 00:57:20,900 --> 00:57:26,660 So we appreciate them in their flexibility because it's really tough to fund $300 million 662 00:57:26,660 --> 00:57:28,820 of work with $28 million. 663 00:57:29,800 --> 00:57:34,180 So we're in the review process there for that for those five applications. 664 00:57:35,140 --> 00:57:42,240 We're on a fast burn with this review process because our prop 1E funding commitment deadline is June 30 this year. 665 00:57:42,720 --> 00:57:49,580 So we're looking to complete our reviews by the end of March and make some recommended awards to our director. 666 00:57:49,960 --> 00:57:56,160 And then from there we hope to get our final awards out by the end of April for that 15-day comment period. 667 00:57:56,300 --> 00:58:01,740 And then we'll be working on contracts to tie that funding up over the next couple of months. 668 00:58:03,310 --> 00:58:07,310 Any questions on small communities for I move on? 669 00:58:09,240 --> 00:58:10,200 Any questions? 670 00:58:11,600 --> 00:58:11,620 Okay. 671 00:58:14,340 --> 00:58:19,040 Just real quick on the 2017-2019 storm damage emergency rehabilitation program. 672 00:58:21,040 --> 00:58:26,460 As a reminder, the Center of I Water Sheds experienced record rainfall in 2017 and 2019. 673 00:58:27,300 --> 00:58:32,040 They run off from these storms cause a lot of damage to our levy systems, particularly in 2017. 674 00:58:32,040 --> 00:58:37,320 And as a result, back in 2017, the State Legislature redirected some of the deferred maintenance 675 00:58:37,320 --> 00:58:44,700 funding that was provided to DWR to address the storm damage that we experienced. 676 00:58:46,040 --> 00:58:50,800 So DWR quickly organized under the leadership of Dave Wildin, who will talk to you a little 677 00:58:50,800 --> 00:58:56,760 bit later in more detail, organized and multi-agency effort to identify, prioritize, and repair 678 00:58:56,760 --> 00:58:57,880 these sites. 679 00:58:59,400 --> 00:59:11,820 Dave has provided several updates. It's been a while, so we thought it would be good to come back and provide kind of a reminder of where we've been over the past couple of years and then a status of what some of these repairs are looking like and how much more work is left. 680 00:59:14,460 --> 00:59:23,040 And there is a lot of work to be done. We have accomplished all 38 critical sites have been repaired. There's more work to be done. 681 00:59:24,040 --> 00:59:33,060 But I just want to give Kudos and a big thank you to Dave, his leadership and the multi-agency team that has helped to Dave be successful in this program. 682 00:59:33,520 --> 00:59:35,760 There were a couple of awards that I noted up here on the slide. 683 00:59:36,760 --> 00:59:41,040 The American Society of Civil Engineers 2017 Project of the Year Award for this program. 684 00:59:42,140 --> 00:59:47,700 As well as the American Council of Engineering Companies 2019 Engineering Excellence Merit Award. 685 00:59:48,260 --> 00:59:50,320 So the team should be very proud of their work. 686 00:59:50,320 --> 00:59:54,240 I'm proud of the work they've done and more to come on that. 687 00:59:57,260 --> 00:59:59,940 That's it for me unless there are any questions I'd like to bring in Mike. 688 01:00:00,000 --> 01:00:28,240 Anderson up. In the interest of time, the last slide that Michael probably clicked to will be our next scheduled program briefing for March is Todd Bernardi will come and talk about our flood risk reduction projects, specifically the US Army Corps of Engineers projects, give you an update on construction completed last year and the plans for this upcoming year and future plans for construction. So that should be good update for everybody on the urban program. 689 01:00:30,000 --> 01:00:31,780 I have a question. 690 01:00:33,060 --> 01:00:38,300 In reading the report that was submitted to the board, not what you just talked about, 691 01:00:39,380 --> 01:00:49,680 I didn't see very much work that was being done by the state on repairing rodent activity. 692 01:00:50,840 --> 01:00:55,100 And I'm wondering is there a problem getting fish and wildlife service approval 693 01:00:55,100 --> 01:01:01,320 because of the garter snake is why they seem to be a lack of activity in this area or where 694 01:01:01,320 --> 01:01:05,920 are we with that? We worked out something with Fish and Wildlife Service on the garter snake. 695 01:01:07,300 --> 01:01:12,360 That's a good question. I think in some areas we don't have issues with the garter snakes 696 01:01:12,360 --> 01:01:17,820 that we're able to continue doing that kind of work. I can't answer your question indeed 697 01:01:17,820 --> 01:01:22,280 today and I don't have our flood maintenance officer. I don't believe today. But we can come back 698 01:01:22,280 --> 01:01:27,360 next month and kind of give you a test problem we need to be because when we look at the inspection 699 01:01:27,360 --> 01:01:33,340 reports that seems to be like one of the biggest items that is recurring over and over by the 700 01:01:33,340 --> 01:01:39,580 core and by our own inspectors yet I don't see much activity yeah I mean we're constantly working 701 01:01:39,580 --> 01:01:44,280 with the official wildlife agencies on this issue it's been a longstanding issue as you as you 702 01:01:44,280 --> 01:01:49,200 imagine I look forward to hearing from you yeah we appreciate that question and I'll try to get 703 01:01:49,200 --> 01:01:54,540 information for you next time. Thank you, Jeremy. Thank you all. So I'll bring up Dr. Mike 704 01:01:54,540 --> 01:01:54,880 Anderson. 705 01:01:57,680 --> 01:02:04,440 You were on the queue here. I clean well. All right, President Edgar in the board. 706 01:02:04,580 --> 01:02:12,600 Good morning. Hi, Michael. All right, what are your 2020 to date? When I was here in December, 707 01:02:12,600 --> 01:02:18,580 mentioned that the outlook was dry. This is how it has realized through the winter. We were 708 01:02:18,580 --> 01:02:24,780 transportation in snowpacker, hang an out near 50% for the central valley water sheds. 709 01:02:25,800 --> 01:02:30,520 Maximum temperatures in the top quartile with minimum temperature in the top 10%. 710 01:02:30,520 --> 01:02:41,060 So we are seeing that warmer, drier pattern that has been more present than not in the past decade. 711 01:02:42,740 --> 01:02:45,180 Some record territories, some discussions to have. 712 01:02:45,180 --> 01:02:49,440 So I think last time I told you we had a potential sea level pressure record. 713 01:02:49,500 --> 01:02:55,880 We have an extreme committee formed, and they are reviewing the data and preparing a report 714 01:02:55,880 --> 01:02:58,660 for consideration by NCEI for that record. 715 01:02:59,660 --> 01:03:05,320 You may have also seen news reports on February 9th of a wind reading of 299 miles an hour 716 01:03:05,320 --> 01:03:06,360 up at Kirkwood. 717 01:03:07,020 --> 01:03:14,000 We have investigated that reading and find we do not have sufficient information to pursue 718 01:03:14,000 --> 01:03:20,360 updating the record at this time. The precipitation indices, the aid station, the 719 01:03:20,360 --> 01:03:27,740 five station in the sixth station are at or near-record lows for February and also 720 01:03:27,740 --> 01:03:33,960 currently for water year to date. And six of the 21st century snow packs 721 01:03:33,960 --> 01:03:39,860 for April 1 are less than or equal to 50% of average. So again, kind of fitting into 722 01:03:39,860 --> 01:03:46,780 the narrative with climate change, less snow, more extremes, more variability. 723 01:03:50,710 --> 01:03:54,150 Looking with the national multi-model ensemble, which is the graphic there. 724 01:03:54,170 --> 01:03:56,670 This is the outlook from our chapel in May. 725 01:03:57,010 --> 01:04:03,290 And again, you see a good part of California in the below-average category for the three 726 01:04:03,290 --> 01:04:04,290 month accumulation. 727 01:04:05,190 --> 01:04:10,150 What I do want to caution is that March is still a month where significant precipitation 728 01:04:10,150 --> 01:04:16,790 can happen. And one storm can produce fish of flows to cause high water even if the seasonal 729 01:04:16,790 --> 01:04:22,610 accumulation remains below average. So we do need to be mindful that you can have a wet 730 01:04:22,610 --> 01:04:25,910 extreme within a broader dry extreme environment. 731 01:04:29,000 --> 01:04:31,720 And that's all I have for you today any questions? 732 01:04:33,380 --> 01:04:39,220 Questions on the climate change report? Pretty grim for a drought, huh? 733 01:04:40,800 --> 01:04:42,680 We seem to be back in that territory. 734 01:04:43,120 --> 01:04:44,280 Yeah, it looks like it. 735 01:04:44,460 --> 01:04:44,500 Okay. 736 01:04:44,640 --> 01:04:45,220 Thank you, Michael. 737 01:04:45,500 --> 01:04:46,340 Thank you. 738 01:04:48,710 --> 01:04:49,990 Anything else for me? 739 01:04:54,460 --> 01:04:55,460 Oh, Tim, you want? 740 01:04:59,250 --> 01:04:59,770 Just real quick. 741 01:04:59,950 --> 01:04:59,990 Thanks. 742 01:05:00,000 --> 01:05:06,880 Mr. Jeremy, the report that we get in writing that has the top conservation conditions at the reservoirs in the state. 743 01:05:07,400 --> 01:05:11,080 There's another version of that with the snow pack on it. Also, it needs to be in the report. 744 01:05:11,160 --> 01:05:15,100 Can you guys throw that back in when you do the monthly versions? I just like that one also. 745 01:05:15,460 --> 01:05:17,180 It has the rest of the information on it. 746 01:05:17,300 --> 01:05:19,400 Yes, that makes sense. Great. Thank you. 747 01:05:19,600 --> 01:05:19,740 Thank you. 748 01:05:19,820 --> 01:05:20,740 Appreciate it. 749 01:05:21,400 --> 01:05:22,120 Anybody else? 750 01:05:24,340 --> 01:05:24,360 Okay. 751 01:05:26,080 --> 01:05:27,620 Okay, under, thank you, Jeremy. 752 01:05:28,340 --> 01:05:29,560 Under item, 753 01:05:31,600 --> 01:05:32,500 we're on AB, 754 01:05:37,470 --> 01:05:37,470 Mary. 755 01:05:38,590 --> 01:05:45,030 Mary is going to provide us with a little kind of summary of what we did in our workshop on climate change. 756 01:05:45,830 --> 01:05:55,350 And then the next steps to kind of upgrade the information that we had in the 2017 update of the plan. 757 01:05:55,350 --> 01:06:02,710 and then what we're looking forward to as an approach to the 2020-22 update. 758 01:06:05,570 --> 01:06:08,250 Good morning and thank you, President and Gurn members of the Board. 759 01:06:08,710 --> 01:06:13,590 Please to be here today on behalf of the Center of Olive Flip Protection Plan DWR team. 760 01:06:17,920 --> 01:06:24,340 We enjoyed a four-hour long and productive workshop with many of you and our 761 01:06:24,340 --> 01:06:27,940 value stake holders on February 14th at the City of West Sacramento. 762 01:06:28,900 --> 01:06:35,920 We had approximately 60 attendance, a 60 people in attendance, including board members, leads 763 01:06:35,920 --> 01:06:40,740 from the San Joaquin Regional Flood Management Planning Groups, local flood protection agencies, 764 01:06:41,100 --> 01:06:46,700 environmental, non-governmental organizations or NGOs, resource agencies and landowners. 765 01:06:47,280 --> 01:06:50,100 We had a very nice variety of participants there. 766 01:06:50,780 --> 01:06:56,540 The purpose of the workshop on the 14th was to foster a shared understanding of the San 767 01:06:56,540 --> 01:07:02,460 Joaquin Basin Problems, Climate Change Findings, Range and Solution Study and Recommendations 768 01:07:02,460 --> 01:07:05,200 from the 2017 Flunk Protection Plan Update. 769 01:07:05,420 --> 01:07:10,220 We had a robust body of work that supported that and we wanted to use that as a launching 770 01:07:10,220 --> 01:07:15,260 point to work toward shared understanding of our current climate change-related studies 771 01:07:15,260 --> 01:07:22,300 that were proposed for the 2022 flood protection plan update and begin to engage and receive input 772 01:07:22,300 --> 01:07:28,060 in a public setting on our proposed San Joaquin Basin climate change approaches for the flood plan update. 773 01:07:32,420 --> 01:07:37,140 So, in overview of the presentation topics that we presented in much greater detail to weeks ago, 774 01:07:39,840 --> 01:07:46,720 we had an overview of the challenges, findings, and recommendations from the 2012 and 2017 flood protection plan. 775 01:07:48,220 --> 01:07:53,880 Using that, again, as a launching point to work toward our 2022 flood protection plan update. 776 01:07:55,920 --> 01:07:58,720 And that was focused on a couple of things. 777 01:07:59,200 --> 01:08:05,260 One is the recognition that the San Joaquin River Basin is expected to face severe climate change impacts, 778 01:08:05,940 --> 01:08:08,860 and we are gaining a better understanding of that over time. 779 01:08:09,880 --> 01:08:13,540 The second is that there are a suite of multi-benefit recommended actions, 780 01:08:13,540 --> 01:08:18,100 included for the San Joaquin Basin in the Central Value Flood Protection Plan that was adopted 781 01:08:18,100 --> 01:08:19,520 by the board in 2017. 782 01:08:22,080 --> 01:08:26,020 We want to use that to assess a broader range of climate change 783 01:08:26,020 --> 01:08:33,500 projections and flood system vulnerabilities to climate change moving towards 2022. Explore 784 01:08:33,500 --> 01:08:43,320 integration and add up to explore the integration of various adaptation strategies with decision 785 01:08:43,320 --> 01:08:46,640 analysis to reflect the changes that we know are occurring in the system. 786 01:08:52,120 --> 01:08:54,940 Here's just a sublist of the key feedback provided. 787 01:08:55,040 --> 01:08:58,340 There was a lot of great feedback and we're digging into it as we speak. 788 01:08:59,000 --> 01:09:01,260 About a summary for you up there. 789 01:09:01,600 --> 01:09:05,840 There are significant sermons expressed regarding the range and climate change projections. 790 01:09:06,440 --> 01:09:07,440 It's a wide range. 791 01:09:08,120 --> 01:09:11,280 We all looked at a scatter plot that raised some eyebrows. 792 01:09:12,580 --> 01:09:17,100 But related to that is there is great uncertainty amongst all of our partners 793 01:09:17,100 --> 01:09:20,920 on how to respond and where to invest, so we want to continue the dialogue on that. 794 01:09:22,120 --> 01:09:26,020 There's an interest in integrating flood management into other efforts, recognizing that 795 01:09:26,020 --> 01:09:31,060 often groundwater management and habitat restoration needs are at the forefront of people's 796 01:09:31,060 --> 01:09:32,300 minds in the San Joaquin. 797 01:09:33,540 --> 01:09:37,920 There were requests for a peer review of our climate change analyses that we are working on now. 798 01:09:38,580 --> 01:09:47,080 We had a discussion of how upstream actions affect downstream areas and communities in the 799 01:09:47,080 --> 01:09:51,780 challenge and barriers to implementation that are unique to the San Joaquin basin. 800 01:09:52,240 --> 01:09:59,940 Some of those are common to the Sacramento as well, but it definitely presents the focus challenge. 801 01:10:00,000 --> 01:10:06,020 In the San Joaquin, in different ways. So some of the challenges and barriers that we discussed in more detail 802 01:10:06,020 --> 01:10:14,480 two weeks ago included a lack of funding, limited institutional capacity, concerns about hydraulic impacts, 803 01:10:15,240 --> 01:10:22,180 why is use of floodplain issues in the San Joaquin, real estate issues and availability of real estate 804 01:10:22,180 --> 01:10:24,960 and how to garner land on a support. 805 01:10:26,300 --> 01:10:34,280 The U.S. Army Corps of Engineers for a wait process and state plant-of-flow control issues and the long-term nature of system-wide projects. 806 01:10:39,770 --> 01:10:42,210 So this is near the end and I'll pause for questions. 807 01:10:42,530 --> 01:10:46,550 But what's happened since February 14th for our planning team and what's next? 808 01:10:47,350 --> 01:10:53,670 We had a targeted engagement with the San Joaquin Regional Flood Management Planning Leeds on February 21st. 809 01:10:53,670 --> 01:11:00,830 I found it personally to be a very productive and meaningful use of time with the leads to hear more about their concerns and priorities. 810 01:11:02,830 --> 01:11:15,230 Regional flood management planning update was given to the Coordinating Committee to days ago by Chris Williams and the leads from the six regional flood management planning efforts in the Valley Sacramento and San Joaquin. 811 01:11:15,690 --> 01:11:20,450 And so what's coming next, we're working toward a summary of this climate change workshop 812 01:11:20,450 --> 01:11:26,110 to continue the engagement with our San Joaquin stakeholders at the March Coordinating Committee 813 01:11:26,110 --> 01:11:31,030 that I'm told is being planned for a location in the San Joaquin Basin to be determined. 814 01:11:31,350 --> 01:11:36,030 So we're hoping to get some additional folks to attend and engage with us there who weren't able 815 01:11:36,030 --> 01:11:41,690 to make the trek up to West Sacramento. And we are eager to begin engagement on our vision 816 01:11:41,690 --> 01:11:44,450 for the conservation strategy update, vision as well. 817 01:11:45,130 --> 01:11:46,510 So that will be coming soon. 818 01:11:48,560 --> 01:11:51,680 With that, I'll pause for questions. 819 01:11:52,720 --> 01:11:53,020 For comments. 820 01:11:53,260 --> 01:11:57,020 It's very, we had a little discussion 821 01:11:57,020 --> 01:11:59,220 about that at the coordinating committee, 822 01:11:59,400 --> 01:12:00,580 and then, of course, at the workshop. 823 01:12:01,340 --> 01:12:04,040 I think there are two areas that we need 824 01:12:04,040 --> 01:12:06,420 to get some policy guidance on. 825 01:12:07,240 --> 01:12:11,420 One is this whole issue of, it looks like Roman 826 01:12:11,420 --> 01:12:20,180 and the climate people are headed toward determining kind of a range rather than a specific 827 01:12:20,180 --> 01:12:25,060 number for the, you know, 828 01:12:28,300 --> 01:12:32,340 what they, you know, you're going to have to design to 829 01:12:32,340 --> 01:12:42,540 in this San Joaquin Valley. And I need to know how exactly we're going to deal with that. 830 01:12:42,540 --> 01:12:50,760 In other words, is the state saying that this is the range that we think climate change is going 831 01:12:50,760 --> 01:13:00,720 to affect Santa and the locals have the ability to pick a design number to design 832 01:13:00,720 --> 01:13:07,140 too within that range and that's their choice, or are we going to determine it, or what? 833 01:13:07,920 --> 01:13:10,560 That's a great question and it had come up two weeks ago. 834 01:13:10,780 --> 01:13:15,500 We are planning on presenting a range and we are saying that it is up to the locals to 835 01:13:15,500 --> 01:13:22,220 determine their design level to how far they would think they can go within any one 836 01:13:22,220 --> 01:13:24,820 project and accommodating projection of climate change. 837 01:13:25,000 --> 01:13:32,420 We do hope that the range will start to hone down where we think a reasonable space for the 838 01:13:32,420 --> 01:13:36,220 future given a large range of uncertainty to help guide that but we are certainly not going 839 01:13:36,220 --> 01:13:42,340 to make that decision for the locals, but secondly, we want to be able to flip the 840 01:13:42,340 --> 01:13:43,780 near to that adaptation. 841 01:13:44,200 --> 01:13:45,140 Has that been determined? 842 01:13:45,720 --> 01:13:47,800 That is the state policy at this point. 843 01:13:48,160 --> 01:13:55,560 That the state's position is that we will produce the numbers that will produce a range 844 01:13:55,560 --> 01:14:02,000 and that the locals have the choice to work within that range. 845 01:14:02,420 --> 01:14:02,800 Yes. 846 01:14:03,360 --> 01:14:05,460 Is that what the policy is at this point? 847 01:14:05,460 --> 01:14:11,340 My understanding yes, all right, 848 01:14:14,920 --> 01:14:20,900 the second issue while while we're getting issues on the table is is it seems to me that 849 01:14:23,020 --> 01:14:30,300 I'm a little worried about we spent a lot of time integrating the conservation strategy in the metrics 850 01:14:30,880 --> 01:14:31,680 into 851 01:14:31,680 --> 01:14:32,960 the plan 852 01:14:32,960 --> 01:14:34,000 during the 853 01:14:34,000 --> 01:14:38,900 2017 and it looks like now we're gonna be producing a 854 01:14:38,920 --> 01:14:42,360 according to Lorie at the Department, 855 01:14:44,680 --> 01:14:49,640 a conservation strategy update or a paper of some sort 856 01:14:49,640 --> 01:14:52,640 that will be produced in 2021, 857 01:14:53,680 --> 01:14:58,120 which will inform the writing of the plan in 2022. 858 01:15:00,000 --> 01:15:07,660 A little worried about that we're bifurcating the plan and the conservation strategy again. 859 01:15:08,420 --> 01:15:16,100 And I really, a lot of us broke our picks on trying to pull it together and make sure it was in the plan. 860 01:15:16,260 --> 01:15:22,600 It was our policy in the plan as part of the conservation strategy was in the plan. 861 01:15:22,600 --> 01:15:30,640 And I'm sensing it, this is kind of bifurcating again, and it's moving away, so we need 862 01:15:30,640 --> 01:15:36,540 to make sure that that doesn't happen, because that would be a mistake, would go back 863 01:15:36,540 --> 01:15:41,820 to where we were before, where we have a conservation strategy, and we have the flood plan, 864 01:15:41,820 --> 01:15:46,960 and we're constantly trying to make a mesh together, and we don't want that. 865 01:15:47,100 --> 01:15:48,780 We want to integrate it. 866 01:15:49,140 --> 01:15:49,300 Right? 867 01:15:49,300 --> 01:15:53,980 I agree with you. The team has been thinking through the most efficient way to make sure 868 01:15:53,980 --> 01:15:59,320 that happens and that's why Laurie mentioned one thinking is a light, a relatively light 869 01:15:59,320 --> 01:16:04,120 document that's easy to plug in to the main narrative of the plan. So we're trying to think 870 01:16:04,120 --> 01:16:08,720 through creatively how to make sure that that connection is as tight as possible. That being said, 871 01:16:08,780 --> 01:16:14,940 it is one of the key multiple supporting efforts we need to integrate in. So we are trying 872 01:16:14,940 --> 01:16:18,920 to think of it in that way, in terms of it is integral part of the flood plan. 873 01:16:20,160 --> 01:16:24,020 The back to the climate change range again. 874 01:16:25,580 --> 01:16:30,000 So, Jeff is now taking the position that they are. 875 01:16:30,000 --> 01:16:38,400 Their policy basically is managing climate change by adaptive management. 876 01:16:38,400 --> 01:16:47,200 that is they're going to build their levies stronger so that they can be raised in the future 877 01:16:47,200 --> 01:17:00,460 if the higher end of the range begins to emerge as reality. But if you do the math and they get 878 01:17:00,460 --> 01:17:06,900 to that high range they're going to need more than just raising the top of the levies. They're 879 01:17:06,900 --> 01:17:15,600 need essentially a bypass or something that takes a whole bunch of water out to the ocean. 880 01:17:17,960 --> 01:17:28,460 I don't know how we adaptively manage for that ultimate possibility except for buying land. 881 01:17:30,280 --> 01:17:41,240 Well, that's the question, is it going to, are we going to, you know, the way I'm seeing 882 01:17:41,240 --> 01:17:47,820 it now, Sadjavka is planning to manage climate change by adaptive management, which means 883 01:17:47,820 --> 01:17:53,240 raising the levies over time as they need it. 884 01:17:53,240 --> 01:18:04,300 But at some point, if the end of the range begins to become reality, they're going to need more than just raising the levee. 885 01:18:04,380 --> 01:18:11,260 So they're going to need a channel or something to transport all that water out of the area. 886 01:18:12,640 --> 01:18:20,200 Now, the question is, what are we doing, or is that number one? I guess we need to know whether that's correct or not. 887 01:18:20,200 --> 01:18:24,980 Number two, if it is, what's the strategy? 888 01:18:25,020 --> 01:18:28,800 Is it to begin to generally buy land or work? 889 01:18:29,300 --> 01:18:31,680 So that was what was occurring to me 890 01:18:31,680 --> 01:18:33,700 as we were talking about that. 891 01:18:34,420 --> 01:18:36,860 Yes, one thing we talked about with the San Joaquin 892 01:18:36,860 --> 01:18:41,100 RFMPs was whether Sajafka is looking at giving more room 893 01:18:41,100 --> 01:18:44,060 and they talked about a corridor outside their levy projects. 894 01:18:44,220 --> 01:18:47,240 What other adaptations strategies should they be looking 895 01:18:47,240 --> 01:18:54,120 next. In a prioritized manner to adaptively managed toward climate change and that could be a whole host 896 01:18:54,120 --> 01:19:00,460 of other things in the toolbox, as you mentioned, including looking at the non-structural actions, 897 01:19:00,600 --> 01:19:06,340 easements and so forth, land use, reservoir operations, what can be done there. So there are whole 898 01:19:06,340 --> 01:19:11,300 host of other tools in the toolbox that need to be studied at a more detailed level. And so one of 899 01:19:11,300 --> 01:19:16,040 the things that we're doing with the climate change is starting to develop these watershed-based approaches 900 01:19:16,040 --> 01:19:21,520 that allow you to focus in a little better on particular geographies and understand within that 901 01:19:21,520 --> 01:19:27,520 watershed downstream, which adaptation strategies work a little better for you and get you a 902 01:19:27,520 --> 01:19:34,880 little further. And so how can you prioritize? It's hard to do that for for region scale geographies 903 01:19:34,880 --> 01:19:39,860 looking at the whole system. So how can we move towards individual watersheds and studying them 904 01:19:39,860 --> 01:19:45,660 with partners and picking them off in a prioritized manner to work towards that so that there 905 01:19:45,660 --> 01:19:50,560 individual projects that begin to make sense at a watershed scale that she's that people can 906 01:19:50,560 --> 01:19:55,840 start to realize oh we can only get so far with this urban project so the next thing we need to 907 01:19:55,840 --> 01:19:59,980 looking at is X, Y, and Z and I don't have that answer for you first talk. 908 01:20:00,000 --> 01:20:05,120 But we do want to work through with our partners how to get to that. 909 01:20:05,380 --> 01:20:13,740 Okay. Now, if you're idea that some of this is going to be just some of this detail is going to be written into the plan update. 910 01:20:14,420 --> 01:20:25,340 What we are integrating into the floodblood plan update for climate change are the pilot studies that we are completing on a to all of me and Merced as pilots as examples of ways that you can do it. 911 01:20:25,340 --> 01:20:29,320 or tailored, so to speak, because if you were at the workshop, you'll see that those two are 912 01:20:29,320 --> 01:20:30,140 a little different. 913 01:20:32,620 --> 01:20:37,040 But we will need to do a lot more moving toward 2027 talking about 914 01:20:37,040 --> 01:20:40,240 what other watersheds can we look at, what can we learn, how can we partner? 915 01:20:40,700 --> 01:20:47,640 Okay, the question is, how much are we asking, Sajafka to do and how much are we going to do? 916 01:20:48,440 --> 01:20:51,940 That's, I guess, the balance here. Okay, Tim. 917 01:20:55,080 --> 01:20:56,060 Thanks for the update. 918 01:20:56,320 --> 01:20:59,200 I wish I had been a fly in the wall for the RFMP meeting, but oh well. 919 01:20:59,680 --> 01:21:00,740 I'm glad you guys had that discussion. 920 01:21:02,380 --> 01:21:07,820 Let me first say thanks for giving this the time and attention that I think we all want to provide. 921 01:21:08,500 --> 01:21:09,620 The workshop was great. 922 01:21:09,960 --> 01:21:14,540 I'm really happy to see so much effort going into what happens on the Selma King side of the system. 923 01:21:15,280 --> 01:21:18,780 There were a few presenters to weeks ago, but there were a lot of people I'm sure that helped prepare. 924 01:21:19,840 --> 01:21:21,760 So, a big thanks to everybody that was part of that team. 925 01:21:23,020 --> 01:21:31,580 just a couple of quick comments to maybe echo some of the things that Bill said going forward to try to think about besides that's who you had on the screen. 926 01:21:32,500 --> 01:21:37,900 One way to look at the update would be to assess the 2017 priorities, right? 927 01:21:38,260 --> 01:21:39,820 And the priority for the sound machine was the bottom. 928 01:21:41,540 --> 01:21:48,240 And I think this is happening, but we should be really explicit about not just what we think needs to happen, 929 01:21:48,240 --> 01:21:52,020 but why it hasn't happened so we can try to get our head around that and figure out who needs 930 01:21:52,020 --> 01:21:57,160 to be responsible for it. Hopefully we'll do more than just to point out problems. We'll try to 931 01:21:57,160 --> 01:21:58,780 also point out paths to solutions. 932 01:22:00,860 --> 01:22:03,600 I think we're doing that. I think the forums that you guys 933 01:22:03,600 --> 01:22:07,300 have created in the discussions that we're having now are going to generate some of that. Hopefully 934 01:22:07,300 --> 01:22:13,900 the plan can really capture that and codify to some extent. The issue of the target is super important 935 01:22:13,900 --> 01:22:17,380 and I don't want to say any more about that right now because I think it needs to play out, 936 01:22:17,380 --> 01:22:23,200 But I will say that, I think we all know that the current standard of the people they're building to is not sufficient. 937 01:22:23,780 --> 01:22:30,670 And so, that's not sufficient. We should be able to say more than that. 938 01:22:31,930 --> 01:22:38,130 And I know there's a lot of implications for being ready to make an estatement for the state or for the locals, 939 01:22:38,330 --> 01:22:44,370 but we need to figure out how to support each other so we can incrementally raise the bar and be really clear about it, 940 01:22:44,450 --> 01:22:46,770 so that people know what they're getting when they invest their money. 941 01:22:48,030 --> 01:22:53,830 And the last thing, I found myself borrowing something that Ryan said earlier, which is sort 942 01:22:53,830 --> 01:22:59,150 of the program scale, you know, trying to be a little more strategic about how this works. 943 01:22:59,290 --> 01:23:05,670 And I'm glad that our P-Fox came in, but I want to make sure that we also think about the ways 944 01:23:05,670 --> 01:23:08,530 that we can connect those three regions, right? 945 01:23:08,670 --> 01:23:15,550 So besides having these individual regional plans and the projects in them, I think the state 946 01:23:15,550 --> 01:23:21,030 could do a real service to make sure those things fit together, and then what there's gaps, 947 01:23:21,050 --> 01:23:23,170 proposed things that fill the gaps. 948 01:23:24,270 --> 01:23:27,770 And there are things that states leading now that we could do that, as an example, rather 949 01:23:27,770 --> 01:23:32,950 than just sort of help Sejfka, the Samokin River Estration Program is a big deal, and 950 01:23:32,950 --> 01:23:35,610 then takes a lot of state time and investment in energy. 951 01:23:36,530 --> 01:23:41,210 And I think they think about the flooding part of it, but I think we could be more explicit 952 01:23:41,210 --> 01:23:46,350 about that and really help think about how that area connects to the middle which connects to 953 01:23:46,350 --> 01:23:55,270 the bottom and start to just draw those things out so that we have not just a more specific plan, 954 01:23:55,630 --> 01:24:00,450 but also again try to help flag who the responsible parties are going forward. So we have a lot of 955 01:24:00,450 --> 01:24:05,910 time until the plan's going to be in front of us and and that is and so I'm really happy to see an 956 01:24:05,910 --> 01:24:09,590 early effort to structure bringing like to these things. So thank you guys for doing that. 957 01:24:14,910 --> 01:24:18,290 Thank you for the update. 958 01:24:18,750 --> 01:24:26,490 I thought the workshop that you put on was extremely beneficial and it showed, at least 959 01:24:26,490 --> 01:24:26,970 them. 960 01:24:27,570 --> 01:24:36,090 I'm just slow, but it emphasized the uncertainty which has always been there as far as 961 01:24:36,090 --> 01:24:42,750 these projections are and the one chart that got in my attention was that some of the modeling 962 01:24:42,750 --> 01:24:49,130 that showed the greatest increase in temperature, which we all agree is happening, also showed 963 01:24:49,130 --> 01:24:59,930 the least increase in precipitation. That's a lot of uncertainty. So, we need, so 964 01:25:00,000 --> 01:25:08,180 I have totally agree with your approach to show what the uncertainty is in this new way of going 965 01:25:08,180 --> 01:25:14,420 for rather than a single item saying this is what the future is. I think we should show the 966 01:25:14,420 --> 01:25:23,700 range of uncertainty. I also think we should show where we are today without the modeling uncertainty 967 01:25:23,700 --> 01:25:35,040 of climate change. Okay. And I feel it's a state responsibility to come up, we have a standard 968 01:25:35,700 --> 01:25:43,560 200-year. It's a state standard for urban areas. We should come forward and say today 969 01:25:43,560 --> 01:25:46,020 the 200-year flow is this. 970 01:25:48,560 --> 01:25:53,080 And so when we do the uncertainty range, we should show where 971 01:25:53,080 --> 01:25:59,280 best estimate of where we are today is within that range. You following what I'm saying? 972 01:25:59,760 --> 01:26:06,920 I think so. I mean, it may be. I mean, I've sort of had the assumption that today is like 973 01:26:06,920 --> 01:26:14,900 here and all of the climate change is over here. In other words, all show an increase. But I'm wondering 974 01:26:14,900 --> 01:26:21,880 now after the workshop that was presented, if we said today is here and it's within the range 975 01:26:21,880 --> 01:26:31,580 of the uncertainty of the climate change, that would be valuable information to know, so I would 976 01:26:31,580 --> 01:26:39,140 encourage that we try to establish what the 200-year flow is on the San Joaquin system today, 977 01:26:40,660 --> 01:26:46,680 and where it fits within the range of uncertainty with climate change in the future, self-discipline. 978 01:26:47,380 --> 01:26:53,660 But thank you. I felt the workshop was very effective and I appreciate how you go out 979 01:26:53,660 --> 01:26:59,620 to the public and gather information and comments and listen and actually try to respond. 980 01:27:00,040 --> 01:27:03,140 It's really great to see. Thank you. 981 01:27:03,780 --> 01:27:08,840 If I could add to what you said, another point that came out, your point about the 200 year 982 01:27:08,840 --> 01:27:14,500 as well is well taken. The same could be said. I think about the 100 year and the 50 and the 25 because 983 01:27:14,500 --> 01:27:19,400 Another thing that came out is that across the spectrum of flood events, we're expecting 984 01:27:19,940 --> 01:27:22,420 increases in significant uncertainty. 985 01:27:22,740 --> 01:27:25,120 So we do want to look at events of multiple sizes. 986 01:27:25,340 --> 01:27:26,500 I agree. 987 01:27:27,720 --> 01:27:36,040 One other thing that occurred to me, Mary, is I think one of the reasons we've been able 988 01:27:36,040 --> 01:27:44,200 to get as far as we have with the Yolo bypass is because we finally convinced Yolo County 989 01:27:44,200 --> 01:27:53,320 to present an implementation plan to us that we were able to react to and change and so on 990 01:27:53,320 --> 01:28:00,660 and we're now in the process of implementing that with local support and there changes to it 991 01:28:00,660 --> 01:28:06,920 and there are places where we're arguing the setback levee down near the deep water channel 992 01:28:06,920 --> 01:28:13,240 on a few other areas in the bypass, but it's the first time that we're kind of moving together 993 01:28:13,240 --> 01:28:21,380 in that, in the bypass with projects that have logo support and so on. 994 01:28:23,080 --> 01:28:28,220 The one thing we need, I think, from the 995 01:28:30,680 --> 01:28:32,520 lower sector, 996 01:28:32,560 --> 01:28:37,020 upper sector, I don't know, Levy District, is an implementation plan. 997 01:28:37,980 --> 01:28:43,440 Now, when we went down and talked to Reggie's boards of directors, 998 01:28:43,440 --> 01:28:56,900 We told them that we have this list of projects and so on from them, but we need a policy document from them as to what generally they would accept. 999 01:28:56,900 --> 01:29:05,900 What is their plan for flood risk reduction in that area? 1000 01:29:06,020 --> 01:29:17,320 An implementation plan kind of what Tom Inglor is doing for the Feather River area that the study 1001 01:29:17,320 --> 01:29:24,240 that they're moving forward on, which is an implementation plan taking the policy plan 1002 01:29:24,240 --> 01:29:30,860 of the River Coordor Plan and moving it toward a policy plan for that area in the north. 1003 01:29:31,280 --> 01:29:41,020 We need the same thing for Regis area and I talked to Rob Tol about that and he agrees 1004 01:29:41,020 --> 01:29:42,840 and wants to do that. 1005 01:29:43,560 --> 01:29:54,000 We have some extra money from the F map program if they're willing to maybe bring that forward 1006 01:29:54,000 --> 01:29:59,660 to us, I think we'd be willing to help share the cost of doing that if that's what they 1007 01:29:59,660 --> 01:29:59,980 would need. 1008 01:30:00,000 --> 01:30:03,860 But they're going to have to pay for some of it, because that's one of the requirements. 1009 01:30:04,420 --> 01:30:15,140 But it seems to me that that's one of the key elements of moving the locals to a point where we can get to an agreement on a plan. 1010 01:30:15,660 --> 01:30:21,040 And I think that would also be helpful for us going to the Bureau, 1011 01:30:21,040 --> 01:30:30,580 and saying the restoration of the San Joaquin is having impacts. 1012 01:30:31,300 --> 01:30:36,960 And here's the policy document that shows that. 1013 01:30:37,360 --> 01:30:45,720 And we think the Bureau ought to use some of the restoration money to help with the mitigation on the flood system. 1014 01:30:46,200 --> 01:30:48,680 But we can't do that without a policy plan. 1015 01:30:48,680 --> 01:30:55,900 In other words, we can't go to the Bureau on every little task that comes up that they're 1016 01:30:55,900 --> 01:30:59,180 doing trying to proceed with the Restoration Program. 1017 01:30:59,480 --> 01:31:05,640 We don't have a flood implementation program to say, hey, these are the impacts you're 1018 01:31:05,640 --> 01:31:08,540 having and we expect you to help pay for that. 1019 01:31:09,440 --> 01:31:10,520 We don't have it. 1020 01:31:11,480 --> 01:31:16,600 I thought we talked Jane and I talked to the board members about that. 1021 01:31:17,520 --> 01:31:25,600 We don't see that there's much progress on this matter of fact, Rob Tol's scope of work that he's doing now doesn't have that in it. 1022 01:31:27,240 --> 01:31:29,700 Because they don't want to pay for it. 1023 01:31:30,160 --> 01:31:32,060 But I think we could talk about that. 1024 01:31:32,080 --> 01:31:33,220 But we need that plan. 1025 01:31:33,540 --> 01:31:35,020 We need to know what they want down 1026 01:31:37,770 --> 01:31:38,390 there. 1027 01:31:38,770 --> 01:31:39,450 Anything else? 1028 01:31:43,310 --> 01:31:43,490 Okay. 1029 01:31:44,050 --> 01:31:44,550 Thank you, Larry. 1030 01:31:44,910 --> 01:31:45,410 Thank you. 1031 01:31:49,720 --> 01:31:50,920 Okay, we're on item. 1032 01:31:51,440 --> 01:31:51,760 Let's see. 1033 01:31:52,100 --> 01:31:53,080 You want to take a break? 1034 01:31:54,280 --> 01:31:54,360 Okay. 1035 01:31:55,220 --> 01:31:55,600 Okay. 1036 01:31:56,240 --> 01:32:00,100 What are we trying to get back in 10 or 15 minutes please? 1037 01:35:16,080 --> 01:35:23,380 And initial study and mitigated negative declaration. So here with me this morning, I have a carry 1038 01:35:23,380 --> 01:35:28,740 buckman to talk about the notice of preparation and Captain Markets to talk about the initial 1039 01:35:28,740 --> 01:35:34,460 study and mitigated negative declaration. For the Board's part, Board staff has submitted comment 1040 01:35:34,460 --> 01:35:42,020 letters on both of these applications. In regards to the notice of preparation, which was 1041 01:35:42,020 --> 01:35:58,500 Initially, she did in January 15th of this year, closes on March 20th, Board Express staff expressed concerns about clear identification about locations proposing about the proposed construction activities in the state plan of flood control. 1042 01:35:59,240 --> 01:36:07,220 Our concerns regarding the hall routes and construction zones, specifically as it pertains to potential levy reconstruction and emergency repairs. 1043 01:36:07,220 --> 01:36:13,120 and finally, flood effects to the state plant flood control from constructing the 1044 01:36:13,120 --> 01:36:17,020 Delta Command's project from a faraway application perspective. 1045 01:36:17,880 --> 01:36:24,040 On the soil investigation, for data collection, application, or excuse me, the initial 1046 01:36:24,040 --> 01:36:31,120 study, our board staff, 300 Andrea Buckley and her office, has indicated concerns about 1047 01:36:31,120 --> 01:36:36,860 the little detail necessary to make that determination regarding sufficient information 1048 01:36:36,860 --> 01:36:42,500 to support the environmental analysis for type of testing, depth of drilling, staging 1049 01:36:42,500 --> 01:36:46,740 locations, and those types of things regarding the geotechnical investigations. 1050 01:36:48,000 --> 01:36:55,420 And also the difference of impact studies, such as biological or cultural studies, and 1051 01:36:55,420 --> 01:37:00,020 their corresponding mitigation measures for those that would, again, support making a 1052 01:37:00,020 --> 01:37:03,120 determination of a mitigated negative declaration. 1053 01:37:03,120 --> 01:37:07,120 And with that, I'm going to turn it over to Kerry Buckman for that. 1054 01:37:07,120 --> 01:37:07,720 There and I. 1055 01:37:08,000 --> 01:37:08,420 But yeah, Glenn. 1056 01:37:08,740 --> 01:37:11,020 Forgive me. 1057 01:37:11,100 --> 01:37:12,660 It's really sounds stupid. 1058 01:37:13,740 --> 01:37:16,060 But is this the new water fix project? 1059 01:37:16,520 --> 01:37:18,400 Is this what we're doing here? 1060 01:37:18,820 --> 01:37:20,140 It goes by many names. 1061 01:37:20,460 --> 01:37:20,680 But yeah. 1062 01:37:21,520 --> 01:37:21,540 It's. 1063 01:37:22,400 --> 01:37:24,240 It is the single tunnel. 1064 01:37:24,640 --> 01:37:25,560 I did that. 1065 01:37:26,320 --> 01:37:29,580 Identifying any water resiliency portfolio as well. 1066 01:37:29,840 --> 01:37:30,200 Yes, sir. 1067 01:37:31,180 --> 01:37:34,860 What's that actually? That's carry. Thank you. 1068 01:37:35,460 --> 01:37:36,680 They should be here. 1069 01:37:36,860 --> 01:37:38,520 Good morning. Thank you for having me. 1070 01:37:39,620 --> 01:37:43,240 So my name is Carrie Buckman. I'm DWR's environmental program manager for 1071 01:37:43,240 --> 01:37:47,460 Delta Command. So it's my responsibility to work on all of the environmental planning and 1072 01:37:47,460 --> 01:37:51,080 permitting for the process and try to look at the different efforts and bring them together. 1073 01:37:51,340 --> 01:37:56,740 So we're not waiting until later to consider permit needs, but rather looking at it all in a more 1074 01:37:56,740 --> 01:37:57,900 comprehensive fashion. 1075 01:37:58,820 --> 01:38:03,080 Are you preparing to scope them for the project or what? 1076 01:38:03,780 --> 01:38:06,100 So we have a team working on that, but yes. 1077 01:38:08,440 --> 01:38:11,060 So today I'm going to go over the Delta Command's Project 1078 01:38:11,060 --> 01:38:12,160 Notice of Preparation. 1079 01:38:12,420 --> 01:38:14,380 I'll talk a little bit about the Delta Command's 1080 01:38:14,380 --> 01:38:17,220 Design and Construction Authority or DCA because we get a lot 1081 01:38:17,220 --> 01:38:19,980 of questions about the DCA and their role in the project. 1082 01:38:20,540 --> 01:38:22,800 Then I'll talk a little bit about the types of public engagement 1083 01:38:22,800 --> 01:38:24,140 that we're working on. 1084 01:38:25,880 --> 01:38:28,700 So a little bit of background to your question about whether 1085 01:38:28,700 --> 01:38:31,480 This is the same as water fix or the new water fix. 1086 01:38:32,040 --> 01:38:36,120 In July of 2017, DWR approved a two-tonal conveyance project, 1087 01:38:36,480 --> 01:38:37,400 California Water Fix. 1088 01:38:38,080 --> 01:38:40,680 Then in February of 2019, governor knew some announced 1089 01:38:40,680 --> 01:38:43,480 to support for a single tunnel conveyance project, 1090 01:38:43,840 --> 01:38:45,760 and then issued an executive order in April, 1091 01:38:46,120 --> 01:38:49,500 directing DWR to assess planning for that single tunnel project. 1092 01:38:50,220 --> 01:38:53,480 As a result, in May of 2019, DWR withdrew 1093 01:38:53,480 --> 01:38:55,180 all California Water Fix approval 1094 01:38:55,180 --> 01:38:57,160 and environmental compliance documentation. 1095 01:38:57,160 --> 01:39:01,580 at that point planning for California Water Fix ceased. 1096 01:39:02,520 --> 01:39:05,200 In January of 2020, the state released a draft 1097 01:39:05,200 --> 01:39:08,220 water resilience portfolio and DWR issued a notice 1098 01:39:08,220 --> 01:39:11,580 of preparation or an OP for a proposed single tunnel project. 1099 01:39:12,340 --> 01:39:13,920 So this is a new planning effort. 1100 01:39:14,460 --> 01:39:16,940 We are using information to the extent applicable 1101 01:39:16,940 --> 01:39:19,960 and appropriate from previous efforts is directed by the governor 1102 01:39:19,960 --> 01:39:23,260 but we are starting at the beginning of the planning process. 1103 01:39:26,420 --> 01:39:28,860 So these are some of the key milestones for the project. 1104 01:39:30,640 --> 01:39:35,200 We've started the SQL process now, and mostly I wanted to highlight that we're looking 1105 01:39:35,200 --> 01:39:41,000 at SQL now, we're looking at a draft EIR, around the end of this year, a final EIR 1106 01:39:41,000 --> 01:39:47,640 in early 2022, and a notice of determination shortly thereafter, concurrently we're starting 1107 01:39:47,640 --> 01:39:53,720 work on the Indangird Species Act and California Indangird Species Act compliance, and 1108 01:39:53,720 --> 01:39:57,840 water rates, Delta Plan and Consistency and other environmental permits, these lines show 1109 01:39:57,840 --> 01:40:00,000 periods of more intense activity later in the... 1110 01:40:00,000 --> 01:40:03,140 The process, but we are actually starting work on all of those now. 1111 01:40:06,750 --> 01:40:19,710 So the Delta conveyance environmental review. The purpose is to identify, analyze and disclose the potential significant adverse environmental impacts of a proposed project and provide feasible mitigation measures and alternatives to avoid or reduce such effects. 1112 01:40:20,470 --> 01:40:27,990 So we're starting now with the yellow highlighted box that is the NOP and we've started public scoping meetings on that process. 1113 01:40:27,990 --> 01:40:32,430 And that's a major opportunity for public involvement as highlighted in orange. 1114 01:40:33,070 --> 01:40:43,030 From after the public scoping, we will put together a scoping summary report that documents the contents that we heard during scoping, and that will help inform an agency outreach plan. 1115 01:40:43,690 --> 01:40:52,090 At that point, we'll move into the second step on this chart where we are formulating alternatives further defining the proposed project. 1116 01:40:52,090 --> 01:40:57,130 Developing technical reports to better characterize the technical aspects of the effort 1117 01:40:57,130 --> 01:41:02,130 and using that as the basis for an impact in mitigation analysis. That information will 1118 01:41:02,130 --> 01:41:07,870 be combined into the draft EIR and at that point those orange boxes indicate that's another 1119 01:41:07,870 --> 01:41:13,030 major part of the public involvement outreach. So we will have an opportunity for the public 1120 01:41:13,030 --> 01:41:17,550 to review the draft EIR and we will do a suite of public hearings at that point as well. 1121 01:41:17,930 --> 01:41:21,470 Based on those comments, we will respond to comments and address them as appropriate 1122 01:41:21,470 --> 01:41:26,470 in the Environmental Document, produce the final environmental impact report and develop a notice 1123 01:41:26,470 --> 01:41:32,030 of determination. And the orange boxes highlight major parts of public involvement, but I 1124 01:41:32,030 --> 01:41:36,970 did want to also highlight that you see the stakeholder engagement error sort of to the left 1125 01:41:36,970 --> 01:41:41,690 of the numbers, that we are planning to conduct stakeholder engagement in public outreach throughout 1126 01:41:41,690 --> 01:41:42,790 the entire process. 1127 01:41:46,550 --> 01:41:49,950 So the purpose of the notice appropriation is to document the intent to 1128 01:41:49,950 --> 01:41:52,490 developing EIR for the Delta Convance Project. 1129 01:41:53,230 --> 01:41:56,630 Trigger the start of scoping, describe the proposed projects, 1130 01:41:57,010 --> 01:41:58,850 including probable environmental effects, 1131 01:41:59,510 --> 01:42:01,110 and provide notice about scoping meetings 1132 01:42:01,110 --> 01:42:02,610 and how to make a scoping comment. 1133 01:42:03,330 --> 01:42:06,510 And I did want to highlight that the NOP is not a decision document. 1134 01:42:06,930 --> 01:42:09,270 SQL requires us to include a proposed project 1135 01:42:09,270 --> 01:42:12,310 so that people have something to comment on and react to, 1136 01:42:12,710 --> 01:42:14,330 but that does not indicate a decision. 1137 01:42:14,970 --> 01:42:16,570 We are at the very beginning of this process 1138 01:42:16,570 --> 01:42:18,530 and we won't make a decision until the end 1139 01:42:18,530 --> 01:42:19,770 with the notice of determination. 1140 01:42:23,500 --> 01:42:26,260 The project purpose and objectives reflect the fundamental reasons 1141 01:42:26,260 --> 01:42:28,520 that DWI are is considering this project. 1142 01:42:29,280 --> 01:42:31,200 So the purpose is to develop new diversion 1143 01:42:31,200 --> 01:42:32,920 and convey its facilities in the Delta 1144 01:42:32,920 --> 01:42:35,360 necessary to restore and protect the reliability 1145 01:42:35,360 --> 01:42:37,960 of water deliveries and a cost effective manner 1146 01:42:37,960 --> 01:42:40,600 consistent with the state's water resilience portfolio. 1147 01:42:41,380 --> 01:42:43,380 And the objectives are to address sea level rise 1148 01:42:43,380 --> 01:42:46,760 and climate change, minimize water supply disruption due 1149 01:42:46,760 --> 01:42:49,560 to seismic risk, protect water supply reliability, 1150 01:42:49,560 --> 01:42:51,660 and provide operational flexibility. 1151 01:42:55,470 --> 01:43:00,390 And the proposed project area reflects areas 1152 01:43:00,390 --> 01:43:03,330 that could have both direct and indirect impacts 1153 01:43:03,330 --> 01:43:06,270 with within the Delta, as well as the construction area. 1154 01:43:06,490 --> 01:43:08,950 So construction would occur within the statutory Delta, 1155 01:43:09,430 --> 01:43:10,830 but there could be indirect impacts 1156 01:43:10,830 --> 01:43:12,450 to rivers upstream from the Delta, 1157 01:43:12,870 --> 01:43:14,450 and there could be effects within the areas 1158 01:43:14,450 --> 01:43:16,150 that could receive water from the project, 1159 01:43:16,190 --> 01:43:18,970 shown in green for the state water project service areas, 1160 01:43:19,530 --> 01:43:21,830 and potentially also the Central Valley Project Service 1161 01:43:21,830 --> 01:43:23,130 area is shown in yellow. 1162 01:43:29,080 --> 01:43:33,800 So the proposed project facilities, this map, is a little bit small and some of the screens, 1163 01:43:33,880 --> 01:43:37,720 but I believe that you also have the copy of the notice of preparation in your packets, 1164 01:43:37,880 --> 01:43:39,720 and so this map is from the notice of preparation. 1165 01:43:40,700 --> 01:43:45,540 So the facilities include intake facilities on the Sacramento River, and the map shows three 1166 01:43:45,540 --> 01:43:49,100 potential sites, but we're looking to select two of those three. 1167 01:43:49,460 --> 01:43:54,420 Tunnel reaches and tunnel shafts for the water to be conveyed from those intakes to the 1168 01:43:54,420 --> 01:44:00,100 Delta. Four days, potentially an intermediate and a southern four-way to help manage hydraulics within the 1169 01:44:00,100 --> 01:44:05,760 tunnel. A pumping plant to pump water from the tunnel up into the southern four-way. And convey 1170 01:44:05,760 --> 01:44:10,360 its facilities to convey water from the southern four-way to the south Delta pumping facilities. 1171 01:44:13,980 --> 01:44:19,640 The NOP has two potential corridors for the tunnel. The yellow corridor is similar to the 1172 01:44:19,640 --> 01:44:25,720 old water fix alignment, and the purple corridor is further to the east to help us evaluate trade-offs 1173 01:44:25,720 --> 01:44:27,040 between those two locations. 1174 01:44:27,720 --> 01:44:30,000 At this point, we do not have a preference between the two, 1175 01:44:30,120 --> 01:44:32,060 and we would only be looking to select one. 1176 01:44:32,320 --> 01:44:33,940 We aren't looking to select both. 1177 01:44:38,260 --> 01:44:40,880 The NOP includes a capacity for the proposed project 1178 01:44:40,880 --> 01:44:44,040 of 6,000 cubic feet per second or CFS, 1179 01:44:44,280 --> 01:44:47,500 combined between two intakes of 3,000 CFS each 1180 01:44:47,500 --> 01:44:49,040 located on the Sacramento River. 1181 01:44:49,780 --> 01:44:51,980 And the NOP also identifies that we are looking 1182 01:44:51,980 --> 01:44:55,060 to select alternatives after we receive scope and comments, 1183 01:44:55,260 --> 01:44:57,060 but we will likely consider alternatives 1184 01:44:57,060 --> 01:44:59,940 that have the range of 3,000 CFS to 70. 1185 01:45:00,000 --> 01:45:01,940 1,500 CFS. 1186 01:45:05,450 --> 01:45:12,450 Operations of the facility. The new diversion facility would be operated together with the existing South Delta pumping facilities. 1187 01:45:12,810 --> 01:45:20,670 This would not replace the existing South Delta facilities. So operations would increase DWR's ability to capture water during high flow events. 1188 01:45:21,210 --> 01:45:32,290 The initial operating criteria will be formulated to assess impacts of mitigation, but we do want to highlight that after we do the sequence evaluation, some of the subsequent permits may impose additional restrictions that we would also 1189 01:45:32,290 --> 01:45:33,850 incorporate operations. 1190 01:45:37,900 --> 01:45:41,480 Within the EIR, DWR will select a reasonable range of potentially 1191 01:45:41,480 --> 01:45:45,700 feasible alternatives that meet the project objectives and have the potential to reduce 1192 01:45:45,700 --> 01:45:51,320 impacts. And the Scoping Period provides an opportunity for the public to comment on alternatives. 1193 01:45:52,180 --> 01:45:56,860 After Scoping, we will take the information and feedback that we've received, formulate alternatives 1194 01:45:56,860 --> 01:46:02,500 and publicize those alternatives that we intend to include for detailed evaluation in the draft EIR. 1195 01:46:04,630 --> 01:46:10,610 We are currently in the public scoping period, so we've conducted seven scoping meeting so far. 1196 01:46:10,870 --> 01:46:15,870 We have our last scoping meeting next Monday, the second in redding, and comments are 1197 01:46:15,870 --> 01:46:16,770 due on March 20. 1198 01:46:19,360 --> 01:46:24,060 Before I leave this, I did just want to highlight that any sloping comments, if anyone wants 1199 01:46:24,060 --> 01:46:26,860 to make comments coming so that they're made to date to the board, would not be considered 1200 01:46:26,860 --> 01:46:30,380 as part of our scoping process, so if anyone wants to make comments, it would really encourage 1201 01:46:30,380 --> 01:46:34,740 them to submit them to us directly, and I do appreciate that the board has submitted comments. 1202 01:46:34,740 --> 01:46:36,020 Thank you. 1203 01:46:40,220 --> 01:46:40,520 Go ahead. 1204 01:46:40,980 --> 01:46:41,520 Go ahead. 1205 01:46:42,640 --> 01:46:42,780 Okay. 1206 01:46:44,100 --> 01:46:47,740 So moving on to talk a little bit about the Delta Convention's design and construction authority 1207 01:46:47,740 --> 01:46:48,820 or the DCA. 1208 01:46:49,300 --> 01:46:53,720 It was established as a joint powers authority between the participating public water agencies 1209 01:46:53,720 --> 01:46:55,080 or PWAs. 1210 01:46:55,720 --> 01:47:00,940 The Board of Directors is composed of elected officials from the PWAs and it was originally established 1211 01:47:00,940 --> 01:47:04,020 to have up to seven members and currently has four. 1212 01:47:04,720 --> 01:47:18,900 It was originally established to complete design and construction for the California Waterfix and so the purpose of that organization has had to shift as part of this effort to focus more on design during the planning phase. 1213 01:47:20,120 --> 01:47:31,040 So the DCA and DWR have a joint exercise of powers agreement that was changed to provide design support for environmental planning, so DWR is directing the work and providing oversight. 1214 01:47:31,040 --> 01:47:38,520 And DWR has asked the DCA to develop preliminary designs for the proposed project and alternatives 1215 01:47:38,520 --> 01:47:43,020 when developed to avoid or minimize construction effects to the local communities. 1216 01:47:46,460 --> 01:47:52,120 DWR's role between the DWR and DCA collaboration is that the DWR leads the environmental 1217 01:47:52,120 --> 01:47:55,460 review and planning effort, including SQL and other environmental permits. 1218 01:47:56,240 --> 01:48:00,400 We leave public outreach, public participation, and stakeholder engagement activities. 1219 01:48:00,400 --> 01:48:05,900 We ensure transparency and we're responsible for managing the planning budget and planning schedule. 1220 01:48:06,580 --> 01:48:09,220 Finally, we direct and oversee the work of the DCA. 1221 01:48:12,170 --> 01:48:17,050 Under oversight of DWI, the DCA will conduct engineering and design work to inform the 1222 01:48:17,050 --> 01:48:18,870 environmental review and planning process. 1223 01:48:19,550 --> 01:48:24,790 Identify potential engineering and design strategies to avoid or minimize effects and 1224 01:48:24,790 --> 01:48:29,170 Assistant conducting public outreach, public participation and stakeholder engagement activities. 1225 01:48:31,700 --> 01:48:36,140 Also, the public water agencies that would receive water have a role in this effort, so they 1226 01:48:36,140 --> 01:48:39,960 are providing technical expertise to DWR and the DCI. 1227 01:48:40,160 --> 01:48:45,080 They're collaborating on public participation in public outreach and working to help make 1228 01:48:45,080 --> 01:48:49,680 sure that the planning and project development meet the financial policy, technical, and 1229 01:48:49,680 --> 01:48:53,380 long-term planning needs of their retailers member agencies and ratepayers. 1230 01:48:57,590 --> 01:49:00,770 So the last thing I wanted to talk about was a little bit about what we're doing for public 1231 01:49:00,770 --> 01:49:01,190 engagement. 1232 01:49:01,190 --> 01:49:06,070 So right now we are working on scoping meetings, as I mentioned we've had seven so far. 1233 01:49:06,530 --> 01:49:11,770 We will also have public hearings after the draft is released to have a formal public comment period. 1234 01:49:12,470 --> 01:49:19,890 We're planning to have technical workshops where we are able to present technical information that may be of benefit to people who are interested in the project. 1235 01:49:20,550 --> 01:49:23,110 We are working to have disadvantaged community outreach. 1236 01:49:23,190 --> 01:49:29,150 We understand that for disadvantaged communities it may not be possible or maybe very difficult to come to our scoping meetings. 1237 01:49:29,150 --> 01:49:33,310 and so we're working now to make sure that disadvantaged communities know that scoping is 1238 01:49:33,310 --> 01:49:33,770 underway. 1239 01:49:34,450 --> 01:49:37,510 They know how to submit comments and we help them in any way we can. 1240 01:49:37,950 --> 01:49:42,010 We've also offered to attend meetings in their communities, maybe existing meetings 1241 01:49:42,010 --> 01:49:45,670 that people are already going to to try to make this as easy as possible for them to learn 1242 01:49:45,670 --> 01:49:49,030 about the project and understand ways to submit comments. 1243 01:49:50,310 --> 01:49:54,310 We have the DCA stakeholder engagement committee, which I'll talk about in the next slides. 1244 01:49:54,310 --> 01:49:59,990 And the California Water Commission is that we're planning to report regularly to the country. 1245 01:50:00,000 --> 01:50:04,300 California Water Commission is a way to continue to make public information about the effort. 1246 01:50:07,740 --> 01:50:10,460 So a little bit more about the DCA's stakeholder engagement committee. 1247 01:50:11,000 --> 01:50:16,560 The stakeholder engagement committee has been formed to help identify ways to design and construct the project 1248 01:50:16,560 --> 01:50:20,680 that would avoid or minimize effects to local communities and the Delta as a place. 1249 01:50:21,260 --> 01:50:26,720 It has 17 members representing different key stakeholder groups in the Delta, and it has up to five 1250 01:50:27,280 --> 01:50:33,800 at the moment, I think there are two positions that have been filled, and members do not need to agree with the project. 1251 01:50:34,620 --> 01:50:40,080 I also wanted to highlight that when the members applied to be on the committee, one of the things that was on the application was, 1252 01:50:40,160 --> 01:50:45,920 Crystal, would stakeholder group to represent, but also how would you take this information back to your group, 1253 01:50:45,960 --> 01:50:52,300 how would this information be shared and go beyond just the committee, and so that's part of being on the committee's 1254 01:50:52,300 --> 01:50:55,840 agreement to share and collect information and feedback from their groups. 1255 01:50:58,610 --> 01:51:02,870 So the committee role as a committee of the DCA board, the topics are limited to work 1256 01:51:02,870 --> 01:51:08,410 completed by the DCA. So it's focused on design and construction-related activities. It 1257 01:51:08,410 --> 01:51:13,070 is scheduled to meet once or twice a month. It had five meetings so far and two more meetings 1258 01:51:13,070 --> 01:51:18,130 are scheduled for March and it is a brown-act body so it's subject to all brown-act requirements. 1259 01:51:18,850 --> 01:51:23,810 And it does not take the place of public involvement under sequa, DWR is still planning an extensive 1260 01:51:23,810 --> 01:51:26,150 the public involvement effort under CEQA. 1261 01:51:29,660 --> 01:51:33,020 So for next steps, several components of the project 1262 01:51:33,020 --> 01:51:36,720 would require review pursuant to Title 33 code section 1263 01:51:36,720 --> 01:51:40,100 for our late, specifically the intakes on the Sacramento River 1264 01:51:40,100 --> 01:51:42,880 would involve the board as a non-federal sponsor. 1265 01:51:43,640 --> 01:51:46,120 And so we're going to request approval of a no-objection 1266 01:51:46,120 --> 01:51:48,400 letter in March, so that will be something else 1267 01:51:48,400 --> 01:51:51,040 that you guys are seeing soon from us. 1268 01:51:53,680 --> 01:51:55,840 And I wanted to highlight ways to stay informed. 1269 01:51:56,000 --> 01:51:57,580 The best way to stay informed on Delta 1270 01:51:57,580 --> 01:52:01,280 that we have an email blast, and that comes out on a regular basis. 1271 01:52:01,800 --> 01:52:04,600 You can sign up for the email list on our Delta conveyance website. 1272 01:52:04,860 --> 01:52:06,940 There's a button and it's pretty easy to register. 1273 01:52:07,640 --> 01:52:10,520 Additionally, we have a website, a project hotline, 1274 01:52:10,540 --> 01:52:13,120 DWRS Twitter account, and our project email. 1275 01:52:23,640 --> 01:52:24,120 Okay. 1276 01:52:26,840 --> 01:52:29,080 Who appoints this engagement committee? 1277 01:52:29,920 --> 01:52:31,920 So it is a committee of the DCA board. 1278 01:52:31,920 --> 01:52:42,240 So the DCA board members appointed committee, the committee members, the committee members applied to be on the board, and then the board members reviewed and selected those members. 1279 01:52:45,700 --> 01:52:46,340 Clyde. 1280 01:52:46,440 --> 01:52:48,080 Yeah, just two questions, Kerry. 1281 01:52:49,100 --> 01:52:55,860 First, would the, would this connect with the Clifton Court, or does it connect to the, to the Tracy pumps? 1282 01:52:56,380 --> 01:52:59,140 So the proposed project does not connect to Clifton Court. 1283 01:52:59,140 --> 01:53:04,140 it has a separate southern forbe, and then it would have a direct connection to banks and or 1284 01:53:04,140 --> 01:53:04,820 Jones. 1285 01:53:07,160 --> 01:53:10,240 Oh, but the idea would be to put the water into the state water project. 1286 01:53:10,860 --> 01:53:14,500 So right now, reclamation has not identified if they want to be involved. 1287 01:53:14,800 --> 01:53:18,800 So the proposed project definitely includes a connection to the state water project facilities 1288 01:53:18,800 --> 01:53:22,440 and identifies the potential that there could be a connection to the Central Valley project 1289 01:53:22,440 --> 01:53:22,920 facilities. 1290 01:53:23,380 --> 01:53:23,640 Okay. 1291 01:53:23,820 --> 01:53:24,540 Second question. 1292 01:53:24,540 --> 01:53:32,520 What are the advantages and disadvantages of the two alignments that you have? 1293 01:53:32,660 --> 01:53:38,300 I mean, obviously a straight alignment kind of obvious sense in a kind of without knowing a lot. 1294 01:53:39,060 --> 01:53:43,340 But why the second one and what are the pros and cons of each it as you identify them now? 1295 01:53:43,640 --> 01:53:45,880 So I think it's too early for us to really know them all. 1296 01:53:46,080 --> 01:53:48,620 That's part of the reason we want to study them in the environmental document. 1297 01:53:48,740 --> 01:53:53,780 But the reason we started considering it is that we started to really understand that the 1298 01:53:53,780 --> 01:53:59,540 driver for construction-related effects is accessing the major points of construction, which for 1299 01:53:59,540 --> 01:54:04,960 this type of project include the intakes, the tunnel shafts or drive shafts, where the tunnels 1300 01:54:04,960 --> 01:54:09,220 are launched as well as maintenance and retrieval shafts, which are much smaller, and then 1301 01:54:09,220 --> 01:54:09,920 the four base. 1302 01:54:10,360 --> 01:54:14,580 And so because the shafts, particularly would be in the central delta, that's a little more 1303 01:54:14,580 --> 01:54:19,060 difficult to access from i5, for example, and also area railroads. 1304 01:54:19,060 --> 01:54:28,920 So we wanted to look at an option of moving it a little closer to I5 to see if that could reduce the effects associated with needing to get facilities to inform construction sites. 1305 01:54:29,420 --> 01:54:36,820 However, we haven't investigated the environmental effects yet of those areas as much, so we're not sure what we'll find yet that's part of what we're looking for in scoping. 1306 01:54:37,460 --> 01:54:45,640 And we know there's concerns about from Stockton residents that it's moving in a bit closer to Stockton and that could produce additional effects there that we haven't fully assessed yet. 1307 01:54:46,260 --> 01:54:46,920 Thank you. 1308 01:54:48,880 --> 01:54:57,880 Okay, any other questions for Carrie now this is going to be before us again in March 1309 01:55:01,720 --> 01:55:06,000 Okay, just for the four o'clock. 1310 01:55:08,900 --> 01:55:14,580 Okay, I guess I'll turn this back to Darren, or are we going to have? 1311 01:55:17,220 --> 01:55:20,060 Thank you, President. We also have Captain Marquez here to talk about. 1312 01:55:20,640 --> 01:55:25,540 Now, the other fades are a different part of the project, dealing with soils investigations in the Delta. 1313 01:55:28,200 --> 01:55:33,460 Oh, the one thing I forgot to ask, Kerry, Darren, is there going to be an EIS on this project? 1314 01:55:35,030 --> 01:55:42,250 So, there will need to be need book compliance because the court will definitely be involved in permitting the effort. 1315 01:55:42,990 --> 01:55:46,150 Reclamation may or may not choose to be involved as well. 1316 01:55:46,330 --> 01:55:49,630 There is still discussion on going about the need of phase. 1317 01:55:50,250 --> 01:55:54,930 However, when that initiates there will be a notice of intent and additional scoping on that side. 1318 01:55:55,390 --> 01:55:57,910 Okay, so there will be two separate documents as well. 1319 01:55:58,610 --> 01:56:03,950 That's not clear yet. I think that we would like ideally to try to have a combined document later in the process, 1320 01:56:03,950 --> 01:56:05,810 but we don't know yet how that will work. 1321 01:56:06,190 --> 01:56:06,730 OK, thanks, Gary. 1322 01:56:10,470 --> 01:56:11,710 Hi, I'm Katherine Marquez. 1323 01:56:11,830 --> 01:56:13,050 Thanks for having me here. 1324 01:56:13,510 --> 01:56:14,850 So I'm going to be talking to you guys 1325 01:56:14,850 --> 01:56:17,550 about the soil investigations for data collection in the Delta. 1326 01:56:18,810 --> 01:56:21,290 This is an effort for which DWR prepared 1327 01:56:21,290 --> 01:56:23,990 in initial study and proposed mitigated negative declaration. 1328 01:56:25,110 --> 01:56:27,710 The project objective for this specific project 1329 01:56:27,710 --> 01:56:29,690 is to determine the composition location 1330 01:56:29,690 --> 01:56:32,850 and geotechnical properties of soil materials 1331 01:56:32,850 --> 01:56:35,870 found in the Delta, which would then inform the design, 1332 01:56:35,870 --> 01:56:40,910 environmental analysis and development of alternatives for a potential delta commands project 1333 01:56:40,910 --> 01:56:45,330 and contribute to DWR as overall understanding of delta geology. 1334 01:56:46,850 --> 01:56:51,190 The project location, which you'll see in a second, is pretty broad. It's within the legal 1335 01:56:51,190 --> 01:56:57,090 delta in Alameda, Contrapasta, Sacramento, Solano, San Joaquin, and Yolo Counties. 1336 01:56:57,990 --> 01:57:04,630 And I have on there which is pretty small to see, but the website which carry also referenced 1337 01:57:04,630 --> 01:57:09,790 in her presentation and much larger, but specifically the environmental planning section of that 1338 01:57:09,790 --> 01:57:14,910 website, which has all of the information associated with the ISM&D. 1339 01:57:17,820 --> 01:57:19,740 So for the ISM&D, we went out 1340 01:57:19,740 --> 01:57:27,220 for public comment on November 20th through January 15th. Right now we are in the process of considering 1341 01:57:27,220 --> 01:57:33,280 all the comments that we received, including the boards comment letter. And we are reviewing those 1342 01:57:33,280 --> 01:57:38,200 comments alongside with the proposed mitigated negative declaration prior to making a determination 1343 01:57:38,200 --> 01:57:44,160 on whether to adopt a final mitigated negative declaration and making a decision on the proposed project. 1344 01:57:45,840 --> 01:57:51,060 If the project is approved, decision documents and a notice of determination would be filed per 1345 01:57:52,760 --> 01:57:58,820 and also it would be posted on our web page and an email notification will be sent out. 1346 01:57:58,940 --> 01:58:04,000 Again, this is if you're signed up on that e-blast that Kerry had mentioned before. 1347 01:58:06,820 --> 01:58:09,900 So, for the proposed project, I know this map is really hard to see. 1348 01:58:10,380 --> 01:58:17,040 And what I was just trying to show you here is a general overview of the overall proposed project for the ISM&D. 1349 01:58:17,040 --> 01:58:20,620 I will have maps later on my presentation that are much more zoomed in. 1350 01:58:20,720 --> 01:58:24,700 There is a map associated with the ISM and D itself that can be found on our web page. 1351 01:58:25,140 --> 01:58:30,580 This is a screenshot of the actual cams e-files, so the Google Earth files that we made available 1352 01:58:30,580 --> 01:58:33,740 to the public during the public comment period. 1353 01:58:34,360 --> 01:58:41,500 So we posted and noticed, we posted on our website that we would provide the GIS data 1354 01:58:41,500 --> 01:58:44,300 or Google Earth files to anyone who requested. 1355 01:58:44,720 --> 01:58:46,640 We did get some of our requests for that. 1356 01:58:48,380 --> 01:58:52,260 So just to orient you here, the overall proposed 1357 01:58:52,260 --> 01:58:56,140 project included 103 comb and penetration tests. 1358 01:58:56,280 --> 01:58:57,700 So these are CTTs. 1359 01:58:57,780 --> 01:59:00,120 They're about to 200 feet deep, and I'll explain 1360 01:59:00,120 --> 01:59:03,440 in each of these steps, so no little more detail later. 1361 01:59:04,420 --> 01:59:09,940 Just to explain on the map, the CTTs are the green circles 1362 01:59:09,940 --> 01:59:15,220 with green triangles in the middle. The soil boring, so we're proposed to where there are 1363 01:59:15,220 --> 01:59:22,900 approximately 100 and there were 167 on land soil borings for post. Those icons are the sort 1364 01:59:22,900 --> 01:59:31,680 of checker board circles. About 22 of those were up to 50 feet deep and 145 were up to 200 feet 1365 01:59:31,680 --> 01:59:39,140 deep. They were also over water borings that were proposed. Those are the blue squares on the map 1366 01:59:39,140 --> 01:59:42,120 And those are up to 200 feet below my line. 1367 01:59:42,720 --> 01:59:45,080 We also proposed to do some geophysical testing 1368 01:59:45,080 --> 01:59:48,320 arrays on bold and island, which you can't actually 1369 01:59:48,320 --> 01:59:52,540 see here, because icons are really big in this view. 1370 01:59:53,020 --> 01:59:56,080 But the nice part about Google Earth 1371 01:59:56,080 --> 01:59:59,320 is that you can really easily zoom in on the aerial imagery. 1372 02:00:00,000 --> 02:00:02,800 I mean, single one of these individual sites. 1373 02:00:04,900 --> 02:00:07,880 I think there's laser pointer. Okay, this laser pointer doesn't work. 1374 02:00:08,600 --> 02:00:12,920 All right, so the overall project description. 1375 02:00:13,260 --> 02:00:20,660 So I'm going to walk through the project description as opposed in the ISM and D, but sort of from the, 1376 02:00:20,760 --> 02:00:23,220 now we have all our permits, these are the steps we would take. 1377 02:00:24,440 --> 02:00:28,920 So the first thing, of course, is to get all the permits that we need to do the work, 1378 02:00:28,920 --> 02:00:41,020 get all the property access permissions to access the sites during that process of working with the land management agencies for encryption permits or the land out the private land owners themselves for temporary entry permits 1379 02:00:41,020 --> 02:00:48,980 We would then confirm the appropriate access routes and the final locations of the soil investigation sites based upon their input 1380 02:00:50,500 --> 02:00:56,660 Once we have all of that in hand, then the field of work commences, so this would start with 1381 02:00:56,660 --> 02:01:03,940 a site clearance, and DWR is standard practice for this kind of effort would be to 1382 02:01:04,600 --> 02:01:09,360 sound like a lot of people, but to go out there together and sort of look at the different 1383 02:01:09,360 --> 02:01:13,580 resource areas and perspectives at the same time so that a consensus can be made in the field. 1384 02:01:13,580 --> 02:01:22,520 So this includes a biologist and archaeologist and depending on tribal consultation, it could be a tribal representative. 1385 02:01:23,540 --> 02:01:26,520 The geologist of real estate representative and the drilling contractor. 1386 02:01:27,420 --> 02:01:31,060 And the purpose for this is that they're all going to be looking for different things. 1387 02:01:31,800 --> 02:01:35,840 So the drilling contractor might be looking for access and safety issues, 1388 02:01:36,480 --> 02:01:38,860 whereas the biologist is going to be doing wildlife surveys. 1389 02:01:40,180 --> 02:01:48,080 So, if, for example, a drilling contractor needs to move aside 50 feet east because of some 1390 02:01:48,080 --> 02:01:53,020 access issue, the wildlife person or the biologists can now make sure that they're buffer 1391 02:01:53,020 --> 02:01:55,760 area that they're surveying for wildlife also includes that area. 1392 02:01:57,880 --> 02:02:03,140 At this point in time, they would identify also any vegetation that might need to be disturbed 1393 02:02:03,140 --> 02:02:04,520 for this for access. 1394 02:02:04,520 --> 02:02:10,620 This is really just minor vegetation, potentially mowing, or termina bushes, maybe a branch, 1395 02:02:11,140 --> 02:02:14,020 but this wouldn't be done until we had approval from the landowner. 1396 02:02:14,880 --> 02:02:19,980 And of course, surveys and everything to make sure that that vegetation is insensitive, 1397 02:02:20,140 --> 02:02:25,060 or there's no wildlife associated with that vegetation that we would have concerns for. 1398 02:02:26,640 --> 02:02:33,040 So after the site clearance, the location would be marked in the field with a stake. 1399 02:02:33,040 --> 02:02:39,740 It would also be marked with a GPS unit when they come back and do the work later on prior to the 1400 02:02:39,740 --> 02:02:44,300 Drowberg entry in the site, the environmental monitor would then survey the site again, confirm anything 1401 02:02:44,300 --> 02:02:51,260 that any resources that were identified during the original site clearance and then make sure that no new 1402 02:02:51,260 --> 02:02:58,700 wildlife has entered the site. Just for explanation, the ISM&D included maximum numbers of equipment 1403 02:02:58,700 --> 02:03:06,240 and people on site, but the average born in our CPT site is really going to consist of mainly 1404 02:03:06,240 --> 02:03:12,840 the drill rig and CPT or CPT rig, which is managed typically by two or three people from the 1405 02:03:12,840 --> 02:03:19,180 drilling contractor, AGologists or two, and an environmental monitor. So, handful of people and 1406 02:03:20,360 --> 02:03:22,040 a few vehicles in the drill rig. 1407 02:03:24,400 --> 02:03:27,520 So, going into more explanation on the individual types of 1408 02:03:27,520 --> 02:03:34,140 investigations, CPTs, these comb penetration tests consists of a one-to-two inch rod that gets 1409 02:03:34,140 --> 02:03:39,540 pushed into the ground and it has gauges and sensors that continuously collect data throughout 1410 02:03:39,540 --> 02:03:47,120 that process once they get to the desired depth that hold and gets grounded and that's the 1411 02:03:47,120 --> 02:03:56,100 end of the CPT. For soil boreings, they can range in diameter from 48 inches if they're using a 1412 02:03:56,100 --> 02:04:03,300 It's 60 inches if they're not using a casing. It's four to six inches. For on land, we're typically not using a casing. 1413 02:04:05,300 --> 02:04:12,860 And we use mud rotary drilling, so that has drilling fluids, which are typically drilling polymers and or a bit in my clay. 1414 02:04:13,620 --> 02:04:19,300 This is all connected in hoses to recirculation tanks. It's a contained system. 1415 02:04:19,300 --> 02:04:23,460 And the drill cuttings themselves, if they're drilling, 1416 02:04:23,680 --> 02:04:26,360 get collected in those recirculation tanks as well. 1417 02:04:27,000 --> 02:04:28,660 And when the drilling is done, 1418 02:04:28,940 --> 02:04:30,700 that material all gets put into drums 1419 02:04:30,700 --> 02:04:31,860 and is supposed to be the landfill. 1420 02:04:34,380 --> 02:04:36,480 Again, once the holes are done, 1421 02:04:36,720 --> 02:04:38,160 they've gotten all the data they needed. 1422 02:04:38,480 --> 02:04:40,480 It gets grounded and sealed that way. 1423 02:04:41,140 --> 02:04:43,400 For overwater borings, it's the same process 1424 02:04:43,400 --> 02:04:46,200 with the exception of the use of a casing. 1425 02:04:47,140 --> 02:04:49,360 A casing, if you just visualize it, 1426 02:04:49,360 --> 02:04:55,220 really just like a giant straw that they push into the sediment, the soft sediments, and then 1427 02:04:55,220 --> 02:04:59,700 all the drilling occurs within that casing. So everything that happens is all contained. 1428 02:05:00,050 --> 02:05:03,310 And the same process occurs. 1429 02:05:05,570 --> 02:05:08,950 The geophysical surveys, I'm not going to go into a lot of detail about those. 1430 02:05:10,610 --> 02:05:24,470 The purpose of the geophysical surveys is to test a handful of different non-invasive techniques that would identify subsurface conditions without any drilling or excavation. 1431 02:05:24,470 --> 02:05:27,970 And this could be buried casings or abandoned wells. 1432 02:05:28,750 --> 02:05:37,970 They do this with electromagnetic meters and by a small machinery that causes vibrations 1433 02:05:37,970 --> 02:05:38,690 and sensors. 1434 02:05:39,550 --> 02:05:42,010 This is usually handheld equipment. 1435 02:05:43,790 --> 02:05:46,470 Things that may be decisable long-goer, that kind of thing. 1436 02:05:49,780 --> 02:05:53,640 So for permits, we've already applied for several permits here. 1437 02:05:53,640 --> 02:05:57,360 We submitted applications under Fish and Game Code 1600, 1438 02:05:57,720 --> 02:05:59,100 sourced streambed alteration agreement, 1439 02:06:00,340 --> 02:06:02,540 submitted applications for coverage under the Clean Water Act 1440 02:06:02,540 --> 02:06:05,300 Section 401 and Section 404, 1441 02:06:05,620 --> 02:06:07,140 along with our 404 application, 1442 02:06:07,400 --> 02:06:09,920 we submitted a biological assessment for Section 7 1443 02:06:09,920 --> 02:06:12,660 consultation under the Endangered Species Act, 1444 02:06:13,320 --> 02:06:16,440 and cultural resources inventory for Section 1445 02:06:16,440 --> 02:06:19,980 coverage under Section 106 of the National Historic Preservation Act, 1446 02:06:20,460 --> 02:06:22,840 and we are currently in the process of developing 1447 02:06:22,840 --> 02:06:27,740 our encroachment permit application package for the centrality flood protection board. 1448 02:06:30,420 --> 02:06:39,420 So, if the M&D is approved, the plan is to start the soil investigation field of work in the summer of this year, 1449 02:06:39,760 --> 02:06:45,080 but the sites that are under the floodboards jurisdiction wouldn't be planned until next year. 1450 02:06:45,620 --> 02:06:47,360 So, they'll lag by about a year. 1451 02:06:47,360 --> 02:06:50,840 And, like I said, we're preparing that 1452 02:06:50,840 --> 02:06:54,140 at Coachment Permit Application Package now with the DCA 1453 02:06:54,140 --> 02:06:56,720 and it'll include a drilling program plan. 1454 02:06:58,380 --> 02:07:00,660 And we have identified preliminary, 1455 02:07:00,940 --> 02:07:04,040 which sites we believe fall under the board's jurisdiction, 1456 02:07:04,220 --> 02:07:06,140 but we'd like to verify that with staff. 1457 02:07:07,080 --> 02:07:09,960 Sometimes it's a little difficult to change this in different areas, 1458 02:07:10,520 --> 02:07:12,300 as far as the buffers from the levees. 1459 02:07:12,980 --> 02:07:14,780 So we would like to verify that with staff, 1460 02:07:14,780 --> 02:07:18,260 but I do have slides showing what those areas are. 1461 02:07:18,660 --> 02:07:21,080 The next steps would then be after following this briefing, 1462 02:07:21,740 --> 02:07:23,640 it would be to set up a pre-application meeting. 1463 02:07:26,790 --> 02:07:29,790 So, again, sorry for the difficulty to see the slide, 1464 02:07:30,150 --> 02:07:33,250 but right here what I'm showing you are three CPTs. 1465 02:07:33,410 --> 02:07:35,610 They're about, they're up to 200 feet deep. 1466 02:07:35,910 --> 02:07:38,150 Those are, again, the circles with the green triangles. 1467 02:07:38,310 --> 02:07:40,430 You'll see them on the deep water ship channel. 1468 02:07:40,630 --> 02:07:43,810 If you orient yourself, highway five is, 1469 02:07:43,830 --> 02:07:45,170 I don't know which view you're looking off, 1470 02:07:45,170 --> 02:07:47,450 but up in that right hand corner 1471 02:07:47,450 --> 02:07:48,870 and the deep watershed channel, 1472 02:07:48,870 --> 02:07:51,670 sort of running down the middle to the left. 1473 02:07:53,410 --> 02:07:56,210 So there you'll see three along that area. 1474 02:07:59,840 --> 02:08:01,620 For on land-borns, again, sorry. 1475 02:08:02,360 --> 02:08:05,100 CPTs, they're always on land, so these would be in the living, 1476 02:08:05,280 --> 02:08:06,260 not in the channel themselves. 1477 02:08:08,220 --> 02:08:12,160 For on-land-borns, this map is a zoomed in area 1478 02:08:12,160 --> 02:08:13,800 of where most of them are gonna occur. 1479 02:08:13,960 --> 02:08:16,040 They're a total of 25 that we think might be 1480 02:08:16,040 --> 02:08:21,100 within your jurisdiction, this map shows 23 of them, 1481 02:08:21,300 --> 02:08:23,380 and they run along the Sacramento River 1482 02:08:23,380 --> 02:08:28,180 along Highway 160, sort of a little lower down on the map 1483 02:08:28,180 --> 02:08:29,800 towards the middle that's Hood Franklin Road 1484 02:08:29,800 --> 02:08:31,360 just to orient you. 1485 02:08:32,660 --> 02:08:36,620 All of these are up to 175 feet deep, 1486 02:08:37,000 --> 02:08:40,260 except for one, and I wish I could point to it 1487 02:08:40,260 --> 02:08:43,080 but it's sort of a middle of that bottom cluster. 1488 02:08:46,880 --> 02:08:50,140 be remaining two that weren't on that other map for on-line 1489 02:08:50,140 --> 02:08:55,360 boorings. One is along the levee on the ship channel, which you'll see sort of 1490 02:08:55,360 --> 02:09:02,000 toward the bottom left-hand corner here. And on that bottom tip of Grand 1491 02:09:02,000 --> 02:09:06,880 Island Highway 12 is running through the middle of this map just to orient you. 1492 02:09:09,560 --> 02:09:09,740 For 1493 02:09:09,740 --> 02:09:15,300 overwater boorings, this is where the majority of the overwater boorings are occurring 1494 02:09:15,300 --> 02:09:18,780 Again, over to the right, you'll see highway 160 1495 02:09:18,780 --> 02:09:19,960 in the Sacramento River. 1496 02:09:21,060 --> 02:09:24,700 There are about 10 over water borings along that line. 1497 02:09:25,420 --> 02:09:27,340 There is an over water boring. 1498 02:09:27,600 --> 02:09:30,140 If you're moving to the left a little bit, 1499 02:09:30,440 --> 02:09:31,720 somewhere in the middle of that image, 1500 02:09:31,900 --> 02:09:33,360 there's one on elk's slew. 1501 02:09:33,940 --> 02:09:37,400 And there's one on set or slew lower down from that. 1502 02:09:37,660 --> 02:09:40,220 And then you'll see three along the deep water ship channel. 1503 02:09:43,030 --> 02:09:45,470 The additional ones that weren't on that map 1504 02:09:45,470 --> 02:09:52,070 where there's two more on the deep watershed channel, and then you'll see if you hear a 1505 02:09:52,070 --> 02:09:58,090 two more lower down on the deep watershed channel. One, I would call that, I guess, cash 1506 02:09:58,090 --> 02:09:59,970 flew towards the end tip of gray. 1507 02:10:00,000 --> 02:10:11,940 And I'll end two on steamboat slew if you follow that up and through the middle and then one on the Sacramento over to the bottom right of the image. 1508 02:10:13,720 --> 02:10:16,340 So those are the same presentation. 1509 02:10:19,440 --> 02:10:28,260 Are there any other in-depth studies that are going to be done that will inform the conveyance project? 1510 02:10:28,260 --> 02:10:42,880 This is the story of study, and you're going to be looking at cultural resources of everything else, I guess, as you do these boring, but are there any other geological studies or other studies that have to be done? 1511 02:10:47,040 --> 02:10:53,060 So this project is, like I said, there was a review of the data that we already had along, 1512 02:10:53,180 --> 02:10:54,260 like we didn't see that. 1513 02:10:54,540 --> 02:10:58,320 There was a review of the data that geotechnical data that we had as a department. 1514 02:10:58,480 --> 02:11:03,180 We also solicited or the DCA for a solicited additional data from other projects going on 1515 02:11:03,180 --> 02:11:10,100 in the Delta like bridge construction projects and so they collected all of that and they chose 1516 02:11:10,100 --> 02:11:12,040 these locations based on the data gaps. 1517 02:11:12,040 --> 02:11:27,840 So as far as Delta Geology is concerned, this is what we feel as a good amount of information to support the consideration of Delta Geology for a new design and construction project. 1518 02:11:28,240 --> 02:11:29,700 Okay, that's what I wanted to know. 1519 02:11:29,920 --> 02:11:35,240 So you took, these are the studies that necessary to fill the gap then. 1520 02:11:35,380 --> 02:11:40,640 This is to fill the data gaps, and that's not to say that additional geotechnical information might not be necessary. 1521 02:11:40,640 --> 02:11:45,060 way down the line or even a little further down the line, 1522 02:11:47,700 --> 02:11:51,660 but any engineer, I don't do technical 1523 02:11:51,660 --> 02:11:58,340 engineer will tell you that when you're in construction, you're going to have more closer 1524 02:11:58,340 --> 02:12:02,800 located geotechnical data points that you might want to look at that kind of thing. So this 1525 02:12:02,800 --> 02:12:08,000 is not the end of the geotechnical studies that might need to be done if a project is approved, 1526 02:12:08,000 --> 02:12:18,560 But for the purposes of considering alternatives and looking at a new project right now, this is what we've proposed. 1527 02:12:18,920 --> 02:12:19,560 Okay. 1528 02:12:24,460 --> 02:12:26,080 Any other questions for Kathleen? 1529 02:12:28,720 --> 02:12:29,960 Thank you. 1530 02:12:30,580 --> 02:12:32,880 Thank you, President Agar. 1531 02:12:33,720 --> 02:12:37,280 At your convenience, I believe there may be some comments from the audience. 1532 02:12:40,410 --> 02:12:42,670 Any questions from the board at this point? 1533 02:12:42,670 --> 02:12:45,510 Okay, I'll open it up to comments from the public. 1534 02:12:52,110 --> 02:12:52,530 I'm Melinda. 1535 02:12:52,970 --> 02:12:54,650 Hello again, Melinda Terry, 1536 02:12:54,750 --> 02:12:56,130 Central Valley Flood Control Association. 1537 02:12:56,510 --> 02:12:58,870 These are two separate agenda items. 1538 02:12:59,050 --> 02:13:00,450 So I hope I am granted time. 1539 02:13:00,630 --> 02:13:02,110 I would like to talk about them separately. 1540 02:13:02,570 --> 02:13:03,010 Yeah, sure. 1541 02:13:03,570 --> 02:13:09,670 So first, I'll start with the NOP for the new Delta 1542 02:13:09,670 --> 02:13:12,170 Command's Project, the DCP, and that's 1543 02:13:12,170 --> 02:13:13,650 to be confused with the DCA. 1544 02:13:14,670 --> 02:13:16,610 But obviously this is the scoping period. 1545 02:13:16,610 --> 02:13:28,770 So we really hope that the flood board is going to comment and I'm just going to bring up some things that we hope you will consider both in this scoping phase and as it moves forward in your permitting phase. 1546 02:13:29,950 --> 02:13:39,630 But obviously the entire project has several modifications, alteration or encroachment, if you will, to the state plan of flood control facilities. 1547 02:13:39,630 --> 02:13:45,850 on the levees, you have the in-takes, and you also have anywhere between six-nate 1548 02:13:45,850 --> 02:13:50,090 barge facilities that they need to bring in a large of a lot of large 1549 02:13:50,790 --> 02:13:54,150 equipments and construction materials. 1550 02:13:56,290 --> 02:13:58,510 And in addition, so one of the things to 1551 02:13:58,510 --> 02:14:02,470 think about when you're doing that is not only will those particularly the 1552 02:14:02,470 --> 02:14:07,010 in-takes be a permanent encroachment into the floodflow capacity of that 1553 02:14:07,010 --> 02:14:10,390 But each of those barges will as well. 1554 02:14:10,950 --> 02:14:12,430 I'm not sure they call it temporary, 1555 02:14:12,510 --> 02:14:14,710 but this is a 14-year construction period. 1556 02:14:15,110 --> 02:14:18,950 We are guaranteed to have high water every single year 1557 02:14:18,950 --> 02:14:21,930 and really high water at least once during that, 1558 02:14:21,930 --> 02:14:25,570 you know, it probably twice during that 15-14-15-year period. 1559 02:14:26,870 --> 02:14:30,090 And the coffer dams themselves prior to these being built, 1560 02:14:30,830 --> 02:14:34,350 that will be again encroaching and reducing this floodflow capacity, 1561 02:14:34,350 --> 02:14:40,330 which means that water level is rising, so we have to accommodate that. Are they raising the 1562 02:14:40,330 --> 02:14:44,970 levees upstream and downstream so that we don't have overtopping in the delta? Because we haven't 1563 02:14:44,970 --> 02:14:50,590 had overtopping since the 80s, we don't want that to come back. Or is there a setback proposed 1564 02:14:50,590 --> 02:14:58,090 for the west side project levee? These are really things we hope you will consider and look at. 1565 02:15:00,000 --> 02:15:11,620 The levy stability is a big issue when you have a 14-year construction project that is going to require de-watering, that could affect the material in those levees. 1566 02:15:12,540 --> 02:15:23,560 These are every 75 feet apart. It's extensive de-watering. And then you also have vibration from that, right? Then you've got the pile driving from all these shafts that are going to be built. 1567 02:15:23,560 --> 02:15:25,260 the end takes these barge facilities. 1568 02:15:25,860 --> 02:15:27,280 They have a lot of other construction sites 1569 02:15:27,280 --> 02:15:30,420 about 21 facilities being built. 1570 02:15:30,720 --> 02:15:32,540 Some of them are going to have that pile driving. 1571 02:15:33,100 --> 02:15:34,700 On top of that, you get the vibrations 1572 02:15:34,700 --> 02:15:36,380 from the truck traffic. 1573 02:15:36,820 --> 02:15:39,640 Muck trucks, I know, we're going to do eight trips per day. 1574 02:15:39,760 --> 02:15:42,000 How many trucks are doing eight trips per day? 1575 02:15:42,240 --> 02:15:45,620 I'm not sure of, but you've also got concrete plants 1576 02:15:45,620 --> 02:15:46,540 and fuel stations. 1577 02:15:46,540 --> 02:15:49,520 A lot of truck traffic that is going over these levies. 1578 02:15:49,740 --> 02:15:51,760 So it's that cumulative impact 1579 02:15:51,760 --> 02:15:53,460 that I would call seismic. 1580 02:15:54,460 --> 02:15:57,700 And you've got under ground tunneling. 1581 02:15:57,900 --> 02:16:00,980 There's a lot of vibration activity that we don't know. 1582 02:16:01,140 --> 02:16:03,920 How's going to affect these levels that we hope you will consider. 1583 02:16:06,380 --> 02:16:09,600 And then going back to that cumulative impacts, 1584 02:16:09,760 --> 02:16:12,990 the cumulative impacts of that flood flow capacity loss. 1585 02:16:13,700 --> 02:16:16,160 So you've got three intakes on the Sacramento River, 1586 02:16:16,360 --> 02:16:21,740 plus you have eight barges that are located in different 1587 02:16:21,740 --> 02:16:27,440 Each of them are designed to have a certain flood flow capacity, what's that loss of capacity 1588 02:16:27,440 --> 02:16:32,560 in each of those on a cumulative basis to your system in that part? 1589 02:16:33,000 --> 02:16:37,360 Because that needs to be analyzed and hope that you'll look at that as well. 1590 02:16:37,720 --> 02:16:43,220 We obviously will have a change in the hydrodynamics, which could create erosion and maintenance 1591 02:16:43,220 --> 02:16:48,200 issues on your system, that really needs to be looked at. 1592 02:16:48,200 --> 02:17:02,700 And then finally really a big issue during a 14-year construction project is how is it going to, in fact, your LMAs being able to do their loving inspections, their annual maintenance, 1593 02:17:03,600 --> 02:17:11,200 to get to bullets in 1952, 802, and of course their fled fighting and repair. 1594 02:17:12,480 --> 02:17:18,040 That really all needs to occur, you know, particularly the inspections and maintenance on an annual basis, 1595 02:17:18,820 --> 02:17:23,560 and really needs to be accommodated and can't, you know, be satisfied for any given year. 1596 02:17:23,660 --> 02:17:30,640 So that's that one, and then I'll move on to the second agenda item, which is the Delta Drilline negative duck. 1597 02:17:32,740 --> 02:17:37,920 Obviously, one of the things I was kind of hoping today, and it wasn't as specific, maybe, 1598 02:17:38,160 --> 02:17:43,160 and so I don't know, it sounds like you've got a permit pending and coming, and I am hoping 1599 02:17:43,160 --> 02:17:47,960 during your process, there can be more detailed discussion of where these locations really 1600 02:17:47,960 --> 02:17:48,260 are. 1601 02:17:48,380 --> 02:17:50,820 Out of that, what did she say? 1602 02:17:51,760 --> 02:17:57,720 I think there was 25 borings in your jurisdiction that were on land. 1603 02:17:59,020 --> 02:18:03,820 Where exactly were those were they going to go through the levy or the adjacent to the levy? 1604 02:18:04,220 --> 02:18:09,540 I know our LMAs have different concerns on whether they're through or next to because there's 1605 02:18:09,540 --> 02:18:16,380 Artesian Will, a well potential, but it also where exactly are those going to be so that we know 1606 02:18:16,380 --> 02:18:21,960 or they project non-project to dealing with you and really what the condition of those levy's are. 1607 02:18:21,960 --> 02:18:28,960 Another issue that we had raised with the DCA was the sharing of that boring information 1608 02:18:28,960 --> 02:18:32,360 with the local LMA in if it's a project levy with you. 1609 02:18:32,620 --> 02:18:37,440 That can be extremely useful as you can imagine for all of us to know what's inside 1610 02:18:37,440 --> 02:18:39,760 of where the boring is occurring. 1611 02:18:40,180 --> 02:18:47,540 At the last stakeholder engagement meeting, they did say that they don't think they're 1612 02:18:47,540 --> 02:18:49,380 going to be able to share that information now. 1613 02:18:49,580 --> 02:18:51,080 It might be a legal reason. 1614 02:18:51,080 --> 02:19:00,080 So I think we need to continue those conversations and help each other in that and try to find our way around that. 1615 02:19:00,740 --> 02:19:11,780 And the location of where these are is really important because as I said, I guess this last month's meeting when I brought this up and request this item and I forgot to say thank you for having this on the agenda. 1616 02:19:11,780 --> 02:19:22,320 as I did ask for it, so I appreciate it, is so that we could have a better idea of, you know, 1617 02:19:22,400 --> 02:19:25,760 where are the interference with, because we got the same interference issues in the terms 1618 02:19:25,760 --> 02:19:31,020 of our annual inspections, you know, the maintenance, the repair, the flood fighting, what 1619 02:19:31,020 --> 02:19:31,460 the boring. 1620 02:19:31,460 --> 02:19:35,800 I'm not exactly sure what time of year, you know, how long it's going to be, but we really 1621 02:19:35,800 --> 02:19:39,500 hope that through your permitting process, we're going to make sure to accommodate that 1622 02:19:39,500 --> 02:19:44,820 conditions are set, so that any, particularly improvement and repair work that needs to 1623 02:19:44,820 --> 02:19:48,600 occur, it's not going to be affected, and that's why these specific sites would really, 1624 02:19:48,600 --> 02:19:52,880 really be important, because as you know, our folks kind of know what they have planned out ahead, 1625 02:19:52,980 --> 02:19:55,680 and I don't want to have that interference. 1626 02:19:59,120 --> 02:19:59,980 But, and as I had mentioned, 1627 02:20:00,000 --> 02:20:07,060 At the last meeting, the M&D didn't actually have any discussion of, okay, we're going to be boring in 1628 02:20:07,060 --> 02:20:14,720 through or, you know, next to levees and so there were no mitigations. And so that still I didn't hear that really addressed 1629 02:20:14,720 --> 02:20:20,220 in this, what's going to happen with this final and whether that, in fact, is a plan for them to mitigate. 1630 02:20:20,400 --> 02:20:27,020 As I mentioned last month for residential and businesses, structures, they're going to have a hundred-foot exclusion zone. 1631 02:20:27,780 --> 02:20:39,020 Obviously, they're not if they're going to bore through one or next two, but it would be nice to know what medications they do have planned and hopefully during your permitting process that can be brought up. 1632 02:20:39,520 --> 02:20:44,000 Finally, I just want to bring up a couple of things that relate to both of these projects. 1633 02:20:45,000 --> 02:20:51,020 One is, I guess it relates more to the DCP itself, but they mentioned the stakeholder engagement. 1634 02:20:51,020 --> 02:20:53,580 and it's important to understand when we do appreciate 1635 02:20:53,580 --> 02:20:55,420 because they're actually having a level of discussion 1636 02:20:55,420 --> 02:20:58,860 with the locals with some of the descriptions 1637 02:20:58,860 --> 02:21:02,980 that they can at this point and we didn't get that before, 1638 02:21:03,420 --> 02:21:05,840 but they aren't allowed to talk about any of the mitigations 1639 02:21:05,840 --> 02:21:09,540 because no EIR stuff is allowed to be discussed at those. 1640 02:21:09,920 --> 02:21:12,280 So it's kind of a weird place to be 1641 02:21:12,960 --> 02:21:21,000 and locals can bring up issues but they can't bring up 1642 02:21:21,000 --> 02:21:25,120 there is going to be a report regularly to the California Water Commission on that project. 1643 02:21:25,580 --> 02:21:31,440 I would suggest again because there are numerous alterations of your system that it seems like 1644 02:21:31,440 --> 02:21:35,840 there should actually be a regular thing here. That each time they are bringing some of that 1645 02:21:35,840 --> 02:21:41,260 very detailed information forward to you. That's really specific to your the changes to your 1646 02:21:41,260 --> 02:21:46,340 project not. You know we saw a nice overall what the project is and purposes and some general 1647 02:21:46,340 --> 02:21:54,480 things, but I hope in the future they'll come back and really give you some more specific things related to your project and I'll end it there. 1648 02:21:54,780 --> 02:21:55,340 Thank you. 1649 02:21:56,420 --> 02:21:57,160 Oh, OK. 1650 02:21:57,520 --> 02:21:59,920 Joe, really caught my attention. 1651 02:22:00,520 --> 02:22:05,360 You said there might be some legal issue was sharing the data. 1652 02:22:06,180 --> 02:22:07,600 I can't understand that. 1653 02:22:08,040 --> 02:22:09,240 Yeah, I can't speak more to that. 1654 02:22:09,440 --> 02:22:12,300 So I will let them answer that. 1655 02:22:12,300 --> 02:22:13,340 Thank you. 1656 02:22:13,340 --> 02:22:26,600 So, at the SEC meeting, they're talking about historical data that DWR collected on private land and so there are issues related to our contracts with those private landowners and being allowed to share that information with the public. 1657 02:22:28,320 --> 02:22:38,340 For any effort that happens on public lands or within the specific landmen and agencies right away, we can obviously share the data with them. 1658 02:22:38,340 --> 02:22:45,820 So, any data that was gathered would be available? 1659 02:22:46,660 --> 02:22:53,880 Potentially, it depends on the agreement that we have with the entity who owns that property. 1660 02:22:57,860 --> 02:23:01,740 I don't understand a legal system, but I'll defer to it later. 1661 02:23:05,840 --> 02:23:07,840 Okay, any other questions at this point? 1662 02:23:07,840 --> 02:23:15,840 and I think it's important that since we're obviously going to have to issue the 408 1663 02:23:17,080 --> 02:23:23,560 per meter or work with the letter to get that corridor to proceed. 1664 02:23:24,120 --> 02:23:27,640 Is the core involved in these meetings and so on? 1665 02:23:29,140 --> 02:23:30,600 I'm going to have to defer. 1666 02:23:31,040 --> 02:23:33,120 What is the carrier she's interacted with? 1667 02:23:33,800 --> 02:23:36,220 Yes. We've been talking to the core regularly. 1668 02:23:36,220 --> 02:23:40,500 We have a lot of coordination meetings set up at multiple levels with them. 1669 02:23:42,680 --> 02:23:43,720 Okay, I think, 1670 02:23:46,510 --> 02:23:51,550 well, I guess we're going to be having this discussion next month, right, 1671 02:23:52,010 --> 02:23:54,610 where they want the court letter approved. 1672 02:23:55,950 --> 02:24:01,450 Yeah, and they want an objection letter from the board and Andrew Buckley and her officer 1673 02:24:01,450 --> 02:24:04,950 are working with their staff on our comment letters from the board. 1674 02:24:05,750 --> 02:24:06,210 All right. 1675 02:24:07,970 --> 02:24:08,950 Okay, 1676 02:24:11,070 --> 02:24:14,470 no other questions we'll see you next month. 1677 02:24:14,650 --> 02:24:15,770 Thank you. 1678 02:24:24,680 --> 02:24:27,020 Okay, we're under a D, 1679 02:24:29,170 --> 02:24:32,430 and this is Dave Wildon's project, Morning David. 1680 02:24:36,120 --> 02:24:38,480 Good morning, President Edgar, members of the board. 1681 02:24:40,580 --> 02:24:44,140 Jeremy Eric, my name is Dave Wildon, I'm with the Department of Water Resources, 1682 02:24:44,140 --> 02:24:50,880 supervising engineer with Division of Flood Management. Jeremy Erick in his report on the 1683 02:24:50,880 --> 02:24:56,540 Department's activities gave a brief introduction to what I'm going to be talking about today, 1684 02:24:56,740 --> 02:24:59,940 the 2017 and 2019 Storm Damage Emerging. 1685 02:25:00,620 --> 02:25:07,280 Rehabilitation program, both the state led and the federal actions resulting from those storm events. 1686 02:25:08,180 --> 02:25:12,680 I wanted to thank Jeremy for the kind of the kudos that he mentioned. 1687 02:25:13,500 --> 02:25:18,420 And one of the roles as program manager is to take sole credit for all the achievements of the program. 1688 02:25:19,740 --> 02:25:26,200 But no, the reality is it was a huge effort by the department staff and all of our partners. 1689 02:25:26,200 --> 02:25:31,620 So I do appreciate the recognition of that and wanted to reiterate that the numerous partners 1690 02:25:31,620 --> 02:25:37,440 that we work with obviously could not have this project could not have been done under the 1691 02:25:37,440 --> 02:25:39,180 timeframes that we did it. 1692 02:25:39,320 --> 02:25:40,840 So I wanted to recognize them. 1693 02:25:41,060 --> 02:25:41,140 Thank you. 1694 02:25:44,000 --> 02:25:52,900 I as were well familiar primarily in 2017, but also in 2019 we had a historical precipitation 1695 02:25:52,900 --> 02:26:00,860 highest in two decades, 17, we had a 26 and 2019 almost 25 inches of precipitation for that water 1696 02:26:00,860 --> 02:26:09,300 year. The Sacramento Weir opened for the first time since 2006 and the Oraville spillway, 1697 02:26:09,300 --> 02:26:15,260 oraville dam spillway incident also kind of captured the attention a lot of the water delivery 1698 02:26:15,260 --> 02:26:16,240 and flood communities. 1699 02:26:18,420 --> 02:26:22,740 But as a result of these storms, we did see significant damage to 1700 02:26:22,740 --> 02:26:27,240 flood control, flood protection system throughout the state plan of flood control in the Sacramento 1701 02:26:27,240 --> 02:26:29,600 River in San Joaquin River systems. 1702 02:26:30,380 --> 02:26:36,240 DWR immediately expanded $5 million for direct assistance during the storm events. 1703 02:26:36,400 --> 02:26:41,360 We worked with the Army Corps of Engineers while the events were happening to enact emergency 1704 02:26:41,360 --> 02:26:49,900 repairs after the water subsided that damages were recognized. 1705 02:26:50,580 --> 02:27:02,420 The Army Corps of Engineers opened up their PL-8499 program, where they requested reports of damages for their evaluation for repair under the PL-8499 rehabilitation program. 1706 02:27:04,160 --> 02:27:12,480 The Corps leading that screening took a look at their eligibility requirements, determined the sites that they would repair, 1707 02:27:12,480 --> 02:27:19,060 and then DWR also made an evaluation of those sites and the sites that were not being identified 1708 02:27:19,060 --> 02:27:22,760 to be repaired under the PL-8499 program. 1709 02:27:26,800 --> 02:27:35,040 The result of the reporting and the site evaluation and acceptance determined there were a number 1710 02:27:35,040 --> 02:27:40,900 of repairs that were needed and additional areas of concern that required continued monitoring. 1711 02:27:40,900 --> 02:27:46,340 This figure shows kind of the spatial distribution throughout the Central Valley, the state 1712 02:27:46,340 --> 02:27:51,760 plan of flood control of where these problem areas were found. 1713 02:27:52,300 --> 02:27:55,680 You can see a pretty high concentration of them in the Sacramento Valley, the immediate 1714 02:27:55,680 --> 02:27:56,600 Sacramento Valley. 1715 02:27:57,160 --> 02:28:05,440 But going as far north up into north of Chico and south of Modesto also, we'll talk about a 1716 02:28:05,440 --> 02:28:06,220 little bit of this later. 1717 02:28:06,220 --> 02:28:14,080 but the numbers turned out to be the core identified 45 specific repair sites as air priorities 1718 02:28:14,080 --> 02:28:21,780 and acceptable under PL-8499 real-bilitation, DWR identified 38 other sites that we rated 1719 02:28:21,780 --> 02:28:28,420 as critical, requiring immediate attention for repair, another 81 sites, the state identified 1720 02:28:28,420 --> 02:28:34,020 as serious, adding to the list the repairs to be addressed after the critical repairs. 1721 02:28:34,020 --> 02:28:50,540 And then another 235 sites where that we've identified as area of concern, essentially requiring continued monitoring by the local levy maintaining agencies to ensure or to identify any new problems that are resulting those damages. 1722 02:28:51,540 --> 02:28:56,940 Again, in 2019 we had a significant high water event that resulted in damages. 1723 02:28:56,940 --> 02:29:03,660 is the core, again, opened up their PL-8499 rehabilitation program and they identified five sites 1724 02:29:03,660 --> 02:29:05,620 to be repaired as a priority. 1725 02:29:06,260 --> 02:29:12,100 DWR did not identify any additional sites resulting from the 2019 storms, so we're able 1726 02:29:12,100 --> 02:29:15,400 to still focus on the repairs from 2017. 1727 02:29:20,290 --> 02:29:25,990 The core identified their sites and then put them into a prioritization process. 1728 02:29:25,990 --> 02:29:32,090 This describes the essentially their prioritization that they use and one way to look at it is, 1729 02:29:32,730 --> 02:29:37,610 is they looked at the severe damages first as a higher priority and then the moderate damages. 1730 02:29:38,190 --> 02:29:45,310 And then within each of those categories looked at the urban protection and then moved on to the rural protection. 1731 02:29:45,430 --> 02:29:53,950 So the higher priority would be the severe damages in the urban areas, the next level of priority is severe damages in the rural areas. 1732 02:29:53,950 --> 02:29:57,990 and then moving on down with the moderate damages on the same approach. 1733 02:30:02,800 --> 02:30:19,460 So, as I mentioned previously, the Corps identified 45 sites that were needed for repair that they were eligible for repair under PL-8499 rehabilitation assistance, 32 in the Sacramento River Basin, 13 in the San Joaquin River Basin. 1734 02:30:19,460 --> 02:30:28,780 of the remaining reported sites, there were requested reported damage sites. 1735 02:30:29,020 --> 02:30:34,540 There were over 300 that were determined to be not actionable by the Army Corps of Engineers, 1736 02:30:34,800 --> 02:30:37,720 although into those categories in a minute. 1737 02:30:43,730 --> 02:30:51,150 Similar for the 2019 Winter Stormly Corps identified five sites that were actionable under 1738 02:30:51,150 --> 02:30:52,310 the PL-84-99. 1739 02:30:53,410 --> 02:30:56,170 There were 46 other requested sites that 1740 02:30:56,170 --> 02:30:58,310 were determined to be not no action 1741 02:30:58,310 --> 02:31:00,350 under the PL-84-99 program. 1742 02:31:07,310 --> 02:31:09,750 So after the core made their determination 1743 02:31:09,750 --> 02:31:11,210 of which sites, they would repair 1744 02:31:11,210 --> 02:31:14,110 under the PL-84-99 program the state. 1745 02:31:14,270 --> 02:31:15,850 What they've noticed about— 1746 02:31:15,850 --> 02:31:20,870 Just going back to those numbers for the 300 and the 46 1747 02:31:21,230 --> 02:31:24,650 that were not considered how many of those were 1748 02:31:24,650 --> 02:31:29,230 because they didn't, they were active, the reaches were active. 1749 02:31:30,410 --> 02:31:36,110 The majority of those that were no action on the core were because they were not 1750 02:31:36,110 --> 02:31:37,810 PL-8499 eligible. 1751 02:31:39,070 --> 02:31:40,570 The majority of them. 1752 02:31:40,970 --> 02:31:41,030 Yeah. 1753 02:31:41,690 --> 02:31:42,530 Well, yes. 1754 02:31:43,030 --> 02:31:45,130 I would say, well, we'll get into the numbers later. 1755 02:31:46,050 --> 02:31:51,790 The numbers of sites that DWR picked up for repair, that actually would be the number 1756 02:31:51,790 --> 02:31:54,590 that was not eligible for PL-8499. 1757 02:31:55,170 --> 02:31:59,210 They still had damages that were severe enough that needed to be addressed, but they were not 1758 02:31:59,210 --> 02:32:00,850 eligible under PL-8499. 1759 02:32:01,570 --> 02:32:05,690 So that's where the department was able to come in with that transfer of funding and pick 1760 02:32:05,690 --> 02:32:06,130 those sites. 1761 02:32:06,330 --> 02:32:14,630 So if you look at the DWR numbers, those are the ones that we picked up because they weren't 1762 02:32:14,630 --> 02:32:15,310 eligible. 1763 02:32:15,870 --> 02:32:17,750 They were active, I guess. 1764 02:32:17,990 --> 02:32:27,670 Mostly, and a very small percent were not, well, a larger percent, but DWR also evaluated 1765 02:32:27,670 --> 02:32:28,150 the sites. 1766 02:32:28,330 --> 02:32:29,630 A number of them were determined. 1767 02:32:29,830 --> 02:32:34,710 They didn't have enough damage, a small number were being repaired under other programs, 1768 02:32:35,250 --> 02:32:38,290 so a few reasons why they weren't picked up under either program. 1769 02:32:39,350 --> 02:32:40,170 Thank you. 1770 02:32:44,860 --> 02:32:50,000 So after the Army Corps evaluated their sites, DWR looked at the remaining 1771 02:32:50,000 --> 02:32:57,860 balance and did a similar prioritization to how the court did it, looking at the most severe 1772 02:32:57,860 --> 02:33:07,440 damages and then prioritizing within those severe and moderate damage sites, prioritizing 1773 02:33:07,440 --> 02:33:11,700 those based on essentially on protected assets, urban versus rural. 1774 02:33:13,300 --> 02:33:18,720 The critical sites are the sites that we determined were likely to fail in the next 1775 02:33:18,720 --> 02:33:24,740 high water event, those were the critical sites that we wanted to jump on right away, so 1776 02:33:24,740 --> 02:33:29,400 those were, we didn't have to do any prioritization because we were able to address those 1777 02:33:29,400 --> 02:33:29,660 all. 1778 02:33:30,000 --> 02:33:34,520 The serious sites, that's where it's coming in more into the prioritization because a longer 1779 02:33:35,240 --> 02:33:42,340 time to get those repaired and then a number of those sites are currently not funded right now, 1780 02:33:43,360 --> 02:33:46,380 so the prioritization of those serious sites were needed. 1781 02:33:47,140 --> 02:33:51,980 Syria sites are defined as a site that is likely to become critical and the next high water 1782 02:33:51,980 --> 02:33:58,660 event and then the next level down is the area of concern or the monitor sites and those 1783 02:33:58,660 --> 02:34:03,460 are sites that the damage wasn't severe enough to be categorized as serious but they still 1784 02:34:03,460 --> 02:34:11,600 had some damages that is likely to increase in other future flood events so the program of monitoring 1785 02:34:11,600 --> 02:34:18,680 on the local level to identify the rate of erosion or the severity of those sites with future events. 1786 02:34:22,610 --> 02:34:23,250 Jane. 1787 02:34:27,460 --> 02:34:31,280 May I get to this but I was what's going on here. 1788 02:34:35,400 --> 02:34:36,800 You might get to this but I 1789 02:34:36,800 --> 02:34:43,600 occurred to me to ask this question in analysis of priority or sites to be repaired. Do you 1790 02:34:43,600 --> 02:34:50,420 take any consideration locations that have failed in the past or have multiple fail at your 1791 02:34:50,420 --> 02:34:51,700 over time? 1792 02:34:52,660 --> 02:34:59,980 Or this assessment related to the storm damages, we essentially just looked at existing. 1793 02:35:01,460 --> 02:35:17,480 So if they had a previous history of it, that wasn't part of the consideration, but if it was a critical site, obviously, that went into the initial prioritization and all the critical sites were addressed to begin with. 1794 02:35:18,160 --> 02:35:23,740 But specifically, no, that wasn't something we looked at for the storm damage related prioritization and evaluation. 1795 02:35:23,740 --> 02:35:24,640 Okay. 1796 02:35:26,220 --> 02:35:26,400 Why? 1797 02:35:28,320 --> 02:35:39,620 Dave, for those projects or for those repairs, which were under the PL-8499 program, were there any that the core rejected because they didn't need BC ratios? 1798 02:35:41,540 --> 02:35:47,960 I believe there may have been just maybe one site that fell under that category. 1799 02:35:48,560 --> 02:35:54,800 A number were rejected that were PL-84-99 eligible, but the damage wasn't determined to be 1800 02:35:54,800 --> 02:36:01,040 severe enough, or it was identified as previously damaged before the storm, so they 1801 02:36:01,040 --> 02:36:02,400 couldn't link it to the storm. 1802 02:36:02,920 --> 02:36:09,240 But to your specific question about the BC ratio, the economically justified, I think there 1803 02:36:09,240 --> 02:36:11,500 was one site that fell under that. 1804 02:36:11,540 --> 02:36:12,440 Thank you. 1805 02:36:16,580 --> 02:36:18,660 As I mentioned before, the definition of critical, 1806 02:36:18,980 --> 02:36:22,180 this is a picture that shows a pretty good example 1807 02:36:22,180 --> 02:36:24,240 of a critically damaged levy. 1808 02:36:24,860 --> 02:36:27,860 Obviously, the erosion is into the levy prism. 1809 02:36:28,740 --> 02:36:30,940 Another high water event would contribute 1810 02:36:30,940 --> 02:36:33,760 to this erosion and likely cause its failure. 1811 02:36:34,920 --> 02:36:37,300 So this is a good example of a site 1812 02:36:37,300 --> 02:36:40,680 that has had some erosion failure 1813 02:36:40,680 --> 02:36:42,300 that we identified as critical. 1814 02:36:46,270 --> 02:36:51,570 Sirius, our definition is a site that is likely to become critical in the next highwater 1815 02:36:51,570 --> 02:36:51,970 event. 1816 02:36:52,410 --> 02:36:58,110 This is a picture that may show a little, it looks a little severe, it looks like it might 1817 02:36:58,110 --> 02:36:59,210 be a critical site. 1818 02:36:59,830 --> 02:37:05,430 There is a significant amount of erosion at this location, but I included this picture to 1819 02:37:05,430 --> 02:37:10,810 show that it does meet the definition of Sirius, it's hard to see, but there is a little 1820 02:37:10,810 --> 02:37:17,110 of a bench on this at this location, and when we did our evaluation, we took sections of the 1821 02:37:17,110 --> 02:37:23,840 levy. It did show that the erosion was not into the levy prism yet even below the water surface 1822 02:37:25,050 --> 02:37:34,050 elevation. So it was technically a serious site. A lot of the, you know, just a initial evaluation 1823 02:37:34,050 --> 02:37:39,150 and just looking at it, you might think it's definitely a critical site, but further examination 1824 02:37:39,150 --> 02:37:44,030 to show that this is a serious site, but I would say it's on the higher end of the serious, 1825 02:37:44,390 --> 02:37:48,130 so it's taking a higher priority within that serious categorization. 1826 02:37:51,550 --> 02:37:57,930 There were a number of no-action sites, both on the core and the DWR side, the reasons for identifying 1827 02:37:57,930 --> 02:38:05,330 those that were not actionable. The damage was not severe enough or not observed from the report 1828 02:38:05,330 --> 02:38:06,370 that was submitted. 1829 02:38:06,990 --> 02:38:10,610 Damage was pre-existing to the 2017 storms. 1830 02:38:11,370 --> 02:38:14,370 Damages were paired under another program or local action, 1831 02:38:14,730 --> 02:38:17,730 or had a near-term plan for those repairs. 1832 02:38:18,490 --> 02:38:22,110 And for the core, obviously, they only accepted repairs 1833 02:38:22,110 --> 02:38:25,930 for districts that were eligible under PL84.99 1834 02:38:25,930 --> 02:38:27,670 for their rehabilitation program. 1835 02:38:29,290 --> 02:38:32,650 So those are some good photos. 1836 02:38:32,650 --> 02:38:37,290 So are we using drones to get those type of photos of this? 1837 02:38:38,110 --> 02:38:38,630 Yeah. 1838 02:38:38,830 --> 02:38:38,970 Yeah. 1839 02:38:39,130 --> 02:38:42,950 We did do a lot of drone use during this time. 1840 02:38:43,670 --> 02:38:45,950 The state has a drone program. 1841 02:38:46,410 --> 02:38:48,010 They were pretty tied up with Oraville. 1842 02:38:48,250 --> 02:38:50,670 We used our consultant to help us out. 1843 02:38:50,730 --> 02:38:57,210 So we've got some really good before and after drone footage of a lot of the repairs and sight. 1844 02:38:57,410 --> 02:38:59,170 So yeah, we're definitely using that technology. 1845 02:38:59,470 --> 02:39:00,730 It's better in the old days. 1846 02:39:02,050 --> 02:39:04,450 The boat in the camera, yes. 1847 02:39:10,160 --> 02:39:15,760 So for the DWR's repairs, this summarizes our 2017 1848 02:39:15,760 --> 02:39:18,060 winter storm evaluations. 1849 02:39:19,000 --> 02:39:22,040 So we identified 38 sites that were rated as critical 1850 02:39:22,040 --> 02:39:25,680 in the need of immediate repair before the next flood season. 1851 02:39:26,500 --> 02:39:29,060 81 sites were rated serious. 1852 02:39:29,760 --> 02:39:33,480 And then another 235 for the area of concern 1853 02:39:33,480 --> 02:39:38,680 or monitor, and then maybe close to 70 for the no-action. 1854 02:39:40,970 --> 02:39:47,150 And the 38 and the 81, those of the sites that we are focusing our repair effort on are 1855 02:39:47,150 --> 02:39:47,910 critical sites. 1856 02:39:48,030 --> 02:39:53,230 The 38 have all been repaired in 2017 and 18, and we're working through the balance of 1857 02:39:53,230 --> 02:39:57,170 the repairs of the serious sites in the next two or three years. 1858 02:40:02,830 --> 02:40:04,790 Quick note on the permitting. 1859 02:40:07,510 --> 02:40:11,470 In recognition of the big effort that it would take to get this program pushed 1860 02:40:11,470 --> 02:40:18,490 through, and based on the experience we had in 2006, we needed to have frequent and early 1861 02:40:18,490 --> 02:40:25,290 coordination with all of our partner agencies. We put together a unified command group and got 1862 02:40:25,290 --> 02:40:34,730 from a lot of the decision makers and managers of these not only the regulatory agencies, but also the 1863 02:40:34,730 --> 02:40:44,870 Army Corps of Engineers and our other partners. For the state-led critical sites, we used the 1864 02:40:44,870 --> 02:40:52,930 governor's storm damaging emergency proclamations to allow us to use emergency permitting considerations 1865 02:40:52,930 --> 02:40:55,690 for our critical repairs, 1866 02:40:59,210 --> 02:41:03,330 that consideration ended once we completed the critical sites. 1867 02:41:03,470 --> 02:41:07,950 So now we're into the serious sites, and those are being permitted under normal non-emergency 1868 02:41:07,950 --> 02:41:08,630 timelines. 1869 02:41:10,630 --> 02:41:18,130 We also had tribal engagement throughout the program, initially according to our DWR tribal 1870 02:41:18,130 --> 02:41:25,150 engagement policy, and then after the first year AB 52 requirements kicked in, and we're 1871 02:41:25,150 --> 02:41:27,230 following those for the future repairs. 1872 02:41:34,020 --> 02:41:40,640 We recognized the need to have contingency plans in place, knowing that the repair of 1873 02:41:40,640 --> 02:41:42,840 these sites would take a number of years. 1874 02:41:43,600 --> 02:41:49,940 So we developed contingency plans for all of the sites that didn't work being immediately 1875 02:41:49,940 --> 02:41:57,540 repaired and for the area of concern sites also. Essentially, 1876 02:41:59,700 --> 02:42:01,000 these contingency plans 1877 02:42:01,000 --> 02:42:13,800 identified likely method of failure, possible emergency fixes and then notifications of 1878 02:42:13,800 --> 02:42:23,860 of using the flood operation center, flood threat mitigation process, which kind of identifies 1879 02:42:23,860 --> 02:42:30,880 the locals to monitor and flood fight, and then once their resources are expanded, it kind 1880 02:42:30,880 --> 02:42:36,020 of moves up the chain, it goes to county, then it goes to state for their level of assistance. 1881 02:42:40,550 --> 02:42:46,690 The sample of the contingency plans showing the potential flood fight methods that could be used 1882 02:42:46,690 --> 02:42:50,190 during the emergency estimate of the material 1883 02:42:50,190 --> 02:42:51,810 and a description of the project, 1884 02:42:52,190 --> 02:42:54,650 a very problem and proposed solution. 1885 02:43:00,700 --> 02:43:03,520 So this is a good table that kind of shows 1886 02:43:03,520 --> 02:43:07,560 the overall response, where we're at to this point. 1887 02:43:07,960 --> 02:43:10,160 And then what we are looking for in the future, 1888 02:43:11,200 --> 02:43:15,620 as we've shown for DWR, we've repaired 38 sites 1889 02:43:15,620 --> 02:43:19,220 in 2017 and 18, and 29, and 9, 1890 02:43:19,220 --> 02:43:21,400 those were the critical sites I talked about. 1891 02:43:21,920 --> 02:43:27,040 We have currently were funded to repair an additional 32 sites 1892 02:43:27,040 --> 02:43:30,720 that we've identified as serious, starting this summer 1893 02:43:30,720 --> 02:43:32,520 and going next year. 1894 02:43:33,740 --> 02:43:36,980 That leaves a remaining balance on our end 1895 02:43:36,980 --> 02:43:39,980 on the state side of about almost 50 sites 1896 02:43:39,980 --> 02:43:42,580 that we are seeking funding to continue 1897 02:43:42,580 --> 02:43:44,560 repair of those serious sites. 1898 02:43:44,560 --> 02:43:55,700 For the core, the total of the 45 sites from the 2017 storms, there are plans to repair all of those to date 1899 02:43:58,550 --> 02:44:06,310 almost 30 have been repaired and with plans to repair the remaining 15 in the next year or two. 1900 02:44:06,790 --> 02:44:15,750 Similarly, with their 2019 storms, there are five sites to be repaired, one of them has been repaired and four more to be repaired in the subsequent years. 1901 02:44:17,730 --> 02:44:25,630 So the court doesn't have any unfunded sites, all of the sites they've identified for repair 1902 02:44:25,630 --> 02:44:32,810 from the 2017 and 19 storms have a plan and are funded for repair by the end of 2020. 1903 02:44:33,030 --> 02:44:34,730 May stretch into 2021. 1904 02:44:39,650 --> 02:44:41,970 Just a few photos here showing the work that we've done. 1905 02:44:42,090 --> 02:44:49,750 This is a typical water side rock slope repair erosion is cutting into the levy, so the solution 1906 02:44:49,750 --> 02:44:56,490 is to clean off the levy surface, come back in and rebuild it with the new import material 1907 02:44:56,490 --> 02:44:59,990 rock, rock soil mixture above the wall. 1908 02:45:00,000 --> 02:45:05,640 Waterline to encourage hydroceed in plant growth and mitigation growth. 1909 02:45:10,660 --> 02:45:34,240 Another walk, water side rock slope protection, construction. This is a water side access by the barge. If we can use this method, we try to encourage that from our contracting, because it's a much quicker approach. It has less impact on the hall routes and the surrounding areas, which becomes a critical. 1910 02:45:34,480 --> 02:45:38,880 issue. Oh, a little video here. This is kind of good. 1911 02:45:52,590 --> 02:45:54,370 So you can see that the speed with which 1912 02:45:54,370 --> 02:46:01,010 we can place this material is very advantageous to getting these projects done. 1913 02:46:03,770 --> 02:46:12,130 How does state this? You know, I drive down the delta and down the Sacramento River and 1914 02:46:12,130 --> 02:46:16,730 I see rock every place. Is there an end to the rock? 1915 02:46:19,130 --> 02:46:20,330 Another, you know what I'm saying? 1916 02:46:20,330 --> 02:46:23,030 Is our supply source for all this rock? 1917 02:46:25,250 --> 02:46:27,010 I really don't. 1918 02:46:27,490 --> 02:46:28,650 I haven't heard that. 1919 02:46:28,790 --> 02:46:31,490 I haven't heard any of the suppliers, the queries. 1920 02:46:32,890 --> 02:46:34,470 Express that concern, our construction. 1921 02:46:34,970 --> 02:46:37,810 Side on DOE is not indicated that. 1922 02:46:38,630 --> 02:46:41,610 But we'll be in a bad way if, I mean, 1923 02:46:42,330 --> 02:46:42,830 well, anyway. 1924 02:46:43,170 --> 02:46:46,230 It's likely that we'll just have to expand our reach 1925 02:46:46,230 --> 02:46:47,650 to get this material. 1926 02:46:47,650 --> 02:46:54,270 You know, further increasing the cost, you know, right now we take the closest available source that 1927 02:46:54,270 --> 02:46:58,710 I'll just continue to get further away from the areas that we need them as what I would suspect. 1928 02:47:02,130 --> 02:47:06,270 Here's a typical landside rock slope prepare in the later stages. 1929 02:47:06,390 --> 02:47:07,690 This is after hydroceeding. 1930 02:47:08,050 --> 02:47:11,870 There's the stakes in place to control the erosion control fabric. 1931 02:47:12,830 --> 02:47:17,370 So just a recognition that we have rocks slope prepared both on the water side and the landside 1932 02:47:17,370 --> 02:47:19,130 for many of the add many of these sites. 1933 02:47:22,890 --> 02:47:26,270 Another aerial drone view of a small, 1934 02:47:26,810 --> 02:47:30,010 erosion location that would be repaired. 1935 02:47:32,720 --> 02:47:35,380 Looks like likely a serious site, 1936 02:47:35,640 --> 02:47:37,100 it doesn't seem to be too impactful 1937 02:47:37,100 --> 02:47:38,020 of the levy prism. 1938 02:47:40,400 --> 02:47:40,920 Here we go. 1939 02:47:42,320 --> 02:47:44,420 Dave, Dave, do you know how much that would cost? 1940 02:47:44,800 --> 02:47:46,820 Or, you know, what would it cost to repair that? 1941 02:47:47,520 --> 02:47:53,080 Just one like this, two, 300,000 would be my guess. 1942 02:47:53,080 --> 02:47:55,940 We have a number of these smaller ones there, kind of on that order. 1943 02:47:56,340 --> 02:48:00,680 The larger ones, obviously, moving into the millions in construction costs, and then you 1944 02:48:00,680 --> 02:48:02,480 have all the supporting costs. 1945 02:48:03,060 --> 02:48:06,740 Also, that's probably a fair assessment of that, of a small site like that. 1946 02:48:11,610 --> 02:48:16,210 So we've talked about the number of sites that we've repaired in both of the programs. 1947 02:48:17,050 --> 02:48:22,010 Future work will be to continue to move through the inventory of those sites, DWRs, working 1948 02:48:22,010 --> 02:48:24,050 on the serious sites. 1949 02:48:24,050 --> 02:48:37,750 With repairing the sites we have identified with the existing funding that we have, we will continue to seek out funding to address the remaining balance of serious sites to be repaired under this program. 1950 02:48:38,530 --> 02:48:47,690 And of course the Army Corps of Engineers has plans and funding to complete all of their identified repairs by 2020 or 2021. 1951 02:48:47,690 --> 02:48:54,910 The LMAs, local maintaining agencies will continue to monitor, unrepared damage sites, implement 1952 02:48:54,910 --> 02:49:00,170 the contingency planning and follow-through with the flood operations center flood threat 1953 02:49:00,170 --> 02:49:02,030 mitigation process as needed. 1954 02:49:02,750 --> 02:49:08,070 We work closely with the districts for this program and other programs, so we have a good 1955 02:49:08,070 --> 02:49:14,470 line of connection communication with them, should problems arise with respect to the damages 1956 02:49:14,470 --> 02:49:20,050 from these storms and other storms, and other just standard levy repair issues. 1957 02:49:25,100 --> 02:49:29,420 So that wraps up what I was here to talk about today. 1958 02:49:30,080 --> 02:49:34,900 I just wanted to reiterate that we've had a lot of progress and success in the work that 1959 02:49:34,900 --> 02:49:35,920 we've done to date. 1960 02:49:36,060 --> 02:49:43,980 We still have more work to do, and as the system recovers from the storm, from the high water 1961 02:49:43,980 --> 02:49:51,040 events of last year in 2017, some of these more serious problems are being expressed, 1962 02:49:51,780 --> 02:49:56,340 seepage is something that is always kind of a difficult issue to address. 1963 02:49:56,880 --> 02:49:59,940 So there is future work definitely, specifically, I definitely... 1964 02:50:00,000 --> 02:50:09,060 We identified for the state, for these resulting from these storms, but just in general, too, as the system ages and new 1965 02:50:09,060 --> 02:50:17,400 high water events occur, it's kind of a ever-extending target of damages to be addressed. 1966 02:50:18,360 --> 02:50:19,700 Brian, did you have a question? 1967 02:50:21,240 --> 02:50:21,400 Okay. 1968 02:50:23,630 --> 02:50:24,250 Thank you. 1969 02:50:24,730 --> 02:50:28,410 For the 49 unfunded sites, did you say what the cost of those was? 1970 02:50:28,410 --> 02:50:39,390 We have an estimate of between 150 million to repair those with that kind of 1971 02:50:41,440 --> 02:50:41,800 construction 1972 02:50:41,800 --> 02:50:49,360 costs, mitigation, all the support, acquisitions, all those factors included. 1973 02:50:50,160 --> 02:50:55,240 And I imagine you have a prioritization within that range for those sites as well. 1974 02:50:58,360 --> 02:50:59,800 Thank you. 1975 02:51:00,300 --> 02:51:01,740 Anything else we're doing? 1976 02:51:02,540 --> 02:51:05,040 Thank you, David. That was a very complete report. 1977 02:51:06,140 --> 02:51:06,220 Thank you. 1978 02:51:06,660 --> 02:51:06,900 Thank you. 1979 02:51:07,820 --> 02:51:08,400 Thank you. 1980 02:51:10,700 --> 02:51:13,260 Well, members, my plan didn't work here. 1981 02:51:15,920 --> 02:51:17,460 So I think what we'll do. 1982 02:51:18,260 --> 02:51:19,160 President Edgar, okay. 1983 02:51:19,400 --> 02:51:20,480 We had a public comment. 1984 02:51:21,340 --> 02:51:21,480 Rick? 1985 02:51:22,400 --> 02:51:23,320 Thank you. Rick, Ryan Hart, 1986 02:51:23,380 --> 02:51:25,140 Amy Kangernears, on behalf of the Sunshine 1987 02:51:25,140 --> 02:51:26,260 Flight Control Association. 1988 02:51:26,560 --> 02:51:29,580 First, I want to thank the department for this repair program. 1989 02:51:29,580 --> 02:51:31,300 It's very appreciated by our members. 1990 02:51:31,960 --> 02:51:37,760 And I want to point out that while we didn't have a lot of members active in the PLD-499 1991 02:51:37,760 --> 02:51:43,860 program in 2017 through the FMAP program, to the partnership with the board, many of the 1992 02:51:43,860 --> 02:51:44,340 basins. 1993 02:51:44,500 --> 02:51:48,320 In fact, I think I'm a majority of the basins are now submitting their letters of intent 1994 02:51:48,320 --> 02:51:49,580 and getting active to the program. 1995 02:51:49,640 --> 02:51:54,600 So the next time that we have a high water event and we have damage that we'll be able to have 1996 02:51:54,600 --> 02:51:57,000 the Corps of Engineers more actively involved in these sites. 1997 02:51:58,440 --> 02:52:09,180 A concern I have with that is we've now listed all of our deficiencies through the good work of the board and the department with the 75 flood protection plan and documenting these storm damages. 1998 02:52:09,280 --> 02:52:17,040 We have a list of sites that have been damaged in 2017, 2019, and then we have sites that predate that are in our flood system repair program. 1999 02:52:17,880 --> 02:52:24,380 We heard Dave say that they need about 150 million to complete the repairs of the 2017 2000 02:52:24,380 --> 02:52:25,060 sites. 2001 02:52:25,700 --> 02:52:28,640 That's not in the Governor's budget for this year. 2002 02:52:29,600 --> 02:52:33,600 The bond language that is being put together doesn't have money that would be eligible 2003 02:52:33,600 --> 02:52:37,240 for those sites as they're currently proposed. 2004 02:52:38,960 --> 02:52:42,840 When we have another disaster and these districts are active, we're going to have a problem 2005 02:52:42,840 --> 02:52:48,360 of having listed the deficiencies and those sites getting worse and those events and negotiating 2006 02:52:48,360 --> 02:52:54,300 with the core, how much is the core willing to do of the correct, the new portion of the 2007 02:52:54,300 --> 02:52:54,420 damage. 2008 02:52:54,720 --> 02:52:58,760 So in 2021, if we have a high water event at these sites and we have a 500 foot erosion 2009 02:52:58,760 --> 02:53:04,720 site that becomes a thousand feet and we've become active in the program since 2017. 2010 02:53:04,800 --> 02:53:09,900 Now we've got to work with the core, how much are they going to do and how is the pre-existing 2011 02:53:09,900 --> 02:53:10,900 problem corrected? 2012 02:53:10,900 --> 02:53:17,660 And so getting the sites correct, corrected before the next high water event is the best thing we can do, and we need money to do that. 2013 02:53:17,880 --> 02:53:26,820 And so the flood control association gave a presentation on Wednesday to the legislative flood caucus advocating for 100 million annual appropriation. 2014 02:53:27,120 --> 02:53:32,380 And of that 100 million, we're saying 20 million specifically, go to storm danger parasites. 2015 02:53:32,740 --> 02:53:40,080 And so we just want to encourage both the board and the department to pursue funding for these repairs so we can get them done and we're prepared for the next disaster. 2016 02:53:40,080 --> 02:53:41,260 Thank you. 2017 02:53:41,360 --> 02:53:41,580 Thank you. 2018 02:53:44,820 --> 02:53:45,380 Melinda. 2019 02:53:47,440 --> 02:53:47,640 Okay. 2020 02:53:48,140 --> 02:53:49,580 Thank you. 2021 02:53:50,040 --> 02:53:50,280 Okay. 2022 02:53:51,120 --> 02:53:52,940 As I said, my plan didn't work here. 2023 02:53:53,580 --> 02:54:00,540 So I think what we'll do is use the new hour for the closed session. 2024 02:54:01,300 --> 02:54:06,680 Get that information out, come out as close to one, one, thirty as we can. 2025 02:54:06,680 --> 02:54:18,920 take up items 11B and 11C, which we've talked about before and we'll go fairly quickly and then 2026 02:54:18,920 --> 02:54:24,860 follow that up with the timed item and wrap up the agenda so be a little longer than 2027 02:54:24,860 --> 02:54:29,400 what I planned but at this point we'll recess to a close session. 2028 02:54:46,570 --> 02:54:46,850 Okay. 2029 02:54:48,270 --> 02:54:48,550 Okay. 2030 02:54:49,970 --> 02:54:50,570 Okay. 2031 02:55:27,630 --> 02:55:35,490 Conditional approval of the lower-alicorn-based and levy setback project today, permit number 19153. 2032 02:55:36,910 --> 02:55:47,350 And that is because the San Francisco division has approved the 408 and the Sacramento district is routing the letter as we speak, 2033 02:55:47,850 --> 02:55:51,030 and they're back checking the 100% plans on the 95% plans. 2034 02:55:51,850 --> 02:55:58,690 So, the Levy Setback project is going to construct approximately seven miles of Setback 2035 02:55:58,690 --> 02:56:03,870 Levy and the Yola Bypass, 1,500 to 1,800 feet, used to the truly canal in the lower 2036 02:56:03,870 --> 02:56:05,370 Alcorn Basin. 2037 02:56:08,390 --> 02:56:15,910 So, location map and Sacramento area is we all know and the project and the upper left, 2038 02:56:15,910 --> 02:56:25,890 The left schematic, the red is the existing levy, and then the yellow is the new proposed setback levy. 2039 02:56:27,490 --> 02:56:33,170 So it's going to widen the sacrament on bypass, approximately 1,500 feet to the north. 2040 02:56:34,330 --> 02:56:40,670 I'm going to degrade 80% of the YOLA bypass east levee, leaving approximately 500 foot-long 2041 02:56:40,670 --> 02:56:46,010 segments for upland habitat about every 2,000 feet, and the existing sacrament on bypass 2042 02:56:46,010 --> 02:56:48,050 north levee will also be degraded. 2043 02:56:49,790 --> 02:56:56,350 It's going to improve the lower alcohol and basin interior drainage system to facilitate discharge 2044 02:56:56,350 --> 02:57:02,610 of precipitation volumes up to the 100 year flood event, and it's going to implement ecosystem 2045 02:57:02,610 --> 02:57:08,330 improvements in the Alcorn Basin mitigate project impacts, which will provide multiple 2046 02:57:09,750 --> 02:57:12,950 many ecosystem benefits to the surrounding areas. 2047 02:57:15,680 --> 02:57:21,460 So what's actually going to be included in the permit, what the board is going to be permitting, 2048 02:57:22,180 --> 02:57:28,100 is the construction of the setback levee in the YOLBYPAS placement of discharge pipes associated 2049 02:57:28,100 --> 02:57:36,580 with the new pump station, degrading about 80% to the yellow bi-passi-sleve degradation of the existing 2050 02:57:36,580 --> 02:57:43,420 segment on bypass north-leve implementing implementation of ecosystem improvements in the lower 2051 02:57:43,420 --> 02:57:49,500 alcohol and basin, and the relocation of the existing AT&T fiber lines. 2052 02:57:52,670 --> 02:57:53,910 So the hydraulic analysis, 2053 02:57:53,910 --> 02:58:03,970 This is a pretty robust levy, levy heights were determined by the 100-year design water 2054 02:58:03,970 --> 02:58:11,030 service elevation, plus six feet of free board, and in plus an additional foot to account 2055 02:58:11,030 --> 02:58:14,630 for potential future climate change and adaptation. 2056 02:58:15,930 --> 02:58:21,910 State rejections occur in the all bypass downstream of the free-mought wear as well as 2057 02:58:21,910 --> 02:58:28,830 and the stage reductions go all the way down to where the yellow bypass meets up with the 2058 02:58:28,830 --> 02:58:30,670 confluence of the circumvent on bypass. 2059 02:58:33,860 --> 02:58:37,300 So the overall stages in yellow bypass will be reduced 2060 02:58:37,300 --> 02:58:43,820 by approximately nine miles from the areas I just explained. And then staff has reviewed the 2061 02:58:43,820 --> 02:58:52,940 H&H information provided by DWR and their 100% design plans. And expect no adverse hydraulic 2062 02:58:52,940 --> 02:58:59,360 impact to the Sacramento River flood control project levees and the levee is compliant with our 2063 02:58:59,360 --> 02:59:01,620 tele-23 standards. 2064 02:59:04,460 --> 02:59:06,160 So the geotechnical analysis, 2065 02:59:08,380 --> 02:59:12,020 see the levees was over-designed with water 2066 02:59:12,020 --> 02:59:20,620 crown and flatter slopes to mitigate for fat clays and soils with liquid limits over 50 and those 2067 02:59:20,620 --> 02:59:25,000 flutter slopes, or there's four to one slopes on both sides, both the water side in the 2068 02:59:25,000 --> 02:59:32,040 land side. The flutter slopes will improve stability, allowing the use of locally sourced 2069 02:59:32,040 --> 02:59:37,580 barlementary that have higher liquid limits and plasticity indexes. 2070 02:59:39,840 --> 02:59:42,220 So, the also for geo-tapped 2071 02:59:42,220 --> 02:59:47,420 the setback-level foundation area will be over-execrated by three feet to replace an engineered 2072 02:59:47,420 --> 02:59:50,960 fill. The bottom of the over excavation would be 2073 02:59:50,960 --> 02:59:53,340 scarified in additional eight inches and 2074 02:59:53,340 --> 02:59:56,060 re-compacted part of placement of fill. 2075 02:59:56,920 --> 02:59:59,940 And like I said, the levy crown is going to be 28C. 2076 03:00:00,000 --> 03:00:11,800 And so far, I'm not sure why, instead of the typical 20 feet, to provide resiliency against potential seasonal shrinkage cracking, and potential slope creek along the levy. 2077 03:00:13,220 --> 03:00:18,140 And there's going to be a maintenance run on top as well. 2078 03:00:20,680 --> 03:00:31,960 So after reviewing the geo-tech analysis and plans and specs, the Board staff has determined that the proposed project is compliant with tele-23 and no potential adverse 2079 03:00:31,960 --> 03:00:33,580 geotechnical impacts. 2080 03:00:36,640 --> 03:00:41,020 So the real estate requirements, as you know, we've had some resolutions and 2081 03:00:41,020 --> 03:00:43,180 necessity that passed a couple of months on this project. 2082 03:00:44,520 --> 03:00:48,360 And the lower-all-corn-based and levy setback project will require acquisition of 2083 03:00:48,360 --> 03:00:54,540 approximately 2,100 acres of real estate, containing over 23 parcels and 9 landowners. 2084 03:00:55,880 --> 03:01:01,720 And as a February, the department has acquired one parcel of approximately 67 acres, and 2085 03:01:01,720 --> 03:01:08,780 is concluding negotiations for two other parcels and acquisitions are ongoing as we speak 2086 03:01:08,780 --> 03:01:09,460 on the others. 2087 03:01:13,960 --> 03:01:19,680 So our staff recommendation is for the board to adopt the SQL findings, 2088 03:01:24,210 --> 03:01:24,690 conditionally 2089 03:01:24,690 --> 03:01:31,150 approved, permit 19153, and substantially the form provided, pending the section for a way 2090 03:01:31,150 --> 03:01:37,990 approval from the Sacramento District, Army Corps of Engineers, and direct executive officer 2091 03:01:37,990 --> 03:01:43,090 to take necessary actions to execute the permit and follow the notice of determination 2092 03:01:43,090 --> 03:01:44,730 pursuant to sequela. 2093 03:01:47,110 --> 03:01:47,410 Okay. 2094 03:01:47,510 --> 03:01:48,570 Questions for the Board? 2095 03:01:50,410 --> 03:01:50,970 Excuse me. 2096 03:01:52,290 --> 03:01:53,950 I don't have a comment. 2097 03:01:55,890 --> 03:02:02,070 I think when you say the geographically, the levees were over-designed, I don't think you 2098 03:02:02,070 --> 03:02:12,490 I think you meant to say they were appropriately designed to a greater standard because of the soil conditions that existed that site. 2099 03:02:12,870 --> 03:02:15,310 We're not over designing the levy correct. 2100 03:02:17,020 --> 03:02:19,520 I'd venture to say what you said is correct. 2101 03:02:33,600 --> 03:02:34,660 Okay, any other comments? 2102 03:02:36,200 --> 03:02:37,820 Okay, what's the pleasure of the board? 2103 03:02:41,730 --> 03:02:52,670 move by, uh, from here, second by, uh, but no, Brian Johnson. Any comments from the public on this item? 2104 03:02:54,670 --> 03:02:57,690 Okay, uh, bring it back to the board on favor. 2105 03:03:00,020 --> 03:03:04,620 Post, okay, motion crews. Let's go to, uh, item 11c. 2106 03:03:05,000 --> 03:03:10,040 Greg, this is your item. Yes, this is the goldfield setback, Evan. 2107 03:03:45,720 --> 03:03:47,180 All right. Good afternoon again. 2108 03:03:47,180 --> 03:04:02,160 It was Greg Harvey, chief of the planned implementation and compliance branch, and today we're going to be asking for approval of the setback levy for the 200 year goldfields project. 2109 03:04:03,280 --> 03:04:12,320 So, this back levy is, see, permanent number 19463, it's going to construct approximately 2110 03:04:12,320 --> 03:04:19,740 2.6 miles of extension beginning at the upper terminus of the U.B. Reversal Levy. The new 2111 03:04:19,740 --> 03:04:24,760 levy will extend the current federal levy system to high ground and provide 200-year protection 2112 03:04:24,760 --> 03:04:32,420 for Linda, Linda, all of her stem, Plumus Lake, the project will tie in to the two and 2113 03:04:32,420 --> 03:04:36,820 degraded portion of the existing Uberiber South levy that is currently part of the state 2114 03:04:36,820 --> 03:04:37,740 plan of flood control. 2115 03:04:39,980 --> 03:04:44,980 So this project was authorized by the Water Resources Development Act 2116 03:04:44,980 --> 03:04:52,300 of 2018. The Army Corps has provided a memo stating that Section 408 permission is not required 2117 03:04:52,300 --> 03:04:59,460 for this Congressional Authorized Project and an amendment to the 1953 memorandum of 2118 03:04:59,460 --> 03:04:59,940 There's Danny. 2119 03:05:00,000 --> 03:05:05,860 Between the Army Corps and the Center of the Life of Protection Board, we'll be required to include the new 2120 03:05:05,860 --> 03:05:08,720 levy into the Sacramento Reflect Control Project. 2121 03:05:11,740 --> 03:05:15,640 So here's a location map of the levy, the new extension 2122 03:05:15,640 --> 03:05:19,000 levy is in the upper right, designated in yellow. 2123 03:05:22,350 --> 03:05:28,030 And this is a schematic of the levy. See, the whole 2124 03:05:28,030 --> 03:05:33,430 thing is the levy, but the green areas have cut off wall in them. 2125 03:05:33,690 --> 03:05:37,450 And then the partially puttin' at the end on the right is, doesn't have a cut off 2126 03:05:37,450 --> 03:05:38,670 all is just the regular levy. 2127 03:05:39,450 --> 03:05:44,930 And then the blue up where we up where it ties in to the existing state plan of flood control, 2128 03:05:45,230 --> 03:05:49,650 there's a seapage burn up there, and then there's going to be a little degrading of the 2129 03:05:49,650 --> 03:05:50,970 existing levy to tie in. 2130 03:05:54,260 --> 03:06:00,120 So this project, the levy embankment, is approximately 2.6 miles long, ranging in high 2131 03:06:00,120 --> 03:06:02,040 from 2 to 17 feet. 2132 03:06:03,320 --> 03:06:06,720 Seepers cut off wall for approximately two miles of that, 2133 03:06:06,900 --> 03:06:10,960 and landslide berm at the tie-in of the new levy, 2134 03:06:11,680 --> 03:06:14,280 to the existing U-brother South levy. 2135 03:06:14,900 --> 03:06:18,780 There'll be five levy access ramps on this new levy, 2136 03:06:19,460 --> 03:06:23,140 and in all weather patrol road on the levy crown, 2137 03:06:23,160 --> 03:06:25,820 and continuously landslide tow access road as well. 2138 03:06:27,390 --> 03:06:38,170 So there will be three, 36-inch gravity outfall pipes through the degraded remnant portion of the uber of our south-levy, that's up north near the tyin. 2139 03:06:39,810 --> 03:06:48,850 And the Profi water district irrigation canal, levied penetration box, covert, relocated canal, also go through. 2140 03:06:48,850 --> 03:06:54,090 There'll be three water side detention basins designed to store the 100 year interior drainage 2141 03:06:54,090 --> 03:06:56,930 events and that was located. 2142 03:06:58,210 --> 03:07:09,830 That was the blue shaded areas in this schematic and let's see the detention base in 2143 03:07:09,830 --> 03:07:10,650 a levy penetration. 2144 03:07:11,150 --> 03:07:15,970 There's going to be a 36 inch gravity outfall pipe through there and then up where it ties 2145 03:07:15,970 --> 03:07:21,310 in that we're going to be degrading 1,000 feet of the upstream end of the U. 2146 03:07:21,430 --> 03:07:22,230 River South Levy. 2147 03:07:25,170 --> 03:07:29,470 So hydraulic analysis proposed levy heights were determined using 2148 03:07:29,470 --> 03:07:35,970 an design water surface elevation, developed using the criteria in the Department of 2149 03:07:35,970 --> 03:07:41,510 Water Resources Urban Levy design criteria, federal emergency management agency criteria 2150 03:07:41,510 --> 03:07:44,370 and the Army Corps of Deterministic Approach for Freeboard. 2151 03:07:45,310 --> 03:07:59,310 Trilias Hydraulic Impact Analysis concluded that the proposed project will have no impact to maximize water service elevations along the Uber River North and South heavies and changes in flow will be less than significant. 2152 03:08:02,350 --> 03:08:15,890 So Board staff has reviewed the Hydraulic Hydrology and Hydraulic Analysis and on the 100% design plans and determined that the proposed project is expected to result in no adverse hydraulic impacts to the 2153 03:08:15,890 --> 03:08:21,950 second order flood control project levies and it is compliant with our title 23 standards 2154 03:08:24,640 --> 03:08:32,380 Geotech analysis trillion provided geotech report which included project design criteria a description of 2155 03:08:32,960 --> 03:08:39,800 Existing geotech and go conditions and geotech and go analysis to show that the project meets levy safety criteria 2156 03:08:39,800 --> 03:08:42,400 Established by the Army Corps levy design criteria 2157 03:08:43,560 --> 03:08:46,920 DWR's urban levy design criteria and our title 23 2158 03:08:46,920 --> 03:08:51,460 The reporting-analyzed subservous conditions, seismic vulnerability, 2159 03:08:52,240 --> 03:08:58,840 sea-page, substability, and settlement, and board staff has determined that there 2160 03:08:58,840 --> 03:09:03,420 are no anticipated adverse geotechnical impacts. 2161 03:09:06,260 --> 03:09:11,720 So, real estate requirements, Julia is acquiring the necessary real estate rights to 2162 03:09:11,720 --> 03:09:17,100 provide access and control needs for construction, operation, and maintenance of the project. 2163 03:09:17,100 --> 03:09:25,100 The project footprint will require approximately 100 acres of fee acquisition, including several rural residential properties, 2164 03:09:26,440 --> 03:09:34,340 and several hundred acres between the Uba River and the New Levy are being acquired, and most of those are owned by a mining company. 2165 03:09:37,840 --> 03:09:44,760 So, flowage easements, flowage easements are not being pursued by Trialia for the area between the Uba River and the proposed Levy. 2166 03:09:44,760 --> 03:09:53,080 The proposed levee is more than a mile, 1.2 and further in some places from the Yuba River 2167 03:09:53,080 --> 03:09:55,800 with a large high ground area in between. 2168 03:09:56,380 --> 03:10:00,000 The properties on the water side of the new levee will continue to have 100 year protection. 2169 03:10:00,000 --> 03:10:11,160 And in the 200-year event, the proposal will not result in an increase in flood damage beyond what the property is currently experienced from increased groundwater levels during an event. 2170 03:10:14,520 --> 03:10:20,720 So this is a schematic of the project, the proposed levies in the magenta at the bottom. 2171 03:10:21,500 --> 03:10:25,940 And you've got goldfields up to the north, and the U.B. River up north, 2172 03:10:27,960 --> 03:10:30,240 and it's very similar 2173 03:10:30,240 --> 03:10:41,500 schematic showing future water mining ponds, and then this is what's proposed, we've got 2174 03:10:41,500 --> 03:10:48,280 some proposed mining in that area on the existing high ground, which has 100-year protection. 2175 03:10:51,480 --> 03:10:57,070 So staff would recommend that the board adopt the 2176 03:10:57,070 --> 03:11:02,620 SQL findings for this project and approve 2177 03:11:02,620 --> 03:11:05,900 encroach from permit 1 9463 and substantially 2178 03:11:05,900 --> 03:11:09,720 to form provided and direct the executive officer to 2179 03:11:09,720 --> 03:11:12,640 take necessary actions to execute the permit and file 2180 03:11:12,640 --> 03:11:13,800 the notice of determination. 2181 03:11:15,000 --> 03:11:16,360 Thank you, Greg. 2182 03:11:17,160 --> 03:11:18,360 Any questions for the board? 2183 03:11:20,840 --> 03:11:22,000 Questions for the public? 2184 03:11:24,620 --> 03:11:25,920 Okay, I'll bring it back to the board. 2185 03:11:25,920 --> 03:11:27,300 Let's pleasure the board. 2186 03:11:29,440 --> 03:11:35,800 Move by Ramirez, seconded by, oh, Joe, OK. 2187 03:11:39,020 --> 03:11:41,420 All in favor, posed. 2188 03:11:42,460 --> 03:11:43,600 OK, thank you. 2189 03:11:44,560 --> 03:11:45,460 Thank you, Greg. 2190 03:11:46,520 --> 03:11:50,040 We'll go back to item 11A. 2191 03:11:50,060 --> 03:11:51,140 Joe, just real fast. 2192 03:11:51,840 --> 03:11:54,740 OK, I just have a moment to pause and just think 2193 03:11:54,740 --> 03:11:56,000 the last few things that happened. 2194 03:11:57,560 --> 03:11:59,660 These are like years in the making, right? 2195 03:11:59,660 --> 03:12:00,340 Oh, sure. 2196 03:12:00,520 --> 03:12:01,380 And it's lots to work. 2197 03:12:01,500 --> 03:12:05,840 And it took a lot to get to what was amount of five minutes for you to present that grade. 2198 03:12:06,140 --> 03:12:07,140 So that was great. 2199 03:12:07,860 --> 03:12:12,720 But I think it's worth just recognizing the years of investment from a lot of people. 2200 03:12:12,980 --> 03:12:14,440 And these are the kind of things you want to have happen. 2201 03:12:15,700 --> 03:12:20,240 So big thanks to the people that worked on this for years, decades, in some cases probably. 2202 03:12:21,100 --> 03:12:23,900 It's a really great thing to see come to this point. 2203 03:12:24,780 --> 03:12:28,040 And we didn't see much time talking about it today, but that's because there was so much 2204 03:12:28,040 --> 03:12:29,480 going to work done for a very long time. 2205 03:12:29,480 --> 03:12:31,520 So good to be you guys, both projects. 2206 03:12:32,160 --> 03:12:34,660 Tim, yeah, to that point, the lower L-Core and crew, 2207 03:12:34,800 --> 03:12:37,300 they had all their geotech, their hydro people here, 2208 03:12:37,380 --> 03:12:39,440 their real estate people here, they've been working on it 2209 03:12:39,440 --> 03:12:40,440 for a long time. 2210 03:12:40,720 --> 03:12:45,660 And then also Paul Brunner and Trilia, DWR, 2211 03:12:45,780 --> 03:12:47,540 they were all here, ready to answer any questions, 2212 03:12:48,020 --> 03:12:48,700 but went pretty smooth. 2213 03:12:49,300 --> 03:12:50,100 Thank you, everybody. 2214 03:12:52,100 --> 03:12:55,760 Yeah, thanks Tim for recognizing 2215 03:12:55,760 --> 03:12:58,840 we have to celebrate our successes every once in a while. 2216 03:12:58,840 --> 03:13:00,080 Thank you. 2217 03:13:04,270 --> 03:13:20,390 Okay, we're back to our time item 11A and this is an enforcement action and the board is being asked to approve the staff recommendation 2218 03:13:20,390 --> 03:13:31,210 on which are to one adoptive proposed enforcement order order as a respondent to secure the 2219 03:13:31,210 --> 03:13:37,270 water side levy berm by March 20th. We have prevent further erosion direct the staff 2220 03:13:37,270 --> 03:13:46,110 to record the order. We vote three previously issued encroachments permits for the encroachments 2221 03:13:46,110 --> 03:13:53,210 that no longer exist, and imposes an administrative penalty of $106,000 based upon the factors 2222 03:13:53,790 --> 03:13:56,090 set forth in the water code. 2223 03:13:58,310 --> 03:14:02,750 Now, gee, are you going to want to swear in these folks or not? 2224 03:14:06,280 --> 03:14:06,640 I am. 2225 03:14:06,680 --> 03:14:07,600 Thank you, Mr. President. 2226 03:14:08,580 --> 03:14:16,460 I would ask all persons who intend to testify today, please stand up and raise your right 2227 03:14:16,460 --> 03:14:16,940 hand. 2228 03:14:16,940 --> 03:14:18,800 So, I can ensure the oath. 2229 03:14:26,230 --> 03:14:26,930 Thank you. 2230 03:14:28,720 --> 03:14:31,660 Do you affirm to tell the truth, the whole truth, and nothing but the truth? 2231 03:14:31,740 --> 03:14:34,900 And these proceedings before this administrative body? 2232 03:14:36,960 --> 03:14:37,320 Thank you. 2233 03:14:37,640 --> 03:14:40,220 I would also ask any time you come up before, 2234 03:14:40,220 --> 03:14:43,960 of the initially before you come up to speak to the board, 2235 03:14:44,260 --> 03:14:47,760 confirm or I will also ask that you confirm that you have taken the oath, 2236 03:14:47,820 --> 03:14:48,820 so it's clear for the record. 2237 03:14:49,420 --> 03:14:52,440 So, please allow me to do that prior to you speaking. 2238 03:14:52,820 --> 03:14:53,540 Thank you. 2239 03:14:55,490 --> 03:14:56,170 Thank you. 2240 03:14:56,170 --> 03:14:59,930 gee, this is the way I'd like to personally. 2241 03:15:00,000 --> 03:15:11,160 Seed, presentation of the staff report, which I guess is going to be orchestrated by Sarah, questions from the board. 2242 03:15:12,600 --> 03:15:23,840 And then have Mr. Meyer, who is representative, present their case. We have a staff response to their rebuttal, so to speak. 2243 03:15:23,840 --> 03:15:26,660 We'll have questions from the board. 2244 03:15:28,180 --> 03:15:30,120 I'll ask for comments from the public. 2245 03:15:31,620 --> 03:15:33,920 Final comments from Mr. Meyer. 2246 03:15:34,560 --> 03:15:36,560 Final comments from the staff. 2247 03:15:37,040 --> 03:15:39,400 And then I'll bring it back to the board for a decision. 2248 03:15:42,140 --> 03:15:43,960 Everybody okay with that? 2249 03:15:44,900 --> 03:15:47,660 Okay. Yes, acceptable to ask Mr. President. 2250 03:15:48,600 --> 03:15:50,200 Okay. Sarah, you're up. 2251 03:15:50,360 --> 03:15:52,900 All right. Good afternoon. President Eggher. 2252 03:15:52,900 --> 03:15:54,820 Vice President Dolan members of the board. 2253 03:15:54,820 --> 03:15:59,700 My name is Sarah Bakas. I am staff counsel for the Central Valley Flood Protection Board. 2254 03:16:00,160 --> 03:16:04,540 Board enforcement staff is before you to request that you issue. 2255 03:16:05,100 --> 03:16:10,020 The proposed enforcement order against the LeMIR irrevocable trust LeMIR respondent 2256 03:16:10,380 --> 03:16:14,180 for violations that have occurred in our occurring at 79-07 2257 03:16:14,180 --> 03:16:16,200 Garden Highway Sacramento, California. 2258 03:16:17,340 --> 03:16:20,560 The enforcement section engineer assigned to this matter as John Tyson, 2259 03:16:20,560 --> 03:16:25,500 and he'll be explaining the technical aspects of the violations and the history of the enforcement 2260 03:16:25,500 --> 03:16:26,760 action to you. 2261 03:16:27,300 --> 03:16:31,500 You will remember that this matter came before you for affirmation of the cease and 2262 03:16:31,500 --> 03:16:35,200 the cease dorter on November 22nd, 2019. 2263 03:16:36,300 --> 03:16:41,960 The cease and the cease dorter required that Mr. Meyer comply with its terms by December 23rd, 2264 03:16:42,000 --> 03:16:47,760 2019 at this point Mr. Meyer has completely failed to comply with any of the terms 2265 03:16:47,760 --> 03:16:55,260 of the season to sister and the property is in the same or worse condition than it was at that time. 2266 03:16:55,580 --> 03:17:02,920 So just for some background on this hearing, the purpose is to consider the issuance of an enforcement order. 2267 03:17:03,860 --> 03:17:06,880 The staffs requested enforcement order is in your packets. 2268 03:17:07,780 --> 03:17:16,220 According to the water code, the board may approve a man or reject the proposed enforcement order and take any of the following actions. 2269 03:17:16,220 --> 03:17:20,680 You may order removal, modification, or abatement of the encroachment. 2270 03:17:21,020 --> 03:17:25,060 You may order restoration of the site, excuse me. 2271 03:17:25,220 --> 03:17:27,220 You may impose administrative penalties. 2272 03:17:28,560 --> 03:17:32,560 You may order that the enforcement order be recorded with the county. 2273 03:17:33,540 --> 03:17:38,700 You may initiate a civil action in the name of the state, and you may order any other 2274 03:17:38,700 --> 03:17:44,320 action or condition that the board considers to be proper to resolve the violation. 2275 03:17:44,320 --> 03:17:50,780 and just to note that we are not requesting it this time that the Board initiated a civil 2276 03:17:50,780 --> 03:17:51,420 action. 2277 03:17:53,840 --> 03:17:58,260 And this hearing would be conducted in the same manner as a normal hearing before 2278 03:17:58,260 --> 03:18:02,240 the Board and technical rules of evidence would not be applied. 2279 03:18:04,280 --> 03:18:07,060 So at this time, unless you 2280 03:18:07,060 --> 03:18:11,960 I don't have any questions of me board members, I'll turn it over to John. 2281 03:18:13,620 --> 03:18:14,000 No questions? 2282 03:18:14,880 --> 03:18:15,140 All right. 2283 03:18:19,970 --> 03:18:20,830 That's for me, John. 2284 03:18:21,290 --> 03:18:22,430 I have to do in President Eiger. 2285 03:18:22,530 --> 03:18:23,670 My name is John Tyson. 2286 03:18:24,450 --> 03:18:26,910 I have to take in the oath. 2287 03:18:28,030 --> 03:18:28,470 You're welcome. 2288 03:18:29,730 --> 03:18:31,010 If you'd have to do in President Eiger. 2289 03:18:31,130 --> 03:18:32,290 Vice President Dolan. 2290 03:18:32,610 --> 03:18:33,850 Other members of the board. 2291 03:18:34,370 --> 03:18:35,010 Mr. Meyer. 2292 03:18:35,410 --> 03:18:36,150 Members of the public. 2293 03:18:36,830 --> 03:18:37,950 Again, I'm John Tyson. 2294 03:18:37,950 --> 03:18:43,130 with the Central Valley Club Protection Board Enforcement Section, and we're here to discuss 2295 03:18:43,130 --> 03:18:51,110 the enforcement case number 2017-15464 public hearing for the enforcement order against 2296 03:18:51,110 --> 03:18:53,130 the entire irrevocable trust. 2297 03:18:54,080 --> 03:19:01,250 We have proposed board action before you this afternoon, and this slide here is a summary 2298 03:19:01,250 --> 03:19:06,450 of board staff's recommendations which will be discussed in more detail at the end of this 2299 03:19:09,300 --> 03:19:14,480 So a proposed board action before you is to adopt an enforcement order for the 2300 03:19:14,480 --> 03:19:19,700 respondent that one finds the respondent violated several flood control 2301 03:19:19,700 --> 03:19:23,780 statutes in the California water code and title 23 of the California 2302 03:19:23,780 --> 03:19:29,340 code of regulations. The details of the California code of water code and 2303 03:19:29,340 --> 03:19:33,680 title 23 statute violations can be found in the staff report within the 2304 03:19:33,680 --> 03:19:36,740 one of the violation and seasons assist order attachments. 2305 03:19:38,560 --> 03:19:42,820 The second thing is we find the respondent responsible and liable for the repair of the water 2306 03:19:42,820 --> 03:19:44,680 side-leavy berm and other violations. 2307 03:19:46,020 --> 03:19:51,340 The third order is the respondent to secure the water side-leavy berm for certain the title 23 2308 03:19:51,340 --> 03:19:53,700 to prevent further water-side berm erosion. 2309 03:19:55,160 --> 03:19:59,720 4th item is to revoke permits no. 1, 2, 5, 3, 5, Dashe. 2310 03:20:00,000 --> 03:20:07,560 1, 3, 5, 3, 1, and 1, 4, 5, 3, that were previously issued for this location. 2311 03:20:08,600 --> 03:20:15,700 These permits are recommended to be revoked, because the encroachments do not physically exist now. 2312 03:20:15,700 --> 03:20:21,000 And five, imposes a administrative penalty in the amount of $106,000. 2313 03:20:21,720 --> 03:20:27,060 The administrative penalty is based on California water code section 80704, 2314 03:20:27,520 --> 03:20:33,160 and the details of the penalty are noted on page 12 of the staff report and at the end of this presentation. 2315 03:20:35,590 --> 03:20:43,890 The violations are located north of the interstate 5, south of West El Verde Road, on the waterside 2316 03:20:43,890 --> 03:20:50,730 berm of the left bank Sacramento River Levy, at 79-07 Garden Highway, approximately one 2317 03:20:50,730 --> 03:20:53,250 mile, northwest of the Sacramento Airport. 2318 03:20:55,400 --> 03:21:01,220 Here's a close-up aerial view of where the violations are located, the Sacramento River 2319 03:21:01,220 --> 03:21:06,620 is to the west of the property, the Sacramento River left bank Levy is to the east of 2320 03:21:09,110 --> 03:21:21,950 There's a short snippet of all the applicable laws of regulations that are in detail, noted in the staff report, specifically within notice of violation and cease and cease and 2321 03:21:21,950 --> 03:21:23,210 disist order attachments. 2322 03:21:24,090 --> 03:21:28,310 These can be gone over in detail of the board's so desires. 2323 03:21:29,390 --> 03:21:36,090 Please note there are a total of 16 violations of Title 23 and board encroachment permit conditions. 2324 03:21:36,090 --> 03:21:40,350 only two of these violations have been remedied at this time. 2325 03:21:42,970 --> 03:21:46,390 We do have an easement here. 2326 03:21:47,050 --> 03:21:52,310 The California, the Central Valley Public Protection Board, through the Sacramento and 2327 03:21:52,310 --> 03:21:57,370 San Joaquin drainage district, has a joint use agreement with and easement with reclamation 2328 03:21:57,370 --> 03:21:58,750 district 1,000. 2329 03:21:58,910 --> 03:22:03,610 That covers the entire property where the violations occurred, including the garden highway. 2330 03:22:03,610 --> 03:22:13,270 This map is from the DWR Division of Engineering Geodetic Branch and is noted as Exhibit B in the Staff Report. 2331 03:22:16,580 --> 03:22:18,100 Now we're going to go over the background. 2332 03:22:20,900 --> 03:22:25,260 In June 2009, Ms. Peggy and Mr. Chen Xiang purchased the property. 2333 03:22:26,860 --> 03:22:34,580 In January 13, 2011, Reclamation District 1,000 Staff was made aware of water side bank subsidence by Mr. Chen. 2334 03:22:35,740 --> 03:22:42,080 R-D-1,000 staff advised you in June to obtain the services of a California registered professional civil 2335 03:22:42,080 --> 03:22:45,740 engineer to develop a plan and address the subsidence. 2336 03:22:46,100 --> 03:22:49,680 However, no such plan was ever submitted to R-D-1,000 or the board. 2337 03:22:50,940 --> 03:22:54,960 If you could look at the picture on the left, you can see where the subsidence is and we 2338 03:22:54,960 --> 03:22:59,080 made a reference point for the steps of the picture on the left. 2339 03:22:59,080 --> 03:23:03,680 So, those pictures have approximately six years 2340 03:23:03,680 --> 03:23:05,680 difference between that. 2341 03:23:05,780 --> 03:23:07,900 It should be noted at the Waterside 2342 03:23:07,900 --> 03:23:10,620 Burm at this location consists of sandy soils. 2343 03:23:14,180 --> 03:23:18,000 On January 4, 2018 board and already 1,000 staff, 2344 03:23:18,180 --> 03:23:20,920 along with other local public agency representatives, 2345 03:23:21,760 --> 03:23:24,200 visited the site to further assess the Waterside 2346 03:23:24,200 --> 03:23:27,440 Baker Ocean and discuss issues with Miss Hew. 2347 03:23:27,880 --> 03:23:30,640 Miss Hew was advised by Board staff to investigate 2348 03:23:30,640 --> 03:23:34,120 into an engineered solution to save for property at that time. 2349 03:23:35,360 --> 03:23:42,500 On March 6, 2018 Board Staff issued a notice of violation and OVE to Mr. Chiang, who received it 2350 03:23:42,500 --> 03:23:50,260 on March 10, 2018. On April 17, 2018 Board Staff received a written response to the NOV from 2351 03:23:50,260 --> 03:23:55,900 Ms. Yves Attorney, Mr. Brian Manning, which included a request for more information and more 2352 03:23:55,900 --> 03:24:00,700 to respond, however his response did not address the NOV corrective actions. 2353 03:24:01,640 --> 03:24:08,140 On May 11, May 11, 2018, Board staff conducted a water-side inspection of the property 2354 03:24:08,140 --> 03:24:11,820 to determine the extent of the observed water-side burn erosion. 2355 03:24:13,360 --> 03:24:20,940 And here we have a photograph from the water, where we observe the erosion occurred in the 2356 03:24:20,940 --> 03:24:23,380 water-side burn area behind the dwelling. 2357 03:24:24,660 --> 03:24:30,780 There's a picture of the property to the north, where we found it had not experienced erosion. 2358 03:24:31,540 --> 03:24:40,760 The property line between the property to the north and 7907 is approximately where that large clump of trees are with the telephone pole sticking out through the top. 2359 03:24:43,780 --> 03:24:48,760 The south end of 7907 Garden Highway only experienced minor erosion. 2360 03:24:49,640 --> 03:24:51,500 That's what we saw from the water. 2361 03:24:53,060 --> 03:24:59,940 So, on June 11, 2018, Board staff provided the information requested by Mr. Manning in his April. 2362 03:25:00,000 --> 03:25:08,980 17, 2018, N.O.V. response letter. On June 22, 2018, Board staff received a public records act request for 2363 03:25:08,980 --> 03:25:15,180 Mr. Manning, asking for all documents related to 79,07, Garden Highway. Board staff provided 2364 03:25:15,180 --> 03:25:25,200 the requested information to Mr. Manning on July 9, 2018. On February 22, 2019, Board staff 2365 03:25:25,200 --> 03:25:30,560 sent the letter to Miss Yi and Mr. Manning and forming them due to their lack of response to 2366 03:25:30,560 --> 03:25:36,180 the NOV, even after all the additional request and information was provided, and by default 2367 03:25:36,180 --> 03:25:41,540 had received more time to respond that the board would be moving forward with this as a 2368 03:25:41,540 --> 03:25:42,560 forcement process. 2369 03:25:45,690 --> 03:25:51,010 On June 12, 2019, Board staff had the phone conversation with the respondent, 2370 03:25:51,270 --> 03:25:56,610 regarding the NOV because he had received a copy of it from Miss Yi, and had questions about 2371 03:25:56,610 --> 03:26:02,010 corrective actions and title 23 compliance requirements if he purchased the property. 2372 03:26:02,710 --> 03:26:09,630 On June 14, Board staff sent an email to the responded documenting this June 12th conversation. 2373 03:26:10,890 --> 03:26:16,770 On July 16, 2019, Board staff met with the respondent at the Board's operations as branch office 2374 03:26:16,770 --> 03:26:20,790 and provided him with a hard copy of both the NB and title 23. 2375 03:26:20,790 --> 03:26:26,350 I mean, the respondent was informed if he purchased the property, he would have to comply 2376 03:26:26,350 --> 03:26:31,850 with the NOV and all of its corrective actions, which included a this middle of a stabilization 2377 03:26:31,850 --> 03:26:37,530 plan, prepared by a California licensed civil engineer to address the water side bank 2378 03:26:37,530 --> 03:26:40,110 erosion and other non-compliant encroachments. 2379 03:26:42,490 --> 03:26:47,970 On September 14, 2019, the respondent notified Board staff he had purchased the property. 2380 03:26:47,970 --> 03:26:52,770 He had also provided board staff with a copy of the grant deed on the same day. 2381 03:26:53,670 --> 03:27:04,590 Three days later on September 17, board staff notified the respondent via email that he needed to provide response to the NOB by October 7, 2019. 2382 03:27:05,770 --> 03:27:13,910 Since board staff had talked and met with the respondent about complying with the NOB corrective actions and Title 23 prior to his purchase of the property, 2383 03:27:13,910 --> 03:27:18,890 It was determined a three week notice of violation response timeframe would be appropriate. 2384 03:27:19,910 --> 03:27:26,750 On October 7, 2019, the respondent did submit a document titled Stabilization Plan 2385 03:27:26,750 --> 03:27:28,770 Dash Compliance to Board Staff. 2386 03:27:29,210 --> 03:27:30,930 We started calling it the plan. 2387 03:27:32,330 --> 03:27:37,410 On October 11, 2019, Board Staff notified the respondent that his submitted plan was received 2388 03:27:37,410 --> 03:27:41,270 that the plan did not comply with the notice of violation because it did not include 2389 03:27:41,270 --> 03:27:46,770 the stabilization plan with design documents and a project schedule prepared by a registered 2390 03:27:46,770 --> 03:27:51,390 California Professional Engineer and that board staff would be moving forward with its 2391 03:27:51,390 --> 03:27:52,690 enforcement process. 2392 03:27:53,970 --> 03:28:02,150 On October 22nd, 2019, the executive officer upon board staff recommendation issued a 2393 03:28:02,150 --> 03:28:05,110 season to sister to the respondent. 2394 03:28:05,310 --> 03:28:07,650 We call a season to sister or a CDO. 2395 03:28:07,650 --> 03:28:13,530 Board staff also scheduled a CDO meeting as part of the Board's regular monthly meeting until I, 2396 03:28:13,790 --> 03:28:16,810 I'm sorry, on November 22nd, 2019. 2397 03:28:17,710 --> 03:28:27,270 On November 22nd, 2019, the Board unanimously affirmed the CDO and required the respondent to comply with it by December 23rd, 2019. 2398 03:28:28,110 --> 03:28:31,390 The respondent did attend and speak at the CDO meeting. 2399 03:28:32,250 --> 03:28:36,950 On November 25th, 2019, Board staff sent a letter to the respondent, 2400 03:28:36,950 --> 03:28:41,190 Notifying him of the Board's CDO meeting decision and required actions. 2401 03:28:41,870 --> 03:28:47,950 On December 20th, 2019, the respondent filed a Public Records Act request asking for 2402 03:28:47,950 --> 03:28:53,450 a copy of the November 22nd Board Meeting Transcript, Board staff provided the respondent 2403 03:28:53,450 --> 03:28:56,610 a copy of this meeting transcript on the same day. 2404 03:28:57,930 --> 03:29:04,970 On November 23rd, 2019, the respondent did not comply with the CDO as directed by the Board. 2405 03:29:04,970 --> 03:29:12,570 staff notified him via email of this non-compliance, and that board staff would be moving forward with his enforcement process. 2406 03:29:14,090 --> 03:29:19,170 January 24, 2020, board staff prepared a notice of public hearing package, 2407 03:29:19,810 --> 03:29:25,250 had sent it to the respondent via overnight mail, certified mail, regular mail, and email 2408 03:29:25,250 --> 03:29:31,170 with a link to an electronic document drop box. On January 28, 2020, 2409 03:29:31,170 --> 03:29:36,550 Board staff serve the notice of public hearing package to the respondent by posting it on the 2410 03:29:36,550 --> 03:29:43,070 respondent's front door porch at 7907 Garden Highway, which met our statutory 30-day advanced 2411 03:29:43,070 --> 03:29:49,030 notice requirement. Staff also received confirmation of the overnight mail delivery of the notice 2412 03:29:49,030 --> 03:29:58,050 of public hearing package on the same day. On January 29, 2020 Board staff sent the respondent 2413 03:29:58,050 --> 03:29:59,990 email with a service supposed 2414 03:30:00,000 --> 03:30:09,200 Judging Declaration for the notice of public hearing attached and requested his knowledge of the receipt. We did not receive any acknowledgment. 2415 03:30:10,320 --> 03:30:25,100 In February 13, 2020, no statement of defense or other evidence was received by Board staff from the respondent 15 days before the public hearing, per title 23, section 25, and the notice of public hearing document. 2416 03:30:25,920 --> 03:30:32,140 On February 19th, 2020, Board staff sent an email to the respond with a copy of the February 2417 03:30:32,840 --> 03:30:37,860 28th, 2020 board meeting agenda letting him know the public hearing for this enforcement case 2418 03:30:37,860 --> 03:30:41,140 would be held at 1 p.m. on February 28th. 2419 03:30:43,190 --> 03:30:48,250 We also called the respondent on February 21st and left a message for his mail message to let 2420 03:30:48,250 --> 03:30:53,350 him know the public hearing would be heard at 1 p.m. on February 28th. 2421 03:30:53,350 --> 03:30:56,530 Now, we're going to go through the staff analysis of 2422 03:30:56,530 --> 03:31:00,950 encroachments and activities that we observed at the property. 2423 03:31:01,450 --> 03:31:04,030 This portion of the presentation will highlight the activities 2424 03:31:04,030 --> 03:31:06,650 and encroachments which may have contributed to the water 2425 03:31:06,650 --> 03:31:07,590 side-broom erosion. 2426 03:31:08,510 --> 03:31:11,630 All of the following images for this portion were obtained 2427 03:31:11,630 --> 03:31:14,290 from Google Earth Historical imagery. 2428 03:31:15,510 --> 03:31:18,190 First item that we saw was the non-compliant 2429 03:31:18,190 --> 03:31:21,210 unauthorized retaining wall, which was installed along the 2430 03:31:23,290 --> 03:31:35,370 The picture on the left shows you the retaining wall in May of 2009, the picture on the right shows you the retaining wall, as it looked in February 2018, with part of it missing and part of it still there. 2431 03:31:38,690 --> 03:31:52,650 The next item we saw was a non-compliant unauthorized pond, south of the main dwelling and east of the non-compliant unauthorized retaining wall, which was installed around August 2009, soon after Missy and Mr. Chiang acquired the property. 2432 03:31:52,650 --> 03:32:01,210 This unauthorized pond was removed by April, April 2015, approximately six years after its installation. 2433 03:32:02,110 --> 03:32:06,830 The unauthorized pond may have contributed to the over-saturation of the water-side levy berm, 2434 03:32:07,150 --> 03:32:09,590 making this area more susceptible to erosion. 2435 03:32:13,630 --> 03:32:19,690 This here is, we observe some water-side berms of science, 2436 03:32:19,890 --> 03:32:22,130 one of the first photos you saw in this presentation. 2437 03:32:22,130 --> 03:32:29,410 So this waterside berm subsides occurred east of the unauthorized retaining wall and west of the pond and the 2438 03:32:29,410 --> 03:32:36,350 retaining wall itself subsided and this was observed by RD1000 staff in January 2011. 2439 03:32:37,370 --> 03:32:42,770 RD1000 staff met with Mitch Missy when this subsided and secured and recommended to her 2440 03:32:42,770 --> 03:32:48,230 that she contacted California Professional Engineer to develop a plan to address the subsides. 2441 03:32:49,070 --> 03:32:55,490 However, no such engineer plan was ever submitted to RD1000 or the board for review and approval. 2442 03:32:56,910 --> 03:33:05,250 Now, you can see the picture on the right shows how this is a downstream southern view of what happened there. 2443 03:33:05,530 --> 03:33:14,670 And the picture on the left shows the downstream view of what happened in the picture on the right shows the northern upstream view of what happened there. 2444 03:33:14,670 --> 03:33:20,270 And I would like you to take note of the many trees that are leaning over the waterside 2445 03:33:20,270 --> 03:33:24,950 berm over the water right there, because in the next slide, we're going to talk about that. 2446 03:33:26,940 --> 03:33:32,380 In 2011, large trees located north of the pond in west of the non-compliant retaining wall 2447 03:33:32,380 --> 03:33:37,720 fell into the Sacramento River due to lack of proper waterside and landside tree maintenance. 2448 03:33:38,580 --> 03:33:42,880 These up on these underlaying upended root structures of these collapsed trees, 2449 03:33:42,880 --> 03:33:48,200 Along with the trees themselves, lying in the water, may have contributed to the water-side 2450 03:33:48,200 --> 03:33:48,900 room erosion. 2451 03:33:49,500 --> 03:33:53,920 The picture on the left, you can see the tree is standing out. 2452 03:33:54,060 --> 03:33:59,500 There's a large shadow of the tree on the water, and in the picture on the right, you see 2453 03:33:59,500 --> 03:34:02,800 the trees lying in the water, right there. 2454 03:34:06,890 --> 03:34:12,550 Also in this picture, if you could write where the arrows come out of the text boxes, you 2455 03:34:12,550 --> 03:34:15,310 You can kind of see where the boat dock dislocated. 2456 03:34:15,630 --> 03:34:17,910 And we're going to talk about the boat dock at the next slide. 2457 03:34:18,950 --> 03:34:21,990 An authorized boat dock that was permitted fell into the state of 2458 03:34:21,990 --> 03:34:27,570 just repair from the lack of regular maintenance. 2459 03:34:28,090 --> 03:34:31,770 And in 2011, it appears to have washed away into the Sacramento River. 2460 03:34:32,110 --> 03:34:36,730 So in the picture on the right is when the boat dock is, we first have a good 2461 03:34:36,730 --> 03:34:43,370 or third of each of it, and in 2011 is when the Botak has disappeared. 2462 03:34:45,050 --> 03:34:50,230 The next item was part of a permanent deck on the west side of the dwelling was removed in 2013 2463 03:34:50,230 --> 03:34:53,250 without obtaining authorization from the board. 2464 03:34:53,770 --> 03:34:59,930 So you can see the deck on the left picture in 2012 and the deck on 2013 is reduced. 2465 03:35:00,820 --> 03:35:08,540 On the right picture, the removal of the deck and the underlying deck support structures may have contributed to the waterside Burma erosion. 2466 03:35:10,980 --> 03:35:28,800 The next items are, an author, an author, I structure was erected near the south east, dwelling corner in 2012. This 2012 structure was removed by January 2013. The other structure was erected west of the dwelling in 2013. 2467 03:35:28,800 --> 03:35:33,820 and that structure was removed by April 2015. 2468 03:35:34,720 --> 03:35:40,080 The erection and subsequent equipment removal of these unauthorized structures may have contributed 2469 03:35:40,080 --> 03:35:41,620 to the water site berm erosion. 2470 03:35:44,440 --> 03:35:48,080 The next item here is based on historical aerial imagery, 2471 03:35:48,500 --> 03:35:52,020 non-compliant unauthorized large bushy plants were grown 2472 03:35:52,020 --> 03:35:55,500 and then removed over a large area on the water site berm 2473 03:35:55,500 --> 03:36:03,440 West in South of the Dueling for four years, 2012, 2013, 2015, and 2016. 2474 03:36:04,440 --> 03:36:08,760 This repeated type of agricultural activity may have contributed to the over-saturation 2475 03:36:08,760 --> 03:36:13,460 of the water-side levee burn, making this area more susceptible to erosion. 2476 03:36:14,280 --> 03:36:20,020 In the picture on left, 2012, approximately 60 large bushy plants can be seen. 2477 03:36:20,020 --> 03:36:26,560 The picture on the right, for 2013, approximately 90 large bushy plants can be seen. 2478 03:36:28,390 --> 03:36:37,010 And here's the pictures of 2015 and 2016 in both pictures approximately 80 large bushy plants can be seen. 2479 03:36:39,190 --> 03:36:41,470 Our board staff conclusions are as follows. 2480 03:36:42,090 --> 03:36:51,050 There are numerous violations of the California Water Code, Title 23, and previous the issued permanent conditions for at 79 or 7 garden highway. 2481 03:36:51,050 --> 03:36:57,130 The previous property owners' actions may have contributed to the Sacramento River, Left Bank, 2482 03:36:57,330 --> 03:37:01,930 Levy, Waterside, Burm Erosion. The lack of regular maintenance on permanent 2483 03:37:01,930 --> 03:37:07,610 encroachments and the property in general, the unauthorized removal of permanent encroachments. 2484 03:37:08,250 --> 03:37:14,230 The installation of non-compliant unauthorized encroachments, and the unauthorized agricultural activities 2485 03:37:14,230 --> 03:37:20,030 over many years on the Waterside Burm are the main observed contributing factors to the 2486 03:37:20,030 --> 03:37:23,090 control the water side burn erosion at this location. 2487 03:37:23,990 --> 03:37:28,290 The respondent has the new property owner being fully aware of the property's condition 2488 03:37:28,290 --> 03:37:33,610 before purchase, is now responsible for the repair of the water side burn erosion. 2489 03:37:36,240 --> 03:37:38,580 Our board staff recommendations are as follows. 2490 03:37:39,560 --> 03:37:46,060 To adopt the proposed enforcement order, number 2020-01, and as noted in attachment A in 2491 03:37:46,060 --> 03:37:51,580 the staff report, for the respondent which holds him both responsible and liable for the 2492 03:37:51,580 --> 03:37:53,840 repair of the water side burn and other violations. 2493 03:37:55,140 --> 03:37:57,720 And, orders that we respond it to secure the water side 2494 03:37:57,720 --> 03:38:01,660 levee burn by March 30th, 2020, to prevent further 2495 03:38:01,660 --> 03:38:02,920 water side burn erosion. 2496 03:38:04,920 --> 03:38:08,080 Second, direct support staff to record this enforcement order 2497 03:38:08,080 --> 03:38:11,140 with the office of the County Recorder for Sacramento County 2498 03:38:11,140 --> 03:38:14,360 to ensure that any potential future buyer of this property 2499 03:38:14,360 --> 03:38:16,960 is fully aware of the enforcement action 2500 03:38:16,960 --> 03:38:19,120 and it's required corrective actions. 2501 03:38:21,520 --> 03:38:29,720 3, revokes that the 3 previous issued encroach from permits for the, sorry, revokes 2502 03:38:29,720 --> 03:38:34,740 3, previously issued encroach from permits for encroachments that now no longer physically 2503 03:38:34,740 --> 03:38:35,440 exists. 2504 03:38:36,100 --> 03:38:42,700 Permit number 1, 2, 5, 3, 5, 8, issued to retain an existing corral fence, redwood decking 2505 03:38:42,700 --> 03:38:43,340 and spawn. 2506 03:38:43,340 --> 03:38:50,100 Permit number 1, 3, 5, 3, 1, issued to install a boat dock anchored by cable and concrete 2507 03:38:50,100 --> 03:38:50,740 deadmen. 2508 03:38:51,460 --> 03:38:58,420 Permit number 1, 4, 5, 3, issued to a place rip wrap on the water side berm south of the dwelling. 2509 03:39:01,100 --> 03:39:07,860 And the last item in the order is to impose an administrative penalty of $16,000, based 2510 03:39:07,860 --> 03:39:13,020 upon the five factors set forth in section four of the staff report, and also identified 2511 03:39:13,020 --> 03:39:18,660 in California water code 80704 and is determined as follows. 2512 03:39:19,940 --> 03:39:25,880 Violations 5 and 6 were assessed the highest administrative penalty at $50,000 each because 2513 03:39:25,880 --> 03:39:28,920 of their severity and high risk of damage to the floodway. 2514 03:39:29,500 --> 03:39:35,620 The remaining violations were considered low risk of damage to the floodway and therefore 2515 03:39:35,620 --> 03:39:39,480 assessed the minimum administrative penalty at $500 each. 2516 03:39:39,480 --> 03:39:47,480 Please note that violations 8 and 11 have been corrected and we're not included as part of the proposed penalty calculation. 2517 03:39:49,830 --> 03:39:54,770 In conclusion, Board staff has been in contact with respondents since May 2019. 2518 03:39:55,870 --> 03:39:59,810 Board staff has attempted to achieve compliance with the previous property owners. 2519 03:40:00,000 --> 03:40:06,820 And the respondent, at the lowest possible level, level, over the past two years. Unfortunately, this 2520 03:40:06,820 --> 03:40:11,680 is not occurred, the being staff with no other option, but to proceed with our enforcement 2521 03:40:11,680 --> 03:40:18,100 process in order to preserve the safety of the responded and the public. It should be noted 2522 03:40:18,100 --> 03:40:22,840 that the respondent has made past statements to board staff leading them to believe that he would 2523 03:40:22,840 --> 03:40:27,020 comply with the NOB and the CDO corrective actions. 2524 03:40:27,740 --> 03:40:30,000 Respondent also indicated to the Board itself 2525 03:40:30,000 --> 03:40:33,840 at the November 22nd CDO meeting that he would comply 2526 03:40:33,840 --> 03:40:35,040 with the corrective actions. 2527 03:40:35,640 --> 03:40:37,220 This is not occurred at this time. 2528 03:40:41,440 --> 03:40:42,900 And that concludes my presentation. 2529 03:40:43,420 --> 03:40:44,980 I'm available to answer any questions. 2530 03:40:45,160 --> 03:40:47,420 The Board members may have regarding miscades. 2531 03:40:48,280 --> 03:40:51,420 Question from the Board at this point of Mr. Tyson. 2532 03:40:57,520 --> 03:40:58,480 OK, thank you, John. 2533 03:40:58,980 --> 03:40:59,580 Thank you. 2534 03:40:59,580 --> 03:41:03,100 There does, do you have any other people? 2535 03:41:03,100 --> 03:41:05,460 No, not unless the board has any questions at me. 2536 03:41:08,120 --> 03:41:09,420 Don't hear any at this point. 2537 03:41:09,960 --> 03:41:14,200 So we'll have the responded, make it case, please. 2538 03:41:21,190 --> 03:41:24,990 I'm going to have another gentleman speak after I get done. 2539 03:41:27,030 --> 03:41:29,710 In your, excuse me, I was under oath. 2540 03:41:30,050 --> 03:41:32,210 And if you could all say, or if you'd like to, 2541 03:41:32,250 --> 03:41:33,250 I'd like to thank you for the rest of me. 2542 03:41:35,030 --> 03:41:39,430 Mr. Meyer, if you could also please state your name for the record as you begin your 2543 03:41:40,070 --> 03:41:40,550 presentation. 2544 03:41:40,970 --> 03:41:41,450 Thank you. 2545 03:41:41,570 --> 03:41:42,950 Thank you. 2546 03:41:42,950 --> 03:41:43,070 Thank you. 2547 03:41:43,070 --> 03:41:43,550 Okay. 2548 03:41:44,970 --> 03:41:49,470 Approximately May, I took the initiative to contact the Central Valley Flood 2549 03:41:49,470 --> 03:41:54,210 because Peggy E told me of some existing problems. 2550 03:41:54,790 --> 03:41:55,790 They didn't come after me. 2551 03:41:55,850 --> 03:41:56,410 I went to them. 2552 03:41:56,550 --> 03:41:59,530 I went to John's office, sat there with him for several hours. 2553 03:41:59,650 --> 03:42:01,130 He gave me title 23. 2554 03:42:01,130 --> 03:42:07,810 It's extensive and it could be a career move on its own, but at any rate, I reviewed it. 2555 03:42:07,810 --> 03:42:13,570 And then I start reviewing a few things, most of the violations that are listed there 2556 03:42:13,570 --> 03:42:18,410 that were from years back well before May when I came on the scene. 2557 03:42:19,090 --> 03:42:22,810 Okay, so these things did occur, but I didn't do. 2558 03:42:23,890 --> 03:42:30,190 There is a stipulation in the permit from 1964 when the property was originally constructed, 2559 03:42:30,190 --> 03:42:33,150 that says that the homeowner will maintain. 2560 03:42:33,750 --> 03:42:42,010 So I looked up the definition of maintenance and it says existing items to be kept to their 2561 03:42:42,010 --> 03:42:44,470 standard of their original construction. 2562 03:42:45,390 --> 03:42:49,330 So we're not looking at, and I'm focusing primarily on the riverside. 2563 03:42:49,550 --> 03:42:53,510 We're not looking at a maintenance, we're looking at a new construction. 2564 03:42:54,490 --> 03:43:01,330 So from the very beginning, I said to John, normally, as an example, if somebody smashes into 2565 03:43:01,330 --> 03:43:08,050 your car, you define who did the smashing, and then you say, hey, you need to fix my car. 2566 03:43:09,130 --> 03:43:13,970 You don't go looking for some guy on the curb and say, oh man, that other guy just took off. 2567 03:43:14,010 --> 03:43:15,230 Now you got to fix my car. 2568 03:43:16,090 --> 03:43:22,310 So first of all, I'm not liable based on the new owner or successor based on maintenance, 2569 03:43:22,310 --> 03:43:29,430 because there's no maintenance. It's gone. I read the class action lawsuit. There were over 2570 03:43:31,270 --> 03:43:37,450 almost 2,000 victims of this high-water event. And even in the violation, John says, 2571 03:43:38,390 --> 03:43:45,210 this occurred due to high-water event of February 12 through 14. 2572 03:43:46,090 --> 03:43:50,270 That high-water event is directly related to oral-filled end. 2573 03:43:51,450 --> 03:43:57,210 The case class action lawsuit has many litigants, many attorneys, and every one of them 2574 03:43:57,210 --> 03:44:04,970 say that the liable party from the high-water event is the lack of maintenance by the department 2575 03:44:04,970 --> 03:44:06,070 of water resources. 2576 03:44:06,790 --> 03:44:11,790 So it has been my position from the beginning that I'm not the guy who should pay to repair 2577 03:44:11,790 --> 03:44:18,630 this. I should not be the guy named in the violation. My assistant here, David, read a deal that 2578 03:44:18,630 --> 03:44:25,530 says that it is the duty of the Department of Water Resources to determine liability. And from 2579 03:44:25,530 --> 03:44:31,610 the very beginning, there never was any effort to determine liability. It was just year the guy, 2580 03:44:31,850 --> 03:44:37,230 year there, you bought the property, you got to fix it. So I'm not trying to give anybody a hard 2581 03:44:37,230 --> 03:44:44,110 I'm just a busy guy. What I do for a living is I design medical analytical equipment things that save lives 2582 03:44:44,110 --> 03:44:52,530 I'm a 20-hour a day guy, so squeezing in all of these things is challenging. In addition, every attorney that I spoke to 2583 03:44:53,450 --> 03:44:54,230 would not 2584 03:44:54,230 --> 03:44:59,950 Let me hire them because they said they all worked for you and they don't want to cross you guys 2585 03:45:00,000 --> 03:45:29,980 And the Department of Water Resources to represent a private party. So I went to the self-help, this and that. I wrote my own activities, my own actions. I did my own efforts. And basically, when you have two parties. And they can't come to any kind of reason of all understanding. You guys are saying not you, but your group. You know, are saying, you bought the house, you're liable. You got to fix it. That was even just one thing. 2586 03:45:30,000 --> 03:45:31,920 on statement here a few minutes ago. 2587 03:45:32,240 --> 03:45:35,680 Yes, I did buy the property, but I didn't do the damage. 2588 03:45:36,920 --> 03:45:39,560 And as far as things like plants growing there 2589 03:45:39,560 --> 03:45:41,300 and potentially weakening something, 2590 03:45:42,460 --> 03:45:44,320 I can hire some physicists and some people. 2591 03:45:44,460 --> 03:45:46,540 And if we have to get down to the needy gritty, 2592 03:45:46,900 --> 03:45:48,640 I'm not concerned about those things. 2593 03:45:48,720 --> 03:45:51,320 I'm also not concerned about the 2011 2594 03:45:52,860 --> 03:45:56,320 when Peggy E called in and said some dirt fell down 2595 03:45:56,320 --> 03:45:57,940 at the south end of the property. 2596 03:45:58,260 --> 03:45:59,280 It did do that. 2597 03:45:59,280 --> 03:46:01,440 And I'm happy to fix it. 2598 03:46:01,700 --> 03:46:06,040 But the problem here is liability, liability, liability. 2599 03:46:06,820 --> 03:46:07,760 I didn't do it. 2600 03:46:08,020 --> 03:46:09,740 The Department of Water Resources did. 2601 03:46:10,280 --> 03:46:11,700 There's a hundred other lawsuits. 2602 03:46:12,480 --> 03:46:15,420 City of Chicos, sued, the Department of Water Resources 2603 03:46:15,420 --> 03:46:19,280 just won a $13 million lawsuit for flooding their streets 2604 03:46:19,280 --> 03:46:22,100 and wrecking them, the Ramsey, the District Attorney 2605 03:46:22,100 --> 03:46:25,400 of Bute County, sued the Department of Water Resources 2606 03:46:25,400 --> 03:46:28,940 for dumping, encroaching, dumping dirt and debris 2607 03:46:28,940 --> 03:46:34,900 to the river. It was so occluded that they had to net the fish and relocate them to save the 2608 03:46:34,900 --> 03:46:42,080 salmon. So here I come along and I buy a house and the Department of Water resources did 2609 03:46:42,080 --> 03:46:47,520 the damage. So John tells me, okay, we come to the last hearing and I said, you know, I'm on 2610 03:46:47,520 --> 03:46:54,160 your side. I want this thing fixed. It needs fixed. But I continue to say, I am not the 2611 03:46:54,160 --> 03:47:02,820 Iowa Party. So, that has been a big impact. John told me what would be a good show of effort 2612 03:47:02,820 --> 03:47:09,000 to fix the thing would be to hire a new engineer. I did a stabilization plan and what 2613 03:47:09,000 --> 03:47:15,260 I did is I accumulated all the existing documentation. I got MBK's engineering report 2614 03:47:15,260 --> 03:47:21,220 where they asked for emergency permit clear back in 2018. I asked John was that emergency permit 2615 03:47:21,220 --> 03:47:26,440 ever issued?" He said, no, I don't know why. It should have been issued. It should have been 2616 03:47:26,440 --> 03:47:34,520 fixed March of 2018. Why wasn't that permit issued? Anyway, I contacted MBK and they said 2617 03:47:34,520 --> 03:47:40,620 they're not geotechnical. I then called 100. I'm literally telling you. I called the University 2618 03:47:40,620 --> 03:47:46,800 of Colorado Engineering Department asked for references to get a geotechnical engineer. Nobody 2619 03:47:46,800 --> 03:47:51,740 will work for a private citizen. I finally found the guy named, I hope I get his name 2620 03:47:51,740 --> 03:47:58,360 right, Todd Thomas Rius and over in woodlands. And I talked to Nolan and attorney over there 2621 03:47:58,360 --> 03:48:02,880 who's in the class action lawsuit against the Department of Water Resources and he told me 2622 03:48:02,880 --> 03:48:09,920 about Todd. And I said, Todd, you know, John, John, he said, yeah, we used to work together in the 2623 03:48:09,920 --> 03:48:14,800 city. And so I said, good, do you know what's required to come up with a stabilization plan? 2624 03:48:14,800 --> 03:48:20,740 said, yeah, we do that kind of thing. I said, good, I need to hire you. So I said, the way I do 2625 03:48:20,740 --> 03:48:27,400 things and maybe you can talk to me about this, if I have a broken car, I take it in and I 2626 03:48:27,400 --> 03:48:32,600 say, look it over and then you tell me what we're going to do to fix it. And if it's too much 2627 03:48:32,600 --> 03:48:39,520 or whatever, then I decide my plan. So that's what Todd and I did. Todd wrote a contract for 2628 03:48:39,520 --> 03:48:45,880 stabilization plan to proceed with an initial site review to determine what work, 2629 03:48:45,960 --> 03:48:50,920 what drawings, what engineering plans needed to be done. But he said, this was the 2630 03:48:50,920 --> 03:48:55,120 middle of December. And by the way, I, so I just bought the house in September. I 2631 03:48:55,120 --> 03:49:01,560 did contact John the minute that I started looking at it in May. So then, we get down to 2632 03:49:02,280 --> 03:49:09,500 Tom Rice, and he says, I'm busy, man. You're calling me here, and you're asking me to 2633 03:49:09,500 --> 03:49:12,240 until January the 10th. 2634 03:49:12,480 --> 03:49:17,100 So I said that to John, I can't do anything without the engineer to come out here and do 2635 03:49:17,100 --> 03:49:21,800 the drawings, do the soil surveys or whatever you want to do. 2636 03:49:22,460 --> 03:49:28,500 And in the meantime, Todd sends me a contract signed, I signed it, send it over to John. 2637 03:49:28,960 --> 03:49:33,040 And then a short time later, I get a note back saying, we're not going to accept this. 2638 03:49:33,100 --> 03:49:35,600 You didn't show any good faith, you didn't show any effort. 2639 03:49:35,600 --> 03:49:45,000 All I was trying to do was review the situation and then have him come back and say, okay, we need 5,000 for some kind of an engineering review. 2640 03:49:45,120 --> 03:49:50,800 We need 5,000 for this, we need 2,000 for that and then I'd say, okay, we're going to do it. 2641 03:49:50,920 --> 03:49:54,000 How are you going to do it and we'll talk to John? I never got that for it. 2642 03:49:54,260 --> 03:49:56,840 Because John pooped it before it even got that far. 2643 03:49:57,200 --> 03:49:59,960 So it isn't a lack of good faith on my part. 2644 03:50:00,210 --> 03:50:12,010 I feel like I'm in an adversary situation. I have spent most of my life working to fix things, what I, and the machines I design for medicine are things that nobody else can figure out how to do. 2645 03:50:12,330 --> 03:50:23,410 And I resolve it and people let me do it. I said to John, if you get off my back and let me fix this river bank, I'll go out there with a bulldozer and I'll bring in the rock rip wrap and I'll get this thing done and I'll do it with an engineer. 2646 03:50:23,410 --> 03:50:26,150 Oh, no, no, we can't do it that way. 2647 03:50:27,070 --> 03:50:30,430 So maybe I'm not trying to be hard. 2648 03:50:30,810 --> 03:50:32,550 I'm not trying to cause a problem. 2649 03:50:33,010 --> 03:50:34,850 I found a property in May. 2650 03:50:34,870 --> 03:50:36,170 I bought it in September. 2651 03:50:36,870 --> 03:50:40,290 And now you're telling me you're considering demolishing 2652 03:50:40,290 --> 03:50:41,030 my house. 2653 03:50:41,050 --> 03:50:44,630 That's what his report says, possibly demolished the house. 2654 03:50:45,090 --> 03:50:45,490 What? 2655 03:50:46,450 --> 03:50:47,090 Is this America? 2656 03:50:47,630 --> 03:50:52,390 I mean, anyway, I'm so emotionally hostile by this thing 2657 03:50:52,390 --> 03:50:56,030 that I have the other gentleman Dave Cumm, he'll talk for a minute. 2658 03:50:56,950 --> 03:50:59,890 I'd like to figure out how we can work together and get this done, 2659 03:51:00,070 --> 03:51:04,350 but you cannot tell me get an engineer and I have the engineer lined up and give a sign 2660 03:51:04,350 --> 03:51:09,450 of contract, but we're going to do it in steps, which is the way you do everything that comes 2661 03:51:09,450 --> 03:51:12,810 out right, and then you smash it before it even gets off the ground. 2662 03:51:13,650 --> 03:51:16,750 Your organization has done that every step of the way. 2663 03:51:17,150 --> 03:51:20,610 Peggy even told me at one time they John told her, 2664 03:51:20,610 --> 03:51:26,170 Well, we can get you a 3% loan and it only cost a couple hundred thousand to fix this 2665 03:51:26,170 --> 03:51:31,790 saying and then she said, then they came back and said, oh no, it's going to cost a million 2666 03:51:31,790 --> 03:51:32,830 and there is no loan. 2667 03:51:33,850 --> 03:51:35,630 That's why Peggy gave up. 2668 03:51:35,930 --> 03:51:38,890 So, I'm running into the same stuff as debating the carrot. 2669 03:51:39,270 --> 03:51:45,090 They keep, come along, just do this, just do that, everything's fine, I do it and I start 2670 03:51:45,090 --> 03:51:48,090 with it and then, no, you can't, we're not going to do that. 2671 03:51:48,090 --> 03:51:55,470 So I am getting the impression that somebody must just want my property for nothing they want to condemn it and just steal it from me. 2672 03:51:55,670 --> 03:52:04,050 That's the way I feel. So again, I'm too emotionally involved in this thing. I'm ready for war, but I'd rather have peace. 2673 03:52:04,430 --> 03:52:10,310 Work with me and fix this. I don't owe you a hundred thousand dollar fine. I didn't do anything. I just bought a property. 2674 03:52:10,310 --> 03:52:19,370 I'm not trying to resist you, I'm trying to find a pathway to a solution, but you've got to quit stepping on my face every time I try to do something. 2675 03:52:19,790 --> 03:52:21,530 So I'm going to let Dave talk to you. 2676 03:52:21,810 --> 03:52:23,390 I've had all I got to say. 2677 03:52:29,280 --> 03:52:33,540 Members of the board, my name is David Taylor and I give a old to tell the truth, the old truth. 2678 03:52:35,280 --> 03:52:37,340 I noticed David Taylor. 2679 03:52:37,360 --> 03:52:37,740 Taylor. 2680 03:52:38,280 --> 03:52:38,520 Thank you. 2681 03:52:38,880 --> 03:52:39,840 David, David, that's Taylor. 2682 03:52:42,160 --> 03:52:50,800 I noticed this is a testimony that Mr. Taylor before you speak. Could you please for the record explain if you're representing? 2683 03:52:51,260 --> 03:52:54,980 I'm interested in part of the Irrevocable Trust. 2684 03:52:57,320 --> 03:53:00,320 Sarah mentioned that the property is the same or worse condition. 2685 03:53:00,320 --> 03:53:26,000 And for me, a lot of things I find a lot of holes in the explanation that was presented or served to John Tice at his home, events occurring prior to 2018 is not in their report that was admitted to us, so we're not able to defend what they presented today, which was exceeding that notice. 2686 03:53:28,400 --> 03:53:33,180 To do certain events that happened even earlier today, you guys are witness to the strain 2687 03:53:33,820 --> 03:53:38,120 on available resources to fix the water problems in California. 2688 03:53:38,920 --> 03:53:43,840 As you notice, a lot of the engineers are already backed up and you guys yourselves are 2689 03:53:43,840 --> 03:53:49,840 not able to fulfill the reconstruction of sites that are delegated and already associated 2690 03:53:49,840 --> 03:53:53,520 funding to do so you guys are not able to meet certain deadlines. 2691 03:53:53,520 --> 03:54:03,520 And I feel that that burden put on to this private citizen who has been showing good faith in trying to get some remedies with equality to the situation. 2692 03:54:04,120 --> 03:54:05,800 It hasn't been met or addressed. 2693 03:54:06,400 --> 03:54:07,860 And so I just want to bring that to attention. 2694 03:54:08,160 --> 03:54:12,760 So, however, you guys can give some equal review in the situation itself. 2695 03:54:14,380 --> 03:54:19,000 There was a request that was made, and that was stipulated in this report. 2696 03:54:19,000 --> 03:54:27,440 is also testified here that a request was made for a copy of the transcripts for the November 2697 03:54:27,440 --> 03:54:35,620 22nd I believe hearing and that it was the transcript was given to the respondent same 2698 03:54:35,620 --> 03:54:42,020 day and there is no evidence of that. There was a response stating that you have to follow 2699 03:54:42,020 --> 03:54:47,920 a somewhat a procedure but that no transcripts were provided and I do want to bring that to note 2700 03:54:47,920 --> 03:54:55,320 that that's something that was inconsistent with the prosecution's relationship with the defendant 2701 03:54:55,320 --> 03:54:59,620 and good faith. There's a couple of things in the time. 2702 03:55:00,000 --> 03:55:07,860 That have caused the perception to be that efforts being made were not being considered. 2703 03:55:08,880 --> 03:55:13,820 It wasn't even given a resolution as to resolve issues that may complete a resolution. 2704 03:55:14,340 --> 03:55:20,200 It was just flat-out rejected, primarily without clear explanation as to what was rejected. 2705 03:55:21,180 --> 03:55:29,980 They state that they put everything in their response, and I'm still trying to review and look for remedies to the efforts that the respondents has made. 2706 03:55:29,980 --> 03:55:40,060 And I have yet to find clear reference to how to make this process equitable for the fixing in the repair. 2707 03:55:40,800 --> 03:55:43,960 When permits are rejected, emergency permits are rejected. 2708 03:55:51,890 --> 03:56:02,590 The structural plan requests, the stabilization plan requests that was submitted due to an engineer that you guys represent. 2709 03:56:02,590 --> 03:56:07,410 And who also spoke here today, who's illustrating the same issues of there's some funding and 2710 03:56:07,410 --> 03:56:13,070 resource issues that's going to have a time constraint on the repair that that was rejected. 2711 03:56:13,810 --> 03:56:19,770 And seeing these inconsistencies as far as just a prima facia administration of requests 2712 03:56:19,770 --> 03:56:23,490 and the requests for repairs has skewed. 2713 03:56:24,230 --> 03:56:28,990 We did have conversation prior to this meeting and to this appointment of time in the minutes 2714 03:56:28,990 --> 03:56:34,930 with the prosecution that their request, which has now been disclosed to us. 2715 03:56:35,130 --> 03:56:39,950 Now, what is, if we had placed some retention, 2716 03:56:42,290 --> 03:56:46,930 risk-winged plastic, that that would help resolve the immediate issue. 2717 03:56:47,830 --> 03:56:52,390 And we're like, that's fine, but even in consideration of the requests, 2718 03:56:53,050 --> 03:56:58,830 you notice in the report, even though the last two violations on the request was already resolved, 2719 03:56:58,830 --> 03:57:01,030 But it was still included on there. 2720 03:57:01,290 --> 03:57:06,630 And by mission and I appreciate John's truthful testimony in that it was not an issue. 2721 03:57:07,230 --> 03:57:09,430 He didn't state when it was resolved. 2722 03:57:10,550 --> 03:57:15,430 As soon as the respond it was aware of it, he addressed it and things that weren't requirement 2723 03:57:15,430 --> 03:57:21,730 permits and geological reviews and other constraints. 2724 03:57:22,350 --> 03:57:24,450 He addressed it immediately and had it resolved. 2725 03:57:25,210 --> 03:57:31,630 And he continues to intend to resolve the matter, according to you guys' standards, but certain 2726 03:57:31,630 --> 03:57:35,590 standards has to be disclosed so that we can respond accordingly, not keep hitting 2727 03:57:35,590 --> 03:57:36,250 the ball. 2728 03:57:37,630 --> 03:57:41,810 You know, doing what was requested, oh, that's not good enough, well, there's no, do notice. 2729 03:57:42,590 --> 03:57:47,250 You know, there's no clarity as to what the request is and that's a way to avoid a vagueness. 2730 03:57:48,430 --> 03:57:53,770 And for the most part, that's kind of our position that we are willing and we'll try to resolve 2731 03:57:53,770 --> 03:57:59,450 the matter that's equitable to the situation and that there is some violations that are 2732 03:57:59,450 --> 03:58:02,550 have been occurring on the prosecution side as far as notice. 2733 03:58:05,440 --> 03:58:05,720 Thank you. 2734 03:58:05,820 --> 03:58:06,680 Thank you. 2735 03:58:20,540 --> 03:58:20,940 Thank you. 2736 03:58:20,940 --> 03:58:22,220 Good afternoon, President Edgar. 2737 03:58:22,280 --> 03:58:23,000 Members of the board. 2738 03:58:23,340 --> 03:58:26,920 Angela Salisa board, enforcement staff, Section Chief. 2739 03:58:27,400 --> 03:58:29,800 I did take this far in this morning or before this hearing. 2740 03:58:30,280 --> 03:58:33,020 I'd like to thank you for the opportunity to rebutto a few items. 2741 03:58:33,020 --> 03:58:41,320 Mr. Meyer in his, the other person with him, Mr. Taylor is the stated in there, a few 2742 03:58:41,320 --> 03:58:48,200 clarifications that I'll like to point out. The, the, the, let's start with the easier, let's 2743 03:58:48,200 --> 03:58:52,600 see going through my notes here. The plans that were submitted by Mr. Meyer or he's indicated 2744 03:58:52,600 --> 03:58:57,980 by December 23rd. The reason for that's the middle that was deemed inadequate by staff is 2745 03:58:57,980 --> 03:59:03,000 because the agreement that was submitted to staff that he filed with the consulting firm was 2746 03:59:03,000 --> 03:59:09,180 to do a site visit. It was not to develop a stableization plan which was required by the board 2747 03:59:09,180 --> 03:59:17,120 when it affirmed CDO at the November 22nd board meeting. So therefore, the board had requested that 2748 03:59:17,120 --> 03:59:23,460 Mr. Meyer may significant progress to address the issues with the CDO. We felt that based on that 2749 03:59:23,460 --> 03:59:29,000 agreement that we had received a copy of a site visit really fell short of meeting the intent of 2750 03:59:29,000 --> 03:59:32,100 And that is why we submitted that response to Mr. Meyer. 2751 03:59:33,300 --> 03:59:37,020 The order before you today does not require, is not asking that the board 2752 03:59:37,020 --> 03:59:39,180 demolished the home as Mr. Meyer stated. 2753 03:59:39,860 --> 03:59:44,940 Rather, the order before you is asking for Mr. Meyer to stabilize a site to protect 2754 03:59:44,940 --> 03:59:50,440 his home and protect the erosion from continuing to get worse at the site. 2755 03:59:52,860 --> 03:59:59,840 Mr. John Tyre's can speak to his conversation with Mr. Meyer or Mr. Yee's, we've got an 2756 04:00:00,000 --> 04:00:06,780 I can tell you that organization is not in the business of doing loans, so that holds no truth. 2757 04:00:07,700 --> 04:00:14,780 Regarding the request for Mr. Meyer for the PRA that was submitted, we do not have a copy of it in the staff report. 2758 04:00:15,040 --> 04:00:26,080 That's correct. But what I do have in front of me is a copy of the email from staff that provided the board meeting transcript to Mr. Meyer. 2759 04:00:26,080 --> 04:00:32,600 And if you allow me to, I can read it off the email that was submitted, that was provided to us by Board staff. 2760 04:00:33,920 --> 04:00:42,260 So, this email is from Hunt, a data hunt who is a Board staff, and it's dated January 9th, 2020, a two-a-one PM. 2761 04:00:42,960 --> 04:00:48,460 And what she says in her email is, is, hi, and fill is pre-request on December 20th, 2019. 2762 04:00:48,460 --> 04:00:55,420 Mr. Lee Amire called Data Hunt, public records are public records act coordinator for the board. 2763 04:00:56,300 --> 04:01:04,880 Mr. Meyer requested a copy of the CVFPV transcript for the November, this one's a type which is November 11, 2019 board meeting. 2764 04:01:05,580 --> 04:01:12,980 Later that morning, data provided a copy of the transcript to Mr. Meyer through the Department of Water Resources Government QA system. 2765 04:01:12,980 --> 04:01:18,540 The government QA system is how the PRA's requests are officially transmitted to the 2766 04:01:18,540 --> 04:01:24,440 request, due to an issue with the original email address provided by Mr. Meier, 2767 04:01:24,760 --> 04:01:29,980 that I followed up with an email attached, informing Mr. Meier where he can access the 2768 04:01:29,980 --> 04:01:36,340 information requested. And what she attached to the name was a December 20th email that 2769 04:01:36,340 --> 04:01:44,260 is sent to Liam Myers, L-I-M-L-I-A-M-M-E-Y-E-R-15 2770 04:01:44,260 --> 04:01:49,440 at MSN.com, and that was on Friday, December 20, 2019, 2771 04:01:49,640 --> 04:01:53,320 at 1050-A-M, and the email goes on to say, 2772 04:01:53,440 --> 04:01:56,000 Dear Mr. Forward slash, Ms. Meyer. 2773 04:01:56,440 --> 04:01:58,280 Thank you for your interest in the public records 2774 04:01:58,280 --> 04:01:59,840 of the Central Valley Flip Protection Board. 2775 04:02:00,180 --> 04:02:02,200 This is in response to your December 2019, 2776 04:02:02,380 --> 04:02:05,760 pursuant to the California Public Records Act, 2777 04:02:05,760 --> 04:02:10,760 government code section in 6250 to the Central Valleful Protection Board meeting required 2778 04:02:10,760 --> 04:02:19,120 request in records for the Central Valleful Protection Board transcript for November 22nd, 2019. 2779 04:02:19,960 --> 04:02:24,480 It has been determined that the CVFPV maintains the records a responsive to your request 2780 04:02:24,480 --> 04:02:29,160 to express and electing them and reviewing the records and they can be made available to 2781 04:02:29,160 --> 04:02:30,480 this number 29. 2782 04:02:32,860 --> 04:02:37,560 What did I explain is that in that email that was sent to Mr. Meyer was sent 2783 04:02:37,560 --> 04:02:47,180 on the 20th of December at 10.52 a.m. And it included a copy of the attached transcript. And I'm 2784 04:02:47,180 --> 04:02:52,560 sorry I don't have a way of connecting the my laptop to the presentation here. But if you like 2785 04:02:52,560 --> 04:02:57,220 me to I can print out copies of this email and provide them to you for your reference as well. 2786 04:02:58,860 --> 04:03:10,220 So the answer to the question is, after all of that, he did get a copy of the transcript, did that come back. 2787 04:03:11,680 --> 04:03:11,940 So. 2788 04:03:13,300 --> 04:03:16,800 Even in our testimony, say that the committee, I'll talk to you. 2789 04:03:16,800 --> 04:03:19,100 I'm not having a test of the chair here. 2790 04:03:19,720 --> 04:03:24,380 Even in our testimony, stated that they are going to be compiling it, and that they 2791 04:03:24,380 --> 04:03:27,820 expected to be ready by December 29, 2019, is that correct? 2792 04:03:30,620 --> 04:03:36,780 Well, Mr. President, I would ask that if respondent wishes to respond to 2793 04:03:36,780 --> 04:03:40,980 finish allowing staff to present their rebuttal and then take other 2794 04:03:40,980 --> 04:03:42,960 and so they're not talking over each other? 2795 04:03:43,340 --> 04:03:43,760 I understand, 2796 04:03:45,920 --> 04:03:49,120 the question is, did they get the transcript or not? 2797 04:03:49,440 --> 04:03:53,740 We don't have an agreement on whether they got that or not, I don't understand that. 2798 04:03:53,800 --> 04:03:58,640 What I would say to that Mr. President, is that Dettahant, who's the coordinator for the board 2799 04:03:58,640 --> 04:04:03,960 for such requests, indicated to me that she provided that to Mr. Meyer, I don't know if 2800 04:04:03,960 --> 04:04:07,860 she received the confirmation from Mr. Meyer for such receipt. 2801 04:04:07,860 --> 04:04:12,900 As far as the email that she submitted to me, she was under the understanding that he received that information. 2802 04:04:13,140 --> 04:04:15,020 The same day he requested it. 2803 04:04:15,320 --> 04:04:15,500 Okay. 2804 04:04:16,080 --> 04:04:16,280 Fine. 2805 04:04:18,940 --> 04:04:20,240 Thank you, Anglees. 2806 04:04:24,000 --> 04:04:28,580 Okay. At this point, I think we'll ask the board if you have any questions. 2807 04:04:30,680 --> 04:04:35,180 Mr. President, I believe Mr. Tyson was going to come up and respond to some of the other. 2808 04:04:40,750 --> 04:04:41,050 Okay. 2809 04:04:44,010 --> 04:04:47,330 Mr. President, Madam Vice President, Members of the Board. 2810 04:04:48,870 --> 04:04:56,430 When we served Mr. Meyers, I'm sorry, when we serve Mr. Meyers with the notice of the 2811 04:04:56,430 --> 04:04:59,990 hearing and the staff report, etc. We also indicate- 2812 04:05:02,640 --> 04:05:11,160 The title 23 required if he intended to respond and file written response that he should do so 15 days prior to the hearing. 2813 04:05:11,960 --> 04:05:19,000 We didn't receive anything. So there was never any formal response, not to say that the board can't consider. 2814 04:05:19,000 --> 04:05:27,200 However, it's difficult for staff to be able to respond to claims such as that we're just 2815 04:05:27,200 --> 04:05:34,460 made without having that type of formal, formal notice as to what's going to be presented. 2816 04:05:34,920 --> 04:05:36,640 So I just wanted to point that out, John. 2817 04:05:40,530 --> 04:05:43,850 John Tyson with the Central Life, well, protection for enforcement section. 2818 04:05:44,550 --> 04:05:50,090 And no time did I tell Ms. Yee, she could get a loan from the state to help prepare a property. 2819 04:05:50,930 --> 04:05:52,770 That did not happen. 2820 04:05:54,310 --> 04:05:54,810 Thank you. 2821 04:05:56,130 --> 04:05:56,670 Okay. 2822 04:05:56,790 --> 04:05:58,870 I'll bring this back to the board for a minute. 2823 04:05:59,370 --> 04:06:04,450 Questions for the board for the staff or the respondent? 2824 04:06:09,110 --> 04:06:09,330 Nice. 2825 04:06:09,430 --> 04:06:15,590 Somebody to speak to the 2017 request for him became the site. 2826 04:06:15,690 --> 04:06:17,210 It's in the packet as well. 2827 04:06:17,210 --> 04:06:21,790 And it was brought up, something that wasn't issued or addressed. 2828 04:06:22,070 --> 04:06:24,770 And I don't recall if it came to us or not, 2829 04:06:24,990 --> 04:06:28,490 just what's staff, but if you could just elaborate on what happened to that. 2830 04:06:29,310 --> 04:06:29,570 Yes. 2831 04:06:30,330 --> 04:06:31,170 Thank you, Mr. Rumors. 2832 04:06:31,430 --> 04:06:33,070 Angela Scalesoge and Board staff. 2833 04:06:34,150 --> 04:06:39,530 The, so we do have a copy of the December 2017 request that was submitted by MBK, 2834 04:06:39,710 --> 04:06:42,830 we're asking for an emergency authorization to proceed. 2835 04:06:44,530 --> 04:06:46,750 You know, I was not present at that time, 2836 04:06:46,750 --> 04:06:54,230 we don't have any records that that was actually granted or processed, so not sure where the 2837 04:06:54,230 --> 04:06:59,390 what happened with that request, but that request was submitted to our office, but it was never 2838 04:06:59,390 --> 04:07:06,570 responded to or confirmed as a deemed it an emergency to allow it to perceive as an emergency action. 2839 04:07:09,220 --> 04:07:09,920 Thank you. 2840 04:07:11,240 --> 04:07:11,960 I 2841 04:07:18,110 --> 04:07:32,390 think this is the staff and maybe to Mr. Meyer what has been done out there to respond to any of these since Mr. 2842 04:07:32,430 --> 04:07:37,370 Meyer acquired the property or maybe I'm not pretty precise about the date. 2843 04:07:37,870 --> 04:07:40,230 But we're he's on this property for five months. 2844 04:07:40,570 --> 04:07:43,880 What has happened out there? 2845 04:07:43,880 --> 04:07:50,280 say again to quite please. Mr. Mire has owned the property for five months. There's been 2846 04:07:50,280 --> 04:07:56,080 this long dialogue with the prior owner and now with Mr. Mire. Correct. What has changed 2847 04:07:56,080 --> 04:08:02,900 on the property since Mr. Mire acquired the property relative to what the staff has been 2848 04:08:02,900 --> 04:08:03,900 set. 2849 04:08:07,080 --> 04:08:10,300 The two-on authorized structures have been removed. 2850 04:08:13,380 --> 04:08:16,100 The number. That's probably a good thing, 2851 04:08:16,100 --> 04:08:17,660 Right, that's a good thing. 2852 04:08:20,040 --> 04:08:24,780 And the name change, yes, the name change of applications 2853 04:08:24,780 --> 04:08:29,540 were submitted at October 7th, as part of his response 2854 04:08:29,540 --> 04:08:30,940 to the newest violation. 2855 04:08:33,040 --> 04:08:35,320 When Mr. Meyer moved into the property, 2856 04:08:36,900 --> 04:08:39,380 he brought a lot of vehicles, a lot of his belongings. 2857 04:08:40,520 --> 04:08:42,520 They were on the lower water site berm 2858 04:08:42,520 --> 04:08:45,140 on the south part of the property. 2859 04:08:46,360 --> 04:08:48,760 He's since moved a lot of that material out. 2860 04:08:48,840 --> 04:08:50,080 There's still some there. 2861 04:08:50,620 --> 04:08:53,360 However, that's not on the northern property that 2862 04:08:53,360 --> 04:08:55,040 is not owned by a Mr. Migra. 2863 04:08:55,240 --> 04:08:59,320 It's owned by a relative of Missy and Mr. Chiang. 2864 04:09:02,140 --> 04:09:05,300 The property erosion has seemed to stabilize. 2865 04:09:05,900 --> 04:09:08,700 Had to go out there many times over the past couple years 2866 04:09:08,700 --> 04:09:09,500 to look at it. 2867 04:09:09,500 --> 04:09:16,160 It seems to have stabilized to where it's at now, but it did get a little worse when after 2868 04:09:16,160 --> 04:09:19,640 I first initially saw it in 2017. 2869 04:09:25,230 --> 04:09:31,870 I can tell you that the Sacramento County Building Department did at the time when the 2870 04:09:31,870 --> 04:09:37,450 this erosion happened, did issue a occupancy restriction for this property for only daytime 2871 04:09:37,450 --> 04:09:38,490 occupancy. 2872 04:09:38,490 --> 04:09:48,610 And that was imposed on the Yees, my last check with Sacramento County on about that is that that restriction still applies to this day. 2873 04:09:55,430 --> 04:09:59,050 So, maybe if I could ask Mr. Meyer, if you would. 2874 04:10:00,000 --> 04:10:07,040 At correct, or would you add or subtract anything to that? Yeah, I'll add a few things. First of all, 2875 04:10:09,880 --> 04:10:20,200 and completely capable of engaging people without skill and equipment to repair the river bank. I have said, I'll do it. 2876 04:10:21,280 --> 04:10:26,120 It's trying to answer my question rather than what is your specific question? 2877 04:10:26,300 --> 04:10:30,560 The question is, you've owned this property for something on the order of five months. 2878 04:10:31,900 --> 04:10:37,860 There's been a dialogue between the prior owners and the board staff about the property. 2879 04:10:38,140 --> 04:10:41,220 There's been a dialogue between the board staff and you. 2880 04:10:41,280 --> 04:10:48,180 My question was, what has changed on the property in the last five months since you've owned it? 2881 04:10:48,180 --> 04:10:52,920 Okay, specifically, but it requires an additional comment, specifically, all of the shrubbery 2882 04:10:52,920 --> 04:11:00,100 and bushes that were between the fogline of the road and the fences of the property, 2883 04:11:00,260 --> 04:11:01,380 to the front of the property. 2884 04:11:02,020 --> 04:11:03,660 Those were an issue of violation. 2885 04:11:03,900 --> 04:11:07,700 It's all been trimmed, the trees, overhangs, are all taken care of. 2886 04:11:10,040 --> 04:11:15,860 I could not do the river bank because I don't have a permission from the Central Valley. 2887 04:11:15,860 --> 04:11:18,120 So I have been working on that. 2888 04:11:18,540 --> 04:11:19,800 I would have had it done by now, 2889 04:11:19,980 --> 04:11:21,500 or had it done in the first month. 2890 04:11:22,620 --> 04:11:24,040 The other issue at hand, 2891 04:11:24,120 --> 04:11:25,860 all these things from the past, 2892 04:11:27,940 --> 04:11:30,160 some pond that was there. 2893 04:11:30,540 --> 04:11:32,180 It was gone long before I came. 2894 04:11:32,320 --> 04:11:33,620 I didn't do it. 2895 04:11:33,820 --> 04:11:35,200 Plants that were there. 2896 04:11:35,540 --> 04:11:36,940 They were gone long before I came. 2897 04:11:37,040 --> 04:11:37,700 They're not there. 2898 04:11:37,780 --> 04:11:38,920 There's nothing to fix. 2899 04:11:40,120 --> 04:11:41,700 The sidewalk that's there, 2900 04:11:41,700 --> 04:11:42,900 I call it the building department. 2901 04:11:43,140 --> 04:11:45,540 And I said central valley's trying to tell me 2902 04:11:45,540 --> 04:11:50,520 that that sidewalk along the edge cannot be there, because it doesn't have a permit. 2903 04:11:51,120 --> 04:11:57,140 And I was told by the building department, you do not need a permit for a, I forget 2904 04:11:57,140 --> 04:12:02,440 the exact term, but for something that covers the surface of the soil, that is not 2905 04:12:02,440 --> 04:12:03,040 load bearing. 2906 04:12:03,160 --> 04:12:07,620 If it was a driveway, it would have to have a permit, but because it's a sidewalk, you 2907 04:12:07,620 --> 04:12:08,600 have to have a permit. 2908 04:12:08,760 --> 04:12:09,420 So it was built. 2909 04:12:09,680 --> 04:12:10,600 So it's not in violation. 2910 04:12:11,900 --> 04:12:12,460 I don't know. 2911 04:12:12,780 --> 04:12:13,800 I don't know. 2912 04:12:13,800 --> 04:12:18,660 They're not talking about a board permit, an encroachment permit. 2913 04:12:18,980 --> 04:12:20,820 They're talking about a building permit. 2914 04:12:21,680 --> 04:12:22,840 See, this is my problem. 2915 04:12:22,960 --> 04:12:23,920 That's my problem, too. 2916 04:12:24,100 --> 04:12:24,980 I don't know these things. 2917 04:12:26,080 --> 04:12:27,020 Listen to me. 2918 04:12:27,220 --> 04:12:28,520 I'm going to 2919 04:12:31,560 --> 04:12:32,160 be honest. 2920 04:12:32,660 --> 04:12:34,280 They in you've admitted it yourself. 2921 04:12:35,540 --> 04:12:36,660 You're a professional. 2922 04:12:37,080 --> 04:12:42,880 You do things for other people of a medical background and so on. 2923 04:12:43,040 --> 04:12:44,180 You've not done this. 2924 04:12:45,940 --> 04:12:53,160 To be honest, and I don't know any other way to say it, and I don't think you know what you're doing. 2925 04:12:53,440 --> 04:12:57,860 I don't know. I don't know what to say that. 2926 04:12:57,880 --> 04:13:08,400 This is a project that probably from my conversation with other engineers is a project that will cost about $2 million. 2927 04:13:08,400 --> 04:13:18,640 And of that $2 million, a half a million is soft costs, engineering costs, geological costs, 2928 04:13:19,000 --> 04:13:22,620 hydrological costs, permitting costs, whatever. 2929 04:13:23,600 --> 04:13:24,860 That's what it takes. 2930 04:13:25,500 --> 04:13:29,520 I don't think you have a clue about that. 2931 04:13:29,780 --> 04:13:36,320 Now what we're trying to say, and maybe John hasn't explained it clearly enough, 2932 04:13:36,320 --> 04:13:43,940 is we're less interested in, although we are interested in cleaning up all the old permits 2933 04:13:43,940 --> 04:13:48,500 and all of that stuff that need to be done and you've done some of that. 2934 04:13:49,400 --> 04:13:58,480 We need to be clear on what the target is, what we're trying to achieve, and that takes 2935 04:13:58,480 --> 04:13:59,880 a plan. 2936 04:14:00,340 --> 04:14:00,500 I'm sure. 2937 04:14:00,640 --> 04:14:05,840 What the target is, I'm saying that this is a project that's going to cost you 2938 04:14:05,840 --> 04:14:06,720 about $2 million. 2939 04:14:08,280 --> 04:14:10,700 And, you know, that's just based on experience 2940 04:14:10,700 --> 04:14:12,120 talking to various engineers. 2941 04:14:12,360 --> 04:14:13,960 I'm like you, I'm not an engineer, 2942 04:14:15,060 --> 04:14:17,060 but I, you know, have talked to them. 2943 04:14:17,240 --> 04:14:19,280 And what we need from you, 2944 04:14:20,460 --> 04:14:22,720 he calls it a stabilization plan. 2945 04:14:22,720 --> 04:14:26,100 That would be a subsidiary to what I'm talking about. 2946 04:14:26,460 --> 04:14:29,940 I'm talking an overall plan for the property 2947 04:14:29,940 --> 04:14:35,000 that includes a neurology, real estate, 2948 04:14:37,100 --> 04:14:43,600 Stabilization work, all of those things included in that plan, and the plan is probably 2949 04:14:43,600 --> 04:14:46,660 cost you a couple of hundred thousand dollars. 2950 04:14:47,400 --> 04:14:50,600 Now are you prepared to do that? 2951 04:14:50,680 --> 04:14:56,500 What we've been talking about so far are little tasks taking out bushes, cleaning up 2952 04:14:56,500 --> 04:14:59,360 that's not that's that's that's that's that's they're insignificant 2953 04:15:01,740 --> 04:15:08,820 We need to be on the same page as far as what the target is. What you're trying to do here? 2954 04:15:09,080 --> 04:15:15,800 Well, the only thing is, and it's going to cost you a lot of money, and I don't think you're prepared to pay for it, and I don't think we're talking target here. 2955 04:15:16,240 --> 04:15:28,240 What about liability? Why hasn't anybody done something to determine who did the damage? Is it because there were a couple of plants growing on the soil? What is it? Was it the river? 2956 04:15:28,780 --> 04:15:30,360 I don't care about that. 2957 04:15:30,580 --> 04:15:32,140 I do, because that's the liability, 2958 04:15:32,520 --> 04:15:36,620 who does what I think or what I care about is knowingly, 2959 04:15:36,840 --> 04:15:38,600 you came in, you put just the property, 2960 04:15:38,900 --> 04:15:40,440 you knew that had problems, 2961 04:15:41,100 --> 04:15:43,100 you knew you were gonna have to spend 2962 04:15:43,100 --> 04:15:44,760 some money getting it squared away, 2963 04:15:45,500 --> 04:15:49,800 but we have yet to see what conceptually, 2964 04:15:51,420 --> 04:15:54,240 overall you plan to do with the property. 2965 04:15:55,040 --> 04:15:55,940 That's what we need, 2966 04:15:56,240 --> 04:15:57,940 and it's gonna cost you some money to get it. 2967 04:15:57,940 --> 04:16:00,140 I can't do it for you, it's very true. 2968 04:16:00,140 --> 04:16:04,760 It's an ear, probably could do it for you, David, but it's going to cost you some money. 2969 04:16:06,120 --> 04:16:08,280 Well, there's many ways of approaching things. 2970 04:16:08,620 --> 04:16:09,480 I developed it. 2971 04:16:10,120 --> 04:16:13,640 Yeah, I know there are, but that's not the way it's done here. 2972 04:16:14,000 --> 04:16:19,520 Well, I'd like to come to a reasonable and equitable pathway here to resolve this. 2973 04:16:19,740 --> 04:16:21,360 I'm not spending $2 million. 2974 04:16:22,240 --> 04:16:24,920 I can fix the property for much, much less. 2975 04:16:24,920 --> 04:16:27,400 And I can get an engineering certified plan. 2976 04:16:27,640 --> 04:16:30,820 However, you seem to just dust under the table, 2977 04:16:30,820 --> 04:16:31,580 who did this? 2978 04:16:31,580 --> 04:16:32,240 Who's liable? 2979 04:16:32,600 --> 04:16:36,060 The water department is liable and I intend to prove it. 2980 04:16:36,580 --> 04:16:39,060 And in the meantime, I'm going to put a hold on everything here, 2981 04:16:39,060 --> 04:16:39,680 if I can. 2982 04:16:40,240 --> 04:16:41,520 It doesn't matter. 2983 04:16:42,120 --> 04:16:46,780 What matters is you're given due notice of what the problems 2984 04:16:46,780 --> 04:16:48,020 with the property are. 2985 04:16:48,340 --> 04:16:50,680 You were totally aware of it. 2986 04:16:50,680 --> 04:16:54,900 And you're coming in trying to do this on a task. 2987 04:16:54,900 --> 04:17:06,480 by task basis. We don't work that way. We can't. This is a project that's, you know, has 2988 04:17:06,480 --> 04:17:12,940 some real problems. John Tyson alluded to it, it may have been the other owner. I don't know, 2989 04:17:13,000 --> 04:17:23,040 but you were put on notice that this problem has property. Now, the way we work here is that we 2990 04:17:23,040 --> 04:17:26,940 I'm not going to make up this, make it up as we go long. 2991 04:17:27,200 --> 04:17:28,220 We don't work that way. 2992 04:17:29,360 --> 04:17:31,740 And I think that's the misunderstanding here. 2993 04:17:32,020 --> 04:17:32,760 I think we're possible. 2994 04:17:33,300 --> 04:17:44,620 You've got to make a decision whether we're going to work together or not, but the first thing is, you've got to tell us what you're trying to do. 2995 04:17:44,620 --> 04:17:51,000 Okay, you want us could do a ABCD conclusion. You want a stabilization plan signed by an engineer. 2996 04:17:51,960 --> 04:17:59,320 I went to MBK. They did, uh, what's your name? Angelace said, 2997 04:17:59,820 --> 04:18:04,820 it wasn't a stabilization plan, but he even asks for a permit to do the emergency work. 2998 04:18:05,560 --> 04:18:11,320 Okay, so if it was deficient, simply say, we need a site plan, we need to this plan, 2999 04:18:11,320 --> 04:18:17,060 need of that plan, and then it will be effective instead of saying, out the door, we're not going 3000 04:18:17,060 --> 04:18:21,640 to look at it. You didn't do it right. Goodbye. That's how it's been in the whole way through. So, 3001 04:18:21,840 --> 04:18:30,100 it isn't step by step. It is logical. You evaluate and then you begin to design a plan to produce. 3002 04:18:30,240 --> 04:18:35,900 So, I called to my SNW, decided he'd come over January 10th and evaluate, and they wouldn't even 3003 04:18:35,900 --> 04:18:40,360 let him get out the door. They say, oh, you don't have a whole engineering thing, hydrology report. 3004 04:18:40,360 --> 04:18:49,040 We would have had it, but we weren't going to do it until we needed to do it by the definition of the engineer who was going to come and do that on January 10th. 3005 04:18:49,040 --> 04:18:54,440 You never came because I told him we can't work with John, tell me what you want. 3006 04:18:54,640 --> 04:18:56,820 Let's go. Let's go. Let's go. Let's go. Let's go. 3007 04:18:56,820 --> 04:19:05,240 I thought I just did. I thought I just did. You're telling me you want a plan. Stabilization plan. 3008 04:19:05,240 --> 04:19:09,520 And then you want to know how the overall property will be repaired. 3009 04:19:10,280 --> 04:19:17,580 The only question that I have to put into that equation, again, is why am I paying for it when I'm not liable? 3010 04:19:18,040 --> 04:19:20,660 Liability in law is a big issue. 3011 04:19:21,140 --> 04:19:22,700 This is going nowhere. 3012 04:19:22,920 --> 04:19:23,200 Bernie? 3013 04:19:23,620 --> 04:19:24,560 This is going nowhere. 3014 04:19:25,160 --> 04:19:25,620 Mr. Armstrong. 3015 04:19:25,720 --> 04:19:29,960 Tell me what you want, because I can't work with being shut down. 3016 04:19:30,160 --> 04:19:31,880 I really didn't. 3017 04:19:32,020 --> 04:19:32,760 You really didn't. 3018 04:19:32,760 --> 04:19:33,640 Oh, I'm sorry. 3019 04:19:34,400 --> 04:19:35,020 You and I are. 3020 04:19:35,020 --> 04:19:42,120 I think I understand the concern as far as knowing projection, 3021 04:19:42,340 --> 04:19:44,720 what is the intentions of the property itself, right? 3022 04:19:46,300 --> 04:19:48,480 And it's addressed to the immediate concerns 3023 04:19:48,480 --> 04:19:50,840 as far as the erosion and stuff like that, 3024 04:19:51,120 --> 04:19:53,260 which I believe is subsequent to an engineer 3025 04:19:53,260 --> 04:19:55,800 actually analyzing it with intelligence that's needed 3026 04:19:55,800 --> 04:19:59,260 for your guy's requirements to assess what, 3027 04:19:59,260 --> 04:19:59,460 . 3028 04:20:00,540 --> 04:20:06,860 Repairs is needed outside of what his plans are, right? Because he made decide to put a circus there or something, right? 3029 04:20:07,760 --> 04:20:09,220 I'm just, I'm just signing up. 3030 04:20:09,240 --> 04:20:15,140 Depending on his plans, he can develop what's appropriate for, in addition to the repairs that you guys are seeking, correct? 3031 04:20:15,700 --> 04:20:24,920 So my, my thing is that if, if the prosecution is willing to allow the Woodland engineer to evaluate this, assess it, 3032 04:20:24,920 --> 04:20:29,600 Because the notice to give into him was like we're not going to accept this person. 3033 04:20:30,200 --> 04:20:33,940 And that's where he was like, if they're not going to accept this engineer, this engineer 3034 04:20:33,940 --> 04:20:38,640 coming to assess the property and to develop the stabilization plan, it kind of was a 3035 04:20:38,640 --> 04:20:39,200 mute point. 3036 04:20:39,340 --> 04:20:43,140 And that's where the resistance I felt was miscommunicated to allow the progress. 3037 04:20:43,340 --> 04:20:47,940 The two guys are looking for as far as the repair of the property and the erosion. 3038 04:20:48,980 --> 04:20:50,820 Am I in the ballpark or? 3039 04:20:50,820 --> 04:20:55,060 Well, I don't think our staff vetoed it in Geneva, 3040 04:20:55,320 --> 04:20:56,980 at least I hope they didn't. 3041 04:20:57,520 --> 04:20:59,780 That's where, I don't know he's not. 3042 04:21:00,300 --> 04:21:02,940 I know, I know, but in certain things can be blown up 3043 04:21:02,940 --> 04:21:06,320 especially when you feel, yeah, I think we're Mr. 3044 04:21:06,540 --> 04:21:10,280 Meyer and I start getting sideways here. 3045 04:21:10,520 --> 04:21:14,240 Is we want to know what's going on overall 3046 04:21:14,900 --> 04:21:19,200 and have the engineering, the Gatech, all of that confirmed 3047 04:21:19,200 --> 04:21:26,820 So we know it can it's possible to do it and it's going to be a I tell you it's going to be a big number 3048 04:21:26,820 --> 04:21:32,740 He doesn't think so it will be right and that's where if given the opportunity he will comply 3049 04:21:32,740 --> 04:21:35,440 I don't make that decision that yeah, it's too high 3050 04:21:35,440 --> 04:21:41,580 But at least allow in that opportunity to do so that's my thing is that that opportunity doesn't seem to be a present 3051 04:21:42,640 --> 04:21:44,000 Okay, is your brother? 3052 04:21:50,960 --> 04:22:02,300 I'm really confused. The only, the board staff asked for an engineer's report on stabilizing the bank. 3053 04:22:03,000 --> 04:22:12,560 And that's all it needed to be done to comply was to provide that plan and then a discussion of how you're going to implement that plan. 3054 04:22:12,560 --> 04:22:22,680 You haven't heard you say that you've had an engineer's report on how to stabilize the bank and you haven't submitted it to the staff. 3055 04:22:23,680 --> 04:22:24,880 Why not? 3056 04:22:24,940 --> 04:22:33,620 The communication with the staff was that they did the show progress and in that progress was to get into contract with the engineer to establish that. 3057 04:22:33,800 --> 04:22:39,040 When he entered into a contract whether it was to their purview of level, it wasn't communicated. 3058 04:22:39,040 --> 04:22:49,660 And that's where there's a void of vagueness that was established when he entered in contract with this engineer to review the site and get things going because of the backlog of engineers. 3059 04:22:50,360 --> 04:22:53,120 He wasn't available till January 10th. 3060 04:22:53,160 --> 04:23:00,020 When he submitted saying, hey, I got to engineer his in contract. He's going to review it. The sentence to him, he says, we're not going to accept that. That's what was presented to him. 3061 04:23:00,140 --> 04:23:01,460 He was like, well, what do I do? 3062 04:23:01,460 --> 04:23:04,920 And that's where I felt it may have been not 3063 04:23:04,920 --> 04:23:11,120 been clear to Mr. the respondent of what his intentions were like, 3064 04:23:11,900 --> 04:23:15,120 okay, continue on and produce this, something's that effect, 3065 04:23:15,260 --> 04:23:20,860 but just to say no, we're not accepting that effort is kind of misleading. 3066 04:23:21,560 --> 04:23:23,300 To what your guys' intentions are presented today. 3067 04:23:23,800 --> 04:23:30,840 I would say it would be unheard of that the staff would say that registered engineers, 3068 04:23:30,840 --> 04:23:35,900 not acceptable to us. If that happened, I would like to hear from staff why. 3069 04:23:43,410 --> 04:23:50,070 They interpreted my contract as if it was just a sight review. It was not just a sight review. 3070 04:23:50,710 --> 04:23:55,970 It was sort of like come over and we'll look at the place. He didn't even see the property before. 3071 04:23:56,390 --> 04:23:59,870 Come over and let's look this over and I'll see, evaluate it, let's talk about it, 3072 04:23:59,870 --> 04:24:03,770 and then we'll decide what we're going to do first. How we're going to come up with drawings. 3073 04:24:04,190 --> 04:24:06,430 If you got to do hydrology, we were going to do that. 3074 04:24:07,130 --> 04:24:15,730 And, instead of John saying, well, thank you for your initial effort showing us that you're getting an engineer on board, what are you going to do from here out of it? You didn't do that. 3075 04:24:16,110 --> 04:24:19,230 He just said, door closed. No good. You didn't do it right. 3076 04:24:20,610 --> 04:24:26,530 Again, would you take your car in and say to somebody, here's a blind check. Let me know how it goes. 3077 04:24:26,830 --> 04:24:35,690 When you say, tell me the problem, tell me what's involved, where the parts, what's the labor, and if you don't want to fix it, you push the car out and a ditch and give it to the 3078 04:24:35,690 --> 04:24:43,410 The way I understood you to say is that you had your engineer come over to the site to look at him. 3079 04:24:43,530 --> 04:24:43,890 He wasn't. 3080 04:24:44,130 --> 04:24:47,150 Well, let's what you wanted to have happened. 3081 04:24:47,530 --> 04:24:51,030 To have him come over and lies the site, see the site. 3082 04:24:51,310 --> 04:24:55,730 And then go back and give you an estimate of what the plan would be. 3083 04:24:55,870 --> 04:24:57,150 And you could say yes or no. 3084 04:24:57,310 --> 04:24:59,030 Most attorneys, for example, you call him up. 3085 04:25:02,120 --> 04:25:16,000 I understand that. I don't think the staff vetoed the engineer. No, they didn't veto the engineer. They vetoed that that was an inadequate maneuver. They wanted a complete stabilization plan. 3086 04:25:16,620 --> 04:25:22,480 Well, they do too, but I'm not going to get it on day one and I can't get it if the guy's on vacation for. 3087 04:25:23,780 --> 04:25:25,640 I'm not a hard guy to get along with. 3088 04:25:25,780 --> 04:25:27,520 I want to do this and I, you want it fixed. 3089 04:25:27,940 --> 04:25:31,880 I am going to proceed and find the liability issue resolved. 3090 04:25:33,160 --> 04:25:35,900 But I'll go ahead and get it done if you let me. 3091 04:25:36,300 --> 04:25:42,580 But again, like John said, well, Mr. Meyer contacted us three, four months ago and you're 3092 04:25:42,580 --> 04:25:43,780 just, we're going to give him three weeks. 3093 04:25:44,040 --> 04:25:44,520 Come on, man. 3094 04:25:44,780 --> 04:25:45,640 I got stuff to do. 3095 04:25:45,740 --> 04:25:47,200 You got stuff to do three weeks. 3096 04:25:47,420 --> 04:25:50,280 I can't even call up anybody and get him over in three weeks. 3097 04:25:50,280 --> 04:25:54,320 So, if it's right now, it looks like this is a mild year. 3098 04:25:54,680 --> 04:25:57,480 John told me in a conversation just a few minutes ago, 3099 04:25:58,200 --> 04:26:00,700 put some bisqueen out there, put some sandbags, 3100 04:26:00,760 --> 04:26:04,540 I suggested on top to hold it so that there won't be any more erosion. 3101 04:26:05,200 --> 04:26:07,920 Let's take a few months, let me get you an engineer, 3102 04:26:08,560 --> 04:26:10,340 signed off stabilization plan, 3103 04:26:10,780 --> 04:26:14,200 and then who determines, who does the work, that's my game. 3104 04:26:14,680 --> 04:26:18,240 If I want to hire 16 illegal from Guatemala, 3105 04:26:18,240 --> 04:26:20,580 Well, I don't care. That's my job. 3106 04:26:20,640 --> 04:26:22,840 But I'll get it done. Please don't. 3107 04:26:24,060 --> 04:26:27,540 Anyway, I'm just trying to be lighthearted because this is serious. 3108 04:26:28,100 --> 04:26:31,720 Honestly, in the paperwork, it says right in there. 3109 04:26:31,780 --> 04:26:34,660 Even clear back to 2018, Paul Devaro. 3110 04:26:35,560 --> 04:26:38,040 Oh, well, my hat to remove the house. 3111 04:26:38,580 --> 04:26:40,540 What? Come on. 3112 04:26:42,100 --> 04:26:42,580 Okay, 3113 04:26:45,420 --> 04:26:47,640 let's, Sarah, you wanted to make a comment. 3114 04:26:47,640 --> 04:26:48,160 But thank you. 3115 04:26:48,160 --> 04:26:53,000 I asked if we could restore order and have the hearing format back so we can try to 3116 04:26:53,000 --> 04:26:54,020 resolve this. 3117 04:26:54,020 --> 04:27:02,860 If I could make a quick point or two, the notice of violation was issued in 2018. 3118 04:27:03,920 --> 04:27:10,180 Mr. Meyer was provided with a copy of that when he was looking at the property in May. 3119 04:27:10,180 --> 04:27:16,820 And that, notice a violation said, submit a plan with a project schedule, et cetera. 3120 04:27:18,040 --> 04:27:24,480 When the board issued the cease and desist order in November, it adopted that NOV. 3121 04:27:25,120 --> 04:27:32,040 In other words, that has always been what was required, submit a plan with a project schedule, 3122 04:27:32,740 --> 04:27:38,260 et cetera, prepared by a California Registry Professional Engineer, and submit a plan with 3123 04:27:38,260 --> 04:27:39,520 project schedule, 3124 04:27:41,840 --> 04:27:44,540 it's a name change application that said a rest. 3125 04:27:45,000 --> 04:27:50,040 So this is never, this is not a brand new thing and it's not like we're 3126 04:27:50,040 --> 04:27:54,500 springing, there's staff has been springing anything on Mr. Myers or not. 3127 04:27:54,980 --> 04:28:02,160 The reason that staff rejected his submission in December was because it did not do 3128 04:28:02,160 --> 04:28:02,480 that. 3129 04:28:02,720 --> 04:28:04,680 It did not submit a stabilization plan. 3130 04:28:04,680 --> 04:28:11,120 That's what Jill was saying, and so far, and that's what we're interested in, Clyde. 3131 04:28:11,500 --> 04:28:13,580 Yeah, I'd like to sort 3132 04:28:18,950 --> 04:28:24,090 of, I'd like to put this in some perspective of kind of what we do, 3133 04:28:24,750 --> 04:28:28,230 and what the Department of Water Resources and Orville Dam is all about. 3134 04:28:28,370 --> 04:28:30,510 I'd like to just put that in perspective. 3135 04:28:33,210 --> 04:28:35,090 This is the flood board. 3136 04:28:35,090 --> 04:28:42,190 this is the levee board. Our job is to protect the levees. Our job is to protect all 3137 04:28:42,190 --> 04:28:46,590 those people behind the levee, all the people in your area, all the people out in 3138 04:28:46,590 --> 04:28:54,970 Thomas. So, this property was allowed to be developed, but there were conditions on it. 3139 04:28:55,070 --> 04:28:58,570 You have to get, you want to do things, you have to get permit for them. It's not like living 3140 04:28:58,570 --> 04:29:03,930 in the city where you want to put in some concrete patio. You can do that without a permit. 3141 04:29:04,490 --> 04:29:05,470 You know, you don't need that. 3142 04:29:05,590 --> 04:29:06,450 You want to do it on the levy? 3143 04:29:06,650 --> 04:29:07,550 You got to have a permit. 3144 04:29:07,650 --> 04:29:10,190 You got to do that because people have to. 3145 04:29:10,270 --> 04:29:15,150 So when you come and you get a permit, you get a permit from us and you get approval from 3146 04:29:15,150 --> 04:29:15,930 the core of engineers. 3147 04:29:16,210 --> 04:29:18,370 The federal or federal partner and us. 3148 04:29:18,950 --> 04:29:23,690 So the thing that we're concerned about is I look at the levy out there and look at the 3149 04:29:23,690 --> 04:29:24,050 pictures. 3150 04:29:24,230 --> 04:29:25,210 I have not been on the site. 3151 04:29:25,230 --> 04:29:28,990 I look at the pictures and I go, well, that's got looks like it's got a lot of sand 3152 04:29:28,990 --> 04:29:30,790 in that levy. 3153 04:29:30,790 --> 04:29:34,750 And as we all know, sand is very erotable. 3154 04:29:35,870 --> 04:29:40,070 And so high water comes along and it might further erode that property. 3155 04:29:40,470 --> 04:29:43,130 And then maybe that threatens the house. 3156 04:29:43,170 --> 04:29:44,730 Maybe the house falls in the river. 3157 04:29:44,830 --> 04:29:49,370 That goes down and jams up the bridge and that causes water back up. 3158 04:29:49,630 --> 04:29:50,810 And it's kind of one of these things. 3159 04:29:51,890 --> 04:29:55,310 Or we get an erosion side and it starts to peel off the levy. 3160 04:29:56,370 --> 04:29:59,710 So our concern here is to protect. 3161 04:29:59,710 --> 04:29:59,990 Thanks for watching, and I'll see you in the next video. 3162 04:30:00,020 --> 04:30:06,360 The levy and the levy system, and all of that that goes with that. 3163 04:30:08,580 --> 04:30:16,320 Now, so we want it stabilized, and you want it stabilized, so that it doesn't take out the house, 3164 04:30:16,460 --> 04:30:18,440 doesn't make the house, doesn't fall in the river, and it doesn't go. 3165 04:30:19,020 --> 04:30:24,820 You need one, we need one, and you want to do it relatively, you know, appropriately and quickly. 3166 04:30:24,820 --> 04:30:35,120 The issue of oraville dam and causing if you want to litigate, if you want to litigate against them, 3167 04:30:35,860 --> 04:30:39,520 let's see, is that going to get resolved by June? 3168 04:30:40,520 --> 04:30:44,760 Now, is it going to get resolved by the June of your following? 3169 04:30:45,540 --> 04:30:47,300 Who knows? Might be five years? 3170 04:30:51,140 --> 04:30:57,920 So, it's going to take a long time. And if we have to wait for that to be resolved, that's 3171 04:30:57,920 --> 04:31:03,940 between you and the department, it's going to take a long time and the house may not be there 3172 04:31:03,940 --> 04:31:11,960 then. Okay, so if there are separate issues, we can't wait for, you know, some resolution 3173 04:31:11,960 --> 04:31:16,700 of who is liable for this, this needs to get fixed to protect all the people behind the 3174 04:31:16,700 --> 04:31:23,440 that's the point. You're very wise and you articulate effectively. Mr. Edgar does too. 3175 04:31:24,020 --> 04:31:30,120 We're all on the same page. The only bump in the road here is the issue of liability, 3176 04:31:30,660 --> 04:31:35,220 which you don't even want to concern yourselves with. I have already written a lawsuit filed it. 3177 04:31:35,220 --> 04:31:40,140 I got one in federal court naming the Department of Water Resources. You're right. It's going to take 3178 04:31:40,140 --> 04:31:46,080 a while. The class action lawsuit people told me they were supposed to go to trial in January 3179 04:31:46,700 --> 04:31:52,300 And I'm talking about farmers that lost 200 acres of walnut trees and 10 years worth of income, 3180 04:31:52,400 --> 04:31:58,560 $3 million dollars' loss, and the Department of Water Resources got $837 million from FEMA 3181 04:31:58,560 --> 04:32:02,460 to help pay them off and get them gone, and they kept on the money. 3182 04:32:03,160 --> 04:32:07,240 So I know what I'm up against, but I will litigate and I'll get it. 3183 04:32:07,560 --> 04:32:15,160 In the meantime, let me have three months to stabilize, get a stabilization plan. 3184 04:32:15,160 --> 04:32:18,100 I'll try to do it in less if I can do it in two weeks I will. 3185 04:32:18,740 --> 04:32:21,320 Let me get an engineering stabilization plan. 3186 04:32:21,560 --> 04:32:23,320 Do not do anything else. 3187 04:32:23,440 --> 04:32:24,640 Let me work with John. 3188 04:32:24,800 --> 04:32:25,520 I like John. 3189 04:32:26,200 --> 04:32:29,340 And let me come in here under three months. 3190 04:32:29,560 --> 04:32:32,260 We're not going to have any unless we have earthquake. 3191 04:32:32,980 --> 04:32:33,860 Nothing's going to happen. 3192 04:32:34,440 --> 04:32:38,360 It's a little we're already two feet below water level in the river. 3193 04:32:38,580 --> 04:32:40,380 There's no rain in sight. 3194 04:32:40,720 --> 04:32:42,140 A sprinkle Sunday may be. 3195 04:32:42,140 --> 04:32:48,740 So let me have time to get, I will get a complete stabilization plan. 3196 04:32:49,740 --> 04:32:56,040 I'm not going, I guess I don't even know why I'm supposed to give John a copy of my contract with the engineer. 3197 04:32:56,960 --> 04:33:05,240 How the engineer and I work is really not, I just did that as a good faith effort to have him see, I'm hiring a guy. 3198 04:33:05,240 --> 04:33:14,920 But rather, the guy takes, does things in steps, reviews the property, then gets some scientific analysis, and puts it together. 3199 04:33:15,180 --> 04:33:18,500 How we go about getting that stabilization plan is our business. 3200 04:33:19,120 --> 04:33:21,180 You can't give me three weeks. That's ridiculous. 3201 04:33:22,760 --> 04:33:25,260 Even now, I'm a 20-hour day guy. 3202 04:33:25,600 --> 04:33:27,180 I went to bed last night at 8 o'clock. 3203 04:33:27,260 --> 04:33:30,360 I got up at midnight. I had to take a sleeping pill to go to sleep. 3204 04:33:30,360 --> 04:33:33,680 And I've been working on my lawsuit for two months. 3205 04:33:34,060 --> 04:33:37,000 I just filed one in the spirit court here. 3206 04:33:37,260 --> 04:33:39,580 And I'm going to probably pull that. 3207 04:33:39,720 --> 04:33:42,260 I've got the federal lawsuit and an injunction 3208 04:33:43,040 --> 04:33:44,560 to stop everything in everybody. 3209 04:33:45,660 --> 04:33:48,520 So I mean, this you talk about litigation costs 3210 04:33:48,520 --> 04:33:50,060 and every other thing. 3211 04:33:50,320 --> 04:33:52,540 There's, you know, I find me 100,000. 3212 04:33:52,540 --> 04:33:54,800 I might cost you two million in litigation. 3213 04:33:55,100 --> 04:33:56,180 So, us work together. 3214 04:33:56,540 --> 04:33:57,640 I don't hate you. 3215 04:33:57,680 --> 04:33:59,580 I don't, I, you're not, you're not, you're not. 3216 04:33:59,580 --> 04:34:05,500 want to do what you do. Okay, let's let's be clear. Your proposal is if we 3217 04:34:05,500 --> 04:34:09,800 give you three months and I'll have a stable position plan. Wait a minute. We 3218 04:34:09,800 --> 04:34:16,340 give you three months. You will come back here with a and approved or 3219 04:34:16,340 --> 04:34:21,400 recommended stabilization plan with a registered engineer that meets the 3220 04:34:21,400 --> 04:34:25,920 requirements of the board. Yes, I can't say they'll accept it because they 3221 04:34:25,920 --> 04:34:29,040 haven't accepted anything I've done, but I will do it and I'll do it to 3222 04:34:29,040 --> 04:34:32,540 standard. And if they won't accept it, I'll give it to you and you find 3223 04:34:32,540 --> 04:34:44,220 some of you. Well, you're not going to give it to me. But what you can do is work with John 3224 04:34:44,220 --> 04:34:50,640 to make sure the reason he wants to see the contract is we have to do our due diligence to make 3225 04:34:50,640 --> 04:34:55,380 sure the engineers registered engineer and so on. That's the required. Yeah, the guy he knows 3226 04:34:55,380 --> 04:34:59,940 the guy working well. Okay. Okay. All right. But that's. 3227 04:35:00,000 --> 04:35:07,940 That's the reason. We're not trying to torture you. But that's what we need. And as Joe said, we've 3228 04:35:07,940 --> 04:35:13,460 been asking for that. And we haven't been getting a reason you didn't get it. It is because 3229 04:35:13,460 --> 04:35:21,860 of me being sideline without if somebody, let's say I'm marching along here and I'm having 3230 04:35:21,860 --> 04:35:27,660 an engineer come. Great. Nice you're having an engineering come. What are you going to do next? Well, 3231 04:35:27,660 --> 04:35:33,020 he's coming on January 10th and we're hoping to have drawing stabilization plan every other 3232 04:35:33,020 --> 04:35:37,200 thing within three weeks. Then what are you going to do? We're going to do this and that. 3233 04:35:37,720 --> 04:35:43,400 I'm have fallen his leap. But I cannot say I'm not going to write a buying check for 20,000 3234 04:35:43,400 --> 04:35:50,240 bucks to some engineering guy because the flood people are forcing me to come up with a certified 3235 04:35:50,240 --> 04:35:57,640 engineering plan. I'm going to take it a little easy here because well, it's got to be an 3236 04:35:57,640 --> 04:36:01,320 have a contract for 20,000 bucks with an engineer? 3237 04:36:02,540 --> 04:36:03,220 What do you got to have? 3238 04:36:06,980 --> 04:36:08,500 Yeah, we need a stamp plan. 3239 04:36:08,920 --> 04:36:11,340 He needs to put his engineer stamp on it. 3240 04:36:12,380 --> 04:36:14,220 Well, I'm going to get that, but 3241 04:36:18,660 --> 04:36:19,300 you got a job 3242 04:36:19,300 --> 04:36:20,780 ties with the enforcement section. 3243 04:36:21,840 --> 04:36:27,580 What we asked Mr. Meyer to do to possibly avoid getting to this point. 3244 04:36:28,140 --> 04:36:34,420 This season's sister was issued, and affirmed by the board, was to show us substantial 3245 04:36:34,420 --> 04:36:38,080 progress that you're going to comply with the season 3246 04:36:38,080 --> 04:36:41,260 to sister ruling at the board gate. 3247 04:36:41,680 --> 04:36:44,760 And we considered that substantial process progress 3248 04:36:45,090 --> 04:36:49,260 would be a sign contract with the engineering firm 3249 04:36:49,260 --> 04:36:51,680 to produce a stabilization plan. 3250 04:36:52,660 --> 04:36:56,820 What you see on your screens is the detail of the contract 3251 04:36:56,820 --> 04:37:01,220 between log and iron nickel and Mr. Meyer. 3252 04:37:02,020 --> 04:37:08,900 It says, consultant agrees to perform the following scope of services, perform a site visit 3253 04:37:08,900 --> 04:37:15,440 to assess the possible stabilization plans for repair of the levy damage at 79,000,000 3254 04:37:15,440 --> 04:37:18,880 garden highway, not to exceed $2,000. 3255 04:37:20,020 --> 04:37:23,440 We read that and we thought, this is a first site plan. 3256 04:37:23,660 --> 04:37:29,140 This is for a site visit. This is not a stabilization plan. 3257 04:37:29,140 --> 04:37:30,860 That's what it says. 3258 04:37:31,000 --> 04:37:31,720 That's what it says. 3259 04:37:31,780 --> 04:37:34,180 Yeah, that's not what you're after, but you... 3260 04:37:34,180 --> 04:37:39,060 No. That's why we considered it at that point in time when we got this. 3261 04:37:39,340 --> 04:37:42,700 Right before December 23rd, 2019. 3262 04:37:43,280 --> 04:37:47,440 This was not a substantial process, a significant progress, 3263 04:37:47,820 --> 04:37:50,440 to resolution of or compliance with the season 3264 04:37:50,440 --> 04:37:52,300 to sister order that you all affirmed. 3265 04:37:53,580 --> 04:37:57,600 So at that point, we decided to move ahead to this point, 3266 04:37:57,600 --> 04:37:58,340 Here we are today. 3267 04:37:59,120 --> 04:38:02,680 Mr. Taylor, you understand what we're talking about. 3268 04:38:02,680 --> 04:38:08,500 I think that when he submitted the contract, 3269 04:38:09,400 --> 04:38:12,640 it was under the impression that that was the stabilization contract, 3270 04:38:13,220 --> 04:38:15,320 which that was one step towards it, 3271 04:38:15,440 --> 04:38:18,660 which I think was miscommunicated. 3272 04:38:18,900 --> 04:38:20,780 As he responded to him that this is not it, 3273 04:38:20,820 --> 04:38:21,660 and he's like, what do you mean? 3274 04:38:22,120 --> 04:38:24,000 I'm just feeling rejected. 3275 04:38:24,720 --> 04:38:26,500 I see how it was developed and I think it was, 3276 04:38:26,500 --> 04:38:37,160 is a communication gap that cause, can you, what's your opinion of a three month delay 3277 04:38:37,160 --> 04:38:43,740 creating a, to be honest? I don't know what the normal processes for stabilization plan 3278 04:38:43,740 --> 04:38:48,880 you guys probably know what will be appropriate lead time to get something for your own 3279 04:38:48,880 --> 04:38:56,480 projects, that's where I would say he's trying to present a good faith offer to 3280 04:38:56,480 --> 04:38:59,360 give some time for him to produce it. 3281 04:38:59,740 --> 04:39:04,460 We do have an engineer that's been identified and willing to work, which is a good step, and 3282 04:39:04,460 --> 04:39:07,020 it was a lot of effort on the respondent. 3283 04:39:07,400 --> 04:39:13,300 And I think that knowing John's position as far as what he was expecting to receive as a 3284 04:39:13,300 --> 04:39:19,680 contract, that it was a communication gap as far as him just so I'm in process. 3285 04:39:19,920 --> 04:39:23,400 I wanted to let you in the loop, this is my, and this is what the expectation is. 3286 04:39:23,400 --> 04:39:27,900 So that way, people know that, hey, he's serious about getting a result. 3287 04:39:28,700 --> 04:39:36,520 I think goodwill is there, it's just a matter of taking off whatever assumptions were made, 3288 04:39:37,020 --> 04:39:38,740 and sitting down, okay, this is the guidelines. 3289 04:39:39,360 --> 04:39:44,900 And likewise, when it comes to stabilization plan, that there should be some due, some expectation 3290 04:39:44,900 --> 04:39:45,420 of due. 3291 04:39:45,480 --> 04:39:47,840 And that's where it's not clear when is this due? 3292 04:39:47,840 --> 04:39:49,580 Is it due in 48 hours? 3293 04:39:49,580 --> 04:39:53,280 is to do when is the expectations met by the prosecution 3294 04:39:53,280 --> 04:39:54,240 it was not established. 3295 04:39:54,800 --> 04:39:57,580 And that I think added to a bit of confusion 3296 04:39:57,580 --> 04:39:59,980 with go how long's it take to do one of these. 3297 04:40:00,000 --> 04:40:02,660 Well, it's never going to happen in three months. 3298 04:40:04,900 --> 04:40:09,300 But the fact that before he bought the property, he had noticed that this was needed. 3299 04:40:10,000 --> 04:40:17,000 It's sort of ridiculous that this point and say, well, how? I didn't know one of my going to do it. 3300 04:40:17,800 --> 04:40:22,220 You knew before he bought the property, and there's been no action toward the report. 3301 04:40:22,980 --> 04:40:26,140 That action towards the report is evident that he 3302 04:40:26,140 --> 04:40:30,000 injured into consulting with an engineer as prescribed by the sealed. 3303 04:40:30,440 --> 04:40:34,360 And I think that itself is should be reflected in your statement. 3304 04:40:35,440 --> 04:40:37,820 The effort is there, and the intentions are there. 3305 04:40:38,200 --> 04:40:41,700 Guidance is not something he has experienced in. 3306 04:40:42,860 --> 04:40:46,220 And he is looking for, and it seems like John is willing to say, 3307 04:40:46,620 --> 04:40:49,760 okay, these are the steps we're expecting in three weeks to have. 3308 04:40:49,760 --> 04:40:52,700 at least this level completed by this engineer, 3309 04:40:52,820 --> 04:40:55,200 something to that effect, it gives him some guidance to say, 3310 04:40:55,660 --> 04:40:59,500 okay, he's just, I give, I commend him just finding 3311 04:40:59,500 --> 04:41:02,360 somebody based off of what you guys experienced earlier 3312 04:41:02,360 --> 04:41:04,340 today as far as the needs of the state 3313 04:41:04,340 --> 04:41:07,480 and finding credible engineers to resolve issues 3314 04:41:07,480 --> 04:41:10,500 as far as this and create a budget and plan stuff like that. 3315 04:41:10,720 --> 04:41:15,280 So, how much does a stabilization study usually cost? 3316 04:41:16,440 --> 04:41:25,680 You know, I'm not going to offer, no, I mean, it would be substantial cost. 3317 04:41:26,520 --> 04:41:31,300 It's not going to be a $5,000 contract, they'll come up with this plan, so you know, 3318 04:41:32,180 --> 04:41:35,000 you're, you're, for sure, talking more than $50,000. 3319 04:41:36,720 --> 04:41:38,100 So, uh, yeah. 3320 04:41:38,500 --> 04:41:38,680 Yeah. 3321 04:41:38,920 --> 04:41:42,720 And we appreciate that feedback, because that way, allow us, in negotiation with the 3322 04:41:42,720 --> 04:41:46,340 to make sure that it's a fair, not in a way to make it. 3323 04:41:46,340 --> 04:41:50,120 Wait a minute, we've got some board members who want to talk here. 3324 04:41:51,080 --> 04:41:51,240 Jane. 3325 04:41:56,360 --> 04:42:05,180 You know, I really am trying very hard to appreciate that board members and others are trying 3326 04:42:05,180 --> 04:42:13,140 to provide a tutorial for a property owner who has responsibilities to repair violations on 3327 04:42:13,140 --> 04:42:13,700 his property. 3328 04:42:14,820 --> 04:42:23,170 And I keep coming back to our responsibility, and now I see it as a board member of this 3329 04:42:23,170 --> 04:42:23,850 ANC. 3330 04:42:24,490 --> 04:42:29,870 Is that we are to determine if something needs to be done. 3331 04:42:31,130 --> 04:42:35,430 And, well, I understand this property owner is confused. 3332 04:42:35,730 --> 04:42:38,010 I don't think we caused a confusion. 3333 04:42:39,130 --> 04:42:42,870 And I look at all of this information that's been provided. 3334 04:42:42,870 --> 04:42:48,330 And what we've heard in reading transcripts, from 2018, of course, 3335 04:42:48,610 --> 04:42:56,850 funds to award hearing in 2019 to now 2020, I come to these questions. 3336 04:42:57,630 --> 04:43:02,610 Devilations on this property exist that are potentially dangerous to the State 3337 04:43:02,610 --> 04:43:10,710 Planet Flood Control, and I say, yes, has the property owner been appropriately notified, 3338 04:43:10,710 --> 04:43:17,530 And I say yes many times, even in his response, he provides attachments of the two notices 3339 04:43:17,530 --> 04:43:21,390 that he received that very clearly indicate what needs to be done. 3340 04:43:22,190 --> 04:43:27,310 Not exactly how, not exactly who's supposed to do it, and not how much money he's supposed 3341 04:43:27,310 --> 04:43:34,770 to spend, but what needs to be done to correct the violations is that the action I think 3342 04:43:34,770 --> 04:43:40,370 is specified to the extent that a public entity needs to appropriately provide it to a private 3343 04:43:40,370 --> 04:43:43,410 property owner for his private property. 3344 04:43:44,850 --> 04:43:47,090 And I think that that should be corrected. 3345 04:43:47,290 --> 04:43:49,090 And I think the way that they will be corrected 3346 04:43:49,090 --> 04:43:50,810 is to adopt a force in order. 3347 04:43:52,270 --> 04:43:54,270 And if you want to listen to the other board members, 3348 04:43:55,010 --> 04:43:56,610 you obviously can do that and should, 3349 04:43:56,750 --> 04:43:58,490 but that's the motion that I'm prepared to make. 3350 04:44:00,230 --> 04:44:03,310 Tim, I don't think we're ready for motion yet. 3351 04:44:03,530 --> 04:44:05,770 But we'll start with the act of the board, Jim. 3352 04:44:05,970 --> 04:44:06,670 Yeah, that. 3353 04:44:08,230 --> 04:44:10,350 OK, I think we've heard enough at this point. 3354 04:44:10,350 --> 04:44:23,310 have we? Yeah, hold on. No, I'm not. We get to. Yeah. Thank you. Thank you. Thank you, Jane. 3355 04:44:23,790 --> 04:44:28,610 Thank you. We'll take this at the board at this point. And having said that, I do have a question. 3356 04:44:28,750 --> 04:44:30,510 I'd like the response to answer. 3357 04:44:34,050 --> 04:44:38,570 Let's just assume hypothetically that it isn't three months and there is a plan whatever 3358 04:44:39,030 --> 04:44:42,870 you guys come back and it says it's going to cost a million dollars to fix it. 3359 04:44:43,190 --> 04:44:44,330 Are you going to do it? 3360 04:44:45,980 --> 04:44:47,520 No, no, but. 3361 04:44:48,560 --> 04:44:57,380 I will presume that we'll present that to you guys and the decision will be up to the property owner as to what will be possible solution that you guys would accept or you guys can reject. 3362 04:44:57,980 --> 04:44:59,600 I'm asking if you guys are going to pay for it. 3363 04:45:00,000 --> 04:45:04,880 I'm assuming that he's willing to make right with the property, that's why he purchased it. 3364 04:45:05,020 --> 04:45:06,060 Can you come in that? 3365 04:45:07,960 --> 04:45:09,360 First, I want to clarify the other. 3366 04:45:09,360 --> 04:45:12,600 No, I just want to question, yes, no. Will you pay for it? 3367 04:45:12,980 --> 04:45:20,260 I will pay what is required to get a stabilization plan. Your number is, no, we have to implement the plan. 3368 04:45:20,480 --> 04:45:21,280 I will implement the plan. 3369 04:45:21,320 --> 04:45:23,540 You'll pay for it to be built to fix. 3370 04:45:24,060 --> 04:45:29,680 Whatever the plan costs, whatever the plan says, it's going to cost more money to do it. 3371 04:45:29,680 --> 04:45:30,420 I'll get it done. 3372 04:45:30,420 --> 04:45:33,800 If you give me a permit to do it, I'll get it done. 3373 04:45:34,060 --> 04:45:35,240 Thank you. 3374 04:45:36,820 --> 04:45:40,420 I wanted to ask that question because I'm with Jane. 3375 04:45:41,880 --> 04:45:43,560 There's no doubt that there's risk. 3376 04:45:44,000 --> 04:45:45,000 It's been there for years. 3377 04:45:46,000 --> 04:45:49,180 I don't know that you knew all the things you bought when you bought the property. 3378 04:45:49,460 --> 04:45:50,460 But you bought the history. 3379 04:45:50,760 --> 04:45:51,500 No, I did not. 3380 04:45:51,840 --> 04:45:52,800 But there's a bit of paper. 3381 04:45:52,920 --> 04:45:53,720 People along to you. 3382 04:45:53,740 --> 04:45:54,540 This is not a question. 3383 04:45:55,560 --> 04:45:56,100 Three months. 3384 04:45:56,860 --> 04:45:58,760 This is not because I want three months. 3385 04:45:58,760 --> 04:45:59,640 I didn't ask a question. 3386 04:45:59,640 --> 04:46:06,540 I know, but I got to tell you, maybe you could just go set on for a second, because it's not a back and forth. Sorry. It's just not. Okay. So, 3387 04:46:09,970 --> 04:46:11,770 I'm worried that it's not going to get done. 3388 04:46:12,590 --> 04:46:17,570 And I'm worried that if we adopt what's been recommended that it's not going to matter. 3389 04:46:19,190 --> 04:46:28,950 That said, if we think collectively as a group, there's a path that might lead to a result of it being fixed, then I'm happy to consider that. 3390 04:46:29,630 --> 04:46:31,550 But frankly, we heard this two months ago. 3391 04:46:31,930 --> 04:46:33,430 This is the same discussion we had in November. 3392 04:46:34,310 --> 04:46:34,870 Give me time. 3393 04:46:34,970 --> 04:46:35,550 I'm going to come back. 3394 04:46:35,650 --> 04:46:36,210 I have a plan. 3395 04:46:36,310 --> 04:46:37,730 We talked about the exact same things. 3396 04:46:37,790 --> 04:46:39,710 We talked about the exact same words. 3397 04:46:40,710 --> 04:46:42,170 And nothing's happened except somebody 3398 04:46:42,170 --> 04:46:44,590 agreed to go out to a site visit, which hasn't happened yet. 3399 04:46:45,950 --> 04:46:47,270 So I'm sorry that you're in the situation, 3400 04:46:47,650 --> 04:46:49,830 but as the landowner, we do care. 3401 04:46:50,110 --> 04:46:52,170 And we do have to work together because you 3402 04:46:52,170 --> 04:46:55,850 are working with us because of where you own your feed title. 3403 04:46:57,570 --> 04:47:03,290 So the plans that you pull together, we have to see, we have to approve, we have to understand. 3404 04:47:04,430 --> 04:47:05,210 That's just how it works. 3405 04:47:05,830 --> 04:47:08,210 You can't do it at vacuum, you can't do it by yourself. 3406 04:47:08,390 --> 04:47:09,710 We have to be part of that. 3407 04:47:11,270 --> 04:47:14,310 So I want to hear what my colleagues think about this, 3408 04:47:14,970 --> 04:47:17,470 but I don't want to hear any more about what happened. 3409 04:47:17,890 --> 04:47:19,350 I want to hear about what's going to happen. 3410 04:47:19,550 --> 04:47:20,970 I want people that commit to something. 3411 04:47:22,030 --> 04:47:24,690 Because even then, whether it rains this year or not, 3412 04:47:25,390 --> 04:47:28,890 We're in a spot where it's highly unlikely anything will get built before next winter. 3413 04:47:29,550 --> 04:47:32,870 We'll be in another winter when things are going to be just like they are now or worse. 3414 04:47:33,890 --> 04:47:38,030 So maybe there are some things to do to shore it up before our permanent fixes in place, 3415 04:47:38,410 --> 04:47:42,630 but I'm well concerned and where Jane is about water perspective, 3416 04:47:42,910 --> 04:47:45,690 our responsibility and the risk that exists in getting something done. 3417 04:47:46,990 --> 04:47:48,230 I speak now. 3418 04:47:48,890 --> 04:47:49,390 Is it my turn? 3419 04:47:49,550 --> 04:47:50,210 No, no, no. 3420 04:47:50,230 --> 04:47:50,290 No, no. 3421 04:47:50,350 --> 04:47:52,730 The better it the board now, Mr. 3422 04:47:53,650 --> 04:47:57,410 Mario, William, we're dealing with it now. 3423 04:47:57,810 --> 04:47:58,950 Thank you. 3424 04:48:02,380 --> 04:48:02,900 Clyde? 3425 04:48:08,760 --> 04:48:11,180 If I didn't win Ryan over there. 3426 04:48:11,320 --> 04:48:11,840 Clyde. 3427 04:48:12,860 --> 04:48:14,840 Oh, did you want to? 3428 04:48:14,920 --> 04:48:16,440 Did you take your name off? 3429 04:48:16,640 --> 04:48:17,420 I think my name off. 3430 04:48:17,620 --> 04:48:18,100 OK. 3431 04:48:19,660 --> 04:48:22,240 You don't want any part of this. 3432 04:48:26,500 --> 04:48:37,460 I'd like to respond to Jane and Tim and just sort of put it in perspective as how I think about what our resolution says. 3433 04:48:39,000 --> 04:48:42,480 And our resolution says something has to get fixed. 3434 04:48:43,180 --> 04:48:50,400 We've said that in the three times before either the staff has in the board of firms. 3435 04:48:50,400 --> 04:48:53,660 So we've been saying that all along, this needs to get fixed. 3436 04:48:54,100 --> 04:48:55,980 So pass that part. 3437 04:48:57,680 --> 04:49:00,360 Then there are two items in the board's resolution. 3438 04:49:02,120 --> 04:49:05,160 The first one, and I'll just read it. 3439 04:49:05,400 --> 04:49:07,020 It's three lines long. 3440 04:49:07,200 --> 04:49:09,200 If I, I'm sorry, 3441 04:49:12,330 --> 04:49:13,670 just read this. 3442 04:49:14,050 --> 04:49:16,350 If the respondent does not secure the water side, 3443 04:49:16,350 --> 04:49:19,530 levied berm according to requirements, you know, 3444 04:49:19,550 --> 04:49:20,150 our requirements. 3445 04:49:20,290 --> 04:49:22,310 The board shall secure the berm for the remainder 3446 04:49:22,310 --> 04:49:32,050 the 2019-2020 flood season. I think we've, it doesn't take a lot to think that, that is not 3447 04:49:32,050 --> 04:49:38,630 going to happen in the next 30 days, where he secures it. It didn't go to happen. So therefore, 3448 04:49:38,650 --> 04:49:45,370 it triggers that it says, we will do it. And then the other, so that's element one number one. 3449 04:49:45,510 --> 04:49:51,130 You have to do something within 30 days, which can't be done in 30 days. So therefore, the state 3450 04:49:51,130 --> 04:49:56,150 will do it, and that's not necessarily a bad thing, and somebody is fixing it for you 3451 04:49:56,150 --> 04:49:59,990 keeping your house, and then the other one is the hundred and six. 3452 04:50:00,700 --> 04:50:25,020 So, I think those, you know, that's kind of what passing this resolution really means. So, and I sort of like, okay, so that's my comment there. And the other thing I think that we have to really do are make sure is that this can get done before at least the next winter. 3453 04:50:26,040 --> 04:50:30,260 That's we really have to get so it's kind of it can't be something that gets dragged out. 3454 04:50:30,460 --> 04:50:32,120 It has to be enough time here. 3455 04:50:32,740 --> 04:50:43,900 And I think if Mr. Myers is going to give us a plan, it has to be a plan that you've worked out with the engineers over here that you've talked about it with the Corps of Engineers. 3456 04:50:44,620 --> 04:50:46,140 You've got that all bald up. 3457 04:50:46,280 --> 04:50:50,860 So by the time it gets here, you've got a something that you can stand behind. 3458 04:50:50,860 --> 04:50:58,720 And you've got sort of the institutional support that does that, but, you know, whether, I don't know. 3459 04:50:58,900 --> 04:51:03,180 I'm okay with three months, but I want to make sure that it gets done. 3460 04:51:03,400 --> 04:51:13,560 If it does, if you're not here with a plan in three months, then I think this board just has to exercise what's in this, in our staff report. 3461 04:51:13,640 --> 04:51:20,840 And that is the state will do it because we can't have your house fall in the river and go down there and screw up the bridge and take out a 3462 04:51:20,840 --> 04:51:26,000 like that. Can't have that. That is not allowed. Can not threaten the people in 3463 04:51:26,000 --> 04:51:31,460 the Thomas. That is not allowed. So, that's my view. Mr. President, can I just 3464 04:51:31,460 --> 04:51:37,140 jump in first? It should be clear to everyone that if the state does it, that will 3465 04:51:37,140 --> 04:51:40,500 be a reimbursement back to the landowner. That's not a freebie for the state. 3466 04:51:41,640 --> 04:51:43,020 Right. Just make sure. 3467 04:51:47,480 --> 04:51:48,140 Okay. Okay. 3468 04:51:52,130 --> 04:51:55,250 I've had a little bit of experience in this kind of 3469 04:51:55,250 --> 04:52:03,130 where we've done this in Old Sacramento, and what would happen is that we would try to get 3470 04:52:03,130 --> 04:52:10,810 compliance with these kinds of things. Owners would drag on, drag on, wouldn't do anything, 3471 04:52:11,030 --> 04:52:17,690 would drag them up before the commission, and they say, give me 30 days or give me 60 days, 3472 04:52:18,610 --> 04:52:24,550 and I'll fix them or I'll bring back up better solution or whatever. We give them that, 3473 04:52:24,550 --> 04:52:31,130 and sometimes it works, sometimes it doesn't, but I think the boards in a better position 3474 04:52:31,950 --> 04:52:41,590 to allow the person he's committed in three months to bring back a contract with a stabilization 3475 04:52:41,590 --> 04:52:50,430 plan, a time play table, and a commitment to pay, like Tim said, and if you're committing to that 3476 04:52:50,430 --> 04:52:53,410 today that you will do that in three months. 3477 04:52:54,490 --> 04:52:57,130 And it comes back and it's done well, good. 3478 04:52:57,670 --> 04:53:00,490 If it's not, you're in a lot of trouble. 3479 04:53:03,960 --> 04:53:06,000 OK, that's the issue before the board. 3480 04:53:06,160 --> 04:53:11,480 As far as I'm concerned, Jane, are you on here? 3481 04:53:12,160 --> 04:53:12,800 I am. 3482 04:53:12,880 --> 04:53:13,660 Yeah, OK. 3483 04:53:16,160 --> 04:53:17,120 The leads yourself, Jane. 3484 04:53:17,360 --> 04:53:17,840 There you go. 3485 04:53:18,200 --> 04:53:19,900 I didn't touch it. 3486 04:53:21,690 --> 04:53:25,130 What you requested is not what I am in favor 3487 04:53:25,130 --> 04:53:34,370 of moving, and April 6, 2018, and notice the violation was issued, April 6, 2018. 3488 04:53:35,790 --> 04:53:42,850 In two short months, that will be two years of very clear information to the property owner 3489 04:53:42,850 --> 04:53:44,150 what needs to be done. 3490 04:53:44,430 --> 04:53:46,190 Didn't say do something three months. 3491 04:53:46,790 --> 04:53:52,670 It said submit a plan and a projected schedule, and then go to there what needs to be done. 3492 04:53:52,670 --> 04:53:59,850 submit a plan with the project with a proposed schedule and how to repair the notice of violation, 3493 04:54:00,990 --> 04:54:04,010 submit a name change, and submit an encroachment from it. 3494 04:54:05,210 --> 04:54:08,870 Didn't say you had 10 days to do it, didn't say that, and you need to submit a plan. 3495 04:54:10,230 --> 04:54:18,930 After something less than two years came a memo or an email to the board and an attached contract 3496 04:54:18,930 --> 04:54:20,570 to set up a site visit. 3497 04:54:22,150 --> 04:54:31,970 So I appreciate, I have a little bit of experience in these kinds of hearings myself, maybe that's why I don't, I think you need to say it have to do it. 3498 04:54:32,650 --> 04:54:49,150 I sat on a local government board for 32 years that did these things and got pretty sympathetic with people early on and then found that being sympathetic means you're just sympathetic 30 days later in your sympathetic three months later. 3499 04:54:49,150 --> 04:54:51,470 These violations need to be done. 3500 04:54:51,750 --> 04:54:55,930 Property owners have due diligence to act upon their property. 3501 04:54:57,290 --> 04:54:59,990 For me, my due diligence is to support. 3502 04:55:00,080 --> 04:55:08,700 What has been brought forward to us in very comprehensive fashion that these need to be corrected, and an order needs to be issued? 3503 04:55:08,860 --> 04:55:09,700 I understand. 3504 04:55:13,380 --> 04:55:13,500 No. 3505 04:55:14,740 --> 04:55:19,160 The matter is before the board at this point where we've closed public hearing. 3506 04:55:19,560 --> 04:55:21,780 Well, I'm going to surprise tonight. I'm going to see how this goes. 3507 04:55:22,420 --> 04:55:28,080 I moved at this board to adopt the enforcement order resolution as recommended by staff. 3508 04:55:34,070 --> 04:55:35,770 So a second? 3509 04:55:39,740 --> 04:55:41,420 Okay. Call the roll please. 3510 04:55:41,860 --> 04:55:47,740 All the way. You know 3511 04:55:51,900 --> 04:55:59,720 when this property was purchased is irrelevant. A notice was given in 2018. 3512 04:56:02,300 --> 04:56:11,480 If the person at sold this property didn't properly notify the buyer, then the buyer can go back and sue the 3513 04:56:12,540 --> 04:56:19,200 original person. I don't know. My understanding is that he was notified of this requirement. 3514 04:56:20,160 --> 04:56:26,260 And if he wasn't, then I think he's got a good solid claim against the seller of the property. 3515 04:56:27,120 --> 04:56:33,440 For not properly notifying him of the restrictions that were out there and ongoing. 3516 04:56:34,200 --> 04:56:34,920 So, 3517 04:56:36,980 --> 04:56:43,160 it just doesn't sell with me that it's like, oh, I'm not given any time. 3518 04:56:43,440 --> 04:56:44,620 It's since 2018, 3519 04:56:46,780 --> 04:56:53,180 I can't fathom any reason why this engineer's report has not been 3520 04:56:53,180 --> 04:57:00,320 provided on how to fix this property and move forward. 3521 04:57:01,360 --> 04:57:07,000 people like to live out there next to the river, and they say they're willing to accept 3522 04:57:07,000 --> 04:57:13,680 the risk of living there, because they like to have the river there, and etc. 3523 04:57:14,340 --> 04:57:14,340 Well, 3524 04:57:16,500 --> 04:57:21,000 if you want to live next to the river, you have to live with the costs of maintaining 3525 04:57:21,000 --> 04:57:29,140 it, because rivers move, and rivers cause erosion, and especially if you have unapproved 3526 04:57:29,140 --> 04:57:35,100 features like that flood wall that was put out there that may have exacerbated this situation. 3527 04:57:36,080 --> 04:57:45,580 So I feel that, you know, we should move forward with this and I intend to vote in favor 3528 04:57:45,580 --> 04:57:46,340 of the motion. 3529 04:57:48,020 --> 04:57:49,220 Other speaking? 3530 04:58:03,410 --> 04:58:04,150 Okay. 3531 04:58:04,150 --> 04:58:05,570 Okay, 3532 04:58:11,860 --> 04:58:18,300 I guess I'm going to vote against it because I think that, yes, the staff is 3533 04:58:18,300 --> 04:58:24,960 done properly, the evidence is there, all the information and material. 3534 04:58:25,800 --> 04:58:34,420 But at this meeting, we have the property owner committing to the board that within three months, 3535 04:58:34,420 --> 04:58:42,640 He's going to have what we've asked for and committed to, and it's his word if he doesn't come up with it 3536 04:58:42,640 --> 04:58:45,420 Well, there's no question about it 3537 04:58:45,420 --> 04:58:48,860 If he does is able to fix it then 3538 04:58:48,860 --> 04:58:50,540 Then good 3539 04:58:50,540 --> 04:58:51,580 Can you say you fix it? 3540 04:58:51,640 --> 04:58:52,280 What do you mean? 3541 04:58:52,440 --> 04:58:56,060 You come back and with a plan that meets the staff requirements 3542 04:58:56,060 --> 04:58:57,460 Fix it physically 3543 04:58:57,460 --> 04:58:58,320 No, not physically 3544 04:58:58,320 --> 04:59:01,240 No, he told me that that couldn't be done 3545 04:59:01,240 --> 04:59:01,840 Yeah 3546 04:59:01,840 --> 04:59:09,960 So, you know, that's, yeah, so that's kind of where I am, but it's not, you know, 3547 04:59:10,180 --> 04:59:12,700 it's not a slap at the face of the staff. 3548 04:59:12,920 --> 04:59:15,980 It's just, I think we're in a better position to do that. 3549 04:59:16,440 --> 04:59:23,080 Well, can I ask, for you, if it's the time, provided that's most important, 3550 04:59:23,480 --> 04:59:25,440 or the fine that's involved or both? 3551 04:59:25,840 --> 04:59:29,620 It's the fine and the fact that we're taking a final action 3552 04:59:29,620 --> 04:59:35,340 when he has publicly indicated that if you give me three more months, I'll come pull up. 3553 04:59:36,060 --> 04:59:40,760 And I, I mean, or I didn't think I would see what happens. 3554 04:59:42,000 --> 04:59:46,220 So I'm going to go off the tracks here, I don't know if I can do this, but if I can't, 3555 04:59:46,320 --> 04:59:47,620 she will tell me. 3556 04:59:48,920 --> 04:59:55,400 And maybe make a friendly amendment to my second, which is that we adopt the staff recommendation 3557 04:59:55,400 --> 04:59:59,940 and with the condition that the fine wouldn't take effect for three months. 3558 05:00:00,140 --> 05:00:10,580 And if the staff is satisfied with the plan has been submitted by that time, then the fine would not be included in the order. Is that possible? 3559 05:00:11,380 --> 05:00:16,100 The board has a discretion to amend the proposed order, so yes, that is possible. 3560 05:00:16,880 --> 05:00:18,260 As an agenda item. 3561 05:00:18,260 --> 05:00:20,540 As an agenda item, made it, I want to make sure that Jane. 3562 05:00:20,640 --> 05:00:25,840 Yes, I know, and I, you know, he's an attorney. I'm someone who actually certified to teach parliamentary procedure. 3563 05:00:27,000 --> 05:00:32,120 I accept that. I actually feel a little note here for a further time that I would accept 3564 05:00:32,900 --> 05:00:40,040 staying in position of the administrative penalty for three months and a report from staff 3565 05:00:40,040 --> 05:00:48,080 of what is submitted is appropriate to determine that there will be movement forward to correct the actions. 3566 05:00:48,240 --> 05:00:49,140 Okay, thank you. 3567 05:00:49,240 --> 05:00:51,940 Because I would like to see that money go into the plan. 3568 05:00:52,760 --> 05:00:57,000 And that gives us a better breathing room and maybe we get a vote from Bill. 3569 05:00:57,280 --> 05:00:59,260 And there's a second verse so you agree with it? 3570 05:00:59,340 --> 05:01:00,600 Well, could I ask for a second? 3571 05:01:01,100 --> 05:01:02,140 I'll read the second note. 3572 05:01:02,260 --> 05:01:07,180 Could I just get clarification that the it that you're talking about is a certified 3573 05:01:08,280 --> 05:01:14,600 engineer's report, stabilization plan with specific timelines and actions that will be done. 3574 05:01:14,880 --> 05:01:15,920 Is that what we're talking about? 3575 05:01:15,920 --> 05:01:16,960 But our staff agree. 3576 05:01:16,980 --> 05:01:17,200 Yeah. 3577 05:01:17,760 --> 05:01:18,740 It makes those conditions. 3578 05:01:19,280 --> 05:01:26,160 It will not be implemented, but it will be submitted with a time table and an action 3579 05:01:26,160 --> 05:01:26,480 plan. 3580 05:01:27,420 --> 05:01:27,560 Yeah. 3581 05:01:27,560 --> 05:01:28,520 That's what we're talking about. 3582 05:01:28,760 --> 05:01:29,000 Okay. 3583 05:01:29,560 --> 05:01:35,820 And if that is done within three months, from today, accepted by the staff, the enforcement 3584 05:01:35,820 --> 05:01:39,360 order is still in effect, except there would be no fine. 3585 05:01:40,120 --> 05:01:41,420 Is that what I'm understanding? 3586 05:01:41,420 --> 05:01:46,880 And if that is not done in three months, then the enforcement order with the fine is. 3587 05:01:46,960 --> 05:01:47,260 That's right. 3588 05:01:47,420 --> 05:01:49,200 I would propose we don't hear it again. 3589 05:01:49,420 --> 05:01:51,160 That's just how it works. 3590 05:01:51,480 --> 05:01:55,840 That three months see their staff for satisfied and we hear about it. 3591 05:01:56,000 --> 05:01:56,480 Or they're not. 3592 05:01:56,600 --> 05:01:57,980 In which case we also hear about it. 3593 05:01:58,140 --> 05:01:59,640 But either way we don't need to hear it again. 3594 05:02:01,340 --> 05:02:07,560 Thank you Executive Office for clarifying and giving us complete sentences to add to this motion. 3595 05:02:08,660 --> 05:02:10,780 So as to make her the motion I agree with that. 3596 05:02:10,780 --> 05:02:12,020 Okay, that's a good amendment. 3597 05:02:12,560 --> 05:02:16,620 I think that we, whether you, whether you have the 3598 05:02:16,620 --> 05:02:17,240 hundred. 3599 05:02:17,360 --> 05:02:18,340 I like this amendment. 3600 05:02:18,860 --> 05:02:20,120 Yeah, the amendment's good. 3601 05:02:21,660 --> 05:02:21,960 All right. 3602 05:02:22,100 --> 05:02:23,540 So we have a motion. 3603 05:02:23,540 --> 05:02:24,540 I just got us. 3604 05:02:24,680 --> 05:02:25,020 Oh, climb. 3605 05:02:25,520 --> 05:02:25,960 Oh, climb. 3606 05:02:26,380 --> 05:02:30,620 This is a technical point for the maker of the motion in the second. 3607 05:02:31,420 --> 05:02:34,420 The going back to that sentence. 3608 05:02:34,660 --> 05:02:36,420 I read two, four. 3609 05:02:36,680 --> 05:02:38,740 Yeah, dealing with the March 30th. 3610 05:02:38,740 --> 05:02:46,880 In other words, if Mr. Meyer doesn't come back with a complete plan, that by March 30th, 3611 05:02:46,880 --> 05:02:48,240 then the board would do that. 3612 05:02:48,240 --> 05:02:56,280 That would be clarified so that if he, in three months, if he's not here, there'd be that the 3613 05:02:56,280 --> 05:02:59,780 state would take it over and do it just as it is in the plan if that's where. 3614 05:02:59,780 --> 05:03:01,820 But it would be May instead of March. 3615 05:03:02,320 --> 05:03:05,540 It would be just, if he misses the date, it's triggered. 3616 05:03:06,020 --> 05:03:09,420 So that's, so that March 30th date is May. 3617 05:03:09,600 --> 05:03:09,920 Be modified. 3618 05:03:10,540 --> 05:03:11,360 I was April. 3619 05:03:11,460 --> 05:03:12,060 For the record. 3620 05:03:12,440 --> 05:03:14,880 I was not proposing to modify that part of it. 3621 05:03:14,900 --> 05:03:15,720 For me, that's unrelated. 3622 05:03:16,060 --> 05:03:18,460 That's the, oh my god, we need to do something now. 3623 05:03:19,020 --> 05:03:20,160 We need a long-term plan also. 3624 05:03:20,520 --> 05:03:22,920 But I read this to say that. 3625 05:03:23,000 --> 05:03:24,580 What do we make that with a long-term plan? 3626 05:03:24,720 --> 05:03:27,400 We still need people to go out and do something today. 3627 05:03:27,560 --> 05:03:28,900 This winter to stabilize it. 3628 05:03:28,940 --> 05:03:31,600 If you want to change that date, that's fine. 3629 05:03:31,740 --> 05:03:33,220 I was not proposing to change that date. 3630 05:03:33,220 --> 05:03:43,060 Now, the current resolution says that if he doesn't complete the work within 30 days, 3631 05:03:44,540 --> 05:03:45,640 the state will do the work. 3632 05:03:46,840 --> 05:03:47,820 So now we're going to have it. 3633 05:03:48,040 --> 05:03:49,900 So we're shoving this forward. 3634 05:03:51,540 --> 05:03:53,060 Does the date go forward? 3635 05:03:53,100 --> 05:03:56,500 I mean, what it really ought to be, if he does this work, nothing happened. 3636 05:03:56,620 --> 05:03:58,900 If he does it, comes back, everything gets done. 3637 05:04:00,000 --> 05:04:07,280 But if he doesn't do the work, then the guillotine ought to come down, and no 30 days just 3638 05:04:07,280 --> 05:04:08,700 just have to stay through the work. 3639 05:04:10,960 --> 05:04:11,860 That clear. 3640 05:04:13,850 --> 05:04:14,150 Clear? 3641 05:04:16,950 --> 05:04:17,430 Yes. 3642 05:04:17,870 --> 05:04:23,930 I think that they ought to be, everything ought to be three months for the organization 3643 05:04:23,930 --> 05:04:29,570 of the actual action, of the penalty and of the, of the, of the, of the, of the, 3644 05:04:29,570 --> 05:04:46,510 So, now I'm curious because I was interpreting the March 30 date as some sort of emergency repair and not the long-term effects because this is further remainder of the 2019-20-20 season. 3645 05:04:48,150 --> 05:04:50,510 So, I guess that's a question for Sir Dyson. 3646 05:04:50,510 --> 05:04:59,750 on tight portion section. Yes, the way the portion order was written was to get that. 3647 05:05:09,340 --> 05:05:23,570 I'm not sure. I'd have to talk to DWR maintenance, flood maintenance office to see if that could truly be done. Talk to RD1000 if they have resources to do it. Get it done. 3648 05:05:23,810 --> 05:05:28,430 Well again, though, those are all items that would be charged back to the homeowner if those were done. 3649 05:05:28,430 --> 05:05:35,250 So we give him 30 days to do it, if he doesn't do it, and we step in and do it, and then we have to 3650 05:05:35,250 --> 05:05:41,190 kind of jump down and it's, can he get it done? Like he couldn't do a stabilization, implement a 3651 05:05:41,730 --> 05:05:49,430 stabilization, you know, planet in 30 days, but he can, can he do the emergency work in 30 days? 3652 05:05:51,480 --> 05:05:57,120 Like I said, President, I'm not, I'm not sure it would probably be possible. It may not be possible. 3653 05:06:01,800 --> 05:06:04,520 Is it an emergency though? 3654 05:06:05,620 --> 05:06:11,520 Technically no, because when the Army Corps of Engineers evaluated the situation to see if 3655 05:06:11,520 --> 05:06:18,440 it was going to be a public law 84-99 site, they came back and said no, because the erosion 3656 05:06:18,440 --> 05:06:23,480 had not impranged upon the levy prism at that point in time. 3657 05:06:24,260 --> 05:06:29,840 It's still there was still enough water side levy berm to a road before it got to the levy prism. 3658 05:06:29,840 --> 05:06:32,200 And that's why the Army Corps of Engineers did not 3659 05:06:32,200 --> 05:06:35,200 designate this site as a public law 8499. 3660 05:06:35,560 --> 05:06:36,200 We per site. 3661 05:06:36,860 --> 05:06:37,920 So it's not an emergency. 3662 05:06:39,720 --> 05:06:41,120 OK, then Mr. President. 3663 05:06:41,360 --> 05:06:44,980 Why wouldn't we just postpone the March 20th through the three 3664 05:06:44,980 --> 05:06:46,260 months date? 3665 05:06:46,500 --> 05:06:48,820 I think that's what the proposal was. 3666 05:06:49,120 --> 05:06:52,800 Well, I know James said she wanted, or Brian said. 3667 05:06:53,100 --> 05:06:53,800 Does he? 3668 05:06:53,860 --> 05:06:54,740 Brian asked the question. 3669 05:06:54,800 --> 05:06:57,300 Or Brian asked the question of whether this was an effect. 3670 05:06:57,300 --> 05:06:58,220 He did the emergency. 3671 05:06:58,220 --> 05:07:04,320 We're getting the implication that it's really not an emergency as court defines it. 3672 05:07:04,320 --> 05:07:05,700 That's as the court finds it. 3673 05:07:05,700 --> 05:07:10,700 It was not my intent to modify that date, but I get the impression that people would like to have a modified. 3674 05:07:11,760 --> 05:07:14,620 So if that's the case, that's fine also. 3675 05:07:14,720 --> 05:07:23,040 I think the same three month window would be fine, which takes it to what was the May 30 date. 3676 05:07:23,040 --> 05:07:28,220 We would be looking at if we if we did, you know, three months we would be looking at May 3677 05:07:31,120 --> 05:07:36,460 29th. Okay. Friday, May 29th. Yeah, that's right. That's that's that's another change. 3678 05:07:36,840 --> 05:07:42,780 Thank you for finding that. We'll have found that. Brian helped me understand it. And I'd be 3679 05:07:42,780 --> 05:07:47,020 find to make that change as well. So it lines up with the date we talked about for the fine. 3680 05:07:47,020 --> 05:07:54,740 Yeah, so if it isn't done in through months the staff has the authority to go ahead and impose the order 3681 05:07:55,320 --> 05:08:02,580 As if for the fine and also for the the work that would be there and right away in the field that would be 3682 05:08:02,580 --> 05:08:07,120 Without coming back to the home one eventually. Okay, then I need to add something to the original 3683 05:08:07,120 --> 05:08:12,980 I think you have it and I also have a follow up. I'm just gonna look at suggestion but I think that's make 3684 05:08:12,980 --> 05:08:15,120 for the motion I needed that date change. 3685 05:08:15,940 --> 05:08:17,740 Okay, Brian, you had Mr. Mayor. 3686 05:08:17,740 --> 05:08:17,800 Mr. Mayor. 3687 05:08:19,440 --> 05:08:22,160 Just to clarify, then, because my interest is making sure 3688 05:08:22,160 --> 05:08:24,120 that it gets fixed before next year, 3689 05:08:24,340 --> 05:08:29,540 to clarify that there wouldn't be a way to fix it 3690 05:08:29,540 --> 05:08:31,400 and reduce any remaining risk for this year anyway, 3691 05:08:31,640 --> 05:08:34,100 and that May is fine for next year. 3692 05:08:34,500 --> 05:08:36,600 That that leads to 2020-21. 3693 05:08:37,440 --> 05:08:37,620 2019. 3694 05:08:38,460 --> 05:08:38,520 2020. 3695 05:08:39,540 --> 05:08:40,240 May 2019. 3696 05:08:40,300 --> 05:08:42,520 Yeah, in between that period for the emergency 3697 05:08:42,520 --> 05:08:47,520 repairs that that works if it comes back to to awesome we have to do that work. 3698 05:08:49,400 --> 05:08:57,840 Should and I feel like you're going to have to have another like we have a through I think G in here by ordered that. 3699 05:08:58,120 --> 05:09:03,560 You're going to have to have another you know big paragraph describing what you want to do right now. 3700 05:09:04,360 --> 05:09:05,500 Well we just explained it. 3701 05:09:06,660 --> 05:09:07,940 I'm sorry, I'm sorry. 3702 05:09:08,000 --> 05:09:09,900 Now, possible, we'll be able to clarify that. 3703 05:09:10,060 --> 05:09:13,640 We can modify the language to apply, I just want to make sure 3704 05:09:13,640 --> 05:09:17,320 that we are pushing all of the dates then. 3705 05:09:18,040 --> 05:09:24,820 The May 29 would be for the emergency repairs or the stabilization 3706 05:09:24,820 --> 05:09:27,760 of the site, if we're not calling them emergency repairs. 3707 05:09:28,780 --> 05:09:31,420 The stabilization plan for the more long-term fix. 3708 05:09:31,900 --> 05:09:32,400 Correct. 3709 05:09:32,840 --> 05:09:33,880 Is that what we're talking about? 3710 05:09:34,360 --> 05:09:35,260 Well, we're talking. 3711 05:09:35,360 --> 05:09:41,200 That's not done to the staff's approval by the 29th and the imposition of fines and whatever 3712 05:09:41,200 --> 05:09:43,660 other staffs we have to take to get the work done at that point. 3713 05:09:43,780 --> 05:09:44,460 That's true. 3714 05:09:44,700 --> 05:09:44,800 Okay. 3715 05:09:45,460 --> 05:09:55,020 If I may speak, it may be cleaner instead of trying to massage the current order to include 3716 05:09:55,020 --> 05:09:59,760 all these additional things is just adopt the order and suspend. 3717 05:10:00,000 --> 05:10:06,560 It's implementation for the three months, the 90 days, and if it's not done, then the order becomes effective. 3718 05:10:07,500 --> 05:10:11,540 Then you're not having to change anything in the order itself. 3719 05:10:11,720 --> 05:10:12,900 I like that. 3720 05:10:12,900 --> 05:10:14,700 Actually, that makes sense. 3721 05:10:14,700 --> 05:10:16,880 We would just still need to modify the dates. 3722 05:10:17,940 --> 05:10:24,780 Yeah, but there's John is saying there may be some other things within the order that would be out of sync, 3723 05:10:25,080 --> 05:10:26,700 so they suspension sounds. 3724 05:10:26,820 --> 05:10:27,340 Okay. 3725 05:10:27,340 --> 05:10:28,080 it makes sense. 3726 05:10:29,940 --> 05:10:40,360 So now your motion would be to adopt the order and hold it in a game for three months. 3727 05:10:41,460 --> 05:10:43,700 I would offer that substitute motion. 3728 05:10:44,800 --> 05:10:45,860 Should I second it? 3729 05:10:45,860 --> 05:10:46,380 Yes. 3730 05:10:46,500 --> 05:10:47,340 I'll second it. 3731 05:10:48,260 --> 05:10:49,380 Thank you for that. 3732 05:10:49,380 --> 05:10:52,680 I think that's what we did, but it makes our attorney feel better. 3733 05:10:52,680 --> 05:10:54,320 I'm happy to do a substitute motion. 3734 05:10:56,400 --> 05:10:58,560 That's a good solution to you. 3735 05:10:59,380 --> 05:11:07,800 Yeah, because then doesn't have to come back here and we've committed to give the property owner 3736 05:11:07,800 --> 05:11:08,300 chance. 3737 05:11:08,940 --> 05:11:13,460 He's committed to do that and we'll see what happens. 3738 05:11:14,520 --> 05:11:15,540 Call the roll please. 3739 05:11:17,300 --> 05:11:24,840 This was a motion articulated by our executive officer, moved by 3740 05:11:24,840 --> 05:11:32,060 Vice President Dolan, seconded by Tim Ramirez, call the roll please. 3741 05:11:32,500 --> 05:11:37,680 Board Member Johnson, Board Member Ramirez, Board Member Countryman, 3742 05:11:38,560 --> 05:11:45,060 Board Member McConnell, Vice President Dolan, President Edgar, yes, 3743 05:11:47,630 --> 05:11:48,810 thank you, 3744 05:11:53,210 --> 05:11:56,550 okay we're 3745 05:11:56,550 --> 05:11:59,390 to tell where we appreciate your patients. 3746 05:12:01,430 --> 05:12:07,650 We're now moving back to our item 12. 3747 05:12:08,990 --> 05:12:13,290 We have our regular reports that we normally have 3748 05:12:13,290 --> 05:12:16,570 or there are any questions on any reports that are 3749 05:12:16,770 --> 05:12:18,250 talked about in item 12. 3750 05:12:18,290 --> 05:12:21,670 The administration operations plan implementation 3751 05:12:22,110 --> 05:12:24,710 or environmental services and land management. 3752 05:12:24,710 --> 05:12:27,970 Lastly, do you have any comments you want to make on those? 3753 05:12:28,390 --> 05:12:30,010 Okay. Any more board members? 3754 05:12:31,070 --> 05:12:35,930 Okay. Item 13 were on board comments and committee updates, 3755 05:12:37,210 --> 05:12:38,450 Clyde, Jane? 3756 05:12:39,390 --> 05:12:41,210 I'm not going to dare to lengthen this meeting. 3757 05:12:44,110 --> 05:12:44,710 Joe? 3758 05:12:45,650 --> 05:12:45,810 No. 3759 05:12:46,830 --> 05:12:46,970 Tim. 3760 05:12:47,910 --> 05:12:48,850 And Brian. 3761 05:12:52,150 --> 05:12:56,690 Item 14, let's do, do you have any specific dates you want to 3762 05:12:56,690 --> 05:13:05,570 I do yet. There are no dates on there just to remind everyone that we have canceled the March 3763 05:13:05,570 --> 05:13:11,150 and April workshops. So please remove those holds that you had on your calendars for both 3764 05:13:11,150 --> 05:13:26,670 of those. Our next regularly scheduled meeting is March 27th. I have gotten a message from our 3765 05:13:26,670 --> 05:13:34,670 town meeting and is unable to make that if Mr. President, we don't have reappointments at that 3766 05:13:34,670 --> 05:13:40,050 date. We will not have a quorum at that point. So I will be sending out a message after 3767 05:13:40,050 --> 05:13:45,510 Sunday. If I don't hear anything from the Governor's office about whether that meeting 3768 05:13:45,510 --> 05:13:50,810 perhaps will be canceled as well. But for now it's on the agenda. It's on the calendar. 3769 05:13:50,810 --> 05:13:53,270 I am not going to be here for that meeting. 3770 05:13:53,510 --> 05:13:57,210 I've been called to a director's convening down in Los Angeles. 3771 05:13:57,750 --> 05:14:02,010 So, my gripe will be sitting in for me for that meeting as well. 3772 05:14:03,130 --> 05:14:04,450 I have a question concerning. 3773 05:14:05,250 --> 05:14:11,070 My understanding is, at least with my status, and I think the other two members is, after 3774 05:14:11,070 --> 05:14:15,610 this meeting, we're no longer authorized to represent the board. 3775 05:14:17,170 --> 05:14:27,070 Sunday, Sunday is the last date and I have an indication that there is perhaps still a decision coming by Sunday, which is why I don't know yet. 3776 05:14:27,390 --> 05:14:32,970 But if it didn't for some reason, we really couldn't need to represent the floor. 3777 05:14:33,490 --> 05:14:40,490 Your terms will expire. You're in your holdover status now and your terms will expire on Sunday, if not reappointed. 3778 05:14:40,490 --> 05:14:48,630 Okay. Thank you. Yeah, and we would barely have a quorum left at that point and that's why 3779 05:14:48,630 --> 05:14:53,890 Brian's absence from that one meeting would mean we don't have a quorum. And that just applies 3780 05:14:53,890 --> 05:14:59,990 to board members, Ramirez, McDonald and John, and, uh, uh, countrymen. Okay. 3781 05:15:00,000 --> 05:15:11,480 Okay, members, thank you for your patience today, is a long hard meeting. I appreciate it. I am 15, is adjournment and without objection, this meeting is adjourned.