[0:11] Good morning everyone. Welcome to the regular meeting of the city of [0:13] Charlestown Sanitary Super Board. Today is July 16th, 2026 and it is 900 a.m. [0:19] This meeting is being livereamed by city staff. We'll begin our meeting with the [0:24] pledge of allegiance. [0:28] I pledge algiance to the flag of the United States of America to the republic [0:33] for it stands one nation under God indivisible with liberty and justice for [0:39] all. [0:42] » Thank you. Let the record show that all board members are present as well as [0:44] clerk treasurer Donnie Kumer. And we have our attorney with us. Um oh my god [0:50] Brad. Sorry Brad. I almost said mo but I don't want to do that to you. [laughter] [0:55] » We have an agenda that's been provided. Entertain a motion to approve. [0:58] » I want to cut motion. >> Motion made by Michael Grayson. [1:01] » Second. >> Second by Nathan Grimes. Any edits to [1:03] the agenda? Hearing none. All in favor say I. [1:07] » I. >> I. [1:08] » Any opposed? That's unanimous. We have our standing business which includes the [1:12] approval of our meeting minutes from the regular meeting on July 2nd and the [1:16] executive session on July 2nd. I will note that there's one error in the July [1:21] 2nd executive session minutes to be corrupted and that is that Bo Zeller was [1:25] the attorney present at that meeting um and so did Brad and we have our current [1:29] claims in our payroll allowance docket from June 28th to July 11th. With that [1:34] edit made, I would entertain a motion to approve. [1:37] » A motion to approve. >> Motion by Michael Grayson. Second. [1:39] » Second by Nathan Grimes. All in favor say I. I. [1:43] » I. Any opposed? That's unanimous. Does anyone sign up for public comment? None. [1:48] Uh, no old business. We'll move straight into new business. First up, we have our [1:52] operator's report. Tim Crowder. >> Good morning. [1:57] » Um, typically on the second meeting of the month, I'll have before you the [2:01] monthly reports uh due to some uncontrollable circumstances. That [2:07] report has been done. I did not get it in to Randy on before the day deadline [2:12] to get it to you. the plan was run totally in compliance during the month [2:16] of June. I will have that paperwork supported to you and Don at at the next [2:21] board meeting. Pardon me. So, but other than that, there has been a lot of [2:26] activity in utility uh primarily with staffing uh with we've got we've had [2:33] some additional staff that we've brought on. the labor's position that you that's [2:37] the that's board approved months ago I would say has been filled [2:42] uh with a new gentleman that started this Monday. So things are going well [2:46] with that. Uh we have uh with again with this board's approval and recommendation [2:52] and approval by the city council starting Monday. We will have an [2:57] administrative assistant. Uh we're very very fortunate to be able to have Don [3:02] might not apply this but not talking to you. [laughter] [3:06] » We're getting we're getting one of our staff members to come over and work with [3:10] us and we're very excited about it. So, uh the the So, we've gained two and a [3:15] half people. The one I haven't talked about is the half person yet. And trust [3:20] me, this young lady is not a half person. She come in on our work summer [3:24] work program and she has done a phenomenal job. [3:29] uh we have extended her a part-time position until she gets her full-time [3:34] status at her at IUS where where she's going to go and she's agreed to do that [3:38] for us. So, we're very excited. We made a lot of improvements in that area. Uh [3:44] the the construction continues at the plant primarily in the phase two we're [3:48] working on we're continuing to work on some issues that we're having. Uh with [3:52] that being said, unless you have any questions to the information I've [3:55] presented to you at this point, I have asked Mr. Jim Hagerty to uh attend with [4:01] us today, he has a couple of items and he'll he'll explain but understand the [4:07] presentation and change order are two separate items that we'll be talking [4:10] about today. So I'll entertain any questions you have on stuff that I've [4:16] given you. If no questions, I'll ask Mr. Hag to come up. [4:19] » Uh no questions. just um just a comment that we've done this um summer works [4:25] program now for I guess three years >> and um [4:30] » it's it's been it's been really great and I know sometimes staff can get a [4:34] little bit frustrated with having to bring part-time people in. It's it's [4:38] something we don't pay for. The Southern Indiana Works program pays for the [4:41] summer works program. It gives young people an opportunity to explore career [4:46] paths and we've met some really outstanding young people through that [4:49] and so Thank you to your staff for taking that young lady on through that [4:53] program and training her because it sounds like she's really been an asset [4:58] and it's gone. There's been a reciprocity there. She's learned a lot [5:00] from you guys and and we're benefiting from that for the plant. And as hard as [5:04] it is to find people that are interested in wastewater as a career, it's nice to [5:08] know there are young people that are still um just nerdy enough like us to [5:12] want to to be involved in that. So, thank you for you and your staff. [5:16] » You're very welcome. It's been our pleasure. It truly has. So, We can [5:19] welcome Jim up to make your presentation. [5:22] » Your presentations are on your tablets. I believe that everybody should see [5:26] them. So, >> yeah. [5:28] » Good morning. Glad to know that I'm nerdy. [5:32] [laughter] >> Well, I mean, I'm putting myself in that [5:35] » basket. I was up there to plan again yesterday. So, [5:38] » I love the interns we have with you and gives you a great opportunity to see the [5:43] interns and and get them interested in our field of interest. Uh, thank you. [5:49] This is my name is Jim Hagerty. I'm with Prime AE Engineering, formerly JTL. Um, [5:55] I got two items to discuss with you today. One is the additional sludge [5:59] disposal cost that we're incurring at the plant. Um, that is not included in [6:04] the change order six that we're presenting to you. It's kind of [6:08] anformational for future reference of why this will come to you at some point. [6:13] And then I have uh kind of a summary of the past change orders as well as change [6:18] order six to present to you today for consideration. So I will start with the [6:24] uh the sludge. You have a I guess a small presentation in your package. Um [6:32] so the the original contract scope of [6:37] services that we that we uh developed with the contractor was the city's [6:43] responsibility. We had two sludge storage tanks. They were that the city [6:48] was responsible for emptying those sludge storage tanks. We provided some [6:52] piping arrangement to allow them to discharge that to the new presses. Once [6:58] we got to that point, um, PAC's responsibility, the contractor was to [7:04] dispose of two feet of sludge in your bileac or your aeration basin. So that's [7:09] how we prepare the contract or bid this go to work. [7:14] Um, when we got to the point of looking at the sludge storage tanks, um, sludge, [7:20] which was the city's responsibility, there was a lot of debris. We didn't [7:24] have good screens in at the plant. There was a lot of debris, rags, applicators, [7:30] trash, and that type of stuff. And we were concerned with two things. One was [7:35] pumping it into the new dewatering equipment. That equipment is, you know, [7:39] the presses are $400,000. The pumps are half or 50 to $70,000. [7:45] So, we were with all the debris, we were very conscious of the issue of pro [7:50] possibly damaging equipment we just installed. as well. Um there was a time [7:56] issue with that. Um right now I think pace is in two plus months of trying to [8:02] dewater all this sludge. And the other concern and Tim you correct me was the [8:07] time. If the city did it, you all have additional responsibilities. [8:11] You had to go out if there was a sewer break. They would have had to leave and [8:14] we were concerned with delaying the contractor. So the decision was was to [8:19] pump all the sludge from the storage tanks. [clears throat] And I guess I [8:23] should have had a diagram of it because I don't know how familiar you all with [8:26] the treatment plant. They were the old u clar jester tanks that we destroyed. [8:32] That's where the sludge tank. So we ended up pumping it in [8:36] into the aeration basin and put it on pace's responsibility to uh look at at [8:44] uh processing it. There's a couple of pictures. Uh well, next down here on the [8:51] disposal options. So, we looked at several disposal [8:55] options. Obviously, one was with the city to do it. I think the cost of [8:59] disposal would have been in the $30,000 range. [9:02] » 3040 >> 3040,000 [9:04] » disposal cost. >> Just disposal cost. But we're also [9:08] looking at the time for staffing to do it. We possibly would have needed other [9:13] equipment besides equipment they had. and typically pump rentals about $20,000 [9:20] a month plus the time issue was out there. So, we looked at three other [9:24] options. Option one was the geo bags. That's what Tim has been using for many [9:31] years now to dewater sludge out of their base. They're just basically big bags. [9:35] We pump the sludge in. They're a mess material. They let the water go out, but [9:40] they keep the sludge in the bags and in water. Pace looked at portable presses [9:46] too to come in and use that. That cost was about threequarters of a million [9:51] dollars estimated cost. And then we looked at Lakewood Hall and that cost [9:55] was about a million dollars. So we ended up deciding to go with the geo bags [10:03] and a couple of pictures after that. I'll show you these here very quickly. [10:11] Um, excuse me. Those are the tanks with the [10:15] geo bags in it. You basically put them in a dumpster. You fill them, you let [10:19] them be water, and then they're hauled off. [10:23] Um, this picture here is of all the sludge that was in the basin in there. [10:28] And you really can you can see some of the debris in these basin, but these b [10:33] this thing was full of debris. Um, that's non-organic matter. [10:39] Then the final picture here kind of shows you you got the the uh they had to [10:45] bring in a a grain in there to mix the basin continuously. You see they have 1 [10:51] 2 3 4 5 six geo bags in there. That's how many they would fill at a time. And [10:58] they've been working on it about two and a half months now to try to get the [11:02] sludge out. and that we're asking for an additional time extension mainly related [11:07] to the time it's taken them to get the sludge out because they can't until they [11:12] got the sludge out they can't finish work on the phase 2 part of the project. [11:18] If I'm going too fast, let me know if you have any questions on that. And I [11:23] and I feel that they were very diligent in their efforts to do this work. That [11:27] Pace has been a good partner with us throughout this job [11:32] looking at keeping cost down. Initially, we thought the cost would be 700 70,000 [11:39] to $100,000 maximum, but the amount of sludge in these basins and the [11:44] concentration was a lot greater than we anticipated. We had some experts come [11:48] in, look at it, give us an estimate on it. Um, uh, Blue Blue, [11:55] » Blue River Technology, >> Blue River Technology. They provided the [11:58] the bags. They came and gave us an estimate on the number of bags. And it [12:02] actually has taken us twice as many bags as we thought originally. And they have [12:07] been dewatered in well. They're not they're not sloppy with the sludge that [12:12] they've sent out. They've had good solids concentration. So we've been [12:16] watching it and we feel PACE has performed very well. So right now what [12:21] we're looking at is a potential change order down last change order um down the [12:27] road once they finish the work of about $175,000 [12:33] the city cost and they're looking at about $350,000 [12:37] in total cost and we've calculated the amount of sludge. the city sludge is [12:43] about 50% of the total sludge in the basin. Um actually about 2/3 of the [12:50] water but half the sludge. So we looked at it pace is very agreeable to that [12:56] that split. So I just this is kind of letting you all know what's coming down [13:00] in the future and why. >> So we are anticipating this $175,000 [13:06] portion for the city will be a future change order saying. [13:09] » Yes. Um question. Are we going to is it scheduled to replace the liner of that [13:16] bileac as a retention basin once all this sludges out? [13:20] » Yes. >> Like it would probably be damaged in the [13:22] process. >> It's actually PACE has been very [13:26] diligent about it. They haven't um damaged the liner. We believe at this [13:30] point we got one other person to come in and look at it, but we believe that'll [13:34] be a credit to the city that we don't need to [13:36] » Oh, that we don't need to replace it. We don't need replacement. [13:39] » That's correct. >> Yeah. Yeah. I think we're all in [13:41] agreement that liner is in good enough shape to to do that to do that. So, PACE [13:46] is going to they have to do some welding. They have some cuts they have [13:50] to make into it. They're going to weld it. They're going to give me the total [13:53] bid package that they did at the beginning of the job and any remaining [13:57] budget they're going to credit back to >> when it's empty. I would like very much [14:01] to have that documented formally that it was inspected by you know the [14:06] engineering team and pace and the contractor um and wastewater staff and [14:10] that it doesn't at that time need to be in place. I would like to have that on [14:14] record just for reorder and everything else that we have going on. [14:17] » Yeah. Yeah. >> Uh that will be I think there's five [14:21] lights in the bottom of the basin this weekend this week. So we should be by [14:26] next week ready to go with that. But everything we've seen and I'll document [14:29] it, the liner looks in very good shape. >> Honestly, with the status of the plant [14:34] the way it was, I'm not surprised that there was, [14:37] you know, um, significantly more dried and debris [14:42] » in in both the CLA digtors and that you [14:48] » Yeah, Pace actually had to bring in what we call a chopper. They tried to use a [14:52] typical pump, uh, centrifugal pump to do this or PD pump, but there was so many [14:58] rags, everything was clogging up, so they had to bring in a chopper pump, [15:02] which is basically a pump with a chopper blade on it to grind this all up to get [15:06] it even into the bags. >> I'm not terribly surprised. Do you guys [15:10] have any questions on the sludge disposal presentation? [15:14] » Thank you, J. >> Very thorough. Thank you, J. [15:16] » Thank you. Um, next, uh, I will talk about change order six. First, I would [15:22] like to talk a little bit about [15:28] Tim's handing out a summary of all the past change orders that we've that you [15:32] all have approved, we've recommended, and you all have approved. [15:46] So, I've kind of kind of I've outlined where the of the previous change orders [15:51] had gone to what they were. So change order one that was just a change order [15:58] for updated vacant Davis vacant wage rates. There was no cost related to [16:03] that. That was just we didn't have the right amendment but the costs were the [16:08] same in that change order two. Um we bid this job prior to getting the final [16:15] comments from IDM the Indiana Department of Environmental Management. We had a [16:20] few minor changes that had to be done to a couple of pipes and that cost was [16:25] $7,361 [16:28] 95 cents that you all approved. Excuse [clears throat] me. Change order [16:34] three. This one was related to two items. One was a diffuser manufacturer [16:39] change um based on my recommendation to to the board and then cascade aation [16:46] system expansion. uh we felt that it was it was important to go ahead and build a [16:51] second cascade aation system to help with maintenance as well as future and [16:56] we talked about this and I think everybody agreed that it was a good [17:00] improvement. I will tell you the diffuser manufacturer while I won't go [17:04] into specifics I am so glad we recommended and you all did that. I have [17:09] another project out in Florida where I'm actually after three months having to [17:14] take all the aation basins out of service to redo the diffusers. Um so I [17:20] think this is providing y'all will provide you all real value by going with [17:24] a different diffuser that we recommended. [17:28] Um change order four two elements to that. There was the [17:33] portable sample samplers, the CCTV truck we purchased for you all, the Knox boxes [17:39] for emergency uh access to the plant and the power line relocation. That power [17:46] line relocation had two uh purposes. One was for the expansion of the road and [17:52] the the additional road that that River Ridge is going to do, as well as we were [17:57] getting it out of the way of one of our our entrances. it was in the way of [18:02] that. So that was $462726.52 [18:08] for that. And then we had some electrical field order changes. [18:12] Always in these type of jobs when we get shop drawings in there always are new [18:17] updates and changes especially on electrical area. So we had to do some of [18:22] that. the wet weather pump station. We had to reconfigure that design because [18:27] the pumps that we had bid weren't going to work properly. So, we looked at that [18:32] and changed that. [snorts] Um, Indiana American Water uh wanted some different [18:38] changes to how we were connecting to their water system to the new plant as [18:43] well as paving concrete changes. That was actually a credit to the city. Uh [18:49] but those those costs were $22,115.13. [18:56] So those were design coordination changes that were done during [19:00] construction. Change order five for $447,237.74. [19:09] Those were related. $313,6867 [19:15] of that was due to Riveridge Development Authority. They wanted to bring some new [19:20] pipelines in. They had a new pump station. So, we had to reconfigure two [19:26] 16inch pipes plus >> right [19:29] » two 16inch pipes. >> They're they're going to 18. They're [19:31] 18s. >> They're 18s. Yeah. Going to 18 in, [19:34] [clears throat] excuse me. and we had to modify our influent uh box [19:39] [clears throat] for all everything comes into with new valves and stuff. So that [19:42] was related to a request by River Ridge for uh new new lines coming into the [19:48] plant. We had the furniture package for $58,85010 [19:55] and then the blower 2 wrapping that was $9,000 [20:00] $75.13 and that was more um part of that was to [20:06] replace the windows that were bad, but we wanted the the blower building we had [20:10] kept it as a block building and this is a separate building that was existing. [20:15] Everybody wanted it to look the same as the other buildings. So, we issued that. [20:21] Part of it was some things that we needed to do to to eliminate some [20:25] windows and things out of the building, which was a plus plus to the building. [20:31] And then that one, we actually had some design changes as well as credit. So, [20:36] that ended up at $15,5549 [20:41] of credits back. But there were some there were some ads and some credits in [20:46] that change order five. [20:50] Mayor you. >> Yep. [20:53] » So that's kind of where we are with the change orders today. We're presenting to [20:58] you change order number six for your consideration. [21:02] Change order six has uh several things in there. It has modifications to the [21:07] the feed line to the dewatering building. Uh we after talking with Tim [21:13] uh there's a real long line from the storage tanks down to the dewatering [21:17] building. We we wanted to put flushing connections on that line because when [21:23] when they don't use them, the solids can accumulate and dry out. And that's [21:29] something I we just didn't get in the design. And as we were building it, we [21:33] were like, "Oh, we need to have these flushing connections." Uh, we added we [21:38] made some changes to the Gordon RUP RA pumps to make them work better. Um, with [21:44] the head conditions that we had that was like 9,000 [21:48] Let's see. That was $9,000 9,300 [21:53] [snorts] uh $9,347.75. [21:59] Uh we on heat tracing um in the headworks and at the clarifiers [22:05] um we did not have the electrical portion of the heat tracing in the job [22:10] uh requirement. So we had to add that. This is water pipes that are exposed to [22:15] the atmosphere and I don't know if any of youall saw the pictures this winter [22:20] of of several inches of ice on our system. So we had to heat trace that uh [22:27] effluent samplers were relocated from the UV disinfection structure to the [22:32] cascade. We had the effluent struct the effluent samplers in the uh UV [22:38] disinfection structure but because of the depth of it and stuff it wasn't a [22:43] very functionable option. So we ended up moving it to the cascade air raators on [22:49] its influence box to make it more accessible. [22:54] Uh then again as typically there were multiple electrical field changes we had [22:59] to make to accommodate shop drawing changes as we get it in and those things [23:04] are just that's part of our part of happens electrical system codes all [23:09] those things change all the time and we had to update and those electrical field [23:14] changes were at $40,362.11. [23:19] And then the biggest one is the 138 day time extension. That's a no cost time [23:25] extension from PACE. And that's really related to the sludge. Until they got [23:30] the sludge out of the basin, they can't finish the phase 2 work because they got [23:35] to do some big digging around the bilac basins, the airrated lagoons. So that's [23:42] their request is for 138 days. I talked to Pace and Tim. I talked to Pace and [23:49] they're pretty confident that's the elastic extension they'll need um on [23:54] this project and again it was all related to the sludge [23:58] um here. So right now we're looking at a substantial completion um well that [24:04] didn't get changed May 16th I have to correct that. That should have got that [24:10] didn't get changed. But October the final completion [24:15] uh is October 31st, 2026 is what they're projecting at this point time to be out. [24:22] And unless there's some issues with excavation, I don't see why. All the [24:27] equipment's on site and ready to go. The electrical there, so we should be ready [24:32] to finish this project out in a short time frame. [24:36] » Some questions. >> Yep. Oh, please. [24:40] » Um, the digest line makes sense. >> Why should I keep it keep it clean? Um, [24:46] the pump modifications, I understand. Headworks heat tracing. I get that. And [24:51] even the effluent I was out there yesterday, even the effluent pump [24:54] sample, the relocation to the cascade makes perfect sense. It's much easier to [24:58] access. Probably safer even. Totally fine. [25:02] » Um, the the electrical stuff though. I have some questions on the electrical [25:08] stuff. Um I understand the orders issued to address the the equipment control [25:14] changes when we change equipment. If there's a change in electrical [25:17] electrical work, I understand that. >> Um especially with the the decision to [25:21] relocate the sample pump >> to the [25:25] » and then the the layout. What I don't understand is the [25:30] um conduit for power. I mean the heat [25:33] trace. I understand some of this. I don't understand because I I don't know. [25:37] I feel like it should have been accounted for, but then I heard you say [25:40] something about maybe a code had changed a lot. So, if you could address that. [25:44] » What happens with electrical? So, we got a lot of major equipment here. What the [25:49] electrical uh engineer does is we get ch we get proposals from the con from the [25:56] equipment suppliers, not the contractor equipment suppliers during design. They [26:00] develop their systems based on those submitts to us during design. Once we [26:06] get into shop drawings and I don't know if you all the difference between when [26:11] we design something, we reach out to the manufacturers that that that we're we're [26:17] looking at using using for pieces of equipment and we get information on how [26:22] the electrical system is, how the circuits are running, all that type of [26:26] stuff. And we design about around one system, but when you bid it, you have [26:32] multiple systems that are allowed to bid. If somebody else bids and also [26:37] these people are always changing electrical designs in their system [26:42] because of code, safety, different types of relays happen. There's just so many [26:48] electrical electrical design requirements, construction requirements [26:52] are changing almost uh I would say almost monthly on it. So [26:59] when we get shop drawings in from the contractors on actually how they're [27:03] building their panels, how do we need to wire it, there's always changes that [27:08] have to be addressed because of the difference of what we did during design. [27:12] As you got to remember, design was started almost three years ago. And now [27:17] we're into bidding and actually constructing. There's always changes and [27:22] most of these are related to I can get you more specifics on those. I'll be [27:26] glad to do that. >> Just curious because it is the heftier [27:29] of the >> Yeah. increases through here. So I'd [27:31] like to make >> Yeah. I think over over to Yeah. Wet [27:36] weather pump station. I would say we're about $100,000 to $110,000 [27:41] total of electrical. I'm not talking about the the circuits and the heat [27:46] tracing, but >> we're about$1red to $120,000 [27:51] worth of field orders on electrical. And I in my experience on a project of this [27:56] size that is well within norms for our projects. [28:00] » And then I have another question kind of un unrelated to this but also looking [28:04] forward to anticipating any potential other increases outside of the 175 that [28:08] you talked about from the sludge removal. When I was out there yesterday, [28:11] um, in the building where the hydronneumatic tank is, one of the pumps [28:16] was >> out and I asked him about it because it [28:19] was sitting outside and he said there was a manufacturer flaw with it that was [28:23] causing the bearings to go bad or something [28:25] » and that the one of the recommendations had been potentially to downsize that [28:30] pump and if that cost comes to us. So my question to you is if it's a it's a fa [28:35] if it's a faulty piece of equipment, if the bearings are going bad, would we not [28:39] have a warranty on that? Would we not want to um get the company that provided [28:43] it to replace that at cost rather than us having to downsize and then incur [28:48] additional costs? >> There's a couple elements to that. One [28:51] is the bearing cost. So the manufacturer is telling us that we're running that [28:57] pump um outside of preferred operational range. Okay. [29:03] » So that's one thing that we still in discussion on that. The when we designed [29:09] the plant, we looked at the plant water system needs for a 4 mgd facility. [29:16] Obviously we're a 4G facility, but we're not running in 4G, [29:21] » right? >> So what I'm thinking and we're still [29:25] we're not complete with this. So, we're talking with Penn, which is the [29:29] supplier, about bringing in a smaller pump so that we can more match the [29:35] existing flows today. Like right now, you're only running one screen. I mean, [29:40] one belt filter press. You don't need both screens. [29:43] » Those demands are 60 gpm. Um, so we're looking at the potential of putting a [29:49] smaller pump in to better match today's flows and then having the larger pump [29:54] for the larger flows. So you would keep the larger pump in place and install a [29:57] smaller. You wouldn't replace >> smaller and the small other pump is to [30:01] look at getting it repaired and then put that in as a spare. [30:05] » Okay. >> So for the future. So we're not there [30:08] yet, but it is something we're looking at. We're we've been talking with Penn, [30:13] which is the pump supplier for the past six weeks trying to figure out and we're [30:17] still waiting on a proposal from them. Okay. [30:19] » So when I get to that, we'll get with you on that. We're also having troubles [30:24] with the the colar um blowers. No, the uh Atlas Atlas cob blowers. So, [30:32] we're still tracking that down. That's all under warranty. So, we're working [30:36] with the contractor. Pace has always been pretty reliable. Also, we have some [30:41] control issues with the UV that's coming in [30:45] » that that is based on manufactured defect and they are going to rectify [30:49] that at no cost. So those are the three major issues we have in today I believe [30:57] with the phase one construction that we're still tracking down and coming up [31:01] with solutions and getting thing as well as the emergency power um uh paces [31:09] electrical missed all the surge suppression devices throughout the [31:15] entire plan. Um they are going to be starting to be installed. [31:19] » They are in They already are. Okay, that's good because every time you would [31:23] go off on emergency generator, Tim would have to come out and restart equipment [31:28] because it wasn't. >> Okay, that's [31:31] » Yeah. So, >> so where our original contingency was 4 [31:34] million >> four Well, it's that's a hope that Yeah, [31:40] it was about 4.5 to 4.9 million. Okay. >> Uh depending on some of that cost I [31:45] think was for repayment of past bonds. So, I'm quite not sure, but it's [31:51] somewhere around the $4 billion was the contingency amount. [31:54] » So, with this change order and then even the future anticipated with this sledge [31:58] removal, we're still looking at having about 2.1 and some change remaining in [32:02] that contingency. >> If my numbers on the total contingency [32:05] are to correct, it's little confusing. I think D you know that it's a little [32:10] confusing. And the the percentage of this though is for 4.12% of the overall [32:15] construction cost. Everything to change order six. [32:18] » Yes. With change order six. And again like around 3.25% [32:24] of that has been for CCTV trucks things. And we're needed. [32:29] » Yeah. The things that you all needed which I'm glad we were able to get all [32:33] that equipment. >> Any other questions for Jim? [32:38] I get you. >> Okay. Thank you all. Thank you all for [32:42] being you heard all this and >> Yes. Yeah. [32:46] Yeah. Just a a couple quick comments. Uh going back to the sludge cost increase. [32:52] I concur with everything that Jim has said. Obviously [32:56] going through a learning period. If we haded to do over again, hindsight's [33:00] easy. We might do something a little different. But based on the options that [33:05] Jim presented, we all worked together on. We chose the best option. [33:09] » They just come with a cost. >> Why when you're dealing with something [33:13] of this magnitude and as old as it was, we we that's why we have contingencies [33:17] in place. >> Right. Exactly. Yes, ma'am. [33:20] » It's not like it's it's over what we anticipated in the sense of we have this [33:24] built in. >> Right. [33:25] » Okay. >> Great. [33:26] » All right. Um if there are no other questions, I'll entertain a motion to [33:29] approve change order number six as it was presented. That includes the [33:33] extension of time through. >> Yeah. And we're gonna before you sign [33:36] it, excuse me, I'm sorry, mayor. I'm gonna have to finish the substantial [33:40] completion date that it's May 16, 2026. So, I need to update that [33:46] » before you sign it. >> Okay. Okay. [33:49] So, with that amendment too, the actual paperwork is what? [33:54] » Make a motion to approve as presented with the amendment. Nation makes the [33:58] motion correct. >> Michael Grayson seconds. Any other [34:02] questions? Hearing none. All in favor say I. [34:05] » I. >> I. [34:06] » That is unanimous. Let's make sure there's not another extension needed [34:09] though. >> I'm ready to have this happen. Me, too. [34:14] » Okay. With that said, I think that's everything unless Brad has anything for [34:17] us or Donna has anything additional. >> All right. Just need a motion to [34:21] » make a motion to adjourn. >> Grayson makes a motion. [34:24] » I'll second. >> Gra second. All in favor say I. I [34:27] » I opposed. All right, we're journed.