[3:50] The floor is yours, sir. [3:50] Thank you very much. [3:54] Good morning everybody. [3:55] My name is DR. Franklin Hodge, [3:57] chair of the Public Improvement [3:58] Commission and I call to order [4:02] the securing of JULY's 17 20 25 [4:02] extra. [4:03] Let me get you please take the [4:05] roll call. [4:06] Certainly. [4:09] Would the representative from [4:10] the Public Works Department [4:11] please state their name for the [4:13] record Franklin Large Property [4:16] Management Department please. [4:17] The same dose of Calahan [4:21] Transportation Department for [4:24] Inspection Services Department [4:28] Railroad Water Sewer Commission [4:29] and Stepmoms and Commission for [4:35] Persons with Disabilities. [4:39] Early on we heard you barely [4:40] we're all set. [4:43] We are full quorum. [4:43] All right. [4:44] Thank you very much. [4:46] We'll get right into the agenda [4:47] starting with the hearing [4:47] minutes at the request of the [4:48] Public Improvement Commission [4:51] staff, the acceptance minutes [4:52] of the hearing held on JUNE 26 [4:55] at twenty twenty five during [4:56] your motion to approve the [4:58] minutes before the hearing [4:59] minutes of JUNE twenty six [5:03] twenty twenty by backing all in [5:06] favor I I and us are staying so [5:10] move on to a utility pole [5:10] hearing and continued on a [5:14] petition by Verizon New England [5:14] Inc. For utility pole [5:17] installation to install one new [5:18] private utility pole within St. [5:21] Roch Street to be located [5:21] southwest side address numbers [5:25] thirty six to thirty eight [5:25] generally between Bluegill [5:26] Avenue and Maple Street. [5:28] This had its previous hearings [5:32] on JUNE 12th and again on JUNE [5:33] 26 be to introduce themselves [5:36] their affiliations and let us [5:37] know how you would like to [5:41] proceed with this item. [5:41] Yes. [5:42] Good morning Commissioner [5:44] Rossmiller representing Verizon [5:45] winningly I apologize my video [5:46] wasn't working here and I can't [5:47] figure that out regardless [5:51] we're going to withdraw this [5:52] petition as is we did come up [5:55] with a new solution which will [5:56] be sent out to a Buttars and I [5:59] believe that should be heard on [6:03] the AUGUST 14th meeting which [6:04] might be the next one I believe [6:07] or it's slated to anyway. [6:07] That's the current plan. [6:10] So we're going to withdraw this [6:11] petition as it is now. [6:12] >> All right. [6:15] Todd, I know I ask you this [6:16] every time do you need a formal [6:18] motion to accept the withdrawal [6:18] ? [6:19] Yes. [6:19] All right. [6:22] I making a motion to accept the [6:25] withdrawal I and no one I'll [6:26] make a motion to accept the [6:30] withdrawal of petition for [6:33] utility pole on as extreme as [6:34] written directed by the back in [6:37] our favor my opinion polls are [6:41] saying so we'll see you back [6:44] here for that one in a few for [6:45] the report to that in a few [6:49] weeks on two utility pole here [6:51] No one on a petition by ever [6:52] source energy for utility pole [6:53] installation to install one [6:56] nutriment utility pole with a [6:57] guy wire attachment within [6:58] heartwood street torches to be [7:01] located on its northerly side [7:03] and address number eighty five [7:04] generally across from Spencer [7:05] Street the privilege please [7:08] introduce themselves, their [7:09] affiliations and talkfests. [7:09] >> Do what you really want to [7:10] do. [7:12] I Good morning. [7:13] It's Katie Florini representing [7:16] Everson's Electric and yes we [7:17] would like to install one pole [7:18] with an anchor guy near eighty [7:20] five Beat Street and it's [7:21] necessary to supply electric [7:23] service for new construction at [7:24] the Welcome Home Harbor Street [7:28] Income District in new homes. [7:32] I do want to share the plan so [7:33] that you can have a look at [7:33] where we would like to install [7:39] the pole so choose the one that [7:43] cut your screen. [7:44] Choose that I don't want to [7:48] screen choose out and no hit [7:50] show there it is. [7:57] Can you see the plan? [7:57] >> We can yep. [8:00] Ok so this is this is the [8:01] location right here where we [8:04] would like to install the new [8:05] pole and then the anchor guy [8:08] would be behind it to offer [8:09] support for the existing poles [8:11] and wires. [8:12] So yes I'm going to interrupt [8:15] please. [8:16] This is Kelly Correo. [8:17] I'm sitting here with Katie and [8:20] there's a new construction for [8:20] the housing at eighty four [8:21] Harward Street right down here [8:23] at the corner. [8:24] And Spencer, currently our area [8:26] lines come from this wall here [8:27] and go down the street to this [8:28] pole here. [8:31] So we're in the way of the [8:31] corner of the building. [8:34] So by cutting a pole across the [8:35] road we can redirect our area [8:38] lines to go here and and follow [8:39] down the street because from [8:40] this pole here they actually go [8:42] diagonally across. [8:43] So we're just bringing them [8:44] here out of the way in the new [8:45] construction and then down the [8:49] road this way I'm sorry I'm a [8:50] little bit confused. [8:53] >> Are you to you're crossing [8:56] the street with the wire and [8:57] then you're continuing are you [9:01] then crossing back or how is [9:04] this woman Rassilon So these [9:05] two lines here forty two feet. [9:08] Fifty two feet those are just [9:09] measurement lines just from the [9:11] existing pole to the new polls. [9:13] Ok, and so our area wires [9:16] currently come up Spencer [9:16] Street this way to this pole [9:19] and then they go down Halvard [9:20] on this side of Harvard to this [9:24] pole then over here they go [9:27] across the road so because the [9:27] building corner is right here, [9:30] this area line is in the way or [9:31] too close to the building. [9:34] So by putting a pole over here [9:35] ,airlines will come up Spencer [9:38] Street, they'll cross to a new [9:39] hall and they'll continue down [9:41] on this side of Harvard. [9:42] I see. [9:43] Ok, so they're going to they're [9:46] not they're not I think that [9:47] was a question I have is are [9:50] they crossing over and then [9:53] crossing back and it sounds the [9:54] answer to that is no. [9:57] They're going to cross one. [9:58] Does that mean you'll be moving [9:59] one of these two poles that are [10:01] existing? [10:03] We're not the only one on pole [10:06] ten so I would have to go back [10:07] to my engineers. [10:08] The design was just ah like the [10:09] pole in our area lines here. [10:12] I can certainly follow up and [10:13] give you that answer but i [10:16] don't have it at the moment. [10:18] Ok, yeah I think that would be [10:21] helpful from my perspective. [10:22] I mean you know we obviously [10:25] understand the suppose the way [10:25] housing construction we got to [10:26] we got to move it out of the [10:26] way. [10:29] I think my initial reaction to [10:30] this is just that you're adding [10:33] a whole and a support structure [10:37] in a you know, already fairly [10:37] narrow sidewalk condition and [10:41] so that does impinge on [10:42] accessibility for the area and [10:46] so ideally if we're going to do [10:48] that, it would be you [10:49] especially given the nature [10:50] of how you're rerouting the [10:52] wiring we would at least free [10:53] up some sidewalk space in an [10:56] adjacent area to support some [10:57] of the other you know, just the [11:00] passage. [11:01] I guess that's a good thing. [11:04] I would prefer to see you guys [11:05] trying to chase down an answer [11:08] to yeah. [11:09] And I can I can find out like I [11:12] said, my engineers not in the [11:13] office at the moment he is [11:16] working today so it's something [11:17] probably by the end of the day [11:20] I could let you guys know so [11:21] for the sake like not holding [11:21] up the hearing we're still [11:23] looking to install a new poll [11:24] to get those wires out of the [11:27] way anyway. [11:28] Everybody who is on that call [11:32] is encouraging the corner so [11:33] like it has to be every one to [11:34] remove the trespass right on [11:38] the border. [11:42] I would tend to think so maybe [11:43] all the lines go between those [11:45] two poles so you removing half [11:46] or whatever it is it removes [11:50] only half the problem. [11:51] So yeah, I think that we're [11:51] right. [11:53] Can interested in everybody [11:57] else committing to this move [11:58] and then it seems like we'd [12:00] have enough people out there [12:01] who are we still have a [12:04] trespass. [12:05] Those are the only two options. [12:06] Yeah. [12:08] And I don't I don't know really [12:09] could actually trespass is on [12:09] the property. [12:10] I know there's certain codes [12:13] that the electric wires have to [12:14] be x amount of feet away from a [12:14] building. [12:17] I don't know that cable or [12:17] telephone because they're not [12:21] energizes electricity MAY not [12:21] have that same requirement so I [12:24] don't know if they can stay. [12:25] But again those those are [12:26] questions I just I'll have to [12:29] find out today and get back to [12:30] you guys on I think we want [12:31] everybody moved over right to [12:32] that we want to creating ways [12:36] to go around this. [12:36] Right. [12:37] Like so that this is cleaned up [12:43] more understood and you explain [12:44] the guy's situation so like [12:47] what are you walking under now [12:48] right. [12:51] Like is that going diagonally [12:52] from the pole to the sidewalk [12:55] so that no so so near the top [12:56] of the pole there'll be a metal [12:59] arm and it goes straight [13:00] backwards and then the [13:01] guidewire itself will come [13:04] straight down so that you can [13:07] walk underneath it like [13:08] housesit it without it being in [13:09] your way as opposed to like [13:12] some of our old ones it would [13:13] be a diagonal and would cut [13:13] right across your path. [13:14] >> All right. [13:15] We will need to know the [13:16] clearance between your pole and [13:19] the guy who so like so the guy [13:22] the guy is just a little wire. [13:23] It looks like an eyeball that [13:24] goes into the ground. [13:25] The anchor and the wire [13:27] attaches to that so that only [13:28] takes up an inch or two a [13:31] sidewalk space. [13:31] The pole itself will take up [13:32] about twelve. [13:35] So right here I have a four [13:36] foot seven inch clearance but [13:39] the sidewalks only like wide [13:39] enough to allow for that. [13:42] We actually did take [13:43] measurements. [13:44] I was out there with Katie [13:44] yesterday. [13:46] Can you pull a I'm going to I'm [13:47] going to show you the [13:50] measurements on the other [13:54] fixtures out on there so I [13:55] don't know if this is like big [13:58] enough or hard to read but this [13:59] pink right here is the proposed [14:02] pole and I have a four foot [14:03] seven inch clearance here this [14:06] blue is just the width of the [14:07] sidewalk in that area five feet [14:09] ten inches. [14:10] So my pole is going to take up [14:13] like 12 to 13 inches. [14:14] My girl take up one to two [14:18] inches the pole next to it [14:18] there's concrete light pole [14:21] that's only four feet seven and [14:22] a half inch between the pole in [14:25] the back of the sidewalk. [14:26] This pole down here at the [14:27] corner. [14:29] Waterlow, you are ten inch [14:30] clearance and the next one down [14:33] has four seven which will be [14:34] the same as what we're [14:35] proposing here and then the one [14:37] up on the corner here there's [14:38] only a four foot clearance [14:40] between the pole and the wall [14:41] and it's just I mean that's [14:42] that's the width of the [14:44] sidewalk. [14:45] That's all it allows there. [14:48] So we know ideally we want five [14:49] feet but there isn't anything [14:49] over there that can make the [14:55] five feet. [14:56] I mean it's it's not any less [14:59] than what's already out. [15:00] Yeah. [15:00] I mean I appreciate that. [15:03] You know, obviously what we're [15:04] talking about is already [15:06] suboptimal condition and I like [15:07] something additional to it. [15:08] So I think that's that's a [15:08] concern. [15:11] I just trying to you know, [15:15] other simple things like I hear [15:15] yeah. [15:15] Yeah. [15:21] Are you able to hear me now [15:29] like you had no idea Katie and [15:32] Kelly can you hear me that he's [15:41] talking or nobody in my mind? [15:44] Ok, I'm sorry if you guys were [15:45] talking we couldn't hear you [15:49] are you able to hear us now? [15:49] Yes. [15:55] Ok, I'm on so sorry about that [15:56] . [15:56] >> No words. [15:57] So I appreciate you taking [15:58] these measurements and [16:00] providing context and obviously [16:00] you know there's nothing in [16:04] here that is ideal and I think [16:04] the reason for the questions [16:07] and concern is just adding [16:10] another another suboptimal [16:11] entry point condition to an [16:14] already constrained street and [16:16] so, you know, the precedent is [16:19] still context that we're not [16:20] necessarily making the overall [16:23] travel more narrow. [16:24] It just it's a reason for [16:24] concern to add anything else [16:27] frankly at this point to the [16:28] screen. [16:31] But I even said appreciate that [16:32] the reasoning behind this and [16:35] getting clarity on whether we [16:38] can eliminate, you know, one [16:40] existing polls would be one or [16:43] both of existing polls out [16:44] of the poll right on the corner [16:46] has to come out first [16:46] encroachment reasons. [16:47] But you know, in any case I [16:50] think understanding your move [16:51] to making sure that we are that [16:54] you are working with other [16:57] tenants on the poll to to get [16:58] over in terms of the guy's [17:02] situation. [17:03] And so there's all that extends [17:06] perpendicular off the [17:07] sparkplugs and perpendicular [17:09] off the you're installing and [17:10] sort of crosses over the [17:14] sidewalk zone and then a guy [17:14] wire drops down. [17:18] Do you know what that ball is [17:19] mount the support pole is [17:19] mounted off of the wooden all [17:31] the air sawing no that are [17:31] we're having a hard time [17:42] hearing, you know, I'm not sure [17:43] you know now I can hear you can [17:46] I can you hear me on this one? [17:46] Yeah. [17:50] Apparently not. [17:51] Now we can hear you we can hear [17:53] you over there. [18:01] Ok, I'm so you're very fair. [18:02] I think we can hear you through [18:03] Katie's computer through yours. [18:04] >> All right. [18:19] No to fade oh oh oh can you [18:19] hear me? [18:22] Yes we can hear. [18:23] Here's my computer which [18:27] started to turn my speaker off. [18:30] Ok, so sorry am I clear now? [18:34] Yes I can hear you. [18:41] Yes we can hear you this says [18:42] can you hear me? [18:45] Yeah we can hear you ok let me [18:49] just be ok so I'm sorry I was [18:53] just so close to the wires I [18:54] believe on the side of the [18:54] street like that across the [19:00] street we want height and then [19:01] along the sidewalk I think it's [19:04] extremely so that metal bar the [19:08] door why would be attached to [19:09] could be right up around that [19:12] 64 eye on the ball even if it's [19:16] a little lower even if we go in [19:19] telecom space it's still going [19:20] to be like well above you know, [19:24] anybody's headspace or any kind [19:27] of sidewalk vehicle type thing [19:31] if I die, ok, so there'll be a [19:32] bar extending perpendicular [19:35] from the pole with a wire drop [19:38] them down but basically the [19:39] height of the pole of the bars [19:42] but roughly 16 feet above the [19:43] sidewalk I believe so they're [19:56] usually 12 to 16 got to ok, [19:57] commissioners, other questions [20:00] comments. [20:01] Yeah I think our street lights [20:04] are spread out here on and so [20:05] when you put a pole up you're [20:08] going to come up into our [20:11] aerial view of street lights [20:14] running along that sidewalk. [20:18] I saw the concrete poles. [20:19] I didn't see any area wires on [20:20] that side of the road. [20:25] I mean there in your picture [20:26] but the walls yeah. [20:29] And they're they're like daisy [20:32] chain along the top right. [20:33] Our street lights are because [20:37] we clearly probably have some [20:37] sort of severed subsurface [20:38] connection. [20:41] I'm so currently I believe [20:42] they're being fed overhead. [20:45] I see your poles going to kind [20:46] of come up in the middle [20:48] of that Golos Google Maps again [20:50] because I don't remember seeing [20:54] the area like that. [20:55] I was looking at your photo [20:58] with an x on where you're going [21:05] to place the out there Mr Guy. [21:06] It's just connecting our to [21:10] street lights ok. [21:13] Yeah Amy is right. [21:14] They just focus on the most [21:17] recent imagery from MARCH [21:18] of this year and there is an [21:19] overhead street light feud [21:39] between two peoples overspender [21:44] at the corner of event quite [21:44] well. [21:45] Quite a possible way. [21:47] Yeah. [21:50] And so I for would be a [21:51] priority for the at the corner [21:55] tonight that's got like all the [21:58] service to the whole [21:59] neighborhoods and other [21:59] streets. [22:05] It's that whole Yeah. [22:06] For ten that's the one in [22:10] question I could come out the [22:11] other one at the corner has to [22:16] stay of is there any way to [22:21] stop. [22:22] So I'm sorry I thought before I [22:27] the coming out with the no no [22:32] you think problematic we're [22:36] pushing the water forward we're [22:37] not I suppose around that [22:44] corner I'm sorry that I didn't [22:49] I'm that concerned about on the [22:50] battering ram there it is not [22:54] nearly impossible but what if [22:57] you're already so on that's [22:58] been there for a very long time [23:01] like I said that feeds the [23:01] whole other into how it goes [23:02] down. [23:08] Spencer, we have no plans for [23:08] us. [23:12] I'm confused then why we're [23:13] adding another call on the [23:13] other side of the street. [23:16] One is the encroachment we're [23:16] solving a stockholder's [23:19] intended to stay there with all [23:20] of the attachments currently on [23:20] it. [23:24] Why are we putting another [23:24] right now on the opposite side [23:28] of the street right now we're [23:29] building a building here they [23:31] are coming right up to the [23:32] property line guidelines. [23:35] Are we building right now our [23:39] lines up Spencer they go down [23:40] hard right here and then they [23:43] Crossharbour we have to get [23:46] this out of here. [23:47] So I type this and bringing [23:50] them across here and over we [23:57] eliminate this right here are [23:58] diagonally from the pole across [23:59] the street. [24:02] So they're there moving in the [24:02] direction away from the [24:05] property line. [24:07] The wires right here they're [24:12] going to go this way and down [24:16] right now here and say the [24:17] crossing over the block, the [24:20] crossing of the area wires is [24:20] currently diagonal and with [24:24] this pole in the removal of the [24:27] intermediate pole along Halvard [24:28] Street that crossing will be [24:32] directional. [24:32] It'll be straight across [24:35] Harbord at Spencer Street. [24:36] No, I understand that it's a [24:39] bit I guess I'm just trying to [24:43] understand how the diagonal [24:44] crossing is impinging on the [24:44] right of way but the pole [24:47] itself is not. [24:48] Is that what you're saying? [24:49] It's just like the very tip [24:51] of the corner the diagonal cuts [24:52] across. [24:55] Yeah. [24:56] So before you get to the [24:59] diagonal so is pull the spine. [25:00] These wires come next to the [25:02] building down the street here. [25:06] We need to move that these go [25:07] to this pole here then they [25:10] cross the road. [25:11] We're going to cross the road [25:16] here and go down this way. [25:17] >> Yeah. [25:18] No I understand what you're [25:18] talking about doing. [25:21] I I'm just a little perplexed [25:25] is that the hole itself in the [25:25] wires coming into that hole [25:28] from Spencer Street do not [25:29] encroach but the wires sort [25:32] goldwing diagonally off that [25:33] hole it sounds like where the [25:36] encroachment issue is but the [25:40] from the resources perspective [25:41] the pole in the wires coming to [25:44] it ah it's a serious concern [25:48] for the ok got it. [25:48] Got it. [25:50] So if this is a development [25:51] parcel and we're putting [25:52] housing here there's going to [25:55] be an obligation for an [25:56] accessible sidewalk around the [25:59] entirety of this range. [26:00] So presumably this project will [26:03] either then be tasked with [26:04] having to relocate people that [26:07] were more as a part of the [26:08] project or they would have to [26:11] grant land right on the side [26:15] of the property to make an [26:15] accessible part. [26:18] So I think that if this corner [26:19] is going to become a housing [26:22] project where people will live [26:23] ,we are going to have to [26:24] figure out how we get an [26:29] accessible sidewalk around the [26:30] Arabo that would actually be an [26:33] entirely different corner [26:34] different line for us right now [26:38] we don't have any of that. [26:39] Yeah, no, I'm just saying that [26:42] this is all in service [26:42] of getting the encroachment off [26:43] of this right. [26:46] But by developing this we're [26:47] going to have to potentially [26:49] move that along on the corner [26:50] were impacted in some way that [26:51] we should probably figure that [26:53] all out before we start adding [27:00] falls about street. [27:05] >> I mean given that the only [27:05] suggestion I would have is can [27:08] we continue this to another [27:09] date and we can at least tell [27:12] our engineer how discussions [27:12] with the city and think about [27:16] what we want to do overall. [27:17] Yeah, I think that would be a [27:20] good course of action for you [27:23] know, just we're dealing with a [27:24] circumstance we're dealing with [27:27] the infrastructure that's [27:27] already creating problematic [27:31] accessibility conditions that [27:32] MAY need to be resolved in the [27:35] short term and if there's an [27:36] opportunity to both address the [27:39] existing accessible the issues [27:40] as well as the utility [27:42] encroachment issues together [27:43] that seems like a better use [27:44] of everybody's time and [27:47] financial resources then adding [27:48] yet another obstruction on the [27:51] sidewalk while still failing to [27:52] address the existing conditions [27:55] so I think we're happy to [27:55] continue this and allow some [27:59] time for sorting through the [27:59] options here. [27:59] All right. [28:06] Todd, our next hearing is [28:07] what's needed to live thirty [28:07] first. [28:10] All right. [28:11] Two weeks enough for a jury to [28:22] go to the one after that you [28:23] want to I'm sorry I took it [28:23] first. [28:25] >> Was that a question for yes. [28:26] I took my thirty first. [28:29] Did you person that's in two [28:29] weeks. [28:32] >> Yeah we'll take that if [28:33] we're not ready in two weeks [28:34] we'll let you know ahead. [28:36] Just continue it again all [28:37] right. [28:38] That sounds great to continue [28:41] to follow hearing number one [28:41] I'll make a motion to continue [28:44] utility pole No. [28:45] One until JULY thirty first [28:51] second all in favor ay ay ay [28:55] opposer I've seen so move all [28:56] on onto utility pole here in [28:57] number two and a petition by [28:59] our energy for utility pole [29:00] installation to install one new [29:04] Guidewire attachment to an [29:04] existing private utility pole [29:07] within Union St. Charles town [29:08] to be located on itself [29:09] peacefully side at the side [29:11] of 116 Main Street generally [29:11] shown generally south west [29:15] of Main Street is reintroduce [29:15] themselves, their affiliations [29:19] and let us know what you're [29:20] proposing to do here. [29:20] Hi, good morning. [29:22] It's key priority over Source [29:25] Electric. [29:26] We are asking to install the [29:30] hip guy to this existing pole [29:34] here and it's necessary just to [29:34] help provide additional support [29:37] to that existing home. [29:42] You have some pictures. [29:45] There's a pole I I be [29:45] approximately Gorry. [29:51] >> Yeah. [30:05] Plan. [30:06] All right. [30:07] Thanks very much Commissioners' [30:18] questions during none of this [30:25] stuff or the public I will [30:25] actually take this opportunity [30:26] to remind the public if you [30:27] wish to ask questions around [30:28] testimony, please use the [30:29] raised hand function at the [30:32] bottom of your screen. [30:33] The only question I have for a [30:36] resource now is just like you [30:37] to confirm that this guy wyo [30:40] will not be crossing the [30:41] pedestrian path of travel and [30:44] will land parallel to the curb [30:47] line is that that's my [30:48] understanding. [30:48] Is that correct? [30:51] Correct. [30:51] Great. [30:55] It's all I have. [30:56] >> How are you doing? [30:57] Your emotions are periods [31:00] utility pole here number two I [31:02] mean a motion to certain energy [31:03] for utility pole installation [31:04] and Union Street has been by [31:07] the traffic back and all in [31:07] favor. [31:14] I I I only oppose erm same so [31:15] moved on to utility pole here [31:17] number three petition by [31:18] Overservice Energy for utility [31:19] pole installation to install [31:22] one new guidewire attaching to [31:22] an existing private utility [31:23] pole within London St. Charles [31:26] time to be located on its [31:26] southeasterly side generally [31:28] northeast of Correas Street the [31:29] proponents space reintroduce [31:30] themselves, their affiliations [31:33] and office through what you are [31:34] proposing to do the morning. [31:36] It's Katie Flaherty from Ever [31:37] Source Electric again we are [31:40] asking permission to install [31:41] this hip guy to add additional [31:45] support to this poll on Molton [31:45] Street. [31:46] Well, it was right here. [31:52] It would go right here because [32:06] it's all co plan on missioners [32:11] questions, comments warm [32:14] welcome to doing from fiber [32:21] repair and back with that. [32:23] So is the confirmation that the [32:25] installation of the support [32:29] that so well repair damage with [32:32] this panel? [32:36] Yeah, typically we restore it [32:37] to substantially the conditions [32:43] and prior to if the increase [32:47] along with the other panel this [32:48] I can jump it actually this [32:51] location is within the limits [32:52] of work for the Bunker Hill [32:56] housing project and that [32:59] project is planning on doing a [32:59] bunch of sidewalk resurfacing [33:03] and in this area our source is [33:03] coordinated to my understanding [33:04] with that project so they're [33:06] not going to be in each other's [33:07] way. [33:07] But I think those sidewalk [33:10] repairs will be done by the [33:10] project. [33:14] People here did the Caroline [33:18] stay there? [33:18] Yeah, colourblind state is [33:19] remaining where it is on this [33:20] side of the street. [33:22] Some change changes on the [33:23] other side are happening but [33:33] not here already mysteries [33:40] other questions, comments, just [33:41] stuff. [33:44] And this is Mitchell just [33:44] hoping to get the same [33:45] confirmation that the guidewire [33:48] will not cross the path travel [33:49] and will fall in parallel to [33:55] the that's correct. [33:56] So promotion to the utility for [33:59] hearing me I'll make a motion [34:00] to approve a petition by Air [34:03] Force Energy for you Tels [34:03] Station in the street has [34:06] vendor manager backing all in [34:10] favor I I believe it doesn't [34:14] stand so so mu. [34:15] All right thank you very much. [34:18] Same time for a couple of weeks [34:18] for the first one. [34:21] >> Thank you. [34:25] All right to send them back out [34:26] onto the public hearing section [34:29] of the agenda starting a public [34:30] hearing No one on a petition by [34:33] the city Boston Public Works [34:33] Department for making a [34:34] specific appearance and in the [34:36] following public words in [34:37] Dorchester consisting of club [34:38] realignment road and sidewalk [34:41] reconstruction as well as new [34:41] best friend ramps street [34:42] lighting infrastructure [34:45] stagliano construction, [34:45] Greenstar water infrastructure [34:46] landscaping and raised [34:49] crosswalks Babson's Street at [34:49] Dolarhyde Street High Street [34:50] between Babson's Street and [34:53] Crossbeams Crossman Street se [34:53] Adell High Street. [34:56] This was new business on JUNE [34:57] 26 as shown on a set of plans [35:00] entitled City of Boston Public [35:00] Works Department Engineering [35:01] Division and Specific Repair [35:02] Plant and Neighborhood Slow [35:04] Streets Program Babson's Street [35:05] Crossman Street Dellal High [35:08] Street Mattapan for it's dated [35:09] JULY 2nd twenty twenty five the [35:11] proponents introduced [35:12] themselves their affiliations. [35:13] It was a very brief [35:16] introduction to the project and [35:17] let us know about any updates [35:20] since your new business here in [35:20] my chair and members of the [35:24] commission my is Housley the [35:24] capital project director with [35:25] the City of Parsons Public [35:27] Works Scheme Infrastructure [35:31] Design here say again for the [35:32] proposed reconstruction [35:33] of Baxendale High and [35:33] cross-industry. [35:36] This is a project came before [35:36] this commission and was [35:37] approved in twenty twenty three [35:40] and this year we are coming [35:43] back to work by some modest [35:44] modifications to raise to [35:45] previously proposed crosswalks [35:48] that were previously proposed [35:48] to be standard ramps. [35:52] One the street one across [35:55] across the street there was [35:55] ancillary work that needed to [35:56] take place in order to make [35:57] these changes. [35:59] We're here we're Deunan from [36:00] Kittleson Associates who can [36:00] walk through some of the plan [36:03] details and changes that were [36:04] made since last time they were [36:08] here more than a year. [36:10] I do not want to associates [36:15] sporting to this stuff the [36:16] proposed changes at the [36:19] intersection of Babson's Street [36:21] and High Street and Main Street [36:22] Delhaize Street include [36:26] realignment of the lines, the [36:30] widening of sidewalks, the [36:31] introduction of green [36:35] stormwater infrastructure and [36:38] now as a that the changes in [36:42] the plans to raise crosswalks [36:46] the there are no changes and [36:47] new business to the curb lines [36:49] or the race crosswalks [36:49] themselves. [36:50] Since then we had ordinated [36:54] where Boston Water and Sewer to [36:54] provide a more practical [36:57] connection with Green Line [37:02] along the street crisscross but [37:04] no one to connection directly [37:07] into the existing line instead [37:15] of a manhole within that street [37:15] . [37:16] There are no other changes to [37:19] the plan since new business but [37:19] I'm happy to answer any [37:21] additional questions you MAY [37:26] have on these plans. [37:29] I think you Lydia and Roger is [37:32] responsible for maintaining [37:33] your landscaping by our [37:34] attention areas being [37:36] created here. [37:37] Yes, thank you Chief. [37:38] The question we have [37:40] coordinated with our green [37:41] infrastructure and once the [37:44] requirement for the contractor [37:45] to maintain has expired per [37:48] usual contracting language the [37:49] office green structure will be [37:52] maintained under the contracts [37:52] . [37:52] Excellent. [37:53] Thank you very much, Bill. [37:54] The questions from [37:55] commissioners questions [38:02] comments yes he for members [38:07] of the public are all set on [38:07] this one. [38:08] >> All right. [38:11] Your motion to public hearing [38:11] number one I make a motion to [38:15] by the city Boston Public Works [38:16] Department for the making and [38:16] specific repairs in the street [38:19] that high street across the [38:19] street is represented by the [38:20] chair that can all in favor. [38:25] I I I at the podium stand so [38:30] thank you very much. [38:30] All right. [38:33] On to our final agenda item for [38:34] today public cheering number [38:37] two on a petition by Bunker [38:38] Hill Lanco llc in the Boston [38:39] Housing Authority for the [38:41] granting of nurse retention [38:42] license for the installation [38:45] of temporary temporary support [38:45] system within the following [38:49] roadways in Charlestown, Samuel [38:50] Morris Way private way open to [38:50] public travel and a [38:53] southwesterly sided address [38:53] number thirty between Decatur [38:54] Street and Cary Street after [38:58] Street Way on its northwesterly [38:58] side between Samuel Marseillais [39:01] and Mullenweg. [39:02] This was new business on JUNE [39:06] 26 a set of plans and on the [39:07] city of Boston Public Works [39:09] Department Engineering Division [39:09] Conceptual temporary excavation [39:10] support plan. [39:13] Thirty Samuel Morris Way [39:14] Decatur Street one Charlestown [39:17] Castle of Charlestown [39:18] appreciates dated APRIL 20 25 [39:21] when the proponents introduced [39:21] themselves their affiliations [39:22] give us a very brief [39:25] introduction to the project and [39:25] what is being proposed here and [39:28] let us know about any changes [39:29] since your new business here. [39:32] >> Good morning everyone. [39:33] Ignagni with significant [39:34] properties representing the [39:36] owner of this project we are [39:39] looking to install rc tiles [39:40] that are coming in the right [39:44] way when we are relocating our [39:47] operations or away away [39:47] expansion. [39:48] This is an image here that is [39:51] of the building to don't it's a [39:52] two hundred and sixty five unit [39:55] multifamily building that is [39:56] nine stories and this request [39:59] again is for the retention [40:00] required to get the foundation [40:03] in Decatur Street side of the [40:06] building. [40:07] I'm just going to describe [40:11] these for restoration design we [40:15] are providing proposing some [40:21] something excuse me along said [40:22] Morris playing here as well [40:26] down the campus street and [40:27] Morgan Street Center is very [40:30] much the street come up with at [40:31] some point in the future the [40:33] Cantor Street in public right [40:34] now I'm sorry that shooting [40:37] will be cut down a great [40:38] although the style upgrade upon [40:41] completion of the construction [40:45] will continue on this area here [40:46] cut down to six feet below the [40:46] sidewalk. [40:49] Great completion this area here [40:52] no assembly is required because [40:53] we are able to cut back the [40:55] stops to allow the installation [40:56] of the foundation without any [40:58] Selby department. [41:03] Any questions commissioners [41:07] questions I just made your [41:08] share your plans both regarding [41:09] his construction management [41:17] group, your mom and dad raising [41:18] questions this morning that [41:20] will address on the milers on [41:27] MR. Isef for members of the [41:35] public also right through a [41:36] pretty public hearing two to [41:37] make a motion to approve the [41:39] driving station by Bunker Hill [41:40] and Co llc in the Boston [41:40] Housing Authority for the [41:43] running of the retention [41:43] license and Samuel Morse Way in [41:44] Decatur Street is being [41:49] directed by the Jack Packard [41:52] all in favor I I ay any opposer [41:56] same so moved. [41:57] Thank you very much. [41:57] Thank you guys. [42:00] All right we've reached the end [42:01] of our agenda to Ijaw in motion [42:04] to German I'll make sure [42:08] generator back in on favor I I [42:11] read thank you all we'll see