[1:08] blpz [1:09] >> priscilla rojas: I am the [1:11] chair of the bpda board. [1:13] Thank you for joining the [1:17] AUGUST 13, 2026, board meeting. [1:20] At this time the boston [1:21] planning & development agency [1:22] is hosting in a hybrid setting [1:25] for the health and safety of [1:26] boston residents. [1:28] Our board meetings are [1:31] conducted virtually via zoom [1:33] and boston city tv. [1:37] For more information visit [1:37] online. [1:39] I notify the public this [1:40] meeting is being recorded. [1:42] Please be award that the [1:44] audio/visual recording is being [1:46] made by the office -- no. [1:48] Made and broadcast by boston [1:49] city tv which is part of the [1:51] city of boston office of cable [1:53] communications t xfinity [1:55] channel 6 and rcn channel 13. [1:58] And verizon fios. [2:01] It is also live streamed at [2:02] boston.Gov. [2:03] If there is anyone in the [2:05] audience recording the meeting [2:05] today, please identify [2:06] yourself. [2:07] Hearing and seeing none, we'll [2:12] start with the roll call. [2:22] [Roll call] [2:24] Item 1, approval of the minutes [2:28] of JULY 16, 2026, board [2:28] meeting. [2:32] All those in favor? [2:33] [Chorus of ayes] [2:34] Opposed? [2:36] The ayes have it. [2:37] Item 2. [2:38] Request authorization to enter [2:41] into a license agreement with [2:45] 12 channel street in the marine [2:45] park. [2:46] >> thank you. [2:49] It's been quite a long time [2:50] since our paths have crossed. [2:52] But I was happy to hear you [2:54] attend our board. [2:55] Thank you. [2:58] Mass robotics inc. Has been a [3:00] tenant at 12 channel straet [3:01] since 2016. [3:02] Theyeet [3:02] since 2016. [3:04] They provide work space for [3:05] automation start-up companies. [3:06] Very similar business model to [3:08] that of we work where they [3:10] charge a fee for the use of the [3:12] premises by start-up companies, [3:15] provide work space, meeting [3:16] rooms, et cetera. [3:18] The lease has been amended five [3:20] times since 2016. [3:22] Always to accommodate the [3:24] expansion or contraction of the [3:24] space. [3:28] Effective DECEMBER 2024, mass [3:30] robotics leased 51,000 square [3:32] feet in four separate suites, [3:34] two comprising the entire [3:35] second floor of the building [3:39] and two noncontiguous smaller [3:41] suites on the fifth floor of 12 [3:44] channel street. [3:45] Simultaneously, 2024, 12 [3:47] channel street was on the verge [3:52] of significant vacancies. [3:53] East manufacturing moved from [3:55] the entire third floor and the [3:57] imminent and pending vacation [3:59] of global protection [4:00] corporation vacating the fourth [4:01] floor and most of the seventh [4:03] floor. [4:06] In JANUARY 2025, the board [4:08] approved staff's recommendation [4:10] to remove the fifth floor [4:12] suites from the mass robotics [4:16] space and add the entire third [4:18] floor to the premises. [4:20] They currently lease 69,000 [4:22] square feet comprising of the [4:23] entire second floor, entire [4:26] third floor, and a small [4:28] portion f the first floor. [4:30] And they are continuing a ten [4:39] nen si at one of the smaller [4:41] areas of the 502 suite on the [4:44] fifth floor. [4:47] Mass robotics had previously [4:49] had interest in the now-vacant [4:52] fourth floor of the 12 channel [4:53] street to secure their [4:54] long-term growth planning. [4:56] Staff was very motivated to [4:58] negotiate with an existing [4:59] tenant rather than seeking a [5:01] new tenant for the fourth [5:01] floor. [5:04] Mass robotics in this case, [5:05] they benefit from operating [5:06] efficiencies with three [5:07] contiguous floors. [5:09] And the planning department we [5:15] can now go to market with the [5:16] smaller floors. [5:17] The economics of the [5:19] transaction are in the memo and [5:21] the term sheet, but I'll [5:22] summarize for the public [5:23] record. [5:26] Staff believes that the current [5:28] market for the industrial space [5:33] in the sea port is $18 to $23 [5:35] per square foot. [5:38] Currently paying $19.10 for the [5:40] existing premise which is [5:42] scheduled to go unto $21.50 [5:44] next year. [5:48] The current lease expires in [5:48] 2022. [5:51] We are proposing the following. [5:53] Mass obotics will take on the [5:55] fourth floor to add it to the [5:56] lease premises. [5:58] No additional rent will be paid [6:00] by the fourth floor during the [6:02] first year of the amended [6:02] lease. [6:04] In exchange, the expiration [6:07] date will be extended from 2032 [6:09] to 2036. [6:12] So we have four more years. [6:13] The rent will increase back to [6:17] the $21.55 in SEPTEMBER of [6:17] 2027. [6:19] By virtue of the free rent on [6:23] the fourth floor, they're all [6:25] in per square foot, a little [6:27] over $12 but that's about a [6:27] year. [6:28] It's important to point out [6:29] that the planning department is [6:31] not contributing to the cost of [6:37] the relocation. [6:39] And we are not paying a real [6:41] estate commission which would [6:42] likely have been between [6:45] $250,000 and $500,000 were an [6:45] outside broker involved in any [6:52] lease. [6:53] There's no cash flow reduction, [6:55] so it's easy to budget. [6:56] Guaranteed rent over the [7:03] remaining current lease will go [7:04] up. [7:05] Factoring in the next ten years [7:08] for the new lease, it'll still [7:12] go up between 7% and 15%. [7:14] And that's forecast depending [7:15] on what happened to the fifth [7:16] floor if we didn't lease to [7:17] mass robotics. [7:19] If we did a five-year lease, it [7:21] would go up about 7%. [7:22] Ten-year lease would go up by [7:26] 15%. [7:29] Sorry for rambling, but I am [7:31] requesting approval. [7:32] >> priscilla rojas: thank you [7:32] very much. [7:33] Any uestions or comments from [7:37] the board? [7:38] Laering and seeing none, motion [7:39] is in order. [7:40] >> so moved. [7:41] >>. [7:43] >> priscilla rojas: all those [7:47] in favor? [7:47] [Chorus of ayes] [7:48] No? [7:50] The ayes have it. [7:52] Next is the upgrades at 12 [7:53] channel street in the marine [7:53] park. [7:54] Tyler? [7:55] >> thank you, MADAM Chair, [8:06] members of the board. [8:08] 12 channel street is a [8:09] nine-story building constructed [8:11] around 1941 for the U.S. Navy. [8:13] Today the building supports a [8:15] diverse mix of commercial, [8:17] nonprofit, and restaurant [8:21] tenants totaling approximately [8:23] 250,000 square feet. [8:24] The infrastructure has exceeded [8:26] its useful life and no longer [8:27] meets the operational needs of [8:28] the building. [8:29] Portions of the electrical [8:31] equipment that be recalled [8:32] creating life safety concerns. [8:35] The current electrical dis [8:38] distribution system is also [8:39] working beyond capacity [8:40] resulting in outages that [8:42] affect multiple tenants. [8:44] Upgrading the system is [8:45] essential to improving building [8:46] liability and safety. [8:49] The project will help meet [8:51] future electrical demands, [8:52] support future electrify [8:55] ication [8:55] compliance [8:56] compliance. [8:58] And relocate the electrical [9:01] room to comply with flood [9:01] requirements. [9:02] It will provide design, [9:03] development, and construction [9:06] documents suitable for public [9:07] bidding, construction [9:09] administration services during [9:09] future construction phase. [9:11] Throughout the design process, [9:14] the consultant will work [9:16] closely with bpda for the most [9:17] cost efficient solution. [9:19] It will be selected with mass [9:21] general law chapter 7c and all [9:23] applicable city of boston [9:28] procurement requirements. [9:31] it is not to exceed $275,000. [9:32] Therefore staff recommends the [9:33] clerk be authorized to [9:35] advertise an issue that [9:37] requests for qualifications for [9:39] qualified engineering [9:40] consultant for the service [9:40] upgrade project. [9:41] Thank you. [9:42] Happy to answer any questions. [9:43] >> priscilla rojas: thank you. [9:44] Any questions or comments from [9:45] the board? [9:45] All right. [9:47] Hearing and seeing none, motion [9:47] in order. [9:48] >> so moved. [9:49] >> second. [9:50] >> priscilla rojas: all those [9:51] in favor? [9:52] Opposed? [9:52] The yes have it. [9:56] Thanks. [9:58] Request authorization to issue [9:59] a request for qualification to [10:03] hire a licensed design [10:04] consultant to provide zienl [10:04] services resulting in [10:06] construction documents for [10:07] window replacements on the [10:09] ninth floor of 12 channel [10:13] street and the raymond elfman [10:13] marine park. [10:15] >> thank you again. [10:16] We are asking for [10:18] qualifications to procure an [10:18] architectural and engineering [10:20] design services for the 12 [10:22] channel street window [10:23] replacement project. [10:24] It is the first time this [10:27] matter has been before you. [10:29] 12 channel treet is originally [10:31] constructed by the U.S. [10:33] Military in 1941 as a naval [10:33] storehouse. [10:36] Today it serves a wide range of [10:38] technology and nonprofit [10:39] tenants including boston [10:40] transportation department, mass [10:42] robotics. [10:46] Many of the buildings's [10:46] original service has reached [10:49] the end of their useful life. [10:52] These contribute to significant [10:53] energy loss resulting in [10:55] long-term maintenance costs. [10:56] Bpda's efforts to improve [10:58] building efficiency and helps [10:59] move the acility toward [11:01] compliance with boston's [11:02] requirements. [11:04] The building currently has [11:07] approximately 115 original [11:08] windows and several still [11:10] requires replacement. [11:12] Because replacing every window [11:14] is to cost approximately $9.5 [11:15] million, the work will be [11:17] completed in phases. [11:18] The project focuses on the [11:19] design for replacing the [11:21] ninthen floor windows while [11:22] maintaining the window [11:25] standards and apaerns. [11:27] The selected consultant will be [11:30] looking at the windows, [11:32] identify deficiencies and [11:34] improve energy efficiency and [11:36] restore water tight conditions. [11:38] Prepare documents for public [11:40] bidding, provide bitd [11:45] d by- [11:45] bidding. [11:47] To preserve them until future [11:48] replacement phases. [11:51] The consultant will be selected [11:52] in accordance with [11:53] massachusetts general law and [11:54] all applicable city of boston [11:56] procurement requirements. [11:57] Funding for the design phase [11:59] included in the capital [12:00] construction budget, therefore [12:02] staff recommends for the clerk [12:04] to advertise the request for [12:05] qualifications for qualified [12:07] design for 12 channel street [12:08] window replacement. [12:09] Thank you. [12:10] if you have ny questions, I'll [12:11] answer them at this time. [12:12] >> priscilla rojas: any [12:13] questions or comments from the [12:13] board? [12:15] Hearing and seeing none, a [12:15] motion is in order. [12:17] >> so moved. [12:17] >> second. [12:19] >> priscilla rojas: all those [12:20] in favor? [12:20] Opposed? [12:23] The ayes have it. [12:24] Item 5, request authorization [12:26] for invitation for bids of the [12:27] installation of physical [12:28] security infrastructure for [12:31] parcel c1 and c2 located in the [12:35] raymond elfman marine park. [12:37] >> we are requesting to [12:38] advertise and issue nvitation [12:40] for bids for the installation [12:41] of physical security [12:44] infrastructure at the c1 and c2 [12:45] parking lots within the marine [12:46] park. [12:51] Raymond elfman marine park is a [12:53] 190 acre industrial park. [12:55] Over the years the park has [12:57] evolved into a diverse hub f [12:59] manufacturing, research, [13:00] technology, pharmaceutical, and [13:02] mare time industries. [13:04] The project focuses on the c1 [13:06] and c2 parking lots located off [13:07] of terminal street. [13:08] Design services, construction [13:10] documents, and estimates for [13:12] this project were completed by [13:14] cha consulting under a design [13:16] contract previously authorized [13:19] by the dic board in OCTOBER of [13:19] 2023. [13:21] The project will improve the [13:22] monitoring capabilities of the [13:24] c1 and c2 parking lots. [13:28] These improvements will provide [13:31] enhanced surveillance, improved [13:32] security, better protect bpda [13:34] assets, tenants, employees, and [13:35] visitors throughout this [13:37] section of the marine park. [13:39] The construction project [13:40] includes installation of new [13:42] surveillance cameras and camera [13:45] stations of point to point [13:45] telecommunications equipment, [13:47] new perimeter and entrance [13:51] security surveillances, [13:55] electrical work to install new [13:58] systems, installation, asphalt [13:59] cutting, and pavement [13:59] restoration. [14:01] The project will be publicly [14:04] advertised and invitation for [14:06] bid will be in accordance with [14:08] massachusetts general law [14:09] chapter 149. [14:11] The contract will be awarded to [14:12] the responsible bidder. [14:14] Following the bid process, [14:16] staff will return to the board [14:18] to secure the construction [14:19] contract. [14:23] The estimated cost for this [14:27] construction is $444,222. [14:28] Funding for this project is [14:30] included in bpda's fiscal year [14:31] '27 apital construction [14:32] budget. [14:34] Therefore, staff recommends [14:36] authorization for the clerk to [14:37] advertise and issue invitation [14:39] for the installation of the [14:41] infrastructure at c1 and c2 [14:42] parking lots within the ray mon [14:49] el -- raymond elfman marine [14:49] park. [14:49] >> priscilla rojas: any [14:51] questions from the board? [14:53] Hearing and seeing none, motion [14:53] in order. [14:55] >> so moved. [14:56] >> second. [14:58] >> priscilla rojas: all [15:01] approved? [15:01] Noes? [15:03] It is adopted. [15:07] Item 6, teresa. [15:09] >> thank you, MADAM Chair. [15:11] we have several items on the [15:12] agenda with the exact details [15:14] included in the board memos. [15:16] We have one contract in the [15:18] director's office. [15:19] Jacqueline martinez. [15:22] We have one in the office of [15:24] general council and we have one [15:28] resignation in the urban design [15:29] division who serves as the [15:33] deputy director of designing. [15:34] >> priscilla rojas: thank you. [15:34] Any questions or comments from [15:35] the board? [15:36] All right. [15:37] Hearing and seeing none, a [15:38] motion is in order. [15:39] >> so moved. [15:40] >> second. [15:41] >> priscilla rojas: all those [15:42] in favor? [15:42] Opposed? [15:44] The ayes have it. [15:45] Motioning passes. [15:46] Just want to say welcome to the [15:48] intern and to jacqueline who [15:52] will be helping out. [15:53] And as well as thank you so [15:56] much, christina, for all of [15:57] your contributions to the [16:01] agency over the years. [16:02] You've been a critical part of [16:04] helping us shape the city. [16:05] So hope you're proud. [16:06] I wish you best of look in [16:08] anything that you do in the [16:08] future. [16:09] And know that you have friends [16:11] here. [16:13] With that I need a motion to [16:17] adjourn this meeting. [16:19] >> I second that. [16:21] >> priscilla rojas: you can't [16:24] second and make a motion. [16:25] [Laughter] [16:26] >> so moved. [16:31] [Laughter] [16:32] >> priscilla rojas: all right. [16:34] So all those in favor. [16:34] Opposed? [16:35] the ayes have it. [16:38] Meeting adjourned. [16:39] Starting with the next portion [16:41] of our meeting, thank you for [16:45] joining the AUGUST 13th, 2026 [16:46] boston redevelopment meeting. [16:47] The planning and development [16:49] agency is hosting public [16:50] meetings in a hybrid setting [16:52] for the health, safety, [16:56] andability -- accessibility of [17:01] boston residents. [17:01] . [17:03] For more information and [17:05] updates, visit bostonplans.Org. [17:06] The open public meeting law [17:08] requires hat I notify the [17:09] public this meeting is being [17:10] recorded. [17:11] Please be aware that an audio [17:13] and visual recording is being [17:15] made and broadcast by boston [17:18] city tv which is part of the [17:20] boston city office of cable [17:23] communications. [17:24] It's also being live streamed [17:26] at boston.Gov/cable. [17:27] If here's anyone in the [17:29] audience who's recording this [17:30] meeting, I ask you please [17:32] identify yourself now. [17:33] Seeing none. [17:34] Also please note that [17:36] demonstrations of approval r [17:37] disapproval from members of the [17:38] public are not permitted during [17:38] the meeting. [17:39] Thank you. [17:41] We'll start with the roll call. [17:49] [Roll call] [17:50] Item 1. [17:51] Request authorization for [17:53] approval of the JULY 16, 2026, [17:54] board meeting. [17:56] >> so moved. [17:57] >> second. [17:57] >> priscilla rojas: all those [17:58] in favor? [17:59] Opposed? [17:59] Ayes have it. [18:01] >> excuse me, MADAM Chair. [18:04] I'll be recusing myself from [18:05] item 2. [18:06] >> priscilla rojas: thank you, [18:11] MR. O'malley. [18:11] Item 2. [18:13] Request authorization to enter [18:14] into a license agreement with [18:15] the new england aquarium [18:17] corporation for the use of a [18:19] portion of bda-owned property [18:21] located at east india row in [18:26] the downtown waterfront area [18:28] until MARCH 13st, 2027. [18:30] Samantha? [18:32] >> good afternoon, MADAM Chair [18:33] and members of the board. [18:34] I'm here to request approval to [18:36] enter a license agreement with [18:37] the new england aquarium [18:39] corporation for use of [18:40] bpda-owned property located at [18:43] east india row for a food [18:44] vending kiosk. [18:45] The downtown water front area [18:47] is one of the most popular [18:48] tourist destinations in the [18:50] city of boston making it a [18:51] valuable location for food [18:51] vending. [18:54] The location for the downtown [18:56] waterfront food vendor program [18:58] is on the boston planning and [19:01] development owned land [19:03] strategically placed adjacent [19:05] to the simons theater. [19:08] It is an opportunity to support [19:10] tourism in the city and creates [19:11] opportunity for local business [19:13] vendors to sell food and [19:14] beverages to the public. [19:17] The new england aquarium has [19:18] rented a food kiosk to [19:19] thousands of visitors each [19:21] month for the past ten years. [19:23] This kiosk is a great [19:26] complement to those from vra on [19:29] the long wharf. [19:30] To secure all necessary permits [19:31] and the proposed license will [19:33] allow for an eight-month [19:34] license which will commence on [19:36] AUGUST 17, 2026, and expire on [19:37] MARCH 31st, 2027. [19:41] The licensed fee shall be [19:42] $5,880 per month payable in [19:44] advance on the first day of [19:45] each month commencing on ugust [19:47] 17, 2026. [19:50] The license fee is a 5% [19:50] increase from the previous [19:51] license rate. [19:52] Thank you. [19:53] Happy to answer any questions. [19:54] >> priscilla rojas: thank you. [19:55] Any questions or comments from [19:56] the board? [19:57] All right. [19:59] Hearing and seeing none, motion [20:00] is in order. [20:00] >> so moved. [20:02] >> second. [20:03] >> priscilla rojas: all those [20:06] in favor? [20:07] Opposed? [20:08] The ayes have it. [20:10] Motion passes. [20:12] Thanks, samantha. [20:14] Welcome back. [20:16] Item 3, request authorization [20:17] to amend the lease with urban [20:19] college of boston removing [20:21] suite 100 located at 2 boylston [20:23] street from the leased premises [20:25] and restructuring rent payments [20:27] through 2032. [20:28] >> thank you, MADAM Chair. [20:29] Good afternoon. [20:32] The board previously voted in [20:34] MARCH of 2026 to amend urban [20:36] college of boston's lease by [20:37] restructuring the rent to [20:38] reflect current market [20:40] conditions and extend the lease [20:41] term through 2032. [20:43] I'm here today to request [20:44] authorization to further amend [20:47] that lease to remove the first [20:50] floor space, suite 100, and [20:53] adjust accordingly. [20:55] they are a long standing tenant [20:57] providing higher education and [20:59] advancement opportunities to [20:59] traditionally underserved [21:03] communities. [21:06] Ucb urban college leases [21:08] approximately 15,092 square [21:11] feet on the first and second [21:12] floors of the building. [21:14] During our first lease [21:16] negotiations, ucb expressed [21:17] uncertainty about its long-term [21:18] need for the first floor [21:20] classroom space. [21:22] Staff agreed to revisit the [21:23] space requirement after [21:25] securing the longer-term [21:28] commitment. [21:29] Ucb has now determined it no [21:30] longer needs the first-floor [21:32] space. [21:33] Staff is therefore recommending [21:36] removing 3,567 square feet on [21:39] the first floor reducing ucb's [21:41] lease premises to 11,527 square [21:43] feet on the second floor. [21:45] The rental rate will remain the [21:48] same which is $21 per square [21:51] foot with annual increases [21:54] until 2032. [21:56] Effective AUGUST 2026, rent [21:57] will decrease from [22:04] approximately $316,932 to [22:05] $242,025. [22:07] While this represent [22:08] approximately a 24% reduction [22:12] in annual rent, it provides [22:14] bpda with guaranteed rental [22:15] income through 2032. [22:18] That is predicted to be 84% [22:19] greater than the forecasted [22:22] rent if ucb had vacated at the [22:24] original lease expiration in [22:25] 2027. [22:27] The amendment also returns [22:29] space to allow us to market it [22:31] to another tenant or user. [22:32] We regularly receive inquiries [22:35] through the planning [22:37] department's portal. [22:39] today's request is to authorize [22:41] the amendment to remove suite [22:43] 100 from ucb's lease and [22:45] restructure the rent base on [22:46] remaining square feet. [22:48] Thank you and I am here to [22:49] answer any questions you MAY [22:49] have. [22:50] >> priscilla rojas: thanks, [22:50] liz. [22:52] Any questions or comments from [22:52] the board? [22:53] Hearing and seeing none, motion [22:54] is in order. [22:55] >> so moved. [22:57] >> second. [22:58] >> priscilla rojas: all those [23:00] in favor? [23:00] Opposed? [23:01] The ayes have it. [23:03] You guys have to work that out [23:05] down there. [23:07] Item 4. [23:08] Request authorization o assign [23:12] the lease held by second mass [23:14] ave realty trust for building [23:15] 120 in the historic monument [23:17] area of the charlestown navy [23:19] yard to the uss constitution [23:20] museum incorporated. [23:22] >> thank you again. [23:23] In MAY of 2026, the board [23:25] previously voted to approve the [23:28] transfer of building 120 lease [23:30] from clifford long realty trust [23:33] to the uss constitution museum. [23:34] I am here today to request that [23:35] the board expand that [23:38] authorization to include two [23:40] intermediate transfers [23:43] necessary to complete. [23:46] A building is approximately [23:47] 14,875 square feet office [23:49] building located within the [23:50] charlestown navy yard. [23:53] MR. Long intends to donate the [23:55] remaining leasehold to the uss [23:56] constitution museum to [23:57] structure the donation for tax [23:58] purposes. [23:59] the interest will first [24:00] transfer to two long family [24:04] trusts. [24:06] Then to clifford and kim long [24:08] and then finally to the uss [24:09] constitution museum. [24:11] These intermediate transfers [24:13] were always part of the [24:14] intended transaction. [24:18] However, museum counsel has [24:20] requested a certificate of vote [24:21] that specifically identifies [24:22] and authorizes each transfer [24:23] for recording purposes. [24:24] The ultimate recipient and [24:25] purpose of the transaction has [24:26] not changed. [24:28] The existing lease terms will [24:34] remain inning -- in tact with [24:37] no anticipated negative [24:38] financial impact to bpda. [24:40] Staff recommends approval of [24:41] the intermediate transfers and [24:42] authorization for the director [24:44] to execute all necessary [24:46] documents to complete the [24:46] assignment. [24:47] Thank you and I'm here to [24:48] answer any questions. [24:49] >> priscilla rojas: any [24:49] questions or comments from the [24:51] board? [24:52] Hearing and seeing none, a [24:53] motion is in order. [24:54] >> so moved. [24:55] >> second. [24:56] >> priscilla rojas: all those [24:57] in favor? [24:57] Opposed? [24:58] Ayes have it. [25:00] And I do want to give a shout [25:03] out to the real estate [25:04] division. [25:06] I continue to be impressed with [25:08] the work of this department in [25:11] your creative solutions to [25:13] supporting our tenants and [25:16] being so fiscally responsible [25:19] but understanding f our [25:20] tenants and the needs of our [25:21] city. [25:23] I just wanted to say that. [25:27] But we can move onto item 5. [25:29] Request authorization to extend [25:31] the tentative designation [25:33] status of and nter into lease [25:35] negotiations with powerhouse [25:37] cny llc for the long-term lease [25:39] and redevelopment of building [25:41] 108 property in the charlestown [25:44] navy yard on a portion of ny-1 [25:46] in the charlestown urban [25:48] renewal area project number [25:50] mass r-55 for a period of six [25:53] months until FEBRUARY 28, 2027. [25:54] >> thank you, MADAM Chair and [25:55] members of the board. [25:57] I am here to request approval [26:01] to extend the tentive [26:05] designation of powerhouse cny [26:07] llc in the charlestown navy [26:07] yard. [26:09] Building 108 was a vacant [26:16] building of approximately 2,000 [26:17] square feet. [26:20] Powerhouse cny was tentatively [26:23] designated back in FEBRUARY [26:24] 2021. [26:26] This project team intends to [26:28] redevelop the site into a [26:29] 97,000 square eet building [26:34] with approximately 84,000 [26:36] square feet of lab space with [26:38] additional cafe space and 39 [26:39] blow-grade parks space. [26:41] The abatement and demolition of [26:43] the former building was [26:45] substantially completed [26:46] actually back in spring of 2023 [26:49] and in fall of 2025, the [26:52] project received its bpda board [26:53] approval for article 80 large [26:56] project review. [26:57] Admittedly, the current market [27:00] environment still poses [27:03] challenges for the life [27:04] sciences and developments. [27:05] But the development team is [27:06] continuing to pursue [27:08] perspective tenants and [27:09] financing for the project. [27:10] Since their last extension in [27:11] FEBRUARY, the project team [27:13] continues to make progress on [27:15] their coordination for the [27:17] transformer locations with the [27:18] budding leaseholders. [27:20] In addition, the team has [27:22] actively collaborated all the [27:24] necessary construction [27:28] licensing on the abutting nps [27:29] office area in building 107. [27:31] At this time, I would like to [27:33] recommend extending the [27:34] destinations for us at [27:37] powerhouse for additional six [27:40] months to continue this work on [27:40] the site. [27:41] Thank you and I'm happy to [27:44] answer any questions. [27:44] >> priscilla rojas: any [27:45] questions or comments from the [27:47] board? [27:47] All right. [27:49] Hearing and seeing none, a [27:49] motion is in order. [27:51] >> so moved. [27:51] >> second. [27:52] >> priscilla rojas: all those [27:53] in favor? [27:54] Opposed? [27:55] The ayes have it. [27:56] Item 6, request authorization [27:58] to extend the final designation [28:00] status of nubian ascend [28:03] partners llc as redeveloper of [28:04] the blair lot in the nubian [28:06] square of roxbury for a period [28:07] of six months until FEBRUARY [28:08] 28, 2027. [28:09] >> thank you, again. [28:12] The blair lot is a bpda-owned [28:14] site consisting of [28:17] approximately 80,879 square [28:21] feet of unutilized land in [28:22] roxbury. [28:23] This was subject to a community [28:25] planning process through plan [28:27] nubian and through subsequent [28:29] meetings. [28:34] following the dsposition, our [28:37] fee released back in NOVEMBER [28:37] 2019. [28:39] Nubian was tentatively [28:41] designated for redevelopment at [28:43] the site at the DECEMBER 2020 [28:45] board meeting. [28:47] Approximately 189,000 square [28:49] feet of mixed use development [28:51] including affordable housing, [28:52] parking garage, lab training [28:54] and office building, and a [28:56] cultural hall will be involved. [28:58] It was awarded final [28:59] destination status in MARCH [29:00] 2023. [29:03] As you know again since then, [29:04] the market conditions in office [29:06] sectors have changed [29:06] dramatically. [29:07] Rather than stick to the status [29:10] quo, the project team has [29:11] explored an alternative [29:12] approach to the development to [29:14] maintain the project's [29:15] feasibility. [29:17] Since their last etension, the [29:18] team as continued to refine [29:20] the revised approach to the [29:21] master plan and phasing to [29:23] reflect the market and funding [29:25] conditions impacting many of [29:25] the project's program [29:30] components. [29:32] And this will be documented in [29:34] a subsequent notice of change. [29:35] During the final destination [29:36] extension, the proponent [29:38] intends to file an npc [29:39] reflecting these changes and [29:40] advance a site remediation plan [29:44] to utilize the project's grant [29:45] in addition to seeking [29:48] additional sources of funding. [29:50] With that being said, I request [29:52] that the board authorize the [29:54] final destination extension for [29:57] a period of six months to [29:59] youtubian ascend partners. [29:59] Thank you. [30:02] happy to answer any questions. [30:03] >> priscilla rojas: any [30:04] questions or comments from the [30:04] board? [30:05] >> yes. [30:06] Obviously I have no issues [30:10] extending the designation. [30:11] Know this area well, it's in [30:13] the heart of nubian square. [30:15] Things have changed due to [30:15] external factors. [30:16] Can you talk about how the [30:18] financing is coming along ith [30:19] this new iteration? [30:23] >> yeah, so there s a -- so [30:25] for the first phase that is [30:27] being contemplated which is [30:33] building a, the lab training [30:35] building, there is a $50 [30:35] million -- [30:38] >> did you say 50 or 15? [30:39] >> 5-0. [30:42] So that is the funding in [30:43] addition to mass works which [30:47] will be funding the public [30:48] infrastructure portion and some [30:50] of the site remediation work [30:52] from the contamination that's [30:54] present on site. [30:57] And there is additional funding [31:00] that the team is pursuing at [31:01] this time. [31:02] None of which are concrete [31:04] enough to share with you at the [31:04] moment. [31:06] But we hope to have details of [31:07] that in subsequent board [31:11] meetings as well. [31:12] >> matt o'malley: great. [31:13] Thank you so much. [31:14] >> priscilla rojas: any other [31:15] questions or comments? [31:17] Hearing and sees none, motion [31:17] in order. [31:19] >> so moved? [31:20] >> second. [31:21] >> priscilla rojas: all in [31:22] favor? [31:22] Opposed? [31:23] Ayes have it. [31:25] item 7 request authorization to [31:26] issue request for proposals to [31:28] hire a licensed design [31:28] consultant to provide [31:30] engineering design services [31:31] resulting in construction [31:33] documents to perform the pier 4 [31:34] utility infrastructure repairs [31:37] in the charlestown navy yard. [31:39] >> thank you, MADAM Chair, [31:41] members of the board again. [31:43] We are requesting to issue [31:45] request for proposal to procure [31:46] engineering design services for [31:47] the pier 4 utility [31:48] infrastructure repair in the [31:49] charlestown navy yard. [31:50] This is the irst time the [31:52] matter has been before you. [31:54] Pier 4 is owned and operated by [32:00] the bpda and currently licensed [32:02] for use by the courageous [32:03] sailing center. [32:05] The pier was originally [32:06] constructed in the 1950s and [32:08] has undergone several recent [32:09] capital improvements to extend [32:10] its useful life. [32:11] Additional work included [32:19] stabilization of the dis [32:20] coal berg [32:21] under the pier and are expected [32:24] to begin later in the year. [32:25] During these recent products, [32:28] the efficiencies in the pier's [32:31] underground utility system were [32:33] found making this he next [32:36] logical phase of improvements. [32:37] It will design -- I'm sorry. [32:38] Start that again. [32:40] The project will evaluate and [32:43] design repair -- and desire [32:45] repairs for the aging [32:47] underground utility structure. [32:49] Addressing these systems now [32:53] will improvement reliability, [32:54] support future maintenance [32:55] efforts and help preserve [32:57] long-term functionality. [32:59] The selected consultant will [33:02] assess the existing [33:03] infrastructure, prepare, [33:05] engineer, and design documents, [33:06] obtain necessary permits, and [33:08] assist in future bidding [33:08] process. [33:11] They will also provide [33:12] construction administration [33:13] services. [33:14] The design will address storm [33:17] water systems, domestic water, [33:19] sanitary sewer, electrical [33:22] infrastructure, removal of [33:25] abandoned utility piping. [33:28] The consultant will be selected [33:30] for a request for proposal in [33:32] accordance with the mass [33:35] general chapter 30 section 39m. [33:37] Funding for the design phase is [33:39] included in bpda's fiscal '27 [33:40] budget in the amount of [33:42] $150,000. [33:43] Therefore, staff recommends [33:45] that the secretary be [33:46] authorized to advertise and [33:48] wish you a request for proposal [33:49] for qualifying engineering [33:54] consultant to design the pier 4 [33:54] utility infrastructure project. [33:55] Thank you. [33:56] Happy to answer ny questions. [33:57] >> priscilla rojas: any [33:58] questions or comments from the [33:59] board? [34:01] I do have one. [34:04] So I know you said this is [34:07] included in the fy-27 capital [34:13] construction budget. [34:14] But these were unforeseen [34:14] expenses. [34:18] So are we having to kind of put [34:19] something else off to do this? [34:21] Just trying to understand. [34:23] >> I'll have rebecca come up. [34:29] >> so you MAY remember it was [34:31] about a year or two ago at pier [34:33] 4, they were unforeseen at that [34:33] time. [34:34] But since that time and in [34:35] working with folks that have [34:37] been using that licensed [34:39] premises and others in our own [34:40] investigations, we've uncovered [34:41] the need for the investments. [34:44] So lots of forewarning and [34:45] we've had that as part of the [34:46] budget. [34:48] So it was in the context of our [34:51] typical budget process. [34:51] >> priscilla rojas: all right. [34:52] Any other questions or [34:53] comments? [34:54] A motion is in order. [34:55] >> so moved. [34:56] >> second. [34:57] >> priscilla rojas: all those [34:58] in favor? [34:58] Opposed? [34:59] Ayes have it. [35:00] Thank you. [35:02] Item 8 request authorization to [35:04] approve design changes to the [35:06] south end urban renewal area, [35:09] project number mass r-56 [35:13] parcels f 1-a, 1-b, 1-c, 1-d [35:17] located at 474, 482, and 494 [35:18] tremont street. [35:19] Subject to continuing design [35:20] review. [35:21] And to execute and deliver a [35:23] release of a portion of [35:24] reservation of public travel [35:26] easement rights, and any and [35:28] all other instruments, [35:29] agreements, or documents deemed [35:31] necessary in connection with [35:32] the construction of canopies to [35:35] the ear entrances of castle [35:37] square residences, as part of [35:38] the rehabilitation of the [35:40] castle square apartments. [35:40] Dennis? [35:43] >> thank you, MADAM Chair. [35:44] Castle square apartments are [35:46] loekded as you said at [35:49] cated as you said at 474 [35:50] tremont street in the south [35:51] end. [35:55] There it is 1 [35:59] 00% an elderly and [36:00] disabled community. [36:03] The tenants are managed and the [36:04] boston redevelopment authority [36:06] still owns the playground in [36:08] the courtyard. [36:11] We would like to install three [36:15] canopies 10 to 12 feet to [36:18] better protect people from the [36:20] elements. [36:20] Spesk [36:21] specifics regarding the [36:22] location of the canopies are [36:24] within the board memo. [36:28] It's ot my wheel house. [36:29] But colleagues in urban design [36:32] have given it a lot of review. [36:33] I defer to them. [36:36] The existing boston [36:36] redevelopment authority deed [36:40] that you mentioned places a [36:43] restriction wherein no [36:44] structure MAY be added at a [36:46] height below 32 feet. [36:48] The bre staff have reviewed and [36:51] ae proved the design of the [36:53] canopy. [36:57] S -- continued review by the ra [37:00] staff and the subject of public [37:03] travel easement be allowed the [37:06] canopies at the 10 to 12 foot [37:07] height rather than the 32. [37:07] Thank you. [37:09] >> priscilla rojas: great. [37:10] Any questions or comments from [37:17] the board? [37:18] All right. [37:20] I do sl -- trying to think. [37:21] What was the 32 height trying [37:23] to ind of prevent? [37:24] >> I don't really know. [37:26] It was done so long ago, I [37:26] think I was in high school when [37:29] they did that. [37:34] [Laughter] [37:35] >> priscilla rojas: I think [37:37] that answers my question. [37:38] Questions or comments from the [37:39] board? [37:40] Hearing and seeing none, a [37:41] motion is in order. [37:43] >> so moved. [37:43] >> second. [37:44] >> priscilla rojas: all those [37:45] in favor? [37:45] Opposed? [37:48] The ayes have it. [37:49] Item 9 request authorization to [37:51] petition the zoning commission [37:52] to adopt text amendments [37:54] implementing updates to article [37:56] 88 of the zoning code to [37:59] establish the new consolidated [38:00] process for a small clean [38:01] energy infrastructure pursuant [38:07] to the state's 255 cmr 29 and [38:09] establish use and regulations [38:11] for battery energy storage [38:11] assistance. [38:16] Christopher? [38:17] >> good evening. [38:20] My name is christopher maskis [38:23] and I'm a planner on the tam. [38:26] Tonight I'm joined to look at [38:28] the zoning code. [38:32] Pursuant to 225 cmr 29, this [38:35] introduces the local permit for [38:36] small clean energy [38:39] infrastructure and provides use [38:40] and energy storage systems. [38:42] I would now like to pass this [38:45] over to my colleague travis [38:45] anderson to begin our [38:50] presentation. [38:51] Good afternoon, everybody. [38:54] Next slide, please. [38:55] Today's agent we're just going [38:58] to do a quick overview of the [38:59] permit process. [39:00] I'll give a quick intro about [39:02] the types of clean energy [39:03] infrastructure that the city [39:05] will be looking at from a [39:07] consolidated local permit [39:07] perspective. [39:10] We'll go over the cmr 29 [39:11] requirements and procedures and [39:13] how that affects article 88 and [39:14] the zone [39:16] ing reform we need to do [39:16] there. [39:22] and also touch on the article [39:24] 88 battery energy zoning that [39:25] is a new amendment. [39:30] Next slide, please. [39:31] And next slide. [39:34] Why is the state doing a reform [39:35] for infrastructure? [39:38] This is a result of the 2024 [39:39] climate act which is mandating [39:42] the state to look at ways to [39:44] better enable processes and [39:46] procedures to permit energy [39:47] infrastructure of all scale [39:48] across the state. [39:50] This is in line with meeting [39:52] the state's climate goals in [39:54] the city of boston. [39:56] This permitting reform also [39:57] coincides with other permit [39:59] reform that's underway such as [40:00] article 80 modernization and [40:03] primary goals of the city and [40:08] state writ large to kind of [40:09] make these more prevalent [40:17] throughout the state and city. [40:19] The what is small energy clean [40:19] energy? [40:21] Under the state's definition, [40:23] this includes energy generation [40:25] infrastructure that's less than [40:26] 25 megawatt hours. [40:28] That includes solar panels, [40:36] wind turbines, and an aerobic [40:36] digest. [40:37] This is under a hundred [40:39] megawatt hours. [40:40] Primarily battery energy [40:41] storage is one of the main key [40:43] come poebts of that. [40:48] It looks at transmission and [40:49] distribution infrastructure. [40:51] So any corridor that's less [40:53] than one mile or an existing [40:55] corridor that has transmission [40:56] and distribution infrastructure [40:57] less than ten miles. [40:59] All these types of small energy [40:59] infrastructure will fall under [41:01] the city of boston's purview [41:03] for the consolidated local [41:03] permit. [41:04] Anything larger than this will [41:08] go through the state review [41:08] process. [41:10] Next slide, please. [41:13] So what is large clean energy [41:14] infrastructure not under the [41:15] city's purview? [41:17] Substations of any size or [41:18] scale, generation that's [41:21] greater than the 25 megawatt [41:23] hour threshold. [41:26] Storage greater than the 100 [41:28] megawatt threshold or [41:30] transmission and distribution [41:30] infrastructure. [41:32] We also want to highlight that [41:35] neither of these are data [41:35] sters. [41:37] They are not partcenters. [41:38] They are not part of either [41:41] clean energy definition that [41:43] the city has made. [41:44] That's something we're not [41:46] looking at today. [41:48] Now I'll pass it over. [41:50] >> thank you, travis. [41:51] My name is andrew plum. [41:53] I'm a planner on the conference [41:54] and planning team. [41:58] Next slide, please. [42:02] So what does 225 cmr require? [42:05] The city must adopt the [42:06] consolidated process and [42:11] updated zoning to include small [42:11] clean energy infrastructure in [42:12] the code. [42:13] There are certain specific [42:14] requirements from the state [42:16] which include the use of the [42:16] state's local permit [42:18] application, a guarantee of a [42:21] 12-month review, updating the [42:23] zoning bylaws to enable the new [42:25] permitting process as we have [42:27] no special permit in boston. [42:29] The designation of a local [42:30] government representative and [42:33] collecting a decommissioning [42:35] surety for all projects. [42:36] there is flexibility in the law [42:39] for how boston updates its zone [42:41] regulations and how it reviews [42:43] different scales of projects. [42:46] There's also flexibility in [42:48] what mitigation e have for [42:50] projects and how the overall [42:55] review process is run. [42:56] Outside of the law is energy [42:58] projects that basically choose [43:01] not to go in the consolidated [43:01] permit process. [43:03] We've called this sort of the [43:07] standard review. [43:09] Also ministerial permits which [43:12] are by isd or the fire [43:12] department. [43:15] Next slide, please. [43:17] So the proposed updates to [43:19] article 88 will establish the [43:19] consolidated local permit [43:20] process which will be [43:22] coordinated by the planning [43:22] department. [43:25] The updates provide clear, [43:29] predictable criteria for the [43:31] appropriate citing, permitting, [43:33] and review of all small clean [43:34] energy infrastructure [43:34] facilities. [43:36] And the decision for the [43:37] consolidated permit will be [43:39] issued by the director of the [43:40] bra in conjunction with the [43:41] bpda board. [43:42] And the state's requirements [43:45] for cmr 29 take effect on [43:47] OCTOBER 21st of this year. [43:51] Next slide, please. [43:52] So what departments participate [43:54] in the review process? [43:55] The departments listed on the [43:57] left in red will have the [43:59] review included in the [44:00] consolidated local permit which [44:02] is subject to that 12 month [44:04] review timeline. [44:05] The departments listed on the [44:07] right in blue will be included [44:09] in he review process to [44:10] provide feedback and to flag [44:12] any potential concerns early in [44:13] the process. [44:15] However, their official review [44:17] will appen after the [44:18] consolidated local permit [44:20] review and they are not subject [44:22] to hat 12-month deadline. [44:24] Next slide, please. [44:27] So this is an overview of the [44:28] process from when an [44:29] application is submitted to [44:32] when a decision is issued. [44:33] After an application is [44:34] submitted, the city will have [44:36] 30 days to determine if it is [44:37] complete. [44:39] Once it's deemed complete, the [44:44] 12-month clock will begin. [44:46] At the end of each department's [44:48] review, they will issue to the [44:48] department. [44:49] I'll go into more detail in a [44:50] second on that. [44:54] Next slide, please. [44:57] So what do departments review [44:57] for? [44:59] They will review for compliance [45:01] with doer's guidelines for [45:03] public health, safety, and [45:05] environmental standards and cmr [45:06] 29 which include both state and [45:06] federal requirements. [45:08] Local requirements will include [45:10] the standards and review [45:14] applicable to section 88.8 of [45:16] the draft zoning which lists [45:18] all reviews as part of the [45:20] consolidated review. [45:23] Permit applications for the [45:24] consolidated permit must [45:26] satisfy the criteria for all [45:31] local permits. [45:31] Next slide, please. [45:33] So the timeline of the [45:34] decision. [45:35] Each department must submit a [45:37] decision to either approve, [45:39] approve with conditions, or [45:41] deny an application. [45:43] again, you must issue the [45:45] decision within 12 months. [45:46] If we fail to meet that [45:48] timeline, that deadline, the [45:51] application will result in [45:52] constructive approval process [45:54] which is outlined in the law. [45:56] If the local government denies [45:59] that application, it MAY be [46:01] appealed to the sna state for [46:03] de novo or clean slate review. [46:04] Any denial the city makes must [46:08] be based on the standards [46:11] departments review for which I [46:12] outlined on the previous slide. [46:17] Next slide, please. [46:19] So bpda board will issue the [46:22] decision in conformance with [46:23] the state's requirement for one [46:27] approval to be issued. [46:28] An approval, again, will be [46:29] made before that 12-month [46:31] deadline. [46:35] If one department recommends [46:39] denial of the permit, each [46:40] department will finish their [46:43] review and issue a decision. [46:45] However, the bpda board will [46:46] then issue a decision for [46:47] denial for the entire permit. [46:48] I'll now pass the presentation [46:50] back to chris who will present [46:52] the proposed zoning in a bit [46:52] more detail. [46:59] Thank you. [47:01] >> thank you, andrew. [47:02] Next slide, please. [47:05] Firstly we want to emphasize [47:06] the consolidated local permit [47:08] process is mandated for [47:09] municipalities to offer but [47:11] optional for developers to take [47:12] advantage of. [47:15] Making this an opt-in pathway. [47:16] All clean energy infrastructure [47:17] that means the state definition [47:18] of small clean energy [47:19] infrastructure, meaning storage [47:21] facilities up to 100 megawatt [47:23] hours, generation facilities up [47:27] to 25 megawatts, and existing [47:29] transmission and distribution [47:30] less than ten miles long or a [47:31] new corridor less than one mile [47:33] long is able to seek approval [47:36] through the consolidated local [47:37] permit. [47:41] Next slide, please. [47:43] So when is a consolidated local [47:46] permit required? [47:48] Article 8 establishes [47:49] conditions where clean energy [47:50] infrastructure projects [47:51] specifically battery energy [47:52] storage systems are required to [47:54] seek approval through the [47:55] consolidated local permit [47:56] process. [47:57] This occurs when a battery [47:58] energy storage system is [48:04] proposed as the ain use of a [48:07] lot when it is proposed with a [48:09] site footprint greater than 400 [48:11] square feet as either a main or [48:13] accessory use of a lot, or is [48:15] proposed ith a fence greater [48:18] than 7 feet tall. [48:20] As a main or accessory use. [48:21] Next slide, please. [48:23] Why require the consolidated [48:24] local permit for certain [48:24] projects? [48:26] Approval through the [48:27] consolidated local permit makes [48:29] best an allowed use where it [48:30] would otherwise be conditional, [48:32] giving proponents certainty [48:34] while allowing the city to have [48:36] adequate oversight on design [48:37] elements such as bulk size and [48:40] site design. [48:43] Additional 225 cmr 29 and doer [48:44] guidelines outline clear [48:45] conditions for the projects to [48:47] meet for approval, along with [48:49] the additional discretion of [48:51] city of boston departments that [48:52] will join in for the [48:53] coordinated review process. [48:55] Finally, projects applying for [48:58] a consolidated local permit are [48:59] able to be approved with [49:01] conditions, allowing us to set [49:02] conditions to further mitigate [49:05] concerns related to size, bulk, [49:06] and overall design. [49:08] While the inclusion of the [49:09] consolidated permit process is [49:11] a key component of this [49:12] amendment, the amendment also [49:14] establishes best nd accessory [49:17] bests as a defined use in the [49:18] zoning code and provides [49:19] dimensional requirements for [49:22] both main and accessory use [49:23] battery energy storage. [49:24] To ensure these systems are [49:25] designed at an appropriate size [49:27] and scale for the surrounding [49:28] neighborhood context. [49:30] This amendment also clearly [49:33] defines how to measure battery [49:35] energy storage systems by [49:36] introducing the battery energy [49:37] storage system site footprint [49:41] for both main and accessory [49:41] use. [49:43] The previously mentioned [49:44] dimensional requirements are [49:45] applicable to the best site [49:46] footprint ensuring the entire [49:49] site remains contextual to the [49:50] surrounding neighborhood rather [49:51] than just the battery [49:51] equipment. [49:52] Finally, this amendment [49:54] establishes a financial surety [49:55] for certain types of small [49:56] clean energy infrastructure. [49:58] This allows the city of boston [50:00] to handle the decommissioning [50:02] and removal of small clean [50:03] energy infrastructure in the [50:04] case of abandonment without [50:06] bearing the associated costs. [50:12] Next slide, please. [50:18] As stated before, 225 cmr 29 [50:19] requires the adoption of this [50:20] process by municipalityties by [50:22] OCTOBER 1st, 2026. [50:24] as such, the timeline ensures [50:26] boston remains compliant with [50:27] the requirements of the state [50:29] law. [50:32] Next slide, please. [50:34] This concludes our presentation [50:35] regarding battery energy [50:36] storage systems and the [50:38] consolidated local permit. [50:39] Thank you and we'd be happy to [50:40] answer any questions you MAY [50:42] have. [50:42] >> priscilla rojas: thank you. [50:45] Questions or comments from the [50:45] board? [50:52] >> thank you, MADAM Chair. [50:55] Not so much a question. [50:56] This is my favorite vote I'll [50:57] cast today. [50:59] It is a project on this vry, [50:59] very important zoning [51:01] amendment. [51:03] It is my fervent hope a year [51:06] from now we vote on these [51:08] projects as often as we do on [51:08] conversions. [51:10] This is so needed. [51:13] Obviously I don't need to tell [51:15] people the purpose of [51:17] permitting more solar and wind [51:18] but also transition lines in [51:19] terms of delivering reliability [51:21] and supporting electrification. [51:22] I want to issue in on the [51:24] battery storage, because that's [51:26] a little newer but it is needed [51:28] as we talk about energy [51:29] affordability [51:29] affordability. [51:31] We're having a ebate in this [51:32] country about energy affordable [51:34] as we should. [51:35] In massachusetts we have among [51:37] the highest utility rates of [51:38] any state in the union. [51:40] And I'm a firm believer, you [51:41] know, I was very repetitious as [51:45] a former city councillor. [51:48] I'd say every time we speak on [51:50] this, a fiscal conservative [51:51] ought to be an [51:52] environmentalist. [51:56] That is precisely what the some [51:57] battery energy storage systems [51:57] do. [51:59] They provide better [51:59] reliability. [52:01] They provide etter delivery of [52:01] service. [52:02] They reduce grid demand. [52:03] And I can't talk about how [52:05] important that is. [52:06] Particularly solar is one [52:08] thing, but particularly with [52:08] wind. [52:10] We've seen this in so many [52:11] other ISOs across the united [52:12] states. [52:13] Wind blows the heaviest at the [52:14] night. [52:15] Usually in the middle of the [52:16] night in the wintertime when [52:17] grid demand is less. [52:19] You're able to procure that [52:20] type of energy and then shift [52:21] the peak. [52:24] You're saving your rate payers [52:24] money. [52:25] It's simple economics. [52:26] You buy low. [52:28] You sell it -- well, you [52:31] utilize it high I should say. [52:32] Utilize it high and you're [52:35] going too save rate payers [52:35] money. [52:38] This is a good policy, huge [52:42] kudos to governor healy and her [52:43] team. [52:44] And cue koes to mayor wu and [52:48] her team. [52:50] It is so appropriate that he [52:51] planning department which does [52:54] such incredible work mnaging, [52:55] planning, and development of [52:57] this city is sort of the [52:57] overseer. [53:00] And it's smart this board gets [53:00] to vote on it. [53:03] There's no shortage for other [53:05] departments to weigh in, ut [53:07] this is a good policy. [53:08] Travis, we've known each other [53:09] a long time. [53:10] It's great to continue in this [53:10] capacity. [53:16] So I'm ery excited for this [53:16] opportunity. [53:23] >> priscilla rojas: thank you. [53:24] This is fascinating. [53:27] I learned a lot about battery [53:27] storage. [53:28] I love being on the bard, [53:30] getting to earn about great [53:30] things. [53:32] But I wanted to reiterate, this [53:33] has nothing to do with data [53:33] center anything. [53:37] Right? [53:39] This is a -- just to streamline [53:40] the process; right? [53:44] That permitting process to kind [53:47] of speed this -- these projects [53:49] to service. [53:50] >> yes. [53:50] >> priscilla rojas: okay. [53:51] Yeah. [53:51] That's just all I wanted to [53:54] double check. [53:55] If there are no other further [53:56] questions or comments, motion [53:56] is in order. [53:58] >> so moved. [53:58] >> second. [53:59] >> priscilla rojas: all those [54:00] in favor? [54:00] Opposed? [54:01] Ayes have it. [54:01] Thank you so much. [54:06] >> thank you. [54:07] >> priscilla rojas: and I know [54:08] we had some people exit. [54:14] That was a popular item. [54:15] Councillor, thank you for [54:15] coming. [54:17] The floor is yours. [54:18] >> thank you. [54:20] I believe this is on item 12. [54:23] And I just want to as I start [54:24] thank felicia for stepping up [54:27] to the board as the chair of [54:29] planning development and [54:29] transportation. [54:30] Congratulations n your first [54:30] meeting. [54:32] We're so excited to see you in [54:34] this roll. [54:35] Dear chair rojas and members of [54:37] the board, I'd like to register [54:44] my voice in support of brigham [54:46] women's inp extension. [54:48] I look forward to working with [54:51] the institution on future IMPs [54:54] and improve necessary [54:55] improvements to patient care [54:56] and research. [54:57] Because they're not proposing [54:59] any new projects or additional [55:02] changes to their 2010 imp and [55:03] subsequent amendments as part [55:05] of this extension, I urge the [55:08] bpda board to support this [55:08] request. [55:11] And there's also a support [55:13] letter from mission hall nhs [55:15] from my district in strong [55:15] support. [55:16] Thank you. [55:17] >> priscilla rojas: great. [55:17] Thank you. [55:22] Item 10. [55:23] Request authorization to issue [55:24] a certification of approval [55:27] pursuant to article 80e of the [55:28] zoning ode for the proposed [55:31] construction of 24 residential [55:33] hypounits including four iz [55:35] units and nine car parking [55:37] spaces and 124 bicycle parking [55:41] spaces located through 14-18 [55:43] hannon street and to enter into [55:44] community benefits agreement [55:47] and take all related actions. [55:48] >> thank you. [55:50] Held le to all members of the [55:50] board. [55:54] My name is zoe duvall. [55:56] Before you to present the [55:58] article 80e small project [56:00] located at 1418 hannon street [56:01] in the dorchester neighborhood [56:02] of boston. [56:04] Next slide, please. [56:06] The project site comprises two [56:08] parcels and otals [56:10] approximately 10,691 square [56:11] feet of land. [56:14] The project site is occupied [56:16] with a vacant two-family home [56:19] and adjacent vacant lot. [56:21] Project proposes to demolish [56:22] the structure and construct a [56:24] new five-story residential [56:28] building containing 24 [56:33] homeownership units. [56:35] The units will comprise one [56:37] studio, seven one bedrooms, 12 [56:40] two bedrooms, and 4 [56:41] three-bedroom units. [56:43] The ground floor also has nine [56:45] off-street parking space and 24 [56:47] long-term bike parking spaces. [56:49] The small project review [56:50] application was filed on [56:52] FEBRUARY 19th, 2026. [56:52] The public comment eriod in [56:55] connection with the proponent [56:56] submission was originally [56:59] intended to end on MARCH 19th, [57:00] 2026, and was voluntarily [57:02] extended to APRIL 3rd, 2026. [57:04] The planning department [57:05] sponsored a public meeting on [57:09] MARCH 17th which was noticed [57:10] through the planning department [57:11] neighborhood distribution list [57:13] and events calendar for both [57:16] the dorchester and mattapan [57:17] neighborhoods. [57:18] I'll hand over to my colleague [57:19] jason to take you through the [57:20] planning context. [57:20] Thank you. [57:22] >> good evening, MADAM Chair, [57:25] members of the board. [57:27] I am jason Mcdonald, the [57:28] planner assigned to his [57:29] project. [57:33] Next slide, please. [57:33] All right. [57:36] This is located within the [57:39] 3,000 sub district of the [57:40] greater mattapan neighborhood. [57:42] The surrounding context is [57:44] mostly residential at various [57:46] scales including multiple [57:48] multifamily building around it. [57:49] Directly south of the proposed [57:52] site, you can see in red there [57:54] is the mattapan street corridor [57:56] which cuts all the way through [57:59] from basic forest hills and [58:01] almost the entire width of [58:02] dorchester. [58:04] Next to that would be directly [58:07] south you can see to morton [58:13] street stop to the fairmont [58:13] line. [58:16] Within the fairmont indigo [58:18] corridor plan, a study that was [58:21] focused on the short-term and [58:22] long-term strategies with job [58:24] access along this corridor and [58:25] specifically around the morton [58:27] street stop. [58:29] The new residential stop of [58:31] higher density was encouraged [58:33] to promote he use of the [58:34] station. [58:35] Additionally, this site is [58:38] directly adjacent to some new [58:40] squares and street zoning that [58:41] came from plan mattapan. [58:42] However, the site itself was [58:45] not rezoned due to it just not [58:46] being within the geography of [58:48] the plan. [58:50] So the proposed project is [58:52] currently seeking zoning relief [58:56] for the use excessive height, [58:58] insufficient parking, [59:00] insufficient rear, front, and [59:01] side setbacks. [59:02] While taking into consideration [59:04] the built form of this block [59:06] and the proposed project [59:08] unusual parcelization, the [59:13] staff reviewed it to ensure the [59:14] compatibility of the design [59:16] with its context in particular [59:20] with the massing and adherence. [59:23] i will now pass to my colleague [59:25] andrew from urban design. [59:26] >> good afternoon. [59:28] My name is andrew zimmerman and [59:30] I'm the rban designer assigned [59:32] to this project. [59:35] So the site plan you see, this [59:37] sets the building back to align [59:38] with complete streets [59:40] guidelines and establishing a [59:41] pedestrian-oriented frontage [59:43] along hannon street. [59:44] Street scape enhancements [59:47] include removing an obsolete [59:49] curb cut, installing visitor [59:51] city standard bike racks, [59:52] implanting three new street [59:54] trees to enrich he pedestrian [59:55] experience. [59:56] In addition to these [59:57] improvements, the sidewalk will [59:59] be reconstructed for ada [59:59] accessibility. [1:00:05] Next slide. [1:00:09] The five-story building uses a [1:00:11] front yard setback and fifth [1:00:13] story step back to mitigate the [1:00:15] impacts of its height along [1:00:16] hannon street. [1:00:17] It is composed of four qual [1:00:20] length bays to mimic local town [1:00:22] home architecture creating a [1:00:24] distinct frontage unified by a [1:00:28] cohesive color material palate. [1:00:29] Working closely with the [1:00:30] planning department, the [1:00:32] proponents significantly [1:00:33] revised the ground floor layout [1:00:35] and overall building massing to [1:00:37] better engage the street in the [1:00:38] surrounding neighborhood. [1:00:41] The building utilizes an [1:00:42] extensive roof deck and ground [1:00:43] floor patio space. [1:00:47] With that, I'll turn it back to [1:00:49] zoe. [1:00:51] >> lastly, just noting that [1:00:52] this project has been [1:00:53] responsive to both neighborhood [1:00:55] and planning staff feedback [1:00:56] throughout the review process [1:00:59] resulting in a change from [1:01:00] rental to homeownership. [1:01:01] Revisions to the ground floor [1:01:04] design, the massing and facade [1:01:06] and the inclusion of three new [1:01:07] street trees. [1:01:08] This includes our presentation [1:01:10] for this item and myself and [1:01:11] the development team is [1:01:11] available to answer any [1:01:14] questions you MAY have. [1:01:16] >> priscilla rojas: thank you. [1:01:17] Any uestions or comments from [1:01:20] the board? [1:01:20] Okay. [1:01:21] Hearing and seeing none, motion [1:01:22] is in order. [1:01:23] >> so moved. [1:01:23] >> second. [1:01:24] >> priscilla rojas: all those [1:01:25] in favor? [1:01:25] Opposed? [1:01:26] The ayes have it. [1:01:27] Motion passes. [1:01:29] Thank you so much. [1:01:29] And almost welcome to the [1:01:37] neighborhood. [1:01:37] All right. [1:01:40] Item 11. [1:01:42] Request authorization to issue [1:01:43] a determination waiving further [1:01:46] review pursuant to section [1:01:48] 80a-6 of the zoning code in [1:01:50] connection with the notice of [1:01:52] project change for the proposed [1:01:54] construction of 62 all [1:01:56] affordable residential units, [1:01:58] 31 car parking spaces, and 77 [1:02:01] bicycle arking paces located [1:02:08] at 2shawsheen road and issue [1:02:09] issue one or more [1:02:11] certifications of compliance or [1:02:12] partial certifications of [1:02:13] compliance for the proposed [1:02:15] project sur sunt to section [1:02:18] 80b-6 of the zoning code upon [1:02:19] successful completion of the [1:02:21] article 80b large project [1:02:23] review process, and execute and [1:02:24] deliver a cooperation agreement [1:02:26] and transportation access plan [1:02:26] agreement. [1:02:27] >> thank you. [1:02:31] My name is camille [1:02:37] platt-decosta and I'm a senior [1:02:37] manager. [1:02:38] This is a project change [1:02:42] located at 2 shz shawsheen road [1:02:47] in boston. [1:02:49] Boston cdc proposes to [1:02:50] construct two residential [1:02:52] buildings with approximately [1:02:55] 70,080 square feet of the ross [1:02:58] floor area total. [1:03:02] The mpc calls for homeownership [1:03:04] to rental making the project [1:03:05] fully rental but income [1:03:06] restricted. [1:03:07] The hange to the north [1:03:08] building also includes an [1:03:09] increase in the number of units [1:03:11] previously approved from 22 to [1:03:13] 27 with the entire project then [1:03:15] going from a total of 57 units [1:03:17] to 62 units. [1:03:21] The mpc also requires for the [1:03:24] removal of four parking spaces. [1:03:26] The project notification form [1:03:28] was originally filed on [1:03:30] SEPTEMBER 19th of 2022 with [1:03:31] approval by the bpda board on [1:03:33] OCTOBER 12th of 2023. [1:03:36] The mpc was then filed on JUNE [1:03:37] 9th of 2026. [1:03:39] A joint iag and public meeting [1:03:43] was held on JULY 1st, 2026. [1:03:46] I will now turn it over to walk [1:03:48] through the planning context [1:03:48] considered before the [1:03:50] development team begins their [1:03:50] presentation. [1:03:52] Thank you. [1:03:54] >> thank you, camille. [1:03:55] Good evening. [1:04:03] My name is ford del vecchio. [1:04:05] As noted earlier, the proposed [1:04:07] project design maintains 27 [1:04:08] dwelling units within [1:04:10] substantially the same building [1:04:14] footprint as previously stated. [1:04:17] Additional, side adjustments [1:04:18] include an increase in the [1:04:20] front yard, reduction in the [1:04:22] rear yard, and reduction in the [1:04:23] left side yard as well. [1:04:24] As a result of these overall [1:04:25] modifications, zoning would be [1:04:27] required from the zoning board [1:04:27] of appeal. [1:04:30] In reviewing the modified [1:04:32] design, staff focus on several [1:04:34] key contextual factors. [1:04:36] That was not a focus area for [1:04:38] the new zoning associated with [1:04:38] plan east boston. [1:04:43] It directly adjoins lower scale [1:04:44] residential development along [1:04:46] barnes avenue. [1:04:49] Massing articulation to ensure [1:04:51] an appropriate scale transition [1:04:54] between the two settings. [1:04:56] Staff evaluated critical [1:04:58] resiliency measures including [1:04:59] raised ground floor conditions [1:05:01] and flood proofing strategies. [1:05:05] Finally, staff reviewed site [1:05:07] plans elements to address three [1:05:09] elevated conditions, ensure [1:05:11] sufficient setbacks, and [1:05:13] establish dimensional [1:05:15] dimensions for public access [1:05:17] easement to the winthrop [1:05:18] greenway. [1:05:19] And now the developer will [1:05:23] present in more detail. [1:05:25] >> thank you, MADAM Chair, [1:05:30] members of the bard, director [1:05:31] shen, here is the project [1:05:38] attorney today. [1:05:41] Also we me are I have joe [1:05:43] lambert from the design. [1:05:45] As was mentioned, our client is [1:05:47] the east boston cdc and I want [1:05:49] to point out that this project [1:05:55] at 80 and 82 shawsheen road [1:05:57] will still remain affordable. [1:06:01] The driving factor of the [1:06:03] proposed changes I'm about to [1:06:04] go over is because of state [1:06:06] funding constraints and [1:06:08] particularly on the [1:06:08] homeownership piece. [1:06:11] The first proposed change in [1:06:14] the npc was to change the 82 [1:06:21] shauns shawsheen building which [1:06:26] was original a condominium [1:06:29] homeownership to all rental. [1:06:33] So the ami was between 80% and [1:06:33] 100%. [1:06:35] We're now between 0% to 60% on [1:06:36] that building. [1:06:38] So much better with the rental [1:06:40] component. [1:06:42] Secondly, we're adding [1:06:43] additional units. [1:06:45] We're going from 57 total to [1:06:45] 62. [1:06:47] So there's more affordable [1:06:49] units on the building now by [1:06:52] adding those additional units [1:06:52] as well. [1:06:54] Part of the driving factor of [1:06:57] the changes in reducing the [1:06:58] parking spaces. [1:06:59] So we're asking for reduction [1:07:02] of four spaces in the one [1:07:03] loading dock on the two [1:07:04] buildings is because now that [1:07:06] this becomes full rental, we're [1:07:07] looking for community room for [1:07:13] those residents as well as a [1:07:14] laundry room for a shared [1:07:15] facility for those folks as [1:07:18] well. [1:07:20] Some of the other changes is [1:07:23] addition of eight one beds and [1:07:25] two two beds and the removal of [1:07:26] three three beds nd two four [1:07:29] bed units. [1:07:30] So redistributing some space [1:07:33] all because of funding again. [1:07:34] And minor design changes. [1:07:36] One of the building reduces [1:07:39] from five stories to four [1:07:41] modifying the raised parapets [1:07:44] and hanging the window designs [1:07:44] as well. [1:07:46] If we could go to the next [1:07:47] slide, I'm briefly going to run [1:07:47] through. [1:07:49] This shows the location of the [1:07:49] site. [1:07:52] It's within a short ten-minute [1:07:55] walk to the mbta station in [1:07:56] orient heights and there's [1:07:59] major bus routes that run right [1:08:05] along saratoga street which [1:08:06] abuts shawsheen road. [1:08:08] This is the former AUGUST oil [1:08:09] brothers site. [1:08:11] It was a commercial oil truck [1:08:12] storage facility. [1:08:13] This now brings housing or [1:08:14] needed housing to this [1:08:16] particular site which is in an [1:08:17] economic development area. [1:08:20] Next slide, please. [1:08:22] These are just some site [1:08:22] pictures. [1:08:24] To familiarize the board and I [1:08:25] know this was approved back in [1:08:31] 2023, but that's the shawsheen [1:08:33] road and the saratoga abutting [1:08:34] street which we have access [1:08:36] through both of those streets [1:08:38] to the property. [1:08:40] This just shows you some [1:08:41] current conditions as has been [1:08:48] operated and abuts the bell [1:08:49] isle marsh as well. [1:08:51] This shows the two buildings [1:08:52] with that large landscape area [1:08:53] in between. [1:08:57] This is a dead-end street. [1:08:58] So it complements that back [1:08:59] area. [1:09:01] And you can just see on the [1:09:02] right-hand side where we [1:09:03] removed some of the parking [1:09:05] spaces and the loading zone on [1:09:07] the two buildings and put those [1:09:13] shared common space areas. [1:09:14] And this goes over some of the [1:09:16] changes we had to make to some [1:09:19] of the units and the finding [1:09:19] ing [1:09:19] ing [1:09:23] -- funding units that caused [1:09:23] the change. [1:09:25] and this goes over the revised [1:09:26] parking plan. [1:09:28] Four spaces total and the one [1:09:29] loading space over those two [1:09:30] buildings. [1:09:32] But as I had mentioned, we're [1:09:35] ten minutes from the t station. [1:09:38] Next slide, please. [1:09:41] And again, this shows the two [1:09:42] building, the parking areas. [1:09:44] And with that, I can pause to [1:09:46] answer any questions that the [1:09:46] board MAY have. [1:09:48] If we want to go to the last [1:09:51] slide, it shows a nice [1:09:52] rendering. [1:09:53] If we want to just continue. [1:09:55] Right here. [1:09:55] Perfect. [1:09:56] Just so the board can see sort [1:09:58] of the -- and that landscape [1:10:00] area in between which [1:10:01] complements both buildings. [1:10:02] With that, we can answer any [1:10:05] questions. [1:10:05] >> priscilla rojas: any [1:10:09] questions or comments from the [1:10:09] board? [1:10:10] >> matt o'malley: thank you, [1:10:11] MADAM Chair. [1:10:12] Obviously you can tell the [1:10:13] support that's gone in. [1:10:13] Looks great. [1:10:15] It's a great neighborhood. [1:10:16] Fully supported. [1:10:19] Curious and you MAY have said [1:10:19] this. [1:10:21] Does he proximity to the [1:10:23] wetlands provide any additional [1:10:23] mitigation that has to be done [1:10:24] on site? [1:10:26] >> not on site. [1:10:28] There's talk about continuing [1:10:30] the greenway through that area [1:10:32] which we would be obviously [1:10:34] amenable to and would talk to [1:10:35] if that comes up further. [1:10:38] But no, everything -- this was [1:10:39] contained on that particular [1:10:39] site. [1:10:40] yeah. [1:10:41] >> matt o'malley: it's great. [1:10:42] Good luck. [1:10:44] Thank you. [1:10:44] >> priscilla rojas: any other [1:10:45] questions or comments? [1:10:46] A motion is in order. [1:10:47] >> so moved. [1:10:48] >> second. [1:10:49] >> priscilla rojas: all those [1:10:49] in favor? [1:10:50] Opposed? [1:10:51] The ayes have it. [1:10:51] Thank you very much. [1:10:53] >> thank you so much. [1:10:56] >> priscilla rojas: all right. [1:10:56] Item 12. [1:10:58] MR. O'malley, are you going to [1:11:01] recuse yourself on this one? [1:11:01] Oh, no? [1:11:03] Sorry. [1:11:07] I must be on he wrong-is [1:11:07] it? [1:11:11] It's okay. [1:11:13] Item 12, request authorization [1:11:15] to issue an adequacy [1:11:18] determination pursuant to [1:11:21] section 80d-5.4 of the zoning [1:11:23] code for the proposed renewal [1:11:25] and extension of the brigham [1:11:26] and women's hospital [1:11:28] institutional master plan for a [1:11:30] period of five years ending in [1:11:31] 2031 and to take all related [1:11:32] actions. [1:11:34] >> thank you. [1:11:36] MADAM Chair, members of he [1:11:37] board. [1:11:40] My name is jason farrell from [1:11:41] the development of division. [1:11:43] I'm here before you today to [1:11:44] discuss the proposed renewal [1:11:46] and five-year extension with no [1:11:48] changes to the master plan for [1:11:52] brigham and women's hospital. [1:11:56] The 2010 imp was extended for a [1:11:58] period of two years in previous [1:11:59] years. [1:12:00] The hospital has operated its [1:12:02] campus in a manner consistent [1:12:05] with the 2010 imp and plans to [1:12:07] do so over the course of the [1:12:08] five-year extension. [1:12:10] On JUNE is 12th, 2026, the [1:12:11] proponent filed an [1:12:13] institutional master plan [1:12:14] notification form for the [1:12:16] proposed renewal and five-year [1:12:18] extension pursuant to article [1:12:19] 80d of the code. [1:12:21] Since this is an imp extension [1:12:23] with no changes, a public [1:12:24] meeting was available upon [1:12:26] request but none was requested. [1:12:27] Public comment period ended on [1:12:29] JULY 15th, 2026. [1:12:31] I'll now pass it over to the [1:12:32] team for some brief remarks and [1:12:33] then to answer any questions [1:12:39] you MAY have. [1:12:41] >> good afternoon, CHAIRWOMAN [1:12:45] Rojas, members of the board, [1:12:48] director schenn. [1:12:53] My name is wang nguyen. [1:12:55] I'm here today to request [1:12:57] approval for a five-year [1:12:58] renewal of brigham and women's [1:13:00] institutional master plan with [1:13:03] unchanged plans until AUGUST [1:13:03] 2031. [1:13:05] Brigham has undertaken [1:13:06] development and operations in a [1:13:08] manner consistent with the [1:13:15] 2010 imp and has no new plans [1:13:17] for institutional project. [1:13:19] The hale building for [1:13:20] transformative medicine, the [1:13:22] office building, several campus [1:13:24] additions including the ed and [1:13:25] nicu expansions. [1:13:28] And the stoneman centennial [1:13:30] park have all been completed. [1:13:32] In addition, the meaningful [1:13:34] community partnerships we have [1:13:35] have resulted in the [1:13:37] development of housing and [1:13:39] community center at mosaic on [1:13:45] the riverway with tenants of [1:13:45] harvard. [1:13:48] And construction of the fenwood [1:13:50] inn for clients of the [1:13:51] commonwealth department of [1:13:51] mental health. [1:13:55] As you MAY know, the brigham [1:13:56] leadership is in the early [1:13:58] stages of planning for a [1:13:59] project announced last year [1:14:02] that will enable us to [1:14:05] modernize our campus and [1:14:07] achieve all single inpatient [1:14:07] rooms. [1:14:09] Single inpatient rooms reduce [1:14:10] the risk of infection, provide [1:14:12] space for modern technology, [1:14:14] equipment, and families. [1:14:15] And improve the environment [1:14:17] care for patients and their [1:14:19] families. [1:14:20] Preliminary planning is [1:14:22] underway to determine the scope [1:14:23] of the future project, and we [1:14:29] look forward to coming to the [1:14:32] bpda in the future with a new [1:14:34] imp when the time s right. [1:14:36] We are very proud of the [1:14:38] brigham oes's robust community [1:14:39] benefits and partnerships hat [1:14:40] enable us to deliver [1:14:41] exceptional health care, [1:14:45] education, and easily [1:14:46] accessible and essential health [1:14:47] care services to our boston [1:14:48] communities. [1:14:49] Our community benefits include [1:14:52] over $7 million in pilot [1:14:55] contributions in 2026 providing [1:14:58] essential health care services [1:15:00] in the community including care [1:15:02] at southern jamaica plain [1:15:04] health center and brookside [1:15:05] community health centers. [1:15:07] Providing care for over 50,000 [1:15:09] inpatients and 1.5 million [1:15:11] outpatients annually. [1:15:13] And employing 18,000 people [1:15:15] over 30% of whom are city of [1:15:16] boston residents. [1:15:17] Thank you for your time today. [1:15:21] With me are nancy welsh and tim [1:15:21] gelvin. [1:15:22] we're here to answer any [1:15:24] questions the board MAY have. [1:15:25] >> priscilla rojas: thank you. [1:15:29] Questions or comments from the [1:15:30] board? [1:15:32] Well, just a comment. [1:15:35] I just want to thank you for [1:15:37] your contributions to the city. [1:15:38] I think many of us have [1:15:40] probably been one of those 1.5 [1:15:46] million people that have been [1:15:49] serviced by brigham women's. [1:15:52] So with pleasure I would like a [1:15:52] motion. [1:15:54] >> so moved. [1:15:54] >> second. [1:15:55] >> priscilla rojas: all those [1:15:56] in favor? [1:15:56] Opposed? [1:15:58] The ayes have it. [1:15:59] Thank you very much. [1:16:02] Good luck. [1:16:07] Okay. [1:16:11] Item 13. [1:16:12] Request authorization to issue [1:16:15] a scoping determination waiving [1:16:16] further review pursuant to [1:16:20] article 80b-5.4d of the zoning [1:16:22] code or the proposed [1:16:24] construction of 105 fully [1:16:26] affordable residential rental [1:16:28] units, 31 car parking spaces, [1:16:31] and 105 bicycle parking spaces [1:16:33] located at 1590 blue hill [1:16:34] avenue. [1:16:35] To issue a certification of [1:16:37] compliance for the proposed [1:16:40] project under section 80b-6 of [1:16:41] the code upon successful [1:16:42] completion of the article 80 [1:16:45] review process, and to enter [1:16:46] into a cooperation agreement [1:16:47] and transportation access plan [1:16:49] agreement and take all related [1:16:50] actions. [1:16:50] Camille? [1:16:52] >> thank you again MADAME [1:16:56] Chair. [1:16:58] My name is camille. [1:17:02] The proposed project before you [1:17:05] is an article 80b large project [1:17:07] located at 1590 blue hill [1:17:08] avenue in mattapan. [1:17:11] The proponent is proposing to [1:17:12] demolish the existing building [1:17:13] on the project site and [1:17:15] construct a zoning compliant [1:17:17] approximately 120,000 square [1:17:19] feet, six-story building with [1:17:20] approximately 1,000 square feet [1:17:22] of ground floor retail and/or [1:17:24] community space along bull hill [1:17:26] avenue with 31 surface parking [1:17:26] spaces. [1:17:29] The proposed project will [1:17:30] include widened sidewalks, [1:17:33] dedicated furnishes zone, and [1:17:34] landscaped open space areas. [1:17:36] A portion of the site ill be [1:17:37] preserved to potentially [1:17:38] support a future public [1:17:40] pedestrian path through the [1:17:41] site and redevelopment on the [1:17:43] abutting 443 to 447 river [1:17:44] street parcel. [1:17:46] A letter of intent was filed on [1:17:49] APRIL 23rd of 2026. [1:17:51] The form was subsequently filed [1:17:53] on MAY 12th of 2026. [1:17:54] A virtual public meeting was [1:17:58] held via zoom on JUNE 9th of [1:17:59] 2026. [1:18:01] The meeting was well intended [1:18:03] and the project received [1:18:04] support from community members [1:18:04] during that meeting. [1:18:07] I will now turn it over to ford [1:18:10] to walk us through the ontext [1:18:11] that was considered before the [1:18:12] development team begins their [1:18:12] presentation. [1:18:25] Thank you. [1:18:28] >> thank you. [1:18:30] This project s comprised of [1:18:33] approximately 42,240 square [1:18:35] feet of the blue hill avenue to [1:18:38] the west existing retail [1:18:40] building long blue hill avenue. [1:18:42] It was a zoning district that [1:18:44] was recently adopted. [1:18:46] all propoeds uses are allowed [1:18:48] as of right in the proposed [1:18:50] project has been designed to [1:18:51] meet all dimensional [1:18:51] requirements. [1:18:54] The current site is occupied by [1:18:57] at least 28,700 square feet [1:18:59] auto repair and service garage [1:19:03] owned by the Mckeon family. [1:19:04] Proposed project less than one [1:19:06] quarter mile from the river [1:19:08] trail, the mbta trolley line, [1:19:11] the mbta blue hill extension of [1:19:12] the commuter rail line, and the [1:19:13] border etween the city of [1:19:16] boston and milton. [1:19:18] Plan mattapan adopted in MAY [1:19:19] 2023 identifies blue hill [1:19:23] avenue as a major thoroughfare [1:19:24] characterized by heavy traffic, [1:19:27] frequent parking turnover, and [1:19:29] high transit demand. [1:19:30] Plan mattapan was an initiative [1:19:33] that used community feedback to [1:19:35] craft an equitable, [1:19:37] community-driven future for [1:19:37] mattapan. [1:19:39] New residents have affordable [1:19:40] housing options. [1:19:42] They have safe and reliable [1:19:44] transit connections to jobs, [1:19:46] schools, and throughout boston [1:19:47] and create neighborhood nodes [1:19:49] that will home to vibrant [1:19:50] thriving local businesses. [1:19:51] This project helps to advance [1:19:53] these goals greatly. [1:19:55] The proposed project will [1:19:56] advance concurrently with the [1:19:58] city and mbta's blue hill [1:20:00] avenue redesign project [1:20:02] requiring ongoing coordination [1:20:04] with planned infrastructure [1:20:04] upgrades. [1:20:07] Given the proposed project's [1:20:08] multifamily residential [1:20:10] character, it represents the [1:20:11] appropriate land use. [1:20:12] Thank you and I will now turn [1:20:14] over to the developer to [1:20:19] present in more detail. [1:20:20] >> great. [1:20:21] Thank you. [1:20:23] MADAM Chair, members of the [1:20:23] board. [1:20:25] I'm bill grogan for urban [1:20:26] affairs and we're excited to be [1:20:28] here with you today and share [1:20:30] our vision for the [1:20:33] redevelopment of 1590 blue hill [1:20:34] avenue. [1:20:35] This development is a second [1:20:36] partnership between the [1:20:38] planning office and jge [1:20:38] development. [1:20:40] We've come together as [1:20:41] community-driven partners to [1:20:42] create a transformative [1:20:43] development that builds on the [1:20:46] legacy of a long standing [1:20:50] family-owned property to create [1:20:53] affordable and workforce rental [1:20:56] housing that is consistent with [1:21:00] compliant with he plan. [1:21:03] We've assembled an experienced [1:21:05] and qualified team and we look [1:21:06] forward to sharing with you [1:21:06] today. [1:21:08] We have focused on creating a [1:21:10] development for the vision [1:21:12] goals set forth in plan [1:21:13] mattapan [1:21:13] mattapan. [1:21:14] Part of that approach, we [1:21:15] believe in creating development [1:21:16] that make housing available to [1:21:18] a wide range of households [1:21:19] across different income levels. [1:21:22] So we are proposing a 105-unit [1:21:23] affordable and workforce family [1:21:25] rental housing development that [1:21:27] will be predominantly two and [1:21:28] three bedrooms and will be [1:21:30] affordable to households [1:21:33] earning 30% and 80% to respond [1:21:40] to the needs of the community. [1:21:43] The development will include [1:21:45] long blue hill avenue and [1:21:47] public realm improvement which [1:21:49] will further ctivate mattapan [1:21:50] square. [1:21:52] I'd like to turn it over now [1:21:58] for the design slides. [1:22:00] >> good evening, MADAM Chair, [1:22:03] members of the board. [1:22:03] Director [1:22:04] director shen. [1:22:09] We have these photos up here. [1:22:11] You can see the building on the [1:22:12] upper left-hand side of the [1:22:13] page. [1:22:14] And the other street images. [1:22:17] Next slide, please. [1:22:18] In this image, you can see the [1:22:20] existing building footprint in [1:22:23] red and the site of the [1:22:24] property line and black lines [1:22:25] around it. [1:22:27] Next slide, please. [1:22:31] In this slide, you can see the [1:22:33] grade of the site as it is [1:22:35] relative to blue hill avenue, [1:22:37] relatively flat with a higher [1:22:38] unused portion in the rear. [1:22:40] Next slide, please. [1:22:42] Here you can see in red the [1:22:43] building footprint as it meets [1:22:45] grade and a dashed red line [1:22:46] showing the line above that [1:22:48] reaches out over to the unused [1:22:51] ed portion of the site. [1:22:53] You can also see the proposed [1:22:55] paved area pulled off of the [1:22:55] street. [1:22:58] Next slide, please. [1:23:02] As the building rises, you can [1:23:05] see the maintained street wall [1:23:06] on blue hill avenue. [1:23:07] Next slide, pease. [1:23:11] As we continue to rise, we get [1:23:15] up to a height of 65 feet [1:23:17] adjacent concurrent with other [1:23:18] urban buildings in the area. [1:23:20] Next slide, please. [1:23:21] Looking at the first floor a [1:23:23] little more closely, you can [1:23:25] see the lobby area in blue, [1:23:29] bike parking in orange, moving [1:23:32] in and out zones in green. [1:23:35] utility trash area in red and [1:23:42] the public space in yellow. [1:23:43] Next slide. [1:23:44] You can see the building is [1:23:46] primarily family oriented with [1:23:48] two and three bedroom units [1:23:49] distributed throughout the [1:23:49] building. [1:23:53] Next slide, please. [1:23:54] Here is a portion of a site [1:23:55] we're excited to see. [1:23:57] We are reaching out over to the [1:23:59] higher grade area of the site [1:24:02] where we are providing a lot of [1:24:04] space to the occupants of the [1:24:04] building. [1:24:05] You can see a little more [1:24:06] closely how the parking is [1:24:09] pulled away from the street [1:24:10] frontage and even recessed [1:24:13] underneath the building. [1:24:15] Next slide. [1:24:16] Here we get into a little bit [1:24:18] of materiality of the area. [1:24:22] There's a lot of masonry. [1:24:24] A lot of eige colors. [1:24:26] This is emulated in the [1:24:26] building. [1:24:28] Next slide, please. [1:24:29] Getting into some of the [1:24:32] imagery, this is across the [1:24:35] street of blue hill avenue [1:24:36] looking at the front of the [1:24:39] building you see a lot of brick [1:24:40] elements, two tones, bronze [1:24:44] material. [1:24:45] Shown here more clearly are [1:24:46] those elements. [1:24:47] There's two tones of brick as [1:24:49] you see in the white and tan [1:24:51] portions of the building with [1:24:52] bronze elements wrapping around [1:24:52] it. [1:24:54] Next slide. [1:24:56] Here we have a view looking [1:25:02] north up blue hill avenue. [1:25:03] Here we are also at blue hill [1:25:06] avenue looking south. [1:25:07] Slightly closer to the [1:25:07] building. [1:25:09] you see the entry and some of [1:25:12] the architectural motifs. [1:25:14] Again a little closer looking [1:25:15] from blue hill avenue to the [1:25:16] south. [1:25:17] Next slide. [1:25:19] Here we are to the southeast of [1:25:23] the building looking at it [1:25:25] within its context. [1:25:26] Next slide. [1:25:27] And again, a little closer to [1:25:34] the building. [1:25:35] Thank you. [1:25:36] At this time we'll take any [1:25:37] questions. [1:25:38] >> priscilla rojas: thank you. [1:25:39] Questions or comments from the [1:25:42] board? [1:25:43] >> matt o'malley: couple, MADAM [1:25:43] Chair. [1:25:45] First of all, congratulations. [1:25:46] Looks like a great project. [1:25:48] Love the design and two tone. [1:25:51] I especially love that fifth [1:25:52] bullet point of sustainability. [1:25:56] So you are going to do rooftop [1:25:57] pv. [1:25:57] That's great. [1:26:00] Every time we see rooftop ready [1:26:01] which it has to be. [1:26:03] So how many kilowatts or [1:26:04] megawatts are you going to [1:26:10] have? [1:26:11] >> good evening. [1:26:13] Jonathan garland with jge. [1:26:14] Nice to see you all. [1:26:15] So we don't know just yet. [1:26:17] We're in the early phases. [1:26:20] So we're working to satisfy the [1:26:21] mechanical needs on the [1:26:24] building with hvac. [1:26:25] But every other square foot of [1:26:27] roof spate will be dedicated to [1:26:28] solar pv. [1:26:29] >> matt o'malley: just to be [1:26:30] clear, you wouldn't be able to [1:26:31] cover the entire because of [1:26:33] other neds, but even a [1:26:34] significant amount given that [1:26:35] height, given the fact there's [1:26:37] not the same sort of tree [1:26:38] canopy surrounding or other [1:26:39] large buildings. [1:26:41] You could probably have a [1:26:42] pretty decent amount that could [1:26:45] then to my earlier point help [1:26:47] power some of the common areas [1:26:49] and certainly reduce utility [1:26:50] costs. [1:26:51] >> that's our goal. [1:26:55] It's got great solar or [1:26:56] genation as well. [1:26:56] >> matt o'malley: thank you for [1:26:58] doing that. [1:27:00] It's proving hat we ought not [1:27:02] put sustainability and [1:27:02] affordability in competition [1:27:03] with one another. [1:27:05] They should be serving on the [1:27:06] same track. [1:27:08] Well done. [1:27:08] >> raheem shepard: since you [1:27:10] said that, I will start with [1:27:12] affordability and [1:27:13] accountability when it comes to [1:27:15] the construction as well. [1:27:17] I hope we can see responsible [1:27:19] contractors on these projects, [1:27:20] especially these larger [1:27:21] projects in the community. [1:27:26] I was looking at right here. [1:27:28] 11 three bedrooms. [1:27:30] I wish I could see more [1:27:32] especially for more families [1:27:33] living in mattapan square. [1:27:35] The rendering to your left, [1:27:37] that one hasn't been built yet. [1:27:40] The one in similar size? [1:27:41] >> yes. [1:27:42] >> raheem shepard: have you [1:27:43] heard nything on the streets [1:27:46] of which ne MAY go first? [1:27:48] >> no, we haven't. [1:27:49] >> raheem shepard: and I only [1:27:51] ask that because, you know, [1:27:52] whichever project, that's going [1:27:54] to be significant. [1:27:56] In your project is directly on [1:27:58] the main strip of blue hill [1:27:58] avenue. [1:28:00] that one is kind of on the [1:28:02] curve a bit. [1:28:05] I think hat and the indigo [1:28:07] block project way down the [1:28:09] block and other end of the [1:28:10] street, going south. [1:28:12] You know, in between there I [1:28:14] hope to see some of the rest of [1:28:15] these places get built to the [1:28:16] same magnitude. [1:28:19] But I'm happy to see squares [1:28:20] and streets become successful. [1:28:24] >> and if I MAY, we definitely [1:28:25] appreciate the city's [1:28:27] partnership working with us. [1:28:30] I was chatting with bill [1:28:31] earlier, my co-developer. [1:28:36] We've seen a tremendous amount [1:28:37] of cooperation on his in [1:28:39] particular in terms of [1:28:40] predictability, getting through [1:28:42] the process, and efficiency in [1:28:42] doing so. [1:28:44] And even the squares and [1:28:46] streets, it's helped us create [1:28:48] as of right projects like this [1:28:50] where we can help solve the [1:28:51] housing crisis. [1:28:53] So it's just wonderful to see [1:28:55] that public/private set of [1:28:55] initiatives. [1:28:56] And it's great when we can put [1:28:58] it to work on projects like [1:28:58] this. [1:28:59] >> raheem shepard: yes. [1:29:01] Glad to see that happening. [1:29:02] >> priscilla rojas: additional [1:29:05] questions or comments? [1:29:05] I -- yah. [1:29:09] Just to echo. [1:29:12] I mean, I get so, so excited [1:29:16] for as of right projects and to [1:29:18] really see all the hard work [1:29:21] that, you know, the planning [1:29:22] and then now to add the [1:29:23] development to that. [1:29:25] It's gratifying to see. [1:29:26] Really proud of the team and [1:29:27] happy to see the process [1:29:29] working. [1:29:31] the two and three bedrooms of [1:29:35] family oriented is exactly [1:29:37] what, you know, our [1:29:37] neighborhood, my [1:29:40] neighborhood -- I'm a mattapan [1:29:41] resident -- needs. [1:29:43] It's a real dream project, I [1:29:49] think, for me. [1:29:51] I'm just really... It's so [1:29:51] great to see. [1:29:56] It's so great to see investment [1:29:57] in the community, in our [1:29:58] community. [1:30:00] And an investment like this. [1:30:03] That is so needed and, you [1:30:05] know, I could just see like the [1:30:07] families in the area and the [1:30:08] little kids walking to the [1:30:09] schools and across the street [1:30:12] from my house. [1:30:14] Again, I'm just really, really [1:30:15] pleased to see all of the [1:30:17] cooperation and o see all of [1:30:19] the hard work that the agency [1:30:21] has done for many years to get [1:30:27] projects like these swiftly [1:30:28] through the rocess and to [1:30:33] serve our community. [1:30:34] So thank you. [1:30:36] With that motion is in order. [1:30:37] >> so moved. [1:30:38] >> second. [1:30:39] >> priscilla rojas: all those [1:30:40] in favor? [1:30:40] Opposed? [1:30:41] The ayes have it. [1:30:43] Thank you very much. [1:30:47] Congratulations and good luck. [1:30:48] All right. [1:30:50] Item 14. [1:30:51] Request authorization to issue [1:30:52] a coping determination waiving [1:30:54] further review pursuant to [1:30:57] article 80b-5.3d. [1:30:58] Large project review of the [1:31:00] zoning code for the proposed [1:31:02] construction of 165 residential [1:31:05] rental units including 22idp [1:31:07] units and 200 bicycle parking [1:31:15] spaces located at 45 townsend [1:31:16] street and issue of [1:31:17] certification of compliance [1:31:20] pursuant to section 80b-6 of [1:31:21] the code upon successful [1:31:23] completion of the article 80b [1:31:24] large project review process [1:31:29] and enter into an affordable [1:31:31] rental housing and restriction [1:31:32] and execute cooperation [1:31:33] agreement. [1:31:35] >> hello again. [1:31:37] The proposed project before you [1:31:41] is an article 80b large project [1:31:44] in roxbury. [1:31:45] Kensington investment company [1:31:47] kic proposes to rehabilitate [1:31:48] the existing structures at the [1:31:51] approximately 4.58 acre site. [1:31:54] The former location of the [1:31:56] jewish memorial hospital which [1:31:58] was mostly operated by radius [1:32:00] specialty hospital before [1:32:01] closure in 2014. [1:32:03] The buildings have been vacant [1:32:04] since closure. [1:32:06] Proponent seeks to convert them [1:32:09] into a multifamily dwelling use [1:32:12] including 165 residential units [1:32:14] served by 139 accessory parking [1:32:16] spaces with six ride share [1:32:18] spaces, 214 bicycle parking [1:32:19] spaces for both residents and [1:32:22] visitors, and residential [1:32:25] accessory support areas and [1:32:28] over 95,000 square feet of new [1:32:30] open space on the site. [1:32:31] The proposed project includes [1:32:34] the demolition of approximately [1:32:36] 8,000 square feet on the site [1:32:38] as well as addition of new [1:32:40] structural area totaling [1:32:41] approximately 24,000 square [1:32:41] feet. [1:32:43] The proposed project has been [1:32:44] intentionally developed in [1:32:45] compliance with the zoning for [1:32:45] the site. [1:32:47] A letter of ntent was [1:32:48] originally filed for the [1:32:53] project on MAY 5th of 2017. [1:32:54] the project notification form [1:32:56] was subsequently filed on JULY [1:32:59] 12th of 2017. [1:33:00] The most recent supplemental [1:33:03] filing of this project was [1:33:06] filed on JANUARY 30th of 2026. [1:33:08] And a public meeting was held [1:33:09] on MARCH 4th, 2026. [1:33:11] A joint public and iag meeting [1:33:14] was also held on JULY 23rd of [1:33:15] 2026 associated with the most [1:33:17] recent supplemental filing. [1:33:20] All meetings were circulated to [1:33:22] the department's roxbury list [1:33:23] serve. [1:33:25] And the project received wide [1:33:25] community support from [1:33:26] community members. [1:33:28] The project successfully [1:33:29] completed boston civic design [1:33:32] commission review on JULY 7th [1:33:34] of 2026. [1:33:34] There were more public and [1:33:37] implt ag meetings throughout [1:33:43] these nine years, but wanted to [1:33:44] talk about thei ag [1:33:44] meetings throughout these nine [1:33:45] years, but wanted to talk about [1:33:45] the signs. [1:33:47] I ill now turn over to jason [1:33:48] Mcdonald in reviewing the [1:33:52] project before the development [1:33:52] team presentation. [1:33:54] Thank you. [1:33:56] >> once again, I'm jason [1:33:58] Mcdonald the planner assigned [1:33:59] to the project. [1:34:00] I'll be brief on this one. [1:34:03] The proposed project is located [1:34:08] in the townsend street [1:34:09] community facility subdistrict [1:34:11] of the roxbury neighborhood [1:34:13] district with a portion of it [1:34:16] towards the eastern end located [1:34:18] within the 3f. [1:34:21] 4,000 substrict but none of the [1:34:22] proposed work will be within [1:34:24] portion of the site. [1:34:25] At various scales including [1:34:28] some multifamily buildings in [1:34:33] the nearby area. [1:34:36] As mentioned bfore, it is a [1:34:37] rehabilitation of unoccupied [1:34:39] medical facility into a new [1:34:41] multifamily residential [1:34:42] complex. [1:34:45] In the review process, the [1:34:49] project has -- is proposed at [1:34:51] zoning compliant right in both [1:34:53] the parcels including with [1:34:55] dimension regulation and the [1:34:55] proposed use. [1:35:00] So I will now pass over to the [1:35:00] development team to give the [1:35:07] full presentation. [1:35:07] >> thank you. [1:35:10] Good afternoon, MADAM Chair [1:35:12] rojas, members of the board. [1:35:14] My name is ted davis. [1:35:16] I'm the project manager for the [1:35:17] proposed project brought before [1:35:19] you today located at 45 [1:35:20] townsend street in rox burr [1:35:24] prip -- roxbury. [1:35:26] Back in 2017 was the original [1:35:31] project notification came in at [1:35:32] 322 units. [1:35:34] In 2019 it was brought down to [1:35:35] 300 units. [1:35:38] After an extensive article 80 [1:35:40] process of engagement with the [1:35:42] community, in 2021 we submitted [1:35:44] a supplemental iling for 199 [1:35:45] units. [1:35:46] Unfortunately when covid hit, [1:35:47] the financials no longer worked [1:35:49] on the project. [1:35:52] Back in 2025 we reached out to [1:35:55] the neighborhood and bpda and [1:35:57] re-engaged them in [1:35:58] conversation. [1:36:00] So again, it's a fully zoning [1:36:00] compliant project. [1:36:03] As you can see here, outlined [1:36:05] by the white dashed line is the [1:36:07] parcel surrounded by academy [1:36:08] homes to the west and [1:36:10] multifamily homes and single [1:36:11] family homes on all other [1:36:13] sides. [1:36:17] next slide, please. [1:36:21] Here's a video of the current [1:36:23] site as we make its way around. [1:36:25] We are maintaining most of it. [1:36:26] There's some additions that [1:36:30] will be off to the left side. [1:36:31] The old dorm building, there [1:36:32] will be a three-story addition [1:36:33] off of that. [1:36:38] The white building in the back [1:36:39] of the property, I guess view [1:36:40] north right now. [1:36:42] That's an old warehouse that [1:36:46] will be demolished. [1:36:48] As well as some ancillary [1:36:50] buildings that are not suitable [1:36:54] for residential occupancy. [1:36:58] Next slide, please. [1:36:59] These are photos of the [1:37:00] current site. [1:37:01] One thing we wanted to point [1:37:05] out as you can see, the urrent [1:37:07] way the buildings are oriented [1:37:09] with entrances, there's almost [1:37:10] no connection to townsend [1:37:11] street. [1:37:12] It's even fenced off along the [1:37:15] main front building at 45. [1:37:16] So it's almost -- there's [1:37:17] almost no interaction. [1:37:18] One of the big things we want [1:37:19] to do in the design is make [1:37:21] this building part of the [1:37:22] street, make this part of the [1:37:25] community. [1:37:30] Next slide, please. [1:37:31] Again, this shows more photos [1:37:36] of the front. [1:37:38] Again, you can see no real [1:37:39] dialogue. [1:37:43] It'll be all fenced off and [1:37:43] gated. [1:37:44] Hides itself from the [1:37:45] neighborhood. [1:37:49] Next slide, please. [1:37:51] Some context of some buildings [1:37:51] in the neighborhood. [1:37:55] An array of multi-family [1:37:57] buildings that we're surrounded [1:37:57] by. [1:37:59] next slide, please. [1:38:00] This gives an oversight of what [1:38:03] we're planning to do. [1:38:05] One of the things we're really [1:38:08] proud of is we're trying to [1:38:10] create what you would call an [1:38:12] oasis in the city. [1:38:14] There's an amazing viewpoint at [1:38:16] the top of the property almost [1:38:18] 70 feet above townsend street [1:38:21] with incredible views of the [1:38:21] city. [1:38:22] There's some urban wild. [1:38:24] So what we're trying to do is [1:38:25] give space for the tenants to [1:38:28] walk outside, take in the [1:38:30] sights and really escape from [1:38:31] the hustle and bustle without [1:38:32] having to leave the property. [1:38:36] Next slide, please. [1:38:39] This shows the drastic [1:38:41] elevation change across the [1:38:41] site. [1:38:43] It's 50 feat from townsend to [1:38:44] the highest point. [1:38:47] Six stories at townsend street [1:38:48] and then three stories at the [1:38:49] rear of the site. [1:38:52] Next slide, please. [1:38:54] This shows the updated [1:38:58] renderings of the project. [1:38:59] You see building a. [1:39:01] This is the main entrance to [1:39:12] the site with a constant -- [1:39:12] concierge. [1:39:13] Those doors, you can walk right [1:39:15] into your units from the [1:39:16] street. [1:39:18] Upper right is building b [1:39:20] currently the old dorm [1:39:20] building. [1:39:22] Kind of the same idea. [1:39:23] There's some front doors along [1:39:24] the front of the building that [1:39:27] face out to the street so [1:39:28] there's interaction draektly at [1:39:29] the street. [1:39:29] Theirectly at [1:39:30] the street. [1:39:32] The bottom left corner, that is [1:39:34] the publicly accessible parking [1:39:34] lot. [1:39:36] That's where the six ride share [1:39:36] vehicles will be. [1:39:40] They are not only for the [1:39:43] development but for the [1:39:43] community. [1:39:44] As well that's the entrance to [1:39:45] the community room. [1:39:46] We are offering a community [1:39:48] room that will be available to [1:39:50] the neighborhood organizations [1:39:52] to use whenever they need. [1:39:54] And then on the right-hand [1:39:56] side, the lore right-hand side [1:39:59] you see a pedestrian access [1:40:02] way. [1:40:08] One of the big things we heard [1:40:09] from the community was they [1:40:12] wanted pedestrian access from [1:40:13] there down to townsend. [1:40:15] That was supposed to connect. [1:40:16] When the hospital was put in [1:40:17] that separated the connection. [1:40:20] They did not want vehicle [1:40:23] access, because the higginston [1:40:24] school is right there. [1:40:26] So that was something we kept [1:40:31] in mind during this design. [1:40:33] Again, some more aerial photos [1:40:36] to see what we did. [1:40:41] On the ottom right-hand corner [1:40:42] the current slope of the [1:40:45] parking lot is 12%. [1:40:46] We're doing civil work to [1:40:48] flatten out the parking areas. [1:40:52] Not only are they safer, ut [1:40:53] creates a nice tiered approach. [1:40:55] We're adding a lot of trees to [1:41:00] break up the parking and really [1:41:02] hide it and create a [1:41:03] comfortable space. [1:41:07] Next slide, please. [1:41:09] Again, more photos from [1:41:10] townsend street. [1:41:12] The lower left-hand side shows [1:41:14] that main entrance in the front [1:41:16] lawn area for people to hang [1:41:16] out in. [1:41:18] And then on the right side, [1:41:24] we're calling the garden [1:41:24] access. [1:41:27] There's a staircase and [1:41:28] pedestrian area leading up to [1:41:32] the public community room just [1:41:33] surrounded by vegetation and [1:41:34] really creating a lot of green [1:41:39] space. [1:41:42] Again, more photos from [1:41:42] townsend street. [1:41:44] There is currently an existing [1:41:45] overhead walkway connecting the [1:41:47] two buildings. [1:41:49] We wanted to keep this because [1:41:51] this really helps with ada [1:41:52] accessibility around the site. [1:41:54] Given the severe grade changes, [1:41:56] it was really hard to maintain [1:41:56] accessibility. [1:41:58] And this allowed us to make the [1:42:00] highest point of the site which [1:42:02] really is an incredible piece [1:42:05] of landscape or piece of [1:42:07] property accessible to [1:42:08] handicapped residents. [1:42:10] So via this walkway, they'll be [1:42:11] able to get up to that highest [1:42:15] point. [1:42:19] Thank you. [1:42:19] Again, more photos. [1:42:22] The upper right-hand corner is [1:42:24] the new dorm addition. [1:42:29] This is situated over the [1:42:29] current parking lot. [1:42:31] We understand there's a lot of [1:42:32] parking on this site. [1:42:32] That was a huge concern for the [1:42:35] community. [1:42:37] So e did everything in our [1:42:38] power to maintain as much [1:42:39] parking as possible. [1:42:42] As well as the six ride share [1:42:43] vehicles. [1:42:48] So we're hoping with these -- [1:42:51] by being able to save the [1:42:52] parking, we would save as much [1:42:55] parking as we can we'll be able [1:42:57] to satisfy, restrict parking [1:42:57] demands there. [1:43:00] With that, we'll open up to [1:43:00] questions. [1:43:01] Thank you. [1:43:01] >> priscilla rojas: questions [1:43:05] or comments from the board? [1:43:09] >> raheem shepard: excuse me. [1:43:11] Again, I would love to see more [1:43:12] three bedrooms. [1:43:13] Personal preference of mine. [1:43:15] I just want to speak about the [1:43:15] construction. [1:43:17] Have you talked to any [1:43:18] construction managers or [1:43:18] anything? [1:43:19] Are you looking at anyone in [1:43:22] particular? [1:43:23] >> we have not spoken to any [1:43:25] construction managers at this [1:43:26] time. [1:43:28] I have spoken with the [1:43:28] carpenters union. [1:43:30] But ultimately we need this to [1:43:31] pencil in order for it to work. [1:43:34] So we are open to any qualified [1:43:35] contractors who are able to [1:43:36] bid. [1:43:38] Ideally we can work with local [1:43:39] communities. [1:43:42] We do plan to network with the [1:43:44] cummins school to provide jobs [1:43:47] for them both for construction [1:43:48] and ong-term maintenance. [1:43:50] But yeah, that first goal is [1:43:52] making sure it pencils. [1:43:54] >> raheem shepard: definitely a [1:43:55] contrast difference from the [1:43:57] beginning to now, just looking [1:43:59] with the parking. [1:44:02] 165 units, one-way street. [1:44:03] A lot. [1:44:04] It was a lot. [1:44:05] >> yeah. [1:44:06] >> raheem shepard: I know the [1:44:07] process that you guys went [1:44:07] through. [1:44:09] Public process, it seems like [1:44:11] as I looked at some of the [1:44:14] comments it went from a lot [1:44:17] opposed to more neutral but a [1:44:17] lot of support. [1:44:19] Because it seemed like you [1:44:21] worked well ith the community. [1:44:22] >> yeah. [1:44:25] When I picked this up in 2025, [1:44:26] I started at the feedback we [1:44:28] got from the iag. [1:44:30] You know, the iag wrote a nice [1:44:33] letter in follow-up to the 2021 [1:44:33] supplemental filing. [1:44:35] And so I went through that [1:44:37] direct feedback and I tried to [1:44:38] check off every single request [1:44:39] they had. [1:44:42] And we pretty much did. [1:44:44] >> raheem shepard: great job. [1:44:45] >> priscilla rojas: additional [1:44:47] questions or comments? [1:44:47] >> matt o'malley: thank you, [1:44:48] MADAM Chair. [1:44:49] Always appreciate adaptive [1:44:51] reuse especially in this [1:44:53] building which I know well. [1:44:54] Given the height, has there [1:44:57] been exploration about rooftop [1:44:57] solar? [1:44:58] >> we are. [1:45:00] It's very -- you know, we would [1:45:01] love to do green roofs, love to [1:45:02] do solar. [1:45:04] Again, it's coming down to [1:45:05] making the numbers work [1:45:08] financially. [1:45:09] I agree with you. [1:45:10] I think sustainability is [1:45:13] financially responsible. [1:45:14] And so I'm doing everything in [1:45:15] my power to look at the [1:45:17] incentives that are out there [1:45:18] and sees what we can get and [1:45:20] how to make it work. [1:45:23] >> matt o'malley: okay. [1:45:25] Given the earlier text zoning [1:45:27] amendment we passed we'll go to [1:45:28] the zoning commission, perhaps [1:45:30] we'll make you guys a test case [1:45:31] for that going forward. [1:45:32] We appreciate the exploration [1:45:33] and hope it pencils. [1:45:35] >> thank you. [1:45:35] >> priscilla rojas: additional [1:45:38] questions or comments? [1:45:40] hearing and seeing none, motion [1:45:41] is in order. [1:45:43] >> so moved. [1:45:43] >> second. [1:45:44] >> priscilla rojas: all those [1:45:45] in favor? [1:45:45] Opposed? [1:45:47] The ayes have it. [1:45:52] Motion passes. [1:45:55] Good luck. [1:45:56] Item 15. [1:45:57] Request authorization to issue [1:45:59] a certification of approval [1:46:01] pursuant to article 80e small [1:46:02] project review of the zoning [1:46:04] code for the proposed [1:46:05] construction of 35 [1:46:07] homeownership units, including [1:46:10] six iz units, 75 vehicular [1:46:12] parking spaces, and 42 bicycle [1:46:16] parking spaces located at 350 [1:46:17] west fourth street enter into [1:46:18] community benefits agreement in [1:46:19] connection with the proposed [1:46:22] project and take all related [1:46:23] actions. [1:46:23] Zoe? [1:46:27] >> my name is zoe duvall, the [1:46:30] project manager here to present [1:46:33] the proposed article 80e small [1:46:35] project located at 350 west [1:46:36] fourth street in south boston. [1:46:38] The project filed a small [1:46:40] project review application on [1:46:42] JANUARY 15th, 2026, and two [1:46:43] public meetings were held. [1:46:46] One on MAY 6th, 2026, and [1:46:48] another on JULY 13th, 2026, [1:46:50] which the public comment period [1:46:51] was voluntarily extend. [1:46:54] Both meetings were duly noticed [1:46:56] and distributed to the south [1:47:01] boston neighborhood zis -- [1:47:02] distribution list. [1:47:04] The project would create 35 new [1:47:05] homeownership units consisting [1:47:09] of a mix of one, two, and three [1:47:13] bedroom units six of which will [1:47:17] be affordable to 80% to [1:47:17] 100% [1:47:17] 100% [1:47:19] 100% ai. [1:47:22] The proposed building would be [1:47:23] located. [1:47:28] The proposed project would [1:47:29] include 75 total subgrade [1:47:33] parking spaces, 37 of which are [1:47:34] intended to be replacement [1:47:36] spaces for the existing condo [1:47:38] surface parks spaces. [1:47:40] The proposed project would also [1:47:41] include 42 long-term bike [1:47:43] parking spaces and open space. [1:47:44] The project is also subject to [1:47:47] the updated article 37 zoning [1:47:50] and s net zero carbon [1:47:52] compliant and is an [1:47:56] all-efficient electric [1:47:56] building. [1:47:58] I will now hand it over to my [1:48:00] colleague tyler to run you [1:48:00] through the planning context. [1:48:06] Thank you. [1:48:07] >> ood evening, MADAM Chair, [1:48:10] members of the board t. [1:48:12] My name is tyler torres and I [1:48:14] am one of the planners assigned [1:48:15] to this project. [1:48:18] The proposed project is located [1:48:21] in a south boston multifamily [1:48:22] residential subdistrict. [1:48:24] It seeks to expand the [1:48:25] multifamily housing use located [1:48:27] on this parcel by developing a [1:48:30] new housing set on the existing [1:48:31] parking lot associated with [1:48:34] bigelow school condominiums [1:48:34] building. [1:48:36] The site sits in a [1:48:37] predominantly residential [1:48:39] neighborhood that is served [1:48:42] well by transportation options [1:48:46] with easy access, mbta bus [1:48:48] routes, and then broadway [1:48:49] redline station as well as [1:48:50] three blue bike stations within [1:48:51] a quarter mile. [1:48:55] Next slide, please. [1:48:57] The proposed project does seek [1:48:59] zoning relief for minimum set [1:49:01] back requirements. [1:49:02] Staff recommend zoning relief [1:49:05] given the condition it would [1:49:05] ultimately deliver. [1:49:07] If the building were strictly [1:49:10] complying with the zoning [1:49:12] envelope, the result would be a [1:49:13] larger boxier structure. [1:49:16] As depicted in this [1:49:17] visualization here created by [1:49:19] staff. [1:49:21] The proposed setback [1:49:22] adjustments are what allow the [1:49:24] project to deliver improved [1:49:26] open space and a better final [1:49:27] building condition. [1:49:28] The project also seeks two [1:49:30] forms of zoning relief for [1:49:30] parking. [1:49:33] The first is for relief related [1:49:35] to compact spaces. [1:49:38] 75 total spaces, 50 of them or [1:49:41] 67% are proposed as compact [1:49:42] exceeding the south boston [1:49:46] zoning article's 50% cap. [1:49:48] This is largely a function of [1:49:51] site geometry and a constrained [1:49:52] footprint. [1:49:54] Secondly, the combined site [1:49:57] will provide 75 spaces for 82 [1:50:00] units at a 0.91 ratio. [1:50:03] The riginal space, the [1:50:05] original 47 spaces for the [1:50:06] condominiums are retained and [1:50:10] 28 space ifs for the 35 new [1:50:11] spaces will be added. [1:50:13] It's worth noting that the [1:50:15] existing condition is already [1:50:17] nonconforming under today's [1:50:24] zoning standards. [1:50:29] While btd's maximum parking [1:50:30] ratios don't govern this [1:50:33] article 80e project, they are [1:50:33] instructive. [1:50:36] As they target a max of 0.75 to [1:50:38] 1.0 parking spaces per unit. [1:50:42] The proposed 0.91 ratio sits [1:50:44] comfortably in the iddle range [1:50:45] of that guidance reflecting the [1:50:46] site's strong transit access [1:50:47] and consistency. [1:50:49] I would now turn over to my [1:50:53] colleague alexa penard from the [1:50:54] urban design who will walk [1:50:57] through the landscape and [1:50:59] public realm strategy in [1:51:01] greater detail. [1:51:02] >> good evening. [1:51:03] I'm the assistant deputy [1:51:04] director for design review and [1:51:08] I'm filling in for my [1:51:11] colleagues tonight. [1:51:12] The landscape design [1:51:15] contributes to the overall plan [1:51:17] through a combination of shared [1:51:19] outdoor amenity space. [1:51:21] The project provides a publicly [1:51:22] accessible landscaped open [1:51:24] space between teletwo with [1:51:28] residential buildings creating [1:51:31] a space with generous seating [1:51:32] and shade and urbanized [1:51:33] setting. [1:51:35] Along with the fourth street, [1:51:43] new street trees permeable [1:51:45] paving and new street trees [1:51:47] enhance pedestrian circulation, [1:51:48] improved safety, and contribute [1:51:52] to a more cohesive public [1:51:52] realm. [1:51:54] Next slide, please. [1:51:55] The proposed building offers [1:51:58] three stories of residential [1:52:00] use over two levels of parking [1:52:02] with parking concealed by the [1:52:03] grade change between west [1:52:06] fourth and silver street. [1:52:09] Ground floor include the lobby [1:52:11] and resident bike storage which [1:52:13] is accessible from the entry [1:52:13] walkway. [1:52:15] The residential units are on a [1:52:18] double loaded l-shaped [1:52:20] corridor, the masonry portion [1:52:21] of the building runs the full [1:52:23] depth of the site, mirroring [1:52:25] the bigelow school building, [1:52:28] and the fiber cement clad [1:52:31] portion along the street [1:52:32] creating two different volumes [1:52:34] facing west fourth and [1:52:35] harmonizing with the scale of [1:52:36] the neighborhood buildings. [1:52:38] I'll pass back to zoe. [1:52:39] >> all right. [1:52:40] Lastly, this project was [1:52:42] reviewed using the modernized [1:52:45] article 80 processes and public [1:52:46] engagement methods. [1:52:47] The project has also been [1:52:49] responsive to both planning [1:52:51] department and public feedback [1:52:54] resulting in a reduction in [1:52:57] height and massing a one-story [1:52:58] reduction s well as facade and [1:53:00] site design features. [1:53:01] This concludes is the [1:53:04] presentation for this item. [1:53:05] And we're here to answer any [1:53:06] questions you MAY have. [1:53:07] >> priscilla rojas: thank you. [1:53:08] Any questions or comments from [1:53:10] the board? [1:53:11] All right. [1:53:12] Hearing and seeing none, motion [1:53:13] is n order. [1:53:14] >> so moved. [1:53:14] >> second. [1:53:16] >> priscilla rojas: all those [1:53:19] if -- in favor? [1:53:20] Opposed? [1:53:21] The ayes have it. [1:53:23] Congratulations and good luck. [1:53:24] Item 16. [1:53:25] Request authorization to [1:53:26] determine nat the existing [1:53:27] affordable housing agreement [1:53:29] and enter into an affordable [1:53:31] rental housing agreement and [1:53:32] restriction in connection with [1:53:34] the construction of two idp [1:53:37] units located at 204 west [1:53:38] seventh street and take all [1:53:39] related actions. [1:53:39] Andy. [1:53:42] >> >> thank you, MADAM Chair [1:53:44] and members of the board. [1:53:47] I'm andy feldman housing policy [1:53:48] manager at the 345I yor's [1:53:49] office of housing. [1:53:50] tonightmayor's office [1:53:51] of housing. [1:53:54] Tonight I'm here to request [1:53:56] your vote on affordable rental [1:53:57] housing agreement and [1:53:58] restriction for he development [1:54:00] at 204 west seventh street in [1:54:01] south boston. [1:54:03] The development is building 14 [1:54:05] units, and the board previously [1:54:06] thorssed an affordable housing [1:54:08] agreement for two condominium [1:54:08] units. [1:54:10] Since beginning construction, [1:54:12] the proponent has decided to [1:54:13] change from homeownership to [1:54:14] rental. [1:54:15] Therefore the vote in front of [1:54:17] you tonight will allow the [1:54:19] agency to enter into the [1:54:20] housing agreement to dedicate [1:54:23] two rental units under [1:54:24] inclusion nar development [1:54:25] policy. [1:54:26] Happy to answer any questions [1:54:28] you MAY have. [1:54:29] >> priscilla rojas: any [1:54:32] questions or comments? [1:54:35] Seeing none, motion in order. [1:54:37] >> so moved. [1:54:37] >> second. [1:54:38] >> priscilla rojas: all those [1:54:38] in favor. [1:54:43] The ayes have it. [1:54:44] Item 17 request authorization [1:54:46] to amend conveyance documents, [1:54:47] a first amendment to [1:54:49] cooperation agreement and a [1:54:50] first amendment to affordable [1:54:51] housing agreement in connection [1:54:53] with the development of 50 [1:54:53] herald street. [1:54:56] >> I'm here to talk about the [1:54:58] amendment to the cooperation [1:54:59] agreement affordable housing [1:55:00] agreement and conveyance [1:55:01] documents for the previously [1:55:04] approved project at 50 herald [1:55:05] street in the south end. [1:55:07] The project part of pda number [1:55:13] 114 was originally approved in [1:55:15] 2018 and includes 313 units [1:55:17] with a mix of affordable and [1:55:18] market rate units with ground [1:55:20] floor retail. [1:55:22] In 2024 the proponent filed the [1:55:23] notice of project change which [1:55:26] was approved at the JANUARY [1:55:27] 2025 board. [1:55:29] Included 117 units of all [1:55:31] affordable housing, a mix of [1:55:33] rental and homeownership. [1:55:35] The number of units has not [1:55:36] changed since the previous [1:55:41] approval and the ground floor [1:55:42] retail space. [1:55:46] That blow [1:55:46] elow-grade space was used [1:55:49] for storage and not the retail [1:55:50] space itself. [1:55:51] An amendment to the cooperation [1:55:52] agreement for the project is [1:55:53] necessary to reflect the final [1:55:55] parameters of the proposed [1:55:56] project as well as the first [1:55:58] amendment to the 2019 [1:55:59] affordable housing agreement to [1:56:01] reflect the revised number of [1:56:04] affordable housing units in the [1:56:07] proposed project. [1:56:08] Bpda staff has determined that [1:56:11] the existing land disposition [1:56:12] agreement which relates to the [1:56:13] initial fully completed [1:56:15] improvements of the project [1:56:17] site for commercial uses should [1:56:18] supersede the amendment of [1:56:20] conveyance documents to reflect [1:56:23] theory vised proposed project. [1:56:25] While preserving certain right [1:56:27] of the bpda. [1:56:28] There are o other changes or [1:56:30] items proposed this evening and [1:56:31] no presentation for this iem. [1:56:32] >> priscilla rojas: any [1:56:33] questions or comments from the [1:56:33] board? [1:56:35] Hearing and seeing none, motion [1:56:36] is in order. [1:56:37] >> so moved. [1:56:38] >> second. [1:56:39] >> priscilla rojas: all in [1:56:39] favor? [1:56:39] Opposed? [1:56:41] The ayes have it. [1:56:42] Thanks, nick. [1:56:44] And item 18. [1:56:45] I need a motion to pay our [1:56:49] bills. [1:56:50] >> matt o'malley: I move that [1:56:54] we pay our bills. [1:56:54] [Laughter] [1:56:55] >> priscilla rojas: all those [1:56:56] in favor? [1:56:57] No, a motion is in order. [1:56:58] Did I do that? [1:56:59] You just did that. [1:57:00] Sorry. [1:57:02] For some reason I'm just [1:57:04] messing this one up. [1:57:06] All those in favor? [1:57:06] Opposed? [1:57:07] The ayes have it. [1:57:08] Please pay the bills. [1:57:13] And finally, item 19. [1:57:16] Director shen, the floor is [1:57:16] yours. [1:57:21] >> director shen: I want to [1:57:23] start by first formally [1:57:25] welcoming felicia jacques as [1:57:27] she begins her tenure on the [1:57:28] bpda board. [1:57:30] We jumped right into the agenda [1:57:31] without this formal welcome. [1:57:36] And I want to provide just an [1:57:37] introduction. [1:57:38] Felicia swearing in this [1:57:39] afternoon was ctually an [1:57:41] historic event, because she is [1:57:43] the first black woman to serve [1:57:45] on the bpda board. [1:57:48] In her role as the principal [1:57:49] and manager of maloney [1:57:51] development, she brings to the [1:57:52] board more than 20 years of [1:57:54] experience and knowledge in [1:57:57] development, zoning, entitles, [1:57:59] financing, and design. [1:58:01] You already have seen that many [1:58:03] of the staff and proponents [1:58:06] know felicia well. [1:58:07] Felicia has also been deeply [1:58:11] involved in the city of oston [1:58:14] serving as community [1:58:15] preservation committee and also [1:58:18] on the -- she served on [1:58:19] historic boston, the boston [1:58:22] landmarks commission, and she [1:58:24] has also been the former board [1:58:28] chair of citizens housing and [1:58:29] planning association otherwise [1:58:33] known as chapa. [1:58:35] Prior to her role as maloney [1:58:36] development, she was the [1:58:38] director of real estate [1:58:39] development for the northeast [1:58:41] region for the community [1:58:42] builders incorporated. [1:58:44] She's also a member of the [1:58:45] urban land institute and the [1:58:47] boston chamber of commerce. [1:58:50] We're delighted to have her [1:58:52] join the bpda board and look [1:58:53] forward to working alongside [1:58:57] her as she reviews with staff [1:58:59] and work with the board every [1:58:59] month. [1:59:02] So welcome, felicia. [1:59:05] >> felicia jacques: thank you [1:59:05] so much. [1:59:07] It's wonderful to be back. [1:59:08] We've worked together. [1:59:10] Looking forward to working with [1:59:11] everyone. [1:59:15] >> director shen: I'd like to [1:59:17] just highlight the approvals [1:59:21] that the board took this [1:59:21] evening. [1:59:23] There were four new development [1:59:25] projects totaling about just [1:59:28] under 400,000 square foot of [1:59:29] new development that will [1:59:32] represent in today's dollars [1:59:36] about $173 million worth of [1:59:36] investment. [1:59:39] These projects will deliver 329 [1:59:43] total new residential units of [1:59:44] which 137 of them will be [1:59:46] income restricted. [1:59:48] When constructed, these [1:59:50] projects will put approximately [1:59:51] 360 trade peoples to work and [1:59:54] create more than 180 indirect [1:59:57] jobs. [1:59:59] I want to highlight the biggest [2:00:01] project that the board approved [2:00:04] this evening, which is the 45 [2:00:05] townsend street n oxbury [2:00:07] which is an adaptive reuse of a [2:00:08] hospital. [2:00:11] I think this is a hospital to [2:00:13] resi conversion. [2:00:16] And as noted by the [2:00:20] presentation, it has had long [2:00:22] history that was changed [2:00:24] multiple times, actually [2:00:32] interrupted by the covid-19 [2:00:33] pandemic and the current [2:00:34] approved project is now fully [2:00:36] zoning compliant and will [2:00:38] deliver over 165 new homes in [2:00:38] roxbury. [2:00:40] I want to thank the proponent [2:00:42] for persevering and thank the [2:00:43] community members for working [2:00:44] with he developer and our [2:00:46] staff to make sure this project [2:00:48] will eventually come to [2:00:49] fruition. [2:00:54] The other item of note tonight [2:00:57] that we ae proved was the small [2:00:58] clean energy infrastructure [2:01:00] zoning which is another step [2:01:05] towards a clean energy future [2:01:10] by adopting zoning updates to [2:01:12] meet and facilitate permitting [2:01:13] the process for small clean [2:01:14] energy infrastructure projects. [2:01:16] This zoning is in compliance [2:01:19] with the massachusetts law and [2:01:20] establishes a consolidated [2:01:22] local permitting process in [2:01:24] line with the state law and [2:01:27] boston's own climate resiliency [2:01:29] goals in an effort to [2:01:30] accelerate the transition of [2:01:33] our energy sources in the [2:01:33] coming years. [2:01:35] This kind of infrastructure [2:01:38] includes solar panels, wind [2:01:40] turbines, battery energy [2:01:42] storage, and short energy [2:01:43] transmission lines. [2:01:46] And it will streamline the [2:01:50] process for approving these [2:01:51] types of infrastructure nd as [2:01:53] we see more of them being [2:01:54] proposed I want to thank again [2:01:56] our staff for working diligent [2:02:00] diligently to approve the [2:02:03] zoning update and actually [2:02:04] engaging the ommunity about [2:02:06] the importance of this kind of [2:02:07] development. [2:02:10] The zoning will now move [2:02:12] forward to the boston zoning [2:02:14] commission and in SEPTEMBER for [2:02:17] approval and then be put nto [2:02:21] effect as early as OCTOBER of [2:02:21] this year. [2:02:26] One other approval of note, of [2:02:27] course, is the vote to extend [2:02:30] the lease for mass robotics in [2:02:36] the marine industrial park. [2:02:37] Actually this will also not [2:02:40] only extend that lease but also [2:02:41] expand their footprint in the [2:02:42] city of boston. [2:02:45] Mass robotics is the largest [2:02:47] independent hub for robotics in [2:02:48] the world. [2:02:51] And they have been a tenant of [2:02:52] ours at 12 channel street for [2:02:54] the last ten years. [2:02:57] With this expansion they will [2:03:00] remain in boston until at least [2:03:00] 2036. [2:03:03] They, of course, have been [2:03:04] courted y other cities [2:03:05] including new york. [2:03:08] And so the fact they have [2:03:10] chosen to actually remain and [2:03:11] commit long-term to being in [2:03:16] the city of boston is a major [2:03:16] achievement. [2:03:20] This is -- mass robotics is a [2:03:21] world-renowned innovation and [2:03:22] tech company. [2:03:23] And for it to continue to [2:03:26] invest in our city and make [2:03:27] boston their home is a real [2:03:30] achievement. [2:03:33] And I want to thank, of course, [2:03:35] I know chair rojas you've [2:03:38] already thanked and made -- [2:03:39] appreciated the real estate [2:03:40] staff for all their [2:03:41] contributions that they make [2:03:43] and you know every month that [2:03:45] this board meets there is a lot [2:03:48] of work that the real estate [2:03:52] staff continue to put in to [2:03:55] maintain good not only the -- [2:04:00] continuing the good work of [2:04:02] maintaining tenancy in the park [2:04:05] but also making sure that we're [2:04:06] fiscally sound. [2:04:08] So that ends my report for this [2:04:08] month. [2:04:09] >> priscilla rojas: thank you, [2:04:09] again. [2:04:12] Thank you so much, director [2:04:12] shen. [2:04:13] And I know you definitely [2:04:15] should have opened it, but yes [2:04:17] thank you. [2:04:17] Welcome. [2:04:18] Welcome, felicia. [2:04:20] I've had the privilege to serve [2:04:23] on the cpa board under [2:04:24] felicia's leadership and you [2:04:26] know we're all overwhelmed and [2:04:27] overjoyed to hear that you're [2:04:30] joining us. [2:04:32] So welcome. [2:04:35] And it is meaningful to be the [2:04:36] first black woman sitting here [2:04:37] at this table. [2:04:42] Second latina, but the first to [2:04:46] hold the gavel. [2:04:47] It's important. [2:04:52] It's really exciting to kind of [2:04:53] see the city represented in [2:04:56] this board. [2:04:58] So with that wsh welcome. [2:04:59] And I need a motion to adjourn [2:05:00] the meeting. [2:05:02] >> motion to adjourn? [2:05:02] >> second. [2:05:04] >> priscilla rojas: those in [2:05:05] favor? [2:05:05] Opposed? [2:05:06] Ayes have it. [2:05:07] Motion passes.