[0:03] I pledge algiance to the flag of the United States of America and to the [0:08] republic for which it stands. One nation under God, indivisible with liberty and [0:14] justice for all. [0:18] Council member Watkins here. Council member Earl. Mayor Reinhardt here. Vice [0:25] Mayor Johanus here. Council member [0:30] Okay. Public comments. Okay. See any new business? Approve [0:36] change order number one, Compton Street Resurfacing Project. Catch. [0:40] » Thank you, Mayor Reinhardt. So, as outlined in the memo, we're asking [0:43] council to approve change order number one for the Compton Street resurfacing [0:47] project in the amount of $59,270. During curb removal, the contractor [0:53] discovered that the existing asphalt is significantly thinner than anticipated. [0:57] nor engineer Aman Marsh determined that the planned inch and a half overlay [1:01] would not provide enough structural support and could lead to premature [1:04] failure. Um, our engineer recommends adding a 2-in asphalt base layer beneath [1:09] the planned inch and a half surface layer. This increases the total contract [1:13] from $359,731 to $419,1 [1:19] with no additional contract days. Uh, staff recommends approval of the change [1:23] order to ensure the long-term durability of the road. We'll be happy to answer [1:27] any questions if you have them. And also a side note, I have reached out to MDOT. [1:31] Uh they will approve this. So it won't affect our grant. The grant dollars [1:35] coming in. Um so we have that approved. >> So [1:40] we have done curb. >> Yeah. You want to talk about the [1:44] progress you made so far? The south side of the road. All the curbs done on the [1:48] south side of the road. >> So So adding two does that affect the [1:53] the curb? What? Well, so that's the thing is if you if we don't go full [1:58] depth, there's going to be additional wedging because of where the grades we [2:01] had to set the curbs to get the water to flow because there wasn't proper water [2:05] drainage. If you go down there right now, we peeled the asphalt that was [2:08] overlaid over the old curbs and it's already it's like 3 to 4 in on top of [2:13] the old curbs that were there. So, the new car with putting the new curb in, [2:18] we're setting those so that they don't need to be overlaid [2:22] um and that the water will make it to the catch basins on the corners of the [2:27] streets. >> I guess what I'm trying to figure out is [2:31] are we leaving the existing base layer as or is that all the way coming out and [2:36] you're putting the new 2 in? So all the asphalt that's there, what we would do [2:41] is we would do a 3 and 1/2 in mill over the whole road. And then there's going [2:45] to be some spots that there asphalt's a little bit deeper because it's not [2:49] uniform. There's spots that where it's 2 in and there's spots where it's like [2:52] four to 5 in. Um so what we would do then is turn around and pulverize the [2:58] rest of the material that's there and use that material that's on site to [3:02] grade the road. So that when we put the new asphalt, the new three and a half [3:05] inches in that's what you're gonna have a uniform three and a half inches [3:09] across. >> I would make sure we burn already set up [3:13] curbs and then as folding over existing and running over the the curb. [3:18] » No, no, we won't be going over. [3:24] » I guess the question I have is there's usually a contingency factor in a lot of [3:28] these. Is this kind of eaten up into that? [3:34] We may not see budget impact. >> Yeah, we'll see a slight impact on [3:40] what's in the contingency because there's been other materials we've made. [3:43] » Okay. >> But yeah, I mean we're within [3:46] » Sorry. [3:50] Okay. And local roads has about 1.1 million in it. So it's not really a big [3:55] impact. >> Okay. [4:00] I just want to make sure because I thought they already started curve I [4:06] didn't want us to go back and do exactly what we did before and we'll go right [4:10] into >> no yeah we've been trying to avoid that [4:13] as we can kind of see the issue was going to come about and so the way the [4:18] curbs are set up now there won't be any water won't make it [4:24] So [4:29] » I'll make a motion approve change order number one. [4:34] » Second. >> All those in favor. [4:36] » All those opposed. Do I have another motion? [4:40] » Motion to adjurnn. >> I'll second it. [4:42] » All those in favor. >> All those opposed. All right.