[0:14] Yes, sir. [0:20] » It's 6:30. I'll call this meeting to [0:22] order. First up, pledge of [0:24] » Allegiance. [0:28] I pledge algiance to the flag of the [0:31] United States of America [clears throat] [0:32] and to the republic for which it stands. [0:36] One nation under God, indivisible with [0:39] liberty for all. [0:48] So, uh, Mayor V and Corbus are [0:52] unavailable tonight. Uh, so I'll be [0:54] running the meeting. Um, as comments, [0:58] uh, the steak feed, uh, had a great [1:00] turnout. Um, and, uh, [1:08] okay. And, uh, tomorrow night is the, [1:11] uh, national night out. Um, I believe we [1:14] got [1:17] still use some more. Uh, anyone wanting [1:20] to help out, please contact the police [1:22] department and [1:25] See everybody there? [1:32] » Uh, no comments. [1:36] » Yeah. Uh, hopefully everybody enjoyed [1:38] the steak feed. Hopefully everybody [1:39] comes out tomorrow night. Uh, Teresa, [1:42] thanks for all your library uh, [1:44] Wednesdays for my grandkids. They enjoy [1:48] that. Mark to your staff down the [1:50] riverwalk cutting brush along the [1:53] pathway. Looks really good. So [1:57] that's your pleasure. [2:01] » Well, just a couple things. Number one [2:03] is I have finally totally retired. [2:07] I turned in my keys and everything to [2:09] the DA's office on Friday. So, [2:13] » Officially done. So, um, [2:20] Cory says, "I am now retired. Don't even [2:23] think about going back." So, um, anyway, [2:28] um, [2:30] won't make national night out tomorrow [2:32] because I'm teaching reserve officer [2:34] training academy. So, but they've been [2:38] great in the past and I hope everybody [2:40] turns out it's a wonderful experience. [2:47] Next up is the consent calendar meeting [2:50] minutes for July 6, 2026. [3:01] » July 6th of 2026. [3:03] » Second. [3:05] All right. Second. Any discussion? [3:09] All those in favor? I. [3:11] » Any oppos? [3:15] Uh, next up is staff reports. [3:22] Um, [3:25] so only thing to add in my report, um, [3:28] you know, I did put in here that we'll [3:30] have some res revisions the city fire [3:32] code and, uh, we had to do a public [3:35] notice for that because it will be by [3:37] ordinance and the public notices, uh, [3:39] you know, Liz has already done those. So [3:42] you'll be seeing those at our September [3:43] 8th meeting, you know, highlighting [3:45] September 8th, a Tuesday because of the [3:48] holiday. So [3:50] um basically it and you'll get to see [3:53] them, you know, in the packet, but [3:54] basically it it um gives some of the [3:59] items which we have reserved in our code [4:00] back to the state fire marshall's [4:02] office. Since we have a resident state [4:04] fire marshal, it makes um that a lot [4:07] simple simpler, you know, and and [4:10] they're more than um willing to help out [4:13] our fire department, investigative [4:14] needs, all those kind of things. So, [4:16] pretty excited about that. [4:19] And that's all I have unless there's any [4:22] questions. [4:29] So, is our new finance. [4:32] So, uh, I'll actually give the report, [4:33] but I wanted to introduce Mike Mallerie [4:35] to the council members and the [4:37] committee. The department heads all [4:39] [clears throat] met him. Um, he's been [4:40] on board for weeks, [4:42] » Couple weeks. So, um, you [4:45] [clears throat] know, there's yours in [4:47] the finance uh, report they're mine, not [4:49] his, but next month that'll be that'll [4:53] be his problem. Okay. Um, on the finance [4:57] report, you know, there's two in here. [5:00] one is the uh unodudited [5:03] uh end of July uh report for fiscal year [5:06] 2627 we run like for two weeks a week um [5:11] a month 13 to close out previous fiscal [5:14] year stuff. So um [5:18] you know nothing [5:20] too abnormal there. you'll see that uh [5:24] Andrew's fund, you know, has a negative [5:27] beginning fund balance and uh well, [5:31] that's because we had some building [5:33] issues, but that building is being [5:35] caught up. So, though obviously that's [5:38] going to be this, you know, current [5:39] fiscal year, but uh we're okay with [5:42] that. I think the water fund um you know [5:45] had a better uh beginning fund balance [5:49] than we thought and sur fund a little [5:52] bit less but you know that kind of stuff [5:54] shakes out. Obviously the fire fund um [5:57] is in the uh red right now but that is [6:01] because we haven't made transfers from [6:02] the general fund or you know received [6:05] payment from the royal fire district. [6:06] Pretty simple stuff though. So that is [6:12] » [clears throat] [6:12] » Uh basically it and then you know the [6:15] starting year report not a whole lot of [6:17] expenses in there. Um you know [6:22] yeah [6:24] anyway that's what I've got [6:27] for this month. [6:37] So fire. [6:40] » Uh the only thing I'd like to add is [6:41] that we had we did have the steak feed [6:43] um this weekend and we did sell out of [6:46] all of our steak meals. So I believe [6:47] just over 825 I believe was the number [6:50] in total. Uh it was a great turnout. So [6:53] I want to thank all the sponsors that [6:54] came out and helped uh make that event [6:56] happen. That's a huge event for our [6:58] department. So I just want to thank [6:59] everybody that came out and had a great [7:00] time. Um other than that I can answer [7:03] any questions that you might have. [7:11] Thank you. Next up is uh planning. [7:19] I have nothing to add to my report. Let [7:22] me know if you have any questions. [7:38] Next up is public works. [7:43] » Thank you, council. Um, uh, something to [7:45] add to my report, uh, because a couple [7:47] things actually we just found out about [7:49] last week. And, uh, thank you, Haley, [7:51] for saving the thunder for me. But we [7:54] did get awarded our, uh, $250,000, [7:56] uh, small city a lotment grant for [7:58] paving fur. Uh, that is going to require [8:01] a substantial city commitment as well. [8:03] um we won't know really how much until [8:06] we get further uh into the pre-esign and [8:08] that activity won't begin until we get a [8:11] contract uh in hand [clears throat] from [8:14] ODOT which should be around October I [8:16] suspect. Um [8:19] the other thing to to add to is uh uh [8:22] there's a pre-construction meeting uh [8:24] tomorrow uh regarding the timber sale up [8:27] at Ring Creek. So, I don't I don't know [8:30] have any more details on their schedule [8:31] up there, but I know that, you know, [8:33] probably pretty soon uh after this [8:34] meeting, they're going to get working up [8:36] there. Uh with that, I'm happy to answer [8:38] your questions. [8:58] Next up is [9:05] I have nothing to add, but I'd be happy [9:06] to answer any questions you might have. [9:21] Any questions? [9:23] Thank you. All right. Next up is police. [9:30] » Nothing to add to my report. Uh just [9:32] want to plug uh National Night Out. Uh [9:35] just hope to see everybody there and if [9:36] anyone is uh feels inclined to come help [9:40] out. Uh we'd certainly appreciate that. [9:43] Otherwise, I'll be happy to answer any [9:45] questions that the council may have. [9:58] Last but not least, city recorder. [10:16] Anyone sign up for public participation? [10:22] Uh, no sir. [10:23] » Okay, [10:24] » Council [10:26] apologize. I didn't realize there's a [10:28] sign in process. May I have a moment? [10:35] » Step up to the microphone. Um, it's uh [10:38] we'll have three minutes [10:41] shorter than that. [10:42] » Okay. Uh, I want to introduce myself and [10:45] council. Thank you for just a couple of [10:46] minutes. My name is Tom Parker. I'm the [10:49] interim CEO at the hospital. As many of [10:52] you know, uh Jeff Lang um moved on to a [10:56] position in uh state of Minnesota, [10:58] actually where I was born. Um and uh uh [11:02] I retired from a career in u in hospital [11:06] uh administration back in January. Um [11:10] unfortunately or fortunately the uh [11:12] recruiting firm who is working on the [11:14] interim placement and I have had a [11:16] long-standing relationship over the [11:18] years and they called me and and now I [11:20] stand before you uh to introduce myself. [11:23] Um you have a gem of a hospital here. Um [11:28] it's just such a privilege to work [11:31] there. I have in my fourth week it's a a [11:34] fabulous team of people very committed. [11:37] They work well together. Uh my job here [11:40] over the next 6 to9 months is to keep [11:42] things going and hand off to your [11:44] permanent new CEO a well-running [11:47] organization. That won't be hard because [11:50] it is a very good organization and I'm [11:53] thoroughly enjoying getting to know the [11:55] staff there. Um and uh uh open to any uh [12:00] feedback that you may have about your [12:02] hospital that I can help you with. But [12:03] again, tonight was just an introduction [12:05] to you and the staff here. Excuse you. [12:10] Thank you. [12:24] Next up is agenda item number eight. Uh [12:28] award of the [12:31] funded by SDWR. [12:37] Thank you, council. And uh you guys [12:39] should all have received some [12:41] supplemental information at at meeting [12:43] time. Um sorry for all the the late [12:47] additional information, but this is just [12:48] an ongoing process. Uh we were working [12:50] on it well into last week. And I think [12:53] the easiest way to to take you through [12:55] this is maybe go to page three of that [12:58] packet. Uh the one that starts with [13:01] additional information for agenda item [13:03] 8. So, if you look up at the top uh [13:07] graph up there, you'll see uh WCC bid [13:11] cost. The West Coast contractors was the [13:14] soldier. We went over that last month uh [13:16] for this project. Um they bid on all [13:19] three schedules for this project and [13:21] their total came to uh a little over 3.7 [13:24] million which was um almost 1.2 2 [13:28] million over uh what we had budgeted the [13:32] budget that we had submitted to the [13:33] funding agency for construction period. [13:35] Um through negotiations with them and [13:39] slightly uh reducing the scope of work, [13:42] we got that total down uh to just under [13:45] $3 million for their contract. Um [13:49] the omitted was the one seismic valve at [13:52] the ordering tank. Uh we're still [13:54] putting one in at the Nolton tank. Um we [13:58] allowed for a change in method for [14:00] dredging the reservoir from uh from [14:03] pumped uh to clamshell dredging. Um we [14:07] extended the project completion uh for a [14:10] couple months and then we made [14:12] clarifications with them. Now these were [14:14] items that we intended to do. It was [14:16] just maybe not clear in the spec, not [14:19] clear to the contractor, but when we [14:21] asked for their their schedule of [14:22] values, it was clear that they had put [14:25] stuff in there that they they didn't [14:26] need to have in there. Um, so all of [14:29] that uh allowed them to reduce their [14:32] price to this uh 2.988295. [14:35] Um, now if you add in uh a couple of [14:38] other uh construction costs outside of [14:41] the West Coast work, we come up to just [14:42] over $3 million. Um so if you look at [14:46] the graph on the bottom um you can see [14:49] the the first column that's [14:53] the the amount and the budget items the [14:57] that each and of those categories that [14:58] were submitted to the funding agency. So [15:02] what we did to increase our construction [15:04] budget from 2.547 to 3.015 [15:09] uh first of all the engineers reduced [15:11] their fee by uh by $200,000. [15:14] um [15:16] small thing. Um and if you guys know how [15:19] these engineering budgets are built and [15:20] submitted, they're uh there's usually [15:24] like a formula for it. So you you take [15:26] your your full project amount and you [15:28] take about 14% set for design, 2% for [15:31] bidding, and 4% for construction [15:34] management, which brings you to 20%. [15:36] That was their 20%. Well, they were very [15:38] comfortable saying they could do this to [15:40] uh based on where they were after [15:42] design. um for 310,000 instead of [15:46] 509,000. So that we gained some money [15:49] there. Um [15:51] so uh the environmental review [15:54] um and uh and the permitting and [15:56] regulatory fees were reduced and that [16:00] that was when we discovered if we [16:02] weren't going to be discharging any [16:03] water overland uh we didn't need, you [16:05] know, a lot of the permits that we [16:07] thought we we might need. So that we [16:08] don't intend to spend any of that money. [16:11] Um, so we've preliminarily submitted [16:14] this to the funding agency, this revised [16:16] budget, and uh, one thing they let us [16:18] know was that contingency was still [16:21] going to have to be 10% of the [16:23] construction cost. So, uh, what we did [16:27] and and what is typical in these [16:29] projects, sometimes in these projects, [16:30] emergency owners put up the contingency [16:32] first off to maximize the use of the [16:35] available funding in the hopes that they [16:37] don't spend that contingency. So, our [16:39] budget still has $135,000 [16:42] of funded contingency. But what, you [16:45] know, we'll we will be committing the [16:48] city and the water fund to is up to an [16:50] additional $165,000 [16:52] of contingency, which I never hope to [16:55] spend, but I we're very comfortable with [16:57] this number considering that the um [17:00] contingency line in the 2627 water fund [17:03] is over $400,000. So, you know, we don't [17:07] want to spend that. We want to save [17:08] that, stockpile that, build our war [17:10] chest for other big capital [17:12] improvements. But um if we need to use [17:14] it for this one, uh we've told the [17:16] funding agency that we will. Uh [17:20] so what's next is um [17:26] and you can see the breakdown for the um [17:30] their schedule of values. Um if if [17:33] anyone's uh interested or or wants to [17:36] dig into that more, um [17:39] we're asking council tonight uh is to [17:43] first of all accept the sole responsive [17:45] bid uh received from West Coast [17:47] contractors uh and then to uh [17:52] uh motion to approve award of the [17:54] contract uh to West Coast contractors in [17:58] that stated amount pending funding [18:00] agency approval. approval of the revised [18:02] budget and uh project schedule. [18:06] So, happy to answer any questions you [18:08] have about the process. [18:10] Yes, Mark, I have a question. So, the [18:13] first first page, first thing that jumps [18:16] out at me is we got $3.491 [18:19] million [18:20] from the fund and we budgeted and you [18:25] said that we budgeted 2.5. [18:29] Can you explain that $900,000? Where's [18:32] that $900,000 difference? Where's that [18:34] going? That that is for engineering, uh, [18:37] labor standards compliance, um, [18:39] environmental review, federal [18:41] requirements, um, uh, legal fees, [18:44] permitting and regulatory fees. [18:46] » 2.5. [18:50] » Okay. So, we but we got 3.4 4 [18:55] and they came and their bid was 3.7. [19:00] Correct. [19:02] That's not 2.5. [19:05] Our budget includes the whole project [19:07] which is permitting, design, and [19:10] construction 1 2 3. [19:12] » So the construction budget is only a [19:14] fraction of the total budget. [19:17] » So a large a large fraction most of it. [19:20] But [19:21] » And the construction budget was what [19:23] mark 2.5 [19:26] » 2.547 was the original construction [19:28] budget. [19:29] » Okay. [19:49] You mentioned the Oring Heights tank. [19:52] Yes. [19:52] » The valve seismic valve. Is that valve [19:55] okay? That's my neighborhood where I [19:57] live. [19:58] » Is that at some point that'll get [20:01] replaced or [20:02] » Well, yeah, there's uh the only thing up [20:05] there now is an altitude valve that's [20:06] not used anymore. They they used to uh [20:08] run the system a little bit differently. [20:10] I think they found that um it it [20:12] basically is is almost the same [20:15] elevation as the Molton Heights tank. So [20:16] we just let the system uh fill it. And [20:20] the reason for the seismic valves is in [20:22] the event of a big a big seismic event [20:25] um you figure your lines are going to [20:26] start. You're going to have some line [20:27] breaks in there and the seismic valves [20:29] will immediately shut to retain whatever [20:31] water you have in that tank. So we will [20:34] still have the Nolton Heights storage. [20:35] we won't have the benefit of the of the [20:37] ordering storage. Now, um the other [20:41] thing is we we have to go clear across [20:43] town to feed the hoarding tank. So, if [20:45] there's a more valuable seismic valve to [20:47] have and tank to be using, of course, [20:49] it's the Nolton Heights tank. And [20:51] reality is, um you know, if lines start [20:54] breaking, it it's not going to be a [20:56] matter of, you know, we just turn on the [20:57] water again. But to fix a single line [21:01] from the treatment plant down to the [21:02] Milton Heights tank still gives us a big [21:04] storage area where, you know, residents, [21:07] you know, fire department, you know, [21:09] somebody can get have a spot to go fill [21:11] and we have a storage area um uh for, [21:15] you know, for some portable water. [21:17] » Okay. [21:17] » Yeah. Thank you. [21:27] to award the contract to the of the [21:30] construction of the city's water [21:31] reservoir. And I I don't I don't [21:38] page [21:43] to accept the the loan response bid uh [21:46] for the city of Pakil [21:49] um SWR LF water improvement project uh [21:53] received on June 17th, 2026 from West [21:56] Coast contractors in the amount of [22:00] I think lowered that amount Well, we're [22:03] now accepting a bid with this motion. [22:05] » Okay. Yeah, we're accept Yeah, we accept [22:08] that bid. Yeah. Yeah. [22:13] I'll second it. When you list the amount [22:16] in the motion or 3, [22:19] uh [22:21] 3,15,895, [22:23] right? That was the 3,723,000 [22:28] was the motion verbatim. But I thought I [22:31] thought the amount was that came in was [22:33] less than the [22:36] that was that was the original bid. [22:40] » So we have to accept the bid before we [22:42] can award the contract. Correct. Change [22:44] the amount with the higher [22:47] » Correct. Yeah. [22:48] » Okay. So we have to accept the 3.7 bid. [22:51] » Right. [22:52] » But we're not obligated to pay 3.7 when [22:55] we award the contract. [22:56] » We're not awarding the contract at that [22:57] amount. We're just accepting that the [22:59] bid was well responsive. [23:00] » Yes. [23:01] » Then the contract would be the second [23:03] motion which would be 2.9 million. [23:07] » Okay. Okay. So correct that. Uh [23:11] let me restart. Uh move to accept the [23:13] the response bid from the city of Cook [23:16] SDWR [23:18] water improvement project received June [23:20] 17th 2026 from West Coast contractors in [23:23] the amount of 3,723,000. [23:29] Second. [23:30] » All right. Motion made and seconded. Any [23:32] discussion? All those in favor? [23:38] » Hearing none. Motion carries. [23:41] All right. I'll move to award the [23:43] contract for the construction of the [23:44] city's water reservoir and tank uh [23:48] reconditioning and repair project to the [23:49] West Coast contractors in the amount of [23:52] 2,988,200 [23:56] uh 295 [23:59] pending funding agency approval. [24:01] » Second. [24:03] » All right. Motion made and seconded. Any [24:05] discussion on that? [24:07] All those in favor? I. Any opposed? [24:24] Next up is agenda item number nine. [24:27] Consider resolution 11-2026 [24:30] adding a new administrator for online [24:32] access and authorizing of the city bank [24:35] accounts. [24:40] standing procedure council. Um, Mr. [24:43] Mallalerie wants to be able to, you [24:45] know, have all this fun. So, this is the [24:48] correct resolution that we've used in [24:51] the past to uh give him proper access [24:54] and responsibility for our various [24:57] accounts. [24:59] I move we approve resolution number [25:01] 11-2026. [25:07] Second [25:09] motion made and seconded. Any [25:11] discussion? All those in favor? [25:13] » I [25:18] next agenda item 10, authorization to [25:21] reallocate funds. [25:23] So, uh, I did put on the DS evening, uh, [25:26] an additional item just to show council [25:29] that in fact, um, on the mortgage, which [25:32] is the real estate loan listed here for [25:34] city hall, that we're actually ahead on [25:37] our payments there, and we did budget a [25:39] payment this year, as we do every year, [25:42] but we're not actually have one due till [25:44] July of 2029. [25:46] So, uh, based on the, uh, [25:51] oh, the destruction of the charger, so [25:53] to speak, um, came became more imminent [25:56] than what we had planned. And as you all [26:00] probably know, um, no more chargers, [26:03] right? So, you know, the next thing is [26:06] then you have to get Durango. And, uh, [26:09] you know, chargers were relatively [26:11] inexpensive, I suppose. [26:14] um but you know just they're not [26:16] available. So with the combination of [26:19] the insurance money that we'll get for [26:20] the charger uh being totaled along with [26:23] $35,000 that we already had in equipment [26:26] reserves for a police car, we will still [26:28] need somewhere between 19 and $21,000. [26:34] So, what we're asking council to do is [26:35] to allow us to re allocate those funds [26:39] um to be spent on the Durango. [26:45] » We um Why do we have it budgeted if it [26:48] wasn't due until 2029? because we were [26:51] paying ahead, which is a good [26:52] » Okay [26:53] » Thing to do on mortgages, but [26:56] um it's nice to be ahead on something, [26:58] but yeah. [27:03] » Move we approve reallocation of up to [27:06] $21,000 [27:08] replacement vehicle for the police [27:10] department. Second [27:24] uh consider northwest natural easement [27:27] on GP lot number 10. [27:34] So, uh again, I think I can get us to [27:37] this pretty quickly. If you go to the [27:38] last page of this, uh agenda item, this [27:42] colorful diagram that I put together. Um [27:46] so what you're looking at there is uh [27:49] what is commonly known to us as GP lot [27:52] 10. Uh and that's the approximately 79 [27:55] acre parcel that is just to the south of [27:58] the ODOT office on Highway 42. [28:01] So, what Northwest intends to do is [28:04] reroute some of that gas line and [28:07] they're going to uh just continue along [28:09] the river right at about Ring Creek and [28:12] the and cut up through the Jacobson [28:13] property there where we access our river [28:15] pumps and then follow Highway 42 up to [28:19] their transfer station just south of ODO [28:21] up to GP lot 10. Um, [28:24] in order to get to their station, [28:26] however, they need to get around a uh a [28:29] wetlands area. [clears throat] uh that [28:30] you can see from this diagram. So the [28:32] yellow is approximately what they're [28:35] looking for for easement uh from the [28:37] city. Um so that's through uh partial [28:40] number 202. Uh partial number 203, which [28:44] is just to the south, is also owned by [28:45] the city, but is almost entirely [28:48] encumbered by a Northwest Nashville [28:50] easement for their transfer station. Um [28:52] so uh they they asked the city uh to [28:57] grant them this easement to run the [28:58] pipeline through 203 or 202 and um what [29:04] staff or I asked them uh was uh maybe in [29:08] lie of some payment for that would they [29:11] consider improving their access to on [29:14] the southwest portion of this station so [29:17] that could be used as the uh primary [29:19] access and the gain for us there is um [29:25] anyone if the city or you know anybody [29:27] we sell the property to wants to develop [29:29] that lot 202 in the future they don't [29:31] have to worry for you know lengths of [29:33] time about u the gas company trying to [29:36] get in there and I' I'd like to steer [29:38] them towards that that other access but [29:41] what that would involve for them is [29:42] installing a new gate um and putting [29:45] some fill and rock and and basically [29:47] improving that road uh and where that is [29:50] is right It's basically the blue part [29:52] there is what they'd have to improve. [29:54] The red part we've already improved um [29:57] and we we use that uh you know both for [30:00] maintenance access back there and our [30:02] Riverwalk users like to use it too as a [30:04] loop. Um the yellow valve in there I [30:07] marked was another thing I asked them [30:09] that that valve box was too low and we [30:11] haven't been able to fill that little [30:12] corner in there and uh they I actually [30:15] just saw a work order for them to come [30:16] out and do that. So, they intend to [30:17] raise that valve box up and they intend [30:20] to uh improve that access as well. Um, [30:24] they'd like to get going on this [30:26] project. However, they didn't have the [30:28] easements for me to bring to you to to [30:31] improve since this is for somebody [30:33] else's benefit, not the city's benefit. [30:35] It goes beyond staff level approval. [30:37] This easement and and goes to council. [30:40] um they said in of that they would like [30:43] us that would allow them to keep moving [30:44] on their project is to sign the letter [30:47] of intent uh included in this packet. Um [30:51] and uh they also included a workspace [30:54] agreement. I don't think I think that's [30:57] something that's probably within the [30:58] city manager's preview to agree. It's [31:00] just a temporary workspace agreement [31:02] around the pipeline, but I included in [31:04] here nonetheless for you guys to uh make [31:06] a motion on. Uh so I guess what we're [31:08] asking tonight is to uh authorize the [31:12] the signing of this letter of intent uh [31:15] to to grant the easement, you know, with [31:18] the the understanding uh here in written [31:21] in that um in that agreement that they [31:24] will be improving their access to the [31:26] southern southwest corner of the [31:28] station. Uh and when they have these [31:31] easements ready, which did they actually [31:34] send those over? [31:35] » We did. [31:35] » Okay. [31:37] Okay. Yeah. So, we we just we just got [31:40] those and then we'll be bringing those [31:43] uh you know to council, but uh at next [31:46] month's meeting, but this will allow [31:47] them to p uh p continue with their work [31:50] on schedule here. They're trying to get [31:52] this done pretty quick. Um [31:56] any questions you guys have about this? [32:04] Instead of buying the easement, they're [32:06] agreeing to improve that road and fix [32:09] that switch or whatever. [32:12] » I'm sorry. [32:13] » Instead of paying us money for the [32:15] easement, they're agreeing to improve [32:18] the road and then also do that extra [32:20] work, [32:21] » The access. Yeah, the Yeah, the road to [32:23] that access point and install the gate [32:25] and make that their primary access. Um, [32:28] and I should add that um, real market [32:31] value on this 24 2600 square ft uh, is [32:37] less than $2,000. And I think a standard [32:40] um, for easements like this is not a [32:42] very restrictive easement. I think we'll [32:44] be allowed to pave over it and put [32:45] concrete curb and things like that, new [32:47] buildings certainly um, which probably [32:50] wouldn't go in this area anyway. If you [32:52] see how this lot would be developed, [32:55] I think that those are typically, you [32:57] know, 75 down to 50%, usually in the 50% [33:01] level of real real market value uh for [33:04] that square footage, which would put it [33:06] at about $1,000. And uh I can promise [33:08] you I'll be doing more than $1,000 worth [33:10] of work on the access, but not not too [33:13] much more. You know, it doesn't involve [33:14] too much, but it will be put in a new [33:16] gate, uh bringing in some fill, bringing [33:18] in some rock. So it would be to the [33:20] benefit of the city to let them have [33:22] this easement. [33:23] » Yes, it will be. Yeah. [33:34] to approve the signing of a letter of [33:35] intent and temporary working space [33:37] agreement between the city of Kquil and [33:39] Northwest Natural Gas Company related to [33:41] the easements on uh 28s 13 uh W01 [33:49] DD 00220 [33:53] GP lot 10. [clears throat] [33:57] All right, move a seconded. Any [33:59] discussion? All those in favor? I [34:02] » I [34:04] carries [34:08] um for get of the order. Our next city [34:11] council meeting will be Tuesday, [34:14] September 8th, I believe, is Labor Day. [34:17] » Yes. [34:18] » Uh anything else go to the order. [34:25] » 7:04 I journ the regular meeting and at [34:29] 7:04 I will Let's [34:35] consent calendar meeting minutes for [34:37] July 6, 2026. [34:47] » I move we approve the consent calendar. [34:51] Second [34:53] motion made and seconded. Any [34:55] discussion? All those in favor? [35:01] » [snorts] [35:02] » Uh next up is consider request for UR. [35:09] Um [35:10] so the chief has you know tried to get [35:12] new written bids since the last um time [35:15] this item was considered and we just at [35:19] this point have the one. Nobody else is [35:22] you know [35:24] Mark has reached out uh he talked to a [35:26] gentleman and he said he was coming. [35:28] I've not seen him, but um had um Steve [35:32] Dazar also talked with a couple people [35:35] and they said, "Yep, yep, yep." And [35:37] nobody showed up. Um this is [35:42] uh Mike at Skuon or however you say [35:45] that. He did say that uh I know here we [35:48] said we get a contract, but he said, [35:50] "You know what? I'm going to wait till [35:51] the UR says go ahead." That way it's not [35:53] like, "Well, here's my contract waved in [35:55] front of you." So he said once there's [35:57] approval then he'll send a contract and [35:59] then we can sign everything. Um but like [36:01] he said he's going to keep it fair [36:02] throughout. If somebody else wants to [36:03] bid on it, bid on it. But this is 3 [36:06] months now we've had it open and we [36:08] still haven't got anybody committed to [36:10] come take a look. And I'm not sure why. [36:13] So [36:14] » What's his bid? [36:16] » What's that? [36:16] » How much? [36:17] » Uh his bid was just under 70,000. [36:20] » 65880. [36:21] » 65880. [36:25] So, where it gets a little different, [36:26] you know, um it's a 7in pad, 5,500 PSI, [36:31] so that's where the cost really goes up. [36:33] Um [36:35] the weight of the trucks are not getting [36:37] any lighter. So, that's why that [36:39] concrete expense is so high. [36:55] I'll make a motion uh [clears throat] [36:57] toward [36:59] the uh project to is it school own [37:07] is it award the contract or is it accept [37:10] the bid [37:11] » At this point it'll be accept the bid I [37:13] believe right you don't have a contract [37:15] in front of us [37:16] » Well so you all can accept the bid [37:19] tonight and close the bidding on this [37:21] project and then you'll have to you [37:24] approve the contract to award it and [37:25] that would be at the next uh UR meeting. [37:28] » Okay, [37:28] » Let's accept the bid. [37:30] » All right. Uh I move to accept the bid [37:33] from Scooon uh contracting uh for [37:39] » 65880 [37:41] » $65,880. [37:44] Second [37:46] motion in [37:50] All those in favor I [37:54] carries. [37:56] Uh, anything for the good of the order?