1 00:00:00,000 --> 00:00:27,530 Welcome to the City of Denton Planning and Zoning Commission meeting for January 10, 2018. This will be our work session. This meeting has been duly posted, and we do have a forum present, and I will call us to order at 502. Our first order business will be to receive clarification of agenda items. And so that will move us in our work session down to our consent agenda. If there are questions, 2 00:00:28,170 --> 00:00:31,390 Hayley can come and answer those on the consent agenda. 3 00:00:36,220 --> 00:00:37,880 The Denton Traffic Partners, 4 00:00:40,660 --> 00:00:41,000 okay. 5 00:00:41,540 --> 00:00:43,640 Hayley, you want to come up to the mic. 6 00:00:47,920 --> 00:00:48,540 Commissioner Beck. 7 00:00:49,020 --> 00:00:49,420 Thank you, Chair. 8 00:00:49,960 --> 00:00:51,100 Just a quick question. 9 00:00:52,120 --> 00:00:57,320 From the Google map thing, I'm sitting in the truck, there's a gas oil there now, so is that 10 00:00:57,320 --> 00:00:58,660 on that lot 8? 11 00:00:59,480 --> 00:00:59,920 Yes, sir. 12 00:01:00,000 --> 00:01:04,980 That is on lot 8 and there's an access easement and a pipeline easement, both coming off of 13 00:01:04,980 --> 00:01:05,760 Jim Crystal there. 14 00:01:06,040 --> 00:01:06,300 Okay. 15 00:01:06,300 --> 00:01:09,080 Is that remaining? They're not removing that? Are they just? 16 00:01:09,340 --> 00:01:14,760 It is to remain there's an approved gas wall site plan for that site, and as far as I know, it will remain there. 17 00:01:14,780 --> 00:01:16,000 Okay, thank you. 18 00:01:19,740 --> 00:01:22,220 Any other questions for Haley on this item? 19 00:01:26,560 --> 00:01:31,940 Okay. That will then take us to our items for individual consideration. 20 00:01:32,640 --> 00:01:39,020 And I'll call on Haley for presentation on P17-10 Creekside on Ryan Road. 21 00:01:40,180 --> 00:01:43,860 Yes, so some of you may be familiar with Creekside. 22 00:01:44,040 --> 00:01:48,040 It's a large parcel of on Annex property. 23 00:01:48,140 --> 00:01:52,000 It was under a non- Annexation agreement for several years, and when the last of those 24 00:01:52,000 --> 00:01:57,200 was about to expire in 2016, they entered into a pre- Annexation development agreement with 25 00:01:57,200 --> 00:02:00,820 the city, so it subdivided the entire parcel into three tracks of land. 26 00:02:01,520 --> 00:02:07,140 This is just one of those tracks that's tracked one C in the agreement, and it is for a single 27 00:02:07,140 --> 00:02:13,480 family subdivision that will have 137 residential lots and three common area lots. 28 00:02:15,160 --> 00:02:19,340 The plant has multiple pages here, but it would be, you know, your standard single family 29 00:02:19,340 --> 00:02:22,820 roughly in our three density is what we would be looking at here. 30 00:02:24,460 --> 00:02:28,760 And we did put this on individual consideration because there is a section in the agreement 31 00:02:28,760 --> 00:02:33,820 that requires the gas well onsite to be plugged before the final plant is approved. 32 00:02:33,820 --> 00:02:36,560 So we just wanted to be abundantly clear about that that 33 00:02:37,120 --> 00:02:41,680 That they will not get a final plot approved for this until such time as the gas well is plugged 34 00:02:41,680 --> 00:02:48,160 Okay, Commissioner back and on that note so those I guess those are storage tanks that are there now too 35 00:02:49,120 --> 00:02:53,180 They've all been removed at this point the operator is in the process already going. Yes 36 00:02:53,180 --> 00:02:55,000 Okay, they're in the process of closing the site 37 00:03:00,070 --> 00:03:02,450 Commissioner Sullivan sorry sir 38 00:03:11,170 --> 00:03:16,670 I know there was one done in 2014 for a subdivision further to the west from this property. 39 00:03:17,230 --> 00:03:20,550 I'm not sure if there's been anything done in the time since then, though. 40 00:03:21,770 --> 00:03:28,800 Also, how does the impact fee or whatever is called now? 41 00:03:29,340 --> 00:03:36,800 How has it assessed since, you know, on the street side of this subdivision is not 42 00:03:36,800 --> 00:03:40,420 nearly as big as the whole subdivision? 43 00:03:40,580 --> 00:03:46,980 How is it determined, who's going to take care of the street and when is that determined? 44 00:03:47,940 --> 00:03:51,700 My understanding is all that was laid out in the pre-annexation development agreement. 45 00:03:51,700 --> 00:03:56,060 there were agreed upon amounts for roadway impact fees and all of the impact 46 00:03:56,060 --> 00:03:59,200 fees that would be associated with the development at that time knowing the 47 00:03:59,200 --> 00:04:03,580 full scope of all three tracks that were intended to be developed. So all of 48 00:04:03,580 --> 00:04:05,400 that has been kind of predetermined at this point. 49 00:04:05,500 --> 00:04:11,880 Okay, when is that going to happen, though? I mean, is there a deadline by which I 50 00:04:11,880 --> 00:04:16,740 think it's $589,000 is going to be spent to widen or to do something with Ryan 51 00:04:16,740 --> 00:04:21,220 Road is not specified exactly what's going to happen. And so I'm just 52 00:04:21,220 --> 00:04:25,580 As curious when is that street improvement supposed to happen? 53 00:04:26,160 --> 00:04:27,860 I'm not sure when the improvements will happen. 54 00:04:28,000 --> 00:04:32,620 I know the impact fees will be assessed and paid at the time of permitting for the individual building permits. 55 00:04:33,320 --> 00:04:38,900 So it will be split over all of these individual lots as they're developed in terms of when it's paid. 56 00:04:39,340 --> 00:04:48,280 Because I know Ryan Meadows on the other end of the West End, there hasn't been anything done to the street that they front on Ryan Road. 57 00:04:48,280 --> 00:04:50,760 But they've been there for a year or more. 58 00:04:51,380 --> 00:04:55,640 I'm not aware of any immediate plans for improvements on Ryan Road, but the impact fees 59 00:04:55,640 --> 00:04:57,160 will be paid with each permit. 60 00:04:59,360 --> 00:05:03,720 Hey, you may want to give a clarification to Commissioner Sullivan that it's at the city's 61 00:05:03,720 --> 00:05:07,800 option whether the perimeter street paving's done or where they collect the fees. 62 00:05:08,540 --> 00:05:09,040 Yeah, yeah. 63 00:05:09,080 --> 00:05:14,580 In this case, the agreement outlined how much would be paid for each phase of this development 64 00:05:14,580 --> 00:05:21,320 for impact phase for road water and sewer so Commissioner Smith thank you 65 00:05:21,320 --> 00:05:24,680 chair clarification on the bottom of the plaque there it says street 66 00:05:24,680 --> 00:05:27,900 d just ends and they're in the map is that connecting to the neighborhood 67 00:05:27,900 --> 00:05:35,020 itself of that track exactly is happening there yeah see much I can't quite 68 00:05:35,020 --> 00:05:42,540 go further south creek view or creek day oh does it I'm sorry yeah it does tie 69 00:05:42,540 --> 00:05:46,900 the existing subdivision. I don't see the exact streak that you were referencing but it ties into 70 00:05:46,900 --> 00:05:51,040 the existing subdivision. So basically the most of my question is I was pretty. I was pretty 71 00:05:51,040 --> 00:05:59,440 able to pay attention. I looked at the next page. Does this plot eventually connect the neighborhood 72 00:05:59,440 --> 00:06:04,540 from Ryan all the way down to Hickory Creek or is there through the neighborhood or is the only way 73 00:06:04,540 --> 00:06:10,300 for people to get to Hickory Creek and then go back out to Teasley or go back out to 1830? It would 74 00:06:10,300 --> 00:06:12,100 to be connected through the name of our scheme. 75 00:06:12,520 --> 00:06:13,860 That was a question I had from my resident. 76 00:06:17,970 --> 00:06:20,510 The another thing that was brought up, 77 00:06:22,050 --> 00:06:26,170 permission of Sullivan talked about the traffic analysis. 78 00:06:27,090 --> 00:06:29,210 Can we get any information on that? 79 00:06:29,330 --> 00:06:30,930 There was one done in 2014 for this. 80 00:06:31,030 --> 00:06:34,930 Can we get a refresher on that during the actual meeting 81 00:06:34,930 --> 00:06:36,310 at 6.30 or? 82 00:06:36,690 --> 00:06:38,310 I could look into that to my knowledge. 83 00:06:38,510 --> 00:06:40,270 There hasn't been one done for this subdivision. 84 00:06:40,270 --> 00:06:44,030 And the one, I think, from 2014 was for another subdivision 85 00:06:44,030 --> 00:06:44,770 along Ryan Road. 86 00:06:44,830 --> 00:06:44,930 OK. 87 00:06:47,230 --> 00:06:50,510 The what say, what say does the city have 88 00:06:50,510 --> 00:06:53,430 and requiring the developer to put in acceleration 89 00:06:53,430 --> 00:06:57,330 and deceleration lanes coming into the neighborhood itself 90 00:06:57,330 --> 00:06:58,690 off of Ryan Road? 91 00:06:59,950 --> 00:07:02,570 Since the point time, or is there anything we could do 92 00:07:02,570 --> 00:07:02,930 is that? 93 00:07:03,610 --> 00:07:04,890 Honestly, I'm not certain on that. 94 00:07:05,290 --> 00:07:08,230 Since they did enter into the agreement that specified how much 95 00:07:08,230 --> 00:07:09,730 they would contribute towards the roadways, 96 00:07:09,730 --> 00:07:12,610 I don't know if there would be any room for that, but we could look into it. 97 00:07:12,730 --> 00:07:14,510 Okay. I was just bringing up concerns. 98 00:07:14,550 --> 00:07:18,870 I was brought to me about a couple of different citizens in the neighborhood that butts in. 99 00:07:19,390 --> 00:07:23,450 The last thing was within the preliminary planning process that we're in, 100 00:07:23,790 --> 00:07:28,190 what landscaping requirements are there currently? 101 00:07:28,770 --> 00:07:31,570 Is it zoned in R2? 102 00:07:32,550 --> 00:07:35,330 At this point, it's technically still in the city's ETJ. 103 00:07:35,970 --> 00:07:41,610 The agreement requires that once their final plan is approved, they apply for annexation into the city and then at that point 104 00:07:41,610 --> 00:07:46,650 It stipulates that they would apply for an NR3 zoning designation for the property 105 00:07:46,650 --> 00:07:51,810 In terms of landscaping the agreement outlined a very specific landscaping 106 00:07:52,510 --> 00:07:58,630 Plan for the entire subdivision as well as the other tracks the primary feature and this portion would be 107 00:07:59,250 --> 00:08:05,130 Let me get to the right page all of the trees that exist along the west side of the property or most of them are to remain 108 00:08:05,130 --> 00:08:07,650 in place and the same thing on the south side. 109 00:08:07,710 --> 00:08:09,150 Okay, that was the biggest questions I had there. 110 00:08:10,110 --> 00:08:13,810 And one other thing we brought up, what are the other, you said this is, this is track 111 00:08:13,810 --> 00:08:17,190 one C. What are the other tracks within this? 112 00:08:18,770 --> 00:08:19,770 It's kind of hard to see here. 113 00:08:19,850 --> 00:08:24,430 The one immediately joining it where all of the flood plain is, is one B, and the agreement 114 00:08:24,430 --> 00:08:29,550 specified that that would have up to three single family homes, but the majority of the 115 00:08:29,550 --> 00:08:31,690 ESA and the flood plain is all to remain intact. 116 00:08:31,690 --> 00:08:37,930 And then the other portion is further east from there and that would be kind of a second phase of the Good Samaritan Center. 117 00:08:38,390 --> 00:08:38,850 It works. 118 00:08:39,050 --> 00:08:39,530 Thank you. 119 00:08:44,900 --> 00:08:47,440 Any other questions for Hayley on this item? 120 00:08:50,250 --> 00:08:50,490 Okay. 121 00:08:51,090 --> 00:08:52,010 Thank you, Hayley. 122 00:08:53,850 --> 00:09:02,890 As far as our public hearings this evening, we'll need to get a, we'll open item A and 123 00:09:02,890 --> 00:09:10,210 Chair would like to get a motion from one of the other commissioners to continue this to the 21st, and we'll leave it open. 124 00:09:11,450 --> 00:09:17,150 And then the other two items, we're not going to take any action on those since they have been withdrawn. 125 00:09:18,270 --> 00:09:21,530 And that will take us through the items that are on our agenda. 126 00:09:21,870 --> 00:09:28,050 And I think Richard has got some other items that are off agenda that he wanted to go over with us here at work session. 127 00:09:28,050 --> 00:09:32,550 It just wanted to sort of update everybody what's kind of going to go on the next meeting. 128 00:09:32,910 --> 00:09:37,850 It's going to be a pretty hefty agenda, particularly for the work session. 129 00:09:38,010 --> 00:09:44,070 We'll have three items, specific for work session, two of those I handed out tonight. 130 00:09:44,870 --> 00:09:52,130 These are the new or draft design criteria manual for transportation and drainage. 131 00:09:52,790 --> 00:09:57,730 So I wanted to get those well in advance rather than just sending them that Friday before 132 00:09:57,730 --> 00:10:00,510 so everybody had a chance to take a look at it. 133 00:10:00,910 --> 00:10:04,450 They are online as well, so we can provide that in an email. 134 00:10:04,950 --> 00:10:08,450 They're on the city's website, if you wanted to look at them electronically. 135 00:10:09,510 --> 00:10:15,490 But in the transportation manual, you'll see quite a bit of changes from the existing, 136 00:10:15,490 --> 00:10:25,370 specifically with outlines, it's TIA changes to pavement standards, right away with. 137 00:10:26,210 --> 00:10:30,430 So I'll save all of the details for engineering taught estus. 138 00:10:30,930 --> 00:10:37,710 Director of Capital Improvements will be here as well as pre-tam to go over both of these. 139 00:10:37,710 --> 00:10:37,770 Yes. 140 00:10:39,510 --> 00:10:40,170 Commissioner Beck. 141 00:10:40,410 --> 00:10:40,890 Thank you, Chair. 142 00:10:41,150 --> 00:10:44,070 Well, let's affect the mobility plan in any way. 143 00:10:44,110 --> 00:10:47,410 Are we changing streets, directions, or anything like that? 144 00:10:49,230 --> 00:10:52,430 It'll actually widen some of the residential streets. 145 00:10:52,570 --> 00:10:52,710 Right. 146 00:10:53,190 --> 00:10:56,770 But not necessarily change the mobility plan. 147 00:10:57,550 --> 00:10:59,090 One thing you'll see in here, they're going, 148 00:10:59,370 --> 00:11:02,830 they're starting to go with context-sensitive corridors. 149 00:11:03,290 --> 00:11:05,090 So that will ultimately play into that. 150 00:11:05,090 --> 00:11:08,910 So there are sort of some given take. 151 00:11:09,830 --> 00:11:12,210 So if it's on a context sensitive corridor, 152 00:11:12,670 --> 00:11:17,970 there are some things that you can do to possibly reduce a park if you put a bike lane seat. 153 00:11:18,310 --> 00:11:23,070 So there's a number of different options sort of outlined in the manual. 154 00:11:23,750 --> 00:11:30,810 Okay, also as the only member here that's part of that subcommittee done with the DDC changes. 155 00:11:31,310 --> 00:11:33,050 Are we going to be holding any more meetings? 156 00:11:33,050 --> 00:11:42,410 Yes, or they actually implement because a new rewrite is supposed to be set up for the summer sometime. 157 00:11:43,010 --> 00:11:45,130 Even probably sooner than that. 158 00:11:45,770 --> 00:11:53,610 We're looking at getting sort of a first initial draft, possibly next month of some of the chapters. 159 00:11:54,390 --> 00:12:00,150 And so at that point in time, that subcommittee will then reconvene and start to go over those. 160 00:12:00,150 --> 00:12:06,510 and so what we suspect is probably March April sort of alternating work 161 00:12:06,510 --> 00:12:09,930 session and then the following meeting. We could probably plan on every work 162 00:12:09,930 --> 00:12:16,110 session having a sub-chapter or at least a section to review to get through 163 00:12:16,110 --> 00:12:20,850 that. So I just wanted to kind of preface that as we move forward that and not 164 00:12:20,850 --> 00:12:25,710 meant to carry it on in further just real quickly. Are they scheduled to have at 165 00:12:25,710 --> 00:12:30,510 It's one more public hearing on that before it goes to City Council. 166 00:12:31,010 --> 00:12:34,330 There'll be a cut on the criteria manual or the code. 167 00:12:34,850 --> 00:12:37,410 The code, so we'll have a number of public here. 168 00:12:37,590 --> 00:12:39,230 Okay, okay, right, thank you. 169 00:12:41,240 --> 00:12:46,680 The only other item that we'll get it to you prior to, I'll try to get that to you next week. 170 00:12:46,820 --> 00:12:49,180 Again, so you have it before the meeting. 171 00:12:50,260 --> 00:12:54,600 Debra Villares will be here to present changes to Subchapter 17, 172 00:12:54,600 --> 00:12:57,040 which deals with our environmentally sensitive areas. 173 00:12:57,580 --> 00:13:00,160 So there's some changes that she'd work through with her group. 174 00:13:01,540 --> 00:13:03,580 So we wanted to bring that to a work session as well. 175 00:13:05,240 --> 00:13:07,180 And then we have just to give you an idea. 176 00:13:07,440 --> 00:13:11,900 We have three rezoning and an SGP and then two preliminary plaats. 177 00:13:11,980 --> 00:13:16,160 So it's going to be, like I said, it'll be a bountiful agenda. 178 00:13:18,670 --> 00:13:24,370 What's the expected date for the adoption of the transportation criteria manual 179 00:13:24,370 --> 00:13:26,990 and the storm water and when those would go into effect. 180 00:13:27,530 --> 00:13:31,030 I think they're pushing to get them done sooner than later. 181 00:13:31,450 --> 00:13:35,150 They've opened up a sort of a 30 day window. 182 00:13:35,810 --> 00:13:41,650 And so what we talked about was rather than sort of have the meet, 183 00:13:41,810 --> 00:13:46,470 sort of let's just do it, let's open the window and then we can have that public hearing in between and 184 00:13:46,470 --> 00:13:50,830 that way if somebody from the public, I guess if they want to come, they could. 185 00:13:51,410 --> 00:13:56,670 So whether or not we want to open something up at the regular meeting, I mean, I guess that's an option that we can do. 186 00:13:56,850 --> 00:14:05,290 I don't know if, again, it's sort of up to, I'll leave that up to you guys how you want to handle that or just leave it as a work session item, okay? 187 00:14:12,530 --> 00:14:13,230 Commissioner Smith. 188 00:14:13,750 --> 00:14:18,130 Off the top of these, just for the public hearings, you probably may just find here. 189 00:14:18,390 --> 00:14:25,970 Do we need to make a motion to continue public hearing A and then B in season's there for items from the draw and we just, no action. 190 00:14:36,400 --> 00:14:47,020 I will call a conclusion to our work session at 517 and we will reconvene in council chambers at 630. 191 00:14:47,420 --> 00:14:48,220 Thank you. 192 00:14:54,300 --> 00:14:59,740 Good evening and welcome to the City of Denton Planning and Zoning Commission meeting for January 10, 2008. 193 00:15:00,860 --> 00:15:11,660 This meeting's been dilly posted, and we do have a quorum present, and I will call us to order at 630. Our first order of business will be to stand and give the pledge to the US and the Texas flag. 194 00:15:12,620 --> 00:15:13,280 of 195 00:15:19,360 --> 00:15:25,900 the United States of America, and to the Republic, for which it stands, one nation under 196 00:15:25,900 --> 00:15:29,800 God, indisputable with liberty and justice for all. 197 00:15:32,720 --> 00:15:41,460 Honour the Texas flag, a pledge allegiance to the Texas one state under God, one in indivisible. 198 00:15:48,420 --> 00:15:52,380 Before we get started this evening on the rest of our agenda, we'll make an announcement for 199 00:15:52,380 --> 00:15:59,740 For some of you who may be here, we have two items that are on our public hearing, items 200 00:15:59,740 --> 00:16:04,600 4B and 4C that are the Woodlands Project on McKinney Street. 201 00:16:05,980 --> 00:16:08,960 That item has been withdrawn from our meeting this evening. 202 00:16:09,120 --> 00:16:15,140 So if you're here for that item, or either of those two items, will that not be heard tonight 203 00:16:15,140 --> 00:16:19,580 and we do not have a date certain on that so I'll announce that before we get started on 204 00:16:19,580 --> 00:16:24,820 the rest of our meeting. With that announcement, we will now move on to our 205 00:16:24,820 --> 00:16:25,640 consent agenda. 206 00:16:28,280 --> 00:16:32,480 Chair would entertain a motion on the consent agenda. Commissioner 207 00:16:32,480 --> 00:16:38,720 Smith. Motion to approve. Commissioner Beck. Second. Okay. We have a first and a 208 00:16:38,720 --> 00:16:44,880 second for approval. Any discussion? Commissioner Sullivan. Not just that. Okay. 209 00:16:44,880 --> 00:16:51,620 I have a motion and a second for approval, and we will call for a vote on the board. 210 00:17:00,740 --> 00:17:03,000 Motion is going to carry five to zero. 211 00:17:03,880 --> 00:17:10,760 That will take us to our items for individual consideration, and I will call on Haley 212 00:17:10,760 --> 00:17:13,820 for presentation of item P17-0010. 213 00:17:23,250 --> 00:17:23,870 Good evening. 214 00:17:24,010 --> 00:17:28,410 This item is a preliminary plat for the Creekside subdivision located on the south side of Ryan 215 00:17:28,410 --> 00:17:28,670 Road. 216 00:17:28,670 --> 00:17:33,070 It's 137 residential lots and three common area lots. 217 00:17:33,730 --> 00:17:40,150 These are being developed in accordance with the terms of a pre-annexation development agreement that was passed in 2016 by the City Council. 218 00:17:41,450 --> 00:17:45,290 This is one of three phases for the entire Creek side development. 219 00:17:46,090 --> 00:17:55,890 And staff is recommending approval of this plan with the condition that the existing gas flow onsite be plugged in accordance with the terms of the pre-annexation development agreement. 220 00:17:55,890 --> 00:18:00,830 and that a final plat not be considered by the Planning and Zoning Commission until such time as the well is plugged. 221 00:18:04,100 --> 00:18:05,400 Can stand for any questions. 222 00:18:09,650 --> 00:18:10,090 Questions? 223 00:18:11,370 --> 00:18:11,490 No. 224 00:18:12,110 --> 00:18:12,830 Okay, great. 225 00:18:13,090 --> 00:18:13,510 Thank you, Haley. 226 00:18:14,850 --> 00:18:17,230 This is an item of individual consideration. 227 00:18:17,570 --> 00:18:19,670 I have a number of cards here to speak on this item. 228 00:18:20,130 --> 00:18:23,990 And I will start with the applicant, Thomas Fletcher. 229 00:18:29,770 --> 00:18:30,910 Do you give your name and address? 230 00:18:31,450 --> 00:18:32,450 Good evening, commissioners. 231 00:18:32,450 --> 00:18:39,950 Thomas Fletcher with Kindling Horn, 5750 Genesis Court, Frisco, Texas, 75034. 232 00:18:40,670 --> 00:18:43,490 Appreciate y'all's consideration to this item tonight. 233 00:18:44,110 --> 00:18:51,990 I realize there's a lot of citizens of Fistle Hill and maybe some of the surrounding neighborhoods 234 00:18:51,990 --> 00:18:55,570 that are in attendance tonight that have some questions and concerns. 235 00:18:55,890 --> 00:19:00,410 So what I'd like to do is kind of give an overview of the project and hopefully maybe that 236 00:19:00,410 --> 00:19:05,050 that will shed some light or maybe answer some of the questions that are had. 237 00:19:06,930 --> 00:19:13,070 If we can show the preliminary plat, so the preliminary plat, the portion that you're 238 00:19:13,070 --> 00:19:16,970 seeing on the screen here, this is the northern portion of the track. 239 00:19:17,410 --> 00:19:22,830 When we went through the PAD process, the PADA process with the city, one of the things we 240 00:19:22,830 --> 00:19:28,870 looked at is we wanted to do a development that really took advantage of the existing natural 241 00:19:28,870 --> 00:19:44,590 feature of the track. There's a lot of beautiful mature trees. So when we did the layout and the design and we were working with staff, we tried to keep the residential lots kind of towards the center portion of the track and create and keep the buffers that are on the perimeter. 242 00:19:44,590 --> 00:19:50,050 As you notice, there is a residential street running north south. 243 00:19:50,450 --> 00:19:53,650 We do not have lots that are backing to Thistle Hill. 244 00:19:53,910 --> 00:19:58,130 We have a landscape buffer there of the existing trees. 245 00:19:58,130 --> 00:20:01,970 It's approximately 120 feet wide on the north portion. 246 00:20:02,430 --> 00:20:06,010 As you go further south, I think it trims down to about 80 feet. 247 00:20:06,670 --> 00:20:13,430 Another thing when we were looking at this and we were doing the layout early on, we looked 248 00:20:13,430 --> 00:20:16,590 We looked at the Thistle Hill development, when Thistle Hill was developed, 249 00:20:17,270 --> 00:20:21,670 Thistle Ridge actually had a ride-of-way stub out to this track. 250 00:20:22,010 --> 00:20:26,930 When the development occurred, they did not build the roadway stub and 251 00:20:26,930 --> 00:20:32,810 the plans that set future ride-away for future extension to connect to the existing development. 252 00:20:33,270 --> 00:20:36,950 So as we worked with staff and we talked about the development and 253 00:20:36,950 --> 00:20:42,570 concerns that Thistle Hill might have with this connection to their development and 254 00:20:42,570 --> 00:20:44,810 and bringing additional traffic into their development. 255 00:20:45,290 --> 00:20:50,270 We looked at how do we meet the fire department or the fire code requirement of two access 256 00:20:50,270 --> 00:20:53,250 points in the distance between those access points. 257 00:20:53,770 --> 00:20:59,930 So this particular track has an 80 foot wide piece that runs south to Creekdale Drive. 258 00:21:00,490 --> 00:21:05,610 So for our two points of access, we have access to Creekdale and we have access to Ryan Road. 259 00:21:06,050 --> 00:21:10,650 So you will have some traffic split that will go between the two. 260 00:21:10,650 --> 00:21:14,830 So not all the traffic is going to be let out from the subdivision on to Ryan Road. 261 00:21:15,650 --> 00:21:21,870 Also as part of the agreement, because of the impact, because of what we were asking of the city. 262 00:21:22,550 --> 00:21:28,250 We are, we looked at Ryan Road, we talked about improvements to Ryan Road or 263 00:21:28,250 --> 00:21:33,650 our portion of contribution to the improvements or future improvements of Ryan Road. 264 00:21:33,650 --> 00:21:43,610 because there are concerns within the city about peace milling the roadway in doing these little scab on pieces adjacent to development. 265 00:21:44,210 --> 00:21:55,410 The decision was made with the city or by the city that the escrow of funds to assist with the future construction of Ryan Road was in the best interest of the city. 266 00:21:55,410 --> 00:22:05,290 The PADA stipulates that $589,000 will be donated by this development for perimeter roadway 267 00:22:05,290 --> 00:22:06,690 improvements to Ryan Road. 268 00:22:06,890 --> 00:22:13,590 That comes out to $4,300 per lot, which is more than twice what the roadway impact fee 269 00:22:13,590 --> 00:22:16,390 per lot is within the city's current ordinance. 270 00:22:16,990 --> 00:22:23,050 Along the south where we abut to Ryan Ranch, we've got a 70-foot buffer along there. 271 00:22:24,750 --> 00:22:28,030 So if you see this, this is the south portion of the track. 272 00:22:28,610 --> 00:22:29,130 I know it's not. 273 00:22:29,710 --> 00:22:31,890 It's a little bit hard to see on the screen. 274 00:22:32,390 --> 00:22:37,130 But you've got the north south road that kind of curves over and goes through the piece. 275 00:22:37,130 --> 00:22:40,990 It's kind of, I'd call it a flag lot, but there's 80 foot wide there. 276 00:22:41,470 --> 00:22:46,110 And that's going to have a residential street, which will be 27 feet back-to-back. 277 00:22:46,370 --> 00:22:50,950 There will be a sidewalk connecting the development down to Creekdale Drive. 278 00:22:50,950 --> 00:22:57,550 There's a 70-foot buffer between the proposed development and Ryan Ranch. 279 00:22:58,150 --> 00:23:04,070 All the majority of the mature trees within all of these open spaces are to be preserved. 280 00:23:05,270 --> 00:23:08,230 We've got trails throughout the development. 281 00:23:08,450 --> 00:23:15,230 We're taking advantage of the nice open spaces and putting in a mandering trail through the trees. 282 00:23:16,070 --> 00:23:21,930 to the east of the project adjacent to the floodplain in the actual creek. 283 00:23:21,930 --> 00:23:27,890 We're putting in a minute center with the children's playground and a swimming pool in the development. 284 00:23:28,110 --> 00:23:34,330 Like as Haley had mentioned, the development is contingent upon the well-being cap. 285 00:23:34,330 --> 00:23:36,430 There's an existing gas well on the site. 286 00:23:36,930 --> 00:23:39,750 As part of this development, that gas well is to be kept. 287 00:23:40,250 --> 00:23:41,870 That process has already begun. 288 00:23:41,870 --> 00:23:46,690 All the surface equipment has been removed, the surface has been cleaned up. 289 00:23:46,970 --> 00:23:51,210 Now we're waiting for the plug-in company, they're very busy at this time of the year. 290 00:23:51,430 --> 00:23:55,650 But we're on their schedule and we're waiting for the plug-in company to come up and 291 00:23:55,650 --> 00:23:59,570 cap the whale so that that should occur within the next few weeks. 292 00:24:00,250 --> 00:24:02,510 But anyway, that's kind of an overview. 293 00:24:02,890 --> 00:24:07,750 I tried to hit on transportation, the open space, the gas well. 294 00:24:07,750 --> 00:24:17,590 Well, I'll be happy to answer any questions and I'd be glad to come up afterwards if there's questions that are generated from the residents that I could potentially answer. 295 00:24:18,170 --> 00:24:20,330 Do you have a question? Commissioner Smith. 296 00:24:20,530 --> 00:24:20,990 Thank you, Commissioner. 297 00:24:21,390 --> 00:24:21,830 Thank you, Chair. 298 00:24:23,070 --> 00:24:28,590 Can you give me a rough estimate of property values for the development that's going in? 299 00:24:29,590 --> 00:24:31,130 Let me defer to the developer. 300 00:24:32,350 --> 00:24:34,630 Sure, let him introduce himself. 301 00:24:34,630 --> 00:24:38,530 I have a question for you, but I'll have a good one of the property values. 302 00:24:40,190 --> 00:24:45,050 Mr. Chairman and members of the Planning and Zoning Commission, I'm John Dickerson, 8333 Douglas, 303 00:24:45,470 --> 00:24:52,630 Sweet 1300 Dallas, Texas, I'm the President of Dickerson Development, and we are very excited to be your applicant. 304 00:24:52,630 --> 00:24:58,930 I actually own the property, we've closed on the property in November, so we're the owners of this 47-acre track, 305 00:24:58,930 --> 00:25:03,150 And we're very, very excited to be bringing this community into your city. 306 00:25:04,590 --> 00:25:08,710 We have two home builders lined up for this community and the price range of the homes that 307 00:25:08,710 --> 00:25:12,390 they've told us are $350,000 to $450,000. 308 00:25:13,790 --> 00:25:19,770 Okay, the two different home builders that are coming in, one of the questions I was raised 309 00:25:19,770 --> 00:25:25,010 by a citizen and brought to me was the worry of a cookie cutter facade being put up. 310 00:25:25,370 --> 00:25:27,390 Anything you could speak to that at all publicly? 311 00:25:27,390 --> 00:25:28,050 Certainly. 312 00:25:28,290 --> 00:25:28,570 Certainly. 313 00:25:28,730 --> 00:25:34,850 The PAD, the PADA, which was negotiated before we took over this property, addressed a lot 314 00:25:34,850 --> 00:25:42,010 of the issues of psych plans and setbacks to avoid the cooking hut or look that occurs 315 00:25:42,010 --> 00:25:49,210 in a lot of communities, you know, throughout the Metroplex and namely, we stagger front 316 00:25:49,210 --> 00:25:50,150 yard setbacks. 317 00:25:50,630 --> 00:25:56,470 There's basically three lots or three categories, A, B and C, two staggers so that there's 318 00:25:56,470 --> 00:25:59,010 not just a linear line of front yard set back. 319 00:25:59,810 --> 00:26:02,790 And then in our Homeowners Association, 320 00:26:03,190 --> 00:26:05,450 deed restrictions, we've got restrictions 321 00:26:05,450 --> 00:26:08,570 on front elevations, building materials, 322 00:26:08,930 --> 00:26:14,110 excuse me, masonry, brick, and I guess protections 323 00:26:14,110 --> 00:26:16,310 in there to make sure that it doesn't look 324 00:26:16,310 --> 00:26:19,870 like that there's not so many homes at the same time 325 00:26:19,870 --> 00:26:22,370 that there's different products. 326 00:26:22,650 --> 00:26:24,290 Did you guys drive through Fissa Hills at all 327 00:26:24,290 --> 00:26:29,350 to take ideas about how to create continuity within the area, keep the precisely looking 328 00:26:29,350 --> 00:26:33,550 the same as the wrong word to use, but something similar to what's already around it. 329 00:26:33,790 --> 00:26:41,690 I think this will hill is the standard or the quality of the quality that we envision happening 330 00:26:41,690 --> 00:26:42,450 on this property. 331 00:26:42,610 --> 00:26:43,430 Great, so absolutely. 332 00:26:43,890 --> 00:26:44,130 Thanks, sir. 333 00:26:44,410 --> 00:26:44,910 Yes, thank you. 334 00:26:45,390 --> 00:26:49,450 Did you guys ever have a neighborhood meeting with residents of this will hill to discuss 335 00:26:49,450 --> 00:26:49,770 this? 336 00:26:50,110 --> 00:26:50,810 No, we did not. 337 00:26:50,810 --> 00:26:56,530 All the meetings were with the city staff and the city officials. 338 00:26:57,010 --> 00:27:03,630 Usually brought up during zoning issues, not usually during our preliminary plating, but you could probably see this is a little bit more charged than normal preliminary plating plating. 339 00:27:04,250 --> 00:27:18,130 I think that was because the track is currently located in the ETJ, and then as part of the PADA, once the final plates are approved, we have to submit for annexation within 10 days. 340 00:27:18,130 --> 00:27:19,330 Thank you. 341 00:27:19,810 --> 00:27:20,590 Any other questions? 342 00:27:21,050 --> 00:27:22,110 Any other questions? 343 00:27:22,270 --> 00:27:22,910 Commissioner Sullivan. 344 00:27:23,510 --> 00:27:23,910 Thanks, Chair. 345 00:27:24,970 --> 00:27:28,530 I know it's all paid for the street impact fees or to be paid upfront. 346 00:27:29,150 --> 00:27:34,350 In fact, all three phases to combine are going to be $896,700. 347 00:27:35,130 --> 00:27:39,750 And my question is, since the traffic survey has not been done, how do you know what you're 348 00:27:39,750 --> 00:27:40,350 paying for? 349 00:27:40,950 --> 00:27:45,910 So when we met with the city, the city was in the process of doing their roadway impact 350 00:27:45,910 --> 00:27:46,310 fee. 351 00:27:47,010 --> 00:27:55,390 And what the city's consultant had determined was they had gone through and done a study of impacts on what a single family lot 352 00:27:55,390 --> 00:28:01,530 Impacts within a certain area of dent and what does that impact have on the roadway infrastructure in the system. 353 00:28:02,230 --> 00:28:10,210 And at the time I think at one point the city was looking at bringing forward a $3,000 per lot impact fee. 354 00:28:10,210 --> 00:28:18,710 And then as it went through the process that it was settled out on a $2,000 per lot impact fee. 355 00:28:18,910 --> 00:28:25,490 But what the study shows is that the actual impact is a little bit more significant than that. 356 00:28:25,810 --> 00:28:30,590 But if you make your roadway impact fee too high, then it could drive developers away. 357 00:28:30,910 --> 00:28:37,370 Because this project is located in the ETJ and we were asking for pre-annucation development agreement, 358 00:28:37,370 --> 00:28:47,790 That's why we came in at a roadway impact fee that is more in line with or appropriate to the impact of our development. 359 00:28:48,050 --> 00:28:57,870 So that figure was determined by the city and presented to us as part of the pre-annexation development agreement. 360 00:28:58,110 --> 00:29:05,770 So the study that was done by the city's consultant is what was utilized to help determine that appropriate fee amount. 361 00:29:05,770 --> 00:29:11,730 Well, I guess what I'm asking is, is that going to pay just to re-assault Ryan Rode, is it going to be? 362 00:29:11,890 --> 00:29:18,610 No, what it does is that covers, if we were to go out and do the perimeter roadway improvements, 363 00:29:19,110 --> 00:29:23,890 that fee is in line with the cost of that section of roadway. 364 00:29:24,710 --> 00:29:31,930 So, because if you go out and you drive, there are several areas adjacent to the Walmart, 365 00:29:31,930 --> 00:29:40,030 Mark Forest Hill, Teasley Trails, where with the development, the road was actually constructed and you get some incontinuity. 366 00:29:40,470 --> 00:29:59,950 So the city said, well, if we start assessing these impact fees versus having the developer themselves build this small section, or they're half of the roadway, then once we accumulate a certain amount of dollars, we can start the process of going out and doing schematic design, determination of road section. 367 00:30:04,500 --> 00:30:29,500 We can go through and do our flood study. So they can start using, so once these dollars are paid and put into the account, the city can start the process of planning for the improvements of this road, that planning will help them determine the overall, do an estimation of the overall cost, and then they can use that to start looking for sources to fund. Because you have, I mean, if you look at the, 368 00:30:29,500 --> 00:30:35,980 The area, I think about 60% of the front edge adjacent to Ryan Road is already developed. 369 00:30:36,500 --> 00:30:39,440 So you don't have as much development that's going to come in and contribute. 370 00:30:39,620 --> 00:30:44,060 So the city has to look at where are, what is the cost and 371 00:30:44,060 --> 00:30:48,580 then how can we fund the improvements to the overall roadway? 372 00:30:49,080 --> 00:30:50,400 You trust him more than I do. 373 00:30:51,900 --> 00:30:56,100 You only got to be adding at that, what, 137 homes? 374 00:30:56,100 --> 00:31:04,740 is 137 homes. My concern is that Thistle Hill phase one and two has about 150 homes and a couple of 375 00:31:04,740 --> 00:31:11,060 years ago there was a traffic survey done on Andrew because residents were concerned about the 376 00:31:11,060 --> 00:31:16,620 speeding of cars because it's a pretty straight shot from the back of Thistle Hill to Ryan Road. 377 00:31:17,300 --> 00:31:25,960 And during a five day period they had 2968 cars that went southbound from Ryan Road 378 00:31:26,100 --> 00:31:34,140 on to Andrew, another 3,173 cars that went northbound going from Andrew on to Ryan Road. 379 00:31:34,780 --> 00:31:40,860 So that's 6,141 cars that we're either going on to or off of Ryan Road. 380 00:31:41,990 --> 00:31:48,440 So that means that y'all's development is going to add an additional 6,000 cars going into 381 00:31:48,440 --> 00:31:51,820 or out of Ryan Road, but they're going to be traveling that Ryan Road. 382 00:31:52,540 --> 00:31:57,120 How do you all plan to get people out in a safe and 383 00:31:58,080 --> 00:32:01,920 expedited manner when you have all these cars coming within 384 00:32:02,560 --> 00:32:04,340 what, 300 feet of each other? 385 00:32:04,860 --> 00:32:08,100 From Andrew to Street A or whatever you call it? 386 00:32:08,160 --> 00:32:11,460 So the driveway spacing, when we look at the driveway spacing 387 00:32:11,460 --> 00:32:15,320 from Fistle Hill to our entry road, we look at the cities, 388 00:32:15,780 --> 00:32:17,840 the ultimate use of that roadway. 389 00:32:17,980 --> 00:32:19,780 What is the ultimate design section? 390 00:32:19,960 --> 00:32:20,800 What is the spacing? 391 00:32:20,800 --> 00:32:25,540 So if you look at Ryan Road and you drive up, there's a lot of, because it's developed 392 00:32:25,540 --> 00:32:29,560 over time, there's a lot of homes that front Ryan Road. 393 00:32:29,560 --> 00:32:37,740 So you have a lot of driveways with spacing that is relatively close when, you know, I think 394 00:32:37,740 --> 00:32:42,300 there's probably, you could probably find drives that are within, you know, 75 to 100 feet. 395 00:32:42,720 --> 00:32:45,660 Well, when we look at our development, we go through our design. 396 00:32:45,660 --> 00:33:03,500 We set our entry to where it is the distance apart from the entry to Thistle Hill meets the city's thoroughfare standards or traffic design standards so that there's adequate site distance, there's adequate visibility. 397 00:33:03,500 --> 00:33:09,060 So somebody that stopped in our development at Ryan Road, they have good sight and visibility. 398 00:33:09,640 --> 00:33:15,460 There's nothing impeding their visibility, and there's not going to be a car coming out of an adjacent driveway, 399 00:33:15,460 --> 00:33:22,660 whereas if they're coming out quickly, and we're coming, somebody in ours is coming out slowly, where it would create an issue. 400 00:33:23,040 --> 00:33:32,620 As far as the traffic count, I would imagine if those traffic count numbers, I would assume that those traffic count numbers probably included maybe traffic 401 00:33:32,620 --> 00:33:37,180 I think that was going through this little hill to get South to Creek Delta, maybe other developments. 402 00:33:37,840 --> 00:33:42,440 So from a traffic, I'm not a traffic engineer, but working with our traffic engineers. 403 00:33:43,100 --> 00:33:50,000 I know that a residential, single-family residential development typically generates about 9.5 trips per day. 404 00:33:50,420 --> 00:33:57,900 So if you round that up to 10, you're talking about 1,370 trips per day, that's generated from this development. 405 00:33:57,900 --> 00:34:04,180 In a peak hour, AM and PM, it's around one per lot. 406 00:34:04,340 --> 00:34:10,920 So you're talking about 137 peak hour trips that are added to the roadway system. 407 00:34:11,280 --> 00:34:16,420 Because the way our development is laid out, one of the things we did is, so we didn't 408 00:34:16,420 --> 00:34:24,860 have a straight through from Creekdale up to Ryan, we made it to where the, anyone coming 409 00:34:24,860 --> 00:34:29,600 or trying to go through the development would have to come down and go around. 410 00:34:29,780 --> 00:34:33,100 So we made several turns within the development that they would have to make. 411 00:34:33,380 --> 00:34:35,580 We didn't want to create a straight cut through. 412 00:34:36,260 --> 00:34:41,760 It, you know, studies have shown that if you make it harder for someone to cut through, you're going to reduce that cut through the traffic. 413 00:34:42,140 --> 00:34:47,380 So we didn't want to make this a development that's going to create an opportunity for a lot of cut through traffic. 414 00:34:47,780 --> 00:34:52,300 So I don't know if maybe their development has some cut through traffic in those numbers. 415 00:34:52,300 --> 00:34:59,820 But from a TIA standpoint, we would expect that 1,370 trips would be generated from this development per day. 416 00:35:00,080 --> 00:35:06,360 We would assume a certain percentage of those are going to go down to Creekdale and then go further south from there. 417 00:35:06,900 --> 00:35:16,360 What that percentage is without a TIA, I would probably guess that you might have 25% go south and 75% go north. 418 00:35:16,360 --> 00:35:23,300 just because the lots on the southern portion of the development, it's going to be quicker 419 00:35:23,300 --> 00:35:26,980 for them to get out if they go down to Creekdale and then I'm not sure there's another 420 00:35:27,480 --> 00:35:31,680 north-south connector street that goes out and I think comes out over by Sprouts. 421 00:35:31,680 --> 00:35:38,160 I'm not sure of all the street names, but that would be one way that the residents would 422 00:35:38,160 --> 00:35:40,300 get out and over to 2181. 423 00:35:40,300 --> 00:35:42,980 We're going to have to go Creekdale to River Pass, 424 00:35:43,440 --> 00:35:46,360 Hickory Creek, to then go on Hickory Creek, 425 00:35:46,360 --> 00:35:50,060 which is probably worse condition than Ryan Road. 426 00:35:50,720 --> 00:35:54,000 Let me ask you, have you, did you all talk to Ryan Ranch people, 427 00:35:55,120 --> 00:35:59,680 residents as far as dumping ever had many people into their neighborhood? 428 00:36:00,100 --> 00:36:02,880 We don't have any connectivity to their neighborhood. 429 00:36:03,220 --> 00:36:09,560 Well, Creekdale, I believe River Chase, if it's the correct street. 430 00:36:09,560 --> 00:36:10,500 Yeah, River Pass. 431 00:36:10,620 --> 00:36:13,040 River Pass is a collector and boundary of. 432 00:36:13,120 --> 00:36:18,440 So there's a north-south collector that ties into Creekdale that doesn't have any 433 00:36:18,440 --> 00:36:20,080 lots located on it. 434 00:36:20,200 --> 00:36:27,120 So Ryan Rant, it's my understanding if I'm not, if I'm thinking correctly, because I know 435 00:36:27,120 --> 00:36:32,100 when we looked at the sewer, because one of the things we looked at with the city is taking 436 00:36:32,680 --> 00:36:38,680 the Granada List station offline and making it gravity, which would save the city money with 437 00:36:38,680 --> 00:36:43,240 operation expense for that listation, one of the things we had to look at is there needed some 438 00:36:43,240 --> 00:36:50,520 up sizing of some of the sewer lines for their south in that I believe it's river pass, river chase. 439 00:36:51,800 --> 00:36:57,700 They mentioned that when we were talking about, they mentioned that if there was any up sizing required, 440 00:36:58,280 --> 00:37:03,900 they could potentially go that route because it's a collector and it did not impact any 441 00:37:03,900 --> 00:37:08,160 any lots or sewer line with services on it. 442 00:37:08,440 --> 00:37:12,220 But I'd have to look at a map to verify that, because I'm not. 443 00:37:12,620 --> 00:37:12,940 Okay. 444 00:37:13,620 --> 00:37:14,100 Thank you. 445 00:37:15,240 --> 00:37:17,540 It is River Pass, River Pass Drive. 446 00:37:18,040 --> 00:37:20,280 And are there lots running River Pass? 447 00:37:20,600 --> 00:37:21,320 They back to it. 448 00:37:21,440 --> 00:37:22,260 Back to it, thank you. 449 00:37:22,960 --> 00:37:24,900 On the east side, and the east side lots back to it, 450 00:37:24,900 --> 00:37:27,580 and the west of that is still farmland. 451 00:37:31,480 --> 00:37:32,940 Any other questions for the applicant? 452 00:37:36,400 --> 00:37:36,720 Thank you. 453 00:37:36,920 --> 00:37:37,200 Thank you. 454 00:37:38,480 --> 00:38:03,900 And this is a individual agenda item and so I do have several other cards I wish you to speak and just take these in the order in which they are presented I have a Richard Botto 3913 Maggie Meadow and it's not marked whether it's in support of opposition please come forward, give us your name and address and then the card I have to follow you be a car in a cathode. 455 00:38:03,900 --> 00:38:10,980 would. Yes, good evening. Thanks for the opportunity to speak to the board or to the commission. 456 00:38:12,260 --> 00:38:23,200 I am a member of Thistle Hills, Richard Boto 3913 Maggie's Meadow in Denton 76210. I am 457 00:38:23,200 --> 00:38:31,640 actually the president of our Thistle Hills phase one HOA newly formed about one year ago. 458 00:38:32,480 --> 00:38:42,540 And we do have some, we do have some concerns, I wouldn't call it complete opposition, but we have some concerns on the New Neighborhood. 459 00:38:43,620 --> 00:38:47,480 One, I guess I didn't get the question quickly and enough to the applicant. 460 00:38:49,240 --> 00:38:59,400 There's, I believe it was indicated that there's 120 to 80 feet wide buffer on the one side. 461 00:38:59,400 --> 00:39:07,920 And presently, there's multiple trees that are tagged with yellow ribbons, but there's 462 00:39:07,920 --> 00:39:13,360 a whole lot of foliage in that area as well that are major trees that are not. 463 00:39:13,920 --> 00:39:19,760 And I guess, like the first of all, ask the question of if we can get an understanding 464 00:39:19,760 --> 00:39:25,480 if just the ones that are tagged yellow at the moment are planned to be saved or more than 465 00:39:25,480 --> 00:39:27,360 just that in that area. 466 00:39:27,360 --> 00:39:31,060 Okay. Can I ask you do you have several questions for the applicant or just one? 467 00:39:32,660 --> 00:39:38,720 Probably the rest are more for the city. Okay. Ask the applicant to please come forward and let's address the 468 00:39:42,440 --> 00:39:50,300 As far as the tree tags we have not done any tagging to signify what's being removed versus what's being saved 469 00:39:50,300 --> 00:39:52,120 So when we go out and do our tree survey 470 00:39:52,860 --> 00:39:59,040 When they tag certain trees typically that's gonna the city of ditten has different classifications for trees 471 00:39:59,500 --> 00:40:06,660 So the trees that have the ribbon would meet a certain classification, but what we do is we go out and we tag. 472 00:40:07,160 --> 00:40:16,780 We'll tag and tie all the trees that are six inches or larger than we go through and put together a tree survey. 473 00:40:16,980 --> 00:40:27,740 When we did our development, our design, that buffer, the distance we set the buffer enabled us to look at minimal impacts to the tree. 474 00:40:27,740 --> 00:40:33,420 So, there's very minimal, there are some trees that are being removed, but within that primary 475 00:40:33,420 --> 00:40:38,940 120 feet width, the majority of those trees are being preserved. 476 00:40:40,220 --> 00:40:44,680 As far as when we have to go out and do some grading right up by the right of way, typically 477 00:40:44,680 --> 00:40:51,520 if there's a tree within 10 to 15 foot of the right of way, the grading activity is going 478 00:40:51,520 --> 00:40:55,520 that usually damage the tree to where it wouldn't survive. 479 00:40:55,940 --> 00:41:02,440 So any tree within probably 110 feet of that back property line would be preserved 480 00:41:02,440 --> 00:41:07,980 and then that 10 and then 50 foot right away, those were where you would start seeing tree removal. 481 00:41:08,660 --> 00:41:13,300 And then we're doing a trail through the trees and basically what we do on the design 482 00:41:13,300 --> 00:41:17,700 for the trail through the trees is it's kind of a design build trail so that we can kind 483 00:41:17,700 --> 00:41:23,360 We kind of go through and weave through the trees, and so that we're not removing trees to add concrete walk. 484 00:41:23,620 --> 00:41:31,160 We're building a concrete walk within the trees so that the citizens can enjoy the trees within the area. 485 00:41:32,040 --> 00:41:33,560 Does that answer your question? 486 00:41:33,720 --> 00:41:33,980 It does. 487 00:41:34,160 --> 00:41:34,360 Okay. 488 00:41:34,680 --> 00:41:36,380 I have a follow up while you're there at the mic. 489 00:41:36,920 --> 00:41:38,000 Have you already done your tree survey? 490 00:41:38,380 --> 00:41:38,880 We have. 491 00:41:39,040 --> 00:41:40,240 We have done the tree survey. 492 00:41:40,480 --> 00:41:43,660 It's been submitted to the city for review. 493 00:41:43,660 --> 00:41:48,920 We've done our grading plans, our construction plans are under review through the city. 494 00:41:50,640 --> 00:41:58,460 So I'd have to go back and relook at the numbers, but if we looked at the overall track and we looked at the percentage of canopy and 495 00:41:58,460 --> 00:42:05,600 caliper inches that we're saving, I think we're saving about 65% of the caliper inches on the site. 496 00:42:05,600 --> 00:42:19,420 the city. The city has two different standards. They have canopy trees and then they have trees that are kind of individual trees, but as far as canopy goes, the requirement is preserving 20%. 497 00:42:19,420 --> 00:42:28,940 I believe I know that there was some, I know a lot of the standards have been reviewed and there's changes that are maybe being proposed. 498 00:42:28,940 --> 00:42:35,240 But the last time I looked, I don't want to, if something's been updated or changed then I may not be speaking to what's current. 499 00:42:35,820 --> 00:42:46,040 But if based on what's current, we're saving about 45, probably around 45% over and above what would typically be required. 500 00:42:47,040 --> 00:42:53,300 So it's a very conservative approach, a very preservation oriented approach to the trees. 501 00:42:53,900 --> 00:42:58,420 I figured it was. I'm going to give you the opportunity to address that. So, thank you for answering my question. 502 00:42:58,700 --> 00:43:01,240 Please, may I ask them one of the different questions? 503 00:43:01,280 --> 00:43:07,160 Sure. Okay. With the developments. 504 00:43:07,640 --> 00:43:08,820 Can you step closer to the mic? 505 00:43:08,900 --> 00:43:10,500 Let me make sure and get it on the recording. 506 00:43:10,680 --> 00:43:18,800 So, with the development against Ryan Road, can you help us understand what type of, 507 00:43:21,680 --> 00:43:22,900 if you're 508 00:43:22,900 --> 00:43:27,660 of the development to Ryan Road and the construction of that wall? 509 00:43:28,120 --> 00:43:29,020 Yeah, absolutely. 510 00:43:29,380 --> 00:43:31,460 We are going to have a screening wall. 511 00:43:31,720 --> 00:43:37,220 So one of the other things we did is if you notice on the connection to Ryan Road, a 512 00:43:37,220 --> 00:43:40,360 lot of developments will typically back lots to Ryan Road. 513 00:43:40,520 --> 00:43:43,520 We wanted ours to be kind of set back and create a buffer. 514 00:43:44,020 --> 00:43:49,360 So not only do we have the 120 foot buffer along our western edge, we've carried that through 515 00:43:49,360 --> 00:43:50,440 across Ryan. 516 00:43:51,180 --> 00:43:56,880 We are, as part of our requirements, we're going to have a masonry screen wall across 517 00:43:57,440 --> 00:43:58,180 Ryan Road. 518 00:43:59,700 --> 00:44:03,060 And then we also have an entry feature that's going to look. 519 00:44:04,460 --> 00:44:07,040 John could probably describe it better than I can. 520 00:44:07,260 --> 00:44:16,000 But it's going to be an entry monument that has a bridge type fill. 521 00:44:16,000 --> 00:44:20,800 as if you were going across a covered bridge and into a 522 00:44:20,800 --> 00:44:24,580 ventilation there. I know you had a word for an 523 00:44:24,580 --> 00:44:29,440 Appalachian style entry feature and so it'll be a 524 00:44:29,440 --> 00:44:33,580 real nice entry way. We've got a divided median for 525 00:44:33,580 --> 00:44:36,460 the street that's connecting to Ryan Road so that 526 00:44:36,460 --> 00:44:40,700 divided median will have landscaping in it so the 527 00:44:40,700 --> 00:44:43,200 amenity center will sit right in here so as you're 528 00:44:43,200 --> 00:44:47,320 going westbound on Ryan Road and you look down in through the creek and all 529 00:44:47,320 --> 00:44:50,700 you'll be able to see the amenity center, the children's playground and the 530 00:44:50,700 --> 00:44:56,800 swimming pool. As you turn into street A we've got an HOA lot so when you turn in 531 00:44:56,800 --> 00:44:59,960 you're not gonna you're not gonna see homes right away. 532 00:45:00,000 --> 00:45:26,680 We have a masonry screen wall along there as well that kind of protects those first row of homes, so that the headlights aren't shining into homes or backyards or anything. So, we've got real nice landscaping, hardscaping design for this entry. So, there's quite a bit of beautification that's going on right there at Ryan Road. Thank you. Thank you. Please continue. 533 00:45:26,680 --> 00:45:26,800 Thank you. 534 00:45:27,240 --> 00:45:27,440 Okay. 535 00:45:27,860 --> 00:45:38,960 The next question that I had is, with the addition of Creekside now, in addition to 536 00:45:38,960 --> 00:45:45,640 Teasley Trails, Forest Meadows, Ryan Meadows, so now we'll have basically four new developments 537 00:45:45,960 --> 00:45:46,780 coming in there. 538 00:45:47,520 --> 00:45:56,180 There was a traffic impact study for Ryan Road, I believe, done in 2014, and the first question 539 00:45:56,180 --> 00:46:05,920 is there, what is the plan to have another study done, now that all these four new neighborhoods 540 00:46:05,920 --> 00:46:11,640 are coming in, and this study was done before any of them have basically been in it all. 541 00:46:12,260 --> 00:46:12,460 Okay. 542 00:46:12,980 --> 00:46:18,920 That'd be something to have to ask staff to speak to, and Haley, or Richard, who would like 543 00:46:18,920 --> 00:46:19,480 to take that? 544 00:46:24,790 --> 00:46:29,770 At this time, there are no immediate plans for any traffic study that I'm aware of, but as 545 00:46:29,770 --> 00:46:44,290 As he mentioned with the impact fees being collected for each of the new subdivisions, the city will ask for that money and have it available when the plans are made for Ryan Road to be fully improved to its full right of way with I think Commissioner back as a follow up question for you. 546 00:46:45,110 --> 00:46:50,350 Thank you chair. Hey, nobody's talking about it, but you can correct me if I'm wrong. 547 00:46:50,950 --> 00:46:57,450 isn't on our mobility plan, isn't Ryan Road schedule to become either a main 548 00:46:57,450 --> 00:47:02,350 arterial or secondary arterial four-lane road possibly even with a medium in 549 00:47:02,350 --> 00:47:06,210 the middle. I know that could be way down the road but isn't that in the the 550 00:47:06,210 --> 00:47:09,830 plans on our mobility plan? Yes, are the ultimate attendance works be a secondary 551 00:47:09,830 --> 00:47:13,790 arterial? Okay. That would be at least 110 feet of right away. Okay. So at least four 552 00:47:13,790 --> 00:47:17,770 lanes divided. So that's something to look forward to the problem is that may not 553 00:47:17,770 --> 00:47:22,930 happening time soon. Yeah. Okay. That's the ultimate intent. Okay. Okay. But it would be 554 00:47:22,930 --> 00:47:28,190 a lot of the traffic that these developments are going to bring in when that happens. Yeah. Okay. 555 00:47:28,330 --> 00:47:34,970 Thank you. So I hate to have Haley getting up and down. So maybe if we just keep her here, 556 00:47:35,070 --> 00:47:40,350 take your seat right there. Keep her here close. Okay. Sure. Because because the next question, 557 00:47:40,450 --> 00:47:44,190 I'm sorry. Yeah. You're fine. Go ahead. Because the next question really becomes, 558 00:47:44,190 --> 00:47:51,210 You know, when do we think that'll be with 137 homes here with the other three subdivisions 559 00:47:51,210 --> 00:48:00,370 which are hundreds of homes in there with the one, sorry, I don't have the names all 560 00:48:00,370 --> 00:48:10,260 down, with the Ryan Meadows there, I think we were just talking about it over Christmas 561 00:48:10,260 --> 00:48:29,560 notice that before the beginning of last year, there was a lot of dirt work done, but we didn't see a home in there and we turn around now and there has to be 30 or more homes in there, several waiting on some permits, I think, and then momentarily people start flooding into that neighborhood. 562 00:48:30,520 --> 00:48:34,420 they're flooding into, they're flooding into forest 563 00:48:34,420 --> 00:48:43,440 meadows and teasily, continuously, you know, we expect to see a huge influx 564 00:48:43,440 --> 00:48:50,820 of traffic in there very, very quickly. So can the commission help us to 565 00:48:50,820 --> 00:48:57,140 understand when we think that road is going to happen? And you know, where do we 566 00:48:57,140 --> 00:49:03,260 We go to make sure that happens before we run into problems both with traffic and both with safety. 567 00:49:03,400 --> 00:49:10,060 We also have an elementary school back there, so needless to say, if we've got a lot of traffic there and we have a problem, 568 00:49:10,560 --> 00:49:20,920 obviously we have people parking on our right away there in front of Thistle Hills on the median on a regular basis. 569 00:49:21,060 --> 00:49:25,480 I didn't realize that was a parking lot, by the way, so that happens on a regular basis. 570 00:49:25,480 --> 00:49:27,980 So we have cars all over the place. 571 00:49:29,120 --> 00:49:34,240 So question one is, when do we believe that that will actually happen to become a road? 572 00:49:34,300 --> 00:49:41,180 And then number two, we talked about this, this kitty that everybody, 573 00:49:41,360 --> 00:49:43,480 that all the developers are throwing money into. 574 00:49:44,060 --> 00:49:49,280 At what threshold does this kitty hit the mark that says, okay, it's time to spend us 575 00:49:49,280 --> 00:49:51,180 and start doing something to the roads? 576 00:49:52,260 --> 00:49:53,780 Well, I'll take a stab at that. 577 00:49:54,020 --> 00:49:56,900 That's not something that our commission deals with. 578 00:49:57,340 --> 00:50:01,760 That's something that actually is going to be internal city staff and policy that they draft. 579 00:50:02,580 --> 00:50:07,220 So we can't address when those improvements will be or what the timeframe is. 580 00:50:07,220 --> 00:50:10,780 That was something they would need to address to city staff directly on that. 581 00:50:12,040 --> 00:50:14,880 I'm sorry that that's just the honest answer that I can give you. 582 00:50:14,880 --> 00:50:30,900 Okay, so as we would address that to city staff in a non-event like this, where would we then put that on record for the issue that we have a need out there? 583 00:50:31,140 --> 00:50:33,500 Looks like staff would like to weigh in here. 584 00:50:33,500 --> 00:50:42,760 or a pension. A lot of that happens every year we look at it, they do a capital improvements plan. 585 00:50:45,100 --> 00:50:49,660 What they'll look at is the amount of money that's collected, part of the issue, 586 00:50:49,800 --> 00:50:56,960 particularly with Ryan and the applicant's representative kind of headed to the west of you, 587 00:50:57,040 --> 00:51:03,620 there's still a lot of single family homes that that a blood Ryan wrote and so there's quite a bit 588 00:51:03,620 --> 00:51:05,340 of acquisition that still needs to take place. 589 00:51:06,080 --> 00:51:10,580 Some of that occurs when there's a plat. 590 00:51:11,360 --> 00:51:14,800 So it's just a matter of acquiring that right away and at what time. 591 00:51:15,280 --> 00:51:21,240 When they come into plat, that's usually when the city is able to acquire that land. 592 00:51:21,860 --> 00:51:27,800 Otherwise, you're sort of really negotiating with a homeowner to try to purchase them. 593 00:51:29,520 --> 00:51:36,800 I'll just throw it said, of course, this is the preliminary flat stage as this development continues. 594 00:51:37,220 --> 00:51:46,220 There will be other public forums within this board or with the City Council to put those comments on record. 595 00:51:46,620 --> 00:51:47,900 I think is what you were asking, right? 596 00:51:48,080 --> 00:51:48,300 Okay. 597 00:51:48,620 --> 00:51:48,840 Okay. 598 00:51:49,120 --> 00:51:49,480 Thank you. 599 00:51:50,720 --> 00:51:51,840 Thank you for your comments. 600 00:51:51,840 --> 00:51:59,780 My next speaker is Karn Catherwood to be followed by John Dickerson. 601 00:52:08,170 --> 00:52:10,390 Good evening gentlemen and ladies. 602 00:52:11,150 --> 00:52:13,130 My name is Karn Catherwood. 603 00:52:13,370 --> 00:52:21,430 I live at 39-41 Andrew Avenue which is the free way that runs through the middle of 604 00:52:22,870 --> 00:52:31,190 We have a huge traffic problem, and I've lived there 11 years, I'm aware of the concerns 605 00:52:31,190 --> 00:52:37,930 of most of the people who have moved in since we've been there and those who were there 606 00:52:37,930 --> 00:52:44,890 before us. Most of these concerns have been answered by the previous settlement, and I'm 607 00:52:44,890 --> 00:52:48,250 grateful to hear some positive answers, 608 00:52:48,730 --> 00:52:51,170 and so I won't go back over those issues 609 00:52:51,170 --> 00:52:52,370 that he's already addressed. 610 00:52:53,330 --> 00:52:55,650 I would like to just mention once again, 611 00:52:55,770 --> 00:53:01,790 an emphasize that there is a need for a traffic survey, 612 00:53:01,970 --> 00:53:03,710 a traffic study, whether this is something 613 00:53:03,710 --> 00:53:08,770 that you guys do or that is a delegator to somebody else. 614 00:53:09,130 --> 00:53:12,370 We are very worried about gridlock and Ryan Road. 615 00:53:13,290 --> 00:53:17,370 All the new subdivisions, I'm not against them, I'm glad that they're there. 616 00:53:18,450 --> 00:53:23,390 We have to fill in the South Denton with folks and that's what we're doing. 617 00:53:24,010 --> 00:53:28,930 But Ryan Road is, it's not quite what I would call a mess, but it's getting there. 618 00:53:30,670 --> 00:53:36,170 And it's a little fuzzy in my mind whether or not there is a traffic survey plan. 619 00:53:36,310 --> 00:53:38,470 There was one done I think in 2014. 620 00:53:38,470 --> 00:53:44,110 But with all the housing, all the people, all the cars, you really need to do another one. 621 00:53:44,450 --> 00:53:47,330 And it needs to be official, not just something that a developer does. 622 00:53:47,870 --> 00:53:54,330 And I'm grateful for the input from those who are developing a creek site, and that's helpful. 623 00:53:54,950 --> 00:54:02,870 But something that is official from Country Club to Teasley, the whole length of the road in front of the elementary school, 624 00:54:03,750 --> 00:54:05,530 we need something done officially. 625 00:54:05,730 --> 00:54:07,190 It'll cost a few bucks, I know. 626 00:54:07,190 --> 00:54:19,050 But it would make the people in my neighborhood very happy, and with time it would probably accelerate Ryan road becoming four lanes, which is going to have to become at some point in the future. 627 00:54:19,550 --> 00:54:23,250 So I just throw that out there as something for you folks to think about. 628 00:54:23,890 --> 00:54:35,510 One other item, and I'll be very brief, when pre-approval was given for Creekside back in August of 2016, those of us who lived next door to them do nothing about it, 629 00:54:35,510 --> 00:54:38,730 But it was really done very quietly and very discreetly. 630 00:54:39,170 --> 00:54:42,450 We all wish you had been done a little bit more publicly. 631 00:54:43,270 --> 00:54:47,070 We wish we had known a little bit about it. 632 00:54:47,470 --> 00:54:48,110 We didn't. 633 00:54:48,310 --> 00:54:50,170 We thought all that land was still for sale. 634 00:54:50,890 --> 00:54:56,430 And I was sort of shocked and surprised just a couple of weeks ago to find out that this 635 00:54:56,430 --> 00:55:01,090 kind of development and analysis have been going on for a couple of years. 636 00:55:01,690 --> 00:55:03,890 I know it takes time to do this analysis. 637 00:55:03,890 --> 00:55:08,790 and the folks involved have done from what I can see 638 00:55:08,790 --> 00:55:11,270 a very good job, and I compliment them, 639 00:55:11,430 --> 00:55:14,070 but I wish there'd been a little bit more openness about it. 640 00:55:14,930 --> 00:55:17,470 It's created a funny impression in my neighborhood, 641 00:55:18,450 --> 00:55:22,490 and you don't want to create those kinds of funny impressions, 642 00:55:23,030 --> 00:55:24,390 because you have to deal with them 643 00:55:24,390 --> 00:55:26,330 and people exaggerate and get worried, 644 00:55:26,830 --> 00:55:29,430 and there's no point in that happening. 645 00:55:29,710 --> 00:55:32,010 A little bit more openness would have been helpful. 646 00:55:32,010 --> 00:55:37,670 I do want to congratulate the developer for the plans for 647 00:55:37,670 --> 00:55:39,690 common areas in the new neighborhood. 648 00:55:40,890 --> 00:55:42,430 Plans to keep the trees. 649 00:55:42,850 --> 00:55:44,190 We were all worried about that. 650 00:55:44,670 --> 00:55:47,950 They're going to come in now and cut down all of our 651 00:55:47,950 --> 00:55:51,250 beautiful trees that we have hanging over our backyards from 652 00:55:51,250 --> 00:55:56,050 the other side of the fence that divides us from the new 653 00:55:56,050 --> 00:55:57,050 area for Creekside. 654 00:55:57,510 --> 00:56:00,990 They're going to keep, I think he said, 65% or 45% of them. 655 00:56:02,510 --> 00:56:08,490 Thank you, thank you, thank you on behalf of the folks who's homes back up to your neighborhood. 656 00:56:08,730 --> 00:56:12,430 We'll watch you as you're building your houses because we can see you out there. 657 00:56:13,070 --> 00:56:19,150 And thank you as well to whoever did it that the gas well, which was directly and back at my backyard, 658 00:56:20,010 --> 00:56:24,970 within 400 feet of my property, is now defunct and dead. 659 00:56:25,350 --> 00:56:30,130 And I'm so grateful that we don't have to look out our kitchen window and see that horrible apparatus 660 00:56:30,130 --> 00:56:35,050 the apparatus and the infrastructure and know what's going on behind the scenes. 661 00:56:35,690 --> 00:56:40,270 I'm off for gas wells, mind you, I know we need them in Texas. 662 00:56:40,990 --> 00:56:44,890 But when they were that close to my backyard, that was a little worrisome. 663 00:56:45,210 --> 00:56:51,430 Thank you, that is now defunct and we can look at some of my houses rather than have to look at stuff like that. 664 00:56:52,050 --> 00:56:52,950 Thank you for your attention. 665 00:56:53,430 --> 00:56:54,510 Thank you for your comments, sir. 666 00:56:55,890 --> 00:56:58,070 Mr. Clarification, Mr. Dirkson, have you already spoke? 667 00:56:58,070 --> 00:57:02,730 Okay, let me go on have a billy caraway 668 00:57:05,330 --> 00:57:06,990 30909 Andrew Avenue. 669 00:57:07,290 --> 00:57:07,650 Billy 670 00:57:13,410 --> 00:57:18,090 Caraway 30909 Andrew Avenue in our home backs up to the development. 671 00:57:18,690 --> 00:57:20,890 I think most of my questions have been answered. 672 00:57:21,310 --> 00:57:23,470 I do have a couple to the developer. 673 00:57:24,870 --> 00:57:30,630 They had resurfaced run road and then they put the housing addition down at the end and 674 00:57:30,630 --> 00:57:33,070 within two weeks all run roads tore up. 675 00:57:33,450 --> 00:57:34,650 How are we going to handle this? 676 00:57:34,650 --> 00:57:38,110 you know, keeping it from getting tore up during one's construction starts. 677 00:57:39,390 --> 00:57:45,470 And the other one is most of the people on Andrew Avenue, oh, has swimming pools. 678 00:57:46,310 --> 00:57:48,450 Where are we going to put the batch plants at? 679 00:57:49,250 --> 00:57:52,410 Are they going to be right or close to us or are we going to put them back when they start 680 00:57:52,410 --> 00:57:54,250 to building the roads out there? 681 00:57:54,650 --> 00:57:54,770 Okay. 682 00:57:54,850 --> 00:57:55,590 So my two questions. 683 00:57:56,050 --> 00:57:56,190 Great. 684 00:57:56,410 --> 00:57:57,470 That's all I had, thank you. 685 00:57:57,650 --> 00:57:58,610 I'll ask the developers. 686 00:57:58,830 --> 00:58:01,450 Last card I have, and he can address those two questions, too. 687 00:58:01,930 --> 00:58:08,150 The last card I have is John Dickerson, or if you'd like to have your Mr. Fletcher speak 688 00:58:08,150 --> 00:58:10,210 for on your behalf, I'll be fine with me. 689 00:58:11,430 --> 00:58:15,090 I'll answer the first question first as far as the batch plan. 690 00:58:15,250 --> 00:58:21,990 The batch plan would be located within the development on the outside of the tree preserve 691 00:58:21,990 --> 00:58:23,370 kind of in the lots. 692 00:58:24,050 --> 00:58:28,750 So typically what they'll do is they'll come in, they'll do all the earthwork, they'll bench 693 00:58:28,750 --> 00:58:29,330 the lots. 694 00:58:29,330 --> 00:58:34,670 They'll create an area within the lots that's flat where they can set up the batch plant. 695 00:58:34,990 --> 00:58:37,350 They'll go in, they'll put all the utilities in. 696 00:58:37,850 --> 00:58:45,170 Once they get ready to pay, typically the paving on a project like this is probably only going to take four to five weeks at the most. 697 00:58:46,310 --> 00:58:51,090 So the amount of time the batch plant would probably be four to five weeks. 698 00:58:51,510 --> 00:58:57,690 In the batch plant would probably be located no closer than 250 feet. 699 00:58:57,690 --> 00:59:01,550 I think there's requirements within the city code that we have to follow. 700 00:59:01,850 --> 00:59:13,170 I'm not sure exactly what that distance is, but just the areas that would accommodate the batch plan would probably be well over 200 feet from those back property lines. 701 00:59:14,530 --> 00:59:25,590 As far as the roadway construction, generally when we go through and have pre-con, the city inspectors go out and they do an inspection of Ryan Road, the existing conditions. 702 00:59:25,590 --> 00:59:30,890 The city inspectors are monitoring the contractors throughout the development process. 703 00:59:31,550 --> 00:59:38,090 If there's damage to Ryan Road that they fill is directly associated with the construction or specific contractor, 704 00:59:38,670 --> 00:59:44,270 they will note that and that will be something that they will have to fix or remedy. 705 00:59:45,250 --> 00:59:50,810 So that portion of the process is really, I would say it's really governed or 706 00:59:50,810 --> 00:59:57,270 or watched over by the city inspectors, but there is a process to where they're watching 707 00:59:57,270 --> 00:59:59,810 the construction and making note of any. 708 01:00:00,000 --> 01:00:29,580 There are some damages that they feel that were occurred that accounted for by the construction. Okay. I'm Mr. Dr. Roger to the microphone. City staff has all of your contact information for you and your firms are correct. So any of the residents that are here that may have some follow-up questions or so forth, can certainly reach out to Haley and request contact information for you to follow up with additional questions if they have them. Yeah, absolutely. I'd be happy to. The other thing I apologize I didn't bring it tonight. 709 01:00:29,580 --> 01:00:32,460 We've got some real nice renderings, color renderings. 710 01:00:32,980 --> 01:00:38,320 If I would have realized, there were a lot of questions I would have brought that and share that with you. 711 01:00:38,760 --> 01:00:40,760 I'm happy to provide that and share it. 712 01:00:41,020 --> 01:00:46,620 It shows kind of the tree preserves the trails, the amenities that we're doing. 713 01:00:46,620 --> 01:00:49,760 It shows the entry feature, it shows the screening fences. 714 01:00:50,360 --> 01:00:54,060 So if there's interest in that, I would be happy to share. 715 01:00:54,060 --> 01:00:59,960 That's part of the PADA so it is public it is a public document, but I'll be glad to email that out 716 01:00:59,960 --> 01:01:04,020 Where can they get that if it's a public document? They could request it through the city 717 01:01:04,020 --> 01:01:05,180 It's part of ordinance 718 01:01:07,400 --> 01:01:12,980 2016-251 the documents a lot of times when they scan the ordinance the quality of the 719 01:01:13,560 --> 01:01:19,260 Exhibits isn't quite what it would be if I provided the PDF so they can either get it through there 720 01:01:19,260 --> 01:01:21,020 I'll be happy to to 721 01:01:21,020 --> 01:01:23,840 Provide that to anyone that would want to copy of it 722 01:01:24,060 --> 01:01:26,860 Okay, great. Thank you for that. You have something. 723 01:01:27,100 --> 01:01:30,920 I just wanted to, if someone isn't interested in receiving that document, 724 01:01:31,140 --> 01:01:35,400 at the end of the meeting, if you want to provide your email address to Athena, 725 01:01:35,500 --> 01:01:37,800 we can email that out to everyone tomorrow. 726 01:01:38,500 --> 01:01:44,120 Okay, great. Thank you. That's all the cards that I have here before us. 727 01:01:44,480 --> 01:01:48,020 This is not a public hearing, but it is an item for individual consideration. 728 01:01:48,380 --> 01:01:52,120 So, if you would like to speak on the item, you may, you'll need to fill out a card. 729 01:01:52,120 --> 01:01:55,100 And I have no more cards. 730 01:01:56,200 --> 01:02:04,620 So with that, I will move us on on this particular item and open the floor up and on Commissioner Sullivan. 731 01:02:05,360 --> 01:02:06,280 Thank you, Chair. 732 01:02:07,020 --> 01:02:16,920 My biggest concern about this project is simply the traffic that is going to be the resulting on Ryan Road number one. 733 01:02:16,920 --> 01:02:23,680 Hickory Creek, second of all, because I don't think that when you look at the size of 734 01:02:23,680 --> 01:02:29,320 this old hill and how many trips that generates, you're all going to be about the same size 735 01:02:29,320 --> 01:02:32,420 and who knows how many cars are going to be in there. 736 01:02:34,040 --> 01:02:40,300 The last traffic surveys has been mentioned was 2014 and that was for disproportion of Ryan 737 01:02:40,300 --> 01:02:42,280 road, not the entire Ryan Road. 738 01:02:42,980 --> 01:02:49,060 Since the Antizit Trail has added 167 homes, Ryan Meadows, 141, 739 01:02:49,760 --> 01:02:52,720 to go along with 150 some odd and fissile hill, 740 01:02:53,220 --> 01:02:57,120 plus who knows how many enforced ridge in Manicito subdivisions, 741 01:02:57,120 --> 01:03:03,340 that all forced ridge in Manicito were on the north side of Sharon Rose. 742 01:03:04,080 --> 01:03:09,940 Elementary schools at both ends, plus a wall mark on the eastern end of it. 743 01:03:09,940 --> 01:03:16,780 I noticed in the handout that we got this evening for next meeting that a traffic analysis 744 01:03:16,780 --> 01:03:21,800 required with the development would generate equal to or more than a thousand vehicle trips 745 01:03:21,800 --> 01:03:22,400 per day. 746 01:03:23,060 --> 01:03:28,200 Well, obviously one development may or may not do that, the size that we're talking about. 747 01:03:28,700 --> 01:03:33,400 But when you look at all the developments that have gone in and are relatively short length 748 01:03:33,400 --> 01:03:40,700 of road, I think that the least the city could do is to perform a traffic survey, spend 749 01:03:40,700 --> 01:03:48,420 the $896,000 that these guys are putting up, plus who knows how much more teasily and 750 01:03:48,420 --> 01:03:53,700 Ryan Meadows has put up and make it a full four-lane highway. 751 01:03:53,920 --> 01:03:59,100 And I don't know if that is a condition that we can add to these people or if it's something 752 01:03:59,100 --> 01:04:07,260 that maybe needs to be tabled so that the city can do its magic in making sure 753 01:04:07,260 --> 01:04:12,560 that there is no additional impact on Ryan Road to further deteriorate the 754 01:04:12,560 --> 01:04:16,740 road and just make it more of a hassle because what's gonna happen is as every 755 01:04:16,740 --> 01:04:21,900 citizen in this room can attest to the one thing we all agree to is our city streets 756 01:04:21,900 --> 01:04:28,860 are not very good as a why compound the problem to come in after the fact after all 757 01:04:28,860 --> 01:04:32,960 these subdivisions have gone in, including the other two phases that they're going to put in, 758 01:04:33,720 --> 01:04:38,920 and then we're going to tear up Ryan Road and make it a bigger hassle to get up and down the street. 759 01:04:39,460 --> 01:04:45,720 It just makes no sense to me. Thank you. Thank you. Commissioner Beck. 760 01:04:46,300 --> 01:04:50,560 Thank you, Chair. Actually, Commissioner Sullivan kind of hit a lot of what I wanted to dress too, 761 01:04:50,620 --> 01:04:56,880 but I did want to go on record and see if we could give some satisfaction to the people that have to 762 01:04:56,880 --> 01:05:02,300 live out there where there's anybody in city night, Haley, Ron, that can give us an 763 01:05:02,300 --> 01:05:09,040 idea when we could motivate whoever needs to be to do a TIA traffic impact analysis. 764 01:05:09,600 --> 01:05:15,260 I agree. It's frustrating to know that this road is going to be widened eventually, but 765 01:05:15,260 --> 01:05:21,540 not knowing when it's frustrating. We can't get a handle on that as well as we like, but 766 01:05:21,540 --> 01:05:30,680 The CIA seems like considering all the development that's going on there, we should be able to do that and be able to give assistance and answer when that will happen. 767 01:05:30,960 --> 01:05:45,640 Is that run, would you be the right person to ask on that, is there, who would be the individual in the city that we could pick on to try and get that started? 768 01:05:45,640 --> 01:05:48,200 We should also try to attempt to answer that question. 769 01:05:48,520 --> 01:05:54,720 Of course, Ryan Rowan has always been on our radar, obviously part of our future mobility 770 01:05:54,720 --> 01:05:57,520 plan and hopefully our CIP program as well. 771 01:05:58,760 --> 01:06:06,840 I think the people that are in charge are responsible for that are listening, or if they're not, 772 01:06:07,060 --> 01:06:13,720 we will definitely make sure that they hear you and watch this video to make sure that 773 01:06:13,720 --> 01:06:17,720 that they hear what the concerns are along Ryan Road is. 774 01:06:18,120 --> 01:06:20,180 I'm wondering would it be possible to maybe 775 01:06:20,180 --> 01:06:22,120 Richard or somebody can answer this? 776 01:06:23,040 --> 01:06:25,940 Could by our next PNZ meeting, 777 01:06:25,940 --> 01:06:28,280 could we have somebody maybe come to the work session 778 01:06:28,560 --> 01:06:30,560 and give us a little bit more detailed information 779 01:06:30,940 --> 01:06:33,340 that we can share with the community? 780 01:06:33,660 --> 01:06:36,260 Is that possible or a project matrix I ask about that? 781 01:06:36,700 --> 01:06:39,660 Yes, in fact, at the next meeting, 782 01:06:39,660 --> 01:06:42,420 we'll be discussing the new criteria manual, 783 01:06:42,420 --> 01:06:42,540 All right. 784 01:06:43,220 --> 01:06:45,080 And the capital improvements director, 785 01:06:45,260 --> 01:06:48,160 city engineer, we'll be here at that meeting. 786 01:06:49,220 --> 01:06:53,060 So I will let him know to be prepared to answer those questions. 787 01:06:53,280 --> 01:06:53,980 Right, thank you. 788 01:06:54,160 --> 01:06:54,400 Thank you. 789 01:06:54,620 --> 01:06:55,600 Will that be Todd Estes? 790 01:06:55,820 --> 01:06:56,520 It'll be Todd Estes. 791 01:06:56,700 --> 01:06:58,880 Okay, and the other contact person might be Jim James. 792 01:06:59,380 --> 01:06:59,600 Correct. 793 01:07:00,060 --> 01:07:02,880 Okay, so those would be a couple of city staffers 794 01:07:02,880 --> 01:07:04,960 that would be in a position that I think address 795 01:07:04,960 --> 01:07:07,560 some of the questions here before us. 796 01:07:08,340 --> 01:07:08,980 Commissioner Smith. 797 01:07:09,180 --> 01:07:09,500 Thank you, Chair. 798 01:07:09,500 --> 01:07:15,240 I think that the TIA would be a great thing to do, but let's look at the material facts 799 01:07:15,240 --> 01:07:16,260 what we're talking about tonight. 800 01:07:16,260 --> 01:07:18,280 We're talking about a development that's ready to come in now. 801 01:07:18,980 --> 01:07:23,280 Even if the TIA comes back, as Richard has already mentioned, there's further down a 802 01:07:23,280 --> 01:07:23,820 Ryan road. 803 01:07:23,960 --> 01:07:29,120 If there wanted to be future expansion, we've got land that still needs to be claimed. 804 01:07:30,160 --> 01:07:33,700 And we have to wait for the MNO domain, or we have to wait for re-plotting on those lands 805 01:07:33,700 --> 01:07:36,200 and you tell me when that's going to happen. 806 01:07:36,200 --> 01:07:41,660 And so the expansion of Ryan Road is unknown and if we had to put at least a timeline on it 807 01:07:41,660 --> 01:07:45,980 It's probably nothing the next five years if I had if I had to make a wild guess off the cuff 808 01:07:45,980 --> 01:07:49,060 So sit here and say let's get the TIA done 809 01:07:49,060 --> 01:07:53,700 The TIA is just gonna come back and tell us exactly what you know. It's it's bogged 810 01:07:53,700 --> 01:07:57,720 It's gonna be bogged and we're gonna come back. So are we gonna expand Ryan Road? 811 01:07:58,360 --> 01:08:02,300 Okay, we're not gonna be able to expand Ryan Road tomorrow or next week or next year 812 01:08:02,300 --> 01:08:05,180 And so I just say put it up for consideration that yes 813 01:08:05,180 --> 01:08:08,840 Yes, well, a TIA and talk about expanding Ryan Road is great. 814 01:08:09,460 --> 01:08:14,160 It's not immediate, it's not something that can be done quickly and we have something we have to vote on now and talk about. 815 01:08:14,360 --> 01:08:21,780 So not really anything more to add to it and just help everyone understand and get some clarity to the actual grow toss of the situation here. 816 01:08:22,040 --> 01:08:30,520 So, I can just add to that just a reminder that this is a preliminary plan so that this item will come up for final. 817 01:08:31,780 --> 01:08:36,700 And I think that might give staff some more time to address those concerns. 818 01:08:37,000 --> 01:08:37,320 Correct. 819 01:08:41,720 --> 01:08:42,440 Commissioner Smith. 820 01:08:43,080 --> 01:08:46,040 Motion to accept the city staff's recommendations. 821 01:08:47,500 --> 01:08:49,680 And are there some conditions on that? 822 01:08:50,060 --> 01:08:51,660 The recommendation for approval? 823 01:08:53,120 --> 01:08:53,760 No. 824 01:08:54,680 --> 01:08:55,660 I think there were. 825 01:08:57,920 --> 01:09:02,820 The two that are presented in the package, so with the city staff's 826 01:09:02,820 --> 01:09:05,960 Just a clarification for the guys in the back when they do the records. 827 01:09:06,160 --> 01:09:06,560 You're welcome. 828 01:09:07,100 --> 01:09:11,700 So we have a motion to approve with the two conditions as recommended in our back up. 829 01:09:12,000 --> 01:09:12,160 Okay. 830 01:09:12,700 --> 01:09:13,540 Commissioner Sanchez. 831 01:09:13,800 --> 01:09:14,280 I second that. 832 01:09:14,600 --> 01:09:14,700 Okay. 833 01:09:15,380 --> 01:09:17,500 We have a first and a second for approval. 834 01:09:18,120 --> 01:09:18,980 Any discussion? 835 01:09:23,850 --> 01:09:25,310 I'll make a comment before we vote. 836 01:09:25,670 --> 01:09:36,330 I would echo Commissioner Sullivan's concerns about ride road and the improvements and a lot of your points were discussed in great detail. 837 01:09:36,990 --> 01:09:39,170 a number or a couple years ago, I guess, 838 01:09:39,350 --> 01:09:41,690 when the traffic impact fees came before us 839 01:09:41,690 --> 01:09:43,050 and were adopted by the city. 840 01:09:43,590 --> 01:09:45,330 There's a concern expressed at the time. 841 01:09:46,030 --> 01:09:47,230 Is it worth collecting fees? 842 01:09:47,630 --> 01:09:49,750 People will move in, finally get enough money, 843 01:09:49,990 --> 01:09:50,990 and then we'll go tear up the roads. 844 01:09:51,450 --> 01:09:54,970 And that's unfortunately the way that that move forward, 845 01:09:55,450 --> 01:09:57,630 and there's gonna be, I think, the process 846 01:09:57,630 --> 01:09:59,610 for our city going forward to play 847 01:09:59,610 --> 01:10:00,890 unfortunately some catch up. 848 01:10:02,090 --> 01:10:03,950 But these gentlemen are contributing 849 01:10:03,950 --> 01:10:06,270 a significant amount of money to that effort 850 01:10:06,270 --> 01:10:11,290 above and beyond two times what's currently required and so you know I think 851 01:10:11,290 --> 01:10:16,130 they're certainly paying their fair share for their impact and their development 852 01:10:16,130 --> 01:10:20,890 and so with that I'm going to support the motion and I have a comment from 853 01:10:20,890 --> 01:10:26,590 Commissioner Sanchez. I'm relatively new on this commission and it seems like 854 01:10:26,590 --> 01:10:29,830 that's one of the big issues we've had every time we've talked about 855 01:10:29,830 --> 01:10:34,950 developments is that the roads usually I'm gonna be done when the development is 856 01:10:34,950 --> 01:10:42,150 done. So I don't really see a solution until the funds, those impact funds are collected. 857 01:10:42,630 --> 01:10:47,990 So it just seems like you're not the only people that are facing this every week or every 858 01:10:47,990 --> 01:10:53,250 couple of weeks that we meet. We find the same issue over and over again throughout the city. 859 01:10:53,850 --> 01:10:59,490 And there's no solution at this time, other than when those funds are collected and then 860 01:10:59,490 --> 01:11:04,410 And the city starts using those funds to be able to expand these roads. 861 01:11:05,090 --> 01:11:10,790 And just like Mr. Smith said, basically, it's, we don't have the answer. 862 01:11:11,450 --> 01:11:19,070 But hopefully, as the, as money to get collected, then those roads are, are developed. 863 01:11:19,710 --> 01:11:21,190 Okay, commissioner back. 864 01:11:22,490 --> 01:11:22,910 Thank you, Chair. 865 01:11:23,430 --> 01:11:27,590 I just want to thank everybody for coming out tonight for the citizens and making their presentation. 866 01:11:27,590 --> 01:11:33,290 and, you know, this commission needs a lot of input from the people out there that we 867 01:11:33,290 --> 01:11:37,390 serve. I appreciate you coming down. I appreciate Mr. Fletcher, Mr. Dickerson, for their presentation, 868 01:11:37,610 --> 01:11:42,890 for clearing up a lot of things, as Commissioner Smith suggested. And I know this is just a preliminary 869 01:11:42,890 --> 01:11:47,950 plan, but community meetings are always a great, great thing to do to all set a lot of concern. 870 01:11:48,750 --> 01:11:55,330 One of the, one thing I did want to point out that I was delighted to hear you mention is the 871 01:11:55,330 --> 01:12:03,090 salvaging of I think 60 65 percent of the trees. Yeah, you could have removed a lot more by city center and the fact that you've done that that 872 01:12:03,090 --> 01:12:11,710 pleases me tremendously. So I'm glad to hear that and I think everybody that lives in that area, I'd recognize the fact that it could have been a lot worse. So these gentlemen 873 01:12:11,710 --> 01:12:15,830 and being commended for salvaging what they have done there. So thank you for that. 874 01:12:17,910 --> 01:12:26,430 I can understand the philosophy of gosh, that's not our role and the you know the city works low and this is what we talked about forever. 875 01:12:27,430 --> 01:12:39,130 But I don't understand the idea that current citizens living in current houses have to pay the price for the city not doing their job. 876 01:12:39,130 --> 01:12:47,230 and so I don't see why it is we continue as a board to approve developments when we know darn good and well 877 01:12:47,230 --> 01:12:54,590 other people are going to be negatively impacted and yet we use the idea of growth as the excuse you know what 878 01:12:54,590 --> 01:12:57,590 people are already here let's take care of our own first 879 01:12:57,590 --> 01:13:04,690 if speculators want to come in and buy land and build houses someday great for them 880 01:13:04,690 --> 01:13:08,070 But meanwhile, I think we need to protect our citizens first. 881 01:13:10,830 --> 01:13:11,510 Commissioner Smith. 882 01:13:11,730 --> 01:13:12,070 Thank you, Chair. 883 01:13:12,670 --> 01:13:21,130 Steve, is there anything on my motion or anything you would want to add to a motion that would make it better for the citizens who are currently there? 884 01:13:21,230 --> 01:13:25,070 That's purely just an informational question that we can go to vote. 885 01:13:25,210 --> 01:13:31,170 It can be struck down if you bring up a motion or bring up a motion that sounds that'd be more immediately to the situation. 886 01:13:32,870 --> 01:13:44,130 I've been told that we can't do that, so a condition would be we wait till the traffic impact study is made for the entire Ryan road before any more construction is done, that would be my motion. 887 01:13:48,080 --> 01:13:50,040 commissioners for not to keep playing tennis ball here. 888 01:13:50,660 --> 01:13:54,200 Legal, can you give just a public statement for 889 01:13:55,020 --> 01:13:57,820 plenary flat, it's approved tonight, moves forward. 890 01:13:58,080 --> 01:14:03,420 How much timeline, how much runway do we think we have to be able to get the PIA and before a final approval for this is done? 891 01:14:05,120 --> 01:14:10,280 One would final, do we have a schedule done already, final flat? 892 01:14:11,160 --> 01:14:14,800 I'd have Haley addressed the, I think planning we have a better idea of the timeline. 893 01:14:14,800 --> 01:14:14,980 The timeline. 894 01:14:15,380 --> 01:14:16,100 The timeline. 895 01:14:16,680 --> 01:14:17,000 Yes. 896 01:14:17,660 --> 01:14:21,640 There's two years between a preliminary plan, the final plan, before the preliminary would 897 01:14:21,640 --> 01:14:23,260 expire and a new one would be required. 898 01:14:24,820 --> 01:14:28,620 So that would be the potential time frame in which that could be done. 899 01:14:29,060 --> 01:14:32,600 But I will say that the final plan for this is in review with staff currently. 900 01:14:33,960 --> 01:14:38,400 So fairly soon after the gas flow plugging is complete, I expect that that would be ready 901 01:14:38,400 --> 01:14:39,200 to come before the board. 902 01:14:39,200 --> 01:14:48,640 do you know I guess the question was talking months weeks? It really depends on the gas 903 01:14:48,640 --> 01:14:52,300 well in the review of their civil plans, but it would most likely be within the next couple 904 01:14:52,300 --> 01:14:59,140 of months. Okay. And then up to two years, I mean, I think the state's response now would 905 01:14:59,140 --> 01:14:59,840 So come final. 906 01:15:02,600 --> 01:15:08,820 Just to clarify, the TIA would only relate to their project. It wouldn't be for the entire. 907 01:15:10,970 --> 01:15:31,150 There's nothing we can add on before we prove. I think it would be difficult for the entire length, considering they are contributing to the impact that they are, what was negotiated part of that agreement. Typically, when you look at a road, it's designed to, obviously, a certain capacity. 908 01:15:31,150 --> 01:15:34,490 capacity, or it can handle certain amount of vehicles per lane. 909 01:15:35,370 --> 01:15:39,650 It's kind of like that chicken or the egg type approach of what comes first. 910 01:15:40,710 --> 01:15:43,950 And it starts to, when it starts to, that level of service starts to degrade. 911 01:15:44,310 --> 01:15:47,910 That's typically when you'll see those improvements move forward. 912 01:15:48,750 --> 01:15:52,790 With this one, it's a little bit more complicated because there is right away that needs to be acquired. 913 01:15:53,770 --> 01:16:00,510 As well as, if I'm not mistaken, there's some quite a bit of utility lines that would probably need to be relocated as well. 914 01:16:00,510 --> 01:16:06,390 So it's it's quite a bit of an undertaking and I'll just add or are we 915 01:16:06,390 --> 01:16:13,110 referring to that traffic impact study would would be narrowly for that 916 01:16:13,110 --> 01:16:16,090 development only correct that that's all you get out of it. 917 01:16:16,790 --> 01:16:21,130 It'd be tough for us to be able to ask for the CIA for an entire road whenever it's 918 01:16:21,130 --> 01:16:23,110 a world we're only talking about the preliminary planning for one. 919 01:16:29,710 --> 01:16:42,910 We've got a motion before us and a second for approval with the two conditions as mentioned in back up and see more to any more discussion on my call for a vote on the board. 920 01:16:54,400 --> 01:16:56,860 Motion is going to carry four to one. 921 01:16:56,860 --> 01:17:02,040 and that will move us to our public hearing section this evening, 922 01:17:07,290 --> 01:17:13,350 in the room a minute to clear if people are going to get out. 923 01:17:14,650 --> 01:17:15,650 Go up any project. 924 01:17:25,370 --> 01:17:26,190 Thanks for coming out. 925 01:17:39,130 --> 01:17:49,170 This time I'm going to move on to our agenda item 4A. I'm going to open the public hearing for Z17-0025B. 926 01:17:52,900 --> 01:17:55,740 This is the item that's going to be continued. Commissioner Beck. 927 01:17:55,740 --> 01:18:05,340 I move that we move this House to put this forward to the date certain that we were 928 01:18:05,340 --> 01:18:13,320 twenty first awesome good job Commissioner Smith I'm we have a motion to 929 01:18:13,320 --> 01:18:17,400 continue to date certain of February the 21st on this item we're going to leave 930 01:18:17,400 --> 01:18:22,800 it open so it does not need to be re-noticed and no call for a vote on board 931 01:18:22,800 --> 01:18:23,540 That 932 01:18:32,220 --> 01:18:34,100 motion is going to carry 5-0. 933 01:18:35,240 --> 01:18:41,600 As announced at the beginning of our meeting, our items 4-B and 4-C, the Woodlands on 934 01:18:41,600 --> 01:18:47,000 McKinney Street have both win with drawn, and we do not have a date certain on those. 935 01:18:48,040 --> 01:18:54,120 So that will conclude our public hearings items tonight, and that will move us to our project 936 01:18:54,120 --> 01:18:55,900 matrix and concluding items. 937 01:18:58,230 --> 01:18:58,950 Commissioner Smith. 938 01:18:59,370 --> 01:18:59,850 Thank you, Chair. 939 01:19:00,570 --> 01:19:05,910 Richard, is there any kind of conversation we can have, at least there in work, work session that would be 940 01:19:07,270 --> 01:19:11,550 around what power we have as a commission or recommendation we can make the City Council for 941 01:19:12,130 --> 01:19:14,170 Developers to have more neighborhood meetings 942 01:19:14,930 --> 01:19:18,510 And what scenarios we can do that we have we have maybe a report from you guys on 943 01:19:19,370 --> 01:19:24,650 What we can do to be able to try to put that make that make that a precedent because I think that oh that's a question 944 01:19:24,650 --> 01:19:26,870 We've been having quite a bit during meetings having 945 01:19:26,870 --> 01:19:29,990 I mean, call the applicant up here, we'll talk them real quick. 946 01:19:30,510 --> 01:19:31,430 Have you had a neighborhood meeting? 947 01:19:31,650 --> 01:19:32,670 Yes, you have, no, you haven't. 948 01:19:32,730 --> 01:19:36,190 And it seems like every single time it's been the, yes, there's been a neighborhood meeting. 949 01:19:37,430 --> 01:19:39,810 It's just such a much smoother process. 950 01:19:41,010 --> 01:19:41,410 Absolutely. 951 01:19:41,710 --> 01:19:46,890 In fact, we have that as one of the items for the, as part of the code update. 952 01:19:47,250 --> 01:19:47,410 Okay. 953 01:19:47,690 --> 01:19:50,690 To sort of formalize that in more, more in the code. 954 01:19:51,190 --> 01:19:56,550 Just to kind of give a for example, if you remember the palladium, I was telling the chair 955 01:19:56,550 --> 01:20:00,870 earlier, we had quite a number of folks here speaking, you know, against that. 956 01:20:00,930 --> 01:20:03,230 Would you say which project that was again, could take me a minute? 957 01:20:03,590 --> 01:20:11,910 This was the site on, it had a component of affordable housing that was changing to NRMU, 958 01:20:12,830 --> 01:20:16,890 NRMU12, this was loop and point Seattle. 959 01:20:19,050 --> 01:20:25,530 When that item came to council, the applicant actually, the very next day, started revising 960 01:20:25,530 --> 01:20:30,510 their plan went out and met with the neighbors and when we had the public hearing in front 961 01:20:30,510 --> 01:20:35,570 of the city council, the two ladies that were very outspoken, they were the only ones 962 01:20:35,570 --> 01:20:40,290 that showed up, sat through five hours of public hearing to get up to speak in support 963 01:20:40,810 --> 01:20:44,890 of the development. Is the first thing, first time I've ever seen that, am I 22 years doing 964 01:20:44,890 --> 01:20:51,050 it, but it goes to your point. It goes a long way. So any time an applicant comes forward, 965 01:20:51,050 --> 01:20:53,610 where now we've been advising them, 966 01:20:53,810 --> 01:20:56,210 it's really in their best interest to meet with the neighbors. 967 01:20:56,330 --> 01:20:58,870 I don't think Commissioner Strange could probably 968 01:20:58,870 --> 01:20:59,690 send a thousand of me here. 969 01:20:59,710 --> 01:21:01,090 I'd hate to be going to the developers 970 01:21:01,090 --> 01:21:02,830 and having to throw up another piece of red tape, 971 01:21:03,090 --> 01:21:06,810 but I don't like adding more bureaucracy to bureaucracy already, 972 01:21:07,030 --> 01:21:09,650 but there are sometimes some new rules and regulations 973 01:21:10,510 --> 01:21:11,610 can't speed up a process. 974 01:21:11,690 --> 01:21:13,610 You had a rule to be able to speed up a process. 975 01:21:13,750 --> 01:21:16,130 So yeah, if we can have an update on it, 976 01:21:16,190 --> 01:21:18,750 or if there's no need for it, then I think it's one 977 01:21:18,750 --> 01:21:22,650 One of those, if you know going into it, it's one thing. 978 01:21:22,810 --> 01:21:26,190 You can sort of plan that in your schedule, but if an applicant comes in and 979 01:21:26,190 --> 01:21:30,630 we're through the, and then all of a sudden we bring it on, it's not fair, 980 01:21:31,030 --> 01:21:33,690 but we just need to be consistent in how we help. 981 01:21:33,690 --> 01:21:34,750 Sure, thank you. 982 01:21:36,330 --> 01:21:37,010 Anything else? 983 01:21:39,010 --> 01:21:41,610 When is the item that I asked for? 984 01:21:42,530 --> 01:21:45,030 I want to say it's been a few weeks ago, maybe, for Christmas. 985 01:21:45,730 --> 01:21:52,210 that kind of is the same thing we spent a lot of time on tonight talking about whose responsibility it is on all the paintings. 986 01:21:52,390 --> 01:21:54,470 Is that going to be next week, or next week, or next week, or next week? 987 01:21:54,510 --> 01:22:02,230 That will be part of the discussion at the next work session with respect to the transportation manual. 988 01:22:02,810 --> 01:22:03,910 Great. I'm looking forward to that. 989 01:22:04,050 --> 01:22:04,810 Thank you for getting that on. 990 01:22:05,670 --> 01:22:05,770 Okay. 991 01:22:06,230 --> 01:22:06,630 Anything else? 992 01:22:06,970 --> 01:22:07,350 Anybody else? 993 01:22:08,110 --> 01:22:08,250 Okay. 994 01:22:08,250 --> 01:22:12,370 With that, I'm going to close us tonight at 7.37. 995 01:22:12,710 --> 01:22:13,750 Thank you, everyone, for coming out.