[0:00] yes I will just I'll just comment we did [0:03] go through this in quite detail at APC [0:06] and uh thank Brian for as usual his very [0:10] diligent and very thorough uh budget [0:13] report so we did ask quite a lot of [0:15] questions then and [0:17] answers all satisfactory so [0:19] um I'll be happy at the time to move the [0:22] item okay [0:24] commissioner enrich I I was just to Echo [0:28] of that being on APC and what Brian was [0:31] explaining [0:33] um you know we all caught that we're not [0:35] spending money on the call to cut a [0:36] tunnel but it's because of our [0:38] allocation for me of how we assign costs [0:41] and things like that so it's not going [0:43] call the cut tunnel [0:45] um that project is done and over this is [0:49] really complex if you're if you're here [0:51] for the first time none of us have a [0:53] budget like this and the reason why is [0:55] if you really want to look at year over [0:57] year you just look at our staff [0:59] Administration cost everything else is [1:01] Project driven there's lots of projects [1:03] those costs go up and they're all [1:05] proportional and they all have a source [1:07] of funding [1:08] our biggest key factor is staying for [1:11] all that Administration essentially our [1:13] own operating cost although some of our [1:15] staff are also assigned to outside [1:17] projects because they're working on the [1:19] project but we have that one percent [1:21] limitation and we were right around the [1:24] 0.83 so I think we'll add to second that [1:27] and thank Brian and staff for modifying [1:31] your presentation for the comments that [1:33] we had too thank you okay member [1:35] Fidelity yes [1:38] um great job I was just wondering on the [1:40] state revenue side if in fact the [1:42] governor signs the budget with the [1:44] transit deal [1:45] in it might there be additional revenues [1:48] that come in any way shape or form [1:51] yeah there was there was [1:53] um a comment Hisham had come to my [1:56] office earlier this earlier this [1:57] afternoon and talked about maybe Sunday [1:59] I think there was the I-80 project San [2:03] Pablo Dam I believe might be in that we [2:06] would go out and do an RFP on that so it [2:08] would be a time frame of maybe six [2:10] months and and we will add that at the [2:12] mid-year so we'll we'll make sure that [2:15] we [2:15] keep an eye out for those additional [2:17] revenues and with any other project that [2:19] comes along the lines we'll we'll budget [2:22] forward at mid-year great thank you [2:25] okay see another board members who will [2:28] go out to the I will [2:32] um invite members of the [2:35] room here to have public comments [2:39] if there are any [2:42] okay we will go out to the public do we [2:44] have any written or verbal public [2:47] comments [2:50] no written or verbal public comment [2:53] okay thank you we will close the public [2:55] hearing and we will look to commissioner [2:58] noet [3:01] the item again second [3:04] okay we have a motion by Noah X second [3:07] by enrich [3:09] terryanne can we do a roll call [3:12] commissioner Carlson [3:14] hi [3:15] commissioner fideli hi [3:18] commissioner Haskew aye [3:21] commissioner Kelly [3:23] aye commissioner Meadows [3:25] uh commissioner Nowak yes commissioner [3:28] sauce yes commissioner stopper yes [3:31] commissioner Thorpe aye Vice chair [3:34] arnrich aye chair Glover yes motion [3:37] passes unanimously okay thank you all [3:41] uh next item on our agenda is a will be [3:45] presented by Terry Ann [3:47] to adopt changes to physical year [3:51] 2023-24 publicly available pay schedule [3:55] and the authority salaries the benefits [3:59] and Compensation Plan for [4:02] June July 1st 2021 through 2024. [4:09] good evening chair and Commissioners [4:12] in June 2021 The Authority board [4:15] approved resolution 2135a sorry let me [4:18] turn my video on [4:23] Okay resolution 2135a adopting the [4:27] Authority's salaries benefits and [4:28] Compensation Plan for July 1st 2021 [4:31] through June 30th 2024 in April 2022 The [4:35] Authority board approved for revision [4:37] one [4:38] in March 2023 The Authority board [4:40] approved revision two this was to [4:42] support the accessible Transportation [4:44] strategic plan office of accessibility [4:46] and equity and creation of the [4:48] coordinating entity [4:50] actions consisted of adding a programs [4:52] manager and a contracts manager [4:54] classification [4:55] reclassifying one FTE from the director [4:58] of programs classification to the [4:59] program's manager classification [5:01] adding two ftes for the contracts [5:04] manager and one for the administrative [5:06] assistant classification and this [5:08] resulted in an increase of FTE positions [5:10] from 21 to 23. this item is brought [5:13] forth today to consider a further [5:15] revision to remove the 3.5 CPI cap [5:19] Consumer Price Index adjust the salary [5:21] ranges by 4.9 per percent for inflation [5:25] by the average 12-month December ended [5:27] percent change in the CPI add one FTE [5:30] position to the associate engineer [5:32] classification add one FD position to [5:35] the senior engineer classification and [5:37] this will result in an increase of FTE [5:39] positions from 23 to 25 for this fiscal [5:43] upcoming fiscal year further it [5:45] recognizes Juneteenth as a holiday and [5:47] reassigns the floating holiday in [5:49] February that is the holiday that is for [5:53] Washington and Lincoln's birthday we [5:55] still have the president's holiday and [5:57] that will be reassigned to the [5:58] Juneteenth holiday as a result of [6:00] assembly bill 1655. [6:02] we're doing a change to the bereavement [6:04] leave from three to five days and this [6:06] was a result of a b assembly Bill 1949 [6:09] and there's other administrative changes [6:11] such as adding a Mill and rest period [6:13] for all non-exempt employees and then [6:15] updating the authority stipend from 65 [6:17] to 100 dollars [6:18] these revisions align with the authority [6:20] of being an employer of choice we have a [6:22] high performing team of 20 people [6:24] eventually here will be 25. these [6:27] changes are approved annually by the [6:29] board as part of those approvals the [6:31] board makes the decision annually on the [6:32] CPI increases for staff so to be clear [6:35] regardless of what the CPI is in [6:37] December the board will still make the [6:39] decision on an annual basis basis as to [6:42] what percentage staff will receive [6:44] the proposed changes to salaries and [6:46] benefits are included in the fiscal year [6:48] budget it will account for 19 field [6:50] positions and six unfilled positions for [6:53] a total cost of 6.5 million which has [6:56] increased the budget by 478 388 by [7:00] adding the two new positions [7:02] the new positions will be funded by [7:04] grants and Regional funds like our like [7:06] Regional Measure 3 we will remain under [7:08] the one percent administrative cap and [7:10] we have no unfunded liability these [7:13] positions will be funded by projects and [7:14] will have minimal increases to the cost [7:16] under the one percent administrative cap [7:19] adding these positions will support the [7:21] projects Department with additional [7:23] Grant funded projects Regional Measure 3 [7:25] Grant funded projects and local agency [7:27] support and allows for succession [7:29] planning planning for funding and [7:31] programming requirements we will have [7:34] the capacity to take on additional [7:35] support for local agencies such as the [7:37] San Pablo multimodal Corridor project [7:41] if approved recruitments will be [7:42] conducted internally with the intent to [7:44] fill them this fall [7:45] staff seeks approval of resolution 2135a [7:48] revision 3 which will amend the [7:51] Authority's salaries benefits and [7:52] Compensation Plan for July 1st 2021 [7:55] through June 30th 2024 to remove the 3.5 [7:58] CPI cap adjust the salary ranges [8:01] effective July 1st by 4.9 percent add [8:05] one ft position to the associate [8:07] engineer classification add one FTE [8:09] position to the senior engineer [8:11] classification this will result in [8:13] increase of Ft positions from 23 to 25 [8:16] recognized Juneteenth as a holiday and [8:19] reassign the floating holiday in [8:20] February to Juneteenth change the [8:22] bereavement leave from three to five [8:23] days for eligible employees and approve [8:26] other administrative changes as noted in [8:27] the compensation plan that concludes my [8:30] presentation I'll answer any questions [8:31] that you may have thank you thank you [8:33] Terry [8:35] First Look to our boards see if there's [8:38] any comments or questions [8:41] I just made comment that again this was [8:44] at ABC [8:46] and just again historically there was [8:49] this cap that some we thought we were [8:51] wise in the past this agency doesn't do [8:54] colos [8:55] right most of the other agencies the [8:57] county it's automatic this is a year by [9:00] year basis obviously in the last year [9:02] was a unique year [9:04] and we wanted to have the board [9:07] consciously make the decision it also in [9:10] years of very low it creates a false [9:12] expectation that well oh it says three [9:14] and a half so this way it's up to us to [9:17] make that decision each year and I'd be [9:19] glad to make a recommendation to move [9:21] this forward and the two positions are [9:24] really needed we have so much on our [9:27] plate and the everything we're doing on [9:29] on 680 and even what now we might be [9:32] back on 80 for the next round [9:35] staff needs to help and and the fact is [9:37] the financial plan is solid it's Project [9:40] based so [9:42] yeah it's uh great when we as Project [9:45] based and as Grant [9:47] the dollar any other [9:50] comments members will now go out for [9:53] public comment is there anyone in [9:56] Rome today that wishes to address [9:59] okay uh Terry Ann do we have any [10:03] remote [10:05] public commenters [10:09] no public comment written or verbal [10:12] okay thank you [10:13] we will I will turn to [10:16] commission I'm rich I understand yeah [10:19] I'd be glad to make a motion and just a [10:20] big thanks to tarian to you [10:22] um your work with Brian on this and [10:24] particularly to Tim on the vision that's [10:27] built into this so this isn't just a [10:28] financial solution this is a vision of [10:30] our future so uh pleased to make a [10:33] motion as it's been presented tonight oh [10:37] okay I'd like to Second it and I just [10:39] want to say um no I completely agree [10:41] with you you know CCTA often acts um and [10:45] works like a a private firm and uh [10:47] having a cola for the this increase I [10:51] think is warranted [10:53] okay we have a motion by Andre second by [10:58] um [10:59] my colleague over here [11:01] [Laughter] [11:05] um is there [11:08] roll call vote please [11:10] commissioner Carlson yes commissioner [11:13] fideli aye commissioner Haskew yes [11:15] commissioner Kelly yes commissioner [11:18] Meadows aye commissioner Nowak yes [11:20] commissioner sauce yes commissioner [11:22] stuffer yes commissioner Thorpe aye Vice [11:26] chair arnrich hi [11:27] chair Glover yes motion passes [11:30] unanimously [11:31] hey thank you good job [11:34] um next item on our agenda today is [11:36] three-part action item [11:39] that will be presented by then Ramirez [11:43] on the State Route 4 my Colony bike [11:46] trail pedestrian overcrossing project [11:50] the first item is the uh and request to [11:55] increase the construction [11:57] allotment for the project [12:00] I've [12:04] [Applause] [12:06] it's good good evening chair [12:07] Commissioners Ivan Ramirez director of [12:10] construction [12:11] and these three items that I'm going to [12:13] talk about are all action items [12:16] but before [12:19] I do that I wanted to give you a little [12:21] a brief update of where the project is [12:24] right now when I came over here a couple [12:26] of months ago to talk about this project [12:29] even update it's progress was kind of [12:31] limited there was a lot of issues that [12:33] related to construction they're going to [12:35] talk about actually I gave you a [12:37] presentation about at that time but [12:40] since then given that the weather has [12:43] cleared up for us and a lot of the [12:45] issues have been put behind behind us [12:47] with the contractor progress has been uh [12:50] actually remarkable and I just wanted to [12:53] give you a couple of pictures that you [12:54] might [12:56] um so you can see by yourself so [12:57] everything that you see there that is [13:00] white that's concrete the contractor [13:02] went ahead in the last couple of months [13:04] uh form and poor what we call this the [13:07] stem and soffit and then on top of that [13:09] they went ahead and poured the deck so [13:12] progress is is very good I know some of [13:15] you if not all of you get a notice that [13:17] we're going to be closing Highway four [13:18] and uh that's actually a safety measure [13:21] the contractors doing they don't [13:23] necessarily have to close it but when [13:25] they're going to pour concrete did you [13:26] say let's let us shut the freeway down [13:28] and let's do it in the safest way [13:29] possible and as you can see I I [13:33] mentioned briefly last time about the [13:35] challenges coming up ahead and I talked [13:37] to you about that kind of like a hairpin [13:40] turn that they that we have to achieve [13:42] where it has a lot of tolerances in both [13:45] slopes going down and sideways in the [13:47] contractor is actually working on that [13:50] right now it Still Remains a challenge [13:52] but they're making progress [13:53] and I just want to say that you know [13:57] we're working very well with the [13:59] contractor now they're advancing the [14:01] project they're keeping a safe [14:03] environment and a clean site [14:06] so we are we have turned appears that we [14:09] have turned the corner as far as this [14:11] project is concerned so with that I'm [14:14] going to talk about the first action [14:16] item where we [14:19] assuming remember there was a little no [14:22] Prejudice they originally funded the [14:24] project by 11 million dollars and when I [14:26] came to you last time we knew we were [14:29] going to need additional money to finish [14:30] the project and we requested authority [14:32] to get an additional two million dollars [14:36] of letter not Prejudice from MTC we went [14:39] ahead and proceeded with that and they [14:41] actually gave us the two million dollars [14:44] so that that occurred last month there [14:46] was an action that it took like this [14:48] month so with that we're coming back to [14:50] you to today and asking you to increase [14:53] the construction allotment of the [14:55] project to 10 202 000 270 originally the [15:02] allotment that you approved [15:05] was 8 million 626 [15:08] 589 in 23 cents [15:11] so um [15:13] so that's the action that we're [15:15] requesting that you approve the [15:16] construction alignment increase [15:18] thank you Ivan and it's great to see [15:20] that that [15:21] the outlet cement now [15:25] um is there any Ford comments or [15:28] questions on this [15:30] and just make a clarification [15:32] just so it's really clear [15:34] we already sought for 2 million so the [15:37] MTC gave us that so the [15:39] 1.57 is out of that 2 million that we [15:42] already did because we anticipated that [15:45] that's it thank you [15:48] okay uh [15:50] any remote [15:54] communists [16:00] no public comment written or verbal okay [16:03] and I think I did open it up to the [16:07] boardroom here [16:09] okay see none um [16:11] the entertain a motion [16:13] most interproof [16:16] suck it [16:18] [Applause] [16:19] okay was that fidelity [16:21] okay who who is that for okay motion by [16:25] Thorpe second by medals [16:30] [Laughter] [16:34] okay uh we'll have a roll call vote [16:38] commissioner Carlson yes commissioner [16:41] fideli aye commissioner hascu aye [16:43] commissioner Kelly hi commissioner [16:46] Meadows aye commissioner Nowak yes [16:48] commissioner thoughts yes commissioner [16:50] stuffer yes commissioner Thorpe aye Vice [16:54] chair arnrich aye chair Glover yes [16:56] motion passes unanimously [16:59] okay thank you we'll go to the second [17:01] item which is a request to approve the [17:04] change order for the project Ivan please [17:07] present [17:09] I thank you chair uh you some of you [17:12] might remember the projects that we [17:13] encountered included a bird nesting to [17:15] get in the way of work included some [17:18] constructionist mess because the farmer [17:20] went ahead and formed the garlic and [17:22] they got wet we also had a issue with [17:24] conference getting the link losses [17:26] approved and more importantly than that [17:28] we had an issue with the actual [17:29] structure that really cost us a lot of [17:31] pain to get over so in we got together [17:34] with the contractor we knew we had [17:35] exposure we knew we had that we're [17:37] incurring additional costs for newer [17:39] Runway High schedule so we were able to [17:42] negotiate a change over 19 with a [17:45] contractor for one million 575 [17:48] 000 681 dollars as you say sorry and [17:52] um [17:53] the the this you know overall I think I [17:57] think this is the right move to get this [17:59] changer approved since since we're going [18:01] to be paying I think the contract was [18:03] going to be May hold again and that's [18:05] what we strive to do here to pay the [18:07] contractor where we owe them so uh the [18:10] amount that we're requesting is exactly [18:11] the amount that we're asking for that we [18:13] just approved for the construction allow [18:15] me so the increasing the allotment that [18:17] you just approved was directly to pay [18:19] the contractor for this change order so [18:21] with that um [18:23] the staff report has a summary of the [18:26] breakdown of the costs [18:27] and so you have an idea how we came up [18:29] with this cost [18:30] and uh so with that I'll be happy to [18:32] answer any questions [18:35] okay thank you are there any [18:37] commissioner questions [18:41] okay [18:42] um anyone in the chambers from the [18:44] public [18:47] Tyrion do we have any raised hands [18:51] no public comment verbal or written [18:54] okay [18:55] bring this back to the body for a [18:58] decision [19:02] promotion to prove second [19:04] okay [19:06] move by Third second by stepper roll [19:09] column please [19:10] commissioner Carlson yes commissioner [19:12] fideli aye commissioner Haskew yes [19:15] commissioner Kelly yes commissioner [19:17] Meadows aye commissioner Noah yes [19:19] commissioner stalls yes commissioner [19:22] stepper yes commissioner Thorpe [19:25] aye Feister arnrich [19:27] aye chair Glover yes motion passes [19:30] unanimously Okay the third item is a [19:34] request to approve an amendment for [19:37] additional program and project [19:39] management service for the project Ivan [19:43] will be present thank you chair so uh we [19:47] we hire goal management and Engineering [19:49] to help us manage the project do with [19:50] the construction management and [19:51] inspection and given the number of [19:54] issues that we have encounter and a lot [19:56] of [19:57] back and forth with the contractor [19:58] regarding submaros request for [20:00] information schedules [20:02] it has increased their cost [20:05] in addition to that there's more [20:07] overtime in addition to that we have [20:08] increased the length of the project so [20:11] all of that has also increased their [20:13] cost to get this project to completion [20:16] and we're asking the board to approve an [20:19] amendment with home management [20:21] engineering for an amount an increased [20:24] amount of 897 [20:26] 000 30.72 cents for a new Total [20:30] agreement value of 5 million 346. [20:34] 912.90 so with that I'll be happy to [20:37] answer any questions [20:39] okay thank you uh board member comments [20:42] the vice chair yes Ivan um this is I'm [20:46] fine with this but behind this um there [20:48] were design errors on this so recall [20:51] particularly on the three-dimensional [20:52] curvature they had all the elevations [20:54] wrong it got missed so do we expect to [20:57] see something come back um [20:59] on claim um for that do we expect some [21:03] resolution compensation or how is that [21:06] going to work out [21:08] the commissioner we have the the [21:10] executive director and I have had [21:12] discussions for the designer about the [21:16] issues that we have encounter I think [21:19] I'm gonna let the secret director talk [21:21] to it but I think they have acknowledged [21:22] some responsibility [21:24] so as we begin to close this project out [21:27] we're going to be continuing those [21:29] conversations with the designer see if [21:32] we can get some way to compensate us for [21:34] the additional cost because you're [21:36] absolutely right especially that deck [21:37] that's the most costly one that we have [21:39] all the issues and that's directly [21:42] attributable designer right and the way [21:45] it works I mean just to be clear [21:46] that if um if you're trying to figure [21:49] out what the cost difference is if you [21:50] designed it correctly [21:52] there's no extra cost they can design it [21:54] incorrectly and there's extra cost it's [21:57] pretty clear what that difference is [21:59] so while it's a small project the [22:01] implication on this for their design fee [22:03] it's actually pretty substantial as a [22:05] percentage so you know it's the cost of [22:08] doing business but in the the technology [22:12] that we have and the computer generation [22:15] they didn't do this in 3D them or [22:18] anything because this can't happen in [22:20] that system [22:21] so um you know maybe it's something for [22:24] us to require a little bit higher [22:26] standard [22:28] um in since they're doing all [22:29] computer-aid computer-aided drafting [22:31] Design Systems those systems alone would [22:34] prevent this if it was done as a 3D [22:36] modeling [22:37] so I would hope that maybe in the future [22:39] we can take this lesson apply it but um [22:43] you know I hope to see this come back to [22:45] us and see what resolution we'll have so [22:47] thank you [22:48] another common if you don't mind so [22:50] regarding the faces one two a and four [22:53] the work is currently on the design [22:54] there I think I mentioned also that in [22:56] that April we're actually going to come [22:58] back to you and ask for additional [23:00] budget because we're implementing bam [23:02] and and Bim is you know you spend money [23:05] up front it's a great investment up [23:06] front but hopefully like commission [23:09] honors was saying you you kind of [23:12] minimize uh any impacts in the field [23:14] because you're able to catch a lot of [23:15] things up front so we're actually [23:17] working on that right now for our future [23:19] projects it's part of the qap that we [23:22] you approved a couple years ago or so so [23:25] we're very much focused on specifically [23:27] avoiding these kind of issues in the [23:29] future [23:30] Ivan you're always on it thank you [23:33] thank you no other commissioners [23:36] okay we will ask that uh public that's [23:40] in the chamber if there's any comments [23:44] seeing that do we have any remote [23:49] no public comment written or verbal [23:52] okay bring it back to the board [23:55] it wasn't to approve and I'll second [23:58] okay we have a motion by Thorpe second [24:02] by Kelly [24:03] broke our vote please [24:08] commissioner Carlson yes commissioner [24:10] fideli aye commissioner Haskew yes [24:13] commissioner Kelly yes commissioner [24:15] Meadows [24:17] aye commissioner Nowak yes commissioner [24:19] sauce yes commissioner supper yes [24:22] commissioner Thorpe [24:25] aye Vice chair arnrich aye chair Glover [24:28] yes motion passes unanimously [24:31] okay thank you we'll move to our next [24:34] item which is an informational update [24:36] that will be be provided by Stephanie [24:40] who on the East County Dynamic personal [24:45] microtransit project [24:50] welcome Stephanie [24:57] you can see okay perfect [25:00] um good evening chair and Commissioners [25:01] my name is Stephanie who director of [25:02] projects at CCTA this is an [25:05] informational item to provide you an [25:07] update on the dynamic personal [25:09] microtransit or dpmt project [25:14] um the dpmt project is a closed micro [25:16] transit system consisting of a small a [25:20] fleet of small personal driverless [25:22] electric Vehicles operating on demand in [25:25] a dedicated guideway either elevated or [25:28] at grade each ride is to be ordered per [25:31] party so there's no ride sharing the [25:33] writer will order the ride via an app or [25:36] at a kiosk that will take them where [25:38] they need to go without any intermediate [25:40] stops [25:41] we aim to have the system to be run on a [25:44] financially sustainable model so the [25:46] cost of each ride would be comparable to [25:48] what people pay for Transit today [25:51] the project aims to tackle these Transit [25:54] priorities in East County improving [25:56] Transit experience for the users [25:58] providing transit services that are that [26:01] have Equitable access supporting [26:03] economic development in East County by [26:05] increasing Mobility preparing the future [26:07] in of transit connect Transit technology [26:11] showing the public the benefits of [26:13] transit to encourage most shift and [26:15] Transit use and improving connection to [26:19] some advantages of dpmt are that the [26:22] potential to generate economic [26:24] development in the East County the dpmt [26:26] vehicles are to be zero emission [26:28] Vehicles so that supports the climate [26:30] goals that the state has to reduce ghg [26:33] emissions it will provide greater [26:35] Transit accessibility and for the [26:38] disadvantage disadvantaged communities [26:40] in East County and it complements fixed [26:42] route Transit as a potential first mile [26:45] Last Mile connection it can be [26:47] constructed costs effectively given its [26:50] small footprint and each ride is on [26:52] demand and it's a private ride so the [26:54] ride experience is personalized and safe [26:57] for the users [26:59] in 2021 the East County cities and the [27:02] county collaborated and conducted a [27:04] feasibility study to assess the [27:06] viability of a dpmt project in East [27:09] County the study assumed glideways [27:11] technology but we know there are other [27:13] technology vendors that can Implement a [27:15] dpmt project the study develop a [27:18] conceptual routing plan and also [27:19] evaluated the feasibility of of [27:21] attracting private financing and Public [27:24] Funding to deliver the project and the [27:27] study determined that public-private [27:29] partnership or P3 would be or could be [27:32] feasible [27:34] some key parameters that we're looking [27:35] for for the dpmt project are that the [27:38] system be operated On Demand with short [27:40] waiting times and that dpmt is a [27:43] personal ride so each ride is for one [27:45] party to get them from point A to point [27:47] B and then there may be potential of [27:50] having the flexibility for the users to [27:52] choose to pick up other Riders if [27:53] desired the system is to be fully [27:55] autonomous and operated with zero [27:57] emission Vehicles since we'll be [27:59] pursuing Federal funding the elements in [28:02] the system will need to comply with [28:03] Federal made America rules and also Ada [28:06] accessible we're looking for a system [28:08] with smaller vehicles that are fully [28:10] separated from traffic with dedicated [28:13] space and it would need to be operating [28:16] in both directions separately and it can [28:18] be operated at grade or grade separated [28:20] the technology can be different than [28:22] what was assumed in the feasibility [28:24] study [28:26] in terms of delivery since the [28:28] completion of the study try Delta [28:31] Transit and CCTA staff have been [28:33] collaborating on how to deliver the dpmt [28:35] project using design Bill Finance [28:38] operate and maintain P3 model we [28:40] conducted an industry Outreach Day in [28:43] February of last year which had really [28:45] good turnout and we received some useful [28:46] feedback from the industry with the [28:49] feedback Authority and try Delta staff [28:51] we find our delivery strategy using P3 [28:53] model that includes procuring a [28:56] developer team [28:57] and last July the authority board and [28:59] tried Delta Transit executed at mou that [29:02] defined roles and responsibilities of [29:04] the two agencies including collaborating [29:06] to advance the project using P3 if it's [29:09] financially feasible develop procurement [29:11] documents and joining negotiate contract [29:14] and contract with a P3 developer team [29:18] so the dpmt project is part of the new [29:22] ccj 4.0 Vision that our executive [29:24] director had laid out a few months ago [29:26] the vision builds upon the Innovative [29:29] framework that our agency has already [29:31] established and aims to expand ccta's [29:34] role to include operations and [29:36] maintenance county-wide similar to the [29:40] Presto shuttle and innovate 680 the dpmt [29:43] implementation will expand CT ccta's [29:45] role in in the O M world or in [29:48] partnership with Tri Delta Transit for [29:50] this project [29:52] the authority and try Delta will be [29:54] managing entities and partners on [29:56] Project implementation both CCTA and try [29:59] Delta will work with a P3 developer team [30:01] on the project development construction [30:03] and operations [30:06] so CCT and try Delta release an RFP in [30:10] November to procure a developer team [30:12] consisting of a P3 developer and a [30:14] technology partner to perform three [30:16] initial phases of work and this team [30:19] would be formed with designated roles [30:21] that can access a range of funding [30:22] opportunities and to navigate the [30:24] funding and P3 constraints the initial [30:27] three phases of work will be the scope [30:29] of work under the system pre-development [30:31] agreement or spda which CCTA and try [30:34] Delta Transit will jointly enter into [30:36] with the developer team [30:39] the spta spda will cover three phases [30:43] and it's a first step of our delivery [30:46] approach the first and second phases [30:48] will be at no cost to the authorities [30:51] both CCTA and the development Tri Delta [30:54] the developer team is to do this work in [30:57] phases one and two at their own risk [30:59] without payments from us phase one will [31:02] include identifying a viable initial [31:05] segment where the design construction [31:07] and the long-term o m can be funded [31:09] through a combination of grant funding [31:11] and revenues they would identify a [31:13] technology solution that can operate the [31:16] dpmt system they would review the [31:19] assumptions made in the feasibility [31:20] study and the team will propose to CCTA [31:23] and try Delta in an approach and a cost [31:25] estimate for completing the [31:26] environmental review for this first [31:28] segment and the programmatic approval [31:31] for future segments of dpmt [31:33] phase two will include beginning [31:35] environmental scoping of the initial [31:37] segment and applying and obtaining funds [31:40] needed to proceed to the phase three and [31:42] future implementation phase [31:45] if you're successful in obtaining grant [31:47] funding in Phase 2 the developer team [31:49] will proceed to phase three under the [31:52] spda phase 3 will be Grant funded and [31:55] the work includes advancing the design [31:57] of the initial segment to 30 percent [31:59] including system engineering of the [32:01] technology that will be used and [32:03] identifying right-of-way needs [32:05] completing SQL NEPA clearance for the [32:07] first segment or initial segment and [32:09] conducting investment grade ridership [32:11] and revenue analysis the work in the [32:14] first three these three phases again is [32:16] covered under the system pre-development [32:18] agreement or spda and that will be [32:21] executed by ccca Tri Delta with the [32:25] selected team [32:27] at the end of phase three that's covered [32:29] by the spda and if the initial segment [32:32] is still determined to be financially [32:34] feeable feasible we will enter into a [32:37] second step where the authority and try [32:39] Delta will negotiate with the developer [32:41] team and execute a system development [32:44] agreement or SDA [32:46] the implementation phase will include [32:49] the completion of final design for the [32:51] five the first segment obtaining any [32:54] right-of-way permits or approval and [32:56] then constructing this initial segment [32:58] and the negotiation of the SDA may [33:01] include future segments of the dpmt [33:03] system [33:05] so because [33:07] this is very specialized work and this [33:10] is alternative delivery with P3 we've [33:12] had several rounds of one-on-one [33:14] meetings or negotiations that were held [33:16] with prospective developer teams after [33:19] we released the RFP between November and [33:22] may where we sought input from the uh [33:26] the prospective teams about our delivery [33:28] structure phasing and also get comments [33:31] from them on the draft RFP and SPD [33:34] some major discussion points were first [33:37] developing a work plan that outlines the [33:39] responsibilities for the authority staff [33:41] and also the developer team and also who [33:44] will take lead on some Key activities [33:47] um there are also discussions about the [33:49] no payments to developer team for phases [33:51] one and two work both CCTA and try Delta [33:55] were very firm on this because we do not [33:57] have any funding for the project at this [33:59] time and so to be clear again phase one [34:01] phase two does not cost the authorities [34:03] um anything [34:04] um the developer team will be taking [34:06] those tasks on at their own risk and [34:09] even if we are successful in getting [34:11] grants to advance to phase three the [34:14] authorities will not be paying work done [34:16] in Phase One and phase two first because [34:19] grant funding that we would hopefully [34:21] get in four phase three work would be [34:23] for phase three work and then also grant [34:25] funding isn't normally doesn't allow us [34:27] to pay for work that's already been done [34:30] prior to Grant award and also if the [34:34] authorities terminate the agreement [34:35] there will also be no payments for phase [34:38] one and phase two [34:40] another topic that we discussed was the [34:42] request for exclusivity by the [34:44] prospective teams to mitigate the risk [34:47] this request was not a huge one a huge [34:50] risk for the authorities so the [34:52] authority ends the Contra for any reason [34:54] we will not undertake another dpmt [34:57] project in East County for 12 months [34:59] this lowers the risks for the developer [35:02] team and then also signals to the [35:04] proposals that the authorities are [35:06] committed and serious about advancing [35:08] the project with the selected team [35:10] lastly there are discussions and [35:12] confirmations about the Authority's [35:14] commitment of staff's time on the [35:15] project again because the developer team [35:18] is working at risk for the first two [35:19] phases they want to be insured that our [35:22] staff CCT staff and try Delta staff are [35:25] going to be actively engaged on the [35:27] project so with the comments we received [35:29] through these one-on-one meetings we [35:31] were able to find our procurement [35:32] documents and then we issued refinements [35:36] to our documents through several addenda [35:39] so moving forward looking forward in [35:41] terms of timeline the proposals were due [35:43] June 2nd we're wrapping up our major [35:45] procurement activities this week so I [35:47] will not go into the details of the [35:49] selection of the team today we will be [35:52] seeking concurrence and approval of the [35:54] spda from the Tri Delta board next week [35:57] staff will come back to this board for [36:00] execution of the spda in July and the CC [36:03] the Tri Delta board will execute the [36:06] contract after we execute next month [36:10] and with that be happy to take any [36:12] questions I wanted to acknowledge Branch [36:15] butson he is our P3 attorney from [36:18] Kathleen Kirsch and Rockwell he's on the [36:19] call in case there are questions that he [36:21] may be able to answer with that that [36:23] concludes my presentation [36:25] hey thank you Stephanie this is really [36:27] exciting stuff [36:30] um so I'll turn to my [36:32] colleagues [36:34] board member is supper all right [36:37] um thank you is it as exciting everybody [36:39] at the conference wanted to get in that [36:42] car and see how they looked in it and [36:44] how they would ride and so I'm just [36:46] going to limit it to that overall view [36:48] so I know that um you know I'm kind of [36:51] representing San Ramon here too and that [36:53] they had a little delay in the bird [36:55] project because they were the scooters [36:57] weren't where they needed to be and how [36:59] many you needed to have at one point in [37:01] time so what happens with these cars [37:03] you've got Danville with 45 000 people [37:06] how many of those do you have to have [37:08] around to be able to have 10 people five [37:12] people go to the doctor or school at 10 [37:14] o'clock in the morning do they have [37:16] several of these because it's a personal [37:17] vehicle right yeah I think that depends [37:20] on the segment the initial segment that [37:22] we'll be tackling [37:24] um and I'm sure through the analysis [37:26] they will provide the adequate vehicles [37:29] to support the ridership for that [37:32] segment which is not yet known at this [37:34] time that's all work that will be done [37:37] in this initial phase or sorry phase one [37:39] is San Jose experiencing this right now [37:42] they're they're also in the development [37:45] stage right yeah it's familiar with the [37:48] San Jose project and where they are at [37:50] um I'm just looking for somebody maybe [37:53] that's tried it yet or are we first yeah [37:55] what do you say first whoa [37:58] yeah all right I think that project is [38:00] the airport [38:02] it's not quite as having enough [38:04] disservice so that people want to keep [38:07] taking this yeah so I think that's part [38:09] of the analysis and as they study that [38:12] first segment who of course have enough [38:14] vehicles to serve the ridership Tim [38:17] thank you maybe I can just add so what [38:20] the the way the system's preliminary [38:22] development where we laid out is based [38:24] on user requirements and quality of [38:26] service so basically what will happen is [38:29] the system provider or the operator [38:30] would have to provide whatever number of [38:32] vehicles are required to meet them the [38:34] the user requirements so for example you [38:37] know as we go through our analysis and [38:39] this will determine on how to how it'll [38:40] actually pencil out from a funding and [38:42] revenue standpoint cost the revenue [38:43] standpoint but let's say for example we [38:46] want to make sure we have headways of [38:48] you know every 10 minutes you know in [38:50] the system right so based on analysis [38:53] and based on demand they would have to [38:55] provide whatever number of vehicles [38:56] whether that be 100 vehicles or 200 [38:58] Vehicles right and that'll all be [39:00] determined on how you pencil out the [39:02] operating cost versus the revenue when [39:04] we go through this kind of initial phase [39:05] to make sure it's to make sure it's a [39:08] feasible project in phase one before we [39:10] actually move to subsequent phases [39:14] picks number robots yeah oh okay thank [39:18] you thank you [39:20] thank you [39:23] uh board member know it I I just had a [39:25] question I I heard the concern on not [39:28] funding for phase one and two were we [39:30] happy with the number of proposals that [39:32] we received from Developers [39:38] we're still in the I I'm hesitant to say [39:42] because we're still we haven't wrapped [39:44] it all up so that's why we were hoping [39:46] this was informational item to prepare [39:48] you all for the next month's action I I [39:51] thought they were due by June 2nd yeah [39:54] they were due in June 2nd we met to [39:56] panel and evaluation so yeah so you're [39:59] not quite cool yeah otherwise today for [40:02] Action so if I could answer that [40:05] question next month okay maybe public [40:07] information this time laughs [40:10] but I've asked about the deadline was [40:12] over I just didn't want to get ahead [40:13] just in case I will remember your [40:16] question and we'll answer it ask again [40:18] otherwise [40:21] I just want to run in trouble with any [40:22] laws [40:24] okay member of fidelity and then um [40:27] Kelly so personal means one [40:32] singular party like I can get a ride [40:35] with two people I'm a single party sorry [40:38] family of four yes yes yes what about a [40:41] bike yeah there will be room right yeah [40:43] I've seen pictures one black bike not a [40:47] cohort and I saw the East County is [40:49] there a proposed route this time or is [40:52] this just a general yeah the map that [40:54] you saw was from the feasibility study [40:56] along where [40:58] um it was to connect any of the keys [41:00] right by your house okay sure [41:03] commissioner yeah [41:05] um it was conducting major activity [41:06] centers and um schools but they have not [41:09] it was a concept so parallel following [41:13] Bart too [41:14] um I [41:16] um they canned there's no there is no [41:19] definite defined route right now this [41:21] could be a first one okay okay great [41:23] thank you [41:26] remember Kelly [41:28] um Stephanie thank you for your [41:29] presentation and this is very very [41:31] um very exciting [41:33] um and these um little dpmts they'll run [41:37] on their own track so to speak right [41:39] yeah their own pavement [41:41] um designated a dedicated space not [41:43] share not share with mixed flow traffic [41:46] or right and then there won't be traffic [41:48] crossing over there they would need to [41:50] either find a way to go over or under [41:53] okay and I know we're just in the [41:55] beginning stages right now but do we [41:56] have any idea how long phase one and [41:58] phase two might take you mean in time [42:01] yeah yeah [42:02] um yeah we anticipate to be six to nine [42:04] months understanding that developers are [42:07] doing this for free at risk we couldn't [42:09] go on forever so okay so not five years [42:12] right no I mean I don't know [42:14] sooner rather than later so yes of [42:17] course I think we also need to in that [42:19] time assess Financial [42:22] feasibility of course but yeah we don't [42:24] anticipate one phases one and two to be [42:26] years right and as I understand it if [42:29] this actually gets produced um that [42:32] people will be paying for these rides [42:34] right it's not going to be free it's not [42:36] like Disneyland [42:37] oh Disneyland [42:40] I mean once you get on the ride okay [42:43] thank you very different definitions for [42:46] free [42:49] yeah [42:51] okay [42:53] um [42:54] any member any public members in the [42:56] board chamber [42:58] Mr Olsen [43:01] thank you [43:03] Bruce Olson East Contra Costa's Mr [43:06] bicycle I have two concerns number one [43:09] we don't want to lose any existing bike [43:13] Lanes to the dedicated glideway and [43:16] number two [43:18] um there aren't that many utility [43:20] corridors out there and we have paths on [43:24] many of them these paths are used by [43:27] mother [43:36] um [43:36] but I kind of want to say right now we [43:39] don't want to share it until [43:41] I cannot see that but the more the [43:45] faster these [43:49] and they could shut off Darion [43:51] it Terry don't it shut off [43:57] it was on and it just stopped batteries [44:06] yeah use this yeah [44:10] so [44:12] where should I start over [44:15] all right just shut up [44:17] you don't want to share [44:18] well it's on okay [44:23] um not not wanting to share is a little [44:26] strong [44:28] expression of concern [44:32] um [44:33] utility corridors are in limited Supply [44:37] out there we have bike paths and [44:40] pedestrian paths on these corridors uh [44:45] parents pushing baby carriages uh [44:49] parents trying to teach their [44:51] five-year-old how to ride a bicycle if [44:54] we have one of these [44:57] autonomous vehicles racing down our [45:01] utility Corridor the uh those parents [45:05] and young children might just evaporate [45:08] because they're afraid I'm I am [45:12] expressing concern here another thing to [45:16] be concerned about would be are we going [45:18] to share our new bridge over the highway [45:23] 4 this one we're spending more than 13 [45:26] million dollars on [45:29] um it wasn't designed to have autonomous [45:32] vehicles on it we'll share maybe when [45:36] they go over this uh our our new our [45:40] lovely new wonderful Bridge uh they [45:43] could go at the pace of a uh walking [45:47] person [45:48] it is a nice utility Corridor and uh I I [45:54] think I'll stop there thanks very much I [45:56] too am very interested and uh think this [46:01] is a great idea and it should be pursued [46:03] thank you very much [46:07] any other public members and board [46:11] Chambers [46:13] okay [46:15] Tyrion do we have any public remote [46:25] no public comment verbal or written [46:28] okay thanks again Stephanie this is a [46:31] informational item so there's no action [46:35] we'll move to the next item on the [46:37] agenda which is also an informational [46:40] item from the planning committee [46:43] to be introduced by Matt Kelly [46:45] on the San Pablo Avenue [46:49] multimodal Corridor study phase two [46:53] Welcome Matt and I think you have some [46:56] guests I do thank you chair Glover good [46:59] evening uh Authority board members Matt [47:02] Kelly senior Transportation planner with [47:04] CCTA I'm very happy to be here tonight [47:07] to present uh findings from the San [47:11] Pablo Avenue multimodal Corridor study [47:13] specifically phase two but I wanted to [47:16] give you a little background before I [47:18] turn it over to our presenter on the [47:21] phase one uh which started back in 2017 [47:26] CCTA and WIC Tac are our regional [47:30] transportation planning committee out in [47:31] West County decided to partner with [47:34] Alameda County Transportation Commission [47:37] in order to conduct a study of all modes [47:41] on San Pablo Avenue it's kind of the [47:44] main street through West Contra Costa [47:47] and Western Alameda County [47:49] and look at how we could best facilitate [47:53] as many modes as possible but really [47:56] focusing on active Transportation bikes [47:59] and pedestrians as well as Transit and [48:02] how we could provide better access to [48:05] those modes as well as move them uh you [48:08] know where they want to be in the court [48:09] or a little easier and faster hopefully [48:13] so the phase one work [48:16] was led by Kimberly horn I have Adam [48:19] dankford from Kimberly horn here today [48:22] they they did all the work for both [48:24] counties [48:26] once we did that initial look at the [48:30] corridor looking at existing conditions [48:32] what does it look like today what is it [48:34] going to look like in 2040 and then how [48:37] can we improve those 20 40 conditions so [48:41] once we kind of took that initial look [48:45] um [48:45] we decided that we needed to do some [48:48] more work in Contra Costa County really [48:50] because [48:52] uh San Pablo Avenue in in in Contra [48:55] Costa County varies uh in width as you [48:59] go down the corridor it may be uh 78 [49:02] feet or 72 feet in one spot and then 88 [49:06] feet uh you know a couple blocks down so [49:09] that really affects what you can do with [49:11] that right-of-way when you're talking [49:12] about trying to accommodate these [49:14] different modes so we decided to use [49:16] phase two to really look at uh different [49:19] uh segments of the corridor and really [49:21] see what might be possible in the Contra [49:23] Costa segment [49:25] and so we've now completed phase two uh [49:29] We've uh we've presented this to the WIC [49:33] attack board in January and what we're [49:36] going to do here today is present the [49:38] findings from phase two and really what [49:40] we presented to the whiptack board and [49:42] what they approved in January we don't [49:45] have a action for you tonight we really [49:47] just want to Daylight this study and the [49:49] findings from it because uh we think [49:51] it's it's pretty exciting stuff so I'm [49:54] going to turn it over to Adam dankberg [49:55] and have him uh you through [49:59] our findings here [50:07] share my screen here [50:27] we go let's go ahead welcome Adam [50:30] thank you very much good evening I'm [50:33] Adam denkberg with Kimberly horn the [50:35] project manager for this project it's a [50:37] pleasure to be here tonight speaking [50:39] with you all [50:41] um [50:43] there we go okay I'll cover some [50:45] background on the study some key [50:47] findings and then some options on where [50:50] to proceed next [50:53] so back when we started the study [50:55] several years ago there's a effort and [50:58] process to identify the goals and [51:00] purpose of the effort so some of the key [51:02] items include accommodating growth and [51:05] supporting Economic Development the [51:06] corridor improving the quality and [51:08] comfort of trips and particularly safety [51:10] for all users in the corridor [51:12] and promoting Equity an equitable [51:14] Transportation options in the corridor [51:17] so we started this effort back actually [51:20] in 2017 the corridor study extended all [51:23] the way from the southern limits of San [51:24] Pablo Avenue in Oakland to Hilltop Mall [51:27] in Richmond [51:29] um it was led by Alameda CTC but there [51:31] was close partnership with Wake Tech and [51:33] CCTA throughout that process it was a [51:36] multi-year effort where we did existing [51:38] conditions analysis concept developments [51:40] modeling and we actually had a couple [51:41] rounds of public engagement and surveys [51:45] at the conclusion of that effort Alameda [51:48] CTC felt like they had some clear [51:50] Direction understanding of where Alameda [51:52] County wanted to proceed but as Matt [51:54] mentioned there is less Clarity in [51:56] Contra Costa County because of the [51:58] variety and conditions in the corridor [52:01] both in travel Behavior as well as [52:03] geometric conditions I mean so this [52:05] effort was developed to really focus [52:07] more on the Contra Costa County portion [52:10] before deciding what to proceed with [52:12] next [52:13] so some of the elements we looked at in [52:15] phase two include the geometric [52:16] feasibility of different options looking [52:19] at parking and bike lane implications a [52:22] particular focus on safety and [52:23] identifying near-term Solutions we [52:26] looked at traffic implications and we [52:28] had several presentations with the WIC [52:30] attack board as well as the various City [52:32] councils along this Corridor um it [52:35] covers the cities of San Pablo Richmond [52:37] and El Cerrito [52:40] so a brief background for those not as [52:43] familiar with the corridor there [52:44] actually is quite a frequent bus service [52:46] today so south of McDonald there's buses [52:49] every seven minutes in this Corridor so [52:51] quite a bit of bus service [52:53] um there are some bike Lanes but only in [52:55] short stretches of the corridor but one [52:57] of the challenges is for pedestrian [52:59] circulation there's some long gaps [53:01] between safe and comfortable Crossings [53:03] this Coral particularly in El Cerrito [53:05] and one thing that we found actually [53:07] early on in the project is that a lot of [53:09] the people using San Pablo Avenue don't [53:11] have a destination or a trip origin on [53:13] San Pablo they're just passing through [53:14] 80s busy and they choose to get on San [53:17] Pablo Avenue because they think it'll be [53:19] faster and so there are some [53:21] opportunities then in terms of how to [53:23] reuse the space Maybe to discourage them [53:25] that pass through and and also to try [53:27] and convert some of those Auto trips to [53:29] Transit [53:32] some of the challenges in the corridor [53:33] are associated with that congestion so [53:36] in that chart on the right um the red [53:38] portion of the bar chart and it shows [53:40] total travel time for the bus the red [53:42] portion is the time the bus spends in [53:44] congestion and you can see it actually [53:45] spends more than half of its time stuck [53:48] in congestion and not even moving or it [53:50] stops and what we found is if you do [53:52] nothing on this Corridor that amount of [53:54] traffic delay will increase by 69 [53:55] percent by 2035 and so conditions for [53:59] the bus will worsen as well the other [54:02] major issue is safety so there are 293 [54:06] injuries or fatalities in a recent [54:08] five-year period 73 of those involve [54:10] pedestrians or cyclists including three [54:12] fatalities on this Corridor and so that [54:14] really underscores the need for looking [54:16] at solutions to enhance safety [54:17] particularly for those most vulnerable [54:19] users [54:21] the bus system is well utilized today a [54:24] total of 12 500 daily bus riders this [54:27] was a pretty pandemic about half of [54:29] those are in Contra Costa County so [54:32] um sort of the adage of you know maybe [54:33] it's just the Oakland people or the [54:34] Berkeley people on the bus actually [54:35] there is quite a bit of bus ridership in [54:37] Contra Costa County in this Corridor uh [54:39] there are more Riders on the 72 series [54:41] that operates on this Corridor than any [54:43] other AC transit route and about 14 in [54:46] the tire system ridership we wanted to [54:48] underscore some of the key Equity [54:50] components of this Corridor [54:52] um over three cores of the passengers [54:53] are non-white over half make less than [54:56] 50 000 per year and almost 100 93 of the [55:00] study areas within a quarter mile of MTC [55:03] designated Equity priority community so [55:06] a lot of considerations for that in this [55:08] corridor [55:10] so we looked at a variety of options of [55:12] how we could improve Transit on San [55:14] Pablo Avenue and there's a wide Suite of [55:17] options ranging up to bus Rapid Transit [55:19] which is sort of the catch-all for many [55:21] of these enhancements we did several [55:23] presentations the wig tech board about [55:25] some of the different options and [55:26] configurations I won't go into all that [55:28] here tonight but there are a variety of [55:30] strategies and solutions for improving [55:32] trains in this corridor [55:34] if you were to proceed to uh what would [55:37] be considered bus Rapid Transit there [55:38] are a couple different options to do so [55:40] one is Center running bus lanes picture [55:43] on the left is Van Ness in San Francisco [55:44] so that may look familiar a picture on [55:47] the right is actually the recently open [55:48] Tempo uh brt in Downtown Oakland in [55:52] order to place uh dedicated trains at [55:54] Lanes on San Pablo Avenue there would be [55:56] a need to convert one of the auto Lanes [55:58] to bus only there's also an opportunity [56:01] to provide bike Lanes on the corridor [56:03] and in order to do so you need to [56:04] convert the existing parking to bike [56:06] Lanes so you could put the buses in the [56:09] middle of the street you can put the [56:10] buses on the side there's a lot of [56:11] trade-offs between those options but [56:13] either way it would need to require [56:15] converting a travel Lane [56:18] so a couple of the key findings that [56:20] we've found as part of the studies first [56:22] first focusing on Transit we found that [56:25] providing these dedicated Transit Lanes [56:26] would provide very significant benefit [56:28] to travel time so 30 to 45 percent [56:30] benefit and travel time for the bus and [56:32] bus riders [56:34] um Center running does perform a little [56:35] better than side running about 10 faster [56:37] however side running is easier to [56:39] implement just fewer implementation [56:41] challenges easier faster to implement [56:44] can be used by a wider variety of bus [56:46] routes but Center running does provide [56:49] some additional benefit for providing [56:50] both bus and bike on this Corridor [56:52] because it's a bit more efficient use of [56:55] space [56:56] so what we heard when we gave this [56:57] presentation went through all the [56:59] trade-offs with the Wake Tech board and [57:00] the various cities is there was [57:02] widespread support for enhancing Transit [57:03] the concept of enhancing Transit but [57:06] there was mixed feedback and reaction in [57:09] terms of do we go big Center running big [57:12] large-scale project or something smaller [57:15] more near-term and there's also some [57:18] concerns about the impacts of us on my [57:20] way and whether it be on traffic or [57:21] access [57:23] so definitely it's a mixed reaction [57:25] in terms of bikes we found the bike [57:27] lanes are feasible to be implemented but [57:29] it would require parking removal as I [57:31] had noted parking is currently very [57:33] plentiful and not particularly well [57:34] utilized in most of the corridor but the [57:37] nature of the corridor is changing over [57:38] time is more dense development comes in [57:41] one thing we've flagged though is [57:43] providing a protective bike facility [57:44] here would still result in high level of [57:46] traffic stress because there's so many [57:48] right turns there's so many driveways so [57:50] many intersections on this corridor so [57:52] what we heard on the bike topic is a uh [57:55] also mixed reaction but more so on [57:58] whether bikes facilities should be on [57:59] San Pablo Avenue itself and dedicate the [58:01] space on the Avenue for it or a bicycle [58:04] facilities should be on parallel streets [58:06] portions of the corridor have good [58:08] parallel streets that could be used [58:10] portions do not and there was some [58:12] concern about the removal of the bike [58:14] the parking for the bike facilities [58:18] um and then finally uh pedestrians [58:20] um there is a lot of concern that we [58:23] heard around the safety conditions on [58:24] the corridor there is some particular [58:26] concern raised for elderly and Mobility [58:28] impaired pedestrians on the corridor we [58:31] had identified some specific safety [58:33] Improvement opportunities and those were [58:36] really well received there's a lot of [58:38] support we heard from all the cities and [58:40] the board in terms of the need to [58:42] improve pedestrian safety on this [58:44] corridor [58:47] so in terms of Next Step options [58:50] first before diving into what uh what [58:53] can be feasible in Contra Costa County [58:55] many as as we've gone through these [58:57] presentations found it to be helpful to [58:58] understand what Alameda County is doing [58:59] on San Pablo Avenue just south of the [59:02] County border [59:04] um so Alameda County is currently [59:05] advancing Alameda County Transportation [59:07] Commission is currently advancing three [59:09] projects on San Pablo Avenue one is a [59:12] series of safety enhancements in [59:13] Berkeley and Albany that are focused on [59:16] pedestrian safety spot improvements to [59:18] improve Crossings of the corridor and [59:20] overall pedestrian and bike safety [59:22] conditions [59:24] the second is to provide bus and bike [59:26] Lanes on San Pablo Avenue so the lane [59:28] conversion that I talked about earlier [59:31] and that would be in Oakland Emeryville [59:33] and South Berkeley that includes uh also [59:36] safety improvements in another Crossing [59:39] improvements and then thirdly in in [59:42] Albany and Berkeley where there would [59:44] not be the bike project on San Pablo [59:46] Avenue there will be improvements on the [59:48] parallel Network that doesn't close the [59:50] door on continuing the bus lane and bike [59:52] lane on San Pablo to the County border [59:54] but the immediate Focus was on these [59:56] near term parallel Network improvements [1:00:01] so that said the a couple elements or [1:00:04] options were presented to the WIC Tac [1:00:06] board element one or these are kind of [1:00:09] packages of projects are ways to proceed [1:00:10] element one is multimodal safety [1:00:13] improvements and so these would be a [1:00:15] series of spot improvements to improve [1:00:17] pedestrian safety on the corridor [1:00:20] um some work would still be needed to [1:00:22] figure out exactly what those projects [1:00:24] would be and the WIC Tac board and with [1:00:27] tech staff has requested CCTA to serve [1:00:30] as a design and implementation lead for [1:00:33] that effort given the additional history [1:00:35] and experience with implementation for [1:00:37] CCTA relative to Wake Tech [1:00:40] money is still needed for outreach [1:00:42] design construction of these facilities [1:00:44] but there is a clear and present need [1:00:47] that the board and various cities have [1:00:50] identified for these safety improvements [1:00:52] element two is uh was the providing a [1:00:56] bus lane demonstration project on a [1:00:58] portion of the corridor and the board [1:01:00] felt that continued discussion was [1:01:01] needed in order to further flesh out [1:01:04] this type of project and understand the [1:01:07] level of support for this type of [1:01:08] project [1:01:09] so diving into each of these a little [1:01:11] bit greater detail [1:01:13] so element one is the priority safety [1:01:15] improvements there will be a wide [1:01:17] variety of pedestrian safety [1:01:18] improvements we have a map that was in [1:01:20] the presentation we gave to the WIC [1:01:21] attack board that showed potential [1:01:22] locations for these but things like [1:01:24] signalized Crossings New median beacons [1:01:27] better striping better lighting [1:01:28] accessibility upgrades curb ramps and [1:01:31] accessibility improvements bulb outs [1:01:33] improved safety and improving the bus [1:01:36] stops on bus stop access from the [1:01:38] corridor [1:01:40] um so we've identified over 70 [1:01:42] improvements that 40 to 45 intersections [1:01:44] for safety improvements [1:01:46] um and these kind of each have their own [1:01:48] independent utility so implementation [1:01:50] can be phased and prioritized as money [1:01:52] and uh and resources allow [1:01:55] CCTA and whitak have talked about [1:01:57] partnering to identify funding and [1:01:59] conduct Outreach we're very very very [1:02:01] very early in terms of identifying [1:02:03] specific projects but we have some [1:02:05] initial thoughts about rough funding [1:02:07] estimate for that and as I said funding [1:02:10] is not currently allocated to this [1:02:12] project [1:02:13] and we will need partnership from local [1:02:14] jurisdictions to to move this forward [1:02:19] for element two this is as I noted would [1:02:22] be contingent on further support and [1:02:24] discussions at the city level and with [1:02:26] AC transit AC transit's currently doing [1:02:28] an operational analysis and reassessment [1:02:30] of its system I think the findings of [1:02:32] that could influence the the future [1:02:35] operations of bus service in this [1:02:36] Corridor which would be good to fold [1:02:38] into this type of project so we've [1:02:40] identified that maybe it makes sense for [1:02:42] a one to two mile initial bus lane [1:02:44] segment but a lot further discussion is [1:02:46] needed before that can advance one of [1:02:48] those elements of discussion prior to [1:02:50] move forward is really that public [1:02:52] engagement part it's been a bit since [1:02:54] we've done public engagement for this [1:02:56] specific part of the corridor and so for [1:02:58] their public engagement would be [1:03:00] beneficial to identify the the exact [1:03:03] nature of the project to advance [1:03:06] and uh that actually concludes the [1:03:09] presentation happy to answer any [1:03:11] questions thank you [1:03:13] thank you [1:03:14] do we have any Commissioners hey I see [1:03:17] fideli and Kelly [1:03:21] yes thank you I just want to concur with [1:03:25] the presentation uh tonight because it [1:03:28] it truly is a classic example of urban [1:03:31] transformation in every respect every [1:03:34] city is different every mile is [1:03:36] different the widths are different there [1:03:38] are two BART stations we have parallel [1:03:40] bike Lanes so the needs are complex in [1:03:44] every way we can imagine go bold is one [1:03:46] thing do many safety projects was [1:03:49] another but one thing everyone could [1:03:52] agree with that Wick tack was on safety [1:03:54] so we appreciate the safety priority [1:03:57] here first and I want to thank CCTA [1:03:59] because on Friday WIC attack will be [1:04:01] approving its work plan which includes [1:04:04] continued discussions with CCT on how we [1:04:06] can work together to make safety In Our [1:04:09] Lifetime better on San Pablo Avenue [1:04:11] because for El Cerrito it's our downtown [1:04:14] and that's not a dance so taking away [1:04:16] parking is detrimental to our businesses [1:04:19] every city has a different concept so [1:04:21] thank you for continuing this and thanks [1:04:23] for the effort of CCTA appreciate that [1:04:25] okay well remember Kelly [1:04:28] um yes Mr dankford nice to see you in [1:04:31] person [1:04:32] um I've seen Ed WIC Tech I've seen your [1:04:33] presentation several times and I want to [1:04:35] congratulate you for all this work I [1:04:37] mean this quarter is kind of a monster [1:04:39] you know in terms of everybody wants [1:04:42] everything on San Pablo Avenue it's a [1:04:44] major arterial AC Transit runs their [1:04:47] rapid bus up and down it's used quite a [1:04:49] lot safety is a big concern and so I [1:04:52] concur with commissioner fideli that [1:04:54] safety is of the most important thing to [1:04:57] do right now absolutely [1:04:59] um as as I have said at the WIC tech [1:05:01] board as far as element number two and [1:05:04] what might come after that I think we [1:05:06] have to really listen to what AC Transit [1:05:09] wants and is willing to do and I think [1:05:11] we also have to pay attention to Alameda [1:05:13] County Transit and see if they want to [1:05:16] run some kind of brt side or Center [1:05:19] um you know whatever they decide because [1:05:21] we can't do something that's completely [1:05:23] different from what they do it would [1:05:25] just be too difficult and I must say I [1:05:28] do have some concerns and I've expressed [1:05:30] this before about [1:05:32] um bike Lanes on San Pablo Avenue if we [1:05:35] have a whole lot of these other elements [1:05:37] put in I'm really concerned about safety [1:05:39] so um [1:05:42] we'll see what happens but thank you for [1:05:43] your work on this and trying to to make [1:05:46] it clear to all of us [1:05:49] remember South thank you Mr chair uh [1:05:52] Adam thanks for the presentation this uh [1:05:54] this is my first whack at this project [1:05:56] so I am impressed by the scope and [1:05:59] complexity of this and the number of [1:06:01] agencies that are involved so [1:06:03] congratulations on hurting the cats [1:06:06] um I I have um a couple questions one is [1:06:09] I want to Echo that the safety issues [1:06:12] seem Paramount because the statistics [1:06:14] that were collected as part of the study [1:06:16] are a little bit horrifying and I think [1:06:19] if we mean what we say with vision zero [1:06:22] we really should go after uh the safety [1:06:24] improvements my second question goes to [1:06:28] um when were what does current [1:06:30] conditions mean when were they assessed [1:06:33] because with covid and with the changing [1:06:36] in people's commuting and travel habits [1:06:39] uh you know it begs the question well [1:06:42] are the the statistics on the cars [1:06:44] current are the statistics on the need [1:06:46] for uh on-street parking current [1:06:49] um can you just help me understand when [1:06:52] that snapshot was taken yeah so we have [1:06:55] data from a variety of periods a lot of [1:06:57] it was pre-pandemic in terms of some of [1:07:00] the bus uh information and the vehicle [1:07:04] volume information was a lot of that was [1:07:06] pre-pandemic parking information was [1:07:07] pre-pandemic the bulk this study was [1:07:10] done kind of law well patterns are still [1:07:12] evolving but while recovery from the [1:07:15] pandemic was still occurring so some of [1:07:17] the safety data is more recent in terms [1:07:19] of collision history and whatnot but a [1:07:21] lot of the kind of parking vehicle [1:07:23] information was pre-pandemic and yeah we [1:07:25] do recognize you you raise a good point [1:07:26] that patterns have changed out of the [1:07:28] quarterback and and does does this sort [1:07:31] of incremental approach that appears to [1:07:32] be being taken kind of address that that [1:07:35] will be getting data in real time [1:07:38] yeah and you know I think we're still [1:07:40] early on in this project and so um as [1:07:43] part of that next phase you know we [1:07:45] would recommend is we're prioritizing [1:07:47] certain spot improvements to do a deeper [1:07:49] and refresh dive into some of the data [1:07:51] to make sure that we're focusing on the [1:07:53] areas of greatest need but there's [1:07:55] really an opportunity to do that as part [1:07:56] of development and then if I may just [1:07:59] ask one more question and following up [1:08:00] on commissioner Kelly's Point um uh the [1:08:04] the issue of bike Lanes I mean what I I [1:08:06] didn't see and I might have missed it uh [1:08:09] what the data is on the use of whatever [1:08:12] bike Lanes there are now what the [1:08:15] anticipated use would be because I would [1:08:16] think that that would go to the question [1:08:18] of does one even consider putting it [1:08:21] right on putting them on San Pablo or [1:08:23] thinking about a a parallel path which [1:08:26] which from a stress standpoint seems [1:08:29] Seems more desirable [1:08:31] yeah so the the bike Lanes on the [1:08:33] corridor today are very discontinuous [1:08:34] and many ones that exist uh would not be [1:08:37] comfortable except for the most Fearless [1:08:39] of cyclists [1:08:41] um and so I wouldn't uh suggest reading [1:08:43] too much into existing usage of the bike [1:08:44] Lanes today [1:08:46] um city of San Pablo has a project that [1:08:48] they're hoping to advance to improve [1:08:50] their bike bike Lanes in their City El [1:08:53] Cerrito has put in some new facilities [1:08:54] but it's it's a bit hot hodgepodge and [1:08:57] different location by location [1:08:59] um we found that [1:09:01] um really set the southern half in [1:09:02] Contra Costa County has a really good [1:09:04] parallel facility in the East Bay [1:09:06] Greenway or some of the other parallel [1:09:07] streets do provide a parallel facility [1:09:10] but then once you get to the northern [1:09:12] portion in San Pablo and up by Hilltop [1:09:15] Mall there really is no parallel Street [1:09:17] at all and so I think the bike solution [1:09:20] is going to really warrant a segment by [1:09:23] segment look to figure out the best [1:09:24] solution there okay thank you [1:09:30] um [1:09:31] I'm not from West County but I'm old [1:09:35] enough to have actually seen the key [1:09:37] Training System still run on the Bay [1:09:40] Bridge I'm not old enough because it [1:09:42] stopped in 1948 on San Pablo but the [1:09:45] tracks are still being removed when I [1:09:46] was a kid [1:09:48] um and it's like we're trying to rebuild [1:09:49] that system [1:09:51] the reason why it works so well is dead [1:09:52] center fixed tracks [1:09:54] you know Richmond to Downtown Oakland [1:09:57] you could go to Berkeley take University [1:09:59] Avenue you can either go to the campus [1:10:01] or you went out on the pier caught the [1:10:04] like my uncle did didn't catch the pier [1:10:06] and go teach College in San Francisco as [1:10:08] you rode the ferry cross [1:10:10] um I I would just make one [1:10:11] recommendation and and the reason why I [1:10:13] preface it what was there [1:10:16] and and for those of you that live there [1:10:18] and work there [1:10:19] your challenge and you've said it as a [1:10:22] as a consultant you need to have one [1:10:23] system that goes point A to point B [1:10:25] right now there is a hodgepodge [1:10:28] everybody has their own idea and if you [1:10:29] don't come up with one solution [1:10:31] you're just going to make it worse it's [1:10:33] a mess you can't use that road for much [1:10:36] of anything because it's everything [1:10:38] changes as you go along and what used to [1:10:41] make it work it was so consistently [1:10:43] designed it was one idea one Theory [1:10:46] and I think we all know in [1:10:47] transportation [1:10:49] whether it be multimodal the more [1:10:51] consistent is the more successful it is [1:10:53] you've had a lot of street with there [1:10:55] was this huge median that was put in [1:10:57] which is where the tracks used to be and [1:10:59] there's a lot of trees in there you know [1:11:00] don't forget as you redo this one of the [1:11:03] things that hurts [1:11:04] that Corridor it's the visual beauty of [1:11:09] it is missing in a lot of places because [1:11:10] there's no Street trees and the street [1:11:12] trees can fit in all of these plans so [1:11:15] consistent plan from point A to point B [1:11:18] and and yeah you got to deal with bikes [1:11:21] but if it's a if it's to make safety [1:11:23] improvements [1:11:24] make safety improvements and it may or [1:11:26] may not include bikes all the way [1:11:28] then that's how I would look at it and [1:11:30] put the trees in please and put them [1:11:32] back [1:11:34] okay [1:11:37] thank you I was just going to add what [1:11:40] complicates it even more is the two big [1:11:43] projects at the BART station one is [1:11:45] complete streets that we're working [1:11:46] through and getting money from a variety [1:11:48] of sources and the huge Tod project at [1:11:51] the plaza where there's a different [1:11:52] planning so a lot of different plans a [1:11:55] lot of investment already so that adds [1:11:57] to the confusion of how do we be [1:11:58] consistent all the way down so it's [1:12:00] going to be difficult to ask but safety [1:12:03] we can do [1:12:07] nurse anyone in the board Chambers [1:12:11] from the public [1:12:13] seeing none do we have any remote [1:12:17] no public comment written or verbal [1:12:20] okay again this was the informational [1:12:23] item [1:12:25] want to thank Matt and Adam for their [1:12:27] presentation tonight [1:12:32] hey that concludes our regular agenda [1:12:36] items and we have no correspondence that [1:12:39] are in the package next is associated [1:12:42] committee reports [1:12:45] and those reports are from trans plan [1:12:49] transpac westcat and a consolation [1:12:53] notice from SWAT that are provided in [1:12:56] your packet [1:12:59] now we will have board comments if there [1:13:02] are any members of the board I have none [1:13:04] tonight is there any other member [1:13:09] KC none we will move to [1:13:12] um [1:13:14] staff [1:13:15] comments [1:13:17] thank you thank you for running a very [1:13:20] efficient meeting this evening [1:13:22] we're one hour and 37 minutes so in the [1:13:25] spirit of CCTA under promise and over [1:13:27] deliver [1:13:29] Ed [1:13:33] now I have more time for my executive [1:13:36] director report [1:13:39] um well I'm going to start off with some [1:13:41] some good news I just want to quickly [1:13:43] recognize our CFO Brian Keller he [1:13:46] celebrated last week his 10-year [1:13:47] anniversary with CCTA so as you all know [1:13:51] he's very valuable to the team [1:13:52] congratulations we're very happy to have [1:13:55] him here and hope that he'll stay for [1:13:57] many years to come [1:13:59] um and the sad news is we're losing one [1:14:03] of our team members Lindsey Willis our [1:14:05] director General Affairs this will be [1:14:06] her last board meeting with us so she is [1:14:09] moving on to Tiger construction [1:14:12] um and so we'll be looking for good low [1:14:14] bids from tiger in the future [1:14:16] and be very she'll be very moving very [1:14:20] close to family so which is really good [1:14:22] for her and Noah and everyone so we're [1:14:24] really excited for her so we're really [1:14:27] actually very very sad to see her go so [1:14:30] um and then to kind of help fill the Gap [1:14:33] until we find a new candidate which we [1:14:36] just a quick update we already flew an [1:14:38] advertisement for the position last week [1:14:41] so we've been getting a lot of great [1:14:43] interest into the position thank you to [1:14:46] Lindsay for all the great marketing [1:14:47] there [1:14:49] um and so Luna saliver is going to be [1:14:51] kind of stepping in and you may some of [1:14:53] you may know her she actually helped [1:14:55] during Lindsay's maternity leave so she [1:15:00] was stepping in during that time to kind [1:15:02] of fill in the gap of Lindsay and so [1:15:04] she'll be stepping in front by for the [1:15:05] next three to four months just to help [1:15:08] guide and oversee all our our wonderful [1:15:10] public Outreach consultants and work [1:15:12] with staff on a daily basis so we're [1:15:14] excited and grateful to have Luna back [1:15:16] as part of the team [1:15:19] um and then some other [1:15:21] um maybe kind of start with some good [1:15:22] news [1:15:24] um I know you've heard me talk about the [1:15:25] on the patio podcast so that has been [1:15:28] officially launched so we are now doing [1:15:30] a campaign so you can actually go to [1:15:32] anywhere you want to get your podcast [1:15:35] um Apple podcast anywhere and download [1:15:37] the podcast there's four episodes now [1:15:39] and lots of good information in there [1:15:42] about CCTA and it's been it's actually [1:15:44] been a really good tool for for me and [1:15:46] for us to really kind of promote CCTA to [1:15:48] the general public and I know it's been [1:15:51] getting a lot of likes and followings [1:15:52] already so really excited about that [1:15:55] um and then other good news uh I sent an [1:15:58] email on this but we did receive another [1:16:01] Grant so a couple weeks ago [1:16:04] the award announcements came out for a [1:16:06] trade quarter enhancement programs we [1:16:07] got 19.7 million dollars for the San [1:16:10] Pablo Avenue or San Pablo San Pablo Dam [1:16:13] Road and [1:16:16] and so we're excited about that because [1:16:17] they can move that project forward and [1:16:19] it's really critical [1:16:21] um and it's a really clear safety issue [1:16:23] with the low vertical clearance with the [1:16:26] trucks as well as some major safety [1:16:28] concerns around the interchange with the [1:16:30] very closed abutments at the shoulder [1:16:32] and so it's very narrow through there [1:16:34] and so we're excited to move that [1:16:36] project forward the other thing that [1:16:37] also happened is we worked closely with [1:16:40] UC Berkeley to submit on a center of [1:16:42] excellence Federal highways Grant so [1:16:45] we're really excited about the [1:16:46] opportunity there with UC Berkeley some [1:16:49] project updates we um [1:16:52] just in your packet you may have glanced [1:16:55] through them but there's some there's a [1:16:56] couple of really good presentations in [1:16:58] the consent the consent items on on [1:17:01] innovate 680 and also Highway 4 Vision I [1:17:04] know we were trying to kind of keep [1:17:05] today's shortest part you know it saves [1:17:07] time so we've moved those to consent but [1:17:09] there's some really good information in [1:17:10] there about some of those some of the [1:17:12] work plan items for the next two to [1:17:14] three years on innovate 680 very very [1:17:18] succinct and then also the work we're [1:17:20] doing on on the highway for vision and [1:17:22] Corridor study and then as part of [1:17:24] innovate 680 [1:17:27] um Stephanie and Stephanie who and I are [1:17:29] director of projects [1:17:30] um last week actually went to Australia [1:17:32] to um visit four different states [1:17:36] um in in three different department of [1:17:39] transportations [1:17:40] um and we were there to basically look [1:17:42] at their smart freeway program if they [1:17:44] have a very robust program in terms of [1:17:47] really leveraging data and Technology to [1:17:50] really optimize their existing corridors [1:17:53] and so through this technology they've [1:17:55] been able to realize anywhere from 20 to [1:17:58] 30 percent more efficiency in their [1:17:59] corridors I actually got to drive in one [1:18:03] of the corridors in Melbourne on the M1 [1:18:05] it has the same level of traffic that [1:18:07] i-680 does and the only place that we [1:18:10] actually stopped was actually a freeway [1:18:12] to freeway connector rant meter and [1:18:14] everything else was free-flowing at 45 [1:18:16] miles an hour during peak hour traffic [1:18:18] and so it was really exciting to see how [1:18:21] they're really leveraging technology and [1:18:23] and optimizing their freeway system was [1:18:25] also exciting their offer creation [1:18:27] centers they literally had one person [1:18:30] looking and managing their smart freeway [1:18:33] components of their of the of the of the [1:18:34] system and so not only is if it's [1:18:37] efficient [1:18:39] um but it's also [1:18:40] um efficient from a staff and resource [1:18:42] perspective and so I could geek out on [1:18:45] this for hours [1:18:46] um so I will stop there but it was a [1:18:48] very very helpful trip to really think [1:18:51] about how we are bringing that [1:18:52] technology we're already implementing [1:18:53] some of that technology in the innovate [1:18:55] 680 program as part of the Cooperative [1:18:57] adaptive rant metering project and so it [1:18:59] was good to see firsthand the vision the [1:19:02] implementation the best practices as [1:19:04] it's been expanded and adopted across [1:19:06] throughout the entire country and how [1:19:08] we're being we're going to bring all [1:19:09] that information back and apply it into [1:19:10] the 680 Corridor [1:19:12] um also quickly I know some of you are [1:19:14] interested in the fairy study so on the [1:19:16] ferry study we've we've kicked off [1:19:18] McDonald on that [1:19:20] um it's going to be about nine months to [1:19:22] complete the ferry study we're targeting [1:19:24] to have it done early next year [1:19:26] um Ying Smith our director of programs [1:19:27] is leading the effort on that and so we [1:19:30] actually just had a big kickoff meeting [1:19:32] with the transit operators and all the [1:19:34] stakeholders to start going into a data [1:19:37] collection mode for each of the [1:19:39] individual potential stops in locations [1:19:42] and so we can start assessing the ferry [1:19:44] service for all those locations [1:19:46] the other thing that we have is [1:19:50] um the operations update so now we're [1:19:52] kind of in the operations game so I [1:19:54] wanted to kind of maybe provide a quick [1:19:55] update on the Presto shuttle so Presto [1:19:58] continues to receive a lot of media [1:20:01] coverage [1:20:02] um this during this last month I was [1:20:04] able to provide two more interviews with [1:20:06] uh news stations and then also there's [1:20:10] been over 165 media pieces as well as 9 [1:20:14] 000 hits on social media relative to [1:20:16] presto and our Presto social media [1:20:19] um we've been in the first seven weeks [1:20:22] of service we've got about 300 Riders [1:20:24] which averages about 45 Riders per week [1:20:27] and just yesterday we just had an [1:20:29] official kind of open house for all the [1:20:32] tenants in Bishop ranch so we're [1:20:33] expecting that ridership to go up as [1:20:35] well and with operations there always [1:20:38] comes technical issues I'm not gonna lie [1:20:40] so we've been having some technical [1:20:42] issues with some of the antenna [1:20:43] communication but also with some of the [1:20:46] Staggering of the vehicles with the [1:20:47] schedule so they're you know we're [1:20:49] definitely keeping track and working [1:20:50] with beep to continue to optimize the [1:20:52] service we're also looking about adding [1:20:55] another stop because of the demand and [1:20:57] so we're looking at adding another stop [1:20:58] at the GE Building and so so as we're [1:21:01] kind of looking and evaluating the team [1:21:03] has been really focused on how we can [1:21:05] make that improve the quality of service [1:21:07] there and then also something I wanted [1:21:10] to mention in terms of operations we've [1:21:13] been piloting piloting this Transit [1:21:16] signal priority project so hisham's been [1:21:18] leading it and so we've been we just [1:21:21] actually finished a test of that in uh [1:21:24] two corridors in Concord and Walnut [1:21:27] Creek and so we were able to [1:21:28] successfully [1:21:30] um prioritize the bus through an entire [1:21:33] Corridor and all the traffic signals and [1:21:35] that was using a cloud-based system that [1:21:39] was communicating to the buses and their [1:21:40] CAD AVL systems and then directly to the [1:21:44] software platforms that were controlling [1:21:46] the traffic signals and so by using a [1:21:49] software approach it's a cost-effective [1:21:51] approach we don't have to add Hardware [1:21:53] to the buses or Hardware to the traffic [1:21:55] signal controllers at every intersection [1:21:57] and so we're doing that as a pilot right [1:21:59] now and I think [1:22:01] um I believe how many intersections has [1:22:03] shown total for that project [1:22:05] 66 intersections total that we're [1:22:07] looking at for part of that project and [1:22:09] that's going to be part of our broader [1:22:11] smart signal program in terms of you [1:22:13] know learning how to prioritize transit [1:22:16] buses through these traffic signals [1:22:18] um and then lastly a couple [1:22:20] administrative items [1:22:22] um I'm thinking about having a board [1:22:24] Workshop in late September early October [1:22:28] um that'll be just board only [1:22:30] um I know the last board workshop last [1:22:32] September we invited the city managers [1:22:34] the trans operators this will actually [1:22:36] be kind of a board-only invite Workshop [1:22:39] to kind of address some of the things [1:22:40] that are coming up [1:22:42] um and so I'll tarrianne and Emily will [1:22:44] be reaching out to you in terms of [1:22:46] starting to kind of securing some [1:22:47] availability and dates in late September [1:22:49] early October and then also Emily was [1:22:53] the guinea pig she went to Walnut Creek [1:22:55] and tested out this new headshot [1:22:57] headshot vendor and so I know there was [1:22:59] an email that went out so if you've got [1:23:01] a blank face on our website I encourage [1:23:04] you to go get your head shot and that [1:23:06] way we can get your smiling faces all on [1:23:09] our websites so [1:23:11] um so that's it includes my report and [1:23:13] thank you for the opportunity [1:23:15] okay thank you Tim [1:23:19] at this time I just want to have you out [1:23:23] join me and congratulating Lindsay and [1:23:27] thanking her for service outstanding [1:23:29] service here at CCTA [1:23:31] [Applause] [1:23:37] and in that same vein we want to welcome [1:23:40] Luna back [1:23:42] yeah yeah [1:23:47] and I do want to go back because I did [1:23:50] not offer opportunity for [1:23:52] representatives to make any comments no [1:23:56] okay [1:23:58] thank you so [1:24:02] now I guess where we're at is closed [1:24:05] session [1:24:10] so we will be going into closed session [1:24:13] a journeying into closed session and [1:24:17] it's going to be right across the hall [1:24:19] at the conference room [1:24:23] so we will be a journey to that and [1:24:26] reconvening back with any report out [1:24:29] that we have if we have at the closed [1:24:33] session [1:24:34] okay all right [1:24:38] well done [1:24:46] thank you [1:24:48] huh [1:25:06] what was the dinner tonight oh it was [1:25:09] like rice and beans [1:25:15] okay [1:25:21] so I just FYI tomorrow morning [1:25:29] [Music] [1:25:53] um [1:26:22] foreign [1:26:33] [Applause] [1:26:34] [Laughter] [1:26:35] [Applause] [1:26:46] [Laughter] [1:26:56] [Music] [1:27:26] [Applause] [1:27:28] thank you [1:27:30] foreign [1:28:59] thank you [1:38:48] foreign [1:42:20] now yeah [1:42:46] because [1:43:57] [Music] [1:44:58] again [1:45:12] [Music] [1:45:23] thank you [1:46:02] all right see you later [2:06:36] foreign [2:14:46] right here [2:14:49] okay I'm gonna have Amber report okay [2:14:53] okay no problem [2:15:06] that's a good time to roll [2:15:09] okay [2:15:14] the board as reconvening we have been [2:15:17] meeting in closed session Council yes [2:15:20] the board took no reportable action on [2:15:22] either closed session item okay thank [2:15:25] you all for your time this evening we [2:15:27] are adjourned thank you [2:15:30] [Applause] [2:15:36] [Music]