1 00:00:00,000 --> 00:00:07,220 Both the alderman were very concerned about the first thing you see. We really wanted to be as close to the 2 00:00:07,220 --> 00:00:13,360 clean as possible. There's some orange cones there in the middle of the median where the sign would be located, saying welcome to lock 3 00:00:13,360 --> 00:00:17,000 court, and then there would be plantings behind it down the median. 4 00:00:19,440 --> 00:00:22,800 This is probably a little too high level to see it, but you can see on here that 5 00:00:22,800 --> 00:00:28,060 355 is there, that's that first intersection and where the plannings would be. 6 00:00:28,600 --> 00:00:34,220 This is a bit of a more detail where you can see the sign at about in the middle of 7 00:00:34,220 --> 00:00:34,400 that. 8 00:00:34,520 --> 00:00:38,060 You can see the arrows pointing to the existing traffic signals out there. 9 00:00:38,200 --> 00:00:43,180 It has to be so many feet behind that and then we would have trees and plantings underneath 10 00:00:43,180 --> 00:00:47,280 that being very appeasing and pleasing view when you come into the town. 11 00:00:48,600 --> 00:00:52,780 This was an extended drawing of just a few more details of what's out there. 12 00:00:54,660 --> 00:00:57,240 And of course, the question is how much would this all cost? 13 00:00:57,980 --> 00:01:04,340 So we've put $50,000 in the budget last year because we weren't before we embarked on all this. 14 00:01:04,460 --> 00:01:06,380 We weren't sure what everything was going to cost. 15 00:01:06,600 --> 00:01:08,840 We have gotten multiple estimates on the fake sign. 16 00:01:08,840 --> 00:01:10,320 It's about $26,000. 17 00:01:10,880 --> 00:01:14,760 We're waiting for some final estimates on running power to the median. 18 00:01:14,760 --> 00:01:17,420 we're guessing 10,000 probably be a little less. 19 00:01:18,280 --> 00:01:22,000 We explored having water and irrigation to support those plants, 20 00:01:22,180 --> 00:01:24,080 but we also felt like that was an awful lot of money 21 00:01:24,080 --> 00:01:26,200 that we're not suggesting that at this time, 22 00:01:26,200 --> 00:01:30,160 that we can use our own crews to keep things water 23 00:01:30,160 --> 00:01:32,280 if we end up with a hot summer. 24 00:01:33,360 --> 00:01:35,660 A few dollars for some actual lights, hard-weired lights. 25 00:01:35,760 --> 00:01:38,060 We don't feel solar is powerful enough 26 00:01:38,060 --> 00:01:39,960 to illuminate what we're trying to do. 27 00:01:40,740 --> 00:01:42,000 And then the plantings were bit out 28 00:01:42,000 --> 00:01:43,660 and we have about 38,000 in planting. 29 00:01:43,660 --> 00:01:58,840 So, right now we're looking at over $100,000 in possibilities for this fiscal because we budgeted $50,000 and we spent a little bit in engineering, we're recommending the $38,000 in options, which is putting the sign in and then powering it up. 30 00:01:59,360 --> 00:02:08,480 If the council wanted to, we could add the plantings to that, which would be a total of $77,000, that would be about $27,000 over budget. 31 00:02:08,480 --> 00:02:12,420 And that could be done this year if we got the approval for IDOT. 32 00:02:12,760 --> 00:02:14,220 But I think it's a decision for the council. 33 00:02:14,340 --> 00:02:16,160 Do you want to wait a year and budget for it? 34 00:02:16,540 --> 00:02:20,700 Or we have projects that aren't getting completed and there is money in the check with finance. 35 00:02:20,720 --> 00:02:27,080 There is money available in the budget if you wanted to spend another $27,000 to try to wrap this all up into one year. 36 00:02:27,560 --> 00:02:30,600 But of course, it's still contingent on IDOT approval. 37 00:02:30,740 --> 00:02:36,260 But we want to get this in front of you and just kind of discuss it a little bit in regards to some of the options that are available. 38 00:02:36,260 --> 00:02:39,780 and the direction from the council and how you'd want to continue to proceed. 39 00:02:40,420 --> 00:02:42,480 All right council thoughts, questions, concerns? 40 00:02:43,760 --> 00:02:50,420 I have a couple comments. I did call an insurance agent today to find out what the minimum amount of insurance is. 41 00:02:50,540 --> 00:02:57,140 If somebody has a minimum, the bare minimum auto, the coverage for crashing into something, bare minimum is 20,000. 42 00:02:58,000 --> 00:03:01,700 If someone was to crash into it, what would the sign cost to replace since it's fake? 43 00:03:05,200 --> 00:03:08,340 It would be $26,000 in my guess to replace it. 44 00:03:08,860 --> 00:03:14,960 It would end up either our insurance or their insurance with settle in regards to if the owner didn't have enough insurance. 45 00:03:15,200 --> 00:03:17,020 Would you have the coverage to cover it if they had insurance? 46 00:03:17,020 --> 00:03:18,740 Sure, I don't know if that was how that would work, okay. 47 00:03:19,580 --> 00:03:23,840 And then with plantings, generally plantings have like a one year warranty on it. 48 00:03:24,380 --> 00:03:30,560 And so with your timing of it, when you plant something in, you keep that into consideration too. 49 00:03:30,560 --> 00:03:44,020 So just so you know, you know, all are spring I think is best in the one year warranty, so we want to also probably make sure that whatever we plant there is sustainable for salt and the snow. 50 00:03:44,500 --> 00:03:54,000 Because we have a huge problem with that in Thunder Hill and so whatever we plant in our island is not really generally last with the snow cloud coming through there. 51 00:03:54,000 --> 00:03:58,520 So just keep in mind they do look nice in other towns when the plantings are done right 52 00:03:59,540 --> 00:04:04,000 So just keep that in mind the plantings will probably be a continual cost going forward 53 00:04:04,000 --> 00:04:07,280 So it will not be some true. It'll be seasonal plantings 54 00:04:07,280 --> 00:04:14,320 By the actual sign, but it'll probably need to be something as a line item then budget going forward if we're gonna maintain it 55 00:04:14,320 --> 00:04:18,220 So right and that's the thought that you know, we do have some 56 00:04:18,220 --> 00:04:21,960 Some of the things in the budget are already where we take care of some things by H Street 57 00:04:21,960 --> 00:04:26,300 and the public landing and there's some other areas in the town where we've partnered 58 00:04:26,300 --> 00:04:29,480 with the Part District as well where they're taking care of things for us now a little bit. 59 00:04:30,920 --> 00:04:34,240 We've just started hanging the new planters that come in every year. 60 00:04:34,660 --> 00:04:40,300 We did less this year because of the State Street construction and so there's not a lot in 61 00:04:40,300 --> 00:04:43,780 the downtown that there typically is but we'll bring those back when things go up. 62 00:04:43,920 --> 00:04:48,000 So we usually do have some money in the budget for those kinds of items but we can certainly 63 00:04:48,000 --> 00:04:50,120 We look at this as make sure we had that enough to cover it. 64 00:04:50,120 --> 00:04:53,820 And then at the front, why are we not covering prior to the light pull? 65 00:04:54,320 --> 00:04:56,300 We would not be able to just put bricks there or stone. 66 00:04:56,300 --> 00:04:57,220 I doubt it wouldn't allow it. 67 00:04:57,800 --> 00:05:03,100 They had certain restrictions about how many feet they could be back from any existing features 68 00:05:03,100 --> 00:05:05,440 as they call them, which is the traffic signals. 69 00:05:06,660 --> 00:05:07,160 It would stay grass. 70 00:05:07,420 --> 00:05:07,520 Yeah. 71 00:05:08,080 --> 00:05:11,140 I mean, I guess we could potentially road until it and put bark down, but I think grass is 72 00:05:11,140 --> 00:05:11,620 probably better. 73 00:05:12,180 --> 00:05:12,320 Okay. 74 00:05:13,300 --> 00:05:13,580 That's all. 75 00:05:14,020 --> 00:05:14,780 I have a quick question. 76 00:05:14,780 --> 00:05:18,200 So as far as going back to the plant would initially a lot of them be perennial. 77 00:05:18,640 --> 00:05:24,320 So you'd be changing out some of the colors for seasons but for the most part you'll be greenering around here. 78 00:05:24,360 --> 00:05:28,580 For the most, for 90% of it it would just be greenery and we had test going to associate 79 00:05:28,580 --> 00:05:31,280 its landscape person, help with the chance that we're going to be hardy. 80 00:05:32,160 --> 00:05:36,260 What we talked about was though some seasonal changes in colors right by the sign of sale. 81 00:05:36,360 --> 00:05:41,460 So just really literally very minor plantings, which is kind of what we do at some of the other 82 00:05:41,460 --> 00:05:45,880 My name is sites in the town if the one south on state street if you've ever noticed that one 83 00:05:47,760 --> 00:05:56,040 Sorry for being so naive on this, but do that 38,000 seems like a lot of money for trees and plants and flowers 84 00:05:56,040 --> 00:06:01,400 Have we got another bids? I'm sorry if I don't know. Yeah, we have three bids 85 00:06:01,400 --> 00:06:09,080 The highest was about 52,000 the lowest was 38,000 the middle bid was about 43,000. It's a lot of excavation I dot permits 86 00:06:09,080 --> 00:06:15,740 plants, plantings, guarantees, with plantings, usually they charge you for a tree three times 87 00:06:15,740 --> 00:06:22,260 to get at the cost of plant and the cost for profit, so definitely expensive, so it was 88 00:06:22,260 --> 00:06:27,180 more than I was expecting for sure, but we also have to use prevailing wage, and there's 89 00:06:27,180 --> 00:06:29,760 a lot of things that factor into it. 90 00:06:29,840 --> 00:06:31,120 How much for rocks? 91 00:06:36,080 --> 00:06:55,280 This was kind of a subcommittee, you know, in the last year with Jim and Joanne and Pam and I and there was a lot of focus on, you know, cleaning up the town and the image and I think they wanted, there's actually several of these and I should share the plan with the rest of the council and the new members so you can see kind of what was discussed there. 92 00:06:55,280 --> 00:07:02,420 There are many entry ways that we're trying to identify to help welcome people in and certainly in some areas that are more 93 00:07:03,520 --> 00:07:09,360 Delapidated we want to signify that that's not us that this is where lock port starts and this is where things are more beautiful 94 00:07:10,720 --> 00:07:14,620 So there'll be more of these so I think we do need to be careful on the 95 00:07:15,260 --> 00:07:20,600 Presses that we set because we're going to try to emulate this in two or three other locations of the city and 96 00:07:21,300 --> 00:07:23,200 That's what we can do if you want to. 97 00:07:23,520 --> 00:07:28,120 The other thing that this probably is going to be a little bit more expensive because it's 98 00:07:28,120 --> 00:07:33,060 right there in the main corridor of 355 and 159th Street. 99 00:07:33,700 --> 00:07:39,200 There's a certain size median that's there and people don't realize that that's not our 100 00:07:39,200 --> 00:07:44,340 property, but we're asking permission to go in and plan things so that way people start 101 00:07:44,340 --> 00:07:45,200 getting the idea. 102 00:07:45,400 --> 00:07:49,800 As soon as you hit this section right here, you're entering Lockport and that was the whole 103 00:07:49,800 --> 00:07:54,360 thing to dress it up and say look we're here and you know we're ready to go. 104 00:07:54,940 --> 00:07:59,520 You could definitely revisit the plantings and try to scale back a few trees and things 105 00:07:59,520 --> 00:08:03,860 and save a few extra dollars and sometimes these things are a little over design but I'm 106 00:08:03,860 --> 00:08:08,600 not a landscape architect but well especially if we're going to have problems with salt 107 00:08:09,020 --> 00:08:12,840 and everything else I mean it's going to be expensive and maintaining it. 108 00:08:13,920 --> 00:08:19,640 All right so my question is are guys going to go out there other ones are going to water 109 00:08:19,640 --> 00:08:21,560 like they do the baskets, Ben? 110 00:08:21,840 --> 00:08:22,080 Correct. 111 00:08:22,300 --> 00:08:26,340 We would add that to the program, which we've been doing in partnership with the 112 00:08:26,340 --> 00:08:28,960 Part District this year, like to give them things because they've been doing a good 113 00:08:28,960 --> 00:08:29,200 job. 114 00:08:29,480 --> 00:08:30,720 We have to do it every day. 115 00:08:30,860 --> 00:08:34,340 You have to water and fertilize almost every day and for city crews to do it on the weekends 116 00:08:34,340 --> 00:08:35,700 and holidays, it gets a little expensive. 117 00:08:36,000 --> 00:08:38,820 So the Part District has partnered with us where we kind of do mostly during the week and 118 00:08:38,820 --> 00:08:40,200 they do a lot of the weekends and holidays. 119 00:08:41,080 --> 00:08:45,060 And there's no more harsh environment than a basket hanging in the sun and the wind. 120 00:08:45,060 --> 00:08:50,880 And so we have to give him a lot of attention and this median would be a key monument and 121 00:08:50,880 --> 00:08:54,820 image that we would, yes, we have to make sure that we have maintenance and upkeep. 122 00:08:55,400 --> 00:08:59,060 I think probably maybe some of the confusion with the plantings maybe is that this picture 123 00:08:59,060 --> 00:09:04,820 looks like there's just one bowl of plants there, so I think we don't have an expensive bowl 124 00:09:04,820 --> 00:09:05,200 of plants. 125 00:09:05,440 --> 00:09:05,900 Yeah, I see. 126 00:09:06,860 --> 00:09:10,020 But the whole median is covered with trees and landscaping. 127 00:09:10,040 --> 00:09:10,540 The entire thing is. 128 00:09:11,200 --> 00:09:11,520 Okay. 129 00:09:11,520 --> 00:09:16,560 Yeah, it's it's quite extensive. It looks like there's actually seven seven trees and yeah 130 00:09:17,460 --> 00:09:22,460 Yeah quite a bit of plantings and digging things up. Okay. All right, so I guess the question never for everyone 131 00:09:22,460 --> 00:09:27,560 I think we're all in agreement. I'm moving forward with the monument. Do you guys want to do plantings or not? I guess that's the question. So 132 00:09:29,200 --> 00:09:30,140 It's kind of get us 133 00:09:31,160 --> 00:09:32,160 Idea from you guys 134 00:09:33,160 --> 00:09:39,060 So what you're asking I mean because we could just start with this first part and then decide if we want to 135 00:09:39,480 --> 00:09:40,360 Next year, correct? 136 00:09:41,000 --> 00:09:41,500 You bet. 137 00:09:41,660 --> 00:09:44,260 We are still waiting for confirmation from my not. 138 00:09:44,280 --> 00:09:47,900 They sent us a letter when we originally applied saying can't do it this way. 139 00:09:48,020 --> 00:09:51,500 But if you follow X and Y, you will likely be approved. 140 00:09:51,660 --> 00:09:53,660 So we did what they told us to do and resummit it. 141 00:09:53,680 --> 00:09:55,520 We're hoping for an answer any day now. 142 00:09:55,600 --> 00:09:56,520 We wanted to get ahead of it. 143 00:09:56,520 --> 00:09:59,220 So if we get the okay, we can get things in right away. 144 00:09:59,220 --> 00:10:00,780 We're hoping to install it this year. 145 00:10:01,320 --> 00:10:03,580 We budgeted $50,000 in the budget this year. 146 00:10:03,640 --> 00:10:05,200 We've spent about five or six. 147 00:10:05,200 --> 00:10:09,760 So we still have $44,000 available for this. 148 00:10:09,940 --> 00:10:14,700 So if you buy the sign, it will definitely eat up most of this year's budget. 149 00:10:14,940 --> 00:10:19,780 And we figured at budget time last year that we would put funds available in each year going forward. 150 00:10:20,220 --> 00:10:22,820 We were hopeful to get maybe at least one monument per year. 151 00:10:23,060 --> 00:10:27,520 This monument is overly large and elongated because of the median size. 152 00:10:27,700 --> 00:10:33,820 So I think future and we can get estimates ahead of time this year's budget because we kind of started late on this one last year. 153 00:10:33,820 --> 00:10:36,280 where we'll be able to hopefully put in the budget 154 00:10:36,280 --> 00:10:37,740 in an appropriate amount for the next one. 155 00:10:37,740 --> 00:10:39,800 It may be 60 or may only be 40. 156 00:10:40,440 --> 00:10:43,960 But right now I think to do it to make it pop 157 00:10:43,960 --> 00:10:47,000 with a sign and plantings would be 77,000 158 00:10:47,580 --> 00:10:49,300 and we only have about 44 left. 159 00:10:49,840 --> 00:10:52,420 So we would have to take, not that we'd necessarily take away 160 00:10:52,420 --> 00:10:54,340 from another project this year 161 00:10:54,340 --> 00:10:56,060 because we have projects that don't get completed, 162 00:10:56,080 --> 00:10:57,560 we have money in the budget to do it. 163 00:10:57,840 --> 00:10:59,740 But it's a council decision on the investment 164 00:10:59,740 --> 00:11:00,620 in regards to doing that. 165 00:11:00,880 --> 00:11:03,580 So there's three options then for us to consider. 166 00:11:03,580 --> 00:11:04,420 if I'm not mistaken. 167 00:11:04,720 --> 00:11:08,400 So, we can do 38,000, get the monument up and look at plantings next year. 168 00:11:08,940 --> 00:11:13,980 We have 50,000 budgeted, so conceivably we could do a $38,000 monument and then another 169 00:11:13,980 --> 00:11:18,720 12,000 for some plantings so we stay with them budgeted and then do more than next year. 170 00:11:18,940 --> 00:11:21,080 Or we do all the plantings in the monument at once. 171 00:11:21,580 --> 00:11:25,500 So it seems to me those are the three options, it really gives us down to what you guys want 172 00:11:25,500 --> 00:11:27,940 to do and we'll put it on the agenda for next time. 173 00:11:28,440 --> 00:11:32,740 I would bring it back maybe once we get approval, I mean no sense to approve it unless we get 174 00:11:32,740 --> 00:11:39,920 I'd that's gonna okay it but all right I could do everything but all right then what why don't we just leave that out there for us to consider and you tell us what I 175 00:11:39,920 --> 00:11:44,000 That says we can do it might be a move point. So and also just so that council 176 00:11:44,000 --> 00:11:52,520 No, we are actually asking I dot to approve absolutely everything in this one time. Yeah, because they are so slow in responding 177 00:11:52,520 --> 00:11:58,940 We didn't want to wait another year just to get a yes or no. So we went in with a fool 178 00:11:59,980 --> 00:12:05,760 you know plantings and electric and water if we choose to do that it doesn't 179 00:12:05,760 --> 00:12:10,220 mean we're going to do all of it and if we do all in good time and when the 180 00:12:10,220 --> 00:12:15,140 money's available but I think just dressing up that section you know with 181 00:12:15,140 --> 00:12:20,080 something it's going to just improve the appearance. It will you guys did a good 182 00:12:20,080 --> 00:12:23,840 job thank you. Alright so we'll leave those three options floating we'll wait for 183 00:12:23,840 --> 00:12:26,780 I'd have to tell us what what they're going to actually allow and then we'll 184 00:12:26,780 --> 00:12:30,240 I don't know just how much to move forward with. 185 00:12:31,680 --> 00:12:33,340 All right, thanks again, Joanne, to say. 186 00:12:34,660 --> 00:12:35,140 Okay. 187 00:12:35,300 --> 00:12:35,540 Thank you. 188 00:12:36,060 --> 00:12:40,260 Mayor and members of the council, the next item, CA2, is a training session that we discussed 189 00:12:40,260 --> 00:12:45,300 at the last council meeting in regards to bringing members of the Heritage and Architecture 190 00:12:45,300 --> 00:12:49,800 Committee, Planning and Zoning Commission and the City Council together for a special meeting. 191 00:12:50,280 --> 00:12:53,260 We have set that for Wednesday, June 28th at 7 o'clock. 192 00:12:53,980 --> 00:12:55,920 We'll have it here in Council Chambers. 193 00:12:56,520 --> 00:12:58,680 The individual boards have all been notified 194 00:12:58,680 --> 00:13:01,440 and we'll post this online at the City Hall. 195 00:13:01,900 --> 00:13:03,280 I just wanted to bring it to your attention 196 00:13:03,280 --> 00:13:05,580 that we formally have set the state that we talked about. 197 00:13:06,040 --> 00:13:06,440 All right, good. 198 00:13:06,640 --> 00:13:08,220 I think that'll be great, so. 199 00:13:08,900 --> 00:13:12,840 And our focus is basically proper procedures 200 00:13:12,840 --> 00:13:17,320 in things for zoning processes 201 00:13:17,680 --> 00:13:21,780 and how we process things in our different meetings. 202 00:13:21,780 --> 00:13:25,820 Okay. All right. Dr. Me about July 5th. 203 00:13:25,820 --> 00:13:33,460 Yeah, CA3. Mayor and members of the council is the opportunity if you choose to skip the July 5th meeting this year. 204 00:13:33,560 --> 00:13:39,140 There's been a lot of vacations announced. And we may or may not be able to grant quorum. 205 00:13:39,140 --> 00:13:44,040 And so at this point, we don't see anything dire coming on the agenda for that date. 206 00:13:44,040 --> 00:13:48,720 So we could with your consent not have that meeting on July 5th. 207 00:13:48,720 --> 00:13:56,340 that we would have the meeting on June, the two meetings in June, and then we'd have one meeting in July on July 19th. 208 00:13:56,780 --> 00:14:06,600 Now, the question I have here is, is every meeting we always approve bills to be paid during a period and payroll. 209 00:14:07,500 --> 00:14:17,860 So if we, is it possible to go ahead and approve whatever bills that we will be approving on July 5th? 210 00:14:19,300 --> 00:14:23,900 So at this special council meeting on June 28th. 211 00:14:23,900 --> 00:14:26,480 You know, I was just writing a note to ask him about that as a potential. 212 00:14:26,620 --> 00:14:27,260 We could do that. 213 00:14:27,820 --> 00:14:31,900 But a number of the bills that you have on your list get done as manuals anyway. 214 00:14:31,960 --> 00:14:33,500 And you guys improve those after the fact. 215 00:14:33,800 --> 00:14:35,720 So this would have to be the same thing. 216 00:14:35,820 --> 00:14:38,520 Anything that had to be paid, we would go ahead and pay. 217 00:14:38,620 --> 00:14:40,900 So we didn't have any late fees or penalties on anything. 218 00:14:40,920 --> 00:14:41,900 So it wouldn't be late. 219 00:14:42,200 --> 00:14:43,380 We would go ahead and get those out. 220 00:14:43,380 --> 00:14:46,320 And anything that could wait, we will wait until the second meeting in July. 221 00:14:46,500 --> 00:14:47,180 That includes payroll. 222 00:14:47,180 --> 00:14:49,400 No, payroll always gets done automatically. 223 00:14:49,780 --> 00:14:51,640 You guys always approve that after the fact. 224 00:14:53,600 --> 00:14:57,560 So in other words, you feel like it's okay if we don't have to deal with it on that meeting? 225 00:14:58,140 --> 00:14:58,340 Yes. 226 00:14:58,860 --> 00:14:59,900 And if we had anything on- 227 00:15:00,000 --> 00:15:29,540 Emergency, we could always add it to that June 28th meeting. Okay. Feel okay with that, Darren? All right. Is it we good with that then? We all don't have to come to work on the fifth. Okay. All right, good travel holidays. All right. Talk to me about FD one. Who's that? Lisa? Yes, that's me. Thank you, Mayor. The state of Illinois requires annual passage of the prevailing wage ordinance. So we did this last year. If everybody, well, those that were here, 228 00:15:29,540 --> 00:15:36,340 remember so we have it in front of you again this year it's ordinance 17-015 the state of Illinois has not 229 00:15:36,340 --> 00:15:41,920 updated the wages since July of 2015 so you'll see that those numbers are still included in here but 230 00:15:41,920 --> 00:15:46,940 they still do require that we annually pass this ordinance so I'm seeking approval at the next 231 00:15:46,940 --> 00:15:56,140 council meeting for that ordinance okay questions concerns does that mean it'll spike if they updated 232 00:15:57,380 --> 00:16:02,520 We would have to follow whatever it is, once the state passes it, we would have to follow whatever it passes. 233 00:16:02,740 --> 00:16:03,720 Anything or... 234 00:16:03,720 --> 00:16:04,840 Oh no, there's no backpacks. 235 00:16:04,960 --> 00:16:06,900 So but it'll just, the price will just jump then. 236 00:16:08,000 --> 00:16:14,600 I'm guessing everything goes off, so the prevailing wage would go up then when they finally come up with a budget and do their death. 237 00:16:15,400 --> 00:16:15,640 Okay. 238 00:16:17,980 --> 00:16:18,860 Anything else? 239 00:16:19,580 --> 00:16:22,260 Is this something we're okay with the consent agenda then? 240 00:16:22,840 --> 00:16:23,280 Yeah. 241 00:16:23,860 --> 00:16:24,040 Okay. 242 00:16:26,180 --> 00:16:26,760 All right. 243 00:16:27,040 --> 00:16:28,220 The budget calendar. 244 00:16:28,220 --> 00:16:34,280 So in your packets, the budget calendar for fiscal year 2018, we'll start the budget 245 00:16:34,280 --> 00:16:40,240 kickoff in July and we'll start doing some reviews with Council 1-on-1s in September 246 00:16:41,060 --> 00:16:45,360 and then we'll present it to the first time at a Council meeting on October 18th. 247 00:16:45,540 --> 00:16:50,480 We'll have a public hearing November 1st and then hoping to approve a full budget by November 248 00:16:50,480 --> 00:16:51,460 15th. 249 00:16:51,860 --> 00:16:53,820 Any questions on the calendar? 250 00:16:55,000 --> 00:16:57,320 No, it looks because that's something we need to approve then. 251 00:16:57,320 --> 00:17:01,760 No, I just wanted for information just to make sure everybody was on the same page knowing where we were at. 252 00:17:02,200 --> 00:17:03,220 Okay, very good. 253 00:17:03,240 --> 00:17:03,340 Come here. 254 00:17:06,860 --> 00:17:07,240 All right. 255 00:17:08,080 --> 00:17:09,540 It's taken AT1. 256 00:17:10,040 --> 00:17:12,400 Mr. Mayor, members of the council, I'll handle the next three items. 257 00:17:12,740 --> 00:17:18,340 The first item is a license agreement between the City of Lockport and the Illinois Department of Natural Resources. 258 00:17:19,000 --> 00:17:29,340 Over the last 10 to 15 years, Chevron has been remediating the old Texaco site and making many improvements so the property can be redeveloped. 259 00:17:29,340 --> 00:17:35,740 So part of that was to deal with storm water management issues that have needed attention. 260 00:17:36,800 --> 00:17:44,180 What Chevron has done is they've replaced an old dam with a brand new dam, have added new wear and an inverted siphon. 261 00:17:44,700 --> 00:17:48,460 There's a plant that's attached to the council memo that shows you where those are located. 262 00:17:49,080 --> 00:17:59,040 And I think for our new council members, if you haven't had a chance to have a tour of the site, it's definitely worth seeing the inner workings of what they've done over the last decade or 263 00:17:59,040 --> 00:18:05,080 So, what's before you tonight is a permission from the state to have those facilities there. 264 00:18:05,680 --> 00:18:09,540 And, excuse me, and for the city of Lockport to continue maintaining them. 265 00:18:10,020 --> 00:18:16,260 The creeks in which those facilities lie are actually owned by the Illinois Department of Natural Resources. 266 00:18:16,700 --> 00:18:18,480 So, we need to get permission from them. 267 00:18:18,660 --> 00:18:21,960 They usually grant permission through a license, was called a license agreement. 268 00:18:22,180 --> 00:18:27,120 Functions like a lease, and it gives us permission to maintain those structures there. 269 00:18:27,120 --> 00:18:33,780 here. What's before you tonight is first reading on the license agreement. There's a $200 270 00:18:34,480 --> 00:18:40,440 annual fee that the city pays to IDNR for permission to do that. This is a 20-year agreement 271 00:18:41,240 --> 00:18:47,740 and IDNR and the city have many agreements along the I&M canal which is owned by the state. 272 00:18:48,620 --> 00:18:52,960 City staff is recommending approval. If you have any questions I'd be happy to answer them. 273 00:18:52,960 --> 00:18:57,360 Otherwise, our recommendation is to put it on the next agenda for approval. 274 00:18:58,600 --> 00:18:59,480 Questions, concerns? 275 00:19:01,340 --> 00:19:01,740 All right. 276 00:19:02,260 --> 00:19:03,660 Put it on for another damn vote. 277 00:19:05,000 --> 00:19:06,900 All right, ma'am. 278 00:19:08,400 --> 00:19:09,560 Sorry, couldn't help it. 279 00:19:09,780 --> 00:19:09,940 All right. 280 00:19:10,360 --> 00:19:11,200 What else you got, Tommy? 281 00:19:11,680 --> 00:19:15,480 Next item is an amendment to the administrative adjudication ordinance. 282 00:19:15,980 --> 00:19:20,740 Last year, the City Council approved an ordinance change that allowed a lot of the tickets that 283 00:19:20,740 --> 00:19:27,640 were previously written for parking and other minor violations, they to go through an administrative 284 00:19:27,640 --> 00:19:33,600 adjudication process rather than taking certain offenses to circuit court. As we've gotten 285 00:19:33,600 --> 00:19:39,060 into the program and the police department manages this program, there have been some portions 286 00:19:39,060 --> 00:19:44,660 of our old code that have either a conflict or are redundant. What's before you is a cleanup 287 00:19:44,660 --> 00:19:50,280 ordinance that eliminates some of the conflicts and some of the redundancies. It also corrects 288 00:19:50,280 --> 00:19:52,500 the schedule of fines. 289 00:19:52,960 --> 00:19:57,260 If you look at the schedule, there's a series of fines that are paid, and there's a way 290 00:19:57,260 --> 00:20:01,900 of minimizing how much you pay by paying it within the first 10 days of receiving the 291 00:20:01,900 --> 00:20:02,220 ticket. 292 00:20:03,140 --> 00:20:10,400 The very tail end of the fines had an error where there was a $10 increase that was intended 293 00:20:10,400 --> 00:20:12,060 that did not show up in the code. 294 00:20:12,480 --> 00:20:18,940 So what we've done is we've added a provision that changes that schedule and makes certain violations 295 00:20:18,940 --> 00:20:27,260 If you haven't paid after the first 56 days of the issuance of the ticket, then it goes up substantially. 296 00:20:28,020 --> 00:20:30,040 We actually don't use this too often. 297 00:20:30,160 --> 00:20:35,820 Most people end up paying their tickets within the prescribed time, or if they want to contest it. 298 00:20:35,920 --> 00:20:41,460 There's a process for contesting it and an administrative adjudication hearing officer makes those decisions. 299 00:20:42,220 --> 00:20:46,760 The ordinance before you's been reviewed by the police department and they're recommending approval as MI. 300 00:20:46,760 --> 00:20:50,060 if you have any questions to be happy to answer them otherwise we're 301 00:20:50,060 --> 00:20:55,060 recommending that this be placed in the next agenda for approval. All right 302 00:20:55,060 --> 00:21:01,520 questions concerns? Just a little background on this this this came about year or 303 00:21:01,520 --> 00:21:06,480 so go based upon the fact that our municipal code really didn't have a whole lot of 304 00:21:06,480 --> 00:21:12,760 bite to it in regards to enforcement. For example we go ahead and we 305 00:21:14,280 --> 00:21:19,340 somebody doesn't cut the grass and there's probably half a dozen of more people 306 00:21:19,340 --> 00:21:25,780 in town that don't cut the grass, we cut the grass for them and the old way 307 00:21:25,780 --> 00:21:30,160 which was basically is as well they just accumulate this debt, accumulate this 308 00:21:30,160 --> 00:21:37,260 debt, accumulate this debt until such time Aline was put on their property and if 309 00:21:37,260 --> 00:21:41,260 and when they'd ever sell their house in the next 50 years that was the only 310 00:21:41,260 --> 00:21:48,960 recourse it to city head. So this puts a little bit of bite into it. So this is phase 311 00:21:48,960 --> 00:21:57,780 one of a two-phase implementation of what I'm hoping we'll be doing phase two probably 312 00:21:57,780 --> 00:21:58,760 September October. 313 00:22:01,080 --> 00:22:08,660 All right. Anything else? Okay. I forgot to ask you out consent for 314 00:22:08,660 --> 00:22:13,740 AT1, you guys okay with consent for the license agreement for next time and then are we okay 315 00:22:13,740 --> 00:22:15,260 with a consent agenda for this item? 316 00:22:17,100 --> 00:22:18,740 All right, what's the last one you got there, Tommy? 317 00:22:18,900 --> 00:22:19,320 Last item. 318 00:22:19,520 --> 00:22:24,100 It's an amendment to the City Empowerment and Tolling of Vehicles, Ordnance, Deputy Chief 319 00:22:24,100 --> 00:22:28,740 Huff and I have been reviewing the State Statute that gives the City the authority to tow 320 00:22:28,740 --> 00:22:32,140 vehicles that have been used in the commission of certain offenses. 321 00:22:32,740 --> 00:22:38,440 We found that the City Code was not consistent with the State Authorization Statute, so it's 322 00:22:38,440 --> 00:22:43,880 It's necessary for us to update the city code so it matches what's allowed by the state. 323 00:22:44,260 --> 00:22:50,160 What's before you is basically another cleanup ordinance that gets our towing ordinance in line with what the state authorizes. 324 00:22:50,840 --> 00:22:55,560 The city staff is recommending its approval and if you have any questions, I'd be happy to answer them. 325 00:22:56,040 --> 00:22:59,060 Otherwise, we're recommending approval of this ordinance also at the next meeting. 326 00:23:00,040 --> 00:23:00,720 All right, any questions? 327 00:23:02,000 --> 00:23:02,780 We're good with consent. 328 00:23:04,990 --> 00:23:05,450 Thank you. 329 00:23:06,850 --> 00:23:08,270 All right, we've just taken CE1. 330 00:23:16,100 --> 00:23:21,600 Whatever you're comfortable, Brent, obviously we'll choose here if I have a choice. 331 00:23:21,720 --> 00:23:21,860 Okay. 332 00:23:23,500 --> 00:23:25,920 Stay out of the hot seat for a couple more meetings, maybe. 333 00:23:27,220 --> 00:23:29,480 This evening we do have an item on the agenda. 334 00:23:29,560 --> 00:23:33,680 This is the Public Works, I'll say slash engineering department. 335 00:23:34,760 --> 00:23:39,620 Amy Wagner did prepare a memo, so I'm not going to read it word for word, but do want to 336 00:23:39,620 --> 00:23:44,760 hit a few highlights in the memo this evening, and then we can talk through it in a little 337 00:23:44,760 --> 00:23:45,380 bit more detail. 338 00:23:45,380 --> 00:23:50,340 The current project that we have going on, the reconstruction, water main replacements, 339 00:23:50,900 --> 00:23:59,720 Jefferson, Washington, Division, 13th, 14th streets, in the city, the project went to bid, 340 00:24:00,260 --> 00:24:04,600 the project is under construction currently, the project has been under construction for, 341 00:24:05,120 --> 00:24:11,280 I'm sorry, I apologize, project has been under construction, yes, for about a week and a half, 342 00:24:11,280 --> 00:24:15,160 I was going to say a couple weeks, but a week and a half the project's been under construction. 343 00:24:17,680 --> 00:24:24,640 Before we started construction of this project, what we do as a department is we go out and we do our Julie locates. 344 00:24:24,920 --> 00:24:32,160 This is a common practice. This is what we have to do as a department. We have to do this as a utility provider, just like AT&T, ComEd. 345 00:24:33,500 --> 00:24:39,660 What we had to do is we had to go out and locate our water main. When we did that, when we went out and located our water main, 346 00:24:39,660 --> 00:24:44,780 I mean, we found water man that was not shown on the plans and that was not shown on our previous 347 00:24:44,780 --> 00:24:45,340 atlas. 348 00:24:46,440 --> 00:24:51,160 In talking with staff, we have an atlas from about the 70s, about 1972. 349 00:24:52,040 --> 00:24:54,800 We also have an atlas from about 2007. 350 00:24:55,120 --> 00:24:56,100 These are the dates on them. 351 00:24:56,720 --> 00:25:00,900 I don't want to tell you that's the exact date, year that they were created, but those are 352 00:25:00,900 --> 00:25:02,480 the dates that are on these atlas. 353 00:25:03,160 --> 00:25:08,120 Neither atlas showed the water man that we were able to find in the field. 354 00:25:08,120 --> 00:25:14,720 And specifically on Jefferson Street from 14th to Division, there was a 4-inch water 355 00:25:14,720 --> 00:25:19,640 main that was out in the field that was not shown again on the plans of the Atlas. 356 00:25:20,300 --> 00:25:23,840 This is part of our limits of construction. 357 00:25:24,260 --> 00:25:29,200 As part of the limits of construction, as part of this project, we are replacing all 4-inch 358 00:25:29,200 --> 00:25:29,640 water main. 359 00:25:29,940 --> 00:25:32,940 This water main has been deemed substandard. 360 00:25:33,260 --> 00:25:35,860 We've had issues on it in the past in these areas. 361 00:25:35,860 --> 00:25:43,560 So when we found out that there was a four inch water main that we were unaware of we do we wanted to bring this to council to 362 00:25:43,560 --> 00:25:49,320 Include us in the project. We feel now is the time everything's being torn up. We're reconstructing the roadways, 363 00:25:50,160 --> 00:25:50,860 reconstructing curb, 364 00:25:52,480 --> 00:25:59,020 reconstructing water main on the adjacent blocks. So again as part of this project, we wanted to include that. 365 00:25:59,820 --> 00:26:03,800 Moving along to the next intersection Washington, 366 00:26:03,800 --> 00:26:11,200 an division, we had a similar situation in addition to, again, the Alice not being accurate 367 00:26:11,200 --> 00:26:15,660 when we went out there, we had our staff go out there, we had our water staff do field 368 00:26:15,660 --> 00:26:20,660 locates. We also, after talking about, we've had some recent water main breaks in this area. 369 00:26:21,520 --> 00:26:27,840 And so, again, once we were kind of able to on paper, here's where the limits of our project 370 00:26:27,840 --> 00:26:33,060 scope are, here's where the limits of the water main are, confirm those in the field. We 371 00:26:33,060 --> 00:26:37,760 We felt as though we wanted to, number one, clean up the intersection, which you can 372 00:26:37,760 --> 00:26:45,040 see, again, refer to specific pages in the memo, but also we wanted to clean up some 373 00:26:45,040 --> 00:26:45,420 main breaks. 374 00:26:45,600 --> 00:26:49,400 We had some main breaks along Division Street that have occurred over the last several years 375 00:26:49,400 --> 00:26:52,360 when you drive up and down Division every time you see a patch. 376 00:26:52,980 --> 00:26:53,560 That's what it is. 377 00:26:53,660 --> 00:26:54,420 That's a water main break. 378 00:26:54,640 --> 00:26:57,820 So as part of this job, again, we wanted to include that. 379 00:26:59,620 --> 00:27:05,060 excuse me, so as part of the project and I know as part of the memo, the big question 380 00:27:05,060 --> 00:27:10,400 is how do we get here, why do we get here, and those are some questions that I definitely 381 00:27:10,400 --> 00:27:15,860 wanted to understand myself. I think for us as a staff, how do we get here? 382 00:27:18,480 --> 00:27:19,560 The atlas is 383 00:27:19,560 --> 00:27:25,260 something that we have to work on as a city. It's not, I don't think it's just our department 384 00:27:25,260 --> 00:27:30,140 I don't think it should all be put back on, I'll say the public works, this is something 385 00:27:30,140 --> 00:27:32,060 that's occurred over many years. 386 00:27:33,560 --> 00:27:40,900 So to have an atlas that is 50-60-70% accurate, it's almost like we don't have an atlas 387 00:27:40,900 --> 00:27:41,840 that we can rely on. 388 00:27:42,380 --> 00:27:48,740 And so at one point, do you say it's no longer worth providing to developers, providing 389 00:27:48,740 --> 00:27:54,780 to engineers for the project, utilizing as staff to design from. 390 00:27:54,780 --> 00:28:00,440 So I think that is one thing that I'm learning and I'm understanding that this Atlas is as far 391 00:28:00,440 --> 00:28:07,320 from accurate. Again, over the years I think what it's been is just a compilation of not taking 392 00:28:08,020 --> 00:28:14,080 the proper steps to document projects as they were completed. Take that document and information 393 00:28:14,080 --> 00:28:21,020 and put it into our Atlas, put it into our mapping system. I think that's not been done. I also think 394 00:28:21,020 --> 00:28:27,980 that, you know, when this 4-inch water main, 4-inch water main 50, 60, 70 years old, when 395 00:28:27,980 --> 00:28:33,760 that was done, proper records were not taken. Again, why? I don't want to speculate 396 00:28:33,760 --> 00:28:40,200 this evening, but those are some issues that we've seen. So that, to me, biggest issue 397 00:28:40,200 --> 00:28:45,140 is that atlas. How can we figure that out? How can we address this for the long term? 398 00:28:45,360 --> 00:28:50,180 The water, the storm sewer, and the sanitary sewer? So that's kind of the big picture 399 00:28:50,180 --> 00:28:55,300 that I see. And I think the next question, honestly, and we've talked internally about 400 00:28:55,300 --> 00:29:02,320 this is before we actually started construction on this section of the project, we as a 401 00:29:02,320 --> 00:29:08,380 city, we located these issues. So our staff went out there, located the water main, determined 402 00:29:08,380 --> 00:29:13,640 that the water main that is shown on the plans, the water main existing did not match what 403 00:29:13,640 --> 00:29:14,560 is actually out in the field. 404 00:29:15,520 --> 00:29:19,020 So after understanding that, on my end, 405 00:29:19,680 --> 00:29:21,260 one of the things that we've talked about in again, 406 00:29:21,340 --> 00:29:23,640 this is kind of how I feel like we are going to address this 407 00:29:23,640 --> 00:29:24,620 in the future. 408 00:29:25,380 --> 00:29:27,600 In addition to the water atlas, the sewer atlas, 409 00:29:27,700 --> 00:29:31,160 the storm atlas, we also want to take a little bit more 410 00:29:31,160 --> 00:29:35,220 of a proactive approach, rather than waiting until that project 411 00:29:35,220 --> 00:29:38,120 goes to bid, and that project is going to start, 412 00:29:38,480 --> 00:29:39,820 and we're going to go out and do our Julie 413 00:29:39,820 --> 00:29:40,880 locate at that time. 414 00:29:41,280 --> 00:29:45,020 Again, talking with staff, we've come up with this is how we're going to do it. 415 00:29:45,280 --> 00:29:50,520 During design, so for next year's projects, next year's design projects, we're going to 416 00:29:50,520 --> 00:29:51,900 go out and do that Julie Locate now. 417 00:29:53,160 --> 00:29:56,640 So we go out, we actually physically locate it to the best of our ability. 418 00:29:56,820 --> 00:29:57,960 None of us have x-ray vision. 419 00:29:59,640 --> 00:29:59,880 You know, 420 00:30:00,000 --> 00:30:06,000 So the best, what you do is you go out there, use the best technology that you can, and we're 421 00:30:06,000 --> 00:30:10,680 going to go out and try and locate that water, to eliminate this type of a situation where 422 00:30:10,680 --> 00:30:17,560 we're missing an entire block. It's not shown on the atlas. That atlas, again, is what 423 00:30:17,560 --> 00:30:22,520 I think has been used as a tool, and I don't know if moving forward if it's the best tool to 424 00:30:22,520 --> 00:30:27,060 be used. So that is, again, that's kind of one of the ways that I've talking with staff 425 00:30:27,060 --> 00:30:30,540 that we're going to move forward, we're going to address these things. Another 426 00:30:30,540 --> 00:30:36,000 issue is a section of Washington 427 00:30:36,000 --> 00:30:39,660 and division, especially on division, if we knew that there were water main 428 00:30:39,660 --> 00:30:43,500 breaks there, why were those not initially included in the plans? Valid 429 00:30:43,500 --> 00:30:48,920 question, I understand that can be a concern, something that, again we've talked 430 00:30:48,920 --> 00:30:53,780 about as staff, we've talked about as a department, how can we address this? 431 00:30:54,880 --> 00:31:00,480 easiest thing and I know everybody's going to say probably the communication. I think 432 00:31:00,480 --> 00:31:05,540 it's getting everybody together and again I think they've done a lot of good communication 433 00:31:05,540 --> 00:31:11,680 in the past with the water department and the engineering with the sewer and the engineering. 434 00:31:12,160 --> 00:31:16,580 We're going to set everybody down and we're going to really focus on that moving forward 435 00:31:16,580 --> 00:31:25,660 here this year, focus on each plan set. Every department gets the ability to review, give 436 00:31:25,660 --> 00:31:31,840 comments, and then we're going to have a sign off essentially that somebody is accepting 437 00:31:31,840 --> 00:31:39,080 I have reviewed it. This goes to myself as well. I will review them, document it, sign it. 438 00:31:39,500 --> 00:31:42,700 Everybody's going to put in their input, and I think we're going to have a heck of a lot 439 00:31:42,700 --> 00:31:47,680 more thorough process to hopefully catch as many of these as we can will we catch 440 00:31:47,680 --> 00:31:51,540 them all absolutely not I think they're still going to be some potential out there 441 00:31:51,540 --> 00:31:56,760 moving forward again none of us have extra vision but I think these are some 442 00:31:56,760 --> 00:32:02,160 stuff so we're going to be able to take to alleviate some of these issues all right 443 00:32:02,160 --> 00:32:15,760 I have a question, when you say we do the Julie Locate, is it we, our staff, or is it 444 00:32:15,760 --> 00:32:20,920 we hire somebody to go ahead and do it? Because every time I've ever seen somebody out 445 00:32:20,920 --> 00:32:29,260 there, it's always been somebody from Comet or somebody from NICOR, which leads to the next 446 00:32:29,260 --> 00:32:36,760 question here is, is whoever we is, and to be honest with you, I like what you 447 00:32:36,760 --> 00:32:41,440 presented going forward, but whoever we is, if 448 00:32:44,580 --> 00:32:47,120 we're out there, no, I'm not an engineer, 449 00:32:47,940 --> 00:32:53,700 I'm not a Julie guy, okay, I'm just a guy who says, well, it makes sense that if we 450 00:32:56,220 --> 00:33:06,280 are out 451 00:33:06,280 --> 00:33:12,280 knowing it's in an easement that's probably provided by the city, then by 452 00:33:12,280 --> 00:33:17,320 golly within an easement, there's probably going to be something else. And so 453 00:33:17,320 --> 00:33:20,380 then you say that, well, we found it after the fact. 454 00:33:22,920 --> 00:33:23,600 So, 455 00:33:27,280 --> 00:33:28,500 and we had an 456 00:33:28,500 --> 00:33:35,740 outside engineering company overview this thing, and it never occurred to them 457 00:33:35,740 --> 00:33:43,220 that hey somehow these people are getting water we haven't found the water 458 00:33:43,220 --> 00:33:48,980 main but we're just going to go ahead and drop these nice lines on a piece of 459 00:33:48,980 --> 00:33:54,780 paper and have a go ahead and with with all these arrows and stuff and dotted 460 00:33:54,780 --> 00:33:59,860 lines and hold by the way you know we don't know how these people are getting 461 00:33:59,860 --> 00:34:04,920 water I mean it's just so I don't know how I'm disappointed I don't know if I'm 462 00:34:04,920 --> 00:34:10,800 disappointed in staff from disappointed in the people that we spent a lot of money actually 463 00:34:10,800 --> 00:34:17,200 go ahead and engineering this thing. And that's, you know, I like an explanation from them 464 00:34:17,620 --> 00:34:24,380 why they missed this because they were paid a lot of money to design this thing and they 465 00:34:24,380 --> 00:34:31,740 screwed up. I think it's very fair question to take take it back to the first question regarding 466 00:34:31,740 --> 00:34:36,540 the Julie Locates. Julie Locates are typically you're going to have a couple 467 00:34:36,540 --> 00:34:39,540 different companies out there. You're going to have USIC. You'll see their trucks 468 00:34:39,540 --> 00:34:48,720 all around. USIC handles AT&T, ComEd, NICore, Comcast. They're basically they are 469 00:34:48,720 --> 00:34:55,720 a contracted by all of these utilities and that's who goes out and does all the 470 00:34:55,720 --> 00:35:00,040 Locates. So they're locating for many different companies. We do our own. So when 471 00:35:00,040 --> 00:35:04,800 I say we are staff our water staff goes out and we actually physically locate our water 472 00:35:04,800 --> 00:35:11,820 main in the field so our water staff is who does that sanitary sewer again the same same 473 00:35:11,820 --> 00:35:17,320 thing we go out and we locate that so when that Julie comes in we've got 48 hours to go 474 00:35:17,320 --> 00:35:24,780 out and we've got you know to do that so again moving forward I really do think that it's 475 00:35:24,780 --> 00:35:30,920 something you know that if we do that ahead of time and you do a little bit of 476 00:35:30,920 --> 00:35:33,720 investigation when you're out there something doesn't quite look right again I 477 00:35:33,720 --> 00:35:37,480 don't want to pretend that this is an ultimate fix because it's gonna take us 478 00:35:37,480 --> 00:35:41,980 step forward I don't think it's gonna be an ultimate fix but it will take us 479 00:35:41,980 --> 00:35:47,120 that next step quite honestly when I looked at the plans I said probably the same 480 00:35:47,120 --> 00:35:54,020 as you regarding our designer the engineer that did the design I was I was 481 00:35:54,020 --> 00:36:01,100 disappointed when I first saw the plans. They showed some water services didn't 482 00:36:01,100 --> 00:36:09,280 connect anywhere. I needed to understand why, how, how did that happen. The 483 00:36:09,280 --> 00:36:13,860 biggest thing that I hear that I understand is that the Atlas was what was 484 00:36:13,860 --> 00:36:18,480 provided to them. And then the second thing is some of these services, this is a 485 00:36:18,480 --> 00:36:25,320 short block. It's kind of a diagonal block Jefferson from 14th Division. It's kind 486 00:36:25,320 --> 00:36:30,520 of an odd block and so the services when they are short like that sometimes when 487 00:36:30,520 --> 00:36:33,740 they're short like that again I'm learning this the more I talk and see 488 00:36:33,740 --> 00:36:39,020 things they go instead of necessarily having to be right out in front of the 489 00:36:39,020 --> 00:36:43,820 house we actually have some pretty long services. Again not what I would 490 00:36:43,820 --> 00:36:48,440 recommend not what we would do today but I guess it's not that abnormal to have 491 00:36:48,440 --> 00:36:54,960 a service make a 90 and go another 100 feet to a side street and tie in to another 492 00:36:54,960 --> 00:36:59,160 water main. Again, is it right? No, we're going to fix that. We're going to eliminate 493 00:36:59,160 --> 00:37:03,580 those as we come across them. But again, it's not that abnormal. So I think what happened 494 00:37:03,580 --> 00:37:08,560 was when they had that instance where they said, okay, we're not seeing anything. It must 495 00:37:08,560 --> 00:37:13,900 be that there's, I don't want to speak for that engineer, but here's what the situation 496 00:37:13,900 --> 00:37:19,080 is, do I think it's right? I would have liked us to have pushed a little bit more. 497 00:37:19,280 --> 00:37:24,460 Quite honestly, I think that's our job as city staff. The consultants there to do their 498 00:37:24,460 --> 00:37:26,400 job, but our job is to manage them. 499 00:37:28,620 --> 00:37:35,540 Again, it's a tricky area because none of us have extra 500 00:37:35,540 --> 00:37:40,740 vision, so the only way to do it is to maybe do some potholes. That was another thing that 501 00:37:40,740 --> 00:37:44,020 we talk about today, moving forward. 502 00:37:44,160 --> 00:37:45,940 And again, I don't want to throw all these things out there 503 00:37:47,140 --> 00:37:49,420 without really truly evaluating the cost. 504 00:37:49,900 --> 00:37:51,820 One of my thoughts, you know, and again, 505 00:37:51,900 --> 00:37:52,820 in talking to staff. 506 00:37:54,100 --> 00:37:57,260 Next year's projects, we also, we end in a cost 507 00:37:57,260 --> 00:37:59,700 for what's called pod-hoeing. 508 00:38:00,340 --> 00:38:02,460 You actually go out there in every block. 509 00:38:02,840 --> 00:38:06,220 If we think the water means five feet off the back of curb, 510 00:38:06,740 --> 00:38:09,120 we go out there in every, let's say, 300 feet 511 00:38:09,120 --> 00:38:11,000 or every 600 feet or block corners. 512 00:38:11,720 --> 00:38:13,220 And we actually do a pot well. 513 00:38:13,360 --> 00:38:14,960 You're essentially just digging it up, 514 00:38:15,100 --> 00:38:17,480 finding it, locating it, confirming it's there, 515 00:38:17,980 --> 00:38:19,280 doing nothing more than confirmation. 516 00:38:20,180 --> 00:38:22,260 Confirming here, here, move on to the next block, 517 00:38:22,440 --> 00:38:23,120 confirm here, here. 518 00:38:23,680 --> 00:38:24,840 It adds a little bit of cost. 519 00:38:25,840 --> 00:38:27,320 My thought would be we would roll that 520 00:38:27,320 --> 00:38:28,920 into the previous year's cost. 521 00:38:29,140 --> 00:38:31,460 And again, I haven't talked to anybody more than, 522 00:38:31,620 --> 00:38:33,820 I mean, these are just some ideas of brainstorming. 523 00:38:33,900 --> 00:38:37,240 But we would throw into the 2018 project. 524 00:38:37,240 --> 00:38:45,660 We would throw the cost into the 2017 project. Now, again, I understand we're beyond that, but for the 2018 year, we would do those 525 00:38:45,660 --> 00:38:56,460 potholes for the 2019 project. 2019, we would do the potholes for 2020. Again, you're talking what I would consider money well spent. 526 00:38:56,460 --> 00:39:05,300 a few thousand dollars added to these projects it's not you know it's not like 527 00:39:05,300 --> 00:39:08,160 we're talking a hundred thousand dollars we're talking a few thousand dollars to 528 00:39:08,160 --> 00:39:14,180 get eyes on these pipes again it eliminates any what ifs where where's this 529 00:39:14,180 --> 00:39:22,040 well I'm also thinking here is you know we have the some time soon 12 months or 530 00:39:22,040 --> 00:39:31,420 So we will be going ahead and beginning the 2020 to 20 whatever capital improvement plan. 531 00:39:34,660 --> 00:39:41,830 And what kind of concerns me here is this whole atlas thing and a kind of piggyback with 532 00:39:41,830 --> 00:39:51,250 this is a week or so ago bent rent and I were down on the west side down by the water treatment 533 00:39:51,250 --> 00:39:58,390 plant and he has an atlas in this area doesn't show a storm sore and 534 00:40:00,440 --> 00:40:02,300 based upon what you've 535 00:40:02,300 --> 00:40:07,500 kind of outlined tonight, I don't know if there's a storm sore there or not, we just didn't 536 00:40:07,500 --> 00:40:16,940 see it. So I don't know how we do the survey, I don't know how we find these things. I don't 537 00:40:16,940 --> 00:40:24,180 How do we find out if if it is true or not if that area down on the west side truly does not have a storm sore 538 00:40:25,420 --> 00:40:27,040 Okay, a lot of investigation 539 00:40:27,040 --> 00:40:32,460 Okay, and and that's gonna be something so so how do we how do we pay for that? 540 00:40:33,180 --> 00:40:33,480 Okay 541 00:40:35,980 --> 00:40:41,640 Going forward it because within the cap of room plan we're gonna have to go ahead and have some type of 542 00:40:42,140 --> 00:40:43,020 funding available 543 00:40:43,020 --> 00:40:47,660 available for 2021, 22, whatever it's going to be. 544 00:40:48,420 --> 00:40:52,020 But we can't just start on it in June of 2019. 545 00:40:53,460 --> 00:40:56,200 So let me just say some of this back, 546 00:40:56,200 --> 00:40:57,400 so I make sure I understand it. 547 00:40:58,380 --> 00:41:00,240 One of the big issues we had this time was, 548 00:41:01,220 --> 00:41:03,320 when we did Julie, it's after it was designed 549 00:41:03,320 --> 00:41:04,740 and we're about to do construction. 550 00:41:04,740 --> 00:41:06,760 So it's like, oh my, this is when 551 00:41:06,760 --> 00:41:08,380 we found the other water may. 552 00:41:09,220 --> 00:41:12,440 I think what your assessment is like, OK, clearly 553 00:41:12,440 --> 00:41:19,100 are not accurate and so we need to be doing those kind of locations whether it's through 554 00:41:19,100 --> 00:41:26,320 pod-holing or you know locating ahead of time the year before so that way when the projects 555 00:41:26,320 --> 00:41:31,380 are being designed we take that into account and I think that's obviously the right thing 556 00:41:31,380 --> 00:41:31,920 to do. 557 00:41:32,860 --> 00:41:39,040 You know as Darren pointed out it's I think maybe what the point of what you're seeing 558 00:41:39,040 --> 00:42:09,020 Indian and Darren is how do we do that for everything, whether it's storm sewers or and because it would be a monumental task to say hey, let's get that at last updated this year, it's probably the prudent thing to do is to look at it a year ahead of time like you're saying we know what our projects are going to be a year ahead of time we could probably take that in chunks maybe a year or two years so we're not overwhelming trying to update the entire old section. 559 00:42:09,020 --> 00:42:12,720 in a town. And I think that's the assumption. And you know, you and I had a conversation, 560 00:42:12,820 --> 00:42:17,460 but just that one project done Jefferson, where we saw the sewer, wasn't really accurately 561 00:42:17,460 --> 00:42:22,700 put. And so we were moving poles for, you know, not really a good reason. So, you know, 562 00:42:22,920 --> 00:42:28,260 we've already had the conversation and I feel confident that, you know, as you know, you're 563 00:42:28,260 --> 00:42:32,120 on board that, you know, taking a closer look at these projects in the old section of 564 00:42:32,120 --> 00:42:38,800 town, you know, the year before is really going to be I think the solution. There's no doubt 565 00:42:38,800 --> 00:42:41,000 we're all disappointed in how this played out. 566 00:42:41,160 --> 00:42:42,680 Clearly, we have to do this. 567 00:42:42,740 --> 00:42:45,660 We can't not do this piece of water main and 568 00:42:45,660 --> 00:42:48,720 leave a four inch while we have the larger water mains on either side. 569 00:42:50,240 --> 00:42:51,580 Clearly, you know the predicament. 570 00:42:51,800 --> 00:42:53,520 We have to come up with a budget. 571 00:42:53,700 --> 00:42:55,300 We have to try to fit within the budget. 572 00:42:55,480 --> 00:42:59,600 We plan ahead and so when these kind of curve balls are throwing at us, 573 00:42:59,660 --> 00:43:02,500 it makes it difficult and confidence wins. 574 00:43:03,080 --> 00:43:06,640 So I think some of your solutions are good. 575 00:43:06,640 --> 00:43:13,060 and I think it's the right way to approach it in the future and just assume that 576 00:43:13,060 --> 00:43:17,280 everything in the old section of town is not what it appears, right? So just 577 00:43:17,280 --> 00:43:20,900 get in there, it's like, you know, those of us old old houses in this part of 578 00:43:20,900 --> 00:43:24,780 town, we know what happens when we open a wall, right? A lot of scary things are in 579 00:43:24,780 --> 00:43:28,980 there. So we have the ability, like you said, through pod-holing or locating to 580 00:43:28,980 --> 00:43:33,380 try to get a really good handle on what's what's we're gonna run into in the 581 00:43:33,380 --> 00:43:36,040 in the future and doing that ahead of time, I think, is the right answer. 582 00:43:38,040 --> 00:43:40,460 All right, what else have you got any other thoughts, concerns here? 583 00:43:41,180 --> 00:43:45,160 If I could chime in a little bit here, the project's on hold right now. 584 00:43:46,380 --> 00:43:52,740 Where obviously, I don't see anybody here from JJ Benes, who's our representative on this project for JJ Benes? 585 00:43:52,920 --> 00:43:53,400 Amy, do we know? 586 00:43:54,900 --> 00:43:55,080 Ryan? 587 00:43:59,540 --> 00:44:05,100 Little disappointed that he's not here, but we can certainly follow up with them and sit down and discuss this a little bit. 588 00:44:05,100 --> 00:44:14,720 But being that it's on hold, and we're here at committee of the whole, that we may incur a 589 00:44:14,720 --> 00:44:17,220 remobilization fee as things on roll here. 590 00:44:17,300 --> 00:44:20,380 We're going to have to go back to City Council for approval on this expense. 591 00:44:22,040 --> 00:44:27,180 I guess I have a question in regards to, had we included this in our plans, if Judge 592 00:44:27,180 --> 00:44:33,380 Jimenez had caught this in their early homework, would this cost been about the same? 593 00:44:33,380 --> 00:44:39,720 Are we incurring more, I guess, if we had planned ahead with this cost of bin on that bid or is just more expensive now at 115. 594 00:44:40,080 --> 00:44:45,600 Other than they see the contingency, which is a little high, but the bid have been $100,000 more. 595 00:44:45,820 --> 00:44:53,440 I mean, I guess what I'm getting at is if we're incurring additional costs because of maybe a JJ Venice error and he's not here to defend himself. 596 00:44:53,780 --> 00:44:57,900 But, you know, should they bear some of the burden and the fix? 597 00:44:57,900 --> 00:44:59,820 I think going forward. 598 00:45:00,000 --> 00:45:26,360 We're updating the atlas with Amy's restating of the CIP is a great idea and we infuse those costs into what she's producing to present to you again this summer and put those in as part of the CIP. I think we're going to have to update the atlas and going forward in sections is probably the best. I'm assuming it hasn't been done only twice in the last 40 years because it's probably expensive. I don't know what it would cost to update our atlas all at once or even in sections. 599 00:45:26,360 --> 00:45:40,000 But so I guess I'm a little confused as to is there are we going to incur a mobilization fee are we incurring additional cost to do this main that we wouldn't have of had they had planned ahead with it. 600 00:45:40,820 --> 00:45:49,060 A little bit of a tough question, because I think talking to a contractor, they're always 601 00:45:49,060 --> 00:45:53,860 going to say, well, these are my unit prices, technically we're using unit prices that 602 00:45:53,860 --> 00:45:54,340 they provided. 603 00:45:55,220 --> 00:45:59,480 The flip side of that is if you're going to do 1,000 feet of water man, and then now we're 604 00:45:59,480 --> 00:46:02,700 going to do 1,400 feet of water man, actually, let me see. 605 00:46:03,040 --> 00:46:08,460 We're doing another 400 feet of water man, 420 feet of water man, so that obviously increases 606 00:46:08,460 --> 00:46:17,440 increases the quantity, which you would think then has the potential, and I want to say definitively, but it would have the potential to adjust that price down. 607 00:46:19,180 --> 00:46:20,640 We are, I 608 00:46:22,880 --> 00:46:31,880 don't know what I mean, we're doing 16, 2,320 in about 23, 2,400 feet, so another 400 feet on top of that. 609 00:46:32,100 --> 00:46:38,160 So, I mean, it's certainly not a quantity that is negligible. 610 00:46:38,160 --> 00:46:39,540 I mean, there's a quantity there. 611 00:46:40,240 --> 00:46:41,920 Would there be any remobilization? 612 00:46:42,120 --> 00:46:44,840 I will tell you if, again, bringing this to council 613 00:46:44,840 --> 00:46:46,740 and I understand that our process, 614 00:46:47,080 --> 00:46:49,460 we have to bring this to committee of the hall 615 00:46:49,460 --> 00:46:50,280 and then to council. 616 00:46:50,740 --> 00:46:52,080 If we waited another three weeks, 617 00:46:52,080 --> 00:46:53,640 there is a chance that deconstruction 618 00:46:53,640 --> 00:46:55,820 would be mobilized off of the project 619 00:46:55,820 --> 00:46:57,020 and have to remobilize. 620 00:46:57,120 --> 00:46:59,000 So there may be a remobilization cost 621 00:46:59,460 --> 00:47:01,160 that would become part of the project 622 00:47:01,160 --> 00:47:02,140 that we would not have had. 623 00:47:02,520 --> 00:47:03,400 Wait, it's hard. 624 00:47:05,740 --> 00:47:08,520 You said that this project is on hold right now? 625 00:47:08,520 --> 00:47:10,020 No, it's not. They're working out there. 626 00:47:10,700 --> 00:47:16,020 There's just this this area of section these sections are on hold until we made a decision. 627 00:47:16,140 --> 00:47:20,080 In other words, until we vote on it, well, that's going to be three weeks from now, right? 628 00:47:20,280 --> 00:47:23,220 Well, we can we could put it on City Council tonight. 629 00:47:23,820 --> 00:47:27,480 We could vote on it. Does anybody have any problem putting on City Council tonight? 630 00:47:28,380 --> 00:47:31,500 I think in the end, we're all probably excited and needs to be done. 631 00:47:31,720 --> 00:47:33,600 And I'm not really interested in seeing. 632 00:47:33,880 --> 00:47:37,100 No, I don't want to explain out there on, on residents yards. 633 00:47:37,100 --> 00:47:46,480 because of a procedural thing and then whatever date that is June 7th and then they're back there on June 8th. 634 00:47:46,540 --> 00:47:50,440 I think you're going in the right direction. 635 00:47:50,760 --> 00:47:57,020 We can still listen on that agenda and with your kind of verbal consent today we can continue on. 636 00:47:57,140 --> 00:48:02,780 I mean we've in the past, if you recall, excuse me, we've done work because it was an emergency to do it 637 00:48:02,780 --> 00:48:05,740 and we brought it to you after the fact. I mean this is we're trying to get ahead of it, 638 00:48:05,740 --> 00:48:10,500 But I agree if you're going to hold everything up for three weeks, which could be a month 639 00:48:11,320 --> 00:48:15,480 Those crews could mobilize to another project and then remobilize back and you know 640 00:48:15,480 --> 00:48:20,420 I've been named out be the best idea. You know, this is this is the fourth time in the last three years 641 00:48:21,220 --> 00:48:23,020 We had the Vision Street Bridge 642 00:48:23,700 --> 00:48:27,480 at Ten Street and we had and we had 643 00:48:28,320 --> 00:48:32,540 Ninth and Thorton stop play Ninth and Thorton all came to a halt 644 00:48:33,500 --> 00:48:46,090 We're various reasons, okay, and just such an inconvenience, okay, and so, I mean, I'd 645 00:48:46,090 --> 00:48:52,510 like to vote on this, I'd like to, you know, put it on the agenda and vote on this, you 646 00:48:52,510 --> 00:48:57,470 know, in 20 minutes, you know, instead of just giving a verbal, we're all going to vote 647 00:48:57,470 --> 00:49:02,210 on it anyway. Amy wants to see something. 648 00:49:06,540 --> 00:49:09,560 Would it not be possible just to put it on 649 00:49:09,560 --> 00:49:14,740 consent agenda and give us the go-ahead to give the contractor the. That's a good idea. 650 00:49:18,140 --> 00:49:23,920 Ultimately we have to, can't we have a street open. I mean we have to do something. I'm willing 651 00:49:23,920 --> 00:49:30,760 to put it on the consent agenda for June 7th meeting. I just want to ask one good one question 652 00:49:30,760 --> 00:49:30,980 here. 653 00:49:33,200 --> 00:49:40,900 On Jefferson Street, running north and south over division, that's the four-inch line that we're going to abandon. 654 00:49:41,360 --> 00:49:42,180 On the right in the middle. 655 00:49:42,660 --> 00:49:42,900 Correct. 656 00:49:43,160 --> 00:49:51,980 Okay, it looks like the new line that we're proposing to put in the eight-inch line is eventually going to tie into that four-inch line or correct me if I'm wrong. 657 00:49:52,340 --> 00:49:56,760 We're going to continue four-inch farther south on Jefferson. 658 00:49:59,240 --> 00:50:06,620 We have talked about that and Scott can I have you or Amy? I know we have talked about this one. Yes, there is an existing 659 00:50:06,620 --> 00:50:17,760 Forage line on Jefferson south of division that we will be tying back into. Okay, that section of Jefferson Street is in the CIP in a later year to be 660 00:50:17,760 --> 00:50:22,820 Replay and we would be able to replace that forage line at that time when we reconciled on the water at list for that job. 661 00:50:26,900 --> 00:50:32,920 Okay, so we are temporarily tying into a four inch line even though we know that's kind of way. 662 00:50:33,500 --> 00:50:39,160 I mean, if I understand correctly, we really don't have to do this repair. 663 00:50:39,920 --> 00:50:45,160 I mean, really don't, I mean, if we would accept four inch as being, you know, water main 664 00:50:45,160 --> 00:50:51,000 that's good enough to handle the job, but we, most cases, I think people in the industry 665 00:50:51,000 --> 00:50:56,260 realize four inches not the right way to go. So that's why we're correcting it. But we 666 00:50:56,260 --> 00:51:00,240 could just say I don't even want to do that and just leave it the way it is. I mean, technically, 667 00:51:00,380 --> 00:51:06,100 correct? Good. So we're choosing to do the right way. That's correct. But we're trying to do it 668 00:51:06,100 --> 00:51:10,840 the right way and then attaching back into four inch. Hopefully that will pair in the future. That's 669 00:51:10,840 --> 00:51:19,540 correct. Yes. Now the other job, the Washington Street. Yes. Now the line we're missing there 670 00:51:19,540 --> 00:51:27,600 There is the one, I've seen there's two water lines running east and west on division. 671 00:51:27,960 --> 00:51:30,420 One on the north side of the street, one on the south side of the street. 672 00:51:31,360 --> 00:51:36,480 There is currently one right, about right down the middle of the street. 673 00:51:36,980 --> 00:51:40,720 We thought it was on the south side of the road and it is not on the south side of the road. 674 00:51:40,720 --> 00:51:44,780 It's running closer down to the middle of that road on division. 675 00:51:45,200 --> 00:51:48,360 What we're going to do is we're going to propose to put it on the north side of the road. 676 00:51:48,360 --> 00:51:56,940 So we're seeing all the water main leaks, it's from the existing mine. 677 00:51:58,260 --> 00:52:01,240 And how far west on division is that running? 678 00:52:01,380 --> 00:52:03,240 How far down the street are we having breaks? 679 00:52:04,140 --> 00:52:06,340 A long way, a lot farther than what we're fixing. 680 00:52:07,420 --> 00:52:08,840 So is it put that in Spain in? 681 00:52:09,700 --> 00:52:11,920 So and you're absolutely correct. 682 00:52:12,100 --> 00:52:17,860 We already had that on another project up on McGregor and North where we were done. 683 00:52:17,860 --> 00:52:22,000 We were replaced it just on the other side of our tie-in point the main broke 684 00:52:22,500 --> 00:52:27,460 Okay, I mean you have to stop somewhere that but you're absolutely right. I mean, yeah every it 685 00:52:27,460 --> 00:52:31,000 Water that's that's the good thing about water. It's also where the problems are 686 00:52:33,060 --> 00:52:38,140 Well with with the restated CIP that we're gonna be presenting later this year. These are kind of questions and 687 00:52:38,140 --> 00:52:44,080 Things that you can pose where you can move if this other four inch main the rest of it is in 2020 688 00:52:44,080 --> 00:52:46,060 20, you could move it up to 2018. 689 00:52:46,080 --> 00:52:48,440 It's just what do you kick out, right? 690 00:52:48,560 --> 00:52:50,440 I mean, because there's only so much money available each year. 691 00:52:50,560 --> 00:52:52,960 And that's where Amy uses a lot of different priorities 692 00:52:52,960 --> 00:52:54,740 to set when things are done. 693 00:52:54,900 --> 00:52:56,220 I mean, we all look at some of these streets 694 00:52:56,220 --> 00:52:58,180 and say, why is this one being done versus others? 695 00:52:58,180 --> 00:52:59,560 And there's always a reason. 696 00:53:00,980 --> 00:53:02,540 But yeah, unfortunately, it's just not enough money 697 00:53:02,540 --> 00:53:03,820 to go around to do it all at once. 698 00:53:04,380 --> 00:53:07,140 OK, so the couple of things on the table then. 699 00:53:07,140 --> 00:53:15,920 And one, I think is the, we don't want to hold the project up for procedure. 700 00:53:16,380 --> 00:53:17,640 I think we all agree it needs to be done. 701 00:53:18,300 --> 00:53:19,720 And yes, it's where do you stop? 702 00:53:19,980 --> 00:53:22,620 We can always, there's always going to be a forage man that we stop at. 703 00:53:23,080 --> 00:53:26,260 We can't afford to replace it all at once. 704 00:53:27,400 --> 00:53:32,420 So we have to stop somewhere and then we'll pick up again and that's just understood. 705 00:53:34,800 --> 00:53:43,180 So, I think whether we do it on a consent agenda for next week, whatever it's going to keep it rolling is what's most important to me right now. 706 00:53:43,380 --> 00:53:50,260 So, if a consent agenda is enough of a message to send to the industry that says you guys can keep rolling, I'm okay with that. 707 00:53:50,260 --> 00:54:14,000 Then the second side of this is, you know, kind of the plan of attack for how we deal with, you know, our atlas and how we get ahead of these projects before they're designed, because I'm sure JJ Beness, I'm not here to carry the water, but they'll just say, as Atlas, I was given, man, you know, so are they responsible for locating it during the design process. 708 00:54:14,000 --> 00:54:19,640 So then maybe that is the kind of I think the problem been alluded to if they just go off of what we give them 709 00:54:19,640 --> 00:54:23,060 It's really hard to you know to the wall for something 710 00:54:23,060 --> 00:54:31,260 But all that kind of stuff I think you know we look forward to you clearing up so that we stop having these kinds of issues in the future 711 00:54:32,240 --> 00:54:37,360 When we bid out jobs in the future or design jobs in the future can we I mean 712 00:54:38,120 --> 00:54:41,420 Do I understand properly that if we say let's say we're going to use J.J. 713 00:54:41,420 --> 00:54:47,000 events again. When you say I want to do so and so straight between this block and this 714 00:54:47,000 --> 00:54:53,660 block, don't you pay for what you want. I mean, if you say I want every manhole opened, 715 00:54:53,780 --> 00:55:00,600 I want the whole inspection during your design, that's one way to ask them to bid their design. 716 00:55:01,320 --> 00:55:06,180 The other way is you could say, give me, you don't have to open up. We're going to assume 717 00:55:06,180 --> 00:55:14,900 this and this and this. So how do we want to move? Can't you ask for like a cheaper design or more expensive design in the process? 718 00:55:15,520 --> 00:55:22,020 You could. I mean, absolutely. If you're handing them all this information, you're saying this is going to be your base. This is going to be your base map. Absolutely. 719 00:55:22,340 --> 00:55:31,720 I would expect that price to be significantly lower because there is a lot of surveying, upfront surveying, again, investigation time. So, yeah, absolutely. 720 00:55:31,720 --> 00:55:37,140 So let's kind of answer Daren's question, like, how do you, you know, jobs in the future? 721 00:55:37,320 --> 00:55:41,320 How do we trust the, I mean, basically, I mean, when we go to design the next job, 722 00:55:41,520 --> 00:55:44,340 I mean, you can do it the thorough way at that time. 723 00:55:44,600 --> 00:55:52,260 It's not like we need to water Atlas as, you know, today, I mean, but as we move forward, 724 00:55:52,600 --> 00:55:54,700 I mean, you can determine what's there and what's not there. 725 00:55:54,700 --> 00:56:24,160 And in one way that staff is done a very good job of collecting information because we have a lot of good information over the past, I'll say five, six, seven years where we've gotten a lot of record drawings as bolts, we've gotten a lot of of our own work that's been done a lot of record keeping now we just have to figure out a way to not I don't want to say figure out we have to determine the best way to move forward with putting that information down on paper because again we have a 2007 paper 726 00:56:24,160 --> 00:56:29,920 map that has nothing from that point on that we have we you know we take our 727 00:56:29,920 --> 00:56:33,260 best notes that we can again staff has done the best they can I think with putting 728 00:56:33,260 --> 00:56:37,100 those on paper and we have some internal maps that are farther along in these 729 00:56:37,100 --> 00:56:40,980 external but we need to figure out a way now again my biggest thing is if we're 730 00:56:40,980 --> 00:56:46,620 gonna hand these things out I want to have some you know ability to say yeah 731 00:56:46,620 --> 00:56:52,040 these are accurate if not I don't I don't trust handing them out quite 732 00:56:52,040 --> 00:56:56,300 honestly. And so that's where it's at. I do want to, the other quick thing I do want to mention, 733 00:56:56,480 --> 00:57:04,760 I did not go over this, but we budgeted $1,666,000 as part of this project. The bids came in a little 734 00:57:04,760 --> 00:57:11,380 under a million four. So we had, we did have some excess funds. We had about $290,000. That was 735 00:57:11,380 --> 00:57:18,800 budgeted versus what was actually awarded. We're asking for $115,000 to be, you know, as part of 736 00:57:18,800 --> 00:57:24,000 this project. So again, we're, I understand, I don't want to, I don't want to make it sound 737 00:57:24,000 --> 00:57:27,720 like, yeah, this is money that was there. This is just fun money. That's not the way that 738 00:57:27,720 --> 00:57:32,520 I'm approaching this. But we did have a budget and the award came in underneath that budget. 739 00:57:32,520 --> 00:57:36,720 So we do have some funds that were available as part of this budget. 740 00:57:37,000 --> 00:57:40,600 Okay. And I'll tell you what, Brent, that's important to us. The idea that hey, we came in 741 00:57:40,600 --> 00:57:44,320 under budget. So it's all good. That's not the way we want to operate. And I appreciate 742 00:57:44,320 --> 00:57:45,600 that you see it that way, too. 743 00:57:46,360 --> 00:57:46,520 Okay. 744 00:57:47,340 --> 00:57:48,400 Guys, one more final thing. 745 00:57:48,560 --> 00:57:48,840 Of course. 746 00:57:49,020 --> 00:57:52,780 Do you feel that Alderman Patrocos, you know he's not here, 747 00:57:52,940 --> 00:57:55,000 that his questions were answered tonight? 748 00:57:55,420 --> 00:57:57,660 Or do you think we need to ask anything else? 749 00:57:58,200 --> 00:58:00,600 I think we're going to have quite a few Morgan discussions 750 00:58:00,600 --> 00:58:02,520 with Alderman Patrocos on this issue. 751 00:58:02,700 --> 00:58:05,260 And I'd be glad to invite him to our meeting with JJ Venice. 752 00:58:05,280 --> 00:58:07,740 And if we're going to go for consent and move this along 753 00:58:07,740 --> 00:58:08,680 for the good of the project, 754 00:58:08,880 --> 00:58:11,420 I'd be happy to involve him as an architect. 755 00:58:11,420 --> 00:58:13,720 He knows how to read plans and be involved. 756 00:58:13,720 --> 00:58:16,700 and we can speak to JJ Benis in regards to our expectations. 757 00:58:17,900 --> 00:58:23,120 We'll probably be going out for another RFQ in regards to inviting companies and firms 758 00:58:23,120 --> 00:58:27,740 on who we work with and we want to make sure we set the expectations that this is old infrastructure 759 00:58:27,740 --> 00:58:33,520 and we do need support and help in verification or where things are and as we update our address 760 00:58:33,520 --> 00:58:35,240 and I think the pot holding is an excellent idea. 761 00:58:36,720 --> 00:58:38,700 So yeah, I think we'll involve him. 762 00:58:39,000 --> 00:58:39,680 Okay, thank you. 763 00:58:40,400 --> 00:58:42,640 Instead of the public meetings with him, we'll have him with the private meetings. 764 00:58:43,120 --> 00:58:48,400 All right, so in the meantime were we okay with putting it on the consent for the June meeting first week of June? 765 00:58:49,920 --> 00:58:53,840 Okay, all right, so we'll do that and that should keep the project rolling then everyone 766 00:58:55,920 --> 00:58:59,640 See the problem is Gordy was the human atlas, right? 767 00:59:00,220 --> 00:59:02,840 If I knew it all I know where that water might was. Yeah, so 768 00:59:06,980 --> 00:59:08,500 All right everyone thanks 769 00:59:09,420 --> 00:59:14,510 All right any new business that anyone have all good 770 00:59:14,530 --> 00:59:18,310 All right, then we're just looking for a motion to adjourn. 771 00:59:18,450 --> 00:59:20,110 Really quickly, just an update. 772 00:59:20,330 --> 00:59:26,070 There is Memorial Day Services that will be occurring in town, 9 o'clock at the Lockport 773 00:59:26,070 --> 00:59:29,310 Cemetery, which is next to St. Joe's Church, that same church. 774 00:59:29,790 --> 00:59:35,590 We'll be closing off the road there in front for about an hour or so to just heads up for people to live nearby. 775 00:59:36,290 --> 00:59:39,610 Yeah, I think it's going to be a really interesting Memorial Day service. 776 00:59:39,770 --> 00:59:41,130 We tried to change gears a little bit. 777 00:59:41,130 --> 00:59:49,010 It was about kind of going back to the roots of Memorial Day, when it was a remembrance day, 778 00:59:49,150 --> 00:59:56,090 when after the Civil War folks would go out to the graves of their loved ones who fell 779 00:59:56,090 --> 00:59:58,790 during that war, and they would go decorate their graves. 780 01:00:00,000 --> 01:00:21,880 We thought of doing something similar this year. We have veterans all the way back to the War of 1812 and the Lockport Cemetery. And so starting with the folks we know who are there and having some direction and having a ceremony there and letting people go out and visit those graves, I think is a good and proper way to celebrate Memorial Day. 781 01:00:21,880 --> 01:00:27,360 So the one thing maybe we could request, and maybe we could put this in the paper. 782 01:00:27,940 --> 01:00:31,980 We do not know all the people that are currently there that are veterans. 783 01:00:32,760 --> 01:00:35,080 Ramlith has found about 80 right now. 784 01:00:35,640 --> 01:00:38,820 We're working on, it's time consuming, very time consuming. 785 01:00:39,480 --> 01:00:44,520 Bob and him will be meeting on Friday the 19th to start putting the flags up. 786 01:00:44,740 --> 01:00:45,880 We've never done this before. 787 01:00:46,040 --> 01:00:47,960 We do not know how much time that would take. 788 01:00:48,620 --> 01:00:50,620 The Boy Scouts will be helping us too. 789 01:00:50,620 --> 01:00:57,320 So there's a whole bunch of people doing this. The cemetery has, I believe, 80 or 8,000 790 01:00:57,320 --> 01:01:01,780 grapes there. So this is large. When you don't know where someone is located, then to 791 01:01:01,780 --> 01:01:07,260 put a flag up. So this would have to start small and then build. But I think we should also 792 01:01:07,260 --> 01:01:11,140 include something in the paper saying if you have a family member that you want to flag 793 01:01:11,140 --> 01:01:16,660 so we don't leave somebody out. Because right now we're just picking the ones we had time 794 01:01:16,660 --> 01:01:25,420 to find. Okay thank you all right everyone anything else okay look at for a 795 01:01:25,420 --> 01:01:34,200 motion to adjourn Rene seconded by Joanne all in favor all right okay do you guys 796 01:01:34,200 --> 01:01:43,540 need to break you want to roll through okay all right so city council just 797 01:01:43,540 --> 01:01:45,240 Tell us when you're ready and we'll get going.