[0:30] I should have put it over the water. [1:16] Hello and welcome to the Longview MPO's [1:18] 10-day public comment period kickoff [1:20] meeting. My name is Cal Magou, I'm a [1:22] senior transportation planner with the [1:23] Longview MPO. [1:26] Uh we are welcoming public comment and [1:28] review for the draft 2027 to 2030 [1:30] transportation improvement program, also [1:32] known as the TIP. [1:36] What is the transportation improvement [1:37] program? It is a list of local projects [1:39] to be funded within the Longview MPO [1:41] area during the next 4 years, including [1:43] those eligible for federal funding. [1:46] It can include projects for mobility, [1:48] pedestrian and bike, transit, and [1:50] freight. And it shows a regional [1:52] agreement on the need of a project. [1:57] So, funding can come through three [2:00] sources for these projects, the federal [2:01] government, local governments, and [2:03] TxDOT. It's a fiscally constrained list [2:06] of projects, [2:08] and fiscally constrained means it's [2:09] realistic in terms of the amount of [2:11] funding available, meaning [2:13] the funding of these projects will not [2:15] exceed the funding that is available. [2:20] And so, in this TIP document, there are [2:23] two different kinds of projects. There's [2:25] the regionally significant projects, [2:26] which could be mobility and bicycle and [2:28] pedestrian projects, and these are [2:30] projects that are significant enough to [2:33] require their own stand-alone status. [2:35] Then there's group projects that don't [2:37] have the scale to stand on their own, [2:39] and they can be grouped into one of 12 [2:40] subcategories. [2:44] So, this is a map that shows the [2:46] location of these projects for the 2027 [2:48] to 2030 transportation improvement [2:50] program. The red line are the mobility [2:53] projects, the more significant projects, [2:55] and the blue is the group projects. [3:01] » [snorts] [3:02] >> So, the first of the mobility projects, [3:04] or the more significant, is State [3:07] Highway 42 widening, [3:09] and it is from US Highway 80 to [3:11] Interstate 20, [3:13] and it's going to be widening from two [3:14] to four lanes with a center turn lane, [3:16] and it's coming in at $164 million and [3:18] $80,000. [3:22] The next is Loop 485 in Gladewater, and [3:25] this is a $15 million $80,000 project, [3:28] and it's from US 80 in Gladewater to US [3:31] 271. [3:36] And then the third and last mobility [3:38] project is US 271, and it's coming in at [3:41] 12 million 12 million 168,000, [3:44] and it's from the Upshur County line to [3:47] 0.1 miles north of FM 2275 [3:50] south to South loop 485 in Gladewater. [3:55] Or state loop 485, excuse me. [4:02] And then the rest of the projects, the [4:03] group projects that were illustrated by [4:05] the blue in the map, there's 18 of them [4:07] and they consist of seal coats, [4:09] lighting, bridge maintenance, sidewalks, [4:11] medians, and overlays. [4:14] >> [snorts] [4:17] » And then the document also includes [4:19] transit projects. [4:22] And for 2027, there's $6,451,614 [4:27] allocated. [4:28] In 2028, there's $3,340,000 [4:32] allocated. In fiscal year 29, there's [4:35] $3,550,000 [4:37] allocated. And in fiscal year 30, [4:39] there's $3,577,500 [4:44] allocated. [4:50] To visit to view the full draft [4:52] document, please visit our website [4:54] www.longviewtexas.gov/mpo. [5:02] And how to provide your comments, you [5:03] can mail your comments to the Longview [5:05] MPO PO Box 1952 Longview, Texas 75606. [5:10] You can email your comments to [5:12] mpo@longviewtexas.gov [5:15] or you can call and share your comments [5:16] with us at 903-237-1062. [5:21] And please remember to submit your [5:23] comments by April 8th to be included in [5:26] the official summary of this meeting.