1 00:00:00,000 --> 00:00:19,000 Comments are to be addressed to the chair or specific member of the commission. These hearings are recorded and broadcast on public access, television, audio tapes and other relevant public records are available in the city-playing office or on the cities web website at www.nola.gov. 2 00:00:20,340 --> 00:00:27,640 The first order of business is adoption of the minutes of the July 14th, 2026 meeting. 3 00:00:39,880 --> 00:00:44,740 I don't have a screen, let's go with hands, 4 00:00:46,800 --> 00:00:52,060 we have, okay, let's go short agenda and we can all raise our hands. 5 00:00:52,060 --> 00:00:56,860 So, a motion and a second for the minutes, all in favor? 6 00:00:57,480 --> 00:00:58,120 Hi. 7 00:00:59,320 --> 00:01:01,140 That's five, any opposed? 8 00:01:02,160 --> 00:01:02,180 None. 9 00:01:02,940 --> 00:01:03,680 The minutes pass. 10 00:01:04,680 --> 00:01:09,600 The next DACA item is DACA item 0, 7, 3, 26. 11 00:01:11,840 --> 00:01:17,340 Zoning DACA 0, 7, 3, 2, 6 is a request for a planned development to permit the 12 00:01:17,340 --> 00:01:23,360 former forensic skincare Claire's monastery into multi-family residential dwellings within the 13 00:01:23,360 --> 00:01:29,040 H2RD2 district and the CPC character preservation court or design overlay district. This 14 00:01:29,040 --> 00:01:33,980 request was referred at the July 14th meeting to allow additional time for review. The 15 00:01:33,980 --> 00:01:38,800 physician site is located as 720 Henrikley Avenue in occupies an entire city block 16 00:01:38,800 --> 00:01:44,760 bounded by magazine street, hemricley Avenue, constant street, and cow food street. The site 17 00:01:44,760 --> 00:01:48,760 This currently developed at the St. Clair Monastery Campus, which contains the Historic 18 00:01:48,760 --> 00:01:53,820 Monastery Building in Firmary, Accessory Structures, surface parking areas, landscape 19 00:01:53,820 --> 00:01:59,240 open space and masonry walls on the perimeter surrounding the entire property. The proposal 20 00:01:59,240 --> 00:02:05,360 with preserve and rehabilitate the Historic Monastery Building while constructing two new residential 21 00:02:05,360 --> 00:02:10,760 buildings. The demolition of Select Monastery Historic Accessory Structures, new internal 22 00:02:10,760 --> 00:02:16,480 circulation and parking areas and landscape open space to be accessible to the public and 23 00:02:16,480 --> 00:02:22,240 other associated site improvements. Together, the three buildings would provide 24 residential 24 00:02:22,240 --> 00:02:27,700 units, eight in each building, organized around a central landscape courtyard that is proposed to 25 00:02:27,700 --> 00:02:34,020 function as a publicly accessible park. The plans and ballot map process is intended to facilitate 26 00:02:34,020 --> 00:02:39,260 the adaptor reuse of historic institutional structures by allowing flexibility from certain 27 00:02:39,260 --> 00:02:44,600 zoning regulations where a appropriate staff finds that their proposal 28 00:02:44,600 --> 00:02:49,580 reserves the monastery as a defining architectural feature of the site while 29 00:02:49,580 --> 00:02:54,780 returning a long vacant institutional campus to productive residential use. 30 00:02:55,440 --> 00:02:59,680 The proposal includes residential buildings with an excellent height of approximately 31 00:02:59,680 --> 00:03:06,420 49 feet, where the underlying zoning district permits a maximum height of 35 feet. 32 00:03:06,420 --> 00:03:10,980 staff finds that the additional height can be appropriate provided the new construction remains 33 00:03:10,980 --> 00:03:17,500 supported to the historic monastery. As discussed through the HDSC process, staff supports 34 00:03:17,500 --> 00:03:21,240 refinement of the building massings so that the taller questions of the new buildings 35 00:03:21,240 --> 00:03:27,340 and oriented toward the interior of the development and our further differentiated 36 00:03:27,340 --> 00:03:32,860 from the historic structure reinforcing the monastery as the primary architectural feature of the campus. 37 00:03:32,860 --> 00:03:40,340 This proposal also provides 61 parking spaces where 65 are required under the University area 38 00:03:40,340 --> 00:03:46,320 or Austrian parking overlay district. Staff supports these exceptions because requiring full 39 00:03:46,320 --> 00:03:50,420 compliance to reduce the site's planned green space in landscaping, which are essential 40 00:03:50,420 --> 00:03:55,720 to the design concept and public benefits of the planned development. The proposal for 720 41 00:03:55,720 --> 00:04:01,600 hammer clay is consistent with the master plan and preserves a designated local landmark and 42 00:04:01,600 --> 00:04:03,720 compatible with the surrounding neighborhood. 43 00:04:05,260 --> 00:04:06,860 Therefore, staff recommends approval. 44 00:04:10,300 --> 00:04:14,160 Were there any provisos or waivers included? 45 00:04:14,900 --> 00:04:14,960 Yes. 46 00:04:15,300 --> 00:04:17,420 With three exceptions in one provisos. 47 00:04:17,700 --> 00:04:19,060 Thank you. 48 00:04:20,740 --> 00:04:22,000 I have one card. 49 00:04:22,340 --> 00:04:23,900 Ron Lothel. 50 00:04:24,360 --> 00:04:26,980 Ron Lothel, one thousand self-dormancy Francis. 51 00:04:28,560 --> 00:04:32,000 Thank you commissioners for coming here today for all the work that you do. 52 00:04:32,000 --> 00:04:36,680 I'd like to give a little background on this project, if possible, first of all, 53 00:04:36,820 --> 00:04:44,060 acknowledgement to the sisters who have been guardians and great keepers of this property for so many years. 54 00:04:45,340 --> 00:04:53,240 I am sure this is an emotional day, but they have been working very hard to see that their legacy 55 00:04:53,240 --> 00:04:58,700 is kept in this property moving forward. I'd also like to acknowledge Tony Gellerman, 56 00:04:58,700 --> 00:05:01,560 who is our developer of this property. 57 00:05:02,260 --> 00:05:04,820 You know, we're here today on a very big project 58 00:05:04,820 --> 00:05:07,280 and you see what's behind us. 59 00:05:07,580 --> 00:05:12,440 You know, Tony met with the neighbors numerous times 60 00:05:12,960 --> 00:05:16,880 before the conditional use or the text amendment process 61 00:05:17,780 --> 00:05:19,340 became into play. 62 00:05:19,600 --> 00:05:21,980 So he had worked hard with the neighbors. 63 00:05:22,860 --> 00:05:27,900 Everyone that's been involved in this is CPC staff. 64 00:05:27,900 --> 00:05:34,720 numerous meetings, zoning staff, housing staff, safety and permits, council office, 65 00:05:35,100 --> 00:05:41,620 HDLC. We aren't just showing here coming up in front of you. Hey, here's what we're doing. 66 00:05:41,940 --> 00:05:48,780 This has been highly vetted and has been worked on tremendously, including the council office. 67 00:05:48,920 --> 00:05:54,200 I don't want to exclude the council office. So this has been all hands working together to 68 00:05:54,200 --> 00:05:59,720 this project move forward. And in your last CPC meeting, you are the first key part of moving 69 00:05:59,720 --> 00:06:05,020 the legislation forward when you approve the tax amendment, which allowed this process to move 70 00:06:05,020 --> 00:06:10,820 forward. Of course, all goes through the city council, but again, it has been a collaborative effort. 71 00:06:10,980 --> 00:06:17,580 This is an excellent, excellent addition to the city of New Orleans. And we look forward to 72 00:06:17,580 --> 00:06:23,640 your approval on this. I would just like before I end that we make sure and clarify what the 73 00:06:24,220 --> 00:06:28,180 and the exceptions are before we vote, thank you. 74 00:06:28,840 --> 00:06:31,480 When we're done, I'll ask you to read them out loud. 75 00:06:32,200 --> 00:06:34,980 Are there any other speakers in support? 76 00:06:37,040 --> 00:06:38,400 I don't have any cards in opposition. 77 00:06:38,660 --> 00:06:39,860 I have one other card. 78 00:06:40,560 --> 00:06:43,280 Ms. Johnson said you didn't want to speak, 79 00:06:43,840 --> 00:06:46,460 and do you want me to read into the record? 80 00:06:46,760 --> 00:06:48,480 So I'll just enter your card into the record. 81 00:06:49,100 --> 00:06:49,580 Okay, great. 82 00:06:50,160 --> 00:06:51,320 So there's no opposition. 83 00:06:51,320 --> 00:06:57,420 Anybody else in opposition here or anybody in opposition because Ms. Johnson was for information 84 00:06:57,420 --> 00:07:01,280 So there's no need for a bottle because there's no 85 00:07:01,280 --> 00:07:02,300 opposition 86 00:07:03,400 --> 00:07:05,460 Can you read the the 87 00:07:05,460 --> 00:07:08,340 Provisors and the if on the waivers? 88 00:07:08,860 --> 00:07:11,320 Yes, the there are 89 00:07:12,240 --> 00:07:15,120 Two exceptions included in the report 90 00:07:15,120 --> 00:07:19,260 The first one speaks to the Austrian parking. 91 00:07:19,360 --> 00:07:25,500 It says the developer shall be granted an exception to Article 18, Section 18.30.E, 92 00:07:25,700 --> 00:07:30,640 Austrian parking requirements of the comprehensive zoning ordinance, which requires 65 parking spaces 93 00:07:30,640 --> 00:07:33,600 to require only 61 parking spaces to be provided. 94 00:07:34,060 --> 00:07:40,460 The second exception says the developer shall be granted an exception of Article 22, Section 22.7, 95 00:07:40,460 --> 00:07:46,120 required all-street loading spaces of the comprehensive setting ordinance, which requires one 96 00:07:46,120 --> 00:07:53,660 off-street loading space to require no loading spaces to be provided. The third exception that we 97 00:07:53,660 --> 00:08:04,510 spoke to in the presentation is regarding the height. The proposed height is 49 feet while the 98 00:08:04,510 --> 00:08:07,590 to Rd2 district only allows for 35 feet. 99 00:08:09,350 --> 00:08:12,950 And so we will be including the 30 session 100 00:08:12,950 --> 00:08:15,250 in the final report. 101 00:08:15,670 --> 00:08:18,950 And then the profile zone that is in the report 102 00:08:18,950 --> 00:08:22,270 is the Department of Safety and Permit Show 103 00:08:22,270 --> 00:08:24,250 issue no building permits or licenses 104 00:08:24,250 --> 00:08:27,330 for this project until final development plans are approved 105 00:08:27,330 --> 00:08:28,730 by the City Planning Commission 106 00:08:28,730 --> 00:08:31,930 and recorded with the Office of Commaices. 107 00:08:31,930 --> 00:08:49,930 Failure to complete the conditional use process by properly recording plans within one year time period or failure to request an administrative extension as provided for an article for section 4.3 each of the comprehensive zoning ordinance will avoid the conditional use approval. 108 00:08:50,530 --> 00:08:51,930 Great. Thank you. 109 00:08:53,610 --> 00:08:57,150 That closes the public hearing. So I'm looking for a motion. 110 00:08:59,520 --> 00:09:02,700 I'll make a motion to approve subject to the 111 00:09:02,700 --> 00:09:03,920 provide the exceptions in the provide. 112 00:09:04,400 --> 00:09:05,520 Thank you. 113 00:09:05,820 --> 00:09:07,580 Second, five commissioner A.B. 114 00:09:07,980 --> 00:09:09,420 Commissioner Keper made the motion. 115 00:09:10,400 --> 00:09:11,380 There's a motion on the floor. 116 00:09:11,720 --> 00:09:14,040 If there's no discussion, we'll call for the vote. 117 00:09:14,540 --> 00:09:15,100 All in favor? 118 00:09:15,920 --> 00:09:16,160 Aye. 119 00:09:17,280 --> 00:09:18,080 That's it. 120 00:09:18,080 --> 00:09:18,620 Any opposed? 121 00:09:18,960 --> 00:09:19,520 Any nays? 122 00:09:20,180 --> 00:09:20,320 Nine. 123 00:09:21,540 --> 00:09:22,320 Five to zero. 124 00:09:22,460 --> 00:09:23,240 The motion passes. 125 00:09:23,240 --> 00:09:24,600 Looks like a great development. 126 00:09:24,760 --> 00:09:25,420 So congratulations. 127 00:09:26,620 --> 00:09:35,200 And then let me just note that Susan Johnson submitted a card has a comment on the back and the comment will be entered into the record. 128 00:09:39,490 --> 00:09:41,490 Move on to the next DACA item. 129 00:09:44,450 --> 00:09:47,510 DACA item 03626. 130 00:09:48,550 --> 00:10:11,010 Zoning DACA 03626 is a request-specific council motion for a text amendment to the CZO to define data centers and any related uses to consider whether these should be permitted or conditional in any zoning district or overlay and to implement appropriate use and design standards for the use is not limited to density requirements, soundproofing and safety measures and other regulations necessary. 131 00:10:14,500 --> 00:10:29,660 Staff quickly concluded that the data center uses an atypical one from what usually goes through CPC and that there is a large variation in intensity based on the size and scale of the use and the impacts from data centers are not just hyperlocal land use impacts 132 00:10:29,660 --> 00:10:42,500 Like occupancy traffic, building design and lighting, but can be much broader impacting local supplies of energy or water and potentially creating major air quality, noise or water quality issues for nearby residents. 133 00:10:43,060 --> 00:10:53,280 And the greatest impacts come from the really large facilities with power generation on site and or liquid cooling facilities on site was the called hyper scale facilities. 134 00:10:53,280 --> 00:10:58,300 So, to inform the recommendations and reports, staff reviewed zoning and land use regulations 135 00:10:58,300 --> 00:11:02,560 across the country, either from county, state, or local government, staff found that 136 00:11:02,560 --> 00:11:03,520 regulations vary. 137 00:11:03,760 --> 00:11:09,100 Some cities or states or counties at more Tories on data centers, either entirely or beyond 138 00:11:09,100 --> 00:11:13,360 some kind of threshold, like 10,000 square feet or 50 megawatts of power. 139 00:11:13,700 --> 00:11:18,780 But there are different approaches across the country as the demand for data centers has significantly 140 00:11:18,780 --> 00:11:20,660 increased in the past few years. 141 00:11:22,040 --> 00:11:27,720 So recommendation, staff recommends setting a scale for data center based by establishing 142 00:11:27,720 --> 00:11:32,160 four main categories based on square footage and energy consumption. 143 00:11:32,940 --> 00:11:37,240 Staff looked at data center regulations from other places to inform the thresholds along 144 00:11:37,240 --> 00:11:40,020 with research on existing data center providers. 145 00:11:40,720 --> 00:11:46,800 So the categories would be accessory, small, medium, or large, or hyper scale. 146 00:11:47,440 --> 00:11:52,140 Accessory data centers would serve a primary use at a site and would be no larger than 147 00:11:52,140 --> 00:11:59,040 2,000 square feet and would take up no more than 25% of the gross floor area of the primary use. 148 00:11:59,860 --> 00:12:07,120 Small data centers would be allowed up to 20,000 square feet with no greater than 5 megawatts of power. 149 00:12:07,680 --> 00:12:15,100 Medium data centers would be allowed up to 100,000 square feet and no greater than 20 megawatts of power consumption. 150 00:12:15,100 --> 00:12:23,120 large or hyperscale is anything beyond the medium threshold which would be prohibitive 151 00:12:25,620 --> 00:12:34,750 citywide use permissions overall small or medium data centers would be conditionally 152 00:12:34,750 --> 00:12:41,830 allowed across districts in articles 15, 16 and 17 in the commercial center areas and 153 00:12:41,830 --> 00:12:52,030 institutional campus district small would be conditionally loud in C1, C2, C3, EC, MC, MS, or LS. 154 00:12:55,870 --> 00:13:13,410 In Article 16 centers for industry small and medium data centers would be conditionally allowed in LI, light industrial, HI, heavy industrial, MI, maritime industrial and BIP business industrial park district. 155 00:13:13,410 --> 00:13:30,510 In Article 17, the central business district small would be conditionally allowed in CBD 1, CBD 2, CBD 3, CBD 4, and CBD 7, and medium would be conditionally permitted in CBD 7. 156 00:13:30,670 --> 00:13:33,350 We can take a look at the map on the next slide. 157 00:13:35,350 --> 00:13:42,770 Here you can see in red and blue, the commercial center areas that would conditionally allow small data centers. 158 00:13:42,770 --> 00:14:00,070 The purple color includes L-I-H-I-I-M-I and B-I-P districts that would support small or medium conditionally and the gray area on the map shows the areas within and around the CBD that would permit small as conditionally use. 159 00:14:00,530 --> 00:14:08,210 This gray area also includes the CBD-7 area, which would allow medium sized data centers conditionally. 160 00:14:09,270 --> 00:14:14,990 standards. As we were looking at the data center use type, we realized there are a series 161 00:14:14,990 --> 00:14:20,670 of procedural considerations for the use that are atypical. A new data center would require 162 00:14:20,670 --> 00:14:26,010 a review in consideration from energy, potentially sewage and water board, certainly the 163 00:14:26,010 --> 00:14:30,950 building permits division and so we decided to stipulate these initial considerations as part 164 00:14:30,950 --> 00:14:37,970 of the use standards. So first, all data center applications for conditional use must be pre-reviewed 165 00:14:37,970 --> 00:14:48,350 by Kuro, and to introduce Swishin Waterboard and a statement of review by those agencies must be provided to CPC before an application can be made to us. 166 00:14:48,930 --> 00:14:57,750 Second, each application would be required to include a general impact assessment to provide information on electrical load, water usage, 167 00:14:57,750 --> 00:14:59,910 expected noise levels and it is 168 00:15:00,000 --> 00:15:05,680 The description of the mitigation efforts to be undertaken. The building and site design is largely 169 00:15:05,680 --> 00:15:11,160 similar to other industrial permitted use types, which are required to comply with the underlying 170 00:15:11,160 --> 00:15:18,580 zoning districts regulations for bulk, yard design and landscaping. Staff includes density and 171 00:15:18,580 --> 00:15:25,300 distance restrictions. First, all data centers must be 500 feet, which is roughly three 172 00:15:25,300 --> 00:15:28,540 blocks from all residentially zoned properties. 173 00:15:29,420 --> 00:15:36,540 In industrial districts, LI, HIV, MI, and VIP, data centers must also be 500 feet from 174 00:15:36,540 --> 00:15:40,360 one another to limit any proliferation in a certain district. 175 00:15:41,000 --> 00:15:46,380 And in the CBD, only one data center is permitted per building to limit the potential for 176 00:15:46,380 --> 00:15:49,260 entire buildings becoming into data centers. 177 00:15:49,420 --> 00:15:54,720 There are some examples of university campuses seeking to construct data centers nationwide, 178 00:15:54,720 --> 00:16:06,920 Staff includes an allowance for universities in medical facilities, subject to the institutional master plan requirements in Article 15 to seek data centers as a use allowance within their master planning process. 179 00:16:08,140 --> 00:16:12,840 Lastly, on-site power generation is prohibited except for backup purposes. 180 00:16:12,840 --> 00:16:16,800 So staff recommends approval of the proposed language. 181 00:16:17,180 --> 00:16:21,020 However, this morning, we realized a noticing issue, 182 00:16:21,260 --> 00:16:24,840 whereby the description of the zoning docket described the 183 00:16:25,400 --> 00:16:28,090 interim zoning district that was previously considered. 184 00:16:28,500 --> 00:16:31,260 Instead of this text amendment to create a definition 185 00:16:31,260 --> 00:16:32,480 around data centers. 186 00:16:32,720 --> 00:16:35,860 And because of this, I think we will recommend deferral. 187 00:16:38,000 --> 00:16:39,880 Can you repeat that last part again? 188 00:16:40,880 --> 00:16:41,200 Right. 189 00:16:41,200 --> 00:16:46,560 So, what we found this morning is that while the the zoning 190 00:16:46,560 --> 00:16:50,160 docked case number was listed on our public notice documents, the 191 00:16:50,160 --> 00:16:54,100 description actually referenced the interim zoning district that you 192 00:16:54,100 --> 00:16:57,440 all reviewed previously instead of this text amendment. 193 00:16:58,360 --> 00:17:01,480 And so for that purpose, I think we would recommend deferral. 194 00:17:03,820 --> 00:17:07,160 So, just to follow up on that, something we've done in the past when we've 195 00:17:07,160 --> 00:17:10,160 had a noticing issue and it's really kind of a felt since it's 196 00:17:11,260 --> 00:17:25,200 We want to make sure that there's no possibility that somebody is going to challenge an ultimate decision based on a procedural mistake. 197 00:17:25,200 --> 00:17:35,700 So again, I think what we are going to suggest in a lower commute is to refresh on the timing. 198 00:17:37,040 --> 00:17:39,100 We have to notice it three consecutive weeks. 199 00:17:39,280 --> 00:17:42,000 So we're not going to be able to make the August 11th meeting. 200 00:17:42,300 --> 00:17:42,800 Is that correct? 201 00:17:43,560 --> 00:17:44,320 Sabine, you. 202 00:17:46,920 --> 00:17:50,960 Yes, the notice for that meeting actually just went out at the end of last week. 203 00:17:51,420 --> 00:17:54,140 Right, so we would suggest the August 25th. 204 00:17:54,140 --> 00:17:58,840 I think it would be the earliest that we could defer it to. 205 00:17:59,840 --> 00:18:06,140 And do we hold up public hearing, so to speak, if there's anybody here, or do we defer it 206 00:18:07,520 --> 00:18:10,860 vote on a deferral before that? 207 00:18:11,880 --> 00:18:17,620 I mean, I'm comfortable with having, if people are here to testify to have them testify? 208 00:18:17,840 --> 00:18:19,760 Yeah, that's usually what we do with the deferral. 209 00:18:19,760 --> 00:18:26,320 Okay. And then when we hear it again, does the report get, we pick up where we left off, 210 00:18:26,400 --> 00:18:30,280 or do we read the staff report again and go through this whole process again? 211 00:18:32,540 --> 00:18:35,900 I think what we've done. We want to hear lower again. We've read it again. 212 00:18:38,760 --> 00:18:42,680 And there's just a handful of people here, so. 213 00:18:42,960 --> 00:18:45,980 We'll probably do it again. Okay. I mean, there will be more people in the audience. 214 00:18:48,200 --> 00:18:53,480 Is there anybody in the audience who wants to speak on this issue? 215 00:18:54,080 --> 00:18:54,120 Yeah. 216 00:18:55,640 --> 00:18:56,140 Great. 217 00:18:56,340 --> 00:18:56,680 Coming up. 218 00:18:56,820 --> 00:18:57,980 Did you fill out a card? 219 00:18:58,580 --> 00:18:58,980 Terrific. 220 00:18:59,740 --> 00:19:01,980 And then while we're getting your card. 221 00:19:02,480 --> 00:19:05,540 I have a card from Susan Johnson, but again, you don't want to speak. 222 00:19:06,820 --> 00:19:07,920 So we have one speaker. 223 00:19:09,620 --> 00:19:12,500 And that is Jesse George. 224 00:19:12,500 --> 00:19:14,180 Yes, and I'll be very brief. 225 00:19:14,320 --> 00:19:15,200 Thank you, Jesse Jordan. 226 00:19:15,340 --> 00:19:17,000 I have the Alliance for Affordable Energy. 227 00:19:17,400 --> 00:19:20,700 Just wanted to say thank you for to the commission staff 228 00:19:20,700 --> 00:19:22,300 for their work on these recommendations, 229 00:19:22,940 --> 00:19:25,020 also for including the recommendations 230 00:19:25,020 --> 00:19:28,400 that the Alliance provided in their report to the commission. 231 00:19:29,280 --> 00:19:32,280 And we are in full support of a prohibition 232 00:19:32,280 --> 00:19:34,700 on hyperscaled data centers in New Orleans. 233 00:19:35,560 --> 00:19:38,040 They represent a major threat to communities 234 00:19:38,040 --> 00:19:40,580 around the country and around the rest of this state. 235 00:19:40,580 --> 00:19:45,860 So this is an important step to protect the ratepayers and the citizens of New Orleans. Thank you 236 00:19:46,280 --> 00:19:53,760 And then Mr. George, I'm just going to your address is 4519 South Claybarn and you're with the Alliance for Affordable Energy. 237 00:19:54,040 --> 00:19:55,580 That's correct. Great. Thank you. 238 00:19:57,900 --> 00:20:04,200 If there's nobody else in the audience who wants to speak, we had a couple of comments from the commission. 239 00:20:04,200 --> 00:20:09,720 Commissioner, any mayor? Yes, thank you. On page 4 could you pull that up? 240 00:20:22,160 --> 00:20:31,820 It was a one with the map of the, you hear the red shading and like two different colors. 241 00:20:39,640 --> 00:20:45,960 Before that you had mentioned the three types of data centers that would be allowed. So that's the one. 242 00:20:45,960 --> 00:20:54,520 So the red, what type of data center, what that be in the zoning for those areas, is that 243 00:20:54,520 --> 00:21:04,020 industrial or the red area on this commercial center, it's the C1, C2, C3, and then some 244 00:21:04,020 --> 00:21:15,930 medical education areas, and that would allow conditionally small data centers and they would 245 00:21:15,930 --> 00:21:42,430 I'll be conditional use because I just want to I want to ask that question because a community is kind of confused, you know, with the term data center, you know, we have the different categories, so that needs to be actually explained, so they're the public one to stand, you know, what will be allowed if it's going to be allowed. Okay, okay. Thank you. 246 00:21:42,430 --> 00:21:51,190 I had a question. So hyper size is not allowed anywhere? 247 00:21:51,910 --> 00:21:58,290 Yes. Yes. It's prohibited. Larger hyper scale. So anything greater than 100,000 square feet 248 00:21:58,290 --> 00:22:04,690 for greater than 20 megawatts would be prohibited. And that's really based on our 249 00:22:04,690 --> 00:22:09,650 conversations with a lot of the different people that we spoke with, from a lot of different entities. 250 00:22:11,030 --> 00:22:18,010 20 megawatts is considered a pretty high power draw. 251 00:22:18,710 --> 00:22:23,590 As we understand, it's a very high industrial type of use. 252 00:22:24,610 --> 00:22:32,850 So beyond that is you're getting into a realm of something I think that didn't seem appropriate for us, 253 00:22:32,850 --> 00:22:34,670 even to conditionally, you consider. 254 00:22:35,410 --> 00:22:38,850 And I have one more question, but so hypersize 255 00:22:38,850 --> 00:22:42,750 brings to mind hyperdrive from Star Wars, which 256 00:22:42,750 --> 00:22:45,790 is an alternative dimension to cross the galaxy. 257 00:22:46,090 --> 00:22:48,110 It millions and times the speed of light. 258 00:22:48,210 --> 00:22:50,710 And we probably don't need that in order to perish. 259 00:22:52,190 --> 00:22:56,950 Why did you allow conditional uses in the CBD? 260 00:22:58,350 --> 00:23:07,250 You see, it just strikes me to be inappropriate to have a data center in the midst of, yeah. 261 00:23:08,290 --> 00:23:16,950 So, what we found is, you know, there are existing data centers in the CBD that are taking up small office spaces. 262 00:23:17,090 --> 00:23:22,270 We really tried to find out exactly how much office space they were taking up. 263 00:23:22,270 --> 00:23:31,870 We were unsuccessful in that endeavor, but we do know that there are data centers that exist downtown that offer different services to different types of clients 264 00:23:31,870 --> 00:23:35,550 Maybe they're hosting their data. They're 265 00:23:35,550 --> 00:23:37,550 Doing other things and 266 00:23:38,070 --> 00:23:43,390 We felt like that could be an appropriate use for some empty 267 00:23:43,390 --> 00:23:51,050 Office faces a minute to wait to use some office existing vacant office face and we talked with other 268 00:23:51,050 --> 00:23:57,790 use and saw use case examples where they did sort of entire building rehabs and they were putting 269 00:23:57,790 --> 00:24:01,630 data centers in and we didn't feel like that was necessarily appropriate for New Orleans, 270 00:24:02,010 --> 00:24:09,810 who really wanted to keep those office buildings as office buildings and to be utilized that way, 271 00:24:09,930 --> 00:24:14,090 but this seemed like potentially an appropriate sort of inter-emuse for vacant space. 272 00:24:14,090 --> 00:24:17,050 And so that's why I may be limited to one per building. 273 00:24:17,050 --> 00:24:19,910 That's why we said a limitation of one per building. 274 00:24:20,490 --> 00:24:23,730 So 20,000 square feet is roughly oftentimes 275 00:24:23,730 --> 00:24:26,490 like the square foot into the tire floor. 276 00:24:26,970 --> 00:24:29,330 So we found that to be sort of a high end. 277 00:24:29,790 --> 00:24:35,110 And then it was the sense that you would only have one per building. 278 00:24:36,030 --> 00:24:36,930 You would limit that. 279 00:24:37,090 --> 00:24:40,810 To add to that, there's one category, 280 00:24:41,250 --> 00:24:44,910 which is the CBG7 district, which is the biomedical district. 281 00:24:44,910 --> 00:24:56,850 So we just thought that a larger size may be more appropriate in that setting given types of uses that are likely to locate. 282 00:24:57,690 --> 00:25:07,530 And then the electric, I'm just envisioning that data center that sucks a lot of electricity and some big office building goes dark, which is, you know, admittedly. 283 00:25:08,270 --> 00:25:15,430 So that would be up that would be part of the energy review process before it's even submitted to CPC. 284 00:25:15,890 --> 00:25:23,670 So the idea and that's why we had that first use standard is that all these applications would sort of be pre-reviewed and pre-approved. 285 00:25:23,950 --> 00:25:32,390 And so energy would be able to say, yes, we can support this type of energy draw or this new facility. 286 00:25:32,390 --> 00:25:38,890 And so we would have proof of that throughout the conditional use process so that would come first. 287 00:25:40,030 --> 00:25:40,890 Any other? 288 00:25:41,230 --> 00:25:41,830 Oh, Mr. Potcha. 289 00:25:42,090 --> 00:25:42,830 I just have a comment. 290 00:25:43,050 --> 00:25:46,010 Thank you to you and the team that put together this report. 291 00:25:47,830 --> 00:25:50,250 You're tackling a very complex issue. 292 00:25:51,770 --> 00:25:57,330 And I'm happy to know that we're actually deferring this because I'd hope there'd be a lot more public participation 293 00:25:57,330 --> 00:26:05,910 in this particular bucket item, you've done a great job of thorough analysis of a very complex 294 00:26:05,910 --> 00:26:11,570 issue and presented it very plainly, clearly with rationale and justification that is 295 00:26:11,570 --> 00:26:17,130 very simple to comprehend. I'm saying that because for the record I encourage anyone who 296 00:26:17,130 --> 00:26:22,920 has an interest in this case to thoroughly read this report because it clearly defines what we're 297 00:26:22,920 --> 00:26:29,380 with and what we're not. And answers a lot of questions that were in my mind prior to being here 298 00:26:29,380 --> 00:26:37,000 today. So great job with this. This is the kind of work that I know is hard to tackle and you've 299 00:26:37,000 --> 00:26:42,460 set us up for success, the public, and the commission in terms of having an honest dialogue and debate 300 00:26:42,460 --> 00:26:48,600 debate about moving forward with this. I also know that this is an emerging industry. It existed 301 00:26:48,600 --> 00:26:53,300 on some micro-scopic level for a long time, which is what we identify here in the report. 302 00:26:53,960 --> 00:27:00,360 And you all have worked well with some comparable cities to learn from their mistakes and 303 00:27:00,360 --> 00:27:08,180 devise a set of recommendations that hopefully can be trailblazing as additional cities begin 304 00:27:08,180 --> 00:27:10,660 to develop their regulatory environment around this. 305 00:27:11,020 --> 00:27:12,900 So thank you for the work that you all put in this. 306 00:27:13,120 --> 00:27:16,760 And I again really encourage everyone to read this report very thoroughly. 307 00:27:17,700 --> 00:27:29,880 Yeah, and I echo that as you were speaking, it was easy to follow your rationale going from zoning district to use as it was clear that you thought about all that. 308 00:27:31,160 --> 00:27:32,480 Any other comments from the commission? 309 00:27:32,940 --> 00:27:36,060 And then we would need a motion to defer. 310 00:27:36,780 --> 00:27:42,020 I'd like to move to defer to the August 25th CPC meeting. 311 00:27:42,020 --> 00:27:43,320 We are second. 312 00:27:43,620 --> 00:27:44,040 A second. 313 00:27:44,340 --> 00:27:45,540 Commissioner A, Bayer's second. 314 00:27:46,420 --> 00:27:49,160 If there's no discussion, I'll call for the vote. 315 00:27:49,360 --> 00:27:49,820 All in favor. 316 00:27:51,480 --> 00:27:51,600 Aye. 317 00:27:51,800 --> 00:27:52,640 Five eyes. 318 00:27:53,100 --> 00:27:53,760 No nays. 319 00:27:54,580 --> 00:27:55,240 Motion passes. 320 00:27:55,820 --> 00:28:01,000 We'll be back on the 25th. 321 00:28:05,980 --> 00:28:08,420 And Mr. George, you're welcome to come back on the 25th. 322 00:28:08,680 --> 00:28:10,440 But if not, your comments are in the record. 323 00:28:13,160 --> 00:28:14,040 Subdivision ratification. 324 00:28:15,460 --> 00:28:17,360 Do we have any? 325 00:28:17,540 --> 00:28:18,100 Yes. 326 00:28:18,920 --> 00:28:19,640 It is in your package. 327 00:28:19,960 --> 00:28:20,780 It is up there. 328 00:28:20,780 --> 00:28:26,020 It is a list of minus of division that we are in the process of approving and misredeveling, 329 00:28:26,240 --> 00:28:32,480 or rectifying, or decision that those sub-division can be reviewed and approved at a misredevel. 330 00:28:34,360 --> 00:28:37,820 We get a motion to approve the sub-division ratification. 331 00:28:38,440 --> 00:28:38,780 So moved. 332 00:28:38,860 --> 00:28:39,560 Mr. Poche. 333 00:28:42,360 --> 00:28:42,880 A second. 334 00:28:42,880 --> 00:28:45,940 Commissioner A. Bear seconds. All in favor. 335 00:28:47,300 --> 00:28:47,400 I. 336 00:28:48,160 --> 00:28:49,060 Five eyes. 337 00:28:49,500 --> 00:28:50,660 Any nays. None. 338 00:28:51,200 --> 00:28:51,820 That passes. 339 00:28:53,160 --> 00:28:53,560 And. 340 00:28:53,980 --> 00:28:55,780 Do I need a motion for adjournment? Or. 341 00:28:56,040 --> 00:28:58,040 Can I just declare it adjourn? 342 00:28:58,080 --> 00:28:59,160 Always wondered about that. 343 00:28:59,260 --> 00:29:00,400 Can I get a motion for adjourn? 344 00:29:01,320 --> 00:29:01,420 Yeah. 345 00:29:01,560 --> 00:29:02,880 Hello to adjourn meeting. 346 00:29:03,680 --> 00:29:04,700 Mr. A. Bear. 347 00:29:05,320 --> 00:29:06,540 Mr. Jackson seconds. 348 00:29:07,120 --> 00:29:07,580 All in favor? 349 00:29:08,160 --> 00:29:08,660 Aye. 350 00:29:08,660 --> 00:29:09,320 Five eyes. 351 00:29:09,760 --> 00:29:11,020 Motion passes. 352 00:29:11,020 --> 00:29:11,960 being a judge.