1 00:01:47,427 --> 00:01:50,445 Chair Price: This commission is called to order at 630. 2 00:01:50,445 --> 00:01:53,445 Would you call the roll? 3 00:01:54,672 --> 00:01:56,672 [Reading names] 4 00:02:07,905 --> 00:02:13,905 Would you please join us for the Pledge of Allegiance? 5 00:02:14,711 --> 00:02:17,111 [Reciting Pledge of Allegiance] 6 00:02:38,865 --> 00:02:46,650 At this time we have no cards that are brought forward clerk? 7 00:02:46,810 --> 00:02:49,810 Nothing on the comment cards? 8 00:03:01,854 --> 00:03:03,385 >> No comments. 9 00:03:03,385 --> 00:03:05,785 Chair Price: Thank you. 10 00:03:09,465 --> 00:03:14,417 So at this time we will have comments from the public. 11 00:03:14,417 --> 00:03:16,321 I have two cards that are submitted. 12 00:03:16,321 --> 00:03:18,971 You have three minutes to respond. 13 00:03:18,971 --> 00:03:23,421 I will call you up to the podium Here. 14 00:03:23,421 --> 00:03:30,210 Kathy Ashford is the first one to come up and make 15 00:03:30,305 --> 00:03:32,305 a presentation. 16 00:03:41,371 --> 00:03:43,913 >> I just don't think it's a good idea to have a liquor store 17 00:03:43,913 --> 00:03:45,857 next to a senior building. 18 00:03:45,857 --> 00:03:52,457 I don't think that alcohol should be sold there and brought 19 00:03:53,361 --> 00:03:58,250 on the premises and it's going to attract all kind of people 20 00:03:58,250 --> 00:04:01,113 and it's just for the safety and well-being for seniors 21 00:04:01,113 --> 00:04:03,850 that are living there. 22 00:04:03,850 --> 00:04:05,850 That's my take. 23 00:04:08,505 --> 00:04:12,350 I hope I'm presenting this properly. 24 00:04:12,350 --> 00:04:17,135 Because there's a lot of homeless people coming around 25 00:04:17,135 --> 00:04:21,717 and sleeping around there and doing all kinds of weird things. 26 00:04:21,717 --> 00:04:27,717 So I think alcohol being sold would be a nuisance. 27 00:04:28,665 --> 00:04:30,665 Is that it? 28 00:04:33,385 --> 00:04:37,145 Chair Price: When we have this come up on the agenda later 29 00:04:37,145 --> 00:04:39,853 would you like to come up and make comments about this? 30 00:04:39,853 --> 00:04:45,993 We will be -- this is for stuff not on the agenda. 31 00:04:45,993 --> 00:04:48,185 There are no other public comments 32 00:04:48,185 --> 00:04:50,110 on items that are not on the agenda. 33 00:04:50,110 --> 00:04:54,811 We will now move to The consent calendar. 34 00:05:06,465 --> 00:05:13,665 I would someone like to make a motion on the consent calendar? 35 00:05:14,803 --> 00:05:20,803 >> I will make a motion to approve the consent calendar. 36 00:05:26,460 --> 00:05:30,660 Chair Price: Please take the roll clerk. 37 00:05:31,107 --> 00:05:33,107 [Reading names] 38 00:05:48,225 --> 00:05:50,615 We now move to public hearings. 39 00:05:50,615 --> 00:05:55,415 The first one is on the library center. 40 00:06:06,944 --> 00:06:11,144 >> I think they're loading up the Powerpoint. 41 00:06:14,865 --> 00:06:16,369 Thank you. 42 00:06:16,369 --> 00:06:19,369 Good evening chair and commissioners. 43 00:06:19,889 --> 00:06:23,585 Next on the agenda is a design review 44 00:06:23,585 --> 00:06:28,985 for the proposed community center located at Main Street. 45 00:06:29,785 --> 00:06:33,250 Before I begin I just wanted to say how excited I 46 00:06:33,250 --> 00:06:38,171 am to present this project to you all not just on my behalf 47 00:06:38,171 --> 00:06:41,345 but on behalf of all the staff, the leadership 48 00:06:41,345 --> 00:06:45,345 team friends of the Oakley Library City Council past 49 00:06:45,345 --> 00:06:50,745 and present and residents who all envisioned this library 50 00:06:51,905 --> 00:06:55,425 and have taken part in the various steps along the way. 51 00:06:55,425 --> 00:06:57,513 As you know this is one of the biggest projects 52 00:06:57,513 --> 00:07:01,865 the city has taken part in in quite a long time. 53 00:07:01,865 --> 00:07:04,905 And we are all just excited about it. 54 00:07:04,905 --> 00:07:10,905 But with that being said I will start my Powerpoint. 55 00:07:12,825 --> 00:07:15,225 If the control works. 56 00:07:23,625 --> 00:07:25,625 Next slide please. 57 00:07:26,345 --> 00:07:32,331 So as you know the project site is here at our Civic Center 58 00:07:32,331 --> 00:07:34,525 site on Main Street. 59 00:07:34,525 --> 00:07:36,525 Next slide please. 60 00:07:36,758 --> 00:07:40,358 Surrounding uses include single family residences 61 00:07:41,217 --> 00:07:44,705 to the east and south and city Hall 62 00:07:44,705 --> 00:07:47,825 to the west and commercial shopping 63 00:07:47,825 --> 00:07:49,705 to the north of Main Street. 64 00:07:49,705 --> 00:07:54,505 This application is requesting approval of a variance 65 00:07:54,545 --> 00:07:58,238 for the proposed library and community center. 66 00:07:58,238 --> 00:08:03,273 Originally the proposed library was going to be a new single 67 00:08:03,273 --> 00:08:05,273 story approximately 13,000ft². 68 00:08:06,771 --> 00:08:10,550 And this library was meant to replace the existing 69 00:08:10,550 --> 00:08:14,505 library that shares a space with the library at Freedom High 70 00:08:14,505 --> 00:08:15,315 School. 71 00:08:15,315 --> 00:08:19,673 Some updated plans after publication of the notice 72 00:08:19,673 --> 00:08:22,701 of public hearing the project team in conjunction with city 73 00:08:22,701 --> 00:08:25,925 management agreed on a minor modification on square footage 74 00:08:25,925 --> 00:08:29,225 that reduced overall square footage of the project by adding 75 00:08:29,225 --> 00:08:32,915 approximately 500ft² of interior space and reducing the covered 76 00:08:32,915 --> 00:08:34,345 exterior space. 77 00:08:34,345 --> 00:08:37,185 The changes to the square footage of the library 78 00:08:37,185 --> 00:08:40,535 and community center would result in approximately 13,030 79 00:08:40,535 --> 00:08:44,735 square foot building which approximately is 12,000ft² 80 00:08:44,985 --> 00:08:46,985 for the building. 81 00:08:47,225 --> 00:08:50,825 A little over 1000ft² exterior space. 82 00:08:53,195 --> 00:08:56,795 The overall building design and layout 83 00:08:57,125 --> 00:09:03,125 does remain unchanged for Mac existing conditions at the site 84 00:09:03,930 --> 00:09:07,405 here as you see is relatively flat. 85 00:09:07,405 --> 00:09:11,929 There's a zone on the vacant parcel south heading up 86 00:09:11,929 --> 00:09:16,918 towards the property lines south to the residential properties. 87 00:09:16,918 --> 00:09:20,185 The site is developed with city park 88 00:09:20,185 --> 00:09:23,691 and associated improvements including the amphitheater stage 89 00:09:23,691 --> 00:09:26,561 area bathroom and parking and roadways. 90 00:09:26,561 --> 00:09:31,361 The site south to City Park is currently 91 00:09:31,785 --> 00:09:36,545 utilized as a staging area for city vehicles, vehicle parking 92 00:09:36,545 --> 00:09:43,145 for other equipment that we have and storage of other equipment. 93 00:09:43,345 --> 00:09:47,985 A little background as previously mentioned the Oakley 94 00:09:47,985 --> 00:09:53,329 Library shares approximately 3000ft² of space within the high 95 00:09:53,329 --> 00:09:56,449 school library and was originally intended 96 00:09:56,449 --> 00:09:58,849 as a temporary facility. 97 00:09:59,750 --> 00:10:02,145 The proposed facility is intended 98 00:10:02,145 --> 00:10:06,105 to serve as the new permanent library and community resource 99 00:10:06,105 --> 00:10:08,505 building for Oakley residents. 100 00:10:08,625 --> 00:10:12,297 This project will bring a highly anticipated building library 101 00:10:12,297 --> 00:10:15,633 to the heart of downtown Oakley. 102 00:10:15,633 --> 00:10:19,785 I won't go through the entire background 103 00:10:19,785 --> 00:10:23,230 as I previously mentioned since we became 104 00:10:23,230 --> 00:10:25,625 a city I think we have envisioned 105 00:10:25,625 --> 00:10:29,845 having our own library but most recently in 2023 efforts 106 00:10:29,845 --> 00:10:35,245 to have that library built and brought forth began. 107 00:10:36,345 --> 00:10:41,145 Many of the dates show meetings that staff 108 00:10:41,241 --> 00:10:45,438 has had with City Council common design 109 00:10:45,438 --> 00:10:50,838 and envisioning meetings with the public and other meetings 110 00:10:51,850 --> 00:10:54,585 to discuss financing and things of that sort. 111 00:10:54,585 --> 00:10:56,985 That ramped up in 2023. 112 00:10:59,305 --> 00:11:03,231 So what we have before you is we have a design review 113 00:11:03,231 --> 00:11:05,305 for the proposed library and community center 114 00:11:05,305 --> 00:11:10,305 which includes evaluation of the site parking and circulation 115 00:11:10,305 --> 00:11:14,505 landscaping and architectural design of the building 116 00:11:14,609 --> 00:11:18,495 itself an overall consistency with the downtown zoning 117 00:11:18,495 --> 00:11:19,585 standards. 118 00:11:19,585 --> 00:11:23,425 We also have a variance request for setback variances 119 00:11:23,425 --> 00:11:25,257 within the downtown core district 120 00:11:25,257 --> 00:11:28,250 which will help a better integrate 121 00:11:28,250 --> 00:11:33,425 the library with the surrounding facilities and public spaces. 122 00:11:33,505 --> 00:11:36,969 As I mentioned the design review which 123 00:11:36,969 --> 00:11:41,169 is required for new above ground buildings 124 00:11:41,409 --> 00:11:45,393 we have before you the design review 125 00:11:45,393 --> 00:11:49,495 helps the city ensure compliance with applicable standards 126 00:11:49,495 --> 00:11:52,865 established by the city's zoning ordinance. 127 00:11:52,865 --> 00:11:56,350 Through that design review we review 128 00:11:56,350 --> 00:11:58,865 consistency with our parking standards 129 00:11:58,865 --> 00:12:04,265 and landscaping and things of that sort as well. 130 00:12:05,505 --> 00:12:10,905 Here we have the proposed parking and landscaping layout. 131 00:12:11,825 --> 00:12:17,225 The parking layout is envisioned for the southern side 132 00:12:19,241 --> 00:12:22,505 of the building which will also tuck it in and bring 133 00:12:22,505 --> 00:12:25,811 the building forward in front of you. 134 00:12:25,811 --> 00:12:29,411 45 spaces are proposed including Ada spaces. 135 00:12:31,409 --> 00:12:35,825 The site also has a variety of landscaping 136 00:12:35,825 --> 00:12:38,825 proposed which includes about 19 trees 137 00:12:39,158 --> 00:12:43,473 a mix of shrubs ground covers and other plantings. 138 00:12:43,473 --> 00:12:48,801 With those 19 trees we also achieve about a 50% shade 139 00:12:48,801 --> 00:12:51,801 coverage for the parking area. 140 00:12:56,985 --> 00:13:00,835 Here we see a rendering of what the building would potentially 141 00:13:00,835 --> 00:13:02,135 look like. 142 00:13:02,135 --> 00:13:05,625 The building is oriented with the primary entrance 143 00:13:05,625 --> 00:13:09,145 and Le frontage facing the Civic Center park 144 00:13:09,145 --> 00:13:11,433 area with Main Street beyond. 145 00:13:11,433 --> 00:13:14,995 The facility is designed as a functional community 146 00:13:14,995 --> 00:13:18,850 hub intended to replace the existing Oakley Library. 147 00:13:18,850 --> 00:13:20,505 New orientation of the building also 148 00:13:20,505 --> 00:13:26,505 helps it be visually prominent and welcoming to the public. 149 00:13:26,505 --> 00:13:30,705 The design incorporates articulated roof forms covered 150 00:13:31,385 --> 00:13:34,255 exterior areas and extensive glazing 151 00:13:34,255 --> 00:13:37,355 to support interest natural daylight and a connection 152 00:13:37,355 --> 00:13:40,355 between indoor and outdoor spaces. 153 00:13:40,491 --> 00:13:44,345 Exterior materials include metal siding metal roofing 154 00:13:44,345 --> 00:13:48,665 and aluminum frame doors and windows and storefront systems. 155 00:13:48,665 --> 00:13:51,278 Wood board is incorporated into the design 156 00:13:51,278 --> 00:13:53,451 to provide a break in materials. 157 00:13:53,451 --> 00:13:56,525 The building's architectural design and material palette 158 00:13:56,525 --> 00:13:59,145 are carefully selected to ensure long term 159 00:13:59,145 --> 00:14:03,105 durability easy maintenance and civic esthetic that 160 00:14:03,105 --> 00:14:05,505 reflects the Oakley community. 161 00:14:06,865 --> 00:14:10,249 This is an example of the metal siding proposed 162 00:14:10,249 --> 00:14:12,769 for the building and different lighting 163 00:14:12,769 --> 00:14:15,813 to provide how it would look at different times of the day 164 00:14:15,813 --> 00:14:18,213 or in the shade. 165 00:14:19,425 --> 00:14:23,285 As I previously mentioned we also have the variance request. 166 00:14:23,285 --> 00:14:25,485 The applicant is seeking variances 167 00:14:25,485 --> 00:14:28,105 for the front setback facing east 168 00:14:28,105 --> 00:14:30,265 towards the north cross lane. 169 00:14:30,265 --> 00:14:36,865 The side setbacks and city park and south towards the existing 170 00:14:37,185 --> 00:14:39,457 residential properties and then the rear setback 171 00:14:39,457 --> 00:14:42,651 to the west towards City Hall in order 172 00:14:42,651 --> 00:14:46,976 to allow for the proposed library to exceed the setback 173 00:14:46,976 --> 00:14:51,329 maximums in the Downtown Specific plan in order to create 174 00:14:51,329 --> 00:14:54,405 and enhanced library siting that allows minimal disruption 175 00:14:54,405 --> 00:14:56,805 to the existing facilities. 176 00:14:56,805 --> 00:14:59,995 To grant variance the Planning Commission 177 00:14:59,995 --> 00:15:02,385 must make three findings for approval which 178 00:15:02,385 --> 00:15:05,385 are outlined in the resolution. 179 00:15:06,225 --> 00:15:11,250 The project is exempt from environmental Quality Act 180 00:15:12,665 --> 00:15:16,265 pursuant to guideline section 15 in developments. 181 00:15:18,249 --> 00:15:22,873 As I previously mentioned draft findings for the designer 182 00:15:22,873 --> 00:15:24,675 and variance application can be found 183 00:15:24,675 --> 00:15:26,105 in the proposed resolution. 184 00:15:26,105 --> 00:15:29,651 As such staff recommends the Planning Commission 185 00:15:29,651 --> 00:15:34,451 approved the proposed resolution and variance as conditioned. 186 00:15:36,465 --> 00:15:39,889 I would also like to mention that the applicant team 187 00:15:39,889 --> 00:15:44,640 or design team is here with a brief presentation that 188 00:15:44,640 --> 00:15:46,665 will show some great pictures as well. 189 00:15:46,665 --> 00:15:48,665 Thank you. 190 00:15:52,619 --> 00:15:56,819 Chair Price: Any questions from the Commission? 191 00:16:00,603 --> 00:16:02,645 Commissioner Oliveros: I do have a quick question 192 00:16:02,645 --> 00:16:04,415 for the applicant if possible. 193 00:16:04,415 --> 00:16:06,815 The design is great. 194 00:16:07,405 --> 00:16:10,465 >> We will let them do the presentation. 195 00:16:10,465 --> 00:16:13,881 Commissioner Oliveros: I got ahead of myself. 196 00:16:13,881 --> 00:16:15,881 I'm too excited. 197 00:16:18,432 --> 00:16:20,265 >> Thank you very much for this opportunity. 198 00:16:20,265 --> 00:16:24,649 My name is Susie here with the project Architect 199 00:16:24,649 --> 00:16:26,691 and together we will walk you through some 200 00:16:26,691 --> 00:16:31,136 of the backstory on the design and how we got to this place 201 00:16:31,136 --> 00:16:32,865 in our design. 202 00:16:32,865 --> 00:16:35,865 This is always the test. 203 00:16:36,155 --> 00:16:37,785 Look at that. 204 00:16:37,785 --> 00:16:44,985 So part of our process is this gamma to listen and observe 205 00:16:45,625 --> 00:16:48,545 and then to design and we've had a great opportunity 206 00:16:48,545 --> 00:16:52,745 to do that with your community here. 207 00:16:52,825 --> 00:16:57,250 Our process so far has been organized 208 00:16:57,233 --> 00:17:03,250 into three phases so far gamma a validation phase which 209 00:17:03,250 --> 00:17:06,436 was programing, a concept design phase which was the concept 210 00:17:06,436 --> 00:17:08,485 and now we are in design development 211 00:17:08,485 --> 00:17:11,545 and that's the point at which we submit for the planning 212 00:17:11,545 --> 00:17:13,545 department preview. 213 00:17:14,425 --> 00:17:20,425 As a foundational step we began with the spatial programing that 214 00:17:20,425 --> 00:17:24,380 includes this great number of meetings you see there, 215 00:17:24,380 --> 00:17:28,438 many of them with the library and with city staff, 216 00:17:28,438 --> 00:17:31,438 15 informational interviews where we talk 217 00:17:31,491 --> 00:17:33,885 to 26 people in the community. 218 00:17:33,885 --> 00:17:37,820 The concept design included all of those meetings there 219 00:17:37,820 --> 00:17:40,145 plus three community engagement sessions 220 00:17:40,145 --> 00:17:43,265 which were wonderful opportunities for us to hear 221 00:17:43,265 --> 00:17:45,537 directly from folks also. 222 00:17:45,537 --> 00:17:49,513 And then finally the design development we have done 223 00:17:49,513 --> 00:17:52,951 a number of meetings with the library and with the city staff 224 00:17:52,951 --> 00:17:58,649 and with our core team and the subsets of that including Parks 225 00:17:58,649 --> 00:18:01,299 and Rec, the IT folks, etc.. 226 00:18:01,299 --> 00:18:04,280 So it's been a pretty inclusive process 227 00:18:04,280 --> 00:18:08,345 and it is based on that that we have developed this design 228 00:18:08,345 --> 00:18:10,745 starting with project goals. 229 00:18:11,305 --> 00:18:13,577 Fundamental project goal for this project 230 00:18:13,577 --> 00:18:16,619 that we heard from the community as well as many of you 231 00:18:16,619 --> 00:18:19,921 here in this room is that the library and community center 232 00:18:19,921 --> 00:18:23,689 should be a welcoming hub where residents of all ages 233 00:18:23,689 --> 00:18:25,475 and backgrounds can come together 234 00:18:25,475 --> 00:18:27,875 for enrichment and connection. 235 00:18:28,250 --> 00:18:31,171 This is a place that will serve as a centerpiece 236 00:18:31,171 --> 00:18:34,265 of your downtown Civic Center and it's 237 00:18:34,265 --> 00:18:37,265 designed to embody Oakley's family 238 00:18:37,758 --> 00:18:41,358 friendly and characteristic supporting collaborative feeling 239 00:18:42,305 --> 00:18:47,209 that you get when you visit and you are in this town. 240 00:18:47,209 --> 00:18:49,485 And supporting collaboration come 241 00:18:49,485 --> 00:18:52,345 a lifelong learning and smart development 242 00:18:52,345 --> 00:18:55,945 has been incorporated into our thinking 243 00:18:56,305 --> 00:18:59,305 complete with indoor outdoor connections? 244 00:18:59,371 --> 00:19:01,771 Cost efficient spatial organization, 245 00:19:04,225 --> 00:19:06,625 cost efficient construction methodology. 246 00:19:07,401 --> 00:19:11,905 Cost has been at the core of every decision we've made 247 00:19:11,905 --> 00:19:15,185 and all of this plus sustainability integrated 248 00:19:15,185 --> 00:19:20,585 into a design that's meant to capture the essence. 249 00:19:24,385 --> 00:19:26,801 With these goals as our foundation 250 00:19:26,801 --> 00:19:30,745 we then went into programing sessions with the city 251 00:19:30,745 --> 00:19:31,765 and library staff. 252 00:19:31,765 --> 00:19:34,749 We came to a 1200 zero square foot library 253 00:19:34,749 --> 00:19:38,729 over half of that is attributed to the library itself 254 00:19:38,729 --> 00:19:41,897 and the support spaces and the remainder 255 00:19:41,897 --> 00:19:45,885 is for shared community spaces like the large community room 256 00:19:45,885 --> 00:19:49,365 and dedicated city spaces also within the plan. 257 00:19:49,365 --> 00:19:56,291 So you can see those spaces that are to scale on the left 258 00:19:56,291 --> 00:19:58,545 and the spatial adjacency is what 259 00:19:58,545 --> 00:20:02,725 should be next to what is in the diagram on the right. 260 00:20:02,725 --> 00:20:06,250 We also had the opportunity to spend some time 261 00:20:06,250 --> 00:20:11,398 on your site looking and the park is obviously 262 00:20:11,398 --> 00:20:15,505 a huge asset to your community life and the city 263 00:20:15,505 --> 00:20:18,481 and it's already a great local public gathering 264 00:20:18,481 --> 00:20:21,780 space in its own right. 265 00:20:21,780 --> 00:20:25,278 We spent some time researching and taking consideration 266 00:20:25,278 --> 00:20:27,678 of the environmental factors. 267 00:20:27,758 --> 00:20:29,860 We learned things that you already 268 00:20:29,860 --> 00:20:33,271 know like it's hot in the summer here. 269 00:20:33,271 --> 00:20:37,645 Not so much in the Bay area we will say and it is foggy 270 00:20:37,645 --> 00:20:40,625 and chilly in the winter and this site 271 00:20:40,625 --> 00:20:43,451 offers this excellent orientation opportunity 272 00:20:43,451 --> 00:20:48,505 for north facing natural Daylit library spaces and community 273 00:20:48,505 --> 00:20:53,305 spaces and a south facing move for mounting 274 00:20:55,321 --> 00:20:57,321 arrays for electricity. 275 00:20:57,625 --> 00:21:02,405 We also map the site's critical landscape elements. 276 00:21:02,405 --> 00:21:07,145 You have some tremendous trees come on that beautiful oak 277 00:21:07,145 --> 00:21:11,905 heritage tree there on the Western side of the site come 278 00:21:11,905 --> 00:21:14,985 a vehicular and pedestrian circulation patterns 279 00:21:14,985 --> 00:21:18,849 and these outlook opportunities from the library site itself 280 00:21:18,849 --> 00:21:21,715 all of which complement and work well together 281 00:21:21,715 --> 00:21:26,515 except for your existing bandshell and restroom building 282 00:21:27,561 --> 00:21:30,585 and we were delighted when we were given the green light 283 00:21:30,585 --> 00:21:35,350 by city staff and council to remove and replace those two 284 00:21:35,350 --> 00:21:38,820 components as part of this project which we think 285 00:21:38,820 --> 00:21:41,725 is great news for the project and for the park. 286 00:21:41,725 --> 00:21:45,350 In our analysis we also recognize the importance 287 00:21:45,350 --> 00:21:47,165 of that pedestrian connector that 288 00:21:47,165 --> 00:21:51,705 goes from City Hall and then the paths that 289 00:21:51,705 --> 00:21:56,505 go through the park towards the City Hall or Main Street 290 00:21:56,505 --> 00:21:58,545 all of which are very important. 291 00:21:58,545 --> 00:22:02,745 With input from the city staff we 292 00:22:02,937 --> 00:22:08,545 are proposing that the vehicular traffic be one way moving 293 00:22:08,545 --> 00:22:14,921 east to west to kind of cut off the tendency for people 294 00:22:14,921 --> 00:22:19,725 to use the shortcut through that parking lot that would be south 295 00:22:19,725 --> 00:22:23,250 of the library site making it more pedestrian 296 00:22:23,250 --> 00:22:25,250 friendly and safer. 297 00:22:26,545 --> 00:22:30,449 And we spent some time on your delta really 298 00:22:30,449 --> 00:22:33,925 taking that in and understanding what that's about 299 00:22:33,925 --> 00:22:36,340 and what that feels like as a way 300 00:22:36,340 --> 00:22:38,515 to figure out how we might incorporate 301 00:22:38,515 --> 00:22:42,145 the feeling of the delta into this library design which 302 00:22:42,145 --> 00:22:43,985 takes us to design. 303 00:22:43,985 --> 00:22:47,865 This is a plan you have seen and you're probably 304 00:22:47,865 --> 00:22:51,641 familiar with now as mentioned the design approach is 305 00:22:51,641 --> 00:22:57,185 to place that new building tight towards that central walkway 306 00:22:57,185 --> 00:23:02,558 as we've been calling it and with a grand porch 307 00:23:02,558 --> 00:23:06,405 that looks out towards the central pavilion which 308 00:23:06,405 --> 00:23:11,920 now sweeps across this design instead of being a three 309 00:23:11,920 --> 00:23:15,457 quarter or two thirds it is now a full half circle 310 00:23:15,457 --> 00:23:19,465 that sweeps across the northern side of the park opening 311 00:23:19,465 --> 00:23:23,145 that up for your wonderful special Friday 312 00:23:23,145 --> 00:23:26,369 night and weekend events you have on this site. 313 00:23:26,369 --> 00:23:31,805 In the building itself gamma the shared spaces for the city 314 00:23:31,805 --> 00:23:34,173 and city spaces are on the left in blue 315 00:23:34,173 --> 00:23:39,585 and the library public spaces are in orange with the library 316 00:23:39,585 --> 00:23:42,469 operations in that pink band that's on the bottom 317 00:23:42,469 --> 00:23:48,469 and you can see the parking lot in that plan. 318 00:23:48,945 --> 00:23:54,305 So the approach we adopted for bringing the delta in 319 00:23:54,305 --> 00:23:56,985 was the sense you get when you're on the delta 320 00:23:56,985 --> 00:23:59,890 there's the open water and then there's 321 00:23:59,890 --> 00:24:03,650 that wonderful magical transition between the Delta's 322 00:24:03,650 --> 00:24:05,465 edge and solid ground. 323 00:24:05,657 --> 00:24:10,457 We brought that thinking into the site plan. 324 00:24:15,585 --> 00:24:19,185 Our approach here is the amphitheater 325 00:24:20,105 --> 00:24:23,225 if you will is open water and that 326 00:24:23,225 --> 00:24:26,851 transitions through this rich variety of spaces which 327 00:24:26,851 --> 00:24:31,510 is the pavilion gamma Delta inspired landscaping 328 00:24:31,500 --> 00:24:34,875 that big grand front porch and into the reading 329 00:24:34,875 --> 00:24:37,865 room with these glorious north facing windows 330 00:24:37,865 --> 00:24:40,105 and there's that south facing roof 331 00:24:40,105 --> 00:24:43,285 that you can now generate electricity 332 00:24:43,285 --> 00:24:46,285 for this all electric project. 333 00:24:48,385 --> 00:24:53,185 And here is the rendering you've seen before. 334 00:24:54,195 --> 00:24:59,745 The library is on the left side and the community room 335 00:24:59,745 --> 00:25:03,511 is on the left side and the pavilion is right in the middle 336 00:25:03,511 --> 00:25:07,449 and behind that is the main porch and the entry 337 00:25:07,449 --> 00:25:13,905 into the library, one of the two entries into the library. 338 00:25:13,905 --> 00:25:17,505 And here is the site plan. 339 00:25:18,570 --> 00:25:20,265 Chris will talk about the floor plan here in a minute 340 00:25:20,265 --> 00:25:23,891 but you can see there's the reconfigured amphitheater, 341 00:25:23,891 --> 00:25:28,305 the pavilion right there pushing out into the amphitheater 342 00:25:28,305 --> 00:25:33,145 zone, the rich landscaping on either side of the walkway that 343 00:25:33,145 --> 00:25:40,445 takes you to the porch and takes you into the lobby and community 344 00:25:40,445 --> 00:25:42,445 center rooms. 345 00:25:42,545 --> 00:25:49,145 With that I will let Chris walk us through the plan. 346 00:26:00,500 --> 00:26:02,300 >> I know we are limited at times so I will cover this 347 00:26:02,300 --> 00:26:04,245 at a bit of a high level. 348 00:26:04,245 --> 00:26:06,669 We have our shared entry hall in yellow 349 00:26:06,669 --> 00:26:09,905 which allows access for the building from both park 350 00:26:09,905 --> 00:26:13,785 side to the north and also the parking lot side to the south 351 00:26:13,785 --> 00:26:15,505 which puts you in that same central hall 352 00:26:15,505 --> 00:26:18,250 and then everything is accessed off of that. 353 00:26:18,250 --> 00:26:21,369 As you mentioned you have the library programing 354 00:26:21,369 --> 00:26:24,265 on the right which is in red. 355 00:26:24,265 --> 00:26:28,425 Specifically located the adults teens and children's area 356 00:26:28,425 --> 00:26:31,410 against that northern side which is 357 00:26:31,410 --> 00:26:34,310 right against the large windows that face the park's 358 00:26:34,310 --> 00:26:38,105 so you can see what else the community is doing 359 00:26:38,105 --> 00:26:43,650 and also get views of the great greenery and surrounds. 360 00:26:43,650 --> 00:26:45,305 Similarly on the left hand side of the plan 361 00:26:45,305 --> 00:26:50,650 we have community spaces in city spaces and the main program 362 00:26:50,650 --> 00:26:52,497 being that community room that similarly 363 00:26:52,497 --> 00:26:57,476 is right against the north side double doors that open out 364 00:26:57,476 --> 00:27:01,845 to the patio so it kind of enhances this connection as 365 00:27:01,845 --> 00:27:03,100 much as possible. 366 00:27:03,100 --> 00:27:07,799 I just want to bring up a few changes 367 00:27:07,799 --> 00:27:10,409 we made since the community outreach sessions. 368 00:27:10,409 --> 00:27:13,633 We heard a few different things which we have tried 369 00:27:13,633 --> 00:27:15,105 to incorporate into the plan. 370 00:27:15,105 --> 00:27:19,265 One was is there any way we can make the library any bigger 371 00:27:19,265 --> 00:27:23,535 given the limited scope and budget and we were able to push 372 00:27:23,535 --> 00:27:30,735 the glass wall just about eight feet which got us that 500ft² 373 00:27:30,951 --> 00:27:34,710 behind us and the library is super excited about that and we 374 00:27:34,710 --> 00:27:37,170 are excited to just give that little bit of generosity 375 00:27:37,170 --> 00:27:37,953 into the plan. 376 00:27:37,953 --> 00:27:45,153 We also heard a lot of feedback about making that area bigger. 377 00:27:46,345 --> 00:27:49,336 So we have reworked the Bookstacks a little bit 378 00:27:49,336 --> 00:27:51,478 to provide more seating for the teens 379 00:27:51,478 --> 00:27:54,525 and also provide some seating with the stacks 380 00:27:54,525 --> 00:27:59,925 next to it that can serve as a overflow. 381 00:28:00,225 --> 00:28:04,537 In the children's area we heard a bit about wanting sensory play 382 00:28:04,537 --> 00:28:08,737 and rotary has donated panels that we 383 00:28:08,875 --> 00:28:11,875 will go into that section. 384 00:28:11,989 --> 00:28:15,355 And then lastly we heard comments about the exterior 385 00:28:15,355 --> 00:28:17,725 bathrooms where those are best located 386 00:28:17,725 --> 00:28:21,278 and we have moved those to the southeast corner of the building 387 00:28:21,278 --> 00:28:25,529 with a path directly to the playground area which 388 00:28:25,529 --> 00:28:29,129 was a big concern for parents. 389 00:28:30,145 --> 00:28:35,156 Here is just a taste of -- these aren't fully developed but gives 390 00:28:35,156 --> 00:28:39,225 you an idea of the spaces in the community room. 391 00:28:39,225 --> 00:28:40,835 It will have an exposed wood structure 392 00:28:40,835 --> 00:28:43,650 to provide warmth inside alongside a wood 393 00:28:43,650 --> 00:28:46,665 ceiling and those full height windows 394 00:28:47,650 --> 00:28:52,825 on two sides of the community room to the greenery beyond. 395 00:28:52,825 --> 00:28:58,225 This is looking from the adult section, the adult seating 396 00:28:58,225 --> 00:29:01,438 area along the glass wall and then the covered porch 397 00:29:01,438 --> 00:29:05,625 as well both defined by a slightly lower roof that 398 00:29:05,625 --> 00:29:11,625 is a more human scale next to the grander scale. 399 00:29:14,125 --> 00:29:20,905 And then the kids area similarly is against that large glass wall 400 00:29:20,905 --> 00:29:24,995 so you can get a good sense of daylight and view to the outside 401 00:29:24,995 --> 00:29:27,995 then there's the sensory panels. 402 00:29:29,765 --> 00:29:33,965 For exterior materials durability and low maintenance 403 00:29:38,545 --> 00:29:43,945 and affordability we're kind of the main drivers here 404 00:29:43,985 --> 00:29:49,385 so we're choosing a metal siding that does that. 405 00:29:51,105 --> 00:29:54,705 A big generous roof that provides 406 00:29:55,250 --> 00:29:59,225 shade and then again indoor outdoor connection. 407 00:30:00,435 --> 00:30:04,890 We talked about this a little bit. 408 00:30:04,890 --> 00:30:08,985 This is just another photo of the exterior materials 409 00:30:08,985 --> 00:30:10,945 we are proposing. 410 00:30:10,945 --> 00:30:12,525 It's a pretty neutral palette that 411 00:30:12,525 --> 00:30:15,465 allows plants surrounding it to really take the forefront 412 00:30:15,465 --> 00:30:19,337 and have their shadows get cast against this more 413 00:30:19,337 --> 00:30:20,121 neutral palette. 414 00:30:20,121 --> 00:30:23,170 In the middle siding there is the main siding 415 00:30:23,170 --> 00:30:26,205 that goes towards the park and has a slight pattern that 416 00:30:26,205 --> 00:30:28,577 captures the light and also reflects 417 00:30:28,577 --> 00:30:32,935 a little bit of the surrounding nature similar to the water 418 00:30:32,935 --> 00:30:38,935 in the Delta which is kind of a reflection back. 419 00:30:40,465 --> 00:30:45,700 So here is what we are calling the Paseo which 420 00:30:45,700 --> 00:30:48,151 is a path from North Cross to City Hall. 421 00:30:48,151 --> 00:30:49,817 You can see the dome in the background. 422 00:30:49,817 --> 00:30:54,145 You can see the rich variety of small intimate seating 423 00:30:54,145 --> 00:30:59,324 areas and larger seating areas beyond the plant palette that 424 00:30:59,324 --> 00:31:04,208 references the Delta, reedy plants and grasses and then 425 00:31:04,208 --> 00:31:06,864 trees and large overhangs for shade. 426 00:31:06,864 --> 00:31:11,284 This is an image of the new pavilion which 427 00:31:11,284 --> 00:31:15,665 serves the functions you guys had before for performances 428 00:31:15,665 --> 00:31:20,585 and movies, concerts but it also adds this other level 429 00:31:20,585 --> 00:31:24,761 of programing where it can be for picnics or small gatherings. 430 00:31:24,761 --> 00:31:28,111 An event on Saturday so it opens up 431 00:31:28,111 --> 00:31:31,111 new possibilities for the park. 432 00:31:31,185 --> 00:31:36,465 And finally just an overview aerial of the park 433 00:31:36,465 --> 00:31:38,491 with the new library. 434 00:31:38,491 --> 00:31:45,910 So thank you all and I'm ready to take any questions. 435 00:31:49,542 --> 00:31:51,345 >> Thank you. 436 00:31:51,345 --> 00:31:54,345 >> Any questions for the applicant? 437 00:31:57,822 --> 00:32:00,405 Commissioner Oliveros: First and foremost thank you very much. 438 00:32:00,405 --> 00:32:02,530 I am very excited about this and I 439 00:32:02,530 --> 00:32:04,375 did attend one of the planning sessions 440 00:32:04,375 --> 00:32:07,705 so as I was hearing your feedback I said good 441 00:32:07,705 --> 00:32:09,170 that they are adding this. 442 00:32:09,170 --> 00:32:12,585 I think what makes anything successful is that you get input 443 00:32:12,585 --> 00:32:15,713 from the community to make sure that it benefits it. 444 00:32:15,713 --> 00:32:19,185 And also that it's aligned with our mission and vision which 445 00:32:19,185 --> 00:32:20,825 it truly is. 446 00:32:20,825 --> 00:32:24,189 One question I did have on the design 447 00:32:24,189 --> 00:32:29,500 were two questions I know this is just a sample 448 00:32:29,500 --> 00:32:31,345 but just to confirm this park will 449 00:32:31,345 --> 00:32:34,345 be staying the same correct? 450 00:32:41,702 --> 00:32:42,535 >> I'll answer that. 451 00:32:42,535 --> 00:32:46,735 So you're talking about the playground portion? 452 00:32:49,303 --> 00:32:53,905 >> My second question is one of the feedback that I did have 453 00:32:53,905 --> 00:33:01,705 and it is for the pavilion area where it will be performing is 454 00:33:01,865 --> 00:33:05,531 it incorporating the sound and lighting already? 455 00:33:05,531 --> 00:33:08,579 Because it's currently set up now at night time 456 00:33:08,579 --> 00:33:12,411 we have a very hard time listening to the sound and 457 00:33:12,411 --> 00:33:14,225 or the lighting. 458 00:33:14,225 --> 00:33:16,881 When it's start time we can't really 459 00:33:16,881 --> 00:33:18,993 see what's going on on the stage so I 460 00:33:18,993 --> 00:33:21,831 know that's something that was asked in the feedback session 461 00:33:21,831 --> 00:33:27,831 so I don't know if that was reconsidered or considered. 462 00:33:28,638 --> 00:33:32,421 >> I don't know if that building gets into this amount of detail 463 00:33:32,421 --> 00:33:35,433 but definitely some feedback we'd be happy to take back 464 00:33:35,433 --> 00:33:39,345 to the city management and I'm sure those are elements that 465 00:33:39,345 --> 00:33:44,650 they are talking about when we rebuild that amphitheater. 466 00:33:44,650 --> 00:33:47,478 Commissioner Oliveros: That was it for me. 467 00:33:47,478 --> 00:33:49,478 Thank you. 468 00:33:50,185 --> 00:33:51,537 Chair Price: No other questions? 469 00:33:51,537 --> 00:33:54,531 I will now close the public hearing for deliberation. 470 00:33:54,531 --> 00:33:59,331 Would any commissioner like to make a motion? 471 00:34:10,905 --> 00:34:12,905 [Reading names] 472 00:34:23,265 --> 00:34:25,265 The motion passes. 473 00:34:30,547 --> 00:34:35,347 Chair Price: We are now moving to item 4.2. 474 00:34:55,600 --> 00:34:56,142 >> Thank you. 475 00:34:56,142 --> 00:34:57,517 The next item on tonight's agenda 476 00:34:57,517 --> 00:35:01,717 is the main street liquor use permit. 477 00:35:02,913 --> 00:35:07,478 The property is located south of Main Street with the Oakley Town 478 00:35:07,478 --> 00:35:11,522 Center to the west and the Edgewood Drive to the east. 479 00:35:11,522 --> 00:35:16,922 Here is a map that shows the surrounding neighborhood 480 00:35:22,305 --> 00:35:25,205 in the area where the supermarket grocery 481 00:35:25,205 --> 00:35:27,605 store will be located. 482 00:35:27,965 --> 00:35:32,165 A little background the parcel currently consists 483 00:35:34,145 --> 00:35:39,545 of a three story 130 unit age restricted and affordable 484 00:35:39,918 --> 00:35:44,118 senior apartment complex with a one story 5667 485 00:35:44,285 --> 00:35:48,737 square foot commercial space that fronts Main Street. 486 00:35:48,737 --> 00:35:52,205 The General Plan designation is commercial 487 00:35:52,205 --> 00:35:55,625 and zoning is general commercial as well. 488 00:35:55,625 --> 00:35:59,985 The property is surrounded by residential and commercial uses 489 00:35:59,985 --> 00:36:04,785 and the grocery store supermarket proposes to operate 490 00:36:05,673 --> 00:36:06,967 from 7:30 a.m. 491 00:36:06,967 --> 00:36:07,876 To 10 p.m. 492 00:36:07,876 --> 00:36:09,705 Seven days a week. 493 00:36:09,705 --> 00:36:14,505 The applicant is requesting approval of a use permit 494 00:36:14,505 --> 00:36:17,971 to sell distilled spirits alongside other grocery store 495 00:36:17,971 --> 00:36:20,371 slash supermarket offerings including 496 00:36:20,771 --> 00:36:23,171 fruits vegetables and snacks. 497 00:36:23,365 --> 00:36:28,345 No physical changes are proposed for the exterior of this site 498 00:36:28,345 --> 00:36:31,465 or a change in product inventory. 499 00:36:31,465 --> 00:36:34,465 The distilled spirits would be located 500 00:36:34,465 --> 00:36:37,730 within an approximately eight by ten foot shelf 501 00:36:37,730 --> 00:36:41,497 space behind the secure customer service counter only accessible 502 00:36:41,497 --> 00:36:43,345 to an employee. 503 00:36:43,345 --> 00:36:48,145 Why do we have a conditional use permit? 504 00:36:52,305 --> 00:36:54,873 They sell those spirits for off site consumption 505 00:36:54,873 --> 00:36:57,250 have been interpreted as liquor stores 506 00:36:57,250 --> 00:36:59,825 under the Oakley Municipal Code and pursuant to that code 507 00:36:59,825 --> 00:37:01,921 section require a conditional use permit 508 00:37:01,921 --> 00:37:04,135 to establish this use. 509 00:37:04,135 --> 00:37:08,225 The proposed project conforms to the required findings 510 00:37:08,225 --> 00:37:10,874 for approval in the Oakland Municipal Code 511 00:37:10,874 --> 00:37:13,575 partly due to its limited scope and permitted 512 00:37:13,575 --> 00:37:17,175 use of the supermarket grocery store. 513 00:37:18,165 --> 00:37:21,475 The required findings for conditional use permits 514 00:37:21,475 --> 00:37:24,265 are primarily concerned with ensuring quality site 515 00:37:24,265 --> 00:37:27,450 development when a new business is constructed 516 00:37:27,450 --> 00:37:28,565 and that the adjacent infrastructure 517 00:37:28,565 --> 00:37:33,365 is able to accommodate the new land use. 518 00:37:33,745 --> 00:37:37,238 The small size of the shelf space dedicated to the distilled 519 00:37:37,238 --> 00:37:40,225 spirits helps address the concern expressed 520 00:37:40,225 --> 00:37:41,945 within the municipal code. 521 00:37:41,945 --> 00:37:46,625 Furthermore the applicant would integrate the new use 522 00:37:46,625 --> 00:37:50,825 into broader displays within the grocery store. 523 00:37:51,617 --> 00:37:55,349 With liquor purchases occurring at the point of sale 524 00:37:55,349 --> 00:37:57,749 counter like other items. 525 00:38:00,705 --> 00:38:05,505 The project is categorically exempt from the requirements 526 00:38:05,825 --> 00:38:08,825 pursuant to section 15 301 existing facilities. 527 00:38:09,925 --> 00:38:13,305 And staff is recommending the Planning Commission adopt 528 00:38:13,305 --> 00:38:17,505 the resolution approving 2603 Main Street Liquor 2026-001 529 00:38:19,198 --> 00:38:21,198 as commissioned. 530 00:38:22,625 --> 00:38:24,625 Thank you. 531 00:38:35,530 --> 00:38:39,853 Chair Price: Any questions from the Planning Commission? 532 00:38:42,981 --> 00:38:45,481 >> I have a couple of questions but I recommend we have that 533 00:38:45,481 --> 00:38:49,681 members of the public feedback on this. 534 00:38:53,743 --> 00:38:55,865 Chair Price: Are there any comments 535 00:38:55,865 --> 00:39:00,233 from the applicant that would like to come forward and speak 536 00:39:00,233 --> 00:39:02,233 to this? 537 00:39:08,287 --> 00:39:10,745 >> The applicant is here but I don't think they have a full 538 00:39:10,745 --> 00:39:11,287 presentation. 539 00:39:11,287 --> 00:39:15,225 They're just here if there are any questions by the Commission. 540 00:39:15,225 --> 00:39:17,225 Thank you. 541 00:39:19,545 --> 00:39:21,857 Chair Price: This time I have two public comment 542 00:39:21,857 --> 00:39:23,558 cards of people who would like to speak 543 00:39:23,558 --> 00:39:27,758 and the first one is Kathy Ashford. 544 00:39:38,575 --> 00:39:43,395 >> Again I will say that I think alcohol would be a nuisance 545 00:39:43,395 --> 00:39:48,795 for seniors and could attract who knows what type 546 00:39:51,210 --> 00:39:53,313 of environment is going to be coming and I'm not trying 547 00:39:53,313 --> 00:39:56,865 to have a biased attitude but I just don't think it's a good 548 00:39:56,865 --> 00:39:58,910 place for seniors. 549 00:39:58,910 --> 00:40:03,482 We try to live a quiet life and I 550 00:40:03,482 --> 00:40:06,945 think it would probably draw a lot of different kind of people 551 00:40:06,945 --> 00:40:12,945 especially with alcohol on Friday nights seven days a week. 552 00:40:16,425 --> 00:40:19,410 So the same response I said earlier 553 00:40:19,410 --> 00:40:22,337 that I think it would be a nuisance. 554 00:40:22,337 --> 00:40:24,337 Thank you. 555 00:40:29,909 --> 00:40:35,909 Chair Price: We have one other public comment Lynda Carter. 556 00:40:40,932 --> 00:40:41,599 >> Good evening. 557 00:40:41,599 --> 00:40:43,689 I didn't know I would be talking either. 558 00:40:43,689 --> 00:40:46,833 I just wanted to reiterate what my predecessor said 559 00:40:46,833 --> 00:40:49,385 about the fact that with the people that 560 00:40:49,385 --> 00:40:51,202 moved in there have moved in there for it 561 00:40:51,202 --> 00:40:56,105 to be a quiet place to relax and at a certain time of the evening 562 00:40:56,105 --> 00:40:59,118 it's quiet and there isn't a lot of traffic or noise 563 00:40:59,118 --> 00:41:01,579 and especially the people that live on the north 564 00:41:01,579 --> 00:41:05,285 side of the building it's going to face the parking lot. 565 00:41:05,285 --> 00:41:08,180 These are the people that are coming into this 566 00:41:08,180 --> 00:41:09,545 are going to be going through. 567 00:41:09,545 --> 00:41:11,838 It's just not something -- 568 00:41:11,838 --> 00:41:14,601 I know we signed a paper knowing something commercial 569 00:41:14,601 --> 00:41:16,585 would go into that area but I don't 570 00:41:16,585 --> 00:41:18,329 know that anybody realizes this is 571 00:41:18,329 --> 00:41:21,628 what was going to go in there so I just want to again state 572 00:41:21,628 --> 00:41:24,713 that I wish they wouldn't be selling alcohol just 573 00:41:24,713 --> 00:41:27,558 for the sake of the people that live there 574 00:41:27,558 --> 00:41:29,505 and the peace of the community currently 575 00:41:29,505 --> 00:41:31,185 for it to not be disturbed. 576 00:41:31,185 --> 00:41:33,185 Thank you. 577 00:41:37,210 --> 00:41:38,168 Chair Price: Thank you. 578 00:41:38,168 --> 00:41:40,545 I will now close the public hearing for deliberation. 579 00:41:40,545 --> 00:41:44,745 Are there any comments from the commissioners? 580 00:41:56,387 --> 00:41:58,345 Commissioner Ireland: I had a lot of questions. 581 00:41:58,345 --> 00:42:00,947 I was concerned about the effect so I 582 00:42:00,947 --> 00:42:03,750 do have a few questions in my main concern 583 00:42:03,750 --> 00:42:05,625 is about any kind of guardrails in place here. 584 00:42:05,625 --> 00:42:07,643 Reading through the resolution it 585 00:42:07,643 --> 00:42:09,330 seems like if there was a problem 586 00:42:09,330 --> 00:42:10,873 there is an allowance for withdrawal 587 00:42:10,873 --> 00:42:12,660 so without getting too granular I 588 00:42:12,660 --> 00:42:14,785 think I'd like to better understand what that looks 589 00:42:14,785 --> 00:42:16,927 like if there is a problem. 590 00:42:16,927 --> 00:42:19,538 It looks like the period goes through a one year period 591 00:42:19,538 --> 00:42:22,500 and then there is some kind of renewal process. 592 00:42:22,500 --> 00:42:24,665 Is that automatic and someone would 593 00:42:24,665 --> 00:42:28,442 have to step in to withdraw it or what does that look like 594 00:42:28,442 --> 00:42:32,420 as far as renewal of this? 595 00:42:35,762 --> 00:42:38,540 >> The use permit would grant the sale of the distilled 596 00:42:38,540 --> 00:42:40,540 spirits . 597 00:42:41,750 --> 00:42:45,525 The grocery store supermarket is a permitted use. 598 00:42:45,525 --> 00:42:49,329 They are able to sell beer and wine 599 00:42:49,329 --> 00:42:52,498 without the requirement of a use permit 600 00:42:52,498 --> 00:42:54,898 as the presentation mentioned. 601 00:42:56,340 --> 00:42:59,825 It is the sale of distilled spirits 602 00:42:59,825 --> 00:43:02,195 for off site consumption that triggers 603 00:43:02,195 --> 00:43:04,595 that use permit requirement. 604 00:43:06,215 --> 00:43:08,785 The resolution as you've mentioned 605 00:43:08,785 --> 00:43:10,177 does have those built in triggers 606 00:43:10,177 --> 00:43:13,131 that if it does become a nuisance the Community 607 00:43:13,131 --> 00:43:15,405 Development director along with the police chief 608 00:43:15,405 --> 00:43:22,605 can revoke that permit or if it does become a nuisance then 609 00:43:23,170 --> 00:43:29,170 they can speak to that a little bit more at. 610 00:43:31,710 --> 00:43:33,793 >> So condition of approval number seven I believe 611 00:43:33,793 --> 00:43:34,889 you're referring to. 612 00:43:34,889 --> 00:43:38,610 It was written in a way to provide 613 00:43:38,610 --> 00:43:41,628 city staff with a bit of flexibility 614 00:43:41,628 --> 00:43:45,865 if there's minor inconveniences that could be potentially 615 00:43:45,865 --> 00:43:48,505 addressed by the police chief and or community development 616 00:43:48,505 --> 00:43:51,638 director and we could implement those on the business. 617 00:43:51,638 --> 00:43:56,489 If there was a more egregious offense or a bigger nuisance 618 00:43:56,489 --> 00:44:00,195 we always have the opportunity to bring the item back 619 00:44:00,195 --> 00:44:02,705 to the Planning Commission for reconsideration. 620 00:44:02,705 --> 00:44:06,735 That reconsideration can include anything from modification 621 00:44:06,735 --> 00:44:10,913 to conditions of approval such as the hours of operation, 622 00:44:10,913 --> 00:44:15,736 the size of the shelf space, and even revocation of the use 623 00:44:15,736 --> 00:44:17,361 permit which would remove their ability 624 00:44:17,361 --> 00:44:18,945 to sell the distilled spirits. 625 00:44:18,945 --> 00:44:23,425 So all of those options are on the table in the resolution as 626 00:44:23,425 --> 00:44:25,425 presented tonight. 627 00:44:26,305 --> 00:44:28,559 Commissioner Ireland: So if this does turn out 628 00:44:28,559 --> 00:44:32,556 to be an issue if yourself the community development director 629 00:44:32,556 --> 00:44:34,431 or city police feel like there's a problem we 630 00:44:34,431 --> 00:44:37,905 do have an opportunity to come back from this come on not just 631 00:44:37,905 --> 00:44:42,250 once we say yes it's going to be a thing in perpetuity. 632 00:44:42,250 --> 00:44:44,250 >> Absolutely true. 633 00:44:45,250 --> 00:44:47,406 Commissioner Ireland: That's my main concern in. 634 00:44:47,406 --> 00:44:49,497 And we have a couple of public comments tonight 635 00:44:49,497 --> 00:44:52,529 and I don't know if this is appropriate but were there 636 00:44:52,529 --> 00:44:54,177 any other comments you were seeing 637 00:44:54,177 --> 00:44:56,985 from any members of that community or anyone 638 00:44:56,985 --> 00:45:00,345 around about this that had called the planning 639 00:45:00,345 --> 00:45:04,545 department as questions or anything like that? 640 00:45:04,905 --> 00:45:07,905 >> I did not receive any. 641 00:45:12,620 --> 00:45:14,620 >> Okay. 642 00:45:43,208 --> 00:45:45,583 >> Just to quickly clarify for the commission if you want 643 00:45:45,583 --> 00:45:48,177 to receive additional public testimony you would need to move 644 00:45:48,177 --> 00:45:51,177 to reopen the public hearing. 645 00:45:51,705 --> 00:45:59,505 >> I could pause my time if we want to open up public comment. 646 00:46:01,738 --> 00:46:03,696 Commissioner Ireland: If you can fill up a card 647 00:46:03,696 --> 00:46:10,296 you can come up and make a comment if you'd like. 648 00:46:11,385 --> 00:46:14,505 And we are happy to wait. 649 00:46:14,505 --> 00:46:15,931 We can take our time. 650 00:46:15,931 --> 00:46:18,931 I would greatly appreciate that. 651 00:46:19,705 --> 00:46:23,465 Chair Price: We will reopen the public hearing 652 00:46:23,465 --> 00:46:27,650 and address these comments coming forward. 653 00:46:45,939 --> 00:46:47,650 >> Thank you. 654 00:46:47,650 --> 00:46:50,665 We are all very old seniors. 655 00:46:51,505 --> 00:46:53,351 Sickly and can't hardly get around 656 00:46:53,351 --> 00:46:58,153 so the alcohol is a problem but the problem 657 00:46:58,153 --> 00:47:02,353 is security and the parking, the way 658 00:47:04,399 --> 00:47:06,245 the cars are going to come in. 659 00:47:06,245 --> 00:47:11,445 So that's the problem we are having and we 660 00:47:11,445 --> 00:47:15,135 know that they sell alcohol right up the hill 661 00:47:15,135 --> 00:47:17,413 and there's another place. 662 00:47:17,413 --> 00:47:22,339 Why do we have to sell it next door to us? 663 00:47:22,339 --> 00:47:25,553 When we become seniors, we wanted 664 00:47:25,553 --> 00:47:31,582 to get away from that kind of stuff not add to it. 665 00:47:31,582 --> 00:47:36,801 So we moved that to have a resting place, not a place 666 00:47:36,801 --> 00:47:40,673 where there's going to be lots of noise and lots 667 00:47:40,673 --> 00:47:46,500 of people acting stupid because they are drinking alcohol. 668 00:47:46,500 --> 00:47:48,500 Can you understand? 669 00:47:52,545 --> 00:47:56,145 You don't want all of that. 670 00:47:56,522 --> 00:48:01,465 So I'm asking you all tonight to consider what you're doing 671 00:48:01,465 --> 00:48:05,755 and think about how you want your life to be when 672 00:48:05,755 --> 00:48:08,585 you get to be as old as we are. 673 00:48:08,585 --> 00:48:10,585 Thank you. 674 00:48:19,809 --> 00:48:21,689 Chair Price: That is all the public comment. 675 00:48:21,689 --> 00:48:25,105 Did we have any other cards that were turned in? 676 00:48:25,105 --> 00:48:27,505 >> No other comment cards. 677 00:49:06,820 --> 00:49:09,864 Chair Price: Next, Ava Jackson please. 678 00:49:09,864 --> 00:49:15,264 That was the one that was -- all right. 679 00:49:22,545 --> 00:49:24,545 Rosetta Samson? 680 00:49:38,404 --> 00:49:43,804 >> I live in the apartments there at 2605 Main Street. 681 00:49:45,110 --> 00:49:50,411 I've been there for four years and the way 682 00:49:51,500 --> 00:49:56,379 they have the parking is to the side of the store 683 00:49:56,379 --> 00:49:59,170 and there's a gate there that we come out 684 00:49:59,170 --> 00:50:03,450 of and it's going to be very congested 685 00:50:03,450 --> 00:50:08,265 and the way we go in which is wrong, 686 00:50:08,265 --> 00:50:12,985 there are two entrances when we are coming from lucky shopping 687 00:50:12,985 --> 00:50:18,105 center we turn into the first one and we go around to the left 688 00:50:18,105 --> 00:50:19,425 and go in. 689 00:50:19,425 --> 00:50:25,978 Then when we come out all the way around we go out on the same 690 00:50:25,978 --> 00:50:26,871 one -- 691 00:50:26,871 --> 00:50:28,317 on a different one. 692 00:50:28,317 --> 00:50:32,550 And it should be reversed because when we go in, 693 00:50:32,550 --> 00:50:36,925 we go to the right and it's the first one we go in 694 00:50:36,925 --> 00:50:41,665 and the ones coming out are going to be in front of us. 695 00:50:41,665 --> 00:50:44,773 And another thing there has been a lot of riff Raff 696 00:50:44,773 --> 00:50:48,502 there that try to come in some of the people that 697 00:50:48,502 --> 00:50:51,105 live there have their friends or whatever 698 00:50:51,105 --> 00:50:55,305 and there's a lot of different people. 699 00:50:55,401 --> 00:50:59,110 They will sleep on the bench outside and all of this stuff 700 00:50:59,110 --> 00:51:02,809 and have liquor there I don't think 701 00:51:02,809 --> 00:51:05,597 so unless they have a security guard 702 00:51:05,597 --> 00:51:08,794 because it is going to be terrible 703 00:51:08,794 --> 00:51:12,305 and that's not where I want to be. 704 00:51:12,305 --> 00:51:17,345 We waited for this place before COVID to open 705 00:51:17,345 --> 00:51:20,945 and I just wish no liquor. 706 00:51:21,531 --> 00:51:26,931 They can go to Lucky's and get their liquor. 707 00:51:32,145 --> 00:51:34,550 I said security. 708 00:51:34,550 --> 00:51:37,617 Of the store is going to be open that late they 709 00:51:37,617 --> 00:51:40,170 need to have security. 710 00:51:41,145 --> 00:51:43,145 Thank you. 711 00:51:56,880 --> 00:51:58,297 Chair Price: Looking for a comment 712 00:51:58,297 --> 00:52:01,297 from one of the commissioners? 713 00:52:09,598 --> 00:52:11,931 Commissioner Ireland: The only other question I had here 714 00:52:11,931 --> 00:52:14,297 and I did send this ahead of time just 715 00:52:14,297 --> 00:52:15,873 to make sure his advertising. 716 00:52:15,873 --> 00:52:20,878 If this is passed it is limited to essentially a cabinet is 717 00:52:20,878 --> 00:52:22,771 what it looks like and the display needs 718 00:52:22,771 --> 00:52:25,198 to be kept in that area. 719 00:52:25,198 --> 00:52:29,438 It sounds like there is already a city municipal code 720 00:52:29,438 --> 00:52:33,278 about advertising signage outside that if this is approved 721 00:52:33,278 --> 00:52:36,145 it would not be permitted for them to put 722 00:52:36,145 --> 00:52:39,121 large signs on the exterior of the building 723 00:52:39,121 --> 00:52:41,521 or anything like that. 724 00:52:41,598 --> 00:52:44,505 >> They would still be subject to our sign ordinance and any 725 00:52:44,505 --> 00:52:46,505 other requirements therein. 726 00:52:48,145 --> 00:52:51,145 Commissioner Ireland: I'm not super familiar with the sign 727 00:52:51,145 --> 00:52:53,835 limits so perhaps I should have read it before the meeting. 728 00:52:53,835 --> 00:52:55,905 That would preclude advertisements 729 00:52:55,905 --> 00:52:58,905 for distilled spirits like this? 730 00:53:01,490 --> 00:53:03,865 >> Generally we don't permit large advertisements of beer 731 00:53:03,865 --> 00:53:06,265 and things like that. 732 00:53:11,145 --> 00:53:17,745 Trying to think of what sign you may have in mind. 733 00:53:19,461 --> 00:53:21,211 Commissioner Ireland: Excuse the hyperbole 734 00:53:21,211 --> 00:53:24,285 but a giant sign that says buy tequila in here. 735 00:53:24,285 --> 00:53:27,225 It seems like the scope of this is intended to be small 736 00:53:27,225 --> 00:53:31,201 and my one concern is always is guardrails with what you don't 737 00:53:31,201 --> 00:53:32,805 think about that could happen and it 738 00:53:32,805 --> 00:53:36,275 seems like we have a way to claw it back 739 00:53:36,275 --> 00:53:39,593 but I'm concerned about what slips through the cracks given 740 00:53:39,593 --> 00:53:42,230 the nature of where this is going to be which again I 741 00:53:42,230 --> 00:53:44,630 have some concerns about. 742 00:53:47,796 --> 00:53:48,379 >> Understood. 743 00:53:48,379 --> 00:53:51,585 Any indoor signage we don't necessarily 744 00:53:51,585 --> 00:53:55,185 look at but windows signage common 745 00:53:58,337 --> 00:54:02,278 signage they may think of having on the exterior would all 746 00:54:02,278 --> 00:54:06,385 be reviewed or we would look at in our limited 747 00:54:06,385 --> 00:54:08,785 by the sign ordinance. 748 00:54:14,405 --> 00:54:16,905 Vice Chair Harvey: Is this the same location that our police 749 00:54:16,905 --> 00:54:21,545 department went in and evaluated and looked at how small it was 750 00:54:21,545 --> 00:54:24,855 going to be and they didn't really think that there would be 751 00:54:24,855 --> 00:54:29,235 -- >> Typically as part of our review process we route plans 752 00:54:29,235 --> 00:54:32,553 out to public use to review. 753 00:54:32,553 --> 00:54:35,553 There weren't any adherent concerns 754 00:54:35,835 --> 00:54:40,350 with their proposal for a secure area 755 00:54:41,337 --> 00:54:47,937 where cabinet behind the counter that would be similar to other 756 00:54:49,545 --> 00:54:53,145 previously approved distilled spirit use permits. 757 00:55:02,360 --> 00:55:03,985 Commissioner Goudie: The public concern 758 00:55:03,985 --> 00:55:06,491 is about a lot of the double dashes 759 00:55:06,491 --> 00:55:08,785 there a way that we can fix something 760 00:55:08,785 --> 00:55:10,585 because the store isn't even open yet 761 00:55:10,585 --> 00:55:15,845 so they're going to experience this without the liquor. 762 00:55:15,845 --> 00:55:21,825 >> Is part of the use permit that is not proposed to change 763 00:55:21,825 --> 00:55:27,553 the site circulation parking come a number of parking stalls 764 00:55:27,553 --> 00:55:32,755 it was all previously reviewed in around 2019 when the overall 765 00:55:32,755 --> 00:55:38,769 project was reviewed it was more in depth formal review of that 766 00:55:38,769 --> 00:55:44,617 was conducted then which at that point the commercial aspect 767 00:55:44,617 --> 00:55:51,735 of the project was also reviewed but again that was back in 2019 768 00:55:51,735 --> 00:55:53,735 the original project. 769 00:56:03,153 --> 00:56:05,361 Commissioner Goudie: Would that On the property owner 770 00:56:05,361 --> 00:56:09,985 if they decided for a security guard or something like that? 771 00:56:09,985 --> 00:56:12,415 >> The security guard component I don't know if that would 772 00:56:12,415 --> 00:56:16,615 necessarily be a condition we can impose . 773 00:56:20,649 --> 00:56:23,649 A supermarket or grocery store . 774 00:56:29,777 --> 00:56:30,777 >> I can chime in a bit. 775 00:56:30,777 --> 00:56:32,690 It would be a unique condition. 776 00:56:32,690 --> 00:56:33,755 I will say that. 777 00:56:33,755 --> 00:56:36,205 We have several of these similar types 778 00:56:36,205 --> 00:56:38,711 of use permits for convenience stores mostly 779 00:56:38,711 --> 00:56:42,409 and the liquor store is a bit misleading. 780 00:56:42,409 --> 00:56:44,649 When people think liquor store they 781 00:56:44,649 --> 00:56:47,277 think a store that is predominantly selling liquor. 782 00:56:47,277 --> 00:56:54,477 This is a small -- relatively small area to hold the distilled 783 00:56:55,569 --> 00:57:00,825 spirits so the conditional use permit being presented tonight 784 00:57:00,825 --> 00:57:06,905 limits how large of an area they can store and display liquor 785 00:57:06,905 --> 00:57:10,769 and it's approximately ten foot by eight foot area behind 786 00:57:10,769 --> 00:57:14,971 the counter so this is not going to be similar to a store where 787 00:57:14,971 --> 00:57:17,785 you may walk in and have shelves of liquor available 788 00:57:17,785 --> 00:57:21,878 for the public to grab and take up to the counter. 789 00:57:21,878 --> 00:57:25,205 This would require someone that wanted to purchase the distilled 790 00:57:25,205 --> 00:57:28,831 spirits to go up to the counter and ask for the clerk 791 00:57:28,831 --> 00:57:32,841 to provide them and sell them that specific bottle 792 00:57:32,841 --> 00:57:34,965 or whatever they may be purchasing. 793 00:57:34,965 --> 00:57:39,671 Security has not been something in my memory 794 00:57:39,671 --> 00:57:43,819 at least that we have required for this type of use. 795 00:57:43,819 --> 00:57:47,921 I think if we were at a point where the issues were such 796 00:57:47,921 --> 00:57:51,931 that security was required we would definitely 797 00:57:51,931 --> 00:57:55,665 be questioning whether the conditional use permit could 798 00:57:55,665 --> 00:57:56,785 be approved. 799 00:57:56,785 --> 00:58:00,900 I don't know if we have a reason to believe that. 800 00:58:00,900 --> 00:58:02,425 I understand many of the concerns 801 00:58:02,425 --> 00:58:05,398 and I definitely understand where those are coming from. 802 00:58:05,398 --> 00:58:11,500 At this point we have not heard from our police department 803 00:58:11,500 --> 00:58:13,881 of any issues with any of the other recent ones 804 00:58:13,881 --> 00:58:21,810 to have very limited sales and this one is similar to that. 805 00:58:22,705 --> 00:58:27,610 I would say just looking at the other approvals we have not 806 00:58:27,610 --> 00:58:30,100 seen such issues reoccurring. 807 00:58:33,865 --> 00:58:36,457 Staff we can provide this input. 808 00:58:36,457 --> 00:58:38,857 The applicant is here. 809 00:58:38,985 --> 00:58:42,555 I would encourage the commission to ask them what their plans are 810 00:58:42,555 --> 00:58:44,799 and what plans they have in place to try 811 00:58:44,799 --> 00:58:48,562 to minimize loitering or people that may be breaking the rules. 812 00:58:48,562 --> 00:58:51,417 This is not for on site consumption. 813 00:58:51,417 --> 00:58:54,500 This is for off site consumption. 814 00:58:54,500 --> 00:58:57,270 You purchase it and take it home. 815 00:58:57,270 --> 00:58:59,657 So that would be my recommendation 816 00:58:59,657 --> 00:59:02,250 is to allow the applicant to come up and address 817 00:59:02,250 --> 00:59:08,744 some of these and staff will continue to try to address them. 818 00:59:08,744 --> 00:59:10,869 >> If the applicant is willing I think we could ask 819 00:59:10,869 --> 00:59:13,244 if they're willing to address any of these concerns about 820 00:59:13,244 --> 00:59:16,801 on site consumption and security issues that have been brought up 821 00:59:16,801 --> 00:59:19,801 because it's a delicate situation. 822 00:59:20,705 --> 00:59:24,465 Commissioner Oliveros: Just to confirm only beer and wine is 823 00:59:24,465 --> 00:59:27,465 going to be sold there? 824 00:59:36,168 --> 00:59:37,985 >> Good evening everybody. 825 00:59:37,985 --> 00:59:45,185 So with regards to the signs it was stipulated by the landlord 826 00:59:49,685 --> 00:59:55,835 that we cannot have any outside signs so besides our normal 827 00:59:55,835 --> 00:59:57,638 business signage that's it. 828 00:59:57,638 --> 01:00:00,550 We are not going to say we sell this or that. 829 01:00:00,550 --> 01:00:05,425 Is just going to be our name of the store and that's it. 830 01:00:05,425 --> 01:00:07,825 That's regarding the sign. 831 01:00:09,625 --> 01:00:13,225 With regards to parking or entrance 832 01:00:15,505 --> 01:00:19,105 we each have our own entrance. 833 01:00:19,153 --> 01:00:23,222 So the seniors come to their residential space 834 01:00:23,222 --> 01:00:25,889 or whatever you want to call it they have their private interest 835 01:00:25,889 --> 01:00:28,737 and we have our own private entrance 836 01:00:28,737 --> 01:00:35,545 but with regards to the exit it is one exit so we share an exit. 837 01:00:35,545 --> 01:00:38,105 However it is spaced well and anybody 838 01:00:38,105 --> 01:00:40,105 that has a driver's license should be 839 01:00:40,105 --> 01:00:43,415 able to exit without a problem. 840 01:00:43,415 --> 01:00:50,150 With regards to -- with regards to security we are security. 841 01:00:56,100 --> 01:01:00,167 We have had stores in the surrounding area for the last 15 842 01:01:00,167 --> 01:01:06,289 or 20 years with a good track record of no crime happening 843 01:01:06,289 --> 01:01:10,935 in front of the stores or the surrounding areas . 844 01:01:10,935 --> 01:01:16,305 And we have a very good name and reputation for our stores. 845 01:01:16,305 --> 01:01:20,278 I think their main concern is noise 846 01:01:20,278 --> 01:01:23,282 so it doesn't matter if it's a store 847 01:01:23,282 --> 01:01:27,609 or if it's a bungee jumping place for kids or trampolines. 848 01:01:27,609 --> 01:01:31,585 I think they just want quietness but as for people 849 01:01:31,585 --> 01:01:35,780 who I think their problem is more so 850 01:01:35,780 --> 01:01:37,713 with the landlord if anything. 851 01:01:37,713 --> 01:01:43,751 We are running a normal business and applying for a normal part 852 01:01:43,751 --> 01:01:46,751 of modern supermarket to occur. 853 01:01:48,100 --> 01:01:50,601 I think that's about it. 854 01:01:50,601 --> 01:01:54,801 Is there anything else I can address? 855 01:01:56,243 --> 01:01:57,660 Commissioner Ireland: One question 856 01:01:57,660 --> 01:01:59,705 I would have is a mixed use development 857 01:01:59,705 --> 01:02:02,913 do you see your business as your customers are more 858 01:02:02,913 --> 01:02:06,910 coming into the area from the rest of Oakley and other areas 859 01:02:06,910 --> 01:02:08,785 or are you supporting the residents of the building 860 01:02:08,785 --> 01:02:09,590 that you're in? 861 01:02:09,590 --> 01:02:13,850 Where do you see a mixture of that? 862 01:02:13,850 --> 01:02:17,285 >> We are a store open to everybody. 863 01:02:17,465 --> 01:02:19,265 We come from China. 864 01:02:19,265 --> 01:02:21,582 We close at 10 p.m.. 865 01:02:21,582 --> 01:02:24,718 So it's not like a 2 a.m. 866 01:02:24,718 --> 01:02:25,785 Store. 867 01:02:25,785 --> 01:02:29,329 As far as customers are concerned 868 01:02:29,329 --> 01:02:35,329 whoever wants to be a customer they're allowed to come. 869 01:02:36,145 --> 01:02:38,995 As long as they are able to purchase 870 01:02:38,995 --> 01:02:43,235 and are respectful customers and we have good relationships 871 01:02:43,235 --> 01:02:47,435 with the Oakley Police and as long 872 01:02:48,973 --> 01:02:52,493 as we are keeping things safe then I don't see a problem. 873 01:02:52,493 --> 01:02:58,865 And we also reserve the right to refuse service to anybody. 874 01:02:58,865 --> 01:03:02,500 Commissioner Ireland: That was the only question I had. 875 01:03:02,500 --> 01:03:04,500 Thank you. 876 01:03:07,656 --> 01:03:09,983 Commissioner Oliveros: Does the landlord or tenants 877 01:03:09,983 --> 01:03:12,383 live here in Oakley? 878 01:03:12,825 --> 01:03:15,825 >> We are here in Oakley. 879 01:03:16,195 --> 01:03:17,945 Commissioner Oliveros: So you know that we 880 01:03:17,945 --> 01:03:20,345 are a bedroom community. 881 01:03:21,725 --> 01:03:25,739 It means that everything shuts down around 8 p.m. 882 01:03:25,739 --> 01:03:31,811 Here so I don't understand the reason of opening until 10 p.m.. 883 01:03:31,811 --> 01:03:34,481 I think we are putting guardrails 884 01:03:34,481 --> 01:03:36,225 we would probably need to revisit 885 01:03:36,225 --> 01:03:39,225 what those hours look like. 886 01:03:39,945 --> 01:03:45,425 The second piece is has there been a traffic report analysis 887 01:03:45,425 --> 01:03:50,665 of how many people are driving through there and have we seen 888 01:03:50,665 --> 01:03:56,265 a huge influx of traffic that this needs to be here between 889 01:03:56,265 --> 01:04:01,650 the hours of the evening which is -- 890 01:04:02,630 --> 01:04:04,105 I'm just curious if there's been a traffic report 891 01:04:04,105 --> 01:04:06,105 analysis on this. 892 01:04:07,945 --> 01:04:11,265 >> Not on this specific conditional use permit before 893 01:04:11,265 --> 01:04:12,161 you tonight. 894 01:04:12,161 --> 01:04:16,961 As Jose mentioned the 2019 senior Residence Mixed Use 895 01:04:17,913 --> 01:04:22,753 project was proposed to the city as on a commercial piece 896 01:04:22,753 --> 01:04:28,753 of property to have mostly apartments with a small -- 897 01:04:28,906 --> 01:04:31,577 500 zero square foot or less commercial component 898 01:04:31,577 --> 01:04:35,169 and at that time the site plan was analyzed and went 899 01:04:35,169 --> 01:04:38,640 through all of the environmental study and everything checked 900 01:04:38,640 --> 01:04:39,249 out. 901 01:04:39,249 --> 01:04:43,150 So if there are issues with the apartments 902 01:04:43,150 --> 01:04:45,991 and the operation of the gates or whatever 903 01:04:45,991 --> 01:04:50,767 it may be with residents being able to exit the gates 904 01:04:50,767 --> 01:04:53,564 and I know there have been issues completely unrelated 905 01:04:53,564 --> 01:04:57,778 to this project tonight with the gates and things like that 906 01:04:57,778 --> 01:05:00,957 in the past that management has had to work out, 907 01:05:00,957 --> 01:05:04,545 that is really not on the applicant to solve. 908 01:05:04,545 --> 01:05:06,545 Those are gates for the customers -- 909 01:05:06,545 --> 01:05:11,604 for the residents to get into the gated off portion of parking 910 01:05:11,604 --> 01:05:15,331 because the site has a gated portion which is on the sides 911 01:05:15,331 --> 01:05:19,113 of the apartments and the back of the apartments and then there 912 01:05:19,113 --> 01:05:22,625 is what we would call public parking that is in the front 913 01:05:22,625 --> 01:05:28,225 of the building for would be tenants to talk to customers 914 01:05:28,225 --> 01:05:32,838 of the commercial locations where they can use those. 915 01:05:32,838 --> 01:05:36,128 So two separate parking areas but there 916 01:05:36,128 --> 01:05:40,965 is a gate that you access from the public parking 917 01:05:40,965 --> 01:05:43,365 to the private parking. 918 01:05:44,693 --> 01:05:47,305 A traffic study not so much. 919 01:05:47,305 --> 01:05:50,410 What we look at is is circulation safe? 920 01:05:50,410 --> 01:05:56,410 Is there a turning radius for things of that nature. 921 01:05:56,705 --> 01:05:59,309 Commissioner Oliveros: I think as any business 922 01:05:59,309 --> 01:06:03,761 that's going to open that should be part of their analysis right? 923 01:06:03,761 --> 01:06:06,781 Does it make sense to be selling this here 924 01:06:06,781 --> 01:06:10,381 where Lucky's is right next door. 925 01:06:11,500 --> 01:06:16,465 How is this going to benefit the senior community there? 926 01:06:16,465 --> 01:06:20,650 What is in it for them? 927 01:06:24,820 --> 01:06:24,749 >> I understand. 928 01:06:24,749 --> 01:06:26,545 Going back to your first question regarding 929 01:06:26,545 --> 01:06:29,390 why we are open until ten. 930 01:06:29,390 --> 01:06:34,780 If the community is a bedroom community then being open until 931 01:06:34,780 --> 01:06:38,505 -- and not much traffic will occur after eight so it 932 01:06:38,505 --> 01:06:42,625 doesn't really matter whether or not we are open from seven 933 01:06:42,625 --> 01:06:46,380 to eight or 7 to 10 but those extra two hours does give 934 01:06:46,380 --> 01:06:52,380 a little bit of leeway for any people who -- 935 01:06:52,877 --> 01:06:55,553 if they want to make a late night bowl of cereal and they 936 01:06:55,553 --> 01:06:58,530 forgot their milk and they don't have any milk and just want 937 01:06:58,530 --> 01:07:00,745 to go real quick to the grocery store. 938 01:07:00,745 --> 01:07:02,745 I understand. 939 01:07:03,185 --> 01:07:06,785 It's just a part of business. 940 01:07:08,305 --> 01:07:10,705 Commissioner Oliveros: And second 941 01:07:11,113 --> 01:07:15,545 question how does this benefit the senior community? 942 01:07:15,545 --> 01:07:17,545 >> It's a supermarket. 943 01:07:18,745 --> 01:07:20,928 Commissioner Oliveros: Those are all my questions. 944 01:07:20,928 --> 01:07:22,928 Thank you. 945 01:07:26,352 --> 01:07:26,852 Chair Price: 946 01:07:26,852 --> 01:07:29,415 any other comments from the commissioners? 947 01:07:29,415 --> 01:07:32,545 We will now close the public hearing. 948 01:07:32,545 --> 01:07:34,458 Would any commissioner like to make a motion 949 01:07:34,458 --> 01:07:36,858 to adopt the resolution? 950 01:07:38,185 --> 01:07:42,985 Commissioner Oliveros: I do not approve this resolution. 951 01:07:51,243 --> 01:07:53,785 Commissioner Ireland: It seems like we have strong guardrails 952 01:07:53,785 --> 01:07:57,385 but I just don't see a compelling reason to approve. 953 01:07:57,385 --> 01:07:59,305 Is just too close to a community so I'm not 954 01:07:59,305 --> 01:08:02,305 going to make a motion. 955 01:08:09,865 --> 01:08:14,553 Can I ask a question of the city attorney just as a process 956 01:08:14,553 --> 01:08:16,289 because I don't think we've quite 957 01:08:16,289 --> 01:08:18,247 had this happen where none of the commissioners 958 01:08:18,247 --> 01:08:20,865 want to make a motion to approve do we table 959 01:08:20,865 --> 01:08:25,665 or what is the next step for us? 960 01:08:26,318 --> 01:08:28,568 >> If there is no motion then no action has been taken 961 01:08:28,568 --> 01:08:30,568 on the item . 962 01:08:32,209 --> 01:08:35,225 In addition a commissioner could make the motion to table 963 01:08:35,225 --> 01:08:40,111 the item to a specific date in the future at the next Planning 964 01:08:40,111 --> 01:08:42,326 Commission meeting or when in the future so 965 01:08:42,326 --> 01:08:44,185 that could be an alternative motion 966 01:08:44,185 --> 01:08:46,505 to table this item to a future meeting. 967 01:08:46,505 --> 01:08:48,505 For further discussion. 968 01:08:48,865 --> 01:08:53,650 Otherwise there no action taken on item. 969 01:08:55,625 --> 01:08:59,257 Vice Chair Harvey: I will make a motion to table this agenda item 970 01:08:59,257 --> 01:09:01,657 until the next -- 971 01:09:05,737 --> 01:09:07,945 >> Can I ask a clarifying question of the Commission? 972 01:09:07,945 --> 01:09:09,850 Normally when we are tabling an item 973 01:09:09,850 --> 01:09:12,900 or continuing it to a date certain 974 01:09:12,900 --> 01:09:14,737 there is some direction provided to staff 975 01:09:14,737 --> 01:09:18,625 or additional information the Commission wants us to analyze. 976 01:09:18,625 --> 01:09:23,562 We don't want to just bring back the same thing on June 16th 977 01:09:23,562 --> 01:09:28,322 so we would ask that if that is what the Commission is going 978 01:09:28,322 --> 01:09:31,401 to end up doing that staff provides some additional 979 01:09:31,401 --> 01:09:31,901 direction. 980 01:09:31,901 --> 01:09:34,219 What do you want us to look into? 981 01:09:34,219 --> 01:09:37,445 Do you see a solution to this to move forward? 982 01:09:37,445 --> 01:09:40,729 Are there additional conditions on signage or anything 983 01:09:40,729 --> 01:09:42,496 that you want us to look at and bring back 984 01:09:42,496 --> 01:09:47,296 for consideration in addition to what's already being 985 01:09:50,425 --> 01:09:50,925 Commissioner 986 01:09:50,925 --> 01:09:51,298 Ireland: I would definitely support coming back 987 01:09:51,298 --> 01:09:52,798 in looking at this because I do want 988 01:09:52,798 --> 01:09:55,445 to balance the right of the applicant with the residents. 989 01:09:55,445 --> 01:09:58,161 I think my larger concern is how this affects 990 01:09:58,161 --> 01:10:01,673 the residents and not just the issues that came up 991 01:10:01,673 --> 01:10:05,521 but selling distilled spirits is another step 992 01:10:05,521 --> 01:10:09,721 beyond a normal market and I understand 993 01:10:10,465 --> 01:10:12,931 that but I would just like to understand better 994 01:10:12,931 --> 01:10:16,533 how we are going to prevent any issues especially with things 995 01:10:16,533 --> 01:10:20,250 going on being right next to a resident 996 01:10:20,250 --> 01:10:23,250 selling that kind of liquor. 997 01:10:23,465 --> 01:10:25,562 Commissioner Oliveros: They're not even open 998 01:10:25,562 --> 01:10:28,505 yet so we don't know what that traffic will 999 01:10:28,505 --> 01:10:32,233 look like so I think we are getting ahead 1000 01:10:32,233 --> 01:10:35,273 of ourselves of this whole piece in terms of this. 1001 01:10:35,273 --> 01:10:40,730 Can we wait and see how this traffic 1002 01:10:40,153 --> 01:10:43,321 is going come out how the residents are feeling in terms 1003 01:10:43,321 --> 01:10:48,121 of noise and Vice Chair Harvey: Could we 1004 01:10:49,785 --> 01:10:52,118 have an evaluation of any possible changes that could be 1005 01:10:52,118 --> 01:10:56,918 made to approve the traffic >> Could you repeat 1006 01:10:57,298 --> 01:10:58,465 the last part of that again? 1007 01:10:58,465 --> 01:11:01,809 Vice Chair Harvey: Could we have an evaluation 1008 01:11:01,809 --> 01:11:07,209 of possible solutions to the difficulty of the exit? 1009 01:11:11,175 --> 01:11:13,500 >> We could bring something back as a report. 1010 01:11:13,500 --> 01:11:14,305 This use is permitted. 1011 01:11:14,305 --> 01:11:16,897 It is a permitted grocery store. 1012 01:11:16,897 --> 01:11:20,761 The only change they want to make is a ten by eight 1013 01:11:20,761 --> 01:11:22,725 foot section to sell distilled spirits. 1014 01:11:22,725 --> 01:11:25,681 It should have zero impact on traffic or parking or anything 1015 01:11:25,681 --> 01:11:26,785 like that. 1016 01:11:26,785 --> 01:11:30,885 They are replacing -- if there are concerns with the selling 1017 01:11:30,885 --> 01:11:34,905 of distilled spirits whether it is signage hours of operation 1018 01:11:34,905 --> 01:11:35,585 etc. 1019 01:11:35,585 --> 01:11:38,500 Loitering, those are the types of items 1020 01:11:38,500 --> 01:11:43,405 we would from a planning perspective look to address. 1021 01:11:44,825 --> 01:11:49,250 The traffic although heard they are not 1022 01:11:49,615 --> 01:11:53,815 proposing the use of a store today. 1023 01:11:53,902 --> 01:11:56,650 So we're not looking at whether there's 1024 01:11:56,650 --> 01:11:59,118 adequate parking or there's adequate circulation. 1025 01:11:59,118 --> 01:12:01,118 That's already established. 1026 01:12:01,745 --> 01:12:07,315 So we could look at solutions or potential solutions related 1027 01:12:07,315 --> 01:12:11,385 to the sale of distilled spirits or the display of distilled 1028 01:12:11,385 --> 01:12:13,478 spirits or the signage that is associated 1029 01:12:13,478 --> 01:12:18,785 with distilled spirits or security whatever it may be. 1030 01:12:18,785 --> 01:12:22,451 Things that are related to specifically the sale. 1031 01:12:22,451 --> 01:12:26,291 That's what we should be focusing on. 1032 01:12:26,291 --> 01:12:30,725 And I think I've heard one of them 1033 01:12:30,725 --> 01:12:34,473 was the potential impact on the senior community that 1034 01:12:34,473 --> 01:12:37,865 lives in the adjacent apartments or connected 1035 01:12:37,865 --> 01:12:39,425 apartments I should say. 1036 01:12:39,425 --> 01:12:46,336 That's one item I don't know if there's a second specific item. 1037 01:12:46,336 --> 01:12:47,836 Commissioner Ireland: Specifically I 1038 01:12:47,836 --> 01:12:50,755 understand the parking and other issues are ancillary 1039 01:12:50,755 --> 01:12:54,529 and that's just going to come with running a market. 1040 01:12:54,529 --> 01:12:56,593 My specific concern is what level 1041 01:12:56,593 --> 01:12:59,178 of impact adding distilled spirits on the residence 1042 01:12:59,178 --> 01:13:00,751 is going to have. 1043 01:13:00,751 --> 01:13:02,730 I know we have this permitted and there's 1044 01:13:02,730 --> 01:13:04,105 a grocery store around the corner 1045 01:13:04,105 --> 01:13:05,953 and a gas station around the corner 1046 01:13:05,953 --> 01:13:09,665 so I do want us to be consistent but we 1047 01:13:09,665 --> 01:13:14,450 do need to properly balance property owner rights here 1048 01:13:14,450 --> 01:13:18,555 but I am especially nervous because this is a senior living 1049 01:13:18,555 --> 01:13:19,240 facility. 1050 01:13:19,240 --> 01:13:23,105 I think it's just a little bit different situation mixed use 1051 01:13:23,105 --> 01:13:25,105 is what it is and there will always be an impact 1052 01:13:25,105 --> 01:13:28,545 but I just want to understand what that's going to look like. 1053 01:13:28,545 --> 01:13:29,905 Thank you. 1054 01:13:29,905 --> 01:13:32,745 And I do want to thank the staff for preparing a very 1055 01:13:32,745 --> 01:13:35,550 thorough report and I apologize in some ways 1056 01:13:35,550 --> 01:13:37,217 but want to make sure at least to myself 1057 01:13:37,217 --> 01:13:42,170 that we are careful about this moving forward. 1058 01:13:43,257 --> 01:13:45,299 >> They are selling beer and wine no matter what. 1059 01:13:45,299 --> 01:13:48,899 That's just part of the supermarket. 1060 01:13:49,745 --> 01:13:56,345 So my main concern would just be if there is loitering. 1061 01:13:56,695 --> 01:14:00,371 I know the parking is a big issue 1062 01:14:00,371 --> 01:14:03,771 but if there's a diagram that shows how they would 1063 01:14:03,771 --> 01:14:07,371 be parking how that would work. 1064 01:14:09,281 --> 01:14:12,881 That might be a little more . 1065 01:14:19,823 --> 01:14:22,365 Commissioner Ireland: So I would ask for staff recommendation 1066 01:14:22,365 --> 01:14:22,865 and. 1067 01:14:22,865 --> 01:14:25,405 I know this meeting was in the middle of a month 1068 01:14:25,405 --> 01:14:27,305 normally at the first of the month. 1069 01:14:27,305 --> 01:14:31,865 I would assume that the first meeting in June is too quick. 1070 01:14:31,865 --> 01:14:34,185 Does that mean we need to look at this again 1071 01:14:34,185 --> 01:14:36,500 first week of July? 1072 01:14:36,500 --> 01:14:37,713 I want to be reasonable to the applicant. 1073 01:14:37,713 --> 01:14:39,945 I don't want to keep them hanging. 1074 01:14:39,945 --> 01:14:41,962 We are obviously okay but that's a lot 1075 01:14:41,962 --> 01:14:45,278 of work for staff in two weeks. 1076 01:14:45,278 --> 01:14:49,321 >> The meeting in June will be the third Tuesday. 1077 01:14:49,321 --> 01:14:54,219 However it is still a pretty quick turnaround of one month. 1078 01:14:54,219 --> 01:14:58,365 One of the positives about continuing to a date certain is 1079 01:14:58,365 --> 01:15:01,865 that the public hearing is continued so there is no re 1080 01:15:01,865 --> 01:15:07,585 noticing requirement so that can help staff a little bit with 1081 01:15:07,585 --> 01:15:09,585 processing time . 1082 01:15:11,110 --> 01:15:13,881 June 16th may be a pretty quick turnaround. 1083 01:15:13,881 --> 01:15:17,305 I would say either the June or July 1084 01:15:17,305 --> 01:15:22,105 meeting would be adequate times to continue this. 1085 01:15:23,305 --> 01:15:25,697 Commissioner Ireland: Is it feasible or reasonable 1086 01:15:25,697 --> 01:15:28,420 for us that it be added to the June agenda 1087 01:15:28,420 --> 01:15:32,242 and if not move it to July? 1088 01:15:32,345 --> 01:15:34,345 Take a moment. 1089 01:15:43,105 --> 01:15:48,258 Jose is requesting if we do continue to a date certain 1090 01:15:48,258 --> 01:15:52,458 and that would be the July meeting. 1091 01:15:53,225 --> 01:15:55,202 Commissioner Ireland: I would make a motion 1092 01:15:55,202 --> 01:15:58,625 to move this to July meeting and revise it 1093 01:15:58,625 --> 01:16:00,625 with staff recommendations. 1094 01:16:05,310 --> 01:16:11,310 >> I think we need to make that date specific correct? 1095 01:16:12,333 --> 01:16:16,533 Commissioner Ireland: July 7th for that motion. 1096 01:16:16,985 --> 01:16:20,250 Commissioner Goudie: I will second it. 1097 01:16:20,250 --> 01:16:25,425 Chair Price: We have a motion and a second. 1098 01:16:25,547 --> 01:16:27,547 Clerk please. 1099 01:16:27,728 --> 01:16:29,728 [Reading names] 1100 01:16:41,425 --> 01:16:43,425 Motion passes. 1101 01:16:45,650 --> 01:16:47,330 Chair Price: Thank you. 1102 01:16:47,330 --> 01:16:50,330 Moving to the regular calendar. 1103 01:16:50,165 --> 01:16:54,965 Do any commissioners have any questions for staff? 1104 01:17:02,118 --> 01:17:03,785 Commissioner Ireland: Talking about 5.1? 1105 01:17:03,785 --> 01:17:06,129 I did have a general question just 1106 01:17:06,129 --> 01:17:09,265 want to make sure that the Planning Commission is 1107 01:17:09,265 --> 01:17:13,685 confirming that this is in compliance with the General 1108 01:17:13,685 --> 01:17:14,225 Plan. 1109 01:17:14,225 --> 01:17:16,225 I apologize. 1110 01:17:23,159 --> 01:17:25,250 >> We do have a presentation. 1111 01:17:25,250 --> 01:17:29,825 Commissioner Ireland: I will save that for after. 1112 01:17:35,260 --> 01:17:38,205 >> Good evening chair price vice chair Harvey commissioners 1113 01:17:38,205 --> 01:17:40,473 and members of the public. 1114 01:17:40,473 --> 01:17:45,481 I'm the public works director city engineer for the City 1115 01:17:45,481 --> 01:17:46,905 of Oakley. 1116 01:17:46,905 --> 01:17:50,380 Tonight before you I am presenting the five year capital 1117 01:17:50,380 --> 01:17:53,185 Improvement program and the request tonight 1118 01:17:53,185 --> 01:17:55,809 would be to adopt the resolution finding 1119 01:17:55,809 --> 01:17:58,645 that the program that I'm presenting tonight 1120 01:17:58,645 --> 01:18:02,245 is consistent with our General Plan. 1121 01:18:04,945 --> 01:18:06,945 Next slide. 1122 01:18:07,410 --> 01:18:12,465 The public Works Department has had a very busy year 1123 01:18:12,465 --> 01:18:17,305 as you have seen and noticed there has been construction all 1124 01:18:17,305 --> 01:18:19,211 throughout our growing city of. 1125 01:18:19,211 --> 01:18:21,570 There are several projects as listed 1126 01:18:21,570 --> 01:18:23,745 in the report that have been completed 1127 01:18:23,745 --> 01:18:26,145 in fiscal year 2025 and 2026. 1128 01:18:26,670 --> 01:18:32,805 I will spare you all the details on all of them but just a few 1129 01:18:32,805 --> 01:18:37,605 to highlight was the Laurel road Widening project 1130 01:18:39,515 --> 01:18:43,115 that included repaving Ohara in coordination 1131 01:18:44,729 --> 01:18:50,129 with the Oakley Shops Development that has been opened 1132 01:18:50,731 --> 01:18:52,345 at that Northeast corner. 1133 01:18:52,345 --> 01:18:57,145 Some other notable projects I want to highlight 1134 01:18:57,145 --> 01:19:01,945 is the East Cypress Road widening just east 1135 01:19:02,969 --> 01:19:04,969 of Rubens Way. 1136 01:19:04,993 --> 01:19:09,793 This is a coordination effort with the developers 1137 01:19:10,505 --> 01:19:15,905 for the subdivision and that built the full infrastructure 1138 01:19:16,625 --> 01:19:21,409 for East Cypress Road in that segment with the median 1139 01:19:21,409 --> 01:19:24,409 and that has been completed. 1140 01:19:24,681 --> 01:19:28,313 And the two other notable projects I want to highlight 1141 01:19:28,313 --> 01:19:31,913 is adjacent projects on Sellars Avenue 1142 01:19:35,631 --> 01:19:39,745 and that was for the reconstruction for the pavement 1143 01:19:39,745 --> 01:19:44,998 for a full reclamation in coordination with the developer 1144 01:19:44,998 --> 01:19:50,105 also for that subdivision as they install sewer and water 1145 01:19:50,105 --> 01:19:52,105 utilities for Sellars. 1146 01:19:56,185 --> 01:20:01,585 As for current project highlights we have some -- 1147 01:20:01,985 --> 01:20:06,665 many projects that are currently in the process. 1148 01:20:06,665 --> 01:20:09,575 Just three of the ones that I'd like to highlight 1149 01:20:09,575 --> 01:20:16,175 is this project has been in our books for several years. 1150 01:20:17,329 --> 01:20:21,545 This is at the Northwest corner of Carpenter Road and Rose 1151 01:20:21,545 --> 01:20:22,109 Avenue. 1152 01:20:22,109 --> 01:20:27,367 If you haven't visited the site I highly suggest you do so. 1153 01:20:27,367 --> 01:20:31,465 You can start to see the magnitude 1154 01:20:31,465 --> 01:20:36,801 and the size of this park has several fun amenities. 1155 01:20:36,801 --> 01:20:42,225 This is a splash pad that will have several features 1156 01:20:42,225 --> 01:20:45,721 for the kids to play and enjoy during the summer months. 1157 01:20:45,721 --> 01:20:50,521 It also includes shade structures and two play 1158 01:20:52,105 --> 01:20:53,905 structures for the children and this 1159 01:20:53,905 --> 01:20:56,705 will be a great amenity to the neighborhood 1160 01:20:56,705 --> 01:20:59,121 and future residents for this area. 1161 01:20:59,121 --> 01:21:03,398 The second bullet item is all too familiar. 1162 01:21:03,398 --> 01:21:06,665 Our East Cypress Road widening project. 1163 01:21:06,665 --> 01:21:09,875 I think I have gained a few white hairs over the last years 1164 01:21:09,875 --> 01:21:11,585 building this project. 1165 01:21:11,585 --> 01:21:15,785 It's the three segment currently in construction 1166 01:21:18,250 --> 01:21:21,927 between the Avenue to Bethel Island Road. 1167 01:21:21,927 --> 01:21:26,737 The project is in the thick of it with construction as you see. 1168 01:21:26,737 --> 01:21:30,305 We hope to complete the full segment by summer 1169 01:21:30,305 --> 01:21:33,905 next year with the Canal Undergrounding 1170 01:21:34,545 --> 01:21:37,385 for the second phase progressing on the South Side 1171 01:21:37,385 --> 01:21:42,510 this summer so more large pipes coming into the site 1172 01:21:42,510 --> 01:21:44,240 to underground that canal. 1173 01:21:44,240 --> 01:21:47,445 The third bullet item here is our Oakley Library 1174 01:21:47,445 --> 01:21:48,873 and Community Center. 1175 01:21:48,873 --> 01:21:53,585 As you heard Jose present to us this evening 1176 01:21:53,585 --> 01:21:57,585 it's a beautiful library that is going to break ground here 1177 01:21:57,585 --> 01:22:02,233 in fall this year if all goes well with design 1178 01:22:02,233 --> 01:22:04,945 and getting all of the permits issued 1179 01:22:04,945 --> 01:22:10,949 that's another great amenity and a huge investment to our city. 1180 01:22:10,949 --> 01:22:15,149 Looking forward to see that project materialize 1181 01:22:15,625 --> 01:22:21,625 and take off right before my eyes in front of my office. 1182 01:22:21,625 --> 01:22:25,159 As for upcoming projects there are many. 1183 01:22:25,159 --> 01:22:28,425 As you see in the five year plan there's 1184 01:22:28,425 --> 01:22:30,265 over 43 projects in there. 1185 01:22:30,265 --> 01:22:33,329 Not all of them are funded for next fiscal year 1186 01:22:33,329 --> 01:22:36,971 but there are several projects, exciting projects 1187 01:22:36,971 --> 01:22:40,937 that are going to be progressing for next year. 1188 01:22:40,937 --> 01:22:46,937 The first few that I will talk about are -- 1189 01:22:48,250 --> 01:22:53,285 currently we are looking to advertise the resurfacing of two 1190 01:22:53,285 --> 01:22:56,985 large neighborhoods the Magnolia Park neighborhood and Teakwood 1191 01:22:56,985 --> 01:23:00,185 neighborhood and that's going to be happening in construction 1192 01:23:00,185 --> 01:23:01,765 this summer. 1193 01:23:01,765 --> 01:23:07,475 The second project on the slide is our annual maintenance 1194 01:23:07,475 --> 01:23:12,875 for our 50/50 program replacing sidewalk and curb and gutter. 1195 01:23:13,569 --> 01:23:20,769 The third -- this is an annual improvement to look at areas 1196 01:23:21,985 --> 01:23:27,825 where we can introduce speed bumps as part of our traffic 1197 01:23:27,825 --> 01:23:29,665 program for our city. 1198 01:23:29,665 --> 01:23:32,650 More annual maintenance projects. 1199 01:23:35,825 --> 01:23:41,225 This is our Ada program replacement project to replace 1200 01:23:43,333 --> 01:23:49,510 all of -- in our city that don't meet Ada standards. 1201 01:23:49,510 --> 01:23:52,510 Our signal modernization project which 1202 01:23:52,945 --> 01:23:56,409 continues to modernize our signals especially 1203 01:23:56,409 --> 01:24:02,106 some of the older ones we have in our city and the fiscal year 1204 01:24:02,106 --> 01:24:06,306 26 and 27 Street where repair and maintenance project. 1205 01:24:07,145 --> 01:24:11,170 The three segments of roadway we are focusing on 1206 01:24:11,170 --> 01:24:16,965 for designing this upcoming year is Laurel road as you enter 1207 01:24:16,965 --> 01:24:21,935 into our city come on the widest portion between the railroad 1208 01:24:21,935 --> 01:24:27,110 tracks there to Empire starting to look a little tired so we 1209 01:24:27,110 --> 01:24:30,601 are looking at the best way to improve that asset. 1210 01:24:30,601 --> 01:24:32,805 The second roadway we are looking at 1211 01:24:32,805 --> 01:24:37,605 is Main Street between Laurel and East Cypress. 1212 01:24:37,605 --> 01:24:40,605 That's another segment there starting 1213 01:24:41,100 --> 01:24:45,501 to have several base failures that will need to be addressed 1214 01:24:45,501 --> 01:24:48,730 and the third segment we are looking at 1215 01:24:48,730 --> 01:24:52,865 is Empire Avenue between Laurel to Main Street 1216 01:24:52,865 --> 01:24:58,625 and that is essentially the northern half of Empire North. 1217 01:24:58,625 --> 01:25:00,709 That's another segment we will be looking 1218 01:25:00,709 --> 01:25:03,709 to design this upcoming year. 1219 01:25:04,385 --> 01:25:07,985 Another exciting project we are looking 1220 01:25:08,537 --> 01:25:11,705 to finish design and start construction this summer 1221 01:25:11,705 --> 01:25:13,625 is CIP 343. 1222 01:25:13,625 --> 01:25:18,638 This is our City Hall remodel for the police department. 1223 01:25:18,638 --> 01:25:21,201 This project will remodel the reception area 1224 01:25:21,201 --> 01:25:25,945 in the front gamma expand the evidence and records office 1225 01:25:25,945 --> 01:25:30,505 spaces and create additional report writing office spaces 1226 01:25:30,505 --> 01:25:34,390 and construct a new conference in City 1227 01:25:34,390 --> 01:25:38,398 Hall with private doorways to secure the access to the police 1228 01:25:38,398 --> 01:25:38,931 Department. 1229 01:25:38,931 --> 01:25:42,577 This is consistent with the growing needs of our police 1230 01:25:42,577 --> 01:25:46,293 department as we continue to hire more officers to meet 1231 01:25:46,293 --> 01:25:49,293 the demands of our city. 1232 01:25:50,465 --> 01:25:55,265 Another exciting upcoming project this year is -- 1233 01:25:56,891 --> 01:26:04,691 this is an accessible pathway as you may know right now it has 1234 01:26:05,753 --> 01:26:12,393 a path surrounding the entire park that is not paved and this 1235 01:26:12,393 --> 01:26:19,321 project we are looking to pave that path and also improve some 1236 01:26:19,321 --> 01:26:27,721 ramps and access to the areas of the ball fields to allow for use 1237 01:26:32,777 --> 01:26:33,277 . 1238 01:26:33,277 --> 01:26:37,585 This project is a high priority from our city Council 1239 01:26:37,585 --> 01:26:39,145 when we did the budget retreat. 1240 01:26:39,145 --> 01:26:41,145 This is CIP 211. 1241 01:26:42,250 --> 01:26:44,855 This is Main Street and Rose Avenue intersection. 1242 01:26:44,855 --> 01:26:50,855 This is to signalize the current intersection and it serves 1243 01:26:50,945 --> 01:26:53,945 multiple districts such as Ironhorse , 1244 01:26:56,625 --> 01:27:00,790 East Bay regional parks and the water District to the north. 1245 01:27:00,790 --> 01:27:05,431 This intersection will be a four legged signal. 1246 01:27:05,431 --> 01:27:07,841 The design has been completed. 1247 01:27:07,841 --> 01:27:11,385 We are looking into advertise this project in the coming 1248 01:27:11,385 --> 01:27:14,985 months as council balances the budget 1249 01:27:15,993 --> 01:27:20,193 and we will begin construction this summer. 1250 01:27:20,425 --> 01:27:26,425 The other signal project I've been waiting for is CIP 268. 1251 01:27:28,650 --> 01:27:33,910 This is Main Street and Delta Road as many of you 1252 01:27:33,910 --> 01:27:36,705 have traveled that area it is very difficult to make 1253 01:27:36,705 --> 01:27:40,393 that left turn on Delta Road and becoming 1254 01:27:40,393 --> 01:27:43,281 difficult to make that right turn out of Delta Road. 1255 01:27:43,281 --> 01:27:46,545 This project also has been fully designed 1256 01:27:46,545 --> 01:27:49,905 and we are looking to also advertise this project 1257 01:27:49,905 --> 01:27:52,305 to construct this summer. 1258 01:27:52,630 --> 01:27:57,430 This also received high support from City Council. 1259 01:27:59,345 --> 01:28:04,145 This project is O'hara Avenue near Grapevine Lane. 1260 01:28:05,265 --> 01:28:10,665 This is a continuation of the improvements we've installed 1261 01:28:10,705 --> 01:28:13,105 of O'hara widening it. 1262 01:28:14,737 --> 01:28:19,450 This completes the gap between the Pheasant Meadow subdivision 1263 01:28:19,450 --> 01:28:25,450 that was recently constructed all the way to the north 1264 01:28:25,567 --> 01:28:28,567 where we ended the sidewalk. 1265 01:28:29,665 --> 01:28:33,265 This completes O'hara's four lane configuration 1266 01:28:34,175 --> 01:28:38,375 for a general plan for this segment 1267 01:28:40,145 --> 01:28:44,473 and will include bike lanes and a sidewalk. 1268 01:28:44,473 --> 01:28:49,577 This project is also designed and we are waiting for Council 1269 01:28:49,577 --> 01:28:52,865 to approve the budget to advertise this project 1270 01:28:52,865 --> 01:28:55,865 and begin construction this summer. 1271 01:28:57,665 --> 01:29:03,650 The next project is Main Street widening just north 1272 01:29:04,889 --> 01:29:06,281 of Laurel road. 1273 01:29:06,281 --> 01:29:12,650 This project is -- there's a gap in Main Street on the southbound 1274 01:29:12,650 --> 01:29:12,961 direction. 1275 01:29:12,961 --> 01:29:18,738 As you see there there are some trees and fences 1276 01:29:18,738 --> 01:29:21,409 that will need to be removed to widen 1277 01:29:21,409 --> 01:29:24,975 the roadway to its ultimate four lane configuration. 1278 01:29:24,975 --> 01:29:29,775 There will be some associated with this project 1279 01:29:31,185 --> 01:29:34,401 still in design not quite ready to go to construction yet 1280 01:29:34,401 --> 01:29:37,458 but we are hoping to move the project forward 1281 01:29:37,458 --> 01:29:41,971 in the coming year and when that is obtained 1282 01:29:41,971 --> 01:29:44,971 we will proceed with construction. 1283 01:29:48,250 --> 01:29:52,350 Last but not least is the most exciting project 1284 01:29:52,350 --> 01:29:55,985 that has been in the books for many decades. 1285 01:29:55,985 --> 01:30:01,385 This is the CIP 273 Laurel road extension between -- 1286 01:31:35,474 --> 01:31:37,474 [No Audio] 1287 01:32:01,931 --> 01:32:04,348 >> I do want to take a moment and say thank you especially 1288 01:32:04,348 --> 01:32:09,845 for getting across town the improvements here but the Delta 1289 01:32:09,845 --> 01:32:14,645 Street light potentially the Laurel expansion gamma Cypress 1290 01:32:14,881 --> 01:32:18,977 and as someone who lives out in that area these improvements are 1291 01:32:18,977 --> 01:32:19,753 -- 1292 01:32:19,753 --> 01:32:23,968 I just want to say thank you to you and your team 1293 01:32:23,968 --> 01:32:25,736 for making all this happen. 1294 01:32:25,736 --> 01:32:29,981 I know it is a ton of work. 1295 01:32:29,981 --> 01:32:31,398 >> Thank you Commissioner Ireland. 1296 01:32:31,398 --> 01:32:36,545 All the white hair is worth it hearing comments like that. 1297 01:32:36,545 --> 01:32:39,545 Chair Price: Any other questions? 1298 01:32:40,451 --> 01:32:41,585 >> Thank you. 1299 01:32:41,585 --> 01:32:45,650 Chair Price: Would someone like to make a resolution 1300 01:32:45,650 --> 01:32:47,650 to adopt this? 1301 01:32:48,650 --> 01:32:54,650 Commissioner Ireland: I will make a motion to approve it. 1302 01:32:57,427 --> 01:32:59,427 [Reading names] 1303 01:33:10,705 --> 01:33:12,705 Motion passes. 1304 01:33:18,959 --> 01:33:20,259 Chair Price: Thank you. 1305 01:33:20,259 --> 01:33:23,859 Moving to agenda item 6.1 staff reports. 1306 01:33:29,890 --> 01:33:31,939 >> Just a couple of items to provide information . 1307 01:33:31,939 --> 01:33:37,631 The first one is in two nights so on Thursday May 21st at 6 1308 01:33:37,631 --> 01:33:38,131 p.m. 1309 01:33:38,131 --> 01:33:39,845 Right here in the Council chambers 1310 01:33:39,845 --> 01:33:41,425 the Oakley Police Department will 1311 01:33:41,425 --> 01:33:43,825 be holding their military equipment report community 1312 01:33:43,825 --> 01:33:46,225 Meeting which is an annual report that the police 1313 01:33:46,225 --> 01:33:49,310 department does so if the public would like to attend 1314 01:33:49,310 --> 01:33:51,931 it will be right here on 6 p.m. 1315 01:33:51,931 --> 01:33:53,591 This upcoming Thursday. 1316 01:33:53,591 --> 01:33:57,465 Second announcement is the city will be holding the Memorial Day 1317 01:33:57,465 --> 01:34:02,705 ceremony on Saturday May 23rd and that will be approximately 1318 01:34:02,705 --> 01:34:03,333 from 10 a.m. 1319 01:34:03,333 --> 01:34:03,961 To 11 a.m. 1320 01:34:03,961 --> 01:34:07,625 Right here in the Civic Center Plaza and that is Saturday 1321 01:34:07,625 --> 01:34:11,429 the 23rd and then my final announcement we kind 1322 01:34:11,429 --> 01:34:14,505 of addressed earlier but the next Planning Commission meeting 1323 01:34:14,505 --> 01:34:18,465 is scheduled for June 16th and that is the regular date that 1324 01:34:18,465 --> 01:34:22,665 was approved when those 2026 dates were approved. 1325 01:34:22,915 --> 01:34:25,835 The commission has been paying attention 1326 01:34:25,835 --> 01:34:29,171 to when meetings fall on election days 1327 01:34:29,171 --> 01:34:32,409 so that people don't need to decide between going to vote 1328 01:34:32,409 --> 01:34:34,475 or coming to the Planning Commission meeting. 1329 01:34:34,475 --> 01:34:37,675 They went ahead and scheduled it for the third Tuesday of June 1330 01:34:37,675 --> 01:34:40,838 so June 16th will be the next Planning Commission meeting. 1331 01:34:40,838 --> 01:34:43,500 That concludes all of my reports. 1332 01:34:43,500 --> 01:34:45,500 Thank you. 1333 01:34:49,829 --> 01:34:53,429 Chair Price: Any reports from commissioners? 1334 01:34:53,705 --> 01:34:56,585 Commissioner Oliveros: Just to save the date for October 21st 1335 01:34:56,585 --> 01:35:00,705 doing our first Oakley Business forum partnering in this space 1336 01:35:00,705 --> 01:35:05,145 to help all of our local businesses really thrive. 1337 01:35:05,145 --> 01:35:09,358 We've been doing business analysis and surveys serving 1338 01:35:09,358 --> 01:35:12,785 a lot of the small businesses here in Oakley just 1339 01:35:12,785 --> 01:35:16,305 to get a feel for what support they need so we are really 1340 01:35:16,305 --> 01:35:19,205 excited to bring a one of a kind forum 1341 01:35:19,205 --> 01:35:22,557 that we are going to set ourselves apart 1342 01:35:22,557 --> 01:35:27,718 from our neighboring cities so I would love if you're 1343 01:35:27,718 --> 01:35:30,985 able to fill out the survey if you do own a business 1344 01:35:30,985 --> 01:35:34,962 or know of someone who owns a business here in Oakley that 1345 01:35:34,962 --> 01:35:38,250 is in our Chamber of Commerce website 1346 01:35:38,250 --> 01:35:43,385 and hopefully we get a good group of folks coming out. 1347 01:35:43,385 --> 01:35:45,170 Chair Price: Thank you. 1348 01:35:45,170 --> 01:35:47,170 Any other reports? 1349 01:35:48,425 --> 01:35:53,225 Request for future agenda items from the commissioners? 1350 01:35:58,825 --> 01:36:01,225 Now moving to item 7.1. 1351 01:36:25,420 --> 01:36:26,545 >> Thank you commissioners. 1352 01:36:26,545 --> 01:36:29,865 Tonight we have a work session on objective design standards. 1353 01:36:29,865 --> 01:36:32,945 First we will start with some background. 1354 01:36:32,945 --> 01:36:36,545 Design guidelines are the city's adopting 1355 01:36:38,337 --> 01:36:40,635 a direction for what quality development should 1356 01:36:40,635 --> 01:36:41,931 look like in Oakley. 1357 01:36:41,931 --> 01:36:44,521 They apply to all types of development 1358 01:36:44,521 --> 01:36:47,650 from a single family residential development 1359 01:36:47,650 --> 01:36:49,465 a multifamily residential development 1360 01:36:49,598 --> 01:36:51,998 a commercial development, industrial. 1361 01:36:52,375 --> 01:36:54,945 Tonight will be exclusively talking 1362 01:36:54,945 --> 01:36:56,945 about residential development. 1363 01:36:58,985 --> 01:37:03,731 These standards can cover the amount of open space 1364 01:37:03,731 --> 01:37:08,485 in a development's design com a small architectural aspect 1365 01:37:08,485 --> 01:37:12,651 such as window trim to more impactful standards 1366 01:37:12,651 --> 01:37:14,185 around building massing. 1367 01:37:14,185 --> 01:37:17,905 They really cover a wide range of architectural aspects 1368 01:37:17,905 --> 01:37:22,105 and design aspects of a housing project. 1369 01:37:22,365 --> 01:37:26,645 We hope decision makers applicants and the public 1370 01:37:26,645 --> 01:37:30,175 evaluate whether a project fits the community's character 1371 01:37:30,175 --> 01:37:34,145 and expectations for site planning building design 1372 01:37:34,145 --> 01:37:36,545 landscaping streetscape and compatibility. 1373 01:37:41,425 --> 01:37:46,115 Over the last decade come a the California Legislature 1374 01:37:46,115 --> 01:37:50,545 has passed a series of laws intended to streamline housing 1375 01:37:50,545 --> 01:37:53,717 production by requiring certain types of projects 1376 01:37:53,717 --> 01:37:57,917 to be reviewed solely against objective standards. 1377 01:37:57,945 --> 01:38:02,250 At the same time as that cities have been required 1378 01:38:02,250 --> 01:38:05,250 to zone for additional housing. 1379 01:38:06,305 --> 01:38:12,305 This has pushed cities to adopt more objective design standards. 1380 01:38:13,105 --> 01:38:16,105 Let's cover what odds are. 1381 01:38:18,145 --> 01:38:20,465 Objective design standards are design requirements 1382 01:38:20,465 --> 01:38:24,265 that are clear measurable knowable in advance 1383 01:38:24,265 --> 01:38:28,225 and applied in the same way to all qualifying projects. 1384 01:38:28,225 --> 01:38:30,225 Here's an example. 1385 01:38:30,865 --> 01:38:35,273 An example here is instead of saying the building should 1386 01:38:35,273 --> 01:38:37,118 be compatible with the neighborhood, 1387 01:38:37,118 --> 01:38:41,345 an objective standard might say primary building entries should 1388 01:38:41,345 --> 01:38:45,105 face the public street or publicly accessible walkway. 1389 01:38:45,105 --> 01:38:47,545 That way the developer and the builder 1390 01:38:47,545 --> 01:38:50,418 knows a little bit more what we are 1391 01:38:50,418 --> 01:38:52,617 looking for while they are designing it 1392 01:38:52,617 --> 01:38:57,318 before they get to our review and then on to a public hearing. 1393 01:38:57,318 --> 01:39:00,425 The goal is not to remove good design. 1394 01:39:00,425 --> 01:39:03,195 The goal is to define what good design means 1395 01:39:03,195 --> 01:39:06,745 in measurable enforceable terms that applicant staff decision 1396 01:39:06,745 --> 01:39:10,411 makers and the public can all understand before an application 1397 01:39:10,411 --> 01:39:11,865 is submitted. 1398 01:39:11,865 --> 01:39:16,650 In Oakley we have two illustrated manuals 1399 01:39:16,565 --> 01:39:19,565 that have residential design guidelines. 1400 01:39:19,758 --> 01:39:22,641 We have the 2003 Residential Design guidelines 1401 01:39:22,641 --> 01:39:25,691 and then we have the downtown specific plan. 1402 01:39:25,691 --> 01:39:29,331 They have a mix of subjective standards 1403 01:39:29,331 --> 01:39:34,281 and objective standards and in the downtown it's more modern 1404 01:39:34,281 --> 01:39:36,218 and it has more objective standards. 1405 01:39:36,218 --> 01:39:40,305 We feel that it has sufficient objective standards 1406 01:39:40,305 --> 01:39:44,225 that it does not need to be modified but the 2003 1407 01:39:44,225 --> 01:39:47,129 Residential design guidelines are a little bit more subjective 1408 01:39:47,129 --> 01:39:50,841 and so we are looking to update those. 1409 01:39:50,841 --> 01:39:55,385 With this project we are talking about tonight. 1410 01:39:55,385 --> 01:40:00,238 As Oakley continues to grow come a new housing 1411 01:40:00,238 --> 01:40:04,545 may be proposed whether we have these standards in place or not. 1412 01:40:04,545 --> 01:40:06,339 Objective design standards give us 1413 01:40:06,339 --> 01:40:09,191 the tools to make sure that new housing fits in 1414 01:40:09,191 --> 01:40:12,170 with our community and is nice to live in. 1415 01:40:12,170 --> 01:40:16,217 Projects are well evaluated to our standards, 1416 01:40:16,425 --> 01:40:20,250 housing is reviewed efficiently and consistently 1417 01:40:20,225 --> 01:40:24,900 and we meet the requirements of state law. 1418 01:40:24,900 --> 01:40:26,405 Without adopted objective standards 1419 01:40:26,405 --> 01:40:28,585 the city has limited ability to shape 1420 01:40:28,585 --> 01:40:30,430 the design of housing projects that 1421 01:40:30,430 --> 01:40:32,275 qualify for streamlined review. 1422 01:40:32,275 --> 01:40:35,351 These standards are how we ensure housing construction is 1423 01:40:35,351 --> 01:40:38,859 aligned with our goals and values 1424 01:40:38,859 --> 01:40:42,459 while still welcoming new Oakley residents. 1425 01:40:43,625 --> 01:40:47,678 We have some areas of focus we want your feedback on in. 1426 01:40:47,678 --> 01:40:50,730 We want to see if we're on the right track. 1427 01:40:50,730 --> 01:40:53,305 While we provide some draft guidelines to you 1428 01:40:53,305 --> 01:40:55,450 we are not expecting you to provide us 1429 01:40:55,450 --> 01:40:57,445 with specific details on each of the guidelines. 1430 01:40:57,445 --> 01:41:00,487 Rather staff would like to know what 1431 01:41:00,487 --> 01:41:02,417 areas of the guidelines we should focus 1432 01:41:02,417 --> 01:41:06,345 on and for you to provide us any significant topics you 1433 01:41:06,345 --> 01:41:09,945 may feel we may be missing. 1434 01:41:13,465 --> 01:41:18,265 The first one we have is public Safety. 1435 01:41:18,495 --> 01:41:22,545 This one took a little bit of explaining to my colleagues 1436 01:41:22,545 --> 01:41:25,361 because we already extensively reviewed Public Safety. 1437 01:41:25,361 --> 01:41:27,676 It's a huge priority for us. 1438 01:41:27,676 --> 01:41:29,825 When we get a project in it doesn't 1439 01:41:29,825 --> 01:41:31,415 matter that the design guidelines 1440 01:41:31,415 --> 01:41:33,833 don't tell us to do this. 1441 01:41:33,833 --> 01:41:36,249 We routed out to these agencies. 1442 01:41:36,249 --> 01:41:39,393 The fire department the police department 1443 01:41:39,393 --> 01:41:44,193 and we require that projects incorporate their comments 1444 01:41:45,865 --> 01:41:49,225 and so anyone who is familiar with reviewing 1445 01:41:49,225 --> 01:41:53,659 housing projects will turn their head at this do we need this? 1446 01:41:53,659 --> 01:41:57,385 We have staff and our team who have been in public hearings 1447 01:41:57,385 --> 01:42:01,193 for these streamlined projects and the public 1448 01:42:01,193 --> 01:42:03,497 wants it explicitly said. 1449 01:42:03,497 --> 01:42:06,361 When it comes time for public comment 1450 01:42:06,361 --> 01:42:08,177 on these streamlined housing projects 1451 01:42:08,177 --> 01:42:11,425 come a public safety comes up and they don't just 1452 01:42:11,425 --> 01:42:16,825 want to hear from staff that it was routed. 1453 01:42:19,745 --> 01:42:22,716 The other instigator of this is when 1454 01:42:22,716 --> 01:42:25,365 we are at the permit counter and we 1455 01:42:25,365 --> 01:42:28,115 have someone who wants to build a housing development. 1456 01:42:28,115 --> 01:42:30,425 We will slide over our guidelines 1457 01:42:30,425 --> 01:42:32,585 and they start thinking about their project 1458 01:42:32,585 --> 01:42:34,510 from that perspective. 1459 01:42:34,510 --> 01:42:35,945 I would like them to think about it 1460 01:42:35,945 --> 01:42:40,193 from the early pages about public safety evacuation routes 1461 01:42:40,193 --> 01:42:42,145 things of that nature so when they 1462 01:42:42,145 --> 01:42:48,745 go to their architect that's the first thing on their mind. 1463 01:42:49,225 --> 01:42:51,593 Next is site design. 1464 01:42:51,593 --> 01:42:54,700 Another area of focus for us. 1465 01:42:54,700 --> 01:42:56,918 We want new housing to be a nice place to live. 1466 01:42:56,918 --> 01:43:01,545 We want good site design open space pedestrian pathways 1467 01:43:01,545 --> 01:43:05,170 and connections to ways of getting around. 1468 01:43:05,170 --> 01:43:07,417 That's important to us. 1469 01:43:10,105 --> 01:43:13,485 We are also looking at the building envelope. 1470 01:43:13,485 --> 01:43:16,465 Rather than being overly prescriptive 1471 01:43:16,465 --> 01:43:19,305 about every aspect of design planning staff 1472 01:43:19,305 --> 01:43:22,945 are focused on ensuring that building envelopes are 1473 01:43:22,945 --> 01:43:25,905 appropriate within the surrounding area 1474 01:43:25,905 --> 01:43:29,505 that they do not dominate the surrounding landscape where 1475 01:43:29,505 --> 01:43:32,405 possible and that they are sensitive to nearby existing 1476 01:43:32,405 --> 01:43:32,905 homes. 1477 01:43:32,905 --> 01:43:35,617 An example of that is many cities 1478 01:43:35,617 --> 01:43:37,765 are stepping back their top floors 1479 01:43:37,765 --> 01:43:41,617 when they are close to shorter residential buildings 1480 01:43:41,617 --> 01:43:44,617 like in this example here. 1481 01:43:47,185 --> 01:43:50,785 For us that's more important than making sure 1482 01:43:50,785 --> 01:43:53,745 we have a certain percentage of glazing 1483 01:43:53,745 --> 01:43:59,745 or so many feet of some type of architectural feature. 1484 01:44:00,145 --> 01:44:03,545 When we talk about the smaller design aspects 1485 01:44:03,545 --> 01:44:06,842 we want buildings that look good and hold up over time 1486 01:44:06,842 --> 01:44:09,945 but our standards need to be realistic about cost. 1487 01:44:09,945 --> 01:44:13,878 If design requirements push project costs to high housing 1488 01:44:13,878 --> 01:44:16,817 does not get built and that does not help anyone. 1489 01:44:16,817 --> 01:44:21,385 We want to require articulation and facade variation 1490 01:44:21,385 --> 01:44:27,385 without dictating every inch of every cornice or glazing area. 1491 01:44:27,557 --> 01:44:30,431 We want to focus on the elements that matter 1492 01:44:30,431 --> 01:44:32,553 and how a building looks and feels 1493 01:44:32,553 --> 01:44:36,753 from the street or other common areas. 1494 01:44:36,865 --> 01:44:41,650 Another focus of ours is community feedback. 1495 01:44:41,505 --> 01:44:44,598 At our public outreach meeting residents 1496 01:44:44,598 --> 01:44:47,705 shared priorities that are shaping our approach. 1497 01:44:47,705 --> 01:44:50,535 We heard that we should build communities not just 1498 01:44:50,535 --> 01:44:53,569 housing gamma people want neighborhoods with shared spaces 1499 01:44:53,569 --> 01:44:55,485 not just rows of buildings. 1500 01:44:55,485 --> 01:44:59,605 We heard design should encourage interaction between neighbors. 1501 01:44:59,605 --> 01:45:03,585 We also heard we should allow creative freedom for architects 1502 01:45:03,585 --> 01:45:08,625 standards should set a floor not a ceiling prescriptive rules 1503 01:45:08,625 --> 01:45:12,281 that force every project to look the same going 1504 01:45:12,281 --> 01:45:13,549 against good design. 1505 01:45:13,549 --> 01:45:17,145 We are writing clear minimums while leaving room 1506 01:45:17,145 --> 01:45:21,945 for architects to bring creative high quality solutions. 1507 01:45:22,265 --> 01:45:26,611 In Oakley as far as I remember we 1508 01:45:26,611 --> 01:45:31,185 have had a philosophy of not focusing on the most 1509 01:45:31,185 --> 01:45:33,265 difficult parts of a project. 1510 01:45:33,265 --> 01:45:35,385 We want to dive head first into that work 1511 01:45:35,385 --> 01:45:37,545 so the most fleshed out parts of this project 1512 01:45:37,545 --> 01:45:39,955 are these nitty gritty standards for how 1513 01:45:39,955 --> 01:45:42,171 the architectural details should be designed 1514 01:45:42,171 --> 01:45:44,615 and how the site should be designed. 1515 01:45:44,615 --> 01:45:46,445 We've attached two draft chapters 1516 01:45:46,445 --> 01:45:50,345 for you attached to the staff report. 1517 01:45:50,345 --> 01:45:53,945 Attachment one covers multifamily and mixed 1518 01:45:55,355 --> 01:45:59,425 use residential standards including site design street 1519 01:45:59,425 --> 01:46:03,625 connectivity pedestrian pathways vehicle access parking lot 1520 01:46:04,158 --> 01:46:09,558 screening utilities and service areas and primary entry design. 1521 01:46:15,145 --> 01:46:19,345 Attachment two covers single family residential standards 1522 01:46:20,305 --> 01:46:24,505 including building form and massing facade projections 1523 01:46:24,865 --> 01:46:29,250 second floor setbacks story separation facade materials 1524 01:46:29,250 --> 01:46:31,425 and covered porch design. 1525 01:46:37,825 --> 01:46:40,618 Another aspect we need to talk about 1526 01:46:40,618 --> 01:46:42,475 is when we get really technical. 1527 01:46:42,475 --> 01:46:45,193 Each day Oakley's planning team is 1528 01:46:45,193 --> 01:46:47,535 working to make construction and land use more 1529 01:46:47,535 --> 01:46:49,535 accessible for residents. 1530 01:46:49,785 --> 01:46:52,545 We usually roll our eyes when we see folks in our profession 1531 01:46:52,545 --> 01:46:54,730 make things overly complicated. 1532 01:46:54,730 --> 01:46:57,865 We are asking for your support and patience 1533 01:46:57,865 --> 01:47:00,613 on some aspects of this project that we feel 1534 01:47:00,613 --> 01:47:02,945 need to get into the weeds. 1535 01:47:02,945 --> 01:47:05,849 For example urban planning has started 1536 01:47:05,849 --> 01:47:10,585 using the term which is just a large walkway for residents 1537 01:47:10,585 --> 01:47:13,633 that connects folks to areas of a housing complex. 1538 01:47:13,633 --> 01:47:16,825 We saw that used in the library project 1539 01:47:16,825 --> 01:47:21,161 today which was a good win that was mentioned in the first item. 1540 01:47:21,161 --> 01:47:25,625 During the years of living in Oakley and going to school here 1541 01:47:25,625 --> 01:47:28,602 we never use this term but as a planner in 2026 1542 01:47:28,602 --> 01:47:31,177 I am finding it a good way to communicate 1543 01:47:31,177 --> 01:47:33,465 what we need in a project. 1544 01:47:33,465 --> 01:47:36,613 Additionally there's a state law that 1545 01:47:36,613 --> 01:47:42,613 only allows us to use pre 2018 subjective standards to review 1546 01:47:43,257 --> 01:47:44,809 some projects. 1547 01:47:44,809 --> 01:47:47,865 So you will likely see us carry over those standards 1548 01:47:47,865 --> 01:47:49,635 and that can be confusing. 1549 01:47:49,635 --> 01:47:52,165 We will make sure to explain that. 1550 01:47:52,165 --> 01:47:55,198 We hate to have to get technical in that way. 1551 01:47:55,198 --> 01:47:57,811 We just want it clear and simple in order 1552 01:47:57,811 --> 01:48:03,145 to get us the projects we want we will likely implement that. 1553 01:48:03,145 --> 01:48:06,745 Those are our areas of focus. 1554 01:48:06,865 --> 01:48:08,665 Let's go over the next steps. 1555 01:48:08,665 --> 01:48:13,665 Tonight we are seeking your feedback on our overall focus 1556 01:48:13,665 --> 01:48:14,457 and direction. 1557 01:48:14,457 --> 01:48:16,929 We'd love to hear your thoughts. 1558 01:48:16,929 --> 01:48:20,497 We will then do the same with the City Council in July. 1559 01:48:20,497 --> 01:48:22,790 We will complete a draft of the regulations 1560 01:48:22,790 --> 01:48:25,501 and provide those to you later this year 1561 01:48:25,501 --> 01:48:27,941 for review and potential recommendation to the City 1562 01:48:27,941 --> 01:48:28,441 Council. 1563 01:48:28,441 --> 01:48:31,654 We will then seek City Council approval. 1564 01:48:31,654 --> 01:48:35,250 While we do want to strengthen our guidelines quickly and get 1565 01:48:35,250 --> 01:48:38,465 quality regulations on the books we are not great artists 1566 01:48:38,465 --> 01:48:40,605 and will likely seek a consultant 1567 01:48:40,605 --> 01:48:44,425 to develop an illustrated manual after we get it approved. 1568 01:48:44,425 --> 01:48:46,735 Thanks for your time commissioners. 1569 01:48:46,735 --> 01:48:50,335 We welcome your questions and feedback. 1570 01:48:55,233 --> 01:48:57,250 Vice Chair Harvey: Thank you for the report 1571 01:48:57,250 --> 01:48:59,425 that was very informative. 1572 01:49:00,770 --> 01:49:01,785 Commissioner Oliveros: The architect part 1573 01:49:01,785 --> 01:49:03,665 where you mentioned giving architects 1574 01:49:03,665 --> 01:49:07,137 free autonomy to design I thought that was amazing. 1575 01:49:07,137 --> 01:49:11,691 So does this mean that is it the architects 1576 01:49:11,691 --> 01:49:13,575 that the city works with or the architects 1577 01:49:13,575 --> 01:49:16,575 that the builders work with? 1578 01:49:17,250 --> 01:49:18,198 >> That's a great question. 1579 01:49:18,198 --> 01:49:20,531 It's the architects that the builders work with and just 1580 01:49:20,531 --> 01:49:25,445 to give you some details on that we only had a few folks come 1581 01:49:25,445 --> 01:49:27,130 to our outreach meeting. 1582 01:49:27,130 --> 01:49:32,838 One of them was an architect who happens to live in town 1583 01:49:32,838 --> 01:49:36,345 and people are making the case that we always 1584 01:49:36,345 --> 01:49:38,965 require multiple materials on the front facade 1585 01:49:38,965 --> 01:49:44,425 and what if you did a farmhouse on a large portion of it. 1586 01:49:44,425 --> 01:49:46,868 That should be sufficient and it was a good argument 1587 01:49:46,868 --> 01:49:50,468 so we are thinking on that. 1588 01:49:51,145 --> 01:49:53,545 Commissioner Oliveros: That's great. 1589 01:49:54,553 --> 01:49:58,753 It's an attraction for bringing new families 1590 01:49:59,617 --> 01:50:05,617 and I love that term so thank you for that. 1591 01:50:14,256 --> 01:50:16,890 Commissioner Ireland: I do want to emphasize 1592 01:50:16,890 --> 01:50:18,172 that leaving some creative freedom is a good thing 1593 01:50:18,172 --> 01:50:20,450 and we need to balance that with our need 1594 01:50:20,450 --> 01:50:24,201 to create a robust set of design standards 1595 01:50:24,201 --> 01:50:26,505 and just as a general comment I fully 1596 01:50:26,505 --> 01:50:29,405 support getting as technical as you need 1597 01:50:29,405 --> 01:50:34,573 to to have specific criteria identified so there is no wiggle 1598 01:50:34,573 --> 01:50:37,735 room and language especially if language among design 1599 01:50:37,735 --> 01:50:38,953 is evolving. 1600 01:50:38,953 --> 01:50:41,953 New word for me tonight. 1601 01:50:42,395 --> 01:50:46,165 So I'm not sure if you're looking for a feedback 1602 01:50:46,165 --> 01:50:49,247 but there were a few things I had questions on that 1603 01:50:49,247 --> 01:50:52,737 if it's not going to cause too many issues just to consider. 1604 01:50:52,737 --> 01:50:55,225 We talked about public safety. 1605 01:50:55,225 --> 01:50:58,642 That was one of them but how we can ensure that fire codes are 1606 01:50:58,642 --> 01:51:02,425 up to date and also site access specifically things 1607 01:51:02,425 --> 01:51:04,558 like access of fire trucks. 1608 01:51:04,558 --> 01:51:06,617 We talk a lot about evacuation but just 1609 01:51:06,617 --> 01:51:11,601 ensuring we have access for police or regular vehicles. 1610 01:51:11,601 --> 01:51:15,451 There's a few other items when I looked 1611 01:51:15,451 --> 01:51:17,265 over the preliminary working drafts 1612 01:51:17,265 --> 01:51:19,625 and I may have missed it because I 1613 01:51:19,625 --> 01:51:22,225 am somewhat new to all of this but things like density 1614 01:51:22,225 --> 01:51:24,225 requirements, coverage limits. 1615 01:51:26,785 --> 01:51:35,185 One item I did not see in there and I know we are -- 1616 01:51:35,273 --> 01:51:39,313 light standards for how exterior lighting is done as well as tree 1617 01:51:39,313 --> 01:51:43,425 planting ratios so we can make sure we still have a proper 1618 01:51:43,425 --> 01:51:45,968 landscaping so the intent of my comments is I don't want 1619 01:51:45,968 --> 01:51:48,385 to create an environment where we're not allowing for that 1620 01:51:48,385 --> 01:51:52,498 creative freedom we talked about but we do need some kind 1621 01:51:52,498 --> 01:51:55,521 of objective design standards especially given how planning is 1622 01:51:55,521 --> 01:51:59,401 changing in the state and I want to say thank you for being 1623 01:51:59,401 --> 01:52:03,158 proactive and the whole team for addressing this issue. 1624 01:52:03,158 --> 01:52:06,265 >> Thank you Commissioner and that's very helpful feedback 1625 01:52:06,265 --> 01:52:10,585 because I can either add it to the drafts or if we have it 1626 01:52:10,585 --> 01:52:13,885 somewhere else when I bring you the drafts I can tell you where 1627 01:52:13,885 --> 01:52:15,185 that is so that's very helpful. 1628 01:52:15,185 --> 01:52:17,185 Thank you.