[0:00] Commission meeting on August 25th, 2026. To order at 1232. [0:10] I'm gonna have a roll call, please. Commissioner Garcia. Here. [0:15] Commissioner McIntosh. Here. Commissioner Sanchez. Pierre. Commissioner Buchsik? Here. Vice [0:22] Chair Gregory. Here. Chair Blakely. Here. We have a quorum. [0:26] Thank you. At this time, it's been set aside for [0:31] the public to address the architecture review commission on issues [0:34] that are not on the agenda for up to three [0:37] minutes because the Brown Act does not allow the Commission [0:39] to act on items not listed on the agenda. Members [0:43] may briefly respond or refer the matter to staff. A [0:47] report and recommendation that a future meeting. For the recording, [0:52] Secretary, please instruct. For those joining by Zoom, if you'd [0:57] like to provide non - agenda public comment, please use [0:59] the raise hand function at the bottom of your screen. [1:01] If you're joining by a phone, you can press star [1:04] 9 to add yourself to the queue. If there was [1:08] to speak on the agenda, but it's not on the [1:09] agenda, please raise your hand to speak. I see none. [1:17] Consent, excuse me, consent calendar all matters listed on the [1:20] consent calendar are considered routine and maybe approved by one [1:23] motion. The public may comment on any item on the [1:26] consent calendar within the three - minute time limit individual [1:30] items may be removed by the architecture review commission for [1:33] a separate meeting. Is there any commissioner who would like [1:36] to make a motion. Chair, if I may, that's for [1:44] item 4A, the approval of the minutes for July 28th. [1:48] And August 11. Mr. Itemprove for The Minutes of July [1:54] 28th and August 27, okay. Business items. Consideration. We still [2:00] need a motion in a second. Oh, motion in a [2:02] second. I motion to approve. Second. Motion by Gregory, second [2:06] by Vhuksev, all in favor, please say aye. Aye. Any [2:11] opposed. Motion carry 60. Thank you guys. Can this is [2:17] a reaching of a design review for the innovation of [2:19] an existing building at 72, 700 Fred wearing. Converting the [2:25] former church building into a medical office building. Can I [2:29] have a staff report. Yes. [2:48] Good afternoon, sharing commissioners. My name is Peyton Thomas, an [2:52] associate planner in the development services department. And today I'll [2:55] be presenting on permit number DR - 26009. The DIG [3:02] LLC Medical Center off 72700 Fred wearing drive. The project [3:12] applicant is Reuben Coronado. The project location is 72700 Fredware [3:18] in Drive. And the request is the design review approval [3:21] for a proposed facade modification. To an existing building for [3:25] DIG LLC Medical Center. Their project includes modification to the [3:29] architecture, landscape, hardscape, and lighting, and increasing the square footage [3:34] from 7, 469 square feet to 9, 325 square feet. [3:44] Years of vicinity mapped show the area of the project [3:47] site. This is the north side of Fred Waring and [3:51] it's to the west of Fairhaven Drive. Across from Trader [3:57] Joe's. Now here we just have the east and west [4:03] elevations of the proposed project. This is to show the [4:07] sloping of the roof. As you can see, the highest [4:09] point is on the south elevation at 28 feet. The [4:16] northernmost point is at 15 feet height. And here we [4:26] have the, um, other elevations, the north and south ignore [4:30] the title, please. Um, here we could see the standing [4:35] seams as well as the, um, simplification of the North [4:41] elevation to just double doors. So here we have the [4:48] existing South elevation. This is the current condition. And then [4:55] here we have the proposed South elevation. As you can [4:58] see, um, the existing recession of the existing conditions have [5:04] been infilled. And that is partially of how the square [5:08] footage is being added. As well as, um, addition of [5:12] second story is added as well. So most of the [5:14] square footage edition is actually just infill of two pop [5:19] belts, one on the west side and one on the [5:21] east, as well as infillion entryways on the east elevation. [5:27] And then as we could see on the south elevation, [5:29] that infill would be the standing seam. Here we have [5:36] the existing east elevation. Again, you could see how it [5:40] is recessed currently with the pop out as well as [5:44] in the doorways. Then we have the proposed East elevation. [5:57] And then we have the existing West elevation. Here I [6:00] included multiple photos, um, to show the existing condition as [6:05] well as where the mechanical equipment exists currently and where [6:09] it's going to be proposed as well. It's going to [6:11] be on the side of the West elevation of the [6:14] building. And here we have the proposed West Elevation rendering. [6:25] And then here I included this rendering to show the [6:29] overall image and also include the roof plan. That just [6:35] a little bit more clear for presentation purposes just to [6:38] show that there is no mechanical equipment on the sloped [6:40] roof. For proposed landscaping, this shows [6:51] the scope limit as well as some of the plants [6:54] included in the landscaping, which includes the line of ficus [6:58] along the west elevation. Which is also included with, there [7:02] will be a wall as well for screening, but screening [7:05] the mechanical equipment. As well as inclusion of polo verdes, [7:11] brittle bush, slipper plants, and other various plants like aloe [7:16] vero, with, uh, decomposed granite DG. And we have decorative [7:23] pavers going into the building on the East elevation. Now [7:31] staff of determined that the findings have been met and [7:33] recommend the project for approval. If design comments arise during [7:37] the discussion, staff recommends the ARC outline the request of [7:40] changes and incorporate the commons as conditions of approval. That [7:44] concludes my presentation. Thank you. Are there any [7:54] questions from staff for the commission. There's the applicant have [8:01] any questions. Thought that was, um. Presentation. Is African. [8:11] Question. To make sure I understand. I didn't see any [8:19] demo plans. I want to make sure I understand exactly [8:23] what I'm looking at. Um. So I understand that the [8:27] pop - outs on the east and west that are [8:29] being filled in, I think. Yes. And then on, on [8:32] the south end, um, I'm looking at, right now I'm [8:37] looking at A sheet A201. I'm sorry, the north end, [8:43] the north end. So it's the low end. And the. [8:50] Um, the thing at the, at the north end that's [8:54] kind of popping up above the sloped groove. Is that [8:58] existing or is that, is that been altered by the [9:02] applicant. Are you describing the kind of column feature that's [9:08] on the southern elevation that's peeking out on the elevation? [9:13] No, I'm, I'm referring to the north end of the [9:15] building at the low, low end of the roof. There's [9:19] a piece that pops up above the sloped roof. Kind [9:26] of a boxy. Oh, yes, the paraffin. Yeah. What is [9:30] that added. Um, based off what I saw that parapet [9:35] was already existing. You're saying that three feet parapit on [9:41] the end. How slopes all the way down and then [9:44] it picks back up at that last. Well, it's flat [9:49] on the top. The thing I'm looking at, I'm looking [9:51] at the west exterior elevation on sheet eight, 201. And [9:55] I'm looking at the right end of it. Okay. Yes. [10:05] And what you're describing is that end the northernmost piece [10:09] that has the three foot parapit. I guess it's a [10:13] three foot pair pit. Okay. Yes. Kind of jogs up. [10:19] Yeah. Bottom left corner. Okay. Okay. You can look at [10:23] the bottom left or the upper right. Yeah. It's the [10:26] same form. And is that existing. The parapet now. Yeah. [10:32] Okay. We'll leave that one for the apple. Yeah. Okay. [10:36] Based off of existing conditions from the aerial you could [10:39] see a little bit of change, but he'll describe more [10:42] about the paradigm. We'll leave that for the applicant. Another [10:50] questions. Okay. I have a question. This being check against [10:55] historical preservation ordinance. [11:06] Let me get back to you on that one. I [11:12] have a question. Uh, so this whole package is all [11:16] proposed changes. There is nothing in here indicating existing conditions. [11:22] Is that correct? Let's. See. You're saying showing. Well, so [11:29] the point of us even talking about this project is [11:33] that they're proposing significantly altering an existing building. And all [11:40] that we see in this package front of us and [11:45] from the presentation. That evokes anything existing or at the [11:49] photographs, but we can't see like an existing demo and [11:54] proposed plan compare that to a floor plan or a [11:58] site plan. So it's hard for us unless we hear [12:02] it from you as far as infilling to get that [12:04] square footage. We can't really see it. I understand what [12:09] you're saying. We have included the, uh, yeah, the floor [12:14] plan is included, but the demo plan is not included. [12:22] Sheriff, I may. I know, um, as far as what's [12:26] typically shown, what we have as far as our design [12:29] review checklist, it doesn't include, um, what's existing. It just [12:34] includes what's being proposed. I know it's typical that we [12:36] do receive it. Um, but however, it's not, it's something [12:41] that we can make a modification to if that's something [12:44] that the architecture, review commission is concerned about. But as [12:48] far as our checklist, the way that it's set up, [12:50] it doesn't have what the existing designs are. As part [12:54] of the required checklist. Can we make a motion on [13:01] that that we'd like to see that? Or how does [13:02] that work. It would be a separate item. On the [13:09] motion you mean? Not for this motion, but for, um, [13:13] follow - up discussion. Okay. Thank you. From the pictures, [13:19] the existing building, the north end of the building has [13:26] Commissioner Buksey pointed. It seems to be following the slope [13:30] of the build. But we'll need clarification. Off if that's [13:37] a new. Parpet flat roof on the back. Or you're [13:42] just in closing the opening. So it's not clear. And [13:51] that's something we'll have the applicant clarify. Any more questions. [14:01] At this time I'll open the public period. I invite [14:05] the applicant providing additional information. That they can. [14:20] State your name. Cornado. Nice to see everyone. So, uh, [14:26] to talk about the back area there on the south [14:30] side. So what we had to do is we had [14:33] to raise the ceiling. Because we had to create the [14:36] MR shielding for the, for the, uh, MRI machine. So [14:41] that there was an existing parapet, but we did have [14:44] to raise the parapet because I had to raise the [14:46] roof structure. To accommodate for the MR shielding. So yes, [14:52] there already was an existing parapet, but we had to [14:54] increase it a little bit because I had to increase [14:56] the, uh, the roof height in that area. So it [15:03] was raised a little bit here to accommodate that. Thank [15:08] you. Anything else you want to explain that she did [15:12] a good job? Yeah. So in regards to the floor [15:16] plan essentially, I hadn't changed the footprint of the building. [15:20] The footprint of the building literally remains the same. It's [15:24] just the open patios that are in the building have [15:27] just literally been enclosed in that area. So if you [15:30] take a look at A dash 100. 1. Uh, on [15:38] the bottom side there where you see the elevation, we [15:42] pretty much just enclosed that area. Cause right now that [15:44] interior area is just a open area. That transients pretty [15:48] much hang out in that area right now. So we [15:50] closed that out. On the west side, Office 101, that [15:57] structure remains the same. We're essentially just infilling the exterior [16:01] wall. On the west side. And that area pretty much [16:06] stayed exactly the same. And we're adding a standing seam [16:09] one inch batten seam roof to that area. On the [16:12] east side, I will be removing that, that arched opening. [16:18] And this will be a new, uh, extrusion build out [16:21] here. But the footprint remain the same. And I just [16:24] squared it off so that I can have more room [16:26] inside for the lobby area. Uh, everything else that you [16:30] see on here is existing exterior structure. If you go [16:36] to sheet A dash 100. 2. And the hallway 133. [16:44] Essentially that area back to those walls that you see [16:47] to the, to the left is all open patio. You [16:50] can see I essentially closed off that exterior wall. And [16:54] that's, and that's how we pretty much were able to [16:56] gain the additional square footage to create a hallway for [16:59] all of the new imaging and office areas. So that's [17:05] essentially what we did to close off the area. There [17:07] was no square footage edition other than the footprint that [17:10] was already remaining. Also the architectural features of the building [17:15] all remain the same. I'm not changing any of the [17:17] exterior structure of the building at all. Other than that [17:21] back South area where we're raising the ceiling to create [17:24] that parapet to raise it for the CT scan. If [17:29] you go to sheet A dash 100. 3. Uh, we've [17:33] created a mezzanine, a storage mezzanine on the second floor [17:40] for their, uh, secured, uh, expensive medical, you know, whatever [17:45] they have up there. Uh, so that's what we've did [17:48] on the second floor. But all encapsulated within the existing [17:51] structure of the building. Because this was a church that [17:54] area was raised and we had substantial space to add [17:56] that square footage. A 110, that's just the window. Windows, [18:06] I mean, the door schedule. A101 is the exterior window [18:10] schedule. Uh, A130 is the roof plan. And you can [18:14] see the modifications that we made to the roof on [18:17] the, on the south side here. We've, you know, included [18:21] that, you know, included the raised pair of pits here. [18:25] We're going to have a fiber type roof and the [18:28] sloping is going to go to an existing drainage that [18:31] was already in place in those locations. Uh, on the [18:35] west side here, or the east side, we have the [18:39] build out that I was talking about with the roof. [18:41] That's also going to be a fiber type roof system. [18:44] And I've added a drain system there as well for [18:46] it to drain off of that roof. And essentially the [18:49] roof will drain as it originally drained from the previous, [18:54] uh, build out. Um. These are the exterior elevations. Um, [19:01] I do have existing elevations that I can present if [19:05] you guys need to see them. That's not a problem. [19:08] They've already been created. But essentially you're essentially going to [19:12] see the same exact view because there's really no architectural [19:16] portions that I'm actually modifying other than accentuating the removing [19:20] the cross and putting the stone veneer at the front [19:24] entrance on the north side. And then raising the parapet [19:28] there for the MRI room. Other than that, and on [19:33] A10, you'll see on A201. That's the new, uh, pop [19:39] out here that we did for the front entranceway. And [19:44] you can see these in the color renderings where the [19:47] openings there. I've enclosed it. Remove the cross. We're going [19:51] to be putting the stone. On the existing on A202. [19:57] That will be removed. And then new facade will be [20:00] put on the new entrance way. On the. East side [20:08] here. You can see this all essentially remains the same [20:11] other than in closing. You can't see it because the [20:14] tree's in the way. But essentially it's the same thing. [20:16] This, the area on, uh, A203 on the upper right [20:20] - hand corner. Looks exactly the same as A202 on [20:25] the lower right - hand corner. Those two openings are [20:30] essentially exactly the same. We're just in closing it here [20:34] on the other one because we're able to make those [20:36] offices work within the existing space. A - 204 is [20:42] just the color. Pretty much the exterior colors. We're going [20:47] to match the adjacent buildings because the doctors own. That [20:50] was Jason buildings there. So it's just going to be [20:53] a smooth plaster. A smooth white plaster. Um, we have [20:57] reglets. Those one inch reglets that we're going to incorporate [21:00] here to try to give it a little bit more [21:02] pop. And we have the stone. On the north side. [21:07] And then we're going to be having the staggered. We're [21:11] going to be having the, you know, standing seam on [21:13] the pop out on the roof. And for the vertical [21:17] features, it's going to be a vertical panel staggered seam. [21:21] It's more of like an inverted standing seam system. And [21:24] you can see a little bit more of that. If [21:26] you take a look on A205 on the upper right [21:30] - hand corner, it kind of gave you a picture [21:33] of kind of what that will look like. The lower [21:36] area on H - 205, that's the standing seam. That [21:41] will be sitting on the adjacent roof on the east [21:44] side. I'm proposing at this point that it's a matte [21:48] black. And then for a little bit more detail on [21:55] the sections on A300, you can essentially see kind of [21:59] here what I'm doing. Especially on the south side that [22:01] you guys talked about raising this area. This is essentially [22:05] the, you know, a section cut through that area to [22:08] kind of show what's going on. Also you can see [22:11] on F10, on A300. The section cut here through the [22:17] new entryway. And what the difference correlation would be on [22:22] the east side versus the west side there for the [22:25] leaving the existing area filled in with the standing seam [22:28] and the new entrance build out. Uh, A301 provides a [22:36] little bit more detailed information in regards. I have a [22:41] question. I don't know if I'm going too much on [22:43] this, but no question. Yeah. Keep continue. Okay. Yeah. A301, [22:48] that's just a little, uh, better cross section of that [22:50] existing condition and how we're infilling that new wall area. [23:00] And that's essentially it for the architectural. If you guys [23:03] have any more questions, I'd be happy to answer them. [23:05] Okay. Thank you. Um, is there any member of the [23:09] public who would like to comment on this item? Please [23:11] raise your hand to speak. If you are joining the [23:13] meeting by telephone, please press star nine to raise your [23:17] hand to speak. None. Okay. Now we can ask questions [23:23] at the applicant. Okay for she 300, A300 on your [23:31] sections. Why is some of the lines are dashed and [23:35] some are. Solid doesn't mean. Oh. Those are just gas. [23:47] Sorry. Uh, yeah, those are areas are just dashed because [23:51] I caught a cross section through them and it just [23:52] kind of indicating of cutting through the wall in that [23:55] area. It's not demolition. No, this is everything that you [24:01] see on these plans is all new construction. Essentially for [24:05] the demolition, the interior, we've already gutted the entire inside [24:10] of the existing building here now. So, and we already [24:13] got demolition permit and all that's already been completed. And [24:17] all abatements all been done already as well. But we've [24:20] essentially gutted the entire inside of this. The new construction [24:23] would just be infilling the patio portions. And going on [24:28] the inside from there. Uh, I got a question for [24:36] you. On your sheet A204. It says [24:45] East elevation. I think it's supposed to be west, right? [24:53] Is this the only place where you're calling out the [24:55] MS2, which is the standing seam metal roof. Correct. Microphone. [25:05] Should I just leave it on? Still breathe heavy. So [25:11] yeah, the MS2 is only going to be on that [25:14] on the, uh, west side, correct? So is it more [25:18] of a fascia detail than an actual roof? I mean, [25:21] are we seeing the, just a standing sea metal roof [25:23] that I'm going to add to that right now. It [25:25] just has a plaster finish on top of it. I'm [25:28] going to, I'm going to add the standing seam to [25:30] help bring in more of the standing seam elements around [25:34] the building to help tie it together. But do you [25:37] really, you don't really see it, right? I mean, if [25:39] you go up to A203, you've got a nice perspective. [25:44] Kind of coming from the southwest that looks at it, [25:47] right? Yes. So yeah, that's pretty much what you'll see. [25:51] Obviously we'll be cleaning up some of the landscaping there [25:53] so you can hopefully see the building a little bit [25:54] better. But yes, that tree is to remain in that [25:57] area. The tree. You're the palm? Well, the tree there [26:01] and there's palms in front of it. Okay. Well, I [26:04] was just thinking that, you know, you're not really seeing [26:06] too much of your standing sea metal roof, right? It's [26:09] more of a fascia detail. Facial. It's just the roof [26:15] system that we're going to be putting on there to [26:16] help alleviating type of leaks that would also be going [26:19] on top of that roof as well. I think it'll [26:21] help. Cause right now it's just an open, it's just [26:24] an open area. What's probably leaks like crazy. So I [26:27] introduce a standing scene to help mitigate any leakage in [26:30] that area and kind of make sure that we're sealing [26:32] it off correctly. Right. But was that an Architectural decision? [26:37] I mean, I'm just wondering, cause you don't really see [26:38] it. Right. I mean, it's kind of a flat slope. [26:41] Yes. It was an architectural decision. Like I said to [26:45] make sure that we handle any water leaks or water [26:49] mitigation into that new area. So are you rolling those [26:52] ribs down on that fascia detail? Is that what really [26:55] makes it look? If you take a look at A301. [27:06] If you go to A301, it's pretty much a detailed [27:10] description here of what we're looking to do. So if [27:12] you look at A7, A301, that's how we're going to [27:16] be finishing up regarding the slanted area to help make [27:19] sure that they're on getting any waters through that, through [27:21] that cracked area there. We also have the Eve and [27:24] then we also have the general wheat screen detail at [27:27] the bottom. A11. So, so it really doesn't wrap down [27:36] into a fascia detail at all, right? Correct. It's just [27:39] the standing seam on top of the roof. The face [27:41] of that would be plastered to match the rest of [27:43] the exterior of the building. Right. Yeah. It's just so [27:47] flat. It's too bad we're going to miss out on [27:49] a good visual on it. Maybe we cut down the [27:52] tree there. Yeah. By the way, before I, I don't [27:56] want to sound just critical all the time. Nice set [27:58] of drawings by the way. I appreciate that. Thank you. [28:01] Um, I noticed on your roof plan. So it looks [28:05] like we're going to keep all the mechanical equipment on [28:08] the weth side of the building. Yes, sir. Nothing's going [28:11] on the roof. Yes, exactly correct. Yes, sir. Okay. Is [28:14] that Ruf Hatch existing up there? That's a new roof [28:17] hatch that I do need to create to make sure [28:19] that we can get on because the knot currently one [28:21] there now. Why do you need one? If the guy [28:25] put a roof hatch on it and get on the [28:26] roof versus somebody stacking a ladder up on the side, [28:29] it's a little more little safer. But if we need [28:31] to remove it, I have no, you don't need to [28:33] remove it. I'm just hoping you're not going to put [28:35] any equipment up there. Zero equipment's going on there. As [28:38] you can see, if you take a look at the [28:39] site plan G010, pretty much the second sheet. Okay. Pretty [28:47] much all of the equipment is going out there. We [28:50] have nothing on the roof. Just when we see roof [28:52] hatches typically, we see equipment. It's just pretty much to [28:56] get access in case anything gets up on the roof [28:58] where roof trains need to be re cleaned or anything [29:01] like that. And some are safe for somebody to get [29:03] up onto the roof and do whatever they need to [29:05] do. Good. Okay. Um, one, I think important architectural question [29:11] I have. You've got that nice vertical. Mass. That currently [29:18] has the crucifix on it. And you're going to collat [29:20] it in this. Eldorado stone. Correct. You got really two [29:26] really nice outside edges outside corners. Right. Have you been [29:32] successful in bringing those veneers together in an outside corner? [29:38] Thousand percent we have. Yes. We're going to, I'm going [29:40] to miter those. I want to, I like to miter [29:42] those corners. Okay. Plus they also plus if we can't [29:50] miter it. They also have corner pieces that you can [29:52] install in the corner of those areas as well. Yeah. [29:55] Yeah. Okay. I just think that would be really important [29:58] to pay attention to that detail. I mean, that's going [30:01] to be really sticking out. Stone's going to get your [30:03] attention. I've seen unfortunate applications where people didn't pay attention [30:08] to that detail. And it just kind of kills the [30:10] whole thing. Whereas with yours, um, I'm glad to hear [30:15] you guys are thinking about that and making sure, cause [30:19] I didn't quite, I didn't see a detail in the [30:21] set about mydering or anything like that. Yep. I don't [30:25] have that on here, mydering, but I'm here with the [30:28] contractor here as well. And, you know, we work together [30:31] on these things. So it's a, it's a kind of [30:34] a design build type thing. So we make sure that [30:36] we look at those type of things and make sure [30:38] it looks nice. I want that to look nice. So [30:42] for sure I'm going to make sure that that's going [30:43] to look good at the end of the day. Yeah. [30:45] No, like I said, you did a great job here. [30:47] Great set of drawings. And I think you did great [30:50] with the building form. Kind of keeping true to form [30:53] what was there and sort of modernizing it. But, um, [30:58] yeah, if we could just make sure that those details, [31:02] you know, are included in the approval. That'd be really [31:06] important. Sure. That was it for my comments. I got [31:11] one second. Are we still at questions to the applicant? [31:18] Yes. Okay. That should have been questions, not comment. Um, [31:26] looking at your roof plan A130, you're identifying a scupper [31:32] at the north end of the, called the major slope [31:36] right when it hits the new parapet of your, um. [31:40] Your scanner room. What shooting? A130, your roof plan. [31:51] So. I'm just curious. The main existing roof has a [31:56] pretty significant slope, right? Correct. And but there is still [31:59] a ridge going down the middle of it. Correct. So [32:02] water is probably going to be shedding off the roof [32:04] on each side before it even gets down to the [32:07] bottom where you have this new parapet. North end of [32:10] the building. Um. Even with the scupper there, um, do [32:18] you have a section that goes right through the middle [32:19] of that. I'm just, I'm wondering. Even if it's necessary, [32:28] um, to have a scupper there. And that if you [32:33] did run. Oh, you mean in the middle where it [32:35] transitions to the other side? Yeah. Straddling your ridge line [32:38] going through the parapet. Yeah. I've also talked to Al [32:41] Miller about this as well. I've talked to the roofers [32:44] here as well. We're probably going to open that up [32:47] even more because he's saying it's just better for it [32:49] to sheet flow into that area. Essentially, that's what it's [32:51] doing now. So yes, there won't, there won't be a [32:55] scupper there. We're going to just open that up. And [32:57] it's just going to sheet flow into that area. But [33:01] then those two little scuppers on the northwest corner and [33:04] the northeast corner would be sufficient for any of that [33:07] runoff. That's exactly what is doing now. That's exactly how [33:13] the runoff is happening at this current stage now. Do [33:17] you know what the existing slope is on that main [33:19] roof. I do not, I'd have to go back to [33:24] my plans and get that actual existing slow. There wasn't [33:28] a lot of as build information to go off for [33:32] this project since it was back in the 50s or [33:34] something, I think when this thing was. Yeah. And if [33:37] it's just going to follow that kind of gentle ever [33:41] increasing slope from the south end and the north end, [33:44] it then has a cross slope, which would take any [33:46] of that runoff over the edges. Okay. Thank you. Question. [33:55] Oh, so. Your elevations are labeled. Wrong, right? The east [34:03] means the west, the north, missed out. And so forth. [34:07] Uh, no, the north means the north. The south means [34:10] the south. East in the west. I thought I had [34:18] that correctly there, but I guess what's your question on [34:21] in regards to that other one? Um, the new roof [34:25] over by the, uh, what it's going to be the [34:27] lobby, the entry. Yes. Right now is this loping roof [34:32] and you are putting a standing same fascia flat roof. [34:43] Because without the existing conditions of demolition planner or existing [34:48] section. Can't tell if the proposed rule for your on [34:53] the east. It's neo - war existent. So if you [34:56] go to A300, right. And go to F10, the middle [35:04] one and the. Left - hand side, that is the [35:08] existing roof slope as it stands now. All I've done [35:13] is enclose the exterior wall and add it standing seam [35:17] to that portion. When you go to the right - [35:20] hand side, I have demolished that existing entranceway. And now [35:24] I'm creating this new, the new pop - out entranceway [35:29] here. You can see with parapets and as drains, where [35:33] everything to drain properly as well. Um, so that's essentially, [35:39] did I answer your question? Right. It's the existing entries [35:44] being demolished. And you put in a new roof for [35:48] the answer. Correct. But on this section cut, essentially the [35:54] existing section cut would just essentially look exactly like the [35:59] left - hand side. On the right - hand side [36:02] being removed. [36:14] I have one more question. And looking at L. Preliminary [36:19] Landscape Plan. Is the main entrance to the building going [36:24] to be the bottom right kind of cross. Which kind [36:29] of has an E dot T just below it. Is [36:32] that the main entrance to the building. Yeah. E. T., [36:37] yes. That door right there is the new, is the [36:38] main entrance to the building, correct? Golding into the lobby. [36:43] And then above that where there is additional paver. To [36:48] the left of Mediterranean fan palm, um, that basically looks [36:52] like patio right off of a long hallway. Correct. Okay. [36:57] And that hallway is not for, uh, patients to go [37:01] through. That's more of an exit. It's, it's for both. [37:05] Right. So they'll come into the lobby. And either they'll [37:08] meet in the exam rooms adjacent to the lobby. And [37:13] you meet with the doctor. Or they'll be pre - [37:16] scheduled to already have, uh, imaging session where they go [37:20] into the area, going to the dress and rooms. And [37:24] then from there, they would be going through those corridors [37:26] to get to the MRI or the CT scan. Or [37:29] whatever treatment that they would be going to do. So [37:32] yes, it's an exit corridor as well. Plus it's plus [37:36] the doctors also like to have an entrance other than [37:39] the front entrance as well. They usually like to enter [37:41] the building. Uh, but essentially none of the clients that [37:46] would be going there would be using these doors. They [37:49] would be coming in and out to front entrance. Uh, [37:51] the other doors are primarily for employees, but the hallway [37:54] will be used by both clients and the employees and [37:59] doctors. I have a question. On L2 [38:09] landscape imagery. You have three types of, um, ground material, [38:14] rock material. Decouples granite, fresh rock, three quarter cross rock. [38:19] And a boulders. But on the planting plan, I don't [38:22] really see how that's late being laid out is that [38:27] just missing from the plan or do I have outdated [38:29] plans. What's. So I do have my landscape architect on [38:36] the call here. Maybe it's better that he responds to [38:38] those. Okay. Um. [38:51] My name is Alex Kazukis. I'm the landscape architect. And [38:56] actually, thanks for pointing that out. We're, we're not going [39:00] to have the crushed rock proposed on the project anymore. [39:07] So we'll remove, we would remove that. So it's just [39:10] going to be DG and the boulders, right? I'm sorry. [39:19] Um, yes, it's just going to be DG. Okay. Thank [39:24] you. Another question I had was, um, the rest of [39:28] the parking lot is part of this property. Right? We [39:31] just, uh, updating planting as needed, uh, specify on your [39:35] plans. Sorry. What was the question. [39:45] So on L1, I have callouts for existing plan mature [39:50] to remain dead or dying plants to be replaced as [39:53] needed. I'm assuming that the rest of the parking lot [39:56] is still part of this, um, project. Right. Um, it's [40:03] not part of the landscape project, but, um, I guess [40:09] it's, it might be a part of, uh, the Reuben's [40:12] parking and all that. I guess I can feel this. [40:17] Yeah. So, um, yeah, the existing parking area that's there [40:21] is to remain as, however, it was other than trying [40:24] to clean it up here at this point. But it [40:26] is part of the property? It is part of their [40:28] property, correct? Okay. Thank you. Off you off that. If [40:34] the existing planting is to remain is the new planting, [40:40] uh, reflecting or kind of caring consistent specimens and ground [40:46] cover. For example, if we're calling out for new California [40:50] Gold DG, um, is that existing already, uh, in these [40:54] medians, uh, do we have existing. Chilean mesquites or blue [41:03] Palo Verde. In these medians? Like, are we being consistent. [41:10] If we're leaving the existing as it is. Yeah. That [41:13] was the intent to stay consistent. It's currently, um, drought [41:20] tolerant, um, sparse planting. And we're going to be sticking [41:24] with that theme. And we're, we're, um, sharing a lot [41:27] of the same, uh, trees that are existing. We're, we're, [41:32] uh, implementing them in the new plans as well. [41:54] Any more comments, questions. Questions. Um, I have, uh, I [42:01] have a question. I'm going to go back to the, [42:03] to the roof, the long existing roof. Um. Just cause [42:10] I'm a little, little confused about what's happening there. I've [42:14] never, I've never seen anything like that. Where you have [42:17] a roof, you know, that's a hundred feet long or [42:19] something. It's all sloping from the high point to the [42:23] low point. Looking for the roof plan now. Except there's [42:27] a ridge in the middle of it that doesn't seem [42:29] to have. A purpose. I'm looking at the big arrows [42:33] that are pointing north. They're going to the low point [42:37] of the roof. And is that, is there really a [42:42] ridge there? There is. Okay. So is it causing the [42:45] water to actually like shed off and go down the [42:49] sides of the building instead of just run down to [42:52] the bottom? The roof is actually kind of like a [42:54] V. So this roof is in caving like this. Oh, [43:00] so, so it's a low in the, it's not a [43:02] ridge. It's a valid. It's a valley. It's low in [43:06] the middle. That's better. So the water is coming and [43:09] that's why it's shooting right down the middle of this [43:11] thing. And you can tell when you go inside the [43:13] building, you can see the trusses are inverted. In creating [43:18] that valley. So yeah, the ridgeline. It is, it is [43:21] depressed. Okay. So that's what's creating that valley for the [43:26] water to sheet flow into the lower area. That's much, [43:28] much better. Now that scupper makes sense. Yes. Much, much [43:31] better. Okay. Sorry for that. I mislabeled that. No, no [43:36] worries. Um, and did you say that that roof is [43:41] covered with fiber type. The existing roof right now that [43:45] sits there right now as a built up roof system. [43:48] Right. And, and the main component of it, it's relatively [43:50] in good shape. And to save costs for the owner, [43:54] we tried to keep it in place. It was just [43:56] the areas that were remodifying that I am putting a [44:00] fiber type roof on the back end here to make [44:02] sure everything drains properly. Also on the new area and [44:06] then standing seam on the, on the, uh, other pop [44:10] out there on the right left hand side. Okay. So [44:14] that, that big roof, existing roof in the middle, that's [44:17] going to remain a built up root. Okay. Okay. I [44:24] don't have any other questions. Right. Anybody else any questions [44:29] or we. Ve got it. Chair, if I may, um, [44:33] I know the question was asked as far as the [44:36] historic, if they had it been evaluated. So this site [44:40] previously went through a change of zones. So it was [44:43] previously designated differently. And then the zone was changed. Um, [44:48] as far as the date and the age of the [44:50] building, it does fall within the criteria of possibly being [44:54] historic. But as far as any type of designations, it's [44:58] not a part of any designation. So, um, for the [45:01] certificate of appropriateness would be the vehicle for us to [45:05] evaluate that. If it was designated as a historic resource, [45:10] since it's not designated, then we don't have, um, the [45:14] direction that we've been given from counsel is to, um, [45:18] give the property owners the ability to make modifications to [45:22] their buildings. So that's the direction that we've been given. [45:26] It is listed on the recent survey for Circle potentially [45:31] historical. So our survey is, we do have a survey [45:35] and it is on that list. However, that list is [45:38] not a certified list. So if it was certified, then [45:42] if they would be required to go through that certificate [45:45] of appropriateness process for the historic preservation aspect of it. [45:50] But since it's not, it's not designated and it's not [45:54] recognized certified lists by the city. Then it does not [45:58] have to go through that process. We're good to go, [46:01] as they say. Correct. Okay. That was the question. All [46:06] right. No other questions than, uh, should we, uh, make [46:12] a motion or see what we can do with this [46:14] project. Or do you have discussion. I've discussed. Okay. Let's [46:18] do discussion. All right. Um, yeah, I guess I'll go [46:25] ahead and start it off. Um, so. Yeah, I, I, [46:30] uh, first of all, I agree. It's really nice set [46:33] of plans. Um, you guys do good work. Um, but [46:37] I have to, I have to critique some of the [46:40] design that I'm looking at here. Um, you know, and, [46:45] and regardless of the building being historic or not, I [46:49] didn't even cross my mind. It's a, it's a very [46:54] elegant design. It's, it's a really interesting unique striking design [47:01] because it's such a simple form. Um, and the, the [47:07] pieces that are coming off to the east and west [47:10] that we've been talking about, um, you know, they're also [47:14] simple and have an elegance to them. Um, I think [47:19] the one on the west that's being filled in with [47:22] the standing seam roof on top. I think that's fine. [47:25] It's very simple. Um, I think you will, you will [47:28] see the standing seam. I think, you know, it's surprising [47:32] when something has an angle to it how you might [47:34] think you're not going to see it, but yeah, you [47:36] end up seeing it. Um, the, the appendage on the [47:41] east side, that's your new entrance. Um, I was having [47:46] a hard time kind of figuring that out because in [47:49] the, in the 3D images, it keeps getting covered up [47:52] with trees. I can't see it in the 3D images. [47:56] Um, so I have to rely on the elevations. And [48:00] I can see the existing form. I'm looking at sheet [48:04] 8202. And in the bottom right I see what's their [48:08] existing. And I'm sure it's, you know, it's in bad [48:13] shape and whatnot. Um, but from a design standpoint, I [48:17] see an elegance that I really like. I think that [48:21] new entrance that you're proposing looks like it belongs on [48:25] a different building, not this one. Um, I think you [48:29] could make an entrance that is at least inspired by [48:34] what's, what's their currently. And, you know, keep it simple. [48:38] It doesn't have to cost a lot or, or be [48:41] something crazy, but just something simple and elegant, like, like [48:46] the building. And that looks like a part of the [48:49] building. Um. And then in the back. That piece I [48:58] asked about, um, in the beginning, cause I wasn't sure [49:01] if that was an addition or not, um, sort of [49:04] the same thing. You know, the existing building just has [49:07] this roof that slopes from, it's high on the south [49:11] then and it slopes down to the north end really [49:14] strong, simple form. And what you're proposing there looks like [49:22] in addition. Um, that doesn't really. Compliment the building very [49:30] well. Um, I think that whatever you do on the, [49:35] on that north end needs to have a little more [49:39] elegance to it to tie into that strong form that [49:42] you're working with. You have a really. I think good [49:45] opportunity here. I liked when I, when I first looked [49:47] at this, before I really started studying the pieces and [49:51] I was looking at sheet 8202 and I looked at [49:53] proposed and I looked at the existing up at the [49:56] top of that sheet, I don't know if you can [49:57] put it up on the screen or not, Peyton. [50:18] Give me one moment. Okay. [50:37] Sheet A202. Oh, okay. Let's see. Oh. Let me, okay. [50:48] My apologies and share the wrong screen. You were saying [50:53] the proposed elevation screen? Yeah. If you just go to [50:57] 8202. Right now I just, it would [51:07] take me a little bit longer to pull up the [51:09] project exhibits. I could pull up what I had on [51:11] that presentation. Okay. Do you have a sheet that shows [51:16] the existing and proposed. [51:29] All right. It looks like it's, it's broken up. Maybe. [51:34] I have it broken up here. All right. Let's give [51:40] me a moment. I could pull up the plans, but [51:42] for now I just have the, that's all right. Okay. [51:45] I don't want everyone to just have to sit here [51:47] too long. Um, but in, and everyone can see their [51:51] own sheet 8202. Um, I looked at it, I looked [51:55] at that and went, wow, this is really cool. You [51:57] know, I like, I like basically what you guys are [52:00] doing. I think it's great. Um, and, and, uh, you're [52:04] taking, uh, special building, um, you're refreshing it. Um, so [52:10] I'm really, really excited about that. Um, it's just when, [52:14] when you start looking at some of the pieces, it's [52:16] like, Oh man, you know, and this is like our, [52:19] our one chance at this, once this is built, it's [52:22] going to look like that for 50 years. So, um, [52:26] I want to make sure that, you know, everyone's happy [52:29] and excited about it in the end. So that's why [52:33] I made those comments I made about those different appendages. [52:37] Um. And there are some details. But those are, I [52:43] think I'm going to stick with the broad brush important [52:45] one. I think are important things. And I've mentioned them. [52:54] I'd like to jump in if we can keep that [52:56] pay job. Kind of, um, harking back to what Commission [53:01] of Bucks Aquish is mentioning now with this simple but [53:04] elegant roof line. And to, um, Commissioner McIntosh was asking [53:09] about earlier with this El Dorado Stone cladding on the [53:12] south end, which is, uh, arguably the most prominent end [53:17] of the building. Um. If you look at the proposed [53:23] in the existing part of the elegance of the existing [53:26] was that this southmost end of the cross, the holding [53:30] the crucifix maintained the slope of the building. And if [53:34] you look at the image here in the top right, [53:36] you can see that that slope continues his trajectory up [53:38] to the cross. Um, yet in the proposed, uh, where [53:44] kind of abandoning that relationship by raising what looks like [53:48] a chimney now, uh, a few feet above the, um, [53:51] southernmost call it perpendicular roof edge. And, um, I, I, [53:59] I want to say that, you know, what we're looking [54:02] at here is an improvement to what's existing. But I [54:05] am concerned about that one corner. And it could be, [54:09] um, corner meeting that call it chimney element. It could [54:13] be a combination of the changed roof line. Um, and [54:17] the material, uh, usage. But, um, you know, the very [54:21] strong. Material change on the southeast corner where we're infilling [54:29] what was kind of a covered outdoor area, um, standing [54:35] seam metal element. And it just feels a little, it [54:40] feels detached switching to the El Dorado Stone and raising, [54:44] um. Raising that roof height. Um, so it's not following [54:49] the existing slope of the building anymore. And it seems [54:54] like there's opportunity to kind of bring it back while [54:58] still improving it. Um, otherwise, uh, [55:08] understanding that the slope of the roof is actually not [55:11] a ridge, but a valley took some questions away about [55:13] the water overflow. Um. But, uh. That's all I got. [55:22] I have a comment. I agree with Commissioner Buksek. The [55:29] first thing I saw on the additions is that are [55:34] not following the architecture. This is a 1968 building by [55:39] Richard Harson. It's on the historical survey, but it might [55:44] not be destinated. But, uh, the least thing we can [55:48] do is just try to be compatible with the architecture. [55:53] So I'm not totally in agreement with the entry treatment. [55:57] And the north side addition that looks like an addition [56:01] with the flat roof higher. Than this elegant sloping roof [56:05] going down. And, um, on the west side, the patio [56:12] that sticks out, I think it's a good call to [56:17] just put the standing seam on top and leave the [56:21] roof sloping the way it is. But on the east, [56:26] um, that entries, it can be enhanced. And make it [56:31] work again to provide the entry for the new, for [56:34] the renovated building. Also, I'm happy to see that the [56:41] void on the soth side has been enclosed. Because if [56:45] you notice, it's been fenced out because I was a [56:49] room for homeless people to gather there their night. But [56:54] I don't agree on the angle of the standing seam [56:58] roof. That it doesn't really need to follow the taper [57:04] ends. And I think the proposal of evacia might not [57:10] be right because the left side of that void is [57:14] actually straight, not in an angle. So if you put [57:19] the standing seam panels vertical, it might look better. So [57:27] those are the. Three areas that are not comfortable with, [57:32] um, for this building. Any other comments? [57:43] I have a few comments. Okay. Um, pretending to the [57:46] landscape. It's a great plant palette you have here. A [57:53] great mixture of, um, a low water used plants. What [57:57] I do see missing is some type of ground cover. [58:00] That can help you, um, fill in a lot of, [58:03] a lot of the landscape as needed. But, um, more [58:06] importantly when it comes to the plant layout, I don't [58:09] see really a consistency with the new plant arrangement compared [58:14] to what's already their existing on the rest of the [58:17] parking lot. From the, um, planting design. It seems to [58:22] be more before more, um, structured plant layout, more on [58:28] center planting. And as you look on the street view [58:31] of the rest of the parking lot, it looks more [58:34] organic natural arrangement of plant material. So it's going to [58:38] be a stark difference between existing and new, uh, new, [58:42] uh, the new planting design as you get closer to [58:46] the building. And I feel like it would be a [58:48] disservice to have a brand new looking building with new [58:53] landscape plant material by the building. But as you approach [58:57] from the street side into the parking lot, you're going [58:59] to have a mixture of old and new plant material. [59:03] So it's going to look like two different projects, two [59:05] different properties where, where, uh, new plan materials starts at [59:09] one point and then ends at the existing, um, parking [59:14] lot. I feel like for consistency either new plans should [59:19] be installed throughout the parking lot. Not just near the [59:22] building. And or match the plant arrangement to either be [59:27] formal like you have on the new plant. Layout. Or [59:32] to match was existing, which would be more of a [59:34] natural organic arrangement of the plant material and not be [59:38] on center planting. Just as a comment, [59:48] uh, when it comes to the pettylamth as being used, [59:51] um, it's a great plant. Um, it will need some [59:53] shade. And it seems like in some of the locations [59:56] that it's being proposed, um, you would have a chance [1:00:01] of the plant material not making it, especially when it's [1:00:05] getting full sun exposure throughout the day. It would need [1:00:08] constant yearly, um, uh. Yeah, shading and providing replacing the [1:00:18] plan material way too often. Maybe come maintenance problem later [1:00:21] down the road. But, uh, overall, um, I think it's [1:00:25] a good plant palette. It's just might need some rework [1:00:28] to be done to be able to seamlessly work with [1:00:31] the existing landscape and or replace the existing landscape. Thank [1:00:36] you. Comments. I've seen. That. So do we want to [1:00:46] make a motion in some form. I'd like to take [1:00:50] a crack at it. Okay. Um, and yeah, the reason [1:00:54] I want to take a crack at it is, um, [1:00:57] I want to say, you know, I made some general [1:00:59] comments about, about a couple of the parts of the, [1:01:03] of the building, um, and I have ideas about what [1:01:07] you could do on the East End and what you [1:01:09] could do on the north end, but I didn't want [1:01:11] to say it because, you know, you guys are good [1:01:14] designers. And I think you need, you deserve to take [1:01:18] a crack at it and do what you think is, [1:01:20] is right based on the comments you hear. And, you [1:01:23] know, and bring it back. I don't want to have [1:01:25] you guys walk away with a list of, oh, well, [1:01:29] gee, let's lower this and let's, you know, at a [1:01:31] standing seam roof over here and, you know, um, I [1:01:35] don't know what some other comments, um, maybe would be, [1:01:39] Oh, let's, let's make this standing seam straight, not, not [1:01:42] sloped. You know, if you guys have reasons for what [1:01:45] you did, I'm going to say if you have aesthetic [1:01:49] reasons that you feel strongly about, you can push back [1:01:54] and say, you know, and give us design reasons for [1:01:58] why you want to do it this way or that [1:02:01] way. We can have, we can have a design discussion [1:02:04] about it. Um, so I think it'd be good to [1:02:09] give you guys that opportunity to come back based on [1:02:12] what you've heard. And with a modified proposal, um, and [1:02:17] then, and then, you know, defend your design. You might [1:02:22] lose. Um, but, but if you feel strongly about it, [1:02:26] I'll tell you in the past when, when an architect [1:02:30] has, has given me good reasons for why they did [1:02:34] what they did. And I might, I might disagree a [1:02:37] little bit philosophically, but I'm the first one to back [1:02:39] off if, if I think what they're saying has merit. [1:02:50] The public comic has ended. So, uh, as far as [1:02:57] making a motion, um, I'm going to ask staff, how [1:03:01] general can we keep it? I know typically you guys [1:03:03] like, you know, to have some kind of list of [1:03:07] comments that we can hand to an applicant, um, is [1:03:12] that really necessary. So it would be, it's beneficial for [1:03:18] the application to be able to have the information as [1:03:22] far as the, I know different commissioners weighed in. But [1:03:27] yeah, providing information on how giving them just general direction. [1:03:33] So then that way they know what they need to [1:03:35] correct or adjust. So that way they can bring the [1:03:38] item back. Okay. Um, so I would propose to condition [1:03:43] the project with the, with the following comments, um, number [1:03:50] one, um, revisit the East entrance to make it more [1:04:00] cohesive and complementary to the existing building design. To revisit [1:04:09] the North end of the building, um, and parapet design [1:04:15] that's being proposed. To revisit the fin at the south [1:04:25] end that's being proposed to be clad in stone. Um, [1:04:30] and to revisit the standing seam, um, curtain wall product [1:04:40] that's being proposed at the south end and how it [1:04:44] integrates with the, with the existing building. And to, um. [1:04:53] To restudy the landscape plan so that it's a more [1:04:58] cohesive landscape design throughout the entire site, not just around [1:05:03] the building. What did I miss. Anyone want to add [1:05:10] to that? Oh, and to reconsider the specification for the [1:05:17] pedal anthys. And whatever he said. [1:05:28] If you don't afford it's worth, um, cause we went [1:05:30] over. Does that have a common name. Slipper plant. Slipper [1:05:34] plant to revisit the use of the slipper plant. And [1:05:43] I agree with, with your breakdown, by the way, um, [1:05:45] but I just wanted to point out, because we've reviewed [1:05:48] another project before where an applicant was proposing to put [1:05:52] in some plantings, um, on call it the addition on [1:05:55] this building. But the opposite side that was existing to [1:05:59] remain wasn't really kind of following through. It was clearly [1:06:03] a different design. Um. There's clearly more work done in [1:06:08] the landscape plan around the new building that wants existing [1:06:10] around the rest of the parking lot. Um, I would [1:06:13] consider, um, if they wanted to, to, um, make the [1:06:19] rest of the property follow suit to the new design [1:06:22] as an option. Versus telling their landscape architect to change [1:06:27] the design to conform to someone else's design. Right? Exactly. [1:06:32] Okay. Okay. Any more. All right. For the record, Commissioner [1:06:40] Vuxic, was that a condition of approval or are you [1:06:44] motioning to continue? Forgive me. I'm motioning to continue. I [1:06:47] think there's enough here. We, we need to look at [1:06:49] it again. Okay. Yeah. Okay. Should we take a phone? [1:06:53] We need a second. I'll second. You got a second. [1:06:57] Uh, one second. All right. Motion by FUXIC second by [1:07:01] Sanchez Commissioner Voksick. Aye. Commissioner Sanchez. Aye. Commissioner McIntosh. Hi. [1:07:09] Commissioner Garcia. Aye. Vicer Gregory? I am. Chair Blakely. Aye. [1:07:14] Motion carry 60. Thank you. And I'm going to ask [1:07:21] the applicant to stick around for one more minute. I [1:07:23] just want to make sure that you guys don't leave [1:07:25] with some confusion about what to do on that landscape. [1:07:28] Cause I'm a little confused. On it. Um, so this [1:07:32] is kind of like after the fact, just, just quick, [1:07:36] quick discussion. Um. Are, are we going to, are we [1:07:42] expecting them to come back and, and, and propose a [1:07:48] new landscape plan for the entire parking lot. And, and [1:07:53] if we are, and you guys can't do that. Then [1:07:57] you need to come back and say, and say, Hey, [1:07:59] you know, Hey guys, we can't do that. Yeah. Yeah. [1:08:07] Hi. Can we get you on a microphone, please? Well, [1:08:12] I'm sorry. I guess it's not. Yeah. We're in a, [1:08:14] we're in a public meeting. So yeah, go ahead and [1:08:17] come over here and just turn it on. Here. All [1:08:20] right. So my name is Oscar Lua. I'm the managing [1:08:24] partner for DIG. And I'm also the general contractor and [1:08:27] Reuben is our designer, uh, but yeah, this property does [1:08:31] have a shared parking with, uh, the enabling properties. So, [1:08:36] um, to mandate to have other property owners who I'm [1:08:39] not familiar with. I know there are other owners that [1:08:42] own this parking lot as reciprocally use. Uh, what takes [1:08:45] some time, uh, to come in and have the landscape [1:08:49] architect, which I'm sure would have to go to just [1:08:51] like it is here. A commission, the voting, uh, what [1:08:55] landscape architect and then what that design would look like [1:08:58] or the entire property rather than the specific property that [1:09:01] is owned by this parcel. Does that pertain to existing [1:09:08] planetary? That's there that you're calling out to replace as [1:09:10] well? Are you going to those same people as you [1:09:13] replace? We would have to. Yes. Uh, again, the partnership [1:09:16] also owns, uh, part of the neighboring parcel. And both [1:09:21] conditions, uh, for the parcel that we own and the [1:09:24] neighboring have reciprocal use agreement. So therefore all costs must [1:09:30] be split, including improvements and maintenance. So the, the, the, [1:09:40] the motions been made and it's been approved. Um, but [1:09:45] you guys can certainly come back and explain, okay, this [1:09:48] is what we would propose. And this is why. I [1:09:53] think what, what brought this common up in the first [1:09:56] place was that you have, I'm just going to say [1:09:59] you have prominent frontage on Fred wearing. Right. And, uh, [1:10:03] your scope of work, your limit of work is at [1:10:07] pretty close to significant intersection. Townsend our way and Fred [1:10:10] Waring. And the proposed landscape design is covering about half [1:10:15] of that frontage. And then there, defined transition from what [1:10:21] is a more, um, call it like a systemic, uh, [1:10:27] aligned force design of rows and patterns that then all [1:10:33] of a sudden, uh, becomes more of a sparse, more [1:10:36] natural flow of plants. So, um, I think what I [1:10:41] was trying to, to at least put out as an [1:10:43] idea is that rather, you don't want to change this [1:10:46] landscape design. It's obvious, right? But you're suggesting also that [1:10:49] it's more complicated to revise the existing parking lot landscading [1:10:55] landscaping. Um, but perhaps there's a way to maybe, massage [1:11:00] the frontage along Fred wearing so that there is a [1:11:04] more of like a uniform look along the street that [1:11:07] then as it goes back towards your building, might change [1:11:10] into this new design that was presented to us. Does [1:11:17] that make sense? Yeah. I mean, that's something I understand. [1:11:20] I understand that. But it's just difficult. I'd have to [1:11:23] understand what the architect means and what that means with [1:11:25] the neighboring owners. It's not one or two owners. There's, [1:11:29] uh, multiple property owners within the condo eyes project next [1:11:32] door. So, um, yeah, I'd have to explore what that [1:11:36] looks like and what that means because I'm sure today [1:11:38] they're not mandating to change it. But, uh, because of [1:11:41] a new building, they're just going to say that's, that's [1:11:44] your problem, right? So that's what I would tell them. [1:11:47] I'm not building a new building. You are. But to [1:11:50] redo the entire parking lot, that'd be, uh, that would [1:11:53] be the case. Yeah. Too much. But even if, if [1:11:57] your landscape architect, you're able to look at the, the [1:12:00] South elevation, Fred wearing drive landscape and was able to [1:12:05] maybe take a page out of the existing landscape's book [1:12:09] and feather that into as your landscape proceeds towards the [1:12:12] building, towards the north, the parking area. That remains as [1:12:16] designed. Am I making sense? It's making sense. I mean, [1:12:21] the easy solution to me to take it all the [1:12:23] way into the entrance all the way there, but that's, [1:12:26] you know, it's something we'd have to look at and [1:12:32] do a study on and see what it is. Because [1:12:35] ultimately we'd have to redesign that, submit that to CVWD [1:12:39] that we have and all that, right? So even if [1:12:41] it's the subtle part right here. Chair, if I may, [1:12:46] we should be cautious of continuing the discussion since the [1:12:50] item has already been a decision has already been made [1:12:53] to continue the item. Um, so this discussion can be [1:12:56] followed up as part of the next, um, design review. [1:13:01] My question, should we make an amendment to what we [1:13:04] just voted on changing what we just talked about. So [1:13:08] as far as the motion, the motion was to continue. [1:13:11] The item with the direction. So with the applicant having [1:13:14] that information that came following after is just the minutes [1:13:19] are just going to look a little different. But yeah, [1:13:22] I think the applicant understands what the commission is looking [1:13:24] for. Just want to make clarify that. Okay. Yeah. It [1:13:30] is John said earlier. You have the right to come [1:13:33] back and defend your position. Right. Yeah. Understand. And I'll [1:13:37] have to have a discussion with my consultants and my [1:13:39] landscape architect. And I know the back of the building, [1:13:42] which is the north end. There's a very specific piece [1:13:45] of equipment that we need to look at. But how [1:13:47] can we aesthetically make it better? Right. We need to [1:13:49] maintain the heights and the clearances, but can it look [1:13:53] better? Yeah. Sure. Let's, let's look at what aesthetically we [1:13:56] can do with para bits. But the height will need [1:13:59] to maintain in order for us to achieve what we're [1:14:01] looking forward, our medical facility. But absolutely more than happy, [1:14:07] uh, to look at any architectural elements that we can [1:14:09] do. Uh, you know, it isn't a parking lot. So [1:14:12] we want to make sure that we're conscious of that [1:14:15] and what, what kind of, uh, costs would go into [1:14:17] that. Right. Making the east entrance simpler. Thank you. It [1:14:24] would cost me less. So, uh, certainly we'll look at [1:14:26] all the elements. We'll certainly regroup with my architectural team [1:14:30] and design team and, uh, come back with something with, [1:14:33] uh, with the comments that we've got from today's meeting. [1:14:36] Great. Thank you. Okay. Thank you. You got it. Okay. [1:14:42] Now we move on. Um, Committee meeting updates. Cultural art [1:14:47] committee. We do have something, um, as I said before, [1:14:52] for some reason, uh, Palm Desert is becoming the art [1:14:56] section of the Coachella Valley. So there is an organization [1:15:01] called Planair. It's a outdoor painting situation, uh, got a [1:15:08] brochure here that got approved. They ask Palm Springs Acom [1:15:14] Springs Life. Where would they like to put this. And [1:15:19] they decided Palm Desert. So Palm Desert is going to [1:15:22] be the location and Palm Springs life is going to [1:15:25] sponsor it. And it's going to be an outdoor event [1:15:27] on El Paso. So we are moving forward as a [1:15:32] city to be the Art of the Valley. That's the [1:15:36] Architect. Before I turn the page. Um, so for staff, [1:15:46] um, we do have a new member of our planning [1:15:49] team, uh, Travis Heaps. He's joining us coming from the [1:15:53] private sector and also with Public Sector experience. Also fellow [1:15:58] Ca Poly Alumni. So we're excited to have him on [1:16:01] board. And so he'll be seeing more of him. Yes. [1:16:09] Okay. Um. Request fraction. Are there any commissioners who like [1:16:14] to propose a future agenda item to be considered by [1:16:16] the Commission. I'll make the one. What about making a [1:16:22] motion or considering, uh, would you do four plants. Yeah. [1:16:31] Um, what was presented to us today could be construed [1:16:34] as like a permit submittal. Um, minus the existing demo [1:16:41] plans and sections and all that stuff. But from an [1:16:44] aesthetic standpoint, it helps us, we have no understanding of [1:16:47] the project at all except for those few pictures of [1:16:49] existing to have a comparison of what's existing and what's [1:16:53] proposed. Yeah. And that's, that's something that we can look [1:16:58] at as far as our checklist. So the checklist is [1:17:01] what's provided online. So that's typically whenever, um, we're giving [1:17:05] guidance to applicants to make sure that they have a [1:17:07] complete application is that they're adhering to our checklist. Um, [1:17:12] for whatever reason, existing elevations and existing floor plans, it's [1:17:17] not, I know it's typically provided, but as far as, [1:17:20] um, it being a hard requirement, we can revisit that [1:17:23] and take a look at our checklist and see if [1:17:25] they need to be updated. Um, also too right now, [1:17:27] we're going through a lot of ADA changes on the [1:17:30] way that we have our handouts. Um, so this is [1:17:33] probably a good time to be able to look at [1:17:35] that and, um, make changes. We can request that. As [1:17:40] a commission. Uh, so it's something that SAF will take [1:17:43] into consideration. And we'll report back as far as if [1:17:50] we're able to make those changes. Yeah. I think it [1:17:54] doesn't have to be demolition because that's getting a construction [1:17:56] documents. It's really just understanding aesthetically what it looked like [1:18:01] before and what it's going to look like after heights, [1:18:03] all those things. Sure. Anybody else. Okay. [1:18:14] With no other questions. I moved to adjourn this meeting [1:18:16] hearing no objections. I declare the meeting adjourned at. 150. [1:18:31] Recording stopped.