1 00:00:16,379 --> 00:00:19,039 foreign 2 00:00:51,800 --> 00:00:58,800 good evening and welcome to the Paso Robles Planning Commission of March 14 3 00:00:56,480 --> 00:01:02,539 2023. I'd like to call a meeting to order and if you would please stand and 4 00:01:00,360 --> 00:01:05,539 join me in the Pledge of Allegiance thank you 5 00:01:06,659 --> 00:01:16,799 pledge allegiance to the flag of the United States of America and to the 6 00:01:12,119 --> 00:01:16,799 Republic of which it stands foreign 7 00:01:24,020 --> 00:01:30,420 thank you item C on our agenda is roll call staff would please conduct the Roll 8 00:01:28,979 --> 00:01:34,920 Call commissioner Christensen present 9 00:01:32,340 --> 00:01:40,500 commissioner Connolly commissioner cover rubius here commissioner Davis 10 00:01:38,159 --> 00:01:45,060 commissioner Marlow here commissioner Neal here commissioner kogler here 11 00:01:42,840 --> 00:01:49,200 record will reflect the commissioner Davis's absence she had a family 12 00:01:46,619 --> 00:01:52,320 emergency okay and if you're a student of roll calls you did notice there are 13 00:01:51,000 --> 00:01:56,100 two new names you probably hadn't heard before so I would like to formally 14 00:01:54,060 --> 00:01:59,100 welcome Pat and Eric to the Planning Commission in a bit larger public forum 15 00:01:57,780 --> 00:02:02,820 than it was the last time we were together so welcome we look forward to 16 00:02:01,380 --> 00:02:05,180 working with both of you and the rest of the commission 17 00:02:05,219 --> 00:02:10,020 um okay um item e on our agenda is the election 18 00:02:08,039 --> 00:02:13,860 of chairperson and vice chairperson of the Planning Commission and I would like 19 00:02:12,180 --> 00:02:19,560 to kick that off with a quick comment and then probably a motion uh past 20 00:02:17,040 --> 00:02:24,540 practice and patterns have been that the pro tem moves into the chair position 21 00:02:22,800 --> 00:02:28,920 um on an annual basis and when we were together about a year ago 22 00:02:27,000 --> 00:02:33,300 um Mr Neal was the pro tem and wasn't in a position to assume the chair and so I 23 00:02:30,840 --> 00:02:36,660 continued for a second year at this point in time Joel I think schedule has 24 00:02:35,220 --> 00:02:40,739 gotten a little more rational at least I hope so and I believe he's more amenable 25 00:02:39,060 --> 00:02:45,060 to the motion I'm going to make which would be to advance Joe Neal to the 26 00:02:43,440 --> 00:02:49,620 chairperson of the Paso Robles Planning Commission that is a motion and it would 27 00:02:46,920 --> 00:02:53,220 take a second to proceed second by commissioner cover rubius 28 00:02:51,660 --> 00:02:57,120 I'll second that seconded by commissioner cover rubius uh 29 00:02:55,920 --> 00:03:01,200 any further discussion or other nominations 30 00:02:59,099 --> 00:03:04,920 hearing none I would ask for a roll call vote to be taken 31 00:03:03,000 --> 00:03:10,140 commissioner kogler aye commissioner cover rubias aye 32 00:03:07,560 --> 00:03:14,760 commissioner Neal aye commissioner Christensen 33 00:03:11,940 --> 00:03:20,840 aye commissioner Marlow aye commissioner Connolly I motion passes six zero 34 00:03:21,000 --> 00:03:27,540 well I guess I get to do the vice president oh he does doesn't he yeah 35 00:03:24,120 --> 00:03:30,980 you're no longer there there I'm gone my name tag and moving on 36 00:03:36,599 --> 00:03:39,200 good luck 37 00:03:44,239 --> 00:03:51,599 so before I dive in I would like to very much thank 38 00:03:48,420 --> 00:03:56,760 um former chair kogler for his two years of a hard and diligent effort as 39 00:03:54,060 --> 00:04:02,159 chairperson of the Planning Commission um I think I probably threw him a 40 00:03:58,260 --> 00:04:06,180 curveball last year but uh thank you again mark 41 00:04:03,599 --> 00:04:11,220 so with that I'll be accepting um nominations for vice chair 42 00:04:09,000 --> 00:04:16,079 if I don't hear anyone I will make that nomination myself and I nominate Ty 43 00:04:13,920 --> 00:04:18,380 Christensen for vice chair I will second that 44 00:04:19,320 --> 00:04:28,620 any uh other nominations or further discussion 45 00:04:24,479 --> 00:04:31,160 seeing none who is the second Mr Kohler foreign 46 00:04:39,600 --> 00:04:47,120 ER Marlow aye commissioner Connolly hi motion passes 6-0 47 00:04:48,180 --> 00:04:54,199 so Vice chair Christensen you want to move over next to the chair 48 00:05:00,840 --> 00:05:03,560 this is 49 00:05:25,340 --> 00:05:30,919 great I think we may have skipped over staff introductions 50 00:05:30,960 --> 00:05:35,940 Warren phrase community development director 51 00:05:34,020 --> 00:05:40,380 Marcie Reynoso and Ashley Peterson Administrative Assistant also Darcy 52 00:05:38,100 --> 00:05:45,080 Delgado is remote she's an associate planner 53 00:05:42,180 --> 00:05:45,080 their International 54 00:05:45,280 --> 00:05:48,440 [Music] 55 00:05:53,419 --> 00:06:00,840 great and with that um it's now time for general public comments regarding 56 00:05:58,020 --> 00:06:05,699 matters not on the agenda as anybody in the audience wish to speak for matters 57 00:06:02,699 --> 00:06:09,900 not on the agenda Marcy anybody online no callers saying 58 00:06:08,820 --> 00:06:15,360 none close that portion and we'll start 59 00:06:12,479 --> 00:06:20,280 public any agenda items proposed to be tabled or rescheduled this evening there 60 00:06:17,639 --> 00:06:24,600 are none okay thank you in the next section is public hearings our first 61 00:06:22,979 --> 00:06:27,560 public hearing of the evening is a conditional use permit 62 00:06:27,680 --> 00:06:33,419 23-01 for an automobile dealership p23-002 63 00:06:36,240 --> 00:06:38,960 um staff 64 00:06:40,100 --> 00:06:43,299 [Music] 65 00:07:00,560 --> 00:07:07,380 Katie Bannister associate planner so this as you said is a conditional use 66 00:07:04,380 --> 00:07:13,199 permit for a new motor car dealership to be located out on combine Street 67 00:07:10,680 --> 00:07:18,600 so here is an image of combine streets kind of a loop of Street in the 68 00:07:16,259 --> 00:07:23,280 southwest corner is the new project site this was formerly proposed to be used 69 00:07:21,060 --> 00:07:26,940 for caps construction the both Planning Commission and DRC reviewed different 70 00:07:25,080 --> 00:07:32,460 site details for this site a number of times but now a new use is proposed here 71 00:07:29,780 --> 00:07:35,699 LVS motor I'm forgetting the name motor cars there 72 00:07:34,560 --> 00:07:40,979 we go um so moving on so the project request 73 00:07:38,819 --> 00:07:46,199 as I said is a conditional use permit um this is a used auto dealership but it is 74 00:07:43,080 --> 00:07:51,599 for kind of a niche market uh cars these are special I think um sometimes uh 75 00:07:48,660 --> 00:07:55,500 vintage cars and higher end vehicles um they are going this project is going 76 00:07:53,580 --> 00:07:59,759 into an existing building um the building does have seven on-site 77 00:07:57,660 --> 00:08:04,259 uh outdoor parking spaces that would be available for customers and the 78 00:08:01,979 --> 00:08:09,180 employees to park in in addition there's an indoor showroom it has space for 79 00:08:06,720 --> 00:08:15,360 about 15 to 20 cars um the the parking that is being 80 00:08:11,880 --> 00:08:20,160 proposed on the site is car dealerships there's not a specific parking ratio 81 00:08:17,340 --> 00:08:23,460 that's in our in our municipal code and so there is a note within the parking 82 00:08:22,080 --> 00:08:27,240 standards that says when there's not specific parking requirements and 83 00:08:25,440 --> 00:08:32,159 interpretation of parking impacts and spaces needs and parking spaces that are 84 00:08:30,060 --> 00:08:35,580 needed based on a similar use can be determined by the community development 85 00:08:33,899 --> 00:08:39,360 director and ultimately by the Planning Commission so this evening staff is 86 00:08:37,500 --> 00:08:45,300 recommending that the on-site parking requirement be based on sort of the 87 00:08:41,339 --> 00:08:49,560 office and um and customer spaces which would require I believe six parking 88 00:08:47,820 --> 00:08:54,779 spaces but there are actually seven parking spaces required or excuse me 89 00:08:52,560 --> 00:08:59,220 provided so um a look at the operations for the 90 00:08:57,120 --> 00:09:04,380 the business they will be open Tuesdays to Saturdays from 9 to 6 p.m there'll be 91 00:09:02,040 --> 00:09:09,240 three employees working on this site um and as I said in a previous slide 15 92 00:09:06,060 --> 00:09:14,040 to 20 Vehicles can fit in that showroom um and for viewing and purchase but the 93 00:09:11,399 --> 00:09:18,300 business does also include an e-retail component I think a lot of the business 94 00:09:15,360 --> 00:09:21,600 gets done on the internet so people do will come to the site to look at cars 95 00:09:19,980 --> 00:09:26,160 but they'll also have the opportunity to have that interaction online the 96 00:09:23,820 --> 00:09:30,660 businesses does not include any vehicle service nor part sales so that all the 97 00:09:28,560 --> 00:09:34,680 trips to the site will be for those looking at the cars there in the the 98 00:09:32,760 --> 00:09:39,180 showroom so here is a look at the site and floor 99 00:09:36,839 --> 00:09:43,200 plan I'm there on the bottom left you can see that there is that large indoor 100 00:09:40,860 --> 00:09:47,160 vehicle showroom but then there's the conference room and offices there off to 101 00:09:45,120 --> 00:09:51,120 the east side of the I guess I'm stating that wrong because 102 00:09:48,899 --> 00:09:53,700 uh North would be to the to the left here so on the south portion of the 103 00:09:52,680 --> 00:09:58,019 building is where you've got the customer and conference room areas so 104 00:09:56,160 --> 00:10:02,580 the office and Lounge is just about 2 000 square feet you've got almost three 105 00:09:59,459 --> 00:10:07,200 thousand square feet of showroom you can get a look at the peek at the 106 00:10:05,040 --> 00:10:11,459 elevations there so um the existing site looking at the 107 00:10:09,779 --> 00:10:16,080 colors and Landscaping these are recent pictures this is a recently installed 108 00:10:13,320 --> 00:10:21,779 site so it's fully landscaped all the um the finishes are on the building 109 00:10:19,080 --> 00:10:25,680 um here you see a image from the West at the top and then there is an enclosure 110 00:10:24,360 --> 00:10:30,720 at the rear um the the enclosure did go through 111 00:10:27,660 --> 00:10:34,500 several rounds of DRC review even the setback for that the fence was reviewed 112 00:10:32,880 --> 00:10:38,180 by the Planning Commission as well and so here is the fence in place 113 00:10:38,820 --> 00:10:44,279 um so one of the questions that the DRC had about the project was how do the 114 00:10:42,660 --> 00:10:48,360 vehicles get into the building there is a roll-up door on the west side of the 115 00:10:46,500 --> 00:10:52,680 building and then you can see in the bottom what that showroom space will 116 00:10:50,579 --> 00:10:55,980 look like so there's some there's some storage in there now for caps 117 00:10:54,060 --> 00:11:01,920 construction But ultimately that will will go and the the um the vehicles for 118 00:10:59,100 --> 00:11:06,660 sale will be shown in that showroom there is one sign proposed it would be 119 00:11:04,500 --> 00:11:12,600 on the south facing elevation it's a black metal backer with a laser cut logo 120 00:11:09,540 --> 00:11:16,140 and it will be led backlit the dimensions of the sign are four feet by 121 00:11:14,279 --> 00:11:21,980 eight four feet tall by eight feet wide you can see it there superimposed on the 122 00:11:18,300 --> 00:11:21,980 elevation at the bottom as well 123 00:11:22,100 --> 00:11:28,200 so um we are recommending some changes to the draft resolution we would like to 124 00:11:27,120 --> 00:11:33,480 add we would like the Planning Commission to add one whereas recital 125 00:11:31,500 --> 00:11:37,500 um or excuse me it would be an amendment to one of the whereas statements 126 00:11:35,519 --> 00:11:42,120 um as you can see it would instead of saying that it's that the applicant is 127 00:11:40,320 --> 00:11:47,880 requesting a reduced parking requirement instead you would be making a finding 128 00:11:44,880 --> 00:11:53,220 that uh seven on-site parking spaces would be the required parking for this 129 00:11:50,820 --> 00:11:57,600 use permit in addition um in the draft resolution and the 130 00:11:54,899 --> 00:12:03,959 findings the finding number four we would recommend that some added language 131 00:11:59,700 --> 00:12:08,820 be put at the bottom so that the um the the use is compatible with its 132 00:12:06,480 --> 00:12:12,060 location and based on the fact that the seven on-site parking spaces are 133 00:12:10,440 --> 00:12:17,220 determined to be compatible at this location based on the specific use and 134 00:12:14,459 --> 00:12:23,100 as Allowed by the Paso Robles Municipal Code Municipal Code table 135 00:12:20,060 --> 00:12:28,160 21.22.01 there's a note that states that uh that an interpretation can be made to 136 00:12:26,459 --> 00:12:35,040 set the parking needs based on parking impacts and 137 00:12:31,380 --> 00:12:39,600 needed parking based on the use and then in the conditions of approval 138 00:12:37,560 --> 00:12:44,160 staff is recommending that a condition 13 be added that would authorize the 139 00:12:42,480 --> 00:12:48,180 establishment of this luxury used car dealership and within the existing 140 00:12:46,139 --> 00:12:52,380 building and it would specifically call out that the parking requirement for 141 00:12:49,920 --> 00:12:56,519 this is seven parking spaces in addition a condition is recommended that would 142 00:12:54,660 --> 00:12:59,820 require if they make any changes to the project that result in changes to the 143 00:12:58,200 --> 00:13:04,139 floor plan that would increase that increase the size of that Office 144 00:13:01,560 --> 00:13:08,040 customer Lounge area it would require an amendment to this conditional use permit 145 00:13:05,820 --> 00:13:11,339 so that we can take another look at parking 146 00:13:09,480 --> 00:13:14,639 the Planning Commission always has options the first and what staff is 147 00:13:13,200 --> 00:13:19,320 recommending is that you approve the attached resolution with those 148 00:13:16,940 --> 00:13:23,760 recommended changes that that would Grant approval of the conditional use 149 00:13:20,820 --> 00:13:27,600 permit and allow seven on-site parking spaces you could certainly make 150 00:13:25,680 --> 00:13:32,880 amendments or to um and as we're recommending changes to the the 151 00:13:29,579 --> 00:13:36,420 resolution and and continue to approve the conditional use permit if the 152 00:13:34,860 --> 00:13:39,860 Planning Commission would like to reject the the application you would need to 153 00:13:38,279 --> 00:13:44,339 make specific findings that the project does not comply with 154 00:13:42,240 --> 00:13:49,079 any of the required findings and that um concludes staff for staff's 155 00:13:47,040 --> 00:13:55,459 report I believe we do have a representative from the business in in 156 00:13:51,600 --> 00:13:55,459 the uh in city hall with us this evening 157 00:13:55,800 --> 00:14:02,300 great Katie thank you so much I was wondering if you go back to the changes 158 00:13:59,100 --> 00:14:02,300 the conditions of approval 159 00:14:03,300 --> 00:14:09,360 and those are the two changes so those would be the changes to the 160 00:14:07,800 --> 00:14:13,800 conditions of approval the previous slide would be some changes to the 161 00:14:11,040 --> 00:14:19,459 language in the resolution itself so I'm looking at our conditions of approval on 162 00:14:15,480 --> 00:14:19,459 page 19 and I only have eight 163 00:14:20,459 --> 00:14:26,360 so those should probably be probably be numbers nine and ten okay thank you 164 00:14:26,959 --> 00:14:35,300 and then with that I'll allow the applicant to speak this is the time we 165 00:14:31,800 --> 00:14:35,300 usually do that if they so wish 166 00:14:39,480 --> 00:14:45,980 hello my name is Michael tenor um 167 00:14:43,199 --> 00:14:45,980 do you have any questions 168 00:14:47,339 --> 00:14:54,660 we may and you have something great job I mean everything I would say she pretty 169 00:14:52,920 --> 00:14:59,880 much said it exactly um all of the vehicles will be stored 170 00:14:56,639 --> 00:15:04,920 inside overnight during the day the parking area will be for for customers 171 00:15:03,360 --> 00:15:09,500 there's not a lot of Staff that's going to be there so we're not taken up by a 172 00:15:06,600 --> 00:15:09,500 lot of staff 173 00:15:09,899 --> 00:15:13,699 and yeah 174 00:15:14,160 --> 00:15:17,120 great thank you 175 00:15:19,019 --> 00:15:25,620 and with that I'll ask I'll ask the commission if they have any 176 00:15:23,279 --> 00:15:27,920 questions uh commissioner Marlow any questions 177 00:15:28,079 --> 00:15:32,639 of Staff or the applicant yeah I'm just curious 178 00:15:31,380 --> 00:15:35,959 um are you going to be washing and detailing cars at this location 179 00:15:38,699 --> 00:15:45,240 everything else will be off-site so detailing will be off-site service will 180 00:15:42,300 --> 00:15:49,320 be off-site all other aspects of the business are offsite great and then any 181 00:15:47,279 --> 00:15:53,339 plans for a future expansion additional employees 182 00:15:50,420 --> 00:15:59,760 possibly future employees but only like one or two at best probably not for a 183 00:15:56,639 --> 00:16:05,100 while cool that's all I got commissioner Conley 184 00:16:02,760 --> 00:16:12,300 I have a question I guess more for staff if there's a change in ownership a 185 00:16:08,519 --> 00:16:16,800 change in a business at this location does the uh 186 00:16:14,399 --> 00:16:22,079 does the conditional use permit get Revisited or changed because you uh you 187 00:16:20,220 --> 00:16:26,940 this conditional use permit has specifics to this project this owner in 188 00:16:24,660 --> 00:16:31,680 this business if the business changes does the conditional use permit get get 189 00:16:28,760 --> 00:16:33,980 Revisited that's more for staff yeah 190 00:16:34,320 --> 00:16:36,740 um so if 191 00:16:36,899 --> 00:16:42,120 if over this operation and operate in the same way as this business they could 192 00:16:40,860 --> 00:16:45,779 continue to operate under this conditional use permit if they make any 193 00:16:44,040 --> 00:16:50,940 changes like say they wanted to continue doing a car sales but it there were 194 00:16:48,959 --> 00:16:54,420 changes made to you know the operations it would require an amendment to the 195 00:16:52,920 --> 00:16:58,620 conditional use permit if it's not consistent with the conditions you have 196 00:16:56,220 --> 00:17:01,079 you would approve this evening if some other permitted use there you know 197 00:17:00,120 --> 00:17:05,280 there's lots of things that are permitted in the C3 zoning District that 198 00:17:03,660 --> 00:17:09,540 doesn't require a conditional use permit they could they could also operate um 199 00:17:07,559 --> 00:17:14,880 you know without Planning Commission action but um what you're approving 200 00:17:12,419 --> 00:17:21,319 doesn't necessarily isn't specific to this owner but it is specific to the way 201 00:17:16,799 --> 00:17:26,220 this project is proposed thank you commissioner Christensen 202 00:17:24,660 --> 00:17:29,700 thank you Katie um 203 00:17:27,000 --> 00:17:33,000 I have a couple questions when this project was originally 204 00:17:31,260 --> 00:17:36,960 approved this building um I noticed I'm very familiar with the 205 00:17:35,280 --> 00:17:42,480 neighborhood over there um that it's under 5 000 square feet was 206 00:17:39,900 --> 00:17:44,760 this building sprinkle sprinkler at the time 207 00:17:43,260 --> 00:17:47,660 and would it be required now that they're adding Office Space 208 00:17:49,679 --> 00:17:55,380 no it sounds like the applicant is not when and there's nothing in this 209 00:17:53,640 --> 00:17:59,160 conditional use permit that would allow expansion of space I'm not familiar 210 00:17:57,660 --> 00:18:01,980 whether or not the building was sprinkler 211 00:18:00,240 --> 00:18:05,340 um Darcy is on the line when was more involved in with the Caps construction 212 00:18:03,660 --> 00:18:09,260 project Darcy do you happen to know whether or not fire sprinklers were 213 00:18:06,720 --> 00:18:09,260 installed 214 00:18:09,299 --> 00:18:17,280 I do not know if fire sprinklers were installed but as Katie mentioned 215 00:18:14,340 --> 00:18:21,780 um if you know they're not changing the the building score footage and so if 216 00:18:19,740 --> 00:18:25,980 they weren't required with the building Pro you know as the building was 217 00:18:23,220 --> 00:18:30,780 constructed and um and completed that the uh the request tonight did not also 218 00:18:28,799 --> 00:18:35,820 not trigger any uh changes to fire sprinklers 219 00:18:32,360 --> 00:18:39,960 thanks Lori so I'm just trying to make some clarification so because I was 220 00:18:38,460 --> 00:18:44,220 under the impression that there was added office spaces they're not a new 221 00:18:42,059 --> 00:18:48,000 lounge and added with additional office space or is that was was that original 222 00:18:45,840 --> 00:18:53,039 to the build out the customer Lounge this is Darcy again 223 00:18:50,340 --> 00:18:57,840 so the what's shown on the site plan and the floor plan 224 00:18:54,059 --> 00:19:01,679 um was originally a belief I can take a look 225 00:18:58,500 --> 00:19:06,419 um you know dedicated office area and look I believe that the applicant has 226 00:19:04,020 --> 00:19:10,620 just superimposed you know the um the terminology that they're using 227 00:19:08,160 --> 00:19:14,760 for their customer Lounge maybe he can answer that a little bit better 228 00:19:12,600 --> 00:19:19,500 um since he updated the site plan I can answer both of your questions so 229 00:19:16,559 --> 00:19:24,299 no there is no sprinklers uh Devin Mr Katz stated that if it was over 5000 230 00:19:21,900 --> 00:19:30,059 square foot that needed sprinklers this building is for 4814 I believe 231 00:19:28,320 --> 00:19:35,580 um as far as the customer Lounge that was going to be Devon Cap's showroom so 232 00:19:33,120 --> 00:19:39,840 that is nothing's been added um or built out that was originally in 233 00:19:37,860 --> 00:19:44,039 his plan the conference room offices all of that 234 00:19:42,480 --> 00:19:47,580 stuff is all the same as it was for death 235 00:19:46,080 --> 00:19:51,360 okay so um this is for staff 236 00:19:49,260 --> 00:19:54,299 um so essentially if there's not a change in use the the requirements don't 237 00:19:53,340 --> 00:19:57,960 change um even though the square foot of the 238 00:19:56,280 --> 00:20:02,340 building satisfies what the original requirements were is that correct that's 239 00:20:00,600 --> 00:20:05,820 correct if there's any changes that require building perimeter occupancy 240 00:20:03,960 --> 00:20:08,460 changes our building department can look at it and make sure that it's complying 241 00:20:07,320 --> 00:20:13,080 but I don't believe it needs fire sprinklers okay okay 242 00:20:10,320 --> 00:20:16,559 um then another question um 243 00:20:14,940 --> 00:20:21,660 one of the questions was answered about the detail and that was a great question 244 00:20:18,600 --> 00:20:26,460 um how many employees are anticipated to be employed at this location 245 00:20:23,940 --> 00:20:29,220 so the applicant estate and anticipate having three three 246 00:20:27,720 --> 00:20:32,640 employees and then I think previously indicated in the future they might like 247 00:20:30,840 --> 00:20:38,820 to add maybe one or two um as my understanding okay so 248 00:20:36,059 --> 00:20:41,280 um was worse and I was just trying to clarify this because the way I was 249 00:20:39,900 --> 00:20:45,000 reading I was a little confused were seven 250 00:20:42,299 --> 00:20:49,740 parking spaces originally on site already that's right the project was 251 00:20:47,820 --> 00:20:53,880 there a warehouse use and so yes seven parking spaces were provided this is not 252 00:20:52,200 --> 00:20:57,720 exactly a warehouse that's got a bit more customer 253 00:20:54,980 --> 00:21:01,260 orientation but because um like if if the showroom was an 254 00:20:59,640 --> 00:21:06,179 uncovered showroom we wouldn't require parking for you know like we've got car 255 00:21:03,059 --> 00:21:11,100 dealerships along theater drive and we don't make them you know provide parking 256 00:21:08,220 --> 00:21:14,460 for those parking spaces so staff is recommending that we would treat this 257 00:21:12,720 --> 00:21:19,440 showroom similar to how we would treat an outdoor parking area so we would just 258 00:21:17,400 --> 00:21:24,120 make the app we would recommend that the applicant provide parking for just the 259 00:21:21,840 --> 00:21:30,120 offices and Conference kind of the more human oriented areas 260 00:21:27,780 --> 00:21:34,400 okay I think I understand that thank you Katie 261 00:21:31,200 --> 00:21:34,400 um let's see 262 00:21:35,460 --> 00:21:40,020 I think I've got another question I'll let someone else ask some questions at 263 00:21:38,880 --> 00:21:44,460 this time commissioner 264 00:21:42,240 --> 00:21:47,159 thank you just a couple questions um 265 00:21:45,299 --> 00:21:50,580 the sign that's being proposed there's a sign on the building right now that 266 00:21:48,900 --> 00:21:53,940 looks like this site but I don't believe it's in the same location can you tell 267 00:21:52,679 --> 00:21:58,799 me is that the sign that's going to be relocated is that the sign we're dealing 268 00:21:56,640 --> 00:22:04,799 with just one sign not more than one the sign I'm sorry the sign that is on there 269 00:22:01,799 --> 00:22:10,260 right now is a temporary sign for uh DMV licensing so it has to be a certain size 270 00:22:07,460 --> 00:22:17,640 at least so it has to be a two by two sign next to the address for DMV 271 00:22:14,220 --> 00:22:21,240 purposes when the sign goes up on the the big sign goes up that will still 272 00:22:19,620 --> 00:22:27,179 work because you can still take a picture of it and see the address and 273 00:22:23,340 --> 00:22:30,360 the big sign so that is that sign is temporary it was actually I'm gonna go 274 00:22:28,620 --> 00:22:33,960 take it down tonight actually they came and did their inspection today so that 275 00:22:32,280 --> 00:22:39,240 sign is rectangular though it's not two by two it's a two by three signs so the 276 00:22:38,100 --> 00:22:43,080 one that will be permanent will be larger and up higher correct as proposed 277 00:22:41,340 --> 00:22:46,320 okay very good thank you then another question for you quickly will you Market 278 00:22:44,520 --> 00:22:52,980 through bring a trailer and similar auction sites not a hundred percent sure 279 00:22:49,559 --> 00:22:58,559 on that yet a lot of online sources so cars.com CarGurus things like that 280 00:22:56,340 --> 00:23:02,700 um possibly bring a trailer I haven't looked into that yet so would that be 281 00:23:00,900 --> 00:23:05,640 the Principal vehicle by which customers might come to look at a car if they 282 00:23:04,320 --> 00:23:08,820 happen to live in the geographic area and you advertise it in one of those 283 00:23:07,020 --> 00:23:13,140 forums they may come and look at it you see other scenarios in which the public 284 00:23:10,440 --> 00:23:16,679 actually comes to this site correct yes so you would come and do your test drive 285 00:23:14,700 --> 00:23:21,179 and everything else if if they needed to come to the area to purchase we've 286 00:23:19,500 --> 00:23:24,960 definitely I've been in the in the industry my whole life so sometimes 287 00:23:23,520 --> 00:23:29,280 people don't even come to the dealership they'll just buy and we'll deliver it to 288 00:23:27,059 --> 00:23:32,520 them and I assume occasionally you'd have a transport coming in to move 289 00:23:30,659 --> 00:23:36,000 product to and from typically yes so if we're going to do 290 00:23:34,679 --> 00:23:39,600 something like that we would put it on a truck you'd see a semi occasionally 291 00:23:38,159 --> 00:23:43,020 um not typically not not the way that we're going to do it our cars will be 292 00:23:41,100 --> 00:23:46,799 enclosed trailers right but so people like reliable have very large trucks 293 00:23:44,760 --> 00:23:51,000 that are in close trailers yeah I mean some of them are some of these okay all 294 00:23:48,659 --> 00:23:55,080 right thank you commissioner thank you um to the 295 00:23:53,700 --> 00:23:59,280 applicant real quick just for the commission to hear this 296 00:23:56,760 --> 00:24:03,600 um the the zoning requires that 25 percent 297 00:24:00,419 --> 00:24:08,100 be used vehicles is that right Katie right so what does the zoning ordinance 298 00:24:06,299 --> 00:24:12,480 allows is that if this was an entirely new if all the cars being sold on the on 299 00:24:10,440 --> 00:24:16,799 in the project were new It's actually an allowed use when you when the applicant 300 00:24:14,460 --> 00:24:21,120 introduces used car sales then it's a conditionally allowed use and so he he's 301 00:24:19,020 --> 00:24:25,440 here asking for a conditional use permit because he intends to sell used cars 302 00:24:22,980 --> 00:24:30,000 used cars so just to clarify that is the main advantage Vehicles is what I'm 303 00:24:27,600 --> 00:24:34,620 really starting to hear is that is that accurate more along the lines of luxury 304 00:24:32,039 --> 00:24:38,720 Vehicles okay high-end luxury cars okay but we also have a half a 305 00:24:43,400 --> 00:24:48,440 got it okay um all right no other questions 306 00:24:52,799 --> 00:25:00,960 thank you chairperson Neil um I know my other question was Katie I 307 00:24:58,260 --> 00:25:05,520 I had written note so you're you're saying that normally 15 spaces would be 308 00:25:03,840 --> 00:25:11,220 required but we're saying that we're comfortable with seven is that what I 309 00:25:07,740 --> 00:25:14,820 read here so for a commercial use of for a building that's I can't remember the 310 00:25:12,780 --> 00:25:18,659 exact size 4 800 square feet however much it is if we were considering the 311 00:25:17,039 --> 00:25:22,980 whole building to be just a regular commercial use it would require three 312 00:25:20,820 --> 00:25:27,059 parking spaces for every thousand square feet so that would be um you know so 313 00:25:25,320 --> 00:25:30,720 let's just call it five times three you know 14 15. 314 00:25:28,679 --> 00:25:34,740 um but because of the nature of what's being sold here the sort of the widget 315 00:25:32,460 --> 00:25:38,460 that's being sold is so large um you know we just don't expect as much 316 00:25:36,299 --> 00:25:41,460 customer turnover as we would if they were selling you know something smaller 317 00:25:39,960 --> 00:25:45,960 for you know five thousand square feet of say computer parts or you know 318 00:25:43,500 --> 00:25:49,740 something of a smaller nature would take less space I'm not explaining it very 319 00:25:47,940 --> 00:25:54,120 well but because of the nature of the type of of sales that are going on here 320 00:25:51,900 --> 00:25:58,980 staff is recommending that seven parking spaces would be appropriate and so to 321 00:25:56,580 --> 00:26:02,880 that follow-up question on that Katie so with the um 322 00:26:00,779 --> 00:26:06,659 as part of the cup there's no way to really 323 00:26:04,320 --> 00:26:10,799 monitor the amount of traffic hopefully you know I'm sure they want to be 324 00:26:08,400 --> 00:26:13,980 successful so but we can't limit you know they're they're saying they're 325 00:26:12,419 --> 00:26:17,580 doing a lot of it online or via phone and I'm sure they probably will today 326 00:26:15,659 --> 00:26:21,600 technology is great but I'm sure that they'll be 327 00:26:19,260 --> 00:26:25,200 um people wanting to come there we we haven't we in other words there's not 328 00:26:23,520 --> 00:26:28,980 really a way to monitor that under the cup is that correct so the intent of 329 00:26:27,539 --> 00:26:31,679 this up is to make sure that this business is compatible with the 330 00:26:30,240 --> 00:26:35,880 neighborhood it's not a staff recommendation but it is possible to 331 00:26:33,779 --> 00:26:38,400 review cups over time um we haven't really been in the 332 00:26:37,080 --> 00:26:42,480 practice of doing that and I'm not really recommending it but if you know 333 00:26:40,260 --> 00:26:46,919 if we are getting a lot of compliances this business is causing you know too 334 00:26:45,120 --> 00:26:50,279 much parking some sort of issue we can review that and and you know bring it 335 00:26:48,779 --> 00:26:52,919 back to the Planning Commission for your review 336 00:26:51,419 --> 00:26:58,159 um it would be a fairly extreme case where that would happen okay thanks 337 00:26:55,080 --> 00:26:58,159 that's it for me sir 338 00:26:58,260 --> 00:27:04,980 and I was on a DRC when this was um 339 00:27:02,700 --> 00:27:08,640 brought forward to DRC and I don't have any questions at this time 340 00:27:07,020 --> 00:27:11,820 um as this is a public hearing I'd like to open it up to the public or is there 341 00:27:10,559 --> 00:27:15,840 anybody in the audience that would like to speak to this item 342 00:27:14,220 --> 00:27:18,020 please come up state your name and address 343 00:27:27,240 --> 00:27:29,720 this 344 00:27:34,260 --> 00:27:40,260 hello thank you my name is Jim McKenzie I own 345 00:27:38,279 --> 00:27:44,460 the properties adjoining this we've had a significant amount of problem with who 346 00:27:42,419 --> 00:27:47,940 will end up being his landlord um so I just try to determine whether or 347 00:27:46,559 --> 00:27:51,720 not the person that's trespassed on our 348 00:27:49,799 --> 00:27:55,140 property destroyed our property done tons of things like that over the last 349 00:27:54,059 --> 00:27:58,860 couple of years is going to be the business owner so I don't want to affect 350 00:27:56,520 --> 00:28:03,299 him he has every opportunity to have to run a business but it was presented to 351 00:28:00,539 --> 00:28:07,860 me that this was he was partnering with the person we've had a lot of problem 352 00:28:05,340 --> 00:28:13,140 with the problem I do have with it is we've had opportunity we own four of 353 00:28:10,980 --> 00:28:17,700 the four Lots behind this and we've had opportunity to do 354 00:28:15,179 --> 00:28:23,340 um build the suits but because of the restraints of this we were not able to 355 00:28:20,220 --> 00:28:26,340 accommodate that so my fear is that if this is going to be accepted then we 356 00:28:25,380 --> 00:28:29,460 have all we have to do is say we're using it 357 00:28:28,020 --> 00:28:33,600 for one thing then change our use and then we can rent 358 00:28:31,380 --> 00:28:37,500 it for whatever we want and you know we have a gym across the street that has 359 00:28:35,159 --> 00:28:42,299 very little use of of Total Space because they needed so much parking 360 00:28:40,260 --> 00:28:45,779 this kind of falls in the same category I don't think they'll need as much 361 00:28:43,799 --> 00:28:50,159 parking but it definitely brings a concern of what the rest of the 362 00:28:47,520 --> 00:28:54,380 development is going to be and what US previous owners were able to develop 363 00:28:55,380 --> 00:29:00,900 prior to this so 364 00:28:59,100 --> 00:29:05,600 that would be it great thank you very much 365 00:29:01,620 --> 00:29:05,600 anyone else like to speak to this issue 366 00:29:06,419 --> 00:29:14,100 saying that Marcy anybody no colors and with that I will close public 367 00:29:12,659 --> 00:29:17,340 comment I'm not sure there was a question there 368 00:29:16,440 --> 00:29:25,520 um so bring it back to the commission for 369 00:29:21,000 --> 00:29:25,520 additional comment and or emotion 370 00:29:25,860 --> 00:29:31,020 but of course just a Clarity question I'm looking at page 19 under the 371 00:29:29,700 --> 00:29:35,220 conditions of approval it says the project shall be constructed I'm just 372 00:29:32,880 --> 00:29:40,020 for clarity the internal side of the property is it already like this or it 373 00:29:37,919 --> 00:29:42,659 still needs to be enhanced do the TI's need to be done or it's already like 374 00:29:41,220 --> 00:29:49,640 everything is the way it's going to be okay so it's already pretty much done 375 00:29:44,779 --> 00:29:49,640 okay okay all right thank you 376 00:29:49,980 --> 00:29:56,580 commissioner kogler uh no further discussion if there's no other 377 00:29:53,460 --> 00:30:00,600 discussion I'd be glad to offer a motion I do I'm sorry thank you 378 00:29:59,760 --> 00:30:05,039 um I do have a concern over the the way 379 00:30:03,720 --> 00:30:09,539 we're treating the parking and I understand that there's the parking 380 00:30:06,539 --> 00:30:14,580 space now my concern is for a lot of the the businesses that did develop there 381 00:30:12,840 --> 00:30:18,059 um they took into account that parking when they built the building out and 382 00:30:16,500 --> 00:30:21,720 when they designed that building knowing that there may be a future use issue 383 00:30:19,620 --> 00:30:25,380 down the road so I hope that this doesn't set some type of precedent 384 00:30:23,220 --> 00:30:31,140 because I feel like it's it's on the verge of that and we're just kind of 385 00:30:27,000 --> 00:30:38,399 skirting it by using this the the um storage space as uh as where the the 386 00:30:35,039 --> 00:30:43,440 new or new used cars would be which I could understand and I I could see that 387 00:30:40,640 --> 00:30:49,200 for luxury cars making sense I think that again I I feel that we're kind of 388 00:30:47,399 --> 00:30:53,100 doing a work around here to satisfy something that would have 389 00:30:50,880 --> 00:30:56,520 normally not been built in this way or probably approved if it wasn't 390 00:30:55,860 --> 00:31:00,299 um you know the way they're proposing the 391 00:30:58,440 --> 00:31:05,039 design and I do believe that there will be more employees there so the parking 392 00:31:02,039 --> 00:31:09,240 and customers I think will be limited either the employees will be parking on 393 00:31:06,840 --> 00:31:12,600 the street or the or the customers will be parking on the street one of the two 394 00:31:10,679 --> 00:31:16,580 will probably take place unless they can park inside so those are my thoughts 395 00:31:16,620 --> 00:31:19,399 Mr Conley 396 00:31:19,580 --> 00:31:28,080 I I agree with uh Ty you know with his comments I was gonna I was concerned 397 00:31:25,860 --> 00:31:33,779 whether it be off street parking and it doesn't look like it's provided here uh 398 00:31:30,240 --> 00:31:39,059 so uh with the same concern that you have three maybe four employees that 399 00:31:37,080 --> 00:31:43,080 doesn't leave much uh space for customers 400 00:31:40,919 --> 00:31:48,179 I agree thank you commissioner tomorrow no 401 00:31:45,600 --> 00:31:54,000 further comments so I do have a question there's a um Trailer Sales down on the 402 00:31:51,480 --> 00:32:00,299 other corner and I think they have two lots um for that trailer sales yard do 403 00:31:57,360 --> 00:32:06,659 we happen to remember what the parking ratio was for that particular facility 404 00:32:04,679 --> 00:32:11,640 sure I think this is Darren Ashley planner so 405 00:32:08,220 --> 00:32:17,820 I as you mentioned that project used more than one law I used at least three 406 00:32:14,940 --> 00:32:23,159 if I recall maybe more I don't remember what the specific ratio was but the uh 407 00:32:21,179 --> 00:32:27,480 they have quite a few parking spaces related to The Trailer Sales business 408 00:32:25,620 --> 00:32:34,980 and then they work on them and have different work on repair type Bays so 409 00:32:32,940 --> 00:32:40,260 they do have more they do have more room for parking lots they designed their 410 00:32:37,559 --> 00:32:44,880 building related to the type of use as kind of mentioned here you know these 411 00:32:42,539 --> 00:32:49,559 buildings were kind of built as shell buildings or warehouses with with some 412 00:32:47,100 --> 00:32:52,919 office use and that's how many of them are but to answer your question the 413 00:32:51,179 --> 00:32:58,380 trailer sales has much more room they built it for trucks trailers and the way 414 00:32:56,039 --> 00:33:03,480 in their building to maneuver that and they purchase the the building the the 415 00:33:01,919 --> 00:33:07,460 side and the building to accommodate that 416 00:33:04,559 --> 00:33:07,460 I think 417 00:33:07,860 --> 00:33:15,539 a lot of the Lots in the combine area are small a lot of times they were I 418 00:33:12,960 --> 00:33:20,159 don't remember this may have been two lots before and had to be combined to 419 00:33:17,519 --> 00:33:27,179 get this size I know a lot of the development in this area the Lots were 420 00:33:23,580 --> 00:33:31,200 just small historically and a lot of times more than one were used to get 421 00:33:28,980 --> 00:33:36,600 what's out there now I think the way to look at this is 422 00:33:34,440 --> 00:33:42,440 we have an existing building an existing parking and the parking was 423 00:33:39,059 --> 00:33:47,519 designed to accommodate a warehouse with an office and with this 424 00:33:46,200 --> 00:33:53,519 this one happened to have a small showroom this this probably has more 425 00:33:50,220 --> 00:33:58,620 parking spaces than many on combine that were more specifically warehouses 426 00:33:55,679 --> 00:34:03,539 so the the request tonight is for this use to go in here 427 00:34:00,659 --> 00:34:08,580 and they used to go in one of the reasons 428 00:34:05,820 --> 00:34:12,980 used car lots require use permits is where do the cars have 429 00:34:11,879 --> 00:34:17,280 parked a lot of times used car lots have 430 00:34:15,419 --> 00:34:21,899 wall-to-wall cars and they're stored outside and all that kind of thing and 431 00:34:19,560 --> 00:34:26,460 they can be an eyesore at times and that's why cups are required for that 432 00:34:24,240 --> 00:34:29,480 and not required for new car sales because new car sales are typically 433 00:34:28,080 --> 00:34:36,659 dealerships for this for this project I think the 434 00:34:33,300 --> 00:34:40,619 the cars are being stored inside where any product would have been stored 435 00:34:38,820 --> 00:34:46,320 inside no matter what the use is here this happens to be cars they have their 436 00:34:43,440 --> 00:34:49,379 office they store the cars inside the use permit requires the cars to be 437 00:34:48,119 --> 00:34:56,399 stored inside the question then comes 438 00:34:52,379 --> 00:35:01,500 is this use is this Auto Repair use in this area compatible and I think that's 439 00:34:59,040 --> 00:35:06,599 what the question has to come down to the parking parking is allowed on the 440 00:35:04,020 --> 00:35:10,740 streets you can park on the streets but we try to keep the required parking on 441 00:35:09,599 --> 00:35:14,880 site so the question before and the question 442 00:35:12,480 --> 00:35:21,540 the applicant the applicant is explained to us that this project can accommodate 443 00:35:17,940 --> 00:35:26,280 the employees and customers within the seven parking spaces so the question 444 00:35:24,060 --> 00:35:34,020 before the commission is whether that seven parking spaces is seems adequate 445 00:35:29,579 --> 00:35:38,099 for this business that has the product stored inside it is really what we're at 446 00:35:36,480 --> 00:35:40,160 so um 447 00:35:41,339 --> 00:35:51,380 there are uses that come in that in these lots that propose more parking 448 00:35:49,740 --> 00:35:56,880 and it just can't be done this one is is saying is this use permit 449 00:35:55,020 --> 00:36:01,560 appropriate here based on the current parking one of the one of the options 450 00:35:58,920 --> 00:36:07,140 could be no it isn't and the commission would need to make findings that that 451 00:36:03,660 --> 00:36:13,619 the parking is not sufficient for the use being proposed and tell us what 452 00:36:10,940 --> 00:36:18,420 great thank you very much and with that I will oh yes go ahead sorry all the 453 00:36:16,380 --> 00:36:24,300 parking conversations uh spurred a question if there's seven spots any of 454 00:36:22,380 --> 00:36:28,740 them required to be handicapped and I think at the site plan up there 455 00:36:26,040 --> 00:36:31,880 indicates that one of this okay I didn't see that okay thank you 456 00:36:33,240 --> 00:36:41,520 any further questions or comments yeah so in the event you get too many cars 457 00:36:39,599 --> 00:36:45,240 because you're doing well you get a bunch in things some are going to sell 458 00:36:42,780 --> 00:36:49,140 then don't sell and you can't fit them all inside what's your plan what are you 459 00:36:47,339 --> 00:36:52,380 gonna do um I don't have a plan for that because 460 00:36:50,220 --> 00:36:57,060 I don't expect that to happen so I'm not trying I have I'm the purchaser so I 461 00:36:54,599 --> 00:37:02,099 will be purchasing as needed so I will not I want all my cars inside for for to 462 00:37:00,180 --> 00:37:05,040 keep them out of the elements uh it's a better for me the whole reason I'm 463 00:37:03,420 --> 00:37:08,940 trying to do a warehouse and not your typical car lot as I feel it's a better 464 00:37:07,079 --> 00:37:14,339 experience for the customer when we have 110 Degree Days we're inside when we 465 00:37:11,099 --> 00:37:18,599 have rain like today we're inside uh I don't want to outgrow this area so 466 00:37:16,920 --> 00:37:22,619 that this is the area that I want to be in this is the the way it is right now 467 00:37:20,820 --> 00:37:30,300 is how I want it to be I'm not looking to add 50 more cars sure so uh my point 468 00:37:27,599 --> 00:37:36,240 of not letting it happen is I would not let it happen great and then if it okay 469 00:37:32,760 --> 00:37:40,800 I I trust you but beyond that is it does happen and cars are being left out is 470 00:37:38,700 --> 00:37:45,300 there any sort of repercussion behind that 471 00:37:41,940 --> 00:37:49,619 yeah so the the resolution before you would require all of the the vehicles 472 00:37:47,820 --> 00:37:52,680 for sale to be stored indoors if that starts occurring Outdoors they would be 473 00:37:51,240 --> 00:37:57,119 in violation of their conditional use permit and enforcement would occur great 474 00:37:54,960 --> 00:38:02,579 thanks any further questions 475 00:37:59,579 --> 00:38:06,240 entertain a motion Mr chair um first a quick statement I when I 476 00:38:04,680 --> 00:38:10,560 first looked at the packet and so used car dealership I went oh really but when 477 00:38:09,240 --> 00:38:13,560 I read it and I've actually been a customer of these types of businesses in 478 00:38:12,119 --> 00:38:17,160 a couple different places and it's very low-key I'm comfortable the parking will 479 00:38:15,839 --> 00:38:20,520 work and I'm also comfortable that we have controls in place that should any 480 00:38:18,660 --> 00:38:23,700 aspect of this business get out of hands and the balance of what we've talked 481 00:38:21,599 --> 00:38:28,380 about we have the ability to reel you in so to speak so I'm comfortable with that 482 00:38:25,380 --> 00:38:33,180 with that I would offer a motion that we approve conditional use permit 21 or 483 00:38:30,680 --> 00:38:38,280 23-01 permitting a luxury used car dealership 484 00:38:34,400 --> 00:38:43,140 3528 combine Street with the identified changes that were brought forward 485 00:38:39,720 --> 00:38:46,560 tonight the whereas change the change to section two on findings and then the two 486 00:38:44,880 --> 00:38:51,960 conditions of approval adding number nine and number 10. 487 00:38:49,440 --> 00:38:56,480 I have a motion by commissioner code where is there a second second 488 00:38:54,900 --> 00:39:02,240 I have a second any further discussion 489 00:38:59,760 --> 00:39:05,520 seeing none I'll call the remote commissioner Kugler 490 00:39:04,440 --> 00:39:09,720 aye commissioner Marlow hi 491 00:39:07,619 --> 00:39:12,599 commissioner Conley aye 492 00:39:10,500 --> 00:39:16,020 Mr Christensen aye 493 00:39:13,740 --> 00:39:21,300 Mr covarrubias aye chairperson Neil 494 00:39:18,480 --> 00:39:28,920 aye motion passes 6-0 thank you very much thank you everybody 495 00:39:24,839 --> 00:39:35,000 and the next item on the agenda is um conditional use permit 496 00:39:30,859 --> 00:39:35,000 22-20 P 497 00:39:35,359 --> 00:39:44,940 22-0124 applicant John L Allen for the Loyal Order of Moose a request for a 498 00:39:42,599 --> 00:39:51,359 conditional use permit to establish a private meeting facility within an 499 00:39:46,740 --> 00:39:55,859 existing building at 6 35 28th Street thank you 500 00:39:53,599 --> 00:39:58,740 thank you chairperson Neil So the applicant did provide an additional 501 00:39:57,180 --> 00:40:01,099 piece of information that I'll pass out right now 502 00:40:14,180 --> 00:40:20,760 okay Katie banister associate planner again so as you said this is a new 503 00:40:18,599 --> 00:40:24,000 location for proposed for the Moose Lodge 504 00:40:21,599 --> 00:40:27,660 here is a map of the area this is on the North End of Spring Street you can see 505 00:40:25,980 --> 00:40:31,800 an orange towards the bottom right of your screen 506 00:40:28,640 --> 00:40:36,960 the current location of the Moose Lodge there is a mixed-use project that is 507 00:40:33,900 --> 00:40:41,160 proposed and is under construction there on that site at 26th in Spring and so 508 00:40:39,720 --> 00:40:46,320 the Moose needs to find a new location so they have located this building at 509 00:40:44,099 --> 00:40:52,079 635 28th Street which is at the northwest corner of 28th and spring just 510 00:40:48,540 --> 00:40:56,820 a few blocks down the road so this project is in the Uptown Town 511 00:40:54,660 --> 00:41:02,280 Center specific plan it's in the t4f zoning District that's a mixed-use Zone 512 00:40:59,300 --> 00:41:07,740 the in that zone meeting facilities which is how staff is defining the Moose 513 00:41:04,440 --> 00:41:14,400 Lodge is a conditionally allowed use the building is about 4500 square feet in 514 00:41:11,280 --> 00:41:19,140 size parking for this use would be one parking space for every 400 square feet 515 00:41:16,440 --> 00:41:24,119 which would be 11 parking spaces here's a look at the site so in Orange 516 00:41:21,599 --> 00:41:29,880 is the building where the Moose would be located there is a a kitchen towards 517 00:41:28,079 --> 00:41:35,460 it's in the northwest corner of the building and that is proposed to be used 518 00:41:32,460 --> 00:41:39,839 as a separate use a sort of a commissary kitchen for caterers and so forth and 519 00:41:38,280 --> 00:41:45,540 we'll have some discussion about that the um as the slides progress but um and 520 00:41:43,920 --> 00:41:48,960 when we jump into conditions as well because there's a number of conditions 521 00:41:46,740 --> 00:41:52,619 related to having that separate use in the building 522 00:41:50,040 --> 00:41:56,400 the Moose Lodge does have two access points I've got them there in green 523 00:41:54,420 --> 00:42:01,320 there's sort of the main door which is at the bottom right and then there is a 524 00:41:58,079 --> 00:42:06,240 secondary egress towards the rear of the building there's a condition of approval 525 00:42:03,599 --> 00:42:10,800 that would require currently the Panic bar is not or at least a few weeks ago 526 00:42:09,180 --> 00:42:14,700 when the fire marshal and the building official and I visited the Panic bar was 527 00:42:13,140 --> 00:42:18,540 not fully functional and so that is a requirement before the Moose can get 528 00:42:16,140 --> 00:42:22,740 going that that um that that be repaired but there are two points of exit which 529 00:42:20,640 --> 00:42:25,920 is important for a an assembly use like this 530 00:42:23,820 --> 00:42:29,760 there is also an access point to that commissary kitchen currently it's a 531 00:42:27,480 --> 00:42:34,740 roll-up door which is not adequate egress for users of that kitchen so at 532 00:42:32,760 --> 00:42:40,200 the point in time when that kitchen is permitted a different type of door would 533 00:42:37,619 --> 00:42:44,040 need to be installed um we'll be discussing now you can see 534 00:42:42,060 --> 00:42:47,880 the little blue triangle excuse me Square in the bottom right hand corner 535 00:42:45,720 --> 00:42:52,800 there is an existing sign there on the site and Planning Commission will need 536 00:42:49,680 --> 00:42:56,280 to decide action on that sign um and then the whole 537 00:42:54,720 --> 00:43:00,300 um the I believe there's two properties but there's one owner for the property 538 00:42:58,260 --> 00:43:04,319 just to the north of this side it's the parking lot is oriented as if it's one 539 00:43:02,280 --> 00:43:07,859 large area so in purple there that is an auto repair use that's existing on the 540 00:43:06,420 --> 00:43:14,940 site so um the uh temporary Food Service 541 00:43:13,020 --> 00:43:19,680 which is what this food truck Court would be considered is a temporarily 542 00:43:17,400 --> 00:43:24,060 temporarily allowed use in the t4f zoning District so staff has approved a 543 00:43:21,660 --> 00:43:28,079 temporary use permit to allow a food truck court on this parking lot there's 544 00:43:26,220 --> 00:43:32,579 a lot of parking on this site there's actually 83 spaces on both properties 545 00:43:30,540 --> 00:43:37,920 both the the auto repair area and the restaurant site so a lot of parking 546 00:43:34,500 --> 00:43:42,660 spaces only 11 are required for the entire building where the moose and this 547 00:43:40,079 --> 00:43:47,940 commissary kitchen would be located the auto repair shop to the north needs five 548 00:43:44,880 --> 00:43:52,440 parking spaces 20 parking spaces would be covered by the food truck area and 549 00:43:50,400 --> 00:43:57,000 then if we pretended that those food trucks were in one enclosed building 550 00:43:54,960 --> 00:44:04,140 um which would be about 3 200 square feet that would require eight parking 551 00:43:59,099 --> 00:44:08,160 spaces so that leaves you with 39 spaces that are not required for any use that's 552 00:44:06,000 --> 00:44:13,380 proposed on site DRC was concerned about parking because there is a lot of uses 553 00:44:10,859 --> 00:44:17,460 being proposed on the site but just for information they there is adequate 554 00:44:15,300 --> 00:44:21,619 parking for what is required so that's what this slide is meant to to indicate 555 00:44:22,079 --> 00:44:28,380 so jumping into the floor plan I've rotated it so that North continues to be 556 00:44:26,400 --> 00:44:31,740 up I apologize for making it hard to read but you can see there 557 00:44:30,119 --> 00:44:35,280 um that there's the kitchen area that's not a part of the Moose Lodge lease so 558 00:44:33,780 --> 00:44:40,440 it's a separate area but within the Moose area there is a separate kitchen 559 00:44:38,579 --> 00:44:45,839 um and then they'll have pool tables and a bar area and so this is where the 560 00:44:43,680 --> 00:44:50,579 Moose will be operating as I said there are those two egress points in the Moose 561 00:44:48,300 --> 00:44:55,920 portion of the lease area and there's that kitchen area 562 00:44:53,819 --> 00:45:01,020 so here's a picture of the Moose Lodge kitchen area just for reference we've 563 00:44:58,380 --> 00:45:04,680 been working with the city Wastewater manager and the fire marshal to make 564 00:45:03,240 --> 00:45:09,839 sure that the operation of this kitchen is safe and meets all the health health 565 00:45:08,280 --> 00:45:14,400 department standards and so forth and the applicant is actively working both 566 00:45:11,819 --> 00:45:18,180 with with City staff and with the health department to make sure that they can 567 00:45:15,839 --> 00:45:23,460 meet all those codes so there is a bit of delayed maintenance 568 00:45:20,700 --> 00:45:27,540 on on the property it's um you know and not in its in its best state this was 569 00:45:25,740 --> 00:45:31,740 obviously Wilson's restaurant for many years and then the Paradise Grill 570 00:45:28,859 --> 00:45:34,380 operated here for about five years um 571 00:45:32,579 --> 00:45:39,420 here's some additional pictures the Landscaping is in need of a facelift the 572 00:45:37,619 --> 00:45:42,839 building itself and these are a few weeks ago I haven't been by in the last 573 00:45:41,040 --> 00:45:46,079 few days so I'm not sure if any painting has occurred but 574 00:45:44,220 --> 00:45:51,300 um you know we're still seeing remnants from the previous signage 575 00:45:48,000 --> 00:45:54,599 um a very bold stripe at the top a green and orange 576 00:45:52,280 --> 00:45:58,560 colors so there are conditions of approval that would require the building 577 00:45:56,160 --> 00:46:02,040 to be repainted in some sort of an Earth Tone palette 578 00:46:00,060 --> 00:46:06,839 um or more traditional for a commercial project 579 00:46:04,440 --> 00:46:10,500 this is from looking at from the alley looking towards the the Moose Lodge 580 00:46:08,880 --> 00:46:12,680 building and that auto repair use as well 581 00:46:13,079 --> 00:46:20,220 there is a sign at the corner of the property it's an unusual sign it's about 582 00:46:18,060 --> 00:46:24,000 six feet tall and the potato sign bases are approximately five feet by five feet 583 00:46:22,140 --> 00:46:30,300 so about 25 square feet on each side there are four sides to this sign which 584 00:46:27,240 --> 00:46:34,680 as I said is a bit unusual the applicant has provided some sort of options for 585 00:46:32,220 --> 00:46:39,480 how that sign might be reused staff is recommending that instead of refacing 586 00:46:36,780 --> 00:46:42,780 this sign um you know that this a monument sign is is certainly possible 587 00:46:41,339 --> 00:46:47,819 here but it needs to be a sign that complies with the Uptown Town Center 588 00:46:44,819 --> 00:46:52,319 specific plan and the sign ordinance so standards for that would be six foot 589 00:46:49,920 --> 00:46:57,240 maximum height but only 32 square feet in sign area when we look at any 590 00:46:54,920 --> 00:47:00,359 freestanding sign we don't if you know in a traditional freestanding sign you 591 00:46:58,859 --> 00:47:03,359 would have basically two sides you know like North and South whereas this one 592 00:47:01,800 --> 00:47:08,339 has the four sides um for a traditional side we if one side 593 00:47:05,940 --> 00:47:13,800 is 32 square feet we would not count the additional reverse side as sign area 594 00:47:11,099 --> 00:47:17,940 that would count as 32 square feet as I said what we're looking at is a sign 595 00:47:15,359 --> 00:47:21,839 with approximately 100 it's 25 square feet on each side which would be 596 00:47:19,920 --> 00:47:26,579 approximately you know we've got two times that it would be approximately 50 597 00:47:24,060 --> 00:47:30,480 square feet so the municipal code does not allow non-conforming sides to be 598 00:47:28,500 --> 00:47:34,380 altered to change the signed copy unless the sign is made to comply with the 599 00:47:31,980 --> 00:47:37,740 provisions of the sign ordinance in addition the sign ordinance also allows 600 00:47:36,240 --> 00:47:42,540 the Planning Commission to impose conditions to require than any existing 601 00:47:40,160 --> 00:47:47,640 incompatible or non-conforming signs be removed and brought into conformance so 602 00:47:45,000 --> 00:47:53,760 um the CR the the draft solution actually I omitted the the condition 603 00:47:50,839 --> 00:47:57,359 inadvertently so I've got a a slide to show you what would be proposed but 604 00:47:55,619 --> 00:48:01,640 staff is proposing that this sign be brought into conformance to be reduced 605 00:47:59,400 --> 00:48:06,420 in size and uh and possibly removed and replaced or 606 00:48:04,319 --> 00:48:12,180 redesigned depending on Planning Commission guidance and ultimately DRC 607 00:48:09,060 --> 00:48:15,079 guidance as well when we get a compliant sign proposed 608 00:48:15,240 --> 00:48:22,140 um as I said I showed in some of the previous sites the Landscaping is um 609 00:48:19,260 --> 00:48:26,060 needs an uplift and so we do have a landscape plan proposed 610 00:48:23,760 --> 00:48:31,339 um which would put new uh landscape plantings within all of the existing 611 00:48:28,319 --> 00:48:31,339 planter areas 612 00:48:32,460 --> 00:48:38,579 so jumping into the conditions of approval I've color-coded those that 613 00:48:36,720 --> 00:48:43,500 really pertain more to the Moose Lodge and then and those are the black colored 614 00:48:40,859 --> 00:48:47,640 conditions and then those in red that really have more to do with the 615 00:48:45,060 --> 00:48:51,480 potential for a commissary kitchen um and so the Moose they need to make 616 00:48:49,619 --> 00:48:55,380 sure they provide that proper egos as we discussed they need to repaint the 617 00:48:52,980 --> 00:49:00,240 building and install Landscaping any future signs for the Moose would need to 618 00:48:57,720 --> 00:49:05,579 go through DRC review we don't have any signs proposed for the Moose at this 619 00:49:01,920 --> 00:49:09,119 time looking at the potential for a commissary kitchen I think one of the 620 00:49:07,020 --> 00:49:15,540 most important things is that there is currently a temporary use permit for the 621 00:49:12,359 --> 00:49:18,180 um for the food truck court and um 622 00:49:16,380 --> 00:49:22,859 so that temporary use permit would need to be amended so a standalone commissary 623 00:49:21,000 --> 00:49:26,940 kitchen where there's not any sort of food service we would consider to be a 624 00:49:24,660 --> 00:49:30,780 food and Kindred products which is more of like a manufacturing type use that's 625 00:49:29,099 --> 00:49:34,680 not actually a use that's allowed in the t4f zoning district and so staff is 626 00:49:32,819 --> 00:49:39,180 recommending that the commissary kitchen be allowed as a part of that temporary 627 00:49:37,079 --> 00:49:43,560 use permit the Food Service portion would be the food trucks and the um the 628 00:49:41,880 --> 00:49:48,359 commissary kitchen would be to to support those food trucks and so the tup 629 00:49:46,079 --> 00:49:52,800 would need to be amended in order to account for that commissary kitchen and 630 00:49:50,460 --> 00:49:57,300 any signage that um that is proposed so that's condition number 11 and then 631 00:49:55,079 --> 00:50:02,339 there's a series of health and safety requirements for the um that commissary 632 00:50:00,180 --> 00:50:05,640 kitchen including a grease Interceptor Health Department kit um Department 633 00:50:04,200 --> 00:50:09,480 permits um the the 634 00:50:07,520 --> 00:50:13,020 applicant for the commissary kitchen will need to seek a building permit to 635 00:50:11,099 --> 00:50:18,180 provide adequate separation between the moose and that kitchen to make sure that 636 00:50:15,300 --> 00:50:21,480 if there was ever a fire in the um in the commissary kitchen it wouldn't 637 00:50:19,319 --> 00:50:25,020 spread to the Moose area the document that you were given this evening 638 00:50:22,740 --> 00:50:28,500 indicates that the the fire suppression systems for the two different kitchens 639 00:50:26,579 --> 00:50:32,760 are actually separate so it sounds like one of the conditions there um the kind 640 00:50:30,420 --> 00:50:35,640 of Part B on number nine is is already addressed so that it sounds like they 641 00:50:34,079 --> 00:50:39,780 already have separate fire suppression systems but the condition is there to 642 00:50:37,440 --> 00:50:44,160 make sure that our our fire marshal is able to confirm and make sure that those 643 00:50:41,700 --> 00:50:46,700 that separate fire suppression is is provided 644 00:50:47,040 --> 00:50:52,619 um staff is recommending to add two additional conditions related to the 645 00:50:50,339 --> 00:50:56,280 freestanding sign the first is that the precinct before the freestanding sign 646 00:50:54,180 --> 00:51:00,839 can be used it needs to be brought into conformance with the science standards 647 00:50:57,780 --> 00:51:04,020 and it would be subject to DRC review um the sign is actually 648 00:51:02,280 --> 00:51:09,780 um very close to being what's considered abandoned by the sign ordinance and if a 649 00:51:06,780 --> 00:51:13,619 sign is not used for 180 days it needs to be removed it's considered an 650 00:51:11,220 --> 00:51:18,960 abandoned sign so I've got the date there March 31st would be 180 days 651 00:51:15,900 --> 00:51:25,200 according to Social Media The Paradise Grill stopped operations on October the 652 00:51:21,839 --> 00:51:30,480 2nd of last year which so 180 days would be March 31st so um the recommended 653 00:51:28,559 --> 00:51:34,380 condition would be that if we don't get an application to even consider bringing 654 00:51:32,760 --> 00:51:39,420 the sign into conformance um before night March 31st that sign 655 00:51:36,839 --> 00:51:43,440 would just need to be removed but based on that section of the code that you see 656 00:51:41,280 --> 00:51:47,400 there so um with all conditional use permits 657 00:51:45,960 --> 00:51:49,859 the Planning Commission has to make a series of findings in order to approve 658 00:51:49,079 --> 00:51:53,640 it um so basically you're looking to find 659 00:51:51,300 --> 00:51:57,720 that the um that the use is compatible with the neighborhood I checked in with 660 00:51:55,619 --> 00:52:00,900 our our Police Department to find out if they've had trouble with the Moose Lodge 661 00:51:59,160 --> 00:52:04,920 over the years they've been operating at their site on 26th Street for many years 662 00:52:02,880 --> 00:52:08,640 and the police department was very pleased to find that they would be 663 00:52:06,300 --> 00:52:11,760 replacing Paradise Grill which was a use that they had had some trouble with over 664 00:52:10,260 --> 00:52:15,359 the years so um the police department was very 665 00:52:13,980 --> 00:52:19,140 comfortable with the Moose coming to this location there are some residences 666 00:52:17,160 --> 00:52:23,280 that are just you know immediately adjacent to the site so um I thought 667 00:52:21,240 --> 00:52:27,420 that was a good sign that the police department was encouraged the Planning 668 00:52:26,280 --> 00:52:30,480 Commission has to make a series of findings though that basically that this 669 00:52:29,220 --> 00:52:34,020 project is compatible with the neighborhood that it's not detrimental 670 00:52:32,040 --> 00:52:38,819 to our efforts to revitalize our downtown and then that the pro the 671 00:52:36,240 --> 00:52:43,800 proposed land use is compatible with our plans and policies that we have adopted 672 00:52:41,400 --> 00:52:48,540 here in the city so staff uh the you also need to make a 673 00:52:46,980 --> 00:52:52,079 secret determination and that the recommended determination is that this 674 00:52:50,280 --> 00:52:56,220 is a Class one exemption from the California Environmental Quality act and 675 00:52:53,760 --> 00:53:00,300 that's included in your draft resolution so as always the Planning Commission has 676 00:52:58,200 --> 00:53:04,800 options the first would be to approve the draft resolution to approve that the 677 00:53:03,000 --> 00:53:09,839 conditional use permit you could modify and approve 678 00:53:06,140 --> 00:53:14,339 the resolution and and staff has provided some recommended modifications 679 00:53:12,180 --> 00:53:17,460 and then if the Planning Commission wants to deny the conditional use permit 680 00:53:16,140 --> 00:53:21,119 you would need to make findings of denial 681 00:53:18,960 --> 00:53:23,940 staff's recommendation is to approve the the 682 00:53:22,140 --> 00:53:29,220 um the project to approve the draft resolution as I said we do have a couple 683 00:53:25,980 --> 00:53:33,119 of amendments to to recommend but staff is recommending approval of the project 684 00:53:30,900 --> 00:53:37,740 I believe that is the end of my report thank you 685 00:53:34,920 --> 00:53:41,640 great thank you Katie um this time we usually open it up to the applicant for 686 00:53:39,900 --> 00:53:45,180 comments it says the applicant wish to come up and make comments if they do 687 00:53:43,380 --> 00:53:47,359 please state your name and address thank you 688 00:53:50,339 --> 00:53:52,819 hello 689 00:53:53,579 --> 00:54:00,119 um you just want an opening from um what I do have is excuse me name and 690 00:53:58,680 --> 00:54:03,599 address please pardon me oh I'm John Allen um 691 00:54:01,920 --> 00:54:09,240 I'm the administrator of the Moose Lodge so all right thank you one of the items 692 00:54:06,180 --> 00:54:14,040 was talked about is the grease um Spencer 693 00:54:11,420 --> 00:54:21,540 get my glasses I can't read my own notes Interceptor uh in in scepter we have 694 00:54:18,180 --> 00:54:27,780 ordered it I have the bill here um Brian and Patty from I think Water 695 00:54:24,900 --> 00:54:33,180 waste management came by on site Friday I believe it was 696 00:54:29,940 --> 00:54:37,440 um Brian was happy with what he saw I have a couple I have a few pictures if 697 00:54:35,460 --> 00:54:41,700 you're interested in seeing you with the three the three sinks and where that's 698 00:54:39,059 --> 00:54:47,220 going to be but if not Brian Brian's biggest concern was 699 00:54:43,440 --> 00:54:50,579 having the grease get moved away from the hot water and where we told him it 700 00:54:49,079 --> 00:54:57,780 was going to be he was fine with that and he said just go ahead and get it the 701 00:54:55,140 --> 00:55:03,420 triple grease is well known around here and and respected and Brian knew him and 702 00:55:00,240 --> 00:55:08,599 they do the kind of work they do so that should be in 703 00:55:04,859 --> 00:55:08,599 maybe by the end of this week 704 00:55:12,180 --> 00:55:16,880 anything else um 705 00:55:18,359 --> 00:55:25,020 well I was pleased um being a retired police officer from Arroyo Grande after 706 00:55:23,040 --> 00:55:29,760 31 years and the moose was in that existing building or their established 707 00:55:27,960 --> 00:55:32,700 in 1980 that the police department had any nothing negative 708 00:55:31,680 --> 00:55:37,079 um the three years I've been an administrator I enforce any problems 709 00:55:35,579 --> 00:55:40,200 that we might have not only be to somebody maybe using foul language or 710 00:55:38,760 --> 00:55:44,819 something I can suspend their membership for a couple weeks and that hurts them 711 00:55:41,760 --> 00:55:48,720 more than maybe even get arrested so we we are we we police our own people and 712 00:55:47,400 --> 00:55:54,359 we don't we're not a rowdy crowd sometimes I explain when the Battalion 713 00:55:51,300 --> 00:55:58,980 the fire chief for Italian chief came over and talked about having two entries 714 00:55:57,180 --> 00:56:02,220 and exits and I said well most of our people if we had a fire that had to get 715 00:56:01,020 --> 00:56:07,200 their Wheelchairs and start moving themselves out so we have more of a 716 00:56:04,380 --> 00:56:12,740 senior crowd we're trying to get some youth in there but right now they're all 717 00:56:09,420 --> 00:56:16,740 about my age you know 35 40. so and and 718 00:56:14,700 --> 00:56:21,480 just a follow-up what are the typical hours of the the most 719 00:56:19,319 --> 00:56:24,960 um we open right now we and it's been the hours we're not going to change them 720 00:56:22,800 --> 00:56:30,540 we open at 11 A.M Monday through Saturday and we're scheduled to close at 721 00:56:28,020 --> 00:56:34,380 8 but sometimes it's slow and they get out seven o'clock 722 00:56:32,640 --> 00:56:39,599 um and that but eight o'clock is our closing time and then if we do have like 723 00:56:36,780 --> 00:56:44,280 you know a New Year's Eve party I always use East Coast time so at nine o'clock 724 00:56:42,359 --> 00:56:49,319 is our 12 o'clock so we're you know we're not staying out till midnight 725 00:56:45,780 --> 00:56:54,420 causing you know loud noises and stuff um on Sundays we do um have breakfast so 726 00:56:52,500 --> 00:56:57,559 we open up at nine in the morning and we close at 7 pm 727 00:56:57,720 --> 00:57:05,339 great thank you with that I'll open it up to questions from the commission 728 00:57:02,700 --> 00:57:08,579 commissioner kogler a few questions of staff 729 00:57:06,720 --> 00:57:11,300 the food truck operation has that ever really operated 730 00:57:14,880 --> 00:57:20,460 as far as we are aware no it is not okay so it's permitted that it hasn't 731 00:57:18,660 --> 00:57:23,760 happened who owns is it the owner of the property that has the food truck 732 00:57:21,780 --> 00:57:28,040 operation or is it yet an independent operator the applicant for that to up 733 00:57:25,920 --> 00:57:34,200 was the owner of of the property okay and you've talked about adding in the 734 00:57:31,920 --> 00:57:37,980 sale of on-site food as part of the essentially food truck approved kind of 735 00:57:36,119 --> 00:57:43,140 merging those two food truck approval though was a staff was it not so would 736 00:57:41,040 --> 00:57:46,020 the addition of the on-site sale of food be a staff function or a Planning 737 00:57:44,460 --> 00:57:48,200 Commission function so 738 00:57:48,420 --> 00:57:54,720 license is for the Planning Commission so 739 00:57:52,619 --> 00:58:00,180 um when we we actually have received an application for this for the commissary 740 00:57:56,460 --> 00:58:03,599 kitchen which it would not include on its own sort of on-site sales but with 741 00:58:01,980 --> 00:58:07,319 the food truck Court there is that link where there would be you know on-site 742 00:58:05,400 --> 00:58:10,740 sales of food and so stats recommendation is that we would allow it 743 00:58:08,760 --> 00:58:14,880 because of the food court but it would need to be tied to the food truck court 744 00:58:12,720 --> 00:58:19,920 but you know that's an interpretation that we're making and certainly Planning 745 00:58:16,319 --> 00:58:24,240 Commission could weigh in on that okay um 746 00:58:21,240 --> 00:58:26,700 going to the freestanding sign or freestanding signs allowed in the 747 00:58:26,040 --> 00:58:31,800 district yes they are okay and up to what height 748 00:58:28,980 --> 00:58:35,160 six feet okay that's one and this one is at six feet if I remember the black I 749 00:58:33,960 --> 00:58:38,420 did not go out and measure it but it's approximately six feet I could certainly 750 00:58:37,140 --> 00:58:43,140 um but there's no record that that was ever 751 00:58:40,799 --> 00:58:45,260 permitted or approved I could not find a record 752 00:58:45,540 --> 00:58:48,859 aerial photographs and and 753 00:58:48,960 --> 00:58:53,700 always there but those don't go back far enough to really 754 00:58:52,140 --> 00:58:59,940 say but I could not find a building permit nor a planning entitlement for it 755 00:58:57,240 --> 00:59:03,780 okay and the conditions of the approval that's been already put forward by staff 756 00:59:01,500 --> 00:59:07,140 for the food truck operation only allows food trucks to be there during the time 757 00:59:05,400 --> 00:59:11,819 of service is that correct or not to be parked on site I believe that's correct 758 00:59:09,480 --> 00:59:16,440 correct okay there is as your conditions slide showed one either dead food truck 759 00:59:14,700 --> 00:59:20,940 or food truck wannabe I'm not sure which parked on the site right now I showed up 760 00:59:18,960 --> 00:59:25,339 in your one photo and so I take it that would be cleared away so there is a 761 00:59:23,220 --> 00:59:25,339 future 762 00:59:28,380 --> 00:59:34,680 single food truck I believe they have a business license to operate there kind 763 00:59:33,119 --> 00:59:38,760 of independently from the rest of it I don't know I believe the owners here 764 00:59:36,359 --> 00:59:41,760 this evening and could comment on whether or not that food truck will 765 00:59:40,140 --> 00:59:46,079 remain once the food truck court gets going okay it would appear to be on the 766 00:59:44,160 --> 00:59:49,859 Moose site if I'm interpreting where the lines are okay that's all I have for 767 00:59:47,640 --> 00:59:55,500 right now thank you commissioner cover rubies thank you sir 768 00:59:53,520 --> 01:00:00,780 so Katie just clarity we are here approving the condition use 769 00:59:58,319 --> 01:00:05,339 permit for the Moose Lodge sounds like the food court portion of this has 770 01:00:03,000 --> 01:00:10,380 already been approved by staff that is correct so the way the design of 771 01:00:07,740 --> 01:00:14,059 the food court the layout all of that stuff has all been handled already 772 01:00:12,900 --> 01:00:19,260 correct yeah it's been approved as it's shown in your 773 01:00:16,380 --> 01:00:23,520 as it's shown okay in the report it mentions a lot about 774 01:00:21,420 --> 01:00:28,260 deferred maintenance was there a building inspection done do you know 775 01:00:26,160 --> 01:00:31,200 um the building official has been on the site and there are conditions of 776 01:00:29,880 --> 01:00:34,619 approval that would require certain things to be permitted but most of the 777 01:00:33,119 --> 01:00:38,819 Deferred maintenance that I'm referring to is is more cosmetic to the outside of 778 01:00:36,780 --> 01:00:43,799 the building yeah I remember the building well Wilson's restaurant for 779 01:00:40,619 --> 01:00:47,940 gosh 30 plus years probably not longer yeah yeah I'm glad to see something's 780 01:00:46,140 --> 01:00:52,319 going to go in there finally hopefully that's permanent in the long term 781 01:00:50,520 --> 01:00:54,839 um okay um 782 01:00:53,040 --> 01:00:57,359 commissioner kobler already addressed my sign question let me make sure there's 783 01:00:56,160 --> 01:01:00,960 nothing else you know what I'll pass it on to other questions until I finish 784 01:00:59,099 --> 01:01:04,099 reading my other stuff commissioner Christensen 785 01:01:05,940 --> 01:01:13,380 uh just a couple clarification questions Katie uh building signage we talked 786 01:01:11,460 --> 01:01:16,859 about the sign out by the street is there building signage and 787 01:01:15,780 --> 01:01:22,200 um is there certain lighting requirements for that for that type of 788 01:01:18,420 --> 01:01:26,099 zone so the the Moose has not um propells at this 789 01:01:24,599 --> 01:01:31,200 this choir at that point in time when they do want to put up signage they 790 01:01:28,020 --> 01:01:35,099 would have to come for DRC review okay um 791 01:01:33,240 --> 01:01:40,200 commissary kitchen that's not necessarily are we approving that 792 01:01:37,440 --> 01:01:45,020 tonight I mean the the concept of that space I guess I'm a little confused on 793 01:01:41,940 --> 01:01:45,020 that part of it no 794 01:01:47,520 --> 01:01:54,119 no operate safely safely so we're allowing the moose and we're saying the 795 01:01:52,079 --> 01:01:57,000 Moose can operate here but if somebody wants to go in this kitchen in the 796 01:01:55,559 --> 01:02:00,720 future they've got to do these things to keep the Moose safe okay I mean I like 797 01:01:59,339 --> 01:02:05,760 both so um and and when I was looking at the 798 01:02:02,460 --> 01:02:10,380 parking uh number diagram so the Moose Lodge has in their lease access to all 799 01:02:08,220 --> 01:02:15,059 that parking that's left over from the food court other than say five for the 800 01:02:12,660 --> 01:02:18,299 automotive repair yes and we do have an email it's one of the attachments to 801 01:02:16,559 --> 01:02:22,020 your staff report that you know when the auto repair is not in use or the spaces 802 01:02:20,040 --> 01:02:25,200 that the auto repair doesn't use um they you know the Moose can use the 803 01:02:23,700 --> 01:02:28,380 spaces that are over there near the auto repair okay 804 01:02:27,180 --> 01:02:33,420 um I think that's the only questions I have at this moment 805 01:02:31,020 --> 01:02:37,260 commissioner Conley uh yeah similar to Christians and 806 01:02:35,579 --> 01:02:40,680 commissioner Christians and I was I was a little confused about the kitchen is 807 01:02:38,700 --> 01:02:45,480 the kitchen going to be used by both the foods court and 808 01:02:42,540 --> 01:02:49,160 and the Moose Lodge so I have dual usage no there's actually two kitchens 809 01:02:52,680 --> 01:02:57,720 they would order stuff and then there was more of an involved kitchen towards 810 01:02:55,920 --> 01:03:01,260 the rear and so the Moose will have their own kitchen that was the picture 811 01:02:58,920 --> 01:03:05,520 we saw with the orange the vibrant orange tiles that's the kitchen that the 812 01:03:03,299 --> 01:03:09,960 Moose will use there is a separate kitchen that needs to be more officially 813 01:03:07,619 --> 01:03:14,760 separated off but it would be used as a commissary kitchen for for food trucks 814 01:03:12,119 --> 01:03:19,559 and Caterers so my concern is would there be a conflict abuse in that space 815 01:03:18,000 --> 01:03:23,579 and I guess with two separate kitchens as 816 01:03:22,440 --> 01:03:26,579 long as that's as long as everyone knows their 817 01:03:25,319 --> 01:03:30,599 boundaries that there wouldn't be a conflict 818 01:03:28,319 --> 01:03:33,540 between the two so there is a requirement recognition of approval that 819 01:03:31,980 --> 01:03:37,260 will requires that the spaces spaces be given proper separation to 820 01:03:35,940 --> 01:03:41,400 make sure there's no like fire spread and so and so forth but as far as I'm 821 01:03:39,540 --> 01:03:46,740 understanding the the owner intends to to lease them as two separately spaces 822 01:03:44,220 --> 01:03:50,819 two separate tenant spaces yeah and the conditions would require that that 823 01:03:47,880 --> 01:03:54,780 occurs in a safe manner thank you yeah 824 01:03:51,839 --> 01:03:59,640 um so with that separation of space is that wall there fire rated or is there 825 01:03:57,780 --> 01:04:03,780 plans to make the separation between the kitchen spaces fire rated so at this 826 01:04:02,160 --> 01:04:07,020 point in time my understanding is it is not fire rated so the condition of 827 01:04:05,400 --> 01:04:11,040 approval is that before commissary kitchen can operate there they um you 828 01:04:09,420 --> 01:04:13,859 know they're not going to be able to get health department clearance building 829 01:04:12,119 --> 01:04:16,200 department you know there's there's they need to work with the building 830 01:04:14,700 --> 01:04:19,619 department to determine what the appropriate separation is and so our 831 01:04:17,940 --> 01:04:23,940 building department um will help to to you know make that 832 01:04:21,540 --> 01:04:27,299 those requirements I suspect it would require a fire rated wall but I don't 833 01:04:25,619 --> 01:04:31,559 know what all the the um the building official will ensure that the the code 834 01:04:29,160 --> 01:04:38,339 requirements are are enforced sure and then how much cooking is the the Moose 835 01:04:36,200 --> 01:04:41,640 organization going to be doing in there and what are you cooking and how many 836 01:04:40,140 --> 01:04:45,900 people are you cooking for and do you sell the food like what's the what's the 837 01:04:44,099 --> 01:04:48,660 plan for the kitchen I guess I should have prepared more for an opening 838 01:04:47,220 --> 01:04:53,460 statement this first time I've ever been to a Planning Commission so me too I can 839 01:04:51,240 --> 01:04:59,760 just back up a little bit we're we're a prize got it 840 01:04:56,040 --> 01:05:03,660 um we're a private fraternity and so to be to get into the building you have to 841 01:05:01,980 --> 01:05:07,260 have a card and swipe it and then the door will buzz open 842 01:05:05,280 --> 01:05:10,740 um to leave you just hit the bar just like you know the bar at the door and 843 01:05:09,180 --> 01:05:15,059 you can you can get out just like any door 844 01:05:11,819 --> 01:05:19,799 um the kitchen is pretty limited in our use because on Sundays we do breakfast 845 01:05:17,400 --> 01:05:24,540 so I'll say for sure on Sundays we do it and then dinners are just kind of Hit 846 01:05:21,660 --> 01:05:27,660 and Miss if somebody wants to volunteer to do a Friday night Thursday night or 847 01:05:26,160 --> 01:05:32,579 whatever you know like something we were doing a taco Tuesdays and hamburger 848 01:05:29,339 --> 01:05:36,020 Wednesdays or whatever but um but it's just limited to the membership and 849 01:05:35,099 --> 01:05:42,599 probably uh on a average night we sell 20 meals 850 01:05:40,140 --> 01:05:47,339 so 20 hamburgers 20 tacos something like that so it's not a high volume and 851 01:05:44,880 --> 01:05:52,799 everything is all the stuff is countertop they're all we've bought 852 01:05:48,720 --> 01:05:58,020 brand new stuff and um so separating that kitchen in our kitchen 853 01:05:54,660 --> 01:06:04,079 is night and day yeah yeah and and it's volunteers that cook yes okay great and 854 01:06:00,720 --> 01:06:08,760 then uh with the signage the site signage I guess this would be for staff 855 01:06:05,940 --> 01:06:13,859 is is it currently lit and are there requirements for lighting out out on a 856 01:06:11,520 --> 01:06:17,339 sign out like that my understanding is that it is not 857 01:06:15,660 --> 01:06:20,400 currently lit although there is it looks like some sort of conduit that goes up 858 01:06:18,900 --> 01:06:25,559 down the middle so it's possible there's electricity out there signs are not 859 01:06:22,380 --> 01:06:30,420 required to be lit but but um there are um you can light them the the specific 860 01:06:27,900 --> 01:06:34,559 plan prefers external elimination like a bulb shining on the sign instead of like 861 01:06:32,099 --> 01:06:39,240 a um like a hand sign or something like that so this what you're seeing here is 862 01:06:36,660 --> 01:06:43,319 just the the I don't even know what to call it I it's like the remnants like 863 01:06:41,700 --> 01:06:46,799 almost like the dirt that was behind the sign it's not this I'm not even sure 864 01:06:44,940 --> 01:06:50,900 that that's paint it might be but um that's left over from from Paradise 865 01:06:48,839 --> 01:06:55,740 Grill and I think even from Wilson's understood and then um with the 866 01:06:53,520 --> 01:07:00,599 irrigation upgrade or the Landscaping upgrade uh are there irrigation upgrades 867 01:06:58,619 --> 01:07:03,839 going to be going with that do do you guys plan on doing excavation and 868 01:07:02,400 --> 01:07:08,280 trenching through the site to accommodate upgraded irrigation system 869 01:07:06,539 --> 01:07:12,660 so I was informed that there is irrigation or you know lines leading to 870 01:07:10,920 --> 01:07:17,520 enchanters and so yeah so you need to install you know in 871 01:07:13,980 --> 01:07:22,079 meters and more irrigation equipment but I don't believe it's going to require 872 01:07:18,539 --> 01:07:25,440 trenching okay and then does does your organization do you guys do outdoor 873 01:07:24,059 --> 01:07:29,940 activities are you planning on being outside obviously it sounds like a lot 874 01:07:27,720 --> 01:07:33,539 of people are leaving way early in the evening so yeah just 875 01:07:31,920 --> 01:07:37,319 um the three years I've been administrating we haven't done anything 876 01:07:34,920 --> 01:07:42,660 outside but in past years I've heard they've had a few things where we you 877 01:07:39,420 --> 01:07:46,740 know get a a one day permit um but I don't know all the ins and outs 878 01:07:44,220 --> 01:07:49,799 and that but right now there's no plans I'm just trying to get in there and 879 01:07:48,119 --> 01:07:56,460 start making some money so I can pay that guy back there so yeah I just got a 880 01:07:53,819 --> 01:07:59,819 two more if the sign is removed because it is abandoned 881 01:07:57,960 --> 01:08:03,480 what's the requirement for them to put it back in or 882 01:08:01,920 --> 01:08:06,839 so my understanding is the owner would like to use that to advertise the food 883 01:08:05,160 --> 01:08:09,839 truck Court Just for information it wouldn't be used for the Moose but if 884 01:08:08,640 --> 01:08:13,740 they wanted to um to uh 885 01:08:11,579 --> 01:08:16,679 yeah to put in the sign they would need to first get approval from the 886 01:08:15,119 --> 01:08:19,500 development Review Committee which is of course the subcommittee of the Planning 887 01:08:18,060 --> 01:08:22,920 Commission and then they would need a building permit for that yeah and but if 888 01:08:21,540 --> 01:08:26,219 it got abandoned they would just have to go through that again 889 01:08:24,140 --> 01:08:30,359 right they would need to remove this sign and then they could start over it 890 01:08:27,839 --> 01:08:33,719 with a more compliant sign great and the only last one is how long were you guys 891 01:08:31,679 --> 01:08:37,980 in the last location now uh what was the question how long 892 01:08:35,699 --> 01:08:40,859 were you in the last location um 893 01:08:39,000 --> 01:08:46,080 in 1980 they were right across the street but then shortly thereafter they 894 01:08:42,420 --> 01:08:51,239 moved over so 81-82 cool and and on science I told Katie we really don't 895 01:08:48,120 --> 01:08:55,739 plan on a sign right now because we're not really advertising for the public to 896 01:08:53,100 --> 01:09:00,480 come in and anybody that gets on the on the Moose site they can see where the 897 01:08:58,140 --> 01:09:04,279 address is and then they show up yeah great thank you that's all I had 898 01:09:05,759 --> 01:09:11,520 any additional questions with that this is a public comment I 899 01:09:09,779 --> 01:09:15,679 will open it up for public comment is there anybody that would like to speak 900 01:09:13,020 --> 01:09:15,679 to this item 901 01:09:17,699 --> 01:09:24,299 Marcy anybody online no callers seeing that I will close public comment 902 01:09:22,679 --> 01:09:30,299 and bring it back to the commission for further discussion and or a motion 903 01:09:28,020 --> 01:09:33,960 commissioner um on the discussion front I guess I was 904 01:09:32,040 --> 01:09:37,319 on the DRC when this was reviewed and I do support the use at this site I think 905 01:09:36,000 --> 01:09:42,299 it makes a lot of sense there were a number of details that we talked about 906 01:09:38,819 --> 01:09:46,739 at DRC many of which are addressed tonight or have been addressed I think 907 01:09:44,100 --> 01:09:50,759 I'm satisfied with those descriptions and explanations to how the business 908 01:09:48,299 --> 01:09:55,279 will be run so I think it works and I I certainly support bringing the sign into 909 01:09:52,620 --> 01:09:55,279 compliance 910 01:09:56,100 --> 01:10:03,420 commissioner Cooper rubies no I'll let go that I think that again 911 01:10:00,840 --> 01:10:08,340 that building's been there forever and it needs a lot of TLC 912 01:10:06,120 --> 01:10:13,020 um to get it to get it more respectable and looking good and I'm happy to hear 913 01:10:10,280 --> 01:10:15,840 uh somebody's gonna occupy it and take care of it little surprise and I get the 914 01:10:14,820 --> 01:10:19,140 theory why you're not going to put a sign on there 915 01:10:16,980 --> 01:10:24,120 um I get it it's not a not intended for public uh use it's more of a membership 916 01:10:22,020 --> 01:10:28,380 based use I've been in the Moose Lodge a couple times as a guest 917 01:10:26,040 --> 01:10:32,040 um just and so I'm just happy to hear that um this this building's finally 918 01:10:30,840 --> 01:10:36,780 going to be used for something I hopefully long term so I would be in 919 01:10:34,860 --> 01:10:40,620 complete support commissioner Christensen 920 01:10:39,000 --> 01:10:43,440 yeah I would Echo the comments of the other Commissioners I'm also happy about 921 01:10:42,000 --> 01:10:49,260 the commissary kitchen I think that there is a large use for that in our 922 01:10:46,260 --> 01:10:53,460 town so I think that you'll that will be a benefit to have that ability and I I'm 923 01:10:51,840 --> 01:10:56,780 glad that the Moose Lodge has found a new home so thank you 924 01:10:57,239 --> 01:11:03,600 commissioner Conley yeah I think this is a good use I would 925 01:11:02,280 --> 01:11:07,560 support it um with regard to the sign it seems to 926 01:11:05,580 --> 01:11:13,860 me that the Moose Lodge isn't interested in the sign if it becomes abandoned then 927 01:11:10,800 --> 01:11:18,300 it seems like the food court is or the food trucks would be the interested 928 01:11:15,540 --> 01:11:22,080 party and it would be them that would come forward with a sign propose what a 929 01:11:20,940 --> 01:11:26,179 future day so if I I would support this 930 01:11:26,400 --> 01:11:34,140 commissioner Marlon yep I I support this it's be nice to get someone in there 931 01:11:32,400 --> 01:11:38,340 so with all that support is there a motion this evening sure 932 01:11:35,760 --> 01:11:42,420 uh I would make a motion I would make move the Planning Commission approve 933 01:11:39,659 --> 01:11:49,440 conditional use permit 22-20 permitting private meeting facility 635 28th Street 934 01:11:45,679 --> 01:11:56,040 with the additions of conditions 15 and 16 that were outlined by staff 935 01:11:52,860 --> 01:12:00,600 I have a motion there's no second then I have a motion by commissioner kogler 936 01:11:58,500 --> 01:12:03,739 in a second by commissioner Christensen any further comment 937 01:12:04,020 --> 01:12:12,480 roll call please commissioner kogler aye commissioner Christensen aye Mr Connolly 938 01:12:10,260 --> 01:12:19,520 aye commissioner Marlow aye commissioner cover rubius aye chairperson Neal 939 01:12:15,420 --> 01:12:19,520 aye motion passes 6-0 940 01:12:20,040 --> 01:12:26,280 for the next item um I work for the general contractor 941 01:12:23,460 --> 01:12:30,659 that is working with the um Hope Family wines to build this project 942 01:12:28,739 --> 01:12:38,400 so I will have to step down from this project and put to work our newly minted 943 01:12:34,920 --> 01:12:41,780 Vice chair so don't forget to come get me why thank you so much 944 01:12:43,159 --> 01:12:50,000 okay well I guess we'll uh we'll hear the presentation from staff 945 01:12:56,159 --> 01:13:05,219 yes Mr chairman members of the commission this is the Triana Winery 946 01:13:01,199 --> 01:13:10,739 Expansion Project uh it's at 42 82nd winway so this is out 947 01:13:07,800 --> 01:13:15,360 uh on Dry Creek Road off of Dry Creek Road so this would be east of Airport 948 01:13:13,260 --> 01:13:21,480 Road at Dry Creek Road and North side of Dry Creek Second Wind way is a street 949 01:13:18,239 --> 01:13:26,880 off of that looking at the location map on the screen so this is second one way 950 01:13:24,540 --> 01:13:33,960 it's kind of the entrance to this existing facility here 951 01:13:30,380 --> 01:13:38,699 and what we're talking about tonight is an expansion of the Triana Winery 952 01:13:36,239 --> 01:13:44,699 project which would then go out into this area here so that's kind of the 953 01:13:41,820 --> 01:13:47,239 project Site Area that we're looking at this evening 954 01:13:47,880 --> 01:13:57,120 so this is a tracked map that uh kind of re-oriented and subdivided a few 955 01:13:54,780 --> 01:14:02,580 additional Parcels out that the city was involved with at the airport these are 956 01:13:58,920 --> 01:14:07,320 airport lease sites so Triana Winery leases has a long-term lease with the uh 957 01:14:05,699 --> 01:14:12,719 with the airport with the city through the airport of these properties so 958 01:14:09,840 --> 01:14:18,440 they've expanded their lease to get additional properties to accommodate 959 01:14:15,300 --> 01:14:18,440 this expansion area 960 01:14:20,159 --> 01:14:28,320 in this photo here you can kind of see where this says Cirrus Lane this was the 961 01:14:25,560 --> 01:14:36,060 previous alignment of a paper Street not built with the the new tracked map that 962 01:14:33,000 --> 01:14:42,719 portion was abandoned and then Wing or right way is what is the new Street with 963 01:14:39,480 --> 01:14:48,420 the cul-de-sac that will be constructed by the city uh I believe that that is 964 01:14:46,560 --> 01:14:52,980 happening fairly soon with the construction of that road would happen 965 01:14:49,920 --> 01:14:56,840 so this property would be along Dry Creek Road in an a long right way 966 01:14:57,659 --> 01:15:05,640 and then just the site plan here's the existing facility there's some existing 967 01:15:03,480 --> 01:15:11,060 tanks here but then this new facility happens on these gray and dark area 968 01:15:08,460 --> 01:15:11,060 buildings 969 01:15:12,239 --> 01:15:18,739 this is more of a specific site plan for the expansion area 970 01:15:20,820 --> 01:15:30,300 so this building here on the right is the case goods building and some 971 01:15:27,600 --> 01:15:37,800 Administration area the building in the center here is where the bottling or I'm 972 01:15:33,480 --> 01:15:43,020 sorry the uh Barrel storage is law as well as additional Bearer storage and I 973 01:15:40,320 --> 01:15:45,860 believe there's a bottling component in this area here 974 01:15:48,300 --> 01:15:56,580 this is a landscape plan for the project the photo above kind of shows the 975 01:15:54,659 --> 01:16:02,179 existing landscaping that's been done along Dry Creek Road the intent is that 976 01:16:00,060 --> 01:16:08,040 that Landscaping palette would continue 977 01:16:04,140 --> 01:16:13,920 across Dry Creek Road and then turn up in the long right way here and then 978 01:16:11,460 --> 01:16:21,719 provide the landscape set back along with the parking lot trees I believe the 979 01:16:17,159 --> 01:16:26,340 at the at the DRC meeting Mr hope indicated that they were doing some work 980 01:16:23,640 --> 01:16:31,260 to that existing landscape area and had some other ideas for what was happening 981 01:16:28,260 --> 01:16:35,880 so maybe we can have him explain and provide us of what they've been working 982 01:16:33,120 --> 01:16:40,159 on and what uh if there's any changes proposed from this plan here 983 01:16:41,340 --> 01:16:45,739 there's another picture of that area 984 01:16:46,380 --> 01:16:53,340 conditions of approval has been added to make sure that the landscape comes all 985 01:16:51,179 --> 01:16:57,179 the way down and is planted all the way down to the edge of the curb along here 986 01:16:54,960 --> 01:17:00,600 so that's a condition of approval that was added 987 01:16:58,400 --> 01:17:07,500 the other condition related to Landscaping that was added was uh 988 01:17:03,840 --> 01:17:12,480 to a landscape across the back the zoning ordinance requires Frontage 989 01:17:10,020 --> 01:17:18,420 Landscaping along streets but also a minimum of three feet landscape along 990 01:17:14,460 --> 01:17:20,600 the interior edges so that's proposed as well 991 01:17:22,920 --> 01:17:30,300 this we've been working the planning Department's been working with uh 992 01:17:27,420 --> 01:17:34,920 with the Hope Family quite some time on this project uh early on there were some 993 01:17:33,420 --> 01:17:42,060 discussions of some much taller buildings this this area of the city is 994 01:17:38,940 --> 01:17:46,679 in the airport Zone we don't have specific development standards in the 995 01:17:44,880 --> 01:17:51,120 airport Zone that say here's the max height or here's the 996 01:17:48,620 --> 01:17:58,320 specific requirement for setbacks or those kind of things we typically 997 01:17:54,440 --> 01:18:05,540 use whether it's the C3 zone or the planned industrial Zone as a you know 998 01:18:02,159 --> 01:18:09,980 kind of a feeler gauge for the the standards that we would do in the 999 01:18:07,320 --> 01:18:09,980 airport Zone 1000 01:18:10,080 --> 01:18:17,100 what we worked with the applicants on was coming up with a 58-foot ridge 1001 01:18:14,340 --> 01:18:24,120 height so the maximum height is 58 feet as it comes down to the edges it's it's 1002 01:18:19,920 --> 01:18:30,900 shorter than that uh 50 feet is the max height in the planned industrial Zone 1003 01:18:27,300 --> 01:18:37,800 the PM Zone which is uh the wisteria and Germain those types of streets or in the 1004 01:18:33,960 --> 01:18:43,679 C3 zone is 50 foot is the max 58 feet here is being proposed it seems 1005 01:18:39,540 --> 01:18:49,400 reasonable for this area and it as I mentioned the airport Zone would allow 1006 01:18:45,239 --> 01:18:49,400 up to 58 feet here 1007 01:18:49,440 --> 01:18:59,159 here's some exterior elevations again staff work to get with the applicants 1008 01:18:55,020 --> 01:19:03,540 with the pulse and Associates to uh to come up with these elevations I think 1009 01:19:01,860 --> 01:19:10,620 some of the colors some of the windows are even added since it was at DRC 1010 01:19:07,400 --> 01:19:16,440 the last time but in but in general coming up with these improvements to 1011 01:19:12,900 --> 01:19:22,440 these facade areas helped out and staff is able to to recommend and support this 1012 01:19:20,640 --> 01:19:25,460 elevations on these proposed buildings 1013 01:19:28,080 --> 01:19:35,520 colors and materials The Core 10 the metal 1014 01:19:32,179 --> 01:19:41,760 is what's being proposed the paint colors are shown here 1015 01:19:38,000 --> 01:19:47,040 I think the applicant along with the the architect can kind of get into that a 1016 01:19:43,440 --> 01:19:53,159 little more on on their discussion uh here's some prospective views just 1017 01:19:49,860 --> 01:19:58,760 kind of showing that that interior that interior travel way there the the 1018 01:19:55,380 --> 01:19:58,760 circulation around the site 1019 01:19:59,520 --> 01:20:06,960 and these are looking if you're standing in Dry Creek Road kind of looking toward 1020 01:20:04,920 --> 01:20:10,800 the East for the project for this picture on the left and then if you were 1021 01:20:09,300 --> 01:20:16,020 standing on the east side of the project looking back towards the West this is 1022 01:20:13,080 --> 01:20:18,620 that uh West corner there or the east corner there 1023 01:20:21,480 --> 01:20:26,840 you require a mitigated negative declaration that was circulated for this 1024 01:20:25,920 --> 01:20:33,239 project we did receive three letters from 1025 01:20:30,540 --> 01:20:39,900 agencies as part of that circulation of the the mitigated negative declaration 1026 01:20:36,320 --> 01:20:44,600 one letter was from the slow County Air Pollution Control District this project 1027 01:20:42,120 --> 01:20:50,100 had an air quality study and there were some questions related to 1028 01:20:48,060 --> 01:20:54,060 that study and some of the information within there 1029 01:20:52,080 --> 01:21:00,420 uh when I got the Air Pollution Control District letter I provided it to the 1030 01:20:57,600 --> 01:21:05,640 Triana air quality consultant who was able to answer the questions by the Air 1031 01:21:03,840 --> 01:21:10,860 Pollution Control District we sent that letter back to them but there was no 1032 01:21:08,640 --> 01:21:16,380 proposal for any additional or changes to any of the mitigation measures 1033 01:21:14,100 --> 01:21:19,980 we received a the second letter we received was from the Department of 1034 01:21:17,580 --> 01:21:25,199 Conservation this was more of just a report that they checked the site for 1035 01:21:21,960 --> 01:21:29,400 any abandoned oil or gas Wells that's what they look for and the letter 1036 01:21:27,179 --> 01:21:34,820 indicated that there was none found in the project area but that's the letter 1037 01:21:31,920 --> 01:21:39,420 we received there was no additional information required as a 1038 01:21:37,739 --> 01:21:43,380 result of that letter and then 1039 01:21:40,980 --> 01:21:48,300 about 10 minutes prior to the meeting we received the letter from Caltrans and if 1040 01:21:46,500 --> 01:21:53,760 you recall we did quite a bit of work on the uh Stravinsky and DOW project and 1041 01:21:52,080 --> 01:21:59,520 the traffic study that was done there and along with uh you know this project 1042 01:21:57,179 --> 01:22:05,880 was being reviewed at the same time so all those uh impacts on Airport Road on 1043 01:22:04,140 --> 01:22:11,840 Dry Creek all of those were looked at with both that Stravinsky Dow project 1044 01:22:08,340 --> 01:22:16,560 but also this project so we were able to narrow down and work with Caltrans on 1045 01:22:14,580 --> 01:22:22,620 the mitigation measures for the Stravinsky Dow project which we were 1046 01:22:18,480 --> 01:22:30,480 then able to apply to this project so that Airport Road and the the 1047 01:22:26,840 --> 01:22:35,940 right turns only and cutting off the left turns going eastbound on Highway 46 1048 01:22:33,300 --> 01:22:40,980 from airport road is uh the same mitigation that was required for this 1049 01:22:38,760 --> 01:22:45,739 project and the Caltrans letter just verified that they had no other 1050 01:22:43,260 --> 01:22:50,100 proposals for changes or any different concerns with this project 1051 01:22:48,060 --> 01:22:56,760 foreign so before you this evening is is the 1052 01:22:53,580 --> 01:23:02,520 options the first option is to prove the mitigated negative declaration to 1053 01:22:59,640 --> 01:23:06,600 approve the development plan allowing the expansion of the project or option 1054 01:23:04,620 --> 01:23:11,820 two could be recommend approval of the project with some modifications that the 1055 01:23:09,780 --> 01:23:16,440 Planning Commission may come up with or three is to refer the project back to 1056 01:23:13,679 --> 01:23:24,000 staff for additional analysis or four is to not deny the project giving specific 1057 01:23:19,380 --> 01:23:28,080 findings on reasons for denial and with that I'd be happy to answer any 1058 01:23:25,800 --> 01:23:32,100 questions okay uh let's start with commissioner 1059 01:23:30,540 --> 01:23:34,920 Marlow do you have any questions for staff or the well you know what let's do 1060 01:23:33,840 --> 01:23:37,860 this um does the applicant want to come up 1061 01:23:36,360 --> 01:23:42,239 and talk first maybe that's probably the better thing to do apologize 1062 01:23:39,360 --> 01:23:46,260 commissioner come on up and and give us your 1063 01:23:43,500 --> 01:23:51,480 commentary uh can you announce who you are yes thank you so I'm Austin hope 1064 01:23:48,600 --> 01:23:56,400 president of Hope Family wines and as we're speaking about Triana 1065 01:23:53,480 --> 01:24:01,320 first off I want to thank the city staff they've been very helpful in helping us 1066 01:23:59,699 --> 01:24:07,380 navigate the waters is obviously a large large project large Edition and uh 1067 01:24:04,320 --> 01:24:10,020 they have been supporters of us and and have 1068 01:24:08,400 --> 01:24:13,199 helped us navigate the water which is very very appreciative and I appreciate 1069 01:24:11,699 --> 01:24:16,620 the the commission as well because there's been obviously this has been 1070 01:24:15,300 --> 01:24:20,520 back and forth a few different times and everybody's kind of got a piece of it 1071 01:24:18,600 --> 01:24:23,880 and and helped uh mysterious in the right direction and uh 1072 01:24:22,380 --> 01:24:28,020 what's possible and what's not possible so anyways 1073 01:24:26,100 --> 01:24:34,500 um first off is pretty wild this is uh my 1074 01:24:31,320 --> 01:24:38,300 family's been here since 1978 and you know we we never dreamed that we'd have 1075 01:24:37,020 --> 01:24:43,920 success and have so many families working with us 1076 01:24:41,699 --> 01:24:47,460 and and growing and and see this community Thrive like it is it's it's 1077 01:24:45,719 --> 01:24:51,480 just uh it's a blessing for everybody quite honestly and 1078 01:24:49,080 --> 01:24:55,380 um we're thrilled about it so the main the main reason for this is uh you know 1079 01:24:53,880 --> 01:25:00,060 we've been a we've been attendant of the cities for 27 years out there and it 1080 01:24:57,659 --> 01:25:04,140 added on as we've gone along and this one really is to 1081 01:25:01,440 --> 01:25:06,480 bring back everything that we've we've accomplished and that have done over the 1082 01:25:05,580 --> 01:25:10,860 years back to Paso 1083 01:25:08,520 --> 01:25:13,980 um we've grown and you know we haven't had money to do things we've had to 1084 01:25:12,300 --> 01:25:18,719 Outsource and over the years and and this one really is just to bring 1085 01:25:15,420 --> 01:25:24,000 everything back home so currently uh we ship a lot of wine out of the area that 1086 01:25:21,719 --> 01:25:30,659 goes to another facility up north and it's bottled up there shipped from 1087 01:25:26,460 --> 01:25:33,600 there so this is really we're we're very serious about our quality of how we do 1088 01:25:32,219 --> 01:25:37,199 things and it's bothered us for the years of being able to ship things off 1089 01:25:35,159 --> 01:25:42,840 and we're flying to a point where we're ready to take the region and and 1090 01:25:39,540 --> 01:25:45,900 and and and go for this this size to be able to bring everything home so that's 1091 01:25:44,280 --> 01:25:50,640 that's the big thing is if for us it's bringing everything home 1092 01:25:47,520 --> 01:25:56,100 um with that said that it's a positive not only for us for our community but 1093 01:25:52,739 --> 01:25:59,460 for for infrastructure we you know send a tremendous amount of 1094 01:25:58,020 --> 01:26:04,380 trucks that's wear and tear on the highways and and traffic and all that so 1095 01:26:02,100 --> 01:26:08,520 this keeps it all in one spot so we can bottle all our wine there we can 1096 01:26:06,600 --> 01:26:12,600 distribute from there rather than having to go up and back up and back and and 1097 01:26:10,260 --> 01:26:16,500 multiple times so it's really it's a I think it's a win-win for everybody 1098 01:26:13,679 --> 01:26:21,120 honestly and I think it's going to help help with traffic too within that 1099 01:26:18,420 --> 01:26:24,600 particular area and you know being pushed into having to put what they call 1100 01:26:23,159 --> 01:26:29,699 a pork chop which I never knew what type of pork chop was until until I learned 1101 01:26:27,360 --> 01:26:34,380 it said can't turn left so that was uh that was a new word for me but uh I'm 1102 01:26:32,460 --> 01:26:38,100 actually very pleased with that because it is very dangerous uh that that 1103 01:26:36,480 --> 01:26:41,040 left-hand touring Lane so I think it's a positive thing that Caltrans and the 1104 01:26:39,780 --> 01:26:46,139 city have worked on to bring that back to us and we're more than happy to 1105 01:26:43,620 --> 01:26:50,219 to get that going in the works um you know outside of that I think it's 1106 01:26:47,940 --> 01:26:54,120 uh we'll leave it to you guys but you know I think it's a we're in a wonderful 1107 01:26:51,780 --> 01:26:58,860 place Castle's grown and it's uh we're a fairly good sized company that 1108 01:26:56,400 --> 01:27:03,239 uh employs people all over the country in the world we're in uh 30 30 countries 1109 01:27:01,620 --> 01:27:06,360 now and been spreading the Passover message and so it's just it's exciting 1110 01:27:04,920 --> 01:27:09,480 to be part of the community we love this area and you know we've been here our 1111 01:27:07,739 --> 01:27:13,199 whole lives and want to continue to grow it and 1112 01:27:10,739 --> 01:27:18,300 in the right way and and call this home so welcome any questions and I've got JC 1113 01:27:16,560 --> 01:27:21,360 which our director of wine making with us if you've got questions in regards to 1114 01:27:20,040 --> 01:27:24,480 any of those types of things then we've got Andres from 1115 01:27:22,800 --> 01:27:29,400 Polson associate which is doing our architect and so with that we'll put it 1116 01:27:27,480 --> 01:27:32,520 back to you guys the whole landscape I'm sorry I will touch on landscape but some 1117 01:27:31,199 --> 01:27:36,719 people know me some people don't but I'm a landscape freak so we've uh since that 1118 01:27:35,159 --> 01:27:41,580 last photo you've seen I've already put in uh like 145 different trees more 1119 01:27:39,780 --> 01:27:45,420 trees that you'll you'll see once we start spring gets going and so you can 1120 01:27:44,520 --> 01:27:49,860 rest assured you don't have to worry about landscape I'm I'm goofy about 1121 01:27:47,040 --> 01:27:54,719 landscape I I overdo landscape so that's uh and we are the uh where Darren 1122 01:27:53,040 --> 01:27:58,260 pointed out that we'd already talked about bringing it down to the road 1123 01:27:55,800 --> 01:28:01,560 that's in the words uh we're ordering all the plants we finally picked those 1124 01:27:59,520 --> 01:28:07,620 out so those will come right down probably like three foot off the off the 1125 01:28:03,480 --> 01:28:10,679 road the minimum is there and we just got another shipment of trees the other 1126 01:28:08,880 --> 01:28:15,420 day so it's gonna be it'll be pretty it'll be overdone uh way past the 1127 01:28:12,840 --> 01:28:20,540 expectations of of what you might ask and uh 1128 01:28:17,580 --> 01:28:20,540 yeah they miss anything 1129 01:28:24,900 --> 01:28:31,920 oh in the existing build as you did see uh you saw our new renderings with a 1130 01:28:30,300 --> 01:28:35,940 the different uh uh architectural design so we're going 1131 01:28:34,500 --> 01:28:39,480 to bring that all the way around so if you go back a couple slides but do they 1132 01:28:38,340 --> 01:28:41,840 have a picture of the existing on there I can't remember 1133 01:28:42,199 --> 01:28:47,820 I don't think it'd be there but if you've been out there before they're 1134 01:28:46,020 --> 01:28:52,560 just they're they're still buildings there's there's nothing other than the 1135 01:28:49,260 --> 01:28:56,280 landscape around it so we're gonna take these type of same things and put it to 1136 01:28:55,020 --> 01:28:59,219 the existing building so it ties together and it kind of beautifies the 1137 01:28:57,719 --> 01:29:02,460 whole neighborhood if you will 1138 01:29:00,960 --> 01:29:06,780 so maybe that's just kind of the things we do I mean right it's a visually 1139 01:29:05,159 --> 01:29:10,500 architecturally I love those types of things so we want 1140 01:29:08,940 --> 01:29:14,159 we're proud of this place and we're proud of where we live and proud of 1141 01:29:11,820 --> 01:29:19,920 where we we make wine so we want to we want it to look well all right thank you 1142 01:29:17,400 --> 01:29:26,100 um okay let's go to uh questions from Commissioners Dr Mr Marla yeah I just 1143 01:29:23,400 --> 01:29:30,000 just a couple uh I'm being an aviator there Airport Community is really 1144 01:29:27,840 --> 01:29:34,500 important to me and and I like to see that fact that you're going to bring up 1145 01:29:32,400 --> 01:29:41,159 you know something like this I guess my question is with the museum down the 1146 01:29:37,139 --> 01:29:46,440 road and the estimated you know 380 new vehicle trips like is there a consider I 1147 01:29:43,860 --> 01:29:49,800 mean obviously caltransit a study but do we feel that there's going to be an 1148 01:29:47,520 --> 01:29:53,760 impact to the museum down there or I mean it might be an impact in a good way 1149 01:29:51,179 --> 01:29:58,500 I just uh without getting too far into it has that been looked at or for the 1150 01:29:56,100 --> 01:30:02,460 traffic for the museum down there I'll let JCS for that so yeah we have 1151 01:30:01,139 --> 01:30:08,940 been talking with them on the traffic study and a lot of it uh that was kind 1152 01:30:06,060 --> 01:30:13,320 of posted on what they felt was the the traffic so a lot of this is as Austin 1153 01:30:11,520 --> 01:30:17,400 alluded to before we talked about the vehicles in and out so right now we're 1154 01:30:15,540 --> 01:30:22,020 larger than what we are there so we have to send wine out to store bring it back 1155 01:30:20,159 --> 01:30:25,620 for process send it out again for bottling so what we'll do now is we'll 1156 01:30:23,760 --> 01:30:29,520 bring in the grapes everything stays there for a year and a half two years 1157 01:30:26,820 --> 01:30:34,320 prior to it being finished and shipped out so we're eliminating basically three 1158 01:30:31,739 --> 01:30:38,820 of the truck trips to to do the one trip at the end okay 1159 01:30:35,940 --> 01:30:43,560 um and so in a lot of our staffing so this helps us uh put in a lot more as 1160 01:30:42,300 --> 01:30:48,300 you see the height of the buildings there's a reason for that we're bringing 1161 01:30:45,719 --> 01:30:53,940 in safety to put in a racking system so it's earthquake safety it's safety for 1162 01:30:50,280 --> 01:30:58,199 our personnel and it also brings in uh that we don't have to have so many 1163 01:30:55,800 --> 01:31:02,520 people there to move all the barrels so we're bringing in automation to help 1164 01:30:59,760 --> 01:31:06,780 stack them uh it works with the case goods as well so being a case system 1165 01:31:04,679 --> 01:31:10,860 that will stop there to bring more automation so right now we have roughly 1166 01:31:08,520 --> 01:31:13,920 41 employees there uh when we're finished it'll be around 39. 1167 01:31:13,380 --> 01:31:19,320 um so a lot of that it's going to be using 1168 01:31:16,380 --> 01:31:26,820 this different equipment so in terms of uh the area we should have less vehicle 1169 01:31:23,699 --> 01:31:30,179 traffic uh than a lot of those things um as the size grows it's going to be 1170 01:31:29,280 --> 01:31:34,980 you know you're going to have more because of more case goods but it's 1171 01:31:32,760 --> 01:31:41,219 going to be a minimal amount uh in the difference so they don't foresee any 1172 01:31:36,840 --> 01:31:46,280 impact in terms of them we do not do uh tastings or wine cells out of the site 1173 01:31:47,360 --> 01:31:52,739 gonna be a minimum so if a distributor that comes to town 1174 01:31:51,600 --> 01:31:57,179 um but it wouldn't be anything that you'd see it'd be maybe one or two a 1175 01:31:54,960 --> 01:32:02,280 month at the most but it's not uh Public tours so it's only a Private Industry 1176 01:32:00,540 --> 01:32:06,659 yeah the only other question I have is when you guys plan on breaking ground 1177 01:32:04,440 --> 01:32:11,820 and what's the anticipated duration of the project 1178 01:32:07,880 --> 01:32:18,659 uh so the phase one portion uh would be breaking ground by hopefully 1179 01:32:15,739 --> 01:32:24,840 by mid-april um and anticipation would be uh 300 to 1180 01:32:22,080 --> 01:32:28,739 400 Days okay and it's so it's phased and what phase two would be the 1181 01:32:26,340 --> 01:32:35,460 renovations of the existing buildings or no that would be starting now okay phase 1182 01:32:31,800 --> 01:32:41,659 one would be the case room and the uh covering on the existing uh take pad 1183 01:32:37,739 --> 01:32:41,659 okay great thanks 1184 01:32:43,139 --> 01:32:48,480 commissioner Conley questions for staff or the applicant 1185 01:32:46,679 --> 01:32:53,940 yeah thank you um with regards to the mitigation 1186 01:32:50,219 --> 01:33:00,600 measures uh there is a mention about uh they're set forth in the uh 1187 01:32:57,239 --> 01:33:06,420 mitigation monitoring and Reporting plan is that included in this package 1188 01:33:03,139 --> 01:33:08,760 mitigation measures for I'm sorry I didn't hardly hear what your question 1189 01:33:07,620 --> 01:33:15,420 was well uh the draft resolution speaks of 1190 01:33:12,840 --> 01:33:21,480 mitigation measures and uh just wanted to know it says there 1191 01:33:19,520 --> 01:33:25,920 imposed on the project through the adoption of a mitigation monitoring and 1192 01:33:24,300 --> 01:33:30,360 Reporting plan so yes that's part of that resolution a 1193 01:33:28,380 --> 01:33:36,179 for the Medicaid negative declaration the mitigation and monitoring plan is 1194 01:33:33,000 --> 01:33:39,380 attached to that resolution and uh 1195 01:33:39,900 --> 01:33:48,300 so that's in here with regard to traffic impacts and then secondarily all of 1196 01:33:45,780 --> 01:33:53,040 those mitigation measures are also then put in the conditions of approval so 1197 01:33:51,060 --> 01:33:59,219 they're twice they're in both resolutions so I assume that uh that's 1198 01:33:56,460 --> 01:34:06,239 part of the overall project to bring Airport Road over Crossing in and all of 1199 01:34:02,940 --> 01:34:11,540 all of the master plans for circulation area element of this area or correct so 1200 01:34:09,480 --> 01:34:17,480 the the traffic consultant uh 1201 01:34:14,340 --> 01:34:21,120 Central Coast traffic Consultants Joe Fernandez and his 1202 01:34:20,040 --> 01:34:27,540 company are is the only traffic consultant the 1203 01:34:23,580 --> 01:34:35,460 city has but they've looked a lot in this airport area in this Highway 46 1204 01:34:30,659 --> 01:34:39,719 East Corridor on ways regionally and for this part of the city to look at 1205 01:34:37,800 --> 01:34:44,580 different ways to to help with the traffic because we know that Highway 46 1206 01:34:41,460 --> 01:34:48,840 and trying to get uh intersections and things there are not the best so I don't 1207 01:34:46,260 --> 01:34:52,260 know if there's enough impact here for them to contribute to that towards that 1208 01:34:50,520 --> 01:34:57,780 that was kind of my question with the increase in size and maybe increase in 1209 01:34:55,260 --> 01:35:03,360 vehicle traffic so they're they're going to be responsible for the the right turn 1210 01:35:00,239 --> 01:35:07,860 along with uh some of the other projects but they'll also pay traffic impact fees 1211 01:35:05,580 --> 01:35:13,400 that will ultimately that will ultimately work towards future bigger 1212 01:35:10,920 --> 01:35:13,400 projects 1213 01:35:13,920 --> 01:35:21,739 pretty much answers my question there but uh just out of curiosity how many 1214 01:35:18,480 --> 01:35:21,739 jobs will this uh 1215 01:35:23,880 --> 01:35:30,960 um we're growing all the time I mean it's uh we hired two people yesterday 1216 01:35:28,320 --> 01:35:34,679 it's it's it continues I mean I can't give you a real number but we're not 1217 01:35:32,880 --> 01:35:39,000 we're not uh we're not shy on hiring people so this is this is a good thing 1218 01:35:36,179 --> 01:35:43,739 if it brings uh employment within this yes yes no we're not we're not uh 1219 01:35:41,520 --> 01:35:49,620 looking to be less less employees we're looking to grow the community is there 1220 01:35:46,620 --> 01:35:54,000 uh is the access hat or is there access at Jardine Road for this project I know 1221 01:35:52,139 --> 01:36:01,560 it's kind of equal distance between airport Jardine do you see any 1222 01:35:57,480 --> 01:36:08,639 operations using Jardine entrance uh Jardine entrance no they are potentially 1223 01:36:04,440 --> 01:36:12,060 going leaving to get 46. yeah but uh I don't see him using Jardine no okay I 1224 01:36:10,739 --> 01:36:15,659 mean the only thing that would be on Jardine would be if there's a Vineyard 1225 01:36:13,440 --> 01:36:21,600 out there that brings in grapes but well no I don't see any additional 1226 01:36:18,540 --> 01:36:26,239 and uh now I've noticed there's a uh drainage 1227 01:36:24,000 --> 01:36:26,239 foreign 1228 01:36:28,460 --> 01:36:36,780 expanding of some retention basins as a result of the drainage proposal 1229 01:36:34,860 --> 01:36:42,060 is there going to be Landscaping within that those basins or just um we 1230 01:36:40,260 --> 01:36:47,400 certainly could put some trees around it but it's definitely it's on the interior 1231 01:36:43,860 --> 01:36:52,320 side so it's not exposed to anything it would be on the you know the airport 1232 01:36:49,280 --> 01:36:58,320 taxiways that side so it wasn't brought up but again I love Landscapes I mean 1233 01:36:54,659 --> 01:37:00,900 yeah well yeah to the extent that it still functions yeah that'd be great 1234 01:36:59,760 --> 01:37:05,880 yeah okay that's it thank you okay 1235 01:37:03,020 --> 01:37:09,719 commissioner kogler yes thank you I have a couple of 1236 01:37:07,860 --> 01:37:12,840 questions for David Athie city engineer I know he was eager to get up there a 1237 01:37:11,219 --> 01:37:19,440 minute ago um first of those being the tdmp plan is 1238 01:37:16,679 --> 01:37:23,940 that approved by staff uh the travel demand yes David athy city 1239 01:37:22,080 --> 01:37:30,780 engineer the travel the van management plan is approved by staff uh it has to 1240 01:37:28,020 --> 01:37:36,360 meet the conditions that are in the for the project which are the hours of 1241 01:37:32,520 --> 01:37:40,860 operation and using uh Airport Road you know are two of the different 1242 01:37:38,400 --> 01:37:44,400 conditions in there right and that was what kind of prompted the question that 1243 01:37:42,239 --> 01:37:52,139 it is that the edict is you use Airport Road how does that TD I used to call him 1244 01:37:47,880 --> 01:37:55,380 tmps tdmp get translated down stream to the truck drivers and everybody else so 1245 01:37:53,699 --> 01:38:00,060 that they know what the rules of the game are that's a great question I think 1246 01:37:57,360 --> 01:38:04,500 I let the applicant um answer that how they interact with their drivers and 1247 01:38:02,460 --> 01:38:06,560 contracts and stuff yeah 1248 01:38:07,199 --> 01:38:13,739 so our shipping's by appointment only and so I think that's part of the 1249 01:38:10,920 --> 01:38:18,780 question is is when we're shipping out um and the time of use 1250 01:38:16,040 --> 01:38:21,960 but all our shippings uh by appointments so that's where we talked about 1251 01:38:19,980 --> 01:38:25,380 minimizing those during those times of use 1252 01:38:23,040 --> 01:38:30,540 um also majority of all our shipment goes north so a lot of it doesn't even 1253 01:38:27,980 --> 01:38:35,699 go down the highway um it'll go directly north on Airport 1254 01:38:32,219 --> 01:38:38,239 Road and go back to 101 through the San Miguel area 1255 01:38:38,280 --> 01:38:44,940 okay thank you uh David the 1256 01:38:43,260 --> 01:38:50,159 there's a discussion in the traffic report about the extension of the 1257 01:38:48,239 --> 01:38:55,860 acceleration Lane and there are some numbers in there 625 feet I think was 1258 01:38:53,520 --> 01:39:01,980 recommended or is the existing perhaps for the Airport Road intersection with 1259 01:38:59,280 --> 01:39:06,900 46. there's commentary about expanding that between 960 to 1200 feet depending 1260 01:39:04,440 --> 01:39:10,739 on the desired speed to get the trucks to integrate in with traffic there's 1261 01:39:08,760 --> 01:39:14,460 reference in here to extension of that but it doesn't Peg that to a number how 1262 01:39:12,659 --> 01:39:20,960 long will that extension that's going to be added be when it's complete 1263 01:39:16,860 --> 01:39:20,960 so that that actually uh 1264 01:39:21,179 --> 01:39:27,900 bad idea or that potential mitigation is not 1265 01:39:26,159 --> 01:39:33,000 favored by Caltrans uh in the most recent letter with 1266 01:39:29,880 --> 01:39:39,000 Stravinsky Dao and now with Triana uh their preferred alternative is the world 1267 01:39:36,000 --> 01:39:44,820 bridge for getting folks to Golden Hill Road in the interim 1268 01:39:41,360 --> 01:39:50,040 they'd prefer that the left out so the southbound left to eastbound 46 be 1269 01:39:48,900 --> 01:39:56,159 closed and that traffic be sent to Golden Hill 1270 01:39:53,340 --> 01:40:00,980 Road passenger type Vehicles so pickup trucks and cars would do a u-turn at 1271 01:39:59,219 --> 01:40:06,060 Golden Hill which is currently allowed uh larger Vehicles would go up through 1272 01:40:03,960 --> 01:40:11,219 the city uh to the Golden Hill round about and either down Union Road or back 1273 01:40:08,820 --> 01:40:15,840 to Golden Hill that's the interim condition until on the where aware of 1274 01:40:13,920 --> 01:40:20,040 bridge is built um 1275 01:40:16,920 --> 01:40:25,980 you know we the the uh the conditions are set up so that that traffic itself 1276 01:40:22,620 --> 01:40:32,040 won't be on either City surface streets or Highway 46 at peak hours 1277 01:40:29,580 --> 01:40:37,440 uh so that traffic won't be interfering with local city traffic uh and which is 1278 01:40:35,159 --> 01:40:41,760 also part of the tdmp why it's important that these things all be tied together 1279 01:40:38,760 --> 01:40:46,980 so the the left the acceleration Lane has been abandoned that that solution is 1280 01:40:44,100 --> 01:40:52,080 not favored by Caltrans and so what what we've conditioned the project to do is 1281 01:40:49,500 --> 01:40:56,280 comply with what the recommendations are from Caltrans okay which is part of 1282 01:40:54,540 --> 01:41:02,639 which is number two in the three different options which is uh you know 1283 01:40:59,400 --> 01:41:08,159 do a u-turn on 46. and refresh my memory when will we attend the ribbon cutting 1284 01:41:04,440 --> 01:41:12,000 for the world bridge I I hope as soon as possible uh it's currently under design 1285 01:41:10,500 --> 01:41:17,159 and has gone through environmental review so that project is moving forward 1286 01:41:14,100 --> 01:41:21,179 we anticipate with the landing and the other projects and the and the uh we 1287 01:41:19,620 --> 01:41:24,920 talked about the um 1288 01:41:22,020 --> 01:41:24,920 uh 1289 01:41:25,440 --> 01:41:32,460 the uh the traffic impact fee sorry I was having a senior moment there 1290 01:41:30,060 --> 01:41:36,780 um the traffic impact fees paid we're currently putting the funds together to 1291 01:41:34,139 --> 01:41:43,020 build that bridge so a few years maybe yes anticipate a few years okay 25 26 I 1292 01:41:40,739 --> 01:41:47,639 think is the Target right now okay all right and then finally there's again the 1293 01:41:45,900 --> 01:41:51,360 traffic report and this may have been another element that's that's not going 1294 01:41:49,440 --> 01:41:55,980 to be ultimately recommendation if there's discussion of the bike usage on 1295 01:41:54,659 --> 01:42:00,840 Dry Creek Road and the potential to I don't have the 1296 01:41:58,920 --> 01:42:04,560 languages exactly some additional width or something is there any change to 1297 01:42:02,460 --> 01:42:09,900 accommodate bikes either as a part of this or in the future on Dry Creek 1298 01:42:06,540 --> 01:42:15,360 uh now with this project uh possibly in the future right now Dry Creek Road is 1299 01:42:12,000 --> 01:42:19,800 seen as a class 3 Bikeway which is on you know basically signed but not 1300 01:42:17,280 --> 01:42:23,820 striped uh and there is no plans to increase the width of Dry Creek if it's 1301 01:42:22,139 --> 01:42:26,940 done yeah I think I was reacting to a 1302 01:42:25,560 --> 01:42:30,780 reference that the city's arterial standards are actually for by class two 1303 01:42:28,860 --> 01:42:35,040 even though other plants they class through 1304 01:42:32,100 --> 01:42:39,719 the arterial standards do have that uh the city made the city council made a 1305 01:42:37,500 --> 01:42:43,679 decision to build Dry Creek in its current configuration okay thank you 1306 01:42:42,119 --> 01:42:46,880 that's all the questions I have thank you Mr chair 1307 01:42:47,880 --> 01:42:53,940 all right commissioner co-rubias don't go too far David 1308 01:42:51,560 --> 01:42:58,380 I do have a question for awesome but I'll ask you first David so 1309 01:42:56,639 --> 01:43:04,020 commissioner kogler nailed it when he asked about the where were Bridge 1310 01:43:00,560 --> 01:43:09,239 2526-ish we have other projects out on Airport Road that are future development 1311 01:43:06,420 --> 01:43:15,060 some may even get approved prior to that I'm thinking summer months 1312 01:43:12,420 --> 01:43:21,480 Ravine water park packed you got now this Winery you've got 1313 01:43:17,820 --> 01:43:25,800 Stravinsky Dao I mean the plan that Caltrans come up with is obviously make 1314 01:43:24,179 --> 01:43:30,840 that right we talked about this during Stravinsky 1315 01:43:28,380 --> 01:43:36,600 how are we going to monitor and keep those trucks from making u-turns 1316 01:43:33,480 --> 01:43:40,980 and and not trying to make a left when they're geared to make a right I mean 1317 01:43:38,400 --> 01:43:44,820 it's impossible to monitor that yes I mean what's going to prevent these guys 1318 01:43:42,900 --> 01:43:50,880 I mean is that whole intersection going to be redone re revised other than just 1319 01:43:48,239 --> 01:43:56,760 a speed up Lane I just sound clear you're referring to 1320 01:43:52,980 --> 01:44:01,679 airport yeah yes uh so as someone mentioned earlier uh 1321 01:43:59,340 --> 01:44:06,780 the construction of it's a raised median Island but it's called the pork chop 1322 01:44:03,659 --> 01:44:10,199 it's kind of the art term of art uh so that will be in place there's actually 1323 01:44:08,219 --> 01:44:17,580 one similar to it you can look at right now at uh sensorio so they have they 1324 01:44:14,520 --> 01:44:22,380 Caltrans did not allow them to have a left turn out at sensorio heading 1325 01:44:19,739 --> 01:44:27,659 towards Fresno so that median is in place right now it's raised it's about 1326 01:44:24,000 --> 01:44:33,000 six inch curb it forces traffic to go right you could I mean you could go 1327 01:44:31,260 --> 01:44:37,199 around that pork chop and you could get a ticket for that 1328 01:44:35,460 --> 01:44:41,960 because the right terms are prohibited at that or excuse me if the left turns 1329 01:44:39,480 --> 01:44:46,639 are prohibited uh at that intersection so the physical Improvement itself 1330 01:44:44,760 --> 01:44:52,260 raised median Island channelizes folks to turn right could 1331 01:44:49,619 --> 01:44:58,619 they go around that and turn left uh yes but typically we don't have a problem 1332 01:44:54,239 --> 01:45:02,219 with compliance in that case the odds the odd case you know could turn left 1333 01:45:01,199 --> 01:45:07,020 there but it is more difficult than than just 1334 01:45:05,400 --> 01:45:10,800 you know it's not a straight it won't be a straight shot anymore and still have 1335 01:45:08,639 --> 01:45:14,540 that like way wide open Lane yeah and I get this 1336 01:45:16,320 --> 01:45:22,080 my concern is we're building that roundabout for a 1337 01:45:20,219 --> 01:45:26,820 purpose of helping helping flow of traffic and when we start diverting 1338 01:45:24,840 --> 01:45:31,820 everybody that way I mean I it's almost counterproductive 1339 01:45:29,100 --> 01:45:36,840 is what's going to occur at least until 25 26 if we're lucky right right so 1340 01:45:35,699 --> 01:45:41,040 that's kind of a little bit of the concern is what are we doing there and 1341 01:45:38,940 --> 01:45:45,659 then you add in Barney Schwartz Park and the vehicles coming from that direction 1342 01:45:43,920 --> 01:45:51,300 um it's just to me it's concerning that's it I I hear what you're saying I 1343 01:45:48,239 --> 01:45:55,500 I think that um so there are times of day like for all 1344 01:45:53,340 --> 01:45:59,580 these projects Stravinsky Dao and now Triana they have time of day 1345 01:45:57,000 --> 01:46:03,840 restrictions on the busy like Monday through Friday Monday through Thursday 1346 01:46:00,960 --> 01:46:07,560 and Friday and in the peak hour on Sunday they have time of day 1347 01:46:05,699 --> 01:46:12,780 restrictions for travel those will coincide with the busy hours on City 1348 01:46:09,719 --> 01:46:19,860 surface streets that's only for the larger Vehicles like trucks like 1349 01:46:15,260 --> 01:46:25,619 full-size cargo type trucks or semis those Vehicles will be the ones using 1350 01:46:22,980 --> 01:46:30,840 the roundabout at the times that don't coincide 1351 01:46:28,440 --> 01:46:34,739 or could you know rarely you know you have a you have a tournament at Barney 1352 01:46:33,060 --> 01:46:39,540 Schwartz and all the soccer folks are leaving you know at one time those kind 1353 01:46:38,040 --> 01:46:44,219 of clogs are going to happen no matter what we do uh you know whether triana's 1354 01:46:42,600 --> 01:46:47,880 trucks are there or Stravinsky Dallas trucks are there you're gonna just have 1355 01:46:46,020 --> 01:46:51,239 you're gonna have a short-term impact at that intersection 1356 01:46:49,679 --> 01:46:55,380 um so that's why we set it up time of day restrictions to one not interfere 1357 01:46:53,159 --> 01:47:01,800 with the operations Caltrans facility and in the short term not interfere with 1358 01:46:57,900 --> 01:47:06,920 the cities roundabout operations uh most of the pickup trucks most of the Trap 1359 01:47:03,719 --> 01:47:15,000 the traffic will be passenger vehicles uh pickup trucks and cars those can 1360 01:47:11,100 --> 01:47:21,420 still do a u-turn at Golden Hill Road they don't need to go into the into the 1361 01:47:17,760 --> 01:47:27,300 city to do a lot to do the U-turn so we're only talking about the larger 1362 01:47:24,199 --> 01:47:31,560 Vehicles okay I appreciate it yeah thank you David 1363 01:47:28,980 --> 01:47:34,380 Mr hope I have a question sir um 1364 01:47:32,219 --> 01:47:38,340 just curious and and this maybe be a learning thing maybe even staff our 1365 01:47:36,600 --> 01:47:43,139 solar panels restricted out in that area because of the airport Darren no they're 1366 01:47:41,100 --> 01:47:47,219 not so just curious yes they're not there aren't any solar panels proposed 1367 01:47:44,699 --> 01:47:51,719 in this project yes is that right well we were putting in applications for it 1368 01:47:49,320 --> 01:47:54,960 oh you are yes okay I was looking for that and I and I must have missed it 1369 01:47:53,340 --> 01:47:59,460 then so there are certain solar panels out there being proposed uh our company 1370 01:47:57,840 --> 01:48:04,860 Bahama solar which has done a couple projects for me in the valley is uh 1371 01:48:01,679 --> 01:48:07,699 is going to submit this week because as everybody knows too they're you know 1372 01:48:06,179 --> 01:48:13,440 they're changing all the right things right in any sense that's a whole other 1373 01:48:09,719 --> 01:48:17,520 rant we could go on but uh yes so it will be solar okay perfect perfect well 1374 01:48:15,600 --> 01:48:22,860 I was on DRC so I appreciate all the changes you've made 1375 01:48:19,199 --> 01:48:26,360 um since DRC so yeah that's it okay 1376 01:48:24,300 --> 01:48:26,360 um 1377 01:48:30,860 --> 01:48:37,739 is the existing building essentially Ash Gray which is one of the colors in your 1378 01:48:35,159 --> 01:48:41,520 new palette they're very similar okay so that as as you probably know they change 1379 01:48:40,080 --> 01:48:44,340 all the time and so it's hard to pinpoint everything exactly but there's 1380 01:48:43,080 --> 01:48:47,639 not going to be major drastic differences okay your computer 1381 01:48:45,840 --> 01:48:50,880 illustrations are really helpful but it had like a muted back leaf pattern over 1382 01:48:49,619 --> 01:48:55,500 a lot of that and I couldn't tell if it was a light gray or dark gray but it all 1383 01:48:52,260 --> 01:48:58,920 Blends together yeah I feel it does okay and then my other point would be it's 1384 01:48:57,480 --> 01:49:04,380 not really a question so much as a request for staff this review is in the 1385 01:49:02,880 --> 01:49:08,520 same circumstance as one we had a couple of meetings ago in that the comment 1386 01:49:06,300 --> 01:49:12,719 period runs through today and that clock kind of keeps going 1387 01:49:10,920 --> 01:49:17,100 because any comments that are postmarked today or prior to that would still be 1388 01:49:14,699 --> 01:49:20,520 valid a day or two or three from now I would just ask staff as as we go through 1389 01:49:18,900 --> 01:49:24,239 other aspects of this just make sure the rest of the solution language reflects 1390 01:49:22,619 --> 01:49:28,380 that as we did on that previous case that the door isn't really close to 1391 01:49:26,400 --> 01:49:31,860 comments but based on the information we know as of tonight we will act on things 1392 01:49:30,179 --> 01:49:36,719 is that and one thing to understand though is 1393 01:49:34,619 --> 01:49:41,880 previous projects may have been recommendations to council so the period 1394 01:49:39,600 --> 01:49:46,800 went beyond tonight so that was a difference on Stravinsky Dao this 1395 01:49:44,699 --> 01:49:51,300 project has been noticed so that the environmental document Ends Tonight 1396 01:49:48,900 --> 01:49:55,800 so regardless of a comment is postmarked by noon today that comment is not found 1397 01:49:53,460 --> 01:49:59,340 valid we would have gotten them and they would have been 1398 01:49:56,880 --> 01:50:03,260 like the three letters we've provided those to you 1399 01:50:00,600 --> 01:50:07,020 okay all right thank you any other Commissioners follow-up 1400 01:50:05,639 --> 01:50:10,320 questions okay well 1401 01:50:08,520 --> 01:50:14,699 um hand it to my other Commissioners they asked and got answered several of 1402 01:50:12,420 --> 01:50:20,880 the questions they already had David I had one follow-up question uh for you in 1403 01:50:17,639 --> 01:50:25,080 regards to Union in 46 are you planning on putting the pork chop in that 1404 01:50:23,159 --> 01:50:29,460 situation too because I tell you what people pulling out left from 46 trying 1405 01:50:27,119 --> 01:50:33,780 to head back towards town it's just a nightmare 1406 01:50:31,320 --> 01:50:36,420 where Union comes into 46 Facing East right there right 1407 01:50:35,639 --> 01:50:40,199 um so right now there's two projects that 1408 01:50:38,340 --> 01:50:47,400 are conditioned to close that left out one is the hotel on the the South kind 1409 01:50:44,520 --> 01:50:52,260 of West corner of that kind of Y intersection and the other is the water 1410 01:50:49,920 --> 01:50:57,420 park neither project has moved forward with their with their plans uh the hotel 1411 01:50:55,320 --> 01:51:02,820 is is a little further ahead than the water park but uh 1412 01:51:00,840 --> 01:51:05,940 I believe it's prior to final of the hotel that they would have to close that 1413 01:51:04,560 --> 01:51:10,860 left out um and put in new signage directing 1414 01:51:08,520 --> 01:51:14,280 people where to go if they want to go back towards town okay I think I 1415 01:51:12,780 --> 01:51:17,219 remember that now thank you appreciate it 1416 01:51:15,659 --> 01:51:21,480 um I think that's it for my questions so um 1417 01:51:20,040 --> 01:51:25,260 if the other Commissioners don't have any other questions of Staff or the 1418 01:51:23,280 --> 01:51:27,900 applicant then we'll move to public comment 1419 01:51:26,219 --> 01:51:30,440 is there anyone that would like to comment 1420 01:51:30,719 --> 01:51:38,880 if not do we have anybody on the phone no callers okay 1421 01:51:35,699 --> 01:51:41,940 moving on to commissioner discussion so I will start off with commissioner 1422 01:51:40,320 --> 01:51:46,820 Marlow again if you have some items you want to 1423 01:51:43,080 --> 01:51:50,940 discuss I no no comment yeah commissioner Conley 1424 01:51:49,080 --> 01:51:56,760 I don't have any further I think commissioner kogler I was on DRC 1425 01:51:55,139 --> 01:52:00,659 and was on the phone call with some of the faces that I can now put names with 1426 01:51:58,320 --> 01:52:04,739 and I think this is a great project I think you've done a phenomenal job on 1427 01:52:02,760 --> 01:52:08,460 the building and you profess to be gung-ho and Landscaping and it's evident 1428 01:52:06,719 --> 01:52:11,760 with what's out there as you drive past your existing facility it stands out 1429 01:52:10,139 --> 01:52:16,260 today and I can't wait to see what your new facility does to tie into that so I 1430 01:52:13,739 --> 01:52:21,659 fully support the project commissioner kovaruvius yep I was also 1431 01:52:18,600 --> 01:52:24,659 on DRC as mentioned and uh I 100 support the project I think you guys have done a 1432 01:52:23,159 --> 01:52:28,020 great job it's going to be a beautiful facility 1433 01:52:26,340 --> 01:52:31,739 um just I think it's gonna be great in fact uh I'm prepared to make a motion if 1434 01:52:30,060 --> 01:52:35,639 we're ready for that I just wanted to comment that I would Echo your uh your 1435 01:52:34,560 --> 01:52:41,460 thoughts um it was a little unfair the photo of 1436 01:52:37,560 --> 01:52:44,699 your Landscaping now but I have been out there when it's really nice and I do 1437 01:52:42,960 --> 01:52:47,699 appreciate that you take such value in it because 1438 01:52:45,840 --> 01:52:51,540 um ordinarily that stretch growing up here in Paso has never been the most 1439 01:52:49,139 --> 01:52:56,880 beautiful location even though I love to fly as well too so yes if there is a 1440 01:52:54,719 --> 01:53:00,480 motion I believe on the table yes sir I'd like to make a motion that we 1441 01:52:58,260 --> 01:53:05,639 approve draft resolution a to adopt the proposed mitigated negative declaration 1442 01:53:03,000 --> 01:53:11,420 and mitigation monitoring and Reporting plan and Item B draft resolution B to 1443 01:53:09,540 --> 01:53:17,639 approve plan development 22-03 along with the added conditions 1444 01:53:15,300 --> 01:53:22,920 for landscaping okay do we have a second on that I will 1445 01:53:20,880 --> 01:53:26,119 second and I will ask I guess does that have to be one motion or two 1446 01:53:27,380 --> 01:53:33,179 making a motion to cover both resolutions is fine in this case then a 1447 01:53:31,500 --> 01:53:37,619 double second it is okay seconded by commissioner kogler 1448 01:53:35,400 --> 01:53:41,699 um roll call what do we have any discussion on that anybody no okay roll 1449 01:53:40,260 --> 01:53:45,900 call commissioner cover rubius aye 1450 01:53:43,679 --> 01:53:52,199 commissioner kogler aye commissioner Marlow aye commissioner Conley aye Mr 1451 01:53:49,320 --> 01:53:59,159 Vice chair Christensen aye so the record will reflect that the 1452 01:53:55,020 --> 01:54:04,679 most in past 5-0 with Neil abstaining for a conflict and we should invite uh 1453 01:54:01,920 --> 01:54:09,900 chairs person Neil back in Katie digiardi okay thank you so much 1454 01:54:07,920 --> 01:54:14,239 and at this time I'll hand it back over to uh chairperson Neil 1455 01:54:27,260 --> 01:54:36,480 thank you very much um glad to be back 1456 01:54:31,860 --> 01:54:44,420 the next agenda item is uh Olson South Chandler specific plan planning Area 13 1457 01:54:40,280 --> 01:54:49,860 vesting tentative track map 3213 and plan development 22-16 1458 01:54:51,380 --> 01:54:59,699 p22-0103 applicant is SG Capital Partners staff 1459 01:54:57,960 --> 01:55:07,020 yes Mr chairman members of the commission this is the uh what's known 1460 01:55:03,480 --> 01:55:12,840 as pa-13 so this is planning area 13. of the uptown Uptown the Olson South 1461 01:55:09,239 --> 01:55:18,179 Chandler specific plan also uh called the Nieto 1462 01:55:14,760 --> 01:55:23,820 so this is these are exhibits out of the specific plan uh the vicinity map there 1463 01:55:21,480 --> 01:55:29,460 is showing all those different colors is the entire Olson South Chandler specific 1464 01:55:27,179 --> 01:55:35,760 plan you can see the numbers in those those areas represent the planning area 1465 01:55:31,920 --> 01:55:42,480 numbers the table on the right hand side indicates the different planning areas 1466 01:55:38,159 --> 01:55:48,239 and the number of units as well as the type of residential that was approved 1467 01:55:46,260 --> 01:55:53,639 with the specific plan so this evening we are looking at this 1468 01:55:51,000 --> 01:55:58,560 area planning area 13. so just to give you a little bit of idea 1469 01:55:55,619 --> 01:56:05,400 of where we are so uh looking up here this is uh Sherwood Road as it comes 1470 01:56:01,800 --> 01:56:10,500 down typically we then turn right on Fontana and then we would hit lynnae and 1471 01:56:08,639 --> 01:56:15,420 then we'd come down to airport so this jog you're all familiar with I may have 1472 01:56:12,659 --> 01:56:20,340 mixed up a few names there but the whole idea is that Sherwood Road will be 1473 01:56:17,760 --> 01:56:24,540 extended along uh here with the Olson South Chandler specific plan and it'll 1474 01:56:22,619 --> 01:56:30,179 come down and then hit in with Meadowlark Road down here 1475 01:56:27,239 --> 01:56:37,139 so this area is is a alignment of the existing Lane Road and this is planning 1476 01:56:33,600 --> 01:56:41,880 Area 13 and this is Hanson Road and then Hanson Road is the current city 1477 01:56:39,360 --> 01:56:45,480 boundaries between the county and the city limits 1478 01:56:43,139 --> 01:56:51,840 so looking up here at planning Area 13 this was an area intended for motor 1479 01:56:48,000 --> 01:57:01,080 motor Court type development there's 129 lots that were around 129 residential 1480 01:56:55,800 --> 01:57:07,199 units approved for a planning area 13. this is out of the specific plan as well 1481 01:57:03,179 --> 01:57:13,500 this is showing the 129 units in these clusters of six uh residential units 1482 01:57:10,679 --> 01:57:19,199 each of these units are on a spec on a separate uh parcel so there's a 1483 01:57:16,880 --> 01:57:24,780 subdivision map that goes along with this the small lot Subdivision map that 1484 01:57:22,199 --> 01:57:30,420 was approved with the Olson South Chandler specific plan uh also approved 1485 01:57:27,659 --> 01:57:33,739 these 129 lots and then these other amenity Lots as well 1486 01:57:34,199 --> 01:57:43,619 so this is again the specific plan and how those six Courtyard units were laid 1487 01:57:40,619 --> 01:57:51,320 out and then the T driveway coming in into the garages so that's the courtyard 1488 01:57:46,980 --> 01:57:51,320 design approved with the specific plan 1489 01:57:51,480 --> 01:58:02,179 so this is a slide that starts to get into what's being proposed tonight with 1490 01:57:56,880 --> 01:58:11,340 STG and this is a STG is proposing 107 Lots so 107 primary 1491 01:58:08,219 --> 01:58:15,840 units so they'd be reducing it from 129 Lots down to 107. so one of the things 1492 01:58:14,159 --> 01:58:21,659 we're looking for the Planning Commission to do tonight is to approve 1493 01:58:17,880 --> 01:58:25,699 that new tentative Subdivision map with the 1494 01:58:22,520 --> 01:58:33,599 107 primary Lots they are asking for a few setback 1495 01:58:30,440 --> 01:58:39,000 reductions but the reason for that is with the 107 Lots this project is 1496 01:58:36,599 --> 01:58:46,020 proposing one excess redwelling unit with each lot be attached to that 1497 01:58:42,659 --> 01:58:51,920 primary unit so this STG plan is a primary unit with a accessory dwelling 1498 01:58:49,020 --> 01:58:58,860 unit with each unit so that is also 1499 01:58:55,679 --> 01:59:06,060 the 107 Lots there's a reduction in the number of the primary units in these 1500 01:59:01,679 --> 01:59:11,159 units so it goes from six down to six uh primary units down to five and then that 1501 01:59:09,360 --> 01:59:14,219 accommodates those accessory dwelling units 1502 01:59:12,320 --> 01:59:18,900 there we're going to talk a little bit about the architectural style and then 1503 01:59:16,860 --> 01:59:23,159 there's some added amenities with this project with the clubhouse and with the 1504 01:59:21,540 --> 01:59:28,739 fitness buildings uh the architect uh Daniel Gammon is 1505 01:59:27,179 --> 01:59:32,880 here tonight he's going to make a presentation so I'm not going to get 1506 01:59:30,540 --> 01:59:35,480 real deep into these site planning and Architectural 1507 01:59:35,880 --> 01:59:41,460 in terms of the accessory dwelling units just wanted to provide a breakdown 1508 01:59:39,659 --> 01:59:47,400 because one of the things if you looked at the project description from the uh 1509 01:59:44,400 --> 01:59:53,340 from the applicant was they requested the modification to reduce the amount of 1510 01:59:50,699 --> 01:59:57,420 open space allowed for the accessory dwelling units so this is just a little 1511 01:59:55,440 --> 02:00:00,540 bit of information on Accessory dwelling units 1512 01:59:58,860 --> 02:00:07,099 um the state law for accessory dwelling 1513 02:00:03,119 --> 02:00:14,820 units as well as the city's ordinance it does not require uh 1514 02:00:11,760 --> 02:00:19,679 open space for accessory dwelling units when they're 800 or less square feet so 1515 02:00:17,639 --> 02:00:24,780 the city does not have the ability to require uh 1516 02:00:21,780 --> 02:00:30,000 open space for accessory dwelling units when they're 800 or less square feet 1517 02:00:27,179 --> 02:00:36,320 there's other things too but the open space is what this project is requesting 1518 02:00:32,659 --> 02:00:36,320 some relief from 1519 02:00:36,540 --> 02:00:45,480 the number of adus that they're proposing is 107 if you look at the 1520 02:00:41,699 --> 02:00:53,460 breakdown the plan 180u is less than 800 square feet at 663. the plan 2 square 1521 02:00:49,619 --> 02:00:59,460 footage is 643 square feet and then the Adu for the plan 3 is slightly over the 1522 02:00:56,760 --> 02:01:05,219 800 square feet but it come to find out that the the actually if we look at the 1523 02:01:01,800 --> 02:01:10,980 design for the Adu for the 847 square feet the 21 situations where that 1524 02:01:08,040 --> 02:01:16,440 happens the open space the private open space is actually provided for on those 1525 02:01:13,860 --> 02:01:19,760 so we can talk about this a little bit more after the presentation from the 1526 02:01:18,060 --> 02:01:25,739 architect the whole idea 1527 02:01:22,580 --> 02:01:29,239 and we'll get to let me get to the STG plan here 1528 02:01:27,659 --> 02:01:34,980 yep relying on Daniel to provide that so the 1529 02:01:32,340 --> 02:01:39,719 whole idea is that their project with the the open space is provided for 1530 02:01:37,260 --> 02:01:45,980 common areas with the amenities with the clubhouse with the fitness center but 1531 02:01:41,880 --> 02:01:52,260 that common open space would provide for uh the open space for whether it's the 1532 02:01:49,380 --> 02:02:00,139 primary units or the accessory dwelling units the primary units have the private 1533 02:01:55,880 --> 02:02:05,219 open space but just in general the intent of this whole area and with 1534 02:02:02,820 --> 02:02:09,360 the specific plans with the Turtle Creek Park with all of the trails there's a 1535 02:02:07,020 --> 02:02:15,000 lot of open space provided for in the specific plan area that is beyond what 1536 02:02:13,080 --> 02:02:20,599 would be uh provided for on each of the individual 1537 02:02:18,060 --> 02:02:26,760 units this is a specific plan so this is this 1538 02:02:24,659 --> 02:02:32,400 is out of the specific plan so there was a wine country element there was a 1539 02:02:30,360 --> 02:02:37,199 progressive Spanish and there was a modern Farmhouse element what you're 1540 02:02:34,800 --> 02:02:42,440 going to see in the presentation is the request for the all of the units to just 1541 02:02:40,380 --> 02:02:47,820 to maintain This Modern Farmhouse architectural style throughout 1542 02:02:45,080 --> 02:02:53,520 there's different color palettes there's different models so they don't all look 1543 02:02:49,800 --> 02:02:58,500 the same but there's a section in the specific plan that indicates that the 1544 02:02:55,619 --> 02:03:03,659 planning areas should have the three different types or the three different 1545 02:03:01,139 --> 02:03:08,460 types of architectural they're proposing to stick with the modern Farmhouse and 1546 02:03:06,179 --> 02:03:14,400 the architect will be able to walk you through the designs on that 1547 02:03:11,940 --> 02:03:20,580 this is the development standards the setbacks the height 1548 02:03:16,219 --> 02:03:25,800 the the landscape the parking this is that courtyard design this 1549 02:03:23,580 --> 02:03:30,780 project as I mentioned will have five primary units instead of six it opens up 1550 02:03:28,560 --> 02:03:35,540 a little more but the main reason is that they're adding those Adu units 1551 02:03:35,639 --> 02:03:43,020 uh the architect will go through this and and indicate kind of the areas and 1552 02:03:40,320 --> 02:03:48,179 get more into uh the request for the setback reductions uh generally along 1553 02:03:45,420 --> 02:03:54,780 the Nay Road uh this is indicating a 10-foot rear yard setback they're 1554 02:03:50,940 --> 02:03:59,760 proposing uh just under nine eight eight feet and some uh and some inches for 1555 02:03:57,840 --> 02:04:04,500 some reductions from the 10 down to eight but they'll be able to he'll be 1556 02:04:01,560 --> 02:04:08,099 able to provide that in his uh presentation 1557 02:04:05,940 --> 02:04:14,400 this is out of the specific plan just indicating the farmhouse style in 1558 02:04:10,380 --> 02:04:14,400 different uh materials 1559 02:04:14,580 --> 02:04:23,280 foreign this is out of the specific plan showing the plan the the cross section 1560 02:04:19,860 --> 02:04:30,599 for Lane Road the two lanes the bike Lanes uh drain bioswells drainage on the 1561 02:04:27,239 --> 02:04:36,840 side and then a 12 foot uh pedestrian bicycle path is being being provided on 1562 02:04:34,500 --> 02:04:42,000 the south side of Lanae road with some additional six feet of landscaping and 1563 02:04:39,239 --> 02:04:48,659 this this is representing the the rear fence the rear property line of these 1564 02:04:44,820 --> 02:04:53,580 pa-13 units which would be here so when we talk about this 10-foot setback from 1565 02:04:51,780 --> 02:04:59,880 this property line to where the building is requesting to be able to reduce down 1566 02:04:56,639 --> 02:05:04,920 to eight uh keep in mind that we've got quite a bit of things happening on the 1567 02:05:02,460 --> 02:05:10,380 right-of-way side before you get to a travel Lane and that's what this is 1568 02:05:07,380 --> 02:05:16,800 graphic is representing so what we're looking at this evening is 1569 02:05:13,020 --> 02:05:21,560 a request to approve the vesting tentative map for pa-13 along with the 1570 02:05:20,099 --> 02:05:27,440 development plan and then there are other options 1571 02:05:25,340 --> 02:05:34,380 to modify option A or refer back to staff 1572 02:05:31,199 --> 02:05:42,260 or make findings for denial one thing to keep in mind is the STG 1573 02:05:39,980 --> 02:05:49,320 map the truck 3213 as long as well as development plan 1574 02:05:45,980 --> 02:05:54,300 2216. this would set up a second option for this pa-13 property the first option 1575 02:05:52,739 --> 02:06:00,840 is what was approved in the specific plan so the the 1576 02:05:57,320 --> 02:06:08,280 129 units along with the specific plan development standards still would be an 1577 02:06:04,800 --> 02:06:15,239 entitlement for this pa-13 so that along with this project would have options uh 1578 02:06:12,000 --> 02:06:20,760 the STG group is in contract to be purchase pa-13 they want to make sure 1579 02:06:19,139 --> 02:06:24,900 that their entitlements of what they want to do is established what this is 1580 02:06:23,159 --> 02:06:31,980 about what's being proposed with these applications uh but there will be the 1581 02:06:28,080 --> 02:06:36,360 point where escrow is closed STG would then have the ability to move forward 1582 02:06:33,420 --> 02:06:41,099 with their plans which if they approve tonight would be that option if for some 1583 02:06:39,179 --> 02:06:49,980 reason that that escrow doesn't happen and this TG doesn't end up purchasing 1584 02:06:43,860 --> 02:06:56,699 this pa13 the current uh uh owner the Olsen 212 LLC could still rely upon that 1585 02:06:53,880 --> 02:07:01,020 original plan uh with the specific plan for development so those that's two 1586 02:06:58,800 --> 02:07:06,119 options there'll be a point where there's a map that tentative map whether 1587 02:07:03,719 --> 02:07:10,020 it's this map or the previous gets recorded at what point that the maps 1588 02:07:08,400 --> 02:07:14,400 recorded then that accompanying development plan and this or the 1589 02:07:12,060 --> 02:07:18,540 specific plan would need to then follow up with the design in relation to that 1590 02:07:16,860 --> 02:07:23,540 map but with that I'd be happy to answer any 1591 02:07:21,360 --> 02:07:30,199 questions but also the architect is here to we have a 1592 02:07:26,940 --> 02:07:30,199 presentation Cuda 1593 02:07:30,540 --> 02:07:37,139 great thank you Darren and please join us 1594 02:07:35,340 --> 02:07:41,520 uh my name is Daniel Gaiman with danielian Associates and we have been 1595 02:07:39,480 --> 02:07:46,920 The Architects for this project and I believe I have Adam and Ryan one of the 1596 02:07:43,679 --> 02:07:51,060 other or both on the phone yeah I'm uh Adam tankrini from STG is on 1597 02:07:50,219 --> 02:07:56,099 the phone awesome thanks Adam 1598 02:07:53,219 --> 02:07:59,280 um so I'm going to introduce and walk through in a little bit more detail some 1599 02:07:57,960 --> 02:08:02,940 of these fine points for this project but I just have to say this I'm so glad 1600 02:08:01,139 --> 02:08:07,260 that we got to go after Triana winery because 1601 02:08:04,260 --> 02:08:11,520 has been said that homes is where Jobs go to sleep at night and so I I can 1602 02:08:09,840 --> 02:08:16,679 imagine some of the people they will have there living in the uh in p13 and 1603 02:08:15,480 --> 02:08:21,900 one we're going to come up with a groovy name for it eventually as well 1604 02:08:18,840 --> 02:08:26,460 um so uh Darcy can I have the Marcy sorry we have a Marcia and Darcy okay 1605 02:08:23,460 --> 02:08:26,460 Marcy 1606 02:08:32,219 --> 02:08:38,179 so what I want to do in the presentation is first give a little background on how 1607 02:08:36,900 --> 02:08:44,940 this became fewer structures on the 16 Acres but 1608 02:08:42,480 --> 02:08:48,659 with more households in it um the the guys at sgg were very 1609 02:08:46,800 --> 02:08:54,119 interested in fulfilling some of the some of the dreamy intentions of the 1610 02:08:51,239 --> 02:08:59,280 specific plan which include providing a range of housing types and a range of 1611 02:08:56,040 --> 02:09:03,360 price points by introducing accessory dwelling units into this neighborhood 1612 02:09:01,020 --> 02:09:09,179 that's in fact happening um because they are they're they're 1613 02:09:04,920 --> 02:09:12,599 modestly sized uh and they are what we call naturally occurring affordable 1614 02:09:10,980 --> 02:09:16,320 housing in some cases because they're just smaller units the homes themselves 1615 02:09:14,099 --> 02:09:20,400 are modestly sized they're primaries and then the accessory dwelling units by 1616 02:09:18,599 --> 02:09:25,159 Design are roughly half the square footage of what each primary residence 1617 02:09:22,920 --> 02:09:25,159 is 1618 02:09:29,940 --> 02:09:32,480 hmm 1619 02:09:39,119 --> 02:09:43,980 Adam do you want to um we're waiting for the up for the presentation to come up 1620 02:09:42,900 --> 02:09:48,360 do you want to just give a quick introduction of how you guys came 1621 02:09:46,020 --> 02:09:52,739 abreast of the adding accessory doiling units concept 1622 02:09:50,820 --> 02:09:57,060 yeah sure Daniel um so uh first off thank you everyone 1623 02:09:55,260 --> 02:10:01,080 for your time tonight I appreciate everyone's accommodation of adding us to 1624 02:09:59,280 --> 02:10:05,280 this schedule on this thing so thank you for that 1625 02:10:02,460 --> 02:10:09,900 um but yeah to Daniel's question um when we first looked at this at this 1626 02:10:08,280 --> 02:10:14,219 PA 13 um and we are in our background is 1627 02:10:12,239 --> 02:10:17,760 hoping um apartment development as well as 1628 02:10:15,900 --> 02:10:22,260 industrial but um we we were struggling with the fact 1629 02:10:21,060 --> 02:10:31,159 that the entire master plan Community yeah 1630 02:10:26,699 --> 02:10:31,159 I really didn't have 1631 02:10:32,159 --> 02:10:38,880 built the red scale um and that's uh you know it's if you're 1632 02:10:36,300 --> 02:10:43,920 reading the news or you know looking at what's going on in the world today the 1633 02:10:40,020 --> 02:10:48,960 build to rent Market is is so important and it's so needed uh you know there's a 1634 02:10:47,520 --> 02:10:52,199 lot of that middle class that can't necessarily afford a home but they want 1635 02:10:50,760 --> 02:10:57,000 the home lifestyle and what we've done here is essentially 1636 02:10:54,420 --> 02:11:04,199 that is provided something that's really missing from this overall community 1637 02:11:00,179 --> 02:11:07,800 that can allow a young family that's in the area 1638 02:11:05,460 --> 02:11:12,900 um the ability to have that that was really important uh essentially 1639 02:11:10,440 --> 02:11:18,239 for us uh you know as developers and also you know 1640 02:11:15,840 --> 02:11:23,820 having families themselves uh really wanted to provide uh for this community 1641 02:11:20,280 --> 02:11:29,280 so that that was kind of the the initial thought process and then also looking at 1642 02:11:26,460 --> 02:11:33,960 it from unmarkability standpoint of how do we differentiate ourselves from you 1643 02:11:31,320 --> 02:11:38,340 know kehov or Shea Homes uh the trilogy project uh how do we stand out and and 1644 02:11:36,599 --> 02:11:42,480 not necessarily compete with them but create more value overall for the entire 1645 02:11:40,440 --> 02:11:45,840 master plan community so that's that's how we came about this and perfect 1646 02:11:43,860 --> 02:11:48,920 timing Adam because we now have the presentation ready to rock 1647 02:11:49,860 --> 02:11:57,739 um great so can I have the next one this is great so whoops 1648 02:11:56,580 --> 02:12:03,480 um oh it's not I can just say next I I know 1649 02:12:01,800 --> 02:12:08,099 it pretty well so um okay so this this is all the heavy 1650 02:12:06,239 --> 02:12:12,540 lifting um in terms of the things we're asking for it's the the two tables are 1651 02:12:10,679 --> 02:12:16,560 the elements of the modern farm house style and the development standards for 1652 02:12:14,940 --> 02:12:20,940 the Mordecai so you see a lot of green printing because that's what we have 1653 02:12:18,239 --> 02:12:25,080 conformed with um most of the requirements there are a few that we had 1654 02:12:23,219 --> 02:12:28,560 to Elbow our way through a little bit in order to get the accessory dwelling 1655 02:12:26,760 --> 02:12:33,119 units to work with the primary residents I mentioned before on the right hand 1656 02:12:30,719 --> 02:12:38,639 side just some key points that we started with a specific plan 1657 02:12:36,119 --> 02:12:44,219 um that stresses attainable housing opportunities we went and includes 1658 02:12:41,880 --> 02:12:48,719 accessory dwelling units as a permitted use within the specific plan area 1659 02:12:47,340 --> 02:12:52,619 um then it refers you to the city's housing element which some of the goals 1660 02:12:50,639 --> 02:12:58,020 policies and action items include providing an array of housing options 1661 02:12:55,320 --> 02:13:01,679 for people at an array of income levels and uh specifically through the 1662 02:13:00,360 --> 02:13:04,980 promotion of the accessory dwelling units and then I won't bore you with the 1663 02:13:03,300 --> 02:13:09,540 details but there's a few wonky points from the state Adu law that Darren 1664 02:13:07,500 --> 02:13:15,119 already referred to um that talks about how these homes each 1665 02:13:12,060 --> 02:13:19,139 home is entitled to have one of these by state law within the sort of boundaries 1666 02:13:17,460 --> 02:13:24,599 that are defined there again I won't read that point for point so that's the 1667 02:13:21,480 --> 02:13:29,219 heavy lifting and I'm going to um at DRC there were a lot of questions 1668 02:13:26,400 --> 02:13:34,380 about how does this property how is it managed because Adam mentioned built to 1669 02:13:32,280 --> 02:13:39,420 rent and so the intention of this community is that all of the units are 1670 02:13:37,139 --> 02:13:43,260 rented the primary residences are and the accessory dwelling units are as well 1671 02:13:41,159 --> 02:13:48,420 so we've just put together a quick few quick bullet points kind of the next 1672 02:13:45,000 --> 02:13:54,060 slide please on how the management will work and it will also address if there's 1673 02:13:51,239 --> 02:14:00,239 ever a possibility of a for sale exit strategy from the project 1674 02:13:57,960 --> 02:14:04,079 and Adam if you uh can can speak it we're still hoping the slide will come 1675 02:14:02,460 --> 02:14:08,840 up soon and if you have the presentation 1676 02:14:05,400 --> 02:14:08,840 yourself can you wing it from that 1677 02:14:14,159 --> 02:14:16,340 foreign 1678 02:14:29,040 --> 02:14:35,219 I'm I'm here I'm breaking up though what did you just ask Daniel sorry sorry 1679 02:14:33,599 --> 02:14:39,300 we're again we're having technical difficulties here and I'm hoping that 1680 02:14:37,139 --> 02:14:44,040 while we fill the space you can speak to the management issues which would be 1681 02:14:40,619 --> 02:14:48,960 slide three in the package event yeah absolutely so like Daniel said you know 1682 02:14:46,800 --> 02:14:52,139 you know rental units um 1683 02:14:49,980 --> 02:15:00,119 show you that we've we've actually added amenities to this specific PA of a 1684 02:14:57,659 --> 02:15:07,079 clubhouse which also acts as a leasing office a wine tasting room uh and a Rec 1685 02:15:02,880 --> 02:15:10,860 Center as well as a workout facility uh Pool and Spa 1686 02:15:09,119 --> 02:15:15,659 um so you have a your Resort style amenities for a beautiful housing 1687 02:15:13,500 --> 02:15:19,619 community which is going to be great so the management is going to be a third 1688 02:15:17,340 --> 02:15:22,679 party management company as as is as if you would manage like an apartment 1689 02:15:20,820 --> 02:15:27,300 complex um you know we when we were talking with 1690 02:15:24,900 --> 02:15:32,460 city council or excuse me Planning Commission on the uh the DRC 1691 02:15:30,900 --> 02:15:37,260 um you know some questions were asked about you know well what happens if you 1692 02:15:34,800 --> 02:15:41,280 know you sell some of these Lots or you don't well the buyer of this particular 1693 02:15:39,480 --> 02:15:45,540 project is going to be essentially buying the entire Community 1694 02:15:43,739 --> 02:15:51,719 um even though you're able to option off and and sell uh a single lot at a time 1695 02:15:49,440 --> 02:15:56,579 um you know we are open to having a deed restriction uh on the property so that 1696 02:15:53,880 --> 02:16:01,380 doesn't happen even though we've done projects in Bill Durant where we've 1697 02:15:59,219 --> 02:16:06,619 essentially sold off um half half of the units and it doesn't 1698 02:16:04,679 --> 02:16:10,980 necessarily matter because there is a sub-association if that would happen 1699 02:16:08,460 --> 02:16:15,000 that would then partake with the third party management and they would keep 1700 02:16:13,139 --> 02:16:20,760 that management going even after the houses are sold to still manage those 1701 02:16:17,340 --> 02:16:24,780 amenities and that process so um I hope that answers some of the 1702 02:16:22,560 --> 02:16:28,380 questions if not I'm happy to answer any other questions and get more and more 1703 02:16:25,980 --> 02:16:32,340 detail you know down the line if any commissioner has any any question 1704 02:16:30,000 --> 02:16:37,200 options on that great thanks Adam I mean we are back up and running I think let 1705 02:16:34,380 --> 02:16:42,960 me see ah yes so um Darren already showed this this is this the site plan 1706 02:16:39,359 --> 02:16:49,219 that was included in the specific plan this is our proposed site plan Darren 1707 02:16:46,320 --> 02:16:53,939 already explained that sometimes in the nomenclature of motor Court housing 1708 02:16:51,899 --> 02:16:58,500 they're known as a six-pack or an eight pack and so we changed them from six 1709 02:16:56,160 --> 02:17:03,420 packs to five packs for this very critically important reason that to have 1710 02:17:01,679 --> 02:17:07,859 six houses in there we were left without adequate parking spaces for the 1711 02:17:05,760 --> 02:17:12,780 accessory dwelling units so by reducing a six-pack to a five pack 1712 02:17:09,960 --> 02:17:17,399 um we have at a in the auto court itself a surface parking space for each of the 1713 02:17:15,719 --> 02:17:21,179 accessory dwelling units that are in the cluster so that was really important in 1714 02:17:19,740 --> 02:17:24,960 this and Darren mentioned it does kind of open up the space in the middle of 1715 02:17:22,620 --> 02:17:31,500 that motor court but I'll show you in a moment but um the uh 1716 02:17:29,040 --> 02:17:35,160 I wanted to go back for one second the their Landscaping Pockets throughout the 1717 02:17:33,840 --> 02:17:39,240 site um at the North along lynnae there's a 1718 02:17:37,800 --> 02:17:44,179 square at the end of each of the public streets I don't have the laser pointers 1719 02:17:40,800 --> 02:17:49,500 that I'm here too it is awesome okay Okay so 1720 02:17:47,280 --> 02:17:54,540 there's a pocket part there's a pocket part there's a pocket part there's this 1721 02:17:51,660 --> 02:17:58,200 internal Paseo that runs most of the length of the western side of the 1722 02:17:56,099 --> 02:18:03,719 property and then we have our clubhouse in leasing there and uh a cool a pool 1723 02:18:01,439 --> 02:18:09,359 core and a fitness room specialty Fitness and a dog run so there's lots of 1724 02:18:06,540 --> 02:18:14,840 open space around the site I just want to show you a couple of those more 1725 02:18:10,439 --> 02:18:14,840 closely this is um whoops sorry 1726 02:18:15,540 --> 02:18:22,439 uh uh that is a nicely appointed and 1727 02:18:20,399 --> 02:18:27,000 Landscape pocket park there are slightly different and that's the nature of the 1728 02:18:24,300 --> 02:18:31,320 Paseo so the house and then it's uh yard captured and then a public walking space 1729 02:18:29,580 --> 02:18:35,099 in between the whole Community was designed to be very highly walkable 1730 02:18:33,660 --> 02:18:39,479 um lots of sidewalks to lead you to those common amenity spaces 1731 02:18:37,939 --> 02:18:45,780 so um this is the six pack cluster plan 1732 02:18:42,420 --> 02:18:50,399 from the specific plan and this is our modified five pack plant 1733 02:18:48,599 --> 02:18:53,700 what we've done is added this diagram from the from the DRC for those of you 1734 02:18:52,320 --> 02:18:57,240 who were there um to distinguish between the primary 1735 02:18:55,679 --> 02:19:01,500 residence and the accessory dwelling units and here it's very easy the 1736 02:18:58,679 --> 02:19:07,859 primaries are are in Gray and the accessory dwelling units are in blue 1737 02:19:04,320 --> 02:19:12,300 um so what we've shown is Pathways from the Adu parking spaces there and how 1738 02:19:10,019 --> 02:19:15,359 they access the front door of their dwelling 1739 02:19:13,679 --> 02:19:19,559 um one has to walk a little bit further than the others 1740 02:19:16,920 --> 02:19:23,219 um these guys come out in a round to get into their accessory dwelling unit with 1741 02:19:21,660 --> 02:19:28,019 the set the different entries and the different approaches to the dwellings it 1742 02:19:25,859 --> 02:19:32,580 kind of tweaks the idea of is a yard a front yard a side yard or a rear yard in 1743 02:19:30,719 --> 02:19:36,479 some cases but generally speaking that's how people circulate around the site 1744 02:19:35,040 --> 02:19:42,059 again I mentioned earlier that each accessory dwelling unit is about half 1745 02:19:38,340 --> 02:19:46,679 the size by lot of the primary dwelling unit the um there are two plans here 1746 02:19:44,939 --> 02:19:51,420 that are right around 14 100 square feet for the primary unit and the adus are 1747 02:19:49,020 --> 02:19:59,300 less than 700 we have one bigger home that's at 1700 square feet which is Plan 1748 02:19:53,760 --> 02:19:59,300 Three and it's adus that's 840 or so 1749 02:20:00,120 --> 02:20:05,700 this is a diagram to highlight the variances from setbacks that we're 1750 02:20:04,500 --> 02:20:10,859 requesting um the yellow highlighted areas we had 1751 02:20:08,460 --> 02:20:14,160 the backyards reduced to something less than 10 feet it varies a little bit 1752 02:20:12,479 --> 02:20:18,120 because the houses are orthogonal and the property lines are not so it's a 1753 02:20:16,260 --> 02:20:24,180 teeny tiny little wedge there that makes the dimension variable 1754 02:20:21,120 --> 02:20:29,820 um on this side where that home that's planned to is on an outside corner 1755 02:20:27,140 --> 02:20:35,820 requires a deeper yard than it typically would and we have varied that in that 1756 02:20:33,000 --> 02:20:41,760 situation that occurs eight times in the property and then down here these two 1757 02:20:39,000 --> 02:20:46,979 homes were already really Compact and to make the accessory dwelling units work 1758 02:20:43,319 --> 02:20:50,580 in those homes we reduce their front yard setback a little bit but they're 1759 02:20:48,960 --> 02:20:55,200 still they set that beyond the sidewalk plus a tree line and I'll have a photo 1760 02:20:52,560 --> 02:20:59,220 to show you that later where the entry to the homes have we're trying to treat 1761 02:20:56,880 --> 02:21:03,660 them as almost like a brownstone kind of walk up into front outdoor sort of 1762 02:21:01,439 --> 02:21:09,020 situation so that's just a quick illustration of the variances having to 1763 02:21:06,000 --> 02:21:09,020 do with with yards 1764 02:21:09,300 --> 02:21:14,819 this was the proposed landscape plan from this specific plant I just want you 1765 02:21:13,319 --> 02:21:19,620 to know quickly the sort of placement of the trees and pockets of planting 1766 02:21:17,760 --> 02:21:24,420 this is sorry it's a little bit smaller but here the the number of three Street 1767 02:21:22,140 --> 02:21:28,800 trees and internal cluster trees are the same and the pockets of planting are 1768 02:21:26,880 --> 02:21:33,560 stunningly similar from um our proposal to the specific plan 1769 02:21:34,380 --> 02:21:40,560 and just to really blow it up for you this is backyards along Lynnette and uh 1770 02:21:38,760 --> 02:21:44,460 reduced from the 10 to somewhat less and you can see different Furniture 1771 02:21:41,640 --> 02:21:48,180 Arrangements that are placed in there uh that actually show their usable space 1772 02:21:45,960 --> 02:21:51,960 and some of the space is for Adu and some of it is for primary house so the 1773 02:21:49,859 --> 02:21:54,979 kind of side by side with fences in between them for privacy 1774 02:21:55,800 --> 02:22:01,859 and here are some images um one big shift from DRC for those of 1775 02:21:59,760 --> 02:22:05,700 you who are at DRC we received the comment asking us about the fence design 1776 02:22:03,420 --> 02:22:11,819 that separated these yards from the bike path and all that Landscaping on lynnae 1777 02:22:07,500 --> 02:22:15,300 and uh that has been worked through and working with planning stuff thank you 1778 02:22:13,140 --> 02:22:19,979 Darren we have proposed an alternate fence there that instead of what we call 1779 02:22:17,580 --> 02:22:25,080 Zoo fence which is just pickets we went to a more solid we kept the brick base 1780 02:22:22,020 --> 02:22:29,819 in the in the stone the pie lasters but filled that in with a more solid fence 1781 02:22:27,540 --> 02:22:33,000 and it just makes these yards so much more private than that open fence did 1782 02:22:31,620 --> 02:22:37,740 when he showed the streak diagram earlier you could see that sort of zoo 1783 02:22:34,920 --> 02:22:41,160 style fence and uh a combination of folks that just wasn't the right thing 1784 02:22:39,300 --> 02:22:48,260 even though the specific plan required that so we've adapted this from other 1785 02:22:44,060 --> 02:22:48,260 fence types in the specific plant 1786 02:22:48,780 --> 02:22:55,140 this is an aerial view of of the cluster itself 1787 02:22:52,800 --> 02:22:59,460 um you can see how the Adu parking spaces which are here open up uh the 1788 02:22:57,899 --> 02:23:03,240 space a lot more and what that has the effect of doing is giving more windows 1789 02:23:01,500 --> 02:23:08,420 on each house exposure to light so that's sort of a nice perk of having the 1790 02:23:05,340 --> 02:23:08,420 five instead of the six 1791 02:23:10,080 --> 02:23:16,260 um just a couple of other views the one on the left is is more street view into 1792 02:23:13,979 --> 02:23:20,460 the court and the one on the right shows the plan one that I mentioned where we 1793 02:23:18,240 --> 02:23:23,000 have reduced the yard requirement along there 1794 02:23:21,600 --> 02:23:29,160 um by three feet and we have all of the entries to that 1795 02:23:26,640 --> 02:23:34,140 home are articulated with this nice porch element that they are they frame 1796 02:23:32,340 --> 02:23:37,680 the entry into the court so we like that sort of walkable quality 1797 02:23:36,120 --> 02:23:40,939 um staying consistent with that throughout the neighborhood 1798 02:23:41,640 --> 02:23:50,520 there's a view along lynnae um this is our uh visualization of the 1799 02:23:48,420 --> 02:23:53,700 section that Darren showed earlier and that's the changed fence that creates 1800 02:23:52,439 --> 02:23:57,540 the Privacy for those yards because there is an awful lot going on out here 1801 02:23:55,740 --> 02:24:02,939 and starting The Pedestrian and bike path uh and there you can just see a 1802 02:24:00,180 --> 02:24:06,359 flat flatter view that's our that's the biggest house the biggest Adu in the 1803 02:24:04,859 --> 02:24:09,720 plan is the one that stretches along what is the backyard 1804 02:24:08,700 --> 02:24:15,180 foreign just just a quick word on the clubhouse 1805 02:24:12,479 --> 02:24:19,260 amenity it is it functions as the leasing because this is intended to be a 1806 02:24:17,040 --> 02:24:22,740 built a rental Community um and lots of features there's just a 1807 02:24:21,060 --> 02:24:26,280 ton of indoor outdoor space and I'll show you a rendering of that and in a 1808 02:24:25,380 --> 02:24:30,420 moment because basically this whole 1809 02:24:27,960 --> 02:24:36,180 neighborhood was approached as if it were a multi-family apartment community 1810 02:24:33,479 --> 02:24:40,200 um and so typically you see nice lavish amenities and these for the number of 1811 02:24:38,280 --> 02:24:45,420 units are out here totally we went for 129 lots to 107 but there's two two 1812 02:24:43,200 --> 02:24:50,700 dwellings in each of those so it's a total of 214 households 1813 02:24:47,760 --> 02:24:56,100 um here and the amount of amenity that STG is proposing for that many 1814 02:24:53,399 --> 02:24:58,700 households is really lavish it's it's like a resort 1815 02:24:58,920 --> 02:25:05,160 um so it just lists some of the features that we have going on there and then uh 1816 02:25:03,420 --> 02:25:09,899 that's a little shot of the back of that ins that doesn't face the street this is 1817 02:25:07,380 --> 02:25:14,600 faces back into the property of the shared community space leasing Center 1818 02:25:11,880 --> 02:25:14,600 and so on 1819 02:25:14,880 --> 02:25:22,020 and then this is the the pool it's quite a large pool a spa 1820 02:25:19,439 --> 02:25:25,680 um a fitness room and a specialty Fitness room and a sort of pathway 1821 02:25:23,580 --> 02:25:30,120 between them you can just want to point out right there this this is a very uh 1822 02:25:28,260 --> 02:25:33,899 nice path that comes down for the rest of the community and leads into this 1823 02:25:32,280 --> 02:25:38,000 open space which is shared by everyone in the community the dog park is over 1824 02:25:35,819 --> 02:25:38,000 here 1825 02:25:38,819 --> 02:25:45,840 that this is one of my favorite parts of the site this is that um pathway that 1826 02:25:42,960 --> 02:25:52,140 leads you down into the area of all the outdoor recreation the active Recreation 1827 02:25:48,540 --> 02:25:57,300 um the pool uh specialty Fitness and fitness rooms 1828 02:25:53,760 --> 02:26:01,800 and that might be it oh no so this this I can enlarge this 1829 02:26:00,240 --> 02:26:07,200 but let me talk about parking for a moment the um we were concerned about 1830 02:26:04,439 --> 02:26:11,880 that from the beginning and a nice feature about there's that's a public 1831 02:26:09,300 --> 02:26:16,140 road that's a public road that and that are both public roads so we have lots of 1832 02:26:13,439 --> 02:26:20,520 public roads sort of interfaced with our community and along all of those and 1833 02:26:18,540 --> 02:26:24,720 also along Parkview which is the street at the end you can see these teeny tiny 1834 02:26:22,319 --> 02:26:30,780 hash marks there we have on-street parking all over so 1835 02:26:27,540 --> 02:26:36,420 um within 107 Lots each primary residence has two parking spaces in a 1836 02:26:33,720 --> 02:26:41,760 garage each accessory dwelling unit has one surface parking space within the 1837 02:26:39,000 --> 02:26:47,460 cluster so they're all parked on that basis and then in addition to that there 1838 02:26:43,740 --> 02:26:54,120 are 121 Street spaces so if you take all that math together that works out about 1839 02:26:50,220 --> 02:26:58,080 um four parking spaces per lot so those parking is very generous throughout the 1840 02:26:56,700 --> 02:27:01,979 neighborhood that was a concerned really early on in the planning process and we 1841 02:27:00,720 --> 02:27:05,960 thought we believe that we've really held that and honored that requirement 1842 02:27:06,560 --> 02:27:13,680 and as Darren referred to earlier I know my my friends at STG are just really 1843 02:27:11,880 --> 02:27:17,040 rare to go on this we're very excited about it and once again I'm so glad to 1844 02:27:15,540 --> 02:27:20,880 have followed that Winery project that's bringing jobs to Paso and we're bringing 1845 02:27:19,380 --> 02:27:26,700 homes for those people to come home and sleep in so that's um just a quick tour 1846 02:27:24,540 --> 02:27:31,140 through what was proposed and what we have now and I'm happy to answer 1847 02:27:28,260 --> 02:27:37,520 questions as well great thank you very much 1848 02:27:33,479 --> 02:27:37,520 um commissioner Christian questions 1849 02:27:38,640 --> 02:27:43,819 uh just a couple questions um 1850 02:27:44,100 --> 02:27:51,540 the uh the different floor plans Darren so you're asking the commission tonight 1851 02:27:49,740 --> 02:27:54,960 to um 1852 02:27:52,620 --> 02:27:59,280 allow the applicant to just go with one plan 1853 02:27:56,340 --> 02:28:04,140 one rendering planner elevation plan sorry no 1854 02:28:01,200 --> 02:28:08,399 um I think there are many there's three different plans and other elevations so 1855 02:28:06,240 --> 02:28:13,399 there's multiple architectural plans proposed I think uh what I was trying to 1856 02:28:11,040 --> 02:28:18,660 say was the specific plan indicated three architectural themes right uh and 1857 02:28:17,220 --> 02:28:22,800 what we're looking for is just kind of the one architectural theme and Daniel 1858 02:28:20,760 --> 02:28:28,500 maybe you can hit on that a little bit more is the what's being proposed is the 1859 02:28:26,100 --> 02:28:32,819 modern Farmhouse which is a permitted style in the specific plan but these 1860 02:28:31,020 --> 02:28:38,280 they're looking at doing that style throughout all the the 107 buildings 1861 02:28:36,620 --> 02:28:43,800 they're going to have different variations of that throughout but so 1862 02:28:41,460 --> 02:28:50,819 what I was just bringing to the planning commission's attention was the uh the 1863 02:28:48,479 --> 02:28:54,000 one farmhouse style and then they're just gonna do variations of the 1864 02:28:52,020 --> 02:28:58,220 particular style and they're not going to have a Spanish style and they're not 1865 02:28:56,100 --> 02:28:58,220 going to 1866 02:28:58,340 --> 02:29:04,620 and there was an interest there was a philosophical position behind doing that 1867 02:29:02,100 --> 02:29:08,340 as well is that we wanted the a whole neighborhood to read as a village that 1868 02:29:07,200 --> 02:29:15,479 had a kind of um a uniformity among the dwellings and 1869 02:29:12,060 --> 02:29:19,500 then on the two uh common area buildings out in front we call the leasing Center 1870 02:29:17,640 --> 02:29:23,939 Clubhouse we always call that the big house because it's the most articulated 1871 02:29:21,780 --> 02:29:28,260 the most ornamented building in the entire neighborhood and then the fitness 1872 02:29:25,920 --> 02:29:32,520 room is the barn and so it's architecture kind of reflects that so we 1873 02:29:30,600 --> 02:29:38,220 wanted a homogeneity among where the residents were a spectacular bit for the 1874 02:29:36,060 --> 02:29:43,620 leasing and Clubhouse and then kind of a nudge wink wink to the local agriculture 1875 02:29:41,100 --> 02:29:49,140 with the fitness building okay thank you 1876 02:29:45,300 --> 02:29:53,520 um so the the other question I had was um could 1877 02:29:51,600 --> 02:29:57,899 you clarify again it was it kind of seemed a little confusing for the 1878 02:29:55,319 --> 02:30:01,520 setback changes where the locations will be that that the applicants requesting 1879 02:30:00,960 --> 02:30:06,020 um the setback uh allowances 1880 02:30:07,500 --> 02:30:10,819 boy I don't know what I did here 1881 02:30:11,939 --> 02:30:14,780 someone else 1882 02:30:14,939 --> 02:30:25,020 got it okay this is a this exhibit I think is good this is so the that five 1883 02:30:22,859 --> 02:30:30,600 pack is the essential cluster there are 21 clusters and one half cluster that 1884 02:30:27,240 --> 02:30:36,120 make up the overall community and the um the two on the bottom 1885 02:30:32,880 --> 02:30:41,160 is is that setback we asked to go from eight to three uh eight to five so that 1886 02:30:38,819 --> 02:30:46,439 reduced uh by three feet this one where this primary residence is 1887 02:30:44,760 --> 02:30:50,760 not tucked on the inside of the cluster but is outside on a street face that 1888 02:30:48,960 --> 02:30:55,920 setback also went from 10 to a little bit under 10. um that occurs eight times 1889 02:30:53,580 --> 02:31:00,180 throughout the entire community and then here the backyards generally 1890 02:30:58,140 --> 02:31:04,439 were reduced from We're asked for a reduction from 10 to somewhat less than 1891 02:31:02,580 --> 02:31:08,819 10 and I wish I could be super specific but it varies because it's not parallel 1892 02:31:07,260 --> 02:31:14,100 um some of them get as high as nine and change so it's just a move away from the 1893 02:31:12,120 --> 02:31:17,760 10 and that is um everywhere that backyard occurs and 1894 02:31:15,840 --> 02:31:22,620 sometimes the Clusters rotate through the plans so that's highlights where 1895 02:31:20,460 --> 02:31:27,240 we're asking for variance on setbacks okay 1896 02:31:24,300 --> 02:31:29,580 um and then the last clear or well one of the other clarifications I had was 1897 02:31:28,439 --> 02:31:35,220 there were uh 107 adus and 21 of those would be 1898 02:31:33,060 --> 02:31:39,899 over 800 square feet yes and then the the remainder of 86 would be under 850 1899 02:31:39,060 --> 02:31:43,680 square feet is that correct significantly under they're actually 1900 02:31:41,040 --> 02:31:47,399 under 700 so okay um 1901 02:31:44,520 --> 02:31:50,819 and then for staff what other uh well I guess maybe this is for David and I 1902 02:31:49,260 --> 02:31:53,340 think I know the answer to this but I just want to confirm this 1903 02:31:52,740 --> 02:31:57,800 um when we did this specific plan uh I know 1904 02:31:56,280 --> 02:32:04,740 that there were mitigation issues for traffic and 1905 02:32:01,859 --> 02:32:08,340 um uh utilities things like that so they weren't required to go through because 1906 02:32:06,300 --> 02:32:12,120 they're calling them adus and because they're adus we didn't have to do 1907 02:32:10,680 --> 02:32:16,020 anything else with traffic with new units right 1908 02:32:13,439 --> 02:32:21,479 that's correct so we can't require any mitigations for adus but the full 1909 02:32:19,680 --> 02:32:27,300 traffic mitigations for the entire project still apply to pa-13 in all the 1910 02:32:24,359 --> 02:32:31,859 Pas I'm sorry what was the last part all the mitigation measures so those have 1911 02:32:29,220 --> 02:32:39,660 been carried forward from PA 13's map that the first one to this map so 1912 02:32:35,220 --> 02:32:45,300 traffic water sewer all that is this still applies to this map but the 107 1913 02:32:42,240 --> 02:32:49,439 units the traffic generated from that um we can't require any kind of 1914 02:32:46,920 --> 02:32:52,380 mitigation to that traffic okay thank you thanks for clarifying that David I 1915 02:32:50,819 --> 02:32:57,300 appreciate it um I don't have any other questions at this time 1916 02:32:54,479 --> 02:33:02,760 commissioner comma well uh commissioner Christensen uh kind 1917 02:33:00,060 --> 02:33:08,880 of hit on some of my concerns the uh the specific plan for this uh has 1918 02:33:07,439 --> 02:33:15,120 a uh 1919 02:33:10,500 --> 02:33:19,800 a thousand 293 residential units that it applied and 1920 02:33:17,180 --> 02:33:26,340 essentially what this plan does is take the 1921 02:33:22,040 --> 02:33:31,800 129 and makes it 1 107 but at the same time it splits 1922 02:33:28,380 --> 02:33:36,960 the primary resident with a Adu auxiliary dwelling unit and so I 1923 02:33:35,760 --> 02:33:43,439 guess it's more to Dave again 1924 02:33:39,560 --> 02:33:47,280 what I see is an 85 increase in dwelling units because you're going 1925 02:33:46,319 --> 02:33:54,600 from you're going from 129 to 107 but then 1926 02:33:51,120 --> 02:34:00,920 you're adding 107 in so the Delta is 85 more units and by itself 1927 02:33:58,740 --> 02:34:05,040 on the specific plan with all of these total 1928 02:34:02,840 --> 02:34:11,880 1293 units might not be significant but if we take 1929 02:34:08,340 --> 02:34:21,780 the next one which might be residential number five pa5 and we end up having a 1930 02:34:16,939 --> 02:34:26,760 adus on that and adus on the others and my point is that if you have a traffic 1931 02:34:24,600 --> 02:34:32,460 study that's based on X number of dwelling units that generate 1932 02:34:29,520 --> 02:34:40,080 X number of trips you have something that's X Plus Y in this case the Y would 1933 02:34:36,240 --> 02:34:45,899 be based on 85 additional drawing units or additional trips 1934 02:34:43,680 --> 02:34:50,340 four or five trips per day per dwelling unit so the mitigation measures become 1935 02:34:48,720 --> 02:34:56,160 somewhat in my mind cloudy if it becomes 1936 02:34:53,880 --> 02:35:00,620 significant to all the other Parcels that become that come before the 1937 02:34:58,200 --> 02:35:08,220 commission so that what you have is basically a small impact here but how 1938 02:35:04,920 --> 02:35:13,859 many more adus will we be doing and does that put into question the X Plus y the 1939 02:35:11,520 --> 02:35:17,780 Y being the additional trips that are generated by these adus 1940 02:35:18,660 --> 02:35:28,560 um well so far we have uh 1941 02:35:24,080 --> 02:35:34,439 four planning areas that are submitted their plans I'm going to plan check and 1942 02:35:31,680 --> 02:35:39,960 none of those none of those have adus well I know you're talking and I I'll 1943 02:35:37,800 --> 02:35:46,740 concede one of these in the specific plan does talk about 80 so I think it's 1944 02:35:42,359 --> 02:35:51,240 maybe a pa5 right so it's already been included in discussion in a specific 1945 02:35:49,080 --> 02:35:57,660 plan for one area but it wasn't discussed here so I don't 1946 02:35:54,840 --> 02:36:03,960 see a significant impact of 85 additional residents generating 1947 02:36:01,260 --> 02:36:08,880 an overwhelming cause to be concerned for mitigation but I'm just wondering if 1948 02:36:06,180 --> 02:36:13,920 that Trend continues for all of the Chandler Ranch and all the old Beachwood 1949 02:36:11,520 --> 02:36:17,700 and stuff that does that call into question 1950 02:36:15,240 --> 02:36:22,680 the mitigation measures that were generated by 1951 02:36:19,760 --> 02:36:28,040 traffic studies that were dependent on the number of dwelling units that now 1952 02:36:24,720 --> 02:36:32,760 have increased by maybe 50 percent right because they'd use yeah 1953 02:36:31,620 --> 02:36:35,640 I understand um 1954 02:36:33,720 --> 02:36:39,540 I think I'll fall back on what my professor used to tell me when I ask 1955 02:36:37,260 --> 02:36:42,600 questions it depends um 1956 02:36:40,319 --> 02:36:47,460 so if the whole if the whole project came in or let's just say three quarters 1957 02:36:45,000 --> 02:36:51,240 of the project came in with adus that would be a significant amount of traffic 1958 02:36:49,439 --> 02:36:53,600 that would be generated there's no doubt about it 1959 02:36:52,439 --> 02:36:58,500 um it's it's a hard it's a really difficult 1960 02:36:56,460 --> 02:37:02,939 question to answer because a lot of the a lot of the mitigations were overridden 1961 02:37:01,080 --> 02:37:08,760 by Council right so they were class one impacts that we could not fully mitigate 1962 02:37:06,200 --> 02:37:15,479 uh they were you know I mean we did we did we required the best they could do 1963 02:37:12,720 --> 02:37:19,080 on some of the traffic impacts but they still didn't reduce whatever the impact 1964 02:37:18,060 --> 02:37:22,740 was back to what what was occurring before 1965 02:37:22,080 --> 02:37:28,620 um the project moved forward you know it's 1966 02:37:26,760 --> 02:37:35,100 one of the difficulties with the California state Adu law 1967 02:37:31,859 --> 02:37:39,540 um we have adus actually we have we permit a lot of adus around town and 1968 02:37:37,560 --> 02:37:44,220 there's no I you know I can't charge traffic impact fees unless they're above 1969 02:37:41,700 --> 02:37:48,000 a certain above a certain size and that's proportional to the size of the 1970 02:37:45,840 --> 02:37:52,260 existing structure so this is a challenge that the state of California 1971 02:37:49,319 --> 02:37:56,819 has given us right I think in this case the roads are all right size I mean 1972 02:37:54,660 --> 02:38:02,640 there is plenty of capacity within the project and on Niblick Road uh Creston 1973 02:38:00,479 --> 02:38:08,220 Road to handle it the excess traffic yeah I looked at lynnae and and saw the 1974 02:38:06,479 --> 02:38:12,840 traffic numbers and the additional traffickers and that's negligible for 1975 02:38:10,260 --> 02:38:18,600 those local roads basically well it's still I mean it's still a 1976 02:38:14,939 --> 02:38:24,000 concern from a traffic impact standpoint um you know I think as as time goes on 1977 02:38:20,939 --> 02:38:28,500 and we see how adus impact the city as a whole we may we may be able to address 1978 02:38:26,399 --> 02:38:33,359 that in our circulation element you know looking at different uh you know looking 1979 02:38:30,960 --> 02:38:38,040 at where we're going what we can expect in the future and mitigating for that as 1980 02:38:35,880 --> 02:38:43,740 we move forward that's one potential way to address that that's not part of this 1981 02:38:41,100 --> 02:38:47,640 plan tonight the uh that's part of the general plan I'm bringing up something 1982 02:38:45,660 --> 02:38:53,100 that's probably Beyond well I mean I think maybe of this just to kind of if I 1983 02:38:50,520 --> 02:38:58,080 could and tell me if I made an error but I think the with the state promulgating 1984 02:38:55,979 --> 02:39:01,920 an Adu um 1985 02:38:59,220 --> 02:39:07,859 requiring us to do adus we cannot mitigate for traffic with 1986 02:39:04,680 --> 02:39:12,359 An approved Adu I think based on what we're seeing 1987 02:39:09,420 --> 02:39:19,140 tonight the state would say that we've actually reduced 1988 02:39:14,280 --> 02:39:30,300 the density by 27 housing units so um because we cannot mitigate for adus 1989 02:39:23,280 --> 02:39:34,920 we and we've reduced from 129 to 107. um 1990 02:39:31,260 --> 02:39:39,420 we've actually reduced the mitigatable if that is a word 1991 02:39:36,960 --> 02:39:44,340 um single family residence on that site now I don't know if I got that right but 1992 02:39:42,180 --> 02:39:48,960 um it's just I think maybe a way to look at it I think that's generally correct 1993 02:39:46,140 --> 02:39:53,640 and basically you've got to kind of understand that for the last 60 years 1994 02:39:50,640 --> 02:39:57,540 with planning law a unit was a unit and typically those units had to cover 1995 02:39:55,200 --> 02:40:02,460 whatever their impacts were and the state basically decided that that wasn't 1996 02:39:59,640 --> 02:40:07,740 working any longer and that there had been a housing crisis of such severity 1997 02:40:04,859 --> 02:40:14,100 created by implementation of those sort of rules they basically just preempted 1998 02:40:10,979 --> 02:40:18,359 those rules which the state had created originally as well and basically said 1999 02:40:16,140 --> 02:40:23,100 we're not going to count adus and that you can build two adus on every single 2000 02:40:20,760 --> 02:40:27,420 family lot in the state so it's not just this project that could increase units 2001 02:40:25,500 --> 02:40:32,040 literally there's tens ten thousand adus that can be built 2002 02:40:30,300 --> 02:40:36,000 within this town without any mitigation measures it's probably permitted on 2003 02:40:33,600 --> 02:40:39,660 existing Lots now yeah exactly so I think so really what you have to think 2004 02:40:38,040 --> 02:40:44,220 about is there is a potential that those units 2005 02:40:41,939 --> 02:40:48,540 create new impacts to traffic Water and Sewer that aren't covered by our 2006 02:40:45,780 --> 02:40:53,160 standard fees and mitigations and basically what the state said is instead 2007 02:40:51,479 --> 02:40:57,420 of the developer having to cover those costs which has been the how we've done 2008 02:40:55,319 --> 02:41:01,439 planning for the last couple decades it's the general Public's going to have 2009 02:40:59,580 --> 02:41:05,580 to cover that cost so if we have a traffic problem at an intersection we're 2010 02:41:03,840 --> 02:41:10,460 not going to lean on the developer to fix it the community is going to have to 2011 02:41:07,740 --> 02:41:16,800 cover that cost I just didn't know if it put into question of the uh 2012 02:41:14,580 --> 02:41:19,859 environmental mitigations that were a part of a specific plan but based on 2013 02:41:18,540 --> 02:41:25,080 what you're telling me the state law says it doesn't yeah the state says 2014 02:41:22,020 --> 02:41:30,359 doesn't adus don't count towards sequa okay they just made that rule up and 2015 02:41:27,420 --> 02:41:35,040 that's the rule now yeah thank you my other question I think you already the 2016 02:41:32,479 --> 02:41:39,540 gentleman already answered that these are not going to be owned by individuals 2017 02:41:36,720 --> 02:41:45,479 they'll be owned by a management or they'll be managed by a manager and so 2018 02:41:42,840 --> 02:41:51,000 the Adu and their primary unit won't have one owner it'll be all the Clusters 2019 02:41:48,060 --> 02:41:56,720 will be under one ownership and they'll rent out or right or lease out each unit 2020 02:41:54,180 --> 02:42:01,500 individually the primary unit and the Adu yes that's the premise Adam if you 2021 02:42:00,240 --> 02:42:06,300 want to add anything to that but that is the premise yeah 2022 02:42:04,260 --> 02:42:11,120 yeah he's spot on no he's absolutely correct okay 2023 02:42:07,800 --> 02:42:17,280 and the uh Adu would have the open parking space the primary residence 2024 02:42:14,160 --> 02:42:20,880 would have the covered space uh two in a garage yeah 2025 02:42:18,960 --> 02:42:26,040 okay that's all the questions I have thank you commissioner 2026 02:42:23,580 --> 02:42:30,720 uh I guess my question is uh with the setbacks and you might have explained it 2027 02:42:27,960 --> 02:42:36,540 but is there an impact to certain like backyards or side yards with the setback 2028 02:42:33,359 --> 02:42:42,240 changes or or those in locations that aren't going to impact like the the end 2029 02:42:38,819 --> 02:42:46,319 user's property essentially so the the 2030 02:42:44,399 --> 02:42:52,380 um variances that we're asking for on the yards do impact the outdoor living 2031 02:42:48,840 --> 02:42:56,460 space of these homes and then that are just they're not specifically called out 2032 02:42:54,540 --> 02:43:02,280 an amount per house in the specific plan but they are generally regarded as this 2033 02:42:59,700 --> 02:43:08,040 yard will belong to this house um and so it does impact that a little 2034 02:43:04,439 --> 02:43:13,439 bit and we've split those spaces up into being some for adus and some for primary 2035 02:43:11,280 --> 02:43:18,540 residences but yes that Dimension from house to fence is is has been reduced 2036 02:43:16,800 --> 02:43:21,840 from 10 to sometimes as little as eight six 2037 02:43:20,220 --> 02:43:25,979 um so it impacts the space a little bit but the the we really wanted to 2038 02:43:23,700 --> 02:43:29,760 illustrate we're used to working in cozy spaces we do a lot of smaller scale 2039 02:43:27,960 --> 02:43:36,359 things and just wanted to show that it is entirely possible to furnish enjoy 2040 02:43:32,460 --> 02:43:40,800 and um uh and live in those spaces even if they're a little more trim than they 2041 02:43:38,580 --> 02:43:46,800 were originally proposed to me sure sure and then uh you mentioned it but I 2042 02:43:43,920 --> 02:43:51,479 wanted how many households and total households will this have and total 2043 02:43:49,680 --> 02:43:56,819 number of parking spots including street parking what was the number there sure 2044 02:43:53,340 --> 02:44:02,340 so it's um and I don't have the added number in my head but it's a total of 2045 02:43:59,160 --> 02:44:06,060 214 dwelling dwelling units half adus half primary residences each primary 2046 02:44:04,200 --> 02:44:10,500 residence has two covered parking spaces in a garage each accessory dwelling unit 2047 02:44:08,280 --> 02:44:15,420 has one surface space and then there's 121 2048 02:44:12,780 --> 02:44:19,740 um first come first serve guest spaces throughout the community so it's a very 2049 02:44:17,700 --> 02:44:23,520 high total for a residential neighborhood but it is possible guests 2050 02:44:21,479 --> 02:44:27,359 would have to travel from a get like an off street parking fairly far to visit a 2051 02:44:25,920 --> 02:44:31,500 friend or whatever that would be like they would it's a hypothetical 2052 02:44:28,979 --> 02:44:37,620 possibility okay um that's all the questions I have 2053 02:44:34,800 --> 02:44:42,720 commissioner cover rubies thank you sir 2054 02:44:39,359 --> 02:44:46,979 so I was on DRC and the first thing I will say is I'm really happy about the 2055 02:44:44,340 --> 02:44:50,819 fencing change yes in fact I think I was the one that brought it up 2056 02:44:48,660 --> 02:44:55,680 um some kudos to that um Darren could you explain to me just 2057 02:44:52,800 --> 02:44:59,280 real quick the open space policy I understand that open space has to be 2058 02:44:57,720 --> 02:45:04,380 provided for anything over 800 square feet correct so the 80. we're talking 2059 02:45:01,920 --> 02:45:10,500 about the 80 80 uses right so if I'm understanding the idea is that the open 2060 02:45:08,280 --> 02:45:15,080 space they're asking for the open space the contributor to that be the clubhouse 2061 02:45:12,840 --> 02:45:21,840 be the pool area be all these other amenities so to speak right so the open 2062 02:45:18,840 --> 02:45:28,319 space theory is not open space directly adjacent or near the Adu is that correct 2063 02:45:25,859 --> 02:45:34,140 well the private open space I think the intent is that it it be near and be 2064 02:45:30,780 --> 02:45:38,060 there specifically for that unit like we're all used to having right whether 2065 02:45:36,120 --> 02:45:44,880 it's a patio or a balcony or something so again we go back to the the Adu laws 2066 02:45:42,420 --> 02:45:53,180 and what it indicates is that if you have an Adu 800 or less square feet 2067 02:45:50,280 --> 02:45:58,439 the city can't require a yard area if it's going to preclude 2068 02:45:56,700 --> 02:46:04,500 someone from the being able to build that unit they're taking away 2069 02:46:01,640 --> 02:46:11,700 development standards so that makes it easier for people to build accessory 2070 02:46:06,780 --> 02:46:16,620 dwelling units so uh that being said so if it's less than 800 square feet then 2071 02:46:17,300 --> 02:46:27,359 open space private open space for those units does not have to be provided for 2072 02:46:23,220 --> 02:46:34,859 so if it's over 800 which there are 21 that are about 850 then those units is 2073 02:46:33,120 --> 02:46:39,420 that's what really would come down to this discussion with the Planning 2074 02:46:36,540 --> 02:46:45,060 Commission is for the 21 units because technically for the 86 for that are less 2075 02:46:42,840 --> 02:46:49,680 than than 800 what they're showing is possible in 2076 02:46:47,819 --> 02:46:55,319 state the state law and even the city's Adu law would say for those lot units 2077 02:46:52,620 --> 02:46:59,580 less than 800 we wouldn't have to require the private open space they're 2078 02:46:58,080 --> 02:47:05,880 designing a community where there's other places to go for common open space 2079 02:47:02,580 --> 02:47:13,439 but not private for those units the 847 the the 21 that are over the 2080 02:47:09,540 --> 02:47:17,220 800. I think that's the question is on those where 2081 02:47:14,640 --> 02:47:23,760 then we get into the city's ordinance saying you need to provide uh 200 square 2082 02:47:20,580 --> 02:47:26,760 feet of private open space Darren if I might is is 2083 02:47:25,140 --> 02:47:32,399 um I went back and double checked the data on this and in fact the large Adu 2084 02:47:29,880 --> 02:47:36,120 is with the large primary and it's that one that stretches along the back and it 2085 02:47:34,680 --> 02:47:40,800 actually has um it exceeds the amount of required 2086 02:47:38,220 --> 02:47:46,020 open space adjacent to it that the city's implementation ordinance requires 2087 02:47:42,960 --> 02:47:52,080 so you're seeing it it provides over 200 square feet it does yes 295 and that's 2088 02:47:48,420 --> 02:47:58,800 on the large yes what about the others um the uh the others vary they have 2089 02:47:55,620 --> 02:48:03,479 um the plant twos plant twos are uh a lot thank you very 2090 02:48:02,100 --> 02:48:06,540 much for that diagram um 2091 02:48:04,200 --> 02:48:11,280 so can you go back one more or I can go back one more maybe 2092 02:48:08,700 --> 02:48:14,399 uh yes okay so nope sorry I have to go forward to the 2093 02:48:13,260 --> 02:48:19,260 other one that doesn't have all the art data on it 2094 02:48:16,500 --> 02:48:23,340 um the one right in the middle um sorry image nine 2095 02:48:21,540 --> 02:48:30,060 sorry for being goofy okay so 2096 02:48:25,200 --> 02:48:33,899 um for example this uh Adu has space that would have been the primary 2097 02:48:31,920 --> 02:48:38,220 residences backyard so that's how that works on that one 2098 02:48:35,640 --> 02:48:43,620 which is why his number is very high um this Adu in primary have all of that 2099 02:48:41,220 --> 02:48:48,540 yard stretched out along there and there's it's fenced in the middle 2100 02:48:45,960 --> 02:48:53,640 um so the this Adu has 295 square feet and the primary has a large chunk there 2101 02:48:50,640 --> 02:48:58,080 as well so that's how that works the um these two guys here are are smaller they 2102 02:48:57,000 --> 02:49:04,920 have very little they have a little captured space there in which is um 2103 02:49:01,220 --> 02:49:09,240 that's like 150 square feet so my question would be then on the on 2104 02:49:07,439 --> 02:49:13,859 the unit that's there next to the large unit that has the Adu near the it looks 2105 02:49:12,600 --> 02:49:19,080 like a fence line there or something that has the backyard where's the open 2106 02:49:16,500 --> 02:49:23,880 space for the primary unit It's Kind It's a combination of at grade 2107 02:49:21,180 --> 02:49:27,720 and then and above grade balconies so the primary unit has a balcony there yes 2108 02:49:26,220 --> 02:49:33,780 all the primary units have balconies they do yeah 2109 02:49:29,819 --> 02:49:39,420 so in this in today's presentation you're asking for the commission to make 2110 02:49:35,880 --> 02:49:47,160 an exception or to Grant an exception on the units the Adu Adu units they do not 2111 02:49:42,359 --> 02:49:51,660 have 200 square feet of open space private open space you're asking us to 2112 02:49:49,439 --> 02:49:56,280 allow the clubhouse I just want to make sure I'm clear on what we're being asked 2113 02:49:53,100 --> 02:50:03,720 to do on the open space Theory right so what it ends up being is that 2114 02:50:00,479 --> 02:50:09,899 the units less than 800. don't have to provide it right the units 2115 02:50:06,780 --> 02:50:15,960 over he's indicating he's providing it so he complies he's providing the 200 or 2116 02:50:12,840 --> 02:50:22,380 more square feet on a portion of the adus correct not all of them or is that 2117 02:50:18,859 --> 02:50:30,540 on all of the adus that are over over 800. so over 800 adus square feet they 2118 02:50:28,020 --> 02:50:35,700 have 200 square feet of private open space yes okay 2119 02:50:33,960 --> 02:50:40,319 okay if you if you read the project description that was provided 2120 02:50:38,040 --> 02:50:44,240 it indicates that they're asking for what they indicated was a variant so 2121 02:50:42,120 --> 02:50:51,540 that we're asking for a modification for open space related to adus 2122 02:50:49,200 --> 02:50:55,380 I wanted to give a little more specifics that 2123 02:50:53,220 --> 02:51:00,540 for the all the for most of them that are over the less than 800. 2124 02:50:58,260 --> 02:51:07,500 the ordinances don't require the open space because of the size 2125 02:51:03,780 --> 02:51:14,939 come to find out Daniel did looked at or David I'm sorry looked at his uh plans 2126 02:51:11,760 --> 02:51:21,660 and indicated that they do or they are providing private open space for the 2127 02:51:17,819 --> 02:51:26,280 adus that are over 800 in these plants Okay so 2128 02:51:23,880 --> 02:51:29,640 we're not necessarily needing anything specific from the Planning Commission on 2129 02:51:28,020 --> 02:51:34,560 open space we were able to kind of through this process determine how each 2130 02:51:32,460 --> 02:51:39,120 of it was done however just like the question of 2131 02:51:36,660 --> 02:51:45,840 traffic or parking or how what are these impacts of all these units we still want 2132 02:51:41,760 --> 02:51:50,939 these folks to have a a place to to go have you know take their dog do 2133 02:51:47,939 --> 02:51:57,779 different things that's the discussion of the added amenities because the 2134 02:51:53,939 --> 02:52:02,279 specific plan designed for PA 13 didn't have a clubhouse didn't have a fitness 2135 02:51:59,640 --> 02:52:05,700 didn't have the dog park all those amenities that are being provided here 2136 02:52:04,020 --> 02:52:09,540 so if there was a request for the Planning 2137 02:52:07,680 --> 02:52:16,800 Commission to not allow or not require the open space 2138 02:52:12,439 --> 02:52:21,960 the the the the exchange would be these added amenities that weren't originally 2139 02:52:18,479 --> 02:52:28,740 required for the plan was the discussion but technically they're showing that 2140 02:52:24,479 --> 02:52:33,359 they are providing the the Open Space by the size of the adus as well as the 2141 02:52:31,740 --> 02:52:36,140 larger ones actually physically providing that 2142 02:52:37,080 --> 02:52:44,399 okay I appreciate that I think we're on the same page I hope so and I would just 2143 02:52:42,180 --> 02:52:49,020 to be clear I was only referencing the ones that were over 800 because I again 2144 02:52:47,340 --> 02:52:52,740 just want to make sure we're clear and again just for clarity Emergency 2145 02:52:50,220 --> 02:52:56,340 Services has reviewed everything they're good with the turn radius radiuses and 2146 02:52:55,080 --> 02:53:00,840 all of that good stuff within the Clusters correct and they're actually we 2147 02:52:58,920 --> 02:53:06,240 have engineered plans because they're concurrently we're working on Final maps 2148 02:53:03,600 --> 02:53:10,080 we're working on uh Improvement plans and those have all been reviewed by 2149 02:53:07,920 --> 02:53:16,200 Emergency Services awesome um and then last comment during DRC 2150 02:53:13,500 --> 02:53:19,500 um I had made a comment about solar and it was something that you guys were 2151 02:53:17,520 --> 02:53:25,020 going to maybe investigate a little bit or look into yes sir no no changes to 2152 02:53:22,500 --> 02:53:29,700 that the um oh you know I did before I speak I got I 2153 02:53:27,300 --> 02:53:34,200 I got confused um no I can yeah I can speak to that we 2154 02:53:32,760 --> 02:53:37,920 we are adding solar out of the problem okay that's what I thought and I we're 2155 02:53:36,060 --> 02:53:42,080 working at two at the same time I know that I I couldn't I got them briefly 2156 02:53:39,660 --> 02:53:47,819 confused for them communicated again will be a huge part 2157 02:53:45,180 --> 02:53:53,460 of the problem yes okay so that is being added yes okay all right awesome all 2158 02:53:51,359 --> 02:53:58,620 right no more questions commissioner Copeland yes thank you just a few things 2159 02:53:56,520 --> 02:54:02,040 um What's the timing between the construction of these units and the 2160 02:53:59,939 --> 02:54:06,899 Improvement of linear Road Adam do you know that one 2161 02:54:04,380 --> 02:54:12,779 that that's a tough one because Danny brose is the one who's doing the 2162 02:54:08,640 --> 02:54:16,319 Improvement to to the uh public roads um so I I really don't know the answer 2163 02:54:14,700 --> 02:54:19,740 to that question um 2164 02:54:17,760 --> 02:54:23,100 that's a really actually great question that I would love to know the answer to 2165 02:54:21,000 --> 02:54:27,960 as well let me let me phrase it a different way 2166 02:54:25,140 --> 02:54:31,500 to staff would we issue full permits including accuracy permits without that 2167 02:54:29,640 --> 02:54:35,180 road Improvement occurring Mark can you speak a little more into 2168 02:54:34,080 --> 02:54:39,359 your mind oh sorry oh please did you catch the 2169 02:54:37,800 --> 02:54:44,640 question but I think we understand your question okay 2170 02:54:40,620 --> 02:54:47,939 uh David city engineer just to read just to um make sure I'm clear on the 2171 02:54:46,740 --> 02:54:52,920 question it was about are we going to issue site 2172 02:54:50,220 --> 02:54:56,700 Improvement permits without Road permits being 2173 02:54:53,939 --> 02:54:59,640 issued Mary just so I can just unclear let me rephrase a little bit we've 2174 02:54:58,380 --> 02:55:03,720 looked at some really attractive sections for Linnea showing all the 2175 02:55:01,979 --> 02:55:07,439 public uses within the right-of-way the distance from the curb line to the fence 2176 02:55:05,340 --> 02:55:10,920 to these units does that happen as a package are we going to get houses are 2177 02:55:08,880 --> 02:55:17,520 going to be built with existing Linnea for some period of time 2178 02:55:13,560 --> 02:55:20,700 so the developer uh Olson 212 Danny brose 2179 02:55:18,439 --> 02:55:26,640 has released plans for both Sherwood so continuing on 2180 02:55:25,319 --> 02:55:30,120 Sherwood down um 2181 02:55:27,240 --> 02:55:34,680 down to PA 15 maybe so we can show that yeah there we go that'd be great 2182 02:55:32,700 --> 02:55:38,640 um so this is actually the code right here it's currently designed to about 2183 02:55:36,240 --> 02:55:42,840 this point here they're coming in with the rest of this design uh actually 2184 02:55:40,859 --> 02:55:47,520 comes around the corner and comes down to Hanson at the same time Park View 2185 02:55:45,899 --> 02:55:55,260 Lane will need to be completed here before any of these 2186 02:55:50,580 --> 02:55:59,220 are occupied same with Sherwood Road and Airport Road and they've currently bid 2187 02:55:57,420 --> 02:56:03,960 these out and they're moving towards construction and they've provided 2188 02:56:04,020 --> 02:56:10,500 uh they've got a contractor to do the work so it's it all has to happen 2189 02:56:08,880 --> 02:56:16,200 together because they have because they have to build the roads to get the water 2190 02:56:12,240 --> 02:56:19,979 to pa-13 and to get the sewer so it all has to happen at the same time and 2191 02:56:18,240 --> 02:56:23,100 they're moving forward with that okay great that's the key to the answer I 2192 02:56:21,540 --> 02:56:26,760 guess thank you um 2193 02:56:24,420 --> 02:56:32,520 Rental Community managed by an another entity will they require the use of 2194 02:56:29,399 --> 02:56:37,319 garages for vehicles um Adam you could back me up on that one 2195 02:56:33,899 --> 02:56:42,600 but the way yeah one yes is the short answer to that yes absolutely can I just 2196 02:56:39,660 --> 02:56:49,439 want to mention one thing in a um in a managed Community uh the um it's an 2197 02:56:46,859 --> 02:56:55,140 interest of the owners who are attracting residents to the community to 2198 02:56:52,319 --> 02:56:58,380 have quite strict standards about what people can do the question came up in 2199 02:56:56,880 --> 02:57:02,460 DRC can somebody park in front of their garage door and that's one of the most 2200 02:57:00,060 --> 02:57:06,840 strictly enforced things your lease agreement for a renter and or your HOA 2201 02:57:04,500 --> 02:57:10,620 agreement for someone else addresses those types of things to maintain a high 2202 02:57:08,460 --> 02:57:15,140 level of I'm going to call it livability even though that's kind of cliched 2203 02:57:13,080 --> 02:57:15,140 good 2204 02:57:15,740 --> 02:57:22,439 okay thank you because I guess the concern I had was and I'll show I'm not 2205 02:57:21,120 --> 02:57:25,920 a native to this state but my observation is that disproportionately 2206 02:57:24,420 --> 02:57:29,279 people use their garages here for storage rather than for vehicles and 2207 02:57:28,080 --> 02:57:33,720 should that occur in this kind of environment I can see the hundred and 2208 02:57:31,319 --> 02:57:38,340 whatever street spaces being gone immediately and I can also see Adu 2209 02:57:36,840 --> 02:57:41,460 people that will have two vehicles who will need one of those Street spaces so 2210 02:57:39,840 --> 02:57:45,600 I'm just wondering how all the parking truly fits in the real world and I think 2211 02:57:43,859 --> 02:57:49,740 the fact that it's managed and owned by an entity gives you a club that you 2212 02:57:47,700 --> 02:57:53,420 don't typically have and you can require that to occur so I think that's 2213 02:57:50,880 --> 02:57:53,420 encouraging 2214 02:57:53,760 --> 02:58:00,020 um help me understand a little bit so the previous plan that was part of the 2215 02:57:58,620 --> 02:58:05,460 specific plan for this neighborhood showed a couple of larger neighborhood 2216 02:58:03,060 --> 02:58:08,939 park areas they were diagrammed in green they were labeled as neighborhood parks 2217 02:58:07,200 --> 02:58:12,660 but from what I could find in going back to the specific plan they really weren't 2218 02:58:10,680 --> 02:58:16,200 yeah it's those areas it really wasn't articulators to what those were right 2219 02:58:14,399 --> 02:58:19,500 when you looked at the Turtle Creek plan and when you looked at the Overlook 2220 02:58:17,580 --> 02:58:23,279 there were very specific diagrammatic things about what was going into those 2221 02:58:20,819 --> 02:58:27,000 Parks as well as listings of things so I could understand how that occurred when 2222 02:58:25,260 --> 02:58:31,140 I look at the bedroom compositions here plan two is three bedrooms Plan Three is 2223 02:58:29,279 --> 02:58:34,800 three bedrooms those are family units to me they're going to be at a reasonably 2224 02:58:33,000 --> 02:58:39,180 affordable price point presumably for the motor Court units obviously the Adu 2225 02:58:37,380 --> 02:58:44,640 is adding yet another threshold of affordability and all of that's great 2226 02:58:41,580 --> 02:58:49,080 but I see kids in these places and I'm not sure how the resort style meets the 2227 02:58:47,040 --> 02:58:53,520 needs of all of the kids pools great where's the open space do they go to 2228 02:58:51,300 --> 02:58:58,979 Turtle Creek Park they cross a fairly major significant road to get there 2229 02:58:56,000 --> 02:59:04,380 help me understand you've put in these pocket Parts which are but Linnea how 2230 02:59:02,279 --> 02:59:08,880 has that worked for families who want to recreate it we talked about Open Spaces 2231 02:59:06,479 --> 02:59:13,380 really the private Open Spaces not immediately contiguous to some of these 2232 02:59:10,740 --> 02:59:16,680 units yes fenced backyards and so forth but where is there some room to roam 2233 02:59:15,120 --> 02:59:23,760 around here does it have to go to Turtle Creek or how is that accommodated 2234 02:59:20,279 --> 02:59:28,680 can I jump in and yesterday um so so what we need to remember also 2235 02:59:26,220 --> 02:59:33,899 is we are a very small glimpse of a master plan Community PA 13 is one 2236 02:59:31,080 --> 02:59:37,500 Community we have out of 26 where you've got you know five miles of walking 2237 02:59:35,520 --> 02:59:42,479 trails you've got pickleball courts you've got basketball courts you have 2238 02:59:39,120 --> 02:59:47,819 wide open space and vast majority of the entire master plan community so if if 2239 02:59:45,779 --> 02:59:54,300 someone like a family is really looking for you know uh just grass to run around 2240 02:59:51,600 --> 03:00:00,000 in the pocket parks at our first on our PA 13 is not enough uh you can easily 2241 02:59:57,720 --> 03:00:06,359 cross the street and now you've got Acres upon Acres of open Lush Fields 2242 03:00:03,899 --> 03:00:10,260 um you've got beautiful wineries uh of grapes that are going to be grown by 2243 03:00:07,740 --> 03:00:13,859 Danny Rose and the association um and you've you've got that right 2244 03:00:11,939 --> 03:00:16,220 right there within the whole master plan community 2245 03:00:16,439 --> 03:00:23,279 okay thank you I expected that would be the response because there is a lot of 2246 03:00:20,819 --> 03:00:27,300 open space with Turtle Creek a question on the Overlook which lies fairly close 2247 03:00:25,500 --> 03:00:31,200 to this as well it's listed as member parking on the site plan so I assume 2248 03:00:29,399 --> 03:00:35,760 there's a membership component to that that is a paid component to that as part 2249 03:00:33,479 --> 03:00:39,600 of the specific plan are these people who rent these units members that can 2250 03:00:37,800 --> 03:00:43,260 use the Overlook facilities also for recreation 2251 03:00:41,040 --> 03:00:45,840 that is correct okay without additional fear it's built into their lease 2252 03:00:44,700 --> 03:00:49,380 agreements it's built into their lease agreements 2253 03:00:47,640 --> 03:00:52,500 okay that's great that's another measure of open space that's helpful great thank 2254 03:00:51,060 --> 03:00:54,620 you I think that's all my questions for now 2255 03:00:55,560 --> 03:01:02,540 um I do have a question we have commented on the ability of these to be 2256 03:01:01,560 --> 03:01:08,100 sold the potential 2257 03:01:04,800 --> 03:01:14,640 um and if that is with those adus be deep restricted to be 2258 03:01:10,500 --> 03:01:20,399 remain rental as part of the um you know that building unit 2259 03:01:18,060 --> 03:01:27,240 um or would they end up being sold separately and then the Adu is gone 2260 03:01:24,300 --> 03:01:33,540 so so per state law we are not allowed to subdivide the Adu from the primary 2261 03:01:30,240 --> 03:01:36,359 residence so if if they ever were to be sold which 2262 03:01:35,040 --> 03:01:40,200 um we've even talked about putting a deed restriction where the entire 2263 03:01:38,279 --> 03:01:44,819 Community would have to be sold as one Community uh to ease to ease the 2264 03:01:42,660 --> 03:01:50,220 council's kind of concern on that matter um but but if if for whatever reason 2265 03:01:47,880 --> 03:01:54,720 that doesn't happen and let's say you know 20 years from now a developer buys 2266 03:01:52,560 --> 03:01:59,040 a community and wants to sell individual Lots they only want to sell half the 2267 03:01:56,160 --> 03:02:02,160 community they would have to sell it as per the subdivision map that's being 2268 03:02:00,779 --> 03:02:05,100 approved great thank you 2269 03:02:04,200 --> 03:02:09,960 um so 2270 03:02:06,420 --> 03:02:17,819 we essentially have taken away 22 units to those 22 units then go back into the 2271 03:02:14,100 --> 03:02:23,100 pool of units available to the channel or specific plan or do they go back that 2272 03:02:20,700 --> 03:02:27,600 is actually correct yeah no that's and we're talking with shea right now who is 2273 03:02:25,200 --> 03:02:30,439 essentially wanting those units to add to their pas 2274 03:02:31,560 --> 03:02:36,899 um and now for staff I'm going to geek out a little bit 2275 03:02:35,220 --> 03:02:44,399 um this 107 adus 2276 03:02:40,880 --> 03:02:49,319 will add to our Arena allocation correct 2277 03:02:46,319 --> 03:02:54,899 um do we know where they will fall will they fall in the low or even moderate 2278 03:02:53,040 --> 03:03:00,660 um on the arena scale 2279 03:02:56,580 --> 03:03:04,200 I think it's adus by Design or the lower income is that correct I think in the 2280 03:03:02,760 --> 03:03:08,580 housing element there's certain assumptions where certain percentages 2281 03:03:06,300 --> 03:03:13,260 are allocated to moderate and certain to low so we will just that's the 2282 03:03:11,160 --> 03:03:17,100 assumption is as they're built or they'll just fall into those categories 2283 03:03:15,000 --> 03:03:21,300 by default based on the market studies that were done during the um housing 2284 03:03:19,200 --> 03:03:26,040 element preparation I would probably guess they end up in the moderate 2285 03:03:24,359 --> 03:03:31,140 well I think we're just going to use what the market rate assumptions were 2286 03:03:28,800 --> 03:03:35,160 when the housing element was done so if we produce 100 we'll look at that market 2287 03:03:33,300 --> 03:03:41,760 study that was done and go okay this percent qualifies for low this is uh 2288 03:03:38,939 --> 03:03:47,359 moderate and that's what we'll file we aren't going to go back and try to see 2289 03:03:43,920 --> 03:03:47,359 what things are actually renting for 2290 03:03:47,460 --> 03:03:59,880 okay so even though it may not be low um we would assign it low yes so the 2291 03:03:56,880 --> 03:04:05,279 housing element when it was certified made certain assumptions that Adu 2292 03:04:02,819 --> 03:04:08,399 production was going to be spread among these categories so we'll just follow 2293 03:04:07,020 --> 03:04:12,240 that through the whole housing element cycle thank you 2294 03:04:10,680 --> 03:04:15,600 um and that's all the geeking out I'm going to do to this evening 2295 03:04:14,279 --> 03:04:21,300 um so um open it up to public comment and 2296 03:04:18,300 --> 03:04:24,979 since we're ultimately almost lonely in the chamber um 2297 03:04:26,479 --> 03:04:32,399 hearing none I will close public comment and bring it back to the commission for 2298 03:04:31,140 --> 03:04:37,439 comments um commissioner Marla any comments 2299 03:04:35,220 --> 03:04:41,580 no comments no commissioner Conley any further comments well I just thought of 2300 03:04:39,359 --> 03:04:45,720 something kind of minor but we're all kind of going to electric cars I was 2301 03:04:43,859 --> 03:04:53,460 wondering if they'll be 240 in the garage that's maybe too detailed to ask 2302 03:04:49,620 --> 03:04:57,540 that with solar power maybe 240 level 2 Charging for electric cars 2303 03:04:55,560 --> 03:05:02,840 I suspect that would be a great amenity for the folks running the place and that 2304 03:04:59,520 --> 03:05:02,840 may be a thought yeah yeah 2305 03:05:04,260 --> 03:05:10,740 commissioner Christmas thank you 2306 03:05:09,479 --> 03:05:16,140 um some of my comments are 2307 03:05:13,140 --> 03:05:22,260 I like the design it's a nice design I'm I am disappointed in 2308 03:05:19,380 --> 03:05:25,020 um the compactness of it I feel like it's gone away from a little bit of the 2309 03:05:23,939 --> 03:05:30,240 spirit of the specific plan unfortunately when the specific plan was 2310 03:05:27,420 --> 03:05:34,560 approved the new Adu laws weren't in place uh in the in the form that they 2311 03:05:33,240 --> 03:05:39,720 are today uh which is honestly taken a lot away 2312 03:05:37,319 --> 03:05:46,140 from the city and the way they I feel have the ability to manage certain 2313 03:05:41,220 --> 03:05:51,899 things so for me that's that's a um a disappointment uh I am glad to hear that 2314 03:05:48,600 --> 03:05:57,600 the larger adus do get their 200 square feet of private uh private open space I 2315 03:05:55,500 --> 03:06:03,960 don't believe that common open space particularly in this development 2316 03:06:00,000 --> 03:06:06,779 um is actually very accommodating as one of the other Commissioners pointed out 2317 03:06:05,100 --> 03:06:11,880 there's really not a lot of park space and you're asking families to really uh 2318 03:06:09,540 --> 03:06:17,340 Transit out of the community whether it's walking biking or what have you to 2319 03:06:14,520 --> 03:06:23,760 another location which that that Community was designed for that which I 2320 03:06:20,399 --> 03:06:28,680 uh I believe was a good concept I'm having a really hard time with this 2321 03:06:25,380 --> 03:06:35,160 density for several reasons um the variance allows that to happen is 2322 03:06:32,760 --> 03:06:38,880 what it seems like to me um and as a planning commissioner we 2323 03:06:37,439 --> 03:06:41,819 don't get many um 2324 03:06:39,720 --> 03:06:47,100 many things to say about a track like this as they circumvent and add a 2325 03:06:45,240 --> 03:06:51,479 tremendous amount of units which I wouldn't say that the city doesn't need 2326 03:06:48,600 --> 03:06:54,600 the units we do need the units and I was really hoping that this project would be 2327 03:06:53,340 --> 03:06:59,100 again um affordable housing for people to buy 2328 03:06:56,660 --> 03:07:03,899 uh I think that that was something I was really hoping for with the specific plan 2329 03:07:01,319 --> 03:07:07,560 as well as I was many people commented with me publicly about that and they 2330 03:07:05,760 --> 03:07:11,160 were excited that we would have that opportunity which it doesn't seem like 2331 03:07:09,720 --> 03:07:13,680 in some of these cases that's going to happen 2332 03:07:12,840 --> 03:07:18,560 um I'm not in favor of allowing for their 2333 03:07:15,720 --> 03:07:23,700 variances I think that it alludes to us 2334 03:07:21,420 --> 03:07:28,979 being in favor of the impact that this will will give the city and personally I 2335 03:07:26,520 --> 03:07:33,420 think I get it it's a smart work around in a lot of ways 2336 03:07:30,600 --> 03:07:39,300 um and I'm not opposed to adus I'm a big fan of adus but in this case I feel like 2337 03:07:36,359 --> 03:07:43,800 we've just gone too far but it's not because the adus I think it's because 2338 03:07:41,100 --> 03:07:46,680 the compactness the tightness of this development 2339 03:07:45,779 --> 03:07:50,520 um the other aspect is the concerning thing 2340 03:07:48,840 --> 03:07:55,500 with the overall introduction of so many uh homes and 2341 03:07:53,819 --> 03:08:00,960 again this is something that the state has taken away from the city uh but you 2342 03:07:58,080 --> 03:08:07,740 know planning fees uh the impact on on our infrastructure our water sewer uh 2343 03:08:04,859 --> 03:08:12,420 the streets and and I understand that um uh you know David's point that that you 2344 03:08:10,439 --> 03:08:17,220 know we can handle it but can we handle the next you know 100 200 300 adus 2345 03:08:15,479 --> 03:08:22,680 potentially um don't know and and maybe that's 2346 03:08:19,260 --> 03:08:30,180 something that I will live to see but um in my in my view I'm not in favor of the 2347 03:08:26,399 --> 03:08:34,020 of the variances for the setbacks and um I do like the design style I think 2348 03:08:32,040 --> 03:08:38,100 it's a very nice design style I like that they went with just the modern 2349 03:08:35,100 --> 03:08:42,359 Farmhouse I like that they're using some different elevations to do that some of 2350 03:08:40,260 --> 03:08:47,399 the other design features like front decks as open space I don't know I've 2351 03:08:45,960 --> 03:08:52,680 seen a lot of houses nobody ever really uses that five feet of space but um I 2352 03:08:50,939 --> 03:08:55,979 could be wrong in that as well too so those are my comments at this point in 2353 03:08:54,180 --> 03:09:01,939 time and I'm welcome to uh to hear anybody as Elsa's comments 2354 03:08:58,500 --> 03:09:01,939 commissioner kobler 2355 03:09:02,580 --> 03:09:09,779 um I was on DRC when I saw this as well and and actually the staff report talked 2356 03:09:07,800 --> 03:09:12,779 about how DRC was generally in favor and I think that's an accurate statement but 2357 03:09:11,399 --> 03:09:15,540 we also sent it to the full Planning Commission because there's a lot of 2358 03:09:13,859 --> 03:09:20,580 details associated with this thing that needed to be discussed by six or seven 2359 03:09:17,760 --> 03:09:24,540 of us instead of just three of us part of that was born from some of the 2360 03:09:22,439 --> 03:09:27,600 frustration I have and it's not geared towards this project or this applicant 2361 03:09:25,859 --> 03:09:31,020 at all but it's with the mandates by the states that we're forced into certain 2362 03:09:29,220 --> 03:09:36,060 things I won't pontificate on that it's already been covered but it leads me to 2363 03:09:34,080 --> 03:09:41,760 have concerns about from a density perspective not not counting the adus as 2364 03:09:38,819 --> 03:09:45,420 a density in numeric form but simply the physical context of putting these units 2365 03:09:43,620 --> 03:09:49,020 together the Open Spaces the driveways the parking spaces the entries the 2366 03:09:47,520 --> 03:09:53,520 distance and walking dentures and so forth this is a very very compressed 2367 03:09:51,720 --> 03:09:56,700 compact development more so than we've seen 2368 03:09:54,720 --> 03:10:00,600 um I I think it's analogous some of the things you see in slow but I don't think 2369 03:09:58,200 --> 03:10:05,760 Paso has seen a development that will be this quite and I'll use the word intense 2370 03:10:02,340 --> 03:10:09,899 instead of dense purposely and so I I get down to the point of looking at the 2371 03:10:07,680 --> 03:10:14,700 the variances are being requested and I think in one half I say to myself we can 2372 03:10:12,840 --> 03:10:19,260 actually hold this project to standards which may mean a change in the atus 2373 03:10:17,520 --> 03:10:22,800 then I look at the numbers and the numbers the variance that we're talking 2374 03:10:20,880 --> 03:10:26,939 about you know it's a foot here or there it's it's a foot and a half 2375 03:10:24,600 --> 03:10:30,540 in this spot and it's 22 inches in this spot and I'm just paraphrasing and I 2376 03:10:29,040 --> 03:10:35,460 really have a problem saying that that's enough of a discrepancy that I would say 2377 03:10:33,240 --> 03:10:40,620 that this project doesn't work so I think it works I I think the design team 2378 03:10:37,740 --> 03:10:46,260 has done a good job designing as best you can within again what I think it is 2379 03:10:43,380 --> 03:10:50,040 a very tight community and it's one that I I will support but I do have some 2380 03:10:48,180 --> 03:10:54,960 significant concerns along the lines of what my other fellow Commissioners or 2381 03:10:52,080 --> 03:11:00,200 commissioner has outlined with the the overall aspects of the project itself 2382 03:10:56,819 --> 03:11:00,200 and the way it works and feels 2383 03:11:00,240 --> 03:11:07,319 and commissioner cover Ruiz thank you yeah it's interesting because I was also 2384 03:11:04,080 --> 03:11:14,220 on DRC and I'm remembering a lot of the conversation that took place and uh the 2385 03:11:11,700 --> 03:11:18,060 dense nature of the entire project I in fact I literally remember making the 2386 03:11:15,960 --> 03:11:21,060 comment where are these kids going to play are they going to be playing in the 2387 03:11:19,680 --> 03:11:27,540 sidewalk and they're going to be playing in the street in the parking area I was 2388 03:11:23,640 --> 03:11:34,500 concerned then as I am now that it is a lot in a very compact area however 2389 03:11:32,279 --> 03:11:39,960 affordable housing is something that we direly direly need in Paso Robles I do 2390 03:11:38,100 --> 03:11:46,080 like commissioner Christensen mentioned I do wish that these were homes for sale 2391 03:11:43,520 --> 03:11:50,520 because that's another issue we have is people being able to afford to buy in 2392 03:11:48,779 --> 03:11:55,500 our community we need to keep the people here and in order to keep them here they 2393 03:11:53,040 --> 03:11:59,340 got to be able to afford to purchase and I wish that were the case and I think 2394 03:11:58,200 --> 03:12:05,340 that's just going to be a battle we're going to have for a long time coming 2395 03:12:02,520 --> 03:12:10,740 The Farmhouse look I like it I think the design of the units I like it's it's not 2396 03:12:08,520 --> 03:12:14,880 the units themselves that it that I have an issue with it is how compact 2397 03:12:12,840 --> 03:12:21,240 everything is kind of put in the area and and for the sake of of continuously 2398 03:12:19,080 --> 03:12:26,520 echoing what fellow Commissioners have already alluded to it's just it's a lot 2399 03:12:23,700 --> 03:12:30,840 in one spot and and not sure in this case like 2400 03:12:28,979 --> 03:12:35,399 commissioner kogler has mentioned you know that this minor setback request 2401 03:12:33,180 --> 03:12:39,540 okay is that a make or break type scenario I don't think so I think it's 2402 03:12:38,040 --> 03:12:46,080 livable um I just wish there was more space I 2403 03:12:43,500 --> 03:12:51,540 mean it's such a nice area I wish there was more space just in general and 2404 03:12:49,380 --> 03:12:55,939 everything wasn't so compact um 2405 03:12:52,380 --> 03:12:55,939 and I guess I'll leave it at that 2406 03:12:56,700 --> 03:13:02,160 so I agree with many of the comments from 2407 03:13:00,420 --> 03:13:08,760 my fellow Commissioners um I do think that if if Paso Robles is 2408 03:13:06,120 --> 03:13:13,620 going to get affordable housing um I think we need to think about a more 2409 03:13:11,520 --> 03:13:17,399 dense Community um and it may not be something we're 2410 03:13:15,000 --> 03:13:20,700 used to may not be something we like but it may be some some place where we have 2411 03:13:19,439 --> 03:13:24,899 to go um 2412 03:13:22,080 --> 03:13:29,819 I am not fond of the state promulgating the Adu rules 2413 03:13:26,880 --> 03:13:33,359 um I think Paso Robles is being punished along 2414 03:13:30,840 --> 03:13:37,319 with other communities for some of those communities that had 2415 03:13:35,279 --> 03:13:41,760 exclusionary building practices and that's 2416 03:13:40,080 --> 03:13:48,660 disappointing um but in the end I I do compliment the 2417 03:13:45,620 --> 03:13:52,500 applicant for thinking ever so slightly outside of the box and being able to 2418 03:13:50,880 --> 03:13:57,660 increase the density of their project legally significantly 2419 03:13:55,620 --> 03:14:05,479 um I I think that is um a well-thought plan so with that I 2420 03:14:02,340 --> 03:14:05,479 will entertain a motion 2421 03:14:11,880 --> 03:14:20,160 okay I'm happy to make a motion 2422 03:14:16,859 --> 03:14:24,260 commissioner cover rubies uh I move that we approved draft resolution a approving 2423 03:14:22,260 --> 03:14:28,220 vesting tentative track map 3213 and 2424 03:14:28,520 --> 03:14:35,040 pd22-166 subject to the site-specific conditions of approval 2425 03:14:33,540 --> 03:14:40,380 we have a motion do we have a second I'll say 2426 03:14:37,200 --> 03:14:45,660 any further comment uh roll call please 2427 03:14:42,720 --> 03:14:50,580 commissioner cover rubius aye commissioner Connolly 2428 03:14:48,240 --> 03:14:55,620 aye commissioner Marlowe aye 2429 03:14:51,899 --> 03:14:58,680 commissioner Christensen no commissioner kobler 2430 03:14:57,300 --> 03:15:05,540 aye chairperson Neil 2431 03:15:00,840 --> 03:15:05,540 aye motion passes five to one 2432 03:15:12,960 --> 03:15:15,979 all right 2433 03:15:19,380 --> 03:15:25,340 I think we're on to the consent agenda as soon as I can get to the agenda 2434 03:15:30,300 --> 03:15:37,020 um I do have um a clarification for February 6 DRC 2435 03:15:35,220 --> 03:15:41,399 meeting I believe that was the meeting where I was having incredible technical 2436 03:15:38,640 --> 03:15:45,319 difficulties and I didn't actually join the meeting so if we can um 2437 03:15:45,540 --> 03:15:55,040 line me out that would be great so do I have a motion to approve the 2438 03:15:50,880 --> 03:16:00,200 consent so moved I'll second that any discussion 2439 03:15:57,240 --> 03:16:00,200 roll call please 2440 03:16:01,410 --> 03:16:04,469 [Applause] 2441 03:16:06,300 --> 03:16:13,020 I was getting that correction tracked okay who was the first on that cogler 2442 03:16:10,020 --> 03:16:13,020 Christensen 2443 03:16:16,920 --> 03:16:22,920 all right commissioner kogler aye commissioner Christensen aye 2444 03:16:21,120 --> 03:16:30,420 commissioner Connolly aye commissioner Marlow aye commissioner code rubius aye 2445 03:16:25,439 --> 03:16:36,240 chairperson Neil aye passes 6-0 with the amendment and on to other reports 2446 03:16:32,939 --> 03:16:40,700 passable street ad hoc I I see that there's a meeting next week 2447 03:16:38,520 --> 03:16:46,859 two weeks 27th 27th of the month so I suspect 2448 03:16:44,279 --> 03:16:51,540 there's not an update yeah we're working on that we do have a 2449 03:16:49,020 --> 03:16:57,600 vacancy on that ad hoc committee so we are looking to appoint a member to serve 2450 03:16:54,240 --> 03:17:03,359 on that and attend that next meeting I'd be willing to do that yeah 2451 03:17:00,779 --> 03:17:06,300 anybody else like to attend sir 2452 03:17:04,620 --> 03:17:09,560 saying none hmm 2453 03:17:08,040 --> 03:17:15,200 Mr Christensen you're on it 2454 03:17:11,580 --> 03:17:15,200 so excited thank you guys 2455 03:17:15,420 --> 03:17:23,520 um well we're already almost done that's why I'm excited I'm super excited 2456 03:17:20,660 --> 03:17:26,180 if you're getting one because you think we're almost done 2457 03:17:26,720 --> 03:17:35,100 yeah famous last words [Laughter] 2458 03:17:32,819 --> 03:17:39,660 constraints and opportunities committee zoning code update report I can hardly 2459 03:17:37,439 --> 03:17:43,140 wait to read that yeah no no report tonight we're continuing to just work 2460 03:17:41,340 --> 03:17:49,740 with a consultant on that so development Review Committee rotation 2461 03:17:46,140 --> 03:17:54,300 schedule uh March is cochlear Neil and Christensen we were lucky enough to get 2462 03:17:52,140 --> 03:17:59,580 a reprieve yesterday um but any conflicts in the next month 2463 03:17:56,880 --> 03:18:05,359 or two the only conflict I have I believe is in April and I want to say 2464 03:18:01,920 --> 03:18:05,359 it's the 17th 2465 03:18:06,120 --> 03:18:13,340 yes it would be the 17th I won't be available for that one if 2466 03:18:10,319 --> 03:18:13,340 someone can cover for me 2467 03:18:16,680 --> 03:18:23,340 I I can do that okay thank you commissioner 2468 03:18:21,420 --> 03:18:29,880 and I might be getting way ahead of myself but I I am scheduled to be out of 2469 03:18:26,160 --> 03:18:34,500 town on Monday the 16th of October holy smokes yep I know but we can wait for 2470 03:18:32,220 --> 03:18:38,180 that if we need to but I just already know because I just booked my airfare 2471 03:18:35,939 --> 03:18:38,180 yesterday 2472 03:18:41,779 --> 03:18:49,680 for that we sleep well at night though I can 2473 03:18:46,560 --> 03:18:53,580 probably cover that one for you and now on to planning Commissioners 2474 03:18:52,200 --> 03:18:58,439 comments um commissioner Marla 2475 03:18:55,859 --> 03:19:03,840 uh no comments just uh appreciate being here thanks commissioner Connell yeah 2476 03:19:01,319 --> 03:19:09,120 thank you for uh allowing some mistakes for for a new commissioners 2477 03:19:06,960 --> 03:19:12,779 commissioner Christensen I want to say great job you guys did 2478 03:19:11,100 --> 03:19:16,140 well so I don't think there's really any mistakes your first time is there I 2479 03:19:14,640 --> 03:19:21,479 don't think there you can have as many as you want really yeah I always keep in 2480 03:19:19,020 --> 03:19:24,840 score no no I haven't kept scoring I keep making them all the time and I want 2481 03:19:23,160 --> 03:19:28,620 to thank all the rest Commissioners uh there was a lot on the on the on the 2482 03:19:26,880 --> 03:19:33,420 agenda tonight and I think we did a good job so thank you 2483 03:19:30,479 --> 03:19:37,020 commissioner kogler I also would compliment the two new members you did 2484 03:19:35,460 --> 03:19:41,340 your homework you really jumped in you were appropriate with your discussions 2485 03:19:38,220 --> 03:19:45,960 your points and welcome aboard commissioner cover yeah I was at the uh 2486 03:19:43,500 --> 03:19:49,740 at the dinner and got a chance to meet you guys it was a pleasure meeting you 2487 03:19:47,399 --> 03:19:53,350 but uh welcome aboard officially so appreciate it and I would like to Echo 2488 03:19:52,380 --> 03:19:57,920 the same and again [Music] 2489 03:19:55,080 --> 03:20:01,979 give a sincere gratitude to commissioner kogler for spending two years in the 2490 03:20:00,840 --> 03:20:05,399 seat um 2491 03:20:02,580 --> 03:20:10,500 uh we we all appreciate it very much I think it was a good two years of great 2492 03:20:07,859 --> 03:20:15,420 very well-run meetings um and again thank you so much 2493 03:20:13,260 --> 03:20:18,540 um staff comments got a couple quick things we would also 2494 03:20:17,220 --> 03:20:21,960 like to welcome the new Commissioners congratulations 2495 03:20:19,859 --> 03:20:26,939 um this was a tough agenda tonight so everybody did really well on that and 2496 03:20:24,120 --> 03:20:30,899 the new chair congratulations as well um we do have the Planning Commission 2497 03:20:28,319 --> 03:20:33,359 Academy coming up Marcy is that all coordinated 2498 03:20:32,040 --> 03:20:38,220 we have Commissioners Marlow and Connolly signed 2499 03:20:36,300 --> 03:20:43,140 up I'm working with our finance department to get everything all tied up 2500 03:20:40,500 --> 03:20:47,160 you know in a nice bow for you so once I have that I will get that over to you 2501 03:20:44,939 --> 03:20:51,660 but we do have you at least booked at a place to stay so far so 2502 03:20:49,800 --> 03:20:54,720 and that is a really great conference I think you folks will you guys will learn 2503 03:20:53,340 --> 03:21:00,720 a ton um but I think I went my first year and 2504 03:20:58,200 --> 03:21:06,740 I've been able to pry away time since but it really is a useful time 2505 03:21:04,140 --> 03:21:13,279 and where is it this year oh I'm sorry 2506 03:21:09,620 --> 03:21:13,279 actually Disneyland 2507 03:21:13,880 --> 03:21:22,439 it's that close all right 2508 03:21:18,979 --> 03:21:25,740 a couple other things just um you've probably all been noticing that the 2509 03:21:23,819 --> 03:21:30,479 river's been at record high levels on and off for the last couple weeks we 2510 03:21:28,140 --> 03:21:35,160 have been monitoring that closely we've been periodically activating the 2511 03:21:32,460 --> 03:21:39,180 Emergency Operations Center we thought it was going to flood today it looks 2512 03:21:36,600 --> 03:21:42,779 like it didn't get that high but we're going to watch it next week there's 2513 03:21:40,500 --> 03:21:50,399 another round of storms coming through I think it in January it hit basically 32 2514 03:21:47,399 --> 03:21:57,899 feet at the 13th Street Bridge which is basically a 100 year flood level 2515 03:21:53,300 --> 03:22:03,300 last week it hit 29 feet so it was just at the base flood level So based on that 2516 03:22:00,899 --> 03:22:06,899 we do have evacuation protocols now for all the neighborhoods that are kind of 2517 03:22:04,740 --> 03:22:10,080 right next to it both the industrial and residential neighborhoods so we're 2518 03:22:08,520 --> 03:22:14,880 hoping that you know that's the highest that we will we will have seen those are 2519 03:22:13,080 --> 03:22:21,200 records that we haven't seen since like 95 or 69 but this is an unusual year but 2520 03:22:19,020 --> 03:22:28,620 we're monitoring that so other things going on your next 2521 03:22:24,420 --> 03:22:35,640 meeting will be on March 28th so we've got a new software system for digital 2522 03:22:32,760 --> 03:22:41,100 um distribution and production of agendas the council's been using it for 2523 03:22:38,040 --> 03:22:44,880 about a month or two now the next agenda will be the first test for the Planning 2524 03:22:42,779 --> 03:22:49,260 Commission you won't actually notice a difference but it does change some stuff 2525 03:22:46,439 --> 03:22:54,000 in terms of how we produce it also makes a lot easier to distribute and view the 2526 03:22:52,260 --> 03:22:58,380 agenda digitally I know we've had discussions in the past about digital 2527 03:22:55,979 --> 03:23:01,859 agenda packets for the commission so that's probably something we'll want to 2528 03:22:59,760 --> 03:23:06,600 revisit after we've gotten this new escribe system up and running so just be 2529 03:23:05,160 --> 03:23:12,120 aware things might look a little different next time fonts and things 2530 03:23:08,819 --> 03:23:15,840 like that that's why that is um other projects on that agenda I think 2531 03:23:14,460 --> 03:23:21,840 we're going to have the annual General plan report for you to look at we have a 2532 03:23:19,739 --> 03:23:26,460 multi-family residential project North Spring Street that's scheduled looks 2533 03:23:24,300 --> 03:23:31,620 like a mini storage on Nutwood will likely be on the agenda and then the red 2534 03:23:29,279 --> 03:23:36,180 tail two apartments on Rolling Hills and Creston Road may be on the agenda as 2535 03:23:34,200 --> 03:23:40,859 well so it should be another healthy agenda for you all 2536 03:23:37,920 --> 03:23:46,260 and any other comments uh District tonight uh this pa-13 2537 03:23:43,880 --> 03:23:50,520 there will be other projects like it with adus there will be other projects 2538 03:23:49,020 --> 03:23:57,600 like it that could stay at the plant at the DRC level 2539 03:23:52,939 --> 03:24:01,319 just this project came up because of the request for setback reductions and 2540 03:23:59,279 --> 03:24:06,359 things if it didn't need setback reductions it's possible it could have 2541 03:24:03,540 --> 03:24:12,859 just stayed at the DRC so just keep that in mind we are going to have other uh 2542 03:24:08,939 --> 03:24:19,739 planning areas with similar requests and uh we the other one that's going to 2543 03:24:16,859 --> 03:24:25,680 be coming up is that planning area I think it's uh 15 and 18 Shea Homes there 2544 03:24:23,340 --> 03:24:29,939 are more of your six or seven thousand square foot Lots single family home type 2545 03:24:27,960 --> 03:24:35,660 development so I think that'll be the next project probably probably within a 2546 03:24:32,279 --> 03:24:39,899 month or so that'll be coming to PRC and then just one final item the 2547 03:24:38,460 --> 03:24:46,140 Planning Commission approved that Thorndike development plan on Wisteria 2548 03:24:42,420 --> 03:24:50,220 and germane we did get an appeal for one of the conditions of approval so we're 2549 03:24:48,300 --> 03:24:54,540 working on that for the next Council agenda so we do expect that appeal to be 2550 03:24:52,439 --> 03:24:58,140 heard next week at city council and we'll keep you apprised at the results 2551 03:24:55,859 --> 03:25:03,359 on that that conclude status report great thank you very much do I have a 2552 03:25:00,300 --> 03:25:07,460 motion to adjourn to adjourn and let's just all say I as a second 2553 03:25:08,760 --> 03:25:12,080 thank you very much everybody