1 00:01:21,000 --> 00:01:31,000 So, the five locations that they wanted to look at, the first one was… was the vacant grass lot next to the bar… 2 00:01:37,000 --> 00:01:43,000 kiss, kiss and ride, is what we call it. So they looked at this location, they thought. 3 00:01:43,000 --> 00:01:53,000 being in proximity to the bart. Station, pittsburgh center station, and the kiss and rides, they thought this had some potential for a mobility hub. 4 00:01:53,000 --> 00:02:03,000 um, the downsides on this location was there really wasn't… what they considered a draw for people to be coming here, using transit to come to this location. 5 00:02:04,000 --> 00:02:12,000 I guess, uh, you know, the starbucks. You've got the library, you got the hotel, you got the courts, city hall. 6 00:02:12,000 --> 00:02:20,000 the people who attended the site visit thought that wasn't really a raw enough for transit. 7 00:02:20,000 --> 00:02:26,000 the next location where actually there was two across the street from each other, so this is that railroad and bliss. 8 00:02:26,000 --> 00:02:36,000 so, they looked at both locations. What they liked about railroad is railroad has already been kind of identified as a priority transit corridor. 9 00:02:37,000 --> 00:02:47,000 it's a high traffic corridor in the city. They liked their little proximity to the shopping center that they thought would be a draw for people who were riding transit. 10 00:02:49,000 --> 00:02:57,000 um, for this site here. There wasn't really enough room to do anything with it. 11 00:02:57,000 --> 00:03:04,000 but I did share with them that pittsburgh does have plans to try and redevelop the bliss avenue corridor. 12 00:03:04,000 --> 00:03:10,000 and potentially a mobility hub. Features could be part of that redevelopment, which they liked. 13 00:03:10,000 --> 00:03:20,000 um, this site here actually was their favorite. This is the site that they were recommending that we do. We just built the new class 1 bike trail. 14 00:03:21,000 --> 00:03:28,000 it's shaded, there's space to actually build some amenities, and it's on the railroad, which was attractive to them. 15 00:03:28,000 --> 00:03:37,000 and it's near the fart station. The other locations that we visited was here on atlantic avenue. 16 00:03:37,000 --> 00:03:44,000 we've thought this shopping center would be a great draw for transit users, but it really wasn't. 17 00:03:44,000 --> 00:03:49,000 a friendly, welcoming environment, there's not a lot of trees, no real place to wait. 18 00:03:49,000 --> 00:03:59,000 be a hot parking lot. So, this wasn't… considered very attractive. And the last bot that we visited was just outside of the senior center. 19 00:04:00,000 --> 00:04:10,000 this one had a lot of positives. It's by the delta de anza trail. The senior center would be a draw for transit users. There's a lot of high-density residential. 20 00:04:10,000 --> 00:04:15,000 uh, you have future build, and you have small world park. 21 00:04:15,000 --> 00:04:20,000 so while this was an attractive option, it was a little farther away from the bart station. 22 00:04:20,000 --> 00:04:30,000 which is why they express an interest in moving forward. With… this location here on the road. 23 00:04:34,000 --> 00:04:38,000 some of the features… so, I'm sorry, before I move on. 24 00:04:38,000 --> 00:04:47,000 looking for feedback, do you agree with their assessment that this is the desired location, or is there a… another location that you think would be more desirable for. 25 00:04:47,000 --> 00:04:57,000 I guess, let me try and… I will attempt to define what a transit hub is, because there's really… I'll be honest, it's still not very clear to me. The intent is it's a location. 26 00:04:57,000 --> 00:05:01,000 where you have multiple modes of transportation that interact in one location. 27 00:05:01,000 --> 00:05:08,200 so, you're attracting transit users, vehicular users, bicycle users, and pedestrians. 28 00:05:09,000 --> 00:05:14,000 it's a central area where you're transitioning from one transportation mode to another. 29 00:05:14,000 --> 00:05:20,000 so you're going from a bus. To part, or you're going from over 5. 30 00:05:20,000 --> 00:05:24,000 do a bus, or you're getting dropped off in a car and getting on. 31 00:05:24,000 --> 00:05:34,000 so that's kind of what they envision this full building hub being. Multiple different modes of transportation gathering in one location. 32 00:05:34,000 --> 00:05:44,000 thoughts on this location? I mean, I guess, uh, that's more descriptive than I've seen in previous, like, we had it for a transplant, I think we've had that, like, a definition, but… 33 00:05:47,000 --> 00:05:54,000 what you described is a little bit more detailed. I'm still… kind of like to grasp, like, what this is gonna look like at the end of the time of year. 34 00:05:54,000 --> 00:06:04,000 I know it's probably a common problem, but that would be a common problem. I have the same comments. So… I mean, um, first thought, I'm thinking, like, are, uh, hissenwright is a great one because. 35 00:06:06,000 --> 00:06:12,000 we kind of tried to design that even in the design of that case, if I had there places to go store by. 36 00:06:12,000 --> 00:06:21,000 I think there's the drop-off, um, points. I think you have the walking trails that we just built. 37 00:06:21,000 --> 00:06:31,000 over there as well. So I'm kind of thinking, like, that's probably a better location, the one that you had first up there. Okay. Um… you know, if you go from the hotel, you can walk over to transit. I mean, I don't… 38 00:06:33,000 --> 00:06:40,000 I just don't see this specific… the difference between that spot and the one that they liked, which is right. 39 00:06:40,000 --> 00:06:47,200 in front of a very crowded vehicular standpoint, very crowded street. Right. 40 00:06:49,000 --> 00:06:59,000 yeah, so I saw this slide, so it looks like they're one of them called the restrooms there, too. So, these were some potential options, as the way they described it, of features that would be included in a mobility hunt. And so they asked for feedback, you know, what they envisioned for the pittsburgh one is kind of like a mid-size mobility hub, not a larger mobility hub. 41 00:07:09,000 --> 00:07:14,000 and so the… one of the questions is, what features would you want to see? 42 00:07:14,000 --> 00:07:22,000 I told them I don't want a public restroom. I don't think that would be a good fit for that location, and it'd be problematic, but… 43 00:07:22,000 --> 00:07:32,000 I would love to get your feedback on what, if any, of these features you think we should do. I almost support, like, the kiss and ride was designed to be this, um, to have community space there. I guess we don't have real-time travel information from the same time. 44 00:07:36,000 --> 00:07:44,000 uh, there's lighting. Street furniture, we have a transit shelter, we have that. Living zones kind of have that. 45 00:07:44,000 --> 00:07:49,000 so, we do actually, yeah, so I don't know. Seems like we already have that. 46 00:07:49,000 --> 00:07:57,000 there. Uh, the other one off bliss, the… park and ride. I need that. 47 00:07:57,000 --> 00:08:03,000 seems like we have all similar features there as well. Maybe we can add some community spaces there. 48 00:08:03,000 --> 00:08:08,400 real-time travel information with it. This is hard to… 49 00:08:13,000 --> 00:08:21,000 it is. It is difficult. I think that your feedback that you've given is what I was looking for, so I get an idea of, kind of, your thought process and. 50 00:08:21,000 --> 00:08:31,000 things that you'd be considering. Um, I think at this time, I'm going to pause and see, do we have public comment on this item? 51 00:08:31,000 --> 00:08:37,000 uh, yes, we do. Thank you very much. Uh, bruce olson, pittsburgh, mr. Bicycle. 52 00:08:37,000 --> 00:08:43,000 uh, now, let me be absolutely sure where we're talking about. This is a little bit south. 53 00:08:43,000 --> 00:08:51,000 of the freeway on railroad avenue on the west side of the street. Yes, that is correct. That is correct. 54 00:08:51,000 --> 00:08:58,200 it doesn't seem to me like there's much space there. 55 00:08:59,000 --> 00:09:05,000 yes, so I have to agree with you, we couldn't fit in a public restroom. 56 00:09:05,000 --> 00:09:15,000 but I agree with you. We don't need one. However, it would seem to me, if we want… automobiles drivers to be able to take part in swapping from. 57 00:09:16,000 --> 00:09:21,000 one mode to another, we'd have to put in some parking. 58 00:09:21,000 --> 00:09:30,000 where would we do that? I am sure that the people who own the stores right next. 59 00:09:30,000 --> 00:09:35,000 to there are not going to be too pleased if we have a lot of. 60 00:09:35,000 --> 00:09:43,000 people parking in their areas. I'm not saying this is a bad spot. 61 00:09:43,000 --> 00:09:50,000 well, I don't see how it would work. If we do construct it. 62 00:09:50,000 --> 00:09:58,000 pittsburgh's bicycle community would like to see. That we have some bike racks. 63 00:09:58,000 --> 00:10:05,800 some bike lockers. And connection to the existing bicycle infrastructure in our city. 64 00:10:10,000 --> 00:10:14,200 my last point is, uh… strongly felt. 65 00:10:17,000 --> 00:10:24,000 we've got bike lanes on railroad avenue, we've got the bike path on railroad avenue, we got the bike. 66 00:10:24,000 --> 00:10:31,000 paths on both sides of the freeway going both east and west. 67 00:10:31,000 --> 00:10:35,800 so, from, uh… connection to the bicycle infrastructure. 68 00:10:36,000 --> 00:10:43,800 perspective, this would be a great spot. Um, thank you. Thank you, bruce. 69 00:10:46,000 --> 00:10:56,000 so, um… the consultants who are taking the lead on this are gonna come up with some conceptual ideas, conceptual plans, so we'll share with them our thoughts and opinions on what we'd like to see. 70 00:11:00,000 --> 00:11:07,000 and then we'll be happy to bring you back to this subcommittee anything that we get from them. 71 00:11:07,000 --> 00:11:12,400 any final thoughts before we move on? Thank you. 72 00:11:13,000 --> 00:11:18,000 oh, it did also include, uh… charter of transit does have a website. 73 00:11:18,000 --> 00:11:24,000 with information about their mobility hub, so I include that for informational purposes. 74 00:11:24,000 --> 00:11:28,800 all right. Number three, preferential residential permit parking. 75 00:12:04,000 --> 00:12:10,600 so, why do we have preferential residential permit parking? So, in… 76 00:12:12,000 --> 00:12:18,000 early 2000s, we were getting a lot of complaints from residents who live near. 77 00:12:18,000 --> 00:12:28,000 the pittsburgh bay point bart station. The bart station parking lot was… didn't have enough capacity, it was overflowing with cars, and people were parking in the neighborhoods. 78 00:12:30,000 --> 00:12:34,000 and it was causing a major impact. So, as a result. 79 00:12:34,000 --> 00:12:44,000 uh, the city of pittsburgh adopted an ordinance on march 5th, 2001 that created a preferential residential permit parking policy. 80 00:12:44,000 --> 00:12:50,000 and it set criteria for how a neighborhood can qualify for this permit parking. 81 00:12:50,000 --> 00:12:55,000 it required, like, two-thirds of the residents had to vote to approve. 82 00:12:55,000 --> 00:13:00,000 you had to have over 80% of the street was occupied by cars. 83 00:13:00,000 --> 00:13:06,000 and, um, well, I have the criteria later on, aside of me jumping ahead, I'm sorry. 84 00:13:06,000 --> 00:13:13,000 so we created the policy, march of 2001, and then on april 16th, 2001, we created the first zone. 85 00:13:13,000 --> 00:13:17,000 in that oak hills neighborhood, right across the street from the bart station. 86 00:13:17,000 --> 00:13:24,800 in 2016. Uh, we expanded it to include the houses that front bailey road. 87 00:13:25,000 --> 00:13:30,000 at west leland. They were having a similar problem. 88 00:13:30,000 --> 00:13:34,000 and I have a map, but I'll go over these areas again. 89 00:13:34,000 --> 00:13:44,000 in october of 2017, in anticipation of the pittsburgh center park station opening and their parking lot likely not meeting capacity. 90 00:13:44,000 --> 00:13:54,000 there were concerns from the… of the neighborhood as well, so a… um, permit parking program was… established in the high school village neighborhood. 91 00:13:55,000 --> 00:14:05,000 and then in 2018, going back to oak hills, there was some… people were parking further back into the neighborhood, still causing issues, so that neighborhood was expanded again. 92 00:14:06,000 --> 00:14:16,000 as I discussed, there was criteria established within the policy. Um, two-thirds had to sign within the prepared area, saying they agree with this permit parking program. 93 00:14:19,000 --> 00:14:25,000 80% of the streets had to be fully occupied by cars. 94 00:14:25,000 --> 00:14:32,000 and, uh, it had to be a residential area. 80% of the properties fronting the street had to be residential. 95 00:14:32,000 --> 00:14:39,000 and then a minimum of 25% of the vehicles parked on the street had to be from people who did not live within that neighborhood. 96 00:14:39,000 --> 00:14:45,000 so that was the criteria. And here are our maps. So, as you can see. 97 00:14:45,000 --> 00:14:48,000 in 20… 2001. Where's my mouse? 98 00:14:50,000 --> 00:14:57,000 I lost my mouse. There it is. This… this was the first zone that was created right across from the bart station. 99 00:14:57,000 --> 00:15:03,000 and then 2016, this section here on bailey road was added. 100 00:15:04,000 --> 00:15:06,000 and then in… 2018. 101 00:15:09,000 --> 00:15:19,000 the oak hills neighborhood was expanded to include this area. Okay, so this is the existing limits of the permit parking program in oaks. 102 00:15:31,000 --> 00:15:41,000 for high school village. This is the area that was established near the high school. You can see where the park station is. Here's the bart parking lot. 103 00:15:41,000 --> 00:15:49,000 when it first opened, the parking lot was full. Um, but I don't know if we ever really saw the traffic. 104 00:15:49,000 --> 00:15:55,600 leading into the residential neighborhood, but we preemptively created the zone. 105 00:15:57,000 --> 00:16:07,000 all right. All right. Now, some things have changed since we created the policy in 2001 and started establishing the zones. In may of 2018. 106 00:16:11,000 --> 00:16:21,000 bart extended the service into antioch. And so, instead of everyone coming to the pittsburgh bay point station as the last in the line. 107 00:16:21,000 --> 00:16:27,000 they now were going to the antioch station, and traffic at the antioch station went crazy. 108 00:16:27,000 --> 00:16:34,000 then, in march of 2020, as we all know, we had covid-19, the pandemic, and it completely changed the way people work. 109 00:16:34,000 --> 00:16:41,000 and people's commutes. And even though we've, for the most part, a lot of people have returned to work. 110 00:16:41,000 --> 00:16:47,000 traffic patterns have still changed, and bart ridership has not recovered back to pre-covid levels. 111 00:16:47,000 --> 00:16:53,000 so as a result, both of the parking lots are not even coming close to capacity. 112 00:16:53,000 --> 00:16:55,000 so, an example… 113 00:17:00,000 --> 00:17:04,000 on the left is what the bart station looked like in 2010. 114 00:17:04,000 --> 00:17:14,000 on the right is what it… looks like now. Now, granted, I could not tell you what day of the week or time of the day these photos were taken, but that 2025 is reflective to what we are seeing, as far as levels are concerned. 115 00:17:20,000 --> 00:17:27,000 so, the question is. Do we still need the permit parking within this neighborhood? 116 00:17:27,000 --> 00:17:34,000 there is a cost to run the program. And as people are building adus, they're asking for additional permits. 117 00:17:34,000 --> 00:17:42,000 and so we're issuing more and more permits. We're not getting a lot of complaints from the neighborhood, we're not seeing a lot of people parked in the neighborhood. 118 00:17:42,000 --> 00:17:48,000 and so the question is, at this time. Do we want to consider. 119 00:17:48,000 --> 00:17:52,200 modifying or eliminating. Some of these zones. 120 00:17:54,000 --> 00:18:01,800 so, in the ordinance, it does allow… the city engineer, at any time. 121 00:18:02,000 --> 00:18:09,000 could recommend that we modify or rescind. A preferential residential permit parking. 122 00:18:09,000 --> 00:18:17,000 area, and it would require notifying the public of this proposed change, and then holding a public hearing. 123 00:18:17,000 --> 00:18:21,000 so, we're looking for feedback from the subcommittee on what are your thoughts. 124 00:18:21,000 --> 00:18:25,000 for both the oak hills, and then the high school village. 125 00:18:25,000 --> 00:18:35,000 uh, I think staff's recommendation is more geared towards oak hills, maybe not being needed anymore, and recommending that maybe we dissolve. 126 00:18:35,000 --> 00:18:45,000 that program. And then, for the high school village, I know they were having problems with high school traffic in addition to park, so I don't know… I don't think we feel as… 127 00:18:45,000 --> 00:18:54,000 strongly one way or the other on that recommendation. This time, I'll turn over some… thoughts or questions? 128 00:18:54,000 --> 00:18:59,000 do you still see in the oak hills, do we still see issues with the apartment complex? 129 00:18:59,000 --> 00:19:09,000 overflow parking onto that street, residential street. That was not… when we met with the police department to discuss this issue, they did not bring that up as a problem. 130 00:19:19,000 --> 00:19:28,000 I don't… it makes sense. Another strategy could be to test it for a 3-month window. 131 00:19:28,000 --> 00:19:38,000 I don't know, but somehow, maybe not completely dissolve the area, just in case. Something changes, and we… so we see a dramatic… maybe it is the apartments, or somebody's coming over there, and then… 132 00:19:40,000 --> 00:19:48,000 instead of having to recreate, I don't know if that's an extra step or not, to give a little more flexibility before making it a permanent dissolution. 133 00:19:48,000 --> 00:19:58,000 to your point, what happens if… you know, we did get rid of it and wanted to bring it back, we didn't have to rewrite the code, just the standard. 134 00:19:58,000 --> 00:20:08,000 so, I mean, one of the options we could do what garrett is recommending, and we… we vote to… temporarily remove it for a 3-month trial period and see if there's an issue, at which time, we can then bring the item back for formal, either saying, nope, it is needed, let's keep it in place, or we can dissolve it. 135 00:20:17,000 --> 00:20:27,000 if it does get dissolved, and we start having problems, we would go through the process of doing the survey to see, does it still meet the criteria to then recreate. 136 00:20:27,000 --> 00:20:33,000 the zoning. Is there a way to survey the areas? 137 00:20:35,000 --> 00:20:44,000 whether it's door-to-door, sample size, or, well, people will know anymore, so that's gonna be weird. But maybe, like. 138 00:20:44,000 --> 00:20:50,000 paper survey. We can do a mailer, we can do a mailer, um. 139 00:20:50,000 --> 00:21:00,000 like you said, people generally don't respond nowadays, but yes, we could try and do some outreach and get the opinions of the neighborhood. People do do… I get a lot of stuff through nextdoor thrown… like the utility, stuff like that. How many people are supposed to be permitted? 140 00:21:12,000 --> 00:21:21,000 in that area. And how many homes are included in the zone? Uh-huh. I unfortunately don't have an answer. I'd probably look at to see how many people are renewing. 141 00:21:21,000 --> 00:21:31,000 maybe there's a way you can do a survey through nextdoor and say, if you live in this… the challenge with nextdoor is you can't create the zone, yeah. So… and people outside of that neighborhood could also see and comment. So it'd be hard to make sure that the responses you're getting are really from the people who lived in that zone. 142 00:21:38,000 --> 00:21:42,000 I was asking about the renewals. I didn't know it worked like that. 143 00:21:42,000 --> 00:21:49,000 so, they're supposed to renew their permits every year. That has not been the practice. 144 00:21:49,000 --> 00:21:57,000 so, they have not renewed in a very long time. I posted this survey. 145 00:21:57,000 --> 00:22:03,600 um, superficial. This obviously would be a much more focused and. 146 00:22:04,000 --> 00:22:10,000 but our larger ones, what, 20,000, I guess, is what we spent, but citywide, that's obviously your population. 147 00:22:10,000 --> 00:22:15,000 which blessed them out. How much does this program cost? 148 00:22:15,000 --> 00:22:25,000 so, it does take some steps. So, we don't charge the residents any fee. There's no cost to them for having to permit part. So, for us, it's really the staff time to manage it. 149 00:22:28,000 --> 00:22:38,000 um, which is minimal. We… the cost of printing and distributing the permits, so when someone needs a new permit, or when someone moves in or out, there's processing of new permits. 150 00:22:38,000 --> 00:22:46,000 and then, uh, replacing the signs. So, every 7 years, the signs are gonna fade, you're gonna need to replace the signs. 151 00:22:46,000 --> 00:22:56,000 and then the enforcement side. Right, so would people call the police department saying there's someone parked that's not authorized, the police do have to respond and issue that citation? 152 00:22:59,000 --> 00:23:09,000 and what they share is oftentimes the complaints they are currently getting. It's someone who's visiting someone, but didn't get the visitor tag to put it on. 153 00:23:11,000 --> 00:23:18,000 every month, I deal with the survey. See what happens, but also, like, the 3-month idea, too. 154 00:23:18,000 --> 00:23:28,000 staff can reach out to our polling entities. Um, and find out if there is a link to the best way to… 155 00:23:28,000 --> 00:23:34,000 gather some data. Is there a way that we can see how many people have… 156 00:23:34,000 --> 00:23:43,000 how many residents have renewed their program? Yes. Yeah, we have… we do have a spreadsheet with all the residents and their permits. 157 00:23:43,000 --> 00:23:49,000 so we can get that information. I just wasn't prepared, and I should have been better prepared for that. 158 00:23:49,000 --> 00:23:53,000 I do want to pause, though, and see, do we have public comment on this item? 159 00:23:53,000 --> 00:24:00,000 all right. Thank you very much. It'd still be brutals and mr. Bicycle. 160 00:24:00,000 --> 00:24:07,200 thank you for inviting the comment. And, uh, thank you for including. 161 00:24:11,000 --> 00:24:21,000 bicycle infrastructure throughout the city when you're doing maintenance and new construction on our streets and roads. 162 00:24:21,000 --> 00:24:27,600 now, we understand that. We're not under pressure right now. 163 00:24:28,000 --> 00:24:37,000 but the bicycle community is concerned. That we might lose use of the bike lanes. 164 00:24:38,000 --> 00:24:46,000 on bailey road and west leland road, if parking at some time in the future becomes a problem. 165 00:24:46,000 --> 00:24:53,000 the individual could just park their car in the vice lane, and that would not be good. 166 00:24:53,000 --> 00:25:02,000 now, we have… standard 4-foot bike lanes. We have a 4-foot bike lane and a painted. 167 00:25:02,000 --> 00:25:12,000 uh, extra area for more space between the moving automobile. And the bicyclists. Then we could add… 168 00:25:12,000 --> 00:25:22,000 either k-rail or pixie sticks. In the painted area between the automobiles and the bike lane, or… 169 00:25:22,000 --> 00:25:28,000 we could add a 10-foot sidewalk on each side of the street. 170 00:25:28,000 --> 00:25:38,000 and not have any… bicycle facility marked on the street, and have shared facility pedestrians, and bicycles. 171 00:25:40,000 --> 00:25:50,000 so, I guess… I'm speaking in vague, broad generalities now, and uh… pittsburgh's bicycle community is not really concerned, as you had mentioned, about the city not being particularly concerned about this, but at some time in the future. 172 00:26:00,000 --> 00:26:06,000 we might have to be concerned. Thank you. Thank you. 173 00:26:10,000 --> 00:26:14,800 any other questions or thoughts inside of it? 174 00:26:17,000 --> 00:26:27,000 so, we will look into polling. And if we do bring this forward, we will consider doing it at the trial period. Is that… do you want us to do this for both zones, both the high school village and oak hills? 175 00:26:31,000 --> 00:26:41,000 yeah, I think there's different issues. Because I think oak hill's experienced it. It feels like a reactive thing that was put in. I think the one here village. 176 00:26:41,000 --> 00:26:51,000 I think it was proactive based on public comment when. This one, the kissing writers, put in the brief or something, yeah, so I don't know that they actually experience. 177 00:26:51,000 --> 00:26:55,000 right. I think some of the public comment, if I recall, there were some. 178 00:26:55,000 --> 00:27:02,000 residents who were saying there were some overflow parking by the students that was impacting those students. 179 00:27:02,000 --> 00:27:09,000 I could see them being more concerned about high school traffic than they are the bart traffic. 180 00:27:09,000 --> 00:27:14,400 okay, thank you for your feedback. We should connect. 181 00:27:15,000 --> 00:27:22,800 who was in contact with canada? Yes, we will… this will come back. 182 00:27:57,000 --> 00:28:04,000 so the city received a request for speed humps. On burton avenue between west leland and william way. 183 00:28:04,000 --> 00:28:14,000 and we just wanted to share the results with you on that. So, uh, this… map shows you the limits of the area that was surveyed. 184 00:28:17,000 --> 00:28:23,000 and so, we have an existing policy for traffic call speed humps. 185 00:28:23,000 --> 00:28:27,000 and criteria for… that a street needs to meet in order to qualify. 186 00:28:27,000 --> 00:28:35,000 and so, what you'll see here on top is we have that list of evaluation criteria, and we mark the ones that it met, which is a lot of them. 187 00:28:35,000 --> 00:28:38,000 but we didn't mark the ones that it didn't need to. 188 00:28:38,000 --> 00:28:48,000 so, it did not meet the speed requirement, so at least 15% of vehicles travel at speeds 6 miles per hour or more above the posted speed limit. 189 00:28:48,000 --> 00:28:58,000 so there's post-speed limit on burton avenue is 25. So you needed to have 15% of the vehicles traveling over 31 miles per hour. The results of this speed survey is it was just over 1%. 190 00:29:00,000 --> 00:29:07,000 so it did not meet the criteria. You're also required to have at least more than 500. 191 00:29:07,000 --> 00:29:13,600 uh, the average daily traffic. And, um, we had just under 500. 192 00:29:14,000 --> 00:29:19,000 so it didn't meet the volume amount, barely, but it also didn't meet the speed. 193 00:29:19,000 --> 00:29:25,000 so, based on our criteria and the data that we've collected. 194 00:29:25,000 --> 00:29:29,000 uh, the recommendation is going to be to deny the request for speed humps. 195 00:29:29,000 --> 00:29:33,000 so we will work with the police department on other traffic calming. 196 00:29:33,000 --> 00:29:38,000 measures that we can do, whether that's enforcement. Put another speed trailer. 197 00:29:38,000 --> 00:29:47,000 signage, we'll look at other things, but at this time, it doesn't meet the requirements for speed. 198 00:29:47,000 --> 00:29:57,000 do we implement other traffic cognitions already, like the trailer? We have not, so that's why that box hasn't been marked either. We have not done that yet. So, but we will continue to explore that as an option. 199 00:30:01,000 --> 00:30:11,000 and then will this be shared with the applicant? Yeah, everyone who signed the petition should get a copy of the results, so they… yeah, that hasn't happened yet. It will after tonight, but… 200 00:30:18,000 --> 00:30:24,000 I think it's good that way people understand why all these speed limits aren't being considered for. 201 00:30:24,000 --> 00:30:31,000 installed, because I get this question a lot, not just in this area, but in other areas of the city. 202 00:30:31,000 --> 00:30:39,000 and I understand we'll be collect data, you know, I'm sure there's a good sample size, right? But when people live there. 203 00:30:39,000 --> 00:30:49,000 they hear the one, you know, car that's speeding through, and that's their representation, oftentimes. Right. Like, a lot of… although the data may not show that, right? So, I can understand why people would like to get frustrated, because all it takes is one speeder to. 204 00:30:56,000 --> 00:31:04,000 get a kid, or something like that, so I understand. The concerning, but we also can't have the speed up until industry in the city. 205 00:31:04,000 --> 00:31:13,000 right. We have to prioritize accordingly, so… okay. Is there any public comment on this item? 206 00:31:13,000 --> 00:31:16,000 right. Alright, any further discussion? 207 00:31:27,000 --> 00:31:33,000 also, that, um, like, the application process posted on our social media. 208 00:31:33,000 --> 00:31:43,000 um, like, that link to the application. Yeah, we could. Just so that we could maybe… because how many of these would get a year, you know, long after? 209 00:31:44,000 --> 00:31:53,000 I don't know. A lot of them get processed without coming to my level, so I can… I can look. I would… we get a fair amount of. 210 00:31:53,000 --> 00:32:03,000 complaints of speed. We don't get that many requests for specifically speed humps with a petition. With the petition, so you're probably looking 5 to 10 a year. 211 00:32:03,000 --> 00:32:09,000 but we can still look at also making even a video on, hey, are you having, you know, friend. 212 00:32:09,000 --> 00:32:15,000 this is the process. You can go through that very well. 213 00:32:15,000 --> 00:32:21,000 yeah, because I was surprised when I looked at this, and I was like, oh, that's how you do that. That's how you make the request. 214 00:32:21,000 --> 00:32:25,000 yeah, we can do that. Well, we have information on our website, but sometimes the videos is. 215 00:32:25,000 --> 00:32:30,000 is very educational, and the community outreach team is making up a new intern, you know, project. 216 00:32:30,000 --> 00:32:40,000 there's also, like, an ai tool right now, but, like, you can just, like, process. I think the city of copley does it for their, um, agendas. 217 00:32:42,000 --> 00:32:52,000 all right, item 5, roads outreach debrief. How we doing? Ooh, I've been at some elevator speech time. Okay. So, uh, city councils, part of their annual strategic plan, created an objective to increase the pavement condition index to 65 by 2029. 218 00:32:59,000 --> 00:33:06,000 as part of that, some of the implementation measures, including holding monthly roads town hall meetings. 219 00:33:06,000 --> 00:33:12,000 doing two community surveys and considering a sales tax measure. So we just wanted to spend a little bit of time and kind of debrief you. 220 00:33:12,000 --> 00:33:20,000 since we just finished our last town hall meeting. This powerpoint thing is, um. 221 00:33:20,000 --> 00:33:27,800 those are doing nothing. For the mouse… there's the mouse. Come on! 222 00:33:31,000 --> 00:33:35,800 thank you. All right. So, we've held 10… 223 00:33:39,000 --> 00:33:46,000 rhodes town halls, the initial goal was to do 8 town hall in each of the 10 zones that we created. 224 00:33:46,000 --> 00:33:53,000 we wanted to go out to the residence. Where they live, try and meet them where they are. 225 00:33:53,000 --> 00:33:58,000 we thought this would improve attendance and get them to really engage with us. 226 00:33:58,000 --> 00:34:08,000 and share with them not only our program that we've developed, but the challenge that we have with the lack of funding. So what I've done is I've put together this map that showed the location of all 10 town hall meetings. 227 00:34:11,000 --> 00:34:16,000 so, in these boxes, the top number, that's the date of the town hall meeting. 228 00:34:16,000 --> 00:34:24,000 then we have the location of the town hall meeting, and that bottom number is how many people attended. 229 00:34:24,000 --> 00:34:30,000 so, jordan, can you work your magic and get this to go away again? 230 00:34:30,000 --> 00:34:35,000 see? He did it. Just go away. Wave your hand. All right. 231 00:34:35,000 --> 00:34:42,000 so, the first one was held in zone 3, uh, it was at the church of jesus christ of latter-day saints on golf course road. 232 00:34:42,000 --> 00:34:52,000 and we had two people show up, but we had a good… uh, the next one was in zone 4. It was at the meadows mobile home park, because my mouse is just not showing up. 233 00:34:53,000 --> 00:35:03,000 uh, and we had two people show up there, and it was a couple, really nice, we had a good conversation with them about the work that was coming up in their neighborhood. They were really excited. 234 00:35:03,000 --> 00:35:12,000 next, we did zone… uh, we took a break in december. We figured we wouldn't be able to get people to attend, so next we did it in zone 7 at the senior center. 235 00:35:12,000 --> 00:35:21,000 and before, we were just notifying the people who lived in those zones. We wanted to have a focused effort, but because of the little numbers, we said, you know what, let's just divide everyone. 236 00:35:21,000 --> 00:35:25,000 we got 9 people to come to this meeting, which was great. We had a great meeting. 237 00:35:25,000 --> 00:35:33,000 uh, at the senior center, we had a good conversation. And we got people from several zones, but a lot of them were actually in zone 7. 238 00:35:33,000 --> 00:35:41,000 the next meeting was held at the library in zone 6, and we had 5 people. I think that's… it was 5 adults? 239 00:35:41,000 --> 00:35:50,000 some of them brought their kids. It was a decent turnout. We had a good time. They had great questions. They really appreciated the meeting. 240 00:35:50,000 --> 00:36:00,000 uh, the next one was… thank you so much, thank you. Uh, zone 5 at the marina center, again, it was 3, but it was… 241 00:36:00,000 --> 00:36:05,000 couples, or father-son, so the room is probably more like 6, but. 242 00:36:05,000 --> 00:36:10,000 only 3 people signed in. Uh, we had a good conversation again. 243 00:36:10,000 --> 00:36:20,000 um, but not very well attended. The next… the best one was the next one. That's because it was part of the nit. We did a present… we did our presentation at the nit. It was a full room at the marriott. 244 00:36:21,000 --> 00:36:24,000 and we had a lot of engagement, a lot of conversations. 245 00:36:24,000 --> 00:36:28,000 uh, the next one in zone 9 was held at future build. 246 00:36:28,000 --> 00:36:38,000 and we had 3 people attend that event. Now, we were getting a lot of feedback, gee, this is great, could you do a virtual meeting? It might be hard to attend in person, so we said, alright. 247 00:36:39,000 --> 00:36:43,000 in zone 10, we couldn't find a good facility, so we did a virtual meeting. 248 00:36:43,000 --> 00:36:49,000 we got one person. And we said, you know what? Let's try that again. 249 00:36:49,000 --> 00:36:53,000 for zone 2, let's have another virtual meeting. We got two. 250 00:36:53,000 --> 00:37:02,000 but we had a great meaning, right? Our own bruce olson attended that meeting. We had a great conversation, except the technology wouldn't let me hear you first. 251 00:37:02,000 --> 00:37:09,000 the last one, we thought, you know what, let's go to the people. We went to the car show, and we set up a booth, and we had a table. 252 00:37:09,000 --> 00:37:19,000 and no one. Um, but we had a good time, we had some good music, it was the hottest day of the year, but that was okay. 253 00:37:19,000 --> 00:37:24,000 we would invite people to come talk to us, they just wanted to listen to the music. 254 00:37:24,000 --> 00:37:30,000 I mean, while we didn't get good numbers, the people who did come had great questions. 255 00:37:30,000 --> 00:37:37,000 they really appreciated the information, they were really happy with the work that the city was doing. 256 00:37:37,000 --> 00:37:43,000 so, we shared with them the website and the map, the interactive map they thought was fantastic. 257 00:37:43,000 --> 00:37:49,000 so, I'm gonna… since you have a hard stop, I'm gonna turn over to garrett to take over on the survey. Real quickly. 258 00:37:49,000 --> 00:37:55,000 what… it also is somewhat representative in the polling data that we've done over the last 3 years. 259 00:37:55,000 --> 00:38:00,000 what I'd highlight to you is the second column on the right would be probably yes. 260 00:38:00,000 --> 00:38:08,000 column, if you will. Basically, we've done a poll at the same time in june, july of each year in 23, 24, 25. 261 00:38:08,000 --> 00:38:14,600 potential yes for a half-cent, uh, increase in sales tax. 23% was 48%. 262 00:38:15,000 --> 00:38:25,000 then it went to 46% and 42%. So actually. The support for half-cent sales tax has gone down somewhat, although in the margin of error rates, uh, actually still kind of worked. 263 00:38:25,000 --> 00:38:30,000 um, but what I think that shows is a lot of people are seeing the road improvements. 264 00:38:30,000 --> 00:38:33,000 and are comfortable with the pace that's going on right now. 265 00:38:33,000 --> 00:38:41,000 um, if you look at even the support of the quarter cent, it has not gone up, despite trying to increase and make sure people realize. 266 00:38:41,000 --> 00:38:45,000 hey, do you want your streets done? Do you want them done? Or even more? 267 00:38:45,000 --> 00:38:51,000 there's just not that buy-in right now. So, what we're laying out or recommending is. 268 00:38:51,000 --> 00:38:56,000 keep on doing the tenure. Pattern that's going on. 269 00:38:56,000 --> 00:39:05,000 and trying to move forward, um… with those trees, as it's laid out right now. Wish we had better news to say, wow, we can get. 270 00:39:05,000 --> 00:39:11,000 three times as many done, or four times, four zones in one, that it just doesn't seem to be good. 271 00:39:11,000 --> 00:39:18,000 the mood of the… something about the community. That's really what we have here. That's an update. 272 00:39:18,000 --> 00:39:26,000 okay. Okay. Elevator done. Before I turn it over to the subcommittee, do we have any public comment on this item? 273 00:39:26,000 --> 00:39:31,000 yes, we do. Good evening from seoul scientific church. Mr. Bicycle. 274 00:39:31,000 --> 00:39:40,000 um, I'm sorry we had technical problems. I would like to add a little bit to my comment of that evening. 275 00:39:40,000 --> 00:39:49,000 and that is, thank you for your… work you're doing with including infrastructure for all modes. 276 00:39:49,000 --> 00:39:59,000 of transportation. Transit, pedestrians, bicycles, and automobiles when you're working on the streets and roads in the city of pittsburgh. I can't say that enough. 277 00:40:02,000 --> 00:40:11,000 I wish other cities in our area, or at anywhere near as interested in sharing the wealth. 278 00:40:11,000 --> 00:40:21,000 as the city of pittsburgh is. That said… pittsburgh's bicycle community would like to see more bike lanes. 279 00:40:21,000 --> 00:40:29,400 we would like to see more connected bicycle infrastructure. And we have two projects. 280 00:40:30,000 --> 00:40:36,600 that we would like to see constructed. Uh, number one is… 281 00:40:37,000 --> 00:40:45,400 continue… the bike path… now, on california avenue on the north side of highway 4. 282 00:40:47,000 --> 00:40:51,800 this time between harbor street. And leverage road. 283 00:40:54,000 --> 00:40:59,000 and if we do that, we would also want a crosswalk. 284 00:40:59,000 --> 00:41:08,600 on the south side of california avenue at harbor street. Okay, that's… that's one. 285 00:41:09,000 --> 00:41:15,000 caltrans will probably be interested in seeing that go forward also. 286 00:41:15,000 --> 00:41:21,000 the second project is… we would like to see a bicycle path. 287 00:41:21,000 --> 00:41:31,000 built in the pg&e high-voltage infrastructure. Between the west end of frontage road by the city well. 288 00:41:33,000 --> 00:41:43,000 and the rrfb crossing by the, uh. The school, I forget its name right now, but it's on, uh… 289 00:41:44,000 --> 00:41:52,400 on range road. That would be a connection between existing pieces of bicycle infrastructure. 290 00:41:53,000 --> 00:42:00,000 and it would be wonderful if, uh. If we could get a grant to do that. 291 00:42:00,000 --> 00:42:06,000 and thank you very much. Thank you. All right, thoughts, feedback from the subcommittee? 292 00:42:06,000 --> 00:42:13,000 just appreciate all the outreach that was done. Uh, you know, maybe not so great turnout in most cases, but I think. 293 00:42:13,000 --> 00:42:22,000 um, definitely appreciate trying to get the voice out there. The, um… the message as well. I mean, I know there's also, um. 294 00:42:22,000 --> 00:42:27,000 a news piece as well, right, that we were able to comment on, which I think. 295 00:42:27,000 --> 00:42:37,000 also expressed, um, kind of the situation in terms of the backlog of roads, so… um, definitely not for lack of effort, but I think what I see here with the polling data is. 296 00:42:39,000 --> 00:42:49,000 important issue. We like how things are going, at the rate they're going. If you want to accelerate it, then we find the money elsewhere. So, not a sales tax increase, so… um, which is fine. 297 00:42:53,000 --> 00:42:58,000 I wish it would be a whole different, but… right. You know. 298 00:42:58,000 --> 00:43:03,000 we're doing a good job. I mean, I think relative to where we were even. 299 00:43:03,000 --> 00:43:11,000 5-6 years ago, I mean, tremendous improvements already. Um, so I'm all for this 10-year plan. 300 00:43:11,000 --> 00:43:14,000 um, and if we can get extra dollars here and there. 301 00:43:14,000 --> 00:43:22,000 more accelerated. Thank you. I agree. My only comment is I just always appreciate the data and the background. 302 00:43:22,000 --> 00:43:26,000 um, so that we can share with folks that, you know, we're actually putting. 303 00:43:26,000 --> 00:43:31,000 we're being intentional from a data-driven place to make choices or decisions. 304 00:43:31,000 --> 00:43:36,000 to align for our plan. So, just great job, as always. I really appreciate. 305 00:43:36,000 --> 00:43:40,000 being able to understand the story of how we got here. 306 00:43:40,000 --> 00:43:49,000 what we're doing, why we're doing, uh, what we're doing. Um, to help us make decisions, which is, you know, support recommendations between, so just thank you. 307 00:43:49,000 --> 00:43:59,000 well, it was our pleasure. All right, with that, we'll move to item number 6. Well, we did have a hard stop, so I gotta do it. Thank you very much. 308 00:44:00,000 --> 00:44:10,000 vice mayor adams, would you like to continue? Yeah. All right. I'll take amanda. I will turn it over to mariana menda to go over a couple groom program. 309 00:44:12,000 --> 00:44:18,000 yes. So, um. This last round, we've completed two projects. 310 00:44:18,000 --> 00:44:26,000 our curb ramp projects, um, for this fiscal year have been completed, as well as the city park restroom. 311 00:44:26,000 --> 00:44:31,000 the 8-pack one that opened up on july 17th, I believe? 312 00:44:31,000 --> 00:44:40,000 um, and good news, if we have found additional funding, so we are starting the process to start the second restroom, which is the small one by the dabby. 313 00:44:40,000 --> 00:44:47,000 baseball field. Yes. Hopefully bringing an item to council soon, recommending, uh. 314 00:44:47,000 --> 00:44:53,000 funding and executing a contract for that additional restroom. Although we're excited for them, yes. 315 00:44:53,000 --> 00:45:03,000 and then we have 12 projects in construction. And active, we have 9 projects actively in construction, and then we'll be bringing 3 of those to the, um, the second. 316 00:45:04,000 --> 00:45:10,000 meeting in september to completion. That's our crestview citywide, and our zone 4. 317 00:45:10,000 --> 00:45:14,000 um, as john and we just talked about all of our 10 sounds. 318 00:45:14,000 --> 00:45:24,000 zone 4 has just been… we're wrapping that up, um, taking the staff and resu to city council on the second meeting, and, um, we have also in-house started doing our assessment for zone 7. 319 00:45:27,000 --> 00:45:31,000 so the first order of operations to start a new zone is doing the street assessment. 320 00:45:31,000 --> 00:45:41,000 so, um, our savon reese, our engineer in-house, he's doing. Starting to drive some of the streets and do this analysis and all of that stuff. So that's happening now. Yes. Okay. That is happening now. Um, on our bart project, um. 321 00:45:47,000 --> 00:45:55,000 we… I know that there's been a lot of complaints on the landscape on our greenbelt along railroad. 322 00:45:55,000 --> 00:46:01,000 so one of the things that we're doing, um, with the funding that we have is we're looking at. 323 00:46:01,000 --> 00:46:06,000 a new, complete new set of landscape improvement plans, and we're hoping to take that. 324 00:46:06,000 --> 00:46:10,000 out to bid maybe in the next month, so then we can. 325 00:46:10,000 --> 00:46:20,000 revamp and are rebuilt, so… yeah, and we're not… our recommendation isn't to put back the sod that was there before, but to go back with more of a drought-tolerant native plant with the bubble system. So, we do recognize the impact this project had on the existing landscaping, so we want to do something to really beautify the corridor. 326 00:46:33,000 --> 00:46:43,000 yeah, I'm good. Yes, and then, um, moving on to another project is our pittsburgh premier fields. 327 00:46:43,000 --> 00:46:47,000 we are, um, hopefully going to be done with this project. 328 00:46:47,000 --> 00:46:55,000 before our date, which was october 27th, so we're hoping. To be then, hopefully, beginning of october. 329 00:46:55,000 --> 00:47:03,000 so, yes, that one has moved quickly, so… yeah, or hopefully a ribbon-cutting event in october of this year. 330 00:47:03,000 --> 00:47:09,000 that'd be nice. Every time I drive by, there's something new. I'm like, oh, they did that? I don't know, they did that, it's kind of cool. 331 00:47:09,000 --> 00:47:18,000 it's been a great contractor to work with. Oh, certainly. He's been really good. Um, today we had our bid opening for the california theater. 332 00:47:18,000 --> 00:47:24,000 and we got 3 beds, all under the asking price, so it was really good. Really excited. 333 00:47:24,000 --> 00:47:30,000 so we're going to kick off construction probably in the next… three weeks for that one. 334 00:47:30,000 --> 00:47:35,000 that's for the underground… not the underground, sorry, the below stage restroom. 335 00:47:35,000 --> 00:47:40,000 for the… oh, they got it, okay. Yes. Yeah, they've been talking about that. Yes. 336 00:47:40,000 --> 00:47:47,000 so we're really excited about that one. Um, I already talked about sun 7. 337 00:47:47,000 --> 00:47:51,000 and another project that I do want to talk about is our lynchide. 338 00:47:51,000 --> 00:47:55,000 so, this is our traffic calming project at the intersection near lynnshide. 339 00:47:55,000 --> 00:48:05,000 um, we received additional funding, uh, additional cdbg funding. So we are looking, unfortunately, not what we need for this project. This project, the construction of this project, is around $760,000. 340 00:48:09,000 --> 00:48:14,000 this is for 3 roundabouts, another traffic… and other medians, and other features. 341 00:48:14,000 --> 00:48:19,400 but we only received 78 right now, 78,000 from cdbg funds. 342 00:48:21,000 --> 00:48:30,000 we are looking to see where we can get additional funding, or just phase the project. Yeah. We're looking like we're going to phase the project and reduce the scope. 343 00:48:30,000 --> 00:48:34,000 to just the main cons… the main problem. So we're looking at different. 344 00:48:34,000 --> 00:48:41,000 estimates, and we're probably going to have to phase this out, but… we're gonna do at least one phase of the project. 345 00:48:41,000 --> 00:48:51,000 by this fiscal year. Okay. And that's really all I wanted to highlight, unless you're seeing. One more I'd like to highlight on that same page, page 3, is the delta de anza multimodal trail safety improvement project. 346 00:48:56,000 --> 00:49:06,000 this is the one we got grant funding a couple years back. We're finally ready to start working on this project. We put out a request for qualifications, and we've selected what we think is the preferred consultant, and so we'll be bringing an item to council here soon to award a design contract. 347 00:49:16,000 --> 00:49:23,000 with this consultant, and the first step will be doing a lot of community outreach to help develop. 348 00:49:23,000 --> 00:49:33,000 what is the scope of this project? So this project is to do safety improvements and enhancements along the section within the city of pittsburgh, as well as the county. 349 00:49:34,000 --> 00:49:44,000 contra costa, in the bay point area. Uh, we envision this project really focusing on the trail crossings and enhancing them to be safer. 350 00:49:44,000 --> 00:49:49,000 and make more focus towards the bicyclists and pedestrians, and less on the vehicles. 351 00:49:49,000 --> 00:49:59,000 um, but that's where we're going to be doing a lot of outreach to see what is it that the community really wants to do. Because, again, it's… how long the trail is. 352 00:49:59,000 --> 00:50:04,000 we can only do so much. Yeah. So where do we want to prioritize our efforts? 353 00:50:04,000 --> 00:50:14,000 do we help protect the green flag lanes in the city? I don't know how to… we have some bike lent… green bike lanes in the city. They're on railroad avenue as you go, um. 354 00:50:15,000 --> 00:50:25,000 towards old town, also here at the freeway interchange. So, whenever there's, like, a conflict point, like a merge, or an area where there's a lot of. 355 00:50:25,000 --> 00:50:35,000 by splits versus cars, we put in the green pavement to really highlight to the vehicles, this is a bike lane, look out for bikes. Okay, yeah, I don't know if I don't… I'll pitch… I'll look… yeah. Are you thinking also that… because there's also green bike lanes that have little bollards right next to it, were you looking at… were you thinking about the bollards, or just the green bike? I just wasn't… I was like, I don't know what to look for. I was just wondering if we have them, so now… I know, I saw that system. 356 00:50:53,000 --> 00:51:02,000 I'll tell you where they are. Yeah. Yes, we do have them. And the green bike lanes is one of the things that we'll look at. 357 00:51:02,000 --> 00:51:08,000 um, as part of this project. If that helps to sort of enhance those constitutes. 358 00:51:08,000 --> 00:51:17,000 yeah, visual. I'm gonna go take a drive. Is there any public comment on this item? 359 00:51:17,000 --> 00:51:27,000 fantastic. All right, thank you. Uh, with that, we'll go to item 7, subcommittee and staff reports or remarks. Are there any… 360 00:51:27,000 --> 00:51:37,000 july, it's very important. I love this every time. I mean, excuse me, this is my next favorite thing. Yep, yep, oh, it wasn't this, so… 361 00:51:38,000 --> 00:51:48,000 I love this. Thank you. That's my remark. You will. Thank you, I appreciate the feedback. You're welcome. With that, we'll go ahead and adjourn the meeting. Thank you very much for your time. 362 00:51:49,000 --> 00:51:52,600 thank you, chris, you're coming.