1 00:00:10,000 --> 00:00:18,520 Good evening, welcome to the March workshop on the Simmer's property, annexation petition, 2 00:00:19,440 --> 00:00:29,800 AXCP-2024-01. Located at 304 apples church road. Tonight we have our commission members, 3 00:00:30,500 --> 00:00:37,020 staff, and the applicant present. This is the opportunity for us to kind of talk through 4 00:00:37,020 --> 00:00:42,620 the project, interface directly with the applicant and staff, and ask pertinent questions 5 00:00:43,040 --> 00:00:45,640 so that we can have a better understanding of the scope of the project. 6 00:00:47,080 --> 00:00:49,660 So we'll kick it off to Kelly. 7 00:00:50,100 --> 00:00:55,000 I know you have some new notes on, are we going to wait till the actual meeting for that? 8 00:00:57,340 --> 00:01:00,860 It's all submitted, so I mean, we can workshop what we have. 9 00:01:01,180 --> 00:01:01,400 Okay. 10 00:01:01,660 --> 00:01:02,700 I mean, yeah, we can talk about that. 11 00:01:02,920 --> 00:01:03,120 Okay. 12 00:01:03,860 --> 00:01:04,980 I think that we should start there. 13 00:01:05,240 --> 00:01:06,100 That's okay with everything else. 14 00:01:06,100 --> 00:01:12,080 Absolutely. I wasn't sure, you know, where you want to start off that. So I'm 15 00:01:14,440 --> 00:01:18,440 going to skip through some of my slides here and get us to. 16 00:01:26,250 --> 00:01:32,370 So unless it was just advising that we're going to have to go through this information all over again for the public hearing portion. 17 00:01:32,710 --> 00:01:35,050 Just prepare everybody. 18 00:01:36,390 --> 00:01:37,950 I'm going to hear me talk a lot tonight. 19 00:01:39,130 --> 00:01:42,090 So what we have before us is the petition for annexation. 20 00:01:42,290 --> 00:01:42,770 It's an application. 21 00:01:43,230 --> 00:01:45,050 It was complete and the fees were paid. 22 00:01:45,750 --> 00:01:51,350 The application was provided to the Board of Commissioners at their December 2024 meeting 23 00:01:51,350 --> 00:01:56,310 at which time they delegated it to you the planning commission, which is required by our code. 24 00:01:57,370 --> 00:01:58,530 The applicant is here tonight. 25 00:01:59,210 --> 00:02:04,270 A joining property owners have been notified by certified mail, advertisement in the Frederick 26 00:02:04,270 --> 00:02:06,910 Newspost and the property was posted. 27 00:02:11,260 --> 00:02:14,040 As previously stated, the petition for the 28 00:02:14,040 --> 00:02:18,180 Simmer's property along Apple's Church Road is sitting at the corner where 29 00:02:18,180 --> 00:02:23,920 Apple's Church Road and Roddy Road and Isla Road intersect. This is the same 30 00:02:23,920 --> 00:02:31,520 property that was the subject of the 2022 annexation resolution and then went to 31 00:02:31,520 --> 00:02:36,580 a referendum vote that was denied. Tonight planning and zoning commission wanted 32 00:02:36,580 --> 00:02:40,900 to discuss proposal as well as here is from town residents. 33 00:02:41,400 --> 00:02:43,620 The workshop portion allows the planning commission 34 00:02:43,620 --> 00:02:48,720 to discuss the petition in an open format with staff 35 00:02:48,720 --> 00:02:49,780 and the applicants. 36 00:02:50,800 --> 00:02:53,540 They will not be accepting public comment 37 00:02:53,540 --> 00:02:55,480 during the workshop portion of the meeting, 38 00:02:55,760 --> 00:02:58,740 but we'll be accepting comments during the public hearing 39 00:02:58,740 --> 00:03:00,660 and also at the end of the meeting, 40 00:03:00,660 --> 00:03:03,160 public comment will be heard on any item 41 00:03:03,160 --> 00:03:05,660 the plan or that you would like to address the planning commission. 42 00:03:05,660 --> 00:03:09,780 So, there will be plenty of opportunities for public comment tonight, just not during 43 00:03:09,780 --> 00:03:10,680 the workshop portion. 44 00:03:12,360 --> 00:03:17,080 Anxations are regulated by the state of Maryland's local government article. 45 00:03:17,480 --> 00:03:22,700 This article indicates that if a complete annexation petition application is submitted to 46 00:03:22,700 --> 00:03:28,280 the town, the town commissioners, they must review it and they cannot outright just deny it. 47 00:03:29,520 --> 00:03:35,280 The county code or the town's code, sorry, the town code regulates how annexations are processed, 48 00:03:35,280 --> 00:03:41,160 and this is located in Section 3.3 of the zoning ordinance. 49 00:03:41,940 --> 00:03:49,500 In the town code, the Board of Commissioners must delegate review of the petition to the Planning and Zoning Commission for their recommendation. 50 00:03:50,320 --> 00:04:00,560 The Planning and Zoning Commission is charged with developing a written recommendation to the Board of Commissioners and they serve in an advisory capacity to the Board of Commissioners. 51 00:04:00,560 --> 00:04:05,580 The Board of Commissioners holds a public hearing before making their decision. 52 00:04:06,600 --> 00:04:08,940 So again, there'll be more opportunities for public comment. 53 00:04:10,180 --> 00:04:13,760 They are the sole decision makers on annexation. 54 00:04:14,040 --> 00:04:16,640 The Planning Commission, again, just makes a recommendation. 55 00:04:17,500 --> 00:04:24,280 The Planning and Zoning Commission have several items they must report on to the Board of Commissioners. 56 00:04:24,280 --> 00:04:31,020 They shall make findings of fact on the degree of conformance to the Thermalt Master Plan in 57 00:04:31,020 --> 00:04:35,980 generally are generally and specifically in regards to the municipal growth element. 58 00:04:37,440 --> 00:04:43,260 The availability of public facilities and services to meet the demands proposed development, 59 00:04:44,500 --> 00:04:51,120 the viability and practicality of public improvement plans for utilities and services for the proposed 60 00:04:51,120 --> 00:04:51,620 development. 61 00:04:51,620 --> 00:04:58,420 They must also address if the annexation proposal should be approved or denied as any conditions 62 00:04:58,420 --> 00:05:02,440 that should be placed upon any approval if applicable. 63 00:05:03,620 --> 00:05:11,560 Review of the concept plan per the town code on concept plans which is located in 3.1.4 64 00:05:11,560 --> 00:05:15,060 of the zoning ordinance as well as proposed zoning district. 65 00:05:16,340 --> 00:05:26,280 How the annexation proposal impacts the planning and timing of infrastructure and what the zoning classification of the property should be upon annexation. 66 00:05:27,900 --> 00:05:33,560 The concept plan will be held to the regulations of concept plans in town codes. 67 00:05:36,790 --> 00:05:43,930 Thermal annexation process is unique in that it does require a detailed concept plan as you see here on the screen. 68 00:05:43,930 --> 00:05:49,210 concept plans associated with any project go through multiple reviews where 69 00:05:49,210 --> 00:05:54,110 recommendations are made applicant can address those review comments by 70 00:05:54,110 --> 00:05:59,710 providing a revised concept plan which they have done. This can create multiple 71 00:05:59,710 --> 00:06:06,110 versions of concept plans which is to be anticipated. However if an annexation 72 00:06:06,110 --> 00:06:11,370 concept plan gets to the board of commissioners for approval it is part of the 73 00:06:11,370 --> 00:06:17,990 annexation agreement. The concept plan is part of the binding agreement between the developer and 74 00:06:17,990 --> 00:06:23,550 the town of Vermont. As a matter of fact, if an annexation is approved, the application must 75 00:06:23,550 --> 00:06:29,470 or the applicant must still submit to the town to the Planning and Zoning Commission subdivision 76 00:06:29,470 --> 00:06:36,150 plaques and site plans that would still have to be reviewed by you. Any plan submitted must be 77 00:06:36,150 --> 00:06:41,070 in compliance with the approved annexation concept plans, so it can't just be willing 78 00:06:41,070 --> 00:06:46,230 nearly something completely different. It has to be compliant with the concept plan that's 79 00:06:46,230 --> 00:06:47,550 part of the annexation agreement. 80 00:06:50,610 --> 00:06:53,930 The property currently has a portion within town limits and a 81 00:06:53,930 --> 00:07:01,410 larger portion that is outside of town limits. The part within town limits is approximately 7.79 acres 82 00:07:01,410 --> 00:07:07,470 and is currently zoned R5 residential which allows for a maximum density of 83 00:07:07,470 --> 00:07:12,890 approximately 10 dwellings per acre. The larger part of the parcel is located 84 00:07:12,890 --> 00:07:18,870 outside of town municipal boundary but is directly attached to the town. This 85 00:07:18,870 --> 00:07:25,610 county portion of the parcel is over 16 acres in size and zoned agriculture. The 86 00:07:25,610 --> 00:07:31,190 proposed zoning for the property is R5 which is the zoning category recommended in 87 00:07:31,190 --> 00:07:37,730 the master plan which you can see up there on the map. It's underneath that blue star on the 88 00:07:37,730 --> 00:07:38,010 screen. 89 00:07:44,220 --> 00:07:50,020 Importantly regarding public adequate public facilities. A traffic impact study will be 90 00:07:50,020 --> 00:07:56,440 required and the applicant has acknowledged this and they do intend to do that. Water capacity is 91 00:07:56,440 --> 00:08:00,980 available. Certain upgrades will be needed and infrastructure obviously will be need to be extended 92 00:08:00,980 --> 00:08:06,800 it into the site to supply the development, which would be funded by the developer. 93 00:08:07,540 --> 00:08:09,120 Suer capacity is available. 94 00:08:10,540 --> 00:08:14,580 There is an existing pump station in the neighborhood, but that would have to be upgraded. 95 00:08:14,900 --> 00:08:18,680 And of course, infrastructure would have to be extended into the site by the developer. 96 00:08:20,780 --> 00:08:26,160 According to Frederick County Public School Systems, their quarterly report, as well as reports 97 00:08:26,160 --> 00:08:36,360 that they have provided there is adequate capacity in the school systems and they do anticipate 98 00:08:36,360 --> 00:08:43,820 the school systems to be within the school rated capacity ratios for the next 10 years. 99 00:08:45,200 --> 00:08:52,840 The electric services from the town are available and they will be served from Isla Road and required 100 00:08:52,840 --> 00:08:58,240 electric system upgrades and lines extended into the site, which would also be funded by the developer. 101 00:08:59,840 --> 00:09:05,480 Emergency services have provided comments, the planning commission has those, summary of those are 102 00:09:05,480 --> 00:09:10,820 in the staff report, and some of the items that they were concerned with were roadway with, 103 00:09:11,240 --> 00:09:17,640 no parking along the streets except where the parallel bump outs occur, full street width 104 00:09:17,640 --> 00:09:23,120 connection to Luther Drive. The assisted living facility will produce additional stress 105 00:09:23,120 --> 00:09:25,760 on the already stressed ambulance company. 106 00:09:30,010 --> 00:09:32,550 And then as previously stated, the property 107 00:09:32,550 --> 00:09:37,930 is within the growth area of the master plan and the proposed R5 zoning by the applicant 108 00:09:37,930 --> 00:09:42,430 is compliant with the master plan. So that is all that I have. 109 00:09:52,080 --> 00:09:58,080 Excuse me. Do we have any questions for staff at this time? 110 00:09:59,100 --> 00:09:59,620 No. 111 00:10:00,760 --> 00:10:04,120 Do we want to invite the applicant up so that we can interface with him? 112 00:10:05,600 --> 00:10:05,740 Yes. 113 00:10:06,160 --> 00:10:06,280 Okay. 114 00:10:07,580 --> 00:10:08,000 Mr. Cross. 115 00:10:14,130 --> 00:10:14,630 The workshop. 116 00:10:20,720 --> 00:10:21,440 Hi, Mr. Cross. 117 00:10:21,980 --> 00:10:22,220 Greetings. 118 00:10:22,480 --> 00:10:22,780 Good evening. 119 00:10:23,240 --> 00:10:23,820 Good evening. 120 00:10:23,820 --> 00:10:24,180 Good to be back. 121 00:10:26,260 --> 00:10:31,720 So I'll start off the question since we're a relatively new commission. 122 00:10:32,220 --> 00:10:38,900 If you could walk us through the process of your intergenerational housing and where this 123 00:10:38,900 --> 00:10:45,900 looks like elsewhere in the state that we could kind of look toward, you know, historical, 124 00:10:46,640 --> 00:10:52,620 you know, were there any issues with that? Like, because you have competing age groups, 125 00:10:52,620 --> 00:10:58,620 you know, collocated. So, has that been an issue in your other developments, or? 126 00:10:59,440 --> 00:11:06,560 I would use the word complementary rather than competing. But in response to your question, 127 00:11:06,560 --> 00:11:13,360 And my feeling is that neighborhoods that I was used to growing up that I've seen throughout 128 00:11:13,360 --> 00:11:18,380 the state used to be intergenerational, multi-generational. 129 00:11:18,660 --> 00:11:22,220 There was a time in America a grandmother could stick her nose out of the door and tell 130 00:11:22,220 --> 00:11:25,720 the teenagers to behave at three o'clock in the afternoon and not get shot at. 131 00:11:27,400 --> 00:11:34,960 There was a time when we didn't build age restricted age 55 communities candidly. 132 00:11:34,960 --> 00:11:41,680 I believe that's a move by the developers who don't want to pay an adequate public facility's audience to fix the schools. 133 00:11:42,200 --> 00:11:46,000 So if you do an age of 55 plus and you don't have kids, you don't have to make that contribution. 134 00:11:46,800 --> 00:11:47,940 I don't agree with that. 135 00:11:48,180 --> 00:11:51,460 I think if we're not fixing our schools, we're not gaining as a country. 136 00:11:52,240 --> 00:11:58,880 So my attitude in the development, we have approved in Smithburg and 137 00:11:58,880 --> 00:12:05,460 break ground on this summer is that you ought to have a mixture of housing in the same neighborhood, 138 00:12:06,880 --> 00:12:13,960 particularly in towns where there is a large commuting population. If the middle generation 139 00:12:13,960 --> 00:12:19,080 parents are down the road, and Joey and Sarah are going to get out of school at three, 140 00:12:19,700 --> 00:12:25,160 is there not an advantage of Joey and Sarah's grandparents living in the same neighborhood? 141 00:12:26,000 --> 00:12:32,440 and being that care provider until the bread-earning parents get back up the road near the end of the day. 142 00:12:32,880 --> 00:12:33,960 That's the concept. 143 00:12:34,560 --> 00:12:40,200 If you're in that middle-age group and you're looking over your shoulder-age parents, 144 00:12:40,580 --> 00:12:44,420 if they live in the same neighborhood and can age out in that neighborhood, 145 00:12:45,800 --> 00:12:47,780 I personally think that's a good idea. 146 00:12:48,400 --> 00:12:52,500 So that's our idea as far as intergenerational is concerned. 147 00:12:52,500 --> 00:12:54,160 Does that address your question, ma'am? 148 00:12:55,360 --> 00:12:56,120 Certainly, Chris. 149 00:12:56,980 --> 00:12:57,280 Sorry. 150 00:12:58,640 --> 00:12:59,080 You know me. 151 00:12:59,120 --> 00:12:59,740 I'm Bruce Dean. 152 00:12:59,880 --> 00:13:01,600 I'm Mr. Crosses, Landy's attorney. 153 00:13:02,340 --> 00:13:04,900 You would ask for a specific example that you could look at. 154 00:13:05,060 --> 00:13:09,700 Now, we worked on one in Frederick County called Ballinger Run. 155 00:13:10,300 --> 00:13:13,580 It's right across the street from Tuscware High School if you want to take a look at it. 156 00:13:14,500 --> 00:13:20,800 And it was not intended to be anything other than an all-age project. 157 00:13:21,400 --> 00:13:26,400 But then they, and I believe it was NVR Ryan Homes started building these villa products. 158 00:13:26,400 --> 00:13:33,360 They're very popular with folks who want to live on the first floor, folks 55 and older as Daniel explained. 159 00:13:33,680 --> 00:13:40,100 And we ended up actually changing a part of that project to be age restricted and not a large part of it. 160 00:13:40,600 --> 00:13:45,620 But for the reasons Daniel just explained, there were people who were moving to that neighborhood because 161 00:13:45,620 --> 00:13:48,520 is they wanted their kids to be able to walk 162 00:13:48,520 --> 00:13:49,700 to Tuscware High School, 163 00:13:50,060 --> 00:13:51,460 but then they also wanted their grandparents, 164 00:13:51,780 --> 00:13:53,960 the kids' grandparents to live in the same neighborhood. 165 00:13:54,700 --> 00:13:57,960 So it ended up being one of the fastest-selling projects 166 00:13:57,960 --> 00:13:58,940 in Frederick County. 167 00:13:59,320 --> 00:14:02,340 I mean, it went from starter construction to completion 168 00:14:02,340 --> 00:14:03,380 in just a matter of years, 169 00:14:03,380 --> 00:14:07,020 and it's significantly larger than Albert Metta's. 170 00:14:08,760 --> 00:14:09,820 Do you remember John? 171 00:14:09,980 --> 00:14:12,900 It's like, I wanna say it's like six or 700 houses, 172 00:14:12,900 --> 00:14:23,020 So it completely dwarfed this one, but I think the point is to Mr. Cross's point is that it has been done in Frederick and it was done very successfully. 173 00:14:24,100 --> 00:14:31,600 It is more typical that one single project will be all 55 and older and it might be next door to one that's up and everybody. 174 00:14:32,400 --> 00:14:35,500 But we found that mixing the two in one project actually worked really well. 175 00:14:35,500 --> 00:14:44,600 So he's not breaking brand new ground, but I would say he has a philosophy towards doing that that is not shared by all developers. 176 00:14:45,960 --> 00:14:47,500 And what about apartments? 177 00:14:48,600 --> 00:14:52,440 Because I don't know if you follow Frederick County and their housing assessments. 178 00:14:52,860 --> 00:14:59,320 There's zero inventory for seniors to rent in the county right now, according to their study. 179 00:15:00,000 --> 00:15:07,180 Why not? Look at that, you already have the assisted living facility there. Well, we had proposed 180 00:15:07,780 --> 00:15:14,120 multi-family in the prior iteration of the annexation that was approved by the Board of Commissioners, but then 181 00:15:15,260 --> 00:15:21,260 referendum to denial by the citizens of the town. For apartments? Oh yeah, there were apartments in our last 182 00:15:21,260 --> 00:15:28,880 in the last concept plan that was approved by the Board. And it was deemed, I disagreed with it, but 183 00:15:28,880 --> 00:15:33,140 the public spoke. They said it was too dense. There was too many units on that property, 184 00:15:33,720 --> 00:15:38,180 and a significant amount of them. Do you remember what the percentage was? It was multi-family. 185 00:15:38,300 --> 00:15:46,480 It was about 30%. But that was our argument. We were hoping to have a housing type for virtually 186 00:15:46,480 --> 00:15:51,740 every price point in the town of Thurmond, but we were told that was too dense. So when we came back 187 00:15:51,740 --> 00:15:53,460 in you don't see apartments anymore. 188 00:15:56,060 --> 00:16:02,880 We were told that by your voters. Your prior contract 189 00:16:03,590 --> 00:16:10,640 town planner very much encouraged us to proceed from kind of sort of what you're seeing now. 190 00:16:10,960 --> 00:16:19,780 Our first 2018 submittal was a mixture of singles, towns, and the senior living facility, 191 00:16:19,780 --> 00:16:24,680 and we were continually asked to increase our density in accordance with your plans. 192 00:16:25,260 --> 00:16:29,820 And we ultimately went to a condominium-style apartment building 193 00:16:29,820 --> 00:16:32,000 that had eight units per building. 194 00:16:32,600 --> 00:16:41,100 Ground floor senior independent living zero threshold household units with apartments above. 195 00:16:41,480 --> 00:16:45,380 That's what the voters made it very clear they didn't want in Thermite. 196 00:16:45,380 --> 00:16:52,200 So that's to answer your question. That's why we don't have them. We would love to have them. But okay, that's fair. 197 00:16:54,440 --> 00:16:54,880 Questions? 198 00:16:59,210 --> 00:17:03,990 Can you talk about the park of why you're combining them? 199 00:17:05,650 --> 00:17:09,610 You're improving the park that's already there, but you're not adding one, right? 200 00:17:10,530 --> 00:17:16,030 I'm sorry. The park. The park. Yeah, the park. You're you're using the existing park. 201 00:17:17,330 --> 00:17:23,230 that's on there no no it is not but it is the assisted living facility does 202 00:17:23,230 --> 00:17:29,350 directly but the to the park yeah they're in the middle I thought I was 203 00:17:29,350 --> 00:17:33,910 not in an previous plan where they were going to improve it correct in the 204 00:17:33,910 --> 00:17:38,910 previous annexation the agreement that was developed between the board of 205 00:17:38,910 --> 00:17:43,710 commissioners and the app it did include improvements to the Carroll Street 206 00:17:43,710 --> 00:17:45,110 extended park. Okay. 207 00:17:47,630 --> 00:17:50,610 So there's just a dog park and a small park for these 208 00:17:50,610 --> 00:17:55,210 assisted living. There's a lot of air in the middle. No, there's more than that. 209 00:17:55,350 --> 00:17:58,190 No. Yeah, yeah. Up here in the middle. It kind of looks like a couple. 210 00:18:01,720 --> 00:18:02,080 Playground 211 00:18:02,080 --> 00:18:05,420 and community gardens. Okay. I thought that was one that was already there. 212 00:18:08,360 --> 00:18:08,720 That's 213 00:18:08,720 --> 00:18:12,680 out in the middle. I was reminded that if I use a laser pointer on a TV screen, 214 00:18:12,680 --> 00:18:16,760 no one can see what I'm shooting at. So I'll use the traditional one. This is the 215 00:18:16,760 --> 00:18:24,740 primary playground area with parking and supporting it. This is the dog park exercise station 216 00:18:24,740 --> 00:18:30,320 spread out throughout the running nature trails throughout the area, victory gardens, another 217 00:18:30,320 --> 00:18:36,500 small playground. We've littered the community in opportunities to be outside and do exercise. 218 00:18:40,460 --> 00:18:48,520 And what are the impacts to Easy Street and Luther drive with the parking that they have now? 219 00:18:48,520 --> 00:18:51,140 Right now they obviously are they're both at a dead end. 220 00:18:51,600 --> 00:18:58,120 Do we have an understanding of what that will do to that community with the parking there? 221 00:18:58,760 --> 00:19:03,560 It's a public street so it currently allows parking. 222 00:19:04,880 --> 00:19:10,640 One of the things that emergency services did recommend that within this development that 223 00:19:10,960 --> 00:19:15,680 there would be no parking on the street except for within the areas that they have already 224 00:19:15,680 --> 00:19:22,680 designed as bump outs within the curb line. So that would not impede any 225 00:19:22,680 --> 00:19:27,740 emergency services accessing the site for emergencies. 226 00:19:28,980 --> 00:19:34,840 But beyond that, I can't forecast whether or not people are going to park on, you know, 227 00:19:35,120 --> 00:19:39,460 Luther Drive or Easy Street. I mean, I guess there's always that potential. 228 00:19:39,880 --> 00:19:43,540 But most likely they're going to park within their neighborhood because that will be closer. 229 00:19:43,540 --> 00:19:48,620 right but I'm saying like so for the existing neighborhood do those have the bomb 230 00:19:48,620 --> 00:19:52,440 bouts already there where do they know they do not they just have regular 231 00:19:52,440 --> 00:19:57,560 street sections that do allow for parking on the street so we wouldn't be 232 00:19:57,560 --> 00:20:02,800 impacting the no parking there it would be no no any anything that we're 233 00:20:02,800 --> 00:20:06,520 talking about or anything that we that you would recommend to the mayor's 234 00:20:06,520 --> 00:20:12,900 missioners would directly apply to this development and not to anywhere else 235 00:20:12,900 --> 00:20:14,000 within Fairmont. 236 00:20:26,620 --> 00:20:26,880 Indeed. 237 00:20:27,240 --> 00:20:28,520 Madam Chairman, may I make a comment? 238 00:20:28,860 --> 00:20:29,020 Sure. 239 00:20:29,220 --> 00:20:30,220 Because it fits with your question. 240 00:20:30,740 --> 00:20:30,840 All right. 241 00:20:31,000 --> 00:20:38,520 So when we appeared previously before you in January and before the commissioners prior to 242 00:20:38,520 --> 00:20:41,400 that, this was concept two, version one. 243 00:20:42,040 --> 00:20:48,860 What you're looking at in version two is we changed the road right away to 60 feet. 244 00:20:48,860 --> 00:20:55,460 We had heard Board of Commissioners meetings, by which apparently citizens and hammock 245 00:20:55,460 --> 00:20:57,740 rails feel their roads are too narrow. 246 00:20:59,080 --> 00:21:03,740 You haven't made an official change in your ordinance yet, so I'm jumping the gun, 247 00:21:04,120 --> 00:21:08,480 but anticipating that, the version two changes year to 60 foot right away. 248 00:21:08,880 --> 00:21:15,440 What I've just passed out to you is that new road cross section showing 12 feet six for 249 00:21:15,440 --> 00:21:23,240 for each of the traffic lanes and eight foot parallel parking on one side of the road and 250 00:21:23,240 --> 00:21:27,660 still the required street tree box and sidewalk area. 251 00:21:28,480 --> 00:21:33,520 And then on the side that doesn't have that parallel parking, that's a much larger 252 00:21:34,360 --> 00:21:41,740 13, 17 foot six open space with the street tree box and the sidewalk between the curb line 253 00:21:41,740 --> 00:21:42,860 in the end of the right away. 254 00:21:47,200 --> 00:21:52,880 And to your question, therefore, as far as the parks, I'm hoping we can get better utilization. 255 00:21:53,280 --> 00:21:57,860 If we're going to have that larger right away, picture, if you will, a serpentine sidewalk, 256 00:21:58,360 --> 00:22:02,880 a meandering sidewalk instead of a straight shot that has some of the exercise stations 257 00:22:02,880 --> 00:22:08,240 and more landscape planting as open space since it's going to be there. 258 00:22:08,240 --> 00:22:08,940 Can 259 00:22:13,870 --> 00:22:19,930 we talk about the intersections that interface with this development for a minute? 260 00:22:20,290 --> 00:22:22,470 Because that's a big concern for me. 261 00:22:22,610 --> 00:22:29,150 We have three roads that don't have markings on them, and one of the roads, I understand 262 00:22:29,150 --> 00:22:33,350 we don't have easements to widen the road the whole way through. 263 00:22:34,350 --> 00:22:38,970 So what is the recommendation and what is the plan to address that? 264 00:22:40,390 --> 00:22:45,810 Well, the applicant would have to do a traffic impact study, and that traffic impact study 265 00:22:45,810 --> 00:22:49,270 would make recommendations within that. 266 00:22:50,410 --> 00:22:56,930 But beyond that, I can't provide any additional information until we get that traffic impact 267 00:22:56,930 --> 00:23:05,190 study so that those engineers would figure out the logistics of all those things that need 268 00:23:05,190 --> 00:23:12,190 happen to make the road official safe, they would make recommendations, but they wouldn't 269 00:23:12,190 --> 00:23:18,650 engineer or design or anything like that. So typically, you know, they just wouldn't 270 00:23:19,130 --> 00:23:27,530 analyze, or existing traffic conditions, and then apply this development anticipated traffic 271 00:23:27,530 --> 00:23:34,570 counts, as well as existing approved plans that we have in the pipeline. So all of those 272 00:23:34,570 --> 00:23:37,290 Those would be calculated as well in those traffic counts. 273 00:23:37,970 --> 00:23:45,450 And then of course in that traffic impact study, they make recommendations as to what should be done to make the roads safer. 274 00:23:54,670 --> 00:24:02,270 Out of chairman, what I've handed you, staff has had for several years, but as part of the last go around, two traffic studies were done. 275 00:24:02,530 --> 00:24:05,450 We did one in 21 and one in 22. 276 00:24:05,910 --> 00:24:11,710 The second one was because of this citizen request that we missed the Thurmont rush hour. 277 00:24:11,710 --> 00:24:17,890 In fact, the Thermont Rush Hour is not the AM and PM rush hour, it's when NVR lets out. 278 00:24:18,430 --> 00:24:21,950 So the second study was done for that time of day. 279 00:24:22,670 --> 00:24:29,830 Further, the traffic engineer and staff, not me as developer, decided what intersections 280 00:24:29,830 --> 00:24:30,670 get studied. 281 00:24:31,670 --> 00:24:39,510 And I would point out that Marty Burns has, Commissioner Burns has repeated several times that there 282 00:24:39,510 --> 00:24:42,710 There should be a firewall between the developer and the traffic studies. 283 00:24:43,390 --> 00:24:49,570 Perfectly willing to support that idea, but they've been done twice, and there was public 284 00:24:49,570 --> 00:24:53,770 criticism last time around, oh, but you did your traffic studies during COVID. 285 00:24:54,610 --> 00:24:57,030 You obviously were low on your traffic counts. 286 00:24:57,690 --> 00:25:02,930 But as you'll see in the professional engineering comments, they anticipated that, so they looked 287 00:25:02,930 --> 00:25:07,410 at what the traffic counts were in the years prior to COVID, what your growth rates were, 288 00:25:07,410 --> 00:25:11,290 and they implied those growth rates on top of the study. 289 00:25:11,810 --> 00:25:15,270 So in essence, the second study was using what they estimated 290 00:25:15,270 --> 00:25:18,270 to be able to have been 2024 traffic. 291 00:25:19,970 --> 00:25:22,110 And you said which intersections were studied? 292 00:25:23,610 --> 00:25:24,090 Wow. 293 00:25:24,910 --> 00:25:25,570 A lot of them. 294 00:25:25,890 --> 00:25:29,450 So intersection at Apple's Church Road East Main Street, 295 00:25:29,570 --> 00:25:31,510 and these are the ones I remember off the top of my head, 296 00:25:31,510 --> 00:25:34,470 but everything is indicated in those traffic impact studies. 297 00:25:35,090 --> 00:25:41,130 Iowa Road, Roddy Road, Apple's Church Road intersection, Emmett'sburg Road, 298 00:25:41,290 --> 00:25:48,130 Iowa Road, Emmett'sburg Road, North Church Street, Water Street, North 299 00:25:48,130 --> 00:25:50,430 Church Street, East Main, West Main Street. 300 00:25:53,090 --> 00:25:54,870 Beyond that, right now I can't recall, 301 00:25:55,090 --> 00:25:58,810 but they're doing better than I could have done off the top of my head. I read the 302 00:25:58,810 --> 00:26:02,510 reports. Those are the ones that I know for certain that we did look at. 303 00:26:06,920 --> 00:26:07,060 Have 304 00:26:07,060 --> 00:26:11,000 have you have you actually set out there and watched the traffic let out at 305 00:26:11,000 --> 00:26:15,480 NBR yourself personally I have not okay well I would encourage you to do so so 306 00:26:15,480 --> 00:26:18,020 you can acclimate yourself with that area so maybe you could have a better 307 00:26:18,020 --> 00:26:21,020 understanding of what some of those concerns are from the citizens because it 308 00:26:21,020 --> 00:26:24,380 does there's a lot of traffic on that road when it lets out you can always tell 309 00:26:24,380 --> 00:26:29,220 when it's 230 because that's when the cars start rolling up and then you've got 310 00:26:29,220 --> 00:26:34,640 school letting out and then the construction on church street so I wouldn't you 311 00:26:34,640 --> 00:26:36,680 you know, dismiss some of those concerns that the citizens have. 312 00:26:36,840 --> 00:26:38,520 I think they're a very real concern. 313 00:26:39,160 --> 00:26:42,340 And we want to get away from being reactive with our intersections. 314 00:26:42,920 --> 00:26:46,040 We, my opinion, we haven't done the greatest job at looking 315 00:26:46,040 --> 00:26:50,960 at the intersections proactively, so we have a couple of problem areas 316 00:26:50,960 --> 00:26:52,460 and we don't want to create another problem. 317 00:26:53,000 --> 00:26:55,520 And these studies are done on average peak. 318 00:26:56,240 --> 00:27:03,840 So at 245, well, 1445, according to this study, you have 83 total cars 319 00:27:03,840 --> 00:27:10,940 is going down Apple's church road. When normally it's, what does it say here? Normally about 320 00:27:11,560 --> 00:27:19,640 30? It'll be very high peak time there. Yeah, I think that parking lot holds like 150 321 00:27:19,640 --> 00:27:26,880 cars, doesn't it? Something. I'd have to look and count. I don't know. Is it using a zero 322 00:27:26,880 --> 00:27:27,760 Yeah, 323 00:27:30,560 --> 00:27:39,860 that's, I mean, Isla Road is a very, it's an era road, it's not, I mean, we're adding 324 00:27:39,860 --> 00:27:44,360 a couple of developments that are going to be able to access that road in the next 325 00:27:44,360 --> 00:27:45,080 couple of years. 326 00:27:45,740 --> 00:27:51,260 You've got a regional park right there, you're encouraging park and open space, but there's 327 00:27:51,260 --> 00:27:53,360 no connectivity to the regional park. 328 00:27:53,360 --> 00:28:00,060 So that's, I think your proposed plan, it's going to, the sidewalks are going to go into town, but not that way, right? 329 00:28:00,740 --> 00:28:01,900 It's going to go this way. 330 00:28:02,040 --> 00:28:04,220 You mean with this concept that we have here, this way. 331 00:28:04,700 --> 00:28:10,680 Right now, everything just aligns with their frontage on Apple's church road, 332 00:28:10,940 --> 00:28:16,500 sidewalks on Apple's church road. Of course, they connect sidewalks to Easy Street and Luther Drive. 333 00:28:17,420 --> 00:28:22,580 So, but beyond that, there are no additional sidewalks at this time, and that's something that, you know, 334 00:28:22,580 --> 00:28:26,320 So in your recommendation to the Board of Commissioners, 335 00:28:26,460 --> 00:28:28,340 those are recommendations that you would make 336 00:28:28,340 --> 00:28:30,340 after you have all of your information. 337 00:28:30,600 --> 00:28:33,720 So after we get the traffic and impact study back, 338 00:28:34,200 --> 00:28:35,900 we look at that and review it. 339 00:28:36,020 --> 00:28:38,820 And then you can take that information and say, 340 00:28:39,000 --> 00:28:42,440 well, these are the things that we would like to see 341 00:28:42,440 --> 00:28:49,580 the developer make concessions to in the annexation agreement. 342 00:28:49,580 --> 00:28:57,740 The mayor commissioners may take those as their negotiating points in the annexation agreement. 343 00:28:58,360 --> 00:29:03,000 So anything that the planning commission feels will be a benefit to the community, you 344 00:29:03,000 --> 00:29:08,620 could make those recommendations in your report to the mayor and commissioners. 345 00:29:09,340 --> 00:29:09,560 Okay. 346 00:29:10,440 --> 00:29:15,680 So this pre-annexation agreement, that will be ultimately vetted through mayor and board. 347 00:29:16,260 --> 00:29:16,500 Correct. 348 00:29:16,500 --> 00:29:26,740 That is not under your purview, that is under the mayor commissioner's purview as the elected body they will negotiate with the applicant if they get to that point. 349 00:29:27,620 --> 00:29:33,540 But we can certainly include that in our resolution to them of what we think would be best in your recommendation. 350 00:29:33,960 --> 00:29:40,160 In your recommendation you can include any kind of concessions that you think would be a benefit to the community at large. 351 00:29:40,160 --> 00:29:41,520 Okay. 352 00:29:44,200 --> 00:29:52,220 Madam Chairman, if I understand your comment, one of Kelly's planters' comments in 353 00:29:52,220 --> 00:29:55,720 her January 21st document did pertain to sidewalks. 354 00:29:55,720 --> 00:29:59,920 And we now show in concept two, version two, aside- 355 00:30:00,000 --> 00:30:25,400 We have a sidewalk from where our Alpha Road exits on to Apple's Church going northerly to the intersection because we control that. But we don't control the front of the houses on Apple's Church Road today, so we don't show that there. And then obviously we have the sidewalks throughout our own community. And as specified, we're making the connection of Luther and the connection to DZ with the sidewalks. 356 00:30:33,080 --> 00:30:36,000 And then the design of the houses. 357 00:30:36,000 --> 00:30:41,760 Do you have any brickfront homes that you're proposing? 358 00:30:43,020 --> 00:30:47,480 Because I think when I look at the master plan and you talk about improving the roads 359 00:30:47,480 --> 00:30:53,480 and making them connected and all that good stuff, it's a little puzzling to me when 360 00:30:53,480 --> 00:30:56,980 you drive through one community that doesn't look anything like the next community that 361 00:30:56,980 --> 00:30:57,660 you're driving to. 362 00:30:57,880 --> 00:31:02,620 So I was just wondering from a developer standpoint, why wouldn't you want, you know, the houses 363 00:31:02,620 --> 00:31:11,220 This is a kind of have similar features like having some of the brick front that you see in some of our townhouse communities throughout their mind. 364 00:31:12,240 --> 00:31:16,040 So ordinarily, that decision happens later in the process. 365 00:31:16,820 --> 00:31:19,460 We look at this from a land development standpoint. 366 00:31:19,820 --> 00:31:23,300 Are we going to get through your process for an approved community? 367 00:31:23,780 --> 00:31:32,140 Then we work with builders and I will tell you that the number of national builders that have been touched with me over the last two weeks after. 368 00:31:32,140 --> 00:31:37,740 a couple of updates we posted is remarkable, given the appetite in the housing shortage. 369 00:31:38,060 --> 00:31:42,240 But we would then work with them for what types and styles of houses. 370 00:31:42,820 --> 00:31:47,020 In keeping with what recommendations you might make to us as you go through the process. 371 00:31:48,650 --> 00:31:50,540 Price points are critical. 372 00:31:51,080 --> 00:31:55,580 As I've said in my response, and Commissioner Burns said two months ago, 373 00:31:55,880 --> 00:32:00,300 you have a hundred single family homes in your pipeline and other developments. 374 00:32:00,300 --> 00:32:05,240 That's why I'm trying to do tan analysis, because I don't wish to compete with that other 100. 375 00:32:05,500 --> 00:32:13,180 And I believe we should provide citizens with the opportunity to climb on the ladder of home ownership at a price point somewhere below with single family home. 376 00:32:14,280 --> 00:32:29,160 I was mortified last June when we held our meeting at the library to have citizens say that if a person could not afford the $550,000 new DRB home in Hammaker Hills, they didn't want that person to move to thermo. 377 00:32:30,300 --> 00:32:35,960 I didn't know how to react to that, but I will take in mind your consideration that you'd 378 00:32:35,960 --> 00:32:39,700 like us to do some brick fronts and we'll try to work with the builders to see where those, 379 00:32:39,920 --> 00:32:41,760 where the price points would be if we did. 380 00:32:43,500 --> 00:32:46,260 550,000 dollar home, I couldn't even come closer to that. 381 00:32:48,500 --> 00:32:52,300 The last section of hammocker hills is going in the 590s at this point. 382 00:32:52,720 --> 00:32:52,720 It 383 00:32:59,760 --> 00:33:02,480 must be some DC people moving up to 70. 384 00:33:02,480 --> 00:33:03,480 So 385 00:33:06,590 --> 00:33:24,030 do you do you share the same concerns about the intersections you've been out there you know what we're talking about with three of the four roads having no markings on them and you're proposing to put in you know a complete development on you know 26 acres. 386 00:33:24,810 --> 00:33:31,490 I mean do you how do you feel about that and your culpability or I don't know. 387 00:33:31,490 --> 00:33:39,330 James, could you get the zip disk for the previous PowerPoint 3 from the traffic study available for Kelly, please? 388 00:33:40,650 --> 00:33:42,210 Okay, a couple of responses. 389 00:33:44,170 --> 00:33:53,270 It's a growth area that the town has identified certainly to your 2008 master plan, and I actually think much earlier than that. 390 00:33:53,270 --> 00:34:02,770 So I'm not the Johnny come lately, this has been what the town has said they want to grow as high density residential for years and years and years. 391 00:34:04,050 --> 00:34:15,330 As Kelly has pointed out, it's somewhere around 9.8 to 10 depending on how you read the documents on the desired with a maximum density in an R5 neighborhood. 392 00:34:15,710 --> 00:34:16,690 Got it roughly correct? 393 00:34:17,850 --> 00:34:24,270 We're coming in at 4.6, so we're less than half, respecting what we heard from the 394 00:34:24,270 --> 00:34:25,490 citizens last time around. 395 00:34:26,330 --> 00:34:33,910 But there is a limit when you're only doing 100 units instead of 177 units of will-the-deal 396 00:34:33,910 --> 00:34:40,290 pencil, if you tell me, I have to completely improve Apple Search Road or Carroll Street. 397 00:34:41,070 --> 00:34:43,790 I would suggest you that there is some sharing there. 398 00:34:43,790 --> 00:34:47,690 We're no longer bringing the majority of the houses to the area. 399 00:34:48,590 --> 00:34:53,930 In the traffic studies, yes, that one, if you've got it, plays electronically. 400 00:34:56,170 --> 00:35:02,830 I think the worst intersection it was identified previously was the even, and this was the 401 00:35:02,830 --> 00:35:05,970 first study, so this was not the PM Rush out of Ryan. 402 00:35:06,550 --> 00:35:12,510 The worst intersection was northbound on Apple's Church at the intersection with Carol. 403 00:35:12,510 --> 00:35:19,650 And I believe we're going to find a slide that one of the slides said before we would 404 00:35:19,650 --> 00:35:22,910 have done the 177 unit subdivision. 405 00:35:23,630 --> 00:35:30,590 But with everything else in your pipeline, what's called background in traffic engineering 406 00:35:30,590 --> 00:35:37,490 language, counted, that intersection was apparently an eight second delay on the evening rush. 407 00:35:37,490 --> 00:35:42,450 and on the 2021 study we were going to grow to a nine-second delay. 408 00:35:43,130 --> 00:35:44,650 So you'd have had an additional second. 409 00:35:45,230 --> 00:35:48,150 Now when we first saw some of these slides up once we got into the 22 study, 410 00:35:48,370 --> 00:35:50,050 I think those numbers began to grow. 411 00:35:50,430 --> 00:35:53,330 But they weren't growing by a significant amount. 412 00:35:54,290 --> 00:35:58,170 So two-year point, if working with the town, 413 00:35:58,350 --> 00:36:01,230 working with the town engineers and the traffic engineers, 414 00:36:01,650 --> 00:36:04,150 there's more that needs to be done at the intersections. 415 00:36:04,150 --> 00:36:09,690 happy to look at it. I personally really like the red stop sign with the LED 416 00:36:09,690 --> 00:36:13,870 squares around it on a solar panel. It gets your eyeballs and you stop at a 417 00:36:13,870 --> 00:36:16,990 stop sign and you do the same thing on the slow and the caution on the sidewalk 418 00:36:16,990 --> 00:36:23,350 ones. That's comparatively easy to do if the town is willing to have those in 419 00:36:23,350 --> 00:36:23,870 their municipality. 420 00:36:27,980 --> 00:36:33,200 What about exiting at Alfa Road? Do you have any, I mean you 421 00:36:33,200 --> 00:36:37,120 We talked about the Carroll Street one, but the end of Alpha Road is going to be terrible 422 00:36:37,120 --> 00:36:38,280 to try to make a left out of. 423 00:36:38,980 --> 00:36:39,700 Which answer? 424 00:36:40,020 --> 00:36:40,620 Wester East? 425 00:36:41,140 --> 00:36:42,100 I guess. 426 00:36:42,400 --> 00:36:43,160 Left side of this man. 427 00:36:43,460 --> 00:36:43,840 Left side? 428 00:36:44,020 --> 00:36:44,120 West? 429 00:36:44,720 --> 00:36:44,840 Okay. 430 00:36:45,460 --> 00:36:45,820 Yeah. 431 00:36:46,840 --> 00:36:51,020 So, if you try to make a left at the end of Alpha, I mean, I have a feeling that's going to be 432 00:36:51,020 --> 00:36:52,440 way more than a nine-sector right. 433 00:36:53,140 --> 00:36:54,200 Especially at 2.45. 434 00:36:55,080 --> 00:36:59,240 So, I mean, if they talked, I mean, would you put in stop signs there? 435 00:36:59,520 --> 00:37:00,880 Is there traffic light in the idea? 436 00:37:01,300 --> 00:37:02,640 Is there anything of that sort? 437 00:37:02,640 --> 00:37:09,000 I know we certainly have a stop sign, but I don't think I may I may have more stop signs on that will search 438 00:37:09,000 --> 00:37:11,680 Because I mean a stop sign there is obviously 439 00:37:18,600 --> 00:37:19,040 Good 440 00:37:21,730 --> 00:37:26,990 evening. My name is John Mazzell. I'm with Fox and associate Fox and associate the engineering record 441 00:37:26,990 --> 00:37:28,690 there will be a stop sign on 442 00:37:29,490 --> 00:37:30,790 the new leg 443 00:37:31,690 --> 00:37:33,630 at that intersection and 444 00:37:33,630 --> 00:37:40,030 the traffic study that's to be done would call out whether there is a warrant for a 445 00:37:40,030 --> 00:37:44,850 three-way stop sign or a signal that would be addressed in the traffic 446 00:37:44,850 --> 00:37:52,610 study and again the town can direct the traffic consultant in terms of what 447 00:37:52,610 --> 00:37:59,030 capture they want if it is part of that study to capture the NBR traffic just as 448 00:37:59,030 --> 00:38:01,410 was done in the 22 study. 449 00:38:18,470 --> 00:38:22,150 So, do you see the comment from the fire chief 450 00:38:22,150 --> 00:38:28,910 about having access to all sides of the assisted facility? 451 00:38:32,820 --> 00:38:34,540 He made a comment, a recommendation 452 00:38:34,540 --> 00:38:36,280 that he would ideally like to have access 453 00:38:36,280 --> 00:38:37,580 to all four sides, correct? 454 00:38:37,860 --> 00:38:38,520 Yeah, that is correct. 455 00:38:38,540 --> 00:38:40,280 He did say in an ideal world, 456 00:38:40,820 --> 00:38:45,260 access around four sides would be, you know, perfect. 457 00:38:45,260 --> 00:38:49,380 But he also realizes that that's not always feasible. 458 00:38:50,040 --> 00:38:55,040 So typically they like to have three or access around three sides. 459 00:38:55,300 --> 00:39:01,480 And that is something that we would address in detail at the site plan review for the assisted living facility. 460 00:39:02,760 --> 00:39:09,560 It's understood in the senior living industry that the residents typically cannot self evacuate. 461 00:39:09,560 --> 00:39:21,280 So all of your stairwells get built with large landings in their vicinity because once they make it to the stairway door or the staff gets in the stairway door, they're then in a fire sanctuary. 462 00:39:22,680 --> 00:39:26,600 This building is designed to tuck into the hillside. 463 00:39:26,600 --> 00:39:31,500 Grayson is below it on page right as you are looking. 464 00:39:32,520 --> 00:39:35,640 So we're trying to conceal the vertical mass of the building, 465 00:39:36,780 --> 00:39:39,520 respecting the residents in Albert courts today. 466 00:39:39,780 --> 00:39:42,920 So it presents on the uphill side as a one-story building. 467 00:39:44,060 --> 00:39:46,540 We'll have to work that from the get-around. 468 00:39:46,760 --> 00:39:47,660 It's going to be easy. 469 00:39:48,160 --> 00:39:52,360 You end up doing compacted gravel with grass over them, 470 00:39:52,360 --> 00:39:59,640 load bearing pathways for your fire apparatus to get around the side of the building without actually having full-scale roads. 471 00:40:00,000 --> 00:40:05,720 That'll be comparatively easy to do, page right even though we're doing, we are showing that as partial green space. 472 00:40:06,440 --> 00:40:09,480 And then you would be able to get in from the park side. 473 00:40:09,940 --> 00:40:14,380 So the vulnerability you're pointing out is behind the townhouses on the UC Street. 474 00:40:14,980 --> 00:40:20,280 But if we move north early, all we're doing is taking this larger building and 475 00:40:20,280 --> 00:40:22,180 and making it more visible to more people. 476 00:40:33,610 --> 00:40:35,510 So your traffic slides are up now. 477 00:40:35,750 --> 00:40:37,250 I apologize, it took me a minute to. 478 00:40:38,130 --> 00:40:39,910 Next slide, if you would, please. 479 00:40:40,410 --> 00:40:43,410 Let me call the date on that on the bottom right hand corner. 480 00:40:43,590 --> 00:40:45,910 This was a 30 August 2022 date. 481 00:40:46,270 --> 00:40:47,990 There is your list of the intersections 482 00:40:47,990 --> 00:40:51,750 that were studied as per the direction of planning and gym. 483 00:40:53,710 --> 00:40:56,510 And call the bold node out on the bottom. 484 00:40:57,330 --> 00:41:00,370 They did adjust to try to address 485 00:41:00,370 --> 00:41:06,690 the COVID change in world. Can we go next slide? I'm looking for the color 486 00:41:06,690 --> 00:41:12,870 graphic. So those are existing traffic volumes in May of 21 at North 487 00:41:12,870 --> 00:41:20,950 Carolyn Apple and at Roddy Eiler and Apple for evening weights. Let's go next 488 00:41:20,950 --> 00:41:21,630 slide. 489 00:41:23,910 --> 00:41:28,730 This would have been with all new communities that were in your 490 00:41:28,730 --> 00:41:33,210 pipeline at that time, add it in. That's your background 491 00:41:33,210 --> 00:41:37,090 training on top of your existing. And you can see the 492 00:41:37,090 --> 00:41:40,750 change there. And what I'm looking for is the next slide, 493 00:41:41,390 --> 00:41:46,850 which should add us, this was trip generation evening and 494 00:41:46,850 --> 00:41:53,510 morning rush for a 177 unit community. You're down at 100 495 00:41:53,510 --> 00:41:57,350 now. So these numbers don't match what's going on. 496 00:41:58,730 --> 00:42:04,890 you can see evening in and out and totals for both morning and evening and I'm still looking 497 00:42:04,890 --> 00:42:09,670 for next slide because I'm looking for the one that counts us. There we go. 498 00:42:11,990 --> 00:42:12,630 So, 499 00:42:14,570 --> 00:42:22,550 before we played 8 to 11 seconds AM and PM when we played 20 and 12. So we're adding four seconds 500 00:42:22,550 --> 00:42:27,890 in one case and in nine seconds and another at Carol and Apple's church. 501 00:42:28,710 --> 00:42:32,850 But, Madam Chairman, I hear you. I don't think you're just talking about traffic volume. 502 00:42:33,110 --> 00:42:37,390 I hear you talking about striping stop signs, go slows, cross walks. 503 00:42:38,690 --> 00:42:43,090 Ordinarily, again, we would deal with that with you at quote, preliminary plan stage. 504 00:42:43,450 --> 00:42:48,570 You approve the annexation, you approve the concept plan. We are back here to go through your full 505 00:42:48,570 --> 00:42:53,530 process, and that's, I believe, when that level of detail would ordinarily happen, Kelly. 506 00:42:53,750 --> 00:42:54,250 That is, John. 507 00:42:59,060 --> 00:43:00,860 So that's all I needed on the traffic study. 508 00:43:01,020 --> 00:43:03,040 So where was the nine seconds you were talking about? 509 00:43:03,100 --> 00:43:07,180 That was a bit in the 2021 study, and it would have predated this by a year. 510 00:43:07,260 --> 00:43:10,780 It was at the same intersection where we went from nine to eight. 511 00:43:11,240 --> 00:43:14,280 But when we did it the following year, the numbers got worse. 512 00:43:14,820 --> 00:43:19,800 So your AM went from 11 to a 20, you gained nine. 513 00:43:19,800 --> 00:43:25,920 this the PM went from an 8 to a 12 you gained 4 to basically double to say again 514 00:43:25,920 --> 00:43:27,240 basically doubled it yeah 515 00:43:30,410 --> 00:43:36,350 177 units yeah so when we update this it's gonna come back down 516 00:43:36,350 --> 00:43:41,290 we believe well when the traffic engineer updates it he'll come up with his own numbers 517 00:43:41,290 --> 00:43:50,710 exactly correct and also I just want to reiterate the fact that planning staff and 518 00:43:50,710 --> 00:43:55,810 And you all, as a planning commission, can make recommendations for intersection studies 519 00:43:55,810 --> 00:43:59,930 and different anomalies you would like them to take into consideration. 520 00:44:00,550 --> 00:44:06,730 So during this process, during this workshop, if there's something that you would like, 521 00:44:06,990 --> 00:44:12,290 you know, the traffic engineer to take into consideration, that's something that we need to 522 00:44:12,290 --> 00:44:18,450 start developing and making those list of items we want the traffic engineer to take into 523 00:44:18,450 --> 00:44:19,030 consideration. 524 00:44:19,030 --> 00:44:20,150 Madam 525 00:44:23,090 --> 00:44:28,030 Chairman, I see we got 15 minutes left in the workshop, so we're welcome to any 526 00:44:28,030 --> 00:44:28,610 other questions. 527 00:44:28,630 --> 00:44:33,290 What I've just handed you was one of the complaints we had last time was about vertical 528 00:44:33,290 --> 00:44:33,830 massing. 529 00:44:34,270 --> 00:44:41,090 Mind you, at that time we were doing four-story condominium apartment buildings, and although 530 00:44:41,090 --> 00:44:48,190 our height did not exceed the five condominium buildings in Albert courts today, I heard 531 00:44:48,190 --> 00:44:51,470 the citizens clearly say they didn't want that level of vertical massing. 532 00:44:52,090 --> 00:44:55,030 So this go around, part of what we did in Concept 2. 533 00:44:56,310 --> 00:44:59,950 Kelly, can we go back to the other... 534 00:45:00,000 --> 00:45:29,640 So it's hard copy with everyone for the benefit of anyone watching. Can we go back to the actual map, a concept two version two, please? One of the considerations we did this time was we moved the age 55 plus senior living villa townhouses, which is a really fancy word for a primary bedroom and primary bath on the ground floor. Build all the doorways as a three o'opening 535 00:45:29,640 --> 00:45:35,640 zero threshold into the bath, put all the blocking and walls, and let a senior age out 536 00:45:35,640 --> 00:45:36,160 in the home. 537 00:45:36,700 --> 00:45:40,240 It still has two guest bedrooms upstairs for visiting family or grandchildren. 538 00:45:40,920 --> 00:45:46,280 We put them up the hill because they are a two-story structure. 539 00:45:46,760 --> 00:45:52,400 So we wanted to reduce the vertical mass for our neighbors in Albert Courts. 540 00:45:52,840 --> 00:45:58,120 We put the three-story traditional townhouses at the bottom of the hill. 541 00:45:58,120 --> 00:46:06,020 So the cross section I've just given you is a slice through the community, roughly there, 542 00:46:06,740 --> 00:46:12,440 to show you how those roof lines, if you were looking at them from the side, starting 543 00:46:12,440 --> 00:46:18,700 with the Albert Court condominium building and going through us, what the vertical 544 00:46:18,700 --> 00:46:19,340 mass is. 545 00:46:19,740 --> 00:46:23,600 I at least wanted to get that one out since we had criticism on last time. 546 00:46:24,500 --> 00:46:26,520 But with 15 minutes to go, we're standing by. 547 00:46:26,520 --> 00:46:28,200 We can race through whatever you want to cover. 548 00:46:28,620 --> 00:46:35,180 And that is in our master plan of preserving the senior view in our communities. 549 00:46:35,680 --> 00:46:35,940 Absolutely. 550 00:46:36,580 --> 00:46:37,720 That is a good point to make. 551 00:46:40,120 --> 00:46:40,940 What else do you guys got? 552 00:46:43,620 --> 00:46:43,960 Questions? 553 00:46:45,740 --> 00:46:50,560 It's probably premature at this stage, but vegetation that you're looking at putting in. 554 00:46:50,920 --> 00:46:56,620 Will that grow up to be a block to the folks who are sitting at the top of it? 555 00:46:56,620 --> 00:46:57,220 They don't basically. 556 00:46:59,290 --> 00:47:01,210 I'm trying to interpret your question. 557 00:47:01,650 --> 00:47:04,470 Do you want vegetation or don't you want vegetation? 558 00:47:05,770 --> 00:47:07,650 That sounds like not super tall. 559 00:47:08,310 --> 00:47:09,470 That was the question, basically. 560 00:47:09,770 --> 00:47:10,650 You definitely want vegetation. 561 00:47:10,650 --> 00:47:12,490 The question is from a height standpoint. 562 00:47:12,990 --> 00:47:16,730 So your ordinance has a requirement for landscaping. 563 00:47:17,550 --> 00:47:19,310 And landscaping is planned. 564 00:47:19,670 --> 00:47:23,270 And John, I believe we are showing a minimum 10 foot buffer 565 00:47:24,050 --> 00:47:25,310 all around the property. 566 00:47:25,310 --> 00:47:33,070 Okay, okay, so we're possible we're running our nature running the nature trails are on the perimeter of the property also 567 00:47:33,710 --> 00:47:41,050 What I hear you saying is maybe on the back of these senior villas notice we didn't put the pathway there 568 00:47:41,910 --> 00:47:47,010 That's probably not where you want me putting Tuscan pines that grow 60 feet tall, right? 569 00:47:47,510 --> 00:47:48,790 Your point is taken 570 00:47:48,790 --> 00:47:56,370 Okay, yeah, again, back to what you were saying Craig that is something that we would work on during the site plan 571 00:47:56,370 --> 00:48:01,870 really process what kind of vegetation what kind of plan of buffer that we would want to see 572 00:48:01,870 --> 00:48:10,650 some and you know take into consideration public comment and that I remember that for previous discussions on other properties later in the game 573 00:48:10,650 --> 00:48:15,170 But I thought I'd just go ahead and ask now in case you know we're thinking about I just want to clarify that 574 00:48:23,240 --> 00:48:28,000 We're not taking public comment right now. We're just workshopping the Simmer's annexation petition. 575 00:48:30,810 --> 00:48:31,230 No? 576 00:48:36,950 --> 00:48:40,770 Questions from my engineer on stormwater or other issues. 577 00:48:42,170 --> 00:48:44,870 If you want to touch on the stormwater management, that would be great. 578 00:48:55,000 --> 00:48:57,500 Again, John Mazzell and the Fox and Associates. 579 00:48:57,960 --> 00:49:03,260 Now generally our stormwater management has to meet the state of Maryland stormwater. 580 00:49:04,440 --> 00:49:10,060 ordinance and the Fredrick County ordinance. They are the authority, the approval authority, and 581 00:49:10,060 --> 00:49:16,280 inspection authority in Fredrick County. So, our stormwater will have to meet that criteria. 582 00:49:16,420 --> 00:49:22,020 What is shown on this plan is a conceptual stormwater management plan. The small areas 583 00:49:22,020 --> 00:49:29,480 that you see scattered out are called ESDs, environmentally sensitive design facilities that are with 584 00:49:29,480 --> 00:49:34,920 they call bioreattention facilities, there's a whole gamut of things that will be utilized when 585 00:49:34,920 --> 00:49:42,380 we do this design, what they call rooftop disconnects, non-root top disconnects, bioreattention 586 00:49:42,380 --> 00:49:46,700 facilities, you name it, to meet our requirement. 587 00:49:47,320 --> 00:49:53,280 It's the coin at ESD to the maximum extent practicable. 588 00:49:53,280 --> 00:50:00,380 So, we are put under a microscope to provide stormwater management to meet that. 589 00:50:01,000 --> 00:50:08,440 So, this is a concept those may ultimately when we get into the final design and get 590 00:50:08,440 --> 00:50:13,960 into the weeds on this, those facilities may move around, they might amoeba in size. 591 00:50:15,260 --> 00:50:20,780 A lot of things go into that, degrading of the site, how the water is going to move, how 592 00:50:20,780 --> 00:50:26,560 we integrate it, but this just gives you a very high-level look at what stormwater management 593 00:50:26,560 --> 00:50:34,440 is going to do. Generally, when we're done, the code says that if you provide ESD to the 594 00:50:34,440 --> 00:50:41,660 maximum extent practical, this site will function as a wooded site in a post-developed condition 595 00:50:41,660 --> 00:50:43,080 when it's all built. 596 00:50:45,500 --> 00:50:47,240 That's kind of it in a nutshell, 597 00:50:49,820 --> 00:50:51,520 but that's a pretty rigorous 598 00:50:51,520 --> 00:50:57,380 review. I believe the town consultant reviews it as well. So there's a lot of eyes on it. 599 00:51:04,130 --> 00:51:12,620 If I read it correctly, I know this is preliminary. At the base of the picture looks like it's your 600 00:51:13,400 --> 00:51:19,560 upper level if you will water capture and it runs underground down to the big sort of 601 00:51:19,560 --> 00:51:22,500 There's like shape down at the, at the time. 602 00:51:23,220 --> 00:51:26,480 Where does it go after that, or is it just retained there? 603 00:51:26,860 --> 00:51:27,460 Is it retained there? 604 00:51:27,540 --> 00:51:31,720 Well, this is just, this will be what we call an engineered channel. 605 00:51:32,000 --> 00:51:32,220 Okay. 606 00:51:32,980 --> 00:51:35,340 That will convey water through the site. 607 00:51:35,680 --> 00:51:36,660 Excuse me, John. 608 00:51:37,020 --> 00:51:41,280 Can you take that mic with you so that everybody can hear, please? 609 00:51:42,320 --> 00:51:46,560 The engineered channel will convey water safely through the site. 610 00:51:46,560 --> 00:51:52,980 It will bypass this large facility, go around it to where it discharges. 611 00:51:55,380 --> 00:52:04,100 So we describe this as an engineer channel, we will route it and design it based on the flow that's in it. 612 00:52:04,340 --> 00:52:13,220 We will have to demonstrate that it's designed according to the flow that's in it and that it is stabilized. 613 00:52:13,220 --> 00:52:20,680 In a post-developed, excuse me, condition, there will be culverts underneath of the proposed 614 00:52:20,680 --> 00:52:23,620 roadways in these locations. 615 00:52:24,720 --> 00:52:26,680 Where does it go once it leaves the property? 616 00:52:28,280 --> 00:52:31,600 Currently, it comes down to Apple's Church. 617 00:52:31,740 --> 00:52:38,000 There is a culvert that's here that really controls the entire site because we will likely have 618 00:52:38,000 --> 00:52:39,500 to improve that culvert. 619 00:52:40,980 --> 00:52:48,240 But the site will be controlled to the extent that we can put water through and over the road. 620 00:52:48,240 --> 00:52:53,640 The county has a requirement that I think in a 100 year storm event, depending on the classification of the road, 621 00:52:53,780 --> 00:52:58,800 you may be able to put as much as 8 inches of water over the roadway in a 100 year storm. 622 00:52:59,180 --> 00:53:04,760 Again, we have to meet their criteria, they're going to review that, we have to meet their criteria. 623 00:53:04,760 --> 00:53:04,880 Yeah. 624 00:53:05,260 --> 00:53:05,560 Okay. 625 00:53:06,100 --> 00:53:13,200 So, John, can you further clarify that larger storm water management facility, that is going 626 00:53:13,200 --> 00:53:18,680 to control the water, the storm water runoff for the development, though, correct? 627 00:53:18,900 --> 00:53:19,080 That's correct. 628 00:53:19,080 --> 00:53:25,260 So, right now, what you were speaking to is existing storm water runoff that is running 629 00:53:25,260 --> 00:53:33,540 to a facility and would not go to the larger facility for the development that the applicant 630 00:53:33,540 --> 00:53:34,160 is planning. 631 00:53:34,160 --> 00:53:46,760 That's correct, all of the proposed, the water that comes off of the proposed condition will be conveyed through storm drain systems to this larger facility. 632 00:53:47,080 --> 00:54:04,140 So you're taking water from the impervious surfaces, rooftops, running them through these small ESDs that then get connected to a storm drain system that is conveyed down to the large overall facility to provide quantity management. 633 00:54:04,140 --> 00:54:16,040 It's a combination of all the different practices that get some slight attenuation and control in the small ESDs. 634 00:54:16,060 --> 00:54:22,320 They're mainly designed for say the one-year storm event, your typical storm events. 635 00:54:22,600 --> 00:54:27,620 That's where most of the pollutants are when they're washed off of the impervious areas. 636 00:54:28,020 --> 00:54:31,680 But this is where all the quantity controlled will occur. 637 00:54:31,680 --> 00:54:32,040 I 638 00:54:38,540 --> 00:54:46,000 think for the sake of time, we should probably wrap up our workshop here, Mr. Cross. 639 00:54:48,730 --> 00:54:51,560 My team's avoiding the 800 pound gorilla in the corner. 640 00:54:52,760 --> 00:54:56,960 What John Stess described is what happens for Albert Meadows. 641 00:54:57,880 --> 00:55:04,540 ESD, the MEP and the bioswales spread out around the community going to the pond at the bottom 642 00:55:04,540 --> 00:55:11,380 of the hill which provides us the quantity we need and then feeds across the street. And 643 00:55:11,380 --> 00:55:19,360 sir, there is a blue line stream buried in the woods on page top that that water eventually 644 00:55:19,360 --> 00:55:28,560 goes to. Okay, the 800 pound gorilla is Albert courts. And what is shown on page bottom on the plans 645 00:55:28,560 --> 00:55:37,180 you are looking at is a possibility, a proposal, for a stormwater facility that the county has 646 00:55:37,180 --> 00:55:48,360 said they would allow to be built to 1996 standards, not ESD, the MEP, to accommodate the stormwater 647 00:55:48,360 --> 00:55:54,760 coming off the nine acres that is an Albert courts today. And then that water would be conveyed through 648 00:55:54,760 --> 00:56:02,900 our site down and around. That is an option for discussion by all the parties in the month's 649 00:56:02,900 --> 00:56:03,020 set. 650 00:56:04,180 --> 00:56:08,780 Yeah, and I think they'll be followed since we have a couple of minutes left. We might have some 651 00:56:08,780 --> 00:56:12,160 follow-up questions to that during the public hearing before we take public comment on that. 652 00:56:12,580 --> 00:56:12,780 I understood. 653 00:56:13,020 --> 00:56:13,540 Okay with it. 654 00:56:13,740 --> 00:56:14,040 Understood. 655 00:56:14,480 --> 00:56:14,800 Okay. 656 00:56:15,260 --> 00:56:15,620 Thank you. 657 00:56:16,140 --> 00:56:16,700 Thank you. 658 00:56:17,360 --> 00:56:22,260 Any last calls before I take a motion to close the workshop? 659 00:56:23,980 --> 00:56:25,380 She's making those things with the wheelchair. 660 00:56:26,160 --> 00:56:26,700 Don't fool her. 661 00:56:26,820 --> 00:56:27,580 Yeah, she's having fun. 662 00:56:30,800 --> 00:56:32,380 She's not having fun. 663 00:56:32,380 --> 00:56:32,920 That's all right. 664 00:56:33,660 --> 00:56:33,940 Sure. 665 00:56:35,980 --> 00:56:37,420 Here's the motion to close the wheelchair. 666 00:56:38,360 --> 00:56:39,300 So I have a second. 667 00:56:39,540 --> 00:56:39,820 Second. 668 00:56:40,200 --> 00:56:41,980 All those in favor, please raise your right hand. 669 00:56:42,560 --> 00:56:43,300 Thank you. 670 00:56:43,940 --> 00:56:45,000 Workshop is adjourned. 671 00:56:46,480 --> 00:56:48,440 Let me try to use the little ghost bathroom real quick. 672 00:56:51,310 --> 00:56:52,190 Quick recess. 673 00:56:52,190 --> 00:56:52,430 Yes. 674 00:57:41,330 --> 00:57:51,810 Good evening. Welcome to the March planning and zoning regular meeting today is Thursday, March 27th. 675 00:57:53,760 --> 00:57:58,120 The first item on the agenda is the zoning inspectors report. Kelly? 676 00:57:58,900 --> 00:58:08,120 Okay. So since our last meeting in February, we issued 19 zoning certificates, three work for 677 00:58:08,120 --> 00:58:16,800 For new residential dwellings, 11 were for residential accessory uses, 4 were for commercial 678 00:58:16,800 --> 00:58:21,580 accessory uses, and 1 was a no zoning required certificate. 679 00:58:22,240 --> 00:58:27,500 So far this year we have issued 34 zoning certificates, and last year at this time it was 680 00:58:27,500 --> 00:58:28,020 45. 681 00:58:30,940 --> 00:58:31,480 Thank you Kelly. 682 00:58:31,920 --> 00:58:33,420 Anybody have any questions for Kelly? 683 00:58:41,640 --> 00:58:47,320 All right, the next two items, I'm going to go ahead before we get into the weeds and 684 00:58:47,320 --> 00:58:50,840 And go ahead and swear anybody in that would like to give testimony tonight. 685 00:58:52,880 --> 00:58:55,080 Please leave, raise your right hand and stand. 686 00:58:59,840 --> 00:59:10,460 Do you solemnly swear or affirm that the response is given and statements made in this hearing before the planning and planning and zoning commission will be the whole truth and nothing but the truth if so answer I do. 687 00:59:10,680 --> 00:59:11,240 I do. 688 00:59:11,660 --> 00:59:12,040 Thank you. 689 00:59:13,900 --> 00:59:14,740 Point of order. 690 00:59:15,500 --> 00:59:18,680 We do have a couple of seats up here folks if you want to fill in. 691 00:59:18,680 --> 00:59:25,120 When you do come to the podium, please state your name if you are a resident and if you've 692 00:59:25,700 --> 00:59:26,900 been sworn in. 693 00:59:32,760 --> 00:59:33,020 All right. 694 00:59:33,100 --> 00:59:42,260 Next item on the agenda is discussion and action on the preliminary plan C1-PP-2025-01 695 00:59:42,840 --> 00:59:48,820 Mountain Gate Business Park, Thermalt Business Park, Axis Road, situated east of Goodwill. 696 00:59:51,620 --> 00:59:59,860 Alright, so tonight we have the preliminary plan which is the next step in the site plan 697 01:00:00,000 --> 01:00:07,600 Review process. The applicant is here, adjoining our, adjoining property owners were notified by certified mail and the site was posted. 698 01:00:08,160 --> 01:00:08,280 The 699 01:00:10,550 --> 01:00:18,890 preliminary site plan before you tonight is for the property owned by Mountain Gate Business Park. The engineering firm for the applicant is be in our design group of Frederick. 700 01:00:19,650 --> 01:00:31,470 The property consists of two parcels. One parcel is where Goodwill was constructed. And the other parcel is the over 18 acres and size. 701 01:00:31,470 --> 01:00:34,270 and is outlined on the screen in yellow. 702 01:00:35,090 --> 01:00:38,770 This large parcel consists of a platted road connection 703 01:00:38,770 --> 01:00:40,350 to Thermont Boulevard. 704 01:00:40,730 --> 01:00:43,690 Parcel includes a forest retention ordinance area 705 01:00:43,690 --> 01:00:47,610 that is highlighted in green and consists of about seven acres. 706 01:00:48,550 --> 01:00:50,690 The area in red is the area that parcel 707 01:00:50,690 --> 01:00:52,910 that is vacant without forest easement 708 01:00:53,650 --> 01:00:55,530 and has commercial zoning. 709 01:00:56,190 --> 01:00:58,850 The area in orange has been before the Planning and Zoning 710 01:00:58,850 --> 01:01:02,470 commission previously for a townhouse community in the R5 711 01:01:02,470 --> 01:01:07,230 zoning district. The non-highlighted area is the electric line 712 01:01:07,230 --> 01:01:11,750 easement for the for Thermont and Potomac Addison. There's 713 01:01:11,750 --> 01:01:16,130 power lines running through there. The zoning designation of 714 01:01:16,130 --> 01:01:20,630 the property in the area is general business. The property is 715 01:01:20,630 --> 01:01:24,610 connected to Thermont Boulevard and sits directly adjacent to 716 01:01:24,610 --> 01:01:28,410 the Goodwill site. The applicants intent with the access 717 01:01:28,410 --> 01:01:35,230 road is to create a roadway to the property that is zone general business and is undeveloped 718 01:01:35,230 --> 01:01:39,690 and it's located to the rear of the Sonoco gas station on Frederick Road. 719 01:01:40,530 --> 01:01:46,710 The site area included in the access road is slightly more than an acre in size and it 720 01:01:46,710 --> 01:01:48,430 is zone general business. 721 01:01:50,920 --> 01:01:56,820 The preliminary plan for the access road proposes the development of a site, or the process 722 01:01:56,820 --> 01:02:02,280 a site plan for the access road that will simultaneously amend the Goodwill site plan to create 723 01:02:02,280 --> 01:02:08,640 direct connection to the Goodwill parking lot while creating access to the commercial zone 724 01:02:08,640 --> 01:02:16,020 property that does not currently have road access. The proposed access road intentionally does not 725 01:02:16,020 --> 01:02:23,420 follow the platted location for the road due to the impact of wetlands. As platted it would 726 01:02:23,420 --> 01:02:33,360 disturb approximately 15,500 square feet, but as with the revised route, it would only 727 01:02:33,360 --> 01:02:38,920 disturb about 1800 square feet. So that is a significant reduction in wetland impact. 728 01:02:39,840 --> 01:02:46,340 The road location was shifted towards Goodwill or Northwest to, again, greatly reduce 729 01:02:46,340 --> 01:02:52,260 those wetland impacts. The proposed roadway path will still impact wetlands, but again, 730 01:02:52,260 --> 01:03:00,580 it is greatly reduced. And it is the path that was recommended or it was recommended by MDE to 731 01:03:00,580 --> 01:03:09,040 reduce wetlands impact to the greatest degree possible, which again the applicant did follow their advice. 732 01:03:14,220 --> 01:03:21,220 Here again is an aerial. I just, you know, I get a lot of questions where exactly this is located at. 733 01:03:21,900 --> 01:03:24,180 So, again, here's the area of the site. 734 01:03:24,680 --> 01:03:28,540 We can see approximately the access road location 735 01:03:28,540 --> 01:03:30,680 in relation to things that we know. 736 01:03:31,320 --> 01:03:32,960 Of course, this is just my sketch, 737 01:03:32,960 --> 01:03:35,900 so it's not eloquent or to scale, 738 01:03:36,200 --> 01:03:37,960 but it does give us the general idea 739 01:03:37,960 --> 01:03:39,860 of the location of the access road, 740 01:03:40,260 --> 01:03:44,400 which is the purple amoeba up there on the screen, 741 01:03:44,880 --> 01:03:47,240 and it does connect to Thermot Boulevard. 742 01:03:47,800 --> 01:03:50,160 Again, the area outlined in yellow 743 01:03:50,160 --> 01:03:55,000 is owned by the applicants the area the area shaded in red is zone general 744 01:03:55,000 --> 01:04:02,020 business which is why they're building this access road to gain access. The 745 01:04:02,020 --> 01:04:07,660 green area is in a permanent force retention ordinance easements and the 746 01:04:07,660 --> 01:04:15,780 area in orange is the R5 zoning district which has been before you previously. The 747 01:04:15,780 --> 01:04:23,400 The town-owned passive park is the pie-shaped parcel, adjoining the green area, and some additional 748 01:04:23,400 --> 01:04:30,000 landmarks you can see on the screen there, the Y's location, the Sonoco gas station, Fair 749 01:04:30,000 --> 01:04:36,020 Oaks community, and the library, which is kind of cut off on the screen there, but that's 750 01:04:36,020 --> 01:04:37,600 the location of the library as well. 751 01:04:42,530 --> 01:04:48,130 Existing conditions, a portion of the proposed road is on the Goodwill site and the remainder 752 01:04:48,130 --> 01:04:54,450 is on vacant unimproved land. Proposed site plan would amend the Goodwill site plan by adding 753 01:04:54,450 --> 01:05:00,850 direct access to the southeast side of the construction, well no longer the constructed site, as well 754 01:05:00,850 --> 01:05:07,210 as adjusting the storm water management facilities to accommodate the roadway. The access road is 755 01:05:07,210 --> 01:05:14,170 proposed to be 30 foot wide paid roadway and is engineered or designed to accommodate tractor trailers 756 01:05:14,170 --> 01:05:18,210 and other vehicles on the roadway. 757 01:05:18,510 --> 01:05:25,150 The roadway appears to be able to accommodate truck traffic, but it would be good to have 758 01:05:25,150 --> 01:05:29,710 the applicants, engineer provide us at least on one of the plan sheets or provide a new 759 01:05:29,710 --> 01:05:36,190 plan sheet showing truck turning of movements just to ensure that indeed the 18 lillers can 760 01:05:36,190 --> 01:05:37,990 navigate the proposed roadway. 761 01:05:39,730 --> 01:05:48,370 Sidewalks are provided along the road, but they are not all shown in the same grades or the grade scale gradient on the plan. 762 01:05:49,730 --> 01:06:06,450 There is also wording on the plan that states the future sidewalk, which staff is recommending that it be changed to remove the word future to ensure that sidewalks are constructed simultaneously with the road. 763 01:06:07,530 --> 01:06:12,810 The proposed site plan is showing some grading on the town property. 764 01:06:13,850 --> 01:06:18,630 So of course the applicant must obtain permission and a temporary construction easement from 765 01:06:18,630 --> 01:06:19,790 the board of commissioners. 766 01:06:22,440 --> 01:06:26,620 The applicant will not be installing any utilities with the access road. 767 01:06:26,820 --> 01:06:31,280 They have an access easement already to the site that will allow them to take utilities 768 01:06:31,280 --> 01:06:31,860 that way. 769 01:06:31,860 --> 01:06:38,460 So we don't have to worry about utility installation with the construction of the road. 770 01:06:40,740 --> 01:06:45,820 Maryland Department of Environment permits are required due to the presence of wetlands 771 01:06:45,820 --> 01:06:51,300 and the property owner and staff met with MDE on site who indicated that reducing wetland 772 01:06:51,300 --> 01:06:58,580 impacts to the greatest degree possible would be a preferred path while the town is also maintaining 773 01:06:58,580 --> 01:07:05,100 the need to have a square road intersection at that point. 774 01:07:06,440 --> 01:07:11,540 Stormwater and erosion and sediment control will need to be obtained, our approvals will 775 01:07:11,540 --> 01:07:16,060 need to be obtained from Frederick County and they do all the review and approval of those 776 01:07:16,060 --> 01:07:16,520 plans. 777 01:07:18,280 --> 01:07:26,100 The access road will be private, but it will provide access to sites, the goodwill site 778 01:07:26,100 --> 01:07:29,240 as well as this commercialized own portion of property. 779 01:07:30,240 --> 01:07:35,040 So it is important that an access and maintenance agreement be submitted 780 01:07:35,040 --> 01:07:39,500 to the town so that Leslie, our town attorney, can review it to make sure 781 01:07:39,500 --> 01:07:45,660 that each property owner is fairly responsible for maintenance of that road. 782 01:07:46,620 --> 01:07:50,500 And of course, the agreement does need to be recorded in land records 783 01:07:50,500 --> 01:07:54,280 and that reporting information provided to town staff so we can ensure that 784 01:07:54,280 --> 01:08:01,860 that does occur. So staff does recommend conditional approval of the 785 01:08:01,860 --> 01:08:07,440 preliminary site plan and staff did make eight 786 01:08:10,120 --> 01:08:13,240 plus recommended recommended 787 01:08:13,240 --> 01:08:19,520 conditions of approval but most of them are standard items. The applicant must 788 01:08:19,520 --> 01:08:24,440 obtain their MDE permit approval. The applicant must obtain Frederick County 789 01:08:24,440 --> 01:08:30,120 approval for storm water management and for erosion and sediment control. That all sidewalks 790 01:08:30,120 --> 01:08:38,040 should be shown on the site plan in the same gray scale, gradients, and future removed from any 791 01:08:38,040 --> 01:08:43,900 sidewalk indication that the sidewalk must be constructed with the road construction. A temporary 792 01:08:43,900 --> 01:08:49,760 construction easement must be obtained from the Board of Commissioners. An access and maintenance 793 01:08:49,760 --> 01:09:02,580 This is an incident agreement should be provided to the town and the town attorney review it to make sure that each property owner's property owner is fairly responsible for their maintenance of that roadway. 794 01:09:04,520 --> 01:09:16,480 Also asking the applicant to have their engineer provide on one of the plan sheets or separate plan sheet just indicating that those tractor trailer maneuvers can be made on that roadway safely. 795 01:09:17,160 --> 01:09:24,260 And then, of course, we have three minor edits, which are the north arrow on the site plan, 796 01:09:25,620 --> 01:09:33,820 having on sheet 7 and 8, the seal and signature of the engineers applied to the site plan on 797 01:09:34,220 --> 01:09:43,060 page 7 and 8, and then also on sheet 2, we need the appropriate town signature blocks, which 798 01:09:43,060 --> 01:09:45,820 is missing from that plan sheet, but it's on all the other ones. 799 01:09:47,340 --> 01:09:48,020 So, I'll have. 800 01:09:48,660 --> 01:09:49,800 Thanks, and the applicant is here. 801 01:09:52,080 --> 01:09:52,820 Questions for Kelly? 802 01:09:54,380 --> 01:09:55,620 Let us know, to be there. 803 01:09:55,960 --> 01:10:02,480 I have one before we bring out the applicant, so I had asked somebody from MD to be able to 804 01:10:02,480 --> 01:10:06,740 be here again, you kindly responded, you know, that they're on their own working schedule. 805 01:10:07,420 --> 01:10:12,940 So I did contact MD to try to understand, like, you know, the meanings and the process 806 01:10:12,940 --> 01:10:14,400 for what they're looking at. 807 01:10:15,080 --> 01:10:17,660 So I just want to make sure when you guys met with MBE, 808 01:10:18,760 --> 01:10:26,560 the gentleman that I spoke with said that the future development of the site would be of concern to MBE, 809 01:10:27,300 --> 01:10:29,200 because the wetlands are being disturbed. 810 01:10:30,060 --> 01:10:32,880 They would like to understand the scope of that. 811 01:10:33,900 --> 01:10:38,160 And then also just to ensure that they're looking at all the options, 812 01:10:38,500 --> 01:10:41,220 there was an option to come off of the main road. 813 01:10:41,220 --> 01:10:51,700 and the applicant is choosing to come off of this particular site they direct they said that they would like to know that as well when they're getting their permit. 814 01:10:52,240 --> 01:11:01,760 So I just want to make sure as I understand it that's actually what's happening behind the scenes to be as openly because I know people have been concerned about the wetlands. 815 01:11:02,280 --> 01:11:08,220 And I know that it's just a minus fuel amount but I think that the gentleman told me that there's a 35 foot buffer. 816 01:11:08,220 --> 01:11:13,600 So, you know, the concern is this area is right off the 15. There's a lot of run-off. 817 01:11:13,760 --> 01:11:16,240 There's a lot of impervious surface already coming through there. 818 01:11:16,520 --> 01:11:21,120 So those trees kind of act as a, you know, the first point of protection 819 01:11:21,120 --> 01:11:26,940 and before it gets all the way back there into a very marshy area, subsequently feeding the, 820 01:11:26,940 --> 01:11:30,600 I think it's hunting. Is it hunting creek that's back there? 821 01:11:31,500 --> 01:11:34,840 Which, you know, people are like, oh, we have our, we already have a water issue here, 822 01:11:34,840 --> 01:11:40,980 you know, just trying to do our diligence and making sure since it isn't our master plan to conserve the wetlands. 823 01:11:41,520 --> 01:11:52,000 I was trying to figure out what actual, are we in the Blue Ridge or we in the Piedmont part of the wetlands map? 824 01:11:52,660 --> 01:11:57,300 I still can't figure that out of exactly where we are, you know, with that. 825 01:11:57,300 --> 01:11:58,240 I'm sure I have to research that. 826 01:11:59,500 --> 01:12:02,260 The applicant's engineer might be able to answer that question. 827 01:12:02,260 --> 01:12:10,500 Okay, just those those couple of questions. Um, and do we have like, is there a way for us to like actually look at 828 01:12:11,360 --> 01:12:15,500 real time the actual disturbance of the the trees? 829 01:12:16,400 --> 01:12:20,100 I know you say 1800 square feet, but like what does it actually look like? 830 01:12:20,340 --> 01:12:28,140 I know we have the map, but like overlaying it on the actual Google Earth to see what that would look like with the with the buffer. 831 01:12:28,140 --> 01:12:30,140 I don't have that capability. 832 01:12:30,620 --> 01:12:31,260 The applicant might. 833 01:12:33,350 --> 01:12:34,650 We'll invite the applicant up. 834 01:12:34,910 --> 01:12:36,150 We're going to have the other questions for staff. 835 01:12:46,490 --> 01:12:48,790 Good evening, Bill Brennan with being our design group 836 01:12:48,790 --> 01:12:51,290 and Craig McLeath, the applicant is also here. 837 01:12:52,890 --> 01:12:55,090 Basic, let's address the, 838 01:12:56,010 --> 01:12:58,730 go through a little bit of the MDE permitting process. 839 01:12:59,730 --> 01:13:03,250 Back in August, we met, we had a pre-application with MDE. 840 01:13:04,270 --> 01:13:05,810 Town was invited to the site. 841 01:13:06,110 --> 01:13:07,130 We had some discussions. 842 01:13:07,130 --> 01:13:09,890 We have two alternates that was discussed. 843 01:13:11,790 --> 01:13:18,930 One with MDE was basically bringing the road through eliminating this ESD and doing an 844 01:13:18,930 --> 01:13:25,770 offset intersection at Thermont Boulevard, which MDE light because it really pushed us 845 01:13:25,770 --> 01:13:28,330 out of all the wet, most of the wetlands. 846 01:13:29,690 --> 01:13:36,250 Town had an issue with it because we had an offset intersection with a major entrance 847 01:13:36,250 --> 01:13:47,070 at WICE, so we also had this alternate, which was a compromise in between, and MDE thought 848 01:13:47,070 --> 01:13:52,030 that was a reasonable alternative at the pre-application meeting. 849 01:13:53,430 --> 01:13:59,010 With the preliminary plan approval or preliminary site plan approval, we're going to move to the 850 01:13:59,010 --> 01:14:09,270 step with MDE, which is what they call basically the wetland groups will do an actual jurisdictional 851 01:14:09,270 --> 01:14:12,990 determination of where the wetland boundaries are. 852 01:14:13,910 --> 01:14:22,210 And that gets flagged, MDE comes out, reviews it, agrees or moves the line depending upon 853 01:14:22,210 --> 01:14:24,830 soil conditions, hydrology, vegetation, 854 01:14:25,490 --> 01:14:27,910 or the three criteria that they look at. 855 01:14:29,170 --> 01:14:31,550 At that time, we go out, survey it, 856 01:14:31,670 --> 01:14:35,070 and then we actually determine what the impacts are. 857 01:14:35,650 --> 01:14:38,450 Right now on this plan, 858 01:14:40,090 --> 01:14:44,470 in blue, this blue boundary right here 859 01:14:45,650 --> 01:14:48,070 is the edge of the wetlands. 860 01:14:48,070 --> 01:14:52,910 but it hasn't been approved by MDE at this point. 861 01:14:53,870 --> 01:14:59,390 The dashed blue line is the buffer area, 25 foot buffer area. 862 01:15:00,000 --> 01:15:29,860 And this site is also in what we call a tier two area, so we'll also have additional reviews for gluten loading on that. So this site does have an extra step in it. Do you know what does tier two mean? Do you know? Do I know I'm not a wetland person, but a tier two is basically you have, I'm going to say class three, natural trout stream, hunting creek. 863 01:15:29,860 --> 01:15:36,800 So therefore, you have your additional review and make sure that you have a reduction in pollutant loading on the stream 864 01:15:36,800 --> 01:15:46,400 because they're trying to keep the natural streams and temperature loading down to the minimum. 865 01:15:47,680 --> 01:15:56,580 The positive on this site is that we do on the, Kelly, you want to go to the overall with the forest easement? 866 01:15:58,540 --> 01:16:07,260 Yeah, where the fro areas, the FRO, that's basically the majority of the wetlands on the rest of the site down in that area, the wet area. 867 01:16:07,960 --> 01:16:16,760 So as we move on to develop the general commercial area, that is the higher side, the high side, and no wetlands in that area. 868 01:16:17,280 --> 01:16:22,740 So we are staying away from the majority of wetlands down in the forest of the area. 869 01:16:24,120 --> 01:16:32,280 So, when we get the preliminary site plan approval, we'll move to the next step, actually 870 01:16:33,920 --> 01:16:42,240 delineating the wet landsline, getting MD out there, finishing up the report, processing 871 01:16:42,240 --> 01:16:49,840 the final plans, such as the culvert crossings, and finishing up that engineering in the 872 01:16:49,840 --> 01:16:53,080 Smith, M.D.E. and Frederick County in the town for their review. 873 01:16:54,180 --> 01:16:56,720 And that's when we move into final construction documents. 874 01:16:57,080 --> 01:17:02,440 And we're not going to, I know Kelly has on the preliminary plan, the first three items 875 01:17:02,440 --> 01:17:06,680 permits, but those permits aren't going to be released until we have final engineering 876 01:17:06,680 --> 01:17:09,200 documents and approval for that. 877 01:17:10,240 --> 01:17:18,220 Item number four, we have the, do I go back to the preliminary site plan, Kelly, please. 878 01:17:19,920 --> 01:17:32,680 item number four, we are proposing the sidewalk to be connected to the existing goodwill and up to this point, but we do show this area as future. 879 01:17:34,060 --> 01:17:39,280 We really don't want to put that in until the site plan is approved on the back end. 880 01:17:39,780 --> 01:17:46,180 We really don't want to take people and drop them to nowhere. 881 01:17:47,700 --> 01:17:58,440 We would rather defer that sidewalk, the construction of this sidewalk, when we have a site for people to go to. 882 01:18:01,070 --> 01:18:06,470 We just don't want to bring them somewhere and drop them off in the middle of the forested area. 883 01:18:07,110 --> 01:18:15,230 We'd rather defer that until we have a site plan and have it constructed during site plan review if that's possible. 884 01:18:15,230 --> 01:18:19,590 Well, that was our thought on that, that's why we haven't. 885 01:18:20,010 --> 01:18:25,470 Otherwise, we recognize we have to have the temporary construction easement where at 886 01:18:25,470 --> 01:18:31,670 the intersection, the roadway intersection is well above the town lot. 887 01:18:32,670 --> 01:18:39,270 So in order to make the roadway 35 foot width and get everything in there, we're going 888 01:18:39,270 --> 01:18:44,850 to have to get a temporary construction easement, which we will work with the town and process 889 01:18:44,850 --> 01:18:48,230 just that through and go through the mayor and commissioners for that. 890 01:18:50,630 --> 01:18:58,230 And we did some on this alignment, we already did some preliminary tractor trailer movements 891 01:18:58,230 --> 01:19:00,270 and we'll just make that part of the plan. 892 01:19:00,430 --> 01:19:02,730 We'll be glad to share that. 893 01:19:03,530 --> 01:19:09,090 It was kind of a rough draft but we'll get that into final form for everybody for the final 894 01:19:09,090 --> 01:19:09,690 site plan. 895 01:19:09,690 --> 01:19:16,430 Are you anticipating a high volume of tractor trailer traffic on this road? No. No. 896 01:19:17,190 --> 01:19:25,390 But you're going to have a commercial user in the back with deliveries. Yeah. Good will. 897 01:19:25,590 --> 01:19:31,830 And granted, they're able to are loading docs on the other side. But when a larger road goes through, 898 01:19:35,000 --> 01:19:41,040 instead of them maybe winding going back out through their driveway, which is a little bit 899 01:19:41,040 --> 01:19:45,980 to the north of here, they might just make a circular route and come out to 900 01:19:45,980 --> 01:19:55,920 Thermal Boulevard to the right. So, that's, yeah. And I think good wills, what one 901 01:19:55,920 --> 01:19:59,160 are they, I think they mentioned they were only going to have like one or two per 902 01:19:59,160 --> 01:20:03,160 week or something. I don't remember all the stuff in my head, but yeah. Yeah, we're not. 903 01:20:03,160 --> 01:20:10,640 Yeah, Sanoco is going to have a lot more truck traffic than we have. 904 01:20:11,360 --> 01:20:16,900 I mean, basically it's going to be deliveries for the commercial facility, whatever it is. 905 01:20:17,200 --> 01:20:19,860 Will the future parking lot connect to the Sanoco parking lot? 906 01:20:20,660 --> 01:20:21,260 Pardon me? 907 01:20:21,500 --> 01:20:24,800 Will the future parking lot connect to the Sanoco parking lot? 908 01:20:25,320 --> 01:20:26,560 No, not right now. 909 01:20:29,460 --> 01:20:34,120 We have approached them and we haven't had a response back. 910 01:20:34,720 --> 01:20:38,980 It is designed that they can make the connection in the future, but we're not going to provide 911 01:20:38,980 --> 01:20:41,500 a connection for them at this point. 912 01:20:42,880 --> 01:20:49,240 And with that, we would appreciate approval of the plenary site plan and maybe modify the 913 01:20:49,240 --> 01:20:54,240 condition of the sidewalk because we would like to construct, we agree with constructing 914 01:20:54,240 --> 01:20:56,800 in the sidewalk around the Goodwill area 915 01:20:56,800 --> 01:20:59,160 but going into the future site 916 01:20:59,160 --> 01:21:00,660 and like to have it affirm it 917 01:21:00,660 --> 01:21:03,180 and have that constructed during the actual site plan. 918 01:21:03,380 --> 01:21:03,980 Good construction 919 01:21:04,480 --> 01:21:07,020 where the construction for the facility later. 920 01:21:08,400 --> 01:21:09,760 I'll say the argument I make with that 921 01:21:09,760 --> 01:21:11,480 is if you're doing the soil disturbance now, 922 01:21:11,480 --> 01:21:14,280 why not just continue and make the sidewalks 923 01:21:14,280 --> 01:21:15,120 in that soil disturbance? 924 01:21:18,310 --> 01:21:19,910 You know, they're gonna be hand, 925 01:21:20,010 --> 01:21:21,950 they're gonna be handicap accessible. 926 01:21:22,990 --> 01:21:24,490 I, you know, it's just that 927 01:21:24,490 --> 01:21:29,970 But why do you want to encourage somebody to go back to the middle of nowhere? 928 01:21:32,270 --> 01:21:34,230 Typically it's been frowned upon. 929 01:21:34,650 --> 01:21:42,710 I know in the old days it used to just do little bits and pieces, but the more and more 930 01:21:42,710 --> 01:21:50,770 the thinking is, till you get a comprehensive plan, don't put people in areas where all of 931 01:21:50,770 --> 01:21:57,690 They have a sidewalk and then they have to go into the street or this point into the woods they go into the woods 932 01:21:57,690 --> 01:22:00,130 I mean, why do we want to encourage somebody? 933 01:22:01,050 --> 01:22:05,390 Well, we are encouraging them to go into the woods because that's the access point to the trolley trail right there. 934 01:22:06,610 --> 01:22:12,770 I mean to be honest, I mean I understand what the applicant is saying but again this site plan is showing the road to be 935 01:22:12,770 --> 01:22:19,470 constructed all the way in to the point where they're showing it to end so and again 936 01:22:19,470 --> 01:22:28,450 And then what if what if what if it does get sold with a property gets sold and then you know there's no guarantee that that future sidewalk work will occur. 937 01:22:29,030 --> 01:22:40,190 So I think it's very important that we ensure that if we're building that road section and the site plan is showing us building that road section that sidewalks are constructed at the same time that road is constructed. 938 01:22:41,750 --> 01:22:48,310 But I remind you, this is not a public road, this is a private road, and you also have 939 01:22:48,310 --> 01:22:56,430 site plan approval in order to, is your hammer in order to build the, I mean we'll be glad 940 01:22:56,430 --> 01:23:02,570 to put the, the pressure in for the handicap ramps, but I need some to the planning commission, 941 01:23:02,570 --> 01:23:08,490 you know typically I would rather wait till we 942 01:23:11,210 --> 01:23:13,930 have a user and know where the site 943 01:23:13,930 --> 01:23:18,070 walks supposed to go but what's the benefit of it being a private road? 944 01:23:20,560 --> 01:23:21,340 Well we 945 01:23:21,340 --> 01:23:25,620 can't make it a public because if we do it right away goodwill becomes an 946 01:23:25,620 --> 01:23:32,860 on-conforming structure to the setbacks where the property line is so we do have 947 01:23:32,860 --> 01:23:38,700 issue. And I don't think we really want to all of a sudden make a brand new building and not 948 01:23:38,700 --> 01:23:45,200 to conform the structure right off the bat. So you pinched between goodwill and the wetlands. 949 01:23:45,840 --> 01:23:51,920 Yeah, I don't know whether it sound really wants to maintain a road. I don't know whether the 950 01:23:51,920 --> 01:23:56,580 public works department really wants to maintain a 35 foot road to one user in the back. 951 01:23:56,580 --> 01:23:56,760 back. 952 01:23:59,180 --> 01:24:05,100 How wide is Thermont Boulevard? Do we know? I don't know off the top of my head. 953 01:24:05,100 --> 01:24:10,580 I have to measure it. It is a 50 foot right of way, at least. It might be even 60 foot 954 01:24:10,580 --> 01:24:10,820 there. 955 01:24:13,480 --> 01:24:18,260 Right now people are parking on that road to get to good well. So if you have tracked 956 01:24:18,260 --> 01:24:21,000 trailers, Thermont Boulevard 40 feet wide. 957 01:24:30,020 --> 01:24:33,240 My issue is, you know, we do a great job of bringing 958 01:24:33,240 --> 01:24:38,720 the tractor trailers into town but then leaving that intersection it's it's not so great so and there's 959 01:24:38,720 --> 01:24:44,340 really no way to improve that there's nowhere for that other lane to go other than 960 01:24:45,780 --> 01:24:54,400 taking parking away from McDonald's or Goodwill or KFC which I don't think we want to do 961 01:24:54,880 --> 01:25:00,980 do you know you know you guys that I'm talking about that's why I asked about the tractor trailer 962 01:25:00,980 --> 01:25:07,780 there. People are parking on Thermal of Art. I don't know why. Let me discuss that later. 963 01:25:10,800 --> 01:25:16,280 That's a big topic. I mean, we need to discuss it now because it's part of it's going to impact 964 01:25:16,280 --> 01:25:21,280 this project. If you've tracked a trailer's trying to turn out and you've got cars parked there, 965 01:25:21,680 --> 01:25:30,180 that's a competing interest. It's not safe. And then who will enforce people parking and 966 01:25:30,180 --> 01:25:34,640 constructing like what if people park they want to they want to go to trolley trail and they park 967 01:25:34,640 --> 01:25:40,820 in your road are you going to have no towing like you know no parking no towing if that happens 968 01:25:41,880 --> 01:25:47,580 probably that's a question for the applicant but I would if it becomes a problem I would think 969 01:25:48,360 --> 01:25:56,860 the no parking signs as mentioned the staff report would be an appropriate solution for that and 970 01:26:00,640 --> 01:26:00,860 can 971 01:26:00,860 --> 01:26:02,880 Can I ask a silly question? 972 01:26:03,020 --> 01:26:12,260 I think we kind of talked about during the concept, but why the road here and not off 973 01:26:12,260 --> 01:26:14,880 of the main road, where you already have the tractor trailer traffic? 974 01:26:19,040 --> 01:26:20,720 We don't have access. 975 01:26:21,680 --> 01:26:22,520 Here comes this ricklee. 976 01:26:22,960 --> 01:26:23,760 He has something to say. 977 01:26:26,420 --> 01:26:29,320 Good evening, Craig McLean from Mountain Gate. 978 01:26:30,460 --> 01:26:31,800 So, you got a couple of questions. 979 01:26:31,800 --> 01:26:38,200 one is the town really doesn't want truck traffic on Frederick Road and their goal 980 01:26:38,200 --> 01:26:42,280 is to get the truck traffic to come out this entrance. The owner of the 981 01:26:42,280 --> 01:26:47,300 snooker is got his property for sale that could be a possibility but he's not 982 01:26:47,300 --> 01:26:52,060 going to spend a month but you're worried about the parking not that I want to go 983 01:26:52,060 --> 01:26:56,280 all the way back but I want to turn goodwill around the other way and have the 984 01:26:56,280 --> 01:26:59,880 parking and then you wouldn't have that parking along the street because the 985 01:26:59,880 --> 01:27:04,020 in front of the store had been facing north. 986 01:27:04,880 --> 01:27:07,080 But now it's facing that way, so you park along the street 987 01:27:07,080 --> 01:27:09,620 and use that sidewalk that you guys want. 988 01:27:10,100 --> 01:27:12,260 You want a sidewalk, so hey, there's a sidewalk there. 989 01:27:12,280 --> 01:27:13,720 It looks like you're supposed to park from there. 990 01:27:14,720 --> 01:27:16,280 But really, you're right. 991 01:27:16,460 --> 01:27:18,000 There's another entrance off of Frederick Road. 992 01:27:18,340 --> 01:27:21,460 The idea of this is to get traffic off of Frederick Road 993 01:27:21,460 --> 01:27:25,620 and get them to use this and to kind of slow down 994 01:27:25,620 --> 01:27:26,680 the traffic on Frederick Road. 995 01:27:26,800 --> 01:27:28,440 That's the idea of the boulevard. 996 01:27:28,440 --> 01:27:33,740 that's the idea, everything trying to get less traffic on the Frederick Road, which for 997 01:27:33,740 --> 01:27:38,720 me is a double-edged sword because I've got a lot of commercial businesses up that way. 998 01:27:38,860 --> 01:27:43,020 So, I really don't want traffic off of Frederick Road, but I can see why the tab would want 999 01:27:43,020 --> 01:27:46,780 traffic off of Frederick Road. So, that's the idea. 1000 01:27:48,960 --> 01:27:49,400 Okay. 1001 01:27:51,670 --> 01:27:53,290 You've been in your questions from Mr. McLean. 1002 01:27:54,330 --> 01:27:54,990 And 1003 01:27:58,540 --> 01:28:03,020 you can't share future use, like what, what were that? 1004 01:28:03,580 --> 01:28:10,000 Well, the original user kind of went dark and I wasn't, I signed a confidential 1005 01:28:10,000 --> 01:28:14,180 agreement with them and they, they, so I can't repeat that. 1006 01:28:15,550 --> 01:28:23,040 We have another user looking at it for doing, you know, like a family center, you know, 1007 01:28:23,040 --> 01:28:27,940 get a car track maybe or something and we have another user that's probably just 1008 01:28:27,940 --> 01:28:34,640 using for parking so it's nothing nothing extreme but again it's like Bill 1009 01:28:34,640 --> 01:28:40,620 says that'll come to planning and zoning and you guys will be able to you know 1010 01:28:40,620 --> 01:28:46,220 have your comments there and say yeah or an air but you'd like to see with the 1011 01:28:46,220 --> 01:28:50,260 future sidewalk I understand what Kelly's saying and understand it needs to be on 1012 01:28:50,260 --> 01:28:56,280 the plan but you know you could have a user back there in six months you could have a user back 1013 01:28:56,280 --> 01:29:01,040 there in six years six years that sidewalk is not going to be any it's going to be all busted up 1014 01:29:01,040 --> 01:29:07,420 and you're really going to not serve the purpose so you know at the end of the day you know we're 1015 01:29:07,420 --> 01:29:13,700 trying to do something nice and bills right it's just a sidewalk going to nowhere so really we're 1016 01:29:13,700 --> 01:29:17,440 We're only going to black top here, and then we're going to barricade this off. 1017 01:29:19,220 --> 01:29:22,200 So we're barricading the road off, so you can't go back there. 1018 01:29:22,620 --> 01:29:24,580 You can't really barricade a sidewalk off. 1019 01:29:25,320 --> 01:29:28,440 But, you know, I understand Kelly's concern. 1020 01:29:31,370 --> 01:29:40,710 Is that something that could be incorporated in an agreement that at the time of development for the second phase of that, that the sidewalk would be expanded? 1021 01:29:42,150 --> 01:29:45,430 unless you're going to record something like that in land records I don't 1022 01:29:45,430 --> 01:29:49,230 recommend it because finding these things again in the future is fraught with 1023 01:29:49,230 --> 01:29:49,570 peril. 1024 01:29:52,420 --> 01:29:55,760 But again when the site when the site playing comes you can make that a 1025 01:29:55,760 --> 01:29:59,820 condition but they can't they can't develop that without finishing 1026 01:30:01,100 --> 01:30:10,180 You guys have all the teeth. But you're selling that so you might not be the same applicant for one that comes up, right? That's true. 1027 01:30:12,260 --> 01:30:19,880 I think that's that's the issue. If we know you were sticking around, it doesn't seem that way. 1028 01:30:21,320 --> 01:30:27,920 I just think about as long as I can, and Madam Chair, remember, whoever owns the property 1029 01:30:27,920 --> 01:30:29,060 doesn't make any difference. 1030 01:30:29,140 --> 01:30:34,620 They have to come before you for site plan, no matter what, you are the final authority. 1031 01:30:35,620 --> 01:30:44,600 We can build a sidewalk to know where, you know, that's fine, but whoever owns that property 1032 01:30:44,980 --> 01:30:48,680 for wherever use is going back there has to come before you for site plan. 1033 01:30:48,680 --> 01:30:55,860 And at that time, you know, pull the plan out, hey, it shows this future, I don't even 1034 01:30:55,860 --> 01:31:01,680 call it base two if you don't like the word future, you know, to be constructed with the 1035 01:31:01,680 --> 01:31:04,760 use on the remainder of the property. 1036 01:31:05,080 --> 01:31:10,280 Maybe that's the compromise, you know, to be specific. 1037 01:31:10,280 --> 01:31:16,200 That is not beyond the future of the site plan, but it has to be constructed with the site 1038 01:31:16,200 --> 01:31:20,280 to play on use, you know, or whoever the user is. 1039 01:31:20,400 --> 01:31:21,840 And I'll be glad to put that on the plane. 1040 01:31:21,980 --> 01:31:25,220 If that makes it more, more powderable. 1041 01:31:25,860 --> 01:31:27,800 So you're going to barricade this part 1042 01:31:27,800 --> 01:31:30,900 until the development for whomever occurs, 1043 01:31:31,360 --> 01:31:35,000 so that there's no other loophole around 1044 01:31:35,000 --> 01:31:37,640 from the other adjacent property to get back in there 1045 01:31:37,640 --> 01:31:38,280 at this time. 1046 01:31:38,800 --> 01:31:40,120 No, it's blocked off as well. 1047 01:31:40,380 --> 01:31:40,580 OK. 1048 01:31:41,640 --> 01:31:45,480 I don't hang out back there, so it wasn't quite sure. 1049 01:31:50,050 --> 01:31:52,390 How do you guys, what do you guys feel about the sidewalk? 1050 01:31:53,850 --> 01:31:55,710 Those signs are good on me. 1051 01:31:56,070 --> 01:31:58,690 I mean this over here carries this point. 1052 01:31:59,850 --> 01:32:04,110 So we're willing to put in ADA curbing as they lay it up. 1053 01:32:05,430 --> 01:32:06,750 Sidewalks, square counts. 1054 01:32:07,250 --> 01:32:08,650 The curbings are just stays. 1055 01:32:08,910 --> 01:32:09,730 You're not, what's happening? 1056 01:32:10,230 --> 01:32:11,270 The roadway in the curbing. 1057 01:32:11,870 --> 01:32:14,510 It actually has an ADA, you know, like the space. 1058 01:32:14,990 --> 01:32:17,910 Here and, I assume that's at both points of contact. 1059 01:32:17,910 --> 01:32:23,750 Well, those are already there, but this is the good one. 1060 01:32:23,810 --> 01:32:24,410 I understand. 1061 01:32:25,330 --> 01:32:25,790 Yeah. 1062 01:32:26,550 --> 01:32:27,830 This is a giant there. 1063 01:32:28,750 --> 01:32:30,030 We've put the depressed curves. 1064 01:32:30,250 --> 01:32:30,750 I see over here. 1065 01:32:31,270 --> 01:32:31,980 I'm never mind. 1066 01:32:32,690 --> 01:32:33,550 I'm a good little guy. 1067 01:32:34,270 --> 01:32:36,010 That is already over there. 1068 01:32:36,190 --> 01:32:36,330 Yeah. 1069 01:32:36,470 --> 01:32:37,950 That's already existing. 1070 01:32:38,270 --> 01:32:39,170 So they'll be turning into things. 1071 01:32:39,530 --> 01:32:40,310 Oh, okay. 1072 01:32:40,510 --> 01:32:42,730 So this is what I'm talking about. 1073 01:32:42,730 --> 01:32:43,910 No, this is here. 1074 01:32:44,250 --> 01:32:44,710 Man enough. 1075 01:32:45,470 --> 01:32:46,410 This is something. 1076 01:32:46,410 --> 01:32:52,490 That's a question. Kelly, can you put the purple blob slide up? 1077 01:32:54,370 --> 01:32:57,270 It's a great one. There you go. 1078 01:32:59,210 --> 01:33:00,110 There's a red blob. 1079 01:33:01,050 --> 01:33:02,110 See, it goes right up. 1080 01:33:02,950 --> 01:33:03,410 That's right. 1081 01:33:05,330 --> 01:33:05,770 Greg, 1082 01:33:12,880 --> 01:33:14,700 what do you think about the sidewalk? 1083 01:33:15,220 --> 01:33:15,380 The 1084 01:33:19,310 --> 01:33:23,170 reason for it is right. We can force the new tenant when they come in to put something in place. 1085 01:33:23,170 --> 01:33:26,350 if it's going to be a bunch of years, that sidewalks is going to get beat. 1086 01:33:29,190 --> 01:33:35,970 What is legal's recommendation to articulate that for the recreation of that easement 1087 01:33:35,970 --> 01:33:39,530 or of the property to ensure that that does happen? 1088 01:33:40,070 --> 01:33:44,890 Well, you would have to have future sidewalk required for subsequent development on the 1089 01:33:44,890 --> 01:33:45,170 flat. 1090 01:33:48,670 --> 01:33:52,450 So we can add that as a condition of approval for this. Correct. Correct. 1091 01:34:04,710 --> 01:34:05,790 24 can be updated. 1092 01:34:08,510 --> 01:34:08,990 The 1093 01:34:17,630 --> 01:34:21,250 applicant, you don't have any, you don't foresee any issues with 1094 01:34:21,250 --> 01:34:27,090 the tractor trailers turning out and having a clear path onto the Thermal of Art. When 1095 01:34:27,090 --> 01:34:33,210 you have traffic coming out of Weiss as well, you don't, and you've got people coming in to 1096 01:34:33,210 --> 01:34:38,030 the good will there. So you've got three different access points right there and then you also have 1097 01:34:38,030 --> 01:34:44,790 the pedestrian crossing from the trail. It is I'll be honest with you it is tight going out 1098 01:34:44,790 --> 01:34:54,510 making the right hand turn and the reason it's tight is the radius is only 25 foot and we can't 1099 01:34:54,510 --> 01:35:01,850 enlarge that because the town has a storm drain structure right at the fillet of the curb return. 1100 01:35:05,270 --> 01:35:11,190 So that's why we have the 35 foot roadway and the center line that 1101 01:35:11,190 --> 01:35:14,870 tractor trailer is going to be right on that center line in order to make that 1102 01:35:14,870 --> 01:35:15,610 turn. 1103 01:35:17,830 --> 01:35:22,930 But he's able to do it. Stay on the right and stay on the center line of 1104 01:35:22,930 --> 01:35:24,350 Thermon Boulevard. 1105 01:35:26,590 --> 01:35:30,230 He's going to go straight out and make one of those hard hard 1106 01:35:30,230 --> 01:35:34,530 but it's doable. It's not the best situation. 1107 01:35:34,770 --> 01:35:38,010 I mean, the remountable of our roll, the curb radius 1108 01:35:38,010 --> 01:35:40,190 should have been at least 30, 35 feet 1109 01:35:41,090 --> 01:35:43,770 for a road of that classification. 1110 01:35:48,110 --> 01:35:50,170 Because this is a private road, 1111 01:35:50,510 --> 01:35:51,950 you can't put a stop sign 1112 01:35:52,530 --> 01:35:54,350 when you're coming off this private road 1113 01:35:54,350 --> 01:35:56,370 and making a right on the the remountable of our, 1114 01:35:56,610 --> 01:35:57,250 is that correct? 1115 01:35:58,270 --> 01:36:00,570 You can make a condition of your approval. 1116 01:36:00,930 --> 01:36:01,210 Absolutely. 1117 01:36:01,210 --> 01:36:05,250 I know legally you can put a stop sign where it's a private access room. 1118 01:36:05,390 --> 01:36:06,050 Yeah, absolutely. 1119 01:36:06,670 --> 01:36:06,770 Yeah. 1120 01:36:07,270 --> 01:36:08,890 There's a public safety issue for sure. 1121 01:36:08,890 --> 01:36:09,090 Okay. 1122 01:36:09,170 --> 01:36:09,450 Yeah. 1123 01:36:09,550 --> 01:36:11,010 We have a stop sign. 1124 01:36:11,190 --> 01:36:12,630 And they do have it on the other side. 1125 01:36:12,870 --> 01:36:14,330 It's kind of hard to see on the little ones here. 1126 01:36:14,350 --> 01:36:14,490 Yeah. 1127 01:36:14,930 --> 01:36:15,410 It's on there. 1128 01:36:15,670 --> 01:36:15,850 Okay. 1129 01:36:20,420 --> 01:36:26,740 And then the pedestrian crossing from the trolley trail coming out with the tractor trailer 1130 01:36:26,740 --> 01:36:29,420 or in just vehicular access, 1131 01:36:30,060 --> 01:36:34,280 how are we directing them through this intersection? 1132 01:36:34,900 --> 01:36:36,560 Good, we're not a truck stop. 1133 01:36:37,840 --> 01:36:40,000 We're gonna have... 1134 01:36:40,000 --> 01:36:41,740 If you're a family fund center, 1135 01:36:42,020 --> 01:36:44,520 that could, that could attract a lot of traffic 1136 01:36:44,520 --> 01:36:45,080 on that intersection. 1137 01:36:45,140 --> 01:36:46,060 But not tractor trailers. 1138 01:36:47,020 --> 01:36:49,120 Yeah, you could, you could ask the applicant 1139 01:36:49,120 --> 01:36:52,660 to put a crosswalk across that intersection. 1140 01:36:52,660 --> 01:36:59,100 If you would like to have them do that, you know, the trail does come up and end there 1141 01:36:59,100 --> 01:37:04,260 at the Roadstub and lead you to the existing sidewalk that is currently there. 1142 01:37:05,340 --> 01:37:09,020 So, I mean, you could potentially ask the applicant to put a crosswalk across there to 1143 01:37:09,780 --> 01:37:10,500 protect pedestrians. 1144 01:37:18,350 --> 01:37:19,690 Sorry, I haven't asked a liaison. 1145 01:37:20,130 --> 01:37:27,130 Do you have the temporary liaison, do you have anything, any questions at this time for 1146 01:37:27,130 --> 01:37:28,830 of the applicant or staff or us? 1147 01:37:29,690 --> 01:37:30,430 Not really. 1148 01:37:30,710 --> 01:37:37,950 My only thought was, and I believe it was pretty much answered why this wasn't accessed 1149 01:37:39,030 --> 01:37:43,350 on the area where the trucks go in and out of the Sonoco property. 1150 01:37:44,530 --> 01:37:49,030 That's tractor trailers all the time in and out of there, and I don't understand why we 1151 01:37:49,030 --> 01:37:54,610 had to put an additional roadway in, but it makes a little more sense, Mr. McLeif explained 1152 01:37:54,610 --> 01:37:59,970 a little better and, you know, to try to keep track traffic all front will further 1153 01:37:59,970 --> 01:38:05,410 grow, I guess, is the answer. But I still think that would have been a better fit for 1154 01:38:05,410 --> 01:38:09,470 that property than what the plan is. Just my opinion. 1155 01:38:10,630 --> 01:38:16,810 But we don't have access to that property. We don't have legal access through there. 1156 01:38:20,300 --> 01:38:24,700 And that wasn't at your fault. You did try to work it out with that property owner, 1157 01:38:24,800 --> 01:38:25,120 correct? 1158 01:38:25,120 --> 01:38:54,820 Well, I let Mr. McCleef speak about that so that's not true. I have legal access. I can get legal access, but again, we're trying to get traffic off of Frederick Road and on the Thermal Boulevard to the light because all the traffic would come out there. There's no light and then they'd have to come out the intersection of cars, trucks, whatever you come down here, you come on the Thermal Boulevard and you come out to the light. 1159 01:38:55,120 --> 01:38:59,120 So the whole idea was to get traffic off of the program. 1160 01:39:03,610 --> 01:39:04,910 Yeah, no, I understand what you're saying. 1161 01:39:05,250 --> 01:39:07,890 All right. 1162 01:39:12,840 --> 01:39:13,920 Gentlemen, what's your pleasure? 1163 01:39:16,320 --> 01:39:18,180 If you have any other questions for the applicant. 1164 01:39:19,900 --> 01:39:20,300 Staff. 1165 01:39:29,710 --> 01:39:29,950 All right. 1166 01:39:30,110 --> 01:39:32,030 If there's no additional comments or questions, 1167 01:39:32,030 --> 01:39:33,130 I'll open the floor. 1168 01:39:34,310 --> 01:39:36,470 Do we want to make a motion? Do we have a motion? 1169 01:39:37,450 --> 01:39:38,250 Public comment? 1170 01:39:38,510 --> 01:39:38,930 Oh, sorry. 1171 01:39:38,990 --> 01:39:40,770 Did you get the sign-on sheet for that? 1172 01:39:40,770 --> 01:39:41,510 I did not. 1173 01:39:41,730 --> 01:39:41,810 Yeah. 1174 01:39:42,250 --> 01:39:42,310 Yep. 1175 01:39:42,750 --> 01:39:42,830 Oh. 1176 01:39:43,730 --> 01:39:45,630 Early A's on is going to bring it to you. 1177 01:39:53,560 --> 01:39:54,800 They're not here for that. 1178 01:39:55,420 --> 01:39:55,900 Okay. 1179 01:39:56,720 --> 01:39:57,420 Hold it. 1180 01:40:07,780 --> 01:40:08,740 Thank you. 1181 01:40:13,240 --> 01:40:18,120 I should really just ask, is there anyone here on the sign-in sheet that's here to speak about 1182 01:40:18,120 --> 01:40:19,160 this particular project? 1183 01:40:21,930 --> 01:40:26,150 Is there anybody that would like to give comment on this project going 1184 01:40:29,250 --> 01:40:32,310 once, twice? 1185 01:40:33,610 --> 01:40:40,170 Okay, seeing that there is no public comment, I will open the floor to accept a motion. 1186 01:40:44,430 --> 01:40:47,210 Did we agree on the sidewalk before we make that motion? 1187 01:40:50,670 --> 01:40:51,850 It's going to change the wording. 1188 01:40:52,150 --> 01:40:53,670 Right, I think so. 1189 01:40:53,910 --> 01:40:55,010 As long as it can be reported. 1190 01:40:56,390 --> 01:40:57,130 Recorded from that. 1191 01:40:57,570 --> 01:40:59,090 It has to be part of the future site plan. 1192 01:40:59,730 --> 01:41:03,770 Right, and is there specific language other than just on the plat? 1193 01:41:03,770 --> 01:41:04,650 on the plaque. 1194 01:41:06,910 --> 01:41:11,410 There's nowhere else to put it at the stage of the game. 1195 01:41:12,270 --> 01:41:14,070 But any specific wording that should be on there? 1196 01:41:14,650 --> 01:41:20,130 Just a future sidewalk connection required, combined with laws and effects at the time. 1197 01:41:20,350 --> 01:41:26,230 Basically, it's what it's going to say. I mean, keeping in mind, you know, 1198 01:41:26,310 --> 01:41:30,910 the requirements of your master plan as well, which actually says that will 1199 01:41:30,910 --> 01:41:36,050 have sidewalks everywhere you can put them and this is your opportunity to 1200 01:41:36,050 --> 01:41:42,030 require it because what we don't want to have happen is for somebody else to 1201 01:41:42,030 --> 01:41:46,710 buy parcel number two and say well we're going to come in off of a public 1202 01:41:46,710 --> 01:41:51,700 street and that's not our problem keep that in mind. 1203 01:41:59,760 --> 01:42:01,180 And did you decide whether you 1204 01:42:01,180 --> 01:42:07,300 wanted a crosswalk across the access room from the trolley trail the other side? I 1205 01:42:07,300 --> 01:42:08,740 we should add that requirement. 1206 01:42:16,880 --> 01:42:19,660 So there'll be nine conditions of approval. 1207 01:42:20,720 --> 01:42:24,280 Good you're going to modify number four. Yes. Okay. 1208 01:42:27,790 --> 01:42:28,450 Bless you. 1209 01:42:35,800 --> 01:42:37,940 Oh, you want motion? Okay. Yeah. Okay. 1210 01:42:39,580 --> 01:42:44,120 It's been a while since I did this. I forget what I was supposed to say. Make a motion to 1211 01:42:45,040 --> 01:42:48,140 recommend conditional approval of the 1212 01:42:53,480 --> 01:42:56,880 Mountain Gate Business Park Access Road 1213 01:42:59,040 --> 01:43:05,200 CP1-PP-205-01 as listed. 1214 01:43:05,500 --> 01:43:06,820 Do I need to read through all the items? 1215 01:43:07,280 --> 01:43:07,400 Yes. 1216 01:43:07,500 --> 01:43:07,860 Yes, you do. 1217 01:43:08,620 --> 01:43:09,060 Okay. 1218 01:43:10,520 --> 01:43:11,320 As follows. 1219 01:43:12,000 --> 01:43:13,840 One, Maryland Department of Environment, 1220 01:43:13,980 --> 01:43:14,740 Permit Approval. 1221 01:43:14,740 --> 01:43:18,540 two, Frederick County Stormwater Management Plan approval, 1222 01:43:19,020 --> 01:43:23,420 three, Frederick County Erosion and Sediment Control Plan approval, 1223 01:43:24,460 --> 01:43:29,720 four, all sidewalks should be shown in the same gray gradient 1224 01:43:30,480 --> 01:43:33,620 and the words, future sidewalk, I'm 1225 01:43:36,120 --> 01:43:36,380 already. 1226 01:43:39,150 --> 01:43:40,470 You had a word for it, ma'am. 1227 01:43:40,870 --> 01:43:42,910 Future sidewalk required, thank you. 1228 01:43:42,970 --> 01:43:45,550 Yeah, I think that the other thing, 1229 01:43:45,550 --> 01:43:45,950 Yeah, 1230 01:43:48,610 --> 01:43:54,730 I'm just concerned about the whole coming in from another direction on the second 1231 01:43:54,730 --> 01:43:56,530 parcel to be developed in the future. 1232 01:43:57,750 --> 01:44:02,370 And imposing a requirement on a road that they don't need. 1233 01:44:04,330 --> 01:44:05,570 That concerns me. 1234 01:44:05,990 --> 01:44:08,610 Can we overrule our own recommendation from this? 1235 01:44:09,390 --> 01:44:10,190 You can start over. 1236 01:44:10,650 --> 01:44:10,790 Right. 1237 01:44:11,050 --> 01:44:11,310 That's right. 1238 01:44:11,330 --> 01:44:12,530 We just started over at that point. 1239 01:44:12,670 --> 01:44:14,890 That way it's on there and we can erase it later if we need to. 1240 01:44:16,470 --> 01:44:18,370 No, I think you're suggesting doing it now? 1241 01:44:18,370 --> 01:44:22,830 Yeah, I'm just that the issue the the concern that I have is 1242 01:44:24,370 --> 01:44:30,530 If you want the sidewalk in the future, but it's not a this is a private road 1243 01:44:31,170 --> 01:44:32,590 owned by two other 1244 01:44:33,170 --> 01:44:34,150 property owners 1245 01:44:35,090 --> 01:44:40,030 How are you going to impose that requirement on somebody new to the table? 1246 01:44:42,090 --> 01:44:45,470 That doesn't have a right of access to that public road 1247 01:44:46,030 --> 01:44:47,390 That is my concern 1248 01:44:50,550 --> 01:44:56,670 But this will be so worth a plus because it's this word is being built to access both of those 1249 01:44:56,670 --> 01:44:57,190 sides. 1250 01:44:57,610 --> 01:44:57,670 Right. 1251 01:44:57,870 --> 01:44:59,870 I was going to say is it being re-plated to this 1252 01:45:07,320 --> 01:45:29,980 All of it. Correct. Correct. So the deed is not there to do a subdivision plat at this point. It is just for the access road construction. When they get to the development of that site, then yes, we would recommend that subdivision be occurred. Subdivision plat would occur. Simul 1253 01:45:29,980 --> 01:45:34,120 simultaneously with the site plan for the development of that site. 1254 01:45:34,420 --> 01:45:43,500 Well, then maybe that's the thing to do to say that it's a requirement of subdivision approval on part two. 1255 01:45:44,400 --> 01:45:49,780 Yeah, I think that we can hope we have legal grounds with that because I mean, currently, if there's a transfer of ownership, 1256 01:45:50,420 --> 01:45:53,480 who would maintain who would end up with this road is the question. 1257 01:45:53,480 --> 01:45:58,860 So, because the which is another reason we need the easement right because you don't want to wind up with 1258 01:46:01,140 --> 01:46:03,780 a recorded flat and no easement document. 1259 01:46:07,370 --> 01:46:14,610 So you said it should say a future sidewalk required as part of some division approval period or you had some 1260 01:46:14,610 --> 01:46:22,070 additional language earlier complying with future laws of effect. I would add that to. Okay, but it's quite by definition it will have to. 1261 01:46:22,070 --> 01:46:29,590 But it doesn't hurt to put it in but you know when the whatever somebody develops property 1262 01:46:29,590 --> 01:46:36,990 you have an obligation to comply with hitting upon the face you know current requirements. 1263 01:46:37,990 --> 01:46:44,430 So an ADA sidewalk things change over time as we all know and they get bigger typically 1264 01:46:44,430 --> 01:46:51,170 they don't get smaller so I think that that doesn't hurt to add. 1265 01:46:51,170 --> 01:47:00,590 okay but one one second for point of clarity so that particular item doesn't say 1266 01:47:00,590 --> 01:47:03,670 anything about an easement though it just talks about the sidewalks no that's 1267 01:47:03,670 --> 01:47:06,790 one of your other conditions okay yeah just point of order just making sure there 1268 01:47:06,790 --> 01:47:14,170 were I think we have got that one okay proceed do I start all the way at the beginning 1269 01:47:14,170 --> 01:47:16,110 I think I picked up a number four. 1270 01:47:16,230 --> 01:47:16,270 Yes. 1271 01:47:16,270 --> 01:47:17,770 Well, let's start over. 1272 01:47:18,730 --> 01:47:19,750 It's up to you. 1273 01:47:20,210 --> 01:47:22,390 Does the motion have to die before we restart it? 1274 01:47:23,810 --> 01:47:26,490 Well, we technically took discussion out of order. 1275 01:47:26,710 --> 01:47:29,310 Typically, the motion is made and then there's discussion. 1276 01:47:29,730 --> 01:47:31,330 And then the motion can die. 1277 01:47:31,470 --> 01:47:33,470 So we didn't quite exactly do this, 1278 01:47:34,090 --> 01:47:35,530 according to Robert's rules. 1279 01:47:36,930 --> 01:47:38,650 Okay, start over. 1280 01:47:41,910 --> 01:47:53,410 Okay, make a motion for conditional approval of the preliminary site plan for C1-PP-2025-01. 1281 01:47:54,310 --> 01:47:59,150 Mountain Gate Business Park, Thermal Business Park Access Road, situated east of Goodwill. 1282 01:48:01,140 --> 01:48:09,660 The items are one, Maryland Department of Environmental Permit Approval, two, Frederick County Stormwater 1283 01:48:09,660 --> 01:48:15,280 management plan approval, three, Frederick County erosion and sediment control plan approval, 1284 01:48:15,700 --> 01:48:24,420 four, all sidewalks should be shown on the same gray gradient and the words futures sidewalk 1285 01:48:24,420 --> 01:48:30,300 required as part of subdivision approval, complying with future laws in effect. 1286 01:48:32,180 --> 01:48:37,500 Okay, five, temporary construction easement must be obtained from the town of Thurmont, 1287 01:48:37,500 --> 01:48:51,880 6, access management agreement established between Goodwill Property and the applicant's property which shall be reviewed by the town attorney to ensure that each property owner is responsible for their fair share of road maintenance. 1288 01:48:52,640 --> 01:49:01,880 7, a separate plan sheet or in addition to an existing plan sheet to show the tractor trailers can easily maneuver the access road. 1289 01:49:01,880 --> 01:49:11,660 8, minor plan edits, a, add north arrow to the site plan, b, the seal and signature 1290 01:49:11,660 --> 01:49:17,240 of a registered Maryland land surveyor, and or the seal and signature of licensed engineer 1291 01:49:17,240 --> 01:49:23,960 or landscape architect must be added to the site plan, only on sheets 7 and 8, item 1292 01:49:23,960 --> 01:49:31,080 c, appropriate signature blocks should be provided on all sheets of the site plan, 4 of the 1293 01:49:31,080 --> 01:49:34,080 Administrative sign for the town, missing on sheet two. 1294 01:49:34,620 --> 01:49:41,940 And the new item nine, add crosswalk from trolley trail across access road. 1295 01:49:43,800 --> 01:49:57,970 Okay, I have a motion on the floor for conditional approval for preliminary site plan C1-PP-2025-01-mountain gate business park with nine conditions. 1296 01:49:58,450 --> 01:49:59,210 Do I have a second? 1297 01:49:59,670 --> 01:50:00,870 I'll second the motion. 1298 01:50:00,870 --> 01:50:02,390 Any discussion? 1299 01:50:04,970 --> 01:50:06,850 All those in favor? Please raise your right hand. 1300 01:50:08,990 --> 01:50:10,270 Thank you. Motion carries. 1301 01:50:13,350 --> 01:50:13,670 Thank you. 1302 01:50:17,610 --> 01:50:30,130 All right. Next item on the agenda is the public hearing. Annication petition AX-CP-2024-01, 1303 01:50:30,130 --> 01:50:34,270 one, Simmer's property, 304 apples church road. 1304 01:50:35,190 --> 01:50:38,510 As Kelly stated earlier, we will be starting over. 1305 01:50:39,050 --> 01:50:42,290 Kelly will be reading us for a lovely note yet again. 1306 01:50:42,910 --> 01:50:43,090 Kelly? 1307 01:50:43,390 --> 01:50:43,830 Let's 1308 01:50:50,520 --> 01:50:51,820 see the right slides here. 1309 01:50:56,410 --> 01:50:56,790 Bless you. 1310 01:50:57,870 --> 01:51:00,050 Okay, I'm just gonna read the exact same thing. 1311 01:51:00,170 --> 01:51:02,270 I read previously for the purpose 1312 01:51:02,270 --> 01:51:03,530 of our public hearings tonight. 1313 01:51:04,310 --> 01:51:06,510 So the petition for annexation, application, 1314 01:51:06,910 --> 01:51:08,850 it has but it was submitted completely 1315 01:51:08,850 --> 01:51:13,530 and all the feeds were paid. The application was provided to the Board of Commissioners 1316 01:51:13,530 --> 01:51:19,710 at their December or 2024 meeting at which time they delegated it to you the Planning and 1317 01:51:19,710 --> 01:51:24,690 Zoning Commission for the Code. The applicant is here tonight, adjoining properties have been 1318 01:51:24,690 --> 01:51:31,330 notified via certified mail, advertised in the Frederick News Post and the property was posted. 1319 01:51:31,330 --> 01:51:32,070 As 1320 01:51:34,760 --> 01:51:42,260 previously stated, the petition for the Simmer's property along Appleschurch Road is located 1321 01:51:42,260 --> 01:51:48,640 at the corner where Appleschurch Road intersects with Roddy Road and Isler Road. This is the 1322 01:51:48,640 --> 01:51:55,200 same property that was the subject of the 2022 annexation resolution that went to a 1323 01:51:55,200 --> 01:52:01,120 referendum vote and was denied. Tonight's Planning and Zoning Commission wanted to discuss 1324 01:52:01,120 --> 01:52:07,280 the proposal after workshop, which they already have, as well as here from town residents. 1325 01:52:07,720 --> 01:52:11,640 During this public hearing, the Planning Commission can also act with the applicants, 1326 01:52:11,920 --> 01:52:17,640 ask questions of staff, ask questions of the applicant, as well as here public comment. 1327 01:52:18,540 --> 01:52:21,640 The town's code regulates how annexations are processed. 1328 01:52:22,020 --> 01:52:26,320 This is located in section 3.3 in the zoning ordinance. 1329 01:52:27,880 --> 01:52:34,260 Anxations are regulated by the state of Maryland's local government article as well as the 1330 01:52:34,260 --> 01:52:35,100 town's code. 1331 01:52:36,040 --> 01:52:41,740 The article indicates that if a complete annexation petition application is submitted 1332 01:52:41,740 --> 01:52:44,200 to the town commissioners, they must review it. 1333 01:52:44,700 --> 01:52:47,000 They cannot just outright deny it. 1334 01:52:49,800 --> 01:52:54,520 In the town's code, it specifically indicates that the board of commissioners must delegate 1335 01:52:54,520 --> 01:52:58,340 a review of the petition to the Planning and Zoning Commission. 1336 01:52:58,620 --> 01:53:04,600 The Planning and Zoning Commission is charged with developing a written recommendation to the Board of Commissioners, 1337 01:53:04,920 --> 01:53:09,580 and they serve in an advisory capacity on annexations. 1338 01:53:09,780 --> 01:53:10,940 They don't make the decision. 1339 01:53:11,780 --> 01:53:15,400 The Board of Commissioners holds a public hearing before making their decisions. 1340 01:53:16,080 --> 01:53:19,940 They are the sole decision makers on annexations. 1341 01:53:19,940 --> 01:53:29,540 The planning and zoning commission has several items they must report on to the board of commissioners. 1342 01:53:29,920 --> 01:53:35,420 The degree of conformance with the Thermot master plan in general and specifically in regards 1343 01:53:35,420 --> 01:53:39,340 to the Thermot municipal growth element in the master plan. 1344 01:53:40,020 --> 01:53:45,960 They must report on the availability of public facilities and services to meet the demands 1345 01:53:45,960 --> 01:53:47,500 of the proposed development. 1346 01:53:47,500 --> 01:53:54,980 They must report on the viability and practicality of public improvement plans for utilities 1347 01:53:54,980 --> 01:53:57,280 and services for the post-development. 1348 01:53:58,200 --> 01:54:03,900 They must also address if the annexation proposal should be approved or denied as well 1349 01:54:03,900 --> 01:54:08,860 as any conditions of approval if they so choose to make that recommendation. 1350 01:54:09,540 --> 01:54:17,060 Review of the concept plan per the town code on concept plans which is located in 3.1.4 1351 01:54:17,060 --> 01:54:22,320 of the zone ordinance, as well as the proposed zoning district. 1352 01:54:23,260 --> 01:54:28,840 They must also report on how the annexation proposal impacts the planning and timing 1353 01:54:28,840 --> 01:54:34,640 of infrastructure, and they must report on what the zoning classification of the property 1354 01:54:34,640 --> 01:54:36,700 should be upon annexation. 1355 01:54:38,200 --> 01:54:43,520 The concept plan will be held to the regulations of concept plans in the town code. 1356 01:54:46,360 --> 01:54:52,440 Thermaltz annexation process is unique from other municipalities, and that it requires 1357 01:54:52,440 --> 01:54:56,020 an detailed concept plan, as you can see here. 1358 01:54:56,340 --> 01:55:04,380 A lot of other municipalities just have a very amoeba-like concept that processes with 1359 01:55:04,380 --> 01:55:05,360 an annexation plan. 1360 01:55:05,560 --> 01:55:09,400 So we really get into the NITS with planning here. 1361 01:55:09,400 --> 01:55:16,320 So the concept plan associated with any project tends to go through multiple 1362 01:55:17,200 --> 01:55:22,200 reiterations where recommendations are made and the applicant addresses those by 1363 01:55:22,200 --> 01:55:27,880 amending their concept plan. And they have done that here tonight so you have a 1364 01:55:27,880 --> 01:55:34,120 different rendering than what we saw in January. This can create multiple 1365 01:55:34,120 --> 01:55:39,200 versions of the plan so that it should be expected at this point and through the 1366 01:55:39,200 --> 01:55:44,820 review process. And it can even change after you all make your recommendation. It can 1367 01:55:44,820 --> 01:55:49,900 change with the mayor and commissioners during their review process and negotiation process. 1368 01:55:50,840 --> 01:55:57,380 The concept plan is a binding agreement between the developer and the town. As a matter of 1369 01:55:57,380 --> 01:56:03,060 fact, if an annexation is approved, the applicant must still submit to the town to you the planning 1370 01:56:03,060 --> 01:56:08,260 and zoning commission and a subdivision plaque and a site plans review. So you'll get even 1371 01:56:08,260 --> 01:56:15,160 more into the details of those plans in the future if everything aligns. 1372 01:56:15,920 --> 01:56:20,940 And any plan submitted must be in compliance with the approved annexation concept plan. 1373 01:56:25,050 --> 01:56:29,990 The property currently has a portion within town limits and a larger portion that is located 1374 01:56:29,990 --> 01:56:31,130 outside of town limits. 1375 01:56:31,650 --> 01:56:38,070 The cart within town is approximately 7.79 acres that is currently zoned to our five high 1376 01:56:38,070 --> 01:56:39,050 density residential. 1377 01:56:39,050 --> 01:56:44,990 It allows for a maximum density of approximately 10 dwellings per acre. 1378 01:56:45,350 --> 01:56:50,910 The larger part of the parcel was located outside of the town, municipal boundary and 1379 01:56:50,910 --> 01:56:53,090 is directly attached to the town. 1380 01:56:53,630 --> 01:57:01,030 The county portion of the parcel is over 16 acres in size and is zone agriculture in the 1381 01:57:01,030 --> 01:57:01,230 county. 1382 01:57:02,510 --> 01:57:08,390 The proposed zoning for the property is R5, which is the zoning category recommended in the 1383 01:57:08,390 --> 01:57:12,190 master plan and you can see that on the map there in front of you are 1384 01:57:12,190 --> 01:57:15,790 zoning map as well as the growth area map. 1385 01:57:21,310 --> 01:57:23,330 One of the key elements is adequate 1386 01:57:23,330 --> 01:57:28,370 public facilities and that you must address in your review process and comments to 1387 01:57:28,370 --> 01:57:33,930 the mayor commissioners. One, an impact or traffic impact study must be done 1388 01:57:33,930 --> 01:57:39,530 and of course the applicant has acknowledged that and is intending to allow that 1389 01:57:39,530 --> 01:57:46,910 to occur. Water capacity is available there will be a need for some system upgrades and obviously 1390 01:57:46,910 --> 01:57:54,250 infrastructure will have to be extended into the site at the developer's expense. The sewer 1391 01:57:54,250 --> 01:57:59,570 capacity is available but there will also need to be certain upgrades to the existing pump station 1392 01:58:00,160 --> 01:58:06,350 and obviously the infrastructure will have to be extended into the site again at the developer's 1393 01:58:06,350 --> 01:58:14,370 costs and the developer also have to install sanitary sewer grinder pumps for the assisted 1394 01:58:14,370 --> 01:58:20,350 living facility that's proposed. According to Frederick County Public Schools quarterly 1395 01:58:20,350 --> 01:58:26,950 report schools are operating below capacity and it is expected to remain below capacity 1396 01:58:27,290 --> 01:58:33,230 for the next ten years. Electric service from the town is available to serve the community 1397 01:58:33,230 --> 01:58:40,890 And it would be served via Isla Road, and require electric system upgrades and lines would also have to be extended 1398 01:58:40,890 --> 01:58:44,870 extended into the site at the developer's cost. 1399 01:58:46,130 --> 01:58:53,830 Emergency services have provided comments, which you all have, and the items of concern were roadwayed with. 1400 01:58:54,910 --> 01:59:00,950 No parking along the streets except for where parallel bump-outs are provided. 1401 01:59:00,950 --> 01:59:07,730 full street connection to Luther Drive, rather than just an emergency access, only connection. 1402 01:59:08,770 --> 01:59:18,270 And the assisted living facility will also produce additional stress on the already stressed ambulance company. 1403 01:59:19,790 --> 01:59:26,930 As previously stated, the property is in the town's growth area of the master plan. 1404 01:59:26,930 --> 01:59:33,310 And the applicant is proposing an R5 zoning, which, again, is compliant with the master plan. 1405 01:59:34,810 --> 01:59:35,390 That's it. 1406 01:59:38,080 --> 01:59:39,360 Any questions for Kelly? 1407 01:59:42,200 --> 01:59:42,720 Okay. 1408 01:59:42,960 --> 01:59:44,120 We'll invite the applicant up. 1409 01:59:48,200 --> 01:59:51,940 Madam Chairman, I'm Daniel Cross, Cross and Company and Frederick Merrill on the contract 1410 01:59:51,940 --> 01:59:53,160 purchase or the parcel. 1411 01:59:54,600 --> 01:59:58,980 I would like to do a quick summation, but I'm actually much more interested in hearing the 1412 01:59:58,980 --> 01:59:59,960 public comments. This is 1413 02:00:00,000 --> 02:00:29,940 Good evening, and being able to respond to them, then giving you the same briefing I've given on a couple of occasions. What I would point out is we believe we are responding to the citizens overturning the last annexation request that the then planning commission approved and that the then board of commissioners approved. What we believe we heard was that we had too high a density, even though we followed instruction to that level of density. And our building style of 1414 02:00:29,940 --> 02:00:31,640 the condominium apartment buildings 1415 02:00:31,640 --> 02:00:33,780 was not considered appropriate for Thermite. 1416 02:00:34,180 --> 02:00:37,400 What we've come back with is 11 single family homes 1417 02:00:37,900 --> 02:00:39,860 on the west side of the site, 1418 02:00:40,420 --> 02:00:42,260 abutting the single family homes 1419 02:00:42,260 --> 02:00:43,980 that are on Apple's church road 1420 02:00:44,560 --> 02:00:45,860 or that are in pleasant acres 1421 02:00:45,860 --> 02:00:48,740 so that if you're in a single family home 1422 02:00:48,740 --> 02:00:50,840 out there today and you look at your window, 1423 02:00:51,140 --> 02:00:53,800 you see a similar house type to what you have. 1424 02:00:54,740 --> 02:01:00,660 We placed the senior living primary bedroom 1425 02:01:00,660 --> 02:01:08,140 on the ground floor senior living villa townhouses on the uphill section of budding Albert 1426 02:01:08,140 --> 02:01:15,900 Courts age 55 next to intended senior living and we placed the family townhouses, I have 1427 02:01:15,900 --> 02:01:21,640 to be careful as a broker, I can't say family, the open market townhouses on the downhill 1428 02:01:21,640 --> 02:01:28,400 site and I provided during our work session part of our rationale as far as reducing the 1429 02:01:28,400 --> 02:01:29,520 vertical size. 1430 02:01:30,320 --> 02:01:36,540 As said during the work session, the concept 2 version 2 that you have up is because we've 1431 02:01:36,540 --> 02:01:41,940 gone to 60 foot road right-of-ways, not yet a requirement of the town, but anticipating 1432 02:01:41,940 --> 02:01:43,300 that that might happen. 1433 02:01:44,240 --> 02:01:51,180 And we are providing for storm order for our community at the bottom of the hill, frankly 1434 02:01:51,180 --> 02:01:56,040 where it has always been shown in all the concept plans that go back to Albert courts in the 1435 02:01:56,040 --> 02:02:02,580 early 90s and we are providing a possible solution for Albert Court's current storm 1436 02:02:02,580 --> 02:02:07,040 motor management issues at the top of the hill. I stand ready for questions. 1437 02:02:09,500 --> 02:02:13,980 I've got one about the you keep saying about the 55 plus are you going to 1438 02:02:13,980 --> 02:02:18,180 designate homes to only be 55 plus in this community? No, they're just going to 1439 02:02:18,180 --> 02:02:22,680 be designed that way. They're designed to that accord but you know there may be 1440 02:02:22,680 --> 02:02:26,300 younger people who want a bedroom on the ground floor with a primary bathroom 1441 02:02:26,300 --> 02:02:29,140 and 36-inch stores and a no-zero threshold shower. 1442 02:02:29,280 --> 02:02:31,020 I looked at your May-a-states a few times. 1443 02:02:35,740 --> 02:02:37,220 Would you do you think it's appropriate 1444 02:02:37,220 --> 02:02:39,100 that we've finished a conversation about this 1445 02:02:39,100 --> 02:02:39,840 from one of my management? 1446 02:02:41,960 --> 02:02:42,760 That would be the workshop. 1447 02:02:43,240 --> 02:02:45,020 We didn't really ask questions of it. 1448 02:02:45,200 --> 02:02:46,380 Do you want to do that first? 1449 02:02:46,840 --> 02:02:47,140 I don't. 1450 02:02:47,460 --> 02:02:48,240 Personally, I have any questions. 1451 02:02:48,440 --> 02:02:49,560 Do that after the comments. 1452 02:02:49,820 --> 02:02:50,180 I do. 1453 02:02:50,280 --> 02:02:50,760 You do comments. 1454 02:02:51,600 --> 02:02:51,960 Okay. 1455 02:02:52,160 --> 02:02:53,580 But the folks have waited a long time. 1456 02:02:53,900 --> 02:02:54,120 Okay. 1457 02:02:54,300 --> 02:02:55,420 Yeah, exactly. 1458 02:02:56,140 --> 02:02:56,400 All right. 1459 02:02:57,580 --> 02:02:57,760 Okay. 1460 02:02:57,800 --> 02:02:59,360 So we're going to go into public comment. 1461 02:03:02,220 --> 02:03:07,060 We're going to go right down the list, so when I call your name, please come to the podium. 1462 02:03:08,660 --> 02:03:09,500 Bernadette Wright, 1463 02:03:11,750 --> 02:03:12,930 Mary Crutchley, 1464 02:03:15,210 --> 02:03:17,950 Daniel Cross, David Fogel, 1465 02:03:20,920 --> 02:03:22,400 please state your name 1466 02:03:22,400 --> 02:03:25,200 if you live in town, and if you've been sworn in, please. 1467 02:03:26,540 --> 02:03:30,200 David Fogel, I have a 121 mortistry. 1468 02:03:30,820 --> 02:03:36,040 I asked the question about back up after this one, two or three years from now. 1469 02:03:36,840 --> 02:03:41,900 If the bill is going to dry out there because that house development, are you guys coming 1470 02:03:41,900 --> 02:03:43,140 back to replacing the bills? 1471 02:03:44,720 --> 02:03:50,680 A point-of-order, sir, make sure that you please address all of your questions and concerns 1472 02:03:50,680 --> 02:03:51,760 directly to the commission. 1473 02:03:52,560 --> 02:03:58,060 The applicant, he will come back and answer, but just make sure that you're posing the 1474 02:03:58,060 --> 02:04:00,000 questions to the commission and to staff, please. 1475 02:04:00,620 --> 02:04:06,260 I just asked about the wells, if the wells go straight out there because of the development, 1476 02:04:07,280 --> 02:04:11,620 they're going to come back and drill us a new well, or as a town people might have paid 1477 02:04:11,620 --> 02:04:17,180 for a new well and so, and another thing, who's going to take care of all the streets and 1478 02:04:17,180 --> 02:04:21,760 stuff out there once they move out, is that going to be up to the town, or is that going 1479 02:04:21,760 --> 02:04:27,860 to be up to the development out there, have some like repaced black tops and the sidewalks 1480 02:04:27,860 --> 02:04:28,700 and stuff that they get? 1481 02:04:28,700 --> 02:04:32,380 Are you talking about the existing development that's already there? 1482 02:04:33,120 --> 02:04:38,600 But for Albert's court, is that what's called the currently? 1483 02:04:39,360 --> 02:04:39,520 No. 1484 02:04:41,120 --> 02:04:44,600 I mean, the townhouses under the condos. 1485 02:04:44,980 --> 02:04:46,280 Yeah, that's all part of Albert's court. 1486 02:04:46,760 --> 02:04:49,840 Okay, so your concern is the existing Albert courts? 1487 02:04:50,640 --> 02:04:52,560 I'm talking about the development you're putting in here. 1488 02:04:53,040 --> 02:04:55,720 So you're talking about the new development. 1489 02:04:55,900 --> 02:04:57,940 Those are going to be public streets. 1490 02:04:57,940 --> 02:05:04,580 So the town would be maintaining those the town can't handle what they got now. How they got a handle note of element 1491 02:05:05,880 --> 02:05:07,320 That's a lot of people out there 1492 02:05:08,460 --> 02:05:14,080 You come up right right now sometimes in the evening. It's back back the clean down past town 1493 02:05:14,080 --> 02:05:17,020 Fork you're talking about not a two hundred quarters in the town limits 1494 02:05:19,000 --> 02:05:20,560 That's all I thank you, sir. 1495 02:05:23,670 --> 02:05:24,650 Renee Freely 1496 02:05:29,710 --> 02:05:31,830 Rocky Freely 1497 02:05:36,990 --> 02:05:38,550 a question about the lawsuit. 1498 02:05:39,550 --> 02:05:41,170 You're suing the residents for something. 1499 02:05:41,170 --> 02:05:41,890 Sir, a point of order. 1500 02:05:42,410 --> 02:05:42,510 Yeah. 1501 02:05:43,070 --> 02:05:44,830 You please address all of your questions 1502 02:05:44,830 --> 02:05:46,270 to concerns to the commission and staff. 1503 02:05:46,410 --> 02:05:48,670 OK, this is a question too, Daniel, though. 1504 02:05:48,890 --> 02:05:52,390 He is sued the residents of Thermont for $75,000 a piece 1505 02:05:52,970 --> 02:05:54,330 for something they didn't do. 1506 02:05:54,530 --> 02:05:55,150 They can't control. 1507 02:05:55,830 --> 02:05:57,550 And they couldn't even fix it if they tried. 1508 02:05:57,910 --> 02:05:58,710 What is the goal with that? 1509 02:06:01,860 --> 02:06:02,520 Thank you, sir. 1510 02:06:03,600 --> 02:06:04,920 He's not going to answer that. 1511 02:06:05,160 --> 02:06:05,740 No, he's not going to. 1512 02:06:05,740 --> 02:06:06,780 This isn't a Q&A. 1513 02:06:06,780 --> 02:06:07,960 This is public comment. 1514 02:06:07,960 --> 02:06:13,240 I do want to make another comment and he's one of these people is my daughter and basically 1515 02:06:13,240 --> 02:06:16,500 your holder hostage so my patients with you is just about expired. 1516 02:06:21,200 --> 02:06:21,580 Okay. 1517 02:06:21,740 --> 02:06:23,420 Alicia Kuchinski. 1518 02:06:35,770 --> 02:06:37,030 Oh, my name is Alicia Kuchinski. 1519 02:06:37,350 --> 02:06:39,390 I'm a resident, and I have been sworn in. 1520 02:06:40,490 --> 02:06:45,910 I'm part of that 800 pound gorilla that was mentioned earlier in the workshop. 1521 02:06:46,770 --> 02:06:52,270 And the 800 pound gorilla isn't the rainwater, it's what Mr. Freely talked about. 1522 02:06:52,270 --> 02:07:00,490 It is the lawsuit and I so appreciate your time and your attention to detail but at this 1523 02:07:00,490 --> 02:07:02,550 point in time it's null and void. 1524 02:07:03,530 --> 02:07:09,290 How can you give a recommendation when so many people are being sued including the town 1525 02:07:09,290 --> 02:07:12,090 and including the county? 1526 02:07:13,590 --> 02:07:19,590 I spoke about this before about it being biased so if there's a movement that you need to 1527 02:07:19,590 --> 02:07:24,750 make. I have two dates for you that should be when you can make that. So next week, April 1528 02:07:24,750 --> 02:07:30,990 3rd, we have a mediation. If that is not settled during our mediation with everything, 1529 02:07:31,550 --> 02:07:39,610 our next date is June of 2026, and that is our trial. That's the point, if it goes to 1530 02:07:39,610 --> 02:07:47,090 that, that maybe then you can look to making a recommendation. Because the first thing 1531 02:07:47,090 --> 02:07:48,510 and this is on a broader context. 1532 02:07:48,950 --> 02:07:50,590 I'm looking at precedent here. 1533 02:07:53,300 --> 02:07:55,260 It is anyone's legal right to bring a lawsuit. 1534 02:07:56,200 --> 02:07:57,440 It just, it is. 1535 02:07:58,020 --> 02:08:01,600 And you know what, summer justifiable and summer legitimate 1536 02:08:02,100 --> 02:08:04,640 and summer frivolous and a tool of manipulation. 1537 02:08:05,360 --> 02:08:06,920 And that is not up to you to decide. 1538 02:08:07,580 --> 02:08:10,940 That is up to the legal courts to decide. 1539 02:08:11,400 --> 02:08:15,420 And until that's decided, you can't make a decision 1540 02:08:15,420 --> 02:08:23,480 because it is bias and it is inherently everything is clouded and that's not fair 1541 02:08:23,480 --> 02:08:32,220 to you for what you have to do. So I think at this point it needs to be clear to 1542 02:08:32,220 --> 02:08:40,260 any developer that comes along that filing maybe a frivolous lawsuit will not 1543 02:08:40,260 --> 02:08:45,040 get them what they want because if you still allow a recommendation to be 1544 02:08:45,040 --> 02:09:04,900 We made when things are not fully settled, it is open season on anyone, including the town again, including the county and including individual members of this community, who, as Mr. Frailey just said, have no control over the situation. 1545 02:09:06,280 --> 02:09:13,680 Personally, the second reason is, it's funny that Mr. Frailey said the term hostage, because that's exactly what I have written down. 1546 02:09:13,680 --> 02:09:20,140 I am stuck in this until 2026 and I'm already looking at that point because I cannot guarantee 1547 02:09:20,140 --> 02:09:23,120 that I can be out of this by next month. 1548 02:09:24,400 --> 02:09:31,260 I am a hostage here and I do not think it is fair and it is definitely not just that 1549 02:09:31,260 --> 02:09:37,380 crossing company and patricious simmers can in the meantime while I'm being held hostage 1550 02:09:37,380 --> 02:09:44,440 benefit from a situation that they created. It is neither fair and it is neither 1551 02:09:44,440 --> 02:09:44,700 just. 1552 02:09:47,050 --> 02:09:53,370 So with that, I don't know if I can refer to what was said earlier during 1553 02:09:53,370 --> 02:09:55,690 the workshop, am I allowed to address that, or is that all? 1554 02:09:57,070 --> 02:10:01,590 No, you can make a public comment. Okay. So one of the things that I just thought was 1555 02:10:01,590 --> 02:10:10,610 interesting. We keep talking about assistant living and wider areas because most people 1556 02:10:10,610 --> 02:10:17,090 in assistant living may need help getting out and that's great. And I love the idea 1557 02:10:17,090 --> 02:10:22,090 of a multi-generational, but the idea that a grandparent who is also an assistant living 1558 02:10:22,090 --> 02:10:30,510 can take care of younger kids doesn't really, it's not, it doesn't balance out. 1559 02:10:31,470 --> 02:10:34,070 The other thing is I understand a lot about Frederick County. 1560 02:10:34,390 --> 02:10:36,790 I've been a teacher at Frederick County for 28 years now. 1561 02:10:37,590 --> 02:10:42,290 And I was at Thermont Middle School as an eighth grade language arts teacher for 20 of those 1562 02:10:42,290 --> 02:10:42,490 years. 1563 02:10:43,770 --> 02:10:50,250 And there were times we were below capacity, and I still had 120 kids because just because 1564 02:10:50,250 --> 02:10:55,850 you have just because the space is there, it doesn't mean the educators are. 1565 02:10:57,910 --> 02:11:02,010 And I know that, and there are some of you on this board that know that as well. 1566 02:11:03,150 --> 02:11:08,410 So I just think that even though we're saying, oh there's the space, there's the, it's, 1567 02:11:09,410 --> 02:11:12,570 the numbers aren't practical for what actually happens. 1568 02:11:13,610 --> 02:11:14,690 So thank you again. 1569 02:11:14,970 --> 02:11:17,030 I appreciate your time, and I appreciate your effort. 1570 02:11:17,030 --> 02:11:26,910 But I will reiterate that it needs to be delayed until everybody is off. 1571 02:11:28,660 --> 02:11:34,050 Or this total legal situation is completed and finished. 1572 02:11:34,310 --> 02:11:37,130 And if that's 2026, that's 2026. 1573 02:11:37,570 --> 02:11:39,710 If I'm in it, they will be two. 1574 02:11:40,710 --> 02:11:41,270 Thank you. 1575 02:11:41,270 --> 02:11:41,850 I'm 1576 02:11:52,000 --> 02:11:57,000 Earl Maine resident off of Cody Drive and I've been sworn in. 1577 02:11:57,460 --> 02:11:59,380 Z-Wiz, I haven't got much to say now. 1578 02:12:01,520 --> 02:12:05,960 I'm going to dress up and it's a little minor compared to what just was said. 1579 02:12:08,160 --> 02:12:13,720 And mainly it's the, I can't speak too much for easy street, but it might be the same. 1580 02:12:13,940 --> 02:12:19,860 But Luther Drive, you currently cannot get two cars to pass. 1581 02:12:19,860 --> 02:12:27,740 on Luther Drive because there's parking on both sides of the street. If this is 1582 02:12:27,740 --> 02:12:34,200 extended through as a non, you know, as an actual street and not in emergency 1583 02:12:34,200 --> 02:12:41,560 access, there's going to be issues that you're going to have to deal with on the 1584 02:12:41,560 --> 02:12:47,880 town side going in. You're going to have to make it parking on only one side in 1585 02:12:47,880 --> 02:12:49,380 in order to get two guards to pass, 1586 02:12:50,280 --> 02:12:52,460 especially if you have parking on both sides, 1587 02:12:52,640 --> 02:12:54,140 and you do have emergency vehicles 1588 02:12:54,140 --> 02:12:56,080 that need to through that access, 1589 02:12:57,140 --> 02:12:58,420 you're not gonna get them through. 1590 02:12:59,720 --> 02:13:01,540 So it becomes a safety issue. 1591 02:13:06,280 --> 02:13:07,280 That's about all I got. 1592 02:13:08,480 --> 02:13:09,220 Thanks a lot. 1593 02:13:10,420 --> 02:13:11,160 Thank you. 1594 02:13:12,460 --> 02:13:13,180 Dan Twig. 1595 02:13:24,080 --> 02:13:25,540 Hello, my name's Dan Twig. 1596 02:13:25,880 --> 02:13:28,040 I am not a resident, but I'm a property owner 1597 02:13:28,040 --> 02:13:30,900 of the Albrecht Court II Condo Development, 1598 02:13:30,900 --> 02:13:37,580 and I have been sworn in. I have a couple of things I just want to just hit on it. I've already 1599 02:13:37,580 --> 02:13:46,880 been talked about in the preliminary traffic. I think Mr. Maine just he indicated very well that this 1600 02:13:47,920 --> 02:13:54,220 access to the development of a Luther is definitely not wide enough for traffic flow with cars 1601 02:13:54,220 --> 02:14:00,640 park on either side. He's absolutely right. Compounded that is Easy Street is 1602 02:14:00,640 --> 02:14:08,000 worse. It is not as wide as Luther. So Easy Street is even tighter and you're 1603 02:14:08,000 --> 02:14:11,940 only getting one car with cars parked on either side of Easy Street, which 1604 02:14:11,940 --> 02:14:17,780 there is, along the townhouses here and street parking here, you can only pass 1605 02:14:17,780 --> 02:14:24,200 one car. Now my concern is with this proposed development concept, if you 1606 02:14:24,200 --> 02:14:32,300 If you look at a broader picture, easy street of a North Carol extended would become a main 1607 02:14:32,300 --> 02:14:35,040 access point into the development. 1608 02:14:35,880 --> 02:14:43,180 Because people aren't going to want to go down Apple's Church to that entrance or most 1609 02:14:43,180 --> 02:14:48,000 traffic is not going to come off the Gracie and Apple's Church access road to access it there. 1610 02:14:48,000 --> 02:14:55,100 The North Carroll Street extension becomes the main access point because it's 1611 02:14:55,100 --> 02:14:59,840 closer to the assisted living facility. It's the best access the 1612 02:15:02,200 --> 02:15:29,780 So, you're accessing most points off of the easy street extension which becomes the main access in and out of that development which is the worst entrance to access the development. That's the main point. The second point is nobody's really addressing. We've talked about all of the intersections on Carroll Street and Apple's Church and Main Street all those intersections and the traffic impact of those intersections. 1613 02:15:29,780 --> 02:15:37,680 But what nobody is looking at is if that is true and traffic is truly impacted in all those intersections, 1614 02:15:38,340 --> 02:15:43,240 people are going to start looking for another access point or another easy and easy out. 1615 02:15:43,840 --> 02:15:50,940 My fear is that people start to go down here and they want to access the Apple's Church Graceham road, 1616 02:15:51,820 --> 02:15:57,200 which runs from there to Graceham intersection, which is a horrible intersection, 1617 02:15:57,200 --> 02:16:00,320 section you cannot see when you get to that great state of 1618 02:16:00,320 --> 02:16:05,720 intersection you cannot see going east. It's a blind 1619 02:16:05,720 --> 02:16:08,520 intersection but what people are going to want to do is they're 1620 02:16:08,520 --> 02:16:10,540 going to want to find an easier way to get to Walker'sville 1621 02:16:10,540 --> 02:16:15,920 Woodsburg Frederick. That becomes a very easy access point to 1622 02:16:15,920 --> 02:16:21,800 points south and east without with avoiding all the traffic 1623 02:16:21,800 --> 02:16:25,960 congestion that may be created in town. They're going to look 1624 02:16:25,960 --> 02:16:34,920 for an easier route. Grey's hand road is not. It's not. Basically designed for that 1625 02:16:34,920 --> 02:16:39,640 kind of traffic. I don't even think it's straight. I don't know. I don't even think it's 1626 02:16:39,640 --> 02:16:48,060 straight. Definitely not. It's very dangerous. So traffic is definitely still a main concern 1627 02:16:48,060 --> 02:16:53,170 for the approval of this concept plan. I don't think we've even touched on some of the 1628 02:16:53,170 --> 02:16:58,630 line areas of traffic we haven't even looked at or what could potentially become a problem. 1629 02:16:59,390 --> 02:17:05,330 But the other thing that Mr. Cross and his team have not even really talked about is 1630 02:17:05,990 --> 02:17:07,610 this is not a short-term project. 1631 02:17:09,010 --> 02:17:12,810 So they're talking about the impact of traffic and the traffic studies of traffic now. 1632 02:17:13,850 --> 02:17:19,230 But we've addressed this before, nobody's talking about the impact of the construction workers, 1633 02:17:19,230 --> 02:17:26,610 the construction vehicles, the equipment, the hauling in and out of materials that's going 1634 02:17:26,610 --> 02:17:31,170 to add to the construction to the traffic problems during the whole project. 1635 02:17:31,270 --> 02:17:32,590 This is not a one year or two year. 1636 02:17:32,830 --> 02:17:39,550 We're talking about a long term project, so the construction impact to traffic is going 1637 02:17:39,550 --> 02:17:40,750 to be huge. 1638 02:17:41,270 --> 02:17:46,210 You're talking about tractor trailers, big equipment, a lot of workers, a lot of just workers that 1639 02:17:46,210 --> 02:17:49,050 they're going to be also added to that traffic study. 1640 02:17:49,390 --> 02:17:52,270 They never even put that into the traffic study. 1641 02:17:52,910 --> 02:17:55,910 It was never mentioned, the impact of construction. 1642 02:17:58,170 --> 02:18:00,790 Now, and I'm chairman, so you hear question earlier. 1643 02:18:00,990 --> 02:18:02,150 I don't think you ever really got an answer. 1644 02:18:02,590 --> 02:18:05,110 I don't think Mr. Cross didn't understand the question. 1645 02:18:05,210 --> 02:18:06,450 He was just trying to avoid the question. 1646 02:18:06,750 --> 02:18:11,490 When you said, where can we go to see this type of development? 1647 02:18:12,930 --> 02:18:14,370 And he really didn't answer that. 1648 02:18:14,430 --> 02:18:15,710 Now as lawyer came up and said, there's 1649 02:18:15,710 --> 02:18:23,710 development of Frederick that has 600 and some units houses, whatever. But again, he 1650 02:18:23,710 --> 02:18:29,190 kind of avoided that question because it really isn't comparable to this. So where can 1651 02:18:29,190 --> 02:18:35,430 we go to see this? They really never answered that. I don't know. Where can you go to see 1652 02:18:35,430 --> 02:18:40,990 a site plan like this? They didn't really give us an answer to that. I will have to admit, 1653 02:18:40,990 --> 02:18:47,690 It, you know, Mr. Cross says he addressed this area right here along the county line 1654 02:18:48,410 --> 02:18:54,050 to the town line and that they eliminated the apartment complex that were built, that 1655 02:18:54,050 --> 02:18:57,250 were proposed in concept one to be put on top of this hill. 1656 02:18:58,850 --> 02:19:02,770 They did eliminate that and I appreciate him putting that thought into it. 1657 02:19:03,510 --> 02:19:09,790 It does eliminate those four story buildings, but the whole thought process behind that was 1658 02:19:09,790 --> 02:19:14,690 that's affordable housing. You addressed it. Where do we have affordable housing coming 1659 02:19:14,690 --> 02:19:15,550 into this development? 1660 02:19:18,180 --> 02:19:22,440 I understand that apartment buildings, you're not a property owner, 1661 02:19:22,620 --> 02:19:28,400 you're renting, so it doesn't offer some kind of affordable housing, yes, it does. But our 1662 02:19:28,400 --> 02:19:35,740 complaint was aesthetically from my house or from my condo, aesthetically, what would you see 1663 02:19:36,300 --> 02:19:41,020 from behind that, looking into that apartment building, 1664 02:19:41,120 --> 02:19:43,720 because that would be right in our next line of view 1665 02:19:43,720 --> 02:19:45,900 coming out, my window, the condo. 1666 02:19:46,840 --> 02:19:48,920 Aesthetically, that would not be pleasing at all. 1667 02:19:49,400 --> 02:19:51,240 Neither would it have been very aesthetically, 1668 02:19:51,600 --> 02:19:53,720 when you're looking from 15 or even out 1669 02:19:53,720 --> 02:19:56,800 to see that line of apartment buildings on top of that hill, 1670 02:19:57,060 --> 02:19:59,800 it's not what Thurman's about, if you ask me. 1671 02:20:00,480 --> 02:20:03,060 It's not what we represent, it's not what we want to represent. 1672 02:20:03,060 --> 02:20:04,180 That's what we want to look like. 1673 02:20:05,640 --> 02:20:09,460 This in its entirety is still a massive, massive, 1674 02:20:10,600 --> 02:20:11,700 dense development. 1675 02:20:12,280 --> 02:20:14,320 As he scaled it down from the original, 1676 02:20:14,320 --> 02:20:16,520 whatever it was, 170 some units to 100. 1677 02:20:17,120 --> 02:20:17,720 But is it now? 1678 02:20:18,820 --> 02:20:19,080 100? 1679 02:20:19,260 --> 02:20:19,540 Sure. 1680 02:20:20,540 --> 02:20:21,280 It is. 1681 02:20:21,660 --> 02:20:27,080 But you're still looking at a primary townhouse, 1682 02:20:27,680 --> 02:20:30,700 three-story home development. 1683 02:20:31,440 --> 02:20:36,460 now it has added the what he called the 11 single family homes again I 1684 02:20:36,460 --> 02:20:40,280 appreciate him doing that I did understand the concern of the people living 1685 02:20:40,280 --> 02:20:44,660 along Appleshurst Road we didn't want to see townhouses and three story 1686 02:20:44,660 --> 02:20:49,060 buildings right out our backyard now they're gonna see single family homes 1687 02:20:49,060 --> 02:20:54,280 there that wasn't compromised I appreciate him doing that but in the overall 1688 02:20:54,280 --> 02:21:00,140 concept of the whole plan it doesn't solve the issue of the mass development that 1689 02:21:00,140 --> 02:21:00,920 we're talking about putting in. 1690 02:21:01,400 --> 02:21:06,100 Now, going back to, as Mr. Cross eloquently put it, 1691 02:21:06,120 --> 02:21:10,020 the 800 pound gorilla in the room, my question is, 1692 02:21:11,120 --> 02:21:14,060 what he's telling us right now is this dorm water management 1693 02:21:14,700 --> 02:21:18,460 area for the Albert courts to and the Gateway community, 1694 02:21:21,000 --> 02:21:24,580 if he's allowed to put this in, then all of a sudden, 1695 02:21:25,020 --> 02:21:28,600 that becomes a non-issue problem solved. 1696 02:21:29,460 --> 02:21:38,160 It's taking care of. No more worries. If you allow me to do it. My question is, is if we say no right now, 1697 02:21:39,620 --> 02:21:47,200 what happens to that? Does that continue to go on into litigation from the town to the county, to the residents? 1698 02:21:48,220 --> 02:21:55,520 I mean, where does that end right now? He's kind of using that over our heads saying, oh no, you'll prove this and that goes away. 1699 02:21:55,520 --> 02:21:56,280 Hey, will they care that? 1700 02:21:56,840 --> 02:21:57,760 Will they care that? 1701 02:21:58,120 --> 02:22:00,520 That will become Albert Courts, too, 1702 02:22:00,600 --> 02:22:02,200 in the Gateway Community Store and Water Management 1703 02:22:02,200 --> 02:22:02,780 answer. 1704 02:22:05,590 --> 02:22:06,830 I'll agree with Ms. Consensi. 1705 02:22:06,930 --> 02:22:07,990 Don't hold that over my head. 1706 02:22:08,130 --> 02:22:09,070 Let's fix that first. 1707 02:22:10,130 --> 02:22:13,630 Let's resolve that first so that no matter what happens, 1708 02:22:14,190 --> 02:22:16,750 that isn't an issue with the town, with the county, 1709 02:22:16,930 --> 02:22:17,550 or the residents. 1710 02:22:19,490 --> 02:22:20,590 I mean, I don't understand. 1711 02:22:20,870 --> 02:22:23,410 I really don't understand how we could, like, 1712 02:22:23,710 --> 02:22:25,510 Ms. Consensi, how can we move forward 1713 02:22:25,510 --> 02:22:27,430 with that looming over our heads. 1714 02:22:28,450 --> 02:22:29,170 I don't understand. 1715 02:22:30,330 --> 02:22:32,830 The other issue is as far as we're concerned 1716 02:22:33,170 --> 02:22:35,810 that Mr. Crossbreed to my attention that the last meeting 1717 02:22:35,810 --> 02:22:38,590 that in a clause when this was originally, 1718 02:22:39,490 --> 02:22:41,470 when the easement was originally approved 1719 02:22:42,270 --> 02:22:47,210 and that stormwater management facility was agreed upon 1720 02:22:47,990 --> 02:22:51,410 with Miss Simmers, well, with Doc Simmers at the time, Kenneth 1721 02:22:52,050 --> 02:22:53,790 and the town and the county. 1722 02:22:54,830 --> 02:23:03,390 that that would be a complete stormwater management pond and upon completion that the maintenance 1723 02:23:03,390 --> 02:23:08,830 and care of that stormwater management facility would have been turned over to the Albert 1724 02:23:08,830 --> 02:23:16,590 Courts 2 community, Gateway Community and Albert Courts 2 condo association to maintain it. 1725 02:23:16,590 --> 02:23:21,730 Well as far as I know, that was never completed and it's entirely. 1726 02:23:22,730 --> 02:23:28,050 So, how can you hold that over the residents, the condo association, the gateway community? 1727 02:23:28,190 --> 02:23:32,030 How can you hold it over their heads to say, well, that has never been maintained? 1728 02:23:33,210 --> 02:23:35,050 The county hasn't been inspecting it. 1729 02:23:35,910 --> 02:23:38,910 How can we maintain something that was never completed? 1730 02:23:41,440 --> 02:23:42,080 It was never completed. 1731 02:23:42,200 --> 02:23:43,700 It was supposed to be an alternative plan. 1732 02:23:43,860 --> 02:23:45,520 Okay, this was a three year agreement. 1733 02:23:45,520 --> 02:23:49,080 we had a three-year agreement, you can use it, but there's going to either have to be 1734 02:23:49,080 --> 02:23:56,040 a provision that that becomes the permanent facility or another facility is developed 1735 02:23:56,600 --> 02:24:01,360 and completed and then turned over to the Albert Courts too in the community. 1736 02:24:01,880 --> 02:24:02,700 That was never done. 1737 02:24:03,840 --> 02:24:10,060 So once again, how can we hold the residents, the property owners, how can we hold them responsible, 1738 02:24:10,060 --> 02:24:21,780 How can we sue somebody that has no say in the maintenance or the care or the ongoing process of that stored modern management? 1739 02:24:22,400 --> 02:24:32,020 My recommendation to the committee is just like Ms. Cousinsi's head, we don't move forward with this until this whole 800 pound gorilla is resolved. 1740 02:24:32,900 --> 02:24:38,080 That would be my recommendations to you guys as the planning and zoning commission. 1741 02:24:39,000 --> 02:24:45,800 I'm sorry until we know the answer to this, not only now, but moving forward, if this 1742 02:24:45,800 --> 02:24:51,560 is or is not approved, where do we go with that storm water management? 1743 02:24:54,550 --> 02:24:58,870 I do want to make one other exception, he said about the hammock or hills development 1744 02:24:59,790 --> 02:25:03,370 and the price of housing up there and this is going to be much more affordable. 1745 02:25:03,370 --> 02:25:10,130 So I have yet to see a home on Handmaker Hills come anywhere close to $550,000. 1746 02:25:10,750 --> 02:25:12,670 I watch the real estate listings all the time. 1747 02:25:12,830 --> 02:25:15,310 They're here between $490,000, $50,000. 1748 02:25:15,370 --> 02:25:19,410 That's a lot of money, but I haven't seen anything come close to $550 up there. 1749 02:25:20,390 --> 02:25:24,030 And where he got the number that they're going to go to $590,000? 1750 02:25:24,030 --> 02:25:24,650 I have no idea. 1751 02:25:24,910 --> 02:25:26,510 Unless he knows a realtor that I don't know. 1752 02:25:26,930 --> 02:25:30,570 I know a lot of realtors in areas, nobody's told me they're going to shoot up to $600,000. 1753 02:25:31,450 --> 02:25:38,030 and also when he talks about the three-story townhomes I know my son has a 1754 02:25:38,030 --> 02:25:42,450 three-story townhome on Lake and Leckler there. Those three-story townhomes are 1755 02:25:42,450 --> 02:25:49,270 now 350, 360,000 that's realistic so that's the kind of prices that you're 1756 02:25:49,270 --> 02:25:55,470 talking about for this development with all these three-story townhomes that's 1757 02:25:55,470 --> 02:25:59,430 That's the price of houses, like it or not, that's a reality. 1758 02:26:01,230 --> 02:26:07,330 But I mean, I think you're attracting the right kind of people, I don't want to say 1759 02:26:07,330 --> 02:26:11,770 the wrong kind of people on the other end, but people that are responsible enough to purchase 1760 02:26:11,770 --> 02:26:14,190 a $360,000 home, 1761 02:26:16,360 --> 02:26:20,400 I think they're responsible enough to maintain and take care of a community. 1762 02:26:20,680 --> 02:26:23,880 So anyway, that's all I have to say. 1763 02:26:24,140 --> 02:26:24,780 Thank you for your time. 1764 02:26:25,200 --> 02:26:25,340 Thank you. 1765 02:26:25,340 --> 02:26:25,400 Thank you. 1766 02:26:25,540 --> 02:26:25,820 Thank you. 1767 02:26:29,630 --> 02:26:30,830 Matt, toll. 1768 02:26:36,650 --> 02:26:37,250 Keeney? 1769 02:26:37,250 --> 02:26:37,590 Keeney? 1770 02:26:38,490 --> 02:26:39,910 Sorry if I said your name wrong. 1771 02:26:40,490 --> 02:26:41,010 That's okay. 1772 02:26:42,150 --> 02:26:43,230 Happens all the time. 1773 02:26:44,090 --> 02:26:45,250 Good evening, everybody. 1774 02:26:46,090 --> 02:26:47,410 My name is Ruth Haney. 1775 02:26:47,850 --> 02:26:49,310 Yes, I'm a resident. 1776 02:26:49,610 --> 02:26:51,110 And yes, I did get sworn in. 1777 02:26:52,410 --> 02:26:59,390 I listened to your comments from 6 o'clock on, then scurried up here. 1778 02:27:00,550 --> 02:27:09,610 So what I have to say is also going to be given some feedback to what you all just said. 1779 02:27:10,190 --> 02:27:17,690 So it might be a big of a patchwork quilt and I'll try to make it come all together so that you'll understand it a little bit better. 1780 02:27:18,570 --> 02:27:22,630 I'm going to start out with something new. I'm giving an approach from a different angle. 1781 02:27:23,390 --> 02:27:25,130 I'm going to say thank you to someone. 1782 02:27:25,130 --> 02:27:29,490 I'm going to say thank you to each of you for the time that you've given. 1783 02:27:30,270 --> 02:27:34,730 I'm going to thank the staff over there, Kelly Doody. 1784 02:27:35,270 --> 02:27:39,050 I asked her if it was long time ago, Kelly. 1785 02:27:40,170 --> 02:27:44,230 I sent her an email and she immediately got back to me. 1786 02:27:44,450 --> 02:27:45,390 I appreciate that. 1787 02:27:46,950 --> 02:27:52,230 And I think that her purple blob slide is absolutely wonderful. 1788 02:27:52,750 --> 02:27:53,450 So keep it up. 1789 02:27:54,190 --> 02:28:00,850 I would request that if somehow you could make that be turned a little bit, because 1790 02:28:00,850 --> 02:28:06,670 I sat there and have not been able to see exactly where the people were pointing to. 1791 02:28:07,350 --> 02:28:13,970 I see the exit sign, which is over here, and if somehow you could get it so that everybody 1792 02:28:13,970 --> 02:28:15,470 could see it, that would be helpful. 1793 02:28:17,070 --> 02:28:20,050 Okay, now I said I would start with the good things. 1794 02:28:20,710 --> 02:28:25,950 I'm going to give a shout out to a commissioner, and he's not here tonight, but I want to do it. 1795 02:28:26,970 --> 02:28:34,930 And this commissioner said something in the March 4th meeting that he needs to be applauded for. 1796 02:28:35,850 --> 02:28:42,310 And I'm going to give you what he said, this was said in public, and I'm saying this is a resident. 1797 02:28:44,130 --> 02:28:52,650 This is what he said. Mr. Cross asked to meet with me privately. I have no intention 1798 02:28:52,650 --> 02:28:59,670 of meeting with the developer ever privately. It can be in a public meeting and that is 1799 02:28:59,670 --> 02:29:01,010 where business is done. 1800 02:29:03,340 --> 02:29:09,040 I want him to know how much I appreciate that. He did the right 1801 02:29:09,040 --> 02:29:14,500 Right thing for agreeing not to meet with Mr. Cross in a private setting concerning any 1802 02:29:14,500 --> 02:29:21,640 comments dealings with Zimmer's property because development and thermont requires transparency. 1803 02:29:22,440 --> 02:29:25,880 And this is what we're doing tonight and it is great. 1804 02:29:26,500 --> 02:29:27,420 So thank you. 1805 02:29:28,080 --> 02:29:37,200 I want to thank the chairperson for her insistence to continue to get the goodwill, so 1806 02:29:37,200 --> 02:29:42,480 local issue solved instead of waiting for another night. I thought that was 1807 02:29:42,480 --> 02:29:53,400 well done. Thank you. Now back to Zimmer's property. On the the Miss Meredith 1808 02:29:53,400 --> 02:29:59,760 with ask if what we have now would be interfered with some develop. 1809 02:30:00,000 --> 02:30:10,460 Yes, easy street, as other people are saying, cannot have two cars going out at the same time. 1810 02:30:10,820 --> 02:30:23,500 You've got to have one car going up. The same thing with Lucer. There is not space enough for two cars to be in that the same time. There is parking on the side. 1811 02:30:24,480 --> 02:30:33,160 And that goes to the comment made by someone, I don't know who it was, that there is the 1812 02:30:33,160 --> 02:30:38,200 ambulances, they are stretched enough as it is. 1813 02:30:38,880 --> 02:30:45,880 So if we try to get ambulances in those narrow streets, it might be a little dicey, and 1814 02:30:45,880 --> 02:30:47,060 I'm concerned with that. 1815 02:30:47,060 --> 02:30:57,740 I'm also concerned if we start to get those streets being used as another way to get around to the development, 1816 02:30:58,460 --> 02:31:07,200 that that alley that is behind the 117 building will become a racetrack. 1817 02:31:07,800 --> 02:31:12,920 We already have people who come there and do not pay any attention to, 1818 02:31:12,920 --> 02:31:19,980 This is private property. Please do not come. They come anyhow and that I think will increase. 1819 02:31:20,980 --> 02:31:33,420 I also wanted to add to the traffic study and the town planner was great with what you remembered. 1820 02:31:34,520 --> 02:31:43,740 There is, you do need to put in that traffic study at the easy street intersection of North 1821 02:31:43,740 --> 02:31:48,460 Carroll Street at the truck entrance to NVR. 1822 02:31:49,600 --> 02:31:55,180 You go down to that truck entrance and there is constant traffic. 1823 02:31:56,040 --> 02:32:04,510 That is why North Carroll Street is a pothole and if we have more construction that will get 1824 02:32:04,510 --> 02:32:04,910 worse. 1825 02:32:07,740 --> 02:32:10,580 So please think about that when you're doing that. 1826 02:32:13,220 --> 02:32:16,440 Let's see. I did that, did 1827 02:32:16,440 --> 02:32:16,720 that. 1828 02:32:21,200 --> 02:32:31,280 Now the questions that I had and looking at this were answered semi. I would 1829 02:32:31,280 --> 02:32:39,460 like for that 800 pound gorilla could get done to get cleared by 2026. I don't 1830 02:32:39,460 --> 02:32:46,380 think any of us won't go into litigation. That's not what we want. We want it to be 1831 02:32:46,380 --> 02:32:54,740 solved so that those people who are responsible get held responsible. We are 1832 02:32:54,740 --> 02:33:00,140 not responsible for that whole. We didn't dig it and we're not responsible for 1833 02:33:00,140 --> 02:33:05,980 taking care of it. So I don't want to go to litigation and I'm thinking it 1834 02:33:05,980 --> 02:33:14,560 else does. So please think about what Mr. Twig was saying and about what I've just said 1835 02:33:15,560 --> 02:33:23,340 and I appreciate what Alicia said but most of all I appreciate what you've done 1836 02:33:24,180 --> 02:33:32,680 and I hope that in a couple of months or maybe before 2026 this can be done with 1837 02:33:33,280 --> 02:33:38,980 and those people who want to sell, and by the way, there have been people who 1838 02:33:38,980 --> 02:33:43,980 have bought units there. They're not afraid of that lawsuit because they can 1839 02:33:43,980 --> 02:33:49,540 pay cash. You can still buy if you pay cash, but if you have to go through a 1840 02:33:49,540 --> 02:33:57,100 broker, then that's a different issue. Okay? So I hope that before 2026, that this 1841 02:33:57,100 --> 02:34:07,500 can be done with to everyone's willing to cooperate, but that means that you've got 1842 02:34:07,500 --> 02:34:11,960 to be transparent and you take responsibility for what you did. 1843 02:34:12,740 --> 02:34:13,340 Thank you. 1844 02:34:14,320 --> 02:34:14,840 Thank you. 1845 02:34:15,760 --> 02:34:16,660 James Clark. 1846 02:34:21,290 --> 02:34:22,010 I had Stanfield. 1847 02:34:30,840 --> 02:34:31,780 I've got a cold. 1848 02:34:32,000 --> 02:34:33,180 So I'm pretty croaky. 1849 02:34:33,840 --> 02:34:35,700 Probably contaminate the bike. 1850 02:34:35,700 --> 02:34:44,440 Ed Standfield, I'm not a resident, I'm from Middletown, I am a realtor, I'm a sort sworn 1851 02:34:44,440 --> 02:34:44,640 in. 1852 02:34:45,500 --> 02:34:55,320 I represent Miss Simmers as a listing agent, and so I feel very protective of her. 1853 02:34:56,340 --> 02:35:04,360 And her request is that if people could be a little more civil to her, whenever she goes 1854 02:35:04,360 --> 02:35:10,700 out. She really appreciated it. She said people don't try to shun her front yard. She said 1855 02:35:12,020 --> 02:35:20,880 people run across her lawn with cars and it may be kids. I don't know. She gets harassing phone 1856 02:35:20,880 --> 02:35:28,580 calls. She's not, she always checks to see who's calling now. When she goes out grocery shopping, 1857 02:35:28,580 --> 02:35:30,280 and she only states somebody with her 1858 02:35:30,820 --> 02:35:34,920 because of very uneasy on what somebody may say to her. 1859 02:35:35,400 --> 02:35:38,460 So her request, if he could be more considerate, 1860 02:35:39,100 --> 02:35:40,920 she's just trying to sell her ground 1861 02:35:41,360 --> 02:35:45,100 like she feels she should be able to. 1862 02:35:45,900 --> 02:35:47,340 That's one point. 1863 02:35:47,540 --> 02:35:50,000 The other point, from a realtor's point of view, 1864 02:35:50,700 --> 02:35:54,700 is you all know the prices of housing 1865 02:35:55,340 --> 02:36:01,620 is partly because of being scarce and it's a country we're a wide phenomena and we've 1866 02:36:01,620 --> 02:36:10,280 seen it in this area for many years now. It has not led up. Scaresty of housing causes 1867 02:36:10,280 --> 02:36:13,040 pricing to go up as you know, supply and demand. 1868 02:36:17,140 --> 02:36:21,040 Home based in Frederick, so I think people 1869 02:36:21,040 --> 02:36:26,040 coming out of Montgomery County can't afford that if you can't afford Frederick, I end up 1870 02:36:26,040 --> 02:36:30,240 in Thurmont, Myersville, Washington County, Pennsylvania, 1871 02:36:30,760 --> 02:36:33,300 and if you can't afford that, I'm over in West Virginia, 1872 02:36:33,800 --> 02:36:35,440 so I'm stepping around Bartonsburg. 1873 02:36:38,380 --> 02:36:41,160 I've sold a lot of houses here in Thurmont 1874 02:36:41,160 --> 02:36:44,180 over the years, and people love Thurmont. 1875 02:36:44,380 --> 02:36:47,860 It loved to settle here, comes down to affordability, 1876 02:36:48,460 --> 02:36:53,520 and subdivision like this would just help considerably 1877 02:36:53,520 --> 02:37:02,980 considerably on supply. The other thing I've seen change is first-time home buyers who 1878 02:37:02,980 --> 02:37:09,400 used to always be in their 20s now seem to be in their 30s because of affordability. 1879 02:37:10,200 --> 02:37:15,720 After wait longer, try to save longer. Meanwhile, save like a maniac. Meanwhile, the prices 1880 02:37:15,720 --> 02:37:25,280 keep going up. So I'm all for a subdivision like this. I understand concerns because I work 1881 02:37:25,280 --> 02:37:30,180 those sides by our Zant sellers affordable 1882 02:37:32,320 --> 02:37:37,300 or whatever you label to pick it on at least 1883 02:37:37,300 --> 02:37:43,780 it's not the really jacked up high price. The large percentage of people can't afford. The other 1884 02:37:43,780 --> 02:37:48,000 The point is youth make any community. 1885 02:37:48,120 --> 02:37:50,980 If you don't have youth coming up, whether it be housing, 1886 02:37:51,460 --> 02:37:57,700 churches, schools, or always a site of good things coming. 1887 02:37:59,460 --> 02:38:02,420 The comparative issue you always use is Cumberland. 1888 02:38:04,880 --> 02:38:08,960 I guess you all heard six months ago where they were given away $10,000 1889 02:38:09,620 --> 02:38:13,380 just to get people to move up there to go towards their closing cost. 1890 02:38:14,100 --> 02:38:20,760 And that's what happens to any of this, not growing, it's shrinking, it's not good. 1891 02:38:21,740 --> 02:38:26,820 Wild growth is one thing, but modern growth is much better, I think, you know, some 1892 02:38:26,820 --> 02:38:29,140 divisions like this, I think, will help along that. 1893 02:38:31,690 --> 02:38:38,710 And rather than trying to call them as simmers, if you want to call me out, I'll listen, as 1894 02:38:38,710 --> 02:38:42,710 I have in all these meetings, she's afraid to come to these meetings for 1895 02:38:43,830 --> 02:38:46,110 afraid that whatever. 1896 02:38:46,950 --> 02:38:48,350 You know, it's psychological. 1897 02:38:49,290 --> 02:38:50,570 Like the world's against you. 1898 02:38:50,910 --> 02:38:52,550 And I don't think that's true. 1899 02:38:53,210 --> 02:38:53,910 Thank you. 1900 02:38:54,490 --> 02:38:54,970 Thank you. 1901 02:38:56,390 --> 02:38:57,230 Thank you. 1902 02:38:57,370 --> 02:38:57,950 Craig is gone. 1903 02:38:59,210 --> 02:39:01,010 That is all who has signed up. 1904 02:39:01,150 --> 02:39:05,050 Is there anybody that is not on the sheet that would like to speak? 1905 02:39:05,050 --> 02:39:10,350 sort of start with the lady up here in the green and black shirt view with the ponytail 1906 02:39:11,330 --> 02:39:16,390 Please state your name if you're a resident and if you've been sworn in or not. I'm Christine Johnson 1907 02:39:16,390 --> 02:39:24,330 I am a resident. I live in abort courts. I am actually the homeowner's association vice president and I have not been sworn in 1908 02:39:26,070 --> 02:39:27,550 Please raise your right hand 1909 02:39:29,050 --> 02:39:34,670 Do you solemnly swear or affirm that the response is given in statements made in this hearing before the planning commission? 1910 02:39:34,670 --> 02:39:37,190 and will be the whole truth and nothing but the truth, 1911 02:39:37,310 --> 02:39:38,390 if so answer I do. 1912 02:39:38,670 --> 02:39:39,530 I do, thank you. 1913 02:39:39,930 --> 02:39:40,090 Hello. 1914 02:39:40,830 --> 02:39:43,270 OK, so I haven't, I was sick last morning, 1915 02:39:43,510 --> 02:39:44,250 so I couldn't come in. 1916 02:39:45,510 --> 02:39:47,990 Basically, first, I'm a single mom. 1917 02:39:49,430 --> 02:39:55,550 And it's very easy for people nowadays, most people 1918 02:39:55,550 --> 02:39:57,710 are divorced, or they don't stay married long. 1919 02:39:58,010 --> 02:39:59,330 And I mean, seriously, you can look it up. 1920 02:39:59,850 --> 02:40:04,250 But affording a house on my house, 1921 02:40:04,250 --> 02:40:10,910 I was I've been here four years only four years and I am hostage. I can't sell my house. I can't do 1922 02:40:10,910 --> 02:40:17,930 anything. I have to stay here because of this man because it's something that I have no control 1923 02:40:17,930 --> 02:40:21,090 over or didn't have any control over years ago. 1924 02:40:23,510 --> 02:40:27,990 Traffic. That's a huge issue for me. I've actually even 1925 02:40:27,990 --> 02:40:35,370 contacted the police station about how fast the truck drivers and people drive 1926 02:40:35,370 --> 02:40:39,090 through there and they can't even get down on my carol, down where NBR is where 1927 02:40:39,090 --> 02:40:44,410 I am. You can't get through. If a truck is coming through and they have all 1928 02:40:44,410 --> 02:40:49,330 of their construction stuff on there including, you know, to go down, one 1929 02:40:49,330 --> 02:40:54,210 car gets through. Even though that road is wide, they took out our mailbox and it 1930 02:40:54,210 --> 02:40:55,210 We took them, how many months? 1931 02:40:55,590 --> 02:40:58,450 Oh, it's just six months maybe, maybe even longer 1932 02:40:59,190 --> 02:40:59,910 to get it in. 1933 02:41:01,590 --> 02:41:03,170 It is ridiculous. 1934 02:41:03,830 --> 02:41:05,730 The amount of traffic we have on that already 1935 02:41:05,730 --> 02:41:06,990 because of the trucks. 1936 02:41:07,770 --> 02:41:10,290 There's got to be a different access point 1937 02:41:10,290 --> 02:41:12,310 if this is even to be considered. 1938 02:41:14,150 --> 02:41:17,310 You can't get down where are the people of the residents that 1939 02:41:17,310 --> 02:41:21,330 are in our townhouse is going to park down easy street 1940 02:41:21,330 --> 02:41:22,570 or Luther street. 1941 02:41:22,570 --> 02:41:26,970 There's room for one parking spot at our townhouses in our driveway. 1942 02:41:27,410 --> 02:41:32,530 If you are married or you do have people living with you, which a lot of us do, including 1943 02:41:32,530 --> 02:41:39,310 family or your kids, you know, my kids are 25 and 22 now, and you know, they have to 1944 02:41:39,310 --> 02:41:39,990 park on the street. 1945 02:41:40,290 --> 02:41:45,530 There's not enough parking for us alone for a four person family. 1946 02:41:46,090 --> 02:41:48,590 As your kids grow, you're going to have four cars. 1947 02:41:49,290 --> 02:41:50,290 Where are they going to park? 1948 02:41:51,570 --> 02:41:52,370 We're going to do it. 1949 02:41:52,790 --> 02:41:56,830 Are we going to, we can't widen it because we own that property. 1950 02:41:57,690 --> 02:42:01,730 You pull, I mean, unless you take out the sidewalks, which you can't do, you can't take 1951 02:42:01,730 --> 02:42:02,090 them out. 1952 02:42:05,030 --> 02:42:11,010 Secondly, I actually have contacted Maryland State about the traffic light here in town. 1953 02:42:11,410 --> 02:42:14,410 I don't know how many other people have, but I have been one of them. 1954 02:42:15,070 --> 02:42:18,090 They could not do anything about the traffic in the morning. 1955 02:42:18,090 --> 02:42:20,530 Okay, how many cars do we have down at that intersection? 1956 02:42:21,330 --> 02:42:28,930 It takes me 15 to 20 minutes to get out of town to get to 15, which is an exception. 1957 02:42:29,130 --> 02:42:34,610 The one down, the light over the square at the square, at the square. 1958 02:42:35,110 --> 02:42:39,770 So you have all these schools coming in, we barely, the truck drivers can't go down that 1959 02:42:39,770 --> 02:42:41,330 road as it is because they can't turn. 1960 02:42:41,950 --> 02:42:48,670 So you're going to add all this traffic to a, they won't, the state won't even change the lights. 1961 02:42:49,490 --> 02:42:55,630 They won't change. I was like, make it one direction, you know, out of time because people cannot turn. 1962 02:42:56,250 --> 02:42:59,670 You've got so many people going one way. People cannot turn another direction. 1963 02:43:00,190 --> 02:43:04,310 So you get stuck. I get stuck for like 15 minutes just to get to 15. 1964 02:43:04,910 --> 02:43:11,310 I don't want to have to go down all the way through town. I moved up here from Walker's Boat because I loved the area. 1965 02:43:12,590 --> 02:43:18,870 the one thing I hate is the traffic. I absolutely cannot stand it and that's why I 1966 02:43:18,870 --> 02:43:22,590 called. But they said that it would actually the timing of it or something it 1967 02:43:22,590 --> 02:43:27,470 would make it a lot worse, which to me I don't see how that's possible at this 1968 02:43:27,470 --> 02:43:31,930 point. But do you go adding a whole bunch of people to this town, you know, and then 1969 02:43:31,930 --> 02:43:37,610 the realtor that was here was just talking about modern growth. Okay, well what 1970 02:43:37,610 --> 02:43:41,110 about all these houses where people were not going to be in anymore because they're 1971 02:43:41,110 --> 02:43:45,210 leaving because they're old. They need to be renovated. We don't need modern 1972 02:43:45,210 --> 02:43:49,330 growth. We need to renovate the town. You guys are putting in what? How many 1973 02:43:49,330 --> 02:43:55,930 apartments are going on the square? Yeah, I mean, and not alone. That is 1974 02:43:55,930 --> 02:44:00,510 renovating. We need to make the town better. We need to renovate what's already 1975 02:44:00,510 --> 02:44:07,270 here and not add. My house is over $300,000 on a single income and mind you, I've 1976 02:44:07,270 --> 02:44:11,030 worked for the federal government in the National Cancer Institute. My 1977 02:44:11,030 --> 02:44:18,630 jobs on the line. How am I going to forward my house as one person? You know, it doesn't 1978 02:44:18,630 --> 02:44:26,310 make sense to me to put in something that is going to actually be more detrimental per 1979 02:44:26,310 --> 02:44:32,350 person, per this town. It might bring us money, but at the same time, you're going to lose 1980 02:44:32,350 --> 02:44:37,650 residents. As soon as this crap is over with, and we finally, hopefully, I mean, I can barely 1981 02:44:37,650 --> 02:44:44,610 afford what I have to pay my lawyer to get me out of this. I mean I'm paying two college bills 1982 02:44:44,610 --> 02:44:50,750 plus everything else. You've got people who, you know, are first-time home buyers in our association 1983 02:44:51,370 --> 02:44:59,830 who are struggling as it is. And that's on a $300,000 house with two incomes coming in. How are 1984 02:45:00,110 --> 02:45:29,210 We're going to put this many people in here and say, oh, it's growth. No, we need to fix what we already have. You go down the street, you see the houses, you see how they're, you know, they're not up kept as well as they could be. They're beautiful. Why not put that money towards something that is there? What are you going to do when this house is fall down? Is it going to be you go down the street? And we're going to just look at, you know, houses that are on the ground? I mean, it doesn't make sense to me. There was something else that I care. 1985 02:45:29,210 --> 02:45:38,310 I'm sorry but yeah I per me per whatever everything Alicia said you know we're 1986 02:45:38,310 --> 02:45:43,810 getting sued like four times you know I have the homeowners association that's 1987 02:45:43,810 --> 02:45:48,190 being sued that I have to put money out just for that I have to put money out 1988 02:45:48,190 --> 02:45:52,350 for me myself and I've only been here four years what are the heck am I being 1989 02:45:52,350 --> 02:45:56,690 held accountable for something I wasn't even I wasn't even alive probably but 1990 02:45:56,690 --> 02:46:06,290 this was built honestly I don't even know it's like to me and like Alicia said if we don't come 1991 02:46:06,290 --> 02:46:13,930 to some agreement or whatever come April 3rd we're stuck paying more to our lawyers we can lose 1992 02:46:13,930 --> 02:46:19,490 our houses our houses can be foreclosed because some of us might not have jobs our economy is screwed 1993 02:46:19,490 --> 02:46:26,750 right now this is not gonna help when people can't afford anything at the moment you go to the grocery 1994 02:46:26,750 --> 02:46:33,930 grocery store. You've got $200 worth of groceries. What you used to cost is a hundred. You know, I can't, I can't 1995 02:46:34,870 --> 02:46:45,010 reiterate enough that until this is over. And I mean, 2026 is a long ways away. That's over a year. It's like June. It's over a year and a 1996 02:46:45,010 --> 02:46:54,950 half away to have to keep paying our lawyer to deal with this company. Why? Why are we being held accountable and you guys are 1997 02:46:54,950 --> 02:46:59,370 being held accountable to and you're going to let this person come in and make 1998 02:46:59,370 --> 02:47:04,670 millions. Where's it going in your pockets because you guys have to put out 1999 02:47:04,670 --> 02:47:07,170 just as much as we do to fight him. Thank you. 2000 02:47:09,310 --> 02:47:09,790 Thank you. 2001 02:47:12,730 --> 02:47:15,850 Here's next sir. Please 2002 02:47:15,850 --> 02:47:18,850 state your name if you're a resident and if you've been sworn in or not. 2003 02:47:21,180 --> 02:47:21,620 Hello 2004 02:47:21,620 --> 02:47:29,700 Tyler Romero and resident of upper courts as well. I'm also not going to be 2005 02:47:31,580 --> 02:47:34,600 just to go on more information that we did not have last time. 2006 02:47:34,740 --> 02:47:35,700 Sorry, sorry, were you sworn in? 2007 02:47:35,880 --> 02:47:36,340 Sorry, yes. 2008 02:47:36,600 --> 02:47:37,620 Thank you. 2009 02:47:37,940 --> 02:47:41,160 More information than we had on January was mentioned 2010 02:47:41,160 --> 02:47:44,380 the medical services or the ambulances that we have available. 2011 02:47:45,120 --> 02:47:48,600 And so how they're really stressed out now already. 2012 02:47:49,320 --> 02:47:51,700 So I live because it numbers courts 2013 02:47:51,700 --> 02:47:52,960 and I have a direct view of Luther. 2014 02:47:53,640 --> 02:47:55,000 And I'm fortunate to work at home. 2015 02:47:55,840 --> 02:47:59,020 So I do see frequently ambulances go in 2016 02:47:59,020 --> 02:48:02,980 and out about the, like, over here, the, I guess, 2017 02:48:03,120 --> 02:48:06,880 elderly condominiums, and it's not in frequent. 2018 02:48:07,100 --> 02:48:10,220 It's probably, like, maybe once a week, maybe twice a week. 2019 02:48:10,680 --> 02:48:12,440 I mean, it's not, you know, emergencies where they're, 2020 02:48:12,620 --> 02:48:14,000 like, splaring, but they're picking up people 2021 02:48:14,000 --> 02:48:16,460 or moving people with the town's ambulances. 2022 02:48:17,000 --> 02:48:19,020 And so I can only imagine that's going to get, you know, 2023 02:48:19,360 --> 02:48:23,740 as more people that are involved with being 2024 02:48:23,740 --> 02:48:24,940 getting the ambulance services with, you know, 2025 02:48:25,040 --> 02:48:26,140 obviously way more houses. 2026 02:48:26,540 --> 02:48:28,160 But more importantly, with the assisted living, 2027 02:48:28,160 --> 02:48:32,680 It's going to be a lot of stress, not just like, you know, we talk about having, oh, there's 2028 02:48:32,680 --> 02:48:36,280 more communities being built around Thermont, you know, your average person doesn't need 2029 02:48:36,280 --> 02:48:36,920 the ambulance at all. 2030 02:48:37,180 --> 02:48:39,940 But as this is living, we'll need the ambulance quite often. 2031 02:48:40,400 --> 02:48:44,240 So I can only imagine that, you know, basically, I just wanted to make sure to reiterate that 2032 02:48:44,240 --> 02:48:49,220 they are very stressed, and it will be a lot more impact on our emergency services that, you 2033 02:48:49,220 --> 02:48:51,000 know, we already don't have the capacity for it. 2034 02:48:57,680 --> 02:48:58,080 Louise? 2035 02:49:07,400 --> 02:49:07,600 Okay. 2036 02:49:07,860 --> 02:49:08,860 So I'm Louise Schaefer. 2037 02:49:08,940 --> 02:49:10,540 I'm from Thermont, but I haven't been sworn in. 2038 02:49:10,540 --> 02:49:12,460 All right. 2039 02:49:12,940 --> 02:49:13,860 Raise your right hand. 2040 02:49:15,120 --> 02:49:22,320 Do you solemnly swear or firm that the response is given and statements made in the hearing before the planning commission will be the whole truth? 2041 02:49:22,740 --> 02:49:24,740 And nothing but the truth if so answer I do. 2042 02:49:25,700 --> 02:49:25,960 Thank you. 2043 02:49:26,880 --> 02:49:27,360 Okay. 2044 02:49:27,880 --> 02:49:32,320 I also am going to talk about the Easy Street and Luther Drive. 2045 02:49:32,320 --> 02:49:41,040 The density of the business traffic, employees, tractor trailers, delivery trucks, and 2046 02:49:41,040 --> 02:49:43,940 the single lane of traffic on Easy Street and Luther Drive. 2047 02:49:44,660 --> 02:49:50,820 Our community has traffic from 152 homes along with this commercial business traffic. 2048 02:49:51,400 --> 02:49:54,280 We don't need cohesiveness and connectivity. 2049 02:49:55,140 --> 02:49:58,560 We don't need interconnecting streets with another community. 2050 02:49:58,560 --> 02:50:02,320 and we don't want an emergency access gate only through drive. 2051 02:50:03,300 --> 02:50:08,680 These opening these streets is not essential to this development, so please understand 2052 02:50:09,140 --> 02:50:11,840 that we don't need more traffic in our community. 2053 02:50:14,190 --> 02:50:17,730 Also we currently have 116 homes in the pipeline. 2054 02:50:18,410 --> 02:50:25,210 This development would immediately add 100 homes, making a total of 216 new homes. 2055 02:50:26,270 --> 02:50:31,550 4 of the developments haven't broken ground, 3 of these developments are on the northern 2056 02:50:31,550 --> 02:50:35,270 side of town and may use some of the same roads as this development. 2057 02:50:36,330 --> 02:50:43,150 Luther Drive, Carroll Street, Woodside, Apple Search Road, and Euler Road are all the 2058 02:50:43,150 --> 02:50:47,170 streets and roads that support our courts and its new development. 2059 02:50:47,930 --> 02:50:53,870 This is a mixture of secondary roads, roads and streets that lack sidewalks and streets that 2060 02:50:53,870 --> 02:50:58,510 need major repairs such as carol street, which is our main artery into this community. 2061 02:51:00,920 --> 02:51:04,080 Emergency electric and water repairs are getting more frequent. 2062 02:51:04,680 --> 02:51:10,200 We have a major issue with PFAS in our water, and we are still in a drought situation that 2063 02:51:10,200 --> 02:51:11,220 may not get better. 2064 02:51:12,480 --> 02:51:17,640 A well that would serve this development has been taken offline because of PFAS contamination. 2065 02:51:19,040 --> 02:51:24,800 Planning is only, only looks at the development at one at a time and not the totality of 2066 02:51:24,800 --> 02:51:30,680 the developments. We have not had this amount of development in years so we truly don't know the 2067 02:51:30,680 --> 02:51:36,620 impact that this amount of growth will have on this community, our town, our services, and our 2068 02:51:36,620 --> 02:51:42,060 infrastructure. We are in uncharted times and now it's not the time for major growth, 2069 02:51:42,400 --> 02:51:44,900 let's take care of this town and the people who love it. 2070 02:51:50,000 --> 02:51:51,720 Planning and zoning checks off the basic 2071 02:51:51,720 --> 02:51:57,660 requirements for a development, but there are other boxes just as important. Our growth plan states 2072 02:51:57,660 --> 02:52:00,740 that the growth must look like it belongs in thermont. 2073 02:52:01,520 --> 02:52:03,400 It's supposed to support and advance 2074 02:52:03,400 --> 02:52:04,800 the character of the town. 2075 02:52:05,860 --> 02:52:07,500 And it's supposed to fit competitively 2076 02:52:07,500 --> 02:52:08,380 with its surroundings. 2077 02:52:09,100 --> 02:52:12,440 And provides a lasting benefit to the community, 2078 02:52:12,800 --> 02:52:15,720 including conservation of scenic views. 2079 02:52:16,740 --> 02:52:20,020 The growth plan also says that build out 2080 02:52:20,020 --> 02:52:22,920 of the growth area like the Simmer's annexation 2081 02:52:22,920 --> 02:52:25,720 would only occur in the distant future 2082 02:52:25,720 --> 02:52:29,640 beyond this master plan surrising of 2040. 2083 02:52:31,280 --> 02:52:32,720 We have a hundred homes. 2084 02:52:32,960 --> 02:52:37,480 A hundred homes is still an R5 dance community development. 2085 02:52:38,420 --> 02:52:42,300 This development would be three times the size of Hammaker Hills 1. 2086 02:52:43,760 --> 02:52:48,460 The majority of the Simmer's property is surrounded on two sides by rural land, 2087 02:52:48,860 --> 02:52:53,960 country roads, forest, Carol Street Park, and the historic apples church. 2088 02:52:53,960 --> 02:52:57,000 and another side has the modest one-story homes. 2089 02:52:58,060 --> 02:53:00,340 This large development of townhouses 2090 02:53:00,340 --> 02:53:03,260 is not compatible with the majority of this rounding area. 2091 02:53:04,040 --> 02:53:06,040 The residents of this town have already shown 2092 02:53:06,040 --> 02:53:08,960 that they care about what happens to this property. 2093 02:53:09,720 --> 02:53:11,320 This is not the time for growth 2094 02:53:11,720 --> 02:53:14,240 and I'm against the annexation and this development. 2095 02:53:14,660 --> 02:53:14,960 Thank you. 2096 02:53:16,280 --> 02:53:16,720 Thank you. 2097 02:53:19,710 --> 02:53:21,410 Is there anybody else that hasn't spoken 2098 02:53:21,410 --> 02:53:22,310 that would like to speak? 2099 02:53:26,450 --> 02:53:29,010 Ma'am, please state your name if you're a resident 2100 02:53:29,010 --> 02:53:30,190 and if you've been sworn in. 2101 02:53:42,950 --> 02:53:45,730 I'm Judy Miller, resident of Thurmond, 2102 02:53:46,110 --> 02:53:47,190 and I have been sworn in. 2103 02:53:47,650 --> 02:53:49,690 And I gave you all a whole speech last time, 2104 02:53:49,690 --> 02:53:50,590 so I won't go into it. 2105 02:53:52,170 --> 02:53:55,070 But I do not feel that the town of Thurmond 2106 02:53:55,070 --> 02:53:57,410 or you guys as planning and zoning 2107 02:53:57,410 --> 02:54:00,790 should be able to make a decision until after this court case. 2108 02:54:01,390 --> 02:54:04,270 This court case is holding us hostages. 2109 02:54:05,150 --> 02:54:09,010 He wants to talk about family communities, buildings. 2110 02:54:09,010 --> 02:54:16,730 He's holding families' hostages that they cannot take care of their elderly family members because we cannot sell our houses. 2111 02:54:17,690 --> 02:54:24,850 So until he decides that he's going to drop the case or the case goes before the courts, you all cannot make a decision. 2112 02:54:26,550 --> 02:54:31,510 And if that is January 13th of 2026, that's what it is. 2113 02:54:32,230 --> 02:54:32,970 Thank you. 2114 02:54:33,550 --> 02:54:34,330 Thank you. 2115 02:54:34,590 --> 02:54:35,010 Thank you. 2116 02:54:39,080 --> 02:54:44,900 Anybody else for public comment do you state your name if you're a resident if you're sworn in 2117 02:54:50,480 --> 02:54:53,980 James Miller. Yes, I've been sworn in. I am a resident 2118 02:54:55,020 --> 02:54:56,640 We owned a house over there for 2119 02:54:57,700 --> 02:55:02,280 15 years and the house is close enough for for us to be sued 2120 02:55:02,900 --> 02:55:06,680 But it's not close enough for us to get a letter saying about tonight 2121 02:55:08,340 --> 02:55:09,700 And that kind of crazy 2122 02:55:11,760 --> 02:55:18,060 So what I'm here, we are, my wife and I are 30 and 31, we're being sued separately, okay? 2123 02:55:18,180 --> 02:55:19,420 It's not like the conduits. 2124 02:55:19,680 --> 02:55:24,700 Yes, the conduits can sell because they're, he's suing the association, he's not 2125 02:55:24,700 --> 02:55:28,760 suing the individual person, he's suing my wife and I individually. 2126 02:55:29,420 --> 02:55:32,320 So we have to be representative two times. 2127 02:55:36,960 --> 02:55:39,240 The house was originally sold in September. 2128 02:55:39,240 --> 02:55:46,720 We talked to J. Day in April. The house had a five-month lease on it. It was supposed to be sold in September. 2129 02:55:47,700 --> 02:55:53,620 We were served in July. So we are stuck until this is straight down. 2130 02:55:54,540 --> 02:56:01,180 We can't solve the problem. I mean he's even saying that the pond is not moving. 2131 02:56:02,040 --> 02:56:04,900 And he don't say he's going to fix the pond with the development. 2132 02:56:04,900 --> 02:56:10,220 He said, possibility it could be worked into a solution, right? 2133 02:56:10,700 --> 02:56:12,120 So what he said, a solution. 2134 02:56:12,760 --> 02:56:14,120 He didn't say he's going to fix it. 2135 02:56:14,260 --> 02:56:14,900 I put him in. 2136 02:56:15,540 --> 02:56:16,420 And the ponds are not moving. 2137 02:56:16,800 --> 02:56:18,940 The ponds stay in and the same spot it is now. 2138 02:56:21,020 --> 02:56:21,800 I can't get it. 2139 02:56:21,860 --> 02:56:27,140 I can't prove this, but I was told, okay, that when the pond was put in, 2140 02:56:27,480 --> 02:56:31,480 there was a house built for Mrs. Simmons along that street. 2141 02:56:33,220 --> 02:56:34,180 That's why I was told. 2142 02:56:34,180 --> 02:56:37,160 If that's true or not, I don't know. 2143 02:56:38,000 --> 02:56:39,980 But that's what I was told years ago. 2144 02:56:43,190 --> 02:56:45,290 If you are going to prove something, 2145 02:56:46,670 --> 02:56:50,910 it needs to be there should not be a lawsuit tied into it. 2146 02:56:51,250 --> 02:56:52,070 That's all I'm saying. 2147 02:56:54,170 --> 02:56:57,230 We're being sued four times, our association, 2148 02:56:57,810 --> 02:57:01,330 the county, the state, and then my wife and I are individual. 2149 02:57:01,330 --> 02:57:08,290 So, you know, that's basically what I have to say. 2150 02:57:09,210 --> 02:57:09,490 Thank you. 2151 02:57:09,610 --> 02:57:09,850 Thank you. 2152 02:57:13,580 --> 02:57:15,140 Anybody else for public comment? 2153 02:57:20,610 --> 02:57:21,030 Last call. 2154 02:57:21,170 --> 02:57:22,550 Anybody for public comment? 2155 02:57:23,450 --> 02:57:24,650 On the summer's annexation. 2156 02:57:26,370 --> 02:57:28,210 Go ahead and close public comment. 2157 02:57:28,670 --> 02:57:29,230 Excuse me. 2158 02:57:29,850 --> 02:57:33,650 Do you want me to read the two that we received? 2159 02:57:34,790 --> 02:57:35,150 Yes. 2160 02:57:35,230 --> 02:57:35,430 Yes. 2161 02:57:36,150 --> 02:57:36,310 Okay. 2162 02:57:36,650 --> 02:57:37,630 They're not anonymous, right? 2163 02:57:37,630 --> 02:57:39,510 No, neither one is anonymous. 2164 02:57:42,220 --> 02:57:47,350 So we received earlier this week a letter to the Planning and Zoning Commission and I'm 2165 02:57:47,350 --> 02:57:48,010 going to read it. 2166 02:57:48,230 --> 02:57:58,050 It comes from 117 Easy Street, deer planning and zoning folks, RE cross and company application 2167 02:57:58,050 --> 02:58:00,530 for annexation of Simmer's property. 2168 02:58:01,170 --> 02:58:05,470 This is to express our opposition to the annexation of said property. 2169 02:58:05,470 --> 02:58:08,970 The reasons are many, but no need to state them here. 2170 02:58:09,370 --> 02:58:12,350 Respectfully submitted, Larry and Donna Ebby. 2171 02:58:19,980 --> 02:58:23,580 And then via email, receive the Planning and Zoning Commission, 2172 02:58:23,800 --> 02:58:26,440 receive this email. 2173 02:58:27,060 --> 02:58:28,740 Dear Planning and Zoning Commissioners, 2174 02:58:29,100 --> 02:58:32,560 the town has already voted down a proposed annexation 2175 02:58:32,560 --> 02:58:36,000 of the part of the Simmer's Farm that lies in Frederick County 2176 02:58:36,000 --> 02:58:39,900 and outside Thermal Town Limits by huge majority. 2177 02:58:39,900 --> 02:58:48,640 The bid of the Simmer's property in Thermont upgraded to R5 in 2022 master plan is itself 2178 02:58:48,640 --> 02:58:50,860 a travesty that should be reversed. 2179 02:58:51,760 --> 02:58:56,080 It was incorporated during COVID against the wishes of the residents it affects. 2180 02:58:57,260 --> 02:59:02,680 Under the present system, the master plan designations are Sankersinked. 2181 02:59:02,680 --> 02:59:12,580 They get included into revised plans after supposed public input, but the public that counts 2182 02:59:12,580 --> 02:59:14,640 never suggests these changes. 2183 02:59:15,240 --> 02:59:20,160 Apparently, the developers have the ear of the county planner assigned to Thermont or 2184 02:59:20,160 --> 02:59:25,900 someone else in the town with an agenda that is out of sync with the desires of the residents, 2185 02:59:26,180 --> 02:59:31,160 but is able to get the desired zoning designation inserted in the master plan. 2186 02:59:31,160 --> 02:59:37,660 The master plan needs real input from effective residents so that we can stop this endless loop 2187 02:59:37,660 --> 02:59:46,780 of developer proposals being rammed through despite almost universal resident opposition. 2188 02:59:47,440 --> 02:59:55,060 He references Mechanics Town LLC development on MSburg Road for a prior case of this nature. 2189 02:59:55,060 --> 02:59:59,900 We would hope that after the previous vote on the Simmers annexation 2190 03:00:00,000 --> 03:00:06,140 motion, the planning and zoning board would be 100% on the resident side. Thomas Cromwell. 2191 03:00:13,170 --> 03:00:17,290 And I wrote their written comments on the sign and she just as a point of reference. Okay. 2192 03:00:21,130 --> 03:00:26,590 Okay. So public comment is closed. So we were talking with the applicant. I would invite him back to the podium. 2193 03:00:29,650 --> 03:00:30,190 Let 2194 03:00:36,110 --> 03:00:40,210 me just say, 2195 03:00:44,270 --> 03:00:49,550 I need a Pepsi and we'll get onto that file soon, uh-huh. 2196 03:00:50,390 --> 03:00:53,350 Okay, so, okay, 2197 03:01:00,870 --> 03:01:05,350 what would it be, our intern around, so you don't have to walk behind. 2198 03:01:44,090 --> 03:02:01,170 I'm chairman. Thank you for the change in the order. I am my team. Find it valuable to hear this. Some of it. It's a little rough, but it's valuable for us to hear it. I think I'd like to try to explain a little bit history here for a moment. 2199 03:02:01,170 --> 03:02:06,810 So, with your permission, I'm going to work my way through this slide deck somewhat quickly. 2200 03:02:07,190 --> 03:02:08,870 It'll be in the public record. 2201 03:02:09,310 --> 03:02:12,170 We're also happy to go over it with anybody. 2202 03:02:13,310 --> 03:02:18,750 This brief was given, and I'm also going to try to respect the request we heard earlier, 2203 03:02:19,110 --> 03:02:20,950 and I'm going to brief off of that screen. 2204 03:02:22,230 --> 03:02:22,410 Okay. 2205 03:02:22,530 --> 03:02:27,570 This brief was given in August of 2023, next slide. 2206 03:02:27,570 --> 03:02:35,310 It was given to these people, so it's already on the public record with the Albert Court 2207 03:02:35,310 --> 03:02:40,650 Condominium Association, Gateway Enterprise arrived, Town of Thermite was present. 2208 03:02:41,850 --> 03:02:44,630 Lastly, I'm not here to litigate our issues this evening. 2209 03:02:44,710 --> 03:02:47,630 I'm just trying to provide the background material for everybody. 2210 03:02:48,670 --> 03:02:49,430 Next slide. 2211 03:02:50,650 --> 03:02:56,250 When we did the briefing, we asked the participants to identify their tax map parcels, so we knew 2212 03:02:56,250 --> 03:03:02,690 who we were speaking to. Next slide. These were our goals coming out of that meeting. 2213 03:03:03,390 --> 03:03:10,410 We had already issued the notice terminating the easements on Mrs. Simmer's property 2214 03:03:10,410 --> 03:03:14,710 and we were explaining that and we were doing what we're doing right now, which is the 2215 03:03:14,710 --> 03:03:20,890 history of the Albert's Court's development. We raised the question of the MS-4 permits. 2216 03:03:20,890 --> 03:03:23,930 we don't need to do that this evening. Next slide please. 2217 03:03:26,500 --> 03:03:27,260 John already covered 2218 03:03:27,260 --> 03:03:36,540 ESD to the MEP. The Albert Courts neighborhood is approximately 9.34 acres that 2219 03:03:37,320 --> 03:03:42,440 not all of it's impervious but none of it is treated and that's the argument. 2220 03:03:43,540 --> 03:03:52,040 Next slide. Okay, so that's a 1988 aerial image before anything happened. The 2221 03:03:52,040 --> 03:03:57,840 The NVR facility is still here, North Carol Streets Inn, look down Apple's Church Road, 2222 03:03:58,180 --> 03:04:01,680 some of the houses are there, Pleasant Acres is not built yet. 2223 03:04:02,400 --> 03:04:05,900 None of what you know today is Albert Courts was there. 2224 03:04:06,800 --> 03:04:07,400 Next slide. 2225 03:04:08,320 --> 03:04:13,580 That's the same, or, excuse me, roughly the same image today, so you can understand the 2226 03:04:13,580 --> 03:04:16,500 change that has happened between those two images. 2227 03:04:17,140 --> 03:04:20,340 This was a 2015 image date, so it's ten years old. 2228 03:04:20,340 --> 03:04:28,000 Next slide. This was done by John's firm a couple years ago with professional 2229 03:04:28,000 --> 03:04:33,360 surveyors to actually stake out the property line, stake out where everything 2230 03:04:33,360 --> 03:04:40,480 is on our side, and where the easement area is. Next slide. Here's the other 2231 03:04:40,480 --> 03:04:48,940 call out. So the temporary stormwater management facility, as built, is outside 2232 03:04:48,940 --> 03:04:56,240 side of the easement area. It's not all inside of where it's supposed to be. Next slide. 2233 03:04:57,440 --> 03:05:02,920 That's the topography. Notice the steepness of the hill. Those of you that live in Albert 2234 03:05:02,920 --> 03:05:09,020 Court Section 5, you know the steepness of the hill going down to Mrs. Simmer's property, 2235 03:05:09,540 --> 03:05:16,960 the same on the far side of Cody Drive. Next slide. An observation. Go back one slide for 2236 03:05:16,960 --> 03:05:25,800 me. I'll go back to slides for me. My discussion this evening and what is the point of 2237 03:05:25,800 --> 03:05:31,940 contention is the easement area that's on Mrs. Simmer's property. But there is a second 2238 03:05:31,940 --> 03:05:39,940 easement area on what is still owned by Gateway. Okay, so next slide. Let's catch up next. 2239 03:05:39,940 --> 03:05:47,460 anything that dumps from these Albert courts going condos, going towards 2240 03:05:47,460 --> 03:05:52,440 Cody, including that which comes off of the town property around your water 2241 03:05:52,440 --> 03:06:00,020 treatment plant gets to hear the slope then takes it to us. So any storm 2242 03:06:00,020 --> 03:06:08,820 water from this area still moves easterly to the other facility. Next slide, that's 2243 03:06:08,820 --> 03:06:10,680 another zoom in, next slide. 2244 03:06:12,040 --> 03:06:14,260 All right, this is out of date. 2245 03:06:14,460 --> 03:06:17,640 John, we've revised this since this brief was given in 2023. 2246 03:06:18,640 --> 03:06:20,840 This was what we thought at the time 2247 03:06:20,840 --> 03:06:26,280 was the drainage area on to Mrs. Simmers. 2248 03:06:26,660 --> 03:06:28,300 I've got another slide that covers it. 2249 03:06:28,580 --> 03:06:29,140 Next slide. 2250 03:06:30,700 --> 03:06:34,980 OK, we're going to go through some time sequence here. 2251 03:06:34,980 --> 03:06:43,680 1991. Notice this document is signed by soil conservation service. It had not the record 2252 03:06:43,680 --> 03:06:49,280 copy we got hadn't gotten signed by the other departments. Next slide. This is 2253 03:06:49,280 --> 03:06:57,340 Sprangler Court, the first townhouses that went up. The call out here is the storm drain lines. 2254 03:06:58,260 --> 03:07:04,320 It starts on the south side of Carroll. So it's actually picking up storm water presumably 2255 03:07:04,320 --> 03:07:10,380 out of the Ryan development or maybe just the drainage ditch along Carroll. 2256 03:07:11,000 --> 03:07:16,260 It's crossing, it's picking up the other side and in that era, it took it 2257 03:07:16,260 --> 03:07:21,520 northeredly and it just dumped it because nothing else was developed north 2258 03:07:21,520 --> 03:07:22,760 of Sprangler Court. 2259 03:07:24,670 --> 03:07:25,650 Excuse me. 2260 03:07:25,950 --> 03:07:26,690 Point of order. 2261 03:07:27,150 --> 03:07:29,530 There is no public comment from the floor at this time. 2262 03:07:30,410 --> 03:07:30,990 Thank you, ma'am. 2263 03:07:31,470 --> 03:07:31,890 Next slide. 2264 03:07:32,690 --> 03:07:38,530 Okay. And again, some of the documents seemed to indicate that a silk pond went at that 2265 03:07:38,530 --> 03:07:47,670 dump location in 91. Next slide. Again, commenting on how much comes from the town in pervious 2266 03:07:47,670 --> 03:07:57,630 surface of their public roads. Next slide. I'm sorry. I'll record section two. This is only in here. 2267 03:07:57,770 --> 03:08:04,650 Sorry. Sorry. Can we go back to the spangler? Sure. I missed that part. Can you go back? Let's back up. 2268 03:08:05,190 --> 03:08:13,790 Back up all the way back to the spang. Which one? You were talking about the the culvert and the pick up from 2269 03:08:13,790 --> 03:08:23,510 Okay, so that's shown in greater detail on the next two slides. This is the over view showing the whole thing. Let's go one slide forward for me. 2270 03:08:24,870 --> 03:08:38,190 Okay, the same thing. Here's that pickup from the south side of Carol crossing. It's also got to pick up from the other side of Luther. It's coming this way and it's draining northward. 2271 03:08:39,350 --> 03:08:51,320 Next slide. Same image again with those drains. 15-inch storm drain running 2272 03:08:51,320 --> 03:08:58,620 underneath Luther from the South Side of Cure. Next slide. Okay. This is in the 2273 03:08:58,620 --> 03:09:04,360 brief only to provide continuity of the sections. Section two, but this one's 2274 03:09:04,360 --> 03:09:09,280 all the way over by the back entrance to Ryan. It's not part of the drainage to 2275 03:09:09,280 --> 03:09:17,560 the summer's parcel. So it's not pertinent to this discussion. Next slide. Okay. 1992, and now it's 2276 03:09:17,560 --> 03:09:23,420 time for construction of the first two of what we know is the Albert courts condominium buildings, 2277 03:09:23,760 --> 03:09:32,680 the western two buildings. Call out for signatures, Frederick County Public Works in 93, the town in March 2278 03:09:32,680 --> 03:09:34,680 of 93. Next slide. 2279 03:09:37,910 --> 03:09:43,150 93. This is where they're going to go. That land still owns by Gateway. 2280 03:09:43,650 --> 03:09:44,190 Next slide. 2281 03:09:48,470 --> 03:09:55,630 Two 12 unit condominium buildings and it ties to the easement. You're dumping water 2282 03:09:55,630 --> 03:10:01,350 here at the end of Cody and you're dumping water onto the Simmers parcel. Next slide. 2283 03:10:06,220 --> 03:10:06,960 That's the 2284 03:10:06,960 --> 03:10:12,260 condition of those two drains when this image was taken probably back in 2285 03:10:12,260 --> 03:10:22,460 2018. Next slide. Okay. This is what I wanted to make sure people saw tonight. This 2286 03:10:22,460 --> 03:10:32,440 is not a recorded document but it was found in the records. This is a 1992 print 2287 03:10:32,440 --> 03:10:40,340 date, and the handwriting on it, I think I've got it zoomed in, is a 1996 note ad storm 2288 03:10:40,340 --> 03:10:48,320 water area all the way at the bottom, in handwriting, storm water here. Two things to call 2289 03:10:48,320 --> 03:10:54,480 out as you look at this. Albrecht Court Section 5, the three condo buildings, aren't on this 2290 03:10:54,480 --> 03:11:01,400 plan. Under the original thinking, Easy Street was going to turn, have a bunch of duplex units 2291 03:11:01,400 --> 03:11:08,040 and connect to Luther. When this was written in 92, next slide. 2292 03:11:10,430 --> 03:11:13,130 Okay, thing to point out, 2293 03:11:13,350 --> 03:11:18,490 if you go to the pre, go back one for me, Kelly, sorry, please note the civil engineer. 2294 03:11:19,010 --> 03:11:24,950 This is Harris, Amigo, associates, working for Mr. Clayball. Go to the next slide. 2295 03:11:24,950 --> 03:11:33,230 You got a changing engineer, now your Fox and Associates, before John Stein, who was 2296 03:11:33,230 --> 03:11:39,570 brought in to do section 4, and Mr. Clayball didn't do section 4, a different developer 2297 03:11:39,570 --> 03:11:39,910 did. 2298 03:11:40,570 --> 03:11:41,330 Next slide, 2299 03:11:43,380 --> 03:11:49,500 and they put in that developer, under guidance from Fox, put in their own 2300 03:11:49,500 --> 03:11:58,200 stormwater management pond that drains those townhouses does not drain Albert 2301 03:11:58,200 --> 03:12:04,760 Court's two condo buildings, approvals by all the county and state the county 2302 03:12:04,760 --> 03:12:12,200 and town governments. Next slide. Okay now we're on to Albert Court section 5, the 2303 03:12:12,200 --> 03:12:21,100 three condominium buildings that are to the east. And date time, these signatures are 2304 03:12:21,100 --> 03:12:27,980 in the summer of 96. Next slide. There are the three of them. The storm drain that 2305 03:12:27,980 --> 03:12:34,080 was previously coming out of Sprangler and just dumping is now connected. It goes on down 2306 03:12:34,080 --> 03:12:42,480 Luther and goes into something on Mrs. Simmer's parcel. I want to call out, you can't read 2307 03:12:42,480 --> 03:12:51,040 it at this scale, but see the note at the very top. Go to the next slide, please. This 2308 03:12:51,040 --> 03:12:57,020 shows, again, the stormwater coming into not only the Eastman area, but outside the Eastman 2309 03:12:57,020 --> 03:13:03,720 area, next slide. And let's go to the note. We're signed off by Frederick 2310 03:13:03,720 --> 03:13:13,620 County in July 96 were signed off for stormwater in July 96. The note says the temporary SWM facility 2311 03:13:13,620 --> 03:13:20,880 will be maintained by gateway enterprises until the site is stabilized and 90% of the units have 2312 03:13:20,880 --> 03:13:33,700 been sold. At that time the homeowners association will assume the maintenance responsibility of the 2313 03:13:33,700 --> 03:13:34,780 All 2314 03:13:40,350 --> 03:13:47,710 right. So, earlier we saw a 1992 possible concept plan for the development of a whole parcel. 2315 03:14:02,040 --> 03:14:11,100 This is a later concept plan. Notice the three condominium buildings in Section 5 are built. 2316 03:14:11,800 --> 03:14:19,120 Notice Luther Drive continues all the way down and connects at what at the time was still called 2317 03:14:19,120 --> 03:14:26,720 Grayson. Notice that Easy Street didn't connect, because they did a series of singles, 2318 03:14:27,340 --> 03:14:36,680 towns, singles on Apple's Church and a mixture in here. Again, not a recorded document never 2319 03:14:36,680 --> 03:14:43,120 actually agreed to, but showed the concept plan. This is the big call out. Temporary Storm 2320 03:14:43,120 --> 03:14:49,280 motor management for Section 5 here, permanent stormwater at the bottom of the hill. 2321 03:14:50,060 --> 03:14:57,540 Next slide, temporary, permanent at the bottom of the hill, the HOA has the responsibility 2322 03:14:57,540 --> 03:14:59,240 for the maintenance of the temporary. 2323 03:15:00,000 --> 03:15:29,820 Next slide. This one's also out of date. You can skip it. And you can skip that one. Okay, so folks, this is why we're in the mess we're in. The original developer didn't do storm order for their section. And it's on Mrs. Simmer's parcel, and we need to have it removed. Your anger is at me, very respectfully. Your anger needs to be at the sovereigns who sign the thing off. 2324 03:15:29,820 --> 03:15:36,400 many years ago. We will find a solution. Water has to flow downhill, but we've got to clear 2325 03:15:36,400 --> 03:15:41,920 the title and make it possible for Mrs. Simmers to sell her property, for you guys to have 2326 03:15:41,920 --> 03:15:47,440 permanent storm water, and for the partially developed in accordance with the growth plans 2327 03:15:47,440 --> 03:15:57,020 of the town that go back certainly the 2008 comp plan, not a mayor, Chairman, and probably, 2328 03:15:57,020 --> 03:15:58,760 Yeah, you got promoted. Sorry about that, John. 2329 03:16:01,280 --> 03:16:07,400 And I suspect, based off of all these documents, it's been in the growth area since the early 2330 03:16:07,400 --> 03:16:10,080 90s when the whole neighborhood was being planted. 2331 03:16:11,680 --> 03:16:16,620 I wouldn't ask a question about the farmland itself, because that was one of my questions 2332 03:16:16,620 --> 03:16:17,080 from earlier. 2333 03:16:18,540 --> 03:16:24,360 Was there something wrong with the soil, with the farmland that made it not usable or 2334 03:16:24,360 --> 03:16:28,720 There was just a discussion that just for strictly growth that this is where the town 2335 03:16:28,720 --> 03:16:33,500 decided that they wanted to go or was there like an actual issue with the farmland itself? 2336 03:16:35,260 --> 03:16:41,100 Does that mean that's important to not aware of any issues with the farmland, with crops? 2337 03:16:41,940 --> 03:16:42,600 There's no way. 2338 03:16:42,600 --> 03:16:48,020 The commentary I would make is this parcel of those still zoned agricultural in the county 2339 03:16:48,020 --> 03:16:53,840 is not in the county planning documents as an agricultural area that needs to be kept. 2340 03:16:54,720 --> 03:16:58,620 If you look at the Thurma, if you look at the county chart, it's not there. 2341 03:16:59,280 --> 03:17:05,100 Mrs. Simmers is not able to make money farming that ground, so it's gone to follow. 2342 03:17:05,460 --> 03:17:06,800 But you could sell it to a farmer. 2343 03:17:10,760 --> 03:17:19,500 Yeah, sometimes there's like, I'm sure you're following the NPR discussion with putting things that don't have any other use on the land. 2344 03:17:19,500 --> 03:17:22,580 because it's not feasible to use it for the designated use. 2345 03:17:23,240 --> 03:17:25,420 That's a historical question to figure out. 2346 03:17:26,100 --> 03:17:28,840 Was the soil bad or that was just, it was a growth, 2347 03:17:29,180 --> 03:17:30,500 we were planning on moving here. 2348 03:17:31,120 --> 03:17:34,480 I got to come back to you, the municipality, 2349 03:17:35,100 --> 03:17:37,960 have designated it as being in your growth area, 2350 03:17:38,500 --> 03:17:40,980 since at least your 2008 comp plan, 2351 03:17:41,240 --> 03:17:43,660 and I strongly suspect since your mid 90s. 2352 03:17:44,420 --> 03:17:47,120 So I'm simply following the written guidance 2353 03:17:47,120 --> 03:17:51,940 that you've been telling the county and the Maryland Office of Planning for 2354 03:17:51,940 --> 03:17:55,640 25 years or more. This is what you want to done with the ground. 2355 03:17:55,960 --> 03:17:56,200 Can 2356 03:18:04,270 --> 03:18:09,930 we talk about the assisted living facility and what that might look like? 2357 03:18:10,330 --> 03:18:17,970 Are you are you planning on leasing that or are you going to sell that out right when 2358 03:18:17,970 --> 03:18:24,050 this gets done? So when we saw each other at the Maryland Office of Planning 2359 03:18:24,050 --> 03:18:31,750 planning, slash Maryland planners association meeting at Ellicott City. I then shared with 2360 03:18:31,750 --> 03:18:38,010 all of you via Kelly, a copy of the Health Dimensions group at a Minneapolis, Minnesota's 2361 03:18:38,010 --> 03:18:45,570 senior living study for the overall thermon area. I'm also reacting to the Thermon Economic 2362 03:18:45,570 --> 03:18:50,970 Development Director's survey, now getting some long teeth on it, that said there was 2363 03:18:50,970 --> 03:19:00,190 a demand for assisted living in thermo. I'm a real estate developer. I'm a broker. I'm not an 2364 03:19:00,190 --> 03:19:06,730 operator of senior living facility. We will go to companies like HDG or other competitive 2365 03:19:07,730 --> 03:19:13,230 regionally based operators who do this for their living and they will either lease the facility 2366 03:19:13,230 --> 03:19:19,070 from us or ground lease it from us once it's built. But no, crossing companies not can operate it. That's 2367 03:19:19,070 --> 03:19:19,810 It's not what I deal. 2368 03:19:21,710 --> 03:19:23,830 I was just making sure the plan hasn't changed on that one, 2369 03:19:23,930 --> 03:19:25,830 because I know that was a big question. 2370 03:19:25,950 --> 03:19:26,710 I'm sorry, couldn't hear you. 2371 03:19:27,250 --> 03:19:28,750 I was making sure that I was still the plan. 2372 03:19:29,610 --> 03:19:29,770 Yeah. 2373 03:19:30,890 --> 03:19:32,910 We're working on the architectural side. 2374 03:19:33,070 --> 03:19:35,810 We work with Nolkren Hall Architects out of Chambersburg. 2375 03:19:35,970 --> 03:19:37,870 They are specialists in senior living. 2376 03:19:38,490 --> 03:19:40,010 And to your question earlier on the fire, 2377 03:19:40,250 --> 03:19:42,650 remember, all of these buildings are every resonance 2378 03:19:42,650 --> 03:19:45,250 in Maryland today has to be sprinklered, 2379 03:19:45,430 --> 03:19:47,410 but a senior living facility gets sprinklered 2380 03:19:47,410 --> 03:19:48,530 to an incredible extent. 2381 03:19:50,170 --> 03:19:54,870 But no, what I will seek to do is identify an operator. 2382 03:19:55,050 --> 03:19:57,370 We will work with that operator on building design. 2383 03:19:57,650 --> 03:19:59,710 We've already done sun comp set designs, 2384 03:20:00,790 --> 03:20:03,670 and we would ultimately engage in a lease with them. 2385 03:20:09,390 --> 03:20:10,590 Questions for the applicant? 2386 03:20:13,190 --> 03:20:14,010 Have you got anything else? 2387 03:20:14,670 --> 03:20:14,870 No. 2388 03:20:15,290 --> 03:20:16,110 Actually, I have to move. 2389 03:20:17,070 --> 03:20:18,910 Does anybody have a follow-up question to staff? 2390 03:20:21,840 --> 03:20:24,080 Point of clarity, I've wrote down about the well. 2391 03:20:25,200 --> 03:20:29,060 that's going to be utilized for the subdivision, 2392 03:20:29,260 --> 03:20:32,580 is that currently offline due to PFAS? 2393 03:20:32,960 --> 03:20:37,020 Yes, we do have one of our wells that are offline due to PFAS. 2394 03:20:37,520 --> 03:20:41,020 And for this, would that be applicable to this development? 2395 03:20:42,080 --> 03:20:44,960 I'd have to defer to the Water Department. 2396 03:20:46,400 --> 03:20:47,180 Sure, that's not. 2397 03:20:47,940 --> 03:20:49,700 Well, you've offline, well, seven of you have to be sure. 2398 03:20:49,840 --> 03:20:51,640 Okay, well, Jim is saying no. 2399 03:20:51,640 --> 03:20:55,700 So, well eight is offline and well seven would be servicing this development. 2400 03:20:58,300 --> 03:20:58,820 All 2401 03:21:08,060 --> 03:21:08,580 right. 2402 03:21:08,720 --> 03:21:09,060 Thank you. 2403 03:21:09,460 --> 03:21:10,560 Thank you, Madam Chairman. 2404 03:21:11,000 --> 03:21:11,360 Madam Mayor. 2405 03:21:13,020 --> 03:21:13,540 I 2406 03:21:20,200 --> 03:21:21,420 might have a question for legal. 2407 03:21:24,180 --> 03:21:30,700 Just relaying a public comment to legal, is it possible for us to proceed with this annexation 2408 03:21:30,700 --> 03:21:33,060 application while pending lawsuit is happening? 2409 03:21:33,840 --> 03:21:35,460 That was a question that was proposed by the public. 2410 03:21:35,460 --> 03:21:42,880 the answer to that question is yes it is and I think it's important to clarify 2411 03:21:42,880 --> 03:21:50,580 that what you're tasked with doing is addressing the points in the code 2412 03:21:50,580 --> 03:21:59,540 that is what your job is it's not anything else and that 2413 03:22:01,650 --> 03:22:02,870 that is the focus 2414 03:22:02,870 --> 03:22:05,730 of what this commission does. 2415 03:22:07,910 --> 03:22:09,570 Yeah, my follow-up to that was, 2416 03:22:10,150 --> 03:22:14,890 do we have any legal path to deny anything 2417 03:22:14,890 --> 03:22:17,210 in this commission if they meet the criteria? 2418 03:22:18,270 --> 03:22:21,290 OK, so what your job here is with respect 2419 03:22:21,290 --> 03:22:23,730 to the annexation plan is not an approval. 2420 03:22:24,790 --> 03:22:28,590 What this is is a review of the plan that's been submitted 2421 03:22:28,590 --> 03:22:29,410 to you. 2422 03:22:30,050 --> 03:22:32,150 That is all that this is. 2423 03:22:32,150 --> 03:22:40,010 that review gets submitted to the Board of Commissioners and it is the Board of 2424 03:22:40,010 --> 03:22:48,310 Commissioners homework that reviews and passes on the proposed annexation. 2425 03:22:48,910 --> 03:22:54,870 The purpose of this exercise is to determine if it needs the criteria set 2426 03:22:54,870 --> 03:23:03,690 fourth in your code. It's not a for vote, it's not a naivot. It is just simply your observations 2427 03:23:03,690 --> 03:23:06,390 that are being presented to the Board of Commissioners. 2428 03:23:06,790 --> 03:23:07,790 Thank you for that clarification. 2429 03:23:08,310 --> 03:23:08,470 Sure. 2430 03:23:11,700 --> 03:23:21,560 And for the traffic study and recommendations for a pre-annexation agreement, that is just 2431 03:23:21,560 --> 03:23:37,560 included in the resolution itself. That's nothing. That's which resolution are you talking about the resolution that we would be making if it if it does me the criteria or if it doesn't because it says you know whether the annexation should be approved or denied and what if any conditions. 2432 03:23:38,320 --> 03:23:47,860 The planning commission believes the mayor and commissioners to place all the approval on the annexation to ensure that it conforms the recommendations of the comprehensive plan. 2433 03:23:47,860 --> 03:23:55,580 Okay, so we have to be careful about terminology, and I know that people get irritated with 2434 03:23:55,580 --> 03:23:59,400 lawyers for being sort of dancing on the head of a pen, and I get that. 2435 03:23:59,900 --> 03:24:02,280 But you're not passing a resolution. 2436 03:24:03,040 --> 03:24:04,660 That is not what you're doing. 2437 03:24:05,120 --> 03:24:11,400 What you're doing is a review of the application to determine whether or not, in your opinion, 2438 03:24:11,960 --> 03:24:14,360 it meets the criteria set forth in the code. 2439 03:24:14,360 --> 03:24:20,860 It is only the Board of Commissioners that can make the resolution, and as part of that 2440 03:24:20,860 --> 03:24:27,520 program, it's not just the annexation plan that's being submitted, but another important 2441 03:24:27,520 --> 03:24:30,640 component is an annexation agreement. 2442 03:24:31,060 --> 03:24:38,580 And in the annexation agreement, that is where certain concessions are offered, if you will, 2443 03:24:38,720 --> 03:24:41,820 by a proponent, someone who's seeking an annexation. 2444 03:24:41,820 --> 03:24:57,760 So, for example, if you say, well, you know, if this is going to proceed, it would be a really good idea for you to, you know, look at the parks over here and improvements to adjacent parks or something like that. 2445 03:24:57,900 --> 03:25:04,020 That's certainly something that can be within the scope of your recommendation and that would become part of an agreement. 2446 03:25:04,020 --> 03:25:06,220 month. Okay. 2447 03:25:09,060 --> 03:25:15,560 If it were adopted by the board commissioners. Right. Just to be abundantly clear. 2448 03:25:15,920 --> 03:25:21,040 I think that's very important to note that we we are an apolitical body. We are volunteers. 2449 03:25:21,060 --> 03:25:27,500 We are we are actually not paid. We have a stipend of $25 for full transparency per meeting 2450 03:25:27,500 --> 03:25:41,940 that we attend, not about $450,000, so we don't, as Leslie was saying, we are completely 2451 03:25:41,940 --> 03:25:48,060 separate from whatever we have. There's three components of the requirements in the 2452 03:25:48,060 --> 03:25:55,240 zoning code. That's it. It's nothing more than that. I do, Kelly, you wrote it in your 2453 03:25:55,240 --> 03:26:01,200 sacriport about the discrepancy, the wording of the master plan with the R5 density. 2454 03:26:02,340 --> 03:26:07,020 So that's an issue for me, because it's not crystal clear. 2455 03:26:08,080 --> 03:26:17,500 And for the sake of clarity for us, how do we, we can do up to the 10 per acre, right? 2456 03:26:17,680 --> 03:26:22,920 That's what the actual R5 is, but the way that it's written kind of contradicts that in 2457 03:26:22,920 --> 03:26:23,640 the master plan. 2458 03:26:23,640 --> 03:26:31,440 So it's creating some confusion and I don't know legally how the best way to make sure that we are 2459 03:26:32,160 --> 03:26:40,300 I don't know we were protected, but doing our due diligence when we're we're reading something and and it doesn't say the same as what this says over here 2460 03:26:41,320 --> 03:26:44,060 Well, I'll make a comment to that. I know with reading the 2461 03:26:44,880 --> 03:26:52,600 Master Plan it's it's in there as suggestions and guidance and that the R5 is the suggested 2462 03:26:53,640 --> 03:26:58,600 density for the annexation. So not necessarily the controlling density. 2463 03:26:59,420 --> 03:27:04,380 Right, and that's something we touched on of what that, if the annexation does occur, 2464 03:27:04,660 --> 03:27:08,360 what the density would be for that parcel of land. 2465 03:27:08,800 --> 03:27:14,900 The way your code has been read is up to. That's the way the code has been read. 2466 03:27:22,030 --> 03:27:26,710 All right. I don't think we're going to be making any decisions tonight. 2467 03:27:26,710 --> 03:27:36,410 I mean, I think we were just trying to interface and understand the project more, but I mean I did a full transparency. 2468 03:27:36,650 --> 03:27:47,810 I did send an email to staff today because some of the feedback that I did here was that some people told me that they could not speak because of the pending litigation. 2469 03:27:47,810 --> 03:27:57,230 They were they were counseled to not come and speak. So I feel like that's counterproductive to the discussion for not hearing from people that can't come here and speak. 2470 03:27:57,990 --> 03:28:09,430 So there is some merit to some of the comments made it's, you know, I know at the end of the day if it meets these three criteria, then, then so be it. 2471 03:28:09,430 --> 03:28:20,150 But for one of our goals is supposed to be community outreach and transparency and we don't have that if we can't have the full participation from people that can't be here. 2472 03:28:20,570 --> 03:28:23,190 So I just wanted to point that out. 2473 03:28:24,050 --> 03:28:33,310 Yeah, I don't know to what extent anybody has received such legal advice is obviously not our purview to invade attorney client privilege. 2474 03:28:33,310 --> 03:28:42,690 And I think that if somebody, I mean, if somebody stood up and said, I can't talk about 2475 03:28:42,690 --> 03:28:50,270 this because it's imprudent to do so, then you have somebody saying that to you directly. 2476 03:28:52,010 --> 03:28:53,150 But that didn't happen. 2477 03:28:54,590 --> 03:28:58,270 So you know, it's, I understand what you're saying. 2478 03:28:58,270 --> 03:29:04,230 It makes perfect sense that you want to have a full and fair discussion of the issues involved 2479 03:29:05,150 --> 03:29:11,350 and I know that this is caused an incredible amount of turmoil and disruption and hardship 2480 03:29:11,350 --> 03:29:15,070 to the citizens of, you know, and the residents of this area. 2481 03:29:15,450 --> 03:29:17,930 And so I get it. 2482 03:29:19,110 --> 03:29:25,670 But again, this is in your discretion as to how it affects your formulation. 2483 03:29:26,170 --> 03:29:28,670 I mean, it's not like there's a writer or a wrong answer. 2484 03:29:33,270 --> 03:29:36,290 I had another question, but I honestly have no idea what it was. 2485 03:29:44,420 --> 03:29:50,940 So do we want to defer to, because we have a new plan that we're going to be discussing 2486 03:29:50,940 --> 03:29:54,560 next month on the same part of the property. 2487 03:29:55,640 --> 03:29:56,060 Correct. 2488 03:29:56,060 --> 03:29:59,960 If you're for your April agenda, we have received a 2489 03:30:12,140 --> 03:30:29,520 And then we have the annual report. Correct. And then you also have some other items that the board of commissioners have given you for some discussion and making a recommendation, which would be discussion on street withs, and of course, your. 2490 03:30:29,520 --> 03:30:34,720 for accessory dwelling unit discussion as well. 2491 03:30:40,430 --> 03:30:41,050 Yeah, so. 2492 03:30:42,390 --> 03:30:44,310 Yeah, how long are we going to keep delaying this? 2493 03:30:44,530 --> 03:30:45,270 That's what we have. 2494 03:30:46,490 --> 03:30:50,610 I mean, we have two options, approve or not approve, 2495 03:30:50,970 --> 03:30:52,790 based upon these three criteria. 2496 03:30:53,530 --> 03:30:56,130 So is that something that you guys want to talk about that tonight? 2497 03:30:57,070 --> 03:30:59,510 Or do you want, I mean, what, this is our commission. 2498 03:31:00,770 --> 03:31:02,150 We're, we're in this together. 2499 03:31:06,000 --> 03:31:16,300 No. No. Not about this particular item. We will have public comment at the end. And we are required to have that rate. 2500 03:31:18,900 --> 03:31:23,090 I don't even know. I'm so tired. I'm sorry. 2501 03:31:23,470 --> 03:31:27,470 That's why I think it's 9.30. I don't think you're going to get a lot of intelligent discussion. 2502 03:31:27,730 --> 03:31:29,450 Yeah. Amongst us tonight. 2503 03:31:29,630 --> 03:31:32,810 Right. So we're putting this on the docket then for May. 2504 03:31:32,810 --> 03:31:42,350 I mean April so we have like five things on there I think it will be very confusing to 2505 03:31:42,350 --> 03:31:44,210 combine this with the concept. 2506 03:31:44,630 --> 03:31:49,490 I think you would be better off doing this in May. 2507 03:31:52,470 --> 03:32:02,200 Okay so before just before we go back into public comment for April we're going to start 2508 03:32:02,200 --> 03:32:02,700 at 7. 2509 03:32:07,430 --> 03:32:14,790 We're going to we're going to talk about the annual report, the concept plan for 2510 03:32:14,790 --> 03:32:17,970 the Simmer's property that's located in town for 38 townhomes, 2511 03:32:20,760 --> 03:32:21,980 80 use. 2512 03:32:26,070 --> 03:32:27,390 And then point 2513 03:32:27,390 --> 03:32:33,030 of clarity, have we gotten the survey results from that survey that Vicki did? Because I 2514 03:32:33,030 --> 03:32:36,170 think part of it was like based upon the revitalization of the economic. 2515 03:32:36,170 --> 03:32:56,010 I just received in the day, so I will disseminate that way we can kind of circle back because we may want to break down our revitalization topics because it's like that's a whole thing in itself of like a whole other review on what that's going to look like. 2516 03:32:56,430 --> 03:33:03,230 So I think maybe addressing what we need to fix now would probably be prudent versus doing all of that. 2517 03:33:03,230 --> 03:33:04,610 So, 2518 03:33:08,370 --> 03:33:12,810 and what else you said the street, yeah, the street was correct. 2519 03:33:22,130 --> 03:33:36,120 So, annual report, concept plan of in town, summer property, ADUs, revitalization survey recap. 2520 03:33:37,260 --> 03:33:41,740 Yeah, I'd like to, when you discuss, I'd like to have the upcoming development major 2521 03:33:41,740 --> 03:33:46,060 here as well for tanger questions, so I'll see if she'll bail more or not. 2522 03:33:46,360 --> 03:33:49,000 Okay, and then street woods, 2523 03:33:51,200 --> 03:33:52,960 does that cover everything that you have? 2524 03:33:53,080 --> 03:33:54,500 Do we have anything else that's coming down? 2525 03:33:55,320 --> 03:34:02,520 No, I haven't gotten anything, and the deadline for making the April meeting was this past 2526 03:34:02,520 --> 03:34:05,500 Friday, so we can't accept anything else. 2527 03:34:05,500 --> 03:34:12,500 Okay, so the nay it'll be the annexation of 2528 03:34:14,810 --> 03:34:18,050 the 18-point whatever acres, right? 2529 03:34:19,390 --> 03:34:20,310 Simmer's property. 2530 03:34:20,650 --> 03:34:27,820 Well, I mean, I don't know if you want to have anything in May because logically we would 2531 03:34:27,820 --> 03:34:31,660 want to do or have the applicant do a traffic impact study. 2532 03:34:32,340 --> 03:34:38,060 So is there a direction from the planning commission at this point that we would like 2533 03:34:38,060 --> 03:34:46,440 to add into the existing traffic impact study to, because you're going to need that information 2534 03:34:46,440 --> 03:34:53,560 to help formulate your response and make your findings, make your recommendation to the 2535 03:34:53,560 --> 03:34:54,360 mayor and commissioners. 2536 03:34:55,140 --> 03:35:01,300 So that is important information for you to have to facilitate in your deliberation and 2537 03:35:01,880 --> 03:35:03,520 make formulating your recommendation. 2538 03:35:04,040 --> 03:35:04,160 All right. 2539 03:35:04,160 --> 03:35:11,580 And I can we also add about the existing parking situation with the two streets that they're they're trying to also widen and go through because 2540 03:35:12,220 --> 03:35:17,600 That's that's a big concern for me. I know it's not part of it, but it's impacting a 2541 03:35:18,280 --> 03:35:20,880 traffic study is not going to look at parking 2542 03:35:21,720 --> 03:35:30,840 They but it will look at traffic. So you know take into consideration the existing conditions and formulate the added 2543 03:35:33,180 --> 03:35:38,500 anticipated growth as well as what the development will produce, but they won't, doesn't look 2544 03:35:38,500 --> 03:35:43,040 at, you know, the parking conditions. But that is definitely something that you can state 2545 03:35:43,040 --> 03:35:49,900 in your recommendation to the mayor and commissioners that that's something that is a concern to 2546 03:35:49,900 --> 03:35:50,080 you. 2547 03:35:52,840 --> 03:35:58,420 Okay. And then what about the stormwater management? Can we also address that preliminary with 2548 03:35:58,420 --> 03:36:08,280 traffic study to figure out if this will alleviate all of the issues. I know it's hard 2549 03:36:08,280 --> 03:36:13,000 to say because there's litigation happening, but whatever is being proposed is that actually 2550 03:36:13,000 --> 03:36:19,100 going to be ratified and amicable to the county because they're the ones that approve 2551 03:36:19,100 --> 03:36:19,460 it. 2552 03:36:21,280 --> 03:36:29,080 So, so you're you're asking if if that like the storm water can be something that you can look at now. 2553 03:36:30,080 --> 03:36:33,600 Yeah, in conjunction with the development is that what you're saying? 2554 03:36:33,760 --> 03:36:38,020 Yeah, and and informulating your your recommendation to the mayor commissioners. 2555 03:36:38,280 --> 03:36:43,740 I mean, yeah, you can absolutely put any of that information into your recommendation. 2556 03:36:43,740 --> 03:36:50,020 Yeah, just keeping in mind that the ultimate stormwater facility approval rests with the county 2557 03:36:50,960 --> 03:36:57,380 Not with them on right. That's what I'm saying and not for us, but for them the the bodies that be 2558 03:36:58,060 --> 03:36:59,120 bless or not 2559 03:36:59,860 --> 03:37:06,500 The the point was also made that this traffic study should be done while school is still in session 2560 03:37:06,500 --> 03:37:08,360 Yeah, okay 2561 03:37:08,360 --> 03:37:09,020 That makes sense. 2562 03:37:09,020 --> 03:37:11,580 That just keeps that in mind in terms of how you're going. 2563 03:37:14,240 --> 03:37:19,420 And then the peak times will be adjusted to reflect NVR's traffic. 2564 03:37:19,600 --> 03:37:19,700 Right. 2565 03:37:20,300 --> 03:37:20,460 Yeah. 2566 03:37:20,640 --> 03:37:28,660 I mean, when the traffic study was originally done, it was not or did not take into consideration 2567 03:37:28,660 --> 03:37:30,540 NVR shift changes. 2568 03:37:31,240 --> 03:37:35,920 The amendment to that traffic impact study did take that into account. 2569 03:37:35,920 --> 03:37:39,660 So they read it their counts and took that into consideration. 2570 03:37:40,340 --> 03:37:43,780 So again, we can rely on those time frames 2571 03:37:43,780 --> 03:37:47,240 that were previously used in the amendment 2572 03:37:47,640 --> 03:37:50,580 to the traffic impact study and apply those 2573 03:37:50,900 --> 03:37:53,880 to have them update that. 2574 03:37:54,140 --> 03:37:59,520 So it would include peak hours, which is our standard morning 2575 03:37:59,520 --> 03:38:01,500 peak hour and your evening peak hour, 2576 03:38:01,500 --> 03:38:04,280 as well as the NBR shift changes. 2577 03:38:04,280 --> 03:38:04,420 Yes. 2578 03:38:04,940 --> 03:38:05,240 Okay. 2579 03:38:11,890 --> 03:38:17,330 Anything else last time that the previous commission asked for that helped them make their 2580 03:38:17,330 --> 03:38:17,710 decision? 2581 03:38:20,530 --> 03:38:20,850 No. 2582 03:38:21,170 --> 03:38:23,430 I mean, I don't have anything else to add. 2583 03:38:23,650 --> 03:38:27,530 I've provided with all the information minus the traffic impact study. 2584 03:38:29,130 --> 03:38:30,150 Is that sound fair? 2585 03:38:30,610 --> 03:38:30,690 Good. 2586 03:38:31,130 --> 03:38:32,190 All right. 2587 03:38:36,740 --> 03:38:40,820 I guess one question you may want to post to the applicant is a timing on the traffic impact 2588 03:38:40,820 --> 03:38:41,300 study. 2589 03:38:41,400 --> 03:38:43,000 If it can be done before the May meeting. 2590 03:38:43,000 --> 03:38:46,380 I don't know, I don't know the answer to that. 2591 03:38:48,300 --> 03:38:49,620 They said they don't know the answer. 2592 03:38:52,240 --> 03:38:55,780 Because the guidance we have had is that we're supposed to be hands off. 2593 03:38:56,140 --> 03:39:00,200 So my expectation is that I was talking to Kelly and Jim and we're coming a couple of 2594 03:39:00,200 --> 03:39:05,420 days and arranging for me to be hands off and for them to go. 2595 03:39:06,660 --> 03:39:10,000 But I didn't obviously want to proceed with that until we had tonight's meeting. 2596 03:39:10,400 --> 03:39:10,500 Yeah. 2597 03:39:10,500 --> 03:39:16,040 I mean, absolutely, Jim and I can work with their traffic engineer to formulate the 2598 03:39:16,040 --> 03:39:17,740 intersections to look at and to study. 2599 03:39:18,120 --> 03:39:25,780 My question to you is, is beyond these standard ones that have been looked at previously, 2600 03:39:26,560 --> 03:39:32,300 is there any other intersections that you would like to add to that update? 2601 03:39:35,320 --> 03:39:40,720 I think one of the citizens raised good point of coming off of Grace Ham. 2602 03:39:40,720 --> 03:39:48,260 Yeah, great salmon. I was church. Definitely needs to be and I guess the traffic study does it include the proposed 2603 03:39:48,880 --> 03:39:52,500 Intersections like the new ones that technically don't exist yet like so 2604 03:39:55,340 --> 03:39:56,380 since that does them 2605 03:39:57,160 --> 03:40:01,880 Obviously no one's turning left or right in which rate that doesn't exist. Correct. Yes. Yeah 2606 03:40:02,600 --> 03:40:04,760 There's a thought there 2607 03:40:15,120 --> 03:40:16,340 Stop are you guys good? 2608 03:40:17,020 --> 03:40:21,000 All right, I think so. Yep. We're ready to work with the with the applicant too 2609 03:40:21,240 --> 03:40:23,460 make sure that traffic impacts study gets squared away. 2610 03:40:23,820 --> 03:40:26,860 And then if it can't happen before our main meeting, 2611 03:40:27,600 --> 03:40:28,620 I'll update you in April. 2612 03:40:29,420 --> 03:40:29,520 OK. 2613 03:40:31,240 --> 03:40:33,240 A liaison, a temporary liaison. 2614 03:40:33,520 --> 03:40:33,840 Yes, sir. 2615 03:40:33,900 --> 03:40:34,260 A liaison. 2616 03:40:34,580 --> 03:40:36,400 I got one thought here. 2617 03:40:37,140 --> 03:40:40,460 And I don't know how it would be possible to do, 2618 03:40:40,520 --> 03:40:44,000 but with the developments that are proposed 2619 03:40:44,000 --> 03:40:47,800 to go in on Emmett's word road with access on the hour road, 2620 03:40:47,800 --> 03:40:55,120 Is there any way you can get a ballpark figure on traffic while you're doing this traffic 2621 03:40:55,120 --> 03:41:00,440 study to add to that because that's going to affect this whole deal in time? 2622 03:41:00,920 --> 03:41:01,760 Yes, absolutely. 2623 03:41:02,040 --> 03:41:04,660 All of those developments are taken into consideration. 2624 03:41:05,160 --> 03:41:10,680 So when the original traffic impact studies were done, it took into consideration Highmaker 2625 03:41:10,680 --> 03:41:17,520 Hills, Mountain Brook, Mechanics Town, the addition will be the leal, the six leal. 2626 03:41:18,080 --> 03:41:23,240 single family homes, but all the other developments that were in the pipeline at 2627 03:41:23,240 --> 03:41:29,500 that time are still in the pipeline now with the addition of that one family, our 2628 03:41:29,500 --> 03:41:34,000 six single family homes subdivision. So that'll all have to be included. 2629 03:41:34,500 --> 03:41:34,500 Yep. 2630 03:41:41,650 --> 03:41:43,410 All right, last call up here before I go into public comment. 2631 03:41:44,650 --> 03:41:49,210 If you have a public comment, please come to the podium, state your name and whether or 2632 03:41:49,210 --> 03:41:49,910 not you're a resident. 2633 03:42:07,270 --> 03:42:13,350 about the traffic study of Christine Johnson. I'm sorry. I am a resident. Yes. And I have been 2634 03:42:13,350 --> 03:42:20,890 sworn in. About the traffic study. So I do, you know, I live in Albuquerque and I'm always 2635 03:42:20,890 --> 03:42:28,770 in the community park. I love taking my dogs for walks, everything else. Grace Hambrook is extremely 2636 03:42:31,510 --> 03:42:38,890 They have another property across the street there that they use. 2637 03:42:39,450 --> 03:42:40,530 People like. 2638 03:42:40,930 --> 03:42:41,890 They go around. 2639 03:42:42,110 --> 03:42:50,570 They come down like if we have to make, and there's no room on that road for two cars to literally pass through safely. 2640 03:42:50,770 --> 03:42:57,170 If you come around the one corner where the park is and somebody else is flying, I'm surprised there hasn't been more accidents there. 2641 03:42:57,170 --> 03:43:02,810 If you add more traffic, especially if you add all these people, it is going to end up 2642 03:43:02,810 --> 03:43:03,090 happening. 2643 03:43:03,290 --> 03:43:04,810 Someone's going to end up dying around that corner. 2644 03:43:05,170 --> 03:43:09,030 There's the, I think it's a con cast hour or something there, I'm not sure where it is. 2645 03:43:09,570 --> 03:43:16,810 But to put that amount of traffic to go down through because people may want to try to avoid 2646 03:43:16,810 --> 03:43:25,590 the traffic going through that our townhouse developments or whatever, you're adding stress that is 2647 03:43:25,590 --> 03:43:26,310 going to be deadly. 2648 03:43:26,310 --> 03:43:28,910 I'm serious. That's all. Have a good night. Thank you. 2649 03:43:28,990 --> 03:43:30,610 Thank you. Mr. Twig. 2650 03:43:35,720 --> 03:43:40,720 Yes, our dance wig. I'm not a resident. Homeowner and Codian. Yes, I've been sworn in. 2651 03:43:41,120 --> 03:43:44,680 Just one thing. I know it's your job. I understand what council is saying. 2652 03:43:45,220 --> 03:43:49,320 Town Planner saying it's not your job to resolve litigation. 2653 03:43:49,640 --> 03:44:00,400 It's just to present your findings from this commission to the commissioners of whether they meet all the criteria put forth to them by training and zoning and the ordinances of thermont for the development. 2654 03:44:00,400 --> 03:44:11,400 But I don't know how we can say yes all the criteria has been met if the storm water management is still a issue even as part of this development. 2655 03:44:11,860 --> 03:44:17,140 How can we say yes all criteria has been met because that storm water management is still there. 2656 03:44:17,900 --> 03:44:18,660 It's there. 2657 03:44:19,760 --> 03:44:21,340 So has all criteria been met? 2658 03:44:22,320 --> 03:44:23,320 Technically no. 2659 03:44:23,320 --> 03:44:27,640 No, because that's still an issue, that does not resolve. 2660 03:44:28,320 --> 03:44:29,820 So has all the criteria been met? 2661 03:44:30,020 --> 03:44:33,660 No, it hasn't been met, because in the constant play and 2662 03:44:33,660 --> 03:44:37,320 that storm water management is there, but isn't even legal. 2663 03:44:39,700 --> 03:44:40,480 That's all I got, thank you. 2664 03:44:40,600 --> 03:44:40,840 Thank you. 2665 03:44:43,410 --> 03:44:44,730 Anybody else have public comment? 2666 03:44:48,410 --> 03:44:49,790 Last call, public comment? 2667 03:44:52,670 --> 03:44:56,490 Last call on the floor before we entertain a motion for adjournment. 2668 03:44:56,950 --> 03:44:59,110 I'll make the motion for adjournment, do I have a second? 2669 03:44:59,110 --> 03:44:59,330 Thank you. 2670 03:45:00,000 --> 03:45:03,140 All those in favor, please raise your right hand. Thank you.