1 00:00:03,280 --> 00:00:11,320 Thank you. We'll call the meeting to order at 602 with roll called, Mr. Bielter, Mr. Brian, 2 00:00:11,860 --> 00:00:21,940 Mr. Potashnik, Ms. Richter, Mr. Tomlinson, Mr. Wang, Mr. Wendley, Mr. Jaggi, Ms. Moore, and 3 00:00:22,250 --> 00:00:28,500 Ms. Bollinger. Our first item is acceptance of the agenda. As part of the acceptance 4 00:00:28,500 --> 00:00:34,540 of the agenda. I'd like to propose a break after the Olia topic. And then also I'd like 5 00:00:34,540 --> 00:00:37,660 to propose a time limit of 9.30 p.m. this evening. 6 00:00:38,640 --> 00:00:39,100 Second. 7 00:00:43,540 --> 00:00:44,140 All in favor? 8 00:00:44,680 --> 00:00:44,900 Aye. 9 00:00:46,180 --> 00:00:51,980 Okay. The next is the approval of the minutes from our November 17, 2025 Planning 10 00:00:51,980 --> 00:00:53,200 and Zoning Commission meeting. 11 00:00:54,000 --> 00:00:55,440 approval of the minutes. 12 00:00:56,600 --> 00:00:57,180 Second. 13 00:00:58,500 --> 00:00:59,260 All in favor? 14 00:01:00,060 --> 00:01:04,160 Thank you. At this time, I'll open it up for public comment. 15 00:01:04,380 --> 00:01:09,300 Anyone who wishes to speak about something not on the agenda for this evening? 16 00:01:12,740 --> 00:01:18,400 Go ahead, yes, sir. Could you come to the podium and state your name? 17 00:01:19,620 --> 00:01:23,600 My name is David Rose. I live at 10335 North Sunspot. 18 00:01:23,600 --> 00:01:31,420 And what I would like to talk about is something that is not directly on your agenda regarding 19 00:01:31,420 --> 00:01:33,180 Olia, but slightly related. 20 00:01:34,140 --> 00:01:42,800 In the revision of the plan, the road that comes near the south of the plot line now turns sharply 21 00:01:42,800 --> 00:01:43,500 northward. 22 00:01:43,860 --> 00:01:44,840 It's a new entrance. 23 00:01:45,680 --> 00:01:47,780 And nothing wrong with that necessarily. 24 00:01:47,780 --> 00:01:53,820 But there will be substantially more traffic on that road than there's ever been before that road, Julie. 25 00:01:54,500 --> 00:01:56,520 Historically, it was very rarely used. 26 00:01:57,080 --> 00:02:04,860 And at the same time, as cars make that turn to go into the neighborhood, the new neighborhood, 27 00:02:05,700 --> 00:02:11,660 their headlights are going to sweep across the whole Sunsweep neighborhood. 28 00:02:11,660 --> 00:02:17,220 I think the remedy to that problem is very simple, not really expensive. 29 00:02:17,600 --> 00:02:30,320 I'm just simply asking you to consider asking them in the plan to consider putting in some trees and shrubs to take care of that arc so that, you know, all night just have lights come over and over. 30 00:02:31,060 --> 00:02:31,620 Okay. 31 00:02:31,940 --> 00:02:32,300 That's it. 32 00:02:32,540 --> 00:02:32,860 Thank you. 33 00:02:33,100 --> 00:02:33,480 Thank you. 34 00:02:39,820 --> 00:02:46,380 Okay, we're going to start with our new business and we'll open public hearing application 25036. 35 00:02:46,380 --> 00:02:52,260 A conditional use permit for Dewey's Pizza, located at 736 North New Ballas Road, 36 00:02:52,400 --> 00:02:53,500 within Creek 4 Plaza. 37 00:02:57,230 --> 00:03:01,290 If anyone's speaking this evening, please come forward to be sworn in, 38 00:03:01,430 --> 00:03:03,030 and we have on the line. 39 00:03:05,400 --> 00:03:06,620 Raise your right hands, please. 40 00:03:07,260 --> 00:03:09,540 Do you sound like we're starting to tell the truth, the whole truth, 41 00:03:09,640 --> 00:03:11,240 and nothing but the truth, so I'll help you back. 42 00:03:11,440 --> 00:03:13,480 Thank you. 43 00:03:14,780 --> 00:03:15,280 Thank you. 44 00:03:18,960 --> 00:03:19,360 All right. 45 00:03:19,500 --> 00:03:21,960 Heath, are you able to share your screen for your presentation? 46 00:03:22,200 --> 00:03:22,540 Thank you. 47 00:03:46,430 --> 00:03:47,050 Can you see that? 48 00:03:47,050 --> 00:03:50,810 We can, if you could please state your name and address for the record. 49 00:03:51,710 --> 00:03:57,070 My name is Heath Trossel at 605 Valley Woods Court in Cincinnati, Ohio. 50 00:04:02,290 --> 00:04:02,630 Thank you. 51 00:04:08,530 --> 00:04:13,430 Dewey's Pizza is a privately owned restaurant chain that's become a staple in the St. Louis community. 52 00:04:14,930 --> 00:04:23,350 Dewey's desires to expand its footprint and bring its history of quality food and service to the city of Creefcore. 53 00:04:23,350 --> 00:04:42,970 Dewey's has a history of community outreach and community service projects, and with the addition of the proposed facility, Dewey's will be able to accommodate an increasing number of customers while providing a more convenient pickup location for residents in the city, as well as lunch accommodations for local employees. 54 00:04:42,970 --> 00:04:49,850 As an interior tenant finished proposed project in an existing poor business 55 00:04:49,850 --> 00:04:55,430 district building, the proposed facility only provides positive impact on the 56 00:04:55,430 --> 00:04:59,390 surrounding residents and businesses and requires no change to the existing 57 00:04:59,390 --> 00:05:04,830 building exterior landscape design. As a quick service pickup location with 58 00:05:04,830 --> 00:05:09,210 limited seating, the proposed facility will not cause harm to the existing 59 00:05:09,210 --> 00:05:15,090 parking facilities and will operate as more of a retail food establishment rather than 60 00:05:15,090 --> 00:05:16,650 a full service restaurant. 61 00:05:17,730 --> 00:05:24,330 Dubies has a current example of this in Southampton, which they opened last year. 62 00:05:25,070 --> 00:05:29,150 They're kind of in a phase where they're doing some infill projects to make their 63 00:05:29,150 --> 00:05:33,750 product more accessible to the greater St. Louis area. 64 00:05:33,750 --> 00:05:41,600 So you can see the Creefcore Plaza. I think the majority of this information 65 00:05:41,600 --> 00:05:47,340 is a part of our application process. There's numerous parking around the 66 00:05:47,340 --> 00:05:53,620 building. Dewey's proposed tenant space is an existing or was an existing 67 00:05:53,620 --> 00:05:58,860 retail space and Dewey's would be operating it out of out of it as a 68 00:05:58,860 --> 00:06:06,940 Retail Center for Dewey's food service pickup. This is an existing site plan and 69 00:06:07,540 --> 00:06:18,880 survey and this is our interior floor print which shows 16 seats, counter service, 70 00:06:19,360 --> 00:06:24,580 a pickup point. So if you enter, this is more of your carry out pickup point 71 00:06:24,580 --> 00:06:32,360 and then customers would leave and those that want to dine in or order on the spot can order 72 00:06:32,840 --> 00:06:43,400 and then circle around and leave. It's a 27 underscore foot retail space that I read the 73 00:06:43,400 --> 00:06:50,280 staff report and it doesn't sound like there's any issues in the staff report that I need to 74 00:06:50,280 --> 00:06:54,840 address so I'd like to just answer any questions that you would have. 75 00:07:02,750 --> 00:07:03,930 Anyone have questions? 76 00:07:05,730 --> 00:07:06,330 Okay. 77 00:07:07,170 --> 00:07:08,650 No questions here at this point. 78 00:07:08,750 --> 00:07:09,130 Thank you. 79 00:07:24,660 --> 00:07:24,980 Great. 80 00:07:25,100 --> 00:07:26,340 Bethany Moore, City Planner. 81 00:07:27,300 --> 00:07:31,200 So this is a conditional use permit for Dewey's Pizza located at 736 82 00:07:31,200 --> 00:07:33,540 North New Ballas Road within Creek 4 Plaza. 83 00:07:39,460 --> 00:07:42,520 So the request is for a CUP for this location. 84 00:07:43,340 --> 00:07:47,180 It is a limited service restaurant, which is a conditional use in all of our zoning districts. 85 00:07:47,920 --> 00:07:55,300 There are no exterior changes to the site, so there will only be interior changes to outfit the area for the pizza restaurant. 86 00:07:55,940 --> 00:07:59,500 There will be 16 indoor seats and 10 employees at busiest shift. 87 00:08:00,300 --> 00:08:09,480 There was a proposal for 22 indoor seats, but because of the parking at this location, they did have to downgrade it to 16 indoor seats 88 00:08:09,480 --> 00:08:18,280 because there's not enough parking to accommodate that, and when there are 16 seats or less, parking required is 4 per 1,000 square feet, just like with typical retail. 89 00:08:19,680 --> 00:08:28,680 The hours of operation will be from 11 a.m. to 9 p.m. Monday through Thursday, 11 a.m. to 10 p.m. Friday through Saturday, and 12 p.m. to 9 p.m. on Sunday. 90 00:08:29,540 --> 00:08:32,440 And this location is within our CB Corps business district. 91 00:08:33,940 --> 00:08:35,920 Again, just here's the site plan. 92 00:08:36,060 --> 00:08:37,920 Here's the location within Creep Court Plaza. 93 00:08:38,860 --> 00:08:41,640 And then the floor plan with the 16 seats. 94 00:08:43,740 --> 00:08:45,340 There's no exterior changes. 95 00:08:45,560 --> 00:08:47,460 The landscaping is in good condition. 96 00:08:47,620 --> 00:08:48,920 The parking lots in good condition. 97 00:08:50,860 --> 00:08:54,480 So the condition of approval just include the hours of operation. 98 00:08:54,820 --> 00:08:58,140 And then again, that maximum seating is limited to 16 indoor seats 99 00:08:58,140 --> 00:09:00,160 because of the available parking on site. 100 00:09:00,160 --> 00:09:02,400 Any questions? 101 00:09:03,140 --> 00:09:04,120 I appreciate it. 102 00:09:06,620 --> 00:09:06,820 Yes. 103 00:09:07,900 --> 00:09:08,440 Parking lots. 104 00:09:08,980 --> 00:09:10,120 Very large parking lot. 105 00:09:10,180 --> 00:09:10,540 It is. 106 00:09:10,940 --> 00:09:12,780 And there's parking constraints, right? 107 00:09:13,040 --> 00:09:13,520 There is. 108 00:09:13,920 --> 00:09:19,840 So some of the older restaurants, which would be Pasta House and 109 00:09:21,040 --> 00:09:22,020 First Watch. 110 00:09:22,260 --> 00:09:23,160 First Watch. 111 00:09:24,180 --> 00:09:25,900 And I think even 112 00:09:27,120 --> 00:09:27,740 Kadova. 113 00:09:27,820 --> 00:09:28,200 Kadova. 114 00:09:28,420 --> 00:09:28,640 Thank you. 115 00:09:28,640 --> 00:09:35,700 Those have older CUPs, and those CUPs are based on total occupancy and not number of seats. 116 00:09:36,340 --> 00:09:45,300 So if the developer would like to come in and, you know, we could rework those CUPs so that it meets our current standards, 117 00:09:45,420 --> 00:09:50,560 our current way of counting seats, then maybe they would have some wiggle room with their parking. 118 00:09:50,700 --> 00:09:55,500 But currently as it stands with those existing CUPs, we have to count occupancy and not just seats. 119 00:09:55,500 --> 00:10:00,040 So they are tight on parking now, because of that. 120 00:10:05,860 --> 00:10:06,320 Any other questions? 121 00:10:09,110 --> 00:10:11,910 Would there be parking available if we recalculated? 122 00:10:12,350 --> 00:10:13,250 There might be. 123 00:10:13,550 --> 00:10:15,370 We would just have to check the number of seats, 124 00:10:15,390 --> 00:10:18,730 because that wasn't taken into consideration when their CUPs were approved. 125 00:10:27,230 --> 00:10:31,950 I think I just would say, I find it helpful when you put the chart in there 126 00:10:31,950 --> 00:10:34,990 so we can actually see the calculations, maybe in the future. 127 00:10:35,550 --> 00:10:35,910 Okay. 128 00:10:36,470 --> 00:10:38,790 In the staff report or in the staff report? 129 00:10:38,790 --> 00:10:39,830 Okay. 130 00:10:44,940 --> 00:10:45,660 Any other questions? 131 00:10:47,660 --> 00:10:51,700 Do we want to get this evening's board away with shopping some for the future? 132 00:10:52,820 --> 00:10:53,380 I 133 00:10:55,520 --> 00:11:00,860 guess the question would be, it's not changing their configuration really as it's set up today. 134 00:11:01,220 --> 00:11:08,200 So where it is, if they wanted to, we could come back to recalculate everything, right? 135 00:11:08,680 --> 00:11:11,160 Because it's not really changing their layout. 136 00:11:11,480 --> 00:11:11,840 Correct. 137 00:11:11,840 --> 00:11:18,600 It's just those older CUPs, if they would like to come in, we can amend them, basically, 138 00:11:18,780 --> 00:11:23,100 so that they would take into account the existing seating, but it's not required at this point, 139 00:11:23,160 --> 00:11:24,160 because they're continuously operating. 140 00:11:25,260 --> 00:11:32,960 So you mean the processes that the property would have to come into the fight 141 00:11:32,960 --> 00:11:34,460 or reintegration? 142 00:11:35,180 --> 00:11:38,260 They would have to – the individual CUPs would have to be amended. 143 00:11:38,480 --> 00:11:40,980 So we would have to amend all of those separate CUPs. 144 00:11:40,980 --> 00:11:42,720 and that's triggered by them. 145 00:11:43,320 --> 00:11:43,800 Correct. 146 00:11:45,580 --> 00:11:47,240 Jason Jagger, director of community volume. 147 00:11:47,340 --> 00:11:48,820 Just to add to the discussion a little bit here. 148 00:11:49,420 --> 00:11:54,940 So the existing use is a retail use, which is our four spaces per thousand. 149 00:11:55,100 --> 00:11:56,000 So that's not changing. 150 00:11:56,560 --> 00:12:00,980 And so we talked with the applicant about the need to perform a comprehensive parking study 151 00:12:00,980 --> 00:12:02,920 if they want additional seats beyond that. 152 00:12:03,400 --> 00:12:07,460 Like Bethany said, we have CUPs here that are really, really old, 153 00:12:07,460 --> 00:12:11,380 and we're not quite sure if they count them based on the interior, you know, 154 00:12:11,440 --> 00:12:13,480 the number of seats that says total occupancy. 155 00:12:13,780 --> 00:12:17,500 So we would be required to do a lot of research in order to answer that fully. 156 00:12:18,000 --> 00:12:21,440 So in the interest of time, and it was acceptable to the applicant, 157 00:12:21,860 --> 00:12:26,880 they agreed to just reduce it to 16, which our ordinance says we count that as a retail use, 158 00:12:27,100 --> 00:12:28,440 and that's how they want to move forward. 159 00:12:28,700 --> 00:12:32,600 But we do have the condition in the ordinance that says, you know, 160 00:12:32,660 --> 00:12:36,520 the zoning minister can approve additional seats with verification of parking. 161 00:12:36,520 --> 00:12:43,980 So if this is something in the future, I think, you know, we could look at to see, you know, do a very thorough review. 162 00:12:44,120 --> 00:12:47,200 And if there's access parking at that time, we could allow additional seats. 163 00:12:47,300 --> 00:12:49,680 So we do have that condition in there just so you know. 164 00:12:51,240 --> 00:12:53,920 But they're comfortable moving forward with 16 seats. 165 00:12:55,240 --> 00:12:55,860 Thank you. 166 00:12:57,280 --> 00:12:57,880 Would 167 00:13:01,630 --> 00:13:06,590 anyone, does anyone from the public have anything that they'd like to share about this 168 00:13:07,630 --> 00:13:09,850 public hearing for duees? 169 00:13:12,780 --> 00:13:13,000 Please. 170 00:13:14,340 --> 00:13:17,300 Following in the exhibition of the record of this public hearing. 171 00:13:17,800 --> 00:13:21,540 Documentation and possession of the city clerk reflecting the public notice that's been 172 00:13:21,540 --> 00:13:21,960 provided. 173 00:13:22,560 --> 00:13:26,720 Staff report and the two PowerPoint presentations that have been given. 174 00:13:27,440 --> 00:13:31,960 The City Code of Ordinances and Charter, the City Comprehensive Plan and the public file 175 00:13:31,960 --> 00:13:33,700 regarding the CUP applicants. 176 00:13:35,260 --> 00:13:40,740 I move to recommend approval of the conditional use permit for dewy speech that are located 177 00:13:40,740 --> 00:13:46,760 at 736 North New Dallas Road within Creve Court Plaza, subject to the conditions discussed 178 00:13:46,760 --> 00:13:54,220 in the staff report and draft ordinance for the meeting on December 1st, 2015. 179 00:13:54,620 --> 00:13:55,160 December 15th. 180 00:13:55,460 --> 00:13:56,600 December 15th. 181 00:13:56,600 --> 00:13:58,960 December 15, 2025. 182 00:14:01,120 --> 00:14:02,600 So, Mr. Hielter. 183 00:14:03,000 --> 00:14:03,240 Aye. 184 00:14:03,540 --> 00:14:04,060 Mr. O'Brien. 185 00:14:04,640 --> 00:14:04,800 Aye. 186 00:14:04,960 --> 00:14:05,800 Mr. Petashnik. 187 00:14:05,960 --> 00:14:06,100 Aye. 188 00:14:06,360 --> 00:14:06,940 Mr. Richter. 189 00:14:07,120 --> 00:14:07,420 Aye. 190 00:14:07,680 --> 00:14:08,480 Mr. Tomlinson. 191 00:14:08,840 --> 00:14:09,040 Aye. 192 00:14:09,200 --> 00:14:09,700 Mr. Wang. 193 00:14:09,880 --> 00:14:10,020 Aye. 194 00:14:10,260 --> 00:14:11,020 And I vote aye. 195 00:14:13,480 --> 00:14:13,980 Thank you. 196 00:14:14,080 --> 00:14:18,640 This item will be forwarded to the City Council at their meeting on January 12, 197 00:14:19,540 --> 00:14:20,020 2026. 198 00:14:20,600 --> 00:14:20,880 Thank you. 199 00:14:26,830 --> 00:14:32,290 The next item on the agenda is a public hearing application 25038, 200 00:14:32,290 --> 00:14:38,970 A conditional use permit for Einstein Brothers Bay but also located at 12505 Olive Boulevard, 201 00:14:39,510 --> 00:14:42,050 Suite A within the Heritage Place Development. 202 00:14:43,130 --> 00:14:47,470 If anyone speaking could please come forward to be sworn in. 203 00:14:49,460 --> 00:14:50,220 Yes, I'm online. 204 00:14:51,260 --> 00:14:51,820 Thank you. 205 00:14:53,560 --> 00:14:56,260 Raise your, excuse me, raise your right hand please. 206 00:14:56,260 --> 00:14:59,780 Do you sound like we started to tell the truth, the whole truth, and nothing but the truth? 207 00:15:02,680 --> 00:15:07,840 Thank you. All right, Peggy, you can share your screen now and then introduce yourself. 208 00:15:14,030 --> 00:15:18,290 All right, can everyone see that? Not yet. Now we can. 209 00:15:18,710 --> 00:15:24,570 Okay, awesome. My name is Peggy Schindler and I am the senior project manager with CSHQA. 210 00:15:25,290 --> 00:15:31,390 We are the architectural firm representing Einstein Brothers. Also on the line is Leslie Haver. 211 00:15:31,390 --> 00:15:35,250 She is the Senior Director of Store Design with Einstein Brothers Bagels. 212 00:15:36,610 --> 00:15:41,650 And just to give you a brief overview of the business, we are, again, looking at a space 213 00:15:42,170 --> 00:15:45,510 at 1-2-5-0-5, Olive Boulevard in Creepcore. 214 00:15:48,090 --> 00:15:53,210 And Einstein Brothers is the nation's largest fast-casual bagel brand, and is very excited 215 00:15:53,210 --> 00:15:57,510 to bring crevable coffee, bagels, sandwiches, and more to your community. 216 00:15:58,430 --> 00:16:06,410 Einstein's is quite passionate about what they do and feel that Creepcore Missouri is a perfect place and a perfect fit for their brand. 217 00:16:07,450 --> 00:16:13,790 The new store design is crafted with the intention of being a warm and inviting space for the community to gather in. 218 00:16:14,750 --> 00:16:22,270 And during construction, Einstein's works very hard to minimize the noise impact to its surrounding tenants, businesses, and to the community. 219 00:16:22,930 --> 00:16:33,450 For example, in this location, construction of the project will be completed during normal business hours, and the majority of the work will be done on the inside of the tenant space. 220 00:16:34,870 --> 00:16:49,570 The only exterior work planned for this project is new signage, identifying Einstein Brothers to their customer base in Creep Corps, and no other impacts to the existing building or landscaper plan for this project. 221 00:16:50,510 --> 00:17:00,690 And after Einstein Brothers opens, they really pride themselves in becoming members of the local community and being an open and accessible place for everyone to enjoy the space. 222 00:17:01,930 --> 00:17:07,550 Einstein Brothers plans to serve your community from 6 a.m. to 2 p.m., seven days a week. 223 00:17:10,480 --> 00:17:16,380 And this slide shows an overall view of Heritage Place where the subject property is. 224 00:17:16,940 --> 00:17:21,640 And if you can see my cursor, on the upper right hand side, you can see the project location. 225 00:17:23,420 --> 00:17:30,000 And Heritage Place is anchored by other several large tenants such as Petco, Marshals, TJ Maxx, Office Depot, etc. 226 00:17:31,140 --> 00:17:38,340 And is surrounded by Ross Avenue and Olive Boulevard, which is the corner of the subject property, as well as Heritage Place. 227 00:17:38,340 --> 00:17:47,130 and zooming in a little bit on the location the area in blue located with 228 00:17:47,130 --> 00:17:52,370 a red dot and 12505 is a subject property and the end of the building that 229 00:17:52,370 --> 00:17:58,970 I sense is looking to build out and there are 18 standard parking spaces 230 00:17:58,970 --> 00:18:05,410 directly in front of the building and an additional two handicapped spaces 231 00:18:05,410 --> 00:18:11,750 right in front of the building. The accessible path between the two ADA spaces is a short 232 00:18:12,530 --> 00:18:22,670 walk from the center of the two ADA spaces across a flat sidewalk into the Einstein Brothers 233 00:18:22,670 --> 00:18:29,730 proposed space. And the location is accessible from Ross Avenue by taking it right into 234 00:18:29,730 --> 00:18:35,630 the drive aisle and a left into the center. It's also accessible easily from 235 00:18:35,630 --> 00:18:39,610 all of Boulevard taking a right and coming around and taking a right into 236 00:18:39,610 --> 00:18:47,350 the center. The former tenant of the 12505 space was a retail comfort shoes 237 00:18:48,570 --> 00:18:55,030 and the adjacent tenant is an America's best retail. And finally there is an 238 00:18:55,030 --> 00:18:59,050 existing trash enclosure that's in good condition right at the beginning of 239 00:18:59,050 --> 00:19:04,230 dry vial so easy access for the trucks to remove the waste from that enclosure. 240 00:19:07,990 --> 00:19:12,310 And then moving to the front of the building, the east elevation is the front. 241 00:19:13,190 --> 00:19:18,630 There's also a north elevation which is the side of the building and the west elevation is the 242 00:19:19,150 --> 00:19:24,370 back elevation of the building. Again there's no changes to the design of the building or 243 00:19:24,370 --> 00:19:30,950 landscape. The only change would be adding a sign to the building itself and then 244 00:19:31,930 --> 00:19:37,530 Logo signage within the window again identifying the business to new patrons and 245 00:19:40,150 --> 00:19:41,870 then moving inside and 246 00:19:41,870 --> 00:19:48,170 If Leslie is able to speak if not, I can take this Leslie. Would you like to talk about the interior design? 247 00:19:50,310 --> 00:19:51,390 Sure, if that's acceptable 248 00:19:54,850 --> 00:19:55,670 Can you hear me? 249 00:19:56,230 --> 00:19:58,130 Yes, we can okay 250 00:19:58,130 --> 00:20:03,870 Yeah, I just wanted to point out this this rendering is our new design. So we we just 251 00:20:04,710 --> 00:20:05,550 recreated our 252 00:20:05,550 --> 00:20:13,470 interior asset this last year so we only have four of these open around the 253 00:20:13,470 --> 00:20:18,970 country and this would be the first one in Missouri along we have we have a 254 00:20:18,970 --> 00:20:25,250 number of remodels we did in Ohio but so this is one of nine of this prototype 255 00:20:25,250 --> 00:20:30,050 that we have open to the public and it's as you could see it's just a new 256 00:20:30,050 --> 00:20:39,050 modern upgrade and creating some interior space for our guests and ease of operations for our 257 00:20:39,050 --> 00:20:45,770 employees as well as simplifying, you know, the order ahead and pick up portfolio that we've 258 00:20:46,200 --> 00:20:48,590 seen grow since COVID. 259 00:20:51,280 --> 00:20:52,340 Thank you, Leslie. 260 00:20:54,840 --> 00:20:59,080 So taking this rendering, this is a prototypical 261 00:20:59,080 --> 00:21:03,820 view of the new design that Leslie mentioned and now applying it to the 262 00:21:03,820 --> 00:21:08,540 actual space and creep core. When you walk in the front door that order pickup 263 00:21:08,540 --> 00:21:13,820 area is right to your left so it's an easy access in and out for any online 264 00:21:13,820 --> 00:21:19,900 orders and then if you choose to design to dine in you would queue to the left 265 00:21:19,900 --> 00:21:25,400 and right. This area is where you know the food and beverage displays would 266 00:21:25,400 --> 00:21:29,260 be where the orders would be placed directly behind here in the back 267 00:21:29,260 --> 00:21:32,820 service line is where you would see sandwiches being made or bagels being 268 00:21:32,820 --> 00:21:38,440 toasted to really the theater of the bakery and then continuing down this 269 00:21:38,440 --> 00:21:44,100 way is where you'd fill your coffee and sit down and there are several 270 00:21:44,100 --> 00:21:49,400 different styles of seating available for a total of 40 interior seats which 271 00:21:49,400 --> 00:21:53,640 includes three separate areas for accessible dining space, 272 00:21:54,160 --> 00:21:57,640 both at a bankhead seating, loose table seating, 273 00:21:57,860 --> 00:22:00,360 which can be configured for a single person, 274 00:22:01,060 --> 00:22:02,980 two people up to, you know, much larger, 275 00:22:03,460 --> 00:22:05,760 you know, be able to accommodate much larger groups. 276 00:22:06,480 --> 00:22:10,160 There are a larger dining table experience, 277 00:22:10,340 --> 00:22:11,360 as well as counter seating, 278 00:22:11,860 --> 00:22:14,320 and a lower counter space, again, for accessible seating. 279 00:22:15,420 --> 00:22:18,560 There's, of course, two restrooms that'll be available to the guests, 280 00:22:18,560 --> 00:22:23,660 And then there's a door that separates the back of house, so that's not really in view of the customer. 281 00:22:23,840 --> 00:22:32,400 So all of the bakery prep, cleaning, walk-in coolers, freezers, office area, dry storage, etc. would be hidden from view. 282 00:22:33,180 --> 00:22:37,460 So the total square footage is approximately 2,453 square feet. 283 00:22:39,060 --> 00:22:47,740 So in conclusion, ISEINs really starts to be the kind of place that builds up the community and provides a space where the community desires to come together. 284 00:22:47,740 --> 00:22:50,500 So we thank you for your time and let us know if you have any questions. 285 00:22:56,770 --> 00:22:57,810 Anyone questions? 286 00:23:01,790 --> 00:23:03,530 Okay, thank you very much. 287 00:23:04,310 --> 00:23:04,550 Thank you. 288 00:23:05,150 --> 00:23:05,710 Is 289 00:23:22,350 --> 00:23:22,870 that any more? 290 00:23:23,090 --> 00:23:23,550 City planner. 291 00:23:24,770 --> 00:23:29,110 So this is a conditional use permit for Einstein's brother's bagels located 292 00:23:29,110 --> 00:23:33,470 at 1205 Olive Boulevard Suite A within the Heritage Place Development. 293 00:23:35,490 --> 00:23:40,610 So this request is for this outlaw building here within the heritage place development, 294 00:23:40,750 --> 00:23:43,470 and that is the only portion of the property that is within Creepore. 295 00:23:44,510 --> 00:23:47,170 The rest is actually in St. Louis County. 296 00:23:49,790 --> 00:23:54,770 Again, it is a limited service restaurant, which is the conditional use in all of our zoning districts. 297 00:23:55,430 --> 00:23:56,790 There are no exterior changes. 298 00:23:57,250 --> 00:24:01,270 There are 40 indoor seats proposed and four employees at busiest shift. 299 00:24:01,270 --> 00:24:04,550 hours of operation will be from 6 a.m. to 2 p.m. every day. 300 00:24:05,230 --> 00:24:08,190 And it's within our CB core business district. 301 00:24:10,470 --> 00:24:12,510 So again, here is the proposed site plan. 302 00:24:12,690 --> 00:24:14,790 It is within the Heritage Place Development, 303 00:24:15,070 --> 00:24:17,010 which has all of this shared parking, 304 00:24:17,170 --> 00:24:18,690 which is shared amongst all of the users. 305 00:24:19,390 --> 00:24:21,950 And then the proposed floor plan here. 306 00:24:27,220 --> 00:24:31,140 So maximum seating permitted is limited to 40 indoor seats. 307 00:24:31,960 --> 00:24:34,580 And the hours of operation are from 6 to 2, 308 00:24:34,580 --> 00:24:36,260 And those are the conditions of approval. 309 00:24:36,620 --> 00:24:38,620 Staff doesn't have any other concerns with this location. 310 00:24:40,320 --> 00:24:41,100 Any questions? 311 00:24:43,360 --> 00:24:43,880 Questions? 312 00:24:45,620 --> 00:24:46,140 No. 313 00:24:46,480 --> 00:24:47,280 Thank you, Bethany. 314 00:24:47,680 --> 00:24:50,280 I'll open it up to the public for any questions. 315 00:24:57,100 --> 00:24:59,920 I offer the following exhibits into the record of this public hearing. 316 00:25:00,200 --> 00:25:02,360 Documentation and possession of the City Clerk, 317 00:25:02,600 --> 00:25:04,440 collecting the public notice that's been provided 318 00:25:05,060 --> 00:25:07,580 with two PowerPoint presentations in the staff report. 319 00:25:08,420 --> 00:25:12,660 The City Code of Ordinances and Charter of the City Comprehensive Plan and the 320 00:25:12,660 --> 00:25:19,640 public file regarding the CUP happened to you. I move to recommend approval of 321 00:25:19,640 --> 00:25:26,780 the conditional use permit for Einstein-Babel, Silkhead and 12505, all of 322 00:25:26,780 --> 00:25:31,620 Boulevard within Heritage Place Shopping Center. Subjects to the conditions 323 00:25:31,620 --> 00:25:35,440 discussed in the staff report and draft ordinance for the meeting of 324 00:25:35,440 --> 00:25:37,420 December 15, 2025. 325 00:25:38,440 --> 00:25:38,780 Second. 326 00:25:39,320 --> 00:25:39,900 Thank you. 327 00:25:40,580 --> 00:25:41,320 Mr. Bielter. 328 00:25:41,900 --> 00:25:42,220 Aye. 329 00:25:42,600 --> 00:25:43,160 Ms. O'Brien. 330 00:25:44,200 --> 00:25:44,500 Aye. 331 00:25:45,000 --> 00:25:45,880 Ms. Schnick. 332 00:25:46,380 --> 00:25:46,920 Aye. 333 00:25:47,260 --> 00:25:47,940 Ms. Richter. 334 00:25:48,240 --> 00:25:48,420 Aye. 335 00:25:48,600 --> 00:25:49,340 Mr. Tomlinson. 336 00:25:49,660 --> 00:25:49,840 Aye. 337 00:25:50,000 --> 00:25:50,460 Mr. White. 338 00:25:50,620 --> 00:25:50,820 Aye. 339 00:25:51,060 --> 00:25:51,820 And I vote aye. 340 00:25:55,430 --> 00:25:55,890 Thank you. 341 00:25:55,950 --> 00:26:02,090 This item will also be forwarded to the City Council with a favorable recommendation at their meeting on January 12, 2026. 342 00:26:02,670 --> 00:26:03,210 Thank you. 343 00:26:03,210 --> 00:26:11,940 Our next item on the agenda is application 25037, a site development plan and associated 344 00:26:11,940 --> 00:26:17,720 site concept plan amendment for building additions on the Wittfield School campus located at 345 00:26:17,720 --> 00:26:19,800 175 South Mason Road. 346 00:26:32,620 --> 00:26:33,340 Good evening. 347 00:26:33,700 --> 00:26:37,020 I'm Lisa Griffin with Bond Architects here to describe the project. 348 00:26:59,060 --> 00:27:04,140 So this is a three-part project, part of which is the intellectual comments for 349 00:27:04,140 --> 00:27:04,800 library renovation. 350 00:27:05,300 --> 00:27:08,900 We are infilling the current pipe or courtyard to be an extension of that library. 351 00:27:09,300 --> 00:27:13,020 We're also adding a storm shelter, which is an athletic facility. 352 00:27:16,480 --> 00:27:21,960 So this addition is located on the mirror of the building here. 353 00:27:24,320 --> 00:27:27,440 So it maintains the same entry and exiting from the site. 354 00:27:27,920 --> 00:27:31,840 We're also working with MSD to determine any storm water runoff needs 355 00:27:31,840 --> 00:27:34,860 when we'll be fully compliant with any of their requirements. 356 00:27:35,480 --> 00:27:40,920 We're going through the conceptual review with them now, so we're getting all those 357 00:27:40,920 --> 00:27:43,880 details hammered out and look forward to completing that. 358 00:27:44,900 --> 00:27:48,960 So this part of the project is located, as I said, on the rear of the site adjacent to 359 00:27:48,960 --> 00:27:51,700 their existing gymnasium and their middle school soccer field. 360 00:27:52,780 --> 00:27:57,000 We will be extending the fire access road to maintain full fire access around the 361 00:27:57,000 --> 00:27:57,600 entire building. 362 00:28:00,400 --> 00:28:05,740 and internally the project is accessed from the inside of the school or from 363 00:28:05,740 --> 00:28:07,580 the rear side if you're just a visitor. 364 00:28:09,680 --> 00:28:11,080 So as I mentioned we're working with 365 00:28:11,080 --> 00:28:15,320 MSD. Originally we were thinking that we could just alter their existing 366 00:28:16,260 --> 00:28:21,880 stormwater runoff system. However there are a couple IOUs for previous 367 00:28:21,880 --> 00:28:25,840 projects and now we're disturbing over one acre of land and so we're going 368 00:28:25,840 --> 00:28:35,000 to a little bit larger drainage area. So we'll be incorporating a kind of landscape detention 369 00:28:35,000 --> 00:28:40,140 basin here with an outfall and connecting to the existing stormwater system. 370 00:28:42,760 --> 00:28:44,940 So again, 371 00:28:45,020 --> 00:28:48,280 this will be a landscaped area. Most of the time it will be dry unless we have a really 372 00:28:48,280 --> 00:28:53,540 heavy rain, in which case there will be water in the basin that will just be held 373 00:28:53,540 --> 00:28:57,540 until it can be filtered and gone back into the storm system. 374 00:29:02,080 --> 00:29:05,200 And plan-wise, as I said, it's a three-part project. 375 00:29:05,560 --> 00:29:07,580 So we have a renovation, which is located here. 376 00:29:07,840 --> 00:29:08,920 This is their existing library. 377 00:29:10,080 --> 00:29:14,000 Generally, we'll be adding offices and seating space 378 00:29:14,000 --> 00:29:15,060 for the students. 379 00:29:15,800 --> 00:29:18,720 And then we'll be infilling an existing exterior courtyard 380 00:29:18,720 --> 00:29:20,600 to be an extension of that library space. 381 00:29:21,280 --> 00:29:25,080 There will be a glass skylight to occupy most of the roof, 382 00:29:25,080 --> 00:29:29,420 and it will be a nice space that students can have presentations, and the school can 383 00:29:29,420 --> 00:29:32,720 use as more of a gathering space as well, in addition to the library essential. 384 00:29:36,880 --> 00:29:41,920 The storm shelter is adjacent to the existing gymnasiums and is accessed both from that 385 00:29:41,920 --> 00:29:44,480 intellectual common space and the existing gymnasium. 386 00:29:45,760 --> 00:29:51,140 So the lower level is mostly a wrestling gym, we will also have provisions for volleyball. 387 00:29:51,140 --> 00:29:59,700 And then, on the upper level, we have a small number of bleachers just for people to come 388 00:29:59,700 --> 00:29:59,920 watch. 389 00:30:01,250 --> 00:30:05,670 Additionally, there's also a climbing wall in this area to support the school's climbing 390 00:30:05,670 --> 00:30:12,390 club, but generally it's a practice gym, and it is sized as a storm shelter for all of the 391 00:30:12,390 --> 00:30:18,450 school occupants, in addition to if there was a full game up in one of the other gyms. 392 00:30:19,170 --> 00:30:22,670 If those bleachers were full, this storm shelter can accommodate all of those occupants. 393 00:30:25,710 --> 00:30:30,370 Exterior-wise, we'll be matching the existing building as closely as possible, so we've 394 00:30:30,370 --> 00:30:36,190 sent our masonry breath out to manage the berth. 395 00:30:36,530 --> 00:30:38,030 So we have a berth board that matches. 396 00:30:38,430 --> 00:30:40,810 It's a custom blend to match that existing gym 397 00:30:41,450 --> 00:30:42,650 that you can see over on the left. 398 00:30:43,330 --> 00:30:46,370 In addition to a red CMU, it's a split-based CMU 399 00:30:46,370 --> 00:30:46,750 been here. 400 00:30:47,730 --> 00:30:50,770 That'll be kind of in the center and the backside of this. 401 00:30:51,210 --> 00:30:54,270 So here is the CMU on the backside. 402 00:30:54,690 --> 00:30:56,810 And then each corner is brand to match 403 00:30:56,810 --> 00:30:57,610 that existing building. 404 00:30:58,310 --> 00:30:59,630 The top portion of the building 405 00:30:59,630 --> 00:31:03,270 is going to be an epist to match that existing adjacent as well. 406 00:31:06,400 --> 00:31:10,660 So here you can see the brickboard and how it matches the rest of the building. 407 00:31:11,140 --> 00:31:14,960 And then there is some exterior lighting that will just go over the exterior doors. 408 00:31:15,300 --> 00:31:16,700 That's really just an egress component. 409 00:31:20,980 --> 00:31:21,340 That's it. 410 00:31:24,440 --> 00:31:24,660 Questions? 411 00:31:25,160 --> 00:31:28,480 I had some questions about near work with MSD. 412 00:31:28,660 --> 00:31:30,040 Where are you exactly with that? 413 00:31:30,480 --> 00:31:34,840 And do you have the designs or how far along are you wanting to ask? 414 00:31:34,840 --> 00:31:39,960 We're within the conceptual review, so usually we like to get ahead of them or ahead of the 415 00:31:39,960 --> 00:31:43,820 bidding process as early as possible to make sure that we're on the same page with MSD. 416 00:31:44,360 --> 00:31:47,700 So our civil engineers have been working with them for about six weeks now, 417 00:31:47,900 --> 00:31:52,600 and we just got word in the last few days about that upgraded detention basin. 418 00:31:53,300 --> 00:31:57,800 So they're working to implement that, and then that'll all be wrapped into our final design. 419 00:31:57,800 --> 00:32:04,560 And where does, let's say the detention basin fills up, where does that water go? 420 00:32:05,640 --> 00:32:11,380 So the intention is that we don't create runoff for the rest of the community. 421 00:32:12,440 --> 00:32:18,180 So in an extreme rainfall, the water will pool in this area. 422 00:32:18,520 --> 00:32:23,100 And then there's an outfall structure that you can see here. 423 00:32:23,100 --> 00:32:29,160 So for that really worst case, the detention basin gets full, that water can flow into that 424 00:32:29,160 --> 00:32:33,780 fall structure and then into the rest of the storm system as it's connected to the 425 00:32:33,780 --> 00:32:35,240 south area, such as here. 426 00:32:36,760 --> 00:32:41,160 So that's really only in the worst case, you know, 100-year type event. 427 00:32:43,260 --> 00:32:45,840 Otherwise water is held here and it's filtered down through. 428 00:32:46,040 --> 00:32:51,820 So it's a little bit hard to see on this image, but this is showing kind of like 429 00:32:51,820 --> 00:32:57,480 that filtering component of the detention basin, so the water kind of seeps into the 430 00:32:57,480 --> 00:33:00,840 ground a little bit more slowly to filter and clean it before it goes on. 431 00:33:00,860 --> 00:33:05,300 So if you all done all of your engineering and design work for it, are you relating 432 00:33:05,300 --> 00:33:07,380 to your tremendous space to what they want? 433 00:33:07,960 --> 00:33:12,260 We've heard that this is their intention, this is what they want, and our engineers 434 00:33:12,260 --> 00:33:13,400 are working to implement that. 435 00:33:22,990 --> 00:33:23,590 Other questions? 436 00:33:28,840 --> 00:33:29,000 Okay. 437 00:33:29,220 --> 00:33:29,520 Thank you. 438 00:33:29,700 --> 00:33:29,840 Thanks. 439 00:33:29,840 --> 00:33:31,180 So 440 00:33:52,560 --> 00:33:56,900 this application is for a site development plan and associated site concept plan amendment 441 00:33:56,900 --> 00:34:02,280 for building additions on the Whitfield School campus located at 175 South Mason Road. 442 00:34:04,740 --> 00:34:07,140 So here is the location of the request. 443 00:34:07,740 --> 00:34:09,880 Here is the Whitfield School campus. 444 00:34:10,700 --> 00:34:12,180 It's 23.9 acres. 445 00:34:12,440 --> 00:34:15,640 It's within our single-family residential zoning district. 446 00:34:16,320 --> 00:34:22,160 It's a conditional use in AICS 611110, elementary and secondary schools. 447 00:34:23,240 --> 00:34:28,360 The applicant has submitted an application for the site development plan for the construction of those two new additions, 448 00:34:28,580 --> 00:34:31,300 as well as an amendment to their existing site concept plan. 449 00:34:32,340 --> 00:34:38,600 And this use is allowed to continuously operate as a conditional use without a CUP from the city, 450 00:34:38,680 --> 00:34:41,540 because of the way that it was developed and incorporated into the city. 451 00:34:41,540 --> 00:34:43,700 So it was developed in St. Louis County. 452 00:34:44,380 --> 00:34:50,100 And then when it was incorporated into Creve Corps, the city accepted their approved plan from St. Louis County. 453 00:34:50,100 --> 00:34:57,120 And they've been allowed to continuously operate as a conditional use per the requirements of section 405-210A2. 454 00:35:00,960 --> 00:35:03,240 So again, here is the existing site. 455 00:35:03,360 --> 00:35:05,380 They have these practice fields and then this building. 456 00:35:06,100 --> 00:35:12,460 Currently, there is this open area in the middle that will be filled in with the library addition. 457 00:35:12,460 --> 00:35:20,880 And then the multi-purpose storm shelter addition will be right here at the rear of the building. 458 00:35:21,380 --> 00:35:24,580 And here is Ladoo and here is South Mason Road. 459 00:35:25,140 --> 00:35:29,260 And these additions will not be visible unless you're coming around the school. 460 00:35:30,280 --> 00:35:34,780 There is single family residential adjacent down here. 461 00:35:34,920 --> 00:35:39,080 And then there is this existing tree buffer that will not be touched. 462 00:35:40,960 --> 00:35:45,580 So the Whitfield School is a private school with roughly 400 students, grades 6 through 12. 463 00:35:46,180 --> 00:35:52,640 It includes a parking lot with 312 parking spaces, sports fields for soccer and baseball, 464 00:35:53,200 --> 00:35:57,240 and it was incorporated into Creek Corps in 1995 after being developed in St. Louis County. 465 00:35:58,800 --> 00:36:02,780 So here is a site development plan with those two new additions that you can see. 466 00:36:04,700 --> 00:36:09,120 This one here for the library infill is 3,650 square feet, 467 00:36:09,120 --> 00:36:16,300 And this larger one here for the storm shelter slash multi-purpose is 7,250 square feet. 468 00:36:17,680 --> 00:36:22,320 There is also a new fire access drive installed to replace the old one, 469 00:36:22,420 --> 00:36:25,580 which was in the location where the larger addition is going to be. 470 00:36:25,760 --> 00:36:28,500 And so they have had that approved by the fire district. 471 00:36:29,000 --> 00:36:32,440 They've reviewed it to make sure that their trucks can get back here 472 00:36:32,440 --> 00:36:35,140 and there's a turnaround also being installed here for the trucks. 473 00:36:36,580 --> 00:36:38,360 There's no changes to the parking lot. 474 00:36:38,360 --> 00:36:41,780 There's no additional classroom space, which is what parking is based on, 475 00:36:41,900 --> 00:36:46,820 classroom space and students, and this project is not in proposing to increase 476 00:36:46,820 --> 00:36:48,620 classroom space or students. 477 00:36:49,680 --> 00:36:51,520 And there's no new site lighting. 478 00:36:51,720 --> 00:36:54,900 There is lighting on the building, and that lighting is compliant with our 479 00:36:54,900 --> 00:36:58,700 requirements for downcast and shielded and no more than 3,000 degrees 480 00:36:58,700 --> 00:36:59,060 Kelvin. 481 00:37:00,100 --> 00:37:06,980 And the site coverage is proposed at 33%, and conditional uses like this 482 00:37:06,980 --> 00:37:10,120 This one are allowed up to 50% site coverage, so they're under that. 483 00:37:11,900 --> 00:37:14,600 Again, here are the proposed elevations. 484 00:37:14,780 --> 00:37:17,140 This portion is not visible because it's interior. 485 00:37:17,960 --> 00:37:22,400 So these are the elevations for the portions of the larger addition that is visible. 486 00:37:23,120 --> 00:37:27,480 And again, as the applicant explained, they are matching the existing building, which 487 00:37:27,480 --> 00:37:31,960 does include BRIC, CMU, and EFIS, and so that's why those materials are being 488 00:37:31,960 --> 00:37:38,160 continued on the addition to match the not only the materials in color but also the style of the 489 00:37:38,160 --> 00:37:43,720 existing building. So this is the existing building here and then this is the addition if you're 490 00:37:43,720 --> 00:37:51,000 looking like right here and then this is from the rear or I have that confused this is from 491 00:37:51,000 --> 00:37:52,180 the side this is from the rear. 492 00:37:56,870 --> 00:38:00,650 So again just those materials that they are proposing match 493 00:38:00,650 --> 00:38:01,450 the existing building. 494 00:38:03,530 --> 00:38:09,470 And the additions do not project beyond the building because they won't be visible on 495 00:38:09,470 --> 00:38:10,250 either side of the building. 496 00:38:13,130 --> 00:38:21,750 So they are proposing six new landscaping trees along the fire access road to ginkgo 497 00:38:21,750 --> 00:38:25,890 trees and form maple trees, which will be installed here between the fire access road 498 00:38:25,890 --> 00:38:27,490 and the existing soccer field. 499 00:38:28,770 --> 00:38:33,190 Staff does not believe any further landscaping is necessary given the distance from the property lines. 500 00:38:34,450 --> 00:38:38,450 And irrigation is not required as part of this project per section 405-540. 501 00:38:40,840 --> 00:38:46,580 So conditions of approval include that all new exterior lighting shall not exceed 3,000 degrees Kelvin 502 00:38:46,580 --> 00:38:53,900 and that any ground or roof mounted mechanical equipment installed be properly screened with materials approved by staff. 503 00:38:55,040 --> 00:38:55,740 Any questions? 504 00:38:57,940 --> 00:38:58,080 Yes. 505 00:38:58,860 --> 00:39:03,680 The water, the tension, and all of that is part of the site development plan? 506 00:39:04,340 --> 00:39:06,820 Correct. It is part of the site development plan. 507 00:39:06,980 --> 00:39:11,560 And what was submitted had been reviewed by our public works department, and they didn't have any comments. 508 00:39:12,400 --> 00:39:19,600 The information that she mentioned about the comments that they've received from MSD, we haven't received that information yet, 509 00:39:19,780 --> 00:39:22,500 but that will also be reviewed at the permit stage. 510 00:39:22,680 --> 00:39:25,340 And they'll have to meet MSD requirements as well as city requirements. 511 00:39:25,340 --> 00:39:29,520 So that would be in the permit and not a condition of this? 512 00:39:29,600 --> 00:39:31,200 Correct. It would be in the permit stage. 513 00:39:34,360 --> 00:39:38,240 Is HVAC for the new building? Is that moderate on the roof? 514 00:39:38,700 --> 00:39:42,800 It's not shown on the plans. That's why we added the condition that all, 515 00:39:43,140 --> 00:39:46,240 whether it's on the ground or the roof, that it has to be screened with appropriate materials. 516 00:39:46,480 --> 00:39:46,660 Okay. 517 00:39:46,980 --> 00:39:50,280 And we'll check that again at the permit stage. 518 00:39:53,860 --> 00:39:58,140 Wait, wait, wait. It's not timing up. Sorry. Thank you. 519 00:40:01,970 --> 00:40:02,930 Anyone else have any questions? 520 00:40:08,280 --> 00:40:09,480 Thank you, Bethany. 521 00:40:09,660 --> 00:40:09,900 Thank you. 522 00:40:11,060 --> 00:40:16,360 Okay, now I will open it up if anyone from the public would like to come forward and ask any questions. 523 00:40:16,540 --> 00:40:17,780 And if you could please state your name. 524 00:40:18,960 --> 00:40:26,120 Yeah, my name is Fred Brooks. I own property directly to the south of the school in the Creek subdivision. 525 00:40:27,280 --> 00:40:32,700 And I'm here to ask some questions related to noise and light pollution. 526 00:40:32,920 --> 00:40:35,560 Now, I think my light pollution questions have been addressed. 527 00:40:35,820 --> 00:40:42,220 It sounds like they're going to be using downward-focused light fixtures, though. 528 00:40:43,040 --> 00:40:47,840 It should be noted that the properties to the south of the school are at a much lower elevation, 529 00:40:47,860 --> 00:40:53,080 so even though the light fixtures may be hooded and pointed down, it's still coming right at us 530 00:40:53,080 --> 00:40:58,640 because we're at a lower elevation, but it's definitely better than the existing floodlights 531 00:40:58,640 --> 00:41:05,300 on the south side of the building, which is just your industrial style, super bright light, 532 00:41:05,420 --> 00:41:06,260 everything up like the sun. 533 00:41:07,360 --> 00:41:09,940 So that's great, but I am a bit concerned about noise pollution. 534 00:41:11,200 --> 00:41:15,620 On the plan, it did show that the heating and cooling units are going to be located 535 00:41:15,620 --> 00:41:17,100 on the reef of the storm shelter. 536 00:41:18,920 --> 00:41:22,760 and it looks like they extend above the parapet height. 537 00:41:24,160 --> 00:41:32,140 So I'd be concerned that there's going to be noise from a very high elevation broadcasting south 538 00:41:33,060 --> 00:41:39,860 and also the existing gymnasium wall extends above the storm shelter. 539 00:41:39,980 --> 00:41:46,040 So that will provide another reflective surface that takes the noise that would normally be going towards Boudu Road 540 00:41:46,040 --> 00:41:55,140 and send it back south. Also the construction of the storm shelter will put 541 00:41:55,140 --> 00:42:00,680 a large brick very acoustically reflective surface that much closer to 542 00:42:00,680 --> 00:42:05,560 the people that live south of the school. There's a lot of mention made of 543 00:42:05,560 --> 00:42:10,300 matching the brick color. I'd actually be more interested in them being 544 00:42:10,300 --> 00:42:14,100 innovative and using some kind of acoustic treatment on that large brick 545 00:42:14,100 --> 00:42:20,040 wall. And I'm also concerned that on the plan that it looks like there's a new retaining wall, 546 00:42:21,280 --> 00:42:25,660 I couldn't quite tell how high it is. With that's another reflective surface, 547 00:42:26,120 --> 00:42:30,940 the sound bounces off of inches heads south. Of course, to live next to a school 548 00:42:30,940 --> 00:42:36,000 is kind of a noisy proposition anyway. But when you have these large brick surfaces or stone 549 00:42:36,000 --> 00:42:42,460 surfaces, it just makes it worse. So I'm not saying that I'm against the addition of the 550 00:42:42,460 --> 00:42:49,960 or the plans. But I would like to see some consideration made for addressing some of the noise perhaps either with acoustic treatment. 551 00:42:51,780 --> 00:42:54,940 There was mention of screening around the heating and cooling units. 552 00:42:55,980 --> 00:42:58,540 Visual screening often doesn't do anything about the noise. 553 00:42:59,480 --> 00:43:08,600 So I would hope that that screening material would be appropriate to direct the noise up and not allow it to radiate back towards the residences. 554 00:43:09,840 --> 00:43:10,900 So those are my concerns. 555 00:43:11,180 --> 00:43:12,300 Great. Thank you very much. 556 00:43:16,530 --> 00:43:19,870 Would you want to adjust the screening or should I have... 557 00:43:19,870 --> 00:43:21,750 Do you want to come up again? 558 00:43:27,230 --> 00:43:29,730 So there are three HVAC units on the roof. 559 00:43:30,090 --> 00:43:31,630 One is existing. It's currently on the ground 560 00:43:31,630 --> 00:43:34,130 and we're lifting it up and putting it on the storm shelter roof. 561 00:43:34,670 --> 00:43:37,590 And the other two are in between 562 00:43:37,590 --> 00:43:40,430 essentially that existing building in the end of the storm shelter. 563 00:43:40,590 --> 00:43:42,710 So they're kind of internal to the site itself, 564 00:43:43,510 --> 00:43:45,530 but we'll absolutely be providing screening 565 00:43:45,530 --> 00:43:48,030 on the roof for those. 566 00:43:51,120 --> 00:43:53,420 It'll be visually screened. It does extend over the 567 00:43:53,420 --> 00:43:58,860 parapet. Yeah, we're happy to make any any considerations. We need to for sound as 568 00:43:58,860 --> 00:44:00,820 well. Okay, I think that might be good too. 569 00:44:00,820 --> 00:44:00,900 Okay. 570 00:44:02,280 --> 00:44:02,680 Yeah. 571 00:44:02,900 --> 00:44:03,420 I'll do that. 572 00:44:04,140 --> 00:44:06,900 If they're visiting their analogues, they're going to rune. 573 00:44:08,140 --> 00:44:10,020 I don't know what I'm saying, but like so, you know. 574 00:44:10,560 --> 00:44:10,960 Okay. 575 00:44:13,660 --> 00:44:15,780 So, if you're free, you know. 576 00:44:18,780 --> 00:44:19,180 Okay. 577 00:44:19,800 --> 00:44:20,100 What's that? 578 00:44:21,380 --> 00:44:25,360 Would you like to speak to that if we wanted to add a condition for the sound as well, 579 00:44:25,400 --> 00:44:25,600 or? 580 00:44:29,480 --> 00:44:31,900 A little difficult to arch it. 581 00:44:31,900 --> 00:44:35,120 This would meet our ordinance requirements for screening. 582 00:44:35,720 --> 00:44:39,180 We don't require sound studies for rooftop mechanical screening. 583 00:44:39,360 --> 00:44:43,900 I think this is a 300, it's 300 feet away from a property line. 584 00:44:44,140 --> 00:44:46,860 So it's not something that drew our concern. 585 00:44:47,480 --> 00:44:50,680 And our ordinance does require them to be screened from view, 586 00:44:50,780 --> 00:44:52,700 and it sounds like the appnet is going to screening. 587 00:44:53,620 --> 00:44:56,580 I suppose we could take a look at some acoustical treatment 588 00:44:56,580 --> 00:44:59,960 of the panels when we review and discuss it further with the 589 00:45:01,940 --> 00:45:05,620 It's a little outside of the bounds of what we normally do for this type of application. 590 00:45:06,120 --> 00:45:22,240 Is there a sound limitation? Let's say it was making a big bracket. Could there be later on a sound study and if it was violating an ordinance of some kind, then they would have to do something about it? 591 00:45:22,400 --> 00:45:27,360 That is correct. The city utilizes St. Louis County's noise ordinance. 592 00:45:27,360 --> 00:45:35,420 So our ordinance says any type of sound transmission must not violate St. Louis County's noise 593 00:45:35,420 --> 00:45:40,580 ordinance requirements. So we actually defer to the county standards in our ordinance. So if there 594 00:45:40,580 --> 00:45:45,580 are any noise concerns, those would be reported to St. Louis County and St. Louis County actually 595 00:45:45,580 --> 00:45:50,680 administers that ordinance. It falls under the umbrella of the County Health Department. 596 00:45:51,180 --> 00:45:56,720 So noise issues is a countywide health concern. So yes, and there are standards and 597 00:45:56,720 --> 00:46:01,860 And they're basically, they're made at the property line and they're based upon the land 598 00:46:01,860 --> 00:46:02,160 uses. 599 00:46:02,980 --> 00:46:05,500 And it also involves duration of a noise. 600 00:46:05,900 --> 00:46:07,840 So there's a lot that goes into that. 601 00:46:08,140 --> 00:46:11,640 But if there are concerns about noise, I think we can work with the applicant to take a 602 00:46:11,640 --> 00:46:15,700 look at that and then see if there's any treatment that we may need within reason. 603 00:46:15,960 --> 00:46:21,060 But ultimately, I think to your point, there is that other avenue that the county 604 00:46:21,060 --> 00:46:23,860 health department can't get involved if there are noise complaints. 605 00:46:32,660 --> 00:46:35,020 Anyone else would like to come forward and speak? 606 00:46:39,020 --> 00:46:39,560 One question. 607 00:46:40,080 --> 00:46:40,480 Yes, sir. 608 00:46:41,480 --> 00:46:52,700 Did I hear, you were talking about the one resident who was speaking about issues, that there's 609 00:46:52,700 --> 00:46:56,320 some old-style lighting that reflects on your subdivision? 610 00:46:57,200 --> 00:46:58,340 Did I hear something like that? 611 00:46:58,720 --> 00:46:59,060 Sure. 612 00:46:59,800 --> 00:47:00,900 Could you come up? 613 00:47:02,240 --> 00:47:04,820 Thank you. 614 00:47:04,820 --> 00:47:14,160 There's at least one very bright floodlight mounted fairly high on the existing gymnasium wall that shines backwards to the south. 615 00:47:14,660 --> 00:47:23,200 If that's going to be eliminated and replaced with the downward-facing lights that are lower on the building, that's great. 616 00:47:23,500 --> 00:47:26,080 I mean, that goes a long way towards reducing the light pollution. 617 00:47:26,660 --> 00:47:32,160 I think all buildings should try to reduce light pollution. 618 00:47:32,160 --> 00:47:33,400 There are standards. 619 00:47:34,160 --> 00:47:35,620 There's an organization called the Dark Sky. 620 00:47:36,100 --> 00:47:41,140 They certify lighting from different manufacturers as to whether they're friendly towards 621 00:47:42,000 --> 00:47:45,500 looked-at-fars or towards the actatory birds and other wildlife stuff. 622 00:47:46,180 --> 00:47:52,080 So I think my light pollution concerns will be mitigated. 623 00:47:53,780 --> 00:47:55,480 Yeah, they're shaking their heads, yes. 624 00:47:55,840 --> 00:47:56,020 Yes. 625 00:47:56,020 --> 00:48:05,520 That's just the creation of a new reflecting sound surface and taking the existing giant 626 00:48:05,520 --> 00:48:10,200 frick facade of the gymnasium and pushing it closer to my property. 627 00:48:11,700 --> 00:48:13,820 I don't know if there's an easy solution for that. 628 00:48:14,660 --> 00:48:18,260 Certainly a flat brick wall sound bounces off of it. 629 00:48:21,120 --> 00:48:22,700 Maybe not a lot you can do with that. 630 00:48:22,700 --> 00:48:26,300 I mean, there are treatments that can be applied to the exterior of buildings that probably 631 00:48:26,300 --> 00:48:31,180 adds cost, probably the easiest thing to be for the shrouding of the heating and cooling 632 00:48:31,180 --> 00:48:37,700 equipment to choose something that's not just a vinyl visual shield, but something 633 00:48:37,700 --> 00:48:40,580 that has heft to it to block the sound transmission. 634 00:48:41,400 --> 00:48:47,260 So I think that's certainly within the realm of possibility and not excessively 635 00:48:47,260 --> 00:48:47,580 expensive. 636 00:48:48,140 --> 00:48:49,240 Thank you. 637 00:48:49,240 --> 00:48:49,900 Thank you. 638 00:48:56,740 --> 00:49:02,220 I move to recommend approval to amend the existing site concept plan for the Whitfield 639 00:49:02,220 --> 00:49:08,720 School and approve the site development plan for the two new additions to the building as 640 00:49:08,720 --> 00:49:15,520 bound together with application number 25-037 presented to the Planning and Zoning Commission 641 00:49:15,520 --> 00:49:19,840 subject to the conditions outlined in the staff report for the meeting of December 642 00:49:19,840 --> 00:49:21,200 15, 2025. 643 00:49:23,500 --> 00:49:24,120 Second. 644 00:49:24,620 --> 00:49:24,980 Thank you. 645 00:49:25,460 --> 00:49:26,420 Mr. Bielter. 646 00:49:26,820 --> 00:49:27,240 Aye. 647 00:49:27,720 --> 00:49:28,280 Ms. O'Brien. 648 00:49:28,920 --> 00:49:29,160 Aye. 649 00:49:29,300 --> 00:49:30,080 Mr. Potashnik. 650 00:49:30,180 --> 00:49:30,320 Aye. 651 00:49:30,500 --> 00:49:31,060 Ms. Richter. 652 00:49:31,360 --> 00:49:31,560 Aye. 653 00:49:31,740 --> 00:49:32,500 Mr. Tomlinson. 654 00:49:33,000 --> 00:49:33,180 Aye. 655 00:49:33,300 --> 00:49:33,840 Mr. Wang. 656 00:49:34,000 --> 00:49:34,160 Aye. 657 00:49:34,320 --> 00:49:34,960 And I vote aye. 658 00:49:38,980 --> 00:49:39,440 Thank you. 659 00:49:42,880 --> 00:49:48,780 Next on the agenda is public hearing 25028 and 25039. 660 00:49:49,800 --> 00:49:56,260 Applications for a site development plan and preliminary plan on lot 16 for a 67-unit 661 00:49:56,260 --> 00:50:01,700 townhome development, along with an amendment to the Olia village plan makes use zoning district 662 00:50:01,700 --> 00:50:07,540 site concept plan and development regulations for the property at 10300 all of Boulevard. 663 00:50:08,160 --> 00:50:11,480 If anyone speaking, could please come forward to be sworn in. 664 00:50:20,960 --> 00:50:21,600 Good 665 00:50:27,080 --> 00:50:31,200 evening. My name is Rob Hayes. I'm a planning and entitlements manager for 666 00:50:32,480 --> 00:50:38,280 My address is 3940 Olympic Boulevard Suite 400, Erlinger, Kentucky, 41018. 667 00:50:38,760 --> 00:50:43,420 Thank you for your consideration and your time this evening. 668 00:50:46,160 --> 00:50:47,500 As I said, I'm Rob Hayes. 669 00:50:47,560 --> 00:50:49,760 I'm the planning and entitlements manager for Grand Communities. 670 00:50:49,960 --> 00:50:52,480 We are the land development company for Fisher Homes. 671 00:50:53,860 --> 00:50:56,400 This evening, we'll walk through a little bit about Fisher Homes, 672 00:50:57,040 --> 00:51:01,740 then talk about our proposal for Lot 16 of the Olia Village development, 673 00:51:01,740 --> 00:51:07,340 And then we're available also for questions, any questions that you might have this evening. 674 00:51:07,680 --> 00:51:12,520 I am joined this evening by our consulting engineer, Ms. Kate Stockito of Stock and Associates. 675 00:51:14,160 --> 00:51:19,000 So a little bit about Fisher Homes. Fisher Homes is a privately owned home builder. 676 00:51:19,240 --> 00:51:24,680 We are based in suburban Cincinnati. We were founded in 1980 by Henry and Elaine Fisher. 677 00:51:25,260 --> 00:51:31,680 We are one of the, we are in the top 35 largest home builders in the country. 678 00:51:31,840 --> 00:51:34,000 We are primarily a regional home builder. 679 00:51:34,400 --> 00:51:37,460 We are in nine different markets in seven states. 680 00:51:37,820 --> 00:51:40,420 We're very proud of our high customer satisfaction ratings. 681 00:51:43,170 --> 00:51:46,050 Additionally, Fisher Homes prides itself on giving back to the community. 682 00:51:46,290 --> 00:51:48,150 We're a big supporter of the St. Jude program. 683 00:51:48,150 --> 00:52:00,770 Also, we donate or we make in-kind donations to museums, ballparks, and other public areas within communities, within each of our divisions. 684 00:52:02,430 --> 00:52:05,810 So we did expand into the St. Louis market in 2021. 685 00:52:06,510 --> 00:52:10,070 We are currently building in a number of communities in the St. Louis area. 686 00:52:10,070 --> 00:52:15,050 Grand Communities is developing the Gateway Heights project in Richmond Heights, 687 00:52:15,590 --> 00:52:18,350 which has the product that we'll be talking about tonight, or pardon me, 688 00:52:18,430 --> 00:52:20,650 the predecessors to the products we'll be talking about tonight. 689 00:52:21,270 --> 00:52:24,830 And then also, Deer Hollow is currently, development is finishing up 690 00:52:24,830 --> 00:52:27,650 and vertical construction is starting to begin in town and country 691 00:52:27,650 --> 00:52:28,890 directly adjacent to Creek Corps. 692 00:52:31,960 --> 00:52:36,400 So, again, we're talking about the Olia Village property, Lot 16. 693 00:52:39,950 --> 00:52:43,550 On Lot 16, there are several notable site constraints 694 00:52:43,550 --> 00:52:46,190 that influence the design of this project. 695 00:52:46,770 --> 00:52:50,170 Specifically, the site has a significant amount of topography. 696 00:52:50,570 --> 00:52:55,730 It's 70 feet from the eastern part of the site at the former Bayer Drive, 697 00:52:55,810 --> 00:52:58,350 now Olio Drive ramps off of Lindberg Boulevard, 698 00:52:58,590 --> 00:53:01,330 down to the stream that runs through the site. 699 00:53:01,410 --> 00:53:02,430 There's also a stream buffer. 700 00:53:02,970 --> 00:53:07,130 And then on that eastern side there is the public primuse easement as well. 701 00:53:10,490 --> 00:53:12,330 This is a rendering of our proposed plan. 702 00:53:12,330 --> 00:53:16,250 There are two products that are offered that are being proposed for this site. 703 00:53:16,650 --> 00:53:22,470 At the northwest side of the rendering that you see, we have our rear entry products. 704 00:53:22,570 --> 00:53:25,710 So those products are facing and fronting on all of Cove. 705 00:53:26,370 --> 00:53:30,850 And then on the street that runs north, south, on the eastern side of the property, 706 00:53:31,490 --> 00:53:33,670 we have our front-loading product. 707 00:53:33,930 --> 00:53:35,850 So each of these products has a two car garage. 708 00:53:36,090 --> 00:53:39,930 In the products on the north, they present on all of Cove. 709 00:53:40,510 --> 00:53:44,730 without any vehicular access, whereas the products on the east side of the property 710 00:53:44,730 --> 00:53:50,110 present internally with both pedestrian and vehicular access shared internally. 711 00:53:50,690 --> 00:53:55,630 Additionally, the homes on the east side of the property are a reverse walkout condition. 712 00:53:56,150 --> 00:53:59,510 So all of these products are three stories, but the homes on the east side, 713 00:53:59,770 --> 00:54:04,510 on the eastern facade of those homes, two stories would be above grade, 714 00:54:04,550 --> 00:54:07,550 and the garage and lower level would transition. 715 00:54:07,550 --> 00:54:12,410 So one level of grade would transition between the front door and the backyard. 716 00:54:13,490 --> 00:54:21,510 Additionally, the site doesn't necessitate a retaining wall in the rear of several of the buildings between the ramps. 717 00:54:21,590 --> 00:54:25,590 And let me see if I can point this one 718 00:54:27,800 --> 00:54:28,100 up here. 719 00:54:29,360 --> 00:54:31,880 Your experience of retaining a wall on the max. 720 00:54:35,120 --> 00:54:43,940 So again, a mix of our Logan and Meridian products, 45 of the Logan products, which is that front entry, and 22 of the Meridian, which are the rear entry. 721 00:54:45,360 --> 00:54:46,420 The rear garage entry. 722 00:54:47,080 --> 00:54:48,200 This is our landscaping plan. 723 00:54:49,360 --> 00:54:52,440 We do have a significant amount of landscaping on the property. 724 00:54:52,660 --> 00:54:54,080 We have 334 trees. 725 00:54:54,080 --> 00:55:05,340 So a significant amount of landscaping, we really do pride ourselves on landscaping, helping to create a timeless community from the time that we install it as the community ages. 726 00:55:08,710 --> 00:55:13,150 Pedestrian connections, as you can see here, this is the pedestrian connection diagram through the site. 727 00:55:14,170 --> 00:55:23,150 As proposed, there is a sidewalk on the western side of the north-south street through the community, not on the eastern side. 728 00:55:23,150 --> 00:55:27,470 That was a conscious design decision that was made because of that topography, 729 00:55:27,550 --> 00:55:30,550 because of the topographic challenges that I talked about earlier. 730 00:55:31,250 --> 00:55:37,350 In order to accommodate a parked car in the driveway for guest parking that does not encroach upon the sidewalk, 731 00:55:38,650 --> 00:55:44,710 the sidewalk, the driveways have to be wide enough to have that 20 feet of car space than the sidewalk. 732 00:55:45,650 --> 00:55:53,110 because of the constraints between the creek and the public prim use easement on the east side of the property, 733 00:55:53,850 --> 00:55:59,830 it's very tight and that retaining wall, our goal is to keep that retaining wall on the east side of the property as low as possible. 734 00:56:00,590 --> 00:56:05,030 If we were to add a sidewalk on the east side of the property, that would cause that retaining wall. 735 00:56:05,190 --> 00:56:06,990 We would have to make that retaining wall taller. 736 00:56:07,550 --> 00:56:13,210 And so that was why that choice was made, why that is proposed as shown here. 737 00:56:14,450 --> 00:56:15,410 Excuse me. 738 00:56:15,710 --> 00:56:15,930 Yes, sir. 739 00:56:16,370 --> 00:56:17,150 That's a change. 740 00:56:18,990 --> 00:56:21,030 No, ma'am. 741 00:56:22,550 --> 00:56:23,890 Not from our proposal, no. 742 00:56:25,970 --> 00:56:28,610 So these are the products that have been proposed. 743 00:56:29,430 --> 00:56:32,090 These are the renderings of the products and their colors. 744 00:56:33,190 --> 00:56:37,010 And they would start at the 850s and go up from there. 745 00:56:38,010 --> 00:56:42,190 You see bedrooms and bathroom combinations can vary just based 746 00:56:42,190 --> 00:56:46,110 based on what selections a customer makes in customizing each of their individual units. 747 00:56:47,310 --> 00:56:52,450 These properties would be maintained, all exteriors would be maintained by the HOA, therefore 748 00:56:52,450 --> 00:56:55,930 landscaping on the exterior, yards in the exterior as well as the building envelope 749 00:56:55,930 --> 00:56:57,370 would be maintained by the HOA. 750 00:56:58,690 --> 00:57:04,550 Typically those would therefore attract young professionals as well as people who are 751 00:57:04,550 --> 00:57:08,070 downsizing and choosing to have a maintenance-free lifestyle. 752 00:57:09,630 --> 00:57:13,190 Again, the Meridian is at the top, and then the Logan on the bottom. 753 00:57:14,510 --> 00:57:19,130 And these are just some examples of what our interiors would like, just modern interiors as well. 754 00:57:23,860 --> 00:57:30,300 With that, I'm available for any questions that you might have as well as hate questions of either of us. 755 00:57:30,840 --> 00:57:35,140 So thank you so much, and thank you for your time. Yes, ma'am. 756 00:57:35,140 --> 00:57:41,740 I had a question. It had to do with the brick. There's something about a radius thing. I really didn't understand what that meant. 757 00:57:42,980 --> 00:57:45,140 And I apologize for not mentioning that. 758 00:57:50,320 --> 00:58:01,700 This area here, because of the mention between the site of the property and the central lines to be located here, 759 00:58:04,940 --> 00:58:10,340 In order to make this connect, we have to have the horizontal radius. 760 00:58:12,400 --> 00:58:14,140 Go ahead, Kate, if you'd like to speak a little bit more. 761 00:58:16,020 --> 00:58:18,560 Good evening. I'm Kate Stockjito with Stock & Associates. 762 00:58:18,720 --> 00:58:22,080 Our address is 257 Cheshirefield Business Parkway in Cheshirefield, Missouri. 763 00:58:22,880 --> 00:58:27,560 So what Rob is indicating, the site-specific ordinance for Olia, 764 00:58:28,100 --> 00:58:32,120 private streets require a horizontal minimum radius of 150. 765 00:58:32,120 --> 00:58:41,960 We are unable to achieve that 150 radius due to the alignment of the existing loop road, 766 00:58:42,300 --> 00:58:44,860 so only a drive, former bear drive that heads south. 767 00:58:45,200 --> 00:58:47,960 We are not able to get 150 foot radius in there. 768 00:58:48,260 --> 00:58:54,040 We are required by both city and fire to have two accesses into the site. 769 00:58:54,040 --> 00:59:08,700 In order to do that we are seeking relief to the city's code as well as the ordinance to go to an 80 instead of 150 foot horizontal radius where Rob had indicated. 770 00:59:09,060 --> 00:59:12,280 So does that just mean that the traffic will be slower going? 771 00:59:12,920 --> 00:59:23,740 Our intention with, it would be slowed down because we have incorporated a landscape island to divide north and southbound traffic. 772 00:59:24,140 --> 00:59:28,580 That was our intention, was to slow it down as you are making a little bit more of a sharp turn. 773 00:59:32,090 --> 00:59:40,450 And that all of the pedestrian walkability that was in our original plan is still maintained. 774 00:59:40,450 --> 00:59:46,490 So it's our understanding with Lot 16. It was left a little bit as a question mark. 775 00:59:46,810 --> 00:59:52,130 It wasn't quite determined who would be the end user for Lot 16. 776 00:59:52,790 --> 00:59:59,970 And part of us coming in with this particular plan, we needed to mend both the street and the pedestrian connection. 777 01:00:00,000 --> 01:00:05,280 Activity. So it wasn't defined in the overall concept plan what the pedestrian 778 01:00:05,280 --> 01:00:09,640 connectivity of lot 16 would look like relative to the overall oleothilage 779 01:00:09,640 --> 01:00:13,800 development. So what does it look like then? 780 01:00:26,880 --> 01:00:30,120 So highlighted in red would be our 781 01:00:30,120 --> 01:00:35,140 sidewalk connections. There would be private sidewalk connections to each of 782 01:00:35,140 --> 01:00:40,860 those units. But what is depicted in red is what would be the overall pedestrian 783 01:00:40,860 --> 01:00:43,180 and pay pass throughout the developments. 784 01:00:43,780 --> 01:00:51,020 If we look on the far left-hand side, over on the meridian side, there's a red sidewalk 785 01:00:51,020 --> 01:00:57,040 that would pick up that four-unit cluster, work its way northeast and then follow Olive 786 01:00:57,040 --> 01:00:59,980 Cove as you continue to work your way northeast. 787 01:01:00,360 --> 01:01:02,180 It would then turn south into the site. 788 01:01:02,460 --> 01:01:09,440 There would be a crosswalk to then get you to the south side of the western internal 789 01:01:09,440 --> 01:01:15,840 And that red sidewalk would follow behind four parallel parking stalls. 790 01:01:16,220 --> 01:01:23,620 As you work your way south and east towards the Logan product, there would be a mail kiosk there. 791 01:01:23,800 --> 01:01:27,240 So there's additional parallel parking spaces for that. 792 01:01:27,680 --> 01:01:32,000 The sidewalk would continue south to pick up the remaining Logan products. 793 01:01:32,480 --> 01:01:38,920 As you get to the southernmost point, we would have another crosswalk that takes you through that landscape island, 794 01:01:38,920 --> 01:01:46,160 And continuing east, you would then tie into the overall Olio village sidewalk on that 795 01:01:46,160 --> 01:01:46,520 side. 796 01:01:46,900 --> 01:01:53,940 There's also a crosswalk that would be proposed at our proposed northern access into the site 797 01:01:53,940 --> 01:02:01,400 at Olive Cove, which would then put you on the eight-foot wide multi-use trail as 798 01:02:01,400 --> 01:02:07,120 defined by the overall pedestrian plan of the Olio village development. 799 01:02:08,720 --> 01:02:16,560 And so those walkable red lines, are all of that, is that all private or let's just say 800 01:02:16,560 --> 01:02:19,900 a person's walking the dog, but they walk their dog on there? 801 01:02:20,300 --> 01:02:25,820 It is intended to be private. Rob, do you want to speak too? 802 01:02:25,820 --> 01:02:32,890 Privates as private for the residents of the family. 803 01:02:33,390 --> 01:02:37,130 So that would be gated and would not be not gated. 804 01:02:39,130 --> 01:02:44,430 So the sidewalk that's along Olive Cove that is public that would be in an easement. 805 01:02:44,590 --> 01:02:50,290 There's an existing easement there today but internal to lot 16 that is private intended to be private. 806 01:02:50,290 --> 01:02:53,350 Can you just use your subrediction? 807 01:02:59,280 --> 01:02:59,900 We got it. 808 01:02:59,900 --> 01:03:00,200 Okay. 809 01:03:00,600 --> 01:03:03,020 So this one wrong here is public, 810 01:03:05,270 --> 01:03:07,770 private, private. 811 01:03:12,290 --> 01:03:15,590 And then it would tie in to the public sidewalk. 812 01:03:16,210 --> 01:03:20,490 Here, there's also a trailhead in this location that could take 813 01:03:20,490 --> 01:03:24,490 residence to other areas within the Olio development. 814 01:03:25,730 --> 01:03:29,090 So is there a sidewalk then that goes up? 815 01:03:30,450 --> 01:03:31,050 Yes. 816 01:03:31,210 --> 01:03:31,630 Yeah, there. 817 01:03:32,010 --> 01:03:32,370 Yes. 818 01:03:32,590 --> 01:03:33,830 So it's tying into that. 819 01:03:34,090 --> 01:03:41,190 So with the six-foot sidewalk, that transitions to an eight at this intersection here. 820 01:03:41,510 --> 01:03:44,450 And then it is an eight all the way up to here. 821 01:03:45,530 --> 01:03:47,030 And then there's a crosswalk. 822 01:03:47,610 --> 01:03:54,750 And then the eight-foot wide multi-use sidewalk then comes and wraps back around. 823 01:03:55,090 --> 01:03:55,350 Okay. 824 01:03:55,830 --> 01:03:56,150 Thank you. 825 01:04:01,280 --> 01:04:02,220 Other questions? 826 01:04:03,740 --> 01:04:04,180 Okay. 827 01:04:04,920 --> 01:04:06,020 Recap the price points. 828 01:04:07,660 --> 01:04:09,940 They would be starting in the eight fifties. 829 01:04:10,340 --> 01:04:11,220 Yes, sir. 830 01:04:11,520 --> 01:04:19,640 And how much of an exercise would it be to put sidewalks on both sides of the street? 831 01:04:20,880 --> 01:04:28,040 So the reason that we did not include that was to minimize the height of the retaining 832 01:04:28,040 --> 01:04:29,280 walls and the east side of the property. 833 01:04:29,280 --> 01:04:31,940 And how much does that change the height of the team? 834 01:04:32,980 --> 01:04:37,860 So where it becomes a problem, we would need to make sure that we were able to construct 835 01:04:37,860 --> 01:04:43,520 six-foot walk and then park, be able to park a vehicle and not overhang that sidewalk. 836 01:04:44,020 --> 01:04:46,780 So we would be moving everything to the east. 837 01:04:47,660 --> 01:04:48,940 Grading would be updated. 838 01:04:49,880 --> 01:04:56,000 We would also need to make sure we're maintaining drainage whales to meet MSC requirements 839 01:04:56,000 --> 01:04:59,080 for 100-year overland flow path and thus the walls will get taller. 840 01:04:59,740 --> 01:05:04,300 We are limited with where we can place the walls because there's an existing 15-foot-wide 841 01:05:05,120 --> 01:05:11,720 public premium season that is a permanent roadway improvement, sidewalk utility type 842 01:05:11,720 --> 01:05:15,140 easement lasts forever dedicated to the city. 843 01:05:15,720 --> 01:05:20,600 As we increase the height of the wall, the length of the tie-backs, the structural 844 01:05:20,600 --> 01:05:24,100 support would then start to encroach into the city's easement. 845 01:05:24,100 --> 01:05:29,160 So we are limited with where we can place this wall, maintain a drainage easement, 846 01:05:29,600 --> 01:05:31,420 not encroach into the city's easement. 847 01:05:32,800 --> 01:05:34,280 I'd like to repeat what you said. 848 01:05:34,820 --> 01:05:35,060 Pardon? 849 01:05:36,680 --> 01:05:38,360 I didn't get that, of course. 850 01:05:38,600 --> 01:05:39,120 Oh, I'm okay. 851 01:05:40,760 --> 01:05:42,960 So how much would you have to raise the wall? 852 01:05:44,540 --> 01:05:45,680 I don't want to just spit out anything. 853 01:05:46,680 --> 01:05:46,920 Pardon? 854 01:05:47,260 --> 01:05:48,080 Give it to me in fees. 855 01:05:48,160 --> 01:05:50,740 So right now the wall is 10 foot tall, max. 856 01:05:50,740 --> 01:05:56,000 And as Rob mentioned, this product is their reverse walkout on the east side. 857 01:05:56,760 --> 01:06:00,320 So where it is adjacent to the wall, that's floor two. 858 01:06:00,680 --> 01:06:02,860 On the street side, it's floor one. 859 01:06:03,600 --> 01:06:12,460 So you're already two stories above the two stories, that's correct, on the far east side. 860 01:06:12,460 --> 01:06:24,280 And the taller you make the wall, the more difficult it becomes to sell those units because your view then becomes a very, very tall retaining wall. 861 01:06:24,620 --> 01:06:29,860 I don't want to spit out a number as to how much taller the wall is going to be, but right now it's 10 feet tall. 862 01:06:30,380 --> 01:06:39,880 All right, but I'd like to just add two or three feet to the height of the wall. 863 01:06:41,060 --> 01:06:43,780 Two to three weeks. 20 to 30 percent. 864 01:06:44,800 --> 01:06:45,100 Correct. 865 01:06:47,980 --> 01:06:54,460 And why wouldn't we want there to be a sidewalk on both sides of the street? 866 01:06:55,380 --> 01:06:58,020 I'm sort of asking that as a question. 867 01:06:58,800 --> 01:07:03,060 Well, I guess I'm trying to note it because there is a sidewalk there. 868 01:07:03,320 --> 01:07:06,240 It's just the only a village sidewalk, correct? 869 01:07:08,660 --> 01:07:10,020 Like in front of the other units. 870 01:07:11,360 --> 01:07:14,000 So, this would be the, does that work here? 871 01:07:14,220 --> 01:07:14,440 Yes. 872 01:07:14,660 --> 01:07:15,820 There is a sidewalk here, yes. 873 01:07:16,120 --> 01:07:18,240 These are the, this would be the rear of these units. 874 01:07:18,680 --> 01:07:20,060 And these units would sit. 875 01:07:20,840 --> 01:07:21,820 But we didn't have that sidewalk. 876 01:07:24,440 --> 01:07:26,560 So there's just the red sidewalk. 877 01:07:26,660 --> 01:07:27,480 So you can see it. 878 01:07:27,640 --> 01:07:30,280 It's on the left side from here. 879 01:07:31,000 --> 01:07:34,880 And then, but then there's an inside walk on the other side. 880 01:07:34,940 --> 01:07:37,980 But there is the oleodilic sidewalk on the other side of their home. 881 01:07:38,600 --> 01:07:40,400 The sidewalk here is not a sidewalk. 882 01:07:43,600 --> 01:07:47,540 And what to do if we – I asked them to go online. 883 01:07:48,020 --> 01:07:51,560 How many feet of sidewalk would you have if you could have both sides of the screen? 884 01:07:56,380 --> 01:07:57,020 Just guess. 885 01:07:57,980 --> 01:07:58,520 Just guess. 886 01:08:01,000 --> 01:08:01,520 How 887 01:08:04,500 --> 01:08:05,440 wide are the lots? 888 01:08:07,400 --> 01:08:08,640 Those are 24. 889 01:08:08,860 --> 01:08:10,420 The ends are 34. 890 01:08:10,620 --> 01:08:18,460 So you're probably 300 feet at that southern point where the road starts to then bend 891 01:08:18,460 --> 01:08:21,980 and the alignment of the homes kind of kink. 892 01:08:30,260 --> 01:08:31,840 Well, I'd like some help here. 893 01:08:32,180 --> 01:08:35,000 Yeah, I think we need another picture maybe of it. 894 01:08:35,980 --> 01:08:37,820 Maybe, Jay, you could edit for a while, 895 01:08:37,980 --> 01:08:41,520 but why wouldn't we want to have sidewalks on both sides of the street? 896 01:08:42,420 --> 01:08:45,460 I can cover that during my remarks whenever you're ready for that. 897 01:08:45,940 --> 01:08:47,020 I have some comments. 898 01:08:50,940 --> 01:08:51,800 Other questions? 899 01:08:53,600 --> 01:08:54,080 Okay. 900 01:08:54,240 --> 01:08:54,580 Thank you. 901 01:08:54,800 --> 01:08:56,420 Thank you. 902 01:09:13,680 --> 01:09:14,360 Good evening. 903 01:09:14,620 --> 01:09:17,300 Jason Jagge, director of community development with the CFP4. 904 01:09:17,700 --> 01:09:20,280 Let's give Bethany a second to load up that presentation. 905 01:09:28,120 --> 01:09:28,440 Thank you. 906 01:09:29,140 --> 01:09:29,380 Okay. 907 01:09:29,500 --> 01:09:35,620 So as discussed, this application is for the development of lot 16 and it involves 908 01:09:35,620 --> 01:09:37,380 a few technical requests. 909 01:09:37,860 --> 01:09:40,500 But so the first thing is a site development plan. 910 01:09:40,660 --> 01:09:44,240 That's the instrument that approves the site layout, number of units, landscaping, 911 01:09:44,780 --> 01:09:49,320 architectural appearance of the buildings, pedestrian access, all of that. 912 01:09:49,720 --> 01:09:54,380 Then we also have the preliminary plot, which takes Lot 16, which has already been created 913 01:09:54,380 --> 01:09:59,440 within the Olio Village original Southern Platt, and it divides it into the 67 914 01:09:59,440 --> 01:10:04,320 individually owned lots for the townhomes as well as establishes common ground 915 01:10:04,320 --> 01:10:06,280 and the streets that are proposed to be private. 916 01:10:06,900 --> 01:10:10,380 And then we have the amendments to the site concept plan and the development 917 01:10:10,380 --> 01:10:14,600 standards as they apply to all of the Olio Village Plan District. 918 01:10:14,880 --> 01:10:20,480 So I want to make clear this is the mix involved with the request tonight. 919 01:10:21,800 --> 01:10:27,300 So that is, again, Site Development Plan 67, attached single-family townhouses on Lot 16. 920 01:10:27,600 --> 01:10:30,920 These would be four sale units on individually-owned lots. 921 01:10:32,320 --> 01:10:37,700 Primary plan for the residential component, like I said, the amendments to the overall site concept plan for Olio, 922 01:10:37,700 --> 01:10:42,220 as well as the development center's amendments for that roadway geometry that was mentioned there. 923 01:10:42,960 --> 01:10:49,460 So this, just taking you back in time, two years is when this plan was approved for Olia Village. 924 01:10:50,700 --> 01:10:56,560 And a few months ago, we were looking at Lot 1, which was a grocery store and retail building. 925 01:10:56,740 --> 01:11:00,980 That was approved by P&Z and City Council, and now we're looking at Lot 16. 926 01:11:01,220 --> 01:11:05,500 So this is the site within the Olia Village development. 927 01:11:05,500 --> 01:11:10,420 And it was talked about earlier that this area was sort of set aside and I would agree with that. 928 01:11:10,540 --> 01:11:14,640 You can see here this nothing was depicted in terms of the street layout. 929 01:11:14,840 --> 01:11:18,760 This is a concept but a very rough illustrative concept. 930 01:11:19,180 --> 01:11:24,580 This was not an engineered concept and it actually allowed up to 130 townhomes. 931 01:11:24,820 --> 01:11:27,780 But when the engineering has been done for this application, 932 01:11:27,780 --> 01:11:33,720 you really can't fit that many on here to account for stormwater and all the other challenges that I think you've heard tonight. 933 01:11:33,720 --> 01:11:40,400 So the proposal is to actually reduce that quite a bit lower than what was authorized by the Olia Village Ordnance. 934 01:11:41,600 --> 01:11:43,540 So this is what we're asking for. 935 01:11:43,680 --> 01:11:44,980 This is the approved council plan. 936 01:11:45,400 --> 01:11:50,340 This would be updated to implement all of the approved changes for the goal. 937 01:11:51,580 --> 01:11:54,040 So again, that's the ordinance number. 938 01:11:54,160 --> 01:11:55,980 That was November of 2023. 939 01:11:55,980 --> 01:12:02,100 Lot 16 was identified as that subcategory D, which does call for residential development, 940 01:12:02,580 --> 01:12:06,540 which can authorize up to 130 single-family units or attached towns. 941 01:12:07,200 --> 01:12:10,480 So this project is being referred to as the Vale at Olio Village. 942 01:12:11,080 --> 01:12:19,580 Lot 16, you can see it's 11.16 acres in size, out of the total almost 96 acres within 943 01:12:19,580 --> 01:12:23,020 Olio Village Development, 67 owner-occupied units. 944 01:12:23,020 --> 01:12:27,400 They will have been clusters of two to six attached townhomes throughout the site here. 945 01:12:28,280 --> 01:12:32,160 13 buildings, three stories in height, and like I said, they're attached units. 946 01:12:32,740 --> 01:12:37,820 There are two different model types or formats, if you will, being proposed. 947 01:12:38,300 --> 01:12:41,840 The Logan as well as the Meridian is what they're being referred to as. 948 01:12:42,360 --> 01:12:48,160 They do have two-car garages as well as spaces for parking on the individual driveways. 949 01:12:48,900 --> 01:12:54,440 We did look at that to make sure that when cars are parked on the driveways that they're 950 01:12:54,440 --> 01:13:01,800 not going to extend onto sidewalks or as discussed, if it remains without the sidewalk on the 951 01:13:01,800 --> 01:13:07,180 eastern end of these townhomes, that the vehicles would not back out onto the street. 952 01:13:07,400 --> 01:13:11,360 So they have provided dimensions which do show cars can park there without obstructing. 953 01:13:12,120 --> 01:13:15,960 And then they also have 15 guest spaces, as was talked about earlier. 954 01:13:15,960 --> 01:13:20,120 They're scattered about in these areas by the mail kiosk and then over in this area. 955 01:13:20,580 --> 01:13:24,400 So even in addition to that, there's some additional guest parking that has been built. 956 01:13:26,850 --> 01:13:32,470 Site coverage you can see here for lot 16 is 27.6%. 957 01:13:32,470 --> 01:13:37,670 And I don't know if I mentioned it, but there's a lot of common ground as well as 958 01:13:37,670 --> 01:13:38,810 you can see here. 959 01:13:39,090 --> 01:13:44,550 This is an undisturbed area that's part of our stream bank buffer requirement so 960 01:13:44,550 --> 01:13:45,910 you can't develop in this area. 961 01:13:45,910 --> 01:13:53,430 They're staying out of it, but in turn that obviously restricts the site quite a bit in order to not utilize this portion. 962 01:13:55,450 --> 01:14:01,470 The pedestrian plan, a lot of discussion I heard about the pedestrian plan tonight and just a few comments that I might have on that. 963 01:14:01,610 --> 01:14:06,290 I think Kate with the project engineer explained it very well. 964 01:14:06,790 --> 01:14:11,030 We talked extensively about the sidewalk plan and in terms of the staff review. 965 01:14:11,030 --> 01:14:15,250 I think we've got a plan here that ties in very well with the planned sidewalk 966 01:14:15,250 --> 01:14:21,130 network for Olio Village. We are having a sidewalk here that will connect all of 967 01:14:21,130 --> 01:14:24,650 the units that are frontward facing toward the road. You can see the walkways 968 01:14:24,650 --> 01:14:28,830 will come out and you can go directly to a sidewalk and walk along the 969 01:14:28,830 --> 01:14:31,650 frontage and then that will tie into the rest of the development so very 970 01:14:31,650 --> 01:14:36,170 walkable in that regard. They also have sidewalks that enter into the 971 01:14:36,170 --> 01:14:39,690 development and serve the guest faces. And then as we talked about earlier 972 01:14:39,690 --> 01:14:44,970 on the western end here on the on one side of the street. Staff also ask for 973 01:14:44,970 --> 01:14:49,370 reasons why the sidewalk cannot be placed on the eastern bank of the 974 01:14:49,370 --> 01:14:52,950 buildings. And I think the response you heard tonight is the same reasons that 975 01:14:52,950 --> 01:14:57,290 we were given that would that it would impact the height of the wall. There's 976 01:14:57,290 --> 01:14:59,690 some site constraints here and so forth. 977 01:15:00,420 --> 01:15:10,820 But I would say that I think, based on what I've heard tonight, I think the commission should consider that a little bit further in terms of whether it is feasible or it's not like there would be some trade-offs. 978 01:15:10,920 --> 01:15:18,460 There are some concerns with that, but you can certainly consider that in your motion tonight if you're ready to move forward with it, that that be explored a little bit further. 979 01:15:18,880 --> 01:15:25,920 So there's cars that can drive in there too, or can you go through the way of finding from a car perspective versus a sidewalk? 980 01:15:25,920 --> 01:15:31,300 Yeah. So there are two entrances here. This is the northern entrance. It's a little hard to see here. 981 01:15:33,140 --> 01:15:40,120 This shows it may be a little bit better. So this is the entrance here. So you're coming – this is the bare interchange with Lindberg here. 982 01:15:40,280 --> 01:15:44,680 The bare overpass is here. And so you would come in through here and you can enter in this way as well. 983 01:15:44,980 --> 01:15:49,920 And there's a cul-de-sac. And these are the units where you will pull into the units in the rear right here, okay? 984 01:15:49,920 --> 01:15:53,080 So the frontage faces on to Olea Cove, this road. 985 01:15:53,720 --> 01:15:56,640 And so it's different when you come over these sides. 986 01:15:56,820 --> 01:16:01,640 These now front toward the internal street and the backs of the units are on this side. 987 01:16:01,900 --> 01:16:04,560 So that's the difference in the model styles that you're seeing. 988 01:16:05,260 --> 01:16:07,260 And then the secondary access that we talked about. 989 01:16:07,340 --> 01:16:09,260 Again, we had lots of discussions on this as well. 990 01:16:09,340 --> 01:16:15,080 And the fire district and city ultimately really required two access points to this development. 991 01:16:15,080 --> 01:16:22,360 But can you talk about where the road is versus the sidewalk down the middle of the others there? 992 01:16:22,640 --> 01:16:25,580 Yeah. So the road is going to be sitting right here next to it. It's a little hard to see, 993 01:16:25,640 --> 01:16:29,460 but it just sits right next to it when it comes through here. And this is the island that was 994 01:16:29,460 --> 01:16:34,320 discussed earlier where you can come in here. It splits with this landscape median, 995 01:16:34,320 --> 01:16:37,820 and you can make this turn and come into development. When you're coming out of the 996 01:16:37,820 --> 01:16:40,100 development, you're going to make this turn and come back out. 997 01:16:44,680 --> 01:16:45,620 And so this is the main 998 01:16:45,620 --> 01:16:49,160 This is sort of a secondary entrance, although, you know, it's full access. 999 01:16:49,880 --> 01:16:54,620 And so you'll come in, you can come into the side here, then you can also go into here to access the garages, 1000 01:16:54,620 --> 01:16:56,680 and there's a court to turn around. 1001 01:16:57,240 --> 01:16:57,740 Come back up. 1002 01:16:57,780 --> 01:17:01,920 So where's the parking for the ones, say, on the right at the bottom? 1003 01:17:02,360 --> 01:17:02,760 Right here? 1004 01:17:03,040 --> 01:17:03,140 Yeah. 1005 01:17:03,540 --> 01:17:05,880 So these units face inward toward the street. 1006 01:17:06,820 --> 01:17:10,040 So both of these units, if you can pitch this, will face each other. 1007 01:17:10,380 --> 01:17:10,660 Okay. 1008 01:17:10,800 --> 01:17:11,060 Okay. 1009 01:17:11,120 --> 01:17:12,260 And the parking is in the front. 1010 01:17:12,260 --> 01:17:13,280 And the parking is in the front. 1011 01:17:13,280 --> 01:17:17,320 So you'll pull in, you'll have a driveway, you'll park, and then you'll be able to go into the unit from here. 1012 01:17:17,560 --> 01:17:23,100 And so the back of the units are facing this way on this side and this way here. 1013 01:17:23,520 --> 01:17:25,080 The opposite is true up here. 1014 01:17:25,500 --> 01:17:31,380 And this creates a nicer appearance, so the main road coming through here, you will have the frontage of the units facing this street. 1015 01:17:32,020 --> 01:17:34,260 And you'll be able to enter the units in the back. 1016 01:17:34,660 --> 01:17:36,220 Where are the guests parking? 1017 01:17:36,620 --> 01:17:40,460 So yeah, like we said earlier, there are spaces to park on the driveway. 1018 01:17:40,460 --> 01:17:44,060 Our code requires two spaces per unit, so they're meeting that. 1019 01:17:44,320 --> 01:17:46,840 We don't have any code requirements for guest parking. 1020 01:17:47,080 --> 01:17:48,580 However, they are accounting for that. 1021 01:17:48,840 --> 01:17:51,940 And you can see here, here's banks of on-street guest parking, 1022 01:17:52,220 --> 01:17:53,720 and there's some here as well. 1023 01:17:54,040 --> 01:17:56,340 And then a couple of spaces near the mail kiosk. 1024 01:17:57,700 --> 01:18:02,020 Jason, is that a public road that sort of wraps all the way around? 1025 01:18:02,160 --> 01:18:02,380 Yes. 1026 01:18:02,700 --> 01:18:05,760 Can you – let me jump there. 1027 01:18:05,760 --> 01:18:07,060 better to understand it. 1028 01:18:08,780 --> 01:18:10,760 This I think shows it here. 1029 01:18:10,920 --> 01:18:11,560 Here's a street plan. 1030 01:18:12,240 --> 01:18:13,460 So this is the public road. 1031 01:18:13,520 --> 01:18:14,660 This probably shows it a lot. 1032 01:18:15,620 --> 01:18:18,440 This is the public roadway system here in Hollywood. 1033 01:18:18,600 --> 01:18:23,680 So everything you see in gray is a public street to be dedicated to the city upon completion. 1034 01:18:24,380 --> 01:18:25,560 So this is the roadway network. 1035 01:18:25,980 --> 01:18:29,660 Everything that you see in orange is a private street. 1036 01:18:29,800 --> 01:18:31,540 So the city is not maintaining those streets. 1037 01:18:31,740 --> 01:18:32,120 They're private. 1038 01:18:32,120 --> 01:18:36,100 And that is the case here with these internal streets for this town hall. 1039 01:18:36,320 --> 01:18:41,380 Is there going to be a lot of light and through traffic going to the town halls on the Orange Street there? 1040 01:18:41,520 --> 01:18:51,580 No. We would not anticipate that. No. And that's why I think, you know, they will have some signage as well at these entry points to designate it as a residential area. 1041 01:18:51,980 --> 01:18:59,420 And so I think, you know, I would not anticipate that you're going to come through here and either if you're going to the Schnooks area or the Main Street, you're going to come through here. 1042 01:18:59,420 --> 01:19:05,900 You also have another access way through here to get you to the main street. So for pedestrians to be less traffic on the private 1043 01:19:05,900 --> 01:19:10,760 I would yes, that would be the expectation. Yes, it's a private residential street 1044 01:19:10,760 --> 01:19:14,300 They are not proposing it to be gated because I think they want it to be 1045 01:19:14,300 --> 01:19:19,700 You know open to the residents, but it but it would be privately maintained and they are private streets 1046 01:19:19,700 --> 01:19:22,680 and then why are the streets back to be dedicated? 1047 01:19:23,600 --> 01:19:24,000 because 1048 01:19:24,000 --> 01:19:38,420 Because a couple of things is our Pollock Works Department reviewed it and due to the configuration with the townhomes, with snow clearing, a little challenging with that, and just the maintenance of some of the lots in there. 1049 01:19:38,740 --> 01:19:41,760 And the street really just only serves this lot. 1050 01:19:41,900 --> 01:19:44,640 It doesn't serve any other portion of the development. 1051 01:19:45,140 --> 01:19:47,780 We talked about the roadway network. 1052 01:19:48,420 --> 01:19:52,920 You don't need these roads to be able to service the rest of the projects. 1053 01:19:52,920 --> 01:20:00,160 And so the builders read with that, and they're proposing it to be maintained by the HOA as private streets. 1054 01:20:01,120 --> 01:20:04,760 I said snow removal. I do want to check whether our public works for them. 1055 01:20:04,860 --> 01:20:11,060 We might actually file this because they are a residential owner occupant, so I can check on it. 1056 01:20:12,100 --> 01:20:16,900 But those were some of the reasons why it was decided and recommended that it be filed. 1057 01:20:16,900 --> 01:20:22,480 Street 4 would provide services in the streets there, but they're not going to be dedicated. 1058 01:20:23,080 --> 01:20:29,120 That's right. They would be privately maintained, and it would be up to the HOA to maintain those roads as a private street. 1059 01:20:29,560 --> 01:20:31,340 But they're not going to maintain it for Smilton. 1060 01:20:32,920 --> 01:20:43,700 I have to check on that, but I believe our policy with the city is that any street that is owner-occupied, as owner-occupied residential, the city does go ahead and plow those for safety reasons. 1061 01:20:44,960 --> 01:20:47,240 And if we damage the streets with responsibility. 1062 01:20:48,400 --> 01:20:53,040 It would probably be our insurance policy if it is a result of damage by the city. 1063 01:20:53,200 --> 01:20:59,080 And that is something I think that our Public Works Department deals with some time to time with mailbox damages and things like that. 1064 01:21:00,020 --> 01:21:01,780 Jason, what about fire trucks? 1065 01:21:02,120 --> 01:21:02,340 Yes. 1066 01:21:04,100 --> 01:21:07,060 So I'm jumping around here, but you're asking good questions. 1067 01:21:07,880 --> 01:21:12,000 So this is the amendment for the turnrages. 1068 01:21:12,780 --> 01:21:16,620 And so this is a discussion that we had with the applicant as well as the Fire District. 1069 01:21:17,360 --> 01:21:22,440 There were some early concerns about this was going to originally be a CODIS Act. 1070 01:21:23,180 --> 01:21:26,240 The Fire District had some concerns they would like access there. 1071 01:21:26,420 --> 01:21:29,120 It was considered as an emergency only access configuration. 1072 01:21:29,800 --> 01:21:33,540 I think working amongst all the parties, we prefer this to be full access. 1073 01:21:33,540 --> 01:21:39,900 But in order to do that, we had to vary the ordinance just for lot 16 to allow a little bit tighter of a radius. 1074 01:21:40,660 --> 01:21:44,620 But the fire district has reviewed the access plan, and they are comfortable with it. 1075 01:21:44,700 --> 01:21:48,800 We have an email that says they're comfortable with this line. 1076 01:21:51,780 --> 01:21:54,500 In fact, that says it like that. 1077 01:21:58,100 --> 01:22:02,400 So just continuing, unless there's any other questions on that, I'll move forward. 1078 01:22:05,760 --> 01:22:08,440 Okay, I think we covered the pedestrian plan well. 1079 01:22:08,880 --> 01:22:15,980 The preliminary plan, again, it lays out all of the pertinent information in terms of access to the property. 1080 01:22:16,300 --> 01:22:20,080 You can see here 6.6 acres of that is common ground or used for stormwater. 1081 01:22:21,380 --> 01:22:27,440 The covenants for the subdivision indentures, those have been submitted and reviewed by Mr. Lumley, our city attorney. 1082 01:22:27,440 --> 01:22:33,540 Those are acceptable in terms of the private indentures for the commoner association. 1083 01:22:34,680 --> 01:22:39,720 And then lot 16, the tree preservation plan you can see here that has also been reviewed. 1084 01:22:39,860 --> 01:22:45,620 And there are trees that will be removed, 55 viable trees, and then 72 will be remained. 1085 01:22:45,740 --> 01:22:49,500 And that results in a 43.3% tree removal calculation. 1086 01:22:50,620 --> 01:22:54,740 And then you can see here this is the landscape plan, heavily landscaped along the perimeter. 1087 01:22:54,740 --> 01:22:57,800 So you'll have street trees around the whole perimeter of the site. 1088 01:22:59,080 --> 01:23:04,520 And then these will be left undisturbed within the watercourse area, as well as on the perimeter 1089 01:23:04,520 --> 01:23:07,740 outside of the technical boundaries of lot 16. 1090 01:23:08,340 --> 01:23:12,960 All of the trees that are in this area, as you can imagine, those will have to be removed, 1091 01:23:13,060 --> 01:23:16,500 but you can see all the new trees that will be planted in each and every six years. 1092 01:23:17,600 --> 01:23:23,080 We do have a condition, however, to require irrigation. 1093 01:23:23,080 --> 01:23:24,760 We have discussed that with the applicant. 1094 01:23:25,380 --> 01:23:29,720 But we are expecting or recommending that the irrigation be provided along the frontages, 1095 01:23:29,820 --> 01:23:35,860 as well as at the entry areas to be made within common ground areas to be maintained by the Agile. 1096 01:23:37,480 --> 01:23:43,300 You can see here, these are just the typical details of how each of the entries would be landscaped. 1097 01:23:43,800 --> 01:23:47,660 You can see there's landscaping within the lawn areas in between the units. 1098 01:23:47,880 --> 01:23:49,080 This is a typical design. 1099 01:23:50,360 --> 01:23:53,700 And then I think we've covered this pretty well, but this is the Meridian models. 1100 01:23:53,900 --> 01:23:56,240 Like I said, these are the ones that face outward toward the street. 1101 01:23:56,380 --> 01:23:59,580 And these are the Logan models that face inward toward the private street. 1102 01:24:01,320 --> 01:24:03,100 And these are the building elevations. 1103 01:24:03,240 --> 01:24:10,160 You can see here these are a more flat elevation, but they have percrusions with the box bays and other elements like canopies. 1104 01:24:10,560 --> 01:24:13,560 These are what you're going to see along here. 1105 01:24:13,560 --> 01:24:17,420 Okay, so this is what you're going to see along Ole Cove, the main road. 1106 01:24:17,920 --> 01:24:23,780 And then when you transition here, you can see now how the entry also has the garages toward the street. 1107 01:24:24,280 --> 01:24:31,120 So this is different because this has the garage behind it, but this is the main frontage on Ole Cove. 1108 01:24:32,200 --> 01:24:35,780 They look very similar. This has a little bit more relief, which we do like. 1109 01:24:36,560 --> 01:24:42,780 This one is a little bit more squared off, but it's because of the configuration I suppose with the garages. 1110 01:24:44,280 --> 01:24:46,780 And then we do have a little material here, 1111 01:24:50,630 --> 01:24:51,930 these would be the brick colors. 1112 01:24:57,180 --> 01:25:02,480 You can see the upper portion here is going to be that white wash sort of whiteish brick. 1113 01:25:02,940 --> 01:25:06,340 The lower portion will be the darker tan gray color here. 1114 01:25:07,660 --> 01:25:14,320 It is consistent, we feel like with the kind of architectural theme of Ole Village having these shades of color, 1115 01:25:14,480 --> 01:25:17,220 so we weren't any, didn't have concerns about that. 1116 01:25:18,160 --> 01:25:21,060 I did want to touch base on the side. 1117 01:25:21,260 --> 01:25:24,480 So the side elevations in the rear will be fiber cement lap siding. 1118 01:25:24,680 --> 01:25:26,440 Those will not have the brick returns. 1119 01:25:27,580 --> 01:25:31,120 However, discussing with the applicant, we do have a condition, 1120 01:25:31,460 --> 01:25:35,560 and their plans do show this, that what they call the high impact area. 1121 01:25:35,740 --> 01:25:39,200 So it's the end of these units here, here, here. 1122 01:25:40,260 --> 01:25:42,140 As I'm pointing around, it's the ends. 1123 01:25:42,520 --> 01:25:46,900 Those will have full return brick, okay, on all of the ends like that. 1124 01:25:46,900 --> 01:25:53,980 So the ones that are more internal that you really can't see that aren't very visible, those will have to lap the siding on the sides and the rear. 1125 01:25:58,800 --> 01:26:04,840 The lighting just quickly here, 16-foot poles that matches our ordinance. We'll have a modern fixture, again, 1126 01:26:05,620 --> 01:26:10,020 complementary with the Olio Village design. You can see the detail of the fixture there. 1127 01:26:10,180 --> 01:26:15,460 3,000 temperature rating for the color, temperature, shielded and downcast as well. 1128 01:26:16,100 --> 01:26:18,340 And then these are the entry signs that are proposed. 1129 01:26:18,580 --> 01:26:19,600 One at each of the entrances. 1130 01:26:21,140 --> 01:26:25,840 And we do have a condition of approval that the final design be approved by staff 1131 01:26:25,840 --> 01:26:29,360 and that they have landscaping incorporated at the base of the sign. 1132 01:26:29,940 --> 01:26:32,240 So we would like to have that achieved. 1133 01:26:32,820 --> 01:26:37,200 And then when the master sign plan for all of Olia is developed, 1134 01:26:37,340 --> 01:26:39,700 these would be folded into that master sign plan. 1135 01:26:39,820 --> 01:26:41,840 So these would be the signs allowed for the residential. 1136 01:26:43,040 --> 01:26:45,800 And then this is a design for the male kiosk. 1137 01:26:45,880 --> 01:26:49,960 You can see it follows a lot of same design treatment as the individual townhomes, 1138 01:26:50,500 --> 01:26:53,520 these were the mailboxes would be toward the front of the, 1139 01:26:53,540 --> 01:26:54,320 front of the building. 1140 01:26:56,580 --> 01:26:59,840 I think stormwater was discussed pretty well earlier, 1141 01:26:59,960 --> 01:27:03,820 but they are required to detain water on this site 1142 01:27:03,820 --> 01:27:07,660 in terms of water quality. You can see those areas here, but the entire 1143 01:27:07,660 --> 01:27:11,680 old village development was planned under master stormwater project with 1144 01:27:11,680 --> 01:27:19,980 So they're just required really to detain it for water quality on their site that would flow into the already designed system here. 1145 01:27:22,240 --> 01:27:26,220 And then just the amendments, really, what we're talking about in terms of the site and concept amendments. 1146 01:27:26,760 --> 01:27:33,260 You can see here this follows the updated plan that was sort of left to be determined until this was developed. 1147 01:27:33,780 --> 01:27:42,260 So the amendments really are just limited to updating the entire concept plan for OLA Village to incorporate the site plan associated with this proposal. 1148 01:27:42,260 --> 01:27:45,200 So do we have the tree preservation piece? 1149 01:27:45,700 --> 01:27:46,620 Yes, we do, right here. 1150 01:27:47,320 --> 01:27:50,400 So this was also, we also asked them to update this 1151 01:27:50,400 --> 01:27:52,600 in accordance with the latest approved version, 1152 01:27:53,340 --> 01:27:54,580 and they have done so. 1153 01:27:54,680 --> 01:27:55,860 You can see these are remaining. 1154 01:27:56,640 --> 01:28:01,240 That's green, and these are shaded blue or purple, 1155 01:28:01,320 --> 01:28:02,240 depending on the size. 1156 01:28:02,780 --> 01:28:04,860 All of these inside development will be removed, 1157 01:28:04,960 --> 01:28:07,500 but as I saw you, as I showed you with the plan, 1158 01:28:07,800 --> 01:28:09,580 all of these will be replaced with their trees. 1159 01:28:09,580 --> 01:28:11,360 These on the outer portion? 1160 01:28:13,000 --> 01:28:17,720 Replacement is per the oleavillage standard, which is any tree that it's viable, 1161 01:28:18,160 --> 01:28:19,000 meaning good condition. 1162 01:28:19,640 --> 01:28:21,320 Six inches or better is a one-to-one. 1163 01:28:21,880 --> 01:28:24,040 If it's 20 inches or greater, it's two-to-one. 1164 01:28:27,130 --> 01:28:32,370 And then I think I already talked about the geometry of the welding standard. 1165 01:28:34,650 --> 01:28:37,950 Do have some recommended conditions for approval for you, 1166 01:28:39,490 --> 01:28:41,070 Depending on any further discussion, 1167 01:28:41,690 --> 01:28:43,610 I believe that's also in your staff, of course, as well, 1168 01:28:43,630 --> 01:28:47,550 but we would need two separate motions for approval tonight. 1169 01:28:49,520 --> 01:28:52,120 So I think I don't really understand the sidewalk. 1170 01:28:52,440 --> 01:28:58,120 So if I walk out the front door and I don't have a sidewalk, 1171 01:28:58,400 --> 01:29:01,920 I just go to the street or, like, that's super clear. 1172 01:29:02,500 --> 01:29:03,420 That is exact. 1173 01:29:03,660 --> 01:29:05,420 That is what's being proposed. 1174 01:29:06,080 --> 01:29:09,880 So let me get back to that right here. 1175 01:29:11,640 --> 01:29:17,500 So all of these units will have directly accessible to a sidewalk. 1176 01:29:18,140 --> 01:29:20,600 So your walk, again, this is the front of the unit. 1177 01:29:20,740 --> 01:29:27,180 So you will be able to walk onto a sidewalk here and then along here so you'll have direct access to a sidewalk. 1178 01:29:27,540 --> 01:29:33,840 The same is true for these units here because this is where the sidewalk goes through the property on this side of the street. 1179 01:29:33,840 --> 01:29:40,460 And then that takes you down toward the secondary entrance, and then it ties in with the main olias sidewalk system through here. 1180 01:29:40,980 --> 01:29:51,440 So what's being discussed and what we have brought up as well is that, you know, we did ask for sidewalks on this side of the street as well. 1181 01:29:51,760 --> 01:29:59,240 Because right now you would have a sidewalk from your front porch that would just end at the street. 1182 01:30:00,210 --> 01:30:02,170 Is that what that was talking about? 1183 01:30:02,170 --> 01:30:09,230 Well, there would be, I think there would be a walkway that would lead, like a walkway to the front of the home that would lead to your driveway. 1184 01:30:14,850 --> 01:30:19,010 I'm trying to see if there's something that illustrates that. Yeah, you can see this. See here. 1185 01:30:19,390 --> 01:30:25,490 So this is the entry. You can see this is the walkway up to the entry of the town home, and then it would just go onto your driveway, 1186 01:30:25,530 --> 01:30:30,030 just like a regular single-family block where you had your driveway and then you can walk. 1187 01:30:30,630 --> 01:30:32,310 There's a walkway that takes you up to your front door. 1188 01:30:38,480 --> 01:30:46,160 So if there's concerns about this sidewalk night, trying to get there, 1189 01:30:50,720 --> 01:30:51,020 break it. 1190 01:30:51,520 --> 01:30:55,060 If there are concerns with this, I think that's something you all could discuss, 1191 01:30:55,180 --> 01:31:00,240 and that could be a recommendation to City Council that the developer provide sidewalks. 1192 01:31:00,240 --> 01:31:06,740 And then based on that, on the eastern end of the site, then that's something that they could explore 1193 01:31:06,740 --> 01:31:10,980 and they could present to council, and if there's real engineering concerns or other concerns, 1194 01:31:11,100 --> 01:31:14,580 they could present that information to the city council. That could be part of your recommendation 1195 01:31:14,580 --> 01:31:18,340 if you chose to do that. Why can't they come back and present it to us? 1196 01:31:18,600 --> 01:31:23,260 They could, if you wanted to continue that, they can, but if I think there's other... 1197 01:31:24,000 --> 01:31:29,800 It's our job that we don't typically accept stuff that counts until it's done. 1198 01:31:30,840 --> 01:31:36,040 Yeah, I'm telling you, you have the option. If you feel like that's the only thing that 1199 01:31:36,040 --> 01:31:42,740 is outstanding. That's something I think I'm hearing the applicant tonight. They 1200 01:31:42,740 --> 01:31:47,660 could review that, study it, and be prepared to probably present that at the 1201 01:31:47,660 --> 01:31:51,660 City Council. But if you want them to come back, that is your program to do so 1202 01:31:51,660 --> 01:31:56,540 as well. All right, see what that looks like. And also, I was looking at the 1203 01:31:56,540 --> 01:32:02,640 condition. We don't have any irrigation. We do. It isn't? Yes. Okay. It is. 1204 01:32:04,120 --> 01:32:05,780 And just a couple of comments. 1205 01:32:07,360 --> 01:32:12,820 The first speaker who spoke, maybe not directly, not the project, 1206 01:32:13,420 --> 01:32:15,880 but did mention some of the headlight concerns. 1207 01:32:16,560 --> 01:32:19,320 I believe what's being discussed is this part right here. 1208 01:32:19,440 --> 01:32:22,880 When you come out, you know, the vehicles will be turning here, right? 1209 01:32:23,540 --> 01:32:27,660 And so that could also be a condition where there's some additional landscaping 1210 01:32:27,660 --> 01:32:30,020 that is proposed to help shield that. 1211 01:32:30,020 --> 01:32:32,380 I think that's something that could be worked into the project as well. 1212 01:32:33,360 --> 01:32:36,340 Where is the trash or how is the trash damaged? 1213 01:32:37,940 --> 01:32:42,620 I'll let the applicant speak to that, but my understanding is they will be just like a regular home. 1214 01:32:42,740 --> 01:32:46,960 Your home, they'll be in the unit and they'll be taken out during trash days and put back. 1215 01:32:47,080 --> 01:32:54,660 There is no common refuse collection for the individual trash collections. 1216 01:32:56,100 --> 01:33:01,120 And are the garages big enough that they can be put inside? 1217 01:33:01,440 --> 01:33:09,900 Because that would be a lot of trash bins everywhere in a small space if there's not room to put them somewhere. 1218 01:33:13,300 --> 01:33:15,540 It would be our intention that the trash cans be inside. 1219 01:33:15,760 --> 01:33:21,980 Typically our CCNRs or our indentures prevent the trash cans from being stored anywhere but the garage. 1220 01:33:22,280 --> 01:33:26,240 And so are the garages large enough to have two cars and trash bins? 1221 01:33:26,360 --> 01:33:27,420 Yes, no matter how they're designed. 1222 01:33:27,420 --> 01:33:28,820 Okay. Thank you. 1223 01:33:33,460 --> 01:33:34,060 Thank you. 1224 01:33:34,600 --> 01:33:35,460 Any other questions? 1225 01:33:36,540 --> 01:33:36,700 Okay. 1226 01:33:38,440 --> 01:33:40,380 Yes, I'm sorry. 1227 01:33:40,580 --> 01:33:40,660 Yes. 1228 01:33:40,820 --> 01:33:43,680 That area that down at the corner of that, 1229 01:33:44,760 --> 01:33:46,220 well, we had a nice question. 1230 01:33:46,940 --> 01:33:47,500 Yes. 1231 01:33:48,080 --> 01:33:49,700 About additional landscaping. 1232 01:33:49,820 --> 01:33:50,120 Mm-hmm. 1233 01:33:50,560 --> 01:33:53,720 Would you articulate what our suggestion might be 1234 01:33:53,720 --> 01:33:55,460 if we were to move the lesson? 1235 01:33:55,700 --> 01:33:55,800 Yeah. 1236 01:33:55,940 --> 01:34:00,140 That the revised landscape plan be amended to provide evergreen shrubs 1237 01:34:00,140 --> 01:34:08,700 to shield the headlight glare to reduce the headlight glare coming out of the southern 1238 01:34:08,700 --> 01:34:09,040 entrance. 1239 01:34:12,810 --> 01:34:15,210 And we're talking about this area right in here. 1240 01:34:15,490 --> 01:34:22,570 So help me out here. I'm trying to answer for myself why we don't have sidewalks on 1241 01:34:22,570 --> 01:34:27,430 those sides of the street. And the only reason I can come up with the 1242 01:34:27,430 --> 01:34:30,990 it was at the convenience for the developer, 1243 01:34:33,120 --> 01:34:35,320 not for the convenience of everybody who's 1244 01:34:35,320 --> 01:34:41,500 going to buy a house to enter in and for what they think what the preference might be for 1245 01:34:41,500 --> 01:34:49,420 Creev4 for our standards. I'm just going to have the thumb like stuck myself. And I like 1246 01:34:49,420 --> 01:34:57,040 to see this, for me, I like to see this redrafted, I would call it up to Creev4 standards. 1247 01:34:59,000 --> 01:35:03,880 and see what that looks like so that, and instead of guessing behind the fence, 1248 01:35:04,300 --> 01:35:08,740 we would know what an advance is going to be, a foot taller or a 30 feet taller, 1249 01:35:09,100 --> 01:35:14,580 so that we would have some specific answers so that we could come up with a specific response. 1250 01:35:15,480 --> 01:35:19,820 Right now, to me, it's kind of negrous. It's got a lot of really good work, 1251 01:35:20,460 --> 01:35:24,720 because it's a project, but I think we need just a little bit more help there. 1252 01:35:27,420 --> 01:35:29,720 I think I can answer a little bit of that. 1253 01:35:30,080 --> 01:35:30,140 Okay. 1254 01:35:30,620 --> 01:35:33,120 So one is the retaining wall. 1255 01:35:33,700 --> 01:35:34,480 It's right here. 1256 01:35:35,400 --> 01:35:36,900 This is the retaining wall we're talking about. 1257 01:35:37,660 --> 01:35:41,920 This retaining wall, the face of the wall faces inward towards the wall. 1258 01:35:42,360 --> 01:35:44,260 So it's going to face this one. 1259 01:35:45,280 --> 01:35:50,700 So I think the discussion you heard from the project engineer is, you know, 1260 01:35:50,760 --> 01:35:52,500 these units are going to back up to that. 1261 01:35:52,500 --> 01:35:56,320 And when you're looking out the back of your unit, you're going to see a wall, 1262 01:35:56,500 --> 01:36:01,120 but there's also going to be some landscapes, as you can see right in here. 1263 01:36:03,240 --> 01:36:08,020 From their perspective, in terms of cellability, it sounds like, you know, 1264 01:36:08,040 --> 01:36:10,500 they don't want to get too close to that or they don't want the wall too high. 1265 01:36:11,020 --> 01:36:12,320 They haven't engineered it. 1266 01:36:12,420 --> 01:36:14,880 It sounds like they haven't engineered all the specifications. 1267 01:36:15,140 --> 01:36:20,740 But for purposes this evening, if you're so inclined, you could make a recommendation 1268 01:36:20,740 --> 01:36:23,680 because you are the recommending body to the City Council on this, 1269 01:36:23,840 --> 01:36:25,420 if the final approval rests within. 1270 01:36:25,820 --> 01:36:31,000 You could include a recommendation that a sidewalk be provided on the east side of the internal street 1271 01:36:31,000 --> 01:36:33,280 to service all the units on that street. 1272 01:36:33,640 --> 01:36:38,720 And that's something that they can explore and be able to present that to the City Council. 1273 01:36:39,680 --> 01:36:45,960 And I would envision that it would follow the same configuration that you see here. 1274 01:36:45,960 --> 01:36:50,600 You're going to see another red line up on the east side of that street. 1275 01:36:52,300 --> 01:36:59,820 I'm not here to design it, but just one question, I guess, for the designer is that, so we're 1276 01:36:59,820 --> 01:37:01,080 on the east side. 1277 01:37:02,040 --> 01:37:07,440 Yeah, the sidewalk is actually on the opposite side of the street of that first half of 1278 01:37:07,440 --> 01:37:08,560 the units. 1279 01:37:09,300 --> 01:37:10,840 Is there a reason why that is? 1280 01:37:10,840 --> 01:37:17,060 why can't we just put the sidewalk on the condo side of the street or the town 1281 01:37:17,060 --> 01:37:21,800 home side of the street and then get all the way halfway down and then you could 1282 01:37:21,800 --> 01:37:27,200 end up with sidewalk on both sides of the street from there. I just don't 1283 01:37:27,200 --> 01:37:32,520 understand and me being trying to be logical here if I'm coming out of my 1284 01:37:32,520 --> 01:37:38,460 home on top right I have to walk across the street to get to the 1285 01:37:38,460 --> 01:37:44,720 sidewalk why aren't we just putting a sidewalk on I'm thinking tongue-in-cheek 1286 01:37:44,720 --> 01:37:51,240 correct side of the street yeah I think and I would I would ask the applicant to 1287 01:37:51,240 --> 01:37:55,500 come up and and state if they had any other thoughts on these on this on these 1288 01:37:55,500 --> 01:38:02,740 questions but in my view that could be a situation that be added to the to the 1289 01:38:02,740 --> 01:38:06,600 eastern side of the of the properties because then you end up with sidewalk 1290 01:38:08,400 --> 01:38:11,620 And is anybody even going to use the one on the other side? 1291 01:38:13,080 --> 01:38:18,420 Right now, you have, if you're in one of these units to your point, you're going to have to process the street to get to a side road. 1292 01:38:18,680 --> 01:38:18,920 Right. 1293 01:38:19,400 --> 01:38:19,740 Okay. 1294 01:38:20,060 --> 01:38:26,100 Now, you know, it's a narrow residential street that doesn't have a lot of traffic going through it. 1295 01:38:26,100 --> 01:38:29,520 So it's not, you know, you have that aspect of it. 1296 01:38:29,680 --> 01:38:34,560 But it's, you know, certainly not as convenient as if you walked out and you have a sidewalk right in front. 1297 01:38:34,560 --> 01:38:39,660 So it sounds like there's some engineering compromises, perhaps. 1298 01:38:39,940 --> 01:38:41,880 Maybe that wall would have to go up a little higher. 1299 01:38:42,320 --> 01:38:46,660 But if it's important to the commission, then I think that could be part of your recommendation, 1300 01:38:47,020 --> 01:38:48,940 and then the applicant could speak to that as well, 1301 01:38:48,980 --> 01:38:52,820 if that's something they are comfortable moving forward with as well. 1302 01:38:53,480 --> 01:38:59,780 But it doesn't even affect the wall if you just move the single sidewalk to the other side. 1303 01:39:00,160 --> 01:39:02,820 Correct. Push the street over, put the sidewalk over there. 1304 01:39:02,820 --> 01:39:04,760 I would have to ask the engineer. 1305 01:39:05,100 --> 01:39:10,360 And again, maybe there's some structural or civil thing that doesn't allow a string. 1306 01:39:11,100 --> 01:39:17,700 I mean, the easiest path would be to ask to put the sidewalk on the Houston side of the streets. 1307 01:39:18,440 --> 01:39:21,160 Then you could double up the bottom, perhaps. 1308 01:39:27,360 --> 01:39:27,920 Please. 1309 01:39:30,260 --> 01:39:35,920 We could, in speaking with our engineer, we could add the sidewalk on this side, 1310 01:39:35,920 --> 01:39:41,060 And then we could investigate moving this portion of the sidewalk to the eastern side. 1311 01:39:41,720 --> 01:39:43,000 Would that be amenable? 1312 01:39:43,220 --> 01:39:47,680 If we looked into it, if we will commit to the southern half adding that sidewalk, 1313 01:39:48,160 --> 01:39:50,900 and then we'll investigate, I know that there are some utility conflicts, 1314 01:39:51,360 --> 01:39:56,320 and that's why that sidewalk was located on the western side of the street 1315 01:39:56,320 --> 01:39:58,300 and not the eastern side of that area. 1316 01:39:59,000 --> 01:40:00,380 But we can certainly look at that. 1317 01:40:00,900 --> 01:40:03,540 It's good to say the eastern side gets a lot more bones. 1318 01:40:06,730 --> 01:40:09,210 We will look at that. We will certainly look at that, 1319 01:40:11,780 --> 01:40:16,620 and we can certainly commit to screening in the southern portion as well. 1320 01:40:21,090 --> 01:40:32,320 I'd still like to see what this looks like. There's a lot of conjecture here, so can you draw it for us and bring it back? 1321 01:40:34,240 --> 01:40:43,320 Ideally, with our schedule, respectfully, would it be possible for us to obtain conditional approval? 1322 01:40:44,680 --> 01:40:51,620 And we will send a copy of what that would look like as well to Planning and Zoning Commission? 1323 01:40:53,260 --> 01:40:55,000 Is that something that you would consider? 1324 01:40:55,000 --> 01:40:55,860 I 1325 01:41:00,150 --> 01:41:02,010 think you can just share the approval. 1326 01:41:02,730 --> 01:41:05,610 We get complete plans and we vote for them. 1327 01:41:05,950 --> 01:41:12,750 Don't get incomplete plans that are subject to open issues, 1328 01:41:12,910 --> 01:41:14,710 which could be fairly significant. 1329 01:41:21,230 --> 01:41:22,410 I like to vote for it. 1330 01:41:22,510 --> 01:41:23,110 Just for me. 1331 01:41:23,390 --> 01:41:24,430 I like to vote for complete. 1332 01:41:25,250 --> 01:41:27,470 It is a major project. 1333 01:41:28,190 --> 01:41:32,190 We're talking hundreds of millions of dollars. 1334 01:41:32,810 --> 01:41:38,310 Here, part of CREACOR is for the next 50 years on great development. 1335 01:41:39,410 --> 01:41:42,710 You know, I think we're entitled to see something that's more complete. 1336 01:41:43,590 --> 01:41:45,930 We want this to be the best it can be for CREACOR. 1337 01:41:46,550 --> 01:41:50,370 So that's our job, I think. 1338 01:41:55,710 --> 01:41:56,370 Other questions? 1339 01:41:58,230 --> 01:41:59,290 No, Carl. 1340 01:41:59,610 --> 01:42:01,790 I will receive them. 1341 01:42:02,370 --> 01:42:05,850 Well, I think you want to see if there's any public comment since people might have 1342 01:42:05,850 --> 01:42:11,010 come, I don't know if that's already or not, but you do a motion to continue to, 1343 01:42:11,150 --> 01:42:15,650 and that's, you know, they may have an opportunity to make whatever change they 1344 01:42:15,650 --> 01:42:18,850 want to make based on the special. 1345 01:42:19,210 --> 01:42:19,450 Okay. 1346 01:42:19,890 --> 01:42:20,410 See you then. 1347 01:42:22,390 --> 01:42:26,030 But I think to their point just so you fully understand, so we don't have, 1348 01:42:26,630 --> 01:42:30,690 and correct me if I've gotten this backwards, but I don't believe we have 1349 01:42:30,690 --> 01:42:36,590 first meeting in January for P&Z so they would be coming back to the second 1350 01:42:36,590 --> 01:42:41,190 meeting in January and so then they would not be finished with the City Council 1351 01:42:41,190 --> 01:42:46,370 even on the two meeting assumptions until January. So that's one of their concerns 1352 01:42:46,370 --> 01:42:50,570 is to square at the time of the year where the meetings aren't as regular. 1353 01:42:56,440 --> 01:42:59,220 But I'm not saying that's influential or just giving me a footage. 1354 01:42:59,220 --> 01:43:04,700 Like, I'd be happy to come back for separate meetings, but I think both many of us would, 1355 01:43:04,840 --> 01:43:10,180 you know, to help the project move them on. But, I mean, we could have just 1356 01:43:10,180 --> 01:43:14,680 approved the project and you didn't have to turn in any things. I mean, that's 1357 01:43:14,680 --> 01:43:19,020 one possibility too, but that's asking, that's asking you for too much. 1358 01:43:20,660 --> 01:43:26,160 Okay, speaking for staff, I don't think they're looking to have to prepare for a 1359 01:43:26,160 --> 01:43:28,520 January meeting of the holidays. 1360 01:43:28,840 --> 01:43:30,020 It's one of the reasons we're canceling. 1361 01:43:30,460 --> 01:43:30,820 Yeah, okay. 1362 01:43:36,750 --> 01:43:37,090 Okay. 1363 01:43:37,390 --> 01:43:37,790 Thank you. 1364 01:43:41,440 --> 01:43:43,140 Anything further from staff at this time? 1365 01:43:43,260 --> 01:43:44,380 Or do you want to take all the comments? 1366 01:43:44,820 --> 01:43:46,540 I think we'll open it up for public comment. 1367 01:43:46,760 --> 01:43:49,880 I know Rachel is here. 1368 01:43:50,280 --> 01:43:52,620 Do you want to come up and speak about the trees or? 1369 01:44:03,270 --> 01:44:04,330 I'm Rachel Prozel. 1370 01:44:04,550 --> 01:44:06,590 I live at 12 Spady Woods, 1371 01:44:06,870 --> 01:44:08,190 which backs up to the development. 1372 01:44:08,850 --> 01:44:12,470 And I just want to thank you for your comment about wanting to make it the best it can be. 1373 01:44:13,230 --> 01:44:16,330 And I appreciate your consideration of all the factors involved. 1374 01:44:17,450 --> 01:44:20,210 I was hoping to hear more about the tree preservation plan. 1375 01:44:20,530 --> 01:44:25,790 That's sort of my primary concern because we were promised an undisturbed buffer, 1376 01:44:25,910 --> 01:44:26,950 and that is not what we got. 1377 01:44:27,410 --> 01:44:31,470 There's areas that he showed were undisturbed where there's no trees at all. 1378 01:44:31,710 --> 01:44:34,730 And I'm looking at a 14-foot retaining wall in my backyard. 1379 01:44:36,310 --> 01:44:42,590 And so the other thing I wanted to hear about this development, I mean, it doesn't directly impact my yard, but I think I'll be able to see it. 1380 01:44:42,710 --> 01:44:49,170 So I'd like to hear a little bit more about how this is going to impact the existing neighborhood streets. 1381 01:44:49,970 --> 01:44:50,850 What will our views be? 1382 01:44:50,910 --> 01:44:54,990 I know he said they're going to add trees along the streets, but what are they? 1383 01:44:55,090 --> 01:44:56,010 What's the elevations? 1384 01:44:57,270 --> 01:44:59,930 Because on a different view from this, there's a... 1385 01:45:00,000 --> 01:45:05,600 There's the detention basins, there's a square building, but I can see beyond that, so I think we'll be able to see this. 1386 01:45:06,740 --> 01:45:17,840 So I'd like to hear more about the tree preservation and what the city can do to make sure that the developers are holding true to what they say, because thus far we haven't seen that. 1387 01:45:19,880 --> 01:45:29,840 I know that there were irrigation issues. They haven't planted above the wall because there's no irrigation there yet, but part of that buffer they haven't done anything to replace the trees that they took. 1388 01:45:30,700 --> 01:45:31,420 Thank you. 1389 01:45:31,640 --> 01:45:32,000 Thanks. 1390 01:45:36,520 --> 01:45:41,400 I think there was another gentleman if you want to come up and share your name. 1391 01:45:45,910 --> 01:45:47,370 He was not smart enough. 1392 01:45:48,370 --> 01:45:48,510 No. 1393 01:45:49,350 --> 01:45:50,970 I live down Palo. 1394 01:45:51,890 --> 01:45:52,210 Okay. 1395 01:45:53,210 --> 01:45:54,450 My name is Tom. 1396 01:45:55,110 --> 01:45:55,170 Okay. 1397 01:45:55,830 --> 01:45:57,330 Rachel, can you come up and click? 1398 01:46:03,380 --> 01:46:05,320 So you're going to have to do it separately. 1399 01:46:06,300 --> 01:46:09,900 One, for the gentleman, what he's about to say isn't true. 1400 01:46:10,240 --> 01:46:13,120 And for the lady, what she did say isn't true. 1401 01:46:14,560 --> 01:46:14,820 Okay. 1402 01:46:15,360 --> 01:46:17,680 One of the other time. 1403 01:46:17,860 --> 01:46:18,020 Hang on. 1404 01:46:18,160 --> 01:46:18,960 The gentleman first. 1405 01:46:21,240 --> 01:46:24,020 Do you sound really swear? 1406 01:46:26,200 --> 01:46:27,460 Do you sound really swear? 1407 01:46:27,460 --> 01:46:30,460 The whole truth, the whole truth, and nothing but the truth, so hope you got it. 1408 01:46:30,620 --> 01:46:31,320 Yes, I did. 1409 01:46:31,840 --> 01:46:32,040 Okay. 1410 01:46:32,040 --> 01:46:32,220 Thank you. 1411 01:46:32,620 --> 01:46:33,480 Okay, Rachel, you're good. 1412 01:46:34,120 --> 01:46:39,320 Do you somewhat swear that what you said was the whole truth and nothing but the truth, 1413 01:46:39,400 --> 01:46:40,240 so hope you got it? 1414 01:46:40,380 --> 01:46:40,700 Thank you. 1415 01:46:41,120 --> 01:46:41,480 Thank you. 1416 01:46:41,980 --> 01:46:42,140 Sorry. 1417 01:46:42,340 --> 01:46:42,720 Okay. 1418 01:46:43,940 --> 01:46:49,040 Item one is just a comment on private streets. 1419 01:46:49,500 --> 01:46:55,460 We were a private street until just a few months ago, and we had snow removal for 1420 01:46:56,000 --> 01:46:56,660 all that time. 1421 01:46:56,660 --> 01:47:02,800 We moved in 1987, but we became a public street within the last few months. 1422 01:47:03,040 --> 01:47:05,440 I'm sorry, sir. Could you share your name and what street? 1423 01:47:06,520 --> 01:47:09,680 My name is Tom Sutterfield, and we live on Mary Meadows Lane. 1424 01:47:09,920 --> 01:47:10,140 Mary. 1425 01:47:10,380 --> 01:47:15,800 Okay. And so now we've become a public street, but we had snow removal all that time. 1426 01:47:16,380 --> 01:47:24,640 The other question that I had, there was a lot of discussion on sidewalks on both sides of these private streets. 1427 01:47:24,640 --> 01:47:33,060 How wide are the private streets supposed to be? I didn't catch that. Those were the two things I wanted to say. 1428 01:47:33,720 --> 01:47:34,280 Thank you. 1429 01:47:40,740 --> 01:47:44,400 Could you come up and answer how wide the street currently is? 1430 01:47:47,840 --> 01:47:48,880 They're 24 feet wide. 1431 01:47:49,260 --> 01:47:49,600 24. 1432 01:47:49,880 --> 01:47:50,180 Yes, ma'am. 1433 01:47:50,840 --> 01:47:51,200 Thank you. 1434 01:47:54,230 --> 01:48:04,390 And then, Jason, I know you flashed up. It looked like a grid of the tree plan, but I don't think I did. 1435 01:48:04,390 --> 01:48:07,250 That wasn't in our packet or it wasn't in our packet? 1436 01:48:07,410 --> 01:48:07,930 It was. 1437 01:48:08,750 --> 01:48:10,570 So just a couple things on that. 1438 01:48:10,770 --> 01:48:13,510 So one is related to lot 16. 1439 01:48:14,450 --> 01:48:18,310 They have submitted a landscape plan as well as a tree removal 1440 01:48:18,310 --> 01:48:23,630 and a tree removal plan just for lot 16. 1441 01:48:23,730 --> 01:48:24,870 So we reported on that. 1442 01:48:25,390 --> 01:48:27,350 And then as part of this process, 1443 01:48:27,350 --> 01:48:30,330 our objective is that as we move along Olia Village, 1444 01:48:30,510 --> 01:48:32,590 as the site gets developed over time, 1445 01:48:32,590 --> 01:48:37,090 we are updating that master tree preservation plan. 1446 01:48:37,730 --> 01:48:41,590 And so they have submitted that information as well so we can track it moving forward. 1447 01:48:42,310 --> 01:48:49,050 The Olio Village ordinance requires any removal above 50% to be replaced on a one-to-one basis 1448 01:48:49,050 --> 01:48:52,170 if they're a certain size, if they're 20 inches or more, 1449 01:48:52,210 --> 01:48:53,850 then it's two-to-one like I reported earlier. 1450 01:48:54,010 --> 01:48:57,390 So there's two different things going on, two different aspects of the tree. 1451 01:48:57,390 --> 01:49:03,970 But I think in the one that we saw today, we were only retaining 43 percent. 1452 01:49:05,490 --> 01:49:07,910 So I think 43 percent removal. 1453 01:49:08,130 --> 01:49:09,450 43 percent removal. 1454 01:49:11,010 --> 01:49:11,470 Correct. 1455 01:49:13,010 --> 01:49:14,150 For a lot, 16th. 1456 01:49:14,230 --> 01:49:15,110 For a lot, 16th. 1457 01:49:15,130 --> 01:49:15,270 Yes. 1458 01:49:15,490 --> 01:49:15,910 Thank you. 1459 01:49:22,200 --> 01:49:22,460 Okay. 1460 01:49:22,460 --> 01:49:29,800 Okay. Are we requesting a continuance? 1461 01:49:33,580 --> 01:49:36,500 How do you, yeah. Okay. 1462 01:49:40,370 --> 01:49:43,030 So can we have a, I guess the motion for a continuance? 1463 01:49:45,250 --> 01:49:50,150 I move to continue this meeting to end the meeting. 1464 01:49:50,150 --> 01:49:50,970 No, not the meeting. 1465 01:49:51,550 --> 01:49:59,070 I move to continue this public hearing to January 1 1466 01:50:03,290 --> 01:50:04,570 of Tuesday. 1467 01:50:05,970 --> 01:50:06,810 You can take it, Rachel. 1468 01:50:11,460 --> 01:50:12,240 So good. 1469 01:50:12,480 --> 01:50:12,820 Thank you. 1470 01:50:17,250 --> 01:50:18,250 All in favor? 1471 01:50:19,190 --> 01:50:19,890 All right. 1472 01:50:19,890 --> 01:50:20,250 May. 1473 01:50:22,370 --> 01:50:23,810 You got one, May. 1474 01:50:24,130 --> 01:50:24,710 Any other names? 1475 01:50:24,930 --> 01:50:25,130 No. 1476 01:50:25,510 --> 01:50:25,990 Two, Nice. 1477 01:50:27,450 --> 01:50:28,130 I will add. 1478 01:50:30,320 --> 01:50:30,360 So. 1479 01:50:31,400 --> 01:50:32,460 I'll take two. 1480 01:50:32,800 --> 01:50:33,440 I'll take two. 1481 01:50:33,620 --> 01:50:34,320 I'll take two. 1482 01:50:34,740 --> 01:50:35,200 I'll take two. 1483 01:50:35,200 --> 01:50:35,940 I'm track for you. 1484 01:50:36,480 --> 01:50:37,120 Thank you. 1485 01:50:38,740 --> 01:50:39,260 All right. 1486 01:50:39,400 --> 01:50:40,480 We are going to take a quick. 1487 01:50:41,480 --> 01:50:41,880 What? 1488 01:50:42,640 --> 01:50:42,660 Recent. 1489 01:50:42,980 --> 01:50:43,380 Recess. 1490 01:50:45,660 --> 01:50:48,960 I'm back at, do you want to say eight o'clock? 1491 01:50:49,680 --> 01:50:50,580 I think that sounds good. 1492 01:50:50,580 --> 01:50:56,520 Okay. Well, we'll reconvene at eight o'clock. So meeting adjourned at 7.52. Be back at eight. 1493 01:51:06,320 --> 01:51:10,560 And I'm very visible. 1494 01:51:13,400 --> 01:51:19,220 I mean, not yourself. I mean, I'm on the wrong side of the screen. 1495 01:51:19,840 --> 01:51:23,040 Well, yeah, I'm on the wrong side of the screen. 1496 01:51:23,940 --> 01:51:25,940 That's why you don't have to worry about anything. 1497 01:51:27,200 --> 01:51:28,700 You can do this laterally. 1498 01:51:28,820 --> 01:51:30,160 Don't you do these on the screen again? 1499 01:51:30,400 --> 01:51:34,860 I'm on the wrong side of the screen. 1500 01:51:34,860 --> 01:51:35,180 I'm on the wrong side of the screen. 1501 01:51:37,320 --> 01:51:40,540 I'm on the wrong side of the screen. 1502 01:51:40,540 --> 01:51:42,400 That was an unexplained bullet in the face. 1503 01:51:42,580 --> 01:51:43,460 I get it. 1504 01:51:43,540 --> 01:51:45,340 I don't care what you did. 1505 01:51:45,740 --> 01:51:47,320 I'm going to go on to see what you do. 1506 01:51:47,400 --> 01:51:47,560 Yes? 1507 01:51:48,620 --> 01:51:49,100 Both of them. 1508 01:51:49,380 --> 01:51:49,900 We got them together. 1509 01:51:50,080 --> 01:51:50,640 We got them from the hospital. 1510 01:51:51,680 --> 01:51:52,640 We got them from the hospital. 1511 01:51:52,640 --> 01:51:53,860 We're supposed to be solved. 1512 01:51:54,360 --> 01:51:54,660 That's right. 1513 01:51:54,860 --> 01:51:55,920 We got them from the hospital. 1514 01:51:55,960 --> 01:51:57,020 What do you get in collect? 1515 01:51:57,400 --> 01:51:57,800 I don't know. 1516 01:51:58,340 --> 01:51:58,980 I'm just going to say it. 1517 01:51:59,220 --> 01:51:59,700 This is for you. 1518 01:51:59,940 --> 01:52:00,400 It's for him. 1519 01:52:01,820 --> 01:52:02,760 That's how this is going to go. 1520 01:52:03,840 --> 01:52:05,140 So they're going to be rated, 1521 01:52:05,260 --> 01:52:06,680 and you're going to vote back to me. 1522 01:52:07,220 --> 01:52:08,620 I'm going to vote back. 1523 01:52:09,760 --> 01:52:10,620 He's a part of me. 1524 01:52:10,700 --> 01:52:13,120 I could give him a request. 1525 01:52:14,360 --> 01:52:16,000 I don't think that I'm a friend of mine. 1526 01:52:16,960 --> 01:52:18,400 You know, aside from the bank. 1527 01:52:18,720 --> 01:52:20,680 You can move in part of the sidewalk, 1528 01:52:21,520 --> 01:52:22,840 but he was the only thing he could do. 1529 01:52:23,260 --> 01:52:25,100 He said, well, you know, they should screen it at the bottom. 1530 01:52:27,780 --> 01:52:29,300 No, no, no, no. 1531 01:52:30,560 --> 01:52:32,240 It's a privilege that he holds to me. 1532 01:52:32,400 --> 01:52:33,620 I just want to be good against him. 1533 01:52:34,240 --> 01:52:34,980 He's built a process. 1534 01:53:07,240 --> 01:53:12,280 And then, like, again, she said, oh, I just want you to know, hold on. 1535 01:53:13,120 --> 01:53:13,480 Hold on. 1536 01:53:13,720 --> 01:53:15,480 Just a moment. 1537 01:53:16,460 --> 01:53:17,220 Just a moment. 1538 01:53:19,660 --> 01:53:20,740 I'm sure it's on purpose. 1539 01:53:22,140 --> 01:53:22,720 Yeah. 1540 01:53:23,040 --> 01:53:26,840 I mean, organizing on the freeing of the elections was kind of the case. 1541 01:53:27,880 --> 01:53:28,180 Right. 1542 01:53:31,300 --> 01:53:36,920 If they send me, if they don't give a bill, I'll work all in. 1543 01:53:37,400 --> 01:53:38,780 I think I'm going to remit other things. 1544 01:53:40,560 --> 01:53:41,120 See you then. 1545 01:53:41,240 --> 01:53:41,860 That's what you see. 1546 01:53:42,460 --> 01:53:43,240 You want to have to get it? 1547 01:53:43,620 --> 01:53:44,880 That makes sense, sir. 1548 01:53:45,160 --> 01:53:46,200 This is the government system. 1549 01:53:46,740 --> 01:53:47,560 We're on the dash of the day. 1550 01:53:47,640 --> 01:53:48,100 We're on out. 1551 01:53:48,580 --> 01:53:49,980 So be sure to send more of our air. 1552 01:53:52,700 --> 01:53:55,500 We're on the dash of the day. 1553 01:53:55,640 --> 01:53:58,160 We're on the dash of the day. 1554 01:54:11,090 --> 01:54:13,270 So you're quite as different than light. 1555 01:54:13,710 --> 01:54:18,250 Yeah, I'm just going to start with the light on. 1556 01:54:18,250 --> 01:54:25,870 Then I thought, if the numbers of it's something we're going to do, the system maybe isn't there, so we're actually not going to do it. 1557 01:54:26,330 --> 01:54:29,210 Because we're going to have so many to know, I mean, we should ask them. 1558 01:54:29,610 --> 01:54:30,070 Okay, 1559 01:54:32,960 --> 01:54:39,620 if you drive through Firmview, there's no sideline, but the minute you drive in far enough, 1560 01:54:39,780 --> 01:54:41,520 we fulfill a range of states around it. 1561 01:54:42,540 --> 01:54:51,040 Sidewalk stars. So you can see the newer 70 vision. They made a book. So the old women think back at 60s. 1562 01:54:52,520 --> 01:54:54,600 Now, everybody walks up the street. 1563 01:54:56,060 --> 01:54:57,000 Oh, I know. 1564 01:54:57,000 --> 01:54:58,560 No, it's not the... 1565 01:54:59,500 --> 01:55:01,200 I was making my... 1566 01:55:01,200 --> 01:55:02,100 We have to work it out. 1567 01:55:03,800 --> 01:55:05,440 No, we were actually... 1568 01:55:05,440 --> 01:55:07,000 She goes to the meet, just to make that interesting. 1569 01:55:08,060 --> 01:55:09,780 I was going to see a lot of people. 1570 01:55:10,340 --> 01:55:11,800 I was going to be more of a three. 1571 01:55:12,580 --> 01:55:13,400 That's what it was. 1572 01:55:13,520 --> 01:55:15,420 Smallers are starting to sound like... 1573 01:55:15,880 --> 01:55:16,320 Yeah. 1574 01:55:18,320 --> 01:55:18,560 Yeah. 1575 01:55:18,820 --> 01:55:20,540 Yeah, but it's a big one. 1576 01:55:21,320 --> 01:55:25,080 We're fortunate for the Supreme Court to be the one that we made our peace with them. 1577 01:55:26,260 --> 01:55:27,600 They're always full of courage. 1578 01:55:27,860 --> 01:55:28,920 It's a very sensitive job. 1579 01:55:29,600 --> 01:55:31,060 You want to be part of the Supreme Court? 1580 01:55:31,500 --> 01:55:31,640 No. 1581 01:55:31,920 --> 01:55:35,360 It's like, so they will take it really outside my house. 1582 01:55:35,580 --> 01:55:36,580 I think they've got it. 1583 01:55:37,160 --> 01:55:37,600 Thank you. 1584 01:55:40,360 --> 01:55:40,780 No problem. 1585 01:55:41,400 --> 01:55:41,800 I'm sorry. 1586 01:55:41,940 --> 01:55:42,360 They'll take it. 1587 01:55:42,640 --> 01:55:42,920 It's okay. 1588 01:55:42,920 --> 01:55:43,040 It's okay. 1589 01:55:43,520 --> 01:55:43,960 It's okay. 1590 01:55:43,960 --> 01:55:44,520 It's okay. 1591 01:56:45,900 --> 01:56:46,500 Yeah. 1592 01:56:46,700 --> 01:56:47,160 Oh sure. 1593 01:56:52,580 --> 01:56:53,180 Yeah. 1594 01:56:54,980 --> 01:56:59,320 That's the same thing I was able to do. 1595 01:57:01,600 --> 01:57:04,120 You can still take a break. 1596 01:57:05,140 --> 01:57:05,980 You can stop me. 1597 01:57:05,980 --> 01:57:07,360 They didn't say anything. 1598 01:57:08,640 --> 01:57:11,560 The old social, who's the person most of it recently, 1599 01:57:13,020 --> 01:57:15,180 who didn't say anything about Brown? 1600 01:57:15,620 --> 01:57:19,040 Which much of the orality and greater of the score? 1601 01:57:19,240 --> 01:57:23,200 I mean, the degree is more important than the definition. 1602 01:57:23,560 --> 01:57:26,620 One, two, which are under the 20th, so you make your choice. 1603 01:57:27,940 --> 01:57:30,140 Well, I didn't understand anything about that. 1604 01:57:30,340 --> 01:57:31,420 I didn't understand what you were talking about. 1605 01:57:31,420 --> 01:57:34,100 I know my mouth like you think is iron. 1606 01:57:34,580 --> 01:57:37,020 But it's equal to support. 1607 01:57:37,420 --> 01:57:39,960 They'll still may say something that's in the stream way. 1608 01:57:40,620 --> 01:57:42,400 The second thing is to barricade shield. 1609 01:57:43,060 --> 01:57:43,880 I just showed it's our aid. 1610 01:57:44,540 --> 01:57:50,100 I said, but like last time, we're taking a mistake in creating a screen. 1611 01:57:50,560 --> 01:57:54,740 We just started having to do a break production for the instrument. 1612 01:57:55,720 --> 01:57:56,240 I'm staying near that. 1613 01:57:56,900 --> 01:57:58,060 It's so cute. 1614 01:57:58,060 --> 01:58:01,980 The structure, let me feel it, wouldn't that sound like you're going to be propagandist? 1615 01:58:02,260 --> 01:58:03,500 I don't want to blame you for that. 1616 01:58:03,720 --> 01:58:04,080 It's yours. 1617 01:58:05,520 --> 01:58:05,960 It's yours. 1618 01:58:06,260 --> 01:58:06,560 It's mine. 1619 01:58:07,780 --> 01:58:08,400 It's mine. 1620 01:58:09,200 --> 01:58:09,620 It's mine. 1621 01:58:09,800 --> 01:58:10,020 It's mine. 1622 01:58:10,080 --> 01:58:10,400 It's mine. 1623 01:58:10,540 --> 01:58:10,680 It's mine. 1624 01:58:10,940 --> 01:58:11,580 It's mine. 1625 01:58:19,500 --> 01:58:20,120 It's mine. 1626 01:58:21,840 --> 01:58:22,520 It's mine. 1627 01:58:53,140 --> 01:58:54,580 I just did once. 1628 01:58:54,820 --> 01:58:55,460 Oh, that's okay. 1629 01:58:56,020 --> 01:58:58,440 And then, okay, we'll get it started again. 1630 01:58:59,980 --> 01:59:00,340 Okay. 1631 01:59:01,460 --> 01:59:03,420 There's, you're only with seven spotting, 1632 01:59:03,500 --> 01:59:04,820 who's got the direction? 1633 01:59:06,460 --> 01:59:07,820 You got three. 1634 01:59:08,360 --> 01:59:08,820 Yeah. 1635 01:59:09,780 --> 01:59:12,760 I thought we were getting back to order at 801, 1636 01:59:16,210 --> 01:59:22,110 and we'll open it with our public hearing application 1637 01:59:22,110 --> 01:59:30,350 application 25034 and 035, applications for rezoning from a GC general commercial district 1638 01:59:30,630 --> 01:59:36,830 to the Grazier Station PMD plan mixed use development district with a site concept plan 1639 01:59:36,830 --> 01:59:48,150 and site development plan for 11004, 110026, 11032, and 11056 Aula Boulevard and 825 1640 01:59:48,150 --> 01:59:50,130 and 827 Grazier Road. 1641 01:59:50,130 --> 01:59:57,410 And just as a reminder, we're going to have the presentations, and then we will open it up for comments. 1642 01:59:57,650 --> 01:59:59,790 Before we do that, I'll ask you to stand. 1643 02:00:00,000 --> 02:00:03,720 If you have turned your sheet in, that would be great. 1644 02:00:04,280 --> 02:00:08,860 And then the plan is to go until 9.30 tonight. 1645 02:00:09,480 --> 02:00:17,660 If we don't get to everything, we will be continuing the discussion at our next meeting, which was January 20th. 1646 02:00:20,540 --> 02:00:27,700 So if anyone speaking tonight could come forward to be sworn in. 1647 02:00:34,290 --> 02:00:38,050 Yeah, anyone that has a card, if you want to go ahead and stand up and be sworn in. 1648 02:00:43,720 --> 02:00:49,160 Do you solemnly swear to tell the truth, the whole truth, and nothing but the truth, so how do you got it? 1649 02:00:49,580 --> 02:00:51,160 Thank you. 1650 02:01:17,240 --> 02:01:22,160 Good evening, members of the Planning and Zoning Commission. Jason Jaggi, Director of Community Development. 1651 02:01:22,680 --> 02:01:30,580 Just a couple of introductory remarks and then I think, as you mentioned, the applicant's going to give their presentation and then the staff will do so as well. 1652 02:01:30,580 --> 02:01:34,240 So just as a little bit of background information on this application. 1653 02:01:34,820 --> 02:01:41,740 So the first time it came before the commission was in conceptual form back in August 4, 2025. 1654 02:01:42,700 --> 02:01:47,600 Since then, adjustments have been made to the proposal based on feedback received. 1655 02:01:48,320 --> 02:01:50,500 The applicant has also held a neighborhood meeting. 1656 02:01:51,240 --> 02:01:58,100 The traffic study has been completed since that time, as well as the shared parking study by the applicant's consulting engineer. 1657 02:01:58,100 --> 02:02:08,020 So if you recall, none of that information really was available, but it wasn't expected because it was a conceptual review just to introduce it and provide some initial feedback. 1658 02:02:08,560 --> 02:02:18,940 But I can report that all of that work has now been done and the applicant has submitted these applications for formal consideration by the Planning and Zoning Commission. 1659 02:02:20,060 --> 02:02:26,980 So tonight's objectives in talking with the applicant, you know, in my recommendation and thoughts tonight are, 1660 02:02:27,320 --> 02:02:32,520 one, is I think, you know, a clear understanding of the submitted development proposal is what you're after tonight, 1661 02:02:32,720 --> 02:02:35,320 understanding the project, all aspects of it. 1662 02:02:36,360 --> 02:02:38,740 Reviewing the planning and zoning district requirements. 1663 02:02:38,960 --> 02:02:41,500 So this is a rezoning to a planned development district. 1664 02:02:42,000 --> 02:02:46,860 So basically what that means is it's taking the property out of the traditional zoning code structure, 1665 02:02:46,860 --> 02:02:53,580 and it's placing it into a customized zoning district that's based on the site plan, the 1666 02:02:53,580 --> 02:02:59,520 site, you know, the site plan and any conditions related to that in terms of regulation and 1667 02:02:59,520 --> 02:03:00,900 SIS parking, what have you. 1668 02:03:01,060 --> 02:03:05,860 So this project has to stand on its own merits and it will basically have its own zoning 1669 02:03:05,860 --> 02:03:11,140 district that reflects the plan that is being submitted, should it be approved. 1670 02:03:12,860 --> 02:03:19,500 Like I said, we'll also look at the traffic impact study. Our consulting traffic engineer, Mr. Dan Shane, is here as well. 1671 02:03:19,640 --> 02:03:27,280 Should you have questions about the traffic impact study? And then the shared parking study that was performed by the applicant's consulting engineer. 1672 02:03:27,620 --> 02:03:35,280 So I also want to just kind of conclude my remarks that, you know, there's been a lot of discussion, a lot of work put into this application. 1673 02:03:35,700 --> 02:03:40,740 There's a lot to review tonight and understand that there's a meeting we'll end at 9.30. 1674 02:03:41,240 --> 02:03:43,080 And then, you know, we'll see how things go. 1675 02:03:43,240 --> 02:03:45,880 But there is no request for any approval tonight. 1676 02:03:46,040 --> 02:03:46,980 There's no draft ordinance. 1677 02:03:47,140 --> 02:03:48,240 There's no motion to approve. 1678 02:03:48,300 --> 02:03:51,240 And I just wanted to be clear that that's not the objective tonight. 1679 02:03:51,440 --> 02:03:54,520 So with that, I'll turn it over to the applicant to make their presentation. 1680 02:03:55,240 --> 02:03:55,740 We'll go from there. 1681 02:03:55,820 --> 02:03:56,040 Thank you. 1682 02:04:06,470 --> 02:04:07,950 Good evening, commissioners. 1683 02:04:09,030 --> 02:04:10,090 I'm at while she's pulling that up. 1684 02:04:10,170 --> 02:04:11,530 I can go ahead and just introduce myself. 1685 02:04:12,050 --> 02:04:13,130 I'm Cecilia Dvorak. 1686 02:04:13,130 --> 02:04:17,750 I am managing principal at Steadfast City, economic and community partners. 1687 02:04:18,610 --> 02:04:23,410 I am representing the development team tonight with the initial presentation. 1688 02:04:24,170 --> 02:04:27,830 You all probably don't recognize me the last time we presented to you. 1689 02:04:28,110 --> 02:04:29,450 You met with Joel Blaskock. 1690 02:04:29,890 --> 02:04:33,210 I am happy to report that he just welcomed his second baby, 1691 02:04:33,210 --> 02:04:38,270 and so he's happy at home cuddling the newborn for the next few weeks. 1692 02:04:38,410 --> 02:04:39,690 So I'm here instead. 1693 02:04:40,350 --> 02:04:41,690 Hope you will bear with me. 1694 02:04:42,610 --> 02:04:46,510 But I think we just kind of want to give you an initial overview tonight. 1695 02:04:46,870 --> 02:04:50,510 Again, not going to cover it too in depth because I know Jason just covered some of it. 1696 02:04:50,590 --> 02:04:55,390 But the project history highlighting some of the major features of the project, 1697 02:04:55,750 --> 02:05:00,650 and then we'll also cover how the project has evolved with the community input 1698 02:05:00,650 --> 02:05:07,430 and how it is being addressed by the comprehensive plan and how it fits within that context. 1699 02:05:08,630 --> 02:05:14,970 After I finish up my remarks, I will also open it up to Gary, who is the applicant and 1700 02:05:14,970 --> 02:05:19,510 the developer, and he can provide you some context and a little bit about his background. 1701 02:05:20,110 --> 02:05:26,190 And then we can also bring up here Julie to walk through the parking demand study so 1702 02:05:26,190 --> 02:05:28,950 that you guys can get a better understanding of what that entails. 1703 02:05:29,690 --> 02:05:31,870 And then we can obviously take Q&A. 1704 02:05:31,870 --> 02:05:36,670 There's other people here as well to support the project who have been sworn in. 1705 02:05:37,710 --> 02:05:40,990 Kent with HDA is the architect on the project. 1706 02:05:41,650 --> 02:05:45,950 Rich Sharp is with Crime Consulting and is the engineer on the project. 1707 02:05:46,990 --> 02:05:50,810 And Dan Shane is the city's engineer on the traffic impact study. 1708 02:05:51,010 --> 02:05:57,150 So hopefully to cover all of the bases and bring up people who are specialized in your specific questions as we go. 1709 02:05:58,850 --> 02:06:05,290 So, again, just showing kind of the timeline of what we have done since the inception of this project. 1710 02:06:05,770 --> 02:06:10,210 We did initially start this project with the city staff in April of this year. 1711 02:06:10,510 --> 02:06:14,390 And since then we've done two community meetings outside of the official process. 1712 02:06:14,990 --> 02:06:19,210 We did one preliminary planning and zoning meeting ahead of the application. 1713 02:06:19,210 --> 02:06:27,570 And so this is our second time before you, but this is the first time before you as a part of the sort of official application, if you will. 1714 02:06:28,350 --> 02:06:39,330 We've also engaged with the city's traffic engineer and as part of the process. And so this timeline just iterates for you kind of what we've done through what we've done to date. 1715 02:06:39,470 --> 02:06:43,130 And I'll kind of walk you through that a little bit step by step, just so you can see the evolution of the project. 1716 02:06:43,130 --> 02:06:48,450 In April of 2025, we presented the initial concept to staff. 1717 02:06:48,830 --> 02:06:53,010 The application at that time presented 172 units across two buildings 1718 02:06:53,010 --> 02:06:56,170 with some first floor commercial retail space. 1719 02:06:56,830 --> 02:07:02,450 And then we got some feedback from them and made some adjustments to the plans 1720 02:07:02,450 --> 02:07:06,430 and came back with the conceptual plans that you all saw 1721 02:07:06,430 --> 02:07:09,450 and the community saw back in July and August of this year. 1722 02:07:09,450 --> 02:07:16,030 That plan at the time was 168 units across a single mixed use building. 1723 02:07:16,710 --> 02:07:20,270 We did at that time also receive a lot of community feedback. 1724 02:07:20,570 --> 02:07:25,070 And we have taken a lot of time to look at the feedback, look at the data, 1725 02:07:25,470 --> 02:07:29,310 do the analysis, and make adjustments to the plans that we hope will be, 1726 02:07:29,310 --> 02:07:32,510 you know, well received by the commission and the community, 1727 02:07:32,950 --> 02:07:35,610 but recognize that there's still some discussion to be had. 1728 02:07:36,920 --> 02:07:40,360 And this is the proposal that we see today. 1729 02:07:40,980 --> 02:07:45,460 It shows 157 units across still a single building, 1730 02:07:45,720 --> 02:07:48,020 but we have made some adjustments and tweaks. 1731 02:07:48,320 --> 02:07:52,160 We have pulled the building back from Grazier to meet the same setbacks 1732 02:07:52,160 --> 02:07:57,280 as any other commercial zoning district that would if they came before you 1733 02:07:57,280 --> 02:07:58,300 under the underlying zoning. 1734 02:07:59,360 --> 02:08:03,180 We have also further pulled the building away from the residential neighborhood 1735 02:08:03,180 --> 02:08:08,320 in order to create a more continuous space for the single-family residential transition. 1736 02:08:09,020 --> 02:08:12,260 And I'll walk you through some of the project features and elements, 1737 02:08:12,620 --> 02:08:16,740 and then we'll talk about the comprehensive plan and go through some of that community feedback 1738 02:08:16,740 --> 02:08:18,980 so you can see the specific changes we made. 1739 02:08:21,780 --> 02:08:22,840 So project features. 1740 02:08:25,000 --> 02:08:32,740 We have envisioned this as a mixed-use, high-quality development located at Olive and Grazier. 1741 02:08:32,740 --> 02:08:41,260 It includes ground level commercial retail space, 157 apartments, and very high quality 1742 02:08:41,260 --> 02:08:48,020 materials and high quality design with a lot of facade articulation and just a lot of care 1743 02:08:48,020 --> 02:08:49,320 made into the design. 1744 02:08:49,500 --> 02:08:53,680 I will say that is one thing that we have seen positive remarks on, so definitely hoping 1745 02:08:53,680 --> 02:08:55,140 to lean on that as a positive. 1746 02:08:56,080 --> 02:09:01,540 The architectural design is intended to be respectful, as I said, of the low density 1747 02:09:01,540 --> 02:09:08,300 neighborhood at the rear with a step down of the building. We have also provided a full 35 foot 1748 02:09:08,300 --> 02:09:10,300 buffer which we'll see more specifically later. 1749 02:09:13,780 --> 02:09:17,780 The Plaza provides a public facing corner with 1750 02:09:17,780 --> 02:09:24,760 seating and buffering plant material with a future art space as well as seating for the 1751 02:09:24,760 --> 02:09:26,200 residents and visitors alike. 1752 02:09:29,200 --> 02:09:35,260 We also have now a covered pass through for the building so that 1753 02:09:35,260 --> 02:09:40,980 folks can enter and exit both sides of the building as a pedestrian and create 1754 02:09:40,980 --> 02:09:43,200 some continuity from one side to the other. 1755 02:09:46,070 --> 02:09:47,870 That's a rendering view of the 1756 02:09:47,870 --> 02:09:48,390 pass-through. 1757 02:09:51,610 --> 02:09:56,170 We've also provided a separate and fully enclosed commercial 1758 02:09:56,170 --> 02:10:01,310 trash receptacle and a separate residential trash room within the 1759 02:10:01,310 --> 02:10:03,690 actual building itself for the residential units. 1760 02:10:08,740 --> 02:10:10,380 And then we have 1761 02:10:10,380 --> 02:10:16,080 added a number of trees in the parking lot to be broken up with five-foot tree 1762 02:10:16,080 --> 02:10:22,300 wells so that the hardscape can be broken up at the rear and soften the rear of 1763 02:10:22,300 --> 02:10:26,000 the building as people are engaging with the parking lot. 1764 02:10:28,080 --> 02:10:29,520 And then that's an 1765 02:10:29,520 --> 02:10:33,400 example of kind of what a tree well would look like but the ones we're 1766 02:10:33,400 --> 02:10:34,220 proposing are round. 1767 02:10:38,430 --> 02:10:42,590 We also are providing four EV parking stalls and 1768 02:10:42,590 --> 02:10:50,510 eight EV ready parking stalls for further EV expansion as the development continues to evolve. 1769 02:10:53,470 --> 02:10:58,430 Well that did not translate well but along the south there is 1770 02:10:59,980 --> 02:11:09,990 a buffer that is at least 35 feet along the entire south edge of the development and then 1771 02:11:09,990 --> 02:11:17,010 And there is a significant amount of the property that is going above and beyond that 35 foot landscape buffer as well. 1772 02:11:22,120 --> 02:11:31,320 We have included a number of very popular must have high quality amenities for the residents to engage residents in a way 1773 02:11:31,320 --> 02:11:35,220 that attracts them as long term residents rather than a high turnover. 1774 02:11:35,220 --> 02:11:57,160 This includes a game area, a gym, a business center, separate reception and mail area for deliveries at the front, a coffee bar and a lounge near the outdoor seating and plaza, and private tenant storage areas as well and a separately kept trash room. 1775 02:11:57,160 --> 02:12:07,100 Additionally, we have a fenced dog park and pool that are placed away from the 1776 02:12:07,100 --> 02:12:13,000 building so that it can be outside of the shadows of the building, but also 1777 02:12:13,000 --> 02:12:16,260 being very mindful of the residential buffer that's present. 1778 02:12:18,100 --> 02:12:21,620 That is a rendering of the pool as well. 1779 02:12:25,860 --> 02:12:30,020 We have provided a dense and varied landscape plan and all landscaping 1780 02:12:30,020 --> 02:12:34,220 areas have irrigation to ensure longevity and maximum growth. 1781 02:12:37,660 --> 02:12:44,340 Again, that highlight isn't working the way I wanted it to, but we do have a future proposed 1782 02:12:44,960 --> 02:12:52,320 cross access so that at the time which the property to the west is being redeveloped, 1783 02:12:52,640 --> 02:12:57,840 they have an established cross access throughout the development as well. 1784 02:13:02,640 --> 02:13:05,360 I can go ahead and cover now just the comprehensive plan. 1785 02:13:06,020 --> 02:13:11,580 And then, again, we'll go through the community feedback and sort of what changes have been made in response. 1786 02:13:12,220 --> 02:13:14,880 And then I'll hand it over to Gary and Julie from there. 1787 02:13:14,940 --> 02:13:16,180 So just walking you along. 1788 02:13:17,340 --> 02:13:21,440 So the site is located in the East Olive corridor of the Comprehensive Plan. 1789 02:13:22,200 --> 02:13:27,340 As you can see here, it sits at the corner of Olive and Grazier and is surrounded by Olive on the north, 1790 02:13:27,340 --> 02:13:32,480 which is designated as a primary street and Grazier on the east, which is also 1791 02:13:32,480 --> 02:13:37,920 designated in the comprehensive plan as a primary street. Just to kind of walk you 1792 02:13:37,920 --> 02:13:43,760 through what we see as we go around on the north, we have a commercial 1793 02:13:44,340 --> 02:13:52,500 properties across Olive and the eastern most, which is a project that has 1794 02:13:52,500 --> 02:13:56,520 setbacks that are very urban, similar to the ones that are being proposed 1795 02:13:56,520 --> 02:13:57,540 proposed in this project. 1796 02:13:59,670 --> 02:14:03,590 To the east is the existing credit union across Grazier. 1797 02:14:07,260 --> 02:14:10,500 To the south is the residential single-family neighborhood. 1798 02:14:11,400 --> 02:14:17,720 Here you see from the southeast, which also slopes to a lower grade from the subject site. 1799 02:14:24,020 --> 02:14:29,460 This is actually a view from the development itself, looking southwest, 1800 02:14:30,060 --> 02:14:32,300 so that you can see what it currently sits like today. 1801 02:14:32,300 --> 02:14:40,560 There is a significant slope and the parking lot has their commercial trash enclosures there as well. 1802 02:14:45,940 --> 02:14:52,860 To the west you can see the adjacent retail building and kind of where it sits in proximity to the existing development as well. 1803 02:14:56,200 --> 02:14:58,340 So as it relates to the comprehensive plan fit, 1804 02:14:58,340 --> 02:14:59,880 the comprehensive 1805 02:15:00,000 --> 02:15:17,540 The plan talks about the East Olive corridor as a walkable corridor of destinations with a wide mix of uses that encourages pedestrian access from adjacent neighborhoods and prioritizes walkability between neighboring lots while still accommodating the car access. 1806 02:15:18,440 --> 02:15:36,960 In addition to being in the East Olive corridor, the site is designated as being in the neighborhood commercial or NC district type, place type, which supports medium to low density commercial, retail, office, neighborhood, service businesses, and residential development. 1807 02:15:37,800 --> 02:15:46,440 So there's been a lot of questions and discussion about density, so there's a few different ways that we'd like to break it down and just look at for consideration. 1808 02:15:46,440 --> 02:15:49,540 First is the number of stories. 1809 02:15:50,420 --> 02:15:56,920 The area is intended to serve as a transition between more intense commercial districts to the east and west, 1810 02:15:57,320 --> 02:16:03,420 and the plan intends to allow for lot-by-lot redevelopment that builds towards that coherent corridor identity. 1811 02:16:04,280 --> 02:16:15,120 The proposed development complies with that as this is just to the east of the nest building and the office building at 10845. 1812 02:16:15,960 --> 02:16:28,720 Those are over here, and those both rise to three and four stories and are located in the same comprehensive plan NC district and the corridor, all of East corridor as well. 1813 02:16:28,920 --> 02:16:41,580 And then to the west, the office building here sits just outside of the all of East corridor in the mixed-use district and is six stories. 1814 02:16:41,580 --> 02:16:49,280 So the proposed development aims to really provide that transition to the two to four stories. 1815 02:16:49,780 --> 02:16:55,760 And we are understanding that we need to be respectful of the adjacent residents on the other transition to the south. 1816 02:16:56,140 --> 02:17:02,980 So that step back is really intended to provide that sort of respectful glide to the residential to the south. 1817 02:17:06,050 --> 02:17:14,870 Additionally, the comprehensive plan provides some written guidance as well as visual guidance for the reader. 1818 02:17:15,590 --> 02:17:23,050 And the comprehensive plan has a number of images as examples for that vision and best practices for character and the corridor of the NC district. 1819 02:17:23,670 --> 02:17:32,190 So one of those images points to the Demune point development in Clayton, which is similar, has proposed development of commercial on the first floor 1820 02:17:32,190 --> 02:17:34,530 and residential above with a total of 40. 1821 02:17:37,160 --> 02:17:43,750 So at 157 units, another way to look at this is dwelling units per acre. 1822 02:17:45,160 --> 02:17:50,390 As proposed, the Grazer Station is approximately 36 units per acre. 1823 02:17:51,050 --> 02:17:56,110 Comparable projects like the Nest, the View, Vanguard Heights, King's Landing, and the 1824 02:17:56,110 --> 02:18:01,530 Oliver, this project sits roughly in the middle of those comparable projects as 1825 02:18:01,530 --> 02:18:03,190 as far as dwelling units per acre goes. 1826 02:18:07,300 --> 02:18:13,940 In addition to looking at this from the perspective of units per acre, we like to look at this 1827 02:18:13,940 --> 02:18:16,460 from the perspective of beds per acre comparison. 1828 02:18:17,580 --> 02:18:24,460 This is a good way to assess how it actually provides the number of people who will be 1829 02:18:24,460 --> 02:18:31,080 present on the site on a regular basis based on the occupancy of the building. 1830 02:18:31,080 --> 02:18:42,420 So this demonstrates that the project's residential intensity is actually of the same comparable projects the lowest density of those nearby multifamily properties. 1831 02:18:42,760 --> 02:18:51,740 So it is about 36.9 beds per acre, whereas the others range from 38.1 to 100. 1832 02:18:52,260 --> 02:18:56,160 So they have much higher bedroom counts than this one being proposed. 1833 02:18:56,160 --> 02:18:57,360 To 1834 02:19:00,980 --> 02:19:13,860 further demonstrate the consistency with the comprehensive plan and the east olive corridor vision, we can look at the plan's guidance for frontage treatment and site design as well as neighborhood transitions and multimodal connectivity. 1835 02:19:14,240 --> 02:19:22,360 So the primary frontage, as I said earlier, along olive reinforces a pedestrian oriented mixed use corridor. 1836 02:19:22,920 --> 02:19:27,440 We're showing consistent urban setbacks that define the street edge. 1837 02:19:27,440 --> 02:19:31,380 We have entrances that are oriented to the sidewalks. 1838 02:19:31,380 --> 02:19:35,360 We are strengthening the relationship between the building and the public realm with that. 1839 02:19:36,100 --> 02:19:40,620 We also have parking located primarily at the rear, 1840 02:19:40,880 --> 02:19:49,240 ensuring that all of remains walkable but also visually cohesive to the rest of the development along the corridor. 1841 02:19:49,240 --> 02:19:49,380 corridor. 1842 02:19:50,440 --> 02:19:55,900 We also have provided an activated corner plaza with seeding, shade trees, and opportunities 1843 02:19:55,900 --> 02:19:56,940 for outdoor dining. 1844 02:19:57,640 --> 02:20:04,560 And the commercial restaurant frontage opens directly to the outdoor pass through, creating 1845 02:20:04,560 --> 02:20:09,780 a natural extension of indoor activity and really encouraging the activation of the 1846 02:20:09,780 --> 02:20:10,940 outdoor space at large. 1847 02:20:11,960 --> 02:20:17,140 So these elements create a comfortable connected frontage consistent with the east olive 1848 02:20:17,140 --> 02:20:23,540 board or recommendations and the comprehensive plan designates Grazier as a primary street as 1849 02:20:23,540 --> 02:20:27,860 well but we have decided to make some slight adjustments to ensure that we're being respectful 1850 02:20:27,860 --> 02:20:34,440 of the adjacent residents that really want to make sure that it's congruent with their 1851 02:20:35,320 --> 02:20:42,360 neighborhood. So along Grazier the emphasis does shift toward the neighborhood compatibility. 1852 02:20:42,360 --> 02:20:52,780 We are providing a deeper setback than we had previously proposed, one that is consistent with the commercial zoning district of at least 10 feet to the property line. 1853 02:20:53,180 --> 02:21:12,340 But I would note that the sidewalk and the sort of narrow landscape strip that are at the edge of the street actually create a setback from the curb to 17.5 feet at the minimum and 19.5 at the most southern edge. 1854 02:21:12,340 --> 02:21:21,040 of the building. Additionally, the 10-foot setback from the property line between the 1855 02:21:21,040 --> 02:21:25,920 sidewalk and the building does allow for a more dense vegetated area so that it can 1856 02:21:25,920 --> 02:21:31,460 be a pleasant walk from the neighborhood up to the commercial and mixed use building. 1857 02:21:35,260 --> 02:21:40,320 We have ensured a continuous pedestrian connectivity that extends along Grazier into the plaza 1858 02:21:40,320 --> 02:21:44,000 and all of the amenities that are being provided along the frontage. 1859 02:21:44,700 --> 02:21:50,200 And as I previously mentioned, we do have that buffer, again, along the southern edge. 1860 02:21:50,560 --> 02:21:55,560 So the entire building has been shifted in a couple of different directions 1861 02:21:55,560 --> 02:21:57,940 to make sure that that gives enough room. 1862 02:22:02,210 --> 02:22:06,650 The proposed development also supports safe, efficient circulation through coordinated access 1863 02:22:06,650 --> 02:22:10,270 on olive as well as grazer, including curb cut consolidation. 1864 02:22:10,270 --> 02:22:16,230 At the moment there are three curb cuts along these two sites or these few sites. 1865 02:22:16,970 --> 02:22:19,630 So we are consolidating those to two. 1866 02:22:20,010 --> 02:22:25,510 Additionally, it proposes a clear internal pedestrian network that includes the covered 1867 02:22:25,510 --> 02:22:29,390 pass-through for folks who might park in the rear of the building and look to use the 1868 02:22:29,390 --> 02:22:31,150 commercial on the frontage. 1869 02:22:32,210 --> 02:22:36,930 And then we also are improving walkability via a new sidewalk along 1870 02:22:36,930 --> 02:22:40,390 which currently is not present. 1871 02:22:43,100 --> 02:22:48,340 We are also enhancing the frontage treatments that are appropriate for their context, 1872 02:22:48,480 --> 02:22:53,680 given the site transition from the commercial olive at the front to the residential at the rear. 1873 02:22:54,320 --> 02:22:58,500 The mixed-use project with a high-quality design and with pedestrian amenities reinforces 1874 02:22:59,060 --> 02:23:03,960 the east olive corridor as a pedestrian-friendly reinvestment area for grid 4. 1875 02:23:06,700 --> 02:23:10,640 So for the community feedback, again, I'll go last through the community feedback, 1876 02:23:10,840 --> 02:23:15,900 and then I'll hand it over to the developer and applicant, Gary Hasenflu, 1877 02:23:16,260 --> 02:23:20,400 who can speak a little bit to his experience, and then we'll go through the parking demand study. 1878 02:23:21,080 --> 02:23:25,340 So through the multiple engagement sessions between the development team and the residents, 1879 02:23:25,540 --> 02:23:30,360 as well as the commissioners, we've heard a lot of emphasis of various priorities 1880 02:23:30,360 --> 02:23:33,960 that really allowed us to review and revise the development plans. 1881 02:23:33,960 --> 02:23:49,420 So we heard a desire to see a more comfortable landscape area, improved building placement, enhanced landscaping and screening along the south property, and a concern for the density, particularly as it relates to traffic and parking considerations. 1882 02:23:50,340 --> 02:23:55,840 So each of these points has been integrated into the revised plans and or addressed through various studies. 1883 02:23:55,840 --> 02:23:56,940 In 1884 02:23:59,140 --> 02:24:02,000 response to the community feedback for the plaza design, 1885 02:24:02,580 --> 02:24:05,700 we are now including enhanced landscaping, shade trees, 1886 02:24:06,360 --> 02:24:08,820 layered planting to buffer all of Boulevard, 1887 02:24:09,340 --> 02:24:12,900 and a central focal area to include a future art installation, 1888 02:24:13,220 --> 02:24:15,080 and a comfortable seating area as well, 1889 02:24:15,520 --> 02:24:17,260 shielded by the vegetation from the traffic. 1890 02:24:17,900 --> 02:24:22,480 The restaurant frontage opens directly onto the open pass through, 1891 02:24:22,640 --> 02:24:26,120 which we saw earlier, and encourages outward dining 1892 02:24:26,120 --> 02:24:31,340 and spillover activity into the plaza to consistently activate the space. 1893 02:24:33,100 --> 02:24:38,560 And just to be clear, this is the previously proposed one that you all saw, 1894 02:24:38,780 --> 02:24:43,400 and this is the updated one that's being reviewed this evening. 1895 02:24:46,370 --> 02:24:53,590 With regard to building circulation, key revisions have been made to include the covered pedestrian pass-through 1896 02:24:53,590 --> 02:24:58,130 that's linking the rear parking area with olive both visually and actively. 1897 02:25:02,110 --> 02:25:07,050 The building subbacks, we have provided deeper building subbacks along Grazier to increase 1898 02:25:07,050 --> 02:25:10,710 privacy and provide a software aesthetic transition to the residential neighborhood. 1899 02:25:12,690 --> 02:25:19,410 We've also removed a number of the sacks to essentially shift the building further 1900 02:25:19,410 --> 02:25:20,930 north and 1901 02:25:27,240 --> 02:25:28,920 the residential neighborhood to the south. 1902 02:25:28,920 --> 02:25:35,720 You'll see with landscaping and screening, residents expressed concern about the privacy 1903 02:25:35,720 --> 02:25:40,640 and the southern edge of the building in response the design has been adjusted with additional 1904 02:25:40,640 --> 02:25:43,680 layered screening of trees and shrubs and ground cover. 1905 02:25:44,240 --> 02:25:49,460 Certainly we're open to additional changes if the commission has specific feedback on this 1906 02:25:49,460 --> 02:25:53,820 which could include more opaque fencing along some of the amenities. 1907 02:25:53,820 --> 02:25:59,100 But we do see the importance of the established 35-foot buffer for the neighboring residents. 1908 02:25:59,480 --> 02:26:04,740 And we have exceeded that when and where possible while still ensuring that the amenities are 1909 02:26:04,740 --> 02:26:08,340 needed and that the parking remains intact to serve the entire development. 1910 02:26:12,510 --> 02:26:17,050 With regard to the density of the development, we heard a lot of concerns related to adequate parking 1911 02:26:17,050 --> 02:26:19,470 and additional potential traffic generation. 1912 02:26:20,270 --> 02:26:23,470 We'll talk about that a little bit in more detail later. 1913 02:26:24,950 --> 02:26:30,050 Sorry, this is another rendering that is of the wall a little bit further south so you 1914 02:26:30,050 --> 02:26:34,050 can see how the elevation changes from one side to the other. 1915 02:26:35,070 --> 02:26:42,350 But with regard to the density of the development, the developer has hired a transportation engineering 1916 02:26:42,350 --> 02:26:42,910 company. 1917 02:26:43,610 --> 02:26:48,730 Julie Nolfo is here from Lockmular Group who will walk us through the specifics 1918 02:26:48,730 --> 02:26:50,790 of her analysis and her findings. 1919 02:26:50,790 --> 02:27:10,230 But overall, while the project's residential density falls within the medium density range, the parking demand analysis confirms that this level of density in addition to the commercial uses are fully supported by the parking supply on site with an hour by hour demand well below the private capacity. 1920 02:27:11,230 --> 02:27:17,670 In addition to parking, we also heard concerns about traffic generated and the potential impacts on the surrounding roadways. 1921 02:27:18,170 --> 02:27:28,130 And we have been working with HR Green, the city's consultant, on that analysis and the report that we received showed that there were no recommended changes. 1922 02:27:29,490 --> 02:27:34,290 We understand specific concerns have been raised regarding the westbound left traffic. 1923 02:27:34,290 --> 02:27:46,550 I'm not sure if we were planning to talk about that today specifically, but from MODOT, and we're prepared to take direction on that to ensure that the entrances and exits are safe for all users. 1924 02:27:51,350 --> 02:28:04,850 Additionally, we have had a few reoccurring questions from the nearby neighborhood related to the location of certain site amenities, day-to-day operations, and potential neighborhood impacts. 1925 02:28:04,850 --> 02:28:10,890 So with respect to the pool and dog park, these amenities are intentionally located toward the perimeter of the site 1926 02:28:10,890 --> 02:28:17,830 so, again, that they can receive adequate sunlight throughout the day and placing them closer to the building would result in significant 1927 02:28:17,830 --> 02:28:21,670 shadowing for much of the day and reduce their overall usability. 1928 02:28:22,390 --> 02:28:28,930 Additionally, it would remove the benefit of having the tuck under parking areas to ensure that these amenities can remain both 1929 02:28:28,930 --> 02:28:30,830 compatible and respectful of the 1930 02:28:30,830 --> 02:28:32,370 nearby homes, they were 1931 02:28:32,370 --> 02:28:34,010 buffered with the landscape 1932 02:28:34,010 --> 02:28:36,430 buffer and the fencing, and the 1933 02:28:36,430 --> 02:28:37,830 property owner is also amenable 1934 02:28:37,830 --> 02:28:39,930 to reasonable limitations of 1935 02:28:39,930 --> 02:28:42,550 hours and noise to ensure that 1936 02:28:42,550 --> 02:28:43,770 they can function as a good 1937 02:28:43,770 --> 02:28:44,670 neighbor as well. 1938 02:28:45,630 --> 02:28:46,550 We've also heard questions 1939 02:28:46,550 --> 02:28:47,930 regarding trash management. 1940 02:28:48,750 --> 02:28:50,350 So to minimize the potential 1941 02:28:50,350 --> 02:28:52,510 impacts related to the odor 1942 02:28:52,510 --> 02:28:54,790 and visibility, all residential 1943 02:28:54,790 --> 02:28:56,050 trash and recycling will be 1944 02:28:56,050 --> 02:28:57,510 handled within a dedicated 1945 02:28:57,510 --> 02:28:59,790 trash room inside the building itself. 1946 02:29:00,470 --> 02:29:04,490 And then the commercial tenants will utilize a fully enclosed masonry trash 1947 02:29:04,490 --> 02:29:08,610 enclosure on the west side, which will be screened with landscaping and 1948 02:29:08,610 --> 02:29:12,450 intentionally positioned away from the adjacent residential properties as much 1949 02:29:12,450 --> 02:29:12,990 as possible. 1950 02:29:13,890 --> 02:29:17,430 So while trash service exists in a similar general location today, 1951 02:29:17,690 --> 02:29:21,790 our goal is to improve that and make it, you know, 1952 02:29:22,070 --> 02:29:24,910 an insurance not a nuisance for the adjacent residents. 1953 02:29:26,630 --> 02:29:36,710 Finally, we have received questions related to the potential school impacts based on the proposed unit mix, which is heavily weighted towards studios and one-bedrooms. 1954 02:29:37,170 --> 02:29:42,610 The anticipated number of school-aged children generated by a project like this really is expected to be very minimal. 1955 02:29:43,230 --> 02:29:51,410 So this is consistent with data for similar mixed-use project developments, which typically attract really young professionals, couples sometimes, 1956 02:29:51,410 --> 02:29:55,910 and downsizing households rather than families with children just because they 1957 02:29:55,910 --> 02:29:59,790 don't really have the room for it. As such the project isn't expected. 1958 02:30:10,120 --> 02:30:18,480 So I think I've covered quite a bit here. I know that's a lot to address. So obviously, if we can revisit anything and make anything more clear, we're happy to do so. 1959 02:30:18,980 --> 02:30:29,980 I am going to pass it over to Gary Hassin, who though he is the developer and the applicant who can discuss the project's vision, his commitments, and then we'll hear from Julie to talk through the parking lot. 1960 02:30:29,980 --> 02:30:32,220 I appreciate your guys' attention. 1961 02:30:32,480 --> 02:30:32,960 I know it's late. 1962 02:30:33,440 --> 02:30:33,960 Thank you. 1963 02:30:39,910 --> 02:30:42,190 I don't think that's right. 1964 02:30:42,550 --> 02:30:43,250 Thank you, Cecilia. 1965 02:30:45,370 --> 02:30:46,770 And you do? 1966 02:30:47,870 --> 02:30:50,330 Madam Chair, commission members, 1967 02:30:50,770 --> 02:30:52,990 Gary Hassenflue, Garrison companies, 1968 02:30:53,290 --> 02:30:55,030 2001 Shiny Mission Parkway, 1969 02:30:55,470 --> 02:30:56,370 Mission Woods, Kansas. 1970 02:30:58,490 --> 02:31:01,010 We're a multi-family and mixed-use developer. 1971 02:31:01,010 --> 02:31:12,150 There's a belt in over six states and all types of projects from historic rehabs, 1972 02:31:12,310 --> 02:31:18,870 where we have old warehouses and office buildings and the loss to new construction, like what we have here. 1973 02:31:19,510 --> 02:31:25,990 Our focus tends to be on infill development areas, which is what we look at this as. 1974 02:31:28,110 --> 02:31:34,990 And we feel like with the type of design, type of project, we feel we bring a lot of value to the city, to the community. 1975 02:31:35,690 --> 02:31:38,430 And that's what we hope you'll see here. 1976 02:31:40,650 --> 02:31:44,090 We've had a great relationship so far with city staff. 1977 02:31:45,770 --> 02:31:49,130 We've been at this with already eight months with them. 1978 02:31:50,250 --> 02:31:54,330 But we really want to make it – we want to get it right with you all. 1979 02:31:54,330 --> 02:31:57,810 And so it's going to take a number of more months, so be it. 1980 02:31:58,490 --> 02:32:12,250 But, you know, we're here to present, to continue to listen to both your comments and the rest of the public to bring forth the best project, project we can. 1981 02:32:12,890 --> 02:32:19,510 We started, as was illustrated earlier, with over 170 units. 1982 02:32:20,170 --> 02:32:31,290 We heard the comments about density and we brought that down, way down, in our opinion, certainly 257 units. 1983 02:32:32,170 --> 02:32:39,330 We brought the commercial down from 10,000 square feet to 8357 square feet, I believe. 1984 02:32:40,250 --> 02:32:42,410 And then we went out and got a parking study. 1985 02:32:43,470 --> 02:32:53,330 We wanted to know, just like you and everybody else, even with the staging of car trips during 1986 02:32:53,330 --> 02:33:01,090 the day and during the evening, how we'd sit, and it displayed that we can adequately part 1987 02:33:01,090 --> 02:33:01,990 this development. 1988 02:33:03,650 --> 02:33:08,490 And then I know you'll be hearing more on the traffic study, too, on how to address 1989 02:33:08,490 --> 02:33:08,810 that. 1990 02:33:08,810 --> 02:33:12,070 But we think that this is a great thing in this community. 1991 02:33:12,310 --> 02:33:18,630 I mean, we so far has been, over all the years, I think the owner has seen five commercial 1992 02:33:19,170 --> 02:33:21,270 developments here, none of which ever got approved. 1993 02:33:22,770 --> 02:33:27,250 And this is the first time that one has come forward where there's a considerable amount 1994 02:33:27,250 --> 02:33:31,790 of residential use, more in line with, you know, the residential uses to the SAP. 1995 02:33:33,710 --> 02:33:39,610 So that's why we feel this might be the best proposal for the community. 1996 02:33:40,950 --> 02:33:46,970 I think Cecilia made it clear on the different things such as building materials and the life 1997 02:33:46,970 --> 02:33:52,950 that we've considered in this development, which is very high quality, the last. 1998 02:33:54,830 --> 02:34:00,170 We've developed over 20 communities in these six different states. 1999 02:34:00,170 --> 02:34:04,630 and every one of them we've held for ten years or more. 2000 02:34:05,330 --> 02:34:13,850 And so we're in this for the long run and we're in this to operate it and manage it proficiently. 2001 02:34:15,350 --> 02:34:22,790 So in the long-term hold discipline we have, you know, commands that. 2002 02:34:24,330 --> 02:34:35,590 So, I feel like everything else that was made clear, such as our compliance with the comprehensive plan and the like, was well put forth. 2003 02:34:35,890 --> 02:34:39,970 And I'm going to be here to address any other questions you all have. 2004 02:34:41,430 --> 02:34:51,150 And if you'd like me to also respond to a neighbor's comments, you know, please let me know whether you want me to do that, because I'd be happy to. 2005 02:34:51,470 --> 02:34:57,930 But speaking of neighbors, we want to be a good neighbor, just making that very clear. 2006 02:34:58,110 --> 02:35:03,150 And this is why we're here, why we're going to do what it takes to present the right project for you all. 2007 02:35:03,790 --> 02:35:10,430 So with that, let me introduce Julie, Nolfo Blockmuller, and she'll go into the 2008 02:35:10,430 --> 02:35:11,810 parkings today with you all. 2009 02:35:11,890 --> 02:35:12,150 Thank you. 2010 02:35:12,430 --> 02:35:12,790 Thank you. 2011 02:35:16,300 --> 02:35:16,720 Good evening. 2012 02:35:17,200 --> 02:35:21,880 I'm Julie Nolfo with Modular Group, and I'm here to talk to you about parking. 2013 02:35:22,200 --> 02:35:27,000 It's not the most exciting thing, but it's basically just a lot of it is just 2014 02:35:27,000 --> 02:35:30,400 math, and so I'm going to walk you through what we did. 2015 02:35:31,240 --> 02:35:35,340 As Gary and Cecilia mentioned, the density was coming down. 2016 02:35:35,580 --> 02:35:40,520 At the time that we did this test for the parking study, I do a lot of carbon studies too. 2017 02:35:41,120 --> 02:35:45,700 At the time I was doing the parking study, we were at 160 residential units. 2018 02:35:46,060 --> 02:35:48,320 And so that is what the parking study is based off of. 2019 02:35:48,480 --> 02:35:52,880 So actually now that they're down to 157, that would bring the numbers down just slightly, 2020 02:35:53,220 --> 02:35:54,140 somewhat it's presented in here. 2021 02:35:54,140 --> 02:36:00,520 We also assumed that there was about 5,000 square feet of retail commercial type use, 2022 02:36:00,780 --> 02:36:06,460 and just under 3,500 square feet of what we considered a quick service restaurant, 2023 02:36:06,740 --> 02:36:11,740 no drive through, not like a traditional fast food, but a typical kind of fast casual restaurant 2024 02:36:11,740 --> 02:36:18,180 where somebody would be in there for 30 minutes, 40 minutes, but not a long period of time. 2025 02:36:18,180 --> 02:36:30,480 Okay. 250 parking spaces are provided on the site and the objective of any traffic or parking study, that habit of mine, any parking study is to essentially do two things. 2026 02:36:30,800 --> 02:36:39,080 One is to compare the proposed parking to the city standards to help you all understand where what's being proposed and how that complies. 2027 02:36:39,460 --> 02:36:43,600 And then secondly, to look at it as it compares to the anticipated parking demand. 2028 02:36:45,020 --> 02:36:49,240 So with that, where we start off with is with the baseline code requirements. 2029 02:36:49,660 --> 02:36:54,400 That is looking at each of the proposed uses as a standalone individual use 2030 02:36:54,400 --> 02:36:56,680 and what the parking would be required for that. 2031 02:36:57,140 --> 02:37:02,300 So you can see for multifamily, it starts out at two parking spaces for the first 50, 2032 02:37:02,780 --> 02:37:05,620 one in three quarters for the second 50 dwelling units, 2033 02:37:05,860 --> 02:37:10,600 and then any dwelling units in excess of that 100 is parked at one and a half. 2034 02:37:11,520 --> 02:37:15,460 With respect to general retail, very typical for spaces per thousand. 2035 02:37:16,140 --> 02:37:20,140 And then for a restaurant, you have one parking space for every three seats, 2036 02:37:20,400 --> 02:37:23,580 and one parking space for every 250 square feet. 2037 02:37:24,280 --> 02:37:27,000 So when we start with the baseline requirements and you add those up, 2038 02:37:27,200 --> 02:37:30,020 what you're seeing there is table one from the parking study. 2039 02:37:30,540 --> 02:37:32,060 They have the parking study. 2040 02:37:32,380 --> 02:37:35,400 The table one from the parking study. 2041 02:37:35,860 --> 02:37:39,920 When you add those all up, that comes up to 345 parking spaces. 2042 02:37:39,920 --> 02:37:45,040 Now, as I mentioned, the site has 250 proposed parking spaces. 2043 02:37:45,840 --> 02:37:51,420 That is obviously less than 345, and so that's a deficit of 95 parking spaces where we start with. 2044 02:37:52,540 --> 02:37:58,600 But the city's code has some provisions for joint parking, shared parking, and we refer to them. 2045 02:37:58,760 --> 02:38:03,820 And that allows some flexibility when you're going to be looking at a mixed-use development. 2046 02:38:03,820 --> 02:38:20,640 And that is often where we go to look for consideration of a reduction in parking because what we're trying to do is not have this massive parking field where every use is at its peak at the same time and requiring all these spaces because then you end up with a lot of asphalt out there. 2047 02:38:21,280 --> 02:38:28,780 So the joint parking provision in the city's code essentially is set up to allow consideration of a parking reduction. 2048 02:38:30,020 --> 02:38:35,440 If you break down all the language in there, which we had a meeting with staff, and we talked through it, 2049 02:38:35,800 --> 02:38:43,560 essentially what that says is it allows for up to 50% of the required parking to be jointly used by the various residential retail and 2050 02:38:43,560 --> 02:38:44,740 restaurant uses on the site. 2051 02:38:45,520 --> 02:38:55,200 So go back to that 345 parking spaces that each of them require, and that says that 173 of those, so 50% of them, 2052 02:38:55,200 --> 02:38:56,680 can not be considered shared. 2053 02:38:57,460 --> 02:38:59,940 But anything above and beyond that could be considered shared. 2054 02:39:00,420 --> 02:39:03,960 So when you look at that we have 250 parking spaces on the site, 2055 02:39:04,300 --> 02:39:06,600 there's about 77 that could be considered shared. 2056 02:39:07,440 --> 02:39:10,460 Essentially, in a very simple form, it means there's some flexibility 2057 02:39:10,460 --> 02:39:13,340 in how you can look at the parking on the site. 2058 02:39:13,820 --> 02:39:16,380 So at that point, I turn my focus to demand, 2059 02:39:16,660 --> 02:39:21,020 because really I need to make sure that the anticipated parking demand 2060 02:39:21,020 --> 02:39:23,940 for these various uses isn't going to exceed the 250. 2061 02:39:23,940 --> 02:39:27,440 Otherwise, my recommendation together would be that you need more parking. 2062 02:39:28,360 --> 02:39:34,360 So with that, we used, we went to some national data, Institute of Transportation Engineers, 2063 02:39:34,940 --> 02:39:38,940 has a parking generation manual sixth edition from 2023 with the last time it was updated. 2064 02:39:39,660 --> 02:39:45,000 That gives us statistics that we can use for peak parking for all these various land uses that we were talking about. 2065 02:39:45,860 --> 02:39:49,880 The other thing that it does is it allows me to look at the hourly fluctuation. 2066 02:39:49,880 --> 02:39:54,780 So residential uses, such as the multifamily's proposed here, peaks overnight. 2067 02:39:55,120 --> 02:39:59,240 Peaks in the nighttime and overnight when most of your residents are back in residence 2068 02:39:59,240 --> 02:40:01,460 and their vehicles are parked on the site. 2069 02:40:02,480 --> 02:40:05,320 Conversely, your commercial uses, your retail and your restaurants, 2070 02:40:05,520 --> 02:40:07,580 those tend to peak during the daytime hours, 2071 02:40:08,700 --> 02:40:11,880 predominantly lunch and afternoon and into the evening time period. 2072 02:40:12,240 --> 02:40:15,720 And at that time, the residential peak is down 2073 02:40:15,720 --> 02:40:18,240 and they're operating at about 70% of their peak. 2074 02:40:19,200 --> 02:40:23,800 So we basically, we look at all this and again, like I said, it's just kind of math at this point. 2075 02:40:24,420 --> 02:40:27,480 And you'll see table four and table five, that is in your report. 2076 02:40:27,700 --> 02:40:29,660 And that goes through the various hours of the day. 2077 02:40:29,840 --> 02:40:33,220 So you can see the residential demand, the retail demand and the restaurant demand. 2078 02:40:33,740 --> 02:40:35,780 You add those up, you get your total demand. 2079 02:40:35,960 --> 02:40:38,580 And we look at what percentage occupied the site is. 2080 02:40:39,180 --> 02:40:45,880 So we reach a peak overnight, as to be expected, because it's predominantly some residential in there, 2081 02:40:45,880 --> 02:40:47,860 for both the weekday and the Saturday. 2082 02:40:48,140 --> 02:40:49,460 We looked at both of those time periods. 2083 02:40:49,680 --> 02:40:51,520 At about 93% occupied. 2084 02:40:52,300 --> 02:40:56,500 So at that time, you'd have about 18 to 20 parking spaces available. 2085 02:40:56,880 --> 02:41:00,260 It's 18, but as I said, he's come down to 157 units, 2086 02:41:00,440 --> 02:41:02,240 so you're probably picking up a space or two there. 2087 02:41:03,160 --> 02:41:06,560 So essentially at that time, there'd be 18 available parking spaces 2088 02:41:06,560 --> 02:41:09,180 open on the site that aren't even being occupied or used. 2089 02:41:10,280 --> 02:41:13,420 If we focus on the weekday, table four to your left, 2090 02:41:13,420 --> 02:41:18,880 During the day, you'll see that your residents, a number of them might be off-site with their vehicle. 2091 02:41:19,560 --> 02:41:25,340 And you'll see that the fluctuation goes from a low of about 60% to a high of about 84%. 2092 02:41:25,340 --> 02:41:30,600 And that's really as your commercial and your restaurant is sort of going up and down in its peaks, 2093 02:41:30,780 --> 02:41:32,940 that you see that oscillation in there. 2094 02:41:33,700 --> 02:41:39,240 Now on a Saturday, your residents' patterns are a little bit more erratic, right? 2095 02:41:39,240 --> 02:41:43,140 not everybody leaves, likes to sleep in, likes to hang out at home, likes to be at home. 2096 02:41:43,600 --> 02:41:47,540 So you don't see that residential come down as much as you do during a weekday, 2097 02:41:47,640 --> 02:41:51,440 but you do still see your activity with your commercial, your retail, and your restaurant. 2098 02:41:52,060 --> 02:41:56,260 So you'll see that our percentage occupied, if you look at table five over on the right, 2099 02:41:56,720 --> 02:42:02,620 kind of varies between 70 and 70s up to even 92 percent occupied. 2100 02:42:03,460 --> 02:42:06,960 So basically what we do is we look throughout all of these hours, 2101 02:42:06,960 --> 02:42:09,440 And that then helps guide our conclusions. 2102 02:42:11,540 --> 02:42:15,200 It's our opinion that the proposed 250 parking spaces is sufficient. 2103 02:42:15,520 --> 02:42:17,160 The demand would be less than that. 2104 02:42:17,260 --> 02:42:22,480 And at any given time, there's at least 18, if not more, open, unused spaces on the site. 2105 02:42:25,170 --> 02:42:29,570 We recommend consideration of approval of proposed parking supply for Greater Station, 2106 02:42:30,070 --> 02:42:36,730 which is allowed the 27.6% reduction based off of section 405-800G, 2107 02:42:36,730 --> 02:42:42,190 which does allow for this concept of shared or joined parking, essentially. 2108 02:42:42,510 --> 02:42:48,750 So everything that was done through there is in compliance with how the ordinance is set up to consider it. 2109 02:42:49,230 --> 02:42:57,950 And so that is our recommendation that they would have enough parking on their site to accommodate the anticipated demand associated with the various uses 2110 02:42:57,950 --> 02:43:02,290 and would have enough of a surplus to accommodate any fluctuation. 2111 02:43:03,490 --> 02:43:08,490 So with that, you know, that concludes our presentation. 2112 02:43:09,090 --> 02:43:11,290 But I understand you guys probably have a number of questions. 2113 02:43:11,530 --> 02:43:16,770 So if you want to start with that, I'm happy to bring up the right person to answer it if it's not me. 2114 02:43:20,210 --> 02:43:27,550 I have a concern about density. 2115 02:43:27,550 --> 02:43:33,510 And it's really in some ways driven by the parking issue. 2116 02:43:34,010 --> 02:43:42,590 And I understand that the statistics show that you can manage this. 2117 02:43:43,050 --> 02:43:46,310 But they are statistics and they're based on averages. 2118 02:43:46,810 --> 02:43:53,130 And that is over large populations of areas, et cetera. 2119 02:43:54,230 --> 02:44:04,090 And, you know, just like the rain, you know, on your phone, it shows the percentage of rain there's going to be every hour, you know, in a day. 2120 02:44:04,450 --> 02:44:07,290 And, you know, then the rain comes and it's totally different. 2121 02:44:07,750 --> 02:44:11,350 So there has to be wiggle room. 2122 02:44:11,890 --> 02:44:15,350 And I don't think 18 parking spots is enough wiggle room. 2123 02:44:15,350 --> 02:44:17,870 And so then I think to myself, well, 2124 02:44:21,280 --> 02:44:36,560 the retail, I mean, could say the restaurant can only operate during the day and if they all leave, if it closes in five, there won't be a problem because we know for sure those extra spots would be there. 2125 02:44:37,940 --> 02:44:44,060 But who would rent? Who would lease a restaurant if they couldn't be open in the evening? 2126 02:44:45,500 --> 02:44:49,800 So I wonder whether there really is enough parking. 2127 02:44:52,000 --> 02:44:59,480 I wonder if it might be helpful to have Julie perhaps talk about what the underlying data is and what it covers. 2128 02:45:04,650 --> 02:45:09,290 It is national 2129 02:45:12,300 --> 02:45:24,060 data. We do tend to average out better than a meteorologist in general with our predictions, because they do take a pretty broad spectrum of data, and they sort of filter it down to different things. 2130 02:45:24,060 --> 02:45:29,700 So we picked suburban and we picked it for about the same height. 2131 02:45:29,920 --> 02:45:33,020 They break it between low-rise, mid-rise, and high-rises. 2132 02:45:33,760 --> 02:45:41,720 And so you can kind of run it through these filters to try to get it as specific as you can to multi-family suburban. 2133 02:45:43,680 --> 02:45:46,300 I think it's four to 10 stories. 2134 02:45:46,560 --> 02:45:49,700 It's the category for mid-rise, if I'm not calling that correctly. 2135 02:45:50,620 --> 02:45:52,380 It's not close to transit. 2136 02:45:52,380 --> 02:45:57,440 Like all of these things are taken into consideration because obviously if we were in a more urban 2137 02:45:57,440 --> 02:46:02,280 environment or more of a high-rise or more of a low-rise, things like that, it would skew 2138 02:46:02,280 --> 02:46:03,840 the parking differently in one way or another. 2139 02:46:04,540 --> 02:46:11,440 So we did run it through to basically try to get it as all the data as close to mimicking 2140 02:46:11,440 --> 02:46:13,440 what was being posted on this site as possible. 2141 02:46:15,370 --> 02:46:16,410 Thank you for the answer. 2142 02:46:16,410 --> 02:46:16,670 Yeah. 2143 02:46:24,000 --> 02:46:27,240 Well, I was going to say, do we have other questions about parking? 2144 02:46:27,720 --> 02:46:30,540 Do we want to try, maybe, so we don't keep switching? 2145 02:46:31,080 --> 02:46:34,800 Do we? I am well aware. I have worked with numbers all my life, 2146 02:46:34,820 --> 02:46:38,040 and I am well aware that you could make them say anything you want. 2147 02:46:40,300 --> 02:46:46,380 I don't think the parking's adequate. That's just my opinion. 2148 02:46:47,140 --> 02:46:54,160 And if I'm a resident there and I come home and you're not giving me a parking spot, I'm going to be math. 2149 02:46:58,350 --> 02:47:03,730 I guess I take a different perspective of it. When people approach me in parking, and Gary, I'll tell you this is what I call me. 2150 02:47:05,870 --> 02:47:11,870 It's math, and there's not a lot of ability to manipulate the numbers, essentially. 2151 02:47:11,870 --> 02:47:17,870 I mean, everything is – I am given, essentially, when you go into the data source, it tells 2152 02:47:17,870 --> 02:47:20,950 you the hourly fluctuation for the land use by percentage. 2153 02:47:22,050 --> 02:47:24,310 And that's what we apply to the peak parking. 2154 02:47:24,550 --> 02:47:29,250 So, I mean, I don't have a lot of wiggle room in it in these numbers. 2155 02:47:29,910 --> 02:47:32,470 I wish I could say it's more complicated than it is. 2156 02:47:32,670 --> 02:47:36,310 It's pretty much just going and looking at what the peak parking demand is and then 2157 02:47:36,310 --> 02:47:40,950 multiplying at times the order of fluctuation for the various land uses and adding it up. 2158 02:47:42,370 --> 02:47:49,430 I will say we, 10 to 15 years ago, and Dan probably would back me up on this, 2159 02:47:50,330 --> 02:47:56,090 there used to be a desire to provide such a surplus of perky that you always had 2160 02:47:57,590 --> 02:48:04,790 15, 20 percent extra of a cushion. And then I think as planning and design has evolved, 2161 02:48:04,790 --> 02:48:11,690 There's been a lot of reflection on we don't want to see these big open parking 2162 02:48:11,690 --> 02:48:13,470 locks that aren't being capitalized on. 2163 02:48:13,950 --> 02:48:20,610 And so that cushion has gotten smaller from the sense of that depending upon the 2164 02:48:20,610 --> 02:48:24,550 land use and when you have residential, you can have a smaller cushion because 2165 02:48:24,550 --> 02:48:26,910 those are people who are continually using those spots. 2166 02:48:26,910 --> 02:48:34,730 But do not have built-in 15-20% of surplus and then have it just in there 2167 02:48:35,650 --> 02:48:36,850 unutilized most of the time. 2168 02:48:37,090 --> 02:48:43,050 The only problem is there's nowhere for these people to go if they only know the parking spot. 2169 02:48:43,630 --> 02:48:46,790 They weren't going to park in the Walgreens across the street, 2170 02:48:46,790 --> 02:48:59,850 or the other part of it is that you're going to share, allow the property to the west access in there 2171 02:48:59,850 --> 02:49:02,690 so that they can get to Grazer to go home or whatever. 2172 02:49:03,590 --> 02:49:13,250 And I don't see that the traffic lanes in the back of the car are suitable for commuting through that parking lot. 2173 02:49:13,250 --> 02:49:17,450 So my understanding is that the cross access is a future cross access. 2174 02:49:17,590 --> 02:49:21,830 It's not being built at putting right now, but it will be there in the future. 2175 02:49:23,070 --> 02:49:33,070 Yes, that is sort of the best practice to try and consolidate as many curb cuts as possible so that there's less access points to major roads like all it. 2176 02:49:34,150 --> 02:49:39,690 So I think the thing is, even within the parking city that you gave us, 2177 02:49:39,690 --> 02:49:47,390 It said that the parking generation manual peak parking demand would actually be 299 spaces. 2178 02:49:47,990 --> 02:49:51,590 So I mean that's in the study that came from you. 2179 02:49:52,470 --> 02:50:01,750 The other thing is that the property to the west actually uses that property to park today. 2180 02:50:02,130 --> 02:50:05,370 So you also have overflow from the west property. 2181 02:50:05,870 --> 02:50:07,870 That is primarily where they park. 2182 02:50:07,870 --> 02:50:16,790 So I think, I mean, to me, based upon what we're seeing here, the parking is definitely not adequate. 2183 02:50:17,050 --> 02:50:25,230 Even for the residents there, you're saying residential demand is 232. 2184 02:50:25,710 --> 02:50:32,470 And I think when we look at residential demand, the initial required was 278. 2185 02:50:33,750 --> 02:50:41,870 So we have 278 on the initial table, 299 peak parking across all of them, and we're at 250. 2186 02:50:42,290 --> 02:50:43,250 So that's quite a gap. 2187 02:50:43,310 --> 02:50:46,790 So you're kind of mixing apples and oranges there. 2188 02:50:46,990 --> 02:50:52,930 So the 299 is if you assumed all three uses peaked at the exact same moment, which they don't. 2189 02:50:53,090 --> 02:50:54,650 And that was the point it was trying to make in there. 2190 02:50:55,090 --> 02:50:58,290 When you look at their individual peaks, that would add up to 299. 2191 02:50:58,290 --> 02:51:02,230 But that doesn't account for any kind of temporal or hourly fluctuation, 2192 02:51:03,170 --> 02:51:07,690 which the commercial is not open in the evening or in the nighttime, over nighttime, 2193 02:51:08,370 --> 02:51:10,270 when the residential is at its peak. 2194 02:51:10,450 --> 02:51:15,270 And that's why mixed use works when you have the right components there. 2195 02:51:15,450 --> 02:51:21,150 When you have residential with retail or commercial, it works because of how they're peaking characteristics. 2196 02:51:21,410 --> 02:51:24,910 So the 299 is just saying if they all peaked at the same time, it would be that. 2197 02:51:24,910 --> 02:51:31,270 But the very next paragraph says, it doesn't take into consideration temporal fluctuations, which is appropriate at this location. 2198 02:51:31,650 --> 02:51:38,730 So between 7 or 6 o'clock and 9 o'clock, you would normally never rest on open. 2199 02:51:39,570 --> 02:51:41,390 And the people will be home. 2200 02:51:42,490 --> 02:51:44,410 Some would be home, but not everybody's home. 2201 02:51:44,870 --> 02:51:47,290 Like, for instance, I'm not home tonight. 2202 02:51:48,630 --> 02:51:51,510 I mean, I'm a perfect example. 2203 02:51:51,510 --> 02:51:52,790 I'm not home tonight. 2204 02:51:53,690 --> 02:51:56,170 So, you know, not everybody is at home. 2205 02:51:56,750 --> 02:52:00,970 And that is where, if you follow through, there is, 2206 02:52:01,070 --> 02:52:03,650 it is assumption that as you get into the evening hours, 2207 02:52:03,850 --> 02:52:09,010 more and more residents are home, but not all of them are home. 2208 02:52:09,170 --> 02:52:14,270 And we assume full occupancy of this entire multi-family, 2209 02:52:14,670 --> 02:52:18,870 but not everybody is home by 6 or 7 or 8 o'clock at night. 2210 02:52:18,870 --> 02:52:26,190 But I mean, and then it bleeds over into the list of uses which are conditional or permitted. 2211 02:52:26,790 --> 02:52:30,770 There's a long list of types of businesses that can rent in there. 2212 02:52:31,050 --> 02:52:37,570 And I would think we would have to go through every one of those and really look at it and see when those businesses are open, 2213 02:52:37,710 --> 02:52:44,590 because those would affect the study and I don't think it drill down to all of those businesses. 2214 02:52:46,870 --> 02:52:53,330 Correct. The parking studies typically reflect the proposed – and I understand what you're saying. 2215 02:52:53,410 --> 02:52:56,670 There's a difference between what you're being asked to approve versus parking studies normally, 2216 02:52:56,890 --> 02:53:01,210 just like the traffic study does, reflects the proposal in and of itself. 2217 02:53:01,590 --> 02:53:06,390 So there is that disconnect that there might be other conditional uses that might be allowed. 2218 02:53:07,910 --> 02:53:10,850 One last thing I'll circle back to is the 278. 2219 02:53:10,850 --> 02:53:16,590 So that, when I said apples and oranges, that 278 is based off the baseline code. 2220 02:53:17,390 --> 02:53:21,350 So that has code and demand are different things. 2221 02:53:21,730 --> 02:53:28,430 Code is just what is required for your code and demand is actually what is anticipated to be done. 2222 02:53:28,430 --> 02:53:35,370 But our code, if our code, if we didn't have any retail and it was all residential, our code would be 278. 2223 02:53:35,530 --> 02:53:35,790 Correct. 2224 02:53:36,050 --> 02:53:38,690 And I would not be saying that there should be a shared parking study. 2225 02:53:38,690 --> 02:53:41,850 I would have told Gary when he called it, it's nothing I could do because there's no 2226 02:53:41,850 --> 02:53:44,450 share of parking element there because it was just the residential. 2227 02:53:45,210 --> 02:53:45,310 Yes. 2228 02:53:45,950 --> 02:53:50,210 However, and this is getting out of my area, it's Paterson, probably it's Jason's, but 2229 02:53:50,210 --> 02:53:51,690 it is a planned development. 2230 02:53:51,870 --> 02:53:57,530 And I've done parking studies for single uses, in particular, more often not multifamily 2231 02:53:57,530 --> 02:54:02,810 when they're in a planned development that shows a lot of times that you can use 2232 02:54:02,810 --> 02:54:07,550 a lower parking rate than what the codes require. 2233 02:54:08,490 --> 02:54:11,870 So I'm not saying that's what's being done here, but it is a plan development and there 2234 02:54:11,870 --> 02:54:19,210 is that flexibility to, I think it was said best, basically tailor the ordinance to the 2235 02:54:19,210 --> 02:54:22,570 code specifically to the site and that includes parking. 2236 02:54:22,730 --> 02:54:27,690 And it is not unusual that parking is one of the things that is considered in plan 2237 02:54:27,690 --> 02:54:30,930 developments at something lower than the typical baseline Coder parks. 2238 02:54:32,050 --> 02:54:36,790 So, again, there's that flexibility because they are doing a plan 2239 02:54:36,790 --> 02:54:37,150 development. 2240 02:54:39,450 --> 02:54:41,070 Yeah, I have another question. 2241 02:54:42,490 --> 02:54:48,490 Did any of the study take in UPS, FedEx, Amazon? 2242 02:54:49,630 --> 02:54:54,790 So the parking data basically is collective of the demand on the site 2243 02:54:54,790 --> 02:55:03,270 So, for example, and I don't have top of my head how many studies this was based off of, but I know it was, it looked at it, it was quite, there was quite a few of them, but say it's 30. 2244 02:55:04,030 --> 02:55:12,730 And so it doesn't differentiate who was a resident versus maybe running the front office or working with amenities versus delivery. 2245 02:55:13,050 --> 02:55:18,390 What they do is they just basically count the number of vehicles parked on the site at any given hour. 2246 02:55:18,770 --> 02:55:23,050 And so that captures anybody who's parked on that site at that time. 2247 02:55:23,050 --> 02:55:24,210 So it includes that. 2248 02:55:24,210 --> 02:55:28,890 Well, blueberries will take up four and five spots, and they don't care if they block everything. 2249 02:55:29,210 --> 02:55:34,110 Well, that becomes more of a, yeah, that's a tight issue, but yeah. 2250 02:55:34,230 --> 02:55:34,490 Yeah. 2251 02:55:34,750 --> 02:55:38,570 I live in a condo, and I can tell you for a fact, they don't care what they block. 2252 02:55:39,450 --> 02:55:39,710 Yeah. 2253 02:55:45,070 --> 02:55:48,330 But there's going to be a line up a little bit. 2254 02:55:49,830 --> 02:55:50,230 Okay. 2255 02:55:51,190 --> 02:55:53,130 If I may address that, sir. 2256 02:55:53,130 --> 02:55:55,810 about the topic at hand. 2257 02:55:58,370 --> 02:56:07,330 Our tenant population are going to be single people and very small families or couples, really, 2258 02:56:07,790 --> 02:56:10,750 because we're talking studio and one-bedroom units. 2259 02:56:11,390 --> 02:56:12,090 Just a handful. 2260 02:56:14,610 --> 02:56:15,890 Something like that. 2261 02:56:16,030 --> 02:56:18,210 Six, thank you, of two-bedroom units. 2262 02:56:19,670 --> 02:56:27,890 And what we're seeing in our communities now is a lot of tenants, especially in that demographic, 2263 02:56:28,370 --> 02:56:29,270 they don't have a car. 2264 02:56:30,770 --> 02:56:32,010 They don't need a car. 2265 02:56:32,710 --> 02:56:34,610 They're cheaper not to have a car. 2266 02:56:35,190 --> 02:56:35,970 It could be any more. 2267 02:56:36,330 --> 02:56:37,110 I'm not using it. 2268 02:56:38,370 --> 02:56:39,410 It may. 2269 02:56:42,050 --> 02:56:46,530 And sure, we have to take into account the worst of the ones that will. 2270 02:56:46,530 --> 02:56:54,210 But and this is just the start. I know I know maybe y'all think it's just sci-fi or something, but you know Waymo is out 2271 02:56:55,030 --> 02:56:58,910 And and they're driving where you don't need a car. You just call it 2272 02:56:58,910 --> 02:57:01,650 You can already use you uber to get around and 2273 02:57:02,650 --> 02:57:07,130 It's a lot of a lot of people a lot of young people are finding that it's cheaper to just do that 2274 02:57:07,130 --> 02:57:13,350 Where the own and pay the insurance the maintenance everything on a car the trend is go the other way 2275 02:57:13,350 --> 02:57:15,370 that there's going to be less spaces needed. 2276 02:57:16,470 --> 02:57:22,490 And certainly that's what we see as we start to plan our developments for the future. 2277 02:57:27,640 --> 02:57:31,520 Mike, I had some questions about the genuine wall. 2278 02:57:32,380 --> 02:57:34,480 It seems very high. 2279 02:57:34,880 --> 02:57:39,660 I wasn't sure that the landscaping would cover it. 2280 02:57:39,820 --> 02:57:43,320 It seems like it's taller than our revitalists would ever grow. 2281 02:57:43,320 --> 02:57:53,300 And I wasn't sure about how it would look from the resident's point. 2282 02:57:54,040 --> 02:58:01,320 It's much taller than we usually agree to in Grief Corps, 2283 02:58:01,820 --> 02:58:07,140 and it doesn't have architectural interest. 2284 02:58:08,200 --> 02:58:22,880 Yeah, I think we did do, you know, we tried to add some articulation with the, you know, the Hawaiians and adding, you know, the various layers of trees and things. 2285 02:58:23,340 --> 02:58:27,860 The rendering that you see right now is intended to show about a three-year growth. 2286 02:58:27,940 --> 02:58:30,380 So it's really just off the bat. It'll grow from there. 2287 02:58:30,860 --> 02:58:38,380 but certainly you're not going to be able to cover the whole wall with the growth just because of how tall it is. 2288 02:58:38,760 --> 02:58:44,280 And there is also a retention aspect, so it goes down a bit, which is why it's so tall. 2289 02:58:44,440 --> 02:58:48,600 So I think that's something that we would be happy to take feedback on. 2290 02:58:48,780 --> 02:58:54,920 It's, you know, we haven't really shown that we showed this to the community when we met with them a month ago. 2291 02:58:55,460 --> 02:58:59,180 It wasn't exactly, you know, a point that was fixated on. 2292 02:58:59,180 --> 02:59:10,000 There's a lot of things going on with this development, but if that's something that you all have feedback about, we're happy to hear it and, you know, see if there's anything that we can do about that specifically. 2293 02:59:11,140 --> 02:59:19,540 Well, I think my feedback would be that it looks like a meadow, and if it would need to be heavily forested. 2294 02:59:20,580 --> 02:59:21,880 Okay, that's helpful. 2295 02:59:25,600 --> 02:59:41,720 The other thing is looking at the dog park in the pool is I wasn't sure whether we had a lot of information about the design element, what kind of fencing and all of that. 2296 02:59:42,160 --> 02:59:46,960 I guess I would appreciate that that be in the next iteration. 2297 02:59:49,040 --> 02:59:53,840 I think at the moment it's being proposed as kind of a wrought iron fence. 2298 02:59:55,040 --> 02:59:59,780 But we've, you know, heard from others that maybe it would be good to consider. 2299 03:00:00,000 --> 03:00:09,380 So, I think that's a little bit more dense so that there's a more of the visual barrier, particularly for the residents to the south, and I think that's something that we could, again, get some feedback on. 2300 03:00:09,680 --> 03:00:20,700 And, you know, I'd love to present you with a plan that you all would support. So, if you have specific direction, we would love to hear it just so that we can try and get there for you all. 2301 03:00:20,700 --> 03:00:30,220 On the landscaping, I would also say there isn't a lot of information about how it looks 2302 03:00:30,220 --> 03:00:40,220 if you're driving from west to east on olive in terms of buffering plants and things and 2303 03:00:40,220 --> 03:00:41,080 just visually. 2304 03:00:41,780 --> 03:00:42,260 Sure. 2305 03:00:42,340 --> 03:00:46,000 We have the landscape plan, but no rendering of the vegetation. 2306 03:00:46,000 --> 03:00:58,040 Right. And then on OLLIP, when I look at the renderings, it looks like the parking for retail is like completely screened. 2307 03:00:58,040 --> 03:01:03,100 And I didn't know if that was really the case because you can't see any cars there. 2308 03:01:03,280 --> 03:01:09,780 So, I mean, if it can be done so that you don't see the parking, that would be good. 2309 03:01:11,520 --> 03:01:13,940 Do you mean these areas up here? 2310 03:01:13,940 --> 03:01:14,180 Yeah. 2311 03:01:14,180 --> 03:01:14,560 Yeah. 2312 03:01:15,360 --> 03:01:18,920 If you look at, there's like planter boxes and all kinds of things. 2313 03:01:18,960 --> 03:01:21,940 I think we've got the planter boxes over here specifically. 2314 03:01:24,540 --> 03:01:25,980 Let's see if I can find that rendering. 2315 03:01:30,400 --> 03:01:42,620 And I, one other visual and it's not the plantings, but I was a little taken aback 2316 03:01:42,620 --> 03:01:48,320 that you weren't going to replace the whole sidewalk on ours. I looked at it 2317 03:01:48,320 --> 03:01:53,520 with the Ugo maps and some of it is deteriorated. Sure. I know some of it you 2318 03:01:53,520 --> 03:01:59,120 will have to replace and then others and just all the colors. I think lots of 2319 03:01:59,120 --> 03:02:03,820 sidewalk is different and I would think if you didn't replace it all at once 2320 03:02:04,440 --> 03:02:07,140 within a few years you would have to replace some of 2321 03:02:17,480 --> 03:02:22,140 those. Just a quick 2322 03:02:22,140 --> 03:02:28,600 Another question you put the other, what do you want to call them, developments up and 2323 03:02:28,600 --> 03:02:29,420 down Olive Street? 2324 03:02:29,640 --> 03:02:29,740 Sure. 2325 03:02:30,720 --> 03:02:33,760 Your current price point do you have on that? 2326 03:02:34,100 --> 03:02:36,700 Where does that fall in the whole mix? 2327 03:02:38,060 --> 03:02:39,460 That's something Gary will have to answer. 2328 03:02:39,480 --> 03:02:45,600 And then the second question is, you know, with what you're doing with the study and 2329 03:02:45,600 --> 03:02:47,720 take a look at demand in that area. 2330 03:02:47,720 --> 03:02:54,440 What are you expecting for how full this kind of is, 70 or 100 or what are you talking about? 2331 03:02:54,440 --> 03:02:55,160 Yeah, beyond RAM. 2332 03:02:59,730 --> 03:03:05,530 To address the estimated project rents, studios we're looking at roughly 1,500 a month, 2333 03:03:06,250 --> 03:03:12,310 two bedrooms, 20, excuse me, one bedroom, 2,100 a month and 2,700 a month for two bedroom units. 2334 03:03:13,390 --> 03:03:16,670 And is that comparable with the other ones that you will hire? 2335 03:03:17,610 --> 03:03:21,150 Right in there with Oliver and others. 2336 03:03:21,150 --> 03:03:28,910 Okay. And with the demand that we have, what are you expecting or how full you're going to be? 2337 03:03:29,570 --> 03:03:38,450 We're expecting 95 to 96 percent right now in terms of infill developments in St. Louis County. 2338 03:03:38,830 --> 03:03:40,850 It's very low vacancy. 2339 03:03:42,810 --> 03:03:44,270 Are there utilities included? 2340 03:03:45,470 --> 03:03:45,810 I'm sorry? 2341 03:03:46,030 --> 03:03:47,350 Are there utilities included? 2342 03:03:48,070 --> 03:03:51,950 No, the tail is on top of sewer, a landlord would pay for sewer, water, trash. 2343 03:03:52,670 --> 03:03:53,970 The rest of the utilities are on the test. 2344 03:03:54,050 --> 03:03:58,030 So each unit is going to have their own RICO unit on the top, on the roof? 2345 03:03:58,650 --> 03:03:59,030 Yes. 2346 03:03:59,670 --> 03:04:00,450 Both condensers. 2347 03:04:02,370 --> 03:04:02,810 Interesting. 2348 03:04:12,360 --> 03:04:13,540 One for Jason. 2349 03:04:17,540 --> 03:04:21,120 Could we arrange some additional parking from the Hall of East Corn? 2350 03:04:21,600 --> 03:04:22,500 Was there a slot for sale? 2351 03:04:22,500 --> 03:04:30,600 Is the question, can you obtain additional parking on other properties in the area? 2352 03:04:30,740 --> 03:04:31,440 All of East Carter? 2353 03:04:31,900 --> 03:04:32,020 Yeah. 2354 03:04:32,360 --> 03:04:32,400 Yeah. 2355 03:04:32,580 --> 03:04:33,740 Were there properties for sale? 2356 03:04:34,500 --> 03:04:34,680 Yeah. 2357 03:04:34,960 --> 03:04:35,040 So. 2358 03:04:35,400 --> 03:04:37,660 They're walking easily, walking distance. 2359 03:04:37,980 --> 03:04:40,560 So that is an option that could be considered. 2360 03:04:41,020 --> 03:04:44,100 And that's off-site parking arrangements. 2361 03:04:44,460 --> 03:04:49,420 I think our code says within 300 feet of distance, though it does limit the distance where 2362 03:04:49,420 --> 03:04:51,480 you can obtain that additional parking. 2363 03:04:51,480 --> 03:05:02,640 The issue with that is that the property owner who's the giver would have to agree to encumber their property to be able to support another devolve. 2364 03:05:03,060 --> 03:05:13,120 And so while that is a provision in our code that does allow that, and there's agreement that would have to be drafted between the parties and our city attorney would have to review that, 2365 03:05:13,740 --> 03:05:16,280 I don't see that being utilized very often because 2366 03:05:16,740 --> 03:05:19,300 property owners don't want to encumber their property 2367 03:05:20,000 --> 03:05:22,400 in the future based on somebody else's uses. 2368 03:05:22,560 --> 03:05:25,720 But that is an allowable option that could be explored. 2369 03:05:25,920 --> 03:05:28,200 The credit union, for example, you know, 2370 03:05:28,280 --> 03:05:30,320 they don't utilize all that parking. 2371 03:05:30,480 --> 03:05:31,320 It's across the street. 2372 03:05:31,760 --> 03:05:33,720 Could that be something maybe where the employees 2373 03:05:33,720 --> 03:05:35,420 can park for the commercial component? 2374 03:05:35,940 --> 03:05:36,400 Potentially. 2375 03:05:37,800 --> 03:05:41,320 I think you get into a situation where would users, 2376 03:05:42,220 --> 03:05:45,140 would they appreciate parking over there if they're going to the retail? 2377 03:05:45,320 --> 03:05:47,060 That's a little bit, that's off-site. 2378 03:05:47,640 --> 03:05:50,180 So I think from a user standpoint, is that viable? 2379 03:05:50,620 --> 03:05:51,740 I'm not so sure about that. 2380 03:05:51,900 --> 03:05:55,340 But I think, you know, it could be an option in terms of a fail-safe, 2381 03:05:55,620 --> 03:05:59,880 where if there was a situation where this lot is full, what do you do? 2382 03:06:00,300 --> 03:06:04,580 Well, if there's an agreement where in those instances the credit union, 2383 03:06:04,720 --> 03:06:07,980 and I'm just saying this for example, I don't think they've been approached at all, 2384 03:06:07,980 --> 03:06:13,680 But they would be able to allocate some of their parking to be able to support this project. 2385 03:06:13,820 --> 03:06:16,100 So conceptually, it's possible. 2386 03:06:16,440 --> 03:06:18,360 But then the person has to cross Allen. 2387 03:06:19,220 --> 03:06:21,580 The person would probably cross Grazier or all. 2388 03:06:21,780 --> 03:06:23,660 That's right, where there's a pedestrian crossing. 2389 03:06:23,900 --> 03:06:24,200 That's correct. 2390 03:06:24,840 --> 03:06:26,660 How about one further question? 2391 03:06:28,040 --> 03:06:30,360 I think when you go further east, then you're talking about vacant. 2392 03:06:30,700 --> 03:06:31,120 It's vacant. 2393 03:06:31,740 --> 03:06:36,420 So are the properties further east of the credit union or all vacant for a long stretch there? 2394 03:06:36,860 --> 03:06:39,980 In my view, that's probably a little bit too far. 2395 03:06:40,580 --> 03:06:44,780 And then it gets a little more complicated, I think, when you go further than that. 2396 03:06:46,540 --> 03:06:49,500 But, I mean, these are things that could be considered. 2397 03:06:49,800 --> 03:06:54,060 But, again, I believe the credit union owns that proper, that vacant lot next to them as well. 2398 03:06:54,200 --> 03:06:58,220 So I feel like that would be unrealistic. 2399 03:06:59,340 --> 03:07:00,880 There's some potential solutions here. 2400 03:07:01,020 --> 03:07:02,980 I don't know if you'd be the way that's ever happened. 2401 03:07:03,600 --> 03:07:08,280 Yeah, I mean, we did start to have some of those conversations on the front end 2402 03:07:08,280 --> 03:07:13,780 and decided to not really pursue them just exactly for what Jason said. 2403 03:07:14,300 --> 03:07:20,980 Certainly we'd be happy to reengage in those conversations and see if the adjacent properties are amenable, 2404 03:07:21,040 --> 03:07:24,280 if that is something that would really help the commission. 2405 03:07:24,580 --> 03:07:27,340 I'm not, obviously, don't know, haven't started those conversations. 2406 03:07:28,040 --> 03:07:37,500 But then the other thing is, you know, just having people cross Grazier, not sure, you know, if that's something that people would do or if they would circle until they found something. 2407 03:07:38,460 --> 03:07:41,620 I wouldn't want to live there and have to cross all up to get them. 2408 03:07:41,780 --> 03:07:47,820 No, all of Grazier, just the credit union. But you're right, I would agree. That seems like a no thank you. 2409 03:08:03,520 --> 03:08:06,320 I think Bethany is going to present the staff report. 2410 03:08:06,480 --> 03:08:08,060 We can probably get through that tonight. 2411 03:08:08,280 --> 03:08:10,420 If the commission is agreeable, it's your decision. 2412 03:08:10,740 --> 03:08:13,480 And then I do feel like maybe public comments, 2413 03:08:13,660 --> 03:08:15,560 this will take us right up to tonight. 2414 03:08:15,660 --> 03:08:17,600 There are perhaps a little bit beyond that. 2415 03:08:18,040 --> 03:08:19,680 And so that's something you want to discuss. 2416 03:08:19,680 --> 03:08:24,040 whether you want to go ahead and do that, cover that aspect that can give us a stopping point. 2417 03:08:24,580 --> 03:08:29,200 And then you could resume the public hearing and continue it to the next meeting, January 20th. 2418 03:08:29,320 --> 03:08:32,760 And then we can go from there. But that's the decision of the commission. 2419 03:08:37,060 --> 03:08:40,940 Well, if we can't finish, then we'll have people coming in again next month. 2420 03:08:43,020 --> 03:08:43,820 Unload first. 2421 03:08:45,320 --> 03:08:46,060 It's up to you. 2422 03:08:48,220 --> 03:08:48,560 Okay. 2423 03:08:49,500 --> 03:08:50,680 Thank you. 2424 03:08:51,500 --> 03:08:52,540 No problem. 2425 03:09:04,600 --> 03:09:06,520 Don't put that in the notes. 2426 03:09:09,540 --> 03:09:11,140 Who is the very agreeable person? 2427 03:09:12,860 --> 03:09:13,780 Okay. 2428 03:09:19,390 --> 03:09:20,310 Okay. 2429 03:09:57,380 --> 03:09:59,280 Bethany Morris, City Planner. 2430 03:10:00,280 --> 03:10:09,200 So I am going to try and get through these and not repeat a lot of the things that were said previous by the applicant and give you that information. 2431 03:10:10,720 --> 03:10:20,120 So this is for applications for rezoning from GC general commercial district to the Grazier station P and D planned mixed use development 2432 03:10:20,120 --> 03:10:35,180 district with the site concept plan in a site development plan for the lots addressed as 11004, 110026, 11032 and 11056 all in Boulevard as well as 825 and 827 Grazer Road. 2433 03:10:35,180 --> 03:10:36,120 So 2434 03:10:38,590 --> 03:10:42,250 this is an existing aerial photo of the existing conditions. 2435 03:10:42,490 --> 03:10:46,770 The last time we saw a project at this location, it was for the QT gas station, 2436 03:10:46,930 --> 03:10:50,310 and that was approved by the Planning and Zoning Commission and denied by city council. 2437 03:10:51,790 --> 03:10:58,030 And there was, there used to be a commercial strip center here that has since been demolished. 2438 03:10:58,330 --> 03:11:01,730 This existing commercial strip center still has some businesses in it that are operating. 2439 03:11:02,410 --> 03:11:09,430 And then there are these two locks behind here, which are part of the proposal that used to have single-family residences on it. 2440 03:11:09,530 --> 03:11:10,830 Those have since been demolished as well. 2441 03:11:16,460 --> 03:11:19,060 So there are two applications that have been filed with this request. 2442 03:11:19,600 --> 03:11:24,120 One is for rezoning from that GC general commercial to the planned mixed-use district. 2443 03:11:24,600 --> 03:11:29,040 This would only be our second project that has gone through this process for the planned mixed-use development. 2444 03:11:29,200 --> 03:11:30,500 The first would be Olia Village. 2445 03:11:31,840 --> 03:11:36,800 And so that process includes a site concept plan for the site as well as development standards. 2446 03:11:36,980 --> 03:11:42,080 And those development standards are the tailored zoning code requirements for this specific project. 2447 03:11:43,320 --> 03:11:48,280 Then we also have the site development plan, which includes site clearing, demolition, grading, utilities, 2448 03:11:48,760 --> 03:11:53,680 and the construction of the singular building, parking lot, retaining wall, and attention base and construction. 2449 03:11:55,360 --> 03:12:04,920 There also will be a lot consolidation plat, a boundary adjustment that will be applied for at a later date as part of this development to consolidate those six lots. 2450 03:12:06,500 --> 03:12:16,560 Again, here is just the overall site plan for the project, Olive and Grazer, and then there's parking in the front to the side, and then the majority is behind the building. 2451 03:12:19,850 --> 03:12:24,810 Again, the request is for mixed use development on 4.42 acres called Graser Station. 2452 03:12:25,570 --> 03:12:27,390 It will be constructed in one singular phase. 2453 03:12:28,490 --> 03:12:31,830 And it's a four story mixed use building with first floor retail. 2454 03:12:32,770 --> 03:12:37,250 It does taper down to one story when we get closer to the single family residential uses to the south. 2455 03:12:37,990 --> 03:12:45,210 There will be 157 residential units ranging from studios to two bedroom units, the majority being one bedroom. 2456 03:12:45,210 --> 03:12:45,950 All 2457 03:12:50,270 --> 03:12:53,310 right, so there are provided 250 parking spaces on site. 2458 03:12:53,850 --> 03:12:57,810 There were three curb cuts on all of and three curb cuts on Grazer. 2459 03:12:58,010 --> 03:13:01,530 Those have been reduced to two curb cuts on all of one curb cut on Grazer. 2460 03:13:02,690 --> 03:13:07,310 The building is set back minimum 20 feet from all of Boulevard right here at this closest point. 2461 03:13:07,670 --> 03:13:09,990 And it is set back 10 feet from Grazer Road. 2462 03:13:10,650 --> 03:13:18,510 And it does include a 35-foot residential buffer where the project is adjacent to single family residential to the south. 2463 03:13:20,490 --> 03:13:26,490 The public amenities included are this plaza area, which has landscaping, public art, bench seating. 2464 03:13:27,410 --> 03:13:30,210 And then there's this covered area that also includes outdoor seating. 2465 03:13:31,330 --> 03:13:35,890 And then the residential amenities of the dog park and the pool area. 2466 03:13:38,120 --> 03:13:41,380 Okay, so I'm going to briefly go over the comprehensive plan. 2467 03:13:42,020 --> 03:13:45,700 Cecilia did a very good job of discussing the comprehensive plan and the requirements. 2468 03:13:46,180 --> 03:13:50,220 So the comprehensive plan is our long-range planning document for this area. 2469 03:13:50,420 --> 03:13:51,620 So I'm going to go through that quickly. 2470 03:13:53,380 --> 03:13:59,240 So this area is located in our neighborhood commercial place type district, which is within our easel of corridor. 2471 03:13:59,960 --> 03:14:03,700 As you guys are aware, our easel of corridor is a tricky area. 2472 03:14:04,160 --> 03:14:08,120 There's a range of zoning and there's different types of developments. 2473 03:14:08,320 --> 03:14:11,360 We do have some more dense developments and we have some stable family residential as well. 2474 03:14:12,520 --> 03:14:15,680 So this is the location of the proposal. 2475 03:14:17,000 --> 03:14:21,580 Because of the configuration of these lots and the number of lots that they have together for this proposal, 2476 03:14:22,040 --> 03:14:27,020 it is a more dense site than we normally see along Olive. 2477 03:14:27,100 --> 03:14:32,400 A lot of these sites along Olive here in this corridor are shallow, 2478 03:14:32,620 --> 03:14:34,480 and they're adjacent to single-family residential. 2479 03:14:34,700 --> 03:14:35,660 So that's what we're seeing here. 2480 03:14:35,740 --> 03:14:37,480 These are all the single-family residential uses. 2481 03:14:38,120 --> 03:14:39,380 These are the commercial up here. 2482 03:14:39,380 --> 03:14:44,880 So this lot is, it does have more depth to it, which would seem to support more density. 2483 03:14:45,280 --> 03:14:45,320 Yes. 2484 03:14:45,560 --> 03:14:51,520 So the only thing is that's only because you took two single-family residential lots. 2485 03:14:52,860 --> 03:14:53,260 Correct. 2486 03:14:53,500 --> 03:14:54,040 They added those. 2487 03:14:54,200 --> 03:14:55,060 But as you can see here. 2488 03:14:55,100 --> 03:14:59,960 But if you think about that, it's only more dense because you have single-family residential that you're... 2489 03:15:00,000 --> 03:15:07,740 Merging in with it. And I think this is exactly where we get to low density, multifamily, low 2490 03:15:07,740 --> 03:15:14,900 density would be a couple of units per acre. Medium might be 5 to 20. We're at 4 and a half. 2491 03:15:15,180 --> 03:15:22,800 So maybe we'd be at 100 if we were living by this here. And since we took two single families, 2492 03:15:23,100 --> 03:15:29,340 really it should just be one and one, right? Like, so I think that's where, you know, 2493 03:15:29,340 --> 03:15:37,000 And I think there's a lot of comments here, hopefully, that this is like a very big sticking 2494 03:15:37,000 --> 03:15:47,460 point in that we're saying low-density multi-family would not be 36 units an acre. 2495 03:15:47,800 --> 03:15:52,940 That's not called low-density multi-family per our definition of very big differences. 2496 03:15:55,220 --> 03:15:57,280 Per our zoning code definition, that is accurate. 2497 03:15:58,820 --> 03:16:06,200 So I did just want to point out that these two residential lots here that are part of this development are actually zoned commercial 2498 03:16:06,200 --> 03:16:14,040 They were they did have a single-family residential use on it, but they are zoned commercial and they're included in this zoning district for neighborhood commercial place type 2499 03:16:15,540 --> 03:16:22,920 And then yes, so you bring up a good point about the load and medium density and then what our zoning code requires for those definitions 2500 03:16:22,920 --> 03:16:29,680 Our comprehensive plan does not provide a definition for what low density is, what medium density is, what high density is. 2501 03:16:29,960 --> 03:16:32,320 So then we have to rely on our zoning code. 2502 03:16:32,480 --> 03:16:40,040 And our zoning code does have a definition of low density being no more than six units an acre, which is very low. 2503 03:16:40,860 --> 03:16:46,960 Medium is less than 20 units an acre, and then high density is 20 or more units per acre. 2504 03:16:47,060 --> 03:16:48,380 So that is what our zoning code says. 2505 03:16:48,380 --> 03:16:53,380 Again, that has not been updated since the 1980s, and that is not in line with the type 2506 03:16:53,380 --> 03:16:55,040 of projects that we see being built today. 2507 03:16:55,420 --> 03:16:56,900 But that is what Arzónico says. 2508 03:17:00,030 --> 03:17:00,170 Okay. 2509 03:17:00,790 --> 03:17:04,810 So then the neighborhood commercial place type district has some goals of like walkability 2510 03:17:04,810 --> 03:17:05,510 for the neighborhood. 2511 03:17:07,470 --> 03:17:11,910 It does have established, excuse me, retail boutiques, neighborhood service businesses, 2512 03:17:12,090 --> 03:17:12,950 small scale restaurants. 2513 03:17:13,190 --> 03:17:16,270 Those are all things that they want to see on that all of corridor. 2514 03:17:17,550 --> 03:17:19,650 Encourage outdoor dining and retail site amenities. 2515 03:17:20,070 --> 03:17:23,690 Encourage parking to be to the side or rear of the building or landscape if it's in the front. 2516 03:17:24,650 --> 03:17:28,230 Building facade frontages should be oriented to the primary street, which would be olive, 2517 03:17:29,670 --> 03:17:32,010 and easy automobile access and parking. 2518 03:17:32,190 --> 03:17:35,910 So those are the things that the comprehensive plan would like to see in projects at this location. 2519 03:17:38,130 --> 03:17:43,550 So this is going back to the comprehensive plan where we have that disconnect with what's proposed 2520 03:17:43,550 --> 03:17:46,490 and then what our zoning code says for low and medium and high density. 2521 03:17:47,210 --> 03:17:52,530 So the examples that our comprehensive plan shows for examples of projects in 2522 03:17:52,530 --> 03:17:57,550 the area that would make sense in this area or in this neighborhood district are 2523 03:17:58,270 --> 03:18:02,670 DeMine Point and Clayton and the townhomes in Station Plaza, both of 2524 03:18:02,670 --> 03:18:05,610 which are high density by our definition. 2525 03:18:06,330 --> 03:18:09,550 They are actually in line with the type of density that's 2526 03:18:09,550 --> 03:18:12,390 that's proposed for this project. 2527 03:18:12,970 --> 03:18:16,530 With demand point and Clayton being the most similar to what this project is, 2528 03:18:16,610 --> 03:18:23,130 it's on the corner, it's multiple stories, it has commercial uses on the first floor. 2529 03:18:24,170 --> 03:18:26,650 It also has 36 units per acre. 2530 03:18:26,850 --> 03:18:31,790 So this would be considered high density, but it was used as an example in our comprehensive plan 2531 03:18:31,790 --> 03:18:33,670 for the types of projects we want to see there. 2532 03:18:33,710 --> 03:18:37,870 So there is a little bit of a disconnect with what it's calling for in terms of definition 2533 03:18:37,870 --> 03:18:39,350 and then what it's showing as examples. 2534 03:18:41,710 --> 03:18:48,490 Okay, and so then some considerations based on our comprehensive plan review for this project. 2535 03:18:49,170 --> 03:18:49,830 Excuse me. 2536 03:18:50,270 --> 03:18:55,780 So this project does meet a lot of the goals of the comprehensive plan, 2537 03:18:55,820 --> 03:18:59,020 but there still are areas of consideration that need to be discussed. 2538 03:18:59,780 --> 03:19:03,420 So the recommendations for the ESL corridor include low to medium density, 2539 03:19:04,400 --> 03:19:06,060 but no definitions are provided. 2540 03:19:06,060 --> 03:19:10,420 So then like I spoke about, we have to rely on our zoning code definitions, which haven't 2541 03:19:10,420 --> 03:19:12,060 been updated since the 1980s. 2542 03:19:13,120 --> 03:19:17,800 Example developments are high density, which would be more than 20 single family units 2543 03:19:17,800 --> 03:19:18,200 per acre. 2544 03:19:19,860 --> 03:19:25,400 So this site is 4.42 acres, which provides more lot depth than average along all of 2545 03:19:25,400 --> 03:19:25,700 Boulevard. 2546 03:19:25,920 --> 03:19:28,200 So it does have the potential to support higher density. 2547 03:19:29,260 --> 03:19:33,140 It is a four-story building with 55 feet and it's 55 feet tall. 2548 03:19:33,800 --> 03:19:38,260 It is adjacent to lower buildings, but there are taller buildings within the 2549 03:19:38,260 --> 03:19:40,520 olive corridor, and I have some examples to show as well. 2550 03:19:41,620 --> 03:19:43,120 There are other – oh, there we go. 2551 03:19:43,560 --> 03:19:45,320 Okay, so this is the east olive corridor. 2552 03:19:45,500 --> 03:19:46,340 That's what we're looking at here. 2553 03:19:46,420 --> 03:19:48,260 As you can see, this is the zoning map. 2554 03:19:48,860 --> 03:19:50,760 There are a lot of different zoning districts here. 2555 03:19:50,920 --> 03:19:53,320 There's not one continuous zoning district. 2556 03:19:54,080 --> 03:19:57,040 So that means that there's different requirements for a lot of these properties. 2557 03:19:58,040 --> 03:20:01,940 And our property that we're discussing here is this cluster. 2558 03:20:03,400 --> 03:20:07,540 And then we have this area right here, which does have some very dense residential. 2559 03:20:07,820 --> 03:20:08,960 It's a different type of development. 2560 03:20:09,220 --> 03:20:12,720 It's a different type of zoning district, but there is some density in terms of residential. 2561 03:20:13,200 --> 03:20:16,920 And then we have this building here, which is also three to four stories. 2562 03:20:17,140 --> 03:20:18,140 So it's a taller building. 2563 03:20:18,760 --> 03:20:24,840 And then we have the building, the, I think it's down here, the HPE building. 2564 03:20:25,360 --> 03:20:25,900 That's me. 2565 03:20:26,620 --> 03:20:29,200 Further down, further down, which is also multiple stories. 2566 03:20:29,200 --> 03:20:30,640 And so I have some examples of those. 2567 03:20:31,600 --> 03:20:36,960 So this is that building that I was talking about that's further down all of its multiple stories. 2568 03:20:37,060 --> 03:20:38,020 I think it's five or six. 2569 03:20:38,780 --> 03:20:44,660 And then we have this building here, which is 10845, Olive Boulevard, which is three stories. 2570 03:20:45,520 --> 03:20:50,140 And then we have the nest, which is another apartment complex that was built. 2571 03:20:50,380 --> 03:20:53,860 Again, it's in a different zoning district, but it does have four stories, 2572 03:20:53,940 --> 03:20:55,680 and it is a little bit less dense as well. 2573 03:20:55,680 --> 03:20:57,840 I'm sure you can hold it fine. 2574 03:21:02,330 --> 03:21:05,630 Then kind of switching gears, that's the comprehensive plan. 2575 03:21:06,190 --> 03:21:10,130 So then we also have the three types of planned zoning districts. 2576 03:21:10,390 --> 03:21:19,130 So they are requesting with this application to rezone from GC to the planned mixed use development. 2577 03:21:19,790 --> 03:21:25,170 So we have three different types of planned districts. 2578 03:21:25,690 --> 03:21:30,050 The first being the plan makes these development, which is what they are requesting with this project. 2579 03:21:30,410 --> 03:21:35,070 Again, like I mentioned, this would only be the second project to go through this process, the first being only a village. 2580 03:21:35,750 --> 03:21:40,390 We also have the planned residential development and the planned commercial district or development. 2581 03:21:40,850 --> 03:21:46,810 And as the name states, one is purely residential, one is commercial, this type is a mix of both. 2582 03:21:49,260 --> 03:21:53,060 Okay, so just a little bit of a background on the rezoning and then what's required for it. 2583 03:21:54,260 --> 03:22:07,180 So the plan zoning district procedure provides a procedure to allow development that does not meet the traditional standards of the zoning code due to things such as project size, phasing, configuration, site conditions, or design features. 2584 03:22:08,500 --> 03:22:13,300 It must meet several criteria that's outlined in section 405-390. 2585 03:22:13,420 --> 03:22:14,800 I will be going through some of those. 2586 03:22:15,020 --> 03:22:18,640 There is much too many to cover in one meeting, so I'm just highlighting some of them. 2587 03:22:18,640 --> 03:22:22,500 But they are, I did go through all of them in the stack report. 2588 03:22:24,690 --> 03:22:29,370 Final approval by ordinance of the city council based upon recommendation by the planning and zoning commission. 2589 03:22:30,070 --> 03:22:36,550 And the site concept plan and plan district ordinance, which is the development standards will govern nearly all aspects of the development. 2590 03:22:36,710 --> 03:22:38,830 So that's that tailored zoning code for the project. 2591 03:22:44,890 --> 03:22:45,230 Okay. 2592 03:22:45,570 --> 03:22:48,310 So this is where we talk about the criteria. 2593 03:22:48,310 --> 03:22:55,570 There are four sets of criteria, and each of them have a different number of criteria with them. 2594 03:22:55,630 --> 03:22:58,830 I'm going to try and highlight those for you so that we don't have to go through all of them. 2595 03:22:58,990 --> 03:23:03,310 They do, I do go through all of them again in the staff report on page 10 of the staff report. 2596 03:23:03,790 --> 03:23:06,970 I do not know what page that is in the agenda packet. 2597 03:23:07,310 --> 03:23:09,310 I assume it's somewhere in the 300s. 2598 03:23:09,530 --> 03:23:12,690 But if you wanted to take a look at that, it's all included there. 2599 03:23:13,610 --> 03:23:18,670 So there are four eligibility criteria, eight public benefit options. 2600 03:23:18,830 --> 03:23:19,430 Those are not criteria. 2601 03:23:19,650 --> 03:23:23,010 Those are just options that it could meet, and they are not exclusive. 2602 03:23:23,210 --> 03:23:25,610 There are other ways that they could include public benefit. 2603 03:23:26,410 --> 03:23:31,750 There are 13 planned mixed use development design criteria and 14 review criteria, 2604 03:23:31,970 --> 03:23:34,830 which is applied to all planned zoning districts. 2605 03:23:36,750 --> 03:23:37,210 Okay. 2606 03:23:37,890 --> 03:23:39,990 So starting with the eligibility criteria. 2607 03:23:39,990 --> 03:23:43,630 I did want to mention, so there's four of those. 2608 03:23:44,190 --> 03:23:46,810 Those being is located on one or more lots, 2609 03:23:46,890 --> 03:23:48,270 totally at least three acres in size. 2610 03:23:48,710 --> 03:23:49,230 This meets that. 2611 03:23:49,830 --> 03:23:52,730 Cannot be approved under provisions of another zoning district. 2612 03:23:53,110 --> 03:23:53,910 That meets that. 2613 03:23:54,650 --> 03:23:57,730 Number three, the subject property is zoned for the eligible type 2614 03:23:57,730 --> 03:23:59,870 of planned zoning district, which is the case. 2615 03:24:00,510 --> 03:24:02,370 And then number four, which I've highlighted. 2616 03:24:03,330 --> 03:24:07,410 So criterion four, the proposed development must substantially comply 2617 03:24:07,410 --> 03:24:13,050 with the provisions of the section 405-390, which is the zoning code, and generally consistent 2618 03:24:13,050 --> 03:24:16,830 with the applicable provisions of the comprehensive plan. 2619 03:24:16,950 --> 03:24:20,590 So that's why we just went through the comprehensive plan and talked about the requirements there. 2620 03:24:21,350 --> 03:24:27,490 So for this criterion, there are some areas of discussion related to density that do 2621 03:24:27,490 --> 03:24:28,150 need to be discussed. 2622 03:24:28,790 --> 03:24:33,370 In general, the proposed development substantially complies with the plan zoning code 2623 03:24:33,370 --> 03:24:33,770 district. 2624 03:24:34,690 --> 03:24:42,650 The proposal is generally consistent with the applicable provisions of the comprehensive plan, subject to further discussion by the Planning and Zoning Commission regarding density. 2625 03:24:46,230 --> 03:24:47,550 And then we have public benefit. 2626 03:24:52,530 --> 03:24:57,490 So, like I said, there are eight options that are outlined that I would go through in the staff report. 2627 03:24:58,110 --> 03:25:01,670 They do not have to meet all of them, but those are just options that can be provided. 2628 03:25:01,670 --> 03:25:07,810 This project does provide several of those options for public benefit, 2629 03:25:07,930 --> 03:25:11,750 including quasi-public parking facilities for the retail component, 2630 03:25:12,770 --> 03:25:15,630 new sidewalks for added pedestrian connectivity throughout the city, 2631 03:25:16,170 --> 03:25:18,610 varying of new overhead utility wires where feasible, 2632 03:25:19,550 --> 03:25:23,070 inclusion of landscaped plaza, which is that corner area with the benches 2633 03:25:23,070 --> 03:25:26,430 and the public art, the covered outdoor dining area, 2634 03:25:26,690 --> 03:25:29,750 and high-quality architectural design with quality materials. 2635 03:25:29,750 --> 03:25:34,370 So it does meet a lot of those requirements there, present within this application. 2636 03:25:35,910 --> 03:25:38,290 Okay. Then we have the design criteria. 2637 03:25:39,230 --> 03:25:41,110 So there are 13 design criteria. 2638 03:25:42,110 --> 03:25:46,870 And the project does meet the majority of the design criteria with a few areas of discussion. 2639 03:25:47,070 --> 03:25:54,410 And so there seems to be two main areas of discussion that are touched on in criteria 2, 12, and 13. 2640 03:25:54,550 --> 03:25:57,810 And that would be sufficient buffer adjacent to the residential. 2641 03:25:57,810 --> 03:26:01,010 And so that's where that really tall retaining wall comes in. 2642 03:26:01,590 --> 03:26:03,850 So retaining walls are allowed to be within the residential buffer, 2643 03:26:04,130 --> 03:26:07,870 but the retaining wall that they are proposing is 38 feet in height, 2644 03:26:08,050 --> 03:26:09,130 which is very tall. 2645 03:26:11,490 --> 03:26:15,050 So that kind of comes up in criterion 2, 12 and 13, 2646 03:26:15,210 --> 03:26:17,770 and we're talking about sufficient buffers and things like that. 2647 03:26:18,450 --> 03:26:20,850 So the height of the retaining wall should be discussed, 2648 03:26:20,850 --> 03:26:23,710 including additional screening measures such as landscaping, 2649 03:26:23,710 --> 03:26:27,230 a solid fence or alternative design options to reduce that height. 2650 03:26:27,970 --> 03:26:31,750 And then also criterion four, which is efficient use of parking. 2651 03:26:32,910 --> 03:26:38,150 So discussion with based on the parking study to determine if the commission is comfortable 2652 03:26:38,150 --> 03:26:43,650 with the proposed 250 parking spaces to be shared amongst all uses and if it meets 2653 03:26:43,650 --> 03:26:47,990 the requirements of efficient uses of parking including cooperative parking facilities. 2654 03:26:48,170 --> 03:26:51,990 And so that's where you have to discuss that shared parking agreement and see if 2655 03:26:51,990 --> 03:26:56,050 I'm sorry, discuss that parking study and see if you're comfortable with the 2656 03:26:56,050 --> 03:26:57,010 numbers that they've proposed. 2657 03:26:59,480 --> 03:27:01,560 Okay, and then here's just a visual of the rotating law. 2658 03:27:01,660 --> 03:27:02,460 I know that they showed that. 2659 03:27:03,000 --> 03:27:04,560 I also thought this was helpful. 2660 03:27:05,140 --> 03:27:06,860 So this shows this is one of the houses. 2661 03:27:07,420 --> 03:27:08,580 It looks like three Martin Grove. 2662 03:27:09,440 --> 03:27:13,820 And then it gets lower here because this is also going to be the detention 2663 03:27:13,820 --> 03:27:14,240 basin. 2664 03:27:14,640 --> 03:27:18,740 So what we're going to see of this wall is going to be about 8 feet 2665 03:27:18,740 --> 03:27:19,060 shorter. 2666 03:27:19,200 --> 03:27:23,140 So I think we'll see 30 feet where it's the detention basin because it'll 2667 03:27:23,140 --> 03:27:25,680 be covered by the water and then this tree row. 2668 03:27:26,840 --> 03:27:30,740 Then it goes up from here, here's the parking lot, and then here is the proposed building. 2669 03:27:31,300 --> 03:27:34,560 So that's just another view of that retaining wall. 2670 03:27:36,260 --> 03:27:36,740 Okay. 2671 03:27:37,080 --> 03:27:42,800 So then our last set of criteria is the review criteria that all plan zoning districts 2672 03:27:43,380 --> 03:27:46,640 have to go through, and there's 14 of those criteria. 2673 03:27:48,000 --> 03:27:52,120 And the proposal substantially meets 13 of these criteria, and so I've only 2674 03:27:52,120 --> 03:27:53,800 highlighted one to discuss today. 2675 03:27:55,400 --> 03:27:59,480 So number one, the proposed development is in harmony with the general purpose and intent 2676 03:27:59,480 --> 03:28:03,360 of this chapter and is generally compatible with and implements the planning goals and 2677 03:28:03,360 --> 03:28:04,820 objectives of the comprehensive plan. 2678 03:28:05,260 --> 03:28:09,820 So again, that just comes back to doesn't meet the comprehensive plan in terms of density. 2679 03:28:10,140 --> 03:28:12,300 And so again, that's just the discussion that needs to be had. 2680 03:28:14,330 --> 03:28:14,690 Okay. 2681 03:28:14,810 --> 03:28:17,630 So then I also wanted to briefly cover the traffic impact study. 2682 03:28:18,470 --> 03:28:28,270 So the study does note that the northbound left turn movement on Grazer will eventually degrade from the current level of service E. 2683 03:28:28,430 --> 03:28:35,110 So that's what it's at now, level of service E, to level of service F by 2036 buildup. 2684 03:28:35,530 --> 03:28:36,550 So that's what we're looking at. 2685 03:28:36,630 --> 03:28:39,310 I won't change projected until 2036. 2686 03:28:39,950 --> 03:28:43,890 And it would just change from the current LOS E to LOS F. 2687 03:28:45,130 --> 03:28:50,350 However, corridor-wide signal timing adjustments by MODOT should address these concerns. 2688 03:28:52,170 --> 03:28:58,050 The study did conclude that node modifications to the existing street network are recommended at this time, 2689 03:28:58,150 --> 03:29:03,530 while noting that those timing modifications would help improve the intersection efficiency. 2690 03:29:04,390 --> 03:29:08,790 Since this study has been made and since the staff report has been put out, we have heard back from MODOT 2691 03:29:08,790 --> 03:29:17,070 And they have reviewed the traffic impact study and provided initial comments about the safety of the left turns on all of Boulevard from the development. 2692 03:29:17,290 --> 03:29:17,910 So that would be here. 2693 03:29:19,230 --> 03:29:21,130 These discussions are still ongoing. 2694 03:29:21,330 --> 03:29:22,250 So we're still discussing those. 2695 03:29:22,330 --> 03:29:24,110 We just heard from them last week about this. 2696 03:29:25,590 --> 03:29:32,090 And the city traffic consultant Dan Shane is here to answer any questions if you have any additional questions about the parking city. 2697 03:29:32,410 --> 03:29:38,310 I just wondered about the crosswalks for people who want to cross over. 2698 03:29:38,550 --> 03:29:41,990 I will let Google will bring to it a smoothie or something. 2699 03:29:42,870 --> 03:29:44,150 Could they repaint those? 2700 03:29:44,590 --> 03:29:47,210 Because they don't look very good and I don't think they're safe. 2701 03:29:48,090 --> 03:29:54,770 That is definitely something that we can discuss with them is repainting those existing crosswalks, 2702 03:29:54,890 --> 03:29:57,730 which I believe you're talking about right here. 2703 03:29:58,710 --> 03:29:59,850 because, yes, it is existing. 2704 03:30:00,000 --> 03:30:04,500 But the paint has come off, so that's absolutely something that we can discuss with them is to maintain that. 2705 03:30:04,840 --> 03:30:18,160 So are you talking with them about a left turn arrow or I think because right now it's just blinking yellow and the way that, I mean, regardless of anything new goes in there, 2706 03:30:18,540 --> 03:30:25,960 the way that when you're trying to turn left, the other car comes straight and you don't really know where they're going and you can't see it all. 2707 03:30:25,960 --> 03:30:29,980 I mean, it's a terrible intersection to go left from Grazier on top. 2708 03:30:33,660 --> 03:30:36,500 Our traffic consultant is here and he can answer those questions. 2709 03:30:36,700 --> 03:30:39,720 You can bring him up now if you want, but I do have a few more slides if you want. 2710 03:30:39,800 --> 03:30:41,780 Okay, bring him up when we're done. Thank you. 2711 03:30:43,000 --> 03:30:43,360 Okay. 2712 03:30:43,940 --> 03:30:45,400 I just have like two or three more slides. 2713 03:30:45,680 --> 03:30:46,460 Yeah, I appreciate it. 2714 03:30:46,620 --> 03:30:48,280 So then we have the shared parking study. 2715 03:30:48,440 --> 03:30:51,660 And so I feel like their consultant did a really good job of going through that. 2716 03:30:51,660 --> 03:30:56,560 So what I would like to just go through is section 405-800-G4. 2717 03:30:56,720 --> 03:31:02,280 And so that's our section of the zoning code that allows for this type of process to happen with the shared parking. 2718 03:31:02,940 --> 03:31:10,240 So it allows for up to 50% of the required parking to be used jointly or shared amongst uses if approved by the Planning and Zoning Commission. 2719 03:31:10,680 --> 03:31:20,100 So they are allowed to, you know, conduct this study and submit it for review to reduce their parking and have 50% of it shared because of this provision. 2720 03:31:20,100 --> 03:31:22,960 So they are following a provision that is allowed in our zoning code, 2721 03:31:23,120 --> 03:31:26,100 but it is something that has to be approved by the Planning and Zoning Commission. 2722 03:31:28,660 --> 03:31:32,220 So 345 parking spaces are required per our zoning code. 2723 03:31:33,600 --> 03:31:35,900 173 parking spaces cannot be considered shared. 2724 03:31:36,040 --> 03:31:40,760 So 173 of those has to be provided on site cannot be part of the shared number. 2725 03:31:41,860 --> 03:31:47,420 But any parking stalls beyond the 173 spaces may count towards more than one use. 2726 03:31:47,420 --> 03:31:55,160 And so that's what we're looking at with those additional, I think it's like 77 to get to the 250 and so that's where that share is coming in. 2727 03:31:55,740 --> 03:32:01,700 And then it's based on demand and not our code requirement by use. 2728 03:32:01,900 --> 03:32:06,820 So it's just a little bit different way of looking at it and reducing that number of parking. 2729 03:32:10,330 --> 03:32:15,650 Okay. And so I did just provide a summary of areas of discussion and I think some of those got cut off. 2730 03:32:15,970 --> 03:32:18,430 So, oh no, they're all in there. 2731 03:32:18,570 --> 03:32:18,670 Good. 2732 03:32:19,330 --> 03:32:23,010 Okay, so conformance with the goals and objectives of the comprehensive plan. 2733 03:32:23,090 --> 03:32:26,570 I feel like we've talked about that a lot along the east all of the corridor. 2734 03:32:27,230 --> 03:32:34,210 The proposed density of 157 units at 35.6 residential units per acre within the four-story building. 2735 03:32:35,170 --> 03:32:38,110 The overall site plan design and architectural quality. 2736 03:32:38,930 --> 03:32:42,590 The retaining wall height reduction measures or alternative screening options. 2737 03:32:43,390 --> 03:32:47,910 The parking study findings for the proposed 250 spaces to be shared amongst all uses, 2738 03:32:48,290 --> 03:32:50,370 and then the traffic impact study findings. 2739 03:32:50,810 --> 03:32:57,950 So that's kind of the summary that I put together based on our review at staff level of the proposal. 2740 03:32:59,330 --> 03:32:59,790 Great job. 2741 03:33:00,470 --> 03:33:00,990 Thank you. 2742 03:33:01,870 --> 03:33:04,990 And so then just to remind you of what we're doing tonight, 2743 03:33:05,530 --> 03:33:09,330 staff recommends that the commission provide feedback on these issues to the applicant, 2744 03:33:09,330 --> 03:33:11,530 as well as any comments received by the public. 2745 03:33:11,530 --> 03:33:19,150 Based on the direction given to staff and the applicant, any revisions to the plans can be made and submitted for further consideration in a vote at an upcoming meeting. 2746 03:33:20,610 --> 03:33:21,050 Okay. 2747 03:33:21,150 --> 03:33:22,350 Would you like to hear from Dan now? 2748 03:33:22,670 --> 03:33:22,870 Yes. 2749 03:33:23,130 --> 03:33:23,290 Okay. 2750 03:33:23,470 --> 03:33:23,750 Thank you. 2751 03:33:37,500 --> 03:33:38,740 Good evening, commissioners. 2752 03:33:38,780 --> 03:33:40,340 My name is Dan Shane with HR Green. 2753 03:33:40,600 --> 03:33:49,140 We are the city's traffic engineering consultant and we had a chance to do the traffic engineering study as an independent review for this development. 2754 03:33:50,500 --> 03:33:51,960 I'd be happy to answer any questions. 2755 03:33:51,960 --> 03:33:53,580 I know there's already one on the table. 2756 03:33:54,460 --> 03:33:55,920 And that is a great question. 2757 03:33:56,340 --> 03:34:03,460 If I can reiterate, the question, I think, was the northbound left turn has a flashing yellow arrow, 2758 03:34:04,460 --> 03:34:06,820 which is something that MoDOT's doing a lot of nowadays. 2759 03:34:07,020 --> 03:34:09,640 But right now, that is just a permissive movement. 2760 03:34:10,420 --> 03:34:13,740 So it becomes more challenging when you got opposing traffic. 2761 03:34:13,960 --> 03:34:14,700 Is that right? 2762 03:34:16,440 --> 03:34:17,880 Because they go straight. 2763 03:34:18,420 --> 03:34:20,260 And you don't know what direction you're going. 2764 03:34:21,240 --> 03:34:27,500 So when we met with MODOT last week, that happened to be one of their concerns too, so they recognized that as well. 2765 03:34:28,160 --> 03:34:36,860 At this point, we haven't done any analysis with it to change timings from the existing signal operations to make sure that would work or not. 2766 03:34:37,480 --> 03:34:48,440 But again, as Bethany said, part of the overall plan in the future as that level of service starts to degrade to a level of service F for the 10-year planning horizon, 2767 03:34:49,080 --> 03:35:01,300 Eventually, MODOT will have to come in, and they're agreeable to this, to come in and start retiming signals along all of Bulbar to make sure everything works together instead of just one isolated location. 2768 03:35:02,400 --> 03:35:13,200 Okay. I just don't understand how we could put a cool development there without changing when it already isn't working for the neighborhood. So that would just be my feedback. 2769 03:35:13,200 --> 03:35:24,940 Yeah, so we adjust the timing slightly, but if you think about all the traffic on all the Boulevard, it has a set cycle length that it just helps progress traffic through there. 2770 03:35:25,020 --> 03:35:33,820 We really can't start changing the cycle length of this particular intersection to be different than the upstream or downstream location. 2771 03:35:34,120 --> 03:35:37,300 So we're kind of confined to that, those parameters. 2772 03:35:37,300 --> 03:35:44,380 But the individual green time for Grazer Road, we can make slight adjustments to that. 2773 03:35:45,380 --> 03:35:54,420 So, as it turns out with this development and the additional traffic with, you know, compared to what the level service is today, 2774 03:35:54,900 --> 03:35:59,200 you know, Bethany said it goes from level service E to F in your 2036 volume. 2775 03:35:59,200 --> 03:36:06,680 It really accounts to about 10, an average of 10 seconds per entering vehicle of delay, 2776 03:36:06,980 --> 03:36:07,720 additional delay. 2777 03:36:08,960 --> 03:36:12,480 And that happens to kind of push it over that threshold from EDA. 2778 03:36:13,960 --> 03:36:15,680 Yeah, I just think, I don't know. 2779 03:36:15,800 --> 03:36:21,200 I mean, as someone who lives by there, I can't believe that because it's already very difficult to turn left 2780 03:36:21,200 --> 03:36:27,840 on D'Ala from Grazier when there are people coming from Walgreens in the neighborhood across the street. 2781 03:36:27,840 --> 03:36:34,860 So now, if everybody from – because you can't – with where the property is, we 2782 03:36:34,860 --> 03:36:38,540 are saying we have it out on the olive, but you also cannot turn left. 2783 03:36:38,680 --> 03:36:42,500 I mean, we say you can turn left, but it's not capable unless – 2784 03:36:42,500 --> 03:36:44,900 it's a Sunday morning and there's no traffic, right? 2785 03:36:45,300 --> 03:36:47,840 So everyone's going to have to funnel on to Grazier. 2786 03:36:48,340 --> 03:36:53,480 And if now people are funneling based upon where that is, you can't – 2787 03:36:53,480 --> 03:36:56,120 and people can't very easily turn left already. 2788 03:36:56,120 --> 03:37:01,000 I just think it doesn't it doesn't make sense the way finding how that would even work 2789 03:37:01,000 --> 03:37:05,800 Yeah, that could be that could be challenging and we brought that up today. Yeah to the applicant too 2790 03:37:06,320 --> 03:37:11,880 But because of that is the difficulty and make that left turn out of the unset Western driveway 2791 03:37:11,880 --> 03:37:16,460 Yeah, we did assign a lot of that traffic back through the site 2792 03:37:17,020 --> 03:37:20,540 Maybe not ideal but back through the site to Grazier Road, right? 2793 03:37:20,980 --> 03:37:22,820 And then make a left at Grazier 2794 03:37:22,820 --> 03:37:26,100 Again, kind of compounding the problem that you already have. 2795 03:37:26,440 --> 03:37:28,920 We understand that. 2796 03:37:28,920 --> 03:37:29,160 Okay. 2797 03:37:29,600 --> 03:37:30,140 Thank you. 2798 03:37:30,460 --> 03:37:36,580 Can it be fixed to be like Greg and Olive where you get the full arrow? 2799 03:37:37,720 --> 03:37:38,540 It can. 2800 03:37:38,760 --> 03:37:40,380 And that's what MoDOT wanted us to look at. 2801 03:37:40,540 --> 03:37:43,840 And we just haven't, we just met with them last week and we haven't had a chance to 2802 03:37:43,840 --> 03:37:45,160 dig into that just yet. 2803 03:37:45,300 --> 03:37:46,520 But it could be. 2804 03:37:47,280 --> 03:37:54,660 But keep in mind that when you add a protected arrow, that green time has to come from somewhere, 2805 03:37:55,040 --> 03:37:56,940 and it would likely come from Olive. 2806 03:37:57,580 --> 03:37:59,940 Well, the one at Craig and Olive isn't very fast. 2807 03:38:00,420 --> 03:38:01,500 Well, that's probably what you'd be looking for. 2808 03:38:01,520 --> 03:38:04,380 It isn't very slow, and you've got a – 2809 03:38:04,380 --> 03:38:06,900 But at least it gives the left turners a chance to get out. 2810 03:38:07,420 --> 03:38:07,460 Yeah. 2811 03:38:07,840 --> 03:38:09,860 So that's still on the table. 2812 03:38:10,640 --> 03:38:13,640 There's a couple other things we're talking about about, too, and not that as well. 2813 03:38:13,640 --> 03:38:15,580 Thank you. 2814 03:38:15,580 --> 03:38:16,760 Other questions? 2815 03:38:20,660 --> 03:38:22,200 Thank you. 2816 03:38:22,740 --> 03:38:24,060 Go ahead. 2817 03:38:24,720 --> 03:38:25,280 Sure. 2818 03:38:26,220 --> 03:38:27,980 Where is it of him? 2819 03:38:28,880 --> 03:38:29,840 Yes, okay, go ahead. 2820 03:38:30,240 --> 03:38:35,880 The traffic study had an adder put in for future growth in Aeolia. 2821 03:38:36,340 --> 03:38:36,800 Yeah. 2822 03:38:36,980 --> 03:38:37,740 Aeolia traffic. 2823 03:38:38,080 --> 03:38:38,260 Yes. 2824 03:38:38,260 --> 03:38:45,980 It seemed to be often involved of an adorabt considering probably a couple of billion dollars 2825 03:38:45,980 --> 03:38:47,720 in development that's going to go down there. 2826 03:38:48,300 --> 03:38:54,580 So the added traffic was, from Olio, was just like it says, it was added to our background 2827 03:38:54,580 --> 03:38:58,440 traffic volumes and those were specifically the numbers that came from the approved traffic 2828 03:38:58,440 --> 03:39:00,400 study that was completed for that development. 2829 03:39:01,280 --> 03:39:04,560 So those numbers were added to the background traffic. 2830 03:39:04,560 --> 03:39:10,720 In addition to that, because we recognize that's probably not enough to incorporate all of the growth in the area. 2831 03:39:10,860 --> 03:39:19,180 So we also applied a half a percent per year growth rate to background traffic, in addition to the old. 2832 03:39:19,260 --> 03:39:28,860 You've just seen, well, not that I have any expertise to defend why I'm saying that, but just those are massive, 2833 03:39:28,860 --> 03:39:34,820 of two massive developments, one that's already been opened and one that's in process. 2834 03:39:35,960 --> 03:39:41,780 Again, we used the data from the previous study and that was directly imported into our analysis. 2835 03:39:45,660 --> 03:39:46,180 Thank you. 2836 03:39:46,520 --> 03:39:46,880 Thank you. 2837 03:39:47,120 --> 03:39:49,380 So I think we're past 9.30. 2838 03:39:50,680 --> 03:39:59,180 I'd like to propose that we open it up for a few comments and go until however many we can get until 10. 2839 03:40:00,240 --> 03:40:02,000 Is that work? 2840 03:40:02,300 --> 03:40:02,640 Perfect. 2841 03:40:03,500 --> 03:40:03,860 Yes. 2842 03:40:05,500 --> 03:40:05,920 Okay. 2843 03:40:06,340 --> 03:40:08,140 I agree. 2844 03:40:08,560 --> 03:40:08,760 Okay. 2845 03:40:09,020 --> 03:40:10,040 All right. 2846 03:40:10,120 --> 03:40:12,880 So I'm going to go ahead and open it up. 2847 03:40:13,060 --> 03:40:17,200 We're going to take as many as we can take until 10. 2848 03:40:17,520 --> 03:40:21,320 And then obviously we are not voting on anything tonight. 2849 03:40:21,720 --> 03:40:26,960 You've heard a lot of feedback from here as well as from the city. 2850 03:40:27,900 --> 03:40:39,840 So I would ask if you, if I call your name and you don't have something to share that hasn't come up, an issue that has not come up yet. 2851 03:40:40,220 --> 03:40:48,660 So you saw Bethany's area of discussion here because we don't need to reiterate everything that we've talked about, right, right now. 2852 03:40:48,660 --> 03:40:52,980 So it's in line with the goals of the comprehensive plan. 2853 03:40:53,620 --> 03:41:02,360 We know that we need to talk about density here that it's higher than what their plan calls for today. 2854 03:41:02,760 --> 03:41:06,140 We've talked about the retaining hall, the parking study here. 2855 03:41:06,280 --> 03:41:07,820 We know we need to do more in traffic. 2856 03:41:08,540 --> 03:41:16,060 So if I call your name and you, if you have something not already on our list, then I would ask you to come up. 2857 03:41:16,060 --> 03:41:21,920 But if it's already on our list, then let's make sure we get to the topics we haven't talked about yet tonight. 2858 03:41:22,160 --> 03:41:24,080 If that's okay, that's what I would ask. 2859 03:41:24,900 --> 03:41:29,980 So, Jim, Cornelson. 2860 03:41:31,440 --> 03:41:31,920 Jim. 2861 03:41:34,980 --> 03:41:35,460 Okay. 2862 03:41:37,260 --> 03:41:38,000 So if you could just. 2863 03:41:38,180 --> 03:41:42,240 If you could please state your name. 2864 03:41:42,240 --> 03:41:45,720 Jim Cornelsen, a ten-time manager. 2865 03:41:46,680 --> 03:41:52,180 I'm a retired civil engineer, and at one point in my career, 2866 03:41:52,880 --> 03:41:59,880 I was the vice president of marketing for a developer, those guys right there. 2867 03:42:00,380 --> 03:42:05,980 I was directing them as what they should do with this. 2868 03:42:06,520 --> 03:42:09,300 You've got two major problems in my opinion. 2869 03:42:09,300 --> 03:42:19,640 One is the density. It's been discussed. It's out of code, so it should not be approved. 2870 03:42:20,400 --> 03:42:26,700 You know, if you come to a board like this, then you need to pay attention to what the rules are. 2871 03:42:27,560 --> 03:42:31,140 You don't just disregard the rules and hope you can make it through. 2872 03:42:31,620 --> 03:42:33,780 That's not the way the game should be played. 2873 03:42:33,780 --> 03:42:43,860 The second is parking. Parking, I think, is probably the major problem. They said 2874 03:42:43,860 --> 03:42:51,820 they had 160 units, they're rounding up, and they had 250 parking places. The 2875 03:42:51,820 --> 03:42:58,300 problem with this whole concept is the development is geared for young adults. 2876 03:42:58,300 --> 03:43:07,760 let's say 25 to 35 somewhere in there. These are kids that have good incomes, most 2877 03:43:07,760 --> 03:43:13,860 of them, but they tend to save money because they're buying cars so they 2878 03:43:13,860 --> 03:43:22,080 would rather save money on housing. A lot of them live together. One bedroom units 2879 03:43:22,080 --> 03:43:33,120 got two people in it. So if you have 160 units and 50 of those units are married 2880 03:43:33,120 --> 03:43:41,120 couples then you're at 270 parking places and they're only saying 250. 2881 03:43:42,020 --> 03:43:50,700 We're already out of bounds. I've seen, I was amused at the parking studies. I had 2882 03:43:50,700 --> 03:43:55,400 in front of my desk on the day three parking studies for one project. 2883 03:43:56,240 --> 03:43:57,600 And I said, what is this? 2884 03:43:57,740 --> 03:44:00,600 And they said, you could just push data into it. 2885 03:44:00,880 --> 03:44:01,920 Computer prints it out. 2886 03:44:02,020 --> 03:44:04,320 That's the three, which wouldn't you want us to use. 2887 03:44:05,360 --> 03:44:08,220 And that's what's wrong with parking studies. 2888 03:44:08,400 --> 03:44:12,320 I have no idea what data went into that study, 2889 03:44:12,720 --> 03:44:16,820 but I bet it didn't include an apartment project 2890 03:44:16,820 --> 03:44:23,700 that was geared for young adults. And then that's just normal living day-to-day. 2891 03:44:24,360 --> 03:44:29,440 Try Friday and Saturday night when they're partying and everybody comes over. 2892 03:44:30,100 --> 03:44:34,240 Where are they going to park? There's no space for them. 2893 03:44:34,580 --> 03:44:41,780 And if you park in a retail place, our police force is going to be spending days getting out tickets. 2894 03:44:42,620 --> 03:44:49,680 there's no parking. This project, if it crossed my desk, I would never have 2895 03:44:49,680 --> 03:44:56,120 approved it because there's too many things wrong with it. Thank you. You want 2896 03:44:56,120 --> 03:44:59,860 to go to a group like this with so much 2897 03:45:00,110 --> 03:45:11,270 Almost perfect plan. If you have to have a parking plan, you're already in trouble. And you know you're in trouble, so you're going to try to find some way to fix it. 2898 03:45:11,790 --> 03:45:24,990 This project, had it crossed my desk, I would never approve for this piece of land. It might be good on a college campus, but not that piece of property. 2899 03:45:25,330 --> 03:45:25,730 Thank you. 2900 03:45:25,990 --> 03:45:26,350 Thank you. 2901 03:45:29,220 --> 03:45:30,000 Brett Berger. 2902 03:45:38,600 --> 03:45:42,860 Thanks, everybody. Good evening. My name is Brett Berger. I reside at 10 Winfield Point. 2903 03:45:43,480 --> 03:45:46,940 My wife Allison Berger resides at the same address. She's yielding her time to me, 2904 03:45:46,960 --> 03:45:50,720 but I'll try to be as quick as I can and skip anything that's been gone over. 2905 03:45:51,520 --> 03:45:56,280 I want to first mention that neighbors really do want responsible development. 2906 03:45:56,500 --> 03:45:58,640 At this corner, we want to see this corner improved. 2907 03:45:59,160 --> 03:46:02,200 We want something that enhances the neighborhood and compliments the city. 2908 03:46:03,000 --> 03:46:08,180 The proposal before us is simply too dense, too tall, and too dependent on changing zoning 2909 03:46:08,180 --> 03:46:08,880 to make it work. 2910 03:46:09,060 --> 03:46:11,540 Our goal is something more correctly sized. 2911 03:46:12,720 --> 03:46:14,280 This is the part that I want to mention. 2912 03:46:14,460 --> 03:46:19,340 There's some important context that explains why the proposal feels so out of balance. 2913 03:46:20,560 --> 03:46:25,340 This particular property has been owned and maintained by the same organization for 2914 03:46:25,340 --> 03:46:32,940 for many decades, one of the most successful real estate developers in St. Louis. 2915 03:46:33,240 --> 03:46:34,020 We're all familiar. 2916 03:46:35,260 --> 03:46:41,000 Over time, many decisions made by the ownership of this property directly shaped the condition 2917 03:46:41,000 --> 03:46:42,360 and the viability of the site. 2918 03:46:43,300 --> 03:46:47,080 Years ago, tenants in both buildings in North and the South were placed on month-to-month 2919 03:46:47,080 --> 03:46:53,060 leases, effectively preventing any tenants from making meaningful long-term improvements 2920 03:46:53,060 --> 03:46:59,480 commitments to the property. Eventually, all tenants were moved out of the North Building, as you know, and it was demolished. 2921 03:47:00,200 --> 03:47:04,700 And even today, active tenants like Tyneivis are not allowed long-term lease, they're on month-to-month. 2922 03:47:05,260 --> 03:47:14,880 So when we talk about the property being vacant, dilapidated, old, out-of-date, it's important to remember that that condition is not by accident. 2923 03:47:14,880 --> 03:47:19,800 It's current condition is the result of the deliberate ownership choices over many years. 2924 03:47:20,300 --> 03:47:23,120 It's an extremely expensive property. 2925 03:47:23,580 --> 03:47:30,640 They're asking a lot of money for this property and because the asking prices remained extraordinarily high over many years 2926 03:47:30,640 --> 03:47:35,460 and all of the previous requests for development, different local developers have reviewed 2927 03:47:35,460 --> 03:47:38,700 and they've passed on this particular site. 2928 03:47:38,820 --> 03:47:41,360 They evaluated what could reasonably be built here. 2929 03:47:41,360 --> 03:47:45,100 at a scale that would be appropriate surrounding single-family homes and 2930 03:47:45,100 --> 03:47:49,300 concluded that numbers simply didn't work. And that's the heart of the issue. 2931 03:47:50,200 --> 03:47:54,380 The proposed project is not high density because the property requires that to 2932 03:47:54,380 --> 03:48:00,160 thrive. It's high density because the land price demands it. When a property is 2933 03:48:00,160 --> 03:48:03,820 priced so aggressively that only an extreme zone-changing project can 2934 03:48:03,820 --> 03:48:07,140 make the math work, the pressure inevitably shifts to city and its 2935 03:48:08,080 --> 03:48:13,540 It shifts through zoning exceptions, increased density, and future requested public financial 2936 03:48:13,540 --> 03:48:14,100 assistance. 2937 03:48:14,460 --> 03:48:18,660 In fact, the developer has already noted and signaled on their website that they fully 2938 03:48:18,660 --> 03:48:23,080 expect to receive similar help to the Olea Village project assistance that they've received. 2939 03:48:23,420 --> 03:48:27,220 And I want to be clear, the developer has been really great in reaching out to the 2940 03:48:27,220 --> 03:48:29,760 neighborhood, reaching out and working with us. 2941 03:48:29,860 --> 03:48:30,940 They have been fantastic. 2942 03:48:32,060 --> 03:48:36,980 But the sites are so different comparing a 95 or almost 100-acre site to something 2943 03:48:36,980 --> 03:48:42,280 that's less than five acres, this particular site does not deserve or need the latitude 2944 03:48:42,280 --> 03:48:44,940 that a general commercial district requires. 2945 03:48:45,140 --> 03:48:45,860 It's just not appropriate. 2946 03:48:46,920 --> 03:48:51,680 Also, let's not forget that this particular property owner litigated and sued the city, 2947 03:48:52,320 --> 03:48:56,120 took the city to court all the way to the Missouri Supreme Court, in fact, and that 2948 03:48:56,120 --> 03:49:01,660 caused the city quite a bit of time and money after the city appropriately denied 2949 03:49:01,660 --> 03:49:05,440 their high value, high volume, very high volume convenience sort. 2950 03:49:06,580 --> 03:49:14,740 I have some concerns about where the heart of the ownership team is on this particular property, if it's in our best interest for the city or not. 2951 03:49:15,440 --> 03:49:23,520 So now we're being asked to update zoning and we'll be asked to provide tax incentive or abatements, just like Olea Village, to make this project viable on this property, which I think is not a fair pattern. 2952 03:49:24,440 --> 03:49:29,980 Residents should not have to subsidize the valuation that's out of alignment with what the site can reasonably support. 2953 03:49:29,980 --> 03:49:38,440 The city should not feel pressured to approve density levels that have not previously been allowed adjacent to single-family residential Creefcourt homes. 2954 03:49:39,620 --> 03:49:44,440 Definitely appreciate the developer's effort, softening the building along Grazier Road. 2955 03:49:44,520 --> 03:49:53,980 But even with that the step down, four stories is just too tall next to single-family Creefcourt homes, which would be the first such adjacency in decades that I'm aware of. 2956 03:49:54,660 --> 03:49:58,820 North Grazier and all tributary streets serve about 255 single-family homes. 2957 03:49:59,420 --> 03:50:05,960 Adding 157 on one end cap increases that density localized by nearly two-thirds in a single project. 2958 03:50:06,180 --> 03:50:11,420 It's insane. The proposed project is more than 12 times more dense than the adjacent homes. 2959 03:50:11,540 --> 03:50:16,400 The single-family homes right next to there in Martin Grove, one house on about a third of an acre. 2960 03:50:16,560 --> 03:50:18,900 So that's three homes per acre. 2961 03:50:19,260 --> 03:50:23,020 This is 12 or 13 times more dense than that. 2962 03:50:23,020 --> 03:50:26,520 That is not a gradual step up to higher density. 2963 03:50:26,680 --> 03:50:28,440 It's a shock to the system in the area. 2964 03:50:29,300 --> 03:50:33,360 Instead, neighbors want a development that's right-sized, not oversized. 2965 03:50:33,720 --> 03:50:36,880 Planning and zoning should vote no, no change of zoning. 2966 03:50:37,400 --> 03:50:41,440 A project at a reasonable scale still can succeed and revitalize this corner. 2967 03:50:41,660 --> 03:50:43,380 Neighbors want this property developed. 2968 03:50:43,540 --> 03:50:45,880 We want it improved, but it's got to be fair. 2969 03:50:46,100 --> 03:50:48,880 It's got to be sustainable, and it's got to stand on its own 2970 03:50:48,880 --> 03:50:51,700 without shifting the burden onto neighbors or the city. 2971 03:50:51,700 --> 03:50:54,300 Thank you so much. 2972 03:50:54,300 --> 03:50:54,780 Lynn 2973 03:50:58,840 --> 03:51:00,340 Barry. 2974 03:51:05,640 --> 03:51:05,920 Okay. 2975 03:51:07,140 --> 03:51:07,720 Okay. 2976 03:51:07,980 --> 03:51:08,380 Thank you, Lynn. 2977 03:51:09,500 --> 03:51:10,200 Cheryl Richards. 2978 03:51:23,640 --> 03:51:23,880 Hello. 2979 03:51:24,360 --> 03:51:30,640 The one thing that I don't think anyone has mentioned is the regulations that are going 2980 03:51:30,640 --> 03:51:33,460 to apply to the dog park and the swimming pool. 2981 03:51:34,000 --> 03:51:37,420 The dog park is supposed to be opening at five in the morning. 2982 03:51:37,420 --> 03:51:43,300 and the swimming pool is going to have amplified music until 9 p.m. at night. 2983 03:51:43,820 --> 03:51:50,960 So I'd like you all to really think about those regulations and whether they need to be adjusted. 2984 03:51:51,660 --> 03:51:58,440 The other thing is the code that they used for the restaurant for doing the parking study. 2985 03:51:58,760 --> 03:52:04,780 There are a whole bunch of different codes for different kinds of fast food restaurants, 2986 03:52:04,780 --> 03:52:11,700 And it seems like the one they chose was deliberately designed so that it didn't have a PM peak. 2987 03:52:12,240 --> 03:52:19,220 And so I think it would help to clarify exactly what kind of a restaurant they were going to put in next. 2988 03:52:19,580 --> 03:52:20,040 Thank you. 2989 03:52:20,180 --> 03:52:20,540 Thank you. 2990 03:52:23,260 --> 03:52:24,120 Bo Shi. 2991 03:52:30,800 --> 03:52:31,920 My name is Bo Shi. 2992 03:52:32,220 --> 03:52:34,380 I'm on 1-0-1-1-margin. 2993 03:52:36,040 --> 03:52:37,800 There's a particular point. 2994 03:52:37,800 --> 03:52:44,280 One mention is that the swimming pool is closer to my house than to their own building. 2995 03:52:44,920 --> 03:52:53,200 I believe they already said that it's in terms of – my following statement is focused on the supporting materials submitted for the application. 2996 03:52:54,340 --> 03:53:00,080 Those supporting materials are inaccurate, unfair, and biased in my opinion. 2997 03:53:00,080 --> 03:53:00,620 So. 2998 03:53:00,900 --> 03:53:01,720 Hang on. 2999 03:53:01,840 --> 03:53:02,440 She can't understand. 3000 03:53:03,260 --> 03:53:05,340 Can you recognize your mask, maybe? 3001 03:53:05,880 --> 03:53:07,420 I think it's difficult to understand. 3002 03:53:08,840 --> 03:53:10,260 Thank you, sir. 3003 03:53:10,780 --> 03:53:16,640 The plan failed to mention how its density is in contrast to the adjacent neighborhood 3004 03:53:16,640 --> 03:53:22,660 sub-divisions and how that high density will impact the overall density of the area. 3005 03:53:22,660 --> 03:53:30,060 In the density comparison, the apartment buildings used for the comparison are unfair. 3006 03:53:31,180 --> 03:53:38,660 The plan used Vanguard Heights for comparison, however, the plan ignored the fact that there 3007 03:53:38,660 --> 03:53:42,200 were no single family houses next to Vanguard Heights. 3008 03:53:43,040 --> 03:53:49,520 The plan also ignored the fact that Vanguard Heights is in a community center district 3009 03:53:49,520 --> 03:53:53,060 for the critical comprehensive plan. 3010 03:53:53,700 --> 03:53:56,540 The same kind of comparison was used on King's Landing, 3011 03:53:56,960 --> 03:53:59,880 which is a mixed use in innovation campus district. 3012 03:54:01,180 --> 03:54:03,900 While again, there was no single family housing 3013 03:54:03,900 --> 03:54:05,400 next to the end of apartment building. 3014 03:54:08,570 --> 03:54:11,130 The next, which is also another apartment 3015 03:54:11,130 --> 03:54:12,090 used for comparison, 3016 03:54:14,520 --> 03:54:15,920 but it's in a similar scenario. 3017 03:54:16,860 --> 03:54:19,720 So I think Brad already did the correct comparison. 3018 03:54:20,180 --> 03:54:21,260 I'm not going to repeat that. 3019 03:54:21,260 --> 03:54:26,800 But in the traffic study, again, the analysis is basically flawed. 3020 03:54:27,780 --> 03:54:35,680 So it shows that out of the 160 residents, only 40 go to work in the morning if you look 3021 03:54:35,680 --> 03:54:36,340 at the data close. 3022 03:54:36,820 --> 03:54:38,320 So this is my estimate. 3023 03:54:38,500 --> 03:54:43,080 I want to emphasize this is my estimate, but I believe I understand the number correctly. 3024 03:54:44,040 --> 03:54:49,220 So I have no doubt whoever did the calculations use the science. 3025 03:54:49,220 --> 03:54:51,780 But I thought they use the common sense. 3026 03:54:52,420 --> 03:55:00,220 So how do you know that only one out of four residents who pay $1,600 a month doesn't go to work? 3027 03:55:03,020 --> 03:55:08,100 Again, in the traffic study, the subject property is compared to only a village, 3028 03:55:08,760 --> 03:55:12,820 which is a much larger development project that's not completed yet. 3029 03:55:13,020 --> 03:55:14,720 So there's a lot of uncertainty there. 3030 03:55:17,940 --> 03:55:28,320 So I skip a lot of those, but to summarize what I said, the supporting materials for the application basically are flawed and biased. 3031 03:55:29,100 --> 03:55:29,320 Thank you. 3032 03:55:29,320 --> 03:55:29,500 Thank you. 3033 03:55:32,550 --> 03:55:33,790 Linda Resney. 3034 03:55:43,970 --> 03:55:51,890 Linda Resney, 104 Grazer-Agers. The developer has repeatedly proposed unsuitable plans for 3035 03:55:51,890 --> 03:55:58,990 the neighborhood. The East Isle of Comprehensive Plan was developed by demand of the people 3036 03:55:58,990 --> 03:56:03,730 in the neighborhood. It doesn't fit everything else that's going on in Crevecore, but this 3037 03:56:03,730 --> 03:56:09,790 is what the neighborhood wants. At hearings that we've had at the rec center, there 3038 03:56:09,790 --> 03:56:17,450 large articulate opposition that told the developer that this wasn't going to run and 3039 03:56:17,450 --> 03:56:22,910 the reasonings for their opposition were much stronger than the things that have already 3040 03:56:22,910 --> 03:56:24,470 been eliminated. 3041 03:56:26,690 --> 03:56:31,890 You can play with the numbers for the parking and the traffic all you want to justify a 3042 03:56:31,890 --> 03:56:32,150 goal. 3043 03:56:32,490 --> 03:56:34,030 But we will have to live with it. 3044 03:56:34,230 --> 03:56:38,550 It's not like a conditional use permit when if it proves to be a nuisance you 3045 03:56:38,550 --> 03:56:39,150 can refocus. 3046 03:56:39,150 --> 03:56:44,890 The number of cars will accelerate the gridlock on Olive and Grazer, and I have to live there. 3047 03:56:48,430 --> 03:56:59,350 This hulking, I'm sorry, this is a monstrous building, and this hulking building will require far more services from the city than the small amount of return and additional taxes. 3048 03:57:00,270 --> 03:57:04,670 If you want something like this, go to Olia, which brings up another point. 3049 03:57:04,670 --> 03:57:09,830 Creek Corps may want to follow Olivet in development, like the Oliver. 3050 03:57:10,730 --> 03:57:14,650 But you already have the view and the vanguard and now Olia. 3051 03:57:15,030 --> 03:57:20,990 At this time, this could be excessive for the market for the number of people who are available 3052 03:57:20,990 --> 03:57:23,190 in all of these buildings that are being built. 3053 03:57:23,910 --> 03:57:29,070 You might not be able to cite all of my reasons as a way to oppose this, 3054 03:57:29,470 --> 03:57:33,490 but you only need to deny the crazy parking scheme and that will stop this. 3055 03:57:33,490 --> 03:57:40,110 And thank you for the vote. We want the best now and for the long term. Thank you. 3056 03:57:40,290 --> 03:57:41,330 Thank you. 3057 03:57:44,400 --> 03:57:45,280 John McGuire. 3058 03:57:50,200 --> 03:57:52,280 And this will be the last one for tonight. 3059 03:57:53,920 --> 03:57:59,680 Thank you. I'm John McGuire. I live at 836 Mary Meadows Lane. I've been there 46 years. 3060 03:58:00,360 --> 03:58:04,500 But I want to specifically point out and keep the commission aware of, 3061 03:58:04,500 --> 03:58:10,840 His merry meadows is not only downhill, but more importantly downstream from this project. 3062 03:58:11,480 --> 03:58:15,340 And when the Martin Grove subdivision was built during the construction period, 3063 03:58:15,840 --> 03:58:22,800 they did not mitigate the water flow, and people in merry meadows wound up the six to eight inches of water in their basements. 3064 03:58:23,400 --> 03:58:30,880 So my request to the council committee is that you observe during the construction process and afterwards. 3065 03:58:30,880 --> 03:58:36,980 We've been assured that MSD will make sure the final project meets all the standards, 3066 03:58:37,760 --> 03:58:40,380 really requesting that you watch the construction process. 3067 03:58:40,860 --> 03:58:41,260 Thank you. 3068 03:58:41,360 --> 03:58:41,720 Thank you. 3069 03:58:42,420 --> 03:58:43,300 Thank you. 3070 03:58:43,620 --> 03:58:44,040 Thank you. 3071 03:58:46,610 --> 03:58:47,150 I'm sorry. 3072 03:58:47,390 --> 03:58:47,890 I'm sorry. 3073 03:58:48,710 --> 03:58:52,310 I mean, we were taking the papers as we've gone through. 3074 03:58:52,790 --> 03:58:54,170 And we're repping at 10. 3075 03:58:55,470 --> 03:58:56,150 I'm sorry. 3076 03:59:06,710 --> 03:59:09,810 I said when I stopped this, so you're going to need to come back 3077 03:59:09,810 --> 03:59:15,890 to the next meeting on January 20th and that's okay. Okay. Thank you. 3078 03:59:18,820 --> 03:59:20,060 Okay. Thank you, everyone. 3079 03:59:20,320 --> 03:59:25,340 I appreciate everyone's time this evening. I'm going to go ahead and we'll continue this 3080 03:59:25,340 --> 03:59:30,880 public hearing on January the 20th. I appreciate everyone sticking with us this late. 3081 03:59:35,340 --> 03:59:39,340 You guys, what would you like to see, are we there? 3082 03:59:40,900 --> 03:59:45,420 You said it was a very expensive property. 3083 03:59:45,640 --> 03:59:50,980 Hang on, we've adjourned this piece and we need to get it so we can adjourn. 3084 03:59:51,260 --> 03:59:51,720 That's okay. 3085 03:59:52,800 --> 03:59:53,240 Okay. 3086 03:59:53,480 --> 03:59:54,220 Okay, thank you. 3087 03:59:55,000 --> 03:59:55,260 All right. 3088 03:59:57,420 --> 03:59:58,960 Work Agenda. 3089 04:00:01,780 --> 04:00:11,880 Tending applications. Done for the first meeting in January. So these items will roll over to 3090 04:00:11,880 --> 04:00:19,800 January 20th. For both of these. Yeah, two items. Our deadline for that meeting is Friday. 3091 04:00:20,260 --> 04:00:27,480 Okay. So we may have this one, but right now we're not aware. Okay, correct. Can we adjourn 3092 04:00:27,480 --> 04:00:31,360 Department of Report? Okay. Meeting adjourned.