[0:11] Good evening. [0:11] I'd like to call the Village of Croton-on-Hudson Planning Board meeting [0:18] Croton-on-Hudson Planning Board meeting for Tuesday, [0:19] July 28th, 2026, to order. [0:21] We have A couple of items on our agenda, first being a new business item. [0:27] Carmel Riverside LLC, 425 South Riverside Avenue, applications for a special permit, [0:35] site plan approval, and a steep slope permit for a new 49-unit multifamily [0:41] permit for a new 49-unit multifamily building. [0:42] Um, I have a relationship with one of the principals in this, uh, application, uh, [0:49] who I have ongoing business with, uh, Mr. [0:53] Leggio, and therefore am recusing myself from the application and will turn over [0:59] the, uh, chairmanship of the meeting and the review of this application to our [1:06] Deputy Chairman, uh, Geoff Haynes. [1:09] So I'll be stepping down now, and I'll come back at the end of the meeting. [1:16] All right, so we respect Rob's decision. [1:19] Um, he is concerned about the integrity of the Village Planning Board and wants to [1:26] make sure there's no perception at all of, of any kind of favoritism. [1:31] So, um, we respect that. [1:33] Going to miss him greatly in this application, his expertise. Thank you, [1:39] application, his expertise. Thank you, John. [1:39] He's incredible. In fact, [1:41] he was named by Westchester Municipal Planning Federation the Planner of the [1:47] Planning Federation the Planner of the Year. [1:48] So his, his skills are great. We're going to miss him for this application. [1:54] So we're beginning tonight a long, long process. [1:58] Okay, the village residents are concerned that we give this a thorough review. [2:04] We're going to do that. [2:06] We're going to give this a thorough review, and that of course takes time. [2:12] There's a number of moving parts to this application, and it's fairly sprawling, [2:18] and we're going to be tracking each and every one of the loose ends to see that [2:25] every one of the loose ends to see that they [2:25] are fully evaluated. [2:27] The way this will play out over the next few weeks Tonight we're going to have a [2:33] period where we're— we have many questions for the applicants. [2:38] Those of you that have read the backup material that's provided on the website [2:44] material that's provided on the website will [2:45] see a report from our planning consultant that works for the village, NPV, [2:51] represented by Bo Brady over here, [2:53] that outlines 31 areas that Are pointed out as needing some additional [2:59] out as needing some additional clarification [3:00] or some additional information. [3:03] We also have some accompanying documentation on traffic studies and [3:08] documentation on traffic studies and school [3:08] enrollment impact and water and sewer impact and community benefits. [3:14] So there's a lot of supporting documentation that came with this. [3:19] This is you know a six-inch high. [3:22] Packet of information that the planning board gets for this. [3:27] So we're going to be going through that tonight, [3:30] asking questions about that supporting information, the traffic study, [3:36] the water and sewer hookups, etc. [3:39] This meeting tonight, just so everybody's aware, [3:43] is going to be a discussion with a developer where we have a lot of gaps. [3:49] In this application that we need clarified before we can go into a full presentation [3:55] of where everything's going to be laid out on the property, [4:00] how tall it's going to be, what color it's going to be, [4:04] where the car chargers are going to be. We're not there yet. [4:09] Where we are right now is with an application that that has a lot of gaps, [4:15] and until we have all that information in hand. [4:19] We're not ready to get a presentation from the developer. [4:24] With any luck, that information comes to us by the next meeting, [4:29] and we might be able to entertain a presentation at that point. [4:34] I know this might be news to you guys, but just want to explain to you that the— [4:40] what we see is the process going forward, be transparent about that. [4:46] This application includes a special permit. [4:49] And a site plan review, [4:51] 2 actions that the planning board has to take and 2 approvals or denials that the [4:58] planning board will be responsible for. [5:01] There'll be public hearings on both of those. Tonight is not a public hearing. [5:07] Tonight is going to be one-on-one with the applicant. [5:11] Bill Brady, our NPV planning consultant, will be going through point by point The, [5:18] uh, 31 areas that we need more information on. [5:22] And then planning board members will have a bunch of questions as well, [5:27] perhaps the village engineer, to flesh out the application. [5:32] So we're not at the point yet where we can get a presentation nor public comment [5:39] until we have a common set of facts that everybody understands what this project [5:45] entails. It's premature to start making points about it. [5:50] So let the process play out. [5:52] I know some of you came here wishing to speak, [5:55] but give us some time to do our due diligence. [5:59] Have some patience, and we will get a better application, [6:04] a better group of information for you to react to as a result of this. [6:09] Thank you. [6:11] Um, so that's kind of where— what I wanted to lay out. [6:14] Um, this is going to be several meetings. [6:17] There's, there's going to be a lot of loose ends to track down and follow [6:22] loose ends to track down and follow throughout [6:23] the meeting. There may be some zoning board variances that need to be pursued. [6:28] We'll find out about that tonight. [6:30] So there's a lot of things that are going to transpire. [6:34] Obviously, no decisions are going to be made tonight. [6:37] Nor anytime in the immediate future. [6:40] So just so everybody's aware, [6:42] this is something that the planning board is really going to weigh carefully and dig [6:47] into like we have. And, you know, rest assured, that's, [6:51] that's where we're going with this. [6:53] Anybody have anything else they'd like to add to this? [6:57] No. Do you want to have the attorney tee up some of what our protocols and [7:03] up some of what our protocols and abilities [7:04] are? Yeah. [7:06] So That's a good point, Steve. So what we'll do is we'll turn it over. [7:11] Introducing our team here: Bill Brady from MPV, Lori Lee Dickinson— Dixon, [7:16] I'm sorry— the village attorney, and Vincent Salanitro is our village engineer. [7:21] Karen Stapleton is our representative from the engineering department, [7:26] and planning board members who you have probably seen in previous meetings. [7:31] So we're going to be working with, [7:34] with the developer to To answer these questions and flesh it out. [7:38] And during the course of this process, the planning board cannot just say, no, [7:44] we don't like this, and vote no. [7:46] We've got certain criteria we have to weigh and some criteria we can't weigh. [7:51] So to kind of flesh some of that out, Lori, [7:54] if you don't mind giving people an overview of some of the things that the [8:00] overview of some of the things that the planning [8:00] board will be able to consider in this application. [8:04] Sure. And I think the concerns are specific to the special permit. [8:09] So of course, there's a site development plan that goes along with that. [8:15] But since this is the first application to be entirely within the purview of the [8:21] planning board, I thought maybe just to explain the process for a special permit, [8:27] a special use permit. And the, the criteria is clearly in the code. [8:33] I did an educational memorandum to you. It's not privileged and confidential. [8:39] It will be uploaded along with the rest of the documents. [8:43] It just explains what a special permit is, what it entails, [8:48] and the decision by the Village Board of Trustees to assign you with the primary [8:54] responsibility of the special use permit. [8:57] Thank you. [8:59] Was because of your unique qualifications and expertise in, um, these, [9:05] these planning aspects. [9:07] The Village Board of Trustees has enacted local legislation in your, [9:13] your village code which defines uses permitted as of right and indicates that [9:19] permitted as of right and indicates that in, [9:19] in your use tables, and also defines what uses are permitted by special permit. [9:26] So they've already predetermined by legislation that the use proposed is [9:32] legislation that the use proposed is permitted [9:33] in this zone, at this location, in this zone, [9:37] pursuant to additional conditions and additional criteria. [9:42] So, so you're not allowed as a planning board to legislate otherwise. [9:48] You can find by reviewing the criteria in the code, [9:52] and it's Article 10 of the Village Code, zoning code. [9:57] Article 10 in its complete current state is also included in the memo that I [10:04] provided and will be uploaded. [10:06] So you can see in its entirety the areas to be considered by the planning board. [10:13] And the applicant is aware of the responsibilities to meet the minimum [10:19] responsibilities to meet the minimum requirements. [10:20] And the project, once it's determined to be the project and presented publicly, [10:27] will then have an opportunity— [10:30] you'll have an opportunity to look at the project as proposed and to determine what [10:37] additional information you may require, [10:40] what other records or evidence that you need. [10:44] And again, you'll need to find substantial evidence in the record to either approve [10:51] it, approve it with conditions, or deny it in its entirety. [10:56] But that substantial evidence must be present. in your record. [11:02] Your record is the development starting with this initial conversation and [11:08] continuing throughout the public hearing process. [11:12] This project, once it's ready in answering all of the necessary information that may [11:20] or may not be missing from the, the plans that you have in front of you, [11:26] will need to go to the county planning board for review and comment before you [11:33] board for review and comment before you can [11:33] reach a decision. And also, under the code provision as adopted recently, [11:39] will need to be transmitted to the Board of Trustees for consideration as to [11:46] providing you with comments. So that's a 30-day process. [11:51] The, the project, having appeared this evening on your agenda, [11:56] can now be placed on a Board of Trustees agenda, [12:00] and the 30 days will run from the date of that meeting. [12:05] So you do have time to obtain more information from the developer, [12:10] a set of revised plans if appropriate, under the planning— [12:15] your planning consultant's recommendations. [12:19] And then you'll have time to consider comments you may receive from the county. [12:26] Again, that's a 30-day requirement and comments you may receive from the Board of [12:33] Trustees. [12:34] Mm-hmm. [12:34] Again, the criteria is clearly set forth in the code, and you are limited. [12:40] If, if you can determine that those factors and that criteria is met through [12:47] evidence provided by the developer, then you can approve this, [12:52] approve it with conditions, [12:54] or if you feel that it hasn't met the necessary criteria based upon substantial [13:00] evidence in the record, You can deny it in its entirety. So that's the limitation. [13:07] You can't legislate it and say this use is not appropriate because the Board of [13:14] Trustees has already determined this use is permitted by special permit in this [13:20] zoning district. [13:22] Okay, thank you. So there's obviously some time ahead of us for things to be [13:27] investigated. Tonight, as I mentioned, [13:30] we'll have the collaborative discussion with the developer where Bill Brady is [13:36] with the developer where Bill Brady is going [13:36] to walk through the memo that mentions the gaps that we saw in the application so [13:42] that perhaps next meeting we can come back and have an application that's closer to [13:49] being complete and we can move on from there. [13:52] So perhaps, Andrew, if you want to come up to the Microphone, bring your team up, [13:58] introduce everybody, and, um, we'll— I'll turn it over to Bill to walk through, um, [14:04] his questions. [14:05] Thank you, thank you. Uh, good evening, my name is Andrew Cortese. [14:10] Um, I'm the applicant of Carmel Riverside LLC. [14:14] I have my managing partner here, Robert Leggio. [14:17] Um, we're here to present our multi- Family project. A little bit about myself. [14:23] I've been doing development, [14:25] real estate development and construction for the last 30 years within Westchester [14:31] County, from typically, most likely through the real estate, [14:35] through the river towns from Yonkers all the way up to Peekskill. [14:40] We, within the 30 years, we acquired some property and we hold it in our portfolio. [14:46] Thank you. [14:47] And we manage it as well. So typically we build and manage our own projects. [14:52] So that's what we're looking to do here. We take pride in our work. [14:56] And a little bit about this project, we purchased it, myself and my partner, [15:01] probably 2 and a half years ago. There were some violations on the property. [15:06] We cleaned those up. There were some tenants there. [15:09] We kind of— they're still there as well right now. [15:12] We were We were transparent with our goals to redevelop the property, um, [15:17] so they were well aware that we are looking to do that. [15:22] Um, and— [15:24] oh, sorry, sorry. [15:26] There you go. Thank you. [15:30] So yeah, we're well— you know, the, [15:32] the tenants are well aware that we're looking to redevelop the property. [15:36] We've been transparent with them, [15:38] and we look forward to working with your board board, uh, [15:41] in the future for this development here. [15:45] Thank you. Um, just a few words. Good evening, Deputy Chair, board members, [15:50] evening, Deputy Chair, board members, staff. [15:50] My name is Jacob Amir from Zarin and Steinmetz. [15:53] Our firm is the attorney on the project, and, um, I, [15:57] I just want to kind of supplement very briefly— [16:00] I'm not going to take up too much time— what you opened with, and, [16:05] and that this is a Serious, long— we hope not too long, but, but a serious process. [16:10] And, and I'm, I'm happy that the members of the community are here behind us, [16:15] this table, to hear this project from the, from the outset, [16:20] because I think it's important from the beginning to get a good perspective of [16:25] beginning to get a good perspective of what [16:25] the project is. It's much easier to go through it that way. [16:29] And, and we look forward to hearing Mr. [16:32] Brady's And your village consultant's comments. [16:35] A few seconds just overall so everybody hears what, what this is. [16:39] So the project proposes the development of a building with 49 units, [16:44] a combination of 1 and 2-bedroom units, [16:47] I believe 79 parking spaces including 5 handicapped spaces, 5 affordable units, [16:52] e-bike, bike storage, various amenities and improvements. [16:56] Your planning consultant has identified this as a Type 2 action under SEQR. [17:01] There are variances that are required, [17:04] so we will be asking your board to refer to the zoning board so that we can proceed [17:09] with that. But again, [17:11] what's important to especially note for the people behind Andrew and me is that it [17:16] doesn't obviously end with the zoning board. [17:19] That is just one small, relatively Speaking component of this. [17:24] It will go back to this, to this board for, for site plan and special use permit, [17:29] as you had mentioned before. [17:31] I want to just sort of introduce very quickly, [17:34] and then we're going to turn it over to the consulting team because there's a lot [17:40] the consulting team because there's a lot of [17:40] info to get through, who's here. [17:42] And the reason why I want to introduce is because you said there are components [17:47] here. There's stormwater and lighting and landscaping. Yes. [17:51] And traffic flow and school impact. [17:54] So I think all of that needs to be addressed at the outset, [17:58] not just because we want to show off that we have a project that's really great for [18:03] the village, but that the team has gone through great efforts to try to get us [18:09] through great efforts to try to get us here. [18:09] There's a lot to put in, but that's— it's important to lay out. [18:13] Lou Demasi of Demasi Architects is going to go through architectural plans to the [18:19] extent We're able— Jim Annichiarico from Cronin Engineering and Michael [18:24] Mastrogiacomo from Mastrogiacomo Engineering are going to handle [18:28] Engineering are going to handle engineering aspects [18:29] of the project. Robert Sherwood is going to talk to you about some landscaping, [18:35] and Paul Vernon and Tars Schroff of Kimley Horn are going to talk to you about some [18:40] fiscal issues, school impact or non-impact, and traffic memo. [18:45] So Hopefully we get a wide scope on this meeting, and then we intend to [18:49] meeting, and then we intend to incorporate, [18:50] um, your planning consultant's comments into a further submission. [18:55] So as we go through this process, [18:57] the issues and the open points become less and less and less and less till we get to [19:03] a place where your board is comfortable with the site plan and special use permit. [19:08] Okay, that's great. Thank you. [19:10] Just to add one more piece of detail, To explain some of the process, [19:14] we do anticipate that we will use an issues actions tracking sheet to keep [19:19] issues actions tracking sheet to keep track of [19:20] all the loose ends that we have in this project, [19:23] things that we may be asking you to come back with. [19:26] And it would just be a central document, you know, [19:29] a single source of truth that we would share with you and— And the public. [19:33] And the public, yeah. It's going to be part of the public meeting backup. [19:38] And it would show what the loose ends are, who's responsible, [19:42] and the promised delivery date of those things. [19:45] It's just common, you know, project management tracking type mechanism. [19:49] So that'll be incorporated into, into this process as well. [19:53] So I imagine the points that Bill's bringing up tonight will fall into that [19:58] bringing up tonight will fall into that sheet. [19:58] Some additional ones that the group here comes up with tonight would fall into that [20:03] sheet. [20:03] That'll be great. It keeps us on our, on our toes. With the checklist. [20:07] So that's, that's, that's great. Sure. [20:10] Do you want to take— want Lou to step in? [20:12] All right. So with that, I think— [20:15] Again, Mr., Mr. Acting Chair, just so we're clear, [20:19] the board isn't necessarily interested in taking a full-blown presentation [20:26] tonight. I think that they're interested clearly in The elements that the [20:32] planning consultant has, has indicated. [20:36] So maybe instead of taking the experts' presentations on the project, [20:42] you can start by just having that review in public of the items that the [20:49] planning consultants have determined may be missing from this. [20:54] And also the planning board seeking clarifications on some of the questions [21:01] clarifications on some of the questions and [21:02] comments Yeah, exactly. [21:04] I mean, that's, that's the intention for tonight. [21:07] It would not be a full-blown presentation. [21:10] Glad you guys have your subject matter experts on hand. [21:13] They may be able to help fill in some gaps that Bill raises. [21:17] So we could use them for, for that part of it. [21:20] So with that, Bill, if you want to run down the list. [21:24] Thank you very much, Chairman. [21:25] Again, as you noted, our memo was in the materials that are online, [21:29] and if you want to review those, you'll kind of can play along. [21:33] Um, we put together this memo to kind of also give the board and the public [21:38] background on what can appear complicated. [21:40] There's a lot of different pieces to the things that need— [21:44] this board's going to be approving. So get nice and closer. [21:47] Thank you. [21:49] And reviewing. And it's a good opportunity for the applicant to understand kind of [21:54] going and all be on the same page as we've discussed on the various pieces. [21:59] And again, this is our initial review of— again, [22:02] we'll get into some of the general and procedural comments that we've pulled [22:07] together. As has already been said, [22:09] the board is going to be looking at this for a site plan approval by the planning [22:14] board, and a public hearing will be conducted by the planning board for site [22:19] conducted by the planning board for site plan [22:19] approval. The planning board will also be reviewing this, [22:23] as the attorney also mentioned, for special permit approval. [22:27] It requires a special permit by— from the planning board, [22:30] and a public hearing will also be conducted by the planning board for the [22:35] conducted by the planning board for the special [22:36] permit. As already mentioned too, [22:38] this application is categorized as qualifying exemption under the New York [22:42] qualifying exemption under the New York State [22:43] Environmental Conservation Law. [22:45] No further SEQR action is required for this application. [22:48] Thank you. [22:49] That doesn't mean that this board will not be looking at the many, [22:53] many environmental impacts of this project, though. [22:57] As already mentioned, this project will be— [23:00] the application referred to Westchester County Department of Planning, [23:04] Westchester County, due to its— due to the special use permit. [23:08] There are also additional local land use permits. [23:12] We list them in here, everything from A deep slope permit, a tree removal permit, [23:17] and an excavation and filling permit. [23:19] We've requested that the application— [23:22] that the applicants submit those application materials to the village as we [23:27] application materials to the village as we go [23:27] further along. I think it's also mentioned that this application not only is in the [23:33] C-2 commercial district— C-2 general commercial district— it's also located in [23:38] commercial district— it's also located in the— [23:38] Sorry, the Harmon South Riverside Gateway Overlay Zoning District. [23:42] So it's got, it's got its underlying zoning, the C-2, and also the, uh, [23:47] HSRG Overlay Zoning District. [23:49] So we'll get into some of those details on those 2 districts. [23:53] Um, we note that the, um, [23:55] we've outlined what we believe are potential zoning variances that the [24:00] potential zoning variances that the application [24:00] would be would require based on the current submission, [24:04] and we request some additional information as we go through some of these specific [24:09] variances that would, again, as mentioned, [24:12] would have to go through the Zoning Board of Appeals. [24:16] We note that the— per the zoning code, [24:18] the maximum floor area ratio shall be 0.8 And the applicant needs to provide an [24:24] exact calculation so that we all understand what floor area ratio is [24:28] understand what floor area ratio is proposed for [24:29] this project. The next one is regarding the height of the project. [24:33] The maximum height is 35 feet. [24:35] In addition, the— for buildings located in their entirety more than 5 feet from the [24:41] street line, the height in feet and in stories shall be established by the [24:46] stories shall be established by the village [24:46] engineer in such a way that no building shall be prevented from attaining at least [24:52] at one point the maximum height permitted in the district in which such building is [24:57] proposed to be erected, [24:59] such height to be measured above the elevation of the pre-construction grade [25:04] abutting such building at this point. [25:06] We noted that in the site plan drawings, we need to see— [25:10] they need to provide that the calculations regarding the height of the building [25:15] relation to the site is And those will be provided to the village engineer for his [25:21] review. Also, another variance is that we note that the front yard setback does not [25:26] comply with for the C2 zoning district and for lots within 25 feet of a residential [25:32] district boundary. So a variance will be required related to that setback, [25:37] and the front yard setback does not comply with the HSRG overlay zoning district. [25:42] A variance from the Zoning Board of Appeals will be required. [25:46] So regarding parking, um, in the code specifically says, [25:50] notwithstanding any other provisions of the code, [25:53] for mixed-use and multi-family residential buildings in that HSRG gateway overlay [25:59] area, there shall be provided at least the following amount of parking for each [26:04] residential dwelling unit: [26:06] 1 parking space plus 1 additional parking space for each bedroom in the unit in [26:11] excess of 1 bedroom. [26:12] And we say, for example, studio apartment, 1 space; 1-bedroom apartment, 1 space; [26:18] 2-bedroom apartment, 2 spaces. [26:20] So the proposed project will, will meet the minimum parking requirements, [26:24] but the zoning table has the wrong calculation for the required parking. [26:29] Again, the applicant will give the correct information and provide that to the [26:34] board. So then we get into the area and bulk Regulations relating to the maximum [26:40] building square footage. [26:41] The code says, with the exception of lots within the C-2 zoning district and the [26:47] Municipal Place gateway area fronting on Municipal Place, [26:51] the maximum permissible square footage for any single building should not exceed [26:56] 20,000 square feet. It appears that the building will be larger than 20,000 square [27:01] feet, so a variance from the ZBA will be required. [27:05] And we are asking that the applicant confirm the building's total square [27:09] confirm the building's total square footage. [27:10] So now we're going to get into some of the design regulations, [27:14] and this has to do with off-street parking placement and design. [27:18] The code states that all the parking shall be located along the side and in the rear [27:24] of buildings unless the applicant demonstrates to the planning board that [27:29] demonstrates to the planning board that site or [27:29] business constraints prevent conformance with this requirement. [27:34] The proposed project does not meet this requirement. [27:37] And we are requesting that the applicant provide more information whether or not [27:42] they're going to be seeking a waiver from the planning board for that requirement. [27:48] Another requirement is related to curb cuts and sidewalks. [27:52] Quote, properties within the gateway area shall be permitted a maximum of one [27:57] vehicular curb cut per lot per street frontage unless the property owner can [28:02] demonstrate the planning board that this standard cannot be achieved or is not [28:07] appropriate to the specific site. [28:09] And the project does not meet this requirement, [28:12] and we're asking the applicant to seek a waiver from the Planning Board related to [28:18] that curb cut and sidewalk requirement. [28:20] Another requirement related to open space, quote, [28:24] to enhance the appearance of the gateway areas and contribute to Croton's open [28:29] areas and contribute to Croton's open space [28:29] character, a minimum, a minimum of 15% of the lot shall be set aside as open space. [28:35] Applicants will be required to submit a landscape plan as part of the site plan [28:40] application. [28:41] Thank you. [28:42] The applicant has submitted a landscape plan, [28:45] but additional information is needed to determine if the project complies with [28:50] determine if the project complies with this [28:50] section. If any of the components do not comply, [28:53] the applicant will need to either seek a variance from the ZBA or a waiver from the [28:58] planning board. So then, related to signage, [29:00] all signs in the Gateway District must conform to the village's signage [29:05] conform to the village's signage regulations. [29:05] In addition, no sign in the Gateway District shall exceed 48 square feet in [29:10] District shall exceed 48 square feet in area. [29:10] And the application— the applicant will be— [29:13] would— [29:14] is required to provide more information if they're going to be having any signs at [29:19] the proposed site, and again, the sizes of those signs. [29:23] Regarding lighting, a lighting and photometric plan is required at the time [29:27] photometric plan is required at the time of site [29:28] plan application. That has not been submitted, and the application— [29:32] the applicant should provide this to confirm that the lighting plans will meet [29:37] confirm that the lighting plans will meet the [29:37] requirements of the lighting section of the code. So more about parking. [29:41] Regarding the size of the parking spaces, [29:44] 300 square feet shall be considered one parking space, [29:47] and it's to provide room for standing area and aisles for maneuvering. [29:52] The applicant should provide parking dimensions on the site plan to confirm the [29:56] proposed project meets the zoning regulations for that requirement. [30:01] Related to access, Unobstructed access to and from a street shall be provided. [30:05] Such access shall consist of at least one 10-foot lane for parking areas with less [30:10] than 20 spaces and at least two 10-foot lanes for parking areas with 20 or more [30:15] spaces. So the applicant is requested to provide the parking aisle and access [30:20] dimensions on the site plan to confirm that the project meets those zoning [30:25] requirements. We get into another list of Regulations, more regulations. [30:29] The project will need to meet— we discussed this before— [30:32] the project will need to meet the regulations related to the village's [30:37] regulations related to the village's affordable [30:37] housing requirements. [30:39] This project, the planning board will need to make a determination regarding the [30:44] reservation of parkland. [30:45] So the planning board will determine whether a proper case exists for requiring [30:50] whether a proper case exists for requiring such [30:50] land reservation in accordance with the code. [30:53] Related to the village's local waterfront revitalization consistency, [30:57] the board will need to make it its consistency determine— [31:01] determination with the village's LWRP as part of its final site plan approval, [31:06] and the applicant has provided a coastal consistency form. [31:09] The project will need to conform to the village's requirements for stormwater [31:14] pollution prevention. [31:15] They'll need to provide a plan for that, [31:18] but because the site is greater than 1 acre, [31:20] a stormwater pollution plan will be required. [31:23] Thank you. [31:24] The site— excuse me— [31:26] falls within the Indian Brook Croton Gorge overlay and must meet the performance [31:31] criteria of those— of that part of the code. [31:34] The applicant should provide a narrative on how the project will meet the criteria [31:39] of that overlay. So we also— [31:41] that's just the background on all the different approvals and requirements of [31:46] different approvals and requirements of this [31:46] project. We then took a look at the site plan and we had the following comments [31:51] regarding the landscaping plan. [31:53] We recommended that the applicant provide an irrigation plan for all the new [31:58] plantings, plantings, [32:00] and can please confirm that the rear plantings will not be in constant shade, [32:05] and if so, select another species, [32:07] and also provide information on how the rear area of the project will be [32:12] rear area of the project will be maintained. [32:13] We had a comment on the retaining walls. [32:15] We note that 3 tiers of retaining walls are proposed for with the site plan. [32:20] Additional details on the construction of the walls should be provided. [32:25] We're requesting whether or not geotechnical studies have been conducted [32:30] geotechnical studies have been conducted on the [32:30] stability of the slopes. [32:32] The planning board may want to consider having a structural engineer review those [32:37] structural plans related to water and sewer and the capacity of those utilities [32:42] sewer and the capacity of those utilities in [32:42] the area. So in accordance to the— with the code, [32:46] the location of all proposed water lines, valves, [32:49] and hydrants And of all sewer lines with profiles should be provided indicating [32:54] connections with existing lines or alternative means of water supply or [32:59] alternative means of water supply or sewage [32:59] disposal and treatment. [33:01] Again, related to stormwater, related— [33:03] the code requires that a stormwater pollution prevention plan— [33:07] we discussed this already— shall be required for any site development plan, [33:12] and that it will need to be submitted. Still needs to be submitted. [33:16] Tree removal— related to tree removal, [33:19] the code requires that a tree removal plan be provided. [33:23] Related to blasting or rock removal, [33:25] we are requesting information on whether blasting or rock removal will be happening [33:30] at the site, and if so, what mechanism is proposed to remove the rock. [33:35] Related to emergency access, [33:37] we noted that one of the plans do include include a fire truck access plan, [33:42] but it still needs to show the ability for a fire truck to access the garage or show [33:47] adequate maneuvering space. [33:49] And we were requesting that they discuss whether or not the project meets the New [33:54] York State Building Code fire access requirements, [33:58] and a turning diagram on the proposed site should be provided. [34:02] We also recommend that the planning board refer this application to the village fire [34:07] department for their review and Related to visual impacts and elevations, [34:12] architectural elevations have been provided, [34:15] but no context montage is included as required by code. [34:19] A context montage, a streetscape montage that shows adjacent buildings within 200 [34:24] feet of the proposed building, is required, [34:27] and the applicant should provide photo simulations of the project in the context [34:32] simulations of the project in the context of [34:32] the surrounding properties. [34:34] In addition, we ask that they provide rear elevations of the proposed building and [34:39] its retaining walls. [34:41] Regarding lighting, a lighting diagram is required that shows the areas of [34:45] illumination. The code requires that the proposed location, direction, power, [34:51] and time— the timing of the proposed outdoor lighting is provided by means of [34:56] outdoor lighting is provided by means of data [34:56] details and an illumination contour plan. [34:59] Which shows that lighting equal to or greater than 1/2 footcandle will not splay [35:04] greater than 1/2 footcandle will not splay off [35:04] the site as required. We get into— we discussed trash collection. [35:08] So we note that the trash storage and removal appear to be located at the garage [35:14] door or refuge area shown on the plans, [35:16] but the garbage truck can only back into the site, [35:19] blocking the driveway and the sidewalk. [35:22] Additionally, in the preliminary set of The first floor plan, [35:26] a trash room is shown adjacent to the refuge area without an internal [35:30] refuge area without an internal connection. [35:31] So we're asking that the applicant clarify the proposed trash collection process. [35:37] Also, the garbage truck turning diagram shows that the truck must back into the [35:42] shows that the truck must back into the site [35:42] from South Riverside Avenue, blocking the driveway and the proposed sidewalk. [35:47] And we're requesting that they discuss how often the trash will be picked up. [35:52] And also, all dumpsters and refuge storage areas shall be fully screened from the [35:57] street and adjacent properties as per the code. [36:01] We discussed the proposed walkway that was shown on the, on the drawings. [36:05] The applicant will discuss a little bit more of that and whether or not there will [36:11] be an entrance to the building through the walkway on site. [36:15] Delivery and loading area, we are asking for more information on delivery vehicles, [36:20] uh, where, where they will be, what area that will be located, uh, [36:24] whether or not there's a loading or delivery vehicle zone. [36:28] And if so, we're requesting that they mark that on the site plan. [36:32] Um, the code also requires a construction, a construction management plan. [36:37] And in those, in that management plan, [36:40] the applicant will be also providing information on phasing and staging during [36:45] construction, duration of construction Truck traffic during construction, [36:50] construction noise, and construction dust. [36:53] So in that construction management plan, they're required to provide that. [36:57] So it's a long list, and again, we're at the beginning, [37:01] but they have a lot to get back to us. Thank you very much, Chairman. [37:06] Thanks, Bill. It's really complete. I really appreciate all your hard work on [37:10] really appreciate all your hard work on that. [37:11] So I'm assuming you guys will come back with something in the next meeting, [37:15] something in writing, give you time to digest this. [37:18] Meanwhile, while we're here together, do you have any initial questions, feedback, [37:23] comments on what you heard so far? [37:26] So, no, we don't have any comments per se. [37:29] We want to second that we appreciate the thorough memo. [37:33] This is a great roadmap for us, so it's very, very helpful. [37:38] I don't know if— look, we have our team here. [37:41] It may be helpful for them to just give a little bit of their thoughts on the [37:47] project, at least aspects of the project. [37:50] We don't want to be long-winded, but at least since everyone's here, [37:56] have them come up and just give some sort of facets of it to put into context what [38:02] we just heard from Mr. Brady. [38:04] Yeah, no, I mean, we don't have a complete application at this point, [38:09] and I think it might be premature to Bring people up and start talking about the [38:13] project. Unfortunately, you assembled your team for this, and you know, [38:18] sorry that they're here and not able to speak. [38:20] But really want to keep the focus on these outstanding issues. [38:24] Get a complete application together. [38:26] I think that'll facilitate the project more than anything else. [38:30] We come back; we all got a common set of facts to deal with. [38:33] We all know what needs to be done. [38:35] So that's kind of how I was hoping we would we would proceed tonight. [38:40] And also because there are so many questions on here, [38:44] adding or subtracting from the list of variances, that's, you know, [38:50] a very essential question that should be answered. [38:54] Some of the missing items and details and information may impact your ability to [39:00] refer this at some point because you're not really sure what variances they're [39:07] seeking and what needs to be sought and whether, you know, [39:11] they're aware of the extent that the project didn't meet the code. [39:17] And if, you know, they have members of their team that can speak to one or more [39:23] their team that can speak to one or more of [39:23] the comments, the architectural comments or the site plan comments or the— you [39:29] or the site plan comments or the— you know, [39:30] it's, it's important for you to— And the public. [39:34] To have a project that is as complete as possible and ready for public comment, [39:40] ready for referrals, ready for, you know, [39:43] the necessary distributions under the general municipal law, et cetera. So I [39:49] general municipal law, et cetera. So I don't— [39:50] Thanks. [39:50] I don't know if there's any clarification that your team members [39:56] might have available. [39:57] I, you know, I realize that, yeah, it's very short notice, but, um, [40:03] you can see from 7 pages it's, it's pretty thorough. [40:08] So let me just, let me just comment. [40:10] So there are— we would like, if it's possible, to, [40:13] to get the referral to the zoning board. [40:15] And the reason why I'm going back to that is there are, [40:19] there are a couple of variances that we're clearly going to need that are not going [40:24] change as we go through this, you know, setback, for instance. [40:27] I think, I think Robert Sherwood, if he can, [40:30] can probably talk about the open space because that I know is one item that may [40:35] because that I know is one item that may be [40:35] up in the air as to whether we need a variance, whether we're asking for a [40:39] variance, whether we're asking for a waiver. [40:40] So if it's possible, if, you know, if we could just touch on that, on that one, [40:45] because if that is somewhat satisfying to you this evening. [40:48] I'm hopeful that we can get the referral to the zoning board. [40:52] And look, just to be open, it's on the applicant to get a full variance request, [40:57] right? If we go to the zoning board with a request for 2 or 3 variances and we [41:01] needed 4, let's say it's hypothetical, we're just wasting our own— I mean, [41:06] wasting your time, but we're wasting our own time. [41:09] We're going to go through this process. [41:11] So the onus is on us to make as complete a variance request as possible. [41:15] Otherwise, we're going to have to go back there, which is why I, I would— [41:20] I'm hopeful we can get that process started now. [41:23] But if, if it's okay, if we can speak to the open space item. [41:26] Yeah, I mean, if, if we stick our comments strictly to the [41:30] questions that were raised, uh, your responses, um, [41:34] we can entertain that. [41:35] Okay. [41:42] Okay, but Jeff, just point of reference, um, [41:47] my own opinion is that I don't— is this on? [41:52] Yeah. [41:53] I don't want to be sending stuff, just as, um, the attorney just said, [41:57] I don't want to be sending stuff to the zoning board piecemeal. [42:00] And I don't want to— [42:01] I don't want to submit anything to the zoning board until the application's [42:05] zoning board until the application's complete [42:06] to our Yeah, that's all. [42:08] Yeah, we just, we just conversed. I think that, that makes sense. [42:11] We— let's supplement what we have. And at the next meeting, okay. [42:15] I think that's the most efficient way to handle it. [42:19] If per chance the project will be amended or in some way changed as a result of the [42:26] need for this significant number of variances or whether other variances are [42:33] necessary. It would be important to get the actual project as proposed. [42:39] And certainly, the inability to get variances would foreclose the opportunity [42:46] variances would foreclose the opportunity to [42:46] come back here to proceed. [42:48] So you do want to make sure that there's coordination and that the project is ready [42:55] for a public presentation, as you know, is routinely intended for the first meeting. [43:02] But in speaking with the acting chair and the board members earlier this evening, [43:09] in light of the significance and this list, both site plan and special permit, [43:16] we thought it best to provide you the opportunity to supplement to the point [43:23] opportunity to supplement to the point where [43:23] you can make that presentation and the public can be satisfied that this is what [43:30] you're proposing, right? [43:32] Yeah. So just a couple of housekeeping items then, since, since we'll go that [43:38] items then, since, since we'll go that way. [43:38] One is, are the notices to the related agencies and county, [43:42] is that going to be held in abeyance till the next meeting? Or is that the time? [43:48] Is that going out now? [43:49] So there's a notice that goes to Westchester County Planning Board. [43:53] But I don't think that goes to them until we declare, uh, declare a public hearing. [43:58] So I think that, that wouldn't start— we— [44:01] that we wouldn't send it to the West Chester Department of Planning until we [44:05] Chester Department of Planning until we declare [44:06] when the public hearing is going to be on this matter. [44:09] Okay. [44:10] Um, I, I'm not aware of what the procedure process is, so it does— it, [44:16] it really is incumbent for this to be ready for public Before it's [44:21] distributed. I know that the code also requires the transmittal, [44:27] and the Board of Trustees, once they add it to their agenda— [44:32] and they have an agenda upcoming, Len? [44:35] August 19th. [44:36] August 19th. Thank you. What day is it? August 19th. [44:40] It will appear on their agenda and give them the opportunity, [44:44] and the 30 days will run from the date that it appears on their agenda as well. [44:50] So I guess I'm, you know, I've known you a long time, Jacob. I'm just— [44:55] Yep. [44:55] I want to encourage— and Mr. [44:58] Cortese, I've advised on other projects at other communities that you were [45:04] developing. I just want to make sure that this is the project. [45:09] And with so many things missing and being suggested to be added. [45:14] I think it would be helpful for the public to know what the project is. [45:20] So that makes sense. [45:21] So just, just in, in terms of chronology based upon that, [45:25] so if we're coming back to this board's next meeting, obviously assuming we, [45:30] we have all our ducks in order, um, I know the, the memo from the, uh, [45:34] planning consultant was— came out, I think, on the 24th. [45:38] So we had to go through that right after that. [45:41] I don't know if there's a timing on— [45:43] assuming we get everything that we're going to get, I mean, [45:47] it's on us to do that as quickly as possible. [45:50] Is there a timing on when the consultant can return a memo? [45:54] And also, will the next meeting be a public meeting? [45:57] Will it be open to the public, a public hearing? [46:00] Likely not a public hearing, but Vince, [46:02] if you want to talk about the submission of documents and the deadline to submit [46:06] documents before the next meeting. [46:09] It's usually 15 days before the meeting. [46:11] We have 2 meetings per month. [46:13] We have a schedule, we can provide that to you. Okay. Like that. [46:17] Okay. [46:18] So we would envision— [46:19] The code says a public presentation is usually the first, [46:23] which isn't a public hearing. [46:25] But generally, the, the chair has established public comments are available. [46:31] But We were reluctant to go with a presentation this evening because the [46:37] presentation this evening because the comments [46:37] would be based upon sort of incomplete data. [46:41] And we want to make sure that public is— we're being transparent. [46:46] You're being transparent and that the public knows the project that you're [46:51] proposing. And there wasn't really enough information for that to happen. [46:57] But I don't think you're necessarily— [47:00] No, I'm not. [47:00] and I'm not speaking for you, ready to call for a public hearing. [47:03] Nope. [47:04] You want to— [47:05] Yeah. So the document deadline, according to what Vincent said, 15 days. [47:10] I believe that would be Friday of this week in order to get it submitted for our [47:17] next regularly scheduled meeting. That's aggressive, understand. [47:22] But, you know, if we can have some, some solid responses at that point, [47:28] And can put this on the agenda. [47:30] Potentially we can have the presentation, presentation at that point, [47:36] and then potentially the public hearing thereafter. Okay, great. [47:41] All right, I think that's it. [47:43] That's it. [47:44] Thank you, guys. [47:45] All right, so anything else that you guys want to add based on what you heard here [47:48] so far? [47:49] Last call for the consultants. Any questions? [47:52] There's a whole group behind me that are itching to speak. [47:55] There are a lot of questions in here, but we understand the timing is— [47:59] I have one very basic question. Is the plan for these to be for sale or for rent? [48:06] We're still undecided on that, but— [48:09] Okay, fair enough. [48:11] Probably for rent, but we'll— [48:13] A little louder, please. [48:14] Probably for rent, but we're still not 100% certain. [48:16] Thank you. [48:17] Okay. [48:18] So I do have several questions having gone through the documentation, [48:23] the supporting documentation for water supply and sewer and parking, etc., [48:30] supply and sewer and parking, etc., traffic, [48:30] etc., if you'll bear with me. [48:33] So referring to the supporting documentation about the preliminary water [48:39] documentation about the preliminary water engineering [48:40] report, page 3.0, On that document, on the very bottom of the page. [48:46] Based on the testing of the existing 6-inch water main on South Riverside, [48:52] can supply domestic needs to the projects. [48:55] In other words, we got a 6-inch water main on South Riverside. [49:01] Mm-hmm. [49:02] However, fire flow, fire flow at the 6-inch water main provides less than [49:07] specification required for fire protection. Water flow demand. [49:12] So then I mentioned we got 2— we got a couple options. [49:16] One is to build an on-site water storage and pump system. [49:21] And the other is if we're able to bring down a water connection from Wayne Street [49:27] that would supply— potentially supply this. [49:31] That— [49:32] Vince, you might be able to speak to the status of that, [49:35] but I think that easement is— [49:37] Yes. [49:38] been under discussion for quite a while. [49:41] And I think we may continue to be under discussion for a while. [49:46] We may want to consider the water storage and pump system on site to be a pretty [49:52] good likelihood that how we might have to support this. [49:56] Yes, currently our design does have the pump and tank system. [50:01] Yeah. Anything you want to add to that, Vince? [50:05] No, still in the works, that easement language for Waterman. [50:09] So that's— and any other members, [50:13] you guys have any questions, [50:16] feel free to jump in while I'm doing this. [50:21] I had one— I'm sorry, one quick question for Bill, actually, [50:25] going back to your memo on item 7 under design design regulations. [50:30] Um, why wouldn't that trigger an additional zoning variance as opposed to a [50:36] waiver from the planning board? [50:38] If these are in the— um, [50:41] it depends on if it's in the code for, um, [50:45] or if it's a special permit requirement, right? [50:50] Number 7, this is regarding the, the sizes, right? [50:56] Off-street parking placement design, that one under design regulations. [51:00] Oh, under design. I'm sorry, I thought you said 7, right? Under design. [51:04] So number 8 then, right? [51:06] I'm asking about number 7, Bill. [51:09] On page 3. [51:10] On page 3. [51:11] 3 of 7. Design regulations has a 7 right there. [51:17] All right. Oh, got it. [51:20] Oh my goodness. [51:21] Sorry about that. [51:21] I don't know why that happened. So, okay, so, uh, number 7. [51:25] Um, so the proposed spot does not meet this requirement, [51:28] is seeking a waiver from the planning board per— so I'm assuming that this is, [51:32] board per— so I'm assuming that this is, uh, [51:32] when we talk about waivers from the planning board, [51:35] that is a special permit requirement. [51:37] Um, but again, we can get clarification on that. So it's a good question, Steve. [51:42] I, again, I can look it up in the code and we'd talk with the applicant on on [51:46] seeking a waiver from that parking off-street parking requirement. [51:50] So yeah, if I may, I can chime in also to that. [51:54] You'll notice in the code provisions, and again, [51:58] I put Article 10 in its entirety in the memo that we'll be uploading for special [52:06] permits, you're permitted to waive from that list of criteria. [52:11] But Anything that needs a variance from an actual dimensional requirement in the [52:18] code, in the zoning code itself, would need to go to the Zoning Board of Appeals. [52:25] So you can waive certain items in, in the special permit criteria, [52:31] but you cannot waive requirements that are actually part of the zoning code. [52:38] code itself. So a dimensional requirement, minimum number requirement, [52:44] those need to go to the Zoning Board of Appeals. [52:48] So those are not available to be waived, only available as a variance process. [52:55] So it is under our purview and not the zoning board? [53:01] Is that correct? Okay, a waiver is Specifically yours. [53:06] Okay. Thank you. [53:08] It's more of a, you know, every site's different. [53:11] You know, where is this going to be located? [53:14] The code, the special permit requirements talk about having them in the side and the [53:19] rear. [53:20] But because the site is different, [53:21] then just don't want to send the applicant to the wrong board for an approval. [53:24] Right? [53:25] Thank you. [53:26] That's a waiver. [53:27] One last question. Go ahead, John. Is the building going to be steel or wood? [53:33] It's going to be steel on the first floor [53:37] deck, concrete floor, [53:39] and then wood frame above. [53:41] Okay, so I'm going to move on to the school analysis and [53:48] schools impact report. [53:50] So page 2 has an inconsistency in the table. [53:55] When we talk about the, uh, low point of enrollment at, uh, [54:02] Groton-Harmon schools being 2021— 2020-2021— of 1,394, [54:09] table below it has a different number for that year. [54:15] So there's just an inconsistency. [54:18] I'm not sure which number is correct there. [54:23] Typo. [54:28] Yeah. A lot of work went into this report describing the cost to educate a student [54:34] and how many students are expected and how much revenue would be generated, um, [54:41] how much, how much tax revenue would be generated to the school district and [54:46] generated to the school district and whether [54:47] that would essentially cover the cost of adding new students. [54:52] So That's, you know, really valuable information. [54:55] It's based on what we expect will be the assessed value of the apartment complex, [55:02] and it would be nice to get a more accurate number of these potential [55:07] accurate number of these potential assessed [55:08] values so we can determine how accurate or not these figures might be. [55:13] In other words, whether the additional students will be covered by the additional [55:19] tax revenue, uh, generated to the school district. [55:23] I don't know how we can— if we can get any sort of, uh, [55:27] preliminary estimate on what the assessed value might be. [55:32] Um, if we don't have an assessor— [55:38] yeah, the town handles that. So you're— [55:42] Bill, how have you guys handled that in other applications? [55:45] you've been involved with? [55:46] Yeah, I guess we could work with the town again. [55:49] Again, work— it's often we have them— if the town does the assessment assessments, [55:54] right? It's, uh, trying to get a preliminary number from them. [55:57] So that would be helpful. Yeah, maybe you guys could pursue that. Yeah, thank you. [56:02] Yeah, I mean, based on the preliminary estimate, [56:04] the tax revenue that we generated for the school district would more than cover the [56:09] additional students who will be coming into the District, [56:12] or expected number of students. Yep, which is a good thing. [56:15] Um, good point, Jeff. [56:17] So wherever we can show math in, in these tables is, is really helpful. [56:24] So that's the school report. Uh, let's move on to the traffic study. [56:31] Um, this is going to be a— just so you know, [56:35] it's going to be a point of focus for us. There's It's a busy part of our town. [56:43] What's unaddressed in this traffic study is Blaze, the Blaze, [56:49] the Historic Hudson Valley's event that takes place for about 45 days in the fall. [56:57] And it runs for 10 weeks. [57:00] Yeah, if you've been down there, it is It is a crowded scene. [57:05] We'd need some sort of at least acknowledgement that that's there and is [57:11] acknowledgement that that's there and is an issue, [57:12] and then a sense about how it you can potentially mitigate it. [57:17] You're going to have residents that are trying to get home after a workday and [57:23] trying to get home after a workday and stuck [57:24] in a line with people who are going into historic Hudson Valley. [57:29] Van Cortlandt Manor. [57:31] So it would be good to have some thought put into that and, [57:36] and how that could be mitigated. [57:39] Um, right across— and there was a really thoughtful letter to the Gazette that [57:45] someone wrote about— [57:47] right across from the building that you're proposing is a driveway that goes down to [57:54] ShopRite that is not for pedestrian use. [57:58] Um, when the ShopRite— when the plaza was modified, [58:02] they put the ADA access on the far side of that parking lot. [58:07] In other words, closest to Van Cortlandt Manor. [58:11] So that is the preferred way that people are supposed to enter— [58:16] pedestrians are supposed to enter ShopRite, to walk all the way down. Nobody [58:23] ShopRite, to walk all the way down. Nobody does. [58:23] Instead, everybody walks down this ramp. It's two-way traffic and it's very tight. [58:30] Especially if people are lugging groceries up that hill. [58:35] And your— that pedestrian walkway from the apartment complex leads directly across [58:42] the street to that ramp that is not pedestrian-friendly and not meant for [58:48] pedestrians. So presumably it would add some pedestrian traffic of people that [58:55] some pedestrian traffic of people that want [58:55] to pick up some quick groceries. [58:58] Want to run down, walk down there, grab some things. [59:02] Um, it's something that needs— I'd love to give it some thought and, [59:08] and how that could potentially be addressed. [59:12] Obviously, this is not on your property. This is ShopRite owner's, uh, property. [59:18] But if there's a way to address that as part of this, you know, [59:24] that would be wonderful. We could put some, some thought into that. Okay. [59:30] Yeah, the number of trips that are expected to be generated is a result of [59:36] expected to be generated is a result of the is a [59:37] result of the apartment complex. [59:40] We've got the numbers are generated, I think, based on. [59:44] A table that comes from, I believe, Rutgers University, [59:49] which provides data to all planning entities. [59:53] That is a table that says if it's an apartment complex with 30 to 50 units, [59:59] the number of average trips is X. So that's where these numbers are derived [1:00:05] that's where these numbers are derived from. [1:00:06] It would be. Desirable if we could instead, or in addition, [1:00:11] use numbers that refer to apartment complexes we've just built here in Croton. [1:00:18] It might be a more like-for-like comparison, [1:00:21] which would be Maple Commons and North Riverside. Is it— is it 425 North [1:00:27] Riverside. Is it— is it 425 North Riverside? [1:00:28] Yeah. [1:00:28] 25 North Riverside, which is Still being occupied. [1:00:32] However, for both of those projects, [1:00:35] and even for one Chrome Point Avenue for that point, for that matter, [1:00:41] estimates were provided that said here's what we expect to be our estimated number [1:00:47] of trips. And if we can incorporate those three residential units into the study, [1:00:54] obviously some have more units, some have less, or they all have more. [1:00:59] Well, Maple Commons has less, and we could adjust accordingly. [1:01:04] But it's good to do a like-for-like comparison. [1:01:08] I think, Steve, you're at the Westchester— [1:01:11] the Pace University Land Use Law Center meeting where some of the planners said [1:01:18] meeting where some of the planners said it's [1:01:18] best to use as a point of reference local projects as opposed to some table The [1:01:24] addresses you just threw out, were one of them, uh, the Baked by Susan apartments? [1:01:32] Because there's 8 or 10 units there that could be studied. [1:01:35] People coming in and out of there, [1:01:37] that might be comparable in terms of geography and the demographic. [1:01:41] Possibly, possibly. But something that kind of fleshes out this data is kind of [1:01:48] kind of fleshes out this data is kind of what [1:01:48] we're looking for, that uses some of our local buildings. [1:01:53] Okay, uh, I think that's it for that. [1:01:57] And all right, so community benefits was, uh, kind of a— [1:02:01] the summary of all these other documents, um, [1:02:05] in terms of what the complex would bring to the community, property taxes, etc. [1:02:12] And, um, again, it's based on projected assessed value of the building. [1:02:18] If there's a way to, [1:02:20] to get a number that we feel is a little bit more accurate or dialed in to drive [1:02:27] these numbers, that would be desirable. [1:02:30] And I don't know, Bill, if that's something you can help with. [1:02:36] Definitely, yes. [1:02:38] Because, you know, we've got it generating a fair amount of taxable [1:02:44] revenue for both The town, the village, [1:02:47] and the schools in Westchester County. [1:02:50] Just if I can chime in, please. [1:02:53] It, it isn't a use that you can regulate. [1:02:58] But if these were offered for sale in a condominium format, [1:03:05] the assessment is based upon a different formula or calculation. [1:03:12] So you might want to look at ownership under a condominium formula. [1:03:19] Those assessments are much different than a multifamily rental [1:03:26] property. [1:03:27] Yep, great point. [1:03:29] Also, we can— we, you know, [1:03:30] we have done a pro forma based on the rent roll that would generate the value of the [1:03:35] building also. So maybe we can have a An appraiser look at it just to get a value [1:03:39] appraiser look at it just to get a value of [1:03:40] what they think its projection would be, and then talk to the assessment— [1:03:44] the town assessor. [1:03:45] Yeah, as much coordination and cooperation between [1:03:50] the applicant and the consultants is appreciated. [1:03:55] Absolutely. [1:03:57] Okay, I think that's all I have for the documents. [1:04:02] Anybody else from the planning board have questions that they want to [1:04:09] add to the mix here? [1:04:12] They don't. [1:04:13] Just one comment regarding the traffic— [1:04:17] speak into the microphone. [1:04:20] Yeah, regarding traffic study, [1:04:22] I think should be more comprehensive to traffic flow through the South Riverside [1:04:28] Avenue and Croton Point. [1:04:30] Where, you know, you're gonna have Lot A gonna be developed. [1:04:35] Maybe that traffic study can be expanded, show how much impact it's gonna have. [1:04:41] Okay, the cumulative— [1:04:45] yes, accumulate time into the other projects, right? [1:04:47] Yeah. [1:04:51] Okay, Vincent, do you have anything? [1:04:52] Not at this time. [1:04:56] So I think that's where we are for tonight, uh, for this agenda item, um, [1:05:00] unless there's anything else or questions that you guys have. [1:05:04] Um, I have one question. [1:05:05] In the event we come back with all our, you know, responses to your comments, uh, [1:05:10] will our professionals be heard at the next meeting, or is— [1:05:15] will the presentation be heard at the next meeting? Um, What's your sense, Laura? [1:05:21] I think it's highly likely that if, [1:05:24] if we can get clarifications and answers to comments and questions, [1:05:30] that the board certainly would entertain a project presentation. [1:05:36] Yeah. [1:05:36] Okay. [1:05:37] I think that's something once we get our responses to you, [1:05:40] probably the planning consultant and the village attorney in our office can sort of [1:05:45] have a conversation so we know, I mean, that there's a comfort level for that, [1:05:50] right? [1:05:51] Like you said, the list of questions will shrink, will shrink, [1:05:54] and we'll focus on certain ones, right? [1:05:55] Yeah. [1:05:56] And, you know, again, [1:05:58] the village engineer is really the intake point. [1:06:02] So, you know, keeping the lines of communication open is always— [1:06:07] everyone's gonna, everyone's gonna be on. [1:06:08] Thank you. I'm standing in for the planning board attorney for this evening, [1:06:15] but we confer daily. So, you know, she probably is even watching this evening. [1:06:21] But, you know, we'll do what we can to move this to streamline it. [1:06:27] The opportunity exists in here. [1:06:29] As you know, the opportunity exists in Article 10 for you to streamline the [1:06:35] Article 10 for you to streamline the process [1:06:36] and look at the site development plan simultaneously with the requirements for [1:06:42] Article 11. So we would like to see that happen. And that would be to your benefit. [1:06:49] So that's why this memo covered both the site development plan and also the special [1:06:56] permit. [1:06:57] So, great. [1:06:59] All right, gentlemen, thank you. Thank you. [1:07:02] Thank you. [1:07:02] Appreciate it. [1:07:06] Okay, we're going to move on to our next agenda item. [1:07:10] And Rob, if you'd like to rejoin us. [1:07:12] Good job, [1:07:18] Geoff. [1:07:23] Is that [1:07:28] weird [1:07:31] sitting back [1:07:40] there? [1:07:44] I've had the [1:07:53] experience [1:08:00] myself. [1:08:07] So I think they just went through and— I can hear you guys pretty well. [1:08:14] Good. [1:08:20] Get the mic a little bit closer to Mr. Cortese. He was hard to hear a little bit. [1:08:25] He's a little soft-spoken. [1:08:27] Right. [1:08:27] Yeah. [1:08:28] Which— [1:08:29] something like this from the early '70s. [1:08:31] I wish they gave the same big note here saying, look, it's like— [1:08:36] what the heck's that? [1:08:38] Print out the memo and cross it out. [1:08:42] Mics are still on. I'm just saying. [1:09:11] We're in the middle of a meeting. [1:09:27] All right, so we're going to move on to our next agenda item. [1:09:34] It's a referral from the Village Board of Trustees to review Local [1:09:41] Law Introductory 10 of 2026, the CAF and EAF, [1:09:46] to amend Chapter 230 zoning of the Village Code that seeks to amend [1:09:54] the text of Chapter 230 zoning to provide clarification as to the [1:10:01] harboring or keeping of animals in the village. [1:10:06] You guys, anybody take a look at this one yet? [1:10:11] Yeah, I have. [1:10:12] Okay. [1:10:15] So this does have a short environmental assessment form. [1:10:20] It has a coastal assessment form, which are largely blank, and appropriately so, [1:10:26] because there's just really no impact. So there's really not much to review there. [1:10:32] The law itself, the changes themselves, has to do with fowl— definition of fowl, [1:10:38] I think, is where it started from. [1:10:41] Right. [1:10:42] And along the way, we clarified a few things. [1:10:46] Most prominently, the keeping of roosters and pigeons shall be prohibited. [1:10:52] Where I don't believe that was spelled out in a previous law. [1:10:58] So that might be one of the bigger changes that's involved here. [1:11:04] Okay, seems to me like a prudent [1:11:09] thing. And we're referred to it to [1:11:14] refer it back, or are we taking action [1:11:20] on it? [1:11:21] Yeah, they're asking for comments if you have any. [1:11:24] Okay. Um, I mean, I think that this has been added to the use provisions. [1:11:31] So it's clear what's permitted in what zones. [1:11:35] It's also clear the number of animals, minimum lot size for certain animals. [1:11:41] So they, they did— I can speak from experience. [1:11:45] And I can get a nod from our 2 trustees in the, in the audience. [1:11:50] They, they looked at this many ways on how to handle it. [1:11:55] And they thought it best that we drafted it at their suggestion to include it in [1:12:02] it at their suggestion to include it in the [1:12:02] use provisions. So it's going to be included in this table. [1:12:07] So everyone's clear, it's clarified what's permitted, what's not permitted. [1:12:13] Mm-hmm. [1:12:18] I would point out that in— if you look at the setback that's required for, say, [1:12:24] somebody wants to have a chicken coop, [1:12:28] it says that shall be penned or housed within 50 feet of any lot line. [1:12:34] And on my particular house, I'm in— not sure if I'm in RA-5 or RA-9, [1:12:39] or the smaller one is. [1:12:41] RA-5. [1:12:42] 5, I think. [1:12:42] 5. I can't really have a chicken coop. Because I have a fairly standard lot. [1:12:48] It's narrow. I can only have it exactly in the middle, which really, [1:12:53] even with the 50 feet, probably doesn't work because the chicken coop is wider. [1:12:59] I would just like to, on the record, note that I can have an ADU on my property, [1:13:05] but I can't have a chicken coop. I think there's some inconsistency to that rule. [1:13:12] I'm not opposing the chicken coop, not suggesting we change it. [1:13:16] It's just an inconsistency with our thinking. That's all. [1:13:21] Is there— [1:13:24] well, I think we can include that on as a recommendation back to the Village Board [1:13:29] of Trustees. [1:13:30] I'd like to review that provision. [1:13:33] Thank you. [1:13:34] Public aware of this? [1:13:36] Yes, it's, it's part of our agenda, so it's posted on the village website. [1:13:41] And the, and the Board of Trustees has been discussing it, um, of course, uh, [1:13:47] at multiple, um, work sessions and then also on the agenda for its referral to [1:13:53] also on the agenda for its referral to you. [1:13:54] So yes, the public is— [1:13:55] Feedback, letters coming in saying that the support chicken Like that, [1:14:00] or don't support chickens? [1:14:03] I'm not aware of— I'm not aware of that. [1:14:06] Um, hasn't been scheduled for public hearing yet. [1:14:08] What's that? [1:14:10] Okay. [1:14:11] Yeah, yeah, they're, they, [1:14:13] they're collecting comments in advance of scheduling it for a public hearing. [1:14:19] So at the public hearing, [1:14:20] it's possible that members of the public would weigh in or send letters or Support [1:14:26] or otherwise. [1:14:31] I don't have chickens, just so you know. I don't have chickens. [1:14:35] A friend of mine does, and I follow him around that field. [1:14:39] He doesn't have a rooster. He gets eggs from the chickens anyway. [1:14:44] So it's a matter of I have to feed my family. Shouldn't be a problem. [1:14:49] Right. [1:14:52] Have to wait for answers to come in. Maybe people have different thoughts. [1:14:55] Yeah. [1:14:57] Oh, my, my parents, when they lived in a larger property, [1:15:00] had chickens on the property, and they didn't have a rooster. [1:15:04] They got plenty of eggs, right? [1:15:07] That's great. Nothing like a farm-fresh egg. [1:15:10] Really fun to follow you around. You can pick out each one. [1:15:15] One's the boss, and the other follow him. [1:15:18] It's going to take off that way, but they don't make any noise, right? [1:15:24] All right, so any, any other thoughts? [1:15:27] Okay, so I think what we can, um, include a note about the, the, uh, [1:15:34] setbacks for chicken coops and specifically in versus an ADU and [1:15:40] specifically in versus an ADU and specifically [1:15:41] on, uh, You know, smaller properties within RA-5. [1:15:46] RA-5, I think it'd be hard to achieve that setback. Yeah, if not impossible. [1:15:53] RA-5 is the 25 feet. [1:15:56] It says 25 feet. [1:15:57] And then all other districts is 50 [1:16:01] feet. RA-5 in the middle, right? [1:16:05] Because the 50-foot lot. [1:16:06] Yep. [1:16:07] It's almost precluding it from happening. [1:16:10] Yep, but I can have a second house. [1:16:12] All right, so I think we can include that in, um, [1:16:16] a referral note back and you guys can work on that, [1:16:20] then we'll take it from there. [1:16:23] Um, the only other item we had on our agenda was— well, actually, Steve, [1:16:28] you had something about— [1:16:30] We were gonna ask an engineer report, um, on the issue about Um, at our last— yeah, [1:16:37] at our last meeting we resolved that there were going to be some landscaping [1:16:44] improvements for, uh, 425 South Riverside, uh, [1:16:48] as it related to the signage and landscaping application. [1:16:53] So, uh, just my question is, has, uh, Andrew Cortese, uh, fulfilled his, uh, [1:17:00] requirements? [1:17:01] Oh, I have to check up on that one. [1:17:03] Okay. [1:17:08] 425. He was here before the board last— [1:17:11] Yeah, I remember. But I think we misspoke by saying 425, which is the report, [1:17:16] the project you just looked at. So it's the 3. [1:17:19] Yeah, same address. [1:17:20] Same address. [1:17:21] Oh, it is? [1:17:21] Yeah. [1:17:22] So it was fulfilling a prior requirement for site [1:17:26] plan modification that needed to be buttoned up. [1:17:30] So I was just looking for an update, which Vincent will get back to us on, [1:17:34] it sounds like. [1:17:34] No problem. [1:17:35] Yeah, great. [1:17:36] And the only other thing, just— [1:17:38] I don't know if we've followed up or where we're at with this [1:17:43] garden center down the way. [1:17:45] It's a good question. [1:17:46] Um, as far as I know, they have been reaching out to the DOT and Last I saw, [1:17:51] I think it was in DOT's court to give them an answer. [1:17:54] I don't think that they have, and that was like 2 months ago. [1:17:58] I could follow up on that though. That'd be great. [1:18:01] It's been 2 months or so since I saw the emails being exchanged, [1:18:04] so I'll look into that. [1:18:06] Thank you. [1:18:07] DOT takes some time. [1:18:09] Yeah, well, we know, several years. [1:18:11] We know. [1:18:12] I, I, uh, I, I said this to the Board of Trustees recently. [1:18:16] There's another community that's been trying to obtain surplus property along [1:18:23] trying to obtain surplus property along the [1:18:23] Sawmill River Parkway for 6 years from the DOT. [1:18:27] This goes back about as long, quite frankly. No, I'm not exaggerating. [1:18:30] To be used as a public park. It's taken 6 years. [1:18:34] That's tough. [1:18:36] Vincent, do you know the status on that clothing drop box that's opposite? [1:18:42] They're trying to get rid of it. [1:18:44] They tried to get rid of it, I think Yesterday, [1:18:46] but it was too heavy for the truck that they had. [1:18:49] So today they were using a forklift or something. [1:18:52] So, um— [1:18:52] They being the people that put it there? [1:18:53] The management company. We don't know who put it there, how it got there. [1:18:56] Really? [1:18:57] Yeah. So they're trying to get rid of that. [1:19:00] That's nuts. Okay, thank you. [1:19:01] I think they might have done it by today, but they're working on it for sure. [1:19:04] They don't want it there. [1:19:04] So the people that own the shopping center are trying to get rid of it? [1:19:07] Yeah, they've got to get rid of it. [1:19:08] Great. [1:19:09] They don't want it there either. [1:19:10] That's good. Thank you. [1:19:11] That's good news. [1:19:12] All right, so I think the only other thing we have on our agenda then would [1:19:18] be the minutes from our prior meeting. I think they're in my— oh, here we go. [1:19:25] I did not have any comments [1:19:29] or changes. Great job, Karen. [1:19:34] Yep, looks good. [1:19:38] I have no comment. [1:19:39] Neither do I. [1:19:40] Okay, uh, John, you want to make a motion on the minutes? [1:19:45] Uh, I'd like to make a motion [1:19:50] that the minutes from June [1:19:54] 20th— [1:19:55] July— [1:19:55] July be accepted without any corrections. [1:20:04] Second. [1:20:04] All in favor? [1:20:06] Aye. [1:20:06] All right, thank you guys. So we're adjourned for tonight.