[0:00] February meeting. If you would please [0:01] stand, we'll do the pledge to the [0:03] >> flag [0:06] to the flag of the United States of [0:09] America and to the republic for which it [0:12] stands. One nation under God, [0:15] indivisible, with liberty and justice [0:18] for all. [0:21] >> Thank you. [0:23] Roll call, please. [0:24] >> Mr. Whitehead, [0:25] >> here. [0:28] >> Present. [0:28] >> Mr. Mr. [0:29] present. [0:30] >> Mr. [0:31] >> Here, [0:32] >> Mr. R [0:32] >> here. [0:33] >> Mr. [0:34] >> Here, [0:34] >> Mr. Burg [0:35] >> here. [0:38] >> Approval of the January 14th minutes. [0:41] Any additions or corrections, please? [0:43] >> Uh, yes. I'd like to correct the uh [0:47] approval of minutes. That's should have [0:50] been December the 10th, [0:52] 2025. [1:01] And another correction um that was [1:03] requested by Scrubal was to remove [1:06] February 11th, 2026 from the top with [1:09] January minutes and title the document [1:11] January 14th, 2026 [1:14] just to clarify what the document is. [1:33] Correct. But here, [1:37] so at the January 14th meeting, we had a [1:42] motion to September 10th, 2025. [1:47] Okay. [1:52] It's because of the way that the [1:54] document is. I think that so when we [1:56] switch it to the new way, I think it'll [1:58] be a lot easier to [2:00] >> Well, [2:04] with those two corrections, I'd like to [2:05] make a motion to approve the minutes. [2:09] >> Second. Have a motion to force properly. [2:11] Second. Roll call, please. [2:14] >> Mr. [2:15] >> Yes. [2:15] >> Mr. Hamilton. [2:16] >> Yes. [2:17] >> Mr. [2:17] >> Yes. [2:18] >> Mr. Christie. Yes, Mr. [2:20] >> Yes. [2:22] >> The tableabling of the Hog Creek [2:24] reconstruction. Mr. Surveyor. [2:27] >> Yeah, we tabled the task one order from [2:31] uh Lockam Group on the Pog Creek [2:34] Reconstruction [2:35] last week. I think uh Mr. Christie made [2:39] that motion. So, this is where we're at [2:42] now. I don't know if he's got more [2:44] questions or if they've been answered [2:45] and we can go from there. [2:50] And Lock Mueller is here. If you'd like [2:51] to have them make an update [2:54] address, [2:55] >> please. [2:56] >> I think might be most appropriate to [2:58] just I'm going to make a motion to [3:00] approve the task for. [3:02] >> Do you want to have L Miller make their [3:04] um [3:05] >> I think I'm Don't we want to approve the [3:06] task order first? [3:08] >> Sure. [3:10] >> Okay. I second that motion to approve [3:13] the task [3:14] first. First, before you get ahead of [3:16] yourself, it's on the table, right? [3:19] >> You have to remove it from the table. [3:21] >> I make a motion to remove the item from [3:23] the table. [3:24] >> Second. [3:25] >> Have a motion before properly second. [3:28] Roll call, please. [3:30] >> Yes. [3:31] >> Mr. [3:32] >> Yes. [3:32] >> Mr. [3:33] >> Yes. Mr. Christie. [3:34] >> Yes. [3:36] >> Thank you, Mr. [3:38] >> Now, Mr. Christie, would you like to [3:40] make your motion to approve the task [3:41] order? [3:43] That sounds like you just did. So, I'll [3:44] second it. [3:45] >> Okay. Thank you. [3:46] >> I have a motion before properly. Second. [3:48] Roll call. [3:50] >> Mr. [3:50] >> Yes. [3:51] >> Mr. Hson. [3:52] >> Yes. [3:52] >> Commissioner. [3:53] >> Yes. [3:53] >> Mr. [3:54] >> Yes. [3:58] >> You proceed, please. [3:59] >> Good morning, everyone. I'm Angie Moyer. [4:01] I'm a project manager with Lock Miller [4:03] Group. I also have my senior engineer [4:05] here with me, Erin Winger, and my area [4:07] manager, Anthony Goodnight, back here. I [4:09] think you've all met him. Um, I thought [4:11] I'd just summarize our task order and [4:13] then um, answer any questions you may [4:16] have. Um, so this is an hourly task [4:19] order not to exceed 49,200. [4:22] And the scope of services that will be [4:24] included are a kickoff meeting including [4:27] a site visit, [4:29] reviewing existing data, delineate [4:32] drainage areas, estimate potential flow [4:35] for the area, prepare hydraulic [4:37] modeling, develop two alternatives, [4:40] including exhibits, preliminary [4:42] estimates, hydraulic modeling for [4:45] alternatives. Identify potential utility [4:48] conflicts, prepare drainage [4:50] reconstruction report, identify [4:53] potential environmental impacts, and [4:55] summarize permitting requirements. And [4:57] this will also include a topographical [4:59] survey. [5:04] » Other questions? [5:15] No, I don't think [5:16] >> Hey, Angie, when you when you delineate [5:19] the area of the waterhed or of the small [5:25] ditch as it is now, that can potentially [5:28] be a larger area than like what we have [5:31] right here on this map that you gave us. [5:33] Is that correct? [5:33] >> I'm going to let you technical person on [5:36] this. So, [5:36] >> yeah, that's absolutely going to be a [5:38] bigger area than Well, I know it's going [5:40] to be bigger than the red area. I was [5:41] just wondering [5:41] >> Yeah. Yeah. Yeah. It'll be a lot larger [5:43] than [5:43] >> it could potentially even go like a mile [5:46] or [5:47] >> Yeah, it's going to be a couple square [5:48] miles of area. [5:50] >> That's perfectly That's what I was thinking. I appreciate [5:52] it. Thank you. [5:53] >> That's the survey limits that you're [5:55] >> Yeah. [5:55] This I I know it wasn't this red [5:57] area. I know this is where we're [5:58] starting at, but when we delineate that [6:00] watershed or what goes into that [6:03] >> side ditch, if you will, uh I was just [6:06] making sure that we're going to [6:08] >> expand it out. Thank you. I actually do [6:11] have a couple questions. Um, what's lock [6:14] Mueller's role during construction? [6:19] » Yeah. So, this task order doesn't [6:21] include um any services, but we can [6:24] provide whatever services you want at [6:26] that time. [6:34] How many days, months you think it might [6:36] take? [6:39] Well, depending on weather, you know, so [6:43] we can get a good survey for you and um [6:47] capture, you know, all the different [6:49] features in the area. Our goal is to [6:50] provide you a draft in 45 days from [6:53] notice to [6:58] you have a section [7:00] um [7:02] about services that are not provided. [7:05] There's 15 items on that list. Um, can [7:09] you elaborate on why that list was [7:12] included and are there things within [7:15] that list that we would need to get [7:18] someone else to do? [7:22] Um, so everything that's included in [7:24] that list we could potentially uh [7:26] provide for you if needed, but they're [7:28] not necessarily all needed at this time. [7:31] Um this first task order uh covers up to [7:36] you know providing that reconstruction [7:38] report doing all the hydraologic and [7:39] hydraulic calculations [7:41] um to come up with two alternatives and [7:44] this includes uh a potential evaluation [7:47] of extending that ditch further to the [7:50] south um as Rose requested. So at this [7:53] point we don't know like if you need to [7:56] replace culverts or if it's just going [7:57] to be ditch work. So, we don't want to [8:01] um have a scope of services and and be [8:04] charging you a fee for work that maybe [8:06] you don't need um or that we don't know [8:08] the full scope of yet. So, that we can, [8:11] you know, kind of rightsize that [8:12] proposal at the time. [8:20] » Any other questions? [8:23] >> The only other question I have, and I [8:25] think this is what Mr. Chrissy is trying [8:27] to get to. But if we get to the point [8:30] where we have a construction plan, [8:33] you offer a service to come back in [8:35] after construction to evaluate the [8:37] process, make sure that it was done [8:38] properly. I think what we've [8:40] >> Yeah. So we we can provide like um [8:42] during construction inspection. Okay. Um [8:45] shop drilling review if that's needed. [8:47] Construction administration. Okay. [8:49] >> Um asbuilt survey if you need that. Um [8:53] >> yeah, we can do all of that. [8:55] >> That's what I was wondering. We ran into [8:57] in the past where it's the we've got all [8:59] the way up to the construction point and [9:01] then [9:01] >> they're just hands off. [9:02] >> Hands off and [9:03] >> No, I appreciate people that can do [9:06] that. [9:10] » Any other concerns, questions? [9:17] » Thank you. It's our next move there for [9:20] sure. [9:21] >> We've already approved the task order. [9:24] I don't think there's any other on this [9:27] reconstruction. But we move on the Thank [9:30] you ladies. [9:31] >> Thank you for [9:33] >> this is the time we have set for public [9:35] comment. Anyone wishing to address the [9:38] drainage board, please state your come [9:40] to the microphone, state your name, [9:44] address, and your concerns. [9:52] Good morning board. Steven Brand, Del [9:54] County Commissioner's Office. I'm also [9:55] the president of storm water board and I [9:57] wanted to ask the drainage board if they [9:59] would be interested in having a joint [10:01] meeting between the storm water board [10:03] and the drainage board. I don't know [10:05] what that would look like statutoily. I [10:07] think legal counsel represents both [10:09] drainage and storm water board. So they [10:11] would have to weigh in on this. Also, [10:13] Mr. Borcher is associated with both [10:15] boards and I think it would be uh [10:17] valuable for both boards to uh have a [10:20] joint meeting. [10:23] >> I support that. Sounds like a great [10:25] idea. [10:27] >> Any concerns from our legal counsel? [10:29] >> No, we can do the notice. You would do a [10:31] notice for each board that you would be [10:33] at the same time in the same place. And [10:36] um the boards could [10:39] we can figure out the logistics on where [10:41] who's going to sit where, that kind of [10:42] thing. So, we can do the notices for [10:44] that. That's not a problem. [10:46] >> And I suggest we use the D doodle tool [10:48] to find the best date for many busy [10:52] people. Well, do you want to do it on a [10:55] the storm water meets the first Monday [10:59] every month? [11:01] And the drainage board meets the second [11:04] >> Wednesday of every month. So, do you [11:06] want to do it on one of those dates? [11:08] That may be the easiest. I think we've [11:10] already sent out the notices for the [11:12] storm water for the year [11:13] >> like before. [11:15] >> I would recommend tagging it onto this [11:16] meeting here. [11:18] >> Commissioner Rian and I are already [11:20] here. We would just need to bring in [11:22] Commissioner Henry and Mr. Borches is [11:24] already here. [11:25] >> Yeah, [11:25] >> sounds best for me since we're already [11:27] going to be here. [11:28] >> Yeah, that's easy to do. We could do a [11:30] You've already published all your [11:31] notices for your meetings. So, the storm [11:34] water will just make a change of its [11:36] meeting to the this time. And you want [11:39] to do it in March. You want to do it in [11:40] April or [11:41] >> March. March 11th would be our next [11:43] meeting. [11:43] >> Okay. [11:44] >> Yep. That's fine. [11:45] >> As well do it in March. [11:46] >> Be here before we know it. [11:48] >> And Mr. Whitehead, I will work with you [11:49] and legal to put together an agenda. [11:51] >> All right. Now, this is not a public [11:54] >> period. Public meeting. [11:56] >> It would be open to the public. Okay. [11:57] >> Be a public meeting for both of them. [11:59] We'll just we'll change the storm water [12:01] meeting from the second to the 11th. [12:04] >> Correct. [12:05] >> Okay. [12:06] >> Mr. Brand, if there's anything that you [12:08] want me to prepare for that meeting, [12:09] just send it to an email. [12:10] >> Absolutely. Yep. For sure. [12:12] >> Y Commissioner Brand, do you have [12:14] specific items in mind? I think that [12:16] it'd be good to talk about uh [12:18] jurisdiction and overlapping priorities. [12:20] You know, we talk about similar topics [12:22] on both boards and I just think it would [12:24] be healthy to have an open conversation [12:26] to make sure that we're using the [12:28] taxpayers's dollars as effectively as we [12:30] can. [12:32] >> Could we have the verbiage of which one [12:35] and who has those jurisdictions? [12:37] >> Sure, we'll be happy to provide that. [12:39] There is a lot of overlap. The storm [12:41] water covers a lot of the same stuff you [12:43] guys cover and there's money in the [12:45] storm water because there's separate [12:47] storm water fee on top of a drainage [12:49] assessment fee. So since we have to [12:52] abide by verbiage, it's nice to see it [12:56] in front of us. I don't like it. [13:00] >> I'd be happy to provide what the storm [13:02] water does. [13:03] >> Thank you. [13:04] >> Yeah. Thank you. [13:05] >> Thank you. [13:07] Anyone else wishing to address the [13:10] drainage board, please come forth. [13:14] >> New business, Mr. Surveyor. [13:18] >> Yeah. Uh, [13:20] believe in James. [13:25] » No, that's Do you want to talk to [13:29] Banning Engineering about the A [13:32] McConnell report? Well, no. At some [13:35] point, [13:36] >> it's up. [13:37] >> I don't step on you. I just [13:38] >> No, you're fine. We're going to open [13:39] bids. And like I said, we got a lot of [13:41] bids to open, so it's up to you guys. [13:46] » Well, as I said in the January meeting, [13:48] the drainage board had me put together a [13:50] list of debrushing projects, [13:53] and so I put together there's 14 of them [13:55] on there. Uh, [13:58] two of them are ones that we do annually [14:01] just because of the water in the area [14:04] and the [14:06] high population density in that area. [14:08] And then the other ones are just ones [14:10] that have needed to be done for years. [14:13] So, I asked I sent out uh quotes to uh [14:18] respects to [14:20] uh some contractors and they got me [14:22] quotes. So, I guess we'll open them up. [14:25] Anybody have any questions before we [14:27] start? [14:28] >> And Mr. Borchers is going to open these [14:29] in the order of priority. So the [14:31] priority that um we feel um they need to [14:34] be completed to sustain drainage in [14:35] Delaware County. Um I would suggest that [14:38] we wait until we have opened all of the [14:39] quotes before we make any decisions on [14:41] awarding any of the quotes to make sure [14:43] that we have enough funds to cover the [14:45] codes the quotes of highest priority. [14:48] >> Making sure we have funds is necessary. [14:54] Uh the the first one is on your sheet is [14:56] no name creek. This is the area that a [14:58] McConnell drains in that Banning [15:01] Engineering is working on a [15:02] reconstruction with. So I thought [15:04] there's no sense of reconstruction that [15:06] tile if the open ditch that drains that [15:08] tile is not [15:10] clear of debris and brush. So the first [15:14] quote was from Butler Masonry. [15:21] I think I got a thingy. [15:24] I do a thingy. [15:43] Butler masonry quote was for $78,190.20. [16:04] The next one is from Coupe Salon and [16:06] Landscape. [16:18] And this was for 45,413. [16:31] And the last quote that we receive from [16:34] this is from JJC Excavating. [16:48] And it's for 47,388. [17:10] The next ditch is the Hyatt. This is the [17:13] one that runs by the old school in [17:15] Tiltson. It's a summer job mowing. It's [17:19] not really de brushing. [17:27] Number 13. First one is from Butler [17:29] Masonry. [17:41] It's for $25,410. [17:53] The next quote is from Coup's Lawn and [17:54] Landscape. [18:05] It's for 20,000 even. [18:15] The next bid is from JJC Escavating [18:27] for $13,860. [18:42] The next one is uh job number 14. It's a [18:46] shramm ditch. This is the one that runs [18:48] through country village. It's also [18:49] another annual mowing job. [18:54] The first bid quote is from uh [18:58] Scram or from Butler, excuse me. [19:13] It's for $30,019. [19:27] Second quote is from Coup's Lawn [19:29] Landscape. [19:34] Yeah, that's a good one [19:44] for 17,000. Even [19:51] the third quote for number 14th, the hot [19:55] the shra is from JJC. [20:05] for 32,748. [20:14] And the last one is from Schneider [20:16] Excavating [20:25] and it's for 10,8684. [20:44] This next quote is [20:47] job number one, the Isaac Linux. And [20:49] this first one is from Butler Masonry [21:02] for a total of $68,837. [21:15] Second quote is from Coup's Lawnscape [21:18] or land in law landscape. [21:24] It's for $57,968.90. [21:29] » That was 57,000. [21:31] >> 57,968.90. [21:40] The last quote for this job is from JJC [21:42] Excavating. [21:56] » It's for $54,345. [22:04] Before we go on, Tom, on this Isaac [22:06] Linux, there was a question about some [22:08] signs that were posted um not to remove [22:10] vegetation. Was that clarified with all [22:12] three of these contractors? [22:14] >> Yes, I've talked to all three of them [22:15] about them. They they are actually [22:18] all of them contacted my office or [22:20] someone else about them and I've talked [22:22] to them all about it. So, yeah, they [22:24] understand. [22:24] >> The the background for the board was [22:26] during the original construction or [22:27] reconstruction of this ditch, it was [22:29] relocated to a new um location. And at [22:32] that time the contractor placed signs um [22:34] permanent signs on the ditch bank that [22:36] said do not mow or debrush, do not [22:38] remove any vegetation. Those signs were [22:41] never removed. So there was a question [22:42] with some of the contractors on do I [22:44] have to mow the whole thing or do I stop [22:46] at the signs? So that was clarified. I [22:48] just wanted to make sure that was done [22:49] before. [22:50] >> So they do the whole thing. [22:51] >> They do the whole thing. And for [22:53] everybody's information, this was the ditch that Walmart South Walmart [22:58] paid for, put in, and I don't think [23:00] anything's been done to it really since [23:02] on that one section. [23:05] >> Thank you, Tom. [23:06] >> Yep. Next, we're going to go to number [23:09] two, the Dora Wilhelm [23:13] versus Butler Masonry. [23:30] Uh $19,019019. [23:41] Second quote is from Coup's [23:43] lawn and landscape. [23:56] It's for $19,019019. [24:10] The third quote is from JJC Excavating. [24:23] So for $24,453. [24:33] And the fourth quote is from Schneider [24:35] Escavating. Nope. Yep. Schneider [24:38] Escavating. [24:50] It's for $8,341.19. [25:11] Next is three, the Donovan. [25:21] First one is from Butler Masonry. [25:33] That's for $30,15. [25:42] Second one is from Coops Lawn and [25:44] Landscape. [26:01] It's for $27,49857. [26:11] The third and final quote for the [26:14] Donovan number three is from JJC [26:16] Excavating [26:27] is for $19,66.50. [26:47] Next up is the thimple number four. [27:02] $6,260. [27:04] That was from Butler Masonry. [27:06] 6260. [27:11] Next is Coup's Lawn and Landscape. [27:25] $15,12.60. [27:35] Next is from JJC Escavating, [27:50] $3,756. [27:55] And the fourth and final one for number [27:58] four fimple is from Schneider [28:01] excavating [28:03] general contractor on this one. [28:12] $10,16. [28:30] Got number five, Campbell Creek. [28:33] First one was from Butler Masonry. [28:44] 54,915. [28:55] Next is Coup's Lawn and Landscape. [29:10] $32,522.87. [29:19] Third is from JJC Excavating. [29:41] $ 28,372.75. [29:50] We got one from Full and Camp E [29:51] excavating. [30:09] It's for $36,610. [30:33] Number six is Lwood Reese. First one is [30:36] from Butler Excavating or Butler [30:38] Masonry, [30:47] $34,665. [30:53] Second one is from Coup's Lawn and [30:55] Landscape [31:05] 26,576. [31:13] Third and final one for the number six [31:16] Reese is JJC Esavating. [31:30] $35,820.50. [31:47] Number seven is for the Ham Miller. This [31:50] is the ditch that runs through uh McCall [31:52] Park [31:54] versus Butler Masonry. [32:09] 99,123 [32:16] Second is Coup's Lawn and Landscape [32:29] 29,526. [32:36] » Tom, can we back up a second? [32:37] >> Yeah. Butler was 99,123. [32:44] » Yes. [32:44] >> And coupe is how much? [32:46] >> 29,526. [32:49] >> Thank you. [32:50] And the third and final is JJC [32:52] Excavating [33:06] $59,52 [33:09] 59052 [33:28] McLean ditch number eight [33:40] Butler Masonry. [33:48] 27,888 [33:51] 30 $27,888.30 [34:01] JJC escavating [34:18] $25,353. [34:22] That's all for [34:25] ML. [34:32] Number nine, the ShraMM. [34:44] Tom, just to clarify, there is a [34:45] difference between number 14, the [34:47] ShraMM, and number nine, the ShraMM. [34:49] >> Yeah, correct. The number 14, the ShraMM [34:51] is what goes through Country Village [34:53] that we know every year. And then uh [34:59] number nine that we're going through [35:01] would continue from the end of country [35:03] village around through LL LJ Stone I [35:06] believe it is and up to 28 and it would [35:09] clear that next section of the ditch cuz [35:12] there's so much water that goes in there [35:13] from Country Village and the surrounding [35:15] houses. This would continue it on to 28 [35:19] and then from there it goes up north and [35:21] it's that's been cleaned before but that [35:24] section [35:25] from Country Village basically to 28. [35:27] Hasn't been cleaned in a long time. Got [35:29] it. Thank you. [35:32] This would be uh Butler Masonry. [35:36] $47,11410. [35:46] Coup's lawn and landscape. [36:00] $42,831. [36:12] JJC [36:14] escavating [36:22] $40,00045150 [36:26] 40 [36:28] 45150. [36:35] This next quote is from Brian Jackson. [36:49] for 16,500. [36:56] The last quote is from Schneider [37:08] 11,7714. [37:23] from second to last one. Here we go. [37:25] Morrison Ditch [37:27] number 10. [37:29] First quote is from Butler Masonry. [37:42] $41,15.70. [37:51] Next one is from JJC Excavating [38:03] $31,72.50. [38:06] 50 cents. [38:20] The last bid for this quote is [38:24] Schneider [38:27] $8,23.14. [38:43] The last of the [38:46] is for the Ferguson number 11. [38:51] First one is from Butler Masonry. [39:05] $52,852.50. [39:13] Next one is from JJC Excavating [39:29] for a total of $39,72.50. [39:38] The next one is from Fold and Camp [39:40] Excavating. This ditch is a partial [39:43] debrush of it and then [39:45] the to dip the whole thing. Uh I believe [39:48] they're going to be putting in some tile [39:50] out there. So they requested the ditch [39:52] be dipped. So Fen Camp appears to have [39:57] put it for debrushing and dipping. So [39:59] they we'll have to add these up. [40:04] Someone's got a calculator [40:09] for the debrushing part of it. [40:12] He has $22,987. [40:29] And for the dipping section, he has [40:31] $11,627. [40:35] » 54614 [40:38] quicker next time. [40:46] » And for the last quote, Schneider for [40:48] the Ferguson dippity brush. [41:07] $17,194.68 [41:09] 68 cents. [41:23] » And we are done. [41:27] If we were to pick the the lowest bid of [41:29] all of these, I think it comes out to [41:30] just over $32,000 [41:34] for the total of um all of these jobs. [41:36] Um Mr. surveyor, do you have any um [41:40] technical [41:43] concerns of awarding these jobs to the [41:46] lowest responsive and responsible bidder [41:50] pending legal review? [41:52] >> I do not, like I said, I've I've seen [41:55] work that Coup's Lawn and Landscape has [41:58] done, but they've never actually worked [42:00] for the county. I believe he's one of [42:02] the lower ones. [42:05] Um, but all the other contractors [42:09] that had a low bid, they've worked for [42:11] the county and I support anything they [42:13] do. That makes sense. [42:16] The lowest bidder on six of these jobs [42:18] was JJC Excavating. Jiren Crabtree, who [42:21] owns JJC Excavating, is in the audience [42:24] today. Do any board members have [42:26] questions or concerns with awarding six [42:28] of these jobs to Jiren Crabtree? [42:36] No. [42:38] Okay. [42:40] >> Tom, do we need to award that we need to [42:42] finish this up today? [42:45] >> No, just there's a couple of them with [42:46] deadlines. [42:48] Uh there's believe there's two that you [42:51] can't get to from a road on our rideway. [42:54] So, you have to go through a field. So, [42:56] I believe I have a one of them has like [42:58] an April 15th deadline and the other [43:00] ones have May 1 deadlines. because you [43:02] can't access them without going through [43:05] a crop field. [43:07] So, uh those would probably be on the uh [43:15] more immediate side. And then there's [43:17] other ones like the annual mow jobs that [43:20] we do. We we won't do those till the end [43:22] of June into July. So, I mean, it's all [43:24] about access and what the actual mowing [43:27] or debrushing is, if that makes sense. [43:30] I I think I summarized it on a sheet [43:32] with the the deadlines on there and you [43:36] know I don't know legalize if you guys [43:38] want to talk about it and award them at [43:40] a different date. Do we have to have a [43:42] special meeting? I don't know that. [43:45] Mr. Craftree, do you believe that you [43:46] would be able to complete all of this [43:48] work as established on the ref request [43:51] for quotes? Please go to the mic so we [43:54] can get it on the minutes [43:58] and and for the board's uh [44:02] I went to the the racer ditch last week. [44:06] He's completed it. Looks nice. I talked [44:08] to the farmer. He's happy. Everything's [44:10] cleaned up. The farmer said he would [44:12] plow some of the rideway. [44:15] Just kind of mudded in a little bit, but [44:16] the farmer was so happy with the ditch [44:18] that he said he would plow that and [44:20] everything looked nice. So, that was [44:22] just for the board's information on that [44:24] racer ditch that we had some trouble [44:26] with last year. [44:28] >> Please state your name and address. [44:29] >> Yeah, it's Jiren Crabree. My address is [44:32] 8800 South County Road, 300 West. Um, I [44:36] do not see an issue in finishing these [44:38] ditches for a time frame given. [44:42] >> Thank you. [44:44] >> I guess is there any other questions to [44:46] Mr. Crafter from the board? [44:49] Okay. Thank you. [44:54] Tom, you've done a great job putting all [44:57] this together and this is [45:01] pretty ambitious and um I like the looks [45:05] of it and thank you and [45:09] once again I think you've done a great [45:11] job on this. [45:12] >> Thank you. The value of this quoting [45:14] process should be apparent to all the [45:16] taxpayers in Delaware County in the [45:17] money that was saved from the highest [45:19] quote to the lowest quote on all these [45:21] jobs. With that, I would like to make a [45:24] motion to accept the lowest responsible [45:25] and responsive bidder pending legal [45:27] review for compliance on all of these [45:29] jobs. [45:31] >> I'll second. [45:34] >> Have a motion before properly second. [45:36] Roll call, please. [45:38] >> Yes. [45:39] >> Mr. [45:41] Yes. [45:42] >> No, [45:44] >> Mr. B. [45:44] >> Yes. [45:48] » Pass. Any other new business? Mr. [45:51] Surveyor. [45:54] No new business. So, just so that for [45:55] the board's information, [45:58] Jennifer will compile the a list of all [46:00] these quotes and send out to all [46:03] participating [46:05] uh contractors that put in quotes with a [46:08] summaration and who was awarded the [46:10] quotes just so everybody knows. Then [46:13] they'll have that for next year and so [46:16] on. But besides that, I have no new [46:19] business. Great, [46:22] >> Mr. Miller. That was I'm sorry. Go [46:25] ahead, [46:25] >> Mr. Miller. Well, can I bring up a piece [46:28] of new business just for the Sure. [46:32] >> When we um were appointed the attorney [46:35] for the drainage board, we appreciate [46:37] that opportunity. We noted that when the [46:40] budget was adopted for the drainage [46:42] board in for 2026 that the um salary for [46:47] the attorney was placed in the 100 or [46:50] payroll part. uh for our purposes and we [46:54] really think it should be moved uh to [46:56] the 300 series which is contractual [46:58] services under the budget. And so we [47:00] would make a request to save the county [47:02] some money and not have to pay payroll [47:04] taxes and whatnot is to make a request [47:07] to council for a transfer of the funds [47:10] for the Delaware County Drains Board [47:12] attorney from the 100 series to the 300. [47:15] You can put it in a 320 or whatever the [47:16] number is for contractual service. We [47:18] think that's a better place for for this [47:20] to be in the first place. [47:23] >> Mr. Brooke, do we need a motion to make [47:24] that change? [47:25] >> Yes. [47:26] >> I'd like to make that motion. [47:28] >> Have a motion before us properly. [47:30] Second. Roll call, please. [47:32] >> Mr. [47:32] >> Yes. [47:33] >> Mr. [47:33] >> Yes. [47:34] >> Mr. Mr. Christy. [47:36] >> Yes. [47:36] >> Mr. Buckle. [47:37] >> Yes. [47:38] >> We'll get that taken for care of for [47:40] you. [47:40] >> What will happen is you'll need to make [47:42] a transfer request to the council for [47:45] their next meeting, [47:45] >> right? I don't think it since it's not [47:48] dealing with new money. It doesn't have [47:49] to be advertised. It just is trans. [47:52] >> We we also have some perpetuation money [47:54] we have to move around. So, we'll put [47:55] that right on there with it and go from [47:57] there. [47:57] >> Okay. [47:58] >> Thank you. [48:10] » Uh Joe Miller with Banning Engineering [48:12] uh Planefield, Indiana. appreciate the [48:14] opportunity to uh talk to you guys [48:16] today. Uh talk a little bit with uh Tom [48:18] and Joe. Um we've got kind of an [48:22] existing conditions analysis of the Abe [48:24] McConnell uh completed. Uh we've been on [48:26] site and walk the whole the whole length [48:28] of it and we've got three draft [48:32] alternatives right now. We'd like to [48:33] meet with staff, go over those, see if [48:35] they have any tweaks they'd like to make [48:37] to those and modifications. Also would [48:39] be a good opportunity to get some kind [48:41] of local pricing that you guys have. for [48:44] uh some drain tile costs. They vary [48:47] pretty significantly. Um when you go to [48:49] different counties, so it'd be nice to [48:50] have some idea when we're putting [48:52] together the uh the estimates. Um so [48:54] we've got a ballpark figure for all [48:56] those things. Um if you want me to speak [48:58] a little bit more about what it's a [49:00] challenging site uh and a challenging [49:03] issue and it looks like it's tried to [49:05] been addressed a couple times already [49:06] and um to varying degrees of success. So [49:10] um but that's kind of where we're at [49:12] right now. need to get something with [49:13] Tom uh set something up and [49:16] move forward. Hopefully have something [49:18] maybe by the next board meeting you guys [49:20] can have an a the full report kind of a [49:22] recommendation on moving forward and and [49:24] what that process looks like. [49:28] >> Any questions for Mr. B? [49:30] >> I I do have a comment. There are two [49:32] claims um on the Ed McConnell ditch by [49:35] um Joe Schneider and um those I talked [49:38] to Joe about those. Both of those [49:40] repairs were for existing clay and [49:42] concrete tile that was part of the 1973 [49:46] and then the 2009 reconstruction. Those [49:48] reconstructions were not properly [49:51] designed or in installed and this has [49:53] resulted in water continuing to flow [49:55] through these existing drains and this [49:58] is one of many claims that we've had to [49:59] fix those by hiring an engineering group [50:02] such as lock Mueller or BL or Banning to [50:04] do this design work. My hope is that we [50:06] avoid further complications created by [50:10] um improper design and installation of [50:12] new reconstructions. [50:16] >> Thank you. [50:17] >> Did you say you had an approximate [50:19] number for the job? [50:20] >> Well, I I want to talk with staff, make [50:23] sure we've got it kind of lined out and [50:25] make sure we got everything encompassed. [50:26] It's a it Mr. Chris, it's a you it's a [50:29] challenging area. There's with with [50:32] three different regulated drains. I'm [50:34] not sure exactly how to address all [50:36] those necessarily uh because it's not [50:38] something we run it. Normally when you [50:40] do a reconstruction, you want to take [50:41] out the old pipe and connect in [50:43] >> Yes. [50:44] >> those. I mean, that's a requirement. And [50:46] when that doesn't get done at the time [50:49] of it, that significantly complicates [50:52] matters and you keep fixing stuff long [50:54] term that uh really shouldn't be needing [50:57] to be fixed. So, uh makes it a lot more [51:01] challenging. [51:04] But no, but yeah, we'll meet with Tom [51:06] and and Joe and uh [51:10] probably tweak what we have a little bit [51:12] and uh bring us before the board [51:14] hopefully next month. So, [51:15] >> we'll have a meeting and review [51:16] alternatives. Thank you, Joe. [51:17] >> Yeah. Thank you. Thank you. [51:21] Any other uh old old business? [51:25] >> No, sir. Oh, yes. I I said this earlier, [51:31] but [51:33] Mr. Crabtree put a claim in for the the [51:35] rest of the racer ditch. Like I said, I [51:37] went out there. Everything's fine. It [51:39] looks great. He did a good job out [51:41] there. And uh [51:43] I would uh give a favor recommendation [51:47] to to pay the claim on the racer ditch. [51:53] Any comments [51:57] >> from our last meeting? I crashed on my [52:00] agenda some little note about a vacated [52:04] ditch uh 700 West Dennis Nixon and David [52:08] How. Mr. Borchers looked into this. Um [52:11] it was not indicated on the current map [52:13] as a regulated drain, but we did find [52:15] Mr. Borchers did find history of that [52:17] being a legal and regulated drain with a [52:20] history of repairs. Um Mr. Orchard has [52:22] looked into replacing approximately [52:24] 1,600 [52:25] 1600 feet of that tile that is currently [52:29] broken down and in poor condition. Um it [52:31] would not change the size or depth of [52:33] the regulated drain. So it would be a [52:35] repair instead of reconstruction. Tom, [52:38] do you have any other comments on that? [52:39] No, I was I I went to receive quotes to [52:42] replace that and I couldn't I wanted to [52:45] get a estimate of the pipe along with as [52:49] you guys know I buy the pipe and and let [52:51] the contractors install it because I've [52:53] dug up too much single wall stuff that [52:56] is basically junk. [52:59] So when we were talking about it then we [53:02] had the snow hit and there's no way I [53:03] could get out there to see what what [53:05] type what size of pipe's even there. I [53:07] know what the map says from 1953, but I [53:10] don't know what's actually out there [53:11] now. So, now that the snow is melted, I [53:13] can get out there, find what size that [53:15] pipe is, get a quote for the pipe, and [53:17] then receive quotes from three or four [53:20] contractors to install that pipe, and [53:22] that'll take that from uh basically from [53:26] the or from the bypass back down to [53:28] where we've worked on it before, and we [53:30] know it works. So, I I would suggest by [53:34] the next meeting that I'll have those [53:35] quotes already and we can open those up [53:37] and replace that pipe. [53:40] I I had two other items um before we go [53:43] on. Um one, Purdue University is [53:45] offering three hours of on-site drainage [53:47] training. Um the deadline is March 15th [53:50] for sign up. Um I would encourage anyone [53:52] from the surveyor's office that is [53:53] interested in that training to sign up [53:55] by March 15th. And um the other one is [53:58] um Indiana Department of Transportation [54:01] is modifying three intersections in [54:03] Delaware County. Um one of those is at [54:06] 300 South and State Road 35. And there's [54:09] been a history of the Lwood re Lwood Ree [54:12] regulated drain um having problems [54:15] draining into the outlet of White River [54:16] in that area. And Mr. Borchers is [54:18] keeping an eye on that project um to [54:22] decide if there are any impacted [54:23] drainage concerns. [54:26] Sorry. [54:29] » Any other old business? [54:32] >> I do not have any. If this is the time [54:35] set aside for any comments from the [54:37] board. [54:48] » Thank you. [54:53] » Next, approval of maintenance claims. [54:55] Any questions, concerns? I I have one [54:58] change that I would like to request and [55:00] that is on um the DEG work order um [55:03] 7412. There are actually two different [55:06] invoices under 7412 and they listed No [55:09] Name Creek as the um wershed and I would [55:12] like to have that changed to aid [55:14] McConnell um just to keep track of where [55:16] the work was performed. [55:21] I don't have any other questions or [55:22] concerns. [55:24] If not would entertain a motion. [55:27] >> So moved. [55:29] >> Second. [55:30] >> Have a motion before us. Properly [55:32] second. Roll call, please. [55:34] >> Mr. Whitehead. [55:35] >> Yes. [55:35] >> Mr. Hamilton. [55:36] >> Yes. [55:36] >> Mr. [55:39] >> Yes. [55:39] >> Mr. [55:40] >> Yes. [55:41] >> Seeing no other business, [55:43] a motion to adjurnn, please. So move. [55:47] All [55:47] >> in favor say I. I. [55:50] >> Thank you.