[7:02] I want to welcome each and every one of you to the August 12th during Board [7:05] meeting. If you would please stand and we'll pledge to the flag [7:11] to the flag United States of America to the republic for it stands. One nation [7:18] under God, indivisible, with liberty and justice for all. [7:24] » Thank you. Roll call, please. >> Mr. Whitehead, [7:27] » here. >> Mr. Hamilton, [7:28] » present. >> Commissioner, [7:30] » present. >> Mr. Christie, [7:31] » present. >> Mr. Bustel, [7:32] » here. >> Mr. [7:33] » Here. >> Mr. Brooks. [7:35] » Orchers. >> Oh, here. [7:39] » Approval of the July 8th minutes. Any additions or corrections? [7:45] Motion to approve the minutes. >> Second. [7:47] » Have a motion before us properly. Second. Roll call, please. [7:51] » Mr. Whitehead. >> Yes. [7:52] » Mr. Hamilton. >> Yes. [7:53] » Mr. Rood. >> Yes. [7:54] » Mr. Christie. >> Yes. [7:55] » Mr. B. >> Yes. Table of business. Pavement [7:59] McConnell. Reconstruction. >> Yeah. I think where we left it last [8:04] month was Mr. Hamilton was going to to talk to the prominent land owners and [8:08] see where they're wanting to go with the three options that we came up. the [8:14] engineer came up with. >> I did talk to two of the land owners on [8:17] the original petition. Dr. Hazlet is here. Dr. Hazlet, is there anything that [8:20] you would like to say? >> If you would please. [8:26] » No problem at all. [8:30] » Good morning. Gary Hazellet, 221 West County Road, 400 South. Uh, yes, I'm not [8:36] in favor of this particular drain project. I do have several reasons for [8:41] that. uh one is that we have had this project [8:46] reconstructed in some manner several what 15 years ago or thereabouts. It was [8:50] unsuccessful. We spent a fair amount of money and I'm not convinced that that [8:54] will happen again properly. two is that uh our end and major owners including u [9:04] Cirrus and Lon Wright who I thought might be here this morning uh really [9:10] don't have a problem in terms of any drainage in that area. The tenant for my [9:16] ground also brings up a point that when we disturb the ground like we will would [9:20] need to do for this that puts the ground in a much less productive state for a [9:25] number of years and that's not very valuable in my mind if we do something [9:30] like that and of course thirdly of all as a major land owner I'm going to have [9:34] to take a chunk of money on this and I don't really want to do that either. So [9:38] I it appears to me that most of the drainage issues appear to be south and [9:44] east of Waynewood, which is where some of the major concerns seem to be. There [9:49] are a few people involved with that area back in there. So I think [9:54] this is a a [9:58] project that not as beneficial down the line as it would be for a group of [10:04] people near the eastern end of that drain. Now, granted, after five and a [10:08] half inches of rain at my house this morning, it does look a little [10:11] different, but uh it won't for very long because it'll pass on down the to the [10:16] creek until the creek gets too full. So, I I myself am not in favor of this of [10:22] any of those repairs. Uh it's too expensive for the money and the benefit [10:26] and uh just seems to be weighted toward one [10:31] end. So, I I uh guess that's all I can say. Any questions for me? item. [10:37] » Any questions? >> Thank you. [10:40] » Thank you, [clears throat] doctor. All right. [10:41] » Appreciate you. >> I spoke to Mr. Wright and his comments [10:44] were similar. Um, it I I estimated that it would cost $122 per acre per year for [10:49] 5 years to install alternative 1, which is the upsizing of the 24-in tile from [10:54] Kalen Road to Noame Creek from 24 in to 30 and 36 in. Um I believe that this [11:01] would be beneficial or even required if there is um pattern tiling done on any [11:06] of those fields from Kowan Road to No Name Creek, but um until that is done um [11:12] the the benefit may not um may not be outweighed by the cost. Um, [11:19] so my recommendation for this is to um put the design for the 36 and 30inch [11:26] upsizing um to put that on the shelf and save [11:31] that for a time when that there is additional drainage planned for this [11:34] watershed. The surface water solution that um [11:39] Banning proposed could be implemented at a time that there is development in this [11:43] watershed but is probably not um not worth the cost at this time to the [11:49] agricultural land owners. And then the repair of the previous um regulated [11:55] drains from 1890 and 1973. That solution that Banning proposed um could be [12:01] implemented at any time to reduce some of the reoccurring claims in this [12:06] wershed to repairs to those still functioning but um old regulated drains [12:12] are in poor condition. [12:16] Any other comments from the board? >> I just let to let you guys know I went [12:20] back [clears throat] and read everything from the 1973 or 78 [12:25] I don't remember 76. There's two or three of them where they tried it [12:28] earlier in the 70s and then again in the later 70s which follows similar to the [12:36] uh it actually goes different than the 1890 because it kind of went right [12:39] through the middle but they did not vacate any of that drain when they redid [12:45] it in 2009 and and rerouted it a little different way. So we still do have a [12:50] ride of way along where the 197070s reconstruction went. So, we do have the [12:57] option to go in there and uh repair that if needed or bust up some of the [13:04] the old clay that we keep on repairing that doesn't need to be there. You know, [13:07] it'd be something that we'd have to dig this after the crops are off and kind of [13:11] assess where it's at. So, we do have the ride ofway there to do necessary [13:16] changes. I was just hoping that they didn't vacate it when they redid it in [13:20] 2009 and they did. So, >> would you look more into that proposed [13:26] um 15-inch repair solution that Banning um designed? Yeah. [13:31] » And once once the crops are off of Mr. Wright's field, um could you report back [13:35] to the board on on an implementation plan for that solution? [13:39] » Yeah, we can I can do that. Um, and another issue that we have when they [13:44] when they lay the tile next to the old tile, which is something you guys know I [13:48] don't like. There's a lot of times we'll lay the new tile with a a field plow and [13:53] it'll be a foot, sometimes two foot taller than the old clay tile, and [13:57] sometimes it's hard to get that to line up and drain right on [14:04] on a deal. So once we get out there, punch some holes, kind of figure out how [14:08] we want to lay that out within our ride of way, it'll be a pretty cost effective [14:13] uh addition or to the already 2009 uh reconstruction. So I can get that [14:21] together once crops are off. You live out there, some other people, if you see [14:25] the crops are off, give me a call and we can get a contractor out there to punch [14:29] some holes and kind of lay out what we've got and what's good and what's [14:32] not. The other two issues that we had with [14:35] this previous reconstruction was recording the actual path of the 2009 [14:39] installation. Um could you make sure that that was properly recorded in 2009 [14:46] and if not take the steps to record the location of the current installation? [14:50] » Absolutely. If it's if it's not and this is the same thing I was going to bring [14:54] up with the uh the ditch that we took in on 700 [14:59] East. I was I'm going to contact a land surveyor to go ahead and record the the [15:04] legal description of that so I can get it in into the cards, get it on the [15:08] rules, and make sure all our rideways are good for that. So now that we'll [15:13] have two, it'll be easier for them to do. [15:16] » And the last issue was the um separating the watershed accounts of the A [15:21] McConnell wershed from the rest of the county. Um I believe that banning will [15:26] provide a um a GPS coordinates of the outline of this watershed. Um Mr. [15:32] Surveyor, what what steps would be required to separate this watershed [15:36] account from the rest of the county? [15:41] if if he gives the roles with each uh property on there and their uh property [15:49] ID and what acreages are on there, then we can separate that out. [15:55] Uh as of right now, it would be the same uh ditch assessment unless that changes, [16:03] but we could separate it out. Yes. If he gives if he gives me the all the partial [16:08] numbers and acreage uh we can separate all that out if we [16:14] separate it out before anyways. But if we're not going to do a reconstruction [16:17] then why is that? >> What Banning had suggested was to [16:22] separate this out so in the event of a future implementation of alternative one [16:26] or two the surface water or the 30 and 36 in we would be ready to um to [16:31] separate those from the rest of the county. The other issue is is this [16:35] 15-inch repair work that Banning had proposed. I believe it is alternative [16:38] three. Um that would be advertised over 20 years and um that would be assessed [16:44] to only this watershed. Although the cost is small um I believe that this [16:49] would be an opportunity for us to um to figure out the necessary steps to [16:54] separate watersheds um to separate watersheds account accounts. [17:01] » Do them all. No, we're not going to do them all. Not right yet. [17:05] » Just one at a time. >> One at a time, please. [17:07] » Now, what was the 20 year? >> The the 15-year re the 15-inch tile [17:13] replacement can be advertised over 20 years because it's a repair of an [17:18] existing repair. >> If it was a reconstruction, it would be [17:21] advertised over five years. >> Yeah. Those years is what I I worry [17:26] about. [clears throat] Reconstruction should be over 20 instead [17:30] of five. But anyhow, any other comments? >> So, if it's just a repair, could we we [17:37] couldn't just pay for it out of our maintenance account? [17:40] » We could we could, but I think this is an [17:44] opportunity to separate the wershed to the wersheds. So, that someone across [17:48] the county is not paying for repair in Monroe Township. [17:55] » And Mr. Mayor, >> yes, sir. [17:57] » In past history, there is those split out somewhere along the line, [18:03] isn't it? >> Yeah, I believe a McConnell was actually [18:05] the last time they split out. Last time they reconstructed it. So, we just take [18:10] the parcels, split them up the way that uh engineer says, and if there's a they [18:16] have to pay an extra assessment, then we assess [18:19] » that watershed. >> Yep. [18:21] » Thank you. Any other questions, comments? [18:25] » Are we expecting I mean, are we done with banning? Have they done all their [18:29] work? I I think other than the um the roles with property ID and the acreage [18:34] that the surveyors ask for um I don't believe there is anything else that is [18:38] outstanding from banning. I believe they have completed everything that we've [18:41] asked them to do [18:46] a motion >> since it is tabled business. Um [18:54] I think we should I motion to remove this from the table and close the issue. [19:00] Second. I >> have a motion before us properly. [19:02] Second. Roll call. >> Mr. Redhead. [19:05] » Yes. Mr. Hamilton. >> Yes. Commissioner. [19:07] » Yes. >> Mr. Christie. [19:08] » Yes. Mr. >> Yes. [19:11] » Bruce somebody Moravis jurisdiction open ditch, please. [19:17] » Uh, yeah. He he approached about us taking this [19:22] open ditch in as a regulated drain because the town of Selma doesn't have [19:26] enough money to or funds. I don't know really what he said to maintain this [19:32] ditch. Uh I I last month if you can remember right I didn't know what the [19:37] proper procedure was because we haven't received a [19:41] any any type of uh document that is asking us to take this in as a regulated [19:47] drain. So, I asked uh Stribble to look into that and do would we did we figure [19:53] anything out on that? >> So, we've been working on this and I [19:56] have a couple of things I want to go over with you on um some mapping so that [20:01] I can clarify >> which I which of the two things I need [20:05] to do. Okay. >> Um because when I what I thought I was [20:08] working on, Selma was questioning um some of the area to the north of it. [20:13] Okay. So, I want to go over the exact details of the mapping and then I've [20:16] already started working on letters for the town to reach out to the land [20:20] owners. Um, so the town's working on their side of it as well, so we can kind [20:24] of track this together and then they'll get a formal proposal that we're putting [20:29] together to present to you guys. Um, we just didn't have time to get it all done [20:35] within the last month. So, we are actively working on it and then Bruce [20:39] will come up and present that to you guys as soon as we're we've got our [20:43] heads around everything and got the consents from all the land owners [20:46] because it seemed like that was something that this board would want to [20:50] have in consideration when looking at the requests. So, [20:57] so I believe we just leave that table. [21:03] Moving on. Recctor drain reconstruction. >> If you guys remember last month, I [21:09] presented a report on the recctor drain that we've had a couple people file [21:13] petition to reconstruct. And uh my biggest issue was is 80% of [21:20] it's through wetlands. So, I wanted to get with the DNR to make sure that the [21:24] mitigation costs wouldn't put us over the threshold [21:28] for uh you know, profitable reconstruction for the the farmers and [21:32] the other land owners involved. DNR did get back to me. Uh they do not require [21:38] per permits for working on tiles, and this is a the whole drain is a tile [21:42] drain. There's no open ditch to it. Uh so they wouldn't require any [21:47] mitigation or any any permits for us to go in there and reconstruct it. Uh they [21:54] have a special process for surveyors to get permits to the DNR and that only [21:59] applies to open drains. He tagged uh the the guy the gentleman from DNR [22:06] uh CCD the IDM and asked them if they would have an issue with it. Please get [22:12] back with me. they have not got back with me on it. So, uh, as of now, as far [22:18] as the DNR is concerned, and I assume the IDM, they're not very good at [22:21] getting back sometimes, uh, I don't see that they have a problem [22:25] with us exploring reconstruction on this on the recctor drain tile. [22:35] » Any questions? Do we have a properly signed petition for reconstruction on [22:40] this? >> Yes. [22:42] Um, I I did talk to Mr. Cox about this reconstruction. I believe he was on the [22:47] petition and he may not have understood the uh what the reconstruction entails. [22:53] » Okay. >> Um I I would like to go over this with [22:55] Mr. Cox. He was waiting to hear back from the DNR. Um I I do not know that [22:59] he's continues to support this reconstruction. [23:02] » Okay. Well, uh just let us know and we'll go from there. I [23:06] » I believe this should remain on the table for another month because I I [23:09] believe if Mr. Cox removes himself from the petition. I don't know if we have [23:12] the proper amount of land. I agree. So, >> okay. It'll stay t This is a time we [23:20] have set [clears throat] forth for public comment. Anyone wishing to speak, [23:25] please come forth. State your name, address, and your concerns. [23:32] » Yeah. Skyler Southern, 613 Northwood. Uh you guys been working on a regulated [23:37] drain out there and I've got part of that drain that runs right through my [23:40] property. It is not shedding water enough and I've got three properties [23:44] that are flooded. Um we're trying to renovate them. We renovated them, put [23:48] about 50 grand in each one of them and uh this morning I've got about 6 in of [23:53] water through all three of them. I'm just looking for direction on if I can [23:58] handle this personally or did the county do it, the surveyor. I'm just not quite [24:02] sure. >> Mr. surveyor. [24:05] » Yeah. What we have it's what' you say 616 [24:08] » 613 >> 613 [24:10] » north north. >> We have a tile that runs north of all of [24:14] the properties. The tiles in flowing condition. I walked out there. I believe [24:22] I had a lady call about a month ago. [24:38] And you can see these are all the properties talking about you're [24:41] renovating. It look like it looked like most of them were all [24:45] » and if you look just just north of where the last one [24:49] is, we have a tile that runs through there. It's a small 8 in tile that [24:55] drains that. But the the issue is is it doesn't drain any of this stuff. [25:03] That water run straight down right down the road. [25:09] Thank you. Thank you. Now, there is there is a [25:15] say like a a bridge that crosses Northwood. [25:21] » South of his location right here. >> So, what county road? Where where we at? [25:26] » Oh, my fault. Let me let me zap out. You're just north of 32, [25:30] » east of Selma. >> Yes. [25:31] » East of the 700 East project you're working on. That's part of the same [25:35] brown ditch. This is uh >> 32. [25:38] » This is 32. This is Selma. And then this is Northwood right here. It's a It's a [25:42] little T- road to the north. [25:48] And as you can see right here, we have a tile that runs north of his north [25:52] property. And that's that's flowing. Where I think [25:57] the issue is, and I've talked to the county highway, [26:00] is there's a bridge right here or a large culvert, excuse me, where it's 34 [26:06] of the way full. I think I've asked them to remove [26:12] the the dirt underneath that. I don't know [26:16] if they've done it yet. I don't think they have. Have you know stand? Okay. [26:22] But I guess the the issue that I have is yes, we have a tile that runs north of [26:27] all that, but I don't have, you know, the tiles flowing. I don't really have a [26:32] a way to tie in tie them in. [26:41] Yeah. Just to try to try to relieve some of the water that actually got to the [26:46] tile. with it. The issue is a lot of it's [26:50] a lot of it's coming down the road and and from the back side of the property, [26:55] not really from our area. [26:58] » I think I got about seven, eight acres right there that go behind those. I was [27:02] going to parcel those off and try to sell them to a farmer farmer, but you [27:05] know, at this point, I can dig a retention pond or something to to just [27:10] shed that water away from that low spot. >> Now, if you dug a retention pond, I [27:14] think the board would be okay with you tying the outfall of that retention pond [27:20] into that tile, and that'd give you someplace to go, at least with the the [27:24] outfall. But it's just a low it's a low area, and [27:28] there's really no good good place to take the water. That's that's the issue. [27:31] Yeah, it all pools right on a pump station. Um, [27:36] » perceptic, [27:39] » but they're I mean, all three properties are pretty much worthless. Can't do [27:42] anything with them. Can't occupy them. Can't do anything until until I fix this [27:47] problem. [27:50] » Tom, what kind of shape's that 8 in in? Is it pretty good? [27:53] » I like I said, we sunk another breather in there about three or four years ago. [27:57] It was in the plastic and it was flowing fine. And I went out there a month like [28:02] a month ago, but it was empty. So I, you know, I assume it's flowing. It wasn't [28:07] backed up. Now I haven't really been to where daylights and maybe through this [28:14] woods when it comes where it comes through this woods. Maybe that's [28:17] something we can clear out of there on top of it and make sure that it's [28:20] flowing at at its proper, you know, volume. But like I said, the [28:27] the biggest issue is the I can bring on the it's kind of hard to [28:32] see up here, but the biggest issue is this water pools the pools back here and [28:38] there's really no way to get it to there that I can do. You know, I can make sure [28:43] that that tiles in and you can point it out [28:45] » and it's like an L shape right now. So all that water is sitting right here and [28:50] right through here. But uh I mean I'm I'm going to go strip all this out. Try [28:55] to any sort of water movement, but it all [28:59] right right there. [29:09] » Oh, Mr. Mayor, you will look at that 8 in on down the line. [29:14] » Yeah, like I said, it was last time I was out there, it was flowing. [29:17] I think there needs to be some work on his part on the on the private ground [29:23] for a way to get water to it, whether it's a retention pond to hold that water [29:27] for a while. I mean, obviously the last couple days it's extreme situation, but [29:32] we still don't want water on the houses, >> right? [29:34] » So, I I can meet you out there at some point or [29:38] however you want to do it, but we need to get a way to get hold that water for [29:42] a little bit. Like I said, a retention pond would be a ve a very nice addition [29:46] to that, but I know they're also expensive and uh [29:51] you know, I don't know if that 8 in will handle all that water at once. There's a [29:56] lot of area that drains right right down there where he's talking about. And it's [30:00] it's it's bad on both sides of the road out there. It's just not it's just not [30:04] this uh west side. The east side gets a lot of water, too. Especially down here [30:09] south [snorts] down in this area. [30:14] It's a it's just a low area. >> Where's that 8 inch out outlet at? [30:21] » Uh it ties into here and then it it ties into the brown ditch right here. 700. It [30:27] ties into that tile that here's a here's that ditch that we took in and where we [30:34] had the one reconstruction. All this ties into that. That's why when we had [30:39] the engineers put together the list of [30:44] affected properties, as you can see, all these properties, all these properties [30:49] are involved in that reconstruction. [31:02] All right. if you'll get with this gentleman and [31:07] see if we can come to some conclusion, Mr. Syer. [31:12] » Yes, absolutely. >> Hopefully, we can work something out. [31:17] » Sounds good. I appreciate >> Thank you. [31:19] » Yep. Thanks. >> Anyone else wishing to speak? Come [31:23] forth. [31:27] New business, Mr. Surveyor. >> Yes. Uh, let me put this in real quick. [31:54] So, this is the new bond permit application that we will be seeing now [32:00] on. Yeah, like I said, I've signed off on a couple that didn't have a regulated [32:04] drain near it. Just kind of there's been two other ones that have came through [32:08] since we've done it, and I've signed off on two of them. There wasn't a regulated [32:13] drain near it. It wasn't really a drainage issue, and so I went ahead and [32:17] signed off on that. Now, this one, uh, [32:23] I've got the right here's a copy of what, uh, Mr. Snider [32:33] gave me and I was out there. This is a very wet area. So, he's going to try to [32:37] put that pond right in here. And so, he's seeking a reduction of ride of way [32:41] to 20 ft next to this ditch. It's this isn't the ditch here. It's right in the [32:47] middle if you can see it. So, the pond will go right around in here. [snorts] [32:51] And he 20 feet where we can get down obviously both sides of that ditch. And [32:56] then he would like to tie the outfall into the ditch. So he needs a reduction [33:00] of rideway to 20 feet just in a couple sections right here. And then also an [33:07] approval to tie into the Stewart ditch. If you look [33:13] at his neighbors, [33:17] there's a bunch of them that have ponds right just like that all along here. Uh, [33:22] I don't really see an issue with it. Like I said, this is a very wet area. [33:28] Even Beacon lays the lays it in like it's around that area. [33:33] So, I don't I don't see an issue with it. I think it'll slow some of the water [33:37] movement into the ditch, which is always nice. Uh, the only issue I'd have is [33:42] reducing that down to 20 ft. the ditch bank would be our [33:47] responsibility, but if something happens to the pond bank, if it collapses or if [33:52] it fails at some point and we can't get equipment down there, which granted we [33:58] can get on the other side, but I would like to have some kind of stipulation [34:01] that we can go in there and fix it at the cost of the landowner. We've done [34:06] that before in the past. [34:11] » Any questions? How much how much distance is sufficient of right away to [34:16] maintain that ditch on the same side? >> 20 feet is as low as I'll go. Usually [34:20] it's 35 uh 20 ft in some kind of in a very uh [34:27] urban setting where they've built the house basically on the ditch already and [34:32] they're looking to remodel the house. We've went down to 20 ft. you know, [34:36] that's typically big enough to get a excavator, a pickup truck, or any kind [34:41] of equipment through there. But, as I said in the past, I've seen [34:46] where they've built a pond next to a ditch like that. The ditch moves or the [34:51] pond breaks down and sometimes that 20 ft becomes 10 ft real fast. [35:02] Mr. Bosel, you're out there. any observation? [35:07] » I think it'll be okay. Um, it's back where the old Cunningham Park was, isn't [35:12] it? >> Or Cummins Park. And there was a pond [35:16] back in there at one time. >> That entire [35:18] » Sir, would you please, we need to get it recorded. Thank you. [35:22] » It helps my secretary. >> I'm sorry. That entire valley you see [35:27] there used to be a reservoir dam lake. It was 4 and a half to 5 acres. And the [35:33] Cumins family when the old man was put in a nursing home got worried about [35:38] liability, somebody going in there and drowning. So they had the dam removed. [35:43] So our our choice was to not replace the dam, but rather just dig down from the [35:50] existing level so that we don't change water level on anyone else's property. [35:55] The cabin that you see in the picture is at an elevation of 935 ft above sea [36:02] level and the valley floor where we want to put the pond is right at 900 above [36:09] sea level. So there's a 35 ft drop. It's difficult to appreciate that in this [36:14] picture, but the topographical me there you go. That's quite a steep hillside [36:19] that goes down to that valley. The entire north shoreline of Steuart [36:25] Ditch in the east will always be accessible to work from. And I'm not [36:30] concerned about the county if they come in and dredge it and and tear up the [36:35] dirt in my dam along the pond. I'm not concerned about that. I've got a [36:39] backhoe. I'll fix it. I got 70 acres worth of dirt to fix it. [36:45] » Thank you. >> Thank you, sir. [36:48] » Thank you. Any other questions or concerns here? [36:52] » So, Mr. Surveyor, what what is your recommendation for the ultra right [36:56] ofway? Should it be 20 ft, 25 ft, 35 ft or unchanged? [37:01] » Well, I I think where this where this pond's going to sit and [37:06] looking at other ponds that have been constructed years ago, the same 20 ft. I [37:10] I I think 20 ft would just be fine with me, you know. Uh, I think that'll give [37:16] us proper to get in there, but we also can always get in there on the north [37:20] side, too. So, [37:24] » and what legal agreement will we put in place? Um, if we reduce this right away, [37:29] » we'll have a I think Jennifer's got one to sign. It's a reduction of rideway and [37:33] then he'll take that to the recorder's offices and get it signed. So if you try [37:38] to build something or someone builds something on there that they know that [37:42] the ride ofways reduced down from 75 ft to 20 ft. And then also [37:48] because you're going to outfall into that you're going to outfall into the [37:51] ditch. Correct. So then we just need a to put in the minutes a motion that he [37:57] can tie into the Steuart ditch from the outfall to the newly built pond. [38:02] » I had one more comment. >> Yes. where I concerned [38:06] » that area is half private land and the other half is classified forest [38:12] wildlands property. Nothing can be built there. So, it's going to remain a a [38:19] natural wildlife area for all future generations for as long as I'm alive. [38:26] Whoever buys the property after me has to continue that classified program or [38:32] pay the back taxes to the tune of 14 to $20,000 just to get started. [38:40] » Thank you. >> What's the pleasure? [38:46] » I motion to reduce the right of way to 20 ft in this area [38:51] as requested. >> I'll second it. [38:55] Have a motion before us and properly second. Roll call, please. [38:58] » Mr. >> Yes. [39:00] » Yes. >> Mr. Rick, [39:01] » yes. >> Mr. Christie, [39:02] » yes. Mr. >> Yes. [39:04] » Thank you, Mr. Snder. >> Thank you. [39:08] » Are you also going to do a motion to tie into the ditch? [39:13] » Yeah. I I motion to to approve the requested overflow into the regulated [39:18] drain. [39:21] » Second. >> I have a motion before properly second. [39:24] Roll call. >> Mr. Whitehead? [39:26] » Yes. >> Mr. Hamilton? [39:27] » Yes. >> Mr. Reagan? [39:28] » Yes. >> Mr. Christie? [39:29] » Yes. >> Mr. B? [39:30] » Yes. Old business. Mr. Ser. >> Yeah. Mr. Snder. We'll have a a paper in [39:36] our office probably tomorrow at some point, but we'll have it in there. You [39:40] just You'll need to take it down to the recorder's office and get that recorded. [39:43] » Mr. Swear. >> Mr. Swear. [39:46] » Yeah. >> Your able's assistant has I think. [39:49] » I mean, at some point we'll have it, right? [39:51] » I have it right here. Okay. >> They just have to sign it. Do we need to [39:54] get a copy of it for our office or not? >> Um, [39:57] » yeah. So, probably tomorrow at the earliest, but uh [40:01] it's ready. >> Sure, 100%. [40:05] » Yes, I do. [clears throat] >> Thank you. Thank you. [40:09] » Yes, you can leave. [laughter] >> Old business. [40:13] » Uh yeah, the first thing is is the the our journey's maintenance interest. Uh [40:19] do you want to speak on this? I think we may have folks that will speak on us. [40:24] » Okay. >> In the back. [40:27] » In the back perhaps. >> Name. Tanya. Brad. [40:32] » Sorry. [40:36] » Hi. Tanya Dunmore, Chief Deputy Auditor. >> I'm Brad P, County Treasurer. [40:43] Um, I talked to John on the phone and I just kind of went over with him on some [40:48] details of what we did with DCCC and he understood all of it, but he said, you [40:54] know, he's just one of the board members, so he just wanted it to be [40:57] presented to the rest of the board members so that everybody understood. I [41:01] don't know if he spoke to any of you about what we talked about on the phone. [41:07] Um, but basically you guys just need to come up with the amount that you are [41:13] willing to invest. Um, and then Brad, he takes care of the actual investment. He [41:21] his office takes care of all the banking where we're the funds. So we would um we [41:29] can show the amount that you choose to invest from your um such fund whatever [41:36] fund number it is and we can show that on a separate line so that you can see [41:41] oh yeah that's our invested amount. This is what we're still working with kind of [41:45] thing as far as like cash flow. Um and then we would also create a revenue fund [41:52] number in order for the interest to go into. However, his office, they do the [42:00] interest. They would take care of receiving that interest. They would take [42:03] care of quite in that interest on a monthly basis. Um and they track [42:09] everything. They can supply you with statement of course in order to show um [42:16] your earnings and such, but they would take care of everything on a monthly [42:20] basis. As far as um lucrative, I guess you'd say, as far as getting your hands [42:25] on the money um at all times, you can within a day because it's like a EFT [42:34] transfer. But what I also explained that wouldn't be something that the treasur's [42:39] office would want to have to do constantly for you. So, you would want [42:44] to pick an investment amount that you can kind of invest and not really have [42:50] to use um on a constant basis, I guess, just for convenience-wise for his office [42:56] cuz that would be a lot on them to constantly have to move that back and [43:00] forth between where he takes it from in order to where he puts it to. So the [43:05] place that he was going to invest into is called Trust Indiana and that is a [43:11] pool um within Indiana. It was created at the state level um by the treasur [43:19] few years back quite a few years back. I forget what year it was and it's a pool [43:24] investment of all the counties in Indiana. Whoever wants to invest into [43:29] that they can and therefore it pays at a higher interest. Um and he has that [43:35] interest rate as far as what it's paying right now. [clears throat] [43:38] » So right now currently um we just got our statement. They're paying 3.6193%. [43:45] Compare that to what some of our other accounts we have here locally. Um [43:51] they're in the 1.75 to 2 and a half range. So it's quite a bit over. So more [43:56] than a percent over what is the going rate I guess. [44:00] because there's power with, you know, with there's the the investment power [44:04] with a lot of money uh throughout the state so they can get better rates. [44:11] » Thank you. Any questions? >> Mr. Surveyor, in this account, we have [44:16] [snorts] two deposits a year for the collected ditch assessments. [44:19] » Yeah, we have two draws a year on it. Correct. [44:21] » And then we have 12 um withdrawals for the claims that we approve every month. [44:25] Is that correct? >> Correct. Are there any other withdrawals [44:28] that we would expect from this account? >> I don't I don't believe so. It's just [44:34] the our maintenance. Yeah. So, it would just be 12 or 12 We take Yep. 12 a year. [44:41] » Is that acceptable to the treasur's office if we have two deposits and 12 [44:46] withdrawals a year in this account? >> Um, [44:51] yeah. Because I mean with the deposits I mean we could you know basically to get [44:56] initially set up we'd won a number um I think when we met with the board of [45:03] finance and they approved um this um I think there was about a million dollars [45:10] total. Now, if you don't want to invest all that, I mean, with I don't invest [45:15] all the county count's money in trust Indiana because they want to have the [45:19] commissioner's council, they want to have access to it like very quickly. Um, [45:24] which we can get it if it's on a a weekday, we can get it the next day. I [45:30] mean, that's the thing. That's the nice thing with Trust Indiana. It it is very [45:34] liquid, so we can get our hands on it. Um but yeah, it shouldn't be any problem [45:39] of getting that the two deposits and then um just a monthly withdrawal [45:46] on that. >> Did the did the board of finance give [45:51] you an estimate of what they would suggest? [45:54] » They did not. I don't think they they you know it would be up to whatever they [45:58] whatever this board is comfortable with asking. [46:03] Um, just to kind of give you an idea, if you look at say 500,000 at the current [46:09] rate, it's about $18,000 a year. Um, if you invested a million dollars is you're [46:16] doubling that 36 about 36,000 per year. [46:21] » So, countywide, how do you break it up as far as what you invest and what you [46:27] keep? So locally we have to keep at least 50% [46:31] um in our in in local banks and so that's kind of where we're at. We have [46:37] some in Trust Indiana. We have some in United Fidelity which is out of [46:42] Evansville. They're paying four over 4%. So they're at like 4.34. So [46:49] we've got a large sum in there. So we just kind of look at honestly what what [46:55] we're getting the best rates on. with with keeping in within that 50% [47:02] uh local 50% outside of outside of local you know what we look at [47:10] in trust Indiana it's about right now I've got about 10% of [47:15] the county's money in trust Indiana and it's probably look at with the rates [47:21] look at maybe moving that to maybe 15% so I I mean it's all liquid. I mean [47:28] that's that's the nice thing with trust Indiana is we get the next day. [47:35] » Right now in the in the maintenance fund we have almost $1.2 million. But my [47:42] suggestion would be to at least leave out let's say like $200,000 [47:47] and that way we always have enough in there to pay the next month's claims. [47:51] things happen, computers go down, and I'd hate to hold up payment to [47:54] contractors and distributors if we don't get the money transferred over in time [47:59] or something happens. I mean, that's what my suggestion would be, at least to [48:02] leave a month's worth of uh money in there to to pay out our uh account [48:09] payables. >> And Danielle, we wouldn't have to have a [48:13] board meeting to change it or how we [48:20] what do you mean? Well, if he's just suggesting in case we would need more [48:27] to use. >> The commissioners had to approve this [48:31] entire process. >> Yeah, the commissioners have already [48:35] approved the interest account. Do you are you asking like if you wanted to [48:40] change the amount you invested as this board? [48:43] » Right. [48:47] » Yes. I Yeah. So my recommendation is make sure you leave out enough that you [48:52] don't have right. >> If I may add to that as well um since I [48:58] am in the auditor's office and we do deal with the claims and such and I know [49:03] um what the his um deputy has to do in order to process those. I would have to [49:10] agree with him that that is a wise idea because you have to put in for your PO [49:16] process that has to be approved before that person can even do a claim. Well, [49:21] they can't get their PO approved unless there's money there um for the auditors [49:27] to say yes, that fund has availability. So, if we're waiting on uh the treasurer [49:33] in order to get the money, in order to get a quota to stand in, I mean, it kind [49:37] of jams you up in the pay process. I mean, you know, I I don't know how much [49:43] he he can suggest the amount. I'm just saying the process of it. There is a [49:48] kind of like a timely process of it to get it all [clears throat] finalized. So [49:53] then the next time we got a draw, we would have to have maybe a little [49:57] discussion as to how much of that draw went into which to which account, [50:03] whether we wanted to invest it or not invest it. [50:07] » Yeah. Would it automatically come into the 2700 account? And then once that's [50:10] in there, I would let the board know because it's not always it's always not [50:15] always the same date every year. Um, and then once once it's the fall taxes is [50:19] the next one coming up. And when that gets in there, I say, "Hey, listen. We [50:23] got and it's usually, you know, a fifth of what the spring [50:27] taxes are for our board. It's not 50/50 like a lot of other ones." I would let [50:32] you guys know, hey, this is what we got in there. It's $10,000. Do you want to [50:36] leave that in the maintenance of fund to pay out or do you want to invest it and [50:40] we can go from there? Uh, how would probably be the easiest way. [50:46] » [snorts] >> The auditor's office by law have to have [50:49] the settlement distri distributed to all the units by the 31st of June andor [50:57] December. >> Right. [51:01] » His most chunk of his money comes in the spring. [51:04] » Yeah. Because like I said, it's a $10 for most people's $10 and they just pay [51:08] that in the spring instead of splitting it up five and five. [51:11] So Tom, if we put 700,000 in the Trust Indiana account and then the rest [51:18] outside of it, >> I mean, that's what I would do. You [51:20] know, I always feel better with money in the bank that we can pay something comes [51:24] up, you know. >> Does that seem reasonable to you folks? [51:29] » Um, I I would think so. I don't do your do your budget but [laughter] [51:34] » well I mean it push >> but you got over a million dollars. So [51:37] yeah I think that leaves what you say that leaves you $500,000 basically if [51:41] you got 1.2. So I mean I I I don't know your um expenses I guess. Um, but [51:48] » typically once or twice a year we'll have like this month we'll have one over [51:52] 100,000 but for the most part they're usually 40 to 60,000 every month [51:57] [snorts] >> with with our this month's claims being [52:00] $100,000. Um, I'm inclined to to make a motion would be to put a million in [52:06] Trust Indiana. That would leave us with $200,000 in our account. That would pay [52:11] for this month's claims and give us cushion for the next month. and then [52:15] every subsequent month as we approve claims pull those out of the trust [52:20] Indiana account. Does that seem feasible? [52:25] » Now on that I mean with I mean we're you know we we have a lot of different [52:31] accounts that we really would rather not every month be pulling money out of [52:36] there and having to maintain it. um you know quarterly maybe doing something [52:40] like that because that otherwise it puts a lot of burden on my back office the [52:45] bookkeepers uh in my office too you know because there's now another uh [52:50] department that also we're we're having trust Indiana funds on and so with you [52:57] know doing the regular job this is kind of in it in addition to and so um I [53:04] would recommend maybe having enough for three months [53:08] um and doing maybe a quarterly withdrawal on the, you know, on that if [53:13] we if you needed to. Obviously, if you're looking at a million dollar, [53:18] you're looking at probably about $3,000, you know, $3,500 a year a month in [53:24] interest, that would be going back into that account. So, that kind of offsets [53:28] the 40. But um yeah, I would say probably doing having enough in there [53:33] for to cover at least three months and maybe even a fourth month just in case. [53:39] Um so it's roughly what about a4 million. So um you know, wherever that [53:46] leaves you with what your balance is, you know, 1.2 and if you had four months [53:50] of it, um you know, you're looking probably 200,000. So yeah, I I would [53:56] think with a million you should be okay. Maybe 900,000, [54:01] but that's totally up to the board. >> I think typically that one [54:04] » we'll invest whatever you guys tell us to. [54:06] » That 1.2 is a little higher than normal investment. [laughter] I mean it seemed [54:10] to me mean like a lot of months it's 800 to a million. [54:13] » Correct. We last last year we saved saved about 300 400,000 back into the [54:20] debt maintenance account. So we're a little bit higher than normal. But also [54:24] right now we've basically used the majority of our spring money already. So [54:30] I you know I'm not sure what we're going to get in the fall, but we're not going [54:32] to have you know I we're going to be lower than [54:36] what we started the year with obviously because we did a lot of we've done a lot [54:40] of work and a lot of good things. But Mr. P suggested, I I'd rather have [54:48] I'd rather have more money in our maintenance account to pay out than [54:53] having to worry about it every month between [54:57] » uh Jennifer, Tanya, and everybody, you know, and then when when she puts in the [55:03] the claims, there's not enough money there. And then we have to wait a couple [55:06] days. And it's we don't get our invoices usually until late Thursday, early [55:11] Friday. We have to have all those entered then approved [55:17] uh by Wednesday morning. That only leaves us a couple days to do all that [55:21] paperwork. And it's uh I would like to have enough money in there that we don't [55:25] have to worry about pulling it pulling money out of Trust Indiana to cover this [55:31] month's uh payables uh in two days, three days basically [55:37] Friday to Wednesday. So, you know, you guys do what you want, but I'd rather [55:43] have extra money in there just to cover it in [55:47] case we have a big month, something happens or, [55:51] you know, Trust Indiana goes down or anything like that. There's nothing [55:55] worse than being a contractor or someone expecting you only get paid once a month [56:00] and then you're going to have to wait an extra month because of a clerical error [56:04] on our fault or someone else's fault. What if we did 800,000 now and then [56:10] watch and see where we're at? Then if we see we're carrying okay, we can always [56:14] add to it, can't we? >> That that would give us $400,000, [56:18] » correct? >> Of cash. [56:20] » We could even do if we did 900, that gives us 300,000. I [56:23] » I think 300,000 would be sufficient. I mean, this month is $100,000 worth of [56:27] claims, which is the highest that we've ever had, [56:29] » right? >> But Joe, we've been doing 800 to 1.2 two [56:35] million just sitting there and >> most people didn't say word. [56:39] » You were right. You were right. But yeah, [56:42] so Wayne did >> 300,000 should get us through shipment. [56:46] That gives a pretty good buffer. >> That would be three months worth at the [56:49] at the at the minimum. >> Yeah. [56:51] » Okay. I I make a motion to move $900,000 trust. [56:57] » I'll second that. I have a motion before properly. Second. [57:03] Roll call. >> Mr. W. [57:06] » Yes. >> Yes. [57:07] » Commissioner. >> Yes. [57:09] » Mr. Christy. >> No. [57:10] » Mr. >> Yes. [57:13] » All right. Thank you. >> Approval of maintenance claims. Any [57:18] questions, concerns here on maintenance? [57:32] A motion to approve the maintenance claims. [57:38] » I'll second it. Have a motion before. Proper second. Roll call. [57:43] » Yes. >> Yes. [57:44] » Mr. >> Yes. [57:47] » Mr. B. >> Yes. [57:50] Board comments. [57:54] So, do we need to make a motion if we want to split that [58:00] out for the m a McConnell or what do we need to do there? If we [58:06] want to do that, >> I I think the surveyor was investigating [58:09] what um what steps are required to split that out and I will talk to Banning [58:14] about the few things that he asked for and we will we will leave this on the [58:19] agenda for the next month. Okay. And as far as splitting them out now, it, [58:25] you know, they won't know the difference until [58:28] you send them out letters and say, "Hey, we're going to raise the maintenance fee [58:32] for the a McConnell." So, right now, it's going to be the same as the rest of [58:36] the county. We'll just know that instead of break broken down into the four ones, [58:42] there's going to be a fifth one that we'll have broke down. So, as far as [58:45] actual land owners out there right now, they won't see a difference in it. it [58:49] would maybe show up on the bill as a McConnell instead of Northwest, you [58:55] know, whatever they're in. But that uh until you guys make action [59:01] raise the maintenance fee for that particular one, it'll be normal for all [59:05] the land owners. So, >> and once we get that information [59:08] together, we'll do that to update. [59:14] » Any other comments from the board? Yeah, I got a couple three things. Um [59:22] Tom, we had a contractor that uh was low bidder on a couple of projects and did [59:29] that fellow kind of indicated that he was not going to do them. He told me [59:36] that all his employees are hurt and all his equipment's broken and the earliest [59:42] he could get to any of it was the end of this month. So, I sent an email out to [59:48] the board members because one of the one of the projects he had, [59:53] the one through country village, needs to be done. It needs to get done this [59:56] time of year. Uh I like to do that between June and July 15th. So, that's [1:00:01] that job is for the most part done right now. Everybody's happy out there. Uh [1:00:07] there's another one that I took away from him because I, you know, there's no [1:00:11] sense of waiting on him now. I'm going to add a section to it and we'll just re [1:00:16] quote that out for next year. It's on the list. It's one over by Ball State. [1:00:20] There's another section I want to add on it. So, yeah, he just basically said [1:00:24] that his equipment was broke and so was his employees and he didn't know when he [1:00:29] could get to it. >> So, so the country village job was [1:00:33] reassigned to >> correct. And it's done. [1:00:37] » And the other job will be within the next round of loops for debrushing. [1:00:41] » Right. There was a third one on there too that I missed when I was [1:00:45] » and that will be within the next round of votes for [1:00:48] » There's Yeah, there's a second one that is on the other side of Country Village [1:00:53] that I awarded to Mr. What's I'm sorry, what was his name? Jackson. [1:00:58] » Brian Jackson. >> And he's going to start on that when the [1:01:01] corn is off. He was a second bidder on that. So, as soon as corn comes off on [1:01:06] over there by uh LJ Stone, he'll start on that ditch. the third one that's over [1:01:10] by Ball State. We're going to rec quote that out on our [1:01:15] next package of quotes. Uh the reason I did that, it's one that's be better to [1:01:20] do uh in the winter. It's easier to see and it there's a lot [1:01:25] of traffic down those roads. Uh a lot of people that like trees and it's easier [1:01:30] to do that sometimes in the winter when it's not so obtrusive. [1:01:36] So then to kind of continue on that, um, and I think we've touched on it in the [1:01:42] past a little bit, these contractors that take these jobs on and then they [1:01:48] either don't do them or they don't do them correctly, [1:01:53] do we have recourse? [1:01:58] » I mean, potentially. I guess each situation is going to depend on what the [1:02:02] circumstances are. I mean, do we need for them going into this to sign or some [1:02:09] way to make sure that they understand that if they take these jobs on, they [1:02:14] have to do them and they have to do them correctly? [1:02:20] » John, are you suggesting that we add something like a 10% penalty for a [1:02:24] contractor who's not performing on a uh on an awarded job? [1:02:29] » I I don't know. I just think we need to I mean we've had a couple of these where [1:02:35] you know they they got off the hook scotfree. [1:02:38] Uh I think you as a board have to decide how serious you want to be about [1:02:47] pursuing those options, right? I mean it's is it is the juice worth the [1:02:51] squeeze? So what are your damages? Is it worth pursuing? That's and that's why I [1:02:57] say it's going to be each situation you're going to have to look at [1:03:00] individually on what did the lack of performance or the quality of the work [1:03:08] what damages did it cause the drainage board is that worth something pursuing [1:03:12] from the scope of work that they were engaged to do. So, [1:03:16] I guess that's about as lawyers and answers you're going to get is [1:03:20] potentially. But >> I I would just think if they stopped [1:03:23] getting the telephone calls, Tom, that that would be enough warning that their [1:03:28] work wasn't >> It doesn't It doesn't always help. The [1:03:33] one on the racer ditch I called what three or four times a week would not [1:03:38] answer, you know. >> You're not using him anymore, though. [1:03:42] » Well, he No, no, I'm not. So initially when after we award these [1:03:49] jobs to the con to the low bidder is it basically just a handshake deal? [1:03:55] » He signs the specs and on the specs and I can change the language and we can [1:03:59] clean up the language but the specs that I have them sign in return with their [1:04:03] quote says you know the drainage board is [1:04:07] uh you're not doing a good job. I can't remember how I ever worded now that [1:04:10] you're there allowed to pull this job from you at any time. Uh if you know I [1:04:16] can't remember how I put it off the top of my head and I can [1:04:19] » we can look at >> Yeah, we can get maybe clean that up a [1:04:22] little bit. >> Could we put in there like at our [1:04:24] discretion we possibly could pursue legal? [1:04:28] » I mean it should it should say that anyway. But yeah, we we'll clean up the [1:04:32] language. He can get those to me. We can take a look. [1:04:34] » Okay. I mean that's just my thoughts. I don't know what anyone else [1:04:37] » I mean I would suggest not >> but finding them because our our office [1:04:44] doesn't take any money in and that would be kind of a I mean you can you could [1:04:49] find them by what you pay out. you can take a percentage off what you pay them [1:04:53] out. But as far as like ahead for every day that you don't finish this job, you [1:04:58] pay us $250, which I've seen in other contracts. I think that'd be hard for [1:05:03] our office to do because we have no we're not set up to take any type of [1:05:07] payment right now or h or have never been set up to take any payment. I don't [1:05:11] know why that is. We just are. [1:05:17] One more thing, at the last storm water meeting, there was some discussion about [1:05:24] a rate cost of service study or something. Uh, but in watching the [1:05:31] meetings, there was discussion about drainage board could be affected in some [1:05:35] way. Recall that. [1:05:40] Could anyone elaborate on that? >> You want elaboration? Steven Brandell or [1:05:45] county commissioner's office. You want uh elaboration on which part? That [1:05:49] there's a cost of service study being performed or how it could potentially [1:05:53] impact the drainage board? >> Yes, [1:05:55] » both. So, there is a cost of service study going to be performed so that we [1:05:59] understand the affordability index which is uh basically a requirement [1:06:04] [clears throat] and then it could impact the drainage board as Mr. Borcher [1:06:07] brought up during the storm water board meeting because sometimes they're [1:06:10] overlapping um responsibilities. I guess maybe is maybe that's not the right word [1:06:15] to say. Mr. Borcher, would you say that's the right word? [1:06:18] » That's correct. >> So the cost of service study could [1:06:21] impact uh where there's a uh responsibility by the drainage board uh [1:06:26] and there's overlapping responsibilities between storm water and drainage. It's [1:06:31] it's very rare when it is because if it's a regulated drain, it's our [1:06:35] responsibility. But there's situations where it's either [1:06:39] vague or not drawn. You know, 1890 didn't say what was what. So, there will [1:06:45] be some overlapping responsibility and I don't know if the cost of study will [1:06:49] point that out, but it may be. So, when we get the study back, I can report back [1:06:53] to the drainage board on anything that I feel is uh pertinent to the drainage [1:06:57] board. >> Yeah. I think to Mr. Borcher's point, I [1:07:00] don't believe the cost of service study will uh provide clarity on [1:07:04] responsibility between the drainage board and the storm water board. What [1:07:07] the cost of service study does is it goes out and it looks at your current [1:07:10] rate uh versus your um historical expense expenditures plus any projects [1:07:16] that you have planned. So that's where the drainage board would also come into [1:07:20] play. So we'll have to put out from the storm water board's perspective, these [1:07:24] are the projects we have planned. Drainage board, these are the projects [1:07:26] we have planned. And then it looks at the affordability index. What what can [1:07:30] the taxpayers afford? And then we'll have a recommendation back from uh the [1:07:34] municipal advisor. Let's make that up. Say it's Baker Tilly. Uh they'll come [1:07:38] back and say based on your projects, based on your historical expenditures [1:07:42] and based on the affordability uh in your community, this is our recommended [1:07:47] rate uh that that they would recommend a rate and then the storm water board [1:07:51] would have to adopt new rates. >> Is there a fee for the study? [1:07:54] » Of course there is. That is our expectation that we will help pay that [1:07:58] fee. >> That hasn't been discussed, but I [1:08:00] appreciate you bringing that up. I'll put it in my notes. [laughter] [1:08:04] » No problem. >> Thanks, Mr. Christie. [1:08:09] » I think that's all. >> Any other comments? [1:08:14] » May I know there was a public comment section [1:08:17] already and I wasn't able to be here, but [1:08:19] » it's been marked off. >> Yeah, [1:08:20] » go right ahead. Commissioner. So, just for everybody's awareness, the county [1:08:24] has been put in a yellow status due to the flash flooding that we've had this [1:08:28] morning. We've had to close a couple of roads, specifically Albany Pike from [1:08:32] Rainer to 700 East. Uh, Black Mill Road from 67 to Old Granville and 300 South [1:08:38] Priest Ford around the river over by Yorktown. I think those are pretty [1:08:41] typical. Also, uh I think that we should take a look uh at the drain on the east [1:08:48] side of Cowan Road in front of Progress Rail. Uh prog the front yard in Progress [1:08:53] Rail is completely flooded this morning. I understand it's a flash flood event, [1:08:56] but that legal drain drains north to Buck Creek. And when you get to 23rd [1:09:01] Street there where Midwest Metal is, there's an inlet down in the ditch and [1:09:05] it's dry. There's no water running into that, but Progress Rail is completely [1:09:09] flooded. Having said that, Progress Rail just did some work out there. Uh they [1:09:14] put uh catch basins in their parking lot and they cut up our trail and they came [1:09:19] and they drained into that open ditch and they dipped the ditch out. Whether [1:09:24] they had permission to do any of that or not, I don't know. I'm just letting you [1:09:27] guys know they did do some work and we have the new housing project that's just [1:09:31] to the south of it where they just paved their parking lot. So you have all that [1:09:36] sheet drain. So they have all that roof, they have all that parking surface. So [1:09:39] all that impervious surface is now also hitting that drain. Uh I believe Mr. [1:09:43] Bortra, isn't is that a legal drain? >> So here's the issue with that drain. And [1:09:47] uh when they were [1:09:51] building what whatever they're building out there now, I can't I think it's [1:09:54] maybe apartments, I don't remember. >> So that legal drain kind of went into [1:10:00] that area. And so I had a contractor because I couldn't find it by probing. [1:10:04] So I had a contractor go out there and he was out there for a day digging every [1:10:09] where we thought that that old tile was at. So what I think [1:10:15] happened is when they went from one road cuz it ran right up the road to four [1:10:19] lane and then my sanitary came in and ran a sanitary up there. I think at some [1:10:24] point they vacated that drain because I could not find it anywhere and like I [1:10:29] said he was out there for a day digging and probing and it it was not there [1:10:33] anymore. So I I don't know if that's something we need to get my sanitary [1:10:37] district because there's a sewer project that runs right there where that old [1:10:42] tile was, but I think at some point when they went from one lane to four lane, [1:10:47] that tile disappeared. >> Yeah, I I recall when that happened. And [1:10:51] if if I recall properly, I think Gradea A Excavating was the contractor at that [1:10:55] time that put that. And it's really deep. [1:10:57] » Yeah. >> I mean, it's it's super deep. So, I [1:11:01] don't remember if it was abandoned in service or not, but you bring up a very [1:11:04] good point. So, I think that still needs anyway, Progress Trails flooded uh up to [1:11:10] uh where they have that burn where they park their locomotives out front. I've [1:11:13] never seen it flood like that. Now, it's a flash. Maybe it's down by now, but [1:11:16] that was, you know, 6:00 this morning. Um earlier there was a question came up [1:11:21] about who would make the decision on how you changed what you had invested uh in [1:11:27] an account. uh the commissioners and the board of finance authorized this board [1:11:31] to make those decisions. So if you guys want to change those allocations, my [1:11:35] point is you don't have to come back to the commissioners or you don't have to [1:11:38] come back to the finance the board of finance. I believe that's your purview. [1:11:43] » Thank you. Thank you. >> Comments from the attorney. [1:11:51] » Thank you. Uh Mr. Borcher, you want to make any [1:11:55] comment on debrushing. Oh, [1:12:00] » I just these are the next round of debrushing I gave you guys. It's just [1:12:04] kind of a simple uh you know, just kind of shows you where we're at. There's [1:12:09] some areas I'm going to add uh on onto this, but I I haven't been able to walk [1:12:15] them all. We've had rain. We've had some other things getting on. [1:12:19] » This is your fall work. >> Yeah. What I'd like to do is quote this [1:12:22] out in October on our October meeting. Um, [1:12:27] if there's something that the board would like to add or take away, [1:12:31] hit me up in an email, call me, and I can work on that. I'm I'm not [1:12:36] 100% on all these, but I I think this is the next round. We've got two or three [1:12:40] of them on here that we did last year, and we only have a couple more sections [1:12:44] to do, and they'll be completely cleared and free of debris, and we can uh [1:12:49] maintain them with a spray program. That's where I'm at on that. Also, I [1:12:55] forgot our next meeting. We're gonna either [1:12:59] have to postpone or move the date to I had to wrote down. I lost it. [1:13:04] » September. >> It's a Tuesday in the afternoon. [1:13:09] » Afternoon. [1:13:12] » That's the only date we're open because of budget hearings. This this room will [1:13:17] be filled with >> county council. [1:13:20] » Yes. >> And Monday's a holiday. [1:13:23] So Tuesday they they have the commissioner's meeting and those [1:13:26] meetings on Tuesday morning. So we could either have it Tuesday afternoon or we [1:13:31] could postpone it and just go to October. Those are basically our two [1:13:34] options with the streaming that we have to stream on [1:13:38] online. This the Indiana code. I leave that up to the board. I don't know if [1:13:43] that's something we have to decide right now later. [1:13:46] » So September 9th is the Wednesday, >> right? It would be that it would be that [1:13:51] Tuesday before that. >> It'll be the only time this room will be [1:13:55] open because counsel will start that next Wednesday. [1:14:03] » We don't know when they're going to resched. [1:14:08] » Oh, >> so we would we have a lot of claims [1:14:10] coming in in September that would need to be [1:14:15] would it push till October? Well, what I think what I've done in the past is [1:14:19] since the claims out, uh, you know, I don't know if this was the only COVID [1:14:23] rules, but when we couldn't meet for a reason, I they made an ordinance and I [1:14:28] can send the claims off to you guys. You guys can look them over and we can still [1:14:31] approve claims with the the majority of the board over an email or a phone call, [1:14:38] I believe, is what the ordinance said. And I don't know if that's still in [1:14:41] effect, but that's how we did it during CO. I don't know if we've missed a [1:14:44] meeting since that. Do you have a copy of that ordinance I could look at? [1:14:47] » I do not off the top of my head. >> I could go back and look, but I I [1:14:52] believe that we could they let us approve the claims with three of the [1:14:56] board members. So, I would get the claims to three of the board members or [1:15:01] more, you know, all of them. >> If you have an ordinance in effect for [1:15:04] that and it doesn't specify it was just during a co time, then that's totally [1:15:08] acceptable. If you know your claims are consistently [1:15:13] the same type of thing and you want to give him even if you make a motion now [1:15:17] to say he has authority to pay those claims next month and then you um come [1:15:21] back in in October and ratify that decision. Um he could send out [1:15:26] everything that was being paid and everyone can send kind of a verbal email [1:15:30] saying you know thank you looks good and you can ratify those decisions in [1:15:34] October if you wanted to also. Is everyone available? September 8th at [1:15:39] 9:00 a.m. [1:15:42] » after. >> It's got to be that. It's not the 9th. [1:15:47] It's the what you what date? >> It's the 8th. [1:15:49] » 8th. That's the Tuesday after Labor Day. >> Yes. [1:15:53] » Okay. >> Is everyone available? September 8th at [1:15:57] 2 p.m. [1:16:05] » Okay, that's fine. Do we need a motion to reschedu? [1:16:09] I make a motion to reschedule the September drainage board meeting to [1:16:12] September 8th at 2 p.m. in this room. >> Jennifer, will you make sure to let [1:16:16] » Yes. >> Second [1:16:19] » motion to force properly second. Roll call. [1:16:22] » Mr. Whitehead. >> Yes. [1:16:23] » Mr. Hamilton. >> Yes. [1:16:24] » Mr. Yes. >> Mr. Yes. [1:16:26] » Mr. B. >> Yes. [1:16:29] » Um, Mr. Do we have to publish that that we moved it? [1:16:32] » Yes. Yeah. >> into the paper or just around the [1:16:34] building to >> So you both and you don't have to [1:16:38] publish it. You just have to send it the notice. You know what I mean? You just [1:16:43] have to email the notice. It doesn't have to be republished. [1:16:46] » Email to who? >> The paper the email for the the one you [1:16:50] send the actual notice is to that email. You just email them, right? [1:16:54] » Yes. >> Yeah. So you just have to there's a [1:16:56] difference in publishing and sending the notice. Okay. [1:16:59] » It sounds the same to me. They put it in the paper. [1:17:01] you publish your yearly list for the beginning of the year. So then you only [1:17:05] have to send notice of a change of meeting. [1:17:08] » Okay. >> I wonder if he [1:17:13] » Okay. [clears throat] [1:17:17] » Any other further business? If not, motion to adjurnn, please. So moved. [1:17:24] » All in favor say I. >> I [1:17:27] thank you all.