1 00:01:51,060 --> 00:02:19,120 Number 23rd meeting of the Durham Plain Board. She'll come to order. We'll start with a roll call. Peter. Peter Howard. Peyton McBannis. Michael Barrett, town planner. Rob Sullivan cannot make it. And I believe Emma Hollander also cannot make it. And Heather Grant as well. And Gary. Oh, and Gary. Gary Whittington. Paul Rasmussen. Sally Tobias. Mike Lerman. 2 00:02:22,100 --> 00:02:30,080 All right, so Mike Lairman will be seated as the council rep and Julian Smith will 3 00:02:30,080 --> 00:02:36,240 take Rob Sullivan's seat and Peter, if we don't have Richard, you're a Richard 4 00:02:36,240 --> 00:02:45,040 Chair. Yeah, actually Peter, you're Gary. Okay. And 5 00:02:47,760 --> 00:02:51,820 I need to update. Hold on, I'll update my notes here. There 6 00:02:58,960 --> 00:02:59,760 we are. Okay. 7 00:02:59,760 --> 00:03:04,160 All right, approval of the agenda, it looks good to me. 8 00:03:04,240 --> 00:03:05,100 Anybody else? 9 00:03:05,700 --> 00:03:07,320 I move, we've announced it. 10 00:03:07,800 --> 00:03:08,140 Second. 11 00:03:08,720 --> 00:03:09,240 All in favor. 12 00:03:09,900 --> 00:03:10,060 Aye. 13 00:03:12,780 --> 00:03:16,080 Oh, are there any planning board members on Zoom? 14 00:03:19,370 --> 00:03:20,110 Just in case. 15 00:03:21,190 --> 00:03:22,490 Town Planners report. 16 00:03:23,750 --> 00:03:32,250 We're meeting next week, September 30th, as one of the months when there are five Wednesdays. 17 00:03:32,250 --> 00:03:39,050 And the items on the agenda, Paul, consented to my putting together sort of my last 18 00:03:39,050 --> 00:03:42,050 to raw miscellaneous zoning changes. 19 00:03:42,610 --> 00:03:47,610 So I'll have a document for you to look at with just mostly smaller things. 20 00:03:48,530 --> 00:03:51,230 But suggested changes all through the zoning ordinance. 21 00:03:51,890 --> 00:03:56,150 And then the second item on the agenda will be the continued discussion of downtown adjacent 22 00:03:56,150 --> 00:03:56,750 zoning. 23 00:03:58,830 --> 00:04:10,750 Our October meetings are the 14th and the 28th, and then we're having one meeting in November and one on December because of the holidays, the board usually has just one meeting in those months. 24 00:04:11,490 --> 00:04:25,830 And I think we did tell you about the, our prospective Newtown planner, Maddie Deiano, who the council was going to hear her 25 00:04:26,610 --> 00:04:36,790 vote on her appointment at the meeting last week and fortune there wasn't a quorum at the council meeting, so that's back on the agenda for the 28th. 26 00:04:36,790 --> 00:04:52,290 I'm confident that the council will approve it, but it's not official until that happens, but she's tentatively starting work pending the council's action on Monday, October 5th, so that's in less than two weeks. 27 00:04:52,290 --> 00:04:58,930 And we will have about two months overlap for me to train her and orient her. 28 00:04:59,130 --> 00:05:04,790 And then I'm certainly going to be available after I retire on November 30th to help 29 00:05:04,790 --> 00:05:06,470 in any way her or anybody. 30 00:05:06,870 --> 00:05:09,990 As I'm a Durham resident, I'm only 20 minutes walk away. 31 00:05:10,750 --> 00:05:19,210 And Maddie will be able to join us for the October and the November meetings as well. 32 00:05:19,930 --> 00:05:20,590 That's it. 33 00:05:22,670 --> 00:05:26,390 Any questions, comments for Mr. Brant? 34 00:05:29,060 --> 00:05:32,400 Reports from Board members who serve on other committees. 35 00:05:34,730 --> 00:05:37,060 I do have something that's energy to be related. 36 00:05:37,540 --> 00:05:44,820 The state has just opened up another grant program for type 2 EV chargers. 37 00:05:48,370 --> 00:05:53,560 Charging infrastructure at travel and tourism oriented locations across New Hampshire. 38 00:05:53,560 --> 00:05:59,860 So if anybody has any thoughts about a place in town that might qualify, let the Energy Committee know. 39 00:06:00,500 --> 00:06:02,760 Yes, Jackson Rank, while they're redoing everything. 40 00:06:03,500 --> 00:06:04,140 Jackson Rank. 41 00:06:04,460 --> 00:06:04,740 All right. 42 00:06:05,840 --> 00:06:06,320 Tourism. 43 00:06:06,600 --> 00:06:06,860 Let me. 44 00:06:07,940 --> 00:06:08,500 Visitors. 45 00:06:09,160 --> 00:06:09,460 Transit. 46 00:06:10,040 --> 00:06:11,260 Lots of people going by. 47 00:06:11,280 --> 00:06:11,960 It's right by reform. 48 00:06:13,700 --> 00:06:14,200 Jackson 49 00:06:18,680 --> 00:06:19,500 Rank for. 50 00:06:21,020 --> 00:06:22,560 Town hall would be good too. 51 00:06:23,340 --> 00:06:23,920 Peyton could charge. 52 00:06:25,880 --> 00:06:27,640 I think wagon hill. 53 00:06:34,640 --> 00:06:42,380 All right, thank you, and any other committee reports? 54 00:06:44,760 --> 00:06:50,300 That council did not have a forearms that did not conduct any official business at the last meeting. 55 00:06:50,720 --> 00:06:52,200 But we did have a nice chat. 56 00:06:52,200 --> 00:07:01,520 Yeah, I gave a planning board report since they didn't have to vote on it, they accepted it. 57 00:07:04,300 --> 00:07:08,700 So on the town council, what's the status of the five-story downtown? 58 00:07:09,500 --> 00:07:10,380 That was continued. 59 00:07:10,960 --> 00:07:17,000 Well, we didn't have the quorum with the last meeting, so that was continued to the 28th. 60 00:07:17,000 --> 00:07:19,300 So, yeah, it's been 20 minutes and it's coming one day. 61 00:07:19,500 --> 00:07:21,580 Thank you. 62 00:07:21,580 --> 00:07:22,100 Thank you. 63 00:07:25,460 --> 00:07:25,840 All right. 64 00:07:25,940 --> 00:07:27,580 Review of old minutes of August 12th. 65 00:07:35,300 --> 00:07:35,720 I don't know. 66 00:07:35,820 --> 00:07:36,180 How do you think? 67 00:07:39,540 --> 00:07:41,620 I gave Michael some small corrections. 68 00:07:41,620 --> 00:07:43,000 I assume they're in this. 69 00:07:44,340 --> 00:07:46,720 They do not, but they will be all the ones 70 00:07:46,720 --> 00:07:47,580 that are straightforward. 71 00:07:48,060 --> 00:07:52,320 Then I'll move will you adopt these as presented? 72 00:07:53,400 --> 00:07:53,720 Second. 73 00:07:53,920 --> 00:07:55,080 Anyone else has something? 74 00:07:57,610 --> 00:07:58,830 All in favor of acceptance. 75 00:07:59,290 --> 00:07:59,470 I. 76 00:07:59,470 --> 00:08:00,430 All right. 77 00:08:00,750 --> 00:08:00,950 Post. 78 00:08:01,990 --> 00:08:02,610 All right. 79 00:08:03,650 --> 00:08:04,610 Public comment. 80 00:08:04,750 --> 00:08:06,330 Oh, I skipped over public comments. 81 00:08:06,550 --> 00:08:08,090 Anyone here with public comments? 82 00:08:11,380 --> 00:08:13,700 We'll move on to our next item, Mr. Berry. 83 00:08:14,740 --> 00:08:15,820 No, you're not Mr. Berry. 84 00:08:16,320 --> 00:08:18,300 Oh, you're actually in the stock. 85 00:08:18,300 --> 00:08:21,160 I thought you were, you know, you're just like our fire department folks. 86 00:08:21,460 --> 00:08:21,800 Okay. 87 00:08:23,020 --> 00:08:24,920 So I thought you were here for the CIP. 88 00:08:25,520 --> 00:08:25,760 Okay. 89 00:08:29,140 --> 00:08:31,980 Public hearing for 73, Biscatico Road Subdivision. 90 00:08:31,980 --> 00:08:37,480 Formal application for a three lot subdivision of 20 acres at Lot 73 to Scaticle Road, 91 00:08:37,900 --> 00:08:40,300 construction of new private road to access lots. 92 00:08:40,780 --> 00:08:45,780 William Goldstein, property owner, Chris Berry of Berry Surveying and Engineering Surveyor. 93 00:08:45,920 --> 00:08:53,260 Matt, P209, Lot 42 in a residence coastal district, and you are a different Mr. Berry. 94 00:08:54,180 --> 00:08:56,700 That is correct, Joe Berry of Berry Surveying. 95 00:08:57,060 --> 00:08:59,800 Chris couldn't make it to the mic, so he asked me to step in from. 96 00:09:01,980 --> 00:09:12,680 I know you guys have seen this project a handful of times, so I guess if you want to let me know if I start with the waivers, or how was it left off last time? 97 00:09:13,040 --> 00:09:19,820 Actually, the waivers is what I have my question mark next to, I wanted to make sure that the list of waivers was complete. 98 00:09:22,330 --> 00:09:32,010 Right, it's only the above ground for the above ground utilities in the first section of the site. 99 00:09:32,010 --> 00:09:32,010 Right. 100 00:09:34,050 --> 00:09:37,510 So for item 19, we have numerous requirements and road regulations. 101 00:09:37,810 --> 00:09:40,410 Oh, I'm sorry. Plus all the waivers for the road, right? 102 00:09:40,750 --> 00:09:44,030 Right. As well as the requirement to bury existing overhead electric lines. 103 00:09:46,230 --> 00:09:51,650 And so is that, is item 19 correct as written? 104 00:09:52,110 --> 00:09:52,470 Yes. 105 00:09:52,910 --> 00:09:53,130 Okay. 106 00:09:54,750 --> 00:09:55,990 Then, yes, please. 107 00:09:56,350 --> 00:09:57,510 Let's go over the waivers first. 108 00:09:57,510 --> 00:10:01,670 Okay, one by one or do you know what ten of them are all for the road? 109 00:10:01,670 --> 00:10:04,530 Do you want to wrap them all into one or yeah? 110 00:10:04,790 --> 00:10:11,770 All right, so waiver number one is to the road regulations section four, item 4.02 111 00:10:12,450 --> 00:10:15,230 to have minimum 20 foot wide pavement. 112 00:10:16,770 --> 00:10:22,150 The second one is road regulations section four, item 4.03, shoulder width. 113 00:10:22,150 --> 00:10:28,510 The third one is item 4.07, shoulder base core steps. 114 00:10:30,780 --> 00:10:35,760 The fourth is item 4.08, base and top course paving requirements. 115 00:10:36,960 --> 00:10:41,440 Number five is 4.09, gravel shoulder required. 116 00:10:42,000 --> 00:10:43,080 Let me pause here. 117 00:10:43,240 --> 00:10:47,280 So, basically the road is going to stay as it is at this point. 118 00:10:47,500 --> 00:10:49,160 Right, so they're just in driveway. 119 00:10:49,990 --> 00:10:54,600 They don't want to have to meet the road standards impact wetland buffers, potentially wetlands. 120 00:10:54,600 --> 00:10:57,900 And the fire department, they looked over this, they don't have any issues. 121 00:10:57,960 --> 00:11:00,040 No, none of the departments had concerns. 122 00:11:00,200 --> 00:11:01,500 No issues from any other departments. 123 00:11:02,420 --> 00:11:09,280 All right, does anybody on the planning board have questions about these road waivers? 124 00:11:09,620 --> 00:11:09,740 Nope. 125 00:11:10,440 --> 00:11:10,580 No. 126 00:11:11,020 --> 00:11:11,240 All right. 127 00:11:11,820 --> 00:11:13,220 We're good with the road waivers. 128 00:11:15,440 --> 00:11:21,720 Now, the overhead electric lines, and again, we basically just want to keep the site the way 129 00:11:21,720 --> 00:11:22,120 it is. 130 00:11:22,360 --> 00:11:22,640 Correct. 131 00:11:22,640 --> 00:11:27,820 Yeah, there's an existing utility pole just passed. I believe it's pronounced neomire driveway 132 00:11:28,700 --> 00:11:33,800 And it goes overhead from the Scratica road to that utility pole and then underground to the rest of the site 133 00:11:34,360 --> 00:11:36,820 And they wanted to leave it as is 134 00:11:37,740 --> 00:11:40,700 And not run underground from the road 135 00:11:44,120 --> 00:11:50,780 Yes, Mike one question going back to the road. Okay. Sorry, but I remembered what at the site walk 136 00:11:50,780 --> 00:11:56,600 There was some discussion about making a wide spot in the road for cars and vehicles to pass. 137 00:11:57,600 --> 00:12:04,180 That was, and that just got let go or it was being sent to the fire department for review. 138 00:12:04,620 --> 00:12:04,800 Okay. 139 00:12:05,360 --> 00:12:06,180 And that was good. 140 00:12:06,180 --> 00:12:06,820 And they seem to be okay. 141 00:12:06,960 --> 00:12:07,140 Okay. 142 00:12:07,400 --> 00:12:07,540 All right. 143 00:12:08,740 --> 00:12:09,380 Thank you. 144 00:12:10,140 --> 00:12:10,660 Okay. 145 00:12:10,660 --> 00:12:25,260 So, yeah, with the overhead electric, they want to leave this site as is, and not disturb the overhead power going to the site or the abutting lot, and that's the reason why, and that's the final waiver. 146 00:12:27,400 --> 00:12:38,610 And so the main reason for that is that that polls actually servicing and adjacent property that's not part of the subdivision. 147 00:12:40,370 --> 00:12:42,750 and changing it to underground from the road 148 00:12:42,750 --> 00:12:47,130 would require giving them a headache for that. 149 00:12:49,970 --> 00:12:50,850 What do people think? 150 00:12:53,980 --> 00:12:56,680 I mean, all the net new will be underground, right? 151 00:12:56,880 --> 00:12:59,300 It's just gonna, you're gonna use that existing above ground 152 00:12:59,300 --> 00:13:00,600 and then you're gonna come down 153 00:13:00,600 --> 00:13:02,740 and then the rest is gonna be run underground. 154 00:13:03,060 --> 00:13:03,240 Correct. 155 00:13:03,680 --> 00:13:06,360 And so from that poll, everything that's existing is underground 156 00:13:06,360 --> 00:13:08,020 and if they were to build a new structure, 157 00:13:08,020 --> 00:13:10,640 sure they would go underground as well. 158 00:13:16,920 --> 00:13:21,780 So we need to approve these waivers, correct? 159 00:13:23,060 --> 00:13:28,780 Yeah, you can approve them separately or as part of the whole thing that's wrapped into 160 00:13:28,780 --> 00:13:28,960 it. 161 00:13:29,060 --> 00:13:30,520 It's wrapped into it very good. 162 00:13:30,720 --> 00:13:32,100 I wanted to clarify that. 163 00:13:34,760 --> 00:13:39,280 Let's see, then we 164 00:13:45,580 --> 00:13:47,040 need to hold a public hearing, don't we? 165 00:13:51,720 --> 00:13:52,560 We haven't. 166 00:13:53,380 --> 00:13:53,480 Right? 167 00:13:53,640 --> 00:13:55,100 This is not a continued public hearing. 168 00:13:55,220 --> 00:13:56,400 We start the public hearing tonight. 169 00:13:56,720 --> 00:13:56,900 Right. 170 00:13:57,120 --> 00:13:57,180 Yeah. 171 00:13:57,660 --> 00:13:57,900 All right. 172 00:13:59,160 --> 00:14:01,460 Do you want to motion to open the public hearing? 173 00:14:02,860 --> 00:14:03,560 I'm sure. 174 00:14:03,900 --> 00:14:04,580 So moved. 175 00:14:05,720 --> 00:14:06,200 Second. 176 00:14:06,460 --> 00:14:06,720 Second. 177 00:14:06,880 --> 00:14:07,240 All in favor? 178 00:14:07,760 --> 00:14:08,240 All right. 179 00:14:08,420 --> 00:14:08,640 All right. 180 00:14:09,120 --> 00:14:09,340 All right. 181 00:14:09,340 --> 00:14:11,920 Wait, is there anyone here for the public who'd like to speak? 182 00:14:18,470 --> 00:14:25,970 My name is Jack Rosenberger, and I have quite a lot of 50 directly adjacent to the proposed new lot containing the existing garage. 183 00:14:26,670 --> 00:14:29,630 I want to start with a little context about why this issue matters to my family. 184 00:14:29,810 --> 00:14:35,930 Before moving to Durham, we lived in Massachusetts and had a difficult experience with a tear down and rebuild immediately next door to us. 185 00:14:36,370 --> 00:14:39,910 The existing house was replaced with a new house built essentially to the setback limit. 186 00:14:39,910 --> 00:14:45,770 A significant tree between the houses was removed and windows and the new house ended up directly aligned with windows and ours. 187 00:14:46,170 --> 00:14:48,790 There's always a very substantial and permanent loss of privacy. 188 00:14:49,250 --> 00:14:52,090 That experience directly influenced our move to their own. 189 00:14:52,470 --> 00:14:57,450 One of the things we value about this community is its wooded character, mature trees, houses with separation from one another, 190 00:14:57,750 --> 00:14:59,910 and development that generally feels integrated to the landscape. 191 00:15:02,160 --> 00:15:29,340 I understand that this subdivision would create a separate, buildable residential lot directly beside our property. I'm not objecting to the fact that a house may essentially be built there. What concerns me is approving that buildable lot now without knowing where the future houses anticipated to go and without addressing what happens to the substantial existing vegetation between that lot an hours. Once those trees are removed and a house is built, there's no practical way to restore the privacy that exists today. 192 00:15:30,040 --> 00:15:31,460 I spoke with Michael about this. 193 00:15:31,680 --> 00:15:35,020 My understanding is that the town's position is that the planning board cannot simply impose 194 00:15:35,020 --> 00:15:39,220 a permanent buffer along the property line and that the landscaping provisions do not 195 00:15:39,220 --> 00:15:39,760 apply here. 196 00:15:40,240 --> 00:15:43,840 He suggested I raise the issue with the board and ask the property owner whether he would 197 00:15:43,840 --> 00:15:45,980 agree voluntarily to a buffer that could then be recorded. 198 00:15:46,560 --> 00:15:47,800 I would very much like to do that. 199 00:15:48,440 --> 00:15:52,820 Mr. Goldstein is not here, but I would ask whether he would agree to preserve a reasonable 200 00:15:52,820 --> 00:15:56,780 vegetated buffer along the lot 50 boundary and have that protection recorded as part 201 00:15:56,780 --> 00:15:57,440 of the subdivision. 202 00:15:57,440 --> 00:16:01,060 I'm not asking for an area in which no tree could ever be touched because the reasonable 203 00:16:01,060 --> 00:16:05,320 restriction could allow removal of dead or hazardous trees, management of invasive species 204 00:16:05,320 --> 00:16:09,520 necessary utility work while preserving the basic screening function of existing vegetation. 205 00:16:10,060 --> 00:16:14,160 I'd also like to raise one related question about Article 22 of the zoning ordinance. 206 00:16:15,820 --> 00:16:21,000 Section 175-114 says that the landscaping article applies to subdivisions where a new street 207 00:16:21,000 --> 00:16:21,580 is involved. 208 00:16:22,400 --> 00:16:26,340 And the town's zone material is described as a new private road and described the existing 209 00:16:26,340 --> 00:16:28,780 and try driveways being proposed for uses 210 00:16:28,780 --> 00:16:29,780 that new private road. 211 00:16:30,800 --> 00:16:33,600 Article 22 also speaks about retaining healthy forest cover 212 00:16:33,600 --> 00:16:35,900 and contemplates landscaping and reforestation plants 213 00:16:36,280 --> 00:16:37,900 that can provide screens and buffer strips 214 00:16:37,900 --> 00:16:38,760 and critical locations. 215 00:16:39,840 --> 00:16:41,680 I understand the town believes those provisions 216 00:16:41,680 --> 00:16:43,500 do not apply here because the physical driveway 217 00:16:43,500 --> 00:16:45,260 always already exists. 218 00:16:45,560 --> 00:16:46,580 I don't want to turn tonight's hearing 219 00:16:46,580 --> 00:16:48,680 to a legal argument about that interpretation, 220 00:16:49,000 --> 00:16:50,820 but I'd appreciate clarification of its basis. 221 00:16:52,000 --> 00:16:53,660 More importantly, whether the protection comes 222 00:16:53,660 --> 00:16:55,500 from Article 22 or through a voluntary agreement 223 00:16:55,500 --> 00:16:58,820 with the applicant, I think the underlying planning objective is the same, preserving 224 00:16:58,820 --> 00:17:02,680 the wooded character of the area and addressing a foreseeable impact of creating a new residential 225 00:17:02,680 --> 00:17:07,380 building lot. I also think it would be helpful for the applicants to show where a future 226 00:17:07,380 --> 00:17:12,600 house on this lot is reasonably anticipated to be located. The subdivision regulations 227 00:17:12,600 --> 00:17:17,340 forced up design process calls for potential building sites to be tentatively located 228 00:17:17,340 --> 00:17:21,820 before streets and lot lines are finalized. I'm not suggesting the ownership would necessarily 229 00:17:21,820 --> 00:17:25,440 be permanently bound to one exact footprint but without even a tentative building location 230 00:17:25,440 --> 00:17:29,360 it's difficult for the board or the abouters to understand how this new lot may actually affect 231 00:17:29,360 --> 00:17:34,020 the neighboring properties. My concern is if these questions are left entirely until later they may 232 00:17:34,020 --> 00:17:38,940 not be another meaningful opportunity to address them. Once the subdivisions recorded and otherwise 233 00:17:38,940 --> 00:17:43,220 conforming single-family house may proceed through the building permit process without returning to 234 00:17:43,220 --> 00:17:48,700 the planning board. So I'm asking for three things. First clarification of whether article 22 applies 235 00:17:48,700 --> 00:17:51,620 and if the town believes it does not the basis for that interpretation. 236 00:17:52,320 --> 00:17:56,000 Second, identification of at least a tentative future building location on the garage lot 237 00:17:56,000 --> 00:17:57,660 so that its impacts can be understood now. 238 00:17:58,260 --> 00:18:01,620 And third, and most importantly, I'm asking the applicant to agree to a reasonable recorded 239 00:18:01,620 --> 00:18:05,980 vegetative buffer along our common boundary with appropriate exceptions so the existing screening 240 00:18:05,980 --> 00:18:08,920 and wood character as part of Durham are not unnecessarily lost. 241 00:18:09,680 --> 00:18:12,940 I think that would allow the property to be developed to also provide some predictability 242 00:18:12,940 --> 00:18:14,800 and reasonable protection for the existing neighborhood. 243 00:18:15,320 --> 00:18:15,540 Thank you. 244 00:18:16,160 --> 00:18:16,500 All right. 245 00:18:22,320 --> 00:18:38,940 I'm sorry. I missed your name in the very beginning. I apologize. Jeff Rosenberger and in terms of in relation to the lot, which exact property are you on? 246 00:18:38,940 --> 00:18:51,450 So do you see where the proposed new line between the rear house and the one, the garage. 247 00:18:51,970 --> 00:18:58,150 So you're up on share water and so you back up your lot backs from share water backs up 248 00:18:58,150 --> 00:19:09,730 on the back of that. Yeah, sure, sure, water is over here. Yeah. Yeah. And I'm, yeah, I am 249 00:19:09,730 --> 00:19:17,890 looking at it and it looks like you're only the corner's meat between you and the garage 250 00:19:17,890 --> 00:19:18,190 lot. 251 00:19:21,070 --> 00:19:25,090 It's more than, it depends what you mean by corner. Like it's not just a corner. 252 00:19:30,050 --> 00:19:30,530 There's 253 00:19:33,870 --> 00:19:42,530 Yeah, it won't reach it won't reach I see that but but that property is that's 254 00:19:45,640 --> 00:19:47,220 for the existing house 255 00:19:48,180 --> 00:19:51,100 It's going to be a budding your rear line 256 00:19:52,660 --> 00:19:54,660 That's not what I see on the map 257 00:19:56,560 --> 00:20:02,540 Where the garage is yeah, it's the lot that they just think garage is on that about my property 258 00:20:03,760 --> 00:20:09,280 right so this is Michael yeah right that's the that's the new new proposed line 259 00:20:09,280 --> 00:20:18,560 right I'm I look at that I think that's the soils line okay let me so we have 260 00:20:18,560 --> 00:20:25,720 to show us the new property line she to she to yeah okay does extend further 261 00:20:25,720 --> 00:20:27,860 All right, very good, very good. 262 00:20:35,560 --> 00:20:36,120 And, 263 00:20:38,560 --> 00:20:41,020 right, so the do 264 00:20:46,260 --> 00:20:47,440 -do-do-do 265 00:20:54,800 --> 00:20:56,280 is there or is there. 266 00:20:56,920 --> 00:20:59,040 So she shows the 50-foot setbacks. 267 00:20:59,680 --> 00:21:02,080 It shows the 50-foot setbacks, which effectively 268 00:21:02,080 --> 00:21:04,160 creates two potential areas for a house. 269 00:21:05,500 --> 00:21:08,880 There's the one back there where the garage is now, 270 00:21:09,100 --> 00:21:12,360 and then there's one down near on the other side 271 00:21:12,360 --> 00:21:13,940 of the wetland at the corner. 272 00:21:21,120 --> 00:21:25,580 So those do do do and 273 00:21:28,360 --> 00:21:32,220 that's what I would consider to be potential build, you know, you're 274 00:21:32,220 --> 00:21:39,280 buildable areas with regards to that five and a half acre lot. 275 00:21:43,900 --> 00:21:53,320 Now, can we put sheep two up on the screen maybe so that and maybe even so we're discussing 276 00:21:56,760 --> 00:21:59,480 Mr. Rosenberg, you can see it as well as what's on him. 277 00:21:59,660 --> 00:22:00,720 So, yeah, so this is sheet two. 278 00:22:01,200 --> 00:22:01,600 Right. 279 00:22:03,140 --> 00:22:04,020 Yep, there. 280 00:22:04,420 --> 00:22:06,420 So, in terms of the. 281 00:22:07,640 --> 00:22:09,860 You can see the whole lot. 282 00:22:09,860 --> 00:22:11,160 Yeah, so you can see the whole lot. 283 00:22:11,480 --> 00:22:11,580 Yeah, fine. 284 00:22:11,840 --> 00:22:12,000 Okay. 285 00:22:12,340 --> 00:22:12,880 All right, yes. 286 00:22:13,320 --> 00:22:17,760 So, this view shows the two potential areas where a housing. 287 00:22:18,060 --> 00:22:19,140 A house could be built. 288 00:22:21,880 --> 00:22:30,840 And we generally do that to ensure that setbacks and such are capable of being done because 289 00:22:30,840 --> 00:22:38,400 they'll need to run sewer and well on this as well. 290 00:22:38,700 --> 00:22:38,860 Correct. 291 00:22:39,000 --> 00:22:42,060 They'll need a subsequent well there. 292 00:22:42,140 --> 00:22:42,360 Yeah. 293 00:22:44,700 --> 00:22:47,960 So we have on sheet three, which is up on the screen now. 294 00:22:47,960 --> 00:22:54,040 So we shall propose a well location just downhill towards the Scaticor road at the garage. 295 00:22:54,740 --> 00:23:00,340 And we've done two test pits showing suitable soils for a septic system. 296 00:23:00,740 --> 00:23:02,580 That's not saying that it has to go there. 297 00:23:03,280 --> 00:23:05,900 But that's the biggest area to build. 298 00:23:06,400 --> 00:23:13,220 And most likely the house would be uphill of that to have the septic go gravity to a leaching area. 299 00:23:13,220 --> 00:23:18,860 Yeah, that's the stoke it confused. That's the soil line cutting through a little not the lot 300 00:23:21,520 --> 00:23:25,300 Which which direction and you said uphill by I can't read that 301 00:23:25,300 --> 00:23:31,660 So actually there's a little mound so the garage sits on a little knob and 302 00:23:32,840 --> 00:23:34,060 So they can go uphill 303 00:23:34,820 --> 00:23:36,300 slightly towards the 304 00:23:37,260 --> 00:23:39,760 Existing house on not 42 305 00:23:39,760 --> 00:23:43,160 two, so there's a couple of different places they could build. 306 00:23:44,140 --> 00:23:45,900 They could add to the existing garage. 307 00:23:47,100 --> 00:23:50,020 It's all within the setbacks, and they 308 00:23:50,020 --> 00:23:51,820 could make the sewer work with the test pitch shown. 309 00:23:55,260 --> 00:23:58,980 So it would most likely be either towards the existing house 310 00:23:58,980 --> 00:24:01,780 or towards the garage and not towards the back. 311 00:24:03,340 --> 00:24:11,900 Like my abutting line, or it would be unlikely. 312 00:24:12,560 --> 00:24:14,540 I mean, at least field could go elsewhere, too. 313 00:24:15,380 --> 00:24:21,580 Leach field could go elsewhere, it could probably slide down the hill and build it up a little bit if they wanted to. 314 00:24:21,780 --> 00:24:22,780 Yeah, correct, in the house. 315 00:24:23,500 --> 00:24:32,740 We did two test pits to prove for the subdivision that it's suitable soils so they could put the septic closer to lot 42's house and build right behind the garage. 316 00:24:34,080 --> 00:24:37,220 They could build a house right where it says, proposed 4K leaching area. 317 00:24:39,000 --> 00:24:47,200 So there's a pretty substantial building envelope there, and with no plans to build at the moment, it's hard to say, this is where the house is going to go. 318 00:24:58,340 --> 00:24:59,060 Thoughts, people? 319 00:25:00,740 --> 00:25:15,740 So Michael, just refresh us all, or particularly at least me anyway, with regard to the 50 foot setback there, what are the provisions in terms of maintaining any vegetative buffer that's there now? 320 00:25:15,740 --> 00:25:18,780 No, there's none. It's only a setback from structures. 321 00:25:22,760 --> 00:25:24,620 In that area is vegetated now. 322 00:25:25,200 --> 00:25:25,300 Yeah. 323 00:25:25,540 --> 00:25:26,000 Where's that here? 324 00:25:27,340 --> 00:25:28,400 Is it lots of trees? 325 00:25:29,160 --> 00:25:29,260 Yep. 326 00:25:30,480 --> 00:25:33,960 Yeah, I have the plan to overlay it on a satellite photo if it's helpful. 327 00:25:34,260 --> 00:25:34,420 Yeah. 328 00:25:37,260 --> 00:25:42,420 That existing garage that's there, can you see that from your property right now? 329 00:25:43,060 --> 00:25:44,760 Right now, no, in the winter, yes. 330 00:25:45,440 --> 00:25:47,320 Right, when the leaves drop, yes. 331 00:25:47,320 --> 00:25:52,900 But yeah, I didn't know it was there or the existing house for that matter until the first 332 00:25:52,900 --> 00:25:53,800 winter we were here. 333 00:25:54,020 --> 00:25:54,120 Yeah. 334 00:25:54,500 --> 00:25:57,560 At least drop and say, where's the driveway for that house? 335 00:26:10,660 --> 00:26:16,480 You're not, you haven't really had discussions with the owner regarding a vegetative buffer. 336 00:26:18,100 --> 00:26:20,140 No, this is the first time it's come up. 337 00:26:20,140 --> 00:26:31,720 I don't want to necessarily agree to leaving the buffer, but I assume anyone who builds here also doesn't want to look at the back of Mr. Rosenberg's house. 338 00:26:32,860 --> 00:26:36,520 People moved to Durham for the natural state of the land. 339 00:26:37,540 --> 00:26:42,720 So no one, I don't foresee someone building a house there, clear-cutting the lot to look into his backyard. 340 00:26:44,740 --> 00:26:45,960 That's just the way I see it. 341 00:26:47,120 --> 00:26:53,940 Yeah, it's not, I would agree with you that building lot there in that kind of middle area, 342 00:26:55,740 --> 00:27:01,140 you would see it, but you already see the other existing homes for other existing buildings, 343 00:27:01,440 --> 00:27:07,080 but that vegetation, it would be highly unlikely and not very logical for somebody to take 344 00:27:07,080 --> 00:27:10,900 it down in it, great expense to, I mean, they could have just said something clear cut it, 345 00:27:10,900 --> 00:27:30,060 But how would we deal with there's no way we can guarantee that and even I mean what is the what is the abilities of the owner of the lot to create that this falls into that the 346 00:27:32,870 --> 00:27:38,730 applicant if Mr. Goldstein the owner agreed to he could 347 00:27:38,730 --> 00:27:40,210 We could agree to anything as part of something. 348 00:27:40,830 --> 00:27:42,410 Are you going to make that a condition of approval? 349 00:27:42,410 --> 00:27:44,050 The planning board cannot require this. 350 00:27:44,410 --> 00:27:48,650 That becomes a question of whether or not the owner 351 00:27:48,650 --> 00:27:53,450 would want to do that on their own, 352 00:27:53,590 --> 00:27:56,570 which they could also simply do within the deed. 353 00:27:57,210 --> 00:27:57,970 Yep, they could. 354 00:28:00,400 --> 00:28:05,060 In fact, it probably is stronger if it's done via the deed. 355 00:28:09,300 --> 00:28:17,900 But it goes back to the statement of, you know, we can't offer single family houses from 356 00:28:17,900 --> 00:28:25,400 single family houses, that's not within, as much as it sounds like as we should be able 357 00:28:25,400 --> 00:28:27,940 to have the authority for that, we don't. 358 00:28:29,320 --> 00:28:38,160 So my only point on that regard is whether the Article 22 of the zoning ordinance applies. 359 00:28:38,160 --> 00:28:39,920 I was going to move on to that next. 360 00:28:40,800 --> 00:28:47,300 So with regards to the private road being a new road. 361 00:28:48,500 --> 00:28:55,620 But in Article 22, that applies only to the common open space at a conservation subdivision. 362 00:28:55,620 --> 00:29:00,980 But there's landscaping provisions there, but they don't apply to a conventional single-family line. 363 00:29:01,240 --> 00:29:05,340 So those are for conservation subdivision, that's a different, that's not the article. 364 00:29:05,640 --> 00:29:07,500 It doesn't say that. 365 00:29:20,260 --> 00:29:23,240 I'm pulling it up as well. 366 00:29:27,070 --> 00:29:28,890 It says, this is the landscaping. 367 00:30:00,110 --> 00:30:09,830 Yeah, I mean, all of it, it's intent, it's, it's a common area as you, you, it would not be legal to impose these things on individual single-family laws. 368 00:30:10,810 --> 00:30:25,090 But it's, it's like an imposed on a sudden land, trees of special interest. I mean, theoretically, you could if there was, if there was, for example, trees of special number four, trees of special interest. 369 00:30:25,770 --> 00:30:26,330 You know, 370 00:30:31,240 --> 00:30:35,420 for example, if there was a great tree on an individual lot, you could specify 371 00:30:35,420 --> 00:30:36,960 that that tree be protected. 372 00:30:40,960 --> 00:30:47,260 You know, if there were, as part of a subdivision, if you identify specific resources on individual 373 00:30:47,260 --> 00:30:56,780 lots, stone walls, archaeological resources, you could require that those, specify those 374 00:30:56,780 --> 00:31:07,060 be preserved on individual lots, but not, you know, broader, you know, natural areas 375 00:31:07,060 --> 00:31:08,760 be preserved as wooded areas. 376 00:31:09,640 --> 00:31:21,160 Yeah, I understand where Mr. Rosenberger is confused because the opening paragraph does 377 00:31:21,160 --> 00:31:24,700 So does blend itself to be misinterpreted? 378 00:31:24,920 --> 00:31:25,140 It does. 379 00:31:25,840 --> 00:31:26,100 Yeah. 380 00:31:32,970 --> 00:31:35,430 That's one of the things I'm going to show you next week. 381 00:31:35,950 --> 00:31:36,430 Revisions. 382 00:31:36,750 --> 00:31:38,030 I'm trying to clean this up. 383 00:31:38,550 --> 00:31:38,790 All right. 384 00:31:39,650 --> 00:31:41,050 So one more question. 385 00:31:41,050 --> 00:31:43,330 Procedural question for Michael, please. 386 00:31:44,990 --> 00:31:48,550 If Mr. Rosenberger wanted to contact the current owner 387 00:31:48,550 --> 00:31:52,990 and talk about creating some sort of buffer that 388 00:31:52,990 --> 00:31:56,130 might be recorded in a deed, is that 389 00:31:56,890 --> 00:32:05,270 And if the applicant now was agreeable to that, could that become a part of the condition of the variance 390 00:32:05,270 --> 00:32:05,470 painting? 391 00:32:05,910 --> 00:32:13,530 Yeah, I would suggest including a condition on this that I would suggest approving it if there's no significant 392 00:32:13,530 --> 00:32:21,830 concerns, and including a condition on here under planned modifications that in the event that this 393 00:32:21,830 --> 00:32:33,410 This gentleman works out some arrangement with the property owner, and the property owner is willing to include that as a condition of approval, that will be identified on the final plans. 394 00:32:34,910 --> 00:32:37,370 So that might be an option for you to pursue. 395 00:32:38,250 --> 00:32:43,250 Yeah, if you approve the plans with the condition of maybe doing that in the future. 396 00:32:43,250 --> 00:32:43,490 That? 397 00:32:44,170 --> 00:32:44,670 No. 398 00:32:44,890 --> 00:32:49,150 What I was asking the question, the procedural question is, if you spoke with the current 399 00:32:49,150 --> 00:32:57,550 owner of the applicant and he was agreeable to put in some sort of buffer for 30 feet 400 00:32:57,550 --> 00:33:03,650 or whatever along the property line near your house, that could be conveyed to the planning 401 00:33:03,650 --> 00:33:08,850 board by the applicant and that could become, then, a condition of the variance being 402 00:33:08,850 --> 00:33:10,330 granted in the future, if I understand. 403 00:33:10,330 --> 00:33:16,910 So yeah, I mean, that can you could take action on this application tonight and include that contingent condition. 404 00:33:17,550 --> 00:33:27,190 So you say you approve it tonight and in a week or two or a month, Mr. Goldstein tells me I'm okay with a 50 foot non-wooded buffer. 405 00:33:27,730 --> 00:33:33,870 I'm okay with that being a condition, then Mr. Bairry includes it on the recorded plans. 406 00:33:33,870 --> 00:33:40,110 Yes, but if he says no, then he never gets back to you. 407 00:33:40,430 --> 00:33:45,610 We have a contingent and we don't know what there's nothing in it. 408 00:33:46,490 --> 00:33:51,150 Somebody who picks us up five years from now, there's nothing for the person to know what 409 00:33:51,150 --> 00:33:52,030 the answer was there. 410 00:33:52,150 --> 00:33:58,950 So you could give it like a time of month if nothing is agreed to within say a month after 411 00:33:58,950 --> 00:34:01,590 approval that it nothing happens. 412 00:34:01,790 --> 00:34:02,550 It just goes away. 413 00:34:02,550 --> 00:34:04,170 Yeah, because we can't require it. 414 00:34:04,290 --> 00:34:05,270 No, no. 415 00:34:06,410 --> 00:34:07,730 But I know Mr. Goldstein. 416 00:34:07,910 --> 00:34:09,730 I mean, I'm sure he would give us an answer. 417 00:34:13,870 --> 00:34:16,050 So does that mean we would take action on it tonight? 418 00:34:16,370 --> 00:34:18,130 Or would we would take action on it tonight? 419 00:34:18,130 --> 00:34:18,350 We would take action on it tonight. 420 00:34:19,010 --> 00:34:22,490 There would be this effectively a contingence, 421 00:34:22,750 --> 00:34:27,790 a precedent condition of Mr. Goldstein getting back to us, 422 00:34:27,930 --> 00:34:30,510 telling us whether or not there's going to be a buffer. 423 00:34:31,030 --> 00:34:32,390 Yeah, I mean, he could just tell me, 424 00:34:32,390 --> 00:34:40,110 And then I would let Mr. Barry know on your final plans, show this buffer or not, you know, the way they are. 425 00:34:40,650 --> 00:34:42,030 So it's pretty, it's pretty simple. 426 00:34:42,670 --> 00:34:51,630 So you would, in the wording, you would say, if that arrangement does happen that the said situation shall be put on. 427 00:34:51,670 --> 00:34:52,930 Showing on the plans accordingly. 428 00:34:53,310 --> 00:34:53,890 And, and be a condition. 429 00:34:53,890 --> 00:34:55,510 And recording is part of the deep way. 430 00:34:55,830 --> 00:34:56,310 Right, right. 431 00:34:56,310 --> 00:35:02,490 Or do we want to be that presumptuous that that's agreeable or simply ask for the 432 00:35:03,670 --> 00:35:10,430 a butter and the applicant to have a conversation and get back to the board within two weeks before the next meeting? 433 00:35:11,550 --> 00:35:13,010 You could do that if 434 00:35:13,010 --> 00:35:14,330 and see what they work out. 435 00:35:14,510 --> 00:35:21,350 But it's it's ready to be approved and if Mr. Berry wants really wants action tonight, 436 00:35:21,830 --> 00:35:25,530 It would not be, I don't think it would be appropriate to delay that. 437 00:35:26,090 --> 00:35:29,030 But maybe if they're not in any rush, maybe they'd do only to do that. 438 00:35:29,310 --> 00:35:33,210 I mean, we would like action tonight and we can have that conversation. 439 00:35:33,770 --> 00:35:38,190 It's unfortunate that it looks like the trees were cut on the butting lot all the way to the lot line. 440 00:35:39,930 --> 00:35:46,450 So now we have the buffer on our lot, I'm guessing Mr. Goldstein might be willing to do something. 441 00:35:46,450 --> 00:35:58,070 If you look at the existing house on not 42, there's 150 feet worth of trees still left fully wooded, so I don't anticipate that area to be cut, but I would leave. 442 00:35:58,250 --> 00:36:06,410 I would be willing to leave it at work it out with the landowners, we can put it on the final recorded plan if a buffer was a creed to. 443 00:36:09,230 --> 00:36:17,010 My preference would be, let's wrap this up tonight, with that intent, so the neighbors 444 00:36:17,010 --> 00:36:19,090 can work out what it's going to be. 445 00:36:21,630 --> 00:36:27,830 Mr. Barrett will write up the contingency item, whatever you'd like to. 446 00:36:27,830 --> 00:36:32,110 Yeah, it would be along the lines, I would add this as a condition for underplan modifications. 447 00:36:32,110 --> 00:36:53,110 In the event that this gentleman, this gentleman has the option if he wishes to speak with the property owner and request some sort of buffer on this lot, in the event that the property owner agrees to that and agrees to make that a condition of approval, this will be incorporated into the final recorded plans. 448 00:36:55,290 --> 00:37:04,230 If the owner does not agree to anything, then nothing will be, no changes will be made, and you could put a time limit if you wish. 449 00:37:04,890 --> 00:37:11,650 But by the time, even if I don't hear otherwise from Mr. Goldstein, then it's assumed it's not happening. 450 00:37:11,950 --> 00:37:16,330 And then they would just give us the final plans and a month or two and record them. 451 00:37:17,270 --> 00:37:20,870 This pretty calm is no, I don't see any issues with this. 452 00:37:21,730 --> 00:37:29,750 But just to speak to that, just for one second, it seems like this is the point of a public 453 00:37:29,750 --> 00:37:38,650 comment, which is to raise a concern, and an abutters raised a concern that seems like 454 00:37:38,650 --> 00:37:45,290 a real concern, and that if we move forward in the manner that I think is being proposed, 455 00:37:45,910 --> 00:37:48,750 it seems like sort of all the wind is out of the sail, if you will. 456 00:37:48,750 --> 00:38:03,570 And so the time to have the concern dealt with seems like it would be now, while there's a public concern that's raised and while it's in front of us, before it moves forward and sort of becomes non-existent. 457 00:38:04,190 --> 00:38:15,330 So I would, it would seem to me that we may want to pause on that for a brief period of time and see if the two parties can sort of work something out that then is, 458 00:38:15,330 --> 00:38:22,730 let's say codified in some language or then that we can look at and know that 459 00:38:22,730 --> 00:38:27,390 something's taken place. So I would sort of pause, I think, on this a little and 460 00:38:27,390 --> 00:38:31,870 say that we've heard a public comment, the public comment seems to me to be 461 00:38:31,870 --> 00:38:38,650 real and that we may want to pause on that and not move forward. That's just the 462 00:38:38,650 --> 00:38:43,770 thought. And I guess given the fact that we have a meeting in one week this could 463 00:38:43,770 --> 00:38:50,570 be dealt with rather rapidly if the board is willing to say, okay, we can take five minutes 464 00:38:51,090 --> 00:38:58,930 at the beginning of the next meeting and if they've got an agreement cemented, gets voted 465 00:38:58,930 --> 00:39:03,570 on and it's approved, so when we delay, if they don't then go ahead and improve it anyway. 466 00:39:04,630 --> 00:39:12,870 My only concern is the only reason for us to delay would be because of something that we 467 00:39:12,870 --> 00:39:15,630 We don't have the purview over, we don't have the right to stop anyways. 468 00:39:16,330 --> 00:39:24,110 And that's my only point of contention in waiting is that we don't have the right to stop, 469 00:39:25,150 --> 00:39:34,050 to acquire it, and we don't have the right to tell anybody they can't, you know, cut 470 00:39:34,050 --> 00:39:36,450 up to their boundary line if they want to. 471 00:39:38,350 --> 00:39:45,430 So I just feel that I think the scenario that Michael point, you know, kind of laid out 472 00:39:45,430 --> 00:39:47,570 is probably the best way to go that way. 473 00:39:48,590 --> 00:39:53,610 They can get it taken care of, and we're not holding them up for something that we don't 474 00:39:53,610 --> 00:39:57,230 really have the right to hold them up for, might be. 475 00:39:57,750 --> 00:40:04,470 I agree with Sally and I think we should move on to see if anyone else has anything at 476 00:40:04,470 --> 00:40:13,130 public hearing. So I agree. Thank you. Okay. Thank you, Mr. Rosenberg. Are there any other 477 00:40:13,130 --> 00:40:14,690 public comments? 478 00:40:19,260 --> 00:40:22,900 Anybody that I know if we close the public hearing? Second. 479 00:40:25,930 --> 00:40:26,850 All in favor? 480 00:40:31,940 --> 00:40:37,940 So I'm with Sally and Julian. I think that, you know, we don't have a reason to not take action 481 00:40:37,940 --> 00:40:47,860 tonight. But we can continue, we can set up the, set the table for the neighbors to have a discussion 482 00:40:47,860 --> 00:40:53,900 and to come to an agreement that can be included within the action. 483 00:40:56,380 --> 00:40:57,620 Is that acceptable to everybody? 484 00:40:57,620 --> 00:41:03,720 Just a question for Michael first, and I agree with this, but could you clarify 485 00:41:03,720 --> 00:41:08,240 By deed versus dealing with this in the deed that is outside the planning board 486 00:41:08,240 --> 00:41:10,820 process as opposed to the subdivision plan. 487 00:41:11,260 --> 00:41:14,340 That's an option that's not involved. 488 00:41:14,460 --> 00:41:22,200 If you didn't want to deal with this at all, then Mr. Rosenberg could still talk to Mr. Goldstein. 489 00:41:22,260 --> 00:41:25,140 They could do that privately with the deed, independent of the board. 490 00:41:28,280 --> 00:41:32,300 But there is an advantage, I mean, if they do come to agreement, there's a benefit to 491 00:41:32,300 --> 00:41:33,100 on the plan. 492 00:41:33,480 --> 00:41:33,940 Yes, I understand. 493 00:41:38,820 --> 00:41:39,300 The discussion? 494 00:41:39,500 --> 00:41:40,300 Is this making noise? 495 00:41:40,960 --> 00:41:41,040 No. 496 00:41:42,140 --> 00:41:42,340 Okay. 497 00:41:45,080 --> 00:41:45,440 All right. 498 00:41:45,600 --> 00:41:46,580 So any further discussion? 499 00:41:48,520 --> 00:41:49,620 Oh, Mr. Chair, I'm sorry. 500 00:41:50,200 --> 00:41:52,600 Just one other item I realized should be added. 501 00:41:53,340 --> 00:42:01,620 Under Plan Notes, a condition 8, that should say any new electric lines serving 502 00:42:01,620 --> 00:42:03,440 the lots shall be placed underground. 503 00:42:03,920 --> 00:42:04,660 Plan notes. 504 00:42:04,660 --> 00:42:10,740 just so there's no question about that which would be the vacant lot a lot 505 00:42:10,740 --> 00:42:16,480 with the garage plan notes on this school impact fees number eight yeah just 506 00:42:16,480 --> 00:42:22,860 added in there anywhere under plan notes okay now do we have to have a separate 507 00:42:22,860 --> 00:42:29,840 motion to prove the waivers you can if you want or you can just we can do it as 508 00:42:29,840 --> 00:42:31,520 Part of the full approval. 509 00:42:33,660 --> 00:42:34,300 All 510 00:42:36,610 --> 00:42:42,370 right, so the modification to would be the electrical, 511 00:42:42,370 --> 00:42:43,310 you just mentioned. 512 00:42:43,770 --> 00:42:43,950 Yeah. 513 00:42:44,490 --> 00:42:48,610 And this plan modification note. 514 00:42:49,350 --> 00:42:51,270 With the regarding a buffer. 515 00:42:51,570 --> 00:42:52,050 Regarding a buffer. 516 00:42:52,170 --> 00:42:52,310 In the event. 517 00:42:52,930 --> 00:42:54,210 Yes, amenable. 518 00:42:54,550 --> 00:42:55,010 All right. 519 00:42:55,370 --> 00:42:59,470 So those are the two modifications to the notice of decision 520 00:42:59,470 --> 00:43:03,510 tonight. You're okay with the notice of decision otherwise? 521 00:43:03,930 --> 00:43:05,710 Yep. I mean, I'm okay with those two new ones. 522 00:43:08,010 --> 00:43:11,650 Okay. And I 523 00:43:13,820 --> 00:43:22,740 will move that we approve a three-lot subdivision with a private road at 73 524 00:43:22,740 --> 00:43:29,720 Piscatical Road, property owner William Goldstein, map 209, lap 42 in the residents' coastal 525 00:43:29,720 --> 00:43:38,100 district per the modified notice of decision of September 23rd, 2026. 526 00:43:38,840 --> 00:43:48,500 Second. Any further discussion? All in favor? Aye. Aye. Opposed? All right. 527 00:43:48,980 --> 00:43:50,740 I'll abstain. One abstention. 528 00:43:52,840 --> 00:43:58,400 All right. Thank you. Thank you very much. Good luck with your conversation. 529 00:44:11,910 --> 00:44:32,650 The next item will be a public carrying for 121 technology drive, light industry buildings, site plan application for two light industrial or warehouse buildings, each with 160,000 square feet, 450 parking spaces and other improvements, conditional use application for activity within 75 foot wetland buffer, lot line adjustment application. 530 00:44:34,310 --> 00:44:36,670 R.J. Kelly, here's Sean Smith, owner, 531 00:44:36,790 --> 00:44:40,270 budget Susan, Matt Peterson for Keach Nordstrom Engineer, 532 00:44:40,510 --> 00:44:43,430 Matt 204, lots one in two in the office research 533 00:44:43,430 --> 00:44:44,910 light industry district. 534 00:44:45,610 --> 00:44:48,950 Focus of the discussion will be on storm water 535 00:44:48,950 --> 00:44:51,070 and the conditional use request tonight. 536 00:44:59,150 --> 00:44:59,970 Just one. 537 00:45:00,000 --> 00:45:02,260 All in a minute, Mr. Chair, well, I guess you're right. 538 00:45:04,740 --> 00:45:09,760 We're definitely going to want to see your drawings or data. 539 00:45:21,760 --> 00:45:33,940 So, Matt Peterson is not with us this evening. But we do have Brendan Quigley and Bridgett here. And for the record, Sean Smith, RJ Kelly, co, you're on behalf of ownership. 540 00:45:36,200 --> 00:45:41,680 As I pull up my PC here, we'll get going in. Mr. Chair, as you stated, 541 00:45:41,680 --> 00:45:46,280 We'll be focusing on the conditional use permits and the storm water the 542 00:45:46,280 --> 00:45:51,340 evening to give a little bit more color on the storm water specifically. 543 00:45:52,180 --> 00:46:01,420 And have a conversation about the two conditional uses that we have proposed here to discuss and have a conversation. 544 00:46:01,860 --> 00:46:01,860 So 545 00:46:19,070 --> 00:46:27,910 would the board prefer to start on any particular item or otherwise I think we'd probably start with the storm water piece. 546 00:46:27,910 --> 00:46:28,650 Start water, please. 547 00:46:42,120 --> 00:46:44,440 Show us where the water goes. 548 00:46:44,780 --> 00:46:46,040 It's the name of the presentation. 549 00:46:46,320 --> 00:46:47,160 I'll have to be up here. 550 00:46:47,840 --> 00:46:48,240 This way. 551 00:46:48,500 --> 00:46:48,540 Yeah. 552 00:46:48,700 --> 00:46:48,880 Okay. 553 00:46:51,750 --> 00:46:53,010 Thank you for your patience. 554 00:46:58,340 --> 00:46:58,660 All right. 555 00:46:58,820 --> 00:47:02,460 So Bridgette will do most of the talking on this one. 556 00:47:02,540 --> 00:47:04,000 She's the one who designed everything here. 557 00:47:04,180 --> 00:47:06,980 So she can give you a good rundown of how things are working. 558 00:47:07,120 --> 00:47:08,580 And I'll just try to keep up, I guess. 559 00:47:08,840 --> 00:47:08,920 Yeah. 560 00:47:09,500 --> 00:47:14,060 And we can send this to you guys after this meeting so that the entire 561 00:47:14,060 --> 00:47:15,740 board can take a look at it a little more detailed. 562 00:47:15,740 --> 00:47:23,400 but essentially this is the Great and Endrainage Plan. I did a full site overview for you guys for 563 00:47:23,400 --> 00:47:32,700 readability. In the green lines, those are the subcatchment areas that are a part of the 564 00:47:32,700 --> 00:47:39,890 drainage analysis. So it's like the area breakout that goes to each drainage structure, whether that's 565 00:47:39,890 --> 00:47:43,410 roof drain or a catch basin or directly to a pond. 566 00:47:44,470 --> 00:47:48,130 In the purple, we have the actual drain lines. 567 00:47:49,750 --> 00:47:54,290 And then I also circled all of the catch basin locations 568 00:47:54,290 --> 00:47:58,710 in red and the roof drain locations in orange. 569 00:48:01,250 --> 00:48:04,170 And then I included some flow arrows on here. 570 00:48:04,410 --> 00:48:06,250 So if you want to just zoom into any section. 571 00:48:07,170 --> 00:48:13,410 So the dashed arrow line, that is also taken from our drainage analysis and it just shows, 572 00:48:13,830 --> 00:48:19,110 I got to adjust them a little bit, but it just shows the flow path to the catch basins 573 00:48:19,110 --> 00:48:26,850 and then I have a directional arrow on all the purple drain lines just showing the flow of direction. 574 00:48:28,450 --> 00:48:30,430 You want to zoom into this area. 575 00:48:30,430 --> 00:48:34,250 So we'll start with the catch basins, right? 576 00:48:34,450 --> 00:48:42,350 So when it rains out, stormwater is directed to one or of many catch basins on this property. 577 00:48:43,030 --> 00:48:51,530 The entire perimeter is curved, so any stormwater that hits pavement within this new proposed 578 00:48:51,530 --> 00:48:54,490 area is captured by a catch basin. 579 00:48:54,490 --> 00:49:03,650 The catch basins are equipped with a snout and that snout's purpose is to prevent floatables 580 00:49:03,650 --> 00:49:11,670 like trash, leaves, debris, as well as hydrocarbons, so any oils, petroleum that might come 581 00:49:11,670 --> 00:49:18,550 off of a car or a truck would be on the surface of that standing water in the catch basin. 582 00:49:19,470 --> 00:49:24,490 And then any heavy sediment would fall out in that structure. 583 00:49:25,310 --> 00:49:30,090 So in our operation and maintenance plan, we include a schedule for these structures 584 00:49:30,090 --> 00:49:31,070 to be inspected. 585 00:49:31,630 --> 00:49:40,750 And then the standard protocol is once the deep sump is approximately a third full, that 586 00:49:40,750 --> 00:49:45,490 requires it to be cleaned out so that it can continue to capture some of that sediment prior 587 00:49:45,490 --> 00:49:48,370 to moving downstream to our treatment structures. 588 00:49:49,930 --> 00:49:52,750 The snouts actually have a vent on them as well. 589 00:49:52,930 --> 00:49:55,350 I think it's important to point out. 590 00:49:56,110 --> 00:49:59,870 So it just prevents siphoning in larger storms. 591 00:50:00,290 --> 00:50:04,690 It removes that chance for a vacuum, 592 00:50:05,010 --> 00:50:08,590 so that those hydrocarbons in the trash stay on the surface 593 00:50:08,590 --> 00:50:10,690 of that water where the inlet comes in. 594 00:50:12,110 --> 00:50:14,090 So from the catch basins, it moves 595 00:50:14,090 --> 00:50:20,870 through a series of pipes to drain manhole structures and eventually to one of four 596 00:50:20,870 --> 00:50:26,310 ponds on the site? If we could just pause for a minute. Are there any questions on how 597 00:50:26,310 --> 00:50:31,250 this catch basin sort of functions as its first step? One question, your presentation. 598 00:50:31,590 --> 00:50:36,810 Thank you. Just curiosity questions. So in terms of the capacity, I assume this is like a typical 599 00:50:36,810 --> 00:50:43,890 catch basin, but if there was a spill from say a truck diesel tank, 80 gallons or so spill, 600 00:50:44,250 --> 00:50:49,070 what's the capacity of one catch basin to hold 80 gallons of fiber carbon? 601 00:50:50,410 --> 00:50:57,690 I don't have the exact number off the top of head, but typically the snouts are about 12 inches 602 00:50:57,690 --> 00:50:58,690 It is below the outlet. 603 00:51:00,030 --> 00:51:09,110 So you're talking about a foot within a four or five foot structure, quick math in my 604 00:51:09,110 --> 00:51:09,290 head. 605 00:51:10,130 --> 00:51:15,670 I do think it's a point to note on an event such as that. 606 00:51:16,230 --> 00:51:18,690 The first step is spill response, right? 607 00:51:19,270 --> 00:51:27,670 Every single user of that nature would be required to have spill response get the 608 00:51:27,670 --> 00:51:32,710 It's on site adequate to manage something of their larger nature, right? 609 00:51:33,230 --> 00:51:37,950 So absorb to the pads, some people throw kiddie litter and nobody really does that anymore. 610 00:51:38,530 --> 00:51:42,470 But anything that would soak up the oils and prevent it from running off and then be 611 00:51:42,470 --> 00:51:46,150 able to collect it in a way that it would keep it from getting here at first place, right? 612 00:51:46,570 --> 00:51:52,470 So a spill like that is normally handled immediately on site in that particular location before it 613 00:51:52,470 --> 00:51:56,010 gets to one of these any sort of residual would be the point of this basis. 614 00:51:56,970 --> 00:52:00,330 How many catchabasants will there be for these two new buildings? 615 00:52:01,010 --> 00:52:04,530 I don't know the exact number we can zoom out. 616 00:52:04,650 --> 00:52:05,950 There's quite a few. 617 00:52:07,830 --> 00:52:12,050 Now you can see every, I am sorry I'm about to run here, every single one of these red dots. 618 00:52:12,650 --> 00:52:13,990 Is it catchabas? 619 00:52:14,010 --> 00:52:14,770 Is it catchabas? 620 00:52:14,950 --> 00:52:16,190 And they all have a snout, right? 621 00:52:16,330 --> 00:52:17,930 Yeah, they would all be equipped with one. 622 00:52:17,930 --> 00:52:32,850 So especially in the lines that are sequential from a catch basin to a catch basin to a catch basin there be more capacity to collect even more hydrocarbons. 623 00:52:33,330 --> 00:52:33,450 Okay. 624 00:52:33,870 --> 00:52:33,910 Yeah. 625 00:52:34,650 --> 00:52:40,270 What percent of catch basins installed on projects do you have that snout feature? 626 00:52:41,910 --> 00:52:50,110 Nowadays most of them, it's pretty much a requirement or something that engineers just 627 00:52:50,110 --> 00:52:55,110 automatically include now, whether a town has that requirement not, it just depends 628 00:52:55,110 --> 00:52:59,550 town to town, but it's pretty much an engineering standard practice now to always include 629 00:52:59,550 --> 00:53:00,050 one of those. 630 00:53:00,690 --> 00:53:06,290 I would say in New Hampshire specifically, because we do work in both like Massachusetts 631 00:53:06,290 --> 00:53:12,170 New Hampshire, other areas in New England, sometimes you have like an area drain or catch 632 00:53:12,170 --> 00:53:16,530 basin that does not collect runoff from a paved surface or something that would be exposed 633 00:53:16,530 --> 00:53:23,070 to vehicular runoff or the potential for lights amounts of oils that just so happen to fall 634 00:53:23,070 --> 00:53:30,710 off as people's offerings is what they do. Sometimes those don't come with the sound, but in general 635 00:53:30,710 --> 00:53:32,810 in this sort of application you almost always see them. 636 00:53:35,010 --> 00:53:36,630 All right. Any more questions? 637 00:53:36,630 --> 00:53:37,630 What were on the oil? 638 00:53:38,470 --> 00:53:49,370 Do most of the spill response plans start at those catch basins, or do they wait until the oil is migrated to the retention of detention? 639 00:53:50,350 --> 00:53:56,870 No, those are immediate, so like there's something on the pavement, we've got to soak it up and get ready. 640 00:53:57,670 --> 00:53:57,730 Yep. 641 00:53:59,860 --> 00:54:03,420 And a lot of those businesses, like they're required to have that prepared. 642 00:54:03,420 --> 00:54:12,480 and it's reviewed and submitted to either the state or federal all right so for the upper 643 00:54:12,480 --> 00:54:18,240 parking area and the lower parking area so the parking areas to the north and the south and then 644 00:54:18,240 --> 00:54:27,660 the drive aisle around the perimeter those series of catch basins pipes and manholes they are directly 645 00:54:29,500 --> 00:54:33,340 connected to one of three gravel wetlands. 646 00:54:34,240 --> 00:54:37,680 The parking court for the tractor trailers in the middle, 647 00:54:38,180 --> 00:54:41,600 that first goes to a dry detention pond. 648 00:54:42,440 --> 00:54:44,360 So it comes into a sediment for bay. 649 00:54:45,020 --> 00:54:51,520 Sediment for bay allows more time for sediments to fall out. 650 00:54:52,180 --> 00:54:56,160 It slows the velocity of storm water coming into the pond. 651 00:54:56,160 --> 00:55:02,340 So those larger storms where you're seeing a larger volume of water. It dissipates that velocity of the water 652 00:55:03,460 --> 00:55:08,780 From there it spills over into the storage area. I just included a 653 00:55:08,780 --> 00:55:13,980 picture of a typical dry detention. You can see the inlet area 654 00:55:14,660 --> 00:55:23,860 There is some stone rip wrap there. R is more of what would be required for a full pond even though a dry detention 655 00:55:23,860 --> 00:55:29,460 Pond doesn't provide treatment per New Hampshire standards. 656 00:55:29,800 --> 00:55:37,580 We wanted to make sure we included an actual structural sediment for bay to allow more time for sediment fallout. 657 00:55:38,820 --> 00:55:44,520 So once it collects in the for bay, it makes its way through the pond into the outlet structure. 658 00:55:45,220 --> 00:55:51,140 And then that outlet structure is directed to the third gravel wetland on the site. 659 00:55:52,200 --> 00:55:57,800 So, once we get to a gravel wetland, we have a four bay in each one of the three. 660 00:55:59,800 --> 00:56:02,820 Sean, there's an image further down, we can take a look at it too. 661 00:56:03,360 --> 00:56:10,220 So, starting on the left hand side, that would be an overflow from the four bay. 662 00:56:11,280 --> 00:56:14,520 They're not always built with a pipe. 663 00:56:14,520 --> 00:56:22,760 This is just an image taken from the New Hampshire Stormwater handbook, so your 664 00:56:22,760 --> 00:56:28,580 4-B would be off screen to the left. So it spills over from the 4-B. It goes into 665 00:56:28,580 --> 00:56:36,360 a bonding area, the first treatment cell for the gravel wetlands, and inside 666 00:56:36,360 --> 00:56:41,580 those gravel wetlands there would be some standpipes. You'd have a larger typical 667 00:56:41,580 --> 00:56:46,660 two foot, and then you'd have a series of eight inch diameter pipes that are 668 00:56:46,660 --> 00:56:52,760 perforated. It allows that stormwater to go into the gravel underneath a 669 00:56:52,760 --> 00:56:59,840 wetland layer that is vegetated. So this area, the gravel wetland area, excuse me, 670 00:56:59,980 --> 00:57:06,600 the gravel area underneath that substrate. That area is an anaerobic area, so it 671 00:57:06,600 --> 00:57:15,800 allows a breakdown of between oxygen to break down nitrogen and phosphorus, your two 672 00:57:15,800 --> 00:57:22,100 biggest concerns for your pollutants, to break them down to a level where the vegetation 673 00:57:22,100 --> 00:57:30,160 above them can actually pull them up those nutrients from their roots and provide nutrients 674 00:57:30,160 --> 00:57:32,040 for that growth, right? 675 00:57:34,020 --> 00:57:37,340 Your water, gravel wetlands is more of a horizontal motion 676 00:57:37,340 --> 00:57:40,740 for treatment, so it makes its way through that treatment cell, 677 00:57:41,480 --> 00:57:44,820 and then it goes into an under drain within the gravel, 678 00:57:45,160 --> 00:57:48,240 and it makes its way into a second treatment cell, 679 00:57:48,980 --> 00:57:53,480 where it gets more time for those nutrients to be absorbed. 680 00:57:54,580 --> 00:57:58,720 Eventually, it makes its way to the outlet control structure, 681 00:57:58,720 --> 00:58:04,960 where there's an under drain connected to it and then your lowest orifice, your smallest 682 00:58:04,960 --> 00:58:14,080 hole coming out of that structure before it outlets out of the pond, is located at 683 00:58:14,080 --> 00:58:23,740 that substrate area where the vegetation grows. So, your gravel layer is always saturated 684 00:58:23,740 --> 00:58:29,300 So, it's always promoting treatment of any water that's in there. 685 00:58:30,830 --> 00:58:36,580 So in your low flow storms, there are small ones where it's one inch or two year storm. 686 00:58:37,830 --> 00:58:40,940 You'd have flow out of the outlet control structure. 687 00:58:42,260 --> 00:58:48,760 And then in your larger storms, these ponds were sized to hold up to 100 year storm. 688 00:58:49,560 --> 00:58:54,880 So, you're talking about, I believe it's approximately eight inches of rain over 24-hour 689 00:58:54,880 --> 00:58:55,300 period. 690 00:58:55,840 --> 00:59:00,340 So, we're holding all that water in that pond and then the outlet structure is equipped 691 00:59:00,340 --> 00:59:06,400 with, you know, larger holes, orfaces in order to let some of that water out for the largest 692 00:59:06,400 --> 00:59:14,700 forms so that we have a full, you have a full drawdown with the exception of that gravel 693 00:59:14,700 --> 00:59:23,340 layer to allow the pond to drain within 72 hours. And that's per requirements of New Hampshire, 694 00:59:24,060 --> 00:59:28,780 Stormwater Manual. Any questions first before I continue? 695 00:59:31,710 --> 00:59:35,510 We're good. Okay. So I want to discuss 696 00:59:35,510 --> 00:59:38,190 why gravel wetlands are chosen on this site. 697 00:59:40,250 --> 00:59:44,750 As we know, UNH is very big in determining and studying 698 00:59:44,750 --> 00:59:48,830 and do an analysis of storm water throughout the state. 699 00:59:50,280 --> 00:59:56,610 The state of New Hampshire DES has worked with UNH to develop the most recent storm water 700 00:59:56,610 --> 00:59:58,490 a manual which came out last year 2025. 701 01:00:00,000 --> 01:00:11,140 And in that, they actually rated treatment options for stormwater, as well as updating kind 702 01:00:11,140 --> 01:00:18,020 of their regulations for alteration of terrain when you disturb more than 100,000 square feet, 703 01:00:18,240 --> 01:00:25,040 what your options are, depending on what your downstream receiving waters are. So as you 704 01:00:25,040 --> 01:00:28,380 There's no Oyster River is very important to you. 705 01:00:28,800 --> 01:00:36,800 It's classified as a Class A surface water, and in the regulations presented by the state, 706 01:00:36,940 --> 01:00:45,540 there's only two options for treatment on a site that drinks to a receiving water that's designated as a Class A. 707 01:00:45,780 --> 01:00:53,120 And Gravel Wetlands is one of them, a buyer retention with additional internal storage is the other. 708 01:00:53,120 --> 01:00:55,840 They both operate in a very similar manner. 709 01:00:56,400 --> 01:01:05,160 You have an area where you're allowing vegetation or a filter media to grab some of those 710 01:01:05,160 --> 01:01:09,480 nutrients and remove them from the water before discharging downstream. 711 01:01:11,100 --> 01:01:20,000 Actually where this regulation is pointed out in the AOT regulations is under discharged 712 01:01:20,000 --> 01:01:21,260 minimization requirements. 713 01:01:21,260 --> 01:01:29,680 It's not even listed in a separate section, like a treatment soil or an infiltration chamber 714 01:01:29,680 --> 01:01:30,420 system would be. 715 01:01:30,980 --> 01:01:37,720 It's actually listed for the record, 1507.03 is the section. 716 01:01:38,280 --> 01:01:49,100 And it's directly listed for phosphorus removal, for nitrogen removal, and for any stormwater 717 01:01:49,100 --> 01:01:52,440 within a quarter mile of a class A surface water, which we are. 718 01:01:53,560 --> 01:01:57,860 And gravel wetland is right at the top of the list for those, so that's why we chose 719 01:01:57,860 --> 01:01:58,460 that option. 720 01:01:58,660 --> 01:02:05,460 It's one of the best treatment options out there, especially on properties where you cannot 721 01:02:05,460 --> 01:02:07,300 promote infiltration like this one. 722 01:02:09,390 --> 01:02:10,290 We have any more questions. 723 01:02:11,510 --> 01:02:18,110 What happens when a gravel wetland becomes clogged with silt? 724 01:02:20,140 --> 01:02:26,690 So we put those upstream treatment trains in for a reason, right? 725 01:02:26,950 --> 01:02:37,770 So as long as you are taking care of your scheduled maintenance, so that's every spring and 726 01:02:37,770 --> 01:02:46,210 In every fall, there's requirements, and then within the first five years for gravel, wetland especially, there's additional, so it's a quarter a year, you're inspecting these. 727 01:02:46,810 --> 01:02:49,410 So as long as you're doing those things, you shouldn't have a problem. 728 01:02:50,630 --> 01:03:01,150 But in that case, the under drain, being connected to those perforated pipe stand pipes that allow, it would allow some opportunity to clean that out. 729 01:03:01,150 --> 01:03:06,830 But worst case scenario, you have to remove gravel and then replace the gravel. 730 01:03:07,510 --> 01:03:13,950 But there's been some studies done by UNH that show a great lifespan for gravel wetlands. 731 01:03:14,330 --> 01:03:20,730 You know, I think the last one that I just read was 20 years, and the pollutant removal 732 01:03:21,350 --> 01:03:26,330 loads were practically identical 20 years apart, so it's a very good option. 733 01:03:26,330 --> 01:03:36,950 And so much so that New Hampshire DOT almost all their projects now when they're doing renovations or needs to put in a new storm water treatment trains. 734 01:03:37,150 --> 01:03:38,790 They're including gravel wetlands. 735 01:03:39,950 --> 01:03:45,670 So there's a few I know right off of route four as you go up towards 16 in Dover. 736 01:03:46,230 --> 01:03:48,470 There's a few cells there. 737 01:03:48,470 --> 01:03:55,550 And there's some off of 93 when they did all the road work for the expansion of adding 738 01:03:55,550 --> 01:03:58,110 that lane on 93 in the Windamaria. 739 01:03:59,490 --> 01:04:04,830 So if you look around, they're all over the state, but it's a very vital option, especially 740 01:04:04,830 --> 01:04:10,210 when you're trying to remove pollutants like nitrogen, phosphorus, and even zinc. 741 01:04:11,230 --> 01:04:17,670 And when these catchabasins are cleaned out, where does the material letters were moved go? 742 01:04:17,670 --> 01:04:24,710 So they're vacuumed out, and then those companies that have that contract dispose of that material with 743 01:04:25,450 --> 01:04:30,350 in regards to how the state and federal requirements make them handle that. 744 01:04:30,670 --> 01:04:36,190 So whether it's a designated dump site, or if they have to do some treatment, 745 01:04:36,470 --> 01:04:39,350 it's whatever the federal regulations and state regulations require. 746 01:04:41,450 --> 01:04:42,810 And just a question. 747 01:04:42,810 --> 01:04:46,830 And you mentioned it's designed for 100 years event, 748 01:04:46,830 --> 01:04:48,990 which I think you said was like eight inches 749 01:04:48,990 --> 01:04:50,270 in a 24-hour period. 750 01:04:50,670 --> 01:04:51,350 Yeah, roughly. 751 01:04:51,790 --> 01:04:56,050 And so what I just know anecdotally, 752 01:04:56,110 --> 01:04:59,390 it seems like recently the storms, many storms 753 01:04:59,390 --> 01:05:01,050 that I see are more severe. 754 01:05:03,310 --> 01:05:05,470 And if we were to look forward, I guess, 755 01:05:05,770 --> 01:05:08,450 is that a realistic 100-year estimate looking forward? 756 01:05:08,710 --> 01:05:09,970 And then what happens in the event 757 01:05:09,970 --> 01:05:16,370 that you get ten inches in a 24-hour period, what does that mean to all of the capacity 758 01:05:16,370 --> 01:05:17,210 that you've played out? 759 01:05:17,950 --> 01:05:25,950 So in terms of a larger storm event first, it would depend on the insensity in timing. 760 01:05:26,610 --> 01:05:32,930 So we kind of look at eight inches, you can look at eight inches being dumped within 761 01:05:32,930 --> 01:05:37,670 And then two hours over, you know, say 20 inches and then four inches in the rest, right? 762 01:05:40,690 --> 01:05:46,930 But the ponds are equipped with an overflow grate, right? 763 01:05:47,030 --> 01:05:47,850 It's four by four. 764 01:05:48,710 --> 01:05:50,350 Every single pond is designed with that. 765 01:05:50,930 --> 01:05:57,790 And in our modeling, we're not utilizing that overflow as the orifice, right? 766 01:05:57,850 --> 01:06:02,190 We're trying to get all of the stormwater out through the holes in the side of the structure. 767 01:06:02,190 --> 01:06:19,930 So in the event of a larger storm, it would overflow via that rim first, and then if that doesn't meet the capacity, you would install a berm along that berm that pulls all that water, you have an emergency spillway. 768 01:06:20,610 --> 01:06:24,410 And that's just how majority of storm water ponds are constructed. 769 01:06:26,410 --> 01:06:29,530 So in a larger storm event, that would be utilized. 770 01:06:30,950 --> 01:06:46,190 We don't model anything more than a hundred year, because I know in recent times we have seen larger storm events, but we're still coming up from a time in the 80s and 90s where you were lucky if something was sized for a 25 year storm. 771 01:06:47,290 --> 01:06:56,670 So we're trying to mitigate storms up through the 100 year, but requirements even at the state level are only until the 50 year. 772 01:06:58,130 --> 01:07:11,850 And I'll tack on a little bit there, I'm sorry, you know, I spent a good part of my career when I was an engineer studying these things and understanding how where we're heading and what the, you know, what, how climate change adaptation is going to impact us. 773 01:07:13,390 --> 01:07:23,510 When it comes to calling something a 100 year storm, it's important to understand that, you know, it's a 1% chance of occurrence in a year. 774 01:07:23,510 --> 01:07:29,790 here based on measured rainfall that people have taken gauges for from NOAA, right, which 775 01:07:29,790 --> 01:07:32,730 ironically is doing a lot of work here in town out here. 776 01:07:33,490 --> 01:07:37,810 So it does change, right? 777 01:07:38,230 --> 01:07:40,050 We have to expect that it will change. 778 01:07:40,950 --> 01:07:47,190 The issue becomes where it almost becomes a question of economic viability. 779 01:07:47,190 --> 01:07:55,370 If we start requiring all our basins to deal with a point, the next stage, which is really 780 01:07:55,370 --> 01:08:00,530 a 500-year storm, what most of these people will model for us and show us what those 781 01:08:00,530 --> 01:08:07,330 rainfills will be, you end up with situations where it's almost non-vival. 782 01:08:08,090 --> 01:08:12,030 It's really difficult to build to that in terms of storm water management. 783 01:08:12,030 --> 01:08:28,570 And it's all overlaid with insurance and how all that stuff operates, but at the end of the day where the crossing of sustainability, which is not just environmentalism, we can talk about environmentalism all day. 784 01:08:29,350 --> 01:08:39,590 But the crossing of sustainability, which considers social environmentalism and economic viability, because we have to continue to meet our needs. 785 01:08:40,790 --> 01:08:43,190 currently exist at that 100-year store on this location. 786 01:08:43,790 --> 01:08:49,570 And so that's why as engineers, we continue to model to that number until such time 787 01:08:49,570 --> 01:08:50,170 as it would change. 788 01:08:50,430 --> 01:08:52,610 Because at the end of the day, I'm from Indiana. 789 01:08:53,050 --> 01:08:58,610 I'm not sure if anybody knows what happened in that state this year, but there were areas 790 01:08:58,610 --> 01:09:03,010 that got 16 inches of rain, you know, you can't deal with that. 791 01:09:03,690 --> 01:09:04,550 It's what it is. 792 01:09:04,550 --> 01:09:10,030 It's widespread studies to make sure that regions are okay, not individual sites. 793 01:09:14,240 --> 01:09:17,320 Could you address, so you talked about your spillways? 794 01:09:18,740 --> 01:09:26,540 If the spillways become active, do those follow the pattern down through your system or 795 01:09:26,540 --> 01:09:28,500 do they bypass the lower stages? 796 01:09:29,760 --> 01:09:36,640 It would be more of a bypass situation, so like for the top gravel wetland to the north, 797 01:09:37,340 --> 01:09:44,520 a bypass, excuse me, a spillway for that would spillway into the roadway and then it would 798 01:09:44,520 --> 01:09:47,240 just make its way down that existing drive. 799 01:09:50,100 --> 01:09:55,100 It's curbed to a certain point and then it would just run overland because it's not 800 01:09:55,100 --> 01:09:55,740 curved anymore. 801 01:09:56,140 --> 01:10:03,020 So it would make its way into that existing fire pond and it would follow the existing 802 01:10:03,020 --> 01:10:03,940 contours out there. 803 01:10:04,820 --> 01:10:06,680 So the existing slope out there. 804 01:10:06,680 --> 01:10:14,620 So your new systems, though, each of those spillways, down through your gravel wetlands, 805 01:10:15,340 --> 01:10:18,360 it looks like there's those spillways there. 806 01:10:19,400 --> 01:10:25,540 And maybe I'm misinterpreting the red in the corner there and how that all works. 807 01:10:26,920 --> 01:10:28,920 Well, yeah, I know there's still always there. 808 01:10:29,720 --> 01:10:36,800 So, does this fill away from the first treatment part of the gravel wetland into the second, 809 01:10:36,920 --> 01:10:38,700 go into the second or visit bypass? 810 01:10:39,140 --> 01:10:41,440 It looks like it just by the second stage. 811 01:10:41,720 --> 01:10:44,140 So you're, I know it's two cells. 812 01:10:45,220 --> 01:10:49,220 Those two cells are more for your treatment portion, right? 813 01:10:49,420 --> 01:10:52,920 So that's for your one-inch storm, your water quality volume. 814 01:10:52,920 --> 01:10:59,880 That's what the state has determined is 1 inch and then your two-year storm I'd have to check the numbers 815 01:10:59,880 --> 01:11:04,660 Maybe even your 10-year storm, but that would naturally make its way through those cells 816 01:11:05,460 --> 01:11:07,280 Through that train that I've discussed 817 01:11:07,960 --> 01:11:11,260 For your larger storms your 25 your 50 your 100-year 818 01:11:12,360 --> 01:11:18,740 You're automatically you're above those cell elevations and the high point of those cells that 819 01:11:20,340 --> 01:11:22,380 Disconnect them from each other and 820 01:11:22,380 --> 01:11:28,780 you're into another two to three foot layer additional storage and then if you 821 01:11:28,780 --> 01:11:32,280 had anything above that that's where your whole storm are you have one 822 01:11:32,280 --> 01:11:36,960 continuous burn around the outside and then that burn that separates the 823 01:11:36,960 --> 01:11:43,240 cells in the middle is a little bit lower so your spillway is on that outside burn 824 01:11:43,900 --> 01:11:49,080 and then so like I said for the top one it was a little bit dry so you fill both 825 01:11:49,080 --> 01:11:53,720 Well, before you hit this bill, yes, yes, thank you, absolutely. 826 01:11:54,320 --> 01:11:59,320 And I think one thing I'd like to highlight, when it comes to separating the concepts 827 01:11:59,320 --> 01:12:02,600 of water quality and water quantity, right? 828 01:12:03,080 --> 01:12:09,080 When we start talking 1% storms, even 25-year storms, we're talking about quantity management. 829 01:12:09,540 --> 01:12:16,000 We're preventing this site from discharging more water in those events than it would today. 830 01:12:16,000 --> 01:12:20,180 Okay, and that helps with downstream flood protection, right? 831 01:12:20,940 --> 01:12:26,460 When it comes to quality, the storm events that we're concerned with are actually much 832 01:12:26,460 --> 01:12:30,980 smaller, because we deal with what's called the first flush all the time, and I'm not sure 833 01:12:30,980 --> 01:12:31,960 if you've heard that concept. 834 01:12:32,800 --> 01:12:39,100 But that's typically the first inch of rainfall will typically be your quote unquote dirty rainfall. 835 01:12:39,620 --> 01:12:44,780 So these come with certain sizing mechanisms that Bridget's gone through and calculated 836 01:12:44,780 --> 01:12:50,140 to understand what that volume is to make sure that water gets treated to the level it needs 837 01:12:50,140 --> 01:12:50,880 to be treated to. 838 01:12:51,440 --> 01:12:57,000 And then anything above that is generally, quote unquote, clean water, much cleaner than 839 01:12:57,000 --> 01:12:59,600 that first flush because we've washed off everything that's sitting on the pavement. 840 01:13:00,300 --> 01:13:00,600 Right? 841 01:13:00,760 --> 01:13:02,600 So now you're just managing the quantity of the water. 842 01:13:08,630 --> 01:13:09,510 Any more questions? 843 01:13:10,850 --> 01:13:13,250 Do you have water shows on this? 844 01:13:14,290 --> 01:13:16,150 I think one thing I would like to discuss. 845 01:13:16,150 --> 01:13:23,350 Just, you know, we have a couple of conditional uses out there, but one waiver that kind of 846 01:13:23,350 --> 01:13:28,690 goes, you know, discussing with Michael a little bit by email today, maybe we want to discuss 847 01:13:28,690 --> 01:13:29,770 now are the slopes. 848 01:13:30,770 --> 01:13:32,370 We're asking for a waiver on the slopes. 849 01:13:33,970 --> 01:13:43,050 And the town requires three to one or less, so three horizontal, one vertical, something like 850 01:13:43,050 --> 01:13:43,310 that. 851 01:13:43,310 --> 01:13:49,630 We, in many other locations throughout New England, have gone to two to one slopes with slow protection. 852 01:13:49,850 --> 01:13:55,270 The reason we do three to one is not only from a maintenance perspective, but from a road abilities perspective. 853 01:13:56,070 --> 01:14:07,290 Once you put up an erosion protection on a two to one slope, the erosion concern typically goes away. 854 01:14:07,790 --> 01:14:11,930 Once you get it all stabilized, you can do that with erosion manning, which we're proposing. 855 01:14:13,310 --> 01:14:18,150 stone rip wrap which, you know, angular rip wrap locks things and there's a lot of different 856 01:14:18,150 --> 01:14:19,050 ways to accomplish that. 857 01:14:19,150 --> 01:14:24,050 Typically, you put them adding down, you let the seed grow and it's pretty stable, right? 858 01:14:24,570 --> 01:14:30,850 Unless you have a location where you're, you're discharging water fairly consistently which 859 01:14:30,850 --> 01:14:36,730 we're capturing all our water so only the water that lands and runs off will really be exposing 860 01:14:36,730 --> 01:14:38,010 us to erosion these locations. 861 01:14:38,010 --> 01:14:44,910 And even if there is a mild amount of erosion, it's captured by our grab allowance, right? 862 01:14:45,230 --> 01:14:50,710 So something that we'll be asking for as a part of the decision, I think we've adequately 863 01:14:50,710 --> 01:14:51,370 addressed it. 864 01:14:51,710 --> 01:14:54,010 But if there's any questions there, I'd like to discuss that too. 865 01:14:56,840 --> 01:14:59,640 Where are those two-to-one slopes in Asia? 866 01:15:00,000 --> 01:15:29,900 We can see them here, the contour lines where they're much tighter, right? These are two to one. You can see the difference to the three to one slope. So, these are, yeah. Yeah. So, you can see how they're just a little bit tighter. We have on the north side as well, another location of two to one slopes. We're finding through some investigation that a lot of this will likely be exposed ledge face though. So, the erosion concerns sort of go away. But we'll do some more investigations when we come back. 867 01:15:29,900 --> 01:15:35,860 again, we're looking at ways to modify the northern side to help us out with some of the 868 01:15:35,860 --> 01:15:42,320 work we're doing up here. Now that the ledges have been discovered, so other than that, 869 01:15:43,640 --> 01:15:47,460 along just where you see these sort of tighter contour lines, that's where you have the two 870 01:15:47,460 --> 01:15:47,840 to one slopes. 871 01:15:48,880 --> 01:15:53,760 And as soon as you get into the pond areas, we transition to a three to one, that's a state 872 01:15:53,760 --> 01:15:58,760 requirement. You can't have anything steeper than a three to one slope in design of your 873 01:15:58,760 --> 01:16:05,060 storm water ponds. So we have three to one in those locations. And to speak to what 874 01:16:05,060 --> 01:16:10,580 Sean was saying, the main purpose of the two to one slope and why we utilize that and 875 01:16:10,580 --> 01:16:16,760 ask for the waiver is to shrink our impact footprint. So we're not so much into the buffer 876 01:16:16,760 --> 01:16:25,320 and avoiding any disturbance to existing wetlands or that buffer area to the maximum extent possible 877 01:16:25,320 --> 01:16:25,960 all with this design. 878 01:16:26,960 --> 01:16:28,760 And thank you, that's a good point. 879 01:16:28,920 --> 01:16:30,620 So if we went to three to one right, 880 01:16:30,960 --> 01:16:33,680 we basically have to add a foot, 881 01:16:33,820 --> 01:16:35,240 every single one of these contours occur. 882 01:16:35,840 --> 01:16:38,800 So you have, there's about 15 feet max, 883 01:16:38,880 --> 01:16:40,700 so you're adding 15 more feet of disturbance 884 01:16:40,700 --> 01:16:43,780 into the wood, it's the wetland buffer, 885 01:16:43,980 --> 01:16:45,800 and it really, in a way, that's unnecessary, 886 01:16:46,220 --> 01:16:47,660 because we have ways to manage it. 887 01:16:48,120 --> 01:16:50,420 And similarly down here, although we're not right against 888 01:16:50,420 --> 01:16:52,560 a wetland buffer, if you push this out, 889 01:16:52,560 --> 01:16:57,200 Well the road gets pushed out, the pond gets pushed out, or the wetland gets pushed out. 890 01:16:57,340 --> 01:17:02,260 So we have the same consequence even though in essence it's not right against the edge. 891 01:17:02,520 --> 01:17:05,740 So this was, as Bridget said, a way for us to reduce our footprint a little bit. 892 01:17:07,340 --> 01:17:08,760 What's the landscaping plan? 893 01:17:09,100 --> 01:17:12,540 Oh, you said you're going to put down that and see long-term? 894 01:17:13,620 --> 01:17:17,640 Is that something you're going to have to bow at a two-to-one slope or is that going to 895 01:17:17,640 --> 01:17:22,240 to be some other stable, you know, vegetated surface. 896 01:17:22,400 --> 01:17:24,860 Yeah, typically, you know, two to one, I don't. 897 01:17:24,860 --> 01:17:27,420 Yeah, I mean, you know, our landscape, guys, 898 01:17:27,520 --> 01:17:29,360 have methods of taking care of that. 899 01:17:29,480 --> 01:17:32,200 A lot of times it will just let it grow in, right? 900 01:17:33,940 --> 01:17:35,740 And handle it a couple times a year. 901 01:17:36,720 --> 01:17:38,020 You know, there are native species 902 01:17:38,020 --> 01:17:39,860 that we can use on these slopes and things like that. 903 01:17:39,900 --> 01:17:41,920 Yeah, just worry about tires spinning on steep slopes 904 01:17:43,160 --> 01:17:47,140 and kind of get, you know, developing a stream, 905 01:17:47,640 --> 01:17:51,080 Yeah, I mean, we've personally, I've even done one-to-one slopes. 906 01:17:51,200 --> 01:17:54,740 I mean, typically, I armor those with rip rep because it is so hard to mo. 907 01:17:54,900 --> 01:17:57,980 But two-to-one, we've seen being able to manage, so. 908 01:17:59,060 --> 01:18:05,080 And can you just go through the technical advantage 909 01:18:05,080 --> 01:18:07,820 of having three-to-one versus two-to-one? 910 01:18:08,620 --> 01:18:16,020 If I understand that the town's requesting or likes to see a three-to-one, 911 01:18:16,960 --> 01:18:34,500 Is there a technical reason that a 3-to-1 is better than a 2-to-1, and then we're being asked for a waiver, so I just want to have some technical discussion on what is the disadvantage or disadvantage of that, so maybe you could just speak to why would we want a 3-to-1? 912 01:18:35,540 --> 01:18:44,620 I think the best analogy I've ever heard for this is you know you cook chicken to 165 right you cook chicken to 165 913 01:18:44,620 --> 01:18:50,740 if you look at the FDA guidance for it you can cook way less than that it's kind of wild but 914 01:18:52,040 --> 01:18:58,080 You cook chicken to 165 you only have to keep it there for three seconds and then you kill anything if you cook chicken to 915 01:18:58,080 --> 01:19:03,940 155 you keep it there for two minutes you're fine right and this matters to me because I like to smoke meat right 916 01:19:03,940 --> 01:19:08,340 I don't want to dry it out, but at the end of the day, it's kind of the same thing. 917 01:19:09,940 --> 01:19:13,980 Three to one is the default, safe way to go. 918 01:19:14,140 --> 01:19:15,060 You publish it for everybody. 919 01:19:15,360 --> 01:19:20,320 You try to follow that methodology where you can and where it makes sense because it prevents 920 01:19:20,320 --> 01:19:24,100 the erotability of the soil naturally when you start getting steeper than three to one. 921 01:19:24,140 --> 01:19:28,600 You start to see soil rot a lot more easily, right? 922 01:19:28,600 --> 01:19:32,040 That is the real technical reason for it. 923 01:19:32,920 --> 01:19:37,760 The maintenance, the mowing, the maintenance, definitely gets easier on a shallower slope. 924 01:19:38,400 --> 01:19:42,500 But you can go to two to one if you handle it appropriately and you do it the right way. 925 01:19:42,700 --> 01:19:46,200 It still operates just the same way as a three to one slope. 926 01:19:47,480 --> 01:19:53,680 So is this purely an erosion control or is it a pollutant control or some combination? 927 01:19:54,540 --> 01:20:00,440 Well, if you have erosion, you're basically taking sediment in water and throwing it down 928 01:20:00,440 --> 01:20:00,980 a hill, right? 929 01:20:01,240 --> 01:20:05,260 So, when we talk about sediment capture in our catch basins, that's what we're talking 930 01:20:05,260 --> 01:20:05,460 about. 931 01:20:05,480 --> 01:20:09,500 We're talking about grabbing the dirt that lives on the pavements, gets picked up by the 932 01:20:09,500 --> 01:20:11,460 water and flows downhill to our catch basins. 933 01:20:12,100 --> 01:20:14,020 So, it's the same thing, right? 934 01:20:16,340 --> 01:20:21,100 Erosion has water that picks up dirt and washes it away with itself, right? 935 01:20:21,100 --> 01:20:27,020 So the concern is a roadability, but that's why we put the erosion manning not to prevent that from happening. 936 01:20:27,940 --> 01:20:34,300 By putting the erosion manning down, you're basically making it operate as a three to one slope from an erotability standpoint. 937 01:20:35,460 --> 01:20:41,640 Most communities I see try to do the three to one, but you don't have to do those extra measures on a three to one. 938 01:20:42,560 --> 01:20:45,860 Right, so we're adding those extra measures to make it operate in the same fashion. 939 01:20:47,160 --> 01:20:52,100 And then on the top portion of that, you're requesting two to one as well. 940 01:20:53,660 --> 01:21:00,040 But there are no catch-based concerns on the other side of that two to one. 941 01:21:00,260 --> 01:21:04,600 On the south side, it looks like there are, but on that side, they're not. 942 01:21:06,320 --> 01:21:11,000 This is like a magic eye picture for me, actually, because you look at this and you think, 943 01:21:11,160 --> 01:21:12,040 oh, we're going downhill. 944 01:21:12,760 --> 01:21:12,960 You're not. 945 01:21:12,960 --> 01:21:16,300 This is sloping from the top to the bottom by this plan. 946 01:21:17,640 --> 01:21:20,220 And it's confusing because you would think it would go to the well end. 947 01:21:20,640 --> 01:21:25,220 But the natural course right now is we have a knob here that we're knocking down. 948 01:21:25,800 --> 01:21:30,100 And we're bringing this grade down to these grades we show here. 949 01:21:31,360 --> 01:21:35,380 It's about a 20 foot cut at its highest part. 950 01:21:35,700 --> 01:21:37,180 So we're bringing this all down. 951 01:21:37,540 --> 01:21:39,740 So on that it's actually sloping like this. 952 01:21:40,040 --> 01:21:40,220 Correct. 953 01:21:40,220 --> 01:21:45,100 towards the car is slipping this way into your catch basins. Correct. And this is 954 01:21:45,100 --> 01:21:49,300 looking at the two to top the bottom at the two to one. Yep. And and you actually 955 01:21:49,300 --> 01:21:54,980 end up with sort of a a ridge line here. This is hard to see. But you zoom in a 956 01:21:54,980 --> 01:21:58,860 little more essentially that green line that follows the contours. That's the 957 01:21:58,860 --> 01:22:03,940 ridge line. And you can see the contour levels right there, 958 01:22:03,940 --> 01:22:06,560 at 125, 130, 135, so you can see this. 959 01:22:07,000 --> 01:22:10,960 It's uphill coming into the down into the side. 960 01:22:10,960 --> 01:22:13,140 So it's great out there right now, it's like this. 961 01:22:13,480 --> 01:22:16,460 And then this is our proposed site, right? 962 01:22:16,800 --> 01:22:17,660 And we're down here. 963 01:22:17,960 --> 01:22:18,100 Right. 964 01:22:21,200 --> 01:22:25,060 Does the town have any thoughts on this? 965 01:22:25,340 --> 01:22:26,080 I mean, I, 966 01:22:30,490 --> 01:22:32,550 on board experts are absent tonight. 967 01:22:33,010 --> 01:22:34,610 So if you have caution, 968 01:22:35,270 --> 01:22:40,610 I would say, let's hold the discussion to another meeting with regards to that. 969 01:22:40,710 --> 01:22:45,590 Yeah, I think the one thing, the two-to-one slope put in an unstabilized system, 970 01:22:45,710 --> 01:22:50,970 that's right at angle, or very near angle of repose for sediment, where it will self-avalanche. 971 01:22:51,570 --> 01:22:56,470 So that's why the stabilization is really important, some kind of erosion 972 01:22:56,470 --> 01:23:03,890 matting to protect the rainfall from really just triggering those downslope, natural 973 01:23:03,890 --> 01:23:05,030 downslope a little bit. 974 01:23:05,870 --> 01:23:09,650 So that's why most towns look for something better than two to one. 975 01:23:09,950 --> 01:23:15,950 It's right at that sweet spot where sand will just have an inch down. 976 01:23:17,650 --> 01:23:19,830 How long does the erosion matting last? 977 01:23:21,990 --> 01:23:29,310 Depending on what you specify, but anywhere from 18 months to three years, it's biodegradable. 978 01:23:30,810 --> 01:23:33,550 So Green American North, I believe, is the company. 979 01:23:34,270 --> 01:23:37,830 And they have different levels that you can install. 980 01:23:39,290 --> 01:23:44,550 And it would be something typical we do at 18 to two month a year. 981 01:23:44,670 --> 01:23:46,810 And that's a two years, excuse me. 982 01:23:46,810 --> 01:23:50,750 And that's enough time to get the seed to germinate and really stabilize that slope 983 01:23:50,750 --> 01:23:53,250 before it disintegrates. 984 01:23:53,450 --> 01:23:55,210 Yeah, and that's the critical component, right? 985 01:23:55,310 --> 01:23:58,950 The emotional matting exists for the plants to tickle. 986 01:23:59,090 --> 01:24:00,830 Once the plants tickle, the roots hold everything. 987 01:24:01,950 --> 01:24:07,810 So it's a temporary need, and once it grows in, we're in good shape. 988 01:24:10,080 --> 01:24:12,960 It's not something you have to replace every, you know, 18 months or three years, 989 01:24:13,120 --> 01:24:13,640 in other words, right? 990 01:24:13,640 --> 01:24:14,460 But I 991 01:24:18,230 --> 01:24:25,610 think what we want to do though, I don't think we want to make a decision on this 992 01:24:25,610 --> 01:24:26,050 one tonight. 993 01:24:26,990 --> 01:24:28,830 We don't expect to vote by any means. 994 01:24:28,830 --> 01:24:31,750 This can all come when we're all prepared here. 995 01:24:31,910 --> 01:24:33,570 We don't even have a peer review back yet, right? 996 01:24:33,670 --> 01:24:35,030 I'm sure that'll speak to it as well. 997 01:24:35,110 --> 01:24:39,590 Those two particular people would be very upset if we... 998 01:24:39,590 --> 01:24:39,790 Yeah. 999 01:24:39,790 --> 01:24:48,090 And so with regards the two conditional uses we had one for activities in the wetlands 1000 01:24:49,630 --> 01:24:57,070 Actually, we have one or two, but and that one we're still waiting here back in the Conservation Commission on so 1001 01:24:57,770 --> 01:25:07,050 Unless all I want to do with this is if there's anything that folks think the Conservation Commission would not be looking at that they are interested in 1002 01:25:07,050 --> 01:25:08,950 and make it known now 1003 01:25:12,440 --> 01:25:14,980 for that in a wetland field. 1004 01:25:15,620 --> 01:25:18,120 Now the warehouse use, we can, 1005 01:25:20,160 --> 01:25:22,800 that is a conditional use. 1006 01:25:24,500 --> 01:25:25,700 Anybody hat, I mean, 1007 01:25:26,260 --> 01:25:30,420 do we, what are people's thoughts on the warehouse? 1008 01:25:31,560 --> 01:25:34,840 Julian, can we establish firmly that we're not talking 1009 01:25:34,840 --> 01:25:38,040 or they're not talking about the possibility 1010 01:25:40,540 --> 01:25:44,060 artificial intelligence, data center. 1011 01:25:47,260 --> 01:25:53,740 We were talking about putting in an exclusion. 1012 01:25:55,920 --> 01:26:00,200 Well, they have, where is it? 1013 01:26:01,200 --> 01:26:02,800 No, that's not it. 1014 01:26:03,600 --> 01:26:09,940 There was a water usage limitation that if they go over, 1015 01:26:09,940 --> 01:26:13,100 or they need to come back to us, right? 1016 01:26:15,350 --> 01:26:19,490 Well, they go to a committee and they make a recommendation 1017 01:26:19,490 --> 01:26:23,410 to the town council, so that will, 1018 01:26:23,790 --> 01:26:25,650 if the council hasn't addressed that, 1019 01:26:25,910 --> 01:26:27,690 that will be a precedent condition. 1020 01:26:30,650 --> 01:26:32,250 I'm not sure I got an answer. 1021 01:26:32,890 --> 01:26:33,670 Well, the, 1022 01:26:37,040 --> 01:26:45,070 it is, when it comes to an AI data center use 1023 01:26:45,070 --> 01:26:47,570 that you're talking about, you don't know. 1024 01:26:48,330 --> 01:26:50,810 They're not set, they're not, they're, yeah. 1025 01:26:50,910 --> 01:26:51,430 Those are heat. 1026 01:26:51,950 --> 01:26:54,290 They're, these buildings are not set up 1027 01:26:54,290 --> 01:26:59,130 for really, they're not structurally, 1028 01:26:59,430 --> 01:27:03,850 because that's, to do that, the cooling systems, 1029 01:27:03,890 --> 01:27:06,150 you need and everything else, you require 1030 01:27:06,150 --> 01:27:07,170 a different type of building. 1031 01:27:08,330 --> 01:27:15,050 But, and with, and my comment about, 1032 01:27:15,070 --> 01:27:24,650 the site plan review regarding water usage is that they'll be if they exit. There's a certain 1033 01:27:26,370 --> 01:27:31,410 you think when we were talking about a use like that you're thinking about what's the impact right 1034 01:27:31,410 --> 01:27:35,430 yes yeah and so what impacts are you concerned about? 1035 01:27:38,960 --> 01:27:42,120 The many possible but this would be a small 1036 01:27:42,120 --> 01:27:53,500 I admit this would be a small possibility for a date of center, but this is a bigger 1037 01:27:53,500 --> 01:27:55,400 issue than tonight. 1038 01:27:57,040 --> 01:28:09,940 I'm asking this partly in connection with Michael's response to Mr. Calderwood who asked whether 1039 01:28:09,940 --> 01:28:17,280 that it was possible or impossible to have a data center at the technology to have sight. 1040 01:28:18,140 --> 01:28:24,240 Right, so I think it would be useful for the board to get some clarification on this. 1041 01:28:26,540 --> 01:28:31,820 Whether, and I think there's different kinds of data centers, there's different scales of data centers. 1042 01:28:32,580 --> 01:28:39,200 But I think it would be, and I'm not sure whether any of those would be allowed under our current zoning. 1043 01:28:39,660 --> 01:28:47,780 As I had mentioned, the three sort of uses that might encompass our office, light manufacturing, and warehouse. 1044 01:28:48,680 --> 01:28:53,060 And I don't think office would, light manufacturing might arguably. 1045 01:28:54,060 --> 01:28:58,360 So, but I do think it would be useful for the board, whether tonight or another time, 1046 01:28:59,060 --> 01:29:07,120 to be clear about what a data center is, the different kinds of data centers, 1047 01:29:07,900 --> 01:29:10,120 and if it would be appropriate or not. 1048 01:29:10,660 --> 01:29:17,320 And I think you may want to have a condition on an approval that would prohibit them. 1049 01:29:18,460 --> 01:29:24,240 We'd have to have a good reason, and we'd want to have a discussion with the applicant. 1050 01:29:24,800 --> 01:29:31,160 But I suspect that the kind of data centers we're thinking of would not be appropriate. 1051 01:29:31,400 --> 01:29:33,620 The applicant probably would not entertain that. 1052 01:29:33,940 --> 01:29:37,680 And I suspect that we could come up with some language that would work. 1053 01:29:38,000 --> 01:29:38,440 I disagree. 1054 01:29:39,220 --> 01:29:41,880 I don't think we could come up with some language that would work. 1055 01:29:43,220 --> 01:29:49,020 Because it's a way too complicated, it's a very, very complicated issue. 1056 01:29:49,640 --> 01:29:59,560 It's best handled as from the viewpoint of not treating it as a data center, but treating it as a 1057 01:30:00,000 --> 01:30:29,000 They use, because if we're going to say you can't do a great data center, then we'd also want to say you can't do a greenhouse. Because a greenhouse, which I believe is allowed in that zone, would have potentially just as much water usage and electrical usage as a moderate data center. Which is why my point of it's the impacts you want to look at and restrict, not the use. 1058 01:30:29,000 --> 01:30:36,780 It would probably be intelligent for this board to become more educated on data centers. 1059 01:30:36,940 --> 01:30:39,280 But I think that is completely separate from this. 1060 01:30:40,960 --> 01:30:44,360 I think there's a lot of fear about data centers. 1061 01:30:44,920 --> 01:30:49,620 But when you look at this site, you're not even investing in anything that would, 1062 01:30:49,960 --> 01:30:56,120 what you're investing in, wouldn't be needed by the data center. 1063 01:30:56,980 --> 01:31:01,160 And you're not set up for it and to really make money data so these things are huge. 1064 01:31:01,520 --> 01:31:02,580 These things are huge. 1065 01:31:03,300 --> 01:31:06,720 And so that site is really not set up for that anyway. 1066 01:31:06,900 --> 01:31:13,020 So I don't think it's going to help us if we add a fear of something we're not really 1067 01:31:13,020 --> 01:31:13,660 educated in. 1068 01:31:13,760 --> 01:31:16,300 So I think when it comes to data centers, it's very hot right now. 1069 01:31:16,640 --> 01:31:20,440 It would probably do this for a lot of good if we could have some kind of presentation. 1070 01:31:20,740 --> 01:31:24,960 We could do some research to understand what it is and what the true impacts are. 1071 01:31:24,960 --> 01:31:28,200 So that we can create in zoning allowed or not. 1072 01:31:28,340 --> 01:31:32,260 I was going to bring this up next week, okay, 1073 01:31:32,500 --> 01:31:35,540 because it doesn't belong to an applicant's. 1074 01:31:35,540 --> 01:31:36,320 You're right, I agree. 1075 01:31:36,660 --> 01:31:37,240 A discussion. 1076 01:31:37,340 --> 01:31:37,580 I agree. 1077 01:31:37,960 --> 01:31:41,620 But the New Hampshire Association of Regional Planning 1078 01:31:41,620 --> 01:31:45,500 Commission has put together their first draft 1079 01:31:46,120 --> 01:31:51,580 of what plan boards need to do regarding data centers. 1080 01:31:51,580 --> 01:31:58,980 It's in the process of getting signed off, but I'm hoping I could have it in our hands by next meeting. 1081 01:31:59,360 --> 01:31:59,860 That would be great. 1082 01:32:00,320 --> 01:32:00,540 Okay. 1083 01:32:01,020 --> 01:32:03,120 But I don't really think it's anything to do with this particular. 1084 01:32:03,700 --> 01:32:04,720 Thank you, Mr. Chairman. 1085 01:32:05,180 --> 01:32:12,580 And that said, I hope other members of the board will read the white paper you said last week. 1086 01:32:15,700 --> 01:32:25,400 and you should all have it. It's worth reading. It is very one sided. So let's move on. 1087 01:32:25,600 --> 01:32:29,520 And it will be the first of many because there's another eight. 1088 01:32:29,960 --> 01:32:32,820 There'll be part of next week. The next thing. 1089 01:32:32,940 --> 01:32:39,760 Oh, we're about to have the open the public hearing and then continue it till the next time. 1090 01:32:39,760 --> 01:32:49,960 time. We public hearing is already open for this. Has it been open? Well, didn't we have it at it's continued. It's continued. I mean, 1091 01:32:49,980 --> 01:32:57,540 if anybody wants to speak, I'll open the public hearing. Yes, I will open the public hearing. Is there anyone who would like to speak regarding 1092 01:32:57,540 --> 01:33:02,860 this specific specific issue? Do we have anybody on Zoom? 1093 01:33:04,940 --> 01:33:09,600 No hands up. No hands up? All right. What I was hoping to do is, though, is to talk 1094 01:33:09,600 --> 01:33:21,320 We talk about building height and the warehouse uses, conditional uses to see if we have any besides the idea that is it a warehouse or could it be a data center? 1095 01:33:21,840 --> 01:33:25,200 Are there other issues around the warehouse use? 1096 01:33:26,300 --> 01:33:31,960 I mean, I'm really not sure why we restrict warehouse use. 1097 01:33:31,960 --> 01:33:42,940 I think the reason that in some of those zones that light manufacturing office use is allowed by 1098 01:33:42,940 --> 01:33:50,860 right, whereas warehouse is a conditional use, probably the general, the town would prefer 1099 01:33:51,740 --> 01:33:56,800 light manufacturing, high technology, R&D, office use, to warehouse use. 1100 01:33:56,800 --> 01:34:01,860 It employs fewer people, probably has less value, may generate more truck traffic. 1101 01:34:02,580 --> 01:34:07,180 So there probably is a general preference, for-line manufacturing, 1102 01:34:07,540 --> 01:34:08,420 over-ware house. 1103 01:34:09,060 --> 01:34:10,800 We'll see how this plays out. 1104 01:34:11,080 --> 01:34:13,560 It's probably going to be a mix. 1105 01:34:14,860 --> 01:34:17,200 But I think that's the reason it's a condition to use. 1106 01:34:19,670 --> 01:34:20,630 My question. 1107 01:34:21,510 --> 01:34:26,810 Yes, so on the use question, the only thing that's sort of haunting me from the 1108 01:34:26,810 --> 01:34:31,170 presentation we had previously with regard to the travel, which I know we have a consultant 1109 01:34:31,170 --> 01:34:35,890 that's going to give us a report and review all that, relates, though, to the issue in 1110 01:34:35,890 --> 01:34:41,670 terms of what the use is that the use code, I think, was 10 that they, well, it was one 1111 01:34:41,670 --> 01:34:48,870 10 that the traffic engineer picked. So she said that the time that was the maximum, but 1112 01:34:48,870 --> 01:34:53,710 the question is sort of still in my mind. I asked this question at the site walk, is whether 1113 01:34:53,710 --> 01:34:59,170 and it might wind up in what I would call a retail distribution level as opposed to a 1114 01:34:59,170 --> 01:34:59,550 wholesale. 1115 01:34:59,790 --> 01:35:04,010 And my verb user, no one else, is if it's tractor trailer, tractor trailer, that's 1116 01:35:04,010 --> 01:35:07,190 one thing this limited number, tractor trailer is going to come and go because they're so big. 1117 01:35:07,770 --> 01:35:12,410 If it's tractor trailer coming in and small vans going out to deliver, it can be a whole lot 1118 01:35:12,410 --> 01:35:16,170 more vans than you would have if it was just all tractor trailers in and out. 1119 01:35:16,830 --> 01:35:18,790 And that's questions still in my mind. 1120 01:35:18,790 --> 01:35:24,710 And in terms of how it, the variant would have on the actual traffic counts and what that might mean for that. 1121 01:35:25,030 --> 01:35:26,590 Which I realize is going to be addressed in the future. 1122 01:35:26,770 --> 01:35:31,810 But I'm just related to the use, that was a question I just want to put on the record right now as a concern. 1123 01:35:32,310 --> 01:35:36,190 Okay, and I second that as well. 1124 01:35:36,670 --> 01:35:41,370 Only because no matter where that traffic goes, it's all going to go down technology drive. 1125 01:35:41,730 --> 01:35:45,310 And you do have 600 students living right there on technology drive. 1126 01:35:45,310 --> 01:35:56,130 And when I look at that road and I imagine traffic going all day back and forth there, I think pedestrians could be better served in terms of some access. 1127 01:35:56,370 --> 01:36:00,130 And it may not be all day, it may be a burst in the morning and then a burst in the afternoon. 1128 01:36:00,290 --> 01:36:00,810 Right, possible. 1129 01:36:00,910 --> 01:36:02,010 Either way, a lot of trucks. 1130 01:36:02,290 --> 01:36:07,950 I know I'm not presupposing anything, but I know Amazon's delivering things at my house at 4 o'clock in the morning. 1131 01:36:07,950 --> 01:36:14,670 And so there's a lot of activity depending on what goes in there. 1132 01:36:14,810 --> 01:36:14,890 Yeah. 1133 01:36:15,810 --> 01:36:16,230 All right. 1134 01:36:17,510 --> 01:36:18,790 What about building height? 1135 01:36:21,500 --> 01:36:23,840 Are there any issues with building height? 1136 01:36:24,480 --> 01:36:27,400 Is building going to be higher than any of the trees around there? 1137 01:36:28,980 --> 01:36:30,480 50 feet probably. 1138 01:36:31,440 --> 01:36:31,820 No. 1139 01:36:32,340 --> 01:36:33,600 I don't think anybody's going to see it. 1140 01:36:34,260 --> 01:36:35,780 It's hard to see that site. 1141 01:36:36,420 --> 01:36:37,480 Unless you're in it. 1142 01:36:38,580 --> 01:36:42,340 And you had to remember there's a significant cut for those buildings too, so yeah. 1143 01:36:45,840 --> 01:36:52,480 Because we're shorthanded and we require five yays for ignition use, I don't recommend 1144 01:36:52,480 --> 01:36:54,120 we go for an action on the floor. 1145 01:36:54,120 --> 01:36:54,680 No, that's you. 1146 01:36:55,100 --> 01:36:56,600 Yeah, I'm going to take action. 1147 01:36:57,300 --> 01:37:00,180 For unconditionally, this is what I have seven voting members. 1148 01:37:00,180 --> 01:37:12,700 So with regards to that, to reiterate, we're waiting on a conservation commission regarding 1149 01:37:12,700 --> 01:37:19,920 the two wetland related ones, there's some concerns about, and I believe the term that 1150 01:37:19,920 --> 01:37:25,100 was used by a traffic study person was Amazon style warehouse. 1151 01:37:28,440 --> 01:37:32,100 And the building height looks to be not an issue. 1152 01:37:34,200 --> 01:37:44,360 I will say, you know, I'm happy to provide our knowledge to this board regarding data centers at what point that you choose to explore that item. 1153 01:37:45,960 --> 01:37:54,920 With respect to last mile distribution or all the different types of facilities that Amazon uses, we've had experience developing Amazon facilities before. 1154 01:37:54,920 --> 01:37:59,120 or they're extremely particular about how they operate. 1155 01:37:59,640 --> 01:38:06,700 And there would be immense changes to this site in order to accommodate anything that they would want to do in particular. 1156 01:38:06,900 --> 01:38:09,340 And I know I'm citing them specifically. 1157 01:38:10,000 --> 01:38:16,260 There are also, you know, we got to talk about how this board would qualify FedEx or 1158 01:38:16,260 --> 01:38:24,180 DHL or those types of delivery companies as well, because essentially they do operate in a similar fashion. 1159 01:38:24,180 --> 01:38:27,800 and they're not sending out fleets of vans, right? 1160 01:38:28,560 --> 01:38:31,520 But they do have, you know, you can picture a UPS truck 1161 01:38:31,520 --> 01:38:32,740 leaving a facility. 1162 01:38:33,100 --> 01:38:36,460 So I will have our traffic engineers speak to that. 1163 01:38:36,780 --> 01:38:39,920 When we come back and we return to have the traffic conversation, 1164 01:38:40,680 --> 01:38:43,140 I do know that light industrial is very close 1165 01:38:43,140 --> 01:38:46,420 and mimics those for my understanding, 1166 01:38:46,600 --> 01:38:47,780 but I don't want to misspeak. 1167 01:38:47,780 --> 01:38:58,660 So I think when it comes to data centers the only one, the one thing I'll say we have no intention of doing that here at this time. 1168 01:38:58,900 --> 01:39:11,200 However, it's, you know, time has a way of changing things and it could be a very long time away from, from when we even own this building or I'm even alive at this site could be repurposed. 1169 01:39:11,200 --> 01:39:12,620 So I fully understand the question. 1170 01:39:13,240 --> 01:39:15,260 It's something I do suggest the board get in front of, 1171 01:39:15,400 --> 01:39:19,340 but the good news is these facilities require a lot of water 1172 01:39:20,440 --> 01:39:22,880 and not only does this board have to weigh in, 1173 01:39:22,960 --> 01:39:24,740 but the city council will have to weigh in on that as well. 1174 01:39:25,360 --> 01:39:27,380 So the town retains a ton of control 1175 01:39:27,380 --> 01:39:29,100 when it comes to that sort of thing. 1176 01:39:29,800 --> 01:39:32,560 For Mr. Chair, I believe you mentioned something 1177 01:39:32,560 --> 01:39:35,240 about restricting the water here. 1178 01:39:35,480 --> 01:39:37,040 So if that becomes a condition, 1179 01:39:37,340 --> 01:39:38,780 there's a lot of certainty for this board 1180 01:39:38,780 --> 01:39:43,000 in the public about what can go here without further conversation. 1181 01:39:43,320 --> 01:39:44,000 All right. 1182 01:39:45,770 --> 01:39:46,610 Thank you. 1183 01:39:48,570 --> 01:39:51,610 Was there anything else that we were going to cover? 1184 01:39:51,770 --> 01:39:53,630 Well, you have the wetland scientists here. 1185 01:39:54,350 --> 01:40:03,230 And your, the conditional use for the WCOD includes both your purview over filling of the 1186 01:40:03,230 --> 01:40:09,870 wetlands, which is there's some proposal there, as well as activity within the wetland 1187 01:40:09,870 --> 01:40:17,090 buffer. So I know the you've spoken before but it's probably a good time to ask you 1188 01:40:17,090 --> 01:40:22,690 know for you to explain a little more and respond any questions. Mr. Chair is that 1189 01:40:22,690 --> 01:40:28,950 does that make sense? I if there are any particular questions I mean we've been 1190 01:40:28,950 --> 01:40:33,810 shown the two fingers believe it was two fingers that we're going to get filled in. 1191 01:40:40,500 --> 01:40:48,740 Yeah, my plan, if I was asked to do so, would be to first ask. 1192 01:40:48,900 --> 01:40:56,780 If there was any questions from the site walk, as been noted, we still have concluded our 1193 01:40:57,200 --> 01:41:01,220 work with the Conservation Commission next Tuesday, I believe. 1194 01:41:03,900 --> 01:41:10,560 where I think we may be get a little bit more detailed with some of the things that came up during the site walk. 1195 01:41:14,160 --> 01:41:24,480 Generally we saw almost all the impact areas, I don't believe we walked up to the tiny little triangle on the northern edge of the site. 1196 01:41:27,300 --> 01:41:37,080 But generally, I hope it was clear as my intention to demonstrate that these areas where impacts 1197 01:41:37,080 --> 01:41:45,320 are posed while wetlands are certainly important in the context of water quality given the proximity 1198 01:41:45,320 --> 01:41:56,620 either oyster river, we're not in fact significant in a lot of other, for a lot of other 1199 01:41:56,620 --> 01:42:03,680 function. And the importance of that would be some of what's discussed here with respect 1200 01:42:03,680 --> 01:42:14,500 to stormwater controls. And the level and quality of what's being proposed will mitigate 1201 01:42:14,500 --> 01:42:23,180 any small potential effects from impacts to these fingers and edges that are well-upgradient 1202 01:42:23,180 --> 01:42:32,960 from the core of wetland where it's wetter and which are likely performing the bulk 1203 01:42:32,960 --> 01:42:33,780 of that function. 1204 01:42:36,320 --> 01:42:38,780 That really is the key point. 1205 01:42:38,780 --> 01:42:53,000 I mean, there was some other discussion regarding the possibility that the well into the north would be de-watered somehow by that cut. 1206 01:42:55,600 --> 01:43:03,240 We had probably planned a more detailed conversation with the Conservation Commission, I think that's probably appropriate. 1207 01:43:03,240 --> 01:43:33,140 But I understand the concern, but the soils, the nature of the soils here is demonstrated by the soil survey, the site specific soil survey that was done for the project indicates that the soils in this area are such that the water table in that wetland is perched. 1208 01:43:34,340 --> 01:43:40,180 and that below that is very, very low permeability for those soils. 1209 01:43:40,180 --> 01:43:48,600 They are just poorly drained, dense mineral soils, so that is really just a run-off area, 1210 01:43:48,600 --> 01:43:58,560 and it's really not connected to groundwater in a way that would pose a risk of having to be do water 1211 01:43:58,560 --> 01:44:00,680 by cutting into that slope. 1212 01:44:01,200 --> 01:44:05,540 So in addition, there's a burn on top, which would prevent it from actually spilling over. 1213 01:44:07,260 --> 01:44:16,980 So that's sort of the gist of, you know, that concerns what really wanted only concerns 1214 01:44:16,980 --> 01:44:18,540 that was voiced at the site walk. 1215 01:44:18,760 --> 01:44:25,320 So again, I guess I'd ask if there was any specific questions I could answer, and I will likely 1216 01:44:25,320 --> 01:44:28,800 be back to ask again. 1217 01:44:28,800 --> 01:44:28,920 Yeah. 1218 01:44:31,690 --> 01:44:59,970 Peter. I ran into the yellow jackets before I made it down into that we were headed for. And boarded at that point, is there any, so I didn't see this for myself. Is there any indication that there's a femoral, you know, intermittent flow into any of those fingers, spring, runoff kind of thing, or is it all just, you know, forced to wet them? So is it all based on soils? Are there any indication of freedom? 1219 01:45:02,240 --> 01:45:29,980 You mean as far as like a rural pool? No, you know, these are all, all these fingers are upslope from what the wetland is. And I was just wondering if there is any indication that the topography was controlling any small, channelized flow that isn't showing up on your white art data. Is this, is this a question about stream presence? Yeah. Yeah. You know, if, you know, 1220 01:45:29,980 --> 01:45:37,440 If, well, spring, very ephemeral runoff kind of streams that are feeding down through there. 1221 01:45:37,920 --> 01:45:40,380 Yeah, I think, but, you know, and you can probably speak to this. 1222 01:45:40,480 --> 01:45:42,220 And this may be a con-com question. 1223 01:45:42,500 --> 01:45:46,440 Yeah, well, it's your question, too, so we're happy to answer it. 1224 01:45:46,520 --> 01:45:52,280 But, you know, when it comes to perennial intermittent stream measurements and all those things, 1225 01:45:52,420 --> 01:45:56,680 I mean, an intermittent stream usually exists, what, in sort of a spring time season 1226 01:45:56,680 --> 01:46:01,920 and where it flows pretty consistently during those seasons, right? 1227 01:46:02,520 --> 01:46:06,200 When it typically rains a little bit more, water isn't going to the ground as much 1228 01:46:06,200 --> 01:46:10,580 because it's still falling out, things like that, these are more water happens 1229 01:46:10,580 --> 01:46:15,840 to just use this path of flow to get to where it needs to go, those wetland systems. 1230 01:46:16,080 --> 01:46:21,260 And it's not anything that I've seen in, 1231 01:46:24,660 --> 01:46:26,580 I don't know, 1232 01:46:26,580 --> 01:46:32,340 Yeah, there's water is flown down through wheat litter and so the only the only place where 1233 01:46:34,360 --> 01:46:35,600 So when we 1234 01:46:36,700 --> 01:46:41,180 It's sometimes not that helpful to talk well perennial streams maybe stand out 1235 01:46:42,620 --> 01:46:43,980 The obvious 1236 01:46:44,960 --> 01:46:46,640 differences that they exist 1237 01:46:47,460 --> 01:46:48,360 all the time 1238 01:46:50,060 --> 01:46:52,540 Other streams intermittent ephemeral 1239 01:46:53,500 --> 01:46:55,240 You know those are basically 1240 01:46:56,440 --> 01:47:04,120 different ways of describing something that has a flowed enough on the surface to create 1241 01:47:04,120 --> 01:47:13,500 a channel, which could, usually specifically excludes the concept of Rosen, like we were 1242 01:47:13,500 --> 01:47:18,040 talking about earlier, but essentially that's the same thing. 1243 01:47:19,720 --> 01:47:26,340 The large finger in the southwest corner, there's no channel there. 1244 01:47:28,320 --> 01:47:37,360 I was, we were down there trying to explain that I probably went up about as high as you 1245 01:47:37,360 --> 01:47:41,140 could bring that as far as soil as a vegetation. 1246 01:47:42,340 --> 01:47:55,180 The science of hydrology there would be very slight indications of surface saturation 1247 01:47:56,860 --> 01:47:59,940 probably during the limited spring season. 1248 01:48:01,720 --> 01:48:07,580 The other areas are there's no room for a stream really to exist in any of those areas. 1249 01:48:07,580 --> 01:48:17,880 is that that impact is essentially caused or that triangle which is constitutes the impact 1250 01:48:17,880 --> 01:48:27,180 area was essentially created by a couple of large trees which are blown down and taken 1251 01:48:27,180 --> 01:48:33,960 a lot of soil with them there by lowering the grade enough where that area is now wet. 1252 01:48:33,960 --> 01:48:43,300 But there is, yeah, in this area, which is the small, isolated area is by definition 1253 01:48:43,300 --> 01:48:45,200 of no flowing or out of that area. 1254 01:48:47,120 --> 01:48:56,960 There is a channel not anywhere near to our impact in that northern wetland, but it does 1255 01:48:56,960 --> 01:49:06,560 As it gets down on the steeper portion of that hill as it approaches the Oyster River 1256 01:49:06,560 --> 01:49:12,220 wetlands, that does, you know, create a channel in that area. 1257 01:49:12,620 --> 01:49:14,560 That's an inner mainstream impact there. 1258 01:49:16,060 --> 01:49:19,780 And of course, we're well, well away from that. 1259 01:49:26,110 --> 01:49:26,950 Any other questions? 1260 01:49:35,880 --> 01:49:36,060 Okay. 1261 01:49:41,760 --> 01:49:46,340 I just like to commend the applicant for the presentation on the stormwater. 1262 01:49:46,420 --> 01:49:48,300 I thought that was very coherently presented. 1263 01:49:48,520 --> 01:49:48,860 Thank you. 1264 01:49:49,520 --> 01:49:49,680 Yeah. 1265 01:49:49,900 --> 01:49:50,240 Thank you. 1266 01:49:50,900 --> 01:49:51,580 Totally agree. 1267 01:49:51,720 --> 01:49:52,860 That was excellent. 1268 01:49:53,160 --> 01:49:53,760 Thank you very much. 1269 01:49:54,960 --> 01:50:00,820 So, Mr. Chair, just I think it'd be helpful to talk a little bit about scheduling. 1270 01:50:00,820 --> 01:50:22,460 The, this is on the agenda for the conservation commission next Tuesday, but the commission has a very busy agenda, and I'm, they'll probably only have 20 minutes or so, so I think it's very unlikely they're going to make their recommendation for the conditional use, but hopefully that will happen at the October 26th meeting. 1271 01:50:23,380 --> 01:50:41,840 So the planning board's upcoming meetings are in two weeks on October 14th, October 28th and then you have one meeting in November and one meeting in December and I'm retiring November 30th, but if this is not completed before I go, 1272 01:50:43,420 --> 01:50:50,900 I will have a draft notice for the board and my successor so you'll be able to finalize details. 1273 01:50:54,640 --> 01:51:01,880 So, I'm not seeing any real significant obstacles, but there's a lot of small things. 1274 01:51:02,500 --> 01:51:09,340 And my sense is that it's probably useful to continue to the 14th, go over miscellaneous 1275 01:51:09,340 --> 01:51:17,540 issues, and then depending on the timing of the stormwater consultant and the traffic consultant, 1276 01:51:17,540 --> 01:51:19,780 and then you might be ready for final action, 1277 01:51:20,360 --> 01:51:24,900 maybe November, if not, hopefully December. 1278 01:51:28,100 --> 01:51:30,540 I'm hoping that we can start taking action 1279 01:51:30,540 --> 01:51:33,300 on some of the conditional uses by October 28th. 1280 01:51:37,900 --> 01:51:41,320 If we get all of them, you know, so you said, 1281 01:51:41,480 --> 01:51:44,440 so we have miscellaneous stuff and then traffic 1282 01:51:44,440 --> 01:51:46,060 and stormwater. 1283 01:51:48,800 --> 01:51:57,760 I think that's it, third-party reviews and after that we should be able to be 1284 01:51:57,760 --> 01:52:05,020 coming to a decision and if we're only waiting, I would say, let the 1285 01:52:05,020 --> 01:52:07,980 Council, the Vation Commission know that we really need their response on 1286 01:52:07,980 --> 01:52:11,640 October 20th. Oh, I think they know that, yeah, because 1287 01:52:13,660 --> 01:52:14,940 I'm not sure I'm going to 1288 01:52:14,940 --> 01:52:16,060 want a week form after that? 1289 01:52:16,060 --> 01:52:17,940 No, no, I think they understand that. 1290 01:52:18,380 --> 01:52:18,520 All right. 1291 01:52:20,820 --> 01:52:27,240 So do you want to continue to the, because recognizing there's 1292 01:52:27,240 --> 01:52:31,680 four more meetings for the rest of 2026, is it useful to 1293 01:52:31,680 --> 01:52:33,200 continue to the 14th? 1294 01:52:33,260 --> 01:52:36,160 I'd like to continue to the 14th just to keep them, you know, 1295 01:52:36,480 --> 01:52:40,200 we can tie up everything that we're not waiting on somebody 1296 01:52:40,200 --> 01:52:40,700 else for. 1297 01:52:41,340 --> 01:52:42,020 All right? 1298 01:52:42,120 --> 01:52:42,400 Sounds good. 1299 01:52:42,500 --> 01:52:43,720 That's the general idea. 1300 01:52:43,720 --> 01:52:52,580 a tile all that up so that as people come in and finish the reviews, we're ready to take them on immediately. 1301 01:52:53,460 --> 01:52:54,760 I think that makes sense. 1302 01:52:55,840 --> 01:52:56,760 Does that work for you? 1303 01:52:57,500 --> 01:53:00,960 Yeah, I was going to suggest that it's always better to be on the agenda than off, right? 1304 01:53:01,180 --> 01:53:03,480 If we fall off, then you guys just have a shorter meeting. 1305 01:53:04,660 --> 01:53:13,240 I do know we're also chasing down the exact process of presenting our water usage to town council as well. 1306 01:53:13,240 --> 01:53:15,980 Also, we'll be working towards that. 1307 01:53:16,100 --> 01:53:17,700 Hopefully we'll have some resolution on that. 1308 01:53:17,780 --> 01:53:19,520 I'm not sure of the timing on that yet, 1309 01:53:19,640 --> 01:53:23,000 but Keish Nordstrom and Bridget and Matt 1310 01:53:23,000 --> 01:53:25,420 will be reaching out to set that up. 1311 01:53:26,700 --> 01:53:30,740 But I believe Rich Rine also wanted to review 1312 01:53:30,740 --> 01:53:34,000 the water against their townwide model. 1313 01:53:34,260 --> 01:53:36,380 So that's another thing that's in play here 1314 01:53:36,380 --> 01:53:38,120 that we need to lock up. 1315 01:53:38,260 --> 01:53:40,080 But I don't know Michael if you've heard back from him 1316 01:53:40,080 --> 01:53:41,740 on that question, we just talked about it today. 1317 01:53:41,740 --> 01:53:48,500 So yeah, I mean that was one of the things that board asked that we looked at so we'll have to check with rich 1318 01:53:48,940 --> 01:53:49,960 Okay, that all is 1319 01:53:51,420 --> 01:53:53,420 At the end of technology drive 1320 01:53:54,100 --> 01:53:59,200 There was worked on a couple years ago, and was that for a new water pumping? 1321 01:54:00,560 --> 01:54:00,960 station 1322 01:54:02,780 --> 01:54:07,940 Or or you know, or was it sewer? It was either water or sewer and I'm just trying to I 1323 01:54:07,940 --> 01:54:12,360 I believe it was water, but Rich will be able to tell you that. 1324 01:54:12,820 --> 01:54:18,600 I know that because we have that fairly new main by, you know, water standards that 1325 01:54:18,600 --> 01:54:23,380 comes down through our property by easement, so it would make sense that, oh, there's 1326 01:54:23,380 --> 01:54:23,940 Rich right there. 1327 01:54:25,040 --> 01:54:25,840 Great timing. 1328 01:54:26,300 --> 01:54:26,880 Can you help, Rich? 1329 01:54:27,500 --> 01:54:30,560 Yeah, that was unrelated to this project. 1330 01:54:30,560 --> 01:54:37,600 That was the technology drive water pump station, and that had to do with the additional 1331 01:54:37,600 --> 01:54:44,540 capacity and the extension that we had to the lead circle for the MTBE funding that we received 1332 01:54:44,540 --> 01:54:51,420 from the DEES. But we are working with Underwood Engineers. We have a third-party consultant doing 1333 01:54:51,420 --> 01:54:57,100 the review of the Water Demand. We need to get some more information from Sean and his team to be 1334 01:54:57,100 --> 01:55:02,640 able to complete that. But it's moving along. And just real quick on the stormwater piece, 1335 01:55:02,640 --> 01:55:20,440 We believe we'll probably have draft comments from our third party reviewer at the end of next week, and we're expecting final review letter by the 5th of October, barring any unusual circumstances that we see in the stormward review. 1336 01:55:20,740 --> 01:55:26,680 And based on what we've seen so far, there probably will not be traffic engineering review. 1337 01:55:26,680 --> 01:55:31,580 the impact study that that's in the process of we're developing a scope in 1338 01:55:31,580 --> 01:55:37,000 fee proposal right now with Apex and and it will be presenting that to to 1339 01:55:37,000 --> 01:55:40,400 Sean and his team probably over the next year and probably early part middle 1340 01:55:40,400 --> 01:55:45,500 part of next week. All right so if that review comes back by the fifth we might 1341 01:55:45,500 --> 01:55:59,430 be able to have that on the night of 14th as well. Yeah all right you're right 1342 01:55:59,430 --> 01:56:06,130 So there will be certainly a fair amount more traffic on technology drive, including truck traffic. 1343 01:56:06,930 --> 01:56:23,970 Are there any concerns for use of technology drive by the 600 or so students at the cottages of their safety of any kind of improvements that might be needed along there for pedestrians and bicyclists? 1344 01:56:23,970 --> 01:56:29,430 Well, I'm more concerned about the parking that's on there being a problem to the pedestrians 1345 01:56:29,430 --> 01:56:30,730 and cyclists. 1346 01:56:31,050 --> 01:56:42,530 It's the combination of everything there is an issue, but I think the problems right now, 1347 01:56:43,210 --> 01:56:48,850 there is no, effectively there is no bike lane, there is no, there is kind of a walking lane 1348 01:56:48,850 --> 01:56:50,530 between the parked cars and the curb. 1349 01:56:55,000 --> 01:56:56,780 So Rich, are you still there? 1350 01:56:57,880 --> 01:57:01,920 I am, I was just going to say, as part of any project of this nature, 1351 01:57:01,920 --> 01:57:05,200 just like the Riverswood Project as I'm going right now, 1352 01:57:05,500 --> 01:57:10,320 we will have a robust traffic management plan as part of this, 1353 01:57:10,400 --> 01:57:14,040 and we'll ensure that there's safety for pedestrian cyclists, 1354 01:57:14,240 --> 01:57:19,140 other vehicles on the roadway, and we'll be working with the GC 1355 01:57:19,140 --> 01:57:22,140 and any of their folks during that whole process. 1356 01:57:22,480 --> 01:57:25,900 So I don't anticipate that as being a major hurdle to get over, 1357 01:57:26,220 --> 01:57:29,720 but we'll have to talk with the team, the RJ Kelly team, 1358 01:57:29,860 --> 01:57:31,040 to make sure that happens. 1359 01:57:31,820 --> 01:57:34,420 Well, I'm wondering not during a construction, 1360 01:57:34,620 --> 01:57:41,340 but permanently if there's any concern about a conflict there 1361 01:57:42,120 --> 01:57:46,400 with pedestrians and bicyclists on a technology drive, 1362 01:57:46,400 --> 01:57:49,100 What kind of space there is for them to use? 1363 01:57:50,820 --> 01:57:55,100 Yeah, I think that will all come out during the traffic impact study. 1364 01:57:55,260 --> 01:57:58,120 Third-party review, we'll have comments on that. 1365 01:57:58,920 --> 01:57:59,460 Thank you. 1366 01:58:00,780 --> 01:58:01,000 Question? 1367 01:58:01,860 --> 01:58:02,020 Mike. 1368 01:58:03,860 --> 01:58:12,400 Rich, in the traffic review from APEX, is it a normal thing or is it something that's within 1369 01:58:12,400 --> 01:58:17,920 the scope to actually look at the destiny and traffic along 121 tech drive as it exists 1370 01:58:17,920 --> 01:58:24,400 currently. Oh yeah they would do a pre-construction and post-construction review of that so that 1371 01:58:24,400 --> 01:58:31,400 wouldn't be an unusual occurrence and that's what we intend on scoping you know within that third 1372 01:58:31,400 --> 01:58:36,960 part of review. So there would be an idea in terms of actual body count going up and down tech drive 1373 01:58:36,960 --> 01:58:43,420 now. It's going to be, you know, we don't have, you know, a pedestrian counter out there to 1374 01:58:43,420 --> 01:58:49,500 determine exactly what we, what we have for numbers, but there will be trip generation numbers 1375 01:58:49,500 --> 01:58:54,440 likely that there'll be a loophole. I don't imagine it will be from ITE, but it'll be for some, 1376 01:58:54,440 --> 01:58:59,940 some source to understand what we have. I know there's a bus stop there that's used quite frequently, 1377 01:59:00,300 --> 01:59:05,180 so we'll have to take all that into account during our scope development with, with APEX. 1378 01:59:06,960 --> 01:59:13,000 Because to the issue of the pedestrian safety, it would seem like having some sort of empirical data might be helpful. 1379 01:59:13,480 --> 01:59:16,520 I don't believe we have any pedestrian data for that road. 1380 01:59:16,960 --> 01:59:23,420 No, but I don't think it takes a whole lot to get pedestrian data, either, for a few days worth of counts. 1381 01:59:24,660 --> 01:59:25,940 It's not a high tech. 1382 01:59:26,720 --> 01:59:32,600 One, the only difficulty I would see with that is that when I'm looking at that, there's no sidewalk there. 1383 01:59:32,600 --> 01:59:37,360 there's no managed way for pedestrians to get up and down that currently. 1384 01:59:38,220 --> 01:59:42,260 So even in the best case right now, I would say it's dangerous. 1385 01:59:42,680 --> 01:59:47,020 And as more traffic is there, it becomes more challenging, 1386 01:59:47,020 --> 01:59:54,560 I think, for pedestrians to navigate that in the small bike lane sort of walking area 1387 01:59:54,560 --> 01:59:58,300 that's there, not including the addition of the current park cars. 1388 02:00:00,000 --> 02:00:05,460 It's a very wide shoulder there. You're right. And you know, and that's something that we'll take into account during the review. 1389 02:00:09,540 --> 02:00:33,020 And just to that point, like, typically in the traffic studies, I, I don't see mention of the pedestrians. I see a lot of vehicular analysis, but I don't typically see what's it look like for pedestrians navigating that same space. That's why I asked why not that could be something as part of it, because if you're concerned about. And I don't, maybe there's really no pedestrians walking up and down the 1390 02:00:33,020 --> 02:00:36,360 street. Maybe they come out and they go to their cars or something. That's it. I don't know. I'm not 1391 02:00:36,360 --> 02:00:41,560 sure that anybody knows it. It's very few. Where's the bus stop? Is it? That's not technical. It's 1392 02:00:41,560 --> 02:00:48,080 internal to the cottages. Right. No, it's down by the bus station. All right. The bus stop, there's 1393 02:00:48,080 --> 02:00:54,940 there are two three three internal to the cottages. Then there's one as you're leaving 1394 02:00:56,800 --> 02:01:02,980 tech drive just before you get to Main Street and the one that inbound that 1395 02:01:02,980 --> 02:01:07,180 matches that has floated up and down the hill a little bit but it used to last 1396 02:01:07,180 --> 02:01:11,120 year was at the top of the hill of tech drive as you're coming up and it 1397 02:01:11,120 --> 02:01:16,660 bubbles off but I don't that would be that one's a mess now and then they would 1398 02:01:16,660 --> 02:01:21,860 and you drop people off there who are trying to go to rear-view apartments back 1399 02:01:21,860 --> 02:01:27,660 on Main Street so they'd be walking down the hill to get back and now at this 1400 02:01:27,660 --> 02:01:32,060 point in time there's not even in the current conditions there's not no space 1401 02:01:32,060 --> 02:01:36,940 there for them to get off the bus walk down to Main Street because of the park 1402 02:01:36,940 --> 02:01:40,100 cars because of the park car yeah all 1403 02:01:45,540 --> 02:01:50,760 right so I you know when they were 1404 02:01:50,760 --> 02:01:55,380 talking about adding parking spaces on tech drive I didn't realize they're how 1405 02:01:55,380 --> 02:02:01,740 far down the hill, they were going to go with them, or I would have said something. 1406 02:02:04,980 --> 02:02:07,920 All right, but thank you. 1407 02:02:08,440 --> 02:02:08,920 Thank you. 1408 02:02:09,340 --> 02:02:11,160 We'll see you on the 14th. 1409 02:02:24,610 --> 02:02:31,730 And item 10 is the Capital Improvement Program, review of proposed 2027 and 2036 CIP with Todd 1410 02:02:31,730 --> 02:02:35,870 Selig, the town administrator and Gail Jablonsky, the business manager. 1411 02:02:59,880 --> 02:03:00,660 Good evening. 1412 02:03:01,180 --> 02:03:02,080 Great to see you all. 1413 02:03:02,360 --> 02:03:02,900 Good evening. 1414 02:03:04,040 --> 02:03:09,060 So, I am Todd Zellig, the administrator here in Durham, and I am accompanied in person 1415 02:03:09,060 --> 02:03:15,540 by Dave Ramanuel, and then virtually by Rich Reign and Guelder Blonski, who hopefully 1416 02:03:15,540 --> 02:03:18,980 Gwyneth can bring up on the screen in some way. 1417 02:03:20,560 --> 02:03:21,380 Okay, great, thank you. 1418 02:03:23,180 --> 02:03:26,600 So we are here tonight to talk about the Capital Improvements Program. 1419 02:03:27,260 --> 02:03:28,260 You all have a copy. 1420 02:03:30,280 --> 02:03:36,060 First, the capital improvements program is a big document, here's the hard copy version 1421 02:03:36,060 --> 02:03:38,760 of it here for the viewing public who might be interested. 1422 02:03:39,460 --> 02:03:44,940 We have a copy here at the business office and of course you have a copy of your packets. 1423 02:03:45,940 --> 02:03:51,460 These represent items submitted by departments, boards, committees and commissions for consideration 1424 02:03:51,460 --> 02:04:01,060 as part of the FY 2027 budget, if it's an item proposed for 27, or as part of our long-range plan. 1425 02:04:02,220 --> 02:04:13,140 Our town charter requires a look ahead of six years for capital projects, but we go one step beyond that and look out 10 years to get a better sense of our collective capital future. 1426 02:04:13,140 --> 02:04:20,100 The CIP includes items that have a value of $10,000 or more and a lifespan generally of 1427 02:04:20,100 --> 02:04:21,700 five or more years. 1428 02:04:22,620 --> 02:04:24,500 I want to note that this is a draft. 1429 02:04:24,880 --> 02:04:30,640 This is what Gail and I have received unedited from the departments and I'm in the process 1430 02:04:30,640 --> 02:04:34,360 with Gail of meeting with the departments to talk about all of these proposals. 1431 02:04:35,180 --> 02:04:42,420 And as part of the annual budget process, we'll be betting them and changing the order 1432 02:04:42,420 --> 02:04:50,400 as needed as part of the formal budget presentation, which will go to the council for the last four November 1433 02:04:50,400 --> 02:04:56,320 1st, and it will be presented to the council at the council meeting on November 2nd. 1434 02:04:57,860 --> 02:05:03,600 Let me just see, just want to lead you through some of the highlights here. 1435 02:05:04,660 --> 02:05:12,240 The first is if you look sort of at the first page, you'll see that Gail has very ingeniously 1436 02:05:12,240 --> 02:05:16,680 The line, the spreadsheet, and on the far left side, you'll see a page number. 1437 02:05:16,960 --> 02:05:21,060 So I'm looking under the fire department right now on page 19. 1438 02:05:21,740 --> 02:05:29,800 There's an item to replace the F, the 2007 Ford F354 Street truck for $300,000. 1439 02:05:30,260 --> 02:05:37,760 And just as an example, if you were to look at page 19, you'll see the specific sheet, 1440 02:05:37,760 --> 02:05:43,540 the Fire Department created, which provides a justification for the project, the description 1441 02:05:43,540 --> 02:05:49,000 of the project, the cost of the project, the purchase price of the project, in this case, 1442 02:05:49,220 --> 02:05:55,220 the request is for $300,000. There's next a financing section, which talks about how 1443 02:05:55,220 --> 02:06:00,880 that specific item would be funded. And in this particular case, the proposal from the 1444 02:06:00,880 --> 02:06:06,820 Fire Department is to bond the item and to share the cost of the bond $50, $50 with you 1445 02:06:06,820 --> 02:06:13,120 So specifically, during we cover $150,000, you and H recover $150,000. 1446 02:06:13,620 --> 02:06:17,740 And so on, that's how the project, the program is put together. 1447 02:06:18,740 --> 02:06:25,540 I try to give some thought each year about specific CIP items that you as a planning board 1448 02:06:25,540 --> 02:06:28,940 might be interested in, although we could talk about any and all of them if you want. 1449 02:06:29,540 --> 02:06:35,520 But the first that I think is particularly relevant is on page 30, replace in the 2015 1450 02:06:35,520 --> 02:06:44,260 Farrara Aerial Ladder Truck for $2.2 million in year 2028. 1451 02:06:45,400 --> 02:06:50,460 And that is a project again, if you look on page 30, that would be shared 50-50 with 1452 02:06:50,460 --> 02:06:56,380 UNH based on our municipal services agreement we have with UNH. 1453 02:06:56,900 --> 02:07:00,600 So the cost for each would be $1,100,000. 1454 02:07:01,600 --> 02:07:08,360 I thought maybe Dave Emanuel could just speak briefly to how a fire truck is valuable, 1455 02:07:08,880 --> 02:07:14,360 a ladder truck in particular for Durham, because on one hand it's necessary for you and 1456 02:07:14,360 --> 02:07:21,360 each to reach their top buildings, but in essence it is used more in fires for Durham 1457 02:07:21,360 --> 02:07:24,640 off campus buildings than it is on campus. 1458 02:07:25,120 --> 02:07:27,320 So could you just speak to that? 1459 02:07:31,060 --> 02:07:31,700 Thank you, Todd. 1460 02:07:31,700 --> 02:07:38,400 Dave Emmanuel, I serve as your fire chief, and our aerial apparatus, 1461 02:07:39,060 --> 02:07:46,040 when we look at how frequently we use it, it's over the past three years, 1462 02:07:46,420 --> 02:07:49,880 it goes around 60 times a year, it goes out to different buildings. 1463 02:07:50,480 --> 02:07:55,300 And because of the nature of the university's buildings, 1464 02:07:55,780 --> 02:07:58,260 we have 10 story buildings or up to 10 story buildings. 1465 02:07:58,600 --> 02:08:00,300 They're fully alarmed, they're fully sprinkled. 1466 02:08:00,300 --> 02:08:04,940 We generally aren't using a lot of truck on those buildings. 1467 02:08:04,940 --> 02:08:12,700 We're usually using one of residential structures that burn wood and have chimneys that we need to get to the roof for to work on a chimney fire. 1468 02:08:13,260 --> 02:08:17,280 So there's a need for this apparatus for both the town and the university. 1469 02:08:17,800 --> 02:08:19,160 I answer your question appropriately. 1470 02:08:19,520 --> 02:08:29,880 It does, and I think for the planning board perspective, sometimes I've observed the board getting questions about a project that is tall and residents will ask well. 1471 02:08:29,880 --> 02:08:33,700 Do we have the equipment to access that and this ladder truck is 1472 02:08:33,700 --> 02:08:36,480 the top of our 10 store buildings on campus, right? 1473 02:08:36,640 --> 02:08:42,620 Yes, so building less than 10 storeys, if we can place it appropriately, we should be good. 1474 02:08:43,440 --> 02:08:52,620 And so two of five storey building height in downtown, let's say, it would be able to reach the top of that building or whatever access you would need. 1475 02:08:53,160 --> 02:08:54,780 If it was say five storeys. 1476 02:08:55,080 --> 02:08:57,360 Yes, that's exactly right. 1477 02:08:58,160 --> 02:09:05,140 So, again, I'm going to fly and any time jump in or we can backtrack. 1478 02:09:05,360 --> 02:09:11,420 So, next I was going to jump ahead to page 58, which is, yes, yes. 1479 02:09:11,660 --> 02:09:13,420 All right, a new fire station. 1480 02:09:13,760 --> 02:09:14,420 Great, okay. 1481 02:09:15,780 --> 02:09:18,440 That's being budgeted now in 29. 1482 02:09:19,660 --> 02:09:24,900 Yes, the proposal from the fire department was to include it in fiscal year 2029. 1483 02:09:24,900 --> 02:09:28,640 Does that mean we have a site that we think it's going to go at? 1484 02:09:29,160 --> 02:09:35,740 So in the budget discussion with the fire department, which included UNH representatives, 1485 02:09:36,140 --> 02:09:39,260 we had a lengthy conversation around this proposal. 1486 02:09:39,840 --> 02:09:42,720 And the fire department is anxious to move ahead the project. 1487 02:09:43,380 --> 02:09:50,440 At the same time, in terms of our budgetary conversation, on the town side, I recognize Durham 1488 02:09:50,440 --> 02:09:55,600 has some significant fiscal constraints, and we're not really in a position to bring 1489 02:09:55,600 --> 02:10:01,620 on an additional $10 million in debt at this near-term period of time, nor is UNH. 1490 02:10:01,780 --> 02:10:03,260 The UNH people expressed to us. 1491 02:10:03,840 --> 02:10:10,260 So our consensus was that we should push this project out to about 2,031 at the earliest, 1492 02:10:10,860 --> 02:10:14,820 and the location we're targeting now is B-Lod. 1493 02:10:19,780 --> 02:10:20,420 Yes. 1494 02:10:20,420 --> 02:10:25,400 For the last ten years, we had been targeting waterworks road. 1495 02:10:25,800 --> 02:10:33,540 There was a pad there that was reserved for joint fire department, UNH Police Department, 1496 02:10:33,920 --> 02:10:35,520 EMS structure. 1497 02:10:36,260 --> 02:10:41,460 But we believe BILA is actually a better location. 1498 02:10:41,700 --> 02:10:45,900 We've always felt it was a better location and it appears to be open for conversation 1499 02:10:45,900 --> 02:10:46,740 at this time. 1500 02:10:46,740 --> 02:10:50,780 And UNH has outlined that as a potential site in its master plan. 1501 02:10:51,340 --> 02:10:58,600 So for planning purposes, I would likely propose moving this out to 2031 at the earliest. 1502 02:10:59,860 --> 02:11:01,660 Subject to further conversation. 1503 02:11:01,900 --> 02:11:05,040 And the next logical question is, is 20 million really the number? 1504 02:11:05,380 --> 02:11:11,980 And I can say that 20 million was the number like 15 years ago for that large facility. 1505 02:11:11,980 --> 02:11:18,440 We know that our initial thoughts of combining UNH police and Durham fire did not in practice 1506 02:11:18,440 --> 02:11:25,920 result in many economies of scale because particularly the police operation desires to 1507 02:11:25,920 --> 02:11:32,000 have everything cordoned off from fire, which did not really allow us to jointly use locker 1508 02:11:32,000 --> 02:11:36,020 rooms, shower rooms, conference rooms, things like that. 1509 02:11:36,020 --> 02:11:46,480 So we're really not seeing a benefit per se of a joint facility like that, but we also know the cost of fire departments have gone up quite a lot. 1510 02:11:46,740 --> 02:11:54,000 So $20 million is probably a good, very general planning number, but it is not a specific proposal right now. 1511 02:11:54,380 --> 02:12:02,720 And to the extent we can eliminate big pieces of equipment or consolidate a fewer bays we need, 1512 02:12:02,720 --> 02:12:06,860 which means the less expensive the project becomes. 1513 02:12:07,480 --> 02:12:08,740 So reducing our square footage. 1514 02:12:09,000 --> 02:12:12,400 Right. So one concept we talked a little bit about 1515 02:12:12,400 --> 02:12:15,100 during the budget discussion for this item was whether 1516 02:12:15,100 --> 02:12:20,040 it might be possible to combine two pieces of equipment 1517 02:12:20,040 --> 02:12:22,960 and to move away from a standalone aerial ladder 1518 02:12:22,960 --> 02:12:25,020 to what's called a quint. 1519 02:12:25,740 --> 02:12:26,120 Is that right? 1520 02:12:26,360 --> 02:12:26,960 That is correct. 1521 02:12:27,180 --> 02:12:31,740 Which is a multiple use vehicle that has a ladder 1522 02:12:31,740 --> 02:12:39,920 function as well. But I will note that we've been very disappointed in this 2015 vehicle. 1523 02:12:40,420 --> 02:12:49,360 It has been out of service for about a quarter of the time since we've had it. And typically 1524 02:12:49,360 --> 02:12:54,280 we like to keep these pieces of equipment for about 20 years. And as you'll note, this 1525 02:12:54,280 --> 02:12:56,260 is replacing it like in 12 years. 1526 02:12:56,640 --> 02:13:00,900 So we're having conversations around. 1527 02:13:05,550 --> 02:13:05,710 Good. 1528 02:13:06,030 --> 02:13:14,290 So page 58, vehicle replacement at the police department. 1529 02:13:14,650 --> 02:13:16,550 I won't get into this in any depth, 1530 02:13:16,690 --> 02:13:22,590 but basically we had set a goal about five or six years ago 1531 02:13:22,590 --> 02:13:31,010 So, to transition our 100% gasoline-powered fleet to a hybrid fleet at the police department, 1532 02:13:31,130 --> 02:13:37,330 and with the most recent vehicle, we've just completed that transition, which is positive 1533 02:13:37,330 --> 02:13:37,670 news. 1534 02:13:37,970 --> 02:13:43,170 So, now, all of the frontline vehicles that the police are driving are hybrid, and they've 1535 02:13:43,170 --> 02:13:48,770 had great luck in terms of maintenance and fuel economies and fuel savings with that hybrid 1536 02:13:48,770 --> 02:13:49,630 technology. 1537 02:13:49,630 --> 02:13:57,970 So that's positive news and we have a program where those police vehicles move from frontline 1538 02:13:57,970 --> 02:14:06,230 marked vehicles to command slash detective vehicles that are unmarked to eventually they're 1539 02:14:06,230 --> 02:14:11,330 downshifted to this lot that a public works and are used for the assessing vehicle or the 1540 02:14:11,330 --> 02:14:16,290 code enforcement vehicle or the vehicle the public works director drives around in and we try 1541 02:14:16,290 --> 02:14:18,150 to get the most out of those vehicles. 1542 02:14:18,450 --> 02:14:20,090 And typically when we're done with them, 1543 02:14:20,450 --> 02:14:23,070 they work like $250 and they go to a junkyard 1544 02:14:23,070 --> 02:14:27,650 because we've just used them as long as we can. 1545 02:14:28,650 --> 02:14:31,890 So this typically would be a year 1546 02:14:31,890 --> 02:14:35,150 where we would replace two vehicles rather than one, 1547 02:14:35,650 --> 02:14:37,250 but for cost savings reasons 1548 02:14:37,890 --> 02:14:41,550 and because we've had good performance from the hybrids, 1549 02:14:42,090 --> 02:14:44,290 the police department is comfortable recommending 1550 02:14:44,290 --> 02:14:49,850 just one vehicle for the 2027 which is positive. 1551 02:14:52,010 --> 02:14:54,790 Let me see moving ahead. Page 60 1552 02:14:54,790 --> 02:14:59,970 following is the courthouse old town hall renovation that's targeted for 1553 02:15:00,000 --> 02:15:29,980 Number 2,030, and Rich Reign, if you are there in Cyberland, if you could please come up. As you know, we've just completed renovations at the Bickford Chessley Farmhouse at Wagon Hill Farm. That was one, so the first historic building on our list of renovations, repairs, refurbishment that was needed to maintain that building. The courthouse is next. And we had the same individual do a very preliminary review. 1554 02:15:29,980 --> 02:15:33,760 Did you have both big for Chesley and the courthouse about 10 years ago? 1555 02:15:34,380 --> 02:15:39,040 That was Aaron Sturgis and so Rich could you maybe just touch me on the plans for the courthouse? 1556 02:15:39,500 --> 02:15:47,320 Sure Todd, thank you so we're not asking for any funding in 2027 for the courthouse. 1557 02:15:47,520 --> 02:15:52,380 We do have some funding in place from previous years as Todd had mentioned. 1558 02:15:53,140 --> 02:15:59,640 Aaron Sturgis did a review and evaluation structurally as well as other components 1559 02:15:59,640 --> 02:16:06,400 to determine what would be needed for the BIC for Chesley House as well as the old courthouse. 1560 02:16:06,760 --> 02:16:12,500 I would call that kind of a 25,000-foot view of that assessment. 1561 02:16:13,000 --> 02:16:17,140 We then really got down into the details on the BIC for Chesley House, 1562 02:16:17,380 --> 02:16:22,840 and we're able to design the project that we just recently completed. 1563 02:16:23,480 --> 02:16:27,840 We haven't done that on the courthouse over the next year or so. 1564 02:16:27,840 --> 02:16:33,900 So we plan on getting into that and trying to get a better understanding of what the cost 1565 02:16:33,900 --> 02:16:38,740 would be today to maintain and rehabilitate that building. 1566 02:16:39,160 --> 02:16:45,020 Another important question of before we do that is what will be the long term use of 1567 02:16:45,020 --> 02:16:45,640 that building. 1568 02:16:46,060 --> 02:16:53,220 So we're in the process of trying to get an understanding of what components would be 1569 02:16:53,220 --> 02:17:00,540 necessarily be replaced, but long term uses is a question. We've done a fair amount of work on 1570 02:17:00,540 --> 02:17:07,600 that building over the last couple of years. We replaced the second floor HVAC system. We converted 1571 02:17:07,600 --> 02:17:16,660 the oil-fired boiler for the first floor to natural gas. We replaced the flooring in the multi-purpose 1572 02:17:16,660 --> 02:17:19,900 this room with a historically accurate oak flooring. 1573 02:17:20,140 --> 02:17:22,460 We did some work on some of the doors 1574 02:17:22,980 --> 02:17:26,460 and in our operational budget that we'll be presenting, 1575 02:17:26,820 --> 02:17:29,860 we do have some requests for continued work 1576 02:17:29,860 --> 02:17:32,440 on some of the other components, the ADA door. 1577 02:17:33,060 --> 02:17:34,880 We did some mortar work previously. 1578 02:17:35,340 --> 02:17:38,920 So this year, in 27, we're not requesting any funding. 1579 02:17:39,380 --> 02:17:42,080 We've pushed out a request to 2030. 1580 02:17:42,940 --> 02:17:44,860 That might be pushed out even further 1581 02:17:44,860 --> 02:17:49,280 as we evaluate the building and determine what the long-term use would be. 1582 02:17:50,160 --> 02:17:55,340 And I'll just note the Sturgis report had outlined some structural issues at the higher 1583 02:17:55,340 --> 02:18:00,740 parts of the building and we've had an engineer evaluated, he's determined that the volume is 1584 02:18:00,740 --> 02:18:07,160 building is safe, but as part of the HVAC work, we've also removed some very heavy HVAC ductwork 1585 02:18:07,160 --> 02:18:11,980 that was hanging on the beams and that weight was not intended and it was having an impact on the 1586 02:18:11,980 --> 02:18:17,560 building. So that that contributing problem has been eliminated, which is good news. 1587 02:18:19,160 --> 02:18:24,840 Next is page 67 the purchase of solar panels at the Packers Falls gravel pit. 1588 02:18:26,000 --> 02:18:32,900 This is an example of where we tried to use a town-owned asset. In this case, in the town of Leigh, 1589 02:18:32,900 --> 02:18:40,260 our Packers Falls gravel pit where we installed a 650 KW solar ray with revision energy that was 1590 02:18:40,260 --> 02:18:50,120 and also IGS solar. It's owned by IGS and Durham has a set rate for electricity that 1591 02:18:50,120 --> 02:18:55,980 we purchased from IGS, which is competitive, and we have the opportunity over a 20-year 1592 02:18:55,980 --> 02:19:02,460 period of time to purchase that array at a depreciated cost. The original idea was to 1593 02:19:02,460 --> 02:19:08,520 purchase that array at some point in the future, but what we found is that all of the arrays 1594 02:19:08,520 --> 02:19:14,920 that Durham has on our buildings or at this pit have experienced pretty significant problems 1595 02:19:14,920 --> 02:19:23,100 over time, that from my perspective, fortunately, the owner had to deal with rather than us. 1596 02:19:23,780 --> 02:19:29,100 And so I'm really not particularly enthusiastic about our moving on these and buying this 1597 02:19:29,100 --> 02:19:36,060 array, because we're just, you know, public works is so amazing, yet none of us are really 1598 02:19:36,060 --> 02:19:38,720 reversed in solar power management and maintenance, 1599 02:19:39,020 --> 02:19:41,100 and we don't, we're not staff for it either. 1600 02:19:41,820 --> 02:19:44,460 So at least for now, this is just a placeholder 1601 02:19:44,460 --> 02:19:46,300 in case at some point in the future, 1602 02:19:46,320 --> 02:19:47,940 it makes sense to move on it 1603 02:19:47,940 --> 02:19:51,760 and purchase the property or the panels 1604 02:19:51,760 --> 02:19:54,000 at a then depreciated rate. 1605 02:19:54,580 --> 02:19:58,280 But at least at this time, my working thinking 1606 02:19:58,280 --> 02:20:02,720 is that we would not, we just simply roll along every year. 1607 02:20:03,220 --> 02:20:06,300 Can I just ask just on that because that's very interesting. 1608 02:20:06,640 --> 02:20:11,740 So those are 2016, so I guess that's 10-year-old technology that's probably changed quite a bit. 1609 02:20:12,120 --> 02:20:19,220 And I guess when they fix that, do they replace it with the sort of the similar category of panel that was there before? 1610 02:20:19,500 --> 02:20:22,480 Do they, when they swap that out, do they kind of do an upgrade on that? 1611 02:20:22,700 --> 02:20:28,240 And we get kind of get the benefit of that without having to sort of pay for all that, or do we know? 1612 02:20:28,240 --> 02:20:49,140 I honestly don't know because we let the energy goes in to do the service for IGS solar and public works that's the men but they're not building us so our concern is is it producing power that then we're purchasing from them right. 1613 02:20:49,500 --> 02:20:50,840 I don't have an answer. 1614 02:20:52,790 --> 02:21:00,950 I think I would say on that if I can is most of times it's not the panel that fails it's 1615 02:21:00,950 --> 02:21:09,870 a very expensive to replace and they replaced one of those inverters at the Lee gravel pit 1616 02:21:09,870 --> 02:21:13,550 you know over the last you know five six years that I've been here. 1617 02:21:13,950 --> 02:21:22,050 And for example at a certain point time revision owned the panels on the library we subsequently 1618 02:21:22,050 --> 02:21:29,670 did buy those out. So Durham owns those now. But when revision did own the panels, that 1619 02:21:29,670 --> 02:21:34,030 was the year we had like squirrel topia. And there was this explosion of squirrels. 1620 02:21:34,470 --> 02:21:38,210 You may remember like there were dead squirrels on the road everywhere. And the squirrels 1621 02:21:38,210 --> 02:21:44,170 got into the wiring and the library and just really caused significant problems. And that was 1622 02:21:44,170 --> 02:21:50,970 all fully covered by revision at their cost, and they put up squirrel protection. So anyway, 1623 02:21:51,590 --> 02:21:57,770 just an example. All right, moving ahead to page 77, the road program. And Rich, would 1624 02:21:57,770 --> 02:22:01,830 you mind just giving an overview of the road program, please? Because it affects everybody. 1625 02:22:02,270 --> 02:22:08,250 And as you're looking at subdivisions and project zoning, it's important for you to have a sense 1626 02:22:08,250 --> 02:22:10,310 of how we deal with roads, I think. 1627 02:22:10,710 --> 02:22:13,930 Right, so we utilize, if you don't mind, 1628 02:22:14,130 --> 02:22:15,550 can I just share a quick slide? 1629 02:22:15,930 --> 02:22:18,530 It'll be easier to talk to this, if that's okay. 1630 02:22:18,670 --> 02:22:19,010 No problem. 1631 02:22:19,730 --> 02:22:22,710 Okay, let me see if I can do this real quick. 1632 02:22:35,640 --> 02:22:37,440 Let me know when you see that. 1633 02:22:38,620 --> 02:22:39,040 You're on. 1634 02:22:39,840 --> 02:22:40,400 Okay, great. 1635 02:22:41,300 --> 02:22:42,760 Can you zoom in on it a little more? 1636 02:22:44,160 --> 02:22:46,000 Yeah, I can do that. 1637 02:22:46,200 --> 02:22:46,860 Give me one sec. 1638 02:22:49,610 --> 02:22:50,230 How's that? 1639 02:22:52,270 --> 02:22:54,590 you know, or maybe go into presentation mode. 1640 02:22:54,890 --> 02:22:55,810 Yeah, good presentation. 1641 02:22:55,930 --> 02:22:57,190 Oh, okay, sorry about that. 1642 02:22:57,210 --> 02:22:58,250 Go with that little, yeah. 1643 02:23:03,290 --> 02:23:03,810 There we go. 1644 02:23:04,070 --> 02:23:04,670 Yeah, it's better. 1645 02:23:04,810 --> 02:23:05,630 That easier to say? 1646 02:23:05,850 --> 02:23:06,010 Yeah. 1647 02:23:06,790 --> 02:23:07,830 Okay, all right, great. 1648 02:23:08,670 --> 02:23:13,570 So, I've mentioned before, we utilize a software program 1649 02:23:14,970 --> 02:23:17,130 called CityLogix, Payment Management System, 1650 02:23:17,610 --> 02:23:21,630 and that allows us to really manage our full 59, 60 miles 1651 02:23:21,630 --> 02:23:25,250 of roadway network in a very methodical way, 1652 02:23:25,990 --> 02:23:32,890 Along with, you know, kind of ordination with other utility replacement, water mains, sewer lines, gas lines, if necessary. 1653 02:23:33,950 --> 02:23:38,690 And that gives us the, oh, I just went, hold on, there we go. 1654 02:23:39,210 --> 02:23:41,310 That allows us to coordinate all that. 1655 02:23:41,550 --> 02:23:47,090 What we tried to do, we just recently did a full assessment and evaluation of our road network. 1656 02:23:47,690 --> 02:23:50,990 And our goal is to try to keep that at an ADPCI. 1657 02:23:50,990 --> 02:23:57,450 that 80 PCI gives us the ability to manage that and hit some of these deteriorated roads 1658 02:23:57,450 --> 02:24:02,870 before they come very expensive to maintain and rehabilitate. 1659 02:24:03,650 --> 02:24:09,430 So I'm happy to say that our PCI is hovering right about 80, it's just under 80, the evaluation 1660 02:24:09,430 --> 02:24:16,610 is for this last summer, late summer early fall is still underway, they're doing the post-processing 1661 02:24:16,610 --> 02:24:19,690 work on that, we hope to get that back over the next couple weeks. 1662 02:24:19,690 --> 02:24:23,510 but we have been holding our own right around that ADPCI. 1663 02:24:24,510 --> 02:24:29,530 This, what we've observed lately is that some of these roads 1664 02:24:29,530 --> 02:24:32,950 that were treated with a drag shim, 1665 02:24:33,090 --> 02:24:35,970 which is a very thin overlay of pavement 1666 02:24:35,970 --> 02:24:39,190 about even less than a half an inch at times 1667 02:24:39,190 --> 02:24:42,110 based on the rutting of the roadway. 1668 02:24:42,470 --> 02:24:46,430 We're seeing some accelerated deterioration of those roads 1669 02:24:46,430 --> 02:24:48,810 and some of those roads are some of the major collectors 1670 02:24:48,810 --> 02:24:52,230 that we have in town, Durham Point Road, Mill Road, 1671 02:24:52,730 --> 02:24:55,290 Bennett Road, and Packers Falls Road. 1672 02:24:55,890 --> 02:24:59,770 So we developed this five-year action plan on our roadways 1673 02:24:59,770 --> 02:25:03,710 to address that, but also address some of these residential roads. 1674 02:25:03,910 --> 02:25:07,410 So you'll see in the book a very detailed five-year plan 1675 02:25:07,410 --> 02:25:10,570 for the road program. 1676 02:25:10,830 --> 02:25:14,630 This upcoming year, we hope to be able to, 1677 02:25:14,630 --> 02:25:24,950 We've requested about $734,000, which is a little more than we typically request, but really that's the that's the figure somewhere between 1678 02:25:25,900 --> 02:25:32,650 $650,000 that will need to invest in the roads to maintain that VVPCI. 1679 02:25:33,330 --> 02:25:36,910 The program for this year will consist of 1680 02:25:36,910 --> 02:25:42,270 Durham Point Road, both East and West, and you can see that in this figure right here 1681 02:25:42,270 --> 02:25:47,570 where my cursor is, those two roads, and it will be an inch and a quarter, so basically 1682 02:25:47,570 --> 02:25:50,070 a shin and overlay on that roadway. 1683 02:25:50,250 --> 02:25:56,590 And Rich, can I just clarify, because this is a question I had, when Rich says East and 1684 02:25:56,590 --> 02:25:58,530 West, he means the whole road. 1685 02:25:58,670 --> 02:26:01,690 There's not an additional center section that's not being done. 1686 02:26:01,890 --> 02:26:02,550 It's the whole road. 1687 02:26:03,190 --> 02:26:03,690 That's right. 1688 02:26:04,470 --> 02:26:07,210 and then it will also include Bay Road. 1689 02:26:07,410 --> 02:26:11,250 That's in a little bit better condition than Durham Point Road, 1690 02:26:11,350 --> 02:26:14,830 but it also is showing some pretty significant signs 1691 02:26:14,830 --> 02:26:16,170 of deterioration. 1692 02:26:16,830 --> 02:26:18,870 Ideally, we would like to go in there. 1693 02:26:19,310 --> 02:26:21,970 It's the base of the roadway is really what fails. 1694 02:26:22,570 --> 02:26:24,310 First, and then the rest of the road 1695 02:26:24,690 --> 02:26:26,750 could show signs of distresses. 1696 02:26:27,250 --> 02:26:30,830 We would love to go in there and box out 1697 02:26:30,830 --> 02:26:36,650 that entire roadway, 24 inches, put good gravels in there, and build it from the bottom up. 1698 02:26:37,110 --> 02:26:40,750 But it just costs prohibitive to do something like that. 1699 02:26:41,250 --> 02:26:47,490 So this treatment will give us that, you know, five to seven, nine years worth of, you 1700 02:26:47,850 --> 02:26:54,970 know, good drivability of the roadway while we continue to look for grant money to do this 1701 02:26:54,970 --> 02:27:01,390 in another fashion, possibly a reclaim of the roadway or maybe a cold-in-place recycling. 1702 02:27:02,190 --> 02:27:05,830 So I'll stop there for a second to see if there's any questions on that. 1703 02:27:09,040 --> 02:27:15,400 Rich, could you just touch on the efforts we've made to bring in federal grant money, 1704 02:27:15,580 --> 02:27:20,660 which have not been successful and what that grant money would have allowed that we're 1705 02:27:20,660 --> 02:27:22,940 not planning to do at this point in time? 1706 02:27:23,120 --> 02:27:24,960 Yeah, that's a great comment. 1707 02:27:24,960 --> 02:27:38,660 And so what we've tried to do, we've looked at this in a way that would allow us to really build this road in a complete streets fashion, very similar to Madbury Road, but a different application since it is a different type of roadway. 1708 02:27:39,300 --> 02:27:46,460 We've applied for a couple large grants. The most recent one was the Safe Streets and Roads for All. 1709 02:27:46,460 --> 02:27:52,260 and that is a highly competitive grant round. 1710 02:27:52,420 --> 02:27:54,940 It's a federal grant, and we put together 1711 02:27:54,940 --> 02:27:57,160 what we thought was a very solid package. 1712 02:27:57,380 --> 02:28:00,000 It would have allowed us to do safety improvements 1713 02:28:00,000 --> 02:28:03,660 on the roadway, cycling, improvements for cyclists 1714 02:28:03,660 --> 02:28:06,520 on that roadway, maybe some geometric changes 1715 02:28:06,520 --> 02:28:10,080 in the road, and unfortunately we were unsuccessful 1716 02:28:10,080 --> 02:28:12,560 to getting any grants for that. 1717 02:28:13,280 --> 02:28:15,820 There's some other grants that we applied for smaller, 1718 02:28:15,820 --> 02:28:21,120 but also we're not successful so we're going to continue to do that over the next 1719 02:28:21,120 --> 02:28:25,880 half dozen years and try to get full funding for some of these improvements that I 1720 02:28:25,880 --> 02:28:30,000 think we would all like to make on that roadway but at this point you know we're 1721 02:28:30,000 --> 02:28:35,740 trying to balance you know the road going into a complete failure mode as well as 1722 02:28:35,740 --> 02:28:40,640 those other roads that I mentioned and and being able to to maintain it at the 1723 02:28:40,640 --> 02:28:42,800 level that we think it's necessary. 1724 02:28:44,500 --> 02:28:52,820 Which do anticipate any changes to the scenic road other than resurfacing that people 1725 02:28:52,820 --> 02:28:54,660 should be aware of the concern about? 1726 02:28:55,840 --> 02:29:00,460 No, we'll be looking at the main concentration when we're doing a shaman overlay. 1727 02:29:00,680 --> 02:29:06,720 There'll be some shoulder gravel work that we do, maybe some other areas that we might be 1728 02:29:06,720 --> 02:29:09,680 We're looking at some failing culverts on the roadway. 1729 02:29:09,860 --> 02:29:16,100 There's some what we call CMP or corrugated metal culverts that may have some significant 1730 02:29:16,100 --> 02:29:18,300 kind of deterioration in their inverts. 1731 02:29:18,380 --> 02:29:22,620 So we wouldn't want to put money into the roadway without addressing some of those. 1732 02:29:22,620 --> 02:29:24,760 So we have a sense of which ones are failing. 1733 02:29:25,140 --> 02:29:29,080 So we may do that with our own internal forces to replace those. 1734 02:29:29,460 --> 02:29:33,720 But there won't be any significant changes, you know, as far as the scenic road goes. 1735 02:29:33,720 --> 02:29:36,700 So I'll stop sharing it. 1736 02:29:38,320 --> 02:29:43,400 And Rich, I was hopeful in terms of there are a lot of projects for public works. 1737 02:29:43,600 --> 02:29:47,660 Public works is the main part of the CIP project or plan. 1738 02:29:48,320 --> 02:29:54,700 But Rich, I was hoping as part of what you might talk about, you could touch upon the water 1739 02:29:54,700 --> 02:29:59,280 system improvements in wastewater facilities plan, but I didn't know if there are other 1740 02:29:59,280 --> 02:29:59,980 Prud- 1741 02:30:00,000 --> 02:30:02,780 Judge Exx that you think would be helpful for the planning board to hear about. 1742 02:30:12,550 --> 02:30:38,850 Did you hear that, Rich? Yeah, I did. I was just waiting. Was there anything else that we wanted to talk about before I get into that? No, okay. No. No. Okay. All right. So, um, so we have, um, we have a, a water main replacement program that we started. It was about four or five years ago that, um, addresses the 209 miles of, of water main that we have. Um, when we look at the miles or of water 1743 02:30:38,850 --> 02:30:47,010 main and the condition, the type of material and the age, you know, we look at break history 1744 02:30:47,010 --> 02:30:52,110 and we want to avoid breaks whenever possible, especially on these newly paved roadways. 1745 02:30:52,670 --> 02:31:00,050 So what we try to do is combine our roadway work with utility work and in this case that 1746 02:31:00,050 --> 02:31:01,850 utility work is water main. 1747 02:31:02,050 --> 02:31:07,110 We also look at sewer, you know, mains at the same time and work with the gas companies. 1748 02:31:07,110 --> 02:31:10,710 but we accumulate money over a period of time, 1749 02:31:10,710 --> 02:31:14,910 typically this $75,000, we should be in a lot of speed 1750 02:31:14,910 --> 02:31:17,450 when we look at all those components of a water main 1751 02:31:17,450 --> 02:31:21,030 and what a replacement plan should be based 1752 02:31:21,030 --> 02:31:22,550 on age of a water main. 1753 02:31:23,110 --> 02:31:26,750 We should be putting much more in than $75,000, 1754 02:31:26,770 --> 02:31:28,510 hundreds of thousands of dollars into that, 1755 02:31:28,610 --> 02:31:30,450 but it's unrealistic to do that. 1756 02:31:30,610 --> 02:31:34,410 So what we do is accumulate money over a period of time 1757 02:31:34,410 --> 02:31:41,210 and we target a specific roadway when we have enough of that funding, we then go ahead 1758 02:31:41,210 --> 02:31:46,730 and do the water main typically the year before, do a temporary patch, and then come back the 1759 02:31:46,730 --> 02:31:53,830 next year with the road program and reclaim and pave that roadway typically. So in this case, 1760 02:31:54,110 --> 02:32:02,030 on the town water system improvements for $75,000, that will be used with, so the FY27 funding will 1761 02:32:02,030 --> 02:32:09,710 contribute toward a $200,000 project that we anticipate will be replacing the cast iron 1762 02:32:09,710 --> 02:32:16,070 water main on the first section of Davis Avenue. If you look down where the Edgewood and Davis 1763 02:32:16,070 --> 02:32:21,230 intersection is and you glance toward your right as you're going toward campus, you'll see at that 1764 02:32:21,230 --> 02:32:27,550 early section there's three pavement patches there and those three pavement patches are there 1765 02:32:27,550 --> 02:32:31,230 because we had three water mean breaks that needed to be repaired. 1766 02:32:32,050 --> 02:32:38,170 So that will be our concentration in 2030 road program will be Davis Avenue 1767 02:32:38,170 --> 02:32:44,170 and we'll be doing the water main just before that work and conjunction with that project. 1768 02:32:45,510 --> 02:32:48,030 Any questions on water mean? 1769 02:32:50,920 --> 02:32:52,740 And that just has one question. 1770 02:32:53,080 --> 02:32:56,240 I think you sort of touched on it. 1771 02:32:56,240 --> 02:33:01,760 which is the public works department as a large portion of the budget. 1772 02:33:02,540 --> 02:33:06,540 And when we think about planning, it would seem that we would want to try to consolidate. 1773 02:33:07,820 --> 02:33:14,340 Or use these resources to the maximum amount that we could, which I guess when I think about that, 1774 02:33:14,500 --> 02:33:22,480 I would say that you would want to almost start to try as best as you can to consolidate density where you have these services. 1775 02:33:22,480 --> 02:33:28,920 is where you get the biggest bank for your buck when you implement an updated road or updated fix. 1776 02:33:29,720 --> 02:33:34,880 In other words, it seems obvious that when you update a rural road, a few people benefit from that. 1777 02:33:34,940 --> 02:33:40,340 But if you have greater density and you update a road that's in a dense area, you get a bigger bank for the buck. 1778 02:33:40,680 --> 02:33:45,080 So I guess from a planning perspective, it would seem that we would want to try, I think, 1779 02:33:45,080 --> 02:33:51,760 to consolidate an increased density where we have these services and where you can get a two for one or 1780 02:33:51,760 --> 02:33:59,180 a three-for-one benefit versus a smaller benefit down on the rural area. 1781 02:33:59,940 --> 02:34:03,660 I don't know if there are any thoughts about that, but in terms of the capital outlay 1782 02:34:03,660 --> 02:34:08,600 for these things, it would seem that the denser we go in certain areas, the bigger bang 1783 02:34:08,600 --> 02:34:09,340 we get for the buck. 1784 02:34:10,900 --> 02:34:13,460 That maybe is both a question and a statement, I think. 1785 02:34:15,120 --> 02:34:16,040 I would agree. 1786 02:34:16,880 --> 02:34:20,940 I mean, if you look, a good example would be comparing the state of New Hampshire to the 1787 02:34:20,940 --> 02:34:27,680 state of Maine. Maine is a significantly larger state in terms of geographic area, and 1788 02:34:27,680 --> 02:34:33,880 that means they have huge networks of roadways to very small populated areas that they have 1789 02:34:33,880 --> 02:34:40,180 to maintain at significant cost. Where New Hampshire is a smaller geographic area and we can 1790 02:34:40,180 --> 02:34:44,440 put that we have better economies of scale in terms of those investments. But what I can 1791 02:34:44,440 --> 02:34:50,780 say is we don't have any money targeted toward building new roads in Durham. We're simply 1792 02:34:50,780 --> 02:34:57,420 maintaining what we have. And I don't know, Rich, like, is there, if a road is more rural, 1793 02:34:57,880 --> 02:35:06,280 are you likely to see less wear and tear on it and therefore a need to get in and repair it? 1794 02:35:06,780 --> 02:35:12,160 Fewer times over time than a more frequently traveled road or how's that work? 1795 02:35:12,900 --> 02:35:19,360 Yeah, definitely. I think, you know, certainly, you know, average daily traffic on a roadways 1796 02:35:19,360 --> 02:35:25,920 and the type of traffic plays a big part in the degradation of that roadway and I touched 1797 02:35:25,920 --> 02:35:32,820 on the city logic software platform that we use and developing a PCI or a pavement condition 1798 02:35:32,820 --> 02:35:41,480 index, but from there we also have another kind of data point that comes out of that and it's called 1799 02:35:41,480 --> 02:35:47,720 a benefit value index and it's exactly what you just said, Peyton, where we look at average daily 1800 02:35:47,720 --> 02:35:53,580 traffic, cost of repair, longevity of the repair, all these different components go into 1801 02:35:53,580 --> 02:36:00,440 this algorithm that then allows us to prioritize some of these some of these on roadways and 1802 02:36:00,440 --> 02:36:07,140 it will come out with a plan that is recommended and we then look at that and we use other engineering 1803 02:36:07,140 --> 02:36:13,880 judgment and timing to say okay maybe it came out with this roadway but we also have a water 1804 02:36:13,880 --> 02:36:17,960 replacement or a sewer replacement or we know the gas company wants to come in there 1805 02:36:17,960 --> 02:36:24,200 so we would defer that so there is there is a lot of the additional analysis that goes into it. 1806 02:36:24,320 --> 02:36:29,960 It's not just PCI it's the BVI benefit value index that helps drive some of the decisions 1807 02:36:29,960 --> 02:36:36,840 that we make. I think sidewalks is more where we might see that stretch and the riverwoods is a 1808 02:36:36,840 --> 02:36:42,660 good example where our sidewalk previously did not go out as far as riverwoods. It was on the 1809 02:36:42,660 --> 02:36:45,280 the Durham side of the route for overpass. 1810 02:36:46,740 --> 02:36:49,240 And once Riverwoods was constructed, 1811 02:36:49,580 --> 02:36:51,480 the residents there said, well, we want a sidewalk. 1812 02:36:52,120 --> 02:36:53,880 So Durham's response is, well, Riverwoods, 1813 02:36:53,920 --> 02:36:56,520 if you want the sidewalk, you build the sidewalk. 1814 02:36:56,940 --> 02:36:58,320 So they paid to build the sidewalk, 1815 02:36:58,640 --> 02:37:00,180 but we accepted the sidewalk. 1816 02:37:00,420 --> 02:37:03,560 And now, over time, we're going to have to spend text 1817 02:37:03,560 --> 02:37:04,880 others to maintain that sidewalk. 1818 02:37:05,460 --> 02:37:10,500 So it does make sense to consolidate development 1819 02:37:10,500 --> 02:37:13,280 in areas where there are already sidewalks, 1820 02:37:13,460 --> 02:37:15,540 so we don't have to extend infrastructure 1821 02:37:15,540 --> 02:37:18,020 and maintain it and have additional staff 1822 02:37:18,020 --> 02:37:19,120 to take care of it, et cetera. 1823 02:37:20,500 --> 02:37:23,120 Water and sewer lines might be the same scenario. 1824 02:37:23,840 --> 02:37:25,340 It's best to keep it compact, 1825 02:37:25,600 --> 02:37:28,220 rather than long lines going out to very rural areas. 1826 02:37:29,020 --> 02:37:30,620 Yeah, Michael. 1827 02:37:30,960 --> 02:37:32,400 So while we have Rich here, 1828 02:37:33,760 --> 02:37:35,700 I don't know if you were watching the earlier segment 1829 02:37:35,700 --> 02:37:37,280 of the planning board meeting or not, 1830 02:37:37,600 --> 02:37:38,040 before this. 1831 02:37:38,040 --> 02:37:41,400 Yes. Okay. So we're talking about Tech Drive. Yes. 1832 02:37:41,740 --> 02:37:48,280 Do you have a schedule that indicates when Tech Drive might be on the list of things to 1833 02:37:49,200 --> 02:37:58,480 read? We do. We do. It's not in the five year plan, but we have mentioned to, you know, 1834 02:37:58,480 --> 02:38:08,400 two Sean and the group at RJ Kelly that predominantly the where and impact of the roadway currently 1835 02:38:08,400 --> 02:38:16,340 is with the 90 tractor trailers that that road sees each day. So we are going to have further 1836 02:38:16,340 --> 02:38:25,840 discussions with them about potential exactions on that roadway to allow for the condition to be 1837 02:38:25,840 --> 02:38:31,660 We improved after their major construction takes place because the truck traffic on that 1838 02:38:31,660 --> 02:38:34,220 roadway is only going to increase over time. 1839 02:38:34,840 --> 02:38:38,500 So we want to make sure that we have that discussion early on. 1840 02:38:38,960 --> 02:38:43,060 And the same thing goes with the sidewalk that you guys keyed in on earlier. 1841 02:38:43,640 --> 02:38:50,190 We have those same concerns and that's why we are including that in the scope that we'll 1842 02:38:50,190 --> 02:38:57,190 be working with APEX on to look at the traffic impact study that was done in the third-party 1843 02:38:57,190 --> 02:38:57,610 review. 1844 02:38:57,910 --> 02:38:59,490 So, I think those are all things. 1845 02:38:59,950 --> 02:39:03,010 We don't have tech drive in the five-year action plans. 1846 02:39:03,010 --> 02:39:11,370 You won't see that come through this existing capital plan, but it will need to be addressed 1847 02:39:11,370 --> 02:39:17,870 and we hope that we can work with RJ Kelly to come up with a reasonable approach on that. 1848 02:39:18,470 --> 02:39:18,910 Thank you. 1849 02:39:18,910 --> 02:39:23,370 So one more question also, because the other thing is that, as you know, we're starting 1850 02:39:23,370 --> 02:39:29,470 to look at the issue of zoning in the around the central business district area, in the 1851 02:39:29,470 --> 02:39:30,210 built-up areas. 1852 02:39:30,630 --> 02:39:33,990 And a question come up in an earlier planning board meeting, at least two or three, maybe 1853 02:39:33,990 --> 02:39:42,090 four meetings ago, about what studies exist and part of my ignorance on water and wastewater 1854 02:39:42,090 --> 02:39:44,590 capacities in those areas. 1855 02:39:44,590 --> 02:39:48,610 is so as we're starting to think about what might happen to those in terms of 1856 02:39:48,610 --> 02:39:53,470 densities and stuff, are we facing limitations or are we all good to go and 1857 02:39:53,470 --> 02:39:57,010 sort of what what what's the knowledge base that exists that can be shared with 1858 02:39:57,010 --> 02:40:01,070 the planning board? Yeah it's a great question Michael and I think the other thing 1859 02:40:01,070 --> 02:40:07,910 that we need to think about is not only capacity to collect and treat waste water 1860 02:40:07,910 --> 02:40:13,750 or distribute up and treat and distribute water but it's a condition of those 1861 02:40:13,750 --> 02:40:22,830 that infrastructure that's there now, and can it support additional capacity either collection or distribution. 1862 02:40:23,450 --> 02:40:25,710 And the same thing goes with stormwater. 1863 02:40:25,870 --> 02:40:35,030 We certainly in the downtown area, we do have some constraints on stormwater in our closed training system. 1864 02:40:35,730 --> 02:40:39,970 And we've addressed a bunch of that with the Madbury Road Project. 1865 02:40:39,970 --> 02:40:55,110 But on the other side, basically the Petty Brook side where the Petty Brook parking lot is and the collection system on that side that flows toward Petty Brook, that still has some some challenges as far as available capacity. 1866 02:40:55,770 --> 02:40:58,950 In fact, it doesn't have available capacity at this point. 1867 02:40:58,950 --> 02:41:04,150 It surges in 10-year storms and floods. 1868 02:41:04,690 --> 02:41:09,850 It just doesn't have the capacity, the pipe capacity for additional flow. 1869 02:41:10,690 --> 02:41:20,770 So it's not only just overall the capacity to distribute or collect, but it's also conditioned. 1870 02:41:21,410 --> 02:41:24,030 We do have some pretty good sense. 1871 02:41:24,030 --> 02:41:32,650 We had a grant that we received from the state $100,000 to do a west end sewer study to 1872 02:41:32,650 --> 02:41:41,270 determine what type of capacity constraints do we have from the hedge and this technology 1873 02:41:41,270 --> 02:41:43,170 drive development. 1874 02:41:43,770 --> 02:41:50,090 And we know that there are some choke points leading to the interceptors. 1875 02:41:50,090 --> 02:41:52,270 So that's the College Book Interceptor. 1876 02:41:52,350 --> 02:41:57,690 There's a very small pipe that is actually under the fire department, underneath the rail 1877 02:41:57,690 --> 02:42:00,170 road and under the building itself. 1878 02:42:00,950 --> 02:42:05,150 So that's something that we have to take into account as we look at, you know, taking 1879 02:42:05,150 --> 02:42:11,670 on more flow and what the, you know, what type of upgrades might be necessary from, you know, 1880 02:42:11,750 --> 02:42:13,630 the developer over those applicants are. 1881 02:42:14,150 --> 02:42:19,810 So all those things I come into play as we do, I get a review of a project that might come 1882 02:42:19,810 --> 02:42:20,870 in front of the planning board. 1883 02:42:22,390 --> 02:42:26,850 But is there a study that looks at the supply of water 1884 02:42:26,850 --> 02:42:30,290 and sewage capacity for the areas around downtown? 1885 02:42:30,430 --> 02:42:34,490 Yeah, we have a hydraulic model that we have 1886 02:42:34,490 --> 02:42:39,310 that underwood engineers basically has that, 1887 02:42:39,430 --> 02:42:40,350 and we work with them. 1888 02:42:40,530 --> 02:42:43,750 So for example, the RJ Kelly, you heard him ask about the, 1889 02:42:43,910 --> 02:42:46,030 oh, I'm sorry, I just wanted to know if something exists. 1890 02:42:46,290 --> 02:42:47,910 OK, I just know I hydraulic my. 1891 02:42:48,230 --> 02:42:48,590 Thank you. 1892 02:42:51,330 --> 02:43:00,030 So just getting into the lease water facilities plan, we're asking for $425,000 to continue 1893 02:43:00,030 --> 02:43:05,150 to implement some of the components of the lease water facilities plan. 1894 02:43:06,010 --> 02:43:13,350 This is a plan that, this is a request that is split two-thirds, one-third by UNH and 1895 02:43:13,350 --> 02:43:13,710 the town. 1896 02:43:13,710 --> 02:43:20,870 So we pay for one third of that UNH pays for two-thirds of that all the capital projects are allocated that way 1897 02:43:20,870 --> 02:43:28,330 You can imagine the wastewater treatment plant and the whole collection system is is very very complex 1898 02:43:28,330 --> 02:43:33,550 It has many many large pumps blowers motors tankage 1899 02:43:33,550 --> 02:43:42,510 clinical equipment, scale electronics, PLCs, you name it, and all of these things have a certain useful life. 1900 02:43:43,070 --> 02:43:49,950 We have a master of facilities master plan that allows us, in fact, we're in the process of updating that right now. 1901 02:43:50,750 --> 02:43:58,690 That is something that allows us to predict what needs to be replaced, what's approaching the end of its useful life, 1902 02:43:58,690 --> 02:44:28,490 What we need to upgrade from a regulatory standpoint to meet our permit conditions and one of the things that is coming down the pike and you'll see that I would encourage you to read those two documents that I included this year in the capital plan on both the roads and the approach that we're taking in the recommendations but also on the wastewater facilities plan that goes into a little bit of detail about some of the upcoming challenges that we have. 1903 02:44:28,490 --> 02:44:37,170 on treatment within a new permit that was issued for our waste water treatment plant having to do with copper and 1904 02:44:37,170 --> 02:44:44,930 treating copper and managing that pollutant. So a lot of this this funding that we get the one-third of the 1905 02:44:45,450 --> 02:44:54,110 425,000 and the two-thirds of the UNH portion goes into that regulatory compliance and upkeeping of the waste water collection 1906 02:44:54,110 --> 02:44:57,690 and system and pump stations and things like that. 1907 02:44:57,950 --> 02:44:59,970 And just to know that... 1908 02:45:00,000 --> 02:45:14,320 Unlike the fire department agreement with UNH where we split the cost for operation and capital 5050 with the water and waste water department's capital is two thirds UNH one third Durham. That's the cost here. 1909 02:45:17,260 --> 02:45:31,340 So the last item I just wanted to briefly touch on was the rank renovation and recreation center project, which is on page 147. You'll see that's targeted for construction in 2029. 1910 02:45:31,940 --> 02:45:55,640 that would be, as envisioned, all fundraising, whether that's viable or not, I don't know at this point in time, but I just wanted to flag that for you, so you could see that there's a funding in 27, which comes from the Rinc Fund 28 requested and then 29 for the major project. 1911 02:45:55,640 --> 02:46:04,680 And I'll note that following Bill's presentation to the planning board last month, we received 1912 02:46:04,680 --> 02:46:11,860 a call from the New Hampshire Division of Parks and Recreation, because in the early 1913 02:46:11,860 --> 02:46:19,740 2000s, we received a grant for maybe $20 to $30,000 to build a trail system at Wagonhill 1914 02:46:19,740 --> 02:46:20,080 Farm. 1915 02:46:20,080 --> 02:46:22,360 and as part of that- 1916 02:46:22,360 --> 02:46:24,020 At the rink? At Jackson's Laney. 1917 02:46:24,300 --> 02:46:26,980 Yes, I'm sorry, at the rink at Jackson's Laney. 1918 02:46:27,580 --> 02:46:29,620 And as part of that agreement, 1919 02:46:29,980 --> 02:46:33,600 we committed to leave everything there, 1920 02:46:34,220 --> 02:46:36,220 open air and external. 1921 02:46:36,520 --> 02:46:38,840 So that would, it seems, 1922 02:46:39,040 --> 02:46:44,140 preclude us from covering and not covering, 1923 02:46:44,400 --> 02:46:46,200 but making the rink an indoor facility. 1924 02:46:46,760 --> 02:46:48,980 So we're following up with the division 1925 02:46:48,980 --> 02:46:54,420 of Parks and Recreation just to learn more. So stay tuned. 1926 02:46:55,960 --> 02:47:03,760 Well, that's what they're asserting. Yes. So we'll see what that in fact means in practice. 1927 02:47:04,600 --> 02:47:09,840 But beyond that, we are happy to answer any and all questions that you may have. 1928 02:47:12,060 --> 02:47:13,260 Yes, yes. 1929 02:47:14,220 --> 02:47:19,720 Just one, I noticed that a lot of the bonding is through the New Hampshire Municipal Bond. 1930 02:47:20,860 --> 02:47:27,920 I guess that's a bank and that it was tagged at 2.9% which seems low to me right now and 1931 02:47:27,920 --> 02:47:31,300 it seems like I would, if you're getting that, that seems like a good right. 1932 02:47:31,500 --> 02:47:37,080 I just was wondering what the, any ideas what the rate would be, it feels like it would be 1933 02:47:37,080 --> 02:47:42,180 more like mid-3s but I'm not sure and then if that rate changes how much does it impact 1934 02:47:42,180 --> 02:47:44,620 the ability to do these projects? 1935 02:47:45,120 --> 02:47:53,920 Yeah, so we will fluctuate between going out and issuing a bond ourselves, or participating with the New Hampshire Municipal Bond Bank. 1936 02:47:54,680 --> 02:47:58,440 The benefit of working with the Bond Bank is it's easier on the business office. 1937 02:47:58,600 --> 02:48:00,640 There are fewer steps because they handle most of it. 1938 02:48:01,100 --> 02:48:07,300 And they aggregate the bonding needs of towns and cities and school districts and counties to get a better rate. 1939 02:48:07,300 --> 02:48:16,480 And so the rates that you see cited are the actual rates from the last issuance, and that's the best information they have for us. 1940 02:48:16,920 --> 02:48:29,160 Now, the Federal Reserve just did increase rates by the quarter percent, so that would flow down to the bond bank when they issue their next set of debt, but this is the best information we have. 1941 02:48:29,940 --> 02:48:31,000 So, it's an estimate. 1942 02:48:31,000 --> 02:48:31,420 I 1943 02:48:37,120 --> 02:48:39,760 just want to recognize and thank Gail Jablanski. 1944 02:48:40,220 --> 02:48:46,920 This is her final CIP presentation for her years of service and great work on behalf 1945 02:48:46,920 --> 02:48:47,320 of the town. 1946 02:48:49,700 --> 02:48:50,080 Thank you. 1947 02:48:50,340 --> 02:48:50,520 All right. 1948 02:48:51,400 --> 02:48:52,180 Thank you. 1949 02:48:52,380 --> 02:48:52,540 All right. 1950 02:48:52,660 --> 02:48:58,760 So I'm more to come in the next month and a half will be really vetting all of this much 1951 02:48:58,760 --> 02:49:06,140 more and finalizing a document which would go to the council for review there and eventually 1952 02:49:06,140 --> 02:49:07,220 approval in some form. 1953 02:49:07,220 --> 02:49:08,500 So thank you. 1954 02:49:09,140 --> 02:49:09,660 Have a great day. 1955 02:49:10,480 --> 02:49:10,580 Yes. 1956 02:49:11,100 --> 02:49:14,740 Well, thanks for all that you all do, for everything you all do. 1957 02:49:14,900 --> 02:49:22,240 It's amazing all the details behind the scenes that are not always seen but that are taken 1958 02:49:22,240 --> 02:49:22,720 care of. 1959 02:49:22,920 --> 02:49:27,820 So it's I think you do a terrific job and the detail is outstanding. 1960 02:49:27,820 --> 02:49:29,160 And so thank you. 1961 02:49:30,400 --> 02:49:34,000 The Durham team is small but mighty. 1962 02:49:34,500 --> 02:49:34,900 Great job. 1963 02:49:49,250 --> 02:49:59,490 That was a question for the packet, okay, we'll send them for the next meeting then. 1964 02:50:00,110 --> 02:50:00,330 All right. 1965 02:50:02,150 --> 02:50:03,790 Is there any other business? 1966 02:50:05,830 --> 02:50:13,110 So, Mr. Chairman, we're not going to give the town administrator any suggestions or advice. 1967 02:50:15,980 --> 02:50:16,480 Do you have? 1968 02:50:16,720 --> 02:50:17,760 Do we have some suggestions? 1969 02:50:18,960 --> 02:50:25,100 About three or four hours worth, so I'll pass it on to him privately. 1970 02:50:25,820 --> 02:50:26,000 Okay. 1971 02:50:26,260 --> 02:50:26,960 That's great. 1972 02:50:27,740 --> 02:50:28,500 I don't want to. 1973 02:50:28,760 --> 02:50:32,560 Todd, I really appreciate all the work you've put into this. 1974 02:50:32,560 --> 02:50:42,400 But my reaction to this budget from the one last year, the CIP, the last two years before 1975 02:50:42,400 --> 02:50:46,500 this, is that so much has been pushed off and pushed back. 1976 02:50:48,460 --> 02:50:58,380 We may not be able to afford to do the things we really need to do unless we have a lot 1977 02:50:58,380 --> 02:51:02,260 A lot of millionaires settling here and building 1978 02:51:02,260 --> 02:51:04,400 Mac mansions and paying huge taxes 1979 02:51:05,160 --> 02:51:07,620 and not putting any kids in the school system, 1980 02:51:07,880 --> 02:51:09,120 et cetera, et cetera, et cetera. 1981 02:51:09,820 --> 02:51:12,860 But I don't see that happening. 1982 02:51:13,220 --> 02:51:23,160 So I think we're in danger of being an unaffordable community 1983 02:51:23,160 --> 02:51:35,800 for many people. But that's the result of having been here when the town offices were 1984 02:51:35,800 --> 02:51:46,780 in the old courthouse. We had a town clerk. We didn't have a town administrator. The police 1985 02:51:46,780 --> 02:51:52,600 station was in the courthouse. Public works had a little building in a parking lot. 1986 02:51:53,400 --> 02:52:05,420 So we have really built a wonderful community with many departments, with many employees 1987 02:52:05,420 --> 02:52:15,480 these providing wonderful services, but we're going to have to find some way to have more 1988 02:52:15,480 --> 02:52:22,700 revenue coming in, so but I think you all know that, so thank you, Todd. 1989 02:52:23,380 --> 02:52:32,940 I would just say that with the projects in the CIP that have been requested, again, what 1990 02:52:32,940 --> 02:52:38,560 What you have before is not the final version, but in the initial vetting, the vast majority 1991 02:52:38,560 --> 02:52:46,420 of them are simply continued investment in the infrastructure needed to provide the services 1992 02:52:46,420 --> 02:52:49,200 that we currently provide in a reliable way. 1993 02:52:49,600 --> 02:52:52,800 There's not a lot of extra in here. 1994 02:52:52,960 --> 02:52:54,600 There's really not any extra in here. 1995 02:52:54,740 --> 02:52:57,820 Other than the rink, the rink would be an example. 1996 02:52:59,020 --> 02:53:02,080 That would be something new, something different. 1997 02:53:02,080 --> 02:53:05,640 something better, bigger, providing more services. 1998 02:53:06,060 --> 02:53:07,180 That's a new thing. 1999 02:53:08,020 --> 02:53:12,640 But replacing the ladder truck or the dump truck 2000 02:53:12,640 --> 02:53:17,500 in public works, the new truck would replace an older truck 2001 02:53:17,500 --> 02:53:21,560 that really should be replaced because we rely on it, 2002 02:53:21,800 --> 02:53:24,680 as a frontline vehicle during the most critical times. 2003 02:53:26,020 --> 02:53:29,020 And for pieces of equipment like that, we've carefully 2004 02:53:29,020 --> 02:53:36,480 valued whether it would be possible to go electric or to go hybrid versus the traditional 2005 02:53:37,080 --> 02:53:40,800 diesel type vehicle we use, and there's not a viable option. 2006 02:53:40,980 --> 02:53:46,260 So we're doing it, we believe, in the most efficient way to do that basic important 2007 02:53:46,260 --> 02:53:48,100 public safety task. 2008 02:53:50,500 --> 02:53:57,360 So anyhow, there's, you know, the Medbury Road Complete Streets project, much of that was 2009 02:53:57,360 --> 02:54:03,020 required to do, the water needed to be done, the waste water needed to be done, the storm water there needed to be done. 2010 02:54:03,380 --> 02:54:10,780 It needed to be repaved, and for a modest additional investment, Durham got something really special. 2011 02:54:11,960 --> 02:54:16,680 And could the Council have chosen not to take that extra step it could have, but 2012 02:54:16,680 --> 02:54:21,760 it opted based on a lot of feedback from the public to move ahead without enhancement. 2013 02:54:22,220 --> 02:54:23,100 So we have an enhancement. 2014 02:54:23,100 --> 02:54:30,160 The Milpine Dam is another example, it's a project that we had to do something, it's a 2015 02:54:30,160 --> 02:54:35,320 big change, there's a cost, it's not free, but we had to take action in some way. 2016 02:54:35,560 --> 02:54:38,200 And the council, the town made a decision. 2017 02:54:39,260 --> 02:54:42,180 So just to respond, yeah. 2018 02:54:42,440 --> 02:54:51,940 If I had one bit of advice to give, is that take the very last item in the CIP, the item 2019 02:54:51,940 --> 02:54:59,000 is to purchase Sammy's lock from the university in 2033 for one and a half million dollars. 2020 02:55:00,490 --> 02:55:10,880 I suggest we work to acquire that lock now, sooner rather than later, so the town would 2021 02:55:10,880 --> 02:55:20,940 be in a better position to negotiate with potential developers who want to take the large amount 2022 02:55:20,940 --> 02:55:26,800 of property on Main Street and the business, central business district that backs up the 2023 02:55:26,800 --> 02:55:40,260 semis a lot, and be able to work out a development plan that will integrate that town property 2024 02:55:40,640 --> 02:55:43,480 with the private properties facing Main Street. 2025 02:55:43,480 --> 02:55:49,980 And frankly, I think the university has taken so many things away from us, our library, 2026 02:55:52,440 --> 02:56:00,940 the pool, which used to be a talent pool, etc., that it might be time for the university 2027 02:56:00,940 --> 02:56:05,060 to give us something back, to give us Sammy's lot. 2028 02:56:05,060 --> 02:56:17,060 Oh, all right. Well, just so like with so many of the projects in the SAP, there's a lot to unpack with each of them, but I would just say in terms of the 2029 02:56:18,460 --> 02:56:32,120 Sammies also called the store 24 lot also called the to desky lot. We now called the Bobcat lot. It's the lot behind what is was youngs is now Clarks. That's right. It's that long. 2030 02:56:32,120 --> 02:56:34,280 on the south side of. 2031 02:56:34,420 --> 02:56:36,160 So just so people know what we're talking about, 2032 02:56:36,160 --> 02:56:39,180 that lot was part of one of the original 2033 02:56:39,180 --> 02:56:42,800 Thompson bequests to the university or to the state. 2034 02:56:43,720 --> 02:56:47,380 And it literally takes an act of the state legislature 2035 02:56:48,150 --> 02:56:51,640 to sell pieces of that. 2036 02:56:52,360 --> 02:56:55,780 And the university does not have an interest at the present time 2037 02:56:56,380 --> 02:56:59,520 in going to the legislature for such a request. 2038 02:56:59,520 --> 02:57:04,760 And my guess is, it's unlikely the legislature would provide it. 2039 02:57:05,120 --> 02:57:09,800 And one never knows what they might do with the idea, if it's raised to them, 2040 02:57:10,380 --> 02:57:14,380 with the current composition of this or future of legislatures. 2041 02:57:14,540 --> 02:57:17,880 So I agree with you, I think Durham should own that lot. 2042 02:57:18,320 --> 02:57:22,700 And have tried to move in a way that would allow us to acquire it. 2043 02:57:23,320 --> 02:57:28,340 And in fact, a year ago, I had a serious conversation with 2044 02:57:28,340 --> 02:57:32,160 the planning team at UNH and the finance team at UNH 2045 02:57:32,160 --> 02:57:37,820 to see whether that might make sense for UNH to sell it to Durham 2046 02:57:38,320 --> 02:57:40,760 as part of the broader Edge at West End project 2047 02:57:41,760 --> 02:57:44,380 which would enable Durham to acquire the parcel 2048 02:57:44,380 --> 02:57:47,280 UNH to receive some cash from Durham 2049 02:57:47,280 --> 02:57:51,960 that it could then use toward the Edge at West End project. 2050 02:57:52,700 --> 02:57:56,560 But after legal review and political review 2051 02:57:56,560 --> 02:57:59,720 it was determined by UNH, there was no interest. 2052 02:58:00,560 --> 02:58:03,020 So that is simply a placeholder. 2053 02:58:03,360 --> 02:58:06,720 And then I would just note that the former UNH 2054 02:58:06,720 --> 02:58:10,440 outdoor pool built during the works project administration 2055 02:58:10,440 --> 02:58:13,540 was never owned by the town of Durham ever. 2056 02:58:13,820 --> 02:58:16,440 It was always a University of New Hampshire facility 2057 02:58:17,080 --> 02:58:19,100 owned and operated by UNH. 2058 02:58:19,920 --> 02:58:23,280 Durham made a modest contribution to subsidize 2059 02:58:23,280 --> 02:58:31,940 the cost of passes for that but well action that's an old argument we've had for a long 2060 02:58:31,940 --> 02:58:36,860 a lot of reasons it's time came and went and we have a new pool and I would argue 2061 02:58:37,740 --> 02:58:42,640 one of the best pools in the state of New Hampshire that's available to Durham residents at 2062 02:58:42,640 --> 02:58:49,500 no cost whatever in terms of building construction or maintenance. Durham got such a deal 2063 02:58:49,500 --> 02:58:55,720 and we don't have residents swimming in a pool that did not meet any of the 2064 02:58:55,720 --> 02:59:02,920 modern health and safety standards. Okay so there's that too. Thank you 2065 02:59:02,920 --> 02:59:09,980 Todd. Thank you. Motion to adjourn. Second. 2066 02:59:13,920 --> 02:59:24,680 That was a motion to adjourn it was yes, so I'll just say it outside of the me so to joy and