[0:07] All right, welcome everyone. Um, we'll [0:09] be getting started here in just a [0:11] moment. Right at 7 o'clock, we'll kick [0:14] things off. So yeah, just about a minute [0:17] from start time. [0:35] Okay, so yeah, it's 7 o'clock. Um, good [0:37] evening and thanks for joining us for [0:39] the community information meeting. Uh my [0:41] name is Nathan Seammens and I'm in the [0:43] communications department at the RDUK. [0:45] Um before I hand it over to Director [0:47] Clochuk, I'd like to just give a quick [0:49] rundown on what to expect this evening. [0:51] Uh first off, the meeting is being [0:54] recorded, so got that out of the way [0:56] right away. And we will be posted on the [0:58] engage page at engage.rdek.bc.ca/debris. [1:04] And we'll get that up within the next [1:06] day, maybe two. Um once the recording [1:10] recorded meeting is posted, we will send [1:12] out an email with the link. Um and so if [1:14] you're not signed up for the community [1:16] emails, uh you can do that by visiting [1:18] rdk.bc.ca [1:21] and clicking the stay informed link at [1:23] the top of your page. Um so after [1:26] director clochuk's introductions and the [1:28] staff presentations, we will be [1:30] answering the questions from all the [1:32] attendees. [1:34] So, um, in the interest of time and [1:36] clarity, we'll be using Zoom's Q&A tool [1:39] to collect the questions. You can find [1:40] that at the bottom of your screen. It's [1:42] a little question mark and says Q&A. Um, [1:46] so yeah, we'll be using the Q&A tool and [1:48] we will also be going through the [1:50] questions that were submitted on the [1:51] project engage page at that time. Uh, [1:54] we'll attempt to address all of the [1:55] questions in the order that they are [1:57] received. And if your question pertains [2:00] to a specific slide during the [2:01] presentation, please try to reference [2:04] that slide number. Slide numbers are in [2:06] the upper right of each slide. The [2:08] reason we're asking this is just [2:11] um so that we can the answerer of the [2:13] question can be certain as to what [2:16] they're answering. If you missed the [2:19] slide number, that's no problem. Please [2:20] still answer or ask your question. Um [2:23] yeah, and now I'll pass it on to [2:24] Director Clchuk. [2:26] » Great. Thank you, Nathan, and thanks for [2:28] all your work uh on tonight's meeting. [2:32] Um you kind of keeping us going from a [2:34] technology perspective. Um if you have [2:37] any kind of technical questions, you can [2:40] also throw them Nathan's way. Um tonight [2:43] we're we're joined uh we have a lot of [2:46] information to share as you can well [2:48] imagine if you looked at the engage page [2:49] and saw the reports. Um, we're start [2:53] we're going to start with uh Christina [2:54] Carbury who is our protective services [2:57] manager and then uh Carara Xanberen our [3:01] uh flood and mitigation and water [3:03] project supervisor in our engineering [3:04] department and Karen Mloud our planning [3:08] manager from our planning and [3:09] development uh department. And then [3:11] during the Q&A, we're going to be um [3:14] also supported by consultants who worked [3:16] on the reports. Uh Beatrice Kalipadia um [3:20] geological engineer for BGC engineering [3:23] and Tamson Mills, a senior planner for [3:25] Pina sustainability. Um I encourage you [3:28] to put your questions in to the Q&A as [3:32] we uh as we go through the presentation [3:35] and um as you can see there is the [3:37] agenda. So without any further ado, [3:40] we'll get started with understanding [3:42] hazard risk and uh Christina. [3:49] » Uh great. Thank you, Director Club. Uh [3:52] so good evening everyone. Uh my name is [3:54] Christina Carbury. I'm the protective [3:56] services manager for the regional [3:57] district and I'm responsible for [3:59] emergency management and rural fire [4:01] services within the regional district. [4:03] Uh so this evening we're going to spend [4:05] some time talking about hazard and risk. [4:07] And when we talk about hazard, what [4:09] we're talking about is actually the [4:10] natural processes themselves. So that [4:13] would be things like steep creeks and [4:15] heavy rainfall and the potential for [4:16] debris to move downhill. When we're [4:18] talking about risk, we're talking about [4:20] who and what might possibly be in harm's [4:22] way and how severe the impact could be. [4:25] Um both are key in how we plan and how [4:27] we respond. Next slide. [4:34] So, uh, hazard is the event and risk is [4:37] the impact. The hazard doesn't change. [4:40] Fairmont Creek will always have the [4:42] potential for debris flows, but our risk [4:44] changes depending on where people live, [4:46] how properties are designed, and what [4:48] systems we have in place for warning and [4:50] response. [4:52] Risk impact to put it into perspective [4:54] is the effect that a debris flow could [4:56] have on you, your neighbors, your homes, [4:59] properties, and businesses, which [5:01] essentially means life safety, [5:03] structural damages, and economic losses, [5:05] uh, such as income. [5:08] Risk can be a challenging thing to put [5:09] into a relatable context. So, I'll give [5:11] you a couple of examples here, but [5:12] you're going to hear many examples [5:14] throughout the evening. [sighs] [5:16] So for a 1 in300 [5:18] uh debris flow would be similar to [5:21] having a 0.3% chance of it happening [5:23] each year. So what that means in an [5:26] easier context would be over 25 years uh [5:29] the time uh the time many people will [5:31] come uh sorry the time many people live [5:34] in a home that adds up to roughly an 8% [5:36] chance. Uh that's roughly the same odds [5:39] as your car needing a major repair at [5:41] least once over 25 years. It's not a [5:43] guarantee, but it is absolutely [5:45] realistic. [5:46] Now, looking at something like a 1 in [5:49] 1,000-year debris flow, uh that would be [5:52] similar to a 0.1% chance per year. So, [5:55] over 25 years, that becomes roughly a [5:57] 2.5% chance. And that would be [5:59] comparable to the chance of your airline [6:01] losing your luggage at least once in [6:03] your lifetime. It's unlikely, but it [6:05] does happen. Next slide. [6:10] So when hazards become emergencies, uh [6:13] when a known hazard turns into an active [6:15] event, our job is to translate that risk [6:17] information into action. Uh the [6:19] protective services department leads [6:21] evacuations, coordinates emergency [6:23] response, manages debris removal in [6:25] coordination with our flood response [6:26] team, and navigates provincial funding [6:28] programs to support recovery. When the [6:31] hazard is known, the province expects [6:33] local governments to plan for it through [6:35] land use decisions, emergency plans, and [6:37] risk reduction strategies. Understanding [6:40] where the hazard exists and who is most [6:42] at risk allows us to pre-plan routes, [6:44] resources, and staging areas so we can [6:46] respond quickly and safely when an event [6:48] occurs. Next slide. [6:54] So uh ensuring [6:56] um ensuring we meet provincial [6:58] expectations for managing known hazards [7:00] includes implementing mitigation or risk [7:02] reduction measures where feasible, [7:05] maintaining emergency plans that address [7:07] the identified hazard. So in this case, [7:09] debris flows and demonstrating due [7:11] diligence in land use decisions and [7:13] public safety. [7:14] Next slide. [7:18] So building resilience in Fairmont. Our [7:20] goal isn't to eliminate hazards. That is [7:22] not possible, especially in a mountain [7:24] environment. Uh but to reduce risk by [7:27] understanding where those hazards are [7:28] and planning accordingly. Uh every level [7:32] of awareness and preparation makes a [7:34] difference. And I will pass things over [7:36] to Cara now. [7:41] Thanks, Christina. [7:43] So, as part of building resilience in [7:46] the community of Fairmont, construction [7:47] of the Cold Spring Creek debris flow [7:51] mitigation structure was completed this [7:52] year. [7:54] A residual hazard map was completed [7:56] after the construction, which [7:57] incorporates the basin and barrier. This [8:00] residual mapping shows how the [8:01] structures mitigated risk in the [8:02] community and where the risk is still [8:04] slightly elevated. So, the structure [8:06] will hold up to an estimated 84,000 [8:09] cubic meters of debris flow material. [8:12] These frequency magnitude values on the [8:14] slide [8:15] um are the return periods and est these [8:17] are the return periods and associated [8:19] volumes. These were determinate [8:21] determined in the 2020 hazard assessment [8:23] and this was what we were these are the [8:25] values and numbers that we were using [8:27] when we were designing the structure. [8:30] So at 84,000 cubes this will hold up to [8:33] the 300 to 1,000 year event. [8:37] Once we go past that, so in the thousand [8:38] to 3,000 year event, there's still [8:40] 12,000 cubic meters of material more [8:42] than the structure can contain. So this [8:45] excess volume at the estimated discharge [8:47] rate [8:49] would be this is the hazard that creates [8:51] a residual risk. Next slide, please. [9:01] Can we move to the next slide, please? [9:03] Thanks. [9:06] So for comparison purposes, this is a [9:08] premitigation debris flow risk map. The [9:10] very high and high-risisk zones are [9:12] indicated by brown and red. And a large [9:14] number of res residences were included [9:17] in these zones when we started. Next [9:19] slide, please. [9:23] And this is our post mitigation risk [9:25] map. The only very high zone remaining [9:27] is upstream of the barrier. And there's [9:30] a small strip of high and moderate risk [9:32] zones immediately downstream of the [9:33] barrier. [9:34] There are no longer any residences or [9:36] businesses located in the moderate high [9:38] or very high risk zones. [9:43] Next slide, please. And that is all we [9:45] have for the Cold Spring Creek. Moving [9:48] on, I'm sure everyone here is aware the [9:50] other creek in the community with debris [9:52] flow concerns is Fairmont Creek. [9:54] Fairmont Creek experienced a significant [9:56] debris flow event in 2012. As part of [9:58] the reaction to this event, the RDK had [10:01] a hazard and risk assessment completed [10:02] for the creek. And this assess this [10:04] assessment which was completed in 2013 [10:06] is what was used for the planning and [10:08] design of the mitigation works that have [10:09] been completed on the creek to date. [10:13] This report is now 12 years old and [10:15] since the creek has been very active and [10:17] some mitigation has been constructed, it [10:19] was prudent to update the report. So [10:21] this updated report incorporates the [10:23] mitigation on the creek. It includes [10:25] data from the multiple debris flow [10:26] events that have occurred since the last [10:28] report and it uses updated modeling [10:30] techniques and changes to how climate [10:32] change and wildfire impacts are [10:34] considered. This report was funded by [10:37] the UBCM community preparedness fund and [10:39] it was completed by BGC Engineering. [10:42] Next slide please. [10:47] So before we talk about the up outcomes [10:49] of the updated mapping, I wanted to [10:51] review some of the terminology that [10:52] you'll see and one big one is the [10:55] distinction between debris floods and [10:56] debris flows. So we see both of these [10:58] processes on both of the creeks in [11:00] Fairmont and they are related but there [11:02] are some important differences. [11:05] So a debris flood occurs when we have [11:07] large volumes of flow in the creek or [11:09] river and gravel, cobbles and boulders [11:12] are picked up and entrained in the flow. [11:15] It behaves more like water and it can [11:17] still move really large volumes of [11:18] debris, but there's generally lower peak [11:21] discharges than debris flows. So we're [11:22] getting um so the impacts are not quite [11:25] as quite as um powerful. [11:29] With debris flows, we have higher [11:31] sediment concentrations than in debris [11:33] floods. It behaves more like a wet [11:35] concrete and it's typically faster. [11:37] They're typically faster than debris [11:39] floods and they have higher peak [11:40] discharges and impact forces. Typically, [11:42] they are more dangerous. [11:45] Next slide, please. [11:50] So now we'll move into one of the key [11:52] outputs of the report which is the [11:54] frequency magnitude values. So frequency [11:57] of course is how often the event is [12:00] likely to occur and the uh the volume is [12:04] obviously the estimated size. So on cold [12:09] on Fairmont Creek [12:12] similar to Cold Spring Creek up until [12:13] about the 100year return period event [12:16] the event is likely to be a debris [12:17] flood. [12:19] So in the 10 to 20 year return period we [12:21] can expect a volume of about 9,000 cubes [12:23] and 30 to 100 year about 28,000. [12:27] So [cough and clears throat] [12:29] from about the 100year period onwards [12:31] the events likely to be debris flow with [12:34] significantly higher volumes. [12:38] And you can see with the some of the [12:40] numbers here the peak discharges for the [12:41] debris flood are significant [12:43] significantly lower [clears throat] than [12:44] they are for debris flows. same as they [12:47] are with the volumes. So to show how [12:50] some of um our like more recent events [12:53] fit into this table in 2020 the volume [12:56] of debris that was mobilized from above [12:57] the weers in Fairmont Creek was about [13:00] 20,000 cubic meters. [13:03] So at that time the return period [13:05] estimated by NHC who was our consultant [13:07] that looked at looked at the creek right [13:09] after the event they estimated the [13:11] period was about 35 years. So, this [13:13] doesn't fit exactly into the table, but [13:15] pretty closely fits into our 30 to [13:18] 100year return period for debris floods. [13:22] The 2012 event had an estimated volume [13:24] of about 65,000 cubic meters. So, this [13:28] was estimated by Clark in 2013. [13:32] Um, at the time they felt that that was [13:35] a period of maybe roughly 475 [13:38] year return period. But after the 2020 [13:42] event occurred, NHC updated this return [13:44] period to be an estimated 165 years. So [13:48] this again it doesn't fit exactly into [13:50] what we have here, but relatively [13:52] closely into the 100 to to 300year [13:55] return period event. And this change in [13:57] the estimated return period is due to [13:59] the additional information from the more [14:01] recent event. [14:03] Next slide, please. [14:11] So the mapping that we're going to look [14:13] at next shows hazard zones that are [14:15] based on the hazard which is determined [14:17] from topography data interpretation [14:19] modeling and then the risk index which [14:22] is calculated using um a risk equation. [14:25] So risk again is the probability of the [14:28] hazard occurring and then the [14:29] consequences of it occurring. [14:33] So just to give a bit of background on [14:37] risk, the risk equation considers the [14:40] hazard probability which is of course [14:42] the annual probability that the event [14:44] will occur and then it considers spatial [14:46] probability which means so in if an [14:49] event of a certain magnitude occurs [14:51] what's the likelihood of a certain [14:53] location being impacted by it. It [14:57] considers the temporal probability. So [15:01] that means what's the likelihood of a [15:03] person being in that location when the [15:05] event occurs. [15:08] It considers exposure. So exposure is [15:10] the number of people or the value of the [15:12] elements at risk in that location. And [15:15] then the vulnerability. So that is the [15:17] likelihood of a fatality [15:20] should that person be impacted at that [15:22] location. So this equation gives us our [15:25] individual risk and that is that that is [15:28] the PDI that you see on the table and [15:30] that stands for the probability of death [15:32] of an individual. [15:34] We also considered in the report the [15:36] group risk. So that's the estimated [15:38] number of fatalities should a certain [15:40] hazard occur and we looked at economic [15:42] risk. [15:46] So the hazard zones shown in this table [15:49] align with risk tolerance criteria that [15:51] other municipalities are using um such [15:53] as Canmore, North Vancouver, Squamish [15:55] and this risk is generally considered to [15:57] be unacceptable [16:00] um in a community if the risk of death [16:02] of an individual is greater than 1 to [16:03] 10,000. So this corresponds to the high [16:06] and very high zones. [16:09] Next next page please. [16:14] So, [16:16] this is one of the uh one of the key [16:18] outputs of the assessment and it's it's [16:21] a really great visual. So, I'll just I [16:24] thought I would have this one up while I [16:26] talked about some of the hazard zones. [16:29] So, when you're looking at this map, the [16:31] yellow zone is the is a low hazard zone. [16:36] So, in the yellow zone, we're look the [16:38] risk index is less than 1 to 100,000. [16:42] So that is roughly equivalent to your [16:45] risk of drowning in a bathtub. [16:47] The moderate zone, and this is the [16:49] orange zone, is in the 1 to 10,000 [16:53] to 1 to 100,000 range. And that's [16:57] comparable to your risk of um dying [17:00] [clears throat] from gun violence in the [17:01] US or from general anesthesia in an [17:06] operation. [17:08] Now the high zone, this is the red zone. [17:12] Um that is the 1 to 10,000 to 1 to 1,000 [17:20] risk of risk of death and that is [17:24] comparable to CO 19 in 2020 or a car [17:27] accident. [17:29] and then the very high zone and that is [17:31] greater than 1 to 1,000 [17:34] that is comparable to dying the 40th [17:38] year of life in the USA from any cause. [17:43] So the shape this map is much more [17:45] detailed than we've seen in the past [17:47] from from our last our last assessment [17:50] but the shape of it is not remarkably [17:52] different. [17:53] There are however a number of properties [17:56] uh remaining that are still in the high [17:57] and very high hazard zones. [18:01] Next slide please. [18:07] So the final part of this report was to [18:09] identify some potential options to be [18:11] considered for future debris flow [18:12] mitigation and to estimate the costs. So [18:16] several factors were considered in the [18:18] development of the options and some of [18:20] these included the degree of risk [18:22] reduction that could be achieved um risk [18:25] transfer. So that would be um [18:30] you know assuming we can mitigate the [18:32] risk at one location but the cost of [18:34] that was that a downstream location [18:38] would see higher risk. Um the location [18:41] of a potential [18:44] potential mitigation uh the land [18:46] ownership at that location future [18:48] maintenance costs capital costs public [18:51] impacts and the possibility of phasing. [18:55] So at this point we have five options [18:58] identified. They're not all standalone [19:01] options. They mitigate in different [19:02] ways. So it may make sense to combine [19:04] two or more of these options as we look [19:06] further into it. So very briefly, option [19:10] number one would be a large debris [19:13] barrier and basin, not unlike what we [19:15] have on Cold Spring. Um and I know my [19:18] map is is a little small up here, but [19:20] that would be the number one option and [19:23] it's right at the very top of the map. [19:26] So that could potentially contain on the [19:30] order of 60,000 cubic meters. So it does [19:33] come close to mitigating um a good [19:36] portion of the risk. [19:38] It does come at a very high cost. And [19:40] these costs are order of magnitude. They [19:42] are very very rough, but they do give us [19:45] an idea of what we could um be looking [19:48] at when we're just thinking of what way [19:50] we might want to go when we're thinking [19:52] about options. [19:54] Option number two is down, excuse me, is [19:58] down on the golf course and that is a [20:01] parallel parallel Burman basin. Um, that [20:05] would contain less. It also costs a lot [20:08] less. Um, [20:10] there are different challenges with it. [20:13] Um, [20:15] it's all in private land. Um, it's right [20:17] in the middle of community. It's [20:18] definitely none of these options are [20:19] ideal, but that it it does remain a [20:22] viable option that we'd like to, you [20:24] know, look at a little bit more. [20:27] Um, [20:28] the third option is downstream. So, that [20:32] is [20:33] on the lower part of the map. That's the [20:35] number three and that's where the creek [20:37] flows through the community downstream [20:39] of the golf course pond. [20:42] Um [20:44] we're cons we're at in this location [20:48] channel improvements are being [20:49] considered. Uh it is a very small creek [20:52] channel at the time. Um this would [20:54] include looking at the culverts and the [20:58] various ways it flows through the [21:00] community. Um could include BMS, it [21:03] could include armoring. The cost [21:05] estimate is very broad um because [21:08] [clears throat] there are so many [21:09] different ways we could go with this [21:10] option. [21:13] Option number four, this is a smaller, [21:15] more localized [21:17] um [21:19] potential mitigation. So [clears throat] [21:20] that is towards the upper part of the [21:23] map or and that is the the road crossing [21:28] just downstream of where our wheels are [21:30] located um where the road goes into the [21:32] campground. [21:34] And [21:36] armoring this would um greatly [21:41] greatly reduce the chance of that road [21:42] being washed out in a large event. And [21:46] that's important for emergency access, [21:48] for ingress, egress, etc. The final [21:51] option, number five, it's right in the [21:54] middle of our map. So that would be an [21:56] armored burm, and that's right in front [21:58] of the Marble Canyon town homes. Um, [22:02] they're extremely vulnerable. Be as [22:05] close as they are to the creek. uh [22:07] building up a larger BM would not only [22:09] protect those homes, but it would keep [22:10] um it would keep the flow in the channel [22:14] at that location and uh easier to [22:16] control downstream. [22:20] Next slide, please. [22:25] So, this report was just a first step in [22:28] moving towards a potential future [22:31] project on Fairmont Creek if that ends [22:34] up happening. Um the next step will be [22:36] to complete a detailed options analysis [22:38] for all of these options that we've [22:41] discussed and considered. And this [22:43] options analysis would include more [22:46] detailed analysis of the costs, [22:47] feasibility, risks, and community needs [22:50] and wants. And a really critical [22:53] component of this next step will be [22:54] engagement with all stakeholders [22:56] including community members, businesses, [22:58] first nations, and other levels of [23:00] government. [23:02] We'll be seeking funding opportunities [23:03] for this next step and moving beyond [23:07] that next step, should that be the [23:09] decision that we go with, um we'll be [23:11] looking at additional funding [23:12] opportunities for potential future [23:14] construction projects that come out of [23:16] this options analysis. [23:19] Thank you. And moving on to Karen. [23:27] Thank you, Cara. So I'm going to speak [23:29] to a bit about the planning side of [23:31] things and about the guidance report [23:33] that we had done by BGC Engineering and [23:36] Pina Sustainability. [23:39] So right now um we have an official [23:42] community plan for Fairmont Hot Springs [23:44] and Colombia Lake area and that OCP was [23:48] done around the time of the 2013 event. [23:52] Um and right now the policies and the [23:55] direction with respect to hazards are [23:58] quite generic and they're not very [24:00] specific. Um how we've been dealing [24:03] largely um with um the debris risk or an [24:08] assessments have been on a sightspecific [24:10] basis through the building permit [24:12] process. So at this point um based on [24:15] the the previous mapping for both the [24:17] creeks uh the building inspector has [24:20] been doing an independent assessment at [24:22] each building permit stage to determine [24:25] what level of reporting or what type of [24:28] qualified professional report might be [24:31] required in order to consider if there [24:34] should be sightsp specific engineering [24:37] considerations um to ensure that [24:40] whatever is being built would be a safe [24:42] built. [24:43] So what the guidance report was intended [24:46] to do is to provide information and to [24:49] be proactively thinking ahead in terms [24:52] of how we can move away from our current [24:54] model which is reliant on a specific [24:57] section section 56 of the community [25:00] charter uh to ensure that property [25:02] owners are informed about the risks um [25:05] relative to building on their property [25:08] and ensure that this uh building that is [25:11] being built is safe for the intended use [25:14] of occupancy. Uh to be moving forward to [25:17] having an official community plan that [25:20] includes relevant current policies with [25:23] respect to land use policies. Uh so [25:26] that's going to be land use conservation [25:28] or change if people are looking to [25:30] change the use of planning. [25:33] whether or not there should be changes [25:34] to our zoning bylaw, whether there [25:36] should be changes that are reflective of [25:38] the outcomes of these two reports to our [25:41] flood plane management bylaw. And most [25:44] importantly, that there would be [25:46] opportunities to proactively have [25:48] information for property owners and the [25:51] regional district so that everyone has [25:53] an understanding of how these reports [25:55] that have been prepared relate to um [25:59] individual properties and how they can [26:01] safely be used and built. So what the [26:04] intent of the guidance report were were [26:07] three-fold. It was to have a chance to [26:09] review the hazard mapping for both [26:11] creeks. um with that reporting that was [26:14] just completed this fall and has just [26:16] been presented by Carara. Um it has a [26:20] framework analysis and this is options [26:22] on how to consider the updated hazard [26:24] mapping for both creeks. So um there [26:28] report looks at different frameworks. Um [26:31] Cara spoke to that um when she had the [26:34] table that discussed the probabilities [26:37] um and that's how the zones relate to um [26:40] what the level of risk is and so the [26:43] framework looks at the three options um [26:46] that were available for the regional [26:47] district to consider as we move forward [26:49] and makes a recommendation. [26:52] So there are four interimm policy [26:54] recommendations that were made by BGC [26:57] Engineering and Penis Sustainability and [26:59] I'll just walk through each of those [27:00] four at a very high level. [27:09] The first is a recommendation that there [27:12] needs to be official community plan [27:13] amendments. So, as you can see in the [27:16] little snip from schedule I of the [27:19] current official community plan that [27:21] I've included on this slide, when the [27:23] mapping for the hazard um was done with [27:26] this OCP, when it was originally done, [27:29] it very generically just identified that [27:32] there was a hazard. So, it's not [27:34] specific in terms of whether it's a [27:36] debris flood, it's a debris flow, um [27:39] what type of hazard it is, and it isn't [27:42] generally really reflective of the scope [27:45] or scale that's reflected by the fact [27:48] that there's different zones or [27:49] intensity of risk related to the [27:52] hazards. Um the way that the mapping is [27:55] done is it basically just follows the [27:58] general uh creek barriers or the creek [28:02] dispersal areas. um or the broader river [28:05] Columbia River flood plane. Uh so we [28:08] would be looking at having new mapping [28:10] that aligns with the new data that came [28:12] out of both the reports for both Cold [28:15] Spring Creek and for Fairmont Creek. We [28:18] would also be looking to integrate [28:20] amendments that would recognize the [28:23] other recommendations that are being [28:25] made um within this report. So that [28:28] would reflect integrating the risk [28:30] tolerance policy that would be [28:32] considered the hazard zones and [28:33] development approval policies. [28:38] So that takes us to recommendation [28:40] number two which is that the RDK should [28:43] adopt a formal risk tolerance policy. Uh [28:47] so this is as Cara discussed is a [28:51] relatively standard procedure for many [28:53] municipalities um in BC and Alberta. And [28:57] so these are being done by communities [28:59] that have experienced events similar to [29:02] the regional district and it creates a [29:05] baseline um that provides direction in [29:08] terms of where new development should be [29:11] supported um based on those ratings and [29:14] where um renovation or changes to [29:19] existing development um is acceptable [29:22] levels of risk. Uh so the report [29:26] identifies that it can either be a [29:28] standalone policy or it can be OCP [29:32] specific. So at this time um we would [29:35] think that it would be something that we [29:37] would look to have their RDK adopt on an [29:40] RDK-wide basis. Um but we'll see how [29:43] that works. So it would include a risk [29:46] tolerance criteria or risk index. So [29:49] that would be um reflective of the two [29:52] tables that Cara showed um that have it [29:54] ranked based on the hazard zones. So the [29:58] recommendation that came out of this [30:00] report was that a combined hazard risk [30:02] framework be applied for the regional [30:04] district and this echoes a decision of [30:08] the board made earlier in the year where [30:11] they considered some preliminary [30:13] information and provided some direction [30:15] to staff and the consultant in their [30:17] preparation of the report. [30:23] Recommendation number three is that [30:26] development permit areas that recognize [30:29] the debris flow hazard should be [30:31] integrated into the official community [30:33] plan. The official community plan [30:36] currently does not have a hazard [30:38] development permit area. What a hazard [30:41] development permit area allows is the [30:44] segmentation of the parcels um within [30:48] the hazard zones to be identified to [30:50] have different guidelines that are [30:52] required. So again, this very much [30:54] becomes a public education piece in [30:57] terms of that people can understand [31:00] based on their hazard zones and the [31:03] corresponding guidelines within the [31:05] development permit area. They can [31:07] understand what they can or could not do [31:11] based on having a qualified expert [31:14] opinion if required that what they can [31:17] do to ensure that the there is safe [31:20] build on their property. [31:24] Uh so one of the key things that the [31:27] report did identify though is that [31:30] structural mitigation at the community [31:32] level which might be that much more [31:35] expensive or higher level of mitigation [31:37] that Cara identified shouldn't be [31:39] considered to facilitate or enable [31:41] higher level densities. So that means [31:44] that um that should all be taken into [31:47] consideration um when we're identifying [31:50] the guidelines um that would go into the [31:53] development permit areas um should a [31:55] development permit uh process be [31:58] implemented within the official [31:59] community plan. [32:02] The last recommendation of the report [32:04] was that there should be specific [32:07] development policies integrated into the [32:09] official community plan. So this really [32:12] relates to the fact that people need to [32:14] understand what the different four [32:16] hazard zones means and [32:20] how that should apply on a parcel [32:22] specific basis. So this would also [32:26] include identification of when sight [32:28] specific risk assessments would be [32:30] required and it should be aligned with [32:34] the adopted risk tolerance policy that [32:37] would be this is an action that would [32:39] have to be completed by the regional [32:41] district and be adopted by the regional [32:43] district board and it would provide [32:46] clarity with respect to future land uses [32:49] based on the identified hazard zone. Um [32:52] so based on the risk and hazard the very [32:55] high hazard um residual hazard zones for [32:59] example are would not be generally [33:02] anticipated to be supported for [33:04] residential development or types of uses [33:08] that would include structures. So they [33:11] may be more suited to passive recreation [33:13] or park use. Uh so those are the types [33:16] of policies that we would anticipate [33:19] would be integrated into official [33:21] community plan and the guidance report [33:24] provides um some very high level [33:27] information um with respect to that and [33:30] as the implementation [33:33] of the guidance report and consideration [33:37] of the two reports prepared for the [33:39] engineering department unfold. um the [33:42] the specifics of that would be something [33:44] that would be looked at and that there [33:46] would be community consultation. [33:49] So more specifically [33:51] the implementation of the interimm [33:54] policy recommendations are going to [33:56] require the dedication of RDK staff [33:59] resources and we anticipate this would [34:02] be across multiple departments. So, [34:05] similar to how uh we have four [34:08] departments represented here tonight, um [34:11] we anticipate to see this through um [34:13] we're going to be needing to work [34:15] together uh to ensure that the various [34:17] expertise, knowledge and all those [34:20] pieces can come together um to ensure [34:23] that we can be successful moving ahead. [34:26] Um one of the key things that we want to [34:29] move forward with first is board [34:31] consideration of the risk tolerance [34:33] policy. um because this is a keystone um [34:36] for moving forward with what the other [34:38] parts of the puzzle look like with [34:41] respect to whether we have specific OCP [34:45] policies, what framework we're working [34:47] forward and all those different pieces. [34:49] um we we feel like that's the one piece [34:52] we need first [34:56] and then most importantly uh one of the [34:58] key things about implementation is going [35:01] to be that there will be community [35:03] consultation and engagement. Uh so [35:05] similar to as Cara just spoke to, there [35:08] are a range of stakeholders um that the [35:11] regional district will need to and will [35:13] want to engage as we move forward um in [35:17] with respect to ensuring that um members [35:20] of the community have the information [35:22] that they need um in order to be able to [35:27] contribute to the processes that we're [35:29] going to be engaging. [35:32] So just a quick summary of the next [35:38] steps recognizing that we have three [35:41] different reports um and we've had three [35:43] different speakers um just I'll give a a [35:47] really quick summary here and so the [35:50] next steps for each of the different [35:52] pieces uh for Cold Spring Creek um [35:55] really the project has wrapped up with [35:57] the construction um now being completed. [36:00] So, one of the key items is discussion [36:02] with the province on ongoing funding [36:05] support for the debris removal for [36:08] Fairmont Creek. As Cara identified, um [36:11] there needs to be mitigation option [36:13] analysis and stakeholder engagement [36:17] and very importantly there needs to be [36:19] investigation of funding sources for [36:21] that both that options analysis and for [36:24] potential future construction. um none [36:27] of the proposals or for the potential [36:32] mitigation options um were something [36:34] that are um low dollar u value. And for [36:39] the guidance report as I just mentioned [36:41] um the first thing that we would like to [36:44] embark on um is the development and [36:46] adoption of an RDKwide risk tolerance [36:49] policy as this will set the groundwork [36:52] for us to be able to move forward with [36:54] the other pieces and the other updates. [36:58] So, we are all here and recognize that [37:01] it's a lot of information and that um [37:06] you may not have questions specifically [37:09] um but we are here um to answer them um [37:13] and we have kind of we have expertise [37:15] for the three different areas and so [37:18] that if you wanted to take advantage of [37:21] um having us here today um you can input [37:24] the question into the Q&A Okay. [37:28] So, Nathan. [37:30] » Yeah. Thanks, Karen. Um, I will start [37:32] with reading the questions that we did [37:34] receive on the engage page. Um, and then [37:37] after we've gone through those, then [37:38] we'll move on to the Q&A questions that [37:41] have been asked during this meeting or [37:43] this webinar here. Okay. Um, so sorry. [37:45] Um, the first question on the engage [37:48] page is on the Fair on the Fairmont [37:52] Creek map, the high zone reaches the [37:54] Columbia River. Has there been any [37:57] modeling to determine the risks or [37:59] potential impact up and or downstream? [38:11] » Uh [38:12] Beatus, could you answer that one? [38:14] » Yeah, absolutely. Uh yeah, so we didn't [38:18] specifically look at um the impacts to [38:21] the Columbia River in this scope of [38:23] work, but uh if we kind of look at the [38:27] 2012 event, we know that sediment could [38:29] reach the river similar to that event. [38:32] uh and a separate study would need to be [38:34] done to look at the capacity um for the [38:38] Columbia River to take away the sediment [38:40] um in 2012, which is kind of as Cara [38:43] said, similar to what we'd expect in a [38:45] 100 to 300year event. Uh it didn't block [38:48] the river. Um and I believe the sediment [38:52] was mostly carried away naturally. Um, [38:55] so that's kind of gives you a scale uh [38:58] an idea of what could happen in the [39:01] future. But with a larger event, we [39:03] would probably expect more sediment to [39:05] reach the river, but we did not study it [39:08] quantitatively. No. [39:13] » Great. Um, I will move on to the next [39:15] question from the engage page. Uh, how [39:18] can the community members communicate to [39:20] the RDK that we do not want to pay for [39:22] any further exper [39:28] mitigation? [39:38] Um, I'll take that. there, as we've um [39:43] as we've noted a couple times in this [39:45] presentation, um there will definitely [39:48] be opportunities for future engagement [39:51] with the community and you'll have the [39:54] opportunity opportunity to uh let us [39:56] know how you feel at that time. [40:03] Okay. Um and then the next question from [40:05] the engage page. If the Fairmont [40:08] guidance report is to guide future [40:10] development, why are the developers not [40:12] paying for these studies and flood [40:14] mitigation projects? [40:24] Uh I'll speak a little bit to the who [40:26] paid for the project. Um the guidance [40:29] report um was funded I think it was [40:33] about 93% by UBCM which is the union of [40:37] BC municipalities grant program um and [40:41] the remaining 7% was paid for through [40:43] the planning function which means it was [40:46] not specific to the service area paying [40:49] for that remaining funds that were [40:51] required to be um inind type [40:54] contributions. um they were p paid for [40:57] actually through the entire planning [40:59] function which is uh funded both through [41:01] the municipalities and all of the [41:04] taxpayers within the electoral areas. Um [41:07] so that was for that report and then the [41:10] um some of funding as well came through [41:13] that UBCM funding program [41:17] and then I'm not sure if Cara wanted to [41:19] speak to the other piece. [41:22] » Yeah, I can do that. Um I guess the the [41:25] short answer really is that [41:29] the reason [41:31] the reason that we did any mitigation is [41:34] for the existing community. Um [41:37] if there wasn't a community there, if it [41:40] was only if it was only for future [41:42] development, [41:45] the project would not have happened. [41:50] Um, and I guess I'll I'll add a little [41:52] bit to that. There are places in the [41:54] province where barriers are being built [41:57] um, much larger than this. And in those [42:00] cases, they are being paid for by the [42:02] developer. [42:11] Okay. Um, so the next question is, will [42:13] any future mitigation projects be voted [42:16] on by the community? [42:28] do I can take this one if if you want. [42:32] Um I I think in this uh at this point as [42:37] we move forward in through the process [42:39] we're not at that stage. uh what's [42:42] determined in the next steps. There will [42:45] be public consultation [42:47] and that would be certainly would be the [42:50] intention to get the feedback from the [42:51] community to discuss what the options [42:54] are. Um and that that's how we'll that's [42:57] how what our intention is to move [42:58] forward. [43:07] Okay. Um, sorry, juggling a couple [43:10] screens here at the moment. Um, so the [43:13] next comment from the engage page, um, [43:16] thank you for your efforts to support [43:18] hazard and risk mitigation on Cold [43:20] Spring and Fairmont Creek. The Fairmont [43:22] Creek footpath from the mountainside [43:25] golf course to the Fairmont Hotring [43:27] Lodge area has remained closed since the [43:30] landslide in 2012. Despite the trail [43:33] closure, many people still use the trail [43:35] to access the waterfall. Along the foot [43:37] path below the Fairmont Hot Springs [43:39] pools, there is an exposed black pipe [43:42] along the creek bed. There's also a [43:44] broken white pipe. These pipes have been [43:46] exposed since the landslide in 2012. [43:49] Over the past year, there have been [43:51] concerns from the community regarding [43:53] the state of the potable water [43:54] infrastructure. [43:57] Please advise the purpose of these pipes [43:59] and the status of the trail restoration [44:01] efforts. [44:05] Yeah, I can take that. Um, so these [44:07] pipes [44:09] are Fman Hot Springs infrastructure and [44:13] they are for irrigation, [44:15] not for potable water. [44:18] As far as restoring the trail, that is [44:22] all private land um owned by the resort. [44:26] And it wouldn't be because it's not [44:29] really a flood, it's not a flood [44:30] mitigation type project. um that would [44:32] fall on the resort to uh repair. [44:39] » All right. Um if the debris flow were to [44:41] cross and block the highway, would that [44:44] not be a provincial or federal [44:45] jurisdiction? Why then is our LSA the [44:49] only ones paying for the dam? [45:03] Uh the capital costs of the dam were 98 [45:07] 99% covered by provincial and federal [45:10] funding. [45:12] So they have uh contributed greatly to [45:15] the cost of the structure and [45:17] mitigation. [45:21] Christina, could you speak to the role [45:23] of the RDK as the local responsible [45:27] local authority in cases of emergency [45:30] management? [45:32] » Yeah. Uh so I mean if a if we had a [45:35] debris flow that impacted the community [45:37] as well as the highway, there is a lot [45:39] of coordinated efforts between uh [45:42] various agencies, the RDK itself, um the [45:44] Ministry of Transportation if the [45:46] highway was impacted. uh and there is a [45:48] concerted effort to you know clean [45:50] things up as quickly as possible uh look [45:53] through or activate funding through the [45:55] province and whatnot. Um but yeah it [45:59] it's [46:01] it's a complicated and uh coordinated [46:04] effort when we have a big event. [46:12] » Okay. Um, so the next question, the RDEK [46:15] was presented with a petition at the [46:17] grand opening of the dam in October. [46:20] Rather than address the serious and [46:21] numerous concerns raised in it, a short [46:24] response was provided advising to [46:26] contact the ombbuds person. Why did the [46:28] RDK choose to dismiss the concerns and [46:31] pass the responsibility off on it? [46:36] » Certainly, I can speak to that. I don't [46:38] think the RDK chose to dismiss the [46:41] concern. was actually quite the [46:42] opposite. the the the [46:46] uh petition as I understood it was [46:49] asking that a complete review be done [46:53] and that is the role of the umpids [46:55] person's office is to complete those [46:58] types of re reviews as a uh impartial [47:02] and third party to make sure that any [47:05] there was nothing done incorrectly or [47:07] against policy or out of outside of the [47:10] public interest. So it is the [47:12] appropriate vehicle for uh for the the [47:16] request that was in the petition. [47:25] Okay. Um how was the guidance project [47:28] and updated hazard and risk assessment [47:30] been funded to date? How will the [47:33] implementation of the recommendations be [47:35] funded? [47:42] So the guidance project as I mentioned [47:44] was primarily funded through UBCM uh [47:47] funding program and that was through a [47:50] disaster um recovery and climate u [47:54] mitigation stream. Um some of the [47:58] preliminary work will be covered through [48:01] the planning function [48:03] and beyond that uh similar to Kara uh [48:08] the regional district will be [48:10] investigating additional uh grant [48:13] funding streams um where it is [48:16] identified that there is um expertise or [48:19] guidance um that is required that is [48:22] outside of the scope and capability or [48:25] qualific ifications of RDK staff. Um so [48:28] it's going to be a bit of a mix um with [48:32] respect to it being paid through um [48:35] existing um regional districtwide [48:39] services um instead of just being born [48:41] by the local service area and grant [48:44] funding as the different um [48:47] opportunities or requirements come [48:50] about. [48:55] Okay. Um, and will any of the costs of [48:58] these reports, RDK staff hours, [49:02] administration input, and subsequent [49:04] meetings be borne by a new or the [49:07] existing Fairmont Flood and Landslide [49:09] Service Area Fund. [49:22] I say generally speaking, um I'd say [49:25] kind of what I just said for the [49:27] previous response. Um the majority of [49:30] the staff hours and administration is [49:33] getting covered through um existing um [49:36] regional districtwide service um [49:39] taxation. Um the local service area is [49:43] very specific with respect to uh what [49:46] the funds generated from that local [49:48] service area are eligible to cover. Um [49:51] it is a small service area. It has [49:53] limited taxation available. Um so where [49:56] it is feasible um it is covered through [49:59] those broader taxation [50:02] um considerations and services. [50:10] Okay. And this is the last question from [50:13] the engage page and then we will move [50:14] over to the Q&A section. Um, at several [50:18] recent public meetings and forums hosted [50:20] by the RDK, it has been noted that the [50:23] time period for public input and [50:24] questions was insufficient. Will this be [50:27] addressed at this and future meetings [50:29] going forward? [50:36] Yes, that would be an area that we would [50:39] look for direct feedback and potentially [50:42] some guidance on. Um if there is a [50:45] feeling from the community that you [50:47] aren't being given enough time um then [50:50] that should be articulated to the [50:52] project managers um specific to the [50:55] different pieces as we move forward and [50:58] then where it is practicable [51:01] um that those can be worked into the the [51:03] work plan um and that can be considered [51:06] moving forward. [51:11] » Okay. Um, I'm going to move over to the [51:14] Q&A. Uh, I believe that everyone can see [51:17] these. Um, and I'm going to start from [51:21] the top and work my way down um, in [51:24] order that they came in. Okay, so first [51:27] question is, what about not I guess it's [51:29] more a statement. What about not [51:31] spending tons of money and keeping our [51:33] property taxes in a small community low? [51:35] The risk is on the homeowners. [51:39] » Uh, I can comment on that one. Uh so I [51:42] mean as Cara mentioned earlier the the [51:44] next step is to do a detailed mitigation [51:47] uh options analysis and figure out what [51:50] is actually recommended and what we need [51:52] to look at. Uh as local government we do [51:54] have an obligation when we are aware of [51:56] a life safety hazard to do something [51:58] about it. Um and then further to that uh [52:01] the new emergency and disaster [52:03] management act or EDMA uh has a section [52:06] in it uh 26 uh 2B I believe uh that [52:10] actually empowers the minister of [52:12] emergency management to actually order a [52:15] local authority to actually place [52:17] mitigation works in place uh if there is [52:20] a significant risk to a community and [52:22] they aren't satisfied with the actions [52:23] taken by the local government. So there [52:25] is a chance that we may not have an [52:27] option. Um and that would be with the [52:30] province. [52:33] » Okay. And then the next statement here, [52:35] it says that there's 31 members of the [52:37] FHS community at the Lion's Den. So [52:40] yeah, that's wonderful to hear that um [52:42] because it shows that we've got a much [52:44] bigger turnout than the numbers on this [52:47] Zoom indicate. So thank you for letting [52:49] us know that. [52:52] Um and then the next statement is stop [52:56] spending our money without the complete [52:58] determination of the community. [53:03] Um and then the next question is [53:06] consultation and engagement means [53:09] exactly what [53:19] I'll answer from um sort of the OCP [53:23] change or the risk tolerance policy that [53:25] may be forthcoming. Um and consultation [53:28] and engagement is largely going to um [53:32] include opportunities for public [53:34] education um and to ensure that that the [53:37] community understands um the different [53:40] pieces that we're considering um and has [53:44] an understanding of why the regional [53:47] district is proposing um ultimately what [53:50] we end up proposing. Um so there it it's [53:54] going to vary um depending on the the [53:57] different um parts of the project. Um [54:00] but key thing is is that we want to make [54:02] sure that the community is informed at [54:04] each step as we move forward. Um, so [54:08] recognizing that there's a whole [54:10] continuum of what consultation [54:13] engagement can mean and sometimes it [54:15] does mean inform and sometimes it does [54:19] mean we're looking for feedback that is [54:22] directly going to impact what the end [54:24] result is. Um, and depending on which of [54:27] the projects um, we're consulting on, [54:29] which ones we're engaging on, it [54:32] potentially is going to um, run the [54:34] gamut of that spectrum. Um, as Christina [54:38] identified, um, at some point the [54:41] regional district might get marching [54:42] orders. Um, we do have these reports [54:45] now. Um, there are actions that we do [54:48] need to proceed with. Um, but we do want [54:50] to make sure that the community is [54:52] informed about um, what's happening in [54:54] your community, why things are happening [54:56] in your community. um and to make sure [54:58] that you have the information um that [55:00] you need to feel comfortable um with [55:03] understanding why the regional district [55:05] is going down the various paths that [55:07] we're going to go down. [55:10] » Okay. And [55:12] » I'd like to add a bit to that. [55:15] » Um I guess from my perspective, a lot of [55:18] what Karen said applies to my projects [55:20] also. Um when when when we're looking at [55:23] things like future mitigation projects, [55:26] um [55:27] ultimately ultimately we want our [55:29] experts to provide us with options that [55:31] we can move forward with. But what we do [55:34] want when we're choosing potential [55:36] options should we have should we have [55:38] them is we want to know what the [55:40] community wants. um what's important to [55:42] the community, like what the what their [55:45] priorities are [55:48] and [55:49] um [clears throat] we'll do the best [55:51] that we can [55:53] to to meet those wants and needs. Um [55:59] provided that, you know, we are [56:02] continuing to um work towards a safe [56:06] community. [56:09] Thanks, Nathan. Is that perfect? Um, [56:12] what is the delta between the old risk [56:15] assessment and the new one? [56:19] » Um, okay. [clears throat] [56:21] I [56:23] the numbers are the numbers are higher [56:27] in the new one and it's quite a bit more [56:30] detailed. So, we do have um we have [56:33] numbers for for different um levels of [56:36] an event. So, you know, we have our 10 [56:38] to 20 or 10 to 30, our 30 to 100, [56:43] but the general [56:45] um [56:48] the general outcomes are not that [56:50] different. Um I'm wondering I do have a [56:54] map I do have the old map at the very [56:56] end of this presentation. If we could [56:58] skip forward just so I can show it [57:00] quickly. [57:03] Yes. So this is our 2013 mapping and [57:08] if you compare it if you compare it to [57:10] our new mapping the general shape is [57:13] very very similar. Um [57:17] the new one like I like I said is just [57:19] more detailed. [57:24] Okay. Um next one. What constitutes an [57:27] event and what are the characteristics [57:29] of an event and what can be done to [57:32] mitigate the severity of the event? [57:35] Example, annual inspection and removal [57:38] of debris from the creek sides. [57:42] So I can should I just quickly go over [57:44] that again? What constitutes an event? [57:47] What are the characteristics of an [57:49] event? And what can be done to mitigate [57:51] the severity of the event? [57:56] Um, I can I can take this question. Um, [57:58] I'm going to assume that the person [58:01] who's asking this question is asking [58:04] about uh debris flows and debris floods [58:08] events. Um, so the kind of they [58:10] constitute between floods to landslides [58:13] is kind of what we're looking at on [58:14] these two creeks. Uh, and when we say an [58:19] event, uh, we're saying, um, some kind [58:22] of flooding or or landslide or debris [58:24] has come down the creek that's [58:26] potentially larger than what the creek [58:29] can handle. So, it often uh has impacts [58:32] to um, like maybe the banks you see [58:36] might see erosion down some of the paths [58:38] or on Fairmont Creek, the golf course [58:41] pond might fill with sediment. um or um [58:44] the stream the creek a bit lower from [58:46] the golf course pond might uh have too [58:48] much water in it and it might flood onto [58:51] roads or into people's uh homes or their [58:54] backyards. So that's what kind of what [58:56] we mean when we have say an event. And [58:58] then there's different magnitudes. So, [59:00] that's kind of what we're describing [59:01] where we might have some fl um smaller [59:03] floods that are at that 10-year return [59:06] period and then we have the larger ones [59:08] or moderate size that might be like the [59:11] 2012 event on Fairmont Creek where you [59:14] saw a lot of mud and rocks and trees [59:16] come down. Um and I think um the last [59:20] part of the question was something about [59:21] how we can mitigate that or bring down [59:23] the severity of the event. Uh and a lot [59:27] of what would need um need to be done to [59:30] bring down um make the event less severe [59:32] might need to happen in the watershed if [59:35] we think about it because the this is [59:36] all coming from up in the watershed when [59:38] it gets rained on or when we have [59:40] landslides and generally we don't see [59:43] that as being feasible uh in Canada. [59:46] These wersheds are really large. We're [59:48] not going to be able to secure every [59:50] slope in the whole watershed. So that's [59:53] why we start to look at mitigation uh [59:56] right where it's needed most. So um on [59:59] the fan where there's uh homes and [1:00:02] people. Uh hopefully that answers the [1:00:04] question and maybe Cara might have [1:00:06] something to add. [1:00:08] » Um no I think you've said a lot of it uh [1:00:10] Beatus. [1:00:12] Um, [1:00:14] I think right now the best we can do to [1:00:16] mitigate severity of events is to make [1:00:18] sure that our existing structures are [1:00:21] maintained and to have an awareness [1:00:24] of weather systems that are coming [1:00:26] towards us and be prepared for them. [1:00:31] And we do our our all of our [1:00:33] infrastructure is inspected several [1:00:36] times a year. So we we do keep close eye [1:00:40] on things. [1:00:43] Okay. Um so next question in one of the [1:00:46] first slides it states quote to ensure [1:00:49] we met uh provincial expectations [1:00:53] should not the province bear most of [1:00:55] that cost? [1:00:57] And then the second part of this [1:00:58] question or I guess it's a statement to [1:01:01] use numbers like 300 years and 1,000 and [1:01:04] 3,000 years is not realistic. [1:01:08] » Yeah, I can comment on the the first [1:01:09] part of that um question there Nathan. [1:01:12] Uh so just for awareness I am in [1:01:15] conversations with uh emergency [1:01:17] management climate readiness uh senior [1:01:19] staff trying to advocate for our [1:01:22] residents uh in coming up with some sort [1:01:24] of sh cost sharing model when it comes [1:01:27] to funding of uh mitigation and ongoing [1:01:30] maintenance of mitigation and and [1:01:32] response costs in general. Uh it is an [1:01:34] ongoing conversation so there isn't a [1:01:36] specific update I can share on that [1:01:37] right now but um we are advocating and [1:01:40] working really hard to try and get costs [1:01:42] kept down. [1:01:48] Um I guess to look at the second part of [1:01:52] that using numbers like 300 years and [1:01:54] 1,000 years [1:01:56] not being realistic. Um, [1:02:00] so a 300-year event [1:02:04] has a 15% chance of occurring in a [1:02:07] 50-year period. [1:02:10] So a 50% chance of an event occurring [1:02:14] in that part of someone's life [1:02:18] is actually fairly significant. [1:02:21] And even a thousand-year event is a 5% [1:02:25] chance occurring. So these these [1:02:27] actually these are [1:02:29] these actually are [1:02:33] these actually do warrant a they do [1:02:34] warrant a response from us and they do [1:02:38] need to be mitigated from and these [1:02:41] these events are are life safety events [1:02:44] that we can't just ignore. [1:02:51] » Okay. Um, the next question, we were [1:02:54] told the Cold Spring Creek project was [1:02:57] for a 1 in300-year event. Now it is [1:03:00] apparently for a 1 in 1,000-year event. [1:03:03] Was the risk assessment wrong of or [1:03:06] sorry, was the risk assessment wrong or [1:03:09] was the dam built bigger than expected? [1:03:17] » Could you address that, Petus? the [1:03:19] changes between the diverse. [1:03:22] » Sure. Um I don't have the specifics off [1:03:26] hand um as I was I was involved in this [1:03:29] a little bit more adjacently but I think [1:03:31] maybe where the confusion is here um is [1:03:36] that I I think the basin was built um a [1:03:41] little bit larger than they had they had [1:03:43] [clears throat] originally designed just [1:03:45] based on the space that was available. [1:03:47] um they were able it was the idea was [1:03:50] that they went to the budget that was [1:03:52] available um to to the design. So um so [1:03:56] there's that part but um really I think [1:03:59] what we're saying is it's that 300 to [1:04:01] a,000year range. Um so we in geoscience [1:04:05] we never put exact numbers on things. [1:04:08] It's hard uh because we don't understand [1:04:10] um or sorry um because there's like a [1:04:13] lot of uncertainty in some of the work [1:04:15] we do. Um, so that's where we have those [1:04:17] ranges, that 300 to a thousand-year. Uh, [1:04:19] and then we compare that to the volume. [1:04:22] Um, I think that's what Cara did in this [1:04:23] presentation. Um, compared that to the [1:04:26] volume of the 1,00 to 3,000-year event, [1:04:28] just showing how much um, residual [1:04:31] hazard there still is and why there is [1:04:34] um, a bit of risk still shown on that [1:04:38] map. It's from that higher return period [1:04:40] event. And some of these return periods [1:04:42] that we study, they um might seem quite [1:04:45] large like uh but as Cara was [1:04:47] explaining, they do have the chance of [1:04:50] happening during someone's lifetime. And [1:04:51] they're actually um we're instructed to [1:04:54] look at these large return periods by um [1:04:57] some of the provincial authorities. Um [1:05:00] so yeah, just give me a bit of context [1:05:02] there. Um to add to that a little bit [1:05:05] further, so we were targeting the 100 to [1:05:08] 300 [1:05:10] year event as as a minimum for our [1:05:12] mitigation. And [1:05:15] that's the event that we looked at [1:05:17] because it's it's the event that is the [1:05:21] most likely to happen that is really [1:05:22] severe if if that makes any sense. [1:05:26] » Um [1:05:28] and the project it was built as [1:05:31] designed. um we didn't build it we [1:05:33] didn't build it larger but we are [1:05:35] looking at um [1:05:39] we're looking at such a big area that it [1:05:40] takes a very a very small change to make [1:05:43] a big difference in volume. So, [1:05:46] you know, we have an extra maybe half [1:05:48] meter high on the dam than we might have [1:05:52] needed to get to the 63, but that covers [1:05:54] a it's such a large area up top that it [1:05:56] makes a big volume difference. [1:06:01] Okay. Um, next [1:06:04] one is [1:06:07] Okay. But there is one open pipe that is [1:06:10] pouring water into creek or into the [1:06:13] creek at the start of the bottom of the [1:06:16] Marble Canyon Trail. So I'm maybe [1:06:18] assuming this is in relation to that [1:06:20] previous [1:06:23] trail question. [1:06:27] » I was not aware of that. Um it's not RDK [1:06:30] infrastructure, but [1:06:33] I'll let the resort know. [1:06:35] » Thank you. Okay. Um, [1:06:39] next one. There's a lot of modeling [1:06:41] going on. So, is there modeling showing [1:06:44] the financial and public safety effect a [1:06:48] flood, debris flow, or landslide has on [1:06:51] a transportation corridor? [1:06:53] In our service area, the highway 9395 is [1:06:56] used daily by business from Cranrook to [1:06:59] Golden and beyond. The loss of business [1:07:02] revenue would be substantial, not to [1:07:03] mention the cost of highway cleanup [1:07:05] and/or replacement. [1:07:07] millions even our education system and [1:07:09] emergency services would endure a long [1:07:11] period of disruption. [1:07:13] So the question in there was is there [1:07:16] modeling showing the financial and [1:07:17] public safety effect a flood, debris [1:07:20] flow or landslide has on a [1:07:21] transportation corridor [1:07:24] specifically I guess highway 9395. [1:07:28] » Uh yeah I think I I can take that to [1:07:30] start with. Uh so as Cara mentioned in [1:07:34] the presentation, we did do a [1:07:37] preliminary economic risk assessment on [1:07:40] Fairmont Creek. So that's taking into [1:07:42] account um approximate costs of the [1:07:46] damage that um these events would do. Uh [1:07:50] but ours is uh the assessment that was [1:07:53] done is is quite preliminary. We mostly [1:07:55] just looked at damages to buildings and [1:07:58] properties and then the cleanup costs [1:08:00] that um RDK has has taken um in previous [1:08:05] events such as like the the annual or [1:08:07] every two-year uh filling of the we um [1:08:11] so we didn't look at all of the business [1:08:14] loss and and I think it's mentioned in [1:08:16] there as a large limitation of our study [1:08:18] that that obviously um was not accounted [1:08:21] for. Uh and um that's [1:08:25] Definitely. It it makes sense that that [1:08:27] needs to or that that is a large loss [1:08:30] though if if the highway was closed. [1:08:45] Sorry, I was muted there. My apologies. [1:08:47] RDK is creating the risk tolerance [1:08:49] policy. Will that not drive which flood [1:08:53] mitigation is recommended? Should the [1:08:55] community not have input as the degree [1:08:57] of risk that as the degree of risk be [1:09:01] willing to tolerate? [1:09:09] Maybe if I could get Tamson to speak to [1:09:13] um the risk tolerance policy [1:09:14] recommendation. [1:09:16] » Sure. Um thanks Karen. Uh so certainly [1:09:20] risk tolerance policy would be one of [1:09:23] the inputs um one of the elements in [1:09:25] making decisions about mitigation but [1:09:27] along with many other ones and um I [1:09:30] think I've heard Karen and Cara speaking [1:09:34] to further engagement on the mitigation [1:09:36] options. Um, if we think about the risk [1:09:40] tolerance policy, um, it's there really [1:09:43] to drive land use decisions. Um, and [1:09:48] really applies to existing development, [1:09:51] uh, as well as new development. And [1:09:52] often there's different tolerances for [1:09:55] that new development as well as the [1:09:57] existing development. with existing [1:09:59] development having a higher tolerance, [1:10:02] the the priority is really to um prevent [1:10:05] future exposure to to the the hazard. [1:10:09] So, it doesn't necessarily point to the [1:10:10] most expensive option for mitigation. Um [1:10:14] certainly uh engagement would occur [1:10:17] moving forward on the risk tolerance [1:10:21] uh policy as Karen's mentioned as well. [1:10:24] Um there is significant precedent in BC [1:10:28] in terms of uh risk tolerance policy [1:10:30] used in other communities [1:10:33] uh for for this for a similar [1:10:35] application. [1:10:42] All right. Um, so the next one, remind [1:10:45] us again why the annual cost to maintain [1:10:48] mitigation works on these creeks in [1:10:50] Fairmont should only be borne by a mere [1:10:53] 1,000 Fairmont rate payers and not [1:10:56] spread out through out the valley and [1:10:58] the MOT. at [1:11:17] I think I'll I'll start this and [1:11:19] probably Christina you could uh weigh in [1:11:22] a little bit on this too because in fact [1:11:25] a lot of the maintenance some of the [1:11:27] cleaning out of the wees the debris, [1:11:29] ponds, that sort of thing. Some of those [1:11:30] costs are recouped. It's my [1:11:33] understanding from from emergency [1:11:34] management. So, all the costs are not [1:11:38] actually being to maintain the [1:11:40] infrastructure uh and clear clear them [1:11:42] out are not being maintained by the [1:11:44] rate. But it there is a provincial [1:11:47] expectation with these grants that we [1:11:50] receive and again Carrie you may want to [1:11:52] add to that but that that we that the [1:11:54] grants the 98% that we received um for [1:11:57] the funding of the of the capital work [1:11:59] is that there was some responsibility on [1:12:02] the on the uh property owners in this in [1:12:05] the service area to maintain that which [1:12:08] is protecting the properties. [1:12:11] » I can jump in there. Sorry, I [1:12:12] interpreted that question slightly [1:12:13] differently than I think it was actually [1:12:15] asked. So, um yeah, when it comes to uh [1:12:18] debris building up in uh the we or in [1:12:21] any of our debris basins, uh if it is of [1:12:24] a sizable note, um then the province can [1:12:28] step in with their response funding, [1:12:30] emergency funding to help us clean those [1:12:31] out so we can reduce the risk and get it [1:12:33] back to a a tolerable standard so that [1:12:35] everybody is safe. Um and from that [1:12:38] perspective, we are um we do that with [1:12:41] every single event that we have. Um the [1:12:44] other comment sort of ties into what I [1:12:45] was talking about earlier with the [1:12:46] advocacy in terms of ongoing [1:12:48] maintenance. So just looking at like the [1:12:50] Cold Spring uh debris basin and trying [1:12:53] to come up with a a cost sharing model [1:12:54] from that perspective to um ensure that [1:12:57] it's not just uh our our taxpayers that [1:13:00] are paying for it, that there is some [1:13:02] some tie into the province there as [1:13:03] well. Cara, is there anything you want [1:13:06] to add to that? [1:13:09] » Um, not really. I think between you and [1:13:10] Susan, do you think you you've answered [1:13:12] the question? [1:13:16] » Nathan. [1:13:17] » Okay. [1:13:18] Um, so next up, does the community [1:13:21] really have any say when the province [1:13:23] minister and RDK are creating their own [1:13:26] guidance report? [1:13:33] The guidance report is really seen as as [1:13:36] the starting point. Um we knew we didn't [1:13:39] have all the answers when it came to um [1:13:42] what we needed to do in order to move [1:13:45] forward proactively with um [1:13:48] acknowledging the outcomes of these um [1:13:50] technical engineering reports. Um so [1:13:55] there will be a certain point um where [1:13:57] the community will have opportunities to [1:13:59] participate. Um but as it's been [1:14:03] identified by various speakers um the [1:14:05] regional district does have obligations [1:14:07] and responsibilities under various acts [1:14:11] um at the provincial level um to ensure [1:14:15] that development is um occurring in a [1:14:18] safe and responsible manner. Um so [1:14:21] within those contexts um we will be [1:14:24] looking at um making sure that um the [1:14:28] actions that are um undertaken um are [1:14:31] moving the RDK and the community towards [1:14:33] those ends. Um and within those [1:14:36] limitations um when there is [1:14:38] opportunities for the community to help [1:14:41] guide the direction um we absolutely [1:14:43] will be looking to capitalize on those [1:14:46] um and like working to ensure that the [1:14:49] community is informed about why um when [1:14:52] we can't um utilize sort of community um [1:14:56] consent or community buyin um to an [1:14:58] extent that you would prefer um why the [1:15:01] regional district um is moving in that [1:15:03] direction as [1:15:05] And I can just add into the ministerial [1:15:08] comment there. So under the new EDMA [1:15:10] legislation, uh the minister is not [1:15:12] currently um to my knowledge ever used [1:15:15] that power. That's a relatively new one. [1:15:18] Um, and so I think if we did end up in a [1:15:21] place where they weren't happy with the [1:15:23] direction that we were proposing, uh, [1:15:25] whether that's, you know, a minimal [1:15:28] mitigation effort or or nothing at all, [1:15:30] whatever the case may be from what comes [1:15:31] out of our analysis, um, there would [1:15:34] likely be conversation between the local [1:15:36] government uh, and the province and [1:15:38] potentially the the community, depending [1:15:40] on how it it all plays out, um, of what [1:15:44] mitigative [snorts] work would be [1:15:46] required or would be acceptable. by the [1:15:48] province. So it may not be like a [1:15:50] specific one that they they dictate. It [1:15:51] could be a variety of things. So uh [1:15:54] there'd be a lot of conversations around [1:15:56] that if we did come down to that. [1:16:00] » Okay. And sorry I um accidentally bumped [1:16:04] over one here. The question is what [1:16:06] about future use of the director [1:16:08] consent? [1:16:12] I'm guessing that one that one's coming [1:16:15] uh is for me. Um so I'm I'm actually [1:16:19] just going to provide a little [1:16:20] background on on when director consent [1:16:23] was used um for the cold spring work. Um [1:16:29] when we first presented the hazard a [1:16:32] similar uh session that we h we're [1:16:34] having tonight regarding the uh cold [1:16:36] spring hazard assessment report. Um it [1:16:40] was the intention to move forward in [1:16:43] with a uh you know with a lot of [1:16:46] community engagement referendum if [1:16:47] necessary before it was determined [1:16:49] exactly what the mitigation work would [1:16:51] would be done. Very quickly after that [1:16:55] presentation, I think we did that [1:16:57] presentation October, November. In [1:16:59] December, there was an announcement made [1:17:02] by the federal government and the [1:17:03] provincial government of fund that we [1:17:06] where we could get up to to up to $10 [1:17:08] million of funding from for and we had a [1:17:12] very brief window uh opportunity to [1:17:15] submit our application for that. So, we [1:17:17] decided to do it because when we were [1:17:19] speaking originally during the [1:17:20] presentation, we had all envisioned a [1:17:22] 25-year [1:17:24] phased approach to building uh [1:17:27] mitigation works on Cold Spring Creek. [1:17:30] So, that fund uh that application came [1:17:34] forward. Um we submitted the application [1:17:37] in order through a number of questions [1:17:40] and I think Carrick could probably uh [1:17:42] add to this. Um it was determined um [1:17:46] that the best way forward was to do [1:17:48] director uh consent to whereas I asked [1:17:53] the board to support the the work going [1:17:57] forward that then was sent to the [1:18:01] minister [1:18:02] uh responsible for their approval. So it [1:18:05] wasn't just a director uh making the [1:18:08] decision. It was it was more about the [1:18:12] process to move forward because the [1:18:14] timing in order to for us to accept um [1:18:18] and apply accept the funding that was [1:18:21] being that was looking very optimistic [1:18:23] within a very short time of being of [1:18:26] applying for that grant um [1:18:29] uh didn't allow for the the timing of a [1:18:32] of a referendum. and the cost of a [1:18:35] referendum would have been anywhere from [1:18:38] $40 to $50,000. So there was a lot of [1:18:40] factors involved. And so it wasn't just [1:18:43] me as the director a directing staff to [1:18:45] make to go forward. It was me asking the [1:18:49] board to ask the minister. And so that's [1:18:52] that's what happened there. the minister [1:18:54] and and the ministerial staff reviewing [1:18:57] the application both federally and [1:18:59] proincially looked at the application, [1:19:01] looked at the hazard assessment and [1:19:02] determined it was the best uh way [1:19:05] forward. And that's how we were able to [1:19:07] get just over $9.7 million from that [1:19:10] particular fund and subsequent funds [1:19:13] bringing us to a 98% funding on that [1:19:15] project. So that's why that decision was [1:19:18] made. And so at this point, I don't see [1:19:20] that I'd be shocked if we saw that kind [1:19:23] of granting opportunity again. So it [1:19:25] wouldn't be my intention to um to use [1:19:29] that tool again. Um but that said, I [1:19:33] don't think we can ever say definitely [1:19:35] never, but uh certainly not the [1:19:37] intention um at this stage because I [1:19:39] don't see us with that same financial uh [1:19:42] opportunity. [1:19:50] Okay. Um, next question. At the 2025 [1:19:55] area F town hall meeting, the RDK [1:19:57] responded yes when asked whether the [1:20:00] residents of Fairmont would be given the [1:20:02] opportunity to participate in a [1:20:03] referendum regarding Fairmont Creek [1:20:06] flood and landslide mitigation project [1:20:08] works. Will the RDK continue to hold [1:20:11] this position? [1:20:15] Um, so I believe that was me that [1:20:17] responded yes at that area F town hall. [1:20:19] So I'll take this question. [1:20:21] Um, I don't know if it'll be a [1:20:23] referendum or exactly what the process [1:20:25] would look like. Um, [1:20:28] our intent is to engage the community as [1:20:30] much as we can and still [1:20:33] um, meet our obligations with protecting [1:20:36] community. And like in my my ideal [1:20:40] world, you know, we have plenty of time [1:20:42] to go through all the engagement we want [1:20:44] and to select a project [1:20:47] and um you know, plan for plan for the [1:20:52] future as much as we can and you know [1:20:55] maybe in 2 years we have that great [1:20:57] funding opportunity that came up that we [1:20:59] were able to apply for for Cold Spring [1:21:01] Creek. [1:21:03] Um so yes my our intent is to engage [1:21:07] community as much as we can and to [1:21:10] listen to your wants and [1:21:14] and also your what you don't want. [1:21:21] » Okay. Um what level of risk is tolerable [1:21:26] and who decides the residents or the [1:21:29] developers? I am free to choose the risk [1:21:31] to drive my car. Why do I not have the [1:21:34] input in choosing the risk I will accept [1:21:36] in a flood? [1:21:39] » Yeah, I can take that one. Um, it's a [1:21:40] good question. There's a number of [1:21:42] factors involved in this one. So, uh, [1:21:45] for starters, I guess just to look at [1:21:46] your example, um, driving your car is an [1:21:50] individual choice, whereas what we're [1:21:52] looking at here is a communitywide [1:21:54] impacts potentially to a large group of [1:21:56] people, not just an individual. um when [1:21:59] it comes to determining risk and from [1:22:01] the provincial perspective, uh they look [1:22:04] at the BC emergency response sort of [1:22:07] goals or guidelines uh which is [1:22:09] protecting lives, uh protecting public [1:22:12] health, um reducing suffering, [1:22:14] protecting property and infrastructure. [1:22:16] Uh there's a whole list including [1:22:18] economic and social losses. Uh there's a [1:22:20] whole variety of things there. There's [1:22:21] also a lot of precedents already set um [1:22:24] both legally and just in um response to [1:22:28] other emergencies and and mitigative [1:22:30] works where where exist um disasters [1:22:33] have existed. Uh so it there's all a lot [1:22:36] there. Um we look at recommendations [1:22:38] from qualified professionals as well. Um [1:22:41] yeah, that kind of sums that one up I [1:22:43] think. [1:22:46] » Okay, thanks for that. Um, would it not [1:22:49] be better to have mitigation upstream to [1:22:52] avoid destruction in the flood fan? [1:22:54] Example, annual inspection of the [1:22:56] watershed done by a drone, [1:22:59] identification of debris piles and [1:23:00] removal to bring down costs. [1:23:05] » Uh, I can take this question. Uh, this [1:23:08] is a really interesting and uh, great [1:23:11] question. Um, and the reason we [1:23:14] generally don't look at mitigation in [1:23:17] wersheds is due to the cost. So, the [1:23:21] idea of flying a drone and taking a look [1:23:23] at the wershed. Excellent. I love it. I [1:23:25] like looking at what's happening up [1:23:26] there and seeing what the sediment [1:23:28] supply is like. Uh, it gives us an idea [1:23:30] of what we can expect in the future. Uh, [1:23:33] but the access to be able to clean that [1:23:35] out if we do see debris building up is [1:23:38] is really really challenging. uh you're [1:23:40] not going to be able to get excavators [1:23:42] up there or trucks and things like that. [1:23:44] And so that's why we tend to look at [1:23:46] mitigation options that are accessible. [1:23:49] Uh so that brings the cost um down [1:23:52] substantially. [1:23:58] » Okay. Um our costs for the local service [1:24:02] area have already increased 600% from [1:24:06] 2020 to 2024. How much more can we be [1:24:09] expected to bear with this new project [1:24:11] on Fairmont Creek? We need a tax [1:24:14] decrease, not increase. [1:24:20] Um, at this point, we absolutely can't [1:24:23] put a number on it at all. Um, [1:24:28] and this possible project on Fairmont [1:24:31] Creek could be many years into the [1:24:34] future. At this point, it'll be [1:24:35] dependent on funding and on what we look [1:24:39] at doing on the creek. [1:24:46] » Okay. Um at our last area F town hall [1:24:49] meeting, um community members asked [1:24:52] about costs and mitigation of Fairmont [1:24:55] Creek. The response was that possibly [1:24:58] very little will be needed to be done as [1:25:01] work was completed in 2017 2018. [1:25:05] Now we're looking at costs upwards to 20 [1:25:07] million for flood mitigation. What [1:25:10] changed in the last 4 months? [1:25:17] » Well, at the area F town hall, we did [1:25:20] not have the results of the updated [1:25:23] hazard assessment yet. So, we didn't [1:25:25] know what the new what the outcome of it [1:25:27] was going to be, what the new volumes [1:25:28] were going to be, and what the map was [1:25:29] going to look like. Um, so we do have [1:25:32] some mitigation on the creek, which is [1:25:36] um which has done a very good job of [1:25:39] protecting community and the events that [1:25:41] have happened in the last few years. Um [1:25:45] but now that now that we have the [1:25:48] results, we do know that we you know [1:25:50] more work is likely warranted [1:25:54] and um we'll move forward as best we can [1:25:58] with community engagement and um working [1:26:01] with our consultants. [1:26:05] » Okay. Um what is the order of natural [1:26:09] hazard risks to Fairmont? We are very [1:26:12] focused on flood mitigation yet. Is not [1:26:15] forest fire a much greater risk that [1:26:17] might strike while we are looking at the [1:26:19] creek hazards? [1:26:21] » Yeah, that's a good question. Um, so we [1:26:23] are actually currently undertaking our [1:26:25] hazard risk and vulnerability analysis [1:26:27] update. Uh, in the last one, I don't [1:26:30] have the exact ranking for uh Fairmont [1:26:32] in front of me, but our top three [1:26:34] hazards across the entire East Coupney [1:26:35] are wildfires, floods, and dangerous [1:26:37] goods. each community's uh vulnerability [1:26:40] to each of those is going to be a little [1:26:41] bit different uh depending on where you [1:26:43] are and what your hazards are uh in that [1:26:46] immediate area. Um but that is uh what [1:26:49] is being looked at right now. So um and [1:26:52] on the wildfire comment, we have a very [1:26:55] active and engaged fires smart program [1:26:57] throughout the region that works with [1:26:58] homeowners to reduce the risk of [1:27:00] wildfire around your house. Um and so we [1:27:03] have that going on. And then the [1:27:04] province uh also has a wildfire risk [1:27:06] reduction program that they actively [1:27:08] work on as well. [1:27:13] Okay. The pro this is the next question. [1:27:15] The process as I understand it was a [1:27:18] recommendation to the RDK board who [1:27:20] unanimously approved the recommendation [1:27:22] to the minister for approval. This [1:27:24] resulted in 98% plus of total costs [1:27:27] being ultimately covered in order to [1:27:29] best protect us as rateayers. Thank you. [1:27:33] So I guess that was just not a question [1:27:35] that was a statement. [1:27:39] Um [1:27:43] Caris stated sorry this is the next [1:27:46] question. Car stated there would be lots [1:27:48] of engagement regarding future [1:27:50] mitigation projects. There are over 31 [1:27:52] people sitting in a room in FHS [1:27:56] sorry hot springs. Believe me we are [1:27:58] engaged. You should be here in person. [1:28:05] I I just would like to comment on that. [1:28:08] I think that's great and we also have 30 [1:28:10] participants online. So, I think it's a [1:28:13] great combination that this Zoom meeting [1:28:15] has really enabled um participation by [1:28:20] uh a large group of of community members [1:28:23] and and whether they're here in Fairmont [1:28:26] Hot Springs as I am or as um or in uh [1:28:32] elsewhere in the country or even um in [1:28:34] the world. So, I think I really [1:28:37] appreciate that so many people are [1:28:38] engaged. this is this uh just proves to [1:28:41] me that this was a great way to have [1:28:42] this initial this initial meeting [1:28:44] because it provided access for um over [1:28:48] 60 people. So, thank you. [1:28:53] Okay, for uh the next one, for some [1:28:56] community members, and um you're going [1:28:58] to have to forgive me because I don't [1:29:00] know what one of these what this means. [1:29:02] For some community members, the increase [1:29:04] in tax RT debris mitigation is $1,000 a [1:29:08] year. Over a 20-year period, this [1:29:11] amounts to 20,000. Add another dam to [1:29:14] Fairmont Creek potential to 40,000 for [1:29:16] one property owner. Is this fair? [1:29:28] I I don't think we're at that stage of [1:29:31] quantifying what the impact could be or [1:29:35] will be at this point. So, I'm not even [1:29:38] sure the best way to to respond um to [1:29:43] your question. I guess is it depends on [1:29:47] on um what the uh what mitigation work [1:29:50] is determined to be done through through [1:29:53] the process that we've explained we're [1:29:55] going to be going through this evening [1:29:57] and and uh you know what that protection [1:30:00] of of property infrastructure and life [1:30:03] is. So um yeah I guess we will determine [1:30:07] as we move forward what's going to make [1:30:09] the most sense for the community of [1:30:11] Fairmont. [1:30:15] Okay. Um, so this actually that was the [1:30:17] last question, but now one more has come [1:30:18] in and I'm I'm not trying to shut it [1:30:20] down. I'm just sort of letting people [1:30:22] know if they're sort of maybe last call [1:30:24] if you will. Um, this next question is [1:30:27] Oh, one more is coming apparently too. [1:30:29] Okay, [laughter] [1:30:30] next question. When do you plan to know [1:30:33] what mitigation plan will be determined? [1:30:39] Um that'll depend on what when we can [1:30:42] get funding to do the options analysis. [1:30:44] Um [1:30:46] and then however quickly we move through [1:30:49] that through that process and then [1:30:50] beyond that we may choose an option. [1:30:53] However um we will still need to to um [1:30:59] apply for and be successful in getting [1:31:01] funding for it. So it [1:31:05] hard question to answer but it won't be [1:31:07] in the next couple of months. [1:31:10] It could be up to yours. [1:31:13] » Okay. And yeah, I want to be clear. I [1:31:15] wasn't I'm not trying to rush anyone. So [1:31:17] we do know that there is one more [1:31:18] question coming in. So we will gladly [1:31:20] wait for that one and [1:31:23] maybe more. [1:31:25] So um yeah, don't worry. You don't have [1:31:29] to you don't have to type too fast. You [1:31:32] got time. [1:31:49] So, I will just take this moment though [1:31:51] to remind anyone that once this [1:31:53] recording is done, we will get it up [1:31:56] onto the engage page as quick as we can [1:31:59] um and then send it out the link via the [1:32:03] um the community emails. So, please make [1:32:06] sure uh if you're not already signed up [1:32:08] for it, sign up for that community [1:32:09] email. You can do that at rdk.bc.ca. [1:32:14] And at the top it says um what is the [1:32:17] wording? Stay informed. And so there's a [1:32:20] little stay informed button at the top [1:32:21] of our main page on our website. Click [1:32:24] that and you can sign up for the emails. [1:32:26] And that way um especially on the on [1:32:29] projects like this, you will be the [1:32:31] first one to find out what's going on. [1:32:34] That's our first way of getting the word [1:32:35] out. Okay. Um the question has come in. [1:32:40] Debris flows are created when debris [1:32:42] piles when debris piles up along the [1:32:45] creek bed and impair the natural flow of [1:32:48] water. Under severe weather events, the [1:32:50] water is impeded by the debris creating [1:32:52] a dam effect. When this material and the [1:32:55] dam breaks, it creates a debris flow [1:32:58] into the fan. Why is everything you [1:33:01] consider mitigation a local mega [1:33:03] project? [1:33:09] Um maybe I'll I'll start and and others [1:33:12] can jump in if they have other um [1:33:14] thoughts. So I um this is something that [1:33:19] could occur um in the watersheds here, [1:33:22] but that's not actually the only type of [1:33:25] debris flow we get. Um, a lot of the [1:33:28] time, um, when we have a large rainfall [1:33:31] or an intense rainfall, so, uh, really [1:33:34] high amounts of rain in a short period, [1:33:36] it can mobilize sediment that's already [1:33:38] in the channel. And as most of you when [1:33:40] you look up at the mountains there, you [1:33:42] know that there's like a lot of, um, big [1:33:44] rock boulder fields up there. So, all of [1:33:47] that starts to kind of mobilize. There's [1:33:50] so much sediment up in these watersheds [1:33:52] that's available for transport when [1:33:54] there's enough rain. So that's kind of [1:33:55] how we see debris flows start um or from [1:33:58] landslides on the side of the creek [1:34:01] entering the creek. Um so yeah, that's [1:34:04] one uh those are a couple different ways [1:34:06] that debris flows can uh start and I [1:34:09] think the main question here is why does [1:34:11] it have to be a large project? Um there [1:34:13] are different options as Cara presented. [1:34:16] So there's kind of different levels um [1:34:18] that we've looked at um but we're aiming [1:34:21] to improve the life safety risk on the [1:34:24] fan. So that requires a little bit [1:34:26] higher of a level of mitigation because [1:34:29] we're trying to um reduce the risk of [1:34:32] those larger events impacting people's [1:34:35] homes. Um but there are like some small [1:34:38] or like lesser um not as large projects [1:34:41] and everything that can be done as well. [1:34:43] Um it just might not have um the [1:34:46] intended outcome. And I'll let Cara um [1:34:48] or someone else add to that if they have [1:34:50] anything else. [1:34:56] Um, I don't really have anything else to [1:34:58] add to that. P. I think you've you've [1:35:00] answered it. [1:35:03] Okay. Um, next question. Why would the [1:35:06] annual cost of these mitigation projects [1:35:09] not be shared throughout the valley [1:35:10] communities given the potential impact [1:35:12] to the transportation corridor? [1:35:30] and um the follow-up question to that [1:35:33] the next one is it just it's please be [1:35:35] clear when answering why would the [1:35:36] annual cost of these mitigation projects [1:35:39] not be shared throughout the valleys or [1:35:41] sorry throughout the valley communities. [1:35:51] Yeah, I think I I'm I might follow up on [1:35:55] this question maybe through the enga [1:35:57] engage page because uh I just want to be [1:36:00] clear this is to some degree this is a [1:36:02] bit of probably a a decision that was [1:36:05] made uh 2013 is what the the size of the [1:36:09] service area and it was certainly before [1:36:11] my time. Um but this is a uh the service [1:36:14] area and and it's really depends on it's [1:36:17] about how the regional districts um pay [1:36:21] for services. We're not like a [1:36:23] municipality where we uh have a budget. [1:36:26] We collect taxes for that budget and [1:36:30] then that money is spent per the budget. [1:36:32] Each service area has to have a budget [1:36:35] and to do any work uh in the regional [1:36:38] district we have to have a service area [1:36:40] and the service area for this work is uh [1:36:45] was determined um um I think it goes [1:36:47] back to 1989 actually if my memory [1:36:50] serves um by the Fairmont Flood and [1:36:53] Landslide Service Area. So that's that's [1:36:57] where it's at right now and it it is the [1:37:00] greatest number of impacted residents. [1:37:03] Um there are opportunities for you know [1:37:07] transportation to be uh or for for [1:37:10] people to kind of egress the community [1:37:13] on either side of Fairmont whether [1:37:15] through through Cranbrook or through [1:37:17] through Radium. And so I imagine that [1:37:20] might have had something to do with that [1:37:22] original um determination of what the [1:37:24] service area looked like. So I I think [1:37:27] we can certainly follow up with a more [1:37:29] wholesome answer as to what that [1:37:31] processes, but um this does date back um [1:37:35] to to the late 80s and how the service [1:37:38] area was structured and set up. [1:37:44] » Okay. Um [1:37:49] The next one, [1:37:51] can you be more specific about exactly [1:37:53] what input citizens will have in the [1:37:56] risk development policy? [1:38:00] So, I'm going to assume that this is [1:38:02] with respect to the risk tolerance [1:38:05] policy. Um so we do have a clear [1:38:08] recommendation in the guidance report um [1:38:12] that outlines a proposed framework. [1:38:16] Um and so I think that um if it's [1:38:19] largely going to be um at the inform [1:38:23] level of engagement [1:38:25] um but that would be determined um based [1:38:28] on uh direction provided to staff um and [1:38:32] at the discretion of the regional [1:38:33] district board. Um I think a key thing [1:38:37] um that has been touched on by a number [1:38:39] of different speakers uh this evening [1:38:42] has been that um these frameworks are [1:38:45] something that are um have legal [1:38:47] precedent. Uh they have precedent in [1:38:49] other comparable communities um and that [1:38:52] that that's what we're going to be [1:38:54] drawing from on that. Um so really it's [1:38:57] largely wanting to make sure that the [1:38:59] community understands [1:39:02] um the basis and the premise for um that [1:39:05] um but that we are like we have a clear [1:39:08] recommendation in the report um and we [1:39:10] anticipate that that that's what will be [1:39:12] brought forward. Um so it it likely will [1:39:15] be um at the inform level of [1:39:19] consultation. [1:39:21] um but that we will um embark on that [1:39:24] and that we will have that and if it is [1:39:27] uh the decision is made by the board [1:39:29] that it's original districtwide [1:39:31] um policy um so it's not that it is [1:39:34] something that is specific to Fairmont [1:39:37] or specific to these debris floods um [1:39:39] but is generally speaking that as um [1:39:42] Christina's identified we recognize [1:39:44] there's a range um of hazards and [1:39:47] vulnerabilities across the regional [1:39:49] district and that would um factor in to [1:39:53] that as well um is that it won't just be [1:39:56] the Fairmont community that we will need [1:39:58] to have that uh discussion with to have [1:40:01] that consultation with. Um it will be [1:40:03] original district-wide discussion that [1:40:05] we'll be having. [1:40:12] Okay. Um there's a a two-part sort of [1:40:15] question statement here. Have you driven [1:40:17] through the Crows Nest Pass with respect [1:40:20] to major rock slides? [1:40:24] Um, I would say that yes, most of us [1:40:26] have driven through Crow's Nest Pass and [1:40:28] have seen that rock slide. Yes. I'm not [1:40:32] sure what the uh statement or question [1:40:35] is behind that one though. [1:40:39] And then the next one, the majority of [1:40:42] Fairmont Creek is on private resort [1:40:44] land. Will that be taken into [1:40:46] consideration when the mitigation is [1:40:47] done on it? [1:40:51] » Um [1:40:53] that it's on private land is considered [1:40:55] to a certain extent. Um the important [1:40:57] thing really is that [1:41:00] um the impacts of the debris flows that [1:41:02] come down Fairmont Creek are not just on [1:41:04] private resort land. They're they're in [1:41:07] the wider community [1:41:12] and water is [1:41:15] water is considered crown. However, [1:41:19] it's the impact that we have to think [1:41:21] about [1:41:23] and the impact again is in the [1:41:24] community. [1:41:35] Um and then a statement afterwards [1:41:38] saying and water is federally [1:41:40] controlled. [1:41:47] I'd just say yes um that that is [1:41:48] something that's recognized is um [1:41:50] depending on the type of water. Uh [1:41:53] generally speaking, the federal [1:41:54] government is concerned when it's [1:41:57] navigable waters or if it's with respect [1:42:00] to um like department of fisheries and [1:42:03] oceans and fish habitat. Um it's [1:42:06] definitely something that um is [1:42:08] recognized is that water um falls under [1:42:12] multiple jurisdictions and that's why um [1:42:16] when we proceed with this there's [1:42:17] different levels of government involved [1:42:19] in the different stages and processes. [1:42:28] Okay, we are uh we have no more qu open [1:42:30] questions right now. There is one that I [1:42:32] did want to address that was sort of [1:42:34] earlier uh questioned and I answered it [1:42:37] um privately to the asker. Um and it was [1:42:41] just about the water utility issues. Um, [1:42:43] and the question was or the statement [1:42:45] was the water utility issues are more [1:42:47] immediate and should be looked at how [1:42:49] the and and should be looked at how the [1:42:51] RDK can support our failing system. And [1:42:54] so the answer I I answered that [1:42:56] individual with Fairmont Hot Springs [1:42:58] Utility. The reason I'm bringing this up [1:43:00] is I I do know it's big for a lot of the [1:43:02] people is privately owned and operated [1:43:05] and falling under the regulation of the [1:43:07] controller of water rights, Interior [1:43:09] Health and the province. Uh [1:43:11] consequently, the RDK does not have any [1:43:13] jurisdiction or authority and cannot [1:43:14] intervene directly. However, um director [1:43:17] Clochuk has been actively involved on [1:43:20] behalf of the customers of FHSU. Uh [1:43:23] she's been reaching out to the office of [1:43:24] the water controller and FHSU staff, the [1:43:27] MLA and the Ministry of Water, Lands, [1:43:29] and Resource Stewardship to advocate for [1:43:31] the community's concerns to be heard and [1:43:34] for actions to be taken to address them. [1:43:36] Um, the only reason I bring that up is I [1:43:38] believe that that answer may have gotten [1:43:42] lost to that individual. So, I'm sorry [1:43:44] to that individual. [1:43:49] Okay. Yeah. And that's it. We have no [1:43:51] more open um questions any more. So, I'm [1:43:56] going to mute and allow either Karen or [1:44:00] Susan to finish us off. So yeah, I'll [1:44:03] just um I had a a few things I just [1:44:06] wanted to highlight on this final slide [1:44:08] that you hopefully can see. Uh and then [1:44:10] I'll pass it off to Susan to wrap up for [1:44:12] the night. Um so again, just wanted to [1:44:15] to draw your attention if you have not [1:44:18] already been on the engage page. Um we [1:44:20] do have all three reports available on [1:44:24] uh the fair um debris mitigation page. [1:44:28] Uh they will remain available in their [1:44:30] entirety. Um so um we do recognize that [1:44:34] um they're large reports. There are [1:44:35] three reports uh that people might want [1:44:39] to um you know peruse them at their [1:44:42] leisure. Uh so we'll keep them [1:44:44] available. Um and also to recognize that [1:44:47] um staff contacts so for the RDK and if [1:44:50] you don't already have the information [1:44:52] director Clostchuck's contact [1:44:54] information is also directly on those [1:44:57] pages. Uh so if you have questions [1:45:00] you can either send them directly to [1:45:02] staff or you um we will set it up so [1:45:06] similar to the advanced questions where [1:45:09] you could send a response just kind of [1:45:12] uh generically uh to the page um we'll [1:45:15] set up something similar um and then um [1:45:18] if you provide your contact information [1:45:20] with that um we'll ensure it's set up [1:45:22] that way um it will be able to be [1:45:25] directed to the appropriate staff um and [1:45:27] we will be able to respond to you. Is [1:45:30] that director club? Chuck, did you have [1:45:32] anything you'd like to finish on? [1:45:34] » Yeah, I just I just would like to say [1:45:36] thank you to everyone who's [1:45:38] participated, those at the uh at the [1:45:40] Lion's Den and and those from the [1:45:42] comfort of your homes um here on Zoom [1:45:45] tonight. Your questions were great and [1:45:48] they're really important and we want you [1:45:49] to keep them coming. Uh, I think what [1:45:52] I'm going to do is I'm going to ask [1:45:54] staff to um, you know, reflect on what [1:45:58] we heard this evening and the questions [1:46:00] that were asked and provide um, maybe in [1:46:03] some cases some more wholesome responses [1:46:06] uh, articulate those questions um, and [1:46:08] make them available also on the engage [1:46:11] site. Um, and I really want to thank, [1:46:14] you know, uh, all the staff that joined [1:46:17] us this evening, Karen and Cara, uh, [1:46:20] Christina for your bringing your [1:46:22] expertise and and Ryan, who I failed to [1:46:25] introduce, uh, at the beginning, uh, [1:46:27] who's providing some support there for, [1:46:30] uh, for Nathan as the as supporting the [1:46:32] the technology and making sure that we, [1:46:34] we, uh, got everything done tonight that [1:46:37] we needed to get done. And of course the [1:46:38] consultants providing your expertise and [1:46:40] knowledge and and hearing the concerns [1:46:43] of the community um through the lens [1:46:45] that you look at these issues on as well [1:46:48] I think is is probably very valuable as [1:46:50] we move forward on where these projects [1:46:53] may end up. So again thank you so very [1:46:57] much and um we will uh just keep your [1:47:02] questions coming. that is the best way [1:47:04] for us to do to do the work here and [1:47:06] make sure that the community is is uh is [1:47:10] safe and and that the community members [1:47:13] uh feel heard and respected throughout [1:47:16] this process. So, thanks again and enjoy [1:47:18] the rest of your evening. And I know [1:47:20] it's going to feel really cold when [1:47:22] Nathan just turns off the Zoom. We're [1:47:24] all just going to disappear into the uh [1:47:27] into the ether and not it's not like [1:47:29] wandering out of a room and having a [1:47:30] chat in the hallway. So, it's it's going [1:47:32] to feel really odd, but but thank you [1:47:34] again for your uh participation. Please [1:47:37] don't hesitate to get in contact if you [1:47:40] uh need anything. [1:47:43] » Okay. And um I'm not going to turn off [1:47:45] quite yet, Director Kchuk. So, you can [1:47:48] rest assured that we can just spend a [1:47:50] few more moments together because there [1:47:51] was one quick question um asked about [1:47:54] making the maps more easily findable on [1:47:57] the engage page. And yeah, we will [1:47:59] definitely uh work on that. And the [1:48:01] engage page is great cuz we are changing [1:48:03] it and updating it as much as we can. So [1:48:06] if you ever do see things on the engage [1:48:08] page that you want um or have any sort [1:48:13] of input to the engage page, please let [1:48:15] us know and we will work on that um and [1:48:17] keep changing it up to make it the best [1:48:19] we can. So thank you and um I hope [1:48:22] everyone has a great evening and thanks [1:48:23] for all your input.