1 00:00:00,910 --> 00:00:29,830 Immigration, planning, commission, meeting, Thursday, August 13, 20, 26, the time is 8.32 am. Thank you, Wendy. First, I just want to say thank you all for coming. Because your input is very valuable to everyone involved in every issue that we deal with. Also, thank you. You're very well trained. I mean, right on the dock, you just all planned off. It's very quiet. It's good. My name is Tim Harp. 2 00:00:29,830 --> 00:00:33,010 I'm the chair of the planning commission here at the table. 3 00:00:33,190 --> 00:00:34,350 We also have Jodie Gerot. 4 00:00:34,550 --> 00:00:37,350 She's our vice chair and two other commissioners, 5 00:00:37,570 --> 00:00:38,970 Andy Wallace and Dale Bereth. 6 00:00:40,170 --> 00:00:43,310 We have a fifth position that we expect 7 00:00:43,310 --> 00:00:46,410 to be filled at the next city council meeting. 8 00:00:47,910 --> 00:00:51,130 And we'll be introducing that person later 9 00:00:51,130 --> 00:00:54,410 in this meeting for those who care to stick around. 10 00:00:57,540 --> 00:01:00,860 At this point, what I'd like to do is read the document 11 00:01:00,860 --> 00:01:10,030 that we do. We can't hear you. Okay. I'll read a document that we go over before every meeting. 12 00:01:11,110 --> 00:01:16,770 And again there are I think there are some more chairs in the back room if anybody wants to 13 00:01:16,770 --> 00:01:21,470 pull some out so we've got more people coming in. You can take two of these. We're going to say one 14 00:01:21,470 --> 00:01:26,170 but you take two of these. Yeah. Two of these chairs are available. 15 00:01:28,960 --> 00:01:31,640 The copy of our agenda is on the 16 00:01:31,640 --> 00:01:38,760 table here. We also have a sign-up sheet being passed around. We'd appreciate your 17 00:01:38,760 --> 00:01:44,680 signing in so we know who is here. The Planning Commission is a voluntary citizen 18 00:01:44,680 --> 00:01:50,140 board. The Commission's function is to hear and decide applications for 19 00:01:50,140 --> 00:01:55,040 conditional uses and preliminary subdivision plots to make recommendations to 20 00:01:55,040 --> 00:01:59,260 the Immigration and Canyon City Council, preserving changes or changes to 21 00:01:59,260 --> 00:02:01,480 ordinances, or journal plans. 22 00:02:02,810 --> 00:02:05,800 Our agenda is divided to categories, business items, 23 00:02:06,000 --> 00:02:06,940 and public hearing items. 24 00:02:08,490 --> 00:02:12,060 We're going to start with the public hearing 25 00:02:12,060 --> 00:02:14,720 item of the agenda, which we have one. 26 00:02:15,380 --> 00:02:16,580 I'll introduce that shortly. 27 00:02:18,160 --> 00:02:19,620 Our meeting is recorded. 28 00:02:20,620 --> 00:02:24,540 So when you care to come up and speak 29 00:02:24,540 --> 00:02:27,920 after I recognize you, please take a seat at this chair. 30 00:02:27,920 --> 00:02:36,080 state your name and address so we have that for the record. We also have we are 31 00:02:36,080 --> 00:02:44,340 online. When do we have do we have anybody online of the public? Or is it all 32 00:02:44,340 --> 00:02:50,880 staff? It's all staff and then Patrick Nelson the Salt Lake City and then Ryan 33 00:02:50,880 --> 00:02:53,200 and we like the public house. 34 00:02:53,860 --> 00:02:54,540 Thank you. 35 00:02:54,660 --> 00:02:59,860 So we may have some folks online from the public, 36 00:03:00,220 --> 00:03:03,800 and we'll hear from that in the public hearing portion 37 00:03:03,800 --> 00:03:04,660 of our meeting. 38 00:03:09,840 --> 00:03:12,880 Let's see, I think that covers most of it. 39 00:03:13,300 --> 00:03:15,900 The way we'll conduct the hearing today is, 40 00:03:16,700 --> 00:03:19,760 we'll start with a presentation by our staff, 41 00:03:20,560 --> 00:03:24,400 who are present here as well as online, if necessary. 42 00:03:24,400 --> 00:03:29,900 We will then have a presentation by the applicant, the 43 00:03:29,900 --> 00:03:33,240 property owner, and then I'll open the public hearing for 44 00:03:33,240 --> 00:03:33,660 comment. 45 00:03:34,120 --> 00:03:35,920 Please raise your hand to be recognized. 46 00:03:36,500 --> 00:03:39,740 As I recognize you, would you please come forward, have a seat, 47 00:03:40,160 --> 00:03:43,960 state your name and address as I mentioned before, and give us 48 00:03:43,960 --> 00:03:44,420 your comments. 49 00:03:45,140 --> 00:03:48,080 Now we have had a ton of comments. 50 00:03:48,380 --> 00:03:53,620 We have read a lot of letters and emails from you, and we 51 00:03:53,620 --> 00:04:00,300 appreciate that input and so what I'd like to suggest is that if someone ahead of you has made 52 00:04:00,300 --> 00:04:05,860 your point or points please just point that out to us and that'll save time for more 53 00:04:05,860 --> 00:04:12,480 view to make comments as well as after the hearing is closed then we will go to the commission will 54 00:04:12,480 --> 00:04:19,020 go into a discussion and deliberation period and that will give us more time to have that discussion. 55 00:04:19,020 --> 00:04:25,280 So with that in mind, I think we are ready for the presentation. 56 00:04:25,980 --> 00:04:27,500 Let me ask the commissioners. 57 00:04:27,800 --> 00:04:33,720 Does anyone have any proposed changes to the agenda that we have before us? 58 00:04:34,480 --> 00:04:39,160 Just that our City Council member wants to speak first. 59 00:04:39,880 --> 00:04:48,260 Yes, we do have a member of the City Council here who I'll recognize as the first speaker during the public hearing portion. 60 00:04:49,020 --> 00:04:59,980 Okay, then we'll we have no changes to the agenda and so I think we're prepared at this point to go ahead with our staff presentation. 61 00:05:01,500 --> 00:05:07,800 Thank you, Chair. My name is Claire Gilmore, and I'm with this firm of Smith Park. 62 00:05:07,800 --> 00:05:13,940 I represent Immigration Canyon in Matthews Matters. 63 00:05:13,940 --> 00:05:17,500 Today, we're going to, the planning commission is going to review 64 00:05:17,500 --> 00:05:21,280 the proposed conservation development agreement 65 00:05:21,720 --> 00:05:26,740 as between property owner Ryan Mike and Immigration Canyon 66 00:05:27,620 --> 00:05:35,120 for a 48-year parcel that he owns in the FR-20 zone 67 00:05:35,120 --> 00:05:42,360 which is a forestry and recreational zone under Title 19 of the immigration planning code. 68 00:05:44,280 --> 00:05:53,020 As a preliminary matter, I think that it's going to be very important and really effective 69 00:05:53,020 --> 00:06:01,800 for us all to get on the same page about what constitutes land use 70 00:06:01,800 --> 00:06:07,920 and what the purview of the Planning Commission's authority is today. 71 00:06:10,220 --> 00:06:11,500 I'm hoping that it will 72 00:06:11,500 --> 00:06:16,400 make for a far less exciting meeting than perhaps we anticipated. 73 00:06:21,780 --> 00:06:24,900 Under Utah Code, oh dear. 74 00:06:28,020 --> 00:06:33,860 Excuse me. So under Utah Code 1020 and 75 00:06:36,650 --> 00:06:38,730 this is under number two of my 76 00:06:38,730 --> 00:06:39,730 I present to you today. 77 00:06:40,490 --> 00:06:44,970 It fits for the factors that actually constitute 78 00:06:45,630 --> 00:06:46,850 municipal land use. 79 00:06:48,290 --> 00:06:53,730 According to Title 10-20, these are the factors 80 00:06:54,530 --> 00:07:01,050 that a municipality is allowed to regulate under our zoning 81 00:07:01,830 --> 00:07:02,850 police power. 82 00:07:02,850 --> 00:07:03,530 I 83 00:07:06,090 --> 00:07:16,590 would like to take a minute to recognize that we're talking uses, density, open spaces, 84 00:07:17,760 --> 00:07:27,370 structures, buildings, energy efficiency, light and air, air quality, transportation and 85 00:07:27,370 --> 00:07:33,830 public oral, alternative transportation, infrastructure, street and building orientation, 86 00:07:33,830 --> 00:07:42,230 with requirements, public facilities, fundamental fairness, and land use regulation, and consideration 87 00:07:42,330 --> 00:07:48,210 of surrounding land uses to balance the foregoing purposes with the landowner's private 88 00:07:48,210 --> 00:07:52,670 property interests and associated statutory and constitutional protections. 89 00:07:53,510 --> 00:07:57,110 That is set forth as black letters state law. 90 00:07:58,590 --> 00:08:06,110 I'd also like to know that immigration canyon is very fortunate in the sense that you have 91 00:08:06,970 --> 00:08:16,050 one of the most, if not the most, thoughtful and sophisticated planning commission that I have ever worked with. 92 00:08:17,050 --> 00:08:25,330 And they do a great job of taking the very limited review of their authority that's set forth under Utah Code 93 00:08:25,330 --> 00:08:34,630 and thinking very critically and analytically about how to apply their limited 94 00:08:34,630 --> 00:08:40,470 purview authority to each of the proposed developments that comes before them. 95 00:08:41,550 --> 00:08:47,310 I also would like to note that the planning commission is extremely, you have a 96 00:08:47,310 --> 00:08:54,990 very ethical planning commission. They go to very great gains to comply with 97 00:08:54,990 --> 00:08:59,390 not only the Utah Municipal Employees and Ethics Act, 98 00:08:59,930 --> 00:09:03,050 which prevents any kind of rubber stamping 99 00:09:03,810 --> 00:09:08,070 or deliberating outside of an open meeting 100 00:09:08,070 --> 00:09:11,210 or making any decisions outside and open meeting, 101 00:09:11,570 --> 00:09:16,110 but they also do a wonderful job of complying 102 00:09:16,110 --> 00:09:19,530 with all of the provisions under the plan 103 00:09:19,530 --> 00:09:22,570 that are required by the planning commission under Title 10. 104 00:09:22,570 --> 00:09:32,950 And because of other planning commissions throughout the state of Utah, those prohibit 105 00:09:32,950 --> 00:09:40,390 their robust provisions regarding making decisions based on personal views, making decisions 106 00:09:40,390 --> 00:09:43,470 based on public clamor, and so forth. 107 00:09:44,110 --> 00:09:46,610 So you have a very ethical planning commission. 108 00:09:46,610 --> 00:09:57,730 And their purview of authority is set forth as set forth in number two by state code. 109 00:09:58,970 --> 00:10:05,470 The next kind of preliminary matter that I think will be useful is to know that the 110 00:10:05,470 --> 00:10:11,810 planning commission is a recommending body in this process. 111 00:10:11,810 --> 00:10:18,270 And they are a recommending body because development agreements are a legislative act. 112 00:10:19,250 --> 00:10:21,210 Not an administrative act. 113 00:10:21,530 --> 00:10:29,310 So a legislative act in land use, well really in otherwise, can only be finally approved 114 00:10:29,310 --> 00:10:32,010 by the legislative body. 115 00:10:32,170 --> 00:10:33,470 So that's going to be the city council. 116 00:10:34,070 --> 00:10:40,350 So what you'll see today is the planning commission making a recommendation either for approval 117 00:10:40,350 --> 00:10:47,770 or for denial and in either case with well certainly probably not denial with 118 00:10:47,770 --> 00:10:53,470 conditions but approval with conditions or suggestions for additional language 119 00:10:53,470 --> 00:11:03,150 that sort of thing. So just moving forward that's what we're that's the basis of 120 00:11:03,150 --> 00:11:08,810 which we're working today and it's pre-limited. So let's talk just for a 121 00:11:08,810 --> 00:11:16,450 second now about, oh, I am the master of my own slideshow and I didn't realize it. 122 00:11:16,710 --> 00:11:28,310 Okay. Because of the volume of the public comments that we received, which we very much, 123 00:11:28,430 --> 00:11:38,210 the city, I very much appreciate all of the input. I have summarized and I may not have 124 00:11:38,210 --> 00:11:45,290 I covered every single topic that was addressed in the public concerns, but I did my best 125 00:11:45,290 --> 00:11:50,390 to summarize the comments that we received. 126 00:11:52,250 --> 00:11:58,950 Overwhelmingly, the comments that we received were related to concerns about fire, danger, 127 00:11:59,630 --> 00:12:01,430 fire mitigation, and fire suppression. 128 00:12:02,870 --> 00:12:10,610 What I would like to note is getting back to our slide here about land use considerations. 129 00:12:11,610 --> 00:12:18,690 The international fire code, the international building code, health and safety codes are 130 00:12:18,690 --> 00:12:24,950 not within this group and there is a very good and legitimate reason for that. 131 00:12:24,950 --> 00:12:36,890 The good and legitimate reason for that is that the health and safety needs to be determined 132 00:12:36,890 --> 00:12:44,230 by the experts in keeping people alive and keeping people healthy. 133 00:12:44,230 --> 00:12:54,370 So health and safety codes are determined by the body that interprets 134 00:12:54,370 --> 00:12:58,770 and forces and enforces those. So in this case where there are concerns about 135 00:12:58,770 --> 00:13:08,930 fire, the body in all developments that will make a determination about what 136 00:13:08,930 --> 00:13:14,970 That fire risk there are what compliance with the international fire code looks like will 137 00:13:14,970 --> 00:13:24,370 be the fire departments that are that serve that respective development and the reason 138 00:13:24,370 --> 00:13:29,810 that that makes sense and just bear with me for a second is that not every planning commission 139 00:13:30,900 --> 00:13:36,690 I assure you is as thoughtful and sophisticated as immigration can in. 140 00:13:36,690 --> 00:13:47,090 And if land use as a consideration included a planning commission's ability to determine 141 00:13:48,810 --> 00:13:56,950 what a fire code means and whether or not it should be applied, then a planning commission 142 00:13:56,950 --> 00:14:05,690 would be able to say, I don't think it means that you have to have fire suppression equipment 143 00:14:05,690 --> 00:14:07,010 or sprinkling a system. 144 00:14:07,590 --> 00:14:09,270 We're not going to make that applicable here 145 00:14:10,030 --> 00:14:12,150 because this is a legislative act. 146 00:14:12,770 --> 00:14:15,030 And of course, that would not make any sense. 147 00:14:15,570 --> 00:14:18,770 And we would not want health and safety regulations 148 00:14:19,570 --> 00:14:24,390 to be legislatively made applicable in some way. 149 00:14:24,950 --> 00:14:28,690 So that is why the scope is so narrow. 150 00:14:29,690 --> 00:14:34,250 Now, it gets confusing because land use 151 00:14:34,250 --> 00:14:42,910 does absolutely include requirements to comply with all applicable health and safety codes. 152 00:14:43,790 --> 00:14:49,510 But land use is not in and of itself a health and safety code. 153 00:14:50,070 --> 00:14:52,830 It is a determination getting back here. 154 00:14:52,830 --> 00:14:59,850 According to state law, uses density, the determination of open space structure. 155 00:15:00,000 --> 00:15:25,600 Councillors, you know, very much in the urban planning realm. So to that end, please keep that in mind as you're making your comments as to the planning commission's actual ability to address your concerns. And what I would imagine would be a way that would be, you know, 156 00:15:26,400 --> 00:15:35,060 They have a limited ability, I guess, is my point, and just kind of going through the 157 00:15:35,060 --> 00:15:36,320 rest of the list quickly. 158 00:15:37,300 --> 00:15:44,060 We've got environmental protection, ecosystems, native vegetation, the scope of that 159 00:15:44,060 --> 00:15:50,000 review is going to be the state in terms of environmental protection that is not regulated 160 00:15:50,000 --> 00:15:53,640 by a municipality, building codes. 161 00:15:54,060 --> 00:15:56,460 That's going to be the International Building Code. 162 00:15:57,100 --> 00:15:59,300 Water source protection and water rights. 163 00:15:59,720 --> 00:16:03,840 Again, not regulated by a municipality 164 00:16:04,360 --> 00:16:06,960 within the context of the land use. 165 00:16:08,580 --> 00:16:10,140 OK, this is a big one. 166 00:16:11,000 --> 00:16:13,660 The access rights over private property. 167 00:16:13,660 --> 00:16:24,220 there is absolutely no authority of the city through land use to tell anyone to 168 00:16:24,220 --> 00:16:31,740 tell any private individual or grant or deny any rights in someone else's 169 00:16:31,740 --> 00:16:39,100 property that absolutely is barred. And here again for good reason, private 170 00:16:39,100 --> 00:16:47,040 property rights are completely separate and distinct from a municipal municipality to 171 00:16:47,040 --> 00:16:54,180 implemented police power to determine where residential houses should be located, where 172 00:16:54,180 --> 00:17:03,620 commercial uses should be located, and what all of those types of uses should look like 173 00:17:03,620 --> 00:17:06,100 and how they should be oriented and so forth. 174 00:17:06,100 --> 00:17:15,820 So to that end, what we will be discussing today absolutely does not grant the property 175 00:17:15,820 --> 00:17:23,280 owner any rights other than the uses that are set forth in the agreement, so absolutely 176 00:17:23,280 --> 00:17:32,840 no grant of rights on property that he does not own and to that end a denial, a recommendation 177 00:17:32,840 --> 00:17:44,780 for denial does not prevent the property owner from pursuing whatever rights he 178 00:17:45,420 --> 00:17:51,060 believes to have in private property that he does not own. So that's big 179 00:17:51,060 --> 00:17:58,060 clarification and then we have sanitation and there have been a lot of 180 00:17:58,060 --> 00:18:04,580 comments about the the problem is prior applications what we will deal with 181 00:18:04,580 --> 00:18:11,360 today is exclusively just what's in the agreement the plain language of what's 182 00:18:11,360 --> 00:18:15,360 being approved there and and then there was a big concern about sending 183 00:18:15,360 --> 00:18:20,640 the precedents and that's just not the way that the development agreements work 184 00:18:20,640 --> 00:18:25,900 and and we will talk about just quickly development agreements as a tool the 185 00:18:25,900 --> 00:18:32,220 The development agreements are also authorized under state code and basically the mirror of 186 00:18:32,220 --> 00:18:37,720 that state code has been implemented in immigration can you code, excuse me, enacted rather. 187 00:18:38,520 --> 00:18:44,540 And what a development agreement is, it's a tool that is used by municipalities where 188 00:18:45,300 --> 00:18:50,880 you see, we've got the scope of our purview with land views. 189 00:18:50,880 --> 00:18:55,920 And just a couple, I can't enter it last year, the year before. 190 00:18:56,600 --> 00:18:59,660 I don't recall, but for example, the legislature 191 00:19:00,660 --> 00:19:03,380 slashed the municipality's ability 192 00:19:03,380 --> 00:19:07,740 to impose design standards on single-family residences. 193 00:19:09,850 --> 00:19:11,250 A big blow, right? 194 00:19:12,110 --> 00:19:16,010 So what a development agreement has the flexibility to do 195 00:19:17,050 --> 00:19:21,130 is to say, okay, we have a developer coming in 196 00:19:21,130 --> 00:19:29,450 would like to build something and they need a they are not going to be able to make the setback 197 00:19:29,450 --> 00:19:38,750 requirement from the side yard in accordance with our code. It gives the city the ability to say 198 00:19:38,750 --> 00:19:45,550 all right on our priority list of of what kind of development we'd like to achieve. 199 00:19:47,840 --> 00:19:48,540 Do we have 200 00:19:48,540 --> 00:19:58,380 opportunity here to say, you know what, we're going to give you, we're going to allow you to build within the step back whatever that means. 201 00:19:58,800 --> 00:20:09,680 But in exchange for that, you're going to implement the following design standards, which we would not otherwise be able to do under our own language regulations. 202 00:20:09,680 --> 00:20:15,400 So that's why development agreements are such an important tool for municipalities. 203 00:20:16,180 --> 00:20:23,140 This is brand new for immigration union because the city is still in its infancy. 204 00:20:23,820 --> 00:20:31,520 We're in our formative years, so to speak, but they are very, very common and very frequently 205 00:20:31,520 --> 00:20:35,960 used by all of the other cities in the valley for exactly this reason. 206 00:20:35,960 --> 00:20:39,580 So, that is what a development agreement does. 207 00:20:39,820 --> 00:20:47,400 Oh, and the development agreement, specifically this development agreement, addresses land use approvals only. 208 00:20:48,400 --> 00:20:53,900 So, all it is being approved in this development agreement are the uses that are being proposed. 209 00:20:55,020 --> 00:21:08,990 And the additional regulations that we could not require under our existing tone essentially. 210 00:21:09,630 --> 00:21:13,430 So let's go through what those are. 211 00:21:15,350 --> 00:21:19,330 Well, we've got, I think, the purpose of the course of recreation zones, 212 00:21:19,330 --> 00:21:23,430 which I imagine everybody is familiar with. 213 00:21:23,430 --> 00:21:30,170 But, we have a forest activity plan that was also posted, and that was prepared by 214 00:21:30,790 --> 00:21:37,210 the Department of Natural Resources in the Division of Forestry by our state lands. 215 00:21:38,530 --> 00:21:47,630 So the use for this property is being approved as conservation management of forestry. 216 00:21:47,630 --> 00:22:11,590 And those uses within the plan, or excuse me, the activities within the plan in terms of fire mitigation practices or soil rejuvenation have already been approved under the property owner's permitted use application. 217 00:22:11,590 --> 00:22:23,110 Claremont was out approved last October yes so those and the reason for that is 218 00:22:23,110 --> 00:22:30,870 because there's nothing in immigration canyon code that restricts conservation 219 00:22:30,870 --> 00:22:37,530 activities and the other reason is that from due guidance from the Utah 220 00:22:37,530 --> 00:22:45,450 on budget's office, those activities would not likely constitute development such 221 00:22:45,450 --> 00:22:52,410 that the F cause requirements and the rest of our zoning regulations would be triggered. 222 00:22:53,390 --> 00:23:02,770 However, we have additional activities that were proposed under the permitted use application 223 00:23:02,770 --> 00:23:08,570 that the city did not approve and those additional activities are basically 224 00:23:08,570 --> 00:23:17,930 boiled down to non-habitable structures, beekeeping, the installation of a 225 00:23:17,930 --> 00:23:25,110 solar array and some biochar operations. The development agreement goes through 226 00:23:25,110 --> 00:23:30,650 and addresses the non-habitable structures. In accordance with immigration 227 00:23:30,650 --> 00:23:31,630 can be in code. 228 00:23:33,890 --> 00:23:39,790 Accessory uses and structures customarily incidental to a permitted use are 229 00:23:39,790 --> 00:23:47,430 allowed. So we have the conservation activities as the permitted use and the non-habitable structures 230 00:23:47,960 --> 00:23:56,350 are being proposed as an accessory to that use. And we can rule if there's questions about 231 00:23:56,350 --> 00:23:58,750 of the concept plan, we can address those, 232 00:23:59,550 --> 00:24:02,670 but the, excuse me, from the planning commission, 233 00:24:03,730 --> 00:24:06,510 I'm not sure I'll be able to pull it up, I will try. 234 00:24:07,090 --> 00:24:08,590 The next is we keeping, 235 00:24:09,030 --> 00:24:11,030 and we keeping is actually 236 00:24:11,850 --> 00:24:16,190 a completely regulated by the state of Utah. 237 00:24:17,170 --> 00:24:20,830 And municipalities are preempted entirely 238 00:24:21,370 --> 00:24:22,810 from the regulation of these, 239 00:24:22,810 --> 00:24:28,730 except under some very narrow exceptions that here again the immigration 240 00:24:28,730 --> 00:24:34,750 canning code does not include. Next we have the solar array and the development 241 00:24:34,750 --> 00:24:41,610 agreement addresses a very specific and regulations for the solar array, here 242 00:24:41,610 --> 00:24:48,990 again that are not included in our code, as well as the biochar, which I know is 243 00:24:49,810 --> 00:24:55,310 the biggest concern, and I'm going to let the applicant talk a little bit more about 244 00:24:55,310 --> 00:25:00,810 that, but what I will say right off the bat is that, and I have taken too much time 245 00:25:00,810 --> 00:25:03,570 when I apologize, I'm going to go through more quickly now. 246 00:25:03,850 --> 00:25:08,730 What I will say about that is that it's limited to three days a year, and that it is very, 247 00:25:08,810 --> 00:25:15,870 very heavily regulated by the division of forestry, fire and state lands. 248 00:25:15,870 --> 00:25:23,230 As a matter of fact, they have to be on site to supervise, and there are very specific 249 00:25:23,230 --> 00:25:30,010 requirements regarding defensible space that's non-clamable, etc., which is addressing 250 00:25:30,010 --> 00:25:30,770 the development agreement. 251 00:25:30,970 --> 00:25:31,210 All right. 252 00:25:31,370 --> 00:25:32,630 I'm really going to hurry now. 253 00:25:32,890 --> 00:25:33,890 I am so sorry, Chair. 254 00:25:36,310 --> 00:25:43,830 Let's talk about restrictions and regulations for this point forward under this agreement. 255 00:25:45,010 --> 00:25:51,830 The property owner is waving his right to commercial logging or lumber processing. 256 00:25:52,270 --> 00:25:54,810 That will never occur on this property. 257 00:25:55,430 --> 00:26:01,350 Mineral extraction and processing, the keeping or raising of domestic animals or foul, 258 00:26:01,810 --> 00:26:07,870 except for household pets or family food production, retail facilities, 259 00:26:07,870 --> 00:26:13,410 old year. Sorry, we taught facilities to open a general public multi-family or 260 00:26:13,410 --> 00:26:20,130 willing group uses ski resorts and then we still have on the books and I'm 261 00:26:20,130 --> 00:26:24,150 not, please don't ask me what it is because I will be able to tell you underground 262 00:26:24,150 --> 00:26:31,830 record storage vaults. Moving on, the property owner and here again getting 263 00:26:31,830 --> 00:26:34,490 In fact, to our discussion about what land use 264 00:26:35,150 --> 00:26:35,990 it comes to. 265 00:26:36,430 --> 00:26:39,150 I'm sorry to interrupt, but on that waiver, 266 00:26:39,410 --> 00:26:41,990 that waiver is only during the term of this agreement, 267 00:26:42,610 --> 00:26:45,730 which can be terminated by the land on a group note. 268 00:26:46,810 --> 00:26:49,590 Excuse me, we need to allow the presentation. 269 00:26:50,210 --> 00:26:52,610 No, we can't say that it's waived forever. 270 00:26:52,730 --> 00:26:54,030 Sir, that's simply incorrect. 271 00:26:54,510 --> 00:26:54,650 Please. 272 00:26:55,930 --> 00:26:56,970 Can you address that at all? 273 00:26:57,390 --> 00:26:57,690 Sure. 274 00:26:58,270 --> 00:26:59,890 Yes, that is the language of the agreement 275 00:26:59,890 --> 00:27:02,990 where if it is terminated, then it would be released. 276 00:27:04,330 --> 00:27:05,170 But there's very specific. 277 00:27:05,170 --> 00:27:06,170 So you correct that statement. 278 00:27:06,390 --> 00:27:07,070 It's not way through. 279 00:27:07,370 --> 00:27:07,430 Right? 280 00:27:07,710 --> 00:27:08,310 It's way through. 281 00:27:08,450 --> 00:27:12,650 Well, to the subject to the termination provisions, yes. 282 00:27:13,230 --> 00:27:15,890 Like the termination provisions are. 283 00:27:17,450 --> 00:27:18,450 7.2. 284 00:27:18,670 --> 00:27:19,410 Yes, that's right. 285 00:27:20,030 --> 00:27:23,410 And I've got that in here. 286 00:27:26,820 --> 00:27:27,420 Right. 287 00:27:28,660 --> 00:27:29,400 Which one? 288 00:27:29,400 --> 00:27:31,640 survive with the so 289 00:27:38,240 --> 00:27:42,320 is it really terminates because there's no vested rights at all except 290 00:27:42,320 --> 00:27:56,200 what he's already built he gets a key that's right that's right this is not the public 291 00:27:56,200 --> 00:28:03,480 here you can get so you can make that point as well during the public hearing portion please 292 00:28:03,480 --> 00:28:08,180 you can make that comment in my hearing the public hearing so she gets an 293 00:28:08,180 --> 00:28:11,960 unlimited amount of time to provide this information and I get three minutes to 294 00:28:11,960 --> 00:28:16,660 correct it. This isn't important. Just please. He's just wrong about this. 295 00:28:19,040 --> 00:28:20,340 We have 296 00:28:20,340 --> 00:28:29,000 reviewed revisions to our Title 19 where that is waiting at the City Council 297 00:28:29,000 --> 00:28:35,560 a level that has been recommended where we have eliminated the uses that have been set 298 00:28:35,560 --> 00:28:41,980 for it. So what that means is when the agreement terminates, all of the vested rights have 299 00:28:41,980 --> 00:28:46,580 terminated. We'll terminate with it. And the property under which we subject to then 300 00:28:47,240 --> 00:28:55,900 effective ordinances, which given the revisions that we recommended to Title 19 will not include 301 00:28:55,900 --> 00:29:02,700 those uses and you're right I should have heard like that and I apologize because that title 302 00:29:02,700 --> 00:29:09,620 bank team has not been fully legislated through the city council yet and that was knowledge 303 00:29:09,620 --> 00:29:15,760 that I had that you did not have and I apologize for not making that verification. 304 00:29:16,460 --> 00:29:25,800 So to the extent that, again, that's the plan is to finish that title of the... 305 00:29:25,800 --> 00:29:26,520 Let's not finish. 306 00:29:27,180 --> 00:29:27,780 That's true. 307 00:29:28,460 --> 00:29:33,780 So you're recommending us executing this agreement and there's a potential that this is 308 00:29:33,780 --> 00:29:36,340 going to pass the book to help everyone use it. 309 00:29:37,640 --> 00:29:40,680 Why is it there a condition in the agreement? 310 00:29:40,680 --> 00:29:47,720 They will be prohibited under the agreement and then prior to the agreement's 311 00:29:47,720 --> 00:29:50,600 termination we will have updated Title IX. 312 00:29:50,720 --> 00:29:51,320 How do you know that? 313 00:29:51,500 --> 00:29:52,440 He can terminate tomorrow. 314 00:29:53,620 --> 00:29:56,340 He can terminate the upon written notice to the city. 315 00:29:56,460 --> 00:29:58,240 That's what you fundamentally don't understand. 316 00:29:59,260 --> 00:29:59,520 Right? 317 00:30:00,000 --> 00:30:28,500 So you can terminate it prior to the passage of this tunnel. Sir, I need to ask that you do that during your two minutes later on if you want to pursue that point. We need to continue. We're very difficult time constraint. We have a hard stop at 10.30. We need time to have everybody comment as well as the commission to deliberate on this point. So would you just please continue? We took five minutes to say how ethical the committee is and how great everybody is. We get that time back to talk about the real issues. 318 00:30:30,430 --> 00:30:33,050 with respect in my time. I've got a job. 319 00:30:33,750 --> 00:30:37,630 Yes, sir. I would be more than happy to talk with you. 320 00:30:37,830 --> 00:30:39,690 I called you yesterday and you didn't return my call. 321 00:30:41,350 --> 00:30:45,570 Yes, no, I'm sorry. I was dealing with other 322 00:30:46,430 --> 00:30:50,130 business for other cities. And I'm sorry that I could not get back to you. 323 00:30:50,410 --> 00:30:54,150 But I can, and I will. I just couldn't do it yesterday. 324 00:30:54,670 --> 00:30:56,770 I can and I will. And I have to be great. 325 00:30:56,770 --> 00:31:06,710 thank you. The next I talked to you about overnight stays with regards to without 326 00:31:06,710 --> 00:31:10,870 an approved sanitation plan we have defensible space required for the solar 327 00:31:10,870 --> 00:31:18,130 array project structures and accordance with the concept plan and I'm just 328 00:31:18,130 --> 00:31:22,230 going to jump now right to and I apologize for the time that I take in the staff 329 00:31:22,230 --> 00:31:25,410 recommendation that we approve the 330 00:31:25,410 --> 00:31:28,390 conservation development agreement and the 331 00:31:28,390 --> 00:31:33,050 reason the reasons for that set forth is from the 332 00:31:33,050 --> 00:31:37,050 limited purview of what we can consider under 333 00:31:37,050 --> 00:31:41,650 land use under state law. The the intensity of 334 00:31:41,650 --> 00:31:48,430 the use is is such that it is actually less than 335 00:31:48,430 --> 00:31:51,670 what the other permitted uses are under the 336 00:31:51,670 --> 00:31:58,750 forestry zone. It's a it's a minimally intense use and the structures because they will be 337 00:31:58,750 --> 00:32:06,030 non habitable are also minimally intense. The agreement will be it recorded against the 338 00:32:06,030 --> 00:32:13,770 property and subject to termination. It's recorded against the property and a new property 339 00:32:13,770 --> 00:32:20,170 donor would not be able to change the use without coming to amend the development agreement. 340 00:32:21,410 --> 00:32:27,990 The agreement includes certain restrictions and enforcement mechanisms also that would 341 00:32:27,990 --> 00:32:33,190 be otherwise unavailable to the city and those are incorporated in there. 342 00:32:34,410 --> 00:32:40,330 And I appreciate your time and I know that we're going to wait until the end for planning 343 00:32:40,330 --> 00:32:48,990 questions but to the extent I'm happy to what it's at the chair's pleasure. Thank you 344 00:32:48,990 --> 00:32:53,150 Cliff. I appreciate that. I think in the interest of time we'll move on to the 345 00:32:53,150 --> 00:32:58,770 second portion which is the applicant. Mr. Lake we appreciate if you keep your 346 00:32:58,770 --> 00:33:04,050 comments to less than 15 minutes so we have more time to discuss and deliver it. 347 00:33:04,750 --> 00:33:09,830 Absolutely yes, it's going over here so I can talk both ways. 348 00:33:10,590 --> 00:33:13,550 All right, thank you commission for your time today. 349 00:33:14,350 --> 00:33:20,030 I know that I've been here presenting this in the past, so I try to make this new information 350 00:33:20,030 --> 00:33:22,310 and that repeat would have been done previously. 351 00:33:23,310 --> 00:33:27,770 But there is a little bit of overlap just for background for those that are not familiar with the application. 352 00:33:27,770 --> 00:33:32,030 So, this is a partial property that I bought approximately six years ago. 353 00:33:32,530 --> 00:33:39,450 My interests here are really to operate a permaculture farm, low-impact, and nothing 354 00:33:39,450 --> 00:33:42,530 large-scale or industrial in nature. 355 00:33:43,330 --> 00:33:49,070 For me, it's a passion of mine, watershed education, as well as agriculture, not going 356 00:33:49,070 --> 00:33:53,310 for agriculture family, but also for recreation, right, and that's really what the forest and 357 00:33:53,310 --> 00:33:54,610 recreation zones intended for. 358 00:33:55,710 --> 00:33:59,990 And so I already allow private recreational use, but I want to be able to show that you 359 00:33:59,990 --> 00:34:04,710 can have dual use, that you can use this for productive agricultural use conservation 360 00:34:04,710 --> 00:34:09,190 efforts, and that at the management of the land is better than doing nothing at all. 361 00:34:10,410 --> 00:34:13,710 So I think there's a lot of shared objectives that are accomplished through this application. 362 00:34:14,230 --> 00:34:18,470 These are things that presented in the past, foremost for me is that watershed production. 363 00:34:18,470 --> 00:34:22,990 But also the wildfire mitigation risk is very important as well. 364 00:34:24,170 --> 00:34:25,750 There are a lot of fuels up there. 365 00:34:25,950 --> 00:34:29,890 I know this is a small part of land at the part that I'm talking about developing is 366 00:34:29,890 --> 00:34:30,650 even smaller, right? 367 00:34:30,730 --> 00:34:33,630 We're really looking at a seminary acre parcel of the full 40 acres. 368 00:34:34,390 --> 00:34:38,990 But that is a very sensitive watershed area where a lot of fuels are. 369 00:34:39,770 --> 00:34:43,510 And so active management of that part of the property can have some real benefit I believe. 370 00:34:43,510 --> 00:34:49,050 At the same time, I want to minimize the impact of that watershed and physical disturbance 371 00:34:49,050 --> 00:34:52,310 to the natural landscape. 372 00:34:53,590 --> 00:34:55,850 So I think it's important to understand how we got here, right? 373 00:34:55,950 --> 00:34:57,610 This is a long time in the process. 374 00:34:58,190 --> 00:35:04,210 Back in March of 2021, when I first purchased the property, I submitted a permitted use application. 375 00:35:04,970 --> 00:35:10,570 And with permitted use, as the commission is aware, if it meets the requirements, then 376 00:35:10,570 --> 00:35:12,730 and it's permitted, you can go through and do that. 377 00:35:13,310 --> 00:35:16,630 For agricultural use, which at the time was part of the code 378 00:35:16,630 --> 00:35:17,790 as a permitted use. 379 00:35:18,490 --> 00:35:22,090 I actually believe still is today the code also said 380 00:35:22,090 --> 00:35:23,610 that you didn't even need to use permit 381 00:35:23,610 --> 00:35:25,130 in order to do agricultural use, 382 00:35:25,210 --> 00:35:28,010 because historically that's what immigration can use use for, 383 00:35:28,110 --> 00:35:29,690 including this property for 100 years. 384 00:35:31,070 --> 00:35:32,590 In September of 2022, 385 00:35:32,590 --> 00:35:36,090 I missed the issue to determination acknowledging that. 386 00:35:36,250 --> 00:35:38,910 The agricultural use was exactly the way I used permit review, 387 00:35:38,910 --> 00:35:43,150 but that any development in structures must comply with F cause ordinance. 388 00:35:43,690 --> 00:35:49,890 And it put me in this really weird position where by state co-agricultural structures don't need a built-in permit. 389 00:35:50,410 --> 00:35:53,430 So there's really no process to go through a review forum. 390 00:35:53,970 --> 00:35:58,290 Essentially, it was doing an F cause review without needing any built-in permit review. 391 00:35:58,870 --> 00:36:05,670 And so we went through years of iterations and multiple, you know, rounds of staff and agency review, 392 00:36:05,670 --> 00:36:09,510 You're not just MSD, but all the different agencies that have over sent with the help 393 00:36:09,510 --> 00:36:11,330 and safety and fire that Claire had mentioned. 394 00:36:11,990 --> 00:36:15,750 And eventually MSD issued a determination that finding that the conservation activities 395 00:36:15,750 --> 00:36:20,190 and beekeeping were allowed, but that the structures were not approved. 396 00:36:20,950 --> 00:36:26,350 And so that, I appealed that decision in a timely appeal, that's really kind of what brings us 397 00:36:26,350 --> 00:36:27,050 to where we're right today. 398 00:36:28,250 --> 00:36:33,370 So well, to be, to be accurate, the development agreement is a discretionary approval, right? 399 00:36:33,370 --> 00:36:38,630 to say yes or no decision, the planning commission doesn't have any obligation to approve it. 400 00:36:38,990 --> 00:36:44,990 However, it's kind of an a raw A or a raw B decision because the appeal is open, and 401 00:36:44,990 --> 00:36:48,910 so if the development agreement doesn't go forward, then we essentially just go back to 402 00:36:48,910 --> 00:36:49,550 the appeal process. 403 00:36:50,330 --> 00:36:54,870 And we leave the decision to a land use hearing officer to apply the plan meeting of the law, 404 00:36:55,230 --> 00:36:58,710 which in this case, an under title like team, there isn't a lot of guidance, right? 405 00:36:58,870 --> 00:37:03,090 And so both the city and I decided, we want to go through this development agreement process 406 00:37:03,090 --> 00:37:06,410 is because we can put conditions in place that as Claire said, 407 00:37:06,570 --> 00:37:07,630 don't exist in code, right? 408 00:37:08,010 --> 00:37:09,750 There's really kind of a large gap in code 409 00:37:09,750 --> 00:37:11,730 when it comes to the existing land use rights 410 00:37:12,410 --> 00:37:14,650 and then that gap that's in Title 19 411 00:37:15,510 --> 00:37:16,810 because these are permitted, 412 00:37:17,010 --> 00:37:19,190 but there really are standards for how they are permitted 413 00:37:19,190 --> 00:37:20,310 or how it should be oversaw. 414 00:37:20,630 --> 00:37:22,510 We need to have something in place that controls. 415 00:37:23,170 --> 00:37:25,270 Because without that, there really isn't a lot of guidance 416 00:37:25,730 --> 00:37:27,950 for me to understand what is allowed and what is not allowed. 417 00:37:28,170 --> 00:37:30,270 So in trying to implement this, 418 00:37:30,270 --> 00:37:36,770 Well, what was it for the city would say we can't do that but there was nowhere for the city to point to say that 419 00:37:36,770 --> 00:37:42,570 It couldn't do that because it wasn't in 1019 so for me the development gear would give me clarity to know what is a lot 420 00:37:42,570 --> 00:37:47,190 And what is not what it's putting it all in writing so that there's no ambiguity for the city provides conditions 421 00:37:47,190 --> 00:37:51,610 That they can oppose on me that wouldn't otherwise be allowed under either encode or 422 00:37:53,130 --> 00:37:59,410 Elsewhere, so it really fills the gap to create site specific standards that don't apply to the entire canyon or the entire 423 00:37:59,410 --> 00:38:05,930 of our 20 zone, they apply just to this, really this few acres within my land. 424 00:38:07,470 --> 00:38:12,570 So, to delete active management benefits, the whole canyon, as we pointed out, this 425 00:38:12,570 --> 00:38:17,690 is not my plan, necessarily, but it's a plan that's been developed by the state using 426 00:38:17,690 --> 00:38:22,510 federal funds that show how forest should be managed professionally. 427 00:38:23,050 --> 00:38:26,950 There's oversight from the state, the state rights the plan by coming on site, looking 428 00:38:26,950 --> 00:38:31,830 it the existing conditions and make a recommendation for each stand should be managed and do what 429 00:38:31,830 --> 00:38:38,390 densely. The idea here is to keep a healthy forest that doesn't require as much water so the 430 00:38:38,390 --> 00:38:44,630 existing trees have enough to be able to stay and resist disease and make them more resilient 431 00:38:44,630 --> 00:38:50,110 to fire. So the active fuel reduction reduces risk for neighboring properties. It also protects 432 00:38:50,110 --> 00:38:55,650 the drinking water in the watershed. I've done projects for invasive species control while 433 00:38:55,650 --> 00:39:00,450 let habitat restoration, water and soil erosion mitigation, those are all parts of the plan 434 00:39:00,990 --> 00:39:06,450 that I have funded with federal funds at an employment. And what it does, it's a 10-year 435 00:39:07,850 --> 00:39:12,410 forestry plan that's implemented by the state and over-sale by the state with on-site residents. 436 00:39:13,550 --> 00:39:19,670 So, as I mentioned, UFA still remains full regulatory authority overall. Structures, 437 00:39:20,450 --> 00:39:25,090 this agreement really simplifies the federal code, it doesn't replace it, so we're adding to that. 438 00:39:25,090 --> 00:39:29,690 Some of the examples you can see that are in the development agreement are here. 439 00:39:30,210 --> 00:39:32,710 Well, it complies with the wooie code. 440 00:39:33,270 --> 00:39:35,130 Again, there's a lot of state exemption. 441 00:39:35,370 --> 00:39:38,090 And even under wooie, there's exemption for agricultural structures. 442 00:39:38,370 --> 00:39:39,590 Or a lot of this wouldn't have to park. 443 00:39:40,050 --> 00:39:44,250 Now agricultural structure for that extremely high risk fire danger area 444 00:39:44,830 --> 00:39:48,910 should have some kind of restrictions or some kind of compliance. 445 00:39:49,430 --> 00:39:52,050 And so those are volatile and put into those development agreements 446 00:39:52,050 --> 00:39:54,170 such as the class-wood ignition resets of construction, 447 00:39:54,930 --> 00:39:56,910 defensible space that wouldn't otherwise apply. 448 00:39:58,350 --> 00:39:59,930 And then there's additional structures, 449 00:40:00,910 --> 00:40:02,710 sorry, additional conditions for structures 450 00:40:02,710 --> 00:40:04,150 that are over a six-centred square feet 451 00:40:04,150 --> 00:40:06,950 that make it even higher, which is the threshold 452 00:40:06,950 --> 00:40:07,950 that is set by a whirlwind. 453 00:40:09,650 --> 00:40:12,990 So as Claire mentioned, she went through all the different concerns. 454 00:40:12,990 --> 00:40:16,070 I categorized them more down into four different concerns 455 00:40:16,450 --> 00:40:18,750 are on fire, public safety, water, environmental, 456 00:40:19,550 --> 00:40:20,750 neighborhood impacts, and access. 457 00:40:20,750 --> 00:40:24,590 We're going to go through all of these and surely hear them from the public. 458 00:40:25,050 --> 00:40:31,190 I want to try to address how the development agreement tries to address these concerns. 459 00:40:31,970 --> 00:40:34,830 So we already mentioned that the Ruby standards for class wedding 460 00:40:34,830 --> 00:40:42,910 initially is construction, defensual space, the plan that's been developed by DFSSL 461 00:40:42,910 --> 00:40:49,910 and how they'll be onsite to monitor and supervise the application of any biochar 462 00:40:49,910 --> 00:40:54,070 birds and the fire suppression equipment that's required to be stored on site. 463 00:40:54,670 --> 00:40:58,470 When it comes to water and environmental, all of the requirements will still need to 464 00:40:58,470 --> 00:41:03,430 go through EAD, Division of Water Rights, Health Department, Armored Corps of Engineers, 465 00:41:03,990 --> 00:41:06,250 all the existing agencies that have jurisdiction. 466 00:41:07,450 --> 00:41:11,930 When it comes to the neighborhood impact, we've highly restricted commercial timber operations 467 00:41:11,930 --> 00:41:18,850 animal enterprises, insect retail, and habitable structures to create as minimal of an impact 468 00:41:19,710 --> 00:41:26,770 as possible. There's high restrictions on storage of any kind of waste, lighting, and really 469 00:41:26,770 --> 00:41:30,670 my goal with all of this is that when you look at the property, you're not going to see anything, 470 00:41:30,910 --> 00:41:36,290 right? From any viewpoint of the canyon, this will all be shielded from the structures geographically 471 00:41:36,290 --> 00:41:41,170 because it's essentially a big bolt, so there's terrain that's in the way that would impact any of 472 00:41:41,170 --> 00:41:45,350 the light pollution or any kind of noticeable development. 473 00:41:46,130 --> 00:41:48,030 When it comes to access, as Claire mentioned, 474 00:41:48,210 --> 00:41:50,190 this really doesn't address motor vehicle access. 475 00:41:50,710 --> 00:41:53,550 What we're trying to do is mitigate the need for it 476 00:41:53,550 --> 00:41:55,790 by limiting the intensity and imposing 477 00:41:55,790 --> 00:41:58,230 those additional public safety safeguards. 478 00:41:59,410 --> 00:42:01,150 And then it doesn't eliminate these concerns, 479 00:42:01,150 --> 00:42:03,570 but it kind of converts them into standards, limitations, 480 00:42:04,270 --> 00:42:05,490 and agency oversight. 481 00:42:07,350 --> 00:42:09,630 So with the staff recommendation that Claire 482 00:42:09,630 --> 00:42:14,470 are already mentioned. You know, when I look at this, I think the development agreement 483 00:42:15,330 --> 00:42:22,350 is a way to put additional conditions on this property that otherwise can be. And it's 484 00:42:22,350 --> 00:42:28,190 really a choice of do we want to go down the road of allowing the land use hearing officer 485 00:42:28,190 --> 00:42:33,930 to decide whether this needs existing code without any conditions, or that we can come together 486 00:42:33,930 --> 00:42:38,090 and have an agreement that we both agree on 487 00:42:38,090 --> 00:42:39,830 that will resolve the concerns. 488 00:42:40,870 --> 00:42:42,730 And so while it is a yes or no vote, 489 00:42:43,310 --> 00:42:45,450 I know vote means that we essentially just go back 490 00:42:45,450 --> 00:42:47,610 to the default process, which is that appeal process. 491 00:42:48,210 --> 00:42:50,390 And I did put in here permanent and bold 492 00:42:50,390 --> 00:42:52,210 for the same point that Clark pointed out. 493 00:42:52,990 --> 00:42:54,750 Yes, this agreement can be terminated, 494 00:42:54,970 --> 00:42:57,510 but the plan is to update 10 on 19 495 00:42:57,510 --> 00:42:59,230 which you've been working in for three years now. 496 00:42:59,810 --> 00:43:03,230 And a lot of these uses, including agriculture use, 497 00:43:03,230 --> 00:43:07,490 will be removed. So if this agreement is ever terminated, why don't we just do that 498 00:43:07,490 --> 00:43:12,550 a chance to go back to them and we can't do these things. Sir, please, Mr. 499 00:43:12,790 --> 00:43:18,110 like how are you going to answer this? Please, that is my kind of order, sir, please. I can't ask 500 00:43:18,110 --> 00:43:23,310 you. No, no, no, you don't want to. No, please sit down. Any questions? Just like please, 501 00:43:23,390 --> 00:43:24,850 officer. How are you going to access the problem? 502 00:43:26,890 --> 00:43:27,770 No, really, how are you going to 503 00:43:27,770 --> 00:43:30,890 access the property? Mr. Lee, are you done with your presentation? 504 00:43:30,890 --> 00:43:35,150 Thank you very much for using your time more. 505 00:43:36,090 --> 00:43:42,110 We are now prepared to go to the public hearing portion of the meeting. 506 00:43:42,650 --> 00:43:46,130 Do I have a motion from the planning commission to open the public hearing? 507 00:43:46,610 --> 00:43:48,210 I'll make a motion to open the public hearing. 508 00:43:48,830 --> 00:43:49,770 Motion, second. 509 00:43:50,110 --> 00:43:50,630 Second. 510 00:43:50,830 --> 00:43:51,350 Any discussion? 511 00:43:53,270 --> 00:43:53,730 Hearing none. 512 00:43:54,450 --> 00:43:55,330 Paul, here at PCI. 513 00:43:55,730 --> 00:43:56,970 Oh, hang on, hang on. 514 00:43:56,970 --> 00:44:00,090 before the public hearing at the beginning of the public hearing. 515 00:44:00,370 --> 00:44:01,910 I'll take care. 516 00:44:03,950 --> 00:44:05,130 All in favor? 517 00:44:05,310 --> 00:44:05,750 Please say aye. 518 00:44:05,930 --> 00:44:06,190 Aye. 519 00:44:06,570 --> 00:44:06,710 Aye. 520 00:44:07,890 --> 00:44:09,090 It passes unanimously. 521 00:44:09,690 --> 00:44:10,110 Thank you. 522 00:44:10,730 --> 00:44:15,770 All right, for the public hearing, what we'd like to do is limit comments to two minutes 523 00:44:15,770 --> 00:44:17,670 because there's such a large crowd here. 524 00:44:18,350 --> 00:44:23,050 We do not know what it's up to the chair. 525 00:44:23,750 --> 00:44:24,970 Why would you limit it? 526 00:44:24,970 --> 00:44:26,850 Please, sir, here are the order at this point. 527 00:44:27,790 --> 00:44:29,390 You'll get you two minutes if you wish. 528 00:44:30,210 --> 00:44:32,450 What I'd like to do is learn it to two minutes 529 00:44:32,450 --> 00:44:35,730 so that we have time to hear as many people as possible. 530 00:44:36,350 --> 00:44:39,450 We will need to close the public hearing 531 00:44:39,450 --> 00:44:42,550 so that we will have time to have a commission discussion. 532 00:44:43,650 --> 00:44:46,730 We have in the audience, a member of our city council, 533 00:44:46,990 --> 00:44:51,130 Ren Harris, she has requested to speak first. 534 00:44:51,130 --> 00:44:54,030 and I would like to recognize this hair. 535 00:44:56,270 --> 00:44:59,750 And while she's coming up, do we have the sign-in sheets? 536 00:45:01,780 --> 00:45:30,200 Has everyone had an opportunity to sign in? If not, please do so. Thank you. Thank you. Mr. Chair, everyone, I'll try to use my now two minutes wisely. I had requested that I be given some consideration as a visiting official. You all know that I am a member of the city council. I did have a statement prepared to address 537 00:45:30,200 --> 00:45:39,960 And to support the Planning Commission saying that there have been a lot of rumors insinuating 538 00:45:39,960 --> 00:45:50,320 that there is some back room plan dealing going on and I have received so many comments 539 00:45:50,320 --> 00:45:56,780 but to synthesize them that this is basically a done deal that is even considered. 540 00:45:56,780 --> 00:46:03,660 I have pushed back against that, at every opportunity I am constrained by the fact that I cannot 541 00:46:03,660 --> 00:46:09,740 mention the things that Ms. Gilmore mentioned about why this is even being considered. 542 00:46:11,700 --> 00:46:16,780 I can't make those statements at this point because of two things that have happened in this. 543 00:46:16,960 --> 00:46:25,700 I will say that I do not know any council members who have either knowingly or unwittingly acted 544 00:46:26,980 --> 00:46:31,660 in a way to influence the planning commission and that is something you know 545 00:46:31,660 --> 00:46:37,960 this this body works so hard they have done such great work. I can't say 546 00:46:37,960 --> 00:46:42,680 enough good things about the planning commission. I also welcome Mr. 547 00:46:42,860 --> 00:46:49,580 Leib to use his property as immigration king and ordinances provide. I'm in no 548 00:46:49,580 --> 00:46:53,700 way trying to say that he can't do that but where two things happen today that 549 00:46:54,280 --> 00:47:01,200 Make me look like a little bit of a fool for trying to say that this is being considered 550 00:47:01,200 --> 00:47:02,580 in an open and public way. 551 00:47:02,740 --> 00:47:07,840 The first is that Ms. Gilmore admitted that the CDA were considering today, which is 552 00:47:07,840 --> 00:47:11,860 supposed to take into account the benefit of the community. 553 00:47:12,460 --> 00:47:19,100 It's predicated on a modification of our existing ordinances that's going to be considered in an 554 00:47:19,100 --> 00:47:26,680 upcoming meeting and that none of the currency counsel people even know about. So that makes 555 00:47:26,680 --> 00:47:31,560 it, you know, more challenging for me to accept that there isn't something going on. 556 00:47:31,900 --> 00:47:35,820 Ren, your time's up and if we let you go longer, then we have to let everybody else go longer. 557 00:47:35,940 --> 00:47:44,020 She can have my time. Okay. Thank you. I appreciate that. I will take less than that. Mr. 558 00:47:44,020 --> 00:47:46,960 Mr. Light just said that he and the city agreed to this CDA. 559 00:47:47,580 --> 00:47:54,740 The City Council has not, all caps there, agreed to anything in either closed or public 560 00:47:54,740 --> 00:47:55,380 session. 561 00:47:56,060 --> 00:48:02,680 In fact, at our last closed session, we were left with the impression that some of these 562 00:48:02,680 --> 00:48:04,540 concepts might be developed further. 563 00:48:06,220 --> 00:48:11,100 The litigation attorney reluctantly gave us a paper copy of some of the things that we might 564 00:48:11,100 --> 00:48:17,200 consider that we expected to consider further in closed session. 565 00:48:17,580 --> 00:48:25,060 Nothing has happened in public session, and I have, up to this point, absolutely 566 00:48:25,060 --> 00:48:30,100 resented the implications, but I now understand what are some of this might be 567 00:48:30,100 --> 00:48:38,340 coming from, and I am here on this May. I normally would stay for public hearing. 568 00:48:38,340 --> 00:48:42,760 You all know I welcome and respect everybody's public opinions. 569 00:48:43,100 --> 00:48:46,880 I am leaving now at their recommendation of Mayor David Brems. 570 00:48:47,280 --> 00:48:50,840 I spoke with him yesterday on an unrelated matter. 571 00:48:51,160 --> 00:48:54,660 He expressed surprise that I was coming to this public hearing. 572 00:48:54,660 --> 00:48:59,280 He said, we don't want to give the impression that we are influencing the planning commission. 573 00:49:01,550 --> 00:49:03,230 Normally, I would say it's a public hearing. 574 00:49:03,430 --> 00:49:05,390 It's my job to hear what people can. 575 00:49:05,390 --> 00:49:11,310 And in this case, given the uncertainty and the rumors, in effect the revelations today, 576 00:49:11,610 --> 00:49:18,070 I don't want to do anything to enhance that perception that there might, see Council 577 00:49:18,070 --> 00:49:23,750 might be attempting to influence the independent and extremely experienced or hard-working planning 578 00:49:23,750 --> 00:49:24,090 commission. 579 00:49:24,390 --> 00:49:25,110 So I will leave. 580 00:49:25,330 --> 00:49:30,450 I promise all of you I will listen to the recording every minute of it. 581 00:49:30,610 --> 00:49:32,190 I have already read most of the letters. 582 00:49:33,530 --> 00:49:40,310 I expect that most of those letters, same letters, will come to us when we consider it next week, but I will leave now I don't want to. 583 00:49:41,230 --> 00:49:47,590 And I thank the planning commission for Lisa for turning your time over to me. 584 00:49:48,090 --> 00:49:48,470 Thank you. 585 00:49:48,650 --> 00:49:52,350 I look forward to learning of your decision. 586 00:49:52,910 --> 00:49:53,210 Thank you. 587 00:49:53,330 --> 00:49:53,610 Thank you. 588 00:49:53,890 --> 00:49:55,030 Thank you to everybody else here. 589 00:49:56,110 --> 00:49:56,550 All right. 590 00:49:56,550 --> 00:49:56,610 All right. 591 00:49:56,810 --> 00:49:57,270 Now, 592 00:50:00,590 --> 00:50:05,070 if anyone would like to speak, please raise your hand, and I'll recognize you, 593 00:50:05,270 --> 00:50:05,710 sir. 594 00:50:05,970 --> 00:50:06,570 Thank you, members. 595 00:50:07,230 --> 00:50:08,170 My name is Matt Stewart. 596 00:50:08,170 --> 00:50:10,610 I live at 5290 East Pioneer 4th. 597 00:50:10,990 --> 00:50:15,990 Really, and I apologize for interrupting, but there's just a lot of misinformation that this 598 00:50:15,990 --> 00:50:17,250 council is operating on. 599 00:50:17,530 --> 00:50:22,650 One, this is not a conservation, East vent, or agreement that runs with the land. 600 00:50:23,010 --> 00:50:23,790 That's simply correct. 601 00:50:24,510 --> 00:50:27,590 I don't care if you record it with a solid account or recorder or not. 602 00:50:27,590 --> 00:50:33,430 that does not make it an incumbrance on the land. That's just incorrect. This is an agreement 603 00:50:33,430 --> 00:50:39,730 between the parties, if Mr. like sold the property tomorrow, the buyer, the successor and 604 00:50:39,730 --> 00:50:48,770 interest, would not be bound by this. That's a fundamental fact. Okay? Second, what do you 605 00:50:48,770 --> 00:50:56,110 talk about? You won't even see this? It'll all be shielded? Have you walked up there? Have you? 606 00:50:56,110 --> 00:51:03,410 Yeah, you see the trailer and the side by side. You see the tree house. You see the purgola. 607 00:51:03,710 --> 00:51:07,490 Did he allegedly walked in from the Miner's Trail? 608 00:51:08,030 --> 00:51:08,790 Yes. 609 00:51:09,510 --> 00:51:17,190 He dropped all that stuff off trespassing through Pioneer Fort Road and Immigration Oaks. 610 00:51:17,510 --> 00:51:24,690 And he hasn't been forthright about that. And he's not to be trusted in this statement after this statement. 611 00:51:24,690 --> 00:51:31,620 You look at these recitals, who drafted these recitals, talking about the city 612 00:51:31,620 --> 00:51:35,620 agrees that this is conservation and harmony with the protection of the 613 00:51:35,620 --> 00:51:37,580 forest. Bullshit! 614 00:51:40,520 --> 00:51:44,520 Talks about it reflects their aligned values, promoting 615 00:51:44,520 --> 00:51:50,420 conservation, fire mitigation, and responsible man-to-mill property. Where is this 616 00:51:50,420 --> 00:51:57,460 side-by-side that is now on the property? Gonna go. It's a trail. It's a trail on a 617 00:51:57,460 --> 00:52:06,180 problem. You're a joke. This whole thing is a farce. In the city should not be a party to it. 618 00:52:07,780 --> 00:52:15,180 The recital says F. Property owner recognizes the need for motor vehicle access and 619 00:52:15,180 --> 00:52:19,820 agrees to certain conditions. That's a two minutes. Could I have something to say? 620 00:52:19,820 --> 00:52:21,760 Thank you, Chair. 621 00:52:21,980 --> 00:52:22,060 The final slide. 622 00:52:22,060 --> 00:52:22,340 And my. 623 00:52:23,200 --> 00:52:28,700 Recital Audis has specifically said the, excuse me, recital F specifically says the property 624 00:52:28,700 --> 00:52:33,920 owner recognizes the need for motor vehicle access and agrees to certain conditions quote 625 00:52:34,720 --> 00:52:39,280 until he has motor vehicle access in quote. 626 00:52:40,040 --> 00:52:48,380 Mr. like is quite unlikely to ever have motor vehicle access to this property period. 627 00:52:48,380 --> 00:52:54,140 So why are we talking about these things that require motor vehicle access? 628 00:52:54,380 --> 00:53:05,840 Why are we entering into this conservation development easement with a landowner who purchased the property knowing it was landlocked that he didn't have access prior to closing on the property, 629 00:53:06,140 --> 00:53:12,580 asked for as a joining property owners to grant an access to which they declined and he bought the property anyway. 630 00:53:14,060 --> 00:53:15,080 True, right? 631 00:53:22,690 --> 00:53:26,410 You're addressing the planning commission, sir, please despite the 632 00:53:26,410 --> 00:53:33,190 agreement saying that runs with the land the very clear it does not. I have 633 00:53:33,190 --> 00:53:37,970 done dozens of conservation easements that run with the land. I am very 634 00:53:37,970 --> 00:53:43,350 familiar with the legal language that is required to make an agreement run with 635 00:53:43,350 --> 00:53:52,330 land and this does not. And I caution this planning commission to be relying on legal counsel 636 00:53:52,330 --> 00:53:57,090 that now in at least two instances has proven to be incorrect, 637 00:54:00,120 --> 00:54:03,380 right? The only benefit the 638 00:54:03,380 --> 00:54:12,480 city gets from this is the waiver of these enumerated uses that two things. One, we're 639 00:54:12,480 --> 00:54:18,420 to assume Title 19 is going to be adopted, well, if it is, we don't get any extra benefit 640 00:54:18,420 --> 00:54:25,540 from this agreement, they're all prohibited uses, right? And second, he can terminate 641 00:54:25,540 --> 00:54:33,600 this thing tomorrow with no reason and no fall. That's section 7.2. So I've heard these 642 00:54:33,600 --> 00:54:39,720 statements about the benefit to the city. There's no benefit to the city for this agreement. 643 00:54:39,720 --> 00:54:42,900 And then how this agreement is going to be used by Mr. Mike? 644 00:54:43,660 --> 00:54:49,860 Is he is going to try to bootstrap this with other agencies and say the City of Immigration 645 00:54:49,860 --> 00:54:56,600 Canyon bless this and said I am doing good conservation things. 646 00:54:59,440 --> 00:55:06,280 And well, so he terminated the agreement and then 7.3 says he gets to keep everything that 647 00:55:06,280 --> 00:55:17,260 he put on the property, a barn, a lumber mill, three parking lots. Yet he has no vehicle 648 00:55:17,260 --> 00:55:24,460 access. Why are we green? He has three parking lots when he has no vehicle access. What 649 00:55:24,460 --> 00:55:24,920 are we doing? 650 00:55:27,040 --> 00:55:28,140 This is crazy. 651 00:55:31,460 --> 00:55:33,680 I can't believe the city is considering this. 652 00:55:42,260 --> 00:55:42,460 I can't believe 653 00:55:42,460 --> 00:55:49,280 This agreement was drafted by Mr. Lake or his counsel with very little thoughtful input 654 00:55:49,280 --> 00:55:52,220 from the city, and that's a problem. 655 00:55:53,460 --> 00:55:59,960 And this whole thing, and this notion that this, as Ren put, this is a done deal. 656 00:56:00,780 --> 00:56:02,420 The staff recommends this. 657 00:56:03,220 --> 00:56:04,660 This is a good idea. 658 00:56:05,560 --> 00:56:08,260 Our values are aligned with the applicant. 659 00:56:09,000 --> 00:56:15,340 Well, I can tell you there are a lot of citizens of immigration canyons city who do not believe 660 00:56:15,340 --> 00:56:17,480 their values are aligned with the applicant. 661 00:56:17,800 --> 00:56:18,800 Thank you very much. 662 00:56:26,450 --> 00:56:28,610 Do we have anyone else who would like to speak? 663 00:56:29,490 --> 00:56:29,830 Yes, sir. 664 00:56:38,130 --> 00:56:40,470 As a reminder, please state your name and address. 665 00:56:43,810 --> 00:56:46,050 I want to lighten this up a little bit. 666 00:56:47,890 --> 00:56:50,790 You know, I found my name. 667 00:56:51,450 --> 00:56:52,630 Oh, Roger McQueen. 668 00:56:53,330 --> 00:56:53,450 Thank you. 669 00:56:54,290 --> 00:57:04,370 I've found a treasure chest the other day in the mountains worth millions but I 670 00:57:04,370 --> 00:57:11,570 just can't find the key to unlock it. I'll share the treasure with you if you 671 00:57:11,570 --> 00:57:19,460 can give me some money and I can continue to look for more treasures and then it 672 00:57:19,460 --> 00:57:26,980 And then it would be shared, but you need to believe me that I know and I thought that I had found it. 673 00:57:27,800 --> 00:57:34,260 But you know what? Last year there were five keys that all didn't work. 674 00:57:36,940 --> 00:57:47,380 But I'll keep dreaming in and keep as long as you keep helping me with money and helping me dream. 675 00:57:47,380 --> 00:57:54,740 I just hope it comes true, so that's, you know, what we're talking about here. 676 00:57:55,860 --> 00:58:07,880 Last, last meeting we had here by things were very, I mean, everything he talked about 677 00:58:08,720 --> 00:58:16,620 was there, but everyone was denied by every single area that was in the meetings there. 678 00:58:16,620 --> 00:58:18,940 I hope you'll do the same here. 679 00:58:19,800 --> 00:58:20,920 Thank you. 680 00:58:23,940 --> 00:58:24,960 Thank you very much. 681 00:58:25,180 --> 00:58:25,840 Thank you very much. 682 00:58:25,880 --> 00:58:26,120 Thank you very much. 683 00:58:26,260 --> 00:58:26,860 Mr. Nimkin. 684 00:58:28,640 --> 00:58:29,200 My 685 00:58:33,720 --> 00:58:35,020 name is Dave Nimkin. 686 00:58:35,460 --> 00:58:38,720 I live at 6249 East Marathon Lane. 687 00:58:41,980 --> 00:58:44,960 Not to underscore some of the things that were said. 688 00:58:45,700 --> 00:58:51,540 I want to put the notion of what your role is as a planning commission with some context. 689 00:58:51,540 --> 00:58:57,720 I think there needs to be some consideration that it's not a cookie-cutter template, but 690 00:58:57,720 --> 00:58:58,920 that context matters. 691 00:58:59,600 --> 00:59:04,420 Four years ago, Mr. Lee made a presentation at the Immigration Improvement District when 692 00:59:04,420 --> 00:59:07,160 it first became aware of what he's been looking at doing. 693 00:59:07,660 --> 00:59:13,480 He's been consistent in trying to find a way to negotiate and move this forward. 694 00:59:14,260 --> 00:59:20,740 I have felt that this is a vehicle for him to try to do that, and it doesn't necessarily 695 00:59:20,740 --> 00:59:27,220 fit in the public interest. It's like the nose of the camel under the tent, ultimately 696 00:59:27,220 --> 00:59:33,340 there will be a need as indicated previously in the recitals that when there is a road 697 00:59:33,340 --> 00:59:41,160 he will be able to bring public safety support into the area. I think it's totally consistent 698 00:59:41,160 --> 00:59:47,320 with the land use in the area. I don't believe despite what the law says about a forest plan 699 00:59:47,320 --> 00:59:54,040 that it is consistent with the nature of what our community is and how it benefits the general public. 700 00:59:54,680 --> 00:59:57,960 So I'm also concerned about the exclusions. 701 00:59:58,320 --> 00:59:59,980 Exclusions for multi-famil- 702 01:00:00,210 --> 01:00:28,550 What about a single family residence at some point? There's nothing in here that suggests that. There's an exclusion for city's future laws. I don't even understand what that means. How does that even apply in terms of what we're looking at? There are legitimate concerns. I guess I would caution the planning commission to consider that this is premature, that it should be delayed. The public has not had a chance to fully embrace and understand this. 703 01:00:28,550 --> 01:00:36,870 It's not a yes or no, I'd say hold off and allow the requirements that Mr. 704 01:00:36,990 --> 01:00:43,650 Lyck is indicated in this to be dealt with on his terms, on his money, not taxpayer money, 705 01:00:43,990 --> 01:00:50,230 and that he should come to this group, to the City Council with those things rectified and value. 706 01:01:07,220 --> 01:01:12,160 I'm John Bird, six, nine, six, don't worry, he'll circle up, thanks, you guys, you're 707 01:01:12,160 --> 01:01:12,660 volunteers. 708 01:01:13,080 --> 01:01:17,520 This is a ton of work and a lot of heat for volunteer work, so I just want to put that 709 01:01:17,520 --> 01:01:17,900 out there. 710 01:01:21,460 --> 01:01:25,500 Ryan, you should do what the law allows, you know, you have your property. 711 01:01:26,440 --> 01:01:32,480 The loss, you know, our code says you have a road to develop, no road, no development. 712 01:01:34,510 --> 01:01:36,850 That should be the end of this discussion. 713 01:01:37,190 --> 01:01:42,710 Once there is a road established, create, come to the planning commission, let's create 714 01:01:42,710 --> 01:01:43,110 a plan. 715 01:01:44,430 --> 01:01:50,730 I could go through this thing line by line, don't have time, the recitals, I would suggest 716 01:01:55,990 --> 01:02:14,550 this is a positive thing, and it's a great lever if this thing comes back, where the city can't cancel it, but Ryan can, it comes back, and Ryan gets, hey, the city blessed this, they see that this improves fire safety, improves considerations, just all these beautiful things. 717 01:02:14,550 --> 01:02:22,770 is that makes no sense to us, that's not the situation, actually building roads, bulldozers, 718 01:02:23,150 --> 01:02:25,610 that tends not to be conservation oriented. 719 01:02:27,330 --> 01:02:34,790 The agreement itself that can be canceled at his desire, that's great if you're him, 720 01:02:35,450 --> 01:02:36,810 not so good for the city. 721 01:02:36,810 --> 01:02:39,610 This is premature, 722 01:02:41,750 --> 01:02:46,990 get your road approval, which does require taking property rights from 723 01:02:46,990 --> 01:02:51,390 hundreds of immigration residents to get that road approval, because there is land 724 01:02:51,390 --> 01:02:55,310 that it would have to cross owned by hundreds of the residents of this community. 725 01:02:57,030 --> 01:03:00,690 Get your road approval, then talk about a development plan. 726 01:03:01,430 --> 01:03:02,110 That's all I have to say. 727 01:03:08,340 --> 01:03:10,920 Anyone else here to make statements? 728 01:03:11,700 --> 01:03:12,020 Yes sir. 729 01:03:17,760 --> 01:03:19,160 My name is Chick Beener. 730 01:03:19,520 --> 01:03:21,240 I live at 402 Old Oak Road. 731 01:03:24,070 --> 01:03:26,410 I just want to know about access. 732 01:03:30,170 --> 01:03:33,510 How do you propose to get to your property? 733 01:03:35,570 --> 01:03:38,030 And like the man said with the oven, 734 01:03:38,490 --> 01:03:41,850 all that stuff we heard about at the beginning of this meeting, 735 01:03:43,290 --> 01:03:50,370 is any good unless he can get there and he bought a landlock piece of property. Who else 736 01:03:50,990 --> 01:03:58,050 has any of you done that? Has anybody bought a landlock property? You don't even need 737 01:03:58,050 --> 01:04:04,250 to go to kindergarten to know not to do that. And that's all I have to say. 738 01:04:13,040 --> 01:04:13,560 Just not a 739 01:04:13,560 --> 01:04:15,540 Do you have anyone else who'd like to speak? 740 01:04:19,310 --> 01:04:19,570 Yes, sir. 741 01:04:25,130 --> 01:04:26,130 My name is Ryan Pond. 742 01:04:26,270 --> 01:04:28,370 I live at 536 North Pioneer Full Road. 743 01:04:29,570 --> 01:04:37,110 I would like to bring up my concern is that this proposal is being, it's being proposed 744 01:04:37,110 --> 01:04:38,490 in our watershed area. 745 01:04:39,290 --> 01:04:40,190 I'm a builder. 746 01:04:40,630 --> 01:04:46,710 I've seen many of accidents happen in these developments, diesel, hydraulic fluid. 747 01:04:46,710 --> 01:04:56,350 This is being proposed in the heart of our well protection zone with no way for it to be overseen by officials. 748 01:04:57,010 --> 01:05:03,790 There's some discussion about flying them in occasionally or having a special allowance for his inspections for this. 749 01:05:04,490 --> 01:05:14,350 It's easy to, it's hard enough to catch violations when an inspector has consistent and open access to a project. 750 01:05:14,350 --> 01:05:27,290 But when there is no access for the inspections are being done by the applicant, it is very easy for things to get missed or spills to happen and not get cleaned up if they, if we have a 751 01:05:28,610 --> 01:05:35,730 large excavator that has a hydraulic hose that breaks, how does that get cleaned up in our well protection zone, and how do we get that out of there? 752 01:05:36,150 --> 01:05:43,970 How do we even identify that it's happened? It would be on him to do those things until he has that access for the inspectors. 753 01:05:44,350 --> 01:05:46,610 That's something I haven't heard other people bring up. 754 01:05:47,030 --> 01:05:54,490 I would like to also, you know, agree with all the previous comments that have been brought 755 01:05:54,490 --> 01:05:54,970 up today. 756 01:05:55,590 --> 01:06:00,730 And then this is, I'm not suggesting anything nefarious, but I do not understand the relationship 757 01:06:00,730 --> 01:06:06,170 between MSD's attorney providing legal counsel for Salt Lake City. 758 01:06:06,650 --> 01:06:11,870 I'm not asking you to give me answer, but if anybody can help me understand how we're taking 759 01:06:11,870 --> 01:06:12,430 advice. 760 01:06:12,430 --> 01:06:17,410 and I'm not saying it's you know I'm not no slight I just don't I can see where 761 01:06:17,410 --> 01:06:23,190 MSD's goals are not aligned with immigration cities or its residents and so 762 01:06:23,190 --> 01:06:27,890 I'm on I don't understand the relationship of the legal council we're getting so 763 01:06:27,890 --> 01:06:29,890 that's it thank you. Thank you miss Paul. 764 01:06:35,240 --> 01:06:38,640 Anything else? Yes sir? I have one very small comment. 765 01:06:38,640 --> 01:06:40,980 That was me, you know, on six-eight-seven-war. 766 01:06:41,120 --> 01:06:41,880 Don El-Circle. 767 01:06:42,540 --> 01:06:43,840 Did I hear the first name again? 768 01:06:45,380 --> 01:06:45,620 Ed. 769 01:06:46,560 --> 01:06:46,900 Ed. 770 01:06:47,020 --> 01:06:47,120 Ed. 771 01:06:47,120 --> 01:06:47,200 Ed. 772 01:06:47,200 --> 01:06:47,240 Ed. 773 01:06:47,500 --> 01:06:47,660 Ed. 774 01:06:47,660 --> 01:06:47,680 Ed. 775 01:06:47,680 --> 01:06:47,700 Ed. 776 01:06:47,700 --> 01:06:47,800 Ed. 777 01:06:49,280 --> 01:06:49,620 Ed. 778 01:06:49,620 --> 01:06:57,120 And so I've heard that part of the reason we're doing this is because we want to avoid legal battle with Mr. 779 01:06:57,280 --> 01:07:04,700 Lincoln, so I would propose that the members of the community set up our own legal pit bond and start seeing the hell out of him. 780 01:07:07,360 --> 01:07:08,320 Thank you. 781 01:07:13,460 --> 01:07:14,820 Yes, ma'am. 782 01:07:17,620 --> 01:07:18,100 Hello. 783 01:07:18,320 --> 01:07:19,360 I'm Terry Martin. 784 01:07:19,440 --> 01:07:21,520 I live at 5604 Pioneer. 785 01:07:22,160 --> 01:07:22,660 Fork Road. 786 01:07:23,080 --> 01:07:28,500 And I met Mr. Lyke on the trail, maybe soon after you bought the property. 787 01:07:28,700 --> 01:07:32,120 And he said, oh, I've just done this thing and not to worry. 788 01:07:32,340 --> 01:07:33,440 It's going to be accessible. 789 01:07:33,920 --> 01:07:38,060 And I'm not going to have any impact on the values you care about. 790 01:07:38,060 --> 01:07:43,700 Well, that was total nonsense since that time there's the structure that's appeared 791 01:07:43,700 --> 01:07:49,280 there's this weird hosing that's along the trail and now I hear about a double side. 792 01:07:50,100 --> 01:07:57,820 I mean I'm sorry, but I'm repeating some things other people said, but you bought a piece 793 01:07:57,820 --> 01:07:58,960 of landlock property. 794 01:07:59,400 --> 01:08:01,380 You bought it in a very sensitive area. 795 01:08:02,480 --> 01:08:07,700 You knew people denied you access and now you have this development plan, which when 796 01:08:07,700 --> 01:08:12,760 And I saw it two days ago, I went, this is tow under the tent. 797 01:08:13,420 --> 01:08:19,640 And you guys have a responsibility to look at the big picture long-term, not just the 798 01:08:19,640 --> 01:08:26,180 narrow confined areas that are spelled out. 799 01:08:27,200 --> 01:08:28,940 I mean, anyone can see what's happening. 800 01:08:29,260 --> 01:08:33,160 This is a tow under the tent, and eventually tear the tent down. 801 01:08:34,040 --> 01:08:40,260 You've gotten some approvals that help justify your losses to try and get access and to try and eventually 802 01:08:40,260 --> 01:08:47,280 Develop this project or sell it at a higher price. I mean I think we all know that's what's going on here 803 01:08:50,140 --> 01:08:57,220 So you look at this map. There's roads built on the property to its boundaries. What does that tell you? 804 01:08:57,700 --> 01:09:01,800 Why is something being approved before this guy has road access? 805 01:09:01,800 --> 01:09:08,260 us, clearly, table this until the access issue is resolved. 806 01:09:08,820 --> 01:09:14,780 Otherwise, you're just working backwards, and I hope you, I just seem so many playing 807 01:09:14,780 --> 01:09:19,340 commissions get stuck in a really narrow definition to stay safe of what they can cover. 808 01:09:19,980 --> 01:09:26,300 But I think your mandate allows you a larger look, and I hope you'll take it because I trust 809 01:09:26,300 --> 01:09:28,600 that you have a good will of this canyon at your heart. 810 01:09:29,460 --> 01:09:30,220 Thank you. 811 01:09:39,950 --> 01:09:45,630 My name is Paul Brown, I live at 696 North Pioneer Fort Broad, 812 01:09:47,660 --> 01:09:48,980 I've looked over this 813 01:09:48,980 --> 01:09:55,340 for both agreement, a lot of the boilers, we've talked about fire and we've talked about 814 01:09:55,790 --> 01:10:04,640 other things in road access, this really should be deferred until you get a real agreement 815 01:10:04,640 --> 01:10:11,980 in front of you rather than a lot of to be determined things in the agreement. 816 01:10:13,590 --> 01:10:20,660 The attorney fee shifting boilerplate is a trap for the unwary. 817 01:10:21,140 --> 01:10:28,340 I suspect that Mr. Bill Moore's billing rate is a small fraction of the billing rate of 818 01:10:28,340 --> 01:10:32,060 Mr. Light's international law firm that he's been using. 819 01:10:32,060 --> 01:10:37,760 and should there be any disputes that are resolved in favor of Mr. Light? 820 01:10:38,360 --> 01:10:44,620 The city will end up paying not just Mrs. Gilmore's fee, but also Mr. Light's fee, 821 01:10:44,820 --> 01:10:47,600 and that could be a very expensive proposition. 822 01:10:47,880 --> 01:10:53,160 So if this is being thought to save money, it's not going to work. 823 01:10:54,520 --> 01:10:56,680 So that is my main comment. 824 01:10:56,680 --> 01:11:04,160 the other stuff that has been, that I had to say has been said very well by others. I will affirm 825 01:11:04,160 --> 01:11:13,060 that there is no ongoing litigation between Mr. Light and joining landowners. That lawsuit was 826 01:11:13,060 --> 01:11:20,080 dismissed earlier this year as not yet been refiled. It was not appeal. There is no ongoing litigation. 827 01:11:20,480 --> 01:11:26,300 Now, I suspect there will be, but it's not here yet. So that's correction I have. Thank you, Tim. 828 01:11:26,980 --> 01:11:30,120 appreciate all this volunteer work. Thank you Paul. 829 01:11:35,900 --> 01:11:36,860 Any others? 830 01:11:40,160 --> 01:11:43,000 Yeah I'm Jeff Crockett. I'm at 831 01:11:43,000 --> 01:11:51,360 652 North Pioneer Fortbrook. Just to echo what Paul said and to build on that. I've got three 832 01:11:51,360 --> 01:11:59,700 points for the record. First the staff report may rest on a mistaken fact. The port says, as Paul 833 01:11:59,700 --> 01:12:03,540 just mentioned in the poor states that the applicant is currently in an active dispute 834 01:12:03,540 --> 01:12:09,720 over access rights. But my understanding is that the 2025 suit against this city, Salt 835 01:12:09,720 --> 01:12:15,220 Lake City and the Immigration Oaks owners, Property Owners Association was dismissed and has 836 01:12:15,220 --> 01:12:21,880 not been refiled. Access is the premise of this entire application and the staff's own project 837 01:12:21,880 --> 01:12:27,680 description says the agreement is requested due to the absence of motor vehicle access. 838 01:12:27,680 --> 01:12:33,880 So before the Commission recommends anything, I ask the staff confirm the litigation status on the record. 839 01:12:35,300 --> 01:12:42,060 The application, the second day, is the application is incomplete. There's exhibits A, C, and D. They're not in the packet. 840 01:12:43,020 --> 01:12:53,480 Staff has marked multiple sections, verification pending, and states those provisions remain subject to review, revision, or removal. 841 01:12:53,480 --> 01:12:59,800 How can the public meaningfully comment on an agreement whose exhibits don't even exist? 842 01:13:00,900 --> 01:13:03,040 Finally, the terms are very one-sided. 843 01:13:03,600 --> 01:13:07,680 Section 7-1 lists the property owner terminated well as we've heard. 844 01:13:08,240 --> 01:13:11,160 Section 7-2 preserves whatever he has already built. 845 01:13:12,080 --> 01:13:18,540 Meanwhile, Section 2.2 makes the agreement control over conflicting city ordinances. 846 01:13:18,540 --> 01:13:24,840 Section 2-3 exempts the project from the city's future laws, Section 3 runs it with the land. 847 01:13:25,500 --> 01:13:30,620 The city gives up 10 years of regulatory authority that he can walk away at any time and keep the improvements. 848 01:13:31,540 --> 01:13:38,880 I'm not asking you guys to decide on the merits today, but maybe just defer this until the exhibits are complete and the access question is settled. 849 01:13:40,060 --> 01:13:41,060 Thank you. 850 01:13:41,060 --> 01:13:42,120 Do you 851 01:13:47,460 --> 01:13:48,720 have anyone else who would like to speak? 852 01:13:51,220 --> 01:13:51,340 Sir. 853 01:13:52,380 --> 01:13:55,520 Herb and post, 60, 98, and fine, or four. 854 01:13:59,150 --> 01:14:02,530 This thing just doesn't make sense at all. 855 01:14:03,270 --> 01:14:06,370 You talk about conservation, which you need a road. 856 01:14:06,570 --> 01:14:10,710 And if you imagine, if you prevail in court and get access, 857 01:14:11,910 --> 01:14:15,330 you're going to make our roads public, which you know people don't want. 858 01:14:15,790 --> 01:14:18,430 But then you're going to build a road up through Freeze Creek 859 01:14:18,430 --> 01:14:24,930 and destroyed. How the hell can you talk about conservation on your piece of 860 01:14:24,930 --> 01:14:28,830 property and then destroy freeze-cree? It's just insane. 861 01:14:36,560 --> 01:14:38,600 Anyone else? Yes sir? 862 01:14:46,610 --> 01:14:52,750 Brad Barber, 763 north by your foregrowd. Quite a while since I've seen it. It has been long. 863 01:14:53,530 --> 01:14:59,790 I just want to make not to be difficult, but one of my responsibilities is 864 01:15:00,000 --> 01:15:28,200 I am the chair of the trails committee for immigration oaths. We maintain the trail and freeze-creek trail and make improvements. And in that job, you've seen over the years the value of this trail corridor to the community. It's where people interact. It's where you meet your neighbors. And it's true. It's obvious that the access that is required to make this happen 865 01:15:28,200 --> 01:15:32,480 is going to destroy that trail corridor. 866 01:15:33,300 --> 01:15:37,540 The heart of this community will be impacted 867 01:15:37,900 --> 01:15:39,060 for generations. 868 01:15:40,300 --> 01:15:47,060 This corridor is vital to the community of immigration Elks. 869 01:15:47,720 --> 01:15:51,200 To any consideration to destroy the heart 870 01:15:51,200 --> 01:15:54,440 of this community is simply not acceptable. 871 01:16:02,160 --> 01:16:02,600 Thank you, Rhett. 872 01:16:02,940 --> 01:16:03,280 Thank you. 873 01:16:08,080 --> 01:16:10,960 Do we have any members of the public online? 874 01:16:12,280 --> 01:16:14,080 I don't like that one. 875 01:16:14,080 --> 01:16:16,900 Is that Salt Lake Public Utility or so? 876 01:16:17,240 --> 01:16:17,320 Yes. 877 01:16:17,560 --> 01:16:17,720 Right. 878 01:16:17,960 --> 01:16:18,780 Public Works want to? 879 01:16:19,980 --> 01:16:23,500 Does anyone online care to make a statement? 880 01:16:26,630 --> 01:16:27,230 No, you did. 881 01:16:27,410 --> 01:16:28,130 Did you meet them? 882 01:16:28,590 --> 01:16:29,530 No, thank you. 883 01:16:29,530 --> 01:16:29,870 Thank you. 884 01:16:30,030 --> 01:16:30,610 You made it ourselves. 885 01:16:33,080 --> 01:16:33,420 Okay. 886 01:16:35,420 --> 01:16:39,800 Hearing none, I asked for a motion to close the public hearing. 887 01:16:40,480 --> 01:16:42,460 We'll make the most close to public hearing. 888 01:16:43,060 --> 01:16:44,680 We have a motion in a second. 889 01:16:45,340 --> 01:16:47,000 A discussion on the motion. 890 01:16:48,120 --> 01:16:49,980 Hearing none, all of the data, please be high. 891 01:16:50,360 --> 01:16:50,840 All right. 892 01:16:52,020 --> 01:16:52,760 Passes unanimously. 893 01:16:53,260 --> 01:16:53,600 Thank you. 894 01:16:53,900 --> 01:16:55,420 Thank you all for your comments. 895 01:16:55,860 --> 01:16:59,200 We will now go into a planning commission discussion 896 01:16:59,740 --> 01:17:00,620 on this matter. 897 01:17:01,500 --> 01:17:05,700 You are certainly welcome to stay, but we will not be taking 898 01:17:05,700 --> 01:17:09,000 any further input unless we need to ask 899 01:17:09,000 --> 01:17:10,500 the question of anyone here. 900 01:17:11,120 --> 01:17:13,220 Okay, I need one clarification for the record. 901 01:17:14,460 --> 01:17:17,260 If I did not emphasize this properly before, 902 01:17:18,720 --> 01:17:21,140 the city, this is a legislative decision 903 01:17:21,740 --> 01:17:27,140 where the city council would make the final termination. 904 01:17:28,000 --> 01:17:28,060 The, 905 01:17:30,440 --> 01:17:33,320 is subject to the final approval of the city council 906 01:17:33,780 --> 01:17:36,480 and if I have been unclear about that, 907 01:17:36,480 --> 01:17:47,800 I think I shouldn't have been, and secondly, that we have in the text that the agreement 908 01:17:47,800 --> 01:17:54,960 would not be construed as an approval by any other governmental entity other than the city. 909 01:17:55,520 --> 01:18:02,060 So to the extent that that clarifies anything I hope it does, and I'm happy to answer any 910 01:18:02,060 --> 01:18:04,200 questions as a result of the public comment. 911 01:18:05,040 --> 01:18:05,560 Thank you, Claire. 912 01:18:05,560 --> 01:18:07,900 Can I address the public before we start? 913 01:18:08,480 --> 01:18:08,600 Sure. 914 01:18:09,060 --> 01:18:13,740 Just very briefly, you all have available to you the packet. 915 01:18:14,800 --> 01:18:21,500 In that packet, there's an explanation of the options that this planning commission 916 01:18:21,500 --> 01:18:21,980 has. 917 01:18:22,920 --> 01:18:31,820 So we have a heard your comments, we've read your comments, we're also residents of the 918 01:18:31,820 --> 01:18:39,320 canyon and we agree with what you're saying. So I just want you to know you're heard 919 01:18:40,030 --> 01:18:47,820 by this body. But our hands are tied on what we are legally allowed to do. And what 920 01:18:47,820 --> 01:18:51,960 we are legally allowed to do and what we are required to do at the end of this meeting 921 01:18:53,140 --> 01:19:00,880 is to make a recommendation to the City Council. That is what has to happen by us at the end 922 01:19:00,880 --> 01:19:04,620 of this meeting as part of our commission requirements. 923 01:19:05,940 --> 01:19:07,820 Our options are listed in that packet. 924 01:19:08,140 --> 01:19:09,560 The first option is approval. 925 01:19:10,800 --> 01:19:13,200 The second option is approval with changes. 926 01:19:14,100 --> 01:19:15,440 The third option is denial. 927 01:19:16,280 --> 01:19:22,160 And there's another option that's not listed here, and that fourth option is to recommend 928 01:19:22,160 --> 01:19:24,640 tabling it or continuing it. 929 01:19:25,480 --> 01:19:33,280 So, I just want to make that clear, in case it hasn't been clear, our hands are tied 930 01:19:33,280 --> 01:19:34,660 and that is all we can do. 931 01:19:35,920 --> 01:19:38,580 So with that said, let's talk. 932 01:19:39,480 --> 01:19:40,040 Thank you, Jody. 933 01:19:42,010 --> 01:19:43,370 Anyone here to lead off? 934 01:19:44,330 --> 01:19:44,770 Consciousness. 935 01:19:45,630 --> 01:19:46,830 I'm going to have you talk here. 936 01:19:47,590 --> 01:19:47,890 Go ahead. 937 01:19:49,590 --> 01:19:55,990 So, we just got a late set of comments from Salt Lake Park. 938 01:19:55,990 --> 01:20:05,170 to the public works that I think is worth reading through because I didn't get a chance 939 01:20:05,170 --> 01:20:12,830 to read through it, but just in reading the first paragraph of it, it summarizes articulately 940 01:20:13,410 --> 01:20:15,690 all of the comments made by the public. 941 01:20:17,210 --> 01:20:19,950 I think this is received by Wendy today yesterday. 942 01:20:23,250 --> 01:20:33,510 Sorry, Salt Lake City Public Utility, yeah. Salt Lake City Public Utilities. So, Salt Lake City Public Utilities, 943 01:20:33,510 --> 01:20:38,270 respectfully request that the Planning Commission continue the public hearing and make no 944 01:20:38,270 --> 01:20:43,950 recommendation until a complete final CDA and all incorporated exhibits are publicly available 945 01:20:43,950 --> 01:20:49,110 and access, wildfire, water-right, and watershed issues identified below have been resolved. 946 01:20:50,550 --> 01:20:54,330 It's a commission to clients to continue the matter, so I'll see you part of the public 947 01:20:54,330 --> 01:20:56,050 utilities, request a recommendation from you. 948 01:20:57,830 --> 01:21:07,510 So it kind of goes on and articulates all of the same concerns, but in a more legal manner. 949 01:21:09,050 --> 01:21:14,990 So I think with these these late comments that just came in without any time for us to review 950 01:21:15,870 --> 01:21:25,570 and discuss and deliberate and in consideration of the incomplete nature of the proposed 951 01:21:25,570 --> 01:21:30,210 development agreement that we either need to deny it or continue it. 952 01:21:31,610 --> 01:21:36,790 I'm happy to stay for the rest of our time and kind of talk through the issues but 953 01:21:36,790 --> 01:21:41,490 But that's what I'm recommending at the end of this discussion, that we either 954 01:21:41,490 --> 01:21:45,250 table it, recommend tabling it, or recommend an aisle. 955 01:21:48,190 --> 01:21:54,410 So that said, can kind of maybe start to talk through some of the conditions. 956 01:21:54,410 --> 01:21:54,910 Yeah, I'd like to. 957 01:21:55,390 --> 01:21:56,210 And through that. 958 01:21:57,130 --> 01:21:59,350 And I'm sort of exactly what that does to me. 959 01:21:59,630 --> 01:21:59,810 Yeah. 960 01:22:01,690 --> 01:22:04,550 So we can either continue to talk, or we can just table it. 961 01:22:08,630 --> 01:22:10,390 I'm happy it's been another half hour. 962 01:22:11,010 --> 01:22:14,270 We do have up until 10-30 for discussion. 963 01:22:14,890 --> 01:22:18,210 Have you had a chance, Claire, to read this particular letter? 964 01:22:18,870 --> 01:22:23,610 I've been in contact with the Boone Solid City Attorney's Office. 965 01:22:23,990 --> 01:22:25,190 I'm familiar with their concerns. 966 01:22:25,810 --> 01:22:26,810 Okay, thank you. 967 01:22:28,570 --> 01:22:30,350 Do you have some more comments? 968 01:22:30,630 --> 01:22:35,970 Yeah, so I actually guess I have a question for our council, Claire. 969 01:22:35,970 --> 01:22:43,810 And I would caution them to get the legal advice being provided that is privileged and the 970 01:22:43,810 --> 01:22:46,910 opposing party is in the room in the classroom. 971 01:22:47,550 --> 01:22:49,470 This is an open and public meeting, yeah. 972 01:22:49,650 --> 01:22:52,550 Matt, okay, but I don't want her to wave. 973 01:22:52,810 --> 01:22:55,350 We have finished and you don't just get to start talking. 974 01:22:55,730 --> 01:22:58,370 Well, if you guys are making a fundamental mistake, I think I should. 975 01:22:58,970 --> 01:23:00,610 The public hearing is closed. 976 01:23:00,610 --> 01:23:00,850 Sir. 977 01:23:01,430 --> 01:23:01,570 Okay. 978 01:23:01,710 --> 01:23:04,290 Don't have your turn to give you advice in front of the opposing council. 979 01:23:04,730 --> 01:23:06,050 It's a more opposing party. 980 01:23:06,670 --> 01:23:07,190 Thank you for your question. 981 01:23:07,190 --> 01:23:08,150 That's actually good. 982 01:23:08,350 --> 01:23:08,450 Yeah. 983 01:23:08,650 --> 01:23:12,730 So maybe we make a motion to continue. 984 01:23:15,020 --> 01:23:18,640 Does anyone else have comments that look to share this point? 985 01:23:23,040 --> 01:23:23,180 Yeah. 986 01:23:23,600 --> 01:23:24,320 I still have. 987 01:23:25,080 --> 01:23:25,300 Okay. 988 01:23:25,540 --> 01:23:26,200 A lot of questions. 989 01:23:27,220 --> 01:23:27,560 Yeah. 990 01:23:27,820 --> 01:23:28,940 It's the need to be addressed. 991 01:23:29,380 --> 01:23:34,820 The questions can be maybe held with our council in a closed public discussion. 992 01:23:34,820 --> 01:23:50,160 I'm from the staff and so I can let you know if I feel like the information that you're asking me for is privileged, but there isn't any way for me to know that until I know the question. 993 01:23:50,360 --> 01:23:54,200 Yeah, so for that reason, but please ask. 994 01:23:55,020 --> 01:24:01,440 Well, I don't want to ask now. I think that was good advice by Matt Stewart to not talking about the opposing council. 995 01:24:12,460 --> 01:24:18,290 considering where we are right now, I think we should table it. 996 01:24:20,880 --> 01:24:21,060 So, 997 01:24:23,180 --> 01:24:24,160 what are your thoughts 998 01:24:24,160 --> 01:24:33,140 to him? And yeah, what are your thoughts? I think we should table it. What are your thoughts? 999 01:24:34,480 --> 01:24:44,100 That works. Okay, so I'm having a make-emotion. Okay, make-emotion and the table is 1000 01:24:45,680 --> 01:24:50,690 I'd like to add to the motion that the reason for 1001 01:24:50,690 --> 01:24:55,830 tabling the discussion is that the development agreement in its current state is incomplete, 1002 01:24:57,870 --> 01:25:06,090 contains conflicting language that goes against the intent of the immigration 1003 01:25:06,090 --> 01:25:10,830 can in general plan in current zoning ordinances. 1004 01:25:15,730 --> 01:25:16,970 Is that even way amendment? 1005 01:25:17,370 --> 01:25:17,470 Yes. 1006 01:25:19,810 --> 01:25:21,790 Are we chivaling it to a date specific? 1007 01:25:24,750 --> 01:25:29,750 Tabling it without any specific type of rain? 1008 01:25:30,210 --> 01:25:42,310 I think the date should be following the completion of the agreement, the draft agreement where 1009 01:25:42,310 --> 01:25:43,110 it doesn't have. 1010 01:25:43,110 --> 01:25:43,850 I don't think that's good. 1011 01:25:43,950 --> 01:25:53,450 Missing information, conflicting language, and notes stating that additional research 1012 01:25:53,450 --> 01:25:54,510 needs to be completed. 1013 01:25:59,640 --> 01:25:59,900 I don't know. 1014 01:26:00,660 --> 01:26:00,940 Do you? 1015 01:26:01,420 --> 01:26:01,860 Yeah. 1016 01:26:02,200 --> 01:26:02,520 All right. 1017 01:26:03,200 --> 01:26:03,520 Okay. 1018 01:26:03,580 --> 01:26:04,980 We have a motion and a second. 1019 01:26:06,040 --> 01:26:08,140 Do you have any discussion on that motion? 1020 01:26:09,080 --> 01:26:09,700 Who's seconded? 1021 01:26:10,280 --> 01:26:10,780 We didn't say. 1022 01:26:10,880 --> 01:26:11,140 I don't know. 1023 01:26:11,400 --> 01:26:12,580 I thought you did. 1024 01:26:13,000 --> 01:26:13,400 No. 1025 01:26:13,540 --> 01:26:14,080 I amended. 1026 01:26:14,360 --> 01:26:14,540 Yeah. 1027 01:26:15,080 --> 01:26:15,600 I'll say it now. 1028 01:26:15,600 --> 01:26:22,060 You got a second any for the discussion here your mountain on favor say aye 1029 01:26:22,060 --> 01:26:27,420 Any opposed passes unanimous sleep. Thank you