1 00:00:26,350 --> 00:00:43,330 All right, good evening, everyone. Welcome to the September 3rd meeting of the planning commission. With that, we'll take a roll call. We let the record reflected all five commissioners are present. And we'll start with the pledge of allegiance tonight. 2 00:01:07,580 --> 00:01:12,160 Oral communications, are there any speaker slips? We have none this evening. Okay. 3 00:01:14,200 --> 00:01:16,260 Any changes to the agenda tonight. 4 00:01:20,930 --> 00:01:22,930 But first I will be the consent calendar. 5 00:01:22,930 --> 00:01:27,190 the consent calendar is considered items are considered routine in nature. 6 00:01:27,590 --> 00:01:30,810 Tonight there's only one item on the consent calendar the approval of the 7 00:01:30,810 --> 00:01:35,750 minutes from the August 20th planning commission hearing. Can I get a motion on 8 00:01:35,750 --> 00:01:36,550 the consent calendar? 9 00:01:40,390 --> 00:01:45,350 I'll make a motion to approve. Second. Motion in a second. 10 00:02:01,970 --> 00:02:08,610 There we go. Okay the consent calendar passes 5-0 and we'll move right into our 11 00:02:08,610 --> 00:02:16,490 regular agenda items tonight. We'll start tonight with item 8A, the planning commission 12 00:02:16,490 --> 00:02:22,450 determination of general plan conformance for the purchase of property located at 2883 13 00:02:22,450 --> 00:02:30,270 Loan Jack Road for the potential development of a new fire station. With that, prior to 14 00:02:30,270 --> 00:02:33,470 this, are there any disclosures by planning commissioners? 15 00:02:38,860 --> 00:02:47,920 No disclosures, I won, I buy it three times a day, with that I'll turn it over to Denise 16 00:02:47,920 --> 00:02:49,780 Russell for a staff presentation. 17 00:02:50,460 --> 00:02:57,100 Actually, we have the director online, via phone, the presentation, sorry, put you on the 18 00:02:57,100 --> 00:02:57,480 spot. 19 00:02:59,340 --> 00:03:03,620 Good evening, Sarah Dalton, listeners, hopefully you can hear me. 20 00:03:04,280 --> 00:03:05,200 Yes, we can hear you. 21 00:03:06,000 --> 00:03:14,140 wonderful. I apologize for not being there tonight. My plans for flying to the Midwest were made 22 00:03:14,140 --> 00:03:20,520 before this effort to a participation. So again, I very much apologize for not being in 23 00:03:20,520 --> 00:03:21,500 this person. 24 00:03:23,950 --> 00:03:31,490 I'll get right into it. I have a super short presentation and it's not, it will take 25 00:03:31,490 --> 00:03:36,110 Again, very long at all, it will follow up with any answers. 26 00:03:36,370 --> 00:03:38,130 If you need to ask any questions about the data. 27 00:03:39,830 --> 00:03:44,470 This project is for the termination that is required by the state 7. 28 00:03:44,650 --> 00:03:48,670 These codes before a public agency can acquire a property. 29 00:03:49,910 --> 00:03:54,030 In this case, the property is located at 28.83 with a jack road, 30 00:03:55,470 --> 00:03:59,150 and is anticipated to be used to replace the current fire station 6 31 00:03:59,150 --> 00:04:01,510 and the O'Leven Hut Community. 32 00:04:03,600 --> 00:04:06,040 The planning commissioner has a limited review for state law 33 00:04:06,040 --> 00:04:09,180 and only has to determine if the proposed acquisition 34 00:04:09,180 --> 00:04:11,740 is consistent with the general plan 35 00:04:11,740 --> 00:04:14,800 in regard to the purpose, location, and extent. 36 00:04:17,090 --> 00:04:19,110 The office is recommending that the planning submission 37 00:04:19,110 --> 00:04:21,410 make the state required finding pursuant 38 00:04:21,410 --> 00:04:24,270 to the analysis provided in the FAF report. 39 00:04:26,050 --> 00:04:29,150 And it can be noted that any development 40 00:04:29,150 --> 00:04:31,890 that this property will require future permit approval, 41 00:04:32,830 --> 00:04:35,050 including both for the design. 42 00:04:36,750 --> 00:04:38,650 The California Environment of Quality Act, 43 00:04:38,930 --> 00:04:42,850 CISO will also be considered with use and design. 44 00:04:43,110 --> 00:04:43,270 That's it. 45 00:04:45,480 --> 00:04:47,660 Both staff from the Development Service Department 46 00:04:47,660 --> 00:04:50,120 and our distinguished fire chief are here 47 00:04:50,120 --> 00:04:53,900 to answer any questions, and this concludes my presentation. 48 00:04:55,020 --> 00:04:56,340 OK, thank you very much. 49 00:04:57,160 --> 00:04:59,820 Are there any questions of the staff? 50 00:05:00,000 --> 00:05:01,660 On the planning commission? One. 51 00:05:06,400 --> 00:05:29,580 Well, thank you very much. Apologize for your travels. Be well. Josh and Denise, thank you. Shout out for finding a place. I know you've been looking for a long time in the community and it's kind of hard to find one. Just a couple of quick questions. On, in the report, there's a comment about general plan consistency and you reference the safety element goal. 52 00:05:29,580 --> 00:05:36,440 are there any other references in the general plan other than safety that support 53 00:05:36,440 --> 00:05:38,640 this? That was the only reference that was made? 54 00:05:41,990 --> 00:05:44,210 I looked in the safety element, 55 00:05:44,490 --> 00:05:48,050 the land use element, and a couple other of the elements of some of the 56 00:05:48,050 --> 00:05:53,510 policies, and it really wasn't losing that hit right on the bulls eye. 57 00:06:03,910 --> 00:06:04,650 This is 58 00:06:04,650 --> 00:06:10,350 require property or sell property without even going through the process, but technically 59 00:06:10,350 --> 00:06:15,950 you are supposed to do it from state law and really what I've found over the years is 60 00:06:15,950 --> 00:06:22,550 that when you're looking through the general plan from a policy perspective, you're really 61 00:06:22,550 --> 00:06:32,960 focusing on more on policies that would require that you could just use the property for 62 00:06:32,960 --> 00:06:38,500 that fire station and acquire it for that use rather than be consistent with the real 63 00:06:39,060 --> 00:06:44,860 difficult to find out those policies that they, yeah, the little fire station can. 64 00:06:47,470 --> 00:06:51,350 Clearly, if you look in Sloan of Beach, there's fire stations right there off of Santa 65 00:06:51,350 --> 00:06:52,730 Faye Drive, next to houses. 66 00:06:53,450 --> 00:06:59,450 I'm sure there's plenty of fire stations in residential communities across, you know, 67 00:06:59,450 --> 00:07:06,910 city and or you know local communities and you feel that this is good enough to satisfy 68 00:07:06,910 --> 00:07:16,110 that code the general of the state law? Yeah absolutely the zoning for the property 69 00:07:16,110 --> 00:07:24,110 is rural residential floodplain and that zone pursuant to the city's land use matrix actually 70 00:07:24,110 --> 00:07:28,470 allowed fire stations with the minor commercial use permitted for them. 71 00:07:29,350 --> 00:07:29,410 Okay. 72 00:07:30,810 --> 00:07:36,430 And this has, we don't have to acquire any property from the county of San Diego. 73 00:07:36,630 --> 00:07:39,110 This is all within the city of San Diego. 74 00:07:39,350 --> 00:07:41,230 So over the last few years, 75 00:07:41,230 --> 00:07:44,570 there's been some concern about maybe working with the county to acquire some property. 76 00:07:44,690 --> 00:07:45,810 So this is all within the city. 77 00:07:49,200 --> 00:07:53,720 There was some other review for other properties to satisfy this need. 78 00:07:53,720 --> 00:07:57,400 but we came upon this one, and this one, this bike and bike, and I did good at it. 79 00:07:57,520 --> 00:07:58,020 I did try. 80 00:07:58,860 --> 00:07:59,120 Okay. 81 00:07:59,940 --> 00:08:03,560 And then, lastly, this probably not the right time, 82 00:08:03,680 --> 00:08:06,420 but we're going to approve the process. 83 00:08:07,520 --> 00:08:10,920 Does this affect Little Oaks Park at all? 84 00:08:11,760 --> 00:08:14,360 Is the plan in the future has been laid out, 85 00:08:14,560 --> 00:08:17,240 and you are comfortable knowing that if you go down this path, 86 00:08:17,740 --> 00:08:22,520 the site can be, I don't know what the correct architectural word cited, 87 00:08:22,520 --> 00:08:30,360 that the fire station fits and the ingress and egress has been at least looked at in advance 88 00:08:30,360 --> 00:08:35,360 of coming to the commission. We haven't seen that yet but hopefully we're not going 89 00:08:35,360 --> 00:08:39,720 down a path on a site that can't handle the needs of the fire department. 90 00:08:40,920 --> 00:08:48,910 Yeah, correct. I comment and we have looked into it. The property has about 250 feet of 91 00:08:50,510 --> 00:08:57,270 which is a large distance at some point with the major innovation of the property. 92 00:08:57,910 --> 00:09:01,550 You could easily provide it in and out, right away, access. 93 00:09:02,350 --> 00:09:07,470 Having the park located adjacent to it, and it's real helpful from a perspective, 94 00:09:07,870 --> 00:09:13,270 which is normal impact that might even as light as they are with the forest nation 95 00:09:13,970 --> 00:09:20,190 to a residential that isn't there so the park is the park makes for a perfect neighbor. 96 00:09:23,330 --> 00:09:31,070 And then last question, the road narrows right there, coming past the looks park headed 97 00:09:31,070 --> 00:09:32,870 to I guess we'll call that the northeast. 98 00:09:34,130 --> 00:09:37,470 And I guess it narrows also coming to the southwest around that bend. 99 00:09:38,050 --> 00:09:44,710 So you're comfortable in the sighting of the station and the ingress and egress that it's 100 00:09:44,710 --> 00:09:50,370 not use the phrase a blind curve because it's a pretty narrow road it narrows 101 00:09:50,370 --> 00:09:56,530 there and it's a tight turn a few feet beyond the house as you and then the road 102 00:09:56,530 --> 00:09:59,970 opens up 500 feet or so. 103 00:10:00,000 --> 00:10:29,480 So, after passing the curve. So, has that been taken into consideration as if this site is suitable? Again, we don't have the site plan, so it's hard for me to know. But I just want to ask the question now. Now, that's again an excellent question. We have looked at it from an apparatus perspective. Our apparatus can work within that right away. And it does work even that right away. So, in the blind curve, we've also looked at that from the perspective. 104 00:10:29,480 --> 00:10:42,740 There's mitigations that we can do from a perspective of painting the street if required put in spout signs, just different type of mitigation for circulation and safety. 105 00:10:43,760 --> 00:10:52,840 But again, like you said, we don't have a site plan or development plan just developed at this time. 106 00:10:53,200 --> 00:10:53,320 Right. 107 00:10:53,320 --> 00:10:57,460 So they'd have the command later point when we get a little further down the road. 108 00:10:57,940 --> 00:10:58,400 No, I understand. 109 00:10:58,500 --> 00:11:01,180 I just wanted to make sure that was at least under thought process. 110 00:11:01,180 --> 00:11:05,480 I'm sure it was, as you know, the site has its physical limitations to it. 111 00:11:06,340 --> 00:11:10,420 I'm just hoping that that was thought, and these guys like you guys went through it and thought 112 00:11:10,420 --> 00:11:10,860 about that. 113 00:11:11,000 --> 00:11:11,660 So I appreciate it. 114 00:11:12,100 --> 00:11:12,360 Thank you. 115 00:11:13,280 --> 00:11:13,880 Thank you. 116 00:11:14,300 --> 00:11:14,480 A 117 00:11:17,170 --> 00:11:18,970 couple follow-up questions. 118 00:11:20,630 --> 00:11:29,430 The first is, how does the square footage of the site compare to the other fire stations 119 00:11:29,430 --> 00:11:30,890 that we have in town? 120 00:11:31,410 --> 00:11:35,990 Is it comparable in size to what we have or a figure? 121 00:11:37,390 --> 00:11:41,950 I haven't driven by that area for a while, but it seems like it's a pretty large piece 122 00:11:41,950 --> 00:11:42,470 of property. 123 00:11:43,830 --> 00:11:55,170 Yeah, the property is 23,000, so it's 250 feet fronted, it's a lot of low track like I mentioned, and 100 feet feet. 124 00:11:56,370 --> 00:12:08,550 As far as comparison to the other fire station, I think I'll leave that question to our fire chief who's very familiar with those other states and locations in the fight. 125 00:12:08,550 --> 00:12:13,910 So, maybe chief handles our question. 126 00:12:14,750 --> 00:12:16,250 Yeah, of course, great question. 127 00:12:17,410 --> 00:12:21,790 The, this site would be more aligned with our station four, 128 00:12:21,910 --> 00:12:25,310 which is in Village Park, right by 7-11 off of Village Park, 129 00:12:25,310 --> 00:12:26,330 and not in District right there. 130 00:12:27,330 --> 00:12:30,090 It's roughly about the same size, a different shape. 131 00:12:30,770 --> 00:12:33,570 But if you think of station two off of Birmingham, 132 00:12:33,570 --> 00:12:37,790 that's kind of a narrow lot as well. 133 00:12:37,790 --> 00:12:43,770 And so we would have to do some kind of design that would be more of that narrow lot-wise, 134 00:12:44,010 --> 00:12:49,390 but as far as square footage, it aligns a lot with station four in Gochemann. 135 00:12:49,810 --> 00:12:50,010 Okay. 136 00:12:50,910 --> 00:12:56,350 And then my understanding is that the current site that we have in Alivanhane on Rancho 137 00:12:56,350 --> 00:12:59,610 Santa Fe Road is operating off of least land right now. 138 00:13:01,730 --> 00:13:05,990 Are we in any danger of losing access to that in any time soon? 139 00:13:06,850 --> 00:13:11,530 No, the property owner there has been very gracious and collaborative with us. 140 00:13:11,870 --> 00:13:18,830 Right now we have entered into a lease for five years and we are actually going to 141 00:13:18,830 --> 00:13:28,110 do some tenant improvements to make that a larger fire station until the future permanent 142 00:13:28,110 --> 00:13:30,270 fire station can be identified. 143 00:13:30,270 --> 00:13:41,750 Right now this is a property that we're coming in general or to planning commission for, but we have we have plans for that other property off of ranch Santa 144 00:13:41,750 --> 00:13:45,690 Fey Road for long term to make sure that we can provide the service to the community. 145 00:13:46,190 --> 00:13:47,030 Okay, thank you. 146 00:13:50,540 --> 00:13:58,260 And lastly, this takes a while, my understanding is you have to send the plans to the State Board of Architecture and it takes 147 00:13:58,260 --> 00:14:04,100 well to get this bid, so an ideal world for the community, what can they expect? 148 00:14:04,720 --> 00:14:10,400 Or plus the budget has to be, I see there are certain members of the City Council here tonight. 149 00:14:10,680 --> 00:14:17,460 So there has to be a capital plan associated with funding, and we're already trying to figure out how to fund the one-down town. 150 00:14:17,480 --> 00:14:23,540 So what's the timeline in your best estimation that the community can look at for something like this? 151 00:14:24,980 --> 00:14:30,680 Well, two things. One is if you look at our this year's work plan for the City Council, 152 00:14:31,020 --> 00:14:35,620 it is one of the items to find out what our long-term budgeting is for station one and 153 00:14:35,620 --> 00:14:41,620 station six. And I'll tell you the second thing is I've learned my lesson on giving any 154 00:14:41,620 --> 00:14:48,820 time frame. I could not tell you what that is. I know that if we do find a piece of property, 155 00:14:49,000 --> 00:14:53,480 we go through design and permitting and making sure we find a budget, it's going to be 156 00:14:53,480 --> 00:14:59,940 years down the road right and we're we're planning for that long-term investment not uh 157 00:15:00,080 --> 00:15:30,060 Not to just find a spot and try to plop down on it, right? So, we want to make sure we're doing our due diligence, making sure that we're planning ahead of time, and that we're not putting the city in a spot where we can't afford it. Thank you. I have one quick question. There's a, seems to be a small triangular parcel of land to the northeast of the site. Is that part of the purchaser is at a different parcel? That's a different parcel. If you look to the other side of the street, 158 00:15:30,060 --> 00:15:34,280 there with the home. That actually belongs to that piece of property. 159 00:15:35,080 --> 00:15:40,100 So right now, it's its own property. It's not part of what we're looking at. 160 00:15:40,160 --> 00:15:43,200 Okay, but you don't need that parcel to make this site. 161 00:15:43,940 --> 00:15:46,080 No, no, no, no. Okay, thank you. 162 00:15:47,680 --> 00:15:52,540 Okay, thank you very much for those answers. Are there any public comments on this? 163 00:15:53,240 --> 00:15:54,440 No, I'm not on this item. 164 00:15:54,640 --> 00:15:58,340 Okay, seeing none, I'll close the public comment portion and 165 00:15:58,340 --> 00:16:00,460 I can open it up to Commissioner Deliberation. 166 00:16:02,940 --> 00:16:12,320 I think really just a reminder, we're only talking about the purchase of land and not the design or the future station that will be there. 167 00:16:13,020 --> 00:16:15,600 Just do we think it's an appropriate site to purchase. 168 00:16:18,060 --> 00:16:27,700 Yeah, I mean look, I support the opportunity to buy the property, the community clearly needs it and it's been a priority for the city for many, many years. 169 00:16:27,700 --> 00:16:36,360 Mayor Ailer is here tonight, lives in the community, knows he's probably heard this conversation for the last 15 to 20 years, and I know Josh is probably, excuse me, 170 00:16:37,260 --> 00:16:43,720 Fire Chief Gordon has probably had to deal with this for a super long time with all the leases over what we currently have on that temporary spot. 171 00:16:44,080 --> 00:16:53,800 I mean, this is an important component to the community to actually find a place and get the ball rolling to the next chapter is really important for the community. 172 00:16:53,800 --> 00:17:03,600 I think for all events in the US because many of the fires come back from which Greek and others came over the hill and having that response time is critical. 173 00:17:04,620 --> 00:17:09,980 And on an underlying piece of it is also something as simple as fire insurance that people are having. 174 00:17:10,440 --> 00:17:18,580 A lot of us have been dropped from our insurance companies and having response times narrowed even by half a mile from the existing. 175 00:17:18,580 --> 00:17:23,920 But I think it's more not just the response time, but the type of trucks that respond. 176 00:17:24,280 --> 00:17:30,320 I think right now we have a very, the type of truck that we have can't do the kind of work 177 00:17:30,320 --> 00:17:36,140 that a larger truck can do that can pump water and do some of the various firefighting. 178 00:17:36,200 --> 00:17:47,080 So it's an important component for the community and I think we'll impact everybody in the 179 00:17:47,080 --> 00:17:48,660 kind of equipment that we're planning on, 180 00:17:48,800 --> 00:17:50,280 or the city's planning on doing. 181 00:17:50,660 --> 00:17:54,300 So, taking a while to get even to this kickoff start, 182 00:17:54,480 --> 00:17:56,260 this beginning of this next chapter, 183 00:17:56,480 --> 00:17:59,760 but I think it's a big important step for us. 184 00:18:01,380 --> 00:18:05,500 Yeah, I definitely recognize that the city's been looking 185 00:18:05,500 --> 00:18:08,860 at that community to install a fire station. 186 00:18:09,420 --> 00:18:12,340 And I know they've been looking at that area, 187 00:18:12,340 --> 00:18:15,180 particularly in the site very closely. 188 00:18:15,180 --> 00:18:20,320 And so it's nice to see it sort of developing to the stage and moving forward. 189 00:18:20,600 --> 00:18:24,640 And I think they've done their due diligence in looking at the location and certainly 190 00:18:24,640 --> 00:18:25,900 in support of it moving forward. 191 00:18:26,740 --> 00:18:27,300 Okay. 192 00:18:29,200 --> 00:18:34,640 I would agree that it's important for us to have something that is a fully functional 193 00:18:34,640 --> 00:18:36,320 fire station for the area there. 194 00:18:37,380 --> 00:18:43,560 Development going east from there has in the year 25 years I've lived here has just continued 195 00:18:43,560 --> 00:18:44,020 to grow. 196 00:18:44,020 --> 00:18:50,100 So even if it's just a mile or so from where the station is now turning on 197 00:18:50,100 --> 00:18:55,120 tarantulasan if they rode, it's probably harder to get to go east than being 198 00:18:55,120 --> 00:19:01,260 over on Loan Jack a bit. So it feels like it would make response time a little 199 00:19:01,260 --> 00:19:05,960 bit better. I've been up in Palo Alto area when they have fire trucks come and 200 00:19:05,960 --> 00:19:09,640 there's so much traffic on those old roads that the fire trucks drive down the 201 00:19:09,640 --> 00:19:13,580 opposite side of the street which is when you're stuck there in traffic it's very 202 00:19:13,580 --> 00:19:23,020 scary so this seems like a good place to look at seeing what can be done so that for hopefully 203 00:19:23,020 --> 00:19:27,220 never but hopefully if something does come up that the fire department is able to do a 204 00:19:27,220 --> 00:19:36,720 quicker response. Okay, Michael, any comments? No comment, I'm also in support of this project. 205 00:19:36,940 --> 00:19:41,740 Why don't we move to a motion? Yeah, you know, one last thing is applaud the city and the 206 00:19:41,740 --> 00:19:46,440 staff Josh and everybody the fact that we are still able to find a site and keep little 207 00:19:46,440 --> 00:19:52,360 loaks park. I know it's a small place but it is used by the community. It is a horse driven 208 00:19:52,360 --> 00:19:57,880 community and that park is used quite a bit every now and then it gets a little hard and needs 209 00:19:57,880 --> 00:19:59,780 it be dragged, but nonetheless it's there. 210 00:20:00,000 --> 00:20:09,540 It is you. So, the fact that we were able to find something and still maintain public park and open space for the community is just even more kind of gravy. Thank you. 211 00:20:11,840 --> 00:20:20,340 I guess the next point is the motion to approve. I'd like to make a motion to approve. Well, we'll, we'll say, and I'll second that. Okay. I'm seeing a motion in a second. I'll call the vote. 212 00:20:30,230 --> 00:20:32,070 Okay. That passes 5-0. 213 00:20:42,060 --> 00:20:44,880 Okay. Our next item tonight is item 8-B. 214 00:20:44,880 --> 00:20:52,520 the pi-may residences, case number multi-008-091-2025. 215 00:20:53,740 --> 00:20:56,200 Are there any disclosures by commissioners? 216 00:20:58,480 --> 00:21:00,580 I drive by it a lot on my way to the BH. 217 00:21:00,780 --> 00:21:02,400 So I'm familiar with what the site is. 218 00:21:02,560 --> 00:21:03,620 Where the site is located. 219 00:21:04,860 --> 00:21:06,620 I can see it from my home. 220 00:21:07,180 --> 00:21:09,540 That particular location from the East Angle. 221 00:21:10,360 --> 00:21:11,740 I drove by it a few minutes ago. 222 00:21:12,640 --> 00:21:12,900 Okay. 223 00:21:13,360 --> 00:21:14,040 Thank you guys. 224 00:21:15,100 --> 00:21:23,640 with that, this one is being presented to us by, sorry, Christina Bustamonte. 225 00:21:36,830 --> 00:21:39,550 Good evening, commissioners, members of the public. 226 00:21:39,830 --> 00:21:42,830 My name is Christina Bustamonte. I'll be presenting this project this evening. 227 00:21:43,950 --> 00:21:48,070 This project is for the demolition of an existing single-family residence 228 00:21:48,070 --> 00:21:51,650 and the construction of a two-story duplex with a basement 229 00:21:51,650 --> 00:21:54,410 and an attached garage for each unit. 230 00:21:54,410 --> 00:21:59,270 A duplex is a two attached single family residence on one legal law. 231 00:22:00,010 --> 00:22:09,550 Unit 1 features 2447 square feet of living area, 285 square feet of deck area, and 410 square 232 00:22:09,550 --> 00:22:10,290 feet of garage. 233 00:22:11,310 --> 00:22:20,890 Unit number 2 features 2454 square feet of living area, 291 square feet of deck area, and 234 00:22:20,890 --> 00:22:23,330 400 and 10 feet for a garage. 235 00:22:24,190 --> 00:22:27,270 The project is located within the old Incinita's District. 236 00:22:27,870 --> 00:22:31,470 The project is surrounded to the north, east, and south 237 00:22:31,470 --> 00:22:34,910 by a mix of commercial and residential land uses. 238 00:22:35,530 --> 00:22:38,850 Into the west, a mix of commercial, residential uses, 239 00:22:39,170 --> 00:22:39,890 and moonlight beach. 240 00:22:45,760 --> 00:22:47,840 The project requires the following permits, 241 00:22:48,600 --> 00:22:51,000 design review permit for construction of a duplex, 242 00:22:52,300 --> 00:22:53,800 landscaping and site improvements, 243 00:22:53,800 --> 00:22:59,900 a cost of development permit for the review of compliance for local cost of 244 00:22:59,900 --> 00:23:00,240 program. 245 00:23:02,560 --> 00:23:06,680 The subject property is owned residential 15 which allows for a 246 00:23:06,680 --> 00:23:11,680 maximum building height of two stories and 22 feet measured to the top of 247 00:23:11,680 --> 00:23:16,380 roof above the exterior building wall and 26 feet measured to the peak of a 248 00:23:16,380 --> 00:23:22,100 pitched roof with a minimum of a 312 pitch. The height of the proposed structure is 249 00:23:22,100 --> 00:23:27,120 measured from the lower of the existing or proposed grade. The maximum building height 250 00:23:27,120 --> 00:23:33,860 for unit 1 is 20 feet 1 ¾ inches from the building edge to the top of the roof material 251 00:23:33,860 --> 00:23:41,160 and 22 feet 6 inches to the top of ridge. The maximum building height for unit 2 is 21 feet 252 00:23:41,160 --> 00:23:47,960 and 9 inches to the top of roof material above the exterior wall and 25 feet 11 inches to the top 253 00:23:47,960 --> 00:23:50,200 of the roof material at the ridge. 254 00:23:50,880 --> 00:23:56,600 Reposed project complies with all height regulations and a condition of approval has been added 255 00:23:56,600 --> 00:24:02,840 to require a height certification from a license, land surveyor during construction to demonstrate 256 00:24:02,840 --> 00:24:05,220 compliance with the plans and height limitations. 257 00:24:07,410 --> 00:24:13,110 Project features two-story duplex with decks on the first and second floor and exterior materials 258 00:24:13,110 --> 00:24:20,610 such as seam, metal roof, wood, and facet and trim, glass guardrails, horizontal 259 00:24:20,610 --> 00:24:26,670 wood sighting, cement plaster, porcelain tile, and aluminum clad windows and 260 00:24:26,670 --> 00:24:32,070 doors. The project features similar size, massing colors and materials with the 261 00:24:32,070 --> 00:24:35,970 existing neighborhood and will maintain the existing desirable character of the 262 00:24:35,970 --> 00:24:36,290 neighborhood. 263 00:24:39,560 --> 00:24:44,780 Unit 1 has a front yard setback of 19 feet and six inches, a rear yard 264 00:24:44,780 --> 00:24:51,900 setback of 25 feet, 5 and a half inches, and a north side yard setback of 5 feet. Unit 265 00:24:51,900 --> 00:24:59,960 2 has a front yard setback of 24 feet, 7 inches, a rear yard setback of 20 feet and a self 266 00:25:02,960 --> 00:25:29,980 The project proposes a 2006 square foot basement, living area for unit number one and two. The basement area within the duplex qualifies as a basement as per incident as municipal code, pursuant to the municipal code definition of a basement, one half of the perimeter of the basement is less than or equal to four feet above the lower of the natural orphanage grade as defined. 267 00:25:29,980 --> 00:25:31,560 defined by instantivism as code. 268 00:25:32,520 --> 00:25:34,780 Additionally, for the purposes of building 269 00:25:34,780 --> 00:25:37,560 conformance with the two-story code limitation, 270 00:25:38,400 --> 00:25:41,360 the qualifying basements do not count as a story. 271 00:25:41,900 --> 00:25:45,800 And the structures, as proposed, are two-story with a basement. 272 00:25:46,560 --> 00:25:49,440 The basement features two bedrooms, two bathrooms, 273 00:25:50,100 --> 00:25:52,000 a laundry room, and a bonus room. 274 00:25:53,720 --> 00:25:58,540 The first story of each unit features a bedroom, a bathroom, 275 00:25:58,540 --> 00:26:02,600 a walk-in closet, a two-car garage, and a patio. 276 00:26:03,720 --> 00:26:06,940 A second story features a living room, a dining room, 277 00:26:07,360 --> 00:26:10,120 a kitchen, a bedroom, and a deck. 278 00:26:12,240 --> 00:26:17,520 This is the west elevation, which is also the front of these homes. 279 00:26:19,220 --> 00:26:23,840 This is the east elevation, which is also the rear of these homes. 280 00:26:25,060 --> 00:26:28,740 This is the south elevation, which will be one of the sides. 281 00:26:30,040 --> 00:26:35,020 And this is the North elevation, which will be the other side. 282 00:26:38,040 --> 00:26:43,440 A landscape plan is required for new construction projects with an aggregate landscape area equal 283 00:26:43,440 --> 00:26:53,300 to are greater than 500 square feet demonstrating compliance with Incinitas Municipal Co-Chapter 2326 water efficient landscape regulations. 284 00:26:53,300 --> 00:27:09,380 The project includes 708 square feet of on-site landscape area, and 499 square feet of off-site landscape area located within the right of way, for a total of 1,207 square feet of landscape area. 285 00:27:10,180 --> 00:27:19,540 A newly adopted chapter 2327 native plants went into effect on May 15th, 2026, is 286 00:27:19,540 --> 00:27:24,500 applicable to this site, which requires 50% of the total landscape area of the 287 00:27:24,500 --> 00:27:29,520 project site planted with Southern California native plants. Plant pallet 288 00:27:29,520 --> 00:27:35,460 consists of 90% of native plant types. The project is located within the R15 289 00:27:35,460 --> 00:27:41,200 zone, which is considered a higher density single family and multifamily residential zone. 290 00:27:41,480 --> 00:27:46,960 This zone requires 30 trees per net acre as part of the project's landscaping. 291 00:27:47,680 --> 00:27:49,860 And this site is required to provide four trees. 292 00:27:50,400 --> 00:27:52,180 The project is providing six trees and 293 00:27:52,180 --> 00:27:56,760 complies with underlying landscape requirements as well as the native plant ordinance. 294 00:27:58,980 --> 00:28:03,820 Applicant held a citizen participation program meeting at the project site. 295 00:28:03,820 --> 00:28:10,380 In accordance with the municipal code on March 14th, five members of the public attended 296 00:28:10,380 --> 00:28:14,560 the meeting, a resident brought up concerns regarding the retaining wall that's located 297 00:28:14,560 --> 00:28:19,520 along the southern property line of the subject parcel between the two residential developments. 298 00:28:20,140 --> 00:28:26,080 The applicant has responded in both the applicant and the neighbor or in conversations about 299 00:28:26,080 --> 00:28:30,680 that retaining wall and will continue to work together as the project continues through construction. 300 00:28:31,460 --> 00:28:45,260 Notice of this public hearing was mailed on August 20th, 2026 to all property owners and occupants within 500 feet of the project site and to anyone who requested such notice and writing. 301 00:28:46,240 --> 00:28:54,540 No other comments were received during the public noticing period other than the same neighbor that commented during the citizen participation program. 302 00:28:54,540 --> 00:28:55,480 The 303 00:28:57,720 --> 00:29:01,300 project has been determined to be exempt from environmental review, 304 00:29:01,540 --> 00:29:06,680 pursuing to California Environmental Quality Act guidelines section 15301I, 305 00:29:06,880 --> 00:29:11,920 which exempts the demolition of one single-family residence and 15303A, 306 00:29:12,140 --> 00:29:15,540 which exempts the construction of small structures, including a duplex. 307 00:29:16,720 --> 00:29:21,860 The proposed project with conditions incorporated is consistent with the objectives 308 00:29:21,860 --> 00:29:26,240 and policies of the general plan and local coastal plan and demonstrates compliance 309 00:29:26,240 --> 00:29:31,960 with the applicable sections of the Incinitas Municipal Code and objective design standards 310 00:29:31,960 --> 00:29:35,960 in the Incinitas design standards and guidelines document. 311 00:29:37,060 --> 00:29:42,480 The findings can be made to support the project, therefore staff recommends approval of the 312 00:29:42,480 --> 00:29:45,120 design review permit and coastal development permit. 313 00:29:45,940 --> 00:29:50,880 Thank you for your time, myself, and the applicant are available for questions. 314 00:29:52,520 --> 00:29:53,740 Thank you, Christina. 315 00:29:53,740 --> 00:29:55,800 Are there any questions of the staff? 316 00:29:57,900 --> 00:29:58,500 Commissioner Whitaker. 317 00:30:00,000 --> 00:30:28,880 Yes, thank you for the report. We just today, the Commission received some public communication regarding the project. And I don't know if it's an appropriate time for that, but if I could just ask about it. I was just curious, there seemed to be approximately 11 items or so that were outlined concerns and requests. 318 00:30:28,880 --> 00:30:35,600 And I was just wondering like how much of that is actionable by the commission. 319 00:30:36,580 --> 00:30:39,140 All right, so it's a good question. 320 00:30:39,640 --> 00:30:43,780 It's question that the resident that sent the comments also asked. 321 00:30:44,440 --> 00:30:50,780 Many of these items that have been brought up in the comments are standard practice for 322 00:30:50,780 --> 00:30:51,160 us. 323 00:30:51,340 --> 00:30:57,140 They will be items that will get reviewed during the construction document review phase. 324 00:30:57,140 --> 00:31:01,700 So when the building permit comes in, the grading permit comes in, these items will get reviewed. 325 00:31:02,320 --> 00:31:08,980 There are some items on here related to costs and who is to be burdened with the costs. 326 00:31:09,300 --> 00:31:14,380 That is not something that the city would take an action on, or would create a condition 327 00:31:14,380 --> 00:31:19,300 of approval of, because it's on private property, and that's something that is a civil matter 328 00:31:19,300 --> 00:31:20,680 that will be between the owners. 329 00:31:21,920 --> 00:31:25,860 And so that's very general, very broad about this. 330 00:31:25,860 --> 00:31:39,220 The other things that I would say is that we have a lot of standards in place that speak to these things and so we would not necessarily add conditions of approval to the project because they're already standard practice. 331 00:31:40,160 --> 00:31:44,460 So that's very, very general but if you have more specific questions, I'd be happy to answer those. 332 00:31:44,460 --> 00:31:45,540 No, it's just time. 333 00:31:45,640 --> 00:31:46,540 Thank you for- 334 00:31:46,540 --> 00:31:53,480 Mr. Chair, I could add to that to your point, what can you do with essentially any type 335 00:31:53,480 --> 00:31:54,240 of public comment? 336 00:31:54,520 --> 00:32:00,380 It all goes to what you're here to do as your job as a planning commission, and that 337 00:32:00,380 --> 00:32:02,020 is make the findings in the resolution. 338 00:32:02,820 --> 00:32:08,760 And so if any of that that's in the staff report, I'm sorry, it was staff report, public comment 339 00:32:08,760 --> 00:32:17,840 And those comment letters goes to affect your findings, one of those mandatory findings that you need to make, that's where it will be applied. 340 00:32:18,500 --> 00:32:27,600 But as far as addressing those 11 points in the letter, I think you're really referring to, it's not your job. 341 00:32:27,720 --> 00:32:29,620 It's not the city's job to resolve those things. 342 00:32:29,620 --> 00:32:36,520 and I was probably saying many of those are private landowner to landowner type dispute issues 343 00:32:37,280 --> 00:32:46,460 that you're not here to mediate essentially. So when it comes to a finding 344 00:32:47,340 --> 00:32:51,880 that's what you're here to do is act as a judge and whether or not those findings could be made. 345 00:32:51,880 --> 00:32:52,080 Are 346 00:32:56,460 --> 00:32:58,240 there any other questions, the staff? 347 00:33:02,750 --> 00:33:03,870 Mr. Printergaston. 348 00:33:04,850 --> 00:33:05,790 Wait for you. 349 00:33:06,050 --> 00:33:06,250 No. 350 00:33:06,470 --> 00:33:06,810 Go ahead. 351 00:33:07,090 --> 00:33:07,270 Okay. 352 00:33:08,010 --> 00:33:09,910 Thank you for the presentation. 353 00:33:11,430 --> 00:33:12,370 Let's see. 354 00:33:13,290 --> 00:33:15,150 So this is a pretty tight site. 355 00:33:15,590 --> 00:33:24,110 It qualifies by basically less than 1% to go to 5,015 square feet. 356 00:33:25,210 --> 00:33:27,250 Was there a survey that was submitted? 357 00:33:27,250 --> 00:33:32,030 I see architectural plans, but there are a survey and a LTA survey that's been prepared. 358 00:33:32,350 --> 00:33:40,310 Are you comfortable with the fact that it's 5,000 and 15 square feet because if it's not 5,000 and 15 square feet, 359 00:33:40,670 --> 00:33:45,170 then I think the applicant falls into a different category and different classification. 360 00:33:47,270 --> 00:33:50,030 Yes, and fairly comfortable that that's the size of the property. 361 00:33:52,510 --> 00:33:55,210 Just walk me through, I think it's more rhetorical questions. 362 00:33:55,210 --> 00:34:23,410 So this is a legal, non-conforming lot, and the R15 zone requires that to be a 20,000 square foot lot to be acted upon or built on, but our code EMC 30.08 allows for development on a 5th, so does the EMC 30.058 override the zoning ramification because this is a legal, non-conforming lot? 363 00:34:23,410 --> 00:34:32,330 I don't know that I would use those exact words to describe it, more so that the development 364 00:34:32,330 --> 00:34:34,950 standards are in place, they remain in place. 365 00:34:35,550 --> 00:34:42,810 The code also allows for a caveat that says in these circumstances, when it's a 5,000 366 00:34:42,810 --> 00:34:48,970 square foot lot, and it's in this zone, we are giving a provision to allow for a duplex. 367 00:34:49,970 --> 00:34:54,730 So it's not overriding, that's not a word I would use in this case, but there is a caveat. 368 00:34:55,150 --> 00:34:59,010 Okay, so it's in the code that, well, it's not 20,000 square feet. 369 00:35:00,000 --> 00:35:29,100 It is 5,000 square feet, and if it is 5,000 square feet, then it can do a duplex. Correct. In this particular zone. In this particular zone. Okay, as related to some of the, one of the emails that came through, one of them was, you know, how, how close to the property line, will the excavations be? I understand there's a five-foot setback along both the north and the south side of the property. 370 00:35:29,100 --> 00:35:36,360 But will they be digging a hole and down and approximately how deep will the hole go? 371 00:35:37,320 --> 00:35:41,380 Yeah, so for that. Yes, you're correct. There's a five-foot separation 372 00:35:41,380 --> 00:35:51,520 But I think for a more detailed response if I may try and lean on either the geotechnical engineer or the engineer on the project 373 00:35:51,520 --> 00:35:58,940 That might provide a little more insight on how that happens when there's excavation happening close to a property line great 374 00:35:59,100 --> 00:35:59,420 Thank you. 375 00:36:03,850 --> 00:36:07,570 As far as depth, what I can say is that there is a maximum 376 00:36:07,570 --> 00:36:10,310 depth of 17 feet. 377 00:36:10,670 --> 00:36:15,610 And I also want to state that this is the discretionary 378 00:36:15,610 --> 00:36:21,470 phase, so the preliminary design of the project 379 00:36:21,470 --> 00:36:24,970 and final design will determine all of the specifics 380 00:36:24,970 --> 00:36:29,030 of the showering excavation and everything. 381 00:36:30,150 --> 00:36:31,350 So you're comfortable in reviewing. 382 00:36:31,350 --> 00:36:38,930 There was a geotechnical report that was submitted, and I think that, you know, when you go 383 00:36:38,930 --> 00:36:46,230 down, I'll just say you cut a hole, you know, is there going to be tiebacks or anything 384 00:36:46,230 --> 00:36:52,050 that's infringing upon either the north or south adjacent properties that the developments 385 00:36:52,050 --> 00:36:57,090 going to require approval? I mean, are they going to go into the neighbor's property based 386 00:36:57,090 --> 00:37:02,530 on the plenaries, I'm not an engineer or an architect, so based on the plenary drawings 387 00:37:02,530 --> 00:37:08,970 that we have, will there be any intrusions such as a tieback or something into the adjacent 388 00:37:08,970 --> 00:37:09,410 properties? 389 00:37:13,500 --> 00:37:19,660 No, there won't be any intrusion or encroachment into adjacent properties. 390 00:37:21,040 --> 00:37:27,740 Basically when we do a provisionary approval of this, the geotechnical report basically identifies 391 00:37:27,740 --> 00:37:35,500 the soil conditions and the geologic conditions of the site, and if there are any geotechnical hazards, 392 00:37:35,880 --> 00:37:41,280 they make recommendations for mitigation. There are no significant geotechnical hazards on this property. 393 00:37:42,200 --> 00:37:49,140 But if encroachment is necessary, the approval of adjacent properties would be mandatory. 394 00:37:50,020 --> 00:37:56,800 Okay. And that would be determined through the grading permit process and the shoring design process. 395 00:37:56,800 --> 00:37:56,920 Yes. 396 00:37:57,640 --> 00:38:03,420 So if things change and the designs come in, the neighbor would be notified, some comfort 397 00:38:03,420 --> 00:38:07,880 that the neighbor had that all of a sudden he'd have to be contacted or they would have to 398 00:38:07,880 --> 00:38:08,440 be contacted. 399 00:38:08,980 --> 00:38:11,320 It would have to be contacted and permission given. 400 00:38:11,580 --> 00:38:11,860 Understood. 401 00:38:12,200 --> 00:38:12,360 Okay. 402 00:38:12,760 --> 00:38:14,120 Thank you. 403 00:38:15,480 --> 00:38:17,700 I'm going to put my glasses back on. 404 00:38:19,850 --> 00:38:26,590 So just to, again, another rhetorical question, the basement area doesn't count to the FAR, 405 00:38:26,590 --> 00:38:27,110 correct? 406 00:38:27,110 --> 00:38:35,970 So it's really everything the basement is under our codes are separate from the floor area ratio calculations or the size of the house. Is that correct? 407 00:38:36,230 --> 00:38:36,970 Yes, that's correct. 408 00:38:38,270 --> 00:38:46,130 Any idea how much percentage of the living area is going to be considered a basement? Is it like 35%? 409 00:38:46,490 --> 00:38:48,450 I don't have a percentage. 410 00:38:48,570 --> 00:38:52,830 Well, maybe the applicant can answer that one. So I'll leave that one for the applicant because he'll know. 411 00:38:52,830 --> 00:39:05,210 So, let's see, on, there's a picture on page of the document of the PDF, I think it's 412 00:39:05,210 --> 00:39:11,490 page 77 of the PDF, of the staff report, which is really the architectural drawings. 413 00:39:11,490 --> 00:39:23,110 there's a deck that seems to visually extend from the second floor to the 414 00:39:23,110 --> 00:39:29,910 west and I guess is really again just some clarification. It seems to be 415 00:39:29,910 --> 00:39:34,950 encroaching upon into the setback that's allowed and can you tell me how long 416 00:39:34,950 --> 00:39:39,850 or not wide that deck is but can you tell me the distance that it really extends 417 00:39:39,850 --> 00:39:42,850 into the setback? Does it go all the way to the property line? 418 00:39:45,220 --> 00:39:47,580 It doesn't. Okay. Oh, it does 419 00:39:47,580 --> 00:39:54,500 even. Okay, so it's a visual. That looks like. Okay, so that's a visual. All right. The architect 420 00:39:54,500 --> 00:39:55,740 take to help me out. Thank you chair. 421 00:40:00,080 --> 00:40:01,040 What page was that? 422 00:40:05,920 --> 00:40:06,100 Okay. 423 00:40:08,580 --> 00:40:12,080 Oh, maybe the applicant can, can help out with that. 424 00:40:14,880 --> 00:40:22,140 On page 83 of the, I would like to suggest that the applicant changed Manhattan Beach to 425 00:40:27,940 --> 00:40:41,140 needs to change on page 85 of the PDF item number 16, also references Manhattan Beach standard plan 5ST. 426 00:40:42,620 --> 00:40:50,220 So I'd like to ask if that is the correct reference or is it just a typo and that actually references the city of 427 00:40:50,220 --> 00:40:56,480 since Anita's codes as it relates to item number 16 on page. 428 00:40:57,660 --> 00:41:02,500 This is from the FGB engineers from the city of Anaheim. 429 00:41:02,720 --> 00:41:04,700 So I hope that they know where in Anita's is. 430 00:41:07,340 --> 00:41:08,880 And that's it for me. 431 00:41:11,440 --> 00:41:12,820 Okay, are there any other questions? 432 00:41:14,560 --> 00:41:15,280 Commissioner Kimble? 433 00:41:15,740 --> 00:41:18,040 Yes, I had one question around. 434 00:41:18,040 --> 00:41:23,920 And there was something in the report that talked about the work that the applicant would 435 00:41:23,920 --> 00:41:29,760 have to do around the curb in the front of the property and drainage, could you go into 436 00:41:29,760 --> 00:41:34,440 a little more detail of what they're going to be required to do, and is that an improvement 437 00:41:34,440 --> 00:41:35,480 to what exists today? 438 00:41:39,480 --> 00:41:48,380 Yeah, you might be referring to the permanent BMP that this project requires, and it is an 439 00:41:48,380 --> 00:41:56,720 improvement and essentially the water, the storm water, is treated essentially and then 440 00:41:57,240 --> 00:42:03,400 pumped out to third street after it's essentially treated and clean. 441 00:42:03,800 --> 00:42:06,920 Is there an open drain in front of the property currently now? 442 00:42:08,740 --> 00:42:14,740 There's probably, yeah, there's drainage outlets like most properties. 443 00:42:22,830 --> 00:42:29,290 Okay. Thank you very much. Is the applicant here, would they like to address the commission? 444 00:42:40,800 --> 00:42:43,620 Gary, I think your microphone is not working. 445 00:42:46,100 --> 00:42:47,520 Okay. I think you're fine. 446 00:42:50,000 --> 00:42:55,800 Okay. The owners are here as well. They're long-time residents of Encinitas and should you have any questions for them? 447 00:42:56,340 --> 00:43:01,220 They'd be happy to address those. I want to thank Christine, our planner for 448 00:43:01,220 --> 00:43:07,000 working us through the project. She's been terrific in helping us navigate the city process. 449 00:43:08,120 --> 00:43:12,800 This is an interesting site in that it has significant slope and two directions. It slopes from 450 00:43:12,800 --> 00:43:18,620 the east to the west approximately 12 feet and it also has a pretty steep cross slope of approximately 451 00:43:18,620 --> 00:43:25,660 seven feet sloping from the north down to the south. This makes it challenging to site a building on 452 00:43:25,660 --> 00:43:31,400 there and what we did was we stepped the duplex down following the slope from the east 453 00:43:31,400 --> 00:43:37,420 to the west and we also split the duplex setting the southern unit a couple feet lower 454 00:43:37,420 --> 00:43:40,080 than northern units so it again follows the terrain. 455 00:43:41,020 --> 00:43:43,500 This helps to make the project a little bit more interesting. 456 00:43:43,600 --> 00:43:49,000 It breaks up the mass and it lowers the roots as it steps down with the terrain. 457 00:43:49,000 --> 00:43:54,940 We also incorporated a pretty good interior court to break the building up. 458 00:43:55,940 --> 00:44:02,140 It goes about half the depth of the building so that these appear as two separate units and not as one single building. 459 00:44:03,280 --> 00:44:07,080 The primary views are towards the southwest looking at Moonlight Beach. 460 00:44:07,960 --> 00:44:13,620 So instead of typically mirroring the plan as most of these type of duplexes are, 461 00:44:13,620 --> 00:44:20,240 We oriented both of the main living spaces towards the Southwestern view, so it gives 462 00:44:20,240 --> 00:44:24,040 it a little bit different character, and again helps to break up the mass of the building. 463 00:44:24,500 --> 00:44:31,140 We also slid the northern unit farther forward, offsetting the two sides, and again it helps 464 00:44:31,140 --> 00:44:33,060 to add more character in complexity. 465 00:44:34,000 --> 00:44:42,440 The design is a contemporary motif, it incorporates stucco, wood siding, tile, and a standing seam 466 00:44:42,440 --> 00:44:49,660 metal roof, there is also metal windows and doors with glass guardrails and horizontal 467 00:44:49,660 --> 00:44:55,840 stucco bands. We had very positive feedback about the design at the citizen participation 468 00:44:55,840 --> 00:44:59,960 patient plan, and we have been in discussions with the next... 469 00:45:00,000 --> 00:45:28,060 Members, and I think we can satisfy all of their concerns. I believe this project will be an enhancement to the local community and appreciate your support. I can answer any questions I'd be happy to. Thank you, Gary. Questions? Yeah, on just that deck of question. How far does that deck extend? The allowed encroachment into the front yard is four feet, and I believe on one side, the south side, we don't even encroach into the setback. 470 00:45:28,060 --> 00:45:32,460 I believe on the north side it's under four feet if we put the plans up 471 00:45:32,460 --> 00:45:36,220 I could tell you exactly it should be on there is it three-foot three-foot 10 472 00:45:36,220 --> 00:45:39,960 three-foot 10 okay so maybe that's just a visual on that plan 473 00:45:39,960 --> 00:45:47,420 all right that's that's all I have okay not seeing any other questions for your 474 00:45:47,420 --> 00:45:54,300 Gary all right thank you are there public comments we do have one speaker and 475 00:45:54,300 --> 00:45:56,520 that's not ultimate that's 476 00:46:00,390 --> 00:46:01,810 your cue thank 477 00:46:07,860 --> 00:46:08,940 you guys appreciate the time 478 00:46:09,400 --> 00:46:12,260 I am the person who sent the letter in that you asked about. 479 00:46:13,420 --> 00:46:38,240 I want to make sure that you know that I do support the project, I'm not against the project, I like the project, pro-development, pro-the-neighborhood, being invested in, and so I think I went down a little bit of an AI rabbit hole on the letter I sent, so apologies if it was too much, but do have a lot invested in the property that I own next door. 480 00:46:38,240 --> 00:46:48,240 And want to make sure that we do protect our property rights and the biggest thing for us is the retaining wall next to the between the two properties and because there's a slope. 481 00:46:49,100 --> 00:46:55,400 There's concern for us that that wall doesn't get treated correctly or that the costs are burdened on us. 482 00:46:55,980 --> 00:47:07,340 We probably will rebuild our house at some point in the future and want to make sure we work collaboratively with the neighbor arm on who we know and have every intention to do that. 483 00:47:07,340 --> 00:47:22,200 And I wanted to have it be a successful situation, but not being as fully knowledgeable about the process wanted to make sure that any condition around that was addressed so that we have a good solution and then it's not something that turns into a neighbor dispute. 484 00:47:22,980 --> 00:47:25,140 So your help in that regard is very welcome. 485 00:47:26,040 --> 00:47:36,920 And then second, that whole area that you're familiar with because I think many of you guys have either looked upon it or drive around it, have driven by their, it's very impacted with parking. 486 00:47:37,400 --> 00:47:46,280 And with traffic and with various things happening, we don't have a garage for our cars, so we park on the street, a lot of people do park on the street just to access the beach. 487 00:47:47,100 --> 00:47:59,260 And so I just think it's like to put our concerns on record about parking with the amount of construction traffic as well as time of day because the project is right next door bedroom. 488 00:47:59,260 --> 00:48:05,260 system and just whether we could get some assistance, whether it's collaborating with the 489 00:48:06,380 --> 00:48:15,820 owner or having some kind of adjustment to the times in the morning when the construction 490 00:48:15,820 --> 00:48:20,600 starts because at 7 a.m. that means the guys start at 6.30 they get there and they start 491 00:48:20,600 --> 00:48:25,780 unloading, especially during the weekends, so appreciate any consideration on that as well. 492 00:48:25,780 --> 00:48:28,320 So that's, that's really the main things that we had. 493 00:48:31,180 --> 00:48:33,360 And thanks for the thoughtful questions. 494 00:48:34,320 --> 00:48:35,720 Okay, thanks for coming in tonight. 495 00:48:37,590 --> 00:48:39,280 No other questions or no other comments? 496 00:48:39,920 --> 00:48:46,200 Okay, does the applicant want to spend a rebuttal 497 00:48:46,200 --> 00:48:47,700 or any time after that? 498 00:48:47,900 --> 00:48:48,160 The 499 00:48:52,060 --> 00:48:53,300 project and ourselves. 500 00:48:54,000 --> 00:48:57,340 We've been a resident of Incentive Distance in 1995. 501 00:48:58,140 --> 00:49:01,780 We purchased this home in 98, and with the- 502 00:49:01,780 --> 00:49:04,180 If I could interrupt you, just briefly, I'm going to apologize. 503 00:49:05,120 --> 00:49:11,220 This is a time I'm offering if new information was presented that you feel you need to respond to. 504 00:49:11,660 --> 00:49:16,520 Yeah, the response to Madam, like Madam Jessica, we've known each other since they moved next door. 505 00:49:16,620 --> 00:49:19,740 We have a good relationship, we had a really good discussion at the job site. 506 00:49:20,260 --> 00:49:25,560 Of course, this retaining wall has for the engineering comment, we have to go through the design process. 507 00:49:25,560 --> 00:49:31,940 we will get whatever needs to be done and we're not going to break any walls down without a good 508 00:49:31,940 --> 00:49:36,540 collaboration and talking with one another. So we'll definitely definitely do that. We have a 509 00:49:36,540 --> 00:49:40,760 couple of alternatives. It's too early in the process to know exactly how we're going to approach it 510 00:49:40,760 --> 00:49:47,480 yet. I said that and then I don't have a contract yet so we don't even know about start times. 511 00:49:47,600 --> 00:49:54,160 I mean it's a little bit ahead of the process but we'll for sure we've been good neighbors with all 512 00:49:54,160 --> 00:49:55,660 of our neighbors, we'll continue to be so. 513 00:49:56,140 --> 00:49:57,920 Okay, good, thank you very much. 514 00:50:00,000 --> 00:50:08,420 With that, I'm going to close the public comment portion of the hearing and open it up to Commissioner deliberation. Commissioner Quinn, do you want to start down at your end? 515 00:50:11,930 --> 00:50:32,210 The only comment I have is that it is a very tight spot I drove by there today. And it's going to cause some, you know, the construction part of it and the workers and the excavation, everything is is going to be tough, but that's what happens in that area. That's the only comment I have. Okay. 516 00:50:32,210 --> 00:50:43,570 thank you. Commissioner Kimmel. Yes it is tight. My concern is around the 517 00:50:43,570 --> 00:50:47,170 parking and how all the construction crews will be managed while that 518 00:50:47,170 --> 00:50:52,970 construction is going on primarily because it is so popular and you know while 519 00:50:52,970 --> 00:50:57,730 timing has not been identified during the summer it's if you come down there in 520 00:50:57,730 --> 00:51:04,230 your car. It's it's a free for all for parking. And so I just like to make sure that when this 521 00:51:04,230 --> 00:51:08,730 project does go for you know if this project goes forward and is in a construction phase making 522 00:51:08,730 --> 00:51:16,930 sure that this staff is following whatever processes we have in place to ensure that all the workers 523 00:51:16,930 --> 00:51:23,430 and any permanent or semi-permanent structures are complying with whatever our regulations are that 524 00:51:23,430 --> 00:51:26,430 that I can see that being kind of neighborhood friction, 525 00:51:27,390 --> 00:51:28,650 very easy to occur. 526 00:51:33,840 --> 00:51:34,480 OK, thank you. 527 00:51:35,040 --> 00:51:37,000 So yeah, initially when I looked at the project, 528 00:51:37,340 --> 00:51:39,800 I really didn't really draw a lot of questions 529 00:51:39,800 --> 00:51:40,820 or concerns for me. 530 00:51:41,500 --> 00:51:44,520 I certainly thought it felt well within that particular community. 531 00:51:44,600 --> 00:51:46,480 I thought the size of a lot and the tightness 532 00:51:46,480 --> 00:51:48,480 of the particular location for building 533 00:51:48,480 --> 00:51:51,780 was very typical of that particular area of our communities. 534 00:51:51,780 --> 00:52:03,300 and essentially I was left very supportive and then more recently since my first 535 00:52:03,300 --> 00:52:07,380 of review we've gotten some public comments and then I had a lot of questions just 536 00:52:07,380 --> 00:52:11,360 about the process but I feel very good about what we've heard from the 537 00:52:11,360 --> 00:52:19,800 developer, what we've heard from the neighbor from the applicant as well that 538 00:52:19,800 --> 00:52:25,580 And things are being looked after as far as these concerns that have been raised. 539 00:52:27,560 --> 00:52:37,020 And it seems that some of it will take place in that dialogue and that discussion in managing 540 00:52:37,020 --> 00:52:37,320 that. 541 00:52:37,620 --> 00:52:42,760 But some of it also will take place when they're finalizing the approval of the grading 542 00:52:42,760 --> 00:52:44,700 and the like. 543 00:52:45,580 --> 00:52:51,680 We only got the geotechnical study even today, and I just had a chance to briefly review 544 00:52:51,680 --> 00:52:57,700 it, just skim through it, and I certainly had things that I think would perhaps need 545 00:52:57,700 --> 00:53:02,720 to be addressed as they move forward with it, but I didn't feel like it was something 546 00:53:02,720 --> 00:53:05,140 that would draw this to it. 547 00:53:06,420 --> 00:53:11,620 If anything, I might accept a continuation, just so some of those things could be addressed, 548 00:53:11,620 --> 00:53:20,860 and we could revisit them perhaps, but in general, I'm supportive and I'd be happy to see it go forward as well. 549 00:53:21,540 --> 00:53:23,060 Okay, Mr. Pregnitz. 550 00:53:24,280 --> 00:53:27,320 Yeah, I echo my fellow commissioners. 551 00:53:27,900 --> 00:53:30,700 It seems like there's a good rapport between the two property owners. 552 00:53:30,860 --> 00:53:32,480 I know you have some concerns about parking. 553 00:53:34,400 --> 00:53:39,060 I had a kind of question for staff about safety and especially in the alley. 554 00:53:39,060 --> 00:53:45,560 Are you comfortable because there's going to be so much excavation? 555 00:53:46,100 --> 00:53:51,080 There's going to be a lot of trucks, and if the alley is an ingress in egress for 556 00:53:51,080 --> 00:53:54,600 the neighbors, next door neighbor and all the other neighbors. 557 00:53:55,640 --> 00:54:01,120 Can you speak to one of the questions like how are they going to haul out a project that 558 00:54:01,120 --> 00:54:06,420 is in a tight neighborhood like this and having watch construction occur in a leave and 559 00:54:06,420 --> 00:54:12,160 line, big trucks, and they leave them in the middle of the road, they detach. 560 00:54:13,620 --> 00:54:20,520 How do you handle, how do you suggest it gets handled when you're doing this in a tight 561 00:54:20,520 --> 00:54:23,540 neighborhood with the haul out? 562 00:54:25,490 --> 00:54:26,330 How does that work? 563 00:54:27,030 --> 00:54:27,430 Sure. 564 00:54:27,710 --> 00:54:34,050 So, that is something that would be covered and reviewed with a traffic control plan, and 565 00:54:34,050 --> 00:54:38,310 The traffic control plan gets submitted during the construction permit review process. 566 00:54:39,250 --> 00:54:44,490 And so there is some indication that if needed they would do a partial alley closure and 567 00:54:44,490 --> 00:54:44,890 not a full. 568 00:54:45,170 --> 00:54:47,290 But again, it would get reviewed further. 569 00:54:48,590 --> 00:54:51,710 And is there anything else that you'd like to add to that? 570 00:54:55,970 --> 00:54:58,370 No, unless you have any follow up questions. 571 00:54:58,370 --> 00:54:59,970 I guess the question would be... 572 00:55:00,900 --> 00:55:21,000 On a traffic control situation and you have a proposed, you have a planned date, will the neighbors be notified of a potential closure of the alley when there's a hall out as part of your traffic control plan so that they can plan their day around the hall out? 573 00:55:23,520 --> 00:55:29,100 Yeah, what I what I understand is that they would be notified for sure. Okay. Alright. 574 00:55:32,020 --> 00:55:35,220 Another thing you mentioned was construction hours. 575 00:55:35,840 --> 00:55:36,120 It's tough. 576 00:55:36,980 --> 00:55:40,980 I mean, there are city standards that everybody kind of has to follow, and so I'd probably 577 00:55:40,980 --> 00:55:41,620 leave that up. 578 00:55:41,800 --> 00:55:46,000 It's hard in this one particular comment on number five. 579 00:55:46,420 --> 00:55:47,920 I get it super sensitive. 580 00:55:48,160 --> 00:55:49,120 They show up at 6.30. 581 00:55:49,960 --> 00:55:53,320 Or maybe even earlier, hanging out, waiting for the clock to start. 582 00:55:54,240 --> 00:55:57,300 But I think I have to kind of leave that to the two of you to figure out. 583 00:55:57,300 --> 00:56:02,280 And if the construction company and the workers are not being good civil 584 00:56:02,280 --> 00:56:05,740 neighbors, then I think you probably need to talk to your neighbor about it. 585 00:56:06,080 --> 00:56:12,300 I don't know if we can make a waiver or a finding that your particular request is 586 00:56:12,300 --> 00:56:14,340 allowable because then everybody would get one. 587 00:56:14,600 --> 00:56:15,840 And that's why there's a standard. 588 00:56:16,060 --> 00:56:18,300 So it's a reasonable request, but 589 00:56:18,300 --> 00:56:25,260 I hope that you maintain a relationship with your neighbor that you guys can work 590 00:56:25,260 --> 00:56:31,940 together on that and that they are being unruly, then I think there's probably a path I believe 591 00:56:31,940 --> 00:56:36,960 through the city that they would say, hey, you know, XYZ contractor is not abiding by the rules, 592 00:56:37,340 --> 00:56:42,860 but it's tough to us to make a finding to the point that the council may to put it into the resolution. 593 00:56:43,960 --> 00:56:51,760 But that's about it. No, I understand. It's hard to, everybody in the city kind of has to abide 594 00:56:51,760 --> 00:56:55,280 by it, but if they're not following the rules, there is a path. 595 00:56:55,840 --> 00:57:02,740 So, I just, you wrote a very good letter, AI or not answering some good questions that made me stop and think a little bit. 596 00:57:02,820 --> 00:57:05,880 And I think all of us kind of had to stop and think a little bit about that. 597 00:57:06,080 --> 00:57:09,600 So I do appreciate the effort and the fact that you came tonight too. 598 00:57:09,840 --> 00:57:10,420 So thank you. 599 00:57:12,510 --> 00:57:17,810 I find the building to be seen to be appropriate for that neighborhood. 600 00:57:17,810 --> 00:57:21,870 it is dense, it is tight, but that's a very common building 601 00:57:21,870 --> 00:57:24,950 typology, particularly there. Cardiff is full of that. 602 00:57:26,190 --> 00:57:29,750 It seems to me a lot of our concerns revolve around very 603 00:57:29,750 --> 00:57:33,790 technical aspects of the construction of it, and I think that's 604 00:57:33,790 --> 00:57:37,530 a different process. There's a building permit process in 605 00:57:37,530 --> 00:57:41,170 which engineers, ensuring contractors, everybody else, 606 00:57:41,370 --> 00:57:44,290 there's more to be done on that front. 607 00:57:44,290 --> 00:57:54,150 Regarding the neighbors concerns, I feel like a good number of those are addressed by city standards. 608 00:57:54,150 --> 00:58:04,350 There are noise ordinances, there are work operation ordinances, there are hours of operation and traffic plans to address this stuff. 609 00:58:05,510 --> 00:58:12,670 Parking is a concern, but it's a public street and workers have a right to park there as much as the beach goers. 610 00:58:12,670 --> 00:58:19,490 and that's going to be a momentary disruption to a house that will stand there for decades. 611 00:58:19,830 --> 00:58:22,530 And so I'm supportive of the project. 612 00:58:22,710 --> 00:58:28,890 Nothing about the height, the setbacks, the materiality of it gives me cause for concern. 613 00:58:29,030 --> 00:58:31,270 It seems like it's an appropriate house. 614 00:58:53,130 --> 00:59:00,670 So I think we've all expressed some general sympathy for some of this disruption, 615 00:59:00,670 --> 00:59:09,250 But no real opposition to the project, can I maybe have a motion? 616 00:59:11,970 --> 00:59:13,150 I'll move to approve. 617 00:59:14,150 --> 00:59:14,330 Okay. 618 00:59:14,350 --> 00:59:14,630 Second. 619 00:59:15,710 --> 00:59:16,270 Okay. 620 00:59:16,870 --> 00:59:17,870 Motion in a second. 621 00:59:17,990 --> 00:59:18,590 I'll call the vote. 622 00:59:28,210 --> 00:59:28,490 Okay. 623 00:59:29,030 --> 00:59:30,810 That passes 5-0. 624 00:59:31,210 --> 00:59:33,590 I look forward to seeing your house being built. 625 00:59:50,300 --> 00:59:50,580 Okay. 626 00:59:50,920 --> 00:59:52,940 Our next item tonight is. 627 00:59:53,620 --> 00:59:54,540 Help me here. 628 00:59:54,760 --> 00:59:55,500 Are we on 8-C? 629 00:59:55,960 --> 00:59:56,620 8-C. 630 00:59:56,620 --> 00:59:57,180 Sorry. 631 00:59:58,640 --> 00:59:59,960 The 20th. 632 01:00:00,000 --> 01:00:27,620 The second street, two unit development and ADUs, case number multi-008-111-2025. I'll start with any disclosures from commissioners tonight. Nothing to disclose. I drove by the site two days ago. I went by this afternoon, and I'm familiar with the site as well. 633 01:00:29,580 --> 01:00:35,780 Okay, with that, I will turn it over to Associate Planner Megan McElfish. 634 01:00:36,600 --> 01:00:37,920 Yep, thank you, Chair. 635 01:00:38,260 --> 01:00:39,360 Good evening, Planning Commissioners. 636 01:00:39,540 --> 01:00:44,480 My name is Megan McElfish, and tonight I'll be presenting item C, the Second Street, 637 01:00:44,680 --> 01:00:51,700 two unit development and ADU's project, under Multi-00811-2025. 638 01:00:53,700 --> 01:00:58,140 The project site is located at 858 Second Street in the Old Incidentities community. 639 01:00:58,140 --> 01:01:03,620 The site contains a vacant commercial building that was constructed in approximately 1947. 640 01:01:04,020 --> 01:01:11,040 The site has a general plan, land use designation of general commercial, is within the DCM2 zone 641 01:01:11,040 --> 01:01:15,700 of the downtown and state-specific plan and is located within the coastal overlay zone. 642 01:01:17,520 --> 01:01:23,060 The applicant requests approval of a tentative parcel map, minor use permit, design review permit, 643 01:01:23,400 --> 01:01:27,520 and coastal development permit to allow for the demolition of the existing commercial building 644 01:01:27,520 --> 01:01:34,980 and construction of a new two-story, two-unit residential building with two detached garages each with an ADU above. 645 01:01:35,740 --> 01:01:40,900 The project would result in two airspace condominium units on the existing parcel. 646 01:01:42,380 --> 01:01:44,540 Here is the project site plan. 647 01:01:45,100 --> 01:01:57,240 The project proposes a two-unit development consisting of 1,555 square foot unit with a 488 square foot two car garage and a 656 square foot ADU. 648 01:01:57,240 --> 01:02:06,220 a second 1,417 square foot unit with a 272 square foot, one car garage and a 656 square foot 649 01:02:06,220 --> 01:02:12,540 ADO. Access to the garages is proposed from the alley off of H Street. The site is also 650 01:02:12,540 --> 01:02:18,320 located within one half mile of the Ensigna station. Under assembly bill 2097 the city cannot 651 01:02:18,320 --> 01:02:23,380 require a minimum number of parking spaces for this project because of its proximity to a major 652 01:02:23,380 --> 01:02:27,900 transit stop. The applicant is proposing three enclosed parking spaces and one 653 01:02:27,900 --> 01:02:31,680 unclosed space for the two dwelling units. Because the project site is located 654 01:02:31,680 --> 01:02:36,260 within the coastal zone, it remains subject to the public access and recreation policies 655 01:02:36,660 --> 01:02:41,480 of the city's certified local coastal program. To comply with these policies, the applicant 656 01:02:41,480 --> 01:02:46,500 is required to install a bike rack within the public right of way at the corner of second 657 01:02:46,500 --> 01:02:51,960 and h street. For clarity, the bike rack is highlighted in orange on this slide and the one 658 01:02:51,960 --> 01:02:54,460 and enclosed parking space is identified in yellow. 659 01:02:56,920 --> 01:03:01,360 Here is the proposed north elevation with the eight use and garages shown on the right, 660 01:03:02,020 --> 01:03:03,600 and the two unit development on the left. 661 01:03:04,360 --> 01:03:09,660 The proposed material palette includes a white TPL membrane roof, gray CMU walls, any range 662 01:03:09,660 --> 01:03:15,840 of stucco finishes in white, warm gray, charcoal gray, and dark gray, along with steel guardrails. 663 01:03:16,440 --> 01:03:21,940 Overall, the project is consistent with the city's articulation, material, and color design 664 01:03:21,940 --> 01:03:27,540 matrix as well as the landscape design matrix as outlined in the city's design standards 665 01:03:27,540 --> 01:03:28,180 and guidelines. 666 01:03:30,450 --> 01:03:35,310 Here is the proposed south elevation as viewed from H Street. The proposed 667 01:03:35,310 --> 01:03:40,230 two unit development is two stories with a mezzanine while each ADU above the garage is one 668 01:03:40,230 --> 01:03:45,770 story with a mezzanine. The proposed flat roof height is 30 feet zero inches for the two unit 669 01:03:45,770 --> 01:03:51,090 development and 29 feet 9 inches for the ADUs, which both comply with the maximum permitted 670 01:03:51,090 --> 01:03:56,750 at height of 30 feet. A height certification will be required prior to the roof framing inspection. 671 01:03:58,940 --> 01:04:02,400 Here are the interior courtyard elevations and 672 01:04:05,060 --> 01:04:07,300 here are the front and rear elevations. 673 01:04:07,960 --> 01:04:12,820 The two unit development is shown on the left as viewed from second street and the AD and garage 674 01:04:12,820 --> 01:04:15,720 elevations are on the right as viewed from the alley. 675 01:04:19,230 --> 01:04:21,150 Here is the proposed landscape plan. 676 01:04:21,750 --> 01:04:25,770 The specific plan requires a minimum of 10 percent of the site to be landscaped. 677 01:04:25,770 --> 01:04:32,070 The project proposes 646 square feet of landscaped area or approximately 14% of the site. 678 01:04:32,350 --> 01:04:43,910 This includes a 433 square foot planting area and a 213 square feet of enhanced paving patio area which is allowed under the specific plan. 679 01:04:44,710 --> 01:04:54,710 The project also meets the design review landscape standards by providing 83% of the landscaped area with Southern California native species exceeding the 50% requirement. 680 01:04:54,710 --> 01:04:57,030 with no invasive species proposed. 681 01:04:57,730 --> 01:04:59,950 Two additional street trees are proposed while... 682 01:05:00,000 --> 01:05:02,760 No three existing street trees will be maintained. 683 01:05:06,660 --> 01:05:10,360 One CPP meeting, or ACPP meeting was held on December 684 01:05:10,360 --> 01:05:16,180 9th, 2025, from 6 p.m. to 7 p.m. at Ensenita City Hall. One member of the public attended 685 01:05:16,180 --> 01:05:20,500 the meeting. Questions were raised regarding the number of parking spaces provided for the 686 01:05:20,500 --> 01:05:25,200 new development and dust controlled during demolition and construction. The applicant clarified 687 01:05:25,200 --> 01:05:29,520 that four parking spaces will be provided even though parking is not required due to the 688 01:05:29,520 --> 01:05:32,020 site's proximity to the transit state center. 689 01:05:32,560 --> 01:05:36,940 The applicant also addressed dust-related concerns by confirming that proper dust control 690 01:05:36,940 --> 01:05:41,300 measures will be implemented during demolition and grading, and that efforts will be made 691 01:05:41,300 --> 01:05:44,200 to minimize construction impacts on the surrounding neighborhood. 692 01:05:44,900 --> 01:05:47,500 No concerns were identified that could not be addressed. 693 01:05:48,360 --> 01:05:53,420 Additionally, the public hearing notice was mailed on August 20th, 2026, to all property owners 694 01:05:53,420 --> 01:05:57,160 within 500 feet of the project site, and no comments were received. 695 01:05:58,440 --> 01:06:09,580 The project has been found to be exempt from environmental review, pursuant to Section 153-101-L3 and Section 153-303-B of the SQL guidelines. 696 01:06:10,320 --> 01:06:16,860 Section 153-101-L3 exempts the demolition and removal of individual small commercial structures. 697 01:06:17,400 --> 01:06:23,680 Section 153-303-B exempts the construction of a duplex or similar multi-family residential structure, 698 01:06:23,680 --> 01:06:26,060 or totally no more than four dwelling units 699 01:06:26,060 --> 01:06:29,160 or up to six dwelling units in an urbanized area. 700 01:06:29,880 --> 01:06:33,780 None of the exceptions in section 153-00.2 701 01:06:33,780 --> 01:06:35,640 of the secret guidelines exists 702 01:06:35,640 --> 01:06:38,480 and no historic resources will be impacted 703 01:06:38,480 --> 01:06:39,800 by the proposed development. 704 01:06:42,320 --> 01:06:44,040 Staff recommends that the Planning Commission 705 01:06:44,040 --> 01:06:47,180 adopt the draft resolution based upon 706 01:06:47,180 --> 01:06:48,600 the findings in the staff report. 707 01:06:49,160 --> 01:06:50,460 This concludes my presentation 708 01:06:50,460 --> 01:06:52,860 and the applicant and I are available for any questions. 709 01:06:52,860 --> 01:06:53,080 questions. 710 01:06:53,700 --> 01:06:54,260 Okay. 711 01:06:54,480 --> 01:06:55,100 Thank you very much. 712 01:06:55,900 --> 01:06:58,620 Are there any questions of the staff from the commission? 713 01:07:01,860 --> 01:07:02,500 I had a question. 714 01:07:03,830 --> 01:07:11,400 In one of the slides that you showed, it showed a picture of the ADUs over the garage, 715 01:07:12,040 --> 01:07:17,720 and I'm wondering, it looks like it canlevers out over the garage a bit. 716 01:07:19,760 --> 01:07:26,760 on which that one, does that encroach into any of the setbacks for the property? 717 01:07:27,980 --> 01:07:29,640 So it does. 718 01:07:29,880 --> 01:07:30,640 I have a slide. 719 01:07:30,960 --> 01:07:31,060 Let me. 720 01:07:37,380 --> 01:07:37,700 This one. 721 01:07:51,100 --> 01:07:51,480 Sorry. 722 01:07:55,780 --> 01:07:58,860 I have it to show that now that 723 01:08:02,610 --> 01:08:03,330 Ray's slide, Jack. 724 01:08:03,570 --> 01:08:05,390 Sorry for the technical difficulties. 725 01:08:05,590 --> 01:08:08,390 So here's the architectural projection roof plan. 726 01:08:08,390 --> 01:08:16,250 So, these are the ADU projections that you were referencing, so they do encroach 5 feet 727 01:08:16,250 --> 01:08:22,410 into the required 10 foot rear yard setback, but under the specific plan they're permitted 728 01:08:22,410 --> 01:08:31,270 to go 3 feet from the center line of the alley, so they technically could go all the way 729 01:08:31,270 --> 01:08:36,770 to the property line under the specific plan, but they are encroaching 5 feet into the required 730 01:08:36,770 --> 01:08:37,230 setback. 731 01:08:48,140 --> 01:08:53,040 So, under the specific plan, they allow, it's 732 01:08:59,050 --> 01:09:12,210 the minimum separation distance between the center line of the street, or the closest interior lot line, so three feet is required, or three feet of separation is required from that center line of the street. 733 01:09:12,210 --> 01:09:18,830 So the center, the alleys technically 20 feet wide, so they exceed that 3 feet minimum. 734 01:09:21,340 --> 01:09:21,860 So 735 01:09:38,270 --> 01:09:43,170 the separation from the center line of the street to the property line is 3 feet 736 01:09:43,170 --> 01:09:43,870 that's required. 737 01:09:44,450 --> 01:09:48,650 They're not touching the property line, so yes, they are encroaching into the setback, 738 01:09:48,810 --> 01:09:52,970 but they're not exceeding that 3 feet from the center line of the street. 739 01:09:53,030 --> 01:09:57,990 Could we clarify that they're, I believe an ADU has a 4 foot rear yard setback. 740 01:09:57,990 --> 01:09:59,790 and so for the ADU itself. 741 01:10:00,000 --> 01:10:12,860 They're not encroaching on anything, right? The 10-foot setback I believe you're referencing is the underlying zone for the primary structure, but the ADU itself has a four-foot setback side 742 01:10:18,680 --> 01:10:19,080 and rear. 743 01:10:21,290 --> 01:10:36,790 So, do you want to clarify? So, for height purposes, for the ADU to go to the underlying zone limit of 30 feet, they have to meet the setbacks of the zone. So, that's why the ADU is at a 10-foot setback. 744 01:10:36,790 --> 01:10:39,930 instead of the 4-foot setback so they can go up to 30 feet. 745 01:10:41,290 --> 01:10:45,050 What would be their height limit if they use the 4-foot? 746 01:10:45,310 --> 01:10:46,790 I believe it'd be 18 feet. 747 01:10:57,090 --> 01:10:57,370 Thank you. 748 01:10:57,650 --> 01:10:57,970 Thank you. 749 01:11:02,280 --> 01:11:03,140 Any other questions? 750 01:11:03,420 --> 01:11:04,020 Commissioner Whitaker? 751 01:11:04,320 --> 01:11:04,420 Sure. 752 01:11:05,180 --> 01:11:06,360 I can jump in here. 753 01:11:07,280 --> 01:11:14,900 I wanted to ask about what we discussed during our briefing regarding the goals and objectives 754 01:11:14,900 --> 01:11:17,320 is for solar and water conservation. 755 01:11:17,960 --> 01:11:19,380 And I was just interested to know, 756 01:11:19,660 --> 01:11:24,900 like, although they're being required to install 757 01:11:25,400 --> 01:11:29,420 the wiring for that and the piping for the gray water, 758 01:11:30,480 --> 01:11:33,080 it's to me somewhat understandable 759 01:11:33,080 --> 01:11:35,800 to not necessarily have to connect to a gray water system 760 01:11:35,800 --> 01:11:37,820 that doesn't yet exist within that area. 761 01:11:38,340 --> 01:11:43,120 But the solar, I'm not quite sure I understand why 762 01:11:43,120 --> 01:11:45,240 and are not being required to install the solar. 763 01:11:45,740 --> 01:11:51,460 So they will be required at the time of building permits in middle for the eight use and for the two units. 764 01:11:51,880 --> 01:11:53,500 Okay, thank you. 765 01:11:56,120 --> 01:12:06,540 Page 17, the roof plan, is there a shared roof between the two units because I thought they were separate units. 766 01:12:07,920 --> 01:12:15,180 So there's a separation between the eight use and garages and the two units, but the two main units are 767 01:12:15,180 --> 01:12:22,060 connected. Okay, I see it now. Are there any utilities on the roof, any cooling 768 01:12:22,060 --> 01:12:30,680 towers or anything like that? Not that I'm aware of. Okay, and we also discussed 769 01:12:30,680 --> 01:12:36,260 today in a briefing about the existing trees on second avenue that will 770 01:12:36,260 --> 01:12:43,000 not be removed. What trees with those again? The one on second street is a 771 01:12:43,000 --> 01:12:49,420 camp for tree that was proposed to remain and then there's two paper bark trees on each street that will remain. 772 01:12:50,060 --> 01:12:50,920 Okay, thank you. 773 01:12:55,640 --> 01:12:59,980 I think we talked about this during the briefing a little bit. 774 01:13:00,200 --> 01:13:03,760 So these are going to be two separate condominiums. 775 01:13:04,600 --> 01:13:16,360 And so the main structure with the ADU is one condominium property and the second mirror image is the second condominium property. 776 01:13:16,360 --> 01:13:25,100 I wanted to clarify, does that count in according to our incinitis municipal code as a multi-family 777 01:13:25,100 --> 01:13:33,240 resident and as such, those ADUs nor the condos would be suitable or allowed to operate 778 01:13:33,240 --> 01:13:34,340 a short-term rentals? 779 01:13:34,940 --> 01:13:41,660 So under state ADU law it is considered a multi-family development because the two units are attached 780 01:13:41,660 --> 01:13:42,240 to each other. 781 01:13:42,240 --> 01:13:55,180 So they're allotted up to two detached ADUs, but the ADUs will be required to sign a covenant at the time of building permit or prior to building permit issuance that limits them to rentals of 30 days or more so they're not. 782 01:13:55,520 --> 01:13:58,460 No weekend rentals would not for the ADUs. 783 01:13:58,640 --> 01:14:01,940 Okay. Would they be allowed on further condominiums in the front? 784 01:14:02,420 --> 01:14:02,760 Yes. 785 01:14:02,760 --> 01:14:03,740 No. 786 01:14:12,290 --> 01:14:13,050 Let's see. 787 01:14:16,720 --> 01:14:22,160 So the ADUs, so what is the F, the total FAR? What is the density allowable 788 01:14:22,160 --> 01:14:24,980 under the code and how much are they using? 789 01:14:28,670 --> 01:14:29,230 And 790 01:14:33,680 --> 01:14:35,620 if there was in the report that I apologized, 791 01:14:35,900 --> 01:14:44,640 maybe there was a bullet somewhere. So the allowable FAR under the code is 0.65 and they're proposing 792 01:14:44,640 --> 01:14:53,980 16.64. Okay. Squeezing it in. And the ADU's are a part of that calculation. They're 793 01:14:53,980 --> 01:14:59,540 exempt of the 800 square feet of each ADU exempt from. It's one of about 460. 794 01:15:00,000 --> 01:15:02,720 There are 6.56. Okay. 795 01:15:05,000 --> 01:15:12,000 Let's see. There are some boxes that we're not checked off in the 796 01:15:12,000 --> 01:15:17,500 submittal. Let me get to those. That's on page 10 797 01:15:19,800 --> 01:15:22,880 of the staff report. A lot 798 01:15:22,880 --> 01:15:28,260 coverage, it's 75%. It doesn't say a box yes or no. Floor air ratio, 0.65. 799 01:15:31,680 --> 01:15:32,280 That's 800 01:15:32,280 --> 01:15:35,480 That's not checked, neither is the landscaping minimum of 10%. 801 01:15:35,480 --> 01:15:38,600 So will that eventually, will that get cleaned up? 802 01:15:38,860 --> 01:15:40,860 Yes, I apologize, not just a typo. 803 01:15:40,920 --> 01:15:42,560 They do comply with all the standards. 804 01:15:42,560 --> 01:15:43,880 They do comply, what's good to know. 805 01:15:44,140 --> 01:15:44,560 All right, thank you. 806 01:15:46,980 --> 01:15:52,380 There's a reference on page 11 of 97 of the PDF 807 01:15:53,080 --> 01:15:54,660 under minor use permit. 808 01:15:56,060 --> 01:15:59,600 It says therefore the approval of the proposed project 809 01:15:59,600 --> 01:16:01,820 would remain below the code's maximum allowance 810 01:16:01,820 --> 01:16:05,280 So it's a 25% residential only acreage within the zone. 811 01:16:06,300 --> 01:16:11,800 So is there a, like a table, a running table? 812 01:16:12,620 --> 01:16:16,400 So if I come in, let's just say I own the property next door. 813 01:16:16,840 --> 01:16:21,060 And the 25% residential only acreage has already been achieved. 814 01:16:22,250 --> 01:16:24,160 Is anybody else allowed to do residential? 815 01:16:24,720 --> 01:16:31,800 So on this slide, I pulled up a table that shows all of the properties that are currently residential only. 816 01:16:32,380 --> 01:16:38,880 So the next seminal that will come in, they'll use this table and if this project's approved, it will be added as well. 817 01:16:39,740 --> 01:16:46,660 Right, so quick summary, how far along are we to the 25% is that say 10% on the bottom right hand? 818 01:16:46,960 --> 01:16:48,900 Yeah, 98%. 819 01:16:48,900 --> 01:16:52,300 Perfect, thank you. That's a very good slide. Good reference. 820 01:16:52,840 --> 01:17:01,340 So just to play that out, if you are the five more developers go residential and that moves to 25% and you're the sixth person that come in, 821 01:17:01,340 --> 01:17:04,080 and you're out of luck, you don't get to do residential. 822 01:17:04,700 --> 01:17:06,740 Correct, residential only, what do you do? 823 01:17:07,040 --> 01:17:08,100 Yes, right, right, okay. 824 01:17:08,900 --> 01:17:11,140 Well, you can do an ADU because that's exact, no, I'm just gonna say. 825 01:17:14,440 --> 01:17:16,900 So they're coming in as a condominium 826 01:17:16,900 --> 01:17:22,040 and they're not using SB9 as an urban lot split for this process, right? 827 01:17:22,420 --> 01:17:24,840 They're just coming in under a condominium, okay? 828 01:17:28,540 --> 01:17:30,860 That's all I have, okay, thank you. 829 01:17:30,860 --> 01:17:36,680 thank you Megan. I believe the applicant is here. Would you like to address the commission? 830 01:17:39,800 --> 01:17:45,860 Okay, applicants is here. If there's any questions, are there any questions? Okay, are there any 831 01:17:45,860 --> 01:17:52,040 public speakers? Okay. Seeing none, we'll close the public comment and open it to Commissioner 832 01:17:52,040 --> 01:18:01,940 Deliberation. Anybody want to start this off? I'll jump in here. So yeah, again initially I thought 833 01:18:01,940 --> 01:18:06,880 this fit well within that particular area. I was interesting to see that it was the first 834 01:18:06,880 --> 01:18:15,700 one we had that I had seen that used the mezzanine interior to create a, a, the ability to do 835 01:18:15,700 --> 01:18:21,540 height, you know, go higher. Yeah, that was quite interesting and, uh, in development. But, 836 01:18:23,040 --> 01:18:29,320 in general, I thought that there was, uh, well within the, um, the developments within that area 837 01:18:29,320 --> 01:18:35,120 in the types of units we see going up in that area so I'm supportive. I didn't have 838 01:18:35,120 --> 01:18:43,600 any specific concerns and I was happy to see the level of landscaping that was being 839 01:18:43,600 --> 01:18:50,020 provided was adequate in that type of thing so. Okay thank you. Any other comments? 840 01:18:50,980 --> 01:18:58,120 I do. Like Commissioner Whitaker it seems comparable to a lot of the development that's been 841 01:18:58,120 --> 01:19:04,000 done over the last 10 years or so in that area. I do appreciate the parking that was put in. 842 01:19:05,120 --> 01:19:09,260 I know, you know, regulations sometimes say you don't have to, well, it's often say they don't have 843 01:19:09,260 --> 01:19:15,180 to, but I appreciate that the applicant did put parking in so that there is some off-street parking 844 01:19:15,180 --> 01:19:22,580 for whoever ultimately owns those. With regards to my earlier comment about short-term rental 845 01:19:22,580 --> 01:19:30,040 requirements as these become I guess have to file a covenant in the way she just 846 01:19:30,040 --> 01:19:38,560 may describe it when the HOA documents are put together is it are we able to 847 01:19:38,560 --> 01:19:42,820 condition that we'd like a called out that unit insinious municipal code doesn't 848 01:19:42,820 --> 01:19:49,820 allow short-term rentals in the the ADU unit so that whoever is purchasing them 849 01:19:49,820 --> 01:19:54,620 understands what methods they can operate those if they don't intend to live in 850 01:19:54,620 --> 01:19:58,860 them full-time. I guess the question for our legal 851 01:20:02,030 --> 01:20:09,670 Putting that statement where? I don't know if there's a way to condition that when, so from my 852 01:20:09,670 --> 01:20:15,590 finder's stand from Megan, the condos, the main units can be a short-term rental, but the 853 01:20:15,590 --> 01:20:22,490 ADUs cannot. They can, they have a 30-day minimum on the rental, if they are, and is there 854 01:20:22,490 --> 01:20:30,210 a way to condition the approval or to request that when those are, as assume, put up for sale 855 01:20:30,210 --> 01:20:33,750 that that's documented that that is a current requirement for the city. 856 01:20:35,670 --> 01:20:39,110 Yeah, it's already a covenant on, it's on the property, right? 857 01:20:40,550 --> 01:20:45,810 Yeah, so the covenant is placed on the title of the property, similar to kind of HOA documents. 858 01:20:46,230 --> 01:20:51,230 So that's kind of the mechanism that we control, kind of no short temperamentals within the ADUs. 859 01:20:52,550 --> 01:20:56,750 Presumably, if you get your title report when you buy this thing, it would say here a list of 860 01:20:56,750 --> 01:20:59,810 easements or covenants recorded against this property? 861 01:20:59,830 --> 01:21:01,170 Product and can we put it? 862 01:21:01,290 --> 01:21:03,170 Well, I'm just saying, I just want to confirm 863 01:21:03,170 --> 01:21:04,310 that is recorded somewhere. 864 01:21:05,510 --> 01:21:07,150 HOA doc, I mean, this is new. 865 01:21:07,250 --> 01:21:09,010 So obviously whatever document is created 866 01:21:09,010 --> 01:21:10,430 will be new and current at the time. 867 01:21:11,210 --> 01:21:14,850 HOA documents don't often get updated once they get put together. 868 01:21:15,110 --> 01:21:19,130 And so I'm just trying to think about for the future 869 01:21:19,130 --> 01:21:23,030 that at least the state of what was required with these 870 01:21:23,030 --> 01:21:26,710 were built and eventually sold is documented. 871 01:21:29,400 --> 01:21:34,200 And also from the, you know, I think that realistically these will be very popular for short-term 872 01:21:34,200 --> 01:21:34,620 rentals. 873 01:21:35,280 --> 01:21:39,720 This is a great location, I mean if I was going to go rent somewhere for a beach vacation 874 01:21:39,720 --> 01:21:44,500 I would, but if it's not allowed, I think we need to be clear that it's not allowed. 875 01:21:47,390 --> 01:21:52,290 That's my only comment, otherwise the project seems to fit the neighborhood. 876 01:21:52,290 --> 01:22:04,330 Good, there are fair amount of trees and I'm happy to see that the old trees are being preserved which is great for the community character so I don't have any issues with the development as it is. 877 01:22:06,450 --> 01:22:18,690 Any comments? I think, you know, I applaud you for a white roof. We haven't had too many people do the white roof and that does kick in a lot of different things for the climate action plan and, you know, the fact that Commissioner Grinderger brought up the solar. 878 01:22:18,690 --> 01:22:24,890 or also one will applaud the fact that you're doing 83% natives, and you only have to do 50. 879 01:22:25,010 --> 01:22:27,270 The last applicant came in and only did the minimum. 880 01:22:27,770 --> 01:22:33,670 I don't know why you would do less than that because it is a drought-prone area, maybe not this year. 881 01:22:33,790 --> 01:22:38,950 But historically, we're a pretty dry place, so thank you for exceeding the minimums. 882 01:22:39,050 --> 01:22:41,010 I appreciate that a lot. 883 01:22:42,150 --> 01:22:47,270 Also, we talked about, we've already passed the urban forest codes and 884 01:22:47,270 --> 01:22:50,610 things of keeping the extra trees and finding room for them on your site. 885 01:22:51,150 --> 01:23:07,550 Other projects have come before us and found a raise not to put trees on their site on El Camino Real and some other places, so they asked for waivers to do that and you did not, so I applaud you for doing the best you can under the site that you have and doing more than what the code is asking for. 886 01:23:08,190 --> 01:23:16,350 I do think that it does fit the neighborhood and I would support the project and I appreciate you guys coming in and putting something like this before us. 887 01:23:18,950 --> 01:23:29,270 Okay. I also support the project. I think it's a nice design and it's a neat concept of putting in a number of units in a tight space. 888 01:23:29,450 --> 01:23:38,730 But I feel like the space between the ADUs and the main houses kind of creates a little more air and light that filters in throughout the project. 889 01:23:38,730 --> 01:23:48,510 So I like the project, and I would support it tonight to loop back Commissioner Kimbell's concern about HOAs and the covenants. 890 01:23:48,650 --> 01:23:59,230 I don't share the same concern only that I think that is a state rule, it will be conditioned that way when it's approved, they have to submit the covenant. 891 01:23:59,590 --> 01:24:05,490 And I feel like it's a little beyond our purview to make sure that they communicate that when they sell it. 892 01:24:05,490 --> 01:24:10,910 whether they communicated or not, doesn't change the fact that it is a recorded covenant against the property. 893 01:24:12,450 --> 01:24:19,850 And someone that does buy it, presumably gets a title report that tells them what kind of restrictions are on thing. 894 01:24:20,210 --> 01:24:28,250 And if they wanted to, I mean, someone can always break the law and rent it without notifying the city, but 895 01:24:28,890 --> 01:24:33,230 we can't control that behavior either, or we can enforce it after that. 896 01:24:34,050 --> 01:24:42,550 So the question council, I have to follow up on both Commissioner Adolten and Kimball is all right. 897 01:24:44,730 --> 01:24:50,730 We, the rules are, the state laws are that they can't do an ADU for short term rentals. 898 01:24:50,830 --> 01:24:51,750 That's just a law. 899 01:24:52,270 --> 01:24:59,810 But an HOA is a private covenant on private property, and it has to follow the laws, but do you 900 01:24:59,810 --> 01:24:59,850 You 901 01:25:00,020 --> 01:25:18,980 We have to explicitly state things that are already stated in the state law. In other words, you have to reiterate some of that. Or is it to Commissioner Adolph as a position that it's there so you don't have to restate it? Which one is it? 902 01:25:20,560 --> 01:25:24,660 Yeah, so the HOA is the owners association, 903 01:25:29,060 --> 01:25:33,220 the CCNRs are the, it's an agreement amongst 904 01:25:33,220 --> 01:25:39,140 all of the owners at the, or the developer at the time of subdividing, right? 905 01:25:42,400 --> 01:25:48,900 As Mr. Manard has been telling me, there might not be an HOA per se, but there would still 906 01:25:48,900 --> 01:25:52,980 will be covenants placed on the property at time of subdivision. 907 01:25:55,800 --> 01:26:01,460 Your approval has a requirement that certain items be in the covenant. 908 01:26:02,780 --> 01:26:10,360 To your point, do the laws that are applicable to this particular topic need to be placed in there? 909 01:26:10,360 --> 01:26:17,900 no, that state law exists, but that state law could change. 910 01:26:19,180 --> 01:26:33,000 So if what you want is this to have that state law, in a fact, and the reason why you're 911 01:26:33,000 --> 01:26:41,000 approving it is because of an issue like no long term rental or no short term rental or 912 01:26:41,000 --> 01:26:44,860 particular unit that's right now it's covered by state law but who knows it could happen in the future. 913 01:26:45,720 --> 01:26:50,760 That state law that code section could be removed and then it would not be enforceable 914 01:26:51,780 --> 01:26:54,960 unless you had it in your covenant. 915 01:26:56,260 --> 01:27:01,660 But if it's removed from state law it's unenforceable so it's not voidable but it's 916 01:27:01,660 --> 01:27:07,420 it's it's even though if it's in the specific covenant it's not an enforceable 917 01:27:07,420 --> 01:27:20,760 That's my point is that if you're relying on state law you're not going to have it in the approvals and you're saying state law has it covered and state law changes it well then you can't impose it. 918 01:27:21,500 --> 01:27:29,960 But if you impose it and state law is there now you have you have imposed it state law goes away. 919 01:27:29,960 --> 01:27:32,500 a year in position of that still remains. 920 01:27:34,720 --> 01:27:37,160 State law, you have not preempted, 921 01:27:37,160 --> 01:27:38,860 you're not preempted by doing that. 922 01:27:39,040 --> 01:27:39,980 It exists currently. 923 01:27:40,680 --> 01:27:42,660 State law, then in the future changes, 924 01:27:42,920 --> 01:27:44,060 it would remain on this. 925 01:27:48,090 --> 01:27:48,350 Okay. 926 01:27:48,730 --> 01:27:51,190 In that scenario in my mind, if the state law changes 927 01:27:51,190 --> 01:27:52,990 and we have relied on the state law 928 01:27:52,990 --> 01:27:54,990 to prevent this activity, 929 01:27:56,150 --> 01:27:59,390 I feel like that is a policy decision of the council 930 01:27:59,390 --> 01:28:02,150 to decide whether we would create a local ordinance 931 01:28:02,150 --> 01:28:08,710 to restrict short-term rentals, if there's not already a local ordinance that restricts rentals. 932 01:28:08,910 --> 01:28:13,530 I know that there's a short-term rental policy that limits X number of percentage of the units, 933 01:28:14,010 --> 01:28:16,610 assuming that people apply for a permit, right? 934 01:28:17,050 --> 01:28:22,870 We debated that, and I think we passed an ordinance a few years ago, and it was not in this 935 01:28:22,870 --> 01:28:22,990 hex. 936 01:28:22,990 --> 01:28:27,030 I remember going back through and negotiating the percentages or discussing the percentages 937 01:28:27,030 --> 01:28:28,490 of how many units were applied. 938 01:28:28,490 --> 01:28:33,230 So could you, I see Megan leaning in, could you guys refresh us to kind of where we are with that? 939 01:28:33,530 --> 01:28:35,010 Just to add back to the. 940 01:28:35,670 --> 01:28:42,290 Unfortunately, that specific ordinance, we did take it to the California Coastal Commission as part of our local coastal program amendment. 941 01:28:42,990 --> 01:28:48,210 Coastal Commission did approve that with a change to requiring a minimum night's day. 942 01:28:48,650 --> 01:28:50,710 And it's a reduction from what we currently have. 943 01:28:50,830 --> 01:28:53,510 So when it went back to city council, that was denied. 944 01:28:53,510 --> 01:28:58,890 So that ordinance related to the percentages is actually not applicable at this time. 945 01:28:59,370 --> 01:29:04,090 There are limitations related to what can be a short-term rental versus what can't be a short-term rental. 946 01:29:04,590 --> 01:29:07,810 It's limited to single-family or two-family residences. 947 01:29:08,330 --> 01:29:11,730 And there are a number of requirements and inspections that need to go through it. 948 01:29:12,010 --> 01:29:15,650 However, the percentage cap is not currently in place. 949 01:29:18,700 --> 01:29:23,640 my intent with the question was not to impose additional requirements over what 950 01:29:23,640 --> 01:29:28,960 exists in state law or municipal code was just to make sure and it sounds like 951 01:29:28,960 --> 01:29:36,980 from what was said earlier that when it's in the covenant it will spell out what 952 01:29:36,980 --> 01:29:42,760 the requirements are and as long as that's documented that's adequate I just 953 01:29:42,760 --> 01:29:47,200 want to make sure that there is some traceability that at the time this is 954 01:29:47,200 --> 01:29:53,280 the municipal code and the rule and that that's documented that this is subject to it. 955 01:29:54,820 --> 01:29:57,000 I can't predict what will happen in 20 years. 956 01:29:57,080 --> 01:29:57,420 No, no. 957 01:29:57,480 --> 01:29:57,860 Not sure. 958 01:29:57,860 --> 01:29:58,840 No, this can. 959 01:30:00,000 --> 01:30:29,440 I hear them chattering, but I think there is a standard covenant that the city enforces, and that's what's required. If I may, um, senior planner, Christina Bustamonte, if I can help with this question a little bit. So I hear your conversation. I hear your concern that, hey, I want to make sure that future owners know that this rule is in place that it's written down somewhere, and it's going to be on the property and perpetuity. Our standard process is we today are going to create a 960 01:30:29,440 --> 01:30:35,060 a resolution that's going to go with the condition of approval, with that has several conditions 961 01:30:35,660 --> 01:30:41,260 for this particular question that you have. We have 80U01, which is a standard condition 962 01:30:41,260 --> 01:30:49,260 for us that limits the accessory dwelling units to 30-day rental periods. It can be less 963 01:30:49,260 --> 01:30:54,000 than that. It can be more than that, but it can't be less than that. And so that resolution 964 01:30:54,000 --> 01:30:57,480 is going to get coupled with a covenant. 965 01:30:58,520 --> 01:31:00,740 So the covenant essentially is a real property covenant. 966 01:31:00,960 --> 01:31:03,440 It describes the permits that were placed 967 01:31:03,440 --> 01:31:04,640 for this particular property. 968 01:31:05,240 --> 01:31:07,180 As an exhibit, that's an attachment 969 01:31:07,180 --> 01:31:10,140 that will get placed with it, is the resolution. 970 01:31:10,920 --> 01:31:13,040 So that resolution will get coupled altogether. 971 01:31:13,380 --> 01:31:14,580 All of the conditions of approval, 972 01:31:14,780 --> 01:31:17,780 all of the tax from it will be all included. 973 01:31:17,780 --> 01:31:21,720 And then that gets recorded as a document against the property. 974 01:31:21,720 --> 01:31:26,760 So unless somebody rescinds it, that will be their imperpetuity. 975 01:31:27,040 --> 01:31:27,620 Does that help? 976 01:31:28,280 --> 01:31:29,680 That answers it perfectly. 977 01:31:30,200 --> 01:31:30,500 Thank you. 978 01:31:30,960 --> 01:31:31,180 Welcome. 979 01:31:32,820 --> 01:31:33,160 Okay. 980 01:31:33,880 --> 01:31:34,160 Okay. 981 01:31:34,960 --> 01:31:35,220 For staff. 982 01:31:35,440 --> 01:31:37,240 So a quick nuance on that item. 983 01:31:37,660 --> 01:31:42,340 So 80-01 does require that we do that covenant recordation. 984 01:31:43,340 --> 01:31:48,100 So that is something that we would do in the standard language that we have in a covenant 985 01:31:48,100 --> 01:31:53,060 that we utilizes, requires that 30-day minimum consistent with state law. 986 01:31:53,560 --> 01:31:56,460 That explicit language isn't in ADU01. 987 01:31:56,940 --> 01:32:00,620 If you would like to amend that condition of approval with this resolution, 988 01:32:00,840 --> 01:32:03,580 you could make that amendment for that language to be more explicit. 989 01:32:04,220 --> 01:32:09,300 But as Senior Planner Bustamante just stated, that condition is in the covenant, 990 01:32:09,620 --> 01:32:14,960 and that language is explicitly stated in that, and that would be recorded with the title. 991 01:32:14,960 --> 01:32:24,240 Well, also just to identify in chapter 30 point or 30 point 48 we are a covenant section within our local code. 992 01:32:24,640 --> 01:32:28,660 It also has a provision in terms of the rentals no more less than 30 days. 993 01:32:29,400 --> 01:32:33,260 It's also in the local code in addition to state law or in my provision. 994 01:32:38,260 --> 01:32:38,960 Bob, you had a question. 995 01:32:39,280 --> 01:32:45,880 Yeah, I had one more question for staff on let's see. 996 01:32:45,880 --> 01:32:58,760 on page 12 of 97 of the staff report. Under section, under EMC section 30.48.040.15, 997 01:32:59,800 --> 01:33:04,100 80 use are not required to additional parking and floated within 1.5 mile of a major transit stop. 998 01:33:04,780 --> 01:33:07,640 This project is located 1.5 mile of the incident station. 999 01:33:07,640 --> 01:33:18,960 So, under SB, it's 79, in terms of a TOD, they measure it by not a concentric circle, but a walking distance. 1000 01:33:19,340 --> 01:33:22,620 So, it's really, he's providing the parking, so it's really not a question for that. 1001 01:33:22,720 --> 01:33:25,320 It's really more of the question of, how did you make that statement? 1002 01:33:25,480 --> 01:33:30,140 Was it walking 90 feet, then turning left 90 feet, then going 90 feet? 1003 01:33:30,200 --> 01:33:34,120 Or did you use a concentric circle measurement for that statement? 1004 01:33:34,120 --> 01:33:36,200 So we have 1005 01:33:41,100 --> 01:33:55,640 it might come up on other TODs. That's why so for AB 2097 it is a half mile walk to the transit station. So this little dot right here is the property. And then the purple is and 1006 01:33:55,640 --> 01:34:08,740 needed a station and then separately under state law the ADU just needs to be within a half mile walking distance of a transit stop. Not necessarily a major transit stop. 1007 01:34:08,740 --> 01:34:12,280 and the closest bus stop is on H and 101. 1008 01:34:12,940 --> 01:34:15,260 So it doesn't have to be, there's been a lot 1009 01:34:15,260 --> 01:34:18,620 of controversy over, not controversy, a lot of discussions 1010 01:34:18,620 --> 01:34:22,440 over what defines a transit stop in terms of the frequency 1011 01:34:22,440 --> 01:34:26,320 of the bus stops because this comes up in other places. 1012 01:34:27,560 --> 01:34:30,400 So this qualifies obviously for the direction 1013 01:34:30,400 --> 01:34:32,300 of the bus stop, it sounds like it qualifies 1014 01:34:32,300 --> 01:34:34,880 from the locking distance that you measured. 1015 01:34:35,080 --> 01:34:36,400 It wasn't a concentric circle. 1016 01:34:37,420 --> 01:34:50,100 And is the, can you just help me understand what the frequency, what defines then the transit stop, maybe not for this project, but going forward, it's just a note defile for me. 1017 01:34:51,240 --> 01:34:59,900 Is it have to be because this comes up under the potential development areas around the train station and around a transit stop. 1018 01:35:00,000 --> 01:35:10,640 In terms of height and certain state laws that are before us. So the bus stop, does that mean it's like sevens, the level of service qualifies? 1019 01:35:16,460 --> 01:35:34,280 Let me jump in first. This is very complex. In very coming on now. If it really matters, if it really matters for your approval, absolutely, we can answer the question. No, I'll have a sidebar at another time. Yeah, 1020 01:35:34,280 --> 01:35:41,240 Yeah, just to answer your question, there are several different statutes, each with terms 1021 01:35:41,240 --> 01:35:49,520 that sound similar, transit stop, major transit stop, high frequency railways, all of these 1022 01:35:49,520 --> 01:35:57,320 different things that are layered that really are loaded words and get very complicated 1023 01:35:57,320 --> 01:36:03,960 very quickly and people use them kind of interchangeably and get confused by them and so I'd be 1024 01:36:03,960 --> 01:36:07,780 He really has an int that we any one of us really start talking definitively right now 1025 01:36:07,780 --> 01:36:10,480 about it unless it's something you absolutely need for this. 1026 01:36:10,580 --> 01:36:14,520 No, I think the answer is they measured it by a walking distance and it qualifies to 1027 01:36:14,520 --> 01:36:17,520 the bus stop in the train station plus it doesn't really matter because he's got the extra 1028 01:36:17,520 --> 01:36:17,840 parking. 1029 01:36:17,920 --> 01:36:23,000 And it looks like they have a map that shows that in the red blue or the one that's on the 1030 01:36:23,000 --> 01:36:23,200 screen. 1031 01:36:23,440 --> 01:36:23,680 Exactly. 1032 01:36:23,920 --> 01:36:24,000 Yeah. 1033 01:36:24,600 --> 01:36:25,240 Answer my question. 1034 01:36:25,500 --> 01:36:25,780 Great. 1035 01:36:27,040 --> 01:36:29,400 I'm going to make a motion that we approve the project. 1036 01:36:29,980 --> 01:36:30,800 I'll second that. 1037 01:36:32,960 --> 01:36:33,140 Okay. 1038 01:36:33,140 --> 01:36:33,720 I'll call the vote. 1039 01:36:33,720 --> 01:36:34,520 Okay. 1040 01:36:39,800 --> 01:36:41,820 Sorry to put you through that. I had to approve 5-0. 1041 01:36:55,480 --> 01:37:00,520 Okay. The next item is I usually 1042 01:37:00,520 --> 01:37:06,940 take a break if we get to 8 o'clock. Is everybody okay to finish this last one? Yeah. Okay. 1043 01:37:07,980 --> 01:37:17,760 Item 8-D, the Brooks Residence Case Number Multi-007-164-2024. Are there any commission 1044 01:37:17,760 --> 01:37:20,800 and disclosures, 1045 01:37:22,980 --> 01:37:23,620 thank you. 1046 01:37:24,700 --> 01:37:27,360 I've walked by there before, not recently. 1047 01:37:28,000 --> 01:37:29,100 Okay, nothing to disclose. 1048 01:37:29,920 --> 01:37:30,100 Nothing. 1049 01:37:30,580 --> 01:37:30,760 Nothing. 1050 01:37:31,240 --> 01:37:34,320 All right, Christina Bustamonte, 1051 01:37:34,560 --> 01:37:35,760 this is a big night for you, 1052 01:37:37,380 --> 01:37:39,900 is our staff senior planner 1053 01:37:39,900 --> 01:37:41,620 and she's gonna present the case. 1054 01:37:43,740 --> 01:37:45,560 Good evening commissioners, members of the public. 1055 01:37:45,560 --> 01:37:46,840 My name is Christina Bustamonte. 1056 01:37:47,000 --> 01:37:49,000 I'm a senior planner and I'll be presenting 1057 01:37:49,000 --> 01:37:53,400 this project this evening. The project is for a design review permit and 1058 01:37:53,400 --> 01:37:58,940 costot development permit to construct a 5,943 square foot single family single 1059 01:37:58,940 --> 01:38:05,060 residents with an attached 899 square foot three car garage and a 1060 01:38:05,060 --> 01:38:12,000 detached 1,136 square foot one bedroom one bathroom accessory dwelling unit on a 1061 01:38:12,000 --> 01:38:17,020 vacant lot. The project includes encroachment into steep slopes and grading that 1062 01:38:17,020 --> 01:38:22,780 That is eight vertical fee or less of cut and two vertical fee of fill. 1063 01:38:23,380 --> 01:38:25,580 The project is currently vacant. 1064 01:38:25,960 --> 01:38:30,160 The Planning Commission shall be the authorized agency for reviewing and 1065 01:38:30,160 --> 01:38:36,420 granting discretionary approvals for proposed development within the hillside inland bluff overlay zone. 1066 01:38:37,260 --> 01:38:45,660 The site slopes downward from west to east with steep slopes of greater than 25% grade at the east of the half of the parcel. 1067 01:38:47,620 --> 01:38:52,320 I just heard the buzz, like, oh, yep, that's for me. 1068 01:38:53,600 --> 01:38:55,320 Back to the sentence I was in. 1069 01:38:55,740 --> 01:38:56,660 Thank you for letting me know. 1070 01:38:56,860 --> 01:38:58,700 I wasn't presenting my presentation. 1071 01:38:59,660 --> 01:39:05,880 The site slopes downward from west to east with steep slopes of greater than 25% gradient 1072 01:39:05,880 --> 01:39:07,780 at the easterly half of the parcel. 1073 01:39:08,520 --> 01:39:14,600 A jurisdictional wetland is present at the base of the slope near the easterly perimeter of 1074 01:39:14,600 --> 01:39:19,900 the site. The subject property lies within the residential R3 single-family 1075 01:39:19,900 --> 01:39:24,640 residences are permitted as a primary use in the subject zone. 1076 01:39:26,840 --> 01:39:27,820 The project 1077 01:39:27,820 --> 01:39:32,720 requires a design review permit for encroachment into natural steep slopes and 1078 01:39:33,140 --> 01:39:37,260 landscaping and site improvements. It also requires a coastal development permit 1079 01:39:37,260 --> 01:39:40,280 to review the project for compliance with the local coastal program. 1080 01:39:42,740 --> 01:39:43,140 The project 1081 01:39:43,140 --> 01:39:48,800 site is within the scenic visual corridor overlay zone, given their proximity to the interstate 1082 01:39:48,800 --> 01:39:57,700 five. Section 3034-08-0 of the municipal code provides that for projects within the scenic visual 1083 01:39:57,700 --> 01:39:59,860 overlay corridor zone. Consider 1084 01:40:00,000 --> 01:40:29,920 Administration shall be given to the overall public visual impact of the project. It also allows certain conditions or limitations pertaining thereto to be applied to the project. The project proposes a single story residents and a single story accessory dwelling in. The project will feature a modern architectural style. The bulk and mass of the home is relatively low profile and design in that it is a single story and is situated on the 1085 01:40:29,920 --> 01:40:35,520 western most portion of the parcel. More than 312 feet away from the interstate 1086 01:40:35,520 --> 01:40:41,460 fly freeway. Several existing adjacent residences are two story and feature a 1087 01:40:41,460 --> 01:40:47,840 variety of architectural styles such as farmhouse, traditional and craftsman. The 1088 01:40:47,840 --> 01:40:52,240 new residents will not have more of a visual impact than existing adjacent 1089 01:40:52,240 --> 01:40:56,280 residences. The grading of the property will be limited to the western most 1090 01:40:56,280 --> 01:41:02,700 portion of the site. Reducing the visual impact on the existing slopes and preserving the steep 1091 01:41:02,700 --> 01:41:08,800 slopes in an open space easement, the slopes are located adjacent to Interstate 5, preserving them 1092 01:41:08,800 --> 01:41:15,370 would preserve the view within this portion of the visual corridor. The project features 1093 01:41:15,370 --> 01:41:23,930 stone veneer, smooth finished echo, wood siding, metal fascia, and black window trim and mullions. 1094 01:41:23,930 --> 01:41:29,360 The structures will be located on the western side of the parcel. 1095 01:41:29,680 --> 01:41:34,520 The easterly side of the parcel contains a jurisdictional wetland that will be protected 1096 01:41:34,520 --> 01:41:39,980 in perpetuity with a recorded open space easement that includes an additional area that 1097 01:41:39,980 --> 01:41:45,440 provides a 50-foot buffer as measured from the outermost limits of the wetland habitat. 1098 01:41:46,000 --> 01:41:50,700 The property contains steep slopes that are 25% or greater gradient. 1099 01:41:50,700 --> 01:41:57,020 All Steve slopes that are not developed within this project will be placed within a Steve 1100 01:41:57,020 --> 01:42:00,500 slopes easement that will preserve the slopes and perpetuity. 1101 01:42:01,060 --> 01:42:04,240 And I'm going to take a quick pause here just to point out what we're looking at here on 1102 01:42:04,240 --> 01:42:04,700 the screen. 1103 01:42:05,880 --> 01:42:11,420 The existing wetland area is outlined in green and I apologize it's probably really hard 1104 01:42:11,420 --> 01:42:17,580 to see from here what that looks like, but it's here on the usually side of the site. 1105 01:42:17,840 --> 01:42:18,240 Thank you. 1106 01:42:18,240 --> 01:42:24,740 And then the 50-foot buffer is going to be from the outermost limits of that wetland. 1107 01:42:25,860 --> 01:42:33,760 And then the reason why this red outline is even larger than what the buffer is, is 1108 01:42:33,760 --> 01:42:37,620 this red outline is also including the steep slopes that are on the property. 1109 01:42:38,240 --> 01:42:43,580 So any steep slopes that were not part of the development got placed in this easement. 1110 01:42:43,580 --> 01:42:53,740 So, to clarify this easement will be recorded against the property, the easement will include 1111 01:42:53,740 --> 01:43:00,220 an exhibit that looks a lot like this shape on this parcel and will include a legal description 1112 01:43:00,220 --> 01:43:06,840 as well that will describe the meets and bounds of this particular area in red. So just wanted 1113 01:43:06,840 --> 01:43:12,580 to take a moment to explain that. The yellow that you see here on the exhibit are the radial lines 1114 01:43:12,580 --> 01:43:16,580 for fire access for hose pool in particular. 1115 01:43:17,140 --> 01:43:20,400 I just wanted to explain that it is here on this image. 1116 01:43:23,860 --> 01:43:26,360 Okay, the residence includes four bedrooms, 1117 01:43:27,020 --> 01:43:30,280 four bathrooms, a laundry room, a living room, 1118 01:43:30,740 --> 01:43:35,840 kitchen, pantry, dining room, office, lounge, 1119 01:43:36,320 --> 01:43:37,560 and an attached garage. 1120 01:43:38,700 --> 01:43:41,860 The subject property is zoned R3, 1121 01:43:41,860 --> 01:43:47,720 which allows for a maximum building height of two stories and 22 feet measured 1122 01:43:47,720 --> 01:43:52,260 to the top of the roof above the exterior building wall and 26 feet measured 1123 01:43:52,260 --> 01:43:58,800 to the peak of a pitched roof with a minimum 312 pitch. The project also has an 1124 01:43:58,800 --> 01:44:05,760 average lot soap that is greater than 10% with a 15.5% average lot slope as 1125 01:44:05,760 --> 01:44:10,480 documented in the plans and therefore a subject to an additional height restriction 1126 01:44:10,480 --> 01:44:13,880 in limiting flat roof structures to 12 feet tall 1127 01:44:14,260 --> 01:44:17,240 as measured from the highest uphill property line. 1128 01:44:17,780 --> 01:44:19,880 In this case, the southern property line 1129 01:44:19,880 --> 01:44:21,480 is the highest property line. 1130 01:44:22,380 --> 01:44:23,940 The height of the proposed structures 1131 01:44:23,940 --> 01:44:27,800 is measured from the lower of the existing or proposed grade. 1132 01:44:28,440 --> 01:44:32,020 The project proposes a one-story residential residence 1133 01:44:32,300 --> 01:44:36,640 with a maximum height of 21 feet and seven and a quarter inches 1134 01:44:36,640 --> 01:44:42,380 to the top of the roof material as measured from the east elevation of the primary residence 1135 01:44:42,380 --> 01:44:47,300 and that's highlighted in yellow here on the slide. I know the number is really tiny, but that's 1136 01:44:47,300 --> 01:44:54,040 what it says. Although the roof elements of the 312 pitch are not considered pitch roof elements 1137 01:44:54,040 --> 01:44:59,660 and are instead considered a shed roof subject to the flat roof height requirements. 1138 01:45:00,400 --> 01:45:29,900 Each portion of the residents and the accessory dwelling unit is below the additional 12-foot height limit as measured from the tallest property line. This project complies with the applicable height restrictions and will be required to provide a height certification from a licensed land surveyor during construction to demonstrate compliance with the plans and height limitations. These are some additional elevations of the home with the rear and the 1139 01:45:30,600 --> 01:45:34,380 left elevation there. That will be facing the street. 1140 01:45:37,750 --> 01:45:41,150 And these are the ADU elevations. Again, it's a single story. 1141 01:45:41,550 --> 01:45:45,050 It does go below that 12 foot property line. 1142 01:45:45,650 --> 01:45:48,330 So what's interesting here, and I guess I should pause a little bit 1143 01:45:48,330 --> 01:45:51,470 and explain what that 12 foot height line means 1144 01:45:51,470 --> 01:45:52,730 because I think it might be helpful. 1145 01:45:53,450 --> 01:45:55,930 If we were to go back over here on this site plan, 1146 01:45:56,090 --> 01:45:58,070 that's the other property line that we're talking about 1147 01:45:58,070 --> 01:45:59,870 is this one here. 1148 01:45:59,870 --> 01:46:05,550 There's a bunch of little dots and elevation measurements because we have taken those and 1149 01:46:05,550 --> 01:46:11,130 matched them to the corners of the building to measure that 12 foot above property line. 1150 01:46:11,930 --> 01:46:19,070 And so if we were to go here on these elevations, these elevations then have the property line 1151 01:46:19,070 --> 01:46:23,730 measurement and what that is and it would match and then 12 feet above that. 1152 01:46:23,790 --> 01:46:27,230 So that's where these dotted lines are, they're the 12 and the 16. 1153 01:46:27,230 --> 01:46:32,970 In this case, because the project has flat roof elements and not pitched, we were looking 1154 01:46:32,970 --> 01:46:34,250 at the 12-foot line. 1155 01:46:35,750 --> 01:46:39,770 So with all of that, the project is complying essentially. 1156 01:46:40,250 --> 01:46:43,770 But I wanted to explain that a little bit because especially when we come here to the accessory 1157 01:46:43,770 --> 01:46:48,790 dwelling units, and you see where the property line is drawn versus where the 12-foot height 1158 01:46:48,790 --> 01:46:50,610 line is very clearly under that. 1159 01:46:51,190 --> 01:46:55,010 And so this project is very much complying with the requirements that they need. 1160 01:46:55,870 --> 01:47:04,030 So moving on, the citizen participation program was held on June 2nd, 2026, for attendees 1161 01:47:04,030 --> 01:47:05,950 from the public came to the meeting. 1162 01:47:06,470 --> 01:47:11,570 They were in general support of the project, and there were general questions that were 1163 01:47:11,570 --> 01:47:14,050 received, mostly just curiosity about the project. 1164 01:47:14,910 --> 01:47:20,710 And a public hearing notice was mailed on August 20th, 2026, and no comments were received. 1165 01:47:21,570 --> 01:47:27,570 The project has been determined to be exempt from environmental review pursuant to California 1166 01:47:27,570 --> 01:47:33,970 Environmental Quality Act guidelines, 15303A, which exempts the construction of small structures, 1167 01:47:34,310 --> 01:47:38,170 including a single family residence and an accessory dwelling in it. 1168 01:47:38,650 --> 01:47:44,170 The proposed project, with conditions incorporated, is consistent with the objectives and policies 1169 01:47:44,170 --> 01:47:49,510 of the general plan and local cost of plan and demonstrates compliance with applicable sections 1170 01:47:49,510 --> 01:47:54,090 of the Incinitas Municipal Code and objective design standards in the city of 1171 01:47:54,090 --> 01:47:59,090 Incinitas, design standards, and guidelines document. The findings can be made 1172 01:47:59,090 --> 01:48:04,150 to support the project staff recommends approval of the design review permit and 1173 01:48:04,150 --> 01:48:09,190 the coastal development permit. Myself and the applicant are here at the meeting 1174 01:48:09,190 --> 01:48:12,570 and available to answer any questions you may have. Thank you for your time. 1175 01:48:14,090 --> 01:48:18,830 Thank you, Christina. Any commissioner questions for the staff? 1176 01:48:18,830 --> 01:48:33,210 I had one, please. Thank you for the presentation. If you could go back to the slide where you were showing the outline of the easement, I had a question regarding that. 1177 01:48:38,150 --> 01:48:41,290 Okay. Is this the image you're looking for? Yes. 1178 01:48:44,070 --> 01:48:51,890 Right above the lower left part of the easement, it looks like there's a little somewhat triangular 1179 01:48:51,890 --> 01:48:55,430 piece of land that's excluded from the easement. 1180 01:48:55,430 --> 01:49:02,710 It has two little boxes in it, but it looks like it's kind of stranded because there's a 1181 01:49:02,710 --> 01:49:07,690 property line, so there's additional property adjacent property next to it. 1182 01:49:07,690 --> 01:49:16,150 I'm curious why that is not part of the easement or and it doesn't have any intended use. 1183 01:49:16,790 --> 01:49:24,170 Yeah, so for that, yes and yes, let me go to a different image really quickly and get my help. 1184 01:49:29,600 --> 01:49:31,700 Let's see, let's wait for it. Okay, there we are. 1185 01:49:31,700 --> 01:49:46,620 So this is the sleep slope analysis in the why we're seeing slopes that are less than 25% grade, the yellow are 25% to 40% grade, and then the red is over 40% grade. 1186 01:49:47,280 --> 01:49:59,760 So where is our red outline on this particular project or this particular sheet? This time it's not a red outline, it's rather just kind of a dotted outline that if you can kind of imagine. 1187 01:50:00,000 --> 01:50:29,840 What it was in the previous slide. There is a little pocket here where there are no steep slopes. The applicant has decided to take advantage of that and add for themselves a small footpath to these little sheds here that they use for whatever reasons they use it for. And so they are allowed to do that. The reason why they would want to do that now, and maybe not leave that off the plan 1188 01:50:29,840 --> 01:50:39,780 is because it would make more sense to create a boundary for this easement that is as simple 1189 01:50:39,780 --> 01:50:45,720 to explain as possible and doing a little pocket like this isn't really that advantageous 1190 01:50:45,720 --> 01:50:52,320 to us. However, it is to the property owner. And because it's not steep slopes, we say, hey, 1191 01:50:52,460 --> 01:50:57,960 why don't we go ahead and utilize that for our future use for whatever reason they would 1192 01:50:57,960 --> 01:51:04,040 like to, as long as it's when the thing code. So that's why does that help? 1193 01:51:04,320 --> 01:51:14,060 It does. Thank you. So then for them to access that flat part of the slope, they will 1194 01:51:14,060 --> 01:51:24,640 access it that through the the easement that the so they it's very hard to tell here, but it's 1195 01:51:24,640 --> 01:51:32,760 Why it enough for a footpath so just a tiny little area here where you can kind of walk between the property line and the easement line 1196 01:51:32,760 --> 01:51:36,320 I know it's hard to look at in this particular document, but 1197 01:51:37,200 --> 01:51:43,520 Let's see if we go back. I understand what you're saying. Yeah, I can tell that from the drawing. It just looked like a stranded piece of 1198 01:51:44,260 --> 01:51:50,180 Landon I it struck me as odd that it was there. So I understand that. Oh, thank you 1199 01:51:51,660 --> 01:51:59,480 While that image is up on the screen, or it was, can you explain the area that's crosshatched? 1200 01:51:59,580 --> 01:52:04,960 It looks like there's yellow slope area that is crosshatched. 1201 01:52:05,870 --> 01:52:09,200 So that is steep slope that is part of the development. 1202 01:52:09,740 --> 01:52:11,840 Yes, so it's an excellent question. 1203 01:52:12,280 --> 01:52:14,920 These are steep slopes that were on the property. 1204 01:52:14,920 --> 01:52:22,000 These are the steep slopes that they are indicating was part of the encroachment that they calculated. 1205 01:52:22,700 --> 01:52:26,800 And so in order for us to understand, okay, where was that spatially? 1206 01:52:27,080 --> 01:52:29,440 They've put this cross hatch pattern on for us. 1207 01:52:30,000 --> 01:52:35,920 What's important to know because I'm seeing on the screen there are some yellow spots that are like in the driveway sections. 1208 01:52:36,580 --> 01:52:42,740 We do have within our code that encroachment into steep slopes for purposes of accessing the property 1209 01:52:42,740 --> 01:52:49,480 or for coming into, say, your garage or something like that, it doesn't count towards the encroachment. 1210 01:52:50,020 --> 01:52:53,640 And so, even though we may see some small portions that are within the driveway, 1211 01:52:53,640 --> 01:52:55,440 they did not count towards encroachment. 1212 01:52:56,440 --> 01:52:58,960 What is the allowed encroachment? 1213 01:52:59,320 --> 01:52:59,900 10%. 1214 01:52:59,900 --> 01:53:00,700 10%. 1215 01:53:00,700 --> 01:53:02,840 And are they at 9.9? 1216 01:53:03,180 --> 01:53:03,300 Yes. 1217 01:53:05,560 --> 01:53:09,240 Is it common to put the remaining slope into an easement? 1218 01:53:09,240 --> 01:53:17,100 Yeah, so our code requires any steep slopes that were not disturbed as part of the property development 1219 01:53:17,100 --> 01:53:24,160 be preserved into an open space easement, and so that's why we're doing what we're doing. 1220 01:53:24,580 --> 01:53:25,100 Thank you. 1221 01:53:26,940 --> 01:53:28,340 Any, go ahead. 1222 01:53:28,600 --> 01:53:34,460 I'd like to ask about the connection to the sewer, which runs along the east portion of the property 1223 01:53:34,460 --> 01:53:36,620 and how that will be developed. 1224 01:53:41,360 --> 01:53:42,640 So that's a good question. 1225 01:53:43,280 --> 01:53:48,880 There is a sewer easement that runs along the cow trans right away, which is on the easterly part of the property. 1226 01:53:49,380 --> 01:53:52,680 It's kind of between the property and the freeway, if you will. 1227 01:53:53,220 --> 01:53:58,280 They are not connecting to sewer from there. I think that's a good thing to clarify. 1228 01:53:59,200 --> 01:54:08,060 This particular image that we have on the screen now is essentially showing that the property is going to take sewer connection from the ocean view avenue. 1229 01:54:08,060 --> 01:54:11,760 so I can zoom in just a little bit because it looks like it's hard to see out 1230 01:54:11,760 --> 01:54:17,380 there. This blue line is the sewer line and so that's where they're going to take 1231 01:54:17,380 --> 01:54:23,000 it from. Does that require a sump pump? I will leave that to the applicant. I don't 1232 01:54:23,000 --> 01:54:24,560 recall off the top of my head. 1233 01:54:33,500 --> 01:54:37,940 Let's can keep that one up. My question is up at the 1234 01:54:37,940 --> 01:54:45,580 northern property line. The distance between the property line and the corner of 1235 01:54:45,580 --> 01:54:59,620 the ADU. Looks like it's according to your it's four feet. That's pretty tight. I think 1236 01:54:59,620 --> 01:54:59,960 I'm sorry, I'm sorry. 1237 01:55:00,000 --> 01:55:29,720 So identified on page 6 of the plan of the municipal code analysis, and it's compliant. No one commented on that, and is that the code just 4 feet from a property line on a site as large as this? So it is a good thing to clarify. This particular zone is required to have a 10 foot side yard setback and that portion that you're looking at here on the north, that is a side yard. The 4 feet comes 1238 01:55:29,720 --> 01:55:35,780 from the state code and the allowances for accessory dwelling units so the 1239 01:55:35,780 --> 01:55:41,220 only reason why this is as close as it is the four feet is because the state 1240 01:55:41,220 --> 01:55:47,180 codes allow for it. Okay and no we did not get any public comments on the 1241 01:55:47,180 --> 01:55:51,740 proximity of that ADU to the property line. All right 1242 01:55:55,360 --> 01:55:59,760 and it's the ADU size is when 1243 01:55:59,760 --> 01:56:02,720 we don't see a lot of ADUs come across so usually those are done 1244 01:56:02,720 --> 01:56:04,440 administratively or ministerially. 1245 01:56:05,840 --> 01:56:12,080 So this is the last ADU that came before us a few minutes ago was 456 square feet and 1246 01:56:12,080 --> 01:56:14,740 I think the other one was approximately the same size. 1247 01:56:15,480 --> 01:56:18,000 This is a 1100 square foot ADU. 1248 01:56:19,080 --> 01:56:24,020 What do our codes say about the size of an ADU or is it a state mandate or could you just 1249 01:56:24,020 --> 01:56:30,660 give me some clarification on our codes versus city codes or state codes to allow an ADU to put 1250 01:56:30,660 --> 01:56:32,920 something four feet from our property line? 1251 01:56:33,300 --> 01:56:37,800 Yeah, so an accessory dwelling unit at maximum could have been 1,200 square feet. 1252 01:56:38,000 --> 01:56:42,180 So they actually could have done even larger than they did by 100 square feet. 1253 01:56:42,480 --> 01:56:47,820 And so yes, that is something that's also regulated by the state as well as our code. 1254 01:56:48,280 --> 01:56:50,720 And so that's the size that it could have been. 1255 01:56:50,880 --> 01:56:51,920 It's not that much. 1256 01:56:52,080 --> 01:56:57,540 And so yes, it's following the codes that are applicable. 1257 01:56:57,540 --> 01:57:10,120 Okay, and is there a fence that runs along the northern property line as submitted as it means to it can be as high as six feet. Yes, that's correct. Okay. Thank you. 1258 01:57:10,740 --> 01:57:14,800 Let's see if I had another one that was code setbacks 1259 01:57:18,380 --> 01:57:27,340 on the inland the hillside inland bluff overlay zone on page eight of 103 of the report. 1260 01:57:27,340 --> 01:57:50,120 I think you mentioned this, it says the site is composed of 65.7% parcel are area with less than 25% slope capacity, 27.6% of the parcel area with 25% of 40% slope capacity and 6.7% of the area with over 40% slope capacity. 1261 01:57:50,940 --> 01:57:56,940 The total area of the property within the steep slopes that are 25% or greater is 34%. 1262 01:57:56,940 --> 01:57:59,000 So it's a lot there for me. 1263 01:58:00,760 --> 01:58:07,100 How does that get incorporated into our approval process? 1264 01:58:07,980 --> 01:58:13,240 You mentioned maybe pull up the hash, the one that Commissioner with the yellow and the red 1265 01:58:13,240 --> 01:58:13,680 on it. 1266 01:58:17,510 --> 01:58:20,830 And I guess does that all just kind of then go into the stew pot. 1267 01:58:20,830 --> 01:58:27,630 And as long as they're under 10% or there's two different things you're at 9.9% but it seems like 1268 01:58:28,510 --> 01:58:38,310 This is a very steep site site and is there anything of your concern in the hillside in limb left over a zone that we're too steep to build 1269 01:58:41,040 --> 01:58:47,820 So this particular property you are correct a majority of the site or at least a large portion of the site is within steep slopes 1270 01:58:47,820 --> 01:58:51,820 maybe more than some of the other properties that we look at on a regular basis and 1271 01:58:53,040 --> 01:59:01,220 to answer your question, the 34.3% isn't exactly a key factor. 1272 01:59:02,040 --> 01:59:10,980 What is a key factor is, and it gets kind of confusing here the way that we articulate the numbers. 1273 01:59:11,540 --> 01:59:22,440 But if there is more than 10% of the whole lot that are steep slopes or 25% are more gradient, 1274 01:59:22,440 --> 01:59:25,300 then they get an additional height restriction. 1275 01:59:25,940 --> 01:59:26,180 Okay. 1276 01:59:26,480 --> 01:59:27,740 So that's one criteria. 1277 01:59:28,140 --> 01:59:28,360 All right. 1278 01:59:28,940 --> 01:59:32,080 Another criteria that comes into play is, okay, 1279 01:59:32,480 --> 01:59:37,160 all of this area, the 34.3% portion, 1280 01:59:37,620 --> 01:59:40,660 the percent so much isn't as much of an interest 1281 01:59:40,660 --> 01:59:44,580 for this particular thing I'm about to explain, 1282 01:59:44,840 --> 01:59:49,040 but it isn't that there's a lot here that's steep. 1283 01:59:49,040 --> 01:59:59,960 and so of these steep slopes only 10% is allowable to be encroached within. So mapping all of the 1284 02:00:00,000 --> 02:00:29,480 Soap's on to a parcel like this is helpful because it allows us to visually see where is that, especially, and where is the encroachment that the applicant is asking for in order to accommodate their development. And so the two different things, the criteria one is the height, the next one is the encroachment, the 34.3% is a little bit arbitrary in here because it's not directly linking towards anything. It's more of just information. 1285 02:00:29,480 --> 02:00:32,980 It's a statement, it's just identifying facts of the property. 1286 02:00:33,640 --> 02:00:37,600 But those are the two things, why we would be interested in some of this information. 1287 02:00:37,860 --> 02:00:43,720 And for Commissioner Dalton, the next paragraph, beginning with the proposed encroachment into steep slope. 1288 02:00:44,580 --> 02:00:49,300 Is that the hatched area that we're talking about that, is that being the 9.9%? 1289 02:00:49,640 --> 02:00:50,300 That is correct. 1290 02:00:50,600 --> 02:00:57,380 And is that 9.9% over the gross acreage, or the buildable area because if it's the buildable area, 1291 02:00:57,380 --> 02:00:59,880 Yeah, it looks like it's more than 9.9%. 1292 02:00:59,880 --> 02:01:08,200 So, is it 9.9% of the state's lower area or the yellow areas? 1293 02:01:08,600 --> 02:01:17,320 Yeah, so anything that's red or yellow of those square foot areas, 10% of that, so it's 1294 02:01:17,320 --> 02:01:18,100 not the whole lot. 1295 02:01:18,280 --> 02:01:21,060 It's just the colored areas in this case and this exhibit. 1296 02:01:21,680 --> 02:01:22,380 That was very helpful. 1297 02:01:22,520 --> 02:01:22,800 Thank you. 1298 02:01:25,160 --> 02:01:34,720 I think I just discovered a new term that I didn't know before but can you explain to me what the stirred rutter roll is? 1299 02:01:37,180 --> 02:01:44,780 You know, I don't know that I know that term very well either and I feel like I would be giving you a guess if I give you an answer. 1300 02:01:45,640 --> 02:01:53,020 I'm going to default here and ask for a line. Do you happen to know Denise? No? Does anybody on the dius now? 1301 02:01:53,020 --> 02:02:00,960 Oh hey, if you don't mind Mr. Books, if you could speak in the microphone otherwise we don't get it on the record. 1302 02:02:01,800 --> 02:02:02,680 Thank you. 1303 02:02:05,060 --> 02:02:06,800 Not going to say this is 100%. 1304 02:02:06,800 --> 02:02:08,480 But this used to be an avocado orchard. 1305 02:02:09,020 --> 02:02:11,160 And so basically this land has all been disturbed. 1306 02:02:11,560 --> 02:02:14,080 It's not native wild wild land. 1307 02:02:14,180 --> 02:02:20,820 So there's still existing avocado trees from the avocado orchard down closer to the wetlands. 1308 02:02:21,260 --> 02:02:24,800 That the roots reach down to the water table and they're able to survive naturally. 1309 02:02:24,800 --> 02:02:27,120 But all this land has been farmed. 1310 02:02:27,360 --> 02:02:30,000 It is all irrigated from the officolor orchard. 1311 02:02:30,560 --> 02:02:37,000 The actual pre-these owners of the officolor orchard once still lives on the southeast corner 1312 02:02:37,000 --> 02:02:44,900 and her daughter lives on the northwest corner, you know, and so there's still the family 1313 02:02:44,900 --> 02:02:47,800 and then the brother owns the house behind the mother. 1314 02:02:48,340 --> 02:02:54,480 So they had a five acre parcel, partial and ports off, sold off some acres and this was 1315 02:02:54,480 --> 02:03:01,260 remained off. I got a orchard till 1950s or 60s. And then they turned off the irrigation and 1316 02:03:01,860 --> 02:03:07,260 most of the trees died. But so it's not native undisturbed land. So that's what the 1317 02:03:07,260 --> 02:03:10,440 disturb. So it's when you plant over it's native. 1318 02:03:13,080 --> 02:03:15,400 It's all the native plants are gone. They've 1319 02:03:15,400 --> 02:03:24,720 till they've planted, they've irrigated, so it's nothing native is left when the drainage 1320 02:03:24,720 --> 02:03:29,660 from the highway went through the base, which used to be, you know, the daughter used to ride 1321 02:03:29,660 --> 02:03:36,040 her horses on here, but when the highway five was built and expanded, that became a drainage 1322 02:03:36,040 --> 02:03:42,980 ditch, which that drainage ditch then brought wildlife from the occasional rain, you know, from the 1323 02:03:42,980 --> 02:03:52,540 highway runoff that goes through that wetland but that's just one more related to that there's 1324 02:03:52,540 --> 02:04:00,520 some existing old irrigation is that just going to leave that I mean it's going to have to be torn 1325 02:04:00,520 --> 02:04:07,960 out in order to it to I mean so we're basically need to excavate even for the driveway so all that's 1326 02:04:07,960 --> 02:04:13,680 going to be torn out. They're still in the steep slopes. There's still irrigation in there. 1327 02:04:14,140 --> 02:04:20,220 I don't believe I'm allowed to tear that out. So wherever there's building, it'll be torn out. 1328 02:04:20,820 --> 02:04:26,420 Wherever it remains, it needs to remain just because I don't think I'm allowed to touch it. 1329 02:04:26,540 --> 02:04:28,840 Okay. Thank you for the explanation. Sure. No problem. 1330 02:04:32,500 --> 02:04:37,220 Two quick questions. Well, quick questions. One in the biology report, they noted 1331 02:04:38,240 --> 02:04:43,400 an endangered species that the Vero, the least Vero turn, I think, or the least Vero. 1332 02:04:44,140 --> 02:04:51,240 That's was found down in the scrub area, and that's not going to be disturbed, is that 1333 02:04:51,240 --> 02:04:51,400 right? 1334 02:04:52,140 --> 02:04:52,740 You are correct. 1335 02:04:53,160 --> 02:04:53,660 Okay, great. 1336 02:04:54,000 --> 02:04:54,660 Thank you for that. 1337 02:04:55,480 --> 02:04:59,980 And then, since you just, just propped into my head, drainage was- 1338 02:05:00,000 --> 02:05:29,560 Another project, it's a pretty steep slope. There's going to be natural rain this year that's going to come down the slope. Does the applicant, does the, do the drawings require any sort of, I mean, we have stormed in requirements, so everything that's buildable kind of has to be part of the stormwater management program, but is the applicant required to do any grading or any adjustments to the slopes to make sure that they're stable? Or is that just going to remain natural? 1339 02:05:29,560 --> 02:05:33,180 And it's natural. It just is what it is. 1340 02:05:35,990 --> 02:05:55,670 It's going to remain the way that it is. And that's part of the open space easement is that it will just remain that way in perpetuity. And the idea being that over time, the natural landscape will begin to recover and come back. I think that probably take a while, but that is the idea. 1341 02:05:55,670 --> 02:06:00,630 Okay. Thank you. Okay. Thank you very much, Christina. 1342 02:06:02,730 --> 02:06:05,370 The applicant is here. Would you like to address the commission? 1343 02:06:12,620 --> 02:06:19,840 Hi, my name is John Brooks and this is my civil engineer, Joel Weymire. Appreciate everyone's time tonight. I know it's getting late. 1344 02:06:20,540 --> 02:06:26,360 Just wanted to explain the background of the project just so I know it sounds like there's a lot of developers that come in here. 1345 02:06:26,360 --> 02:06:28,080 I have two small children. 1346 02:06:28,260 --> 02:06:30,620 I'm looking to build a house for me, my family. 1347 02:06:31,100 --> 02:06:34,300 I have one remaining parent, my wife has one remaining parent. 1348 02:06:34,620 --> 02:06:37,060 We're still planning to do a multi-generational house. 1349 02:06:37,660 --> 02:06:41,620 There are ADA requirements for our living situation, 1350 02:06:41,620 --> 02:06:44,780 which is why we've been looking for a place to build a single story house. 1351 02:06:46,900 --> 02:06:51,360 The size of this lot, as well as the restrictions on high restrictions, 1352 02:06:51,880 --> 02:06:54,860 and to merge together where this tends to be a good place. 1353 02:06:56,340 --> 02:07:01,520 We, because of the highway noise, we tried to build as far west as possible to minimize 1354 02:07:01,520 --> 02:07:05,140 that as you go down the slope, noise increases the closer you get to the highway. 1355 02:07:06,120 --> 02:07:08,320 Staying away from the wetlands has also been important. 1356 02:07:09,100 --> 02:07:14,940 In terms of the, you know, grading and how far down, that's the sewer, the question about 1357 02:07:14,940 --> 02:07:18,880 the sewer drainage to ocean you having was one of the important things. 1358 02:07:19,940 --> 02:07:26,320 In that, in terms of where we're grading to in order to be able to still naturally slope 1359 02:07:26,320 --> 02:07:29,860 and Joel knows all the technicalities, but that was one of the requirements. 1360 02:07:32,620 --> 02:07:37,420 I think that's all I have, I don't know, do you have anything to add Joel or available for questions? 1361 02:07:37,640 --> 02:07:39,000 Available for questions if you have any. 1362 02:07:39,300 --> 02:07:42,040 Okay, thank you for coming tonight and thank you for that explanation. 1363 02:07:43,620 --> 02:07:45,260 Are there any public comments on this? 1364 02:07:46,080 --> 02:07:46,340 Thank you. 1365 02:07:46,340 --> 02:07:52,160 All right, I'm going to close the public comment portion, open up to Commissioner deliberation. 1366 02:07:54,250 --> 02:07:55,390 Anyone want to start? 1367 02:07:59,100 --> 02:07:59,540 Start. 1368 02:08:00,020 --> 02:08:00,220 Okay. 1369 02:08:00,740 --> 02:08:01,040 Happy to. 1370 02:08:01,340 --> 02:08:03,740 Yeah, I found that property would be very interesting. 1371 02:08:04,040 --> 02:08:08,700 It's got a variety of aspects to it, the interesting architecture. 1372 02:08:09,740 --> 02:08:13,760 We don't see very many single stories spread out so wide. 1373 02:08:14,280 --> 02:08:19,480 And in a position where it was presented, I found that very interesting. 1374 02:08:19,480 --> 02:08:26,920 and including the dedicated natural habitat space with wetland in it, that also has a major 1375 02:08:26,920 --> 02:08:31,340 sewer line running right outside of it and left by freeway. So, all very interesting. 1376 02:08:31,940 --> 02:08:44,380 And I didn't find anything specifically outstanding as far as concerns, and so I was fairly supportive 1377 02:08:44,380 --> 02:08:47,660 of the design and the support of the project moving forward. 1378 02:08:49,480 --> 02:08:49,920 Okay. 1379 02:08:52,180 --> 02:08:58,480 Yeah, I, you know, the context of the ADU and the single story, 1380 02:08:58,480 --> 02:09:01,640 we rarely get that because of the densities and people tend to go vertical. 1381 02:09:02,300 --> 02:09:06,480 So it makes a lot of sense now a little bit more because we haven't seen too many of those. 1382 02:09:06,700 --> 02:09:08,840 So I agree with Commissioner Whitaker. 1383 02:09:08,980 --> 02:09:10,620 I think it's a good project for the site. 1384 02:09:10,760 --> 02:09:15,760 You've tried to accomplish as much as you can as far away from the freeway as possible. 1385 02:09:16,240 --> 02:09:20,100 for both personal and for, you know, just in the slope issue also. 1386 02:09:20,380 --> 02:09:24,900 And, you know, you came in, you squeaky, you squeaked right under the 10% rule. 1387 02:09:25,280 --> 02:09:30,020 I'm sure that took a lot of deliberation by your consultants and well done. 1388 02:09:30,360 --> 02:09:33,780 It seems to meet everything and this is a complicated deal. 1389 02:09:34,640 --> 02:09:38,820 And so I appreciate staff's clarification on a lot of these items. 1390 02:09:39,000 --> 02:09:41,700 We don't see them all the time, so thank you for your time tonight. 1391 02:09:41,940 --> 02:09:42,860 Thanks, staff. That was a good one. 1392 02:09:44,220 --> 02:09:45,640 I would support the project. 1393 02:09:48,890 --> 02:09:50,530 I also support the project. 1394 02:09:51,010 --> 02:09:55,310 I think it, on first blush, it looks like a tough site to build on, because it is so 1395 02:09:55,310 --> 02:09:55,630 steep. 1396 02:09:56,270 --> 02:09:59,850 and to see that you're able to fit large singles 1397 02:10:04,840 --> 02:10:13,560 I appreciate the, you know, conformance to the regulations and it will be nice to have that large slope preserved. 1398 02:10:17,200 --> 02:10:29,980 Some of those avocado trees at the bottom will survive, but that's not, you know, that I think that era is over for that property. But it will provide a nice kind of a migratory path for other animals that are in the area. So, I think that's a good thing. 1399 02:10:29,980 --> 02:10:40,420 I'm happy to see so much of it staying as it is and eventually rewilding so overall I think it's a good project for the area. 1400 02:10:47,260 --> 02:10:57,200 You're pointing out that there's a correspondence submitted to us on this property or project for some organization about housing. 1401 02:10:57,540 --> 02:11:00,760 I was confused why that applied to a single family home. 1402 02:11:02,580 --> 02:11:08,140 but I don't want to distract. I also support the project. I don't find that 1403 02:11:08,140 --> 02:11:12,820 that letter has with anything it's asking us to support the project and I 1404 02:11:12,820 --> 02:11:20,400 already support it for other reasons and so let me just say I concur with your 1405 02:11:20,400 --> 02:11:25,120 comments and I hope you get a nice house for your family out of it but we're not 1406 02:11:25,120 --> 02:11:30,840 quite, quite there. Any other final comments or I would suggest a motion? 1407 02:11:33,700 --> 02:11:37,460 I'll move approval. Seconded. Thank you. Let's call the vote. 1408 02:11:47,100 --> 02:11:50,580 Okay. Thank you for staying late tonight and you're approved 5-0. 1409 02:11:51,160 --> 02:11:52,460 I look forward to seeing your house bill. 1410 02:12:01,710 --> 02:12:01,790 Okay. 1411 02:12:04,030 --> 02:12:08,870 Item 9 tonight is future agenda items added by the Planning Commissioners. 1412 02:12:09,030 --> 02:12:12,490 Are there any future agenda items? Mr. Whitaker. 1413 02:12:14,610 --> 02:12:17,730 Chair Dalton, I was wondering if perhaps we could get in. 1414 02:12:18,250 --> 02:12:23,370 I don't have a future agenda item to propose to be added to the agenda at this time, but 1415 02:12:23,370 --> 02:12:27,990 I was wondering if perhaps we could just get updated about the work plan, perhaps some 1416 02:12:27,990 --> 02:12:33,370 of the progress with things on the work plan as well as the work plan itself being presented. 1417 02:12:33,370 --> 02:12:43,110 I know that we're having a switch over with Andrew now stepping in for Secretary and I 1418 02:12:43,110 --> 02:12:47,510 thought maybe some discussion about process and moving forward would be helpful. 1419 02:12:47,890 --> 02:12:48,030 Sure. 1420 02:12:48,310 --> 02:12:56,350 Let me, I'll let this bleed into commission reports of some sort, but we're scheduled to go, 1421 02:12:56,610 --> 02:13:01,650 I'm scheduled to go to the City Council September 23rd, I believe you said. 1422 02:13:02,170 --> 02:13:02,550 That's correct. 1423 02:13:02,550 --> 02:13:13,170 Okay, September 23rd, you know, this commission approved the work plan at the two meetings 1424 02:13:13,170 --> 02:13:19,310 ago. I think it was two of you were missing. I think there was a quorum of three. We 1425 02:13:19,310 --> 02:13:26,170 voted approved it as it was written amended by Megan. And so that's in the works to go to 1426 02:13:26,170 --> 02:13:26,950 the city council. 1427 02:13:31,030 --> 02:13:37,490 And could I get is there any update with the inclusionary housing since 1428 02:13:37,490 --> 02:13:45,090 we've approved it any any movement with that. So the resolution and the attachment which 1429 02:13:45,090 --> 02:13:50,750 is exhibit A has been circulated for a signature. So before I circulated it I ensure that I 1430 02:13:50,750 --> 02:13:56,570 included those additional links related to the local agencies. And so once we finalize signatures 1431 02:13:56,570 --> 02:14:00,210 on our side, then we'll go ahead and route it through to the appropriate channels. 1432 02:14:01,190 --> 02:14:02,150 Great, thank you. 1433 02:14:02,810 --> 02:14:12,570 And the only other one that I was wondering about is that the code review, are we still expecting some sort of 1434 02:14:16,310 --> 02:14:17,790 agendas topic on that? 1435 02:14:18,450 --> 02:14:22,310 Yes, before the end of this year, this will come back to the commission. 1436 02:14:27,870 --> 02:14:28,430 Okay, 1437 02:14:31,050 --> 02:14:35,730 great. Thank you. Okay. Are there any other planning commission reports? 1438 02:14:38,440 --> 02:14:42,300 All right, secretary reports. Nothing to report tonight. Okay. 1439 02:14:43,940 --> 02:14:50,820 With that, I'm going to adjourn the meeting until the next planning commission hearing on September 17th with that we're done.