[0:00] [0:03] All right, ladies and gentlemen, just last. [0:05] We got 30 seconds or so to go here. [0:08] Nobody heard that. [0:10] Nobody heard that. [0:11] [0:29] All right, ladies and gentlemen, we [0:31] will call the Tuesday, September 8 Faribault [0:34] city council meeting to order. [0:36] Our first item on tonight is roll call. [0:39] Council Barnes here. [0:40] Ross, here. [0:41] Here Here mayor Spooner here. [0:45] Pledge of Allegiance. [0:49] I pledge allegiance to the flag of the United States of America [0:52] and to the Republic for which it stands. [0:56] One nation under God, indivisible, [0:59] with liberty and justice for all. [1:01] [1:06] Second item on tonight's agenda is approval of the agenda. [1:10] Mandy Barnes, Mayor Spooner, I make a motion to move item 8 f [1:14] to approve the appointment of Kim Anderson [1:16] to the vacant city council position. [1:18] To immediately follow the approval of the agenda. [1:23] Second is there's a motion and a second to approve [1:29] the agenda, as amended by Barnes and Van sluice. [1:33] All those in favor, signify by saying Aye. [1:35] Aye all opposed. [1:38] That is approved. [1:39] Mayor Spooner, next, I make a motion to approve [1:42] the agenda, as amended. [1:45] Correct second. [1:48] So moved. [1:49] There's a motion and a second. [1:50] All those in favor, signify by saying Aye. [1:52] Aye All opposed. [1:54] [2:03] If you would please raise your hand. [2:08] If you'd please raise your right hand and repeat after me. [2:11] Kim Andersen, do solemnly swear. [2:15] Do solemnly swear. [2:16] To support the Constitution of the United States. [2:19] [2:21] And of the state of Minnesota. [2:25] And that I will faithfully discharge. [2:29] The duties of the Office of city council member. [2:33] The city council of the city of Faribault, Minnesota. [2:37] Faribault, Minnesota to the best of my judgment and ability. [2:43] Congratulations Thank you. [2:46] [2:53] All right. [2:53] Next is. [2:54] We have several presentation and introductions tonight. [2:57] First off, Chief dusty Dietz on. [2:59] [3:07] Thank you, Mayor and council. [3:08] Tonight, we're here to swear in Captain Chris Bauer. [3:15] Come on up. [3:16] And administrator Kinser will read. [3:20] Hopefully this won't be bad. [3:21] We've had an example, so. [3:23] OK, if you can, please raise your right hand [3:24] and repeat after me. [3:26] Chris Bauer, Chris Bauer, do solemnly swear. [3:29] Do solemnly swear to support the Constitution of the United [3:33] States, to support the Constitution of the United [3:37] States and of the state of Minnesota, [3:42] the state of Minnesota. [3:43] And that I will faithfully discharge [3:45] that I will faithfully discharge the duties [3:47] of the Office of fire captain. [3:49] The duties of officer of the city of Faribault, Minnesota. [3:53] The city of Faribault, Minnesota, [3:55] to the best of my judgment and ability [3:57] to the best of my judgment. [3:59] Congratulations so a lot of Chris's family is here [4:10] and his wife will pin his badge on. [4:12] Chris has been with us with the Faribault fire department for 25 [4:16] years, 10 of that full time. [4:19] And I look forward to working with him in his new capacity [4:22] as a shift captain. [4:23] Badge number 2160 5 and I was. [5:05] All right. [5:05] Up next, Chief police Chief John Sherwin. [5:10] Mayor, members of the Council, we [5:12] kind have a unique recognition and award presentation tonight. [5:19] I'm about to call a lot of names for people to come up here, [5:22] but I want to tell you a little bit about the incident. [5:23] First, during the morning hours of August 6, [5:28] it was business as usual at the community center [5:30] here in Faribault, when suddenly a medical emergency [5:34] happened and a gentleman went into cardiac arrest. [5:38] Members of city staff, city employees [5:40] sprung into action, initiating CPR, retrieving an AED, [5:46] applying the pad, calling first responders, working in a team [5:51] to get life saving aid to this individual. [5:55] Faribault police officer arrived on scene. [5:58] Faribault fire and North Memorial [6:00] paramedics all responded. [6:03] Again working as a team. [6:05] And we ended up. [6:06] What ended up happening is this gentleman survived thanks [6:09] to the actions of city employees, [6:11] citizens who happen to be inside the community center as well [6:15] as Faribault first responders. [6:16] So we want to take a moment and recognize [6:18] that tonight before the council, I said it's a recognition. [6:22] It's kind of a community celebration, I think, [6:24] because it shows the type of teamwork [6:25] that we have here in our city and that when lifesaving action [6:30] is needed, people step up. [6:32] So when I call your name, please come forward if you're here. [6:35] Not everyone could make it tonight, [6:37] but we're going to call her citizen Julie Weir. [6:40] [6:47] City employees. [6:48] Rachelle anderholm parsh Devin Stacy. [6:54] Jensen, Mary targee Kevin O'Brien. [7:01] Chloe Christensen. [7:03] Firefighter Rick Martinez. [7:05] Firefighter John Bargo, police officer Christopher Farris. [7:10] And then North Memorial ambulance paramedic Javier [7:13] Barajas and EMT Michelle Bauer. [7:15] [7:24] Here we talk about the values of the city a lot. [7:30] Obviously, the city employees exceeded [7:32] those values and working together as first responders. [7:36] I mean, this is your job. [7:37] This is what you do every day. [7:39] But we don't save someone's life every day. [7:42] And when that happens, we want to recognize that. [7:44] And thank you for your efforts. [7:46] We have some certificates and things for you. [7:48] I think we'll hand them out in the hallway [7:50] because I'm not sure of the order. [7:52] But again, thank you for your efforts. [7:54] We appreciate it. [7:56] Thank you. [7:56] [8:05] For your medical professionals. [8:07] [8:10] Thanks, everyone. [8:11] We thank you. [8:13] [8:16] Oh, I'm so sorry I screwed this up. [8:19] I knew I was going to do this. [8:20] This is too much pressure. [8:23] Not only are as a city recognizing these individuals, [8:27] but we also have the Red Cross in attendance tonight. [8:30] Melanie with the American Red Cross [8:32] would like to come if you'd like to come forward. [8:34] And I can get you a microphone somewhere. [8:39] [8:46] Thank you. [8:47] I'm Melanie cheat. [8:48] I'm the executive director for the Southern Minnesota chapter [8:50] of the American Red Cross. [8:52] Not sure where to stand. [8:53] I don't want to stand in front of all of you. [8:55] Sorry I'm going to stand in front of you. [8:58] It is part of the American Red Cross mission [9:01] to train people so that when emergencies occur, [9:05] there are individuals who are ready and able to respond. [9:09] And so we have nominated six individuals for awards [9:15] from the American national Red Cross. [9:18] This is a program that has been around for about 100 years. [9:21] And every year, we recognize somewhere [9:23] around 300 or 400 people who use life [9:26] saving skills to save a life. [9:28] And so not all of the individuals [9:31] who are part of the emergency response teams [9:36] will receive the awards. [9:37] But we do have the six people that we would like to recognize [9:42] as what we're sort of calling the Faribault community center [9:45] life saving response team. [9:47] And that will be Kevin O'Brien, Mary Taji Taji, Rachelle [9:53] anderholm Parrish, Stacey Jensen, Devin [9:57] puharic and Chloe Christiansen. [9:59] We have a certificate for you and [10:01] some Red Cross pins that we would [10:02] like to present to you as well. [10:04] [10:11] And one thing I'd like to mention, [10:13] it's my understanding the individual survivor who does not [10:17] live in Faribault, but was here temporarily, [10:20] is now watching from home. [10:22] And if you're watching, we are so glad you're with us [10:25] and be able to view this and from Arizona. [10:30] So I just wanted to mention that for everyone. [10:33] So thank you. [10:34] [10:37] Yeah thank you. [10:43] Thank you. [10:44] Here we go. [10:45] [10:47] Oh, yeah. [10:48] The two brothers. [10:50] Oh hey, Rochelle. [10:53] That's for you. [10:55] Chloe Chloe. [10:57] Chloe Devin's not here. [11:07] Kevin Kevin. [11:10] There OK hey, Chloe. [11:14] I have yours right there on top. [11:16] [11:36] Yeah all right. [11:42] On item number 4, approval of the minutes of August 25 5 [11:46] August. [11:47] Close special meeting on August 25. [11:51] Closed meeting on August 25, another [11:54] closed meeting on August 25 and a meeting on September 1. [12:00] So moved. [12:02] Second Motion by Vance Luce. [12:06] No deal. [12:08] Second by Ross. [12:10] All those in favor. [12:11] So it was Rowan. [12:13] Rowan? [12:14] yeah. [12:16] Motion by Rowan. [12:17] Second by Ross. [12:18] All those in favor, signify by saying Aye. [12:21] Aye All opposed. [12:23] No spouse request to be heard. [12:26] We have none tonight. [12:27] Heather on to consent agenda items. [12:34] We have six a through J. Mayor Spooner I'll make a motion [12:39] to approve consent agenda items 6 through J second motion [12:44] by Ross, second by Barnes. [12:47] All those in favor of 6 through six signify by saying Aye. [12:50] Aye All opposed. [12:52] Those are passed. [12:56] Public hearings tonight. [12:57] We have none. [12:58] Items for discussion. [13:00] First up, item A ordinance 2026 12 approval of a zoning [13:07] map Amendment. [13:09] Dave Weinberg, Mayor and council. [13:11] On August 25, the council approved the first reading [13:14] of an ordinance to rezone the property at the Northeast [13:17] intersection of 38th Street Northwest [13:20] as well and Bagley Avenue. [13:22] The property is getting rezoned from UD [13:25] or transitional urban development [13:28] to I-1 light industrial. [13:31] Since the first reading of the ordinance, [13:33] there's been no changes to the ordinance at all, [13:35] so we recommend through a roll call approving [13:39] the second reading of the ordinance and then [13:41] with the separate action and a motion [13:44] to approve the summary publication of that ordinance. [13:49] Amendment thank you David. [13:51] Any questions, Mayor Spooner. [13:53] Yes I'll make a motion to approve ordinance 2020 6-12. [13:57] Second Motion by Ross. [14:00] Second by Vance Lewis. [14:01] On ordinances. [14:02] Roll call. [14:03] Council Member. [14:04] Anderson I Barnes I Ross, I mayor [14:10] Spooner I. On to the publication of the ordinance. [14:15] Mayor Spooner I'll make a motion to approve [14:18] the summary publication of Ordinance 20 6-12. [14:21] Second Motion by Ross. [14:24] Second by teal. [14:24] All those in favor, signify by saying Aye. [14:26] Aye All opposed. [14:28] Those are both. [14:30] Item B resolution 2026 261. [14:34] Preliminary property tax Levy establishment. [14:37] Jessica Kinser, city administrator. [14:40] Yes so I'm actually going to do a quick little presentation that [14:43] involves item C and item D, which is for the Eda and the HRA [14:48] preliminary levies as well. [14:50] So that will be included in here. [14:53] So we've put a few months of work together. [14:57] Oops there we go. [15:01] We've through a few months. [15:02] We've put together a preliminary tax Levy that just kind of want [15:05] to run through the basics of it with you and then get to the end [15:08] where we'll talk about what happens next. [15:11] As a reminder, how we get here is really we [15:15] get a large number of that is our market value that [15:19] then gets reduced down ultimately into what [15:22] is gross tax capacity. [15:26] That then gets narrowed down even further [15:28] into net tax capacity, which the net [15:32] is really what we work off of. [15:33] And the net tax capacity is basically the gross tax [15:36] capacity, less the TIF. [15:38] So some just interesting little things. [15:40] Overall our market value grew by 2 by 5.4% between 2025 and 2026, [15:47] it was at 6.4% We are looking at a net tax capacity increase [15:55] of 3.5% from last year. [15:59] It's now 5.8% so there are more dollars available that we could [16:04] Levy as taxes for the city. [16:07] And so what we're looking at and we'll get into this, [16:10] is a 13.6% increase in the total dollars needed from the tax Levy [16:17] from 2026 to 2027, which translates [16:21] into an 8.58% increase on property [16:26] tax owners or property owners. [16:29] So we put together this little residential impact chart. [16:31] In the next one will be a commercial [16:33] 305,000 is the median, the median sales price. [16:37] So we kind of thought that was a good place to start. [16:40] So if you had a house that was valued at 305,000in 2026 [16:44] and there was no increase in the value whatsoever, it would be [16:47] an 8.58% increase or $126.39. [16:52] And so the big assumption that's used in putting these numbers [16:55] together is really that there's no value increase [16:58] in the property from your 2020, 2025 to 2026 actual values, [17:06] so that we know that's not the case for most properties. [17:09] Most properties are seeing increases, [17:11] but it's hard to try and figure that in when talking [17:15] about what the city is looking at in general [17:18] with our total tax request. [17:21] The other side, it's also an 8.58% [17:23] increase for commercial and industrial customers. [17:27] We put together just a few different scenarios there. [17:29] Obviously, the higher the market value, the more we will see, [17:35] the greater the property tax increase there [17:38] when we look at what is our actual rate [17:42] and where we sit here at the preliminary Levy, [17:44] looking back at four years of actual we're proposing that we'd [17:49] essentially be using 55.95% of the total tax dollars that are [17:53] available, which would translate to 55.95% on the value [17:58] of any individual property. [18:00] As you can see in a five year view, [18:02] it is the highest that it's been. [18:04] And looking back at history, the last time it was higher [18:07] than 55.95 was 2018, when the tax rate was 57.182% [18:15] And so this is really a percentage [18:18] ratio that gets applied to a number of other things. [18:22] As we talk about what it means to an individual property [18:25] and how that will play into the property tax receipt [18:27] that we'll get up and running this year. [18:29] So when we look at that total tax Levy of $16.5 million, [18:34] there are four different things that [18:36] really make up that tax Levy and that's our general fund. [18:40] The community and economic development [18:41] fund, our tax abatement fund. [18:43] And then our debt service funds, which each debt [18:46] service runs in its own fund. [18:48] So we compile them together for the view that you have tonight. [18:51] And so you can see general fund and tax abatement have gone up. [18:54] We'll talk a little bit more about those in detail. [18:56] Community and economic development and debt service [18:58] actually went down for the general fund. [19:02] We're looking at a total budget of nearly $27 million [19:05] in expenditures of. [19:08] When we look at the revenue side of things, [19:10] we really look at Lea is our second largest revenue. [19:14] Local government aid is our second largest [19:16] revenue in the general fund, and that's 26% in proposed for 2027. [19:23] The next portion or the other, the highest revenue [19:26] is property tax revenue. [19:28] And so that is where things have been shifting more in a ratio [19:33] in 2020 in 2026 or for 2026. [19:38] Lga was 28% of the property or of the total revenue [19:42] composition, so that's changing as we see [19:46] Lea stagnating a little bit. [19:49] Our total personnel expenditures are nearly $20 million [19:52] and we're at 73.4% of the budget, which is actually where [19:56] we were last year at this time as well, [19:58] with 73.4% of the budget. [20:01] And then I just realized I did not [20:02] do a breakdown of the expenditures [20:05] for how they broke down by function. [20:08] But I will get that to you. [20:09] I did not add the chart into the presentation, but again, our [20:13] we're looking at general fund expenditures. [20:16] General fund revenues at 26.8 million [20:19] is where we're at for the preliminary Levy. [20:23] In talking about fund 240 for community and economic [20:26] development, we are proposing just over 403,000 in property [20:31] tax revenue to support the community and economic [20:33] development fund, which really doesn't have [20:36] a ton of revenue possibilities. [20:38] There are administrative fees that are collected from the H&E [20:42] and the Eda, and then also from a public housing for any time [20:46] that we're spending on public housing, [20:48] and that's budgeted at 150,000. [20:51] Also, for 2027, we have an additional 150,000 of revenue [20:55] to set off 150 offset, 150,000 in expense for the updating [21:00] of the unified development ordinance, kind of year one, [21:04] where there's transfers in from the Eda and from the H&E, [21:07] which count as revenue, and then use [21:09] of fund balance from this fund specifically [21:12] to help pay for that. [21:14] The expenditures did increase from 2026, [21:17] where we were at $550,000, up to 703,000, [21:22] which is really the result of adding [21:24] in the Udo as an expense there. [21:27] The good news was when we were sitting here last year, [21:30] there was a negative cash balance in this fund that had [21:33] really been ongoing since 2023. [21:38] And what we did was we transferred money [21:41] into this fund from the general fund to say, [21:44] we want to deal with this now and not [21:46] have this negative continually carry over onto the tax Levy. [21:49] And so, fortunately, Dave and his departments prudent spending [21:54] actually left 2025 with a positive cash balance as well. [21:58] And so there's some dollars there [22:00] that we can use to support the cost of the Udo [22:04] without actually having to add that into the tax Levy. [22:07] So right now we're on track to also have a positive cash [22:11] balance at the end of 2026 as well [22:13] to the next fund tax abatement. [22:16] So this one is changing that saw an increase from 2026 to 2027. [22:21] Pardon my error there. [22:23] We're requesting just about 188,000. [22:27] And it kind of breaks down in a few different ways [22:29] where we've got three business some subsidies to Steiner taken [22:33] in to view this will be true. [22:35] View second year of a 10 year tax [22:38] abatement, but this will be taken in Steiner's last year. [22:42] So 2027 those abatement agreements [22:45] will have been exhausted and they will be paid off. [22:49] While we know that there will be some payments dropping [22:51] off in 2028, we expect that KGB will be starting at that point. [22:55] So that's kind of where this is always sort of a change in how [23:00] this is going to fluctuate. [23:02] The other thing that I'll mention, [23:03] that's the bottom line there is the tax abatement bonds that we [23:06] issued have a debt service schedule for tax abatement [23:09] and a debt service schedule for the debt service Levy. [23:12] So this will show up in two places on the exhibit [23:16] to the resolution. [23:17] And what ends up happening for the tax abatement portion [23:20] is it's going to increase over the next 15 years, [23:23] while the debt service portion is going to decrease. [23:26] And so there's an interesting setup there [23:28] where there's going to just naturally be some tax abatement [23:31] increase because we have a 15 year bond where [23:34] the schedule has been set up. [23:35] That way, when we get into the debt levies there, [23:39] there was a reduction here. [23:41] And there's some good news that 15 or 15 a refunding bond series [23:46] ends in 2027. [23:49] And I believe we'll be talking more about that as we [23:51] go here into the final Levy. [23:54] As I mentioned, the 2026 on the debt side starts in 2027, [23:58] but we see a declining payment in that over the next 15 years. [24:04] And so while the tax abatement starting at 100,000 [24:08] for principal and interest, the debt side is at 278,000, [24:12] almost 279,000. [24:14] So you can see how there's a difference there [24:17] that there is an inverse where it [24:18] will cross over time to switch. [24:21] We are not proposing any new debt for 2027 and that [24:25] we've tried to structure the first draft of the capital [24:28] improvement plan to really group any future debt that would be [24:33] needed into even number of years so that we don't end up with [24:36] these off years where there might be 400 or 500,000 [24:40] that's needed, which is not enough [24:42] to go pursue any borrowing for. [24:44] When you think about the cost of borrowing and trying to actually [24:47] build up years where there's future years where there's [24:51] enough that it makes the financial cost of pursuing [24:54] a bond make sense for the amount of money [24:56] that you need to borrow. [24:57] And council member Ross's favorite chart. [25:01] This is where things look like in 2027 through 2041. [25:05] Without adding any new debt after 2027, [25:09] from what we've had some initial conversations about, [25:11] we know that that's probably not the likely case moving forward. [25:15] But there will be more discussion of that [25:17] as we go into the next budget cycle for 2028. [25:23] Some other things to point out is [25:25] I mentioned that we'll have of the 15 [25:28] a refunding portion pay off in 2027 will have a 21 2021 be [25:35] refunding bond pay off in 2029 and then [25:38] the 15 an improvement bond. [25:42] There was things put together will pay off in 2030. [25:45] So we do have some debt retirements that [25:48] are in our very near future. [25:52] Talk really quick about the HRA and the Eda levies. [25:56] At the max Levy, which is what's presented to you in resolution [26:00] 2026 262 and 2026 263, there would be 465,000 that the HRA [26:09] would have to collect at the maximum, [26:12] and then 400, almost 456,000 for the Eda to collect as a maximum. [26:17] The final budgets would be presented to the city council [26:22] in November, following each board adopting their final tax [26:26] Levy and final budget. [26:28] So more to come about what those dollars [26:30] would specifically be used for. [26:32] And then just to promote this here again real quick, [26:36] we don't have the preliminary tax Levy on the city taxpayer [26:40] receipt live currently. [26:42] But we should by the end of the week. [26:43] And so we'll do some more promotion of that where [26:46] we encourage people to go up and to go out and look up [26:48] their values and then enter their values into the calculator [26:53] to see how your tax dollars break down [26:57] for the city portion of the tax Levy, and by what department [27:01] they go to. [27:03] So next steps, as I mentioned, after tonight [27:05] we will roll out that poll tax receipt [27:07] with the preliminary tax Levy. [27:10] We're going to have some additional budget [27:12] workshops for obviously the utility funds. [27:14] That's October 6 and then special revenue funds. [27:17] I think we're going to be splitting in a few different [27:18] ways as to when they are available. [27:21] The one thing that we haven't really talked about in depth, [27:24] but I do want to know you were heard with your direction [27:28] as to where you want to see that final tax Levy, that 8% range [27:33] that will have a special work session on October [27:35] 13 for general fund cost containment proposals [27:39] to come forward to you for consideration so that we can [27:43] there's probably some things that would require changes [27:46] before January one that we would want [27:48] to talk about as part of that. [27:50] So we thought the earlier that we could get things [27:52] in front of you and get consensus on moving some things [27:55] forward, the better it would be for a smooth transition [27:59] actually into calendar year and fiscal year 2027. [28:03] Our final review of the or of the final tax Levy [28:07] will come at the December 1 work session. [28:09] That's the last opportunity for any changes. [28:12] I hope that we're there well before we actually need to be. [28:17] And then December 8 will be that city council meeting where [28:20] you'll have the final tax levies for the city tax Levy, [28:24] as well as the HRA and the ADA in front of you [28:26] on that evening for consideration. [28:28] So that's all I have. [28:29] I'm happy to answer any questions [28:31] if there are any, to have any questions for staff. [28:37] All right. [28:38] The general public out there, the state regulations [28:42] that we have to set our preliminary Levy in September [28:47] and we will approve the final Levy December 8. [28:54] Go around as a budget sitting up here now, every one of them [28:58] have been lowered by. [29:01] No, by no means this is just a guide which we go by. [29:06] And in the state regulations we cannot go up from here. [29:12] So this will be the max. [29:14] But we've always done. [29:17] All right. [29:17] We have three items regarding this. [29:19] I'll take motions. [29:21] Mayor Spooner. [29:22] Yes I make a motion to approve resolution 2026 261. [29:29] Second Motion. [29:31] Second by Ross on resolution 2026 261. [29:35] All those in favor, signify by saying Aye. [29:37] Aye All opposed. [29:40] Mayor passes. [29:41] Yes I'll make a motion to approve resolution 2026 262. [29:46] Second Motion by Ross. [29:48] Second by van sluice on resolution 20 2662. [29:52] All those in favor, signify by saying Aye. [29:55] Aye All opposed. [29:57] May I make a motion to pass resolution 2026 263 second. [30:07] Motion by Barnes. [30:08] Second by van. [30:09] Sluice on resolution 2026 263. [30:14] Aye all opposed. [30:17] That passes. [30:18] On to item E resolution 2020 6-2 70. [30:22] Approval of plans and specifications for bid date [30:24] on Westwood drive Mr. Marc Ducharme. [30:29] [30:32] Thank you, Mayor, council members and the public. [30:34] Before you tonight is a resolution [30:35] to approve the plans and specifications [30:37] and establish a bid date for the Westwood drive [30:39] stormwater treatment structure. [30:41] Contract 2020 6-15. [30:44] So a couple of years ago, about five years ago, six years ago [30:46] now, the MPCA revised our municipal separate storm sewer [30:50] system permit or MS4 permit that changed [30:53] the rules regarding stormwater treatment [30:55] for reconstruction projects. [30:57] Linear projects used to be somewhat [30:59] exempt as long as you didn't increase the impervious surface. [31:02] Now they no longer look for just increases, [31:04] but they also take into account reconstructed impervious [31:06] surfaces. [31:08] So we are required now to look for water quality treatment [31:11] where none previously existed when we reconstruct roads. [31:14] Two years ago we did Westwood drive from Highland place [31:16] to Valley View. [31:19] We tried to work with some property owners [31:21] to find some space to do some treatment along the corridor. [31:23] We were unsuccessful. [31:24] So the next step is to look for off site and regional treatment. [31:28] We were able to identify a location within the right [31:31] of way of Lindale. [31:32] So we'll be between Lindale and Faribault road. [31:35] They're kind of just South of Faribault. Senior [31:37] living out there in the Big green space [31:38] on the West side of the trail. [31:40] To install a water quality structure that will allow us [31:42] to meet the requirements of our MS4 [31:44] permit for treatment, not only for the Westwood drive project, [31:47] but this structure will also provide the required treatment [31:49] for future road projects in that neighborhood [31:51] that drain through this same common system. [31:54] So before you tonight, is that resolution to approve the plans [31:57] and specs and set the bid date. [31:58] Estimated project costs, including [32:00] contingency and engineering fees for this project, is $230,000. [32:05] This will be fully funded out of our stormwater utility fund. [32:09] We're looking at a bid opening date [32:11] at the end of the month for award of a contract [32:13] at the first meeting in October, pending lead times. [32:16] These are specialty structures. [32:17] Pending lead times. [32:18] This likely will be a spring of 2027 project. [32:21] But just like everything, we'd like to lock in costs now [32:23] before there's any inflationary increase [32:26] or any other related increases that may come [32:29] upon us from outside forces. [32:31] So we will be back before you to finish this project up, [32:35] likely next year. [32:36] Any questions. [32:37] I gladly stand for any questions for director [32:41] at this time I'll entertain a motion. [32:44] Make a motion to approve resolution 2026270. [32:48] Second Motion by second by Teel on resolution 20 2670. [32:54] All those in favor, signify by saying Aye. [32:57] Aye all opposed. [32:59] That passed f on item g resolution 2020. [33:06] Mayor Spooner. [33:07] We actually we moved the item, but then we [33:10] forgot to actually consider it. [33:12] And so we do need to vote on 273 because we [33:16] did not vote on 273 where we moved it to on the agenda. [33:20] We didn't name it, but we voted on it. [33:23] You voted on amending the agenda and then we didn't move it. [33:27] So that is my error. [33:28] I think I got two. [33:30] Yeah that wasn't in the script. [33:31] That was I think our. [33:36] So we should do that now. [33:38] Mayor Spooner. [33:39] Yeah I'll make a motion to approve resolution 2020 6-2 73. [33:43] Second second. [33:46] Motion by Ross. [33:48] Second by Barnes. [33:49] All those in favor of resolution 2026? [33:52] 273. [33:54] All those in favor, signify by saying Aye. [33:56] Aye all opposed. [33:58] That passes. [34:00] Good legally forgotten. [34:02] We're good. [34:03] You called it. [34:03] Kim, you're going to put it in writing for me. [34:07] You gotta keep it straight. [34:08] I mean, come on. [34:09] Kim called it. [34:10] She all right. [34:12] G resolution, 2020 6-2 76 approving a cannabis business. [34:18] Zombies there's. [34:21] Here you are. [34:21] Here we go. [34:23] So Michel Keller, on behalf of Faribault greens, [34:25] has submitted an application for a cannabis business [34:28] at their current location, located at 1512 30th Street [34:31] Northwest Faribault greens has already been issued a license [34:35] number by the Office of Cannabis Management, allowing [34:38] for their micro business. [34:40] However, due to increased demand of their current business model, [34:43] they're requesting to increase their production. [34:46] Their current license only allows for up to 5000ft of plant [34:50] canopy, and the business will allow for up [34:52] to 15,000ft of plant canopy. [34:56] They have met all planning regulations [34:59] and are in the process of completing a couple just [35:02] building code requirements, and once those are met, [35:05] we'll work with the Office of Cannabis Management [35:07] to issue a upgrade in their license to a business. [35:13] Will continue to they hold a manufacturing [35:16] endorsement as well, and they'll continue [35:18] with their manufacturing. [35:21] Any questions, Mr. Ross. [35:23] Thank you. [35:24] Mayor hi, Heather. [35:29] Look at number 12 package and label, [35:32] adult use cannabis flower and so on. [35:34] [35:37] For consumer products for sale to customers, [35:39] is it going to be a retail store there. [35:42] The representatives from the company are here. [35:45] I'm not sure. [35:45] They have not applied for a retail endorsement. [35:49] No retail. [35:50] They will not be doing retail at this time. [35:51] So it's just simply packaging and wholesaling I assume. [35:55] So each one of these 12 items on this list are let's see, [35:59] I think it actually increased 14 on this list. [36:01] Are they need endorsements for each of those. [36:04] So as they're getting those endorsements [36:05] they'll come back to you for approval. [36:07] OK thank you. [36:08] No more questions, Mayor. [36:10] OK Any other questions. [36:13] At this time, I will entertain a motion, Mayor Spooner. [36:16] I would love to make a motion for a resolution. [36:18] 2020 627 six seconds. [36:25] I can give it to Kim. [36:28] I'm alive was my second by Anderson. [36:33] All those in favor of resolution 2026? [36:35] 276 saying Aye. [36:37] Aye all opposed. [36:40] Motion passes under item h. [36:43] Resolution 2020 6-2 71 order improvements. [36:47] And Marc Duchene. [36:50] [36:58] It's not going to cooperate. [37:00] [37:05] For two. [37:07] Thank you. [37:07] Mayor members of the Council and the public before you tonight [37:10] is another resolution to approve plans and specifications [37:12] and establish a bid date. [37:13] This one's for our 2025 miscellaneous water [37:16] main improvements. [37:17] Yes, that is correct. [37:18] We started this project actually about three years ago. [37:20] It took some time to work through the permitting process [37:23] with MnDOT, but we did finally receive [37:25] permitting approval from MnDOT. [37:26] So we're moving the project forward [37:27] for bidding at this time. [37:28] This project is for segments of water main [37:31] that either have that currently exist and need [37:33] replacement due to a substantial history of breaks [37:36] and other issues. [37:38] Or there's a couple segments here [37:39] where we're actually going to connect a couple dead end [37:41] water main segments to provide a loop [37:43] for some redundancy and better fire [37:45] protection for some properties. [37:47] So those segments are generally around the front of the Grand [37:50] state property, along Highway 21, along Highway 3, [37:54] through the crossroads professional building property [37:56] connecting their water main. [37:57] So they are fed from two ways not a single loop replacing [38:01] the water main along Trunk Highway 21 [38:02] from seventh Street Northwest to Bradley road, [38:05] and then connecting two dead end water [38:06] main loops around the backside of the old Jenova [38:09] or vogelsberg trucking, now the jennie-o turkey [38:12] store plant there. [38:13] There's some dead end water mains up [38:14] there that will be connecting. [38:15] So all these water mains will be directionally drilled. [38:18] Minimal digging involved in here. [38:21] There's multiple reasons why we're pursuing this, [38:24] but with that we are looking for approval of this project, [38:27] estimated at $1.375 million. [38:29] And that includes, again, contingency [38:31] and engineering costs. [38:33] Pending approval tonight, we have a bid opening date [38:36] again at the end of September. [38:38] Come back October 13 for bids. [38:40] This one will likely spread out across the calendar year to. [38:44] We'd like to get a couple of the shorter segments done this year [38:46] if there's contractor availability. [38:48] Otherwise this could all stretch out into 2027 now. [38:53] So I will stand for any questions, [38:55] but ask you to consider resolution 2026 271. [38:59] Any questions for director. [39:02] So was the funding for this already allocated in 2025 [39:06] put into a side fund. [39:07] No, actually it was budgeted into 2026. [39:10] OK thank you. [39:11] We just rather than encumbering it moving [39:13] forward because we hadn't really spent anything, [39:15] we just budgeted it. [39:17] Got it. [39:18] Thank you. [39:18] [39:22] I make a motion to approve resolution 2020 6-27. [39:26] One second motion by Barnes, second by Ross. [39:30] All those in favor. [39:31] Resolution 2026 271. [39:34] Signify by saying Aye. [39:35] Aye all opposed. [39:37] That passes on to bids. [39:39] Resolution 2020 6-2 33. [39:43] Two rivers siphon once again. [39:45] Director mark. [39:46] [39:50] Thank you. [39:50] Mayor members of the Council and the public before you tonight is [39:52] awarding a contract to Guissinger and sons incorporated [39:55] in the amount of $1,850,719 for the two [39:59] rivers siphon crossing project. [40:01] As you recall, this project was bid back on August 10. [40:05] The bids came in, as you can see, [40:06] substantially above, what the engineers [40:08] had estimated for this project. [40:10] So we have held the bids back. [40:12] We are allowed to do that through the bid documents [40:14] for up to 60 days on this case. [40:16] And we've been working with the contractor [40:17] to find some value engineering processes [40:20] and replacements for this contract [40:21] to try to bring the cost down. [40:23] I'm happy to report that we have found about $175,000 in savings [40:28] on this contract, so we are recommending tonight to award [40:31] Guissinger and sons based on their bid amount of 1.85, [40:35] and then we will come back at a later [40:37] date with the formal change order to remove [40:40] $176,000 worth of costs. [40:42] So this brings it down to where we [40:44] had it budgeted and estimated. [40:46] We've had a lot of discussions about [40:48] should we just rebid the project with these value [40:50] engineering items in there, see if we can do a little bit. [40:52] Better yet, when we weigh the pros and cons, [40:55] I don't know that it's there. [40:57] There's as much chance that we'll pay more as there [40:59] is that we'll save any more. [41:00] So staff is recommending I said, that we award this contract [41:05] to Guissinger and sons contingent on the processing [41:07] of a change order. [41:09] Any questions Mr. roff? [41:11] Thank you. [41:12] Mayor director Duchene, I think you kind of answered [41:14] my question, but what was the engineer's [41:16] estimate on this 1.53? [41:19] OK, so they were about 300 over. [41:22] We able to get a little bit more than half of that [41:24] back through some changing some. [41:26] We had designed some things to an ideal situation [41:29] and then looked at the cost and said, well, [41:30] we can live with something. [41:32] And so we're going to get it down to about [41:33] 1.6 something, something. [41:37] Yeah OK. [41:38] Thank you. [41:39] No more. [41:40] [41:45] Mayor Spooner. [41:47] I'll make a motion to approve resolution 2026 233 second. [41:56] Motion by Ross. [41:57] Second by Teel on resolution 2026 233. [42:00] All those in favor, signify by saying Aye. [42:02] Aye all opposed. [42:04] Passes resolution 2020 6-2 72 the relief [42:09] tree program once again. [42:12] Thank you. [42:12] Mayor, council members and the public. [42:14] Last bid tonight is for the relief tree removal program. [42:18] As you recall, this is a Minnesota DNR grant [42:20] that the city staff applied for and was [42:22] awarded to remove diseased and dead ash [42:24] trees throughout the community. [42:26] We had an application process. [42:28] The grant requirements were such that you [42:30] had to be income qualified. [42:32] These were to benefit properties of lower incomes [42:34] in the community that had diseased trees [42:36] that needed to be removed. [42:38] So through the grant process, we got applicants [42:40] we were able to get I believe it was around 114 trees [42:43] funded through the project. [42:45] Bid those out. [42:46] We received three bids last Wednesday, September 2. [42:49] As you can see, the low bid came from [42:50] cars tree service at $173,737. [42:55] Cars tree service also received the low bid on the previous tree [42:58] removal program. [42:59] So they're going to be busy in town. [43:01] They've got well over 200 and some trees [43:03] to get cut down before next June. [43:06] But with that I did talk to cars and they [43:08] are aware of all the timelines and requirements [43:11] and they have adequate staff to perform as needed. [43:15] So we are recommending approval of the contract [43:17] to cars tree service for the relief grant program. [43:22] Any questions for the director. [43:25] Mark these are trees that have already been identified [43:31] and approved to be cut down. [43:34] What percentage do you think that is of what needs to happen. [43:37] Oh, geez. [43:40] We did a program last year. [43:42] We've done two programs this year. [43:44] I'll say we're putting a dent in the things around town. [43:48] There's also been numerous private property [43:49] owners that have taken care of the trees on their own. [43:52] I mean, you can drive around town in certain areas of town, [43:54] the Four Seasons area, it's stark. [43:57] All the old big trees that used to be there are gone now. [44:00] But I can follow up with you, MS Anderson. [44:03] Parks department, I believe, has a better count of trees. [44:06] I mean, we've done hundreds in our own parks. [44:09] So it's just out of curiosity, how [44:12] are the trees identified that are being [44:17] accounted for in this bid. [44:18] So the relief program was pretty specific to ash trees. [44:22] So the city actually had a contract through the grant. [44:25] It's funded through the grant with river bend nature center. [44:28] We contracted with staff at Riverbend nature center. [44:30] They actually made contact. [44:32] They did the intake, the initial intake of the applications. [44:36] We put together a simple application. [44:38] They did the initial intake, made contact with the property [44:40] owner, went out there, identified the tree, determined [44:43] whether it qualified or not, did the income verification for us, [44:46] and then just gave us a finished list. [44:48] So this program was pretty thoroughly vetted, I would say. [44:53] The other program that we awarded [44:54] last week or last council meeting, [44:57] it was more of just a volunteer. [44:58] We had staff go out and look at them and identify them. [45:01] I think we're even I'm getting good at identifying ash trees. [45:06] There's a lot of them out there. [45:07] Yeah thank you Mr. Duchene. [45:12] With this relief program, is all of the trees at car tree service [45:17] removing going to the nature Center, [45:19] or are they taking some of them. [45:22] So the part of the nature center's contract [45:25] is they also are going to create a biochar. [45:27] I think that's what it's called. [45:29] A biochar. [45:30] [45:33] Site I guess where they do, they are going [45:35] to take some of the trees. [45:36] They say they want them all. [45:38] I don't think they realize how much it really is going to be. [45:41] So the contractor is going to coordinate with the nature [45:44] center to bring them as much as they want, and then they burn [45:48] them and blend them with some other materials, [45:50] and they create biochar, which I understand is used for gardening [45:53] and some other soil Amendment projects. [45:56] But we are allowing them to also for both contracts, this one [46:02] and the previous one, and we are offering [46:04] the city compost site for tree disposal [46:07] too as part of this contract. [46:08] Try to save taxpayers some money that are [46:10] participating in the programs. [46:12] The relief program is at no cost to these homeowners. [46:14] The grant covers 100% of the tree removal, stump removal, [46:17] and also the cost of one or two new trees, [46:20] depending upon what they deem fit. [46:22] So the tree replacement will be a separate contract that [46:24] will probably come forward this winter [46:26] and will plant trees in the spring [46:27] after they've all been removed. [46:29] So the remainder could go if the nature center doesn't [46:33] take all of them, the remainder could go to our city dump area. [46:37] OK thank you. [46:38] Which will burn and turn into our own biochar. [46:43] Any other questions. [46:45] [46:47] Mayor Spooner. [46:48] I make a motion to approve resolution 2020 6-272. [46:54] Second Motion by Barnes. [46:57] Second by Anderson. [46:58] All those in favor of resolution 2026 772. [47:01] Signify by saying all opposed. [47:04] Our sponsors. [47:06] Item 10. [47:07] Boards commission reports. [47:09] Announcements anybody got anything. [47:12] Just a reminder that tomorrow night is our September [47:16] council chat at Central Park. [47:18] We're going to have quite a few of our departments there [47:20] who will be able to just talk about anything that people [47:24] might have a question. [47:25] There is no formal presentation or anything. [47:27] It's really going to be a come and chat and ask any questions [47:31] to a staff member or to our elected officials who [47:33] will be there. [47:34] I have a work obligation, I will not. [47:38] It's at 5:00 PM. [47:39] Correct Yes. [47:40] Thank you. [47:40] 5:00 PM Yes All right. [47:45] At this time, I'll entertain a motion to adjourn. [47:47] So moved. [47:48] Second Motion by Ross. [47:49] Second by Anderson. [47:51] All those in favor, signify by Barnes. [47:53] Barnes I can't hear very well tonight. [47:55] It's the girl voice by Ross. [47:57] Say goodbye. [47:58] Barnes we're going to have to start raising hands. [48:00] All those in favor, signify by saying Aye. [48:01] Aye [48:02]