[0:00] All right, we are back. Most of you didn't know we were here [0:04] yesterday. We are back. Um, and I'm going to call [0:09] to order Ford County Commission meeting for September 8th, 2026. This is meeting [0:13] number 2026-33. [0:16] Uh, as usual, we will begin with a prayer and a pledge of allegiance. [0:20] Today, we are led by Pastor Margarite Frell. [0:28] Lord Jesus, Lord, we thank you for the opportunity to be here. Lord, we thank [0:31] you for each one here today, Lord. Lord, we stand in the need. Lord, bless this [0:34] meeting to be what you have it to be, Lord. In the name of Jesus, Lord, in [0:38] Jesus name. Amen. >> Amen. [0:43] To the flag of the United States of America and to the republic for it [0:48] stands, one nation under God, indivisible, with liberty and justice [0:53] for all. Thank you very much. [0:56] » Yes. [1:02] » Okay. We will move to our consent agenda. We have meeting minutes for [1:08] meeting 2026-30 and meeting 2026-31. [1:15] Uh we also have our credit card statements. [1:22] And I make a motion to approve the consent agenda. [1:26] » I'll second that. >> We have a motion and a second. Any [1:30] further discussion? [1:34] » All those in favor? >> I. [1:39] » Okay. We have approval for claims for payment uh totaling 2,531,1958. [1:50] » Mr. Mr. Chairman, I'd make a motion to approve the claims as presented. [1:55] » Second. >> With a motion and a second. Any further [1:59] discussion? >> All those in favor? [2:03] » I >> I [2:07] » Okay, we are to open public comment. Uh there will be a limit to five minutes [2:11] per individual and 15 minutes per topic. Final action may be deferred until the [2:16] next county commission meeting unless an emergency situation does exist. [2:22] The microphone is open. Feel free to come forward. [2:35] » Afternoon. >> Afternoon. [2:40] » My name Larry Howard. I moved to Fort County in 1975 with United Park Service [2:49] as a delivery driver who I stayed with for 37 years until I [2:55] retired. I have [3:00] never attended a commission. I really had no idea what you did except [3:08] for road development, you know, and bridge development, things [3:14] like that. And that's about as far as it went with me. I knew you were involved [3:18] in EMS shop, sheriff's office, [3:24] the expo, but I just never took you seriously ever [3:32] until, you know, the situation has come up with the death and [3:38] all this. And then I became aware that you involved a lot more than I ever [3:43] anticipated. And [3:48] My immediate area of concern is the transparency [3:55] of Ford County Commission to his constituents [3:59] by having meetings on a weekday, middle of the afternoon [4:05] where the general public generally excluded [4:09] their work. Whereas city commission is extremely [4:14] transparent and encourages public participation. It [4:19] seems that you all just by [4:25] the time setting up your meetings discourage public [4:31] being involved with what you're doing and it just raised questions in my mind [4:39] as to why it's set that way. I have asked several [4:44] people and they said, "Oh, it's been that way as long as I can remember." [4:47] Well, still it seems like you're excluding the [4:53] public from your activities and you don't advertise. you know, [5:00] state your positions to general public as far as the data [5:06] centers, the battery storage and all that [5:12] until the last few weeks when all this came up [5:17] and people started speaking out. 95% of the entire county had no idea [5:25] that data centers were even an issue in Ford County until we found out. I guess [5:32] there's already one in North Ford and there's one already being developed [5:38] around Spearville and apparently there's another one being [5:43] considered for county and I just wondered why. [5:51] Nobody seems to know. It just seems like [5:58] you're not being transparent with us. And I think we [6:03] deserve that. [6:10] And that's basically what I came to say. I would like to see become more involved [6:17] with the citizens of For County. and inform them more what you're up to [6:27] instead of finding out through little blocks in the public notices in the [6:32] paper. And since we don't have reporters at the Globe to cover [6:38] or television station to cover like we used to. [6:44] Seems like you guys are sort of working in secrecy [6:48] and that concerns me. That's all I have to say. Okay. Can I [6:57] can I retort before you walk away? [7:06] » What's that? >> I just wanted to address a couple of [7:07] your things. >> Yes. [7:09] » Yeah, absolutely. [7:13] We we have been advertising. >> Yeah. [7:16] » Absolutely. As much as we possibly can on social [7:20] media. Uh we've had multiple open forums with attendance of 3 to 500 people. Um [7:30] beyond that I I don't know what what more you want us to do. [7:33] » Okay. Well, like I say, I've been very ignorant of everything and I only know [7:42] what I have seen and suspected. >> So, that's why I bring it up. [7:49] » I was going to I was going to address your comment about the day like the [7:53] timing of our meetings. Yesterday, we had a meeting and it's it's a day nobody [7:58] works, right? But we worked, right? because it's a it's a disclosed meeting [8:01] that was long time ago in in the works. We didn't realize it was going to fall [8:05] into a holiday, but we worked we had one person show up to our meeting. So, [8:09] there's not people that are coming in masses to attend these. Even the city [8:13] meeting that's at night only had like three people there in the audience. But [8:18] what I can tell you is when I first got on the commission, we met at 8:30 in the [8:21] morning. and we would meet to do business during the working business day [8:26] because the people that are in this room next to you are people that are actually [8:29] physically working on the clock. So, we tried getting the business done and [8:33] addressed by the 5:00 time frame. We moved it to the 3:30 in the afternoon, [8:37] 3:00 if there's a work session, maybe 2:00 2:30 [8:41] so that people that actually work within the county can still handle that work. [8:45] So, it's it's a workload thing. This is more of a active community county [8:51] facility if that makes sense. >> We go first. A lot of times the city's [8:55] in our meeting. A lot of times they come and they address us from various forms [8:59] of their departments. Whether it's the museum, whether it's why not dodge, [9:02] whether it's the city administrator, they'll actually be in the attendance [9:06] with us. So they'll ask us to go first. Then we actually make our motions. They [9:10] go second. So that's why theirs is later at night. Just like the community [9:14] college will come to our meetings. they'll we'll go first, they'll then go [9:17] after us. The school district does the exact same thing. So, it's kind of like [9:21] an honor system, if that makes sense. That's kind of how the the community [9:25] works together because if we all win at the exact same time, if you wanted to [9:28] address us and you want to address the city, it just it's too much. So, that's [9:32] that's where the timing kind of moved. >> Okay. Have you ever considered evening [9:38] meetings? >> We've had evening meetings. We we've [9:41] there are certain times of the year where we do different meetings, but we [9:44] have had evening meetings. >> Okay. [9:46] » Zoning board. We we have several groups that are in front of us too that give us [9:51] advice, give us um >> advisory boards. [9:55] » Advisory boards and and those meetings are at different times. So, we have to [10:00] we have to like jock. Ours is kind of the one that sets the tone of the rest [10:03] if that makes sense. >> Okay. I'll carry you forward. [10:08] » Yeah. I I think the public is misunderstanding that, but I also think [10:11] there's always been a big push for that. Um, and even when we've had meetings at [10:15] night or even yesterday when there is nobody working, we're still have having [10:20] a meeting. We have one person in attendance. [10:22] » So when you talk about social media, are you talking about Facebook or [10:29] what? Because I don't ever see anything. [10:35] » Okay. Yeah. So, you probably have to follow the Ford County [10:39] » Ford County >> Facebook page. [10:41] » Okay. >> Yeah, we Yeah, do that because we we all [10:46] meetings on there. Everything gets advertised on there. There's weather [10:49] alerts. There's >> everything. [10:51] » Um >> uh and if you'd ever like to come meet [10:54] in one-on-one, we we do that as well. Lots of times. We meet with public [10:59] groups. I met with a group of 15 people a couple weeks ago. I met with a group [11:04] of two people the other day. I've met one-on-one with a few along with our [11:08] county administrators. Um, again, we we try to be the accusation of lacking [11:13] transparency, I think, missed a little bit with this group, but we we try to do [11:17] the best that we can and >> but I don't mean to be throwing [11:22] accusations or anything. Like I said, I've just been an ignorant for county [11:28] resident 51 years. >> It's okay. [11:31] » Well, and Mr. Howard, if I could if I could ask a question and I ask it in um [11:40] in the spirit that I'd just like you to consider it. I don't need an answer to [11:43] it or anything like that, but um but we've we've sat on this side and [11:50] particularly now with with the data center issue that has really been [11:55] forefront. We've had a lot of a lot of very similar [12:00] accusations about you're not being transparent, you're not you're not [12:04] informing the public, you're not uh you're not doing everything that needs [12:09] to be done so that all of us are are informed and [12:14] and to your point where you said, you know, you've really not been very [12:18] involved for 51 years that you've been here. [12:22] At what point is it that the public is responsible to [12:28] find the information they want? Okay. And that's that's something that I've [12:34] tried to tried to address during this too is it's we as a commission or we as [12:42] individual commissioners cannot come and feed the public with a [12:46] fire hose about all the information that we have in order to make sure that [12:50] everybody's informed. It's there there is a certain responsibility of the [12:55] public to come and seek the information that they want. So that there's there's [13:01] a point where we need to be able to get together and and that transfer of ideas [13:06] and that transfer of information happens and there's responsibilities on both [13:10] sides of that equation. So >> Oh, one other thing I've heard about [13:16] these data centers is that there's a nondisclosure [13:20] agreement you and the developer is that something [13:25] » that's inaccurate. I have not signed any non-disclosure agreements. Okay, all my [13:30] questions are answered. >> Thank you. [13:34] » If you if you do want more information, feel free to email and and we can set up [13:39] any appointment here. You can come in the offices and and we can sit down and [13:42] talk. >> I've got a list of all your emails now [13:45] on my phone. So, >> well, I would even encourage going on [13:48] the for county website. You can get signed up to where you'll get all of our [13:52] information of every agenda coming to you. So you can see if there's something [13:55] on there that you would like to participate in and maybe come listen. I [13:59] mean that's that's blasted out to I don't know how many people you send that [14:02] to a week. >> Yeah. 200 something. [14:05] » Yeah. So I mean that's just something the clerk sends out. Yeah. I mean that's [14:09] a lot of the reoccurring people throughout the year that we see. [14:12] » How do I do that? >> Just send me something in writing. You [14:15] can email me. Say you would like to receive the agendas. [14:18] » Yeah. >> Okay. You have the clerk's here to help. [14:21] I know our administration team, Ben's right behind you, getting ready to write [14:24] something down. Tanda will definitely help you out as well. I mean, we we [14:29] don't want to exclude anybody in the public that wants to know. [14:32] » We want you to know. >> Truly appreciate. [14:35] » Yeah. >> Thank you. Appreciate it. [14:39] » Thank you, sir. [14:43] Boy, that was tough. [14:50] » Okay. Anybody else? >> Okay. Thank you. [14:59] » All right. We will move on to legal counsel. [15:10] » Good afternoon. >> Welcome. [15:14] Okay, we have we have a quick view. Uh, a couple of [15:20] things. Um, Angela is the Port County Health [15:25] Officer. She appointed by the commissioner to be the Port County [15:31] Health Officer. And [15:35] to do that, she must have a medical doctor or dentist who is supporting her [15:41] and consult with her and you can list all the different things [15:47] they do. [15:53] » Basically, it's pretty much the foundation of all of our operations from [15:58] client services, hands on to billing for services. [16:03] Just as a nutshell, >> so we learned over the weekend that we [16:08] or late last week that we have an opening as far as the consult [16:13] for county health officer. So here today to propose [16:18] uh entering into an agreement with Dr. Cody [16:22] to serve as consultant to the county health officer. So you have [16:28] before you a consulting agreement with Dr. [16:32] and also a resolution which is 2026 27. [16:52] We apologize for adding so late in the game, but we learned this weekend [17:00] function. We really need to have a consulting person. [17:09] » Who was our previous consultant manager? >> That's what I was thinking. So, okay. [17:17] » Do you have any questions? >> Have you had a dentist before? I have [17:22] not >> I just really learned about that. I [17:26] didn't even realize that it's an option. >> Yeah. [17:32] » 100,000 doctor [17:40] » that I'm aware of. >> Yeah. [17:44] » Dr. Early is >> she's an MD with family practice. [17:51] Okay. Not a dentist. >> Okay. [17:58] And [18:02] » Mr. Chairman, I'm sorry. I will let you say what you say. [18:07] » Mr. Chairman, I would make a motion to approve the agreement [18:12] and adopt resolution 2026 27 as presented. [18:17] » I will second that. And with the motion a second. Any further discussion? [18:23] All those in favor? I >> I [18:27] with regard to consulting agreement. We need to have consulting agreement. [18:33] You'll see in there [18:37] going to be paid Dr. That's a that's a math that's been there for a long time [18:41] and probably something that we're going to need to revisit with her [18:46] in the near future to make it more. >> Yeah. [18:54] » Is this uh something that renews annually or [18:59] » it it stays in place but either party can terminate for 30 days. [19:04] » Okay. I didn't know if there was a a regular term that that we would be [19:10] coming to the end of where we can readress that. [19:13] » Not with this. >> Okay. Is this something we do at budget [19:16] time or is this just something that does this come out of your budget? I assume. [19:20] Yeah. >> And I I do work with it at budget time, [19:23] but I don't know that I'm going to have that luxury with the circumstance. Okay. [19:28] To wait until that. [19:32] » Have you been using her to date? like if you leaned on her. [19:35] » Yeah. >> Um this just today. [19:37] » Okay. >> Just started. [19:46] » Everything just kind of transpired Friday afternoon. Okay. Right now. So, [19:50] » okay. [19:54] » Is is this something you'll bring back to us for a budget item? Is that [19:59] » Yes. >> Or is it just change? [20:00] » We just haven't had an opportunity to really visit [20:04] expressed. >> This was emergency. Get somebody in [20:07] place so we can operate. [20:16] » Okay. >> And and all the duties and I I'll go [20:19] through everything. We just have not had the time to sit down and do that yet, [20:24] but we will. >> Okay. [20:32] » Appreciate it. Thank you. [20:40] » You're up next. >> Yeah. [20:43] » We will take it to our county administrator's report. [20:45] » Thank you, Mr. Chairman. >> Good afternoon. [20:49] » Welcome. >> Thank you. Um I come before you um right [20:53] now to see to seek approval to purchase flu vaccine [21:00] for this upcoming year. Not to exceed $40,000 in total. There will be [21:06] different manufacturers that we were purchased from, but the the whole to [21:13] all of it will not exceed 30,000. >> Angela, [21:16] » yep. >> Would you tap that um [21:20] button on the other side? >> Yeah. I didn't I see people out here [21:24] straining to hear what you're saying and I'm don't think we're on. I think so. [21:33] Is that better? >> I don't think the light is on. [21:38] » Oh, the light's green. >> The light. [21:39] » Oh, there it is. Okay. >> Thank you. Sorry about that. [21:43] » Sorry. >> Oh, yeah. I can hear you. [21:46] » I think Are we okay? >> All right. First. [21:49] » Okay. Yes. Second. I'm out here. I would like permission to purchase flu vaccine [21:55] for this coming flu season not to exceed $40,000 [22:01] and we will be purchasing from various manufacturers a few of them but the [22:06] total and all the purchases will not exceed the $40,000 [22:16] and that would include all of our highdose flu vaccine for 65 five and [22:22] older flu mist for the ones who don't tolerate the injection and you know the [22:27] injection. So, [22:30] Mr. Chairman, I'd make a motion to approve the purchase of the flu vaccine [22:34] for the 2026 season. [22:42] I'll second with a motion and a second. Any further [22:46] discussion? [22:50] All those in favor? >> I. [22:53] » Thank you. >> Yeah. Thank you, Andrew. [22:56] » Next up, we have IT Director Matthew. [23:05] » Hey, gentlemen. Uh we are at the uh at the time frame to [23:11] do another network replacement. Um right now the uh item before you guys is going [23:18] to be a refreshing of our existing firewalls that we have in place. Um this [23:23] is a item that is uh it's covered under the NASPO contract with [23:29] Cisco in the state of Kansas. Um and with HPS being our primary provider for [23:36] all of our networking equipment. Um this will replace the u the items the the [23:40] primary firewalls and our secondary firewalls for our KDI connections. Um [23:47] the total amount with the service fees and for the project setup is going to be [23:52] $32,719.81. [23:56] Um this is under my capital improvement budgeting right now. [24:13] Mr. Chairman, I make a motion to approve the upgrade in invoices presented. [24:18] I'll second that [24:22] with a motion and a second. Any further discussion? [24:29] » All those in favor? I >> Thank you, gentlemen. [24:32] » Thank you. [24:35] Next two items will be for county clerk Debbie Cox. First topic will be uh [24:39] outdated ballot disposal. Second one in regards to camp. [24:44] » Gentlemen, I am requesting that you approve us to destroy the ballots for [24:49] the November 24 election and the November 25 election. By statute, we [24:54] keep the evenar balance, which is the 24 ballots for 22 months, the odd year, [25:00] which is a city and county or local city elections for 6 months. So, it is time [25:05] to distort both of those. Um, and I request that you appoint Nicole Nagel, [25:11] Republican, and Wayen Falls, Democrat, to witness the procedure. [25:22] » Mr. Mr. Chairman, I'd make a motion to approve the request for the outdated [25:26] ballot disposal of years 2024 and 2025 general election ballots and the [25:31] appointment of Nicole Nagel and Wayen Boltz as witnesses to the process. [25:43] I will second with a motion and a second. Any further [25:47] discussion? All those in favor? I [25:54] » the second one is setting the date for the canvas of the November election. Um [25:59] I am asking either um Tuesday, November 10th or Thursday, November 12th. We are [26:05] closed on November 11th for Veterans Day. Um and it will have to be in the [26:11] morning. The hours are stated in in the statute. [26:18] » You said 12th or 13th. um the 10th or the 12th. [26:23] » I'm sorry. >> Tuesday the 10th or Thursday the 12th. [26:26] We do have to audit before and that has to be once we audit the state has to [26:30] approve our audit before we can have a campus and we'll be auditing that [26:34] Thursday before the state time. I think I can make you hear those word. [26:39] » Sam, [26:44] you got any credits? Tuition >> Tuesday or Wednesday? [26:50] » Tuesday or Thursday? >> Tuesday or Thursday? I'm sorry. [26:52] » No, Wednesday. We're closed. [26:58] » I think Thursday. [27:04] And is there a time you said you need to make? [27:06] » It has to be before I believe 10:30 in the morning. So 9:00. Does that work for [27:12] you? >> Yeah. [27:17] » What was the time? I'm sorry. >> 9:00. [27:22] » So, Mr. Chairman, I'd make a motion to set the date for the canvas the votes of [27:27] the November 3rd election as Thursday, November 12th at 9:00 a.m. [27:35] Second with motion and second. Any further [27:38] discussion? [27:41] » All those in favor? I >> thank you. [27:48] » Okay, next up we have HR director Vanessa. [27:58] Good afternoon. [28:01] » Um, so in 2023, Ford County invested approximately 45,000 to participate in [28:08] the legend paro captive stock loss program formally administered through. [28:15] Uh, now that the county has exited the program, it's eligible to receive the [28:19] return of its investment. So the agreement uh that you have before you [28:24] authorizes us to receive those funds and the agreement has been reviewed and [28:30] approved by legal counsel. [28:44] » Mr. Chairman, I'll make a motion to approve the agreement and refund as [28:48] presented. I'll second that [28:56] » with a motion and a second. Any further discussion? [29:01] » All those in favor? >> I I [29:05] » Thank you. >> Thank you. Thank you. [29:09] » Next two items will be for Santa Fe Trail Director. [29:15] » Welcome. So, um, as you're aware, we are fully [29:20] funded with grants through the Department of Corrections. Um, so we [29:24] work on a fiscal year instead of a calendar year. So, because our budgets [29:28] already been submitted for FY27 due to the pay adjustments with the [29:36] pay plan, um, we needed to do an overall budget revision for both our adult [29:41] services and our juvenile services. So I sent those to you as well along [29:49] with a summary on the changes by our advisor. [29:56] So we come before five counties in our district that [30:12] they probably wouldn't take it too well table. [30:19] I'm just trying to see the font. >> I know. I'm sorry. [30:24] » Without embarrassing myself. >> You want blue better? [30:28] » No. Size. >> Yeah. I'm not going to bring out my [30:33] phone and zoom in in front of all you people. [30:38] » This ruler got a magnifying glass on it. [30:47] Yeah. [31:04] » Can you give us the highlight of what the difference was? So just because of [31:09] the increase in wages for staff um it resulted in approximately 21,000 [31:19] of an increase on the juvenile side and about 20,000 on the adult side. So, we [31:25] just had to make some adjustments and some other line items in our budget to [31:32] accommodate the increase in our salaries and benefits line item. [31:46] » Mr. Chairman, I make a motion to approve the revised budget as presented. [31:54] I'll second that. [31:57] » Both or just adult? >> It's just a [32:02] » Yeah. Oh, yeah. I just >> two separate [32:07] » with a motion and a second. Any further discussion? [32:12] When you when you readjust it, are you taking a hit anywhere important? Super [32:18] important. >> Nothing that we can't manage. [32:24] All right, we'll take it to vote. All those in favor? I [32:30] » Mr. Chairman, I'd make a motion to approve the revised budget for the [32:33] juvenile services as presented. >> I'll second that one, too. [32:40] » With a motion and a second. Any further discussion? [32:44] All those in favor? I >> Thank you. Thank you, Sha. [32:54] Next up we have John Hobby. [33:06] » I'm sorry you lurking back there. >> Yeah, hide in the back. [33:09] » You brought people with you. >> I did. [33:11] » You're not bringing them up. [33:19] » Look at this. Look at this. [33:22] » She's being confident. [33:28] » Love it. >> On we grow. [33:32] » This is Maline. She's in our office. >> She's been working on designing the 113 [33:38] road foundation project going north of Highway 50, which is talking about this [33:43] before. Uh we did a field chair review of the preliminary plans today. question [33:47] came up see the road in person and build the plans with rope bridge and myself [33:53] look at some of the details of the project and talk about [33:57] those details the budget based on current construction dollars our [34:01] budget's looking good we're still going to be depending on bid looking within [34:05] that $3 million range that we talked about for cost um so we'll look finalize [34:11] those plans here in the next two to three months and put out the bids this [34:14] winter for construction in 2027. Go ahead with that project. [34:21] Uh we are intending to like I did on Juul Road close the road during this [34:26] process. We're going to rip up the entire road. Uh I thought it would work [34:29] pretty well um on Juul Road. Somebody else remember differently to close one [34:34] mile at a time and just kind of advance it the enclosure. Uh it's been three [34:38] miles in this case uh from Highway 50 to Garnett Road. So, we'll start at Highway [34:44] 50 and close off that first mile. Tell the contractor they still have to allow [34:49] access. We know there is a business right there on Highway 50 and there are [34:52] a couple homes going north. >> Yeah. [34:54] » So, they'll have to provide access. >> And is that business expanding? [34:58] » I'm not sure about it, but it looks like they're working on [35:02] » Last thing we heard was they're adding on to the parking lot in the back to add [35:05] more trucks. >> So, that might be something to think [35:08] about as you bring that access forward. >> Yeah, for me. Uh so one thing we talked [35:12] about is uh the road is in pretty poor condition right up the edge of highway. [35:18] Uh and with the reclaiming it that process is kind of a train of equipment [35:24] which is not going to be real great to be one on the highway. So we actually [35:26] talk about reconstructing say like the first 250 ft [35:31] » from the highway north. So we don't have all that reclaiming equipment on the [35:35] highway itself. So we would tear everything down and build more [35:39] traditionally just the first 250 or so feet and then reclaim from there on just [35:45] that way next time we have to have equipment out on the highway reclaim [35:48] your machine and your packing equipment that kind of stuff [35:54] reclaimed rehab reclaim where you have your your cement you have the water [35:57] truck and it's it's kind of long train of equipment right there and they [36:01] usually want to start and go north from from the beginning. [36:05] So that be a little bit of a reition to the plans they have now. Shouldn't [36:10] really change the cost, but it'll just be [36:12] » staging. >> More like staging. [36:15] » Yeah. It's kind of a phase one, phase two, but I think it be safer to not have [36:20] much power on the highway. >> Yeah. [36:22] » Super busy high back. [36:26] » Is that Is that Would you normally start on the north and work your way south? [36:30] » Well, you could do it either way. Um, I think in this case we set the project up [36:35] to go south to north up to the garnet road. [36:38] » Okay, >> but if you come the other way around [36:40] either way, you're going to have to bring that equipment across the highway [36:43] one way or the other starting there or finishing anyway. [36:46] » Okay, >> it's pretty slow moving stuff. [36:52] So, we will look to bid that project like I said this winter around November, [36:56] December and start construction in the summer of 2027. [37:02] Um, next month I've been planning to bring an engineering design agreement on [37:07] the the first two segments of the cap improvement list that we developed over [37:12] the last couple of months. I have listed there. There's two segments. There's [37:16] actually two groups I should say of segments. Five different segments all [37:20] together. The first group was 132 road from Garnet to Juel and then 132 road [37:27] from Red to Primrose. to reclaim existing asphalt roads on [37:32] both those and put them back to asphalt again. And then the second group which [37:37] we may end up wanting to split into two different groups itself just because of [37:41] cost would be 110 road from Garnett to Denim and then 126 road from Garnett up [37:49] to the town of Spearville and 126 road down Highway 400. [37:56] go down by the feed lot makes it west. [38:03] So the five segments combined are pretty sizable cost [38:09] budget year wise if you do do it with two groups we made that second group. [38:17] So they're looking at 2028, 2029, possibly 2030, [38:22] three years, three, four years out. [38:28] Couple updates on active projects. Pioneer Creek wind. The only update is [38:33] things are sort of just going like gate busters out there building turppins. The [38:38] contractors are working on the electrical substation and the electrical [38:42] switch yard. Pretty much all passes of the tower. Construction is still [38:46] underway. They're still actively working on the [38:50] operation maintenance facility [38:54] on Marshall Road. It's still projecting construction to be complet by the first [38:59] of the year. Way I understand foundations. Their goal [39:03] was to have the concrete foundations done like in October. So that concluded [39:09] a lot of the dirt work for building street roads to those turbines as well [39:13] as the concrete trucks running down the roads to [39:17] concrete foundations. That would eliminate quite a lot of traffic. [39:27] Um active projects going down the bottom on the first page of my list. bridge off [39:32] system 101 which was the three span concrete bridge [39:36] that we're replacing with a single span steel beam construction of the bridge [39:40] the new bridge itself is complete. Uh the surveyors were out there staking [39:46] the road alignment today and our contractor supposed to be moving in [39:50] within the next day or two to start doing the final dirt grading building up [39:54] the road bed and grading the ditches. Installation of the guardrail on the [40:00] bridge will be completed right after that and then finally seating grass [40:05] seating and control its right after that. So the project contractor right [40:09] now is anticipating be 100% done by the end of next week. [40:14] things moving along there [40:21] off to bridge 31 which is the bridge of Duck Creek on low 14 road northeast of D [40:27] City. We are planning to put in a cost share application to KOT and those [40:33] applications are due in about two weeks. is working on getting that application [40:37] put together and get turned in. See if we can get some additional funding from [40:40] outside the county to help with that project. [40:45] Depending on the outcome of that, the county can choose to go ahead if if they [40:50] do get the cost share with the cost share or choose to hold off and try to [40:55] get cost share money in the future. Um FAS bridge 220. This is the deck [41:02] repair on the Coronado Bridge. Uh they're on 117 road south of 400. So the [41:08] contractor has finished patching the west half of the bridge or they will [41:13] finish this week and then we intend to switch traffic so they can start on the [41:18] east side of the bridge right after that presumably next week. Once they finish [41:23] passing both sides they intend to apply the sealant. So we're looking at [41:27] probably early November or something like that for application of the [41:32] sealant. Uh so the commissioners do know that once we talked about this before we [41:37] start tap hammering on bridge that's got deteriorated concrete that vibration can [41:42] loosen up things that we thought were solid and that seemed to be the case [41:45] that we ended up having to do more patching on that first side than [41:49] anticipated. If the second aside turns out the same [41:54] way that potentially about an $80,000 overrun for the project [42:00] says that the funding is can handle that overrun if that's the [42:04] way it goes. We're optimistic that the east side does not look to be as detered [42:09] as bad. So the overrun percentage wise hope would be less on the east side than [42:14] the first half. We'll just have to see out there. This bridge hasn't been [42:19] rehabed since its original construction. So, I said once they started jackhammer, [42:25] we have been loosening things up for summer. [42:29] Things are tracking along. So, project completion should be around [42:33] Thanksgiving. So, that time frame. [42:41] Next thing I had on my list down here towards the bottom of this solar forge [42:47] data center planning and zoning district noting that had authorized construction [42:53] of the data hole data that they that's the building from the data center [42:58] itself. There's a second building that they're calling the administrator [43:01] building plans for that is coming in the near [43:06] future they tell us. We don't have a solid date of solid construction at this [43:10] time of the project [43:15] safe streets and roads for all project. The county all five of the counties I [43:20] should say had involvement project hosting public meetings about a month [43:25] ago. We also had a website set up so people [43:29] could put in their uh comments through the website related on the road networks [43:35] of the counties. I'm not sure if that website's still open or not. I mean, [43:39] it's probably shut down by now. I do apologies. [43:46] But the goal is then to have the final plan, safety action plan completed by [43:50] the end of the year. And the goal of that is to identify areas of [43:55] improvement. said when hopefully Congress enacts another highway [44:01] transportation bill 20 billion 50th anniversary [44:09] that include construction dollars for constructing those projects that [44:14] typically take the plan and use that to apply for construction in the future. [44:19] Congress passes that bill. [44:24] Congress is saying that they do intend to pass a bill that will include safe [44:27] streets for all some plan pass. >> Do you probably don't know this, but off [44:34] the top of your head, do you know how many submissions that they got through [44:36] that website total? >> I do not. [44:39] » 500,000. >> I was [44:44] perfect. >> No, that's a good question. I'll ask [44:47] that question. Just curious what kind of traffic it [44:53] generated with five counties involved. [45:06] And I would anticipate that information to be in the report. So they ought to [45:10] have that information. [45:14] The railroad crossing across Gardet is another one that we actively pursuing [45:20] that got anything back from Ka since middle of July. They said they were [45:24] working with the railroad to get that project going again. They were checking [45:29] with the railroad to see if they were going to do on-site meeting and I not [45:33] heard anything back since that time. reaching out to them [45:39] typically moves at a pretty slow pace after 60 days. Not too long yet [45:47] to go 90 days without asking a police see where we're at. [45:51] » Joan, you'll understand. I got four months left here. This [45:57] project is important to me and [46:02] time, I guess, is of the essence for me. So, [46:04] » I understand completely. I will at least restart [46:10] the next meeting. >> That crossing is west of Spiritville, [46:13] not east. [46:21] » I want to make sure we get this done on the right crossing. [46:30] It's all on the map. We got the right [46:35] Uh the last item I have is to that's a new business item. The county bridge [46:40] inspections that are required by federal highway every two years will be due in [46:45] February. Uh so again on the October 5th meeting of county management agreement [46:50] to perform the bridge inspection as the past [46:56] in the past we've included cities in the same agreement [47:00] and then the city reimburses the county for the cost of getting the bridge [47:03] inspections done just provides efficiency and helps keep the cost [47:07] affordable for both sides to buy them together [47:11] bridge they're okay with doing it that way I'll reach out to the city injury [47:14] staff and they'll check with still on board with that [47:19] case then I'll bring that agreement to October 15 [47:36] where you go to school now >> I graduated back [47:41] » okay what made you pick Kirk and Michael all the way over to Ellsworth [47:46] One of my goals when I graduate [47:59] » team's been pretty welcoming. >> Yeah. [48:08] » Nice. >> Did a great job. [48:10] » Yeah. >> So, kind of in engineering is sort of [48:12] like the medical field. Once you graduate, you're an intern, okay? [48:15] » So to speak, until you're able to get licensed. So we have summer interns who [48:20] are still at school and then we have engineering interns or at least in [48:24] training. Now we call them engineering interns. [48:28] Once she passes her professional exam and get at least four years of [48:32] experience, she can become a licensed professional this year. [48:36] » Okay. >> It's a minimum four year process. [48:42] Nice neat she's been able to come out and join us the field review and the [48:45] plans she's been working on. >> Yeah. [48:48] » Thank you for coming out. >> Good to have you. [48:50] » Stuck her head into see condition. >> Anything scary in there? [48:56] » Nope. >> No snakes, no possum. [48:59] » You didn't scream once. >> Scream. We saw birds. We saw cats. We [49:03] saw bunnies. >> Nice. [49:08] » Yep. [49:13] It's great. >> Hey, thank you, gentlemen. [49:15] » Yeah, appreciate it. Thank you. See you in October. [49:17] » Looking forward to it. >> Bring cooler weather with you. [49:24] » It's 107 out there. [49:30] » All right. Upcoming meetings. Our next border county commission meeting will be [49:33] on Monday, September 21st at 3:30. The KPG annual meeting will be September [49:38] 17th and 18th at the casino here in Dodge. I know Chairman Thomas will be [49:44] speaking on the 17th. I believe uh Commissioner Boy will be on the panel. [49:50] Um Commissioner Tacid is on the board. So we will have [49:54] have presence from all commissioners at that event. Uh KAC annual conference [49:59] will be December 8th through the 10th in Witchah. And that concludes our report. [50:04] » Thank you. Gentlemen, thank you for stepping up [50:08] doing the welcome there on on Thursday, chairman and [50:12] » and panel there. >> Y [50:16] thank me out the county good. >> The county has been a member of that [50:21] group since its inception. I think that's been over 30 years ago. So, um, [50:27] as far as a as far as a lobbying group for the county in the state, [50:35] I value that one probably more than any other that we've all [50:40] » Thank you. >> Good to have something local. [50:48] All right, with that, we've got a few executive sessions to step into [50:54] here. So, we will kick off the first one here. Um, [50:59] we are going to step into executive session with attorney client privilege [51:02] exception of the Kansas Open Meetings Act. Uh, I move the board recess into [51:06] executive session to discuss a pending appeal before the board of tax appeals [51:11] pursuant to the attorney client privilege exception of the Kansas Open [51:14] Meetings Act, KSA 75-4319B2. [51:20] The open meeting to resume at this location at [51:26] » we will go 4:30 p.m. [51:32] » I got 4:22. I've given people a minute to get out and then your seven minutes. [51:37] Uh in addition to the commissioners, the interim county administrator, uh [51:41] assistant county administrator, the county appraiser, county counselor, [51:46] assistant county counselor, uh should be included in the executive session. [51:50] » I have a second >> with a motion and a second. Any further [51:52] discussion? All those in favor? I [51:56] » I [52:00] » Okay, we will commence the meeting. Um, I would like to make a motion to [52:12] award >> hire [52:15] » hire uh Keller Craig and Associates um to provide appraisal services on do we [52:22] need specific property? >> Southerntherlands [52:26] » on Southerntherlands at 1510 Soul Street. um not to exceed. [52:34] » We prefer you not put that in there because it's a it's a sliding scale [52:37] depending upon what we ask to do. >> Okay. [52:44] » So, just prove this. We have an engagement agreement. Okay. [52:57] » Okay. Make a motion to hire Keller Craig and [53:00] Associates uh to provide appraisal services for Southerntherlands at 1510 [53:05] Soul Street, Dodge City, Kansas 67801. [53:11] » Second with a motion and a second. Any further [53:15] discussion? [53:18] All those in favor? >> I I [53:23] Okay, now we will step back into executive session. Uh, attorney client [53:28] privilege exception to the Kansas Open Meetings Act. Uh, I move the board [53:33] recess into executive session to discuss personnel and operational concerns [53:37] within a Ford County Department pursuant to the attorney client privilege and the [53:41] personnel matters of non-elected personnel exceptions to the Kansas Open [53:44] Meetings Act KSA75-4319B1 [53:50] and two. the open meeting to resume at this location. [53:59] » Okay, we will go for 4:46 p.m. [54:07] In addition to the commissioners, the interim county administrator, assistant [54:10] county administrator, human resources director, county counselor, and [54:13] assistant county counselor should be included in the executive session. [54:18] » Second with a motion and a second. Any further discussion? [54:22] All those in favor? >> I I [54:26] will see. >> Okay, we are uh back from executive [54:31] session. No action will be taken uh from the last executive session, although we [54:34] are going to step into a third and final executive session. Uh attorney client [54:39] privilege exception to the Kansas Open Meetings Act. I move the board into [54:42] recess into executive session to discuss zoning board processes and procedures [54:46] pertu pursuant to the attorney client privilege exception to the Kansas open [54:50] meetings act KSA75-4319B1 [54:55] and2 the open meeting to resume at this location at 501 [55:02] p.m. In addition to the commissioners, the interim county administrator, uh, [55:06] assistant county administrator, the planning and zoning director, county [55:09] counsel, and assistant county counselor should be included in the executive [55:11] session. >> Second. [55:13] » With a motion, a second. Any further discussion? [55:17] All those in favor? >> I [55:20] will not take any action coming out of uh our executive session and all that is [55:26] left is adjournment. So, I will make a motion to adjurnn. [55:31] Second >> with a motion and a second. Any further [55:33] discussion? All those in favor?