[This transcript was generated automatically from audio using AI and hasn't been reviewed by a person -- it can contain mistakes, including plausible-sounding sentences that were never actually said. Treat it as a starting point, not a verbatim record.] [0:02] All right. Hello, everyone. Thank you all for coming in tonight. My name is Ryan [0:06] Ossenton. I'm the project manager from the Public Works division here at the city. [0:11] A couple of administrative people that are here just to point them out to you. We [0:15] have Rachelle Bedell. Hi, Rachelle. We have John Dowdy, who's our director of [0:18] Public Works, and our new city administrator, Matt Morley. This is [0:22] Matt's first month on the job. He's on week three, I think, so I'm glad he [0:27] was able to find council chambers and be here on time. [0:31] So we did a couple of introductions real quick. [0:34] So tonight's meeting, just so you all know, tonight's meeting is being recorded. [0:38] It's not being broadcast live, but it's being recorded and we'll be posting it on the city's [0:41] YouTube page by the end of the week. [0:43] If you want to go back, check it out or if you want to send it to anyone else to [0:46] review so they can see all the information. [0:48] We'll also be putting these slides up on our city website, city of Gilroy.org back [0:54] CCMP. Civic Center Master Plan, CCMP. All the information from the project is on there. [1:01] I am going to ask two favors of you. This is a semi-long presentation. I'm going to [1:06] talk for about 30, maybe 35 minutes. I'm going to ask that you hold all of your questions [1:11] until the end of it. The reason for that, a lot of what I say rolls into the next [1:15] slide and will answer most of your questions before we ask them. If you do have a question [1:20] that doesn't get answered by at the end of my presentation. When you come up and ask [1:26] your question, I bring you the mic to ask the question, please clearly state your first [1:29] and last name. The reason for that, we have to track all comments and questions around [1:34] the project and submit them to our partners. And we need to know the names of the people [1:40] that ask the questions so we can tie it back within the report if there's a follow-up [1:43] report. So I'm going to ask, if you have a question at the end, please clearly [1:47] state your first and last name before asking the question. [1:50] So this is our agenda for tonight. [1:54] We're going to run through, we have four areas to focus on. [1:57] The first one is the Civic Center master plan and the background and the why we have a [2:02] master plan. [2:03] The second point will be a review of our master plan and then we will review the draft [2:08] environmental impact report as well. [2:10] After those are done, we'll have a brief Q&A. [2:13] I might not have the answers to all of your questions. [2:16] So if I say I'm not sure it's not because I'm trying to avoid your question [2:20] It's because we haven't gotten to that point yet. This project is about a seven eight nine phase long project [2:27] And we are still in the beginning steps of phase one [2:30] So there's a lot of information that we just don't know yet because we haven't crossed that bridge [2:34] So if you have a question, we'll track it and I'll do my best to answer what we can [2:39] So what is the Civic Center Master Plan? [2:43] In short, it's a long-range planning document that helps guide the development and design [2:47] of our core public facilities and our civic campus. [2:51] Our civic campus is considered from Church Street to Doughty between 6th and 7th. [2:58] So to give you a visual of that, this is a Google view, aerial view of our campus. [3:04] So, you can see at the top of the screen, you have Church Street between 6th and 7th [3:08] all the way down to Doughty. [3:10] That area is considered the civic campus. [3:12] Within our campus, we have the senior center, the police station, the library, City Hall, [3:22] Wheeler Auditorium, and the Annex, which is the old police station, and we have our [3:28] surface level parking lots. [3:31] So, why do we need a master plan? [3:33] What is the point behind the development of a master plan? [3:36] A master plan is our guiding document for managing our Civic Center plaza. [3:42] All the decisions we make around, you know, how the parking is set up, what buildings [3:46] go where, what flagpoles go where, how you connect between the two buildings. [3:50] All of that is designed and decided within a master plan. [3:54] Our most recent master plan for our Civic Center was adopted in 2002. [3:59] So we're about 24 years into the current plan that we're on. [4:02] That previous plan gave us the library and the police station. [4:07] So just to give you some idea of how long it can take to develop buildings within that master plan. [4:13] Since 2002 when that plan was adopted, the population of Guillory has increased by 42%. [4:18] So we have seen a very large jump in the last 20 plus years within our community. [4:25] And a part of that, the issues behind that is much of our infrastructure is aging and rapidly outdating. [4:31] We are outgrowing it from a staff perspective and a lot of our buildings are in need of [4:37] major renovations or complete new construction to get us up to speed to where we need to [4:42] be. [4:43] So just to give you an idea of how old some of our campus is, Wheeler Auditorium [4:48] was built in the 1940s. [4:50] So it's pushing over 80 years of age for our recreational center. [4:56] city hall was built in the 1960s so it's over 60 years old and it has not [5:03] received hardly any renovation since it opened the senior center was built in [5:07] the 50s and it's gotten two renovations but the last one of those came in 2002 so [5:12] it's pushing 25 years without any updates and the annex which is our [5:16] former police headquarters was built in the 60s as well and it got one [5:19] renovation in 1986 just for reference I was born in 1989 so it's been a [5:25] minute there. So as a part of our process, in November of 2024, the City Council awarded [5:32] a contract to help develop our master plan to ELS, Urban Architecture and Design. And [5:40] in early 2025, City staff and ELS held some public forums. Some of you, anybody attend [5:47] any of those, show of hands? A good bunch of you, yeah. So we started in that process [5:52] us with kind of an idea of what we wanted to do. [5:55] And we used those meetings last March, April, and May in [5:59] your feedback to develop the plan that we're going to show [6:02] you guys today, and that most of you have probably reviewed [6:04] within the documents online. [6:07] So the feedback from those meetings led directly to [6:09] the development of the master plan that we are moving [6:12] forward with here. [6:15] So let's jump into that master plan. [6:17] Couple of things I want to touch on before [6:19] we dive into it. [6:20] Our police station was built in 2010, and it is not a part of the Civic Center Master Plan update. [6:27] We will not be doing any renovations or spending any money on the police station. [6:32] It will exist as it is under the new master plan that we are moving forward on. [6:36] The library is in the same situation. It was built in 2012, [6:40] so we will not be doing any updates to it as a part of the master plan. [6:43] However, we do have leftover bonds from when the library was built, [6:47] And we are in progress right now on some design renovations to the library. [6:53] And we are expecting construction to start on the library for those updates in the fall of 2026. [6:58] So we are headed towards it and I'm very excited for it. [7:02] It's going to be awesome what we end up doing over at the library. [7:06] So under our new plan, we would demolish four buildings within our footprint. [7:11] That would be City Hall, the Annex, Wheeler Auditorium, and Senior Center. [7:19] And those four buildings would be replaced with a new City Hall, a new multi-generational facility, [7:26] a recreational facility with an aquatic center, and a newly created Civic Park. [7:31] So let's jump into, this is a rendering of what the new master plan would look like. [7:37] So for reference, at the bottom of the screen, you have Church Street, the top of the screen [7:42] is Doughty Street. [7:46] This building at the top, that is the police station, again that one will remain unchanged, [7:50] that is its current location, that is where it will stay. [7:53] This is the library, same thing there. [7:56] No renovations to it, it will stay exactly where it is unchanged. [8:00] This would be the location for the new City Hall. [8:04] This would be our multi-generational facility. [8:07] This would be our Aquatics and Recreation Center, and then finally our new Civic Park. [8:14] So let's start with the Civic Park. [8:17] Our newly created Civic Park would be approximately the size of a football field. [8:22] So about 100 yards in length, about 53 yards wide, which is a very good size public park [8:29] in a place where we don't have public park in immediate walking access. [8:32] I think the closest is down by Brown L. [8:37] That's several blocks away. That's a long walk from here. [8:39] So this new civic park would create a new downtown area [8:43] that's in an immediate walking distance to Gourmet Alley [8:47] and the downtown area, which we are actively working to develop. [8:51] This would feature a shaded paseo for community events, [8:54] farmers markets, Saturday morning outings for groups. [8:58] It would have an outdoor walking loop, [9:00] an interactive water feature and dedicated bike parking. [9:03] We're also expecting it to, we're tracking, excuse me, [9:07] towards 425 available parking spots [9:09] with the ability to convert part of a surface lot [9:12] into a two to three story garage [9:15] that would match the aesthetic of the buildings [9:17] and the height of the buildings around it [9:19] and it would allow us to add up [9:21] to 180 additional parking spots, [9:23] which I'm not great at math, [9:25] but that's right around 600 spots. [9:27] So that would be a sizable increase compared to what we currently have. [9:31] So this is an illustrative site plan for the Paseo and the outdoor park. [9:38] So this is a reference just to show you the size of the football field park that we have. [9:44] It's a pretty good size green space in a downtown strip. [9:49] This would be your shaded Paseo, so it would serve as the walking connector path [9:54] from the police station to City Hall, City Hall to the library, City Hall to the [9:59] Aquatic Center. And it would create a nice outdoor shaded space for people to [10:04] come and enjoy the park and everything within our footprint. This is the [10:08] outdoor walking track that you can see here. It would be, I think they said [10:12] it's almost a half mile loop, so a couple of loops gets your steps in, [10:16] which would be nice. You have an interactive water feature here. This [10:19] would be something that would be like water spouts out of the ground, [10:23] on something for kids to play in on a hot day out [10:26] without having to actually jump in a pool. [10:28] And this is a example of the parking. [10:30] So does everybody see the number 224 right there? [10:34] That section of the parking lot directly beneath it, [10:37] those two sections would be the areas converted [10:38] into a garage if we go that route [10:40] to add the extra 180 stalls. [10:42] So that is where a parking garage would go. [10:45] All the rest would be surface level lots [10:47] and we would be adding street parking [10:49] pretty much to the entire perimeter [10:51] all the way from the corner at 6th and Doughty, all the way down 6th, all the way down church, [10:58] and all the way up 7th back to Doughty. [11:00] We would not be adding street parking on Doughty, though. [11:02] It would stay between 6th, 7th, and Church. [11:07] For our multi-generational facility, this would be the new home for the senior center. [11:11] It would also serve for a newly created auditorium and theater for the performing [11:16] arts with balcony seating. [11:18] We would have an updated dining facility with indoor-outdoor seating, a dedicated [11:23] They had half gymnasiums for activities, events, and parties. [11:26] Parks and Rec would receive new office space within this building. [11:29] It would also serve for a newly created teen center, as well as an art studio and an art [11:34] multi-purpose room. [11:36] We expect this building to be just over 41,600 square feet. [11:39] That's the estimation for right now. [11:42] So this is what that floor plan would look like. [11:46] This is an overlay of it. [11:47] But this would be our senior center with the lounge and dedicated activity room. [11:56] Down in the bottom left corner is our auditorium with auditorium style seating and an elevated [12:01] stage. [12:02] You have your indoor-outdoor multi-purpose dining room with a new commercial kitchen. [12:10] You have your dedicated half gym as well as the office space for the first floor. [12:18] On the second floor of the building, you would see the youth lounge and the youth activity [12:23] center as well as the art studio and the art multi-purpose room. [12:27] And then you have the balcony seating and your control booth control panel for the [12:31] performing arts center. [12:35] And this is a breakdown of the square footage. [12:37] I understand that it's hard to read. [12:38] If you want to look at it in a little more detail, just check out the PowerPoint when we [12:41] post it on the website so you can see that and look at it a little bit closer. [12:46] This is a rendering of what we would expect the exterior of the building to look like. [12:51] So a lot of glass, the aesthetic of it would match the existing aesthetic of the police [12:57] station and the library. [12:59] So if you're trying to think in your head of what it would look like, just picture [13:02] the library and then this layout, maybe a little bit bigger, that's what our multi [13:07] a generational facility would look like. [13:11] For our Recreations and Aquatic Center, [13:13] it would feature a dedicated lap and activity pool, [13:16] dedicated pool locker rooms. [13:19] You would have a full-size indoor basketball court [13:21] with the ability to host two full court games simultaneously. [13:25] You would have three multi-purpose rooms, [13:28] more parks and recreation office space, [13:30] a indoor weight room with dedicated fitness classrooms, [13:34] dedicated gym locker rooms, [13:36] and an indoor elevated walking track [13:38] that goes above the basketball court. [13:41] And this building would be 42,600 square feet. [13:45] That's our estimation there. [13:46] So this is what the floor plan would look like. [13:51] As you can see, that is where the lap pool [13:53] and all of the pool equipment would go. [13:56] And for reference, [13:58] if you keep going left of the pool, [14:00] you would run right into the library. [14:02] So where the pool is, [14:04] is where the parking lot currently exists [14:06] between Wheeler and the library. [14:08] That's a good reference point for you. [14:11] These would be the dedicated pool locker rooms, men's and women's locker rooms. [14:17] This is the first floor, so this is the gymnasium in the basketball court. [14:21] As you can see, you'd have full court options both north and south and east and west [14:26] if you needed multiple games going. [14:28] You would have dedicated multi-purpose rooms, staff office space. [14:33] And then on the second floor, you would have more staff off the space, another multi-purpose [14:39] room, so three total, two on the first floor, one on the second floor. [14:42] A dedicated fitness space, has anybody been to the Morgan Hill CRC before? [14:47] This gym would be almost the exact same square footage and layout of the Morgan Hill CRC, [14:51] so that's a good reference point if you've ever been over there. [14:54] A dedicated fitness classroom for spin classes and workout classes. [14:59] And then, then again, [15:00] Located gym locker rooms for men and women. This would be upstairs right next to where the [15:04] gymnasium or where the weight room would be located. And then your elevated indoor walking [15:09] track for the days where you need to get your steps in but it's raining and you can't like [15:13] last week. You can come here and walk on the elevated track. Or if you want to watch [15:17] a kid's basketball game but you can't sit still because you're a pacer like me, this [15:21] is a perfect spot to do that. And again, another breakout of the square footage. [15:27] This [15:28] This is what the exterior would look like. [15:31] The middle picture, item number three to the right here, that big black box with windows [15:39] looking out of it, that would be the weight room that looks over the pool and the Aquatic [15:44] Center. [15:48] And then for City Hall, we would have a new council chambers with the view of Civic [15:52] Park, an improved lobby with public counters for services, and dedicated office space [15:58] for city staff. [15:59] And we expect this to be about 47,500 square feet. [16:04] I have gotten this asked to me a couple of times. [16:07] If the staff number is not changing, why is the square footage of City Hall going up? [16:12] The reason behind that is we have staff that works for the city that doesn't work in City Hall. [16:18] In this new plan, almost all of our employees would be under City Hall. [16:21] So it helps bring our organization under one roof [16:26] without having to have multiple places that people are located throughout. [16:32] So this is what the layout of the new city hall would look like. [16:35] As you can see, this is where the council chambers and the lobby area would be. [16:40] The council chambers would have a view into the civic park from this angle. [16:45] These would be your public counter spaces to do your permits or ask questions, [16:50] pay your water bills, whatever it may be. We'd have dedicated public counters, as well [16:55] as private office staff area. Second floor is going to be the same thing. You have your [17:00] public counters and receptions area, and then more office. And that is a breakout of how [17:08] the square footage works out. [17:16] So what is an environmental impact report? The EIR is [17:20] a public document that is required under CEQA, which is the California Environmental [17:24] Mental Qualities Act, it's required to review your project and identify any potential items [17:31] that could create an impact on the surrounding environments, right? [17:37] So it tells you what it could cause and how can you reduce it. [17:45] ELS has partnered with EMC Planning Group to help produce our draft EIR. [17:49] So we worked with ELS to create the master plan and then EMC is reviewing it and creating [17:54] creating the impact report off of that. [17:56] So they highlighted items that could be impacted by the development of our master plan. [18:01] There's four topics that an item can fall into. [18:04] It's either no impact, less than significant impact, potentially significant impact, or [18:10] significant and unavoidable impact. [18:13] So those are the four areas that you could qualify for. [18:16] We had six that were no impact, ten that were less than significant, and one that [18:21] was significant and unavoidable. [18:23] Quick Jeopardy question, can anyone guess what the one significant and unavoidable item was? [18:29] No, it was Wheeler. [18:30] Yeah. Bingo. [18:35] So just an example of some of the things they identify. [18:40] Construction would create odors that adversely affect people. [18:44] Yes, that's what happens when you knock down buildings or building things, right? [18:48] There'd be no effect on wetlands or native fish or wildlife, things like that. [18:52] So they just go through the entire document and highlight anything they think could be [18:56] an issue. [18:57] So some of the less than significant impact items. [19:01] I'm not going to read all of these. [19:02] If you guys want to read them, I'll leave the slide up for a moment and you can read [19:05] through them. [19:05] But almost all of them are things such as potential adverse effect on special status [19:11] wildlife species because we're knocking down trees that would be within the footprint. [19:15] We can't clearly identify what specific birds live in, what specific trees. [19:20] So, there is a chance we could do something, but it would be minimal. [19:24] So those are some of the things that they've identified here. [19:26] They had 10 of those minimal items. [19:29] Really the main point of the EIR that we took from it was the significant and unavoidable [19:35] impact item, which would be the loss of Wheeler Auditorium. [19:38] And they have given us a clear path to going that route if we need to. [19:44] And that would be the proposed mitigation steps, which indicate that prior to issuing [19:49] any demolition permits. We would have a historian architecture. They would document Wheeler in [19:56] accordance with guidelines that have been established already by the Historic American [19:59] Building Survey. That's going to cover a couple of different items, but the main things would [20:04] be the drawing and floor plan sketches, photographs, extensive photographs. Like [20:12] you think it's a lot of photographs? Like double that. They're going to take pictures [20:15] of everything within that building and then all of the written data associated with Wheeler [20:20] from those 80 plus years that we've operated on it. [20:25] And then a historian would submit all those documents to the California Historical Resources [20:29] Information System, which is managed by the state, and they would log that along [20:33] with all the other buildings that existed in there. [20:37] So what do the next steps look like? [20:40] Our current focus right now is on developing and finalizing the master plan. [20:46] Once that gets finalized, we will take it in front of City Council, present it, [20:51] and they will vote to either reject it or formally adopt it as the plan that we will use [20:56] to manage the Civic Plaza moving forward. [20:59] So, when I said earlier that there's lots of phases to this, that is phase one, [21:04] have this plan get adopted. [21:06] Once that plan gets adopted, we will shift our focus into phase two, which is financing and phasing. [21:13] We don't have a solid idea of what it's going to cost. [21:17] We have rough order magnitude pricing, but we do not have detail because there's a lot of variables that go into it, [21:24] and we have not spent our time and energy trying to figure out that puzzle yet. [21:28] We want to get this passed, we want to get it approved, [21:30] And then we will shift all of our focus from getting the master plan passed to figuring out how we're going to pay for it. [21:37] And our goal is to have a ballot initiative in 2028 in that election cycle with a plan in place for how we do that, okay? [21:48] All right, we're at the Q&A part, and I finished seven minutes before I thought I would, so that was solid. [21:55] Does anyone have any questions? [22:05] Clearly, my name is Bill O'Connor. [22:10] My question is that, [22:12] why is Wheeler historical? Just because it's old? [22:17] Looking at it, it doesn't seem to have any [22:20] unique design that I can see, nor [22:24] do I know of any activity of a historical nature of something happening there [22:29] as to why you wouldn't maintain it. [22:31] I mean, so it strikes me, it's just because it's old. [22:41] Lee Blatler, Wheeler Auditorium used to be, [22:46] was built by a local individual, Mr. Wheeler. [22:56] I think it was used for the purposes of military [23:00] during World War II area. [23:06] I think it was its primary purpose, so there's the historic military function. [23:14] Just to answer that, I'm not defending it, I'm just saying that. [23:17] I think originally what it was for. [23:20] Does anybody have any other? [23:22] Would it agree or disagree? [23:29] Sorry, can you say that into the mic? [23:30] So I'm sorry, my name is Dan Donovan and I'm with the Gilroy Historical Society. [23:35] So we do study these things and that's where a lot of the resistance is coming to taking that building down. [23:42] Mr. Wheeler was a pretty major influence in the history of Gilroy. [23:49] He was a, I guess he was an agricultural person. [23:53] he had a seed facility that supplied a lot of places throughout the state. [24:01] And he was [24:02] involved with a lot of the, say, more powerful people in Gilroy from, say, 1915 through the [24:10] late 1940s. [24:14] Beyond that, it was used as an armory during World War II. Yep, by the [24:20] National Guard. [24:25] Thank you all. Any other questions? [24:32] State your name first and then [24:34] ask away. Jessica Wilson. So the multi-generational building that you're [24:40] talking about and the services that will be available, will those be free to [24:44] the public or will people have to pay like it's the YMCA? So the current plan [24:49] that we are operating under would be a free model. That is our that is what [24:53] we entered into the Civic Center master plan development with the [24:56] thinking in mind that it would not be a CRC style, [25:00] like the Morgan Hill CRC is partnered with the YMCA. [25:04] We would be, my understanding as of now [25:06] is that we would be managing that moving forward. [25:08] I do wanna say things do change and models change [25:11] so I'm not, I can't say with 100% certainty [25:13] it will stay that way, [25:15] but that is the plan we are operating under now. [25:17] Okay. [25:18] The incorporation of the senior center into there [25:21] with that also the kitchen area [25:24] that's involved with the senior center [25:26] would that then be expanded? Would that be available to other citizens to use for [25:30] events? Or like rent out the kitchen to use for private events? Not rent out the [25:35] kitchen but let's say we had events for the whole public and not just seniors. [25:41] What happens with the kitchen? Is the kitchen available to others? I'm sure it [25:44] would be. We haven't gotten to that point in finding things out but I'm [25:48] sure it would operate under the same parameters that our current kitchen [25:51] does. And then the maintenance of such things as the pool which the [25:54] the city doesn't currently maintain any pools, right? [25:57] Would that be managed under the Parks and Rec Department? [26:08] We operate the Christopher pool and maintain that one. [26:14] And [26:23] we contract for the services that are run there. [26:25] I'm repeating so that the recording picks it up. [26:37] Who would maintain and operate the pool? [26:39] Who would be responsible for maintaining the pool? [26:42] Again, this would be a city-owned facility [26:46] there. [26:55] Got it. [26:56] Okay, and then one last thing. Is there already somebody in a position of the [27:03] city council who would be overseeing programming of what would be going on at [27:08] the theater? Who would be doing that? We haven't gotten to that point. Okay, so [27:12] the some of the positions don't exist yet. It's potentially or it would be an [27:17] expansion of responsibilities. Got it. So it doesn't necessarily mean that there [27:22] or would be additional hiring? [27:24] No, it does not mean that at all. [27:26] Okay, one last question. [27:29] So if the city halls expanded to that size [27:33] because there are people working outside, [27:36] would those employees then be required [27:38] to come into the office [27:39] or can they continue to work from outside? [27:41] Because some don't even live here. [27:44] So the employees I was referencing, [27:47] currently we have staff that operates [27:49] out of the senior center. [27:50] We have staff that is in the annex, we have staff that is at fire stations, and we have [27:55] staff that is at our corp yard. [27:58] So not all, like the guys and gals that operate out of the corp yard, some of them would stay, [28:03] but some people would end up moving into here. [28:06] So we would be bringing in employees from other facilities that work for the city [28:12] under one roof. [28:13] Does that make sense? [28:14] Yep. [28:15] Great. [28:22] My name's Wells Wadley. [28:24] And I'm here thinking of this as a patron of the library but you said there's still money available. [28:33] But when I look at the plan, what I see first of all is there's a swimming pool on parking [28:38] which is very close to the entrance to the library. [28:42] So my question is are you planning to shift the entrance of the library to the other side of the building? [28:49] because that pool is taking away parking places which are very close to the main [28:56] entrance to a library. And also, and related to that, is there will be [29:05] competition between pool users and library users for those parking spaces, [29:11] and I suspect that people will stay in the pool longer than people will stay [29:16] in the library. So that's my question about, I mean, a solution might be to shift the entrance [29:24] to the, what would that be, the west side of the library. But it's now... [29:32] So there are two entrances to the library currently. There is one right about at the [29:37] T on street at 6, if you take it right up to the building, that's where one entrance [29:41] is. The second one is on the plaza side, the exact same entrance is up. [29:45] And they're opposite each other. [29:46] Yes, right. So we would not change their main entrance. The only thing that would change is rather than having, because currently, this is, this will give you a good view of what the current is. Let me back up and find it. [29:58] So current... [30:00] Finally, parking is along 6th Street in front of the library. That's the primary library parking. [30:08] The parking lot between Wheeler and the library is used both for the library and for Wheeler. [30:14] And then you have the parking strip in Hannah right up along the back of the library. [30:18] What we would be doing is expanding the parking on Hannah. [30:21] So we would take the parking that's between Wheeler and the library, [30:25] and move it to the other side of Hanna and then double or triple it. It would be [30:30] significantly bigger in this setup. Sorry, I have a lot of slides to click [30:36] through. So it might be a tiny bit like it might be like 15 more steps to get to [30:44] the library coming from the Hanna side versus the Wheeler side. It's a slight [30:49] alteration to the plan but the expanded parking that you would get on the [30:54] would increase the number of parking stalls available, and we're not touching the parking stalls [30:59] that are currently by the main entrance of the library. [31:02] But where are the pool users parking in your imagination? [31:06] Somewhere in the parking lot. [31:08] Right by the library, I think. [31:10] I'm sure everybody that comes would try to do that. [31:12] But I think there is room to find dedicated library parking [31:17] or reserve for library user parking within that area. [31:20] But again, that's one of those things that we haven't finalized yet. [31:24] Sorry, I saw a hand in the back, so I'm going to go to her first. [31:31] I'm Margaret Aaron, and I live pretty much right across the street from the library. [31:37] I have used the CRC up in Morgan Hill. [31:40] Love it, it's a wonderful thing. [31:42] My main concern at this point is actually traffic in the area. [31:45] We have two lane roads. [31:47] They're pretty stuffed already. [31:49] The CRC has four lanes. [31:51] They have Monterey and that's dedicated. [31:55] and they're not surrounded by residential. [31:59] So I've not really seen anything in this plan that addresses increased traffic, [32:04] which 6th Street, since they opened the overpass, is pretty packed already. [32:09] So is there anything that in the ER? [32:12] So we have initiated a traffic impact study. [32:16] ELS is overseeing that. [32:18] And the return on that was that the change in traffic patterns would be minimal, [32:21] given what the current footprint already is and the current usage. [32:25] You ever [32:28] mentioned the on-street parking? [32:31] I did. [32:31] And [32:36] to John's point, [32:39] but did I already pass it? [32:41] You just passed it. You had it on. [32:43] It's so many slides. [32:45] That's my fault. [32:47] Oh no, I went the wrong way again. [32:52] See what happens when I get to clicking? [33:06] So can you guys see these orange dots [33:08] kind of that run along here? [33:10] Those would be the dedicated street parking that John is referencing. [33:18] Your question, ma'am? [33:23] I believe you had referenced Lee. [33:28] You had mentioned earlier in your presentation about the increased number of parking space, [33:33] what the total would be. [33:34] So what is it now and what would it would be? [33:37] Secondly, I think some of you visited Wheeler Auditorium this morning [33:44] and saw some pickleball being played. [33:46] So I don't know if that pickleball pickleballers will be able to play at the new basketball courts [33:53] That's parts of park and rec [33:56] Third I remember when the police station was built it was supposed to park [34:00] It was supposed to be underground and then you know there wasn't the moneys and now it's elevated [34:06] So that's just you know, and you don't financing isn't available yet. So, you know, what's gonna? [34:12] I don't know that just putting that out there and [34:16] And for right now, that's all that comes to mind. [34:28] Just because you were showing this square footage [34:32] for the buildings being just over 40,000, [34:35] my quick math says that's 200 by 200. [34:39] So is that floor space, or is that [34:41] the footprint of the building? [34:43] That is the footprint of the total building. [34:45] So if I, yeah, total square footage. [34:56] So if you look at this when we post it online, [35:00] I'll try and zoom in here so you can see it a little bit better. [35:03] But it would show within the lower levels how many dedicated square foot is to each section [35:09] that we talk about. [35:13] So it gives you that breakout of how we get to a total building area of square foot [35:18] of 41,600. [35:20] The [35:25] question was, what is the foot [35:31] 40,000? [35:32] And that's 200 by 200. [35:35] And if you have two floors, then I'm thinking, OK, well, I got 200 by 100. [35:42] It's not equal 20,000 to 20,000, but it's roughly that. [35:48] So [35:52] your hand, then, will come to you, sir. [35:55] Ruben Mediovia. [35:56] Yeah. [35:57] I was a president in some of the conversations earlier last year, [36:01] and I remember there was a lot of talk [36:03] about in the Civic Center Park area [36:07] having had a kind of like a built-in stage or space [36:12] for like performances and that kind of thing was that. [36:16] Did that, does that still exist? [36:21] And if so, where would it be? [36:23] or is it mostly gonna be up to people who program those events [36:28] to produce stages for each of those events? [36:30] We decided to eliminate the permanent stage [36:32] from the park space, and the reason for that was [36:35] there was just no real good area to put it [36:38] that worked within the footprint. [36:40] Either you're sending sound directly to houses [36:43] which we didn't wanna do, [36:44] or you're sending it directly into one of the new [36:47] buildings where it's gonna reverberate and bounce back, [36:49] which makes for bad audio. [36:51] So, our determination was if we're going to have events with concerts, we can do stage [36:55] rentals to help create a better environment. [37:00] That makes sense. [37:01] And then, I think I also asked this question before, but there, I know there's, it has, [37:09] you mentioned the ability to add a parking garage. [37:12] much, [37:14] is that included currently in the plan already as a structure and if not then why [37:23] not already include it if we're going to go after all this money might as well. [37:28] It is not currently included in the plan. [37:30] The plan currently only calls for a surface lot. [37:32] But we wanted to keep that option there in the event that we build it and then we [37:37] find out this isn't functional, it's not working properly. [37:41] we need to have an ability to add more so it's one of those things where we could [37:45] build it in now and it raised the cost of the total project or it's one that we [37:52] keep in our back pocket as a contingency so that if it's something we feel is [37:56] needed we know what the plan of action is to to pursue it okay all right if you [38:04] wouldn't actually mind passing them thank you I'm Greg Felios we have these [38:10] all these different projects going on, how did you determine which is the priority? [38:16] Because you're not going to be doing all those things all at once. [38:19] You're going to take them pretty much one at a time, aren't you? [38:22] And it's going to be spread out. They're not going to be doing all those projects. [38:25] They're not going to be turning something down and building it up. [38:28] It's a great question. We haven't figured it out yet. [38:30] It's a part of the financing and phasing plan, which we'll shift all of our focus to [38:34] once we get the master plan adopted. [38:36] decide which is the priority. What do we need first? What do we need now? [38:41] This is going to take a while. It's a lot of math and a lot of hoops [38:45] to jump through and a lot of strategic planning [38:48] and conversations that have to take place to figure out what's the priority, [38:52] what can we do, what's the best way to not disrupt city hall, [38:55] not disrupt the senior center, not disrupt the activities at Wheeler. [39:00] There's a lot of balls you've got to juggle to figure out what that plan is [39:03] and we haven't shifted our focus to it yet. [39:05] Okay, thank you. [39:06] I'm curious. [39:07] I'm sure you've done studies with the growing population. [39:12] Again, this is going to take years and years. [39:13] This is going to take years and years. [39:16] And hopefully we'll all still be here in Gilroy to appreciate it. [39:20] Right. [39:21] And a lot of this is for future for people coming in. [39:26] This is going to be a selling point, an attraction point. [39:34] And hopefully, for all that we're putting into it, hopefully it'll get the use and hopefully [39:41] you've projected how much use each one of these things is going to get. [39:45] Yeah. [39:45] I certainly hope so. [39:47] Okay. [39:47] Thank you. [39:50] Any other questions or comments? [39:54] Nothing? [39:55] Okay. [39:56] Well, thank you all again very much for being here. [39:59] Like I said, this will be posted online by the end of the week. [40:03] So if you want to check it out, go to cityofgilroy.org, backslash, ccmp, and if you have any questions [40:16] that you didn't feel comfortable asking today, you can email me, ryan.austenton, at cityofgilroy.org, [40:22] and I will add all of your questions into what we submit to ELS and EMC. [40:27] So that's it for tonight. [40:29] Thank you all again for being here, and have a great evening. [40:33] Survivors on at 8.