1 00:00:46,260 --> 00:00:46,620 Good evening. 2 00:01:10,610 --> 00:01:13,870 Katie is finalizing her stuff, but she should be on in just a second. 3 00:01:14,270 --> 00:01:15,630 Cole is going to join us, too. 4 00:02:22,840 --> 00:02:24,800 Stacey, can you just confirm you can hear me? 5 00:04:51,930 --> 00:04:52,410 Good evening. 6 00:04:55,750 --> 00:04:56,230 Hi, Mary. 7 00:04:56,890 --> 00:04:57,210 Hi. 8 00:04:58,510 --> 00:05:00,190 I didn't think we were even going to be on. 9 00:05:00,370 --> 00:05:03,210 So thank you guys for opening up the meeting and recording. 10 00:05:03,630 --> 00:05:06,690 I recognize it, but I like this. 11 00:05:08,910 --> 00:05:10,830 Did we hear back from Mr. Mulherrin? 12 00:05:12,310 --> 00:05:13,250 Not that I'm aware. 13 00:05:13,470 --> 00:05:14,690 I think we're, we never did. 14 00:05:14,690 --> 00:05:15,570 that I'm not sure what happened. 15 00:05:16,170 --> 00:05:19,690 Okay, I do believe I've kind of talked to him this week 16 00:05:19,690 --> 00:05:21,970 and I know his intention was to participate. 17 00:05:22,530 --> 00:05:22,730 Okay. 18 00:05:23,730 --> 00:05:24,150 We'll see. 19 00:05:24,270 --> 00:05:25,990 Yeah, I told him to maybe check the spam folder 20 00:05:25,990 --> 00:05:29,590 and I know she did because I had had some issues 21 00:05:29,590 --> 00:05:32,450 with his emails going immediately to spam 22 00:05:32,450 --> 00:05:34,910 for some reason for quite some time, so. 23 00:05:36,810 --> 00:05:37,870 Well, we'll see. 24 00:05:38,050 --> 00:05:39,110 Maybe he wasn't getting our emails. 25 00:05:50,750 --> 00:05:52,470 We need more members, Mary. 26 00:05:53,190 --> 00:05:53,750 Yeah. 27 00:05:58,570 --> 00:06:00,690 We have a quorum tonight regardless. 28 00:06:03,070 --> 00:06:04,470 Even if John's not here. 29 00:06:04,770 --> 00:06:07,590 Five, six. Yes, six. Well, that's good. 30 00:06:09,940 --> 00:06:15,590 Six we're planning to attend. So without counting, John. 31 00:06:16,750 --> 00:06:17,850 All right, 32 00:06:21,010 --> 00:06:21,890 where are my comments? 33 00:06:26,090 --> 00:06:33,230 Stay? Yes, sorry. No, definitely not. I should probably turn my video on so you can see me 34 00:06:33,230 --> 00:06:37,250 moving cats around. I'm just teasing. I suspected that's what 35 00:06:37,250 --> 00:06:39,850 you were doing, but I had your cats know how to stay on 36 00:06:39,850 --> 00:06:41,630 command. I had to open the door. 37 00:06:43,950 --> 00:06:45,270 They listen pretty well. 38 00:07:04,980 --> 00:07:07,560 There's John. John. Good deal. 39 00:07:12,480 --> 00:07:14,060 You don't have to RSVP if you 40 00:07:14,060 --> 00:07:15,940 just show up. Right, John? 41 00:07:19,110 --> 00:07:22,030 He says right. He's on mute. I 42 00:07:22,030 --> 00:07:22,170 know. 43 00:07:26,870 --> 00:07:32,010 I was on mute. I know. Right. Didn't read my 44 00:07:34,430 --> 00:07:34,870 And 45 00:07:39,730 --> 00:07:47,970 Dave, I thought you were a not going to make it but you are here glad to see this and you're on mute also. 46 00:07:52,040 --> 00:07:55,980 I can't hear Dave you're on mute but I just know I know yeah. 47 00:08:02,720 --> 00:08:07,640 We definitely have a quorum so that's delightful to see both Dave and John. 48 00:08:10,540 --> 00:08:13,600 Kelly, I don't know if we put this anywhere. 49 00:08:14,000 --> 00:08:21,000 We're reading written comments after we take public comment in case the person who's written 50 00:08:21,000 --> 00:08:21,700 in speaks. 51 00:08:23,120 --> 00:08:27,040 So we have talked about this a few times, and Mary, correct me if I'm wrong, but your 52 00:08:27,040 --> 00:08:30,540 preference was that we read the comments first in case those that were planning on 53 00:08:30,540 --> 00:08:36,280 making a comment heard their comment already and then didn't want to speak, I don't 54 00:08:36,280 --> 00:08:36,420 know. 55 00:08:36,420 --> 00:08:42,320 Well, you had we're going to ask them at that time if they have written a comment whether they want the comments read or 56 00:08:43,180 --> 00:08:49,800 Okay, whether they'd like to speak to the audience in lieu of reading the comments. We weren't going to do both 57 00:08:49,800 --> 00:08:52,060 right, so I 58 00:08:52,060 --> 00:08:55,860 Don't really I don't have a preference in how we do it. I just want to make sure we make we 59 00:08:56,440 --> 00:09:01,860 You know say that in the beginning so okay, that's in the opening statement for yeah 60 00:09:01,860 --> 00:09:06,300 And in the opening statement the way I worded it says that we're going to read the comments first 61 00:09:06,420 --> 00:09:12,800 Is that correct? So if we can if we're going to change that plan, let me know and I will modify my comments 62 00:09:14,120 --> 00:09:22,220 Mary I believe it's they either have a written comment or they can speak they're not supposed to do vote right right, okay 63 00:09:23,040 --> 00:09:28,540 You look like you're cold. I know doesn't she mm-hmm 64 00:09:30,080 --> 00:09:33,620 Okay, I look cold I'm always cold 65 00:09:33,620 --> 00:09:35,260 Perpetually cold. 66 00:09:37,410 --> 00:09:37,740 What? 67 00:09:38,800 --> 00:09:41,080 That was in a Floridian, but it was just Chicago. 68 00:09:42,990 --> 00:09:43,730 It's my own fault. 69 00:09:44,150 --> 00:09:44,230 I 70 00:10:04,390 --> 00:10:05,910 need a bigger platform here. 71 00:10:06,110 --> 00:10:11,610 I've got papers, and it's only one agenda item, 72 00:10:11,650 --> 00:10:14,330 but it's generated a lot of paper today. 73 00:10:46,900 --> 00:10:48,500 I bought a Christmas tree today. 74 00:10:49,420 --> 00:10:49,760 Aww. 75 00:10:49,900 --> 00:10:50,360 Yay. 76 00:10:59,030 --> 00:10:59,510 Congratulations. 77 00:11:00,130 --> 00:11:02,670 I'm going to get my Christmas decoration up pretty soon. 78 00:11:02,670 --> 00:11:07,330 So it's a Grinch tree. It's cute. Oh, thank you 79 00:11:09,250 --> 00:11:10,290 Trader Joe's 80 00:11:14,900 --> 00:11:19,520 It's Tracy doing show and tell is that what's going on? I got a Grinch tree today 81 00:11:20,340 --> 00:11:28,000 I now have a Grinch tree and which was a lie and then I have a fake Charlie Brown tree Trader Joe's 82 00:11:28,760 --> 00:11:35,870 The Grinch tree was at Trader Joe's. Yeah, they always get me with that thing right when you walk in the door 83 00:11:35,870 --> 00:11:36,750 I've 84 00:11:42,700 --> 00:11:44,300 got three screens going 85 00:11:49,960 --> 00:11:53,020 All sorts of documents I might need to reference. 86 00:11:54,600 --> 00:11:58,540 I just got one screen and then documents behind it. So I will. 87 00:11:59,080 --> 00:12:02,400 I have no doubt I will get confused today. So anyway. 88 00:12:03,300 --> 00:12:04,340 Just going to happen. 89 00:12:22,140 --> 00:12:25,280 So I, I think we've got all of the plan commission. 90 00:12:26,060 --> 00:12:28,540 Missioners here that are planning to attend. Is that correct? 91 00:12:28,720 --> 00:12:30,300 We are just going to miss. 92 00:12:31,380 --> 00:12:33,980 Commissioner Berry, correct? Okay. 93 00:12:36,100 --> 00:12:45,340 That's why my clock is ticking towards 7. And I'm assuming the petitioners here, but we do have a lot of attendees and I'm not sure if they are. 94 00:12:45,880 --> 00:12:46,860 Let me look. 95 00:12:49,750 --> 00:12:51,310 One of them is here. Yes. 96 00:13:10,070 --> 00:13:22,170 We're good. Yep. All right. All right. I think I'm then going to go ahead and call to order the village of Glen Allen Plan Commission meeting for Thursday, November 7. 97 00:13:22,170 --> 00:13:30,010 12, 2020. I have some remarks that I'm going to read before we do our roll call vote for 98 00:13:30,010 --> 00:13:34,190 those who are in attendance so they understand the proceedings if they haven't been to one 99 00:13:34,190 --> 00:13:38,910 of our plan commission meetings via Zoom before or even a plan commission meeting at all. 100 00:13:39,330 --> 00:13:44,230 So good evening. My name is Mary Locke and I'm the chairperson of this commission. The 101 00:13:44,230 --> 00:13:48,930 Glen Ellen Plan Commission is advisory in nature and the actual cold relief requested 102 00:13:48,930 --> 00:13:52,270 can only be granted by the village of Glenelon Board of Trustees. 103 00:13:53,230 --> 00:13:58,890 The plan commission's function is to listen to whatever testimony is offered by the petitioners and others. 104 00:13:59,270 --> 00:14:03,990 We take significant evidence, listen to input from the petitioners and the audience, 105 00:14:04,370 --> 00:14:07,670 agree on the facts which we have found from the evidence, 106 00:14:07,950 --> 00:14:12,670 consider and deliberate amongst ourselves, and then we make a recommendation to the village board. 107 00:14:12,670 --> 00:14:18,510 forward. This meeting will be conducted by video conference through Zoom without a physically 108 00:14:18,510 --> 00:14:23,790 present quorum of the Plan Commission because of a disaster declaration related to COVID-19 109 00:14:23,790 --> 00:14:29,790 and public health concerns affecting the village of Glen Ellen. An in-person meeting at the 110 00:14:29,790 --> 00:14:34,050 Civic Center is not practical or prudent because of the disaster and therefore the 111 00:14:34,050 --> 00:14:42,650 chairperson, commissioners, village manager, village attorney and any members of the 112 00:14:42,650 --> 00:14:47,070 at the Civic Center. The commissioners and staff participating in tonight's meeting 113 00:14:47,070 --> 00:14:50,570 are in different locations in accordance with the social distancing guidelines. 114 00:14:51,890 --> 00:14:54,770 It is important that the public hearings scheduled for tonight 115 00:14:55,180 --> 00:14:59,790 be heard to continue critical village business which will enable ongoing 116 00:15:00,000 --> 00:15:05,120 Construction, development, protection of property values, and the promotion of the village's 117 00:15:05,120 --> 00:15:10,700 economic vitality. Any individual desiring to listen and or participate in the meeting by 118 00:15:10,700 --> 00:15:15,660 telephone or through the electronic meeting platform has been provided that opportunity 119 00:15:15,660 --> 00:15:23,600 through Zoom participation information included in the various public notices and the agenda 120 00:15:23,600 --> 00:15:29,040 for this meeting. Since we are using an electronic meeting platform, we expect there to be some 121 00:15:29,040 --> 00:15:33,080 technical difficulties as we move through our agenda, or maybe we should say maybe not 122 00:15:33,080 --> 00:15:34,360 expect that it might happen. 123 00:15:34,660 --> 00:15:35,600 So please bear with us. 124 00:15:36,060 --> 00:15:39,280 At this point, I would like to describe the remote proceedings of the Plan Commission 125 00:15:39,280 --> 00:15:41,720 for those of you who are not familiar with the process. 126 00:15:42,840 --> 00:15:46,940 For the item on the agenda this evening, the staff will make a presentation on the 127 00:15:46,940 --> 00:15:47,780 request first. 128 00:15:48,400 --> 00:15:51,560 Then the Plan Commission will ask the questions of the staff. 129 00:15:52,780 --> 00:15:57,200 The petitioner will then make a presentation on their proposal, and the Plan Commission 130 00:15:57,200 --> 00:15:59,080 we'll ask questions of the petitioner. 131 00:15:59,820 --> 00:16:01,580 When it is time for public comment, 132 00:16:02,100 --> 00:16:05,440 staff will read into the record any comments received 133 00:16:05,440 --> 00:16:07,360 in writing in advance of the meeting. 134 00:16:08,380 --> 00:16:12,100 Note, if you're on the call and you did submit written comments, 135 00:16:12,800 --> 00:16:15,120 would you, if you would rather speak to the commission 136 00:16:15,120 --> 00:16:16,680 during the public comment portion 137 00:16:16,680 --> 00:16:18,960 rather than have your comments read, 138 00:16:19,060 --> 00:16:21,420 please raise your hand through the Zoom platform 139 00:16:22,260 --> 00:16:24,180 to let us know of your preference. 140 00:16:25,380 --> 00:16:33,520 prior to the staff reading the comments. Public participation may provide comments either through 141 00:16:33,520 --> 00:16:39,080 written comments or speaking. This is to ensure each person is provided an equal amount of time 142 00:16:39,080 --> 00:16:43,880 to comment. Following the reading of any written comments, which of course we have some for this 143 00:16:43,880 --> 00:16:51,900 evening, members of the audience who wish to speak will be asked to raise their hand through the 144 00:16:51,900 --> 00:16:59,020 be called on, unmuted, and given three minutes to comment. After you speak, you will be muted once 145 00:16:59,020 --> 00:17:05,540 again. Please note that there may be a slight delay between becoming unmuted and being able to begin 146 00:17:05,540 --> 00:17:12,320 speaking or being heard by us. Everyone who will be presenting information or asking questions to 147 00:17:12,320 --> 00:17:17,680 this commission during the public hearing will be required to do so under oath and all comments 148 00:17:17,680 --> 00:17:20,880 will be recorded so that written minutes can be prepared for this meeting. 149 00:17:21,960 --> 00:17:26,280 Just a reminder that all speakers are asked to present their comments in a respectful 150 00:17:26,280 --> 00:17:27,840 and courteous manner. 151 00:17:28,600 --> 00:17:32,400 If inappropriate language or comments are expressed during this meeting, we will mute 152 00:17:32,400 --> 00:17:34,340 the speaker and end their participation. 153 00:17:35,720 --> 00:17:39,900 After the public comment portion of the meeting, the public hearing will be closed 154 00:17:39,900 --> 00:17:42,260 and no further comment from the public will be permitted. 155 00:17:42,260 --> 00:17:53,040 The plan commission will discuss the material that has been presented and make our recommendation to the village board. Everyone is welcome to stay and hear our deliberations. 156 00:17:53,920 --> 00:18:03,240 With us tonight for the benefit of those in the audience, we have community development director Stacy Springer, who is raising her hand who is administering this meeting on zoom. 157 00:18:03,240 --> 00:18:10,020 We have Planner Kelly Purvis, we have Planner Katie Ashbaugh, and Associate Planner Cole, 158 00:18:10,380 --> 00:18:15,720 who may be on here via phone, because I don't see his name in the panelist's discussion. 159 00:18:16,300 --> 00:18:23,600 And we have Bill Enright, our Village Board trustee, and we have Barb Dutton, our recording 160 00:18:23,600 --> 00:18:24,200 secretary. 161 00:18:25,480 --> 00:18:28,120 Would Barb please call the roll? 162 00:18:35,190 --> 00:18:38,190 Director Springer, I think that Barb might be in the attendees, 163 00:18:41,420 --> 00:18:43,220 her phone might be. 164 00:18:43,580 --> 00:18:45,600 Yeah, just got moved over, and though she has to unmute. 165 00:18:57,880 --> 00:18:58,840 So, Barb, can you unmute? 166 00:18:58,960 --> 00:19:00,120 Because we can't hear you, please. 167 00:19:11,480 --> 00:19:14,080 Well, should we deal with this technical difficulty 168 00:19:14,080 --> 00:19:17,380 that someone else want to call the roll, so we can move on? 169 00:19:17,860 --> 00:19:18,080 Yeah. 170 00:19:18,180 --> 00:19:20,940 All right. I'm trying this. Can you hear me now? 171 00:19:21,300 --> 00:19:22,200 I can hear you now. 172 00:19:22,940 --> 00:19:25,200 Okay, try to different methods to unmute. 173 00:19:26,000 --> 00:19:26,820 Saved by the label. 174 00:19:26,820 --> 00:19:33,100 All right. I will now take the roll. Chairperson Locke. 175 00:19:33,100 --> 00:19:33,280 Here. 176 00:19:34,960 --> 00:19:36,140 Plan Commissioner Berry. 177 00:19:39,870 --> 00:19:40,890 Plan Commissioner Brown. 178 00:19:42,190 --> 00:19:42,490 Here. 179 00:19:44,960 --> 00:19:46,000 Plan Commissioner Fanella. 180 00:19:47,490 --> 00:19:47,960 Here. 181 00:19:50,190 --> 00:19:51,650 Plan Commissioner Heming-Litwin. 182 00:19:52,550 --> 00:19:53,350 Here. 183 00:19:54,610 --> 00:19:56,570 Plan Commissioner Moharan. 184 00:19:57,250 --> 00:19:57,590 Here. 185 00:19:58,890 --> 00:20:00,530 Plan Commissioner Roderman. 186 00:20:00,530 --> 00:20:10,330 them. Here. Plan Commissioner Saeed. Here. Plan Commissioner Vandreska. Here. 187 00:20:12,710 --> 00:20:13,170 Chairperson 188 00:20:13,170 --> 00:20:18,270 Locke, we have a quorum. All right. Thank you so much, Barb. The next thing I need is 189 00:20:18,270 --> 00:20:24,710 a motion to allow remote participation by the Plan Commission. So moved. In a second 190 00:20:24,710 --> 00:20:31,310 please. I second. Thank you. And Barb, we had Commissioner Heming-Litwin and I believe 191 00:20:31,310 --> 00:20:36,830 Commissioner Saeed. Make a motion and second would you take a roll call vote please again? 192 00:20:37,510 --> 00:20:45,330 I will do. Plan commissioner Heming-Litwin. Yes. Plan commissioner Saeed. Yes. 193 00:20:46,710 --> 00:20:48,490 Chairperson Locke. Yes. 194 00:20:51,220 --> 00:20:57,180 Plan commissioner Brown. Yes. Plan commissioner Fanella. Yes. 195 00:20:57,180 --> 00:20:57,700 Yes. 196 00:20:58,240 --> 00:20:59,540 Plan Commissioner Moharan. 197 00:21:00,100 --> 00:21:00,460 Yes. 198 00:21:01,620 --> 00:21:02,740 Plan Commissioner Rodiman. 199 00:21:03,380 --> 00:21:03,940 Yes. 200 00:21:04,860 --> 00:21:06,440 Plan Commissioner Von Druskow. 201 00:21:06,920 --> 00:21:07,340 Yes. 202 00:21:08,940 --> 00:21:10,220 The motion passes. 203 00:21:10,880 --> 00:21:12,100 Okay, thank you very much. 204 00:21:13,420 --> 00:21:16,020 The next agenda item would be public comment 205 00:21:16,020 --> 00:21:18,500 by anybody who is in the intended portion 206 00:21:19,020 --> 00:21:21,280 that would like to speak to the plan commission 207 00:21:21,280 --> 00:21:24,100 on a topic that is not on tonight's agenda. 208 00:21:24,100 --> 00:21:30,120 Given that tonight's agenda is predominantly the development of the McChesney site. 209 00:21:30,380 --> 00:21:33,980 If anybody is here to speak to the plan commission on a subject other than that, 210 00:21:34,100 --> 00:21:38,000 now is your opportunity to raise your Zoom hand and let us know. 211 00:21:40,700 --> 00:21:43,540 Does anybody see anybody who is raising a hand on that? 212 00:21:44,140 --> 00:21:45,260 I do not. 213 00:21:45,640 --> 00:21:46,600 I do not either. 214 00:21:47,160 --> 00:21:47,320 Okay. 215 00:21:50,040 --> 00:21:54,940 The next agenda item would be approval of the draft minutes from the October 22nd, 216 00:21:54,940 --> 00:21:56,660 2020 plan commission meeting. 217 00:21:58,060 --> 00:21:59,960 Is there any discussion on the minutes? 218 00:22:03,860 --> 00:22:05,560 All right, may have a motion to approve them. 219 00:22:06,220 --> 00:22:07,220 So moved. 220 00:22:07,640 --> 00:22:08,280 May have a second? 221 00:22:09,920 --> 00:22:10,480 Second. 222 00:22:11,220 --> 00:22:14,320 All right, may have a roll call vote please. 223 00:22:14,760 --> 00:22:18,360 Barb, Commissioner Heming-Litwin made the motion 224 00:22:18,360 --> 00:22:20,220 and Commissioner Mulherrin had the second. 225 00:22:21,000 --> 00:22:22,840 OK, here we go. 226 00:22:23,600 --> 00:22:25,580 Plan commissioner Heming-Litwin. 227 00:22:25,580 --> 00:22:26,980 Yes. 228 00:22:27,940 --> 00:22:28,900 1. 229 00:22:28,960 --> 00:22:29,520 2. 230 00:22:32,140 --> 00:22:32,220 4. 231 00:22:49,260 --> 00:22:50,220 8. 232 00:22:51,040 --> 00:22:51,720 9. 233 00:22:58,280 --> 00:22:58,360 12. 234 00:22:58,360 --> 00:22:58,380 14. 235 00:22:58,380 --> 00:23:06,860 the motion passes. Okay, thank you very much. Our next agenda item is the development or the 236 00:23:06,860 --> 00:23:15,420 request, excuse me, for the development of the Glenwood station and it's a PUDD request with 237 00:23:15,420 --> 00:23:21,380 the public hearing. And what I need before we get started is a motion to open the public 238 00:23:21,380 --> 00:23:30,580 hearing, please. So moved. I need a second, please. Second. Again, Barb, Commissioner 239 00:23:30,580 --> 00:23:35,200 Heming-Litwin made the motion to open the public hearing. Commissioner Mulherran, 240 00:23:35,280 --> 00:23:41,340 seconded it. May I have a roll call vote, please? Yes. Plan Commissioner Heming-Litwin. 241 00:23:43,610 --> 00:23:44,850 Yes. 242 00:23:45,850 --> 00:23:47,870 Thank Commissioner Mulherin. 243 00:23:49,930 --> 00:23:51,450 Chairperson Locke. 244 00:23:51,810 --> 00:23:51,950 Yes. 245 00:23:52,910 --> 00:23:54,150 Thank Commissioner Brown. 246 00:23:54,910 --> 00:23:55,190 Yes. 247 00:23:56,510 --> 00:23:57,750 Thank Commissioner Fanella. 248 00:23:58,150 --> 00:23:58,870 Yes. 249 00:24:00,030 --> 00:24:01,110 Thank Commissioner Rodiman. 250 00:24:01,950 --> 00:24:02,370 Yes. 251 00:24:03,250 --> 00:24:04,330 Thank Commissioner Saeed. 252 00:24:04,770 --> 00:24:05,290 Yes. 253 00:24:06,010 --> 00:24:07,370 Thank Commissioner Vandreska. 254 00:24:08,070 --> 00:24:08,590 Yes. 255 00:24:09,770 --> 00:24:12,450 The motion to open the public hearing passes. 256 00:24:12,450 --> 00:24:24,530 All right. Thank you very much. We will start our public hearing. And as described in the early comments, the first person who or the staff will now give the overview of the presentation. 257 00:24:24,730 --> 00:24:31,710 And so we will need a swearing in of our presenter who is Katie is Katie presenting us. 258 00:24:32,290 --> 00:24:33,450 All right. 259 00:24:33,450 --> 00:24:43,830 But we are going to also have Kelly and Stacey sworn in as well, just in case we need to jump in and help answer any questions. 260 00:24:44,170 --> 00:24:45,290 Okay, that would be great. 261 00:24:46,250 --> 00:24:52,790 Right, would you please state your name, your professional capacity and your business address for the public record? 262 00:24:54,230 --> 00:25:01,010 So, I'll go first. Stacey Springer, director of community development, 535 Dwayne Street. 263 00:25:02,330 --> 00:25:08,630 Thank you. Kelly Purvis, I am a planner for the village 535 Dwayne Street. 264 00:25:11,390 --> 00:25:16,350 Katie Ashwell, planner for the village of Gwinellin, 535 Dwayne Street. 265 00:25:17,990 --> 00:25:18,690 Thank you, Katie. 266 00:25:23,300 --> 00:25:24,760 All right, Katie, I think you can go. 267 00:25:25,280 --> 00:25:27,460 Well, we need to be sworn. Oh, I'm sorry. 268 00:25:28,020 --> 00:25:35,920 Okay, sorry. All right, next question. Do you swear to tell the truth, the whole truth, 269 00:25:35,920 --> 00:25:46,100 nothing but the truth. I do. I do. I do. Okay. All right. Now you may take it away. Thank you. 270 00:25:46,720 --> 00:25:47,060 All 271 00:25:59,030 --> 00:26:05,890 right. Can everyone see? Yes. State Historic Preservation Review. The wrong 272 00:26:05,890 --> 00:26:13,370 slide. Okay. We'll see Glenwood Station. 460 Crescent. So, Asher Person Locke 273 00:26:13,370 --> 00:26:19,270 introduced tonight we're reviewing a request for planting a development with zoning deviations, 274 00:26:19,590 --> 00:26:25,150 a special use for multifamily dwellings and exterior appearance for the property located at 275 00:26:25,150 --> 00:26:29,610 460 Crescent Boulevard and their request is being made by holiday properties. 276 00:26:30,670 --> 00:26:38,970 So my presentation I'll try to keep it as brief but as informative as possible so I will go 277 00:26:38,970 --> 00:26:44,210 through the public outreach, the review process, background regarding the site 278 00:26:44,210 --> 00:26:49,630 location and the zoning. Then I'll review the project summary and what is being 279 00:26:49,630 --> 00:26:54,210 proposed. I will go through the exterior appearance proposed for the 280 00:26:54,210 --> 00:27:00,150 building and what in greater detail the zoning relief being requested. And then 281 00:27:00,150 --> 00:27:06,570 lastly the plan commission action this evening. So first the public outreach 282 00:27:06,570 --> 00:27:21,350 That is required in accordance with state statue and the village code is that public hearing notice be published in the newspaper 15 to 30 days prior on the public hearing notice was published on October 28, 2020 in the Daily Herald. 283 00:27:21,810 --> 00:27:29,990 And then the public hearing notice was also mailed to property owners with the 350 feet of the subject property on October 27. 284 00:27:29,990 --> 00:27:38,730 and a placard was also placed on the property on the 28th of October. In addition to the 285 00:27:38,730 --> 00:27:46,350 required public outreach and public notice, the village participated in some interviews 286 00:27:46,350 --> 00:27:52,990 with the Daily Herald to spread the word about the development and also released some information 287 00:27:52,990 --> 00:27:55,150 on its various news platforms. 288 00:27:56,190 --> 00:28:00,010 So the day before the public hearing notice was published. 289 00:28:00,490 --> 00:28:02,530 There was an article about tonight's meeting 290 00:28:02,530 --> 00:28:05,790 and the project on October 27th in the Daily Herald. 291 00:28:06,430 --> 00:28:07,730 The village's website, 292 00:28:08,050 --> 00:28:10,570 there's a dedicated webpage as well for the project. 293 00:28:10,950 --> 00:28:13,430 That page was updated on October 30th. 294 00:28:13,670 --> 00:28:15,810 And then on November 4th, 295 00:28:15,810 --> 00:28:18,630 the village's social media platforms 296 00:28:19,430 --> 00:28:21,250 made posts about tonight's meeting. 297 00:28:21,250 --> 00:28:28,190 and then the e-news publication that's released via email and economic development e-news 298 00:28:28,190 --> 00:28:30,470 from the village also included this information. 299 00:28:32,750 --> 00:28:39,070 On the fifth, the electronic message sign by the metro station at Maine and Crescent 300 00:28:39,070 --> 00:28:46,970 also started sharing a notice of the meeting tonight and this last Wednesday's e-news 301 00:28:46,970 --> 00:28:52,030 from the economic development for the village and then also just the standard village e-news 302 00:28:52,030 --> 00:28:57,630 also have information again. And then the downtown alliance also shared information about 303 00:28:57,630 --> 00:29:04,110 tonight's meeting. Oh, and on November 5th, the Chamber of Commerce also sent out an 304 00:29:04,110 --> 00:29:08,730 email blast about tonight's meeting. So there's been a lot of coordination with the 305 00:29:08,730 --> 00:29:14,490 chamber as well as the downtown alliance. So for those in the public that are not 306 00:29:14,490 --> 00:29:17,150 not as familiar with the plan commission review process. 307 00:29:17,930 --> 00:29:21,490 So on May 14th, the petitioner did present 308 00:29:21,490 --> 00:29:24,630 a pre-application meeting for a concept development. 309 00:29:25,170 --> 00:29:27,850 And I'll kind of highlight what parts of the development 310 00:29:27,850 --> 00:29:29,970 are different tonight versus what 311 00:29:30,650 --> 00:29:32,510 the plan commission reviewed back in May. 312 00:29:33,430 --> 00:29:34,890 The pre-application is required 313 00:29:34,890 --> 00:29:37,070 as part of the planning and development process. 314 00:29:37,650 --> 00:29:40,270 And it's informal, no action is taken, 315 00:29:40,490 --> 00:29:41,950 no action was taken at that time. 316 00:29:42,010 --> 00:29:43,290 It was just generic feedback 317 00:29:43,290 --> 00:29:46,330 back to guide the developer prior to submitting 318 00:29:46,330 --> 00:29:47,510 for tonight's hearing. 319 00:29:48,490 --> 00:29:51,830 Tonight, the plan commission will be making a recommendation 320 00:29:51,830 --> 00:29:55,710 to approve approved conditions or deny the requests 321 00:29:55,710 --> 00:29:57,410 that the plan commission's reviewing, 322 00:29:57,710 --> 00:29:59,890 which are the preliminary and final PUD. 323 00:30:00,000 --> 00:30:07,660 A special use permit for multifamily residential, zoning deviations associated with the PUD, and 324 00:30:07,660 --> 00:30:14,140 then lastly, the exterior appearance of the project. And, tentatively, the village board 325 00:30:14,140 --> 00:30:18,340 is scheduled to review the request and the recommendations from the planning commission 326 00:30:18,340 --> 00:30:20,280 on December 14th. 327 00:30:24,210 --> 00:30:28,090 So now to just kind of touch on the zoning and the surrounding conditions 328 00:30:28,090 --> 00:30:36,630 of the property. Property is zone C5B central service sub-district on all four sides across 329 00:30:37,210 --> 00:30:43,990 in across Glenwood is C5A the central retail sub-district primarily to the west is the central 330 00:30:43,990 --> 00:30:52,880 service sub-district. So this is just a zoom in of the zoning map. You'll see immediately to the 331 00:30:52,880 --> 00:30:56,460 south is also the U.P. West rail line. 332 00:30:58,700 --> 00:31:03,400 This is a two-foot contour map of the site. There is 333 00:31:03,400 --> 00:31:11,220 kind of a topography change of the northwest corner and also along the north lot line where 334 00:31:11,220 --> 00:31:16,480 you'll see there's a drop and you'll see later in the site plan where there's a retaining wall 335 00:31:16,480 --> 00:31:19,240 that they'll be extending. 336 00:31:21,840 --> 00:31:24,960 This is an aerial photo of the site to take 337 00:31:25,480 --> 00:31:33,020 orient everyone. This is Glen Oak Cafe. This is Barones. And then this is Boards Auto. 338 00:31:33,720 --> 00:31:39,180 This is the village on Metra lot, the Crescent Glen One Parking Lot. And then across is the 339 00:31:39,180 --> 00:31:41,040 beer cellar and some other retail. 340 00:31:44,000 --> 00:31:46,500 You can see this a little more closely here. 341 00:31:46,500 --> 00:31:53,900 So the existing conditions on the site, the site is eight-tenths of an acre 342 00:31:53,900 --> 00:32:02,100 approximately. On the site now, as has been since 2014, is a single-storey 343 00:32:02,100 --> 00:32:06,040 commercial building formerly in the Chesney Miller grocery store. It's about 344 00:32:06,040 --> 00:32:13,060 13,500 square feet and they're served by 42 stall surface parking lot. 345 00:32:17,000 --> 00:32:17,800 So 346 00:32:17,800 --> 00:32:26,840 six years now and just to kind of look at the street view here. These are all from 347 00:32:26,840 --> 00:32:30,020 Google Street View so sign is still there. 348 00:32:37,730 --> 00:32:39,890 Now to just talk about the 349 00:32:39,890 --> 00:32:45,210 long-range planning that's been done for this area. In general the comprehensive 350 00:32:45,210 --> 00:32:52,190 plan in 2001 did recommend mixed use on this site. It's just outside the 351 00:32:52,190 --> 00:32:58,850 pedestrian shopping area that was identified in 2001. The certain factors 352 00:32:58,850 --> 00:33:04,710 should be considered as part of this as was recommended in 2001. I should note 353 00:33:04,710 --> 00:33:08,770 that the village is currently updating this comprehensive plan and that's still 354 00:33:08,770 --> 00:33:15,310 in review but as of 2001 this is the one that we're still referring to for 355 00:33:15,310 --> 00:33:22,490 the redevelopment of this site and then in 2009 the village approved a 356 00:33:22,490 --> 00:33:25,690 the downtown strategic plan specifically for this area. 357 00:33:26,610 --> 00:33:31,130 It again identified this block as a location for mixed use, 358 00:33:31,350 --> 00:33:35,530 but primarily residential as it's in the C5B district 359 00:33:35,530 --> 00:33:38,570 and it's on the periphery 360 00:33:38,570 --> 00:33:41,070 of the central downtown shopping area. 361 00:33:42,090 --> 00:33:45,770 It also recommended one to lower levels of parking, 362 00:33:46,170 --> 00:33:50,150 which as I'll share later, this building does include that. 363 00:33:50,150 --> 00:33:51,210 So, 364 00:33:54,370 --> 00:34:00,530 in general, the proposed development is five stories, six levels. 365 00:34:00,850 --> 00:34:02,570 So one of the levels is below grade. 366 00:34:03,730 --> 00:34:11,850 The village measures overall maximum height from the average existing grade to the very 367 00:34:11,850 --> 00:34:15,030 top of the building of whatever is on top of the roof. 368 00:34:15,410 --> 00:34:20,170 So the elevator overrun, rooftop mechanical units, those are all included in the overall 369 00:34:20,170 --> 00:34:22,290 maximum height rather than just the roof line. 370 00:34:22,290 --> 00:34:25,650 I'll share some slides later that illustrate this. 371 00:34:26,650 --> 00:34:32,230 This building is actually, the building being reviewed tonight is actually two feet three 372 00:34:32,230 --> 00:34:37,570 inches shorter than the one reviewed on May 14th. 373 00:34:38,480 --> 00:34:43,170 The one reviewed on May 14th was 68 feet 11 inches. 374 00:34:43,590 --> 00:34:47,810 And now the top of the elevator over on it is 66 feet eight inches. 375 00:34:49,090 --> 00:34:55,950 There's also 1,490 square feet of commercial space and one of the comments at the plan 376 00:34:55,950 --> 00:35:01,190 commission meeting in May asked for an increase in the commercial space. 377 00:35:01,570 --> 00:35:08,530 The petitioners accommodated that just over just about a quarter of an increase, quarter 378 00:35:08,530 --> 00:35:13,450 of a square foot and with an increase in 287 square feet. 379 00:35:13,450 --> 00:35:17,230 The number of dwelling units and the number of proposed parking stalls are 380 00:35:17,230 --> 00:35:22,290 the same as was reviewed in May with a 1.2 parking stall per dwelling unit 381 00:35:22,290 --> 00:35:28,030 ratio and the apartment lobby has increased a little bit to 1,350 square 382 00:35:28,030 --> 00:35:28,450 feet. 383 00:35:31,400 --> 00:35:39,120 So something to address, this site is not within either of the 384 00:35:39,120 --> 00:35:44,740 National Registered Districts in the village and the North downtown district 385 00:35:44,740 --> 00:35:51,860 district or the South downtown district. It is also a, not a local landmark. So on the 386 00:35:51,860 --> 00:35:56,500 store preservation commission and the village board have not designated this as a local 387 00:35:56,500 --> 00:36:02,360 landmark requiring any sort of historic review by the village. The State Historic Preservation 388 00:36:02,360 --> 00:36:07,520 Office has also taken a look at the site and they did issue a letter on September 389 00:36:07,520 --> 00:36:13,240 10, 2020 that stated no historic architectural or archeological sites exist within the 390 00:36:13,240 --> 00:36:19,660 project area. However, given it is in the downtown and the community is still 391 00:36:19,660 --> 00:36:23,880 sensitive to new developments, the historic preservation community has taken a 392 00:36:23,880 --> 00:36:28,160 look at the project and did provide feedback, which the petitioner will be 393 00:36:28,160 --> 00:36:33,300 discussing later how they've incorporated some of that feedback and 394 00:36:33,300 --> 00:36:37,280 also architectural precedent from the downtown into their design. 395 00:36:39,720 --> 00:36:41,020 So to kind 396 00:36:41,020 --> 00:36:47,380 And before I go into all of the zoning review, I just wanted to show what was reviewed at 397 00:36:47,380 --> 00:36:49,720 the May 14, 2020, Pre-Application meeting. 398 00:36:50,240 --> 00:36:52,540 And I'll go through some of those renderings. 399 00:36:52,760 --> 00:36:56,040 So this is the southeast corner of the building looking northwest. 400 00:36:57,340 --> 00:37:03,220 They were originally a couple of tower elements on the east and south sides of the building. 401 00:37:03,220 --> 00:37:15,120 and the balconies were not as did not have as reinforced platforms below and the crescent 402 00:37:15,120 --> 00:37:25,020 boulevard first floor elevation was designed differently with some metal grates and plantings. 403 00:37:25,760 --> 00:37:32,680 So what they propose now they have removed the tower elements and they've actually pushed 404 00:37:32,680 --> 00:37:39,740 this the top second through fifth floors back 10 feet from the Crescent lot line 405 00:37:39,740 --> 00:37:46,140 so only the first floor is at the lot line along Crescent to reduce the bulk 406 00:37:46,140 --> 00:37:51,680 and then they've also reinforced the supports under the balconies with some 407 00:37:51,680 --> 00:37:57,680 cast-stone design. They also are proposing six light double-hung windows 408 00:37:57,680 --> 00:38:06,000 And the window and door systems are all black as opposed to the white or light gray seen back in May. 409 00:38:07,140 --> 00:38:17,440 Finally, they are using an Armstrong plaster for material for the cornices, which I'll touch on a little more as I go through the exterior appearance. 410 00:38:18,400 --> 00:38:22,140 So here's the rest of the before and afters. You 411 00:38:28,260 --> 00:38:31,580 can just see a little bit different of the first floor elevation. 412 00:38:31,580 --> 00:38:32,580 and 413 00:38:38,180 --> 00:38:40,400 this is looking southwest. 414 00:38:42,980 --> 00:38:46,680 The balconies previously were just projecting out from the 415 00:38:46,680 --> 00:38:52,340 building and now they've been recessed by one foot and better integrated into the north elevation 416 00:38:52,340 --> 00:38:58,860 and these are the nighttime renderings. 417 00:39:05,160 --> 00:39:08,200 So for the proposed elevations, I'll just start with 418 00:39:08,200 --> 00:39:13,160 some of the material details. They're using three different shades of brick. They've got a 419 00:39:13,160 --> 00:39:22,040 carbon gray, revere pewter gray, and a cranberry velour as the red. And then the cast stone is 420 00:39:22,040 --> 00:39:27,960 more of a limestone type of pew. And then the, again, the windows and door systems are black. 421 00:39:29,180 --> 00:39:34,740 The petitioners also incorporating a clock element here, which they'll speak to in their 422 00:39:34,740 --> 00:39:41,940 presentation. And the second floor apartments now have enlarged balconies 423 00:39:41,940 --> 00:39:47,540 that are consistent size with the club room balcony at the southeast corner. 424 00:39:48,500 --> 00:39:53,340 There's also pedestrian oriented lighting along the Crescent elevation and 425 00:39:54,400 --> 00:39:59,680 over at the southeast corner they're proposing gas lanterns and it's the 426 00:39:59,680 --> 00:40:06,300 pedestrian entrance to that apartment is also covered with an awning. And the garage doors 427 00:40:06,300 --> 00:40:10,920 also have been changed from a more commercial look to a more residential look with the paneled 428 00:40:10,920 --> 00:40:15,560 garage door. And they've been recessed six feet into the building. 429 00:40:20,370 --> 00:40:22,610 So, overall, the 430 00:40:23,990 --> 00:40:29,470 proposed elevations are in substantial conformance with the appearance review guidelines. 431 00:40:29,470 --> 00:40:35,490 So, four-sided building, they're using primarily brick and stone throughout the all four sides 432 00:40:36,250 --> 00:40:42,930 and the colors are neutral in tone and they have also created some pedestrian-oriented 433 00:40:42,930 --> 00:40:44,070 elements as well. 434 00:40:46,340 --> 00:40:50,200 So next, I will go through some of the zoning related to the elevations. 435 00:40:51,180 --> 00:40:58,760 This is still the south or corner side facing Crescent, the elevation, so the average 436 00:40:58,760 --> 00:41:09,200 It is measured four points on the lots, and then the average of those four points as defined 437 00:41:09,200 --> 00:41:14,240 by the required setbacks and where the setbacks kind of intersect with the billing line. 438 00:41:15,120 --> 00:41:18,000 From that point, you measure for the height. 439 00:41:18,600 --> 00:41:24,820 So in the C-5B district, and because they have parking enclosed on the lower floor, 440 00:41:24,820 --> 00:41:31,600 they have a bonus height. So that's how they're permitted to have 60 feet. The 441 00:41:31,600 --> 00:41:39,140 roofline is just under 60 feet and then the parapet wall is 62 feet 3 inches. So 442 00:41:39,140 --> 00:41:45,180 you'll see that it's the elevator run that is creating the larger height 443 00:41:45,180 --> 00:41:46,280 deviation here. 444 00:41:49,320 --> 00:41:52,280 This is the an illustration of the deviations for 445 00:41:52,280 --> 00:42:00,580 height but from the facade facing Glenwood and per the zoning code the front lot line is the shortest 446 00:42:00,580 --> 00:42:06,780 lot line abutting public right-of-way which would be the Glenwood side so that's why this is considered 447 00:42:06,780 --> 00:42:11,100 the front facade even though it's less dominant because it's shorter. 448 00:42:14,630 --> 00:42:16,310 This kind of alludes to 449 00:42:16,310 --> 00:42:22,650 what I mentioned earlier regarding some changes in the design. Previously the building was right 450 00:42:22,650 --> 00:42:28,890 on the crescent lot line all the way up and now they've pushed the building itself back 451 00:42:28,890 --> 00:42:35,230 10 feet and expanded the outdoor space for the second floor and they also they've maintained 452 00:42:35,230 --> 00:42:42,710 this space on the north elevation for those second floor apartments as well. So there's 453 00:42:42,710 --> 00:42:49,910 a zero foot approximately zero foot setback proposed on the corner sideline along crescent. 454 00:42:53,330 --> 00:42:59,850 The other deviation related to height is the step back requirement. 455 00:43:00,550 --> 00:43:07,090 So in the C5B district, the parts of the building that are taller than 45 feet are required to 456 00:43:07,090 --> 00:43:09,210 be step back 15 feet. 457 00:43:12,010 --> 00:43:20,550 So again, this green line indicates the wall plane that's facing Glenwood, although you're 458 00:43:20,550 --> 00:43:27,650 looking at the crescent elevation here. So if you're looking north from crescent, the building 459 00:43:28,290 --> 00:43:33,450 is required to be stepped back along that yellow arrow. And so they're requesting a deviation 460 00:43:33,450 --> 00:43:37,450 to allow the building to continue all the way up. 461 00:43:41,040 --> 00:43:43,460 And then lastly, this is the north elevation, 462 00:43:44,120 --> 00:43:49,400 or second to last, this is the north elevation facing Brony's and Glen Oak Cafe. So just 463 00:43:49,400 --> 00:43:54,760 illustrating the same deviations, the average lot line, or average of the 464 00:43:54,760 --> 00:44:03,140 same grade. And finally, this is the elevation facing Lord's auto-quenant, 465 00:44:06,410 --> 00:44:06,650 so 466 00:44:06,650 --> 00:44:10,470 that this illustration does kind of show the grade change there. 467 00:44:14,140 --> 00:44:15,100 This is the 468 00:44:15,100 --> 00:44:21,000 landscape plan that's proposed, so they're proposing a combination of some 469 00:44:21,000 --> 00:44:24,780 and deciduous and coniferous shrubbery 470 00:44:24,780 --> 00:44:26,480 along the North Watt line here. 471 00:44:27,360 --> 00:44:30,760 And you're able to get back there if necessary 472 00:44:30,760 --> 00:44:31,740 through this gate. 473 00:44:33,620 --> 00:44:38,040 Then from Glenwood, this is the loading space. 474 00:44:38,280 --> 00:44:40,460 This is not required per the co, 475 00:44:40,600 --> 00:44:42,340 but because the commercial space 476 00:44:42,340 --> 00:44:44,420 is less than 5,000 square feet, 477 00:44:44,660 --> 00:44:46,840 they're providing that for the commercial space 478 00:44:46,840 --> 00:44:48,740 in addition for resident move-in. 479 00:44:49,880 --> 00:44:53,820 and this is one of this is a dog run that they're proposing for their 480 00:44:53,820 --> 00:44:58,500 residents and then immediately to the West they have their mechanical units in 481 00:44:58,500 --> 00:44:59,460 the emergency generator. 482 00:45:01,010 --> 00:45:09,390 There is a fence here that will screen the mechanical units from Glenwood if you're 483 00:45:09,390 --> 00:45:14,910 standing here and looking straight back. There is an existing retaining wall that's 484 00:45:14,910 --> 00:45:20,750 about one or two feet above grade on the east lot line. And then as you move 485 00:45:20,750 --> 00:45:28,290 west, they are proposing to extend it about 32 feet from the existing 486 00:45:28,290 --> 00:45:36,070 retaining wall and then the height of the retaining wall at this point is 11 feet and then the retaining 487 00:45:36,070 --> 00:45:44,710 wall will be extended and go to the building and they're surrounding all of the west lot line and 488 00:45:44,710 --> 00:45:51,270 the north lot line with an open five foot tall aluminum fence and then there's a four foot 489 00:45:51,270 --> 00:45:56,770 tall aluminum fence that's you're able to move it in case a vehicle to access this equipment 490 00:45:56,770 --> 00:46:00,870 needs to pull in, but it's a four-foot tall aluminum fence. 491 00:46:01,170 --> 00:46:02,630 And all the fencing is black. 492 00:46:06,690 --> 00:46:08,970 So now to take you inside the building, 493 00:46:09,330 --> 00:46:12,130 this is the lower level, the level to the low grade. 494 00:46:13,990 --> 00:46:17,410 The ramp to this level of the building 495 00:46:17,410 --> 00:46:21,150 is the eastern ramp closest to the southwest corner 496 00:46:21,150 --> 00:46:23,070 of the, southeast corner of the building. 497 00:46:24,190 --> 00:46:26,410 This area in yellow, I wanted to show 498 00:46:26,410 --> 00:46:28,950 one of the resident amenities. 499 00:46:28,950 --> 00:46:35,350 there's a pet spot for your pets down in the basement to give them a bath. Then 500 00:46:35,350 --> 00:46:40,430 you go into the parking. It's a counterclockwise circulation. There's 56 501 00:46:40,430 --> 00:46:48,390 stalls here and there is one compact stall. This is the one that requires the 502 00:46:48,390 --> 00:46:53,890 deviation from the minimum length requirement for 45 degree stalls. So 503 00:46:53,890 --> 00:46:58,410 they're requesting 16 feet 10 inches where 19 feet is required. 504 00:47:02,250 --> 00:47:03,670 So this is the 505 00:47:03,670 --> 00:47:10,350 at-grade floor plan. First to talk about the parking, the entrance is to the west 506 00:47:10,350 --> 00:47:19,290 over here. It is also counterclockwise and 48 spaces. This is the level with the 507 00:47:20,190 --> 00:47:25,110 ADA stalls over here that are required and they would go to the ramp and get 508 00:47:25,110 --> 00:47:33,330 to the elevator to enter the building. One of the configuration deviations is also in 509 00:47:33,330 --> 00:47:40,510 this area. So they're required to have 90 degree stalls are required of a 25 foot wide 510 00:47:40,510 --> 00:47:47,690 drive aisle. As you can see that stall doesn't quite have that distance straight down. 511 00:47:47,950 --> 00:47:50,490 So they're requesting a deviation for that. 512 00:47:53,380 --> 00:47:56,800 I wanted to go over the amenities on the 513 00:47:56,800 --> 00:48:03,100 ground floor. So the items in yellow, those are the amenities that are just for the residents. 514 00:48:03,420 --> 00:48:09,540 So there's a bicycle studio, a craft room, meeting room, business center, and then the 515 00:48:09,540 --> 00:48:14,820 mail and package room. The purple is the office space for the on-site management 516 00:48:14,820 --> 00:48:23,060 that will be there. And the green is the lobby, so a little more of a public space. 517 00:48:23,060 --> 00:48:26,560 and then the red is the proposed commercial space. 518 00:48:27,120 --> 00:48:30,240 So they're proposing 1,490 square feet of commercial. 519 00:48:30,920 --> 00:48:33,000 They mentioned earlier they, 520 00:48:33,140 --> 00:48:38,880 in May they were proposing 1,203 square feet, I believe. 521 00:48:40,990 --> 00:48:43,770 So before I go to the residential floors, 522 00:48:44,470 --> 00:48:47,370 the parking deviations in terms of number 523 00:48:47,370 --> 00:48:48,370 that are being requested, 524 00:48:48,950 --> 00:48:53,030 they're required to have 145 stalls for the residential 525 00:48:53,030 --> 00:48:56,250 and they're required to have six for the commercial. 526 00:48:56,790 --> 00:48:59,010 They're proposing a total of 104. 527 00:49:00,390 --> 00:49:04,410 The deviation that was listed in the public hearing notice 528 00:49:04,410 --> 00:49:09,030 and is included and suggested in the staff report 529 00:49:09,490 --> 00:49:12,450 is a deviation of 102. 530 00:49:13,090 --> 00:49:14,770 During the plan review process, 531 00:49:15,310 --> 00:49:18,350 staff has been coordinating with the engineer 532 00:49:18,350 --> 00:49:21,350 and architect to fit the ADA styles in. 533 00:49:21,350 --> 00:49:33,090 So, we felt that it would be best to leave any breathing room in the event, additional stalls are lost due to needing to accommodate the ADA requirements. 534 00:49:36,800 --> 00:49:41,100 So, the site plan, this is level one at grade. 535 00:49:42,160 --> 00:49:48,740 So, this slide was just the inside. This is showing the perimeter of the building. 536 00:49:48,740 --> 00:49:52,700 So I wanted to go through the setback requirements. 537 00:49:53,680 --> 00:49:59,700 A corner side yard setback deviation is needed on the required to have 39 feet, 6 inches. 538 00:50:00,420 --> 00:50:06,040 That is where the Lord's Auto Clinic is along Crescent. 539 00:50:06,500 --> 00:50:15,980 So in the C5B district, they're required to be at the lot line or they need to meet the setback of the adjacent building. 540 00:50:16,900 --> 00:50:22,520 This is a downtown, so it's not uncommon to have a zero-foot setback, but given the 541 00:50:22,520 --> 00:50:26,880 Lord's building, which is also not the front facade of Lord's. 542 00:50:26,880 --> 00:50:29,060 It's also one of Lord's corner sides. 543 00:50:29,750 --> 00:50:33,960 It's required to meet that setback, so they're requesting a deviation from that. 544 00:50:35,090 --> 00:50:42,860 They also need three impervious surface setback deviations from the northeast and south lot 545 00:50:42,860 --> 00:50:49,720 lines are proposing a zero foot impervious surface setback where five feet six inches is required. 546 00:50:50,460 --> 00:50:55,740 The emergency generator in between the north lot line and the north elevation 547 00:51:01,980 --> 00:51:02,660 is 548 00:51:06,050 --> 00:51:10,050 it's four feet seven inches where five feet six inches is required. 549 00:51:11,990 --> 00:51:18,830 Mechanical units which are the transformer and the switch gear for ComEd it's required to 550 00:51:18,830 --> 00:51:21,250 to be 11 feet and they're proposing three feet. 551 00:51:21,910 --> 00:51:24,170 And the petitioner has already been communicating 552 00:51:24,170 --> 00:51:28,010 with ComEd about their ability to access these here. 553 00:51:28,890 --> 00:51:30,770 So that is something they're able to do. 554 00:51:31,390 --> 00:51:33,670 We kind of flagged that early on 555 00:51:33,670 --> 00:51:37,050 and that's an okay location per ComEd. 556 00:51:40,560 --> 00:51:43,060 So again, just to highlight where these areas are 557 00:51:43,060 --> 00:51:44,820 and then the corner side yard setback 558 00:51:45,200 --> 00:51:48,120 is because Lourdes is located approximately here. 559 00:51:48,120 --> 00:51:49,160 So, 560 00:51:51,520 --> 00:51:58,280 the residential component, these are two of the typical one bed floor plans showing 561 00:51:58,280 --> 00:51:59,000 the balconies. 562 00:51:59,320 --> 00:52:04,340 So, one of the balconies kind of been projecting and then one of the inset balconies. 563 00:52:05,460 --> 00:52:13,560 So, the rents range and price from $1,440 to up to almost $2,900. 564 00:52:14,660 --> 00:52:23,820 They have junior one beds up to two beds plus dens with primarily one bed and two bed units. 565 00:52:25,840 --> 00:52:31,360 The petitioner will touch on the market study a little bit more in their presentation. 566 00:52:33,000 --> 00:52:36,380 This is the second floor. 567 00:52:38,650 --> 00:52:43,520 The second floor has the other remaining amenities for the residents. 568 00:52:44,520 --> 00:52:47,120 The fitness center is at the northeast corner. 569 00:52:47,440 --> 00:52:49,200 There's a club room at the southwest corner. 570 00:52:49,600 --> 00:52:54,520 Both of those amenities have balconies or the rooftop terrace feature. 571 00:52:55,260 --> 00:52:59,480 And then the yellow is the size of the balconies for each apartment. 572 00:52:59,480 --> 00:53:06,060 So every single unit on this floor does have its own kind of private outdoor space. 573 00:53:07,240 --> 00:53:10,340 The fitness center is about 950 square feet. 574 00:53:10,900 --> 00:53:17,040 The rooftop patio is 1330 square feet and the club room is 1113 square feet. 575 00:53:17,700 --> 00:53:21,520 There's 20 apartments on this floor. 576 00:53:22,560 --> 00:53:29,640 And then this slide is the remaining floors, so the third through fifth floors, the yellow 577 00:53:29,640 --> 00:53:31,940 or the private balconies for those apartments. 578 00:53:33,980 --> 00:53:36,520 And again, just kind of cover everything. 579 00:53:36,880 --> 00:53:42,140 We've got 86 of them apartments, and they're served by 104 parking stalls at this time. 580 00:53:42,740 --> 00:53:46,340 The relief for the parking count is no less than 102. 581 00:53:46,340 --> 00:53:46,700 two. 582 00:53:49,370 --> 00:53:54,610 So with that, they're requesting, again, a special use for the preliminary and final 583 00:53:54,610 --> 00:54:00,850 planning development with deviations, a special use permit for multi-family and exterior 584 00:54:00,850 --> 00:54:10,510 parents approval. So now the next few slides are a lot of text, but they're requesting 585 00:54:10,510 --> 00:54:19,210 3 deviations related to or 4 deviations related to parking. So, that's to allow the number 586 00:54:19,210 --> 00:54:26,050 of parking stalls where they're required to allow, they're required 151 total for both 587 00:54:26,050 --> 00:54:32,450 the commercial and residential. They're proposing 104. The relief cited in the public notice 588 00:54:32,450 --> 00:54:39,150 was 102 to allow one of the parking stalls to be compact stall at 16 feet 10 inches 589 00:54:39,150 --> 00:54:46,970 and then to allow a 14-foot dry vial for one of the 90-degree stalls. The setback deviations, 590 00:54:48,110 --> 00:54:55,290 they're to allow zero-foot setbacks from the corner side of our setback and then the northeast 591 00:54:55,290 --> 00:55:08,050 and south impervious surface setbacks. And finally, the four deviations for the building 592 00:55:08,050 --> 00:55:12,810 Building is proposed at 66 feet 8 inches. 593 00:55:13,450 --> 00:55:19,310 It was noticed it's approximately 67 feet, which to include the parapet walls, elevator 594 00:55:19,310 --> 00:55:26,230 overrun, HVAC units, mechanical units, any other rooftop structures, allow the front 595 00:55:26,230 --> 00:55:30,430 facade to not be stepped back where it's taller than 45 feet. 596 00:55:32,890 --> 00:55:36,530 This one I did not cover, but it is a deviation. 597 00:55:36,530 --> 00:55:45,760 They are requesting a maximum lock coverage of 84 percent where a lock coverage of 65 is permitted in accordance with the commercial plan U development standards. 598 00:55:48,010 --> 00:55:54,630 And then finally, the exterior light fixtures have exposed tops and sides where they're required to be shielded. 599 00:55:55,250 --> 00:56:05,010 So the light fixtures proposed that are long crescent and on the length of the crescent facade that kind of can share some of the up lighting. 600 00:56:05,010 --> 00:56:13,070 they require a deviation and so that's where those are coming from and they 601 00:56:13,070 --> 00:56:17,090 create that kind of lighting effect that has received some positive some 602 00:56:17,090 --> 00:56:18,510 positive mixed feedback. 603 00:56:21,330 --> 00:56:28,610 So lastly should the Commission elect to approve the 604 00:56:28,610 --> 00:56:36,850 requests. There are some conditions of approval. So the six on the screen are standard that 605 00:56:36,850 --> 00:56:44,190 we include with pretty much any new development. They need to construct the project in accordance 606 00:56:44,190 --> 00:56:49,970 with the plans that the plan commission and the village board review. They need to install 607 00:56:49,970 --> 00:56:55,230 and maintain the landscaping according to the landscape plan. They need to have a construction 608 00:56:55,230 --> 00:57:01,250 management plan that village staff reviews before they get issued a permit. They need to make sure 609 00:57:01,250 --> 00:57:07,510 all of the rooftop mechanical units are screened provided that doesn't go taller than the height 610 00:57:07,510 --> 00:57:15,790 deviation. If there's any temporary construction or any easements required that those be completed 611 00:57:15,790 --> 00:57:21,490 also before the issue of permits and then also that their plans are all consistent with one 612 00:57:21,490 --> 00:57:23,230 another when they submit for permit. 613 00:57:26,260 --> 00:57:29,180 Other conditions of approval are related 614 00:57:29,180 --> 00:57:34,740 to the developer coordinating with the village as the village pursues the 615 00:57:34,740 --> 00:57:40,680 streetscape improvements in the downtown. So as you may or may not be aware, the 616 00:57:40,680 --> 00:57:44,440 village is currently kind of reviewing the streetscape improvements in the 617 00:57:44,440 --> 00:57:48,180 downtown. So this is essentially that they need to coordinate, make sure the 618 00:57:48,180 --> 00:57:53,620 materials match that they put a bike rack in that matches the street's 619 00:57:53,620 --> 00:58:00,100 furniture the Village Board selects. They need to coordinate anything with the 620 00:58:00,100 --> 00:58:06,620 pickup drop-off area that they propose at the southwest southeast corner and 621 00:58:06,620 --> 00:58:10,640 that this is more of just so the petitioners are aware but that they 622 00:58:10,640 --> 00:58:14,480 need an outdoor cafe license agreement with the Village for the outdoor 623 00:58:14,480 --> 00:58:22,600 seeding along Glenwood. These are more unique to this development, not any development or 624 00:58:22,600 --> 00:58:30,420 development in the downtown. That's specifically that they need to just make sure their parking 625 00:58:30,420 --> 00:58:34,900 stalls are compliant with the Glen Island Code and then also the Illinois Accessibility Code, 626 00:58:35,500 --> 00:58:42,960 that they incorporate any additional design elements as the some additional design detail 627 00:58:42,960 --> 00:58:46,440 into their exterior appearance. 628 00:58:47,420 --> 00:58:49,600 There was a memo attached at the end 629 00:58:49,600 --> 00:58:51,220 of the meeting packet for tonight 630 00:58:52,040 --> 00:58:53,700 that summarized that feedback 631 00:58:53,700 --> 00:58:55,540 from the Glenn Allen Historical Society 632 00:58:55,540 --> 00:58:56,880 and Historic Preservation Commission. 633 00:58:58,100 --> 00:58:59,860 So it's my understanding, 634 00:59:00,040 --> 00:59:01,300 our understanding of petitioners hoping 635 00:59:01,300 --> 00:59:03,480 to receive some feedback and insight 636 00:59:03,480 --> 00:59:05,200 on what the plan commission or the public 637 00:59:05,200 --> 00:59:06,840 may think of some of those suggestions. 638 00:59:07,640 --> 00:59:11,320 And then finally, the total developer donations. 639 00:59:13,380 --> 00:59:23,680 With that, the plan commission can approve, approve with conditions or deny all the zoning relief being requested. 640 00:59:24,920 --> 00:59:30,620 So I'm done with my part of the presentation. Did anyone have any questions? 641 00:59:34,240 --> 00:59:37,160 Does anybody from the plan commission have questions for Katie? 642 00:59:40,780 --> 00:59:42,280 Can I just ask a quick one? 643 00:59:44,000 --> 00:59:56,640 Do you know what the, do we know what the highest, because the elevation drops, do you know how far does it drop? How many feet from the highest lowest point? 644 01:00:00,500 --> 01:00:06,700 Let me double check. I know it's around eight feet, but let me check the existing conditions plan. 645 01:00:07,080 --> 01:00:07,580 Okay. 646 01:00:11,270 --> 01:00:14,390 Does anybody else have a question for Katie while she's looking at that? 647 01:00:16,130 --> 01:00:21,910 Well, I just wanted to ask, you know, for the last six years and, you know, I think that 648 01:00:21,910 --> 01:00:26,690 lot's been used, right, the Disney lot that's been used for public parking. 649 01:00:27,870 --> 01:00:29,370 It's been allowed, right? 650 01:00:30,750 --> 01:00:41,350 allowed and used right yeah we as a village you know we have enough space that that's not really 651 01:00:41,350 --> 01:00:51,190 a concern right so um this was um we we entered into an arrangement with the property owner similar 652 01:00:51,190 --> 01:01:02,130 to what we did for the old pharmacy, Schmid's pharmacy, where two-hound red is located right now, 653 01:01:02,590 --> 01:01:07,950 and so we always try to take advantage of these opportunities when buildings are vacant to add 654 01:01:07,950 --> 01:01:15,650 additional parking above and beyond the parking that we have available. So this isn't generally 655 01:01:15,650 --> 01:01:20,870 considered part of the village's downtown parking inventory and we've really enjoyed and 656 01:01:20,870 --> 01:01:27,390 appreciated. They're allowing the public parking to take place while they're going 657 01:01:27,390 --> 01:01:33,250 through this approval process. But just to give you an update, the draft 658 01:01:33,250 --> 01:01:38,330 comprehensive plan, which our open house is coming up next week, and it will be 659 01:01:38,330 --> 01:01:44,270 coming before the plan commission for a public hearing, hopefully in for its 660 01:01:44,270 --> 01:01:49,890 first public hearing of three in the beginning of December, will have quite a 661 01:01:49,890 --> 01:01:54,810 information about parking available that will give a little bit of an inventory. 662 01:01:55,310 --> 01:02:02,730 But so to answer your question, Commissioner Rodman, I don't, this isn't something that we're actually 663 01:02:02,730 --> 01:02:06,930 losing. It's something we've had the benefit of using for a period of time. 664 01:02:10,160 --> 01:02:12,900 Thank you. Thank you, Stacey. Sure. 665 01:02:14,900 --> 01:02:18,620 I think Katie's going to have an answer to the question. Is that correct? 666 01:02:18,620 --> 01:02:25,000 as we're seeing here? Yes. So this is the existing conditions plan. I just wanted to 667 01:02:25,000 --> 01:02:35,680 pull it up. It looks like from 58 to 744, 45. So it's over a 10-foot drop, about 13-foot 668 01:02:35,680 --> 01:02:42,000 drop from the northwest corner to the southwest corner. And that's just on the lot itself. 669 01:02:44,700 --> 01:02:52,020 because I know there was, we had talked a little bit, there was from the Pennsylvania to the Crescent, 670 01:02:52,060 --> 01:02:57,060 what's the drop there? Because it would be greater. Do you have that on this? And if you don't, 671 01:02:57,080 --> 01:02:59,200 then don't go look it up. But I just thought you might have that. 672 01:03:00,960 --> 01:03:05,100 I know that they have, I think that's on. 673 01:03:05,100 --> 01:03:05,260 And 674 01:03:08,530 --> 01:03:19,550 as you're looking, Katie, you can confirm there's also currently, I believe, a retaining wall on the property line on the west side also, correct? 675 01:03:20,790 --> 01:03:24,450 Yes, and it is actually on board's property. 676 01:03:25,310 --> 01:03:30,490 Okay. Okay. But it's essentially on the property line. 677 01:03:31,030 --> 01:03:31,510 Correct. 678 01:03:32,030 --> 01:03:35,210 Correct. Okay. Yeah, I just wanted to be clear. Okay. Thank you. 679 01:03:38,320 --> 01:03:40,220 Any other questions for Katie? 680 01:03:41,880 --> 01:03:43,020 Katie, I have a quick question. 681 01:03:44,040 --> 01:03:44,220 Sure. 682 01:03:44,720 --> 01:03:45,480 Two, actually. 683 01:03:45,820 --> 01:03:47,500 First, with regards to the retail space, 684 01:03:47,820 --> 01:03:52,840 can you give me a comparable store or England that could fit into the space? 685 01:03:54,080 --> 01:03:54,340 Sure. 686 01:03:54,780 --> 01:03:58,060 So the beer seller actually is close to that. 687 01:03:58,940 --> 01:04:01,080 And so is Marche. 688 01:04:01,940 --> 01:04:06,800 Marche actually is even, it's the interior. 689 01:04:06,800 --> 01:04:13,800 is five the first floor is like 500 something square feet and then total is a thousand but 690 01:04:13,800 --> 01:04:21,720 that space is actually so it would fit there okay and then my other question the elevator overrun 691 01:04:21,720 --> 01:04:30,960 where in the building is that is it close to the like the edge of the middle it's in the middle 692 01:04:30,960 --> 01:04:36,120 of the building okay which would make it less obvious people on the street below correct 693 01:04:36,120 --> 01:04:38,780 Okay. Thank you. I 694 01:04:42,780 --> 01:04:55,320 wanted to note really quick the there's an elevation change from Pennsylvania Avenue to Crescent Boulevard, kind of from the northwest to the southeast. It's about seven 16 to 17 feet. 695 01:04:55,800 --> 01:05:01,940 Okay. Okay. Thank you. Thank you very much. Any other questions for I'll say staff at this point. 696 01:05:03,040 --> 01:05:08,800 from the plan commission and if not even Katie thank you very much I know that 697 01:05:08,800 --> 01:05:12,760 was a lot of detail so thank you very much for your presentation and 698 01:05:14,840 --> 01:05:16,680 so you're 699 01:05:16,680 --> 01:05:28,390 putting this back up because we're not okay and so I take it that now it's 700 01:05:28,390 --> 01:05:32,030 since there's no more questions for staff we can go on to the petitioners 701 01:05:32,030 --> 01:05:36,070 presentation so can we introduce the petitioners with your name and address 702 01:05:36,070 --> 01:05:37,650 and Barbara will swear you in. 703 01:05:39,430 --> 01:05:44,250 So, Chairman Locke, I have added Drew Mitchell, Chris Walsh, 704 01:05:44,830 --> 01:05:50,590 and Mike O'Connor to the screen to add them as panelists. 705 01:05:51,030 --> 01:05:52,850 And I'm going to turn it over to them. 706 01:05:53,630 --> 01:05:56,690 I would assume Drew Mitchell is going to start and kick it off. 707 01:05:57,450 --> 01:06:02,350 And Drew, please note that before we go too far, 708 01:06:02,530 --> 01:06:04,430 the three of you need to be sworn in. 709 01:06:04,430 --> 01:06:05,890 and so we should probably start with that. 710 01:06:06,410 --> 01:06:07,290 That'd be great. 711 01:06:07,450 --> 01:06:09,970 And actually, we've got Javier Milan, 712 01:06:10,570 --> 01:06:12,770 who's a consultant with KLOA, 713 01:06:13,210 --> 01:06:16,110 Trafficking Parking Consultant, who is also on. 714 01:06:16,410 --> 01:06:16,990 So, Javier- 715 01:06:16,990 --> 01:06:18,410 Okay, I can promote him. 716 01:06:18,790 --> 01:06:19,730 Okay, thank you. 717 01:06:20,110 --> 01:06:22,090 That's, promotions are easy here. 718 01:06:22,330 --> 01:06:22,650 Yeah. 719 01:06:23,870 --> 01:06:25,050 She's very generous. 720 01:06:26,030 --> 01:06:28,990 But the implication is that he also needs to be sworn in. 721 01:06:29,130 --> 01:06:32,150 So, Javier, you need to unmute and show yourself. 722 01:06:32,150 --> 01:06:35,350 All right, Barb, can you swear everybody in, please? 723 01:06:36,290 --> 01:06:37,510 Sure, shall we start with Mr. Mitchell? 724 01:06:39,310 --> 01:06:39,630 Sure. 725 01:06:40,630 --> 01:06:43,830 Actually, if you can all just state your name, 726 01:06:44,350 --> 01:06:47,510 your place of business and your address for the record, 727 01:06:47,510 --> 01:06:50,350 then she can swear you all in as a group at the end. 728 01:06:50,830 --> 01:06:50,970 Okay. 729 01:06:51,730 --> 01:06:53,370 Good evening, I'm Drew Mitchell. 730 01:06:53,590 --> 01:06:55,230 I'm a partner with Holiday Properties 731 01:06:55,230 --> 01:06:59,330 located at 324 West Burlington Avenue in LaGrange, Illinois. 732 01:06:59,330 --> 01:07:03,250 Mike, I think Mike would be next. 733 01:07:03,730 --> 01:07:04,430 Mike, you're muted. 734 01:07:04,730 --> 01:07:06,030 Maybe Chris, you can go first. 735 01:07:06,630 --> 01:07:08,910 Chris Walsh with Tandem Architecture, 736 01:07:09,530 --> 01:07:13,470 1040 West Huron Street in Chicago, Suite 300. 737 01:07:14,710 --> 01:07:16,270 Hi, I'm Javier Milan. 738 01:07:16,730 --> 01:07:19,070 I'm a principal with KLWA Incorporated, 739 01:07:20,050 --> 01:07:22,930 9575 West Higgins Road in Rosemont. 740 01:07:24,770 --> 01:07:25,990 And Mike, you're still muted. 741 01:07:28,620 --> 01:07:29,160 There you go. 742 01:07:31,840 --> 01:07:35,640 Mike, we can't, we see your mouth moving but can't hear you. 743 01:07:39,180 --> 01:07:40,960 Do we have a phone number for him? 744 01:07:41,640 --> 01:07:42,800 Stacey, you're also muted. 745 01:07:47,190 --> 01:07:53,450 Mike, shake your head, yes, to the last four digits of your phone number, N4261. 746 01:07:56,400 --> 01:07:58,620 Yes, okay, I'm going to promote your phone. 747 01:07:59,740 --> 01:08:00,300 Make 748 01:08:09,510 --> 01:08:11,130 sure that's correct, Stacey. 749 01:08:11,470 --> 01:08:13,050 I appreciate everybody's patience. 750 01:08:15,230 --> 01:08:16,390 We're all still learning. 751 01:08:17,230 --> 01:08:19,430 He's 398 sex, Stacey. 752 01:08:21,290 --> 01:08:24,950 Okay. I do not see his phone in here. 753 01:08:26,970 --> 01:08:26,970 So 754 01:08:29,500 --> 01:08:32,160 sure how to fix that. 755 01:08:33,860 --> 01:08:37,340 Well, Mike, you're not going to talk tonight. Congratulations. 756 01:08:38,960 --> 01:08:41,120 Unless you can figure out how to unmute yourself. 757 01:08:41,660 --> 01:08:43,440 We got it. It's okay. 758 01:08:44,040 --> 01:08:44,340 Okay. 759 01:08:44,340 --> 01:08:48,820 well roll with that and maybe you can still raise your hand and nod I don't 760 01:08:48,820 --> 01:08:55,260 know if that works but very good well before we you start let's let Barb 761 01:08:55,260 --> 01:09:01,540 swear you in thank you mr. Mitchell do you would you swear to tell the truth the 762 01:09:01,540 --> 01:09:08,880 whole truth and nothing but the truth I do mr. Walsh you swear to tell the 763 01:09:08,880 --> 01:09:15,820 truth the whole truth and nothing but the truth. I do. Mr. Milan, do you swear to 764 01:09:15,820 --> 01:09:21,060 truth the whole truth and nothing but the truth? I do. And are we going to 765 01:09:21,060 --> 01:09:22,820 attempt to swear in Mr. O'Panner? 766 01:09:25,280 --> 01:09:27,580 I think he's trying to call in based on 767 01:09:27,580 --> 01:09:32,620 what I'm seeing and his actions. So if he gets that done we can bring him in 768 01:09:32,620 --> 01:09:37,200 in the middle of the meeting then. Yes. All right well go ahead Mr. Mitchell 769 01:09:37,200 --> 01:09:38,700 to why don't we go ahead and get started. 770 01:09:39,240 --> 01:09:39,420 Thank you. 771 01:09:40,200 --> 01:09:42,360 Thank you, Chair Burris and Locke. 772 01:09:42,360 --> 01:09:45,500 I wanna start by thanking everybody for the opportunity 773 01:09:45,820 --> 01:09:48,340 to come in for the pre-application meeting in May. 774 01:09:48,500 --> 01:09:50,020 Not all communities do that. 775 01:09:50,700 --> 01:09:52,980 We found it to be tremendously helpful 776 01:09:52,980 --> 01:09:55,160 as an opportunity to get some early feedback. 777 01:09:55,800 --> 01:09:58,600 And in some cases, free feedback, 778 01:09:59,640 --> 01:10:01,600 not everything, all the comments 779 01:10:01,600 --> 01:10:04,440 that we received were necessarily positive, 780 01:10:04,440 --> 01:10:15,860 But, but it doesn't mean that they weren't important. So I think, you know, I would like to thank the planning staff at Glen Ellen, they've worked really, really hard. 781 01:10:16,120 --> 01:10:31,460 There was a 400 page package on this Katie, you did a really good job, probably making my, what I need to say this evening a little bit shorter but there have been a variety of different important modifications to this site. 782 01:10:31,460 --> 01:10:34,980 I think we're left with the dramatically improved product. 783 01:10:35,640 --> 01:10:39,520 I think we definitely have worked hard to address 784 01:10:39,520 --> 01:10:43,840 this concept of 360 degree architecture 785 01:10:44,320 --> 01:10:45,240 around the building. 786 01:10:46,200 --> 01:10:47,760 Another thing that's happened is, 787 01:10:48,000 --> 01:10:50,420 we've had an opportunity to really engage 788 01:10:50,420 --> 01:10:52,240 with some of the preservation folks. 789 01:10:52,820 --> 01:10:57,220 And when we build a project like this in a community, 790 01:10:58,140 --> 01:11:01,900 we're never trying to take it over. 791 01:11:02,060 --> 01:11:04,280 We wanted to fit within the community. 792 01:11:04,440 --> 01:11:07,880 We hope it's transformative from an economic standpoint 793 01:11:07,880 --> 01:11:10,320 and introduces additional disposable income. 794 01:11:10,680 --> 01:11:13,080 But we also wanted to be elegant 795 01:11:13,080 --> 01:11:14,920 and fit within the fabric. 796 01:11:15,580 --> 01:11:18,640 So to that end, we've really tried to incorporate 797 01:11:18,640 --> 01:11:21,480 some ideas and pay homage to the history 798 01:11:21,480 --> 01:11:22,580 of this important site. 799 01:11:23,100 --> 01:11:25,920 As Katie mentioned, the site has been vacant for six years. 800 01:11:25,920 --> 01:11:28,180 There's, it is not an easy sight to develop. 801 01:11:28,360 --> 01:11:31,500 There's topography challenges, you know, 802 01:11:31,780 --> 01:11:34,080 there's, it's expensive by the way. 803 01:11:34,420 --> 01:11:37,140 And so we've been working really hard. 804 01:11:37,380 --> 01:11:39,780 And while we're eager for your feedback, 805 01:11:39,940 --> 01:11:43,040 I hope that you're pleased with what you're seeing 806 01:11:43,040 --> 01:11:44,280 so far this evening. 807 01:11:45,940 --> 01:11:48,680 As I mentioned, our team, we've got Mike O'Connor 808 01:11:48,680 --> 01:11:51,180 with us, he and I work very closely together 809 01:11:51,820 --> 01:11:54,280 on the development side, putting these projects together. 810 01:11:54,280 --> 01:11:56,660 Chris Walsh is with Tandem Architecture, 811 01:11:57,500 --> 01:11:59,880 one of my favorite architecture groups in Chicago. 812 01:12:00,240 --> 01:12:02,120 They're terrific at this type of product 813 01:12:02,120 --> 01:12:06,880 and tasteful suburban downtown transit area and development. 814 01:12:07,380 --> 01:12:09,980 And then we've got Javier Milan with KLOA. 815 01:12:10,400 --> 01:12:11,940 And his role is really critical 816 01:12:11,940 --> 01:12:14,240 because having the right amount of parking 817 01:12:14,240 --> 01:12:17,400 in a project like this is absolutely paramount. 818 01:12:17,920 --> 01:12:22,180 So I think with that, I'm going to be weighing in 819 01:12:22,180 --> 01:12:27,320 is Chris is giving the presentation on certain important topics but at this 820 01:12:27,320 --> 01:12:32,940 point in time if it works the way I hope it does Chris will be able to share his 821 01:12:32,940 --> 01:12:37,680 screen and put up a presentation from from our team. 822 01:12:39,820 --> 01:12:42,020 Everyone see that? Yes. 823 01:12:42,640 --> 01:12:43,040 Okay. 824 01:12:47,400 --> 01:12:51,280 Alright, so Drew, if you're all done, I will start in. 825 01:12:53,860 --> 01:12:58,380 I will have to tailor my talking as well. 826 01:12:58,740 --> 01:13:08,220 So I don't want to go over a lot of things that Katie already went over, but you know, we'll do our best to cover what we have there are a few things we do want to make sure we point out. 827 01:13:08,220 --> 01:13:14,240 Because like Drew said, we have been working with staff and with different people in the 828 01:13:14,240 --> 01:13:16,040 village to get to this point. 829 01:13:16,340 --> 01:13:20,160 So this has definitely been a team effort to get here. 830 01:13:20,300 --> 01:13:25,620 Like Drew said, it's not always the easiest to hear certain comments, but I think we've 831 01:13:25,620 --> 01:13:26,400 taken them to heart. 832 01:13:26,740 --> 01:13:32,920 And I completely think we've got a great product here, a lot better than what we 833 01:13:32,920 --> 01:13:35,960 started with, and hopefully you'll feel the same way. 834 01:13:35,960 --> 01:13:46,340 Okay, so the building square footage is about 145,000 square feet, about 80,000 square feet of leasable. 835 01:13:47,020 --> 01:13:55,860 As Katie mentioned, it's 86 units, about almost 1500 square feet of retail and 104 parking spaces. 836 01:13:57,300 --> 01:14:02,640 Just to give you a quick kind of overall view of you can see how the building functions. 837 01:14:03,520 --> 01:14:05,620 Yellow is the corridor down the middle. 838 01:14:07,380 --> 01:14:09,640 Different colors are different unit sizes. 839 01:14:10,300 --> 01:14:16,640 A lot of the larger units are along the south facing street facing Crescent. 840 01:14:17,560 --> 01:14:22,820 And this gives you a little better idea of how we shifted the building back and 841 01:14:23,660 --> 01:14:33,360 really created a special space just above the sidewalk for all of the tenants at the second floor, which get a 10 foot wide veranda that's the width of their unit. 842 01:14:34,100 --> 01:14:35,940 There aren't many places like that. 843 01:14:36,900 --> 01:14:47,680 Chris, this is Stacy. I'm just wondering if you're able to pop that into some sort of presentation mode to make it larger on the screen for everybody who's looking. 844 01:14:48,080 --> 01:14:48,900 Is it too small. 845 01:14:49,480 --> 01:14:57,440 Yeah, it's a little too small. I didn't know if you could pop into full screen presentation mode with the slides. If not, if you could zoom in as appropriate. 846 01:14:58,140 --> 01:14:59,840 Maybe I'll do Chris go to the. 847 01:15:00,000 --> 01:15:09,060 You, at the top, in your, up, what, there, and you may have, just above the save disc. 848 01:15:11,360 --> 01:15:13,280 There, there. Yeah, I know. 849 01:15:13,520 --> 01:15:15,240 There's an offer to do a better. 850 01:15:15,420 --> 01:15:15,980 A little better. 851 01:15:18,670 --> 01:15:24,890 Okay, just, just keep in mind that it's really small on people's screens. So you just might need to zoom in as you're pointing. 852 01:15:25,350 --> 01:15:25,750 Okay, no problem. 853 01:15:27,050 --> 01:15:33,330 Chris, while you're zooming in, I just want to comment quickly on the way that we approach 854 01:15:33,330 --> 01:15:38,190 unit mixes and how we really try to define the different units in the building. 855 01:15:39,110 --> 01:15:44,410 So this isn't just two or three different unit types. 856 01:15:44,770 --> 01:15:50,990 We really study the market and when we do that, we hire, we have a market study 857 01:15:50,990 --> 01:15:57,650 consultant. We really like to work with Tracy Cross and associates, but they help us figure out 858 01:15:57,650 --> 01:16:02,910 exactly who the demographic is of who's going to be living here. And so we've actually got 12 859 01:16:02,910 --> 01:16:10,070 different unit types in this building, and there's various step-ups as you kind of work from a studio 860 01:16:10,070 --> 01:16:15,650 to a two bedroom plus den. And so one of the things that this is designed to do is make this 861 01:16:15,650 --> 01:16:18,790 building is attractive to as wide of a variety of potential 862 01:16:18,790 --> 01:16:23,450 people as possible. And so, you know, Katie mentioned, for 863 01:16:23,450 --> 01:16:27,890 example, starting rents at 1450 a month, which would qualify as 864 01:16:27,890 --> 01:16:31,110 workforce housing along with the significant proportion of the 865 01:16:31,110 --> 01:16:34,170 units in the building, all the way up to our largest two 866 01:16:34,170 --> 01:16:40,470 bedroom, two bath plus 10. And so it's really, you know, 867 01:16:40,470 --> 01:16:47,190 designed to conform with not just the surrounding character of buildings but 868 01:16:47,190 --> 01:16:51,430 promote different price points to address financial needs of seniors, young 869 01:16:51,430 --> 01:16:55,430 professionals, new families, etc. So that's pulled from one of the comments 870 01:16:55,430 --> 01:16:59,230 that we received from the League of Women Voters. But we take that very 871 01:16:59,230 --> 01:17:05,150 seriously of providing a wide variety of unit types in the building. And so 872 01:17:05,150 --> 01:17:09,750 each of the units are stacked as you work up the building. So it does, aside 873 01:17:09,750 --> 01:17:14,510 from the second floor which which features a terrace they're they're virtually identical as you move 874 01:17:14,510 --> 01:17:21,950 vertically in the building yeah so just like I was saying there is a terrace along the south side 875 01:17:21,950 --> 01:17:31,510 that's 10 foot deep we've placed the the club the club area is on the north corner or I'm sorry 876 01:17:31,510 --> 01:17:38,910 the the southeast corner and the fitness would be on the northeast corner and these came through 877 01:17:38,910 --> 01:17:44,610 comments that the village really wanted to enliven the street as much as possible so we've kept as 878 01:17:44,610 --> 01:17:50,290 much of the public spaces as we could close to the street as you'll see in the elevations. 879 01:17:51,430 --> 01:17:57,070 What we tried to do is really get spaces where people are going to be outside having a drink, 880 01:17:57,270 --> 01:18:02,910 sitting by a fire, talking, and it really enlivens the street is what we found on other projects. 881 01:18:02,910 --> 01:18:09,070 Yeah, the idea is to to put busier areas of the building along the more prominent corners 882 01:18:09,070 --> 01:18:14,670 and we as we're to activate but we're trying to activate that pedestrian level so it feels 883 01:18:14,670 --> 01:18:20,730 lively and it feels vibrant and then we carry that up onto the second floor in terms of 884 01:18:20,730 --> 01:18:22,230 the fitness in the club room area. 885 01:18:22,490 --> 01:18:28,130 So it's it's just part of the way that we approach these types of projects. 886 01:18:30,660 --> 01:18:38,820 So, another point that we, you know, was given to us by some comments was to bring the door 887 01:18:38,820 --> 01:18:44,140 to the corner of the building to really kind of bring people all the way down to the corner. 888 01:18:44,260 --> 01:18:46,360 We used to have it up a little bit farther on Glenwood. 889 01:18:46,760 --> 01:18:49,480 There really was no cause for people to kind of walk down the street. 890 01:18:50,380 --> 01:18:56,420 So we turn the, we click the corner into the lobby and I think we're going to have 891 01:18:56,420 --> 01:19:04,020 really nice dramatic lobby that steps up as you walk in. And then you can go back towards 892 01:19:04,020 --> 01:19:09,600 the elevators, the business center, meeting rooms, and bicycle rooms. And having the retail 893 01:19:09,600 --> 01:19:13,800 also facing Glenwood was something that we went back and forth on, and this ultimately 894 01:19:13,800 --> 01:19:21,340 we felt was the better place for it. What we did do, and I think Katie's tried to 895 01:19:21,340 --> 01:19:27,300 show this, but on Glenwood, what we actually did instead of having that step back that 896 01:19:27,300 --> 01:19:33,840 she talked about up at 45 feet, three step back 15 feet, we actually thought it was a 897 01:19:33,840 --> 01:19:39,080 better idea just to push the whole building back five feet, give the sidewalk back to 898 01:19:39,080 --> 01:19:39,940 the village. 899 01:19:40,660 --> 01:19:46,680 And so we have really a much wider sidewalk about 11 feet or so instead of just a five 900 01:19:46,680 --> 01:19:47,300 foot sidewalk. 901 01:19:47,300 --> 01:19:55,440 So it creates a nice plaza area at the southeast corner with the 45 degree angle on on the doors. 902 01:19:55,760 --> 01:20:05,140 So, you know, things like pedestrian sense of safety and, you know, just the general feel from the street is important. 903 01:20:05,700 --> 01:20:10,200 So Chris, may I talk briefly about the amenities and sure for there. 904 01:20:10,200 --> 01:20:13,620 So the experience that we're trying to deliver 905 01:20:13,620 --> 01:20:17,140 in a project like this is a hotel style lobby, 906 01:20:17,240 --> 01:20:20,040 almost a concierge sort of feel with the leasing office. 907 01:20:20,480 --> 01:20:23,660 We have automated package notification 908 01:20:23,660 --> 01:20:25,320 in the building, for example. 909 01:20:25,800 --> 01:20:27,840 We started incorporating a business center. 910 01:20:28,320 --> 01:20:30,680 Part of that is a lot more people are working from home. 911 01:20:31,080 --> 01:20:32,700 So when we first met with you in May, 912 01:20:32,780 --> 01:20:35,200 it was my first Zoom public hearing ever. 913 01:20:35,840 --> 01:20:39,100 And we all thought or were hoping we wouldn't, 914 01:20:39,100 --> 01:20:40,280 It would be done. 915 01:20:40,480 --> 01:20:43,760 But as this has become more part of our world, 916 01:20:44,060 --> 01:20:48,160 we've been pivoting and trying to make modifications 917 01:20:48,160 --> 01:20:50,660 and accommodations due to changing lifestyle. 918 01:20:51,460 --> 01:20:53,540 So another is just the craft room. 919 01:20:53,720 --> 01:20:56,240 And the concept here is that you've got a lot 920 01:20:56,240 --> 01:20:58,480 of empty nesters that'll be living in the building 921 01:20:58,480 --> 01:21:01,700 who may have a hobby or maybe their grandson wants 922 01:21:01,700 --> 01:21:03,560 to come and make a Pinewood Derby car. 923 01:21:03,820 --> 01:21:05,700 They've moved, they've downsized and moved out 924 01:21:05,700 --> 01:21:07,300 of a big house with all their tools. 925 01:21:07,300 --> 01:21:14,320 So this is a place where you can paint or work on a project and we have tools that are in the building and there's a meeting room 926 01:21:14,320 --> 01:21:19,580 So if you want to hold a small, you know six person gathering for a business meeting 927 01:21:19,580 --> 01:21:21,460 You're able to do that in the building 928 01:21:21,460 --> 01:21:29,340 Another thing that we've experienced in these transit-oriented developments is just a really high utilization of bicycles by our residents 929 01:21:29,340 --> 01:21:30,820 So we incorporate 930 01:21:30,820 --> 01:21:36,180 bicycle tools that are that are accessible to anybody tire inflation you 931 01:21:36,180 --> 01:21:41,540 can safely secure your bike in the bicycle studio and it's just it's 932 01:21:41,540 --> 01:21:49,180 something that we do so thank you Chris sure so just a few of the other things 933 01:21:49,180 --> 01:21:53,800 that we've incorporated we've we did create an alley towards the back of 934 01:21:53,800 --> 01:21:57,240 the building we felt this is important to really get those moving 935 01:21:57,240 --> 01:22:04,340 trucks off of the alley giving people somewhere where they could just park, unload, move into the 936 01:22:04,340 --> 01:22:10,860 unit. Also there is a small garbage area for the retail, so the garbage truck for that can 937 01:22:10,860 --> 01:22:19,120 actually pull in there. A dog run back here, which really becomes private as Katie was saying, 938 01:22:19,460 --> 01:22:25,200 this retaining wall, if you've been noted the site on the north side, climbs up to about 11 939 01:22:25,200 --> 01:22:31,200 feet so you know barking dogs and that are actually going to be below grade to 940 01:22:31,200 --> 01:22:35,660 the neighbor here and at the same time we've put the generator the 941 01:22:35,660 --> 01:22:41,960 transformers and everything tucked behind the dog area so again you know 942 01:22:41,960 --> 01:22:47,580 these normally ugly things that everyone sees at grade are going to be 943 01:22:47,580 --> 01:22:52,180 below grade below eyesight line the other thing I'll point out is the 944 01:22:52,180 --> 01:22:58,500 trash. This is usually a question, but Drew, maybe you want to talk about how you handle 945 01:22:58,500 --> 01:23:04,220 the trash removal? Yeah, so a lot of times what developers do is they'll kind of cheat 946 01:23:04,220 --> 01:23:09,700 in this area. So for example, you have a single trash shoot for trash, but they really forget 947 01:23:09,700 --> 01:23:15,160 about recycling or accommodating dual trash shoots for recycling and for trash. There 948 01:23:15,160 --> 01:23:19,620 are compactors in this space, which allows us to more efficiently work with the refuse. 949 01:23:19,620 --> 01:23:24,480 and then it's, believe it or not, very organized in terms of how that's removed 950 01:23:24,480 --> 01:23:29,380 from the building. We work with a local waste management group and they'll come 951 01:23:29,380 --> 01:23:33,740 in. It's typically at the beginning of the project once a week, it usually works 952 01:23:33,740 --> 01:23:37,620 its way up to twice a week and we try to remove that trash, you know, between 953 01:23:37,620 --> 01:23:42,480 9 and 11 in the morning on like a, you know, a Monday and a Thursday, so 954 01:23:42,480 --> 01:23:48,360 that we're not interrupting any morning commute. But you can't forget 955 01:23:48,360 --> 01:23:55,540 about trash management it happens a lot and then it's too late to fix it. So we are not going to make 956 01:23:55,540 --> 01:24:00,920 we aren't making that mistake and I think it's properly provisioned. Chris is it you know another 957 01:24:00,920 --> 01:24:06,500 really important thing to talk about is parking and how we approach parking and quantify our need 958 01:24:06,500 --> 01:24:12,480 there. Is this a good time to talk about that or should I return to that? Give me one second 959 01:24:12,480 --> 01:24:18,500 let me just point out a couple things. So the street I just want to point out on Crescent, 960 01:24:18,880 --> 01:24:25,480 what we're doing, we've created a drop-off area. This was another comment through working with 961 01:24:25,480 --> 01:24:31,280 the review process. We thought that was great. It's not meant for somebody to park their car 962 01:24:31,280 --> 01:24:36,420 and leave it there for an hour or two. This is meant for the dry cleaner, the pizza person, 963 01:24:36,420 --> 01:24:42,300 someone to jump out, you know, let someone off and then keep driving. This 964 01:24:42,300 --> 01:24:48,760 sidewalk actually was also widened or will be. Right now what's happening, if 965 01:24:48,760 --> 01:24:54,600 you see this little indent at the drop-off now, this is actually happening 966 01:24:54,600 --> 01:24:59,820 all the way down Crescent currently. So the sidewalk right now is only about 967 01:24:59,820 --> 01:25:04,840 five feet from the lot line to those indents. What Holiday would do is 968 01:25:04,840 --> 01:25:10,620 actually give that sidewalk back to the village and plant trees along that 969 01:25:10,620 --> 01:25:20,180 street line. And then before I let you go, what we have is two entrances to the 970 01:25:20,180 --> 01:25:24,420 building. We've taken advantage of the site. There is about a six-foot slope 971 01:25:24,420 --> 01:25:29,540 from the front door all the way to the west side just along Crescent and we've 972 01:25:29,540 --> 01:25:32,780 taking advantage of that by having two separate parking levels. 973 01:25:34,200 --> 01:25:38,200 So you'd enter one on the west side and one on the east side. 974 01:25:38,920 --> 01:25:43,520 And we did have to, or one of the requests 975 01:25:43,520 --> 01:25:47,080 was to recess the garage doors, which we have done. 976 01:25:47,360 --> 01:25:49,560 I'll let Drew talk about parking. 977 01:25:50,300 --> 01:25:51,280 Thank you, Chris. 978 01:25:51,900 --> 01:25:55,000 So parking's a huge deal on a building like this, 979 01:25:55,100 --> 01:25:58,520 how it's managed, trends, what we're seeing in the world. 980 01:25:58,520 --> 01:26:04,320 here's the worst thing that can happen for a building like this. You don't, you build it and you 981 01:26:04,320 --> 01:26:09,280 don't have enough parking. And the reason why is because these things are actually really fragile. 982 01:26:09,560 --> 01:26:14,940 They're hard to work economically, particularly at the beginning of a project. And if you don't 983 01:26:14,940 --> 01:26:20,260 have enough parking, what happens? You can't lease your last two or three or six or eight 984 01:26:20,260 --> 01:26:30,380 units and it becomes, it's not viable essentially. So we paid very, very close attention to parking 985 01:26:30,380 --> 01:26:36,280 needs. They don't always actually match up perfectly to ordinances and a lot of times ordinances are 986 01:26:36,280 --> 01:26:42,060 written particularly in whistle stop suburban Chicago communities to address the whole community 987 01:26:42,060 --> 01:26:46,520 and not necessarily a development that is for example right next to a train station. 988 01:26:46,520 --> 01:26:50,120 So here's what we've learned and what we know. 989 01:26:51,300 --> 01:26:53,520 We typically think about it this way. 990 01:26:53,780 --> 01:26:59,040 Between a studio and a two-bedroom, we need about one parking spot per unit. 991 01:26:59,220 --> 01:27:03,520 About a third of our units have no parking, about a third of our units have one car, 992 01:27:03,720 --> 01:27:06,280 and about a third of our units require two cars. 993 01:27:06,800 --> 01:27:09,060 And so when you average that out, it's one per unit. 994 01:27:10,780 --> 01:27:19,000 However, that doesn't give us enough comfort between what we believe our need is and, you know, breathing room, if you will. 995 01:27:19,300 --> 01:27:28,720 So we're proposing 1.2 to 1 parking ratio here. One of the things that we can do is try to limit or mitigate demand for parking. 996 01:27:28,920 --> 01:27:36,400 And I'll give you an example. I'm an empty nester. I'm downsizing. I don't, you know, want to take care of the big home anymore. 997 01:27:36,400 --> 01:27:40,280 I've got two cars and I would like to live in this building. 998 01:27:40,580 --> 01:27:43,220 We're going to try to encourage you to have one vehicle. 999 01:27:43,600 --> 01:27:47,360 And the way that we do that is by offering a concept called Envoy. 1000 01:27:47,480 --> 01:27:49,140 And I believe I shared that with you in May, 1001 01:27:49,200 --> 01:27:53,240 but for people who haven't heard us discuss this, I'll describe it briefly, 1002 01:27:53,320 --> 01:27:55,640 but it's an electric vehicle car sharing program. 1003 01:27:56,060 --> 01:28:00,100 And so anybody in the building can utilize this vehicle at any point in time. 1004 01:28:00,320 --> 01:28:01,440 You can check it out. 1005 01:28:01,600 --> 01:28:03,260 You can reserve it for a week out. 1006 01:28:03,260 --> 01:28:06,920 I think it's like eight bucks an hour or $30 a day. 1007 01:28:07,140 --> 01:28:09,860 But it's designed to encourage people to ditch their car 1008 01:28:10,290 --> 01:28:12,060 and also give them the flexibility 1009 01:28:12,060 --> 01:28:14,920 should they want to eliminate the need for a second vehicle. 1010 01:28:15,080 --> 01:28:17,660 Now they have a reliable backup plan 1011 01:28:18,110 --> 01:28:19,600 if dad's using the car 1012 01:28:19,600 --> 01:28:23,320 and mom wants to go run errands or something. 1013 01:28:23,640 --> 01:28:25,540 So we've done this at other projects. 1014 01:28:25,680 --> 01:28:28,160 It's been very successful at our downers growth project, 1015 01:28:28,160 --> 01:28:31,720 which by the way is a 1.2 to one parking ratio 1016 01:28:31,720 --> 01:28:34,660 and has been a healthy amount of parking 1017 01:28:34,660 --> 01:28:39,120 for similarly sized project 89 units versus 86 1018 01:28:40,000 --> 01:28:41,740 as well as similar unit mix. 1019 01:28:42,460 --> 01:28:45,580 So while I realized that it would appear 1020 01:28:45,580 --> 01:28:50,180 that there's significant reduction in parking need, 1021 01:28:50,280 --> 01:28:52,680 I think it's logical just due to its location 1022 01:28:53,300 --> 01:28:54,860 as a transitory and development 1023 01:28:54,860 --> 01:28:56,980 and also our experience in this space 1024 01:28:56,980 --> 01:28:59,740 and our desire to not really goof up a development 1025 01:28:59,740 --> 01:29:02,000 by having insufficient parking. 1026 01:29:02,600 --> 01:29:04,960 I'm going to invite Javier briefly 1027 01:29:04,960 --> 01:29:07,900 to, if you'd like to add anything to that, Javier, 1028 01:29:08,000 --> 01:29:09,880 I know you're going to tell us, you know, 1029 01:29:09,940 --> 01:29:13,800 what parking utilization is within proximity 1030 01:29:13,800 --> 01:29:16,120 of train stations that could be helpful. 1031 01:29:16,600 --> 01:29:18,200 Let, do you like to add anything? 1032 01:29:18,920 --> 01:29:21,060 Yes, you cover a lot of the issues, 1033 01:29:21,060 --> 01:29:24,340 but as Drew mentioned, the parking ratio 1034 01:29:24,340 --> 01:29:26,580 being provided at 1.2 spaces per unit. 1035 01:29:27,320 --> 01:29:33,340 It is a TOD development, meaning a transit-oriented development, and parking demand or parking 1036 01:29:33,340 --> 01:29:39,600 requirements of TOD developments are much lower than parking demand of developments not located 1037 01:29:39,600 --> 01:29:46,280 within close proximity to public transportation. This has been proven in many cases, and there's 1038 01:29:46,280 --> 01:29:50,820 a study prepared by the Federal Transit Administration and the Transportation Research Board 1039 01:29:50,820 --> 01:29:56,500 that indicated that TOD residents are almost twice as likely to not own a car 1040 01:29:56,500 --> 01:29:59,880 and own half the number of cars of other households. 1041 01:30:01,100 --> 01:30:11,540 Besides getting all that data and looking at it, we decided to look into three different data providers. The first one would be the census data. 1042 01:30:12,260 --> 01:30:24,720 What does the Glenn-Ellen census data show? The auto ownership of owned homes in Glenn-Ellen within a quarter mile of the Glenn-Ellen train station is 1.87 vehicles per owned household. 1043 01:30:25,340 --> 01:30:32,440 rental units within a quarter mile of the train station in Glen Elling, it's 0.95 automobiles per unit. 1044 01:30:33,300 --> 01:30:41,540 And then approximately 58% of the households within a quarter mile of the train station in Glen Elling have one or no vehicles at all. 1045 01:30:42,840 --> 01:30:48,000 Besides the census data, we also look at ITE, which stands for the Institute of Transportation Engineers, 1046 01:30:48,780 --> 01:30:51,040 and we looked at their parking generation manual. 1047 01:30:51,040 --> 01:30:55,760 It's a compilation of numerous surveys of different land uses to see what would be the 1048 01:30:55,760 --> 01:31:01,860 actual parking demand of this development. Based on all of those surveys, IT indicates 1049 01:31:01,860 --> 01:31:07,040 that the parking demand for this development would be 74 parked vehicles on a weekday 1050 01:31:07,040 --> 01:31:13,960 and 99 vehicles on a Saturday. Then lastly, we looked at what is the trend or what is 1051 01:31:13,960 --> 01:31:19,420 happening in the area. We have done numerous surveys and numerous studies of apartment 1052 01:31:19,420 --> 01:31:26,040 developments within the Chicago land area. Many saw works in the Chicago land area and the proposed 1053 01:31:26,040 --> 01:31:32,360 number of parking spaces of 1.2 is consistent with what has been approved in all of these 1054 01:31:32,360 --> 01:31:37,480 developments in the Chicago land area which ranges between 1.2 and 1.25 spaces per unit. 1055 01:31:38,060 --> 01:31:43,060 For all of those reasons that I mentioned above, we believe the number of parking spaces will be 1056 01:31:43,060 --> 01:31:46,200 adequate to accommodate the parking demand of these developments. 1057 01:31:46,200 --> 01:31:58,760 Thank you, Javier. One other thing that we typically do too is we provide electric vehicle charging stations. We'd be crazy to not realize that there is a trend towards more electric vehicles. 1058 01:31:59,240 --> 01:32:09,060 We typically include, there's several there up front. We'd like to locate the pedestal chargers to be able to maximize the number of spaces that they can reach. 1059 01:32:09,060 --> 01:32:13,080 And then we often place conduit or sleeves 1060 01:32:13,080 --> 01:32:17,060 so that we can add additional electric vehicle stations 1061 01:32:17,060 --> 01:32:19,480 as behavior and trends change over time. 1062 01:32:20,400 --> 01:32:25,920 So I think that's probably it. 1063 01:32:26,180 --> 01:32:29,660 I don't know that we need to address traffic necessarily here 1064 01:32:29,660 --> 01:32:32,340 but I guess what I would say is there's a misconception 1065 01:32:32,620 --> 01:32:33,780 on these types of buildings 1066 01:32:33,780 --> 01:32:35,420 that they generate a ton of traffic. 1067 01:32:35,800 --> 01:32:36,840 They really don't. 1068 01:32:36,840 --> 01:32:41,980 First of all, a lot of times they're walking, you know, they're walking to the Einstein bagels or 1069 01:32:41,980 --> 01:32:48,160 wherever, and very often their cars won't even move for several days. But when you compare it to 1070 01:32:48,160 --> 01:32:54,120 the grocery store that was there previously or traffic generation is probably minuscule, 1071 01:32:54,440 --> 01:32:59,880 I would guess Javier can speak to that with more data, but I don't know that it's necessary 1072 01:32:59,880 --> 01:33:05,080 unless we have any questions on it. So Chris, at this point in time, I'll hand it back to you. 1073 01:33:05,080 --> 01:33:11,500 So I would love an opportunity to talk briefly when you get to the second floor about the fitness and what we're doing there. 1074 01:33:11,920 --> 01:33:24,100 Okay. Yeah, there's not much to talk about on the lower level, but this is obviously lower level. We would have the pet spot down there as well. 1075 01:33:24,200 --> 01:33:29,620 But this would be the other half of the parking spaces in the basement. 1076 01:33:29,620 --> 01:33:29,820 but 1077 01:33:33,060 --> 01:33:35,640 for, I'm sorry, these are not colored, 1078 01:33:36,680 --> 01:33:42,120 but the, just quickly on the unit rundown, 1079 01:33:42,780 --> 01:33:44,860 the 20 units on the second floor 1080 01:33:45,380 --> 01:33:48,540 and 22 units per floor above that 1081 01:33:48,920 --> 01:33:50,520 gets us to our 86 units. 1082 01:33:51,120 --> 01:33:53,040 Let me zoom in here, Drew, for you. 1083 01:33:53,920 --> 01:33:57,280 So on the east side of the building, as we mentioned, 1084 01:33:57,960 --> 01:33:59,780 club room and fitness, 1085 01:34:00,340 --> 01:34:02,220 and you can see the 10-foot balconies 1086 01:34:02,220 --> 01:34:04,720 that run along the north and the south sides. 1087 01:34:06,620 --> 01:34:12,940 So these are, again, we're trying to activate this prominent corner here by creating spaces 1088 01:34:12,940 --> 01:34:18,680 that people will use, the fitness, for example, you can imagine people running on a treadmill. 1089 01:34:19,880 --> 01:34:22,980 There is an access to the outdoors off of the fitness area. 1090 01:34:23,380 --> 01:34:25,380 The club room is going to be a pretty cool space. 1091 01:34:25,380 --> 01:34:31,420 You can have it a baby shower there or a small event that's hopefully some day again 1092 01:34:31,980 --> 01:34:39,560 We intend to incorporate a fire feature on the balcony outside and it's it's just an extension 1093 01:34:39,560 --> 01:34:41,260 I suppose of your living room 1094 01:34:41,860 --> 01:34:47,700 But it will be a very very nice amenity for the residents that live here another thing that I'll point out 1095 01:34:47,700 --> 01:34:49,740 Just while you've got this up 1096 01:34:49,740 --> 01:34:51,900 Chris with the various units 1097 01:34:51,900 --> 01:34:55,480 there are certain things that we insist on incorporating. 1098 01:34:56,240 --> 01:34:58,840 And so Chris really gets it at this point, 1099 01:34:58,880 --> 01:35:01,340 but we want access to the outdoors for every unit. 1100 01:35:01,420 --> 01:35:03,680 And even now in COVID more than ever. 1101 01:35:04,040 --> 01:35:07,520 So, you know, that's either a balcony or a terrace, 1102 01:35:08,320 --> 01:35:10,100 but you've got to have a way 1103 01:35:10,100 --> 01:35:12,980 to have access to the outdoors from your unit. 1104 01:35:13,660 --> 01:35:16,640 Another thing is, you know, we work very hard 1105 01:35:16,640 --> 01:35:19,680 to incorporate walking closets in each of the units. 1106 01:35:19,680 --> 01:35:25,660 they all have in-unit washer, dryer, they're very well-appointed with hard surface counters, 1107 01:35:26,320 --> 01:35:35,640 eyed loss cabinetry we often use, LED light fixtures, smart thermostats. We don't do this just 1108 01:35:35,640 --> 01:35:42,520 because we like to, I think it helps us attract people to the building, but it's also kind of 1109 01:35:42,520 --> 01:35:47,500 the right thing to do and you know we work pretty closely with ComEd's energy efficiency 1110 01:35:47,500 --> 01:35:51,760 program to make sure that we're making smart energy decisions and occupancy 1111 01:35:51,760 --> 01:35:56,320 sensors in the corridor, the garage lighting for example drops to four from 1112 01:35:56,320 --> 01:36:00,940 100 to 40 percent when it doesn't sense anybody in there for a while. So those 1113 01:36:00,940 --> 01:36:05,580 are energy efficient appliances and probably putting you all to sleep with 1114 01:36:05,580 --> 01:36:12,260 all of this but we really do try to dial this in and get it right and using 1115 01:36:12,260 --> 01:36:17,540 really, you know, design or lighting fixtures and things like that. So, Chris, do you think 1116 01:36:17,540 --> 01:36:23,700 I missed anything on the unit? The only thing I would say is, so Holiday has asked that we 1117 01:36:23,700 --> 01:36:30,500 incorporate small office areas in each of the units as well. So, even the one bedrooms would get 1118 01:36:31,260 --> 01:36:36,080 a private office, we just felt that was something that everybody needs now. And 1119 01:36:36,080 --> 01:36:40,100 we don't think that's going to change. It's a place to have your Zoom calls, 1120 01:36:40,100 --> 01:36:43,080 You know, yeah, zoom, zoom room. 1121 01:36:44,960 --> 01:36:45,600 So 1122 01:36:47,800 --> 01:36:49,000 I wouldn't get it. 1123 01:36:49,640 --> 01:36:55,340 They're thoughtfully arranged units and, you know, the style of living has 1124 01:36:55,340 --> 01:36:59,180 changed dramatically even from apartments built just 20 years ago where there was 1125 01:36:59,180 --> 01:37:03,240 dedicated dining room space that's really moved away from that. 1126 01:37:03,240 --> 01:37:11,580 And so, I guess that's all I have to say, Chris, at least for now on the inside of the unit, so try to pick up. 1127 01:37:12,040 --> 01:37:21,940 All right, so, so just real quick on the colored landscape plan just give you a little better idea of the green space around the building. 1128 01:37:22,900 --> 01:37:31,920 There is about a 17 foot drop from the southeast corner to the northwest corner. So that came up before but. 1129 01:37:31,920 --> 01:37:39,020 So there is a significant hill that we've chosen to put the green scape around 1130 01:37:39,020 --> 01:37:42,360 along the back and along the west side of the building. 1131 01:37:44,020 --> 01:37:49,720 As we mentioned, there's a drop where this whole back alley really is a sunken area. 1132 01:37:50,140 --> 01:37:54,340 So it's shielded visually from the people to the north. 1133 01:37:55,260 --> 01:37:59,340 And then the addition of trees around the whole site. 1134 01:38:00,300 --> 01:38:08,960 And we're going to save the light poles that are there and reinstall all the light poles. Add some benches and various other things. 1135 01:38:10,120 --> 01:38:23,320 So let me get to the architecture. So from the last time we've gotten a lot of feedback on paying attention to what do you feel when you're walking up and down the street. 1136 01:38:23,320 --> 01:38:29,260 And we've redesigned the entire south portion. 1137 01:38:30,040 --> 01:38:35,000 We feel pushing the building back that 10 feet really opened up the space. 1138 01:38:35,600 --> 01:38:40,780 We've got a few 3D images from a consultant that we'll get to as well. 1139 01:38:40,820 --> 01:38:41,880 And you can feel it a little better. 1140 01:38:42,260 --> 01:38:47,360 But along with having this as public space, really, 1141 01:38:47,500 --> 01:38:51,440 or private balconies for everybody along the south end 1142 01:38:51,440 --> 01:38:58,560 and the public space at the corner. We've redetailed and we heard a lot of comments 1143 01:38:58,560 --> 01:39:03,420 about adding detail, so I can, we'll show you a few other pictures here of ideas we 1144 01:39:03,420 --> 01:39:04,620 have along the street. 1145 01:39:06,680 --> 01:39:11,160 Pushing garage doors back, changing materials, adding sconces. 1146 01:39:12,000 --> 01:39:16,900 So we really tried to pay attention to how does this feel as you walk up and down 1147 01:39:16,900 --> 01:39:23,880 the street. Again, we widen the sidewalk along this side as well. So each side will 1148 01:39:23,880 --> 01:39:29,860 have about an 11 foot wide sidewalk, which is significantly more than what is there and 1149 01:39:29,860 --> 01:39:35,740 even what the village owns. They'll have a little bit more sidewalk either way. We've 1150 01:39:35,740 --> 01:39:44,880 added what we call jewelry to the building. Clock, flags. We've changed up the awnings. 1151 01:39:45,600 --> 01:39:47,680 We'll go through a few other areas. 1152 01:39:47,920 --> 01:39:50,420 I have to tell my quick clock story. 1153 01:39:50,640 --> 01:39:53,800 I understand there's some history of challenged clocks 1154 01:39:53,800 --> 01:39:58,000 in Glen Ellen, and I don't call them jewelry. 1155 01:39:58,340 --> 01:39:59,900 Chris, I call them accoutrements, 1156 01:40:00,420 --> 01:40:02,660 but we put on our building in Downers Grove, 1157 01:40:02,900 --> 01:40:04,560 a clock called Big Sam. 1158 01:40:04,920 --> 01:40:07,400 We found it on a building that was torn down 1159 01:40:07,720 --> 01:40:09,760 near the monument to the Great Fire of London. 1160 01:40:10,180 --> 01:40:12,740 We shipped it here, put it up on the building, 1161 01:40:12,740 --> 01:40:18,380 and there's a plaque on it and it's really just a fun story and it's an 1162 01:40:18,380 --> 01:40:23,840 example of us not just cutting corners but really going the extra mile. Here's 1163 01:40:23,840 --> 01:40:27,760 my embarrassing story. So we go and meet with Karen Hall at the Glen Ellen 1164 01:40:27,760 --> 01:40:33,260 Historical Society. We find this beautiful corner bracket hung clock and we 1165 01:40:33,260 --> 01:40:38,600 worked with Larry Olive who deals with the Marshall Fields clock etc. and 1166 01:40:38,600 --> 01:40:40,280 and asked him if he could replicate it. 1167 01:40:40,780 --> 01:40:43,580 And we thought that this clock no longer exists, 1168 01:40:43,620 --> 01:40:47,760 but it's still on the corner of Main Street and Crescent. 1169 01:40:47,940 --> 01:40:49,500 So we waste a little time trying to, 1170 01:40:49,520 --> 01:40:51,300 we now can't copy their clock, 1171 01:40:52,000 --> 01:40:54,280 but we're, there's a picture later 1172 01:40:54,280 --> 01:40:59,140 of what we're trying to do on that particular feature. 1173 01:40:59,520 --> 01:41:02,620 And then Chris, there's, there are some other elements, 1174 01:41:03,480 --> 01:41:05,380 you know, that we can probably get to. 1175 01:41:05,460 --> 01:41:07,500 I know Katie mentioned the gas lanterns, 1176 01:41:07,500 --> 01:41:09,080 but it really is a nice touch. 1177 01:41:09,660 --> 01:41:12,440 And we're doing that at the front entrance. 1178 01:41:12,880 --> 01:41:18,160 Some of the feedback that we got from the historical society 1179 01:41:19,040 --> 01:41:21,960 as well as the historical preservation committee 1180 01:41:21,960 --> 01:41:25,500 was just incorporating this vertical filigree ironwork. 1181 01:41:25,700 --> 01:41:27,000 And so we're trying to do that. 1182 01:41:27,060 --> 01:41:28,500 We thought it was a really great idea. 1183 01:41:29,160 --> 01:41:31,480 And then another concept came out of it, 1184 01:41:31,500 --> 01:41:32,340 which was a mural. 1185 01:41:32,900 --> 01:41:34,840 And so we've done that previously. 1186 01:41:35,200 --> 01:41:36,340 I think there's a picture later 1187 01:41:36,340 --> 01:41:41,320 and Chris's presentation. But these are some of the things that we're trying to do to pay homage 1188 01:41:41,320 --> 01:41:46,540 to the history of the site and the history of this community and make sure that it tastefully fits 1189 01:41:46,540 --> 01:41:57,240 in with within the fabric of Glen Ellen. Right. So just different views of, you know, 1190 01:41:58,120 --> 01:42:02,240 how it will look from different angles. I know Katie went through a few of these as well. 1191 01:42:02,240 --> 01:42:06,420 we wanted to look at the building at night because we feel it's you know it's 1192 01:42:06,420 --> 01:42:10,160 not just there during the day we want to understand at night played with 1193 01:42:10,160 --> 01:42:17,380 different lighting patterns and you know where how it would look what kind of 1194 01:42:17,380 --> 01:42:21,960 sconces go with this type of building what go with the community we've 1195 01:42:21,960 --> 01:42:28,060 studied different areas of the community and ultimately we feel like 1196 01:42:28,060 --> 01:42:33,400 we've got the lighting right and and the building as well 1197 01:42:36,720 --> 01:42:40,320 so I'm gonna go to these 1198 01:42:40,320 --> 01:42:45,220 so what we did along the street as Drew was saying we added a lot of iron work 1199 01:42:45,220 --> 01:42:52,520 along the whole building but especially along Crescent just above the one 1200 01:42:52,520 --> 01:42:58,520 story space so as you're walking down the street it's gonna feel like 1201 01:42:58,520 --> 01:43:04,300 different facades as you're walking by. These these different portions bump out. 1202 01:43:04,480 --> 01:43:09,380 There's varying heights so you'll not just feel like you're walking along one 1203 01:43:09,380 --> 01:43:18,260 story wall. You know there's different arches and things like that and we do 1204 01:43:18,260 --> 01:43:22,920 have some ideas for what we can do here to enliven it a little bit more. We 1205 01:43:22,920 --> 01:43:27,520 think we're gonna have to engage the historical society and do some 1206 01:43:27,520 --> 01:43:32,320 research ourselves to get this next step, but it's something I don't know that 1207 01:43:32,320 --> 01:43:39,980 we've proposed to Katie yet, but we'll have to talk about that. But we've talked 1208 01:43:39,980 --> 01:43:46,400 about the different materials on the site. We've submitted a sample board if 1209 01:43:46,400 --> 01:43:51,220 anyone wants to see the actual colors, but we're trying to really do a 1210 01:43:51,220 --> 01:44:00,340 variation. We've chosen three very different bricks, real stone, black windows, black accents. 1211 01:44:00,600 --> 01:44:04,680 We played with different colors on this building. We feel we've got the colors right. 1212 01:44:10,350 --> 01:44:12,290 So I'll 1213 01:44:12,290 --> 01:44:17,290 let Drew talk a little bit about some of the, this is just some imagery of what they've 1214 01:44:17,290 --> 01:44:21,810 done at other buildings. Just to show you, you know, this is not just someone walking 1215 01:44:21,810 --> 01:44:27,050 in off the street. This is a company that does this a lot. So Drew, I don't know if you want to 1216 01:44:27,050 --> 01:44:35,890 start. Yeah, actually there's a big Sam clock in the upper left corner, Chris, of your screen. 1217 01:44:36,490 --> 01:44:42,050 This is actually, all these pictures are pulled from Burlington Station. We elected to do that 1218 01:44:42,050 --> 01:44:49,670 because it's, you know, in many ways comparable in terms of the size of the site as well as 1219 01:44:49,670 --> 01:44:55,830 the unit quantity. So, you know, we've got a variety of different amenity spaces. There's 1220 01:44:55,830 --> 01:44:59,010 a fitness area, the outdoor TV. 1221 01:45:00,000 --> 01:45:07,340 Local TV wall here, a grilling station, you know, all of these buildings that we embrace 1222 01:45:07,340 --> 01:45:13,340 pets in our communities. Katie mentioned the pets by you can give your dog a bath or a blow 1223 01:45:13,340 --> 01:45:20,140 in a hair drive or a cut. Chris, why don't you zoom in on the aura award for a minute. 1224 01:45:20,600 --> 01:45:27,400 I'm going to brag briefly. This project in Downers Grove that was an inspiration for 1225 01:45:27,400 --> 01:45:32,400 what we're proposing here in Glen Allen was rigged to the top five apartment 1226 01:45:32,400 --> 01:45:37,260 buildings in the state of Illinois. This is based on unsolicited online user 1227 01:45:37,260 --> 01:45:44,540 reviews. We really value our residents greatly. And we want this to feel like 1228 01:45:44,540 --> 01:45:50,020 their home. This isn't just something that we say we believe it. We live it. 1229 01:45:50,280 --> 01:45:55,960 We participate in local food drives. We just ran a blood drive at the 1230 01:45:55,960 --> 01:46:02,760 Downers Grove building and you know that people end up staying in our buildings 1231 01:46:02,760 --> 01:46:08,220 much longer than the average because they love to live there and it's part of 1232 01:46:08,220 --> 01:46:13,900 what makes us successful so thanks Chris I this should be similar you know that 1233 01:46:13,900 --> 01:46:21,640 inside of the unit to what it might feel like but that's all I got okay all 1234 01:46:21,640 --> 01:46:28,240 So we wanted to talk about how we got to where we are and some of the things 1235 01:46:28,240 --> 01:46:32,260 maybe we should have these slides a little sooner but we were mimicking can 1236 01:46:32,260 --> 01:46:39,080 you zoom in on that yeah we went down a path to recreate that and it still 1237 01:46:39,080 --> 01:46:46,340 exists I'm so embarrassed so so we just want to show you know we've been 1238 01:46:46,340 --> 01:46:50,320 looking at you know different buildings as you know from the day we walked in 1239 01:46:50,320 --> 01:46:56,360 the door we're encouraged to, you know, really look at the downtown. And these are just some 1240 01:46:56,360 --> 01:47:03,960 of the buildings and some of the areas. As Drew mentioned, at 460 Main, this historic 1241 01:47:03,960 --> 01:47:13,120 clock feature, the black awnings, the brick colors, the gas lanterns, the corner treatment. 1242 01:47:14,780 --> 01:47:18,240 This one, actually this was kind of our first corner treatment where we actually had 1243 01:47:18,240 --> 01:47:24,340 a column on the corner, and we've changed it to, which is actually at Duane and Maine 1244 01:47:24,340 --> 01:47:32,300 and Clipped Corner, the Blackberry Market, the detailing in the walls with the stone 1245 01:47:32,300 --> 01:47:40,760 and the brick, the downlights above, there's these Gooseneck, which are another feature 1246 01:47:40,760 --> 01:47:46,880 that you see throughout the downtown that we've incorporated as well. Columns, you 1247 01:47:46,880 --> 01:47:51,500 you know, framing in the storefronts, the banding going across the building, 1248 01:47:53,700 --> 01:48:00,860 Pennsylvania Avenue, these buildings over here, the masonry, the banding, the detailing, again, 1249 01:48:01,060 --> 01:48:07,100 gas lanterns, the window grids. This was, I think, one of the first spots we saw, the black windows 1250 01:48:07,100 --> 01:48:13,480 with the window grids. Again, Duane and Maine, you know, the clipped corner, black awnings, 1251 01:48:13,480 --> 01:48:19,720 the columns, the goose neck lights. You're starting to see, you know, we did use the elements. 1252 01:48:20,500 --> 01:48:25,740 We may have, you know, arranged them a little bit differently, but I think we've been sympathetic 1253 01:48:25,740 --> 01:48:34,100 to the local architecture in our design. And I don't think we're, and then the other relevant 1254 01:48:34,680 --> 01:48:43,460 ones are the Glen Aster condos and the new Civic Center parking with the stone and the 1255 01:48:43,460 --> 01:48:46,180 Very good. Let's keep going. 1256 01:48:46,760 --> 01:48:54,220 Yeah. So what we were, you know, after talking with the historical society, they had shared some images with us. 1257 01:48:55,400 --> 01:49:05,420 Some cornice samples that they had given us, decorative, you know, again, gas feature, gas lights, enhanced columns. 1258 01:49:05,820 --> 01:49:08,360 These are a few things we're actually pursuing. 1259 01:49:12,100 --> 01:49:17,780 Maybe taking a closer look at putting some carvings into the columns at the front door. 1260 01:49:19,360 --> 01:49:25,360 We're trying to see if we can maybe get a gas lanterns that are a little bit more historic 1261 01:49:25,360 --> 01:49:26,280 than what we have. 1262 01:49:28,500 --> 01:49:33,820 And as you, you know, you had seen the archers down the street on Crescent, what we're looking 1263 01:49:33,820 --> 01:49:41,060 at doing there is maybe working with them or local artisans to create maybe some iron 1264 01:49:41,060 --> 01:49:41,360 work. 1265 01:49:42,340 --> 01:49:48,040 We've added the goosenecks above the arches and the different niches along Crescent and 1266 01:49:48,040 --> 01:49:51,020 we think it's going to be a great spot to maybe put some local art. 1267 01:49:52,300 --> 01:49:54,360 Maybe it's an old window from a church. 1268 01:49:54,700 --> 01:49:59,660 Maybe it's an old gate off an old house that has a lot of interest. 1269 01:49:59,660 --> 01:50:05,960 maybe this is rotating art that can be changed around, but it would give a lot 1270 01:50:05,960 --> 01:50:09,520 of interest to people walking up and down the street instead of just a brick 1271 01:50:09,520 --> 01:50:16,520 wall. So this is another clock that Druid mentioned. We're looking at maybe 1272 01:50:16,520 --> 01:50:21,460 designing our own clock, having some sort of a feature that's unique to the 1273 01:50:21,460 --> 01:50:21,780 building. 1274 01:50:24,820 --> 01:50:27,480 Murals is something else that we've looked at. There are 1275 01:50:27,480 --> 01:50:33,160 examples of murals in the town. We thought that was another interesting thing 1276 01:50:33,160 --> 01:50:40,280 that the Historical Society had brought up. We entertained looking at areas that, 1277 01:50:40,440 --> 01:50:47,880 you know, that would work on the site. More than happy to do that. And I'll show 1278 01:50:47,880 --> 01:50:53,780 you a quick example of something that Holliday has actually done in their own 1279 01:50:53,780 --> 01:50:54,140 buildings. 1280 01:50:57,440 --> 01:51:02,820 Vivian Meyer, she's a nanny slash photographer who sort of became 1281 01:51:02,820 --> 01:51:07,540 famous posthumously, went around taking these spontaneous pictures with the 1282 01:51:07,540 --> 01:51:12,140 rolloflex camera. All the pictures are square. She's called the originator of 1283 01:51:12,140 --> 01:51:16,960 the selfie. So we were able to acquire a number of original prints that 1284 01:51:17,840 --> 01:51:22,260 pictures that she took. We adorned the building with it and painted a mural 1285 01:51:22,260 --> 01:51:29,840 telling this story and it would just be another example of the type of 1286 01:51:29,840 --> 01:51:33,820 attention that we put under the inside of the building. Some of the ideas that we 1287 01:51:33,820 --> 01:51:38,160 have right now for our lobby if you go to the upper left corner Chris of this 1288 01:51:38,160 --> 01:51:44,040 is just you know trying to take advantage of existing terrific 1289 01:51:44,040 --> 01:51:48,220 photography of the downtown and pulling that into the lobby and 1290 01:51:48,220 --> 01:51:54,060 celebrating the McChesney and Miller grocery who we've been in touch with their 1291 01:51:54,060 --> 01:52:00,600 family by the way and you know again I hate to keep repeating the phrase 1292 01:52:00,600 --> 01:52:06,380 pain homage but it's important and we realize the deep history of this town 1293 01:52:06,380 --> 01:52:12,320 and this site and we really are trying to identify ways to celebrate that so 1294 01:52:12,320 --> 01:52:13,760 So this is one of the examples. 1295 01:52:15,300 --> 01:52:15,800 Yeah. 1296 01:52:19,100 --> 01:52:23,220 And then just other imagery that has been shared with us, 1297 01:52:23,360 --> 01:52:26,620 there was a lot of floral imagery that 1298 01:52:27,500 --> 01:52:32,820 has come up, the harm and wild flowers and other things, 1299 01:52:33,180 --> 01:52:36,460 birds, that again, these are all images and ideas 1300 01:52:36,460 --> 01:52:39,300 that we've got after meeting with the Historical Society. 1301 01:52:39,980 --> 01:52:43,960 We're not 100% sure where exactly things could go, 1302 01:52:43,960 --> 01:52:50,260 but it definitely generated a lot of ideas that we think are great and we think is really enhanced the building 1303 01:52:54,640 --> 01:53:02,540 Go ahead Chris. I think just out of respect for everybody. We're probably going a little it's probably my fault, but 1304 01:53:03,100 --> 01:53:09,240 Try going in a little too much detail here. Yeah, so I will finish with these are some 1305 01:53:09,900 --> 01:53:16,540 Images that we have gotten we just received and this is actually a we submitted our model 1306 01:53:16,900 --> 01:53:24,280 of the building to your consultant who is modeling your downtown. So, you know, we haven't had too 1307 01:53:24,280 --> 01:53:31,020 much time to really tweak these or sort through them or check their accuracy, but they seem pretty 1308 01:53:31,020 --> 01:53:36,760 good as far as, you know, they have actually modeled all the buildings or they're in the 1309 01:53:36,760 --> 01:53:43,020 process of that. So what this does is gives you an understanding of how the building will fit 1310 01:53:44,160 --> 01:53:53,160 into the town. To the south of the building, I know we're going for the 1311 01:53:53,160 --> 01:53:56,520 zero-lot line but there is nothing across the street and it's our 1312 01:53:56,520 --> 01:54:00,200 understanding there probably will never be anything across the street to be 1313 01:54:00,200 --> 01:54:05,300 crowded or whatnot. I don't think that the building being up against the lot 1314 01:54:05,300 --> 01:54:10,900 line is a negative since the downtown is a block away and everything there is 1315 01:54:10,900 --> 01:54:17,140 on the zero lot line. But you get the feeling for, you know, what this would feel like on 1316 01:54:17,140 --> 01:54:17,560 the street. 1317 01:54:22,040 --> 01:54:29,280 This is looking from the west. I'm sorry, from the east. And this is up looking 1318 01:54:29,280 --> 01:54:30,980 north on Pennsylvania Avenue. 1319 01:54:33,430 --> 01:54:37,250 And this is looking south from the rooftops of Pennsylvania 1320 01:54:37,250 --> 01:54:44,990 Avenue. And sorry, I know you're forgot your little bit small there. And then this 1321 01:54:44,990 --> 01:54:51,830 This is actually in the northwest looking southeast off of Pennsylvania Avenue. 1322 01:54:55,590 --> 01:54:59,310 There is one last height thing I do need to point out. 1323 01:55:00,230 --> 01:55:07,570 So we're going for a height variance and I think, you know, we've talked about the 1324 01:55:07,570 --> 01:55:12,070 60-foot height and this just I think makes it a little more clear. 1325 01:55:12,310 --> 01:55:14,330 This dashed line is your 60 feet. 1326 01:55:14,330 --> 01:55:20,610 as you can see that's actually above our roof in pretty much any other town 1327 01:55:20,610 --> 01:55:27,710 around the Chicagoland area and I would I would beg to say the U.S. they don't take 1328 01:55:27,710 --> 01:55:31,870 they take it to the roof line is the maximum building height Glen Ellen is 1329 01:55:31,870 --> 01:55:36,690 is an odd town where they actually take it to the top of whatever is on the 1330 01:55:36,690 --> 01:55:43,670 roof so anywhere else that I know of around Chicagoland this building is 1331 01:55:43,670 --> 01:55:50,590 below the maximum building height. Parapets do not count, elevators, shafts, mechanical 1332 01:55:50,590 --> 01:55:57,790 units do not count. So just wanted to point that out that actually, you know, the elements 1333 01:55:57,790 --> 01:56:01,650 that we've been encouraged to push up are actually the things that are pushing us over 1334 01:56:01,650 --> 01:56:09,030 the building height here. And the other slide I would show is our relationship. We are 1335 01:56:09,030 --> 01:56:14,530 at a valley, we're at a very low point in the village. You can see this is a 1336 01:56:14,530 --> 01:56:20,610 north-south cut through the site. These are actually the townhomes north of 1337 01:56:20,610 --> 01:56:26,850 Pennsylvania, and we are about the same height as they are. They're one story 1338 01:56:26,850 --> 01:56:31,990 shorter, but since we are so low, we are really just about the same height as 1339 01:56:31,990 --> 01:56:36,930 they are. So again, just to go, I know height has come up in a few 1340 01:56:36,930 --> 01:56:44,490 comments from, you know, people emailing in and other people have made comments, but I 1341 01:56:44,490 --> 01:56:49,930 just wanted to point that out that we are, you know, we don't feel height is an issue 1342 01:56:51,850 --> 01:56:52,870 for those reasons. 1343 01:56:55,140 --> 01:56:56,480 And I will stop there. 1344 01:57:00,360 --> 01:57:00,860 All right. 1345 01:57:00,980 --> 01:57:01,480 Thank you, Chris. 1346 01:57:02,320 --> 01:57:02,560 Thank you. 1347 01:57:05,720 --> 01:57:08,540 Drew, is that the last of the presentation? 1348 01:57:09,600 --> 01:57:12,580 I bet you guys hope so. I think it is. 1349 01:57:14,240 --> 01:57:19,240 We'd love to have comments, questions from the plan commission, from the community. 1350 01:57:21,300 --> 01:57:23,340 I believe we're done. Thank you. 1351 01:57:23,340 --> 01:57:26,940 Okay. Well, thank you all three of you very much. I really appreciate it. 1352 01:57:27,560 --> 01:57:37,620 I, and this is the opportunity for the plan commission to ask questions of you three. So let's start with the, is there any questions from the plan commissioner from our petitioners. 1353 01:57:40,020 --> 01:57:40,900 I have some. 1354 01:57:41,400 --> 01:57:42,960 Okay, John, let's start with you. 1355 01:57:43,660 --> 01:57:48,760 Can we stop with the screen sharing so I can see our fellow plant commissioners? 1356 01:57:49,380 --> 01:57:53,100 Unless there's something you wanted to see and you're asking about, John. 1357 01:57:53,320 --> 01:57:55,040 So let's see. 1358 01:57:55,040 --> 01:57:58,360 Well, I just, a couple of things. 1359 01:57:58,560 --> 01:58:04,520 One, could you address safety in terms of evacuating the building? 1360 01:58:07,300 --> 01:58:13,740 and also the other thing that crossed my mind, I know we're replacing an impervious service 1361 01:58:13,740 --> 01:58:23,560 from an impervious surface, but are there particular stormwater control elements that 1362 01:58:23,560 --> 01:58:24,960 are incorporated into the building? 1363 01:58:25,800 --> 01:58:39,320 So I have that and then I'm interested in the in the in the single in the the single of the metering of separate metering of apartments in terms of utilities. 1364 01:58:40,740 --> 01:58:46,540 Okay, Chris why don't you tackle ingress egress fire in situations for water. 1365 01:58:46,980 --> 01:58:47,600 Okay. 1366 01:58:48,780 --> 01:58:49,460 Sorry. 1367 01:58:50,440 --> 01:58:52,340 I will just jump back to the screen here. 1368 01:58:52,340 --> 01:59:02,920 So, egress, obviously, we would be following all of the, you know, IBC codes and local fire ordinance codes. 1369 01:59:04,560 --> 01:59:13,160 There are, that's probably the best one, two stairwells, you know, the travel distances have been checked. 1370 01:59:13,300 --> 01:59:20,040 We're within the guidelines of travel distances, so there would be a stair at the back of the building as well as the front of the building. 1371 01:59:20,780 --> 01:59:27,160 both would exit directly out to protected pathways to get out. 1372 01:59:27,500 --> 01:59:32,320 So it's a typical anything you'd see in an apartment building 1373 01:59:32,320 --> 01:59:37,660 or a hotel or whatever, same type of evacuation. 1374 01:59:37,980 --> 01:59:39,240 Fully sprinkled building. 1375 01:59:39,380 --> 01:59:40,860 Fully sprinkled building, yes. 1376 01:59:43,160 --> 01:59:48,720 stormwater, that, you know, we do have green space. 1377 01:59:49,760 --> 01:59:51,100 Chris, I can answer that. 1378 01:59:52,160 --> 01:59:52,320 Okay. 1379 01:59:52,560 --> 01:59:57,540 If you're a civil engineer, any McKenna is also available to answer questions. 1380 01:59:57,540 --> 01:59:59,760 Um, but they 1381 02:00:00,210 --> 02:00:08,070 I guess Commissioner Mulheron, they are under the threshold to provide additional stormwater 1382 02:00:08,070 --> 02:00:15,930 facilities on the site with less than 300 square feet of net new impervious surface. And then 1383 02:00:15,930 --> 02:00:22,130 they do have some drainage, stormwater drainage facilities along the north side of the building 1384 02:00:22,130 --> 02:00:29,790 and then it connects into the sewer and the rights of way if we need to swear in 1385 02:00:29,790 --> 02:00:33,930 senior civil engineer McKenna to speak in greater detail unless that answers your 1386 02:00:33,930 --> 02:00:34,290 question. 1387 02:00:37,520 --> 02:00:42,760 Is that okay? Yeah I think it's fine that's fine. Okay. I'll address 1388 02:00:42,760 --> 02:00:47,680 metering so all the buildings will be independently metered for 1389 02:00:47,680 --> 02:00:53,140 electricity. NICOR will not independently meter buildings for gas 1390 02:00:53,140 --> 02:00:59,140 any longer. The way that we address that is through a sub-metering system by Yardee or 1391 02:00:59,140 --> 02:01:07,960 real page or two of the vendors that we typically work with. So I guess that I could talk more 1392 02:01:07,960 --> 02:01:10,980 about it but I guess that probably answers your question. 1393 02:01:12,140 --> 02:01:12,640 Drew. 1394 02:01:13,220 --> 02:01:13,940 Water trash. 1395 02:01:16,320 --> 02:01:17,620 Drew, can you hear me now? 1396 02:01:18,100 --> 02:01:21,280 Mike, we can hear you but we're going to have to swear you in before you speak. 1397 02:01:22,120 --> 02:01:31,320 Hi, Mike O'Connor. I'm with Holiday Properties Vice President Leasing and Development, 6370 1398 02:01:31,320 --> 02:01:39,940 AmeriPlex Drive, Portage, Indiana. Okay, Barbara would you slow them in please? All right. Do 1399 02:01:39,940 --> 02:01:45,160 you swear to tell the truth, the whole truth and nothing but the truth? Yes, I do. Thank you. 1400 02:01:45,160 --> 02:01:46,460 Thank you. 1401 02:01:46,480 --> 02:01:47,280 Welcome, Mike. 1402 02:01:48,720 --> 02:01:48,800 Thanks. 1403 02:01:49,160 --> 02:01:49,920 Sorry for the confusion. 1404 02:01:50,380 --> 02:01:52,920 I just wanted to add on the exiting that we, 1405 02:01:53,000 --> 02:01:54,700 we have an emergency generator. 1406 02:01:54,960 --> 02:01:57,820 It would be connected to the elevators for, 1407 02:01:57,900 --> 02:02:00,040 for residents either. 1408 02:02:02,220 --> 02:02:05,020 Limited in mobility or otherwise. 1409 02:02:05,700 --> 02:02:08,280 To exit the building and emergency as well. 1410 02:02:08,600 --> 02:02:10,060 Emergency generator kicks in. 1411 02:02:11,880 --> 02:02:12,680 Using the elevator. 1412 02:02:12,680 --> 02:02:15,700 And there's areas of rescue in the building as well. 1413 02:02:17,990 --> 02:02:19,070 Okay, thank you. 1414 02:02:20,010 --> 02:02:22,270 And John, that answers your question, correct? 1415 02:02:22,770 --> 02:02:22,930 Yep. 1416 02:02:23,410 --> 02:02:23,650 Okay. 1417 02:02:25,390 --> 02:02:28,070 Others have questions for the petitioner. 1418 02:02:29,930 --> 02:02:30,790 Okay, go ahead, Tracy. 1419 02:02:32,530 --> 02:02:41,950 Can you give us a little bit of idea of what you would think about what type of retail space, you know, what, what type of. 1420 02:02:43,250 --> 02:02:43,810 Yeah. 1421 02:02:43,810 --> 02:02:46,030 What could be in that retail space? 1422 02:02:46,270 --> 02:02:48,130 I meant to speak to that earlier. 1423 02:02:48,750 --> 02:02:50,510 Thank you for that question. 1424 02:02:50,610 --> 02:02:53,350 So we haven't started marketing this space yet, 1425 02:02:53,350 --> 02:02:56,070 but what we envision here would be 1426 02:02:56,070 --> 02:02:58,210 some sort of a service retail, 1427 02:02:58,650 --> 02:03:00,910 a boutique retailer, for example. 1428 02:03:01,810 --> 02:03:04,070 What we're chasing right now 1429 02:03:04,070 --> 02:03:06,550 is we have this exclusive opportunity 1430 02:03:06,550 --> 02:03:08,030 as sort of a high-end deli 1431 02:03:08,030 --> 02:03:09,770 with fresh cut meats and sandwiches. 1432 02:03:10,150 --> 02:03:12,810 There's one in a community, not far, 1433 02:03:12,810 --> 02:03:17,510 that we're working with the owner to try to get him in. 1434 02:03:18,010 --> 02:03:21,550 That's actually, we asked McChesney Miller family 1435 02:03:21,550 --> 02:03:23,930 if we could use their name for the deli. 1436 02:03:24,750 --> 02:03:27,390 They have to, apparently it's a democratic process 1437 02:03:27,390 --> 02:03:29,690 in the family if they were to authorize that. 1438 02:03:29,830 --> 02:03:32,830 But those are some of the ideas, a hair salon, 1439 02:03:33,110 --> 02:03:34,550 potentially a nail salon. 1440 02:03:35,770 --> 02:03:38,650 I would say a boutique, a wine shop, 1441 02:03:38,890 --> 02:03:40,870 like you've got in, say, downtown Hinsdale, 1442 02:03:40,870 --> 02:03:44,510 but we kind of have that across the street, but it would be of that vein. 1443 02:03:47,140 --> 02:03:50,220 Thank you. That's a nice idea. 1444 02:03:52,700 --> 02:03:53,720 Other, go ahead, David. 1445 02:03:55,340 --> 02:04:03,200 Thank you. I had just a few questions. The last building section that you showed sort of indicated 1446 02:04:04,280 --> 02:04:09,740 that mechanical equipment equipment was actually the highest part of the project. 1447 02:04:09,740 --> 02:04:14,880 can you bring that yeah it was the black and white section that you showed at the 1448 02:04:14,880 --> 02:04:21,160 end there yeah it or maybe Chris you brought it yeah I'm building heights so 1449 02:04:21,160 --> 02:04:29,600 you are right it is the the it's the mechanical unit that is actually the 1450 02:04:29,600 --> 02:04:35,060 highest the elevator shaft is you know our typical shaft is only about four 1451 02:04:35,060 --> 02:04:41,380 and a half feet so you are correct. So is that like a cooling tower? No it would 1452 02:04:41,380 --> 02:04:46,660 be those are typically the fresh air units for the hallways that bring in 1453 02:04:46,660 --> 02:04:50,760 okay make up there yeah the make up there. All right so if those are the 1454 02:04:50,760 --> 02:04:55,000 tallest elements and we can't build a screen higher than those tallest 1455 02:04:55,000 --> 02:04:58,340 elements are you gonna build a screen to surround those elements? 1456 02:05:00,880 --> 02:05:01,980 Yeah that's 1457 02:05:01,980 --> 02:05:03,800 That's something that we've talked to staff about. 1458 02:05:05,020 --> 02:05:08,060 What the plan was really was to understand 1459 02:05:09,000 --> 02:05:13,020 the 3D views from the consultants 1460 02:05:13,020 --> 02:05:15,400 to see if they were visible from the street. 1461 02:05:15,880 --> 02:05:17,760 And if they determined they were visible, 1462 02:05:17,760 --> 02:05:20,600 then we would just provide screens 1463 02:05:20,600 --> 02:05:22,180 around those separate screens. 1464 02:05:23,040 --> 02:05:23,080 Yeah. 1465 02:05:23,620 --> 02:05:26,100 I mean, I guess I'm also, you know, 1466 02:05:26,160 --> 02:05:28,520 I understand streets, but I also know you, 1467 02:05:28,520 --> 02:05:44,180 The neighbors, you know, the neighbors to the north are going to be seeing those units. They have pretty much a blocked view and I would think a little sensitivity now a mechanical unit versus a screen. 1468 02:05:44,780 --> 02:05:54,040 You know, the mechanical units smaller than a surrounding screen that you'd have to build around it. So I understand, as long as noise doesn't become an issue. 1469 02:05:56,600 --> 02:06:07,420 Yeah, the parapets we felt were pretty tall, but we said we would, you know, hold and let 1470 02:06:07,420 --> 02:06:12,880 the 3D model speak for itself. And if they have to be screened separately, then that's 1471 02:06:12,880 --> 02:06:14,580 something that would have to be done. 1472 02:06:15,160 --> 02:06:18,520 Okay. Just two other questions, they'll be short. 1473 02:06:18,520 --> 02:06:19,000 Sure. 1474 02:06:19,240 --> 02:06:25,320 On the street along Crescent, you know, the safety and pulling the garage doors in, I 1475 02:06:25,320 --> 02:06:27,240 do think help a little bit in that. 1476 02:06:27,400 --> 02:06:36,600 Can you describe when a car comes in and out, are there safety lights, something to warn 1477 02:06:36,600 --> 02:06:37,420 the pedestrians? 1478 02:06:38,000 --> 02:06:44,600 Yeah, we're going to have to do safety lights that would be flashing, I believe, a beep 1479 02:06:44,600 --> 02:06:45,500 as well. 1480 02:06:45,500 --> 02:06:49,700 I'm not not a hundred percent sure on that what the rules are right now, but 1481 02:06:50,780 --> 02:06:56,900 And then it is set back the system that we've proposed is a 1482 02:06:57,780 --> 02:07:03,140 Window sticker on the cars. So when they pull up the garage door immediately starts to open and 1483 02:07:04,380 --> 02:07:10,240 The garage doors are pretty slow, you know, so you do even if you're a passerby you kind of see, you know 1484 02:07:10,240 --> 02:07:12,320 they're not that you know like 1485 02:07:12,320 --> 02:07:21,420 Quick roll-up doors like you'd see in a factory or something. Okay. Okay. And then as far as the parking goes the 1486 02:07:21,420 --> 02:07:31,160 1.2 spaces, are they assigned? Are they leased? Or are they first come first serve park anywhere? Yeah, true. 1487 02:07:31,160 --> 02:07:39,180 So all of our parking is assigned and it can rotate a little bit, but you know where your spot is. 1488 02:07:39,260 --> 02:07:46,580 It's one of the ways that, you know, you just kind of get really used to pulling into your spot every day. 1489 02:07:47,300 --> 02:07:52,860 But they're all assigned parking. Another thing that we try to do to discourage, you know, 1490 02:07:52,960 --> 02:07:59,520 the second parking space is we charge a little bit more for that and try to utilize economics to encourage walkability. 1491 02:07:59,520 --> 02:08:10,680 But yeah, I think with garages like this assigned spaces, I mean, like you said, there's some are some of these spaces are tough people get used to backing into them or whatever. 1492 02:08:11,240 --> 02:08:11,840 Yeah. 1493 02:08:12,240 --> 02:08:25,480 But then the other issue, you know, guest parking is that something that you've accounted for is that something the village is going to account address or permit street or lot parking for guests. 1494 02:08:26,960 --> 02:08:32,340 So, I am not able to answer for the village, I will defer to them. 1495 02:08:33,180 --> 02:08:44,860 We so closely manage these buildings that if we have an extra one or two or three spots and somebody has a grandparent or a grandchild visiting, and we have an extra spot, we'll let them park there. 1496 02:08:45,800 --> 02:08:51,760 One thing that typically happens, it's really interesting in these TOD projects is that you've 1497 02:08:51,760 --> 02:08:59,160 got municipal parking in plentiful municipal parking that's typically underutilized during 1498 02:08:59,160 --> 02:09:01,760 the times where you would typically have a visitor. 1499 02:09:02,180 --> 02:09:06,400 And so if there's a collaborative approach to the issue, what often happens, so for 1500 02:09:06,400 --> 02:09:11,540 example, downward growth, our leasing manager can contact the village and get an overnight 1501 02:09:11,540 --> 02:09:15,220 I pass for a municipal lot D for one or two or three nights. 1502 02:09:15,380 --> 02:09:17,500 You've got to be out of there by, you know, 1503 02:09:17,540 --> 02:09:19,280 seven in the morning or something, 1504 02:09:19,380 --> 02:09:22,480 but they're able to park overnight in a municipal lot. 1505 02:09:22,580 --> 02:09:27,600 And it just maximizes the utilization of those spaces. 1506 02:09:28,040 --> 02:09:29,720 Does that answer the question? 1507 02:09:30,260 --> 02:09:33,060 I think so, I, you know, as long as the village 1508 02:09:33,060 --> 02:09:36,060 has an approach to doing that with these buildings, 1509 02:09:37,540 --> 02:09:40,980 I think that's, we just, we can't park on the street. 1510 02:09:40,980 --> 02:09:47,620 we know that. Yeah, right after 2 a.m. it's pretty typical. I'll jump back to 1511 02:09:47,620 --> 02:09:52,160 Downers Grove. Similarity there is just that they, you know, not too long ago 1512 02:09:52,160 --> 02:09:55,540 opened up a new parking structure and so there's an ability to park there 1513 02:09:55,540 --> 02:10:01,400 overnight. It's a couple block walk but this is an urban environment and so I 1514 02:10:01,400 --> 02:10:07,320 don't think that that's that unusual to walk a couple blocks but I don't 1515 02:10:07,320 --> 02:10:12,180 know if the rules have been set for how the parking garage will work. It's really actually 1516 02:10:12,180 --> 02:10:20,600 not that common of an occurrence, but people tend to figure it out. But it is something 1517 02:10:20,600 --> 02:10:23,980 that I'd be curious if the village has a reaction to that. 1518 02:10:24,580 --> 02:10:30,040 Yeah, it just, it becomes an issue when you push the parking numbers down. That's 1519 02:10:30,040 --> 02:10:31,340 my only concern. 1520 02:10:32,440 --> 02:10:34,940 So I appreciate your comments. 1521 02:10:36,420 --> 02:10:38,400 Stacy, do you want to jump in on that one? 1522 02:10:39,300 --> 02:10:40,780 I saw, go ahead. 1523 02:10:41,040 --> 02:10:43,360 I really don't have anything to ask Kelly. 1524 02:10:43,620 --> 02:10:45,620 Is there something that was popping into your head? 1525 02:10:46,120 --> 02:10:48,080 Katie raised your hand. Go ahead, Katie. 1526 02:10:48,660 --> 02:10:56,940 I just wanted to note that it is a suggested condition of approval regarding the rooftop units. 1527 02:10:56,940 --> 02:11:00,760 that all visible rooftop unit, mechanical units, 1528 02:11:00,960 --> 02:11:03,840 see the height, not to exceed that 1529 02:11:03,840 --> 02:11:06,760 of the overall maximum height deviation granted. 1530 02:11:07,540 --> 02:11:11,580 I don't know if that resolves the concern 1531 02:11:11,580 --> 02:11:13,100 for Commissioner Rodiman or not. 1532 02:11:13,440 --> 02:11:16,260 Katie, by the way, I hate to interrupt 1533 02:11:16,260 --> 02:11:18,780 Commissioner Rodiman, but we're happy to agree to that. 1534 02:11:19,140 --> 02:11:23,260 You know, thoughtful screening of rooftop mechanical units. 1535 02:11:23,420 --> 02:11:26,420 I don't really think it's gonna affect folks 1536 02:11:26,420 --> 02:11:30,260 in the way that we're talking about it could be wrong but we'd be happy to 1537 02:11:30,260 --> 02:11:34,820 screen it no problem. Well it and it wasn't necessarily the issue of you know 1538 02:11:34,820 --> 02:11:39,740 I sometimes think that to see the piece of equipment just fine because it's 1539 02:11:39,740 --> 02:11:45,720 smaller in footprint than trying to wrap it with a piece of screening I do 1540 02:11:45,720 --> 02:11:50,900 think if it's going to be a noisy piece of equipment and if you can you 1541 02:11:50,900 --> 02:11:58,560 even a low screen sometimes helps mitigate that and a low screen can also help kind of blend it out 1542 02:11:59,280 --> 02:12:05,280 and that's what the parapets kind of do too. So I think it's just something to be aware of. I know we 1543 02:12:05,280 --> 02:12:10,960 can't build a screen higher than your highest whatever we're going to permit before it was 1544 02:12:10,960 --> 02:12:15,860 described it was going to be the elevator overrun. It's now clear that it'll be the makeup 1545 02:12:15,860 --> 02:12:29,360 Yeah, it's the make up area unit that they do have these really cool clip on screens and it does set off of the unit a couple of inches, but it does help to push noise up. They're really not that noisy. 1546 02:12:30,620 --> 02:12:39,060 But I think, you know, we're going actually a little worried about is the top of that screening going two or three inches. 1547 02:12:39,060 --> 02:12:42,460 is over the top of the MAU and then we get to CFO 1548 02:12:42,460 --> 02:12:43,600 and we can't pull it 1549 02:12:43,600 --> 02:12:46,060 because there are screens like two inches high 1550 02:12:46,060 --> 02:12:48,580 but that's just me being paranoid. 1551 02:12:50,220 --> 02:12:51,300 All right, thank you. 1552 02:12:52,020 --> 02:12:52,600 Is this that? 1553 02:12:53,020 --> 02:12:53,400 Oh, go ahead. 1554 02:12:53,900 --> 02:12:55,320 I just want to add one more thing 1555 02:12:55,320 --> 02:12:57,340 that the village does allow people to park overnight 1556 02:12:57,340 --> 02:12:58,680 in the municipal parking lots. 1557 02:12:59,740 --> 02:13:01,100 So the Crescent Glenwood station 1558 02:13:01,100 --> 02:13:02,640 would be available for visitors. 1559 02:13:03,420 --> 02:13:05,140 It's kind of the same setup as Donner's Grove 1560 02:13:05,140 --> 02:13:06,220 where people would have to split 1561 02:13:06,220 --> 02:13:07,860 before the commuters came into the parking lot 1562 02:13:07,860 --> 02:13:08,220 in the morning. 1563 02:13:08,220 --> 02:13:12,820 but that would be available for use of folks whenever they're staying overnight. 1564 02:13:13,240 --> 02:13:17,540 I commend you for having that flexibility. Not all villages do that, and it's smart, 1565 02:13:17,660 --> 02:13:23,380 and it allows you to utilize and underutilize the outset. So that's really good news. I appreciate 1566 02:13:23,380 --> 02:13:27,860 that Commissioner Rodham and bringing that up. And Kelly, thank you for grabbing that 1567 02:13:27,860 --> 02:13:33,840 information for us to answer that question. I appreciate it. Additional commissioners have, 1568 02:13:33,840 --> 02:13:43,100 Yes, go ahead, Laura. You need to... Yeah. Thank you. Is there a retail... Is there a 1569 02:13:43,100 --> 02:13:51,080 parking space for the retail spot and door? The second question is, will the 1570 02:13:51,080 --> 02:13:55,900 garbage no longer be needed to be outside to be collected? Will they be 1571 02:13:55,900 --> 02:13:57,600 able to come into the building to collect it? 1572 02:14:00,590 --> 02:14:02,250 So two questions there. We 1573 02:14:02,250 --> 02:14:06,950 We currently do not have a provision for any retail customer parking. 1574 02:14:07,430 --> 02:14:12,490 We believe we can allocate one of our internal parking spaces to an employee there. 1575 02:14:14,530 --> 02:14:20,110 And then regarding the trash question, I think I understood that, to me, is there a way 1576 02:14:20,110 --> 02:14:23,390 to pull the commercial trash inside of the building? 1577 02:14:23,670 --> 02:14:24,930 Did I understand that correctly? 1578 02:14:26,010 --> 02:14:31,030 Oh, just back in May, I thought the trash was going to be collected on the sidewalk 1579 02:14:31,030 --> 02:14:39,230 on Crescent? Is that still the case? Yes that that's still the case so the the 1580 02:14:39,230 --> 02:14:42,810 easiest way for us to get the trash in and out of the building is there's a 1581 02:14:42,810 --> 02:14:47,910 slight topography change from where the trash is to the Crescent Street and 1582 02:14:47,910 --> 02:14:52,750 you can't really push trash up no when it's full so even though it's a slight 1583 02:14:52,750 --> 02:14:59,110 grade change it's continuing to be planned on Crescent but designed to be 1584 02:14:59,110 --> 02:14:59,970 is not 1585 02:15:00,000 --> 02:15:06,460 At least interruptive is possible. Trash stinks. I mean, I don't mean to be funny or 1586 02:15:06,460 --> 02:15:13,200 punny, but it's something that's hard to deal with. It really is. So this has worked 1587 02:15:13,200 --> 02:15:18,980 for us in other projects, and you know, what does end up happening is you have a 1588 02:15:18,980 --> 02:15:24,000 chance to have your trash, the trash truck double parked for a short 1589 02:15:24,000 --> 02:15:28,040 period of time while they're pulling the bins out, dumping them, and putting 1590 02:15:28,040 --> 02:15:34,100 them back. But they do it very quickly and try to get out of the way as quickly as possible. 1591 02:15:35,620 --> 02:15:43,020 Thank you. All right, thank you. Plan commission members, anybody else have a question for the 1592 02:15:43,020 --> 02:15:43,580 petitioner? 1593 02:15:47,500 --> 02:15:53,100 I don't see anybody else unmuting. So I think what we're going to do at this point 1594 02:15:53,100 --> 02:15:57,940 because of the time is take a five minute break. I've been asked by a couple people if we 1595 02:15:57,940 --> 02:16:04,420 can do that. My computer clocks is 902 so at 907 we are going to start up or okay 1596 02:16:04,420 --> 02:16:07,920 just jump to 903. 908 we're going to start up again so please five minute 1597 02:16:07,920 --> 02:16:11,760 break and then we'll see you back here. My 1598 02:21:04,690 --> 02:21:06,630 clock says 908. 1599 02:21:08,750 --> 02:21:10,010 Not sure that we have 1600 02:21:10,010 --> 02:21:15,450 everybody here but Kelly the next section was I was going to go into was 1601 02:21:15,450 --> 02:21:18,650 the public comment assuming the Planned Commission members haven't thought 1602 02:21:18,650 --> 02:21:22,930 of a question for the petitioner. Are you the one reading letters or is Katie doing that? 1603 02:21:23,590 --> 02:21:26,550 Cole is going to read the public comments into this record. 1604 02:21:27,270 --> 02:21:33,610 Okay. Oh, there he is. I see him now. Okay. Okay. All right. Well, that's not going to start yet. 1605 02:21:33,750 --> 02:21:46,650 I'm going to ask the plan commission members if they are done. I want to ensure that no one had thought of a question before we move away from the plan commission asking the petitioner if they have anything. 1606 02:21:48,570 --> 02:21:52,370 So, if I don't see anything, okay, then we'll go into the section for public comment. 1607 02:21:53,090 --> 02:21:57,550 And I, Cole, I know you've got a number of things to read into the record. 1608 02:21:57,850 --> 02:22:02,410 I also wanted to ensure, are you going to be the one asking if there's anybody on the 1609 02:22:02,410 --> 02:22:07,530 phone that also has a letter that they've written and will they, do they have a preference 1610 02:22:07,530 --> 02:22:10,050 whether they want to speak tonight or have their letter written? 1611 02:22:11,430 --> 02:22:12,410 Sure, we can do that. 1612 02:22:12,610 --> 02:22:16,030 And then Kelly and Stacey, if you want to let me know if anyone's raising their 1613 02:22:16,030 --> 02:22:21,350 hand when we ask that. So we can have them talk please. Okay, that'd be great. I just wanted to 1614 02:22:21,350 --> 02:22:27,030 add that I will be administering the three minute clock to keep everybody on track. Okay, thanks 1615 02:22:27,030 --> 02:22:33,550 Kelly. Very good. Okay, we have 11 written comments so we'll do those first before going 1616 02:22:33,550 --> 02:22:39,690 into everyone's comments on Zoom. The first comment is going to be from Kay Corfoot. 1617 02:22:40,510 --> 02:22:43,950 We do not have an address for this because it was submitted via an email, 1618 02:22:43,950 --> 02:22:53,610 But their comment reads, when you list new apartment buildings being built in Glenelon, it would be informative to state if they would be rentals or condos to purchase. Thank you. 1619 02:22:56,010 --> 02:23:01,250 The next comment is from Samantha Martin at 431 Ridgewood Avenue. 1620 02:23:02,210 --> 02:23:12,370 Their comment reads, I am writing to comment on the proposed apartment complex. As a new resident of Glenelon, I'm surprised at how many apartment buildings this town is currently building and considering to build. 1621 02:23:12,370 --> 02:23:17,270 I have nothing against apartment buildings, but I would not have moved here if so many were going up 1622 02:23:17,270 --> 02:23:23,490 It will ruin the aesthetic and feel the town and crowd the downtown area. I vote no on this project. Thank you 1623 02:23:28,600 --> 02:23:35,440 The next comment is from Mike Wheeler their address is 44466 H Pennsylvania Avenue 1624 02:23:36,520 --> 02:23:40,520 Well just a moment. We do have a Mike Wheeler in the audience. Mr. Wheeler 1625 02:23:40,520 --> 02:23:46,120 Would you rather speak to the plan commissioner? Would you like your if you would like to speak to the plan commission? 1626 02:23:46,120 --> 02:23:49,660 please raise your zoom hand otherwise we'll go ahead and read the comments into the record. 1627 02:23:52,590 --> 02:23:57,390 I don't see a hand raised so go ahead Cole. Perfect. It is exciting to hear that holiday 1628 02:23:57,390 --> 02:24:02,470 properties has returned to further their proposal at 460 C Crescent Avenue. This property has remained 1629 02:24:02,470 --> 02:24:07,430 vacant for far too long. As a nearby resident I have seen dangerous behavior happening on the 1630 02:24:07,430 --> 02:24:11,390 current building's roof and look forward to a new structure they'll be cared for by the owner. 1631 02:24:11,970 --> 02:24:15,590 The deviations that are being requested did not be on reason for a building of this type 1632 02:24:15,590 --> 02:24:17,630 going into a footprint of this size. 1633 02:24:18,210 --> 02:24:20,250 The variance on that height is relatively small 1634 02:24:20,250 --> 02:24:21,950 in comparison to the overall building. 1635 02:24:22,610 --> 02:24:24,090 The parking solid should easily service 1636 02:24:24,090 --> 02:24:25,510 the people living within the building, 1637 02:24:25,890 --> 02:24:27,930 especially with so much within walking distance, 1638 02:24:28,390 --> 02:24:30,390 vehicle sharing programs, and ride sharing. 1639 02:24:31,150 --> 02:24:33,050 It is wonderful to see the development on Main Street 1640 02:24:33,050 --> 02:24:35,250 and Lane Street underway in near and completion. 1641 02:24:35,890 --> 02:24:38,030 These areas have definitely drawn the attention of vendors 1642 02:24:38,350 --> 02:24:40,270 and this new development will continue to draw people 1643 02:24:40,270 --> 02:24:41,910 into the downtown area of Glenelon. 1644 02:24:42,170 --> 02:24:43,490 Thank you for the opportunity to comment. 1645 02:24:46,630 --> 02:24:49,570 The next comment will be from Lee Ann Howell. 1646 02:24:50,250 --> 02:24:52,970 They are located at 713 Kenilworth Avenue. 1647 02:24:55,820 --> 02:25:00,220 Minimal building setback is not pedestrian friendly or in keeping with older parts of downtown. 1648 02:25:01,060 --> 02:25:07,020 Streetscape on the south side along Crescent is particularly severe, barren with no plantings except young trees. 1649 02:25:07,760 --> 02:25:12,520 It will be terrible to walk along the sidewalk in the summer, heat rating off a masonry wall. 1650 02:25:13,020 --> 02:25:18,260 On the east side, in addition to a minimal setback and no planting, what is west with 1651 02:25:18,260 --> 02:25:19,580 the fence along the street? 1652 02:25:20,000 --> 02:25:21,840 How can drivers let a passenger out of a car? 1653 02:25:22,420 --> 02:25:23,140 How will snow be cleared? 1654 02:25:27,700 --> 02:25:34,020 The next comment is from Jena Sampson at 470 Pennsylvania Avenue, Glen Ellen. 1655 02:25:35,860 --> 02:25:40,360 My husband and I own and live in a townhouse directly to the north at the proposed development. 1656 02:25:40,860 --> 02:25:44,680 We will have a direct view of the north side of the building from our second floor 1657 02:25:44,680 --> 02:25:49,800 living room as well as our third floor guest room and our fourth floor family room. I'm concerned 1658 02:25:49,800 --> 02:25:53,780 by the many variances that are requested for this development. While development of this 1659 02:25:53,780 --> 02:25:57,280 property is desirable, having a development that meets our current zoning requirements 1660 02:25:57,280 --> 02:26:01,800 be good for the entire area. Homeowners should be able to rely upon zoning code to protect 1661 02:26:01,800 --> 02:26:05,940 their investment in their homes. By continually granting many variances to the code, 1662 02:26:06,220 --> 02:26:09,780 you undermine the integrity of the zoning code itself. Continually granting zoning 1663 02:26:09,780 --> 02:26:13,800 variations undermines the look and feel of our downtown area. I urge you to stick to 1664 02:26:13,800 --> 02:26:16,060 zoning requirements as you review this proposed development. 1665 02:26:16,980 --> 02:26:18,520 My first specific concern is parking. 1666 02:26:19,400 --> 02:26:21,240 This area already has a significant shortage 1667 02:26:21,240 --> 02:26:23,220 of parking spaces and developers are requesting 1668 02:26:23,220 --> 02:26:25,540 to cut their acquired parking spaces by 47 spaces. 1669 02:26:26,340 --> 02:26:27,640 Even with the new parking garage 1670 02:26:27,640 --> 02:26:28,700 on the south side of the tracks, 1671 02:26:29,120 --> 02:26:30,720 parking in the north side will be very short. 1672 02:26:31,300 --> 02:26:33,140 Renters, shoppers and vinyls will not want to park 1673 02:26:33,140 --> 02:26:34,760 on the south side and walk across the tracks 1674 02:26:34,760 --> 02:26:36,220 to get to their apartment or destination. 1675 02:26:37,080 --> 02:26:39,240 I think it is important that the full requirement 1676 02:26:39,240 --> 02:26:41,300 of parking spaces be provided in this development. 1677 02:26:41,300 --> 02:26:45,400 It is reasonable to think that every renter in this proposed development will have a car. 1678 02:26:45,960 --> 02:26:50,480 Yes, we are very close to the metro station, but even renters who work in downtown Chicago 1679 02:26:50,480 --> 02:26:54,040 will need a car to get basing necessities such as groceries and prescriptions. 1680 02:26:54,780 --> 02:26:58,960 On Friday and Saturday evenings on Pennsylvania Avenue, cars are often double parked and 1681 02:26:58,960 --> 02:27:02,360 parked blocking the entrance and or exit of the legacy condominiums. 1682 02:27:03,140 --> 02:27:07,200 The many restaurants in the area make nighttime parking especially a problem, particularly 1683 02:27:07,200 --> 02:27:13,000 once we go back to full capacity inside dining. Currently, this property is helping to offset 1684 02:27:13,000 --> 02:27:17,360 the parking shortage as visitors use the law for parking. When developed, this extra parking will 1685 02:27:17,360 --> 02:27:21,380 no longer be available for visitors and parking will be harder to find for residents that occupy 1686 02:27:21,380 --> 02:27:25,440 this building. Please require the full amount of parking spaces as determined by the zoning code. 1687 02:27:27,180 --> 02:27:32,180 My second concern is the lack of normal setbacks for the building. By reducing the setbacks 1688 02:27:32,180 --> 02:27:35,380 from Glenwood Avenue and the back of the building, the building will look much larger 1689 02:27:35,380 --> 02:27:39,440 from our viewpoint to the north. It will also not allow landscaping around the back that would 1690 02:27:39,440 --> 02:27:44,180 help beautify, soften, and blend the new building into the area. It will also make the area less 1691 02:27:44,180 --> 02:27:48,580 safe for pedestrians, especially along Glenwood Avenue. The corner of Glenwood Avenue in Pennsylvania 1692 02:27:48,580 --> 02:27:52,760 will need some traffic control and crosswalks added, as it is already difficult to cross 1693 02:27:53,300 --> 02:27:57,580 that corner. The increased traffic that this development will bring will make walking even 1694 02:27:57,580 --> 02:28:01,480 less safe than it is currently. Increased traffic will make an area difficult and dangerous 1695 02:28:01,480 --> 02:28:07,060 exit from the legacy even riskier. I also object to the height variance requested, 1696 02:28:07,580 --> 02:28:10,360 the size of this building will dwarf most buildings in downtown Glen Elm. 1697 02:28:10,680 --> 02:28:14,220 The current zoning height restriction is sufficiently tall. Why do we have a height 1698 02:28:14,220 --> 02:28:18,140 restriction if we do not enforce it? The townhouses in our development have 1699 02:28:18,140 --> 02:28:20,740 rooftop balconies that enjoy the views of the village to the south 1700 02:28:20,740 --> 02:28:23,640 and are a significant part of the enjoyment and value of our units. 1701 02:28:24,320 --> 02:28:27,740 Allowing a height variance will impinge on those views especially for the six homes on 1702 02:28:27,740 --> 02:28:28,500 in Pennsylvania Avenue. 1703 02:28:29,120 --> 02:28:30,360 It will lower our poverty values 1704 02:28:30,360 --> 02:28:31,980 and decrease the enjoyment of our homes. 1705 02:28:32,600 --> 02:28:34,700 The massive blocks file, especially in the request 1706 02:28:34,700 --> 02:28:36,180 to remove the step back requirement 1707 02:28:36,180 --> 02:28:37,460 above 45 feet is granted. 1708 02:28:37,880 --> 02:28:38,720 A couple of minutes. 1709 02:28:40,320 --> 02:28:40,760 Thank you. 1710 02:28:44,450 --> 02:28:48,930 The next comment is from Lee Marks at 475 Hawthorne. 1711 02:28:50,390 --> 02:28:52,410 The building design for Glenwood Station 1712 02:28:52,410 --> 02:28:53,570 should be deemed unacceptable. 1713 02:28:54,130 --> 02:28:56,250 Is the typical anywhere USA design 1714 02:28:56,250 --> 02:28:58,150 that most every developer submits to a town? 1715 02:28:58,690 --> 02:29:00,050 Any building design for Glenwood 1716 02:29:00,050 --> 02:29:04,870 should be reflective of our historic architecture, which began as recriable and on to Italian 1717 02:29:04,870 --> 02:29:10,550 at in the 1880s and 1890s. In addition, the building is too tall for the site. This is 1718 02:29:10,550 --> 02:29:14,990 a standalone building, and if overly large, will stand out like a sore thumb on the Chesney 1719 02:29:14,990 --> 02:29:19,330 site. I would ask the developer to take a look at the outstanding design on the office building 1720 02:29:19,330 --> 02:29:24,430 at 486 Dwayne Street, second building west of Park Boulevard on the north side of Dwayne. 1721 02:29:24,750 --> 02:29:28,410 It is an exceptional contemporary interpretation of American federal period architecture. 1722 02:29:28,910 --> 02:29:32,630 It is obvious that the developer who erected this building spent time touring Glenelon prior 1723 02:29:32,630 --> 02:29:34,090 to presenting this project to the village. 1724 02:29:34,590 --> 02:29:38,590 In my over 50 years of involvement in historic preservation in Glenelon, this is the only 1725 02:29:38,590 --> 02:29:42,510 builder who hit the nail on the head as far as outstanding architectural design is concerned. 1726 02:29:43,070 --> 02:29:46,010 I would ask that the developer for Glenelon Station consider meeting with the local 1727 02:29:46,010 --> 02:29:50,010 architect and some of the preservation people in Glenelon to get a better handle on 1728 02:29:50,010 --> 02:29:51,490 what would be appropriate for the Misesli site. 1729 02:29:52,090 --> 02:29:54,730 The architecture of Glenelon Station doesn't need to be a copy of a specific 1730 02:29:54,730 --> 02:29:58,330 style, but it makes sense design wise, so it contributes to clinical analysis to our 1731 02:29:58,330 --> 02:29:58,850 extra escapes. 1732 02:30:00,000 --> 02:30:04,560 Architect Jamie Simonette said that he would be happy to meet and discuss various design 1733 02:30:04,560 --> 02:30:08,520 improvements. With my work in historic preservation, I hear a tremendous number of comments from 1734 02:30:08,520 --> 02:30:12,060 residents who have said to me that while they are not opposed to apartments and condos coming 1735 02:30:12,060 --> 02:30:16,140 to Glen Island, they absolutely do not want Glen Island to become another Arlington Heights 1736 02:30:16,140 --> 02:30:20,500 or Lombard, where suddenly our town center becomes a canyon surrounded by an overly 1737 02:30:20,500 --> 02:30:21,340 tall building. 1738 02:30:25,020 --> 02:30:31,840 The next comment is from Lovis Walter at 124 Newton Avenue. They are 1739 02:30:31,840 --> 02:30:34,840 to comment is simply how many of the proposed departments will be designed affordable. 1740 02:30:38,900 --> 02:30:43,860 The next comment is from Adam Kruser. They are a form of chair of the Environmental Commission 1741 02:30:43,860 --> 02:30:49,860 and a current delegate for the International Dark Sky Association. Good morning and thank 1742 02:30:49,860 --> 02:30:54,440 you for the opportunity to comment. I'm concerned about outdoor lighting. As the village has 1743 02:30:54,440 --> 02:30:58,800 tried to do with its fixtures on Roosevelt and within the CBD with commercial developments, 1744 02:30:59,300 --> 02:31:03,060 the village should address good outdoor lighting design. The proposed projects at 1745 02:31:03,060 --> 02:31:07,220 Ms. Jezny and on Main Street should include light fixtures and bulbs that minimize outdoor 1746 02:31:07,220 --> 02:31:13,440 light pollution. All fixtures should direct light down, not up and or out. Bulbs should 1747 02:31:13,440 --> 02:31:18,520 not be more than 2,700 Kelvin and brightness levels should be addressing controlled. As 1748 02:31:18,520 --> 02:31:22,280 your local IDA delegate, I would like the opportunity to digress these concerns with 1749 02:31:22,280 --> 02:31:25,460 the planning department and the board. These are simple measures that will not affect 1750 02:31:25,460 --> 02:31:27,680 price, energy savings, or security. Thank you. 1751 02:31:31,040 --> 02:31:31,940 Is that the end of it? 1752 02:31:32,480 --> 02:31:33,380 That is the end, yes. 1753 02:31:33,380 --> 02:31:37,100 Okay. Thank you. Kind of guessing. I appreciate that. 1754 02:31:38,000 --> 02:31:40,180 Oh, I'm sorry. We have a couple more comments. I'm sorry. 1755 02:31:40,580 --> 02:31:40,980 That's okay. 1756 02:31:41,160 --> 02:31:42,520 That was the end of that particular comment. 1757 02:31:44,500 --> 02:31:46,000 And then we have four more. 1758 02:31:47,120 --> 02:31:49,800 The next comment is from the League of Women Voters. 1759 02:31:51,520 --> 02:31:55,360 It is titled Public Comments for the Glen Ellen Plan Commission meeting November 12, 2020. 1760 02:31:56,400 --> 02:32:02,000 In light of the newly published draft of the Glen Ellen Comprehensive Plan and the positions held by the League of Women Voters Glen Ellen. 1761 02:32:02,000 --> 02:32:04,560 Thank you for the opportunity to provide the following comments. 1762 02:32:05,080 --> 02:32:08,760 The League of Women Voters of Glen Ellin is strongly committed to the act of civic engagement 1763 02:32:08,760 --> 02:32:09,420 in our community. 1764 02:32:10,200 --> 02:32:13,820 Based on that important tenet, we are asking the Glen Ellin Planning Commission to not 1765 02:32:13,820 --> 02:32:16,920 only evaluate the new holiday development plan with station at the Machesney and Miller 1766 02:32:16,920 --> 02:32:21,080 location based on the prescribed village codes but also whether it meets the present 1767 02:32:21,080 --> 02:32:22,420 and future housing needs of the village. 1768 02:32:23,120 --> 02:32:27,620 The newly designed, the newly released draft of the comprehensive plan speaks 1769 02:32:27,620 --> 02:32:31,260 to not only opening opportunities for high density development that can form with 1770 02:32:31,260 --> 02:32:35,400 surrounding character of buildings but also that it promote attainable housing and a variety of 1771 02:32:35,400 --> 02:32:39,760 price points to address the financial needs of seniors, young professionals, new families, 1772 02:32:40,040 --> 02:32:44,120 as well as workers in our local retail and service industries. It is important to provide this 1773 02:32:44,120 --> 02:32:48,540 developer and others with a clear message that a variety of price points matter and can be 1774 02:32:48,540 --> 02:32:53,060 maintained in a development, though a collaborative effort with the village. We 1775 02:32:53,060 --> 02:32:56,560 include a section of the village's draft of this new comprehensive plan that speaks clearly 1776 02:32:56,560 --> 02:33:01,960 to this issue and then they quoted a section of the comprehensive plan that reads promote 1777 02:33:01,960 --> 02:33:06,840 mixed income development provided for affordable attainable housing as future developments occur. 1778 02:33:07,240 --> 02:33:11,760 The village should also consider dot to dot promote higher density residential development 1779 02:33:11,760 --> 02:33:16,380 that provides housing for a variety of income levels. Such mixed income development allows 1780 02:33:16,380 --> 02:33:20,760 lower income families to be included within and among higher income residents rather than 1781 02:33:20,760 --> 02:33:25,440 concentrating into one area. This is supported by an inclusive stable and diverse community 1782 02:33:25,440 --> 02:33:27,700 and creates desirable attainable housing options 1783 02:33:27,700 --> 02:33:30,240 that blend in the village's urban fabric. 1784 02:33:31,320 --> 02:33:33,400 Incentives to encourage developers 1785 02:33:33,400 --> 02:33:35,640 to incorporate a percentage of the low market rate, 1786 02:33:35,760 --> 02:33:37,160 affordable units should be promoted, 1787 02:33:37,540 --> 02:33:39,080 such as fee waivers, tax abatements, 1788 02:33:39,380 --> 02:33:41,540 and expedited approval into a higher density, 1789 02:33:41,700 --> 02:33:43,500 mixed income residential development. 1790 02:33:44,060 --> 02:33:45,320 Thank you for your consideration. 1791 02:33:45,960 --> 02:33:48,300 And then it's from Kristin B. Malone 1792 02:33:48,300 --> 02:33:49,320 and Erica Nelson, 1793 02:33:49,800 --> 02:33:51,480 Co-presidents of the League of Women Voters. 1794 02:33:52,580 --> 02:33:53,140 Okay. 1795 02:33:56,400 --> 02:34:00,000 This one is from Jamie Simonette. 1796 02:34:01,060 --> 02:34:03,720 Just a moment. I believe that Jamie is on also, 1797 02:34:04,160 --> 02:34:07,540 and I just would like to see if he would rather speak to the plan commission. 1798 02:34:08,200 --> 02:34:08,220 Sure. 1799 02:34:09,320 --> 02:34:10,640 Maybe he has gotten off. 1800 02:34:12,630 --> 02:34:14,210 Unless he's JJ S. 1801 02:34:14,790 --> 02:34:15,050 He might. 1802 02:34:15,450 --> 02:34:18,770 It's actually Daniel Simonite. So yeah, that's him. 1803 02:34:19,490 --> 02:34:22,010 Jamie, would you like to speak to the plan commission directly? 1804 02:34:22,010 --> 02:34:26,250 If so, please raise your zoom hand. If not, we'll go ahead and read your comment into the record. 1805 02:34:28,760 --> 02:34:32,380 And I don't see a hand, so go ahead and proceed full. 1806 02:34:32,900 --> 02:34:39,840 Perfect. I am disappointed that what is proposed is basically a carbon copy of what is currently being constructed on Main Street. 1807 02:34:40,300 --> 02:34:44,500 Another oversized apartment complex that does not fit into our village's downtown vernacular. 1808 02:34:44,500 --> 02:34:54,500 What I find hard to understand is how far this project progressed when it does not comply with the village's current C5B zoning, or come close to what is described in the comprehensive plan adopted in 2001. 1809 02:34:55,400 --> 02:35:03,860 A quick study of the posted first floor plan reveals a project that denies the public pedestrian level among Crescent Boulevard of any retail spaces or store funds. 1810 02:35:04,580 --> 02:35:10,640 The South Sun facing facade is 318 feet long, but does not provide a single public community or business opportunity. 1811 02:35:10,640 --> 02:35:17,140 The developer is using a 60-foot frontage at the prime intersection of Crescent and Glenwood for the apartment lobby. 1812 02:35:17,700 --> 02:35:24,360 The remaining 258 linear feet is nothing but a blank wall with two exhaust vents and two 25-foot wide overhead doors, 1813 02:35:24,620 --> 02:35:27,080 providing access to the parking garage and hides below. 1814 02:35:28,080 --> 02:35:31,280 The only retail space on the property is north on Glenwood off of the Boulevard. 1815 02:35:31,680 --> 02:35:38,200 The 100 linear feet of this facade is divided between the building's lobby and a minuscule 55 feet of retail. 1816 02:35:38,200 --> 02:35:44,720 retail. How can only 12% of the structures public facade be dedicated to retail in our 1817 02:35:44,720 --> 02:35:51,600 downtown central business district be deemed acceptable? That's 428.70 feet total of furniture 1818 02:35:51,600 --> 02:35:56,900 divided by 55 feet of proposed retail. Please insist that the developer excavate down another 1819 02:35:56,900 --> 02:36:02,900 level and relocate the proposed street level parking so that the west end of Crescent 1820 02:36:02,900 --> 02:36:07,560 Boulevard can become a vibrant extension of our downtown in lieu of a lifeless 1821 02:36:07,560 --> 02:36:12,180 dead end. As a business owner here in town, I am pro-development, but I ask that the village 1822 02:36:12,180 --> 02:36:16,520 enforce our zoning laws, provide variations that are only minor in nature, and make a 1823 02:36:16,520 --> 02:36:21,200 common sense when driven by irregularities in pre-existing, non-conforming conditions. 1824 02:36:22,100 --> 02:36:26,020 Variations awarded to new construction should be far and few between. As a Glen Island 1825 02:36:26,020 --> 02:36:30,380 homeowner since 1995, I believe we deserve better. Please do not slam this through 1826 02:36:30,380 --> 02:36:31,080 like this predecessor. 1827 02:36:32,340 --> 02:36:39,620 We have one more comment. This one is from Peggy Oduhaven at 771 Revere Road. 1828 02:36:40,640 --> 02:36:45,500 We have been happy residents here for 28 years. I think our time would benefit from this development. 1829 02:36:46,180 --> 02:36:48,620 The building is attractive and blends well with the existing buildings. 1830 02:36:49,220 --> 02:36:53,060 Occupants would have range from young professionals who need to be near the train for transitioning residents, 1831 02:36:53,620 --> 02:36:56,200 looking to downsize from their larger glenone homes. 1832 02:36:56,640 --> 02:36:59,440 It will provide additional parking and amenities residents can utilize. 1833 02:36:59,980 --> 02:37:02,680 Introducing younger residents to our wonderful town and all it has to offer 1834 02:37:02,680 --> 02:37:08,040 promotes future home sales as well, win-win Glen Ellen. And that is all the 1835 02:37:08,040 --> 02:37:14,320 written comments. Thank you. Okay Cole, thank you very much. I there is one comment 1836 02:37:14,320 --> 02:37:19,820 especially about the up lighting. I would you know if you like to address it 1837 02:37:19,820 --> 02:37:25,000 or respond to that that would be great. I know that would be true or is that 1838 02:37:25,000 --> 02:37:26,580 would be Chris? 1839 02:37:33,860 --> 02:37:39,460 I admire the desire to reduce and eliminate light pollution. I 1840 02:37:39,460 --> 02:37:47,580 actually share that generally. I also love the light buildings that are 1841 02:37:47,580 --> 02:37:52,320 beautiful and so you know my sense is I do know that there are some my 1842 02:37:52,320 --> 02:37:55,800 up lighting elements and the sconces on I believe the south side of the 1843 02:37:55,800 --> 02:38:03,200 building and on the east side of the building. It's incorporated in the design. I don't think 1844 02:38:03,200 --> 02:38:12,240 it's excessive. I think it's appropriate for the site. I would be sad if we had to 1845 02:38:12,240 --> 02:38:17,300 eliminate it to be totally candid. But if it was something that is really a sticking 1846 02:38:17,300 --> 02:38:20,460 point, we could look at that. Chris, I'd invite you to weigh in. 1847 02:38:21,700 --> 02:38:27,320 Yeah this is something that you know we've we've looked at like I said we've we 1848 02:38:27,320 --> 02:38:34,820 feel the nighttime view is just as important as the day you know ways this 1849 02:38:34,820 --> 02:38:38,980 has been handled you know in other spots is these turn off at a certain time at 1850 02:38:38,980 --> 02:38:45,100 night you know maybe it's 10 o'clock at night they do turn turn off you know 1851 02:38:45,100 --> 02:38:56,860 And, you know, this is again, part of the feel of the building that we felt at night it was important to give it a glow. It's going to be on a prominent corner. 1852 02:38:58,560 --> 02:39:00,100 Okay. All right. Thank you. 1853 02:39:02,860 --> 02:39:03,220 All right. 1854 02:39:05,480 --> 02:39:14,200 I've got a little note from Stacy here because she passed it to me about the affordable housing if Kelly or Katie wanted to comment about that. 1855 02:39:15,840 --> 02:39:24,820 Sure, I'd be happy to. So the village actually is in compliance with the Illinois Affordable 1856 02:39:24,820 --> 02:39:32,220 Housing Planning and Appeal Act that was adopted in 2003. That law required local governments 1857 02:39:32,220 --> 02:39:38,620 and communities greater than a thousand in population to provide at least 10% of their 1858 02:39:38,620 --> 02:39:44,640 total year on housing stock to be affordable and then they benchmark 1859 02:39:44,640 --> 02:39:52,520 affordability based on 30% of your the area median income. The area median income 1860 02:39:52,520 --> 02:39:59,540 for the Chicago area as delineated by the Census Bureau, the Metropolitan 1861 02:39:59,540 --> 02:40:03,780 and statistical area is $63,327. 1862 02:40:04,980 --> 02:40:09,360 So affordable would be 30% of that. 1863 02:40:10,060 --> 02:40:16,100 The village does provide 15, almost 16%, 15.9% exactly 1864 02:40:16,380 --> 02:40:22,200 as of the 2018 Illinois Housing Development Authority report 1865 02:40:22,960 --> 02:40:25,420 which they prepare every five years 1866 02:40:25,420 --> 02:40:27,940 in accordance with the act they mentioned. 1867 02:40:27,940 --> 02:40:33,720 So, at this time, the village is not required to adopt an affordable housing plan and does 1868 02:40:33,720 --> 02:40:39,180 not have a policy in place, however, it is something that is of public interest as of 1869 02:40:39,180 --> 02:40:45,580 late and the village board actually plans to discuss it at their workshop next Monday. 1870 02:40:46,960 --> 02:40:52,100 So, at this time, this development is not specifically required to as the village doesn't 1871 02:40:52,100 --> 02:40:55,080 need or have a policy in place at this time. 1872 02:40:55,780 --> 02:40:56,300 Okay. 1873 02:40:56,480 --> 02:40:56,920 Thank you. 1874 02:41:00,380 --> 02:41:01,020 All right. 1875 02:41:01,140 --> 02:41:07,060 So at this time, I guess I'd like to invite anybody from the attendees who would have 1876 02:41:07,060 --> 02:41:13,420 an interest in speaking to the plan commission to raise your hand and one by one will call 1877 02:41:13,420 --> 02:41:16,400 on you and invite you to speak. 1878 02:41:16,960 --> 02:41:19,980 You'll have a three minute timeline. 1879 02:41:20,420 --> 02:41:21,820 You don't have to take the whole thing. 1880 02:41:21,820 --> 02:41:25,420 You can use any portion of that that you choose. 1881 02:41:26,160 --> 02:41:34,220 And I would ask that you use that your three minutes to offer new news to the plan commission, 1882 02:41:34,320 --> 02:41:38,260 because that's what our role here is to take new input and to assess it. 1883 02:41:38,680 --> 02:41:43,960 If you are agreeing with so that you can augment something that somebody else has said, 1884 02:41:44,780 --> 02:41:46,620 you don't have to repeat everything they've said. 1885 02:41:46,720 --> 02:41:50,360 You could just let us know that you agree with what they've said. 1886 02:41:50,360 --> 02:41:55,080 So anyway, is there anybody in the attendee group that has an interest in speaking to the 1887 02:41:55,080 --> 02:41:56,220 plan commission at this time? 1888 02:41:56,520 --> 02:41:58,040 Please raise your Zoom hand. 1889 02:42:07,220 --> 02:42:15,860 Chairman Locke, I see one hand so far from Kelly Mildren, and I am going to allow her 1890 02:42:15,860 --> 02:42:16,360 to speak. 1891 02:42:17,760 --> 02:42:22,300 Kelly, you are now able to speak and you've unmuted yourself, so you can go ahead. 1892 02:42:22,420 --> 02:42:23,260 Please be reminded. 1893 02:42:23,260 --> 02:42:29,460 Did we, we allow for the three minutes and we'll let you know when that's up, if you get close to that point. 1894 02:42:30,960 --> 02:42:37,580 Good evening, Kelly. I'd like you to first introduce yourself. Tell us, we know your name, but tell us your address and then go ahead and speak. 1895 02:42:38,340 --> 02:42:45,840 Good morning or good evening everybody. My name is Kelly Mildren new resident to Glen Ellen at 313 Hill Avenue. 1896 02:42:46,560 --> 02:42:51,600 I just wanted to echo my support of this new development. 1897 02:42:51,860 --> 02:42:53,200 She needs to be sworn in. 1898 02:42:54,540 --> 02:42:55,900 She needs to be sworn in. 1899 02:42:55,980 --> 02:42:56,660 Yes, you do. 1900 02:42:57,060 --> 02:42:57,880 Sorry about that, Kelly. 1901 02:42:58,900 --> 02:42:59,120 Okay. 1902 02:43:00,000 --> 02:43:02,600 So, Barb, could you please swear her in? 1903 02:43:03,480 --> 02:43:03,880 Yes. 1904 02:43:06,790 --> 02:43:09,150 Would you please state your name and address for the public record, 1905 02:43:09,170 --> 02:43:09,870 or you already did that. 1906 02:43:10,510 --> 02:43:10,690 Sorry. 1907 02:43:11,070 --> 02:43:14,790 Do you swear to tell the truth, the whole truth, and nothing but the truth? 1908 02:43:15,390 --> 02:43:15,970 Yes, I do. 1909 02:43:16,850 --> 02:43:17,430 Thank you. 1910 02:43:17,430 --> 02:43:18,690 Yeah, absolutely. 1911 02:43:19,490 --> 02:43:21,870 And thank you, Tracy, for reminding us of that. 1912 02:43:22,230 --> 02:43:23,370 Okay, go ahead, Kelly. 1913 02:43:24,790 --> 02:43:27,510 Yeah, so I just just, I've been listening to everything tonight. 1914 02:43:27,590 --> 02:43:35,430 I was really interested to see what these development plans were really how they're coming to fruition in the town. 1915 02:43:35,550 --> 02:43:43,430 And I think it's just a real value add for a lot of the things that everybody else has already kind of said. 1916 02:43:43,430 --> 02:43:49,570 but I just am a super strong feeling of this being a really great thing for the community. 1917 02:43:50,090 --> 02:43:55,750 I think it's a big value add for the downtown city center and we'll bring in some maybe commuters 1918 02:43:55,750 --> 02:44:01,810 that are looking to maybe leave the city younger families that are starting and hopefully will 1919 02:44:01,810 --> 02:44:08,550 be home buyers in Glen Ellinat future dates as well. So I just wanted to give a big thumbs up 1920 02:44:08,550 --> 02:44:10,270 that I'm a big supporter of this project. 1921 02:44:10,550 --> 02:44:13,170 All right, thank you very much for speaking. 1922 02:44:14,470 --> 02:44:15,990 All right, is there anybody else that? 1923 02:44:19,440 --> 02:44:22,380 Chairman Locke, I do not see any more hands. 1924 02:44:23,020 --> 02:44:28,300 Okay, given that, then I guess we could have a motion 1925 02:44:28,300 --> 02:44:29,780 to close the public hearing. 1926 02:44:30,720 --> 02:44:31,580 So moved. 1927 02:44:32,260 --> 02:44:33,320 And I need a second. 1928 02:44:35,240 --> 02:44:35,740 Second. 1929 02:44:35,740 --> 02:44:43,940 All right. Barb, we have a motion by Commissioner Heming-Litwin and a second by Commissioner 1930 02:44:43,940 --> 02:44:47,820 Hemmel-Heron. May I have a roll call vote, please, to close the public hearing? 1931 02:44:48,480 --> 02:44:54,300 Yes. Plan Commissioner Hemming-Litwin. Yes. 1932 02:44:54,300 --> 02:44:55,720 Yes. 1933 02:44:55,720 --> 02:44:57,620 Thank you Commissioner Mulherin. 1934 02:44:57,980 --> 02:44:58,340 Yes. 1935 02:45:00,110 --> 02:45:02,130 Chairperson Locke. Yes. 1936 02:45:02,710 --> 02:45:05,330 Planned Commissioner Brown. Yes. 1937 02:45:06,130 --> 02:45:08,830 Planned Commissioner Fanella. Yes. 1938 02:45:09,850 --> 02:45:12,870 Planned Commissioner Rodiman. Yes. 1939 02:45:13,970 --> 02:45:16,350 Planned Commissioner Said. Yes. 1940 02:45:17,190 --> 02:45:20,130 Planned Commissioner Van Druska. Yes. 1941 02:45:23,450 --> 02:45:27,510 The motion to close the public hearing passes. All right. Thank you very much. 1942 02:45:27,990 --> 02:45:31,350 All right, we're into the portion of plan commission deliberations. 1943 02:45:31,610 --> 02:45:34,650 Does anybody want to start us off with their thoughts on this project? 1944 02:45:37,620 --> 02:45:39,380 Mr. Mulherin, you are unmuted. 1945 02:45:40,180 --> 02:45:41,000 Be my guest. 1946 02:45:41,320 --> 02:45:46,200 Well, I, I, you know, I'm always leading off and I, but I'll, I'll, I'll take a shot at it. 1947 02:45:47,340 --> 02:45:49,940 Not always leading up, but I get stuck in it sometimes. 1948 02:45:50,420 --> 02:45:51,780 Yeah, yeah, we all do. 1949 02:45:52,120 --> 02:45:52,380 Yeah. 1950 02:45:52,760 --> 02:45:53,200 Okay. 1951 02:45:54,360 --> 02:45:56,720 Very much in favor of this project. 1952 02:45:56,720 --> 02:46:01,860 And I was just looking at the exceptions. 1953 02:46:02,580 --> 02:46:08,680 I suppose the largest one to address, two is heightened parking. 1954 02:46:09,360 --> 02:46:15,600 I think parking is extremely adequate, as we've seen in, you know, the petitioner didn't 1955 02:46:15,600 --> 02:46:21,320 discuss it, but auto ownership is actually declining on a per capita basis in this country. 1956 02:46:21,320 --> 02:46:31,040 And I think we're moving, we're moving to more time-sharing arrangements and it didn't mention it, but, but we have a enterprise 1957 02:46:31,040 --> 02:46:37,080 standardized in town that you can lease, lease a car by the hour or whatever if you want. 1958 02:46:37,900 --> 02:46:41,820 The height, I think, I have no difficulty with this. 1959 02:46:41,920 --> 02:46:46,020 I think it's an outstanding project and I kind of agree. 1960 02:46:46,260 --> 02:46:51,060 I think the, actually, while it might be made slight variance 1961 02:46:51,060 --> 02:46:53,740 for it, I don't think the spirit of the height, 1962 02:46:53,840 --> 02:46:57,660 the height condition is met. 1963 02:46:58,140 --> 02:47:03,200 In terms of the other things, the corner side yard setback, 1964 02:47:03,380 --> 02:47:04,540 I have no difficulty with that. 1965 02:47:04,540 --> 02:47:13,560 the front yard setback, not having a setback from the higher up, the emergency generator 1966 02:47:13,560 --> 02:47:19,960 equipment and the lot coverage ratio I'm absolutely fine with. I don't think that. 1967 02:47:20,080 --> 02:47:30,860 I think this adds a great deal to this site, which has been clear, has been a very challenging 1968 02:47:30,860 --> 02:47:34,100 And this is going to be a good result. 1969 02:47:34,280 --> 02:47:37,780 And I think it will really stimulate some other good things in the community. 1970 02:47:38,420 --> 02:47:39,620 All right. Thank you, John. 1971 02:47:40,080 --> 02:47:41,300 Chairman Locke. 1972 02:47:41,420 --> 02:47:41,500 Yeah. 1973 02:47:41,800 --> 02:47:43,680 I think there might be some other feedback. 1974 02:47:44,080 --> 02:47:48,920 The staff was looking for related to some of the appearance. 1975 02:47:49,920 --> 02:47:50,400 Elements. 1976 02:47:50,860 --> 02:47:52,900 Katie or Kelly, can you pop in and. 1977 02:47:55,410 --> 02:47:56,370 Refresh their memory. 1978 02:47:56,870 --> 02:47:57,350 Yes. 1979 02:47:57,930 --> 02:47:59,570 So I know it was. 1980 02:47:59,570 --> 02:48:08,150 I believe at the very tail end of your lengthy meeting packet, but there was a memo that 1981 02:48:08,150 --> 02:48:15,550 we had sent the petitioner following their receiving comments from the Glen Island Historic 1982 02:48:15,550 --> 02:48:21,530 Preservation Commission and the Glen Island Historical Society where we when we solicited 1983 02:48:21,530 --> 02:48:25,650 some feedback from the historic preservation community and there were some suggestions 1984 02:48:25,650 --> 02:48:32,410 that they had provided that I think the petitioner was they alluded to some of 1985 02:48:32,410 --> 02:48:36,830 it being added but I think they wanted to get the public's feedback and the 1986 02:48:36,830 --> 02:48:41,510 Plank mission's feedback and there's a condition of approval suggested 1987 02:48:41,510 --> 02:48:47,310 condition of approval that also speaks to that. So are there anything in 1988 02:48:47,310 --> 02:48:51,830 particular or just because I remember going through that list and there were 1989 02:48:51,830 --> 02:48:54,650 a lot of things and some of it was spoke to tonight but is there 1990 02:48:54,650 --> 02:48:58,190 or something that, is this an all or nothing 1991 02:48:58,190 --> 02:48:59,310 or specific pieces? 1992 02:49:00,050 --> 02:49:06,410 So we, as staff, we had thought that any increasing 1993 02:49:06,410 --> 02:49:08,450 parapet wall heights, for example, 1994 02:49:09,630 --> 02:49:14,070 any further investigation into enhancing the lighting 1995 02:49:14,630 --> 02:49:17,070 that's being installed, particularly along Creston. 1996 02:49:19,850 --> 02:49:23,030 They did mention the iron work 1997 02:49:23,030 --> 02:49:32,550 and the a possible public art piece. So I think they wanted to know if you weren't 1998 02:49:32,550 --> 02:49:39,630 concurring with that or if there was anything additional. Okay. Okay, 1999 02:49:43,650 --> 02:49:44,330 and that's 2000 02:49:44,330 --> 02:49:47,730 good. And the staff report, if anybody has that in front of them and it's a 2001 02:49:47,730 --> 02:49:50,250 little easier to read than the historical preservation letter at the 2002 02:49:50,250 --> 02:49:55,030 very end of the packet, but then that you're really talking to about item 2003 02:49:55,030 --> 02:49:58,790 number 12, which is the petition incorporating some additional design 2004 02:49:58,790 --> 02:50:02,210 details as recommended by the Historical Preservation Committee. That's what 2005 02:50:02,210 --> 02:50:06,710 you're talking about. Okay. Okay. Chairperson Locke, there were just a couple of 2006 02:50:06,710 --> 02:50:10,430 other things I wanted to note specifically that were talked about, 2007 02:50:10,550 --> 02:50:13,990 possibly integrating some more detail on the corners of the buildings, 2008 02:50:14,590 --> 02:50:17,730 possibly varying the heights of the cornices a little bit. One of the 2009 02:50:17,730 --> 02:50:21,330 comments that came up over and over again was breaking up the roof line because 2010 02:50:21,330 --> 02:50:25,770 they were saying it looked a bit flat. So they were recommending that maybe some 2011 02:50:25,770 --> 02:50:29,750 of the parapets be further deviated so that there was a little 2012 02:50:29,750 --> 02:50:34,070 bit of variation in the roof line. And then finally maybe a little bit more 2013 02:50:34,070 --> 02:50:39,090 of an intricate detail on the cornice is kind of a further final item that 2014 02:50:39,090 --> 02:50:42,670 staff thought out of all the comments from the HBC might might be 2015 02:50:42,670 --> 02:50:48,370 interesting to take a look at. Okay, now is that in any of our documentation that's 2016 02:50:48,370 --> 02:50:55,670 not in the letter? It's it's something that's easy for us to refer to. I'm just 2017 02:50:56,590 --> 02:51:01,010 I think it's just in the letter. Okay, okay, that's okay. I just wanted to know if 2018 02:51:01,010 --> 02:51:03,590 it was at elsewhere because sometimes they are they're summarized elsewhere. I 2019 02:51:03,590 --> 02:51:09,110 know Dave got all of that. I'm still writing it down. So we're gonna ask Dave 2020 02:51:09,110 --> 02:51:16,470 Dave to speak because he's going to have all that. So, I don't know if he wants to go next. Would you be willing to do so, David. 2021 02:51:22,760 --> 02:51:24,920 I can go next. Okay, thank you. 2022 02:51:25,320 --> 02:51:27,880 So speak directly to what were you asking. 2023 02:51:29,100 --> 02:51:32,440 I'm trying to follow. I mean, it was some of the recommendations. 2024 02:51:33,680 --> 02:51:39,900 It was just more of the, how did you feel about the recommendations from historical preservation 2025 02:51:39,900 --> 02:51:42,720 and any of the exterior appearance recommendations, too? 2026 02:51:43,520 --> 02:51:44,700 Can I help? 2027 02:51:44,940 --> 02:51:51,800 Maybe I can help and I can read the specific, like, five things they wanted us to address. 2028 02:51:52,020 --> 02:51:53,120 I have it right in front of me. 2029 02:51:53,440 --> 02:51:53,740 Okay. 2030 02:51:54,040 --> 02:51:59,580 And this is nice because, and Katie just put it up because it's very hard to read 2031 02:51:59,580 --> 02:52:02,580 if you're reading the package on your PC, at least for me it was. 2032 02:52:04,220 --> 02:52:10,580 So it's additional, some of the additional things to possibly include and to address, 2033 02:52:10,860 --> 02:52:16,580 adding detail to the building corners, varying the roof line by increasing the cornice heights, 2034 02:52:17,460 --> 02:52:24,160 incorporate public art and historical light fixtures. Okay. Those are the 2035 02:52:25,720 --> 02:52:29,120 five, five things, right? 2036 02:52:29,800 --> 02:52:37,100 Building corners, veering roofline, four things, incorporating public art and historic fixtures, 2037 02:52:37,540 --> 02:52:38,100 light fixtures. 2038 02:52:38,840 --> 02:52:39,260 Okay. 2039 02:52:41,810 --> 02:52:46,670 I mean, I can speak to, you know, the corner has. 2040 02:52:48,210 --> 02:52:48,490 Go ahead. 2041 02:52:49,780 --> 02:52:54,150 I just think we need to, we need to make sure we all talk about that and come to 2042 02:52:55,310 --> 02:53:02,030 of some kind of a consensus for if we're going to approve this to be part of a condition, 2043 02:53:02,330 --> 02:53:02,530 right? 2044 02:53:03,070 --> 02:53:03,310 Right. 2045 02:53:03,550 --> 02:53:04,350 That's what I believe. 2046 02:53:04,550 --> 02:53:05,410 And that's why I kind of- 2047 02:53:05,410 --> 02:53:05,610 Okay. 2048 02:53:06,150 --> 02:53:06,350 Yeah. 2049 02:53:06,950 --> 02:53:08,030 I mean, let David go. 2050 02:53:08,210 --> 02:53:09,910 I sense he's given it some thought. 2051 02:53:10,450 --> 02:53:10,930 Go ahead. 2052 02:53:10,930 --> 02:53:12,130 I mean, that's fine. 2053 02:53:12,410 --> 02:53:20,090 You know, I don't, I think some of the ideas are somewhat addressed in, you know, 2054 02:53:20,090 --> 02:53:30,090 the petitioner's presentation, some of the last slides of attempting to, you know, add 2055 02:53:30,090 --> 02:53:37,410 some of this detail, I think architecturally, you know, varying the roof line traditionally 2056 02:53:37,410 --> 02:53:42,870 would help break up a big volume like this. I don't think we're going to vary that roof 2057 02:53:42,870 --> 02:53:49,530 line that much to really make that much significant impact. I don't think you'll 2058 02:53:49,530 --> 02:53:58,670 necessarily see it a whole lot unless I just think it's a good idea so maybe we 2059 02:53:58,670 --> 02:54:03,330 say go ahead let's study it a little bit I think maybe to vary the profile of the 2060 02:54:03,330 --> 02:54:08,850 cornice along with varying the roofline height might actually have an impact 2061 02:54:08,850 --> 02:54:13,790 you'd start to see something that looks different on one day than on the other so 2062 02:54:13,790 --> 02:54:21,030 I would be in favor of that. As far as adding additional detail or opportunities for public 2063 02:54:21,030 --> 02:54:27,650 art, you know, I think the idea that we don't want blank walls, we're trying to animate 2064 02:54:27,650 --> 02:54:35,890 the street. I too, much like one of the public's comments, you know, that long wall 2065 02:54:35,890 --> 02:54:42,090 along the street, that that's very challenging. But I think the steps that the petitioner 2066 02:54:42,090 --> 02:54:50,130 has taken, obviously, from the previous presentation to now, I think it's quite a bit improved. 2067 02:54:51,670 --> 02:54:59,510 And I think the direction it's moving is in the right direction, so I can continue with 2068 02:54:59,510 --> 02:55:00,250 my other comments. 2069 02:55:00,650 --> 02:55:01,390 Yeah, go ahead. 2070 02:55:01,730 --> 02:55:02,230 Yes, please. 2071 02:55:02,590 --> 02:55:02,730 Okay. 2072 02:55:03,390 --> 02:55:10,690 You know, I do think, you know, I came into this tonight, still, I still feel that 2073 02:55:10,690 --> 02:55:18,490 the building's too big for the site. We limit our bulk in town by a couple things, by lot coverage 2074 02:55:18,490 --> 02:55:25,830 and building height. We don't use what they call FAR. We, you know, we, we have ways to limit buildings 2075 02:55:25,830 --> 02:55:32,610 as far as how they, you know, get fit in onto a site. And this building is certainly 2076 02:55:32,610 --> 02:55:38,410 a massive building for that size site. 2077 02:55:38,790 --> 02:55:42,050 However, you know, through the presentation 2078 02:55:42,050 --> 02:55:43,530 and the steps that this, 2079 02:55:43,710 --> 02:55:47,710 the petitioner and the architect here at, 2080 02:55:47,930 --> 02:55:49,090 they've made some nice, 2081 02:55:50,250 --> 02:55:52,750 they, I think they've improved what they had before 2082 02:55:53,330 --> 02:55:53,810 tremendously. 2083 02:55:54,290 --> 02:55:58,010 I think the setback and having the one story 2084 02:55:58,010 --> 02:55:59,910 project out along Crescent 2085 02:55:59,910 --> 02:56:01,490 and then pulling the building back 2086 02:56:01,490 --> 02:56:05,650 will really reduce the wall effect along Crescent. 2087 02:56:06,010 --> 02:56:09,290 I'm much less concerned about a pedestrian, 2088 02:56:10,290 --> 02:56:14,450 about the feel and the fact that I have terraces of bald. 2089 02:56:16,530 --> 02:56:19,290 I think the way that they've handled it 2090 02:56:19,290 --> 02:56:22,670 and still get this many units in this much parking, 2091 02:56:23,950 --> 02:56:27,270 I think they've done probably the best they can 2092 02:56:27,270 --> 02:56:29,250 with the conditions they have. 2093 02:56:29,250 --> 02:56:39,310 and I know it's an economic formula that comes up to make a project make sense or not make sense. 2094 02:56:39,670 --> 02:56:48,290 I mean, I do feel that coming up, we're still coming up short of retail space for what I would 2095 02:56:48,290 --> 02:56:54,770 prefer to see, but I don't want retail that's down on a tail end that's going to die either. 2096 02:56:54,770 --> 02:57:03,830 So, you know, I kind of worry, I think where they placed it and how they've animated the street and what they've done on the second floor. 2097 02:57:04,970 --> 02:57:09,670 I think it's all in the right direction. So I applaud them for that. 2098 02:57:10,370 --> 02:57:15,410 I'm not, and I'm still uneasy about the ball. 2099 02:57:19,440 --> 02:57:21,100 Okay, my comments. 2100 02:57:21,660 --> 02:57:22,040 Okay. 2101 02:57:23,980 --> 02:57:27,280 Anybody else from the Planned Commission like to make a comment at this point? 2102 02:57:28,660 --> 02:57:33,420 And again, I cannot, I can only see half the group here with my view because of the. 2103 02:57:34,140 --> 02:57:34,820 Mary, I think. 2104 02:57:35,940 --> 02:57:36,860 Okay, go ahead. 2105 02:57:40,420 --> 02:57:44,660 I actually really like the way this project turned out as the iteration has gone from 2106 02:57:44,660 --> 02:57:47,600 the pre-op to the current one that we've seen today. 2107 02:57:47,600 --> 02:57:55,580 I think the petitioner for taking our opinions and our ideas into account and I think that 2108 02:57:55,580 --> 02:58:01,160 anything that you can't incorporate from the historic point of view and those little details 2109 02:58:01,160 --> 02:58:05,420 that make it a little more like Glen Allen and a little less cookie cutter would be appreciated 2110 02:58:05,420 --> 02:58:10,120 but I don't want to dictate anything to the architecture of the building. 2111 02:58:10,900 --> 02:58:12,200 That makes sense. 2112 02:58:13,760 --> 02:58:20,900 I think this building has a city feel I really like with the big second floor balconies overlooking the street, the way it's lit up. 2113 02:58:22,040 --> 02:58:28,900 And the drop off area was a great idea and just want to make sure that we do have that requirement to post the 15 minute signs. 2114 02:58:30,800 --> 02:58:38,080 And I think this moves us closer to our goal of 450 new residential units to downtown. 2115 02:58:38,700 --> 02:58:42,760 And we've approved the project by the library main street project. 2116 02:58:42,960 --> 02:58:49,820 And this just gets us a little bit closer by my math where this will get us to 241 of that 450 units. 2117 02:58:50,140 --> 02:58:51,820 So we're moving towards that goal. 2118 02:58:53,200 --> 02:59:02,480 I'm comfortable with all of the conditions for the plan, and I think I touched on everything 2119 02:59:02,480 --> 02:59:05,860 that the staff has asked us to talk about, so if I missed anything, let me know. 2120 02:59:06,900 --> 02:59:07,360 Okay. 2121 02:59:07,560 --> 02:59:08,380 Thank you very much. 2122 02:59:10,120 --> 02:59:12,820 Who else would like to offer your thoughts? 2123 02:59:13,320 --> 02:59:13,600 Hey, Jamie. 2124 02:59:14,180 --> 02:59:14,800 I'll chime in. 2125 02:59:15,200 --> 02:59:15,460 Please. 2126 02:59:16,860 --> 02:59:19,100 You know, these projects are so hard, right? 2127 02:59:19,100 --> 02:59:24,520 you know this is a big project it's in an interesting location I think versus 2128 02:59:24,520 --> 02:59:30,520 say the Main Street project where it's in a location where that property sat for 2129 02:59:30,520 --> 02:59:36,220 a long period of time it is really long it is a narrow piece of property so it's 2130 02:59:36,220 --> 02:59:42,980 a little awkward I think the fact that it sits a little lower is extremely 2131 02:59:42,980 --> 02:59:46,260 helpful in the overall we're considering the height of the building 2132 02:59:46,260 --> 02:59:52,940 right? I mean, if we can build a 60 feet and the elevator tops are at seven feet higher than that, 2133 02:59:53,420 --> 02:59:59,940 I don't really have a problem with that part of it. I walked around that area earlier than the 2134 03:00:01,820 --> 03:00:09,440 I think, you know, you get torn right between trying to do what's right for the village, trying 2135 03:00:09,440 --> 03:00:16,700 to also advance, you know, hopefully trying to do something good for the village financially 2136 03:00:17,620 --> 03:00:24,240 and then help grow the village, you know, historically. We've talked about, you know, the style of 2137 03:00:24,240 --> 03:00:29,140 this town and the charm of this town and I don't, it would hate to see anything happen 2138 03:00:29,140 --> 03:00:35,640 to that at the same time I think you know there is a patch quilt of different styles in this town 2139 03:00:36,320 --> 03:00:41,920 when you look at the architecture over time right it's not like Galena where everything 2140 03:00:41,920 --> 03:00:50,300 happened in a 10-year period so I think you know overall I like the project I'm okay with the 2141 03:00:50,300 --> 03:00:55,280 height I think some of the things a petitioner brought up tonight I appreciate or do appreciate 2142 03:00:55,280 --> 03:01:02,420 the amount of detail and time they took all you guys to try and accommodate all 2143 03:01:02,420 --> 03:01:08,560 the input and some of the character of the town and some of the architectural 2144 03:01:08,560 --> 03:01:15,040 elements let's call them I guess. And overall I'm in support of the project. I 2145 03:01:15,040 --> 03:01:19,460 am not totally sure how we go about incorporating some of the things they 2146 03:01:19,460 --> 03:01:26,700 put in their presentation into this but overall you know I'm okay with the 2147 03:01:26,700 --> 03:01:31,840 project I think they put a lot of time and effort into trying to accommodate 2148 03:01:31,840 --> 03:01:37,540 and seek input from various groups into this project I think the retail end of 2149 03:01:37,540 --> 03:01:41,780 it is tough looking at my notes you know part of the problem with Main Street 2150 03:01:41,780 --> 03:01:45,360 is you had retail and parking on the first floor right and you had to move 2151 03:01:45,360 --> 03:01:48,920 all the residential parking to the second floor once you've done that you 2152 03:01:48,920 --> 03:01:56,840 have any residential, your first floor, first floor of full units is a third floor. So in this case 2153 03:01:56,840 --> 03:02:02,100 you've got a lower parking level and you have a mid-level parking, and I think trying to accommodate 2154 03:02:02,100 --> 03:02:08,260 more retail, which would be ideal, but it would be really hard to do without giving up parking 2155 03:02:08,260 --> 03:02:12,380 and then having to find a place to put that, which seems crazy when you have a building that 2156 03:02:12,380 --> 03:02:18,200 long, but it it's just kind of just, I guess, how I logically was trying to break it down 2157 03:02:18,200 --> 03:02:24,720 when I was looking at it and I agree like David said if there's anything we can do that crescent 2158 03:02:24,720 --> 03:02:31,060 side is obviously the longest part of that building it is going to be the most obvious part that needs 2159 03:02:31,060 --> 03:02:36,180 probably the most breaking up because this is the most visible so anything we can do to soften 2160 03:02:36,180 --> 03:02:40,560 that you know would be great and if there's architectural elements or historical elements 2161 03:02:41,180 --> 03:02:46,400 that can be incorporated into that I think it'd be great but yeah okay that's about the extent 2162 03:02:46,400 --> 03:02:50,680 of my notes. All right, Jamie, thank you very much. All right, Tracy, go ahead. 2163 03:02:53,540 --> 03:03:01,840 I really appreciate that the developer did take a lot of what we talked about back in May, 2164 03:03:02,520 --> 03:03:09,320 and I like Angela in looking at, we for years have been saying we need these types of units 2165 03:03:09,960 --> 03:03:16,780 within Glen Allen you know whether it be empty nesters or younger people places 2166 03:03:16,780 --> 03:03:22,080 for them to be part of the village and you know the site has set vacant for so 2167 03:03:22,080 --> 03:03:29,520 long that you know it's it's there's taxes being paid but there could be a 2168 03:03:29,520 --> 03:03:37,800 lot more taxes being paid by developing the site and you know again I 2169 03:03:37,800 --> 03:03:44,160 We know somebody recommended that they dig two stories down to put in parking at a second 2170 03:03:44,160 --> 03:03:49,820 level, you know, both of them below grade, which we've had numerous discussions in the 2171 03:03:49,820 --> 03:03:56,660 past on other developments that that's just not something people want to do is to drive 2172 03:03:56,660 --> 03:03:58,900 two grades down if they're living in a building. 2173 03:03:59,780 --> 03:04:03,360 And so the retail piece of it is, is limited. 2174 03:04:03,360 --> 03:04:03,500 it. 2175 03:04:03,660 --> 03:04:09,220 I think they could put something in there that's sorely missing in Gledon. 2176 03:04:09,700 --> 03:04:14,440 I think they mentioned possibly a high-end deli, which I think would be great. 2177 03:04:15,680 --> 03:04:23,500 Maybe some kind of a bakery or something, something that we don't have and can be there 2178 03:04:23,500 --> 03:04:28,760 and move to that, you know, bring people into that area. 2179 03:04:29,760 --> 03:04:43,660 I appreciate the fact that I personally like what they've done with colors and that they've put black windows in and are trying to bring in some of the iron elements on the outside that they already have there. 2180 03:04:44,320 --> 03:04:58,280 I also believe that along Crescent we do need to have something, you know, they did break it up so it's not just the same wall all along they have different areas but it would be nice maybe if they could do something. 2181 03:04:59,280 --> 03:05:01,440 Again, I'm just going to put it out there. 2182 03:05:04,220 --> 03:05:09,560 Murals are fine, but over time, you know, they need upkeep. 2183 03:05:10,140 --> 03:05:16,360 So it's, you know, whatever's being done, I would like it to mean something to Glenn 2184 03:05:16,360 --> 03:05:20,580 Allen but not be something that is initially done and then not kept up. 2185 03:05:21,860 --> 03:05:26,440 You know, maybe it is adding some iron work into that area. 2186 03:05:26,440 --> 03:05:33,100 But the one thing I will say is, because I've walked that path a lot in my lifetime here, 2187 03:05:34,120 --> 03:05:40,580 in Glen Allen, I think by them giving those parking spaces back and making that sidewalk wider 2188 03:05:40,580 --> 03:05:46,360 than it was, is going to be helpful even though there is going to be a solid wall against Crescent. 2189 03:05:46,960 --> 03:05:54,260 Because that was a very narrow sidewalk due to the fact of people having the parking, 2190 03:05:54,260 --> 03:06:01,260 parking, the inlet parking along there. So from that standpoint, I'm okay with the 2191 03:06:01,260 --> 03:06:07,380 lighting. I know I'm a big proponent of not having a ton of lighting around, but I 2192 03:06:07,380 --> 03:06:13,100 think the way the lighting is done and if it's, if there is a way to turn off certain 2193 03:06:13,100 --> 03:06:18,740 types of those lights to make it darker at a certain time of the day, I think it's 2194 03:06:18,740 --> 03:06:22,360 something we should do. But on the other hand, I also think that area needs some 2195 03:06:22,360 --> 03:06:30,760 lighting for safety reasons from that standpoint. So, if I'm going to go look at the four things, 2196 03:06:31,040 --> 03:06:36,380 the Historic Preservation Commission and the Glen Island Historical Society, 2197 03:06:38,900 --> 03:06:48,840 the roofline, again, I think David said maybe having some more, not necessarily height, 2198 03:06:48,840 --> 03:06:56,020 but more detail to it. And Commissioner Rodman, if I'm misspeaking, I would agree with you there. 2199 03:06:59,960 --> 03:07:06,040 And, you know, again, any way we can do some kind of bringing in some history to Glenelon to 2200 03:07:06,040 --> 03:07:10,320 that outside of that building, I think it's fine. I think we have to be careful, though, 2201 03:07:10,400 --> 03:07:14,940 about telling them to go with this saying it has to be a historical light fixture. 2202 03:07:16,080 --> 03:07:25,440 I just don't know if I want to get that specific with them, and that would be what I have to input. 2203 03:07:26,180 --> 03:07:27,900 Okay, thank you very much. 2204 03:07:29,960 --> 03:07:41,180 I am in support of this project because it meets the intent of our comprehensive plan, multi-units with the commercial space. 2205 03:07:41,180 --> 03:07:44,680 But the commercial space is not enough. 2206 03:07:45,500 --> 03:07:50,380 And also the parking for the commercial is my big concern. 2207 03:07:51,220 --> 03:07:56,920 Because they cannot do any parking on the, I think Glenwood Road. 2208 03:07:57,800 --> 03:08:05,140 And it will be difficult for the customers who come to this commercial place. 2209 03:08:06,760 --> 03:08:16,920 Overall, I think this project meets our comprehensive plan requirements and I am in support of that. 2210 03:08:17,100 --> 03:08:31,080 Though it looks very long on the glimmer, on the crescent, but I think the architect and the developer has done a fantastic work. 2211 03:08:31,080 --> 03:08:37,000 work, it looks very beautiful in that area. Though it is alone. I mean, I'm in support. 2212 03:08:38,240 --> 03:08:43,780 All right. Thank you, Mohammed. Okay. Laura, did you want to join in on anything? 2213 03:08:46,540 --> 03:08:47,020 Sure. 2214 03:08:49,680 --> 03:08:57,850 I'm supportive of this project. I think all of the everything that they've 2215 03:08:57,850 --> 03:09:03,170 done since May has really made it a lot more appealing. I like all the changes to the 2216 03:09:03,170 --> 03:09:10,350 more side of the building. I really think the step back on the 2217 03:09:11,150 --> 03:09:19,410 present side is nice. I think that this building achieves a 2218 03:09:19,410 --> 03:09:22,910 goal of keeping retaining current Glen Allen residents, 2219 03:09:23,250 --> 03:09:26,730 homeowners, this gives them an option to maybe downsize, sell 2220 03:09:26,730 --> 03:09:31,910 their home and but still stay in the community. And also 2221 03:09:31,910 --> 03:09:38,950 attract new younger residents that are looking to explore the option of buying in the suburbs 2222 03:09:38,950 --> 03:09:46,490 but want to try out renting first. I love the idea of McChesney deli. I hope the McChesney 2223 03:09:46,490 --> 03:09:53,710 family would grant that request. And overall, I think it's a great addition to the town. 2224 03:09:54,430 --> 03:10:01,410 All right. Thank you very much. I agree and with a lot of the things my fellow commissioners 2225 03:10:01,410 --> 03:10:10,030 said. I like that step back in Crescent. I think that adds a really neat personality to the building. 2226 03:10:10,710 --> 03:10:15,990 I love what Laura just said about the deli. I thought the idea of a McChesney deli was just 2227 03:10:15,990 --> 03:10:20,830 wonderful. And it really, you know, if you used, if you were able to pull that off 2228 03:10:21,410 --> 03:10:26,870 and use some of the old signs from McChesneys, that would be, it would be so fun. I think that'd 2229 03:10:26,870 --> 03:10:33,010 need. I really want to thank the petitioner for just, you know, investing the time and energy 2230 03:10:33,010 --> 03:10:38,130 at this point in Glenelon and your interest in Glenelon. And also, I want to thank you for working 2231 03:10:38,130 --> 03:10:46,170 with the historical preservation group. And please do incorporate their suggestions as much as 2232 03:10:46,170 --> 03:10:55,030 you can. They have, you know, I know that sometimes I don't feel like I am the expert on 2233 03:10:55,030 --> 03:11:00,450 architectural renderings, even though we're to give the exterior appearance review. But there's 2234 03:11:00,450 --> 03:11:05,810 those that I worked with the architecture group and the historical preservation and those folks 2235 03:11:05,810 --> 03:11:09,130 do know what they're talking about. So I really appreciate you continuing to work with them. 2236 03:11:10,110 --> 03:11:16,650 And so I am in support of this project. And thank you very much for your time tonight. 2237 03:11:17,090 --> 03:11:21,590 I think what we need now, based on what I'm hearing from my fellow plan commissioners, 2238 03:11:21,590 --> 03:11:25,170 is a motion to approve this project. 2239 03:11:25,690 --> 03:11:27,430 Mary, can I just add one more comment? 2240 03:11:27,750 --> 03:11:28,250 Yes, please. 2241 03:11:29,290 --> 03:11:30,830 We didn't mention staff, 2242 03:11:31,210 --> 03:11:33,910 because I think the work that staff has done 2243 03:11:33,910 --> 03:11:36,770 on this project is absolutely outstanding. 2244 03:11:37,090 --> 03:11:39,210 And I want to congratulate all of you. 2245 03:11:39,370 --> 03:11:41,930 I think it's, they brought the developer 2246 03:11:41,930 --> 03:11:43,010 along as we've acknowledged. 2247 03:11:43,370 --> 03:11:45,390 And I don't think we wouldn't, 2248 03:11:45,510 --> 03:11:47,930 we wouldn't, you know, they're making, 2249 03:11:48,130 --> 03:11:49,870 they're making this possible, I think. 2250 03:11:49,870 --> 03:11:51,770 So I appreciate it. 2251 03:11:51,810 --> 03:11:55,010 All right, and I will echo Mr. Moharin's comments. 2252 03:11:55,130 --> 03:11:56,710 So thank you very much to all the staff 2253 03:11:57,490 --> 03:11:58,870 for all your hard work in this. 2254 03:12:00,210 --> 03:12:03,830 So that motion, I guess I have a question 2255 03:12:03,830 --> 03:12:06,330 because we have a draft motion and support. 2256 03:12:06,910 --> 03:12:09,130 And then we also have the findings of FACT, 2257 03:12:09,250 --> 03:12:10,910 which is a five-page document. 2258 03:12:11,530 --> 03:12:15,090 Can we somehow summarize this five-page document 2259 03:12:15,090 --> 03:12:18,890 or do you really need us to go through this? 2260 03:12:19,510 --> 03:12:21,670 I don't think we need to read it, correct? 2261 03:12:22,290 --> 03:12:22,850 That's correct. 2262 03:12:23,050 --> 03:12:27,590 So the way that we've set this up, we're going to be attaching the findings to the minutes so they're available. 2263 03:12:28,890 --> 03:12:33,630 We don't need to be read into the record, but just the motion itself needs to be read into the record. 2264 03:12:33,730 --> 03:12:35,370 That does include the conditions though, Tracy. 2265 03:12:35,950 --> 03:12:36,270 Okay. 2266 03:12:36,870 --> 03:12:37,050 Okay. 2267 03:12:37,490 --> 03:12:38,270 I think he's got it. 2268 03:12:38,510 --> 03:12:47,770 The only thing, the only thing we, I need to clarify is as part of the motion, 2269 03:12:47,770 --> 03:12:52,270 It talks about the Historic Preservation Commission in Glendale and Historical Society 2270 03:12:53,490 --> 03:13:05,650 and about the memo addressed on October 12th, which do we want to say they need to incorporate 2271 03:13:05,650 --> 03:13:11,970 some things, including detail to the building corners, varying of the roof line, incorporating 2272 03:13:11,970 --> 03:13:20,010 public art and historic light fixtures prior to the village board review. Do we want to make that 2273 03:13:20,010 --> 03:13:33,490 a condition of our vote tonight or do we want to remove that since there are already I am assuming 2274 03:13:33,490 --> 03:13:41,690 and correct me if I'm wrong, Katie and Kelly, that when this goes in front of the Village 2275 03:13:41,690 --> 03:13:47,830 Board, that information from the Historic Preservation and the Historical Society will 2276 03:13:48,920 --> 03:13:55,670 be part of that package and the Board can address if they don't believe that they've 2277 03:13:55,670 --> 03:13:58,210 taken enough of that into account. 2278 03:14:00,840 --> 03:14:02,200 Did that make any sense? 2279 03:14:02,200 --> 03:14:06,860 Yeah, but let me start with the first part of your question, which is do we want to 2280 03:14:07,380 --> 03:14:14,020 Leave the draft the motion as it's written with number 12 in it or you're saying should we potentially take it out? 2281 03:14:14,440 --> 03:14:20,960 I'm personally fine. We're adjusted. Yeah, I'm fine with it in there personally. So let's see what the other commissioners ask 2282 03:14:20,960 --> 03:14:22,320 because you asked that that was 2283 03:14:24,140 --> 03:14:29,880 What is everybody have it or do I need to read that read well, please okay 2284 03:14:30,980 --> 03:14:37,680 that the petitioner incorporates some additional design detail into the building as recommended 2285 03:14:37,680 --> 03:14:43,800 by the Historic Preservation Commission and the Glen Ellen Historical Society per the memo 2286 03:14:43,800 --> 03:14:50,680 addressed to the petitioner dated October 21, 2020, which might include adding details 2287 03:14:50,680 --> 03:14:57,140 to the building corners, varying the roofline by increasing the cornice heights, incorporating 2288 03:14:57,140 --> 03:14:59,280 public art and historic light fixtures. 2289 03:15:00,000 --> 03:15:04,360 Any such changes shall be incorporated prior to village board of the project. 2290 03:15:06,950 --> 03:15:08,190 So this would mean they 2291 03:15:08,190 --> 03:15:16,010 would have to change their designs to include these prior to submitting, prior to going in front of the 2292 03:15:16,010 --> 03:15:24,110 village board with the way it's written. But it says might include. Right. I think we left it just a 2293 03:15:24,110 --> 03:15:28,190 little bit open-ended so that they wouldn't have to include all those things, but if you all wanted 2294 03:15:28,190 --> 03:15:32,230 to suggest one or two that those things could be incorporated prior to the 2295 03:15:32,230 --> 03:15:36,510 Village Board reviewing and taking a look at the project. And again, I find with 2296 03:15:36,510 --> 03:15:43,550 the soft wording for so that they can choose what works best for them but. So 2297 03:15:43,550 --> 03:15:52,010 should we put that if the petitioner chooses to incorporate more? Maybe we 2298 03:15:52,010 --> 03:15:56,290 say something like they work with staff to incorporate as many as 2299 03:15:56,290 --> 03:16:00,330 possible prior to the village board meeting. 2300 03:16:01,130 --> 03:16:02,550 No, I'm fine with that. 2301 03:16:03,070 --> 03:16:04,270 Certainly we have some recommendations. 2302 03:16:05,510 --> 03:16:07,750 Otherwise number 12 wouldn't be there. 2303 03:16:08,490 --> 03:16:09,490 Yes, Katie. Right. 2304 03:16:10,870 --> 03:16:12,730 I was just, 2305 03:16:14,050 --> 03:16:17,190 if there were any elements that the petitioner share during their 2306 03:16:17,190 --> 03:16:20,670 presentation specifically that maybe weren't included in the packet. 2307 03:16:20,670 --> 03:16:29,990 that the planning commissioners preferred and maybe you could specifically call those out even like the detailing on the columns, for example. 2308 03:16:31,420 --> 03:16:37,490 And the art metal work there if there are any features that they were suggesting. 2309 03:16:39,190 --> 03:16:44,130 We could also look at it in the alternative, we could say if there was anything they proposed 2310 03:16:44,130 --> 03:16:48,970 that you didn't like, let us know and then we'll make sure those aren't included. 2311 03:16:50,510 --> 03:16:53,690 On the other hand, there were so many things I don't know that I wanted. 2312 03:16:53,970 --> 03:16:55,030 I don't want to list them. 2313 03:16:55,410 --> 03:17:00,730 I like your idea of let's work with staff to incorporate, you know, to improve the 2314 03:17:00,730 --> 03:17:00,910 building. 2315 03:17:01,970 --> 03:17:02,130 Yeah. 2316 03:17:04,310 --> 03:17:05,110 You're okay with that? 2317 03:17:05,110 --> 03:17:05,530 I'll change it. 2318 03:17:05,790 --> 03:17:06,690 Yes, I'm okay with that. 2319 03:17:06,690 --> 03:17:13,270 Okay, thank you. I'll change it to say that the petitioner work with staff to incorporate some additional design details. 2320 03:17:15,110 --> 03:17:24,810 Into the building is recommended by the historical preservation. Yeah, right. Yeah, and then continue on. So I'm just adding that. Okay. Okay. Okay, you guys. This is long. 2321 03:17:27,210 --> 03:17:29,990 I'll do my best to get through this quickly as possible. 2322 03:17:30,850 --> 03:17:35,810 After conducting a public hearing and deliberating on the requests of the Petitioner, Michael 2323 03:17:35,810 --> 03:17:40,870 O'Connor, Vice President of Development and Leasing of how holiday properties for approval 2324 03:17:40,870 --> 03:17:47,950 of a special use for preliminary and final planned unit development with zoning deviations, 2325 03:17:48,330 --> 03:17:55,550 a special use to allow multifamily dwellings and exterior appearance, allow to all, sorry, 2326 03:17:55,550 --> 03:18:12,830 All to allow the construction of a five-story mixed-use building with ground floor commercial space, apartments, and an enclosed parking garage on the property located at 460 Crescent Boulevard in the C5B central service district, or sub-district. 2327 03:18:12,830 --> 03:18:18,790 The Plan Commission hereby recommends approval based on the findings of FACT as discussed 2328 03:18:20,370 --> 03:18:26,450 at the Plan Commission public hearing on November 12, 2020, and a copy of which will be attached 2329 03:18:26,450 --> 03:18:31,630 to the minutes of the meeting and kept unfit as part of the permanent record of the village. 2330 03:18:32,730 --> 03:18:36,510 The Plan Commission makes the recommendation of approval with the following conditions. 2331 03:18:36,970 --> 03:18:42,450 Number one, that the petitioner construct, maintain and operate the development in substantial 2332 03:18:42,450 --> 03:18:49,210 conformance with the plans and testimony presented at the plant commission public hearing and before the village Board of Trustees. 2333 03:18:49,910 --> 03:18:57,410 Number two, that the petitioner shall install, maintain, and replace all landscape material per the approved landscape plan. 2334 03:18:57,950 --> 03:19:08,890 Number three, that the petitioner prepare a construction management plan for review at a pre-construction meeting with the police, fire, public works, and community development departments. 2335 03:19:08,890 --> 03:19:16,350 And that sets village staff approve the construction management plan before the issuance of building permits. 2336 03:19:17,350 --> 03:19:31,570 Number 4, that a proposed drop off slash pick up recess curve area at the northwest corner of Crescent and Glomode intersection should remain in the and incorporate and be incorporated into the village board approved. 2337 03:19:32,010 --> 03:19:37,010 Downtown streets gave improvement plan be signed with a time limit of 15 minutes. 2338 03:19:37,010 --> 03:19:52,770 Number five, that the petitioner shall comply with the downtown streetscape improvement plan adapted by the village board for the Glenwood Avenue and Crescent Boulevard right-of-ways and coordinate with public works on the installation of the materials. 2339 03:19:53,270 --> 03:20:01,390 Number six, that any outdoor cafe seating obtain a license agreement with a village annually before seating is installed and used. 2340 03:20:01,390 --> 03:20:11,590 Number seven, that the petitioner coordinate with public works to install a new bike rack consistent with downtown streetscape furniture in an appropriate location. 2341 03:20:11,590 --> 03:20:21,490 Number eight, that sheets A-101 and A-102, prepared by tandem architecture Inc. 2342 03:20:21,690 --> 03:20:30,190 dated 11-5-2020, which propose a total of 104 parking stalls, be modified as 2343 03:20:30,190 --> 03:20:38,730 required by the 218 Illinois accessibility code and section 10-5-13-I of the 2344 03:20:38,730 --> 03:20:44,570 zoning code to provide that no less than 102 parking styles prior to building permit 2345 03:20:44,570 --> 03:20:45,230 issuance. 2346 03:20:45,950 --> 03:20:53,490 Number nine, that all visible rooftop mechanical units be screened with the height not to exceed 2347 03:20:53,490 --> 03:20:56,030 that of overall maximum height deviated granted. 2348 03:20:57,110 --> 03:21:03,050 Number 10, that all proposed improvements to the public right-of-way be subject to 2349 03:21:03,050 --> 03:21:08,130 change per the pending downtown central business district streetscape improvement per 2350 03:21:08,130 --> 03:21:09,070 for village board approval. 2351 03:21:09,850 --> 03:21:13,250 Number 11, that the petitioner secure all required 2352 03:21:13,250 --> 03:21:18,090 temporary construction and perpetual easement 2353 03:21:18,090 --> 03:21:20,390 on private property before the issuance 2354 03:21:20,390 --> 03:21:21,510 of any building permits. 2355 03:21:22,190 --> 03:21:25,170 Number 12, that the petitioner work with staff 2356 03:21:25,170 --> 03:21:28,030 to incorporate some additional design detail 2357 03:21:28,590 --> 03:21:30,050 into the building as recommended 2358 03:21:30,050 --> 03:21:31,750 by the Historic Preservation Commission 2359 03:21:31,750 --> 03:21:33,690 and the Glen Island Historical Society. 2360 03:21:34,150 --> 03:21:36,070 Prove the memo address to the petitioner 2361 03:21:36,070 --> 03:21:43,150 dated October 21, 2020, which might include adding details to the building corners varying 2362 03:21:43,150 --> 03:21:47,790 the roof lines by increasing the corner sites, incorporating public art and historic light 2363 03:21:47,790 --> 03:21:52,890 fixtures. Any such changes should be incorporated prior to the Village Board review of the 2364 03:21:52,890 --> 03:21:53,270 project. 2365 03:21:53,950 --> 03:22:03,310 Number 13, that the petitioner pay a total of $171,205.64 in developer donations for 2366 03:22:03,310 --> 03:22:08,690 dispersal to the Glen Elm Park District, School District 41, School District 87, 2367 03:22:08,890 --> 03:22:13,470 the Glen Elm Library, and the Glen Elm Bound to Fire Company before the issuance of any 2368 03:22:13,470 --> 03:22:20,130 construction building permits. And number 14, that all floor plans, elevations, and other 2369 03:22:20,130 --> 03:22:24,550 architectural plans be consistent with one another to the satisfaction of the building 2370 03:22:24,550 --> 03:22:28,150 and zoning official prior to the issuance of any building permits. 2371 03:22:28,950 --> 03:22:31,890 I have a motion. May I have a second please? 2372 03:22:31,890 --> 03:22:40,690 I do okay Mohammed okay Barbara may we have a roll call vote we have a motion 2373 03:22:40,690 --> 03:22:46,710 by Commissioner Heming-Litwin and we have a second by Commissioner Said all 2374 03:22:46,710 --> 03:22:58,240 right plan Commissioner Heming-Litwin yes plan Commissioner Said yes chair 2375 03:23:00,290 --> 03:23:01,870 person lock. Yes. 2376 03:23:04,090 --> 03:23:10,530 Plan commissioner Brown. Yes. Plan commissioner Fanela. Yes. 2377 03:23:12,760 --> 03:23:13,100 Plan 2378 03:23:13,100 --> 03:23:20,300 commissioner Moheras. Yes. Plan commissioner Rademann. No. 2379 03:23:22,660 --> 03:23:23,440 Plan commissioner 2380 03:23:23,440 --> 03:23:25,320 Vandrista. Yes. 2381 03:23:28,820 --> 03:23:33,940 The motion passes. Okay. Thank you very much Barb. And thank you 2382 03:23:33,940 --> 03:23:42,500 to our petitioner. We wish you well and thank you staff on this project. So, we can move 2383 03:23:42,500 --> 03:23:52,140 on to our next agenda item. Can I, I'm sorry. You sure can jump in. Sure, Dan. Ask one of 2384 03:23:52,140 --> 03:23:57,380 the planners, Katie, can you give an update on when this is projected to go to the village 2385 03:23:57,380 --> 03:24:05,260 board or so in her slide I know you don't have to get bring that up I just 2386 03:24:05,260 --> 03:24:13,520 remember if I remember being it at being there December there is only the one 2387 03:24:13,520 --> 03:24:24,220 village board meeting in December as the holidays so I just wanted everybody who's 2388 03:24:24,220 --> 03:24:28,500 on the call to be re-reminded of that in case they wanted to follow this further. 2389 03:24:29,200 --> 03:24:33,400 I think that's a great suggestion, especially since I'm sure the petitioner wants to hear 2390 03:24:33,400 --> 03:24:33,700 it too. 2391 03:24:37,020 --> 03:24:41,360 My agenda says other business, but let's just go straight to the trustee report. 2392 03:24:41,820 --> 03:24:43,200 Mr. Enright, are you still there? 2393 03:24:44,240 --> 03:24:44,920 Yeah, I'm here. 2394 03:24:45,360 --> 03:24:45,720 Can you hear me? 2395 03:24:45,740 --> 03:24:45,940 Excellent. 2396 03:24:46,180 --> 03:24:46,860 And we sure can. 2397 03:24:47,060 --> 03:24:47,480 Loud and clear. 2398 03:24:48,200 --> 03:24:48,600 Great. 2399 03:24:49,200 --> 03:24:50,040 Interesting meeting. 2400 03:24:50,040 --> 03:24:56,160 thanks a lot everybody for sticking out for the three hours or so and so what we 2401 03:24:56,160 --> 03:25:03,120 do what you do exactly that's what everybody else does too right and so 2402 03:25:03,120 --> 03:25:07,560 just the thing that we've been working on lately on the Village Board is the 2403 03:25:07,560 --> 03:25:14,600 budget and the last reading of the budget was for around $65 million for 2404 03:25:14,600 --> 03:25:21,980 this year, which was less than last year, which was $77 million, mostly due to the building 2405 03:25:21,980 --> 03:25:23,600 of the parking garage. 2406 03:25:24,000 --> 03:25:26,840 And so we had the first reading last week. 2407 03:25:27,320 --> 03:25:32,340 And then the next reading, the final reading will also be coming on that 14th of December 2408 03:25:32,340 --> 03:25:32,680 meeting. 2409 03:25:32,940 --> 03:25:35,820 And so watch for that at that time. 2410 03:25:36,520 --> 03:25:41,820 And then, and then otherwise, you know, some of the things that we've been talking 2411 03:25:41,820 --> 03:25:47,780 about our like the McKee house and you know what's going on with trying to save it and whether or 2412 03:25:47,780 --> 03:25:54,160 not we're going to be able to come up with any donations to be able to remodel the house and get 2413 03:25:54,160 --> 03:26:02,220 it ready for other uses which you know some of the civic groups are working on now and so for 2414 03:26:02,220 --> 03:26:06,520 the most part that's what we've been doing a lot of workshops and budgets I can tell you that 2415 03:26:06,520 --> 03:26:08,740 So thanks for everybody's time. 2416 03:26:09,620 --> 03:26:10,380 All right. 2417 03:26:10,480 --> 03:26:11,340 Thank you very much. 2418 03:26:12,800 --> 03:26:14,980 The chairman report is next. 2419 03:26:15,480 --> 03:26:16,940 I just have a couple of things. 2420 03:26:17,140 --> 03:26:25,300 First off, the civic betterment party is conducting the elections for the village offices of the library board, the village board and village president. 2421 03:26:25,920 --> 03:26:32,280 So if you haven't voted Saturdays, because there was early voting, but that is even ended for tonight. 2422 03:26:32,920 --> 03:26:37,880 But Saturday from 9 to 2, you can vote at the Civic Center in person. 2423 03:26:38,340 --> 03:26:51,120 And I voted last Saturday in the early voting, and I actually thought they did a great job of the way they handled the separation of all the different voting booths and sanitizing the pens if you wanted to use their pen. 2424 03:26:51,320 --> 03:26:56,440 I just thought they did a very, I felt a very safe, you know, environment for voting. 2425 03:26:56,980 --> 03:27:07,160 If you're uncomfortable even with that, they're offering two drive through voting options, one at the village links and one at the parking lot west of the library. 2426 03:27:07,740 --> 03:27:16,340 I'm not quite sure how it works, but my guess is you'll drive in. They'll check your IDs to ensure that you're resident of Glen Ellen and give you a ballot. 2427 03:27:16,580 --> 03:27:23,020 You probably pull over to a car and fill out your ballot and then pull out to an exit location where you're turning your ballot in. 2428 03:27:23,020 --> 03:27:32,520 But I think it's a neat opportunity, you know, COVID has created some interesting solutions that I think that we'd stick with for a long time. 2429 03:27:32,640 --> 03:27:38,880 And I think both the Civic Veteran Party early voting and this drive through voting might be something that would stick around for a while. 2430 03:27:39,160 --> 03:27:43,920 So, but I encourage everybody to vote this Saturday and vote for Mary Locke for a village president. 2431 03:27:44,920 --> 03:27:49,840 It's okay, you want a little bit of an asterisk for an opinion there. 2432 03:27:50,600 --> 03:27:55,640 The next thing I wanted to mention is the COVID situation, and only just because this 2433 03:27:55,640 --> 03:28:00,920 is the mother in me coming out, I feel like we've been practicing for six months with 2434 03:28:00,920 --> 03:28:04,620 our mask and our hands sanitizing and not rubbing our eyes, and it's interesting to 2435 03:28:04,620 --> 03:28:07,780 watch a Zoom meeting and see people rub their eyes, and I just want to just grab 2436 03:28:07,780 --> 03:28:09,580 their hand and say, please stop doing that. 2437 03:28:09,580 --> 03:28:14,240 Anyway, what I'd really want to just say is everybody, be safe, we're going into the 2438 03:28:14,240 --> 03:28:19,420 next six months, we've got a six month test and now the real test is happening, you know, 2439 03:28:19,500 --> 03:28:20,240 so be safe. 2440 03:28:20,820 --> 03:28:23,360 So that's my thoughts on, in my report. 2441 03:28:23,800 --> 03:28:24,940 So do we have a staff report? 2442 03:28:25,440 --> 03:28:27,080 That's our next agenda item, okay? 2443 03:28:27,420 --> 03:28:28,620 Who is giving the staff report? 2444 03:28:28,740 --> 03:28:29,060 Is that Kelly? 2445 03:28:29,680 --> 03:28:30,940 I saw her nodding her head. 2446 03:28:31,280 --> 03:28:32,460 Anybody is welcome. 2447 03:28:32,640 --> 03:28:34,480 I do have two things that I wanted to chat about. 2448 03:28:34,600 --> 03:28:38,440 Katie, did you have anything that you wanted to head it off with, the staff part? 2449 03:28:38,440 --> 03:28:49,330 you're muted. I can just share that Mortensen, the consultant for design 2450 03:28:49,330 --> 03:28:56,210 build firm for the Village parking garage, did submit their final beauty plans 2451 03:28:56,210 --> 03:29:01,910 and a preliminary beauty amendments related to a couple screening items of 2452 03:29:01,910 --> 03:29:06,390 utilities that are going to be near that public space. So we are still 2453 03:29:06,390 --> 03:29:11,950 targeting the December 17th meeting. Now that the quorum has been confirmed for that date, 2454 03:29:12,630 --> 03:29:17,710 but that's the only thing that I have coming up to you guys next month. 2455 03:29:18,950 --> 03:29:24,230 Okay. A quick update on the streetscape materials. If you all haven't been out to the corner of 2456 03:29:24,230 --> 03:29:28,550 Preston and Maine right over by M&Ms on the south side and east side of that building, 2457 03:29:28,870 --> 03:29:34,410 there have been installed some new streetscape materials. There's a great 2458 03:29:36,130 --> 03:29:39,530 little scanner thing that you use your cell phone to take your cell phone with you when you go. 2459 03:29:39,950 --> 03:29:44,010 You use a little scanner, it pops up the website and it's really easy to vote for your favorite materials. 2460 03:29:44,130 --> 03:29:46,790 I would encourage everybody to get out and give your input on that. 2461 03:29:47,730 --> 03:29:52,050 As, you know, over the next couple of months we're going to be trying to gather as much input from the community 2462 03:29:52,690 --> 03:29:56,030 on what everybody's favorite materials are for the new streetscape. 2463 03:29:56,030 --> 03:29:59,970 Secondly, comprehensive... 2464 03:30:00,000 --> 03:30:06,640 I just received this week from our consultant the full document. It is up on their website 2465 03:30:06,640 --> 03:30:12,060 if anybody wants to have a little preview. We have scheduled two open house meetings 2466 03:30:12,060 --> 03:30:17,440 and we're really hoping that we can have them given what's going on with the COVID situation. 2467 03:30:18,520 --> 03:30:22,300 We're going to do our best to make sure that we can do the in-person open house at the 2468 03:30:22,300 --> 03:30:27,140 village hall November 18th. That's going to be from 5 o'clock to 7 p.m. 2469 03:30:28,820 --> 03:30:32,920 We're going to do our best to make sure there's less than 10 people in the gymnasium at all 2470 03:30:32,920 --> 03:30:33,280 times. 2471 03:30:33,440 --> 03:30:35,020 Everybody's going to be required to wear a mask. 2472 03:30:35,260 --> 03:30:36,420 It will be social distance. 2473 03:30:36,620 --> 03:30:38,040 That's why we're in a big gymnasium. 2474 03:30:39,080 --> 03:30:44,520 So unless, you know, the governor creates some additional restrictions on, you know, 2475 03:30:44,540 --> 03:30:48,140 meeting spaces and so forth, we're going to try to have that in-person open house. 2476 03:30:48,660 --> 03:30:51,760 For folks who don't feel comfortable coming out to that, we will have the second 2477 03:30:51,760 --> 03:30:54,360 open house the very next day, November 19th. 2478 03:30:54,360 --> 03:30:57,540 That will run from 6 to 7 p.m. And that will be done via zoom 2479 03:30:58,480 --> 03:31:01,820 administered by director Springer myself and 2480 03:31:02,360 --> 03:31:05,280 Any of the other planners who want to participate that evening? 2481 03:31:06,740 --> 03:31:10,100 and then finally I just wanted to mention that the 2482 03:31:10,100 --> 03:31:17,740 Draft comprehensive plan the first of three public hearings before the plan commission has been tentatively scheduled for December 10 2483 03:31:18,320 --> 03:31:22,240 Again, that's provided. We get to have the open houses that we're expecting to have 2484 03:31:22,240 --> 03:31:27,120 And not any issues was covered that further restrict us being able to do that. 2485 03:31:27,240 --> 03:31:30,360 So that is all of the updates that I have. 2486 03:31:30,480 --> 03:31:41,220 Oh, one other thing we are expecting to be bringing back cannabis to the Village Board for consideration at a workshop meeting first, Stacy, right? 2487 03:31:41,380 --> 03:31:41,680 Is that correct? 2488 03:31:41,820 --> 03:31:48,060 Yes, we are going to be doing it at the December 7th Village Board workshop meeting for a discussion. 2489 03:31:49,180 --> 03:31:52,180 Kelly, do you want to wrap that up or you want me to pick up from there? 2490 03:31:56,440 --> 03:32:14,660 Okay, so essentially we're just going to kind of be putting together a quick memo that kind of reminds them of where we've been and what the recommendation was from the plan commission on the proposed text amendments way back when that would allow recreational cannabis to be sold only in the C3 zoning district with a special use. 2491 03:32:14,660 --> 03:32:19,000 They should decide that they would like to allow those types of businesses in the village. 2492 03:32:19,360 --> 03:32:32,700 There were a number of other restrictions that the plan commission recommended as well, such as no, you know, onsite smoking anywhere or onsite consumption rather certain safety measures and so forth, those types of things. 2493 03:32:32,780 --> 03:32:35,040 So they'll be getting a memo regarding that we did have. 2494 03:32:35,880 --> 03:32:40,820 you know on the ballots the question to the community, the community came back 2495 03:32:40,820 --> 03:32:44,840 basically 50-50 split as we kind of seen through all the surveys that we done we 2496 03:32:44,840 --> 03:32:48,820 had done prior to bringing the question to the plan commission and to the 2497 03:32:48,820 --> 03:32:52,200 village board the community was really split down the middle so we'll see 2498 03:32:52,200 --> 03:32:59,980 where they take it from there. Okay thank you. So we have a if we if we 2499 03:32:59,980 --> 03:33:06,760 didn't have our the comprehensive plan meeting on the can't happen on the 2500 03:33:06,760 --> 03:33:11,820 10th because we don't have we haven't heard what was going to be on the 10th 2501 03:33:11,820 --> 03:33:15,240 comprehensive plan right the public hearing for the comprehensive plan 2502 03:33:15,240 --> 03:33:20,060 plans of plan if we if we can't have it on the 10th would we move what was 2503 03:33:20,060 --> 03:33:25,200 going to be on the 17th to the 10th then I don't believe so so the issue 2504 03:33:25,200 --> 03:33:31,880 with that. I, as I had kind of tried to allude to in my email T-wall was we're on a really 2505 03:33:31,880 --> 03:33:38,100 kind of tight timeline. I think it's nearly, it's close to impossible, but we're going to 2506 03:33:38,100 --> 03:33:43,560 try to pull it off. And it's a really tight turnaround for the reviews like one week in 2507 03:33:43,560 --> 03:33:49,020 between submitting review, submitting review, which is a little atypical for us. So I think 2508 03:33:49,020 --> 03:33:54,760 that's as expedited as it could get. If that's, if I'm speaking out of time, 2509 03:33:54,760 --> 03:34:06,880 Okay. No, that's fine. I was just, I was just wondering if for some reason it did. The 10th didn't happen. We wouldn't do the 10th, but then we'd still have the other item on the 17th. 2510 03:34:07,100 --> 03:34:07,460 Yeah. 2511 03:34:09,160 --> 03:34:10,240 You correct me if I'm wrong, Lee. 2512 03:34:11,260 --> 03:34:12,520 No, I agree. 2513 03:34:13,440 --> 03:34:18,240 And maybe I can wrap it up unless Katie had something else you wanted to share. 2514 03:34:18,240 --> 03:34:30,660 So thank you for a couple of the commissioners extended their appreciation to the planning staff to bring this project forward. 2515 03:34:31,240 --> 03:34:44,040 I don't know that a lot of people recognize the amount of work that goes into that and Katie has managed this case from the very beginning and she's done a great job this is her. 2516 03:34:44,580 --> 03:34:48,640 She's really only been here a little more than a year, although I feel like she's been here forever. 2517 03:34:49,380 --> 03:34:55,380 And she's doing a fabulous job and she put in a ton of hours on this. 2518 03:34:55,820 --> 03:35:00,580 And Cole and Kelly helped out this week too, trying to pull everything together. 2519 03:35:01,760 --> 03:35:10,000 But it is, it's a lot of work and they have been putting in a lot of extra hours, because this isn't the only project we've got going on. 2520 03:35:10,000 --> 03:35:13,440 We have a lot of really high priority projects on our plate right now. 2521 03:35:13,880 --> 03:35:20,300 And so thank you for noticing that they're doing a really great job. 2522 03:35:21,300 --> 03:35:28,020 I also wanted to give you a little bit of an update on something exciting I'd like to share. 2523 03:35:28,880 --> 03:35:32,520 Back effective on October 30th. 2524 03:35:32,580 --> 03:35:35,280 We had a promotion in the department actually we had to. 2525 03:35:35,280 --> 03:35:49,420 But we've been trying to work on ways in the department to streamline our operations and use our time and our resources more effectively. 2526 03:35:50,400 --> 03:36:03,660 And in doing that, we recognize that there's a lot on a lot of people's plates and we can best accomplish that by having someone supervising the planning division. 2527 03:36:03,660 --> 03:36:11,280 for the department. So right now we've had a building official supervising the 2528 03:36:11,280 --> 03:36:17,160 building division and I have been supervising the planning division which 2529 03:36:17,160 --> 03:36:21,460 I've not been able to keep up with as well as I would like to and also for 2530 03:36:21,460 --> 03:36:26,340 succession planning it would be good to have someone else be able to do what I 2531 03:36:26,340 --> 03:36:31,620 do. So I am pleased to announce that we have promoted Kelly Purvis from 2532 03:36:31,620 --> 03:36:34,100 planner to planning manager. 2533 03:36:37,020 --> 03:36:42,320 Congratulations. Thanks. Way to go. She is well deserving. 2534 03:36:43,220 --> 03:36:48,040 She's been with the village five years now. Is it five or six? A little more than five. 2535 03:36:48,520 --> 03:36:52,060 Okay and she started, I don't know if you remember this, but she started as a planning 2536 03:36:52,060 --> 03:36:58,740 intern back in 2014 and then we hired her as a associate planner and then we promoted her 2537 03:36:58,740 --> 03:37:04,100 planner and now she is planning and she is well deserving of this recognition. I tell you 2538 03:37:04,100 --> 03:37:10,920 it's only been a couple of weeks but already things are running smoother and she's got it all under 2539 03:37:10,920 --> 03:37:17,900 control and I have the greatest respect and confidence in her and I know she'll do a fabulous 2540 03:37:17,900 --> 03:37:23,440 job. So congratulations. Congratulations Kelly. Thank you guys very much. Appreciate it. 2541 03:37:24,600 --> 03:37:26,040 I think that's all I have. 2542 03:37:26,420 --> 03:37:28,300 Well, that's a lot. We like that one. 2543 03:37:28,440 --> 03:37:29,360 And I love going, you know, 2544 03:37:29,420 --> 03:37:30,780 love ending this on a high note, 2545 03:37:30,840 --> 03:37:33,480 unless somebody else has something else that I'd like to bring up to the 2546 03:37:33,480 --> 03:37:34,600 plan commission at this point. 2547 03:37:36,480 --> 03:37:39,940 Otherwise I don't really need a motion to adjourn, but I'll take one. 2548 03:37:40,900 --> 03:37:41,740 So moved. 2549 03:37:42,100 --> 03:37:42,760 At a second. 2550 03:37:44,440 --> 03:37:47,300 Meeting adjourned. Thank you all. Really appreciate it. 2551 03:37:47,900 --> 03:37:49,020 Happy Thanksgiving, you guys. 2552 03:37:49,640 --> 03:37:52,080 Happy Thanksgiving. Stay safe. 2553 03:37:55,580 --> 03:37:56,560 Good luck, Mary! 2554 03:37:57,140 --> 03:37:58,100 Oh, thank you! 2555 03:37:58,980 --> 03:37:59,680 Good luck, Mary! 2556 03:37:59,860 --> 03:38:00,720 Go vote, guys!