1 00:00:00,000 --> 00:00:03,000 Awesome. 2 00:00:04,560 --> 00:00:10,639 Hearing none, we'll move back to the board for a vote. All those 3 00:00:09,599 --> 00:00:14,480 » in favor? I >> I 4 00:00:11,040 --> 00:00:20,480 » and that passes unanimously. Thank you. >> All right. Next up, 5 00:00:17,760 --> 00:00:25,840 » city has supported many organizations that provide services or programs to its 6 00:00:23,119 --> 00:00:31,119 residents more efficiently. City could provide those services. 7 00:00:28,080 --> 00:00:36,160 organizations considered for or subject to an application process 8 00:00:34,000 --> 00:00:42,160 which includes a detailed description of how the funds are used. Organizations 9 00:00:38,320 --> 00:00:48,320 chosen must account for funds for city manure into an agreement with Laasa Go 10 00:00:45,040 --> 00:00:55,719 in to support the empower partnership for 11 00:00:49,840 --> 00:00:55,719 progress project for $25,000. 12 00:00:57,199 --> 00:01:04,000 Thank you. Questions, comments, or a motion from the board? 13 00:01:01,359 --> 00:01:10,400 I move that the city of Goan approve the agreement with Lasso Go, Inc. to support 14 00:01:07,040 --> 00:01:17,360 the Empower Goan part partnership for progress project for $25,000 to support 15 00:01:14,880 --> 00:01:21,680 work described in the agreement and authorizing it to execute the agreement. 16 00:01:21,200 --> 00:01:24,720 » Second. >> We have a motion and a second. Any 17 00:01:23,200 --> 00:01:28,400 questions or comments from anybody in the audience? Hearing none, we'll move 18 00:01:26,720 --> 00:01:33,040 back to the board for a vote. All those in favor? I. 19 00:01:30,000 --> 00:01:37,720 » That passes unanimously. Next item is a request from the engineering department. 20 00:01:38,880 --> 00:01:45,920 » Good afternoon board engineering department. 21 00:01:42,960 --> 00:01:50,240 You have before you this afternoon for your consideration 22 00:01:47,759 --> 00:01:55,520 Stere Avenue and Lincoln Avenue reconstruction drainage improvements 23 00:01:52,720 --> 00:02:01,040 change order number eight job number 2019 00046. 24 00:01:58,560 --> 00:02:08,000 The intersection of Lincoln Avenue contain large areas of 25 00:02:04,960 --> 00:02:14,000 unsuitable material. Tensar provided on-site DCP testing which revealed areas 26 00:02:11,360 --> 00:02:18,400 of low strength soils as thick as 2 feet. After review of several 27 00:02:16,560 --> 00:02:23,280 alternatives and in consultation with tensor staff determined that 28 00:02:20,640 --> 00:02:28,640 undercutting of 10 installing two layers of tensor and interacts geog grid with 29 00:02:26,879 --> 00:02:33,519 aggregate in between would provide the most economical means of adequately 30 00:02:31,200 --> 00:02:38,560 stabilizing the subgrid. This provided this provides a required 31 00:02:36,160 --> 00:02:43,440 bearing capacity in the roadway and also allows for approved roll test on top of 32 00:02:41,040 --> 00:02:49,040 the air subbase prior to the placement of top access wall base. Estimated cost 33 00:02:46,480 --> 00:02:53,200 of all the alternatives reviewed as well as plan sheets showing the estimated 34 00:02:50,879 --> 00:02:59,120 area required under cutting are attached. Order number eight includes 35 00:02:55,440 --> 00:03:04,000 estimated cost for this multiaxial grid. The additional quantity 53 36 00:03:02,319 --> 00:03:08,400 aggreate used for undercutting and the difference between the installed 37 00:03:05,280 --> 00:03:13,360 material only cost for the TX type 2 grip material 38 00:03:11,440 --> 00:03:17,599 this area but will not be used within this intersection. Change order number 39 00:03:15,760 --> 00:03:21,680 eight does not include cost for common excavation which would have been 40 00:03:19,519 --> 00:03:26,480 necessary regardless of the undercutting method. No additional fees are being 41 00:03:24,319 --> 00:03:33,599 requested to complete this work. The block excavating price price of $7.76 42 00:03:29,840 --> 00:03:37,840 per square yard for the NX750 geog grid. This comparable pricing on other recent 43 00:03:36,080 --> 00:03:44,000 and current city projects using the same material. Go engineering requests the go 44 00:03:41,519 --> 00:03:48,879 public works approved change rate for $37,55. 45 00:03:46,560 --> 00:03:53,120 This change along with previous changes increases the value of the contract by 46 00:03:50,720 --> 00:03:56,159 3.67%. 67% approved. This change order is 47 00:03:54,400 --> 00:04:02,959 anticipated by the go redevelopment commission after June 9th 2026 meeting 48 00:04:00,720 --> 00:04:06,560 has been approved provided redevelopments authorization and updated 49 00:04:04,879 --> 00:04:11,599 copy of the chamber will be provided for. 50 00:04:09,280 --> 00:04:16,760 » Thank you. Uh 51 00:04:13,120 --> 00:04:16,760 question for you 52 00:04:18,000 --> 00:04:26,720 conditioned on the redevelopment the redevelopment commission's approval that 53 00:04:23,680 --> 00:04:29,600 it does not have to come back or to save that extra step. 54 00:04:27,759 --> 00:04:35,199 » So it's it's been approved. >> It has been I thought 55 00:04:32,320 --> 00:04:37,919 » it was it was approved earlier this week. So 56 00:04:36,160 --> 00:04:42,960 » never mind. >> Sorry about that. each night jumped 57 00:04:41,199 --> 00:04:45,840 across that part. It's been approved, so it's ready for your 58 00:04:43,759 --> 00:04:48,080 » Roger that. Okay, great. Questions, comments, or a motion. 59 00:04:47,440 --> 00:04:53,440 » Yes, sir. >> Did we just approve a change order for 60 00:04:49,840 --> 00:05:00,400 the same for the same thing >> related? So, it's been a dual effort to 61 00:04:57,759 --> 00:05:06,720 uh the intention of going in there once getting it right the first time. So, we 62 00:05:02,560 --> 00:05:12,800 we added some additional uh drainage. Um if you think about spokes on a wheel, 63 00:05:09,759 --> 00:05:19,280 the drainage pipe was installed in that fashion to wick the water away from 64 00:05:16,000 --> 00:05:26,320 below. And additionally, this geode grid um was placed above that 65 00:05:23,600 --> 00:05:32,160 uh pipe drainage layer and the associated excavation and stone. 66 00:05:29,440 --> 00:05:37,919 » So this wasn't known at the point that we were digging to put the other in, 67 00:05:35,280 --> 00:05:45,280 » right? It was just as we as we worked through it, right? That helped some and 68 00:05:41,759 --> 00:05:50,400 and we took the next step to install the the 69 00:05:47,600 --> 00:05:54,800 next question. >> We have a motion from the board. I move 70 00:05:52,400 --> 00:06:01,520 to approve change order number eight in the amount of $37,55 71 00:05:58,400 --> 00:06:06,560 to address unsuitable materials that stabilize the subgrade with a high 72 00:06:04,240 --> 00:06:11,039 performance geo grid at the intersection of Lincoln Avenue at Story Avenue. 73 00:06:09,280 --> 00:06:15,520 » Second. Have a motion and a second. Questions or comments from the audience? 74 00:06:13,680 --> 00:06:22,120 We move back to the board for a vote. All those in favor? 75 00:06:18,080 --> 00:06:22,120 » Excellent. That passes unanimously. 76 00:06:24,560 --> 00:06:27,880 Item number 77 00:06:28,479 --> 00:06:38,880 on the agenda, Cal Avenue, phase one, room quarter for NIPCO electric utility 78 00:06:33,360 --> 00:06:49,520 relocation as number 1900 739 21101 631 25501 441 job number 2019 0022 79 00:06:46,880 --> 00:06:56,800 electric is requesting to close college through traffic from Lincoln Way East US 80 00:06:53,360 --> 00:07:01,199 33 to Centry Drive on Tuesday, June 16th and Wednesday, June 17th, 2026. There 81 00:06:59,680 --> 00:07:04,960 will be a hard loader near the bridge over corner 82 00:07:03,360 --> 00:07:10,160 requesting this closure to remove construction mass following utility pole 83 00:07:07,840 --> 00:07:14,880 and overhead power line relocations for the College Avenue phase one roadway 84 00:07:12,400 --> 00:07:19,120 reconstruction project. The closure will utilize the same as the traffic plan as 85 00:07:17,039 --> 00:07:23,919 submitted and reviewed in March which engineering staff approved as part of 86 00:07:20,880 --> 00:07:26,960 the rightway permit. Copy the plan is attached. 87 00:07:25,039 --> 00:07:30,560 » Thank you. Questions, comments or motion? 88 00:07:28,319 --> 00:07:34,919 » I move to approve the closure of Cottage Avenue from Lincolnway East 89 00:07:35,599 --> 00:07:43,759 S33 East to Century Drive on June 16th and 17th, 2026. 90 00:07:41,919 --> 00:07:47,840 » Second. We have a motion and a second. Questions from the audience. 91 00:07:46,319 --> 00:07:51,479 We'll move back to the board for a vote. All those in favor 92 00:07:57,280 --> 00:08:04,800 » Justin for Works Utilities. What we have today is Keystone uh Square 16 93 00:08:03,199 --> 00:08:09,759 acceptance of the drainage plan job number 2026 2013. Uh, in accordance with 94 00:08:08,080 --> 00:08:15,039 the city's subdivision control ordinance 3196 section 512 drainage plan, the city 95 00:08:13,520 --> 00:08:20,240 engineering department has reviewed the drainage plan for Keystone Square 16th 96 00:08:17,280 --> 00:08:24,960 located at 2490 Birkshshire Drive. The drainage plan addresses the drainage 97 00:08:22,000 --> 00:08:27,919 needs for lot 20 and lot 20 only with a combination of inlet structures, 98 00:08:26,319 --> 00:08:33,200 conveyance pipes, and storm water retention that provides 138 acre feet of 99 00:08:30,800 --> 00:08:37,200 storage. After due consideration of the proposed drainage plan, go engineering 100 00:08:35,919 --> 00:08:41,200 department recommends the board of public works and safety and storm water 101 00:08:39,200 --> 00:08:46,320 board accept the subdivision drainage plan. Standard note typically go along 102 00:08:44,399 --> 00:08:49,600 with this is that the uh record should show the city of goan in no way 103 00:08:48,240 --> 00:08:52,720 guarantees the proposed drainage improvements will adequately function as 104 00:08:51,120 --> 00:08:56,080 designed by the developer's licensed professional. Additionally, the city 105 00:08:54,399 --> 00:09:01,360 accepts no liability conjunction with this acceptance of the drainage plan. If 106 00:08:58,720 --> 00:09:06,480 drainage plant plants piping and storm water impoundments are found to be to 107 00:09:04,399 --> 00:09:11,760 underperform construction, the developer and or propert will be directed by the 108 00:09:08,720 --> 00:09:14,880 city to take additional remedial action. At that time, 109 00:09:13,040 --> 00:09:20,480 » thank you. Questions, comments, or a motion to move forward. I move uh we 110 00:09:17,839 --> 00:09:25,600 approve the uh subdivision train plan for Keystone 111 00:09:24,080 --> 00:09:31,440 Square 16 lot 20 and lot 20 112 00:09:29,519 --> 00:09:39,399 second. We have a motion and second questions or comments from the audience 113 00:09:34,480 --> 00:09:39,399 back for a vote. All those in favor 114 00:09:47,920 --> 00:10:00,640 just to uh follow on last acceptance square 115 00:09:57,519 --> 00:10:07,279 and it's secondary sub subdivision for your acceptance. 116 00:10:02,480 --> 00:10:12,160 The PL we signed here is all subdivision and so ordinance 117 00:10:10,320 --> 00:10:20,040 requirements there is existing infrastructure 118 00:10:14,800 --> 00:10:20,040 and just accepted to subdivision trans 119 00:10:20,079 --> 00:10:28,880 » questions comments or motion from the board. I move to accept the subdivision 120 00:10:24,800 --> 00:10:31,920 flat for Keystone Square 16 with easements. 121 00:10:31,120 --> 00:10:35,839 Second. >> We have a motion. Second. Questions or 122 00:10:33,600 --> 00:10:41,079 comments from the audience? None. We'll go back to the board for a vote. All 123 00:10:37,680 --> 00:10:41,079 those in favor? 124 00:10:43,360 --> 00:10:51,279 » Yes. Uh this next request, if you if you ever had your monthly replacement at the 125 00:10:49,760 --> 00:10:56,800 DN D. Uh this is this site 28 South 126 00:10:54,560 --> 00:11:02,640 Edition. And what we have in front of you is 127 00:10:58,560 --> 00:11:07,680 request to accept a replat of that lot 28 128 00:11:04,320 --> 00:11:14,560 to allow the building where DMT was and then and then another lot for 129 00:11:11,519 --> 00:11:19,440 so it's a replat for a two lot minor subdivision infrastructure is existing 130 00:11:17,279 --> 00:11:22,959 obviously um there's no subdivision drainage plan required and it meets 131 00:11:21,519 --> 00:11:25,279 zoning ordinance and subdivision requirements. 132 00:11:25,839 --> 00:11:34,560 Stephanie's doing a great job there. Questions, comments, or motion. 133 00:11:31,760 --> 00:11:39,680 I move to accept the subdivision in uh PL for W 28 South edition. 134 00:11:39,200 --> 00:11:43,040 » Second. >> We have a motion and a second. Questions 135 00:11:41,200 --> 00:11:46,959 or comments from the audience? Hear none. Back to the board for a vote. All 136 00:11:45,040 --> 00:11:50,800 those in favor. That passes unanimously as well. That 137 00:11:49,200 --> 00:11:55,560 brings us to privilege of the floor. Anybody with a question or comment? 138 00:11:55,600 --> 00:12:02,160 » No one. I move that we approve civil city and utility claims and adjourn. 139 00:12:00,399 --> 00:12:08,040 Second. We have a motion and a second. All those in favor? 140 00:12:03,279 --> 00:12:08,040 » I. We are journed. Thank you, 141 00:12:08,480 --> 00:12:11,920 » Mayor. That was kind of the leading.