[0:00] He likely won't get here. He's dealing [0:01] with a car broke out on the side of the [0:03] road that his son [0:04] >> had a small issue with. And then Jeff is [0:07] coming from [0:10] the mosquito abatement meeting as soon [0:11] as he's finished. [0:14] >> Um, [0:21] [clears throat] [0:28] welcome everybody. This is a combined [0:30] work meeting of the Grantsville City [0:32] Council and the Planning Commission. For [0:34] the record, today's date is April 14th, [0:37] 2026, and the time is 7:02 p.m. This [0:40] meeting is being held at the Grantsville [0:42] City Council Chambers at 429 East Main [0:45] Street, Grantsville, Utah, as well as [0:48] electronically by Zoom. I am Mayor Heidi [0:51] Hammond, and I will conduct a roll call. [0:53] Council Member Thomas is not here at the [0:56] moment. We will um add his name if he is [0:58] able to arrive. Council member Williams [1:01] is excused for the first half hour as he [1:03] is attending another meeting. Council [1:05] member Butler [1:06] >> present. [1:07] >> Council member Dalton [1:08] >> here. [1:09] >> Council member Skinner [1:10] >> here. [1:11] >> Planning Commission Chair Moore [1:14] >> here. [1:15] >> Uh Commissioner Hill [1:16] >> here. [1:17] >> Commissioner Montgomery [1:19] >> here. [1:19] >> Commissioner Merrill here. [1:21] >> Commissioner Molton here. Alternate [1:23] Commissioner Horox [1:28] not present. Um, if you would please [1:30] join me in the pledge of allegiance. [1:38] » I aliance to the flag of the United [1:42] States of America and to the republic [1:45] for which it stands, one nation under [1:48] God, indivisible, with liberty and [1:50] justice for all. Thank you. [1:58] The purpose of tonight's meeting is to [2:00] hear presentations regarding the [2:02] Grantsville City master plan and the [2:04] proposed amendments to the park and [2:06] transportation capital facilities plans [2:09] impact fee facilities plans and the [2:11] impact fee analysis. These are only [2:14] presentation and discussion and no [2:16] formal action will be made tonight or [2:19] public comment taken. Uh, agenda item [2:23] number one is a discussion regarding the [2:24] Grantsville City Master Transportation [2:27] Plan, including current conditions, [2:29] future transportation needs, and [2:31] potential improvements. [2:35] » Thank you. [2:36] >> I'm assuming that's my [2:37] >> I think that's your cue. Yes. [laughter] [2:39] >> I'm going to move these tall chairs so I [2:41] can see everybody. [2:43] >> Um, [2:44] >> are you wanting to plug in? [2:46] >> Yes. [2:47] >> You want to sit down and plug in or do [2:48] you want to plug in? [2:51] Um, [2:54] yeah, I'll stand up there. Actually, [2:55] that's probably easier. [3:09] » Planning Commission, you get to see my [3:11] good side. Uh, council, you get to see [3:13] my bad side. [clears throat] So, [3:16] um, [3:17] okay. First off, I'll go ahead and [3:19] introduce myself. Um, I apologize. My [3:23] counterpart that's norm normally with [3:25] me, we got double booked tonight, so [3:27] he's in Helper City tonight. Um, I got [3:29] to draw the good straw and come to [3:31] Grantsville. Um, I'm a clean farmer with [3:34] Jones and Deville Engineering. We used [3:36] to have an office in Tilla. We did close [3:40] that office because we couldn't find [3:42] anybody to to sit in it. Um, but we do [3:45] still do a lot of work up here for [3:47] Grantsville, Toilla County, um, Toilla [3:50] City, and other municipalities. [3:52] Um, I'm [clears throat] out of our [3:54] headquarter office, which is in [3:56] Richfield, um, Utah, down in central [3:59] Utah, but we serve basically everywhere [4:03] in in Utah, some in Colorado, and some [4:06] in Idaho as well. [4:08] Um [4:09] we've been working on this [4:11] transportation plan for the past about [4:14] eight months. Um working through the [4:18] model. The model is pretty intense here [4:20] in the Twilla Tilla Valley. Um just to [4:24] give you some background on myself and [4:26] the work that we've done here, I did the [4:28] Twilla County transportation master [4:30] plan. We partnered with Methods [4:32] Consulting on this one as well as the [4:35] Toilla Valley um transportation plan and [4:39] then we um Methods Consulting did your [4:42] West Bank study and that's who we used [4:44] for the modeling piece of this study as [4:46] well. Um [clears throat] so to give you [4:51] some background, we started this study [4:53] with data collection. We worked with [4:55] UDOT. UD do just finished up their [4:58] regional transportation plan here in the [5:00] Twilla Valley as well. So, we used that [5:03] as our basis to start with the planning [5:06] process. Um, [clears throat] and I'm [5:09] going to get into a little bit more [5:10] detail on that here in a few minutes. I [5:12] apologize. It's been really windy in [5:14] Richfield, so I my allergies have kicked [5:16] up, so I'll be taking some water breaks [5:19] here here and there. Um, so long long [5:24] story short, we did data collection. We [5:26] brought all the data that we got and [5:28] brought it into a single spot. We then [5:31] took and added our traffic counts that [5:34] we did. You probably saw some tubes [5:36] throughout the city last year um across [5:39] the roads. As you drove over those [5:41] tubes, we counted each vehicle. We also [5:44] classified each vehicle. So, we got the [5:46] truck percentage that you guys um have [5:49] on each road on the major roads. We [5:51] didn't do every road. Um we also [5:55] collected um pavement condition um of [5:58] each road. And I'll show you the [6:00] condition of each road here in a minute [6:02] as well. And then we helped public works [6:04] with a pavement plan for how to get your [6:08] roads in better condition. I have that [6:10] as well tonight to show you as well. Um [6:13] the bulk of the work that we did though [6:15] was in the modeling and what happens in [6:18] the years 2035, 204, 2045 and at full [6:22] buildout. Um so I'm going to go through [6:26] each one of these maps. This is the [6:28] website that we created for you so you [6:30] have a place to house your [6:32] transportation plan. Um so I'm going to use this as the bulk of my [6:36] presentation tonight. Um for the [6:39] planning commission as well. This is an [6:41] open discussion um with the council with [6:45] planning commission. So if there are any [6:46] questions just interrupt me um if [6:49] somebody wouldn't mind if you guys just [6:51] yell um so I can stop I won't be able to [6:55] see you as well. Um [6:59] [clears throat] so [6:59] >> sorry [7:00] >> you're good. [7:02] Any questions before we start? [7:07] Okay. [7:09] All right. So, the website, and this is [7:12] going to be available for the public. I [7:14] will say we're going to hold a public [7:16] openhouse in two weeks. I just put a [7:19] poster up here in the front office. Um, [7:21] we emailed Shelby. Did you get that [7:24] email today? We emailed Shelby a flyer [7:27] to post on Facebook. And then we also [7:30] have a um a poster in the library as [7:34] well to advertise that. Um, so the [7:37] public openhouse will be held in two [7:38] weeks. There's QR codes on the posters [7:41] that you can access this website with. [7:44] You can view it on your phone. It's [7:47] [clears throat] not as user friendly on [7:48] a phone. I will say that it's a lot [7:50] easier to use on a computer itself. [7:54] Um, but starting with project overview, [7:57] I won't read all of this. You guys can [7:59] go through and read this um on your own, [8:02] but basically it talks about the need [8:04] for the study. gives a little bit of an [8:06] overview of Grantsville itself and [8:08] talking about the growth concerns and [8:10] challenges that Grantsville is seeing [8:13] currently. [8:15] The next tab [8:18] is your [clears throat] socioeconomic [8:19] data. Now, I have to put a caveat on [8:22] this data. Um, because the census was [8:27] done in 2020, this data is going to be [8:30] quite a bit off. The reason being is we [8:32] saw a lot of inflation from 2020 to [8:35] 2026. [8:36] Um so you'll see like uh median home [8:40] value that's probably a little low. Um [8:44] as well as some of the incomes and the [8:47] population data here as well. Um the [8:50] reason we don't put anything other than [8:53] the census data on here is those are [8:55] just projections. Um, and so we we we [9:00] put this data in here as our base. Um, [9:02] but we when we're doing the travel [9:04] demand modeling that we do for the [9:06] study, we don't use this data. We use um [9:11] data from the U of actually on current [9:14] population statistics. [9:20] All right. This is the bulk of the [9:22] conversation today. So, what I would [9:25] like to do is [9:28] go through each one of these maps [9:31] um with you. I'm going to breeze over [9:34] these maps quickly and then we're going [9:36] to come back and get into the fine [9:39] details of each map itself. Um so, the [9:43] roadway classification network um this [9:47] is the classification of roads within [9:50] the city. So the left hand side shows [9:54] the current classification. So you'll [9:56] see on the left hand side there's not a [9:58] lot of roads that are colored. [10:00] Uh each color means a different thing. [10:03] So like your red lines are your [10:04] highways, green are your minor [10:07] arterials. So sometimes those are [10:09] highways as well. Uh the purple are [10:12] major collectors. Those are typically [10:14] city streets that have high volumes. The [10:16] yellow roads are minor collectors. So [10:19] those come just under major collectors [10:22] and then the black are local roads. [10:24] [snorts] Um the orange are [10:28] um or expressways. Those are more like [10:31] your your freeway type roads as well. So [10:35] you can see on the left hand side that's [10:37] your current road network. On the right [10:39] hand side uh we're showing what the full [10:41] buildout would look like um for the [10:45] city. This [clears throat] does not [10:47] include local roads. We don't plan for [10:51] every street within the city. We simply [10:55] show the type of road that needs to go [10:57] in to get traffic to go in and [11:00] throughout the city and then we allow [11:03] build out between those roads itself. [11:07] I'm going to come back to this map. This [11:09] is probably the bulk of what we'll talk [11:11] about today and the questions that I [11:13] have for the council and the planning [11:15] commission. [11:16] Um, but I will I'll come back to this [11:19] map here in a minute. [11:20] >> Could we could we just pause for just a [11:22] second? [11:23] >> Can you guys all see that? Okay. Do you [11:25] want us to move [11:26] >> that? [11:28] Grab that. Shift it over. [11:30] >> Do these Do you guys have screens? [11:32] >> We all have screens. Oh, okay. [11:34] But everyone in the gallery [11:38] » now your neck won't be [11:41] >> this is this proposal we have here on [11:42] the right is that at 2050 or what year [11:45] >> yeah 2050 [11:47] >> it's not [clears throat] sharing on the [11:49] >> okay [11:49] >> zoom meeting [11:54] » do I need to do I need to log into Zoom [11:57] >> um not typically but it's not sharing on [11:59] the Zoom meeting person [12:02] why that would [12:04] Is there any way you could like X out of [12:06] the legend just really quick on your end [12:10] and just [12:11] >> There you go. I think that was kind of [12:13] helpful. Just [12:15] >> right. I tried that and that out. [12:20] » I'm just gonna try something really [12:22] quick. [12:23] >> Okay. [12:29] » This website [12:37] Well, it's not sharing his screen to [12:39] Zoom and the people online if anybody's [12:43] online. So, I'm trying to get it to [12:46] >> I can log in as well if I need to. [12:49] >> Do you would you mind and then that way [12:51] I know it will work. [12:52] >> Can you just send me the link? [12:54] >> Yeah. Okay. [12:57] >> We need to notify that um council member [12:59] Williams has joined us. Thank you. Thank [13:01] you. [13:07] » Um, do you just want to scan that short [13:09] code? There's that's all the [13:51] While they're working through some of [13:52] these technical things, I thought I [13:53] might give you a little bit of [13:54] background from a land use standpoint as [13:57] to how this all plays in together. And um [14:02] there are assumptions that are made with [14:04] regard to the data that um you start [14:07] with the the base population numbers and [14:09] then you try to [14:23] So you try to project out. Thank you. [14:26] >> That was my voice like 20 million times. [14:28] That was cool. [14:29] >> Um you try to project out based on the [14:32] anticipated growth, the um growth [14:35] patterns and the current zoning as well [14:38] as what uh could go in in those areas. [14:42] We look at areas that are in the [14:43] annexation plan. We look at areas that [14:46] are nearby adjacent development and we [14:49] try to put numbers to those things that [14:51] um are both in keeping with what we've [14:53] seen historically but also with uh what [14:57] we're going to project out for the next [15:00] 20 30 50 100 years. None of us has a [15:04] crystal ball obviously uh so we don't [15:07] know exactly how and when these [15:09] developments are going to come in and [15:10] when this would fill in but uh the the [15:14] conventional thinking is that if we [15:16] don't ask for the right of way now when [15:21] it comes time to [snorts] [15:24] develop out these areas and we need that [15:26] right of way if we haven't asked for it will never be there um I started work [15:32] in Saratoga Springs almost 20 years ago [15:35] and you would not have known 20 years [15:38] ago what a mess it would be like in [15:40] Saratoga Springs 20 years later. The [15:43] roads that were in however uh on the [15:47] plans then included some areas that had [15:49] 180 foot rideways. We're not asking for [15:52] anything near that much here. Well, [15:54] except for one road um which uh MLAN [15:57] we'll get into. But um I just bring that [16:00] up as a case study to point out that uh [16:03] we're doing the best we can here and [16:05] trying to plan for and project out where [16:07] what these roads will need to look like [16:09] and what network we're going to want to [16:12] see [16:13] for the next hundred years or or more. [16:17] Um there are roads as you know [16:19] historically that have been in place for [16:21] thousands of years. The Romans were [16:23] great road [clears throat] builders and [16:25] a lot of their roads are still in use [16:27] today obviously with repavement and [16:30] other things. So, um just wanting to [16:32] give you that context uh from a a land [16:34] use standpoint and from a a [16:37] transportation master plan perspective. [16:40] This is where we're headed with these [16:42] things and um so to turn it back over to [16:45] you. [16:45] >> Perfect. Thank you. [clears throat] [16:48] » Okay. Um, [16:53] this next tab, I'm going to breeze over [16:55] these next three because they're um [16:58] relatively [17:00] um they're important but not as [17:02] important for tonight's discussion. [17:05] Let's see if I can get it to load. [17:15] Okay. So, this next uh page that you see [17:18] on the website is the roadway surface [17:20] type map. So, we have asphalt, gravel, [17:23] and dirt. This is how your UD do funds [17:25] are allocated to the city for your uh SE [17:29] road funding. So, your pave roads get a [17:32] certain amount of money, your gravel [17:33] roads get a certain amount of money, and [17:35] then your dirt roads get a certain [17:37] amount of money. We have pro provided [17:39] the city with an update. So they can [17:41] send that to UD do and get the most [17:43] money they can get based on the current [17:46] road mileage within the city. [17:51] This next map is a average [17:54] [clears throat] daily traffic map. So [17:56] each of these blue dots that you see on [17:58] the screen you can click on. This is [18:00] where we put a traffic counter down with [18:02] those two tubes that go across the [18:04] roads. Um so the ADT is the average [18:08] daily traffic. The AD weekday is the [18:11] average daily traffic on the weekday. [18:14] Um, then you can scroll down to the [18:17] bottom [18:20] and you can see [18:23] all of your percentages of the types of [18:26] vehicles that you're seeing on that [18:27] road. So, for example, this passenger [18:31] vehicle, you have 91% of those are [18:34] passenger vehicles on that road. Um and [18:38] then your heavy trucks um down here are [18:43] 3% of that total. [18:46] So for each of those points, you can [18:49] click on those. You can see the same [18:52] data for those. And this [clears throat] [18:54] is how we calibrated the model. So UD do [18:57] has a regionwide model and we use this [19:00] data to calibrate the model itself. So [19:02] we make sure we have current data as a [19:06] base point to start with the modeling [19:08] piece. [19:10] >> Can you go back to that? I'm sorry. Now [19:13] I see the [clears throat] the legend [19:15] there. Just kind of clear off those two. [19:18] See that? [19:19] >> Yeah. [19:21] >> Straighten your [19:22] >> Yeah. [19:23] >> So main is obviously the heaviest [19:24] travel. So you're not showing sheep. [19:29] That's not [19:32] >> I think it's the red one. [19:33] >> Yeah, that's the red one. [19:35] >> Which one was that? [19:36] >> She blamed [19:37] >> Oh, [19:39] that one has 6700 vehicles on it during [19:42] the weekday and just just over 5,000 [19:47] average. [19:51] What is Main Street [19:54] >> on the We didn't do Main Street on the U [19:57] dot right away because you're not over [19:59] that. But on the west side, [20:02] >> you are 2000. [20:03] >> Yeah. [20:06] » And you can click on each of these [20:08] points to see. [20:09] >> Is that Dery? The one that's [20:12] >> Yeah. Dery Street. So Dery [20:15] East is the uh as the point. [20:19] Oh, on this one. [20:20] >> Yeah, [20:22] >> this this [clears throat] [20:24] question may come. You might be able to [20:25] say just you're gonna answer it later, [20:27] but yeah, as you look at this and your [20:28] projections of what it's going to look [20:29] like in the future, are you also giving [20:31] recommendations on how the road should [20:33] be constructed looking forward because [20:35] obviously truck traffic is going to [20:36] impact a road more, heavy traffic is [20:38] going to impact the road more. [20:39] >> Oh, you're talking like thicknesses, [20:41] [clears throat] [20:41] >> just how you build the road. So, if [20:42] you're if you have more semi-tra, that's [20:44] what tears up roads, not cars. [20:46] >> Yeah. And so I'm just wondering if [20:47] that's going to be part of the projected [20:48] plan. So is the city's planning for, [20:50] hey, this road going to get higher use [20:51] and it's going to increase on heavy [20:53] truck traffic, but we need to make sure [20:55] it's built to the correct standards. We [20:58] need to redo it. [20:58] >> We don't specifically look at that. Um, [21:01] we do look at the pavement condition and [21:04] give you a treatment type to fix it. Um, [21:07] but as far as the design of the road [21:09] goes, that's that'll come when the [21:11] design actually happens. When we do the [21:15] pavement treatment type, we're [21:16] estimating based on [21:19] typical practice. So like if we do an [21:21] overlay, we put 2 in on typically to [21:24] help with the structure. But as far as [21:26] the crosssections go, that's something [21:28] that we talked about in our last [21:30] meeting. Typically there's an ongoing um [21:34] project after this to update those [21:36] standards for the crosssections itself. [21:39] >> Okay. Just out of curiosity, does [21:42] anybody from the city happen to know [21:44] that the traffic counts for Main Street? [21:47] >> Yeah, if you give me [21:49] >> Okay. I just was cur I'm just curious. [21:51] [clears throat] [21:52] >> Okay. [21:52] >> I can pull that up. [21:54] >> This might be old, but like 18,000 cards [21:57] per day. [21:58] >> 18,000. Okay. [22:00] >> Might be a little bit outdated, [22:02] >> but it's at least that. [22:04] >> And I would guess Mormon Trail and Maine [22:06] are the heaviest truck in the country. [22:09] I would think so. [22:14] » I don't know. The truck traffic would be [22:16] pretty intense on Sheep Lane as well. I [22:18] would [22:18] >> I would think [22:24] maybe [22:39] It's going to take a minute to load. [22:49] So, the last count on the east side was [22:51] 11,000. [22:53] A lot of times we find these counts are [22:55] not that accurate. [22:59] » Yeah, 11,000 is what it's showing. [23:04] You know when they did those counts? [23:06] >> Um, [23:11] this one's saying 2024. [23:14] >> I'm just seeing they're different on the [23:16] east side. [23:19] » The same line. [23:24] » Yeah, the east side see lower than that. [23:26] >> Yeah, this is not right. Yeah. [23:29] >> So, the problem with some of you do's [23:31] data is the KMZ file they use sometimes [23:36] doesn't get updated clearly. [23:38] >> So, I cuz if if she plans getting 6,000, [23:41] that highway is probably getting at [23:43] least 12, I would think. [23:45] >> Um, [23:49] » yeah, [23:49] >> thank you. [23:50] >> So, there's a there's a gap there. This [23:52] says 6,000 right there, and this says [23:56] 12. [23:57] So, [24:00] okay. [24:05] This one I'll breeze over. This is [24:08] a heat map for Grantsville. This takes [24:10] all the state crash data and puts it [24:12] into hotspots. So, for the city, you can [24:15] take this, you can zoom in [24:21] and see all the hot spots within the [24:23] city. Of course, 90% of your crashes are [24:27] going to probably be on the the main [24:29] street, but you can see all the smaller [24:31] crashes or smaller heat marks around the [24:35] city as well. There's maybe a bad [24:38] intersection there at Dery Street. Um, [24:41] >> we have picked these and we didn't need [24:43] you to tell us. [laughter] [24:45] >> Probably high school's probably high. [24:48] Yep. So, you can see all the little hot [24:50] spots um throughout the city. Um, I will [24:54] say these are only reported crashes. So [24:56] if they're not reported to the state, [24:58] they're not part of this data. [25:03] Um, this is your active transportation [25:04] map. All we did simply on this one is we [25:07] took your current active transportation [25:09] plan that you have and put it on the [25:12] website. So we had no part in [25:15] determining where these trails go. [25:21] Um, truck routes. Uh, this is a truck [25:23] route map. Um, I will say we are going [25:26] to add the depot road on the south end [25:28] of the city on this. Um, but this is [25:31] what we've came up with for a truck [25:33] route map. Does anybody have any [25:35] comments or concerns about this one? [25:39] Um, I would think that Burmeister would [25:42] maybe be on included in that, but maybe [25:45] I mean I didn't look closely at what you [25:47] showed as truck traffic on Burmeister, [25:49] but [25:49] >> it was about three. The hard part with [25:51] Burmeister right now is [25:53] >> that turn to get out of the city. [25:56] >> Um, once that's fixed, it's going to go [25:59] up. [26:00] >> Um, [26:00] >> or if that ever gets fixed, [26:03] >> I should say. [26:04] >> We as staff requested to pull Burmeister [26:06] off because of that turn. [26:07] >> Okay. Um, so I mean from [26:09] >> So you don't want it listed as truck [26:10] traffic. Got it. [26:11] >> So I mean [26:12] >> from Industrial [26:15] Parkway north, new truck traffic, but we [26:18] don't want them coming south [26:19] >> into town that direction. [26:21] >> That way. [26:21] >> Okay. [26:22] >> Um, but one road that we did want to add [26:24] is that North Army Depot road. [26:28] >> Yeah. [26:29] >> This one, right? [26:30] >> Yeah. Okay. [26:35] » Okay. Um, [26:37] Let me show you this really quick. [26:42] So part of the study was also looking at [26:45] current conditions of the streets within [26:49] Grantsville City. Um [26:53] so we partnered with a company called [26:55] Violytics. They're an AI company based [26:58] out of Germany. They're backed by [27:00] Volkswagen. That's where their startup [27:02] money came from. Um, but what we do is [27:06] we mount a a phone in the windshield of [27:08] a car. Um, and it takes a picture every [27:11] 10 ft. And what it's doing as it's going [27:14] down the road, it's picking up every [27:16] crack and every pothole, every different [27:20] type of distress within that picture. [27:23] And every picture gets rated and then [27:26] those pictures combine into a segment. [27:28] And each segment gets a segment score. [27:31] [clears throat] [27:32] So what I'm showing you today is not me [27:34] telling you this is what condition your [27:36] roads are in. This is an unbiased [27:39] opinion on the condition of the roads [27:41] within Gransville. [27:44] So based on that assessment that we did, [27:56] these are the conditions of your oats. [27:59] So the more blue it is, the better it [28:01] is. Then it goes to green, then it goes [28:03] to more like a yellowish, then a orange, [28:06] and then a red. So your roads are [28:09] actually in pretty pretty decent shape. [28:13] Um, [28:14] I'm going to pull up the app [28:20] so we can zoom in on these a little [28:22] better. [28:31] So this app the city staff has access to [28:34] as well. We just onboarded the city to [28:37] be able to use the system in house as [28:39] well. Um but each one of these streets [28:42] has a condition to it. Um city staff has [28:46] access to all the image data that was [28:50] collected as well. So, they can come in [28:52] here [28:57] and you can drive down the street just [28:58] like you would Google Earth um with an [29:02] updated image. City staff also has um [29:06] all of the manholes, all the signs [29:09] within the city. So, I'll turn those on. [29:15] They have all the signage. We have all [29:17] of the different issues with signs. So, [29:21] for example, I can filter out hidden [29:23] signs and click on that. It will show me [29:25] a picture and show trees in front of [29:27] those um signs. So, I can go trim trees [29:29] and stuff like that as well. [29:32] Um this is all automated simply by just [29:35] driving the road and uploading images [29:38] and then it pops out into this system. [29:43] So, we took this data and we said, [29:46] "Okay, what is it going to take to get [29:50] the roads to stay in good condition [29:52] first and then fix the ones that are in [29:54] poor condition?" [30:01] So, you can see on the map here the [30:04] different treatment types. Um, there's a [30:07] lot of different treatment types here. [30:09] So, there's a lot of different colors. [30:11] Um, but there's mill and fill and [30:14] overlay. Those are roads that [30:16] [clears throat] are in fair condition [30:17] that just need a rehab to them. Um, [30:20] crack seal. Um, those are roads that are [30:22] in good condition. We just want to make [30:24] sure we seal those cracks off from uh [30:27] allowing water to penetrate into the [30:29] base. Um, crack seal and chip seal. [30:32] those those are roads that are in good [30:34] condition but have their existing [30:36] surface asphalt surface exposed because [30:40] we don't want the sun to bake the [30:41] asphalt out of the asphalt mix. Um the [30:46] red roads are those that are in the [30:49] worst shape and need the most help. Um [30:53] so we're recommending those to be fully [30:55] reconstructed [30:57] um to mitigate for all the cracking [31:00] within those streets. [31:02] So for example, anybody want to look at [31:05] a certain road. [31:09] » It can be the one you live on if you [31:11] want. [31:13] >> This is unbiased. So [31:14] >> willow street. [31:15] >> Okay. You got to guide me there. [31:18] >> Right. [31:19] >> Yep. [31:20] >> Right. Okay. doing stuff. [31:27] » So you can see [31:29] >> right there. [31:30] >> This one. [31:31] >> Mhm. [31:39] » So the city staff can come in. They and [31:42] we can give access to really anybody. [31:44] It's just depending on who you want to [31:47] see this data. Um, we can go drive the [31:51] road and see. [31:53] >> This is only a couple weeks old, if [31:54] that. [31:55] >> Yeah, [31:58] a couple days. [32:00] >> So, you can see the patching, some of [32:02] the patching that's gone on. Um, there's [32:05] some potholes cracking. You can zoom in [32:07] and see [32:11] um some of the longitudinal. Looks like [32:13] there was a trench cut. Um and then you [32:17] can go in and see all of the manholes [32:20] itself on that [snorts] road and it will [32:23] tell you if those manholes are low, even [32:26] or too high. Um so those can go be fixed [32:30] as well. [32:32] Um so this this data is on the on the [32:36] transportation plan simply more for [32:39] information for the public to say okay [32:42] these are the current conditions of the [32:44] roads. the this is our plan to fix the [32:46] roads. Um the hard part is convincing [32:50] the public that you should keep your [32:52] good roads in good condition and fix the [32:56] bad roads when you get funding for that. [33:01] » Yeah. [33:02] >> Did uh the [33:05] overlay get out to um highway 112 and [33:10] shoot plane [33:13] >> uh this one. Yeah. The one. Yeah. One [33:15] east. That's one east southeast. [33:19] >> Yeah. [33:19] Okay. [33:21] >> That y [33:22] >> Yeah. Thank you. [33:27] » Okay. [33:29] [snorts] [33:30] This is where we get into um the phasing [33:34] of the roads in order to take care of [33:36] the traffic that's coming to Gransville [33:38] as growth happens. So, we've got three [33:42] phases that we split this into. So, [33:45] phase one, um well, actually, let me let [33:48] me show you this first. [33:56] So, the right hand side is if we do [33:57] nothing. The left hand side is if we do [34:00] something. [34:02] So, the right hand side shows if we [34:05] don't do anything in by 2035. [34:09] This is the condition of or the traffic [34:11] condition within Grantsville. So the red [34:14] means bad, yellow means moderate, green [34:16] means good. So if we do nothing and let [34:19] the city grow, these roads are going to [34:22] be failing, meaning you're going to have [34:23] bumperto-bumper traffic in those [34:25] sections of road um at that year. If we [34:31] add certain roads, which I'll show you [34:32] here in a second, if we build the roads [34:35] that we're proposing to be put in, then [34:38] this is the condition of those roads on [34:40] the left hand side. [34:45] 2042, [34:48] same thing. If we do nothing on the [34:51] right hand side, this is what the [34:52] condition of those roads are going to be [34:54] as far as traffic goes. You can see some [34:56] of these start to downgrade. But if we [34:59] add the roads that we're proposing in on [35:01] the left hand side, this is the [35:03] condition that you're in. And same thing [35:05] for the next one, 2050. And I could [35:08] probably just skip to 2050 on most of [35:10] these. Um, [35:13] if we did nothing, basically all of the [35:16] roads are failing that are high traffic [35:19] roads. And then if we add the roads [35:22] around the city and through the city, [35:24] we're looking like we're in pretty good [35:27] shape except for one piece of Main [35:29] Street. Um, which technically would have [35:33] to go to seven lanes in order in order [35:35] to fix that, which is going to be very [35:37] hard because you have buildings on both [35:39] sides. [35:40] >> So what's a fail? What color is fail? [35:42] >> Failing is red. [35:45] Dark red. [35:46] >> Hi. Could I make a comment and and I [35:48] have ask you a question? [35:50] >> Yeah. [35:50] >> So many of the roads directly north of [35:53] Grantsville that you have proposed there [35:56] are not in Grantsville city limits. Are [35:58] those plan county roads? Have you I mean [36:01] you said you worked on the county plan. [36:03] >> Yeah. [36:04] >> So I mean those are within our annexed [36:06] boundary. Yes. [36:07] >> We have not annexed officially that land [36:10] into the city yet. So, and that is [36:12] >> I guess my question is I mean that's all [36:15] fine and dandy, but um that's not part [36:18] of the city. [36:18] >> Correct. Currently, they're not [36:20] currently. [36:20] >> Yes. Well, we're looking in the future. [36:22] So, [36:23] >> I I see that. [36:23] >> Let's say let's we're anticipating that [36:27] annexation happening so that when it [36:29] happens that you've planned for the [36:32] traffic demand within the city or so. [36:36] Okay. The other thing to note is 90% of [36:41] these roads are only going to be built [36:44] by developers, which I'll get into here [36:46] in a minute as well. Um, some of these [36:50] roads are going to be city roads, but [36:52] the majority of them will be development [36:54] driven. So, if developers don't develop [36:56] or annex to develop within Grantsville [36:59] City, a lot of these roads won't happen, [37:02] nor will there need to be if the city [37:05] doesn't grow. But this [37:07] The anticipation is there will be growth [37:09] within the city or annexed and then [37:13] growth within the city that way. [37:18] » What's the typical life of a new [37:21] subdivision? [37:22] >> So you design it for 20 years. Um but [37:25] then you have to maintain it. So if you [37:28] maintain it, it can last forever. If you [37:31] don't maintain it, it'll go to gravel [37:33] again. [37:34] But [37:35] >> 20 years is [37:36] If you did nothing, 20 years is is where [37:39] you'd be. Yeah. [37:43] So, [clears throat] this tip list is [37:44] your transportation improvement plan. [37:47] So, the level of service over here looks [37:50] at the congestion within the city. The [37:53] transportation improvement plan is the [37:55] roads that need to go in to fix the [37:57] issues with congestion within within the [38:00] city. So this coincides with what needs [38:02] to happen by 2035 with the growth [38:06] projections that are that are [38:07] anticipated between now and 2035. [38:10] So all the roads shown in yellow and red [38:13] are those um [38:17] roads that need to go in in order to [38:19] provide adequate uh transportation [38:22] access through the city. Um a lot of [38:26] these Oh, come on. [38:30] A lot of these are going to be developer [38:33] related. For example, this these outer [38:36] roads are all development driven. [38:39] This northern piece is development [38:41] driven. This uh this red road is [38:44] development driven. These yellow roads [38:47] are all road widening. So, a lot of [38:49] these are UD do. So, this one's UD do. [38:52] Um this one's U DOT. This might be a [38:55] combination of uh city and county um and [39:00] then some city widenings as well as well [39:03] as county improvements too. [39:06] >> How much of that loop is actually [39:09] existing right now? [39:10] >> Uh which one? This [39:12] >> the red loop basically. [39:15] >> None of that. Yeah. [clears throat] [39:19] >> What is that yellow line? Is that south? [39:23] There's a portion of it that's existing. [39:24] Part of it's not Green Street. [39:26] >> Yes. [39:27] there is a portion right in there. [39:29] Yeah. [39:30] >> Starting here, it's non-existent. [39:33] >> Well, even even there, right there, that [39:36] cross-section where your cursor just [39:38] was, all that to the [39:40] >> east [39:40] >> to the east is all not non-existent as [39:43] well. [39:43] >> Willow Street. [39:44] >> Yeah. [39:44] >> Till you get to Willow. Yeah. [laughter] [39:50] But this western piece, nothing's in [39:52] that. [clears throat] [39:56] So if we same thing on the next one, [39:59] this is phase two going to 204 2042. [40:06] So these are the roads. The black roads [40:08] are the roads we just looked at. So the [40:10] 2035 roads, 2042 roads are the ones in [40:14] yellow and red. So, this little piece um [40:18] just off of Maine would need to be [40:20] widened by UDOT. And then the red roads [40:24] would need to go in for adequate flow [40:26] through the city. [40:29] >> And that that red road at the bottom, [40:32] >> that's the depot road, correct? Okay. [40:34] >> Correct. Yep. [40:39] And the last one, this is that full [40:42] buildout, of course. [40:44] >> [clears throat] [40:46] >> Basically, the rest of those collector [40:49] roads that we that are needed are shown [40:51] here. The black roads are the ones that [40:54] are in 2042 and 2035. [40:59] If you click on each of these, which is [41:02] this is a good segue into our next [41:05] discussion. [41:08] If you click on each of these, these [41:11] this is the number of lanes that are [41:13] needed for the model to or for the [41:16] traffic to flow through the city. So a [41:18] three lane section is one lane in each [41:21] direction with a center turn lane. Two [41:23] lanes is one lane in each direction. [41:26] Five lanes is two lanes in both [41:29] directions and one center turn lane. So [41:31] if you click on each of these, you can [41:34] click on them and see [41:36] [clears throat] the total number of [41:38] lanes required for the traffic to flow [41:40] through the city. Um [41:44] so the bulk of the discussion tonight, [41:47] I'm going to bring up three specific [41:50] locations that we need to talk about. [41:59] So down here on the west side [42:03] you have a heavy um density or we have a [42:08] heavy density of arterial roads which [42:12] are 108 ft wide um in this area. Based [42:17] on the modeling we did, most of the [42:20] roads in the city, basically all of the [42:22] city roads only need to be three lanes [42:25] or less. Um, [42:28] these green lines that we're showing are [42:30] five lanes. Um, so my recommendation or [42:35] the discussion tonight [clears throat] [42:37] we need to discuss is do you want to [42:40] continue to see all of these be five [42:43] lane roads or do you anticipate or would [42:46] you like to look at some of those being [42:49] reduced to maybe a threelane corridor or [42:51] a two-lane corridor? Um, so [42:54] specifically, uh, Shelby, do you [42:58] remember did we we discussed this one [43:00] staying or was it this one? [43:02] >> Um, so Matt Canyon needs to stay Main [43:05] Street, um, which is that one is one [43:07] that, [43:09] um, is variable, but you're never it's [43:13] going to be difficult to get the [43:14] rightway back. [43:15] >> Yes. Because it's already shrunk down to [43:17] two lanes in some areas, right? [43:19] >> So maybe the road doesn't need to be [43:20] built out to a five or seven lane road. [43:23] But if we have that right away, we can [43:25] always build wider [43:28] >> later on. [43:29] >> right? [43:31] >> And so that's why staff recommended to [43:34] keep those um arterial or larger rideway [43:38] widths. So in the event with the [43:41] anticipated development going up there, [43:43] we have the rightway widths. [43:48] It's a purchase of private property back [43:51] eminent domain to do the law of that [43:53] >> eminent domain and I mean structures [43:55] there then you're needing to tear down [43:58] structures or things like that. [44:05] » So specifically so this one has to stay [44:08] this green [44:09] >> the M canyon. Yeah, I would say so. [44:12] >> Main Street, there's portions of that neck down to 80 ft and then back up [44:16] to 108 ft. So, there's sections of this [44:19] one that kind of skinny up. Um, [44:24] there's also [44:26] a depot road that kind of loops all the [44:28] way around. These two are a little bit [44:31] close together [clears throat] to be [44:33] both minor arterials. Um [44:39] so it's really up to up for discussion [44:43] on [44:45] do you keep this high density of [44:47] arterials in this area. Um the only the [44:51] only thing that I would [44:54] um [44:56] you have to be careful with requiring [44:59] too much right away on every street um [45:04] because the modeling doesn't give you [45:06] justification necessarily to have that [45:09] wide of a rideway. Um [45:14] it doesn't hurt to get wider rightways. [45:17] Um, but there's there's a [45:22] chance that you could a developer could [45:27] come to you and say, "Hey, you required [45:29] too much right away. You should you got [45:31] to give it back to me or pay me for it." [45:34] Um, so that's a discussion for the [45:36] council and planning commission to have [45:39] tonight. [45:40] And I don't know is your is your city [45:42] attorney that Yeah. Is that you? Um is [45:46] that the case? [45:48] >> Yeah. So if we require larger ride [45:50] ofways than then is necessary that would [45:52] be considered a taking and we would need [45:54] to compensate the developer for the [45:57] required up size that we'd be looking [45:59] for for a ride ofway. [46:00] >> Right? So that's just one thing to [46:03] consider tonight as we go. There's [46:06] really three areas. There's this one and [46:09] two others that I want to look at [46:10] tonight. Um, with that, [46:14] >> what's the minimum width of any of these [46:16] roads? [46:17] >> I think your smallest right away is 80. [46:20] >> No, our smallest right away is 66. [46:22] >> 66. [46:23] >> Our max is [46:27] » Yeah, I have some typical sections that [46:29] we have drafted. Um, [46:35] yeah. So, this is your 66 foot rideway. [46:38] This is what it looks like. [46:42] This is your 90 foot. So this is what [46:46] your collector streets would look like. [46:48] And then this is what the arterial looks [46:51] like. So you have five lanes at full [46:54] buildout [46:56] with parking. [47:00] » What's the width of this one more time? [47:02] >> Uh this is 108 ft. [47:04] >> That what about was the 60? [47:06] >> Oh, this one's 90. And then [47:10] uh [47:12] 66. [47:13] >> This one only 66. [47:23] » You said that 108 was it five lane? But [47:26] [clears throat] [47:27] >> yes. So this picture is a little bit [47:30] confusing because we cut it in half. [47:32] >> Okay. So on the left hand side you're [47:35] going to see if they don't build the [47:37] full rideway all the way out. The right [47:39] hand side is if they build it all the [47:41] way out. So if they were to build both [47:43] sides it would be mirrored [47:46] >> on that side. [47:48] >> Yep. [47:52] Um, [47:58] » and have you I guess ran this or [48:01] coordinated who want to coordinate with [48:03] you? [48:04] >> Yes. [48:04] >> Have you coordinated with them? Yeah. [48:06] >> In regards to this, I guess the one [48:07] question I would bring up is in [48:09] coordinating with this like [48:12] >> we have the Mid Valley Highway and then [48:13] the other highways, are they actually [48:15] talking possibly a freeway that could [48:17] loop around all the way down? I don't [48:18] know. Beat us. [48:20] >> I don't think that's part of that. [48:22] >> That's not part of their plan currently. [48:25] Um [48:27] >> that I'm aware of. We have the mid [48:30] valley. [48:32] >> This one [48:35] >> and talking with Travis Heron dot and [48:37] working with Jeff debate that has been a [48:39] discussion for Grantville itself. [48:42] Quilla, yes, but not Grantsville on Mid [48:45] Valley Highway in the long future may [48:49] turn into a freeway, but they're not [48:51] anticipating that Grantsville will need [48:52] a freeway. [49:01] So, jumping back to this. [49:04] Um, [49:09] there are [49:10] I mean, [49:12] >> can you go back to that purple line that [49:14] you were just barely on uh to your left? [49:18] >> This one [49:18] >> the dashed. Yes. [49:19] >> Yeah. So, [49:21] do we have homes in this area already [49:24] that are [49:27] not in [49:30] >> Is that Walmart there? That [49:31] >> Yes, that's Walmart. So, are there homes [49:33] anywhere in that purple? [49:35] >> No, there's like two homes to the east [49:38] of it, but this is part of Sean [49:39] Johnson's development. [49:40] >> Okay. I'm talking more further um [49:43] further south, like nowhere in there. [49:45] Highlands, [49:47] >> a bunch of town homes in there. Uh about [49:49] where the green is, I think. Green and [49:51] yellow, aren't there a bunch of top [49:52] >> in here? [49:53] >> No, there's not. [49:54] >> There's still piece of that yellow green [49:55] line. [49:56] >> Okay. So, nothing in in this area is [49:58] built out. Northstar or Northstar Ranch. [50:01] None of that is in here. Okay. [50:03] >> I mean, it'll be a part of it, but [50:04] >> Right. But not yet. [50:06] >> This little grade out area, you can see [50:08] this is your annex limits currently. [50:11] >> Okay. [50:11] >> So, that's where your city limits are [50:13] right now. [50:14] >> So, the towns are back down on the [50:15] highway. That's Yeah, I mean Sun is [50:17] right there, but you're still not that [50:19] far out. Northstar Ranch is south of [50:21] there, but you're still [50:22] >> still even inside that yellow line right [50:24] there. [50:25] >> Yeah, they're one way. [50:32] » I guess that gives us a little [50:33] perspective of how far up the bench [50:35] these three [50:37] roads will be. I guess [clears throat] [50:43] » originally [50:45] um [50:46] there's a couple options. We can leave [50:48] it the way it is. Um [50:52] knowing that the lane configuration is [50:55] larger than what's needed. Um but there [50:59] is that legal risk involved with that. [51:03] Um, [51:04] we can make a few changes to this. We [51:08] talked about a few today in our meeting. [51:11] Um, [51:14] we can change some of these uh colors so [51:17] that they're more in line with the lane [51:19] configurations that are in the model [51:21] that we got. Um, [51:27] I guess those are the only two options [51:28] there. basically switch the lane [51:30] configuration to match up with the model [51:32] itself with a skinnier rideway or leave [51:36] it get a bigger ride ofway and only [51:38] build the lane configuration that you [51:41] need. [51:43] That's always my recommendation is to [51:45] get more of the rightway width. Now, [51:48] even if you don't build out the full uh [51:52] asphalt cross-section [clears throat] [51:54] because in in 50 years or 100 years when [51:57] you need the rightway, it's there and [51:59] available. Not dissimilar to how our our [52:02] current main street is right now. We [52:04] have plenty of width right now to go out [52:06] to five lanes if we needed to and if [52:08] that day ever came. Um that's because [52:11] our our forefathers had the the [52:13] foresight to look at that and say this [52:15] is going to be the main street. Let's [52:17] make sure it's wide enough. So uh it can [52:21] accommodate future growth. That's really [52:23] what we're being tasked with [52:25] anticipating right now. [52:31] » Who maintains that no man's land in the [52:34] meantime? I guess [52:36] >> the city. Yeah, it doesn't probably get [52:39] anything [clears throat] doesn't look [52:41] pretty very good. I can see the [52:44] future [52:47] bearing, but also [52:49] non-maintenance of all that rail that we [52:51] ever use. [52:53] >> And then your setbacks are off that [52:55] wider rideway as well. So your houses [52:58] are set back [53:01] 30 ft from that 108t rideway line. [53:05] Well, you're you're North Depot Road and [53:08] you come on that southwest quadrant. How [53:10] what is your elevation gain to get up on [53:11] that? [53:13] It's [53:13] >> And is there any talk for the council to [53:15] annex that part of the [53:18] >> county in [53:21] our plan just approved it few weeks ago. [53:26] So, we can't just go and annex land into [53:30] requested has to be requested. So, [53:32] >> well, just like with any any [53:34] infrastructure project, if there are uh [53:37] concerns like that, they'll have to be [53:39] worked around and dealt with. These lines aren't necessarily intended [53:42] to be survey level accurate, per se. [53:45] They're intended to be guidelines as [53:47] development happens in the area. Um, [53:50] this is the ask is that we anticipate [53:54] >> the need for these kinds of circulatory [53:57] roadways. [53:58] And if again, if we don't ask for it [54:01] now, we can't ask for it later. [54:03] >> Keep it wide. [54:04] >> Yeah, I think we keep it wide. I mean, [54:06] Sean Johnson's deal is going to be the [54:08] same size as Grantsville. We only have [54:10] one road pretty much that width, Main [54:12] Street, maybe Dery in some spots or [54:14] Clark, but I mean, we've seen how busy [54:17] that is already. So, I think we keep it [54:20] wide, especially on that West bench. [54:22] >> Absolutely. give them to north south, [54:26] you know, wide roads to use. [54:29] >> Sounds great. [54:31] >> Have you ever had a city say wish we had [54:32] smaller roads? [54:34] >> I doubt [laughter] [54:36] >> the road crew does. [54:38] >> Yeah. [54:40] I'd like you to go, if you would please, [54:42] to the 33rd Parkway, which I don't know [54:44] if you're familiar with. [54:45] >> Yes, that is my next area that I wanted [54:48] to look at. [54:49] >> Thank you. [clears throat] Um, this is [54:51] one that we've had countless discussions [54:56] on between Shelby, myself, and other [55:01] staff. Um, [55:03] so this alignment from Mid Valley [55:06] Highway to about [55:10] >> the triangle [55:11] >> probably [55:13] >> honestly probably to here because we're [55:15] vested, right? [55:17] >> Yeah. So I mean in the for Lake View [55:19] business Business Park in the master [55:20] development agreement, it's showing and [55:22] outlines that Mid Valley Highway or 33rd [55:26] Parkway will run to the north of them. [55:29] But the county right now um has right [55:32] away obtained where that triangle [55:35] spot is [55:38] to the east [55:39] >> where it says Lake View. [55:41] >> Yeah. [55:43] No, [55:43] >> this one [55:45] >> up a little bit. [55:47] >> The triangle right here. [55:49] >> That's the rail track. [55:50] >> They have it up. [55:51] >> This is where they have the right [55:53] >> that's where their rightway that they've [55:55] purchased ends. Correct. Okay. [55:58] >> And then Huntsman's, that's this piece. [56:01] Um [56:02] >> Romney's [56:03] >> Rom Romney's sorry. Romney's group from [56:07] here to here is I don't know where [56:10] property lands are exactly. All right. [56:12] >> Um [56:13] >> to the west. [56:14] >> Is it somewhere in there? [56:17] >> There. Yeah. [56:19] >> Um so there their group basically [56:23] um talking to Shelby. It is vested with [56:27] the road being on the north side. Mhm. [56:30] >> There is [56:32] I would like to see this connecting to [56:36] only because can actually go all [56:40] the way through. [56:41] Um whereas uh Dery Street [56:46] >> gets cut off. [56:48] But [56:51] there are well the other issue with Dery [56:55] Street is aligning these two [56:57] intersections is going to prove [56:59] difficult as far as a design goes. [57:02] >> We had it we had it lined up before and [57:04] we changed it. [57:07] >> So [57:08] >> Oh, you had it you had [57:09] >> Yeah, we had it like that and Udoth [57:11] wanted a perpendicular [57:13] >> intersection right there. So that's why [57:15] it goes up. That's [57:16] >> why it got changed. Yep. [57:20] >> Um, so to line those two up, it's [57:23] possible, but there's some [57:25] >> property is still there. It's just it's [57:27] just sitting there. [57:28] >> Yeah. [57:28] >> To make those line up as you're [57:30] discussing, [57:31] >> but to make them a 90 degree [57:33] intersection, [57:34] >> that's going to be impossible. [57:35] >> That's going to be hard. [57:36] >> Yeah. [57:37] >> Which is what you do will most likely [57:39] require. [57:42] Something we discussed in the meeting [57:44] today was potentially coming [57:48] once you get to this point coming down [57:51] crossing over following this dirt road [57:54] and possibly connecting in here with [57:57] 33rd. [57:59] Um or we can keep it on dury and [58:04] somehow figure out that intersection. [58:06] Um, [58:09] those are really the two options that I [58:11] wanted to talk about. [58:12] >> I I was I guess I'm confused. I thought [58:15] that [58:16] I understood that the Romney wouldn't [58:18] allow 33rd Parkway to go through the [58:21] Lake View Business Park, but we have the [58:23] ability to take it. It's on the north [58:26] you said of [58:28] >> so in the master development agreement [58:30] for Lake View business park their [58:33] exhibits should 33rd Parkway and they [58:36] reference that they get eight [58:38] connections to 33rd Parkway to the north [58:40] of their development. [58:44] » So it needs to be reviewed and [58:46] determined does 33rd Parkway go through? [58:49] Is that what we want 33rd Parkway or do [58:52] we want it to drop down to Green? We [58:54] want it to connect into [58:57] uh what is that? Keeps [58:58] >> one of the biggest problems that you [59:00] have though is crossing the tracks there [59:02] and the tracks why right there at that [59:05] triangle and it circles there are at [59:08] least according to their plan. And so [59:10] you're'll be crossing the tracks like [59:11] three times right there [59:14] or at least twice [59:15] >> within a small window. [59:18] >> They don't want to miss that. [59:20] >> Are they going to bring it down this [59:21] way? It's going to kind of circle. [59:24] >> Yeah. [59:25] >> So, we're going to cross it here. And [59:26] then again, [59:27] >> I think you'll have to show him on the [59:28] map because it kind of [59:31] >> Shelby can get you their proposed plans [59:33] on where they're putting their rail. [59:35] [clears throat] [59:39] » This is a critical one. [59:41] >> It is. It is critical [59:43] >> because [snorts] part of this level of [59:45] service map that we show here [59:57] This is your current level of service [59:59] map. [1:00:01] You can already see Highway 112's [1:00:04] failing. Um, and east side of Main [1:00:07] Street's already failing. Currently, [1:00:11] we don't add in that east west [1:00:14] connection. That's only going to get [1:00:16] worse. [1:00:27] So you can see we have it. We have that [1:00:30] 33rd Parkway coming in and that's what [1:00:33] helps that highway one the highway 138. [1:00:38] It helps decrease the traffic on that. [1:00:43] But you're only crossing the rail twice. [1:00:47] So where the little triangle rail area [1:00:51] is, you're only crossing [clears throat] [1:00:52] that portion of the rail. And then as [1:00:54] long as you stay to the north of it, you [1:00:56] don't cross it again. [1:01:01] » So you're talking. [1:01:02] >> So keep [1:01:12] Yeah. So you would cross twice here and [1:01:15] you can either come down and have it [1:01:18] connect into here or we continue it and [1:01:20] figure out going down there. But the [1:01:24] rail splits here. So one two cross. [1:01:26] >> So cross cross [1:01:29] >> there [1:01:32] at grade for now and then eventually [1:01:34] it's going to be a bridge. You can [1:01:36] either come down here and connect [1:01:38] through or stay there. [1:01:45] » From your from your experience, you [1:01:47] talked about whether to go to Niger [1:01:49] Street and I [1:01:51] >> you got a little push for right for [1:01:53] right angle intersections. Yeah. [1:01:54] >> The cost to to re-engineer what we do [1:01:56] there or taking property sounds like [1:01:58] it'd be more complicated than trying to [1:01:59] connect to N green. Is that what I'm [1:02:01] about to say or [1:02:02] >> I mean you can do it with the right [1:02:04] amount of money, right? Like [1:02:06] >> costwise it'd be more cost effective to [1:02:08] tie connect this to my network. [1:02:10] >> Not necessarily cost effective. I'm more [1:02:12] looking at it from a a grid network. So [1:02:15] like [1:02:17] instead if you connect in here, you're [1:02:20] [clears throat] sending everybody down [1:02:21] to this point and it's stopping. [1:02:25] Whereas if you send [clears throat] [1:02:27] people to here, they can go all the way [1:02:31] around the city and literally loop the [1:02:35] whole city itself on that one road. [1:02:40] >> If it was up to you, what would you [1:02:41] pick? I'm curious. From a consultant [1:02:42] perspective, [1:02:43] >> I mean, from a from a traffic modeling [1:02:45] perspective, the the Nag Green makes [1:02:49] more sense, but [1:02:52] there's politics involved as well. [1:02:54] [laughter] [1:02:55] So yes, Jason, you're correct. [1:02:57] >> The other thing about Derky Street is [1:03:00] that we have a bunch of existing [1:03:02] residents, right? Where you get to night [1:03:03] green, there are some but a lot less and [1:03:06] it's more open country. So you can yeah [1:03:09] do better planning and less impact to [1:03:12] the street with res. [1:03:19] You do have the school on N Green um [1:03:22] which you can narrow down to a [1:03:26] two-lane road through that piece and [1:03:28] then widen back out to a to a threelane [1:03:32] piece. Um [1:03:35] but that you have a lot more flexibility [1:03:38] with N [clears throat] green than you do [1:03:40] on Dery itself. [1:03:42] >> Well, Dury is already one of the [1:03:43] heaviest traffic roads right there. [1:03:46] >> Yeah. Yep. [1:03:49] >> [clears throat] [1:03:53] » So I can draw it coming down [1:03:56] crossing over here. [1:03:59] Or [1:04:01] I mean if it's an option still it sounds [1:04:03] like it's not an option to go through [1:04:05] their property though, right? [1:04:10] » The politics we want to play. Okay. [1:04:13] >> I guess I'll leave the politics uh up to [1:04:16] the politicians. [1:04:18] Um, if you want to try and push it [1:04:20] through their property, we can draw it [1:04:22] like that. Or we can try [1:04:25] [clears throat] drawing it through on [1:04:27] the west side of their property coming [1:04:29] down. [1:04:30] >> What about right there? That triangle go [1:04:32] back up coming off right there and just [1:04:35] coming straight. You're you're [1:04:36] perpendicular to right there. [1:04:38] >> Right there. And then coming across. [1:04:40] Yeah. [1:04:44] » Seems [clears throat] like only real [1:04:45] option. [1:04:47] Or we can leave it how it show. [1:04:56] » Either way, McLean, it sounds like you [1:04:58] got to do something with 112 and Dury [1:05:00] connection regardless of where you make [1:05:02] the 33rd connection on 112. [1:05:06] >> Yeah. [1:05:07] That close to Derby. It's going to just [1:05:09] be a bottleneck. [1:05:11] >> Can't believe there's not been more [1:05:12] accidents right there on ve. [1:05:15] Yeah. [1:05:18] >> Knock on wood. [laughter] [1:05:21] >> There was a death there while ago. [1:05:34] It's a little hot spot, but not too [1:05:36] [clears throat] not too bad. Any [1:05:40] thoughts? [1:05:46] » I'd like the night green. [1:05:47] >> Bring it down. [1:05:50] >> I agree. [1:05:52] >> Okay. [1:05:52] >> You were talking about the width of the [1:05:54] road in front of the school affecting it [1:05:57] is 90 ft currently. So, [1:06:00] >> okay. [1:06:02] >> It's [clears throat] already what we [1:06:03] need it to be. [1:06:04] >> Okay. [1:06:05] >> So, that's that's done. But I also agree [1:06:08] that dealing with that intersection of [1:06:10] Dery Street crossing [1:06:13] 112 is something that has to be [1:06:18] >> probably going to happen. [1:06:19] >> Yes. [1:06:23] » On the east side or the west side [1:06:26] >> of 112. [1:06:27] >> Yeah. [1:06:28] >> I I think that it just is going to need [1:06:30] to cross in some [1:06:33] whether it connects to the 33rd Parkway. [1:06:36] I don't know. But I just think you're [1:06:37] going to get a bottleneck of traffic of [1:06:38] people trying to get to the 33rd Parkway [1:06:41] from Dery Street. [1:06:43] >> Right. [1:06:45] >> Yeah. If a connection doesn't happen [1:06:48] there, [1:06:50] they would have to come up [1:06:52] >> and then turn and come out, [1:06:54] >> which would which isn't a crisis. I just [1:06:57] know how [1:06:58] our nature is to find the path of least [1:07:01] resistance and and and the shortest path [1:07:04] as the crow flies. And so we're going to [1:07:07] I just can imagine that could be [1:07:10] >> What do you proposing a tunnel? [1:07:12] >> Yes, I'd like a tunnel. A subway a [1:07:14] subway starting [laughter] [1:07:17] >> an underpass. [1:07:18] >> Could they do a right in right out on [1:07:20] that coming in that side? So you would [1:07:21] it would wouldn't be a full [1:07:22] intersection, but it would allow people [1:07:24] to access 112 right there without having [1:07:27] to totally make it congested because [1:07:28] you're not going to be able to have two [1:07:29] intersections that are offset. You don't [1:07:31] want to allow that. [1:07:33] >> No, [1:07:34] >> I'm surprised they've let it fly right [1:07:37] out. [1:07:38] >> That's an option as well. I mean, I [1:07:40] >> you could do a large roundabout, too. [1:07:42] >> I like that. [1:07:43] >> That name [laughter] was an offset [1:07:46] geometry. [1:07:46] >> I knew that was coming. see a hot [1:07:49] roundabout Europe [laughter] [1:07:53] five roundabouts in the city [1:07:55] proposing that [laughter] [1:08:00] [clears throat] [1:08:01] >> um what I'll do is I'll uh clean this [1:08:04] up. I'll bring this down probably cross [1:08:07] it um and then still show a connection [1:08:12] connecting in. You have to cross it at [1:08:14] the [1:08:15] >> at the at this light at the signal sites [1:08:18] that have already been established by UD [1:08:20] do. Is that what you're trying to get [1:08:21] to? Okay. [1:08:22] >> You can't do it at any other spot now [1:08:24] unless we amend our agreement with you [1:08:25] do [1:08:26] >> on what on the quarter agreement. [1:08:30] >> Okay. [1:08:30] >> Is the purple approved? What's approved [1:08:33] with you do right now? The intersection [1:08:36] >> I think it is the personal channel that [1:08:39] there by his mouse is approved. [1:08:42] >> Yeah. [1:08:44] two intersections that close. [1:08:46] >> They're like [1:08:49] half a mile apart, I think, is [1:08:52] >> their rule. [1:09:00] » Sorry, I'm just making a note really [1:09:01] quick. [1:09:05] Okay. [1:09:08] Um, let's see. [1:09:18] Shelby, was there one more? I think that [1:09:20] was it. [1:09:22] Was there one more? [1:09:24] >> I think it's maybe answered, but just to [1:09:26] the northwest where the two um arterial [1:09:30] roads are fairly close together near the [1:09:33] flux area. [1:09:34] >> Oh, yes. [1:09:34] >> Did you already cover that? Yeah, they [1:09:36] said keep the width and they'll build [1:09:40] road within that width [1:09:44] is what I was told. [1:09:45] >> Yes. [1:09:46] >> Okay. [1:09:47] >> I think that makes good sense on the [1:09:49] west bench. I down in that particular [1:09:51] north area. I I mean those are really [1:09:54] close together as they bottleneck down [1:09:57] there. So I I'm not sure about [1:10:02] >> that particular spot. We could change [1:10:05] like [1:10:05] >> there. [1:10:06] >> No, not there. I'm talking on the north [1:10:09] >> east of 138. [1:10:12] >> So through here [1:10:12] >> right here. Yeah. [1:10:14] >> But I mean, how far away are we talking? [1:10:16] >> I don't know. [1:10:16] >> A mile, half mile thing. [1:10:18] >> I don't think it's that. [1:10:20] >> No. [1:10:21] >> What if you What if you went to the [1:10:23] south of those properties instead of [1:10:24] going up and around them, you just [1:10:26] stayed to the south of them? So it's a [1:10:28] straight line. Can we do that or are [1:10:31] these [1:10:32] >> Where are you talking? So the the not [1:10:34] the top green line, the one in So you're [1:10:36] right. You see those developments how it [1:10:38] juts up [1:10:38] >> to the north of those and then it swings [1:10:41] back down south. [1:10:42] >> Yep. [1:10:43] >> Yeah. [1:10:43] >> We just go to the south of those [1:10:45] properties and so it's a straight line [1:10:47] all the way across. Then those two roads [1:10:49] aren't so close. [1:10:51] Yeah. [1:10:57] » Yeah. There's a lot of [1:10:59] >> there's a lot of [1:11:00] >> property in there with structures on it. [1:11:03] >> We tried to avoid those, but the best we [1:11:06] could [1:11:09] >> is the north green line the edge of that [1:11:11] excession. [1:11:13] >> No. Um, [1:11:15] >> is that what pushes it south? because [1:11:18] that's the north boundary there. [1:11:20] >> No, your annexation limits are pretty [1:11:22] wide. [1:11:24] Um, [1:11:27] the current city limit. [1:11:29] >> Why does it come down right right there? [1:11:32] That one on the north. Why doesn't it [1:11:34] just straight into 130? [1:11:36] >> Why doesn't it just go through here? [1:11:38] >> No, the upper one. [1:11:39] >> This one? [1:11:40] >> Yeah. Why is that down? [1:11:44] » Why does it come up to here? We're just [1:11:46] trying to follow this property line. [1:11:48] >> But I'm saying farther west. Why does it [1:11:50] just go straight right? [1:11:53] Why does it come down? [1:11:56] >> There's a mine. If you keep going to the [1:11:58] um west. [1:12:01] >> Oh, you're saying why doesn't it just [1:12:03] come like this? [1:12:04] >> Yeah. All the way. [1:12:06] >> We tried to line it up with this little [1:12:08] mountain road. [1:12:09] >> I [1:12:15] » [clears throat] [1:12:19] » We can look at this area too and see if [1:12:21] we can brainstorm how to get those [1:12:23] separated a little bit more as well. [1:12:29] » If that more north line stayed straight [1:12:31] like you were saying, I think you'd have [1:12:32] more of a distance there. that road to [1:12:34] the west. You said you tried to line up [1:12:36] to it. If that's not that might be [1:12:38] easier to move around than trying to get [1:12:40] else above. [1:12:41] >> I just go straight on that north [1:12:43] >> green line [1:12:46] >> back to the east. [1:12:47] >> Just don't jog it down. Just go [1:12:49] straight. [1:12:49] >> Yeah. [1:12:50] >> Okay. [1:12:51] >> Well, except as far as the desireette [1:12:54] development, isn't that kind of a major [1:12:56] cross point that it makes sense to have [1:12:59] that in there? No. [1:13:00] >> Little mountain. I think it's the lower [1:13:02] one. [1:13:03] This one. [1:13:04] >> That one. Okay, you're right. Because [1:13:06] there's Yes. Sorry. You're right. [1:13:10] >> I'll push this one up so it's a little [1:13:13] further away as well. [1:13:14] >> Go straight. [1:13:15] >> Yeah. Through here. [1:13:18] Okay. [1:13:21] Any other questions on the [1:13:23] classification network? [1:13:32] now that I put you all all to sleep. Um [1:13:36] so just for your information really [1:13:38] there's a 50page report that really will [1:13:40] put you to sleep that you can read. It [1:13:42] will be online um that you can read. Um [1:13:46] the PDF is not currently on there. We [1:13:48] will be putting it on um today. Well, [1:13:51] not today, tomorrow or Thursday. [1:13:54] Um [1:13:58] so there's that report. [1:14:00] There is a document section in here that [1:14:02] links you to all the municipal code [1:14:05] pages within the city. So for planning [1:14:07] and zoning, this is nice. They can pull [1:14:09] this transportation plan up when they [1:14:11] have projects coming and they can pull [1:14:14] the code up from this website as well. [1:14:17] We also have a 300page appendix with all [1:14:20] the maps, hard copy maps, because the [1:14:22] website technically isn't what you adopt, [clears throat] but it's just a [1:14:26] tool for you to use in house. um you're [1:14:30] actually adopting the report with the [1:14:32] appendix as well. [1:14:36] [clears throat] Then we have a [1:14:37] definition sheet. [1:14:40] Um this is mostly for the public just [1:14:43] going through some of the jargon that we [1:14:45] use in the transportation plan. You can [1:14:48] read through um each one of these [1:14:51] definitions and see what we're talking [1:14:54] about. [1:15:01] Shelby, any other items you can think of [1:15:04] or anybody else that wants to bring up [1:15:07] anything that's a plan itself? We've [1:15:10] been here for a while. I know. Any other [1:15:13] thoughts? [1:15:14] >> Thank you. [1:15:16] >> Any questions from council or the [1:15:18] planning commission? [1:15:21] » No. [1:15:23] Melissa, we know this is a lot to digest [1:15:25] and so that's why we wanted to give you [1:15:26] a couple weeks to look through it before [1:15:28] we had a a public meeting. Um be [1:15:31] available to answer any questions that [1:15:34] may come up and then um we'll uh we'll [1:15:37] get this in front of you guys for [1:15:39] adoption in the next little bit. [1:15:42] So the plan is two weeks from now we'll [1:15:46] do the public openhouse. We'll leave it [1:15:48] open for two weeks after that for public [1:15:50] comment. We'll get you all of the [1:15:52] comments to look at if we get any. Um, [1:15:56] and then we'll go through those [1:15:58] comments, address them. Then it goes to [1:16:01] public hearing at the planning [1:16:02] commission level and then it will go [1:16:05] they'll recommend to the council for [1:16:07] adoption and then the the council will [1:16:11] then adopt after that. [1:16:14] How long was the last public? [1:16:17] >> Uh, [1:16:19] unless your code requires that. [1:16:21] [clears throat] [1:16:22] >> Typically, no. But [1:16:24] >> if your code does require it, then yes, [1:16:26] you will. [1:16:27] >> Okay. [1:16:27] >> Um, [1:16:29] >> was the last plan for traffic last [1:16:33] >> 2021 [1:16:35] was the last plan? [1:16:36] >> 2022. [1:16:37] tried amending it again in 2023 [1:16:42] but that failed. [1:16:45] So the kind of the draft that we talked [1:16:48] about last year was this the draft that [1:16:51] was preliminary or [1:16:53] >> it was um done by Horox I believe um and [1:16:57] it was just just in [1:17:01] » Do you mine do you do any like overlay [1:17:05] of uh sensitive lands on the proposed [1:17:10] >> on the proposed? Yeah, like wetlands and [1:17:13] stuff [1:17:14] >> typically in this level of study. No. [1:17:17] >> Okay. [1:17:17] >> Um when we're looking at like a specific [1:17:19] corridor we do, but we're looking super [1:17:23] high level. We're strictly looking at [1:17:26] traffic numbers, how to fix the issues [1:17:29] with traffic, and then if you want to [1:17:32] look at certain corridors, then we can [1:17:34] look at that. But in this study, no to [1:17:37] that one. [1:17:38] >> Thank you. [1:17:39] I did forget one item. Um, [1:17:43] so we did cost estimates, inflated them [1:17:46] up to the year that they're anticipated [1:17:49] to go in. [1:17:50] >> This is a lot of money. Um, if you were [1:17:53] to put every road within the city at [1:17:56] full buildout, including developers, UD [1:17:59] do county, and city, you're 835 million. [1:18:03] >> Is that all? [1:18:04] >> That's it. Trump change. Is that include [1:18:07] like traffic lights? [1:18:10] >> This is just roads. [1:18:11] >> Oh, okay. Yeah, I didn't think [1:18:13] [laughter] so. [1:18:15] >> That would double that, right? [1:18:18] >> Not quite, but [1:18:20] >> Okay. [1:18:21] >> Um, so the city right now is only we [1:18:25] only have you guys putting in [1:18:28] responsible for half of depot. [1:18:31] um the widening projects within the city [1:18:34] that need to happen and then [1:18:38] um I think that's it honestly the [1:18:41] widenings and deeper road itself [1:18:44] um the county is responsible for some [1:18:48] you're teaming with the county on some [1:18:50] of these so the county is responsible [1:18:53] for about 145,000 or 145 million UDOT's [1:18:58] responsible for about 125 5 million and [1:19:01] then developers take [clears throat] the [1:19:03] brunt of it at about 450 million. [1:19:13] This also takes into account, I will [1:19:15] say, the crosssections of the wider ride [1:19:18] ofway being five lanes instead of three. [1:19:21] So if you want us to take that down to [1:19:25] three lanes, we can do that. So that'll [1:19:26] decrease that cost a little bit. [1:19:33] No, because it'll just make everything [1:19:35] else red. [1:19:35] >> Yeah. [1:19:36] More red. [laughter] [1:19:38] >> So, the answer that question is no. [1:19:40] >> Okay. [1:19:40] >> I mean, we [1:19:41] >> Sorry, but [1:19:42] >> yeah, leave it there and we'll have to [1:19:44] build as we can. That's all there is to [1:19:47] it. [1:19:50] >> Okay. Okay. That's all I have for you [1:19:53] tonight. [1:19:53] >> Thank you. [1:20:00] » [clears throat] [1:20:01] >> Did I close out? [1:20:03] >> Any other comments from the council or [1:20:04] commission? [1:20:06] >> Okay, we'll move on to agenda item [1:20:09] number two, a discussion of proposed [1:20:10] amendments to the parks and [1:20:12] transportation capital facilities plans, [1:20:15] impact fee facilities plans, and impact [1:20:17] fee analysis for Grantsville City. [1:20:21] >> You want me to plug in or are you able [1:20:23] to share that PDF? [1:20:24] >> Um, I can share the PDF. [1:20:37] Yeah, that'll work. You want me to run [1:20:39] with [1:20:40] >> Sure. [1:20:40] >> Okay. [1:20:45] » So, I'm Robert Rousell with Enzyme [1:20:46] Engineering. [1:20:48] Annually, we uh amend the capital [1:20:51] facility plan, impact facility plans, [1:20:53] and impact Ve analysis. I'm sorry, that [1:20:56] was me. [1:20:56] >> Oh, [1:20:57] >> sorry. I'm just trying to stretch it out [1:20:59] on the screen, but [1:21:00] >> Okay. [1:21:00] >> Sorry. [1:21:02] >> And uh an item of correction is we [1:21:05] basically amended everything except for [1:21:07] the transportation. So, we include [1:21:08] parks, you know, drinking water, waste [1:21:10] water, uh water ice acquisition, storm [1:21:13] drainage. [1:21:17] » I do not know why it's [1:21:26] So maybe [1:21:28] can we budget me? Thank you. [1:21:31] [laughter] [1:21:33] » Okay. So you take a five minute break. [1:21:35] >> Yeah. I think [1:21:36] >> Yeah, we'll take a five minute break. [1:21:38] >> Technology break. [1:21:39] >> A tech break. [1:21:43] » Yeah. [1:21:46] Can't handle it. [1:21:51] And then do I need to log into [1:21:56] » I think [1:22:02] that or is it a special [1:22:10] » we use a separate phone. [1:22:12] >> So yeah, how do I do that? [1:22:13] >> Start deleting [1:22:14] >> your own stuff. So he's a separate not [1:22:22] » should be good. [1:22:23] >> Yeah. [1:22:24] >> Well, [1:22:24] >> we provided these days [1:22:30] to go to school bus. [1:22:31] >> Yeah. [1:22:41] So like if [1:22:43] you drive it and then it'll update [1:22:46] automatically. [1:23:01] I know it isn't [1:23:02] >> the hard part. [1:23:05] Yeah, the imagery's [1:23:09] » big. [1:23:12] [clears throat] [1:23:17] It's hard to see. [1:23:19] >> So, it'll catch it as patchy, but it [1:23:22] won't catch it as [1:23:23] >> red. [1:23:32] showing up. [1:27:06] Good thing you get paid by the huh [1:27:11] » life cycle. [1:27:14] » That's good because I've always [1:27:24] » Are you ready, Robert? [1:27:27] truck by the hour. [1:27:30] >> He doesn't care. [1:27:30] >> No, we are we are hourly. [1:27:34] >> In that case, we'll get started. [1:27:37] [laughter] [1:27:37] >> So, our thought process, right? [1:27:41] >> We're [1:27:43] going to to go back into um our session [1:27:46] of this meeting and continue our [1:27:48] discussion with item number two. It [1:27:50] appears the [1:27:52] >> that we're ready. [1:27:54] >> Order in the court. [1:27:56] All right. Go go go ahead, Robert. [1:27:58] >> Okay. Yeah. So, Robert Rousell with Enzy [1:28:00] Engineering. [1:28:02] >> Yeah. We're we're basically looking at [1:28:03] amendments to everything except for [1:28:05] transportation. Once the transportation [1:28:07] master plan is approved, then we'll update and uh bring that for [1:28:12] planning commission, city council. [1:28:18] So, we do uh amend these annually. We [1:28:21] did amend parks and transportation uh in [1:28:25] January. It's when it was approved by [1:28:27] city council. There was a few changes [1:28:30] there just to bring the transportation [1:28:32] impact fee down. And then parks we [1:28:35] updated with like scenic slopes and a [1:28:37] few other projects. [1:28:40] So yeah, impact fees uh I won't read [1:28:42] everything here, but help fund expansion [1:28:44] of uh you know to accommodate future [1:28:47] growth. Uh we met with city staff [1:28:49] multiple times in December and then once [1:28:51] we had a draft, you know, we we met a [1:28:54] couple weeks ago. It takes 90 days [1:28:57] before impact fees are approved by city [1:28:58] council before they go into effect. And [1:29:01] uh any developer funded projects, which [1:29:04] you'll see some of those throughout [1:29:05] here, are not impact eligible. We did [1:29:09] utilize the demographics [1:29:11] that we had updated for the 2026 sewer [1:29:14] rates which was kind of a little bit [1:29:15] lower of a projection uh for the next 10 [1:29:18] years. [clears throat] Uh I mentioned [1:29:21] there that you know typically the growth [1:29:23] rate for Grantsville over the last 26 [1:29:24] years has been four and a half to 5%. [1:29:27] There was some spikes during the co [1:29:28] years. [1:29:30] What we do is we determine the capital [1:29:31] improvement projects using the [1:29:33] demographics and level of service uh for [1:29:35] the various you know for water [1:29:37] wastewater the other and parks. Uh and [1:29:41] then we determine any non- capital [1:29:43] improvement project costs such as [1:29:46] interest expense for bonds uh existing [1:29:49] capital assets professional expenses and [1:29:51] then future debt service. [1:29:56] As I mentioned, here's kind of the the [1:29:58] growth rate uh for the demographics uh [1:30:01] section that we utilized. Starting off [1:30:03] with like 3 and 12% for a couple years [1:30:06] and then a 4% growth rate through the [1:30:08] 10-year planning period. [1:30:15] And then we look at different sub areas [1:30:17] and and what this helps us with is [1:30:20] projecting where growth's going to occur [1:30:21] and where improvements are going to need [1:30:23] to be made. [1:30:27] This just summarizes the, you know, the [1:30:29] residential growth rate, the commercial [1:30:30] growth rate. That was another thing we [1:30:32] did modify is we previously had used a [1:30:35] growth rate, the same growth rate for [1:30:37] residential as commercial, but looking [1:30:39] back at previous building permits over [1:30:41] the last, I believe it was five or six [1:30:43] years. What we found was, you know, the [1:30:45] commercial growth rate was hovering a [1:30:47] little bit less or or at 1%. So, we've [1:30:50] made that update move forward. [1:30:55] We haven't changed for drinking water. [1:30:57] We haven't changed the level of service. [1:30:58] And this is based on for for indoor it's [1:31:00] based on metered usage. We use state uh [1:31:04] values for outdoor just because this [1:31:08] change was made gosh in 2022 when we [1:31:13] were having drought years and towards [1:31:15] the end of the summer we were seeing [1:31:17] more usage of city water for irrigation [1:31:20] instead of grants irrigation company [1:31:21] water. [1:31:25] drinking water projects. We've got [1:31:28] they're all kind of listed there. A lot [1:31:30] of those you can see that are zero [1:31:32] impact v eligible costs. Those are [1:31:33] developer projects. [1:31:36] The Bates well is currently being [1:31:39] drilled. Northstar tank, we're just [1:31:41] waiting for the Green water line to [1:31:43] be finished so we can fill that. Uh so [1:31:46] those u are projects that are currently [1:31:50] being built. Northstar tank number one [1:31:52] was needed previously for you know [1:31:55] growth and so it was previously impact v [1:31:57] eligible and in older plans but now you [1:32:00] know there's not enough capacity so it's [1:32:02] no longer impact v eligible [1:32:06] » how many projects is that [1:32:09] >> well and there's even more these are [1:32:10] just ones we looked at is impact be [1:32:12] eligible and yeah if you look in the [1:32:14] like the main study you'll see them [1:32:15] there I mean there's probably what 15 [1:32:19] there we can count up. But [1:32:21] >> yeah, this shows kind even more. I guess [1:32:26] there's 28 overall, but some of these [1:32:30] I'll try to zoom in here. [1:32:34] Some of these are replacements, you [1:32:35] know, when you get in into the city, you [1:32:37] know, just replacing a lot of the [1:32:38] smaller lines with larger lines. The [1:32:41] standards 8 inch diameter [1:32:46] and this is just looking 10 years out. [1:32:48] So they're, you know, like for [1:32:50] Desireette for this development for [1:32:52] example, [1:32:54] we're really just showing kind of the [1:32:55] backbone infrastructure. We anticipate [1:32:57] the developer would be building kind of [1:32:59] these interconnecting water lines and then we don't anticipate they'll [1:33:05] build like their zone 7 tank in the next [1:33:08] 10 years. [1:33:17] So there's a little bit of change in [1:33:18] impact fees. They they do go up a little [1:33:21] bit. We base them based on meter size [1:33:24] for residential and then non-residential [1:33:26] we use per fixure unit. And that's [1:33:29] assuming and it's in the report that uh you know the equivalent ERC is [1:33:35] which is equivalent residential [1:33:37] connection has 24 fixed units to [1:33:41] basically get a cost for per fixture [1:33:43] unit. [1:33:47] And feel free to yeah just stop me if [1:33:49] you have any questions as I go along. [1:33:51] >> Public safety we left the level of [1:33:53] service that change there. I this wasn't [1:33:55] in the packet but it is in the report. I [1:33:58] kind of just threw it in here just to [1:34:00] explain that what we did look at for [1:34:02] public safety was when we calculate the [1:34:04] fee, we went to a a dwelling unit or a [1:34:09] unit for non-residential [1:34:11] and we based it based on CAD calls from [1:34:15] the police department to get a little [1:34:18] bit more accurate of what the impact is [1:34:21] for, for example, single family, [1:34:24] multifamily, and non-residential. That [1:34:26] was using 2025 data from the police [1:34:28] department and we'll we'll continue to [1:34:31] update that yearly as we get more data [1:34:33] and the police department's now tracking [1:34:34] that. So what we found out was you know [1:34:36] single family you know there's basically [1:34:40] 575 calls per per unit. Multif family is [1:34:44] almost two and on residential two and a [1:34:46] half. And I'll show you kind of where [1:34:48] that comes into play. Oh skipped a bit [1:34:51] too far. [1:35:07] As far as capital improvement projects, [1:35:09] one change that we did did do uh just [1:35:11] because we don't have the need quite yet [1:35:14] is we've kept the we've kept the cost in [1:35:18] there for future satellite fire station, [1:35:20] but we did not put it in for impact fee [1:35:24] eligibility. [1:35:25] Uh because we since we're amending this [1:35:28] annually, you know, once we see the [1:35:30] need, then we'll we'll add it back in. [1:35:31] So, we're collecting impact fees. So, [1:35:33] the impact fee eligible costs are [1:35:35] actually the animal control shelter and [1:35:37] then the justice center police [1:35:39] expansion. [1:35:43] This this just shows where we [1:35:44] anticipate, [1:35:46] you know, improvements to be made. We've [1:35:48] got a little note there that you know [1:35:49] that actual project location will depend [1:35:52] on you know how development occurs [1:35:56] and here's the big change where I uh [1:35:59] that I was mentioning. So it has gone [1:36:01] down per dwelling unit for single family [1:36:03] for example but has gone up for [1:36:05] multi-unit and non-residential and [1:36:07] that's just because there's more calls [1:36:11] for those you know those land uses [1:36:17] parks left level service same there four [1:36:20] acres uh per thousand population [1:36:25] we had to just to keep the impact fee [1:36:28] balance positive there there just one [1:36:30] year where it goes negative, which is [1:36:31] fine. Um, but to to keep it positive, we [1:36:35] did adjust some of these dates. Uh, [1:36:38] let's see. So, like the just the phases [1:36:41] on Scenic Slopes Park and then [1:36:44] President's Park, we moved those out. [1:36:46] Kind of looked at, okay, well, when [1:36:48] realistically is President's Park going [1:36:50] to be like 60% developed and and [1:36:52] adjusted that date accordingly. [1:36:57] And then here kind of shows all the [1:36:59] projected parks in red. [1:37:03] And so that caused it to go down [1:37:05] slightly from what it was previously. [1:37:12] Wastewater. We've kind of go over gone [1:37:14] over this in nauseium with [laughter] [1:37:17] with city council meetings, but uh the [1:37:20] big one is the you know the treatment [1:37:22] plant. So we've got that in here. And [1:37:25] then there's the upsize of the West Bank [1:37:27] interceptor, you know, segments one and [1:37:29] two. [1:37:31] And then the Northwest lift station, [1:37:32] which will occur kind of in conjunction [1:37:35] with the uh treatment plant, just [1:37:38] upsizing the force main to get a little [1:37:39] bit more life out of that lift station. [1:37:42] And then uh public works improvements, [1:37:44] we did push it out, you know, towards [1:37:45] the end of the planning period. [1:37:49] So yeah, you've probably seen this [1:37:51] figure before, but it's just showing the [1:37:54] kind of the West Bank interceptor, this [1:37:55] line here, the uh Vegas Street [1:37:58] Collector, and then the uh SR12 [1:38:02] interceptor, which would be developer [1:38:04] constructed and Southwest sewer line, [1:38:07] and then there's obviously the the [1:38:09] upgrades to the treatment plant. [1:38:14] So this one did go up slightly. We [1:38:19] uh because of the upsize we added you [1:38:21] know for the West Bank interceptor we [1:38:22] did pull previously we had like the [1:38:24] Willow Street collector after looking at [1:38:27] a little bit more detail that project [1:38:28] wasn't needed so it was moved kind of [1:38:30] outside of the 10-year planning period [1:38:32] so it did go up a little bit. [1:38:37] water rights uh pretty much stayed the [1:38:40] same except for [1:38:44] the uh multi-unit residential. We really [1:38:47] what drives this is the current if if [1:38:50] you can find the water rights the [1:38:51] current water rights cost. So we're [1:38:54] using 29,000 [1:38:56] per irrigated acre. [1:38:59] Uh, and the the difference here is just [1:39:01] multi-unit residential just factoring in [1:39:05] kind of the because we're using town [1:39:08] homes as a as part of multi-unit [1:39:10] residential and that means that waterite [1:39:13] quantity is a little bit more. So that has gone up just slightly. [1:39:20] storm drainage. We don't, you know, the [1:39:22] city does not charge impact fees for [1:39:25] storm drainage because a lot of the [1:39:26] storm drainage right now is developer [1:39:30] constructed. [1:39:31] If there's a you you can charge impact [1:39:34] fees in the future if there's any more [1:39:36] regional projects that are planned on and the city's paying for [1:39:39] those. [1:39:42] So, here we've just listed the the storm [1:39:45] drainage guidelines for the city right [1:39:48] now. [1:39:49] A lot of this is based on the West Bank [1:39:52] interceptor or not the West Bank storm [1:39:55] drain master plan. [1:39:58] So the the city has constructed this [1:40:00] Clark Street storm drain improvements [1:40:02] project. There was a a grant for it. [1:40:04] There's some future phases that are [1:40:06] planned for this which would you know be [1:40:09] a retention basin up higher in the the [1:40:12] basin and then it's kind of turned [1:40:15] sideways. But uh yeah, these are all the [1:40:17] projects that were identified in the [1:40:19] West Bank storm drainage master plan. [1:40:26] And as I mentioned, storm drainage, [1:40:28] they're not applicable just because [1:40:30] they're really all the improvements thus [1:40:33] far are constructed by developers [1:40:35] directly. [1:40:37] But if if that's something in the future [1:40:39] the city wants to charge impact fees [1:40:41] for, then it'd have to be looked at as [1:40:44] more regional improvements. [1:40:50] Impact fee comparisons. We look at we we [1:40:53] kind of went over this last year, but we [1:40:55] look at like a smaller 5,000 foot retail [1:40:59] and then we compare them to [1:41:02] not necessarily similar cities, but at [1:41:04] least cities that have similar impact [1:41:06] fees and kind of show you where the [1:41:10] proposed and then existing, you know, [1:41:12] Grantsville impact fees are. So, for [1:41:15] example, you know, retail's gone up a [1:41:17] little bit, and I think that was due [1:41:19] more to the public safety, just the [1:41:23] change in, you know, the costs per unit [1:41:25] that drove that [1:41:28] uh thousand square foot building that's [1:41:31] gone down and that and that's kind of [1:41:33] had the opposite. You know, we were [1:41:34] basing [1:41:36] public for public safety, we're basing [1:41:38] it on square footage previously and now [1:41:41] we're basing it on units. So if you had [1:41:42] a thousand or a million square foot [1:41:46] warehouse for example and it just was [1:41:48] one unit with one water service one you [1:41:51] know sewer service then it would just be [1:41:52] charged that one impact fee per per [1:41:56] unit. [1:42:02] Town homes, it's gone down slightly. [1:42:05] Single family slightly gone down. Here [1:42:08] is where where the city's kind of hidden [1:42:11] about right in the middle of the [1:42:12] comparison cities. [1:42:15] And then apartments also gone down as [1:42:18] well, [1:42:24] I guess. Yeah. Are there any questions? [1:42:29] Was [1:42:34] [cough and clears throat] [1:42:35] there a slide and I missed it on? We [1:42:39] talked about sewer [1:42:41] bills. [1:42:43] Water. I was worried about water bills. [1:42:46] Water. [1:42:48] I don't see it. [1:42:49] >> Water. [1:42:52] >> Yeah. So, there's water. This This is [1:42:54] impact. So, this isn't the rates. [1:42:57] There are rates in here. [1:43:00] >> No, this is just this is impact. So, not [1:43:02] the water rates. [1:43:03] >> Okay. [1:43:12] [clears throat] [1:43:21] » Yes. Yeah. Any [1:43:23] comments from [1:43:25] >> I guess just my question would be is Is [1:43:27] it a dance? We're dancing trying to [1:43:29] compete with other cities to keep impact [1:43:31] fees low or why not why not put a little [1:43:33] buffer on there and make some extra. [1:43:36] What what prevents us from doing that? [1:43:39] >> Yeah, I mean you try to try to stay [1:43:44] I know I've I've listened to talks that [1:43:46] developers have had right at conferences [1:43:47] and that type of thing is you try to [1:43:49] stay competitive. I mean, if you're [1:43:50] charging too much, then you're just not [1:43:52] going to see the growth. And then if [1:43:55] you're charging, you know, too less, [1:43:56] then you're not paying for the [1:43:58] improvements you need. So, it's it is [1:44:00] kind of a balance there. Uh really, we [1:44:04] look at, you know, with our level of [1:44:05] service, hey, what improvements are [1:44:07] needed and then there's only so much we [1:44:10] can do. We we're looking at a 10-year [1:44:12] planning period. So, that's that's the [1:44:15] ERC's, equivalent residential [1:44:16] connections in that 10 years. And [1:44:19] there's only so much we can can do there [1:44:21] with those improvements. [1:44:23] >> The other challenge is too if we we get [1:44:26] too crazy with it, the uh developers [1:44:29] will notice that it's too crazy and [1:44:31] they'll push back and and then all of [1:44:33] this comes out and they'll say you're [1:44:35] basing it off of not good data or good [1:44:38] engineering. You're basing it off of a [1:44:40] desire to have too much. And that opens [1:44:44] up our impact piece challenge, legal [1:44:46] challenge. and then we right back here [1:44:49] giving it all over again. So we got to [1:44:53] stay within a pretty narrow band of [1:44:55] what's allowed. [1:44:57] >> So there's law that governs what we can [1:44:59] do. You just can't make something up. [1:45:01] There's laws that are saying [1:45:02] >> that's the whole point of doing this [1:45:03] study anyway. This impact fees are are [1:45:06] one of those things that is just so [1:45:09] heavily regulated and and rightfully so. [1:45:11] I mean, no one wants to pay more than [1:45:13] they have to, and this is a a cost that [1:45:16] eventually gets pushed back onto [1:45:19] homeowners [1:45:20] um to pay. And uh yeah, [1:45:31] does anybody else have any questions? [1:45:33] the commission council. [1:45:38] » Are is the city looking at not waving [1:45:41] fees as much now? [1:45:47] » What are you referring to? [1:45:49] >> Um I know that we've waved fees in the [1:45:51] past and so with Cameron's concern [1:45:56] um about maintaining a balance, [1:46:01] I just [1:46:04] Um, I just wonder are these static or [1:46:07] are they fluid? [1:46:10] Are they I think any impact fee is [1:46:12] fluid, especially when it comes to [1:46:13] commercial impact fees and you're in [1:46:16] direct competition with municipalities, [1:46:18] right? [1:46:18] >> Waving fees for the keep the project [1:46:20] going is common practice across multiple [1:46:23] municipalities and not for years because [1:46:25] you want to drive business, economic [1:46:27] business growth. [1:46:28] >> Yeah. [1:46:29] >> Residential and housing growth not [1:46:31] probably not as much. [1:46:32] But commercial and and waving and [1:46:36] assisting or waving impact fees on [1:46:38] commercial development, I I would still [1:46:40] think that you would see that as a [1:46:42] one-on-one. I mean, I don't think it's a set. It's still on a case by case [1:46:46] basis. [1:46:49] >> Barry, go ahead. [1:46:50] >> Oh, I was gonna Robert. I'll try my [1:46:52] best. [1:46:53] >> So, this is a 10-year window, right? [1:46:54] Looking at the next 10 years. And so, [1:46:56] next year, it's the next 10 years. And [1:46:57] so, it's going to change. The next 10 [1:46:59] years are going to change. So there has [1:47:01] to be some Yeah. fluidity. [1:47:05] >> Yeah. And I've mentioned like for [1:47:07] wastewater treatment, right? So the the [1:47:08] plant like even though there's an impact [1:47:11] fee now, like as long as that plant has [1:47:13] capacity, excess capacity, you can [1:47:16] charge buyins for that buyin fees. Y [1:47:23] » and a lot of this data that's kind of [1:47:25] why we went there with uh transfer [1:47:27] transportation for example we're based [1:47:29] like for non non-residential we're [1:47:31] basing that based on their actual [1:47:32] traffic study. So they they come in you [1:47:36] know it it'll be reviewed by city staff [1:47:39] you know the the transportation study [1:47:41] and then that'll kind of dictate what [1:47:42] their impact fees are. And we what we [1:47:45] use on a lot of these is we we try to [1:47:48] use specific city data to back up level [1:47:51] of service. So it's it's specific to [1:47:54] Grantsville. [1:48:02] » Any other questions or comments? [1:48:05] >> All right. Thank you, Robert. [1:48:09] » All right. Um with that, I need a motion [1:48:12] to adjurnn. [1:48:14] Mayor, I'll make a motion we adjurnn. [1:48:17] >> Uh, we have a motion to adjurnn by [1:48:19] council member Dalton. Is there a [1:48:20] second? [1:48:22] >> Second. [1:48:22] >> And a second by council member Williams. [1:48:24] All in favor? [1:48:25] >> I. [1:48:27] >> Thank you for uh MLAN and Robert. For [1:48:30] your information, please. [1:48:36] You were worried about that. [1:48:45] » Couldn't find where I saw [1:48:56] something. [1:48:58] >> Yeah. Tomorrow.