1 00:00:00,000 --> 00:00:06,300 Welcome everybody to the Wednesday, August 26th, or not September 9th, meeting of the 2 00:00:06,300 --> 00:00:10,740 Talgette and Planning Board. Please note the exit, case they're needed. Our first business 3 00:00:10,740 --> 00:00:14,600 evening is approval of the August 26th, minutes. Can I have a motion? 4 00:00:15,040 --> 00:00:17,180 So moved. Thank you, Lord, I have a second. 5 00:00:18,180 --> 00:00:22,320 Second, thank you, Darrell. I'd be further discussion on the minutes and roll call 6 00:00:22,320 --> 00:00:24,500 Chris, in favor, Laura, in favor? 7 00:00:24,980 --> 00:00:25,300 In favor? 8 00:00:25,300 --> 00:00:25,540 In favor? 9 00:00:25,860 --> 00:00:26,680 Not in favor. 10 00:00:26,920 --> 00:00:28,320 And the chair is in favor. 11 00:00:28,760 --> 00:00:32,060 Or at first and only application this evening is a cycling review. 12 00:00:32,480 --> 00:00:34,920 So she has the special use for medical contracting yard. 13 00:00:35,580 --> 00:00:39,120 634 in the air state route 146 microclucosio. 14 00:00:39,220 --> 00:00:42,120 Applicants both need to structure each 12,000 square foot. 15 00:00:42,400 --> 00:00:44,960 One story building is 7.3 acres. 16 00:00:48,940 --> 00:00:52,600 Yeah, this is the first time their planning board will be reviewing the cycling. 17 00:00:52,600 --> 00:00:57,120 just to some background for the board and the members present this evening. 18 00:00:58,040 --> 00:01:03,740 For special use permits, the planning board's role is just to conduct a review of the 19 00:01:03,740 --> 00:01:07,720 site plan and to provide comments to the zoning board. 20 00:01:08,120 --> 00:01:14,100 The zoning board is the agency that will be reviewing the environmental aspects of the project 21 00:01:14,100 --> 00:01:18,480 and considering approval of the special use permit. 22 00:01:18,480 --> 00:01:25,380 So I just wanted to make that distinction and clarification in terms of what this board will be doing. 23 00:01:26,560 --> 00:01:29,420 This is a new application. 24 00:01:30,180 --> 00:01:35,640 There was a previously proposed contractors yard at this site in 2025. 25 00:01:36,700 --> 00:01:39,940 There was a different design engineer at that time as well. 26 00:01:40,020 --> 00:01:41,740 That application was withdrawn. 27 00:01:41,740 --> 00:01:48,080 We now have a new application for the same use, a new design engineer. 28 00:01:49,900 --> 00:01:53,660 I did discuss in the memo to the board. 29 00:01:54,740 --> 00:02:00,180 The changes that were made in this plan versus the 2025 plan. 30 00:02:00,600 --> 00:02:07,540 Notably, there is a proposed easement off-site for the driveway. 31 00:02:10,240 --> 00:02:16,380 The way out of the buildings has changed, there were some wetlands that were delineated 32 00:02:16,380 --> 00:02:19,840 in the 2025 plan, that should be included on this plan. 33 00:02:20,440 --> 00:02:25,960 We can get into some of those discussion points, but I first wanted to turn it over to 34 00:02:25,960 --> 00:02:28,560 Luigi Polesci from ABD engineers. 35 00:02:29,040 --> 00:02:31,740 They are the design engineer on this application. 36 00:02:33,140 --> 00:02:33,900 Thank you, Ken. 37 00:02:34,440 --> 00:02:35,100 Good evening. 38 00:02:35,100 --> 00:03:04,200 So yeah, as Ken mentioned, the Luigi Plus, with ABD engineers and surveyors, representatives in the applicant, Michael Falkusio, Michael Falkusio owns this property located here at 634, 146, it's a 7.27 acre parcel, it's zoned RA3, what he's looking to propose is a contractor yard which as Ken mentioned is an allowed use by a special use permit. 39 00:03:05,340 --> 00:03:11,480 As we laid it out, we're proposing a single curb cut off of 146. 40 00:03:11,820 --> 00:03:13,640 Ingress Andy Griss Heemleek. 41 00:03:13,740 --> 00:03:22,560 Ingress Andy Griss up on the, or that be the westerly end of the site, coming into the site 42 00:03:22,560 --> 00:03:28,680 and having a parking lot, and three proposed 12,000 square foot buildings. 43 00:03:29,400 --> 00:03:36,180 The way we've situated the buildings are along Route 146, which will help create a buffer 44 00:03:36,180 --> 00:03:45,300 on 146 and keeping all the parking and overhead doors on the opposite side of the street. 45 00:03:46,700 --> 00:03:51,540 As well as the overhead doors and parking that you see, we're also proposing some outdoor 46 00:03:51,540 --> 00:04:00,580 storage because a lot of these facilities, when they're contractor yards, you typically see 47 00:04:00,580 --> 00:04:02,180 outdoor storage with that. 48 00:04:02,580 --> 00:04:07,560 These contractors are your typical small tradesmen that may have some trailers and they 49 00:04:07,560 --> 00:04:11,800 need to park trailers out back on the outdoor storage areas. 50 00:04:14,000 --> 00:04:21,180 Utilities on site, we have access to water, as Ken mentioned, the property to the south, 51 00:04:21,180 --> 00:04:25,920 Mr. Fukuzio also owns that fronts out onto Weaver Street. 52 00:04:26,320 --> 00:04:31,360 There's public water on Weaver Street and back when there was a residential subdivision. 53 00:04:31,880 --> 00:04:37,320 There was an easement that was set up on this property to allow future extension of water. 54 00:04:38,080 --> 00:04:45,260 So water would be extended into this property to feed these buildings with public water. 55 00:04:45,260 --> 00:04:51,660 Obviously, no sewers, so we're proposing a septic system for three of the buildings. 56 00:04:53,260 --> 00:05:00,200 As mentioned in an narrative, you know, these contractor buildings will have bathrooms within it. 57 00:05:00,340 --> 00:05:02,080 So we need septic systems. 58 00:05:02,720 --> 00:05:06,820 The septic system will be designed for New York State Department of Health standards. 59 00:05:07,940 --> 00:05:14,400 And that's situated in the green space between the buildings and the road itself. 60 00:05:15,480 --> 00:05:24,120 To help soften the building landscape, we are proposing new ever green trees along the right of way. 61 00:05:24,920 --> 00:05:32,920 And that helps soften the alignment of where we have the buildings as you travel 146. 62 00:05:32,920 --> 00:05:40,760 And if you looked at the building architecture, this is a building that Mr. Fukuzu has already constructed in Rotterdam. 63 00:05:41,560 --> 00:05:50,440 And on the back side of these buildings facing 146 have some architectural features, so that it's not just a long-blank wall. 64 00:05:50,980 --> 00:05:57,060 It will have some windows that are actually having an author-fake. 65 00:05:57,060 --> 00:06:01,040 The real windows to actually allow natural light in, 66 00:06:01,140 --> 00:06:05,200 but also break up the facade of the building 67 00:06:05,200 --> 00:06:07,580 as you're traveling the 146 corridor. 68 00:06:08,940 --> 00:06:13,620 And the style of the buildings will have two colors to it 69 00:06:13,620 --> 00:06:15,860 as well, so it's not just one blank wall. 70 00:06:16,600 --> 00:06:18,740 And I believe those renderings are there 71 00:06:18,740 --> 00:06:19,880 that we can look at later. 72 00:06:20,980 --> 00:06:25,740 Back to the site plan features, we do understand that 73 00:06:25,740 --> 00:06:31,340 the easterly side, we have the black creek, and we are complying with the 100-foot set 74 00:06:31,340 --> 00:06:33,740 back from the black creek to any structure. 75 00:06:36,220 --> 00:06:39,180 As far as the storm water goes, everything 76 00:06:39,180 --> 00:06:44,600 does naturally drain to the black creek and what we're proposing are several storm water 77 00:06:44,600 --> 00:06:49,820 management areas along the easterly side and southern east side of the property, which 78 00:06:49,820 --> 00:06:57,500 will collect any of the rooftop water, parking lot water, and outdoor storage area, which 79 00:06:57,500 --> 00:07:04,180 will come into our proposed storm water management areas that need to meet near-state DEC requirements. 80 00:07:05,080 --> 00:07:12,420 Those will incorporate green infrastructure techniques, or likely proposing a what they 81 00:07:12,420 --> 00:07:20,760 bio-retention system, which has further filtering media, mulch plantings, so that as the storm 82 00:07:20,760 --> 00:07:26,320 water runoff comes off the site, it's going to go through the treatment for the storm water 83 00:07:26,320 --> 00:07:29,900 before it gets released out to the black creek. 84 00:07:30,270 --> 00:07:42,330 After looking at some of the comments, we do understand that's a concern. And as we develop our stormwater pollution prevention plan, we'll certainly keep that into consideration. 85 00:07:43,790 --> 00:08:00,150 Lighting will be kept to a minimum. We don't like a lot of light poles. We are proposing building mounted lights in this case. Those lights will be down type LED style, so that, you know, darks the guy compliance. 86 00:08:00,150 --> 00:08:01,910 so that they're not shining up. 87 00:08:02,330 --> 00:08:04,350 They're all shining downward. 88 00:08:07,670 --> 00:08:08,430 What else? 89 00:08:21,060 --> 00:08:25,120 Yeah, and as far as comparing to a previous site plan 90 00:08:25,120 --> 00:08:28,540 that was submitted, I did get the opportunity to look 91 00:08:28,540 --> 00:08:30,080 at that today. 92 00:08:31,440 --> 00:08:33,680 And as far as the proposed buildings 93 00:08:33,680 --> 00:08:37,740 that were proposed previously, they were proposing 94 00:08:37,740 --> 00:08:41,260 well over 36,000 square feet from what we're proposing. 95 00:08:41,260 --> 00:08:44,720 I think they were up to 40, 4,000 square feet. 96 00:08:45,780 --> 00:08:50,080 So looking at this plan and the way we configured it, 97 00:08:50,220 --> 00:08:54,460 we thought this was best for our first initial phase. 98 00:08:55,980 --> 00:09:02,260 Looking at how do we buffer from the road to the activity 99 00:09:02,260 --> 00:09:04,400 where the cars are going to be parked, 100 00:09:05,160 --> 00:09:09,080 as well as keeping it away from the black creek 101 00:09:09,080 --> 00:09:11,740 away from the neighbors as well. 102 00:09:13,840 --> 00:09:19,660 Again, back to the narrative, you know, this is RA3. We are here 103 00:09:19,660 --> 00:09:25,480 for a special use permit. We know we have to go to the ZBA. But, you know, when looking at this 104 00:09:25,480 --> 00:09:30,840 surrounding neighborhood, you have Stassett's landscaping right across the street, you have Phillips 105 00:09:30,840 --> 00:09:38,060 gas station and dunking in some convenience stores just Easterly from here. So, we feel that this 106 00:09:38,060 --> 00:09:46,300 maybe a good transition from like the heavier general business district to a lighter commercial 107 00:09:46,980 --> 00:09:53,560 in an agricultural setting, which, you know, when you look at these contractor yards, 108 00:09:54,320 --> 00:10:01,280 we feel that they have very, very little intensive uses than what could potentially be 109 00:10:01,280 --> 00:10:07,200 here. There are some uses that I looked at that are allowed in RA3 that would definitely be 110 00:10:07,900 --> 00:10:14,980 more intrusive than what we're proposing here. So yeah, we're here tonight, like Ken said, 111 00:10:15,060 --> 00:10:19,800 this is our initial submission. You know, we'd love to hear your feedback. We know we got a 112 00:10:19,800 --> 00:10:24,500 little bit more to go or a lot more to go here. But, you know, this was our initial thought, 113 00:10:24,500 --> 00:10:29,300 our concept and we'd love to hear your feedback in any other concern. So we can look forward 114 00:10:29,300 --> 00:10:32,820 to move forward. So, I'll turn it back over to the planning board. 115 00:10:37,370 --> 00:10:41,810 First question, Luigi, is the wetlands that were previously 116 00:10:41,810 --> 00:10:48,130 delineated. They're not on this plan. I was, why, you know, it's like you're gonna have a significant 117 00:10:49,390 --> 00:10:55,450 wetland impact. Yeah, my, you know, so that's a concern of ours. I'm not sure why they're 118 00:10:55,450 --> 00:11:00,630 not on this plan since it's already been delineated. They may need to be redone. Yeah, and that's 119 00:11:00,630 --> 00:11:05,770 going to get that. So we do know that we have to get out there and get a wetland biologist to 120 00:11:05,770 --> 00:11:13,010 read delineate these as you know in January 25 and March and whatnot, you know, the wetlands 121 00:11:13,010 --> 00:11:18,230 rules have changed. So, you know, we need to look at that. Now the state rules, the state 122 00:11:18,230 --> 00:11:19,150 states, the state rules, the state rules, the state rules, the state rules, the state rules. Yeah, 123 00:11:19,330 --> 00:11:24,010 under the current court, this goes before the state. Yeah, under the current court, right. Yeah, 124 00:11:24,010 --> 00:11:29,770 near is wetland. But yeah, we acknowledge that and we know we have to get a wetland biologist out 125 00:11:29,770 --> 00:11:35,450 the site because that's a I think a concern of ours is to try to limit any impacts on the 126 00:11:35,450 --> 00:11:42,750 wetlands and in the larger this complex becomes the bigger the impacts on the wetlands, 127 00:11:42,990 --> 00:11:49,950 the larger the larger the storage area becomes the larger you know if then you have certainly 128 00:11:49,950 --> 00:11:56,330 you know we would make a recommendation you know ultimately it's only board it's going to decide 129 00:11:56,330 --> 00:11:59,710 I would certainly keep wetland impacts to a minimum. 130 00:12:00,510 --> 00:12:01,750 That's a really close goal. 131 00:12:01,970 --> 00:12:05,570 And I'm guessing the way you're showing this now, 132 00:12:05,710 --> 00:12:08,550 you're over a tenth of an acre of wetland impacts here. 133 00:12:09,070 --> 00:12:11,210 Yeah, I really don't know where the wetlands are. 134 00:12:11,210 --> 00:12:14,350 I did walk this property in it to me and start to get wet 135 00:12:14,350 --> 00:12:15,990 as you got closer to Black Creek. 136 00:12:16,270 --> 00:12:19,030 There's a natural swell right in through here. 137 00:12:19,330 --> 00:12:19,530 OK. 138 00:12:19,530 --> 00:12:24,850 So you don't have the coverage that the previous consultant came up with. 139 00:12:24,850 --> 00:12:26,970 Yeah, your applicant didn't provide you that. 140 00:12:26,970 --> 00:12:28,010 I do see that. 141 00:12:28,270 --> 00:12:28,750 I do see that. 142 00:12:29,010 --> 00:12:29,210 Right. 143 00:12:29,770 --> 00:12:29,950 Yeah. 144 00:12:30,130 --> 00:12:35,350 Kind of loaded it on the web here and I pulled all the documents off of that. 145 00:12:35,990 --> 00:12:39,250 So yeah, we know we have to, you know, further the wetland study. 146 00:12:39,690 --> 00:12:44,890 I think, you know, just the size of it, you know, you're seeking a substantial area of variance. 147 00:12:45,850 --> 00:12:53,950 Setback variance, you know, which further increases the impacts on wetlands and storm water 148 00:12:53,950 --> 00:12:57,870 potential, water quality impacts, you know, this board while we don't 149 00:12:57,870 --> 00:13:03,410 open on variances, you might get something from this board that would say 150 00:13:03,410 --> 00:13:11,230 we'd rather you have a design that needs no area variance. Same thing with the 151 00:13:12,450 --> 00:13:16,850 the easement on to the residential property, you know, to me it seems like 152 00:13:16,850 --> 00:13:20,130 you're squeezing the orange pretty hard here, Luigi, and I'll try and 153 00:13:20,130 --> 00:13:30,930 get 36,000 square feet of structure on this parcel that isn't quite large enough to do it. 154 00:13:31,390 --> 00:13:37,490 So obviously if you read Kent's memo, this board is probably tabling this application 155 00:13:37,490 --> 00:13:43,690 obviously until we get further information, but that's another concern too, you're utilizing 156 00:13:43,690 --> 00:13:47,890 the joining, I was thinking myself, why doesn't he just, he's still owns it, why doesn't 157 00:13:47,890 --> 00:13:53,670 just modified a lot of lines, oh, it's already at the minimum three acres. You can't make 158 00:13:53,670 --> 00:13:59,430 that lot any smaller. So, you know what I'm getting at is really squeezing a lot in here, 159 00:13:59,530 --> 00:14:05,330 you know, if it was me, I'd be like, well, ship the driveway down, lose a building and call 160 00:14:05,330 --> 00:14:16,730 it a day and see what, you know, reduce the impacts on the wetlands, reduce the, you know, 161 00:14:16,730 --> 00:14:22,610 management, the size of the, that's very size of the, I guess you would reduce your storage 162 00:14:22,610 --> 00:14:27,910 lot by at least a third probably if you. But so I mean that's our concern. It seems like 163 00:14:27,910 --> 00:14:34,990 there's a lot being squeezed on here, you know, in any area of variance is, you know, you need 164 00:14:34,990 --> 00:14:41,690 to utilize an adjoining piece of property for an access easement. So I guess it's tough to get 165 00:14:41,690 --> 00:14:47,150 It's too far down the line here without, okay, where are you with your wetlands and packs, 166 00:14:48,550 --> 00:14:55,470 so on, you know, because I think this board would recommend that you certainly don't get 167 00:14:55,470 --> 00:14:59,970 into an individual permit, because I mean, that's your right, that's your right to try. 168 00:15:00,000 --> 00:15:31,360 I don't know what this is on board of appeals would say. Obviously, this is a permitted use, it's permitted, you know, it's an allowed use in this district. So some form of this use would move forward. It's just how big, how's it size, you know, I'm sure the one to limit the impacts on potential impacts to the water quality, et cetera. So that if you read Ken's memo, I mean, you know, I don't know. 169 00:15:31,380 --> 00:15:31,740 know, 170 00:15:34,710 --> 00:15:39,030 I could say the wetlands impact it's just seemed I didn't do a quick overlay, but it seemed 171 00:15:39,030 --> 00:15:43,850 like you, you know, you were certainly well over a tenth of an acre. Look that way. Now obviously 172 00:15:43,850 --> 00:15:50,310 you have to remap them. Yeah, we don't know where the wetlands are. You know, the reason why we put 173 00:15:50,310 --> 00:15:55,730 the building where we put it close to, you know, the other property that Mr. Fukuzio owns, you know, 174 00:15:55,910 --> 00:16:01,470 obviously both of those properties are zone the same. So if you have a building, the line is really 175 00:16:01,470 --> 00:16:06,490 imaginary because, you know, you could put the building, you could put the building on either 176 00:16:06,490 --> 00:16:07,270 of those properties. 177 00:16:07,330 --> 00:16:12,970 It's imaginary in a way, but not, I mean, you know, because it's basically the subdivision 178 00:16:14,230 --> 00:16:18,310 itself, you know, you stuff every piece of property that it could. 179 00:16:18,310 --> 00:16:20,430 You've got the three acres there, the bare minimum. 180 00:16:20,990 --> 00:16:27,430 If you wanted to do something this large in the future, maybe you should have saved some 181 00:16:27,430 --> 00:16:28,090 more property. 182 00:16:28,090 --> 00:16:35,310 But I realize you want to get the number of lots you want to get in there now. You got to use one of the lots to do the development on this part 183 00:16:35,310 --> 00:16:39,130 So because this part is not big enough to handle a little by itself 184 00:16:39,130 --> 00:16:44,770 The use you want to do and then that leads to potentially further impacts 185 00:16:45,470 --> 00:16:50,190 So that's just you know once again. I don't know you know that with 186 00:16:50,190 --> 00:16:56,930 And typically probably be our site plan recommendations, you know, would be to try to avoid 187 00:16:56,930 --> 00:17:05,130 the variances, avoid the encroachment onto the joining residential property, limit the 188 00:17:05,130 --> 00:17:09,330 the wet land impacts that I'd like, you know, be nice to have no wet land impacts, but 189 00:17:09,330 --> 00:17:16,210 I'm assuming you're going to have some that can hold up the previous still in the age. 190 00:17:16,210 --> 00:17:24,030 So this is the 2025 plan, so this shows the wetland area, which are these grayer hashmarked areas. 191 00:17:24,790 --> 00:17:31,910 So this is the area of the ingressy grass easement on the adjacent residential property. 192 00:17:32,630 --> 00:17:34,470 So I think there'd be impacts here. 193 00:17:35,030 --> 00:17:40,530 The highlighted orange area is the tenth of an acre impacts with their previous 194 00:17:40,530 --> 00:17:46,670 the middle, can use the middle. So this area are wetlands and then this area is wetlands. 195 00:17:46,710 --> 00:17:48,810 Plus the driveway entrance is wetland. 196 00:17:49,670 --> 00:17:54,830 Yeah. So the proposed wetland, I don't know what would be ultimately determined. 197 00:17:55,370 --> 00:18:02,010 So the proposed parking lot, I believe, comes back through this area when you look at it. 198 00:18:02,070 --> 00:18:06,710 So I think you're going to have definitely more than a tenth of an acre with these impacts, 199 00:18:06,710 --> 00:18:09,910 these impacts of potentially over here as well. 200 00:18:10,210 --> 00:18:16,490 We do so that kicks you into either the fee in lieu, wetland mitigation, 201 00:18:17,510 --> 00:18:20,970 more thorough review by Army Corps, just something to consider. 202 00:18:21,870 --> 00:18:22,150 Yeah, understood. 203 00:18:22,410 --> 00:18:24,610 We know we have to go through this process. 204 00:18:25,370 --> 00:18:28,010 Those wetlands could also be isolated, right? 205 00:18:28,090 --> 00:18:30,690 I mean, we don't know until we get a biologist out there. 206 00:18:31,150 --> 00:18:32,050 I don't know who did it before. 207 00:18:32,050 --> 00:18:35,770 But it was previously mapped and that was brought to this board. 208 00:18:35,770 --> 00:18:46,790 that license engineer as this is the wet land boundary, understood. So, you know, I can only assume it's going to be quite similar, 209 00:18:49,130 --> 00:18:57,610 but I don't know if there was ever in the file, I don't know if there ever was a JD letter or anything and I didn't think it got that far. 210 00:19:00,430 --> 00:19:06,310 There's been some issues raised, the potential historical impact stuff. 211 00:19:06,910 --> 00:19:11,010 So we would want to see a, of course, bondage from Shippo. 212 00:19:11,450 --> 00:19:11,510 Yeah. 213 00:19:11,690 --> 00:19:12,430 So we did something. 214 00:19:12,990 --> 00:19:13,050 Yes. 215 00:19:13,570 --> 00:19:18,350 And that automatically triggered that it was not an archeological, but I did read Ken's memo 216 00:19:18,350 --> 00:19:20,430 and, you know, a lot to look further into that. 217 00:19:20,510 --> 00:19:21,090 Yeah, no. 218 00:19:21,190 --> 00:19:22,570 I think I now talk to Ken. 219 00:19:22,670 --> 00:19:27,030 I don't know whether who submits the Chris on that, whether the town would submit it 220 00:19:27,030 --> 00:19:33,050 whether you would submit that, you know, that's something we can have a discussion about. 221 00:19:34,530 --> 00:19:40,570 Shippedo's Chris system really doesn't, it's not a catch all or everything, so just because 222 00:19:40,570 --> 00:19:46,090 there's not a check mark that gets generated from the EAF map for doesn't mean necessarily 223 00:19:46,090 --> 00:19:52,510 that there isn't something there that could be of significance. Based on the information that 224 00:19:52,510 --> 00:19:55,350 was provided, the historical context of it. 225 00:19:55,630 --> 00:19:59,130 I think it does rise to the level of, I would say, 226 00:19:59,410 --> 00:20:02,590 that the applicant should admit the application to Shippo. 227 00:20:04,850 --> 00:20:07,170 As you know, the first step is just their literature review, 228 00:20:07,230 --> 00:20:10,290 the phase one A, Shippo will then make a determination 229 00:20:10,290 --> 00:20:12,970 whether you need to do a phase one B in the shuttle fence. 230 00:20:13,890 --> 00:20:16,630 I think with that information, we'll have to provide it. 231 00:20:16,790 --> 00:20:18,910 So we'd be looking this board, obviously, 232 00:20:19,130 --> 00:20:21,190 as Ken said earlier, on the zoning board of appeals, 233 00:20:21,190 --> 00:20:23,790 So it's going to be the main body with this project. 234 00:20:24,390 --> 00:20:29,090 But before this board makes any recommendations on the site plan and design, and anything 235 00:20:29,090 --> 00:20:36,030 moving forward, we'd want a response from Chip Ball, we'd want the wetlands fully delineated. 236 00:20:36,450 --> 00:20:41,450 I guess I'll talk to the town engineer as far as stormwater, how far long that has to be, 237 00:20:41,570 --> 00:20:49,770 or has to get, but because ultimately we may make our recommendation on the site plan and 238 00:20:49,770 --> 00:20:55,570 BBA may or may not follow those recommendations, you know, let's get up to them. 239 00:20:57,030 --> 00:21:02,910 But I think generally we try to reduce the amount of potential impacts. 240 00:21:05,170 --> 00:21:12,630 So a little concerned about, you know, the amount of wet land impact, the variants 241 00:21:12,630 --> 00:21:19,790 is that I needed to fit the buildings in and the encroach went down to the residential property. 242 00:21:20,190 --> 00:21:27,510 I'll be it didn't tap against the loans that property, but to me it seems to indicate that 243 00:21:27,510 --> 00:21:37,770 we're kind of pushing the site pretty hard to get what you want to get in there, but I don't 244 00:21:39,150 --> 00:21:54,830 I mean, yeah, on the easement area, first I was going to wonder why you didn't just convey the land to this parcel, but I see why you're not because you're only three acres, so if you convey the land, you need a variance on that parcel, 245 00:21:55,650 --> 00:22:02,650 whereas here you need the variance for the rear setback, it kind of does seem out of place, you know. 246 00:22:03,530 --> 00:22:10,230 On the historic and archeology concert, you did the residential for Walden. 247 00:22:10,490 --> 00:22:12,170 This was part of the subdivision. 248 00:22:12,350 --> 00:22:14,230 Did you do consultation then? 249 00:22:14,750 --> 00:22:15,170 Yeah, we did. 250 00:22:15,790 --> 00:22:17,790 We did the shovel test and all that. 251 00:22:17,930 --> 00:22:19,010 I believe it was all good. 252 00:22:19,690 --> 00:22:19,730 Okay. 253 00:22:19,830 --> 00:22:28,950 So you may have the data documentation there, but the archeology may be addressable, but certainly 254 00:22:28,950 --> 00:22:29,590 the wetlands. 255 00:22:29,590 --> 00:22:29,970 This is kind of... 256 00:22:30,000 --> 00:22:40,620 Hard to review this plan without those wetlands, you know, to know whether or not it's a more of an impact than it really needs to be. 257 00:22:40,880 --> 00:22:56,660 There also is a floodplain. Now, it doesn't impact the huge amount of the property, but it may have some impact on those stormwater ponds, you know, if the sides and the berms of the stormwater need to have like fill going down the slope, 258 00:22:56,660 --> 00:23:04,800 You may be into that floodplain limit, so you may want to look into that, it's kind of a, it just into the property a little bit. 259 00:23:05,040 --> 00:23:07,800 May impact that gravel area, you know, significant. 260 00:23:13,620 --> 00:23:19,660 And no landscape, I know this is very early on in the project, but no landscape screening to the rear, 261 00:23:20,060 --> 00:23:27,700 it sounds like if you're putting in your stormwater management there, you're going to be clearing any trees or any woods that would be there. 262 00:23:27,700 --> 00:23:33,860 It's, you know, we'd probably be looking for, if it's not natural vegetation that's going 263 00:23:33,860 --> 00:23:39,860 to remain, you know, what do your plants for potentially screening, you know, and 264 00:23:39,860 --> 00:23:41,660 it's probably not propering a site. 265 00:23:41,800 --> 00:23:44,020 I don't have access down on the ways. 266 00:23:44,220 --> 00:23:45,960 I'm the southerly property line. 267 00:23:46,380 --> 00:23:49,660 I just didn't know, when you get into your stormwater management, you're going to be clearing 268 00:23:49,660 --> 00:23:50,740 those areas, right? 269 00:23:51,180 --> 00:23:53,280 Yeah, it's potentially correct. 270 00:23:53,680 --> 00:23:53,800 Yeah. 271 00:23:54,380 --> 00:23:57,580 So depending on exactly the footprint of the stormwater, we would be 272 00:23:57,580 --> 00:24:02,120 clearing, probably up to the property line, or possibly even a buffer, we could look 273 00:24:02,120 --> 00:24:04,880 at that as we further detail the design. 274 00:24:07,700 --> 00:24:13,440 Yeah, you'd want to screen all that for those back properties, like when just leave it 275 00:24:13,440 --> 00:24:18,600 open to be looking at a parking area and equipment that's just there. 276 00:24:19,180 --> 00:24:23,200 And then in the front, that's like a sound tunnel. 277 00:24:23,260 --> 00:24:27,980 When you come down that part of the road, the sound is almost unbearable. 278 00:24:27,980 --> 00:24:37,280 It's the weirdest thing having walked that property before, and that you're proposing six trees. 279 00:24:38,660 --> 00:24:46,620 Anything that could disrupt the way the sound comes off the highway would be strongly recommended. 280 00:24:47,240 --> 00:24:54,900 Like, what's the length that you have right now of frontage? How many feet is that? 281 00:24:54,900 --> 00:24:55,700 six hundred. 282 00:24:58,030 --> 00:25:06,190 It's over six hundred. Yes, and you have six trees and the, you know, maybe 283 00:25:07,750 --> 00:25:17,990 in a hundred years, the tree might be 40 feet wide. That's minimal at best, and you'd want 284 00:25:17,990 --> 00:25:27,090 to at least double large trees, but I would have a mix like because it takes a long time for things to 285 00:25:27,090 --> 00:25:35,150 So, the sound is, and I imagine people that live around there, they can attest to the noise that comes down on that road. 286 00:25:35,630 --> 00:25:38,210 Yeah, and I think that's one of the thoughts why we would put the buildings. 287 00:25:38,370 --> 00:25:39,590 No, the building itself. 288 00:25:40,310 --> 00:25:41,170 That'll help. 289 00:25:41,650 --> 00:25:41,690 That'll help. 290 00:25:41,690 --> 00:25:42,070 That'll help. 291 00:25:42,070 --> 00:25:42,090 That'll help. 292 00:25:42,110 --> 00:25:42,290 That'll help. 293 00:25:42,610 --> 00:25:43,130 That'll help. 294 00:25:48,510 --> 00:25:50,250 Certainly with black noise. 295 00:25:50,690 --> 00:25:51,290 Going to the back. 296 00:25:51,570 --> 00:25:53,610 Landscaping doesn't do much for noise. 297 00:25:53,610 --> 00:25:55,550 Yeah, but it does do 298 00:25:55,550 --> 00:25:56,750 Intraught visual 299 00:25:56,750 --> 00:25:58,210 Intraught wind 300 00:25:58,210 --> 00:26:00,290 But back to the landscaping 301 00:26:00,290 --> 00:26:03,070 I think we would be agreeable to 302 00:26:03,070 --> 00:26:08,630 Increasing the landscaping both in the front and the rear as we further detail is 303 00:26:09,630 --> 00:26:11,610 Yeah, we're not opposed to that 304 00:26:12,770 --> 00:26:15,270 Yeah, I mean, you know, this is a 305 00:26:16,210 --> 00:26:17,330 It's a 306 00:26:18,350 --> 00:26:22,810 Residential district, but it's an allowed special use I think that's a 307 00:26:22,810 --> 00:26:28,810 It is in a loud use, yes, but it is a special use permit, so that comes with a little bit extra 308 00:26:31,470 --> 00:26:36,350 Considerations of the use appropriately fitting, and yeah, obviously landscaping is something 309 00:26:36,350 --> 00:26:43,870 You know, and that not just on the front, but on the side as well, you know, the driveway being so far to the west 310 00:26:44,550 --> 00:26:49,840 Doesn't really leave you much to give kind of a muscle or to the cars heading eastbound 311 00:26:49,840 --> 00:26:57,860 found. And really, the residential property that you're on, the three-acre property, I guess 312 00:26:57,860 --> 00:27:02,280 the, you know, cold enforcement can take a look at this, but really, that property 313 00:27:02,280 --> 00:27:06,420 would need especially use, because you're not giving the property there, it's just an 314 00:27:06,420 --> 00:27:13,780 easement, so technically the parking lot is part of that parcel. So I think that's awkward, 315 00:27:14,260 --> 00:27:19,820 I know it's not just a side plan approval, it is especially used for me to approve. 316 00:27:19,820 --> 00:27:23,600 So, I mean, I think this board would lean towards recommending 317 00:27:23,600 --> 00:27:26,060 his stay out of that residential property. 318 00:27:26,060 --> 00:27:27,360 You avoid variances. 319 00:27:28,320 --> 00:27:30,320 Once again, I don't know what the zoning board 320 00:27:30,320 --> 00:27:32,480 of appeals is going to, you know, 321 00:27:33,260 --> 00:27:36,040 being as best used for me that it does, as Chris just said, 322 00:27:36,520 --> 00:27:39,740 some additional considerations that I think, 323 00:27:41,220 --> 00:27:43,700 at least we would make the recommendation. 324 00:27:44,240 --> 00:27:47,280 Yeah, so if you stay out of there and don't involve that parcel 325 00:27:47,280 --> 00:27:49,800 and don't involve the question of does that parcel 326 00:27:49,800 --> 00:27:56,860 the special use permit also, it would probably give you more room to either leave some buffer, 327 00:27:57,100 --> 00:28:01,960 leave some existing vegetation there that's at the edge of those wetlands, whether they're 328 00:28:01,960 --> 00:28:08,680 isolated or not, but especially for that eastbound traffic leaving out to them. That's the 329 00:28:08,680 --> 00:28:09,760 first thing you're going to see. 330 00:28:11,990 --> 00:28:17,270 Yeah, we can certainly soften the pavement. I think our initial 331 00:28:17,270 --> 00:28:23,290 thought I just squared it off but you know I have enough room to make the turn there 332 00:28:23,290 --> 00:28:28,530 from the driveway and so yeah maybe that triangular piece of pavement goes away those 333 00:28:28,530 --> 00:28:33,970 are things that you know as we do our grading and drainage plan you know we'll look at 334 00:28:33,970 --> 00:28:39,010 all of that but yeah it's a good point and right on this west side too is actually a national 335 00:28:39,010 --> 00:28:44,670 grid like sub station that but it's up to the property is coming right down there so it's 336 00:28:44,670 --> 00:28:48,470 very industrial looking at our substation right there. 337 00:28:48,870 --> 00:28:50,650 Can I make which is one more comment? 338 00:28:52,210 --> 00:28:56,870 You know, having read that even the mayor from water relief and all the concern from many 339 00:28:56,870 --> 00:29:03,130 people that live on the street are in Altsmont is that it is the black creek and that is 340 00:29:03,130 --> 00:29:05,690 our water source, like going into our water source. 341 00:29:07,090 --> 00:29:14,590 So to risk contamination because a diesel truck is being parked on some gravel seems 342 00:29:17,290 --> 00:29:24,630 It kind of like is, that's not like a trade-off, that's a good trade-off. 343 00:29:25,070 --> 00:29:32,230 You know, maybe if you're growing vegetables there, there might be a little more willingness 344 00:29:32,230 --> 00:29:39,830 to move, but to be risking to contaminate the surface of the soil that that is that close 345 00:29:39,830 --> 00:29:49,430 to the Black Creek, every concern should be really looked at and not take that risk, personally. 346 00:29:50,570 --> 00:29:51,750 That's my opinion. 347 00:29:52,150 --> 00:29:52,750 I drink that water. 348 00:29:53,290 --> 00:29:59,070 Yeah, we certainly respect a Black Creek with the storm water controls, meeting DEC requirements. 349 00:30:00,000 --> 00:30:24,300 We're going to be reviewed by town engineer. We'll certainly comply to that. We'll make sure, you know, whatever it is that comes off of this is treated with those biore attentions like that. That's one of the better treatments of a stormwater practice because, you know, you can line those so that it doesn't, you know, as it gets treated, it's not getting any groundwater, you know, it's controlled, right? 350 00:30:25,080 --> 00:30:30,980 Yeah, we've done a lot of facilities, we've done gas stations, we've done industrial parks, 351 00:30:31,740 --> 00:30:35,920 and a lot of those stormwater designs, you know, you do have to look at it a little bit 352 00:30:35,920 --> 00:30:36,300 differently. 353 00:30:36,540 --> 00:30:40,500 It's not like a stormwater practice for residential subdivision. 354 00:30:40,800 --> 00:30:48,000 So we're aware of that, you know, and we'll be cautious of it, of course, but, you know, 355 00:30:48,000 --> 00:31:06,240 Route 146, that crosses a black creek, you got Phillips gas station, gas station, that is there, you know, probably draining towards the creek too, and, you know, what we can do here, we can certainly design this to, you know, to be as best as possible for this type of use. 356 00:31:06,240 --> 00:31:13,160 So, it just, yeah, I mean it just seems like, you know, we're not going to get too far without the wet length on the A8 and response from your phone. 357 00:31:14,180 --> 00:31:21,260 But it seems maybe a little too much for the site. 358 00:31:21,560 --> 00:31:28,080 You know, to me it seems like you're saying, well maybe you can soften the turn and get it maybe. 359 00:31:28,380 --> 00:31:28,760 I don't know. 360 00:31:28,820 --> 00:31:32,740 I don't know how you keep 36,000 square feet of building there, Luigi. 361 00:31:33,000 --> 00:31:36,860 I mean maybe it just seems like because if we say, well, 362 00:31:36,860 --> 00:31:43,220 Well, if we make recreation, we feel like you really shouldn't be coming in for a substantial area of variance. 363 00:31:43,380 --> 00:31:50,820 What's all it's a hundred foot set back from the property line you're proposing about what 30 feet, so it's a substantial variance. 364 00:31:51,580 --> 00:32:04,060 So we won't, like I said, a pine on the variance, but we could say, the variance allows that much more building, which then allows that requires that much more 365 00:32:04,060 --> 00:32:07,640 Payment requires that much more storage parking lot 366 00:32:08,780 --> 00:32:14,940 Increases the impacts that much more on the wetlands and the potential impacts to the black creek 367 00:32:14,940 --> 00:32:22,540 So I think the size and the amount does start to play a role in the in the special use permit 368 00:32:22,540 --> 00:32:25,800 You know, we won't say whether they should you know 369 00:32:25,800 --> 00:32:30,140 Like I said, oh, you don't get into the variance. It's true. Other than we might say, you know 370 00:32:30,140 --> 00:32:32,760 We would recommend that no variance be needed 371 00:32:33,560 --> 00:32:37,360 And if that reduces the size, it reduces the size. 372 00:32:38,100 --> 00:32:41,160 It seems like you're trying to squeeze a lot on here. 373 00:32:41,580 --> 00:32:46,000 When you come in and you utilize an existing additional parcel 374 00:32:46,000 --> 00:32:47,460 and then you need a variance. 375 00:32:49,060 --> 00:32:51,980 I mean, it's trying to squeeze a lot on there. 376 00:32:52,120 --> 00:32:54,520 And then, of course, I can set the wetlands issues. 377 00:32:55,380 --> 00:33:00,580 That's going to dictate your design, obviously, to some degree. 378 00:33:00,580 --> 00:33:08,040 It seems to me that in and of itself I might reduce the size of what you're doing. 379 00:33:08,360 --> 00:33:09,540 Yeah, can I just jump in here? 380 00:33:09,860 --> 00:33:12,620 Yeah, so we know there's other options too. 381 00:33:12,820 --> 00:33:17,100 Like when we laid these buildings out, these are the buildings that were used in the Rotterdam facility. 382 00:33:17,520 --> 00:33:20,260 So like the shape of the buildings is what we're trying to use here. 383 00:33:20,660 --> 00:33:23,680 Keeping it up against the road and that's how we develop this, right? 384 00:33:24,040 --> 00:33:27,580 We can obviously look at different building shapes, right? 385 00:33:29,140 --> 00:33:34,120 So, you know, these are things that, you know, the applicant and I will certainly discuss, 386 00:33:34,340 --> 00:33:39,880 you know, we appreciate the feedback and, you know, I know we've got a ways to go here 387 00:33:39,880 --> 00:33:42,760 to massage this, like I said this was our first question. 388 00:33:42,760 --> 00:33:46,940 Yeah, the question is where you're coming in at the entrance that you're filling wetlands to create 389 00:33:46,940 --> 00:33:47,620 that entrance. 390 00:33:48,100 --> 00:33:54,100 At least previously mapped it, you know, to do that parking area down that swooping into the 391 00:33:54,100 --> 00:34:01,360 you're filling wetlands there, you're filling wetlands with the parking area and the additional 392 00:34:01,360 --> 00:34:12,240 outdoor storage area. So, it's, it just seems to me that he might be hard pressed to get 393 00:34:12,240 --> 00:34:14,400 this much on this site. 394 00:34:16,760 --> 00:34:21,880 But once again, we're going to wait to see what the, you know, the delineation 395 00:34:22,580 --> 00:34:32,540 You know, looks like you said it has been done previously, so the work is there, I don't know, I can't remember who did it, but 396 00:34:32,540 --> 00:34:35,320 Engels was the engineering firm, right? 397 00:34:37,320 --> 00:34:40,060 And, you know, when we would away, chip was response. 398 00:34:40,300 --> 00:34:47,740 It does, I would assume like with the subdivision there was some work done, so maybe a lot of that work has been done, 399 00:34:47,740 --> 00:34:52,860 but we would love to see what their response is. 400 00:34:55,220 --> 00:34:57,540 I think the key with the ship over response 401 00:34:57,540 --> 00:35:01,900 for the subdivision is they look at the area of potential effect. 402 00:35:03,280 --> 00:35:06,220 So at that time, the only area proposed for disturbance 403 00:35:06,220 --> 00:35:07,680 was off of Weaver Road. 404 00:35:09,400 --> 00:35:13,260 So they may have not taken a hard look at this area 405 00:35:13,260 --> 00:35:15,180 because nothing was proposed for disturbance. 406 00:35:15,180 --> 00:35:31,880 Yeah, I don't want to speak for them to submit it and see what their responses, I don't know what they ate, you know, what they can see how they can go back and look at it as they go back and look. 407 00:35:33,200 --> 00:35:37,400 Yeah, we understand, you know, we appreciate you here and us out tonight. 408 00:35:37,400 --> 00:35:42,300 And, you know, what I've been wanting to ask you is about the power lines that run in front of the site. 409 00:35:42,680 --> 00:35:46,560 Those power lines are pretty low. Have you looked at the height of those? 410 00:35:46,820 --> 00:35:51,380 And there's, there's a national grid that has a certain amount of equipment before residential cars going in and out. 411 00:35:51,420 --> 00:35:52,800 But I talk about commercial vehicles. 412 00:35:54,440 --> 00:35:56,980 And I mean, the substations down the roads. 413 00:35:57,180 --> 00:36:04,100 So I'm assuming these are pretty high power lines and distance and clearances from your equipment from those power lines. 414 00:36:04,240 --> 00:36:06,520 We'd also be concerned. You should look at it. 415 00:36:06,520 --> 00:36:09,980 We will. Yeah, there are certain requirements, 416 00:36:10,000 --> 00:36:15,440 height-wise to in order to cross underneath, you know, if the pole's got to be raised and that's 417 00:36:15,440 --> 00:36:19,620 something that you work with National Grid and you raise the poles to get the wires up. 418 00:36:20,300 --> 00:36:23,000 Yeah. Yeah. It's something that will have to be surveyed at the end of the day. 419 00:36:24,360 --> 00:36:26,800 Good thing. When I had the DEC Mapper, 420 00:36:27,000 --> 00:36:32,920 it triggered as rare plants and animals in this area. Yeah, I think it came up with the long-eared 421 00:36:32,920 --> 00:36:34,120 That's probably going to come up with that. 422 00:36:34,120 --> 00:36:35,040 Is that the one they're back? 423 00:36:36,080 --> 00:36:39,100 So then you, that trigger is a clearing sort of times a year. 424 00:36:42,670 --> 00:36:43,470 But that's my guess. 425 00:36:44,250 --> 00:36:44,370 Yeah. 426 00:36:44,630 --> 00:36:45,410 It would be the back. 427 00:36:46,090 --> 00:36:51,450 Because you have the hell of a burks and you have a hypernacular within a pretty 428 00:36:51,450 --> 00:36:52,630 Barrett close range. 429 00:36:52,770 --> 00:36:54,810 So that'll pick up in the secret real? 430 00:36:55,190 --> 00:36:55,590 It would be. 431 00:36:56,930 --> 00:37:01,810 Ultimately, a condition of approval, if the thing moves forward, that, you know, no clearing 432 00:37:01,810 --> 00:37:05,050 pace place between the, I don't know, what's the dates now? 433 00:37:05,230 --> 00:37:06,490 I don't have a date. 434 00:37:07,310 --> 00:37:09,190 Basically, for the summer months. 435 00:37:09,230 --> 00:37:09,410 The summer months. 436 00:37:09,470 --> 00:37:09,950 Never, I can't. 437 00:37:10,990 --> 00:37:11,310 Yeah. 438 00:37:11,310 --> 00:37:12,210 Now I did a good move to up to date. 439 00:37:12,290 --> 00:37:14,910 Mar, Jay, probably anything after Mar, Jay, probably after. 440 00:37:16,190 --> 00:37:17,230 So like, no, remember. 441 00:37:17,390 --> 00:37:20,370 Well, last question, your six inch water mean for bathrooms? 442 00:37:20,710 --> 00:37:22,030 Are you thinking something else? 443 00:37:23,130 --> 00:37:24,790 No, just for bathrooms. 444 00:37:26,130 --> 00:37:29,970 You know, we may have to get like, there may be a talk of extending the water. 445 00:37:34,360 --> 00:37:39,920 We're proposing six cents right now. That could change depending on the final layout. 446 00:37:40,260 --> 00:37:48,340 All of the months also reached out to us on a post we tap into this water line for the pump house, met with the mayor of all of the months. 447 00:37:49,420 --> 00:37:56,620 They would come in over Weaver as well, or they would bore in a black creek, but something that they're very interested in doing, they met a few times on site. 448 00:37:58,190 --> 00:38:00,810 So then it would be larger than six inches. 449 00:38:01,030 --> 00:38:05,430 It will, for us it wouldn't, for them it would be, but for us, that was just, you know, 450 00:38:05,450 --> 00:38:08,310 if you're coming across you might as well have more than less. 451 00:38:14,170 --> 00:38:14,410 Yeah. 452 00:38:14,630 --> 00:38:17,190 So you would need fire hydrants, right? 453 00:38:17,230 --> 00:38:18,010 At least one, right? 454 00:38:18,070 --> 00:38:18,430 Though we do. 455 00:38:18,630 --> 00:38:18,990 Yeah. 456 00:38:18,990 --> 00:38:20,510 I don't see one on the plans. 457 00:38:21,070 --> 00:38:21,410 But that's the right. 458 00:38:21,490 --> 00:38:23,790 That's something we'll have to work out with the player department. 459 00:38:23,870 --> 00:38:30,490 We have plenty of access around for vehicular and emergency maneuverability. 460 00:38:31,330 --> 00:38:36,370 And then, you know, the other thought too, you know, from other, the other facilities that 461 00:38:36,370 --> 00:38:41,730 we've designed, you know, these, these, these, buildings, you know, they're not proposed 462 00:38:41,730 --> 00:38:46,870 with loading docs, so like, I don't want people to think like, this is a main, like, heavy 463 00:38:46,870 --> 00:38:50,930 truck, generated tractor trailer in and out of here. 464 00:38:51,550 --> 00:38:56,110 They're occasionally may have a tractor trailer that comes in, and they typically just 465 00:38:56,110 --> 00:39:01,190 load to one of the tenants, and then they go right out. So I just wanted to get that clear 466 00:39:01,190 --> 00:39:06,430 that that's what, you know, the applicant from the other facilities that he currently has 467 00:39:07,730 --> 00:39:12,070 sees right now with his tenants. Like Luigi was saying earlier, like really, 468 00:39:12,570 --> 00:39:16,530 the guys that take these units are, it's a glorified storage unit, like you're getting the 469 00:39:16,530 --> 00:39:21,250 electricians, the plumbers that, you know, want a nice space with a bathroom and, you know, 470 00:39:21,250 --> 00:39:24,990 they're coming down the hill and that's where the little headquarters is, they stop in the morning, 471 00:39:24,990 --> 00:39:27,490 and they go to work, they come back, they stop, and they go home. 472 00:39:27,670 --> 00:39:28,490 That's what we've noticed. 473 00:39:29,150 --> 00:39:30,950 It's not a trucking facility. 474 00:39:33,990 --> 00:39:36,630 And the one, this is similar to what you have in Rotterdam. 475 00:39:36,770 --> 00:39:37,850 We have a few buildings. 476 00:39:38,350 --> 00:39:39,450 Yeah, quite a few of them in Rotterdam. 477 00:39:39,950 --> 00:39:42,870 Now, that's really our audience, it seems to be. 478 00:39:42,950 --> 00:39:44,750 Is that the one across from, what is it? 479 00:39:44,850 --> 00:39:46,990 The Hertz, is that built? 480 00:39:47,610 --> 00:39:51,290 The one that I remember seeing that. 481 00:39:51,290 --> 00:39:53,510 Third-extrient, first-extrient, first-extrient, first-extrient, 482 00:39:53,510 --> 00:39:55,610 Is that the joke? Is that constructed? 483 00:39:56,390 --> 00:39:58,450 It's completely built, yep. 484 00:39:58,590 --> 00:40:00,110 In occupied? Is that? 485 00:40:01,550 --> 00:40:01,870 So occupied? 486 00:40:02,770 --> 00:40:06,690 And there's actually two of those exact buildings on there. 487 00:40:09,800 --> 00:40:11,720 Yeah, and the photos that we submitted, 488 00:40:11,980 --> 00:40:17,140 the one photos of the, like, looking at the overhead doorside, 489 00:40:17,860 --> 00:40:20,160 that's actually from the Rotterdam facility. 490 00:40:21,700 --> 00:40:26,020 We didn't get a good photo shot of the side facing the road. 491 00:40:26,560 --> 00:40:31,020 Yeah, that's just a rendering so like this is the actual build that's actually not 492 00:40:31,020 --> 00:40:35,600 Rodium that's that is Rodium, but that's not the bird extreme that's that's another one in 493 00:40:35,600 --> 00:40:41,060 Consolacy we got like no numerous of these buildings now, but that is this also the exact same building 494 00:40:41,060 --> 00:40:42,080 It's the same building 495 00:40:42,660 --> 00:40:47,800 That's the rear of the building. No, that's the front of us. That's well, that depends what you call 496 00:40:48,680 --> 00:40:49,940 It's opposite of the road 497 00:40:49,940 --> 00:40:55,260 Yeah, that's inside on the black top right and then if you go to the next there's a small 498 00:40:55,260 --> 00:41:00,880 come from there. That's a rendering, and you can see same building colors, but then you've 499 00:41:00,880 --> 00:41:06,700 got the windows that are up high and the vertical features that break up that long fall. 500 00:41:09,480 --> 00:41:09,620 Yeah, 501 00:41:09,620 --> 00:41:14,700 I'm not sure why I came in as a smaller doctor. I don't like that. 502 00:41:28,720 --> 00:41:35,520 I don't know if I can do that or not. Not the best picture, but yeah. And we can provide 503 00:41:35,520 --> 00:41:40,860 actual photos, grass looks nice, nice grass. 504 00:41:42,260 --> 00:41:43,220 All right. 505 00:41:43,840 --> 00:41:44,200 So. 506 00:41:44,200 --> 00:41:44,460 Yes. 507 00:41:44,760 --> 00:41:45,460 Well, as you so. 508 00:41:45,840 --> 00:41:46,180 You can. 509 00:41:46,540 --> 00:41:47,920 Memo will be tabling this. 510 00:41:48,300 --> 00:41:49,820 This is not a public hearing. 511 00:41:50,420 --> 00:41:55,640 If someone has some brief comments, you know, they want to mention, you know, we'll 512 00:41:55,640 --> 00:41:57,360 certainly take some brief comments. 513 00:41:57,560 --> 00:42:00,620 As Ken said, the zoning board of appeals will be holding a public hearing. 514 00:42:01,180 --> 00:42:02,760 Maybe multiple public hearings. 515 00:42:03,620 --> 00:42:09,820 Sounds like these guys will be back in front of us a couple times before we make any kind 516 00:42:09,820 --> 00:42:17,900 of recommendation, but if you have a comment, the question, something will take some 517 00:42:17,900 --> 00:42:20,660 comment or question, something more. 518 00:42:21,180 --> 00:42:21,580 What's the other day? 519 00:42:21,600 --> 00:42:22,000 Well, okay. 520 00:42:22,340 --> 00:42:26,640 You approached the mic, so we picked up the minutes. 521 00:42:26,860 --> 00:42:27,480 Thank you. 522 00:42:27,660 --> 00:42:27,840 Yep. 523 00:42:32,830 --> 00:42:38,210 I just want to know the elevation from ground to peak of roof of the buildings. 524 00:42:38,390 --> 00:42:42,080 I am by around 2060. 525 00:42:51,700 --> 00:42:53,600 Any other comments? 526 00:43:06,250 --> 00:43:10,190 Hi, my name is Bill Miller, 46 year resident on Weaver Road. 527 00:43:11,490 --> 00:43:16,790 First thing I want to do is agree with Laura on the water pollution problem. 528 00:43:17,550 --> 00:43:22,310 I don't know the exact stats, but you put one core to motor oil in the ground. 529 00:43:22,310 --> 00:43:28,270 I believe it pollutes more than a couple of thousand gallons of groundwater, and for the board 530 00:43:28,270 --> 00:43:33,550 to ever approve this kind of thing without knowing who's back there, what's getting 531 00:43:33,550 --> 00:43:40,890 spilled in that ground would be a big misfortune to everybody in the town, and no matter 532 00:43:40,890 --> 00:43:46,610 how small the risk is, I don't think you could ever take it, and that's my main thing. 533 00:43:46,610 --> 00:43:54,050 The next thing I want to say is, you know, I noticed on the right up for this, it said that 534 00:43:54,050 --> 00:43:56,010 there wouldn't be an impact on other properties. 535 00:43:57,550 --> 00:44:02,250 Now, there's a residential house right on 146 across from this proposed development. 536 00:44:02,690 --> 00:44:05,190 That's certainly a big impact on that guy's property. 537 00:44:06,030 --> 00:44:11,110 Along with all the other houses on Weaver Road that are very close to this thing, there's 538 00:44:11,110 --> 00:44:17,490 One of the lost housing value, I don't even care if it's a thousand dollars, it's not fair 539 00:44:17,490 --> 00:44:22,810 that we're doing this applicant, a favor that he can put this in our neighborhood. 540 00:44:23,550 --> 00:44:25,730 It should no way be in this area. 541 00:44:26,370 --> 00:44:34,130 I know they call it a contractor yard, I call it an industrial park, it's gigantic, the storage 542 00:44:34,130 --> 00:44:35,470 for the vehicles. 543 00:44:35,470 --> 00:44:39,990 I counted around 120 on that map. It's totally ridiculous. 544 00:44:41,050 --> 00:44:43,510 Maybe 20 if you were going to approve it, 25. 545 00:44:44,170 --> 00:44:48,930 But why would he get 125 spaces to gigantic building? 546 00:44:49,390 --> 00:44:54,350 The buildings between the space in between them are around 720 feet. 547 00:44:54,490 --> 00:44:56,030 Just to make that clear if you look at the plan. 548 00:44:56,250 --> 00:44:59,870 It's obvious there's 20, 220 foot spaces and there are 230. 549 00:45:00,000 --> 00:45:29,980 So, it's like 700 and whatever fee. And when I first saw the plan, I couldn't even believe it. I was like, is this for real? Did somebody even ask to do this project? But, you know, then I was told anybody can ask for anything. And, you know, I'm not a good public speaker as you can probably tell, but I got it through all my two cents in here. And if this ever gets approved, I think it's utterly ridiculous. The Apple can's got plenty of places like this already. Why would the town, a killer, let him put another 550 00:45:29,980 --> 00:45:32,220 on an orary area, I think I said enough. 551 00:45:40,530 --> 00:45:40,950 Good evening. 552 00:45:41,510 --> 00:45:42,510 My name is Jeff Perley. 553 00:45:42,550 --> 00:45:44,610 I live at 1189 Burnout Mount Road. 554 00:45:44,990 --> 00:45:47,530 I also represent this area in the Albany County 555 00:45:47,530 --> 00:45:48,090 legislature. 556 00:45:49,410 --> 00:45:52,950 In terms of the Mr. Miller brought up the impact 557 00:45:52,950 --> 00:45:55,310 on neighboring properties, certainly. 558 00:45:56,070 --> 00:45:57,710 And he was a lot more articulate 559 00:45:57,710 --> 00:46:00,370 than you gave yourself credit for on the impact 560 00:46:00,370 --> 00:46:01,490 of the surrounding properties. 561 00:46:01,630 --> 00:46:05,030 But I would argue that if this development 562 00:46:05,030 --> 00:46:06,910 is allowed to go forward, it would impact 563 00:46:06,910 --> 00:46:09,750 every property from the Goldiland Center to Altima. 564 00:46:10,390 --> 00:46:15,870 And that's because if you drive out tonight and you look at the south side of Route 146, 565 00:46:17,070 --> 00:46:21,950 starting at the Getty Station in Goldiland Center all the way to the dentist's office in Altima, 566 00:46:22,250 --> 00:46:28,250 there is exactly one non-residential use in that entire stretch. It's almost three miles. 567 00:46:28,830 --> 00:46:35,230 Three miles, there is one non-residential use, and that's the Apple Inn, which is in an old historic 568 00:46:35,230 --> 00:46:38,730 in where the town was originated, right? 569 00:46:39,170 --> 00:46:42,850 So that area is very, very unique, right? 570 00:46:42,930 --> 00:46:46,370 The south side of 146 is entirely residential 571 00:46:46,370 --> 00:46:48,290 and entirely open space. 572 00:46:49,310 --> 00:46:51,290 The idea of having a contractors yard. 573 00:46:51,850 --> 00:46:53,610 Now at first, it struck me as odd 574 00:46:53,610 --> 00:46:55,890 that a contractors yard would be, and especially use, 575 00:46:55,890 --> 00:46:57,810 it's not an allowable use, it's a special use, 576 00:46:57,870 --> 00:47:00,150 so the criteria for special use has to be met, 577 00:47:00,510 --> 00:47:03,250 which is a, you know, not permitted use. 578 00:47:03,250 --> 00:47:06,870 It's a, you know, it is possible, that's right. 579 00:47:07,090 --> 00:47:09,670 That's how we are, you know, we can sit here and say, 580 00:47:09,870 --> 00:47:11,870 oh, we don't like this use, we're going to deny it. 581 00:47:11,950 --> 00:47:13,390 We recommend denial this use. 582 00:47:14,090 --> 00:47:16,550 We're going to apply it on the site, plan itself, you know, 583 00:47:16,730 --> 00:47:20,130 the size of the structure, the size of the parking area, 584 00:47:20,410 --> 00:47:21,590 so on and so forth. 585 00:47:22,330 --> 00:47:25,290 But it is, it's a permitted use in the zone, you know, 586 00:47:25,330 --> 00:47:27,450 so we're not, you know, we couldn't just say, 587 00:47:27,790 --> 00:47:29,830 well, we don't like it, you know. 588 00:47:29,830 --> 00:47:36,050 permitted if the criteria for the issuing of a special use permit is met, which is, you know, 589 00:47:36,810 --> 00:47:41,950 not that higher hurdle. Not that high, but one of it is that it's consistent with the master plan, right? 590 00:47:41,970 --> 00:47:48,830 And the master plan is spent a lot about protecting and buffering the unique hamlet aspects of 591 00:47:48,830 --> 00:47:51,170 of goodle and center and ultimate, right? 592 00:47:51,390 --> 00:47:53,790 And one of the things that provides that protection 593 00:47:53,790 --> 00:47:57,330 is the fact that the entire cell side of root 146 594 00:47:57,330 --> 00:47:58,850 from the Gedi and goodle and center, 595 00:47:59,010 --> 00:48:00,650 all the way to the dentist office and ultimate, 596 00:48:00,930 --> 00:48:03,550 is entirely residential and entirely open space. 597 00:48:04,010 --> 00:48:06,030 This would fundamentally change that. 598 00:48:06,050 --> 00:48:08,490 But the zoning controls, you know, I understand, 599 00:48:08,670 --> 00:48:11,710 and that's what struck me as odd that a contractor's yard 600 00:48:11,710 --> 00:48:14,970 would be even a special use within the RA3. 601 00:48:15,250 --> 00:48:16,250 When I first saw that, I'm like, 602 00:48:17,270 --> 00:48:22,150 We've brought it up that it seemed more like storage, maybe warehousing, we don't make that 603 00:48:22,150 --> 00:48:22,310 enter. 604 00:48:22,350 --> 00:48:25,850 No, I'm glad the board does not make that interpretation. 605 00:48:26,830 --> 00:48:30,110 Once that interpretation is made, our hands are tied. 606 00:48:30,510 --> 00:48:34,750 We can't say we don't like the use, but I think we have to work with the use and make our 607 00:48:34,750 --> 00:48:39,570 recommendation moving forward to mitigate any potential impact. 608 00:48:39,630 --> 00:48:45,250 And that's why, so it's a permitted use within the RA-3 district, but the RA-3 district 609 00:48:45,250 --> 00:48:52,590 is huge. So there's a lot of places where this type of use might be appropriate. I live up 610 00:48:52,590 --> 00:48:58,630 on the hill. But the Pollard family has a contractor yard off of Lisa-M Lane. It is buffered. 611 00:48:58,850 --> 00:49:04,970 It sits on, you don't even see it from Lisa-M Lane. It's not on Route 156. It's not on the main 612 00:49:04,970 --> 00:49:10,250 highway that everyone passes every single day. Mr. Wagner, who lives in that neighborhood, 613 00:49:10,750 --> 00:49:13,650 I think you might have a contractor yard. I don't know, he has a lot of heavier equipment. 614 00:49:13,650 --> 00:49:15,630 But I never see it, right? 615 00:49:16,010 --> 00:49:21,410 What he did is he actually graded and made his frontage along 146 beautiful, right? 616 00:49:21,630 --> 00:49:25,990 So I understand it, well, the first struck me is that a contractor yard would be a lot 617 00:49:25,990 --> 00:49:27,090 within the RA3. 618 00:49:27,670 --> 00:49:34,210 Obviously, the intent must have been where it is appropriate on some back roads, some side road, 619 00:49:34,430 --> 00:49:39,890 some thoroughfare that is not traveled, and is not the main entrance to our two most 620 00:49:39,890 --> 00:49:40,690 historic helmets. 621 00:49:40,690 --> 00:49:48,870 So I would say yes, I get it that it's a that it's a permitted use, but it doesn't necessarily have to be permitted in every parcel in the RA3 622 00:49:48,870 --> 00:49:53,730 We'd we would have a hard time saying no because of you know the location 623 00:49:53,730 --> 00:50:00,360 Understood, that's a zoning request. Well even I think even then they would have a hard time they could I've said we couldn't 624 00:50:01,450 --> 00:50:04,370 Look at the design look at the buff ring look at the screening 625 00:50:05,790 --> 00:50:08,190 But it's a loud, it's permitted. 626 00:50:08,870 --> 00:50:10,290 Now, it's permitted provided that there's not 627 00:50:10,290 --> 00:50:12,470 a negative impact on the surrounding properties, 628 00:50:12,590 --> 00:50:14,890 and provided it's consistent with the master plan. 629 00:50:15,290 --> 00:50:17,930 And I would argue that this type of use is key consistent. 630 00:50:18,590 --> 00:50:20,970 In case a lot of a thousand times, we just went through 631 00:50:20,970 --> 00:50:23,830 when people argued, you know, Costco wasn't appropriate. 632 00:50:24,550 --> 00:50:28,690 You know, it was a permitted choice, you know, 633 00:50:28,870 --> 00:50:31,870 in the zoning, and it's a loud, and, you know, 634 00:50:31,870 --> 00:50:37,670 If the zoning allows it, it's, you know, the zoning allows it if it's consistent with the master plan. 635 00:50:37,690 --> 00:50:41,230 But even if that, we really aren't the ones understood. 636 00:50:41,290 --> 00:50:43,310 Our board, it's really the ZBA. 637 00:50:43,410 --> 00:50:43,830 Understood. 638 00:50:43,830 --> 00:50:47,270 Who will review the criteria for meeting that special? 639 00:50:47,410 --> 00:50:55,490 So I understand you feel that the hurdle might actually be higher and that certain aesthetics should be met. 640 00:50:56,130 --> 00:50:58,730 So, but it would be the ZBA to go through those criteria. 641 00:50:58,730 --> 00:51:05,810 So, and I get where you're coming from as far as contractors yard, it was probably there 642 00:51:05,810 --> 00:51:11,250 from history because somebody had a business and put their backos and dump trucks in their 643 00:51:11,250 --> 00:51:15,090 backyard and contractors yard was kind of an accessory, it's a layering thing. 644 00:51:15,590 --> 00:51:20,770 This is different, possibly, but it's an argument really for the ZBA as far as those 645 00:51:20,770 --> 00:51:23,770 doesn't meet the merits and the definition. 646 00:51:24,670 --> 00:51:28,190 And I appreciate the differential between the zoning board and the planning board. 647 00:51:28,850 --> 00:51:34,290 And this is my last comment I would, in terms of a planning perspective, in terms of the master plan, 648 00:51:34,670 --> 00:51:42,390 I would urge you to please protect and acknowledge that specialness of the south side of U146. 649 00:51:43,990 --> 00:51:48,750 And you don't even think about it until you actually, actually today I wrote by it, I'm like, wow, 650 00:51:48,750 --> 00:51:57,450 there is from on the south side the only commercial use is the apple in right so that that is 651 00:51:57,450 --> 00:52:03,370 something that is very very unique very very special and something worthy of protection and 652 00:52:03,370 --> 00:52:08,710 and kind of a common on what you said because I thought it was really important that the the 653 00:52:08,710 --> 00:52:14,800 screening I was talking a little bit about like six trees just doesn't cut it and what you're 654 00:52:14,800 --> 00:52:22,740 Learning out is how important it would be if it is something that is owning a cruise that 655 00:52:22,740 --> 00:52:24,180 it could be better screened. 656 00:52:24,200 --> 00:52:28,960 There is plenty of space that all depends on how big the buildings are that you could make 657 00:52:28,960 --> 00:52:29,540 it disappear. 658 00:52:30,270 --> 00:52:58,270 You could. Yes. And you know, the principal, the master plan goes to great length, right? The, the specialness of the hamlet of gildal incentive, the specialness of the, of the village of altumont, right? Is a function of what surrounds it, right? It's not just what's in altumont or just what's in gildal incentive. It's how you approach both of those places, right? And you upload approach both of those densely designed places after coming through, 659 00:53:00,470 --> 00:53:03,810 area of extensive open space, right? 660 00:53:04,370 --> 00:53:07,430 This will change that and not for the better. 661 00:53:08,230 --> 00:53:08,950 Thank you. 662 00:53:14,930 --> 00:53:17,050 So, can you need a motion today? 663 00:53:17,390 --> 00:53:18,590 Just one more thing though. 664 00:53:18,590 --> 00:53:19,770 Just going back to the aesthetics. 665 00:53:20,170 --> 00:53:21,930 And I know you built these buildings before, 666 00:53:22,790 --> 00:53:25,990 and they're just black and kind of industrial looking. 667 00:53:26,170 --> 00:53:29,230 I think you need to go back and look at the architectural design of these. 668 00:53:29,550 --> 00:53:33,090 And look at saying, hey, can we make these more agricultural looking? 669 00:53:33,090 --> 00:53:42,130 Maybe more barn horse barn looking and some kind of facetism said pick up elements of a barn structure and not just these 670 00:53:42,890 --> 00:53:45,410 Metal brought these black dark buildings 671 00:53:46,890 --> 00:53:49,890 So I'd like to see that next time you come back in 672 00:53:49,890 --> 00:53:55,290 Especially since it's the rear of the building, you know and you don't have the front entrance 673 00:53:55,290 --> 00:54:03,010 So you know that makes a difference. Yeah, and I said there's windows here, but I think you make a look more agricultural and that fits in 674 00:54:03,090 --> 00:54:05,150 You might get a better response. 675 00:54:08,900 --> 00:54:09,820 My name is Dave Burke. 676 00:54:10,560 --> 00:54:13,140 I've been a resident of Gildelund for over 60 years. 677 00:54:13,620 --> 00:54:16,020 A resident of Altamon for over 30 years. 678 00:54:16,620 --> 00:54:19,260 But I'm also the president of the Stork Altamon. 679 00:54:19,420 --> 00:54:21,820 And I'm here tonight to speak on their behalf. 680 00:54:23,000 --> 00:54:25,220 Stork Altamon was established in 2018 681 00:54:25,220 --> 00:54:29,980 to promote and preserve the historical, cultural, and scenic beauty 682 00:54:29,980 --> 00:54:32,260 of the Altamon and Helldeburg area. 683 00:54:32,260 --> 00:54:39,760 The historic ultimate and the Mohawk Hudson Land Conservancy are working together to establish a greenway 684 00:54:39,760 --> 00:54:42,260 of protected land around Altamont. 685 00:54:42,840 --> 00:54:48,420 The viewshed of the Heldibergis Cartman, which provides this vital backdrop to Altamont, 686 00:54:48,680 --> 00:54:50,980 is a critical element of this greenway. 687 00:54:51,940 --> 00:54:58,500 The proposed contractor yard is within the greenway area that historic Altamont hopes to see protected. 688 00:54:58,500 --> 00:55:09,160 As one approaches Altamond and the Health of the Burgers Department, on Route 146, the existing view is a bucolic, green space and rolling terrain. 689 00:55:09,720 --> 00:55:14,400 These views welcome you to a very, very unique part of Gildelund. 690 00:55:15,380 --> 00:55:21,380 These special views first occur at the proposed contractor yard location. 691 00:55:21,380 --> 00:55:28,660 The new town of Gildelund Comprehensive Plan strongly states the importance of the 692 00:55:28,660 --> 00:55:35,040 Heldibern Viewshed and sites it as a factor to consider in potential development of lands 693 00:55:35,040 --> 00:55:36,500 in southwest Gildelund. 694 00:55:37,420 --> 00:55:43,840 In fact, historic Alchemond was asked by the town of Gildelund again to provide a letter 695 00:55:43,840 --> 00:55:49,560 of support for the town's efforts to develop a conservation overlay zoning district, to 696 00:55:49,560 --> 00:55:53,920 identified crucial view-sheds of the held-over discartment. 697 00:55:54,440 --> 00:55:57,140 This is an effort that historic ultimate strongly supports, 698 00:55:57,240 --> 00:56:00,320 and we gladly provided that letter of endorsement. 699 00:56:01,260 --> 00:56:04,920 This contractor Yark proposal would be within that conservation 700 00:56:04,920 --> 00:56:06,160 overlay district. 701 00:56:07,960 --> 00:56:10,660 The Albany County legislature also 702 00:56:10,660 --> 00:56:13,900 recognizes the significance of the held-over view-shed. 703 00:56:13,900 --> 00:56:21,900 Their resolution, number 384, in 2020, requested Albany County Planning Board pay particular 704 00:56:21,900 --> 00:56:26,620 attention to viewsheds and important views that pertain to the Heldibergis government 705 00:56:26,620 --> 00:56:30,720 and to consider the adverse impacts upon these views. 706 00:56:31,680 --> 00:56:36,700 So the public opinion is clear, and both the town and county agree, the Heldiberg 707 00:56:36,700 --> 00:56:43,000 U.S. are of great economic, historic, and cultural importance, and they need to be protected. 708 00:56:44,160 --> 00:56:52,080 I will add that this area is so unique that that's your park has been designated as a 709 00:56:52,080 --> 00:56:58,360 national natural landmark by the U.S. National Park Service, acknowledging that Southwest 710 00:56:58,360 --> 00:57:04,980 Gildelund is a special place and very deserving of protection. It is also important to note 711 00:57:04,980 --> 00:57:13,480 The proposed contractor yard site has also been identified by local historians as the burial place of American Revolution era of soldiers. 712 00:57:14,240 --> 00:57:19,760 Guildalins historical contributions to the Revolution should be promoted, not paved over. 713 00:57:21,040 --> 00:57:28,600 This proposed contractor yard would forever alter and diminish an important piece of the Hilbert Viewshed with large steel buildings, heavy equipment, 714 00:57:29,300 --> 00:57:34,000 and site conditions that are not compatible with the existing locations, scenic beauty. 715 00:57:34,000 --> 00:57:40,480 The planning board is clear that the proposal before you is not compatible with the town 716 00:57:40,480 --> 00:57:44,220 of Guildoo or Albany County's planting, planting goals. 717 00:57:45,040 --> 00:57:49,600 Historic ultimate strongly urges the Guildoo and Planning Board to consider the surrounding 718 00:57:49,600 --> 00:57:53,800 rural landscape and the historical grave sites when making your decision. 719 00:57:54,740 --> 00:58:00,460 Please help us protect this last remaining rural area of Guildoo and I thank you. 720 00:58:12,300 --> 00:58:21,300 Hi. My name is Colin Uniman. I previously submitted a letter to the public comment, which is up there, but I just wanted to point out a couple of concerns that I have. 721 00:58:21,620 --> 00:58:31,240 I know we touched on the environmental stuff and everybody's concerned about, you know, the appearance from 146, but my home is essentially at the end of this water. 722 00:58:31,240 --> 00:58:38,380 We said, right here, north facing, we live up 4-3-3-O-Ever row, and I also want 4-3-4-3-4-Ever 723 00:58:38,380 --> 00:58:41,060 row, which we rent out to our tenant. 724 00:58:42,800 --> 00:58:44,200 Essentially, this is my front yard. 725 00:58:44,620 --> 00:58:47,700 This is what I will be waking up and looking out to every single day. 726 00:58:48,040 --> 00:58:51,480 We kind of set up on a hill that looks down on this piece of property. 727 00:58:52,800 --> 00:58:59,480 And originally, when Mr. Fukuzi came in, he wanted to subdivide the division and put 728 00:58:59,480 --> 00:59:04,340 homes in there. We were all kind of like, oh, you know, really. But the more I thought about it, 729 00:59:04,420 --> 00:59:09,880 I thought that was a great idea. He had sold off the one lot down this way to the carotties, 730 00:59:09,980 --> 00:59:14,280 and they built a beautiful home on that lot. And I said, you know what, if they're going to put 731 00:59:14,280 --> 00:59:18,720 more homes like that, that's, that's great. We love our neighborhood. We love the people. We love 732 00:59:18,720 --> 00:59:27,180 kids. We like new neighbors and people coming in. This, in my opinion, is an eye sore. I'm not sure 733 00:59:27,180 --> 00:59:37,140 for a familiar with like the 146 158 weaver road intersection, but traffic right there on a normal 734 00:59:37,140 --> 00:59:43,200 given day is a nightmare. People coming in to get on the center to drop their kids to school, 735 00:59:43,220 --> 00:59:50,960 school buses, the gas station, people coming off of 148 or 158. A lot of times we noticed that weaver 736 00:59:50,960 --> 00:59:57,040 road is used as a cut-through. They come off of 146. They cut down weaver road. They bypass the 737 00:59:57,040 --> 00:59:59,400 58 in our section and they keep going. 738 00:59:59,580 --> 00:59:59,980 Expression. 739 01:00:00,000 --> 01:00:09,900 Currently during the school year, peak times 7 and 9, 3 and 5. It's insane, the traffic that happens there. 740 01:00:10,280 --> 01:00:22,640 My concern is that if you're going to add a contractor yard here with contractors that are coming and going at those same periods of time, the increase in traffic is just going to be insane. 741 01:00:22,640 --> 01:00:27,520 and it's going to increase the people that are cutting through, we've erode to avoid that intersection. 742 01:00:28,300 --> 01:00:34,080 And in all reality, it's dangerous. Cars come flying down our road. At that point, 743 01:00:34,360 --> 01:00:40,420 we have children, we have animals, we walk. There are no sidewalks. It is just a strip of road. 744 01:00:40,560 --> 01:00:47,560 There are no lines on our road. Normally, the people that usually travel are residents, but during 745 01:00:47,560 --> 01:00:51,680 the school year and during, like I said, the peak travel times, it's used as a cut-through. 746 01:00:51,680 --> 01:01:01,800 And if we're going to add, I don't know how many bays or how many contractors or how many people he intends to rent this out to, but it's going to increase the traffic significantly. 747 01:01:02,900 --> 01:01:19,420 I'm also concerned with the lighting. Like I said, our house sits up on a hill. I look out my front window. This is what I'm going to see where there will be lights on 24 hours a day, because that's going to impact, you know, my property and what I look at every single day. 748 01:01:19,420 --> 01:01:21,460 I'm also concerned with the sound. 749 01:01:21,840 --> 01:01:23,660 You know, you're going to be renting two 750 01:01:23,660 --> 01:01:25,380 Carpenters, electricians 751 01:01:25,380 --> 01:01:29,100 Who's to say that a Carpenter isn't going to be working in their late one night? 752 01:01:29,180 --> 01:01:31,500 You know, we come from a blue collar family. My husband's a landscaper. 753 01:01:32,220 --> 01:01:33,680 Sometimes he works late at night. 754 01:01:34,300 --> 01:01:37,860 So, you know, who's to say that a Comforter is not going to come back from a job at 755 01:01:37,860 --> 01:01:41,580 5, 6, 7 o'clock at night and want to do some work in his shop. 756 01:01:41,640 --> 01:01:44,420 So, now I'm going to listen to saws all night long 757 01:01:44,900 --> 01:01:47,640 Or, you know, vehicles moving around 758 01:01:48,480 --> 01:01:55,540 I also would like to know if there's going to be any, like, regulations as to who is renting 759 01:01:55,540 --> 01:01:56,340 these places. 760 01:01:56,920 --> 01:02:01,120 Like, you know, we're talking about parking a truck in the parking lot, but, you know, contractors 761 01:02:01,120 --> 01:02:02,480 have tractors. 762 01:02:02,660 --> 01:02:03,600 They have excavators. 763 01:02:03,700 --> 01:02:04,780 They have backels. 764 01:02:04,820 --> 01:02:09,880 They have all kinds of equipment that they're going to be parking in these parking lots that 765 01:02:09,880 --> 01:02:12,640 are just going to be leaking fluids. 766 01:02:12,800 --> 01:02:17,140 They're going to be making noise every time you fire up one of those pieces of equipment. 767 01:02:17,140 --> 01:02:26,380 You know, like, it just, it doesn't make sense to me that anybody would think that this was a good place for something like this. 768 01:02:27,180 --> 01:02:30,400 I understand the contract you are. I understand it. It's a great concept. 769 01:02:30,580 --> 01:02:38,360 I think that it's necessary for blue collar workers, but I just don't think that this is an appropriate location for something like that. 770 01:02:39,600 --> 01:02:47,120 So unless there's going to be some sort of like regulations put in place as to who gets to rent here and what they get to do 771 01:02:47,120 --> 01:02:52,520 and the hours they get to operate I just don't I don't see it as a good idea and I just wanted 772 01:02:52,520 --> 01:02:56,620 to put that on record and like I said I already submitted a letter but I just wanted to speak 773 01:02:56,620 --> 01:03:01,460 my piece and I think I speak for all of my neighbors on Weaver Road. Every single person that 774 01:03:01,460 --> 01:03:09,340 resides in that area nobody supports this. Nobody wants this at all. I'd also like to mention 775 01:03:09,340 --> 01:03:15,080 that that beautiful house that built was just sold within the past I think maybe two or three months 776 01:03:15,080 --> 01:03:23,780 And I don't think that that person that's to paid $1.25 million dollars for that home has any idea that this is going to be in their backyard. 777 01:03:24,820 --> 01:03:30,320 And that to me is a very, very big interest for that person. Thank you. 778 01:03:30,440 --> 01:03:31,200 All right. 779 01:03:36,140 --> 01:03:38,220 So we'll table this can. 780 01:03:41,100 --> 01:03:41,360 Okay. 781 01:03:42,580 --> 01:03:47,720 You have some other, because I don't want, we seem to be arguing the use and it's something... 782 01:03:51,140 --> 01:04:03,120 I'll be brief. I support all the concerns that have just been expressed between what are quality. 783 01:04:05,080 --> 01:04:10,520 These folks live in a neighborhood which are comprehensive plain as less than a year old. 784 01:04:10,840 --> 01:04:13,320 Their neighborhood deserves to be protected as well. 785 01:04:14,600 --> 01:04:24,420 So, I'm going to give Ken seven pages here of petition with signatures and the last page 786 01:04:24,420 --> 01:04:25,800 seven is actually blank. 787 01:04:26,760 --> 01:04:31,200 So, we're going to share this as well with you. 788 01:04:32,000 --> 01:04:38,120 We'll send a copy also to the ZBA because they're going to be making the final decision 789 01:04:38,120 --> 01:04:41,360 here and also to the Albany County Planning Board. 790 01:04:41,780 --> 01:04:50,020 So, soon, the blank page in the back will no longer be blank, so we're going to continue getting more signatures. 791 01:05:02,260 --> 01:05:04,540 Just table, you don't need a motion to table, right? 792 01:05:04,620 --> 01:05:04,980 No. 793 01:05:04,980 --> 01:05:06,500 No motion to table. 794 01:05:07,780 --> 01:05:10,180 So, will you do you get an idea of what we're looking for? 795 01:05:10,380 --> 01:05:12,680 Yes, thank you. 796 01:05:12,820 --> 01:05:16,880 So, we're going to need all that information for you to come back in. 797 01:05:19,700 --> 01:05:22,620 Like I said, I think our, you know, our comments were, 798 01:05:22,620 --> 01:05:32,640 The site plan, the need for variants is the approaching on the joining residential property, 799 01:05:32,920 --> 01:05:38,480 the size of the outdoor storage, all those things are concerns of ours regarding this 800 01:05:38,480 --> 01:05:39,920 site plan itself. 801 01:05:41,720 --> 01:05:42,200 Okay. 802 01:05:43,300 --> 01:05:44,540 Thank you. 803 01:05:47,000 --> 01:05:47,500 What is it? 804 01:05:48,560 --> 01:05:49,440 So it's still need a motion. 805 01:05:49,940 --> 01:05:50,720 So we'll table it. 806 01:05:51,160 --> 01:05:51,460 Correct. 807 01:05:52,020 --> 01:05:53,400 Next meeting is what? 808 01:05:53,420 --> 01:05:54,380 Two weeks. 809 01:05:54,380 --> 01:05:56,660 There was October night, I think. 810 01:05:57,040 --> 01:05:57,300 Is that there? 811 01:05:57,420 --> 01:05:57,780 No. 812 01:05:57,960 --> 01:05:58,780 No, no, no. 813 01:05:59,100 --> 01:05:59,840 I'm sorry. 814 01:05:59,940 --> 01:06:00,340 You got one. 815 01:06:00,800 --> 01:06:02,200 September 23rd. 816 01:06:02,460 --> 01:06:03,660 September 23rd. 817 01:06:04,480 --> 01:06:04,640 Yeah. 818 01:06:05,480 --> 01:06:06,220 You're way off. 819 01:06:07,100 --> 01:06:16,900 Yeah, it's what it's not summer hours, all right, it's not summer hours. So September 23rd. Yeah, all right. Can I get a motion to adjourn? Motion? 820 01:06:17,400 --> 01:06:20,220 Second. I'll second. All right. I'll favor I. 821 01:06:20,240 --> 01:06:22,260 Thank you so much. All right. Yeah.