[2:58] Good afternoon everybody. >> Welcome to the Gulf Shore City Council [3:03] work session meeting of April the 6th. We appreciate you being here. Uh this is [3:08] the meeting where for those of you that are not typically with us, this is where [3:12] we talk about items that will be on the agenda next Monday for voting. And this [3:18] is where we get to listen to your questions, your input, and any comments [3:21] you want us to know as we proceed forward to consider these these [3:25] different agendas or proclamations or whatever. So, please be uh raise your [3:31] hand and be anxious to communicate with us. We want to hear from you. This is [3:35] your opportunity. We're going to start tonight with a presentation. We have [3:39] here representing GSores in the Miss Senior Alabama Pageant, Miss Cheryl [3:43] Richie. Cheryl, will you explain to us a little bit about what what you're doing? [3:48] » Thank you so much for having me today. I truly appreciate it. Um, on March the [3:53] 17th, I had the distinct pleasure of being crowned Miss Senior Gulf Shores [3:56] 2026 by the Miss Senior Alabama organization. It is an honor to be here [4:03] and represent our city throughout the state. This is a pageant that has been [4:07] in existence since 1987, um, which I wasn't a senior at that [4:12] point in time. Uh we have two different categories. Uh Miss Senior Alabama and [4:16] Miss Super Senior Alabama. That's from age 60 to 69 is the senior and from age [4:21] 70 and above is uh the super seniors. Um our sole purpose is to encourage women [4:28] over the age of 60 to share their experience and their wisdom within their [4:32] communities. So many times people hit the age of 60 and they forget that they [4:37] have purpose and most of the time their purpose is really just now starting. So [4:41] our organization carries around the state the message of please remember [4:46] your purpose and remember that you have one and that your experience and wisdom [4:50] can support that in your community. Each year the winner as Miss Senior Alabama [4:56] um takes their platform to the state and I'm excited to take our city out to the [5:03] state and represent you guys. Um I was also many of you know me personally. [5:08] I've been involved in this community. We have been here since 1992. We've played [5:11] every sport that there is. I've raised three children here within this [5:15] community. Love this community and I'm very excited to be representing it. But [5:20] I wanted to come and share with the city what the pageant was and that we do have [5:24] an opportunity to shine throughout the city and that I'm looking forward to [5:28] representing you guys. >> Thank you, Cheryl. Cheryl's father was a [5:32] coun set up here for a period of time. Mr. [5:35] » He ran against a couple of you. I don't think he ever got it, but Steve, Steve [5:39] and Jason know my dad well, >> and I knew him well, too. So, [5:43] » yes. >> Thank you very much and congratulations. [5:45] Can we get a photo? >> Yes, I would love a photo. Thank you so [5:48] much, >> council. [5:59] » Oh, good. You're great. Marketing guy. [6:12] I didn't take a picture of this too with her phone. [6:19] » Three, two, one. [6:25] » Thank you. [6:33] Absolutely. [6:47] » Ready? Huh? >> Yeah. [6:53] » Next on the agenda, we have a proclamation on sexual assault awareness [6:58] month for April 2026. And Jennifer, Council of Woman Guthrie is going to [7:03] read it for us. >> Absolutely. [7:05] Um, and is Micah with the lighthouse here, too? Oh, there you are, Micah. [7:09] » Hi. >> Well, I'll read the proclamation and [7:11] then I'll join me down there. Okay. >> Um, okay. So, whereas according to the [7:16] Rape, Abuse, and Incest National Network, RAIN, every 68 seconds, an [7:21] American is sexually assaulted, and every nine minutes that victim is a [7:25] child. only 25 out of every 1,000 perpetrators will end up in prison. And [7:31] whereas only 310 out of every thousand sexual assaults are reported to police, [7:37] meaning that more than two out of three go unreported. And whereas the most [7:42] important thing we can do for our victims is believe them and support [7:45] them. And whereas National Sexual Assault Awareness Month seeks to raise [7:50] awareness, find solutions, and foster community involvement, as well as to [7:55] remember survivors of sexual assault and offer tribute to all victims of sexual [7:59] assault throughout America each year. And whereas the effects of sexual [8:04] assault are felt by the entire community, requiring all to join [8:08] together to take action to create a safer environment for everyone. [8:12] And whereas the city of Gulf Shores commends the lighthouse for encouraging [8:17] all citizens to become more aware of sexual assault and for remaining strong [8:21] and persistent advocates toward the support of all victims of such terrible [8:25] acts. And now therefore, on behalf of Mayor Craft and the fellow council [8:30] members of the city of Gulf Shores, I do hereby proclaim April 2026 as sexual [8:35] assault awareness month in the city of Gulf Shores, Alabama. call upon all [8:39] residents, businesses, and organizations to join in raising awareness, supporting [8:44] survivors, and working together to prevent sexual assault in our community. [8:50] Thank you so much. Um, good evening and thank you for recognizing sexual assault [8:56] awareness month. Um, the lighthouse is very grateful for this recognition. This [9:01] proclamation is more than words. It shines a light on a crime that often [9:05] lives in silence and it sends a powerful message to victims and survivors. You [9:10] are seen. You are supported. And you are not alone. Through the services provided [9:15] at the Lighthouse, we stand alongside survivors every step of the way, [9:18] offering a 24-hour crisis line, hospital accompaniment, counseling, support [9:24] groups, and court advocacy. We're honored to serve individuals and [9:28] families across Baldwin and Escambia counties, walking with them on their [9:32] path towards healing. Thank you for your support and helping us bring awareness, [9:36] hope, and compassion to our community. >> Micah, can you tell us a little bit [9:41] about Teal Tuesdays? >> So, um, Teal Tuesday, we are asking for [9:48] everyone in the community to wear Teal just to help bring awareness to sexual [9:52] assault and to support those victims. And it's going to be April 7th is the [9:57] day that we're we're asking everybody to show that support. So tomorrow [10:04] this to you [10:50] Thank you, Jim. Next item on the list, uh, Assistant [10:55] City Administrator Lee Jones has got several issues to go over with us [10:59] tonight. Mr. Jones, >> good afternoon, Mayor and Council. Um, I [11:03] have been asked to talk fast given the length of today's agenda, but I I don't [11:09] really feel like talking fast, but I have consolidated four items into two, [11:13] so hopefully that will make things move along quickly. Um, the first item on the [11:19] agenda, the font is really messed up. Um, not sure how that happened, but it's [11:25] legible. So, um, the first item on the agenda is a request to accept a proposal [11:31] from Innerboroough Partners LLC, uh, to create a comprehensive plan for the city [11:36] and to allow the the mayor to negotiate and accept and execute a professional [11:41] services contract with Inner Bureau, an amount not to exceed $500,000. [11:47] Your agenda item summary in your packet uh was incorrect. the account where we [11:52] were pulling this this uh money for the comp plan for. Um John informed me that [11:58] he actually budgeted $300,000 and uh the capital fund uh fund 38 um [12:05] for 2026. So it won't be coming from our consulting services. it will be coming [12:10] from fund 38 um with an additional 200,000 uh in 2027. Since this is [12:17] spanning uh both 2026 and 2027, uh we're requesting $300,000 this year [12:24] and then 200,000 in the following year. Uh the comp plan is a long-term policy [12:30] document. that will serve as a guide for both public and private actions and [12:35] decisions that will help ensure quality and measured development in line with [12:39] the community's vision. And uh that was a key component of this was making sure [12:44] that we had really broad um uh public engagement throughout the life of the [12:50] plan. Inter Partners is is well known in planning circles for their creative um [12:57] uh public engagement uh expertise and and the way that they go about getting [13:03] input from communities. Um so this is not just your typical comp plan in that [13:09] we we put together a very specific RFP last year before it went out and we [13:15] asked for these elements that were kind of over and above what you typically [13:18] find in a comp plan. The first is what's called a public engagement plan or a [13:22] PEP. Um at the very outset of this project, they will develop a plan for [13:28] how best to engage our community unique to the city of Gulf Shores. Um we also [13:34] uh required a market study. So several of the teams didn't have an economist on [13:39] their team. Innerboroough's team does have an economist. uh he's worked on [13:43] dozens of of comprehensive plans, but we're going to do a a full-blown [13:48] citywide uh market study as part of the comprehensive plan. And and while we do [13:53] have um several elements that make up our current master plan for the city, we [13:58] don't have a consolidated comprehensive plan. So, this will be the first time [14:03] for us to develop a baseline assessment of our community, our profile. Um so we [14:09] wanted to make sure that that was uh the intent of this plan. Also a detailed [14:14] multimmodal transportation plan. We have a major street plan that is built on [14:19] federal highway commission um requirements for arterials collectors [14:24] local roads. It's all uh it's all about moving cars. We have one of those. But [14:29] the multimmodal transportation plan is all about moving people. So, we wanted [14:32] to make sure that the the the respondents knew that we wanted [14:36] something that was more than just about focused on automobiles. Uh, we also [14:41] included the draft vision 2035 plan in the RFP. So, they knew we weren't [14:47] starting from ground zero. We've done a lot of community engagement to get the [14:51] core values and the goals of our 2035 plan set. So, they will be building on [14:56] that effort as well. and also uh something that we could translate easily [15:01] into small area plans as well as as zoning. So we don't want this plan to [15:05] sit on a a shelf. U we want to make sure that it's easily transferable into [15:11] zoning and other more detailed small area plans. And finally we requested a [15:16] detailed implementation plan. We don't want it to sit on the shelf. We want to [15:20] make sure that we can take the recommendations from this plan and [15:23] implement them over time. Uh just a brief timeline of the process for this [15:28] decision. In December of 2025, we did put out an RFP across multiple uh [15:34] national uh channels uh Planet Edison, APA, um several different websites where [15:42] this RFP went out. We closed acceptance of uh proposals from qualified firms. on [15:48] February 13th of this year, we received 12 proposals uh from teams across the [15:54] country and I think it's a testament to and and in the interviews we heard from [15:59] folks they just people really want to work here in the city of Gulf Shores. I [16:02] was um I was overwhelmed by the quality of the subittles that we received from [16:10] nationally recognized firms and teams all who wanted to work here in Gulf [16:15] Shores because of of what we have to offer. Um the week of February 16th, the [16:21] the selection committee scored the proposal. You can't see the list of [16:25] folks on the selection committee, but it's made up of members of the executive [16:30] department as well as department heads. Uh February 27th, we met and talked [16:35] through our scores and we selected four of the 12 teams to interview. And then [16:41] on March 12th and 13th out at the Eco Center, we held interviews for the four [16:45] selected firms. After all the teams interviewed um we met and unanimously [16:51] selected Intera Partners team um to uh develop the comprehensive plan for the [16:56] city. They stood out among the other teams both because they were very [17:00] personable. They were easy to talk to. They answered our questions really well. [17:04] Seemed like a group of folks that we could uh relate to and work with, but [17:08] also they brought in a team of experts um that focused on each element of the [17:14] plan. So all of these uh different firms have worked together on plans in the [17:19] past. Um but they are all nationally recognized experts in their fields uh [17:24] for these different comprehensive plan elements. Um there's six different [17:28] elements of the comp plan. I'm I'm skipping task six in Interro's approach. [17:33] Um the first five ta tasks are inventory and developing the market study, uh the [17:40] public engagement plan, all those things. I won't go into those in detail, [17:43] but I did want to focus on the six core plan elements, which are land use, [17:48] housing, urban design, the mobility plan, environmental resilience, and [17:52] economic development. Code studio is a team member that will [17:57] lead uh the land use component of the plan. And again, all of these plans work [18:03] uh with each other. They're not done in silos. these these firms that are [18:07] leading these different elements of the plan will be working together so that [18:12] the land use and mobility or and economic development are all talking to [18:16] one another and they'll all be interacting as they develop these [18:19] different elements. But Code Studio is a national leader in zoning and formbbased [18:26] codes. Um, so seeing them a as one of the uh the leaders of of the the land [18:33] use element was was great for us. They will set this up to be easily translated [18:39] into small area plans andor zoning as we move forward from policy to [18:46] implementation on this. Uh the second element is housing. Inter will be [18:50] leading this with help from Randy Gross uh economics, you know, looking at where [18:55] the gaps in our housing market are, locations, different housing types, how [19:00] much housing, you know, we have um a new school system that we we are very [19:05] concerned about overburdening as well as our transportation system. So um where [19:10] where are we going to get the most out of our housing and what types of housing [19:15] and what's the form of that housing uh will be uh the goal of the housing [19:19] element. Third is the urban design element. Um so this will be looking at [19:24] existing conditions for our streets, parks, civic spaces, uh waterfronts and [19:31] then providing additional opportunities for uh new civic spaces, uh new streets, [19:39] uh new parks um will all be the the urban design element. Multimodal [19:44] mobility uh that will be done by Tool Design. Tool is based in Maryland, but [19:49] they have offices all over the country. they are a leading expert not just in [19:54] moving cars but moving people. So they'll be focused on um uh we've had a [20:00] lot uh this year with with ebikes. So they'll be drilling down into what our [20:06] existing ordinances say, but also what are best practices nationally, what's [20:11] best for the city of Gulf Shores as far as um policies and regulations for [20:15] ebikes, golf carts, um our trail networks, you know, missing sidewalk [20:21] gaps, um transit to school, uh transit to and from the airport. So um they're [20:27] really going to give us a a deep dive into uh mobility within the community. [20:33] Wagner and Ball is a multid-disciplinary firm uh based in New Orleans. They're [20:39] going to be looking at um our uh storm water ordinance um or lack thereof, [20:45] Jenny. Um uh and um and how we can improve our storm water ordinance, how [20:52] we can make the most of our parks and open spaces as far as resilience. [20:56] They'll look at our our um our building codes and and provide some [21:01] recommendations on how we can build a better, more resilient um development [21:07] pattern as well as our parks and and public spaces. Uh final element will be [21:12] economic development. Randy Gross um out of Nashville will be uh looking at the [21:18] econ economic development component of the plan. And Randy doesn't just look at [21:23] our current market and and what opportunities we have currently, but he [21:27] will forecast um out into the future. This the comp plan is a 20-year uh plan. [21:34] Uh Randy will look 5, 10, 15, 20 years into the future and help us um develop, [21:41] you know, our small local businesses, workforce development, as well as [21:45] strategies for uh getting new businesses and um uh folks in into town. Um task [21:55] eight is going to be the implementation plan. Again, one of the requirements of [21:59] the uh the RFP was a a robust implementation plan. This is an example [22:05] from Inner Bureau's St. Louis um project. But we will um develop a very [22:12] detailed um implementation plan that goes from goals and objectives to tasks [22:18] to those responsible for those tasks and what time frames um those tasks will be [22:24] undertaken. Um, and we'll roll that into strategic plans as well. Um, building [22:29] off of the comp plan. And then finally, the final draft. That is not a a draft [22:35] of of one of Interro's comp plans. That's actually a a graphic novel that [22:41] they developed just to help folks understand what zoning and and land use [22:46] was. Um, but uh the last phase of it will be to develop the final plan and [22:52] get that plan adopted. Um, so, uh, staff's recommendation is to accept the [22:59] proposal from Interboro and then allow the mayor to negotiate and execute a [23:04] contract with inner burough for an amount not to exceed $500,000. [23:09] I'd be happy to answer any questions. >> Thank you, League Council. Questions, [23:13] comments? Anybody in the audience questions, [23:18] comments? I'll just say I'm looking forward to it [23:22] and I know it's been a ton of work and I think that's one of the exciting parts [23:27] of it too is all the work that's going into it and everybody coming together. [23:30] But I think from a a standpoint of the leadership [23:34] gives give me confidence and trying to know or knowing that what we want we're [23:40] getting what we want but also knowing where to put it and how that affects our [23:44] quality of life while we maintain that economic resilience which is what we're [23:48] always trying to balance. that >> following on directly behind vision 2035 [23:53] and as we finalize that then being able to put that into something that concrete [23:59] this is what that means and this is what we're looking for. It's a great [24:02] opportunity for help us do as we did in vision 2025 define our future and work [24:07] toward a goal and make it happen and don't just sit back and let it or hope [24:11] it happens. So good good group too. So, any other comments? Council, anybody in [24:16] the audience? Anything? Lee, you have one more? [24:23] » Yes, sir. Um, this is uh one that is actually three different resolutions. [24:28] Um, this is a West Gulf Avenue rightway relocation. [24:34] Michael, my clicker is not >> Okay, there we go. [24:40] Um, and here's the font again. But, uh, so, uh, this will not be on your agenda [24:46] next week. This actually we have to advertise this for 28 days. It's a [24:50] right-of-way vacation. So, we'll advertise this for 28 days. So, this [24:54] will be on a council agenda as a public hearing item in May. Um, so the first [25:00] resolution is to vacate 1.37 acres of West Gulf Avenue. to its unopened ride [25:08] ofway. Um the second resolution is to establish a vacation fee. All these uh [25:15] state laws that are referenced here uh the state won't allow us just to give [25:21] away right away. So we have to establish a fee for that ride ofway. And once that [25:25] rightway is vacated, it's vacated to the adjacent property owners. But so that [25:30] second resolution is a resolution to establish that vacation fee. So, what's [25:35] the property worth? Essentially, what are we getting in exchange for it? The [25:40] third resolution is authorizing the mayor and city clerk to execute a quick [25:44] claim deed to convey that 1.37 acres of right of way. So, [25:50] uh council uh agrees to vacate the right of way. They establish a fee for that [25:54] vacation and they authorize the mayor to actually quit claim that property to the [25:59] adjacent property owners. This is the right of way in question. The image on [26:03] the right is First Baptist Church. Um here on the island, that's uh West 22nd [26:09] Avenue on the north, uh First Street on the west, and then West 20th Avenue on [26:15] the south. You can see First Baptist Church in their parking lot there. That [26:20] purple color is the existing West Gulf Avenue that is that we're requesting to [26:25] vacate. It really doesn't tie into anything. It doesn't tie into West 20th [26:30] anymore. really just serves as a circulator for the the parking lot for [26:35] First Baptist Church. First Baptist Church would like to expand their [26:40] facilities as well as their parking. If you've been by on any Sunday morning, [26:44] you know that parking there, they're they're in need of additional parking. [26:49] So, they would like to expand their parking lot into that ride of way. This [26:55] is something we've been working on for a long time. Um, and it's a matter of uh [26:59] figuring out the ride ofway vacation fee that we finally have an answer to in [27:04] order to vacate this ride ofway and allow them to expand their parking lot. [27:09] Uh, the southern another southern portion of West Gulf Avenue was vacated [27:14] back in 2018 prior to the construction of the Circle K um there on the corner [27:20] of 20th and 59 as well. 59 cuts right through what was West Gulf Avenue. So, [27:27] there is a a portion of what it's east Gulf Avenue on the other side of 59 that [27:33] provides access to the uh city parking lot there in Waterway Village. And [27:38] that's the last remnant of Gulf Avenue in this vicinity. That image on the [27:44] left, the first thing we had to do was uh survey these rights of way and have [27:50] legal descriptions written. So, that's what the image on the left is. That's a [27:54] survey and legal for the ride ofway to be vacated with West Gulf Avenue. The [28:00] second resolution that you'll hear in May is the establishment of a vacation [28:05] fee. Staff is proposing that uh the vacation fee be the dedication of [28:12] property in the airport area. Uh this is what we call an inind donation. Um, so [28:19] the Randy McKenna who's the owner of Equity Builders, you can see on the [28:23] again the survey and legal to the left there. Equity Builders owns a a parcel [28:31] at uh in the Aviation and Business Park and DCNR owns a parcel to the south of [28:37] that. We've been working with DCNR and Randy McKini to reorient these two lots [28:44] to create this ride ofway so that we can make a connection to the airport that is [28:50] almost finalized. It's at the Department of Treasury now. DCNR has agreed to [28:56] everything. There's a um there's actually a fish and wildlife uh deed [29:02] restriction on the DCNR property that we're working to remove. Uh DC&R tells [29:07] us that's going to happen in a matter of days. So this has been a long time in [29:10] the process. Randy is a member of First Baptist Church. He's been wanting to [29:15] help them uh vacate that ride ofway and we've worked this out um so that he can [29:21] make an inind donation to the church and then the church will then donate this [29:26] ride ofway to the city for a connection uh to the airport terminal. They're both [29:31] pieces of property. Uh just just worked out. They are are the same size. So it's [29:38] 1.37 acres that we're requesting to be vacated West Gulf. And this donation is [29:44] 1.37 acres. Uh which provides a very needed secondary access to the terminal. [29:50] These are the two surveys side by side. Again, the same acreage, different [29:55] locations. Sorry about the giant red arrow. Um, but just wanted to show it in [30:01] context. So that blue circle down the bottom lefthand corner is the West Gulf [30:06] Avenue that we want to vacate and we're relocating it through the donation from [30:11] First Baptist Church as a secondary entrance into the airport area. And [30:17] that's the blue circle up in the upper right hand corner. This is um the uh [30:23] what we call a road map from the Waterway East project back in 2022. [30:28] waterway east. You can barely tell on this aerial, but it it's a project [30:31] that's been underway for a few years now. It connects 59 out to the new 161 [30:37] bridge road. Um you it's it's amazing to look at this from back in 2022. There's [30:43] there's no um tower at the airport. There's no temporary terminal. It's just [30:48] amazing to look at how much progress has taken place in the airport area just in [30:54] a matter of three or four years. Um but that plan included this connection to [31:00] Commerce Drive, the secondary connection into the the terminal. You can see it [31:04] outlined there in um red. That's the future terminal location. We have the [31:10] existing access into the terminal, but this one outlined in red will set up a [31:15] secondary access into the terminal. This is a zoomed in view of that Commerce [31:20] Drive connection. It's always been a part of the Waterway East project. We [31:24] need to go ahead and transfer this right away so ASI while they're out there on [31:29] site can construct this connection to Commerce Drive. [31:35] Again, the the airport area uh small area plan highlighted there with the red [31:41] outline. That's the access we're looking for. Ultimately, we'd like to have three [31:45] accesses into the airport area, but this is the the secondary one that is much [31:50] needed as the terminal grows. So, the third resolution here is uh if [31:57] that um rightway donation of the 1.37 acres at um Commerce Drive into the [32:04] terminal is made, then this resolution will authorize the mayor to quick claim [32:10] that the the West Gulf Avenue property, the First Baptist Church, once the fee [32:16] the fee is paid. So, we think this is a really important connection. We think [32:20] this serves a much better purpose for the city uh to provide this connection [32:25] to the airport than the existing West Gulf Avenue does. And we do recommend [32:30] approval of these three resolutions. Be happy to answer any questions. [32:34] » Thank you, Lee. Council, any questions, comments? [32:39] Great opportunity and great generous donation from Randy McKenna. We need to [32:44] recognize that and and thank him for his commitment to help the airport and also [32:50] help the church get what they want. So delighted that this came together like [32:54] it is and so really excited for this opportunity. Anybody in the audience [32:58] with any questions or comments? >> Thank you, Lee. [33:02] » Yes, sir. >> Well done. [33:06] » Next item on the agenda is authorize a contract with FA Engineering for annual [33:12] beach monitoring. Raymond. Yes sir. If you'll recall in 23 and 24 we did a [33:16] beach reourishment project where Gulf Shores, Orange Beach, the state of [33:20] Alabama put approximately 32,000 cubic yards of beach back on or sand back on [33:25] our beaches. And one of the things that we have to do, we [33:30] monitor our beach loss and gain each year. And by doing that, we contract [33:36] with FAT Associates with um Al Browder who's been with us since our first [33:41] researchment project back in 2006 from Olsen Associates now with FAT. Um been a [33:47] great partner with us and doing this monitoring each year allows us to [33:52] maintain good standards with FEMA. So if we have any other storms, then we'll [33:56] know exactly what how much sound we have or how much to gain or put back. And [34:00] what this is is just a two-year contract that will allow us to continue to use [34:04] them and uh updates the pricing that they've given us over the past few [34:09] years. This is a budgeted item each year and uh $64,400. [34:15] » Council questions, comments, baseline study so we can prove what we [34:21] had. The storm comes through, we can prove what we lost. And that's that's [34:25] how we quantify opportunities for replacement overtime with FEMA. So, any [34:31] questions or comments from the audience? >> Brandon, thank you. [34:35] » Thank you, >> Toby. [34:37] » Yes, sir. >> Got something? [34:39] » I do. I have a couple things. The first thing I have is a board reappointment. [34:43] Uh, Frank Holland to be reappointed as municipal court judge and attorney Ken [34:48] Reigns to be reappointed as the city's prosecutor. both to serve two two-year [34:53] term. Um, Judge Holland's term will be April 16, 2026 to April 16, 2028. Um, [35:02] attorney Ken Reigns will be April 23rd, 2026 to April 23rd, 2028. I will be [35:10] happy to answer any questions. >> Thank you, Toby. Any questions? Anybody? [35:18] » You got something else? >> I do. Yes, sir. Uh, the next thing I [35:20] have is a ABC license from Walmart. Uh, Walmart store here in Gulf Shores has [35:25] applied for a lounge retail liquor license. Um, they currently have a [35:30] license to sell beer and wine, but they would like to sell liquor as well. Um, [35:35] it will be scheduled for a public hearing at the April 13th council [35:39] meeting. I'll be happy to answer any questions. [35:42] » There'll be any questions? Anybody? Jenny, [35:53] » my font's messed up, too. Good afternoon, council and mayor. Um, I have [35:57] a couple items tonight. The first is uh naming Alabama 161 southbound. As you [36:03] know, ALDOT has been constructing uh a new roadway which will become the [36:08] extension of Alabama 161 southbound shown here on the left side of the [36:12] screen in sort of orange. Um this schedule this road is scheduled to open [36:17] in May. Um they're ten Aldot is tenatively shooting for the week of May [36:21] 18th to get that road opened. Um and with the opening of that road, Baldwin [36:26] uh E 911 has asked Gulf Shores, Orange Beach, and Baldwin County to uh adopt a [36:34] name for this road. Um they need to have a name to reduce confusion for public [36:39] safety and for emergency responders. So, we um have all come together on the name [36:45] Alabama Beaches Parkway. So, this will be before you to vote on next week to [36:50] name that section of Alabama 161 Alabama Beaches Parkway. [36:55] » Happy to answer any questions. >> Thank you, Jenny. Questions, comments? [36:58] Anybody? >> Another one? [37:02] Uh the next one I have is uh for the engineering design and construction [37:09] manual professional services contract to be executed by the mayor. Um currently [37:15] the city does not have a unified engineering design and construction [37:18] manual. Our existing engineering requirements are dispersed among the [37:23] subdivision regulations and the city code. Um many of those specifications [37:27] are were written more than 20 years ago and are significantly outdated. Uh some [37:32] of them are are lesser standards than ALDOT or our neighboring jurisdictions [37:36] require. Um so we would like to bring those up to date. Uh additionally with [37:42] the comprehensive plan um that we are currently undergoing as a city as well [37:47] as a full rewrite of our subdivision regulations uh by the planning [37:50] department this year. this is a good timing to really clean up all those [37:53] codes, get everything in the documents that they should be in. Um, so we put a [37:59] an RFP, a request for proposals out in February for this and received three [38:04] proposals. Uh, after reviewing those, we found they were all all good, but um, in [38:09] in the city's opinion, MP Design Group really stood out among the among those [38:15] as as a good candidate for the engineering standards. uh they'll help [38:19] us write the technical details really for everything in our ride ofway as well [38:24] as storm water regulations that'll they'll carry across the entire city. [38:28] So, uh we are asking the council to accept the proposal from MP Design Group [38:35] in an amount not to exceed $144,300 [38:40] uh and allow the mayor to execute that contract. Happy to answer any questions. [38:45] » Thank you, Jenny. Council, any questions, comments? I have a question. [38:48] Will this be um in partnership with the comp plan? [38:53] » Remember mentioned storm water? I didn't know if that's [38:56] » they will. Yeah. >> Yeah. We're going to work on all all the [38:58] all all the documents will talk to each other. So the comp plan will provide [39:02] sort of an overarching concept and then the engineering design manual will [39:06] provide really the technical details that support the comp plan. [39:12] » Anybody in the audience questions, comments? [39:15] » Jenny, one more. uh one last and that is to accept the roadways in the Aventur [39:22] subdivision um and allow golf carts on those same roadways. So here you see a [39:27] map on the left showing um the roadways in yellow that are included in this uh [39:32] as Aventura was constructed in four phases from 2017 to 2022. So the [39:38] developer has met both the 24-month waiting period as well as 50% lock lot [39:44] occupancy for all of the phases in Aventura. The developer provided us with [39:48] letters of credit uh for shity for a maintenance and war warranty period on [39:53] the roadway and engineering has done in some inspections on those rideways and [39:57] found several deficiencies within the roadways. We have been working with the [40:01] developer to make those corrections but there are still some outstanding issues [40:06] out there. So, um, in working with the developers, 68 Ventures has agreed to [40:10] pay the city $580,484.50 [40:14] to cover the cost of these repairs, uh, and allow the city to then, uh, take [40:19] over maintenance of the roads and make those repairs in 2026. [40:23] So with this acceptance, the city will take on that responsibility, put that in [40:28] our 2026 roadway repair funds uh and release 68 ventures of their maintenance [40:33] responsibilities on the roadways as well as the bonds that we are currently [40:37] holding for them. We believe this amount will cover all the outstanding work that [40:41] needs completed in those roads. Um Aventur was also marketed as a golf cart [40:46] friendly subdivision. Um and residents have been using golf carts in this [40:50] subdivision. So, with the acceptance of the roadways, we also recommend allowing [40:54] golf carts in the neighborhood. Um, and with all of this, engineering has [40:58] coordinated very closely with the police department and public works department [41:02] on the outstanding items that need done as well as enforcement on these [41:05] roadways. Happy to answer any questions. >> Thank you, Jenny. Council, any questions [41:10] from audience? Anybody? Yes, sir. [41:17] » Good afternoon, Ray Moore. Uh, talking about the golf carts and and y'all are [41:24] going to be considering adding the golf carts to Aventura. [41:28] There's about 18 business owners or managers in Pelican Place and two down [41:34] at Lulu's that have been working with me on proposal that I did email to y'all. [41:42] uh when y'all are thinking about adding the golf carts, if y'all could look at [41:45] that and maybe maybe add that, look at it, it would it would add connectivity [41:51] for the residents that are north of the inter coastal so that we could get to [41:56] restaurants, uh shopping areas and also to Lulu's. And the pedestrian bridge [42:01] hopefully is going to be fixed, not fixed, completed end of the year, [42:06] beginning of next year. that would also give us access to the waterway village [42:11] down there. It's it's a it's a ways off before it is done. But if y'all would it [42:18] at least look at adding those six roads and those other two subdivisions, that [42:25] would do a lot for the community that's north of the inter coastal to let us get [42:29] around on other ways other than uh driving our cars. But if y'all just [42:34] consider that, we'd appreciate it. Thanks. [42:36] » Thank you, Rick. We'll do anybody else questions, comments. [42:41] » Just want to clarify. So for the um police enforcement for everyone. So once [42:47] this is passed or accepted then now we can enforce speeding any kind of traffic [42:54] violations which was one of the biggest concerns with the residents in Aventura. [42:59] » That's correct. So, um, this will be before you next week to vote on and then [43:03] once it's passed, then yes, police will be able to enforce on those roadways. [43:10] Anything else? Thank you, Jenny. Marco. [43:23] » Good afternoon, Mayor and Council. We have a uh request to authorize [43:26] acceptance of an Alabama state and local cyber security grant program award [43:30] providing $165,000 worth of hardware and licensing which we applied for to [43:35] upgrade our traffic system. This is not a reimbursement grant and requires no [43:40] matching funds. All necessary hardware, software, and licensing will be provided [43:45] directly by the Alabama state and local cyber security grant provider and no [43:49] city funds are required for project completion. [43:53] I'm happy to answer any questions. >> Thank you, Marco. Anybody [43:58] any questions or comments? Like those kind. [44:02] » Well done. Next, uh Anna [44:07] » got a couple for us. >> Yes, sir. Good afternoon. Uh before you [44:12] was a request to make two amendments to two existing loans with the airport [44:16] authority. If you recall, you'd previously uh allowed us to extend a [44:20] $1.1 million operating line of credit for operating expenses with the airport [44:25] authority uh following the completion of terminal 1.0. That line of credit was [44:30] intended to cover expenses through 2025 and 2026. uh we are asking to increase [44:36] that cap from 1.1 million to 2.3 million and that will extend through 2026 and [44:43] cover operational expenses estimated through September 30th of 2027. That is [44:48] when their fiscal year ends and at that time uh the line of credit for [44:52] operational expenses shall be repaid. Uh we did work very closely with Jesse [44:56] Fosnau, the airport director, to uh estimate these expenses to the best of [45:00] our ability and I'm happy to answer any questions or I can move on to the next [45:05] request. >> Thank you, Annie. Any questions or [45:07] comments? >> Okay, you can go. [45:10] » Yes, sir. Within the same uh agenda item summary, we also discovered an error in [45:16] a previously adopted uh amortization schedule. Just a little history. Uh you [45:21] all extended a $3 million loan to construct terminal 1.0 and it was later [45:28] increased to 3,815,000. Unfortunately, the amortization schedule [45:33] which was adopted as exhibit A uh was never fully advertised to the additional [45:39] $815,000. So, we are asking to adopt the corrected [45:42] amortization schedule for $3,815,000. And none of the terms of loan will [45:49] change. It will remain an 11-year payback at 6% interest, interest free [45:53] for the first three years, interest only for the next three and fully advertised [45:58] um following those first six years. Happy to answer any questions if you [46:02] have them and apologize for the oversight. [46:04] » Thank you, Anna. Questions, comments, anybody? [46:08] Thank you, Anna. Alex. [46:17] » Good afternoon, Mayor and Council members. Uh, I'm here to present a [46:21] recommended update to the city's list of designated financial institutions for [46:25] public funds. The purpose of this request is to expand our pool of [46:29] qualified banking partners so the city can have more options for depositing and [46:35] investing public funds while maintaining the highest level of security. All [46:40] institutions on our list must participate in Alabama's safe program [46:45] security for Alabama funds enhancement which provides collateral protection for [46:50] municipal deposits. Every bank we recommend today meets this [46:54] requirement. Specifically, we're asking council to [46:57] approve the addition of uh three institutions. [47:01] Ransen bank uh they have formally requested to be added uh to our list of [47:06] approved banking service providers. The finance committee has already reviewed [47:11] and approved their addition. For reference, Ransen Bank recently provided [47:16] the city with a $20 million loan for a airport terminal 1.5 expansion through [47:23] the serious 2026b general obligation warrant de [47:27] demonstrating their willingness uh to support important city projects. [47:32] The next bank uh is Pinnacle Bank. This is a Tennessee based bank that has [47:38] requested to be cons considered for future investment opportunities and hope [47:42] to have a brick and mortar bank in the future. And the last one on the list is [47:48] Huntington Bank, formerly Cadence Bank or Bank Corp South. Following their [47:53] merger, we're requesting to add Huntington Bank to our approved list [47:58] contingent upon their successful acceptance [48:01] uh into this safe program. We expect this process to be completed by [48:06] approximately April 30th, 2026, and they're currently covered under [48:11] Cadence's safe program umbrella for 90 days. We believe that adding these [48:16] institutions will give the city greater flexibility and competitive options when [48:21] managing our banking and investment relationships. Uh staff recommends [48:26] approval of the additional bank depository institutions and I'm happy to [48:29] answer any questions. >> Thank you, Alex. Any questions? anybody. [48:35] » Alex, why don't you introduce yourself and tell us what your job is? This your [48:39] first time at the microphone, so say hello to everybody. [48:42] » Hi, my name is Alex Chyavi. Uh, I'm a county supervisor. So, I'm originally [48:46] from Northwest Mississippi, as you can tell by my accent. [48:51] » I apologize. So, [48:54] » thank you, Alex. You're welcome. Good job. [49:01] Uh Andy, planning and zoning. [49:09] » Good afternoon, mayor and city council. We have a one item before you. It's a [49:14] pre-zone and annexation request uh for Riviera Properties. [49:20] Uh the applicant seeks to uh prezone and annex a 40 acre tract of property. uh [49:28] they want to pre-zone 36 acres to R13 and the remainder to general business. [49:35] The code of Alabama allows municipalities to pre-zone and annex [49:38] properties and it shall uh this type this process follows the same as a [49:43] reszoning process goes to planning commission and then to the city council [49:47] for public hearings. With that being said, this applica this application will [49:51] not be presented next week. It'll have to be advertised and will be on the [49:55] future city council agenda. The property is located at the northwest [50:02] corner of the intersection of Highway 59 and County Road 8 West. It's highlighted [50:08] in red. Currently, the property is not located [50:12] in the city of G Shores. It's in a portion of unzoneed Bowwin County. Uh [50:19] and it's currently vacant uh and vacant wooded [50:25] with it being unzone. There is really no uh uh oversight by Bowwin County or [50:30] obviously the city of Gulf Shores or because it's in an unzoneed piece of [50:34] part of Bowwin County. Future land use plan uh has designates this property [50:40] with three different future land uses. The corner which abuts uh state highway [50:46] 59 is designated commercial and mixed use with the remainder of the property a [50:51] combination of residential low and residential medium future land use [50:55] designations. Again the applicant proposes to prezone [51:00] the corner to general business. It's a 3.6 acre piece of property. You all are [51:06] aware of uh general business. It allows a mix of mixture of uh business type and [51:11] commercial type uses. and the remainder of the property is [51:16] proposed to be reszoned to R13. R133 is a single family zoning district. [51:22] Right now, I believe the only area of the city that's zoned R13 [51:26] is located on West Beach. Um it requires a larger lot size than a lot of our [51:33] existing zoning. I think the minimum lot width is 85 ft with a minimum lot size [51:37] of 15,000 square feet which is greater than the R14 and the R15 zoning that's [51:42] kind of predominates throughout the city. [51:45] We did analyze this request against the future land use plan. Uh a goal of the [51:50] future land use plan is to regularize the city's boundaries. Also again [51:56] annexing this property will provide the city control over any future [52:00] development. um BG the commercial mixeduse is [52:05] supported by the proposed BG zoning and the uh proposed R13 [52:11] uh zoning complies with the future land use plan of medium and low density [52:16] residential uses. We also analyzed it versus the zoning. [52:20] Again, the BG zoning district is appropriate for the 3.6 acre piece of [52:25] property located at the corner of Highway 59 and County Road 8 West. And [52:30] then the R13 is also appropriate um for the remainder of the property. It will [52:36] allow will provide some larger lot size and estate type lots that we really have [52:42] not uh really seen any subdivi subdivision or reasonzoning to this type [52:47] of uh larger lot size in the recent uh past. [52:52] And here is a conceptual subdivision plat that was that showing what the 30 [52:58] the 36 acres divided into 26 lots. They have submitted this to uh the planning [53:05] and zoning department. I think this is tracking to for a May uh planning [53:10] commission meeting. [53:13] And with that staff and the planning commission recommend the city council [53:16] approve the prezoning and annexation of the subject properties. [53:20] Happy to answer any questions. >> Thank you, Andy. Council, any questions, [53:24] comments, audience, anybody? [53:29] » Andy, thank you. [53:34] Chief Netdermire, [53:40] sir. Good afternoon, everyone. No issues with the font here because I don't have [53:43] a slide deck. This should be pretty quick. Um, we took a look at had us some [53:49] residents ask some questions about the current golf cart ordinance here in Gulf [53:53] Shores and they asked why we restricted usage to 18 and above and I didn't [54:00] really have a good answer for it. So, I'm uh coming forward with a proposal to [54:05] change the limit for golf cart operators on the street on city approved streets [54:11] to any licensed driver or somebody who has a would be a learning permit [54:16] situation also with a licensed driver with them. [54:20] Just a simple little change of the ordinance there. Some wordage verbiage. [54:25] » Thank you, Chief. Any questions? Anybody? [54:30] » Okay. Next one, also no issues with font. Um, [54:36] with growth, with growth comes growth. Uh, as you all know, the the Gulf Shores [54:41] International Airport has expanded to 13 destinations and those 13 destinations [54:46] are in obviously in addition to the six that we already have. Uh, I got together [54:51] with Jesse with the airport and we took a look at the scheduling that is going [54:54] to begin this May and we cannot cover the airport anymore with just two [54:59] officers. Uh we took a you know that the there were some days where the earliest [55:05] the officers would have to be there in order to conduct the sweep of the [55:09] airport and when the last plane came in would go beyond a typical 12-h hour [55:14] shift which would automatically place officers in an overtime situation which [55:18] is no big deal but there is also a need around the airport to on those busy days [55:24] to adjust the traffic flow. We need an officer out there to keep the traffic [55:28] moving when when passengers are coming in and passengers are picked people are [55:33] being picked up. So we need an officer out there. It's just additional flights, [55:37] additional resources are needed. So we're proposing for the remainder of [55:40] this year to add one officer to the airport, which would be an additional [55:44] staffing of our current levels. [55:48] » Thank you, Chief. questions, comments, council, [55:54] audience, anybody. >> Thank you, sir. [55:57] » Thank you. [56:07] » I use the same font as chief did. So, uh, the first item I have before you [56:12] today is, uh, the replacement of two UTVs to be used by our beach enforcement [56:17] unit. Um early March we advertised for bids for for the replacement of those [56:22] two UTVs. Uh the bids were open March 26 with four conforming bids. Lowest bid [56:30] being received from Gulf Shores Powersports. So we are asking that you [56:35] award the bid for the purchase of two UTVs to Gulf Shores Powersports in an [56:39] amount not to exceed $47,15660. [56:45] I'll be happy to answer any questions. Thank you, Joe. Council, any questions, [56:49] comments, audience, anybody? [56:53] » Thank you, D. Chief, you got no? >> Yes, sir. Asking for more money. Um the [56:58] uh what we have before you here is a contract Motorola Solutions to provide [57:03] an overall digital evidence management system. If this sounds familiar, we did [57:07] present in the 26 budget package and it was approved then. Um, this is for our [57:12] body warn camera storage, our mobile video camera storage, and all digital [57:16] evidence storage. There's a lot of other components that will help share with the [57:20] community, have the community share with us videos of of potential crimes and [57:25] things like that. Uh, this, as I said before, this was approved in the 26 [57:30] budget package. However, there was some wording in the contract that had to be [57:33] re uh redone to adhere to purchasing agreement. So, what we're asking for is [57:39] to enter into a contract with Motorola Solutions in amount not to exceed [57:44] 329,875.89 [57:48] and that will be spread over three budget years. The first one is already [57:53] budgeted in its account item for that. I'll be happy to answer any questions. [57:59] » Thank you, DC. Any questions or comments? [58:02] Council, audience, anybody? [58:07] Thank you, sir. Public engagement manager Lindsay. [58:18] Good evening, mayor and council. Tonight, I'm pre presenting the [58:22] recommended funding allocations for the city's 2026 spring nonprofit grant [58:26] program cycle. As a reminder, the nonprofit grant program was launched [58:31] last year to support local nonprofit organizations that provide a direct [58:35] impact to the residents of Gulf Shores. For the spring 2026 cycle, where we're [58:40] recommending a total allocation of $6,000, [58:44] these funds will be distributed evenly among three nonprofit organizations, [58:48] each receiving $2,000 grants. The organizations recommended for this [58:53] funding cycle are the Little Lagoon Preservation Society, South Baldwin [58:57] Community Theater, and the Junior Women's Club of Gulf Shores. Um, just to [59:02] summarize what the money will be going towards, uh, the Little Lagoon [59:07] Preservation Society will be utilizing this funding for its oyster gardening [59:12] program. The Little Lagoon Preservation Society engages more than a hundred [59:16] volunteers, including Gulf Shores Middle and High School students, in hands-on [59:21] oyster gardening to support ecological restoration in Little Lagoon. The grant [59:26] will support the purchase of replacement oyster cages, an oyster spat, and basic [59:31] program supplies such as nylon rope and cleats. And last year, their program [59:36] produced more than 92,000 oysters to build a new sanctuary reef. Um, the [59:41] South Baldwin Community Theater will be utilizing the grant funding for a [59:46] facility expansion. This theater is the oldest continuously operating theater in [59:51] Baldwin County, and they've reached the limits of their existing facility. Um, [59:56] so this $2,000 allocation will co cover initial site preparation, specifically [1:00:01] clearing dense brush, so surveyors can complete assessments required before [1:00:06] architectural planning. Um, the last organization, the Junior Women's Club of [1:00:11] Gulf Shores, is going to utilize grant funding for the Clothe the Children [1:00:15] program. This initiative provides essential clothing to Gulf Shore City [1:00:19] School students experiencing clothing in insecurity. Teachers and counselors [1:00:24] identify students in need and volunteers from the Junior Women's Club shop [1:00:29] discreetly for each child spending a minimum of $250 per students. Items [1:00:34] include shoes, socks, underwear, shirts, pants, and seasonally appropriate items [1:00:39] such as coats. All items are delivered privately to the school to maintain each [1:00:44] child's dignity. So, in summary, these three organizations demonstrate [1:00:48] measurable community- centered outcomes in environmental stewardship, arts [1:00:52] access, and just general youth well-being. Our staff recommends council [1:00:57] approves the allocation of $6,000 for the 2026 spring nonprofit grant program [1:01:03] with $2,000 dollars awarded to each of the three organizations. And I'll answer [1:01:07] any questions. >> Thank you, Nancy. Council [1:01:11] questions, comments, anybody? >> Thank you very much. [1:01:17] » Next, uh Mr. Han, you've got four things it looks like. [1:01:22] » Yes, sir. Thank you. So, our first item is award [1:01:28] the bid for our VMS, which is our variable message board that we have [1:01:32] throughout the city that we can be able to display messages for traffic or any [1:01:36] type of emergencies. Um, so we went to bid March 12th. U we opened bids and um [1:01:43] for two VMS boards which we budgeted for for 2026. Our lowest bib was Armasco, [1:01:50] but they didn't meet the specifications. there's things that the guys need in the [1:01:54] field with it. So, they uh we have we're dropping that bid and awarding the bid [1:02:01] to ProLogics IT for 39,76122. [1:02:07] So, that is that's for two boards. And so, the beauty on this is if they need [1:02:12] the police department or fire department needs a message changed or traffic [1:02:17] condition change or the uh it's been remedied, you can turn it off by your [1:02:21] phone. you can just you type a different message. So it's it can be handled [1:02:25] remotely and that keeps anybody having to go back in traffic, sit in traffic to [1:02:29] be able to go turn the message board off for um just so it's a whole lot more [1:02:35] streamlined. It's worth it for us. So um so that's that's all I have for that [1:02:42] that item, but it is a budgeted item. >> Questions, comments? Anybody? Okay. No. [1:02:48] » Okay. Okay. So our next item [1:02:54] is high school G's high school uh change order number four. So we have um [1:03:03] this this change order involves uh proposed enhancements for the new high [1:03:07] school project. This change order focus on bringing the facility to a full [1:03:12] operational condition. Uh and we kind of categorize uh this change order into [1:03:17] three main categories and that was owner initiated items [1:03:21] items that the owner needed which the school needed to be able to open up the [1:03:25] school. We have some error in emissions, some errors in the plans that we were [1:03:29] having to to address and now we're in the process this past month really been [1:03:34] hitting hard on our code inspections with the Department of Construction [1:03:39] Management. DCM has been running their inspections every day and so with our [1:03:44] fire department. So there are some code requirements that's that's having to uh [1:03:50] now involved with this. So I just kind of described those three items how [1:03:55] they're categorized. So just kind of a little bit of a history. Uh if y'all [1:03:59] remember practice pavilion, we we uh 6.8 million that we did for change order [1:04:05] number one. Uh the school paid us back for that practice pavilion. So that's [1:04:10] covered. Change order number two, we had the low voltage issue and some roadway [1:04:15] work. Uh that was a 1.5. Then we have miscellaneous change orders recently on [1:04:21] change order number three at 750,000. Uh and then change order four which is [1:04:26] before you is 1.9 million. So I just kind of if you look below it where I had [1:04:32] change order impacts. So normally it's a a project this size industry standards [1:04:39] is right around 7 to 10% of your original contract. We're running at a [1:04:44] three and a quarter 3.25% for it. So we've been working very diligently. We [1:04:50] know somewhere the industry standards is 7 to 10%. I think that was just kind of [1:04:54] really critical and like everybody to see. I mean, what's I know that when [1:04:57] we're coming with the change orders, it seems like it is and it is a lot, but [1:05:01] also we're very diligent in this process. So, I just wanted just to to [1:05:06] let y'all know that's where we were. So, this is what was submitted to the [1:05:10] council um when we're doing the change order. So, you have the items totaling [1:05:16] up to 1.9 million. And so, if you notice that the owner contingency allowance [1:05:22] replenishment is 1.5 1.4 45 million. So what I want to be able to describe on [1:05:31] this on the next one uh is this top section is what the change orders that [1:05:38] the architect Vulkart and the city we have all approved that work was [1:05:44] completed and that's what the money's owed. [1:05:47] The next batch below it, we're all agreeance with the work, but the [1:05:51] architect has not fully approved that work where it doesn't have a designated [1:05:57] where when the state receives this change order, it is um it didn't really [1:06:01] have the number attached, but they can pay it through a um through the [1:06:06] allocation of the replenishment of those funds. The state can be able to reach in [1:06:10] that pocket and to be the contractor can charge to that fund. So with the [1:06:14] remainder of that, the third item, theoretically we have about $300,000 [1:06:20] left in contingency funds that if something happens between now and the [1:06:25] actual end of project of the cert certificate of occupancy, the CO, we [1:06:31] have a mechanism to be able to pay the subs, pay the contractor a lot quicker [1:06:36] than coming back with a change order. So hopefully right now we have captured [1:06:40] everything and we can come back with you with change order number five which is [1:06:45] called a deductive change order that we'll be be able the project gives the [1:06:48] money back to the owner said we didn't use these funds. So I just kind of [1:06:53] wanted just to show you where we fail in this this alignment where we are. So [1:06:58] here's kind of some examples of some change orders that are on here. I mean I [1:07:03] can go through all these change orders but there's 40 of them. So, I don't know [1:07:06] if anybody here want to go through every single one of them. Uh, but I would, but [1:07:10] I will. Uh, but change 47. So, I know in the beginning when we were touring the [1:07:16] school, I mean, some of y'all have been when you could walk by the restroom and [1:07:19] you can kind of see uh into the bathrooms. So, some schools do have this [1:07:25] so you can be able to keep maybe some mischief down or or if anybody's vaping, [1:07:30] whatever they're doing right now in the bathroom. But I don't believe they [1:07:34] really want that the intent to be able to see anybody at the you know at the at [1:07:38] the bathroom at the mirror. So we built those walls that you see on the right [1:07:43] hand side to be able to shield and it still has the intent to be able to have [1:07:48] open air so you don't have to open doors going to the bathroom. So that's an [1:07:52] example of that. Another example, and this is owner initiated, is that uh the [1:07:57] locker rooms inside the fieldhouse. Uh there's a there was curbing that was [1:08:02] called out that the lockers sat on top of the curbing and it was about 6 in [1:08:07] high. And if you see coach HUD uh standing right there and the shoulder [1:08:12] pads are sitting on top of the um the locker and the helmet, they couldn't [1:08:17] reach to the top. So we we had them remove all that concrete for the curving [1:08:22] and drop that down 6 in to be able to have that. That's kind of that was like [1:08:26] a cop which is um change order proposal is what that means. So that's 116 and [1:08:33] that is the examples of what we go through pretty much on a daily basis of [1:08:38] a change and if we agree with that change then they move on then the [1:08:43] architect approves the actual price of it. So it goes through multiple hands. [1:08:48] There's RFIs, ASIS, there's everything that you go through to be able to make [1:08:52] sure that all this is done in compliance. [1:08:56] So, this is what we're in front of you now recommending the 1.9 million and [1:09:01] change order number four. There's a uh kind of a breakdown between the between [1:09:06] these items. Um, you know, you have the the owner initiated which was 484. You [1:09:12] have DCM issues are really high. Now, keep in mind this is that the whole [1:09:16] thing, the total of that 1.9 million. That's kind of the makeup and the [1:09:21] percentages or the cost that goes into each of those buckets. [1:09:26] Uh so, um that's overall, but I can answer any questions if you have any. [1:09:32] Sorry if I got too into detail with it or I can get in more, but I can answer [1:09:37] any questions if you like. >> Thank you. No council, any questions or [1:09:41] comments? Audience? Anybody uh want more [1:09:45] information or any questions about what he's what he what you've received? [1:09:51] » If not, no, you can move on. >> Okay. So, we do have two more items and [1:09:56] they're they kind of run hand in hand, but the Gulf Shores High School [1:10:00] subdivision. So, we had uh GMC did a subdivision plat to be able to um [1:10:09] incorporate the the the entire site of the high school onto one piece of [1:10:14] property. The prior property this it was called Green Acres was 40 acres of land [1:10:20] that that that was on, but eight of that acres there was still missing of the [1:10:24] infrastructure that the school sat on. So, we had to redo a subdivision plat. [1:10:29] So, we needed to authorize uh the mayor to be able to sign the plat and have it [1:10:35] recorded with the probates court and then turn around to be able to uh after [1:10:42] that's been recorded and it has the slide number on it. We can then convey [1:10:46] uh which is the next resolution is convey that piece of property to the [1:10:51] board of education so they can be able to accept that property. So when they [1:10:56] get a when we get the certificate of occupancy for the school, they own the [1:11:00] property and they can then uh get insurance on the facility so we can [1:11:05] streamline it. But so it's two resolutions in one, but it's the same [1:11:10] it's a thing same thing of property per se. [1:11:15] » So the first one is the for the mayor to execute to sign the final plat of the [1:11:19] subdivision and >> Yep. Yes, sir. The sec second one is [1:11:22] donating the real property to the from the city to the school. [1:11:25] » Yes, sir. >> Any questions or comments on any of [1:11:29] those council audience? Anybody? >> I believe that's a wrap for me. [1:11:35] » Thank you. [1:11:40] Grant, you got the end of the show, but you got five things to do. [1:11:46] » Yes. I'm anxious to see what fonts show up for our presentation tonight. [1:11:51] Um, Michael, this is not the correct first slide. This is later into the [1:11:56] presentation. Want to do the school one first, [1:12:00] which is the sportslex improvements. Is that possible? [1:12:08] It's not possible. >> Well, we we can do it in whatever order [1:12:12] you choose. >> Okay. [1:12:15] Well, then let's go ahead and start with our first large group activity permit [1:12:18] application, which this one is uh um no surprise to any of us here. Uh since [1:12:26] 2016, uh 10 years, we have been the host city along with our partners with our [1:12:32] Alabama um beaches, sports, and events hosting the NCAA National Beach [1:12:37] Volleyball Championship. So, it is that time of the year again to get the permit [1:12:43] uh through the mayor and council. This uh this year's date of May 1st through [1:12:48] 3rd location is G Place Public Beach. We will begin setup on April the 20th. Uh [1:12:55] and the main Gulf Place area south of Highway 59 around uh the the hangout [1:13:00] will close to the public on April the 22nd. And that's so that we may start [1:13:05] bringing in the heavy scaffolding and the large tenting and start creating the [1:13:10] the site. This is a controlled site where they charge an admission fee for [1:13:14] this tournament. So, we have to put up the fencing and the trust work to get [1:13:18] ready for ESPN to come to town to do uh to do the the television. Um the East [1:13:24] Golf Place parking lot um will not close. This is the wrong slide. Um so, [1:13:30] do not worry about the East Golf Place. That's the resident parking lot that [1:13:32] remains open for this entire championship. So, um we don't have to [1:13:36] worry about that. And um the site will return back to the [1:13:42] public's use after the completion of the event and the cleanup on May the 6th. [1:13:48] So, uh this is a a blowup of the site plan that gets created um south of the [1:13:54] hangout restaurant along the boardwalk. Uh large uh scaffolding goes up for the [1:13:59] TV towers. The blue or purple squares are for jib cameras for the television [1:14:05] broadcasting. New this year, if you look to the left and the right, uh you'll see [1:14:10] some hash some purple hash marks. Those are the large bleachers. You'll recall [1:14:16] about eight months ago, uh you approved a grant receipt from the the state to [1:14:22] enhance this event in the amount of $200,000 and we purchased those [1:14:26] bleachers. There are 330 seats each. So, we've added 600 seats to the [1:14:32] championship site. Uh, public works was able to take the once of the bleachers [1:14:36] down to the beach to make sure that we can uh get them out there on the sand [1:14:40] and they can be deployed safely. So, that will uh that will work. The rest of [1:14:45] the site is very similar to what has been in the past years and um looking [1:14:50] forward to a a real good event uh this coming year. So, this is the schedule of [1:14:55] events. Um May the 1st, Friday. ESPN 2 will cover [1:15:00] the matches. They start at 9:00 and the final match uh is over at 4 or or starts [1:15:05] u being played at 4:00. Saturday, May the 2nd, uh once again 9:00, a little [1:15:10] earlier um completion after the 2:00 match. And then Sunday, we have one [1:15:15] championship match at 11:30 a.m. and that will be on ESPN's [1:15:21] um national channel. Um, parking as always is a question when [1:15:26] you get large events such as this and that will feed into the the next [1:15:29] application that is also taking place at the beach this particular weekend. But [1:15:34] in addition to this u the public parking locations we have worked with Ron Durham [1:15:39] to be able to utilize the site just to the west of the embassy seat suites. So [1:15:45] we have uh worked a memorandum of understanding with him. We'll have [1:15:48] insurance to protect both him and the city. And uh we'll have that lot [1:15:52] controlled with security guard to make sure that um people that are in town for [1:15:56] volleyball spectating and volleyball uh participation are able to use that lot. [1:16:02] And so tickets are now available. If anybody would like to purchase tickets [1:16:07] to um to spectate at this event, we encourage you to go online and do so. [1:16:12] And as I mentioned, um, Michelle Russ is here and Sarah Cooper with the Alabama's [1:16:18] Beaches and, uh, they'd like to step up and say a couple words about the [1:16:21] partnership that we've had over the years. [1:16:32] » Thank you, Grant. Michelle Russ with um Guff Shores and Orange Beach Tourism [1:16:36] Sports and Events and we're excited to continue the successful partnership that [1:16:40] we've had since 2016. Not only does this event bring tourism, economic [1:16:44] development and impact to our area, it also aligns with our brand of Alabama's [1:16:49] beaches and big beach um small town big beach. So, it aligns with our brand and [1:16:54] it also really brings some pride to our community. a lot of our young athletes [1:16:58] in the community get to come out and volunteer or they play with the youth [1:17:02] event that's taking place in conjunction. So, we appreciate the [1:17:05] partnership. It's more than just great beach volleyball that's televised [1:17:09] nationally. It's a lot of other things for our community. So, thank you. [1:17:13] » And as a quick reminder, we're um this year 2026 as well as last year 2025 were [1:17:19] two years that the national championship was supposed to be in Long Beach, uh [1:17:23] California. And so we've had them back here and y'all have already approved uh [1:17:28] hosting this event until 2031. So we're gonna we're going to have had the beach [1:17:33] volleyball championship here for quite a long period of time. Um and look forward [1:17:37] to its continuation even into the future. So be happy to answer any [1:17:42] questions. >> Grant, is there fencing on the east and [1:17:45] west? >> Fencing on the east and west of the [1:17:49] volleyball site. Yes, it is a completely fenced in closed offsite ticketed access [1:17:55] that you enter through the main gate which will be down main highway 59 uh [1:18:00] near the public restroom. Yeah, there sure is. [1:18:06] » Any questions audience or council on beach volleyball [1:18:13] for the CVB or for us for the operator? If not. [1:18:20] » All right. So then, as I mentioned, in conjunction with the national [1:18:23] championship on the eastern edge of our public beach area, we have received [1:18:28] another large group activity application for Beachfest. Beachfest USA volleyball [1:18:33] is a beach qualifier. This is the junior event that takes place uh over the same [1:18:38] weekend uh on the West Golf Place beach area uh south of the town green and and [1:18:44] the rest the rest of that West Beach area. So, from 7:00 to 5:00 on the um [1:18:51] April 30th through May the 3, we'll have the the uh Beachfest tournament setup [1:18:56] will begin on April the 24th, and they will actually um finish their [1:19:02] tournaments on May the 4th, which is the Sunday following the National [1:19:05] Championship. So, this is a big event. It they put 64 nets and courts out on [1:19:10] the beach. It's a free event open to the public. 16 years. Each of the year that [1:19:15] we've had the NCAA National Championship, we've also hosted this [1:19:18] Beachfest uh event. This brings in uh youth uh beach volleyball teams from all [1:19:25] over the country um from Texas, from California, from everywhere. Uh people [1:19:30] and families are coming in for their children to participate in this event. [1:19:33] It's a huge economic impact weekend u from this uh from this large number of [1:19:38] teams. This year they'll have music uh on the uh town green shade sale uh only [1:19:45] on Saturday night from 5:30 to 8 o'clock in the evening. They'll be having live [1:19:48] music. They'll bring food trucks in to be able to support the e extra people [1:19:53] that are in town for this this event. They will also have vendors um selling [1:19:57] wares uh within the the tournament footprint. [1:20:02] Um the parking for this in previous years [1:20:07] when we've hosted Hangout Music Festival, this um West Golf Place [1:20:12] parking lot has been unaccessible to volleyball parkers, people parking their [1:20:17] vehicles there because the hangout had started building their um cabanas and [1:20:22] other infrastructure necessary for the music festival. And they would have put [1:20:25] large plastic mats out on the sand to create additional parking. This year [1:20:29] with no music festival, there will be no construction going on in our West Golf [1:20:33] Place public parking lot. So that will now open up all those spaces for the [1:20:38] general volleyball participants. They will also be welcome to park across the [1:20:41] street in that lot next Embassy Suites and all the other on street parking uh [1:20:47] locations within this area. But it will be a big weekend and a lot of lot of [1:20:51] people, a lot of spectators in town for this for this event. [1:20:55] um mentioned the format, the three-day tournament, the two divisions. We [1:20:59] recommend approval of this event in conjunction with the national [1:21:03] championship. They do have one contingency. They do have food vendors [1:21:06] involved, uh food, uh trucks and vendors involved. So, we'll need to make sure [1:21:10] that those are inspected and approved um prior to them setting up and we'll make [1:21:15] sure that that's part of this. With that, I'll be happy to answer any [1:21:18] questions. >> Just not a question, but a comment. Uh [1:21:21] with the addition of the Durham lot, it will allow some public parking in one of [1:21:26] the two spaces. Either on the Durham lot, you don't have to be a volleyball. [1:21:30] The public can still go and park in the beach area. If you get there early [1:21:33] enough, you can park in a normal parking area. If not, you can park in the Durham [1:21:37] lot and walk over. So, we will have residential parking that we've had in [1:21:42] the past, but in a different location, different than we've had before. So very [1:21:46] gracious of Ron Durham to allow us to use that for all these events that's [1:21:50] going on within this time frame. So >> yes sir [1:21:53] » noticing that any any other questions or comments council or audience? Anybody? [1:21:59] » Anything? >> Thank you Grant. You got more? [1:22:03] » Not sure what's next. Michael, what's next? Okay, so I'm gonna step aside and [1:22:07] let Laura step up for a moment. >> Gota be a little nimble. Grant, [1:22:13] » good afternoon. Um before you we have a application for [1:22:17] approval for the worship on the green May 16th. [1:22:21] It's Saturday, May 16th. This is going to be at the town green from 10:00 a.m. [1:22:25] to 400 p.m. Um they'll begin setting up at 7:00 a.m. and uh we'll break down [1:22:30] immediately following the event. Um this is a community worship gathering um put [1:22:36] together by multiple local churches here in the area. It's a family-friendly [1:22:40] event. um going to be filled with food trucks, music, um you know, uh ministry [1:22:46] throughout the day. Um it is a free event and it is open to the public. Uh [1:22:52] just real quick on the site, there will be a bike rack that uh is surrounded the [1:22:57] perimeter of town green with two entrances on the east and the west side. [1:23:01] Um as far as parking goes, general public parking is available for this [1:23:06] event. [1:23:11] This has been routed in through the department for uh department head [1:23:15] approval. Recommendation is to approve contingent upon the food vendor um [1:23:19] inspections and approvals. Uh with us today is Blair and Jenny [1:23:25] Hoggood from the Methodist Church. And I believe do you guys would you like to [1:23:30] say a few words? Sure. [1:23:40] So, I'm hop Jenny. Uh, we live on First Avenue uh right in the heart what's [1:23:45] usually Hangout Fest or Stand My Boots Weekend. And, uh, we've been here since [1:23:49] 2018. I'm also on the bicycle pedestrian committee and just joined that committee [1:23:54] this past year. And so we thought this' be a great opportunity with the hangout [1:23:58] fest not happening this year to do something for the community based that's [1:24:02] not in revenue based and actually really focus on worship and basically giving [1:24:07] back to the community. So kind of a grass grassroots effort here. Um it's [1:24:12] actually a really good weekend though because the same weekend is we're [1:24:14] rededicating the nation under one nation under God again. Uh there's other [1:24:18] churches having comm community uh religious events in the community as [1:24:21] well. Uh Oyster Bay Baptist Baptist Church is having a blasting cast event [1:24:25] for men. Uh Island Church is having a golf tournament that same weekend. So we [1:24:29] thought it'd be a great opportunity for us to bring the community together in a [1:24:34] very uh healing event. And um Laura's been great, Gran's been great, Chief [1:24:39] Nemar's been great giving us guidance on how to kind of bring this community [1:24:42] together for this event. And we appreciate your consideration um in [1:24:46] putting this on. So any questions do you have for us? question but a comment. [1:24:51] Thank you. >> Thank you. I think you'll be a great [1:24:54] addition to our community. So, >> we appreciate it. It's very special [1:24:58] place to live and we're very proud to be a member in this community. So, thank [1:25:02] you all. >> Thank you. [1:25:04] » Any questions or comments? >> You did all the work. I just [1:25:08] » We knew that. >> Thank you. [1:25:11] » Thank you. >> Any questions or comments from the [1:25:14] audience or from the council about this application for approval? [1:25:19] Okay, Lauren. >> Um, [1:25:21] » you have one more. >> One more. Yes. This is the United States [1:25:24] Life-Saving Association Southeast Regional Championship. It'll be held [1:25:28] here at Gulf Place July 13th through the 15th um 8:00 a.m. to 6:00 p.m. uh daily [1:25:34] for this schedule. Uh they'll begin set up on um July 12th and everything should [1:25:39] be back in order by 10:00 a.m. on the 16th. Um for this event there will be [1:25:44] about 150 participants per day um competing um in competitions that [1:25:49] consist of swimming, board paddling, and running. It is a free event. It is open [1:25:55] to the public. Uh just a real quick overview here. There will be barricades [1:26:00] on the east and west sides. Um bike rack, again, open to the public. Um [1:26:06] spectators can watch from anywhere outside of the back uh the barricades. [1:26:11] They'll be through access on the north side. Um again, it's been routed through [1:26:16] department heads for approval. Recommendation is to approve um [1:26:19] contingent upon an updated uh COI. Um with us this afternoon is Melvin Shepard [1:26:26] from Fire and Rescue um to answer any questions. [1:26:31] If there are any questions, >> any questions or comments? And this is [1:26:34] competition we will be competing in also our our team. [1:26:37] » Yes, sir. >> Fantastic. [1:26:40] home field advantage. I hope >> any com any comments by anybody, [1:26:47] » Laura. Thank you. >> Thank you. [1:26:51] » And believe it or not, >> there's one more item. [1:26:53] » I got one more, >> but I'm not sure if we have a [1:26:55] presentation or not. >> So, we don't have a presentation. So, [1:26:58] I'll just uh I'll go through my notes. How about that? So, uh also on your [1:27:02] agenda for next Monday is uh an item that's being brought to us at the [1:27:06] request of the Gulf Shore City Schools. they for quite a long time has been [1:27:10] working to um to help expand and to create some additional space at the Gulf [1:27:16] Shores Sportslex. So before us is a um proposal from the Gulf Shore City [1:27:21] Schools to expand and improve some of the area at the Sportslex and these [1:27:26] improvements include uh two separate one baseball, one softball, a 9,000 square [1:27:32] foot clubhouse and that would be uh an indoor hitting facility, indoor locker [1:27:38] rooms, um coach's office and storage for the softball team. and then the same [1:27:45] type of facility for the baseball team. And in addition to those two constructed [1:27:51] buildings, in addition to the existing fieldhouse, we're trying to add square [1:27:56] footage to the current fieldhouse, which is significantly undersized. It would be [1:28:00] a 2100 square foot um expansion to the fieldhouse, and that would be the locker [1:28:05] rooms for the soccer teams and for the track team. and it would be [1:28:10] appropriately in size for the growth and the growing portion of our football [1:28:15] team. Um, also replacing the existing homeside dugout and visitor side dugout. [1:28:22] So, if you envision on the screen that we don't have for you, which I do have [1:28:27] the presentation, which I can show next week. um the hitting facility. If you're [1:28:32] inside the softball hitting facility in the locker room area, you will go [1:28:35] directly from your building into your homeside dugout. And then the dugout on [1:28:40] the visitor side will be shifted um and moved slightly further away from the [1:28:45] bleachers to eventually allow for additional seating capacity for the um [1:28:51] for the for the uh future. And the same with the baseball. So in the baseball, [1:28:55] the existing batting cages that are between the softball field and the [1:29:00] varsity baseball field, those go away and are replaced with a building that [1:29:04] would have indoor cages and their locker rooms and their coaches offices and some [1:29:10] additional storage. And then the visiting teams dugout would get slid and [1:29:15] redone as well to match everything else. Uh in addition to the building [1:29:21] facilities, it will work to create sidewalking and some additional um [1:29:27] common space in between all these buildings to to to finish out to finish [1:29:30] out that area that's really never been completely finished out. The additions [1:29:34] will match the existing exterior of the current uh constructed buildings, which [1:29:39] is CMU block with some split face and the same type of metal standing seam [1:29:44] roof. So um this proposal was brought before [1:29:49] our recreation committee and the recreation committee at that time [1:29:53] unanimously recommended the approval of this project and that now is moving to [1:29:57] the went to the planning commission. And the planning commission had a cursory [1:30:00] review of this project because it's uh on city property being constructed which [1:30:06] needed to go before planning commission and the city as the owner of the [1:30:10] property the city council must approve before we um move forward and take this [1:30:15] project out for bid. There is some time constraint on this project. The goal [1:30:19] will be to try to um start construction just as soon as possible so that in the [1:30:23] spring of 2027 when next year's seasons arrive that these facilities will be [1:30:30] ready and up and usable. Uh financial impact for the city there is none. The [1:30:35] city school system will be funding this through grants and through uh program [1:30:41] fees that are generated by the sports programs. Um, so recommendation is to uh [1:30:47] pass a resolution authorizing and allowing the Gulf Shore City Schools to [1:30:50] make improvements to the city-owned sports flex facilities as presented. And [1:30:55] I'll try to answer questions and I know that Dr. Aken is in the audience and so [1:30:58] is Kevin Corkran. Happy to uh to try to work together to answer any of the [1:31:03] questions you might have. I'm >> assuming these are conditioned spaces [1:31:06] with the with the heating inside and dug up. [1:31:09] » They are conditioned spaces. >> Conditioned spaces that be necessary. [1:31:12] Any other questions or comments? Anybody? I [1:31:15] » have a couple questions. So, will this be like a land lease or how how do we [1:31:21] » manage that? >> So, the current the current thought is [1:31:23] the land will still remain city land. The buildings will be owned by the city. [1:31:27] We'll lease the facilities to the school system. We'll come up with an [1:31:30] understanding with the school system so that they will um similar maybe to um [1:31:36] the volleyball facility that was recently uh built at the uh sports flex [1:31:41] where the operator leases the facility from the city and they're responsible [1:31:44] for the the power bills and for any of the maintenance and upkeep and insurance [1:31:47] related to those facilities. >> Do we have a timeline for that lease? [1:31:52] » We do not have a timeline. I mean once we get the buildings first thing that [1:31:56] has to happen is the buildings need to get bid out to make sure that the dollar [1:32:00] amount that is being anticipated meets the budget that is been set aside for [1:32:05] this. So that'll be the first step and once that is done then we'll work on [1:32:08] getting all the legal um leases drawn up and all that information. [1:32:13] » I just have a couple questions. The um you said the existing batting cages will [1:32:18] go away. >> Yes. So [1:32:21] my question for the for the land lease and just kind of in general is [1:32:26] understanding the terms of using our public space [1:32:33] for our city schools and how we're going to share that and are we clearly defined [1:32:38] so that the schools understand and the public understands so that we're in [1:32:43] alignment with that. I just I don't I haven't I don't understand [1:32:48] I don't see the clear clear definition between how that relationship's going to [1:32:53] work or outlined. So that's that's my question on that. And then specifically [1:32:57] if our existing batting cages are going away, [1:33:02] where does the public use? I don't think they're going to be allowed to use these [1:33:06] new batting cages. Right. >> So a couple things. The the current [1:33:08] batting cages are the softball varsity softball batting cages that are at the [1:33:14] softball field. Those are not used by our wreck sports programs. The batting [1:33:20] cages that are in the center, which is between the varsity field and the [1:33:24] softball field, they're generally not programmed for wreck. Doesn't mean that [1:33:28] if they're not open that they couldn't jump in there, but the seasons between [1:33:32] recreation sports and school sports are almost identical. So when the high [1:33:38] school athletes are out there using their batting cages, the rec sports kids [1:33:42] wouldn't be using them anyway. So really the batting cages that we're removing [1:33:46] and replacing with the building are are truly varsity sports batting cages [1:33:52] primarily. And then off season, we would be maybe able to work out anou with the [1:33:58] school system to let them and their uh coaches um have some time for the the [1:34:04] wreck uh sports kids to use those cages, but we'd have to work that out in some [1:34:08] of the ou [1:34:12] looking for >> like to see that laid out before [1:34:16] granting permission of our public space when I know that we're and we've talked [1:34:20] about this a lot about that we we're tight on space and we're growing for our [1:34:26] wreck programs. Yeah. So, >> if this is going to be a less of a [1:34:31] public space, that's okay. But I just want to know that that's clearly fine so [1:34:36] that our expectations for our wreck people know because I our wreck does use [1:34:40] those batting cages. those those >> not they're not supposed to, but [1:34:45] » those primary fields have been really placed for school baseball and softball [1:34:52] primarily. When the Sports Flex was initially built way back in the 2000s in [1:34:58] that first phase, the our relationship we had with Baldin County School System [1:35:02] was we the city would purchase and build the sports facilities for the school if [1:35:09] the county at that time would build a high school. that way they didn't have [1:35:12] to put additional athletic facilities on school campus because there wasn't [1:35:16] enough room, etc., etc. So, we um really for the past seven or eight years [1:35:24] stopped even renting those two fields out for summer travel ball tournament [1:35:30] play where they come and rent fields and use those because baseball and softball [1:35:34] have now become year- round sports for our schools. And so there's really not [1:35:40] very many times or too many opportunities for for non school-related [1:35:44] activity to participate in either those fields or in those batting cages. So if [1:35:50] we need additional batting cages, we have other locations that we can build [1:35:53] recreation batting cages that might be more appropriate. Either expand at SIMS [1:35:57] or add some more at the fiveplex, which I know the rec sports kids are using [1:36:02] that now for some of their practices. that might be a more appropriate use, [1:36:07] but I don't see this facility being opened up to just general recreation. [1:36:12] And I might be wrong. Maybe Dr. Aken wants to chime in on this, but I think [1:36:16] this the goal of this is the schools facilities primarily, and that's what [1:36:21] this is the request is for. >> I I would like to comment on that as [1:36:25] well. I mean, it's not dissimilar to how we operate our football stadium. I mean, [1:36:30] that football stadium isn't open for public use on the football field. [1:36:34] typically. Um, and I also don't really see the differentiation between our high [1:36:41] school students and the general public. I mean, our high school is a city high [1:36:45] school and the students at our school system are citizens of Gulf Shores. So, [1:36:50] that is a public. So, I mean, as a city, we're supporting the school system, [1:36:54] which is supporting residents of the count of the city. So, I really don't [1:36:57] see it as a big differentiation between uh public use or school use. It's really [1:37:02] one and the same because our school system is our public. [1:37:06] » Well, it's the I agree with you overall, but it's when you're trying to book a [1:37:11] field, that's where the difference is is whether you're a coach trying to book a [1:37:15] field or you're a wreck. So, that's so that's the use difference. We're all [1:37:20] part of the same system, >> but I think both those both those fields [1:37:22] are predominantly for varsity athletic use and and so they typically have not [1:37:27] been rented out as far as I know. >> Is that correct? [1:37:30] » That is correct. Yes, sir. >> I think Jennifer's point is I I agree [1:37:37] with one of her points and that is we're woefully short of fields available for [1:37:42] our youth sports to play on and for our public. That's a fact and and this is [1:37:48] not the answer for that. But there needs to be we need to find an answer. We [1:37:53] don't have enough fields for our kids to play in. [1:37:58] Any other comments or questions or anything? [1:38:05] Are you through now? I don't think you have any more slides [1:38:09] anyway. So, uh, that's that's all we have here. Uh, Dr. Aken, schools, [1:38:16] anything to add? Any good news to share? Y'all want [1:38:22] anything? Y'all want anything else? I hadn't we had heard from you winning [1:38:25] anything in a while. >> I always have good news to share. So, um [1:38:29] first, our director of exceptional education, that's Dr. Sonia Price, just [1:38:33] uh wrote some grants. And so, we got a $100,000 grant to support our existing [1:38:38] specialed prek class. So, right now we have four prek classes. We've just also [1:38:43] applied for three additional prek classes now that we the new high school [1:38:47] will open and we can expand. Um and that's a big need of this community. We [1:38:52] have about I don't know 60 kids on a waiting list right now for next year. [1:38:56] So, um hoping that that comes through and excited about the possibility. Um [1:39:01] Dr. Price has written almost $600,000 in grants that are supporting existing [1:39:06] programs. So, that that really really helps our budget. Um the other thing I [1:39:11] talk about um technology a lot and if I can get this to open um using [1:39:16] technology, >> you better take your spotlight. [1:39:18] » Uh we we recently We recently sent our technology teams [1:39:23] from the middle school and and high school to Birming or Montgomery for a [1:39:27] technology competition, coding, robotics, all those things. And um we [1:39:33] sent 21 kids. We have 12 first place [1:39:37] finishes, five, second, and and third, fourth. So they all they all play. So [1:39:41] really pleased with how that technology department is is growing and how [1:39:45] successful they are. So that's all I got. [1:39:48] » Thank you. Anybody with anything else they'd like to [1:39:53] discuss tonight? >> Anything on your mind? [1:39:57] » Council, I have an update. >> I have an update. [1:40:00] » Okay. >> Uh this weekend, I want to remind [1:40:02] everyone that the Love Our Locals LOL Festival will be taking place in [1:40:05] Waterway Village. Last year, that event was plagued by inclement weather down at [1:40:09] Lake Shelby. So, hopefully this move to the Waterway Village will help that. [1:40:12] Great weather's forecast. And again, this is supposed to be a family-friendly [1:40:15] 3-day celebration uh that brings the Gulf City of Gulf Shores and the region [1:40:20] together for a weekend of music, food, and pride. One of our partners is the [1:40:23] Seagalass Initiative. They'll be operating a bicycle ballet. Uh and all [1:40:27] proceeds that we raise from beverage sales and what will also be helping [1:40:30] assist the homelessness uh problem that the Seaglass Initiative serves to feed. [1:40:34] Uh we are grateful for that partnership and we hope we'll have great weather and [1:40:38] if you possibly can make it out during one of the three days Friday, Saturday [1:40:41] or Sunday and support this event because it is all about our locals. Thank you. [1:40:46] » Thank you. If there's no one else have anything on [1:40:51] their mind, I will ask for a motion to adjurnn. Move to [1:40:54] » adjourn. Second we here next Monday we vote on [1:41:00] these things.