[0:02] Good evening. We're going to uh call our [0:04] city council special meeting to order [0:06] for August uh 25th, 2026. And right now [0:10] the time is 5:30 p.m. [0:12] Uh we want to welcome everyone here in [0:14] the audience and and at home. Our first [0:18] business order of business is roll call. [0:22] » Councilmember Hogan? [0:23] » Here. [0:24] » Councilmember Lilburn? She has an [0:26] excused absence due to a conflict of [0:28] interest requiring recusal from the sole [0:31] item on tonight's agenda. [0:33] Councilmember McMillan? [0:34] » Here. [0:35] » Councilmember Saldana? [0:36] » Here. [0:37] » And Councilmember Timber? [0:38] » Present. [0:40] » All right. At this time, we are going to [0:43] move on to public comment and I'm going [0:45] to look to uh our city clerk to read us [0:47] into public comment. [0:49] » Thank you, Mayor Pro Tem. At this time, [0:51] we will open the public comment period. [0:52] Members of the public may address the [0:54] city council matters that are within the [0:55] city's jurisdiction and they're only [0:58] listed on the agenda. I don't see any [1:01] public speakers um remotely or in [1:04] person. [1:05] » Okay. [1:06] » And no emailed public comments either [1:08] submitted by email. [1:09] » Excellent. Thank you. Okay, we're going [1:11] to move on to the uh legislative item on [1:13] the agenda, actions related to the [1:15] Highland Senior Center HVAC systems. And [1:17] I'm going to look to Octavio for a [1:19] presentation. [1:21] » Good evening, Mayor Pro Tem, city [1:23] council. Uh tonight we'd like to provide [1:25] an update on the Highland Senior Center [1:26] HVAC project and uh seek direction from [1:29] the council regarding completion of the [1:31] project using uh CDBG and additional [1:34] city funds. [1:35] Um as a reminder, uh city's awarded uh [1:38] about $180,000 in CDBG funding through [1:42] the county in 2024 and this is part of [1:45] um COVID relief funds and um the um [1:51] the purpose of that grant, the county [1:53] suggested [1:54] um the Highland Senior Center as a [1:56] viable candidate for for those funds. Uh [2:00] So, the project was intended to address [2:02] the Highland Senior Center's three [2:04] existing [2:05] HVAC systems, aging system. [2:08] This project was seen as critical given [2:11] it serves our senior community and it's [2:13] also one of two cooling centers in the [2:16] region. [2:17] Or if you know, that's open to our [2:19] Highland [2:20] residents. [2:22] This project facilitated by the city [2:25] and the grant requires that all work be [2:27] completed by September 30th [2:30] in order to [2:32] you know, get costs reimbursed. [2:35] Since the approval, [2:37] the project's encountered um [2:40] challenge after challenge, [2:42] unforeseen circumstances. [2:44] When we first started the project, it [2:46] was intended to be a [2:48] really a like-for-like replacement. [2:51] We took a look at the existing [2:53] equipment, worked with the [2:56] the vendor, the manufacturer of that [2:58] equipment and we asked for proposal to [3:01] really replace those units in kind. At [3:04] the time, [3:05] we received a proposal to replace all [3:08] three systems for about $120,000. [3:12] Concurrently, [3:14] because this this was on a [3:16] the building is owned by the state, we [3:18] needed approval from the state to move [3:20] forward with the project. You know, fast [3:22] forward after you know, a couple years [3:24] of coordination, [3:26] we were finally given direction to [3:29] provide engineered plans and receive [3:32] approval from the state fire marshal. Um [3:35] This happened roughly this past spring. [3:39] Because time was of the essence, so even [3:41] though I said the [3:43] the grant expires or the deadline for [3:45] the grant was September is September [3:47] 30th, [3:48] at one point in time it was June 30th [3:51] and we were able to get an extension to [3:52] keep the project alive, keep it going [3:54] given the circumstance. [3:56] Um so that's one important important [3:57] piece there as far as timing's [3:59] concerned. [4:00] Uh so because time was of the essence, [4:02] uh we engaged one of our on-call [4:04] engineering firms, WSP, who's [4:07] uh well-versed in this type of work, has [4:09] worked with the state getting approvals [4:11] from the State Fire Marshal office. [4:13] And um [4:15] uh we received we we completed those [4:18] those plans and we received approval [4:19] from the state. Uh but that effort alone [4:21] was uh roughly $43,000. [4:24] Um and um [4:27] once we had those plans in place, we [4:29] reached out to a carrier who had [4:30] provided the proposal prior. And uh we [4:33] determined that [4:35] uh the the cost had significantly [4:37] increased due to additional items that [4:40] the state required to be [4:42] uh done for the project. So it was no [4:44] longer a like-for-like uh you know, in [4:47] kind replacement. We had to do a bunch [4:48] of duct work and um [4:51] uh other uh construction-related items [4:53] to to meet the the state requirement. Um [4:57] uh but all hope was not lost. Um we [4:59] pivoted rather than focusing on three [5:01] systems like we initially planned. [5:04] Uh we were able to still um [5:06] you know, deliver a project and and [5:08] deliver two systems, uh or so we [5:11] thought. [5:12] Um [5:14] Once we reached out to uh Carrier uh [5:17] to move forward with with a new proposal [5:19] that had given us um [5:21] uh for the two systems, [5:23] uh [5:24] they let us know uh that equipment was [5:26] no longer available and it would take uh [5:29] about 12 weeks to actually get that [5:31] equipment. Uh that wouldn't work with [5:33] the timeline of the grant, so we had to [5:35] pivot once more. [5:37] Um [5:38] we engaged our engineer and um other [5:41] uh vendors to try to find an alternate [5:43] substitute for for these systems or for [5:46] the HVAC system. [5:47] We were able to uh [5:49] find that train [5:51] um would be able to provide alternate [5:54] units and they were, you know, [5:57] ready, [5:58] um available, and they could deliver it [6:01] within the grant timeline. [6:02] Um the the issue was um [6:06] they couldn't secure the [6:09] piece of equipment without a signed [6:11] purchase order. Given the experience [6:13] that we had had with Carrier, [6:15] uh we moved forward with signing a [6:17] purchase order for just one system [6:20] um because there was an unknown of of [6:22] labor. Uh they were concurrently [6:25] reviewing the scope [6:27] uh make sure that they uh [6:29] uh gave us a an accurate labor cost for [6:32] the installation of that unit and we [6:33] also um asked for quotes for for the [6:36] rest of the the systems. [6:39] Uh unfortunately, the cost of all three [6:41] systems, um much like before, was beyond [6:44] the budget um and uh we focused on a [6:47] single system. [6:48] Um [6:50] and um [6:51] you know, uh to our surprise, the the [6:54] cost of that single system had increased [6:57] significantly compared to the cost that [6:59] we had seen before. [7:00] Uh for that single system, just the [7:02] labor uh was $156,000. [7:06] So, combined with the equipment that we [7:08] had reserved, [7:09] uh we were looking at $191,000 [7:12] for one of three systems. [7:15] Um [7:16] so, uh the the total project cost, [7:19] including engineering, permits, [7:23] um and a you know, we're [7:27] um [7:28] we're requesting a 20 uh roughly a 10% [7:31] contingency, so $20,000, [7:33] uh you're looking um uh [7:37] a deficit of roughly $81,000 [7:41] um uh, to to able to complete a single [7:44] system. [7:45] Um, and and that's that's really where [7:48] we are right now. Um, [7:50] to date we've spent, uh, $55,000 on on [7:54] this project and [7:56] uh, one important consideration is that [7:58] uh, so not only do we have the grant [8:00] deadline, uh, but one piece that's, uh, [8:02] required is that we deliver the project [8:04] to be able to, [8:06] uh, get the, uh, the money that we've [8:08] already spent reimbursed. [8:10] Um, [8:12] when you take out the $20,000 [8:14] contingency, uh, the cost of moving [8:17] forward with the project is $61,000. [8:22] Um, and um, [8:24] you know, with that, I you know, I'd [8:26] like to conclude my presentation and [8:27] open it up to any questions you might [8:29] have. [8:32] » I I [8:33] uh, Mr. Chair, [8:34] I'm confused. [8:36] Uh, [8:38] I was reading the list of, uh, of, uh, [8:41] materials and it looks like there's a [8:43] air conditioning unit and a heat pump. [8:46] Are they two separate units or one [8:49] together? [8:50] » So, um, I'll I'll I'll provide, uh, [8:53] a response, but I also have Jim [8:55] Richardson here who's, uh, I call him an [8:57] HVAC expert and can better explain it. [9:00] Uh, but how it works, it's it's a [9:02] system. So, I think I probably used unit [9:05] and system interchangeably. So, you have [9:08] three systems and you have a combination [9:12] of [9:13] um, two to four units per system. It's [9:17] kind of depends on the build. Uh, so, [9:20] uh, in this particular case, we would [9:22] be, uh, if if the council chooses to [9:24] move forward, we would be completing uh, [9:27] one of the three systems. I I believe it [9:30] was, you know, three units, both heating [9:32] and ventilating and, uh, air [9:33] conditioning. [9:34] » So, [9:35] so we're in essence we're replacing unit [9:38] with a heat pump, [9:40] which does air conditioning and heating [9:42] at the same time. [9:43] » Yeah, I'll I'll call Jim who can better [9:45] explain it. [9:52] » You got to turn the mic on. [9:57] » So, uh the unit that's being replaced [10:00] that is uh still in this uh [10:04] request is a Trane. [10:07] The outdoor unit is a Trane [10:09] uh condenser and the indoor part is make [10:13] made up of two [10:15] uh [10:16] fan coil units that are sistered [10:18] together [10:19] into one uh plenum [10:22] and it's because of the space that's in [10:24] the building is limited. So, it actually [10:26] takes two units inside to two five-ton [10:30] units inside [10:32] uh fan coil units [10:34] that are coupled with the outdoor 10-ton [10:37] unit. [10:39] If that makes sense. [10:42] » Well, I [10:43] I don't understand, but but uh I know uh [10:47] at AQMD, we're trying to get everyone to [10:49] use heat pumps instead of H you know, [10:52] air conditioning systems. [10:55] But, [10:56] » I can confirm that it is uh it's all [10:58] electric heat pump. It's We The existing [11:01] unit is gas electric and the new unit is [11:05] all electric. [11:06] » Okay. Okay. [11:07] Thank you. [11:08] Question uh for [11:11] Tish, I guess. The uh 81,000 [11:14] is it that's coming from our general [11:16] fund? [11:20] » Yeah, it would come from the general [11:22] fund because we can't use special [11:23] revenue funds to fund a project like [11:25] this. You can only use general fund. So, [11:28] we'll be using our general capital [11:29] financing fund [11:31] technically. [11:33] If you choose to do so. [11:34] » Being reimbursed by community [11:36] development. [11:36] » We're only being reimbursed for 178,000 [11:40] and some change, and the rest is what we [11:42] have to actually pay out of pocket as [11:44] is. [11:44] » And we're paying for a project that's [11:45] not in the city? [11:46] » Correct. [11:48] But it directly benefits our residents [11:50] is why we're allowed to actually even [11:51] consider it. Yeah. [11:54] Only from the general fund money. We [11:56] can't use any of our special revenue [11:57] accounts to fund it. [12:00] » Um I have a question for Octavio and and [12:02] I guess Jim. [12:03] Um so you you mentioned that we were [12:05] initially we were going to install three [12:06] systems, and then because of time and [12:10] the permitting process and that, you [12:11] know, [12:12] uh those constraints that we narrowed it [12:14] down to one system. [12:16] Will that one system be sufficient to [12:18] cool off the building to to be Is it [12:20] adequate enough to call it a cooling [12:22] center for our seniors? [12:26] » Yeah, so so the [12:28] the system serve different portions of [12:32] uh the center. [12:33] Um [12:35] I mean officially, I don't I don't know [12:37] what um the requirements for a cooling [12:40] center would be, but [12:43] um [12:44] you know, [12:45] moving forward with with this would [12:47] provide the the adequate cooling um [12:50] within portions of of the senior center [12:52] and [12:52] » And you know, it is assuming the the [12:54] main the general areas like where they [12:56] congregate and do some most of the [12:58] activities. [12:59] » Yes, so so the [13:02] the systems are [13:04] functioning now, so it's serving as a [13:07] cooling center as is. However, there's a [13:09] lot of maintenance uh issues and uh the [13:12] system tends to be down pretty [13:14] frequently, so uh moving forward uh with [13:17] this uh may address this at least, you [13:19] know, one of the three aging systems. [13:21] » Okay. [13:23] Okay, any [13:25] Larry? [13:26] » Uh [13:27] Well, I would [13:28] I would definitely support and move the [13:31] the project forward. However, since [13:33] we're using general fund money, [13:36] uh [13:37] I would like to ask the city manager as [13:40] part of this motion to seek [13:43] reimbursement from the state or and [13:45] county to replace the general fund money [13:47] since we are in essence donating to the [13:50] senior center. [13:53] » And if I may respond to that, um so we [13:56] will certainly try to do that. Um but [13:58] just to be clear, you know, we don't [14:00] have the time to get that approved ahead [14:02] of time because we have September Yeah, [14:04] so we will definitely [14:06] um both approach um [14:09] you know, the state and also the county [14:12] uh for effectively a reimbursement to [14:14] the city for the local funds we're going [14:16] to spend. [14:17] » Especially the state since they're the [14:18] ones that causing this additional funds [14:21] to be needed. [14:22] » Surely. [14:22] » Right. [14:23] » Yes. [14:24] » Okay, so I've got a motion. [14:27] » I second. [14:29] » And I second. I got a motion from [14:30] McAllen and a second from Hogan. [14:33] Uh all those in favor? [14:35] » Aye. [14:35] » Aye. [14:37] » Any opposed? [14:38] » Just to follow up on I just want to make [14:41] sure it's a reflect in the minutes what [14:43] Larry just discussed. I have heartburn [14:45] spending general fund money outside the [14:48] city even though it does probably [14:51] service a lot of Island citizens in a [14:54] state building which required us to put [14:57] increased costs into this project in [15:00] their building. [15:02] Government is running absolutely amok. [15:05] I mean [15:07] » I I agree with you, John. I [15:09] if I may share while I was out [15:11] canvassing for my campaign and speaking [15:13] to some of these seniors, [15:14] a lot of them that are on fixed budgets [15:16] don't want to run the AC system, you [15:18] know, they they can't afford to it and [15:21] it being 109° outside today, I can only [15:24] imagine what you know how they're [15:25] suffering. So, us being able to provide [15:28] this, even if it is a state building, us [15:30] being able to provide this for them, I [15:31] think, you know, it's a step in the [15:33] » Well, I understand I approve the [15:34] project, but there's just heartburn that [15:37] the state's requiring us to do extra [15:39] things to get this project through in [15:42] their building to service citizens of [15:45] the county, Highland, and the state of [15:48] California. Makes absolutely no sense. [15:50] But, [15:51] » Hopefully Carlos can get us that money [15:53] reimbursed, but okay. [15:55] » And and then just to be clear, as part [15:56] of the recommendation by city council, [15:59] we do have an eighth item, and that is [16:01] for the city manager to seek [16:03] reimbursement from the state and/or the [16:04] county for the city's share. So, just [16:07] want to put that into the record. [16:08] » Into the record, yes. [16:09] » Yes, thank you. [16:10] » Okay. Does that require a separate vote? [16:12] That's just [16:14] » No, that was It's all part of the same [16:15] vote that the council [16:17] » Okay. Um if we don't have any other [16:19] items, uh we will adjourn. [16:21] » Now, can I ask a question? This is not [16:24] on the agenda. It's it's off the agenda, [16:26] but it's we're not going to ask or make [16:28] a decision. I'd like an update [16:31] on the stolen cameras. [16:34] Uh makes no sense that [16:37] How are they stealing on a pole that's [16:39] 30 or 40 ft in the air unless you've got [16:41] a boom truck? And can we get an update [16:44] where that's at and what do we have what [16:47] information we have about the theft? It [16:49] just to me is what mind-boggling. [16:51] » Yeah, so I'll I'll I'll be brief because [16:53] it's not an item on the agenda, but just [16:55] as part of my updates that I would give [16:57] to the council, I suppose I can take a [16:59] few minutes to cover that item. Um what [17:02] I can tell you is that we did have [17:03] vandalism at three separate locations. I [17:06] could tell you that Captain Dean is [17:09] making this a priority for him. They are [17:11] going to [17:12] catch the people. They No, they they [17:15] They there's there's vandalism. They're [17:16] cutting the poles. They're damaging the [17:18] equipment. [17:19] » The poles most of them are on traffic [17:21] signal poles. [17:22] » Actually [17:23] there are some that are not. There are [17:25] on poles. In fact, the one that [17:27] just to give you a point of reference, [17:29] there's one right there in front of the [17:30] Starbucks on Baseline at the 210 Freeway [17:33] and it's in the median and you can see [17:35] it. It's it's visible. It's about the [17:38] height of [17:39] you know a street street sign like a [17:41] street name sign or or a stop sign. So [17:43] it's a pole of that height. So not all [17:47] cameras are set up higher in elevation, [17:50] but that is something that we're looking [17:52] to do in order to [17:53] » So they're basically being stolen low [17:55] elevated. [17:57] » Correct. Cameras that are accessible. [17:59] Obviously people shouldn't be doing [18:00] that, but the fact of the matter is [18:03] they're there. [18:04] They are accessible. All they have to do [18:06] is cut the pole and they're the camera [18:09] will come down with the panel with solar [18:11] panel and everything. So this is an [18:13] issue. [18:15] And so we we are working with Flock to [18:17] get those cameras replaced, but we're [18:20] also working the PD is also working [18:22] » Pole I hope. [18:23] » Right. We're looking at those yeah, so [18:25] that we don't necessarily [18:27] put them right back where it was because [18:29] obviously we need to take a different [18:31] approach. [18:31] » I don't think we should continue talking [18:34] about where the cameras are and how high [18:35] they are. [18:36] » Yeah. [18:37] » And and um since this item is not on the [18:39] agenda, I I would recommend that we wrap [18:41] up the discussion as well. [18:43] » Thank you, Marcella. Okay, with that we [18:45] will adjourn. [18:47] » Thanks for patience. [18:53] » I was just envisioning how they climb